Sample records for specific monitoring plan

  1. Hydrologic data and description of a hydrologic monitoring plan for the Borax Lake area, Oregon

    USGS Publications Warehouse

    Schneider, Tiffany Rae; McFarland, William D.

    1995-01-01

    Information from field visits was used to develop a monitoring plan. The plan would include monitoring Borax Lake by measuring discharge, stage, evaporation, temperature, and specific conductance; water-quality sampling and analysis; and monitoring shallow ground-water levels near Borax Lake using shallow piezometers. Minimally, one hot spring in North Borax Lake Spring Group 1 would be monitored for temperature and specific conductance and sampled for water-quality analysis. In addition, two flowing wells would be monitored for water levels, temperature, specific conductance, and discharge and sampled for water-quality analysis. The construction characteristics of these wells must be verified before long-term data collection begins. In the future, it may be helpful to monitor shallow and (or) deep observation wells drilled into the thermal aquifer to understand the possible effects of geothermal development on Borax Lake and nearby springs.

  2. 40 CFR 63.11468 - What are the monitoring requirements for new and existing sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... baghouse, including but not limited to air leaks, torn or broken bags or filter media, or any other... identified in the site-specific monitoring plan required by paragraph (c)(2) of this section. (vii) You must... submit to the Administrator or delegated authority for approval a site-specific monitoring plan for each...

  3. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  4. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  5. The strategy and design of the effectiveness monitoring program for the Northwest Forest Plan.

    Treesearch

    Barry S. Mulder; Barry R. Noon; Thomas A. Spies; Martin G. Raphael; Craig J. Palmer; Anthony R. Olsen; Gordon H. Reeves; Hartwell H. Welsh

    1999-01-01

    This report describes the logic and design of an effectiveness monitoring program for the Northwest Forest Plan. The program is prospective, providing an early warning of environmental change before irreversible loss has occurred. Monitoring is focused at two resource levels: individual species and specific ecosystem types. Selection of prospective indicators for the...

  6. Development of Computerized Monitoring of Education Plans.

    ERIC Educational Resources Information Center

    Greene, J. Weldon; And Others

    The District of Columbia Public Schools initiated a multiyear planning process in 1983. Among other activities, the process calls for the computerized monitoring of the critical tasks of each of the district's major offices. These tasks, defined by the offices, are designed to facilitate the achievement of specific objectives designated in the…

  7. Prospective treatment plan-specific action limits for real-time intrafractional monitoring in surface image guided radiosurgery.

    PubMed

    Yock, Adam D; Pawlicki, Todd; Kim, Gwe-Ya

    2016-07-01

    In surface image guided radiosurgery, action limits are created to determine at what point intrafractional motion exhibited by the patient is large enough to warrant intervention. Action limit values remain constant across patients despite the fact that patient motion affects the target coverage of brain metastases differently depending on the planning technique and other treatment plan-specific factors. The purpose of this work was twofold. The first purpose was to characterize the sensitivity of single-met per iso and multimet per iso treatment plans to uncorrected patient motion. The second purpose was to describe a method to prospectively determine treatment plan-specific action limits considering this sensitivity. In their surface image guided radiosurgery technique, patient positioning is achieved with a thermoplastic mask that does not cover the patient's face. The patient's exposed face is imaged by a stereoscopic photogrammetry system. It is then compared to a reference surface and monitored throughout treatment. Seventy-two brain metastases (representing 29 patients) were used for this study. Twenty-five mets were treated individually ("single-met per iso plans"), and 47 were treated in a plan simultaneously with at least one other met ("multimet per iso plans"). For each met, the proportion of the gross tumor volume that remained within the 100% prescription isodose line was estimated under the influence of combinations of translations and rotations (0.0-3.0 mm and 0.0°-3.0°, respectively). The target volume and the prescription dose-volume were considered concentric spheres that each encompassed a volume determined from the treatment plan. Plan-specific contour plots and DVHs were created to illustrate the sensitivity of a specific lesion to uncorrected patient motion. Both single-met per iso and multimet per iso plans exhibited compromised target coverage under translations and rotations, though multimet per iso plans were considerably more sensitive to these transformations (2.3% and 39.8%, respectively). Plan-specific contour plots and DVHs were used to illustrate how size, distance from isocenter, and planning technique affect a particular met's sensitivity to motion. Stereotactic radiosurgery treatment plans that treat multiple brain metastases using a common isocenter are particularly susceptible to compromised target coverage as a result of uncorrected patient motion. The use of such a planning technique along with other treatment plan-specific factors should influence patient motion management. A graphical representation of the effect of translations and rotations on any particular plan can be generated to inform clinicians of the appropriate action limit when monitoring intrafractional motion.

  8. Evaluation of HACCP Plans of Food Industries: Case Study Conducted by the Servizio di Igiene degli Alimenti e della Nutrizione (Food and Nutrition Health Service) of the Local Health Authority of Foggia, Italy

    PubMed Central

    Panunzio, Michele F.; Antoniciello, Antonietta; Pisano, Alessandra; Rosa, Giovanna

    2007-01-01

    With respect to food safety, many works have studied the effectiveness of self-monitoring plans of food companies, designed using the Hazard Analysis and Critical Control Point (HACCP) method. On the other hand, in-depth research has not been made concerning the adherence of the plans to HACCP standards. During our research, we evaluated 116 self-monitoring plans adopted by food companies located in the territory of the Local Health Authority (LHA) of Foggia, Italy. The general errors (terminology, philosophy and redundancy) and the specific errors (transversal plan, critical limits, hazard specificity, and lack of procedures) were standardized. Concerning the general errors, terminological errors pertain to half the plans examined, 47% include superfluous elements and 60% have repetitive subjects. With regards to the specific errors, 77% of the plans examined contained specific errors. The evaluation has pointed out the lack of comprehension of the HACCP system by the food companies and has allowed the Servizio di Igiene degli Alimenti e della Nutrizione (Food and Nutrition Health Service), in its capacity as a control body, to intervene with the companies in order to improve designing HACCP plans. PMID:17911662

  9. Quality of life of coronary artery disease patients after the implementation of planning strategies for medication adherence 1

    PubMed Central

    Lourenço, Laura Bacelar de Araujo; Rodrigues, Roberta Cunha Matheus; São-João, Thaís Moreira; Gallani, Maria Cecilia; Cornélio, Marilia Estevam

    2015-01-01

    OBJECTIVE: to compare the general and specific health-related quality of life (HRQoL) between the Intervention (IG) and Control (CG) groups of coronary artery disease patients after the implementation of Action Planning and Coping Planning strategies for medication adherence and to verify the relationship between adherence and HRQoL. METHOD: this was a controlled and randomized study. RESULTS: the sample (n=115) was randomized into two groups, IG (n=59) and CG (n=56). Measures of medication adherence and general and specific HRQoL were obtained in the baseline and after two months of monitoring. CONCLUSION: the findings showed that the combination of intervention strategies - Action Planning and Coping Planning for medication adherence did not affect the HRQoL of coronary artery disease patients in outpatient monitoring. PMID:25806626

  10. 75 FR 75059 - Mandatory Reporting of Greenhouse Gases: Injection and Geologic Sequestration of Carbon Dioxide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... monitoring will achieve detection and quantification of CO 2 in the event surface leakage occurs. The UIC... leakage detection monitoring system or technical specifications should also be described in the MRV plan... of injected CO 2 or from another cause (e.g. natural variability). The MRV plan leakage detection and...

  11. 40 CFR 63.8810 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... data. Monitoring failures that are caused by poor maintenance or careless operation are not... performance evaluation of each CMS in accordance with your site-specific monitoring plan. (4) You must operate...

  12. 40 CFR 63.10020 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-of-control periods, or required monitoring system quality assurance or control activities in... monitoring system quality assurance or quality control activities including, as applicable, calibration... collect data according to this section and the site-specific monitoring plan required by § 63.10000(d). (b...

  13. 40 CFR 63.10020 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-of-control periods, or required monitoring system quality assurance or control activities in... monitoring system quality assurance or quality control activities including, as applicable, calibration... collect data according to this section and the site-specific monitoring plan required by § 63.10000(d). (b...

  14. 40 CFR 63.10020 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-of-control periods, or required monitoring system quality assurance or control activities in... monitoring system quality assurance or quality control activities including, as applicable, calibration... collect data according to this section and the site-specific monitoring plan required by § 63.10000(d). (b...

  15. 40 CFR 63.7535 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activities, including, as applicable, calibration checks and required zero and span adjustments. A monitoring...-control periods, or required monitoring system quality assurance or control activities in data averages... data according to this section and the site-specific monitoring plan required by § 63.7505(d). (b) You...

  16. 40 CFR 63.7535 - How do I monitor and collect data to demonstrate continuous compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activities, including, as applicable, calibration checks and required zero and span adjustments. A monitoring...-control periods, or required monitoring system quality assurance or control activities in data averages... data according to this section and the site-specific monitoring plan required by § 63.7505(d). (b) You...

  17. Phase 2 Site-Specific Fumigant Management Plans and Post-Application Summaries

    EPA Pesticide Factsheets

    New soil fumigant pesticide requirements protect handlers and other workers from exposure risks. FMP elements include application block information, tarp plan, buffer zone and sign posting requirements, air monitoring, and hazard communication.

  18. 40 CFR 98.448 - Geologic sequestration monitoring, reporting, and verification (MRV) plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Sequestration of Carbon Dioxide § 98.448 Geologic sequestration monitoring, reporting, and verification (MRV... use to calculate site-specific variables for the mass balance equation. This includes, but is not...

  19. 40 CFR 98.448 - Geologic sequestration monitoring, reporting, and verification (MRV) plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Sequestration of Carbon Dioxide § 98.448 Geologic sequestration monitoring, reporting, and verification (MRV... use to calculate site-specific variables for the mass balance equation. This includes, but is not...

  20. 40 CFR 63.2994 - How do I verify the performance of monitoring equipment?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... monitoring equipment. (2) Conduct a performance evaluation of the continuous monitoring system (CMS...-specific performance evaluation plan, conduct of the performance evaluation, and reporting of performance... 40 Protection of Environment 12 2010-07-01 2010-07-01 true How do I verify the performance of...

  1. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  2. Evaluation and prioritization of stream habitat monitoring in the Lower Columbia Salmon and Steelhead Recovery Domain as related to the habitat monitoring needs of ESA recovery plans

    USGS Publications Warehouse

    Puls, Amy L.; Anlauf Dunn, Kara; Graham Hudson, Bernadette

    2014-01-01

    The lower Columbia River and its tributaries once supported abundant runs of salmon and steelhead; however, there are five species currently listed under the federal Endangered Species Act (ESA). The National Marine Fisheries Service has completed, and is proposing for adoption, a comprehensive ESA Recovery Plan for the Lower Columbia Evolutionarily Significant Units (ESUs) based on the recovery plans developed by Oregon and Washington. One of the primary factors attributed to the decline of these species is habitat degradation. There are numerous entities conducting status and/or trends monitoring of instream habitat in the lower Columbia River Basin, but because the programs were developed for agency specific reasons, the existing monitoring efforts are not well coordinated, and often lack the spatial coverage, certainty, or species coverage necessary to answer questions related to status and trends of the ESA listed populations. The Pacific Northwest Aquatic Monitoring Partnership’s Integrated Status and Trends Monitoring (ISTM) project was initiated to improve integration of existing and new monitoring efforts by developing recommendations for sampling frames, protocols, and data sharing. In an effort to meet the ISTM project goals, five objectives were identified: (1) identify and prioritize decisions, questions, and monitoring objectives, (2) evaluate how existing programs align with these management decisions, questions, and objectives, (3) identify the most appropriate monitoring design to inform priority management decisions, questions, and objectives, (4) use trade-off analysis to develop specific recommendations for monitoring based on outcomes of Objectives 1-3 and (5) recommend implementation and reporting mechanisms. This report summarizes the effort to address Objectives 1 and 2, detailing the commonalities among the habitat characteristics that all entities measure and monitor, and how the metrics align with the priorities listed in the comprehensive recovery plan for the Lower Columbia ESUs.

  3. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

    NASA Technical Reports Server (NTRS)

    Wilson, Deborah M.; Miller, Ralinda R.

    2015-01-01

    The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

  4. Ocean climate indicators: A monitoring inventory and plan for tracking climate change in the north-central California coast and ocean region

    USGS Publications Warehouse

    Duncan, Benet; Higgason, Kelley; Suchanek, Tom; Largier, John; Stachowicz, Jay; Allen, Sarah; Bograd, Steven; Breen, R.; Gellerman, Holly; Hill, Tessa; Jahncke, Jaime; Johnson, Rebecca L.; Lonhart, Steve I.; Morgan, Steven; Wilkerson, Frances; Roletto, Jan

    2013-01-01

    The impacts of climate change, defined as increasing atmospheric and oceanic carbon dioxide and associated increases in average global temperature and oceanic acidity, have been observed both globally and on regional scales, such as in the North-central California coast and ocean, a region that extends from Point Arena to Point Año Nuevo and includes the Pacific coastline of the San Francisco Bay Area. Because of the high economic and ecological value of the region’s marine environment, the Gulf of the Farallones National Marine Sanctuary (GFNMS) and other agencies and organizations have recognized the need to evaluate and plan for climate change impacts. Climate change indicators can be developed on global, regional, and site-specific spatial scales, and they provide information about the presence and potential impacts of climate change. While indicators exist for the nation and for the state of California as a whole, no system of ocean climate indicators exist that specifically consider the unique characteristics of the California coast and ocean region. To that end, GFNMS collaborated with over 50 regional, federal, and state natural resource managers, research scientists, and other partners to develop a set of 2 ocean climate indicators specific to this region. A smaller working group of 13 regional partners developed monitoring goals, objectives, strategies, and activities for the indicators and recommended selected species for biological indicators, resulting in the Ocean Climate Indicators Monitoring Inventory and Plan. The working group considered current knowledge of ongoing monitoring, feasibility of monitoring, costs, and logistics in selecting monitoring activities and selected species.

  5. Monitoring game-based motor rehabilitation of patients at home for better plans of care and quality of life.

    PubMed

    Ponte, S; Gabrielli, S; Jonsdottir, J; Morando, M; Dellepiane, S

    2015-01-01

    This paper describes the biomedical, remote monitoring infrastructure developed and currently tested in the EU REHAB@HOME project to support home rehabilitation of the upper extremity of persons post-stroke and in persons with other neurological disorders, such as Multiple Sclerosis patients, in order to track their progress over therapy and improve their Quality of Life. The paper will specifically focus on describing the initial testing of the tele-rehabilitation system's components for patients' biomedical monitoring over therapy, which support the delivery and monitoring of more personalized, engaging plans of care by rehabilitation centers and services.

  6. Hydrologic data and description of a hydrologic monitoring plan for Medicine Lake Volcano, California

    USGS Publications Warehouse

    Schneider, Tiffany Rae; McFarland, W.D.

    1996-01-01

    A hydrologic reconnaissance of the Medicine Lake Volcano area was done to collect data needed for the design of a hydrologic monitoring plan. The reconnaissance was completed during two field trips made in June and September 1992, during which geothermal and hydrologic features of public interest in the Medicine Lake area were identified. Selected wells, springs, and geothermal features were located and documented, and initial water-level, discharge, temperature, and specific-conductance measurements were made. Lakes in the study area also were surveyed during the September field trip. Temperature, specific- conductance, dissolved oxygen, and pH data were collected by using a multiparameter probe. The proposed monitoring plan includes measurement of water levels in wells, discharge from springs, and lake stage, as well as analysis of well-,spring-, and lake-water quality. In determining lake-water quality, data for both stratified and unstratified conditions would be considered. (Data for stratified conditions were collected during the reconnaissance phase of this project, but data for unstratified conditions were not.) In addition, lake stage also would be monitored. A geothermal feature near Medicine Lake is a "hot spot" from which hot gases discharge from two distinct vents. Gas chemistry and temperature would be monitored in one of these vents.

  7. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  8. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1994-10-13

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  9. Overview of Emerging Air Quality Monitoring Technologies and Their Data

    EPA Science Inventory

    This is a webinar presentation as part of a series on Air Quality Planning for Wildland Smoke. The purpose of the talk is to provide a basic overview of monitoring technologies and specifically focus on emerging technologies for PM2.5.

  10. 40 CFR 60.4880 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section are met. (A) The zero (low-level), mid-level (if applicable), or high-level calibration drift... representative of the relative or absolute particulate matter loadings for each exhaust stack, roof vent, or...

  11. 40 CFR 60.4880 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section are met. (A) The zero (low-level), mid-level (if applicable), or high-level calibration drift... representative of the relative or absolute particulate matter loadings for each exhaust stack, roof vent, or...

  12. 40 CFR 60.4880 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section are met. (A) The zero (low-level), mid-level (if applicable), or high-level calibration drift... representative of the relative or absolute particulate matter loadings for each exhaust stack, roof vent, or...

  13. U.S. Marine Corps S&T Strategic Plan: Leading Edge Technology for the Marines of Tomorrow

    DTIC Science & Technology

    2009-07-29

    in monitoring exercise intensity, frequency, duration, recovery, and/or specific physiological indicators of aerobic training to prevent over-or...plan that focus specifically on Escalation of Force and Irregular Wa, fa",. III aoJditiuII, we have muvcd Training & Education from an Annex into...vision by developing Marine Corps warfighting concepts and determines required capabilities through Doctrine, Organization, Training , Materiel

  14. A patient self-assessment tool for cardiac rehabilitation.

    PubMed

    Phelan, C; Finnell, M D; Mottla, K A

    1989-01-01

    A patient self-assessment tool was designed, tested, and implemented to promote cardiac-specific data collection, based on Gordon's Functional Health Patterns, to maximize patient/family involvement in determining a plan of care, and to streamline primary nurses' documentation requirements. Retrospective and concurrent chart reviews provided data for quality assurance monitoring. The results of the monitoring demonstrated that the self-assessment tool markedly improved the patient-specific data base.

  15. INVESTIGATING THE EFFICACY OF CLINICAL TRIAL MONITORING STRATEGIES: Design and Implementation of the Cluster Randomized START Monitoring Substudy

    PubMed Central

    Hullsiek, Katherine Huppler; Kagan, Jonathan M; Engen, Nicole; Grarup, Jesper; Hudson, Fleur; Denning, Eileen T; Carey, Catherine; Courtney-Rodgers, David; Finley, Elizabeth B; Jansson, Per O; Pearson, Mary T; Peavy, Dwight E; Belloso, Waldo H

    2014-01-01

    Background Trial monitoring protects participant safety and study integrity. While monitors commonly go on-site to verify source data, there is little evidence that this practice is efficient or effective. An ongoing international HIV treatment trial (START) provides an opportunity to explore the usefulness of different monitoring approaches. Methods All START sites are centrally monitored and required to follow a local monitoring plan requiring specific quality assurance activities. Additionally, sites were randomized (1:1) to receive, or not receive, annual on-site monitoring. The study will determine if on-site monitoring increases the identification of major protocol deviations (eligibility or consent violations, improper study drug use, primary or serious event underreporting, data alteration or fraud). Results The START study completed enrollment in December 2013, with planned follow-up through December 2016. The monitoring study is ongoing at 196 sites in 34 countries. Results are expected when the START study concludes in December 2016. PMID:25973346

  16. Monitoring bird populations in small geographic areas

    USGS Publications Warehouse

    Dunn, Erica H.; Bart, J.; Collins, B.T.; Craig, B.; Dale, B.; Downes, C.M.; Francis, C.M.; Woodley, S.; Zorn, P.

    2006-01-01

    Numerous methods exist for monitoring bird populations, and there is a large literature describing them. There are few resources, however, that provide comprehensive advice on every step of organizing and carrying out a survey, from the early stages of planning to final use of the data. Even fewer resources are designed to meet the needs of a wide variety of potential users, from amateurs interested in change of bird life in a local study preserve to professionals testing hypotheses on the response of birds to habitat management, although much of the advice should be the same for every monitoring program. Whether survey objectives are very modest or rigorously scientific, samples must be sufficiently numerous and well distributed to provide meaningful results, and the survey should be well designed to ensure that the money and effort going into it are not wasted. This document is intended to be a complete resource for anyone planning to organize monitoring of noncolonial landbirds within a relatively small geographic area (e.g., from the size of a woodlot to a large park). The first of its two parts provides background explaining the importance of good study design and gives specific advice on all aspects of project planning and execution of high-quality data collection for the purpose of hypothesis testing. The second part is self-contained and nontechnical and describes complete plans for a site-specific checklist survey, suitable for addressing monitoring questions frequently asked by amateurs and for involvement of volunteers in data collection. Throughout are references to additional resources, from background literature to sources of existing survey protocols, analysis software, and tools for archiving data.

  17. 33 CFR 157.02 - Incorporation by reference: Where can I get a copy of the publications mentioned in this part?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...

  18. 33 CFR 157.02 - Incorporation by reference: Where can I get a copy of the publications mentioned in this part?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...

  19. 33 CFR 157.02 - Incorporation by reference: Where can I get a copy of the publications mentioned in this part?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...

  20. 33 CFR 157.02 - Incorporation by reference: Where can I get a copy of the publications mentioned in this part?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Item 11, Guidelines and Specifications for Oil Discharge Monitoring and Control Systems for Oil Tankers... Monitoring and Control Systems for Oil Tankers (“A.586(14)”), incorporation by reference approved for § 157... 1983, Guidelines for Plan Approval and Installation Survey of Oil Discharge Monitoring and Control...

  1. 40 CFR Appendix N to Part 50 - Interpretation of the National Ambient Air Quality Standards for PM2.5

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... monitors utilize the same specific sampling and analysis method. Combined site data record is the data set... monitors are suitable monitors designated by a state or local agency in their annual network plan (and in... appendix. Seasonal sampling is the practice of collecting data at a reduced frequency during a season of...

  2. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  3. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  4. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  5. 22 CFR Appendix I to Part 211 - Operational Plan

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for the selection of the geographical areas where programs will be carried out; the calculation of... extension services. Describe specific areas of collaboration relative to program purposes. (6) Monitoring...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  6. Annual Report for Gravity Collection Lysimeter Monitoring Plan- ERDF Cells 5 and 6, CY 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. L. Weiss; D. W. Woolery

    2009-08-25

    The purpose of this annual report is to evaluate the conditions and identify trends to develop Hanford site-specific data on the performance of the lysimeter systems related to the vadose zone monitoring and potential future use of lysimeter systems.

  7. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system wasmore » designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.« less

  8. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    PubMed

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system's ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.

  9. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    NASA Astrophysics Data System (ADS)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  10. SU-E-T-110: An Investigation On Monitor Unit Threshold and Effects On IMPT Delivery in Proton Pencil Beam Planning System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Syh, J; Ding, X; Syh, J

    2015-06-15

    Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization,more » specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study.« less

  11. 76 FR 6403 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    .... Program Planning A. Annual Catch Limit (ACL) Specification Process B. Workshop on ACLs for Coral Reef.... Coastal and Marine Spatial Planning 4. Ecosystem Monitoring and Community Issues A. Report on Coral Reef... Resources i. Coral Reef Fisheries ii. Bottomfish Fisheries iii. Crustacean Fisheries B. National Marine...

  12. 40 CFR 60.5200 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control if the conditions of paragraph (a)(7)(i)(A) or (a)(7)(i)(B) of this section are met. (A) The zero... representative of the relative or absolute particulate matter loadings for each exhaust stack, roof vent, or...

  13. 40 CFR 60.5200 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control if the conditions of paragraph (a)(7)(i)(A) or (a)(7)(i)(B) of this section are met. (A) The zero... representative of the relative or absolute particulate matter loadings for each exhaust stack, roof vent, or...

  14. 40 CFR 60.5200 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control if the conditions of paragraph (a)(7)(i)(A) or (a)(7)(i)(B) of this section are met. (A) The zero... representative of the relative or absolute particulate matter loadings for each exhaust stack, roof vent, or...

  15. Hydrogeologic Modeling for Monitoring, Reporting and Verification of Geologic Sequestration

    NASA Astrophysics Data System (ADS)

    Kolian, M.; De Figueiredo, M.; Lisa, B.

    2011-12-01

    In December 2010, EPA finalized Subpart RR of the Greenhouse Gas (GHG) Reporting Program, which requires facilities that conduct geologic sequestration (GS) of carbon dioxide (CO2) to report GHG data to EPA annually. The GHG Reporting Program requires reporting of GHGs and other relevant information from certain source categories in the United States, and information obtained through Subpart RR will inform Agency decisions under the Clean Air Act related to the use of carbon dioxide capture and sequestration for mitigating GHGs. This paper examines hydrogeologic modeling necessities and opportunities in the context of Subpart RR. Under Subpart RR, facilities that conduct GS by injecting CO2 for long-term containment in subsurface geologic formations are required to develop and implement an EPA-approved site-specific monitoring, reporting, and verification (MRV) plan; and report basic information on CO2 received for injection, annual monitoring activities and the amount of CO2 geologically sequestered using a mass balance approach. The major components of the MRV plan include: identification of potential surface leakage pathways for CO2 and the likelihood, magnitude, and timing, of surface leakage of CO2 through these pathways; delineation of the monitoring areas; strategy for detecting and quantifying any surface leakage of CO2; and the strategy for establishing the expected baselines for monitoring CO2 surface leakage. Hydrogeologic modeling is an integral aspect of the design of an MRV plan. In order to prepare an adequate monitoring program that addresses site specific risks over the full life of the project the MRV plan must reflect the full spatial extent of the free phase CO2 over time. Facilities delineate the maximum area that the CO2 plume is predicted to cover and how monitoring can be phased in over this area. The Maximum Monitoring Area (MMA) includes the extent of the free phase CO2 plume over the lifetime of the project plus a buffer zone of one-half mile. The Active Monitoring Area (AMA) is the area that will be monitored over a specified time interval chosen by the reporter, which must be greater than one year. All of the area in the MMA will eventually be covered by one or more AMAs. This allows operators to phase in monitoring so that during any given time interval, only that part of the MMA in which surface leakage might occur needs to be monitored. EPA designed the MRV plan approach to be site-specific, flexible, and adaptive to future technology developments. This approach allows the reporter to leverage the site characterization, modeling, and monitoring approaches (e.g. monitoring of injection pressures, injection well integrity, groundwater quality and geochemistry, and CO2 plume location, etc.) developed for their Underground Injection Control (UIC) permit. UIC requirements provide the foundation for the safe sequestration of CO2 by helping to ensure that injected fluids remain isolated in the subsurface and away from underground sources of drinking water, thereby serving to reduce the risk of CO2 leakage to the atmosphere.

  16. Comparison between In-house developed and Diamond commercial software for patient specific independent monitor unit calculation and verification with heterogeneity corrections.

    PubMed

    Kuppusamy, Vijayalakshmi; Nagarajan, Vivekanandan; Jeevanandam, Prakash; Murugan, Lavanya

    2016-02-01

    The study was aimed to compare two different monitor unit (MU) or dose verification software in volumetric modulated arc therapy (VMAT) using modified Clarkson's integration technique for 6 MV photons beams. In-house Excel Spreadsheet based monitor unit verification calculation (MUVC) program and PTW's DIAMOND secondary check software (SCS), version-6 were used as a secondary check to verify the monitor unit (MU) or dose calculated by treatment planning system (TPS). In this study 180 patients were grouped into 61 head and neck, 39 thorax and 80 pelvic sites. Verification plans are created using PTW OCTAVIUS-4D phantom and also measured using 729 detector chamber and array with isocentre as the suitable point of measurement for each field. In the analysis of 154 clinically approved VMAT plans with isocentre at a region above -350 HU, using heterogeneity corrections, In-house Spreadsheet based MUVC program and Diamond SCS showed good agreement TPS. The overall percentage average deviations for all sites were (-0.93% + 1.59%) and (1.37% + 2.72%) for In-house Excel Spreadsheet based MUVC program and Diamond SCS respectively. For 26 clinically approved VMAT plans with isocentre at a region below -350 HU showed higher variations for both In-house Spreadsheet based MUVC program and Diamond SCS. It can be concluded that for patient specific quality assurance (QA), the In-house Excel Spreadsheet based MUVC program and Diamond SCS can be used as a simple and fast accompanying to measurement based verification for plans with isocentre at a region above -350 HU. Copyright © 2016 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  17. Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mayhorn, Ebony T.; Sullivan, Greg P.; Petersen, Joseph M.

    2015-09-29

    This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.

  18. System of indexes and indicators for the quality evaluation of HACCP plans based on the results of the official controls conducted by the Servizio di Igiene degli Alimenti della Nutrizione (Food and Nutrition Health Service) of the Local Health Authority of Foggia, Italy.

    PubMed

    Panunzio, Michele F; Antoniciello, Antonietta; Pisano, Alessandra

    2007-03-01

    Within the realm of evaluating self-monitoring plans, developed based on the Hazard Analysis and Critical Control Points (HACCP) method and adopted by food companies, little research has been done concerning the quality of the plans. The Servizio di Igiene degli Alimenti e della Nutrizione (Food and Nutrition Health Service) of the Local Health Authority of Foggia, Italy, has conducted research with the aim to adopt a system of indexes and indicators for the qualitative evaluation of HACCP plans. The critical areas considered were the following: simplicity, specificity, feasibility and adherence. During the period from January 2004 to June 2005, the evaluation grid was used in examining 250 HACCP self-monitoring plans of food companies. For the analysis of the determining factor four groups were considered, with reference to HACCP self-monitoring plans designed: group 1 - with the aid of a qualified team; group 2 - with the aid of an unqualified team; group 3 - with the aid of an unqualified expert; group 4 - without the aid of an expert. The mean values of the measures elaborated decrease towards insufficiency moving from group 1 to group 4. In particular, collaboration by teams of unqualified experts brought about drafting unacceptable HACCP plans on the levels of specificity and adherence, with respect to the HACCP method. The method proposed of the analysis of the indexes and indicators beginning with an evaluation sheet can also help the individual company to better adjust contribution by internal or external professionals to the company.

  19. 40 CFR 62.15215 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initial evaluation of your continuous opacity monitoring system according to Performance Specification 1 in appendix B of 40 CFR part 60. Complete this evaluation by 180 days after your final compliance... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS...

  20. Autonomous Mission Operations Roadmap

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy David

    2014-01-01

    As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.

  1. Revised ground-water monitoring compliance plan for the 300 area process trenches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less

  2. 40 CFR 74.61 - Monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...

  3. Area-specific recreation use estimation using the national visitor use monitoring program data.

    Treesearch

    Eric M. White; Stanley J. Zarnoch; Donald B.K. English

    2007-01-01

    Estimates of national forest recreation use are available at the national, regional, and forest levels via the USDA Forest Service National Visitor Use Monitoring (NVUM) program. In some resource planning and management applications, analysts desire recreation use estimates for subforest areas within an individual national forest or for subforest areas that combine...

  4. Monitoring in the nearshore: A process for making reasoned decisions

    USGS Publications Warehouse

    Bodkin, James L.; Dean, T.A.

    2003-01-01

    Over the past several years, a conceptual framework for the GEM nearshore monitoring program has been developed through a series of workshops. However, details of the proposed monitoring program, e.g. what to sample, where to sample, when to sample and at how many sites, have yet to be determined. In FY 03 we were funded under Project 03687 to outline a process whereby specific alternatives to monitoring are developed and presented to the EVOS Trustee Council for consideration. As part of this process, two key elements are required before reasoned decisions can be made. These are: 1) a comprehensive historical perspective of locations and types of past studies conducted in the nearshore marine communities within Gulf of Alaska, and 2) estimates of costs for each element of a proposed monitoring program. We have developed a GIS database that details available information from past studies of selected nearshore habitats and species in the Gulf of Alaska and provide a visual means of selecting sites based (in part) on the locations for which historical data of interest are available. We also provide cost estimates for specific monitoring plan alternatives and outline several alternative plans that can be accomplished within reasonable budgetary constraints. The products that we will provide are: 1) A GIS database and maps showing the location and types of information available from the nearshore in the Gulf of Alaska; 2) A list of several specific monitoring alternatives that can be conducted within reasonable budgetary constraints; and 3) Cost estimates for proposed tasks to be conducted as part of the nearshore program. Because data compilation and management will not be completed until late in FY03 we are requesting support for close-out of this project in FY 04.

  5. Proposal and work plan to calibrate and verify a water-quality model to simulate effects of wastewater discharges to the Red River of the North at drought streamflow near Fargo, North Dakota, and Moorhead, Minnesota

    USGS Publications Warehouse

    Wesolowski, Edwin A.

    2000-01-01

    This report presents a proposal for conducting a water-quality modeling study at drought streamflow, a detailed comprehensive plan for collecting the data, and an annual drought-formation monitoring plan. A 30.8 mile reach of the Red River of the North receives treated wastewater from plants at Fargo, North Dakota, and Moorhead, Minnesota, and streamflow from the Sheyenne River. The water-quality modeling study will evaluate the effects of continuous treated-wastewater discharges to the study reach at drought streamflow. The study will define hydraulic characteristics and reaeration and selected reaction coefficients and will calibrate and verity a model.The study includes collecting synoptic water-quality samples for various types of analyses at a number of sites in the study reach. Dye and gas samples will be collected for traveltime and reaeration measurements. Using the Lagrangian reference frame, synoptic water-quality samples will be collected for analysis of nutrients, chlorophyll a, alkalinity, and carbonaceous biochemical oxygen demand. Field measurements will be made of specific conductance, pH, air and water temperature, dissolved oxygen, and sediment oxygen demand. Two sets of water-quality data will be collected. One data set will be used to calibrate the model, and the other data set will be used to verity the model.The DAFLOW/BLTM models will be used to evaluate the effects of the treated wastewater on the water quality of the river. The model will simulate specific conductance, temperature, dissolved oxygen, carbonaceous biochemical oxygen demand, total nitrogen (organic, ammonia, nitrite, nitrate), total orthophosphorus, total phosphorus, and phytoplankton as chlorophyll a.The work plan identifies and discusses the work elements needed for accomplishing the data collection for the study. The work elements specify who will provide personnel, vehicles, instruments, and supplies needed during data collection. The work plan contains instructions for data collection; inventory lists of needed personnel, vehicles, instruments, and supplies; and examples of computations for determining quantities of tracer to be injected into the stream. The work plan also contains an annual drought-formation monitoring plan that includes a 9-month time line that specifies when essential planning actions must occur before actual project start up. Drought streamflows are rare. The annual drought-formation monitoring plan is presented to assist project planning by providing early warning that conditions are favorable to produce drought streamflow. The plan to monitor drought-forming conditions discusses the drought indices to be monitored. To establish a baseline, historic values for some of the drought indices for selected years were reviewed. An annual review of the drought indices is recommended.

  6. 77 FR 51044 - Laguna Cartagena National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... plants, haying, research studies, wildlife surveying and monitoring, scientific collections, and camping... interest, including West Indian whistling ducks and kestrels. Under this alternative, specific activities...

  7. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  8. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  9. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  10. 33 CFR 157.12g - Plan approval requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must cover the arrangements and operation of the system as a whole and must specifically describe parts.... This documentation must include the vibration report for the control section of the monitoring section...

  11. [Planning With Nanda, Noc, Nic Taxonomies In Neurologic Rehabilitation. A clinical study].

    PubMed

    Iori, Alessandra; Foracchia, Marco; Gradellini, Cinzia

    2015-01-01

    Nursing classifications identify a specific professional responsibility, increase nursing visibility, according with nursing evolution of these last years. To evaluate care planning with NANDA taxonomy in neurologic rehabilitation context. Care plan managing with NANDA taxonomy, regarding diagnosis of constipation and impaired skin integrity, using a computerized tool for systematically observation, organized in check list. Registered data with taxonomy planning are higher in quantitative and qualitative terms. For most of patients (87%) one diagnosis has been opened, both diagnosis for 60% of them. Nursing care plan with NANDA taxonomy can be considered a valid methodology of care for neurologic patient, this since it requests a deep and complete registration of first assessment a systematically registration of each monitoring, it increases visibility of nursing job, and it underlines specific autonomy and responsibility in prevention and management of problems.

  12. Information Requirements Analyses for Transatmospheric Vehicles

    DTIC Science & Technology

    1992-06-01

    include takeoff inclination, Mach number/fuel burn schedule , planned headings, planned altitudes, threat types/locations, communications satel- lite...network availability schedules , and P/L/target-specific mission events. The mission materials are transferred to the TAV by means of magnetic media...constraints. It also monitors actual fuel consumption, compares it against the mission fuel schedule , predicts rest-of-mission fuel consumption, and

  13. Chapter 10. Developing a habitat monitoring program: three examples from national forest planning

    Treesearch

    Michael I. Goldstein; Lowell H. Suring; Christina D. Vojta; Mary M. Rowland; Clinton. McCarthy

    2013-01-01

    This chapter reviews the process steps of wildlife habitat monitoring described in chapters 2 through 9 and provides three case examples that illustrate how the process steps apply to specific situations. It provides the reader an opportunity to synthesize the material while also revealing the potential knowledge gaps and pitfalls that may complicate completion of a...

  14. 40 CFR 60.5200 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the flow sensor and other necessary equipment in a position that provides a representative flow. (2) Use a flow sensor with a measurement sensitivity of no greater than 2 percent of the expected process... sensor(s) in a position that provides a representative measurement of the pressure (e.g., particulate...

  15. On the role of model-based monitoring for adaptive planning under uncertainty

    NASA Astrophysics Data System (ADS)

    Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn

    2016-04-01

    Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory, triggered by the challenge of uncertainty in operational control, may offer solutions from which monitoring for adaptive planning can benefit. Specifically: (i) in control, observations are incorporated into the model through data assimilation, updating the present state, boundary conditions, and parameters based on new observations, diminishing the shadow of the past; (ii) adaptive control is a way to modify the characteristics of the internal model, incorporating new knowledge on the system, countervailing the inhibition of learning; and (iii) in closed-loop control, a continuous system update equips the controller with "inherent robustness", i.e. to capacity to adapts to new conditions even when these were not initially considered. We aim to explore how inherent robustness addresses the challenge of surprise. Innovations in model-based control might help to improve and adapt the models used to support adaptive delta management to new information (reducing uncertainty). Moreover, this would offer a starting point for using these models not only in the design of adaptive plans, but also as part of the monitoring. The proposed research requires multidisciplinary cooperation between control theory, the policy sciences, and integrated assessment modeling.

  16. Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, Jenny; Lyles, Brad; Cooper, Clay

    Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less

  17. Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites

    USGS Publications Warehouse

    Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.

    2016-01-01

    Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.

  18. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  19. Field-based evaluation of two herbaceous plant community composition sampling methods for long-term monitoring in Northern Great Plains National Parks

    USGS Publications Warehouse

    Symstad, Amy J.; Wienk, Cody L.; Thorstenson, Andy

    2006-01-01

    The Northern Great Plains Inventory & Monitoring (I&M) Network (Network) of the National Park Service (NPS) consists of 13 NPS units in North Dakota, South Dakota, Nebraska, and eastern Wyoming. The Network is in the planning phase of a long-term program to monitor the health of park ecosystems. Plant community composition is one of the 'Vital Signs,' or indicators, that will be monitored as part of this program for three main reasons. First, plant community composition is information-rich; a single sampling protocol can provide information on the diversity of native and non-native species, the abundance of individual dominant species, and the abundance of groups of plants. Second, plant community composition is of specific management concern. The abundance and diversity of exotic plants, both absolute and relative to native species, is one of the greatest management concerns in almost all Network parks (Symstad 2004). Finally, plant community composition reflects the effects of a variety of current or anticipated stressors on ecosystem health in the Network parks including invasive exotic plants, large ungulate grazing, lack of fire in a fire-adapted system, chemical exotic plant control, nitrogen deposition, increased atmospheric carbon dioxide concentrations, and climate change. Before the Network begins its Vital Signs monitoring, a detailed plan describing specific protocols used for each of the Vital Signs must go through rigorous development and review. The pilot study on which we report here is one of the components of this protocol development. The goal of the work we report on here was to determine a specific method to use for monitoring plant community composition of the herb layer (< 2 m tall).

