Sample records for startup program update

  1. Wind-turbine-performance assessment

    NASA Astrophysics Data System (ADS)

    Vachon, W. A.

    1982-06-01

    An updated summary of recent test data and experiences is reported from both federally and privately funded large wind turbine (WT) development and test programs, and from key WT programs in Europe. Progress and experiences on both the cluster of three MOD-2 2.5-MW WT's, the MOD-1 2-MW WT, and other WT installations are described. An examination of recent test experiences and plans from approximately five privately funded large WT programs in the United States indicates that, during machine checkout and startup, technical problems are identified, which require and startup, a number of technical problems are identified, which will require design changes and create program delays.

  2. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  3. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  4. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  5. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  6. >venture>: Support for Early Stage Start-ups and Potential Entrepreneurs.

    PubMed

    Kauz, Lukas

    2014-12-01

    >venture>, the leading Swiss-wide business plan competition, is an ideal partner for young start-ups and entrepreneurs. For the upcoming tenth anniversary edition the competition will receive an update. Building upon a successful base of the past nine editions and equipped with contemporary networking events and more know-how transferring seminars, >venture> will fit even better into the Swiss start-up ecosystem.

  7. Implementing a bar-coded bedside medication administration system.

    PubMed

    Yates, Cindy

    2007-01-01

    Hospitals across the nation are struggling with implementing electronic medication administration and reporting (eMAR) systems as part of patient safety programs. St Luke's Hospital in Chesterfield, Mo, initiated their eMAR initiative in June 2003, initiating program start-up in September 2004. This case study documents how the project was approached, its overall success, and what was learned along the way. Also included is a recent update highlighting the expansion of St Luke's patient safety initiative, adapting eMAR to two specialty units: dialysis and laboratory processes.

  8. 20 CFR 632.254 - Program startup.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program startup. 632.254 Section 632.254 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.254 Program startup...

  9. 20 CFR 632.254 - Program startup.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program startup. 632.254 Section 632.254 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.254 Program startup...

  10. 20 CFR 632.254 - Program startup.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Program startup. 632.254 Section 632.254 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.254 Program startup...

  11. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What criteria for pre-startup review must be in... pre-startup review must be in my SEMS program? Your SEMS program must require that the commissioning process include a pre-startup safety and environmental review for new and significantly modified...

  12. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  13. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  14. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  15. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  16. Start-Up Training in Mississippi: Program Development Guide.

    ERIC Educational Resources Information Center

    Brooks, Kent; And Others

    Due to recent industrial growth in Mississippi and the shortage of trained manpower in numerous occupations, start-up training programs have originated to provide a pretrained work force for new or expanding industry in the State. Each start-up training program is a joint effort between a new or expanding industry and a public educational…

  17. 45 CFR 309.150 - What start-up costs are allowable for Tribal IV-D programs carried out under § 309.65(b) of this...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false What start-up costs are allowable for Tribal IV-D... ENFORCEMENT (IV-D) PROGRAM Tribal IV-D Program Funding § 309.150 What start-up costs are allowable for Tribal IV-D programs carried out under § 309.65(b) of this part? Federal funds are available for costs of...

  18. The Phenomenon of Business Start-Ups.

    ERIC Educational Resources Information Center

    Melis, Africa

    1990-01-01

    A study of four European countries (France, United Kingdom, Italy, and Spain) was conducted to gather data on the business start-up process and its impact on the generation of jobs, small business start-up support programs, training and counseling programs, and characteristics of successful business starters. (The original aim of the study was to…

  19. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction. 63.1111 Section 63.1111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and...

  20. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  1. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  2. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  3. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  4. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  5. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What criteria for pre-startup review must be in... SHELF Safety and Environmental Management Systems (SEMS) § 250.1917 What criteria for pre-startup review...-startup safety and environmental review for new and significantly modified facilities that are subject to...

  6. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What criteria for pre-startup review must be in... SHELF Safety and Environmental Management Systems (SEMS) § 250.1917 What criteria for pre-startup review...-startup safety and environmental review for new and significantly modified facilities that are subject to...

  7. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What criteria for pre-startup review must be in... SHELF Safety and Environmental Management Systems (SEMS) § 250.1917 What criteria for pre-startup review...-startup safety and environmental review for new and significantly modified facilities that are subject to...

  8. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  9. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  10. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  11. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  12. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  13. 40 CFR 63.1367 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) of subpart A of this part. (3) Startup, shutdown, and malfunction plan. The owner or operator of an affected source shall develop a written startup, shutdown, and malfunction plan as specified in § 63.6(e)(3... during periods of startup, shutdown, and malfunction and a program for corrective action for a...

  14. Physicochemical characteristics and microbial community evolution of biofilms during the start-up period in a moving bed biofilm reactor.

    PubMed

    Zhu, Yan; Zhang, Yan; Ren, Hong-Qiang; Geng, Jin-Ju; Xu, Ke; Huang, Hui; Ding, Li-Li

    2015-03-01

    This study aimed to investigate biofilm properties evolution coupled with different ages during the start-up period in a moving bed biofilm reactor system. Physicochemical characteristics including adhesion force, extracellular polymeric substances (EPS), morphology as well as volatile solid and microbial community were studied. Results showed that the formation and development of biofilms exhibited four stages, including (I) initial attachment and young biofilm formation, (II) biofilms accumulation, (III) biofilm sloughing and updating, and (IV) biofilm maturation. During the whole start-up period, adhesion force was positively and significantly correlated with the contents of EPS, especially the content of polysaccharide. In addition, increased adhesion force and EPS were beneficial for biofilm retention. Gram-negative bacteria mainly including Sphaerotilus, Zoogloea and Haliscomenobacter were predominant in the initial stage. Actinobacteria was beneficial to resist sloughing. Furthermore, filamentous bacteria were dominant in maturation biofilm. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The... stationary sources when the modification is significant enough to require a change in the process safety... substances to a process: (1) Construction and equipment is in accordance with design specifications; (2...

  16. 77 FR 15004 - Updating of Employer Identification Numbers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... the IRS, including whether the information will have practical utility; The accuracy of the estimated... techniques or other forms of information technology; and Estimates of capital or start-up costs and costs of... respondents are persons that have an EIN. Estimated total annual reporting burden: 403,177 hours. Estimated...

  17. Bio-Manufacturing to market pilot project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dressen, Tiffaney

    The Bio-Manufacturing to Market pilot project was a part of the AMJIAC, the Advanced Manufacturing Jobs and Innovation Accelerator Challenge grant. This internship program set out to further define and enhance the talent pipeline from the University and local Community Colleges to startup culture in East Bay Area, provide undergraduate STEM students with opportunities outside academia, and provide startup companies with much needed talent. Over the 4 year period of performance, the Bio-Manufacturing to Market internship program sponsored 75 undergraduate STEM students who were able to spend anywhere from one to six semesters working with local Bay Area startup companiesmore » and DOE sponsored facilities/programs in the biotech, bio-manufacturing, and biomedical device fields.« less

  18. Case Study of a Discontinued Start-Up Engineering Program: Critical Challenges and Lessons Learned

    ERIC Educational Resources Information Center

    Friess, Wilhelm A.

    2017-01-01

    The explanatory case study presented here analyzes the factors that have contributed to the failure of a start-up engineering program launched at an off-campus site, and aimed at imparting the first two years of the BSc Mechanical, Electrical, Computer and Civil Engineering utilizing an integrated curriculum. Findings indicate the root cause for…

  19. N.S. SAVANNAH, DRAFT OF FINAL SAFEGUARDS REPORT TEST, START-UP AND TRIALS, NEW YORK SHIPBUILDING CORPORATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1960-04-01

    The N. S. Savannah program for testing, start-up, and initial operation of all reactor and propulsion components and systems is discussed. Definitions of test phases are given and various stages of the test program are outlined. A list of tests for the various reactor, propulsion, and other system components is included. (C.J.G.)

  20. Function of university reactors in operator licensing training for nuclear utilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wicks, F.

    1985-11-01

    The director of the Division of the US Nuclear Regulatory Commission in generic letter 84-10, dated April 26, 1984, spoke the requirement that applicants for senior reactor operator licenses for power reactors shall have performed then reactor startups. Simulator startups were not acknowledged. Startups performed on a university reactor are acceptable. The content and results of a five-day program combining instruction and experiments with the Rensselaer reactor are summarized.

  1. Model citizens. Outsourcing helps start-up Medicare HMO.

    PubMed

    Slavic, B; Adami, S

    1999-04-01

    Health Plans of Pennsylvania (HPP), the managed care arm of Crozer-Keystone Health System, in Media, Pa. Selecting the information systems and building the infrastructure to support the start-up of a new Medicare HMO product. HPP chose to outsource the information systems needed to integrate all the components of managed care administration into a cost-effective and cohesive program. Because of its aggressive programming and start-up of the MedCarePlus product offering, HPP became the first plan in the country to submit Medicare claims data electronically for encounter reporting to the Health Care Financing Administration (HCFA). "Through an integrated team approach, an organization truly can benefit from the economies of scale gained through outsourcing."

  2. The ASA Regional Chapters program

    NASA Astrophysics Data System (ADS)

    McLaughlin, Elizabeth; Arvelo, Juan

    2005-04-01

    Are you involved in a Regional Chapter? The Regional Chapters Program certainly embraces the intent of our Society. ``The ASA was founded... to increase and diffuse the knowledge of acoustics and promote its practical applications. Any person... interested in acoustics is eligible for membership.'' The history and the activities of each Chapter are unique. There are currently twenty active chapters uniquely positioned to promote acoustics through outreach and involvement with the public. There have been several new developments in the Regional Chapters Program, the most exciting being the incorporation of Student Chapters! Our first, the Nebraska Student Chapter, was approved at the 75th Meeting of the ASA in NYC. Several more are on their way! Existing Chapters are revitalizing! The Washington DC Chapter has recently found new enthusiasm, re-establishing a robust program. A new student scholarship has been organized thanks to the generosity of Larry and Julia Royster. Another recent enhancement is the expansion of the Regional Chapters Website. There one can find useful materials including an updated Chapter Start-up Kit. Involvement in a chapter is a great way to give back to the ASA, to learn, promote acoustics, to socialize, and to involve new persons in our exciting field!

  3. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  4. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  5. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  6. 40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  7. 76 FR 5192 - BOEMRE Information Collection Activity: 1010-0170-Coastal Impact Assistance Program (CIAP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... disclose this information, you should comment and provide your total capital and startup cost components or... use to estimate major cost factors, including system and technology acquisition, expected useful life... startup costs include, among other items, computers and software you purchase to prepare for collecting...

  8. Entrepreneurship Education in UK HEIs: Origins, Development and Trends.

    ERIC Educational Resources Information Center

    Watkins, David; Stone, Gareth

    1999-01-01

    Outreach to small businesses in the United Kingdom since the 1970s has resulted in 45% of universities now offering courses on business startup. The government is investing 25 million pounds to develop centers of excellence in universities with leading-edge science and technology programs, for the startup of high-tech firms. (SK)

  9. Startup Hopefuls Test Their Ideas with Educators

    ERIC Educational Resources Information Center

    Tomassini, Jason

    2012-01-01

    "Educator day" is one of the most important and nerve-racking for the people taking part in Imagine K12, the biggest incubator program in the United States specifically for education technology startups. Many entrepreneurs in K-12 believe technology can solve education's problems, but don't work to understand those problems before prescribing…

  10. Silicon Startup Schools: Technocracy, Algorithmic Imaginaries and Venture Philanthropy in Corporate Education Reform

    ERIC Educational Resources Information Center

    Williamson, Ben

    2018-01-01

    Technology companies are investing billions of dollars in educational technology, but also creating their own alternative schools. This article traces the emergence of four prototypical 'silicon startup schools' as exemplars of a technocratic mode of corporatized education reform: IBM's P-TECH, part of its Smarter Cities program; AltSchool, a…

  11. Start-Up and Ongoing Practice Expenses of Behavioral Health and Primary Care Integration Interventions in the Advancing Care Together (ACT) Program.

    PubMed

    Wallace, Neal T; Cohen, Deborah J; Gunn, Rose; Beck, Arne; Melek, Steve; Bechtold, Donald; Green, Larry A

    2015-01-01

    Provide credible estimates of the start-up and ongoing effort and incremental practice expenses for the Advancing Care Together (ACT) behavioral health and primary care integration interventions. Expenditure data were collected from 10 practice intervention sites using an instrument with a standardized general format that could accommodate the unique elements of each intervention. Average start-up effort expenses were $44,076 and monthly ongoing effort expenses per patient were $40.39. Incremental expenses averaged $20,788 for start-up and $4.58 per patient for monthly ongoing activities. Variations in expenditures across practices reflect the differences in intervention specifics and organizational settings. Differences in effort to incremental expenditures reflect the extensive use of existing resources in implementing the interventions. ACT program incremental expenses suggest that widespread adoption would likely have a relatively modest effect on overall health systems expenditures. Practice effort expenses are not trivial and may pose barriers to adoption. Payers and purchasers interested in attaining widespread adoption of integrated care must consider external support to practices that accounts for both incremental and effort expense levels. Existing knowledge transfer mechanisms should be employed to minimize developmental start-up expenses and payment reform focused toward value-based, Triple Aim-oriented reimbursement and purchasing mechanisms are likely needed. © Copyright 2015 by the American Board of Family Medicine.

  12. HLW system plan - revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-14

    The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources frommore » within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.« less

  13. First LNG from North field overcomes feed, start-up problems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Redha, A.; Rahman, A.; Al-Thani, N.H.

    Qatar Gas LNG is the first LNG project in the gas-development program of the world`s largest gas reservoir, North field. The LNG plant was completed within the budget and schedule. The paper discusses the LNG plant design, LNG storage and loading, alternative mercaptan removal, layout modification, information and control systems, training, data management systems, start-up, and performance testing.

  14. Reactor engineering support of operations at the Davis-Besse nuclear power station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelley, D.B.

    1995-12-31

    Reactor engineering functions differ greatly from unit to unit; however, direct support of the reactor operators during reactor startups and operational transients is common to all units. This paper summarizes the support the reactor engineers provide the reactor operators during reactor startups and power changes through the use of automated computer programs at the Davis-Besse nuclear power station.

  15. International Education Programs: Access to the World and Its Languages

    ERIC Educational Resources Information Center

    Office of Postsecondary Education, US Department of Education, 2012

    2012-01-01

    The International Education Programs Service (IEPS) administers 14 education programs. These programs are complementary in nature and designed to benefit a variety of audiences through training programs, research, start-up or enhancement projects, and fellowships. This paper provides brief descriptions of these programs.

  16. From a Student of Startup Business to a Startup Employee or Entrepreneur: Study on Career Narratives of Students in Entrepreneurial Programs in a University

    ERIC Educational Resources Information Center

    Saukkonen, Juha

    2017-01-01

    The purpose of this research is to gain an understanding of the incidents, relationships and processes that support entrepreneurial students to become employees and entrepreneurs. Through a qualitative approach based on career history and projections written by the respondents, this study aims to shed light on the process of becoming an…

  17. The Status of Child Nutrition Programs in Colorado.

    ERIC Educational Resources Information Center

    McMillan, Daniel C.; Vigil, Herminia J.

    This report describes federal and state child nutrition programs in effect in Colorado elementary and secondary schools. Programs discussed include the National School Lunch Program (NSLP), the School Breakfast Program (SBP), school breakfast start-up grants, the Special Milk Program, the Summer Food Service Program, and the Nutrition Education…

  18. 7 CFR 225.9 - Program assistance to sponsors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.9 Program... of the sponsor's approved administrative budget. The amount of the start-up payment shall be deducted...

  19. 7 CFR 225.9 - Program assistance to sponsors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.9 Program... of the sponsor's approved administrative budget. The amount of the start-up payment shall be deducted...

  20. 7 CFR 225.9 - Program assistance to sponsors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.9 Program... of the sponsor's approved administrative budget. The amount of the start-up payment shall be deducted...

  1. 7 CFR 225.9 - Program assistance to sponsors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SUMMER FOOD SERVICE PROGRAM State Agency Provisions § 225.9 Program... of the sponsor's approved administrative budget. The amount of the start-up payment shall be deducted...

  2. DISP: Optimizations towards Scalable MPI Startup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fu, Huansong; Pophale, Swaroop S; Gorentla Venkata, Manjunath

    2016-01-01

    Despite the popularity of MPI for high performance computing, the startup of MPI programs faces a scalability challenge as both the execution time and memory consumption increase drastically at scale. We have examined this problem using the collective modules of Cheetah and Tuned in Open MPI as representative implementations. Previous improvements for collectives have focused on algorithmic advances and hardware off-load. In this paper, we examine the startup cost of the collective module within a communicator and explore various techniques to improve its efficiency and scalability. Accordingly, we have developed a new scalable startup scheme with three internal techniques, namelymore » Delayed Initialization, Module Sharing and Prediction-based Topology Setup (DISP). Our DISP scheme greatly benefits the collective initialization of the Cheetah module. At the same time, it helps boost the performance of non-collective initialization in the Tuned module. We evaluate the performance of our implementation on Titan supercomputer at ORNL with up to 4096 processes. The results show that our delayed initialization can speed up the startup of Tuned and Cheetah by an average of 32.0% and 29.2%, respectively, our module sharing can reduce the memory consumption of Tuned and Cheetah by up to 24.1% and 83.5%, respectively, and our prediction-based topology setup can speed up the startup of Cheetah by up to 80%.« less

  3. 40 CFR 68.175 - Prevention program/Program 3.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.175 Prevention program/Program... the most recent change that triggered management of change procedures and the date of the most recent review or revision of management of change procedures. (j) The date of the most recent pre-startup review...

  4. Research for the Fluid Field of the Centrifugal Compressor Impeller in Accelerating Startup

    NASA Astrophysics Data System (ADS)

    Li, Xiaozhu; Chen, Gang; Zhu, Changyun; Qin, Guoliang

    2013-03-01

    In order to study the flow field in the impeller in the accelerating start-up process of centrifugal compressor, the 3-D and 1-D transient accelerated flow governing equations along streamline in the impeller of the centrifugal compressor are derived in detail, the assumption of pressure gradient distribution is presented, and the solving method for 1-D transient accelerating flow field is given based on the assumption. The solving method is achieved by programming and the computing result is obtained. It is obtained by comparison that the computing method is met with the test result. So the feasibility and effectiveness for solving accelerating start-up problem of centrifugal compressor by the solving method in this paper is proven.

  5. The startup of the Dodewaard natural circulation boiling water reactor -- Experiences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nissen, W.H.M.; Van Der Voet, J.; Karuza, J.

    1994-07-01

    Because of its similarity to the simplified boiling water reactor (SBWR), the Dodewaard natural circulation boiling water reactor (BWR) is of special interest to further development of the SBWR design. It has become especially important to gain more insight into the Dodewaard BWR behavior during startup, paying special attention to its stability. Therefore, special instrumentation was used by means of which a series of measurements were taken during the two startups in February and June 1992. The results obtained from these measurements are used to deepen insight into the recirculation flow and the stability of the reactor during startup undermore » conditions with a normal pressure/power trajectory. They have already shown a very early recirculation flow onset during low-power operation and no indication of reactor instability. Furthermore, they will be used as a basis for the research program investigating the reactor behavior under different pressure/power conditions, which is scheduled for next year.« less

  6. 7 CFR 249.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) General § 249.2 Definitions... and start-up; the provision of nutrition education; SFMNP coupon issuance; participant education...

  7. 7 CFR 249.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) General § 249.2 Definitions... and start-up; the provision of nutrition education; SFMNP coupon issuance; participant education...

  8. 7 CFR 249.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) General § 249.2 Definitions... and start-up; the provision of nutrition education; SFMNP coupon issuance; participant education...

