Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-30
... Wright Area Coal Final Environmental Impact Statement That Includes Four Federal Coal Lease- by... Statement (EIS) for the Wright Area Coal project that contains four Federal coal Lease-by-Applications (LBAs), and by this notice announces the availability of the Wright Area Coal Final EIS for review. DATES: To...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... infrastructure development, including siting wind turbines, access roads, underground collector lines, overhead... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-30
... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West..., and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
... Environmental Impact Statement (EIS) for the Navajo Nation Integrated Weed Management Plan Within Coconino...-year integrated weed management plan for the Navajo Indian Reservation. The Navajo Indian Reservation... integrated weed management plan include, but will not be limited to, mechanical, cultural, biological and...
Including Emotional Intelligence in Pharmacy Curricula to Help Achieve CAPE Outcomes
Fierke, Kerry K.; Sucher, Brandon J.; Janke, Kristin K.
2015-01-01
The importance of emotional intelligence (EI) for effective teamwork and leadership within the workplace is increasingly apparent. As suggested by the 2013 CAPE Outcomes, we recommend that colleges and schools of pharmacy consider EI-related competencies to build self-awareness and professionalism among students. In this Statement, we provide two examples of the introduction of EI into pharmacy curricula. In addition, we provide a 4-phase process based on recommendations developed by EI experts for structuring and planning EI development. Finally, we make 9 recommendations’ to inform the process of including EI in pharmacy curricula. PMID:26089557
33 CFR 230.13 - Environmental Impact Statement (EIS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Environmental Impact Statement..., DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA § 230.13 Environmental Impact Statement (EIS). An EIS... issues and impacts. The transmittal letter to EPA as well as the cover sheet should clearly identify the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... the environment. Solutions were focused on decreasing erosion on the White River containment structure... Preparation of an Environmental Impact Statement (EIS) for the Arkansas White River Cutoff Study AGENCY... Impact Statement (EIS) for the Arkansas White River Cutoff Study. The original Notice of Intent (NOI) was...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
... Statement/Overseas Environmental Impact Statement for Hawaii-Southern California Training and Testing AGENCY... Final Environmental Impact Statement (EIS)/Overseas EIS (OEIS) for Hawaii- Southern California Training.... Navy Training and Testing Activities in the Hawaii- Southern California Training and Testing Study Area...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
... Impact Statement/ Environmental Impact Statement, Upper Truckee River and Marsh Restoration Project, El... Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The... prepare email comments for the Project. The public hearings will be held at 128 Market Street, Stateline...
77 FR 49792 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 08/06/2012 Through..., Comment Period Ends: 10/01/2012, Contact: Brian Hasselbach 406-441-3908. EIS No. 20120266, Draft EIS, USFS... Ends: 10/01/2012, Contact: Harold Dyer 719-852-6215. EIS No. 20120267, Draft EIS, USN, VA, Outdoor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... Multimodal Transportation Project, which includes highway, transit, and non-motorized trail components in... non-motorized trail components in Clark County, Nevada is being withdrawn. The NOI for the EIS was...
43 CFR 3430.3-2 - Environmental analysis.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Juan Regional Coal Environmental Impact Statement (March 1984), the Savery Coal EIS (July 1983), and... impact statement on the application. (b) The environmental analysis may be conducted in conjunction with and included as part of the environmental impact statement required for coal activity planning under...
43 CFR 3430.3-2 - Environmental analysis.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Juan Regional Coal Environmental Impact Statement (March 1984), the Savery Coal EIS (July 1983), and... impact statement on the application. (b) The environmental analysis may be conducted in conjunction with and included as part of the environmental impact statement required for coal activity planning under...