  20. 40 CFR 60.4880 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... this section. (1) Install the flow sensor and other necessary equipment in a position that provides a representative flow. (2) Use a flow sensor with a measurement sensitivity of no greater than 2 percent of the...) Install the pressure sensor(s) in a position that provides a representative measurement of the pressure (e...

  1. 40 CFR 270.315 - What air emissions control information must I keep at my facility?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... specifications listed in 40 CFR 264.1084(e)(1) or (f)(1). (b) Identification of each container area subject to... or containers under requirements of 40 CFR 264.1084(d)(5) or 264.1086(e)(1)(ii). You must include... monitoring plan for both Method 21 in 40 CFR part 60, appendix A and control device monitoring methods. This...

  2. 40 CFR 270.315 - What air emissions control information must I keep at my facility?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... specifications listed in 40 CFR 264.1084(e)(1) or (f)(1). (b) Identification of each container area subject to... or containers under requirements of 40 CFR 264.1084(d)(5) or 264.1086(e)(1)(ii). You must include... monitoring plan for both Method 21 in 40 CFR part 60, appendix A and control device monitoring methods. This...

  3. 40 CFR 270.315 - What air emissions control information must I keep at my facility?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... specifications listed in 40 CFR 264.1084(e)(1) or (f)(1). (b) Identification of each container area subject to... or containers under requirements of 40 CFR 264.1084(d)(5) or 264.1086(e)(1)(ii). You must include... monitoring plan for both Method 21 in 40 CFR part 60, appendix A and control device monitoring methods. This...

  4. 40 CFR 270.315 - What air emissions control information must I keep at my facility?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... specifications listed in 40 CFR 264.1084(e)(1) or (f)(1). (b) Identification of each container area subject to... or containers under requirements of 40 CFR 264.1084(d)(5) or 264.1086(e)(1)(ii). You must include... monitoring plan for both Method 21 in 40 CFR part 60, appendix A and control device monitoring methods. This...

  5. 40 CFR 270.315 - What air emissions control information must I keep at my facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... specifications listed in 40 CFR 264.1084(e)(1) or (f)(1). (b) Identification of each container area subject to... or containers under requirements of 40 CFR 264.1084(d)(5) or 264.1086(e)(1)(ii). You must include... monitoring plan for both Method 21 in 40 CFR part 60, appendix A and control device monitoring methods. This...

  6. School closure as an influenza mitigation strategy: how variations in legal authority and plan criteria can alter the impact.

    PubMed

    Potter, Margaret A; Brown, Shawn T; Cooley, Phillip C; Sweeney, Patricia M; Hershey, Tina B; Gleason, Sherrianne M; Lee, Bruce Y; Keane, Christopher R; Grefenstette, John; Burke, Donald S

    2012-11-14

    States' pandemic influenza plans and school closure statutes are intended to guide state and local officials, but most faced a great deal of uncertainty during the 2009 influenza H1N1 epidemic. Questions remained about whether, when, and for how long to close schools and about which agencies and officials had legal authority over school closures. This study began with analysis of states' school-closure statutes and pandemic influenza plans to identify the variations among them. An agent-based model of one state was used to represent as constants a population's demographics, commuting patterns, work and school attendance, and community mixing patterns while repeated simulations explored the effects of variations in school closure authority, duration, closure thresholds, and reopening criteria. The results show no basis on which to justify statewide rather than school-specific or community-specific authority for school closures. Nor do these simulations offer evidence to require school closures promptly at the earliest stage of an epidemic. More important are criteria based on monitoring of local case incidence and on authority to sustain closure periods sufficiently to achieve epidemic mitigation. This agent-based simulation suggests several ways to improve statutes and influenza plans. First, school closure should remain available to state and local authorities as an influenza mitigation strategy. Second, influenza plans need not necessarily specify the threshold for school closures but should clearly define provisions for early and ongoing local monitoring. Finally, school closure authority may be exercised at the statewide or local level, so long as decisions are informed by monitoring incidence in local communities and schools.

  7. 21 CFR 123.12 - Special requirements for imported products.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the HACCP and sanitation monitoring records required by this part that relate to the specific lot of...) Maintaining on file a copy, in English, of the foreign processor's HACCP plan, and a written guarantee from...

  8. 21 CFR 123.12 - Special requirements for imported products.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the HACCP and sanitation monitoring records required by this part that relate to the specific lot of...) Maintaining on file a copy, in English, of the foreign processor's HACCP plan, and a written guarantee from...

  9. 40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...

  10. 50 CFR 18.124 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... polar bears or Pacific walruses in execution of those activities and you want nonlethal incidental take... operation. (2) A site-specific plan to monitor the effects of the activity on the behavior of polar bears... depending on the activity, the location, and the time of year. (3) A site-specific polar bear and/or walrus...

  11. 50 CFR 18.124 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... polar bears or Pacific walruses in execution of those activities and you want nonlethal incidental take... operation. (2) A site-specific plan to monitor the effects of the activity on the behavior of polar bears... depending on the activity, the location, and the time of year. (3) A site-specific polar bear and/or walrus...

  12. 50 CFR 18.124 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... polar bears or Pacific walruses in execution of those activities and you want nonlethal incidental take... operation. (2) A site-specific plan to monitor the effects of the activity on the behavior of polar bears... depending on the activity, the location, and the time of year. (3) A site-specific polar bear and/or walrus...

  13. 50 CFR 18.124 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... polar bears or Pacific walruses in execution of those activities and you want nonlethal incidental take... operation. (2) A site-specific plan to monitor the effects of the activity on the behavior of polar bears... depending on the activity, the location, and the time of year. (3) A site-specific polar bear and/or walrus...

  14. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  15. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  16. Review of Quantitative Monitoring Methodologies for Emissions Verification and Accounting for Carbon Dioxide Capture and Storage for California’s Greenhouse Gas Cap-and-Trade and Low-Carbon Fuel Standard Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oldenburg, Curtis M.; Birkholzer, Jens T.

    The Cap-and-Trade and Low Carbon Fuel Standard (LCFS) programs being administered by the California Air Resources Board (CARB) include Carbon Dioxide Capture and Storage (CCS) as a potential means to reduce greenhouse gas (GHG) emissions. However, there is currently no universal standard approach that quantifies GHG emissions reductions for CCS and that is suitable for the quantitative needs of the Cap-and-Trade and LCFS programs. CCS involves emissions related to the capture (e.g., arising from increased energy needed to separate carbon dioxide (CO 2) from a flue gas and compress it for transport), transport (e.g., by pipeline), and storage of COmore » 2 (e.g., due to leakage to the atmosphere from geologic CO 2 storage sites). In this project, we reviewed and compared monitoring, verification, and accounting (MVA) protocols for CCS from around the world by focusing on protocols specific to the geologic storage part of CCS. In addition to presenting the review of these protocols, we highlight in this report those storage-related MVA protocols that we believe are particularly appropriate for CCS in California. We find that none of the existing protocols is completely appropriate for California, but various elements of all of them could be adopted and/or augmented to develop a rigorous, defensible, and practical surface leakage MVA protocol for California. The key features of a suitable surface leakage MVA plan for California are that it: (1) informs and validates the leakage risk assessment, (2) specifies use of the most effective monitoring strategies while still being flexible enough to accommodate special or site-specific conditions, (3) quantifies stored CO 2, and (4) offers defensible estimates of uncertainty in monitored properties. California’s surface leakage MVA protocol needs to be applicable to the main CO 2 storage opportunities (in California and in other states with entities participating in California’s Cap-and-Trade or LCFS programs), specifically CO 2-enhanced oil recovery (CO 2-EOR), CO 2 injection into depleted gas reservoirs (with or without CO 2-enhanced gas recovery (CO 2-EGR)), as well as deep saline storage. Regarding the elements of an effective surface leakage MVA protocol, our recommendations for California are that: (1) both CO 2 and methane (CH 4) surface leakage should be monitored, especially for enhanced recovery scenarios, (2) emissions from all sources not directly related to injection and geologic storage (e.g., from capture, or pipeline transport) should be monitored and reported under a plan separate from the surface leakage MVA plan that is included as another component of the quantification methodology (QM), (3) the primary objective of the surface leakage MVA plan should be to quantify surface leakage of CO 2 and CH 4 and its uncertainty, with consideration of best-practices and state-of-the-art approaches to monitoring including attribution assessment, (4) effort should be made to monitor CO 2 storage and migration in the subsurface to anticipate future surface leakage monitoring needs, (5) detailed descriptions of specific monitoring technologies and approaches should be provided in the MVA plan, (6) the main purpose of the CO 2 injection project (CO 2-EOR, CO 2-EGR, or pure geologic carbon sequestration (GCS)) needs to be stated up front, (7) approaches to dealing with missing data and quantifying uncertainty need to be described, and (8) post-injection monitoring should go on for a period consistent with or longer than that prescribed by the U.S. EPA.« less

  17. Use of theoretical waste inventories in planning and monitoring of hazardous waste management systems.

    PubMed

    Yilmaz, Ozge; Can, Zehra S; Toroz, Ismail; Dogan, Ozgur; Oncel, Salim; Alp, Emre; Dilek, Filiz B; Karanfil, Tanju; Yetis, Ulku

    2014-08-01

    Hazardous waste (HW) generation information is an absolute necessity for ensuring the proper planning, implementation, and monitoring of any waste management system. Unfortunately, environmental agencies in developing countries face difficulties in gathering data directly from the creators of such wastes. It is possible, however, to construct theoretical HW inventories using the waste generation factors (WGFs). The objective of this study was to develop a complete nationwide HW inventory of Turkey that relies on nation-specific WGFs to support management activities of the Turkish Ministry of Environment and Urbanization (MoEU). Inventory studies relied on WGFs from: (a) the literature and (b) field studies and analysis of waste declarations reflecting country-specific industrial practices. Moreover, new tools were introduced to the monitoring infrastructure of MoEU to obtain a comprehensive waste generation data set. Through field studies and a consideration of country specific conditions, it was possible to more thoroughly elucidate HW generation trends in Turkey, a method that was deemed superior to other alternatives. Declaration and literature based WGFs also proved most helpful in supplementing field observations that could not always be conducted. It was determined that these theoretical inventories could become valuable assets in supporting regulating agencies in developing countries for a more thorough implementation of HW management systems. © The Author(s) 2014.

  18. Planning Skills and Negotiator Goal Accomplishment: The Relationship between Self-Monitoring and Plan Generation, Plan Enactment, and Plan Consequences.

    ERIC Educational Resources Information Center

    Jordan, Jerry Monroe; Roloff, Michael E.

    1997-01-01

    Focuses on skills necessary for effective negotiation planning. Argues that the information processing tendencies of high self-monitors make them adept at negotiation planning. Extends existing work by relating self-monitoring to plan generation, enactment, and consequences. Indicates that self-monitoring is related to prenegotiation goal…

  19. Monitoring implementation of desertification combating plan using geomatics - A case study, districts Dhar and Jhabua, Madhya Pradesh

    NASA Astrophysics Data System (ADS)

    Arunima, Dasgupta; Dhinwa, P. S.; Rajawat, A. S.

    2015-02-01

    The world's drylands are subject to desertification as a result of extended droughts, climate change, and human activities. Development in drylands depends on addressing degradation of the ecosystem, mainstreaming sustainable natural resources management, and building upon the existing adaptive capacities of communities and institutions. In this regard, recent scientific results aimed to promote sustainable development through action plans for combating desertification. In India, under the Integrated Mission for Sustainable Development (IMSD) programme, remote sensing based integrated land and water resource studies were carried out with an objective to generate locale specific action plans for sustainable development of a region. A specific study was carried out, in districts of Jhabua and Dhar, in Madhya Pradesh using Composite Land Development Sites (CLDS) approach for forest and wasteland development and soil and water conservation. Various treatments were suggested and implemented in 1995. The present study was carried out with an objective to monitor the positive impacts of combating plan implementation through visual interpretation and NDVI analysis of temporal images of LISS III data, since 1991 to 2013. The study reveals that there is substantial increase in the area of irrigated agricultural land with increase in number of check dams along with the stream channels.

  20. Golden Eagle Monitoring Plan for the Desert Renewable Energy Conservation Plan

    USGS Publications Warehouse

    Wiens, David; Kolar, Patrick; Katzner, Todd

    2018-01-01

    This report describes options for monitoring the status and population trends of the golden eagle (Aquila chrysaetos) within the Desert Renewable Energy Conservation Plan (DRECP) area of Southern California in maintaining stable or increasing population in the planning area. The report profiles the ecology of golden eagles in the region and provides a range of potential sampling options to address monitoring needs and objectives. This approach also focused on links between changes in human land-use, golden eagle nesting and foraging habitat conditions, and population dynamics. The report outlines how monitoring data from demographic, prey, and habitat studies were used to develop a predictive demographic model for golden eagles in the DRECP area. Results from the model simulations suggest increases in renewable energy development could have negative consequences for population trajectories. Results also suggest site-specific conservation actions could reduce the magnitude of negative impacts to the local population of eagles. A monitoring framework is proposed including: (1) annual assessments of site-occupancy and reproduction by territorial pairs of golden eagles (including rates at which sites become colonized or vacated over time); (2) estimates of survival, movements, and intensity of use of landscapes by breeding and non-breeding golden eagles; (3) periodic (conducted every two to four years) assessments of nesting and foraging habitats, prey populations, and associations with land-use and management activities; and (4) updating the predictive demographic model with new information obtained on eagles and associated population stressors. The results of this research were published in the Journal of Rapture Research, Wiens, David,Inman, Rich D., Esque, Todd C., Longshore, Kathleen M. and Nussear, Kenneth (2017). Spatial Demographic Models to Inform Conservation Planning of Golden Eagles in Renewable Energy Landscapes. 51(3):234-257.

  1. Much ado about SEA/SA monitoring: The performance of English Regional Spatial Strategies, and some German comparisons

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanusch, Marie; Glasson, John

    Strategic Environmental Assessment (SEA) seeks to better integrate environmental considerations into the preparation and decision-making process of plans and programmes with a view to promoting sustainable development. Further to application of the European Directive 2001/42/EC (SEA Directive) in 2004, the body of practical SEA experience, and parallel research, has increased steadily. Yet there is a crucial element of SEA which cannot build on much experience but whose importance will grow over time - namely that of SEA monitoring. The paper explores the application of SEA monitoring for English Regional Spatial Strategies (RSSs). It briefly introduces the role of SEA monitoringmore » and its legal requirements, the English approach of integrating SEA into Sustainability Appraisal (SA) and the nature of the current English Regional Planning context. The main part presents the research findings and discusses how practitioners cope with the challenges of SEA/SA monitoring - with guiding questions: why, what, who, how, when, and with what outcomes? Reflecting that monitoring is just about to start, the paper draws on measures envisaged for monitoring in the SA reports prepared for RSS, and on expert interviews. It identifies monitoring trends and highlights workable approaches as well as shortcomings. For a critical reflection the findings are mirrored briefly with SEA monitoring approaches of German Regional Plans. Although it is still early days for such monitoring, the findings indicate that there is a danger that some of the specific requirements and objectives of SEA/SA monitoring are not fully met, mainly due to insufficient databases, inappropriate institutional conditions and limited personnel and financial resources. Some recommendations are offered in conclusion.« less

  2. A modular telerobotic task execution system

    NASA Technical Reports Server (NTRS)

    Backes, Paul G.; Tso, Kam S.; Hayati, Samad; Lee, Thomas S.

    1990-01-01

    A telerobot task execution system is proposed to provide a general parametrizable task execution capability. The system includes communication with the calling system, e.g., a task planning system, and single- and dual-arm sensor-based task execution with monitoring and reflexing. A specific task is described by specifying the parameters to various available task execution modules including trajectory generation, compliance control, teleoperation, monitoring, and sensor fusion. Reflex action is achieved by finding the corresponding reflex action in a reflex table when an execution event has been detected with a monitor.

  3. Monitoring the southwestern Wyoming landscape—A foundation for management and science

    USGS Publications Warehouse

    Manier, Daniel J.; Anderson, Patrick J.; Assal, Timothy J.; Chong, Geneva W.; Melcher, Cynthia P.

    2017-08-29

    Natural resource monitoring involves repeated collections of resource condition data and analyses to detect possible changes and identify underlying causes of changes. For natural resource agencies, monitoring provides the foundation for management and science. Specifically, analyses of monitoring data allow managers to better understand effects of land-use and other changes on important natural resources and to achieve their conservation and management goals. Examples of natural resources monitored on public lands include wildlife habitats, plant productivity, animal movements and population trends, soil chemistry, and water quality and quantity. Broader definitions of monitoring also recognize the need for scientifically valid data to help support planning efforts and informed decisions, to develop adaptive management strategies, and to provide the means for evaluating management outcomes.

  4. A participatory approach to design monitoring indicators of production diseases in organic dairy farms.

    PubMed

    Duval, J E; Fourichon, C; Madouasse, A; Sjöström, K; Emanuelson, U; Bareille, N

    2016-06-01

    Production diseases have an important negative effect on the health and welfare of dairy cows. Although organic animal production systems aim for high animal health levels, compliance with European organic farming regulations does not guarantee that this is achieved. Herd health and production management (HHPM) programs aim at optimizing herd health by preventing disease and production problems, but as yet they have not been consistently implemented by farmers. We hypothesize that one reason is the mismatch between what scientists propose as indicators for herd health monitoring and what farmers would like to use. Herd health monitoring is a key element in HHPM programs as it permits a regular assessment of the functioning of the different components of the production process. Planned observations or measurements of these components are indispensable for this monitoring. In this study, a participatory approach was used to create an environment in which farmers could adapt the indicators proposed by scientists for monitoring the five main production diseases on dairy cattle farms. The adaptations of the indicators were characterized and the farmers' explanations for the changes made were described. The study was conducted in France and Sweden, which differ in terms of their national organic regulations and existing advisory services. In both countries, twenty certified organic dairy farmers and their animal health management advisors participated in the study. All of the farmers adapted the initial monitoring plan proposed by scientists to specific production and animal health situation on their farm. This resulted in forty unique and farm-specific combinations of indicators for herd health monitoring. All but three farmers intended to monitor five health topics simultaneously using the constructed indicators. The qualitative analysis of the explanations given by farmers for their choices enabled an understanding of farmers' reasons for selecting and adapting indicators. This is valuable information for scientists involved in the design of HHPM programs. Advisors in the field also can benefit from this participatory approach because it transforms monitoring tools provided by scientists into farm-specific tools. Copyright © 2016 Elsevier B.V. All rights reserved.

  5. Test/QA Plan for Verification of Nitrate Sensors for Groundwater Remediation Monitoring

    EPA Science Inventory

    A submersible nitrate sensor is capable of collecting in-situ measurements of dissolved nitrate concentrations in groundwater. Although several types of nitrate sensors currently exist, this verification test will focus on submersible sensors equipped with a nitrate-specific ion...

  6. Nuclear rocket propulsion. NASA plans and progress, FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space explorer initiative (SEI) human and robotic missions to the moon and Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  7. Nuclear rocket propulsion: NASA plans and progress - FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space exploration initiative (SEI) human and robotic missions to the Moon and to Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  8. Designing a patient monitoring system for bipolar disorder using Semantic Web technologies.

    PubMed

    Thermolia, Chryssa; Bei, Ekaterini S; Petrakis, Euripides G M; Kritsotakis, Vangelis; Tsiknakis, Manolis; Sakkalis, Vangelis

    2015-01-01

    The new movement to personalize treatment plans and improve prediction capabilities is greatly facilitated by intelligent remote patient monitoring and risk prevention. This paper focuses on patients suffering from bipolar disorder, a mental illness characterized by severe mood swings. We exploit the advantages of Semantic Web and Electronic Health Record Technologies to develop a patient monitoring platform to support clinicians. Relying on intelligently filtering of clinical evidence-based information and individual-specific knowledge, we aim to provide recommendations for treatment and monitoring at appropriate time or concluding into alerts for serious shifts in mood and patients' non response to treatment.

  9. Bathymetric surveys of the Kootenai River near Bonners Ferry, Idaho, water year 2011

    USGS Publications Warehouse

    Fosness, Ryan L.

    2013-01-01

    In 2009, the Kootenai Tribe of Idaho released and implemented the Kootenai River Habitat Restoration Master Plan. This plan aimed to restore, enhance, and maintain the Kootenai River habitat and landscape to support and sustain habitat conditions for aquatic species and animal populations. In support of these restoration efforts, the U.S. Geological Survey, in cooperation with the Kootenai Tribe of Idaho, conducted high-resolution multibeam echosounder bathymetric surveys in May, June, and July 2011, as a baseline bathymetric monitoring survey on the Kootenai River near Bonners Ferry, Idaho. Three channel patterns or reaches exist in the study area—braided, meander, and a transitional zone connecting the braided and meander reaches. Bathymetric data were collected at three study areas in 2011 to provide: (1) surveys in unmapped portions of the meander reach; (2) monitoring of the presence and extent of sand along planned lines within a section of the meander reach; and (3) monitoring aggradation and degradation of the channel bed at specific cross sections within the braided reach and transitional zone. The bathymetric data will be used to update and verify flow models, calibrate and verify sediment transport modeling efforts, and aid in the biological assessment in support of the Kootenai River Habitat Restoration Master Plan. The data and planned lines for each study reach were produced in ASCII XYZ format supported by most geospatial software.

  10. 6. Monitoring and the Northwest Forest Plan

    Treesearch

    Leslie M. Reid

    1994-01-01

    Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...

  11. A systematic approach to the planning, implementation, monitoring, and evaluation of integrated health services.

    PubMed

    Reynolds, Heidi W; Sutherland, Elizabeth G

    2013-05-06

    Because of the current emphasis and enthusiasm focused on integration of health systems, there is a risk of piling resources into integrated strategies without the necessary systems in place to monitor their progress adequately or to measure impact, and to learn from these efforts. The rush to intervene without adequate monitoring and evaluation will continue to result in a weak evidence base for decision making and resource allocation. Program planning and implementation are inextricability linked to monitoring and evaluation. Country level guidance is needed to identify country-specific integrated strategies, thereby increasing country ownership. This paper focuses on integrated health services but takes into account how health services are influenced by the health system, managed by programs, and made up of interventions. We apply the principles in existing comprehensive monitoring and evaluation (M&E) frameworks in order to outline a systematic approach to the M&E of integration for the country level. The approach is grounded by first defining the country-specific health challenges that integration is intended to affect. Priority points of contact for care can directly influence health, and essential packages of integration for all major client presentations need to be defined. Logic models are necessary to outline the plausible causal pathways and define the inputs, roles and responsibilities, indicators, and data sources across the health system. Finally, we recommend improvements to the health information system and in data use to ensure that data are available to inform decisions, because changes in the M&E function to make it more integrated will also facilitate integration in the service delivery, planning, and governance components. This approach described in the paper is the ideal, but its application at the country level can help reveal gaps and guide decisions related to what health services to prioritize for integration, help plan for how to strengthen systems to support health services, and ultimately establish an evidence base to inform investments in health care. More experience is needed to understand if the approach is feasible; similarly, more emphasis is needed on documenting the process of designing and implemented integrated interventions at the national level.

  12. Using Bayesian networks to support decision-focused information retrieval

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehner, P.; Elsaesser, C.; Seligman, L.

    This paper has described an approach to controlling the process of pulling data/information from distributed data bases in a way that is specific to a persons specific decision making context. Our prototype implementation of this approach uses a knowledge-based planner to generate a plan, an automatically constructed Bayesian network to evaluate the plan, specialized processing of the network to derive key information items that would substantially impact the evaluation of the plan (e.g., determine that replanning is needed), automated construction of Standing Requests for Information (SRIs) which are automated functions that monitor changes and trends in distributed data base thatmore » are relevant to the key information items. This emphasis of this paper is on how Bayesian networks are used.« less

  13. Innovative applications of artificial intelligence

    NASA Astrophysics Data System (ADS)

    Schorr, Herbert; Rappaport, Alain

    Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.

  14. 40 CFR 141.601 - Standard monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Standard monitoring. 141.601 Section... Standard monitoring. (a) Standard monitoring plan. Your standard monitoring plan must comply with paragraphs (a)(1) through (a)(4) of this section. You must prepare and submit your standard monitoring plan...

  15. Instrumentation Guidelines for the Advanced National Seismic System

    USGS Publications Warehouse

    Working Group on Instrumentation, Siting

    2008-01-01

    This document provides guidelines for the seismic-monitoring instrumentation used by long-term earthquake-monitoring stations that will sense ground motion, digitize and store the resulting signals in a local data acquisition unit, and optionally transmit these digital data. These guidelines are derived from specifications and requirements for data needed to address the nation's emergency response, engineering, and scientific needs as identified in U.S. Geological Survey Circular 1188 (1999). Data needs are discussed in terms of national, regional, and urban scales of monitoring in section 3. Functional performance specifications for instrumentation are introduced in section 4.3 and discussed in detail in section 6 in terms of instrument classes and definitions described in section 5. System aspects and testing recommendations are discussed in sections 7 and 8, respectively. Although U.S. Geological Survey Circular 1188 (1999) recommends that the Advanced National Seismic System (ANSS) include portable instrumentation, performance specifications for this element are not specifically addressed in this document. Nevertheless, these guidelines are largely applicable to portable instrumentation. Volcano monitoring instrumentation is also beyond the scope of this document. Guidance for ANSS structural-response monitoring is discussed briefly herein but details are deferred to the ANSS document by the ANSS Structural Response Monitoring Committee (U.S. Geological Survey, 2005). Aspects of station planning, siting, and installation other than instrumentation are beyond the scope of this document.

  16. 40 CFR 75.62 - Monitoring plan submittals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... representative for an affected unit shall submit a complete, electronic, up-to-date monitoring plan file (except... quarterly report for a reporting quarter where an update of the electronic monitoring plan information is... associated, pursuant to § 75.53(b). Electronic submittal of all monitoring plan information, including...

  17. 50 CFR 216.105 - Specific regulations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for the independent peer-review of proposed monitoring plans where the proposed activity may affect... MAMMALS General Regulations Governing Small Takes of Marine Mammals Incidental to Specified Activities... must provide the information requested in § 216.104(a) on their activity as a whole, which includes...

  18. 50 CFR 216.105 - Specific regulations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for the independent peer-review of proposed monitoring plans where the proposed activity may affect... MAMMALS General Regulations Governing Small Takes of Marine Mammals Incidental to Specified Activities... must provide the information requested in § 216.104(a) on their activity as a whole, which includes...

  19. 50 CFR 216.105 - Specific regulations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for the independent peer-review of proposed monitoring plans where the proposed activity may affect... MAMMALS General Regulations Governing Small Takes of Marine Mammals Incidental to Specified Activities... must provide the information requested in § 216.104(a) on their activity as a whole, which includes...

  20. 50 CFR 216.105 - Specific regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for the independent peer-review of proposed monitoring plans where the proposed activity may affect... MAMMALS General Regulations Governing Small Takes of Marine Mammals Incidental to Specified Activities... must provide the information requested in § 216.104(a) on their activity as a whole, which includes...

  1. 50 CFR 216.105 - Specific regulations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for the independent peer-review of proposed monitoring plans where the proposed activity may affect... MAMMALS General Regulations Governing Small Takes of Marine Mammals Incidental to Specified Activities... must provide the information requested in § 216.104(a) on their activity as a whole, which includes...

  2. Case Management and Rehabilitation Counseling: Procedures and Techniques. Fourth Edition

    ERIC Educational Resources Information Center

    Roessler, Richard T.; Rubin, Stanford E.

    2006-01-01

    "Case Management and Rehabilitation Counseling" discusses procedures that are useful to rehabilitation professionals working in many settings. Specifically, this book reviews the finer points relating to diagnosing, arranging services, monitoring program outcomes, arranging for placement, planning for accommodations, ethical decision making,…

  3. 77 FR 37248 - Delegations of Authority for the Office of Housing-Federal Housing Administration (FHA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... office develops and implements policies and guidelines for the loan origination, construction, asset.... It develops and implements policies and guidelines for plans and specifications, construction contracts, construction monitoring, construction draws, and closeout of the facility construction. This...

  4. Developing a Ruggedized User-Friendly UAS for Monitoring Volcanic Emissions

    NASA Astrophysics Data System (ADS)

    Wardell, L. J.; Elston, J. S.; Stachura, M.

    2017-12-01

    Using lessons learned from a history of airborne volcano measurements and a range of UAS R&D, a reliable and ruggedized UAS is being developed specifically for volcano monitoring and response. A key feature is the user interface (UI) that allows for a menu of automated flight plans that will account for terrain and sensor requirements. Due to variation in response times of miniaturized airborne the sensors, flight plan options are extended to account for sensor lag when needed. By automating such complicating variables into the UI, the amount of background and training needed for operation is further minimized. Payload options include simultaneous in situ gas and particle sensors combined with downward-looking imagers to provide a wide range of data products. Currently under development by Black Swift Technologies, the latest updates and test results will be presented. Specifications of the Superswift airframe include a 6,000 m flight ceiling, 2.4 kg payload capacity, and 2 hr endurance.

  5. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007more » investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.« less

  6. Marine spatial planning in practice

    NASA Astrophysics Data System (ADS)

    Collie, Jeremy S.; (Vic) Adamowicz, W. L.; Beck, Michael W.; Craig, Bethany; Essington, Timothy E.; Fluharty, David; Rice, Jake; Sanchirico, James N.

    2013-01-01

    Multiple competing uses of continental-shelf environments have led to a proliferation of marine spatial planning initiatives, together with expert guidance on marine spatial planning. This study provides an empirical review of marine spatial plans, their attributes, and the extent to which the expert guidance is actually being followed. We performed a structured review of 16 existing marine spatial plans and created an idealized marine spatial plan from the steps included in recent expert papers. A cluster analysis of the yes/no answers to 28 questions was used to ordinate the 16 marine spatial plans and to compare them with the idealized plan. All the plans that have been implemented have a high-level government mandate and the authority to implement spatial planning vested in existing institutions. Almost all the plans used data with clear criteria for data inclusion. Stakeholders were included in almost all the plans; they did not participate in all stages of the planning process but their roles were generally clearly defined. Decision-support tools were applied inconsistently across plans and were seldom used dynamically over time. Most spatial planning processes did not select specific outcomes, such as preferred use scenarios. Success is defined inconsistently across plans; in half the cases there are no metrics of success with reference benchmarks. Although monitoring is included in the majority of plans, only in some cases do monitoring results feed back into management decisions. The process of marine spatial planning had advanced in that some of the more recent plans were developed more quickly and contain more desirable attributes than earlier plans. Even so, existing marine spatial plans are heterogeneous—there are essential ingredients, but no single recipe for success.

  7. Integrated controls and health monitoring for chemical transfer propulsion

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.; Binder, Michael P.

    1990-01-01

    NASA is reviewing various propulsion technologies for exploring space. The requirements are examined for one enabling propulsion technology: Integrated Controls and Health Monitoring (ICHM) for Chemical Transfer Propulsion (CTP). Functional requirements for a CTP-ICHM system are proposed from tentative mission scenarios, vehicle configurations, CTP specifications, and technical feasibility. These CTP-ICHM requirements go beyond traditional reliable operation and emergency shutoff control to include: (1) enhanced mission flexibility; (2) continuously variable throttling; (3) tank-head start control; (4) automated prestart and post-shutoff engine check; (5) monitoring of space exposure degradation; and (6) product evolution flexibility. Technology development plans are also discussed.

  8. State Compensatory Education Annual Report, 1982-83.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta. Office of Instructional Services.

    This document compiles compensatory education program data submitted to the Georgia State Department by local school systems in their 1982-83 annual reports. The first section describes state administration of grant funds (i.e., appropriations bills, procedures for allocating funds, program plans, and program monitoring). Specifically mentioned…

  9. 36 CFR 219.11 - Monitoring and evaluation for adaptive management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sustainability in the plan area (§§ 219.19 through 219.21). The strategy must require monitoring of appropriate plan decisions and characteristics of sustainability. (1) Monitoring and evaluation of ecological sustainability. The plan monitoring strategy for the monitoring and evaluation of ecological sustainability must...

  10. Clinician impression versus prescription drug monitoring program criteria in the assessment of drug-seeking behavior in the emergency department.

    PubMed

    Weiner, Scott G; Griggs, Christopher A; Mitchell, Patricia M; Langlois, Breanne K; Friedman, Franklin D; Moore, Rebecca L; Lin, Shuo Cheng; Nelson, Kerrie P; Feldman, James A

    2013-10-01

    We compare emergency provider impression of drug-seeking behavior with objective criteria from a state prescription drug monitoring program, assess change in opioid pain reliever prescribing after prescription drug monitoring program review, and examine clinical factors associated with suspected drug-seeking behavior. This was a prospective observational study of emergency providers assessing a convenience sample of patients aged 18 to 64 years who presented to either of 2 academic medical centers with chief complaint of back pain, dental pain, or headache. Drug-seeking behavior was objectively defined as present when a patient had greater than or equal to 4 opioid prescriptions by greater than or equal to 4 providers in the 12 months before emergency department evaluation. Emergency providers completed data forms recording their impression of the likelihood of drug-seeking behavior, patient characteristics, and plan for prescribing pre- and post-prescription drug monitoring program review. Descriptive statistics were generated. We calculated agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program definition, and sensitivity, specificity, and positive predictive value of emergency provider impression, using prescription drug monitoring program criteria as the criterion standard. A multivariate logistic regression analysis was conducted to determine clinical factors associated with drug-seeking behavior. Thirty-eight emergency providers with prescription drug monitoring program access participated. There were 544 patient visits entered into the study from June 2011 to January 2013. There was fair agreement between emergency provider impression of drug-seeking behavior and prescription drug monitoring program (κ=0.30). Emergency providers had sensitivity 63.2% (95% confidence interval [CI] 54.8% to 71.7%), specificity 72.7% (95% CI 68.4% to 77.0%), and positive predictive value 41.2% (95% CI 34.4% to 48.2%) for identifying drug-seeking behavior. After exposure to prescription drug monitoring program data, emergency providers changed plans to prescribe opioids at discharge in 9.5% of cases (95% CI 7.3% to 12.2%), with 6.5% of patients (n=35) receiving opioids not previously planned and 3.0% (n=16) no longer receiving opioids. Predictors for drug-seeking behavior by prescription drug monitoring program criteria were patient requests opioid medications by name (odds ratio [OR] 1.91; 95% CI 1.13 to 3.23), multiple visits for same complaint (OR 2.5; 95% CI 1.49 to 4.18), suspicious history (OR 1.88; 95% CI 1.1 to 3.19), symptoms out of proportion to examination (OR 1.83; 95% CI 1.1 to 3.03), and hospital site (OR 3.1; 95% CI 1.76 to 5.44). Emergency providers had fair agreement with objective criteria from the prescription drug monitoring program in suspecting drug-seeking behavior. Program review changed management plans in a small number of cases. Multiple clinical factors were predictive of drug-seeking behavior. Copyright © 2013 American College of Emergency Physicians. Published by Mosby, Inc. All rights reserved.

  11. 36 CFR 219.5 - Information development and interpretation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., monitoring results, and other studies are not site-specific or plan decisions or proposals for agency action... assessments provide information regarding ecological, economic, or social issues that are broad in geographic... analyses that may be provided in an assessment are addressed in § 219.20(a). Social and economic...

  12. 36 CFR 219.5 - Information development and interpretation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., monitoring results, and other studies are not site-specific or plan decisions or proposals for agency action... assessments provide information regarding ecological, economic, or social issues that are broad in geographic... analyses that may be provided in an assessment are addressed in § 219.20(a). Social and economic...

  13. Spatial demographic models to inform conservation planning of golden eagles in renewable energy landscapes.

    EPA Science Inventory

    Spatial demographic models can help guide monitoring and management activities targeting at-risk species, even in cases where baseline data are lacking. Here, we provide an example of how site-specific changes in land-use and other anthropogenic stressors can be incorporated int...

  14. Monitoring Sustainable Development Goal 3: how ready are the health information systems in low-income and middle-income countries?

    PubMed

    Nabyonga-Orem, Juliet

    2017-01-01

    Sustainable Development Goals (SDGs) present a broader scope and take a holistic multisectoral approach to development as opposed to the Millennium Development Goals (MDGs). While keeping the health MDG agenda, SDG3 embraces the growing challenge of non-communicable diseases and their risk factors. The broader scope of the SDG agenda, the need for a multisectoral approach and the emphasis on equity present monitoring challenges to health information systems of low-income and middle-income countries. The narrow scope and weaknesses in existing information systems, a multiplicity of data collection systems designed along disease programme and the lack of capacity for data analysis are among the limitations to be addressed. On the other hand, strong leadership and a comprehensive and longer-term approach to strengthening a unified health information system are beneficial. Strengthening country capacity to monitor SDGs will involve several actions: domestication of the SDG agenda through country-level planning and monitoring frameworks, prioritisation of interventions, indicators and setting country-specific targets. Equity stratifiers should be country specific in addressing policy concerns. The scope of existing information systems should be broadened in line with the SDG agenda monitoring requirements and strengthened to produce reliable data in a timely manner and capacity for data analysis and use of data built. Harnessing all available opportunities, emphasis should be on strengthening health sector as opposed to SDG3 monitoring. In this regard, information systems in related sectors and the private sector should be strengthened and data sharing institutionalised. Data are primarily needed to inform planning and decision-making beyond SGD3 reporting requirements.

  15. Monitoring Sustainable Development Goal 3: how ready are the health information systems in low-income and middle-income countries?

    PubMed Central

    Nabyonga-Orem, Juliet

    2017-01-01

    Sustainable Development Goals (SDGs) present a broader scope and take a holistic multisectoral approach to development as opposed to the Millennium Development Goals (MDGs). While keeping the health MDG agenda, SDG3 embraces the growing challenge of non-communicable diseases and their risk factors. The broader scope of the SDG agenda, the need for a multisectoral approach and the emphasis on equity present monitoring challenges to health information systems of low-income and middle-income countries. The narrow scope and weaknesses in existing information systems, a multiplicity of data collection systems designed along disease programme and the lack of capacity for data analysis are among the limitations to be addressed. On the other hand, strong leadership and a comprehensive and longer-term approach to strengthening a unified health information system are beneficial. Strengthening country capacity to monitor SDGs will involve several actions: domestication of the SDG agenda through country-level planning and monitoring frameworks, prioritisation of interventions, indicators and setting country-specific targets. Equity stratifiers should be country specific in addressing policy concerns. The scope of existing information systems should be broadened in line with the SDG agenda monitoring requirements and strengthened to produce reliable data in a timely manner and capacity for data analysis and use of data built. Harnessing all available opportunities, emphasis should be on strengthening health sector as opposed to SDG3 monitoring. In this regard, information systems in related sectors and the private sector should be strengthened and data sharing institutionalised. Data are primarily needed to inform planning and decision-making beyond SGD3 reporting requirements. PMID:29104767

  16. Tools to improve planning, implementation, monitoring, and evaluation of complementary feeding programmes.

    PubMed

    Untoro, Juliawati; Childs, Rachel; Bose, Indira; Winichagoon, Pattanee; Rudert, Christiane; Hall, Andrew; de Pee, Saskia

    2017-10-01

    Adequate nutrient intake is a prerequisite for achieving good nutrition status. Suboptimal complementary feeding practices are a main risk factor for stunting. The need for systematic and user-friendly tools to guide the planning, implementation, monitoring, and evaluation of dietary interventions for children aged 6-23 months has been recognized. This paper describes five tools, namely, ProPAN, Optifood, Cost of the Diet, Fill the Nutrient Gap, and Monitoring Results for Equity System that can be used in different combinations to improve situation analysis, planning, implementation, monitoring, or evaluation approaches for complementary feeding in a particular context. ProPAN helps with development of strategies and activities designed to change the behaviours of the target population. Optifood provides guidance for developing food-based recommendations. The Cost of the Diet can provide insight on economic barriers to accessing a nutritious and balanced diet. The Fill the Nutrient Gap facilitates formulation of context-specific policies and programmatic approaches to improve nutrient intake, through a multistakeholder process that uses insights from linear programming and secondary data. The Monitoring Results for Equity System helps with analysis of gaps, constraints, and determinants of complementary feeding interventions and adoption of recommended practices especially in the most vulnerable and deprived populations. These tools, and support for their use, are readily available and can be used either alone and/or complementarily throughout the programme cycle to improve infant and young child-feeding programmes at subnational and national levels. © 2017 John Wiley & Sons Ltd.