  9. 7 CFR 249.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) General § 249.2 Definitions... and start-up; the provision of nutrition education; SFMNP coupon issuance; participant education...

  10. 7 CFR 249.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) General § 249.2 Definitions... and start-up; the provision of nutrition education; SFMNP coupon issuance; participant education...

  11. 7 CFR 1980.441 - Borrower equity requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management history vs. start-up businesses; personal/corporate guarantees offered; contractual relationships... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL Business and Industrial Loan Program § 1980.441 Borrower...

  12. Landing Gear/Soil Interaction Development of Criteria for Aircraft Operation on Soil During Turning and Multipass Operations

    DTIC Science & Technology

    1975-10-01

    AFFDL-TR-75-78 LANDING GEAR/ SOIL INTERACTION DEVELOPMENT OF CRITERIA FOR AIRCRAFT "OPERATION ON SOIL DURING TURNING #"q AND MULTIPASS OPERATIONS cc...braking. Limited start-up force data were examined to determine a preliminary estimate of start-up drag ratios. A soft tire/ soil computer program was...distance, landing rollout, turning perfor nance, and number of allowable passes for a particular vehicle and select soil . .. 4 UNCLASSIFIED -i SECURITY

  13. Modeling of transient heat pipe operation

    NASA Technical Reports Server (NTRS)

    Colwell, Gene T.

    1989-01-01

    Mathematical models and an associated computer program for heat pipe startup from the frozen state have been developed. Finite element formulations of the governing equations are written for each heat pipe region for each operating condition during startup from the frozen state. The various models were checked against analytical and experimental data available in the literature for three specific types of operation. Computations using the methods developed were made for a space shuttle reentry mission where a heat pipe cooled leading edge was used on the wing.

  14. Tampa Electric Company Polk Power Station IGCC project: Project status

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC andmore » Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.« less

  15. NASA Early Career Fellowship Program

    NASA Astrophysics Data System (ADS)

    Smith, H. D.

    2012-12-01

    The Early Career Fellowship program was established in 2005 to facilitate the integration of outstanding early career planetary science researchers into established research funding programs by providing tools and experience useful to maintain a successful research program. Executing a successful research program requires a few key elements such as: successful proposal writing; adequate (paid) research time; management of a laboratory; collaboration and networking; frequent and high-quality publications; and adequate start-up equipment funds. These elements may be particularly critical for early career researchers searching for a tenure- track or equivalent position. The Early Career Fellowship program recognizes the importance of these skills and provides extra funding and resources to begin a successful research program. For consideration into The Early Career Fellowship program, the candidate needs to be the P. I. or Science P.I. of a funded research proposal from one of the participating R&A program areas, be within 7 years of earning a PhD, hold a non-tenure track position, and indicate the early career candidacy when submitting the research proposal. If the research proposal is funded and the discipline scientist nominates the candidate as an early career fellow, the candidate is then considered a Fellow and eligible to propose for Step 2. Upon obtaining a tenure-track equivalent position the Fellow submits a Step 2 proposal for up to one hundred thousand dollars in start-up funds. Start-up funds may be used for salary; undergraduate and/or graduate research assistants; supplies and instrument upgrades; travel to conferences, meetings, and advisory groups; time and travel for learning new skills; publication page charges; books and journal subscriptions; computer time and/or specialized software; and other justified research-specific needs. The early career fellowship program provides resources that a more established scientist would have acquired allowing the Fellow to be a better job applicant. NASA opportunities from the undergraduate to postdoctoral level are also discussed.

  16. Santa Fe School Precision Teaching Program, Evaluation Report 1974-75.

    ERIC Educational Resources Information Center

    Spencer, Mary L.; Henderson, Joan C.

    The Santa Fe Precision Teaching for Effective Learning, (PTEL) an ESEA Title III program, was selected as a remedial instructional approach to the performance and motivational problems of Santa Fe students. It proposed the following six major program objectives: (1) planning and implementation of start-up activities; (2) staff training in the…

  17. 40 CFR 68.175 - Prevention program/Program 3.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operating procedures. (g) The date of the most recent review or revision of training programs; (1) The type of training provided—classroom, classroom plus on the job, on the job; and (2) The type of competency... review or revision of management of change procedures. (j) The date of the most recent pre-startup review...

  18. 40 CFR 68.175 - Prevention program/Program 3.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operating procedures. (g) The date of the most recent review or revision of training programs; (1) The type of training provided—classroom, classroom plus on the job, on the job; and (2) The type of competency... review or revision of management of change procedures. (j) The date of the most recent pre-startup review...

  19. 40 CFR 68.175 - Prevention program/Program 3.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operating procedures. (g) The date of the most recent review or revision of training programs; (1) The type of training provided—classroom, classroom plus on the job, on the job; and (2) The type of competency... review or revision of management of change procedures. (j) The date of the most recent pre-startup review...

  20. 40 CFR 68.175 - Prevention program/Program 3.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operating procedures. (g) The date of the most recent review or revision of training programs; (1) The type of training provided—classroom, classroom plus on the job, on the job; and (2) The type of competency... review or revision of management of change procedures. (j) The date of the most recent pre-startup review...

  1. Technical and design update in the AUBE French low-level radioactive waste disposal facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marque, Y.

    1989-01-01

    Long-term industrial management of radioactive waste in France is carried out by the Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA). ANDRA is in charge of design, siting, construction, and operation of disposal centers. The solution selected in France for the disposal of low- and medium-level, short-lived radioactive waste is near-surface disposal in the earth using the principle of multiple barriers, in accordance with national safety rules and regulations, and based on operating experience from the Centre de Stockage de la Manche. Since the center's start-up in 1969, 400,000 m{sup 3} of waste have been disposed of. The Frenchmore » national program for waste management is proceeding with the construction of a second near-surface disposal, which is expected to be operational in 1991. It is located in the department of AUBE (from which its name derives), 100 miles southeast of Paris. The paper describes the criteria for siting and design of the AUBE disposal facility, design of the AUBE facility disposal module, and comparison with North Carolina and Pennsylvania disposal facility designs.« less

  2. Non-Solenoidal Startup Research Directions on the Pegasus Toroidal Experiment

    NASA Astrophysics Data System (ADS)

    Fonck, R. J.; Bongard, M. W.; Lewicki, B. T.; Reusch, J. A.; Winz, G. R.

    2017-10-01

    The Pegasus research program has been focused on developing a physical understanding and predictive models for non-solenoidal tokamak plasma startup using Local Helicity Injection (LHI). LHI employs strong localized electron currents injected along magnetic field lines in the plasma edge that relax through magnetic turbulence to form a tokamak-like plasma. Pending approval, the Pegasus program will address a broader, more comprehensive examination of non-solenoidal tokamak startup techniques. New capabilities may include: increasing the toroidal field to 0.6 T to support critical scaling tests to near-NSTX-U field levels; deploying internal plasma diagnostics; installing a coaxial helicity injection (CHI) capability in the upper divertor region; and deploying a modest (200-400 kW) electron cyclotron RF capability. These efforts will address scaling of relevant physics to higher BT, separate and comparative studies of helicity injection techniques, efficiency of handoff to consequent current sustainment techniques, and the use of ECH to synergistically improve the target plasma for consequent bootstrap and neutral beam current drive sustainment. This has an ultimate goal of validating techniques to produce a 1 MA target plasma in NSTX-U and beyond. Work supported by US DOE Grant DE-FG02-96ER54375.

  3. Training Entrepreneurship at Universities: A Swedish Case.

    ERIC Educational Resources Information Center

    Klofsten, Magnus

    2000-01-01

    The Entrepreneurship and New Business Development Program trains Swedish individuals in the startup of technology- or knowledge-based enterprises. Built on the characteristics of entrepreneurial behavior, the program features a holistic outlook, a network of established entrepreneurs, mentoring, a mix of theory and practice, and focus on the…

  4. Experts in the Classroom: Fellows Program Connects Teacher Learning to Student Outcomes

    ERIC Educational Resources Information Center

    Pett, Kate; Strahan, David; Gates, Carlye

    2014-01-01

    This article provides snapshots of teacher leadership in action as one result of the Asheville (N.C.) City Schools Foundation Innovation Fellows program, an approach to providing high quality professional learning for the district's best teachers. With start-up funding from the Z. Smith Reynolds Foundation, this program was created to retain great…

  5. Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, P.A.

    1996-11-01

    The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.

  6. A Coordinated Initialization Process for the Distributed Space Exploration Simulation

    NASA Technical Reports Server (NTRS)

    Crues, Edwin Z.; Phillips, Robert G.; Dexter, Dan; Hasan, David

    2007-01-01

    A viewgraph presentation on the federate initialization process for the Distributed Space Exploration Simulation (DSES) is described. The topics include: 1) Background: DSES; 2) Simulation requirements; 3) Nine Step Initialization; 4) Step 1: Create the Federation; 5) Step 2: Publish and Subscribe; 6) Step 3: Create Object Instances; 7) Step 4: Confirm All Federates Have Joined; 8) Step 5: Achieve initialize Synchronization Point; 9) Step 6: Update Object Instances With Initial Data; 10) Step 7: Wait for Object Reflections; 11) Step 8: Set Up Time Management; 12) Step 9: Achieve startup Synchronization Point; and 13) Conclusions

  7. 78 FR 64292 - Community Development Financial Institutions Fund Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    .... ADDRESSES: Direct all comments to Lisa Jones, CDFI Bond Guarantee Program Manager, at the Community... should be directed to Lisa Jones, CDFI Bond Guarantee Program Manager, at the Community Development... on respondents, including through the use of technology; and (e) estimates of capital or start-up...

  8. Designing Effective Programmes for Encouraging the Business Start-up Process: Lessons from UK Experience.

    ERIC Educational Resources Information Center

    Gibb, Allan A.

    1987-01-01

    Outlines programs in the United Kingdom (UK) designed to encourage the starting of small businesses. Successful programs help entrepreneurs obtain financial support, get business training, and develop a business plan. Recommends emphasis on personal competency and motivation training as well as shorter courses. (CH)

  9. Programs and Practices in Adult Counseling.

    ERIC Educational Resources Information Center

    Walz, Garry R.; Benjamin, Libby

    This monograph is based on the authors' visits and communications with directors and staff, and presents an analysis of adult counseling programs operating in many sites around the nation. General characteristics of adult counseling centers are assessed in terms of start-up and funding, public relations and referrals, location, hours of operation,…

  10. Design of automatic startup and shutdown logic for a Brayton-cycle 2- to 15-kilowatt engine

    NASA Technical Reports Server (NTRS)

    Vrancik, J. E.; Bainbridge, R. C.

    1975-01-01

    The NASA Lewis Research Center is conducting a closed-Brayton-cycle power conversion system technology program in which a complete power system (engine) has been designed and demonstrated. This report discusses the design of automatic startup and shutdown logic circuits as a modification to the control system presently used in this demonstration engine. This modification was primarily intended to make starting the engine as simple and safe as possible and to allow the engine to be run unattended. In the modified configuration the engine is started by turning the control console power on and pushing the start button after preheating the gas loop. No other operator action is required to effect a complete startup. Shutdown, if one is required, is also effected by a simple stop button. The automatic startup and shutdown of the engine have been successfully and purposefully demonstrated more than 50 times at the Lewis Research Center during 10,000 hours of unattended operation. The net effect of this modification is an engine that can be safely started and stopped by relatively untrained personnel. The approach lends itself directly to remote unattended operation.

  11. A race against time: can CO-OPs and provider start-ups survive in the health insurance marketplaces?

    PubMed

    Eggbeer, Bill

    2015-12-01

    > The Affordable Care Act's state and federal health insurance marketplaces, designed to provide affordable insurance coverage to individuals and small groups, are proving hostile territory to new market entrants. Efforts to inject competition into the marketplaces are being challenged by the wide-scale withdrawal o consumer-operated and oriented plans (CO-OPs). Meanwhile, premiums appear likely to increase for consumers as plans seek to balance medical losses. Flaws in the "Three R's" (reinsurance, risk corridors, and risk-adjustment) program are viewed as a threat to the survival of CO-OPs and start-ups.

  12. 75 FR 4585 - Proposed Extension of the Approval of Information Collection Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... students. Type of Review: Extension. Agency: Office of Workers' Compensation Programs. Title: Certification... Burden Hours: 50. Total Burden Cost (capital/startup): $0. Total Burden Cost (operating/maintenance): $0...

  13. Zero to Sixty Plus in 108 Days: Launching a Central Elearning Unit and Its First Faculty Development Program

    ERIC Educational Resources Information Center

    Orozco, Monica; Fowlkes, James; Jerzak, Page; Musgrove, Ann

    2012-01-01

    The Center for eLearning was established at Florida Atlantic University (FAU) as a result of a university-wide task force. A brief overview of the center's start-up activity is followed by a thorough report of the first faculty development program created and implemented. The structure of the program is described, and data are provided showing…

  14. 40 CFR 63.401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., ventilation, or air conditioning system. Initial startup means the initiation of recirculation water flow... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for...

  15. Loop Heat Pipe Startup Behaviors

    NASA Technical Reports Server (NTRS)

    Ku, Jentung

    2016-01-01

    A loop heat pipe must start successfully before it can commence its service. The startup transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe startup behaviors. Topics include the four startup scenarios, the initial fluid distribution between the evaporator and reservoir that determines the startup scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power startup, and methods to enhance the startup success. Also addressed are the pressure spike and pressure surge during the startup transient, and repeated cycles of loop startup and shutdown under certain conditions.

  16. On a difficulty in eigenfunction expansion solutions for the start-up of fluid flow

    NASA Astrophysics Data System (ADS)

    Christov, Ivan C.

    2015-11-01

    Most mathematics and engineering textbooks describe the process of ``subtracting off'' the steady state of a linear parabolic partial differential equation as a technique for obtaining a boundary-value problem with homogeneous boundary conditions that can be solved by separation of variables (i.e., eigenfunction expansions). While this method produces the correct solution for the start-up of the flow of, e.g., a Newtonian fluid between parallel plates, it can lead to erroneous solutions to the corresponding problem for a class of non-Newtonian fluids. We show that the reason for this is the non-rigorous enforcement of the start-up condition in the textbook approach, which leads to a violation of the principle of causality. Nevertheless, these boundary-value problems can be solved correctly using eigenfunction expansions, and we present the formulation that makes this possible (in essence, an application of Duhamel's principle). The solutions obtained by this new approach are shown to agree identically with those obtained by using the Laplace transform in time only, a technique that enforces the proper start-up condition implicitly (hence, the same error cannot be committed). Supported, in part, by NSF Grant DMS-1104047 and the U.S. DOE (Contract No. DE-AC52-06NA25396) through the LANL/LDRD Program.

  17. Thermal conductivity of nanowires

    NASA Astrophysics Data System (ADS)

    Zhang, Zhongwei; Chen, Jie

    2018-03-01

    Not Available Project supported by the National Key Research and Development Program of China (Grant No. 2017YFB0406000), the National Natural Science Foundation of China (Grant Nos. 51506153 and 11334007), the Science and Technology Commission of Shanghai Municipality, China (Grant No. 17ZR1448000), and the National Youth 1000 Talents Program in China and the Startup Grant at Tongji University, China.

  18. Designing Day Care: A Resource Manual for Development of Child Care Services.

    ERIC Educational Resources Information Center

    Jones, Jacquelyn O.

    Compiled to promote the development of high quality, affordable, and accessible day care programs in West Tennessee, this manual helps prospective child caregivers decide which kind of day care to operate and describes start-up steps and program operation. Section 1 focuses on five basic questions of potential caregivers: (1) Which type of child…

  19. Starting Labor-Management Quality of Work Life Programs.

    ERIC Educational Resources Information Center

    Brower, Michael

    This report summarizes the experiences of the Massachusetts Quality of Working Life Center in assisting the attempted and actual start-up of a number of quality of work life (QWL) programs in 1976 and 1977 and in providing ongoing assistance. Lessons learned by the three sites the center launched, other sites, as well as those sites that chose not…

  20. Early Achievements in Service Integration: What We Can Learn from No Wrong Door Startups.

    ERIC Educational Resources Information Center

    Washington State Dept. of Social and Health Services, Olympia. Office of Research and Data Analysis.

    The Washington State Department of Social and Health Services (DSHS) was created as an umbrella agency, to bring together state human service programs, so that people could get comprehensive assistance with many, often interrelated needs. Efforts were made to co-locate various service program offices to make access to various services easier.…

  1. Teaching for Tomorrow: "Quick Start-Up" Vocational Training Programs.

    ERIC Educational Resources Information Center

    Langen, Herbert J.; Thomas, Violet S.

    This report contains a description of the economic outlook of Arizona and the nation as a whole, information on nationwide skill centers and their efforts to meet industry's needs, and recommendations for a program that would be effective in answering future labor needs. Section 1 includes the economic outlook for Arizona and the nation; a report…

  2. ROBUS-2: A Fault-Tolerant Broadcast Communication System

    NASA Technical Reports Server (NTRS)

    Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Miner, Paul S.

    2005-01-01

    The Reliable Optical Bus (ROBUS) is the core communication system of the Scalable Processor-Independent Design for Enhanced Reliability (SPIDER), a general-purpose fault-tolerant integrated modular architecture currently under development at NASA Langley Research Center. The ROBUS is a time-division multiple access (TDMA) broadcast communication system with medium access control by means of time-indexed communication schedule. ROBUS-2 is a developmental version of the ROBUS providing guaranteed fault-tolerant services to the attached processing elements (PEs), in the presence of a bounded number of faults. These services include message broadcast (Byzantine Agreement), dynamic communication schedule update, clock synchronization, and distributed diagnosis (group membership). The ROBUS also features fault-tolerant startup and restart capabilities. ROBUS-2 is tolerant to internal as well as PE faults, and incorporates a dynamic self-reconfiguration capability driven by the internal diagnostic system. This version of the ROBUS is intended for laboratory experimentation and demonstrations of the capability to reintegrate failed nodes, dynamically update the communication schedule, and tolerate and recover from correlated transient faults.

  3. 77 FR 24479 - Information Collection; Submission for OMB Review, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Member Application Form which is used by individuals to apply to serve in an AmeriCorps program. Type of... Total Burden Hours: 281,250. Total Burden Cost (capital/startup): None. Total Burden Cost (operating...

  4. Materiel Acquisition Management of U.S. Army Attack Helicopters

    DTIC Science & Technology

    1989-06-02

    used to evaluate the existing helicopter program periodically in order to determine utility in reference to all evaluation criteria. Defintion of... mixed integer linear programming model, the Phoenix model has demonstrated the potential to assist in the analysis of strategic and operational issues in...Fleet Max i of Aircraft per Fleet Programmed Buys .. -- Technology Unit Production mix Retirement Start-up ROTIE Flying Hour Aviation Overheadl I Aviation

  5. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  6. Magnetron magnetic priming for rapid startup and noise reduction

    NASA Astrophysics Data System (ADS)

    Neculaes, Vasile Bogdan

    The magnetron is a vacuum electronics crossed-field device: perpendicular electric and magnetic fields determine the electron dynamics. Compactness, efficiency and reliability make magnetrons suitable for a wide range of military and civilian applications: radar, industrial heating, plasma sources, and medical accelerators. The most ubiquitous use of magnetrons is as the microwave power source in microwave ovens, operating at 2.45 GHz and delivering about 800--1000 W. University of Michigan and several other research programs are actively pursuing the development of GW range relativistic magnetrons. This dissertation presents experimental and computational results concerning innovative techniques to improve magnetron noise, startup and mode stability. The DC-operated oven magnetron studies performed at University of Michigan opened new directions by utilizing azimuthally varying magnetic fields (magnetic priming). Magnetic priming for rapid startup in an N-cavity magnetron operating in the pi-mode is based on implementation of an axial magnetic field with N/2 azimuthal periods, to prebunch the electrons in the desired number of spokes (N/2). Experiments with magnetic priming on DC oven magnetrons using perturbing magnets added on the upper existing magnet of the magnetron showed rapid startup (pi-mode oscillation observed at low currents) and up to 35 dB noise reduction (close to the carrier and in sidebands). A complex 3-dimensional (3D) ICEPIC computational model recovered the oven magnetron magnetic priming experimental results: rapid electron prebunching due to presence of perturbing magnets, fast startup and tendency towards a lower noise state. Simulations in 6-cavity relativistic magnetrons show that ideal magnetic priming causes fast startup, rapid mode growth (with radial electron diffusion) and suppression of mode competition. A highly idealized model (planar, crossed-field, non-resonant, non-relativistic structure) using single particle dynamics showed that magnetic priming causes rapid electron prebunching, specific symmetries in the electron cloud and an orbital parametric instability (radial exponential growth).

