Sample records for stabilization management plan

  1. Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts

    USGS Publications Warehouse

    Parker, Gene W.; Pinson, Harlow

    1993-01-01

    A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.

  2. A methodology for decisionmaking in project evaluation in land management planning

    Treesearch

    A. Weintraub

    1978-01-01

    In order to evaluate alternative plans, wildland management planners must consider many objectives, such as timber production, recreational use, and community stability. The method presented utilizes the type of qualitative and intuitive information widely available to wildland management planners, and structures this information into a format suitable for...

  3. An Analysis of Secondary Schools' Crisis Management Preparedness: National Implications

    ERIC Educational Resources Information Center

    Adams, Cheantel M.; Kritsonis, William Allan

    2006-01-01

    The purpose of this study is to analyze crisis management plans of schools that have experienced crisis situations in the past. The plans used by these schools to manage these crisis situations will be evaluated for their effectiveness or ineffectiveness in re-establishing stability to their organization. With such information, other schools may…

  4. Who Should Have the Hammer? Leadership of SSTR Planning and Operations

    DTIC Science & Technology

    2009-10-23

    Security Presidential Directive/NSPD-44 was produced which clarified governmental management of reconstruction and stabilization efforts. 1 Additionally...President, “ Management of Interagency Efforts Concerning Reconstruction and Stabilization, pp. 1 2 U.S. Department of Defense, DoDD 3000.05, pp.1 3 U.S...from regional and local State personnel, and conditional stand up of teams within the Interagency Management System. 16 Defense Department guidance

  5. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  6. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  7. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  8. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...

  9. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  10. AEERL (AIR AND ENERGY ENGINEERING RESEARCH LABORATORY) RESEARCH PLAN ON THE GLOBAL CLIMATE EMISSIONS ASSESSMENT AND STABILIZATION PROGRAM

    EPA Science Inventory

    The paper discusses the Environmental Protection Agency's (EPA) Air and Energy Engineering Research Laboratory (AEERL) research plan for work in the global climate area. The plan, written for discussion with senior scientists and program managers at EPA's Global Climate Change Re...

  11. Market characteristics and awareness of managed care options among elderly beneficiaries enrolled in traditional Medicare.

    PubMed

    Mittler, Jessica N; Landon, Bruce E; Zaslavsky, Alan M; Cleary, Paul D

    2011-10-14

    Medicare beneficiaries' awareness of Medicare managed care plans is critical for realizing the potential benefits of coverage choices. To assess the relationships of the number of Medicare risk plans, managed care penetration, and stability of plans in an area with traditional Medicare beneficiaries' awareness of the program. Cross-sectional analysis of Medicare Current Beneficiary Survey data about beneficiaries' awareness and knowledge of Medicare managed care plan availability. Logistic regression models used to assess the relationships between awareness and market characteristics. Traditional Medicare beneficiaries (n = 3,597) who had never been enrolled in Medicare managed care, but had at least one plan available in their area in 2002, and excluding beneficiaries under 65, receiving Medicaid, or with end stage renal disease. Traditional Medicare beneficiaries' knowledge of Medicare managed care plans in general and in their area. Having more Medicare risk plans available was significantly associated with greater awareness, and having an intermediate number of plans (2-4) was significantly associated with more accurate knowledge of Medicare risk plan availability than was having fewer or more plans. Medicare may have more success engaging consumers in choice and capturing the benefits of plan competition by more actively selecting and managing the plan choice set. Public Domain.

  12. Market Characteristics and Awareness of Managed Care Options Among Elderly Beneficiaries Enrolled in Traditional Medicare

    PubMed Central

    Mittler, Jessica N.; Landon, Bruce E.; Zaslavsky, Alan M.; Cleary, Paul D.

    2011-01-01

    Background Medicare beneficiaries' awareness of Medicare managed care plans is critical for realizing the potential benefits of coverage choices. Objectives To assess the relationships of the number of Medicare risk plans, managed care penetration, and stability of plans in an area with traditional Medicare beneficiaries' awareness of the program. Research Design Cross-sectional analysis of Medicare Current Beneficiary Survey data about beneficiaries' awareness and knowledge of Medicare managed care plan availability. Logistic regression models used to assess the relationships between awareness and market characteristics. Subjects Traditional Medicare beneficiaries (n = 3,597) who had never been enrolled in Medicare managed care, but had at least one plan available in their area in 2002, and excluding beneficiaries under 65, receiving Medicaid, or with end stage renal disease. Measures Traditional Medicare beneficiaries' knowledge of Medicare managed care plans in general and in their area. Results Having more Medicare risk plans available was significantly associated with greater awareness, and having an intermediate number of plans (2-4) was significantly associated with more accurate knowledge of Medicare risk plan availability than was having fewer or more plans. Conclusions Medicare may have more success engaging consumers in choice and capturing the benefits of plan competition by more actively selecting and managing the plan choice set. PMID:22340776

  13. 75 FR 82296 - Fisheries Off West Coast States; Pacific Coast Groundfish Fishery Management Plan; Amendments 20...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... round fishing opportunities to provide community stability. This is contradictory to one of the goals of... community stability. It is also in the public interest to revise the calculation method for Pacific halibut... Groundfish FMP to allow for year round fishing opportunities to provide community stability. It is also in...

  14. Consumer-directed health plans: what happened?

    PubMed

    Goldsmith, Jeff

    2007-08-01

    CDHPs can stabilize growth in health costs, but the health plan-subscriber relationship should be more transparent. CFOs should ensure that increased cost exposure in CDHPs is paired with broad, deep disease management and employee assistance support. Hospitals should plan for the likelihood that, one way or another, consumers will be paying more of their healthcare bill.

  15. Results of the Workshop on Two-Phase Flow, Fluid Stability and Dynamics: Issues in Power, Propulsion, and Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    McQuillen, John; Rame, Enrique; Kassemi, Mohammad; Singh, Bhim; Motil, Brian

    2003-01-01

    The Two-phase Flow, Fluid Stability and Dynamics Workshop was held on May 15, 2003 in Cleveland, Ohio to define a coherent scientific research plan and roadmap that addresses the multiphase fluid problems associated with NASA s technology development program. The workshop participants, from academia, industry and government, prioritized various multiphase issues and generated a research plan and roadmap to resolve them. This report presents a prioritization of the various multiphase flow and fluid stability phenomena related primarily to power, propulsion, fluid and thermal management and advanced life support; and a plan to address these issues in a logical and timely fashion using analysis, ground-based and space-flight experiments.

  16. 25 CFR 1001.2 - Applicant eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... governing body. (c) Demonstrate financial stability and financial management capability by furnishing... participating in the consortium do not have to meet this requirement. (d) Successfully complete the planning phase for self-governance. A final planning report must be submitted which demonstrates that the tribe...

  17. 76 FR 42590 - Retrospective Review Under E.O. 13563; Improving Common Acreage Reporting Processes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... solutions to preserve and strengthen the economic stability of America's agricultural producers. RMA..., commodity, credit, conservation, disaster, and emergency assistance programs that help improve the stability... management system. To implement ACRSI in an economical manner, we plan to the extent possible to utilize CIMS...

  18. 75 FR 26702 - Fisheries off West Coast States; Pacific Coast Groundfish Fishery Management Plan; Amendments 20...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... increase net economic benefits, create individual economic stability, provide full utilization of the trawl... (Amendments 20 and 21) is intended to increase net economic benefits, create individual economic stability... licenses, quota share accounts, vessel accounts, further tracking and monitoring components, and economic...

  19. 25 CFR 1000.17 - What documents must a Tribe/Consortium submit to OSG to apply for admission to the applicant pool?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... following: (a) Successful completion of a planning phase and a planning report. The requirements for both of these are described in § 1000.19 and § 1000.20. A Consortium's planning activities satisfy this... financial stability and financial management capability for the previous 3 fiscal years. This will be done...

  20. 77 FR 16848 - Announcement of Funding Awards for the Neighborhood Stabilization Program (NSP) Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... Development. Appendix A Recipient State Amount APD Urban Planning Management, FL $500,000 LLC. Capital Access... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5499-FA-01] Announcement of Funding...) 2011 AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION...

  1. Progress Toward Security and Stability in Afghanistan. Report to Congress in accordance with the 2008 National Defense Authorization Act (Section 1230, Public Law 110-181)

    DTIC Science & Technology

    2009-01-01

    management. Forest and Natural Resources Management: USDA has provided technical guidance to assist MAIL in developing a pistachio forest management...plan for rehabilitating degraded pistachio woodlands. In 2006, target villages realized a 65 percent increase in income from pistachio nuts, with

  2. Agricultural conservation planning framework: 2. Classification of riparian buffer design-types with application to assess and map stream corridors

    USDA-ARS?s Scientific Manuscript database

    A watershed’s riparian corridor presents opportunities to stabilize streambanks, intercept runoff, and influence shallow groundwater with riparian buffers. This paper presents a system to classify these riparian opportunities and apply it towards riparian management planning in HUC12 watersheds. Hig...

  3. Under the radar: advances in murrelet monitoring.

    Treesearch

    Sally Duncan

    2001-01-01

    Future choices in managing federal and private forest lands in the Pacific Northwest, particularly for commodity production, are partly dependent on how the threatened marbled murrelet responds to the Northwest Forest Plan. Is the plan functioning for this elusive species, and are populations stabilized or increasing?Because the murrelet forages at sea but...

  4. Humid site stabilization and closure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cutshall, N.H.

    1981-01-01

    The purpose of the work described here is to identify and evaluate the importance of factors that are expected to dictate the nature of site stabilization and closure requirements. Subsequent efforts will plan for implementation of such requirements. Two principal areas of site stabilization and closure effort will be pursued initially - geological management and vegetation management. The geological effort will focus on chemical weathering and surficial erosion. Such catastrophic geologic events as landslides, flooding, earthquakes, volcanos, etc. are already considered in site selection and operation and these factors will not be emphasized initially. Vegetation management will be designed tomore » control erosion, to minimize nuclide mobilization by roots and to be compatible with natural successional pressures. It is anticipated that the results of this work will be important both to site selection and operation as well as the actual stabilization and closure procedure.« less

  5. 40 CFR 68.165 - Offsite consequence analysis.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.165 Offsite consequence... released in pounds; (7) Release rate; (8) Release duration; (9) Wind speed and atmospheric stability class...

  6. 40 CFR 68.165 - Offsite consequence analysis.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.165 Offsite consequence... released in pounds; (7) Release rate; (8) Release duration; (9) Wind speed and atmospheric stability class...

  7. 40 CFR 68.165 - Offsite consequence analysis.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.165 Offsite consequence... released in pounds; (7) Release rate; (8) Release duration; (9) Wind speed and atmospheric stability class...

  8. Rehabilitation of alpine vegetation in the Adirondack Mountains of New York State

    Treesearch

    E.H. Ketchledge; R.E. Leonard; N.A. Richards; P.F. Craul; A.R. Eschner; A.R. Eschner

    1985-01-01

    This paper describes field experiments in using sod-forming grasses from lower elevations as soil stabilizers, and discusses the effects of fertilizing and transplanting native vegetation as part of an integrated management plan for rehabilitating alpine plant communities in the Adirondacks. Results show that it is possible to stabilize severely degraded alpine...

  9. International Agreements and Cooperation in Environmental Conservation and Resource Management.

    ERIC Educational Resources Information Center

    Thacher, Peter S.

    1991-01-01

    Considerations regarding stabilizing the greenhouse effect (global warming) emphasize the difficulties in launching a comprehensive plan to deal with aspects of global change. Experience gained in dealing with atmospheric issues will help in developing a process that links management and research in solving global problems. (SLD)

  10. Managerial Innovation: Rules for Successful Implementation.

    ERIC Educational Resources Information Center

    Baldridge, J. Victor

    1980-01-01

    The Higher Education Research Institute studied the impact of Exxon Foundation grants from the Resource Allocation and Management Program (RAMP) at 49 private colleges to determine if and how college planning and financial stability were affected by changes in management techniques. Rules for supporting innovations at various phases of a project's…

  11. Proceedings of a workshop on slope stability: problems and solutions in forest management; Seattle, Washington; February 6-8, 1984.

    Treesearch

    Doug Swanston

    1985-01-01

    mountainous areas of the western United States, Canada, and Alaska is severely restricted by unstable terrain that is susceptible to soil movement varying from surface creep to catastrophic landslides. Management practices that might trigger or increase such disturbance are increasingly subject to public scrutiny.Land management-planning as required by the...

  12. Succession Planning in the Iranian Health System: A Case Study of the Ministry of Health and Medical Education

    PubMed Central

    Mehrtak, Mohamad; Vatankhah, Soodabeh; Delgoshaei, Bahram; Gholipour, Arian

    2014-01-01

    Background: Succession planning promotes the culture of private ownership, staff loyalty to the organization and develops organizational commitment, and increases organizational stability. The study was conducted to examine the status of succession planning in the Iranian health system in order to highlight the key concepts, provide new insight, and attract the attention of senior managers of the Ministry of Health and Medical Education to the importance of succession planning in achieving organizational goals. Methods: In a qualitative study with a framework analysis approach, semi-structured interviews were conducted with a sample selected using purposive and snowball sampling procedure. The MAXQDA-10 was used to apply the codes and manage the data. The codes were extracted using inductive and deductive methods. Results: Fourteen themes and six main subthemes were identified, including planning, organizational culture, system approach, competency model, career path, and senior managers. Our findings indicate a lack of succession planning in the Iranian health system. Conclusion: lack of succession planning could lead to inefficiency and ineffectiveness in health services provision. Implementation of succession planning could maximize human resources utilization. PMID:25168998

  13. Succession planning in the Iranian health system: a case study of the Ministry of Health and Medical Education.

    PubMed

    Mehrtak, Mohamad; Vatankhah, Soodabeh; Delgoshaei, Bahram; Gholipour, Arian

    2014-05-30

    Succession planning promotes the culture of private ownership, staff loyalty to the organization and develops organizational commitment, and increases organizational stability. The study was conducted to examine the status of succession planning in the Iranian health system in order to highlight the key concepts, provide new insight, and attract the attention of senior managers of the Ministry of Health and Medical Education to the importance of succession planning in achieving organizational goals. In a qualitative study with a framework analysis approach, semi-structured interviews were conducted with a sample selected using purposive and snowball sampling procedure. The MAXQDA-10 was used to apply the codes and manage the data. The codes were extracted using inductive and deductive methods. Fourteen themes and six main subthemes were identified, including planning, organizational culture, system approach, competency model, career path, and senior managers. Our findings indicate a lack of succession planning in the Iranian health system. lack of succession planning could lead to inefficiency and ineffectiveness in health services provision. Implementation of succession planning could maximize human resources utilization.

  14. Fixed precision sampling plans for white apple leafhopper (Homoptera: Cicadellidae) on apple.

    PubMed

    Beers, Elizabeth H; Jones, Vincent P

    2004-10-01

    Constant precision sampling plans for the white apple leafhopper, Typhlocyba pomaria McAtee, were developed so that it could be used as an indicator species for system stability as new integrated pest management programs without broad-spectrum pesticides are developed. Taylor's power law was used to model the relationship between the mean and the variance, and Green's constant precision sequential sample equation was used to develop sampling plans. Bootstrap simulations of the sampling plans showed greater precision (D = 0.25) than the desired precision (Do = 0.3), particularly at low mean population densities. We found that by adjusting the Do value in Green's equation to 0.4, we were able to reduce the average sample number by 25% and provided an average D = 0.31. The sampling plan described allows T. pomaria to be used as reasonable indicator species of agroecosystem stability in Washington apple orchards.

  15. Savannah River Site nuclear materials management plan FY 2017-2031

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, V.

    The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less

  16. Does the Spine Surgeon’s Experience Affect Fracture Classification, Assessment of Stability, and Treatment Plan in Thoracolumbar Injuries?

    PubMed Central

    Kanna, Rishi Mugesh; Schroeder, Gregory D.; Oner, Frank Cumhur; Vialle, Luiz; Chapman, Jens; Dvorak, Marcel; Fehlings, Michael; Shetty, Ajoy Prasad; Schnake, Klaus; Kandziora, Frank; Vaccaro, Alexander R.

    2017-01-01

    Study Design: Prospective survey-based study. Objectives: The AO Spine thoracolumbar injury classification has been shown to have good reproducibility among clinicians. However, the influence of spine surgeons’ clinical experience on fracture classification, stability assessment, and decision on management based on this classification has not been studied. Furthermore, the usefulness of varying imaging modalities including radiographs, computed tomography (CT) and magnetic resonance imaging (MRI) in the decision process was also studied. Methods: Forty-one spine surgeons from different regions, acquainted with the AOSpine classification system, were provided with 30 thoracolumbar fractures in a 3-step assessment: first radiographs, followed by CT and MRI. Surgeons classified the fracture, evaluated stability, chose management, and identified reasons for any changes. The surgeons were divided into 2 groups based on years of clinical experience as <10 years (n = 12) and >10 years (n = 29). Results: There were no significant differences between the 2 groups in correctly classifying A1, B2, and C type fractures. Surgeons with less experience had more correct diagnosis in classifying A3 (47.2% vs 38.5% in step 1, 73.6% vs 60.3% in step 2 and 77.8% vs 65.5% in step 3), A4 (16.7% vs 24.1% in step 1, 72.9% vs 57.8% in step 2 and 70.8% vs 56.0% in step3) and B1 injuries (31.9% vs 20.7% in step 1, 41.7% vs 36.8% in step 2 and 38.9% vs 33.9% in step 3). In the assessment of fracture stability and decision on treatment, the less and more experienced surgeons performed equally. The selection of a particular treatment plan varied in all subtypes except in A1 and C type injuries. Conclusion: Surgeons’ experience did not significantly affect overall fracture classification, evaluating stability and planning the treatment. Surgeons with less experience had a higher percentage of correct classification in A3 and A4 injuries. Despite variations between them in classification, the assessment of overall stability and management decisions were similar between the 2 groups. PMID:28815158

  17. Does the Spine Surgeon's Experience Affect Fracture Classification, Assessment of Stability, and Treatment Plan in Thoracolumbar Injuries?

    PubMed

    Rajasekaran, Shanmuganathan; Kanna, Rishi Mugesh; Schroeder, Gregory D; Oner, Frank Cumhur; Vialle, Luiz; Chapman, Jens; Dvorak, Marcel; Fehlings, Michael; Shetty, Ajoy Prasad; Schnake, Klaus; Kandziora, Frank; Vaccaro, Alexander R

    2017-06-01

    Prospective survey-based study. The AO Spine thoracolumbar injury classification has been shown to have good reproducibility among clinicians. However, the influence of spine surgeons' clinical experience on fracture classification, stability assessment, and decision on management based on this classification has not been studied. Furthermore, the usefulness of varying imaging modalities including radiographs, computed tomography (CT) and magnetic resonance imaging (MRI) in the decision process was also studied. Forty-one spine surgeons from different regions, acquainted with the AOSpine classification system, were provided with 30 thoracolumbar fractures in a 3-step assessment: first radiographs, followed by CT and MRI. Surgeons classified the fracture, evaluated stability, chose management, and identified reasons for any changes. The surgeons were divided into 2 groups based on years of clinical experience as <10 years (n = 12) and >10 years (n = 29). There were no significant differences between the 2 groups in correctly classifying A1, B2, and C type fractures. Surgeons with less experience had more correct diagnosis in classifying A3 (47.2% vs 38.5% in step 1, 73.6% vs 60.3% in step 2 and 77.8% vs 65.5% in step 3), A4 (16.7% vs 24.1% in step 1, 72.9% vs 57.8% in step 2 and 70.8% vs 56.0% in step3) and B1 injuries (31.9% vs 20.7% in step 1, 41.7% vs 36.8% in step 2 and 38.9% vs 33.9% in step 3). In the assessment of fracture stability and decision on treatment, the less and more experienced surgeons performed equally. The selection of a particular treatment plan varied in all subtypes except in A1 and C type injuries. Surgeons' experience did not significantly affect overall fracture classification, evaluating stability and planning the treatment. Surgeons with less experience had a higher percentage of correct classification in A3 and A4 injuries. Despite variations between them in classification, the assessment of overall stability and management decisions were similar between the 2 groups.

  18. Rocky to bullwinkle: understanding flying squirrels helps us restore dry forest ecosystems.

    Treesearch

    Jonathan Thompson

    2006-01-01

    A century of effective fire suppression has radically transformed many forested landscapes on the east side of the Cascades. Managers of dry forests critically need information to help plan for and implement forest restoration . Management priorities include the stabilization of fire regimes and the maintenance of habitat for the northern spotted owl and other old-...

  19. 75 FR 67032 - Fisheries Off West Coast States; Pacific Coast Groundfish Fishery Management Plan; Amendments 20...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ... flounder, other flatfish, and slope rockfish. Increases are necessary to relieve a restriction by allowing... round fishing opportunities to provide community stability. These corrections are needed to keep the...

  20. A Climate Change Adaptation Strategy for Management of ...

    EPA Pesticide Factsheets

    Sea level rise is causing shoreline erosion, increased coastal flooding, and marsh vulnerability to the impact of storms. Coastal marshes provide flood abatement, carbon and nutrient sequestration, water quality maintenance, and habitat for fish, shellfish, and wildlife, including species of concern, such as the saltmarsh sparrow (Ammodramus caudacutus). We present a climate change adaptation strategy (CCAS) adopted by scientific, management, and policy stakeholders for managing coastal marshes and enhancing system resiliency. A common adaptive management approach previously used for restoration projects was modified to identify climate-related vulnerabilities and plan climate change adaptive actions. As an example of implementation of the CCAS, we describe the stakeholder plans and management actions the US Fish and Wildlife Service and partners developed to build coastal resiliency in the Narrow River Estuary, RI, in the aftermath of Superstorm Sandy. When possible, an experimental BACI (before-after, control-impact) design, described as pre- and post-sampling at the impact site and one or more control sites, was incorporated into the climate change adaptation and implementation plans. Specific climate change adaptive actions and monitoring plans are described and include shoreline stabilization, restoring marsh drainage, increasing marsh elevation, and enabling upland marsh migration. The CCAS provides a framework and methodology for successfully managing coa

  1. JPRS Report, China, Red Flag, Number 12, 16 June 1988

    DTIC Science & Technology

    1988-08-12

    national econ- omy; correctly handling the relations between stability and growth speed and results, quantity and quality, construction and... growth of overall demand and striving to increase sup- plies. Meanwhile, an effort should be directed toward developing the market and improving...Planned and Macroeconomic Management. The Most Important Thing Is t© Emancipate the Mind Further, Change the Traditional Concept of Planning, and

  2. Integrated Data & Analysis in Support of Informed and Transparent Decision Making

    NASA Astrophysics Data System (ADS)

    Guivetchi, K.

    2012-12-01

    The California Water Plan includes a framework for improving water reliability, environmental stewardship, and economic stability through two initiatives - integrated regional water management to make better use of local water sources by integrating multiple aspects of managing water and related resources; and maintaining and improving statewide water management systems. The Water Plan promotes ways to develop a common approach for data standards and for understanding, evaluating, and improving regional and statewide water management systems, and for common ways to evaluate and select from alternative management strategies and projects. The California Water Plan acknowledges that planning for the future is uncertain and that change will continue to occur. It is not possible to know for certain how population growth, land use decisions, water demand patterns, environmental conditions, the climate, and many other factors that affect water use and supply may change by 2050. To anticipate change, our approach to water management and planning for the future needs to consider and quantify uncertainty, risk, and sustainability. There is a critical need for information sharing and information management to support over-arching and long-term water policy decisions that cross-cut multiple programs across many organizations and provide a common and transparent understanding of water problems and solutions. Achieving integrated water management with multiple benefits requires a transparent description of dynamic linkages between water supply, flood management, water quality, land use, environmental water, and many other factors. Water Plan Update 2013 will include an analytical roadmap for improving data, analytical tools, and decision-support to advance integrated water management at statewide and regional scales. It will include recommendations for linking collaborative processes with technical enhancements, providing effective analytical tools, and improving and sharing data and information. Specifically, this includes achieving better integration and consistency with other planning activities; obtaining consensus on quantitative deliverables; building a common conceptual understanding of the water management system; developing common schematics of the water management system; establishing modeling protocols and standards; and improving transparency and exchange of Water Plan information.

  3. Action plans for COPD: strategies to manage exacerbations and improve outcomes.

    PubMed

    Jalota, Leena; Jain, Vipul V

    2016-01-01

    COPD is the third-largest killer in the world, and certainly takes a toll on the health care system. Recurrent COPD exacerbations accelerate lung-function decline, worsen mortality, and consume over US$50 billion in health care spending annually. This has led to a tide of payment reforms eliciting interest in strategies reducing preventable COPD exacerbations. In this review, we analyze and discuss the evidence for COPD action plan-based self-management strategies. Although action plans may provide stabilization of acute symptomatology, there are several limitations. These include patient-centered attributes, such as comprehension and adherence, and nonadherence of health care providers to established guidelines. While no single intervention can be expected independently to translate into improved outcomes, structured together within a comprehensive integrated disease-management program, they may provide a robust paradigm.