43 CFR 3430.3-2 - Environmental analysis.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Juan Regional Coal Environmental Impact Statement (March 1984), the Savery Coal EIS (July 1983), and... impact statement on the application. (b) The environmental analysis may be conducted in conjunction with and included as part of the environmental impact statement required for coal activity planning under...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... and Environmental Impact Statement (GMP/EIS) for Chattahoochee River National Recreation Area (CRNRA...) announces the availability of a Final GMP/EIS for the CRNRA, Georgia. Consistent with NPS laws, regulations, and policies, and the purpose of the CRNRA, the Final GMP/EIS describes Alternative F at the NPS...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... Impact Statement (GMP/EIS) for Lincoln Home National Historic Site, Illinois. DATES: The draft GMP/EIS... meetings will be held during the 60-day review period on the GMP/EIS in Springfield, Illinois, in summer... the draft GMP/EIS are available from the Superintendent, 413 South Eighth Street, Springfield...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
...: The Abbreviated Final General Management Plan and Environmental Impact Statement (GMP/EIS) will remain... Site. SUPPLEMENTARY INFORMATION: We, the National Park Service, prepared a draft GMP/EIS for the park... summaries of the draft GMP/EIS. In addition to the distribution, the draft GMP/EIS was also made available...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
... Statement (EIS) for the Formal Training Unit (FTU) and Main Operating Base 1 (MOB 1) for the Beddown of KC... Statement (EIS) for the Formal Training Unit (FTU) and Main Operating Base 1 (MOB 1) for the Beddown of KC...-46A tanker aircraft, associated infrastructure and manpower of the FTU and MOB 1 at existing active...
32 CFR 989.16 - Environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Environmental impact statement. 989.16 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.16 Environmental impact statement. (a) Certain classes of environmental impacts normally require preparation of an EIS (40 CFR 1501.4). These include...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
...In accordance with the National Environmental Policy Act (NEPA), 42 U.S.C. 4321-4347, the Department of State (DOS) announces its intent to prepare an Environmental Impact Statement (EIS) and initiate the scoping process for the proposed agency action as specified below. The EIS will evaluate the impacts on the affected environment, including, but not limited to, socioeconomics, traffic and transportation, land use, historic and cultural resources, noise, air quality, environmental justice, and cumulative impacts.
76 FR 12788 - Environmental Impact Statement for a Proposed Urban Rail system in Austin, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Environmental Impact Statement for a... Intent to Prepare an Environmental Impact Statement. SUMMARY: The Federal Transit Administration (FTA... Impact Statement (EIS) for the proposed Urban Rail system in Austin, Texas. The EIS will be prepared in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-14
...: The park includes five remote islands spanning 2,228 square miles of land and sea. Updating the park's... General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands National Park... (GMP)/Wilderness Study/Environmental Impact Statement (EIS) for Channel Islands National Park. The...
32 CFR 644.316 - Environmental considerations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Impact Statement (EIS) be prepared, circulated among interested Federal, State and local agencies, and... affects the quality of the human environment. This may include some disposals. No major disposal action... agency, until the required EIS has be submitted to the EPA unless a “Finding of No Significant Impact...
32 CFR 644.316 - Environmental considerations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Impact Statement (EIS) be prepared, circulated among interested Federal, State and local agencies, and... affects the quality of the human environment. This may include some disposals. No major disposal action... agency, until the required EIS has be submitted to the EPA unless a “Finding of No Significant Impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...), which is included as an Appendix to the EIS, for the Southern Nevada Water Authority's (SNWA) Clark...--Central Nevada Regional Water Authority, White Pine, Lincoln, and Clark counties (NV); and Juab, Millard...
78 FR 4586 - Environmental Impact Statement: Kake Access, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Kake... Environmental Impact Statement (EIS) for a proposed transportation project to improve access to and from the... written comments on environmental concerns that should be addressed in the EIS. The public scoping...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Environmental Impact Statement, Tappan Zee Bridge/I-287 Corridor Project (Rockland and Westchester Counties, New... an Environmental Impact Statement (EIS) for the proposed Tappan Zee Bridge/I-287 Corridor project... Port Chester, Westchester County, New York including the Tappan Zee Bridge over the Hudson River. The...
75 FR 3729 - Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-22
... to address downstream water quality impairment, and funding. Rating LO. EIS No. 20090403, ERP No. D... concerns about this project's potential air quality impacts, and recommended additional information and analysis regarding potential air quality impacts and mitigation be included in the FEIS. Rating EC1. EIS No...
Forestry Herbicide Environmental Risks--An EIS Perspective
D.G. Neary
1989-01-01
The U.S. Forest Service is in the process of completing Environmental Impact Statements (EIS's) on vegetation management for three physiographic regions of the South. This includes all forestry activities involving manipulation of plants in national forests and grasslands of the Coastal Plain-Piedmont, Appalachian Mountains, and the Ozark/Ouachita Mountains. These...