  17. An effectiveness monitoring program for the northwest forest plan: new approaches to common monitoring problems

    Treesearch

    Craig Palmer; Barry Mulder; Barry Noon

    2000-01-01

    The Northwest Forest Plan is a large-scale ecosystem management plan for federal lands in the Pacific Northwest of the United States. An effectiveness monitoring program has been developed to determine the extent to which the goals and objectives of this Plan are being achieved. Priority resources identified for ecological monitoring include late-successional and old-...

  18. Environmental monitoring plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holland, R.C.

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  19. A study of mass data storage technology for rocket engine data

    NASA Technical Reports Server (NTRS)

    Ready, John F.; Benser, Earl T.; Fritz, Bernard S.; Nelson, Scott A.; Stauffer, Donald R.; Volna, William M.

    1990-01-01

    The results of a nine month study program on mass data storage technology for rocket engine (especially the Space Shuttle Main Engine) health monitoring and control are summarized. The program had the objective of recommending a candidate mass data storage technology development for rocket engine health monitoring and control and of formulating a project plan and specification for that technology development. The work was divided into three major technical tasks: (1) development of requirements; (2) survey of mass data storage technologies; and (3) definition of a project plan and specification for technology development. The first of these tasks reviewed current data storage technology and developed a prioritized set of requirements for the health monitoring and control applications. The second task included a survey of state-of-the-art and newly developing technologies and a matrix-based ranking of the technologies. It culminated in a recommendation of optical disk technology as the best candidate for technology development. The final task defined a proof-of-concept demonstration, including tasks required to develop, test, analyze, and demonstrate the technology advancement, plus an estimate of the level of effort required. The recommended demonstration emphasizes development of an optical disk system which incorporates an order-of-magnitude increase in writing speed above the current state of the art.

  20. 50 CFR 216.275 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...

  1. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less

  2. Modulation of auditory processing during speech movement planning is limited in adults who stutter

    PubMed Central

    Daliri, Ayoub; Max, Ludo

    2015-01-01

    Stuttering is associated with atypical structural and functional connectivity in sensorimotor brain areas, in particular premotor, motor, and auditory regions. It remains unknown, however, which specific mechanisms of speech planning and execution are affected by these neurological abnormalities. To investigate pre-movement sensory modulation, we recorded 12 stuttering and 12 nonstuttering adults’ auditory evoked potentials in response to probe tones presented prior to speech onset in a delayed-response speaking condition vs. no-speaking control conditions (silent reading; seeing nonlinguistic symbols). Findings indicate that, during speech movement planning, the nonstuttering group showed a statistically significant modulation of auditory processing (reduced N1 amplitude) that was not observed in the stuttering group. Thus, the obtained results provide electrophysiological evidence in support of the hypothesis that stuttering is associated with deficiencies in modulating the cortical auditory system during speech movement planning. This specific sensorimotor integration deficiency may contribute to inefficient feedback monitoring and, consequently, speech dysfluencies. PMID:25796060

  3. Malaysia's Experience in the Monitoring of Investment and Results of Water Resources Management

    NASA Astrophysics Data System (ADS)

    Zakaria, Salmah Binti; Lee, Jin

    2010-05-01

    The current status of IWRM implementation in Malaysia, overview of development planning process and financial allocations together with monitoring of IWRM in Malaysia are first presented. This is followed by a case study review of Malaysia's 9th 5-year Development Plan (2005-2010) so as to provide a deeper understanding and appreciation of the current approach adopted by the Malaysian government in the formulation of development policies, project planning, budget allocation and o monitoring of projects. Arising from the review it was highlighted that the water-related, sectoral developmental objectives are found in all the 5 developmental thrusts in the 9th Malaysia Plan. This is because water is an essential natural resource and is also an economic good. Thus, it was concluded that in order for the monitoring of investments in IWRM and results to be effective and useful to support policy formulation to achieve the goal of IWRM there is a need for a collation of all information reported under the different, water-related, sectoral developmental objectives in the 9th Malaysia Plan to be organised within an IWRM framework. It was also concluded that a major IWRM challenge for Malaysia is how to make the transition from the current, narrow, sector-specific, financial and budgeting paradigm of the sectorial agencies to the “total cost” paradigm that involves taking into consideration and integrating the costs in other sectors affected by any projects proposed within a sector. The current, sectorial-focus approach, adopted in the 9th Malaysia Plan, logically measures the effectiveness of sectorial agencies by their ability to achieve their immediate sectorial goals and targets, most often with emphasis on infrastructure projects since the impacts of such projects are usually immediate and visible. However, the use of such approach alone, without taking into account the costs that are borne by other interfacing sectors, and also within the sector over the long term, is unsustainable.

  4. Developing the Tools for Geologic Repository Monitoring - Andra's Monitoring R and D Program - 12045

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buschaert, S.; Lesoille, S.; Bertrand, J.

    2012-07-01

    The French Safety Guide recommends that Andra develop a monitoring program to be implemented during repository construction and conducted until (and possibly after) closure, in order to confirm expected behavior and enhance knowledge of relevant processes. To achieve this, Andra has developed an overall monitoring strategy and identified specific technical objectives to inform disposal process management on evolutions relevant to both the long term safety and reversible, pre-closure management of the repository. Andra has launched an ambitious R and D program to ensure that reliable, durable, metrologically qualified and tested monitoring systems will be available at the time of repositorymore » construction in order to respond to monitoring objectives. After four years of a specific R and D program, first observations are described and recommendations are proposed. The results derived from 4 years of Andra's R and D program allow three main observations to be shared. First, while other industries also invest in monitoring equipment, their obvious emphasis will always be on their specific requirements and needs, thus often only providing a partial match with repository requirements. Examples can be found for all available sensors, which are generally not resistant to radiation. Second, the very close scrutiny anticipated for the geologic disposal process is likely to place an unprecedented emphasis on the quality of monitoring results. It therefore seems important to emphasize specific developments with an aim at providing metrologically qualified systems. Third, adapting existing technology to specific repository needs, and providing adequate proof of their worth, is a lengthy process. In conclusion, it therefore seems prudent to plan ahead and to invest wisely in the adequate development of those monitoring tools that will likely be needed in the repository to respond to the implementers' and regulators' requirements, including those agreed and developed to respond to potential stakeholder expectations. (authors)« less

  5. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  6. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael G.

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  7. Automated analysis of complex data

    NASA Technical Reports Server (NTRS)

    Saintamant, Robert; Cohen, Paul R.

    1994-01-01

    We have examined some of the issues involved in automating exploratory data analysis, in particular the tradeoff between control and opportunism. We have proposed an opportunistic planning solution for this tradeoff, and we have implemented a prototype, Igor, to test the approach. Our experience in developing Igor was surprisingly smooth. In contrast to earlier versions that relied on rule representation, it was straightforward to increment Igor's knowledge base without causing the search space to explode. The planning representation appears to be both general and powerful, with high level strategic knowledge provided by goals and plans, and the hooks for domain-specific knowledge are provided by monitors and focusing heuristics.

  8. Remote monitoring as a tool in condition assessment of a highway bridge

    NASA Astrophysics Data System (ADS)

    Tantele, Elia A.; Votsis, Renos A.; Onoufriou, Toula; Milis, Marios; Kareklas, George

    2016-08-01

    The deterioration of civil infrastructure and their subsequent maintenance is a significant problem for the responsible managing authorities. The ideal scenario is to detect deterioration and/or structural problems at early stages so that the maintenance cost is kept low and the safety of the infrastructure remains undisputed. The current inspection regimes implemented mostly via visual inspection are planned at specific intervals but are not always executed on time due to shortcomings in expert personnel and finance. However the introduction of technological advances in the assessment of infrastructures provides the tools to alleviate this problem. This study describes the assessment of a highway RC bridge's structural condition using remote structural health monitoring. A monitoring plan is implemented focusing on strain measurements; as strain is a parameter influenced by the environmental conditions supplementary data are provided from temperature and wind sensors. The data are acquired using wired sensors (deployed at specific locations) which are connected to a wireless sensor unit installed at the bridge. This WSN application enables the transmission of the raw data from the field to the office for processing and evaluation. The processed data are then used to assess the condition of the bridge. This case study, which is part of an undergoing RPF research project, illustrates that remote monitoring can alleviate the problem of missing structural inspections. Additionally, shows its potential to be the main part of a fully automated smart procedure of obtaining structural data, processed them and trigger an alarm when certain undesirable conditions are met.

  9. Ranch business planning and resource monitoring for rangeland sustainability

    Treesearch

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coble, Jamie B.; Coles, Garill A.; Ramuhalli, Pradeep

    Advanced small modular reactors (aSMRs) can provide the United States with a safe, sustainable, and carbon-neutral energy source. The controllable day-to-day costs of aSMRs are expected to be dominated by operation and maintenance costs. Health and condition assessment coupled with online risk monitors can potentially enhance affordability of aSMRs through optimized operational planning and maintenance scheduling. Currently deployed risk monitors are an extension of probabilistic risk assessment (PRA). For complex engineered systems like nuclear power plants, PRA systematically combines event likelihoods and the probability of failure (POF) of key components, so that when combined with the magnitude of possible adversemore » consequences to determine risk. Traditional PRA uses population-based POF information to estimate the average plant risk over time. Currently, most nuclear power plants have a PRA that reflects the as-operated, as-modified plant; this model is updated periodically, typically once a year. Risk monitors expand on living PRA by incorporating changes in the day-by-day plant operation and configuration (e.g., changes in equipment availability, operating regime, environmental conditions). However, population-based POF (or population- and time-based POF) is still used to populate fault trees. Health monitoring techniques can be used to establish condition indicators and monitoring capabilities that indicate the component-specific POF at a desired point in time (or over a desired period), which can then be incorporated in the risk monitor to provide a more accurate estimate of the plant risk in different configurations. This is particularly important for active systems, structures, and components (SSCs) proposed for use in aSMR designs. These SSCs may differ significantly from those used in the operating fleet of light-water reactors (or even in LWR-based SMR designs). Additionally, the operating characteristics of aSMRs can present significantly different requirements, including the need to operate in different coolant environments, higher operating temperatures, and longer operating cycles between planned refueling and maintenance outages. These features, along with the relative lack of operating experience for some of the proposed advanced designs, may limit the ability to estimate event probability and component POF with a high degree of certainty. Incorporating real-time estimates of component POF may compensate for a relative lack of established knowledge about the long-term component behavior and improve operational and maintenance planning and optimization. The particular eccentricities of advanced reactors and small modular reactors provide unique challenges and needs for advanced instrumentation, control, and human-machine interface (ICHMI) techniques such as enhanced risk monitors (ERM) in aSMRs. Several features of aSMR designs increase the need for accurate characterization of the real-time risk during operation and maintenance activities. A number of technical gaps in realizing ERM exist, and these gaps are largely independent of the specific reactor technology. As a result, the development of a framework for ERM would enable greater situational awareness regardless of the specific class of reactor technology. A set of research tasks are identified in a preliminary research plan to enable the development, testing, and demonstration of such a framework. Although some aspects of aSMRs, such as specific operational characteristics, will vary and are not now completely defined, the proposed framework is expected to be relevant regardless of such uncertainty. The development of an ERM framework will provide one of the key technical developments necessary to ensure the economic viability of aSMRs.« less

  11. Modeling of endoluminal and interstitial ultrasound hyperthermia and thermal ablation: applications to device design, feedback control, and treatment planning

    PubMed Central

    Prakash, Punit; Salgaonkar, Vasant A.; Diederich, Chris J.

    2014-01-01

    Endoluminal and catheter-based ultrasound applicators are currently under development and are in clinical use for minimally invasive hyperthermia and thermal ablation of various tissue targets. Computational models play a critical role in in device design and optimization, assessment of therapeutic feasibility and safety, devising treatment monitoring and feedback control strategies, and performing patient-specific treatment planning with this technology. The critical aspects of theoretical modeling, applied specifically to endoluminal and interstitial ultrasound thermotherapy, are reviewed. Principles and practical techniques for modeling acoustic energy deposition, bioheat transfer, thermal tissue damage, and dynamic changes in the physical and physiological state of tissue are reviewed. The integration of these models and applications of simulation techniques in identification of device design parameters, development of real time feedback-control platforms, assessing the quality and safety of treatment delivery strategies, and optimization of inverse treatment plans are presented. PMID:23738697

  12. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less

  13. An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West

    USGS Publications Warehouse

    Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.

    2011-01-01

    Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.

  14. Process Mining Techniques for Analysing Patterns and Strategies in Students' Self-Regulated Learning

    ERIC Educational Resources Information Center

    Bannert, Maria; Reimann, Peter; Sonnenberg, Christoph

    2014-01-01

    Referring to current research on self-regulated learning, we analyse individual regulation in terms of a set of specific sequences of regulatory activities. Successful students perform regulatory activities such as analysing, planning, monitoring and evaluating cognitive and motivational aspects during learning not only with a higher frequency…

  15. ITEA Financial Report--Fiscal 2003

    ERIC Educational Resources Information Center

    Technology Teacher, 2004

    2004-01-01

    The figures in this report reflect the financial year, which ended on June 30, 2003. The balance shown is the result of specifically planned activities on behalf of the Board of Directors and the headquarters staff to balance the budget. The Board monitors the financial condition of the association and foundation on an ongoing basis through its…

  16. 2012 U. S. Marine Corps S&T Strategic Plan: Leading Edge Technology for the Marines of Tomorrow

    DTIC Science & Technology

    2012-01-01

    Marines in monitoring exercise intensity, frequency, duration, recovery, and/or specific physiological indicators of aerobic training to prevent over-or...29 Training and Education ........................................................................... 32...through Doctrine, Organization, Training , Materiel, Leadership and Education, Personnel, and Facilities (DOTMLPF) analysis to enable the Marine Corps to

  17. 78 FR 70248 - Approval and Promulgation of Implementation Plans; Commonwealth of the Northern Mariana Islands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... source baseline date (and trigger date) under the PSD program in CNMI for sulfur dioxide, PM 10 and... for new or modified major stationary sources (``New Source Review,'' or NSR), programs for monitoring... 1975, EPA modified part 52 by incorporating specific PSD disapprovals into the applicable subpart for...

  18. 78 FR 19125 - Approval and Disapproval and Promulgation of Air Quality Implementation Plans; Colorado; Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... apply. The State also added or modified the definitions of the following terms: continuous monitoring... approving specific definitions that were added or modified with the June 20, 2003 Common Provisions... reasons discussed in the notice of our proposed action, 76 FR 4268, EPA is disapproving the modified...

  19. 50 CFR 648.120 - Scup Annual Catch Limit (ACL).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 12 2013-10-01 2013-10-01 false Scup Annual Catch Limit (ACL). 648.120... Measures for the Scup Fishery § 648.120 Scup Annual Catch Limit (ACL). (a) The Scup Monitoring Committee... more specific ACL performance review criteria as part of a stock rebuilding plan following a...

  20. 50 CFR 648.120 - Scup Annual Catch Limit (ACL).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 12 2014-10-01 2014-10-01 false Scup Annual Catch Limit (ACL). 648.120... Measures for the Scup Fishery § 648.120 Scup Annual Catch Limit (ACL). (a) The Scup Monitoring Committee... more specific ACL performance review criteria as part of a stock rebuilding plan following a...

  1. 50 CFR 648.120 - Scup Annual Catch Limit (ACL).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Scup Annual Catch Limit (ACL). 648.120... Measures for the Scup Fishery § 648.120 Scup Annual Catch Limit (ACL). (a) The Scup Monitoring Committee... more specific ACL performance review criteria as part of a stock rebuilding plan following a...

  2. 40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring system...) Written procedures for continuous monitoring systems Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance evaluation Yes...

  3. Comparisons of Food and Drug Administration and European Medicines Agency risk management implementation for recent pharmaceutical approvals: report of the International Society for Pharmacoeconomics and outcomes research risk benefit management working group.

    PubMed

    Lis, Yvonne; Roberts, Melissa H; Kamble, Shital; J Guo, Jeff; Raisch, Dennis W

    2012-12-01

    1) To compare the Food and Drug Administration's (FDA's) Risk Evaluation and Mitigation Strategies (REMS) and European Medicines Agency's (EMA's) Risk Management Plan (RMP) guidances and 2) to compare REMS and RMPs for specific chemical entities and biological products. FDA, EMA, and pharmaceutical company Web sites were consulted for details pertaining to REMS and RMPs. REMS requirements include medication guides, communication plans, elements to ensure safe use, implementation systems, and specified assessment intervals. RMP requirements are increased pharmacovigilance and risk minimization activities. We compared these requirements for drugs requiring both REMS and RMPs. We identified 95 drugs on FDA's REMS list as of March 2010. Of these, there were 29 drugs (11 biologics and 18 new chemical entities) with EMA RMPs. REMS and RMPs are similar in objectives, with comparable toolkits. Both allow flexibility in product-specific actions, recognizing adverse effects of potential concern. Of the 29 drugs reviewed, REMS requirements not included in RMPs were patient medication guides (100% of the drugs), provider communication plans (38%), and routine monitoring of REMS (66%). RMP requirements not included in REMS were specific adverse event reporting (45% of the drugs), prospective registry studies (34%), prospective epidemiology studies (24%), additional trial data (28%), and Summary of Product Characteristics contraindications (76%). Both REMS and RMPs provide positive guidance for identification, monitoring, and minimization of risk to patient safety. Currently, neither agency provides specific guidance on how risk should be related to benefit either qualitatively or quantitatively. Copyright © 2012 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  4. TH-AB-202-09: Direct-Aperture Optimization for Combined MV+kV Dose Planning in Fluoroscopic Real-Time Tumor-Tracking Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, X; Belcher, AH; Grelewicz, Z

    Purpose: Real-time kV fluoroscopic tumor tracking has the benefit of direct tumor position monitoring. However, there is clinical concern over the excess kV imaging dose cost to the patient when imaging in continuous fluoroscopic mode. This work addresses this specific issue by proposing a combined MV+kV direct-aperture optimization (DAO) approach to integrate the kV imaging beam into a treatment planning such that the kV radiation is considered as a contributor to the overall dose delivery. Methods: The combined MV+kV DAO approach includes three algorithms. First, a projected Quasi-Newton algorithm (L-BFGS) is used to find optimized fluence with MV+kV dose formore » the best possible dose distribution. Then, Engel’s algorithm is applied to optimize the total number of monitor units and heuristically optimize the number of apertures. Finally, an aperture shape optimization (ASO) algorithm is applied to locally optimize the leaf positions of MLC. Results: Compared to conventional DAO MV plans with continuous kV fluoroscopic tracking, combined MV+kV DAO plan leads to a reduction in the total number of MV monitor units due to inclusion of kV dose as part of the PTV, and was also found to reduce the mean and maximum doses on the organs at risk (OAR). Compared to conventional DAO MV plan without kV tracking, the OAR dose in the combined MV+kV DAO plan was only slightly higher. DVH curves show that combined MV+kV DAO plan provided about the same PTV coverage as that in the conventional DAO plans without kV imaging. Conclusion: We report a combined MV+kV DAO approach that allows real time kV imager tumor tracking with only a trivial increasing on the OAR doses while providing the same coverage to PTV. The approach is suitable for clinic implementation.« less

  5. Incorporating genetic sampling in long-term monitoring and adaptive management in the San Diego County Management Strategic Plan Area, Southern California

    USGS Publications Warehouse

    Vandergast, Amy G.

    2017-06-02

    Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.

  6. Putting Adaptive Management into Monitoring: Retrospective and Prospective Views of Northwest Forest Plan Monitoring

    Treesearch

    David E. Busch; Jon R. Martin

    2006-01-01

    Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...

  7. Eating behaviors of older African Americans: an application of the theory of planned behavior.

    PubMed

    O'Neal, Catherine Walker; Wickrama, Kandauda K A S; Ralston, Penny A; Ilich, Jasminka Z; Harris, Cynthia M; Coccia, Catherine; Young-Clark, Iris; Lemacks, Jennifer

    2014-04-01

    The study applies the theory of planned behavior to explain the fruit and vegetable eating behaviors, a broad construct consisting of preparing, self-monitoring, and consuming fruits and vegetables, of older African Americans. Structural equation modeling was used to examine the applicability of the theory of planned behavior with data from 211 older African American women and men (73% women, 26% men; median age range of 57-63 years) participating in a larger intervention study. Attitudes about eating fruit and vegetables, subjective social norms, and perceived behavioral control were related to older African Americans' intentions to consume fruits and vegetables. Social norms and behavioral intentions were associated with fruit and vegetable eating behaviors. Perceived control did not moderate the influence of behavioral intentions on actual behavior. Results indicated that the theory of planned behavior can be used to explain variation in older African Americans' eating behavior. This study also emphasizes the value of considering broader behavioral domains when employing the theory of planned behavior rather than focusing on specific behaviors. Furthermore, social service programs aimed at reducing the incidence of diseases commonly associated with poor eating behaviors among older African Americans must consider promoting not only fruit and vegetable consumption but also related behaviors including preparing and self-monitoring by eliminating structural, cognitive, and normative constraints.

  8. Students' Progression in Monitoring Anomalous Results Obtained in Inquiry-Based Laboratory Tasks

    NASA Astrophysics Data System (ADS)

    Crujeiras-Pérez, Beatriz; Jiménez-Aleixandre, Maria Pilar

    2017-07-01

    This paper examines students' engagement in monitoring anomalous results across a 2-year longitudinal study with 9th and 10th graders (14-15 and 15-16 years of age). The context is a set of five inquiry-based laboratory tasks, requiring students to plan and carry out investigations. The study seeks to examine students' interpretation of data, in particular anomalous results generated by them during the process of solving the tasks, and their ability to monitor them. Data collected include video and audio recordings as well as students' written products. For the analysis, two rubrics were developed drawing on Chinn and Brewer (Cognition and Instruction, 19, 323-393, 2001) and Hmelo-Silver et al. (Science Education, 86, 219-243, 2002). The findings point to a pattern of progress in students' responses across the 2 years: (a) responses revealing a low capacity of monitoring due to not recognizing the data as anomalous or recognizing it as anomalous but being unable to explain their causes are more frequent in the first tasks and (b) responses revealing an improved capacity of monitoring are more frequent in the last tasks. The factors influencing students' regulation of their performances, as the requirement of planning, and specific scaffolding based on activity theory are discussed.

  9. A WebGIS platform for the monitoring of Farm Animal Genetic Resources (GENMON)

    PubMed Central

    Flury, Christine; Matasci, Giona; Joerin, Florent; Widmer, Ivo; Joost, Stéphane

    2017-01-01

    Background In 2007, the Food and Agriculture Organization of the United Nations (FAO) initiated the Global plan of action for Farm Animal Genetic Resources (FAnGR). The main goal of this plan is to reduce further loss of genetic diversity in farm animals, so as to protect and promote the diversity of farm animal resources. An important step to reach this goal is to monitor and prioritize endangered breeds in the context of conservation programs. Methodology/Web portal implementation The GENMON WebGIS platform is able to monitor FAnGR and to evaluate the degree of endangerment of livestock breeds. The system takes into account pedigree and introgression information, the geographical concentration of animals, the cryo-conservation plan and the sustainability of breeding activities based on socio-economic data as well as present and future land use conditions. A multi-criteria decision tool supports the aggregation of the multi-thematic indices mentioned above using the MACBETH method, which is based on a weighted average using satisfaction thresholds. GENMON is a monitoring tool to reach subjective decisions made by a government agency. It relies on open source software and is available at http://lasigsrv2.epfl.ch/genmon-ch. Results/Significance GENMON allows users to upload pedigree-information (animal ID, parents, birthdate, sex, location and introgression) from a specific livestock breed and to define species and/or region-specific weighting parameters and thresholds. The program then completes a pedigree analysis and derives several indices that are used to calculate an integrated score of conservation prioritization for the breeds under investigation. The score can be visualized on a geographic map and allows a fast, intuitive and regional identification of breeds in danger. Appropriate conservation actions and breeding programs can thus be undertaken in order to promote the recovery of the genetic diversity in livestock breeds in need. The use of the platform is illustrated by means of an example based on three local livestock breeds from different species in Switzerland. PMID:28453561

  10. A WebGIS platform for the monitoring of Farm Animal Genetic Resources (GENMON).

    PubMed

    Duruz, Solange; Flury, Christine; Matasci, Giona; Joerin, Florent; Widmer, Ivo; Joost, Stéphane

    2017-01-01

    In 2007, the Food and Agriculture Organization of the United Nations (FAO) initiated the Global plan of action for Farm Animal Genetic Resources (FAnGR). The main goal of this plan is to reduce further loss of genetic diversity in farm animals, so as to protect and promote the diversity of farm animal resources. An important step to reach this goal is to monitor and prioritize endangered breeds in the context of conservation programs. The GENMON WebGIS platform is able to monitor FAnGR and to evaluate the degree of endangerment of livestock breeds. The system takes into account pedigree and introgression information, the geographical concentration of animals, the cryo-conservation plan and the sustainability of breeding activities based on socio-economic data as well as present and future land use conditions. A multi-criteria decision tool supports the aggregation of the multi-thematic indices mentioned above using the MACBETH method, which is based on a weighted average using satisfaction thresholds. GENMON is a monitoring tool to reach subjective decisions made by a government agency. It relies on open source software and is available at http://lasigsrv2.epfl.ch/genmon-ch. GENMON allows users to upload pedigree-information (animal ID, parents, birthdate, sex, location and introgression) from a specific livestock breed and to define species and/or region-specific weighting parameters and thresholds. The program then completes a pedigree analysis and derives several indices that are used to calculate an integrated score of conservation prioritization for the breeds under investigation. The score can be visualized on a geographic map and allows a fast, intuitive and regional identification of breeds in danger. Appropriate conservation actions and breeding programs can thus be undertaken in order to promote the recovery of the genetic diversity in livestock breeds in need. The use of the platform is illustrated by means of an example based on three local livestock breeds from different species in Switzerland.

  11. 50 CFR 18.124 - How do I obtain a Letter of Authorization?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... polar bear or Pacific walrus in execution of those activities and you want nonlethal incidental take... Operation. (2) A site-specific plan to monitor the effects of the activity on the behavior of polar bear and... measures to minimize adverse effects on the availability of polar bear and Pacific walrus for subsistence...

  12. Wilderness stewardship challenges in the uKhahlamba Drakensberg Park World Heritage Site

    Treesearch

    Sonja Krüger

    2007-01-01

    The location of the uKhahlamba Drakensberg Park wilderness areas along an international border and within a World Heritage Site and Transfrontier Conservation Area, provides unique opportunities and challenges for the stewardship of these areas. Although the wilderness areas were proclaimed more than 30 years ago, wilderness-specific planning, management and monitoring...

  13. Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

  14. An assessment of PERT as a technique for schedule planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1982-01-01

    The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

  15. Region 7 States Air Quality Monitoring Plans - Iowa

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  16. Region 7 States Air Quality Monitoring Plans - Missouri

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  17. Region 7 States Air Quality Monitoring Plans - Nebraska

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  18. Region 7 States Air Quality Monitoring Plans - Kansas

    EPA Pesticide Factsheets

    National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo

  19. 50 CFR 216.175 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...

  20. U.S. Geological Survey quality-assurance plan for continuous water-quality monitoring in Kansas, 2014

    USGS Publications Warehouse

    Bennett, Trudy J.; Graham, Jennifer L.; Foster, Guy M.; Stone, Mandy L.; Juracek, Kyle E.; Rasmussen, Teresa J.; Putnam, James E.

    2014-01-01

    A quality-assurance plan for use in conducting continuous water-quality monitoring activities has been developed for the Kansas Water Science Center in accordance with guidelines set forth by the U.S. Geological Survey. This quality-assurance plan documents the standards, policies, and procedures used by the U.S. Geological Survey in Kansas for activities related to the collection, processing, storage, analysis, and release of continuous water-quality monitoring data. The policies and procedures that are documented in this quality-assurance plan for continuous water-quality monitoring activities complement quality-assurance plans for surface-water and groundwater activities in Kansas.

  1. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  2. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  3. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  4. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  5. 40 CFR Table 5 to Subpart IIIii of... - Required Elements of Floor-Level Mercury Vapor Measurement and Cell Room Monitoring Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...

  6. An Overview of the NASA Aviation Safety Program Propulsion Health Monitoring Element

    NASA Technical Reports Server (NTRS)

    Simon, Donald L.

    2000-01-01

    The NASA Aviation Safety Program (AvSP) has been initiated with aggressive goals to reduce the civil aviation accident rate, To meet these goals, several technology investment areas have been identified including a sub-element in propulsion health monitoring (PHM). Specific AvSP PHM objectives are to develop and validate propulsion system health monitoring technologies designed to prevent engine malfunctions from occurring in flight, and to mitigate detrimental effects in the event an in-flight malfunction does occur. A review of available propulsion system safety information was conducted to help prioritize PHM areas to focus on under the AvSP. It is noted that when a propulsion malfunction is involved in an aviation accident or incident, it is often a contributing factor rather than the sole cause for the event. Challenging aspects of the development and implementation of PHM technology such as cost, weight, robustness, and reliability are discussed. Specific technology plans are overviewed including vibration diagnostics, model-based controls and diagnostics, advanced instrumentation, and general aviation propulsion system health monitoring technology. Propulsion system health monitoring, in addition to engine design, inspection, maintenance, and pilot training and awareness, is intrinsic to enhancing aviation propulsion system safety.

  7. An Architecture for Autonomic Web Service Process Planning

    NASA Astrophysics Data System (ADS)

    Moore, Colm; Xue Wang, Ming; Pahl, Claus

    Web service composition is a technology that has received considerable attention in the last number of years. Languages and tools to aid in the process of creating composite Web services have been received specific attention. Web service composition is the process of linking single Web services together in order to accomplish more complex tasks. One area of Web service composition that has not received as much attention is the area of dynamic error handling and re-planning, enabling autonomic composition. Given a repository of service descriptions and a task to complete, it is possible for AI planners to automatically create a plan that will achieve this goal. If however a service in the plan is unavailable or erroneous the plan will fail. Motivated by this problem, this paper suggests autonomous re-planning as a means to overcome dynamic problems. Our solution involves automatically recovering from faults and creating a context-dependent alternate plan. We present an architecture that serves as a basis for the central activities autonomous composition, monitoring and fault handling.

  8. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...

  9. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... this part. (c)-(d) [Reserved] (e) Contents of the monitoring plan. Each monitoring plan shall contain..., rounded to the nearest 100 lb/hr); (J) Identification of all units using a common stack; (K) Activation...: (A) Program(s) for which the EDR is submitted; (B) Unit classification; (C) Reporting frequency; (D...

  10. Using community-based evidence for decentralized health planning: insights from Maharashtra, India.

    PubMed

    Shukla, Abhay; Khanna, Renu; Jadhav, Nitin

    2018-01-01

    Health planning is generally considered a technical subject, primarily the domain of health officials with minimal involvement of community representatives. The National Rural Health Mission launched in India in 2005 recognized this gap and mandated mechanisms for decentralized health planning. However, since planning develops in the context of highly unequal power relations, formal spaces for participation are necessary but not sufficient. Hence a project on capacity building for decentralized health planning was implemented in selected districts of Maharashtra, India during 2010-13. This process developed on the platform of officially supported community-based monitoring and planning, a process for community feedback and participation towards health system change. A specific project on capacity building for decentralized planning included a structured learning course and workshops for major stakeholders. An evaluation of the project, including in-depth interviews of various participants and analysis of change in local health planning processes, revealed positive changes in intervention areas, including increased capacity of key stakeholders leading to preparation of evidence-based, innovative planning proposals, significant community oriented changes in utilization of health facility funds, and inclusion of community-based proposals in village, health facility-based block and district plans. Transparency related to planning increased along with responsiveness of health providers to community suggestions. A key lesson is that active facilitation of decentralized health planning and influencing the health system to expand participation, are essential to ensure changes in planning. Effective strategies included: identifying people's health service related priorities through community-based monitoring, capacity building of diverse stakeholders regarding local health planning, and advocacy to enable participation of community-based actors in the planning process. This combination of strategies draws upon the framework of 'empowered participatory governance' which necessitates combining a degree of 'countervailing power' and acceptance of participation by the system, for new forms of governance to emerge. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.

  11. A brief intervention changing oral self-care, self-efficacy, and self-monitoring.

    PubMed

    Schwarzer, Ralf; Antoniuk, Agata; Gholami, Maryam

    2015-02-01

    The roles of self-efficacy and self-monitoring as proximal predictors of dental flossing frequency are studied in the context of an oral health intervention. A study among 287 university students, aged 19 to 26 years, compared an intervention group that received a brief self-regulatory treatment, with a passive and an active control group. Dental flossing, self-efficacy, and self-monitoring were assessed at baseline and 3 weeks later. The intervention led to an increase in dental flossing regardless of experimental condition. However, treatment-specific gains were documented for self-efficacy and self-monitoring. Moreover, changes in the latter two served as mediators in a path model, linking the intervention with subsequent dental flossing and yielding significant indirect effects. Self-efficacy and self-monitoring play a mediating role in facilitating dental flossing. Interventions that aim at an improvement in oral self-care should consider using these constructs. Statement of contribution What is already known on this subject? The adoption and maintenance of oral self-care can be facilitated by a number of social-cognitive variables. Interventions that include planning, action control, or self-efficacy components have been shown to improve dental flossing. In one recent study on flossing in adolescent girls, planning intervention effects were mediated by self-efficacy. What does this study add? Self-monitoring is associated with better oral self-care. A 10-min intervention improves self-efficacy and self-monitoring. Self-efficacy and self-monitoring operate as mediators between treatment and flossing. © 2014 The British Psychological Society.

  12. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  13. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  14. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  15. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  16. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  17. Confronting Challenges in Monitoring and Evaluation: Innovation in the Context of the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive.

    PubMed

    Radin, Anna K; Abutu, Andrew A; Okwero, Margaret A; Adler, Michelle R; Anyaike, Chukwuma; Asiimwe, Hilda T; Behumbiize, Prosper; Efuntoye, Timothy A; King, Rachel L; Kisaakye, Linda Nabitaka; Ogundehin, Dolapo T; Phelps, Benjamin Ryan; Watts, Heather; Weissglas, Fitti

    2017-05-01

    The Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), which was launched in 2011, set a series of ambitious targets, including a reduction of new HIV infections among children by 90% by 2015 (from a baseline year of 2009) and AIDS-related maternal mortality by 50% by 2015. To reach these targets, the Global Plan called for unprecedented investments in the prevention of mother-to-child transmission of HIV (PMTCT), innovative new approaches to service delivery, immense collective effort on the programmatic and policy fronts, and importantly, a renewed focus on data collection and use. We provide an overview of major achievements in monitoring and evaluation across Global Plan countries and highlight key challenges and innovative country-driven solutions using PMTCT program data. Specifically, we describe the following: (1) Uganda's development and use of a weekly reporting system for PMTCT using short message service technology that facilitates real-time monitoring and programmatic adjustments throughout the transition to a "treat all" approach for pregnant and breastfeeding women living with HIV (Option B+); (2) Uganda's work to eliminate parallel reporting systems while strengthening the national electronic district health information system; and (3) how routine PMTCT program data in Nigeria can be used to estimate HIV prevalence at the local level and address a critical gap in local descriptive epidemiologic data to better target limited resources. We also identify several ongoing challenges in data collection, analysis, and use, and we suggest potential solutions.

  18. Confronting Challenges in Monitoring & Evaluation: Innovation in the Context of the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive

    PubMed Central

    Radin, Anna K.; Abutu, Andrew A.; Okwero, Margaret Achom; Adler, Michelle R.; Anyaike, Chukwuma; Asiimwe, Hilda T.; Behumbiize, Prosper; Efuntoye, Timothy A.; King, Rachel L.; Kisaakye, Linda Nabitaka; Ogundehin, Dolapo T.; Phelps, Benjamin Ryan; Watts, D. Heather; Weissglas, Fitti

    2017-01-01

    The Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), which was launched in 2011, set a series of ambitious targets, including a reduction of new HIV infections among children by 90% by 2015 (from a baseline year of 2009) and AIDS-related maternal mortality by 50% by 2015.1 To reach these targets, the Global Plan called for unprecedented investments in the prevention of mother-to-child HIV transmission (PMTCT), innovative new approaches to service delivery, immense collective effort on the programmatic and policy fronts, and, importantly, a renewed focus on data collection and use. We provide an overview of major achievements in monitoring and evaluation across Global Plan countries and highlight key challenges and innovative country-driven solutions using PMTCT program data. Specifically, we describe the following: (1) Uganda’s development and use of a weekly reporting system for PMTCT using short message service (SMS) technology that facilitates real-time monitoring and programmatic adjustments throughout the transition to a “treat all” approach for pregnant and breastfeeding women living with HIV (Option B+); (2) Uganda’s work to eliminate parallel reporting systems while strengthening the national electronic district health information system; and (3) how routine PMTCT program data in Nigeria can be used to estimate HIV prevalence at the local level and address a critical gap in local descriptive epidemiologic data to better target limited resources. We also identify several ongoing challenges in data collection, analysis, and use, and we suggest potential solutions. PMID:28398999

  19. Is Collaborative Learners' Adoption of Metacognitive Regulation Related to Students' Content Processing Strategies and the Level of Transactivity in Their Peer Discussions?

    ERIC Educational Resources Information Center

    De Backer, Liesje; Van Keer, Hilde; Valcke, Martin

    2017-01-01

    The present study investigates collaborative learners' adoption of key regulation activities (i.e., orienting, planning, monitoring, and evaluating) and a deep-level regulation approach in relation to characteristics of their collaboration on the cognitive and communicative level. More specifically, the correlation of collaborative learners'…

  20. 77 FR 74421 - Approval and Promulgation of Air Quality Implementation Plans for PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... calculation of future year PM 2.5 design values using the SMAT assumptions contained in the modeled guidance\\4... components. Future PM 2.5 design values at specified monitoring sites were estimated by adding the future... nonattainment area, all future site-specific PM 2.5 design values were below the concentration specified in the...

  1. Defense Business Transformation: DOD Should Improve Its Planning with and Performance Monitoring of the Military Departments

    DTIC Science & Technology

    2016-12-01

    Departments Report to Congressional Addressees December 2016 GAO-17-9 United States Government Accountability Office United States...Government Accountability Office Highlights of GAO-17-9, a report to congressional addresses December 2016 DEFENSE BUSINESS TRANSFORMATION DOD Should...specific management responsibility, accountability , and control over business transformation efforts and applicable resources across its business

  2. Alberta Biodiversity Monitoring Program - monitoring effectiveness of sustainable forest management planning

    Treesearch

    J. John Stadt; Jim Schieck; Harry Stelfox

    2006-01-01

    The Alberta Biodiversity Monitoring Program is a rigorous science-based initiative that is being developed to monitor and report on biodiversity status and trends throughout the province of Alberta, Canada. Forest management plans in Alberta are required to monitor and report on the achievement of stated sustainable forest management objectives; however, the...