  4. Progress Toward Security and Stability in Afghanistan

    DTIC Science & Technology

    2008-06-01

    developing a pistachio forest management plan for rehabilitating degraded pistachio woodlands. In 2006, target villages realized a 65 percent...increase in income from pistachio nuts, with 2007 also showing an increase above 2006. This project is being expanded to include other villages. USDA

  5. Deterrence with China: Avoiding Nuclear Miscalculation

    DTIC Science & Technology

    2014-01-01

    When each nation can manage these three elements in the correct way, the cost -benefit calculations of each side should favor deterrence of a...under pressure to justify the cost of its plans to replace its SSBN fleet. After a recent 2-year delay in the planned SSBN replacement program, any...of CPGS may prove advantageous in some scenarios,31 but those advantages do not come with- out a cost to nuclear deterrence stability with China—a

  6. Australian Pine, Casuarina equisetifolia L. Management Plan for Florida

    USDA-ARS?s Scientific Manuscript database

    Australian pine (Casuarina equisetifolia) is a fast growing tree native to Australia, Southeast Asia, India, Bangladesh and the Pacific Islands that has been introduced to tropical areas throughout the world as an ornamental; to stabilize sand dunes; to form windbreaks around canals, roads, houses, ...

  7. Texas lignite mining: Groundwater and slope stability control in the nineties and beyond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence J.

    As lignite mining in Texas approaches and exceeds depths of 200 feet below ground level, rising costs demand that innovative mining approaches be used in order to maintain the economic viability of lignite mining. Groundwater and slope stability problems multiply at these depths, resulting in increasing focus on how to control these costs. Dewatering costs are consistently rising for the lignite industry, as deeper mining encounters more and larger saturated sand bodies. These sands require dewatering in order to improve slope stability. Planning and analysis become more important as the number of wells grows beyond what can be managed withmore » a simple {open_quotes}cookie-cutter{close_quotes} approach. Slope stability plays an increasing role in mining concerns as deeper lignite is recovered. Slope stability causes several problems, including loss of lignite, increased rehandle, and hazards to personnel and equipment. Traditional lignite mine planning involved a fairly {open_quotes}generic{close_quotes} pit design with one design highwall angle, one design spoil angle, and little geotechnical evaluation of the deposit. This {open_quotes}one mine-one design{close_quotes} approach, while cost-effective in the past, is now being replaced by a more critical analysis of the design requirements of each area. Geotechnical evaluation plays an increasing role in the planning and operational aspects of lignite mining. Laboratory core sample test results can be used for slope stability modeling, in order to obtain more accurate design and operational information.« less

  8. Leadership Succession Management in a University Health Faculty

    ERIC Educational Resources Information Center

    McMurray, Anne M.; Henly, Debra; Chaboyer, Wendy; Clapton, Jayne; Lizzio, Alf; Teml, Martin

    2012-01-01

    We report on a succession planning pilot project in an Australian university health faculty. The programme aimed to enhance organisational stability and develop leadership capacity in middle level academics. Six monthly sessions addressed university and general leadership topics, communication, decision-making, working with change, self-management…

  9. Summary of findings of the R&D committee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenley, C.R.; Kokenge, B.R.

    1996-05-01

    In March 1995, the Department of Energy`s (DOE) Nuclear Materials Stabilization Task Group (NMST) chartered a committee to formulate a research and development (R&D) plan in response to Sub-recommendation (2) of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The NMSTG was established as an organizational unit operating under the auspices of the DOE Office of the Environmental Management. As a result of its efforts, the Research Committee concluded that, in general, the technology needs for stabilizing 94-1 nuclear materials are being adequately met by existing or planned DOE programs. At the same time, the committee, in the form ofmore » recommendations, noted specific R&D program areas that should be addressed by the NMSTG. These recommendations are documented in the R&D plan and formulated based on: (1) existing {open_quotes}gaps{close_quotes} in DOE`s R&D stabilization program, (2) the relative maturity of various technologies, and (3) other important R&D program issues that, in the judgement of the committee, should be addressed by the NMSTG. A systems engineering approach, derived form the aerospace industry, was applied to the various stabilization technologies to assess their relative maturity and availability for use in treating 94-1 nuclear materials.« less

  10. Aircrew-aircraft integration: A summary of US Army research programs and plans

    NASA Technical Reports Server (NTRS)

    Key, D. L.; Aiken, E. W.

    1984-01-01

    A review of selected programs which illustrate the research efforts of the U.S. Army Aeromechanics Laboratory in the area of aircrew-aircraft integration is presented. Plans for research programs to support the development of future military rotorcraft are also described. The crew of a combat helicopter must, in general, perform two major functions during the conduct of a particular mission: flightpath control and mission management. Accordingly, the research programs described are being conducted in the same two major categories: (1) flightpath control, which encompasses the areas of handling qualities, stability and control, and displays for the pilot's control of the rotorcraft's flightpath, and (2) mission management, which includes human factors and cockpit integration research topics related to performance of navigation, communication, and aircraft systems management tasks.

  11. 76 FR 42124 - Availability of the Incident Waste Management Planning and Response Tool

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... to stabilize agriculture production, the food supply, and the economy, rapidly remove and effectively dispose of contaminated agriculture and food products or infected plants and animals, and decontaminate... further contamination or spread of disease. The IWMPRT is a suite of decision support tools developed by...

  12. A key to success: optimizing the planning process

    NASA Astrophysics Data System (ADS)

    Turk, Huseyin; Karakaya, Kamil

    2014-05-01

    By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air operation planning process is analyzed according to a comprehensive approach. The difficulties of planning are identified. Consequently, for optimizing a decisionmaking process of an air operation, a planning process is identified in a virtual command and control structure.

  13. Developing the academic nursing practice in the midst of new realities in higher education.

    PubMed

    Miller, Karen L; Bleich, Michael R; Hathaway, Donna; Warren, Carol

    2004-02-01

    The academic nursing practice has a role in replenishing the diminished resources that confront higher education and, if well conceived and managed, is a viable option to support existing academic program stability and growth. An alternative model for defining the academic practice--beyond traditional nurse-managed centers--is presented in this article. The cohesive interconnection of the education, research, and practice missions is addressed with examples of how each contributes to a variety of communities of interest and expands professional nursing roles through innovative care model testing and development. With effective business planning and infrastructure support, faculty practice plans can evolve to a second generation, with heightened societal accountability for service, academic, and collaborative research outcomes.

  14. Career Anchors and the Effects of Downsizing: Implications for Generations and Cultures at Work. A Preliminary Investigation.

    ERIC Educational Resources Information Center

    Marshall, Verena; Bonner, Dede

    2003-01-01

    The relationships among career anchors, age, culture, gender, employment experience, and the impact of career planning on downsizing were examined with data from 423 management students (49% had been downsized). Lifestyle was the most valued anchor across age groups, stability/security the least; compared with Schein's earlier anchors research,…

  15. Managing aggression in the emergency department: promoting an interdisciplinary approach.

    PubMed

    Rintoul, Yvonne; Wynaden, Dianne; McGowan, Sunita

    2009-04-01

    Incidents of aggression are frequent occurrences in hospitals, particularly the emergency department. Aggression creates instability in the environment, impacts on patient care outcomes and leads to increased levels of stress in staff. Regular exposure to aggression in the workplace can have detrimental effects on health professionals' ongoing quality of life. The emergency department is a gateway to care and is heavily populated 24h a day. Therefore, it is essential that all health professionals are confident and well prepared to manage aggression. Based upon a review of the literature this paper outlines the causes of aggression and provides an interdisciplinary action plan for intervening with aggressive patients in the emergency department. The importance of interdisciplinary ownership and the well planned management of aggression are outlined. When well managed, the impact of aggression can be limited. Stability in the emergency department ensures that health professionals can be responsive to the community's needs for emergency care. This leads to the provision of effective and timely care and a stable work environment for all health professionals.

  16. MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS

    NASA Astrophysics Data System (ADS)

    Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi

    Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.

  17. Hospital management contracts: institutional and community perspectives.

    PubMed Central

    Wheeler, J R; Zuckerman, H S

    1984-01-01

    Previous studies have shown that external management by contract can improve the performance of managed hospitals. This article presents a conceptual framework which develops specific hypotheses concerning improved hospital operating efficiency, increased ability to meet hospital objectives, and increased ability to meet community objectives. Next, changes in the process and structure of management under contractual arrangements, based on observations from two not-for-profit hospital systems, are described. Finally, the effects of these management changes over time on hospital and community objectives are presented. These effects suggest progressive stages in the development of management contracts. The first stage focuses on stabilizing hospital financial performance. Stage two involves recruitment and retention efforts to secure necessary personnel. In the third stage, attention shifts to strategic planning and marketing. PMID:6490378

  18. Many-Objective Robust Decision Making: Managing Water in a Deeply Uncertain World of Change (Invited)

    NASA Astrophysics Data System (ADS)

    Reed, P. M.

    2013-12-01

    Water resources planning and management has always required the consideration of uncertainties and the associated system vulnerabilities that they may cause. Despite the long legacy of these issues, our decision support frameworks that have dominated the literature over the past 50 years have struggled with the strongly multiobjective and deeply uncertain nature of water resources systems. The term deep uncertainty (or Knightian uncertainty) refers to factors in planning that strongly shape system risks that maybe unknown and even if known there is a strong lack of consensus on their likelihoods over decadal planning horizons (population growth, financial stability, valuation of resources, ecosystem requirements, evolving water institutions, regulations, etc). In this presentation, I will propose and demonstrate the many-objective robust decision making (MORDM) framework for water resources management under deep uncertainty. The MORDM framework will be demonstrated using an urban water portfolio management test case. In the test case, a city in the Lower Rio Grande Valley managing population and drought pressures must cost effectively maintain the reliability of its water supply by blending permanent rights to reservoir inflows with alternative strategies for purchasing water within the region's water market. The case study illustrates the significant potential pitfalls in the classic Cost-Reliability conception of the problem. Moreover, the proposed MORDM framework exploits recent advances in multiobjective search, visualization, and sensitivity analysis to better expose these pitfalls en route to identifying highly robust water planning alternatives.

  19. Implementation plan for underground waste storage tank surveillance and stabilization improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dukelow, G.T.; Maupin, V.D.; Mihalik, L.A.

    1989-04-01

    Several studies have addressed the need to upgrade the methods currently used for surveillance of underground waste storage tanks, particularly single-shell tanks (SST), which are susceptible to leaks and intrusions. Fifty tasks were proposed to enhance the existing surveillance program; however, prudent budget management dictates that only the tasks with the highest potential for success be selected and funded. This plan identifies fourteen inexpensive improvements that may be implemented in less than two years. Recent developments stress the need to complete interim stabilization of these tanks more quickly than now budgeted and to identify methods to salvage or eliminate themore » interstitial liquid left behind after saltwell jet-pumping. The plan calls for the use of available resources to remove saltwell liquid from SSTs as rapidly as possible rather than committing to new surveillance technologies that might not lead to near-term improvements. This plan describes the selection criteria and provides cost estimates and schedules for implementing the recommendations of the task forces. The proposed improvements result in completion of jet-pumping in FY 1994, two years ahead of the current FY 1996 milestone. While the accelerated plan requires more funding in the early years, the total cost will be the same as completing the work in FY 1996.« less

  20. Regional economic analysis of current and proposed management alternatives for Rappahannock River Valley National Wildlife Refuge

    USGS Publications Warehouse

    Koontz, Lynne; Sexton, Natalie; Donovan, Ryan

    2009-01-01

    The National Wildlife Refuge System Improvement Act of 1997 requires all units of the National Wildlife Refuge System to be managed under a Comprehensive Conservation Plan. The Comprehensive Conservation Plan must describe the desired future conditions of a refuge and provide long-range guidance and management direction to achieve refuge purposes. The Rappahannock River Valley National Wildlife Refuge (refuge) is in the process of developing a range of management goals, objectives, and strategies for the Comprehensive Conservation Plan. The Comprehensive Conservation Plan for the refuge must contain an analysis of expected effects associated with current and proposed refuge management strategies. The purpose of this study was to assess the regional economic implications associated with draft Comprehensive Conservation Plan management strategies. Special interest groups and local residents often criticize a change in refuge management, especially if there is a perceived negative impact to the local economy. Having objective data on economic impacts may show that these fears are overstated. Quite often, the extent of economic benefits a refuge provides to a local community is not fully recognized, yet at the same time the effects of negative changes is overstated. Spending associated with refuge recreational activities, such as wildlife viewing and hunting, can generate considerable tourist activity for surrounding communities. Additionally, refuge personnel typically spend considerable amounts of money purchasing supplies in local stores, repairing equipment and purchasing fuel at the local service stations, and reside and spend their salaries in the local community. For refuge Comprehensive Conservation Plan planning, a regional economic assessment provides a means of estimating how current management (no action alternative) and proposed management activities (alternatives) could affect the local economy. This type of analysis provides two critical pieces of information: (1) it illustrates a refuge's contribution to the local community; and (2) it can help in determining whether local economic effects are or are not a real concern in choosing among management alternatives. It is important to note that the economic value of a refuge encompasses more than just the impacts of the regional economy. Refuges also provide substantial nonmarket values (values for items not exchanged in established markets), such as maintaining endangered species, preserving wetlands, educating future generations, and adding stability to the ecosystem. However, quantifying these types of nonmarket values was beyond the scope of this study because of time and budget constraints.

  1. Influence of forest and rangeland management on anadromous fish habitat in Western North America: planning forest roads to protect salmonid habitat.

    Treesearch

    Carlton S. Yee; Terry D. Roelofs

    1980-01-01

    The construction and existence of forest roads, landings, and decking areas may have significant effects on anadromous fish habitat . Major effects discussed in this paper are increased sedimentation from transportation networks, the hindrance to fish migration of drainage structures, and possible changes in water quality from road stabilization additives. Guidelines...

  2. How to measure the outcomes of chronic disease management.

    PubMed

    Lewis, Al

    2009-02-01

    The fastest-growing methodology for disease management outcomes measurement is valid, transparent, easy to apply, and freely available in the public domain and this article. It measures the actual goal of disease management, which is to reduce the rate of adverse events associated with the disease(s) being managed. Changes in this rate can be translated into a return on investment using some explicit assumptions about comorbidities and episode costs. Outcomes measured in this way show that in the health plan community as a whole, disease management in the broadest sense is working, as measured by the relative stability in the rate of adverse medical events closely associated with common chronic disease during this decade of increasing prevalence of most of the common chronic conditions.

  3. Differences in the Management of Pediatric Facial Trauma

    PubMed Central

    Braun, Tara L.; Xue, Amy S.; Maricevich, Renata S.

    2017-01-01

    Craniofacial trauma is common in the pediatric population, with most cases limited to soft tissue and dentoalveolar injury. Although facial fractures are relatively rare in children compared with adults, they are often associated with severe injury and cause significant morbidity and disability. Initial evaluation of a child with facial trauma generally involves stabilizing the patient and identifying any severe concomitant injuries before diagnosing and managing facial injuries. The management of pediatric facial fractures is relatively more conservative than that of adults, and nonsurgical management is preferred when possible to prevent the disruption of future growth and development. Outcomes depend on the site of the injury, management plan, and subsequent growth, so children must be followed longitudinally for monitoring and the identification of any complications. PMID:28496392

  4. STS-1 medical report

    NASA Technical Reports Server (NTRS)

    Pool, S. L. (Editor); Johnson, P. C., Jr. (Editor); Mason, J. A. (Editor)

    1981-01-01

    The report includes a review of the health of the crew before, during and immediately after the first Shuttle orbital flight (April 12-14, 1981). Areas reviewed include: health evaluation, medical debriefing of crewmembers, health stabilization program, medical training, medical kit carried inflight; tests and countermeasures for space motion sickness, cardiovascular profile, biochemistry and endocrinology results; hematology and immunology analyses; medical microbiology; food and nutrition; potable water; shuttle toxicology; radiological health; cabin acoustical noise. Also included is information on: environmental effects of Shuttle launch and landing, medical information management; and management, planning and implementation of the medical program.

  5. Attrition and erosion: assessment and diagnosis.

    PubMed

    Meyers, Ian

    2012-04-01

    The management of patients with extensively worn and badly broken down dentitions presents a difficult challenge in dental practice and restorative treatments are often complex, time consuming and costly to implement, so careful case selection and treatment planning is essential. Ultimately the success of any restorative intervention is very dependent on the stability of the oral environment and the status of the remaining tooth structure. Prior to the commencement of any restorative treatment an understanding of the importance of the disease process, the risk factors in the mouth, and the intrinsic and extrinsic factors which affect the oral balance is critical. While there is a growing range of materials and techniques available for cost effective and conservative management of these cases, failure to take a systematic approach to assessment and stabilization may result in early restorative failure, rapid recurrence of the problems and a repeat restoration cycle. Therefore successful management of these patients must include an appropriate mix of preventive and restorative strategies.

  6. Using corporate finance to engineer an organizational turnaround.

    PubMed

    Sussman, Jason H; Dziesinski, Ray R

    2002-11-01

    Georgia's Southern Regional Medical Center used a proven corporate finance approach to dramatically improve its financial position and integrate its strategic and financial planning. Managers throughout the organization were educated about principles of corporate finance. Reliable cash-flow projections were used to create a multiyear glide path to financial stability. Initiatives were tied to specific time frames and quantifiable financial goals and underwent a standardized review process.

  7. The complete "how to" guide for selecting a disease management vendor.

    PubMed

    Linden, Ariel; Roberts, Nancy; Keck, Kevin

    2003-01-01

    Decision-makers in health plans, large medical groups, and self-insured employers face many challenges in selecting and implementing disease management programs. One strategy is the "buy" approach, utilizing one or more of the many vendors to provide disease management services for the purchasing organization. As a relatively new field, the disease management vendor landscape is continually changing, uncovering the many uncertainties about demonstrating outcomes, corporate stability, or successful business models. Given the large investment an organization may make in each disease management program (many cost 1 million dollars or more in annual fees for a moderately sized population), careful consideration must be given in selecting a disease management partner. This paper describes, in detail, the specific steps necessary and the issues to consider in achieving a successful contract with a vendor for full-service disease management.

  8. An inexact mixed risk-aversion two-stage stochastic programming model for water resources management under uncertainty.

    PubMed

    Li, W; Wang, B; Xie, Y L; Huang, G H; Liu, L

    2015-02-01

    Uncertainties exist in the water resources system, while traditional two-stage stochastic programming is risk-neutral and compares the random variables (e.g., total benefit) to identify the best decisions. To deal with the risk issues, a risk-aversion inexact two-stage stochastic programming model is developed for water resources management under uncertainty. The model was a hybrid methodology of interval-parameter programming, conditional value-at-risk measure, and a general two-stage stochastic programming framework. The method extends on the traditional two-stage stochastic programming method by enabling uncertainties presented as probability density functions and discrete intervals to be effectively incorporated within the optimization framework. It could not only provide information on the benefits of the allocation plan to the decision makers but also measure the extreme expected loss on the second-stage penalty cost. The developed model was applied to a hypothetical case of water resources management. Results showed that that could help managers generate feasible and balanced risk-aversion allocation plans, and analyze the trade-offs between system stability and economy.

  9. Technology for space station

    NASA Astrophysics Data System (ADS)

    Colladay, R. S.; Carlisle, R. F.

    1984-10-01

    Some of the most significant advances made in the space station discipline technology program are examined. Technological tasks and advances in the areas of systems/operations, environmental control and life support systems, data management, power, thermal considerations, attitude control and stabilization, auxiliary propulsion, human capabilities, communications, and structures, materials, and mechanisms are discussed. An overview of NASA technology planning to support the initial space station and the evolutionary growth of the space station is given.

  10. Atrial Macroreentry in Congenital Heart Disease

    PubMed Central

    Twomey, Darragh J; Sanders, Prashanthan; Roberts-Thomson, Kurt C

    2015-01-01

    Macroreentrant atrial tachycardia is a common complication following surgery for congenital heart disease (CHD), and is often highly symptomatic with potentially significant hamodynamic consequences. Medical management is often unsuccessful, requiring the use of invasive procedures. Cavotricuspid isthmus dependent flutter is the most common circuit but atypical circuits also exist, involving sites of surgical intervention or areas of scar related to abnormal hemodynamics. Ablation can be technically challenging, due to complex anatomy, and difficulty with catheter stability. A thorough assessment of the pa-tients status and pre-catheter ablation planning is critical to successfully managing these patients. PMID:25308809

  11. STS-3 medical report

    NASA Technical Reports Server (NTRS)

    Pool, S. L. (Editor); Johnson, P. C., Jr. (Editor); Mason, J. A. (Editor)

    1982-01-01

    The medical operations report for STS-3, which includes a review of the health of the crew before, during, and immediately after the third Shuttle orbital flight is presented. Areas reviewed include: health evaluation, medical debriefing of crewmembers, health stabilization program, medical training, medical 'kit' carried in flight, tests and countermeasures for space motion sickness, cardiovascular profile, biochemistry and endocrinology results, hematology and immunology analyses, medical microbiology, food and nutrition, potable water, shuttle toxicology, radiological health, and cabin acoustic noise. Environmental effects of shuttle launch and landing medical information management, and management, planning, and implementation of the medical program are also dicussed.

  12. PUREX/UO{sub 3} deactivation project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retainedmore » during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.« less

  13. Robustness of mission plans for unmanned aircraft

    NASA Astrophysics Data System (ADS)

    Niendorf, Moritz

    This thesis studies the robustness of optimal mission plans for unmanned aircraft. Mission planning typically involves tactical planning and path planning. Tactical planning refers to task scheduling and in multi aircraft scenarios also includes establishing a communication topology. Path planning refers to computing a feasible and collision-free trajectory. For a prototypical mission planning problem, the traveling salesman problem on a weighted graph, the robustness of an optimal tour is analyzed with respect to changes to the edge costs. Specifically, the stability region of an optimal tour is obtained, i.e., the set of all edge cost perturbations for which that tour is optimal. The exact stability region of solutions to variants of the traveling salesman problems is obtained from a linear programming relaxation of an auxiliary problem. Edge cost tolerances and edge criticalities are derived from the stability region. For Euclidean traveling salesman problems, robustness with respect to perturbations to vertex locations is considered and safe radii and vertex criticalities are introduced. For weighted-sum multi-objective problems, stability regions with respect to changes in the objectives, weights, and simultaneous changes are given. Most critical weight perturbations are derived. Computing exact stability regions is intractable for large instances. Therefore, tractable approximations are desirable. The stability region of solutions to relaxations of the traveling salesman problem give under approximations and sets of tours give over approximations. The application of these results to the two-neighborhood and the minimum 1-tree relaxation are discussed. Bounds on edge cost tolerances and approximate criticalities are obtainable likewise. A minimum spanning tree is an optimal communication topology for minimizing the cumulative transmission power in multi aircraft missions. The stability region of a minimum spanning tree is given and tolerances, stability balls, and criticalities are derived. This analysis is extended to Euclidean minimum spanning trees. This thesis aims at enabling increased mission performance by providing means of assessing the robustness and optimality of a mission and methods for identifying critical elements. Examples of the application to mission planning in contested environments, cargo aircraft mission planning, multi-objective mission planning, and planning optimal communication topologies for teams of unmanned aircraft are given.

  14. SDO Delta H Mode Design and Analysis

    NASA Technical Reports Server (NTRS)

    Mason, Paul A.; Starin, Scott R.

    2007-01-01

    While on orbit, disturbance torques on a three axis stabilized spacecraft tend to increase the system momentum, which is stored in the reaction wheels. Upon reaching the predefined momentum capacity (or maximum wheel speed) of the reaction wheel, an external torque must be used to unload the momentum. The purpose of the Delta H mode is to manage the system momentum. This is accomplished by driving the reaction wheels to a target momentum state while the attitude thrusters, which provide an external torque, are used to maintain the attitude. The Delta H mode is designed to meet the mission requirements and implement the momentum management plan. Changes in the requirements or the momentum management plan can lead to design changes in the mode. The momentum management plan defines the expected momentum buildup trend, the desired momentum state and how often the system is driven to the desired momentum state (unloaded). The desired momentum state is chosen based on wheel capacity, wheel configuration, thruster layout and thruster sizing. For the Solar Dynamics Observatory mission, the predefined wheel momentum capacity is a function of the jitter requirements, power, and maximum momentum capacity. Changes in jitter requirements or power limits can lead to changes in the desired momentum state. These changes propagate into the changes in the momentum management plan and therefore the Delta H mode design. This paper presents the analysis and design performed for the Solar Dynamics Observatory Delta H mode. In particular, the mode logic and processing needed to meet requirements is described along with the momentum distribution formulation. The Delta H mode design is validated using the Solar Dynamics Observatory High Fidelity simulator. Finally, a summary of the design is provided along with concluding remarks.

  15. Weather-centric rangeland revegetation planning

    USGS Publications Warehouse

    Hardegree, Stuart P.; Abatzoglou, John T.; Brunson, Mark W.; Germino, Matthew; Hegewisch, Katherine C.; Moffet, Corey A.; Pilliod, David S.; Roundy, Bruce A.; Boehm, Alex R.; Meredith, Gwendwr R.