  7. Loop Heat Pipe Startup Behaviors

    NASA Technical Reports Server (NTRS)

    Ku, Jentung

    2014-01-01

    A loop heat pipe must start successfully before it can commence its service. The start-up transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe start-up behaviors. Topics include the four start-up scenarios, the initial fluid distribution between the evaporator and reservoir that determines the start-up scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power start-up, and methods to enhance the start-up success. Also addressed are the thermodynamic constraint between the evaporator and reservoir in the loop heat pipe operation, the superheat requirement for nucleate boiling, pressure spike and pressure surge during the start-up transient, and repeated cycles of loop start-up andshutdown under certain conditions.

  8. Start-up control system and vessel for LMFBR

    DOEpatents

    Durrant, Oliver W.; Kakarala, Chandrasekhara R.; Mandel, Sheldon W.

    1987-01-01

    A reflux condensing start-up system includes a steam generator, a start-up vessel connected parallel to the steam generator, a main steam line connecting steam outlets of the steam generator and start-up vessel to a steam turbine, a condenser connected to an outlet of the turbine and a feedwater return line connected between the condenser and inlets of the steam generator and start-up vessel. The start-up vessel has one or more heaters at the bottom thereof for heating feedwater which is supplied over a start-up line to the start-up vessel. Steam is thus generated to pressurize the steam generator before the steam generator is supplied with a heat transfer medium, for example liquid sodium, in the case of a liquid metal fast breeder reactor. The start-up vessel includes upper and lower bulbs with a smaller diameter mid-section to act as water and steam reservoirs. The start-up vessel can thus be used not only in a start-up operation but as a mixing tank, a water storage tank and a level control at low loads for controlling feedwater flow.

  9. Start-up control system and vessel for LMFBR

    DOEpatents

    Durrant, Oliver W.; Kakarala, Chandrasekhara R.; Mandel, Sheldon W.

    1987-01-01

    A reflux condensing start-up system comprises a steam generator, a start-up vessel connected parallel to the steam generator, a main steam line connecting steam outlets of the steam generator and start-up vessel to a steam turbine, a condenser connected to an outlet of the turbine and a feedwater return line connected between the condenser and inlets of the steam generator and start-up vessel. The start-up vessel has one or more heaters at the bottom thereof for heating feedwater which is supplied over a start-up line to the start-up vessel. Steam is thus generated to pressurize the steam generator before the steam generator is supplied with a heat transfer medium, for example liquid sodium, in the case of a liquid metal fast breeder reactor. The start-up vessel includes upper and lower bulbs with a smaller diameter mid-section to act as water and steam reservoirs. The start-up vessel can thus be used not only in a start-up operation but as a mixing tank, a water storage tank and a level control at low loads for controlling feedwater flow.

  10. Federal Investment in Charter Schools: A Proposal for Reauthorizing the Elementary and Secondary Education Act

    ERIC Educational Resources Information Center

    Lazarin, Melissa

    2011-01-01

    The charter school landscape is dramatically different today compared to when the federal government first forayed into the field in 1994. That year it established the Charter School Program as part of the Elementary and Secondary Education Act, or ESEA. The Charter School Program, which is designed to support the startup of new public charter…

  11. Financing and Sustaining Mobility Programs in Rural Areas: A Manual. Final Report.

    ERIC Educational Resources Information Center

    Wallin, Theodore A.; Kidder, Alice

    This manual focuses on the start-up and operation of low-cost transportation in rural areas. A principal focus is the use of volunteers and/or the consolidation of rides through a brokerage program. Chapter One provides an overview of what financial and operating decisions must be made to design a volunteer system. Chapter Two describes easy…

  12. One Environmental Education Center's Industry Initiative: Collaborating to Create More Environmentally and Economically Sustainable Businesses

    ERIC Educational Resources Information Center

    Hollweg, Karen S.

    2009-01-01

    The Centre for Environment Education (CEE) added an Industry Initiative to its portfolio of more traditional environmental education programs in 1993. This article documents the start-up and evolution of that program and the ways that businesses and CEE have worked together for a sustainable future. A specific 18-month project, in which CEE and an…

  13. Thermal Vacuum Testing of a Helium Loop Heat Pipe for Large Area Cryocooling

    NASA Technical Reports Server (NTRS)

    Ku, Jentung; Robinson, Franklin

    2016-01-01

    A loop heat pipe must start successfully before it can commence its service. The startup transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe startup behaviors. Topics include the four startup scenarios, the initial fluid distribution between the evaporator and reservoir that determines the startup scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power startup, and methods to enhance the startup success. Also addressed are the pressure spike and pressure surge during the startup transient, and repeated cycles of loop startup and shutdown under certain conditions.

  14. Microprocessor control system for 200-kilowatt Mod-OA wind turbines

    NASA Technical Reports Server (NTRS)

    Nyland, T. W.; Birchenough, A. G.

    1982-01-01

    The microprocessor system and program used to control the operation of the 200-kW Mod-OA wind turbines is described. The system is programmed to begin startup and shutdown sequences automatically and to control yaw motion. Rotor speed and power output are controlled with integral and proportional control of the blade pitch angle. Included in the report are a description of the hardware and a discussion of the software programming technique. A listing of the PL/M software program is given.

  15. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  16. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  17. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  18. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  19. Training Programmes as Incubators.

    ERIC Educational Resources Information Center

    Erikson, Truls; Gjellan, Are

    2003-01-01

    A European technological university conducts quarterly incubator programs in which teams develop ideas into viable business plans. Analysis indicates that 57 of 102 ideas resulted in successful technology-based businesses and more than 400 students received hands-on experience in business start-up. (Contains 16 references.) (SK)

  20. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  1. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  2. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  3. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  4. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  5. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  6. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  7. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  8. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  9. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  10. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  11. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  12. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  13. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  14. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  15. Schools and Libraries Corporation: Actions Needed To Strengthen Program Integrity Operations before Committing Funds. Testimony before the Committee on Commerce, Science, and Transportation, U.S. Senate.

    ERIC Educational Resources Information Center

    England-Joseph, Judy A.

    The Telecommunications Act of 1996 expanded universal support to eligible schools and libraries. To administer the universal service program for schools and libraries, the Federal Communications Commission (FCC) directed the creation of the Schools and Libraries Corporation (Corporation). As a start-up operation, the Corporation has had to develop…

  16. 7 CFR 246.4 - State plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... distribute nutrition services and administration funds, including start-up funds, to local agencies operating... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program is operated in accordance with the State Plan. FNS will provide written approval or denial of a...

  17. 7 CFR 246.4 - State plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... distribute nutrition services and administration funds, including start-up funds, to local agencies operating... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program is operated in accordance with the State Plan. FNS will provide written approval or denial of a...

  18. Program Spotlight: Dana Farber/Harvard Cancer Center Partnership Receives $8 Million Grant

    Cancer.gov

    The UMass Boston and Dana Farber/Harvard Cancer Center PACHE Partnership received a grant to start-up a Center for Personalized Cancer Therapy on the UMass Boston campus. The center is deigned to train underrepresented students to work in cancer research.

  19. Training Materials Developed for Latino Entrepreneurs

    ERIC Educational Resources Information Center

    Abreo, Christina; Miller, Wayne; Farmer, Frank; Moon, Zola; McCullough, Stacey

    2014-01-01

    This article describes the materials and training program that Extension created to assist current and potential Latino immigrant entrepreneurs in starting businesses in Arkansas. The content-based educational materials describe the process for starting a new business, government regulatory requirements, start-up costs and considerations, and how…

  20. 40 CFR 63.8694 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...)(iii) through (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, performance evaluations, and opacity and visible emission observations as required in § 63.10(b)(2)(viii). (b... Section 63.8694 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...

  1. 77 FR 56631 - TRICARE, Formerly Known as the Civilian Health and Medical Program of the Uniformed Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... Medical Program of the Uniformed Services; Fiscal Year 2013 Continued Health Care Benefit Program Premium Update AGENCY: Office of the Secretary, DoD. ACTION: Notice of updated continued health care benefit program premiums for fiscal year 2013. SUMMARY: This notice provides the updated Continued Health Care...

  2. 40 CFR Table 3 to Subpart Uuuuu of... - Work Practice Standards

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup You must operate all CMS during startup. Startup means either the first-ever firing of fuel in a... for any purpose. Startup ends when any of the steam from the boiler is used to generate electricity for sale over the grid or for any other purpose (including on site use). For startup of a unit, you...

  3. 40 CFR Table 3 to Subpart Uuuuu of... - Work Practice Standards

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup You must operate all CMS during startup. Startup means either the first-ever firing of fuel in a... for any purpose. Startup ends when any of the steam from the boiler is used to generate electricity for sale over the grid or for any other purpose (including on site use). For startup of a unit, you...

  4. 40 CFR Table 3 to Subpart Uuuuu of... - Work Practice Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup You must operate all CMS during startup. Startup means either the first-ever firing of fuel in a... for any purpose. Startup ends when any of the steam from the boiler is used to generate electricity for sale over the grid or for any other purpose (including on site use). For startup of a unit, you...

  5. Computer program CDCID: an automated quality control program using CDC update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singer, G.L.; Aguilar, F.

    1984-04-01

    A computer program, CDCID, has been developed in coordination with a quality control program to provide a highly automated method of documenting changes to computer codes at EG and G Idaho, Inc. The method uses the standard CDC UPDATE program in such a manner that updates and their associated documentation are easily made and retrieved in various formats. The method allows each card image of a source program to point to the document which describes it, who created the card, and when it was created. The method described is applicable to the quality control of computer programs in general. Themore » computer program described is executable only on CDC computing systems, but the program could be modified and applied to any computing system with an adequate updating program.« less

  6. 40 CFR Table 1a to Subpart Zzzz of... - Emission Limitations for Existing, New, and Reconstructed Spark Ignition, 4SRB Stationary RICE...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... following emission limitation, except during periods of startup . . . During periods of startup you must... the engine's startup time at startup to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the non-startup emission limitations apply.1 b. Limit the...

  7. 40 CFR Table 1a to Subpart Zzzz of... - Emission Limitations for Existing, New, and Reconstructed Spark Ignition, 4SRB Stationary RICE...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... following emission limitation, except during periods of startup . . . During periods of startup you must... the engine's startup time at startup to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the non-startup emission limitations apply.1 b. Limit the...

  8. 40 CFR Table 1a to Subpart Zzzz of... - Emission Limitations for Existing, New, and Reconstructed Spark Ignition, 4SRB Stationary RICE...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... following emission limitation, except during periods of startup . . . During periods of startup you must... the engine's startup time at startup to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the non-startup emission limitations apply.1 b. Limit the...

  9. Integrated Intelligent training and job aiding for combustion turbine engines

    NASA Technical Reports Server (NTRS)

    Mckeithan, Clifford M., Jr.; Quentin, George H.

    1993-01-01

    This paper describes an ongoing program to augment such an expert system gas turbine startup advisor, known as the EPRI SA VANT System, by including an intelligent training package. It will give a brief background on the SA VANT development and an overview of its evolution into a full-blown Gas Turbine Information System (GTIS) for rapid access of on-line documentation, diagnostics, and training. In particular, the paper will address: (1) the conversion of the knowledge base used by the SA VANT startup advisor so that it can be used for both training and job aiding; and (2) the hypertext-oriented user manuals being incorporated into the system for rapidly accessing on-line documentation at the job site.

  10. Tighten water-chemistry control after boiler layup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brestel, L.

    1994-01-01

    The potential for internal deposition and corrosion can affect boiler reliability by reducing thermal efficiency, tube integrity, and the time between chemical cleanings. While chemical control specifications for normal operation have been developed by consensus of manufacturers and industry, their impact on shutdowns, layups, and startups is not always appreciated. The discussion of chemical-control options applies to boiler systems operating in the medium- and high-pressure ranges. Identification and correction of root causes underlying the chemistry problems encountered and application of the principles involved should result in shorter startup times, improved control over phosphate hideout, and reduced need for chemical cleaning.more » Each of these has a significant cost impact; together, they are the true measure of a successful chemistry-control program.« less

  11. 77 FR 64524 - Advisory Committee on Infant Mortality; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... the Healthy Start Program and Healthy People 2020 infant mortality objectives. Agenda: Topics that will be discussed include the following: HRSA Update; Maternal and Child Health Bureau Update; Healthy Start Program Update; Updates from Partnering Agencies and Organizations; and ACIM's recommendations for...

  12. 78 FR 54863 - Bureau of the Census Geographically Updated Population Certification Program (GUPCP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Geographically Updated Population Certification Program (GUPCP) AGENCY: Bureau of the Census, Department of... Census (Census Bureau) will resume processing applications for certified decennial census population and... Updated Population Certification Program (GUPCP), was suspended on January 1, 2008, to accommodate the...

  13. Signature program: a platform of basket trials.

    PubMed

    Slosberg, Eric D; Kang, Barinder P; Peguero, Julio; Taylor, Matthew; Bauer, Todd M; Berry, Donald A; Braiteh, Fadi; Spira, Alexander; Meric-Bernstam, Funda; Stein, Steven; Piha-Paul, Sarina A; Salvado, August

    2018-04-20

    Investigating targeted therapies can be challenging due to diverse tumor mutations and slow patient accrual for clinical studies. The Signature Program is a series of 8 phase 2, agent-specific basket protocols using a rapid study start-up approach involving no predetermined study sites. Each protocol evaluated 1 agent (buparlisib, dovitinib, binimetinib, encorafenib, sonidegib, BGJ398, ceritinib, or ribociclib) in patients with solid or hematologic malignancies and an actionable mutation. The primary endpoint of each study was the clinical benefit rate (ie, complete or partial response, or stable disease) at 16 weeks. A total of 192 individual sites were opened in the United States, with a median start-up time of 3.6 weeks. The most common tumor types among the 595 treated patients were colorectal (9.2%), non-small cell lung adenocarcinoma (9.1%), and ovarian (8.4%). Frequent genetic alterations were in PIK3CA , RAS , p16 , and PTEN . Overall, 30 partial or complete responses were observed with 6 compounds in 16 tumor types. The Signature Program presents a unique and successful approach for rapid signal finding across multiple tumors and allowed various agents to be evaluated in patients with rare alterations. Incorporating these program features in conventional studies could lead to improved trial efficiencies and patient outcomes.

  14. Signature program: a platform of basket trials

    PubMed Central

    Peguero, Julio; Taylor, Matthew; Bauer, Todd M.; Berry, Donald A.; Braiteh, Fadi; Spira, Alexander; Meric-Bernstam, Funda; Stein, Steven; Piha-Paul, Sarina A.; Salvado, August

    2018-01-01

    Investigating targeted therapies can be challenging due to diverse tumor mutations and slow patient accrual for clinical studies. The Signature Program is a series of 8 phase 2, agent-specific basket protocols using a rapid study start-up approach involving no predetermined study sites. Each protocol evaluated 1 agent (buparlisib, dovitinib, binimetinib, encorafenib, sonidegib, BGJ398, ceritinib, or ribociclib) in patients with solid or hematologic malignancies and an actionable mutation. The primary endpoint of each study was the clinical benefit rate (ie, complete or partial response, or stable disease) at 16 weeks. A total of 192 individual sites were opened in the United States, with a median start-up time of 3.6 weeks. The most common tumor types among the 595 treated patients were colorectal (9.2%), non-small cell lung adenocarcinoma (9.1%), and ovarian (8.4%). Frequent genetic alterations were in PIK3CA, RAS, p16, and PTEN. Overall, 30 partial or complete responses were observed with 6 compounds in 16 tumor types. The Signature Program presents a unique and successful approach for rapid signal finding across multiple tumors and allowed various agents to be evaluated in patients with rare alterations. Incorporating these program features in conventional studies could lead to improved trial efficiencies and patient outcomes. PMID:29765547

  15. Genetic Counselors in Startup Companies: Redefining the Genetic Counselor Role.

    PubMed

    Rabideau, Marina M; Wong, Kenny; Gordon, Erynn S; Ryan, Lauren

    2016-08-01

    Genetic counselors (GCs) have recently begun moving into non-clinic based roles in increasing numbers. A relatively new role for GCs is working for startup companies. Startups are newly established companies in the phase of developing and researching new scalable businesses. This article explores the experiences of four GCs working at different startup companies and aims to provide resources for GCs interested in learning more about these types of roles. The article describes startup culture, including a relatively flat organizational structure, quick product iterations, and flexibility, among other unique cultural characteristics. Financial considerations are described, including how to understand and evaluate a company's financial status, along with a brief explanation of alternate forms of compensation including stock options and equity. Specifically, the article details the uncertainties and rewards of working in a fast-paced startup environment that affords opportunities to try new roles and use the genetic counseling skill set in new ways. This article aims to aid GCs in determining whether a startup environment would be a good fit, learning how to evaluate a specific startup, and understanding how to market themselves for positions at startups.

  16. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  17. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... may come from plans you developed for other purposes such as a Standard Operating Procedure manual or... source is operational. The SSM plan provides detailed procedures for operating and maintaining your...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  18. Accelerators as Authentic Training Experiences for Nascent Entrepreneurs

    ERIC Educational Resources Information Center

    Miles, Morgan P.; de Vries, Huibert; Harrison, Geoff; Bliemel, Martin; de Klerk, Saskia; Kasouf, Chick J.

    2017-01-01

    Purpose: The purpose of this paper is to address the role of accelerators as authentic learning-based entrepreneurial training programs. Accelerators facilitate the development and assessment of entrepreneurial competencies in nascent entrepreneurs through the process of creating a start-up venture. Design/methodology/approach: Survey data from…

  19. 76 FR 29728 - Notice of Intent To Prepare an Environmental Impact Statement and Notice of Potential Floodplain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...

  20. Update on the DIII-D ECH system: experiments, gyrotrons, advanced diagnostics, and controls

    NASA Astrophysics Data System (ADS)

    Lohr, John; Brambila, Rigoberto; Cengher, Mirela; Gorelov, Yuri; Grosnickle, William; Moeller, Charles; Ponce, Dan; Torrezan, Antonio; Ives, Lawrence; Reed, Michael; Blank, Monica; Felch, Kevin; Parisuaña, Claudia; LeViness, Alexandra

    2017-08-01

    The ECH system on DIII-D is continuing to be upgraded, while simultaneously being operated nearly daily for plasma experiments. The latest major hardware addition is a new 117.5 GHz gyrotron, which generated 1.7 MW for short pulses during factory testing. A new gyrotron control system based on Field Programmable Gate Array (FPGA) technology with very high speed system data acquisition has significantly increased the flexibility and reliability of individual gyrotron operation. We have improved the performance of the fast mirror scanning, both by increasing the scan speeds and by adding new algorithms for controlling the aiming using commands generated by the Plasma Control System (PCS). The system is used for transport studies, ELM control, current profile control, non-inductive current generation, suppression of MHD modes, startup assist, plasma density control, and other applications. A program of protective measures, which has been in place for more than two years, has eliminated damage to hardware and diagnostics caused by overdense operation. Other activities not directly related to fusion research have used the ECH system to test components, study methods for improving production of semiconductor junctions and materials, and test the feasibility of using ground based microwave systems to power satellites into orbit.

