16 CFR 305.17 - Television labeling.
Code of Federal Regulations, 2013 CFR
2013-01-01
... this part and based on a usage rate of 5 hours in on mode and 19 hours in standby (sleep) mode per day... rate of 5 hours in on mode and 19 hours in sleep (standby) mode per day. (8) No marks or information...
16 CFR 305.17 - Television labeling.
Code of Federal Regulations, 2012 CFR
2012-01-01
... this part and based on a usage rate of 5 hours in on mode and 19 hours in standby (sleep) mode per day... rate of 5 hours in on mode and 19 hours in sleep (standby) mode per day. (8) No marks or information...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... the Commission has in rem and in personam jurisdiction. The ALJ also found that there was an... standby mode to sleep mode when the mobile phone system has been idle for a first period of time... standby mode to sleep mode when the mobile phone system has been idle for a first period of time...
Control Method for Video Guidance Sensor System
NASA Technical Reports Server (NTRS)
Howard, Richard T. (Inventor); Book, Michael L. (Inventor); Bryan, Thomas C. (Inventor)
2005-01-01
A method is provided for controlling operations in a video guidance sensor system wherein images of laser output signals transmitted by the system and returned from a target are captured and processed by the system to produce data used in tracking of the target. Six modes of operation are provided as follows: (i) a reset mode; (ii) a diagnostic mode; (iii) a standby mode; (iv) an acquisition mode; (v) a tracking mode; and (vi) a spot mode wherein captured images of returned laser signals are processed to produce data for all spots found in the image. The method provides for automatic transition to the standby mode from the reset mode after integrity checks are performed and from the diagnostic mode to the reset mode after diagnostic operations are commands is permitted only when the system is in the carried out. Further, acceptance of reset and diagnostic standby mode. The method also provides for automatic transition from the acquisition mode to the tracking mode when an acceptable target is found.
Control method for video guidance sensor system
NASA Technical Reports Server (NTRS)
Howard, Richard T. (Inventor); Book, Michael L. (Inventor); Bryan, Thomas C. (Inventor)
2005-01-01
A method is provided for controlling operations in a video guidance sensor system wherein images of laser output signals transmitted by the system and returned from a target are captured and processed by the system to produce data used in tracking of the target. Six modes of operation are provided as follows: (i) a reset mode; (ii) a diagnostic mode; (iii) a standby mode; (iv) an acquisition mode; (v) a tracking mode; and (vi) a spot mode wherein captured images of returned laser signals are processed to produce data for all spots found in the image. The method provides for automatic transition to the standby mode from the reset mode after integrity checks are performed and from the diagnostic mode to the reset mode after diagnostic operations are carried out. Further, acceptance of reset and diagnostic commands is permitted only when the system is in the standby mode. The method also provides for automatic transition from the acquisition mode to the tracking mode when an acceptable target is found.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-31
... standby mode and off mode energy consumption of those products. The petitioners demonstrated that meeting... energy consumption. 75 FR 64621. More specifically, this test procedure final rule included a standby... ae ) for gas or oil-fired furnaces or boilers and annual electric energy consumption (E e ) for...
Liu, Chuan; Gao, Peng; Xu, Shang-Cheng; Wang, Yuan; Chen, Chun-Hai; He, Min-Di; Yu, Zheng-Ping; Zhang, Lei; Zhou, Zhou
2013-11-01
To evaluate whether exposure to mobile phone radiation (MPR) can induce DNA damage in male germ cells. A mouse spermatocyte-derived GC-2 cell line was exposed to a commercial mobile phone handset once every 20 min in standby, listen, dialed or dialing modes for 24 h. DNA damage was determined using an alkaline comet assay. The levels of DNA damage were significantly increased following exposure to MPR in the listen, dialed and dialing modes. Moreover, there were significantly higher increases in the dialed and dialing modes than in the listen mode. Interestingly, these results were consistent with the radiation intensities of these modes. However, the DNA damage effects of MPR in the dialing mode were efficiently attenuated by melatonin pretreatment. These results regarding mode-dependent DNA damage have important implications for the safety of inappropriate mobile phone use by males of reproductive age and also suggest a simple preventive measure: Keeping mobile phones as far away from our body as possible, not only during conversations but during 'dialed' and 'dialing' operation modes. Since the 'dialed' mode is actually part of the standby mode, mobile phones should be kept at a safe distance from our body even during standby operation. Furthermore, the protective role of melatonin suggests that it may be a promising pharmacological candidate for preventing mobile phone use-related reproductive impairments.
Energy use of set-top boxes and telephony products in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosen, Karen B.; Meier, Alan K.; Zandelin, Stefan
2001-06-01
The goal of this investigation was to estimate the 1999 energy consumption of set-top boxes and telephony products in the U.S. residential sector. Results of this study will be used to identify new energy conservation opportunities and to align programs with those opportunities. We conducted a bottom-up analysis for set-top boxes and telephony products using our own power measurements and stock and usage estimates from secondary sources. The most common set-top boxes in U.S. homes in 1999 were analog cable boxes, digital cable boxes, wireless receivers, and game consoles. According to these measurements, analog cable boxes and wireless receivers drawmore » between 10 and 15 watts, while digital cable boxes draw between 20 and 25 watts in both the Active and Standby modes. Video games used less than 2 watts in Standby mode, and about 8 watts when Active. We estimate that set-top boxes accounted for 0.7% of residential electricity use in 1999. Our investigation of telephony products included answering machines, cordless phones, cordless phone answering machine combination units, and mobile phone chargers. Answering machines, cordless phones, and combination units use between 2 and 3 watts in both the Active and Standby modes. Mobile phone chargers use about 1 watt in standby. We estimate that these telephony products account for 0.5% of U.S. residential electricity consumption. Together, set-tops and telephony constituted 1.2% of U.S. residential electricity consumption in 1999. Standby power use accounted for about 60% of this energy use. The combined total energy use of the products investigated for this study and those researched previously for this series of reports account for about 6.6% of residential electricity use in the U.S.« less
An Energy-Efficient ASIC for Wireless Body Sensor Networks in Medical Applications.
Xiaoyu Zhang; Hanjun Jiang; Lingwei Zhang; Chun Zhang; Zhihua Wang; Xinkai Chen
2010-02-01
An energy-efficient application-specific integrated circuit (ASIC) featured with a work-on-demand protocol is designed for wireless body sensor networks (WBSNs) in medical applications. Dedicated for ultra-low-power wireless sensor nodes, the ASIC consists of a low-power microcontroller unit (MCU), a power-management unit (PMU), reconfigurable sensor interfaces, communication ports controlling a wireless transceiver, and an integrated passive radio-frequency (RF) receiver with energy harvesting ability. The MCU, together with the PMU, provides quite flexible communication and power-control modes for energy-efficient operations. The always-on passive RF receiver with an RF energy harvesting block offers the sensor nodes the capability of work-on-demand with zero standby power. Fabricated in standard 0.18-¿m complementary metal-oxide semiconductor technology, the ASIC occupies a die area of 2 mm × 2.5 mm. A wireless body sensor network sensor-node prototype using this ASIC only consumes < 10-nA current under the passive standby mode, and < 10 ¿A under the active standby mode, when supplied by a 3-V battery.
Single-Event Effect Performance of a Conductive-Bridge Memory EEPROM
NASA Technical Reports Server (NTRS)
Chen, Dakai; Wilcox, Edward; Berg, Melanie; Kim, Hak; Phan, Anthony; Figueiredo, Marco; Seidleck, Christina; LaBel, Kenneth
2015-01-01
We investigated the heavy ion single-event effect (SEE) susceptibility of the industry’s first stand-alone memory based on conductive-bridge memory (CBRAM) technology. The device is available as an electrically erasable programmable read-only memory (EEPROM). We found that single-event functional interrupt (SEFI) is the dominant SEE type for each operational mode (standby, dynamic read, and dynamic write/read). SEFIs occurred even while the device is statically biased in standby mode. Worst case SEFIs resulted in errors that filled the entire memory space. Power cycle did not always clear the errors. Thus the corrupted cells had to be reprogrammed in some cases. The device is also vulnerable to bit upsets during dynamic write/read tests, although the frequency of the upsets are relatively low. The linear energy transfer threshold for cell upset is between 10 and 20 megaelectron volts per square centimeter per milligram, with an upper limit cross section of 1.6 times 10(sup -11) square centimeters per bit (95 percent confidence level) at 10 megaelectronvolts per square centimeter per milligram. In standby mode, the CBRAM array appears invulnerable to bit upsets.
77 FR 28805 - Energy Conservation Program: Test Procedures for Microwave Ovens
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
...On November 23, 2011, the U.S. Department of Energy (DOE) issued a supplemental notice of proposed rulemaking (SNOPR) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test procedure to incorporate provisions from the International Electrotechnical Commission (IEC) Standard 62301, ``Household electrical appliances--Measurement of standby power,'' Edition 2.0 2011-01 (IEC Standard 62301 (Second Edition)). Today's SNOPR proposes additional provisions for measuring the standby mode and off mode energy use of products that combine a microwave oven with other appliance functionality, as well as minor technical clarifications.
16 CFR 305.17 - Television labeling.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (sleep) mode per day, and an electricity cost rate of 11 cents per kWh. (5) The applicable ranges of... hours in sleep (standby) mode per day. (8) No marks or information other than that specified in this...
CE dual-homing protection in layer 1 VPN
NASA Astrophysics Data System (ADS)
Du, Shu; Peng, Yunfeng; Long, Keping
2008-11-01
Layer 1 VPN (L1VPN) extends the notion of VPN to the optical domain to provide virtually dedicated circuit like leased lines, so that the security is more enhanced. Despite their secure gains from channel isolation, VPNs still suffer fragilities resulting from link-failures or node-failures. Extensive activities on survivability designs for wavelength-routed optical networks are proposed, including various protection and restoration schemes, but concerns on network edge are rare. Dual-homing is an effective skill to achieve survivability gains for L1VPNs. There are two dual-homing mode: Active/Standby mode and Load-Sharing mode In this paper, we investigate the problem of PE assignment, which is the key of dual-homing design and is NP-hard. We formulate it as an integer programming problem, and propose heuristic solutions. Simulation results show that the proposed solutions work in a correct and effective way and the Load-Sharing mode has higher bandwidth efficiency than Active/Standby mode.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
...Where appropriate, the U.S. Department of Energy (DOE) has proposed to amend its test procedures for residential dishwashers, dehumidifiers, and conventional cooking products (which includes cooktops, ovens, and ranges) to include provisions for measuring standby mode and off mode energy consumption, as required by the Energy Independence and Security Act of 2007 (EISA 2007). These test procedure amendments would incorporate by reference certain provisions of the International Electrotechnical Commission (IEC) Standard 62301, ``Household electrical appliances--Measurement of standby power.'' Since publication of DOE's initial proposal in December 2010, the IEC has replaced the First Edition of this standard with the current Second Edition. This supplemental notice of proposed rulemaking proposes to incorporate the latest edition of IEC Standard 62301.
Urbinello, Damiano; Röösli, Martin
2013-01-01
When moving around, mobile phones in stand-by mode periodically send data about their positions. The aim of this paper is to evaluate how personal radiofrequency electromagnetic field (RF-EMF) measurements are affected by such location updates. Exposure from a mobile phone handset (uplink) was measured during commuting by using a randomized cross-over study with three different scenarios: disabled mobile phone (reference), an activated dual-band phone and a quad-band phone. In the reference scenario, uplink exposure was highest during train rides (1.19 mW/m(2)) and lowest during car rides in rural areas (0.001 mW/m(2)). In public transports, the impact of one's own mobile phone on personal RF-EMF measurements was not observable because of high background uplink radiation from other people's mobile phone. In a car, uplink exposure with an activated phone was orders of magnitude higher compared with the reference scenario. This study demonstrates that personal RF-EMF exposure is affected by one's own mobile phone in stand-by mode because of its regular location update. Further dosimetric studies should quantify the contribution of location updates to the total RF-EMF exposure in order to clarify whether the duration of mobile phone use, the most common exposure surrogate in the epidemiological RF-EMF research, is actually an adequate exposure proxy.
A 380pW Dual Mode Optical Wake-up Receiver with Ambient Noise Cancellation.
Lim, Wootaek; Jang, Taekwang; Lee, Inhee; Kim, Hun-Seok; Sylvester, Dennis; Blaauw, David
2016-06-01
We present a sub-nW optical wake-up receiver for wireless sensor nodes. The wake-up receiver supports dual mode operation for both ultra-low standby power and high data rates, while canceling ambient in-band noise. In 0.18µm CMOS the receiver consumes 380pW in always-on wake-up mode and 28.1µW in fast RX mode at 250kbps.
A 380pW Dual Mode Optical Wake-up Receiver with Ambient Noise Cancellation
Lim, Wootaek; Jang, Taekwang; Lee, Inhee; Kim, Hun-Seok; Sylvester, Dennis; Blaauw, David
2016-01-01
We present a sub-nW optical wake-up receiver for wireless sensor nodes. The wake-up receiver supports dual mode operation for both ultra-low standby power and high data rates, while canceling ambient in-band noise. In 0.18µm CMOS the receiver consumes 380pW in always-on wake-up mode and 28.1µW in fast RX mode at 250kbps. PMID:28392978
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
.... Treatment of Fossil-Fuel Consumption in Existing Test Procedures for Fossil-Fuel Vented Heaters 2. Specific.... Proposed Test Procedure Amendments for Pool Heaters 1. Treatment of Fossil-Fuel Consumption in Existing.... Fossil-fuel standby mode and off mode energy use is already integrated into the vented [[Page 52895...
76 FR 72332 - Energy Conservation Program: Test Procedure for Microwave Ovens
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... Energy Conservation Program: Test Procedure for Microwave Ovens AGENCY: Office of Energy Efficiency and.... Department of Energy (DOE) published an interim final rule on March 9, 2011, amending its test procedures for... standby mode and off mode power use by microwave ovens. Those amendments incorporated into the DOE test...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-06
... clarify application of these provisions for measuring standby mode and off mode power consumption in.... Measures of Energy Consumption a. Clothes Dryers b. Room Air Conditioners C. Clothes Dryer and Room Air... the Per-Cycle Gas Dryer Continuously Burning Pilot Light Gas Energy Consumption 9. Clarification of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-17
... publicly available, such as information that is exempt from public disclosure. A link to the docket Web.... The regulations.gov Web page will contain simple instructions on how to access all documents...: (202) 287-6307. Email: [email protected] . SUPPLEMENTARY INFORMATION: Table of Contents I. Summary...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... for Residential Furnaces and Boilers (Standby Mode and Off Mode); Correction AGENCY: Office of Energy... Consumer Products: Test Procedures for Residential Furnaces and Boilers. This correction provides the... page 56339, in the third column after ``2. E- mail:'' the e-mail address should read `` FurnaceBoiler...
Code of Federal Regulations, 2011 CFR
2011-01-01
... power (i.e., watts) consumed as the time series integral of the power consumed over a 1-hour test period...) consumed as the time series integral of the power consumed over a 1-hour test period, divided by the period...-maintenance mode and standby mode over time periods defined in the test procedure. b. Active mode is the...
Code of Federal Regulations, 2010 CFR
2010-01-01
... power (i.e., watts) consumed as the time series integral of the power consumed over a 1-hour test period...) consumed as the time series integral of the power consumed over a 1-hour test period, divided by the period...-maintenance mode and standby mode over time periods defined in the test procedure. b. Active mode is the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-14
... the time- series of costs and benefits into annualized values. First, DOE calculated a present value... the present value, DOE then calculated the corresponding time- series of fixed annual payments over a... does not imply that the time-series of cost and benefits from which the annualized values were...
Code of Federal Regulations, 2012 CFR
2012-01-01
... standby mode, set the clock time to 3:23 and use the average power approach described in Section 5... ranges, conventional cooking tops, conventional ovens, and microwave ovens at this time. However, any... mode may persist for an indefinite time. An indicator that only shows the user that the product is in...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Payne, Christopher T.; Meier, Alan K.
2004-08-24
An increasing amount of electricity is used by equipment that is neither fully ''on'' nor fully ''off.'' We call these equipment states low power modes, or ''lopomos.'' ''Standby'' and ''sleep'' are the most familiar lopomos, but some new products already have many modes. Lopomos are becoming common in household appliances, safety equipment, and miscellaneous products. Ross and Meier (2000) reports that several international studies have found standby power to be as much as 10 percent of residential energy consumption. Lopomo energy consumption is likely to continue growing rapidly as products with lopomos that use significant amounts of energy penetrate themore » market. Other sectors such as commercial buildings and industry also have lopomo energy use, perhaps totaling more in aggregate than that of households, but no comprehensive measurements have been made. In this paper, we propose a research agenda for study of lopomo energy consumption. This agenda has been developed with input from over 200 interested parties. Overall, there is consensus that lopomo energy consumption is an important area for research. Many see this as a critical time for addressing lopomo issues. As equipment designs move from the binary ''on/off'' paradigm to one that encompasses multiple power modes, there is a unique opportunity to address the issue of low power mode energy consumption while technology development paths are still flexible.« less
Energy Use of Home Audio Products in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosen, K.B.; Meier, A.K.
1999-12-01
We conducted a bottom-up analysis using stock and usage estimates from secondary sources, and our own power measurements. We measured power levels of the most common audio products in their most commonly used operating modes. We found that the combined energy consumption of standby, idle, and play modes of clock radios, portable stereos, compact stereos, and component stereos was 20 TWh/yr, representing about 1.8% of the 1998 national residential electricity consumption.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-20
... and oil-fired furnaces and boilers consume both fossil fuel and electricity. Electric furnaces and boilers only consume electricity. In this test procedure, fossil-fuel energy consumption is accounted for comprehensively over a full-year cycle, thereby satisfying EISA 2007 requirements for fossil-fuel standby mode and...
10 CFR 431.322 - Definitions concerning metal halide lamp ballasts and fixtures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... main functions. Ballast means a device used with an electric discharge lamp to obtain necessary circuit... purpose of controlling the ballast and putting the ballast in standby mode. Electronic ballast means a... instead starts lamps with high ballast open circuit voltage. Pulse-start metal halide ballast means an...
Code of Federal Regulations, 2012 CFR
2012-01-01
... procedures contained in the EnergyStar Version 4.2 test, which is comprised of the ENERGY STAR Program... and 19 hours in sleep (standby) mode per day. These ENERGY STAR requirements are incorporated by... inspected or obtained at the United States Environmental Protection Agency, ENERGY STAR Hotline (6202J...
Code of Federal Regulations, 2013 CFR
2013-01-01
... procedures contained in the EnergyStar Version 4.2 test, which is comprised of the ENERGY STAR Program... and 19 hours in sleep (standby) mode per day. These ENERGY STAR requirements are incorporated by... inspected or obtained at the United States Environmental Protection Agency, ENERGY STAR Hotline (6202J...
Code of Federal Regulations, 2014 CFR
2014-01-01
... procedures contained in the ENERGY STAR Version 4.2 test, which is comprised of the ENERGY STAR Program... and 19 hours in sleep (standby) mode per day. These ENERGY STAR requirements are incorporated by... inspected or obtained at the United States Environmental Protection Agency, ENERGY STAR Hotline (6202J...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
40 CFR 86.339-79 - Pre-test procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Pre-test procedures. 86.339-79 Section... New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test Procedures § 86.339-79 Pre-test procedures. (a) Allow a minimum of 30 minutes warm-up in the stand-by or operating mode prior...
A Hybrid Converter for Improving Light Load Efficiency
NASA Astrophysics Data System (ADS)
Takahashi, Masaya; Nishijima, Kimihiro; Nagao, Michihiko; Sato, Terukazu; Nabeshima, Takashi
In order to reduce power consumption of electronic equipment in stand-by mode, idle-mode and sleep-mode, a simple efficiency improvement technique for switching regulator in light load region is proposed. In this technique, under the light load, the small switching elements in a MOSFET driver circuit are used instead of the switching elements in a main regulator circuit to reduce driving losses. Of course, under the load heavier than light load, the MOSFET driver drives the switching elements in the main regulator circuit. The efficiency of a 2.5V/5A prototype buck converter is improved from 47.1% to 72.7% by using the proposed technique.
Single-Event Effect Performance of a Conductive-Bridge Memory EEPROM
NASA Technical Reports Server (NTRS)
Chen, Dakai; Wilcox, Edward; Berg, Melanie; Kim, Hak; Phan, Anthony; Figueiredo, Marco; Seidleck, Christina; LaBel, Kenneth
2015-01-01
We investigated the heavy ion SEE characteristics of an EEPROM based on CBRAM technology. SEFI is the dominant type of SEE for each operating mode (standby, read-only, write/read). We also observed single bit upsets in the CBRAM cell, during write/read tests. the SEULET threshold is between 10 and 20 MeV * sq cm/mg, with an upper fluence limit of 3 × 10(exp 6) cm(exp -2) at 10 MeV * sq cm/mg. In the stand by mode, the CBRAM array appears immune to bit upsets.
Code of Federal Regulations, 2014 CFR
2014-01-01
... extinguishing the lamp is impossible or for low-frequency electronic ballasts, the following alternative... (V), and current, using an ammeter (A) connected to the ballast in accordance with the circuit shown... ballast in accordance with the circuit shown in Figure 2. ER09MR10.006 (iii) Power Line Carrier (PLC...
Code of Federal Regulations, 2013 CFR
2013-01-01
... extinguishing the lamp is impossible or for low-frequency electronic ballasts, the following alternative... (V), and current, using an ammeter (A) connected to the ballast in accordance with the circuit shown... ballast in accordance with the circuit shown in Figure 2. ER09MR10.006 (iii) Power Line Carrier (PLC...
Code of Federal Regulations, 2012 CFR
2012-01-01
... extinguishing the lamp is impossible or for low-frequency electronic ballasts, the following alternative... (V), and current, using an ammeter (A) connected to the ballast in accordance with the circuit shown... ballast in accordance with the circuit shown in Figure 2. ER09MR10.006 (iii) Power Line Carrier (PLC...
Enhanced Component Performance Study: Motor-Driven Pumps 1998–2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schroeder, John Alton
2016-02-01
This report presents an enhanced performance evaluation of motor-driven pumps at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The motor-driven pump failure modes considered for standby systems are failure to start, failure to run less than or equal to one hour, and failure to run more than one hour; for normally running systems, the failure modes considered are failure to start and failure tomore » run. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified in pump run hours per reactor year. Statistically significant decreasing trends were identified for standby systems industry-wide frequency of start demands, and run hours per reactor year for runs of less than or equal to one hour.« less
Spurious-Mode Control of Same-Phase Drive-Type Ultrasonic Motor
NASA Astrophysics Data System (ADS)
Aoyagi, Manabu; Watanabe, Hiroyuki; Tomikawa, Yoshiro; Takano, Takehiro
2002-05-01
A same-phase drive-type ultrasonic motor requires a single power source for its operation. In particular, self-oscillation driving is useful for driving a small ultrasonic motor. This type of ultrasonic motor has a spurious mode close to the operation frequency on its stator vibrator. The spurious vibration mode affects the oscillation frequency of a self-oscillation drive circuit. Hence the spurious vibration mode should be restrained or moved away from the neighborhood of the operation frequency. In this paper, we report that an inductor connected at an electrical control terminal provided on standby electrodes for the reverse rotation operation controls only the spurious vibration mode. The effect of an inductor connected at the control terminal was clarified by the simulation of an equivalent circuit and some experiments.
49 CFR 234.251 - Standby power.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Standby power. 234.251 Section 234.251 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., Inspection, and Testing Inspections and Tests § 234.251 Standby power. Standby power shall be tested at least...
49 CFR 234.251 - Standby power.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Standby power. 234.251 Section 234.251 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., Inspection, and Testing Inspections and Tests § 234.251 Standby power. Standby power shall be tested at least...
Review of Standby and Ancillary Services in the Context of Behind-the-Meter Photovoltaics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gagnon, Pieter J; Holm, Alison
The New Mexico Public Regulatory Commission (NMPRC) requested information on the following topics: Overview of ancillary and standby services. Examples of how ancillary and standby services are defined, used, and analyzed in other jurisdictions. Considerations regarding how ancillary and standby services may be economically valued. Background information on how ancillary and standby services differ from fixed costs to serve owners of behind-the-meter solar photovoltaic (BTM PV) systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ballast in accordance with the circuit shown in Figure 2. ER09MR10.006 (iii) Power Line Carrier (PLC) Control Signal. Measure the PLC control signal power (watts), using a wattmeter capable of indicating true... wattmeter must have a frequency response that is at least 10 times higher than the PLC being measured to...
Integrated Inverter And Battery Charger
NASA Technical Reports Server (NTRS)
Rippel, Wally E.
1988-01-01
Circuit combines functions of dc-to-ac inversion (for driving ac motor in battery-powered vehicle) and ac-to-dc conversion (for charging battery from ac line when vehicle not in use). Automatically adapts to either mode. Design of integrated inverter/charger eliminates need for duplicate components, saves space, reduces weight and cost of vehicle. Advantages in other applications : load-leveling systems, standby ac power systems, and uninterruptible power supplies.
17 CFR 270.2a41-1 - Valuation of standby commitments by registered investment companies.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., and will be considered to be from the party to whom the investment company will look for payment of... standby commitment is not used to affect the company's valuation of the security or securities underlying the standby commitment; and (2) Any consideration paid by the company for the standby commitment...
40 CFR 280.103 - Standby trust fund.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Standby trust fund. 280.103 Section... (UST) Financial Responsibility § 280.103 Standby trust fund. (a) An owner or operator using any one of the mechanisms authorized by §§ 280.96, 280.98, or 280.99 must establish a standby trust fund when the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... of Unvented Home Heating Equipment G Appendix G to Subpart B of Part 430 Energy DEPARTMENT OF ENERGY..., App. G Appendix G to Subpart B of Part 430—Uniform Test Method for Measuring the Energy Consumption of... gas control value (e.g., by label) by the manufacturer. 2.4 Electrical standby mode power measurement...
76 FR 49237 - Energy Conservation Program: Test Procedures for Residential Clothes Washers
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
...In this supplemental notice of proposed rulemaking (SNOPR), the U.S. Department of Energy (DOE) proposes to revise its test procedure for residential clothes washers established under the Energy Policy and Conservation Act (EPCA). DOE proposes to incorporate provisions of the International Electrotechnical Commission (IEC) Standard 62301, ``Household electrical appliances--Measurement of standby power'' (Second Edition). DOE also proposes to update the provisions for measuring active mode energy and water consumption.
Balloonborne Lidar Experiment.
1980-12-24
predictable. 1he balloon will be launched with the lidar in standby mode. When an altitude of ib km has been attained, the baroswitch will be opened ...loon will be vaiveo cown to lower altitudes (-bU,0UU ft) and the balloon ruptured on command. lhe payload parachute will open ano the payloac will...values of the quantum efficiencies of the photomultipliers were used, as well as transmission and reflection efficiencies of the optics. The field of
Modeling, Simulation, and Analysis of Quantum Transport.
1991-03-15
mode operation is important to prevent standby power dissipation in circuits. The relevant struc- ture consists of a quantum well one half of which...is intentionally doped while the other half is left undoped. In the absence of any external electric field, electrons mostly reside in the doped half ...electron wavefunction to the undoped half in which the mobility is much higher because of the absence of in-situ impurity scatterir". Consequently the
Fiber optically isolated and remotely stabilized data transmission system
Nelson, Melvin A.
1992-01-01
A fiber optically isolated and remotely stabilized data transmission system s described wherein optical data may be transmitted over an optical data fiber from a remote source which includes a data transmitter and a power supply at the remote source. The transmitter may be remotely calibrated and stabilized via an optical control fiber, and the power source may be remotely cycled between duty and standby modes via an optical control fiber.
Fiber optically isolated and remotely stabilized data transmission system
Nelson, M.A.
1992-11-10
A fiber optically isolated and remotely stabilized data transmission systems described wherein optical data may be transmitted over an optical data fiber from a remote source which includes a data transmitter and a power supply at the remote source. The transmitter may be remotely calibrated and stabilized via an optical control fiber, and the power source may be remotely cycled between duty and standby modes via an optical control fiber. 3 figs.
Standby gasoline rationing plan
DOT National Transportation Integrated Search
1980-06-01
Title 10 - Energy, Chapter II - Department of Energy, PART 570 - Standby gasoline rationing plan regulations. Final rules adopted by the President for a Standby Gasoline Rationing Plan required by the Energy Policy and Conservation Act of 1979 (P.L. ...
12 CFR 960.3 - Standby letters of credit on behalf of housing associates.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND OFF-BALANCE SHEET ITEMS STANDBY LETTERS OF CREDIT § 960.3 Standby letters of credit on behalf of... facilitating residential or commercial mortgage lending that benefits individuals or families meeting the...
12 CFR 960.2 - Standby letters of credit on behalf of members.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OFF-BALANCE SHEET ITEMS STANDBY LETTERS OF CREDIT § 960.2 Standby letters of credit on behalf of... facilitating community lending; (3) To assist members with asset/liability management; or (4) To provide...
Gallego-Schmid, Alejandro; Mendoza, Joan Manuel F; Azapagic, Adisa
2018-03-15
More than 130 million microwaves are affected by European Union (EU) legislation which is aimed at reducing the consumption of electricity in the standby mode ('Standby Regulation') and at more sustainable management of end-of-life electrical and electronic waste ('WEEE Directive'). While legislation focuses on these two life cycle stages, there is little information on the environmental impacts of the entire life cycle of microwaves. To address this gap, this paper presents a comprehensive life cycle assessment of microwaves and assesses the environmental implications of the Standby Regulation and the WEEE Directive at the EU level. The impacts are first considered at the level of individual appliances and then at the EU level, with the aim of evaluating the potential environmental implications of the full implementation of the above two EU regulations by 2020. The effects of the electricity decarbonisation and the expected increase in the number of microwaves in use have also been considered. The results suggest that implementation of the EU regulation by 2020 will reduce the environmental impacts considered by 4%-9% compared to the current situation. The majority of these reductions is due to the Standby Regulation, with the contribution of the WEEE Directive being small (~0.3%). However, the expected decarbonisation of electricity will result in much higher reductions (6%-24%) for most impact categories. The results also show that the materials used to manufacture the microwaves, the manufacturing process and end-of-life disposal are environmental hot-spots for several impacts, including depletion of abiotic elements. Therefore, efforts to reduce the environmental impacts of a future electricity mix should be combined with the development of specific eco-design regulations for microwaves that stipulate optimisation of resource consumption. Possible future trends, such as shorter lifetimes and limited availability of some resources, make the development of such product regulations more critical. Copyright © 2017 Elsevier B.V. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-31
...The U.S. Department of Energy (DOE) establishes new test procedures for residential dishwashers and dehumidifiers, and amends the currently applicable test procedure for conventional cooking products under the Energy Policy and Conservation Act. The new test procedures include provisions for measuring standby mode and off mode energy consumption, and update the provisions for measuring active mode energy consumption and, for dishwashers, water consumption. This final rule also amends the certification, compliance, and enforcement requirements for dishwashers, dehumidifiers and conventional cooking products, amends certain provisions in the currently applicable dishwasher test procedure, and eliminates an obsolete energy efficiency metric in the dishwasher test procedure and provisions in the cooking products test procedure that have become obsolete due to the elimination of standing pilot lights.
2002-07-25
KENNEDY SPACE CENTER, FLA. -- In Vehicle Assembly Building (VAB) high bay 4, installation of a Payload Bay Door Drying Enclosure is in progress. The enclosure will keep moisture from being absorbed into the graphite epoxy used on the payload bay doors of the Shuttle orbiters with the assistance of mini-Portable Purge Units (PPUs). Once in operation, the enclosure will allow NASA the option to store an orbiter in the VAB bay up to 180 days in a "standby-to-stack" mode.
2002-07-25
KENNEDY SPACE CENTER, FLA. -- In Vehicle Assembly Building (VAB) high bay 4, installation of a Payload Bay Door Drying Enclosure is in progress. The enclosure will keep moisture from being absorbed into the graphite epoxy used on the payload bay doors of the Shuttle orbiters with the assistance of mini-Portable Purge Units (PPUs). Once in operation, the enclosure will allow NASA the option to store an orbiter in the VAB bay up to 180 days in a "standby-to-stack" mode.
2002-07-26
KENNEDY SPACE CENTER, FLA. -- -- In Vehicle Assembly Building (VAB) high bay 4, installation of a Payload Bay Door Drying Enclosure is in progress. The enclosure will keep moisture from being absorbed into the graphite epoxy used on the payload bay doors of the Shuttle orbiters with the assistance of mini-Portable Purge Units (PPUs). Once in operation, the enclosure will allow NASA the option to store an orbiter in the VAB bay up to 180 days in a "standby-to-stack" mode.
Fitment of ’TAMAM’ Standby Attitude Indicators to Macchi Aircraft.
1980-08-01
A.Dr-A .. 7 AIRCRAFT RESEARCH AND DEVELOPMENT UNIT EDINBURGH (AUS--ETC FIG 1/4 FITMENT OF ITAMAM’ STANDBY ATTITUDE INDICATORS TO MACCHI AIRCRA--ETC(U...REPIST( [IC’.4. T SERVICE . . .. , -- 7 i:.)U.,L ATO SHLL ThIS REPORT FITMENT OF ’TAMAM’ STANDBY= ATTITUDE INDICATORS L .-iTO MACCHI AIRCRAFT j APPROVED...TI-683 Isolation: UNCLAS Other c. Summary in Numbers: Isolation: UNCLAS 3 TITLE ] FITMENT OF ’TAMAN’ STANDBY ATTITUDE INDICATORS TO MACCHI AIRCRAFT
46 CFR Sec. 3 - Standby agreements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Standby agreements. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS FEDERAL PORT CONTROLLERS Sec. 3 Standby agreements. The Director, NSA, may negotiate the standard form of service agreement, specified in...
46 CFR Sec. 2 - Stand-by agreements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Stand-by agreements. Sec. 2 Section 2 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS OPERATING CONTRACT Sec. 2 Stand-by agreements. The Director NSA, Maritime Administration, in advance of an emergency, may negotiate...
46 CFR Sec. 2 - Stand-by agreements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Stand-by agreements. Sec. 2 Section 2 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS OPERATING CONTRACT Sec. 2 Stand-by agreements. The Director NSA, Maritime Administration, in advance of an emergency, may negotiate...
46 CFR Sec. 3 - Standby agreements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Standby agreements. Sec. 3 Section 3 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION B-CONTROL AND UTILIZATION OF PORTS FEDERAL PORT CONTROLLERS Sec. 3 Standby agreements. The Director, NSA, may negotiate the standard form of service agreement, specified in...
33 CFR 143.401 - Vessel certification and operation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.401... that the standby vessel is designated to assist. Crew spaces may be used to meet the requirements of... persons on the most populated facility that the standby vessel is designated to assist. Crew spaces may be...
33 CFR 143.401 - Vessel certification and operation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.401... that the standby vessel is designated to assist. Crew spaces may be used to meet the requirements of... persons on the most populated facility that the standby vessel is designated to assist. Crew spaces may be...
33 CFR 143.401 - Vessel certification and operation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.401... that the standby vessel is designated to assist. Crew spaces may be used to meet the requirements of... persons on the most populated facility that the standby vessel is designated to assist. Crew spaces may be...
33 CFR 143.401 - Vessel certification and operation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.401... that the standby vessel is designated to assist. Crew spaces may be used to meet the requirements of... persons on the most populated facility that the standby vessel is designated to assist. Crew spaces may be...
33 CFR 143.401 - Vessel certification and operation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.401... that the standby vessel is designated to assist. Crew spaces may be used to meet the requirements of... persons on the most populated facility that the standby vessel is designated to assist. Crew spaces may be...
12 CFR 614.4810 - Standby letters of credit.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 12 Banks and Banking 7 2012-01-01 2012-01-01 false Standby letters of credit. 614.4810 Section 614.4810 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM LOAN POLICIES AND OPERATIONS Banks for Cooperatives and Agricultural Credit Banks Financing International Trade § 614.4810 Standby...
Design and evaluation of an electrohydraulic servoactuator using active standby redundancy
NASA Technical Reports Server (NTRS)
Anderson, R. L.; Cover, W. E.
1972-01-01
The application is described of active standby redundancy techniques to a large electrohydraulic servoactuator. The advantages and limitations of active standby redundancy are identified. Special areas of investigation during the development test phase of the program were the evaluation of output transients as a function of channel switching and the nuisance switching characteristics of the system. The feasibility of constructing large electrohydraulic servoactuators using active standby redundancy was successfully demonstrated. In particular the stability and predictability of a properly designed hydromechanical failure detector was demonstrated.