    2018-01-01

    Invasive annual weeds negatively impact ecosystem services and pose a major conservation threat on semiarid rangelands throughout the western United States. Rehabilitation of these rangelands is challenging due to interannual climate and subseasonal weather variability that impacts seed germination, seedling survival and establishment, annual weed dynamics, wildfire frequency, and soil stability. Rehabilitation and restoration outcomes could be improved by adopting a weather-centric approach that uses the full spectrum of available site-specific weather information from historical observations, seasonal climate forecasts, and climate-change projections. Climate data can be used retrospectively to interpret success or failure of past seedings by describing seasonal and longer-term patterns of environmental variability subsequent to planting. A more detailed evaluation of weather impacts on site conditions may yield more flexible adaptive-management strategies for rangeland restoration and rehabilitation, as well as provide estimates of transition probabilities between desirable and undesirable vegetation states. Skillful seasonal climate forecasts could greatly improve the cost efficiency of management treatments by limiting revegetation activities to time periods where forecasts suggest higher probabilities of successful seedling establishment. Climate-change projections are key to the application of current environmental models for development of mitigation and adaptation strategies and for management practices that require a multidecadal planning horizon. Adoption of new weather technology will require collaboration between land managers and revegetation specialists and modifications to the way we currently plan and conduct rangeland rehabilitation and restoration in the Intermountain West.

  16. NASA strategic plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  17. Risk Management and Adaptation Transition Mechanisms and Pathways in New York City

    NASA Astrophysics Data System (ADS)

    Link, H. D.

    2016-12-01

    Understanding the values that drive current decision-making is essential to effective management of critical urban infrastructure. As urban infrastructure becomes increasingly interconnected, risks in one sector can translate to citywide risk in the flash of a photon or the blink of an eye. Approaches and goals of risk management vary across geographies. Administrators and residents attempt to reduce vulnerability to hazards and limit the scope of disasters in different ways in different contexts. Public and personal risk management decision making regimes are complex and often shifting. While the overarching goal is to try to reduce the level of risk faced by stakeholders in a particular locale, the conditions and changing character of local risk management decisions are affected by physical, economic and social factors. Opportunities for meaningful action are found at this nexus. To illuminate this nexus, this paper provides a detailed discussion and analysis of the New York City risk management regime and its trajectory as defined by local experts. The risk focus of the analysis is storm surge and flooding, and heat stress. The analysis examines the factors that enable movement and transition between different adaptive regimes, and on factors that support lock-in of current regime status The research utilizes a risk management framework based on four policy states developed for the Transformation and Resilience in the Urban Coast (TRUC) project (Solecki et al. 2016). "Collapse"; a state where there is no strategic risk planning; "Resistance"; risk planning that is directed at stability and aims at protecting current development pathways; "Resilience"; flexible planning that aims at introducing some changes to maintain current development, and "Transformation"; planning for fundamental changes in risk management including changing development choices and paths to accommodate uncertainty and future risk scenarios. (Solecki et al. 2016). To examine the risk management approach in New York City and the conditions for transition researchers gathered primary data - the results of an interactive risk management pathways workshop held in New York City and follow on, face-to-face interviews with local risk managers and stakeholders.

  18. Technical area status report for waste destruction and stabilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dalton, J.D.; Harris, T.L.; DeWitt, L.M.

    1993-08-01

    The Office of Environmental Restoration and Waste Management (EM) was established by the Department of Energy (DOE) to direct and coordinate waste management and site remediation programs/activities throughout the DOE complex. In order to successfully achieve the goal of properly managing waste and the cleanup of the DOE sites, the EM was divided into five organizations: the Office of Planning and Resource Management (EM-10); the Office of Environmental Quality Assurance and Resource Management (EM-20); the Office of Waste Operations (EM-30); the Office of Environmental Restoration (EM-40); and the Office of Technology and Development (EM-50). The mission of the Office ofmore » Technology Development (OTD) is to develop treatment technologies for DOE`s operational and environmental restoration wastes where current treatment technologies are inadequate or not available. The Mixed Waste Integrated Program (MWIP) was created by OTD to assist in the development of treatment technologies for the DOE mixed low-level wastes (MLLW). The MWIP has established five Technical Support Groups (TSGs) whose purpose is to identify, evaluate, and develop treatment technologies within five general technical areas representing waste treatment functions from initial waste handling through generation of final waste forms. These TSGs are: (1) Front-End Waste Handling, (2) Physical/Chemical Treatment, (3) Waste Destruction and Stabilization, (4) Second-Stage Destruction and Offgas Treatment, and (5) Final Waste Forms. This report describes the functions of the Waste Destruction and Stabilization (WDS) group. Specifically, the following items are discussed: DOE waste stream identification; summary of previous efforts; summary of WDS treatment technologies; currently funded WDS activities; and recommendations for future activities.« less

  19. Strategic Shift: Appraising Recent Changes in U.S. Defense Plans and Priorities

    DTIC Science & Technology

    2013-04-29

    NDU Press, 2012). 9 Neyla Arnas and Warren Fishbein, Actionable Foresight Project, Center for Technology and National Security Policy, in...management, At the same time, leaders had to account for changes in warfare. This included changes across the range of combat bred by the...into account the ongoing stability operations in Iraq and Afghanistan. In it, U.S. forces would be sized in order to: a. Conduct a major

  20. To Stay or Not to Stay: Non-Combatant Evacuation Operations and Their Impact on Host Nation/Regional Stability

    DTIC Science & Technology

    2014-06-13

    School in partial satisfaction of the requirements of a Master of Science Degree in Joint Campaign Planning and Strategy. The contents of this...conflicted claims. Japan, Taiwan, Vietnam, Malaysia , Philippines and Brunei have continued to assert their territorial claims which have resulted in...In the United States, budget constraints and sequestration avoidance remain a concern as the administration and Congress manage the budget

  1. Stability Ops In The Western Hemisphere (CALL Newsletter, Number 11-15, February 2011)

    DTIC Science & Technology

    2011-02-01

    Marulanda died on March 26, 2008. June 6 Colombia and Ecuador announce plans to restore full diplomatic relations. June-July Ecuadorean government ...and a continuing menace for Ecuador . On April 13, 2008, the Colombian government issued a communiqué stating that President Correa had prevented... governments . 3. Based on the events of March 1, 2008, the rudimentary system for early warning and crisis management between Colombia and Ecuador

  2. 46 CFR 170.180 - Plans and information required at the stability test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Displacement and Centers of Gravity § 170.180 Plans and information required at the stability test. The owner...) Capacity plans showing capacities and vertical and longitudinal centers of gravity of stowage spaces and...

  3. 46 CFR 170.180 - Plans and information required at the stability test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Displacement and Centers of Gravity § 170.180 Plans and information required at the stability test. The owner...) Capacity plans showing capacities and vertical and longitudinal centers of gravity of stowage spaces and...

  4. 46 CFR 170.180 - Plans and information required at the stability test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Displacement and Centers of Gravity § 170.180 Plans and information required at the stability test. The owner.... (c) Capacity plans showing capacities and vertical and longitudinal centers of gravity of stowage...

  5. 46 CFR 170.180 - Plans and information required at the stability test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Displacement and Centers of Gravity § 170.180 Plans and information required at the stability test. The owner...) Capacity plans showing capacities and vertical and longitudinal centers of gravity of stowage spaces and...

  6. 46 CFR 170.180 - Plans and information required at the stability test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Displacement and Centers of Gravity § 170.180 Plans and information required at the stability test. The owner...) Capacity plans showing capacities and vertical and longitudinal centers of gravity of stowage spaces and...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.

    The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric powermore » transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.« less

  8. Shuttle OFT medical report: Summary of medical results from STS-1, STS-2, STS-3, and STS-4

    NASA Technical Reports Server (NTRS)

    Pool, S. L. (Editor); Johnson, P. C., Jr. (Editor); Mason, J. A. (Editor)

    1983-01-01

    The medical operations for the orbital test flights which includes a review of the health of the crews before, during, and immediately after the four shuttle orbital flights are reported. Health evaluation, health stabilization program, medical training, medical "kit" carried in flight, tests and countermeasures for space motion sickness, cardiovascular, biochemistry and endocrinology results, hematology and immunology analyses, medical microbiology, food and nutrition, potable water, Shuttle toxicology, radiological health, and cabin acoustical noise are reviewed. Information on environmental effects of Shuttle launch and landing, medical information management, and management, planning, and implementation of the medical program are included.

  9. Management of the maxillary cancer patient--what the general dentist should know.

    PubMed

    Karunagaran, Sanjay; Markose, Sony C; Paprocki, Gregory J

    2013-01-01

    Maxillary defects are created following surgical treatment of patients with benign and malignant neoplasms, trauma or congenital defects. The size of these defects influences the degree of debilitation. This patient lacks the conventional support, stability and retention when fabrication of the prosthesis is planned. The prosthesis that is used to close this palatal defect is called the hollow bulb obturator. CLINICAL OUTCOMES: It improves speech, deglutition, esthetics and function for the patient.

  10. Independent External Peer Review Report of the Dredged Material Management Plan for Green Bay, Wisconsin

    DTIC Science & Technology

    2011-06-27

    collapse Independent External Peer Review Report – Green Bay 20 June 2011 B-4 ► Geisler & Kay, Madison, WI, 1981, on steel pipe corrosion ...Hillsboro Stormwater dry basin development and ravine stabilization, Montgomery County, Ill. Wind Farm avian surveys, DeKalb and Pike Counties, Ill., and...site in Houston, Texas, the construction of landfills in New York and Massachusetts, and removal of solidified sludge from two 20-acre basins in

  11. A summary of lateral-stability derivatives calculated for wing plan forms in supersonic flow

    NASA Technical Reports Server (NTRS)

    Jones, Arthur L; Alksne, Alberta

    1951-01-01

    A compilation of theoretical values of the lateral-stability derivatives for wings at supersonic speeds is presented in the form of design charts. The wing plan forms for which this compilation has been prepared include a rectangular, two trapezoidal, two triangular, a fully-tapered swept-back, a sweptback hexagonal, an unswept hexagonal, and a notched triangular plan form. A full set of results, that is, values for all nine of the lateral-stability derivatives for wings, was available for the first six of these plan forms only. The reasons for the incompleteness of the results available for other plan forms are discussed.

  12. A qualitative content analysis of global health engagements in Peacekeeping and Stability Operations Institute's stability operations lessons learned and information management system.

    PubMed

    Nang, Roberto N; Monahan, Felicia; Diehl, Glendon B; French, Daniel

    2015-04-01

    Many institutions collect reports in databases to make important lessons-learned available to their members. The Uniformed Services University of the Health Sciences collaborated with the Peacekeeping and Stability Operations Institute to conduct a descriptive and qualitative analysis of global health engagements (GHEs) contained in the Stability Operations Lessons Learned and Information Management System (SOLLIMS). This study used a summative qualitative content analysis approach involving six steps: (1) a comprehensive search; (2) two-stage reading and screening process to identify first-hand, health-related records; (3) qualitative and quantitative data analysis using MAXQDA, a software program; (4) a word cloud to illustrate word frequencies and interrelationships; (5) coding of individual themes and validation of the coding scheme; and (6) identification of relationships in the data and overarching lessons-learned. The individual codes with the most number of text segments coded included: planning, personnel, interorganizational coordination, communication/information sharing, and resources/supplies. When compared to the Department of Defense's (DoD's) evolving GHE principles and capabilities, the SOLLIMS coding scheme appeared to align well with the list of GHE capabilities developed by the Department of Defense Global Health Working Group. The results of this study will inform practitioners of global health and encourage additional qualitative analysis of other lessons-learned databases. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.

  13. Predicting the Future: Delivery Room Planning of Congenital Heart Disease Diagnosed by Fetal Echocardiography.

    PubMed

    Donofrio, Mary T

    2018-05-01

    Advances in prenatal imaging have improved the examination of the fetal cardiovascular system. Fetal echocardiography facilitates the prenatal diagnosis of congenital heart disease (CHD) and through sequential examination, allows assessment of fetal cardiac hemodynamics, predicting the evolution of anatomical and functional cardiovascular abnormalities in utero and during the transition to a postnatal circulation at delivery. This approach allows detailed diagnosis with prenatal counseling and enables planning to define perinatal management, selecting the fetuses at a risk of postnatal hemodynamic instability who are likely to require a specialized delivery plan. The prenatal diagnosis and management of critical neonatal CHD has been shown to play an important role in improving the outcome of newborns with these conditions, allowing timely stabilization of the circulation prior to cardiac intervention or surgery, thus reducing the risk of perioperative morbidity and mortality. Diagnostic protocols aimed at risk-stratifying severity and potential postnatal compromise in fetuses with CHD have been developed to identify those who may require special intervention at birth or within the first days of life. In addition, new methodologies are being studied to improve the accuracy of prediction of disease severity. Perinatal management of neonates with a prenatal diagnosis of CHD requires a close collaboration between obstetric, neonatal, and cardiology services. In this article, the management of fetuses with CHD will be discussed, along with summarizing the in utero and fetal echocardiographic findings used for risk stratification of newborns with CHD and reviewing the basic principles used for planning for neonatal resuscitation and initial transitional care of these complex newborns. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  14. Multi-Objective Differential Evolution for Voltage Security Constrained Optimal Power Flow in Deregulated Power Systems

    NASA Astrophysics Data System (ADS)

    Roselyn, J. Preetha; Devaraj, D.; Dash, Subhransu Sekhar

    2013-11-01

    Voltage stability is an important issue in the planning and operation of deregulated power systems. The voltage stability problems is a most challenging one for the system operators in deregulated power systems because of the intense use of transmission line capabilities and poor regulation in market environment. This article addresses the congestion management problem avoiding offline transmission capacity limits related to voltage stability by considering Voltage Security Constrained Optimal Power Flow (VSCOPF) problem in deregulated environment. This article presents the application of Multi Objective Differential Evolution (MODE) algorithm to solve the VSCOPF problem in new competitive power systems. The maximum of L-index of the load buses is taken as the indicator of voltage stability and is incorporated in the Optimal Power Flow (OPF) problem. The proposed method in hybrid power market which also gives solutions to voltage stability problems by considering the generation rescheduling cost and load shedding cost which relieves the congestion problem in deregulated environment. The buses for load shedding are selected based on the minimum eigen value of Jacobian with respect to the load shed. In the proposed approach, real power settings of generators in base case and contingency cases, generator bus voltage magnitudes, real and reactive power demands of selected load buses using sensitivity analysis are taken as the control variables and are represented as the combination of floating point numbers and integers. DE/randSF/1/bin strategy scheme of differential evolution with self-tuned parameter which employs binomial crossover and difference vector based mutation is used for the VSCOPF problem. A fuzzy based mechanism is employed to get the best compromise solution from the pareto front to aid the decision maker. The proposed VSCOPF planning model is implemented on IEEE 30-bus system, IEEE 57 bus practical system and IEEE 118 bus system. The pareto optimal front obtained from MODE is compared with reference pareto front and the best compromise solution for all the cases are obtained from fuzzy decision making strategy. The performance measures of proposed MODE in two test systems are calculated using suitable performance metrices. The simulation results show that the proposed approach provides considerable improvement in the congestion management by generation rescheduling and load shedding while enhancing the voltage stability in deregulated power system.

  15. After flow control: The steps taken by Dade County to ensure continued operation of its solid waste management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauriello, P.J.; Ragbeer, D.

    1997-12-01

    In the wake of the U.S. Supreme Court decision in the Carbone vs. Clarkstown case striking down waste flow control as unconstitutional, Dade County, Florida, one of the most severely impacted communities in the nation, has managed to stabilize its waste stream and balance its solid waste department finances; although the road taken to restabilization has been a difficult one. At its peak in 1995, Dade County experienced an annual loss of solid waste in excess of 1,000,000 tons, or over 40 percent of the waste stream normally handled by the County. This diversion of waste was accompanied by amore » net revenue loss of $30 million per year. The County lost its ability to plan for future capacity needs, or to assure sufficient future waste flows to meet its put-or-pay obligation to the County`s Resources Recovery plant operator. The County`s solid waste management system bonds were downgraded by Moody`s Investors Service and Standard and Poors. With the help of a special solid waste management team, appointed by the County Manager, the department was able to rightsize its waste disposal operations to fit its reduced waste flows, stabilize its waste stream, and develop strategies to solve its long-term funding shortfall.« less

  16. Preparing the Army for Stability Operations: Doctrinal and Interagency Issues

    DTIC Science & Technology

    2007-01-01

    discuss these issues at length in Chapter Three). Similarly, the Draft Planning Framework is not yet part of the military planning process. It remains a...Draft Planning Framework for Reconstruction, Stabilization, and Conflict Transformation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 The...level from the perspective of impli- cations for the Army and its development of SSTR capabilities. The U.S. Government Draft Planning Framework for

  17. EMR Database Upgrade from MUMPS to CACHE: Lessons Learned.

    PubMed

    Alotaibi, Abduallah; Emshary, Mshary; Househ, Mowafa

    2014-01-01

    Over the past few years, Saudi hospitals have been implementing and upgrading Electronic Medical Record Systems (EMRs) to ensure secure data transfer and exchange between EMRs.This paper focuses on the process and lessons learned in upgrading the MUMPS database to a the newer Caché database to ensure the integrity of electronic data transfer within a local Saudi hospital. This paper examines the steps taken by the departments concerned, their action plans and how the change process was managed. Results show that user satisfaction was achieved after the upgrade was completed. The system was stable and offered better healthcare quality to patients as a result of the data exchange. Hardware infrastructure upgrades improved scalability and software upgrades to Caché improved stability. The overall performance was enhanced and new functions were added (CPOE) during the upgrades. The essons learned were: 1) Involve higher management; 2) Research multiple solutions available in the market; 3) Plan for a variety of implementation scenarios.

  18. Space Station Technology, 1983

    NASA Technical Reports Server (NTRS)

    Wright, R. L. (Editor); Mays, C. R. (Editor)

    1984-01-01

    This publication is a compilation of the panel summaries presented in the following areas: systems/operations technology; crew and life support; EVA; crew and life support: ECLSS; attitude, control, and stabilization; human capabilities; auxillary propulsion; fluid management; communications; structures and mechanisms; data management; power; and thermal control. The objective of the workshop was to aid the Space Station Technology Steering Committee in defining and implementing a technology development program to support the establishment of a permanent human presence in space. This compilation will provide the participants and their organizations with the information presented at this workshop in a referenceable format. This information will establish a stepping stone for users of space station technology to develop new technology and plan future tasks.

  19. RECOVER: An Automated Cloud-Based Decision Support System for Post-fire Rehabilitation Planning

    NASA Technical Reports Server (NTRS)

    Schnase, John L.; Carroll, Mark; Weber, K. T.; Brown, Molly E.; Gill, Roger L.; Wooten, Margaret; May J.; Serr, K.; Smith, E.; Goldsby, R.; hide

    2014-01-01

    RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.

  20. RECOVER: An Automated, Cloud-Based Decision Support System for Post-Fire Rehabilitation Planning

    NASA Astrophysics Data System (ADS)

    Schnase, J. L.; Carroll, M. L.; Weber, K. T.; Brown, M. E.; Gill, R. L.; Wooten, M.; May, J.; Serr, K.; Smith, E.; Goldsby, R.; Newtoff, K.; Bradford, K.; Doyle, C.; Volker, E.; Weber, S.

    2014-11-01

    RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.

  1. American power conference: Proceedings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    The first volume of this conference contains papers on the following topics: (1) Controls, monitoring, and expert systems (Harnessing microprocessor revolution for a more competitive power industry; Plant control--Upgrades; Neural network applications); (2) Diversification and globalization (Electric utility diversification/globalization--Panel; Private power in developing countries); (3) Environment and clean air (Clean Air compliance costs; Site selection for power stations and related facilities; Electric utility trace substance emissions; Solid waste disposal and commercial use; Precipitators/fabric filters; and Effect of flow modifications on fisheries and water quality); (4) Generation--Fuel options equipment (Alternate fuels; Advances in fuel cells for electric power applications; Secondary containmentmore » and seismic requirements for petrochemical facilities; Clean coal technology demonstration; Advanced energy systems; Hydropower); (5) Nuclear operations options (Radioactive waste management and disposal; Off normal conditions; Advanced light water reactors--15 years after TMI; Structural dynamic analyses for nuclear power plants); (6) Retrofit, betterment, repowering maintenance (Project management; Improving competitiveness through process re-engineering; Central stations; Water and wastewater treatment); (7) System planning, operation demand maintenance (Transmission system access; Stability; Systems planning); (8) Transmission and distribution (Transformers; Relaying for system protection; Managing EMF effects); and (9) Education (Power engineering). 155 papers have been processed separately for inclusion on the data base.« less

  2. Assimilable organic carbon (AOC) variation in reclaimed water: Insight on biological stability evaluation and control for sustainable water reuse.

    PubMed

    Chen, Zhuo; Yu, Tong; Ngo, Huu Hao; Lu, Yun; Li, Guoqiang; Wu, Qianyuan; Li, Kuixiao; Bai, Yu; Liu, Shuming; Hu, Hong-Ying

    2018-04-01

    This review highlights the importance of conducting biological stability evaluation due to water reuse progression. Specifically, assimilable organic carbon (AOC) has been identified as a practical indicator for microbial occurrence and regrowth which ultimately influence biological stability. Newly modified AOC bioassays aimed for reclaimed water are introduced. Since elevated AOC levels are often detected after tertiary treatment, the review emphasizes that actions can be taken to either limit AOC levels prior to disinfection or conduct post-treatment (e.g. biological filtration) as a supplement to chemical oxidation based approaches (e.g. ozonation and chlorine disinfection). During subsequent distribution and storage, microbial community and possible microbial regrowth caused by complex interactions are discussed. It is suggested that microbial surveillance, AOC threshold values, real-time field applications and surrogate parameters could provide additional information. This review can be used to formulate regulatory plans and strategies, and to aid in deriving relevant control, management and operational guidance. Copyright © 2018 Elsevier Ltd. All rights reserved.

  3. The future of employer-sponsored retiree medical plans.

    PubMed

    Rappaport, A M; Kalman, R W

    1987-01-01

    Complex issues cloud the economic security of people who are covered by employer-sponsored retiree medical plans. The future stability of these plans is especially confusing. In their paper, the authors carefully analyze the current structure of retiree medical plans, including the effect of certain laws. Their clarifications are objective and concise. Of particular timeliness and practicality--particularly for public policy markers--is the authors' four-point strategy to help stabilize the future.

  4. [Management of spinal metastasis by minimal invasive surgery technique: Surgical principles, indications: A literature review].

    PubMed

    Toquart, A; Graillon, T; Mansouri, N; Adetchessi, T; Blondel, B; Fuentes, S

    2016-06-01

    Spinal metastasis are getting more frequent. This raises the question of pain and neurological complications, which worsen the functional and survival prognosis of this oncological population patients. The surgical treatment must be the most complete as possible: to decompress and stabilize without delaying the management of the oncological disease. Minimal invasive surgery techniques are by definition, less harmful on musculocutaneous plan than opened ones, with a comparable efficiency demonstrated in degenerative and traumatic surgery. So they seem to be applicable and appropriate to this patient population. We detailed different minimal invasive techniques proposed in the management of spinal metastasis. For this, we used our experience developed in degenerative and traumatic pathologies, and we also referred to many authors, establishing a literature review thanks to Pubmed, Embase. Thirty eight articles were selected and allowed us to describe different techniques: percutaneous methods such as vertebro-/kyphoplasty and osteosynthesis, as well as mini-opened surgery, through a posterior or anterior way. We propose a surgical approach using these minimal invasive techniques, first according to the predominant symptom (pain or neurologic failure), then characteristics of the lesions (number, topography, type…) and the deformity degree. Whatever the technique, the main goal is to stabilize and decompress, in order to maintain a good quality of life for these fragile patients, without delaying the medical management of the oncological disease. Copyright © 2016 Elsevier Masson SAS. All rights reserved.

  5. Test Plan for SSR Antenna Rotation Rate Stabilization

    DOT National Transportation Integrated Search

    1981-10-01

    A comprehensive test plan is presented to evaluate the impact of wind and ice loading on the rotation rate stability of a Secondary Surveillance Radar (SSR) antenna used for air traffic control surveillance. Antenna rotation rate variations may intro...

  6. Model or Myopia? Exploiting Water Markets to Address Population and Drought Risks in a Changing World

    NASA Astrophysics Data System (ADS)

    Reed, P. M.

    2012-12-01

    Climate change, population demands, and evolving land-use represent strong risks to the sustainable development and stability of world-wide urban water supplies. There is a growing consensus that non-structural supply management instruments such as water markets have significant potential to reduce the risks and vulnerabilities in complex urban water systems. This paper asks a common question, what are the tradeoffs for a city using water market supply instruments?. This question emerges quickly in policy and management, but its answer is deceptively difficult to attain using traditional planning tools and management frameworks. This research demonstrates new frameworks that facilitate rapid evaluation of hypotheses on the reliability, resiliency, adaptability, and cost-effectiveness of urban water supply systems. This study considers a broader exploration of the issues of "nonstationarity" and "uncertainty" in urban water planning. As we invest in new information and prediction frameworks for the coupled human-natural systems that define our water, our problem definitions (i.e., objectives, constraints, preferences, and hypotheses) themselves evolve. From a formal mathematical perspective, this means that our management problems are structurally uncertain and nonstationary (i.e., the definition of optimality changes across regions, times, and stakeholders). This uncertainty and nonstationarity in our problem definitions needs to be more explicitly acknowledged in adaptive management and integrated water resources management. This study demonstrates the potential benefits of exploring these issues in the context of a city in the Lower Rio Grande Valley (LRGV) of Texas, USA determining how to use its regional water market to manage population and drought risks.