  3. Eating Behaviors of Older African Americans: An Application of the Theory of Planned Behavior

    PubMed Central

    O’Neal, Catherine Walker

    2014-01-01

    Purpose: The study applies the theory of planned behavior to explain the fruit and vegetable eating behaviors, a broad construct consisting of preparing, self-monitoring, and consuming fruits and vegetables, of older African Americans. Design and Methods: Structural equation modeling was used to examine the applicability of the theory of planned behavior with data from 211 older African American women and men (73% women, 26% men; median age range of 57–63 years) participating in a larger intervention study. Results: Attitudes about eating fruit and vegetables, subjective social norms, and perceived behavioral control were related to older African Americans’ intentions to consume fruits and vegetables. Social norms and behavioral intentions were associated with fruit and vegetable eating behaviors. Perceived control did not moderate the influence of behavioral intentions on actual behavior. Implications: Results indicated that the theory of planned behavior can be used to explain variation in older African Americans’ eating behavior. This study also emphasizes the value of considering broader behavioral domains when employing the theory of planned behavior rather than focusing on specific behaviors. Furthermore, social service programs aimed at reducing the incidence of diseases commonly associated with poor eating behaviors among older African Americans must consider promoting not only fruit and vegetable consumption but also related behaviors including preparing and self-monitoring by eliminating structural, cognitive, and normative constraints. PMID:23241919

  4. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  5. Patient-specific IMRT verification using independent fluence-based dose calculation software: experimental benchmarking and initial clinical experience.

    PubMed

    Georg, Dietmar; Stock, Markus; Kroupa, Bernhard; Olofsson, Jörgen; Nyholm, Tufve; Ahnesjö, Anders; Karlsson, Mikael

    2007-08-21

    Experimental methods are commonly used for patient-specific intensity-modulated radiotherapy (IMRT) verification. The purpose of this study was to investigate the accuracy and performance of independent dose calculation software (denoted as 'MUV' (monitor unit verification)) for patient-specific quality assurance (QA). 52 patients receiving step-and-shoot IMRT were considered. IMRT plans were recalculated by the treatment planning systems (TPS) in a dedicated QA phantom, in which an experimental 1D and 2D verification (0.3 cm(3) ionization chamber; films) was performed. Additionally, an independent dose calculation was performed. The fluence-based algorithm of MUV accounts for collimator transmission, rounded leaf ends, tongue-and-groove effect, backscatter to the monitor chamber and scatter from the flattening filter. The dose calculation utilizes a pencil beam model based on a beam quality index. DICOM RT files from patient plans, exported from the TPS, were directly used as patient-specific input data in MUV. For composite IMRT plans, average deviations in the high dose region between ionization chamber measurements and point dose calculations performed with the TPS and MUV were 1.6 +/- 1.2% and 0.5 +/- 1.1% (1 S.D.). The dose deviations between MUV and TPS slightly depended on the distance from the isocentre position. For individual intensity-modulated beams (total 367), an average deviation of 1.1 +/- 2.9% was determined between calculations performed with the TPS and with MUV, with maximum deviations up to 14%. However, absolute dose deviations were mostly less than 3 cGy. Based on the current results, we aim to apply a confidence limit of 3% (with respect to the prescribed dose) or 6 cGy for routine IMRT verification. For off-axis points at distances larger than 5 cm and for low dose regions, we consider 5% dose deviation or 10 cGy acceptable. The time needed for an independent calculation compares very favourably with the net time for an experimental approach. The physical effects modelled in the dose calculation software MUV allow accurate dose calculations in individual verification points. Independent calculations may be used to replace experimental dose verification once the IMRT programme is mature.

  6. A Planning Approach for Developing Inventory and Monitoring Programs In National Parks

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...

  7. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the...'s reports. Each sales or rental report shall be reviewed by the monitoring office as it is received. When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or...

  8. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  9. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  10. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  11. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  12. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  13. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  14. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  15. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options.

    PubMed

    Rani, Manju; Nusrat, Sharmin; Hawken, Laura H

    2012-10-16

    Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.

  16. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options

    PubMed Central

    2012-01-01

    Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232

  17. Challenges in Credentialing Institutions and Participants in Advanced Technology Multi-institutional Clinical Trials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ibbott, Geoffrey S.; Followill, David S.; Molineu, H. Andrea

    The Radiological Physics Center (RPC) has functioned continuously for 38 years to assure the National Cancer Institute and the cooperative groups that institutions participating in multi-institutional trials can be expected to deliver radiation treatments that are clinically comparable to those delivered by other institutions in the cooperative groups. To accomplish this, the RPC monitors the machine output, the dosimetry data used by the institutions, the calculation algorithms used for treatment planning, and the institutions' quality control procedures. The methods of monitoring include on-site dosimetry review by an RPC physicist and a variety of remote audit tools. The introduction of advancedmore » technology clinical trials has prompted several study groups to require participating institutions and personnel to become credentialed, to ensure their familiarity and capability with techniques such as three-dimensional conformal radiotherapy, intensity-modulated radiotherapy, stereotactic body radiotherapy, and brachytherapy. The RPC conducts a variety of credentialing activities, beginning with questionnaires to evaluate an institution's understanding of the protocol and their capabilities. Treatment-planning benchmarks are used to allow the institution to demonstrate their planning ability and to facilitate a review of the accuracy of treatment-planning systems under relevant conditions. The RPC also provides mailable anthropomorphic phantoms to verify tumor dose delivery for special treatment techniques. While conducting these reviews, the RPC has amassed a large amount of data describing the dosimetry at participating institutions. Representative data from the monitoring programs are discussed, and examples are presented of specific instances in which the RPC contributed to the discovery and resolution of dosimetry errors.« less

  18. Plan for the control of Legionella infections in long-term care facilities: role of environmental monitoring.

    PubMed

    Cristino, Sandra; Legnani, Pier Paolo; Leoni, Erica

    2012-04-01

    In accordance with the international and national guidelines, the Emilia-Romagna Region (Italy) has established regional guidelines for the surveillance and prevention of legionellosis based on the concept of risk assessment, with particular attention to environmental monitoring. The aim of this study was to verify how environmental surveillance in the context of risk assessment plans could help to guide decisions about preventive strategies against Legionella infections in Long Term Care Facilities (LTCF). In six LTCFs in the city of Bologna (Emilia-Romagna Region) a self-control plan was implemented that included the environmental monitoring of Legionella spp. and the surveillance of hospital-acquired Legionnaires' Disease. At baseline, four hot water systems were colonized by Legionella pneumophila (3 LCTFs) and Legionella londiniensis (1 LCTF). In each establishment specific control measures were adopted based on the characteristics of the system, the virulence of the strain and the level of the contamination. The monitoring, carried out for around two years, was also extended to the ways in which the system and the distal water distribution points were used and maintained with respect to the good practices in operation and management. The adopted actions (shock and/or continuous disinfection treatments) and the implementation of the good practice measures reduced the contamination to acceptable and stable levels. No cases of hospital-acquired legionellosis occurred during the period of study. The environmental surveillance was successful in evaluating the risk and identifying the most suitable preventive strategies. Copyright © 2011 Elsevier GmbH. All rights reserved.

  19. Water-quality assessment of south-central Texas: Occurrence and distribution of volatile organic compounds in surface water and ground water, 1983-94, and implications for future monitoring

    USGS Publications Warehouse

    Ging, P.B.; Judd, L.J.; Wynn, K.H.

    1997-01-01

    The study area of the South-Central Texas study unit of the National Water-Quality Assessment Program comprises the Edwards aquifer in the San Antonio region and its catchment area. The first phase of the assessment includes evaluation of existing water-quality data for surface water and ground water, including volatile organic compounds, to determine the scope of planned monitoring. Most analyses of volatile organic compounds in surface water are from the National Pollutant Discharge Elimination System sites in San Antonio, Texas. Nine volatile organic compounds were detected at the six sites. The three compounds with the most detections at National Pollutant Discharge Elimination System sites are 1,2,4-trimethylbenzene, toluene, and xylene. Analysis of volatile organic compounds in ground water was limited to Edwards aquifer wells. Twenty-eight volatile organic compounds were detected in samples from 89 wells. The five most commonly detected compounds in samples from wells, in descending order, are tetrachloroethene, trichloroethene, bromoform, chloroform, and dibromochloromethane. Detections of volatile organic compounds in surface water and ground water within the South-Central Texas study area are limited to site-specific sources associated with development; therefore, planned monitoring for possible detections of volatile organic compounds as part of the National Water-Quality Assessment Program will emphasize areas of expanding population and development. Monitoring of volatile organic compounds is planned at National Pollutant Discharge Elimination System sites, at basic fixed surface-water sites, and in the ground-water study-unit surveys.

  20. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 1, Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Aerial Measurement Systems

    2012-07-31

    The Monitoring division is primarily responsible for the coordination and direction of: Aerial measurements to delineate the footprint of radioactive contaminants that have been released into the environment. Monitoring of radiation levels in the environment; Sampling to determine the extent of contaminant deposition in soil, water, air and on vegetation; Preliminary field analyses to quantify soil concentrations or depositions; and Environmental and personal dosimetry for FRMAC field personnel, during a Consequence Management Response Team (CMRT) and Federal Radiological Monitoring and Assessment Center (FRMAC) response. Monitoring and sampling techniques used during CM/FRMAC operations are specifically selected for use during radiological emergenciesmore » where large numbers of measurements and samples must be acquired, analyzed, and interpreted in the shortest amount of time possible. In addition, techniques and procedures are flexible so that they can be used during a variety of different scenarios; e.g., accidents involving releases from nuclear reactors, contamination by nuclear waste, nuclear weapon accidents, space vehicle reentries, or contamination from a radiological dispersal device. The Monitoring division also provides technicians to support specific Health and Safety Division activities including: The operation of the Hotline; FRMAC facility surveys; Assistance with Health and Safety at Check Points; and Assistance at population assembly areas which require support from the FRMAC. This volume covers deployment activities, initial FRMAC activities, development and implementation of the monitoring and assessment plan, the briefing of field teams, and the transfer of FRMAC to the EPA.« less

  1. Actionable Science in the Gulf of Mexico: Connecting Researchers and Resource Managers

    NASA Astrophysics Data System (ADS)

    Lartigue, J.; Parker, F.; Allee, R.; Young, C.

    2017-12-01

    The National Oceanic and Atmospheric Administration (NOAA) RESTORE Science Program was established in the wake of the Deepwater Horizon oil spill to to carry out research, observation, and monitoring to support the long-term sustainability of the Gulf of Mexico ecosystem, including its fisheries. Administered in partnership with the US Fish and Wildlife Service, the Science Program emphasizes a connection between science and decision-making. This emphasis translated into an engagement process that allowed for resource managers and other users of information about the ecosystem to provide direct input into the science plan for the program. In developing funding opportunities, the Science Program uses structured conversations with resource managers and other decision makers to focus competitions on specific end user needs. When evaluating proposals for funding, the Science Program uses criteria that focus on applicability of a project's findings and products, end user involvement in project planning, and the approach for transferring findings and products to the end user. By including resource managers alongside scientific experts on its review panels, the Science Program ensures that these criteria are assessed from both the researcher and end user perspectives. Once funding decisions are made, the Science Program assigns a technical monitor to each award to assist with identifying and engaging end users. Sharing of best practices among the technical monitors has provided the Science Program insight on how best to bridge the gap between research and resource management and how to build successful scientist-decision maker partnerships. During the presentation, we will share two case studies: 1) design of a cooperative (fisheries scientist, fisheries managers, and fishers), Gulf-wide conservation and monitoring program for fish spawning aggregations and 2) development of habitat-specific ecosystem indicators for use by federal and state resource managers.

  2. 40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to develop SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring... to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance...)(iv), (b)(2)(v) Actions taken to minimize emissions during SSM No. § 63.10(b)(2)(vi) Recordkeeping for...

  3. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Treesearch

    Jonathan Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  4. [New professional field in France: Analysis of the training needs of case managers].

    PubMed

    Somme, Dominique; Corvol, Aline; Couturier, Yves; Pimouguet, Clément; Moreau, Olivier; Perivier, Samuel; Balard, Frédéric; de Stampa, Matthieu

    2015-01-01

    Case management is a relatively new career field in France. It was first introduced on an experimental basis in 2007-2008, and was then developedfollowing the National Alzheimer Plan and finally enshrined in legislation in 2012. This careerfield is based on a set of tasks widely described internationally: identifying the right level of intervention, standardized multidimensional assessment, planning all aid (care and social services), implementation of the plan, monitoring and reassessment and periodic reassessment of all needs in a continuous and long-term process. The specific, systematic and dedicated nature of these tasks to these tasks makes training essential. Regulations also stipulate that the professional must acquire additional training by a dedicated inter-university degree. This requirement is a French specificity The authors present the history of case management and training in France and analyze the various international training frameworks identified by an Internet search. Moreover, based on the opinions expressed by case managers at different times of the scientific assessment and a review ofseveral studies conducted by inter-university case management program students, this article highlights the specific training needs of case managers and how the proposed training can meet these needs.

  5. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  6. Preparation of regional shorebird monitoring plans

    Treesearch

    Jonathan Bart; Ann Manning; Susan Thomas; Catherine Wightman

    2005-01-01

    Shorebird monitoring programs in Canada and the United States are being developed under the auspices of PRISM, the Program for Regional and International Shorebird Monitoring. PRISM provides a single blueprint for implementing the monitoring proposals in the shorebird conservation plans prepared recently in Canada and the United States. It includes four segments:...

  7. Designing monitoring programs in an adaptive management context for regional multiple species conservation plans

    USGS Publications Warehouse

    Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.

    2004-01-01

    critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.

  8. The Coordination of Program Planning and Evaluation Systems for Occupational Education. Volume 1 Appendix: A Layman's Guide to the Reporting and Evaluation System for Occupational Education.

    ERIC Educational Resources Information Center

    Pargament, Richard

    The manuscript is a draft written in nontechnical terms, for the purpose of acquainting local and regional occupational administrators with RESOE's functional specifications and basic design concepts. Following a brief introduction is a description of what RESOE does, covering: evaluation of occupational programs; program monitoring and…

  9. Operations management: a tool to increase profitability.

    PubMed

    Mulvehill, M J

    2001-03-01

    Operations management enables the efficient utilization of the production systems in a business. This paper will address several key elements in the business competency of operations management. Specifically, this discussion will review the components of a material requirement planning system and a "just-in-time" system for inventory control and time management to enable the dentist to monitor a portion of the practice's overhead costs.

  10. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  11. 40 CFR 63.2987 - What must my operation, maintenance, and monitoring (OMM) plan include?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintenance, and monitoring (OMM) plan include? (a) You must prescribe the monitoring that will be performed...) For the burn cycle that follows the inspection, document that the thermal oxidizer is operating...

  12. Study protocol for evaluating the implementation and effectiveness of an emergency department longitudinal patient monitoring system using a mixed-methods approach.

    PubMed

    Ward, Marie; McAuliffe, Eilish; Wakai, Abel; Geary, Una; Browne, John; Deasy, Conor; Schull, Michael; Boland, Fiona; McDaid, Fiona; Coughlan, Eoin; O'Sullivan, Ronan

    2017-01-23

    Early detection of patient deterioration is a key element of patient safety as it allows timely clinical intervention and potential rescue, thus reducing the risks of serious patient safety incidents. Longitudinal patient monitoring systems have been widely recommended for use to detect clinical deterioration. However, there is conflicting evidence on whether they improve patient outcomes. This may in part be related to variation in the rigour with which they are implemented and evaluated. This study aims to evaluate the implementation and effectiveness of a longitudinal patient monitoring system designed for adult patients in the unique environment of the Emergency Department (ED). A novel participatory action research (PAR) approach is taken where socio-technical systems (STS) theory and analysis informs the implementation through the improvement methodology of 'Plan Do Study Act' (PDSA) cycles. We hypothesise that conducting an STS analysis of the ED before beginning the PDSA cycles will provide for a much richer understanding of the current situation and possible challenges to implementing the ED-specific longitudinal patient monitoring system. This methodology will enable both a process and an outcome evaluation of implementing the ED-specific longitudinal patient monitoring system. Process evaluations can help distinguish between interventions that have inherent faults and those that are badly executed. Over 1.2 million patients attend EDs annually in Ireland; the successful implementation of an ED-specific longitudinal patient monitoring system has the potential to affect the care of a significant number of such patients. To the best of our knowledge, this is the first study combining PAR, STS and multiple PDSA cycles to evaluate the implementation of an ED-specific longitudinal patient monitoring system and to determine (through process and outcome evaluation) whether this system can significantly improve patient outcomes by early detection and appropriate intervention for patients at risk of clinical deterioration.

  13. An introduction to the Emergency Department Adult Clinical Escalation protocol: ED-ACE.

    PubMed

    Coughlan, Eoin; Geary, Una; Wakai, Abel; O'Sullivan, Ronan; Browne, John; McAuliffe, Eilish; Ward, Marie; McDaid, Fiona; Deasy, Conor

    2017-09-01

    This study demonstrates how a participatory action research approach was used to address the challenge of the early and effective detection of the deteriorating patient in the ED setting. The approach enabled a systematic approach to patient monitoring and escalation of care to be developed to address the wide-ranging spectrum of undifferentiated presentations and the phases of ED care from triage to patient admission. This paper presents a longitudinal patient monitoring system, which aims to provide monitoring and escalation of care, where necessary, of adult patients from triage to admission to hospital in a manner that is feasible in the unique ED environment. An action research approach was taken to designing a longitudinal patient monitoring system appropriate for the ED. While the first draft protocol for post-triage monitoring and escalation was designed by a core research group, six clinical sites were included in iterative cycles of planning, action, reviewing and further planning. Reasons for refining the system at each site were collated and the protocol was adjusted accordingly before commencing the process at the next site. The ED Adult Clinical Escalation longitudinal patient monitoring system (ED-ACE) evolved through iterative cycles of design and testing to include: (1) a monitoring chart for adult patients; (2) a standardised approach to the monitoring and reassessment of patients after triage until they are assessed by a clinician; (3) the ISBAR (I=Identify, S=Situation, B=Background, A=Assessment, R=Recommendation) tool for interprofessional communication relating to clinical escalation; (4) a template for prescribing a patient-specific monitoring plan to be used by treating clinicians to guide patient monitoring from the time the patient is assessed until when they leave the ED and (5) a protocol for clinical escalation prompted by single physiological triggers and clinical concern. This tool offers a link in the 'Chain of Prevention' between the Manchester Triage System and ward-based early warning scores taking account of the importance of standardisation, while being sufficiently adaptable for the unique working environment and patient population in the ED. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  14. Circumpolar biodiversity monitoring program (CBMP): Coastal expert workshop meeting report

    USGS Publications Warehouse

    Anderson, Rebecca D.; McLennan, Donald; Thomson, Laura; Wegeberg, Susse; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, Stacey; Christensen, Thomas K.; Price, Courtney

    2016-01-01

    The Coastal Expert Workshop, which took place in Ottawa, Canada from March 1 to 3, 2016, initiated the development of the Arctic Coastal Biodiversity Monitoring Plan (Coastal Plan). Meeting participants, including northern residents, representatives from industry, non-governmental organisations (NGOs), academia, and government regulators and agencies from across the circumpolar Arctic, discussed current biodiversity monitoring efforts, key issues facing biodiversity in Arctic coastal areas, and collectively identified monitoring indicators, or Focal Ecosystem Components (FECs). On February 29, the day before the workshop, a full day was allocated to Traditional Knowledge (TK) holders to meet and elucidate how this important knowledge can be included in the process of building the Coastal Plan and monitoring biodiversity in Arctic coastal areas, along with scientific data and variables. This document provides 1) background information about the Circumpolar Biodiversity Monitoring Programme and the Coastal Expert Monitoring Group, 2) overviews on workshop presentations and breakout sessions, and 3) details regarding outcomes of the workshop that will inform the drafting of the Coastal Plan.

  15. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less

  16. Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper

    USGS Publications Warehouse

    McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.

    2016-01-01

    In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.

  17. The GMES Sentinel-5 mission for operational atmospheric monitoring: status and developments

    NASA Astrophysics Data System (ADS)

    Sierk, Bernd; Bezy, Jean-Loup; Caron, Jerôme; Meynard, Roland; Veihelmann, Ben; Ingmann, Paul

    2017-11-01

    Sentinel-5 is an atmospheric monitoring mission planned in the frame of the joint EU/ESA initiative Global Monitoring for Environment and Security (GMES). The objective of the mission, planned to be launched in 2020, is the operational monitoring of trace gas concentrations for atmospheric chemistry and climate applications.

  18. Chapter 3. Planning and design for habitat monitoring

    Treesearch

    Christina D. Vojta; Lyman L. McDonald; C. Kenneth Brewer; Kevin S. McKelvey; Mary M Rowland; Michael I. Goldstein

    2013-01-01

    This chapter provides guidance for designing a habitat monitoring program so that it will meet the monitoring objective, will be repeatable, and will adequately represent habitat within the spatial extent of interest. Although a number of excellent resources are available for planning and designing a monitoring program for wildlife populations (e.g., Busch and Trexler...

  19. L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2009-09-29

    Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimummore » number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.« less

  20. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less

  2. 40 CFR 60.4355 - How do I establish and document a proper parameter monitoring plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards of Performance for Stationary Combustion Turbines Monitoring § 60.4355 How do I establish and document a proper parameter monitoring plan? (a) The steam or water to fuel ratio or other parameters that...

  3. A Forest Fire Sensor Web Concept with UAVSAR

    NASA Astrophysics Data System (ADS)

    Lou, Y.; Chien, S.; Clark, D.; Doubleday, J.; Muellerschoen, R.; Zheng, Y.

    2008-12-01

    We developed a forest fire sensor web concept with a UAVSAR-based smart sensor and onboard automated response capability that will allow us to monitor fire progression based on coarse initial information provided by an external source. This autonomous disturbance detection and monitoring system combines the unique capabilities of imaging radar with high throughput onboard processing technology and onboard automated response capability based on specific science algorithms. In this forest fire sensor web scenario, a fire is initially located by MODIS/RapidFire or a ground-based fire observer. This information is transmitted to the UAVSAR onboard automated response system (CASPER). CASPER generates a flight plan to cover the alerted fire area and executes the flight plan. The onboard processor generates the fuel load map from raw radar data, used with wind and elevation information, predicts the likely fire progression. CASPER then autonomously alters the flight plan to track the fire progression, providing this information to the fire fighting team on the ground. We can also relay the precise fire location to other remote sensing assets with autonomous response capability such as Earth Observation-1 (EO-1)'s hyper-spectral imager to acquire the fire data.

  4. Integration of research advances in modelling and monitoring in support of WFD river basin management planning in the context of climate change.

    PubMed

    Quevauviller, Philippe; Barceló, Damia; Beniston, Martin; Djordjevic, Slobodan; Harding, Richard J; Iglesias, Ana; Ludwig, Ralf; Navarra, Antonio; Navarro Ortega, Alícia; Mark, Ole; Roson, Roberto; Sempere, Daniel; Stoffel, Markus; van Lanen, Henny A J; Werner, Micha

    2012-12-01

    The integration of scientific knowledge about possible climate change impacts on water resources has a direct implication on the way water policies are being implemented and evolving. This is particularly true regarding various technical steps embedded into the EU Water Framework Directive river basin management planning, such as risk characterisation, monitoring, design and implementation of action programmes and evaluation of the "good status" objective achievements (in 2015). The need to incorporate climate change considerations into the implementation of EU water policy is currently discussed with a wide range of experts and stakeholders at EU level. Research trends are also on-going, striving to support policy developments and examining how scientific findings and recommendations could be best taken on board by policy-makers and water managers within the forthcoming years. This paper provides a snapshot of policy discussions about climate change in the context of the WFD river basin management planning and specific advancements of related EU-funded research projects. Perspectives for strengthening links among the scientific and policy-making communities in this area are also highlighted. Copyright © 2012 Elsevier B.V. All rights reserved.

  5. Detector-specific correction factors in radiosurgery beams and their impact on dose distribution calculations.

    PubMed

    García-Garduño, Olivia A; Rodríguez-Ávila, Manuel A; Lárraga-Gutiérrez, José M

    2018-01-01

    Silicon-diode-based detectors are commonly used for the dosimetry of small radiotherapy beams due to their relatively small volumes and high sensitivity to ionizing radiation. Nevertheless, silicon-diode-based detectors tend to over-respond in small fields because of their high density relative to water. For that reason, detector-specific beam correction factors ([Formula: see text]) have been recommended not only to correct the total scatter factors but also to correct the tissue maximum and off-axis ratios. However, the application of [Formula: see text] to in-depth and off-axis locations has not been studied. The goal of this work is to address the impact of the correction factors on the calculated dose distribution in static non-conventional photon beams (specifically, in stereotactic radiosurgery with circular collimators). To achieve this goal, the total scatter factors, tissue maximum, and off-axis ratios were measured with a stereotactic field diode for 4.0-, 10.0-, and 20.0-mm circular collimators. The irradiation was performed with a Novalis® linear accelerator using a 6-MV photon beam. The detector-specific correction factors were calculated and applied to the experimental dosimetry data for in-depth and off-axis locations. The corrected and uncorrected dosimetry data were used to commission a treatment planning system for radiosurgery planning. Various plans were calculated with simulated lesions using the uncorrected and corrected dosimetry. The resulting dose calculations were compared using the gamma index test with several criteria. The results of this work presented important conclusions for the use of detector-specific beam correction factors ([Formula: see text] in a treatment planning system. The use of [Formula: see text] for total scatter factors has an important impact on monitor unit calculation. On the contrary, the use of [Formula: see text] for tissue-maximum and off-axis ratios has not an important impact on the dose distribution calculation by the treatment planning system. This conclusion is only valid for the combination of treatment planning system, detector, and correction factors used in this work; however, this technique can be applied to other treatment planning systems, detectors, and correction factors.

  6. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  7. Birds in Hawai'i Volcanoes National Park: Summary of the 2010 inventory and monitoring program survey

    USGS Publications Warehouse

    Camp, Richard J.; Judge, Seth W.; Hart, Patrick J.; Kudray, Greg; Gaudioso, Jacqueline M.; Hsu, Bobby H.

    2012-01-01

    The National Park Service (NPS) created the Inventory and Monitoring (I&M) Program in 1998 to establish baseline information and assess long-term trends in "vital signs" or key abiotic and biotic elements of National Parks (Fancy et al. 2009). The Pacific Island Network of the I&M Program developed a Landbirds Monitoring Protocol (LMP; Camp et al. 2011) to estimate species-specific status and monitor longterm trends in landbird distribution and abundance. Parks included in the LMP that harbor habitat critically important to native forest birds are Haleakala National Park (Maui Island), Hawai'i Volcanoes National Park (HAVO; Hawai'i Island), and the National Park of American Samoa (American Samoa). In 2010, the LMP was implemented in HAVO to survey landbird density and abundance. This implementation was the first anywhere in the Pacific Islands by the I&M Program, and continued monitoring is planned every five years in all three parks.

  8. Late-successional forests and northern spotted owls: how effective is the Northwest Forest Plan?

    Treesearch

    Miles Hemstrom; Martin G. Raphael

    2000-01-01

    This paper describes the late-successional and old-growth forest and the northern spotted owl effectiveness monitoring plans for the Northwest Forest Plan. The effectiveness monitoring plan for late-successional and old-growth forests will track changes in forest spatial distribution, and within-stand structure and composition, and it will predict future trends.

  9. Learning from conservation planning for the U.S. National Wildlife Refuges.

    PubMed

    Meretsky, Vicky J; Fischman, Robert L

    2014-10-01

    The U.S. National Wildlife Refuge System has nearly completed its first round of unit-level, comprehensive conservation plans (CCPs) and will soon begin required revisions. Laws and policies governing refuge planning emphasize ecological integrity, landscape-scale conservation, and adaptive management. We evaluated 185 CCPs completed during 2005-2011, which cover 324 of 555 national wildlife refuges. We reviewed CCP prescriptions addressing 5 common conservation issues (habitat and game, nongame, imperiled, and invasive species) and 3 specialized topics (landscape-scale conservation, climate change, and environmental quality). Common conservation issues received prescriptions in >90% of CCPs. Specialized topics received more variable treatment. Prescriptions for aquatic connectivity, water quantity, and climate-change impacts increased over the study period. Except for climate change, direct actions were the most common type of management prescription, followed by plans or studies. Most CCPs stated a commitment to adaptive management and prescribed monitoring for common conservation objectives; other aspects of planning for adaptive management were often lacking, despite strong support for adaptive management in the conservation planning literature. To better address refuge-specific threats, we recommend that revised plans explicitly match identified refuge issues with prescriptions, particularly for under-represented concerns such as novel pests and pathogens. We recommend incorporating triggers into monitoring frameworks and specifying actions that will occur when threshold values are reached to improve support for adaptive management. Revised CCPs should better reflect work that refuges already undertake to extend conservation objectives beyond their borders and better engage with regional conservation efforts to continue this work. More thorough landscape-scale threat assessments and explicit prioritization of planned actions would further improve conservation effectiveness. Excellent examples of all recommended practices exist within the CCPs we examined; sharing best planning practices would improve planning efficiency within the refuge system. © 2014 The Authors. Conservation Biology published by Wiley Periodicals, Inc., on behalf of the Society for Conservation Biology.

  10. 78 FR 13712 - U.S. Nuclear Regulatory Commission Planned Monitoring Activities for F-Area Tank Farm at the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Monitoring Activities for F-Area Tank Farm at the Savannah River Site, Revision 0 AGENCY: Nuclear Regulatory... carrying out its responsibilities for monitoring DOE's waste disposal activities at the F-Area Tank Farm at... the availability of ``U.S. Nuclear Regulatory Commission Plan for Monitoring Disposal Actions Taken by...

  11. Strategic Plan for the Spanish Academy of Dermatology and Venerology (AEDV): FuturAEDV 2013-2017.

    PubMed

    Ribera Pibernat, M; Moreno Jiménez, J C; Valcuende Cavero, F; Soto de Delás, J; Vázquez Veiga, H; Lázaro Ochaíta, P; Giménez Arnau, A

    2014-09-01

    The Spanish Academy of Dermatology and Venereology (AEDV) has decided that a Strategic Plan is needed to help the association adapt to new circumstances and anticipate future developments. 1) To position the AEDV as a medical association that can exert an influence in everything related to dermatology. 2) To contribute to the development of the specialty, strengthening the prestige and reputation of dermatology and dermatologists. 3) To establish a model for operating and strategic thinking that can be handed on to successive Boards of Directors and will enable the Academy to identify future challenges. The approach used to develop the Strategic Plan was as follows: analysis of trends in the health care system; assessment of the current situation of AEDV and of dermatology in general through an internal analysis based on surveys and interviews with academics; analysis of strengths, weaknesses, opportunities, and threats; preparation of a mission statement; and identification, development, and implementation of a strategy map prioritizing strategic lines of action. The strategy map set out 16 general goals grouped into 4 main topics (achieving the vision, internal and external customers, internal processes, and innovation) and detailed in an action plan with 19 initiatives, each with specific actions. The plan will be monitored by the Strategic Plan Monitoring Committee, which is made up of the members of the Standing Committee and the chairs of the 9 Technical Committees responsible for implementing the initiatives. The Functional Plan should guide the management of AEDV until 2017, and its implementation will enable the association to contribute to the development and prestige of the specialty and position itself as a reference in terms of its functional model. Copyright © 2014 Elsevier España, S.L.U. y AEDV. All rights reserved.

  12. Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000

    DTIC Science & Technology

    2001-04-01

    Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1

  13. The Self-Identified Skills and Competencies of First-Line Nurse Managers

    DTIC Science & Technology

    1992-06-01

    teaching, with the exception of evaluation of patient education classes and materials. 17 Human Resources Development. 1) selection. with the exception of...specifically being able to evaluate patient education classes and materials; and 2) evaluating results, by being able to monitor the quality of care...for patient education materials and classes to be used on the unit. 2. Evaluate patient and family teaching including discharge planning. 3. Evaluate

  14. Deriving a Campaign Plan for the Global Commons

    DTIC Science & Technology

    2011-08-13

    insisted on the carriage of government observers on board tourist vessels entering the Ross Sea region, ostensibly to monitor tourist behavior in World...capability to exert control or enforce a sovereignty claim. However claims to the global commons and their governing regimes are not immutable. On the...characteristics such domains share: (1) each are governed by international treaties; (2) these treaties address specific permissible uses and prohibitions; (3

  15. Coordinating across scales: Building a regional marsh bird monitoring program from national and state Initiatives

    USGS Publications Warehouse

    Shriver, G.W.; Sauer, J.R.

    2008-01-01

    Salt marsh breeding bird populations (rails, bitterns, sparrows, etc.) in eastern North America are high conservation priorities in need of site specific and regional monitoring designed to detect population changes over time. The present status and trends of these species are unknown but anecdotal evidence of declines in many of the species has raised conservation concerns. Most of these species are listed as conservation priorities on comprehensive wildlife plans throughout the eastern U.S. National Wildlife Refuges, National Park Service units, and other wildlife conservation areas provide important salt marsh habitat. To meet management needs for these areas, and to assist regional conservation planning, survey designs are being developed to estimate abundance and population trends for these breeding bird species. The primary purpose of this project is to develop a hierarchical sampling frame for salt marsh birds in Bird Conservation Region (BCR) 30 that will provide the ability to estimate species population abundances on 1) specific sites (i.e. National Parks and National Wildlife Refuges), 2) within states or regions, and 3) within BCR 30. The entire breeding range of Saltmarsh Sharp-tailed and Coastal Plain Swamp sparrows are within BCR 30, providing an opportunity to detect population trends within the entire breeding ranges of two priority species.

  16. Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface Water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-10-01

    The Y-12 Plant conducts a surface water monitoring program in response to DOE Orders and state of Tennessee requirements under the National Pollutant Discharge Elimination System (NPDES). The anticipated codification of DOE Order 5400.5 for radiation protection of the public and the environment (10 CFR Part 834) will require an environmental radiation protection plan (ERPP). The NPDES permit issued by the state of Tennessee requires a radiological monitoring plan (RMP) for Y-12 Plant surface waters. In a May 4, 1995 memo, the state of Tennessee, Division of Water Pollution Control, stated their desired needs and goals regarding the content ofmore » RMPs, associated documentation, and data resulting from the RMPs required under the NPDES permitting system (L. Bunting, General Discussion, Radiological Monitoring Plans, Tennessee Division of Water Pollution Control, May 4,1995). Appendix A provides an overview of how the Y-12 Plant will begin to address these needs and goals. It provides a more complete, documented basis for the current Y-12 Plant surface water monitoring program and is intended to supplement documentation provided in the Annual Site Environmental Reports (ASERs), NPDES reports, Groundwater Quality Assessment Reports, and studies conducted under the Y-12 Plant Environmental Restoration (ER) Program. The purpose of this update to the Y-12 Plant RMP is to satisfy the requirements of the current NPDES permit, DOE Order 5400.5, and 10 CFR Part 834, as current proposed, by defining the radiological monitoring plan for surface water for the Y-12 Plant. This plan includes initial storm water monitoring and data analysis. Related activities such as sanitary sewer and sediment monitoring are also summarized. The plan discusses monitoring goals necessary to determine background concentrations of radionuclides, to quantify releases, determine trends, satisfy regulatory requirements, support consequence assessments, and meet requirements that releases be ``as low as reasonably achievable`` (ALARA).« less

  17. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  18. Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan

    DTIC Science & Technology

    1993-10-01

    5 Table 4-2. US EPA Drinking Water MCLs ........................................ 4-6 Table 5-1. Sample Bottle Requirements, Preservation, and Holding... drinking water . " The types of quality control samples that will be collected during the Canal Creek groundwater monitoring program. ]- Jacobs...Revision No.: 0 Date: 10/27/93 Page: 6 of 9 Canal Creek Area, APG-EA, Maryland Groundwater Monitoring Plan, VOLUME I1 Table 4-2. US EPA Drinking Water

  19. [Technological innovations in radiation oncology require specific quality controls].

    PubMed

    Lenaerts, E; Mathot, M

    2014-01-01

    During the last decade, the field of radiotherapy has benefited from major technological innovations and continuously improving treatment efficacy, comfort and safety of patients. This mainly concerns the imaging techniques that allow 4D CT scan recording the respiratory phases, on-board imaging on linear accelerators that ensure perfect positioning of the patient for treatment and irradiation techniques that reduce very significantly the duration of treatment sessions without compromising quality of the treatment plan, including IMRT (Intensity Modulated Radiation Therapy) and VMAT (Volumetric Modulated Arc therapy). In this context of rapid technological change, it is the responsibility of medical physicists to regularly and precisely monitor the perfect functioning of new techniques to ensure patient safety. This requires the use of specific quality control equipment best suited to these new techniques. We will briefly describe the measurement system Delta4 used to control individualized treatment plan for each patient treated with VMAT technology.

  20. Temperature - Emissivity Separation Assessment in a Sub-Urban Scenario

    NASA Astrophysics Data System (ADS)

    Moscadelli, M.; Diani, M.; Corsini, G.

    2017-10-01

    In this paper, a methodology that aims at evaluating the effectiveness of different TES strategies is presented. The methodology takes into account the specific material of interest in the monitored scenario, sensor characteristics, and errors in the atmospheric compensation step. The methodology is proposed in order to predict and analyse algorithms performances during the planning of a remote sensing mission, aimed to discover specific materials of interest in the monitored scenario. As case study, the proposed methodology is applied to a real airborne data set of a suburban scenario. In order to perform the TES problem, three state-of-the-art algorithms, and a recently proposed one, are investigated: Temperature-Emissivity Separation '98 (TES-98) algorithm, Stepwise Refining TES (SRTES) algorithm, Linear piecewise TES (LTES) algorithm, and Optimized Smoothing TES (OSTES) algorithm. At the end, the accuracy obtained with real data, and the ones predicted by means of the proposed methodology are compared and discussed.

  1. Health authority commissioning for quality in contraception services

    PubMed Central

    Newman, M.; Bardsley, M.; Morgan, D.; Jacobson, B.

    1998-01-01

    OBJECTIVE: To compare the commissioning of contraception services by London health authorities with accepted models of good practice. DESIGN: Combined interview and postal surveys of all health authorities and National Health Service (NHS) trusts responsible for running family planning clinics in the Greater London area. MAIN OUTCOME MEASURES: Health authority commissioning was assessed on the presence of four key elements of good practice--strategies, coordination, service specifications, and quality standards in contracts--by monitoring activity and quality. RESULTS: Less than half the health authorities surveyed had written strategies or service specifications for contraception services. Arrangements for coordination of services were limited and monitoring was underdeveloped. CONCLUSION: The process of commissioning services for contraception seems to be relatively underdeveloped despite the importance of health problems associated with unplanned pregnancy in London. These findings raise questions about the capacity of health authorities to improve the quality of these services through the commissioning process. PMID:10185140

  2. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilmer, J.

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided,more » this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.« less

  3. Effectiveness monitoring for the aquatic and riparian component of the Northwest Forest Plan: conceptual framework and options.

    Treesearch

    Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael Tehan

    2004-01-01

    An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...

  4. Northwest Forest Plan—the first 10 years (1994-2003): status and trends of populations and nesting habitat for the marbled murrelet.