75 FR 39555 - Environmental Impact Statement; Fort Hamer Bridge, Manatee County, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-09
..., Florida. This includes suggesting analyses, methodologies and possible sources of data or information... and written comments relating to the proposed Fort Hamer Bridge and the preparation of an EIS. This... EIS or possible sources of data or information we should consider. Public Scoping Meeting The Public...
32 CFR 651.43 - Format of the EIS.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.43 Format of the EIS. The... following (detailed content is discussed in appendix E of this part): (a) Cover sheet. (b) Summary. (c) Table of contents. (d) Purpose of and need for the action. (e) Alternatives considered, including...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-16
... Prepare a Supplemental Environmental Impact Statement (EIS) SUMMARY: Consistent with the regulations... 248; Central Planning Area (CPA) Lease Sales 227, 231, 235, 241, and 247, Final Environmental Impact... Supplemental Environmental Impact Statement (OCS EIS/EA BOEM 2013-0118) (WPA 233/CPA 231 Supplemental EIS). The...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Withdrawal of the Environmental Impact Statement (EIS) Development Process for the Proposed Beluga to Fairbanks (B2F) Natural Gas... discontinuing the EIS development process associated with the proposed B2F pipeline. FOR FURTHER INFORMATION...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...] Notice of Availability of the Draft Programmatic Environmental Impact Statement for Solar Energy... Draft Programmatic Environmental Impact Statement (EIS) for Solar Energy Development in Six Southwestern... preferred method of commenting. Mail: Addressed to: Solar Energy Draft Programmatic EIS, Argonne National...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-28
... mirrors concentrate solar energy onto the solar receiver of the PCU. The project also includes an..., LVRAB109AA01] Notice of Availability of the Final Environmental Impact Statement for the Imperial Valley Solar... Management Plan (RMP) Amendment/Final Environmental Impact Statement (EIS) for the Imperial Valley Solar, LLC...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-23
... Prepare a Supplemental Environmental Impact Statement (EIS). SUMMARY: Consistent with the regulations... Supplemental EIS will update the environmental and socioeconomic analyses in the Gulf of Mexico OCS Oil and Gas... Area Lease Sales 227, 231, 235, 241, and 247, Final Environmental Impact Statement (OCS EIS/EA BOEM...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Management Environmental Impact Statement for the Hanford Site, Richland, WA AGENCY: Department of Energy... Statement for the Hanford Site, Richland, Washington (Draft EIS, DOE/EIS-00391), made available for public... Draft EIS is also available through the Hanford Web site at: http://www.hanford.gov/orp . Issued in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... the availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS) for the South Unit of Badlands National Park, South Dakota. DATES: The Final GMP/EIS will remain available... Register by the Environmental Protection Agency. ADDRESSES: Copies of the GMP/EIS are available by request...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... quality of the environmental decision making. The public includes affected and interested Federal, state... EIS for the LCA Ecosystem Restoration Study, November 2004. The record of decision for the... Ecosystem Restoration Study, November 2004. The record of decision for the programmatic EIS was signed on...
76 FR 21345 - Environmental Impacts Statements;
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
...'Driscoll 1-866- 208-3372. EIS No. 20110112, Draft EIS, BLM, NM, HB In-Situ-Solution Mining Project.../08/2011 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act, EPA... summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has included its...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-02
... interchange at Seltice. Impacts to the social, economic, and natural environment were minimal. After receiving... to Prepare an Environmental Impact Statement (EIS), Kootenai County, ID AGENCY: Federal Highway Administration. ACTION: Rescind Notice of Intent to prepare an Environmental Impact Statement. SUMMARY: The FHWA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... Statement for the Proposed Ivanpah Solar Electric Generation System Project, San Bernardino County, CA... Notice of Availability of the Draft Ivanpah Solar Electric Generation System EIS and the Draft California... prepared a Supplemental Draft Environmental Impact Statement (EIS) for the Proposed Ivanpah Solar Electric...
Code of Federal Regulations, 2013 CFR
2013-07-01
... assessment and a Finding of No Significant Impact (FONSI) (40 CFR 1508.13; FSH 1909.15, Chapter 40... environmental impact statement, therefore, will not be prepared. It includes the environmental assessment or a... significant effect on the human environment and for which neither an environmental impact statement (EIS) nor...