  7. Astrophysics and Cosmology: International Partnerships

    NASA Astrophysics Data System (ADS)

    Blandford, Roger

    2016-03-01

    Most large projects in astrophysics and cosmology are international. This raises many challenges including: --Aligning the sequence of: proposal, planning, selection, funding, construction, deployment, operation, data mining in different countries --Managing to minimize cost growth through reconciling different practices --Communicating at all levels to ensure a successful outcome --Stabilizing long term career opportunities. There has been considerable progress in confronting these challenges. Lessons learned from past collaborations are influencing current facilities but much remains to be done if we are to optimize the scientific and public return on the expenditure of financial and human resources.

  8. Force-Based Reasoning for Assembly Planning and Subassembly Stability Analysis

    NASA Technical Reports Server (NTRS)

    Lee, S.; Yi, C.; Wang, F-C.

    1993-01-01

    In this paper, we show that force-based reasoning, for identifying a cluster of parts that can be decomposed naturally by the applied force, plays an important role in selecting feasible subassemblies and analyzing subassembly stability in assembly planning.

  9. Understanding the dynamics in distribution of invasive alien plant species under predicted climate change in Western Himalaya

    PubMed Central

    Chitale, Vishwas; Rijal, Srijana Joshi; Bisht, Neha; Shrestha, Bharat Babu

    2018-01-01

    Invasive alien plant species (IAPS) can pose severe threats to biodiversity and stability of native ecosystems, therefore, predicting the distribution of the IAPS plays a crucial role in effective planning and management of ecosystems. In the present study, we use Maximum Entropy (MaxEnt) modelling approach to predict the potential of distribution of eleven IAPS under future climatic conditions under RCP 2.6 and RCP 8.5 in part of Kailash sacred landscape region in Western Himalaya. Based on the model predictions, distribution of most of these invasive plants is expected to expand under future climatic scenarios, which might pose a serious threat to the native ecosystems through competition for resources in the study area. Native scrublands and subtropical needle-leaved forests will be the most affected ecosystems by the expansion of these IAPS. The present study is first of its kind in the Kailash Sacred Landscape in the field of invasive plants and the predictions of potential distribution under future climatic conditions from our study could help decision makers in planning and managing these forest ecosystems effectively. PMID:29664961

  10. Understanding the dynamics in distribution of invasive alien plant species under predicted climate change in Western Himalaya.

    PubMed

    Thapa, Sunil; Chitale, Vishwas; Rijal, Srijana Joshi; Bisht, Neha; Shrestha, Bharat Babu

    2018-01-01

    Invasive alien plant species (IAPS) can pose severe threats to biodiversity and stability of native ecosystems, therefore, predicting the distribution of the IAPS plays a crucial role in effective planning and management of ecosystems. In the present study, we use Maximum Entropy (MaxEnt) modelling approach to predict the potential of distribution of eleven IAPS under future climatic conditions under RCP 2.6 and RCP 8.5 in part of Kailash sacred landscape region in Western Himalaya. Based on the model predictions, distribution of most of these invasive plants is expected to expand under future climatic scenarios, which might pose a serious threat to the native ecosystems through competition for resources in the study area. Native scrublands and subtropical needle-leaved forests will be the most affected ecosystems by the expansion of these IAPS. The present study is first of its kind in the Kailash Sacred Landscape in the field of invasive plants and the predictions of potential distribution under future climatic conditions from our study could help decision makers in planning and managing these forest ecosystems effectively.

  11. Low weight and overweightness in older adults: risk and clinical management.

    PubMed

    Jahangir, Eiman; De Schutter, Alban; Lavie, Carl J

    2014-01-01

    The prevalence of individuals who are overweight or obese is growing exponentially in the United States and worldwide. This growth is concerning, as both overweightness and obesity lead to impaired physical function, decreased quality of life, and increased risk of chronic diseases. Additionally, overweightness and obesity are related to increased mortality among young and middle-aged adults. This weight-related risk of mortality is more ambiguous among older adults. In fact, obesity may be protective in this population, a relationship described as the "obesity paradox". In this review we discuss the effects of overweightness and obesity among the elderly on cardiovascular disease and all-cause mortality, along with the risks of low weight. We conclude by discussing the goal of weight management among older adults, focusing particularly on benefits of preserving lean body mass and muscular strength while stabilizing body fat. Ideally, overweight or mildly obese elderly individuals should devise a plan with their physicians to maintain their weight, while increasing lean body mass through a plan of healthy diet, behavioral therapy, and physical activity. Copyright © 2014 Elsevier Inc. All rights reserved.

  12. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  13. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  14. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  15. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  16. National Athletic Trainers' Association Position Statement: Acute Management of the Cervical Spine–Injured Athlete

    PubMed Central

    Swartz, Erik E; Boden, Barry P; Courson, Ronald W; Decoster, Laura C; Horodyski, MaryBeth; Norkus, Susan A; Rehberg, Robb S; Waninger, Kevin N

    2009-01-01

    Objective: To provide certified athletic trainers, team physicians, emergency responders, and other health care professionals with recommendations on how to best manage a catastrophic cervical spine injury in the athlete. Background: The relative incidence of catastrophic cervical spine injury in sports is low compared with other injuries. However, cervical spine injuries necessitate delicate and precise management, often involving the combined efforts of a variety of health care providers. The outcome of a catastrophic cervical spine injury depends on the efficiency of this management process and the timeliness of transfer to a controlled environment for diagnosis and treatment. Recommendations: Recommendations are based on current evidence pertaining to prevention strategies to reduce the incidence of cervical spine injuries in sport; emergency planning and preparation to increase management efficiency; maintaining or creating neutral alignment in the cervical spine; accessing and maintaining the airway; stabilizing and transferring the athlete with a suspected cervical spine injury; managing the athlete participating in an equipment-laden sport, such as football, hockey, or lacrosse; and considerations in the emergency department. PMID:19478836

  17. Estimation of Directional Stability Derivatives at Moderate Angles and Supersonic Speeds

    NASA Technical Reports Server (NTRS)

    Kaattari, George E.

    1959-01-01

    A study of some of the important aerodynamic factors affecting the directional stability of supersonic airplanes is presented. The mutual interference fields between the body, the lifting surfaces, and the stabilizing surfaces are analyzed in detail. Evaluation of these interference fields on an approximate theoretical basis leads to a method for predicting directional stability of supersonic airplanes. Body shape, wing position and plan form, vertical tail position and plan form, and ventral fins are taken into account. Estimates of the effects of these factors are in fair agreement with experiment.

  18. Plutonium inventories for stabilization and stabilized materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, A.K.

    1996-05-01

    The objective of the breakout session was to identify characteristics of materials containing plutonium, the need to stabilize these materials for storage, and plans to accomplish the stabilization activities. All current stabilization activities are driven by the Defense Nuclear Facilities Safety Board Recommendation 94-1 (May 26, 1994) and by the recently completed Plutonium ES&H Vulnerability Assessment (DOE-EH-0415). The Implementation Plan for accomplishing stabilization of plutonium-bearing residues in response to the Recommendation and the Assessment was published by DOE on February 28, 1995. This Implementation Plan (IP) commits to stabilizing problem materials within 3 years, and stabilizing all other materials withinmore » 8 years. The IP identifies approximately 20 metric tons of plutonium requiring stabilization and/or repackaging. A further breakdown shows this material to consist of 8.5 metric tons of plutonium metal and alloys, 5.5 metric tons of plutonium as oxide, and 6 metric tons of plutonium as residues. Stabilization of the metal and oxide categories containing greater than 50 weight percent plutonium is covered by DOE Standard {open_quotes}Criteria for Safe Storage of Plutonium Metals and Oxides{close_quotes} December, 1994 (DOE-STD-3013-94). This standard establishes criteria for safe storage of stabilized plutonium metals and oxides for up to 50 years. Each of the DOE sites and contractors with large plutonium inventories has either started or is preparing to start stabilization activities to meet these criteria.« less

  19. Health plan competition in local markets.

    PubMed

    Grossman, J M

    2000-04-01

    To examine the structure of local health insurance markets and the strategies health plans were using to respond to competitive pressures in local markets in 1996/1997. Community Tracking Study site visits conducted between May 1996 and April 1997 in 12 U.S. markets selected to be nationally representative. In each site, 36 to 60 interviews on local health system change were conducted with healthcare industry informants representing health plans, providers, and purchasers. Relevant data for this article were abstracted from standardized protocols administered to multiple respondents in each site. Although the competitive threat from national plans was pervasive, local plans in most sites continued to retain strong, often dominant, positions in historically concentrated markets. In all sites, in response to purchaser pressures for stable premiums and provider choice, and the threat of entry and to plans were using three strategies to increase market share and market power: (1) consolidation/geographic expansion, (2) price competition, and (3) product line/segment diversification that focused on broad networks and open-access products. In most markets, in response to the demand for provider choice, the trend was away from ownership and exclusive arrangements with providers. Although local plans were moving to become full-service regional players, there was uncertainty about the abilities of all plans to sustain growth strategies at the expense of margins and organizational stability, and to effectively manage care with broad networks.

  20. 46 CFR 170.085 - Information required before a stability test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Information required before a stability test. 170.085... STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Plan Approval § 170.085 Information required before a stability test. If a stability test is to be performed, a stability test procedure that contains...

  1. 46 CFR 170.085 - Information required before a stability test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Information required before a stability test. 170.085... STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Plan Approval § 170.085 Information required before a stability test. If a stability test is to be performed, a stability test procedure that contains...

  2. 46 CFR 170.085 - Information required before a stability test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Information required before a stability test. 170.085... STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Plan Approval § 170.085 Information required before a stability test. If a stability test is to be performed, a stability test procedure that contains...

  3. Management of Hypothalamic Obesity during Transition from Childhood to Adulthood.

    PubMed

    Bretault, Marion; Carette, Claire; Barsamian, Charles; Czernichow, Sébastien

    2018-01-01

    Hypothalamic obesity (HO) is a rare and serious disease of various origins: tumor, traumatism, radiotherapy, vascular, genetic, or even psychotropic drug use. HO usually begins in childhood with eating disorders and progresses with an aggregate of severe comorbidities. Transition from pediatric to adult health care is a critical period to assure weight stability and a good management of comorbidities. In case of loss to follow-up, there is an increased risk of major weight gain and long-term complications with severe obesity. To minimize this risk, pediatric and adult specialists must work together to prepare, supervise, and monitor transition. Transition ideally involves the patient, parents, and care providers with a good communication between pediatric and adult teams from expert centers. Maintaining a diet and physical activity management plan, acquisition of autonomy for hormone replacement therapy and management of psychosocial consequences of obesity are fundamental issues in patients with HO. Patient associations and specialized diet center weight loss programs can help as well as group approaches. © 2018 S. Karger AG, Basel.

  4. Planning the Transition to Long-Term Stewardship for the River Corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cearlock, C.S.; Lerch, J.A.; Sands, J.P.

    2007-07-01

    Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less

  5. 36 CFR 219.2 - Levels of planning and responsible officials.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...

  6. 76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...

  7. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  8. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  9. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  10. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  11. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  12. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  13. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  14. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  15. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  17. Annual report to Congress. Department of Energy activities relating to the Defense Nuclear Facilities Safety Board, calendar year 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2001-03-01

    This Annual Report to the Congress describes the Department of Energy's activities in response to formal recommendations and other interactions with the Defense Nuclear Facilities Safety Board. During 2000, the Department completed its implementation and proposed closure of one Board recommendation and completed all implementation plan milestones associated with two additional Board recommendations. Also in 2000, the Department formally accepted two new Board recommendations and developed implementation plans in response to those recommendations. The Department also made significant progress with a number of broad-based safety initiatives. These include initial implementation of integrated safety management at field sites and within headquartersmore » program offices, issuance of a nuclear safety rule, and continued progress on stabilizing excess nuclear materials to achieve significant risk reduction.« less

  18. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  19. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  20. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  1. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  2. Optimism in Enrollment Management

    ERIC Educational Resources Information Center

    Buster-Williams, Kimberley

    2016-01-01

    Enrollment managers, like most managers, have goals that must be focused on with precision, excitement, and vigor. Enrollment managers must excel at enrollment planning. Typically, enrollment planning unites undergraduate and graduate recruitment plans, out-of-state recruitment plans, marketing plans, retention plans, international enrollment…

  3. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  4. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  5. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  6. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  7. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  8. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  9. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  10. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  11. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  12. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management...

  13. Comparison of circummandibular wiring with resorbable bone plates in pediatric mandibular fractures.

    PubMed

    Saikrishna, D; Gupta, Nimish

    2010-06-01

    Pediatric patients present a unique challenge to maxillofacial surgeons in terms of their treatment planning as well as in their functional and nutritional needs which are different from that of adult patients. Early literature has advocated conservative closed management of pediatric fractures to prevent complications. However recent advances in maxillofacial surgery has enabled us to use biodegradable plates and screws, which overcomes the limitations of metallic plates. We present a comparison of two cases of parasymphysis fracture treated with circum-mandibular wiring and biodegradable plate fixation their outcome in terms of fracture healing and functional stability.

  14. The IASI cold box subsystem (CBS) a passive cryocooler for cryogenic detectors and optics

    NASA Astrophysics Data System (ADS)

    Bailly, B.; Courteau, P.; Maciaszek, T.

    2017-11-01

    In space, cooling down Infra Red detectors and optics to cryogenic temperature raises always the same issue : what is the best way to manage simultaneously thermal cooling, stability, mechanical discoupling and accurate focal plane components location, in a lightweight and compact solution? The passive cryocooler developed by Alcatel SPace Industries under CNES contract in the frame of the IASI instrument (Infrared Atmospheric Sounding Interferometer), offers an efficient solution for 90K to 100K temperature levels. We intend you to present the architecture and performance validation plan of the CBS.

  15. Perinatal Care of Infants with Congenital Birth Defects.

    PubMed

    Sewell, Elizabeth K; Keene, Sarah

    2018-06-01

    Prenatal diagnosis has changed perinatal medicine dramatically, allowing for additional fetal monitoring, referral and counseling, delivery planning, the option of fetal intervention, and targeted postnatal management. Teams participating in the delivery room care of infants with known anomalies should be knowledgeable about specific needs and expectations but also ready for unexpected complications. A small number of neonates will need rapid access to postnatal interventions, such as surgery, but most can be stabilized with appropriate neonatal care. These targeted perinatal interventions have been shown to improve outcome in selected diagnoses. Copyright © 2018 Elsevier Inc. All rights reserved.

  16. Longitudinal data analysis in support of functional stability concepts for leachate management at closed municipal landfills

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibbons, Robert D., E-mail: rdg@uchicago.edu; Morris, Jeremy W.F., E-mail: jmorris@geosyntec.com; Prucha, Christopher P., E-mail: cprucha@wm.com

    2014-09-15

    Highlights: • Longitudinal data analysis using a mixed-effects regression model. • Dataset consisted of a total of 1402 samples from 101 closed municipal landfills. • Target analytes and classes generally showed predictable degradation trends. • Validates historical studies focused on macro organic indicators such as BOD. • BOD can serve as “gateway” indicator for planning leachate management. - Abstract: Landfill functional stability provides a target that supports no environmental threat at the relevant point of exposure in the absence of active control systems. With respect to leachate management, this study investigates “gateway” indicators for functional stability in terms of themore » predictability of leachate characteristics, and thus potential threat to water quality posed by leachate emissions. Historical studies conducted on changes in municipal solid waste (MSW) leachate concentrations over time (longitudinal analysis) have concentrated on indicator compounds, primarily chemical oxygen demand (COD) and biochemical oxygen demand (BOD). However, validation of these studies using an expanded database and larger constituent sets has not been performed. This study evaluated leachate data using a mixed-effects regression model to determine the extent to which leachate constituent degradation can be predicted based on waste age or operational practices. The final dataset analyzed consisted of a total of 1402 samples from 101 MSW landfills. Results from the study indicated that all leachate constituents exhibit a decreasing trend with time in the post-closure period, with 16 of the 25 target analytes and aggregate classes exhibiting a statistically significant trend consistent with well-studied indicators such as BOD. Decreasing trends in BOD concentration after landfill closure can thus be considered representative of trends for many leachate constituents of concern.« less

  17. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  18. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  19. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  20. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  1. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  2. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... 25 Indians 1 2011-04-01 2011-04-01 false Forest management planning and sustained yield management... management planning for Indian forest land shall be carried out through participation in the development and...

  3. 46 CFR 170.085 - Information required before a stability test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Information required before a stability test. 170.085 Section 170.085 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Plan Approval § 170.085 Information required before a stability test. If a stability test is t...

  4. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  5. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  6. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  7. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  8. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for... Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  9. Principles of effective USA federal fire management plans

    USGS Publications Warehouse

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  10. Health plan competition in local markets.

    PubMed Central

    Grossman, J M

    2000-01-01

    OBJECTIVE: To examine the structure of local health insurance markets and the strategies health plans were using to respond to competitive pressures in local markets in 1996/1997. DATA SOURCES/STUDY SETTING: Community Tracking Study site visits conducted between May 1996 and April 1997 in 12 U.S. markets selected to be nationally representative. STUDY DESIGN: In each site, 36 to 60 interviews on local health system change were conducted with healthcare industry informants representing health plans, providers, and purchasers. DATA COLLECTION/EXTRACTION METHOD: Relevant data for this article were abstracted from standardized protocols administered to multiple respondents in each site. PRINCIPAL FINDINGS: Although the competitive threat from national plans was pervasive, local plans in most sites continued to retain strong, often dominant, positions in historically concentrated markets. In all sites, in response to purchaser pressures for stable premiums and provider choice, and the threat of entry and to plans were using three strategies to increase market share and market power: (1) consolidation/geographic expansion, (2) price competition, and (3) product line/segment diversification that focused on broad networks and open-access products. In most markets, in response to the demand for provider choice, the trend was away from ownership and exclusive arrangements with providers. CONCLUSIONS: Although local plans were moving to become full-service regional players, there was uncertainty about the abilities of all plans to sustain growth strategies at the expense of margins and organizational stability, and to effectively manage care with broad networks. PMID:10778822

  11. 25 CFR 166.312 - Is a conservation plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Operations Management Management Plans and Environmental Compliance § 166.312 Is a conservation plan required... resource management plan and must address the permittee's management objectives regarding animal husbandry...

  12. A Game Theory Algorithm for Intra-Cluster Data Aggregation in a Vehicular Ad Hoc Network

    PubMed Central

    Chen, Yuzhong; Weng, Shining; Guo, Wenzhong; Xiong, Naixue

    2016-01-01

    Vehicular ad hoc networks (VANETs) have an important role in urban management and planning. The effective integration of vehicle information in VANETs is critical to traffic analysis, large-scale vehicle route planning and intelligent transportation scheduling. However, given the limitations in the precision of the output information of a single sensor and the difficulty of information sharing among various sensors in a highly dynamic VANET, effectively performing data aggregation in VANETs remains a challenge. Moreover, current studies have mainly focused on data aggregation in large-scale environments but have rarely discussed the issue of intra-cluster data aggregation in VANETs. In this study, we propose a multi-player game theory algorithm for intra-cluster data aggregation in VANETs by analyzing the competitive and cooperative relationships among sensor nodes. Several sensor-centric metrics are proposed to measure the data redundancy and stability of a cluster. We then study the utility function to achieve efficient intra-cluster data aggregation by considering both data redundancy and cluster stability. In particular, we prove the existence of a unique Nash equilibrium in the game model, and conduct extensive experiments to validate the proposed algorithm. Results demonstrate that the proposed algorithm has advantages over typical data aggregation algorithms in both accuracy and efficiency. PMID:26907272

  13. A Game Theory Algorithm for Intra-Cluster Data Aggregation in a Vehicular Ad Hoc Network.

    PubMed

    Chen, Yuzhong; Weng, Shining; Guo, Wenzhong; Xiong, Naixue

    2016-02-19

    Vehicular ad hoc networks (VANETs) have an important role in urban management and planning. The effective integration of vehicle information in VANETs is critical to traffic analysis, large-scale vehicle route planning and intelligent transportation scheduling. However, given the limitations in the precision of the output information of a single sensor and the difficulty of information sharing among various sensors in a highly dynamic VANET, effectively performing data aggregation in VANETs remains a challenge. Moreover, current studies have mainly focused on data aggregation in large-scale environments but have rarely discussed the issue of intra-cluster data aggregation in VANETs. In this study, we propose a multi-player game theory algorithm for intra-cluster data aggregation in VANETs by analyzing the competitive and cooperative relationships among sensor nodes. Several sensor-centric metrics are proposed to measure the data redundancy and stability of a cluster. We then study the utility function to achieve efficient intra-cluster data aggregation by considering both data redundancy and cluster stability. In particular, we prove the existence of a unique Nash equilibrium in the game model, and conduct extensive experiments to validate the proposed algorithm. Results demonstrate that the proposed algorithm has advantages over typical data aggregation algorithms in both accuracy and efficiency.

  14. Recommendations for the evaluation of specimen stability for flow cytometric testing during drug development.

    PubMed

    Brown, Lynette; Green, Cherie L; Jones, Nicholas; Stewart, Jennifer J; Fraser, Stephanie; Howell, Kathy; Xu, Yuanxin; Hill, Carla G; Wiwi, Christopher A; White, Wendy I; O'Brien, Peter J; Litwin, Virginia

    2015-03-01

    The objective of this manuscript is to present an approach for evaluating specimen stability for flow cytometric methods used during drug development. While this approach specifically addresses stability assessment for assays to be used in clinical trials with centralized testing facilities, the concepts can be applied to any stability assessment for flow cytometric methods. The proposed approach is implemented during assay development and optimization, and includes suggestions for designing a stability assessment plan, data evaluation and acceptance criteria. Given that no single solution will be applicable in all scenarios, this manuscript offers the reader a roadmap for stability assessment and is intended to guide the investigator during both the method development phase and in the experimental design of the validation plan. Copyright © 2015 Elsevier B.V. All rights reserved.

  15. Impacts of Landuse Management and Climate Change on Landslides Susceptibility over the Olympic Peninsula of Washington State

    NASA Astrophysics Data System (ADS)

    Barik, M. G.; Adam, J. C.

    2009-12-01

    The commercial forests on the western side of the Olympic Mountains in Washington State are a region of steep slopes and high annual rainfall (2500-6000 mm/year) and are therefore highly susceptible to landslides. Potential climatic change (more intense and frequent winter storms) may exacerbate landslide susceptibility unless forest management practices are changed. As this area is a critical habitat for numerous organisms, including salmon, this may result in potentially severe consequences to riparian habitat due to increased sediment loads. Therefore, there is a need to investigate potential forest management plans to promote the economic viability of timber extraction while protecting the natural habitat, particularly in riparian areas. The objective of this study is to predict the long term effects of forest management decisions under projected climate change on slope stability. We applied the physically-based Distributed Hydrology Soil Vegetation Model (DHSVM) with its sediment module to simulate mass wasting and sediment delivery under different vegetation and climate scenarios. Sub-basins were selected and classified according to elevation, slope, land cover and soil type. Various land management practices (such as clear-cutting in riparian areas, logging under short rotations, varying amount of timbers left intact in riparian areas) were applied to each of the selected sub-basins. DHSVM was used to simulate landslide volume, frequency, and sediment loads for each of the land cover applications under various future climate scenarios. We comment on the suitability of various harvesting techniques for different parts of the forest to minimize landslide-induced sediment loading to streams in an altered climate. This approach can be developed as a decision making tool that can be used by forest managers to make long-term planning decisions.

  16. Optimal implementation of best management practices to improve agricultural hydrology and water quality

    NASA Astrophysics Data System (ADS)

    Liu, Y.; Engel, B.; Collingsworth, P.; Pijanowski, B. C.

    2017-12-01

    Nutrient loading from the Maumee River watershed is a significant reason for the harmful algal blooms (HABs) problem in Lake Erie. Strategies to reduce nutrient loading from agricultural areas in the Maumee River watershed need to be explored. Best management practices (BMPs) are popular approaches for improving hydrology and water quality. Various scenarios of BMP implementation were simulated in the AXL watershed (an agricultural watershed in Maumee River watershed) using Soil and Water Assessment Tool (SWAT) and a new BMP cost tool to explore the cost-effectiveness of the practices. BMPs of interest included vegetative filter strips, grassed waterways, blind inlets, grade stabilization structures, wetlands, no-till, nutrient management, residue management, and cover crops. The following environmental concerns were considered: streamflow, Total Phosphorous (TP), Dissolved Reactive Phosphorus (DRP), Total Kjeldahl Nitrogen (TKN), and Nitrate+Nitrite (NOx). To obtain maximum hydrological and water quality benefits with minimum cost, an optimization tool was developed to optimally select and place BMPs by connecting SWAT, the BMP cost tool, and optimization algorithms. The optimization tool was then applied in AXL watershed to explore optimization focusing on critical areas (top 25% of areas with highest runoff volume/pollutant loads per area) vs. all areas of the watershed, optimization using weather data for spring (March to July, due to the goal of reducing spring phosphorus in watershed management plan) vs. full year, and optimization results of implementing BMPs to achieve the watershed management plan goal (reducing 2008 TP levels by 40%). The optimization tool and BMP optimization results can be used by watershed groups and communities to solve hydrology and water quality problems.