  1. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...

  2. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...

  3. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...

  4. Optimizing the atom types of proteins through iterative knowledge-based potentials

    NASA Astrophysics Data System (ADS)

    Wang, Xin-Xiang; Huang, Sheng-You

    2018-02-01

    Not Available Project supported by the National Natural Science Foundation of China (Grant No. 31670724), the National Key Research and Development Program of China (Grant Nos. 2016YFC1305800 and 2016YFC1305805), and the Startup Grant of Huazhong University of Science and Technology, China.

  5. People's Empowerment and Adult Literacy Programs.

    ERIC Educational Resources Information Center

    Kumari, P. Vasantha

    1999-01-01

    Analysis of data from 1,600 adult participants in Total Literacy Campaigns in India shows how adult acquisition of literacy skills improves their health habits, increases their participation in business startups and voting, and gives them higher aspirations for their children. Children have better enrollment and health status. Women improve their…

  6. 40 CFR 80.1352 - What are the pre-compliance reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Benzene concentration. An estimate of the average gasoline benzene concentration corresponding to the time... engineering and permitting, Procurement and Construction, and Commissioning and startup. (7) Basic information regarding the selected technology pathway for compliance (e.g., precursor re-routing or other technologies...

  7. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  8. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  9. 40 CFR 63.2852 - What is a startup, shutdown, and malfunction plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the procedures may come from plans you developed for other purposes such as a Standard Operating... as long as the source is operational. The SSM plan provides detailed procedures for operating and...) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  10. 40 CFR 63.7505 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission limits (including operating limits) and the work practice standards in this subpart at all times... you have an applicable emission limit or work practice standard, you must develop a written startup... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR...

  11. Wings: Women Entrepreneurs Take Flight.

    ERIC Educational Resources Information Center

    Baldwin, Fred D.

    1997-01-01

    Women's Initiative Networking Groups (WINGS) provides low- and moderate-income women in Appalachian Kentucky with training in business skills, contacts, and other resources they need to succeed as entrepreneurs. The women form informal networks to share business know-how and support for small business startup and operations. The program plans to…

  12. Naval Postgraduate School Solar Cell Array Tester

    DTIC Science & Technology

    2010-12-01

    PROGRAM MANAGEMENT ................................45 1. SCHEDULE .....................................47 B. BUDGET...budget and schedule from December 2009 to September 2010. In addition, a total development cost estimate, including labor, equipment, and testing... scheduler becomes active, all tasks become eligible to run, and normal operations begin. Figure 21 shows a diagram of the startup actions [32

  13. Stop Rape Crisis Center: An Exemplary Project.

    ERIC Educational Resources Information Center

    Whitcomb, Debra; And Others

    An exemplary project, the Stop Rape Crisis Center in Baton Rouge, Louisiana, which was initially funded by the Law Enforcement Assistance Administration (LEAA), is described. Issues addressed include the following: (1) initlal start-up and continuing program assessment; (2) staffing and the use of volunteers; (3) coordination with law enforcement…

  14. Electrodeless Plasma Source: Phase II Update

    NASA Astrophysics Data System (ADS)

    Prager, James; Ziemba, Timothy; Miller, Kenneth

    2012-10-01

    Eagle Harbor Technologies, in collaboration with the University of Washington, has developed a low-impurity, electrode-less plasma source (EPS) for start-up and source plasma injection for fusion science applications. In order to not interfere with the experiment, a pre-ionizer/plasma source must meet a few critical criteria including low impurity production, low electromagnetic interference (EMI), and minimal disruption to the magnetic geometry of the experiment. This system was designed to be UHV compatible and bakable. Here we present the results of the EPS Phase II upgrade. The output plasma density was increased by two orders of magnitude to >10^17 m-3 in hydrogen with no magnetic field injected. EPS system integration with the HIT-SI experiment has begun.

  15. Spent nuclear fuel project cold vacuum drying facility operations manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    IRWIN, J.J.

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of themore » CVDF until the CVDF final ORR is approved.« less

  16. SOURCELESS STARTUP. A MACHINE CODE FOR COMPUTING LOW-SOURCE REACTOR STARTUPS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacMillan, D.B.

    1960-06-01

    >A revision to the sourceless start-up code is presented. The code solves a system of differential equations encountered in computing the probability distribution of activity at an observed power level during reactor start-up from a very low source level. (J.R.D.)

  17. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...

  18. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...

  19. Impact of chemical plant start-up emissions on ambient ozone concentration

    NASA Astrophysics Data System (ADS)

    Ge, Sijie; Wang, Sujing; Xu, Qiang; Ho, Thomas

    2017-09-01

    Flare emissions, especially start-up flare emissions, during chemical plant operations generate large amounts of ozone precursors that may cause highly localized and transient ground-level ozone increment. Such an adverse ozone impact could be aggravated by the synergies of multiple plant start-ups in an industrial zone. In this paper, a systematic study on ozone increment superposition due to chemical plant start-up emissions has been performed. It employs dynamic flaring profiles of two olefin plants' start-ups to investigate the superposition of the regional 1-hr ozone increment. It also summaries the superposition trend by manipulating the starting time (00:00-10:00) of plant start-up operations and the plant distance (4-32 km). The study indicates that the ozone increment induced by simultaneous start-up emissions from multiple chemical plants generally does not follow the linear superposition of the ozone increment induced by individual plant start-ups. Meanwhile, the trend of such nonlinear superposition related to the temporal (starting time and operating hours of plant start-ups) and spatial (plant distance) factors is also disclosed. This paper couples dynamic simulations of chemical plant start-up operations with air-quality modeling and statistical methods to examine the regional ozone impact. It could be helpful for technical decision support for cost-effective air-quality and industrial flare emission controls.

  20. Closed-form analytical solutions of high-temperature heat pipe startup and frozen startup limitation

    NASA Technical Reports Server (NTRS)

    Cao, Y.; Faghri, A.

    1992-01-01

    Previous numerical and experimental studies indicate that the high-temperature heat pipe startup process is characterized by a moving hot zone with relatively sharp fronts. Based on the above observation, a flat-front model for an approximate analytical solution is proposed. A closed-form solution related to the temperature distribution in the hot zone and the hot zone length as a function of time are obtained. The analytical results agree well with the corresponding experimental data, and provide a quick prediction method for the heat pipe startup performance. Finally, a heat pipe limitation related to the frozen startup process is identified, and an explicit criterion for the high-temperature heat pipe startup is derived. The frozen startup limit identified in this paper provides a fundamental guidance for high-temperature heat pipe design.

  1. 75 FR 81138 - Medicare Program; Home Health Prospective Payment System Rate Update for Calendar Year 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... [CMS-1510-CN2] RIN 0938-AP88 Medicare Program; Home Health Prospective Payment System Rate Update for Calendar Year 2011; Changes in Certification Requirements for Home Health Agencies and Hospices AGENCY... ``Medicare Program; Home Health Prospective Payment System Rate Update for Calendar Year 2011; Changes in...

  2. 77 FR 19230 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    .... Precious corals fishery and coral reef habitat status. iv. Update on Bio-Sampling Program data summary. v... precious coral fisheries. iv. Coral reef habitat status. v. Update on Bio-Sampling Program and Spearfishing... fisheries. iv. Precious corals fishery and coral reef habitat status. v. Update on Bio-Sampling Program Data...

  3. 40 CFR 63.762 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...

  4. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  5. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  6. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  7. 40 CFR 63.762 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...

  8. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  9. 40 CFR 63.1272 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...

  10. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...

  11. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...

  12. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  13. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...

  14. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  15. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  16. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  17. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  18. 40 CFR 63.1272 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...

  19. 40 CFR 63.762 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...

  20. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  1. 40 CFR 63.1272 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...

  2. An analysis of the sliding pressure start-up of SCWR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, F.; Yang, J.; Li, H.

    In this paper, the preliminary sliding pressure start-up system and scheme of supercritical water-cooled reactor in CGNPC (CGN-SCWR) were proposed. Thermal-hydraulic behavior in start-up procedures was analyzed in detail by employing advanced reactor subchannel analysis software ATHAS. The maximum cladding temperature (MCT for short) and core power of fuel assembly during the whole start-up process were investigated comparatively. The results show that the recommended start-up scheme meets the design requirements from the perspective of thermal-hydraulic. (authors)

  3. Federal Geothermal Research Program Update - Fiscal Year 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, P.T.

    2002-08-31

    This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2001. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

  4. 78 FR 73753 - Partnerships; Start-Up Expenditures; Organization and Syndication Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... deduct start-up expenditures in the taxable year in which the active trade or business begins. The amount... begins. All start-up expenditures that relate to the active trade or business are considered in...(b) to amortize start-up expenditures for the taxable year in which the active trade or business to...

  5. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  6. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Reporting § 60.2953 What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s...

  7. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  8. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  9. 40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...

  10. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  11. 40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...

  12. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning...

  13. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 2001 Recordkeeping and Reporting § 60.2195 What information must I submit prior to initial startup? You... startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning capacity. (c) The...

  14. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  15. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  16. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  17. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  18. 40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...

  19. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning...

  20. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning...

  1. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What happens during periods of startup... Emission Limitations and Operating Limits § 60.2918 What happens during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups...

  2. 40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup...-Emission Limitations and Operating Limits § 60.2685 What happens during periods of startup, shutdown, and... startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3 hours. Effective Date...

  3. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  4. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned...

  5. 40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...

  6. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  7. 40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...

  8. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  9. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  10. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  11. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Reporting § 60.2953 What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s...

  12. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  13. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  14. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 2001 Recordkeeping and Reporting § 60.2195 What information must I submit prior to initial startup? You... startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning capacity. (c) The...

  15. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What happens during periods of startup... Emission Limitations and Operating Limits § 60.2918 What happens during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups...

  16. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  17. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  18. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  19. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 2001 Recordkeeping and Reporting § 60.2195 What information must I submit prior to initial startup? You... startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning capacity. (c) The...

  20. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned...

  1. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...

  2. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... has been reconstructed such that it is an affected source, that has an initial startup after the... source that has an initial startup after the effective date of this subpart and for which an application... startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5), after the effective date of...

  3. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...

  4. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...

  5. 78 FR 41013 - Medicare and Medicaid Programs; Home Health Prospective Payment System Rate Update for CY 2014...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... [CMS-1450-CN] RIN 0938-AR52 Medicare and Medicaid Programs; Home Health Prospective Payment System Rate Update for CY 2014, Home Health Quality Reporting Requirements, and Cost Allocation of Home Health Survey... period titled ``Medicare and Medicaid Programs; Home Health Prospective Payment System Rate Update for CY...

  6. A Longitudinal Analysis of the Reid List of First Programming Languages

    ERIC Educational Resources Information Center

    Siegfried, Robert M.; Siegfried, Jason P.; Alexandro, Gina

    2016-01-01

    Throughout the 1990s, Richard Reid of Michigan State University maintained a list showing the first programming language used in introductory programming courses taken by computer science and information systems majors; it was updated for several years afterwards with the most recent update done in 2011. This is a follow-up to that last update of…

  7. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  8. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  9. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  10. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  11. 32 CFR 37.885 - May I require updated program plans?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...

  12. Physics of Tokamak Plasma Start-up

    NASA Astrophysics Data System (ADS)

    Mueller, Dennis

    2012-10-01

    This tutorial describes and reviews the state-of-art in tokamak plasma start-up and its importance to next step devices such as ITER, a Fusion Nuclear Science Facility and a Tokamak/ST demo. Tokamak plasma start-up includes breakdown of the initial gas, ramp-up of the plasma current to its final value and the control of plasma parameters during those phases. Tokamaks rely on an inductive component, typically a central solenoid, which has enabled attainment of high performance levels that has enabled the construction of the ITER device. Optimizing the inductive start-up phase continues to be an area of active research, especially in regards to achieving ITER scenarios. A new generation of superconducting tokamaks, EAST and KSTAR, experiments on DIII-D and operation with JET's ITER-like wall are contributing towards this effort. Inductive start-up relies on transformer action to generate a toroidal loop voltage and successful start-up is determined by gas breakdown, avalanche physics and plasma-wall interaction. The goal of achieving steady-sate tokamak operation has motivated interest in other methods for start-up that do not rely on the central solenoid. These include Coaxial Helicity Injection, outer poloidal field coil start-up, and point source helicity injection, which have achieved 200, 150 and 100 kA respectively of toroidal current on closed flux surfaces. Other methods including merging reconnection startup and Electron Bernstein Wave (EBW) plasma start-up are being studied on various devices. EBW start-up generates a directed electron channel due to wave particle interaction physics while the other methods mentioned rely on magnetic helicity injection and magnetic reconnection which are being modeled and understood using NIMROD code simulations.

  13. [Start-up grants for young scientists in German medical universities : Can the clinical scientist be saved?

    PubMed

    Pabst, R; Linke, P B; Neudeck, N B A; Schmiel, M; Ernst, S B

    2016-12-01

    German medical faculties currently have severe financial problems. There is the conflict between financing teaching medical students, inpatient and outpatient costs and supporting basic and applied research. Young postdocs can apply for a grant to start research projects to establish techniques on publishing data as a basis for applying for grants from the German Research Foundation or foundations with a critical review system. Successful applicants from the years 1998-2011 were asked to answer a questionnaire. The annual number of applications ranged from 28 to 96 per year. Within the first period of our analysis ranging from 1998 to 2004, a mean number of 69.5 % ± 14.0 % of submitted grant applications were approved annually in comparison to an average approval of 30.9 % ± 11 % in the years 2006-2001. In total 353 projects were funded with a mean amount of money for a project of approximately 18,640 EUR. The mean amount of external grant money following the start-up period was 7.2 times the money initially spent. That is an excellent return of investment. There were no differences between applicants from the department of surgery or department of internal medicine. In the meantime, 56 % of men and 42 % of women have achieved the academic degree university lecturer (privatdozent). Furthermore, 71 % of the participants evaluated this start-up research as supportive for their postdoctoral qualification (habilitation). The program for initial investment for young postdocs by internal start-up grants is overall successful.

  14. The Effect on Economic Development of an Entrepreneurship Program at a North Carolina Community College

    ERIC Educational Resources Information Center

    Fox, Joseph L.; Pennington, Kevin

    2009-01-01

    This article presents the findings from a review of a community college's entrepreneurship course designed to encourage business start-ups. The study utilized a survey to obtain information from 142 Haywood Community College students who completed the Rural Entrepreneurship through Action Learning (REAL) course. Qualitative interviews were…

  15. PNNL Delivers Expertise, Technology to Biofuels Start-up, InEnTec

    ScienceCinema

    Surma, Jeff

    2017-12-09

    Initially through its Entrepreneurial Leave of Absence Program, PNNL gives biofuels innovators a start in opening up a new business based on technology developed for incinerating waste on the Hanford Site. Today, the companies Plasma Enhanced Melters are in operation around the world converting organic waste into valuable, clean fuels.

  16. NREL Announces Third Round of Start-Ups to Participate in the Wells Fargo

    Science.gov Websites

    innovative commercial building technologies Photo of NREL researchers talking. George Lee and Steven Low that provide scalable solutions to reduce the energy impact of commercial buildings. Including Round 3 kit for commercial buildings. Referred to apply to program by University of Colorado Boulder Software

  17. A Report on a Ten Year Old Public University

    ERIC Educational Resources Information Center

    Cordeiro, William P.; Muraoka, Dennis

    2014-01-01

    California State University Channel Islands (CI) was founded in 2001 (in Camarillo, CA) and admitted its first students in 2002. Over the ensuing decade, the campus has transitioned from a start-up institution to a regionally accredited comprehensive university offering 23 baccalaureate and 6 graduate degree programs. This transition has occurred…

  18. 40 CFR 62.14422 - What are the requirements for a training course that is not part of a State-approved program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... subjects: (1) Environmental concerns, including pathogen destruction and types of emissions; (2) Basic combustion principles, including products of combustion; (3) Operation of the type of incinerator to be used by the operator, including proper startup, waste charging, and shutdown procedures; (4) Combustion...

  19. 40 CFR 62.14422 - What are the requirements for a training course that is not part of a State-approved program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: (1) Environmental concerns, including pathogen destruction and types of emissions; (2) Basic combustion principles, including products of combustion; (3) Operation of the type of incinerator to be used by the operator, including proper startup, waste charging, and shutdown procedures; (4) Combustion...

  20. 40 CFR 62.14422 - What are the requirements for a training course that is not part of a State-approved program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... subjects: (1) Environmental concerns, including pathogen destruction and types of emissions; (2) Basic combustion principles, including products of combustion; (3) Operation of the type of incinerator to be used by the operator, including proper startup, waste charging, and shutdown procedures; (4) Combustion...

  1. 40 CFR 62.14422 - What are the requirements for a training course that is not part of a State-approved program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: (1) Environmental concerns, including pathogen destruction and types of emissions; (2) Basic combustion principles, including products of combustion; (3) Operation of the type of incinerator to be used by the operator, including proper startup, waste charging, and shutdown procedures; (4) Combustion...

  2. 40 CFR 62.14422 - What are the requirements for a training course that is not part of a State-approved program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...: (1) Environmental concerns, including pathogen destruction and types of emissions; (2) Basic combustion principles, including products of combustion; (3) Operation of the type of incinerator to be used by the operator, including proper startup, waste charging, and shutdown procedures; (4) Combustion...

  3. 78 FR 72151 - Proposed Collection; Comment Request on Information Collection Tools Relating to Using Omnibus...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... satisfying experience with the Agency's programs. This feedback will provide insights into customer or stakeholder perceptions, experiences and expectations, provide an early warning of issues with service, or...) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to...

  4. 26 CFR 1.195-1T - Election to amortize start-up expenditures (temporary).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... business, or $5,000 (reduced (but not below zero) by the amount by which the start-up expenditures exceed... beginning with the month in which the active trade or business begins. All start-up expenditures that relate to the active trade or business are considered in determining whether the start-up expenditures...

  5. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  6. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  7. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  8. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  9. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  10. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  11. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  12. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  13. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  14. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  15. 40 CFR Table 4 to Subpart Cccc of... - Summary of Reporting Requirements a

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements • Waste management plan • Anticipated date of initial startup § 60.2190 Startup notification Prior to initial startup • Type of waste to be burned• Maximum design waste burning capacity • Anticipated... occurred during a period of startup, shutdown, or malfunction § 60.2215 and 60.2220 Qualified operator...

  16. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  17. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  18. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  19. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  20. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  1. 40 CFR Table 4 to Subpart Cccc of... - Summary of Reporting Requirements a

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements • Waste management plan • Anticipated date of initial startup § 60.2190 Startup notification Prior to initial startup • Type of waste to be burned• Maximum design waste burning capacity • Anticipated... occurred during a period of startup, shutdown, or malfunction § 60.2215 and 60.2220 Qualified operator...

  2. 40 CFR Table 4 to Subpart Cccc of... - Summary of Reporting Requirements a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements • Waste management plan • Anticipated date of initial startup § 60.2190 Startup notification Prior to initial startup • Type of waste to be burned• Maximum design waste burning capacity • Anticipated... occurred during a period of startup, shutdown, or malfunction § 60.2215 and 60.2220 Qualified operator...