Code of Federal Regulations, 2014 CFR
2014-07-01
... assessment and a Finding of No Significant Impact (FONSI) (40 CFR 1508.13; FSH 1909.15, Chapter 40... environmental impact statement, therefore, will not be prepared. It includes the environmental assessment or a... significant effect on the human environment and for which neither an environmental impact statement (EIS) nor...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-29
..., state and local levels. While CDFW has participated in the development of this joint EIS/ EIR, the... alternatives on the human and physical environment, including, but not limited to, effects on biological... inspection at several libraries and government offices. A full list of locations where the final EIS/EIR is...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... Aurora, Colorado (southeast Denver metropolitan area). The remediation actions will be identified through... options may include federal actions which will be the subject of the EIS. 2. Remediation Alternatives. The draft EIS will address an array of remediation alternatives that could reduce the risk of life loss...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
... and Extend the Scoping Comment Period for the Environmental Impact Statement for the Four Corners... should consider in the planning and preparation of an environmental impact statement (EIS) for the Four... subject line of your email message, please indicate that the comments are ``Four Corners-Navajo Mine EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-06
...) obligations related to MTA's request for financing for the East Side Access project through the FRA Railroad... Statement (EIS) and Participation in the Section 106 Programmatic Agreement for the East Side Access Project... adoption and recirculation of the Final Environmental Impact Statement for the East Side Access Project and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Environmental Impact Statement for the North Branch Ecorse Creek, Flood Risk Management General Reevaluation... Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement (EIS) for flood risk management... flood risk management measures. The GRR/EIS is being completed in partnership with Wayne County, MI. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...
76 FR 45554 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
.... 20110231, Final EIS, BLM, NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and.... EIS No. 20110241, Draft EIS, NNSA, NV, Site-Wide EIS--Continued Operation of the Department of Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Environmental Impact Statement (EIS) for the Criminal Alien Requirement 9 project (CAR 9). This notice briefly describes the history of the CAR 9 EIS. SUPPLEMENTARY INFORMATION: Background In accordance with the...
Notification: National Environmental Policy Act (NEPA) Environmental Impact Statements (EIS) Reviews
October 29, 2012. The EPA's OIG plans to begin preliminary research on EPA’s reviews of National Environmental Policy Act (NEPA) environmental impact statements (EIS) as submitted to EPA under Section 309 of the Clean Air Act.
78 FR 50054 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... Nottingham 301-496-7775. EIS No. 20130237, Final EIS, NMFS, NJ, FEIS Amendment 14 to the Atlantic Mackerel... and the U.S. Department of Agriculture's Forest Service are joint lead agencies for the above EIS. EIS...
78 FR 24743 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
.../2013, Contact: Walt George 307-775-6116. EIS No. 20130103, Final EIS, NMFS, 00, Amendment 5 to the...: 05/28/2013, Contact: Peter Cooper 301-427-8503. EIS No. 20130107, Final EIS, NRCS, WY, Henrys Fork...
77 FR 31355 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
...: https://cdx.epa.gov . EIS No. 20120157, Final EIS, FTA, GA, Tier 1--Atlanta Beltline City of Atlanta..., Review Period Ends: 06/ 25/2012, Contact: Brian Smart 404-865-5600. EIS No. 20120158, Draft EIS, USACE...
10 CFR 1021.313 - Public review of environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) The public review and comment period on a DOE draft EIS shall be no less than 45 days (40 CFR 1506.10... the Federal Register. (b) DOE shall hold at least one public hearing on DOE draft EISs. Such public... draft EIS and include the location, date, and time of the public hearings. (c) DOE shall prepare a final...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
..., 474 megawatt (MW) wind energy project including 158 wind turbine generators, a substation... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Notice of Intent To Prepare a Joint Supplemental Environmental Impact Statement and Environmental Impact Report for the Folsom Dam... significant issues to be analyzed in depth in the EIS/EIR include project specific and cumulative [[Page 54452...
7 CFR 520.7 - Preparation of an Environmental Impact Statement (EIS).
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 6 2013-01-01 2013-01-01 false Preparation of an Environmental Impact Statement (EIS). 520.7 Section 520.7 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE PROCEDURES FOR IMPLEMENTING NATIONAL ENVIRONMENTAL POLICY ACT...