    Treesearch

    Mark H. Huff; Martin G. Raphael; Sherri L. Miller; S. Kim Nelson; Jim Baldwin

    2006-01-01

    The Northwest Forest Plan (the Plan) is a large-scale ecosystem management plan for federal land in the Pacific Northwest. Marbled murrelet (Brachyramphus marmoratus) populations and habitat were monitored to evaluate effectiveness of the Plan. The chapters in this volume summarize information on marbled murrelet ecology and present the monitoring...

  5. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  6. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  7. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  8. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  9. 9 CFR 54.8 - Requirements for flock plans and post-exposure management and monitoring plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Requirements for flock plans and post... and post-exposure management and monitoring plans. (a) The owner of the flock or his or her agent must...: Utilization of a live-animal screening test; restrictions on the animals that may be moved from the flock...

  10. Enhanced dynamic wedge and independent monitor unit verification.

    PubMed

    Howlett, S J

    2005-03-01

    Some serious radiation accidents have occurred around the world during the delivery of radiotherapy treatment. The regrettable incident in Panama clearly indicated the need for independent monitor unit (MU) verification. Indeed the International Atomic Energy Agency (IAEA), after investigating the incident, made specific recommendations for radiotherapy centres which included an independent monitor unit check for all treatments. Independent monitor unit verification is practiced in many radiotherapy centres in developed countries around the world. It is mandatory in USA but not yet in Australia. This paper describes development of an independent MU program, concentrating on the implementation of the Enhanced Dynamic Wedge (EDW) component. The difficult case of non centre of field (COF) calculation points under the EDW was studied in some detail. Results of a survey of Australasian centres regarding the use of independent MU check systems is also presented. The system was developed with reference to MU calculations made by Pinnacle 3D Radiotherapy Treatment Planning (RTP) system (ADAC - Philips) for 4MV, 6MV and 18MV X-ray beams used at the Newcastle Mater Misericordiae Hospital (NMMH) in the clinical environment. A small systematic error was detected in the equation used for the EDW calculations. Results indicate that COF equations may be used in the non COF situation with similar accuracy to that achieved with profile corrected methods. Further collaborative work with other centres is planned to extend these findings.

  11. The NOAA Integrated Surface Irradiance Study (ISIS)-A New Surface Radiation Monitoring Program.

    NASA Astrophysics Data System (ADS)

    Hicks, B. B.; Deluisi, J. J.; Matt, D. R.

    1996-12-01

    This paper describes a new radiation monitoring program, the Integrated Surface Irradiance Study (ISIS), that builds upon and takes over from earlier NOAA networks monitoring components of solar radiation [both the visible component (SOLRAD) and the shortwave component that causes sunburn, UV-B] across the continental United States. ISIS is implemented in two levels. Level 1 addresses incoming radiation only, and level 2 addresses the surface radiation balance. Level 2 also constitutes the SURFRAD (Surface Radiation) program of the NOAA Office of Global Programs, specifically intended to provide radiation data to support large-scale hydrologic studies that will be conducted under the Global Energy and Water Cycle Experiment. Eventually, it is planned for level 2 sites to monitor all components of the surface energy balance. Both levels of ISIS will eventually measure both visible and UV radiation components. At present, there are nine sites that are considered to be at ISIS level 1 standard and an additional four level 2 SURFRAD sites. A 10th level 1 site will be in operation soon. Plans call for an increase in the number of sites of both kinds, up to about 15 ISIS sites, of which 6 will be at the SURFRAD level. Data are available via FTP at ftp.atdd.noaa.govlpublisis or at http://www.srrb.noaa.gov (level 2).

  12. Machine learning-based patient specific prompt-gamma dose monitoring in proton therapy

    NASA Astrophysics Data System (ADS)

    Gueth, P.; Dauvergne, D.; Freud, N.; Létang, J. M.; Ray, C.; Testa, E.; Sarrut, D.

    2013-07-01

    Online dose monitoring in proton therapy is currently being investigated with prompt-gamma (PG) devices. PG emission was shown to be correlated with dose deposition. This relationship is mostly unknown under real conditions. We propose a machine learning approach based on simulations to create optimized treatment-specific classifiers that detect discrepancies between planned and delivered dose. Simulations were performed with the Monte-Carlo platform Gate/Geant4 for a spot-scanning proton therapy treatment and a PG camera prototype currently under investigation. The method first builds a learning set of perturbed situations corresponding to a range of patient translation. This set is then used to train a combined classifier using distal falloff and registered correlation measures. Classifier performances were evaluated using receiver operating characteristic curves and maximum associated specificity and sensitivity. A leave-one-out study showed that it is possible to detect discrepancies of 5 mm with specificity and sensitivity of 85% whereas using only distal falloff decreases the sensitivity down to 77% on the same data set. The proposed method could help to evaluate performance and to optimize the design of PG monitoring devices. It is generic: other learning sets of deviations, other measures and other types of classifiers could be studied to potentially reach better performance. At the moment, the main limitation lies in the computation time needed to perform the simulations.

  13. Scientific monitoring plan in support of the selected alternative of the Glen Canyon Dam Long-Term Experimental and Management Plan

    USGS Publications Warehouse

    Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Sankey, Joel B.; Yackulic, Charles B.; Schmidt, John C.

    2017-01-18

    IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and provides technical advice to the AMWG. It is composed of technical and science representatives from the same agencies and stakeholder groups who serve on the AMWG. GCMRC is the primary science provider to the GCDAMP and also coordinates many aspects of the science performed by cooperators and partner agencies. The Science Advisors Program provides independent science reviews and advice at the request of the GCDAMP.The plan proposed here necessarily depends on (1) the protocol for decision-making and the requirements for scientific data reporting described in the LTEMP ROD, (2) the priorities of the GCDAMP as directed by the LTEMP ROD (see Department of the Interior, 2016b, section 6.1), (3) the priorities for monitoring and research in the conservation measures section of the Biological Opinion for the LTEMP (U.S. Department of the Interior, 2016b, LTEMP ROD attachment E), (4) the priorities for resource management and information needs established by Federal and State resource-management agencies within the GCDAMP, (5) scientific understanding about the linkage between the status of those resources and operations of Glen Canyon Dam, and (6) the need to resolve existing scientific uncertainties about the linkage between dam operations and the condition of resources. We note that resource-management prioritization is fundamentally a policy decision charged specifically to DOI for the Colorado River in Glen and Grand Canyons, as outlined most recently in the LTEMP ROD, and is not the responsibility of the GCMRC. However, it is the responsibility of the GCMRC to describe the nature of scientific understanding, the nature of scientific uncertainty, and the risk of making resourcemanagement decisions in the face of existing scientific uncertainty. The goals of science activities in the next 20 years are to inform operational decisions regarding Glen Canyon Dam operations described in the LTEMP ROD, resolve remaining scientific uncertainties, and to monitor resource trends that are affected entirely, or in part, by dam operations.

  14. A Quality Assurance Initiative for Commercial-Scale Production in High-Throughput Cryopreservation of Blue Catfish Sperm

    PubMed Central

    Hu, E; Liao, T. W.; Tiersch, T. R.

    2013-01-01

    Cryopreservation of fish sperm has been studied for decades at a laboratory (research) scale. However, high-throughput cryopreservation of fish sperm has recently been developed to enable industrial-scale production. This study treated blue catfish (Ictalurus furcatus) sperm high-throughput cryopreservation as a manufacturing production line and initiated quality assurance plan development. The main objectives were to identify: 1) the main production quality characteristics; 2) the process features for quality assurance; 3) the internal quality characteristics and their specification designs; 4) the quality control and process capability evaluation methods, and 5) the directions for further improvements and applications. The essential product quality characteristics were identified as fertility-related characteristics. Specification design which established the tolerance levels according to demand and process constraints was performed based on these quality characteristics. Meanwhile, to ensure integrity throughout the process, internal quality characteristics (characteristics at each quality control point within process) that could affect fertility-related quality characteristics were defined with specifications. Due to the process feature of 100% inspection (quality inspection of every fish), a specific calculation method, use of cumulative sum (CUSUM) control charts, was applied to monitor each quality characteristic. An index of overall process evaluation, process capacity, was analyzed based on in-control process and the designed specifications, which further integrates the quality assurance plan. With the established quality assurance plan, the process could operate stably and quality of products would be reliable. PMID:23872356

  15. 78 FR 63962 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...: Scientific research, monitoring or habitat restoration exceptions, state and individual research plans... research, scientific monitoring, and fisheries activities conducted under an approved 4(d) program or plan..., 5 or 20 hours, depending on the research or plan. Burden Hours: 1,760. Needs and Uses: This request...

  16. Active transportation monitoring plan : initial evaluation of bicycling and walking baseline & planned traffic counts through 2015.

    DOT National Transportation Integrated Search

    2011-09-06

    Active Transportation in the form of bicycle and pedestrian traffic, is monitored for the Austin-Round Rock-San Marcos, TX region by the Capital Area Metropolitan Planning Organization using a variety of methods: automatic, manual and surveyed. This ...

  17. Test/QA Plan (TQAP) for Verification of Semi-Continuous Ambient Air Monitoring Systems

    EPA Science Inventory

    The purpose of the semi-continuous ambient air monitoring technology (or MARGA) test and quality assurance plan is to specify procedures for a verification test applicable to commercial semi-continuous ambient air monitoring technologies. The purpose of the verification test is ...

  18. 24 CFR 91.330 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.330 Section 91.330 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Consolidated Plan § 91.330 Monitoring. The consolidated plan must describe the standards and procedures that...

  19. 24 CFR 91.430 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring. 91.430 Section 91.430 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development... Plan § 91.430 Monitoring. The consolidated plan must describe the standards and procedures that the...

  20. 13. Operational planning for a specific intervention.

    PubMed

    2014-05-01

    Every intervention must follow an operational plan. Operational plans delineate actions required to meet an objective that is part of the strategic plan (overarching goal). Operational plans dictate the critical pathways for the interventions that will be followed during and following the implementation of the intervention. Operational plans include: (1) an introduction and brief situation report; (2) an overview of the task(s), objectives, and the overarching goal to be addressed; (3) the methods that will be employed; (4) planning factors; (5) the resources that will be required including personnel, equipment, and supplies; (6) timelines, benchmarks, and milestones including their respective indicators, startup time, end point, and estimates of the time required for completion; (7) the administrative structure to be employed; (8) an operating budget; (9) the strategy for acquiring the funding required; (10) roles and responsibilities of the personnel including position descriptions and the competencies required of the personnel (skill sets); (11) mechanisms for monitoring the progress including the indicators that will be employed, (12) safety, including health of the personnel, required immunisations, accommodations, and reporting structure; (13) self-sufficiency; and (14) reporting and accounting. There are many generic items in an operational plan that can be used in successive plans. Without a detailed operational plan, interventions are doomed to probable failure and can profoundly negatively impact other projects operational in the area.

  1. 36 CFR 219.30 - Plan documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated... years; and a display of the budget trends over at least the past 5 years. (e) Other components. A plan...

  2. Bioassessment Tools for Stony Corals: Monitoring Approaches and Proposed Sampling Plan for the U.S. Virgin Islands

    EPA Science Inventory

    This document describes three general approaches to the design of a sampling plan for biological monitoring of coral reefs. Status assessment, trend detection and targeted monitoring each require a different approach to site selection and statistical analysis. For status assessm...

  3. 40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...

  4. 40 CFR 58.10 - Annual monitoring network plan and periodic network assessment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Annual monitoring network plan and periodic network assessment. 58.10 Section 58.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.10 Annual...

  5. 77 FR 40860 - Strategic Plan for Federal Research and Monitoring of Ocean Acidification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... Plan for Federal Research and Monitoring of Ocean Acidification AGENCY: National Marine Fisheries... Federal Research and Monitoring of Ocean Acidification is being made available for public review and... understanding of the process of ocean acidification, its effects on marine ecosystems, and the steps that could...

  6. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loll, C.M.

    1995-09-05

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  7. Developing and Monitoring Individual Education Plans for Handicapped Children.

    ERIC Educational Resources Information Center

    Armstrong, Mary Lee

    The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…

  8. Resource Management in the Microgravity Science Division

    NASA Technical Reports Server (NTRS)

    Casselle, Justine

    2004-01-01

    In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

  9. Late-successional and old-growth forest effectiveness monitoring plan for the Northwest Forest Plan.

    Treesearch

    Miles Hemstrom; Thomas Spies; Craig Palmer; Ross Kiester; John Teply; Phil McDonald; Ralph. Warbington

    1998-01-01

    This report presents options for long-term effectiveness monitoring of late-successional and old-growth forests under the Northwest Forest Plan. It describes methods to answer questions about how much late-successional forest exists on Federal land, its pattern, how it’s changing, and if the Forest Plan is providing for its conservation and management. It specifies...

  10. Five secrets to leveraging maximum buying power with your media project.

    PubMed

    Hirsch, Lonnie

    2010-11-01

    Planning and executing a successful media campaign or project requires knowledge and expert execution of specific techniques and skills, including understanding of the requirements for proper media research and competitive intelligence, effective planning of media schedules, negotiation of best rates with media companies, monitoring the campaign, accurately tracking and evaluating results, and making smart adjustments based on tracking data to maximize the profitability and success of the enterprise. Some of the most important knowledge and techniques are not generally known by most advertisers, particularly small businesses like health care practices. This article reveals these tips that are the most effective and includes information on the use of experts and other professional resources that help increase the likelihood of a successful outcome for a well-planned and executed media campaign. Copyright © 2010 Elsevier Inc. All rights reserved.

  11. Patient monitoring in mobile health: opportunities and challenges.

    PubMed

    Mohammadzadeh, Niloofar; Safdari, Reza

    2014-01-01

    In most countries chronic diseases lead to high health care costs and reduced productivity of people in society. The best way to reduce costs of health sector and increase the empowerment of people is prevention of chronic diseases and appropriate health activities management through monitoring of patients. To enjoy the full benefits of E-health, making use of methods and modern technologies is very important. This literature review articles were searched with keywords like Patient monitoring, Mobile Health, and Chronic Disease in Science Direct, Google Scholar and Pub Med databases without regard to the year of publications. Applying remote medical diagnosis and monitoring system based on mobile health systems can help significantly to reduce health care costs, correct performance management particularly in chronic disease management. Also some challenges are in patient monitoring in general and specific aspects like threats to confidentiality and privacy, technology acceptance in general and lack of system interoperability with electronic health records and other IT tools, decrease in face to face communication between doctor and patient, sudden interruptions of telecommunication networks, and device and sensor type in specific aspect. It is obvious identifying the opportunities and challenges of mobile technology and reducing barriers, strengthening the positive points will have a significant role in the appropriate planning and promoting the achievements of the health care systems based on mobile and helps to design a roadmap for improvement of mobile health.

  12. Veterans’ Health Care: Limited Progress Made to Address Concerns That Led to High Risk Designation

    DTIC Science & Technology

    2017-03-15

    partially meet two of the five criteria GAO uses to assess removal from the High-Risk List ( leadership commitment and an action plan), but it has not met...the other three (agency capacity, monitoring efforts, and demonstrated progress). Specifically, VA officials have taken leadership actions such as...high-risk designation, additional actions are required of VA, including: (1) demonstrating stronger leadership support as it continues its

  13. Application and Interpretation of Bioassay and Biomonitoring: A Planning Document.

    DTIC Science & Technology

    1987-10-13

    TNO (The Hague) 9.00 Ecotoxicological risks (drs. tarquenie) 9.20 Hamburg (dr. Tent) - development of dredging and disposal - problems and solutions...MICROCOPY RESOLUTION TEST CHART NATIJAL BURIAU O’ STANU4RDS %, a KTJO86 4-47 Aquatic -estuarine- macrophytes as monitoring organisms for trace metals Dr...that specific aquatic macrophytes may serve as good bio-accumulators of heavy metals and that these plants could be used to quantify the

  14. SU-E-T-76: A Software System to Monitor VMAT Plan Complexity in a Large Radiotherapy Centre

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arumugam, S; Xing, A; Ingham Institute, Sydney, NSW

    2015-06-15

    Purpose: To develop a system that analyses and reports the complexity of Volumetric Modulated Arc Therapy (VMAT) plans to aid in the decision making for streamlining patient specific dosimetric quality assurance (QA) tests. Methods: A software system, Delcheck, was developed in-house to calculate VMAT plan and delivery complexity using the treatment delivery file. Delcheck has the functionality to calculate multiple plan complexity metrics including the Li-Xing Modulation Index (LI-MI), multiplicative combination of Leaf Travel and Modulation Complexity Score (LTMCSv), Monitor Units per prescribed dose (MU/D) and the delivery complexity index (MIt) that incorporates the modulation of dose rate, leaf speedmore » and gantry speed. Delcheck includes database functionality to store and compare plan metrics for a specified treatment site. The overall plan and delivery complexity is assessed based on the 95% conformance limit of the complexity metrics as Similar, More or Less complex. The functionality of the software was tested using 42 prostate conventional, 10 prostate SBRT and 15 prostate bed VMAT plans generated for an Elekta linear accelerator. Results: The mean(σ) of LI-MI for conventional, SBRT and prostate bed plans were 1690(486), 3215.4(1294) and 3258(982) respectively. The LTMCSv of the studied categories were 0.334(0.05), 0.325(0.07) and 0.3112(0.09). The MU/D of the studied categories were 2.4(0.4), 2.7(0.7) and 2.5(0.5). The MIt of the studied categories were 21.6(3.4), 18.2(3.0) and 35.9(6.6). The values of the complexity metrics show that LI-MI appeared to resolve the plan complexity better than LTMCSv and MU/D. The MIt value increased as the delivery complexity increased. Conclusion: The developed software was shown to be working as expected. In studied treatment categories Prostate bed plans are more complex in both plan and delivery and SBRT is more complex in plan and less complex in delivery as demonstrated by LI-MI and MIt. This project was funded through a Cancer Council NSW Project Grant (RG14-11)« less

  15. When goals collide: monitoring the goals of multiple characters.

    PubMed

    Magliano, Joseph P; Taylor, Holly A; Kim, Hyun-Jeong Joyce

    2005-12-01

    Most story plots contain multiple characters who are independent, interact, and often have conflicting goals. One would expect that narrative understanding would require monitoring of the goals, concerns, and situations of multiple agents. There is considerable evidence that understanders monitor the primary protagonist's goal plans (e.g., Suh & Trabasso, 1993). However, there is relatively little research on the extent to which understanders monitor the goals of multiple agents. We investigated the impact of characters' roles and prominence on the extent to which understanders monitor the goal plans of multiple characters in a feature length film. In Experiment 1, participants made situation change judgments, and in Experiment 2, they verbally described scenes. Both types of judgments indicated that viewers monitor the goals and plans of multiple agents but do so to a greater extent for characters more prominent to the plotline.

  16. Plan execution monitoring with distributed intelligent agents for battle command

    NASA Astrophysics Data System (ADS)

    Allen, James P.; Barry, Kevin P.; McCormick, John M.; Paul, Ross A.

    2004-07-01

    As military tactics evolve toward execution centric operations the ability to analyze vast amounts of mission relevant data is essential to command and control decision making. To maintain operational tempo and achieve information superiority we have developed Vigilant Advisor, a mobile agent-based distributed Plan Execution Monitoring system. It provides military commanders with continuous contingency monitoring tailored to their preferences while overcoming the network bandwidth problem often associated with traditional remote data querying. This paper presents an overview of Plan Execution Monitoring as well as a detailed view of the Vigilant Advisor system including key features and statistical analysis of resource savings provided by its mobile agent-based approach.

  17. Improving the use of health data for health system strengthening.

    PubMed

    Nutley, Tara; Reynolds, Heidi W

    2013-02-13

    Good quality and timely data from health information systems are the foundation of all health systems. However, too often data sit in reports, on shelves or in databases and are not sufficiently utilised in policy and program development, improvement, strategic planning and advocacy. Without specific interventions aimed at improving the use of data produced by information systems, health systems will never fully be able to meet the needs of the populations they serve. To employ a logic model to describe a pathway of how specific activities and interventions can strengthen the use of health data in decision making to ultimately strengthen the health system. A logic model was developed to provide a practical strategy for developing, monitoring and evaluating interventions to strengthen the use of data in decision making. The model draws on the collective strengths and similarities of previous work and adds to those previous works by making specific recommendations about interventions and activities that are most proximate to affect the use of data in decision making. The model provides an organizing framework for how interventions and activities work to strengthen the systematic demand, synthesis, review, and use of data. The logic model and guidance are presented to facilitate its widespread use and to enable improved data-informed decision making in program review and planning, advocacy, policy development. Real world examples from the literature support the feasible application of the activities outlined in the model. The logic model provides specific and comprehensive guidance to improve data demand and use. It can be used to design, monitor and evaluate interventions, and to improve demand for, and use of, data in decision making. As more interventions are implemented to improve use of health data, those efforts need to be evaluated.

  18. 78 FR 14226 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... groundfish sector to request exemptions from Federal fishing regulations through its annual operations plan... rule implementing the annual sector operations plans. However, sectors can request exemptions at any...-funded at-sea monitoring program will be required to develop a monitoring plan as part of its operation...

  19. Establishing a regional monitoring strategy: The Pacific Northwest Forest Plan

    Treesearch

    Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett

    1999-01-01

    This paper identifies lessons learned and issues raised during the development of an ecosystem monitoring strategy intended to support the Northwest Forest Plan. Adaptive ecosystem management, which requires monitoring as essential feedback to management, recognizes that action is necessary or appropriate, although knowledge may be imperfect. We suggest that this...

  20. Using Current and Historic Climate Data and Bayesian Belief Networks to Predict Optimum Satellite Image Acquisition Periods for Detecting Cheatgrass on the Snake River Plain, Idaho

    NASA Astrophysics Data System (ADS)

    Rope, R. C.; Ames, D. P.; Jerry, T. D.; Cherry, S. J.

    2005-12-01

    Invasive plant species, such as Bromus tectorum (cheatgrass), cost the United States over $36 billion per year and have encroached upon over 100 million acres while impacting range site productivity, disturbing wildlife habitat, altering the wildland fire regime and frequencies, and reducing biodiversity. Because of these adverse impacts, federal, tribal, state, and county land managers are faced with the challenge of prevention, early detection, management, and monitoring of invasive plants. Often these managers rely on the analysis of remotely sensed imagery as part of their management plan. However, it's difficult to predict specific phenological events that allow for the spectral discrimination of invasive species using only remotely sensed imagery. To address this issue tools are being developed to model and view optimal periods to collect high spatial and/or spectral resolution remotely sensed data for refined detection and mapping of invasive species and for use as a decision support tool for land managers. These tools involve the integration of historic and current climate data (cumulative growing days and precipitation) satellite imagery (MODIS) and Bayesian Belief Networks, and a web ArcIMS application to distribute the information. The general approach is to issue an initial forecast early in the year based on the previous years' data. As the year progresses, air temperature, precipitation and newly acquired low resolution MODIS satellite imagery will be used to update the prediction. Updating will be accomplished using a Bayesian Belief Network model that indicates the probabilistic relationships between prior years' conditions and those of the current year. These tools have specific application in providing a means for which land managers can efficiently and effectively detect, map, and monitor invasive plant species, specifically cheatgrass, in western rangelands. This information can then be integrated into management studies and plans to help land managers more accurately and completely determine areas infested with cheatgrass to aid in their eradication practices and future management plans.

  1. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  2. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  3. The role of research methodology in the rational use of technology in monitoring and preventing communication disorders.

    PubMed

    Chiari, Brasília M; Goulart, Bárbara N G

    2009-09-01

    Studies showing stronger scientific evidence related to speech, language and hearing pathology (SLP) have an impact on the prevention and rehabilitation of human communication and gained ground in SLP research agenda. In this paper we discuss some aspects and directions that should be considered for in-depth knowledge about speech, language and hearing needs in different population groups (age group, gender and other variables according to specific related disorders) for improved comprehensive care, successful efforts and effective use of financial and human resources. It is also discussed the decision making process for requesting complementary evaluations and tests, from routine to highly complex ones, that should be based on each test and/or procedure and their contribution to the diagnosis and therapeutic planning. In fact, it is crucial to have reliable parameters for planning, preventing and treating human communication and its related disorders. Epidemiology, biostatistics and social sciences can contribute with more specific information in human communication sciences and guide more specific studies on the international science and technology agenda, improving communication sciences involvement in the international health-related scientific scenario.

  4. [Implementation of a safety and health planning system in a teaching hospital].

    PubMed

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  5. Antimicrobial resistance: harmonisation of national antimicrobial resistance monitoring and surveillance programmes in animals and in animal-derived food.

    PubMed

    Franklin, A; Acar, J; Anthony, F; Gupta, R; Nicholls, T; Tamura, Y; Thompson, S; Threlfall, E J; Vose, D; van Vuuren, M; White, D G; Wegener, H C; Costarrica, M L

    2001-12-01

    A guideline on the harmonisation of national antimicrobial resistance monitoring and surveillance programmes in animals and animal-derived foods has been developed by the Ad hoc Group of experts on antimicrobial resistance of the Office International des Epizooties. The objective of the guideline is to allow the generation of comparable data from various national surveillance and monitoring systems in order to compare the situations in different regions or countries and to consolidate results at the national, regional and international level. Definitions of surveillance and monitoring are provided. National systems should be able to detect the emergence of resistance, and to determine the prevalence of resistant bacteria. The resulting data should be used in the assessment of risks to public health and should contribute to the establishment of a risk management policy. Specific factors identified for harmonisation include the animal species, food commodities, sampling plans, bacterial species, antimicrobials to be tested, laboratory methods, data reporting, database structure and the structure of reports.

  6. WE-H-BRC-05: Catastrophic Error Metrics for Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murphy, S; Molloy, J

    Purpose: Intuitive evaluation of complex radiotherapy treatments is impractical, while data transfer anomalies create the potential for catastrophic treatment delivery errors. Contrary to prevailing wisdom, logical scrutiny can be applied to patient-specific machine settings. Such tests can be automated, applied at the point of treatment delivery and can be dissociated from prior states of the treatment plan, potentially revealing errors introduced early in the process. Methods: Analytical metrics were formulated for conventional and intensity modulated RT (IMRT) treatments. These were designed to assess consistency between monitor unit settings, wedge values, prescription dose and leaf positioning (IMRT). Institutional metric averages formore » 218 clinical plans were stratified over multiple anatomical sites. Treatment delivery errors were simulated using a commercial treatment planning system and metric behavior assessed via receiver-operator-characteristic (ROC) analysis. A positive result was returned if the erred plan metric value exceeded a given number of standard deviations, e.g. 2. The finding was declared true positive if the dosimetric impact exceeded 25%. ROC curves were generated over a range of metric standard deviations. Results: Data for the conventional treatment metric indicated standard deviations of 3%, 12%, 11%, 8%, and 5 % for brain, pelvis, abdomen, lung and breast sites, respectively. Optimum error declaration thresholds yielded true positive rates (TPR) between 0.7 and 1, and false positive rates (FPR) between 0 and 0.2. Two proposed IMRT metrics possessed standard deviations of 23% and 37%. The superior metric returned TPR and FPR of 0.7 and 0.2, respectively, when both leaf position and MUs were modelled. Isolation to only leaf position errors yielded TPR and FPR values of 0.9 and 0.1. Conclusion: Logical tests can reveal treatment delivery errors and prevent large, catastrophic errors. Analytical metrics are able to identify errors in monitor units, wedging and leaf positions with favorable sensitivity and specificity. In part by Varian.« less

  7. Northwest Forest Plan—the first 10 years (1994–2003): socioeconomic monitoring results.

    Treesearch

    S. Charnley

    2006-01-01

    The socioeconomic monitoring report addresses two evaluation questions posed in the Northwest Forest Plan (the Plan) Record of Decision and assesses progress in meeting five Plan socioeconomic goals. Volume I of the report contains key findings. Volume II addresses the question, Are predictable levels of timber and nontimber resources available and being produced? It...

  8. Northern spotted owl effectiveness monitoring plan for the Northwest Forest Plan.

    Treesearch

    Joseph Lint; Barry Noon; Robert Anthony; Eric Forsman; Martin Raphael; Michael Collopy; Edward. Starkey

    1999-01-01

    This report describes options for effectiveness monitoring of long-term status and trends of the northern spotted owl to evaluate the success of the Northwest Forest Plan in arresting downward population trends, and in maintaining and restoring the habitat conditions necessary to support viable owl populations on Federal lands. It describes options to address...

  9. Marbled murrelet effectiveness monitoring plan for the Northwest Forest Plan.

    Treesearch

    Sarah Madsen; Diane Evans; Thomas Hamer; Paul Henson; Sherri Miller; S. Kim Nelson; Daniel Roby; Martin Stapanian

    1999-01-01

    This report describes options for effectiveness monitoring of long-term status and trends to evaluate the success of the Northwest Forest Plan in maintaining and restoring marbled murrelet nesting habitat and populations on Federal lands. A two-phase approach is described that begins with developing reliable and repeatable processes for identifying nesting habitat and...

  10. Water quality monitoring strategies - A review and future perspectives.

    PubMed

    Behmel, S; Damour, M; Ludwig, R; Rodriguez, M J

    2016-11-15

    The reliable assessment of water quality through water quality monitoring programs (WQMPs) is crucial in order for decision-makers to understand, interpret and use this information in support of their management activities aiming at protecting the resource. The challenge of water quality monitoring has been widely addressed in the literature since the 1940s. However, there is still no generally accepted, holistic and practical strategy to support all phases of WQMPs. The purpose of this paper is to report on the use cases a watershed manager has to address to plan or optimize a WQMP from the challenge of identifying monitoring objectives; selecting sampling sites and water quality parameters; identifying sampling frequencies; considering logistics and resources to the implementation of actions based on information acquired through the WQMP. An inventory and critique of the information, approaches and tools placed at the disposal of watershed managers was proposed to evaluate how the existing information could be integrated in a holistic, user-friendly and evolvable solution. Given the differences in regulatory requirements, water quality standards, geographical and geological differences, land-use variations, and other site specificities, a one-in-all solution is not possible. However, we advance that an intelligent decision support system (IDSS) based on expert knowledge that integrates existing approaches and past research can guide a watershed manager through the process according to his/her site-specific requirements. It is also necessary to tap into local knowledge and to identify the knowledge needs of all the stakeholders through participative approaches based on geographical information systems and adaptive survey-based questionnaires. We believe that future research should focus on developing such participative approaches and further investigate the benefits of IDSS's that can be updated quickly and make it possible for a watershed manager to obtain a timely, holistic view and support for every aspect of planning and optimizing a WQMP. Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Rockfall Milepoint 49 Monitoring Plan for Check Dams on Mt. Hood Highway (US 26) (M.P. 49.10 to M.P. 49.23)

    DOT National Transportation Integrated Search

    2003-07-31

    This Stormwater BMP Monitoring Plan details the approach to be used for monitoring : roadside ditch sediment traps located on Highway 26 in the Mt. Hood National Forest. : These sediment traps were designed and installed by ODOT for the capture of se...

  12. Incremental planning to control a blackboard-based problem solver

    NASA Technical Reports Server (NTRS)

    Durfee, E. H.; Lesser, V. R.

    1987-01-01

    To control problem solving activity, a planner must resolve uncertainty about which specific long-term goals (solutions) to pursue and about which sequences of actions will best achieve those goals. A planner is described that abstracts the problem solving state to recognize possible competing and compatible solutions and to roughly predict the importance and expense of developing these solutions. With this information, the planner plans sequences of problem solving activities that most efficiently resolve its uncertainty about which of the possible solutions to work toward. The planner only details actions for the near future because the results of these actions will influence how (and whether) a plan should be pursued. As problem solving proceeds, the planner adds new details to the plan incrementally, and monitors and repairs the plan to insure it achieves its goals whenever possible. Through experiments, researchers illustrate how these new mechanisms significantly improve problem solving decisions and reduce overall computation. They briefly discuss current research directions, including how these mechanisms can improve a problem solver's real-time response and can enhance cooperation in a distributed problem solving network.

  13. Planning for court monitoring

    DOT National Transportation Integrated Search

    1987-03-01

    Court monitoring is a planned approach to studying the handling of DWI offenders, from arrest through sentencing, either through actually observing court hearings or by reviewing case outcomes in court files. The booklet is designed to help groups in...

  14. A retrospective analysis for patient-specific quality assurance of volumetric-modulated arc therapy plans.

    PubMed

    Li, Guangjun; Wu, Kui; Peng, Guang; Zhang, Yingjie; Bai, Sen

    2014-01-01

    Volumetric-modulated arc therapy (VMAT) is now widely used clinically, as it is capable of delivering a highly conformal dose distribution in a short time interval. We retrospectively analyzed patient-specific quality assurance (QA) of VMAT and examined the relationships between the planning parameters and the QA results. A total of 118 clinical VMAT cases underwent pretreatment QA. All plans had 3-dimensional diode array measurements, and 69 also had ion chamber measurements. Dose distribution and isocenter point dose were evaluated by comparing the measurements and the treatment planning system (TPS) calculations. In addition, the relationship between QA results and several planning parameters, such as dose level, control points (CPs), monitor units (MUs), average field width, and average leaf travel, were also analyzed. For delivered dose distribution, a gamma analysis passing rate greater than 90% was obtained for all plans and greater than 95% for 100 of 118 plans with the 3%/3-mm criteria. The difference (mean ± standard deviation) between the point doses measured by the ion chamber and those calculated by TPS was 0.9% ± 2.0% for all plans. For all cancer sites, nasopharyngeal carcinoma and gastric cancer have the lowest and highest average passing rates, respectively. From multivariate linear regression analysis, the dose level (p = 0.001) and the average leaf travel (p < 0.001) showed negative correlations with the passing rate, and the average field width (p = 0.003) showed a positive correlation with the passing rate, all indicating a correlation between the passing rate and the plan complexity. No statistically significant correlation was found between MU or CP and the passing rate. Analysis of the results of dosimetric pretreatment measurements as a function of VMAT plan parameters can provide important information to guide the plan parameter setting and optimization in TPS. Copyright © 2014 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  15. A retrospective analysis for patient-specific quality assurance of volumetric-modulated arc therapy plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Guangjun; Wu, Kui; Peng, Guang

    2014-01-01

    Volumetric-modulated arc therapy (VMAT) is now widely used clinically, as it is capable of delivering a highly conformal dose distribution in a short time interval. We retrospectively analyzed patient-specific quality assurance (QA) of VMAT and examined the relationships between the planning parameters and the QA results. A total of 118 clinical VMAT cases underwent pretreatment QA. All plans had 3-dimensional diode array measurements, and 69 also had ion chamber measurements. Dose distribution and isocenter point dose were evaluated by comparing the measurements and the treatment planning system (TPS) calculations. In addition, the relationship between QA results and several planning parameters,more » such as dose level, control points (CPs), monitor units (MUs), average field width, and average leaf travel, were also analyzed. For delivered dose distribution, a gamma analysis passing rate greater than 90% was obtained for all plans and greater than 95% for 100 of 118 plans with the 3%/3-mm criteria. The difference (mean ± standard deviation) between the point doses measured by the ion chamber and those calculated by TPS was 0.9% ± 2.0% for all plans. For all cancer sites, nasopharyngeal carcinoma and gastric cancer have the lowest and highest average passing rates, respectively. From multivariate linear regression analysis, the dose level (p = 0.001) and the average leaf travel (p < 0.001) showed negative correlations with the passing rate, and the average field width (p = 0.003) showed a positive correlation with the passing rate, all indicating a correlation between the passing rate and the plan complexity. No statistically significant correlation was found between MU or CP and the passing rate. Analysis of the results of dosimetric pretreatment measurements as a function of VMAT plan parameters can provide important information to guide the plan parameter setting and optimization in TPS.« less

  16. Risk assessment and risk management at the Canadian Food Inspection Agency (CFIA): a perspective on the monitoring of foods for chemical residues.

    PubMed

    Bietlot, Henri P; Kolakowski, Beata

    2012-08-01

    The Canadian Food Inspection Agency (CFIA) uses 'Ranked Risk Assessment' (RRA) to prioritize chemical hazards for inclusion in monitoring programmes or method development projects based on their relative risk. The relative risk is calculated for a chemical by scoring toxicity and exposure in the 'risk model scoring system' of the Risk Priority Compound List (RPCL). The relative ranking and the risk management options are maintained and updated in the RPCL. The ranking may be refined by the data generated by the sampling and testing programs. The two principal sampling and testing programmes are the National Chemical Residue Monitoring Program (NCRMP) and the Food Safety Action Plan (FSAP). The NCRMP sampling plans focus on the analysis of federally registered products (dairy, eggs, honey, meat and poultry, fresh and processed fruit and vegetable commodities, and maple syrup) for residues of veterinary drugs, pesticides, environmental contaminants, mycotoxins, and metals. The NCRMP is complemented by the Food Safety Action Plan (FSAP) targeted surveys. These surveys focus on emerging chemical hazards associated with specific foods or geographical regions for which applicable maximum residue limits (MRLs) are not set. The data from the NCRMP and FSAP also influence the risk management (follow-up) options. Follow-up actions vary according to the magnitude of the health risk, all with the objective of preventing any repeat occurrence to minimize consumer exposure to a product representing a potential risk to human health. © Her Majesty the Queen in Right of Canada 2012. Drug Testing and Analysis © 2012 John Wiley & Sons, Ltd.

  17. Improving IMRT delivery efficiency using intensity limits during inverse planning.

    PubMed

    Coselmon, Martha M; Moran, Jean M; Radawski, Jeffrey D; Fraass, Benedick A

    2005-05-01

    Inverse planned intensity modulated radiotherapy (IMRT) fields can be highly modulated due to the large number of degrees of freedom involved in the inverse planning process. Additional modulation typically results in a more optimal plan, although the clinical rewards may be small or offset by additional delivery complexity and/or increased dose from transmission and leakage. Increasing modulation decreases delivery efficiency, and may lead to plans that are more sensitive to geometrical uncertainties. The purpose of this work is to assess the use of maximum intensity limits in inverse IMRT planning as a simple way to increase delivery efficiency without significantly affecting plan quality. Nine clinical cases (three each for brain, prostate, and head/neck) were used to evaluate advantages and disadvantages of limiting maximum intensity to increase delivery efficiency. IMRT plans were generated using in-house protocol-based constraints and objectives for the brain and head/neck, and RTOG 9406 dose volume objectives in the prostate. Each case was optimized at a series of maximum intensity ratios (the product of the maximum intensity and the number of beams divided by the prescribed dose to the target volume), and evaluated in terms of clinical metrics, dose-volume histograms, monitor units (MU) required per fraction (SMLC and DMLC delivery), and intensity map variation (a measure of the beam modulation). In each site tested, it was possible to reduce total monitor units by constraining the maximum allowed intensity without compromising the clinical acceptability of the plan. Monitor unit reductions up to 38% were observed for SMLC delivery, while reductions up to 29% were achieved for DMLC delivery. In general, complicated geometries saw a smaller reduction in monitor units for both delivery types, although DMLC delivery required significantly more monitor units in all cases. Constraining the maximum intensity in an inverse IMRT plan is a simple way to improve delivery efficiency without compromising plan objectives.

  18. The Development of a Minority Recruitment Plan for Cancer Clinical Trials

    PubMed Central

    Trevino, Monica; Padalecki, Susan; Karnad, Anand; Parra, Alberto; Weitman, Steve; Nashawati, Melissa; Pollock, Brad H.; Ramirez, Amelie; Thompson, Ian M.