  3. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  4. Preliminary Experiment of Non-Inductive Plasma Current Startup in SUNIST Spherical Tokamak

    NASA Astrophysics Data System (ADS)

    He, Yexi; Zhang, Liang; Xie, Lifeng; Tang, Yi; Yang, Xuanzong; Feng, Chunhua; Fu, Hongjun

    2006-01-01

    The non-inductive plasma current startup is an important motivation in SUNIST spherical tokamak. In the recent experiment, the magnetron microwave system of 100 kW and 2.45 GHz has been used to the ECR plasma current startup. Besides the toroidal field, a vertical field was applied to generate preliminary toroidal plasma current without the action of the central solenoid. As the evidence of plasma current startup with the effect of vertical field drift, the direction of plasma current is changed when the direction of vertical field changes during the ECR plasma current startup discharge. We also observed a maximum plasma current by scanning vertical field in both directions. Additionally, we used electrode discharge to assist the ECR plasma current startup.

  5. Hot Bodies 400 Corporation: A Simple Guide for Small Business Startups [and] Teamwork: Problems and Solutions Workbook. For What You Wear...or Wear Not! An ICA Publication in Business and Behavioral Science.

    ERIC Educational Resources Information Center

    Bonilla, Carlos A., Ed.; Righetti, Candace S., Ed.

    Many cooperative learning programs are merely exhibitions of the willingness to work with others. They apply teams of people to do work that could be accomplished just as well by individuals. Successful programs focus on collaborative learning that fosters working together to solve problems beyond the capacity of any individual. A cooperative…

  6. A new model for graduate education and innovation in medical technology.

    PubMed

    Yazdi, Youseph; Acharya, Soumyadipta

    2013-09-01

    We describe a new model of graduate education in bioengineering innovation and design- a year long Master's degree program that educates engineers in the process of healthcare technology innovation for both advanced and low-resource global markets. Students are trained in an iterative "Spiral Innovation" approach that ensures early, staged, and repeated examination of all key elements of a successful medical device. This includes clinical immersion based problem identification and assessment (at Johns Hopkins Medicine and abroad), team based concept and business model development, and project planning based on iterative technical and business plan de-risking. The experiential, project based learning process is closely supported by several core courses in business, design, and engineering. Students in the program work on two team based projects, one focused on addressing healthcare needs in advanced markets and a second focused on low-resource settings. The program recently completed its fourth year of existence, and has graduated 61 students, who have continued on to industry or startups (one half), additional graduate education, or medical school (one third), or our own Global Health Innovation Fellowships. Over the 4 years, the program has sponsored 10 global health teams and 14 domestic/advanced market medtech teams, and launched 5 startups, of which 4 are still active. Projects have attracted over US$2.5M in follow-on awards and grants, that are supporting the continued development of over a dozen projects.

  7. SOP 98-5 brings uniformity to reporting start-up costs.

    PubMed

    Luecke, R W; Meeting, D T

    1999-08-01

    The American Institute of Certified Public Accountants (AICPA) issued Statement of Position (SOP) No. 98-5, Reporting on the Costs of Start-Up Activities, in April 1998 to provide organizations with guidance on how to report start-up and organization costs. Because some companies were expensing start-up costs while other companies were capitalizing start-up costs with a variety of periods over which to amortize costs, it was difficult to compare companies' financial statements. SOP No. 98-5 will bring uniformity to the treatment of start-up and organization costs by dictating that these costs be expensed as incurred. AICPA's Accounting Standards Executive Committee adopted an intentionally broad definition of start-up costs to capture the vast majority of costs associated with starting up an organization. SOP No. 98-5 takes effect for financial statements for fiscal years beginning after December 15, 1998, but can be applied earlier for fiscal years for which financial statements have not been issued.

  8. Update of FDOT state park & ride lot program planning manual chapters 3, 4, and 6

    DOT National Transportation Integrated Search

    2001-04-01

    Portions of the Florida Department of Transportation (FDOT) State Park & Ride Lot Program Planning Manual, first published in 1989 and revised in 1996, were updated. The scope included examination, testing, and updating, as necessary, the planning fo...

  9. 40 CFR Table 2a to Subpart Zzzz of... - Emission Limitations for New and Reconstructed 2SLB and Compression Ignition Stationary RICE >500...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet the following emission limitation, except during periods of startup . . . During periods of startup you must . . . 1. 2SLB stationary RICE a. Reduce CO emissions by 58 percent or more; orb. Limit... time spent at idle and minimize the engine's startup time at startup to a period needed for appropriate...

  10. 40 CFR Table 2a to Subpart Zzzz of... - Emission Limitations for New and Reconstructed 2SLB and Compression Ignition Stationary RICE >500...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet the following emission limitation, except during periods of startup . . . During periods of startup you must . . . 1. 2SLB stationary RICE a. Reduce CO emissions by 58 percent or more; orb. Limit... time spent at idle and minimize the engine's startup time at startup to a period needed for appropriate...

  11. 40 CFR Table 2a to Subpart Zzzz of... - Emission Limitations for New and Reconstructed 2SLB and Compression Ignition Stationary RICE >500...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet the following emission limitation, except during periods of startup . . . During periods of startup you must . . . 1. 2SLB stationary RICE a. Reduce CO emissions by 58 percent or more; orb. Limit... time spent at idle and minimize the engine's startup time at startup to a period needed for appropriate...

  12. Documentation of structures branch programs and program updates. Project 3200

    NASA Technical Reports Server (NTRS)

    Probe, D. G.

    1975-01-01

    Update programming of applications programs for the integrated structural analysis system is reported. An attempt is made to layout a standard document format for the preparation of program documents. Documentation which involves changes, additions, and I/O capability revisions to existing programs includes a checklist which should be reviewed each time a programming effort is documented.

  13. The 125 MW Upper Mahiao geothermal power plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forte, N.

    1996-12-31

    The 125 MW Upper Mahiao power plant, the first geothermal power project to be financed under a Build-Own-Operate-and-Transfer (BOOT) arrangement in the Philippines, expected to complete its start-up testing in August of this year. This plant uses Ormat`s environmentally benign technology and is both the largest geothermal steam/binary combined cycle plant as well as the largest geothermal power plant utilizing air cooled condensers. The Ormat designed and constructed plant was developed under a fast track program, with some two years from the April 1994 contract signing through design, engineering, construction and startup. The plant is owned and operated by amore » subsidiary of CalEnergy Co., Inc. and supplies power to PNOC-Energy Development Corporation for the National Power Corporation (Napocor) national power grid in the Philippines.« less

  14. Medicare Program; FY 2018 Hospice Wage Index and Payment Rate Update and Hospice Quality Reporting Requirements. Final rule.

    PubMed

    2017-08-04

    This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2018. Additionally, this rule includes new quality measures and provides an update on the hospice quality reporting program.

  15. The Story of a Typical Atypical Graduate of the Physics Entrepreneurship Program at Case Western Reserve University

    NASA Astrophysics Data System (ADS)

    Luta, Adele

    2012-02-01

    An entrepreneurial perspective to life can lead to wearing a myriad of hats. Long gone is the stereotypical start-up role. Entrepreneurs now hold physics degrees and procure innovation when called upon. An alumni of the Physics Entrepreneurship Program, Adele Luta has spent the last 5 years at NASA developing an innovative approach to spacesuit sizing. Previously, she founded Eleda International consulting firm and is currently working with Adjuvat Biosciences, on a proprietary treatment pancreatic cancer.

  16. Technical progress in silicon sheet growth under DOE/JPL FSA program, 1975-1986

    NASA Technical Reports Server (NTRS)

    Kalejs, J. P.

    1986-01-01

    The technical progress made in the Silicon Sheet Growth Program during its 11 years was reviewed. At present, in 1986, only two of the original 9 techniques have survived to the start-up, pilot-plant stage in industry. These two techniques are the edge-defined, film-fed growth (EFG) technique that produces closed shape polygons, and the WEB dendritic technique that produces single ribbons. Both the status and future concerns of the EFG and WEB techniques were discussed.

  17. El Bunduq field ready for start-up. [United Arab Emirates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-10-05

    Production is scheduled to restart on the El Bunduq field. The oil field was first brought onstream in 1975 but was shut-in during 1979 due to excessive gas production. Since then, the operator, Bunduq Co., has been developing a $330-million pressure maintenance program to contain gas production and increase oil recovery. While the current field development program is based solely on reserves in the Arab D Formation, the Bunduq Co. has confirmed an oil reservoir in the shallower Arab C Formation.

  18. [From idea to standard care-a field report].

    PubMed

    Herberz, Chantal; Steidl, Ralph; Werner, Pascal; Hagen, Julia

    2018-03-01

    Digital health products and services have started to fundamentally change healthcare and prevention. Products intended for a medical use require CE-marking and potentially certification (ISO 13485) of the company. Startups play an important role in the development of new digital products and services. Two startups share their experience with these processes. Becoming a part of standard care and hence being reimbursed is a challenge for startups. For this reason, startups pursue alternative sources of income, too. The statutory health insurance's procedures for assessing new products and services are perceived as long. Startups are required to provide evidence of the benefit of their product at an early stage in the procedure. This requires time-consuming and costly studies. Startups would therefore appreciate support in generating this evidence, e. g. through adequate procedures for testing.

  19. Management Education for Small and Medium-Sized Enterprises in the European Communities.

    ERIC Educational Resources Information Center

    Holzer, Rainer

    This report summarizes the activities of various bodies providing training impetus for small and medium-sized enterprises (SMEs) in Europe on the three levels of (1) basic management education for potential small and medium-sized business owners and/or managers; (2) programs for small firm start-ups; and (3) activities to improve the management of…

  20. Plans, providers experimenting with outbound call programs for Medicare risk seniors.

    PubMed

    1997-10-01

    Putting a new spin on health care call centers: They've been used for commercial and Medicaid populations, but now plans and providers are testing the call center concept among their Medicare seniors. And while it may hold great promise for controlling utilization, there are big start-up costs and serious liability concerns.

  1. IN Like Flint: How the Innovation Incubator at UM-Flint Fosters Social Entrepreneurship in a City Remaking Itself

    ERIC Educational Resources Information Center

    Custer, Nic

    2015-01-01

    This paper focuses on how the University of Michigan-Flint's Innovation Incubator supports emerging for-profit businesses and nonprofit organizations through programming, business plan development, and ongoing mentorship. The Incubator is especially interested in supporting start-ups that address key social issues in the surrounding community,…

  2. 76 FR 21041 - Request for Certification of Compliance-Rural Industrialization Loan and Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ..., equipment and start-up costs of a cooperative based full-service retail grocery store that will carry mostly... convenience) stores). DATES: All interested parties may submit comments in writing no later than April 28... loans or grants to finance industrial and business activities in rural areas. The Secretary of Labor...

  3. Pre-Service Teachers' Knowledge for Teaching Algebra for Equity in the Middle Grades: A Preliminary Report

    ERIC Educational Resources Information Center

    Brown, Irving A.; Davis, Trina J.; Kulm, Gerald

    2011-01-01

    This article presents our plans and initial work to explore how mathematics teacher education programs can prepare teachers for diverse middle grades classrooms. It describes the start-up of a five-year National Science Foundation project to design, develop, and test technology-enriched teacher preparation strategies to address equity in algebra…

  4. Using Selected Features of Ada: A Collection of Papers.

    DTIC Science & Technology

    1982-11-09

    issues which arise in conjunction with both the startup and shutdown of any concurrent sytem are often far more complex than those which pertain to... ABCE # and 0.1 which is 1600.1999999.. .# is therefore bounded by 16#0.1999# and 16#0.199A# Literal values in an Ada program must be converted by the

  5. Marketing small animal theriogenology services--one perspective.

    PubMed

    Barber, J A

    2007-08-01

    Once a decision is made to add small animal theriogenology services to a practice, marketing strategies must be developed and implemented to attract clients to the new services. Marketing strategies for the niche market of theriogenology include start-up marketing methods, referral programs, internal marketing, and continued marketing. Marketing theriogenology services is a dynamic, ongoing process that never ends.

  6. My Kansas Library on the Web

    ERIC Educational Resources Information Center

    Moreland, Sharon

    2009-01-01

    In this article, the author, a technology consultant for the Northeast Kansas Library System (NEKLS), shares the story of how the Kansas Library on the Web (KLOW) program was created. KLOW's story begins with the initial startup fund finding and the enthusiasm of the six pilot libraries. The middle of the story has to do with building a flexible,…

  7. Technology Licensing for the Benefit of the Developing World: UC Berkeley's Socially Responsible Licensing Program

    ERIC Educational Resources Information Center

    Mimura, Carol

    2007-01-01

    In the years since the passage of the Bayh-Dole Act of 1980, university technology transfer success has been measured primarily by traditional metrics such as numbers of patents filed, revenue obtained from licensed patents and numbers of start-up companies founded to commercialize university intellectual property. Intellectual property (IP)…

  8. Workplace Communication Skills, Workplace Basic Skills, & Literacy Training in UAW-Chrysler Region 3. Final Performance Report.

    ERIC Educational Resources Information Center

    Indiana Vocational Technical Coll., Indianapolis.

    A workplace literacy partnership program model was demonstrated at four Chrysler plants in Indiana. Objectives were to improve workers' individual skills, enhance personal productivity, and increase work force job security and plant competitiveness. During the 3-month start-up phase, project staff worked with management and labor representatives…

  9. Start-Up Entrepreneurs and University Students in a Co-Learning Mode: Learning Effects of a Collaborative Entrepreneurial Coaching Programme

    ERIC Educational Resources Information Center

    Saukkonen, Juha; Nukari, Jussi; Ballard, Sharon; Levie, Jonathan

    2016-01-01

    Start-up companies have been recognized as key drivers of wealth and job creation. Many students now in universities will therefore find their future employment in start-up companies, or will found them. Success in the start-up environment requires a specific set of skills. There is a growing supply of university education for new venture creation…

  10. Computer program for updating timber resource statistics by county, with tables for Mississippi

    Treesearch

    Roy C. Beltz; Joe F. Christopher

    1970-01-01

    A computer program is available for updating Forest Survey estimates of timber growth, cut, and inventory volume by species group, for sawtimber and growing stock. Changes in rate of product removal are estimated from changes in State severance tax data. Updated tables are given for Mississippi.

  11. Detection limits and cost comparisons of human- and gull-associated conventional and quantitative PCR assays in artificial and environmental waters.

    PubMed

    Riedel, Timothy E; Zimmer-Faust, Amity G; Thulsiraj, Vanessa; Madi, Tania; Hanley, Kaitlyn T; Ebentier, Darcy L; Byappanahalli, Muruleedhara; Layton, Blythe; Raith, Meredith; Boehm, Alexandria B; Griffith, John F; Holden, Patricia A; Shanks, Orin C; Weisberg, Stephen B; Jay, Jennifer A

    2014-04-01

    Some molecular methods for tracking fecal pollution in environmental waters have both PCR and quantitative PCR (qPCR) assays available for use. To assist managers in deciding whether to implement newer qPCR techniques in routine monitoring programs, we compared detection limits (LODs) and costs of PCR and qPCR assays with identical targets that are relevant to beach water quality assessment. For human-associated assays targeting Bacteroidales HF183 genetic marker, qPCR LODs were 70 times lower and there was no effect of target matrix (artificial freshwater, environmental creek water, and environmental marine water) on PCR or qPCR LODs. The PCR startup and annual costs were the lowest, while the per reaction cost was 62% lower than the Taqman based qPCR and 180% higher than the SYBR based qPCR. For gull-associated assays, there was no significant difference between PCR and qPCR LODs, target matrix did not effect PCR or qPCR LODs, and PCR startup, annual, and per reaction costs were lower. Upgrading to qPCR involves greater startup and annual costs, but this increase may be justified in the case of the human-associated assays with lower detection limits and reduced cost per sample. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. Detection limits and cost comparisons of human- and gull-associated conventional and quantitative PCR assays in artificial and environmental waters

    USGS Publications Warehouse

    Riedel, Timothy E.; Zimmer-Faust, Amity G.; Thulsiraj, Vanessa; Madi, Tania; Hanley, Kaitlyn T.; Ebentier, Darcy L.; Byappanahalli, Muruleedhara N.; Layton, Blythe; Raith, Meredith; Boehm, Alexandria B.; Griffith, John F.; Holden, Patricia A.; Shanks, Orin C.; Weisberg, Stephen B.; Jay, Jennifer A.

    2014-01-01

    Some molecular methods for tracking fecal pollution in environmental waters have both PCR and quantitative PCR (qPCR) assays available for use. To assist managers in deciding whether to implement newer qPCR techniques in routine monitoring programs, we compared detection limits (LODs) and costs of PCR and qPCR assays with identical targets that are relevant to beach water quality assessment. For human-associated assays targeting Bacteroidales HF183 genetic marker, qPCR LODs were 70 times lower and there was no effect of target matrix (artificial freshwater, environmental creek water, and environmental marine water) on PCR or qPCR LODs. The PCR startup and annual costs were the lowest, while the per reaction cost was 62% lower than the Taqman based qPCR and 180% higher than the SYBR based qPCR. For gull-associated assays, there was no significant difference between PCR and qPCR LODs, target matrix did not effect PCR or qPCR LODs, and PCR startup, annual, and per reaction costs were lower. Upgrading to qPCR involves greater startup and annual costs, but this increase may be justified in the case of the human-associated assays with lower detection limits and reduced cost per sample.

  13. Investigation of natural circulation instability and transients in passively safe novel modular reactor

    NASA Astrophysics Data System (ADS)

    Shi, Shanbin

    The Purdue Novel Modular Reactor (NMR) is a new type small modular reactor (SMR) that belongs to the design of boiling water reactor (BWR). Specifically, the NMR is one third the height and area of a conventional BWR reactor pressure vessel (RPV) with an electric output of 50 MWe. The fuel cycle length of the NMR-50 is extended up to 10 years due to optimized neutronics design. The NMR-50 is designed with double passive engineering safety system. However, natural circulation BWRs (NCBWR) could experience certain operational difficulties due to flow instabilities that occur at low pressure and low power conditions. Static instabilities (i.e. flow excursion (Ledinegg) instability and flow pattern transition instability) and dynamic instabilities (i.e. density wave instability and flashing/condensation instability) pose a significant challenge in two-phase natural circulation systems. In order to experimentally study the natural circulation flow instability, a proper scaling methodology is needed to build a reduced-size test facility. The scaling analysis of the NMR uses a three-level scaling method, which was developed and applied for the design of the Purdue Multi-dimensional Integral Test Assembly (PUMA). Scaling criteria is derived from dimensionless field equations and constitutive equations. The scaling process is validated by the RELAP5 analysis for both steady state and startup transients. A new well-scaled natural circulation test facility is designed and constructed based on the scaling analysis of the NMR-50. The experimental facility is installed with different equipment to measure various thermal-hydraulic parameters such as pressure, temperature, mass flow rate and void fraction. Characterization tests are performed before the startup transient tests and quasi-steady tests to determine the loop flow resistance. The controlling system and data acquisition system are programmed with LabVIEW to realize the real-time control and data storage. The thermal-hydraulic and nuclear coupled startup transients are performed to investigate the flow instabilities at low pressure and low power conditions. Two different power ramps are chosen to study the effect of power density on the flow instability. The experimental startup transient tests show the existence of three different flow instability mechanisms during the low pressure startup transients, i.e., flashing instability, condensation induced instability, and density wave oscillations. Flashing instability in the chimney section of the test loop and density wave oscillation are the main flow instabilities observed when the system pressure is below 0.5 MPa. They show completely different type of oscillations, i.e., intermittent oscillation and sinusoidal oscillation, in void fraction profile during the startup transients. In order to perform nuclear-coupled startup transients with void reactivity feedback, the Point Kinetics model is utilized to calculate the transient power during the startup transients. In addition, the differences between the electric resistance heaters and typical fuel element are taken into account. The reactor power calculated shows some oscillations due to flashing instability during the transients. However, the void reactivity feedback does not have significant influence on the flow instability during the startup procedure for the NMR-50. Further investigation of very small power ramp on the startup transients is carried out for the thermal-hydraulic startup transients. It is found that very small power density can eliminate the flashing oscillation in the single phase natural circulation and stabilize the flow oscillations in the phase of net vapor generation. Furthermore, initially pressurized startup procedure is investigated to eliminate the main flow instabilities. The results show that the pressurized startup procedure can suppress the flashing instability at low pressure and low power conditions. In order to have a deep understanding of natural circulation flow instability, the quasi-steady tests are performed using the test facility installed with preheater and subcooler. The effects of system pressure, core inlet subcooling, core power density, inlet flow resistance coefficient, and void reactivity feedback are investigated in the quasi-steady state tests. The stability boundaries are determined between unstable and stable flow conditions in the dimensionless stability plane of inlet subcooling number and Zuber number. In order to predict the stability boundary theoretically, linear stability analysis in the frequency domain is performed at four sections of the loop. The flashing in the chimney is considered as an axially uniform heat source. The dimensionless characteristic equation of the pressure drop perturbation is obtained by considering the void fraction effect and outlet flow resistance in the chimney section. The flashing boundary shows some discrepancies with previous experimental data from the quasi-steady state tests. In the future, thermal non-equilibrium is recommended to improve the accuracy of flashing instability boundary.