  17. Enhancing Cassini Operations & Science Planning Tools

    NASA Technical Reports Server (NTRS)

    Castello, Jonathan

    2012-01-01

    The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Edward J., Jr.; Henry, Karen Lynne

    Sandia National Laboratories develops technologies to: (1) sustain, modernize, and protect our nuclear arsenal (2) Prevent the spread of weapons of mass destruction; (3) Provide new capabilities to our armed forces; (4) Protect our national infrastructure; (5) Ensure the stability of our nation's energy and water supplies; and (6) Defend our nation against terrorist threats. We identified the need for a single overarching Integrated Workplace Management System (IWMS) that would enable us to focus on customer missions and improve FMOC processes. Our team selected highly configurable commercial-off-the-shelf (COTS) software with out-of-the-box workflow processes that integrate strategic planning, project management, facilitymore » assessments, and space management, and can interface with existing systems, such as Oracle, PeopleSoft, Maximo, Bentley, and FileNet. We selected the Integrated Workplace Management System (IWMS) from Tririga, Inc. Facility Management System (FMS) Benefits are: (1) Create a single reliable source for facility data; (2) Improve transparency with oversight organizations; (3) Streamline FMOC business processes with a single, integrated facility-management tool; (4) Give customers simple tools and real-time information; (5) Reduce indirect costs; (6) Replace approximately 30 FMOC systems and 60 homegrown tools (such as Microsoft Access databases); and (7) Integrate with FIMS.« less

  19. 76 FR 50494 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Resources Management Plan/Environmental Impact Statement for Mojave National Preserve. SUMMARY: Pursuant to... preparing a Water Resources Management Plan/Environmental Impact Statement (WRMP/EIS). This plan is intended...

  20. Integrating fire management analysis into land management planning

    Treesearch

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  1. Agricultural conservation planning framework: 2. Classification of riparian buffer design types with application to assess and map stream corridors.

    PubMed

    Tomer, M D; Boomer, K M B; Porter, S A; Gelder, B K; James, D E; McLellan, E

    2015-05-01

    A watershed's riparian corridor presents opportunities to stabilize streambanks, intercept runoff, and influence shallow groundwater with riparian buffers. This paper presents a system to classify these riparian opportunities and apply them toward riparian management planning in hydrologic unit code 12 watersheds. In two headwater watersheds from each of three landform regions found in Iowa and Illinois, high-resolution (3-m grid) digital elevation models were analyzed to identify spatial distributions of surface runoff contributions and zones with shallow water tables (SWTs) (within 1.5 m of the channel elevation) along the riparian corridors. Results were tabulated, and a cross classification was applied. Classes of buffers include those primarily placed to (i) trap runoff and sediment, (ii) influence shallow groundwater, (iii) address both runoff and shallow groundwater, and (iv) maintain/improve stream bank stability. Riparian buffers occupying about 2.5% of these six watersheds could effectively intercept runoff contributions from 81 to 94% of the watersheds' contributing areas. However, extents of riparian zones where a narrow buffer (<10 m wide) would adequately intercept runoff but where >25 m width of buffer vegetation could root to a SWT varied according to landform region ( < 0.10). Yet, these wide-SWT riparian zones were widespread and occupied 23 to 53% of the lengths of stream banks among the six watersheds. The wide-SWT setting provides opportunities to reduce dissolved nutrients (particularly NO-N) carried via groundwater. This riparian classification and mapping system is part of a ArcGIS toolbox and could provide a consistent basis to identify riparian management opportunities in Midwestern headwater catchments wherever high-resolution elevation data are available. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  2. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less

  3. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... interdisciplinary approach shall be used in the preparation, amendment and revision of resource management plans as... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING... and amendment of resource management plans may be provided by the Director and State Director, as...

  4. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  5. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  6. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must my waste management plan be... Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your...

  7. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  8. Wilderness fire management planning guide

    Treesearch

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  9. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  10. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  11. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  12. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  13. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  14. Basic principles of stability.

    PubMed

    Egan, William; Schofield, Timothy

    2009-11-01

    An understanding of the principles of degradation, as well as the statistical tools for measuring product stability, is essential to management of product quality. Key to this is management of vaccine potency. Vaccine shelf life is best managed through determination of a minimum potency release requirement, which helps assure adequate potency throughout expiry. Use of statistical tools such a least squares regression analysis should be employed to model potency decay. The use of such tools provides incentive to properly design vaccine stability studies, while holding stability measurements to specification presents a disincentive for collecting valuable data. The laws of kinetics such as Arrhenius behavior help practitioners design effective accelerated stability programs, which can be utilized to manage stability after a process change. Design of stability studies should be carefully considered, with an eye to minimizing the variability of the stability parameter. In the case of measuring the degradation rate, testing at the beginning and the end of the study improves the precision of this estimate. Additional design considerations such as bracketing and matrixing improve the efficiency of stability evaluation of vaccines.

  15. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  16. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  17. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Water quality management plans. 130.6 Section 130.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...

  18. Evaluation of Stakeholder-Driven Groundwater Management through Integrated Modeling and Remote Sensing in the US High Plains Aquifer

    NASA Astrophysics Data System (ADS)

    Deines, J. M.; Kendall, A. D.; Butler, J. J., Jr.; Hyndman, D. W.

    2017-12-01

    Irrigation greatly enhances agricultural yields and stabilizes farmer incomes, but overexploitation of water resources has depleted groundwater aquifers around the globe. In much of the High Plains Aquifer (HPA) in the United States, water-level declines threaten the continued viability of agricultural operations reliant on irrigation. Policy and management institutions to address this sustainability challenge differ widely across the HPA and the world. In Kansas, grassroots-driven legislation in 2012 allowed local stakeholder groups to establish Local Enhanced Management Areas (LEMAs) and work with state officials to generate enforceable and monitored water use reduction programs. The pioneering LEMA was formed in 2013, following a popular vote by farmers within a 256 km2 region in northwestern Kansas. The group sought to reduce groundwater pumping by 20% through 2017 in order to stabilize water levels while minimally reducing crop productivity. Initial statistical estimates indicate the LEMA has been successful; planning is underway to extend it for five years (2018-2022) and to implement additional LEMAs in the wider groundwater management district. Here, we assess the efficacy of this first LEMA with coupled crop-hydrology models to quantify water budget impacts and any associated trade-offs in crop productivity. We drive these models with a novel data fusion of water use data and our recent remotely sensed Annual Irrigation Maps (AIM) dataset, allowing detailed tracking of irrigation water in space and time. Results from these process-based models provide detailed insights into changes in the physical system resulting from the LEMA program that can inform future stakeholder-driven management in Kansas and in stressed aquifers around the world.

  19. 42 CFR 137.21 - How does an Indian Tribe demonstrate financial stability and financial management capacity?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false How does an Indian Tribe demonstrate financial stability and financial management capacity? 137.21 Section 137.21 Public Health PUBLIC HEALTH SERVICE... How does an Indian Tribe demonstrate financial stability and financial management capacity? The Indian...

  20. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  1. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  2. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false What information must be included in the legal management plan? 719.10 Section 719.10 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  3. LONG-RANGE PLANNING FOR SMALL BUSINESSES.

    DTIC Science & Technology

    MANAGEMENT PLANNING AND CONTROL, COMMERCE), (*COMMERCE, MANAGEMENT PLANNING AND CONTROL), PERSONNEL MANAGEMENT , PRODUCTION CONTROL, BUDGETS, OPERATIONS RESEARCH, ECONOMICS, DECISION MAKING, MANAGEMENT ENGINEERING

  4. 3/1/2018: Data Management Plan Webinar | National Agricultural Library

    Science.gov Websites

    News Contact Us Search  Log inRegister Home Home 3/1/2018: Data Management Plan Webinar Creating a Data Management Plan Webinar The original broadcast date of this webinar has passed, but you can view learn how to create a data management plan. Creating a Data Management Plan Tuesday, March 20 @ 1:00 PM

  5. 25 CFR 166.311 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... WATER GRAZING PERMITS Land and Operations Management Management Plans and Environmental Compliance § 166.311 Is an Indian agricultural resource management plan required? (a) Indian agricultural land under... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan...

  6. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...

  7. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...

  8. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction, reconstruction, or modification. ...

  9. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... when they are needed to address water quality problems. (1) Total maximum daily loads. TMDLs in...

  10. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  11. Development of Second Generation Intact Stability Criteria

    DTIC Science & Technology

    2011-12-01

    the intact stability performance of ships, have motivated the development of the second generation intact stability criteria by the IMO Subcommittee on...primary modes of stability failures which are being addressed. The second generation intact stability criteria are planned to have a multitiered structure...and 2 vulnerability criteria that are used as a preliminary design process check of dynamic stability failure risk. This report describes the U.S

  12. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What is a waste management plan? 62...

  13. 40 CFR 62.14432 - When must my waste management plan be completed?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must my waste management plan be... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On Or Before December 1, 2008 Waste Management Plan § 62.14432 When must my waste management plan be completed...

  14. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  15. Variable Width Riparian Model Enhances Landscape and Watershed Condition

    NASA Astrophysics Data System (ADS)

    Abood, S. A.; Spencer, L.

    2017-12-01

    Riparian areas are ecotones that represent about 1% of USFS administered landscape and contribute to numerous valuable ecosystem functions such as wildlife habitat, stream water quality and flows, bank stability and protection against erosion, and values related to diversity, aesthetics and recreation. Riparian zones capture the transitional area between terrestrial and aquatic ecosystems with specific vegetation and soil characteristics which provide critical values/functions and are very responsive to changes in land management activities and uses. Two staff areas at the US Forest Service have coordinated on a two phase project to support the National Forests in their planning revision efforts and to address rangeland riparian business needs at the Forest Plan and Allotment Management Plan levels. The first part of the project will include a national fine scale (USGS HUC-12 digits watersheds) inventory of riparian areas on National Forest Service lands in western United States with riparian land cover, utilizing GIS capabilities and open source geospatial data. The second part of the project will include the application of riparian land cover change and assessment based on selected indicators to assess and monitor riparian areas on annual/5-year cycle basis.This approach recognizes the dynamic and transitional nature of riparian areas by accounting for hydrologic, geomorphic and vegetation data as inputs into the delineation process. The results suggest that incorporating functional variable width riparian mapping within watershed management planning can improve riparian protection and restoration. The application of Riparian Buffer Delineation Model (RBDM) approach can provide the agency Watershed Condition Framework (WCF) with observed riparian area condition on an annual basis and on multiple scales. The use of this model to map moderate to low gradient systems of sufficient width in conjunction with an understanding of the influence of distinctive landscape settings (landtype associations as employed in the USFS Terrestrial Condition Assessment) on finer lower order stream characteristics and patterns presents much promise.

  16. Stabilization of marly soils with portland cement

    NASA Astrophysics Data System (ADS)

    Piskunov, Maksim; Karzin, Evgeny; Lukina, Valentina; Lukinov, Vitaly; Kholkin, Anatolii

    2017-10-01

    Stabilization of marlous soils with Portland cement will increase the service life of motor roads in areas where marl is used as a local road construction material. The result of the conducted research is the conclusion about the principal possibility of stabilization of marlous soils with Portland cement, and about the optimal percentage of the mineral part and the binding agent. When planning the experiment, a simplex-lattice plan was implemented, which makes it possible to obtain a mathematical model for changing the properties of a material in the form of polynomials of incomplete third order. Brands were determined for compressive strength according to GOST 23558-94 and variants of stabilized soils were proposed for road construction.

  17. Applying Aerodynamics Inspired Organizational Dynamic Fit Model Disaster Relief Endeavors

    DTIC Science & Technology

    2010-12-01

    gusts, and a dynamically stable organization returns quickly to its intended profit level, for instance, after deviation by changed consumer preferences . Hence...dynamic stability limits the level, for instance, by changed consumer preferences . Hence static stability limits initial performance... consumer preferences Maneuverability Quickness of a controlled system’s planned change from one trajectory to another Quickness of planned

  18. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...

  19. 30 CFR 71.301 - Respirable dust control plan; approval by District Manager and posting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... District Manager and posting. 71.301 Section 71.301 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... plan; approval by District Manager and posting. (a) The District Manager will approve respirable dust control plans on a mine-by-mine basis. When approving respirable dust control plans, the District Manager...

  20. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ...] Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior Planning Area... Management (BLM) Anchorage Field Office, Anchorage, Alaska, intends to prepare a Resource Management Plan... properties, visual resources, wildland fire management, lands with wilderness characteristics, forestry...

  1. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for..., 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...

  2. 25 CFR 161.200 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Is an Indian agricultural resource management plan... resource management plan required? (a) Yes, Navajo Partitioned Lands must be managed in accordance with the goals and objectives in the agricultural resource management plan developed by the Navajo Nation, or by...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harmon, K.M.; Lakey, L.T.; Leigh, I.W.

    Worldwide activities related to nuclear fuel cycle and radioactive waste management programs are summarized. Several trends have developed in waste management strategy: All countries having to dispose of reprocessing wastes plan on conversion of the high-level waste (HLW) stream to a borosilicate glass and eventual emplacement of the glass logs, suitably packaged, in a deep geologic repository. Countries that must deal with plutonium-contaminated waste emphasize pluonium recovery, volume reduction and fixation in cement or bitumen in their treatment plans and expect to use deep geologic repositories for final disposal. Commercially available, classical engineering processing are being used worldwide to treatmore » and immobilize low- and intermediate-level wastes (LLW, ILW); disposal to surface structures, shallow-land burial and deep-underground repositories, such as played-out mines, is being done widely with no obvious technical problems. Many countries have established extensive programs to prepare for construction and operation of geologic repositories. Geologic media being studied fall into three main classes: argillites (clay or shale); crystalline rock (granite, basalt, gneiss or gabbro); and evaporates (salt formations). Most nations plan to allow 30 years or longer between discharge of fuel from the reactor and emplacement of HLW or spent fuel is a repository to permit thermal and radioactive decay. Most repository designs are based on the mined-gallery concept, placing waste or spent fuel packages into shallow holes in the floor of the gallery. Many countries have established extensive and costly programs of site evaluation, repository development and safety assessment. Two other waste management problems are the subject of major R and D programs in several countries: stabilization of uranium mill tailing piles; and immobilization or disposal of contaminated nuclear facilities, namely reactors, fuel cycle plants and R and D laboratories.« less

  4. All-inside, anatomical lateral ankle stabilization for revision and complex primary lateral ankle stabilization: a technique guide.

    PubMed

    Prissel, Mark A; Roukis, Thomas S

    2014-12-01

    Lateral ankle instability is a common mechanical problem that often requires surgical management when conservative efforts fail. Historically, myriad open surgical approaches have been proposed. Recently, consideration for arthroscopic management of lateral ankle instability has become popular, with promising results. Unfortunately, recurrent inversion ankle injury following lateral ankle stabilization can occur and require revision surgery. To date, arthroscopic management for revision lateral ankle stabilization has not been described. We present a novel arthroscopic technique combining an arthroscopic lateral ankle stabilization kit with a suture anchor ligament augmentation system for revision as well as complex primary lateral ankle stabilization. © 2014 The Author(s).

  5. Wilderness management through voluntary behavior change: an evaluation of the Pemigewasset Wilderness Management Plan

    Treesearch

    John M. Halstead; Cindy M. Brown; Albert E. Luloff; Bruce E. Lindsay

    1992-01-01

    The management plan for the Pemigewasset Wilderness Area of New Hampshire represents a departure from traditional plans. Results of this study indicate limited evidence of the Pemigewasset Wilderness Management Plan (PWMP), as currently implemented, having a large direct impact on diverting hikers from their planned destinations and promoting dispersed usage and low...

  6. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...

  7. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...

  8. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...

  9. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...

  10. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  11. 76 FR 53149 - North American Waterfowl Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...

  12. 41 CFR 102-192.80 - How do we develop written security policies and plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...) Operating procedures; (d) Plan to provide a visible mail screening operation; (e) Training mail center...) Managing threats; (h) Communications plan; (i) Occupant Emergency Plan (OEP); (j) Continuity of Operations...

  13. Strategic Planning and Financial Management

    ERIC Educational Resources Information Center

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  14. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  15. 40 CFR 60.2060 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...

  16. 40 CFR 60.2060 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...

  17. 40 CFR 60.2060 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management plan? 60.2060 Section 60.2060 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Management Plan § 60.2060 When must I submit my waste management plan? You must submit a waste management...

  18. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  19. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  20. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  1. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing...

  2. 40 CFR 60.2625 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2625 When must I submit my waste management plan? You must submit a waste management plan no...

  3. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  4. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  5. 40 CFR 60.2900 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2900 When must I submit my waste management plan? You must submit a waste management plan prior to commencing...

  6. 40 CFR 62.14585 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must I submit my waste management... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14585 When must I submit my waste management plan? You must submit a waste management plan no later than April 5, 2004. ...

  7. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  8. 78 FR 70012 - Lake Tahoe Basin Management Unit, California, Land Management Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... DEPARTMENT OF AGRICULTURE Forest Service Lake Tahoe Basin Management Unit, California, Land Management Plan Revision AGENCY: Lake Tahoe Basin Management Unit, Forest Service, USDA. ACTION: Notice of... for the Lake Tahoe Basin Management Unit (LTBMU) Land Management Plan Revision available for the 60...

  9. 46 CFR 170.085 - Information required before a stability test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Information required before a stability test. 170.085... STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Plan Approval § 170.085 Information required... the information prescribed in § 170.185(g) must be submitted to the Coast Guard Marine Safety Center...

  10. Nurse manager succession planning: synthesis of the evidence.

    PubMed

    Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria

    2013-10-01

    The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.

  11. Coordinated traffic incident management using the I-Net embedded sensor architecture

    NASA Astrophysics Data System (ADS)

    Dudziak, Martin J.

    1999-01-01

    The I-Net intelligent embedded sensor architecture enables the reconfigurable construction of wide-area remote sensing and data collection networks employing diverse processing and data acquisition modules communicating over thin- server/thin-client protocols. Adaptive initially for operation using mobile remotely-piloted vehicle platforms such as small helicopter robots such as the Hornet and Ascend-I, the I-Net architecture lends itself to a critical problem in the management of both spontaneous and planned traffic congestion and rerouting over major interstate thoroughfares such as the I-95 Corridor. Pre-programmed flight plans and ad hoc operator-assisted navigation of the lightweight helicopter, using an auto-pilot and gyroscopic stabilization augmentation units, allows daytime or nighttime over-the-horizon flights of the unit to collect and transmit real-time video imagery that may be stored or transmitted to other locations. With on-board GPS and ground-based pattern recognition capabilities to augment the standard video collection process, this approach enables traffic management and emergency response teams to plan and assist real-time in the adjustment of traffic flows in high- density or congested areas or during dangerous road conditions such as during ice, snow, and hurricane storms. The I-Net architecture allows for integration of land-based and roadside sensors within a comprehensive automated traffic management system with communications to and form an airborne or other platform to devices in the network other than human-operated desktop computers, thereby allowing more rapid assimilation and response for critical data. Experiments have been conducted using several modified platforms and standard video and still photographic equipment. Current research and development is focused upon modification of the modular instrumentation units in order to accommodate faster loading and reloading of equipment onto the RPV, extension of the I-Net architecture to enable RPV-to-RPV signaling and control, and refinement of safety and emergency mechanisms to handle RPV mechanical failure during flight.

  12. Ecological planning of urbanized areas in the south of the Far East (Birobidzhan city as an example)

    NASA Astrophysics Data System (ADS)

    Kalmanova, V. B.

    2018-01-01

    Ecological planning of urbanized areas is an urgent demand of the time, because more than 70% of Russia’s population lives in cities. The article describes that the city’s ecological planning is an important part of the area’s organization in its development strategy. The principles and features of the urban area’s ecological organization are proposed. The basis for environmental planning is the ecological and functional zoning of urban areas. The algorithm of ecological-functional zoning is developed to optimize the quality of the urban environment. Based on it, it is possible to identify the planning structure’s features, justify anthropogenic pressure on the natural components of the urban environment, etc. The article briefly presents the possibility of using the main conditions of the ecological framework in the planning of urban areas. Considering the perspective trends of the formation and development of cities in the south of the Far East, the ecological problems caused by regional natural and anthropogenic causes (features of relief, climate, functional-planning structure) are considered. The need for environmental planning of cities in the south of the Far East is shown. The results of the ecological framework’s formation of Birobidzhan city based on its ecological and functional zoning are described. The total area of open unreformed spaces in the city is calculated to be 60.8%, which can serve as the main elements of the ecological framework and perspective reserve areas for ecological planning. The cartographic model of Birobidzhan’s ecological framework is presented, which is the result and model of this type of planning. The practical use of the proposed model will facilitate the adoption of effective management decisions aimed at stabilized development of the city.

  13. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  14. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  15. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  16. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  17. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  18. Backward assembly planning with DFA analysis

    NASA Technical Reports Server (NTRS)

    Lee, Sukhan (Inventor)

    1995-01-01

    An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.

  19. Design and realization of high quality prime farmland planning and management information system

    NASA Astrophysics Data System (ADS)

    Li, Manchun; Liu, Guohong; Liu, Yongxue; Jiang, Zhixin

    2007-06-01

    The article discusses the design and realization of a high quality prime farmland planning and management information system based on SDSS. Models in concept integration, management planning are used in High Quality Prime Farmland Planning in order to refine the current model system and the management information system is deigned with a triangular structure. Finally an example of Tonglu county high quality prime farmland planning and management information system is introduced.

  20. Passive and Active Stabilization of Liquid Bridges in Low Gravity

    NASA Technical Reports Server (NTRS)

    Marston, Philip L.; Thiessen, David B.; Marr-Lyon, Mark J.; Wei, Wei; Niederhaus, Charles E.; Truong, Duc K.

    2001-01-01

    Tests are planned in the low gravity environment of the International Space Station (ISS) of new methods for the suppression of the capillary instability of liquid bridges. Our suppression methods are unusual in that they are not limited to liquid bridges having very special properties and may impact a variety of low-gravity and earth-based technologies. There are two main approaches to be investigated: (1) Passive Acoustic Stabilization (PAS); and (2) Active Electrostatic Stabilization (AES). In PAS, the suppression of the mode growth is accomplished by placing the bridge in an acoustic field having the appropriate properties such that the acoustic radiation pressure automatically pulls outward on the thinnest portion of the bridge. In AES, the bridge deformation is sensed optically and counteracted by actively adjusting the electrostatic Maxwell stresses via two ring electrodes concentric with the slightly conducting bridge to offset the growth of the unstable mode. While the present work emphasizes cylindrical bridges, the methods need not be restricted to that case. The methods to be explored are relevant to the suppression of capillary instabilities in floating zone crystal growth, breakup of liquid jets and columns, bubbles, and annular films as well as the management of coolants or propellants in low-gravity.

  1. Backward assembly planning with DFA analysis

    NASA Technical Reports Server (NTRS)

    Lee, Sukhan (Inventor)

    1992-01-01

    An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.

  2. The need for coherence between waterfowl harvest and habitat management

    USGS Publications Warehouse

    Runge, M.C.; Johnson, F.A.; Anderson, M.G.; Koneff, M.D.; Reed, E.T.; Mott, S.E.

    2006-01-01

    Two of the most significant management efforts affecting waterfowl populations in North America are the North American Waterfowl Management Plan (the Plan) and Federal harvest management programs. Both the Plan and harvest management are continental in scope, involve an extensive group of stakeholders, and rely on adaptive processes of biological planning, implementation, and evaluation. The development of these programs has occurred independently, however, and there has been little explicit recognition that both harvest and habitat effects should be considered for coherent management planning and evaluation. For example, the harvest strategy can affect whether population objectives of the Plan are met, irrespective of the success of the Plan's habitat conservation efforts. Conversely, habitat conservation activities under the Plan can influence harvest potential and, therefore, the amount of hunting opportunity provided. It seems increasingly clear that the Plan's waterfowl population objectives can only be useful for conservation planning and evaluation if they are accompanied by an explicit specification of the harvest strategy and environmental conditions under which they are to be achieved. This clarification also is necessary to ensure that Plan population objectives are not attained solely through the reduction of hunting opportunity. We believe then that it is imperative that these key waterfowl-management programs work to harmonize their objectives. Harvest management programs and the Plan ought to be working toward the same ends, but that is not possible so long as the mutually reinforcing relationship of these programs is obscured by ambiguities in their management objectives.

  3. Planning documents: a business planning strategy.

    PubMed

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  4. 40 CFR 60.2625 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2625 When must I submit my waste management plan? You must submit a waste management plan no later than the date specified in table 1 of this...

  5. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  6. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  7. Solid Waste Management Plan. Revision 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  8. 77 FR 33237 - Saline Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National Park, Inyo... an Environmental Impact Statement for the Saline Valley Warm Springs Management Plan, Death Valley... analysis process for the Saline Valley Warm Springs Management Plan for Death Valley [[Page 33238...

  9. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  10. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  11. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  13. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  14. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  15. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  16. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  17. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school, including...

  18. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The Office of Financial Management, Planning and Evaluation is responsible for developing the Commission's...