Sterk, Maaike; Romilly, Cédric; Wagner, E Gerhart H
2018-01-01
Abstract Initiation is the rate-limiting step in translation. It is well-known that stable structure at a ribosome binding site (RBS) impedes initiation. The ribosome standby model of de Smit and van Duin, based on studies of the MS2 phage coat cistron, proposed how high translation rates can be reconciled with stable, inhibitory structures at an RBS. Here, we revisited the coat protein system and assessed the translation efficiency from its sequestered RBS by introducing standby mutations. Further experiments with gfp reporter constructs assessed the effects of 5′-tails—as standby sites—with respect to length and sequence contributions. In particular, combining in vivo and in vitro assays, we can show that tails of CA-dinucleotide repeats—and to a lesser extent, AU-repeats—dramatically increase translation rates. Tails of increasing length reach maximal rate-enhancing effects at 16–18 nucleotides. These standby tails are single-stranded and do not exert their effect by structure changes in the neighboring RBS stem–loop. In vitro translation and toeprinting assays furthermore demonstrate that standby effects are exerted at the level of translation initiation. Finally, as expected, destabilizing mutations within the coat RBS indicate an interplay with the effects of standby tails. PMID:29420821
Study of alternate methods of disposal of propellants and gases at KSC
NASA Technical Reports Server (NTRS)
Moore, W. I.
1970-01-01
A comprehensive study was conducted at KSC launch support facilities to determine the nature and extent of potential hazards from propellant and gas releases to the environment. The results of the study, alternate methods for reducing or eliminating the hazards, and recommendations pertaining to these alternatives are presented. The operational modes of the propellant or hazardous gas systems considered include: system charging, system standby, system operation, and post-test operations. The results are outlined on an area-by-area basis.
31 CFR 585.518 - Certain standby letters of credit and performance bonds.
Code of Federal Regulations, 2010 CFR
2010-07-01
... reimbursement that is required by applicable law. (c) Where there is outstanding a demand for payment under a... Certain standby letters of credit and performance bonds. (a) Notwithstanding any other provision of law... confirming bank shall receive such demand for payment under such a standby letter of credit, it shall...
Temperature initiated passive cooling system
Forsberg, Charles W.
1994-01-01
A passive cooling system for cooling an enclosure only when the enclosure temperature exceeds a maximum standby temperature comprises a passive heat transfer loop containing heat transfer fluid having a particular thermodynamic critical point temperature just above the maximum standby temperature. An upper portion of the heat transfer loop is insulated to prevent two phase operation below the maximum standby temperature.
Should the next standby power target be 0-watt?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meier, Alan; Siderius, Hans-Paul
The standby power use of appliances continues to consume large amounts of electricity. Considerable success has been made in reducing each device’s use, but these savings have been offset by a huge increase in the number of products using standby power and new power requirements for maintaining network connections. Current strategies to reduce standby have limitations and may not be most appropriate for emerging energy consumption trends. A new strategy for further reductions in standby, the “Standzero” option, encourages electrical products to be designed to operate for short periods without relying on mains-supplied electricity. Energy savings are achieved through enhancedmore » efficiency and by harvesting ambient energy. A sensitivity analysis suggests many appliances could be designed to operate for at least an hour without relying on mains power and, in some cases, may be able to operate indefinitely at zero watts until activated.« less
Temperature initiated passive cooling system
Forsberg, C.W.
1994-11-01
A passive cooling system for cooling an enclosure only when the enclosure temperature exceeds a maximum standby temperature comprises a passive heat transfer loop containing heat transfer fluid having a particular thermodynamic critical point temperature just above the maximum standby temperature. An upper portion of the heat transfer loop is insulated to prevent two phase operation below the maximum standby temperature. 1 fig.
Standby Rates for Combined Heat and Power Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sedano, Richard; Selecky, James; Iverson, Kathryn
2014-02-01
Improvements in technology, low natural gas prices, and more flexible and positive attitudes in government and utilities are making distributed generation more viable. With more distributed generation, notably combined heat and power, comes an increase in the importance of standby rates, the cost of services utilities provide when customer generation is not operating or is insufficient to meet full load. This work looks at existing utility standby tariffs in five states. It uses these existing rates and terms to showcase practices that demonstrate a sound application of regulatory principles and ones that do not. The paper also addresses areas formore » improvement in standby rates.« less
5 CFR 551.431 - Time spent on standby duty or in an on-call status.
Code of Federal Regulations, 2011 CFR
2011-01-01
... § 551.431 Time spent on standby duty or in an on-call status. (a)(1) An employee is on duty, and time... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Time spent on standby duty or in an on-call status. 551.431 Section 551.431 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL...
5 CFR 551.431 - Time spent on standby duty or in an on-call status.
Code of Federal Regulations, 2010 CFR
2010-01-01
... § 551.431 Time spent on standby duty or in an on-call status. (a)(1) An employee is on duty, and time... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Time spent on standby duty or in an on-call status. 551.431 Section 551.431 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL...
Alternative Methods to Standby Gain Scheduling Following Air Data System Failure
2009-09-01
in the event of air data system failures. There are two problems with this current method. First, the pilot must take time away from other ...pertinent tasks to manually position the standby-gains via the landing gear handle, air-to-air refueling door switch or some other means. Second, the...the way, the original airspeed estimator was improved and two other alternatives to standby-gain-scheduling were investigated. Knowing what
NASA Astrophysics Data System (ADS)
Ke, Jyh-Bin; Lee, Wen-Chiung; Wang, Kuo-Hsiung
2007-07-01
This paper presents the reliability and sensitivity analysis of a system with M primary units, W warm standby units, and R unreliable service stations where warm standby units switching to the primary state might fail. Failure times of primary and warm standby units are assumed to have exponential distributions, and service times of the failed units are exponentially distributed. In addition, breakdown times and repair times of the service stations also follow exponential distributions. Expressions for system reliability, RY(t), and mean time to system failure, MTTF are derived. Sensitivity analysis, relative sensitivity analysis of the system reliability and the mean time to failure, with respect to system parameters are also investigated.
The automatic control system and stand-by facilities of the TDMA-40 equipment
NASA Astrophysics Data System (ADS)
Gudenko, D. V.; Pankov, G. Kh.; Pauk, A. G.; Tsirlin, V. M.
1980-10-01
When a controlling station in a satellite communications system is out of order, a complex algorithm must be carried out for automatic operation of the stand-by equipment. A processor has been developed to perform this algorithm, as well as operations involving the stand-by facilities of the receiving-transmitting equipment of the station. The design principles and solutions to problems in developing the equipment for the monitoring and controlling systems are described. These systems are based on multistation access using time division multiplexing. Algorithms are presented for the operation of the synchronizing processor and the control processor of the equipment. The automatic control system and stand-by facilities make it possible to reduce the service personnel and to design an unattended station.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lin, Jiang; Li, Tienan; Li, Aizhen
With the popularization of household electrical appliances and the rapid development of office automation and networking, a huge number of consumer electronic devices, computers, copiers, and fax machines have been put into use in China over the last two decades. These products almost all use a certain amount of standby power--the power that is consumed when a device is connected but not performing its primary function. The rapid growth of standby energy consumption due to these products--and the consequent environmental problems--has attracted more and more attentions from researchers and from many government and international agencies. Numerous countries have developed policiesmore » and measures to restrict and reduce standby energy consumption (US EPA, 2004, IEA, 2001, and GEEA, 2004). However, standby energy consumption is still a new concept for Chinese consumers and the phenomenon of ''unconscious waste of energy'' is still very common in the people's daily life and work. With the goal of reducing China's standby energy consumption, China Certification Center for Energy Conservation Products (CECP) and the Lawrence Berkeley National Laboratory (LBNL) have, under the sponsorship of the Energy Foundation (EF), entered into a collaboration to develop technical requirements for CECP's labeling program for consumer electronics and office equipment. These technical requirements will be used to qualify products for CECP's energy efficiency endorsement label in China. In the phase I of this collaborative project, CECP and LBNL conducted technical and economic research on televisions and printers in China. Based on the results of this research, CECP developed specifications for, and carried out corresponding energy conservation certifications for these two products. CECP's standby power certification program has made impressive gains in China. Leading manufacturers, such as Haier, Hesons, TCL, Chuangwei, Lenovo, EPSON, Fujitsu, and Brother have participated in CECP's certification activities. Media events organized by CECP have greatly improved the country's awareness of standby power loss. Reducing standby power loss has been formally incorporated into China's energy efficiency policy portfolio and in China's collaboration with the international community on the subject of energy efficiency (IEA, 2001). In phase II of the program, CECP's main task was to assess the market for DVD/VCD (Digital Versatile/Video Disc and Video Compact Disc) players and copiers to analyze the economic and technical benefits of energy conservation potential, and to develop technical specifications for DVD/VCD players and copiers, with technical assistance from LBNL. Having built on the success of Phase I, CECP paid great attention to the appraisal of market conditions and the economic and environmental benefits of reducing standby power loss in DVD/VCD players and copiers, and solicited inputs from stakeholders before finalizing the product certification requirements. This paper summarizes the expected energy conservation and environmental benefits due to the implementation of certification programs for DVD/VCD players and copiers in China.« less
Dampers for Natural Draft Heaters: Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lutz, James D.; Biermayer, Peter; King, Derek
2008-10-27
Energy required for water heating accounts for approximately 40percent of national residential natural gas consumption in California. With water heating contributing such a substantial portion of natural gas consumption, it is important to pay attention to water heater efficiencies. This paper reports on an investigation of a patented, buoyancy-operated flue damper. It is an add-on design to a standard atmospherically vented natural-draft gas-fired storage water heater. The flue damper was expected to reduce off-cycle standby losses, which would lead to improvements in the efficiency of the water heater. The test results showed that the Energy Factor of the baseline watermore » heater was 0.576. The recovery efficiency was 0.768. The standby heat loss coefficient was 10.619 (BTU/hr-oF). After the damper was installed, the test results show an Energy Factor for the baseline water heater of 0.605. The recovery efficiency was 0.786. The standby heat loss coefficient was 9.135 (BTU/hr-oF). The recovery efficiency increased 2.3percent and the standby heat loss coefficient decreased 14percent. When the burner was on, the baseline water heater caused 28.0 CFM of air to flow from the room. During standby, the flow was 12.4 CFM. The addition of the damper reduced the flow when the burner was on to 23.5 CFM. During standby, flow with the damper was reduced to 11.1 CFM. The flue damper reduced off-cycle standby losses, and improved the efficiency of the water heater. The flue damper also improved the recovery efficiency of the water heater by restricting on-cycle air flows through the flue.With or without the flue damper, off-cycle air flow upthe stack is nearly half the air flow rate as when the burner is firing.« less
Standby power for railroad-highway grade crossing warning systems
DOT National Transportation Integrated Search
1976-09-30
The requirements for standby power at railroad-highway grade crossings, as established by the states, the Association of American Railroads, and the individual railroads, are described. Standard means of satisfying these requirements, using 115 vac p...
Burri, Haran; Mondouagne Engkolo, Louis Paulin; Dayal, Nicolas; Etemadi, Abdul; Makhlouf, Anne-Marie; Stettler, Carine; Trentaz, Florence
2016-05-01
Manufacturers of implantable cardioverter defibrillators (ICDs) recommend that cell phones be maintained at a distance of ∼15 cm from the implanted device in order to avoid risk of dysfunction due to electromagnetic interference (EMI). Data relating to this issue are outdated and do not reflect modern technology. Our aim was to evaluate whether EMI is still an issue with contemporary ICDs and smartphones. Consecutive patients implanted with a wireless-enabled ICD were tested for potential interference with two models of recent 4G smartphones in conditions intended to maximize risk of EMI. A magnet effect (due to the phone speakers) was tested by placing the smartphones in the standby mode directly over the ICD generator. The presence of EMI artefacts on the real-time electrograms was evaluated by placing the smartphones in the standby, dialling, and operating modes directly over the generator casing and over the parasternal region in the vicinity of the ventricular lead. A total of 63 patients equipped with 29 different models of single, dual, or biventricular ICDs from five major manufacturers were included. None of the patients showed any evidence of interference with the smartphones during any of the 882 tests. The risk of EMI between modern smartphones and contemporary ICDs is low. This is probably due to the filters incorporated in the ICDs and low emission by the phones, as well as the small size of the magnets in the smartphones tested. NCT02330900 (http://www.clinicaltrials.gov). Published on behalf of the European Society of Cardiology. All rights reserved. © The Author 2016. For permissions please email: journals.permissions@oup.com.
White Sands Space Harbor Area 1, Crash/Rescue Standby Support GPS ...
White Sands Space Harbor Area 1, Crash/Rescue Standby Support GPS Buildings, East side of Runway 17/35, approximately 2,650 feet north of intersection with Runway 23/05, White Sands, Dona Ana County, NM
40. OUTLET WORKS: VIBRATION ABSORBER FOR STANDBY UNIT, Sheet H7, ...
40. OUTLET WORKS: VIBRATION ABSORBER FOR STANDBY UNIT, Sheet H-7, September, 1940. File no. SA 342/79. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, Clifford K.; Sims, Cianan
TIM is a real-time interactive concentrating solar field simulation. TIM models a concentrating tower (receiver), heliostat field, and potential reflected glare based on user-specified parameters such as field capacity, tower height and location. TIM provides a navigable 3D interface, allowing the user to “fly” around the field to determine the potential glare hazard from off-target heliostats. Various heliostat aiming strategies are available for specifying how heliostats behave when in standby mode. Strategies include annulus, point-per-group, up-aiming and single-point-focus. Additionally, TIM includes an avian path feature for approximating the irradiance and feather temperature of a bird flying through the field airspace.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Manning. 143.407 Section 143.407 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.407 Manning. Standby vessels must be crewed...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Manning. 143.407 Section 143.407 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.407 Manning. Standby vessels must be crewed...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Manning. 143.407 Section 143.407 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.407 Manning. Standby vessels must be crewed...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Manning. 143.407 Section 143.407 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.407 Manning. Standby vessels must be crewed...
142. STANDBY PRESSURE CONTROL UNIT FOR FUEL AND LIQUID OXYGEN ...
142. STANDBY PRESSURE CONTROL UNIT FOR FUEL AND LIQUID OXYGEN IN SOUTHWEST PORTION OF CONTROL ROOM (214), LSB (BLDG. 751), FACING WEST - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
10 CFR 950.2 - Scope and applicability.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS General Provisions § 950.2 Scope and applicability. This part sets forth the policies and procedures for the award and administration of Standby Support Contracts between the Department and sponsors of new advanced nuclear facilities. ...
Standby power generation under utility curtailment contract agreements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nolan, G.J.; Puccio, V.J.; Calhoun, C.W.
1995-12-31
Many utilities in the US offer large industrial and commercial customers power sales contracts which have attractive rates under a curtailment requirement. This curtailment requirement allows the utility to require the customer to reduce its power demand to a predetermined level within a specific time period. If the required curtailment is not achieved by the customer within the allocated time period, stiff financial penalties are usually enforced by the utility. The attractiveness of the contract rates usually is proportional to the amount of curtailment required. To take advantage of these attractive rates, a customer must be able to withstand themore » curtailment without supplemental generation or must add standby generation to meet its needs. Obviously, the cost of the curtailments to the customer should not exceed the economic benefits of reduced rates. This paper reviews the alternatives faced by a curtailment contract customer together with potential load shedding and standby generation system designs. An example of implementing a curtailment contract at an existing industrial facility is presented. The example facility, Boeing Helicopters of Philadelphia, Pennsylvania required both load shedding and standby generation. The load shedding scheme is fairly complex and is controlled by a programmable logic controller (PLC). The standby generation and load shedding systems for the example facility are examined in detail. Also, lessons learned from implementing the required modifications to the example facility are discussed.« less
Cost effectiveness of a community-based crisis intervention program for people bereaved by suicide.
Comans, Tracy; Visser, Victoria; Scuffham, Paul
2013-01-01
Postvention services aim to ameliorate distress and reduce future incidences of suicide. The StandBy Response Service is one such service operating in Australia for those bereaved through suicide. Few previous studies have reported estimates or evaluations of the economic impact and outcomes associated with the implementation of bereavement/grief interventions. To estimate the cost-effectiveness of a postvention service from a societal perspective. A Markov model was constructed to estimate the health outcomes, quality-adjusted life years, and associated costs such as medical costs and time off work. Data were obtained from a prospective cross-sectional study comparing previous clients of the StandBy service with a control group of people bereaved by suicide who had not had contact with StandBy. Costs and outcomes were measured at 1 year after suicide bereavement and an incremental cost-effectiveness ratio was calculated. The base case found that the StandBy service dominated usual care with a cost saving from providing the StandBy service of AUS $803 and an increase in quality-adjusted life years of 0.02. Probabilistic sensitivity analysis indicates there is an 81% chance the service would be cost-effective given a range of possible scenarios. Postvention services are a cost-effective strategy and may even be cost-saving if all costs to society from suicide are taken into account.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Manning. 143.407 Section 143.407 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OUTER CONTINENTAL SHELF ACTIVITIES DESIGN AND EQUIPMENT Standby Vessels § 143.407 Manning. Standby vessels must be crewed in accordance with their certificate o...
ETR ELECTRICAL BUILDING, TRA648. EMERGENCY STANDBY GENERATOR AND DIESEL UNIT. ...
ETR ELECTRICAL BUILDING, TRA-648. EMERGENCY STANDBY GENERATOR AND DIESEL UNIT. METAL ROOF AND PUMICE BLOCK WALLS. CAMERA FACING SOUTHWEST. INL NEGATIVE NO. 56-3708. R.G. Larsen, Photographer, 11/13/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
North Carolina | Midmarket Solar Policies in the United States | Solar
impose standby charges consistent with approved standby rates applicable to other customer-owned utilities without customer compensation. RECs: Utilities owns renewable energy certificates (RECs), unless customer chooses to net meter under a time of use tariff with demand charges. Meter aggregation: Not
5 CFR 550.707 - Computation of severance pay fund.
Code of Federal Regulations, 2011 CFR
2011-01-01
... pay for standby duty regularly varies throughout the year, compute the average standby duty premium...), compute the weekly average percentage, and multiply that percentage by the weekly scheduled rate of pay in... hours in a pay status (excluding overtime hours) and multiply that average by the hourly rate of basic...
A Framework For Fault Tolerance In Virtualized Servers
2016-06-01
effects into the system. Decrease in performance, the expansion in the total system size and weight, and a hike in the system cost can be counted in... benefit also shines out in terms of reliability. 41 4. How Data Guard Synchronizes Standby Databases Primary and standby databases in Oracle Data
A reliable ground bounce noise reduction technique for nanoscale CMOS circuits
NASA Astrophysics Data System (ADS)
Sharma, Vijay Kumar; Pattanaik, Manisha
2015-11-01
Power gating is the most effective method to reduce the standby leakage power by adding header/footer high-VTH sleep transistors between actual and virtual power/ground rails. When a power gating circuit transitions from sleep mode to active mode, a large instantaneous charge current flows through the sleep transistors. Ground bounce noise (GBN) is the high voltage fluctuation on real ground rail during sleep mode to active mode transitions of power gating circuits. GBN disturbs the logic states of internal nodes of circuits. A novel and reliable power gating structure is proposed in this article to reduce the problem of GBN. The proposed structure contains low-VTH transistors in place of high-VTH footer. The proposed power gating structure not only reduces the GBN but also improves other performance metrics. A large mitigation of leakage power in both modes eliminates the need of high-VTH transistors. A comprehensive and comparative evaluation of proposed technique is presented in this article for a chain of 5-CMOS inverters. The simulation results are compared to other well-known GBN reduction circuit techniques at 22 nm predictive technology model (PTM) bulk CMOS model using HSPICE tool. Robustness against process, voltage and temperature (PVT) variations is estimated through Monte-Carlo simulations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... LETTERS OF CREDIT § 960.1 Definitions. As used in this part: Applicant means a person or entity at whose request or for whose account a standby letter of credit is issued. Beneficiary means a person or entity who, under the terms of a standby letter of credit, is entitled to have its complying presentation...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... portable generators, home stand-by generators and pressure washers. New findings show that worker... portable generators, home stand-by generators and pressure washers. The amended notice applicable to TA-W... 1974, as amended. Signed in Washington, DC, this 22nd day of February 2010. Elliott S. Kushner...
21. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...
21. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT DISC STORAGE SYSTEMS A AND B (A OR B ARE REDUNDANT SYSTEMS), ONE MAINFRAME COMPUTER ON LINE, ONE ON STANDBY WITH STORAGE TAPE, ONE ON STANDBY WITHOUT TAPE INSTALLED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
31 CFR 535.568 - Certain standby letters of credit and performance bonds.
Code of Federal Regulations, 2010 CFR
2010-07-01
... credit and performance bonds. (a) Notwithstanding any other provision of law, payment into a blocked... demand for payment under a standby letter of credit, it shall promptly notify the person for whose... blocked account and reimbursement therefor by the account party. (c) Where there is outstanding a demand...
12 CFR 614.4810 - Standby letters of credit.
Code of Federal Regulations, 2010 CFR
2010-01-01
... party in the performance of an obligation. (b) As a matter of sound banking practice, banks for... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Standby letters of credit. 614.4810 Section 614.4810 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM LOAN POLICIES AND OPERATIONS Banks...
Olivar Castrillón, C; González Morán, S; Martínez Suárez, M M
1999-10-15
To determine the level of work satisfaction and professional wear and tear among primary care doctors, and related factors. Crossover descriptive study. Asturias PC. General doctors (GD), family doctors (FD), residents, and PC paediatricians (n = 810). A survey for self-administration with social and demographic variables and suggestions. The Font Roja-PC questionnaire (FR). The Maslach Burnout Inventory (MBI). 497 (55.6% male) responded (61.35%). Mean age was 41 (SD = 7.18) 57.3% worked in an urban environment. 42% were FD, 35% GD, 15% paediatricians, 7% residents. The PC model was: 84% PC teams, 9% traditional model, 7% normal emergency service (NES). Mean seniority was 14 years (SD = 7.5). 89% worked solely in PC. 59% had a permanent contract, 31% provisional contracts, 7% were residents and 3% temporary. Overall mean satisfaction (OMS): 73.73 points. 43% had high professional wear and tear, 23% moderate and 32% low. Statistically significant associations: OMS/social and demographic variables: greater in men, the rural environment, paediatrics, NES, without stand-by, with less bureaucracy and less case pressure. Satisfaction/FR: greater NES, without stand-by, without sole dedication. Case pressure/FR: greater in men, rural environment, paediatrics, without sole dedication, NES, without stand-by and with less demand. Control/FR: greater in permanent and provisional posts. Relationship/FR: greater in men, FD, without stand-by. Suitability/FR: greater in men, paediatricians, permanent doctors, without stand-by. Relaxation/FR: greater in residents, young people, without sole dedication, NES. Variety/FR: greater in young people, those without children, residents, with sole dedication, those with stand-by. MBI/social and demographic variables: greater level of low emotional tiredness in workers in a rural environment and those with children. Greater low level of alienation in women. The older the doctor, the less the professional burnout. 1. High level of work satisfaction. 2. High-moderate professional wear and tear.
NASA Technical Reports Server (NTRS)
1997-01-01
Through a Small Business Innovation Research (SBIR) contract from Kennedy Space Center, General Pneumatics Corporation's Western Research Center satisfied a NASA need for a non-clogging Joule-Thomson cryostat to provide very low temperature cooling for various sensors. This NASA-supported cryostat development played a key part in the development of more portable high-purity geranium gamma-ray detectors. Such are necessary to discern between the radionuclides in medical, fuel, weapon, and waste materials. The outcome of the SBIR project is a cryostat that can cool gamma-ray detectors, without vibration, using compressed gas that can be stored compactly and indefinitely in a standby mode. General Pneumatics also produces custom J-T cryostats for other government, commercial and medical applications.
Research on performance requirements of turbofan engine used on carrier-based UAV
NASA Astrophysics Data System (ADS)
Zhao, Shufan; Li, Benwei; Zhang, Wenlong; Wu, Heng; Feng, Tang
2017-05-01
According to the mission requirements of the carrier-based unmanned aerial vehicle (UAV), a mode level flight was established to calculate the thrust requirements from altitude 9 km to 13 km. Then, the estimation method of flight profile was used to calculate the weight of UAV in each stage to get the specific fuel consumption requirements of the UAV in standby stage. The turbofan engine of carrier-based UAV should meet the thrust and specific fuel consumption requirements. Finally, the GSP software was used to verify the simulation of a small high-bypass turbofan engine. The conclusion is useful for the turbofan engine selection of carrier-based UAV.
20 CFR 332.7 - Consideration of evidence.
Code of Federal Regulations, 2010 CFR
2010-04-01
... INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.7 Consideration of evidence... as to lay-over or stand-by status as may be necessary for the determination of his claim. An employee's statement in connection with his claim that he was not out of service because of a lay-over or...
Mortazavi, S M J; Rouintan, M S; Taeb, S; Dehghan, N; Ghaffarpanah, A A; Sadeghi, Z; Ghafouri, F
2012-06-01
The worldwide dramatic increase in mobile phone use has generated great concerns about the detrimental effects of microwave radiations emitted by these communication devices. Reaction time plays a critical role in performing tasks necessary to avoid hazards. As far as we know, this study is the first survey that reports decreased reaction time after exposure to electromagnetic fields generated by a high specific absorption rate mobile phone. It is also the first study in which previous history of mobile phone use is taken into account. The aim of this study was to assess both the acute and chronic effects of electromagnetic fields emitted by mobile phones on reaction time in university students. Visual reaction time (VRT) of young university students was recorded with a simple blind computer-assisted-VRT test, before and after a 10 min real/sham exposure to electromagnetic fields of mobile phones. Participants were 160 right-handed university students aged 18-31. To assess the effect of chronic exposures, the reaction time in sham-exposed phases were compared among low level, moderate and frequent users of mobile phones. The mean ± SD reaction time after real exposure and sham exposure were 286.78 ± 31.35 ms and 295.86 ± 32.17 ms (P < 0.001), respectively. The age of students did not significantly alter the reaction time either in talk or in standby mode. The reaction time either in talk or in standby mode was shorter in male students. The students' VRT was significantly affected by exposure to electromagnetic fields emitted by a mobile phone. It can be concluded that these exposures cause decreased reaction time, which may lead to a better response to different hazards. In this light, this phenomenon might decrease the chances of human errors and fatal accidents.
Electronics design of a multi-rate DPSK modem for free-space optical communications
NASA Astrophysics Data System (ADS)
Rao, H. G.; Browne, C. A.; Caplan, D. O.; Carney, J. J.; Chavez, M. L.; Fletcher, A. S.; Fitzgerald, J. J.; Kaminsky, R. D.; Lund, G.; Hamilton, S. A.; Magliocco, R. J.; Mikulina, O. V.; Murphy, R. J.; Seaver, M. M.; Scheinbart, M. S.; Spellmeyer, N. W.; Wang, J. P.
2014-03-01
We have designed and experimentally demonstrated a radiation-hardened modem suitable for NASA's Laser Communications Relay Demonstration. The modem supports free-space DPSK communication over a wide range of channel rates, from 72 Mb/s up to 2.88 Gb/s. The modem transmitter electronics generate a bursty DPSK waveform, such that only one optical modulator is required. The receiver clock recovery is capable of operating over all channel rates at average optical signal levels below -70 dBm. The modem incorporates a radiation-hardened Xilinx Virtex 5 FPGA and a radiation-hardened Aeroflex UT699 CPU. The design leverages unique capabilities of each device, such as the FPGA's multi-gigabit transceivers. The modem scrubs itself against radiation events, but does not require pervasive triple-mode redundant logic. The modem electronics include automatic stabilization functions for its optical components, and software to control its initialization and operation. The design allows the modem to be put into a low-power standby mode.
"Think positively": Parkinson's disease, biomedicine, and hope in contemporary Germany.
Metzler, Ingrid; Just, Paul
2017-06-01
Narratives of hope shape contemporary engagements with Parkinson's disease. On the one hand, a "biomedical narrative of hope" promises that biomedical research will help to transform this treatable but incurable disease into a curable one in the future. On the other hand, a more individual "illness narrative of hope" encourages patients to influence the course of Parkinson's disease by practicing self-care and positive thinking. This article asks how these two narratives of hope interact. It bases its argument on an analysis of data from 13 focus groups conducted in Germany in 2012 and 2014 with patients with Parkinson's disease and their relatives. Participants were asked to have their say on clinical trials for advanced therapies for Parkinson's disease and, while doing so, envisioned their biosocial selves in the present and the future. Three "modes of being" for patients were drawn from this body of data: a "users on stand-by" mode, an "unengaged" mode, and an "experimental pioneers" mode. Both narratives of hope were important to all three modes, yet they were mobilized at different frequencies and also had different statuses. While the biomedical narrative of hope was deemed an important "dream of the future" that participants passively supported without having to make it their own, the illness narrative of hope was a truth discourse that took an imperative form: having Parkinson's disease implied the need to maintain a positive attitude.
Improving magnetic properties of MgB2 bulk superconductors by synthetic engine oil treatment
NASA Astrophysics Data System (ADS)
Taylan Koparan, E.; Savaskan, B.; Yanmaz, E.
2016-08-01
The present study focuses on the effects of standby time of the MgB2 samples immersed in synthetic engine oil on the critical current density (Jc(H)), magnetic field dependence of the pinning force density fp(b) and Tc performances of MgB2 bulk superconductors. Synthetic engine oil was used as a product which is cheap and a rich carbon source. Manufactured MgB2 pellet samples were immersed at different standby time of 30 min, 120 min, 300 min and 1440 min in synthetic engine oil after the first heating process. Finally, MgB2 samples immersed in synthetic engine oil were sintered at 1000 °C and kept for 15 min in Ar atmosphere. The critical current density of all of MgB2 samples immersed at different standby time in engine oil in whole field range was better than that of the pure MgB2 sample because of the number of the pinning centers. The MgB2 sample immersed at 300 min standby time in synthetic engine oil has the best performance compared to other samples. The Jc value for the pure sample is 2.0 × 103 A/cm2, whereas for the MgB2 sample immersed at 300 min standby time in engine oil the Jc is enhanced to 4.8 × 103A/cm2 at 5 K and 3 T. The superconducting transition temperature (Tc) did not change with the increasing standby time of the samples in synthetic engine oil at all. The best diamagnetic property was obtained from the sample which kept in synthetic engine oil for 300 min. Synthetic engine oil treatment results in remarkable improvement of the critical current density and pinning force performances of MgB2 superconductors. It was found that all MgB2 samples have a different pinning property at different measuring temperatures. Using synthetic engine oil as a product which is cheap and a rich carbon source in MgB2 bulk superconductors makes MgB2 samples immersed in synthetic engine oil a good candidate for industrial applications.
Dynamic SVL and body bias for low leakage power and high performance in CMOS digital circuits
NASA Astrophysics Data System (ADS)
Deshmukh, Jyoti; Khare, Kavita
2012-12-01
In this article, a new complementary metal oxide semiconductor design scheme called dynamic self-controllable voltage level (DSVL) is proposed. In the proposed scheme, leakage power is controlled by dynamically disconnecting supply to inactive blocks and adjusting body bias to further limit leakage and to maintain performance. Leakage power measurements at 1.8 V, 75°C demonstrate power reduction by 59.4% in case of 1 bit full adder and by 43.0% in case of a chain of four inverters using SVL circuit as a power switch. Furthermore, we achieve leakage power reduction by 94.7% in case of 1 bit full adder and by 91.8% in case of a chain of four inverters using dynamic body bias. The forward body bias of 0.45 V applied in active mode improves the maximum operating frequency by 16% in case of 1 bit full adder and 5.55% in case of a chain of inverters. Analysis shows that additional benefits of using the DSVL and body bias include high performance, low leakage power consumption in sleep mode, single threshold implementation and state retention even in standby mode.
Sánchez, Antonio; Blanc, Sara; Yuste, Pedro; Perles, Angel; Serrano, Juan José
2012-01-01
This paper is focused on the description of the physical layer of a new acoustic modem called ITACA. The modem architecture includes as a major novelty an ultra-low power asynchronous wake-up system implementation for underwater acoustic transmission that is based on a low-cost off-the-shelf RFID peripheral integrated circuit. This feature enables a reduced power dissipation of 10 μW in stand-by mode and registers very low power values during reception and transmission. The modem also incorporates clear channel assessment (CCA) to support CSMA-based medium access control (MAC) layer protocols. The design is part of a compact platform for a long-life short/medium range underwater wireless sensor network. PMID:22969324
Sánchez, Antonio; Blanc, Sara; Yuste, Pedro; Perles, Angel; Serrano, Juan José
2012-01-01
This paper is focused on the description of the physical layer of a new acoustic modem called ITACA. The modem architecture includes as a major novelty an ultra-low power asynchronous wake-up system implementation for underwater acoustic transmission that is based on a low-cost off-the-shelf RFID peripheral integrated circuit. This feature enables a reduced power dissipation of 10 μW in stand-by mode and registers very low power values during reception and transmission. The modem also incorporates clear channel assessment (CCA) to support CSMA-based medium access control (MAC) layer protocols. The design is part of a compact platform for a long-life short/medium range underwater wireless sensor network.
Evaluation of glare at the Ivanpah Solar Electric Generating System
Ho, C. K.; Sims, C. A.; Christian, J. M.
2015-06-05
The Ivanpah Solar Electric Generating System (ISEGS), located on I-15 about 40 miles (60 km) south of Las Vegas, NV, consists of three power towers 459 ft (140 m) tall and over 170,000 reflective heliostats with a rated capacity of 390 MW. In addition, reports of glare from the plant have been submitted by pilots and air traffic controllers and recorded by the Aviation Safety Reporting System and the California Energy Commission since 2013. Aerial and ground-based surveys of the glare were conducted in April, 2014, to identify the cause and to quantify the irradiance and potential ocular impacts ofmore » the glare. Results showed that the intense glare viewed from the airspace above ISEGS was caused by heliostats in standby mode that were aimed to the side of the receiver. Evaluation of the glare showed that the retinal irradiance and subtended source angle of the glare from the heliostats in standby were sufficient to cause significant ocular impact (potential for after-image) up to a distance of ~6 miles (10 km), but the values were below the threshold for permanent eye damage. Glare from the receivers had a low potential for after-image at all ground-based monitoring locations outside of the site boundaries. A Letter to Airmen has been issued by the Federal Aviation Administration to notify pilots of the potential glare hazards. Additional measures to mitigate the potential impacts of glare from ISGES are also presented and discussed.« less
STANDBY TOP AND BOTTOM ROTARY MILLING CUTTERS FOR TORIN LINE. ...
STANDBY TOP AND BOTTOM ROTARY MILLING CUTTERS FOR TORIN LINE. SOME PRODUCT FROM THE #43 HOT ROLL IS PROCESSED ON THE TORIN LINE TO REMOVE OXIDIZED SURFACE MATERIAL. IN PRACTICE 15-20/1000 IS CUT FROM THE UPPER AND LOWER SURFACES OF THE STRIP AND RECYCLED TO THE CASTING SHOP. TORIN LINE ADDED AS PART OF 1981 EXPANSION PROGRAM. - American Brass Foundry, 70 Sayre Street, Buffalo, Erie County, NY
Ayub, Khurram; Corrigan, Ruth A; Misra, Jyoti; Galitzine, Svetlana
2018-01-01
Persons with paraplegia present complex challenges to anaesthetists. Complications experienced by these patients can require major orthoplastic surgery such as excision of infected bone and soft tissue due to pressure sores and soft tissue reconstruction. Anaesthetic strategies deemed both safe and acceptable to this population are essential. We report a case series of five procedures in four patients with complete chronic spinal cord injury (CSCI) who underwent operations in lateral position under standby anaesthesia and audio-visual distraction (AVD) with minimal sedation. Patients' experience was formally assessed as part of the ongoing AVD service evaluation in our institution. All stated that they were not concerned in the operating theatre and felt "comfortable" or "very comfortable" throughout. All patients rated the experience as "better" than their previous experience with general anaesthesia and felt "very satisfied" with their anaesthetic. Importantly, all patients would recommend sedation with AVD to other patients. To our knowledge, this is the first report of AVD application as an adjunct to standby anaesthesia during major surgery in persons with paraplegia. Patient feedback was extremely positive, therefore it is likely that by making standby anaesthesia more acceptable to patients the use of AVD could reduce anaesthetic risk in this complex patient group.
Code of Federal Regulations, 2011 CFR
2011-07-01
... structure (e.g., dike or trench), a drainage control system, or a diversion structure (e.g., standby tank... this inflow (e.g., waste feed cutoff system or by-pass system to a stand-by tank). Note: These systems are intended to be used in the event of a leak or overflow from the tank due to a system failure (e.g...
Code of Federal Regulations, 2014 CFR
2014-07-01
... structure (e.g., dike or trench), a drainage control system, or a diversion structure (e.g., standby tank... this inflow (e.g., waste feed cutoff system or by-pass system to a stand-by tank). Note: These systems are intended to be used in the event of a leak or overflow from the tank due to a system failure (e.g...
Code of Federal Regulations, 2013 CFR
2013-07-01
... structure (e.g., dike or trench), a drainage control system, or a diversion structure (e.g., standby tank... this inflow (e.g., waste feed cutoff system or by-pass system to a stand-by tank). Note: These systems are intended to be used in the event of a leak or overflow from the tank due to a system failure (e.g...
Code of Federal Regulations, 2012 CFR
2012-07-01
... structure (e.g., dike or trench), a drainage control system, or a diversion structure (e.g., standby tank... this inflow (e.g., waste feed cutoff system or by-pass system to a stand-by tank). Note: These systems are intended to be used in the event of a leak or overflow from the tank due to a system failure (e.g...