  14. Success and Failure in University-Based Startups

    NASA Astrophysics Data System (ADS)

    Dehn, J.; Webley, P.; Cunningham, K. W.

    2014-12-01

    Adapting from a traditional government-funded research program to supporting the work through a start-up company is a difficult (and often not successful) transition. This is made more challenging in that with the relative decline in federal funding for the sciences the transition is forced on many researchers as a matter of survival. The business model of traditional research is not that different from that of the private sector; the development of an idea, models or mock-ups of the product, pitching to sources of funding, creating and marketing the product. However they differ significantly in the environment in which they are applied, as well as in the life span of a project or product. The environments for pitching an idea and gaining investment are very different in academia from that of the private sector, and most academics are stymied by the new approach. In addition, many universities labor under the illusion that start-ups will be a windfall, when in reality they represent a long term investment that will not pay out for many years. This extended timeline is also something new to academics, though persistence pays and a project may take years to fund, after it is complete and the publications written, many in the geosciences go on to new ideas. If a business is to be successful it must continue with a product long term, and develop new ideas around it. A hopefully successful balance of these approaches is being tried at the University of Alaska Fairbanks, where start-ups can build upon university intellectual property and use university resources to build a successful business. In turn the business supports research and development, primarily through faculty, staff and students at the university.

  15. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... compliance date shall be 18 months after September 8, 1994. (b) For new IPCT's that have an initial startup... initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  16. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... compliance date shall be 18 months after September 8, 1994. (b) For new IPCT's that have an initial startup... initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  17. Policy implications of startup utilization by enrollees in prepaid group plans.

    PubMed

    Baloff, N; Griffith, M J

    1984-04-01

    This article discusses several policy implications of the so-called startup effect, in which high initial health services utilization by new enrollees in prepaid group plans ( PGPs ) becomes reduced with the increasing duration of membership. Results of research in a developing PGP are analyzed as they relate to a mathematical model of startups for two measures of enrollee use. After estimating the total costs of startups in this setting, the motivating effects of such costs on PGPs are examined in relation to several policy issues--including the rate of PGP development in the United States, the use of financial incentives to enroll the elderly and medically disadvantaged, potential inequities of premium determination, the large impact of startups on disenrollment , and the federally mandated process of annual announcement of benefits and open enrollment. Ideas and mechanisms for future study on the startup effect and its policy implications are discussed.

  18. Policy implications of startup utilization by enrollees in prepaid group plans.

    PubMed Central

    Baloff, N; Griffith, M J

    1984-01-01

    This article discusses several policy implications of the so-called startup effect, in which high initial health services utilization by new enrollees in prepaid group plans ( PGPs ) becomes reduced with the increasing duration of membership. Results of research in a developing PGP are analyzed as they relate to a mathematical model of startups for two measures of enrollee use. After estimating the total costs of startups in this setting, the motivating effects of such costs on PGPs are examined in relation to several policy issues--including the rate of PGP development in the United States, the use of financial incentives to enroll the elderly and medically disadvantaged, potential inequities of premium determination, the large impact of startups on disenrollment , and the federally mandated process of annual announcement of benefits and open enrollment. Ideas and mechanisms for future study on the startup effect and its policy implications are discussed. PMID:6724954

  19. Startup analysis for a high temperature gas loaded heat pipe

    NASA Technical Reports Server (NTRS)

    Sockol, P. M.

    1973-01-01

    A model for the rapid startup of a high-temperature gas-loaded heat pipe is presented. A two-dimensional diffusion analysis is used to determine the rate of energy transport by the vapor between the hot and cold zones of the pipe. The vapor transport rate is then incorporated in a simple thermal model of the startup of a radiation-cooled heat pipe. Numerical results for an argon-lithium system show that radial diffusion to the cold wall can produce large vapor flow rates during a rapid startup. The results also show that startup is not initiated until the vapor pressure p sub v in the hot zone reaches a precise value proportional to the initial gas pressure p sub i. Through proper choice of p sub i, startup can be delayed until p sub v is large enough to support a heat-transfer rate sufficient to overcome a thermal load on the heat pipe.

  20. The physics of tokamak start-up

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mueller, D.

    Tokamak start-up on present-day devices usually relies on inductively induced voltage from a central solenoid. In some cases, inductive startup is assisted with auxiliary power from electron cyclotron radio frequency heating. International Thermonuclear Experimental Reactor, the National Spherical Torus Experiment Upgrade and JT60, now under construction, will make use of the understanding gained from present-day devices to ensure successful start-up. Design of a spherical tokamak (ST) with DT capability for nuclear component testing would require an alternative to a central solenoid because the small central column in an ST has insufficient space to provide shielding for the insulators in themore » solenoid. Alternative start-up techniques such as induction using outer poloidal field coils, electron Bernstein wave start-up, coaxial helicity injection, and point source helicity injection have been used with success, but require demonstration of scaling to higher plasma current.« less

  1. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial startup before September 8, 1994, the compliance date shall be September 8, 1994. (c) For new IPCT's that have an initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  2. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initial startup before September 8, 1994, the compliance date shall be September 8, 1994. (c) For new IPCT's that have an initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  3. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial startup before September 8, 1994, the compliance date shall be September 8, 1994. (c) For new IPCT's that have an initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  4. 75 FR 3911 - Advisory Board on Radiation and Worker Health (ABRWH or Advisory Board), National Institute for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ...: The Advisory Board was established under the Energy Employees Occupational Illness Compensation... employees at any Department of Energy facility who were exposed to radiation but for whom it is not feasible... Labor (DOL) Program Update; Department of Energy (DOE) Program Update; OCAS Science Update; Special...

  5. ARS NP212 Climate change, soils and emissions program update

    USDA-ARS?s Scientific Manuscript database

    The Agricultural Research Service National Program 212 (Climate Change, Soils, and Emissions) has a significant component focused on air quality studies. Presented here for the Agricultural Air Quality Task Force is an update on the status of ARS programs with focus on air quality. National Program ...

  6. Comparison of international guideline programs to evaluate and update the Dutch program for clinical guideline development in physical therapy

    PubMed Central

    Van der Wees, Philip J; Hendriks, Erik JM; Custers, Jan WH; Burgers, Jako S; Dekker, Joost; de Bie, Rob A

    2007-01-01

    Background Clinical guidelines are considered important instruments to improve quality in health care. Since 1998 the Royal Dutch Society for Physical Therapy (KNGF) produced evidence-based clinical guidelines, based on a standardized program. New developments in the field of guideline research raised the need to evaluate and update the KNGF guideline program. Purpose of this study is to compare different guideline development programs and review the KNGF guideline program for physical therapy in the Netherlands, in order to update the program. Method Six international guideline development programs were selected, and the 23 criteria of the AGREE Instrument were used to evaluate the guideline programs. Information about the programs was retrieved from published handbooks of the organizations. Also, the Dutch program for guideline development in physical therapy was evaluated using the AGREE criteria. Further comparison the six guideline programs was carried out using the following elements of the guideline development processes: Structure and organization; Preparation and initiation; Development; Validation; Dissemination and implementation; Evaluation and update. Results Compliance with the AGREE criteria of the guideline programs was high. Four programs addressed 22 AGREE criteria, and two programs addressed 20 AGREE criteria. The previous Dutch program for guideline development in physical therapy lacked in compliance with the AGREE criteria, meeting only 13 criteria. Further comparison showed that all guideline programs perform systematic literature searches to identify the available evidence. Recommendations are formulated and graded, based on evidence and other relevant factors. It is not clear how decisions in the development process are made. In particular, the process of translating evidence into practice recommendations can be improved. Conclusion As a result of international developments and consensus, the described processes for developing clinical practice guidelines have much in common. The AGREE criteria are common basis for the development of guidelines, although it is not clear how final decisions are made. Detailed comparison of the different guideline programs was used for updating the Dutch program. As a result the updated KNGF program complied with 22 AGREE criteria. International discussion is continuing and will be used for further improvement of the program. PMID:18036215

  7. Comparison of international guideline programs to evaluate and update the Dutch program for clinical guideline development in physical therapy.

    PubMed

    Van der Wees, Philip J; Hendriks, Erik J M; Custers, Jan W H; Burgers, Jako S; Dekker, Joost; de Bie, Rob A

    2007-11-23

    Clinical guidelines are considered important instruments to improve quality in health care. Since 1998 the Royal Dutch Society for Physical Therapy (KNGF) produced evidence-based clinical guidelines, based on a standardized program. New developments in the field of guideline research raised the need to evaluate and update the KNGF guideline program. Purpose of this study is to compare different guideline development programs and review the KNGF guideline program for physical therapy in the Netherlands, in order to update the program. Six international guideline development programs were selected, and the 23 criteria of the AGREE Instrument were used to evaluate the guideline programs. Information about the programs was retrieved from published handbooks of the organizations. Also, the Dutch program for guideline development in physical therapy was evaluated using the AGREE criteria. Further comparison the six guideline programs was carried out using the following elements of the guideline development processes: Structure and organization; Preparation and initiation; Development; Validation; Dissemination and implementation; Evaluation and update. Compliance with the AGREE criteria of the guideline programs was high. Four programs addressed 22 AGREE criteria, and two programs addressed 20 AGREE criteria. The previous Dutch program for guideline development in physical therapy lacked in compliance with the AGREE criteria, meeting only 13 criteria. Further comparison showed that all guideline programs perform systematic literature searches to identify the available evidence. Recommendations are formulated and graded, based on evidence and other relevant factors. It is not clear how decisions in the development process are made. In particular, the process of translating evidence into practice recommendations can be improved. As a result of international developments and consensus, the described processes for developing clinical practice guidelines have much in common. The AGREE criteria are common basis for the development of guidelines, although it is not clear how final decisions are made. Detailed comparison of the different guideline programs was used for updating the Dutch program. As a result the updated KNGF program complied with 22 AGREE criteria. International discussion is continuing and will be used for further improvement of the program.

  8. Business Angels - A Subspecies of the homo oeconomicus ludens.

    PubMed

    Hüsler, Laurenz; Platzer, Erich M

    2014-12-01

    Business Angels invest in start-up companies in their early stage. This type of investor usually has a good knowledge of the start-up's industry sector, and in addition to the funds he invests, his management experience and his network can be useful for start-ups. Business Angel involvement has shown to improve the success rate and the profitability of start-ups. The article depicts the relationship between entrepreneurs and Business Angels in four case examples.

  9. Improving startup graphs of nonunitized turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trukhnii, A.D.; Shreder, K.; Kochetov, A.A.

    1981-12-01

    The existing startup instructions for nonunitized steam turbines in a number of cases are not optimum from the standpoint of low-cycle fatigue. Lengthening the period of acceleration, holding at idle and loading not only lead to significant startup losses of fuel, but also reduce the low-cycle strength of the rotor. Eliminating these drawbacks within the scope of ordinary technology for startup and in the absence of other factors not associated with low-cycle fatigue will enable us to reduce by more than a factor of two the length of startups from the cold and noncold states and in so doing increasemore » low-cycle lifetime by a factor of 1.5-2. The use of steam with low parameters from a collector is effective at low initial rotor temperatures, in particular, during startups from the cold state. For this case it is possible to increase low-cycle lifetime by almost a factor of 3 by limiting the total startup time by one hour. The use of steam with varying temperatures essentially solved the problem of low-cycle lifetime of a rotor during startups from all heat states, especially from the noncold and hot states. Increasing the radius of curvature of the heat channel during modernization or major overhaul of a turbine will enable us to increase its low-cycle lifetime by a factor of 2-4.« less

  10. 40 CFR 63.9610 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section at all times, except during periods of startup, shutdown, and malfunction. The terms startup... develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). [68...

  11. Sonic limitations and startup problems of heat pipes

    NASA Technical Reports Server (NTRS)

    Deverall, J. E.; Kemme, J. E.; Florschuetz, L. W.

    1972-01-01

    Introduction of small amounts of inert, noncombustible gas aids startup in certain types of heat pipes. When the heat pipe is closely coupled to the heat sink, the startup system must be designed to bring the heat sink on-line slowly.

  12. Lessons Learned in Student Venture Creation

    NASA Astrophysics Data System (ADS)

    Caner, Edward

    The Physics Entrepreneurship Master's Program (PEP) at Case Western Reserve University is now in its 15th year of operation. PEP is a 27 credit-hour Master of Science in Physics, Entrepreneurship Track. The curriculum can be tailored to the needs of each student. Coursework consists of graduate-level classes in science, business, intellectual property law, and innovation. A master's thesis is required that is based on a real-world project in innovation or entrepreneurship within an existing company or startup (possibly the student's). PEP faculty help students connect with mentors, advisors, partners, funding sources and job opportunities. In this talk I will chronicle several pitfalls that we have encountered with our ''real world'' student projects and start-up businesses, several of which met their complete demise despite showing great promise for success. I will discuss how we have learned to avoid most of these pitfalls by taking surprisingly simple actions.

  13. 75 FR 30386 - Sunshine Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... updates on Voting System Testing and Certification programs, including UOCAVA Pilot Program Voting Systems... Voting Systems Threat Analysis. The Board will receive updates on research and studies, including draft...

  14. Steps to Starting a Small Business. Student Notebook.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Madison. Vocational Studies Center.

    This student notebook provides student materials for a program of study made up of a series of community-based activities potentially leading to the start-up of one's own business, while at the same time providing a better understanding of the American economic system of free enterprise. It begins with a glossary. For each of 15 units (1 more unit…

  15. Air Revitalization System Enables Excursions to the Stratosphere

    NASA Technical Reports Server (NTRS)

    2015-01-01

    Paragon Space Development Corporation, based in Tucson, Arizona has had a long history of collaboration with NASA, including developing a modular air purification system under the Commercial Crew Development Program, designed to support the commercial space sector. Using that device and other NASA technology, startup company World View is now gearing up to take customers on helium balloon rides to the stratosphere.

  16. Do/Will You Remember? Taking a Child Care Program's Past into the Future.

    ERIC Educational Resources Information Center

    Ranck, Edna Runnels

    1995-01-01

    Gives basic information about establishing an archive in a limited amount of space and accommodating some special materials. Discusses why a day care center or similar facility should bother to keep such records. Outlines start-up and maintenance tasks and includes a useful table of types of archival documents and artifacts in child care centers.…

  17. The Savannah River and its environs: Proceedings of a symposium in honor of Dr. Ruth Patrick for 35 years of studies on the Savannah River

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-12-01

    The symposium was focussed on the interrelationships of Savannah River Plant operations and the environment of the Savannah River area. Environmental programs at the Savannah River Plant site began with baseline measurements before plant startup and continued with data collection into the 1980's. (ACR)

  18. 76 FR 30925 - Information Collection; Submission for OMB Review, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    .../startup): None. Total Burden Cost (operating/maintenance): None. Instrument: Application and Budget.../startup): None. Total Burden Cost (operating/maintenance): None. AmeriCorps\\*\\VISTA Project Progress...,800 hours. Total Burden Cost (capital/startup): None. Total Burden Cost (operating/maintenance): None...

  19. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  20. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  1. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  2. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  3. 40 CFR 63.1354 - Reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup, shutdown, and... report. Reports shall only be required if a startup, shutdown, or malfunction occurred during the...

  4. Constellation Program Update

    NASA Image and Video Library

    2006-06-04

    Jeff Hanley, Constellation Program Manager, right, listens to a question during a NASA Update outlining responsibilities of the NASA centers associated with the Constellation Program for robotic and human Moon and Mars exploration on Wednesday, June 5, 2006, at NASA Headquarters in Washington. Photo Credit: (NASA/Bill Ingalls)

  5. 76 FR 9502 - Medicare Program; Home Health Prospective Payment System Rate Update for Calendar Year 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... [CMS-1510-F2] RIN 0938-AP88 Medicare Program; Home Health Prospective Payment System Rate Update for Calendar Year 2011; Changes in Certification Requirements for Home Health Agencies and Hospices; Correction... set forth an update to the Home Health Prospective Payment System (HH PPS) rates, including: The...

  6. 78 FR 27242 - Updated Special Advisory Bulletin on the Effect of Exclusion From Participation in Federal Health...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ...] Updated Special Advisory Bulletin on the Effect of Exclusion From Participation in Federal Health Care... health care programs by OIG. The updated Special Advisory Bulletin describes the scope and effect of the legal prohibition on payment by Federal health care programs for items or services furnished (1) by an...

  7. University Start-ups: A Better Business Model

    NASA Astrophysics Data System (ADS)

    Dehn, J.; Webley, P. W.

    2015-12-01

    Many universities look to start-up companies as a way to attract faculty, supporting research and students as traditional federal sources become harder to come by. University affiliated start-up companies can apply for a broader suite of grants, as well as market their services to a broad customer base. Often university administrators see this as a potential panacea, but national statistics show this is not the case. Rarely do universities profit significantly from their start-ups. With a success rates of around 20%, most start-ups end up costing the university money as well as faculty-time. For the faculty, assuming they want to continue in academia, a start-up is often unattractive because it commonly leads out of academia. Running a successful business as well as maintaining a strong teaching and research load is almost impossible to do at the same time. Most business models and business professionals work outside of academia, and the models taught in business schools do not merge well in a university environment. To mitigate this a new business model is proposed where university start-ups are aligned with the academic and research missions of the university. A university start-up must work within the university, directly support research and students, and the work done maintaining the business be recognized as part of the faculty member's university obligations. This requires a complex conflict of interest management plan and for the companies to be non-profit in order to not jeopardize the university's status. This approach may not work well for all universities, but would be ideal for many to conserve resources and ensure a harmonious relationship with their start-ups and faculty.