    2014-01-01

    Background Cancer does not occur in all ethnic and racial groups at similar rates. In addition, responses to treatment also vary in certain ethnic and racial groups. For Hispanics, the overall cancer incidence is generally lower yet for some specific tumor types, the incidence rates are higher compared to other populations. Objectives Although disparities are recognized for treatment outcomes and prevention methodologies for Hispanics and other minority populations, specific recruiting and reporting of minorities remains a challenge. In order to circumvent this problem, the Cancer Therapy and Research Center (CTRC) has developed a new minority recruitment plan for all cancer related clinical trials at this Institute. The overall goal of this initiative is to increase the accrual of minorities in cancer clinical trials by implementing several key interventions. Method The Cancer Therapy & Research Center (CTRC) at the University of Texas Health Science Center at San Antonio established the Clinical Trials Accrual Task Force to develop and monitor interventions designed to increase accrual to cancer clinical trials, specifically the accrual of minorities with a focus on the Hispanic population that makes up 68% of the CTRC's catchment area. Results A Minority Accrual Plan (MAP) was implemented in March 2013 as part of the process for initiating and conducting cancer-related clinical trials at the CTRC. The Minority Accrual Plan focuses on Hispanic enrollment due to the characteristics of the South Texas population served by the CTRC but could be easily adapted to other populations. Conclusions The CTRC has designed a process to prospectively address the challenge of deliberately enrolling minority subjects and accurately accounting for the results by implementing a Minority Accrual Plan for every cancer-related clinical trial at CTRC. PMID:25152846

  19. The Development of a Minority Recruitment Plan for Cancer Clinical Trials.

    PubMed

    Trevino, Monica; Padalecki, Susan; Karnad, Anand; Parra, Alberto; Weitman, Steve; Nashawati, Melissa; Pollock, Brad H; Ramirez, Amelie; Thompson, Ian M

    2013-09-01

    Cancer does not occur in all ethnic and racial groups at similar rates. In addition, responses to treatment also vary in certain ethnic and racial groups. For Hispanics, the overall cancer incidence is generally lower yet for some specific tumor types, the incidence rates are higher compared to other populations. Although disparities are recognized for treatment outcomes and prevention methodologies for Hispanics and other minority populations, specific recruiting and reporting of minorities remains a challenge. In order to circumvent this problem, the Cancer Therapy and Research Center (CTRC) has developed a new minority recruitment plan for all cancer related clinical trials at this Institute. The overall goal of this initiative is to increase the accrual of minorities in cancer clinical trials by implementing several key interventions. The Cancer Therapy & Research Center (CTRC) at the University of Texas Health Science Center at San Antonio established the Clinical Trials Accrual Task Force to develop and monitor interventions designed to increase accrual to cancer clinical trials, specifically the accrual of minorities with a focus on the Hispanic population that makes up 68% of the CTRC's catchment area. A Minority Accrual Plan (MAP) was implemented in March 2013 as part of the process for initiating and conducting cancer-related clinical trials at the CTRC. The Minority Accrual Plan focuses on Hispanic enrollment due to the characteristics of the South Texas population served by the CTRC but could be easily adapted to other populations. The CTRC has designed a process to prospectively address the challenge of deliberately enrolling minority subjects and accurately accounting for the results by implementing a Minority Accrual Plan for every cancer-related clinical trial at CTRC.

  20. Applications of artificial intelligence to rotorcraft

    NASA Technical Reports Server (NTRS)

    Abbott, Kathy H.

    1987-01-01

    The application of AI technology may have significant potential payoff for rotorcraft. In the near term, the status of the technology will limit its applicability to decision aids rather than total automation. The specific application areas are categorized into onboard and nonflight aids. The onboard applications include: fault monitoring, diagnosis, and reconfiguration; mission and tactics planning; situation assessment; navigation aids, especially in nap-of-the-earth flight; and adaptive man-machine interfaces. The nonflight applications include training and maintenance diagnostics.

  1. Site Plan Safety Submission for Sampling, Monitoring, and Decontamination of Mustard Agent - South Plant, Rocky Mountain Arsenal. Volume 1

    DTIC Science & Technology

    1988-10-01

    sample these ducts. This judgement was based on the following factors : 1. The ducts were open to the atmosphere. 2. RMA records of building area samples...selected based on several factors including piping arrangements, volume to be sampled, sampling equipment flow rates, and the flow rate necessary for...effective sampling. Therefore, each sampling point strategy and procedure was customized based on these factors . The individual specific sampling

  2. Software engineering project management - A state-of-the-art report

    NASA Technical Reports Server (NTRS)

    Thayer, R. H.; Lehman, J. H.

    1977-01-01

    The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.

  3. Development and validation of a MRgHIFU non-invasive tissue acoustic property estimation technique.

    PubMed

    Johnson, Sara L; Dillon, Christopher; Odéen, Henrik; Parker, Dennis; Christensen, Douglas; Payne, Allison

    2016-11-01

    MR-guided high-intensity focussed ultrasound (MRgHIFU) non-invasive ablative surgeries have advanced into clinical trials for treating many pathologies and cancers. A remaining challenge of these surgeries is accurately planning and monitoring tissue heating in the face of patient-specific and dynamic acoustic properties of tissues. Currently, non-invasive measurements of acoustic properties have not been implemented in MRgHIFU treatment planning and monitoring procedures. This methods-driven study presents a technique using MR temperature imaging (MRTI) during low-temperature HIFU sonications to non-invasively estimate sample-specific acoustic absorption and speed of sound values in tissue-mimicking phantoms. Using measured thermal properties, specific absorption rate (SAR) patterns are calculated from the MRTI data and compared to simulated SAR patterns iteratively generated via the Hybrid Angular Spectrum (HAS) method. Once the error between the simulated and measured patterns is minimised, the estimated acoustic property values are compared to the true phantom values obtained via an independent technique. The estimated values are then used to simulate temperature profiles in the phantoms, and compared to experimental temperature profiles. This study demonstrates that trends in acoustic absorption and speed of sound can be non-invasively estimated with average errors of 21% and 1%, respectively. Additionally, temperature predictions using the estimated properties on average match within 1.2 °C of the experimental peak temperature rises in the phantoms. The positive results achieved in tissue-mimicking phantoms presented in this study indicate that this technique may be extended to in vivo applications, improving HIFU sonication temperature rise predictions and treatment assessment.

  4. Wildlife monitoring program plan

    NASA Technical Reports Server (NTRS)

    Sebesta, P.; Arno, R.

    1979-01-01

    A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.

  5. Evaluation of a commercial automatic treatment planning system for liver stereotactic body radiation therapy treatments.

    PubMed

    Gallio, Elena; Giglioli, Francesca Romana; Girardi, Andrea; Guarneri, Alessia; Ricardi, Umberto; Ropolo, Roberto; Ragona, Riccardo; Fiandra, Christian

    2018-02-01

    Automated treatment planning is a new frontier in radiotherapy. The Auto-Planning module of the Pinnacle 3 treatment planning system (TPS) was evaluated for liver stereotactic body radiation therapy treatments. Ten cases were included in the study. Six plans were generated for each case by four medical physics experts. The first two planned with Pinnacle TPS, both with manual module (MP) and Auto-Planning one (AP). The other two physicists generated two plans with Monaco TPS (VM). Treatment plan comparisons were then carried on the various dosimetric parameters of target and organs at risk, monitor units, number of segments, plan complexity metrics and human resource planning time. The user dependency of Auto-Planning was also tested and the plans were evaluated by a trained physician. Statistically significant differences (Anova test) were observed for spinal cord doses, plan average beam irregularity, number of segments, monitor units and human planning time. The Fisher-Hayter test applied to these parameters showed significant statistical differences between AP e MP for spinal cord doses and human planning time; between MP and VM for monitor units, number of segments and plan irregularity; for all those between AP and VM. The two plans created by different planners with AP were similar to each other. The plans created with Auto-Planning were comparable to the manually generated plans. The time saved in planning enables the planner to commit more resources to more complex cases. The independence of the planner enables to standardize plan quality. Copyright © 2018 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  6. ACS (Alma Common Software) operating a set of robotic telescopes

    NASA Astrophysics Data System (ADS)

    Westhues, C.; Ramolla, M.; Lemke, R.; Haas, M.; Drass, H.; Chini, R.

    2014-07-01

    We use the ALMA Common Software (ACS) to establish a unified middleware for robotic observations with the 40cm Optical, 80cm Infrared and 1.5m Hexapod telescopes located at OCA (Observatorio Cerro Armazones) and the ESO 1-m located at La Silla. ACS permits to hide from the observer the technical specifications, like mount-type or camera-model. Furthermore ACS provides a uniform interface to the different telescopes, allowing us to run the same planning program for each telescope. Observations are carried out for long-term monitoring campaigns to study the variability of stars and AGN. We present here the specific implementation to the different telescopes.

  7. Appraisal of Hydrologic Information Needed in Anticipation of Lignite Mining in Lauderdale County, Tennessee

    USGS Publications Warehouse

    Parks, William Scott

    1981-01-01

    Lignite in western Tennessee occurs as lenses or beds at various stratigraphic horizons in the Coastal Plain sediments of Late Cretaceous and Tertiary age. The occurrence of this lignite has been known for many decades, but not until the energy crisis was it considered an important energy resource. In recent years, several energy companies have conducted extensive exploration programs in western Tennessee, and tremendous reserves of lignite have been found. From available information, Lauderdale County was selected as one of the counties where strip-mining of lignite will most likely occur. Lignite in this county occurs in the Jackson and Cockfield Formations, undivided, of Tertiary age. The hydrology of the county is known only from regional studies and the collection of some site-specific data. Therefore, in anticipation of the future mining of lignite, a plan is needed for obtaining hydrologic and geologic information to adequately define the hydrologic system before mining begins and to monitor the effects of strip-mining once it is begun. For this planning effort, available hydrologic, geologic, land use, and associated data were located and compiled; a summary description of the surface and shallow subsurface hydrologic system was prepared: the need for additional baseline hydrologic information was outlined; and plans to monitor the effects of strip-mining were proposed. This planning approach, although limited to a county area, has transferability to other Coastal Plain areas under consideration for strip-mining of lignite.

  8. An improved FIB sample preparation technique for site-specific plan-view specimens: A new cutting geometry.

    PubMed

    Li, Chen; Habler, Gerlinde; Baldwin, Lisa C; Abart, Rainer

    2018-01-01

    Focused ion beam (FIB) sample preparation technique in plan-view geometry allows direct correlations of the atomic structure study via transmission electron microscopy with micrometer-scale property measurements. However, one main technical difficulty is that a large amount of material must be removed underneath the specimen. Furthermore, directly monitoring the milling process is difficult unless very large material volumes surrounding the TEM specimen site are removed. In this paper, a new cutting geometry is introduced for FIB lift-out sample preparation with plan-view geometry. Firstly, an "isolated" cuboid shaped specimen is cut out, leaving a "bridge" connecting it with the bulk material. Subsequently the two long sides of the "isolated" cuboid are wedged, forming a triangular prism shape. A micromanipulator needle is used for in-situ transfer of the specimen to a FIB TEM grid, which has been mounted parallel with the specimen surface using a simple custom-made sample slit. Finally, the grid is transferred to the standard FIB grid holder for final thinning with standard procedures. This new cutting geometry provides clear viewing angles for monitoring the milling process, which solves the difficulty of judging whether the specimen has been entirely detached from the bulk material, with the least possible damage to the surrounding materials. With an improved success rate and efficiency, this plan-view FIB lift-out specimen preparation technique should have a wide application for material science. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  9. Allocating monitoring effort in the face of unknown unknowns

    USGS Publications Warehouse

    Wintle, B.A.; Runge, M.C.; Bekessy, S.A.

    2010-01-01

    There is a growing view that to make efficient use of resources, ecological monitoring should be hypothesis-driven and targeted to address specific management questions. 'Targeted' monitoring has been contrasted with other approaches in which a range of quantities are monitored in case they exhibit an alarming trend or provide ad hoc ecological insights. The second form of monitoring, described as surveillance, has been criticized because it does not usually aim to discern between competing hypotheses, and its benefits are harder to identify a priori. The alternative view is that the existence of surveillance data may enable rapid corroboration of emerging hypotheses or help to detect important 'unknown unknowns' that, if undetected, could lead to catastrophic outcomes or missed opportunities. We derive a model to evaluate and compare the efficiency of investments in surveillance and targeted monitoring. We find that a decision to invest in surveillance monitoring may be defensible if: (1) the surveillance design is more likely to discover or corroborate previously unknown phenomena than a targeted design and (2) the expected benefits (or avoided costs) arising from discovery are substantially higher than those arising from a well-planned targeted design. Our examination highlights the importance of being explicit about the objectives, costs and expected benefits of monitoring in a decision analytic framework. ?? 2010 Blackwell Publishing Ltd/CNRS.

  10. Nonprofit to for-profit conversions by hospitals, health insurers, and health plans.

    PubMed

    Needleman, J

    1999-01-01

    Conversion of hospitals, health insurers, and health plans from nonprofit to for-profit ownership has become a focus of national debate. The author examines why nonprofit ownership has been dominant in the US health system and assesses the strength of the argument that nonprofits provide community benefits that would be threatened by for-profit conversion. The author concludes that many of the specific community benefits offered by nonprofits, such as care for the poor, could be maintained or replaced by adequate funding of public programs and that quality and fairness in treatment can be better assured through clear standards of care and adequate monitoring systems. As health care becomes increasingly commercialized, the most difficult parts of nonprofits' historic mission to preserve are the community orientation, leadership role, and innovation that nonprofit hospitals and health plans have provided out of their commitment to a community beyond those to whom they sell services.

  11. Clinical Trials Targeting Aging and Age-Related Multimorbidity

    PubMed Central

    Crimmins, Eileen M; Grossardt, Brandon R; Crandall, Jill P; Gelfond, Jonathan A L; Harris, Tamara B; Kritchevsky, Stephen B; Manson, JoAnn E; Robinson, Jennifer G; Rocca, Walter A; Temprosa, Marinella; Thomas, Fridtjof; Wallace, Robert; Barzilai, Nir

    2017-01-01

    Abstract Background There is growing interest in identifying interventions that may increase health span by targeting biological processes underlying aging. The design of efficient and rigorous clinical trials to assess these interventions requires careful consideration of eligibility criteria, outcomes, sample size, and monitoring plans. Methods Experienced geriatrics researchers and clinical trialists collaborated to provide advice on clinical trial design. Results Outcomes based on the accumulation and incidence of age-related chronic diseases are attractive for clinical trials targeting aging. Accumulation and incidence rates of multimorbidity outcomes were developed by selecting at-risk subsets of individuals from three large cohort studies of older individuals. These provide representative benchmark data for decisions on eligibility, duration, and assessment protocols. Monitoring rules should be sensitive to targeting aging-related, rather than disease-specific, outcomes. Conclusions Clinical trials targeting aging are feasible, but require careful design consideration and monitoring rules. PMID:28364543

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haney, Thomas Jay

    This report documents the Data Quality Objectives (DQOs) developed for the Idaho National Laboratory (INL) Site ambient air surveillance program. The development of the DQOs was based on the seven-step process recommended “for systematic planning to generate performance and acceptance criteria for collecting environmental data” (EPA 2006). The process helped to determine the type, quantity, and quality of data needed to meet current regulatory requirements and to follow U.S. Department of Energy guidance for environmental surveillance air monitoring design. It also considered the current air monitoring program that has existed at INL Site since the 1950s. The development of themore » DQOs involved the application of the atmospheric dispersion model CALPUFF to identify likely contamination dispersion patterns at and around the INL Site using site-specific meteorological data. Model simulations were used to quantitatively assess the probable frequency of detection of airborne radionuclides released by INL Site facilities using existing and proposed air monitors.« less

  13. Analysis of post-tensioned girders structural behaviour using continuous temperature and strain monitoring

    NASA Astrophysics Data System (ADS)

    Bednarski, Ł.; Sieńko, R.; Howiacki, T.

    2017-10-01

    This article presents the possibility of using structural health monitoring system data for the analysis of structure’s operation during its life cycle. Within the specific case study it was proved, that continuous, automatic and long term monitoring of selected physical quantities such as strains and temperatures, can significantly improve the assessment of technical condition by identifying hazardous phenomena. In this work the analysis of structural behaviour of post-tensioned girders within the roofing of sport halls in Cracow, Poland, was performed based on measurement results and verified by numerical model carried out in SOFiSTiK software. Thanks to the possibility of performing calculations in real time and informing the manager of the object about abnormalities it is possible to manage the structure in effective way by, inter alia, planning the renovations or supporting decisions about snow removal.

  14. Planning for execution monitoring on a planetary rover

    NASA Technical Reports Server (NTRS)

    Gat, Erann; Firby, R. James; Miller, David P.

    1990-01-01

    A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.

  15. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  16. A representation for error detection and recovery in robot task plans

    NASA Technical Reports Server (NTRS)

    Lyons, D. M.; Vijaykumar, R.; Venkataraman, S. T.

    1990-01-01

    A general definition is given of the problem of error detection and recovery in robot assembly systems, and a general representation is developed for dealing with the problem. This invariant representation involves a monitoring process which is concurrent, with one monitor per task plan. A plan hierarchy is discussed, showing how diagnosis and recovery can be handled using the representation.

  17. A system to evaluate the scientific quality of biological and restoration objectives using National Wildlife Refuge Comprehensive Conservation Plans as a case study

    USGS Publications Warehouse

    Schroeder, R.L.

    2006-01-01

    It is widely accepted that plans for restoration projects should contain specific, measurable, and science-based objectives to guide restoration efforts. The United States Fish and Wildlife Service (USFWS) is in the process of developing Comprehensive Conservation Plans (CCPs) for more than 500 units in the National Wildlife Refuge System (NWRS). These plans contain objectives for biological and ecosystem restoration efforts on the refuges. Based on USFWS policy, a system was developed to evaluate the scientific quality of such objectives based on three critical factors: (1) Is the objective specific, measurable, achievable, results-oriented, and time-fixed? (2) What is the extent of the rationale that explains the assumptions, logic, and reasoning for the objective? (3) How well was available science used in the development of the objective? The evaluation system scores each factor on a scale of 1 (poor) to 4 (excellent) according to detailed criteria. The biological and restoration objectives from CCPs published as of September 2004 (60 total) were evaluated. The overall average score for all biological and restoration objectives was 1.73. Average scores for each factor were: Factor 1-1.97; Factor 2-1.86; Factor 3-1.38. The overall scores increased from 1997 to 2004. Future restoration efforts may benefit by using this evaluation system during the process of plan development, to ensure that biological and restoration objectives are of the highest scientific quality possible prior to the implementation of restoration plans, and to allow for improved monitoring and adaptive management.

  18. Predicting intraoperative feasibility of combined TES-mMEP and cSSEP monitoring during scoliosis surgery based on preoperative neurophysiological assessment.

    PubMed

    Azabou, Eric; Manel, Véronique; Abelin-Genevois, Kariman; Andre-Obadia, Nathalie; Cunin, Vincent; Garin, Christophe; Kohler, Remi; Berard, Jérôme; Ulkatan, Sedat

    2014-07-01

    Combined monitoring of muscle motor evoked potentials elicited by transcranial electric stimulation (TES-mMEP) and cortical somatosensory evoked potentials (cSSEPs) is safe and effective for spinal cord monitoring during scoliosis surgery. However, TES-mMEP/cSSEP is not always feasible. Predictors of feasibility would help to plan the monitoring strategy. To identify predictors of the feasibility of TES-mMEP/cSSEP during scoliosis surgery. Prospective cohort study in a clinical neurophysiology unit and pediatric orthopedic department of a French university hospital. A total of 103 children aged 2 to 19 years scheduled for scoliosis surgery. Feasibility rate of intraoperative TES-mMEP/cSSEP monitoring. All patients underwent a preoperative neurological evaluation and preoperative mMEP and cSSEP recordings at both legs. For each factor associated with feasibility, we computed sensitivity, specificity, positive predictive value (PPV), and negative predictive value. A decision tree was designed. Presence of any of the following factors was associated with 100% feasibility, 100% specificity, and 100% PPV: idiopathic scoliosis, normal preoperative neurological findings, and normal preoperative mMEP and cSSEP recordings. Feasibility was 0% in the eight patients with no recordable mMEPs or cSSEPs during preoperative testing. A decision tree involving three screening steps can be used to identify patients in whom intraoperative TES-mMEP/cSSEP is feasible. Preoperative neurological and neurophysiological assessments are helpful for identifying patients who can be successfully monitored by TES-mMEP/cSSEP during scoliosis surgery. Copyright © 2014 Elsevier Inc. All rights reserved.

  19. Research and guidelines for implementing Fatigue Risk Management Systems for the French regional airlines.

    PubMed

    Cabon, Philippe; Deharvengt, Stephane; Grau, Jean Yves; Maille, Nicolas; Berechet, Ion; Mollard, Régis

    2012-03-01

    This paper describes research that aims to provide the overall scientific basis for implementation of a Fatigue Risk Management System (FRMS) for French regional airlines. The current research has evaluated the use of different tools and indicators that would be relevant candidates for integration into the FRMS. For the Fatigue Risk Management component, results show that biomathematical models of fatigue are useful tools to help an airline to prevent fatigue related to roster design and for the management of aircrew planning. The Fatigue Safety assurance includes two monitoring processes that have been evaluated during this research: systematic monitoring and focused monitoring. Systematic monitoring consists of the analysis of existing safety indicators such as Air Safety Reports (ASR) and Flight Data Monitoring (FDM). Results show a significant relationship between the hours of work and the frequency of ASR. Results for the FDM analysis show that some events are significantly related to the fatigue risk associated with the hours of works. Focused monitoring includes a website survey and specific in-flight observations and data collection. Sleep and fatigue measurements have been collected from 115 aircrews over 12-day periods (including rest periods). Before morning duties, results show a significant sleep reduction of up to 40% of the aircrews' usual sleep needs leading to a clear increase of fatigue during flights. From these results, specific guidelines are developed to help the airlines to implement the FRMS and for the airworthiness to oversight the implementation of the FRMS process. Copyright © 2011 Elsevier Ltd. All rights reserved.

  20. Application of nutrient intake values (NIVs).

    PubMed

    Vorster, Hester H; Murphy, Suzanne P; Allen, Lindsay H; King, Janet C

    2007-03-01

    The process of applying nutrient intake values (NIVs) for dietary assessment, planning, and implementing programs is discussed in this paper. In addition to assessing, monitoring, and evaluating nutritional situations, applications include planning food policies, strategies, and programs for promotion of optimal nutrition and preventing and treating malnutrition (both over- and undernutrition). Other applications include nutrition education, food and nutrient legislation, marketing and labeling, research, product development, food procurement and trade (import and export), food aid, and therapeutic (clinical) nutrition. Specific examples of how NIVs are used to develop food labels, fortification policies, and food-based dietary guidelines are described. Applications in both developed and developing countries are also described. In summary, NIVs are the scientific backbone of all aspects of nutrition policy in countries and regions worldwide.

  1. Revolutionary Deep Space Science Missions Enabled by Onboard Autonomy

    NASA Technical Reports Server (NTRS)

    Chien, Steve; Debban, Theresa; Yen, Chen wan; Sherwood, Robert; Castano, Rebecca; Cichy, Benjamin; Davies, Ashley; Brul, Michael; Fukunaga, Alex; Fukunaga, Alex; hide

    2003-01-01

    Breakthrough autonomy technologies enable a new range of spire missions that acquire vast amounts of data and return only the most scientifically important data to Earth. These missions would monitor science phenomena in great detail (either with frequent observations or at extremely high spatial resolution) and onboard analyze the data to detect specific science events of interest. These missions would monitor volcanic eruptions, formation and movement of aeolian features. and atmospheric phenomena. The autonomous spacecraft would respond to science events by planning its future operations to revisit or perform complementary observations. In this paradigm, the spacecraft represents the scientists agent enabling optimization of the downlink data volume resource. This paper describes preliminary efforts to define and design such missions.

  2. Tools and approaches to operationalize the commitment to equity, gender and human rights: towards leaving no one behind in the Sustainable Development Goals.

    PubMed

    Zamora, Gerardo; Koller, Theadora Swift; Thomas, Rebekah; Manandhar, Mary; Lustigova, Eva; Diop, Adama; Magar, Veronica

    2018-01-01

    The objective of this article is to present specific resources developed by the World Health Organization on equity, gender and human rights in order to support Member States in operationalizing their commitment to leave no one behind in the health Sustainable Development Goals (SDGs), and other health-related goals and targets. The resources cover: (i) health inequality monitoring; (ii) barrier analysis using mixed methods; (iii) human rights monitoring; (iv) leaving no one behind in national and subnational health sector planning; and (v) equity, gender and human rights in national health programme reviews. Examples of the application of the tools in a range of country contexts are provided for each resource.

  3. SU-E-T-473: A Patient-Specific QC Paradigm Based On Trajectory Log Files and DICOM Plan Files

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DeMarco, J; McCloskey, S; Low, D

    Purpose: To evaluate a remote QC tool for monitoring treatment machine parameters and treatment workflow. Methods: The Varian TrueBeamTM linear accelerator is a digital machine that records machine axis parameters and MLC leaf positions as a function of delivered monitor unit or control point. This information is saved to a binary trajectory log file for every treatment or imaging field in the patient treatment session. A MATLAB analysis routine was developed to parse the trajectory log files for a given patient, compare the expected versus actual machine and MLC positions as well as perform a cross-comparison with the DICOM-RT planmore » file exported from the treatment planning system. The parsing routine sorts the trajectory log files based on the time and date stamp and generates a sequential report file listing treatment parameters and provides a match relative to the DICOM-RT plan file. Results: The trajectory log parsing-routine was compared against a standard record and verify listing for patients undergoing initial IMRT dosimetry verification and weekly and final chart QC. The complete treatment course was independently verified for 10 patients of varying treatment site and a total of 1267 treatment fields were evaluated including pre-treatment imaging fields where applicable. In the context of IMRT plan verification, eight prostate SBRT plans with 4-arcs per plan were evaluated based on expected versus actual machine axis parameters. The average value for the maximum RMS MLC error was 0.067±0.001mm and 0.066±0.002mm for leaf bank A and B respectively. Conclusion: A real-time QC analysis program was tested using trajectory log files and DICOM-RT plan files. The parsing routine is efficient and able to evaluate all relevant machine axis parameters during a patient treatment course including MLC leaf positions and table positions at time of image acquisition and during treatment.« less

  4. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  5. Remote sensing applied to crop disease control, urban planning, and monitoring aquatic plants, oil spills, rangelands, and soil moisture

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The application of remote sensing techniques to land management, urban planning, agriculture, oceanography, and environmental monitoring is discussed. The results of various projects are presented along with cost effective considerations.

  6. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  7. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  8. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  9. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  10. Cornhusker Army Ammunition Plant Longterm Groundwater Monitoring Health and Safety Plan

    DTIC Science & Technology

    1997-06-01

    Enclosed please find fifteen copies of the final Health and Safety Plan for the long term ground water monitoring at the Cornhusker Army Ammunitions...Plant. Enclosed within the plan is a letter dated June 6, 1997 containing responses to the comments received from William Houser. The responses to Mr. Houser’s comments have also been incorporated into the document as appropriate.

  11. Northwest Forest Plan—the first 10 years (1994-2003): synthesis of monitoring and research results.

    Treesearch

    Richard W. Haynes; Bernard T. Bormann; Danny C. Lee; Jon R. Martin

    2006-01-01

    It has been 10 years since the Northwest Forest Plan (the Plan) came into being at the direction of President Clinton. This report synthesizes the status and trends of five major elements of the Plan: older forests, species, aquatic systems, socioeconomics, and adaptive management and monitoring. It synthesizes new science that has resulted from a decade of research....

  12. How do we know how many salmon returned to spawn? Implementing the California Coastal salmonid monitoring plan in Mendocino County, California

    Treesearch

    Sean P. Gallagher; David W. Wright

    2012-01-01

    California's coastal salmon and steelhead populations are listed under California and Federal Endangered Species Acts; both require monitoring to provide measures of recovery. Since 2004 the California Department of Fish and Game and NOAA Fisheries have been developing a monitoring plan for California¡¯s coastal salmonids (the California Coastal Salmonid...

  13. A theoretical/experimental program to develop active optical pollution sensors, part 2

    NASA Technical Reports Server (NTRS)

    Poultney, S. K.

    1975-01-01

    Progress is reported on experimental investigations of Lidar and the application of Lidar to environmental and atmospheric science. Specifically the following programs are considered: calibration and application of the LaRC 48-inch Lidar; efficient and certain detection of SO2 and other gases in the calibration tank using the Raman Stack Monitor Lidar; the potential of Lidar remote sensing from the space shuttle; and the planning and mounting of efforts to realize the promise of backscatter differential absorption Lidar.

  14. Utility Monitoring and Control System (UMCS) and Utility Metering Plan and Specifications for Fort Leonard Wood, MO

    DTIC Science & Technology

    2017-06-22

    setup” versus “use” issue. What rights does Honeywell need to run the software? We/Honeywell may not know. Discuss with Jabe? We may need to just try...Summary: It appears the direction we are going will be to install new me- ters in buildings, connect them to the Smart Servers, run the data through...damper blade type (check the appropriate item) Flat late Airfoil Calculate the nominal damper face velocity Face velocity = Flow rate ÷ Area

  15. Identifying sediment sources in the sediment TMDL process

    USGS Publications Warehouse

    Gellis, Allen C.; Fitzpatrick, Faith A.; Schubauer-Berigan, Joseph P.; Landy, R.B.; Gorman Sanisaca, Lillian E.

    2015-01-01

    Sediment is an important pollutant contributing to aquatic-habitat degradation in many waterways of the United States. This paper discusses the application of sediment budgets in conjunction with sediment fingerprinting as tools to determine the sources of sediment in impaired waterways. These approaches complement monitoring, assessment, and modeling of sediment erosion, transport, and storage in watersheds. Combining the sediment fingerprinting and sediment budget approaches can help determine specific adaptive management plans and techniques applied to targeting hot spots or areas of high erosion.

  16. Developing a Prototype Handbook for Monitoring and Evaluating Department of Defense Humanitarian Assistance Projects

    DTIC Science & Technology

    2011-01-01

    caloric intake could stand alone as a single specific indicator for com- munity nutritional status if necessary. The caloric intake indicator is also...principle, the user’s guide and the primer can each stand alone. Those already experienced with M&E or assessment can go directly to the user’s...planning and data collection were very valuable, as was the ability for each section of the handbook (i.e., the primer and user’s guide) to stand

  17. Ahead with Cairo. Monitoring country activities.

    PubMed

    Danguilan, M; Wainer, J; Widyantoro, N; Capoor, I; Huq, N; Ashino, Y; Sadasivam, B; Le Thi Nham Tuyet

    1995-04-01

    In the aftermath of the 1994 UN Conference on Population and Development (ICPD) in Cairo, countries are proceeding with their implementation of the plan of action adopted at the conference. A brief description is given of some actions taken by specific countries toward plan implementation. In the Philippines meetings were held immediately after the conference in October on the implications for the Management, Family Planning, and Nongovernmental Organizations programs. The issues of concern were identified as the need for regular consultative meetings among relevant agencies, consultations with women's groups, and a responsive adolescents program. In Australia the program thrust was to focus on the implications for immigration. Monitoring of the plans of action will be undertaken by nongovernmental organizations (NGOs). In Malaysia committees are preparing a program of action suitable for implementation in Malaysia. A regional women's NGO organized a forum on the implications of ICPD for women's reproductive health, women's rights, and empowerment in Malaysia. In Vietnam, press conferences are used to communicate conference results. An NGO translated relevant ICPD materials into Vietnamese. In Indonesia, several ministries convened meetings among donors, NGOs, women's groups, and experts. In India, the government held a national conference. One view was that population issues should be discussed in the context of gender equality and empowerment of women. Another issue was the importance of placing reproductive health in the larger context of health and primary health services. Health personnel at all levels were considered in need of sensitization on gender issues. Problems such as anemia have not been successfully addressed in existing programs. The government agreed to remove in phases target driven programs and the sterilization emphasis. In Bangladesh, a national committee was formed, and NGOs are actively distributing information. In Japan, the Family Planning Federation in a collaborative effort is actively promoting concrete actions.

  18. State Wildlife Action Plans as Tools for Adapting to a Continuously Changing Climate

    NASA Astrophysics Data System (ADS)

    Metivier, D. W.; Yocum, H.; Ray, A. J.

    2015-12-01

    Public land management plans are potentially powerful policies for building sustainability and adaptive capacity. Land managers are recognizing the need to respond to numerous climate change impacts on natural and human systems. For the first time, in 2015, the federal government required each state to incorporate climate change into their State Wildlife Action Plans (SWAP) as a condition for funding. As important land management tools, SWAPs have the potential to guide state agencies in shaping and implementing practices for climate change adaptation. Intended to be revised every ten years, SWAPs can change as conditions and understanding of climate change evolves. This study asks what practices are states using to integrate climate change, and how does this vary between states? To answer this question, we conducted a broad analysis among seven states (CO, MT, NE, ND, SD, UT, WY) and a more in-depth analysis of four states (CO, ND, SD, WY). We use seven key factors that represent best practices for incorporating climate change identified in the literature. These best practices are species prioritization, key habitats, threats, monitoring, partnerships and participation, identification of management options, and implementation of management options. The in-depth analysis focuses on how states are using climate change information for specific habitats addressed in the plans. We find that states are integrating climate change in many different ways, showing varying degrees of sophistication and preparedness. We summarize different practices and highlight opportunities to improve the effectiveness of plans through: communication tools across state lines and stakeholders, explicit targeting of key habitats, enforcement and monitoring progress and success, and conducting vulnerability analyses that incorporate topics beyond climate and include other drivers, trajectories, and implications of historic and future land-use change.

  19. SU-E-T-62: A Preliminary Experience of Using EPID Transit Dosimetry for Monitoring Daily Dose Variations in Radiation Treatment Delivery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yao, R; Chisela, W

    2015-06-15

    Purpose: To investigate the use of EPID transit dosimetry for monitoring daily dose variations in radiation treatment delivery. Methods: A patient with head and neck cancer treated using nine field IMRT beams was used in this study. The prescription was 45 Gy in 25 fractions. A KV CBCT was acquired before each treatment on a Varian NTX linear accelerator. Integrated images using MV EPID were acquired for each treatment beam. Planning CT images, treatment plan, and daily integrated images were imported into a commercial QA software Dosimetry Check (v4r4 Math Resolutions, LLC, Columbia, MD) to calculate 3D dose of themore » day assuming 25 fractions treatment. Planning CT images were deformed and registered to each daily CBCT using Varian SmartAdapt (v11.MR2). ROIs were then propagated from planning CT to daily CBCT. The correlation between maximum, average dose of ROIs and ROI volume, center of mass shift, Dice Similarity Coefficient (DSC) were investigated. Results: Not all parameters investigated showed strong correlations. For PTV and CTV, the average dose has inverse correlation with their volume change (correlation coefficient −0.52, −0.50, respectively) and DSC (−0.59, −0.59, respectively). The average dose of right parotid has correlation with its volume change (0.56). The maximum dose of spinal cord has correlation with the center of mass superior-inferior shift (0.52) and inverse correlation with the center of mass anterior-posterior shift (−0.73). Conclusion: Transit dosimetry using EPID images collected during treatment delivery offers great potential to monitor daily dose variations due to patient anatomy change, motion, and setup errors in radiation treatment delivery. It can provide a patient-specific QA tool valuable for adaptive radiation therapy. Further work is needed to validate the technique.« less

  20. Accidental spills at sea--risk, impact, mitigation and the need for co-ordinated post-incident monitoring.

    PubMed

    Kirby, Mark F; Law, Robin J

    2010-06-01

    A fully integrated and effective response to an oil or chemical spill at sea must include a well planned and executed post-incident assessment of environmental contamination and damage. While salvage, rescue and clean-up operations are generally well considered, including reviews and exercises, the expertise, resources, networks and logistical planning required to achieve prompt and effective post-spill impact assessment and monitoring are not generally well established. The arrangement and co-ordination of post-incident monitoring and impact assessment need to consider sampling design, biological effects, chemical analysis and collection/interpretation of expert local knowledge. This paper discusses the risks, impacts and mitigation options associated with accidental spills and considers the importance of pre-considered impact assessment and monitoring programmes in the wider response cycle. The PREMIAM (Pollution Response in Emergencies: Marine Impact Assessment and Monitoring; www.premiam.org) project is considered as an example of an improved approach to the planning, co-ordination and conduct of post-incident monitoring.

  1. Dosimetric comparison of single-beam multi-arc and 2-beam multi-arc VMAT optimization in the Monaco treatment planning system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalet, Alan M., E-mail: amkalet@uw.edu; Seattle Cancer Care Alliance, Seattle, Washington; Richardson, Hannah L.

    The purpose of this study was to evaluate the dosimetric and practical effects of the Monaco treatment planning system “max arcs-per-beam” optimization parameter in pelvic radiotherapy treatments. We selected for this study a total of 17 previously treated patients with a range of pelvic disease sites including prostate (9), bladder (1), uterus (3), rectum (3), and cervix (1). For each patient, 2 plans were generated, one using an arc-per-beam setting of “1” and another with an arc-per-beam setting of “2” using the volumes and constraints established from the initial clinical treatments. All constraints and dose coverage objects were kept themore » same between plans, and all plans were normalized to 99.7% to ensure 100% of the planning target volume (PTV) received 95% of the prescription dose. Plans were evaluated for PTV conformity, homogeneity, number of monitor units, number of control points, and overall plan acceptability. Treatment delivery time, patient-specific quality assurance procedures, and the impact on clinical workflow were also assessed. We found that for complex-shaped target volumes (small central volumes with extending arms to cover nodal regions), the use of 2 arc-per-beam (2APB) parameter setting achieved significantly lower average dose-volume histogram values for the rectum V{sub 20} (p = 0.0012) and bladder V{sub 30} (p = 0.0036) while meeting the high dose target constraints. For simple PTV shapes, we found reduced monitor units (13.47%, p = 0.0009) and control points (8.77%, p = 0.0004) using 2APB planning. In addition, we found a beam delivery time reduction of approximately 25%. In summary, the dosimetric benefit, although moderate, was improved over a 1APB setting for complex PTV, and equivalent in other cases. The overall reduced delivery time suggests that the use of mulitple arcs per beam could lead to reduced patient-on-table time, increased clinical throughput, and reduced medical physics quality assurance effort.« less

  2. Central Alaska Network vital signs monitoring plan

    USGS Publications Warehouse

    MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug

    2005-01-01

    Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.

  3. Application of constraint-based satellite mission planning model in forest fire monitoring

    NASA Astrophysics Data System (ADS)

    Guo, Bingjun; Wang, Hongfei; Wu, Peng

    2017-10-01

    In this paper, a constraint-based satellite mission planning model is established based on the thought of constraint satisfaction. It includes target, request, observation, satellite, payload and other elements, with constraints linked up. The optimization goal of the model is to make full use of time and resources, and improve the efficiency of target observation. Greedy algorithm is used in the model solving to make observation plan and data transmission plan. Two simulation experiments are designed and carried out, which are routine monitoring of global forest fire and emergency monitoring of forest fires in Australia. The simulation results proved that the model and algorithm perform well. And the model is of good emergency response capability. Efficient and reasonable plan can be worked out to meet users' needs under complex cases of multiple payloads, multiple targets and variable priorities with this model.

  4. 36 CFR 219.12 - Monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...

  5. 36 CFR 219.12 - Monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...

  6. 36 CFR 219.12 - Monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Measurable changes on the plan area related to climate change and other stressors that may be affecting the.... Monitoring information should enable the responsible official to determine if a change in plan components or... relevant assumptions, tracking relevant changes, and measuring management effectiveness and progress toward...

  7. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... involvement of the responsible parties in the assessment; and (vii) A description of monitoring for.... (3) The monitoring component to the Draft Restoration Plan should address such factors as duration...