  19. 78 FR 13376 - Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ...] Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park AGENCY... National Park Service (NPS) is preparing a Chronic Wasting Disease Management Plan and Environmental Impact Statement (CWD Management Plan/EIS) for Shenandoah National Park, Virginia. Action is needed at this time...

  20. 78 FR 55093 - Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ....YP0000] Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation... the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA Citizens...

  1. Turn over folders: a proven tool in succession management planning.

    PubMed

    Engells, Thomas E

    2011-01-01

    The dual challenges of succession management and succession management planning are considerable. A tool, the Turn over Folder, was introduced and described in detail as a useful first step in succession management planning. The adoption of that tool will not in itself produce a succession management plan, but it will orientate the organization and its members to the reality of succession management in all important leadership and critical positions. Succession management is an important consideration in all progressive organizations and well worth the effort.

  2. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...; (iv) Open space and recreation; (v) Energy use and conservation; (vi) Floodplain and wetlands...

  3. Suicide Management Plan--Post Suicide Response.

    ERIC Educational Resources Information Center

    Imhoff, Robert; Royster, Sharon

    This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…

  4. The U.S. climate change action plan: Challenges and prospects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darmstadter, J.

    1995-07-01

    In 1992, the United States and 154 other countries signed the United Nations Framework Convention on Climate Change, an international accord outlining measures for dealing with the threat of global warming. The following year, the Clinton administration released its Climate Change Action Plan for meeting the convention`s goal of stabilizing emissions of carbon dioxide and other greenhouse gases at 1990 levels by the year 2000. Evaluation of the plan`s prospects for success must necessarily be speculative at this point, but already several of the assumptions on which the plan is predicated appear questionable. Moreover, even if the emissions stabilization goalmore » is met, the problem of global warming will persist. Therefore, the greatest contribution of the plan might be to raise consciousness about the need for sustained measures to address climate change and its attendant socioeconomic consequences.« less

  5. A new approach for assessing the future of aquifers supporting irrigated agriculture

    NASA Astrophysics Data System (ADS)

    Butler, James J.; Whittemore, Donald O.; Wilson, Blake B.; Bohling, Geoffrey C.

    2016-03-01

    Aquifers supporting irrigated agriculture are under stress worldwide as a result of large pumping-induced water deficits. To aid in the formulation of more sustainable management plans for such systems, we have developed a water balance approach for assessing the impact of proposed management actions and the prospects for aquifer sustainability. Application to the High Plains aquifer (HPA) in the state of Kansas in the United States reveals that practically achievable reductions in annual pumping (<22%) would have stabilized areally averaged water levels over much of the Kansas HPA from 1996 to 2013. This demonstrates that modest pumping reductions can have a significant impact and highlights the importance of reliable pumping data for determining the net inflow (capture) component of the water balance. The HPA is similar to many aquifers supporting critically needed agricultural production, so the presented approach should prove of value far beyond the area of this initial application.

  6. Surgical management of gastric torsion.

    PubMed

    Parks, J

    1979-05-01

    Considerable investigation has been devoted to the gastric dilatation-torsion complex. An adequate explanation of its cause has yet to be made, or a means of prevention described. We do know of its highly lethal nature, especially if not aggressively treated, of the high incidence of recurrence, and of the associated pathophysiology. As surgeons, we must approach the patient in an aggressive systematic manner. Decompression and patient stabilization must be achieved prior to definitive surgical management. The surgery planned must correct the obvious pathologic state and include procedures designed to prevent recurrence of this condition. The tube gastrostomy technique promotes gastric fixation by dense adhesion bands exceeding that attainable by gastropexy alone. The procedure is easy to perform, requires little surgical time, and does not appear to be discomforting to the patient. In addition, the tube gastrostomy acts as a convenient decompressive pathway during the postoperative period, circumventing gastric intubation or pharyngostomy tube placement should distention occur.

  7. Space station human productivity study. Volume 5: Management plans

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

  8. Rhode Island congestion management plan : executive summary

    DOT National Transportation Integrated Search

    1997-09-01

    This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...

  9. 76 FR 56220 - Draft Environmental Impact Statement for General Management Plan for Golden Gate National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... Environmental Impact Statement for General Management Plan for Golden Gate National Recreation Area and Muir... Management Plan for Golden Gate National Recreation Area and Muir Woods National Monument. SUMMARY: In accord... Environmental Impact Statement (Draft EIS) for the updating the General Management Plan (GMP) for Golden Gate...

  10. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What is a waste management plan? 62.14580 Section 62.14580 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A...

  11. 25 CFR 700.721 - Range management plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Range management plans. 700.721 Section 700.721 Indians... Lands Grazing § 700.721 Range management plans. The Commissioner (or his designee) and the permittees of each range unit will meet as a group and develop a Range Management Plan for the common use of the...

  12. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  13. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  14. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  15. 40 CFR 62.14715 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...

  16. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  17. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  18. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  19. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  20. 49 CFR 236.18 - Software management control plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...

  1. 40 CFR 62.14715 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...

  2. 40 CFR 62.14715 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...

  3. 40 CFR 62.14715 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...

  4. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  5. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  6. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  7. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  8. 40 CFR 62.14715 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... 40 Protection of Environment 8 2011-07-01 2011-07-01 false When must I submit my waste management... submit my waste management plan? You must submit the waste management plan no later than April 5, 2004. ...

  9. 76 FR 35009 - Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... DEPARTMENT OF THE INTERIOR National Park Service [5130-0400-NZM] Draft Oil and Gas Management Plan... Management Plan/ Environmental Impact Statement for Big South Fork National River and Recreation Area and... gas management plan/environmental impact statement (OGMP/DEIS) for the proposed Big South Fork...

  10. 75 FR 77655 - Notice of Proposed Supplementary Rules for Public Lands in Colorado: Saguache, Alamosa, Rio...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... included in the San Luis Resource Area Travel Management Plan (TMP), approved on June 4, 2009. These... Luis Resource Area Travel Management Plan'' in the subject line). FOR FURTHER INFORMATION CONTACT... Resource Valley Travel Management Plan and Amend San Luis Valley Resource Management Plan and Start the...

  11. 40 CFR 60.3012 - What should I include in my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management plan? 60.3012 Section 60.3012 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A...

  12. Individual Predictors of Adolescents' Vocational Interest Stabilities

    ERIC Educational Resources Information Center

    Hirschi, Andreas

    2010-01-01

    The study investigated the predictive utility of interest profile differentiation, coherence, elevation, congruence, and vocational identity commitment and career maturity (career planning and exploration) on the 10-month interest stability of 292 Swiss eighth-grade students: profile, rank, and level stabilities were assessed. Controlling for…

  13. [Definition and stabilization of processes I. Management processes and support in a Urology Department].

    PubMed

    Pascual, Carlos; Luján, Marcos; Mora, José Ramón; Chiva, Vicente; Gamarra, Manuela

    2015-01-01

    The implantation of total quality management models in clinical departments can better adapt to the 2009 ISO 9004 model. An essential part of implantation of these models is the establishment of processes and their stabilization. There are four types of processes: key, management, support and operative (clinical). Management processes have four parts: process stabilization form, process procedures form, medical activities cost estimation form and, process flow chart. In this paper we will detail the creation of an essential process in a surgical department, such as the process of management of the surgery waiting list.

  14. Nonlinear differential system applied of a mechanical plan model of the automotives used for the nonlinear stability analysis

    NASA Astrophysics Data System (ADS)

    Simniceanu, Loreta; Mihaela, Bogdan; Otat, Victor; Trotea, Mario

    2017-10-01

    This paper proposes a plan mechanical model for the vehicles with two axles, taking into account the lateral deflection of the tire. For this mechanical model are determined two mathematical models under the nonlinear differential equations systems form without taking into account the action of the driver and taking into account. The analysis of driver-vehicle system consists in the mathematical description of vehicle dynamics, coupled with the possibilities and limits of the human factor. Description seeks to emphasize the significant influence of the driver in handling and stability analyzes of vehicles and vehicle-driver system stability until the advent of skidding. These mathematical models are seen as very useful tools to analyzing the vehicles stability. The paper analyzes the influence of some parameters of the vehicle on its behavior in terms of stability of dynamic systems.

  15. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  16. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...

  17. 43 CFR 1610.4-2 - Development of planning criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Development of planning criteria. 1610.4-2... Management Planning § 1610.4-2 Development of planning criteria. (a) The Field Manager will prepare criteria to guide development of the resource management plan or revision, to ensure: (1) It is tailored to...

  18. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  19. 78 FR 20260 - Fisheries of the Northeastern United States; Northeast Multispecies Fishery Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... subsequent fishing years. * * * * * (c) * * * (1) Adjustment process. (i) After a management action has been... Management Plan; Amendment 19 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and... 19 to the Northeast Multispecies Fishery Management Plan. The New England Fishery Management Council...

  20. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates... Management Plan, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas... management alternatives for Lake Meredith National Recreation Area and three management alternatives for...

  1. 78 FR 43226 - Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ...] Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National Park... Statement for the Going-to-the-Sun Road Corridor Management Plan for Glacier National Park, Montana. This effort will result in an integrated visitor and transportation management plan for the Going-to-the Sun...

  2. 10 CFR 719.12 - What information must be included in the Legal Management Plan?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false What information must be included in the Legal Management Plan? 719.12 Section 719.12 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan, Staffing and Resource Plan and Annual Legal Budget § 719.12 What information must be...

  3. Solid waste information and tracking system server conversion project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  4. We must tackle population problems.

    PubMed

    Hironaka, W

    1992-03-01

    Thank you Mr. Chairman, for the opportunity to speak out not only as a Japanese parliamentarian, but also as a member of GLOBE International, Global Legislators Organization for a Balanced Environment, consisting of legislators from the US Congress, EC Parliament, USSR Assembly and Japanese Diet who have joined together to compare, improve and coordinate our respective legislative activities in an effort to effectively address the complex issues surrounding environment and development. Mr. Chairman, world population--which reached 5.4 billion in mid-1991--is growing exponentially. According to 1 UNFPA report 3 people are born every second, a total of 250,000 people every day or 95-100 million people every year. At this rate, world population will reach 6.4 billion by year 2001, and if this rate continues to go unchecked, world population will reach 14-15 billion by the end of the 21st century. GLOBE is highly aware of the relationship between rapidly growing human populations, environmental degradation and sustainable development. We urge UNCED negotiators to address population growth rates and the integrally linked concerns of resource consumption levels, particularly in the industrialized world, in their search for solutions to the conflict between environment and development. Negotiators should also seriously consider ways in which to broaden educational and economic opportunities for women to ease population growth rates, and to alleviate poverty and stresses on the environment that result from population pressures. Social and economic factors must be integrated into population planning. It is saddening to note that almost 40,000 children die every day due to malnutrition, lack of fresh water and access to resources. Over 100 million children do not receive a primary education. Mr. Chairman, worldwide demand for a range of family planning services is increasing faster than supply. Recent studies indicate that if quality family planning information, training and services were made readily available by government and other groups, population rates would drop to manageable levels. Widespread access to family planning services is essential to population stabilization. The health of mothers, children and general quality of life is also improved through the implementation of family planning programs. At the present time many women cannot make use of the limited available services because of cultural constraints, lack of status and self-confidence. Unless complementary efforts are made to expand economic and educational opportunities for women, family planning and other reproductive health services will not reach their full potential for stabilizing population. Although family planning is an individual decision, and implementation of population programs is a sovereign matter in each country, I would urge developed countries to help their neighbors in developing countries who are in need of support for family planning and health services. Investment in family planning programs is 1 of the best ways to contribute to environmental protection and improvement. A greater portion of our foreign aid monies should be allocated for direct population assistance programs that will reach people at the grassroots level. To achieve this, a cooperative working relationship with local nongovernmental organization (NGOs) is essential. The members of GLOBE hope to facilitate cooperation between NGOs and governments so that we might stabilize human population. full text

  5. 36 CFR 219.3 - Overview.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to... responsible for national planning. National planning includes the Forest Service national strategic plan...

  6. 49 CFR 633.29 - PMP waivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.29 PMP waivers. A waiver will be... element is not necessary for a particular plan; or (b) The requirement of having a new project management... under a previously-approved project management plan. ...

  7. 49 CFR 633.29 - PMP waivers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.29 PMP waivers. A waiver will be... element is not necessary for a particular plan; or (b) The requirement of having a new project management... under a previously-approved project management plan. ...

  8. 49 CFR 633.29 - PMP waivers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.29 PMP waivers. A waiver will be... element is not necessary for a particular plan; or (b) The requirement of having a new project management... under a previously-approved project management plan. ...

  9. 49 CFR 633.29 - PMP waivers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.29 PMP waivers. A waiver will be... element is not necessary for a particular plan; or (b) The requirement of having a new project management... under a previously-approved project management plan. ...

  10. 49 CFR 633.29 - PMP waivers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.29 PMP waivers. A waiver will be... element is not necessary for a particular plan; or (b) The requirement of having a new project management... under a previously-approved project management plan. ...

  11. Health plans' disease management programs: extending across the medical and behavioral health spectrum?

    PubMed

    Merrick, Elizabeth Levy; Horgan, Constance M; Garnick, Deborah W; Hodgkin, Dominic; Morley, Melissa

    2008-01-01

    Although the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health and depression program characteristics are highly variable.

  12. Health Plans' Disease Management Programs: Extending across the Medical and Behavioral Health Spectrum?

    PubMed Central

    Merrick, Elizabeth Levy; Horgan, Constance M.; Garnick, Deborah W.; Hodgkin, Dominic; Morley, Melissa

    2015-01-01

    While the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes, but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health, and depression program characteristics are highly variable. PMID:18806594

  13. Management Information System Based on the Balanced Scorecard

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  14. 14 CFR 136.39 - Air tour management plans (ATMP).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Air tour management plans (ATMP). 136.39... TOURS AND NATIONAL PARKS AIR TOUR MANAGEMENT National Parks Air Tour Management § 136.39 Air tour management plans (ATMP). (a) Establishment. The Administrator, in cooperation with the Director, shall...

  15. 7 CFR 1415.12 - Modifications to easements and rental contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... modifications for restoration agreements and grazing management plans, or conservation plans where applicable... conservation plans, grazing management plans, and restoration plans, to facilitate the practical administration...

  16. Solid Variant of an Aneurysmal Bone Cyst of the Thoracic Spine.

    PubMed

    Mehta, Varshil; Padalkar, Pravin; Kale, Maya; Kathare, Ambadas

    2017-05-01

    The solid variant of an aneurysmal bone cyst (ABC) has been observed very rarely, especially those involving the spine. In this case report, we present a very unusual tumour of the thoracic spine which was managed by 360˚ decompression via posterior-only approach and stabilization. A 16-year-old boy presented to us with a sudden onset of weakness in both lower limbs leading to paraplegia. He also had a history of back and chest pain over the past one year. A collapse of the T5 vertebrae on plain radiograph was observed. The patient was immediately shifted to the operation theatre with an initial plan of a total en bloc spondylectomy of the T5. However, intraoperatively, histology favored a solid-ABC variant rather than a spindle cell tumour or giant cell tumour. Thus, the initial plan was revised to a 360˚ decompression without resecting the body en bloc via a posterolateral approach. After surgery, complete resolution of his sensory and motor dysfunction was achieved. His chest and back pain also resolved. The diseased vertebral body gradually healed and new bone formation was seen at 18 months postoperatively. This case report concludes that a solid variant of an ABC should be considered as a differential diagnosis for tumours involving the spine. An intraoperative frozen section procedure should be undertaken, especially during emergency situations. Early diagnosis and appropriate surgical management play an important role in the successful management of a solid variant of ABC.

  17. The EPA-Wide Plan to Provide Solid Waste Management Capacity Assistance to Tribes

    EPA Pesticide Factsheets

    This Plan is a strategy for building tribal capacity to manage solid waste. The Plan promotes the development and implementation of integrated waste management plans and describes how EPA will prioritize its resources to maximize environmental benefits.

  18. The NISTmAb Reference Material 8671 lifecycle management and quality plan.

    PubMed

    Schiel, John E; Turner, Abigail

    2018-03-01

    Comprehensive analysis of monoclonal antibody therapeutics involves an ever expanding cadre of technologies. Lifecycle-appropriate application of current and emerging techniques requires rigorous testing followed by discussion between industry and regulators in a pre-competitive space, an effort that may be facilitated by a widely available test metric. Biopharmaceutical quality materials, however, are often difficult to access and/or are protected by intellectual property rights. The NISTmAb, humanized IgG1κ Reference Material 8671 (RM 8671), has been established with the intent of filling that void. The NISTmAb embodies the quality and characteristics of a typical biopharmaceutical product, is widely available to the biopharmaceutical community, and is an open innovation tool for development and dissemination of results. The NISTmAb lifecyle management plan described herein provides a hierarchical strategy for maintenance of quality over time through rigorous method qualification detailed in additional submissions in the current publication series. The NISTmAb RM 8671 is a representative monoclonal antibody material and provides a means to continually evaluate current best practices, promote innovative approaches, and inform regulatory paradigms as technology advances. Graphical abstract The NISTmAb Reference Material (RM) 8671 is intended to be an industry standard monoclonal antibody for pre-competitive harmonization of best practices and designing next generation characterization technologies for identity, quality, and stability testing.

  19. Combating desertification in Iran over the last 50 years: an overview of changing approaches.

    PubMed

    Amiraslani, Farshad; Dragovich, Deirdre

    2011-01-01

    Desertification in Iran was recognized between the 1930s and 1960s. This paper traces Iran's attempts to reclaim desertified areas, evaluates the anti-desertification approaches adopted, and identifies continuing challenges. Iran has areas vulnerable to desertification due to extensive areas of drylands and increasing population pressure on land and water resources. Over-grazing of rangelands is a particular problem. Initially desertification was combated mainly at the local level and involved dune stabilization measures, especially the use of oil mulch, re-vegetation and windbreaks. Insufficient technical planning in the early years has led to changed approaches to plant densities and species diversity in plantations, and increased on-going management of existing plantations. Since the late 1980s forage and crop production has increased in areas where runoff control techniques are practiced. The social and economic aspects of anti-desertification programs have assisted in poverty reduction by providing off-season employment in rural areas. In 2004 a national plan to combat desertification was ratified and this placed an emphasis on community participation. Continuing challenges include managing existing desertified areas as well as taking into account potential future problems associated with rapidly depleting groundwater supplies and a predicted reduction in the plant growth period accompanying climate change. Copyright © 2010 Elsevier Ltd. All rights reserved.

  20. [Study on incorporation of "management and guidance of home-visiting by a pharmacist" into a care plan -observation based on a survey of care managers-].

    PubMed

    Nanaumi, Yoko; Onda, Mitsuko; Sakurai, Hidehiko; Tanaka, Rie; Tsubota, Kenichi; Matoba, Shunya; Mukai, Yusuke; Arakawa, Yukio; Hayase, Yukitoshi

    2010-11-01

    A survey of care managers ("CMs") was conducted to identify top priority issues in promoting the management and guidance of home-visiting by a pharmacist ("management and guidance") by focusing on the experience in incorporating the management and guidance into a care plan and its relevant factors. Major survey items included (1) number of years working as a CM, (2) basic occupation, (3) experience in incorporating the management and guidance into care plans, (4) understanding the management and guidance content, and (5) an awareness of the need for pharmacists' involvement in care plans. A χ² test was conducted to determine if the experience in incorporating the management and guidance into care plans caused a difference in the distribution of the number of years as a CM, the basic occupation, understanding of the management and guidance content, and an awareness of the need for pharmacists' involvement in care plans. A regression analysis was conducted to determine the degree of association between the incorporation experience and each item. The numbers of years working as a CM, the basic occupation, understanding of the management and guidance content, and an awareness of the need for pharmacists' involvement in care plans, were found to be associated with the experience in incorporating the management and guidance into care plans. Understanding of the management and guidance content was most closely associated. To promote pharmacists' management and guidance for home-based care, CMs need to deepen their understanding of this service.

  1. Patient Protection and Affordable Care Act; Market Stabilization. Final rule.

    PubMed

    2017-04-18

    This rule finalizes changes that will help stabilize the individual and small group markets and affirm the traditional role of State regulators. This final rule amends standards relating to special enrollment periods, guaranteed availability, and the timing of the annual open enrollment period in the individual market for the 2018 plan year; standards related to network adequacy and essential community providers for qualified health plans; and the rules around actuarial value requirements.

  2. Quantitative Evaluation Method of Each Generation Margin for Power System Planning

    NASA Astrophysics Data System (ADS)

    Su, Su; Tanaka, Kazuyuki

    As the power system deregulation advances, the competition among the power companies becomes heated, and they seek more efficient system planning using existing facilities. Therefore, an efficient system planning method has been expected. This paper proposes a quantitative evaluation method for the (N-1) generation margin considering the overload and the voltage stability restriction. Concerning the generation margin related with the overload, a fast solution method without the recalculation of the (N-1) Y-matrix is proposed. Referred to the voltage stability, this paper proposes an efficient method to search the stability limit. The IEEE30 model system which is composed of 6 generators and 14 load nodes is employed to validate the proposed method. According to the results, the proposed method can reduce the computational cost for the generation margin related with the overload under the (N-1) condition, and specify the value quantitatively.

  3. 15 CFR 921.33 - Boundary changes, amendments to the management plan, and addition of multiple-site components.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management plan, and addition of multiple-site components. 921.33 Section 921.33 Commerce and Foreign Trade... management plan, and addition of multiple-site components. (a) Changes in the boundary of a Reserve and major... management plan shall address goals and objectives for all components of the multi-site Reserve and the...

  4. Do Groundwater Management Plans Work? A statistical evaluation of the effectiveness of groundwater management plans towards achieving water supply and environmental objectives under a changing climate.

    NASA Astrophysics Data System (ADS)

    White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.

    2017-12-01

    Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed heads from the previous management period and adjusted depending upon triggers outlined in the management plan. The effectiveness of water restrictions as a management technique for the purpose of maintaining supply reliability under various decision making frequencies, aquifer response times and climate scenarios was explored.

  5. A Management Plan for Historic Bridges in Virginia: Update / Scoping Phase.

    DOT National Transportation Integrated Search

    2014-04-01

    "The Management Plan for Historic Bridges in Virginia, completed in 2001 (hereinafter the 2001 Management Plan), : identified the management and treatment needs for 54 bridges in Virginia that were individually eligible for or listed on the National ...

  6. Natural Resource Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, T.; Schwager, K.

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Naturalmore » Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.« less

  7. Nurse manager succession planning: A cost-benefit analysis.

    PubMed

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  8. 75 FR 20783 - Approval and Promulgation of Implementation Plans: Tennessee; Visibility Impairment Prevention...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ...-2010-0150,'' Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management... Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency... at the Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management...

  9. 44 CFR 206.437 - State administrative plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... administrative plan should become a part of the State's overall emergency response or operations plan as a... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true State administrative plan. 206.437 Section 206.437 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...

  10. 44 CFR 9.15 - Planning programs affecting land use.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Planning programs affecting..., DEPARTMENT OF HOMELAND SECURITY GENERAL FLOODPLAIN MANAGEMENT AND PROTECTION OF WETLANDS § 9.15 Planning... flood hazards and floodplain management and wetlands protection; and (b) Prescribes planning procedures...

  11. The individualized service plan as a clinical integration tool: qualitative analysis in the Quebec PRISMA experiment

    PubMed Central

    Somme, Dominique; Hébert, Réjean; Bravo, Gina; Blanchard, François; Saint-Jean, Olivier

    2007-01-01

    Introduction One aspect of clinical integration involves case managers' tools and particularly the individualized service plan. Methods We examined individualized service plan content and use in the PRISMA experiment. We analyzed 50 charts, and conducted and recorded interviews regarding individualized service plan use with all the case managers concerned (n=13). Results Delays between starting case management and writing the individualized service plan were long and varied (0–596 days, mean: 117 days). During the interviews, the individualized service plan was described as the ‘last step’ once the active planning phase was over. The reasons for formulating plans were mainly administrative. From a clinical viewpoint, individualized service plans were used as memoranda and not to describe services (842 interventions not mentioned in the plans) or needs (694 active problems not mentioned). Case managers felt uncomfortable with the individualized planning task and expected a tool more adapted to their needs. Conclusion Although a majority of the case managers' charts contained an individualized service plan, implementation of this tool seems tenuous. Because of the discrepancy between the potential usefulness expected by case managers and their actual use, a working committee was created to develop proposals for modifying the instrument. PMID:19503736

  12. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    PubMed

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  13. 10 CFR 719.10 - What information must be included in the legal management plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... be ensured; and, (6) The contractor's corporate approach to legal decision making. ... 10 Energy 4 2011-01-01 2011-01-01 false What information must be included in the legal management... Management Plan § 719.10 What information must be included in the legal management plan? The legal management...

  14. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  15. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  16. Results from a national survey on chronic care management by health plans.

    PubMed

    Mattke, Soeren; Higgins, Aparna; Brook, Robert

    2015-05-01

    The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.

  17. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  18. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  19. Stability, structure and scale: improvements in multi-modal vessel extraction for SEEG trajectory planning.