  8. A novel transient wall heat transfer approach for the start-up of SI engines with gasoline direct injection

    NASA Astrophysics Data System (ADS)

    Lejsek, David; Kulzer, André; Hammer, Jürgen

    2010-11-01

    The introduction of CO2-reduction technologies like Start-Stop or the Hybrid-Powertrain and the worldwide stringent emission legislation require a detailed optimization of the engine start-up. The combustion concept development as well as the calibration of the engine control unit makes an explicit thermodynamic analysis of the combustion process during the start-up necessary. Initially, the well-known thermodynamic analysis of in-cylinder pressure at stationary condition was transmitted to the highly non-stationary engine start-up. For this running mode of the engine the current models for calculation of the transient wall heat fluxes were found to be misleading. With a fraction of nearly 45% of the burned fuel energy, the wall heat is very important for the calculation of energy balance and for the combustion process analysis. Based on the measurements of transient wall heat transfer densities during the start-up presented in a former work (Lejsek and Kulzer in Investigations on the transient wall heat transfer at start-up for SI engines with gasoline direct injection. SAE Paper), the paper describes the development of adaptations to the known correlations by Woschni (MTZ 31:491, 1970), Hohenberg (Experimentelle Erfassung der Wandwärme von Kolbenmotoren. TU Graz, Habil., 1980) and Bargende (Ein Gleichungsansatz zur Berechnung der instationären Wandwärmeverluste im Hochdruckteil von Ottomotoren. TH Darmstadt, PhD-Thesis, 1991) for the application during engine start-up. To demonstrate the high accuracy of the model, the results of the cyclic resolved thermodynamic analysis using the presented novel approaches were compared with the results of the measurements. It is shown, that the novel heat flux models for the engine start-up process gives a cyclic resolved thermodynamic analysis to optimize the engine start-up pretty efficient.

  9. Using the Wilderness to Facilitate Adjustment to College: An Updated Description of Wilderness Orientation Programs.

    ERIC Educational Resources Information Center

    Davis-Berman, Jennifer; Berman, Dene

    1996-01-01

    Updated description of 38 wilderness orientation programs currently affiliated with U.S. colleges and universities includes program enrollment, length, cost, types of leaders, training, and sponsorship. Discusses program philosophies, goals, reasons for using the wilderness, and critical and emerging issues. Compares data to previous research.…

  10. 77 FR 58359 - TRICARE, Formerly Known as the Civilian Health and Medical Program of the Uniformed Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Medical Program of the Uniformed Services; Calendar Year 2013 TRICARE Young Adult Program Premium Update... Young Adult Premiums for Calendar Year 2013. SUMMARY: This notice provides the updated TRICARE Young... to implement the TRICARE Young Adult (TYA) program as required by Title 10, United States Code...

  11. A single center analysis of factors influencing study start-up timeline in clinical trials.

    PubMed

    Krafcik, Brianna M; Doros, Gheorghe; Malikova, Marina A

    2017-11-01

    Efficient start-up phase in clinical trials is crucial to execution. The goal was to determine factors contributing to delays. The start-up milestones were assessed for 38 studies and analyzed. Total start-up time was shorter for following studies: device trials, no outsourcing, fewer ancillary services used and in interventional versus observational designs. The use of a centralized Institutional Review Board (IRB) versus a local IRB reduced time to approval. Studies that never enrolled took longer on average to finalize their budget/contract, and obtain IRB than ones that did enroll. Different features of clinical trials can affect timeline of start-up process. An understanding of the impact of each feature allows for optimization.

  12. 40 CFR 63.1354 - Reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... owner or operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup... information in a semiannual report. Reports shall only be required if a startup, shutdown, or malfunction...

  13. 40 CFR 52.1183 - Visibility protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... excess emissions that occurs during startups, shutdowns, and malfunctions of the unit, the nature and... that occurs during startups, shutdowns, and malfunctions of the unit, the nature and cause of any... startup, shutdown, and malfunction. (viii) All CEMS required by this section must meet the minimum data...

  14. Start-Up of an Anaerobic Dynamic Membrane Digester for Waste Activated Sludge Digestion: Temporal Variations in Microbial Communities

    PubMed Central

    Yu, Hongguang; Wang, Qiaoying; Wang, Zhiwei; Sahinkaya, Erkan; Li, Yongli; Ma, Jinxing; Wu, Zhichao

    2014-01-01

    An anaerobic dynamic membrane digester (ADMD) was developed to digest waste sludge, and pyrosequencing was used to analyze the variations of the bacterial and archaeal communities during the start-up. Results showed that bacterial community richness decreased and then increased over time, while bacterial diversity remained almost the same during the start-up. Proteobacteria and Bacteroidetes were the major phyla. At the class level, Betaproteobacteria was the most abundant at the end of start-up, followed by Sphingobacteria. In the archaeal community, richness and diversity peaked at the end of the start-up stage. Principle component and cluster analyses demonstrated that archaeal consortia experienced a distinct shift and became stable after day 38. Methanomicrobiales and Methanosarcinales were the two predominant orders. Further investigations indicated that Methanolinea and Methanosaeta were responsible for methane production in the ADMD system. Hydrogenotrophic pathways might prevail over acetoclastic means for methanogenesis during the start-up, supported by specific methanogenic activity tests. PMID:24695488

  15. Optimization of Passive Voltage Multipliers for Fast Start-up and Multi-voltage Power Supplies in Electromagnetic Energy Harvesting Systems

    NASA Astrophysics Data System (ADS)

    Yang, G.; Stark, B. H.; Burrow, S. G.; Hollis, S. J.

    2014-11-01

    This paper demonstrates the use of passive voltage multipliers for rapid start-up of sub-milliwatt electromagnetic energy harvesting systems. The work describes circuit optimization to make as short as possible the transition from completely depleted energy storage to the first powering-up of an actively controlled switched-mode converter. The dependency of the start-up time on component parameters and topologies is derived by simulation and experimentation. The resulting optimized multiplier design reduces the start-up time from several minutes to 1 second. An additional improvement uses the inherent cascade structure of the voltage multiplier to power sub-systems at different voltages. This multi-rail start-up is shown to reduce the circuit losses of the active converter by 72% with respect to the optimized single-rail system. The experimental results provide insight into the multiplier's transient behaviour, including circuit interactions, in a complete harvesting system, and offer important information to optimize voltage multipliers for rapid start-up.

  16. Computer Program and User Documentation Medical Data Update System

    NASA Technical Reports Server (NTRS)

    Anderson, J.

    1971-01-01

    The update system for the NASA medical data minicomputer storage and retrieval system is described. The discussion includes general and technical specifications, a subroutine list, and programming instructions.

  17. ACON: a multipurpose production controller for plasma physics codes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snell, C.

    1983-01-01

    ACON is a BCON controller designed to run large production codes on the CTSS Cray-1 or the LTSS 7600 computers. ACON can also be operated interactively, with input from the user's terminal. The controller can run one code or a sequence of up to ten codes during the same job. Options are available to get and save Mass storage files, to perform Historian file updating operations, to compile and load source files, and to send out print and film files. Special features include ability to retry after Mass failures, backup options for saving files, startup messages for the various codes,more » and ability to reserve specified amounts of computer time after successive code runs. ACON's flexibility and power make it useful for running a number of different production codes.« less

  18. User's guide to the MESOI diffusion model and to the utility programs UPDATE and LOGRVU

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Athey, G.F.; Allwine, K.J.; Ramsdell, J.V.

    MESOI is an interactive, Lagrangian puff trajectory diffusion model. The model is documented separately (Ramsdell and Athey, 1981); this report is intended to provide MESOI users with the information needed to successfully conduct model simulations. The user is also provided with guidance in the use of the data file maintenance and review programs; UPDATE and LOGRVU. Complete examples are given for the operaton of all three programs and an appendix documents UPDATE and LOGRVU.

  19. Emission characteristics and vapour/particulate phase distributions of PCDD/F in a hazardous waste incinerator under transient conditions

    PubMed Central

    Wang, Chao; Cen, Kefa; Ni, Mingjiang; Li, Xiaodong

    2018-01-01

    Polychlorinated dibenzo-p-dioxin and polychlorinated dibenzofuran (PCDD/F) emission characteristics and vapour/particulate phase partitions under three continued operation conditions, i.e. shut-down, start-up and after start-up, were investigated by sampling stack gas. The results indicated that the PCDD/F emission levels were 0.40–18.03 ng I-TEQ Nm−3, much higher than the annual monitoring level (0.016 ng I-TEQ Nm−3). Additionally, the PCDD/F emission levels in start-up were higher than the other two conditions. Furthermore, the PCDD/F congener profiles differed markedly between shut-down and start-up, and the chlorination degree of PCDD/F increased in shut-down and decreased evidently in start-up. Moreover, PCDD/F vapour/particulate phase distributions varied significantly under three transient conditions. The PCDD/F vapour phase proportion decreased as the shut-down process continued, then increased as the start-up process proceeded, finally more than 98% of the PCDD/F congeners were distributed in the vapour phase after start-up. The correlations between log(Cv/Cs) versus log pL0 of each PCDD/F congener in stack gas were disorganized in shut-down, and trend to a linear distribution after start-up. Besides, polychlorinated biphenyl emissions show behaviour similar to that of PCDD/F, and the lower chlorinated congeners have a stronger relationship with 2,3,7,8-PCDD/Fs, such as M1CB and D2CB. PMID:29410821

  20. Characteristics of dioxin emissions at startup and shutdown of MSW incinerators.

    PubMed

    Tejima, Hajime; Nishigaki, Masahide; Fujita, Yasuyuki; Matsumoto, Akihiro; Takeda, Nobuo; Takaoka, Masaki

    2007-01-01

    Dioxin concentrations from municipal waste incinerators in Japan and elsewhere often show low concentrations that comply with legal limits (in this paper, the term "dioxin" designates WHO-TEQ: PCDD/Fs+dioxin-like PCB). However, such data is usually generated under normal steady state operational conditions, and there has been little investigation of releases occurring during startup and shutdown. It is important, therefore, to ascertain quantitatively emissions in an unsteady state (startup and shutdown) in order to correctly evaluate the relationship between emissions from a facility and the surrounding environment. The present study aimed to examine dioxin emissions of a continuously operated incinerator at startup and shutdown, and estimating the time period of greatest emission, and the processes causing dioxin generation. The startup process was divided into five stages and the shutdown into two; at each stage, dioxins in the flue gas were measured at the boiler outlet and the stack. From the concentration of dioxins and the flue gas volume at each stage, the amount of dioxins at startup and shutdown were calculated, and these were compared with that under steady state conditions. Dioxin concentration at the stack under steady state conditions was a very low level, while those at startup and shutdown were higher. In the case where dioxin concentration under a steady state is a low level like in this study, it is indicated that the total annual dioxin emission from a facility could be attributed to the startup periods.

  1. Synthesizing information-update functions using off-line symbolic processing

    NASA Technical Reports Server (NTRS)

    Rosenschein, Stanley J.

    1990-01-01

    This paper explores the synthesis of programs that track dynamic conditions in their environment. An approach is proposed in which the designer specifies, in a declarative language, aspects of the environment in which the program will be embedded. This specification is then automatically compiled into a program that, when executed, updates internal data structures so as to maintain as an invariant a desired correspondence between internal data structures and states of the external environment. This approach retains much of the flexibility of declarative programming while guaranteeing a hard bound on the execution time of information-update functions.

  2. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  3. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  4. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  5. 40 CFR 63.1164 - Reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...

  6. 40 CFR 63.1164 - Reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...

  7. 40 CFR 63.1164 - Reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...

  8. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  9. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  10. Southern California Regional Technology Acceleration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ochoa, Rosibel; Rasochova, Lada

    2014-09-30

    UC San Diego and San Diego State University are partnering to address these deficiencies in the renewable energy space in the greater San Diego region, accelerating the movement of clean energy innovation from the university laboratory into the marketplace, building on the proven model of the William J. von Liebig Center’s (vLC’s) Proof of Concept (POC) program and virtualizing the effort to enable a more inclusive environment for energy innovation and expansion of the number of clean energy start-ups and/or technology licenses in greater California.

  11. 77 FR 67449 - Medicare Program; End-Stage Renal Disease Prospective Payment System, Quality Incentive Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Blended Payment a. Update to the Drug Add-on to the Composite Rate Portion of the ESRD Blended Payment Rate i. Estimating Growth in Expenditures for Drugs and Biologicals in CY 2013 ii. Estimating Per Patient Growth iii. Applying the Growth Update to the Drug Add-On Adjustment iv. Update to the Drug Add-On...

  12. Updating the Economic Impacts of the High/Scope Perry Preschool Program

    ERIC Educational Resources Information Center

    Nores, Milagros; Belfield, Clive R.; Barnett, W. Steven; Schweinhart, Lawrence

    2005-01-01

    This article derives an updated cost-benefit ratio for the High/Scope Perry Preschool Program, an intensive preschool intervention delivered during the 1960s to at-risk children in Ypsilanti, Michigan. Because children were randomly assigned to the program or a control group, differences in outcomes are probably attributable to program status.…

  13. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  14. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  15. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  16. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  17. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  18. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  19. 40 CFR 63.2860 - What notifications must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (2) The notification of actual startup date must also include whether you have elected to operate under an initial startup period subject to § 63.2850(c)(2) and provide an estimate and justification for the anticipated duration of the initial startup period. (c) Significant modification notifications...

  20. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  1. 40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information... requirements for annual reporting in § 63.6010(f). 2. Immediate startup, shutdown, and malfunction report if...

  2. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that commenced construction before or on March 24, 1998, or (2) June 14, 1999 or startup for sources..., or (2) Startup for sources that commenced construction after December 20, 2006. (c) The compliance... September 9, 2013. (d) The compliance date for new sources is November 9, 2010 or startup, whichever is...

  3. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that commenced construction before or on March 24, 1998, or (2) June 14, 1999 or startup for sources..., or (2) Startup for sources that commenced construction after December 20, 2006. (c) The compliance... September 9, 2013. (d) The compliance date for new sources is November 9, 2010 or startup, whichever is...

  4. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  5. 78 FR 20855 - State Implementation Plans: Response to Petition for Rulemaking; Findings of Substantial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... SIP Calls To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... SIP Calls to Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction...

  6. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  7. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  8. 40 CFR 63.2860 - What notifications must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (2) The notification of actual startup date must also include whether you have elected to operate under an initial startup period subject to § 63.2850(c)(2) and provide an estimate and justification for the anticipated duration of the initial startup period. (c) Significant modification notifications...

  9. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or startup for sources that commenced construction after March 24, 1998. (b) The compliance date for... before or on December 20, 2006, or (2) Startup for sources that commenced construction after December 20... compliance date for new sources is February 12, 2013, or startup, whichever is later. (e) The compliance date...

  10. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or startup for sources that commenced construction after March 24, 1998. (b) The compliance date for... before or on December 20, 2006, or (2) Startup for sources that commenced construction after December 20... compliance date for new sources is February 12, 2013, or startup, whichever is later. (e) The compliance date...

  11. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  12. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  13. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  14. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  15. 40 CFR 63.2860 - What notifications must I submit and when?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (2) The notification of actual startup date must also include whether you have elected to operate under an initial startup period subject to § 63.2850(c)(2) and provide an estimate and justification for the anticipated duration of the initial startup period. (c) Significant modification notifications...

  16. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  17. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  18. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  19. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  20. 40 CFR 65.48 - Reporting provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Storage Vessels § 65.48 Reporting provisions. (a) Notification of initial startup. If § 65.5(b) requires that a notification of initial startup be filed, then the content of the notification of initial startup shall at least include the information specified in § 65.5(b) and the...

  1. 40 CFR 63.366 - Reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of (initial) startup of the source. (8) The type and quantity of hazardous air pollutants emitted by.... New or reconstructed sources subject to these emissions standards with an initial startup date before... application shall be submitted as soon as practicable before the initial startup date but no later than 60...

  2. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  3. 40 CFR 65.48 - Reporting provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Storage Vessels § 65.48 Reporting provisions. (a) Notification of initial startup. If § 65.5(b) requires that a notification of initial startup be filed, then the content of the notification of initial startup shall at least include the information specified in § 65.5(b) and the...

  4. 26 CFR 1.860A-0 - Outline of REMIC provisions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... REMIC return. (1) In general. (2) REMIC whose startup day is before November 10, 1988. (i) In general. (ii) Startup day. (iii) Exception. (d) Designation of tax matters person. (e) Notice to holders of.... (4) Fixed terms on the startup day. (5) Contingencies prohibited. (b) Special rules for regular...

  5. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  6. 40 CFR 61.33 - Stack sampling.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... which has an initial startup date preceding February 27, 2014; or (2) Within 90 days of startup in the case of a new source which did not have an initial startup date preceding February 27, 2014. (b) The... relative frequency of operation of different types of processes, operating hours, operating capacities, or...

  7. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  8. 26 CFR 1.860A-0 - Outline of REMIC provisions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... REMIC return. (1) In general. (2) REMIC whose startup day is before November 10, 1988. (i) In general. (ii) Startup day. (iii) Exception. (d) Designation of tax matters person. (e) Notice to holders of.... (4) Fixed terms on the startup day. (5) Contingencies prohibited. (b) Special rules for regular...

  9. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  10. 40 CFR 63.1346 - Operating limits for kilns.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., is not exceeded, except during periods of startup and shutdown when the temperature limit may be... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by... periods of startup/shutdown when the temperature limit may be exceeded by no more than 10 percent. (b) The...

  11. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  12. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  13. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  14. 40 CFR 63.1346 - Operating limits for kilns.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by..., except during periods of startup/shutdown when the temperature limit may be exceeded by no more than 10... performance test, with or without the raw mill operating, is not exceeded, except during periods of startup...

  15. 40 CFR 65.48 - Reporting provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Storage Vessels § 65.48 Reporting provisions. (a) Notification of initial startup. If § 65.5(b) requires that a notification of initial startup be filed, then the content of the notification of initial startup shall at least include the information specified in § 65.5(b) and the...

  16. 40 CFR 63.1346 - Operating limits for kilns.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by..., except during periods of startup/shutdown when the temperature limit may be exceeded by no more than 10... performance test, with or without the raw mill operating, is not exceeded, except during periods of startup...

  17. 40 CFR 65.48 - Reporting provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Storage Vessels § 65.48 Reporting provisions. (a) Notification of initial startup. If § 65.5(b) requires that a notification of initial startup be filed, then the content of the notification of initial startup shall at least include the information specified in § 65.5(b) and the...

  18. 40 CFR 63.366 - Reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of (initial) startup of the source. (8) The type and quantity of hazardous air pollutants emitted by.... New or reconstructed sources subject to these emissions standards with an initial startup date before... application shall be submitted as soon as practicable before the initial startup date but no later than 60...

  19. 40 CFR 63.366 - Reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of (initial) startup of the source. (8) The type and quantity of hazardous air pollutants emitted by.... New or reconstructed sources subject to these emissions standards with an initial startup date before... application shall be submitted as soon as practicable before the initial startup date but no later than 60...

  20. 40 CFR 63.1346 - Operating limits for kilns.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., is not exceeded, except during periods of startup and shutdown when the temperature limit may be... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by... periods of startup/shutdown when the temperature limit may be exceeded by no more than 10 percent. (b) The...

  1. 40 CFR 63.366 - Reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of (initial) startup of the source. (8) The type and quantity of hazardous air pollutants emitted by.... New or reconstructed sources subject to these emissions standards with an initial startup date before... application shall be submitted as soon as practicable before the initial startup date but no later than 60...

  2. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  3. 40 CFR 65.48 - Reporting provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Storage Vessels § 65.48 Reporting provisions. (a) Notification of initial startup. If § 65.5(b) requires that a notification of initial startup be filed, then the content of the notification of initial startup shall at least include the information specified in § 65.5(b) and the...

  4. Startup of Pumping Units in Process Water Supplies with Cooling Towers at Thermal and Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berlin, V. V., E-mail: vberlin@rinet.ru; Murav’ev, O. A., E-mail: muraviov1954@mail.ru; Golubev, A. V., E-mail: electronik@inbox.ru

    Aspects of the startup of pumping units in the cooling and process water supply systems for thermal and nuclear power plants with cooling towers, the startup stages, and the limits imposed on the extreme parameters during transients are discussed.