  8. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  9. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  10. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  11. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  12. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  13. 40 CFR 141.622 - Subpart V monitoring plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Subpart V monitoring plan. 141.622 Section 141.622 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Stage 2 Disinfection Byproducts Requirements § 141...

  14. A tentative discussion on the monitoring of water resources in China

    NASA Astrophysics Data System (ADS)

    Yang, Jianqing; Dai, Ning; Wu, Mengying; Wang, Guangsheng

    2016-10-01

    With the rapid economy development and social civilization progress, the Chinese Government also is improving ecological environmental conditions. More efforts have been made to solve water problems through the implementation of stringent water resources management, as a key government policy on water. Thus, monitoring of water resources has been strengthened, being a main component of the hydrological work in recent years. Compared with routine hydrological monitoring, water resources monitoring pays more attention to the quantity and quality variations of regional waters, to reflect the status of water in river basins and administrative regions. In this paper, the overall layout of the hydrometric network in China is presented, monitoring efforts of the natural water cycle and water consumptions are analyzed, methodologies of water resources monitoring, which are commonly applied in the country, are summed up. Taking the hydrometric network planning on interprovincial boundary waterbodies as example, a summary of the planning at interprovincial boundary river sections is presented. The planning can meet the need of water resources management of administrative divisions. It can also improve the overall water resources monitoring for the country.

  15. Essential Components of a Perimeter Air Monitoring Plan and Worker Protection Program at Sites Involving the Excavation of Naturally Occurring Asbestos (NOA) in California

    NASA Astrophysics Data System (ADS)

    Zdeb, T. F.

    2012-12-01

    Preparing a Perimeter Air Monitoring Plan that provides the essential information and methods of evaluation needed to assure that the health of the surrounding community is adequately protected and adapting currently existing Cal/OSHA regulations to be relevant to the protection of workers at sites involving the excavation of Naturally Occurring Asbestos (NOA) is oftentimes challenging in California. Current guidelines regarding what constitutes an effective air monitoring program are often lacking in details regarding what should be sampled and analyzed to characterize a site and what evaluation techniques should be applied to process the results of monitoring, and the current Cal/OSHA asbestos related regulations regarding worker protection are for the most part largely pertinent to the abatement of asbestos in buildings. An overview of the essential components of an effective Baseline and Perimeter Air Monitoring Plan will be presented that includes a brief discussion of the various asbestos types and fiber sizes that may need to be considered, possible approachs for evaluating temporal and spatial variability, review of selected site boundary target concentrations, and consideration of the potential for airborne dust and soil containing asbestos (and other contaminants) to migrate and accumulate offsite eventually contributing to "background creep" --the incremental increase of overall airborne asbestos concentrations in the areas surrounding the site due to the re-entrainment of asbestos from the settled dust and/or transported soil. In addition to the above, the current Cal/OSHA asbestos regulations related to worker protection will be briefly discussed with respect to their relevancy at NOA sites with an overview of the adaptations to the regulations that were developed as a result of some fairly lengthy discussions with representatives of Cal/OSHA. These adaptations include, among other things, defining how regulated areas (asbestos concentrations over 1%) and "provisionally regulated" areas (less than 1%) are established and treated, what variables need to be considered when attempting to complete a personal exposure assessment, Cal/OSHA Permissible Exposure Limits (PELs) versus site specific permissible exposure limits, allowable work practices, and the qualifications of personnel performing the sampling and analyses of data.

  16. Using Copernicus earth observation services to monitor climate change impacts and adaptations

    NASA Astrophysics Data System (ADS)

    Becker, Daniel; Zebisch, Marc; Sonnenschein, Ruth; Schönthaler, Konstanze; von Andrian-Werburg, Stefan

    2016-04-01

    In the last years, earth observation made a big leap towards an operational monitoring of the state of environment. Remote sensing provides for instance information on the dynamics, trends and anomalies of snow and glaciers, vegetation, soil moisture or water temperature. In particular, the European Copernicus initiative offers new opportunities through new satellites with a higher temporal and spatial resolution, operational services for environmental monitoring and an open data access policy. With the Copernicus climate change service and the ESA climate change initiative, specific earth observation programs are in place to address the impacts of climate change. However, such products and services are until now rarely picked up in the field of policy or decision making oriented climate impact or climate risk assessments. In this talk, we will present results of a study, which focus on the question, if and how remote sensing approaches could be integrated into operational monitoring activities of climate impacts and response measures on a national and subnational scale. We assessed all existing and planned Copernicus services regarding their relevance for climate impact monitoring by comparing them against the indication fields from an indicator system for climate impact and response monitoring in Germany, which has lately been developed in the framework of the German national adaptation strategy. For several climate impact or response indicators, an immediate integration of remote sensing data could be identified and been recommended. For these cases, we will show practical examples on the benefit of remote sensing data. For other indication fields, promising approaches were found, which need further development. We argue that remote sensing is a very valuable complement to the existing indicator schemes by contributing with spatial explicit, timely information but not always easy to integrate with classical approaches, which are oriented towards consistent long term monitoring. Furthermore, we provide specific recommendations for the Copernicus services to ensure a consistent climate change monitoring in future and we indicate options and limitations for integrating service products into practical assessment and monitoring activities.

  17. Building Software Agents for Planning, Monitoring, and Optimizing Travel

    DTIC Science & Technology

    2004-01-01

    defined as plans in the Theseus Agent Execution language (Barish et al. 2002). In the Web environment, sources can be quite slow and the latencies of...executor is based on a dataflow paradigm, actions are executed as soon as the data becomes available. Second, Theseus performs the actions in a...while Thesues provides an expressive language for defining information gathering and monitoring plans. The Theseus language supports capabilities

  18. TDRSS momentum unload planning

    NASA Technical Reports Server (NTRS)

    Cross, George R.; Potter, Mitchell A.; Whitehead, J. Douglass; Smith, James T.

    1991-01-01

    A knowledge-based system is described which monitors TDRSS telemetry for problems in the momentum unload procedure. The system displays TDRSS telemetry and commands in real time via X-windows. The system constructs a momentum unload plan which agrees with the preferences of the attitude control specialists and the momentum growth characteristics of the individual spacecraft. During the execution of the plan, the system monitors the progress of the procedure and watches for unexpected problems.

  19. An active monitoring method for flood events

    NASA Astrophysics Data System (ADS)

    Chen, Zeqiang; Chen, Nengcheng; Du, Wenying; Gong, Jianya

    2018-07-01

    Timely and active detecting and monitoring of a flood event are critical for a quick response, effective decision-making and disaster reduction. To achieve the purpose, this paper proposes an active service framework for flood monitoring based on Sensor Web services and an active model for the concrete implementation of the active service framework. The framework consists of two core components-active warning and active planning. The active warning component is based on a publish-subscribe mechanism implemented by the Sensor Event Service. The active planning component employs the Sensor Planning Service to control the execution of the schemes and models and plans the model input data. The active model, called SMDSA, defines the quantitative calculation method for five elements, scheme, model, data, sensor, and auxiliary information, as well as their associations. Experimental monitoring of the Liangzi Lake flood in the summer of 2010 is conducted to test the proposed framework and model. The results show that 1) the proposed active service framework is efficient for timely and automated flood monitoring. 2) The active model, SMDSA, is a quantitative calculation method used to monitor floods from manual intervention to automatic computation. 3) As much preliminary work as possible should be done to take full advantage of the active service framework and the active model.

  20. Volunteer water monitoring: A guide for state managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-08-01

    Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.

  1. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  2. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  3. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  4. PLANNING STUDY TO MODEL AND MONITOR COAL PILE RUNOFF. PHASE I

    EPA Science Inventory

    The report describes a planning study for predicting and monitoring the hydrologic and chemical characteristics of effluent streams resulting from precipitation impacting on open storage of coal. It includes: a survey of utilities on storage habits and treatment systems for coal ...

  5. 75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...

  6. An MRI guided system for prostate laser ablation with treatment planning and multi-planar temperature monitoring

    NASA Astrophysics Data System (ADS)

    Xu, Sheng; Agarwal, Harsh; Bernardo, Marcelino; Seifabadi, Reza; Turkbey, Baris; Partanen, Ari; Negussie, Ayele; Glossop, Neil; Choyke, Peter; Pinto, Peter; Wood, Bradford J.

    2016-03-01

    Prostate cancer is often over treated with standard treatment options which impact the patients' quality of life. Laser ablation has emerged as a new approach to treat prostate cancer while sparing the healthy tissue around the tumor. Since laser ablation has a small treatment zone with high temperature, it is necessary to use accurate image guidance and treatment planning to enable full ablation of the tumor. Intraoperative temperature monitoring is also desirable to protect critical structures from being damaged in laser ablation. In response to these problems, we developed a navigation platform and integrated it with a clinical MRI scanner and a side firing laser ablation device. The system allows imaging, image guidance, treatment planning and temperature monitoring to be carried out on the same platform. Temperature sensing phantoms were developed to demonstrate the concept of iterative treatment planning and intraoperative temperature monitoring. Retrospective patient studies were also conducted to show the clinical feasibility of the system.

  7. Development of a grazing monitoring program for Great Sand Dunes National Park, Colorado

    USGS Publications Warehouse

    Zeigenfuss, Linda C.; Schoenecker, Kathryn A.

    2015-08-07

    National parks in the United States face the difficult task of managing natural resources within park boundaries that are influenced to a large degree by historical land uses or by forces outside of the park’s protection and mandate. Among the many challenges faced by parks is management of wildlife populations that occupy larger landscapes than individual park units but that concentrate within park lands both seasonally and opportunistically. Great Sand Dunes National Park and Preserve in south-central Colorado is currently developing an Ungulate Management Plan to address management of elk and bison populations within the park. Execution of the Ungulate Management Plan will require monitoring and assessment of habitat conditions in areas that appear sensitive to ungulate use or heavily used by elk and bison. Several sources of information on the various habitats within the park and their use and response to foraging elk and bison exist from recent and on-going research in Great Sand Dunes National Park and Preserve as well as from studies in other regions of the Intermountain West. All of this data can be used to inform the planning process. This report provides background on vegetation types that make up the primary bison and elk ranges in Great Sand Dunes National Park and Preserve and on the potential effects of ungulate grazing and browsing in these specific vegetation communities (both locally and regionally). The report also provides a review of the elements necessary to develop a long-term monitoring program for Great Sand Dunes National Park and Preserve that addresses both the responses to ungulate herbivory seen in important habitats in the park and the amount and patterns of ungulate habitat use.

  8. Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry

    2003-06-09

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less

  9. Deep Stimulation at Newberry Volcano EGS Demonstration

    NASA Astrophysics Data System (ADS)

    Grasso, K.; Cladouhos, T. T.; Petty, S.; Garrison, G. H.; Nordin, Y.; Uddenberg, M.; Swyer, M.

    2014-12-01

    The Newberry Volcano EGS Demonstration is a 5 year field project designed to demonstrate recent technological advances for engineered geothermal systems (EGS) development. Advances in reservoir stimulation, diverter, and monitoring are being tested in a hot (>300 C), dry well (NWG 55-29) drilled in 2008. These technologies could reduce the cost of electrical power generation. The project began in 2010 with two years of permitting, technical planning, and development of a project-specific Induced Seismicity Mitigation Plan (ISMP), and is funded in part by the Department of Energy. In 2012, the well was hydraulically stimulated with water at pressures below the principle stress for 7 weeks, resulting in hydroshearing. The depth of stimulation was successfully shifted by injection of two pills of Thermally-degradable Zonal Isolation Materials (TZIMs). Injectivity changes, thermal profiles and seismicity indicate that fracture permeability in well NWG 55-29 was enhanced during stimulation. This work successfully demonstrated the viability of large-volume (40,000 m3), low-pressure stimulation coupled with non-mechanical diverter technology, and microseismic monitoring for reservoir mapping. Further analysis and field testing in 2013 indicates further stimulation will be required in order to develop an economically viable reservoir, and is scheduled in 2014. The 2014 stimulation will use improved stimulation and monitoring equipment, better knowledge based on 2012 outcomes, and create a deep EGS reservoir in the hottest part of the wellbore.

  10. SU-E-T-605: Performance Evaluation of MLC Leaf-Sequencing Algorithms in Head-And-Neck IMRT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jing, J; Lin, H; Chow, J

    2015-06-15

    Purpose: To investigate the efficiency of three multileaf collimator (MLC) leaf-sequencing algorithms proposed by Galvin et al, Chen et al and Siochi et al using external beam treatment plans for head-and-neck intensity modulated radiation therapy (IMRT). Methods: IMRT plans for head-and-neck were created using the CORVUS treatment planning system. The plans were optimized and the fluence maps for all photon beams determined. Three different MLC leaf-sequencing algorithms based on Galvin et al, Chen et al and Siochi et al were used to calculate the final photon segmental fields and their monitor units in delivery. For comparison purpose, the maximum intensitymore » of fluence map was kept constant in different plans. The number of beam segments and total number of monitor units were calculated for the three algorithms. Results: From results of number of beam segments and total number of monitor units, we found that algorithm of Galvin et al had the largest number of monitor unit which was about 70% larger than the other two algorithms. Moreover, both algorithms of Galvin et al and Siochi et al have relatively lower number of beam segment compared to Chen et al. Although values of number of beam segment and total number of monitor unit calculated by different algorithms varied with the head-and-neck plans, it can be seen that algorithms of Galvin et al and Siochi et al performed well with a lower number of beam segment, though algorithm of Galvin et al had a larger total number of monitor units than Siochi et al. Conclusion: Although performance of the leaf-sequencing algorithm varied with different IMRT plans having different fluence maps, an evaluation is possible based on the calculated number of beam segment and monitor unit. In this study, algorithm by Siochi et al was found to be more efficient in the head-and-neck IMRT. The Project Sponsored by the Fundamental Research Funds for the Central Universities (J2014HGXJ0094) and the Scientific Research Foundation for the Returned Overseas Chinese Scholars, State Education Ministry.« less

  11. On the effectiveness of ion range determination from in-beam PET data

    NASA Astrophysics Data System (ADS)

    Fiedler, Fine; Shakirin, Georgy; Skowron, Judith; Braess, Henning; Crespo, Paulo; Kunath, Daniela; Pawelke, Jörg; Pönisch, Falk; Enghardt, Wolfgang

    2010-04-01

    At present, in-beam positron emission tomography (PET) is the only method for in vivo and in situ range verification in ion therapy. At the GSI Helmholtzzentrum für Schwerionenforschung GmbH (GSI) Darmstadt, Germany, a unique in-beam PET installation has been operated from 1997 until the shut down of the carbon ion therapy facility in 2008. Therapeutic irradiation by means of 12C ion beams of more than 400 patients have been monitored. In this paper a first quantitative study on the accuracy of the in-beam PET method to detect range deviations between planned and applied treatment in clinically relevant situations using simulations based on clinical data is presented. Patient treatment plans were used for performing simulations of positron emitter distributions. For each patient a range difference of ± 6 mm in water was applied and compared to simulations without any changes. The comparisons were performed manually by six experienced evaluators for data of 81 patients. The number of patients required for the study was calculated using the outcome of a pilot study. The results indicate a sensitivity of (91 ± 3)% and a specificity of (96 ± 2)% for detecting an overrange, a reduced range is recognized with a sensitivity of (92 ± 3)% and a specificity of (96 ± 2)%. The positive and the negative predictive value of this method are 94% and 87%, respectively. The interobserver coefficient of variation is between 3 and 8%. The in-beam PET method demonstrated a high sensitivity and specificity for the detection of range deviations. As the range is a most indicative factor of deviations in the dose delivery, the promising results shown in this paper confirm the in-beam PET method as an appropriate tool for monitoring ion therapy.

  12. The role of complexity metrics in a multi-institutional dosimetry audit of VMAT

    PubMed Central

    Agnew, Christina E; Hussein, Mohammad; Tsang, Yatman; McWilliam, Alan; Hounsell, Alan R; Clark, Catharine H

    2016-01-01

    Objective: To demonstrate the benefit of complexity metrics such as the modulation complexity score (MCS) and monitor units (MUs) in multi-institutional audits of volumetric-modulated arc therapy (VMAT) delivery. Methods: 39 VMAT treatment plans were analysed using MCS and MU. A virtual phantom planning exercise was planned and independently measured using the PTW Octavius® phantom and seven29® 2D array (PTW-Freiburg GmbH, Freiburg, Germany). MCS and MU were compared with the median gamma index pass rates (2%/2 and 3%/3 mm) and plan quality. The treatment planning systems (TPS) were grouped by VMAT modelling being specifically designed for the linear accelerator manufacturer's own treatment delivery system (Type 1) or independent of vendor for VMAT delivery (Type 2). Differences in plan complexity (MCS and MU) between TPS types were compared. Results: For Varian® linear accelerators (Varian® Medical Systems, Inc., Palo Alto, CA), MCS and MU were significantly correlated with gamma pass rates. Type 2 TPS created poorer quality, more complex plans with significantly higher MUs and MCS than Type 1 TPS. Plan quality was significantly correlated with MU for Type 2 plans. A statistically significant correlation was observed between MU and MCS for all plans (R = −0.84, p < 0.01). Conclusion: MU and MCS have a role in assessing plan complexity in audits along with plan quality metrics. Plan complexity metrics give some indication of plan deliverability but should be analysed with plan quality. Advances in knowledge: Complexity metrics were investigated for a national rotational audit involving 34 institutions and they showed value. The metrics found that more complex plans were created for planning systems which were independent of vendor for VMAT delivery. PMID:26511276

  13. The role of complexity metrics in a multi-institutional dosimetry audit of VMAT.

    PubMed

    McGarry, Conor K; Agnew, Christina E; Hussein, Mohammad; Tsang, Yatman; McWilliam, Alan; Hounsell, Alan R; Clark, Catharine H

    2016-01-01

    To demonstrate the benefit of complexity metrics such as the modulation complexity score (MCS) and monitor units (MUs) in multi-institutional audits of volumetric-modulated arc therapy (VMAT) delivery. 39 VMAT treatment plans were analysed using MCS and MU. A virtual phantom planning exercise was planned and independently measured using the PTW Octavius(®) phantom and seven29(®) 2D array (PTW-Freiburg GmbH, Freiburg, Germany). MCS and MU were compared with the median gamma index pass rates (2%/2 and 3%/3 mm) and plan quality. The treatment planning systems (TPS) were grouped by VMAT modelling being specifically designed for the linear accelerator manufacturer's own treatment delivery system (Type 1) or independent of vendor for VMAT delivery (Type 2). Differences in plan complexity (MCS and MU) between TPS types were compared. For Varian(®) linear accelerators (Varian(®) Medical Systems, Inc., Palo Alto, CA), MCS and MU were significantly correlated with gamma pass rates. Type 2 TPS created poorer quality, more complex plans with significantly higher MUs and MCS than Type 1 TPS. Plan quality was significantly correlated with MU for Type 2 plans. A statistically significant correlation was observed between MU and MCS for all plans (R = -0.84, p < 0.01). MU and MCS have a role in assessing plan complexity in audits along with plan quality metrics. Plan complexity metrics give some indication of plan deliverability but should be analysed with plan quality. Complexity metrics were investigated for a national rotational audit involving 34 institutions and they showed value. The metrics found that more complex plans were created for planning systems which were independent of vendor for VMAT delivery.

  14. Bangladesh policy on prevention and control of non-communicable diseases: a policy analysis.

    PubMed

    Biswas, Tuhin; Pervin, Sonia; Tanim, Md Imtiaz Alam; Niessen, Louis; Islam, Anwar

    2017-06-19

    This paper is aimed at critically assessing the extent to which Non-Communicable Disease NCD-related policies introduced in Bangladesh align with the World Health Organization's (WHO) 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. The authors reviewed all relevant policy documents introduced by the Government of Bangladesh since its independence in 1971. The literature review targeted scientific and grey literature documents involving internet-based search, and expert consultation and snowballing to identify relevant policy documents. Information was extracted from the documents using a specific matrix, mapping each document against the six objectives of the WHO 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. A total of 51 documents were identified. Seven (14%) were research and/or surveys, nine were on established policies (17%), while seventeen (33%) were on action programmes. Five (10%) were related to guidelines and thirteen (25%) were strategic planning documents from government and non-government agencies/institutes. The study covered documents produced by the Government of Bangladesh as well as those by quasi-government and non-government organizations irrespective of the extent to which the intended policies were implemented. The policy analysis findings suggest that although the government has initiated many NCD-related policies or programs, they lacked proper planning, implementation and monitoring. Consequently, Bangladesh over the years had little success in effectively addressing the growing burden of non-communicable diseases. It is imperative that future research critically assess the effectiveness of national NCD policies by monitoring their implementation and level of population coverage.

  15. A Markov model for planning and permitting offshore wind energy: A case study of radio-tracked terns in the Gulf of Maine, USA.

    PubMed

    Cranmer, Alexana; Smetzer, Jennifer R; Welch, Linda; Baker, Erin

    2017-05-15

    Quantifying and managing the potential adverse wildlife impacts of offshore wind energy is critical for developing offshore wind energy in a sustainable and timely manner, but poses a significant challenge, particularly for small marine birds that are difficult to monitor. We developed a discrete-time Markov model of seabird movement around a colony site parameterized by automated radio telemetry data from common terns (Sterna hirundo) and Arctic terns (S. paradisaea), and derived impact functions that estimate the probability of collision fatality as a function of the distance and bearing of wind turbines from a colony. Our purpose was to develop and demonstrate a new, flexible tool that can be used for specific management and wind-energy planning applications when adequate data are available, rather than inform wind-energy development at this site. We demonstrate how the tool can be used 1) in marine spatial planning exercises to quantitatively identify setback distances under development scenarios given a risk threshold, 2) to examine the ecological and technical trade-offs of development alternatives to facilitate negotiation between objectives, and 3) in the U.S. National Environmental Policy Act (NEPA) process to estimate collision fatality under alternative scenarios. We discuss model limitations and data needs, and highlight opportunities for future model extension and development. We present a highly flexible tool for wind energy planning that can be easily extended to other central place foragers and data sources, and can be updated and improved as new monitoring data arises. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. 40 CFR 413.03 - Monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standard for total toxic organics (TTO), I certify that, to the best of my knowledge and belief, no dumping... monitoring report. I further certify that this facility is implementing the toxic organic management plan... POTWs shall submit a toxic organic management plan that specifies to the control authority's...

  17. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with the permit limitation for total toxic organics (TTO), I certify that, to the best of my knowledge... management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to the permitting...

  18. A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases.

    PubMed

    Narayanasamy, Ganesh; Stathakis, Sotirios; Gutierrez, Alonso N; Pappas, Evangelos; Crownover, Richard; Floyd, John R; Papanikolaou, Niko

    2017-10-01

    In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R 50% ), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R 50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 ( P < .05). For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V 12 Gy but required significantly lower monitor units, when compared to RapidArc plans.

  19. A Systematic Analysis of 2 Monoisocentric Techniques for the Treatment of Multiple Brain Metastases

    PubMed Central

    Stathakis, Sotirios; Gutierrez, Alonso N.; Pappas, Evangelos; Crownover, Richard; Floyd, John R.; Papanikolaou, Niko

    2016-01-01

    Background: In this treatment planning study, we compare the plan quality and delivery parameters for the treatment of multiple brain metastases using 2 monoisocentric techniques: the Multiple Metastases Element from Brainlab and the RapidArc volumetric-modulated arc therapy from Varian Medical Systems. Methods: Eight patients who were treated in our institution for multiple metastases (3-7 lesions) were replanned with Multiple Metastases Element using noncoplanar dynamic conformal arcs. The same patients were replanned with the RapidArc technique in Eclipse using 4 noncoplanar arcs. Both techniques were designed using a single isocenter. Plan quality metrics (conformity index, homogeneity index, gradient index, and R50%), monitor unit, and the planning time were recorded. Comparison of the Multiple Metastases Element and RapidArc plans was performed using Shapiro-Wilk test, paired Student t test, and Wilcoxon signed rank test. Results: A paired Wilcoxon signed rank test between Multiple Metastases Element and RapidArc showed comparable plan quality metrics and dose to brain. Mean ± standard deviation values of conformity index were 1.8 ± 0.7 and 1.7 ± 0.6, homogeneity index were 1.3 ± 0.1 and 1.3 ± 0.1, gradient index were 5.0 ± 1.8 and 5.1 ± 1.9, and R50% were 4.9 ± 1.8 and 5.0 ± 1.9 for Multiple Metastases Element and RapidArc plans, respectively. Mean brain dose was 2.3 and 2.7 Gy for Multiple Metastases Element and RapidArc plans, respectively. The mean value of monitor units in Multiple Metastases Element plan was 7286 ± 1065, which is significantly lower than the RapidArc monitor units of 9966 ± 1533 (P < .05). Conclusion: For the planning of multiple brain lesions to be treated with stereotactic radiosurgery, Multiple Metastases Element planning software produced equivalent conformity, homogeneity, dose falloff, and brain V12 Gy but required significantly lower monitor units, when compared to RapidArc plans. PMID:27612917

  20. Structure, Intent and Conformance Monitoring in ATC

    NASA Technical Reports Server (NTRS)

    Reynolds, Tom G.; Histon, Jonathan M.; Davison, Hayley J.; Hansman, R. John

    2004-01-01

    Infield studies of current Air Traffic Control operations it is found that controllers rely on underlying airspace structure to reduce the complexity of the planning and conformance monitoring tasks. The structure appears to influence the controller's working mental model through abstractions that reduce the apparent cognitive complexity. These structure-based abstractions are useful for the controller's key tasks of planning, implementing, monitoring, and evaluating tactical situations. In addition, the structure-based abstractions appear to be important in the maintenance of Situation Awareness. The process of conformance monitoring is analyzed in more detail and an approach to conformance monitoring which utilizes both the structure-based abstractions and intent is presented.

  1. The national response for preventing healthcare-associated infections: data and monitoring.

    PubMed

    Kahn, Katherine L; Weinberg, Daniel A; Leuschner, Kristin J; Gall, Elizabeth M; Siegel, Sari; Mendel, Peter

    2014-02-01

    Historically, the ability to accurately track healthcare-associated infections (HAIs) was hindered due to a lack of coordination among data sources and shortcomings in individual data sources. This paper presents the results of the evaluation of the HAI data and the monitoring component of the Action Plan, focusing on context (goals), inputs, and processes. We used the Content-Input-Process-Product framework, together with the HAI prevention system framework, to describe the transformative processes associated with data and monitoring efforts. Six HAI priority conditions in the 2009 Action Plan created a focus for the selection of goals and activities. Key Action Plan decisions included a phased-in data and monitoring approach, commitment to linking the selection of priority HAIs to highly visible national 5-year prevention targets, and the development of a comprehensive HAI database inventory. Remaining challenges relate to data validation, resources, and the opportunity to integrate electronic health and laboratory records with other provider data systems. The Action Plan's data and monitoring program has developed a sound infrastructure that builds upon technological advances and embodies a firm commitment to prioritization, coordination and alignment, accountability and incentives, stakeholder engagement, and an awareness of the need for predictable resources. With time, and adequate resources, it is likely that the investment in data-related infrastructure during the Action Plan's initial years will reap great rewards.

  2. The Imperial County Community Air Monitoring Network: A Model for Community-based Environmental Monitoring for Public Health Action

    PubMed Central

    Olmedo, Luis; Bejarano, Ester; Lugo, Humberto; Murillo, Eduardo; Seto, Edmund; Wong, Michelle; King, Galatea; Wilkie, Alexa; Meltzer, Dan; Carvlin, Graeme; Jerrett, Michael; Northcross, Amanda

    2017-01-01

    Summary: The Imperial County Community Air Monitoring Network (the Network) is a collaborative group of community, academic, nongovernmental, and government partners designed to fill the need for more detailed data on particulate matter in an area that often exceeds air quality standards. The Network employs a community-based environmental monitoring process in which the community and researchers have specific, well-defined roles as part of an equitable partnership that also includes shared decision-making to determine study direction, plan research protocols, and conduct project activities. The Network is currently producing real-time particulate matter data from 40 low-cost sensors throughout Imperial County, one of the largest community-based air networks in the United States. Establishment of a community-led air network involves engaging community members to be citizen-scientists in the monitoring, siting, and data collection process. Attention to technical issues regarding instrument calibration and validation and electronic transfer and storage of data is also essential. Finally, continued community health improvements will be predicated on facilitating community ownership and sustainability of the network after research funds have been expended. https://doi.org/10.1289/EHP1772 PMID:28886604

  3. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1993 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, Lynette A.; Graves, Ritchie J.; Killins, Susan D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basinmore » juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis.« less

  4. Development and Application of a ZigBee-Based Building Energy Monitoring and Control System

    PubMed Central

    Peng, Changhai

    2014-01-01

    Increasing in energy consumption, particularly with the ever-increasing growth and development of urban systems, has become a major concern in most countries. In this paper, the authors propose a cost-effective ZigBee-based building energy monitoring and control system (ZBEMCS), which is composed of a gateway, a base station, and sensors. Specifically, a new hardware platform for power sensor nodes is developed to perform both local/remote power parameter measurement and power on/off switching for electric appliances. The experimental results show that the ZBEMCS can easily monitor energy usage with a high level of accuracy. Two typical applications of ZBEMCS such as subentry metering and household metering of building energy are presented. The former includes lighting socket electricity, HVAC electricity, power electricity and special electricity. The latter includes household metering according to the campus's main function zone and each college or department. Therefore, this system can be used for energy consumption monitoring, long-term energy conservation planning, and the development of automated energy conservation for building applications. PMID:25254249

  5. Development and application of a ZigBee-based building energy monitoring and control system.

    PubMed

    Peng, Changhai; Qian, Kun

    2014-01-01

    Increasing in energy consumption, particularly with the ever-increasing growth and development of urban systems, has become a major concern in most countries. In this paper, the authors propose a cost-effective ZigBee-based building energy monitoring and control system (ZBEMCS), which is composed of a gateway, a base station, and sensors. Specifically, a new hardware platform for power sensor nodes is developed to perform both local/remote power parameter measurement and power on/off switching for electric appliances. The experimental results show that the ZBEMCS can easily monitor energy usage with a high level of accuracy. Two typical applications of ZBEMCS such as subentry metering and household metering of building energy are presented. The former includes lighting socket electricity, HVAC electricity, power electricity and special electricity. The latter includes household metering according to the campus's main function zone and each college or department. Therefore, this system can be used for energy consumption monitoring, long-term energy conservation planning, and the development of automated energy conservation for building applications.

  6. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  7. Execution monitoring for a mobile robot system

    NASA Technical Reports Server (NTRS)

    Miller, David P.

    1990-01-01

    Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.

  8. Dimethyl Disulfide (DMDS) Fumigant Management Plan Template Phase 2

    EPA Pesticide Factsheets

    These templates provide a framework for developing your FMP, including sections on your supervising pesticide applicator, buffer zones, emergency response plan, handler information, tarp plan, soil conditions, signage, and air monitoring plan.

  9. [Compliance with guidelines by state plans for food and nutritional security in Brazil].

    PubMed

    Machado, Mick Lennon; Gabriel, Cristine Garcia; Soar, Claudia; Mamed, Gisele Rockenbach; Machado, Patrícia Maria de Oliveira; Lacerda, Josimari Telino de; Martins, Milena Corrêa; Marcon, Maria Cristina

    2018-02-05

    A descriptive and documental study was performed from August to October 2016 to analyze compliance by state plans for food and nutritional security (PlanSAN) with the guidelines set by the Brazilian National Policy for Food and Nutritional Security (PNSAN). The state plans were accessed via the websites of the Inter-Ministerial Chamber for Food and Nutritional Security (CAISAN) or the state governments, plus complementary data collection at the state level. All the states of Brazil joined the National System for Food and Nutritional Security (SISAN), while fewer than half (13 states, 48%) had drafted their plans. Of these, 5 (38%) of the PlanSAN had schedules that coincided with the same state's pluriannual plan, 5 (38%) of the PlanSAN specified the budget requirements for meeting the proposed targets, 7 (54%) specified mechanisms for monitoring the plan, and only 2 (15%) defined methodologies for monitoring food and nutritional security. The recent existence of (and adherence to) the CAISAN appear to be related to the lack of state plans in half the states. Although most of the states that did have plans met some of the guidelines laid out by the PNSAN, these mechanisms become weak and impractical when they lack earmarked budget funds to meet their targets. Since the PNSAN is structurally inter-sectorial, the development of plans requires collective work by various government departments. Importantly, the items analyzed here are all guidelines, which implies the need for mechanisms to monitor their actual implementation.

  10. Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.

    2001-07-01

    The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematicmore » application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.« less

  11. Evaluation of Critical Care Monitor Technology During the US Navy Strong Angel Exercise

    NASA Technical Reports Server (NTRS)

    Johannesen, John; Rasbury, Jack

    2003-01-01

    The NASA critical path road map identifies "trauma and acute medical problems" as a clinical capability risk category (http://criticalDath.isc.nasa.gov). Specific risks include major trauma, organ laceration or contusion, hemoperitoneum, pulmonary failure, pneumo- and hemothorax, burn, open bone fracture, blunt head trauma, and penetrating injury. Mitigation of these risks includes the capability for critical care monitoring. Currently, the International Space Station (ISS) Crew Health Care System (CHeCS) does not provide such a capability. The Clinical Space Medicine Strategic Planning Forum (4/8/97), sponsored by NASA Medical Operations, identified the development of trauma care capabilities as one of the top priorities for space medicine. The Clinical Care Capability Development Project (CCCDP) subsequently undertook the task to address this need.

  12. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclearmore » Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.« less

  13. An assessment of a traffic monitoring system for a major traffic generator to improve regional planning : final presentation.

    DOT National Transportation Integrated Search

    2008-08-01

    Report Abstract: : The purpose of this guide is to aid the Texas Department of Transportation (TxDOT), Metropolitan Planning Organizations (MPO), and other state and local agencies to develop an effective traffic monitoring system for new major traff...

  14. 40 CFR 52.70 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...

  15. 40 CFR 52.70 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... nonattainment areas submitted by the Governor of Alaska on January 18, 1980 as follows: Volume II. Analysis of...: Volume II. Analysis of Problems, Control Actions Section V. Ambient Air Monitoring A. Purpose C. Air Monitoring Network E. Annual Review (9) Provisions of a State Air Quality Control Plan submitted by the...

  16. 77 FR 20217 - Secondary National Ambient Air Quality Standards for Oxides of Nitrogen and Sulfur

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-03

    ... Planning and Standards (OAQPS), U.S. Environmental Protection Agency, Mail Code C504-06, Research Triangle... of Research 3. Implementation Challenges 4. Monitoring Plan Development and Stakeholder Participation B. Summary of Proposed Evaluation of Monitoring Methods C. Comments on Field Pilot Program and...

  17. Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round

    EPA Science Inventory

    Test/QA Plan for Verification of Semi-Continuous Ambient Air Monitoring Systems - Second Round. Changes reflect performance of second round of testing at new location and with various changes to personnel. Additional changes reflect general improvements to the Version 1 test/QA...

  18. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  19. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  20. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  1. 20 CFR 653.108 - State agency self-monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... wrap-up sessions with the local office manager and staff to discuss any obvious findings and offer.... (5) The local office manager shall develop and propose a written corrective action plan. The plan... 658.400 et seq. The State MSFW Monitor Advocate shall review the local office managers' informal...

  2. 40 CFR 62.14453 - What must I monitor?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What must I monitor? 62.14453 Section 62.14453 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste...

  3. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability and Meetings... amended, NOAA is soliciting public comment on the draft management plan and draft environmental assessment... draft environmental assessment will be considered if received on or before June 22, 2012. Public...

  4. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...

  5. Monitoring and Assuring the Quality of Digital Aerial Data

    NASA Technical Reports Server (NTRS)

    Christopherson, Jon

    2007-01-01

    This viewgraph presentation explains the USGS plan for monitoring and assuring the quality of digital aerial data. The contents include: 1) History of USGS Aerial Imaging Involvement; 2) USGS Research and Results; 3) Outline of USGS Quality Assurance Plan; 4) Other areas of Interest; and 5) Summary

  6. MO-D-BRB-02: SBRT Treatment Planning and Delivery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, Y.

    2016-06-15

    Increased use of SBRT and hypofractionation in radiation oncology practice has posted a number of challenges to medical physicist, ranging from planning, image-guided patient setup and on-treatment monitoring, to quality assurance (QA) and dose delivery. This symposium is designed to provide current knowledge necessary for the safe and efficient implementation of SBRT in various linac platforms, including the emerging digital linacs equipped with high dose rate FFF beams. Issues related to 4D CT, PET and MRI simulations, 3D/4D CBCT guided patient setup, real-time image guidance during SBRT dose delivery using gated/un-gated VMAT/IMRT, and technical advancements in QA of SBRT (inmore » particular, strategies dealing with high dose rate FFF beams) will be addressed. The symposium will help the attendees to gain a comprehensive understanding of the SBRT workflow and facilitate their clinical implementation of the state-of-art imaging and planning techniques. Learning Objectives: Present background knowledge of SBRT, describe essential requirements for safe implementation of SBRT, and discuss issues specific to SBRT treatment planning and QA. Update on the use of multi-dimensional and multi-modality imaging for reliable guidance of SBRT. Discuss treatment planning and QA issues specific to SBRT. Provide a comprehensive overview of emerging digital linacs and summarize the key geometric and dosimetric features of the new generation of linacs for substantially improved SBRT. NIH/NCI; Varian Medical Systems; F. Yin, Duke University has a research agreement with Varian Medical Systems. In addition to research grant, I had a technology license agreement with Varian Medical Systems.« less

  7. 1993 Annual Report: San Francisco estuary regional monitoring program for trace substances

    USGS Publications Warehouse

    Thompson, B.; Lacy, Jessica; Hardin, Dane; Grovhaug, Tom; Taberski, K.; Jassby, Alan D.; Cloern, James E.; Caffrey, J.; Cole, B.; Schoellhamer, David H.

    1993-01-01

    Summaries of other monitoring activities pertinent to regional monitoring are also included in the Report: a description of the Regional Board’s Bay Protection Studies, the Sacramento Coordinated Monitoring Program, and a wetlands monitoring plan are included.

  8. Heat stress management program improving worker health and operational effectiveness: a case study.

    PubMed

    Huss, Rosalyn G; Skelton, Scott B; Alvis, Kimberly L; Shane, Leigh A

    2013-03-01

    Heat stress monitoring is a vital component of an effective health and safety program when employees work in exceptionally warm environments. Workers at hazardous waste sites often wear personal protective equipment (PPE), which increases the body heat stress load. No specific Occupational Safety and Health Administration (OSHA) regulations address heat stress; however, OSHA does provide several guidance documents to assist employers in addressing this serious workplace health hazard. This article describes a heat stress and surveillance plan implemented at a hazardous waste site as part of the overall health and safety program. The PPE requirement for work at this site, coupled with extreme environmental temperatures, made heat stress a significant concern. Occupational health nurses and industrial hygienists developed a monitoring program for heat stress designed to prevent the occurrence of significant heat-related illness in site workers. The program included worker education on the signs of heat-related illness and continuous physiologic monitoring to detect early signs of heat-related health problems. Biological monitoring data were collected before workers entered the exclusion zone and on exiting the zone following decontamination. Sixty-six site workers were monitored throughout site remediation. More than 1,700 biological monitoring data points were recorded. Outcomes included improved worker health and safety, and increased operational effectiveness. Copyright 2013, SLACK Incorporated.