    PubMed

    Zuluaga, Maria A; Rodionov, Roman; Nowell, Mark; Achhala, Sufyan; Zombori, Gergely; Mendelson, Alex F; Cardoso, M Jorge; Miserocchi, Anna; McEvoy, Andrew W; Duncan, John S; Ourselin, Sébastien

    2015-08-01

    Brain vessels are among the most critical landmarks that need to be assessed for mitigating surgical risks in stereo-electroencephalography (SEEG) implantation. Intracranial haemorrhage is the most common complication associated with implantation, carrying significantly associated morbidity. SEEG planning is done pre-operatively to identify avascular trajectories for the electrodes. In current practice, neurosurgeons have no assistance in the planning of electrode trajectories. There is great interest in developing computer-assisted planning systems that can optimise the safety profile of electrode trajectories, maximising the distance to critical structures. This paper presents a method that integrates the concepts of scale, neighbourhood structure and feature stability with the aim of improving robustness and accuracy of vessel extraction within a SEEG planning system. The developed method accounts for scale and vicinity of a voxel by formulating the problem within a multi-scale tensor voting framework. Feature stability is achieved through a similarity measure that evaluates the multi-modal consistency in vesselness responses. The proposed measurement allows the combination of multiple images modalities into a single image that is used within the planning system to visualise critical vessels. Twelve paired data sets from two image modalities available within the planning system were used for evaluation. The mean Dice similarity coefficient was 0.89 ± 0.04, representing a statistically significantly improvement when compared to a semi-automated single human rater, single-modality segmentation protocol used in clinical practice (0.80 ± 0.03). Multi-modal vessel extraction is superior to semi-automated single-modality segmentation, indicating the possibility of safer SEEG planning, with reduced patient morbidity.

  20. Methane Hydrate Field Program. Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collett, Tim; Bahk, Jang-Jun; Frye, Matt

    2013-12-31

    This topical report represents a pathway toward better understanding of the impact of marine methane hydrates on safety and seafloor stability and future collection of data that can be used by scientists, engineers, managers and planners to study climate change and to assess the feasibility of marine methane hydrate as a potential future energy resource. Our understanding of the occurrence, distribution and characteristics of marine methane hydrates is incomplete; therefore, research must continue to expand if methane hydrates are to be used as a future energy source. Exploring basins with methane hydrates has been occurring for over 30 years, butmore » these efforts have been episodic in nature. To further our understanding, these efforts must be more regular and employ new techniques to capture more data. This plan identifies incomplete areas of methane hydrate research and offers solutions by systematically reviewing known methane hydrate “Science Challenges” and linking them with “Technical Challenges” and potential field program locations.« less

  1. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  2. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  3. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... that the plan is integrated to the extent practicable with other State and/or regional planning...

  4. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  5. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  6. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  7. Natural Resource Management Plan for Brookhaven National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    green, T.

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by themore » Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).« less

  8. Learning to manage a complex ecosystem: adaptive management and the Northwest Forest Plan.

    Treesearch

    George H. Stankey; Roger N. Clark; Bernard T. Bormann

    2006-01-01

    The Northwest Forest Plan (the Plan) identifies adaptive management as a central strategy for effective implementation. Despite this, there has been a lack of any systematic evaluation of its performance. This study is based on an extensive literature review, 50 interviews with resource managers and scientists involved with the Plan’s implementation, and a survey of...

  9. Configuration Management Plan for K Basins

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weir, W.R.; Laney, T.

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less

  10. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendments. SUMMARY: The Department of Agriculture (USDA) published a National Forest System land management planning rule in the... document may be sent to the Director, Ecosystem Management Coordination Staff, USDA Forest Service, 1400...

  11. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning guidance. 1610.1 Section 1610.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING...

  12. Improving collaboration and consensus building in the coordination of access management and land use in corridor planning.

    DOT National Transportation Integrated Search

    2015-06-01

    The success of access management depends on the coordination of access management planning and land use planning, : but the Virginia Department of Transportation (VDOT) has control over access management in Virginia and cities and counties : adjacent...

  13. 76 FR 38685 - Draft General Management Plan Amendment/Environmental Impact Statement, Tumacacori National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... experience at Tumacacori by developing access to these associated mission resources. A general management... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan Amendment... Management Plan, Tumacacori National Historical Park, in favor of an Environmental Assessment. SUMMARY: The...

  14. Management Development: The State of the Art as Perceived by HRD Professionals.

    ERIC Educational Resources Information Center

    Rothwell, William J.; Kazanas, H. C.

    1994-01-01

    Reviews the literature on management development and summarizes results of a survey of human resources development (HRD) professionals' perceptions about management development practices. Topics discussed include identifying management development needs; strategic business plans, succession plans, and individual development plans; frequency and…

  15. Tribal Decisions-Makers Guide to Solid Waste Management: Chapter 2 - Developing Solid Waste Management Plans

    EPA Pesticide Factsheets

    Solid waste management plans offer a host of benefits for tribes and Alaskan Native villages. Through the preparation of these plans, you can assess your cur-rent and future waste management needs, set priorities, and allocate resources accordingly.

  16. Energy Management of Manned Boost-Glide Vehicles: A Historical Perspective

    NASA Technical Reports Server (NTRS)

    Day, Richard E.

    2004-01-01

    As flight progressed from propellers to jets to rockets, the propulsive energy grew exponentially. With the development of rocket-only boosted vehicles, energy management of these boost-gliders became a distinct requirement for the unpowered return to base, alternate landing site, or water-parachute landing, starting with the X-series rocket aircraft and terminating with the present-day Shuttle. The problem presented here consists of: speed (kinetic energy) - altitude (potential energy) - steep glide angles created by low lift-to-drag ratios (L/D) - distance to landing site - and the bothersome effects of the atmospheric characteristics varying with altitude. The primary discussion regards post-boost, stabilized glides; however, the effects of centrifugal and geopotential acceleration are discussed as well. The aircraft and spacecraft discussed here are the X-1, X-2, X-15, and the Shuttle; and to a lesser, comparative extent, Mercury, Gemini, Apollo, and lifting bodies. The footprints, landfalls, and methods developed for energy management are also described. The essential tools required for energy management - simulator planning, instrumentation, radar, telemetry, extended land or water range, Mission Control Center (with specialist controllers), and emergency alternate landing sites - were first established through development of early concepts and were then validated by research flight tests.

  17. Chronic sacroiliac joint and pelvic girdle dysfunction in a 35-year-old nulliparous woman successfully managed with multimodal and multidisciplinary approach.

    PubMed

    Jonely, Holly; Brismée, Jean-Michel; Desai, Mehul J; Reoli, Rachel

    2015-02-01

    Sacroiliac joint pain and dysfunction affect 15-25% of patients reporting low back pain, including reports of spontaneous, idiopathic, traumatic, and non-traumatic onsets. The poor reliability and validity associated with diagnostic clinical and imaging techniques leads to challenges in diagnosing and managing sacroiliac joint dysfunction. A 35-year-old nulliparous female with a 14-year history of right sacroiliac joint dysfunction was managed using a multimodal and multidisciplinary approach when symptoms failed to resolve after 2 months of physical therapy. The plan of care included four prolotherapy injections, sacroiliac joint manipulation into nutation, pelvic girdle belting, and specific stabilization exercises. The patient completed 20 physical therapy sessions over a 12-month period. At 6 months, the patient's Oswestry Disability Questionnaire score was reduced from 34% to 14%. At 1-year follow-up, her score was 0%. The patient's rating of pain on a numeric rating scale decreased to an average of 4/10 at 6 months and 0/10 at 1-year follow-up. A multidisciplinary and multimodal approach for the management of chronic sacroiliac joint dysfunction appeared successful in a single-case design at 1-year follow-up.

  18. Region 7 Quality Management Plan

    EPA Pesticide Factsheets

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  19. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  20. 77 FR 35652 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-14

    ... Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency..., Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S... Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental...

  1. 76 FR 38672 - Redelegation of Authority to the Office of Strategic Planning and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... the Office of Strategic Planning and Management AGENCY: Office of the Chief Operating Officer, HUD... HUD (COO) redelegates to the Director, Office of Strategic Planning and Management, authority and... 22, 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and...

  2. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste management plan shall identify both the feasibility and the approach to separate certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from...

  3. 40 CFR 60.55c - Waste management plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste management plan shall identify both the feasibility and the approach to separate certain components of solid waste from the health care waste stream in order to reduce the amount of toxic emissions from...

  4. 76 FR 35467 - Deer and Vegetation Management Plan/Environmental Impact Statement, Fire Island National Seashore...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... Plan/Environmental Impact Statement, Fire Island National Seashore, New York AGENCY: National Park... for a Deer and Vegetation Management Plan, Fire Island National Seashore, New York. SUMMARY: Pursuant... preparing an Environmental Impact Statement (EIS) for a Deer and Vegetation Management Plan at Fire Island...

  5. 36 CFR 230.41 - Eligibility requirements for cost-share assistance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management plans such as Tree Farm management plans, Forest Stewardship management plans, or similar plans... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Eligibility requirements for cost-share assistance. 230.41 Section 230.41 Parks, Forests, and Public Property FOREST SERVICE...

  6. 36 CFR 230.41 - Eligibility requirements for cost-share assistance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management plans such as Tree Farm management plans, Forest Stewardship management plans, or similar plans... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Eligibility requirements for cost-share assistance. 230.41 Section 230.41 Parks, Forests, and Public Property FOREST SERVICE...

  7. 36 CFR 230.41 - Eligibility requirements for cost-share assistance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management plans such as Tree Farm management plans, Forest Stewardship management plans, or similar plans... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Eligibility requirements for cost-share assistance. 230.41 Section 230.41 Parks, Forests, and Public Property FOREST SERVICE...

  8. 36 CFR 230.41 - Eligibility requirements for cost-share assistance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management plans such as Tree Farm management plans, Forest Stewardship management plans, or similar plans... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Eligibility requirements for cost-share assistance. 230.41 Section 230.41 Parks, Forests, and Public Property FOREST SERVICE...

  9. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    DOT National Transportation Integrated Search

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  10. 78 FR 44981 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Plan Asset...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ... for OMB Review; Comment Request; Plan Asset Transactions Determined by In-House Asset Managers Under...) titled, ``Plan Asset Transactions Determined by In-House Asset Managers under Prohibited Transaction... Transaction Class Exemption for Plan Asset Transactions Determined by In-House Asset Managers (PTE 96-23...

  11. Energy Management Lesson Plans for Vocational Agriculture Instructors.

    ERIC Educational Resources Information Center

    Hedges, Lowell E., Ed.; Miller, Larry E., Ed.

    This notebook provides vocational agricultural teachers with 10 detailed lesson plans on the major topic of energy management in agriculture. The lesson plans present information about energy and the need to manage it wisely, using a problem-solving approach. Each lesson plan follows this format: lesson topic, lesson performance objectives,…

  12. DCASR (Defense Contract Administration Services Region) Boston, Strategic/Total Quality Management Master Plan Using Management by Planning (MBP)

    DTIC Science & Technology

    1989-06-01

    employees. A policy consists of targets, plans, and target values. Policy Deployment: One English translation for hoshin kanri . (Others are management by...policy and hoshin planning.) Policy deployment orchestrates continuous improvement in a way that fosters individual initiative and alignment. Process

  13. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Consistency with plans... plans, environmental standards, and other management requirements. The disposal of special forest products from National Forest System lands shall be consistent with applicable land management plans. Each...

  14. 36 CFR 223.30 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Consistency with plans... Provisions § 223.30 Consistency with plans, environmental standards, and other management requirements. The... Forest timber disposal is consistent with applicable land and resource management plans and environmental...

  15. Self-management behaviour and support among primary care COPD patients: cross-sectional analysis of data from the Birmingham Chronic Obstructive Pulmonary Disease Cohort.

    PubMed

    Khan, Ainee; Dickens, Andrew P; Adab, Peymane; Jordan, Rachel E

    2017-07-20

    Self-management support for chronic obstructive pulmonary disease (COPD) patients is recommended by UK national guidelines, but extent of implementation is unknown. We aimed to describe self-management behaviour and support among COPD patients and explore behaviour associated with having a self-management plan. We undertook cross-sectional analysis of self-reported data from diagnosed COPD patients in the Birmingham COPD Cohort study. Questionnaire items relevant to self-management behaviour, knowledge of COPD, receipt of self-management plans and advice from healthcare professionals were examined. Multiple regression models were used to identify behaviour associated with having a self-management plan. One-thousand seventy-eight participants (676 males, 62.7%, mean age 69.8 (standard deviation 9.0) years) were included. The majority reported taking medications as instructed (940, 94.0%) and receiving annual influenza vaccinations (962, 89.2%). Only 400 (40.4%) participants had self-management plans, 538 (49.9%) reported never having received advice on diet/exercise and 110 (42.7%) current smokers had been offered practical help to stop smoking in the previous year. General knowledge about COPD was moderate (mean total Bristol COPD Knowledge Questionnaire score: 31.5 (standard deviation 10.7); max score 65), corresponding to 48.5% of questions answered correctly. Having a self-management plan was positively associated with self-reported adherence to medication (odds ratio 3.10, 95% confidence interval 1.43 to 6.72), attendance at a training course (odds ratio 2.72, 95% confidence interval 1.81 to 4.12), attendance at a support group (odds ratio 6.28, 95% confidence interval 2.96 to 13.35) and better disease knowledge (mean difference 4.87, 95% confidence interval 3.16 to 6.58). Primary care healthcare professionals should ensure more widespread implementation of individualised self-management plans for all patients and improve the lifestyle advice provided. CALL FOR WIDER IMPLEMENTATION OF SELF-MANAGEMENT PLANS: Health professionals should ensure all patients with chronic lung disease receive individualized self-management plans and lifestyle advice. UK national guidelines state that patients with chronic obstructive pulmonary disease (COPD) should receive personalized self-management plans and comprehensive support to help them manage their disease. Ainee Khan and colleagues at the University of Birmingham analyzed patient questionnaire data gathered during the Birmingham COPD Cohort study to explore self-management behavior, receipt of self-management plans and advice, and patient knowledge of COPD. Of 1,078 participants, only 400 had self-management plans, and less than half reported receiving lifestyle advice or support. Those with plans were more likely to adhere to medication, had greater knowledge about COPD and were more likely to attend support groups and training courses. The authors recommend carefully-planned, wider implementation of COPD self-management plans and associated support.

  16. Irrigator responses to groundwater resource management in northern Victoria, southeastern Australia

    NASA Astrophysics Data System (ADS)

    Gill, Bruce C.; Webb, John; Wilkinson, Roger; Cherry, Don

    2014-10-01

    In northern Victoria, farmers are the biggest users of groundwater and therefore the main stakeholders in plans that seek to sustainably manage the resource. Interviews with 30 irrigation farmers in two study areas, analysed using qualitative social research methods, showed that the overwhelming majority of groundwater users agreed with the need for groundwater management and thought that the current plans had achieved sustainable resource use. The farmers also expressed a strong need for clear technical explanations for management decisions, in particular easily understood water level data. The social licence to implement the management plans arose through effective consultation with the community during plan development. Several additional factors combined to gain acceptance for the plans: good data on groundwater usage and aquifer levels is available; irrigation farmers had been exposed to usage restrictions since the late 1990s; an ‘adaptive’ management approach is in use which allowed refinements to be readily incorporated and fortuitously, plan development coincided with the 1998-2009 drought, when declines in groundwater levels reinforced the usefulness of the plans. The imposition of a nation-wide water use reduction plan in 2012 had relatively little impact in Victoria because of the early implementation of effective groundwater management plans. However, economic difficulties that reduce groundwater users’ capacity to pay groundwater management charges mean that the future of the plans in Victoria is not assured. Nevertheless, the high level of trust that exists between Victorian irrigation farmers and the management agencies suggests that the continued use of a consultative approach will continue to produce workable outcomes. Lessons from the Victorian experience may be difficult to apply in other areas of groundwater use in Australia and overseas, where there may be a quite different history of development and culture of groundwater management.

  17. Integrating socio-economic and biophysical data to enhance watershed management and planning

    NASA Astrophysics Data System (ADS)

    Pirani, Farshad Jalili; Mousavi, Seyed Alireza

    2016-09-01

    Sustainability has always been considered as one of the main aspects of watershed management plans. In many developing countries, watershed management practices and planning are usually performed by integrating biophysical layers, and other existing layers which cannot be identified as geographic layers are ignored. We introduce an approach to consider some socioeconomic parameters which are important for watershed management decisions. Ganj basin in Chaharmahal-Bakhtiari Province was selected as the case study area, which includes three traditional sanctums: Ganj, Shiremard and Gerdabe Olya. Socioeconomic data including net agricultural income, net ranching income, population and household number, literacy rate, unemployment rate, population growth rate and active population were mapped within traditional sanctums and then were integrated into other biophysical layers. After overlaying and processing these data to determine management units, different quantitative and qualitative approaches were adopted to achieve a practical framework for watershed management planning and relevant plans for homogeneous units were afterwards proposed. Comparing the results with current plans, the area of allocated lands to different proposed operations considering both qualitative and quantitative approaches were the same in many cases and there was a meaningful difference with current plans; e.g., 3820 ha of lands are currently managed under an enclosure plan, while qualitative and quantitative approaches in this study suggest 1388 and 1428 ha to be allocated to this operation type, respectively. Findings show that despite the ambiguities and complexities, different techniques could be adopted to incorporate socioeconomic conditions in watershed management plans. This introductory approach will help to enhance watershed management decisions with more attention to societal background and economic conditions, which will presumably motivate local communities to participate in watershed management plans.

  18. Measuring and Modeling Root Distribution and Root Reinforcement in Forested Slopes for Slope Stability Calculations

    NASA Astrophysics Data System (ADS)

    Cohen, D.; Giadrossich, F.; Schwarz, M.; Vergani, C.

    2016-12-01

    Roots provide mechanical anchorage and reinforcement of soils on slopes. Roots also modify soil hydrological properties (soil moisture content, pore-water pressure, preferential flow paths) via subsurface flow path associated with root architecture, root density, and root-size distribution. Interactions of root-soil mechanical and hydrological processes are an important control of shallow landslide initiation during rainfall events and slope stability. Knowledge of root-distribution and root strength are key components to estimate slope stability in vegetated slopes and for the management of protection forest in steep mountainous area. We present data that show the importance of measuring root strength directly in the field and present methods for these measurements. These data indicate that the tensile force mobilized in roots depends on root elongation (a function of soil displacement), root size, and on whether roots break in tension of slip out of the soil. Measurements indicate that large lateral roots that cross tension cracks at the scarp are important for slope stability calculations owing to their large tensional resistance. These roots are often overlooked and when included, their strength is overestimated because extrapolated from measurements on small roots. We present planned field experiments that will measure directly the force held by roots of different sizes during the triggering of a shallow landslide by rainfall. These field data are then used in a model of root reinforcement based on fiber-bundle concepts that span different spacial scales, from a single root to the stand scale, and different time scales, from timber harvest to root decay. This model computes the strength of root bundles in tension and in compression and their effect on soil strength. Up-scaled to the stand the model yields the distribution of root reinforcement as a function of tree density, distance from tree, tree species and age with the objective of providing quantitative estimates of tree root reinforcement for best management practice of protection forests.

  19. Cost accounting, management control, and planning in health care.

    PubMed

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)

  20. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  1. Medicaid beneficiaries in california reported less positive experiences when assigned to a managed care plan.

    PubMed

    McDonnell, Diana D; Graham, Carrie L

    2015-03-01

    In 2011 California began transitioning approximately 340,000 seniors and people with disabilities from Medicaid fee-for-service (FFS) to Medicaid managed care plans. When beneficiaries did not actively choose a managed care plan, the state assigned them to one using an algorithm based on their previous FFS primary and specialty care use. When no clear link could be established, beneficiaries were assigned by default to a managed care plan based on weighted randomization. In this article we report the results of a telephone survey of 1,521 seniors and people with disabilities enrolled in Medi-Cal (California Medicaid) and who were recently transitioned to a managed care plan. We found that 48 percent chose their own plan, 11 percent were assigned to a plan by algorithm, and 41 percent were assigned to a plan by default. People in the latter two categories reported being similarly less positive about their experiences compared to beneficiaries who actively chose a plan. Many states in addition to California are implementing mandatory transitions of Medicaid-only beneficiaries to managed care plans. Our results highlight the importance of encouraging beneficiaries to actively choose their health plan; when beneficiaries do not choose, states should employ robust intelligent assignment algorithms. Project HOPE—The People-to-People Health Foundation, Inc.

  2. A New Approach for Assessing Aquifer Sustainability and the Impact of Proposed Management Actions

    NASA Astrophysics Data System (ADS)

    Butler, J. J., Jr.; Whittemore, D. O.; Wilson, B. B.

    2015-12-01

    Aquifers are under stress worldwide as a result of large imbalances between inflows and outflows. These imbalances are particularly severe in aquifers in semi-arid regions that are heavily pumped for irrigation, such as the High Plains aquifer (HPA) in the United States. The water resources community has responded by placing an increasing emphasis on more sustainable management plans. To aid in the formulation of such plans, we have developed a simple, water-balance-based approach for rapid assessment of the impact of proposed management actions and the prospects for aquifer sustainability. This theoretically sound approach is particularly well suited for assessing the short- to medium-term (years to a few decades) response to management actions in seasonably pumped aquifers. The net inflow (capture) term of the aquifer water balance can also be directly calculated from water-level and water-use data with this approach. Application to the data-rich portion of the HPA in the state of Kansas reveals that practically achievable reductions in annual pumping would have a large impact. For example, a 22% reduction in average annual water use would have stabilized areally averaged water levels across northwest Kansas from 1996 to 2013 because of larger-than-expected and near-constant net inflows. Whether this is a short-term phenomenon or a path to long-term sustainability, however, has yet to be determined. Water resources managers are often in a quandary about the most effective use of scarce funds for data collection in support of aquifer assessment and management activities. This work demonstrates that a strong emphasis should be placed on collection of reliable water-use data; greater resources devoted to direct measurement of pumping will yield deeper insights into an aquifer's future. The Kansas HPA is similar to many other regional aquifers supporting critically needed agricultural production, so this approach should prove of value far beyond the borders of Kansas.

  3. 76 FR 11193 - Sequoia National Forest; California; Piute Mountains Travel Management Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... National Forest; California; Piute Mountains Travel Management Plan; Correction AGENCY: Forest Service... intent to prepare an environmental impact statement for the Piute Mountains Travel Management Plan. FOR...

  4. A ten-step process to develop case management plans.

    PubMed

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  5. 25 CFR 1200.16 - What criteria will be used in evaluating the management plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... performance record for funds management, and the ability to compensate the tribe if the entity is found liable for failing to comply with the tribe's management plan (i.e., its assets, bonding, and insurance). (b... complexity of the proposed management plan to determine whether the tribe has the experience to manage its...

  6. 25 CFR 1200.16 - What criteria will be used in evaluating the management plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... performance record for funds management, and the ability to compensate the tribe if the entity is found liable for failing to comply with the tribe's management plan (i.e., its assets, bonding, and insurance). (b... complexity of the proposed management plan to determine whether the tribe has the experience to manage its...

  7. 75 FR 10811 - Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... adaptive management principles; and 18. The Economic Profile System will be used as one source of... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNMP01000 L16100000 DO0000] Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource Management Plan for the...

  8. 36 CFR 219.7 - Plan decisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Forest System Land and Resource Management Planning The Framework for Planning § 219.7 Plan decisions... the Forest Service national strategic plan to specific national forests and grasslands. While plan... management actions necessary for the achievement of desired conditions and objectives and compliance with...

  9. 36 CFR 219.7 - Plan decisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Forest System Land and Resource Management Planning The Framework for Planning § 219.7 Plan decisions... the Forest Service national strategic plan to specific national forests and grasslands. While plan... management actions necessary for the achievement of desired conditions and objectives and compliance with...

  10. The importance of having an appropriate relational data segmentation in ATLAS

    NASA Astrophysics Data System (ADS)

    Dimitrov, G.

    2015-12-01

    In this paper we describe specific technical solutions put in place in various database applications of the ATLAS experiment at LHC where we make use of several partitioning techniques available in Oracle 11g. With the broadly used range partitioning and its option of automatic interval partitioning we add our own logic in PLSQL procedures and scheduler jobs to sustain data sliding windows in order to enforce various data retention policies. We also make use of the new Oracle 11g reference partitioning in the Nightly Build System to achieve uniform data segmentation. However the most challenging issue was to segment the data of the new ATLAS Distributed Data Management system (Rucio), which resulted in tens of thousands list type partitions and sub-partitions. Partition and sub-partition management, index strategy, statistics gathering and queries execution plan stability are important factors when choosing an appropriate physical model for the application data management. The so-far accumulated knowledge and analysis on the new Oracle 12c version features that could be beneficial will be shared with the audience.

  11. Talent Management: Emphasis on Action

    ERIC Educational Resources Information Center

    Butterfield, Barbara

    2008-01-01

    Recent discussions among HR practitioners in higher education have focused on talent management; specifically, the concept of developing a college or university talent management approach balanced between planning and action. Talent management as a planning tool looks very similar to workforce planning, but where HR will experience a real…

  12. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  13. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.105 What must be included in the laboratory environmental management plan? (a) Each University must include specific... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  14. Oak Ridge Reservation Waste Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  15. Improving our legacy: Incorporation of adaptive management into state wildlife action plans

    USGS Publications Warehouse

    Fontaine, J.J.

    2011-01-01

    The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ???25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. ?? 2010 .