Final Environmental Statement. Continental United States Over-the- Horizon Backscatter Radar System
1975-01-01
plants will be provided only for the operational radar system. When operating they will emit diesel exhaust fumes into the atmosphere. g. Noise...Pollution. Noise will be generated when the standby power plants are used. h. Foliage and Soil. The clearing of trees and shrubs in the...building, a 12 megawatt standby power plant , a gate house, transmit antennas, connection to commercial power lines, a paved access road, a well water
1989-02-01
INDICATOR pPOST-FILTERED VITER RPUESIC POST-FILTRATION POLYMER SOLUTION MCUUM BREAKER FILTRATION POLYMER D*+RENTALkL PRESSURE SWITCH FEED PUMPS POLYMER...differential pressure switch signals the need for backwash of the operating filter. At this time, flow is S automatically switched to the standby filter...filter is undergoing backwash or on standby. High differential pressure across the filter bed, as sensed by a differential pressure switch , signals
Fault tolerance in a supercomputer through dynamic repartitioning
Chen, Dong; Coteus, Paul W.; Gara, Alan G.; Takken, Todd E.
2007-02-27
A multiprocessor, parallel computer is made tolerant to hardware failures by providing extra groups of redundant standby processors and by designing the system so that these extra groups of processors can be swapped with any group which experiences a hardware failure. This swapping can be under software control, thereby permitting the entire computer to sustain a hardware failure but, after swapping in the standby processors, to still appear to software as a pristine, fully functioning system.
Actuator stiction compensation via variable amplitude pulses.
Arifin, B M S; Munaro, C J; Angarita, O F B; Cypriano, M V G; Shah, S L
2018-02-01
A novel model free stiction compensation scheme is developed which eliminates the oscillations and also reduces valve movement, allowing good setpoint tracking and disturbance rejection. Pulses with varying amplitude are added to the controller output to overcome stiction and when the error becomes smaller than a specified limit, the compensation ceases and remains in a standby mode. The compensation re-starts as soon as the error exceeds the user specified threshold. The ability to cope with uncertainty in friction is a feature achieved by the use of pulses of varying amplitude. The algorithm has been evaluated via simulation and by application on an industrial DCS system interfaced to a pilot scale process with features identical to those found in industry including a valve positioner. Copyright © 2018 ISA. Published by Elsevier Ltd. All rights reserved.
Energy 101: Energy Efficient Data Centers
None
2018-04-16
Data centers provide mission-critical computing functions vital to the daily operation of top U.S. economic, scientific, and technological organizations. These data centers consume large amounts of energy to run and maintain their computer systems, servers, and associated high-performance componentsâup to 3% of all U.S. electricity powers data centers. And as more information comes online, data centers will consume even more energy. Data centers can become more energy efficient by incorporating features like power-saving "stand-by" modes, energy monitoring software, and efficient cooling systems instead of energy-intensive air conditioners. These and other efficiency improvements to data centers can produce significant energy savings, reduce the load on the electric grid, and help protect the nation by increasing the reliability of critical computer operations.
On-Demand Sensor Node Wake-Up Using Solar Panels and Visible Light Communication
Carrascal, Carolina; Demirkol, Ilker; Paradells, Josep
2016-01-01
To significantly reduce, or eliminate completely, the energy waste caused by the standby (idle) mode of wireless sensor nodes, we propose a novel on-demand wake-up system, which allows the nodes to be put into sleep mode unless their activation is truly necessary. Although there have been many studies proposing RF-based wake-up radio systems, in this work, we develop the first visible light communication (VLC)-based wake-up system. The developed system can extend the existing VLC systems and can be exploited to derive new application areas such as VLC tags. The system uses an off-the-shell indoor solar panel as receptor device of the wake-up signal as well as for energy harvesting purposes, through which it is able to harvest enough energy for its autonomous work. The design, implementation details and the experimental evaluation results are presented, which include flickering characterization and wake-up range evaluations. The results show that the developed system achieve reasonable wake-up distances for indoor environments, mainly where the use of VLC systems are considered. PMID:27011190
The electromagnetic interference of mobile phones on the function of a γ-camera.
Javadi, Hamid; Azizmohammadi, Zahra; Mahmoud Pashazadeh, Ali; Neshandar Asli, Isa; Moazzeni, Taleb; Baharfar, Nastaran; Shafiei, Babak; Nabipour, Iraj; Assadi, Majid
2014-03-01
The aim of the present study is to evaluate whether or not the electromagnetic field generated by mobile phones interferes with the function of a SPECT γ-camera during data acquisition. We tested the effects of 7 models of mobile phones on 1 SPECT γ-camera. The mobile phones were tested when making a call, in ringing mode, and in standby mode. The γ-camera function was assessed during data acquisition from a planar source and a point source of Tc with activities of 10 mCi and 3 mCi, respectively. A significant visual decrease in count number was considered to be electromagnetic interference (EMI). The percentage of induced EMI with the γ-camera per mobile phone was in the range of 0% to 100%. The incidence of EMI was mainly observed in the first seconds of ringing and then mitigated in the following frames. Mobile phones are portable sources of electromagnetic radiation, and there is interference potential with the function of SPECT γ-cameras leading to adverse effects on the quality of the acquired images.
On-Demand Sensor Node Wake-Up Using Solar Panels and Visible Light Communication.
Carrascal, Carolina; Demirkol, Ilker; Paradells, Josep
2016-03-22
To significantly reduce, or eliminate completely, the energy waste caused by the standby (idle) mode of wireless sensor nodes, we propose a novel on-demand wake-up system, which allows the nodes to be put into sleep mode unless their activation is truly necessary. Although there have been many studies proposing RF-based wake-up radio systems, in this work, we develop the first visible light communication (VLC)-based wake-up system. The developed system can extend the existing VLC systems and can be exploited to derive new application areas such as VLC tags. The system uses an off-the-shell indoor solar panel as receptor device of the wake-up signal as well as for energy harvesting purposes, through which it is able to harvest enough energy for its autonomous work. The design, implementation details and the experimental evaluation results are presented, which include flickering characterization and wake-up range evaluations. The results show that the developed system achieve reasonable wake-up distances for indoor environments, mainly where the use of VLC systems are considered.
a High-Level Technique for Estimation and Optimization of Leakage Power for Full Adder
NASA Astrophysics Data System (ADS)
Shrivas, Jayram; Akashe, Shyam; Tiwari, Nitesh
2013-06-01
Optimization of power is a very important issue in low-voltage and low-power application. In this paper, we have proposed power gating technique to reduce leakage current and leakage power of one-bit full adder. In this power gating technique, we use two sleep transistors i.e., PMOS and NMOS. PMOS sleep transistor is inserted between power supply and pull up network. And NMOS sleep transistor is inserted between pull down network and ground terminal. These sleep transistors (PMOS and NMOS) are turned on when the circuit is working in active mode. And sleep transistors (PMOS and NMOS) are turned off when circuit is working in standby mode. We have simulated one-bit full adder and compared with the power gating technique using cadence virtuoso tool in 45 nm technology at 0.7 V at 27°C. By applying this technique, we have reduced leakage current from 2.935 pA to 1.905 pA and leakage power from 25.04μw to 9.233μw. By using this technique, we have reduced leakage power up to 63.12%.
Control Software for Advanced Video Guidance Sensor
NASA Technical Reports Server (NTRS)
Howard, Richard T.; Book, Michael L.; Bryan, Thomas C.
2006-01-01
Embedded software has been developed specifically for controlling an Advanced Video Guidance Sensor (AVGS). A Video Guidance Sensor is an optoelectronic system that provides guidance for automated docking of two vehicles. Such a system includes pulsed laser diodes and a video camera, the output of which is digitized. From the positions of digitized target images and known geometric relationships, the relative position and orientation of the vehicles are computed. The present software consists of two subprograms running in two processors that are parts of the AVGS. The subprogram in the first processor receives commands from an external source, checks the commands for correctness, performs commanded non-image-data-processing control functions, and sends image data processing parts of commands to the second processor. The subprogram in the second processor processes image data as commanded. Upon power-up, the software performs basic tests of functionality, then effects a transition to a standby mode. When a command is received, the software goes into one of several operational modes (e.g. acquisition or tracking). The software then returns, to the external source, the data appropriate to the command.
Voumard, Rachel; Berthod, Delphine; Rambaud-Althaus, Clotilde; D'Acremont, Valérie; Genton, Blaise
2015-04-01
The considerable malaria decline in several countries challenges the strategy of chemoprophylaxis for travellers visiting moderate- to low-risk areas. An international consensus on the best strategy is lacking. It is essential to include travellers' opinions in the decision process. The preference of travellers regarding malaria prevention for moderate- to low-risk areas, related to their risk perception, as well as the reasons for their choices were investigated. Prior to pre-travel consultation in the Travel Clinic, a self-administered questionnaire was given to travellers visiting moderate- to low-risk malaria areas. Four preventive options were proposed to the traveller, i.e., bite prevention only, chemoprophylaxis, stand-by emergency treatment alone, and stand-by emergency treatment with rapid diagnostic test. The information was accompanied by a risk scale for incidence of malaria, anti-malarial adverse drug reactions and other travel-related risks, inspired by Paling palettes from the Risk Communication Institute. A total of 391 travellers were included from December 2012 to December 2013. Fifty-nine (15%) opted for chemoprophylaxis, 116 (30%) for stand-by emergency treatment, 112 (29%) for stand-by emergency treatment with rapid diagnostic test, 100 (26%) for bite prevention only, and four (1%) for other choices. Travellers choosing chemoprophylaxis justified their choice for security reasons (42%), better preventive action (29%), higher efficacy (15%) and easiness (15%). The reasons for choosing stand-by treatment or bite prevention only were less medication consumed (29%), less adverse drug reactions (23%) and lower price (9%). Those who chose chemoprophylaxis were more likely to have used it in the past (OR = 3.0 (CI 1.7-5.44)), but were not different in terms of demographic, travel characteristics or risk behaviour. When travelling to moderate- to low-risk malaria areas, 85% of interviewees chose not to take chemoprophylaxis as malaria prevention, although most guidelines recommend it. They had coherent reasons for their choice. New recommendations should include shared decision-making to take into account travellers' preferences.
Evaluation of Glare at the Ivanpah Solar Electric Generating System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, Clifford K.; Sims, Cianan; Christian, Joshua Mark
2014-07-01
The Ivanpah Solar Electric Generating System (ISEGS), located on I - 15 about 40 miles (60 km) south of Las Vegas, NV, consists of three power towers 459 ft (140 m) tall and over 170,000 reflective heliostats with a rated capacity of 390 MW. Reports of glare from the plant have been submitted by pilots and air traffic controllers and recorded by the Aviation Safety Reporting System and the California Energy Commission since 2013. Aerial and ground - based surveys of the glare were conducted in April, 2014, to identify the cause and to quantify the irradiance and potential ocularmore » impact s of the glare . Results showed that the intense glare viewed from the airspace above ISEGS was caused by he liostats in standby mode that were aimed to the side of the receiver. Evaluation of the glare showed that the retinal irradiance and subtended source angle of the glare from the heliostats in standby were sufficient to cause significant ocular impact (pot ential for after - image) up to a distance of %7E6 miles (10 km), but the values were below the threshold for permanent eye damage . Glare from the receivers had a low potential for after - image at all ground - based monitoring locations outside of the site bound aries. A Letter to Airmen has been issued by the Federal Aviation Administration to notify pilots of the potential glare hazards. Additional measures to mitigate the potential impacts of glare from ISGES are also presented and discussed. This page intentionally left blank« less
IEEE-802.15.4-based low-power body sensor node with RF energy harvester.
Tran, Thang Viet; Chung, Wan-Young
2014-01-01
This paper proposes the design and implementation of a low-voltage and low-power body sensor node based on the IEEE 802.15.4 standard to collect electrocardiography (ECG) and photoplethysmography (PPG) signals. To achieve compact size, low supply voltage, and low power consumption, the proposed platform is integrated into a ZigBee mote, which contains a DC-DC booster, a PPG sensor interface module, and an ECG front-end circuit that has ultra-low current consumption. The input voltage of the proposed node is very low and has a wide range, from 0.65 V to 3.3 V. An RF energy harvester is also designed to charge the battery during the working mode or standby mode of the node. The power consumption of the proposed node reaches 14 mW in working mode to prolong the battery lifetime. The software is supported by the nesC language under the TinyOS environment, which enables the proposed node to be easily configured to function as an individual health monitoring node or a node in a wireless body sensor network (BSN). The proposed node is used to set up a wireless BSN that can simultaneously collect ECG and PPG signals and monitor the results on the personal computer.
2017-06-09
S) Major Augustin Hodali 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...support of many individuals and organizations . First, I am whole-heartedly thankful to the Rwandan Government and particularly the Rwanda Defense Forces...African Standby Force AU African Union DRC Democratic Republic of the Congo MONUSCO United Nations Organization Stabilization Mission in the Democratic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wendelin, Timothy J; Ho, Clifford K.; Horstman, Luke
This paper presents a study of alternative heliostat standby aiming strategies and their impact on avian flux hazards and operational performance of a concentrating solar power plant. A mathematical model was developed that predicts the bird-feather temperature as a function of solar irradiance, thermal emittance, convection, and thermal properties of the feather. The irradiance distribution in the airspace above the Ivanpah Unit 2 heliostat field was simulated using a ray-trace model for two different times of the day, four days of the year, and nine different standby aiming strategies. The impact of the alternative aiming strategies on operational performance wasmore » assessed by comparing the heliostat slew times from standby position to the receiver for the different aiming strategies. Increased slew times increased a proxy start-up time that reduced the simulated annual energy production. Results showed that spreading the radial aim points around the receiver to a distance of ~150 m or greater reduced the hazardous exposure times that the feather temperature exceeded the hazard metric of 160 degrees C. The hazardous exposure times were reduced by ~23% and 90% at a radial spread of aim points extending to 150 m and 250 m, respectively, but the simulated annual energy production decreased as a result of increased slew times. Single point-focus aiming strategies were also evaluated, but these strategies increased the exposure hazard relative to other aiming strategies.« less
NASA Astrophysics Data System (ADS)
Liu, Yiming; Shi, Yimin; Bai, Xuchao; Zhan, Pei
2018-01-01
In this paper, we study the estimation for the reliability of a multicomponent system, named N- M-cold-standby redundancy system, based on progressive Type-II censoring sample. In the system, there are N subsystems consisting of M statistically independent distributed strength components, and only one of these subsystems works under the impact of stresses at a time and the others remain as standbys. Whenever the working subsystem fails, one from the standbys takes its place. The system fails when the entire subsystems fail. It is supposed that the underlying distributions of random strength and stress both belong to the generalized half-logistic distribution with different shape parameter. The reliability of the system is estimated by using both classical and Bayesian statistical inference. Uniformly minimum variance unbiased estimator and maximum likelihood estimator for the reliability of the system are derived. Under squared error loss function, the exact expression of the Bayes estimator for the reliability of the system is developed by using the Gauss hypergeometric function. The asymptotic confidence interval and corresponding coverage probabilities are derived based on both the Fisher and the observed information matrices. The approximate highest probability density credible interval is constructed by using Monte Carlo method. Monte Carlo simulations are performed to compare the performances of the proposed reliability estimators. A real data set is also analyzed for an illustration of the findings.
A comparative approach to the principal mechanisms of different memory systems
NASA Astrophysics Data System (ADS)
Rensing, Ludger; Koch, Michael; Becker, Annette
2009-12-01
The term “memory” applies not only to the preservation of information in neuronal and immune systems but also to phenomena observed for example in plants, single cells, and RNA viruses. We here compare the different forms of information storage with respect to possible common features. The latter may be characterized by (1) selection of pre-existing information, (2) activation of memory systems often including transcriptional, and translational, as well as epigenetic and genetic mechanisms, (3) subsequent consolidation of the activated state in a latent form ( standby mode), and (4) reactivation of the latent state of memory systems when the organism is exposed to the same (or conditioned) signal or to previous selective constraints. These features apparently also exist in the “evolutionary memory,” i.e., in evolving populations which have highly variable mutant spectra.
Development status of a preprototype water electrolysis subsystem
NASA Technical Reports Server (NTRS)
Martin, R. B.; Erickson, A. C.
1981-01-01
A preprototype water electrolysis subsystem was designed and fabricated for NASA's advanced regenerative life support program. A solid polymer is used for the cell electrolyte. The electrolysis module has 12 cells that can generate 5.5 kg/day of oxygen for the metabolic requirements of three crewmembers, for cabin leakage, and for the oxygen and hydrogen required for carbon dioxide collection and reduction processes. The subsystem can be operated at a pressure between 276 and 2760 kN/sq m and in a continuous constant-current, cyclic, or standby mode. A microprocessor is used to aid in operating the subsystem. Sensors and controls provide fault detection and automatic shutdown. The results of development, demonstration, and parametric testing are presented. Modifications to enhance operation in an integrated and manned test are described. Prospective improvements for the electrolysis subsystem are discussed.
NASA Astrophysics Data System (ADS)
Risteiu, M.; Dobra, R.; Andras, I.; Roventa, M.; Lorincz, A.
2017-06-01
The paper shows the results of a lab model for strain gauges based measuring system for multiple measuring heads of the mechanical stress in lattice structures of the bucket wheel excavator for open pit mines-harsh environment. The system is designed around a microcontroller system. Because of specific working conditions, the measuring system sends data to a processing system (a PC with Matlab software), we have implemented a secure communication solution based on ISM standard, by using NRF24L01 module. The transceiver contains a fully integrated frequency synthesizer based on crystal oscillator, and a Enhanced ShockBurst™ protocol engine. The proposed solution has a current consumption around 9.0 mA at an output power of -6dBm and 12.3mA in RX mode. Built-in Power Down and Standby modes makes power saving easily realizable for our solution battery powered. The stress from structures is taken by specific strain gauges adapted to low frequency vibrations. We are using a precision 24-bit analog-to-digital converter (ADC) designed for weigh scales and industrial control applications to interface directly with a bridge sensor-instrumentation device, with low drift voltage, low noise, common mode rejection signal, frequency and temperature stability. As backup implementation for measurements a high speed storage implementation is used.
NASA Astrophysics Data System (ADS)
Hou, Ligang; Luo, Rengui; Wu, Wuchen
2006-11-01
This paper forwards a low power grating detection chip (EYAS) on length and angle precision measurement. Traditional grating detection method, such as resister chain divide or phase locked divide circuit are difficult to design and tune. The need of an additional CPU for control and display makes these methods' implementation more complex and costly. Traditional methods also suffer low sampling speed for the complex divide circuit scheme and CPU software compensation. EYAS is an application specific integrated circuit (ASIC). It integrates micro controller unit (MCU), power management unit (PMU), LCD controller, Keyboard interface, grating detection unit and other peripherals. Working at 10MHz, EYAS can afford 5MHz internal sampling rate and can handle 1.25MHz orthogonal signal from grating sensor. With a simple control interface by keyboard, sensor parameter, data processing and system working mode can be configured. Two LCD controllers can adapt to dot array LCD or segment bit LCD, which comprised output interface. PMU alters system between working and standby mode by clock gating technique to save power. EYAS in test mode (system action are more frequently than real world use) consumes 0.9mw, while 0.2mw in real world use. EYAS achieved the whole grating detection system function, high-speed orthogonal signal handling in a single chip with very low power consumption.
Modelling and simulation of thermal behaviour of vanadium redox flow battery
NASA Astrophysics Data System (ADS)
Yan, Yitao; Li, Yifeng; Skyllas-Kazacos, Maria; Bao, Jie
2016-08-01
This paper extends previous thermal models of the vanadium redox flow battery to predict temperature profiles within multi-cell stacks. This involves modelling the thermal characteristics of the stack as a whole to modelling each individual cell. The study investigates the thermal behaviour for two different scenarios: during standby periods when the pumps are turned off, and in a residential power arbitrage scenario for two types of membranes. It was found that the temperature gradient across the cells is most significant during the standby case, with the simulation results showing completely different thermal behaviours between the two systems.
1991-10-03
NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ CLOSED [] ORIGINATOR CONTROL NUMBER: SDDl-0002 PROGRAM OFFiCE CONTROL NUMBER: DATA ITEM DISCREPANCY WORKSHEET CDRL NUMBER: A006-0250L DATE: 10/03/11 ORIGINATOR NAME: Ronald J. Lacour OFFICE SYMBOL: SAIC TELEPHONE NUMBER: 272-2999 SUBSTANTIVE: X EDITORIAL: PAGE NUMBER: CU2A5040-19 PARA NUMBER: N/A COMMENT OR RECOMMENDED CHANGE: Add "STANDBY PAX" on the last page of this screen. RATIONALE: This redesigned page is for handling standby passengers. However, no mention of that is present.
Performance and safety aspects of the XV-15 tilt rotor research aircraft
NASA Technical Reports Server (NTRS)
Wernicke, K. G.
1977-01-01
Aircraft performance is presented illustrating the flexibility and capability of the XV-15 to conduct its planned proof-of-concept flight research in the areas of dynamics, stability and control, and aerodynamics. Additionally, the aircraft will demonstrate mission-type performance typical of future operational aircraft. The aircraft design is described and discussed with emphasis on the safety and fail-operate features of the aircraft and its systems. Two or more levels of redundancy are provided in the dc and ac electrical systems, hydraulics, conversion, flaps, landing gear extension, SCAS, and force-feel. RPM is maintained by a hydro-electrical blade pitch governor that consists of a primary and standby governor with a cockpit wheel control for manual backup. The two engines are interconnected for operation on a single engine. In the event of total loss of power, the aircraft can enter autorotation starting from the airplane as well as the helicopter mode of flight.
Performance and Health Test Procedure for Grid Energy Storage Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baggu, Murali M; Smith, Kandler A; Friedl, Andrew
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: round-trip efficiency, standby losses, response time/accuracy, and useable energy/state of charge at different discharge/charge rates over the system's lifetime. The procedures are divided into reference performance tests, which require the system to be put in a test mode and are to be conducted in intervals, and real-time monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with littlemore » modification and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditure. Simulated results based on a detailed system simulation of a prototype system are provided as guideline.« less
NASA Technical Reports Server (NTRS)
Beltran, Luis R.; Griffin, Thomas A.
2004-01-01
The U.S. Army Vehicle Technology Directorate at the NASA Glenn Research Center has been directed by their parent command, the U.S. Army Research Laboratory (ARL), to demonstrate active stall technology in a turboshaft engine as the next step in transitioning this technology to the Army and aerospace industry. Therefore, the Vehicle Technology Directorate requested the reactivation of Glenn's Engine Components Research Lab, Cell 2B, (ECRL 2B). They wanted to test a T700 engine that had been used previously for turboshaft engine research as a partnership between the Army and NASA on small turbine engine research. ECRL 2B had been placed in standby mode in 1997. Glenn's Testing Division initiated reactivation in May 2002 to support the new research effort, and they completed reactivation and improvements in September 2003.
NASA Astrophysics Data System (ADS)
Bilgunde, Prathamesh N.; Bond, Leonard J.
2018-04-01
Ultrasonic imaging is a key enabling technology required for in-service inspection of advanced sodium fast reactors at the hot stand-by operating mode (˜250C). Current work presents development of a single element, 2.4MHz, planar, ultrasonic immersion transducer for a potential application in ranging, inspection and imaging of the reactor components. The prototype immersion transducer is first tested in water for three thermal cycles up to 92C. The transducer is further evaluated for four thermal cycles in silicone oil, with total seven thermal cycles that exceeded operation period of 21 hours. Moreover, the preliminary data acquired for speed of sound in silicone oil indicates 24% reduction from 22C to 142C. Sensitivity of the ultrasonic transducer is also measured as a function of temperature and demonstrates the effect of multiple thermal cycles on the transducer components.
MicroPPT-Based Secondary/Backup ACS for a 160-m, 450-kg Solar Sail Spacecraft
NASA Technical Reports Server (NTRS)
Wie, Bong; Murphy, David
2005-01-01
Solar sail tip-mounted, lightweight pulsed plasma thrusters (PPTs) are proposed for a secondary (or backup) attitude control system (ACS) of a 160-m, 450-kg solar sail spacecraft of the Solar Polar Imager (SPI) mission. A propellantless primary ACS of the SPI sailcraft employs trim control masses running along mast lanyards for pitch/yaw control together with roll stabilizer bars at the mast tips for quadrant tilt (roll) control. The robustness of such a propellantless primary ACS would be further enhanced by a secondary ACS utilizing tip-mounted, lightweight PPTs. The microPPT-based ACS is intended mainly for attitude recovery maneuvers from various off-nominal conditions that cannot be reliably handled by the propellantless primary ACS. However, it can also be employed for: i) the checkout or standby mode prior to and during sail deployment, ii) the post-deployment transition mode (prior to the propellantless primary ACS mode operation), iii) the solar sailing cruise mode of a trimmed sailcraft, and iv) the spin-stabilized, sun-pointing, safe mode. Although a conventional bus ACS is required for the SPI mission as the sail is jettisoned at the start of its science mission phase, the microPPT-based ACS option promises greater redundancy and robustness for the SPI mission. For other sailing missions, where the sail is never jettisoned, this secondary ACS provides a lower-cost, lower-mass propulsion for deployment control and greater redundancy than any traditional reaction-jet control system. This paper presents an overview nf the state--of-the--art microPPT technology, the design requirements of microPPTs for solar sail attitude control, and the preliminary ACS design and simulation results.
Intelligent power consumption with two-way shift able feature and its implementation
NASA Astrophysics Data System (ADS)
Xu, Jing; Liu, Youwei
2017-10-01
This paper proposes an intelligent power consumption system with two-way shift able feature and its implementation. Based on power consumption information of standby load and load in working state, a dispatching system decomposes load regulation demand top-down to smart appliances and makes them response orderly as required. It designs a code-based representation method for power consumption information and takes account of standby load, which lays the information foundation for load increment. It also presents a shift able index, which can be used to comprehensively reflect feature of electrical equipment and users and provides a basis for load priority.
Diatomaceous Earth Project put on standby by Texaco
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1986-09-01
Texaco has placed its Diatomite Project, located at McKittrick in California's Kern County, in a standby condition. The Project will be reactivated when conditions in the industry dictate. Texaco stressed that the Project is not being abandoned, but is being put on hold due to the current worldwide energy supply picture. The Lurgi pilot unit is being maintained in condition for future operations. Texaco estimates that the Project could yield in excess of 300 million barrels of 21 to 23 API oil from the oil-bearing diatomite deposits which lie at depths up to 1200 feet. The deposits will be recoveredmore » by open pit mining and back filling techniques.« less
Effects of mobile phone use on specific intensive care unit devices.
Hans, Nidhi; Kapadia, Farhad N
2008-10-01
To observe the effects of mobile phone use in the vicinity of medical devices used in a critical care setting. Electromagnetic interference (EMI) was tested by using two types of mobile phones - GSM and CDMA. Mobile phones were placed at a distance of one foot from three medical devices - syringe pump, mechanical ventilator, and the bedside monitor - in switch off, standby, and talking modes of the phone. Medical devices were observed for any interference caused by the electromagnetic radiations (EMR) from the mobile phones. Out of the three medical devices that were tested, EMI occurred while using the mobile phone in the vicinity of the syringe pump, in the 'talk mode.' The mean variation observed in the calculated and delivered volume of the syringe pump was 2.66 ml. Mechanical ventilator did not show any specific adverse effects with mobile phone use in the one-foot vicinity. No other adverse effects or unexplained malfunctions or shutdown of the syringe pump, mechanical ventilator, or the bedside monitor was noted during the study period of 36 hours. EMI from mobile phones have an adverse effect on the medical devices used in critical care setup. They should be used at least one foot away from the diameter of the syringe pump.
Expert system for UNIX system reliability and availability enhancement
NASA Astrophysics Data System (ADS)
Xu, Catherine Q.
1993-02-01
Highly reliable and available systems are critical to the airline industry. However, most off-the-shelf computer operating systems and hardware do not have built-in fault tolerant mechanisms, the UNIX workstation is one example. In this research effort, we have developed a rule-based Expert System (ES) to monitor, command, and control a UNIX workstation system with hot-standby redundancy. The ES on each workstation acts as an on-line system administrator to diagnose, report, correct, and prevent certain types of hardware and software failures. If a primary station is approaching failure, the ES coordinates the switch-over to a hot-standby secondary workstation. The goal is to discover and solve certain fatal problems early enough to prevent complete system failure from occurring and therefore to enhance system reliability and availability. Test results show that the ES can diagnose all targeted faulty scenarios and take desired actions in a consistent manner regardless of the sequence of the faults. The ES can perform designated system administration tasks about ten times faster than an experienced human operator. Compared with a single workstation system, our hot-standby redundancy system downtime is predicted to be reduced by more than 50 percent by using the ES to command and control the system.
Pre-travel care for immunocompromised and chronically ill travellers: A retrospective study.
van Aalst, Mariëlle; Verhoeven, Roos; Omar, Freshta; Stijnis, Cornelis; van Vugt, Michèle; de Bree, Godelieve J; Goorhuis, Abraham; Grobusch, Martin P
2017-09-01
Immunocompromised and chronically ill travellers (ICCITs) are susceptible to travel related diseases. In ICCITs, pre-travel care regarding vaccinations and prophylactics is complex. We evaluated the protection level by preventive measures in ICCITs by analysing rates of vaccination protection, antibody titres, and the prescription of standby antibiotics. We analysed, and reported according to STROBE guidelines, pre-travel care data for ICCITs visiting the medical pre-travel clinic at the Academic Medical Centre, The Netherlands from 2011 to 2016. We analysed 2104 visits of 1826 ICCITs. Mean age was 46.6 years and mean travel duration 34.5 days. ICCITs on immunosuppressive treatment (29.7%), HIV (17.2%) or diabetes mellitus (10.2%) comprised the largest groups. Most frequently visited countries were Suriname, Indonesia, and Ghana. Most vaccination rates were >90%. Of travellers in high need of hepatitis A and B protection, 56.6 and 75.7%, underwent titre assessments, respectively. Of ICCITs with a respective indication, 50.6% received a prescription for standby antibiotics. Vaccination rates in our study population were overall comparable to those of healthy travellers studied previously in our centre. However, regarding antibody titre assessments and prescription of standby antibiotics, this study demonstrates that uniform pre-travel guidelines for ICCITs are highly needed. Copyright © 2017 Elsevier Ltd. All rights reserved.
Expert System for UNIX System Reliability and Availability Enhancement
NASA Technical Reports Server (NTRS)
Xu, Catherine Q.
1993-01-01
Highly reliable and available systems are critical to the airline industry. However, most off-the-shelf computer operating systems and hardware do not have built-in fault tolerant mechanisms, the UNIX workstation is one example. In this research effort, we have developed a rule-based Expert System (ES) to monitor, command, and control a UNIX workstation system with hot-standby redundancy. The ES on each workstation acts as an on-line system administrator to diagnose, report, correct, and prevent certain types of hardware and software failures. If a primary station is approaching failure, the ES coordinates the switch-over to a hot-standby secondary workstation. The goal is to discover and solve certain fatal problems early enough to prevent complete system failure from occurring and therefore to enhance system reliability and availability. Test results show that the ES can diagnose all targeted faulty scenarios and take desired actions in a consistent manner regardless of the sequence of the faults. The ES can perform designated system administration tasks about ten times faster than an experienced human operator. Compared with a single workstation system, our hot-standby redundancy system downtime is predicted to be reduced by more than 50 percent by using the ES to command and control the system.
NASA Astrophysics Data System (ADS)
Kwok, Yu Fat
The main objective of this study is to develop a model for the determination of optimum testing interval (OTI) of non-redundant standby plants. This study focuses on the emergency power generators in tall buildings in Hong Kong. The model for the reliability, which is developed, is applicable to any non-duplicated standby plant. In a tall building, the mobilisation of occupants is constrained by its height and the building internal layout. Occupant's safety, amongst other safety considerations, highly depends on the reliability of the fire detection and protection system, which in turn is dependent on the reliability of the emergency power generation plants. A thorough literature survey shows that the practice used in determining OTI in nuclear plants is generally applicable. Historically, the OTI in these plants is determined by balancing the testing downtime and reliability gained from frequent testing. However, testing downtime does not exist in plants like emergency power generator. Subsequently, sophisticated models have taken repairing downtime into consideration. In this study, the algorithms for the determination of OTI, and hence reliability of standby plants, are reconsidered. A new concept is introduced into the subject. A new model is developed for such purposes which embraces more realistic factors found in practice. System aging and the finite life cycle of the standby plant are considered. Somewhat more pragmatic is that the Optimum Overhauling Interval can also be determined from this new model. System unavailability grow with time, but can be reset by test or overhaul. Contrary to fixed testing intervals, OTI is determined whenever system point unavailability exceeds certain level, which depends on the reliability requirement of the standby system. An optimum testing plan for lowering this level to the 'minimum useful unavailability' level (see section 9.1 for more elaboration) can be determined by the new model presented. Cost effectiveness is accounted for by a new parameter 'tau min', the minimum testing interval (MTI). The MTI optimises the total number of tests and the total number of overhauls, when the costs for each are available. The model sets up criteria for test and overhaul and to 'announce' end of system life. The usefulness of the model is validated by a detailed analysis of the operating parameters from 8,500 maintenance records collected for emergency power generation plants in high rise buildings in Hong Kong. (Abstract shortened by UMI.)
48 CFR 52.222-2 - Payment for Overtime Premiums.
Code of Federal Regulations, 2010 CFR
2010-10-01
... in connection with administration, protection, transportation, maintenance, standby plant protection, operation of utilities, or accounting; (3) To perform tests, industrial processes, laboratory procedures...
Official Guard and Reserve Manpower Strengths and Statistics. FY 2001 Summary
2001-01-01
Status 2.023 Standby Reserve - Inactive Status 2.024 Total Standby Reserve 2.025 A5 STRENGTH BY RACE, SEX AND UNIT STATE CODE Selected...pN fNO^NNrsinm OiO- icON ^iD’-i m Lft rn ^ m T-I ^r *• PM co <•« us m fN *-* tO i co $ ot en v ^ i momoococo f> in rs ^r m ^H I v fN...r ma) *owm^rvftMf^«^««3inQ^»Q«rv«p^o\\mv\\or^^r^ a5 (DorNi^Q«>oa3oo o v- IN -» v 10 -* m 00 rv IN mn*-«^fNm—-mmmmiNin -* *F « r*. in in
NASA Technical Reports Server (NTRS)
Mickle, Marlin H. (Inventor); Jones, Alex K. (Inventor); Cain, James T. (Inventor); Hawrylak, Peter J. (Inventor); Marx, Frank (Inventor); Hoare, Raymond R. (Inventor)
2012-01-01
A transponder that may be used as an RFID tag includes a passive circuit to eliminate the need for an "always on" active RF receiving element to anticipate a wake-up signal for the balance of the transponder electronics. This solution allows the entire active transponder to have all circuit elements in a sleep (standby) state, thus drastically extending battery life or other charge storage device life. Also, a wake-up solution that reduces total energy consumption of an active transponder system by allowing all non-addressed transponders to remain in a sleep (standby) state, thereby reducing total system or collection energy. Also, the transponder and wake-up solution are employed in an asset tracking system.
NASA Technical Reports Server (NTRS)
Mickle, Marlin H. (Inventor); Jones, Alex K. (Inventor); Cain, James T. (Inventor); Hawrylak, Peter J. (Inventor); Marx, Frank (Inventor); Hoare, Raymond R. (Inventor)
2011-01-01
A transponder that may be used as an RFID tag includes a passive circuit to eliminate the need for an "always on" active RF receiving element to anticipate a wake-up signal for the balance of the transponder electronics. This solution allows the entire active transponder to have all circuit elements in a sleep (standby) state, thus drastically extending battery life or other charge storage device life. Also, a wake-up solution that reduces total energy consumption of an active transponder system by allowing all non-addressed transponders to remain in a sleep (standby) state, thereby reducing total system or collection energy. Also, the transponder and wake-up solution are employed in an asset tracking system.
A sub-nW 2.4 GHz Transmitter for Low Data-Rate Sensing Applications
Mercier, Patrick P.; Bandyopadhyay, Saurav; Lysaght, Andrew C.; Stankovic, Konstantina M.; Chandrakasan, Anantha P.
2015-01-01
This paper presents the design of a narrowband transmitter and antenna system that achieves an average power consumption of 78 pW when operating at a duty-cycled data rate of 1 bps. Fabricated in a 0.18 µm CMOS process, the transmitter employs a direct-RF power oscillator topology where a loop antenna acts as a both a radiative and resonant element. The low-complexity single-stage architecture, in combination with aggressive power gating techniques and sizing optimizations, limited the standby power of the transmitter to only 39.7 pW at 0.8 V. Supporting both OOK and FSK modulations at 2.4 GHz, the transmitter consumed as low as 38 pJ/bit at an active-mode data rate of 5 Mbps. The loop antenna and integrated diodes were also used as part of a wireless power transfer receiver in order to kick-start the system power supply during energy harvesting operation. PMID:26246641
Viking Orbiter 1975 articulation control subsystem design analysis
NASA Technical Reports Server (NTRS)
Horiuchi, H. H.; Vallas, L. J.