  5. "Size Matters": Women in High Tech Start-Ups

    NASA Astrophysics Data System (ADS)

    Lackritz, Hilary

    2001-03-01

    For those who want constant excitement, change, and rapid opportunities to have an impact in the technical world, start-up companies offer wonderful challenges. This talk will focus realistically on rewards and risks in the start-up world. An outline of the differences between the high tech start-ups and the academic and consulting worlds from a personal viewpoint will be presented. Size usually does matter, and in this case, small size can equal independence, entrepreneurship, and other advantages that are hard to come by in Dilbert’s corporate world.

  6. Mathematical modeling and analysis of heat pipe start-up from the frozen state

    NASA Technical Reports Server (NTRS)

    Jang, Jong Hoon; Faghri, Amir; Chang, Won Soon; Mahefkey, Edward T.

    1989-01-01

    The start-up process of a frozen heat pipe is described and a complete mathematical model for the start-up of the frozen heat pipe is developed based on the existing experimental data, which is simplified and solved numerically. The two-dimensional transient model for the wall and wick is coupled with the one-dimensional transient model for the vapor flow when vaporization and condensation occur at the interface. A parametric study is performed to examine the effect of the boundary specification at the surface of the outer wall on the successful start-up from the frozen state. For successful start-up, the boundary specification at the outer wall surface must melt the working substance in the condenser before dry-out takes place in the evaporator.

  7. Mathematical modeling and analysis of heat pipe start-up from the frozen state

    NASA Technical Reports Server (NTRS)

    Jang, J. H.; Faghri, A.; Chang, W. S.; Mahefkey, E. T.

    1990-01-01

    The start-up process of a frozen heat pipe is described and a complete mathematical model for the start-up of the frozen heat pipe is developed based on the existing experimental data, which is simplified and solved numerically. The two-dimensional transient model for the wall and wick is coupled with the one-dimensional transient model for the vapor flow when vaporization and condensation occur at the interface. A parametric study is performed to examine the effect of the boundary specification at the surface of the outer wall on the successful start-up from the frozen state. For successful start-up, the boundary specification at the outer wall surface must melt the working substance in the condenser before dry-out takes place in the evaporator.

  8. Electrical start-up for diesel fuel processing in a fuel-cell-based auxiliary power unit

    NASA Astrophysics Data System (ADS)

    Samsun, Remzi Can; Krupp, Carsten; Tschauder, Andreas; Peters, Ralf; Stolten, Detlef

    2016-01-01

    As auxiliary power units in trucks and aircraft, fuel cell systems with a diesel and kerosene reforming capacity offer the dual benefit of reduced emissions and fuel consumption. In order to be commercially viable, these systems require a quick start-up time with low energy input. In pursuit of this end, this paper reports an electrical start-up strategy for diesel fuel processing. A transient computational fluid dynamics model is developed to optimize the start-up procedure of the fuel processor in the 28 kWth power class. The temperature trend observed in the experiments is reproducible to a high degree of accuracy using a dual-cell approach in ANSYS Fluent. Starting from a basic strategy, different options are considered for accelerating system start-up. The start-up time is reduced from 22 min in the basic case to 9.5 min, at an energy consumption of 0.4 kW h. Furthermore, an electrical wire is installed in the reformer to test the steam generation during start-up. The experimental results reveal that the generation of steam at 450 °C is possible within seconds after water addition to the reformer. As a result, the fuel processor can be started in autothermal reformer mode using the electrical concept developed in this work.

  9. Kennedy Space Center Director Update

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. An attendee talks with Trent Smith, program manager, and Tammy Belk, a program specialist, at the ISS Ground Processing and Research Office display. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper

  10. Advanced Fuels for LWRs: Fully-Ceramic Microencapsulated and Related Concepts FY 2012 Interim Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Sonat Sen; Brian Boer; John D. Bess

    2012-03-01

    This report summarizes the progress in the Deep Burn project at Idaho National Laboratory during the first half of fiscal year 2012 (FY2012). The current focus of this work is on Fully-Ceramic Microencapsulated (FCM) fuel containing low-enriched uranium (LEU) uranium nitride (UN) fuel kernels. UO2 fuel kernels have not been ruled out, and will be examined as later work in FY2012. Reactor physics calculations confirmed that the FCM fuel containing 500 mm diameter kernels of UN fuel has positive MTC with a conventional fuel pellet radius of 4.1 mm. The methodology was put into place and validated against MCNP tomore » perform whole-core calculations using DONJON, which can interpolate cross sections from a library generated using DRAGON. Comparisons to MCNP were performed on the whole core to confirm the accuracy of the DRAGON/DONJON schemes. A thermal fluid coupling scheme was also developed and implemented with DONJON. This is currently able to iterate between diffusion calculations and thermal fluid calculations in order to update fuel temperatures and cross sections in whole-core calculations. Now that the DRAGON/DONJON calculation capability is in place and has been validated against MCNP results, and a thermal-hydraulic capability has been implemented in the DONJON methodology, the work will proceed to more realistic reactor calculations. MTC calculations at the lattice level without the correct burnable poison are inadequate to guarantee zero or negative values in a realistic mode of operation. Using the DONJON calculation methodology described in this report, a startup core with enrichment zoning and burnable poisons will be designed. Larger fuel pins will be evaluated for their ability to (1) alleviate the problem of positive MTC and (2) increase reactivity-limited burnup. Once the critical boron concentration of the startup core is determined, MTC will be calculated to verify a non-positive value. If the value is positive, the design will be changed to require less soluble boron by, for example, increasing the reactivity hold-down by burnable poisons. Then, the whole core analysis will be repeated until an acceptable design is found. Calculations of departure from nucleate boiling ratio (DNBR) will be included in the safety evaluation as well. Once a startup core is shown to be viable, subsequent reloads will be simulated by shuffling fuel and introducing fresh fuel. The PASTA code has been updated with material properties of UN fuel from literature and a model for the diffusion and release of volatile fission products from the SiC matrix material . Preliminary simulations have been performed for both normal conditions and elevated temperatures. These results indicated that the fuel performs well and that the SiC matrix has a good retention of the fission products. The path forward for fuel performance work includes improvement of metallic fission product release from the kernel. Results should be considered preliminary and further validation is required.« less

  11. Design, Fabrication and Testing of Two Different Laboratory Prototypes of CSI-based Induction Heating Units

    NASA Astrophysics Data System (ADS)

    Roy, M.; Sengupta, M.

    2012-09-01

    Induction heating is a non-contact heating process which became popular due to its energy efficiency. Current source inverter (CSI) based induction heating units are commonly used in the industry. Most of these CSIs are thyristor based, since thyristors of higher ratings are easily available. These being load commutated apparatus a start-up circuit is needed to initiate commutation. In this paper the design and fabrication of two laboratory prototypes have been presented. The first one, a SCR-based CSI fed controlled induction heating unit (IHU), has been tested with two different types of start-up procedures. Thereafter the fabrication and performance of another IGBT-based CSI is compared with the thyristor-based CSI for a 2 kW, 10 kHz application. These two types of CSIs are fully fabricated in laboratory along with the IHU. Performance analysis and simulation of two different CSIs has been done by using SequelGUI2. The triggering pulses for the inverter devices (for both CSI devices as well as auxilliary thyristor of start-up circuit) have been generated and closed-loop control has been done in FPGA platform built around an Altera make cyclone EPIC12Q240C processor which can be programmed using Quartus II software. Close agreement between simulated and experimental results highlight the accuracy of the experimental work.

  12. Teaching Adaptability of Object-Oriented Programming Language Curriculum

    ERIC Educational Resources Information Center

    Zhu, Xiao-dong

    2012-01-01

    The evolution of object-oriented programming languages includes update of their own versions, update of development environments, and reform of new languages upon old languages. In this paper, the evolution analysis of object-oriented programming languages is presented in term of the characters and development. The notion of adaptive teaching upon…

  13. Program Description: EDIT Program and Vendor Master Update, SWRL Financial System.

    ERIC Educational Resources Information Center

    Ikeda, Masumi

    Computer routines to edit input data for the Southwest Regional Laboratory's (SWRL) Financial System are described. The program is responsible for validating input records, generating records for further system processing, and updating the Vendor Master File--a file containing the information necessary to support the accounts payable and…

  14. 78 FR 58291 - TRICARE; Fiscal Year 2014 Continued Health Care Benefit Program Premium Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE; Fiscal Year 2014 Continued Health Care... Health Care Benefit Program Premiums for Fiscal Year 2014. SUMMARY: This notice provides the updated Continued Health Care Benefit Program Premiums for Fiscal Year 2014. DATES: The Fiscal Year 2014 rates...

  15. The SKI-HI Program: A Descriptive Update, 1986.

    ERIC Educational Resources Information Center

    Bruce, Sandy; And Others

    This document provides updated information on the SKI-HI program model which presently serves over 2000 young hearing impaired children in 35 states and Canada. The program focuses on training parents in the skills needed to maximize language stimulation and minimize language deprivation. Among 14 educational and philosophical underpinnings of the…

  16. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION, CALIBRATION, AND MAINTENANCE OF THE PERKIN-ELMER 5100 PC ATOMIC ABSORPTION SPECTROMETER (BCO-L-5.1)

    EPA Science Inventory

    The purpose of this SOP is to outline the start-up, calibration, operation, and maintenance procedures for the Perkin-Elmer 5100 PC Atomic Absorption Spectrophotometer (PE 5100). These procedures are used for the determination of the target trace metal, as in soil, house dust, f...

  17. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION, CALIBRATION, AND MAINTENANCE OF THE PERKIN-ELMER ZEEMAN/5000 SYSTEM ATOMIC ABSORPTION SPECTROPHOTOMETER (BCO-L-6.0)

    EPA Science Inventory

    The purpose of this SOP is to outline the start-up, calibration, operation, and maintenance procedures for the Perkin-Elmer 5000 atomic absorption spectrophotometer (PE 5000 AA), and the Perkin Elmer 5000 Zeeman graphite furnace atomic absorption spectrophotometer (PE 5000Z GFAA)...

  18. Management approach recommendations. Earth Observatory Satellite system definition study (EOS)

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.

  19. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...

  20. Alternative Fuels Data Center: Maps and Data

    Science.gov Websites

    emissions comparison of heavy duty vehicles as captured by the Clean Cities Program. Last update February emissions comparison of light duty vehicles as captured by the Clean Cities Program. Last update February

  1. Alternative Fuels Data Center: Maps and Data

    Science.gov Websites

    gas emissions comparison of heavy duty vehicles as captured by the Clean Cities Program. Last update gas emissions comparison of light duty vehicles as captured by the Clean Cities Program. Last update

  2. Guidance system operations plan for manned LM earth orbital and lunar missions using program luminary 1E. Section 2: Data links

    NASA Technical Reports Server (NTRS)

    Hamilton, M. H.

    1972-01-01

    Data links for the guidance system of manned lunar module orbital and lunar missions are presented. Subjects discussed are: (1) digital uplink to lunar module, (2) lunar module liftoff time increment, (3) lunar module contiguous block update, (4) lunar module scatter update, (5) lunar module digital downlink, and (6) absolute addresses for update program.

  3. Navigating the Interface between Design Education and Fashion Business Start-up

    ERIC Educational Resources Information Center

    Mills, Colleen E.

    2012-01-01

    Purpose: The purpose of this paper is to address the interface between design education and business start-up in the designer fashion industry (DFI) and provide a new framework for reflecting on ways to improve design education and graduates' business start-up preparedness. Design/methodology/approach: This interpretive study employed…

  4. Help Wanted: Exploring the Value of Entrepreneurial Mentoring at Start-Up

    ERIC Educational Resources Information Center

    Brodie, Jacqueline; Van Saane, Sebastiaan Huib; Osowska, Renata

    2017-01-01

    The purpose of the research presented in this article was to investigate the added value of mentoring for entrepreneurs during the start-up phase. This small-scale exploratory research focused on five start-up entrepreneurs in Scotland to determine the entrepreneurs' perceptions regarding the "added" value of their mentoring support. To…

  5. 40 CFR 63.2233 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section, whichever is applicable. (1) If the initial startup of your affected source is before September... initial startup of your affected source is after September 28, 2004, then you must comply with the... in this subpart upon initial startup of your affected source. (b) If you have an existing affected...

  6. 40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown, and...

  7. 40 CFR 63.11401 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... July 16, 2007. (b) If you startup a new affected source on or before July 16, 2007, you must achieve compliance with the applicable provisions of this subpart not later than July 16, 2007. (c) If you startup a... this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  8. 40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reporting in § 63.6010(f). c. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report....6010(b), unless you meet the requirements for annual reporting in § 63.6010(f). 2. Immediate startup...

  9. 40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...

  10. 40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...

  11. 40 CFR 63.11408 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... subpart not later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your affected source. Standards and...

  12. 40 CFR 63.11401 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... July 16, 2007. (b) If you startup a new affected source on or before July 16, 2007, you must achieve compliance with the applicable provisions of this subpart not later than July 16, 2007. (c) If you startup a... this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  13. 40 CFR 63.11408 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... subpart not later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your affected source. Standards and...

  14. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  15. 40 CFR 63.11394 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... subpart no later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance...

  16. 40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...

  17. 40 CFR 63.11408 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... subpart not later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your affected source. Standards and...

  18. 40 CFR 63.11154 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Applicability and Compliance Dates § 63.11154 What are my compliance dates? (a) If you startup a new affected... subpart not later than January 23, 2007. (b) If you startup a new affected source after January 23, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your...

  19. 40 CFR 63.11408 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subpart not later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your affected source. Standards and...

  20. 40 CFR 63.2233 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section, whichever is applicable. (1) If the initial startup of your affected source is before September... initial startup of your affected source is after September 28, 2004, then you must comply with the... in this subpart upon initial startup of your affected source. (b) If you have an existing affected...

  1. 40 CFR 63.1191 - What notifications must I submit?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... becomes a major source. (2) A source that has an initial startup before the effective date of the standard. (3) A new or reconstructed source that has an initial startup after the effective date of the... major source or reconstruct a major source where the initial startup of the new or reconstructed source...

  2. 40 CFR 63.1570 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  3. 40 CFR 63.11154 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Applicability and Compliance Dates § 63.11154 What are my compliance dates? (a) If you startup a new affected... subpart not later than January 23, 2007. (b) If you startup a new affected source after January 23, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your...

  4. 40 CFR 63.2233 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... section, whichever is applicable. (1) If the initial startup of your affected source is before September... initial startup of your affected source is after September 28, 2004, then you must comply with the... in this subpart upon initial startup of your affected source. (b) If you have an existing affected...

  5. 40 CFR 63.11394 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subpart no later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance...

  6. 40 CFR 63.5555 - How do I demonstrate continuous compliance with the emission limits, operating limits, and work...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... startup, shutdown, and malfunction. These instances are deviations from the emission limits, operating... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period you identify as a startup, shutdown, or malfunction...

  7. 40 CFR 63.11394 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... subpart no later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance...

  8. 40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown, and...

  9. 40 CFR 63.11394 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... subpart no later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance...

  10. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  11. 40 CFR 63.9040 - How do I demonstrate continuous compliance with the emission limitations and work practice...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to you. This includes periods of startup, shutdown, and malfunction. These instances are deviations... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations...

  12. 40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...

  13. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  14. 40 CFR 63.11161 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... subpart by January 23, 2007. If you startup a new sintering machine at an existing affected source after... than 180 days after startup. (b) If you have a new affected source, you must achieve compliance with...) If you startup a new affected source on or before January 23, 2007, you must achieve compliance with...

  15. 40 CFR 63.11401 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... July 16, 2007. (b) If you startup a new affected source on or before July 16, 2007, you must achieve compliance with the applicable provisions of this subpart not later than July 16, 2007. (c) If you startup a... this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  16. 40 CFR 63.11161 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart by January 23, 2007. If you startup a new sintering machine at an existing affected source after... than 180 days after startup. (b) If you have a new affected source, you must achieve compliance with...) If you startup a new affected source on or before January 23, 2007, you must achieve compliance with...

  17. 40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reporting in § 63.6010(f). c. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report....6010(b), unless you meet the requirements for annual reporting in § 63.6010(f). 2. Immediate startup...

  18. 40 CFR 63.5555 - How do I demonstrate continuous compliance with the emission limits, operating limits, and work...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... startup, shutdown, and malfunction. These instances are deviations from the emission limits, operating... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period you identify as a startup, shutdown, or malfunction...

  19. 40 CFR 63.11429 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must achieve compliance with applicable provisions in this subpart by July 16, 2007. (b) If you startup... provisions in this subpart not later than July 16, 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with applicable provisions in this subpart upon initial startup...

  20. 40 CFR 63.1191 - What notifications must I submit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... becomes a major source. (2) A source that has an initial startup before the effective date of the standard. (3) A new or reconstructed source that has an initial startup after the effective date of the... major source or reconstruct a major source where the initial startup of the new or reconstructed source...

  1. 40 CFR 63.1570 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  2. 40 CFR 63.1570 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  3. 40 CFR 63.11401 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... July 16, 2007. (b) If you startup a new affected source on or before July 16, 2007, you must achieve compliance with the applicable provisions of this subpart not later than July 16, 2007. (c) If you startup a... this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  4. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  5. 40 CFR 63.11154 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Applicability and Compliance Dates § 63.11154 What are my compliance dates? (a) If you startup a new affected... subpart not later than January 23, 2007. (b) If you startup a new affected source after January 23, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your...

  6. 40 CFR 63.11154 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Applicability and Compliance Dates § 63.11154 What are my compliance dates? (a) If you startup a new affected... subpart not later than January 23, 2007. (b) If you startup a new affected source after January 23, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your...

  7. 40 CFR 63.11394 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart no later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance...

  8. 40 CFR 63.11429 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... must achieve compliance with applicable provisions in this subpart by July 16, 2007. (b) If you startup... provisions in this subpart not later than July 16, 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with applicable provisions in this subpart upon initial startup...

  9. 40 CFR 63.11161 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subpart by January 23, 2007. If you startup a new sintering machine at an existing affected source after... than 180 days after startup. (b) If you have a new affected source, you must achieve compliance with...) If you startup a new affected source on or before January 23, 2007, you must achieve compliance with...

  10. 40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...

  11. 40 CFR 63.2233 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section, whichever is applicable. (1) If the initial startup of your affected source is before September... initial startup of your affected source is after September 28, 2004, then you must comply with the... in this subpart upon initial startup of your affected source. (b) If you have an existing affected...

  12. 40 CFR 63.1570 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  13. 40 CFR 63.11429 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... must achieve compliance with applicable provisions in this subpart by July 16, 2007. (b) If you startup... provisions in this subpart not later than July 16, 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with applicable provisions in this subpart upon initial startup...

  14. 40 CFR 63.1191 - What notifications must I submit?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... becomes a major source. (2) A source that has an initial startup before the effective date of the standard. (3) A new or reconstructed source that has an initial startup after the effective date of the... major source or reconstruct a major source where the initial startup of the new or reconstructed source...

  15. 40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....6010(f). c. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include... you meet the requirements for annual reporting in § 63.6010(f). 2. Immediate startup, shutdown, and...

  16. 40 CFR 63.11429 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must achieve compliance with applicable provisions in this subpart by July 16, 2007. (b) If you startup... provisions in this subpart not later than July 16, 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with applicable provisions in this subpart upon initial startup...

  17. 40 CFR 63.11429 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must achieve compliance with applicable provisions in this subpart by July 16, 2007. (b) If you startup... provisions in this subpart not later than July 16, 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with applicable provisions in this subpart upon initial startup...

  18. 40 CFR 63.1570 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...

  19. 40 CFR 63.11408 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart not later than January 16, 2008. (b) If you startup a new affected source on or before July 16..., 2007. (c) If you startup a new affected source after July 16, 2007, you must achieve compliance with the applicable provisions of this subpart upon startup of your affected source. Standards and...

  20. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

Top