  16. Improving our legacy: incorporation of adaptive management into state wildlife action plans.

    PubMed

    Fontaine, Joseph J

    2011-05-01

    The loss of biodiversity is a mounting concern, but despite numerous attempts there are few large scale conservation efforts that have proven successful in reversing current declines. Given the challenge of biodiversity conservation, there is a need to develop strategic conservation plans that address species declines even with the inherent uncertainty in managing multiple species in complex environments. In 2002, the State Wildlife Grant program was initiated to fulfill this need, and while not explicitly outlined by Congress follows the fundamental premise of adaptive management, 'Learning by doing'. When action is necessary, but basic biological information and an understanding of appropriate management strategies are lacking, adaptive management enables managers to be proactive in spite of uncertainty. However, regardless of the strengths of adaptive management, the development of an effective adaptive management framework is challenging. In a review of 53 State Wildlife Action Plans, I found a keen awareness by planners that adaptive management was an effective method for addressing biodiversity conservation, but the development and incorporation of explicit adaptive management approaches within each plan remained elusive. Only ~25% of the plans included a framework for how adaptive management would be implemented at the project level within their state. There was, however, considerable support across plans for further development and implementation of adaptive management. By furthering the incorporation of adaptive management principles in conservation plans and explicitly outlining the decision making process, states will be poised to meet the pending challenges to biodiversity conservation. Published by Elsevier Ltd.

  17. Modeling synchronous voltage source converters in transmission system planning studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kosterev, D.N.

    1997-04-01

    A Voltage Source Converter (VSC) can be beneficial to power utilities in many ways. To evaluate the VSC performance in potential applications, the device has to be represented appropriately in planning studies. This paper addresses VSC modeling for EMTP, powerflow, and transient stability studies. First, the VSC operating principles are overviewed, and the device model for EMTP studies is presented. The ratings of VSC components are discussed, and the device operating characteristics are derived based on these ratings. A powerflow model is presented and various control modes are proposed. A detailed stability model is developed, and its step-by-step initialization proceduremore » is described. A simplified stability model is also derived under stated assumptions. Finally, validation studies are performed to demonstrate performance of developed stability models and to compare it with EMTP simulations.« less

  18. Scientifically defensible fish conservation and recovery plans: Addressing diffuse threats and developing rigorous adaptive management plans

    USGS Publications Warehouse

    Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy

    2016-01-01

    We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.

  19. Assessing hospital emergency management plans: a guide for infection preventionists.

    PubMed

    Rebmann, Terri

    2009-11-01

    Hospital emergency management plans are essential and must include input from an infection preventionist (IP). Multiple hospital planning documents exist, but many do not address infection prevention issues, combine them with noninfection prevention issues, or are disease/event specific. An all-encompassing emergency management planning guide for IPs is needed. A literature review and Internet search were conducted in December 2008. Data from relevant sources were extracted. A spreadsheet was created that delineated hospital emergency management plan components of interest to IPs. Of the sources screened, 49 were deemed relevant. Eleven domains were identified: (1) having a plan; (2) assessing hospital readiness; (3) having infection prevention policies and procedures; (4) having occupational health policies and procedures; (5) conducting surveillance and triage; (6) reporting incidents, having a communication plan, and managing information; (7) having laboratory support; (8) addressing surge capacity issues; (9) having anti-infective therapy and/or vaccines; (10) providing infection prevention education; and (11) managing physical plant issues. Infection preventionists should use this article as an assessment tool for evaluating their hospital emergency management plan and for developing policies and procedures that will decrease the risk of infection transmission during a mass casualty event.

  20. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  1. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...

  2. 75 FR 63851 - Draft General Management Plan and Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... the Interior. ACTION: Notice of Availability of the Draft General Management Plan and Environmental... 63852

  3. Toxicity of stabilized and unstabilized pyrethrins applied to western spruce budworm

    Treesearch

    Robert L. Lyon; Jacqueline L. Robertson

    1971-01-01

    Stabilized pyrethrins were test in a laboratory spray chamber to provide information for planning field trials of this insecticide against the western spruce budworm (Choristoneura occidentalis Freeman). No significant differences were found in toxicity to instars 3 to 6. Stabilizers appear to have had no effect on basic contact toxicity. The...

  4. 75 FR 20541 - Homeless Emergency Assistance and Rapid Transition to Housing: Defining “Homeless”

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... Housing Stability Program. The HEARTH Act also codifies in statutory law the Continuum of Care planning... activities and to add rapid re-housing activities. The new Rural Housing Stability program replaces the Rural... Care program, and the Rural Housing Stability program. Each of these programs will include the...

  5. 43 CFR 1610.4-8 - Selection of resource management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Selection of resource management plan. 1610.4-8 Section 1610.4-8 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING...

  6. 43 CFR 1610.5 - Resource management plan approval, use and modification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management plan approval, use and modification. 1610.5 Section 1610.5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING...

  7. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  8. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  9. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  10. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District...

  11. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  12. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9...

  13. 78 FR 13316 - National Forest System Land Management Planning Directives

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... responsibilities. It should be used in conjunction with the FSH. FSH 1909.12--Land Management Planning Handbook... management planning. Forest Service Handbook 1909.15, section 31.12 (57 FR 43208; September 18, 1992... DEPARTMENT OF AGRICULTURE Forest Service RIN 0596-AD06 National Forest System Land Management...

  14. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Harpers Ferry National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... guidance to park management for administration, development, and interpretation of park resources over the... General Management Plan for Harpers Ferry National Historical Park. SUMMARY: Pursuant to the National... availability of a Final Environmental Impact Statement for the General Management Plan for Harpers Ferry [[Page...

  15. 75 FR 28055 - General Management Plan; Joshua Tree National Park; San Bernardino and Riverside Counties, CA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... DEPARTMENT OF THE INTERIOR National Park Service General Management Plan; Joshua Tree National... National Park Service is updating the General Management Plan (GMP) for Joshua Tree National Park... park management and resource analysis, other designations such as establishment of 594,502 acres by...

  16. 75 FR 77691 - Douglas and Nolichucky Tributary Reservoirs Land Management Plan, in Cocke, Greene, Hamblen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... reservoirs on public and private land include TVA project operations, developed and dispersed recreation... TENNESSEE VALLEY AUTHORITY Douglas and Nolichucky Tributary Reservoirs Land Management Plan, in... Reservoirs Land Management Plan for the 3,191 acres of TVA-managed public land on these reservoirs in...

  17. 76 FR 35408 - Essential Fish Habitat (EFH) Components of Fishery Management Plans (Northeast Multispecies...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... Fish Habitat (EFH) Components of Fishery Management Plans (Northeast Multispecies, Atlantic Sea Scallop...). SUMMARY: The New England Fishery Management Council (Council) is in the process of preparing a programmatic EIS for an Omnibus EFH Amendment to the fishery management plans (FMPs) for Northeast (NE...

  18. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  19. 78 FR 47410 - General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ...] General Management Plan, Draft Environmental Impact Statement, Gateway National Recreation Area, New... (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the General Management Plan (GMP... alternatives to guide the management of the site over the next 20 years. The NPS preferred alternative...

  20. 40 CFR 62.14590 - What should I include in my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries, or metals; or the... waste management measures already in place, the costs of additional measures, the emissions reductions...

  1. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; analysis of major policy and operational issues; performing evaluations and management studies of... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The...

  2. Soil quality is key for planning and managing urban allotments intended for the sustainable production of home-consumption vegetables.

    PubMed

    Bretzel, F; Calderisi, M; Scatena, M; Pini, R

    2016-09-01

    The growing importance of urban allotments in planning and managing urban areas is due to the combined positive effects on ecosystem services, the economy and human well-being, especially of groups of the urban population that can be vulnerable (e.g. the elderly, immigrants, low-income families). Some studies have highlighted the potential risk of contamination by metals of vegetables grown in urban areas and the lack of appropriate site-specific risk assessments. However, surveys are still lacking on the possibilities of using urban soil as a good substrate to produce vegetables for home consumption. We assessed the soil quality in two areas in Pisa (Italy), one intended for urban horticulture and the other already cultivated for that purpose. We analysed the soils for the main chemical and physical characteristics (texture, bulk density, water stability index, pH, cation exchange capacity, organic carbon, total nitrogen, phosphorous) and elements (Pb, Cu, Ni, Cr, Zn, Cd, As, K, Al and Mn). Our results showed that both areas had physical and chemical heterogeneity due to the effects of urbanization and to the different cultivation techniques employed. The metal content was lower than the guidelines limits, and the soil conditions (pH = 8) greatly reduced the metal mobility. Copper concentration in some of the cultivated area samples was higher than the limits, representing a possible stress factor for the microbial biodiversity and fauna. Our findings demonstrate that site-specific surveys are necessary before planning urban cultivation areas, and educating urban gardeners regarding sustainable cultivation techniques is a priority for a safe environment.

  3. Optimal Decision-making Model of Integrated Water Resources Management - A Case of Hsinchu Water Resources Management

    NASA Astrophysics Data System (ADS)

    Wang, S. Y.; Ho, C. C.; Chang, L. C.

    2017-12-01

    The public use water in Hsinchu are mainly supplied from Baoshan Reservoir, Second Baoshan Reservoir, Yongheshan Reservoir and Longen Weir. However, the increasing water demand, caused by development of the Hsinchu Science and Industrial Park, results in supply stable water getting more difficult. For stabilize water supply in Hsinchu, the study applies long-term and short-term plans to fulfill the water shortage. Developing an efficient methodology to define a cost-effective action portfolio is an important task. Hence, the study develops a novel decision model, the Stochastic Programming with Recourse Decision Model (SPRDM), to estimate a cost-effective action portfolio. The first-stage of SPRDM determine the long-term action portfolio and the portfolio accompany recourse information (the probability for water shortage event). The second-stage of SPRDM optimize the cost-effective action portfolio in response to the recourse information. In order to consider the uncertainty of reservoir sediment and demand growth, the study set 9 scenarios comprise optimistic, most likely, and pessimistic reservoir sediment and demand growth. The results show the optimal action portfolio consist of FengTain Lake and Panlon Weir, Hsinchu Desalination Plant, Domestic and Industrial Water long-term plans, and Emergency Backup Well, Irrigation Water Transference, Preliminary Water Rationing, Advanced Water Rationing and Water Transport from Other Districts short-term plans. The minimum expected cost of optimal action portfolio is NT$1.1002 billion. The results can be used as a reference for decision making because the results have considered the uncertainty of varied hydrology, reservoir sediment, and water demand growth.

  4. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    PubMed

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Using principles from emergency management to improve emergency response plans for research animals.

    PubMed

    Vogelweid, Catherine M

    2013-10-01

    Animal research regulatory agencies have issued updated requirements for emergency response planning by regulated research institutions. A thorough emergency response plan is an essential component of an institution's animal care and use program, but developing an effective plan can be a daunting task. The author provides basic information drawn from the field of emergency management about best practices for developing emergency response plans. Planners should use the basic principles of emergency management to develop a common-sense approach to managing emergencies in their facilities.

  6. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Decision for the General Management Plan/Abbreviated Final Environmental Impact Statement for New River... Abbreviated Final Environmental Impact Statement for the General Management Plan for New River Gorge National... Record of Decision can be downloaded from the NPS Planning, Environment and Public Comment (PEPC) Web...

  7. Joint Venture Health Plans May Give ACOs a Run for Their Money.

    PubMed

    Reinke, Thomas

    2016-12-01

    Joint venture plans are starting to demonstrate their ability to implement clinical management and financial management reforms. A JV health plan replaces the offloading of financial risk by health plans to ill-equipped providers with an executive-level cost management committee stated jointly by the hospital and payer.

  8. 38 CFR 21.96 - Review of the plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reaching the goals of the plan will be reviewed and evaluated as scheduled in the plan by the case manager and the veteran. (b) Comprehensive review required. The case manager and the veteran will review all... such review the veteran and the case manager will agree whether the plan should be: (1) Retained in its...

  9. Effect of strategic planning education on attitudes and perceptions of independent community pharmacy owners/managers.

    PubMed

    Harrison, Donald L

    2007-01-01

    To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.

  10. Disaster relief volunteerism: Evaluating cities' planning for the usage and management of spontaneous volunteers.

    PubMed

    Rivera, Jason David; Wood, Zachary David

    2016-01-01

    This exploratory study sought to observe the perceptions, usage, and planned management of spontaneous volunteers in disaster planning and response within various urban environments. The authors discuss the perceptions of spontaneous volunteerism in America, specifically the challenges of using spontaneous volunteers in disaster response activities. A content analysis of the 50 largest cities in the US Office of Emergency Management Web sites and a survey instrument administered to emergency managers in these 50 cities were used to explore various questions raised throughout the discussion of the literature. The authors found significant discrepancies between what is stated in the disaster plans of cities and what emergency managers claim is covered in their plans. Of the managers surveyed, only a handful mention spontaneous volunteers in their plans at all, and even fewer cities discuss them extensively. In addition, stated perceptions of the value of spontaneous volunteers may impact both how we plan for them and the value they provide.

  11. DESC (Defense Electronics Supply Center) Total Quality Management Plan

    DTIC Science & Technology

    1989-04-01

    Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM (Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement

  12. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  13. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations, ventilation, escapes... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  14. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of liferafts and buoyant apparatus. (h) Crew's accommodations. (1) Arrangement plans showing... Drains Penetrating Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The...) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter. (d) Fire...

  15. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... apparatus. (2) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  16. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of liferafts and buoyant apparatus. (h) Crew's accommodations. (1) Arrangement plans showing... Drains Penetrating Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The...) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter. (d) Fire...

  17. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... apparatus. (2) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  18. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... apparatus. (2) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  19. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of liferafts and buoyant apparatus. (h) Crew's accommodations. (1) Arrangement plans showing... Drains Penetrating Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The...) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter. (d) Fire...

  20. Evaluation of Effecting Parameters on Optimum Arrangement of Urban Land Uses and Assessment of Their Compatibility Using Adjacency Matrix

    NASA Astrophysics Data System (ADS)

    Vaezi, S.; Mesgari, M. S.; Kaviary, F.

    2015-12-01

    Todays, stability of human life is threatened by a set of parameters. So sustainable urban development theory is introduced after the stability theory to protect the urban environment. In recent years, sustainable urban development gains a lot of attraction by different sciences and totally becomes a final target for urban development planners and managers to use resources properly and to establish a balanced relationship among human, community, and nature. Proper distribution of services for decreasing spatial inequalities, promoting the quality of living environment, and approaching an urban stability requires an analytical understanding of the present situation. Understanding the present situation is the first step for making a decision and planning effectively. This paper evaluates effective parameters affecting proper arrangement of land-uses using a descriptive-analytical method, to develop a conceptual framework for understanding of the present situation of urban land-uses, based on the assessment of their compatibility. This study considers not only the local parameters, but also spatial parameters are included in this study. The results indicate that land-uses in the zone considered here are not distributed properly. Considering mentioned parameters and distributing service land-uses effectively cause the better use of these land-uses.

  1. 77 FR 60107 - National Estuarine Research Reserve System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Estuarine Research... Research Reserve Management Plan Revisions. SUMMARY: Notice is hereby given that the Estuarine Reserves..., Alaska National Estuarine Research Reserve Management Plan Revisions. The revised management plans...

  2. Guide to Developing an Environmental Management System - Plan

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  3. 75 FR 1806 - Draft General Management Plan and Environmental Impact Statement, New River Gorge National River, WV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... Interior. ACTION: Notice of availability of the Draft General Management Plan and Environmental Impact...

  4. Looking back to move forward: collaborative planning to revise the Green Mountain and Finger Lakes National Forests land and resource management plans

    Treesearch

    Michael J. Dockry

    2015-01-01

    The United States Department of Agriculture Forest Service (Forest Service) manages 154 national forests and 20 grasslands in 44 states and Puerto Rico. National Forest Land and Resource Management Plans (forest plans) form the basis for land and resource management of national forests in the United States. For more than a decade the Forest Service has been attempting...

  5. Economic Assessment: Stability, Security, Transition and Reconstruction Operations

    DTIC Science & Technology

    2007-03-13

    strategy has incorporated economic stability as a central part of post-combat operations and nation building. A viable, growing economy has also been a...and prosperity. Economic stability served as a tool for reconstruction as well as the catalyst for integration as outlined in the Marshall Plan...for future SSTR operations as it relates to economic stability is “Privatization can be a prerequisite for economic growth, especially where

  6. Two for one: a self-management plan coupled with a prescription sheet for children with asthma.

    PubMed

    Ducharme, Francine M; Noya, Francisco; McGillivray, David; Resendes, Sandy; Ducharme-Bénard, Stéphanie; Zemek, Roger; Bhogal, Sanjit Kaur; Rouleau, Rachel

    2008-10-01

    Despite strong recommendations in the asthma guidelines, the use of written self-management plans remains low among asthmatic patients. To develop a written self-management plan, based on scientific evidence and expert opinions, in a format intended to facilitate its dispensing by health care professionals, and to test the perception of its relevance and clarity by asthmatic children, adolescents and adults. Inspired by previously tested self-management plans, surveys of asthma educators, expert opinions and the 2004 Canadian Asthma Guidelines, the authors simultaneously developed French and English versions of a written self-management plan that coupled with a prescription. The self-management plan was tested in parents and their asthmatic children (aged one to 17 years), and it was revised until 85% clarity and perceived relevance was achieved. Ninety-seven children and their parents were interviewed. Twenty per cent had a self-management plan. On the final revision, nearly all items were clear and perceived relevant by 85% or more of the interviewees. Two self-management plans were designed for clinics and acute care settings, respectively. The plans are divided into three control zones identified by symptoms with optional peak flow values and symbolized by traffic light colours. They are designed in triplicate format with a prescription slip, a medical chart copy and a patient copy. The written self-management plans, based on available scientific evidence and expert opinions, are clear and perceived to be relevant by children, adolescents and their parents. By incorporating the prescription and chart copies, they were designed to facilitate dispensing by physicians in both clinics and acute care settings.

  7. Managed care quality of care and plan choice in New York SCHIP.

    PubMed

    Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G

    2009-06-01

    To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment.

  8. DECISION-MAKING IN THE SCHOOLS: AN OUTSIDER’S VIEW,

    DTIC Science & Technology

    DECISION MAKING , EDUCATION), (*EDUCATION, MANAGEMENT PLANNING AND CONTROL), (*MANAGEMENT PLANNING AND CONTROL, EDUCATION), BUDGETS, MANAGEMENT ENGINEERING, PERSONNEL MANAGEMENT, STUDENTS, LEARNING, OPTIMIZATION

  9. On Language Management in Multinational Companies in the Czech Republic

    ERIC Educational Resources Information Center

    Nekvapil, Jiri; Nekula, Marek

    2006-01-01

    In this paper, we demonstrate the dialectical relationship between micro and macro language planning: macro planning influences micro planning and yet macro planning results (or should result) from micro planning. The relation between the two planning perspectives is illustrated within the framework of Language Management Theory (Jernudd &…

  10. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Eligible planning, urban... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...

  11. Mexican humanitarian assistance system.

    DTIC Science & Technology

    2016-05-26

    Stabilization Mission in Haiti, SEDENA, Plan-DN-III- E , international relief system, Cluster system, Organization of American States, Conference of American...strategic plan for disaster relief—Plan DN-III- E . The plan contains annexes with specific instructions to different military actors and, because of...2FSArticuloSinPaginaLayout. 9 “Gaceta Parlamentaria 22 Apr 2010.” 10 Estado Mayor Defensa Nacional, Plan DN-III- E : Auxilio a La Poblacion Civil En Casos

  12. 77 FR 52054 - Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAC06000.L16100000.DQ0000.LXSS095B0000] Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final Environmental... prepared the Proposed Resource Management Plan (RMP) and Final Environmental Impact Statement (EIS) for the...

  13. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  14. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR0000.L16100000.DP0000.LXSS042K0000] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices...

  15. 75 FR 45652 - Notice of Intent To Prepare an Environmental Impact Statement and Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... Management Plan Amendment for the Proposed Modification to the Thompson Creek Mine Plan of Operations... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLIDI03000.L71220000.EX0000.XXXX... AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the...

  16. 40 CFR 60.2755 - When must I submit my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false When must I submit my waste management... waste management plan? You must submit the waste management plan no later than the date specified in... Compliance Times for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On...

  17. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  18. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  19. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  20. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  1. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  2. 40 CFR 60.2755 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... waste management plan? You must submit the waste management plan no later than the date specified in... Compliance Times for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On...

  3. 76 FR 51395 - Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... Statement for the General Management Plan (DEIS/GMP), Canaveral National Seashore, FL AGENCY: National Park... General Management Plan (DEIS/GMP), Canaveral National Seashore (Seashore). SUMMARY: Pursuant to 42 U.S.C... DEIS/GMP for Canaveral National Seashore, Florida. The document provides a framework for management...

  4. 76 FR 69217 - Approval and Promulgation of State Implementation Plans; State of Utah; Smoke Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... perspective. Five regional planning organizations (RPOs) were developed to address regional haze and related... Promulgation of State Implementation Plans; State of Utah; Smoke Management Requirements for Mandatory Class I...). R307-204 contains smoke management requirements for land managers within the State of Utah as required...

  5. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  6. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    PubMed

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  7. Marine Planning Benefits the Environment

    EPA Science Inventory

    Coastal and Marine Spatial Planning (CMSP) and Ecosystem-Based Management (EBM) are management approaches that allow sustainable coastal and ocean planning. The basic unit of management under CMSP is a large region, with the United States coastlines and Great Lakes divided into ...

  8. 5 CFR 430.305 - Planning and communicating performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...

  9. 5 CFR 430.305 - Planning and communicating performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...

  10. Solid Waste Information and Tracking System Client Server Conversion Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GLASSCOCK, J.A.

    2000-02-10

    The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion

  11. 41 CFR 105-72.305 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management § 105-72.305 Revision of budget and program plans. (a) The budget plan is the financial expression... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Revision of budget and program plans. 105-72.305 Section 105-72.305 Public Contracts and Property Management Federal Property...

  12. 77 FR 71824 - Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... a plan amendment is required to process a direct sale. The purpose of the public scoping process is...] Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an Associated..., Redding, California, intends to prepare an amendment to the 1993 Redding Resource Management Plan (RMP...

  13. Institutions Devise New Ways to Help Families Meet College Costs.

    ERIC Educational Resources Information Center

    Klinger, Donna J.

    1986-01-01

    Colleges are offering innovative financing plans, some risky, that allow families to pay college costs in a rational manner and in turn keep enrollment up. They include tuition futures plans, electronic funds transfer, gift certificates, credit card payments, megaloans, tuition stabilization plans, institutional loans, tuition matching, and…

  14. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  15. Strategic planning in Brazilian protected areas: Uses and adjustments.

    PubMed

    Barreto, Cristiane Gomes; Drummond, José Augusto L

    2017-09-15

    Management plans for protected areas commonly use strategic planning tools in their drafting. It is proposed that the adequate use of the instruments of planning and management of protected areas can improve their strategic competitiveness, providing greater financial and administrative independence, enabling them to be economically sustainable organizations. This study evaluated the application of concepts and strategy formulation, strategy principles and competitiveness, organizational diagnosis, strategic maps, scenarios, and other strategic planning instruments used for conservation management in Brazil. 25 management plans of 25 different protected areas were selected and studied, with special attention to the indicators used in each plan. Results indicate that there is a high suitability for the application of SP tools to the universe of protected areas, although management plans did not take full advantage of these tools. We also found that the broader use of these tools did not guarantee greater managerial effectiveness. We suggest that other governance variables beyond planning strategies must be improved, to ensure a better performance of protected areas. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. 40 CFR 130.9 - Designation and de-designation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...

  17. 36 CFR 219.3 - Overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... An interdisciplinary, collaborative approach to planning may be achieved by engaging the skills and... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to...

  18. A Successful Infusion Process for Enabling Lunar Exploration Technologies

    NASA Technical Reports Server (NTRS)

    Over, Ann P.; Klem, Mark K.; Motil, Susan M.

    2008-01-01

    The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.

  19. New development of China's population programme.

    PubMed

    Peng, P

    1998-06-01

    This article presents excerpts of a speech presented by the State Family Planning Commissioner of China at the UNFPA headquarters. Madame Peng Peiyun indicated that China has adopted some new decision-making processes as a follow-up to the 1994 ICPD Plan of Action. President Jiang Zemin stated that sustainable development must be achieved as part of the movement toward modernization. China places great importance on balancing population growth, social production, economic development, resources, and the environment. In 1995, the State Family Planning Commission changed its guidelines and approaches by integrating family planning (FP) within socioeconomic development and shifting to an interest oriented program integrated with social restraints and integrating FP publicity and education with comprehensive services and modern management. The FP program should meet the needs for reproductive health and contraception and be integrated within poverty alleviation and economic development schemes in rural areas. The aim is to build happy and more civil-minded farming families. Attention should be directed to the interests of farmers and the physical and psychological health of women. Programs should be voluntary. Many poverty reduction programs operated in the early 1990s. Pilot programs were established in 1995, in 11 selected counties and urban districts. The aim was to improve grassroots efforts to meet clients' needs for quality reproductive health and contraception. In 1994, providers received upgrading of skills. As the most populous country in the world, China needs UNFPA support in stabilizing population growth.

  20. QA program plan plutonium stabilization and handling project W-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, J.W.

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

Top