1973-01-01
The articulation control subsystem, developed for the Viking Orbiter 1975 spacecraft, is a digital, multiplexed, closed-loop servo system used to control the pointing and positioning of the science scan platform and the high-gain communication antenna, and to position the solar-energy controller louver blades for the thermal control of the propellant tanks. The development, design, and anlaysis of the subsystem is preliminary. The subsystem consists of a block-redundant control electronics multiplexed among eight control actuators. Each electronics block is capable of operating either individually or simultaneously with the second block. This provides the subsystem the capability of simultaneous two-actuator control or a single actuator control with the second block in a stand-by redundant mode. The result of the preliminary design and analysis indicates that the subsystem will perform satisfactorily in the Viking Orbiter 1975 mission. Some of the parameter values used, particularly those in the subsystem dynamics and the error estimates, are preliminary and the results will be updated as more accurate parameter values become available.
Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baggu, Murali M; Smith, Kandler A; Friedl, Andrew
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS withmore » little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.« less
Intermittent pacemaker dysfunction caused by digital mobile telephones.
Naegeli, B; Osswald, S; Deola, M; Burkart, F
1996-05-01
This study was designed to evaluate possible interactions between digital mobile telephones and implanted pacemakers. Electromagnetic fields may interfere with normal pacemaker function. Development of bipolar sensing leads and modern noise filtering techniques have lessened this problem. However, it remains unclear whether these features also protect from high frequency noise arising from digital cellular phones. In 39 patients with an implanted pacemaker (14 dual-chamber [DDD], 8 atrial-synchronized ventricular-inhibited [VDD(R)] and 17 ventricular-inhibited [VVI(R)] pacemakers), four mobile phones with different levels of power output (2 and 8 W) were tested in the standby, dialing and operating mode. During continuous electrocardiographic monitoring, 672 tests were performed in each mode with the phones positioned over the pulse generator, the atrial and the ventricular electrode tip. The tests were carried out at different sensitivity settings and, where possible, in the unipolar and bipolar pacing modes as well. In 7 (18%) of 39 patients, a reproducible interference was induced during 26 (3.9%) of 672 tests with the operating phones in close proximity (<10 cm) to the pacemaker. In 22 dual-chamber (14 DDD, 8 VDD) pacemakers, atrial triggering occurred in 7 (2.8%) of 248 and ventricular inhibition in 5 (2.8%) of 176 tests. In 17 VVI(R) systems, pacemaker inhibition was induced in 14 (5.6%) of 248 tests. Interference was more likely to occur at higher power output of the phone and at maximal sensitivity of the pacemakers (maximal vs. nominal sensitivity, 6% vs. 1.8% positive test results, p = 0.009). When the bipolar and unipolar pacing modes were compared in the same patients, ventricular inhibition was induced only in the unipolar mode (12.5% positive test results, p = 0.0003). Digital mobile phones in close proximity to implanted pacemakers may cause intermittent pacemaker dysfunction with inappropriate ventricular tracking and potentially dangerous pacemaker inhibition.
Whole-Home Dehumidifiers: Field-Monitoring Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burke, Tom; Willem, Henry; Ni, Chun Chun
2014-09-23
Lawrence Berkeley National Laboratory (LBNL) initiated a WHD field-metering study to expand current knowledge of and obtain data on WHD operation and energy consumption in real-world applications. The field study collected real-time data on WHD energy consumption, along with information regarding housing characteristics, consumer behavior, and various outdoor conditions expected to affect WHD performance and efficiency. Although the metering study collected similar data regarding air conditioner operation, this report discusses only WHDs. The primary objectives of the LBNL field-metering study are to (1) expand knowledge of the configurations, energy consumption profiles, consumer patterns of use (e.g., relative humidity [RH] settings),more » and environmental parameters of whole-home dehumidification systems; and (2) develop distributions of hours of dehumidifier operation in four operating modes: off, standby, fan-only, and compressor (also called dehumidification mode). Profiling energy consumption entails documenting the power consumption, duration of power consumption in different modes, condensate generation, and properties of output air of an installed system under field conditions of varying inlet air temperature and RH, as well as system configuration. This profiling provides a more detailed and deeper understanding of WHD operation and its complexities. This report describes LBNL’s whole-home dehumidification field-metering study conducted at four homes in Wisconsin and Florida. The initial phase of the WHD field-metering study was conducted on one home in Madison, Wisconsin, from June to December of 2013. During a second phase, three Florida homes were metered from June to October of 2014. This report presents and examines data from the Wisconsin site and from the three Florida sites.« less
Iizuka, Naotaka; Awano, Shuji; Ansai, Toshihiro
2012-01-01
This study aimed to verify whether salivary α-amylase enzyme activity (Amy) is useful as a biomarker of stress in pilots working in a stressful environment. The subjects in this study were nine Japan air self-defense force pilots who participated in Iraq reconstruction support activity in Kuwait. Amy was measured using a portable salivary amylase monitor at preflight, postflight, and on stand-by day. In addition, the state-trait anxiety inventory was administered with state scores (STAI-S) compared to Amy levels. There were greater differences in Amy levels at baseline compared to STAI-S scores between subjects on the stand-by day. Amy levels at preflight tended to increase compared to those on stand-by day as did STAI-S. The change in Amy level at postflight varied among the pilots. The Amy levels of four subjects at postflight were elevated compared to levels at preflight, while the STAI-S scores for all pilots at postflight were lower than at preflight. This study suggests that the Amy level of pilots can reflect subtle individual differences in response to the psychological and physiological stress of a flight task. Thus, monitoring Amy level may be useful for stress evaluation of pilots working in a stressful environment, providing data that might be used as an impetus for addressing stress management for this population. Copyright © 2012 Wiley Periodicals, Inc.
Coal slurry fuel supply and purge system
McDowell, Robert E.; Basic, Steven L.; Smith, Russel M.
1994-01-01
A coal slurry fuel supply and purge system for a locomotive engines is disclosed which includes a slurry recirculation path, a stand-by path for circulating slurry during idle or states of the engine when slurry fuel in not required by the engine, and an engine header fluid path connected to the stand-by path, for supplying and purging slurry fuel to and from fuel injectors. A controller controls the actuation of valves to facilitate supply and purge of slurry to and from the fuel injectors. A method for supplying and purging coal slurry in a compression ignition engine is disclosed which includes controlling fluid flow devices and valves in a plurality of fluid paths to facilitate continuous slurry recirculation and supply and purge of or slurry based on the operating state of the engine.
14 CFR 171.9 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... licensing requirements. (b) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated, with a supplemental standby system, if needed. (c...
14 CFR 171.9 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... licensing requirements. (b) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated, with a supplemental standby system, if needed. (c...
14 CFR 171.9 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... licensing requirements. (b) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated, with a supplemental standby system, if needed. (c...
Code of Federal Regulations, 2013 CFR
2013-07-01
... concerned. Extreme personal hardship. An adverse impact on a Reservist's dependents resulting from his or... individuals who may be mobilized as needed to fill manpower needs in specific skills. The Standby Reserve...
Code of Federal Regulations, 2010 CFR
2010-07-01
... concerned. Extreme personal hardship. An adverse impact on a Reservist's dependents resulting from his or... individuals who may be mobilized as needed to fill manpower needs in specific skills. The Standby Reserve...
Code of Federal Regulations, 2011 CFR
2011-07-01
... concerned. Extreme personal hardship. An adverse impact on a Reservist's dependents resulting from his or... individuals who may be mobilized as needed to fill manpower needs in specific skills. The Standby Reserve...
Code of Federal Regulations, 2012 CFR
2012-07-01
... concerned. Extreme personal hardship. An adverse impact on a Reservist's dependents resulting from his or... individuals who may be mobilized as needed to fill manpower needs in specific skills. The Standby Reserve...
Code of Federal Regulations, 2014 CFR
2014-07-01
... concerned. Extreme personal hardship. An adverse impact on a Reservist's dependents resulting from his or... individuals who may be mobilized as needed to fill manpower needs in specific skills. The Standby Reserve...
being unplugged. These products draw power 24 hours a day, often without the knowledge of the consumer Define & Measure Data Reports & Links Archives Contact © Building Technology and Urban Systems
10 CFR 430.4 - Sources for information and guidance.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., 1993. (2) [Reserved] (c) IEEE. Institute of Electrical and Electronics Engineers, Inc., 3 Park Avenue....ch. (1) IEC 62301, Household electrical appliances—Measurement of standby power, First Edition, June...
10 CFR 430.4 - Sources for information and guidance.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., 1993. (2) [Reserved] (c) IEEE. Institute of Electrical and Electronics Engineers, Inc., 3 Park Avenue....ch. (1) IEC 62301, Household electrical appliances—Measurement of standby power, First Edition, June...
10 CFR 430.4 - Sources for information and guidance.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., 1993. (2) [Reserved] (c) IEEE. Institute of Electrical and Electronics Engineers, Inc., 3 Park Avenue....ch. (1) IEC 62301, Household electrical appliances—Measurement of standby power, First Edition, June...
10 CFR 430.4 - Sources for information and guidance.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., 1993. (2) [Reserved] (c) IEEE. Institute of Electrical and Electronics Engineers, Inc., 3 Park Avenue....ch. (1) IEC 62301, Household electrical appliances—Measurement of standby power, First Edition, June...
Code of Federal Regulations, 2012 CFR
2012-01-01
... biweekly pay period), excluding sleep and standby duty hours, provided the regular tour of duty does not... effect throughout the year, averages at least 106 hours per biweekly pay period; and (2) Who is in a...
Code of Federal Regulations, 2013 CFR
2013-01-01
... biweekly pay period), excluding sleep and standby duty hours, provided the regular tour of duty does not... effect throughout the year, averages at least 106 hours per biweekly pay period; and (2) Who is in a...
Code of Federal Regulations, 2014 CFR
2014-01-01
... biweekly pay period), excluding sleep and standby duty hours, provided the regular tour of duty does not... effect throughout the year, averages at least 106 hours per biweekly pay period; and (2) Who is in a...
Operations and Maintenance May Newsletter | Poster
Occurring without notice, unscheduled utility outages (mainly electrical) are abrupt and create a nuisance. During an unscheduled electrical power outage, the Operations and Maintenance (O&M) department will monitor stand-by generators for proper operation.
40 CFR 52.2320 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dated February 5, 1985, HAFB AO for Paint Booth, HVAC Modification, Standby Generators, and Fuel Storage... implementation of the inspection of vehicle On-Board Diagnostic (OBD) systems starting January 1, 2002 in all...
40 CFR 52.2320 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dated February 5, 1985, HAFB AO for Paint Booth, HVAC Modification, Standby Generators, and Fuel Storage... implementation of the inspection of vehicle On-Board Diagnostic (OBD) systems starting January 1, 2002 in all...
40 CFR 52.2320 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dated February 5, 1985, HAFB AO for Paint Booth, HVAC Modification, Standby Generators, and Fuel Storage... implementation of the inspection of vehicle On-Board Diagnostic (OBD) systems starting January 1, 2002 in all...
NASA Technical Reports Server (NTRS)
Tapia, Moiez A.
1993-01-01
The study of a comparative analysis of distinct multiplex and fault-tolerant configurations for a PLC-based safety system from a reliability point of view is presented. It considers simplex, duplex and fault-tolerant triple redundancy configurations. The standby unit in case of a duplex configuration has a failure rate which is k times the failure rate of the standby unit, the value of k varying from 0 to 1. For distinct values of MTTR and MTTF of the main unit, MTBF and availability for these configurations are calculated. The effect of duplexing only the PLC module or only the sensors and the actuators module, on the MTBF of the configuration, is also presented. The results are summarized and merits and demerits of various configurations under distinct environments are discussed.
Stochastic availability analysis of operational data systems in the Deep Space Network
NASA Technical Reports Server (NTRS)
Issa, T. N.
1991-01-01
Existing availability models of standby redundant systems consider only an operator's performance and its interaction with the hardware performance. In the case of operational data systems in the Deep Space Network (DSN), in addition to an operator system interface, a controller reconfigures the system and links a standby unit into the network data path upon failure of the operating unit. A stochastic (Markovian) process technique is used to model and analyze the availability performance and occurrence of degradation due to partial failures are quantitatively incorporated into the model. Exact expressions of the steady state availability and proportion degraded performance measures are derived for the systems under study. The interaction among the hardware, operator, and controller performance parameters and that interaction's effect on data availability are evaluated and illustrated for an operational data processing system.
46 CFR Sec. 4 - Port facilities predesignated for emergency use.
Code of Federal Regulations, 2010 CFR
2010-10-01
... standby contracts or agreements for use by Government agencies shall be controlled directly by the NSA. (b... released. The Director, NSA shall have the discretion to approve contracts for subsequent exclusive use by...
46 CFR Sec. 4 - Port facilities predesignated for emergency use.
Code of Federal Regulations, 2011 CFR
2011-10-01
... standby contracts or agreements for use by Government agencies shall be controlled directly by the NSA. (b... released. The Director, NSA shall have the discretion to approve contracts for subsequent exclusive use by...
46 CFR Sec. 4 - Port facilities predesignated for emergency use.
Code of Federal Regulations, 2012 CFR
2012-10-01
... standby contracts or agreements for use by Government agencies shall be controlled directly by the NSA. (b... released. The Director, NSA shall have the discretion to approve contracts for subsequent exclusive use by...
46 CFR Sec. 4 - Port facilities predesignated for emergency use.
Code of Federal Regulations, 2014 CFR
2014-10-01
... standby contracts or agreements for use by Government agencies shall be controlled directly by the NSA. (b... released. The Director, NSA shall have the discretion to approve contracts for subsequent exclusive use by...
46 CFR Sec. 4 - Port facilities predesignated for emergency use.
Code of Federal Regulations, 2013 CFR
2013-10-01
... standby contracts or agreements for use by Government agencies shall be controlled directly by the NSA. (b... released. The Director, NSA shall have the discretion to approve contracts for subsequent exclusive use by...
46 CFR 12.15-9 - Examination requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... X X X 18. The procedure in preparing a turbine, reciprocating, or Diesel engine for standby; also... various types of generators and motors, both A.C. and D.C X X X 27. Operation, installation, and...
Shahin, Saba; Singh, Surya P; Chaturvedi, Chandra M
2018-09-01
Present study was carried out to investigate the effect of long-term mobile phone radiation exposure in different operative modes (Dialing, Receiving, and Stand-by) on immature male mice. Three-week old male mice were exposed to mobile phone (1800 MHz) radiation for 3 hr/day for 120 days in different operative modes. To check the changes/alteration in testicular histoarchitecture and serum testosterone level, HE staining and ELISA was performed respectively. Further, we have checked the redox status (ROS, NO, MDA level, and antioxidant enzymes: SOD, CAT, and GPx) by biochemical estimation, alteration in the expression of pro-apoptotic proteins (p53 and Bax), active executioner caspase-3, full length/uncleaved PARP-1 (DNA repair enzyme), anti-apoptotic proteins (Bcl-2 and Bcl-x L ) in testes by immunofluorescence and cytosolic cytochrome-c by Western blot. Decreased seminiferous tubule diameter, sperm count, and viability along with increased germ cells apoptosis and decreased serum testosterone level, was observed in the testes of all the mobile phone exposed mice compared with control. We also observed that, mobile phone radiation exposure in all the three different operative modes alters the testicular redox status via increasing ROS, NO, and MDA level, and decreasing antioxidant enzymes levels leading to enhanced apoptosis of testicular cells by increasing the expression of pro-apoptotic and apoptotic proteins along with decreasing the expression of anti-apoptotic protein. On the basis of results, it is conclude that long-term mobile phone radiation exposure induced oxidative stress leads to apoptosis of testicular cells and thus impairs testicular function. © 2018 Wiley Periodicals, Inc.
Static Feed Water Electrolysis Subsystem Testing and Component Development
NASA Technical Reports Server (NTRS)
Koszenski, E. P.; Schubert, F. H.; Burke, K. A.
1983-01-01
A program was carried out to develop and test advanced electrochemical cells/modules and critical electromechanical components for a static feed (alkaline electrolyte) water electrolysis oxygen generation subsystem. The accomplishments were refurbishment of a previously developed subsystem and successful demonstration for a total of 2980 hours of normal operation; achievement of sustained one-person level oxygen generation performance with state-of-the-art cell voltages averaging 1.61 V at 191 ASF for an operating temperature of 128F (equivalent to 1.51V when normalized to 180F); endurance testing and demonstration of reliable performance of the three-fluid pressure controller for 8650 hours; design and development of a fluid control assembly for this subsystem and demonstration of its performance; development and demonstration at the single cell and module levels of a unitized core composite cell that provides expanded differential pressure tolerance capability; fabrication and evaluation of a feed water electrolyte elimination five-cell module; and successful demonstration of an electrolysis module pressurization technique that can be used in place of nitrogen gas during the standby mode of operation to maintain system pressure and differential pressures.
Enhanced Component Performance Study: Turbine-Driven Pumps 1998–2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schroeder, John Alton
2015-11-01
This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2014 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The TDP failure modes considered are failure to start (FTS), failure to run less than or equal to one hour (FTR=1H), failure to run more than one hour (FTR>1H), and normally running systems FTS and failure to run (FTR). The component reliability estimates and themore » reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified for TDP unavailability, for frequency of start demands for standby TDPs, and for run hours in the first hour after start. Statistically significant decreasing trends were identified for start demands for normally running TDPs, and for run hours per reactor critical year for normally running TDPs.« less
Analysis of the position of robotic cell components and its impact on energy consumption by robot
NASA Astrophysics Data System (ADS)
Banas, W.; Gwiazda, A.; Monica, Z.; Sekala, A.; Foit, K.
2016-08-01
Location elements in the robot cell is very important must provide reasonable access to technological points. This is a basic condition, but it is possible to shift these elements worth considering over other criteria. One of them can be energy consumption. This is an economic parameter and in most cases its improvement make shorten the working time an industrial robot. In most conventional mechanical systems you do not need to consume power in standby mode only for a move. Robot because of its construction, even if it does not move has enabled engines and is ready to move. In this case, the servo speed is zero. During this stop servo squeak. Low-speed motors cause the engine torque is reduced and increases power consumption. In larger robots are installed brakes that when the robot does not move mechanically hold the position. Off the robot has enabled brakes and remembers the position servo drives. Brakes must be released when the robot wants to move and drives hold the position.
38 CFR 59.130 - General requirements for all State home facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Veterans Affairs, Office of Regulations Management (02D), Room 1154, 810 Vermont Avenue, NW, Washington, DC... of power must be an on-site emergency standby generator of sufficient size to serve the connected...
36. SITE BUILDING 004 ELECTRIC POWER STATION CLOSE ...
36. SITE BUILDING 004 - ELECTRIC POWER STATION - CLOSE UP VIEW OF 1200 HORSEPOWER STANDBY POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
37. SITE BUILDING 004 ELECTRIC POWER STATION ELEVATED ...
37. SITE BUILDING 004 - ELECTRIC POWER STATION - ELEVATED VIEW OF FIVE (5) 1200 HORSEPOWER STANDBY - POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
46 CFR 12.15-9 - Examination requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... X X X 18. The procedure in preparing a turbine, reciprocating, or Diesel engine for standby; also... supply of water to boilers, the dangers of high and low water and remedial action X X X 20. Operation...
46 CFR 12.15-9 - Examination requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... X X X 18. The procedure in preparing a turbine, reciprocating, or Diesel engine for standby; also... supply of water to boilers, the dangers of high and low water and remedial action X X X 20. Operation...
Payne, W. Vance
2017-01-01
A 2715 ft2 (252 m2), two story, residential home of the style typical of the Gaithersburg, Maryland area was constructed in 2012 to demonstrate technologies for net-zero energy (NZE) homes (or ZEH). The NIST Net-Zero Energy Residential Test Facility (NZERTF) functions as a laboratory to support the development and adoption of cost-effective NZE designs, technologies, construction methods, and building codes. The primary design goal was to meet the comfort and functional needs of the simulated occupants. The first annual test period began on July 1, 2013 and ended June 30, 2014. During the first year of operation, the home's annual energy consumption was 13039 kWh (4.8 kWh ft-2, 51.7 kWh m-2), and the 10.2 kW solar photovoltaic system generated an excess of 484 kWh. During this period the heating and air conditioning of the home was performed by a novel air-source heat pump that utilized a reheat heat exchanger to allow hot compressor discharge gas to reheat the supply air during a dedicated dehumidification mode. During dedicated dehumidification, room temperature air was supplied to the living space until the relative humidity setpoint of 50% was satisfied. The heat pump consumed a total of 6225 kWh (2.3 kWh ft-2, 24.7 kWh m-2) of electrical energy for cooling, heating, and dehumidification. Annual cooling efficiency was 10.1 Btu W-1h-1 (2.95 W W-1), relative to the rated SEER of the heat pump of 15.8 Btu W-1h-1 (4.63 W W-1). Annual heating efficiency was 7.10 Btu W-1h-1 (2.09 W W-1), compared with the unit's rated HSPF of 9.05 Btu W-1h-1 (2.65 W W-1). These field measured efficiency numbers include dedicated dehumidification operation and standby energy use for the year. Annual sensible heat ratio was approximately 70%. Standby energy consumption was 5.2 % and 3.5 % of the total electrical energy used for cooling and heating, respectively. PMID:28729740
Payne, W Vance
2016-01-01
A 2715 ft 2 (252 m 2 ), two story, residential home of the style typical of the Gaithersburg, Maryland area was constructed in 2012 to demonstrate technologies for net-zero energy (NZE) homes (or ZEH). The NIST Net-Zero Energy Residential Test Facility (NZERTF) functions as a laboratory to support the development and adoption of cost-effective NZE designs, technologies, construction methods, and building codes. The primary design goal was to meet the comfort and functional needs of the simulated occupants. The first annual test period began on July 1, 2013 and ended June 30, 2014. During the first year of operation, the home's annual energy consumption was 13039 kWh (4.8 kWh ft -2 , 51.7 kWh m -2 ), and the 10.2 kW solar photovoltaic system generated an excess of 484 kWh. During this period the heating and air conditioning of the home was performed by a novel air-source heat pump that utilized a reheat heat exchanger to allow hot compressor discharge gas to reheat the supply air during a dedicated dehumidification mode. During dedicated dehumidification, room temperature air was supplied to the living space until the relative humidity setpoint of 50% was satisfied. The heat pump consumed a total of 6225 kWh (2.3 kWh ft -2, 24.7 kWh m -2 ) of electrical energy for cooling, heating, and dehumidification. Annual cooling efficiency was 10.1 Btu W -1 h -1 (2.95 W W -1 ), relative to the rated SEER of the heat pump of 15.8 Btu W -1 h -1 (4.63 W W -1 ). Annual heating efficiency was 7.10 Btu W -1 h -1 (2.09 W W -1 ), compared with the unit's rated HSPF of 9.05 Btu W -1 h -1 (2.65 W W -1 ). These field measured efficiency numbers include dedicated dehumidification operation and standby energy use for the year. Annual sensible heat ratio was approximately 70%. Standby energy consumption was 5.2 % and 3.5 % of the total electrical energy used for cooling and heating, respectively.
Code of Federal Regulations, 2012 CFR
2012-10-01
... July 31, 2001, Energy Efficient Standby Power Devices. (f) Executive Order 13423 of January 24, 2007... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Contracting for Environmentally Preferable Products and Services 23.702 Authorities...
5 CFR 550.1303 - Hourly rates of basic pay.
Code of Federal Regulations, 2010 CFR
2010-01-01
... generally consist of 24-hour shifts with a significant amount of designated standby and sleep time), the... annual rate in effect at the time the hour was actually worked. [63 FR 64593, Nov. 23, 1998, as amended...
5 CFR 550.1303 - Hourly rates of basic pay.
Code of Federal Regulations, 2012 CFR
2012-01-01
... generally consist of 24-hour shifts with a significant amount of designated standby and sleep time), the... annual rate in effect at the time the hour was actually worked. [63 FR 64593, Nov. 23, 1998, as amended...
5 CFR 550.1303 - Hourly rates of basic pay.
Code of Federal Regulations, 2013 CFR
2013-01-01
... generally consist of 24-hour shifts with a significant amount of designated standby and sleep time), the... annual rate in effect at the time the hour was actually worked. [63 FR 64593, Nov. 23, 1998, as amended...
5 CFR 550.1303 - Hourly rates of basic pay.
Code of Federal Regulations, 2011 CFR
2011-01-01
... generally consist of 24-hour shifts with a significant amount of designated standby and sleep time), the... annual rate in effect at the time the hour was actually worked. [63 FR 64593, Nov. 23, 1998, as amended...
5 CFR 550.1303 - Hourly rates of basic pay.
Code of Federal Regulations, 2014 CFR
2014-01-01
... generally consist of 24-hour shifts with a significant amount of designated standby and sleep time), the... annual rate in effect at the time the hour was actually worked. [63 FR 64593, Nov. 23, 1998, as amended...
Venezuela: A Revolution on Standby
Blessed with rich agricultural terrain, Venezuela currently retains the largest proven reserves of petroleum in the world. Surprisingly, though, the...Venezuelas food crisis results from over-reliance on the oil industry, lack of a developed agricultural sector, strong dependence on food imports
Distributed Electrical Power Generation: Summary of Alternative Available Technologies
2003-09-01
standby charges, among others. Federal law (Public Utilities Regulatory Policy Act [ PURPA ] Section 210) prohibits utilities from assessing...a customer-generator. PURPA . The PURPA of 1978 requires electric utilities to purchase electricity produced from any qualifying power producers
Third-generation mobile phones (UMTS) do not interfere with permanent implanted pacemakers.
Ismail, Mohamed M; Badreldin, Akmal M A; Heldwein, Matthias; Hekmat, Khosro
2010-07-01
Third-generation mobile phones, UMTS (Universal Mobile Telecommunication System), were recently introduced in Europe. The safety of these devices with regard to their interference with implanted pacemakers is as yet unknown and is the point of interest in this study. The study comprised 100 patients with permanent pacemaker implantation between November 2004 and June 2005. Two UMTS cellular phones (T-Mobile, Vodafone) were tested in the standby, dialing, and operating mode with 23 single-chamber and 77 dual-chamber pacemakers. Continuous surface electrocardiograms (ECGs), intracardiac electrograms, and marker channels were recorded when calls were made by a stationary phone to cellular phone. All pacemakers were tested under a "worst-case scenario," which includes a programming of the pacemaker to unipolar sensing and pacing modes and inducing of a maximum sensitivity setting during continuous pacing of the patient. Patients had pacemaker implantation between June 1990 and April 2005. The mean age was 68.4 +/- 15.1 years. Regardless of atrial and ventricular sensitivity settings, both UMTS mobile phones (Nokia 6650 and Motorola A835) did not show any interference with all tested pacemakers. In addition, both cellular phones did not interfere with the marker channels and the intracardiac ECGs of the pacemakers. Third-generation mobile phones are safe for patients with permanent pacemakers. This is due to the high-frequency band for this system (1,800-2,200 MHz) and the low power output between 0.01 W and 0.25 W.
Code of Federal Regulations, 2014 CFR
2014-01-01
... institution. The term domestic depository institution means a financial institution that engages in the... substitute. Direct credit substitutes include: (1) Financial standby letters of credit that support financial claims on a third party that exceed a savings association's pro rata share in the financial claim; (2...
Code of Federal Regulations, 2013 CFR
2013-01-01
... institution. The term domestic depository institution means a financial institution that engages in the... substitute. Direct credit substitutes include: (1) Financial standby letters of credit that support financial claims on a third party that exceed a savings association's pro rata share in the financial claim; (2...
Code of Federal Regulations, 2012 CFR
2012-01-01
... institution. The term domestic depository institution means a financial institution that engages in the... substitute. Direct credit substitutes include: (1) Financial standby letters of credit that support financial claims on a third party that exceed a savings association's pro rata share in the financial claim; (2...
Automated Testability Decision Tool
1991-09-01
Vol. 16,1968, pp. 538-558. Bertsekas, D. P., "Constraints Optimization and Lagrange Multiplier Methods," Academic Press, New York. McLeavey , D.W... McLeavey , J.A., "Parallel Optimization Methods in Standby Reliability, " University of Connecticut, School of Business Administration, Bureau of Business
[Medical emergencies and sea rescue].
Lefebvre, Fabien; Albert, Christophe; Gunepin, David; Pondaven, Eric; Querellou, Emgan
2013-01-01
Military nurses and doctors are on permanent standby to respond to any medical emergency which may arise at sea. This atypical form of practice is part of a specific organisation, in order to provide optimal, high-quality care in the most remote places of the oceans.
33 CFR 146.140 - Emergency Evacuation Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... be contacted; (5) List the facility's communications equipment, its available frequencies, and the communications schedules with shore installations, standby vessels, rescue aircraft, and other OCS facilities... its personnel would be placed in jeopardy and a mass evacuation of the facility's personnel would be...
Code of Federal Regulations, 2014 CFR
2014-01-01
... environmental laws or regulations such as those related to pollution abatement or human health and the... a covered event(s) is determined to be the cause of delay in attainment of full power operation...
Code of Federal Regulations, 2011 CFR
2011-01-01
... environmental laws or regulations such as those related to pollution abatement or human health and the... a covered event(s) is determined to be the cause of delay in attainment of full power operation...
Code of Federal Regulations, 2013 CFR
2013-01-01
... environmental laws or regulations such as those related to pollution abatement or human health and the... a covered event(s) is determined to be the cause of delay in attainment of full power operation...
Code of Federal Regulations, 2012 CFR
2012-01-01
... environmental laws or regulations such as those related to pollution abatement or human health and the... a covered event(s) is determined to be the cause of delay in attainment of full power operation...
Ballek, Ondřej; Valečka, Jan; Manning, Jasper; Filipp, Dominik
2015-04-01
The initiation of T-cell receptor (TCR) signaling, based on the cobinding of TCR and CD4-Lck heterodimer to a peptide-major histocompatibility complex II on antigen presenting cells, represents a classical model of T-cell signaling. What is less clear however, is the mechanism which translates TCR engagement to the phosphorylation of immunoreceptor tyrosine-based activation motifs on CD3 chains and how this event is coupled to the delivery of Lck function. Recently proposed 'standby model of Lck' posits that resting T-cells contain an abundant pool of constitutively active Lck (pY394(Lck)) required for TCR triggering, and this amount, upon TCR engagement, remains constant. Here, we show that although maintenance of the limited pool of pY394(Lck) is necessary for the generation of TCR proximal signals in a time-restricted fashion, the total amount of this pool, ~2%, is much smaller than previously reported (~40%). We provide evidence that this dramatic discrepancy in the content of pY394(Lck)is likely the consequence of spontaneous phosphorylation of Lck that occurred after cell solubilization. Additional discrepancies can be accounted for by the sensitivity of different pY394(Lck)-specific antibodies and the type of detergents used. These data suggest that reagents and conditions used for the quantification of signaling parameters must be carefully validated and interpreted. Thus, the limited size of pY394(Lck) pool in primary T-cells invites a discussion regarding the adjustment of the quantitative parameters of the standby model of Lck and reevaluation of the mechanism by which this pool contributes to the generation of proximal TCR signaling.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and upon a new, bona fide credit analysis utilizing current information on financial condition and... means a financial institution that engages in the business of banking; that is recognized as a bank by.... Direct credit substitutes include: (1) Financial standby letters of credit that support financial claims...
Code of Federal Regulations, 2012 CFR
2012-01-01
... and upon a new, bona fide credit analysis utilizing current information on financial condition and... means a financial institution that engages in the business of banking; that is recognized as a bank by.... Direct credit substitutes include: (1) Financial standby letters of credit that support financial claims...
Code of Federal Regulations, 2014 CFR
2014-01-01
... and upon a new, bona fide credit analysis utilizing current information on financial condition and... means a financial institution that engages in the business of banking; that is recognized as a bank by.... Direct credit substitutes include: (1) Financial standby letters of credit that support financial claims...
Code of Federal Regulations, 2012 CFR
2012-07-01
... may be transferred back to the Ready Reserve when the reason for the member's transfer to the Standby... or divinity school cannot be involuntarily called to AD or required to participate in inactive duty... theology or divinity schools. Ready Reservists participating in a military Chaplain Candidate or Theology...
Code of Federal Regulations, 2011 CFR
2011-07-01
... may be transferred back to the Ready Reserve when the reason for the member's transfer to the Standby... or divinity school cannot be involuntarily called to AD or required to participate in inactive duty... theology or divinity schools. Ready Reservists participating in a military Chaplain Candidate or Theology...
Code of Federal Regulations, 2010 CFR
2010-07-01
... may be transferred back to the Ready Reserve when the reason for the member's transfer to the Standby... or divinity school cannot be involuntarily called to AD or required to participate in inactive duty... theology or divinity schools. Ready Reservists participating in a military Chaplain Candidate or Theology...
Code of Federal Regulations, 2013 CFR
2013-07-01
... may be transferred back to the Ready Reserve when the reason for the member's transfer to the Standby... or divinity school cannot be involuntarily called to AD or required to participate in inactive duty... theology or divinity schools. Ready Reservists participating in a military Chaplain Candidate or Theology...
Code of Federal Regulations, 2014 CFR
2014-07-01
... may be transferred back to the Ready Reserve when the reason for the member's transfer to the Standby... or divinity school cannot be involuntarily called to AD or required to participate in inactive duty... theology or divinity schools. Ready Reservists participating in a military Chaplain Candidate or Theology...
Active-standby servovalue/actuator development
NASA Technical Reports Server (NTRS)
Masm, R. K.
1973-01-01
A redundant, fail/operate fail/fixed servoactuator was constructed and tested along with electronic models of a servovalve. It was found that a torque motor switch is satisfactory for the space shuttle main engine hydraulic actuation system, and that this system provides an effective failure monitoring technique.
Vortex servovalve for fluidic or electrical input
NASA Technical Reports Server (NTRS)
Honda, T. S.
1972-01-01
Proportional-pressure control servovalve consisting of fluid amplifier bellows-driven jet-pipe and two vortex valves operating in push-pull, with a pair of bellows for pressure feedback is tolerant to comtaminant particles and meets minimum standby flow requirements for applications such as rocket thruster nozzles.
42 CFR 415.55 - General payment rules.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for reasonable availability services furnished for emergency rooms and the services of standby... § 415.55 General payment rules. (a) Allowable costs. Except as specified otherwise in §§ 413.102 of this chapter (concerning compensation of owners), 415.60 (concerning allocation of physician compensation costs...
42 CFR 415.55 - General payment rules.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for reasonable availability services furnished for emergency rooms and the services of standby... § 415.55 General payment rules. (a) Allowable costs. Except as specified otherwise in §§ 413.102 of this chapter (concerning compensation of owners), 415.60 (concerning allocation of physician compensation costs...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Weight limits. 25.25 Section 25.25 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... requirement is shown, except that for airplanes equipped with standby power rocket engines the maximum weight...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Weight limits. 25.25 Section 25.25 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... requirement is shown, except that for airplanes equipped with standby power rocket engines the maximum weight...
1998 FFTF annual system assessment reports
DOE Office of Scientific and Technical Information (OSTI.GOV)
Guttenberg, S.
The health of FFTF systems was assessed assuming a continued facility standby condition. The review was accomplished in accordance with the guidelines of FFTF-EI-083, Plant Evaluation Program. The attached document includes an executive summary of the significant conclusions and assessment reports for each system evaluated.
47 CFR 90.415 - Prohibited uses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND...) Render a communications common carrier service, except for stations in the Public Safety Pool providing communications standby facilities under § 90.20(a)(2)(xi) and stations licensed under this part in the SMR...
Design of flood early warning system with wifi network based on smartphone
NASA Astrophysics Data System (ADS)
Supani, Ahyar; Andriani, Yuli; Taqwa, Ahmad
2017-11-01
Today, the development using internet of things enables activities surrounding us to be monitored, controlled, predicted and calculated remotely through connections to the internet network such as monitoring activities of long-distance flood warning with information technology. Applying an information technology in the field of flood early warning has been developed in the world, either connected to internet network or not. The internet network that has been done in this paper is the design of WiFi network to access data of rainfall, water level and flood status at any time with a smartphone coming from flood early warning system. The results obtained when test of data accessing with smartphone are in form of rainfall and water level graphs against time and flood status indicators consisting of 3 flood states: Standby 2, Standby 1 and Flood. It is concluded that data are from flood early warning system has been able to accessed and displayed on smartphone via WiFi network in any time and real time.
A Common DPU Platform for ESA JUICE Mission Instruments
NASA Astrophysics Data System (ADS)
Aberg, Martin; Hellstrom, Daniel; Samuelsson, Arne; Torelli, Felice
2016-08-01
This paper describes the resulting hardware and software platform based on GR712RC [1] LEON3-FT that Cobham Gaisler developed in accordance with the common system requirements of the ten scientific instruments on-board the ESA JUICE spacecraft destined the Jupiter system [8].The radiation hardened DPU platform features EDAC protected boot, application memory and working memory of configurable sizes and SpaceWire, FPGA I/O-32/16/8, GPIO, UART and SPI I/O interfaces. The design has undergone PSA, Risk, WCA, Radiation analyses etc. to justify component and design choices resulting in a robust design that can be used in spacecrafts requiring a total dose up to 100krad(Si). The prototype board manufactured uses engineering models of the flight components to ensure that development is representative.Validated boot, standby and driver software accommodates the various DPU platform configurations. The boot performs low-level DPU initialization, standby handles OBC SpaceWire communication and finally the loading and executing of application images typically stored in the non-volatile application memory.