  9. 3D conformal planning using low segment multi-criteria IMRT optimization

    PubMed Central

    Khan, Fazal; Craft, David

    2014-01-01

    Purpose To evaluate automated multicriteria optimization (MCO) – designed for intensity modulated radiation therapy (IMRT), but invoked with limited segmentation – to efficiently produce high quality 3D conformal radiation therapy (3D-CRT) plans. Methods Ten patients previously planned with 3D-CRT to various disease sites (brain, breast, lung, abdomen, pelvis), were replanned with a low-segment inverse multicriteria optimized technique. The MCO-3D plans used the same beam geometry of the original 3D plans, but were limited to an energy of 6 MV. The MCO-3D plans were optimized using fluence-based MCO IMRT and then, after MCO navigation, segmented with a low number of segments. The 3D and MCO-3D plans were compared by evaluating mean dose for all structures, D95 (dose that 95% of the structure receives) and homogeneity indexes for targets, D1 and clinically appropriate dose volume objectives for individual organs at risk (OARs), monitor units (MUs), and physician preference. Results The MCO-3D plans reduced the OAR mean doses (41 out of a total of 45 OARs had a mean dose reduction, p<<0.01) and monitor units (seven out of ten plans have reduced MUs; the average reduction is 17%, p=0.08) while maintaining clinical standards on coverage and homogeneity of target volumes. All MCO-3D plans were preferred by physicians over their corresponding 3D plans. Conclusion High quality 3D plans can be produced using MCO-IMRT optimization, resulting in automated field-in-field type plans with good monitor unit efficiency. Adopting this technology in a clinic could improve plan quality, and streamline treatment plan production by utilizing a single system applicable to both IMRT and 3D planning. PMID:25413405

  10. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less

  11. Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric

    2005-10-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluatemore » the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin developed with the efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha) coho salmon and (O. kisutch) and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (BOR 1988). The most notable development was the construction and operation of Three-Mile Falls Dam (3MD) and other irrigation projects that dewatered the Umatilla River during salmon migrations. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and the Oregon Department of Fish and Wildlife (ODFW) developed the Umatilla Hatchery Master Plan to restore the historical fisheries in the basin. The plan was completed in 1990 and included the following objectives: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Produce almost 48,000 adult returns to Three-Mile Falls Dam. The goals were reviewed in 1999 and were changed to 31,500 adult salmon and steelhead returns (Table 2). We conduct core long-term monitoring activities each year as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), genetic monitoring (Currens & Schreck 1995, Narum et al. 2004), and habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998). Our project goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. This is the only project that monitors the restoration of naturally producing salmon and steelhead in the basin.« less

  12. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench beganmore » in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.« less

  13. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee

    2003-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  14. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2004-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  15. NICMOS Cycles 13 and 14 Calibration Plans

    NASA Astrophysics Data System (ADS)

    Arribas, Santiago; Bergeron, Eddie; de Jong, Roeof; Malhotra, Sangeeta; Mobasher, Bahram; Noll, Keith; Schultz, Al; Wiklind, Tommy; Xu, Chun

    2005-11-01

    This document summarizes the NICMOS Calibration Plans for Cycles 13 and 14. These plans complement the SMOV3b, the Cycle 10 (interim), and the Cycles 11 and 12 (regular) calibration programs executed after the installation of the NICMOS Cooling System (NCS).. These previous programs have shown that the instrument is very stable, which has motivated a further reduction in the frequency of the monitoring programs for Cycle 13. In addition, for Cycle 14 some of these programs were slightly modified to account for 2 Gyro HST operations. The special calibrations on Cycle 13 were focussed on a follow up of the spectroscopic recalibration initiated in Cycle 12. This program led to the discovery of a possible count rate non-linearity, which has triggered a special program for Cycle 13 and a number of subsequent tests and calibrations during Cycle 14. At the time of writing this is a very active area of research. We also briefly comment on other calibrations defined to address other specific issues like: the autoreset test, the SPAR sequences tests, and the low-frequency flat residual for NIC1. The calibration programs for the 2-Gyro campaigns are not included here, since they have been described somewhere else. Further details and updates on specific programs can be found via the NICMOS web site.

  16. 40 CFR 130.9 - Designation and de-designation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...

  17. Lunar and Mars Exploration: The Autonomy Factor

    NASA Technical Reports Server (NTRS)

    Rando, Cynthia M.; Schuh, Susan V.

    2008-01-01

    Long duration space flight crews have relied heavily on almost constant communication with ground control mission support. Ground control teams provide vehicle status and system monitoring, while offering near real time support for specific tasks, emergencies, and ensuring crew health and well being. With extended exploration goals to lunar and Mars outposts, real time communication with ground control teams and the ground s ability to conduct mission monitoring will be very limited compared to the resources provided to current International Space Station (ISS) crews. An operational shift toward more autonomy and a heavier reliance on the crew to monitor their vehicle and operations will be required for these future missions. NASA s future exploration endeavors and the subsequent increased autonomy will require a shift in crew skill composition, i.e. engineer, doctor, mission specialist etc. and lead to new training challenges and mission scenarios. Specifically, operational and design changes will be necessary in many areas including: Habitat Infrastructure and Support Systems, Crew Composition, Training, Procedures and Mission Planning. This paper will specifically address how to apply ISS lessons learned to further use ISS as a test bed to address decreased amounts of ground support to achieve full autonomous operations for lunar and Mars missions. Understanding these lessons learned and applying them to current operations will help to address the future impacts of increased crew autonomy for the lunar and Mars outposts and pave the way for success in increasingly longer mission durations.

  18. High priority needs for range-wide monitoring of North American landbirds

    USGS Publications Warehouse

    Dunn, Erica H.; Altman, B.L.; Bart, J.; Beardmore, C.J.; Berlanga, H.; Blancher, P.J.; Butcher, G.S.; Demarest, D.W.; Dettmers, R.; Hunter, W.C.; Iñigo-Elias, Eduardo E.; Panjabi, A.O.; Pashley, D.N.; Ralph, C.J.; Rich, T.D.; Rosenberg, K.V.; Rustay, C.M.; Ruth, J.M.; Will, T.C.

    2005-01-01

    This document is an extension of work done for the Partners in Flight North American Landbird Conservation Plan (Rich et al. 2004). The Continental Plan reviewed conservation status of the 448 native landbird species that regularly breed in the United States and Canada. Two groups of species were identified as having high conservation importance: the PIF Watch List, made up of species for which there is conservation concern, and Stewardship Spices that are particularly characteristic of regional avifaunas. In addition, continental scale monitoring needs were identified for all species. Here we extend the monitoring needs aspect of the Plan, providing additional detail and suggesting the best means of filling the gaps in broad-scale, long-term trend monitoring. This analysis and report was compiled by the Partners in Flight (PIF) Science Committee as a contribution to current work by the North American Bird Conservation Initiative to assess the status of bird population monitoring in North America and to make recommendations for improvements.

  19. Ageing management of french NPP civil work structures

    NASA Astrophysics Data System (ADS)

    Gallitre, E.; Dauffer, D.

    2011-04-01

    This paper presents EDF practice about concrete structure ageing management, from the mechanisms analysis to the formal procedure which allows the French company to increase 900 MWe NPP lifetime until 40 years; it will also introduce its action plan for 60 years lifetime extension. This practice is based on a methodology which identifies every ageing mechanism; both plants feedback and state of the art are screened and conclusions are drawn up into an "ageing analysis data sheet". That leads at first to a collection of 57 data sheets which give the mechanism identification, the components that are concerned and an analysis grid which is designed to assess the safety risk. This analysis screens the reference documents describing the mechanism, the design lifetime hypotheses, the associated regulation or codification, the feedback experiences, the accessibility, the maintenance actions, the repair possibility and so one. This analysis has to lead to a conclusion about the risk taking into account monitoring and maintenance. If the data sheet conclusion is not clear enough, then a more detailed report is launched. The technical document which is needed, is a formal detailed report which summarizes every theoretical knowledge and monitoring data: its objective is to propose a solution for ageing management: this solution can include more inspections or specific research development, or additional maintenance. After a first stage on the 900 MWe units, only two generic ageing management detailed reports have been needed for the civil engineering part: one about reactor building containment, and one about other structures which focuses on concrete inflating reactions. The second stage consists on deriving this generic analysis (ageing mechanism and detailed reports) to every plant where a complete ageing report is required (one report for all equipments and structures of the plant, but specific for each reactor). This ageing management is a continuous process because the 57 generic data sheets set is updated every year and the detailed generic reports every five years. After this 40 year lifetime extension, EDF is preparing a 60 years lifetime action plan which includes R&D actions, specific industrial studies and also monitoring improvements.

  20. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  1. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  2. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  3. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  4. 40 CFR 265.278 - Unsaturated zone (zone of aeration) monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... soils nearby; this background monitoring must be conducted before or in conjunction with the monitoring... a minimum: (1) Soil monitoring using soil cores, and (2) Soil-pore water monitoring using devices... demonstrate in his unsaturated zone monitoring plan that: (1) The depth at which soil and soil-pore water...

  5. Assessment of the Monitor Unit Objective tool for VMAT in the Eclipse treatment planning system.

    PubMed

    Jiménez-Puertas, Sara; Sánchez-Artuñedo, David; Hermida-López, Marcelino

    2018-01-01

    This work aims to achieve the highest possible monitor units (MU) reduction using the MU Objective tool included in the Eclipse treatment planning system, while preserving the plan quality. The treatment planning system Eclipse (Varian Medical Systems, Palo Alto, CA) includes a control mechanism for the number of monitor units of volumetric modulated arc therapy (VMAT) plans, named the MU Objective tool. Forty prostate plans, 20 gynecological plans and 20 head and neck plans designed with VMAT were retrospectively studied. Each plan ( base plan ) was optimized without using the MU Objective tool, and it was re-optimized with different values of the Maximum MU ( MaxMU ) parameter of the MU Objective tool. MU differences were analyzed with a paired samples t -test and changes in plan quality were assessed with a set of parameters for OARs and PTVs. The average relative MU difference [Formula: see text] considering all treatment sites, was the highest when MaxMU  = 400 (-4.2%, p  < 0.001). For prostate plans, the lowest [Formula: see text] was obtained (-3.7%, p  < 0.001). For head and neck plans [Formula: see text] was -7.3% ( p  < 0.001) and for gynecological plans [Formula: see text] was 7.0% ( p  = 0.002). Although similar MU reductions were observed for both sites, for some gynecological plans maximum differences were greater than 10%. All the assessed parameters for PTVs and OARs sparing showed average differences below 2%. For the three studied clinical sites, establishing MaxMU  = 400 led to the optimum MU reduction, maintaining the original dose distribution and dosimetric parameters practically unaltered.

  6. Nonprofit to for-profit conversions by hospitals, health insurers, and health plans.

    PubMed Central

    Needleman, J

    1999-01-01

    Conversion of hospitals, health insurers, and health plans from nonprofit to for-profit ownership has become a focus of national debate. The author examines why nonprofit ownership has been dominant in the US health system and assesses the strength of the argument that nonprofits provide community benefits that would be threatened by for-profit conversion. The author concludes that many of the specific community benefits offered by nonprofits, such as care for the poor, could be maintained or replaced by adequate funding of public programs and that quality and fairness in treatment can be better assured through clear standards of care and adequate monitoring systems. As health care becomes increasingly commercialized, the most difficult parts of nonprofits' historic mission to preserve are the community orientation, leadership role, and innovation that nonprofit hospitals and health plans have provided out of their commitment to a community beyond those to whom they sell services. Images p109-a p110-a p115-a p116-a PMID:10199712

  7. Seismic intensity monitoring: from mature basins in the North Sea to sample-scale porosity measurements.

    NASA Astrophysics Data System (ADS)

    De Siena, Luca; Sketsiou, Panayiota

    2017-04-01

    We plan the application of a joint velocity, attenuation, and scattering tomography to the North Sea basins. By using seismic phases and intensities from previous passive and active surveys our aim is to image and monitor fluids under the subsurface. Seismic intensities provide unique solutions to the problem of locating/tracking gas/fluid movements in the volcanoes and depicting sub-basalt and sub-intrusives in volcanic reservoirs. The proposed techniques have been tested in volcanic Islands (Deception Island), continental calderas (Campi Flegrei) and Quaternary Volcanoes (Mount. St. Helens) and have been proved effective at monitoring fracture opening, imaging buried fluid-filled bodies, and tracking water/gas interfaces. These novel seismic attributes are modelled in space and time and connected with the lithology of the sampled medium, specifically density and permeability, with as key output a novel computational code with strong commercial potential. Data are readily available in the framework of the NERC CDT Oil & Gas project.

  8. A Battery Health Monitoring Framework for Planetary Rovers

    NASA Technical Reports Server (NTRS)

    Daigle, Matthew J.; Kulkarni, Chetan Shrikant

    2014-01-01

    Batteries have seen an increased use in electric ground and air vehicles for commercial, military, and space applications as the primary energy source. An important aspect of using batteries in such contexts is battery health monitoring. Batteries must be carefully monitored such that the battery health can be determined, and end of discharge and end of usable life events may be accurately predicted. For planetary rovers, battery health estimation and prediction is critical to mission planning and decision-making. We develop a model-based approach utilizing computaitonally efficient and accurate electrochemistry models of batteries. An unscented Kalman filter yields state estimates, which are then used to predict the future behavior of the batteries and, specifically, end of discharge. The prediction algorithm accounts for possible future power demands on the rover batteries in order to provide meaningful results and an accurate representation of prediction uncertainty. The framework is demonstrated on a set of lithium-ion batteries powering a rover at NASA.

  9. Choosing indicators of natural resource condition: A case study in Arches National Park, Utah, USA

    USGS Publications Warehouse

    Belnap, J.

    1998-01-01

    Heavy visitor use in many areas of the world have necessitated development of ways to assess visitation impacts. Arches National Park recently completed a Visitor Experience and Resource Protection (VERP) plan. Integral to this plan was developing a method to identify biological indicators that would both measure visitor impacts and response to management actions. The process used in Arches for indicator selection is outlined here as a model applicable to many areas facing similar challenges. The steps were: (1) Vegetation types most used by visitors were identified. Impacted and unimpacted areas in these types were sampled, comparing vegetation and soil factors. (2) Variables found to differ significantly between compared sites were used as potential indicators. (3) Site-specific criteria for indicators were developed, and potential indicators evaluated using these criteria. (4) Chosen indicators were further researched for ecological relevancy. (5) Final indicators were chosen, field tested, and monitoring sites designated. In Arches, indicators were chosen for monitoring annually (soil crust index, soil compaction, number of used social trails and soil aggregate stability) and every five years (vegetation cover and frequency; ground cover; soil chemistry; and plant tissue chemistry).

  10. Health and Fitness Evaluations for Long Duration Microgravity Exposure

    NASA Technical Reports Server (NTRS)

    Roden, Sean Kevin; Ewert, Patricia

    2006-01-01

    The current health maintenance program for ISS is adequate; however the future of medical care and research in space requires a change where crew time efficiency and autonomy are emphasized. NASA s medical personnel are currently refining their ability to monitor and provide remote health care in such a manner. The proposed plan would evaluate health and fitness of the on orbit crew to; perform on orbit operations, and readiness to return to a terrestrial environment. A two tiered approach will utilize exercise and medical equipment, as well as periodic medical conferences with the flight surgeon, to provide a quantitative and clinical picture of the crew s health and fitness. Any off nominal health and fitness issues that could arise will be evaluated by providing an "armamentarium" of devices both medical and exercise specific to the on orbit crew to use. The ability for the crew to provide autonomous health care, with decreasing earth support, will become increasingly more important for exploration missions. This new plan of health care and maintenance will allow us to, development such efforts while continuing to monitor and provide the best possible health, care and medical research through the microgravity environment on board ISS.

  11. Monitoring outcomes for the Medicare Advantage program: methods and application of the VR-12 for evaluation of plans.

    PubMed

    Kazis, Lewis E; Selim, Alfredo J; Rogers, William; Qian, Shirley X; Brazier, John

    2012-01-01

    The Veterans RAND 12-Item Health Survey (VR-12) is one of the major patient-reported outcomes for ranking the Medicare Advantage (MA) plans in the Health Outcomes Survey (HOS). Approaches for scoring physical and mental health are given using contemporary norms and regression estimators. A new metric approach for the VR-12 called the "VR-6D" is presented with case-mix adjustments for monitoring plans that combine utilities and mortality. Results show that the models for ranking health outcomes of the plans are robust and credible. Future directions include the use of utilities for evaluating and ranking of MA plans.

  12. Evaluation of the Monitor-CTA Automatic Vehicle Monitoring System

    DOT National Transportation Integrated Search

    1974-03-01

    In June 1972 the Urban Mass Transportation Administration requested that the Transportation System Center of DOT perform an evaluation of the CTA (Chicago Transit Authority) Monitor-Automatic Vehicle Monitor (AVM) system. TSC planned the overall eval...

  13. 75 FR 54773 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    .... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These.../Verification of Continued Attainment, Contingency Plan, and Conformity Determination Under Limited Maintenance...

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kautsky, Mark; Nguyen, Jason; Darr, Paul S.

    The Long-Term Surveillance and Maintenance Plan (LTSMP) for Amchitka details how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at and around the sites on Amchitka Island. The LTSMP calls for monitoring to be performed every 5 years, at least in the initial phase of the project. The purpose of the monitoring is to develop a baseline of activity concentrations for selected radionuclides in biota, water, and soil, both on Amchitka and at the reference location on Adak Island, approximately 322 km (200 miles) northeast of Amchitka. Datamore » compiled by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP, 2006) are being included as part of the baseline data set. The specific biological, water, and sediment samples collected during the 2011 sampling event were developed through close coordination with the primary stakeholders, including the Alaska Department of Environmental Conservation, the Aleutian Pribilof Island Association, and the U.S. Fish and Wildlife Service (USFWS). Amchitka is managed by the USFWS as part of the Alaska Maritime National Wildlife Refuge. Two plans were developed to address specific needs of the biological- and the terrestrial-monitoring programs. Results from these monitoring programs will help determine whether the environment is being impacted by radionuclide migration and uptake, and if subsistence and commercial-catch seafood is safe for human consumption. The RESRAD-BIOTA code is being used to evaluate ecological health relative to the radionuclide levels determined from this sampling event. The samples were sent to three laboratories for analysis. With the exception of the seawater samples, most of the samples were sent to the Center for Accelerator Mass Spectrometry at the Lawrence Livermore National Laboratory. A smaller subset of rock-weed samples, Star reindeer lichen samples, and soil samples collected from beneath the lichen were sent to UAF for cesium-137 analysis. Marine sediment samples were also collected and sent to UAF for testing. The seawater samples were sent to the University of Miami Tritium Laboratory for enriched tritium analysis. Results from the seawater samples for tritium were received in September 2011. Results from the 2011 sampling are expected to be available on the LM web site in 2012. (authors)« less

  15. Recommendations for data monitoring committees from the Clinical Trials Transformation Initiative.

    PubMed

    Calis, Karim A; Archdeacon, Patrick; Bain, Raymond; DeMets, David; Donohue, Miriam; Elzarrad, M Khair; Forrest, Annemarie; McEachern, John; Pencina, Michael J; Perlmutter, Jane; Lewis, Roger J

    2017-08-01

    Background/aims Use of data monitoring committees to oversee clinical trials was first proposed nearly 50 years ago. Since then, data monitoring committee use in clinical trials has increased and evolved. Nonetheless, there are no well-defined criteria for determining the need for a data monitoring committee, and considerable variability exists in data monitoring committee composition and conduct. To understand and describe the role and function of data monitoring committees, and establish best practices for data monitoring committee trial oversight, the Clinical Trials Transformation Initiative-a public-private partnership to improve clinical trials-launched a multi-stakeholder project. Methods The data monitoring committee project team included 16 individuals charged with (1) clarifying the purpose of data monitoring committees, (2) identifying best practices for independent data monitoring committee conduct, (3) describing effective communication practices, and (4) developing strategies for training data monitoring committee members. Evidence gathering included a survey, a series of focus group discussions, and a 2-day expert meeting aimed at achieving consensus opinions that form the foundation of our data monitoring committee recommendations. Results We define the role of the data monitoring committee as an advisor to the research sponsor on whether to continue, modify, or terminate a trial based on periodic assessment of trial data. Data monitoring committees should remain independent from the sponsor and be composed of members with no relevant conflicts of interest. Representation on a data monitoring committee generally should include at least one clinician with expertise in the therapeutic area being studied, a biostatistician, and a designated chairperson who has experience with clinical trials and data monitoring. Data monitoring committee meetings are held periodically to evaluate the unmasked data from ongoing trials, but the content and conduct of meetings may vary depending on specific goals or topics for deliberation. To guide data monitoring committee conduct and communication plans, a charter consistent with the protocol's research design and statistical analysis plan should be developed and agreed upon by the sponsor and the data monitoring committee prior to patient enrollment. We recommend concise and flexible charters that explain roles, responsibilities, operational issues, and how data monitoring committee recommendations are generated and communicated. The demand for data monitoring committee members appears to exceed the current pool of qualified individuals. To prepare a new generation of trained data monitoring committee members, we encourage a combination of didactic educational programs, practical experience, and skill development through apprenticeships and mentoring by experienced data monitoring committee members. Conclusion Our recommendations address data monitoring committee use, conduct, communication practices, and member preparation and training. Furthermore recommendations form the foundation for ongoing efforts to improve clinical trial oversight and enhance the safety and integrity of clinical research. These recommendations serve as a call to action for implementation of best practices that benefit study participants, study sponsors, and society.

  16. Educational Technology, E.C.I.A. Chapter 2. Final Evaluation Report.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    The Planning, Monitoring and Implementing (PMI) Evaluation Model for Decision-Making was used by the District of Columbia Public Schools to monitor their Office of Educational Technology in its efforts to provide direction and coordination for computer related activities, and to plan and implement educational television projects in math and…

  17. Management, Planning, and Monitoring Population Education Programmes. Abstract-Bibliography Series 8.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…

  18. 78 FR 54173 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Maintenance Plan Update...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... direct final rule in the Federal Register informing the public that the rule will not take effect... maintenance period, a commitment to maintain the existing monitoring network, factors and procedures to be... Network Indiana currently operates two SO 2 monitors in Lake County, Indiana. Indiana has committed to...

  19. 40 CFR 62.14454 - How must I monitor the required parameters?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false How must I monitor the required parameters? 62.14454 Section 62.14454 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital...

  20. No-migration variance petition. Appendices C--J: Volume 5, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.

  1. Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    2009-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less

  2. Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Campbell, Sam

    Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less

  3. 75 FR 9392 - New England Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... monitoring; require electronic monitoring; and address other elements of catch monitoring in the Atlantic... development of catch monitoring alternatives for inclusion in Amendment 5 to the Atlantic Herring Fishery Management Plan (FMP); alternatives may include management measures to: improve quota monitoring and...

  4. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  5. Applied Remote Sensing Program (ARSP)

    NASA Technical Reports Server (NTRS)

    Johnson, J. D.; Foster, K. E.; Mouat, D. A.; Miller, D. A.; Conn, J. S.

    1976-01-01

    The activities and accomplishments of the Applied Remote Sensing Program during FY 1975-1976 are reported. The principal objective of the Applied Remote Sensing Program continues to be designed projects having specific decision-making impacts as a principal goal. These projects are carried out in cooperation and collaboration with local, state and federal agencies whose responsibilities lie with planning, zoning and environmental monitoring and/or assessment in the application of remote sensing techniques. The end result of the projects is the use by the involved agencies of remote sensing techniques in problem solving.

  6. Childhood blindness: a new form for recording causes of visual loss in children.

    PubMed Central

    Gilbert, C.; Foster, A.; Négrel, A. D.; Thylefors, B.

    1993-01-01

    The new standardized form for recording the causes of visual loss in children is accompanied by coding instructions and by a database for statistical analysis. The aim is to record the causes of childhood visual loss, with an emphasis on preventable and treatable causes, so that appropriate control measures can be planned. With this standardized methodology, it will be possible to monitor the changing patterns of childhood blindness over a period of time in response to changes in health care services, specific interventions, and socioeconomic development. PMID:8261552

  7. Standard cost systems lead to efficiency and profitability.

    PubMed

    Bennett, J P

    1985-09-01

    Today's healthcare managers are finding that business methods such as product line planning, productivity monitoring, and advance cost measurement are necessary to operate an efficient and profitable organization. But to use these methods, managers need information about costs. Specifically, they need costs standards to determine how efficiently and profitably their institutions are operating. To develop a standard cost system, managers must be aware of the kinds of standards used, the motivational effect of standards on employee productivity, the steps necessary for effective implementation and maintenance, and the advantages and disadvantages of a standard cost system.

  8. Subsidence monitoring system for offshore applications: technology scouting and feasibility studies

    NASA Astrophysics Data System (ADS)

    Miandro, R.; Dacome, C.; Mosconi, A.; Roncari, G.

    2015-11-01

    Because of concern about possible impacts of hydrocarbon production activities on coastal-area environments and infrastructures, new hydrocarbon offshore development projects in Italy must submit a monitoring plan to Italian authorities to measure and analyse real-time subsidence evolution. The general geological context, where the main offshore Adriatic fields are located, is represented by young unconsolidated terrigenous sediments. In such geological environments, sea floor subsidence, caused by hydrocarbon extraction, is quite probable. Though many tools are available for subsidence monitoring onshore, few are available for offshore monitoring. To fill the gap ENI (Ente Nazionale Idrocarburi) started a research program, principally in collaboration with three companies, to generate a monitoring system tool to measure seafloor subsidence. The tool, according to ENI design technical-specification, would be a robust long pipeline or cable, with a variable or constant outside diameter (less than or equal to 100 mm) and interval spaced measuring points. The design specifications for the first prototype were: to detect 1 mm altitude variation, to work up to 100 m water depth and investigation length of 3 km. Advanced feasibility studies have been carried out with: Fugro Geoservices B.V. (Netherlands), D'Appolonia (Italy), Agisco (Italy). Five design (using three fundamental measurements concepts and five measurement tools) were explored: cable shape changes measured by cable strain using fiber optics (Fugro); cable inclination measured using tiltmeters (D'Appolonia) and measured using fiber optics (Fugro); and internal cable altitude-dependent pressure changes measured using fiber optics (Fugro) and measured using pressure transducers at discrete intervals along the hydraulic system (Agisco). Each design tool was analysed and a rank ordering of preferences was performed. The third method (measurement of pressure changes), with the solution proposed by Agisco, was deemed most feasible. Agisco is building the first prototype of the tool to be installed in an offshore field in the next few years. This paper describes design of instruments from the three companies to satisfy the design specification.

  9. Unmanned aerial systems for forest reclamation monitoring: throwing balloons in the air

    NASA Astrophysics Data System (ADS)

    Andrade, Rita; Vaz, Eric; Panagopoulos, Thomas; Guerrero, Carlos

    2014-05-01

    Wildfires are a recurrent phenomenon in Mediterranean landscapes, deteriorating environment and ecosystems, calling out for adequate land management. Monitoring burned areas enhances our abilities to reclaim them. Remote sensing has become an increasingly important tool for environmental assessment and land management. It is fast, non-intrusive, and provides continuous spatial coverage. This paper reviews remote sensing methods, based on space-borne, airborne or ground-based multispectral imagery, for monitoring the biophysical properties of forest areas for site specific management. The usage of satellite imagery for land use management has been frequent in the last decades, it is of great use to determine plants health and crop conditions, allowing a synergy between the complexity of environment, anthropogenic landscapes and multi-temporal understanding of spatial dynamics. Aerial photography increments on spatial resolution, nevertheless it is heavily dependent on airborne availability as well as cost. Both these methods are required for wide areas management and policy planning. Comprising an active and high resolution imagery source, that can be brought at a specific instance, reducing cost while maintaining locational flexibility is of utmost importance for local management. In this sense, unmanned aerial vehicles provide maximum flexibility with image collection, they can incorporate thermal and multispectral sensors, however payload and engine operation time limit flight time. Balloon remote sensing is becoming increasingly sought after for site specific management, catering rapid digital analysis, permitting greater control of the spatial resolution as well as of datasets collection in a given time. Different wavelength sensors may be used to map spectral variations in plant growth, monitor water and nutrient stress, assess yield and plant vitality during different stages of development. Proximity could be an asset when monitoring forest plants vitality. Early predictions of re-vegetation success facilitate precise and timely diagnosis of stress, thus remedial actions can be taken at localized detail.

  10. AgroClimate: Simulating and Monitoring the Risk of Extreme Weather Events from a Crop Phenology Perspective

    NASA Astrophysics Data System (ADS)

    Fraisse, C.; Pequeno, D.; Staub, C. G.; Perry, C.

    2016-12-01

    Climate variability, particularly the occurrence of extreme weather conditions such as dry spells and heat stress during sensitive crop developmental phases can substantially increase the prospect of reduced crop yields. Yield losses or crop failure risk due to stressful weather conditions vary mainly due to stress severity and exposure time and duration. The magnitude of stress effects is also crop specific, differing in terms of thresholds and adaptation to environmental conditions. To help producers in the Southeast USA mitigate and monitor the risk of crop losses due to extreme weather events we developed a web-based tool that evaluates the risk of extreme weather events during the season taking into account the crop development stages. Producers can enter their plans for the upcoming season in a given field (e.g. crop, variety, planting date, acreage etc.), select or not a specific El Nino Southern Oscillation (ENSO) phase, and will be presented with the probabilities (ranging from 0 -100%) of extreme weather events occurring during sensitive phases of the growing season for the selected conditions. The DSSAT models CERES-Maize, CROPGRO-Soybean, CROPGRO-Cotton, and N-Wheat phenology models have been translated from FORTRAN to a standalone versions in R language. These models have been tested in collaboration with Extension faculty and producers during the 2016 season and their usefulness for risk mitigation and monitoring evaluated. A companion AgroClimate app was also developed to help producers track and monitor phenology development during the cropping season.

  11. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  12. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peelle, E.; Schweitzer, M.; Scharre, P.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less

  13. 30 CFR 250.221 - What environmental monitoring information must accompany the EP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What environmental monitoring information must... monitoring information must accompany the EP? The following environmental monitoring information, as applicable, must accompany your EP: (a) Monitoring systems. A description of any existing and planned...

  14. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  15. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  16. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  17. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  18. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  19. Preparing routine health information systems for immediate health responses to disasters

    PubMed Central

    Aung, Eindra; Whittaker, Maxine

    2013-01-01

    During disaster times, we need specific information to rapidly plan a disaster response, especially in sudden-onset disasters. Due to the inadequate capacity of Routine Health Information Systems (RHIS), many developing countries face a lack of quality pre-disaster health-related data and efficient post-disaster data processes in the immediate aftermath of a disaster. Considering the significance of local capacity during the early stages of disaster response, RHIS at local, provincial/state and national levels need to be strengthened so that they provide relief personnel up-to-date information to plan, organize and monitor immediate relief activities. RHIS professionals should be aware of specific information needs in disaster response (according to the Sphere Project’s Humanitarian Minimum Standards) and requirements in data processes to fulfil those information needs. Preparing RHIS for disasters can be guided by key RHIS-strengthening frameworks; and disaster preparedness must be incorporated into countries’ RHIS. Mechanisms must be established in non-disaster times and maintained between RHIS and information systems of non-health sectors for exchanging disaster-related information and sharing technologies and cost. PMID:23002249

  20. Design of Cycle 3 of the National Water-Quality Assessment Program, 2013-23: Part 2: Science plan for improved water-quality information and management

    USGS Publications Warehouse

    Rowe, Gary L.; Belitz, Kenneth; Demas, Charlie R.; Essaid, Hedeff I.; Gilliom, Robert J.; Hamilton, Pixie A.; Hoos, Anne B.; Lee, Casey J.; Munn, Mark D.; Wolock, David W.

    2013-01-01

    This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate. However, a combination of funding growth and extensive collaboration with other USGS programs and other Federal, State, and local agencies, public interest groups, professional and trade associations, academia, and private industry will be needed to fully realize the monitoring and modeling goals laid out in this plan (USGS Fact Sheet 2013-3008).

  1. Writer's cramp: increased dorsal premotor activity during intended writing.

    PubMed

    Delnooz, Cathérine C S; Helmich, Rick C; Medendorp, W P; Van de Warrenburg, Bart P C; Toni, Ivan

    2013-03-01

    Simple writer's cramp (WC) is a task-specific form of dystonia, characterized by abnormal movements and postures of the hand during writing. It is extremely task-specific, since dystonic symptoms can occur when a patient uses a pencil for writing, but not when it is used for sharpening. Maladaptive plasticity, loss of inhibition, and abnormal sensory processing are important pathophysiological elements of WC. However, it remains unclear how those elements can account for its task-specificity. We used fMRI to isolate cerebral alterations associated with the task-specificity of simple WC. Subjects (13 simple WC patients, 20 matched controls) imagined grasping a pencil to either write with it or sharpen it. On each trial, we manipulated the pencil's position and the number of imagined movements, while monitoring variations in motor output with electromyography. We show that simple WC is characterized by abnormally increased activity in the dorsal premotor cortex (PMd) when imagined actions are specifically related to writing. This cerebral effect was independent from the known deficits in dystonia in generating focal motor output and in processing somatosensory feedback. This abnormal activity of the PMd suggests that the task-specific element of simple WC is primarily due to alterations at the planning level, in the computations that transform a desired action outcome into the motor commands leading to that action. These findings open the way for testing the therapeutic value of interventions that take into account the computational substrate of task-specificity in simple WC, e.g. modulations of PMd activity during the planning phase of writing. Copyright © 2011 Wiley Periodicals, Inc.

  2. 46 CFR 160.013-1 - Applicable specification and plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Applicable specification and plan. 160.013-1 Section 160... Vessels § 160.013-1 Applicable specification and plan. (a) Specification. The following specification, of... Specification: GGG-A-926—Axes. (b) Plan. The following plan, of the issue in effect on the date hatchets are...

  3. 46 CFR 160.013-1 - Applicable specification and plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Applicable specification and plan. 160.013-1 Section 160... Vessels § 160.013-1 Applicable specification and plan. (a) Specification. The following specification, of... Specification: GGG-A-926—Axes. (b) Plan. The following plan, of the issue in effect on the date hatchets are...

  4. User manual and spreadsheet tool for implementing performance planning for rural planning organizations.

    DOT National Transportation Integrated Search

    2017-03-01

    The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...

  5. Global Atmospheric Monitoring

    ERIC Educational Resources Information Center

    Wallen, Carl C.

    1975-01-01

    The global atmospheric monitoring plans of the World Meteorological Organization are detailed. Single and multipurpose basic monitoring systems and the monitoring of chemical properties are discussed. The relationship of the World Meteorological Organization with the United Nations environment program is discussed. A map of the World…

  6. 77 FR 66947 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... NMFS, copies of addenda to FY 2012 sector operations plans detailing industry-funded monitoring plans... from Federal fishing regulations through its annual operations plan (for more information on sector operations plans and regulatory exemptions, see the fishing year 2012 sector operations plan proposed rule...

  7. The provision of workplace accommodations following cancer: survivor, provider, and employer perspectives.

    PubMed

    Stergiou-Kita, Mary; Pritlove, Cheryl; van Eerd, Dwayne; Holness, Linn D; Kirsh, Bonnie; Duncan, Andrea; Jones, Jennifer

    2016-06-01

    With improvements in screening, diagnosis, and treatment, the number of persons surviving cancer and staying at or returning to work is increasing. While workplace accommodations optimize workers' abilities to participate in the workforce, there has been little in-depth investigation of the types of accommodations reported to have been provided to cancer survivors and the processes relevant to ensuring their successful implementation. We employed an exploratory qualitative method and conducted 40 semi-structured interviews with three groups: (i) cancers survivors (n = 16), (ii) health/vocational service providers (n = 16), and (iii) employer representatives (n = 8) to explore return to work and accommodation processes, successes, and challenges. An inductive thematic analysis approach was used to analyze the data. Four types of accommodations were recommended: (1) graduated return to work plans and flexible scheduling, (2) modification of work duties and performance expectations, (3) retraining and supports at the workplace, and (4) modification of the physical work environment and/or the provision of adaptive aids/technologies. Processes relevant to ensuring effective accommodations included: (1) developing knowledge about accommodations, (2) employer's ability to accommodate, (3) negotiating reasonable accommodations, (4) customizing accommodations, and (5) implementing and monitoring accommodation plans. Accommodation challenges included: (1) survivors' fears requesting accommodations, (2) developing clear and specific accommodations, (3) difficult to accommodate jobs, and (4) workplace challenges, including strained pre-cancer workplace relationships, insufficient/inflexible workplace policies, employer concerns regarding productivity and precedent setting, and limited modified duties. Accommodations need to be customized and clearly linked to survivors' specific job demands, work context, and available workplace supports. Survivors need to feel comfortable disclosing the need for accommodations. Ongoing communication and monitoring are required to ensure accommodations are implemented and changes made to the return to work plan as required. The provision of appropriate workplace accommodations can enhance survivors' abilities to stay or return to work.

  8. Strategies for monitoring terrestrial animals and habitats

    Treesearch

    Richard Holthausen; Raymond L. Czaplewski; Don DeLorenzo; Greg Hayward; Winifred B. Kessler; Pat Manley; Kevin S. McKelvey; Douglas S. Powell; Leonard F. Ruggiero; Michael K. Schwartz; Bea Van Horne; Christina D. Vojta

    2005-01-01

    This General Technical Report (GTR) addresses monitoring strategies for terrestrial animals and habitats. It focuses on monitoring associated with National Forest Management Act planning and is intended to apply primarily to monitoring efforts that are broader than individual National Forests. Primary topics covered in the GTR are monitoring requirements; ongoing...

  9. Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2005-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less

  10. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  11. Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2006-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  12. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  13. 40 CFR 63.505 - Parameter monitoring levels and excursions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... less than 4 hours in an operating day and more than two of the hours during the period of operation do... filling period for the storage vessel, is above the maximum level or below the minimum level established... plan, during the filling period for the storage vessel. (ii) If the monitoring plan does not specify...

  14. 76 FR 39103 - Science Advisory Board Staff Office Notification of a Public Teleconference of the Air Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... draft plans for Photochemical Assessment Monitoring Stations (PAMS) Network Re-engineering. DATES: A... information concerning the EPA CASAC can be found at the EPA CASAC Web site at http://www.epa.gov/casac . Any inquiry regarding EPA's draft plans for PAMS Network Re-engineering should be directed to Mr. Kevin...

  15. Monitoring the Effective and Efficient Use of Land: The English Approach

    NASA Astrophysics Data System (ADS)

    Ganser, Robin

    In England quantified targets for the reuse of brownfields and of existing buildings place particular requirements on the planning system as part of the overall strategy to make effective use of natural resources. Achieving these targets is not free of obstacles and potential conflicts. Therefore monitoring of policy implementation is a necessity in the planning system.

  16. Learning about the Effects of Development Education Programmes: Strengthening Planning, Monitoring, and Evaluation (PME) through Reflective Practice

    ERIC Educational Resources Information Center

    Van Ongevalle, Jan; Huyse, Huib; Van Petegem, Peter

    2013-01-01

    This article reports on the results of an action research project (2010-13) in which ten Belgian organizations who implement development education programmes explored different planning, monitoring, and evaluation (PME) approaches with the aim of learning more effectively about their results. PME approaches piloted included outcome mapping, most…

  17. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

  18. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

  19. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

  20. 9 CFR 56.10 - Initial State response and containment plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .../H7 LOW PATHOGENIC AVIAN INFLUENZA § 56.10 Initial State response and containment plan. (a) In order... and education programs regarding avian influenza. (b) If a State is designated a U.S. Avian Influenza Monitored State, Layers under § 146.24(a) of this chapter or a U.S. Avian Influenza Monitored State, Turkeys...

Top