78 FR 42723 - Airworthiness Directives; Pilatus Aircraft Ltd. Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-17
... System (ESIS). If the common ground fails both navigations systems could fail simultaneously, which could... Display (PFD) and the Electronic Standby Instrument System (ESIS). If the common ground fails both navigations systems could fail simultaneously, which could result in loss of control. We are issuing this...
14 CFR 171.49 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... power, either from a power distribution system or locally generated. A determination by the Administrator as to whether a facility will be required to have stand-by power for the localizer, glide slope and monitor accessories to supplement the primary power, will be made for each airport based upon...
14 CFR 171.49 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... power, either from a power distribution system or locally generated. A determination by the Administrator as to whether a facility will be required to have stand-by power for the localizer, glide slope and monitor accessories to supplement the primary power, will be made for each airport based upon...
14 CFR 171.49 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... power, either from a power distribution system or locally generated. A determination by the Administrator as to whether a facility will be required to have stand-by power for the localizer, glide slope and monitor accessories to supplement the primary power, will be made for each airport based upon...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Rule. 218.10 Section 218.10 Energy DEPARTMENT OF ENERGY OIL STANDBY MANDATORY INTERNATIONAL OIL ALLOCATION Supply Orders § 218.10 Rule. (a) Upon the determination by the President that an international energy supply emergency exists, firms engaged in producing...
ERIC Educational Resources Information Center
Keels, Crystal L.
2005-01-01
The plight of graduate assistants in the academy has repeatedly made headlines in recent years. Low pay, long hours, numerous teaching responsibilities and few if any health benefits have led these students to strategize, and in some cases unionize, to improve their working conditions. But many of these teaching assistants have discovered that…
Capital: beyond the tried and true.
Carpenter, Dave
2005-06-01
The old standbys remain by far the financing vehicles of choice for hospitals. But other, less traditional methods are gaining a foothold as not-for-profit hospitals look elsewhere--usually the corporate world--for successful precedents that can help fund big projects without leaving a bad financial aftertaste.
NASA Technical Reports Server (NTRS)
Woolfson, M. G.
1966-01-01
Electrical pulse generator uses power transistors and silicon controlled rectifiers for producing a high current pulse having fast rise and fall times. At quiescent conditions, the standby power consumption of the circuit is equal to zero.
Estimates of ground-water pumpage from the Yakima River Basin aquifer system, Washington, 1960-2000
Vaccaro, J.J.; Sumioka, S.S.
2006-01-01
Ground-water pumpage in the Yakima River Basin, Washington, was estimated for eight categories of use for 1960-2000 as part of an investigation to assess groundwater availability in the basin. Methods used, pumpage estimates, reliability of the estimates, and a comparison with appropriated quantities are described. The eight categories of pumpage were public water supply, self-supplied domestic (exempt wells), irrigation, frost protection, livestock and dairy operations, industrial and commercial, fish and wildlife propagation, and ground-water claims. Pumpage estimates were based on methods that varied by the category and primarily represent pumpage for groundwater rights. Washington State Department of Ecology’s digital database has 2,874 active ground-water rights in the basin that can withdraw an annual quantity of about 529,231 acre-feet during dry years. Irrigation rights are for irrigation of about 129,570 acres. All but 220 of the rights were associated with well drillers’ logs, allowing for a spatial representation of the pumpage. Five-hundred and sixty of the irrigation rights were estimated to be standby/reserve rights. During this study, another 30 rights were identified that were not in the digital database. These rights can withdraw an annual quantity of about 20,969 acre-feet; about 6,700 acre-feet of these rights are near but outside the basin. In 1960, total annual pumpage in the basin, excluding standby/reserve pumpage, was about 115,776 acre-feet. By 2000, total annual pumpage was estimated to be 395,096 acre-feet, and excluding the standby/reserve rights, the total was 312,284 acre-feet. Irrigation accounts for about 60 percent of the pumpage, followed by public water supply at about 12 percent. The smallest category of pumpage was for livestock use with pumpage estimated to be 6,726 acre-feet. Total annual pumpage in 2000 was about 430 cubic feet per second, which is about 11 percent of the surface-water demand. Maximum pumpage is in July and August and during 2000, was about 100 cubic feet per second each month averaged over the Yakima River Basin aquifer system. During 2000, non-standby/reserve pumpage associated with ground-water rights was estimated to total 253,454 acre-feet, or about 198,290 acre-feet less than the appropriated quantity. The unused part of the appropriated value is about equivalent to the irrigation pumpage for primary rights.
NASA Astrophysics Data System (ADS)
Tacke, Kenneth L.
1998-12-01
Primex Aerospace Company, under contract with the U.S. Army Armament Research Development & Engineering Center (ARDEC), has developed a portable vehicle capture system for use at vehicle checkpoints. Currently when a vehicle does not stop at a checkpoint, there are three possible reactions: let the vehicle go unchallenged, pursue the vehicle or stop the vehicle with lethal force. This system provides a non-lethal alternative that will stop and contain the vehicle. The system is completely portable with the heaviest component weighing less than 120 pounds. It can be installed with no external electrical power or permanent anchors required. In its standby mode, the system does not impede normal traffic, but on command erects a barrier in less than 1.5 seconds. System tests have been conducted using 5,100 and 8.400 pound vehicles, traveling at speeds up to 45 mph. The system is designed to minimize vehicle damage and occupant injury, typically resulting in deceleration forces of less than 2.5 gs on the vehicle. According to the drivers involved in tests at 45 mph, the stopping forces feel similar to a panic stop with the vehicle brakes locked. The system is completely reusable and be rapidly reset.
NASA Astrophysics Data System (ADS)
Kish, Laszlo B.; Kwan, Chiman
Weak unclonable function (PUF) encryption key means that the manufacturer of the hardware can clone the key but not anybody else. Strong unclonable function (PUF) encryption key means that even the manufacturer of the hardware is unable to clone the key. In this paper, first we introduce an "ultra" strong PUF with intrinsic dynamical randomness, which is not only unclonable but also gets renewed to an independent key (with fresh randomness) during each use via the unconditionally secure key exchange. The solution utilizes the Kirchhoff-law-Johnson-noise (KLJN) method for dynamical key renewal and a one-time-pad secure key for the challenge/response process. The secure key is stored in a flash memory on the chip to provide tamper-resistance and nonvolatile storage with zero power requirements in standby mode. Simplified PUF keys are shown: a strong PUF utilizing KLJN protocol during the first run and noise-based logic (NBL) hyperspace vector string verification method for the challenge/response during the rest of its life or until it is re-initialized. Finally, the simplest PUF utilizes NBL without KLJN thus it can be cloned by the manufacturer but not by anybody else.
On-Board Event-Based State Estimation for Trajectory Approaching and Tracking of a Vehicle
Martínez-Rey, Miguel; Espinosa, Felipe; Gardel, Alfredo; Santos, Carlos
2015-01-01
For the problem of pose estimation of an autonomous vehicle using networked external sensors, the processing capacity and battery consumption of these sensors, as well as the communication channel load should be optimized. Here, we report an event-based state estimator (EBSE) consisting of an unscented Kalman filter that uses a triggering mechanism based on the estimation error covariance matrix to request measurements from the external sensors. This EBSE generates the events of the estimator module on-board the vehicle and, thus, allows the sensors to remain in stand-by mode until an event is generated. The proposed algorithm requests a measurement every time the estimation distance root mean squared error (DRMS) value, obtained from the estimator's covariance matrix, exceeds a threshold value. This triggering threshold can be adapted to the vehicle's working conditions rendering the estimator even more efficient. An example of the use of the proposed EBSE is given, where the autonomous vehicle must approach and follow a reference trajectory. By making the threshold a function of the distance to the reference location, the estimator can halve the use of the sensors with a negligible deterioration in the performance of the approaching maneuver. PMID:26102489
PRA (Probabilistic Risk Assessment) Applications Program for inspection at Oconee Unit 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gore, B.F.; Vo, T.V.; Harris, M.S.
1987-10-01
The extensive Oconee-3 PRA performed by EPRI has been analyzed to identify plant systems and components important to minimizing public risk, and to identify the primary failure modes of these components. This information has been tabulated, and correlated with inspection modules from the NRC Inspection and Enforcement Manual. The report presents a series of tables, organized by system and prioritized by public risk (in person-rem per year), which identify components associated with 98% of the inspectable risk due to plant operation. External events (earthquakes, tornadoes, fires and floods) are not addressed because inspections cannot directly minimize the risks from thesemore » events; however, flooding caused by the breach of internal systems is addressed. The systems addressed, in descending order of risk importance, are: Reactor Building Spray, R B Cooling, Condenser Circulating Water, Safety Relief Valves, Low Pressure Injection, Standby Shutdown Facility-High Pressure Injection, Low-Pressure Service Water, and Emergency Feedwater. This ranking is based on the Fussel-Vesely measure of risk importance, i.e., the fraction of the total risk which involves failures of the system of interest. 8 refs., 25 tabs.« less
Simulation of load-sharing in standalone distributed generation system
NASA Astrophysics Data System (ADS)
Ajewole, Titus O.; Craven, Robert P. M.; Kayode, Olakunle; Babalola, Olufisayo S.
2018-05-01
This paper presents a study on load-sharing among the component generating units of a multi-source electric microgrid that is operated as an autonomous ac supply-mode system. Emerging trend in power system development permits deployment of microgrids for standalone or stand-by applications, thereby requiring active- and reactive power sharing among the discrete generating units contained in hybrid-source microgrids. In this study, therefore, a laboratory-scale model of a microgrid energized with three renewable energy-based sources is employed as a simulation platform to investigate power sharing among the power-generating units. Each source is represented by a source emulator that captures the real operational characteristics of the mimicked generating unit and, with implementation of real-life weather data and load profiles on the model; the sharing of the load among the generating units is investigated. There is a proportionate generation of power by the three source emulators, with their frequencies perfectly synchronized at the point of common coupling as a result of balance flow of power among them. This hybrid topology of renewable energy-based microgrid could therefore be seamlessly adapted into national energy mix by the indigenous electric utility providers in Nigeria.
NASA Astrophysics Data System (ADS)
Ma, Yitao; Miura, Sadahiko; Honjo, Hiroaki; Ikeda, Shoji; Hanyu, Takahiro; Ohno, Hideo; Endoh, Tetsuo
2017-04-01
A high-density nonvolatile associative memory (NV-AM) based on spin transfer torque magnetoresistive random access memory (STT-MRAM), which achieves highly concurrent and ultralow-power nearest neighbor search with full adaptivity of the template data format, has been proposed and fabricated using the 90 nm CMOS/70 nm perpendicular-magnetic-tunnel-junction hybrid process. A truly compact current-mode circuitry is developed to realize flexibly controllable and high-parallel similarity evaluation, which makes the NV-AM adaptable to any dimensionality and component-bit of template data. A compact dual-stage time-domain minimum searching circuit is also developed, which can freely extend the system for more template data by connecting multiple NM-AM cores without additional circuits for integrated processing. Both the embedded STT-MRAM module and the computing circuit modules in this NV-AM chip are synchronously power-gated to completely eliminate standby power and maximally reduce operation power by only activating the currently accessed circuit blocks. The operations of a prototype chip at 40 MHz are demonstrated by measurement. The average operation power is only 130 µW, and the circuit density is less than 11 µm2/bit. Compared with the latest conventional works in both volatile and nonvolatile approaches, more than 31.3% circuit area reductions and 99.2% power improvements are achieved, respectively. Further power performance analyses are discussed, which verify the special superiority of the proposed NV-AM in low-power and large-memory-based VLSIs.
78 FR 58874 - Airworthiness Directives; PILATUS AIRCRAFT LTD. Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-25
... System (ESIS). If the common ground fails both navigations systems could fail simultaneously, which could... flight display (PFD) and the Electronic Standby Instrument System (ESIS). If the common ground fails both navigation systems could fail simultaneously. We are issuing this AD to prevent simultaneous failure of both...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Review. 218.32 Section 218.32 Energy DEPARTMENT OF ENERGY OIL STANDBY MANDATORY INTERNATIONAL OIL ALLOCATION Procedures § 218.32 Review. (a) Purpose and scope. This subpart establishes the procedures for the filing of an application for review of a supply order...
12 CFR Appendix C to Part 704 - Risk-Based Capital Credit Risk-Weight Categories
Code of Federal Regulations, 2011 CFR
2011-01-01
... corporate credit union must compute its risk-weighted assets for purposes of determining its capital ratios.... Depository institution means a financial institution that engages in the business of providing financial... substitute. Direct credit substitutes include: (1) Financial standby letters of credit that support financial...
47 CFR 74.432 - Licensing requirements and procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... authorized to establish standby circuits from places where official broadcasts may be made during times of... unattended in accordance with the following: (1) The station must be designed, installed, and protected so...) In cases where a series of broadcasts are to be made from the same location, portable or mobile...
47 CFR 74.432 - Licensing requirements and procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... authorized to establish standby circuits from places where official broadcasts may be made during times of... unattended in accordance with the following: (1) The station must be designed, installed, and protected so...) In cases where a series of broadcasts are to be made from the same location, portable or mobile...
47 CFR 74.432 - Licensing requirements and procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... authorized to establish standby circuits from places where official broadcasts may be made during times of... unattended in accordance with the following: (1) The station must be designed, installed, and protected so...) In cases where a series of broadcasts are to be made from the same location, portable or mobile...
47 CFR 74.432 - Licensing requirements and procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... authorized to establish standby circuits from places where official broadcasts may be made during times of... unattended in accordance with the following: (1) The station must be designed, installed, and protected so...) In cases where a series of broadcasts are to be made from the same location, portable or mobile...
30 CFR 23.7 - Specific requirements for approval.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS TELEPHONES AND SIGNALING DEVICES § 23.7 Specific requirements for... apply. (g) Line powered telephones and signaling devices or systems shall be equipped with standby power... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Specific requirements for approval. 23.7...
30 CFR 23.7 - Specific requirements for approval.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS TELEPHONES AND SIGNALING DEVICES § 23.7 Specific requirements for... apply. (g) Line powered telephones and signaling devices or systems shall be equipped with standby power... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Specific requirements for approval. 23.7...
30 CFR 23.7 - Specific requirements for approval.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., EVALUATION, AND APPROVAL OF MINING PRODUCTS TELEPHONES AND SIGNALING DEVICES § 23.7 Specific requirements for... apply. (g) Line powered telephones and signaling devices or systems shall be equipped with standby power... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Specific requirements for approval. 23.7...
41 CFR 109-1.5104 - Borrowing of personal property.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-INTRODUCTION 1.51-Personal Property Management Standards and Practices § 109-1.5104 Borrowing of personal... as In Standby should be reviewed by those receiving availability inquiries for short-term use (one... when required for short periods of time. Such transactions shall be covered by written agreements which...
Learn about the EPA guide (Selected Analytical Methods for Environmental Remediation and Recovery) that helps labs around the country quickly select the appropriate environmental testing and analysis methods to use after a wide-scale chemical event
20 CFR 332.3 - Mileage and work restrictions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Mileage and work restrictions. 332.3 Section 332.3 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.3 Mileage and work...
20 CFR 332.4 - Restrictions in extra service.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Restrictions in extra service. 332.4 Section 332.4 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.4 Restrictions in extra...
75 FR 41838 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-19
... Institutional Coal Users;'' EIA-4, ``Weekly Coal Monitoring Report--Coke Plants'' (Standby); EIA-5, ``Quarterly Coal Consumption and Quality Report--Coke Plants;'' EIA-6Q (Schedule Q), ``Quarterly Coal Report... Coal Consumption and Quality Report--Coke Plants) EIA proposes to make changes to the Form EIA-5 survey...
Standby Power Management Architecture for Deep-Submicron Systems
2006-05-19
Driver 61 5.1 Quark PicoNode System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 5.2 Power Domain Architecture... Quark system protocol stack. . . . . . . . . . . . . . . . . . . . . . . . . . . 62 5.2 Quark system block diagram...the implementation of the chip using an industry-standard place and route design flow. Lastly some measurements from the chip are presented. 5.1 Quark
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
The report presents results of a Phase I test of emissions packing technology offered by France Compressor Products which is designed to reduce methane leaks from compressor rod packing when a compressor is in a standby and pressurized state. This Phase I test was executed betwee...
USDA-ARS?s Scientific Manuscript database
Tobacco mosaic virus (TMV) and four other tobamoviruses infected multiple petunia cultivars without producing obvious viral symptoms. A single cutting event on a TMV-infected plant was sufficient for transmission to many plants subsequently cut with the same clippers. A number of 'old standbys' an...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Pricing. 218.12 Section 218.12 Energy DEPARTMENT OF ENERGY OIL STANDBY MANDATORY INTERNATIONAL OIL ALLOCATION Supply Orders § 218.12 Pricing. The price for oil subject to a supply order issued pursuant to this subpart shall be based on the price conditions...
77 FR 75402 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... ``BAT'' position, isolating the battery and standby buses, disabling the battery charger, and eventually causing the main battery to be depleted. This proposed AD would require doing wiring changes and installing a new air/ground relay to the battery charger system. We are proposing this AD to prevent...
78 FR 72564 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... switch to the ``BAT'' position, isolating the battery and standby buses, disabling the battery charger, and eventually causing the main battery to be depleted. This AD requires doing wiring changes and installing a new air/ground relay to the battery charger system. We are issuing this AD to prevent discharge...
7 CFR 75.42 - Sampling and sealing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... for sampling and sealing shall include the time for actual sampling and sealing, standby at the service site, travel time and actual travel costs to and from the site, and a per diem charge if the employee performing the service is paid per diem in accordance with existing travel regulations as appear...
7 CFR 75.42 - Sampling and sealing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... for sampling and sealing shall include the time for actual sampling and sealing, standby at the service site, travel time and actual travel costs to and from the site, and a per diem charge if the employee performing the service is paid per diem in accordance with existing travel regulations as appear...
7 CFR 75.42 - Sampling and sealing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... for sampling and sealing shall include the time for actual sampling and sealing, standby at the service site, travel time and actual travel costs to and from the site, and a per diem charge if the employee performing the service is paid per diem in accordance with existing travel regulations as appear...
7 CFR 75.42 - Sampling and sealing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... for sampling and sealing shall include the time for actual sampling and sealing, standby at the service site, travel time and actual travel costs to and from the site, and a per diem charge if the employee performing the service is paid per diem in accordance with existing travel regulations as appear...
7 CFR 75.42 - Sampling and sealing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... for sampling and sealing shall include the time for actual sampling and sealing, standby at the service site, travel time and actual travel costs to and from the site, and a per diem charge if the employee performing the service is paid per diem in accordance with existing travel regulations as appear...
10 CFR 950.10 - Conditional agreement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Conditional agreement. 950.10 Section 950.10 Energy....10 Conditional agreement. (a) Purpose. The Department and a sponsor may enter into a Conditional Agreement. The Department will enter into a Standby Support Contract with the first six sponsors to satisfy...
10 CFR 950.10 - Conditional agreement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Conditional agreement. 950.10 Section 950.10 Energy....10 Conditional agreement. (a) Purpose. The Department and a sponsor may enter into a Conditional Agreement. The Department will enter into a Standby Support Contract with the first six sponsors to satisfy...
10 CFR 950.41 - Monitoring/Auditing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Monitoring/Auditing. 950.41 Section 950.41 Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Audit and Investigations and Other Provisions § 950.41 Monitoring/Auditing. The Department has the right to audit any and all costs associated...
Low-power integrated-circuit driver for ferrite-memory word lines
NASA Technical Reports Server (NTRS)
Katz, S.
1970-01-01
Composite circuit uses both n-p-n bipolar and p-channel MOS transistors /BIMOS/. The BIMOS driver provides 1/ ease of integrated circuit construction, 2/ low standby power consumption, 3/ bidirectional current pulses, and 4/ current-pulse amplitudes and rise times independent of active device parameters.
The African Standby Force: A Premature Enterprise Dictated by Circumstances?
2011-03-23
offer specialized units that may be useful, but would not normally form part of a brigade group. To cater for this, the AU should include them in...also contracted African commercial airlines such as Kenya Airways or Ethiopia Airlines or other foreign companies to deploy and redeploy its
Power increase at first ProCure21 project.
2007-06-01
Throughout the UK, hospitals are embarking on new-build programmes to meet the needs of growing communities. However, site acreage and accommodation are often already under pressure, as Dale Power Solutions found when it was commissioned to increase standby power availability at the Friarage Hospital in Northallerton, North Yorkshire.
12 CFR 956.5 - Authorization for derivative contracts and other transactions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Authorization for derivative contracts and... for derivative contracts and other transactions. A Bank may enter into the following types of transactions: (a) Derivative contracts; (b) Standby letters of credit, pursuant to the requirements of part 960...
12 CFR 956.5 - Authorization for derivative contracts and other transactions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Authorization for derivative contracts and... for derivative contracts and other transactions. A Bank may enter into the following types of transactions: (a) Derivative contracts; (b) Standby letters of credit, pursuant to the requirements of part 960...
77 FR 39745 - Fuel Oil Systems for Emergency Power Supplies
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-05
... fuel oil systems for safety-related emergency diesel generators and oil-fueled gas turbine generators... emergency diesel generators and oil-fueled gas turbine generators, including assurance of adequate fuel oil.... The DG-1282 is proposed revision 2 of Regulatory Guide 1.137, ``Fuel Oil Systems for Standby Diesel...
10 CFR 950.34 - Final claim determination.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Final claim determination. 950.34 Section 950.34 Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Dispute Resolution Process § 950.34 Final claim determination. (a) If the parties reach a Final Claim Determination through mediation, or...
10 CFR 950.34 - Final claim determination.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Final claim determination. 950.34 Section 950.34 Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Dispute Resolution Process § 950.34 Final claim determination. (a) If the parties reach a Final Claim Determination through mediation, or...
10 CFR 950.21 - Notification of covered event.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...
10 CFR 950.21 - Notification of covered event.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...
10 CFR 950.21 - Notification of covered event.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...
10 CFR 950.21 - Notification of covered event.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Claims Administration Process § 950.21 Notification of covered event. (a) A sponsor shall submit in writing to the Claims Administrator a notification that a covered event has occurred that has delayed the schedule for construction or...
77 FR 58971 - Airworthiness Directives; Eurocopter France (Eurocopter) Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-25
... prompted by flight crew reports of deviations between the displayed attitude on the attitude display screen and the independent electromechanical standby attitude indicator. The proposed actions [[Page 58972... helicopters. EASA advises that a slow drift in the roll axis on the pilot's and co-pilot's attitude display...
78 FR 20234 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-04
... prompted by flight crew reports of deviations between the displayed attitude on the attitude display screen and the independent electromechanical standby attitude indicator. The actions of this AD are intended... helicopters. EASA advises that a slow drift in the roll axis on the pilot's and co-pilot's attitude display...
41 CFR 109-43.5002 - Reviews to determine need for retaining items.
Code of Federal Regulations, 2010 CFR
2010-07-01
... REGULATIONS UTILIZATION AND DISPOSAL 43-UTILIZATION OF PERSONAL PROPERTY 43.50-Utilization of Personal.... Procedures and practices shall require an initial review at the time the plant is placed in standby to... special reviews when a change in start-up time is made or when circumstances warrant. Such procedures...
41 CFR 109-43.5002 - Reviews to determine need for retaining items.
Code of Federal Regulations, 2011 CFR
2011-01-01
... REGULATIONS UTILIZATION AND DISPOSAL 43-UTILIZATION OF PERSONAL PROPERTY 43.50-Utilization of Personal.... Procedures and practices shall require an initial review at the time the plant is placed in standby to... special reviews when a change in start-up time is made or when circumstances warrant. Such procedures...
24 CFR 3280.707 - Heat producing appliances.
Code of Federal Regulations, 2014 CFR
2014-04-01
... have a flue loss of not more than 25 percent, and a thermal efficiency of not less than that specified... efficiency. (1) All automatic electric storage water heaters installed in manufactured homes shall have a standby loss not exceeding 43 watts/meter2 (4 watts/ft2) of tank surface area. The method of test for...
46 CFR 153.432 - Cooling systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Cooling systems. 153.432 Section 153.432 Shipping COAST... Control Systems § 153.432 Cooling systems. (a) Each cargo cooling system must have an equivalent standby... cooling system. (b) Each tankship that has a cargo tank with a required cooling system must have a manual...
46 CFR 153.432 - Cooling systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Cooling systems. 153.432 Section 153.432 Shipping COAST... Control Systems § 153.432 Cooling systems. (a) Each cargo cooling system must have an equivalent standby... cooling system. (b) Each tankship that has a cargo tank with a required cooling system must have a manual...
46 CFR 153.432 - Cooling systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Cooling systems. 153.432 Section 153.432 Shipping COAST... Control Systems § 153.432 Cooling systems. (a) Each cargo cooling system must have an equivalent standby... cooling system. (b) Each tankship that has a cargo tank with a required cooling system must have a manual...
On Standby? A Comparison of Online and Offline Witnesses to Bullying and Their Bystander Behaviour
ERIC Educational Resources Information Center
Quirk, Roslynn; Campbell, Marilyn
2015-01-01
Given their ubiquitous presence as witnesses to school-yard bullying, the role of the "bystander" has been studied extensively. The prevalence and behaviour of bystanders to "cyberbullying," however, is less understood. In an anonymous, school-based questionnaire, 716 secondary school students from South-East Queensland…
12 CFR 337.2 - Standby letters of credit.
Code of Federal Regulations, 2010 CFR
2010-01-01
... repay money borrowed by or advanced to or for the account of the account party, or (2) to make payment... obligation. 1 The term similar arrangement includes the creation of an acceptance or similar undertaking. 1... issuer, which do not “guaranty” payment of a money obligation of the account party and which do not...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-17
... fossil fuel as applicable to a given water heater. Specifically, the standby loss testing in the existing... important to note that fossil-fueled direct heating equipment and pool heaters typically consume both fossil... procedures for direct heating equipment, fossil-fuel energy consumption is accounted for comprehensively over...
10 CFR 434.404 - Building service systems and equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ratio Btuh/gal Test Method a Energy factor Thermal efficiency Et% Standby loss %/HR NAECA all electric... Loss. (a) When testing an electric storage water heater, the procedures of Z21.10.3-1990 (RS-39... manufacturer with smoke no greater than 1 and the fuel pump pressure within ±1% of the manufacturer's...
10 CFR 434.404 - Building service systems and equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ratio Btuh/gal Test Method a Energy factor Thermal efficiency Et% Standby loss %/HR NAECA all electric... Loss. (a) When testing an electric storage water heater, the procedures of Z21.10.3-1990 (RS-39... manufacturer with smoke no greater than 1 and the fuel pump pressure within ±1% of the manufacturer's...
10 CFR 434.404 - Building service systems and equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ratio Btuh/gal Test Method a Energy factor Thermal efficiency Et% Standby loss %/HR NAECA all electric... Loss. (a) When testing an electric storage water heater, the procedures of Z21.10.3-1990 (RS-39... manufacturer with smoke no greater than 1 and the fuel pump pressure within ±1% of the manufacturer's...
10 CFR 434.404 - Building service systems and equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ratio Btuh/gal Test Method a Energy factor Thermal efficiency Et% Standby loss %/HR NAECA all electric... Loss. (a) When testing an electric storage water heater, the procedures of Z21.10.3-1990 (RS-39... manufacturer with smoke no greater than 1 and the fuel pump pressure within ±1% of the manufacturer's...
The settlement also requires the establishment of a $4.5 million letter of credit and a standby trust that will guarantee sufficient funding for, and a mechanism to accomplish, compliance with the Clean Water Act and the work the companies.
It's Hard Saying Goodbye to an Old Flame
ERIC Educational Resources Information Center
Roy, Ken
2004-01-01
As heat sources go, the old standby for elementary and middle school science laboratories has been the centuries old alcohol lamp. Unfortunately, this inexpensive heat producer has been a continuous source of accidents--many of which are relatively serious. Hot plates are emerging as the most popular source of heat for science experiments. The…
20 CFR 332.3 - Mileage and work restrictions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Mileage and work restrictions. 332.3 Section... INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.3 Mileage and work... solely because of the application to him of a mileage or work restriction agreed upon in a written...
Will the Establishment of USAFRICOM Compliment or Compete with African Standby Force
2010-01-01
Analysis, 3 May. Available at <www.cfr.org/publication/ 13255 />. Accessed on 21 September 2009. 29 Malan, Mark (2007) ‗AFRICOM: A Wolf in Sheep‘s...publication/ 13255 />. Malan, Mark (2007) ‗AFRICOM: A Wolf in Sheep‘s Clothing‘, Testimony by Mark Malan, Refugees International, before the
32 CFR 584.6 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2013 CFR
2013-07-01
... units under his or her control. (See AR 140-1, para 1-6.) (iii) Commander, RCPAC for nonunit members assigned to Control Groups of the Ready Reserve, Standby Reserve, and Retired Reserve. (3) The officials... delivery. (ii) That the military department does not control the personal affairs of nonactive duty...
32 CFR 584.6 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2010 CFR
2010-07-01
... under his or her control. (See AR 140-1, para 1-6.) (iii) Commander, RCPAC for nonunit members assigned to Control Groups of the Ready Reserve, Standby Reserve, and Retired Reserve. (3) The officials cited... delivery. (ii) That the military department does not control the personal affairs of nonactive duty...
32 CFR 513.5 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2010 CFR
2010-07-01
... commander concerned for Ready Reservists assigned to troop program units under their control. (See AR 140-1, para 1-6.) (iii) ARPERCEN for nonunit soldiers assigned to Control Groups of the Ready Reserve, Standby... method of delivery. (ii) That the military department does not control the personal affairs of nonactive...
32 CFR 584.6 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2011 CFR
2011-07-01
... under his or her control. (See AR 140-1, para 1-6.) (iii) Commander, RCPAC for nonunit members assigned to Control Groups of the Ready Reserve, Standby Reserve, and Retired Reserve. (3) The officials cited... delivery. (ii) That the military department does not control the personal affairs of nonactive duty...
32 CFR 513.5 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2012 CFR
2012-07-01
... commander concerned for Ready Reservists assigned to troop program units under their control. (See AR 140-1, para 1-6.) (iii) ARPERCEN for nonunit soldiers assigned to Control Groups of the Ready Reserve, Standby... method of delivery. (ii) That the military department does not control the personal affairs of nonactive...
32 CFR 584.6 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2014 CFR
2014-07-01
... units under his or her control. (See AR 140-1, para 1-6.) (iii) Commander, RCPAC for nonunit members assigned to Control Groups of the Ready Reserve, Standby Reserve, and Retired Reserve. (3) The officials... delivery. (ii) That the military department does not control the personal affairs of nonactive duty...
32 CFR 584.6 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2012 CFR
2012-07-01
... under his or her control. (See AR 140-1, para 1-6.) (iii) Commander, RCPAC for nonunit members assigned to Control Groups of the Ready Reserve, Standby Reserve, and Retired Reserve. (3) The officials cited... delivery. (ii) That the military department does not control the personal affairs of nonactive duty...
32 CFR 513.5 - Procedures governing nonactive duty or discharged personnel.
Code of Federal Regulations, 2011 CFR
2011-07-01
... commander concerned for Ready Reservists assigned to troop program units under their control. (See AR 140-1, para 1-6.) (iii) ARPERCEN for nonunit soldiers assigned to Control Groups of the Ready Reserve, Standby... method of delivery. (ii) That the military department does not control the personal affairs of nonactive...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 89.406 - Pre-test procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Pre-test procedures. 89.406 Section 89...) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Exhaust Emission Test Procedures § 89.406 Pre-test procedures. (a) Allow a minimum of 30 minutes warmup in the standby or operating...
40 CFR 265.147 - Liability requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... pursuant to a draft by the trustee of the standby trust will be deposited by the issuing institution into... this section. (5) An owner or operator may meet the requirements of this section by obtaining a trust..., guarantee, letter of credit, surety bond, and trust fund, except that the owner or operator may not combine...
40 CFR 264.147 - Liability requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... pursuant to a draft by the trustee of the standby trust will be deposited by the issuing institution into... operator may meet the requirements of this section by obtaining a trust fund for liability coverage as... bond, and trust fund, except that the owner or operator may not combine a financial test covering part...
10 CFR 218.11 - Supply orders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Supply orders. 218.11 Section 218.11 Energy DEPARTMENT OF ENERGY OIL STANDBY MANDATORY INTERNATIONAL OIL ALLOCATION Supply Orders § 218.11 Supply orders. (a) A supply order shall require that the firm to which it is issued take actions specified therein relating to...
46 CFR 153.432 - Cooling systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Cooling systems. 153.432 Section 153.432 Shipping COAST... Control Systems § 153.432 Cooling systems. (a) Each cargo cooling system must have an equivalent standby... cooling system. (b) Each tankship that has a cargo tank with a required cooling system must have a manual...
46 CFR 38.05-25 - Refrigerated systems-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... atmospheric temperature under the requirements of § 38.05-3(f) or § 38.05-4, maintenance of the tank pressure below the maximum allowable pressure shall be provided by one or more of the following means: (1) A refrigeration or liquefication system which regulates the pressure in the tanks. A standby compressor or...
10 CFR 950.37 - Final agreement or final decision.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Final agreement or final decision. 950.37 Section 950.37 Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Dispute Resolution Process § 950.37 Final agreement or final decision. (a) If the parties reach a Final Agreement on a contract...
Emergency power for fish produced in intensive, pond-based systems
USDA-ARS?s Scientific Manuscript database
Power failure in a heavily stocked and fed pond-based culture system can result in massive fish losses within minutes. Even in a conventional pond with a stand-by tractor powered aerator, the shock of a sudden loss of power can dramatically affect production resulting in mortalities and reduced perf...
12 CFR 225.44 - Reporting of stock loans.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., including an endorsement or standby letter of credit; and any other type of transaction that extends credit... that has credit outstanding to any person or group of persons, in the aggregate, which is secured... section 1(b) of the International Banking Act of 1978 (12 U.S.C. 3101). (2) Credit outstanding includes...
Survey of forensic mental health experts on pro se competence after Indiana v. Edwards.
Kaufman, Andrew R; Knoll, James L; Way, Bruce B; Leonard, Cecilia; Widroff, Jacob
2011-01-01
In Indiana v. Edwards (2008) the U.S. Supreme Court held that a higher standard may be required for pro se competence (PSC) than for competence to stand trial (CST), but provided little guidance for the trial court judge. This survey of forensic mental health experts studied potential PSC criteria. Sixty-eight (22.7%) forensic evaluators replied. Three McGarry criteria were reported as requiring a much higher standard for PSC: to appraise the available legal defenses (45.6%), to plan a legal strategy (51.5%), and to question and challenge witnesses (44.1%). Sixty percent agreed that standby counsel should be mandatory. Respondents opined that average abilities were sufficient for intelligence (77.9%), literacy (69.1%), and verbal ability (70.6%) were sufficient. PSC examiners may wish to assess appraisal of available legal defenses, planning a legal strategy, and questioning and challenging witnesses for a higher standard than CST. Evaluators should also assess the defendant's willingness to accept standby counsel (SBC) and the defendant's motivation for attempting a pro se defense.
A Statistical Simulation Approach to Safe Life Fatigue Analysis of Redundant Metallic Components
NASA Technical Reports Server (NTRS)
Matthews, William T.; Neal, Donald M.
1997-01-01
This paper introduces a dual active load path fail-safe fatigue design concept analyzed by Monte Carlo simulation. The concept utilizes the inherent fatigue life differences between selected pairs of components for an active dual path system, enhanced by a stress level bias in one component. The design is applied to a baseline design; a safe life fatigue problem studied in an American Helicopter Society (AHS) round robin. The dual active path design is compared with a two-element standby fail-safe system and the baseline design for life at specified reliability levels and weight. The sensitivity of life estimates for both the baseline and fail-safe designs was examined by considering normal and Weibull distribution laws and coefficient of variation levels. Results showed that the biased dual path system lifetimes, for both the first element failure and residual life, were much greater than for standby systems. The sensitivity of the residual life-weight relationship was not excessive at reliability levels up to R = 0.9999 and the weight penalty was small. The sensitivity of life estimates increases dramatically at higher reliability levels.
Funston, Wendy; Howard, Simon J
2016-01-01
Objectives. The primary objective of this study was to assess the rules governing secondary school pupils' carriage of inhalers for emergency treatment of asthma in the North East of England. Design. This study was based upon a postal questionnaire survey. Setting. The setting for this study was mainstream free-to-attend secondary schools which admit 16 year old pupils within the 12 Local Authority areas which make up the North East of England. Participants. All 153 schools meeting the inclusion criteria were invited to participate in the study, of which 106 (69%) took part. Main Outcome Measures. Our three main outcome measures were: whether pupils are permitted to carry inhalers on their person while at school; whether advance permission is required for pupils to carry inhalers, and from whom; and whether the school has an emergency 'standby' salbutamol inhaler for use in asthma emergencies, as permitted since October 2014 under recent amendments to The Human Medicines Regulations 2012. Results. Of 98 schools submitting valid responses to the question, 99% (n = 97) permitted pupils to carry inhalers on their person while at school; the remaining school stored pupils' inhalers in a central location within the school. A total of 22% of included schools (n = 22) required parental permission before pupils were permitted to carry inhalers. Of 102 schools submitting valid responses to the question, 44% (n = 45) had purchased a 'standby' salbutamol inhaler for use in asthma emergencies. Conclusions. Most secondary schools in North East England permit pupils to carry inhalers on their person. The requirement in a minority of schools for parental permission to be given possibly contravenes the standard ethical practices in clinical medicine for children of this age. Only a minority of schools hold a 'standby' salbutamol inhaler for use in asthma emergencies. Wider availability may improve outcomes for asthma emergencies occurring in schools.
BPM Motors in Residential Gas Furnaces: What are theSavings?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lutz, James; Franco, Victor; Lekov, Alex
2006-05-12
Residential gas furnaces contain blowers to distribute warm air. Currently, furnace blowers use either a Permanent Split Capacitor (PSC) or a Brushless Permanent Magnet (BPM) motor. Blowers account for the majority of furnace electricity consumption. Therefore, accurate determination of the blower electricity consumption is important for understanding electricity consumption of furnaces. The electricity consumption of blower motors depends on the static pressure across the blower. This paper examines both types of blower motors in non-condensing non-weatherized gas furnaces at a range of static pressures. Fan performance data is based on manufacturer product literature and laboratory tests. We use field-measured staticmore » pressure in ducts to get typical system curves to calculate how furnaces would operate in the field. We contrast this with the electricity consumption of a furnace blower operating under the DOE test procedure and manufacturer rated conditions. Furnace electricity use is also affected by operating modes that happen at the beginning and end of each furnace firing cycle. These operating modes are the pre-purge and post-purge by the draft inducer, the on-delay and off-delay of the blower, and the hot surface ignitor operation. To accurately calculate this effect, we use the number of firing cycles in a typical California house in the Central Valley of California. Cooling hours are not considered in the DOE test procedure. We also account for furnace blower use by the air conditioner and stand-by power. Overall BPM motors outperform PSC motors, but the total electricity savings are significantly less than projected using the DOE test procedure conditions. The performance gains depend on the static pressure of the household ducts, which are typically much higher than in the test procedures.« less
ERIC Educational Resources Information Center
Briggs, Linda L.
2013-01-01
When it comes to secure testing online, even high-tech solutions rely on an old standby: a human proctor. This article asks the question: Is such an approach sustainable in the long run? A student labors over a midterm exam while a vigilant proctor peers over his shoulder, watching for any sign of cheating. It sounds like a tableau from a century…
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
Code of Federal Regulations, 2010 CFR
2010-01-01
... include a provision setting forth the type of events that are covered events under the contract. The type...) Litigation in State, Federal, local, or tribal courts, including appeals of Commission decisions related to..., including but not limited to the following types of events: (i) The sponsor's failure to comply with...
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2011 CFR
2011-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
9. Photographic copy of construction drawing, dated October 29, 1958, ...
9. Photographic copy of construction drawing, dated October 29, 1958, Giffels and Rossetti, Architects-Engineers, Detroit, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. STANDBY POWER UNIT, ARCHITECTURAL, ADDITION TO BLDG, 853, SHEET 3 OF 12. - Selfridge Field, Building No. 853, North of Taxiway H, east of North-South Runway, Mount Clemens, Macomb County, MI
5. Photographic copy of construction drawing, dated October 29, 1958, ...
5. Photographic copy of construction drawing, dated October 29, 1958, Giffels & Rossetti, Detroit, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. STANDBY GENERATOR BUILDING, ARCHITECTURAL; PLAN, ELEVATIONS, SECTION, SHEET 2 OF 12, DRAWING NO. SLF-800-045. - Selfridge Field, Building No. 98, South of East Ramp, east of Taxiway F, Mount Clemens, Macomb County, MI
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2014 CFR
2014-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2012 CFR
2012-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.
Code of Federal Regulations, 2013 CFR
2013-07-01
... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...
40 CFR 86.1111-87 - Test procedures for PCA testing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... supply to the chemiluminescent analyzers is placed in the standby position.] (B) The manufacturer shall... manufacturer shall inspect the fuel system to insure the absence of any leaks of liquid or vapor to the atmosphere by applying a pressure of 14.5 ±0.5 inches of water to the fuel system, allowing the pressure to...
40 CFR 86.608-98 - Test procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... voltage supply to the chemiluminescent analyzers is placed in the standby position.) (B) The manufacturer... system to ensure the absence of any leaks of liquid or vapor to the atmosphere by applying a pressure of 14.5±0.5 inches of water (3.6±0.1 Kpa) to the fuel system allowing the pressure to stabilize and...
Disaster Response Regional Architectures: Assessing Future Possibilities
2017-09-01
as avian influenza and Severe Acute Respiratory Syndrome (SARS), cybersecurity, and disaster management (Jackson, 2015). Since its inception in...Asian Association for Regional Cooperation SAR Search and Rescue SARRND SAARC Agreement on Rapid Response to Natural Disasters SARS Severe Acute ...Respiratory Syndrome SASOP Standard Operating Procedures for Regional Standby Arrangements and Coordination of Joint Disaster Relief and Emergency Response
Programmed Controls for an All-Electric School.
ERIC Educational Resources Information Center
Novak, W.J.
1965-01-01
Heating and ventilating equipment used in the all-electric upper Elementary School in Bedford, New Hampshire, is controlled to insure optimum comfort while the school is occupied and optimum economy of standby operation while it is not in use. A master clock programs all control functions while its mechanism drives two types of tapes--(1) a 365…
Reliability computation using fault tree analysis
NASA Technical Reports Server (NTRS)
Chelson, P. O.
1971-01-01
A method is presented for calculating event probabilities from an arbitrary fault tree. The method includes an analytical derivation of the system equation and is not a simulation program. The method can handle systems that incorporate standby redundancy and it uses conditional probabilities for computing fault trees where the same basic failure appears in more than one fault path.
Development and Analysis of Models for Handling the Refrigerated Containerized Cargoes
NASA Astrophysics Data System (ADS)
Nyrkov, A.; Pavlova, L.; Nikiforov, V.; Sokolov, S.; Budnik, V.
2017-07-01
This paper considers the open multi-channel queuing system, which receives irregular homogeneous or heterogeneous applications with an unlimited flow of standby time. The system is regarded as an example of a container terminal, having conditionally functional sections with a certain duty cycle, which receives an irregular, non-uniform flow of vessels with the resultant intensity.
20 CFR 332.5 - Equivalent of full-time work.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Equivalent of full-time work. 332.5 Section... INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.5 Equivalent of full-time work. An employee who has the equivalent of full-time work with respect to service on days within a...
20 CFR 332.5 - Equivalent of full-time work.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true Equivalent of full-time work. 332.5 Section... INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.5 Equivalent of full-time work. An employee who has the equivalent of full-time work with respect to service on days within a...
20 CFR 332.5 - Equivalent of full-time work.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Equivalent of full-time work. 332.5 Section... INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.5 Equivalent of full-time work. An employee who has the equivalent of full-time work with respect to service on days within a...
20 CFR 332.5 - Equivalent of full-time work.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Equivalent of full-time work. 332.5 Section... INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.5 Equivalent of full-time work. An employee who has the equivalent of full-time work with respect to service on days within a...
20 CFR 332.5 - Equivalent of full-time work.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false Equivalent of full-time work. 332.5 Section... INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY-OVER RULES § 332.5 Equivalent of full-time work. An employee who has the equivalent of full-time work with respect to service on days within a...
5 CFR 550.143 - Bases for determining positions for which premium pay under § 550.141 is authorized.
Code of Federal Regulations, 2014 CFR
2014-01-01
... premium pay under § 550.141 is authorized. 550.143 Section 550.143 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Premium Pay Regularly Scheduled Standby Duty Pay § 550.143 Bases for determining positions for which premium pay under § 550.141 is...
5 CFR 550.143 - Bases for determining positions for which premium pay under § 550.141 is authorized.
Code of Federal Regulations, 2012 CFR
2012-01-01
... premium pay under § 550.141 is authorized. 550.143 Section 550.143 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Premium Pay Regularly Scheduled Standby Duty Pay § 550.143 Bases for determining positions for which premium pay under § 550.141 is...
5 CFR 550.143 - Bases for determining positions for which premium pay under § 550.141 is authorized.
Code of Federal Regulations, 2013 CFR
2013-01-01
... premium pay under § 550.141 is authorized. 550.143 Section 550.143 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Premium Pay Regularly Scheduled Standby Duty Pay § 550.143 Bases for determining positions for which premium pay under § 550.141 is...
14 CFR Appendix E to Part 25 - Appendix E to Part 25
Code of Federal Regulations, 2013 CFR
2013-01-01
... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...
14 CFR Appendix E to Part 25 - Appendix E to Part 25
Code of Federal Regulations, 2011 CFR
2011-01-01
... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...
14 CFR Appendix E to Part 25 - Appendix E to Part 25
Code of Federal Regulations, 2014 CFR
2014-01-01
... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...
14 CFR Appendix E to Part 25 - Appendix E to Part 25
Code of Federal Regulations, 2012 CFR
2012-01-01
... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...
14 CFR Appendix E to Part 25 - Appendix E to Part 25
Code of Federal Regulations, 2010 CFR
2010-01-01
... certificated takeoff and landing weights of an airplane equipped with a type-certificated standby power rocket engine may obtain an increase as specified in paragraph (b) if— (1) The installation of the rocket engine has been approved and it has been established by flight test that the rocket engine and its controls...
13. View north within enclosure between old and new sections ...
13. View north within enclosure between old and new sections of Armory Street Pump House. Object at is a muffler and exhaust stack for the turbine powered stand-by generator unit. - Lake Whitney Water Filtration Plant, Armory Street Pumphouse, North side of Armory Street between Edgehill Road & Whitney Avenue, Hamden, New Haven County, CT
40 CFR 280.103 - Standby trust fund.
Code of Federal Regulations, 2011 CFR
2011-07-01
... [date] by and between [name of the owner or operator], a [name of state] [insert “corporation,” “partnership,” “association,” or “proprietorship”], the “Grantor,” and [name of corporate trustee], [insert... [insert either “a guarantee,” “surety bond,” or “letter of credit”] to provide all or part of such...
20 CFR 332.6 - Standing by for and laying over between regularly assigned trips or tours of duty.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Standing by for and laying over between regularly assigned trips or tours of duty. 332.6 Section 332.6 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD UNEMPLOYMENT INSURANCE ACT MILEAGE OR WORK RESTRICTIONS AND STAND-BY OR LAY...
Code of Federal Regulations, 2011 CFR
2011-01-01
... amount of bona fide sleep and meal time that may be excluded from hours of work may not exceed 8 hours in... considered hours of work. (e) On-duty sleep and meal time during regularly scheduled hours for which standby... firefighters compensated under 5 U.S.C. 5545b, on-duty sleep and meal time may not be excluded from hours of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... amount of bona fide sleep and meal time that may be excluded from hours of work may not exceed 8 hours in... considered hours of work. (e) On-duty sleep and meal time during regularly scheduled hours for which standby... firefighters compensated under 5 U.S.C. 5545b, on-duty sleep and meal time may not be excluded from hours of...
ERIC Educational Resources Information Center
Christensen, Rhonda; Knezek, Gerald
2018-01-01
The Going Green! Middle Schoolers Out to Save the World project aims to direct middle school students' enthusiasm for hands-on activities toward interest in science and other STEM areas while guiding them to solve real-world problems. Students in this project are taught by their teachers to use energy monitoring equipment to audit standby power…
5 CFR 550.143 - Bases for determining positions for which premium pay under § 550.141 is authorized.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Bases for determining positions for which... Standby Duty Pay § 550.143 Bases for determining positions for which premium pay under § 550.141 is... isolation, or solely because the employee lives on the grounds. (2) The hours during which the requirement...
5 CFR 550.143 - Bases for determining positions for which premium pay under § 550.141 is authorized.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Bases for determining positions for which... Standby Duty Pay § 550.143 Bases for determining positions for which premium pay under § 550.141 is... isolation, or solely because the employee lives on the grounds. (2) The hours during which the requirement...
10. View south at base of smokestack. Note monitor roof ...
10. View south at base of smokestack. Note monitor roof and laboratory on filtration bed at rear of photograph. (Across Armory Street). Cylindrical object at lower center is a muffler for the turbine powered stand-by generator unit. - Lake Whitney Water Filtration Plant, Armory Street Pumphouse, North side of Armory Street between Edgehill Road & Whitney Avenue, Hamden, New Haven County, CT
NASA Astrophysics Data System (ADS)
Fasquelle, Thomas; Falcoz, Quentin; Neveu, Pierre; Lecat, Florent; Boullet, Nicolas; Flamant, Gilles
2017-06-01
A thermocline thermal energy storage tank consists in using one single tank to store sensible heat. At almost any time, three zones coexist in the tank: a hot fluid zone at the top, a cold fluid zone at the bottom, and an intermediate zone called thermocline. Filling the tank with solid materials enables to reduce cost and to maintain the thermal stratification during stand-by periods. The present paper deals with a 230 kWh experimental thermocline tank that is included into a 150 kWth parabolic trough mini power plant. The heat transfer fluid is a non-pressurized synthetic oil (dibenzyltoluene) that flows through alumina spheres in the storage tank. The solid materials are contained into baskets in order to facilitate their removing and replacement. Thermocouples measure temperature along the center of the cylinder and along its radius. It is therefore possible to study the thermocline behavior thanks to the measured temperature profiles. A typical charge, a typical discharge and a stand-by process are presented and storage performances are discussed. The behavior of the tank in a dynamic system is also considered, by analyzing a typical day of solar production and storage of the energy surplus.
Instrumentation Cables Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Muna, Alice Baca; LaFleur, Chris Bensdotter
A fire at a nuclear power plant (NPP) has the potential to damage structures, systems, and components important to safety, if not promptly detected and suppressed. At Browns Ferry Nuclear Power Plant on March 22, 1975, a fire in the reactor building damaged electrical power and control systems. Damage to instrumentation cables impeded the function of both normal and standby reactor coolant systems, and degraded the operators’ plant monitoring capability. This event resulted in additional NRC involvement with utilities to ensure that NPPs are properly protected from fire as intended by the NRC principle design criteria (i.e., general design criteriamore » 3, Fire Protection). Current guidance and methods for both deterministic and performance based approaches typically make conservative (bounding) assumptions regarding the fire-induced failure modes of instrumentation cables and those failure modes effects on component and system response. Numerous fire testing programs have been conducted in the past to evaluate the failure modes and effects of electrical cables exposed to severe thermal conditions. However, that testing has primarily focused on control circuits with only a limited number of tests performed on instrumentation circuits. In 2001, the Nuclear Energy Institute (NEI) and the Electric Power Research Institute (EPRI) conducted a series of cable fire tests designed to address specific aspects of the cable failure and circuit fault issues of concern1. The NRC was invited to observe and participate in that program. The NRC sponsored Sandia National Laboratories to support this participation, whom among other things, added a 4-20 mA instrumentation circuit and instrumentation cabling to six of the tests. Although limited, one insight drawn from those instrumentation circuits tests was that the failure characteristics appeared to depend on the cable insulation material. The results showed that for thermoset insulated cables, the instrument reading tended to drift and fluctuate, while the thermoplastic insulated cables, the instrument reading fell off-scale rapidly. From an operational point of view, the latter failure characteristics would likely be identified as a failure from the effects of fire, while the former may result in inaccurate readings.« less
1982-10-01
e.g., providing voters in TMR systems and detection-switching requirements in standby-sparing sys- tems. The application of mathematical thoery of...and time redundancy required for error detection and correction, are interrelated. Mathematical modeling, when applied to fault tolerant systems, can...9 1.1 Some Fundamental Principles............................. 11 1.2 Mathematical Theory of
Operational Considerations for the Standby Diver in CUMA Dives
2010-11-01
avec ACDSM R.Y. Nishi; A.J. Ward; D.J. Eaton; DRDC Toronto TM 2010-082; R & D pour la défense Canada – Toronto; Novembre 2010. Introduction ou...11 Figure A-5. Computed inert gas loading in first and second compartments for 5 min at 9 msw .. 13 ... 13 Figure A-7. Computed inert gas loading in first and second compartments for 30
How Virtual Technology Can Impact Total Ownership Costs on a USN Vessel
2012-03-01
Clients (After Lam, 2010) Alternative Solutions Labor $M Hardware $M Software $M Transport $M Power & Cooling $M Virtualization $M...and will hold contractors accountable to ensure energy efficiency targets of new equipment are as advertised . 2. Total Cost of Ownership...automatically placed into Standby by the VMware software and reduced energy consumption by 230 watts. Even though there were 12 virtual desktops online and in
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... part 950 of this chapter. title. Sec. 1264.3(a), Sec. 926.4........ Sec. 1264.4. Introductory text. Sec...).. Sec. 1264.3(a)(2). Introductory text. Sec. 1264.4(c)(1)......... Sec. 926.3(a)(3).. Sec. 1264.3(a)(3...)......... Sec. 950.7 of this Sec. 950.7 of this chapter. title. Sec. 1269.3(a), Sec. Sec. Sec. Sec. Introductory...
Salama, N; Kishimoto, T; Kanayama, H-o; Kagawa, S
2010-01-01
The accumulating effects of exposure to electromagnetic radiation emitted by a conventional mobile phone (MP) on male sexual behaviour have not yet been analyzed. Therefore, we studied these effects in 18 male rabbits that were randomly divided into phone and control groups. Six female teasers were taken successively to the male's cage and the copulatory behavior was recorded. Serum total testosterone, dopamine and cortisol were evaluated. The animals of the phone group were exposed to MPs (800 MHz) in a standby position for 8 h daily for 12 weeks. At the end of the study, the copulatory behavior and hormonal assays were re-evaluated. Mounts without ejaculation were the main mounts in the phone group and its duration and frequency increased significantly compared with the controls, whereas the reverse was observed in its mounts with ejaculation. Ejaculation frequency dropped significantly, biting/grasping against teasers increased notably and mounting latency in accumulated means from the first to the fourth teasers were noted in the phone group. The hormonal assays did not show any significant differences between the study groups. Therefore, the pulsed radiofrequency emitted by a conventional MP, which was kept on a standby position, could affect the sexual behavior in the rabbit.
10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-01
Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less
Calendar aging of a 250 kW/500 kWh Li-ion battery deployed for the grid storage application
NASA Astrophysics Data System (ADS)
Kubiak, Pierre; Cen, Zhaohui; López, Carmen M.; Belharouak, Ilias
2017-12-01
The introduction of Li-ion batteries for grid applications has become evidence as the cost per kWh is continuously decreasing. Although the Li-ion battery is a mature technology for automotive applications and portable electronics, its use for stationary applications needs more validation. The Li-ion technology is considered safe enough for grid storage application, but its lifetime is generally evaluated to be around 10 years. Higher market penetration will be achieved if a longer lifespan could be demonstrated. Therefore, aging evaluation of the batteries becomes crucial. In this paper we investigated the effects of aging after a three years' standby field deployment of a 250 kW/500 kWh Li-ion battery integrated with the grid and solar farm under the harsh climate conditions of Qatar. The development of tools for acquisition and analysis of data from the battery management system (BMS) allows the assessment of the battery performance at the battery stack, string and cell levels. The analysis of the residual capacity after aging showed that the stack suffered from a low decrease of capacity, whereas some inconsistencies have been found between the strings. These inconsistencies are caused by misalignment of a small number of cells that underwent self-discharge during standby at high state of charge.
Three micron silicon-on-sapphire technology evaluation programme
NASA Astrophysics Data System (ADS)
Wootten, D.
1988-01-01
CellSOS, a standard design and manufacturable route used to produce radiation hardened SOS integrated circuits was evaluated. Single event upset (SEU) and total-dose aspects of radiation with extended life test data were considered. Worst case bias during irradiation for SOS RAMs is with 5V on VDD and inputs held high. The parameter with the major movement with radiation is standby current; no other parameter shows significant change with accumulated dose. The functional failure point of both RAMs with radiation is caused by this increase in current and not by the Vt shift preventing correct transistor operation. Life testing of irradiated and nonirradiated devices shows very little movement in parametrics over the 2000 hr except for standby current. The ability of the 3 micron SOS cell and SLM gate array products to maintain functionality and acceptable performance characteristic to total dose gamma radiation levels exceeding 1MRad (Si) is proved. The 3 micron SOS process has very good immunity to SEU within the space environment. Tests on the 4K RAM confirm that there is no latch-up mechanism present in SOS. The results also demonstrate that, provided the six transistors cell and layout is used for all 3 micron SOS RAMs, similar upset rates will be achieved.
Keech, Olivier; Pesquet, Edouard; Ahad, Abdul; Askne, Anna; Nordvall, Dag; Vodnala, Sharvani Munender; Tuominen, Hannele; Hurry, Vaughan; Dizengremel, Pierre; Gardeström, Per
2007-12-01
Senescence is an active process allowing the reallocation of valuable nutrients from the senescing organ towards storage and/or growing tissues. Using Arabidopsis thaliana leaves from both whole darkened plants (DPs) and individually darkened leaves (IDLs), we investigated the fate of mitochondria and chloroplasts during dark-induced leaf senescence. Combining in vivo visualization of fates of the two organelles by three-dimensional reconstructions of abaxial parts of leaves with functional measurements of photosynthesis and respiration, we showed that the two experimental systems displayed major differences during 6 d of dark treatment. In whole DPs, organelles were largely retained in both epidermal and mesophyll cells. However, while the photosynthetic capacity was maintained, the capacity of mitochondrial respiration decreased. In contrast, IDLs showed a rapid decline in photosynthetic capacity while maintaining a high capacity for mitochondrial respiration throughout the treatment. In addition, we noticed an unequal degradation of organelles in the different cell types of the senescing leaf. From these data, we suggest that metabolism in leaves of the whole DPs enters a 'stand-by mode' to preserve the photosynthetic machinery for as long as possible. However, in IDLs, mitochondria actively provide energy and carbon skeletons for the degradation of cell constituents, facilitating the retrieval of nutrients. Finally, the heterogeneity of the degradation processes involved during senescence is discussed with regard to the fate of mitochondria and chloroplasts in the different cell types.
NASA Technical Reports Server (NTRS)
Johnson, Steven D.; Byers, Jerry W.; Martin, James A.
2012-01-01
A method has been developed for continuous cell voltage balancing for rechargeable batteries (e.g. lithium ion batteries). A resistor divider chain is provided that generates a set of voltages representing the ideal cell voltage (the voltage of each cell should be as if the cells were perfectly balanced). An operational amplifier circuit with an added current buffer stage generates the ideal voltage with a very high degree of accuracy, using the concept of negative feedback. The ideal voltages are each connected to the corresponding cell through a current- limiting resistance. Over time, having the cell connected to the ideal voltage provides a balancing current that moves the cell voltage very close to that ideal level. In effect, it adjusts the current of each cell during charging, discharging, and standby periods to force the cell voltages to be equal to the ideal voltages generated by the resistor divider. The device also includes solid-state switches that disconnect the circuit from the battery so that it will not discharge the battery during storage. This solution requires relatively few parts and is, therefore, of lower cost and of increased reliability due to the fewer failure modes. Additionally, this design uses very little power. A preliminary model predicts a power usage of 0.18 W for an 8-cell battery. This approach is applicable to a wide range of battery capacities and voltages.
Dua, Gaurav; Navin Kumar, Andrews; Roy, Indranil Deb; Roy, Supriyo Kumar
2014-05-01
Patients with operated cleft lip and palate present with a problem of midface hypoplasia, and such patients have been traditionally treated with orthognathic surgery. Such a procedure has its own limitations of relapse and hence a newer modality of distraction osteogenesis with histiogenesis can be chosen to overcome such limitations for midfacial advancement. The purpose of this study is to evaluate an alternative technique and its postoperative stability in maxillary distraction osteogenesis in patients of cleft lip and cleft palate using a rigid external device (RED). Nine patients with midface bone stock deficiency were selected for maxillary advancement. At the first surgery under general anesthesia, after Le Fort I osteotomy, RED system was used with the alternative technique. After distraction, evaluation was done for ease of the procedure, stability, and complications. Lateral cephalograms were evaluated at 3 stages: T1, pre-distraction; T2, post-distraction; and T3, 1 year post-distraction. A mean 13.4-mm midface advancement was shown with bone formation at the pterygomaxillary region without losing the vector and having a standby mode in case the wire broke during distraction The results were stable even at 1 year of follow-up. Maxillary position improved in relation to the cranial base. This study showed that the RED was versatile in midface advancement.
NASA Technical Reports Server (NTRS)
Juhasz, A. J.; Bloomfield, H. S.
1985-01-01
A combinatorial reliability approach is used to identify potential dynamic power conversion systems for space mission applications. A reliability and mass analysis is also performed, specifically for a 100 kWe nuclear Brayton power conversion system with parallel redundancy. Although this study is done for a reactor outlet temperature of 1100K, preliminary system mass estimates are also included for reactor outlet temperatures ranging up to 1500 K.
Regional Engagement in Africa: Closing the Gap Between Strategic Ends and Ways
2011-09-01
Power Sharing in Rwanda to Successful Top-Down Military Integration,” 11. 41 Stephen D. Biddle, “Military Effectiveness,” in The International...in Rwanda ,” 11. 50 Mukhopadhyay, 558, 560. MARTEN The East African Standby Force (EASF) is East Africa’s contribution to the African Union’s African...efficient than dealing directly with the EASF. Sometimes this causes difficulties in conducting combined activities. In 2009, Burundi, Kenya, Rwanda
Helicopter Display Improvement Study
1975-05-01
PRESSURE INDICATOR 43 TURN A N D SLIP INDICATOR 21 ENGINE AND SDG OIL IN TEMPERATURE INDICATOR 44 COURSE INDICATOR 22 RADIO MAGNETIC COMPASS INDICATOR... compass seemed to present a problem to several H-l series pilots In that It was poorly located and should be moved. Possible locations Included...the UH-lNs standby compass . Both H/L and L/L pilots agreed that internal, white light was the best system currently in use. INDIVIDUAL DISPLAYS
Design Analysis of a Prepackaged Nuclear Power Plant for an Ice Cap Location
1959-01-15
requirements and heating load 1.3 Site Conditions 1,U Air Transportability 1.5 Standby Power Availability 1.6 Building Structuree and Foundations 2,0...Skid with Reactor and Steam Generator Generator Weight Distribution Foundation Load Diagram (Secondary) Turbine Generator Package - Typical...Requirements and Heating Load The plant shall be capable of producing a minimum of 1500 Kw net ^ electrical energy at 4160/2400 volts, three phase
1977-05-01
444 EN 2 31043 TEST UNIT INJECTORS AND/OR FUEL INJECTION NOZZLES 445 EN 2 31044 MAINTENANCE OF FUEL OIL INJECTORS 446 EN 2 31049 PREVENTION OF...OPERATIONAL MAINTENANCE OF DIESEL ENGINES OPERATE INTERNAL COMBUSTION ENGINES JACKING GEAR ON INTERNAL COMBUSTION ENGINES CARRYOUT TURNING OVER OF MAIN...ENGINES ALIGN LUBRICATING OIL SYSTEM USE OF STANDBY LUBRICATING OIL PUMPS PURGE DIESEL ENGINE FUEL INJECTION SYSTEM ENTRIES TO MAIN PROPULSION
49 CFR Appendix A to Part 234 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2010 CFR
2010-10-01
....219Gate arm lights and light cable 1,000 2,000 234.221Lamp voltage 1,000 2,000 234.223Gate arm 1,000 2,000... 234.251Standby power 5,000 7,500 234.253Flashing light units and lamp voltage 1,000 2,000 234.255Gate....265Timing relays and timing devices 1,000 2,000 234.267Insulation resistance tests, wires in trunking and...
Prospects of the Economic Community of West African States Standby Force
2006-06-16
two speak Portuguese. Member states of ECOWAS are Burkina Faso, Benin , Cape Verde, Côte d’Ivoire, Gambia, Ghana, Guinea, Guinea- 6 Bissau, Liberia...Also, the required size of the force to fulfill its mandate was not met. The countries that contributed troops were Benin , Niger and Togo (IRIN 2004...support for ECOWAS troops. Britain channeled its efforts through Ghana; Benin was supported by Belgium; France’s assistance was conveyed through Niger
ASEAN Standby Force: Taking Southeast Asia Security to the Next Level
2013-03-01
official policy or position of the Department of the Army, Department of Defense, or the U.S. Government . U.S. Army War College CARLISLE BARRACKS...regional community environment. These forums have addressed issues including the Asian financial crisis, food and energy security, human trafficking ...its policies toward China, in light of its growing economic might and military power in the Pacific.35 In China, the government welcomed Mr. Obama’s
New hypersonic facility capability at NASA Lewis Research Center
NASA Technical Reports Server (NTRS)
Haas, Jeffrey E.; Chamberlin, Roger; Dicus, John H.
1989-01-01
Four facility activities are underway at NASA Lewis Research Center to develop new hypersonic propulsion test capability. Two of these efforts consist of upgrades to existing operational facilities. The other two activities will reactivate facilities that have been in a standby condition for over 15 years. These four activities are discussed and the new test facilities NASA Lewis will have in place to support evolving high speed research programs are described.
Mission and sensor concepts for coastal and ocean monitoring using spacecraft and aircraft
NASA Technical Reports Server (NTRS)
Darnell, W. L.
1980-01-01
A concept developed for a 1990 oceanic mission which places strong emphasis on coastal monitoring needs is described and analysed. The concept assumes that use of one active spacecraft in orbit and one on standby plus airplanes and data collection platforms which provide continuing complementary coverage and surface truth. The coastal measurement requirements and goals, the prospective oceanic and coastal sensors, the spacecraft and aircraft data platforms, and the prospective orbit designs are discussed.
2015-08-17
from the same execution history, and cost-effective active response by proactively setting up standby VM replicas: migration from a compromised VM...the guest OSes system call code to be reused inside a “shadowed” portion of the context of the out-of- guest inspection program. Besides...by the rootkits in cloud environments. RootkitDet detects rootkits by identifying suspicious code region in the kernel space of guest OSes through
1992 five year battery forecast
DOE Office of Scientific and Technical Information (OSTI.GOV)
Amistadi, D.
1992-12-01
Five-year trends for automotive and industrial batteries are projected. Topic covered include: SLI shipments; lead consumption; automotive batteries (5-year annual growth rates); industrial batteries (standby power and motive power); estimated average battery life by area/country for 1989; US motor vehicle registrations; replacement battery shipments; potential lead consumption in electric vehicles; BCI recycling rates for lead-acid batteries; US average car/light truck battery life; channels of distribution; replacement battery inventory end July; 2nd US battery shipment forecast.
Commercial grade item (CGI) dedication of generators for nuclear safety related applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Das, R.K.; Hajos, L.G.
1993-03-01
The number of nuclear safety related equipment suppliers and the availability of spare and replacement parts designed specifically for nuclear safety related application are shrinking rapidly. These have made it necessary for utilities to apply commercial grade spare and replacement parts in nuclear safety related applications after implementing proper acceptance and dedication process to verify that such items conform with the requirements of their use in nuclear safety related application. The general guidelines for the commercial grade item (CGI) acceptance and dedication are provided in US Nuclear Regulatory Commission (NRC) Generic Letters and Electric Power Research Institute (EPRI) Report NP-5652,more » Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications. This paper presents an application of these generic guidelines for procurement, acceptance, and dedication of a commercial grade generator for use as a standby generator at Salem Generating Station Units 1 and 2. The paper identifies the critical characteristics of the generator which once verified, will provide reasonable assurance that the generator will perform its intended safety function. The paper also delineates the method of verification of the critical characteristics through tests and provide acceptance criteria for the test results. The methodology presented in this paper may be used as specific guidelines for reliable and cost effective procurement and dedication of commercial grade generators for use as standby generators at nuclear power plants.« less
Digital mobile telephones and interference of ophthalmic equipment.
Ang, G S; Lian, P; Ng, W S; Whyte, I; Ong, J M
2007-01-01
To assess the effect of mobile telephone electromagnetic interference on electronic ophthalmic equipment. Prospective audit with mobile telephones placed at distances of 3 m, 1 m, and 30 cm from, and in contact with, electronic ophthalmic equipment. Any interruption or cessation of the function of the ophthalmic device was assessed with the mobile telephones in standby, and in dialling or receiving modes. Any alterations of displayed digital figures or numbers were also assessed. A total of 23 electronic ophthalmic devices in two hospital ophthalmology outpatient departments were evaluated. All six mobile telephones used, and 22 (95.7%) of the 23 ophthalmic equipment evaluated had the Conformité Européene (CE) mark. No device showed any interruption or cessation of function. There were no alterations of displayed digital figures or numbers. The only effect of any kind was found with four instruments (1 non-CE marked), where there was temporary flickering on the screen, and only occurred when the mobile telephones were dialling or receiving at a distance of 30 cm or less from the instruments. This study shows that among the electronic ophthalmic devices tested, none suffered failure or interruption of function, from mobile telephone interference. Although not comprehensive for all ophthalmic equipment, the results question the need for a complete ban of mobile telephones in ophthalmic departments. It highlights the need for a controlled, objectively measured study of the clinically relevant effects of mobile telephones in the ophthalmology outpatient setting.
Assured crew return capability Crew Emergency Return Vehicle (CERV) avionics
NASA Technical Reports Server (NTRS)
Myers, Harvey Dean
1990-01-01
The Crew Emergency Return Vehicle (CERV) is being defined to provide Assured Crew Return Capability (ACRC) for Space Station Freedom. The CERV, in providing the standby lifeboat capability, would remain in a dormat mode over long periods of time as would a lifeboat on a ship at sea. The vehicle must be simple, reliable, and constantly available to assure the crew's safety. The CERV must also provide this capability in a cost effective and affordable manner. The CERV Project philosophy of a simple vehicle is to maximize its useability by a physically deconditioned crew. The vehicle reliability goes unquestioned since, when needed, it is the vehicle of last resort. Therefore, its systems and subsystems must be simple, proven, state-of-the-art technology with sufficient redundancy to make it available for use as required for the life of the program. The CERV Project Phase 1'/2 Request for Proposal (RFP) is currently scheduled for release on October 2, 1989. The Phase 1'/2 effort will affirm the existing project requirements or amend and modify them based on a thorough evaluation of the contractor(s) recommendations. The system definition phase, Phase 2, will serve to define CERV systems and subsystems. The current CERV Project schedule has Phase 2 scheduled to begin October 1990. Since a firm CERV avionics design is not in place at this time, the treatment of the CERV avionics complement for the reference configuration is not intended to express a preference with regard to a system or subsystem.
The Rome Laboratory Reliability Engineer’s Toolkit
1993-04-01
34Testability Programs for Electronic Systems and Equipment" DODD 5000.1 "Defense Acquistion " DODI 5000.2 "Defense Acquisition Management Policies and...these paths have an equivalent failure rate of zero so that only the remaining serial elements need to be translated. 5. The requirement process...X6) X A2+B2+XAXB One standby off-line unit with n active on- line units required for success. Off-line spare assumed to have a failure rate of zero
Cryogenic and thermal design for the Superfluid Helium On-Orbit Transfer (SHOOT) experiment
NASA Technical Reports Server (NTRS)
Lee, J. H.; Maa, S.; Brooks, W. F.; Ng, Y. S.
1988-01-01
The analysis and trade-offs of the external thermal design of the two 200-liter dewars required in the SHOOT experiment to extend space mission life by superfluid helium replenishment are discussed. Also considered are the support electronics and the optimization and prediction of the performance of the dewar and cryostat assemblies. Particular attention is given to the ground-hold and standby performance of the dewars, along with the temperature of the helium bath during high-flow-rate helium transfers.
2001-10-24
Notification of Selection for Promotion—Officers Assigned to Control Group (Dual Component), page 57 Figure 4–15: Memorandum Format for Notification of... Group Standby Reserve (Active Status List) officers. (3) USAR officers released from AD in the grade of COL and below, and not under the jurisdiction...Control Group (Officer Active Duty Obligor) (OADO) or under administrative control of the Control Group (OADO) with concurrent assignment to a Reserve
2015-06-12
collective security mechanisms, almost from nothing, in less than 20 years. Since 2003, the AU has deployed missions to Burundi (AMIB), Sudan/ Darfur (AMIS...deployment of AU missions in Somalia, Darfur and in the CAR. ECOWAS, despite the absence of a formalized MOU between its member states, is...proven somewhat effective in eastern Africa where the AU deployed a mission first in Darfur and then in Somalia, which the UN later undertook. However
Validation Data for Mechanical System Algorithms Used in Building Energy Analysis Programs.
1982-02-01
15 Zone Design 15 Built-Up Air Handler 15 Ventilation Requirements 16 The DES 16 Duct Design 17 Air -Delivery System 17 VAV Operation 17 Constant Volume...observed to operate well at reduced air flows, even at low flow in the so- called surge region. Recommendations 1. The HVAC system and component...With Inlet Guide Vanes Operating Within a Built-Up Air Handler 31 Test 2 -- Boiler Operation, Capacity, Efficiency, and Stand-By Losses 32 Test 3
Necessity of creating digital tools to ensure efficiency of technical means
NASA Astrophysics Data System (ADS)
Rakov, V. I.; Zakharova, O. V.
2018-05-01
The authors estimated the problems of functioning of technical objects. The article notes that the increasing complexity of automation systems may lead to an increase of the redundant resource in proportion to the number of components and relationships in the system, and to the need of the redundant resource constant change that can make implementation of traditional structures with redundancy unnecessarily costly (Standby System, Fault Tolerance, High Availability). It proposes the idea of creating digital tools to ensure efficiency of technical facilities.
2012-10-01
VarTech Ruggedized Computer Features The IDVD consisted of a VarTech brand ruggedized computer within a NEMA enclosure (VARTEC VTPC104PHB). Optional...range 9 to 36V Rechargeable Battery Power (10 hrs, 1 month in standby) Gain in Function Resolution 1024 x 768 1024 x 768 Even NEMA Enclosure NEMA ...there is some functionality loss associated with that. The display is not easily readable in the sunlight, it does not have a weatherproof NEMA
New Partnerships for a New Era: Enhancing the South African Army’s Stabilization Role in Africa
2009-06-01
Union and the African Standby Force. The path to peace and stability in Africa is a long one, but these are important first steps. One of the...principal African nations in this effort has been South Africa. That nation’s armed forces have been heavily committed to African Union and United...range of important continental and regional initiatives such as the formation of the African Union (AU), including its Peace and Security Council
2017-12-11
provides ultra-low energy search operations. To improve throughput, the in-array pipeline scheme has been developed, allowing the MeTCAM to operate at a...controlled magnetic tunnel junction (VC-MTJ), which not only reduces cell area (thus achieving higher density) but also eliminates standby energy . This...Variations of the cell design are presented and evaluated. The results indicated a potential 90x improvement in the energy efficiency and a 50x
1973-08-01
average to peak flows. Cost estimates include provision of diesel-electric standby power generation. Sewage pumping stations are generally designed for a...20 year design period. The pumping station power costs have been based on a pump efficiency of 75%, the appropriate pumping head, and a power cost of...considered by the project evaluators. Table E4 shows both the total power generating capacity of the station as well as that which is normally available
NASA Astrophysics Data System (ADS)
Adeyeye, Adekunle
In the last few years, interest in propagating-spin-wave based devices has grown largely due to advances in nanotechnology which allows shapes of geometrically confined magnonic elements to be fabricated, the development of new advanced experimental techniques for studying high-frequency magnetization dynamics and the potential use of spin waves as information carriers in spintronic applications. The first part of this talk will focus on design and fabrication strategies for synthesizing nanomagnetic networks with deterministic magnetic ground states. Reliable reconfiguration between ferromagnetic (FM), antiferromagnetic (AFM) and ferrimagnetic ground magnetic states will be shown in rhomboid nanomagnets which stabilize to unique ground states upon field initialized along their short axis. In the second part, a new waveguide consisting of dipolar coupled rhombic shaped nanomagnetic chain that eliminate the requirement of a stand-by power during operation will be presented. The sizes of the nanomagnets are small enough to retain their correct magnetic states once initialized. It will be shown that our waveguide could be used to send spin wave signal around a corner without any stand-by power. Another important parameter for device operation is the manipulation of the output signal, which is similar to a gating operation in a transistor. In our design, gating operation is demonstrated by switching the magnetization of single/multiple nanomagnets in the waveguides in order to manipulate the spin wave amplitude at the output. This work is supported by the National Research Foundation, Prime Minister's Office, under CRP 10-2012-03.
NASA Astrophysics Data System (ADS)
Widodo, Slamet; Miftakul, Amin M.; Sutrisman, Adi
2018-02-01
There are many phenomena that human are exposed to toxins from certain types such as of CO2, CO2 and CH4 gases. The device used to detect large amounts of CO, CO2, and CH4 gas in air in enclosed spaces using MQ 135 gas sensors of different types based on the three sensitivity of the Gas. The results of testing the use of sensors MQ 135 on the gas content of CO, CO2 and CH4 received by the sensor is still in the form of ppm based on the maximum ppm detection range of each sensor. Active sensor detects CO 120 ppm gas, CO2 1600 ppm and CH4 1ppm "standby 1" air condition with intermediate rotary fan. Active sensor detects CO 30 ppm gas, CO2 490 ppm and CH4 7 ppm "Standby 2" with low rotating fan output. Fuzzy rulebase logic for motor speed when gas detection sensor CO, CO2, and CH4 output controls the motion speed of the fan blower. Active sensors detect CO 15 ppm, CO2 320 ppm and CH4 45 ppm "Danger" air condition with high fan spin fan. At the gas level of CO 15 ppm, CO2 390 ppm and CH4 3 ppm detect "normal" AC sensor with fan output stop spinning.
Rolling, Thierry; Mühlenpfordt, Melina; Addo, Marylyn M; Cramer, Jakob P; Vinnemeier, Christof D
Specific travel-related recommendations exist for the prevention or self-treatment of infectious diseases contracted by travellers to the tropics. In the current study, we assessed the medical preparedness per these recommendations, focusing on whether travellers carried antidiarrheal and antimalarial medication with them stratified by type of pre-travel advice. We surveyed travellers departing from Hamburg International Airport to South or Southeast Asia, using a questionnaire on demographic, medical and travel characteristics. 975 travellers were analysed - the majority (817, 83%) being tourists. A large proportion packed any antidiarrheal medication (612, 63%) - most frequently loperamide (440, 72%). Only 176 of 928 (19%) travellers to destinations with low-to medium risk for malaria packed a recommended antimalarial medication. The majority (162, 17%) of them carried antimalarials as stand-by emergency treatment (SBET). 468 (48%) travellers had a pre-travel medical consultation. This lead to higher odds of carrying SBET- with the highest odds associated with a consultation at a travel medicine specialist (OR 7.83 compared to no consultation). Attending a travel medicine specialist was associated with better adherence to current recommendations concerning the carriage of stand-by emergency treatment of malaria. However, the proportion of travellers seeking pre-travel health advice was overall low in our population. Promoting pre-travel consultations may, therefore, lead to higher adherence to the current recommendations in travel medicine. Copyright © 2017 Elsevier Ltd. All rights reserved.
Evaluating reliability of WSN with sleep/wake-up interfering nodes
NASA Astrophysics Data System (ADS)
Distefano, Salvatore
2013-10-01
A wireless sensor network (WSN) (singular and plural of acronyms are spelled the same) is a distributed system composed of autonomous sensor nodes wireless connected and randomly scattered into a geographical area to cooperatively monitor physical or environmental conditions. Adequate techniques and strategies are required to manage a WSN so that it works properly, observing specific quantities and metrics to evaluate the WSN operational conditions. Among them, one of the most important is the reliability. Considering a WSN as a system composed of sensor nodes the system reliability approach can be applied, thus expressing the WSN reliability in terms of its nodes' reliability. More specifically, since often standby power management policies are applied at node level and interferences among nodes may arise, a WSN can be considered as a dynamic system. In this article we therefore consider the WSN reliability evaluation problem from the dynamic system reliability perspective. Static-structural interactions are specified by the WSN topology. Sleep/wake-up standby policies and interferences due to wireless communications can be instead considered as dynamic aspects. Thus, in order to represent and to evaluate the WSN reliability, we use dynamic reliability block diagrams and Petri nets. The proposed technique allows to overcome the limits of Markov models when considering non-linear discharge processes, since they cannot adequately represent the aging processes. In order to demonstrate the effectiveness of the technique, we investigate some specific WSN network topologies, providing guidelines for their representation and evaluation.
NASA Astrophysics Data System (ADS)
Ashenafi, Emeshaw
Integrated circuits (ICs) are moving towards system-on-a-chip (SOC) designs. SOC allows various small and large electronic systems to be implemented in a single chip. This approach enables the miniaturization of design blocks that leads to high density transistor integration, faster response time, and lower fabrication costs. To reap the benefits of SOC and uphold the miniaturization of transistors, innovative power delivery and power dissipation management schemes are paramount. This dissertation focuses on on-chip integration of power delivery systems and managing power dissipation to increase the lifetime of energy storage elements. We explore this problem from two different angels: On-chip voltage regulators and power gating techniques. On-chip voltage regulators reduce parasitic effects, and allow faster and efficient power delivery for microprocessors. Power gating techniques, on the other hand, reduce the power loss incurred by circuit blocks during standby mode. Power dissipation (Ptotal = Pstatic and Pdynamic) in a complementary metal-oxide semiconductor (CMOS) circuit comes from two sources: static and dynamic. A quadratic dependency on the dynamic switching power and a more than linear dependency on static power as a form of gate leakage (subthreshold current) exist. To reduce dynamic power loss, the supply power should be reduced. A significant reduction in power dissipation occurs when portions of a microprocessor operate at a lower voltage level. This reduction in supply voltage is achieved via voltage regulators or converters. Voltage regulators are used to provide a stable power supply to the microprocessor. The conventional off-chip switching voltage regulator contains a passive floating inductor, which is difficult to be implemented inside the chip due to excessive power dissipation and parasitic effects. Additionally, the inductor takes a very large chip area while hampering the scaling process. These limitations make passive inductor based on-chip regulator design very unattractive for SOC integration and multi-/many-core environments. To circumvent the challenges, three alternative techniques based on active circuit elements to replace the passive LC filter of the buck convertor are developed. The first inductorless on-chip switching voltage regulator architecture is based on a cascaded 2nd order multiple feedback (MFB) low-pass filter (LPF). This design has the ability to modulate to multiple voltage settings via pulse-with modulation (PWM). The second approach is a supplementary design utilizing a hybrid low drop-out scheme to lower the output ripple of the switching regulator over a wider frequency range. The third design approach allows the integration of an entire power management system within a single chipset by combining a highly efficient switching regulator with an intermittently efficient linear regulator (area efficient), for robust and highly efficient on-chip regulation. The static power (Pstatic) or subthreshold leakage power (Pleak) increases with technology scaling. To mitigate static power dissipation, power gating techniques are implemented. Power gating is one of the popular methods to manage leakage power during standby periods in low-power high-speed IC design. It works by using transistor based switches to shut down part of the circuit block and put them in the idle mode. The efficiency of a power gating scheme involves minimum Ioff and high Ion for the sleep transistor. A conventional sleep transistor circuit design requires an additional header, footer, or both switches to turn off the logic block. This additional transistor causes signal delay and increases the chip area. We propose two innovative designs for next generation sleep transistor designs. For an above threshold operation, we present a sleep transistor design based on fully depleted silicon-on-insulator (FDSOI) device. For a subthreshold circuit operation, we implement a sleep transistor utilizing the newly developed silicon-on-ferroelectric-insulator field effect transistor (SOFFET). In both of the designs, the ability to control the threshold voltage via bias voltage at the back gate makes both devices more flexible for sleep transistors design than a bulk MOSFET. The proposed approaches simplify the design complexity, reduce the chip area, eliminate the voltage drop by sleep transistor, and improve power dissipation. In addition, the design provides a dynamically controlled Vt for times when the circuit needs to be in a sleep or switching mode.
Solar hot water system installed at Day's Inn Motel, Dallas, Texas (Valley View)
NASA Technical Reports Server (NTRS)
1980-01-01
The solar system was designed to provide 65 percent of the total domestic hot water (DHW) demand. A liquid (water) flat plate collector (1,000 square feet) system automatically drains into the 1,000 gallon steel storage tank when the solar pump is not running. Heat is transferred from the DHW tanks through a shell and tube heat exchanger. A circulating pump between the DHW tanks and heat exchanger enables solar heated water to help make up standby losses. All pumps are controlled by differential temperature controllers.
2012-03-01
weapon. The paramilitary style assault by two students at Columbine High School in 1999 revealed serious shortcomings in the fire service “standby...1158 hours, four of those students were still lying on the lawn in front of the school cafeteria . Even though the scene was not secure, paramedics...Lance Kirklin, one of the severely injured students rescued from in front of the cafeteria , briefly stopped at the incident command post en route to
Sealed nickel cadmium batteries
NASA Astrophysics Data System (ADS)
Raudszus, W.; Kiehne, H. A.; Cloke, F. R.
1982-10-01
The design, manufacture, and application of maintenance-free sealed NiCd batteries are surveyed. The principles of electrochemical power supplies and the history of the development of NiCd cells are reviewed. The batteries produced by Varta Batterie AG are presented; topics discussed include design parameters, electrical and physical characteristics, performance under adverse conditions, type range, production, and quality control. Application techniques, including cell-type choice, charging units and charging circuits, and the construction of standby power supplies, are considered, with reference to national and international standards of performance and classification. No individual items are abstracted in this volume
Solar hot water system installed at Days Inn Motel, Jacksonville, Florida
NASA Technical Reports Server (NTRS)
1980-01-01
The solar system was designed to provide 65 percent of the hot water demand. Water in the liquid flat plate collector (900 square feet) system automatically drains into the 1000 gallon lined and vented steel storage tank when the pump is not running. Heat is transferred from storage to Domestic Hot Water (DHW) tanks through a tube and shell heat exchanger. A circulating pump between the DHW tanks and heat exchanger enables solar heated water to help make up DHW standby losses. All pumps are controlled by differential temperature.
Standby cooling system for a fluidized bed boiler
Crispin, Larry G.; Weitzel, Paul S.
1990-01-01
A system for protecting components including the heat exchangers of a fluidized bed boiler against thermal mismatch. The system includes an injection tank containing an emergency supply of heated and pressurized feedwater. A heater is associated with the injection tank to maintain the temperature of the feedwater in the tank at or about the same temperature as that of the feedwater in the heat exchangers. A pressurized gas is supplied to the injection tank to cause feedwater to flow from the injection tank to the heat exchangers during thermal mismatch.
1994-07-01
including standby losses. The required input fuel rate is 261.000 Btu/hr ( LHV ) or 277,700 Btu/hr ( HHV ). The Becker burner used in the system is rated at 2...cost of -$6/gallon. Burning diesel fuel , with 20-percent excess air and a final exhaust temperature of 932°F, requires a fuel LHV input of 261,000 Btu...GPH diesel fuel burning rate, corresponding to 280.000 Btu/hr ( HHV ) input. The flue gases leave the fluid heater at a nominal temperature of 932°F
49. (Credit JTL) View looking northeast at #1 high service ...
49. (Credit JTL) View looking northeast at #1 high service pumping engine built in 1900 by Henry R. Worthington Hydraulic Works. This engine is a direct-acting, horizontal, triple expansion condensing engine with 12"x24", 19"x24" and 30"x24" cylinders and a pumping capacity of 3 to 4 mgd. Engine was in service until mid 1970's and remained on stand-by until August 1980. Doors behind engine lead to filter rooms. - McNeil Street Pumping Station, McNeil Street & Cross Bayou, Shreveport, Caddo Parish, LA
Breathing metabolic simulator.
NASA Technical Reports Server (NTRS)
Bartlett, R. G., Jr.; Hendricks, C. M.; Morison, W. B.
1971-01-01
Description of a device for simulation of the human breathing and metabolic parameters required for the evaluation of respiratory diagnostic, monitoring, support and resuscitation equipment. The remotely controlled device allows wide variations in breathing rate and depth, breath velocity contour, oxygen uptake and carbon dioxide release to simulate conditions from sleep to hard work, with respiration exchange ratios ranging from hypoventilation to hyperventilation. It also reduces the cost of prolonged testing when simulation chambers with human subjects require three shifts of crews and standby physicians. Several block diagrams of the device and subsystems are given.
1978-11-03
shipboard navigational aids (instrumentation) and enviromental navigational aid (buoys and other fixed references). The types of shipboard...life experiences of pilots. Ql 3-5 work t the direct indirectI I I authori1ties ’ mental standby physical travel home etc.! domestictypes of l / social ...the shipping industry, all sides of it, needs to take a long hard look at itself and get up-to-date for social as well as eccnomic reasons. Criteria
Standby energy conservation plan no. 2: Building temperature restrictions plan
NASA Astrophysics Data System (ADS)
1980-02-01
The environmental impacts of the proposed building temperature restrictions plan are analyzed. The plan would result in fuel and energy savings which could be diverted to other areas. Environmental impacts, with emphasis on air quality, were analyzed and found to result in a very minor improvement in air quality. Public health impacts are also minimal, and although some individuals may experience discomfort, it can be minimized by adjustments in clothing. The change in temperature is insufficient to have any significant impact on persons suffering from most diseases.
Design of EPON far-end equipment based on FTTH
NASA Astrophysics Data System (ADS)
Feng, Xiancheng; Yun, Xiang
2008-12-01
Now, most favors fiber access is mainly the EPON fiber access system. Inheriting from the low cost of Ethernet, usability and bandwidth of optical network, EPON technology is one of the best technologies in fiber access and is adopted by the carriers all over the world widely. According to the scheme analysis to FTTH fan-end equipment, hardware design of ONU is proposed in this paper. The FTTH far-end equipment software design deference modulation design concept, it divides the software designment into 5 function modules: the module of low-layer driver, the module of system management, the module of master/slave communication, and the module of main/Standby switch and the module of command line. The software flow of the host computer is also analyzed. Finally, test is made for Ethernet service performance of FTTH far-end equipment, E1 service performance and the optical path protection switching, and so on. The results of test indicates that all the items are accordance with technical request of far-end ONU equipment and possess good quality and fully reach the requirement of telecommunication level equipment. The far-end equipment of FTTH divides into several parts based on the function: the control module, the exchange module, the UNI interface module, the ONU module, the EPON interface module, the network management debugging module, the voice processing module, the circuit simulation module, the CATV module. In the downstream direction, under the protect condition, we design 2 optical modules. The system can set one group optical module working and another group optical module closure when it is initialized. When the optical fiber line is cut off, the LOS warning comes out. It will cause MUX to replace another group optical module, simultaneously will reset module 3701/3711 and will make it again test the distance, and will give the plug board MPC850 report through the GPIO port. During normal mode, the downstream optical signal is transformed into the electrical signal by the optical module. In the upstream direction, the upstream Ethernet data is retransmitted through the exchange chip BCM5380 to the GMII/MII in module 3701/3711, and then is transmitted to EPON port. The 2MB data are transformed the Ethernet data packet in the plug board TDM, then it's transmitted to the interface MII of the module 3701/3711. The software design of FTTH far-end equipment compiles with modulation design concept. According to the system realization duty, the software is divided into 5 function modules: low-level driver module, system management module, master/slave communication module, the man/Standby switch module and the command line module. The FTTH far-end equipment test, is mainly the Ethernet service performance test, E1 service performance test and the optical path protection switching test and so on the key specification test.
The influence of direct mobile phone radiation on sperm quality.
Gorpinchenko, Igor; Nikitin, Oleg; Banyra, Oleg; Shulyak, Alexander
2014-01-01
It is impossible to imagine a modern socially-active man who does not use mobile devices and/or computers with Wi-Fi function. The effect of mobile phone radiation on male fertility is the subject of recent interest and investigations. The aim of this study was to investigate the direct in vitro influence of mobile phone radiation on sperm DNA fragmentation and motility parameters in healthy subjects with normozoospermia. 32 healthy men with normal semen parameters were selected for the study. Each sperm sample was divided into two equal portions (A and B). Portions A of all involved men were placed for 5 hours in a thermostat, and portions B were placed into a second thermostat for the same period of time, where a mobile phone in standby/talk mode was placed. After 5 hours of incubation the sperm samples from both thermostats were re-evaluated regarding basic motility parameters. The presence of DNA fragmentation in both A and B portions of each sample was determined each hour using a standard sperm chromatin dispersion test. The number of spermatozoa with progressive movement in the group, influenced by electromagnetic radiation, is statistically lower than the number of spermatozoa with progressive movement in the group under no effect of the mobile phone. The number of non-progressive movement spermatozoa was significantly higher in the group, which was influenced by cell phone radiation. The DNA fragmentation was also significantly higher in this group. A correlation exists between mobile phone radiation exposure, DNA-fragmentation level and decreased sperm motility.
Recent Trends in Spintronics-Based Nanomagnetic Logic
NASA Astrophysics Data System (ADS)
Das, Jayita; Alam, Syed M.; Bhanja, Sanjukta
2014-09-01
With the growing concerns of standby power in sub-100-nm CMOS technologies, alternative computing techniques and memory technologies are explored. Spin transfer torque magnetoresistive RAM (STT-MRAM) is one such nonvolatile memory relying on magnetic tunnel junctions (MTJs) to store information. It uses spin transfer torque to write information and magnetoresistance to read information. In 2012, Everspin Technologies, Inc. commercialized the first 64Mbit Spin Torque MRAM. On the computing end, nanomagnetic logic (NML) is a promising technique with zero leakage and high data retention. In 2000, Cowburn and Welland first demonstrated its potential in logic and information propagation through magnetostatic interaction in a chain of single domain circular nanomagnetic dots of Supermalloy (Ni80Fe14Mo5X1, X is other metals). In 2006, Imre et al. demonstrated wires and majority gates followed by coplanar cross wire systems demonstration in 2010 by Pulecio et al. Since 2004 researchers have also investigated the potential of MTJs in logic. More recently with dipolar coupling between MTJs demonstrated in 2012, logic-in-memory architecture with STT-MRAM have been investigated. The architecture borrows the computing concept from NML and read and write style from MRAM. The architecture can switch its operation between logic and memory modes with clock as classifier. Further through logic partitioning between MTJ and CMOS plane, a significant performance boost has been observed in basic computing blocks within the architecture. In this work, we have explored the developments in NML, in MTJs and more recent developments in hybrid MTJ/CMOS logic-in-memory architecture and its unique logic partitioning capability.
The influence of direct mobile phone radiation on sperm quality
Gorpinchenko, Igor; Nikitin, Oleg; Shulyak, Alexander
2014-01-01
Introduction It is impossible to imagine a modern socially–active man who does not use mobile devices and/or computers with Wi–Fi function. The effect of mobile phone radiation on male fertility is the subject of recent interest and investigations. The aim of this study was to investigate the direct in vitro influence of mobile phone radiation on sperm DNA fragmentation and motility parameters in healthy subjects with normozoospermia. Material and methods 32 healthy men with normal semen parameters were selected for the study. Each sperm sample was divided into two equal portions (A and B). Portions A of all involved men were placed for 5 hours in a thermostat, and portions B were placed into a second thermostat for the same period of time, where a mobile phone in standby/talk mode was placed. After 5 hours of incubation the sperm samples from both thermostats were re–evaluated regarding basic motility parameters. The presence of DNA fragmentation in both A and B portions of each sample was determined each hour using a standard sperm chromatin dispersion test. Results The number of spermatozoa with progressive movement in the group, influenced by electromagnetic radiation, is statistically lower than the number of spermatozoa with progressive movement in the group under no effect of the mobile phone. The number of non–progressive movement spermatozoa was significantly higher in the group, which was influenced by cell phone radiation. The DNA fragmentation was also significantly higher in this group. Conclusions A correlation exists between mobile phone radiation exposure, DNA–fragmentation level and decreased sperm motility. PMID:24982785
Palmar pressure distribution during push-up exercise.
Chuckpaiwong, B; Harnroongroj, T
2009-07-01
Doing repetitive push-ups is among the most common exercise for the upper body and shoulder stabiliser muscle strength training. However, adverse effects such as neck pain, back pain, palmar pain and wrist pain have been reported. To date, to our knowledge, palmar pressure when performing push-ups has not been previously reported. We hypothesised that various hand positions during push-ups may provide different palmar pressures. Bilateral palmar pressures were recorded in ten individual volunteers. All the subjects were set up for doing push-ups in five positions of the hand. Peak palmar pressure was recorded by Emed pressure platform system (Novel GmBH, Munich, Germany). The palm was divided into the following five anatomic regions, viz. thenar, lunate, hypothenar, metacarpals and fingers. Statistical comparison between the five positions of the hand was analysed using the analysis of variance test. A distribution of the mean peak pressure of the lunate and hypothenar areas were relatively higher than the other areas in both standby and full-elbow flexion positions. At the palmar position 30 cm wider than the shoulder width, the palmar pressure revealed significantly higher peak pressure in the lunate area in the standby and fully-flexed elbow positions (p-value is less than 0.05). At the palmar position 10 cm narrower than the shoulder width, palmar pressure showed significantly higher peak pressure in the hypothenar area only in the fully-flexed elbow position. The information regarding palmar pressures while performing push-ups in different hand positions may be used as a guideline for exercise modification, especially in injured athletes.
Safety and Feasibility of the 6-Minute Walk Test in Patients with Acute Stroke.
Kubo, Hiroki; Nozoe, Masafumi; Yamamoto, Miho; Kamo, Arisa; Noguchi, Madoka; Kanai, Masashi; Mase, Kyoshi; Shimada, Shinichi
2018-06-01
Our objective was to investigate the safety and feasibility of the 6-minute walk test in patients with acute stroke. Consecutive patients with acute stroke, admitted to the Itami Kosei Neurosurgical Hospital from September 2016 to April 2017 were enrolled. Walking capacity was assessed by a physical therapist using the 6-minute walk test in 94 patients with acute stroke within 14 days of hospital admission. The primary outcomes were safety (i.e., the prevalence of new adverse events during and after the test) and feasibility (i.e., test completion rate) of the 6-minute walk test. The 6-minute walk test was performed for a mean duration of 5.1 days (standard deviation, 2.6 days) after hospital admission. Seventy patients (74.5%) could walk without standby assistance or a walking aid, and 24 patients (25.5%) could walk without standby assistance but with a walking aid. The average distance walked by patients during the 6-minute walk test was 331 m (standard deviation, 107.2 m). Adverse events following the 6-minute walk test occurred in 6 patients (6.4%) and included stroke progression, stroke recurrence, seizures, and neurological deterioration. Heart rate increase (>120 beats/min) occurred in 3 patients (3.2%) during the test. Lastly, 6 patients (6.4%) were unable to complete the 6-minute walk test. Although performance in the 6-minute walk test was decreased in patients with acute stroke, the test itself appears to be safe and feasible in this patient population. Copyright © 2018 National Stroke Association. Published by Elsevier Inc. All rights reserved.
Solar hot water system installed at Days Inn Motel, Dallas, Texas (Forrest Lane)
NASA Technical Reports Server (NTRS)
1980-01-01
The solar system was designed to provide 65 percent of the total Domestic Hot Water (DHW) demand. The liquid flat plate (water) collector (1,000 square feet) system automatically drains into the 1,000 gallon steel storage tank located in the mechanical room when the pump is not running. Heat is transferred from the storage tank to DHW tanks through a tube and shell heat exchanger. A circulating pump between the DHW tanks and the heat exchanger enables solar heated water to help make DHW tank standby losses. All pumps are controlled by differential temperature.
Performance evaluation of SPE electrolyzer for Space Station life support
NASA Technical Reports Server (NTRS)
Erickson, A. C.; Puskar, M. C.; Zagaja, J. A.; Miller, P. S.
1987-01-01
An static water-vapor feed electrolyzer has been developed as a candidate for Space Station life-support oxygen generation. The five-cell electrolysis module has eliminated the need for phase separation devices, pumps, and deionizers by transporting only water vapor to the solid polymer electrolyte cells. The introduction of an innovative electrochemical hydrogen pump allows the use of low-pressure reclaimed water to generate gas pressures of up to 230 psia. The electrolyzer has been tested in a computer-controlled test stand featuring continuous, cyclic, and standby operation (including automatic shutdown with fault detection).
Ingested bony foreign body abutting thoracic aorta
Leahy, Travis William; Kuthubutheen, Jafri
2011-01-01
The authors present the case of a 38-year-old female who presented with an ingested oesophageal foreign body (lamb bone) following consumption of a casserole. The bone was initially not seen on plain x-ray but CT imaging revealed a 21×20 mm pyramid shaped bone distending the proximal oesophageal mucosa and lodged only 2 mm from the aortic arch. Cardiothoracic surgery services were available on standby to perform an emergency thoracotomy in the event of any haemorrhage. However, the bone was removed successfully with rigid oesophagoscopy and the patient made a full recovery. PMID:22689831
CONTEMPT/LT-028 Browns Ferry studies of an anticipated transient without scram
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holcomb, E.E.
1983-01-01
The Browns Ferry Nuclear Plant containment response during the first 30 min of an anticipated transient without scram (ATWS) is the subject of this paper. Three cases, each initiated by a main steam isolation valve closure, are presented: the ATWS is mitigated by operator actions in the spirit of the General Electric Emergency Procedure Guidelines; the ATWS is managed by the plant automatic control systems; and the ATWS proceeds as in first case except that the drywell coolers are unavailable. Success of the standby liquid control system is assumed in the last two transients.
Hydrologic monitoring of a waste-injection well near Milton, Florida, June 1975 - June 1977
Pascale, Charles A.; Martin, J.B.
1978-01-01
This report presents the hydraulic and chemical data collected from June 1, 1975, when injection began, to June 30, 1977 through a monitoring program at a deep-well waste-injection system at the American Cyanamid Company's plant near Milton, about 12 miles northwest of Pensacola. The injection system consists of a primary injection well, a standby injection well, and two deep monitor wells all completed open hole in the lower limestone of the Floridan aquifer and one shallow-monitor well completed in the upper limestone of the Floridan aquifer. Two of the monitor wells and the standby injection well are used to observe hydraulic and geochemical effects of waste injection in the injection zone at locations 8,180 feet northeast, 1,560 feet south, and 1,025 feet southwest of the primary injection well. The shallow-monitor well, used to observe any effects in the first permeable zone above the 200-foot-thick confining bed, is 28 feet north of the primary injection well. Since injection began in June 1975, 607 million gallons of treated industrial liquid waste with a pH of 4.6 to 6.3 and containing high concentrations of nitrate, organic nitrogen and carbon have been injected into a saline-water-filled limestone aquifer. Wellhead pressure at the injection well in June 1977 average 137 pounds per square inch and the hydraulic pressure gradient was 0.53 pound per square inch per foot of depth to the top of the injection zone. Water levels rose from 36 to 74 feet at the three wells used to monitor the injection zone during the 25-month period. The water level in the shallow-monitor well declined about 8 feet. No changes were detected in the chemical character of water from the shallow-monitor well and deep-monitor well-north. Increases in concentration of bicarbonate and dissolved organic carbon were detected in water from the deep-test monitor well in February 1976 and at the standby injection well in August 1976. In addition to increases in bicarbonate and dissolved organic carbon, sulfate, total organic nitrogen, and total nitrogen concentrations have also increased substantially in samples from these wells. Nitrogen gas concentrations in water samples collected at the three deep-monitor wells ranged from 19 to 176 milligrams per liter, methane from 4.5 to 11.4 milligrams per liter, and carbon dioxide from 7.7 to 44 milligrams per liter. The most probable number of denitrifying bacteria in water samples collected at the three deep-monitor wells ranged from less than 2 colonies to 17 colonies per 100 milliliters. None of the water samples collected in April 1977 at the three deep-monitor wells showed positive concentrations of acetone, ethanol, methanol, or acrylonitrile.
Visiting Black Patients: Racial Disparities in Security Standby Requests.
Green, Carmen R; McCullough, Wayne R; Hawley, Jamie D
2018-02-01
Structural inequalities exist within healthcare. Racial disparities in hospital security standby requests (SSRs) have not been previously explored. We speculated hospital SSRs varied based upon race with black patients and their visitors negatively impacted. An 8-year retrospective study of hospital security dispatch information was performed. Data were analyzed to determine demographic information, and service location patterns for SSRs involving patients and their visitors. The race of the patient's visitors was imputed using the patient's race. The observed and expected (using hospital census data) number of patients impacted by SSRs was compared. Descriptive statistics were computed. Categorical data were analyzed using chi-square or Fisher exact test statistic. A p < 0.05 was statistically significant. The majority of the 1023 SSRs occurred for visitors of patients who were white (N = 642; 63%), female (56%), or < 21 years old (50.7%). However, SSRs differed significantly based upon the patient's race. Although Black patients represent 12% of the hospital population, they and their visitors were more than twice as likely (p < 0.0001) to have a SSR generated (N = 275; 27%) when compared to the visitors of both White and other (i.e., race unknown) patients (N = 106; 10%) combined (p < 0.0001). This study adds to the medical errors and healthcare disparities literature by being the first to describe racial disparities in SSRs for Black patients and their visitors. It also introduces the concept of "security intervention errors in healthcare environments." New metrics and continuous quality improvement initiatives are needed to understand and eliminate racial/ethnic based disparities in SSRs. Copyright © 2018 National Medical Association. Published by Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
...The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' Agencywide Documents Access and Management System (ADAMS) Accession No. ML102510119 for DC/ COL-ISG-021 and ADAMS Accession No. ML102510164 for Attachment 1 to DC/ COL-ISG-021. This ISG provides new guidance for applicants submitting a combined license (COL) or design certification (DC) application for new nuclear power reactors under Title 10 of the Code of Federal Regulations, part 52. In addition, it supplements the guidance provided to the NRC staff in NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' March 2007, Standard Review Plan (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate activities associated with NRC review of applications for DCs and COLs. The NRC staff intends to incorporate DC/COL-ISG-021 into the next revision of SRP Section 8.3.1 and Sections 9.5.4 through 9.5.8 and Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' June 2007. Disposition: On February 3, 2010, the NRC staff issued proposed DC/ COL-ISG-021 on ``Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' ADAMS Accession No. ML092640035. The NRC staff received comments on the proposed guidance. This final issuance resolves the majority of the comments. The NRC staff responses to these comments can be found in ADAMS Accession No. ML102510176.
Baaten, Gijs G; Geskus, Ronald B; Kint, Joan A; Roukens, Anna H E; Sonder, Gerard J; van den Hoek, Anneke
2011-01-01
Immunocompromised travelers to developing countries are thought to have symptomatic infectious diseases more often and longer than non-immunocompromised travelers. Evidence for this is lacking. This study evaluates whether immunocompromised short-term travelers are at increased risk of diseases. A prospective study was performed between October 2003 and May 2010 among adult travelers using immunosuppressive agents (ISA) and travelers with inflammatory bowel disease (IBD), with their non-immunocompromised travel companions serving as matched controls with comparable exposure to infection. Data on symptoms of infectious diseases were recorded by using a structured diary. Among 75 ISA, the incidence of travel-related diarrhea was 0.76 per person-month, and the number of symptomatic days 1.32 per month. For their 75 controls, figures were 0.66 and 1.50, respectively (p > 0.05). Among 71 IBD, the incidence was 1.19, and the number of symptomatic days was 2.48. For their 71 controls, figures were 0.73 and 1.31, respectively (p > 0.05). These differences also existed before travel. ISA had significantly more and longer travel-related signs of skin infection and IBD suffered more and longer from vomiting. As for other symptoms, no significant travel-related differences were found. Only 21% of immunocompromised travelers suffering from diarrhea used their stand-by antibiotics. ISA and IBD did not have symptomatic infectious diseases more often or longer than non-immunocompromised travelers, except for signs of travel-related skin infection among ISA. Routine prescription of stand-by antibiotics for these immunocompromised travelers to areas with good health facilities is probably not more useful than for healthy travelers. © 2011 International Society of Travel Medicine.
A non-volatile flip-flop based on diode-selected PCM for ultra-low power systems
NASA Astrophysics Data System (ADS)
Ye, Yong; Du, Yuan; Gao, Dan; Kang, Yong; Song, Zhitang; Chen, Bomy
2016-10-01
As the process technology is continuously shrinking, low power consumption is a major issue in VLSI Systems-on-Chip (SoCs), especially for standby-power-critical applications. Recently, the emerging CMOS-compatible non-volatile memories (NVMs), such as Phase Change Memory (PCM), have been used as on-chip storage elements, which can obtain non-volatile processing, nearly-zero standby power and instant-on capability. PCM has been considered as the best candidate for the next generation of NVMs for its low cost, high density and high resistance transformation ratio. In this paper, for the first time, we present a diode-selected PCM based non-volatile flip-flop (NVFF) which is optimized for better power consumption and process variation tolerance. With dual trench isolation process, the diode-selected PCM realizes ultra small area, which is very suitable for multi-context configuration and large scale flip-flops matrix. Since the MOS-selected PCM is hard to shrink further due to large amount of PCM write current, the proposed NVFF achieves higher power efficiency without loss of current driving capability. Using the 40nm manufacturing process, the area of the cell (1D1R) is as small as 0.016 μm2. Simulation results show that the energy consumption during the recall operation is 62 fJ with 1.1 standard supply voltage, which is reduced by 54.9% compared to the previous 2T2R based NVFF. When the supply voltage reduces to 0.7 V, the recall energy is as low as 17 fJ. With the great advantages in cell size and energy, the proposed diode-selected NVFF is very applicable and cost-effective for ULP systems.
Advance High Temperature Inspection Capabilities for Small Modular Reactors: Part 1 - Ultrasonics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bond, Leonard J.; Bowler, John R.
The project objective was to investigate the development non-destructive evaluation techniques for advanced small modular reactors (aSMR), where the research sought to provide key enabling inspection technologies needed to support the design and maintenance of reactor component performance. The project tasks for the development of inspection techniques to be applied to small modular reactor are being addressed through two related activities. The first is focused on high temperature ultrasonic transducers development (this report Part 1) and the second is focused on an advanced eddy current inspection capability (Part 2). For both inspection techniques the primary aim is to develop in-servicemore » inspection techniques that can be carried out under standby condition in a fast reactor at a temperature of approximately 250°C in the presence of liquid sodium. The piezoelectric material and the bonding between layers have been recognized as key factors fundamental for development of robust ultrasonic transducers. Dielectric constant characterization of bismuth scantanate-lead titanate ((1-x)BiScO 3-xPbTiO 3) (BS-PT) has shown a high Curie temperature in excess of 450°C , suitable for hot stand-by inspection in liquid metal reactors. High temperature pulse-echo contact measurements have been performed with BS-PT bonded to 12.5 mm thick 1018-low carbon steel plate from 20C up to 260 C. High temperature air-backed immersion transducers have been developed with BS-PT, high temperature epoxy and quarter wavlength nickel plate, needed for wetting ability in liquid sodium. Ultrasonic immersion measurements have been performed in water up to 92C and in silicone oil up to 140C. Physics based models have been validated with room temperature experimental data with benchmark artifical defects.« less
Investigation of the possibility of using residual heat reactor energy
NASA Astrophysics Data System (ADS)
Aminov, R. Z.; Yurin, V. E.; Bessonov, V. N.
2017-11-01
The largest contribution to the probable frequency of core damage is blackout events. The main component of the heat capacity at each reactor within a few minutes following a blackout is the heat resulting from the braking of beta-particles and the transfer of gamma-ray energy by the fission fragments and their decay products, which is known as the residual heat. The power of the residual heat changes gradually over a long period of time and for a VVER-1000 reactor is about 15-20 MW of thermal power over 72 hours. Current cooldown systems increase the cost of the basic nuclear power plants (NPP) funds without changing the amount of electricity generated. Such systems remain on standby, accelerating the aging of the equipment and accordingly reducing its reliability. The probability of system failure increases with the duration of idle time. Furthermore, the reactor residual heat energy is not used. A proposed system for cooling nuclear power plants involves the use of residual thermal power to supply the station’s own needs in emergency situations accompanied by a complete blackout. The thermal power of residual heat can be converted to electrical energy through an additional low power steam turbine. In normal mode, the additional steam turbine generates electricity, which makes it possible to ensure spare NPP and a return on the investment in the reservation system. In this work, experimental data obtained from a Balakovo NPP was analyzed to determine the admissibility of cooldown of the reactors through the 2nd circuit over a long time period, while maintaining high-level parameters for the steam generated by the steam generators.
Noir, Sandra; Bömer, Moritz; Takahashi, Naoki; Ishida, Takashi; Tsui, Tjir-Li; Balbi, Virginia; Shanahan, Hugh; Sugimoto, Keiko; Devoto, Alessandra
2013-01-01
Phytohormones regulate plant growth from cell division to organ development. Jasmonates (JAs) are signaling molecules that have been implicated in stress-induced responses. However, they have also been shown to inhibit plant growth, but the mechanisms are not well understood. The effects of methyl jasmonate (MeJA) on leaf growth regulation were investigated in Arabidopsis (Arabidopsis thaliana) mutants altered in JA synthesis and perception, allene oxide synthase and coi1-16B (for coronatine insensitive1), respectively. We show that MeJA inhibits leaf growth through the JA receptor COI1 by reducing both cell number and size. Further investigations using flow cytometry analyses allowed us to evaluate ploidy levels and to monitor cell cycle progression in leaves and cotyledons of Arabidopsis and/or Nicotiana benthamiana at different stages of development. Additionally, a novel global transcription profiling analysis involving continuous treatment with MeJA was carried out to identify the molecular players whose expression is regulated during leaf development by this hormone and COI1. The results of these studies revealed that MeJA delays the switch from the mitotic cell cycle to the endoreduplication cycle, which accompanies cell expansion, in a COI1-dependent manner and inhibits the mitotic cycle itself, arresting cells in G1 phase prior to the S-phase transition. Significantly, we show that MeJA activates critical regulators of endoreduplication and affects the expression of key determinants of DNA replication. Our discoveries also suggest that MeJA may contribute to the maintenance of a cellular “stand-by mode” by keeping the expression of ribosomal genes at an elevated level. Finally, we propose a novel model for MeJA-regulated COI1-dependent leaf growth inhibition. PMID:23439917
Baseline Assessment of TREAT for Modeling and Analysis Needs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bess, John Darrell; DeHart, Mark David
2015-10-01
TREAT is an air-cooled, graphite moderated, thermal, heterogeneous test facility designed to evaluate reactor fuels and structural materials under conditions simulating various types of nuclear excursions and transient undercooling situations that could occur in a nuclear reactor. After 21 years in a standby mode, TREAT is being re-activated to revive transient testing capabilities. Given the time elapsed and the concurrent loss of operating experience, current generation and advanced computational methods are being applied to begin TREAT modeling and simulation prior to renewed at-power operations. Such methods have limited value in predicting the behavior of TREAT without proper validation. Hence, themore » U.S. DOE has developed a number of programs to support development of benchmarks for both critical and transient operations. Extensive effort has been expended at INL to collect detailed descriptions, drawings and specifications for all aspects of TREAT, and to resolve conflicting data found through this process. This report provides a collection of these data, with updated figures that are significantly more readable than historic drawings and illustrations, compositions, and dimensions based on the best available sources. This document is not nor should it be considered to be a benchmark report. Rather, it is intended to provide one-stop shopping, to the extent possible, for other work that seeks to prepare detailed, accurate models of the core and its components. Given the nature of the variety of historic documents available and the loss of institutional memory, the only completely accurate database of TREAT data is TREAT itself. Unfortunately, disassembly of TREAT for inspection, assay, and measurement is highly unlikely. Hence the data provided herein is intended serve as a best-estimate substitute.« less
NASA Technical Reports Server (NTRS)
Issa, T. N.
1992-01-01
The results of the reliability and availability analyses of the individual S- and X-band traveling-wave maser (TWM) assemblies and their operational configurations in the 70-meter antennas of NASA's Deep Space Network (DSN) are described. For the period 1990 through 1991, the TWM availability parameters for the Telemetry Data System are: mean time between failures (MTBF), 930 hr; mean time to restore services (MTTRS), 1.4 hr; and the average availability, 99.85 percent. In previously published articles, the performance analysis of the TWM assemblies was confined to the determination of the parameters specified above. However, as the mean down time (MDT) for the repair of TWM's increases, the levels of the TWM operational availabilities and MTTRS are adversely affected. A more comprehensive TWM availability analysis is presented to permit evaluation of both MTBF and MDT effects. Performance analysis of the TWM assemblies, based on their station monthly failure reports, indicates that the TWM's required MTBF and MDT levels of 3000 hr and 36 to 48 hr, respectively, have been achieved by the TWM's only at the Canberra Deep Space Station (DSS 43). The Markov Process technique is employed to develop suitable availability measures for the S- and X-band TWM configurations when each is operated in a two-assembly standby mode. The derived stochastic expressions allow for the evaluation of those configurations' simultaneous availability for the Antenna Microwave Subsystem. The application of these expressions to demonstrate the impact of various levels of TWM maintainability (or MDT) on their configurations' operational availabilities is presented for each of the 70-m antenna stations.
Unexpected death of a ventilator-dependent amyotrophic lateral sclerosis patient.
di Paolo, M; Evangelisti, L; Ambrosino, N
2013-01-01
Amyotrophic lateral sclerosis (ALS) is a fatal, progressive, neurodegenerative disease and most patients affected die of respiratory compromise and/or pneumonia within 2-3 years of diagnosis. As ALS progresses, ventilator assistance is required. In the end stages of the disease, patients suffer from respiratory failure and may become ventilator-dependent. Deaths due to malfunction of mechanical ventilators are reported but there are very few forensic autopsy records. We report the case of a 69-year-old ALS female ventilator-dependent, trachostomised patient who was found dead by her husband, with the ventilator in "stand-by" mode. A forensic autopsy was performed. Samples of internal organs were taken for histological and toxicological examination. The ventilator internal memory was also analysed and tested in order to find possible malfunction. Gross examination did not reveal any sign of trauma but showed brain and lung congestion. Pulmonary histological examination revealed thickening of peribronchial interstitial space, alveolar over-distension, break of inter-alveolar walls and diffuse alveolar haemorrhages. Focal microhemorrhages were also detected in other organs. Analysis of the ventilator internal memory showed that during the night of death, there had been several voltage drops. Specific tests revealed malfunction of the internal battery which was unable to provide the necessary voltage, as a consequence the ventilator switched off, stopping ventilation. Battery malfunction reduced the volume of the ventilator alarm, which was not heard by the caregiver. Histological pattern, with acute pulmonary emphysema and focal polivisceral haemorrhages, is strongly suggestive of a death due to "acute" asphyxia. The authors also discuss the need for strict supervision and follow up of these ventilatory dependent patients and their devices. Copyright © 2012 Sociedade Portuguesa de Pneumologia. Published by Elsevier España. All rights reserved.
NASA Astrophysics Data System (ADS)
Salvatore, Scaglione; di Sarcina, Ilaria; Flori, Daniele; Menchini, Francesca
2010-05-01
Filter radiometers measure the solar radiation in several channels (typically 4 to 7) with a bandwith from 2 to 10 nm. They require less maintenance than the spectroradiometer and they are able to work in hostile environment as for instance the polar regions. The spectral resolution depends on the width at half maximum (FWHM) of the filters and is generally lower than the spectroradiometer resolution (0.5 nm). Other than the robustness of this instruments, the main advantage of the filter radiometers is the high frequency with which all wavelengths can be measured, making this class of instrument well suited for investigating short term irradiance variation. In this work is presented the results of UV irradiance measurements performed by a very narrow band (FWHM less than 1 nm) filter radiometer at Antarctica Italia Base, Mario Zucchelli Station, Terranova Bay, lat. 74° 41.6084' south and lon. 164° 05.9224' est. All-dielectric Fabry-Perot filters were manufactured in the laboratories of the Optical Coating Group, ENEA, by the ion beam assistance physical vapor deposition technique. Nine filters select nine different wavelengths in the UV spectral range from 296.5 nm to 377 nm with about 1 minute of measurement period, i.e. each wavelength is measured about 1250 times per day. At the moment the radiometer are permanently located near MZS and the data are daily downloaded in ENEA, Rome, by a dedicated satellite channel. During the Antarctica winter the radiometer will be in standby mode, in this season MZS is closed, and it will be start to measure again in the Antarctica spring.
Microwave emissions from police radar.
Fink, J M; Wagner, J P; Congleton, J J; Rock, J C
1999-01-01
This study evaluated police officers' exposures to microwaves emitted by traffic radar units. Exposure measurements were taken at approximated ocular and testicular levels of officers seated in patrol vehicles. Comparisons were made of the radar manufacturers' published maximum power density specifications and actual measured power densities taken at the antenna faces of those units. Four speed-enforcement agencies and one transportation research institute provided 54 radar units for evaluation; 17 different models, encompassing 4 frequency bands and 3 antenna configurations, were included. Four of the 986 measurements taken exceeded the 5 mW/cm2 limit accepted by the International Radiation Protection Association and the National Council on Radiation Protection and Measurement, though none exceeded the American Conference of Governmental Industrial Hygienists, American National Standards Institute, Institute of Electrical and Electronic Engineers, or Occupational Safety and Health Administration standard of 10 mW/cm2. The four high measurements were maximum power density readings taken directly in front of the radar. Of the 812 measurements taken at the officers' seated ocular and testicular positions, none exceeded 0.04 mW/cm2; the highest of these (0.034 mW/cm2) was less than 1% of the most conservative current safety standards. High exposures in the limited region directly in front of the radar aperture are easily avoided with proper training. Results of this study indicate that police officer exposure to microwave radiation is apparently minimal. However, because of uncertainty in the medical and scientific communities concerning nonionizing radiation, it is recommended that law enforcement agencies implement a policy of prudent avoidance, including purchasing units with the lowest published maximum power densities, purchasing dash/rear deck-mounted units with antennae mounted outside the patrol vehicle, and training police officers to use the "stand-by" mode when not actually using radar.
Appendix to HDC 2118 design criteria 100-X reactor water plant, general description - section II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1952-03-29
The factors responsible for the advances of 100-X compared with the older areas are: Simplification of the process, such as elimination of separate process water clearwells, by having the filtered water reservoirs perform that function. Combination of separate buildings into one building, such as combining filter pump house and process pump house. Use of electric standby. Use of higher capacity pumps and filter basins, and so fewer number of units. Centralization of control and operation. More compact arrangement of plant components. Use of waste heat for space heating, recovered from reactor effluent, backed up by steam plant.
Flexible robotic entry device for a nuclear materials production reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heckendorn, F.M. II
1988-01-01
The Savannah River Laboratory has developed and is implementing a flexible robotic entry device (FRED) for the nuclear materials production reactors now operating at the Savannah River Plant (SRP). FRED is designed for rapid deployment into confinement areas of operating reactors to assess unknown conditions. A unique smart tether method has been incorporated into FRED for simultaneous bidirectional transmission of multiple video/audio/control/power signals over a single coaxial cable. This system makes it possible to use FRED under all operating and standby conditions, including those where radio/microwave transmissions are not possible or permitted, and increases the quantity of data available.
Military helicopter cockpit modernization
NASA Astrophysics Data System (ADS)
Hall, Andrew S.
2001-09-01
This paper describes some of the initiatives being progressed by Smiths Aerospace to enhance the operational effectiveness of military helicopters, with particular emphasis on the GWHL Lynx and EH Industries EH101 programs. The areas discussed include engine instrumentation, flight instrumentation and the mission system displays. Various Crew Stations are described which provide a suite of AMLCD displays which: -Integrate information from the aircraft engine, electrical power and hydraulic systems onto 5ATI displays -Integrate primary flight, navigation and mission system sensor information onto large area (61/4' square or 6' by 8') displays -Provide standby attitude and air data information in the event of major system failure on 3ATI displays.
Optimum spaceborne computer system design by simulation
NASA Technical Reports Server (NTRS)
Williams, T.; Weatherbee, J. E.; Taylor, D. S.
1972-01-01
A deterministic digital simulation model is described which models the Automatically Reconfigurable Modular Multiprocessor System (ARMMS), a candidate computer system for future manned and unmanned space missions. Use of the model as a tool in configuring a minimum computer system for a typical mission is demonstrated. The configuration which is developed as a result of studies with the simulator is optimal with respect to the efficient use of computer system resources, i.e., the configuration derived is a minimal one. Other considerations such as increased reliability through the use of standby spares would be taken into account in the definition of a practical system for a given mission.
Remotely Powered Reconfigurable Receiver for Extreme Environment Sensing Platforms
NASA Technical Reports Server (NTRS)
Sheldon, Douglas J.
2012-01-01
Wireless sensors connected in a local network offer revolutionary exploration capabilities, but the current solutions do not work in extreme environments of low temperatures (200K) and low to moderate radiation levels (<50 krad). These sensors (temperature, radiation, infrared, etc.) would need to operate outside the spacecraft/ lander and be totally independent of power from the spacecraft/lander. Flash memory field-programmable gate arrays (FPGAs) are being used as the main signal processing and protocol generation platform in a new receiver. Flash-based FPGAs have been shown to have at least 100 reduced standby power and 10 reduction operating power when compared to normal SRAM-based FPGA technology.
FIEStool: Automated data reduction for FIber-fed Echelle Spectrograph (FIES)
NASA Astrophysics Data System (ADS)
Stempels, Eric; Telting, John
2017-08-01
FIEStool automatically reduces data obtained with the FIber-fed Echelle Spectrograph (FIES) at the Nordic Optical Telescope, a high-resolution spectrograph available on a stand-by basis, while also allowing the basic properties of the reduction to be controlled in real time by the user. It provides a Graphical User Interface and offers bias subtraction, flat-fielding, scattered-light subtraction, and specialized reduction tasks from the external packages IRAF (ascl:9911.002) and NumArray. The core of FIEStool is instrument-independent; the software, written in Python, could with minor modifications also be used for automatic reduction of data from other instruments.
Aircraft-Fuel-Tank Design for Liquid Hydrogen
NASA Technical Reports Server (NTRS)
Reynolds, T W
1955-01-01
Some of the considerations involved in the design of aircraft fuel tanks for liquid hydrogen are discussed herein. Several of the physical properties of metals and thermal insulators in the temperature range from ambient to liquid-hydrogen temperatures are assembled. Calculations based on these properties indicate that it is possible to build a large-size liquid-hydrogen fuel tank which (1) will weigh less then 15 percent of the fuel weight, (2) will have a hydrogen vaporization rate less than 30 percent of the cruise fuel-flow rate, and (3) can be held in a stand-by condition and readied for flight in a short time.
Historic Properties Report. Sunflower Army Ammunition Plant, Desoto, Kansas.
1984-08-01
the plant produced amonium nitrate liquor for two years before entering "standby" status. The SFAAP was rehabilitated and reactivated in 1951 for... D -A175 882 HISTORIC PROPERTIES REPORT SUNFLOWER RMY AMUNITION ±, PLANT DESOTO KANSAS(U) BUILDING TECHNOLOGY INC SILVER UNCR7SIFEDSPRING ND R...33.6 I..11111 120 11111 II L - i.E ~L.. 111111.25 flfflI4 fl 16 t’Ca.. .5 ’C ’C ’C ’C a. ’a ’I B-J 4 S ’a 4 N t C,. ’C di. ’aI. .5 a .* d
INNOVATIVE HYBRID GAS/ELECTRIC CHILLER COGENERATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Todd Kollross; Mike Connolly
2004-06-30
Engine-driven chillers are quickly gaining popularity in the market place (increased from 7,000 tons in 1994 to greater than 50,000 tons in 1998) due to their high efficiency, electric peak shaving capability, and overall low operating cost. The product offers attractive economics (5 year pay back or less) in many applications, based on areas cooling requirements and electric pricing structure. When heat is recovered and utilized from the engine, the energy resource efficiency of a natural gas engine-driven chiller is higher than all competing products. As deregulation proceeds, real time pricing rate structures promise high peak demand electric rates, butmore » low off-peak electric rates. An emerging trend with commercial building owners and managers who require air conditioning today is to reduce their operating costs by installing hybrid chiller systems that combine gas and electric units. Hybrid systems not only reduce peak electric demand charges, but also allow customers to level their energy load profiles and select the most economical energy source, gas or electricity, from hour to hour. Until recently, however, all hybrid systems incorporated one or more gas-powered chillers (engine driven and/or absorption) and one or more conventional electric units. Typically, the cooling capacity of hybrid chiller plants ranges from the hundreds to thousands of refrigeration tons, with multiple chillers affording the user a choice of cooling systems. But this flexibility is less of an option for building operators who have limited room for equipment. To address this technology gap, a hybrid chiller was developed by Alturdyne that combines a gas engine, an electric motor and a refrigeration compressor within a single package. However, this product had not been designed to realize the full features and benefits possible by combining an engine, motor/generator and compressor. The purpose of this project is to develop a new hybrid chiller that can (1) reduce end-user energy costs, (2) lower building peak electric load, (3) increase energy efficiency, and (4) provide standby power. This new hybrid product is designed to allow the engine to generate electricity or drive the chiller's compressor, based on the market price and conditions of the available energy sources. Building owners can minimize cooling costs by operating with natural gas or electricity, depending on time of day energy rates. In the event of a backout, the building owner could either operate the product as a synchronous generator set, thus providing standby power, or continue to operate a chiller to provide air conditioning with support of a small generator set to cover the chiller's electric auxiliary requirements. The ability to utilize the same piece of equipment as a hybrid gas/electric chiller or a standby generator greatly enhances its economic attractiveness and would substantially expand the opportunities for high efficiency cooling products.« less
Malaria Prophylaxis: A Comprehensive Review
Castelli, Francesco; Odolini, Silvia; Autino, Beatrice; Foca, Emanuele; Russo, Rosario
2010-01-01
The flow of international travellers to and from malaria-endemic areas, especially Africa, has increased in recent years. Apart from the very high morbidity and mortality burden imposed on malaria-endemic areas, imported malaria is the main cause of fever possibly causing severe disease and death in travellers coming from tropical and subtropical areas, particularly Sub-Saharan Africa. The importance of behavioural preventive measures (bed nets, repellents, etc.), adequate chemoprophylaxis and, in selected circumstances, stand-by emergency treatment may not be overemphasized. However, no prophylactic regimen may offer complete protection. Expert advice is needed to tailor prophylactic advice according to traveller (age, baseline clinical conditions, etc.) and travel (destination, season, etc.) characteristics in order to reduce malaria risk.
Environmental readiness pilot study at the Badger Army Ammunition Plant, Baraboo, Wisconsin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, D.; Bhinge, D.; Patel, J.
1994-12-31
The Badger Army Ammunition Plant (BAAP) has been on standby status since the mid-1970s, prior to the enactment of the majority of Federal environmental regulations. As a result, BAAP is unprepared to begin production without the implementation of pollution prevention and treatment measures. The Army contracted SAIC to conduct a pilot study to develop an environmental readiness plan for BAAP in the event that the plant is reactivated to produce explosives and propellants for ammunition requirements during mobilization. This paper describes the process developed by SAIC to conduct this pilot study at BAAP and the relationship between this effort andmore » the Army`s overall environmental mission.« less
NASA Technical Reports Server (NTRS)
Thomas, Scott R.; Lee, Jinho; Stephens, John W.; Hostler, Robert W., Jr.; VonKamp, William D.
2010-01-01
The Hypersonic Tunnel Facility (HTF) located at the NASA Glenn Research Center s Plum Brook Station in Sandusky, Ohio, is the nation s only large-scale, non-vitiated, hypersonic propulsion test facility. The HTF, with its 4-story graphite induction heater, is capable of duplicating Mach 5, 6, and 7 flight conditions. This unique propulsion system test facility has experienced several standby and reactivation cycles. The intent of the paper is to overview the HTF capabilities to the propulsion community, present the current status of HTF, and share the lessons learned from putting a large-scale facility into mothball status for a later restart
Low-power wireless medical sensor platform.
Dolgov, Arseny B; Zane, Regan
2006-01-01
Long-term, low duty cycle monitoring of patients with a variety of disabilities or health concerns is often required. In this paper, we discuss the design considerations and implementation of an ultra-low power wireless medical sensor platform, suitable for a wide range of medical and sports applications. A hardware demonstration prototype based on readily available components is presented with sensors for 3-axis acceleration, temperature and galvanic skin response. Detailed power measurements and operation results are shown, demonstrating a sensor life span of more than 10 years on a single 200 mAh lithium watch battery using low current standby techniques with an average power of less than 5 muW and a 10 second sample interval.
Collaborative Workspaces to Accelerate Discovery
NASA Astrophysics Data System (ADS)
Meade, Bernard; Fluke, Christopher; Cooke, Jeff; Andreoni, Igor; Pritchard, Tyler; Curtin, Christopher; Bernard, Stephanie R.; Asher, Albany; Mack, Katherine J.; Murphy, Michael T.; Vohl, Dany; Codoreanu, Alex; Kotuš, Srđan M.; Rumokoy, Fanuel; Horst, Chuck; Reynolds, Tristan
2017-05-01
By applying a display ecology to the Deeper, Wider, Faster proactive, simultaneous telescope observing campaign, we have shown a dramatic reduction in the time taken to inspect DECam CCD images for potential transient candidates and to produce time-critical triggers to standby telescopes. We also show how facilitating rapid corroboration of potential candidates and the exclusion of non-candidates improves the accuracy of detection; and establish that a practical and enjoyable workspace can improve the experience of an otherwise taxing task for astronomers. We provide a critical road test of two advanced displays in a research context-a rare opportunity to demonstrate how they can be used rather than simply discuss how they might be used to accelerate discovery.
2. Credit BG. The northwest and southwest sides of the ...
2. Credit BG. The northwest and southwest sides of the building appear as seen when looking northeast (38°). (Photo taken from location near Building 4275/E-76, Standby Generator.) Note the extent of the barricades. On the corner of the roof at the extreme right of this view appears a small funnel; according to JPL personnel, this device collected rainwater and conducted it through a pipe which appears at the corner of the building below. The water was used to flush any wastes from the nearby drainage trenches in the exterior concrete pads. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
NASA Astrophysics Data System (ADS)
Hirayama, Hideo; Kondo, Kenjiro; Suzuki, Seishiro; Hamamoto, Shimpei; Iwanaga, Kohei
2017-09-01
Pulse height distributions were measured using a LaBr3 detector set in a 1 cm lead collimator to investigate main radiation source at the operation floor of Fukushima Daiichi Nuclear Power Station Unit 4. It was confirmed that main radiation source above the reactor well was Co-60 from the activated steam dryer in the DS pool (Dryer-Separator pool) and that at the standby area was Cs-134 and Cs-137 from contaminated buildings and debris at the lower floor. Full energy peak count rate of Co-60 was reduced about 1/3 by 12mm lead sheet placed on the floor of the fuel handling machine.
Study of fuel cell thermal control systems for advanced missions.
NASA Technical Reports Server (NTRS)
Caputo, R. S.
1972-01-01
This study evaluated many heat rejection and thermal control concepts which could be applied to fuel cells for long term (600 hours) orbital and lunar surface missions. The concepts considered several types of radiators which utilized pumped gas, liquid and two phase working fluids and incorporated solid conduction fins as well as heat pipe (vapor chamber) fins. The comparison of the concepts was based on weight, area and other factors such as standby power, ability to accommodate heat load variation, control complexity, and meteoroid survival capability. A design selection matrix was established and an optimum (primary) and an alternate (secondary) heat rejection concept was chosen. Heat rejection techniques utilizing self-controlled heat pipe radiators dominate the results.
Design of on-board Bluetooth wireless network system based on fault-tolerant technology
NASA Astrophysics Data System (ADS)
You, Zheng; Zhang, Xiangqi; Yu, Shijie; Tian, Hexiang
2007-11-01
In this paper, the Bluetooth wireless data transmission technology is applied in on-board computer system, to realize wireless data transmission between peripherals of the micro-satellite integrating electronic system, and in view of the high demand of reliability of a micro-satellite, a design of Bluetooth wireless network based on fault-tolerant technology is introduced. The reliability of two fault-tolerant systems is estimated firstly using Markov model, then the structural design of this fault-tolerant system is introduced; several protocols are established to make the system operate correctly, some related problems are listed and analyzed, with emphasis on Fault Auto-diagnosis System, Active-standby switch design and Data-Integrity process.
1980-05-19
Maze20 30OA lCeI SeM- ,aO50 BK.O~K~jlbo10 0 75 indust--iaj. ant-~rpr-,s!s, baicu ria vr the total1 vc lum-i of raservcirs -4t is more than 500 Mn3, or...liquefied gas shcula Le deterrfined in depending cr accepted fcr this indutria1 entezirisp rora fcr stcrage of standby fuel / vr ooellant. DcC = 30CL42901 34...degree cf refractoriness (fcr example, theaters, cinemas , clubs, touses cf culture, therapeutic and childrengs institutions, educational institutions
Outage maintenance checks on large generator windings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nindra, B.; Jeney, S.I.; Slobodinsky, Y.
In the present days of austerity, more constraints and pressures are being brought on the maintenance engineers to certify the generators for their reliability and life extension. The outages are shorter and intervals between the outages are becoming longer. The annual outages were very common when utilities had no regulatory constraints and also had standby capacities. Furthermore, due to lean and mean budgets, outage maintenance programs are being pursued more aggressively, so that longer interval outages can be achieved to ensure peak generator performance. This paper will discuss various visual checks, electrical tests and recommended fixes to achieve the abovemore » mentioned objectives, in case any deficiencies are found.« less
2011-08-01
Recommendation: Smartphone/ Android technology and the creation of “ Apps ” for emergency management tools should be considered essential for the...and Training Center …………………………………………………….. 14 6.2 Communications ………………………………………………………………………………….. 17 6.2.1 Android ...effectively. Monmouth University’s Android application was not handling COGs effectively. The programmer’s (doctoral students) were on constant standby
DeHart, Mark D.; Baker, Benjamin A.; Ortensi, Javier
2017-07-27
The Transient Test Reactor (TREAT) at Idaho National Laboratory will resume operations in late 2017 after a 23 year hiatus while maintained in a cold standby state. Over that time period, computational power and simulation capabilities have increased substantially and now allow for new multiphysics modeling possibilities that were not practical or feasible for most of TREAT's operational history. Hence the return of TREAT to operational service provides a unique opportunity to apply state-of-the-art software and associated methods in the modeling and simulation of general three-dimensional steady state and kinetic behavior for reactor operation, and for coupling of the coremore » power transient model to experiment simulations. However, measurements taken in previous operations were intended to predict power deposition in experimental samples, with little consideration of three-dimensional core power distributions. Hence, interpretation of data for the purpose of validation of modern methods can be challenging. For the research discussed herein, efforts are described for the process of proper interpretation of data from the most recent calibration experiments performed in the core, the M8 calibration series (M8-CAL). These measurements were taken between 1990 and 1993 using a set of fission wires and test fuel pins to estimate the power deposition that would be produced in fast reactor test fuel pins during the M8 experiment series. Because of the decision to place TREAT into a standby state in 1994, the M8 series of transients were never performed. However, potentially valuable information relevant for validation is available in the M8-CAL measurement data, if properly interpreted. This article describes the current state of the process of recovery of useful data from M8-CAL measurements and quantification of biases and uncertainties to potentially apply to the validation of multiphysics methods.« less
Boubaker, Rim; Hérard Fossati, Annie; Meige, Pierrette; Mialet, Catherine; Ngarambe Buffat, Chantal; Rochat, Jacynthe; Souvannaraj-Blanchant, Manisinh; Uwanyiligira, Mediatrice; Widmer, Francine; Payot, Sylvie; Rochat, Laurence; de Vallière, Serge; D'Acremont, Valérie; Genton, Blaise
2017-09-01
There are several possible malaria prevention strategies for travellers. In Switzerland, chemoprophylaxis (CP) is recommended for persons visiting areas highly endemic for malaria and stand-by emergency treatment (SBET) for areas with moderate to low risk. To describe the type of malaria prevention prescribed to travel clinic attendees with a specific focus on changes over time following adaptation of recommendations. All pre-travel first consultation data recorded between November 2002 and December 2012 were included. Country-specific malaria preventive recommendations provided and medicines prescribed over time were analysed. In total, 64 858 client-trips were recorded. 91% of travellers planned to visit a malaria endemic country. Among those clients, 42% were prescribed an antimalarial medicine as CP only, 36% as SBET only, and 3% both. Between 2002 and 2012, there was a 16% drop of CP prescription ( P < 0.001) and a 21% increase of SBET prescription ( P < 0.001). Among travellers receiving CP, the proportion of those prescribed mefloquine dropped from 82% in 2002 to 46% in 2012 while those prescribed atovaquone-proguanil (AP) increased from 7% to 39%. For those prescribed SBET, the proportion dropped from 46% to 30% for AP and increased from 2% to 61% for artemether-lumefantrine. CP prescription for travellers to India fell from 62% to 5% and SBET prescription increased from 40% to 88% after the change of recommendation from CP to SBET in 2005 for this country. Comparatively, CP prescription for travellers to Senegal, for which no change of recommendation occurred, remained relatively stable between 88% in 2002 and 89% in 2012. This study shows the considerable decline of antimalarial prescription for chemoprophylaxis that occurred over the 10-year period in favour of SBET. © International Society of Travel Medicine, 2017. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com
Orthopedic resident work-shift analysis: are we making the best use of resident work hours?
Hamid, Kamran S; Nwachukwu, Benedict U; Hsu, Eugene; Edgerton, Colston A; Hobson, David R; Lang, Jason E
2014-01-01
Surgery programs have been tasked to meet rising demands in patient surgical care while simultaneously providing adequate resident training in the midst of increasing resident work-hour restrictions. The purpose of this study was to quantify orthopedic surgery resident workflow and identify areas needing improved resident efficiency. We hypothesize that residents spend a disproportionate amount of time involved in activities that do not relate directly to patient care or maximize resident education. We observed 4 orthopedic surgery residents on the orthopedic consult service at a major tertiary care center for 72 consecutive hours (6 consecutive shifts). We collected minute-by-minute data using predefined work-task criteria: direct new patient contact, direct existing patient contact, communications with other providers, documentation/administrative time, transit time, and basic human needs. A seventh category comprised remaining less-productive work was termed as standby. In a 720-minute shift, residents spent on an average: 191 minutes (26.5%) performing documentation/administrative duties, 167.0 minutes (23.2%) in direct contact with new patient consults, 129.6 minutes (17.1%) in communication with other providers regarding patients, 116.2 (16.1%) minutes in standby, 63.7 minutes (8.8%) in transit, 32.6 minutes (4.5%) with existing patients, and 20 minutes (2.7%) attending to basic human needs. Residents performed an additional 130 minutes of administrative work off duty. Secondary analysis revealed residents were more likely to perform administrative work rather than directly interact with existing patients (p = 0.006) or attend to basic human needs (p = 0.003). Orthopedic surgery residents spend a large proportion of their time performing documentation/administrative-type work and their workday can be operationally optimized to minimize nonvalue-adding tasks. Formal workflow analysis may aid program directors in systematic process improvements to better align resident skills with tasks. III. Published by Elsevier Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeHart, Mark D.; Baker, Benjamin A.; Ortensi, Javier
The Transient Test Reactor (TREAT) at Idaho National Laboratory will resume operations in late 2017 after a 23 year hiatus while maintained in a cold standby state. Over that time period, computational power and simulation capabilities have increased substantially and now allow for new multiphysics modeling possibilities that were not practical or feasible for most of TREAT's operational history. Hence the return of TREAT to operational service provides a unique opportunity to apply state-of-the-art software and associated methods in the modeling and simulation of general three-dimensional steady state and kinetic behavior for reactor operation, and for coupling of the coremore » power transient model to experiment simulations. However, measurements taken in previous operations were intended to predict power deposition in experimental samples, with little consideration of three-dimensional core power distributions. Hence, interpretation of data for the purpose of validation of modern methods can be challenging. For the research discussed herein, efforts are described for the process of proper interpretation of data from the most recent calibration experiments performed in the core, the M8 calibration series (M8-CAL). These measurements were taken between 1990 and 1993 using a set of fission wires and test fuel pins to estimate the power deposition that would be produced in fast reactor test fuel pins during the M8 experiment series. Because of the decision to place TREAT into a standby state in 1994, the M8 series of transients were never performed. However, potentially valuable information relevant for validation is available in the M8-CAL measurement data, if properly interpreted. This article describes the current state of the process of recovery of useful data from M8-CAL measurements and quantification of biases and uncertainties to potentially apply to the validation of multiphysics methods.« less
A Method to Assess Flux Hazards at CSP Plants to Reduce Avian Mortality
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, Clifford K.; Wendelin, Timothy; Horstman, Luke
A method to evaluate avian flux hazards at concentrating solar power plants (CSP) has been developed. A heat-transfer model has been coupled to simulations of the irradiance in the airspace above a CSP plant to determine the feather temperature along prescribed bird flight paths. Probabilistic modeling results show that the irradiance and assumed feather properties (thickness, absorptance, heat capacity) have the most significant impact on the simulated feather temperature, which can increase rapidly (hundreds of degrees Celsius in seconds) depending on the parameter values. The avian flux hazard model is being combined with a plant performance model to identify alternativemore » heliostat standby aiming strategies that minimize both avian flux hazards and negative impacts on plant performance.« less
Reliability Considerations of ULP Scaled CMOS in Spacecraft Systems
NASA Technical Reports Server (NTRS)
White, Mark; MacNeal, Kristen; Cooper, Mark
2012-01-01
NASA, the aerospace community, and other high reliability (hi-rel) users of advanced microelectronic products face many challenges as technology continues to scale into the deep sub-micron region. Decreasing the feature size of CMOS devices not only allows more components to be placed on a single chip, but it increases performance by allowing faster switching (or clock) speeds with reduced power compared to larger scaled devices. Higher performance, and lower operating and stand-by power characteristics of Ultra-Low Power (ULP) microelectronics are not only desirable, but also necessary to meet low power consumption design goals of critical spacecraft systems. The integration of these components in such systems, however, must be balanced with the overall risk tolerance of the project.
Task 6 -- Advanced turbine systems program conceptual design and product development
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-10
The Allison Engine Company has completed the Task 6 Conceptual Design and Analysis of Phase 2 of the Advanced Turbine System (ATS) contract. At the heart of Allison`s system is an advanced simple cycle gas turbine engine. This engine will incorporate components that ensure the program goals are met. Allison plans to commercialize the ATS demonstrator and market a family of engines incorporating this technology. This family of engines, ranging from 4.9 MW to 12 MW, will be suitable for use in all industrial engine applications, including electric power generation, mechanical drive, and marine propulsion. In the field of electricmore » power generation, the engines will be used for base load, standby, cogeneration, and distributed generation applications.« less
A method to assess flux hazards at CSP plants to reduce avian mortality
NASA Astrophysics Data System (ADS)
Ho, Clifford K.; Wendelin, Timothy; Horstman, Luke; Yellowhair, Julius
2017-06-01
A method to evaluate avian flux hazards at concentrating solar power plants (CSP) has been developed. A heat-transfer model has been coupled to simulations of the irradiance in the airspace above a CSP plant to determine the feather temperature along prescribed bird flight paths. Probabilistic modeling results show that the irradiance and assumed feather properties (thickness, absorptance, heat capacity) have the most significant impact on the simulated feather temperature, which can increase rapidly (hundreds of degrees Celsius in seconds) depending on the parameter values. The avian flux hazard model is being combined with a plant performance model to identify alternative heliostat standby aiming strategies that minimize both avian flux hazards and negative impacts on plant performance.