7 CFR 520.7 - Preparation of an Environmental Impact Statement (EIS).
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 6 2012-01-01 2012-01-01 false Preparation of an Environmental Impact Statement (EIS). 520.7 Section 520.7 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE PROCEDURES FOR IMPLEMENTING NATIONAL ENVIRONMENTAL POLICY ACT...
7 CFR 520.7 - Preparation of an Environmental Impact Statement (EIS).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 6 2010-01-01 2010-01-01 false Preparation of an Environmental Impact Statement (EIS). 520.7 Section 520.7 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE PROCEDURES FOR IMPLEMENTING NATIONAL ENVIRONMENTAL POLICY ACT...
7 CFR 520.7 - Preparation of an Environmental Impact Statement (EIS).
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 6 2014-01-01 2014-01-01 false Preparation of an Environmental Impact Statement (EIS). 520.7 Section 520.7 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE PROCEDURES FOR IMPLEMENTING NATIONAL ENVIRONMENTAL POLICY ACT...
7 CFR 520.7 - Preparation of an Environmental Impact Statement (EIS).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 6 2011-01-01 2011-01-01 false Preparation of an Environmental Impact Statement (EIS). 520.7 Section 520.7 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE PROCEDURES FOR IMPLEMENTING NATIONAL ENVIRONMENTAL POLICY ACT...
28 CFR 61.5 - Typical classes of action.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... These classes are: actions normally requiring environmental impact statements (EIS), actions normally not requiring assessments or EIS, and actions normally requiring assessments but not necessarily EIS...) Actions normally requiring EIS. None, except as noted in the appendices to this part. (2) Actions normally...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-15
... NUCLEAR REGULATORY COMMISSION [NRC-2010-0143] Notice of Intent To Prepare an Environmental Impact... intent to prepare an Environmental Impact Statement (EIS) evaluating this proposed action. The EIS will examine the potential environmental impacts of the proposed INIS facility. DATES: NRC invites public...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Draft Environmental Impact Statement (EIS), Initiate the Public Scoping Period and Host Public Scoping Meetings for the Great Lakes and Mississippi River Interbasin Study (``GLMRIS''); Correction, Clarification... international commerce, travel and local practices, ANS have been introduced throughout the Mississippi River...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
... Transmission Line Project Draft Environmental Impact Statement AGENCY: Department of Energy. ACTION: Extension... comment period for the Champlain Hudson Power Express Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0447). The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action...
75 FR 16786 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar... No. 20100107, Draft EIS, BLM, CA, Calico Solar Project, Proposed Solar Thermal Electricity Generation... 04/02/2010. EIS No. 20100054, Draft EIS, NASA, VA, Wallops Flight Facility, Shoreline Restoration and...
78 FR 45190 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
...: David Libman 404-507-5701. EIS No. 20130220, Draft EIS, NPS, OH, Cuyahoga Valley National Park White.... 20130176, Draft EIS, APHIS, TX, Cattle Fever Tick Eradication Program--Tick Control Barrier, Comment Period...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
... the South Gillette Area West Coal Creek Coal Lease-by-Application, Wyoming AGENCY: Bureau of Land... Decision (ROD) for the West Coal Creek Coal Lease-by- Application (LBA) included in the South Gillette Area Coal Lease Applications Final Environmental Impact Statement (EIS). ADDRESSES: The document is...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-07
[email protected]gov Include ``Comment to T.F. Green Draft Written Re-Evaluation'' in the subject line Mail... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Draft Written Re-Evaluation for... notice to advise the public that a Draft Written Re-Evaluation for an Environmental Impact Statement (EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent to Prepare a Draft Environmental Impact Statement for the Proposed Cordova Hills Project in Sacramento County, CA, Corps Permit.... Potentially significant issues to be analyzed in depth in the EIS include loss of waters of the United States...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-08
...Pursuant to section 102(2)(c) of the National Environmental Policy Act of 1969, as implemented by the Council on Environmental Quality Regulations (40 Code of Federal Regulations parts 1500-1508), and Executive Order 12114, the Department of the Navy (DoN) announces its intent to prepare an Environmental Impact Statement (EIS)/Overseas Environmental Impact Statement (OEIS) to evaluate the potential environmental effects associated with maintaining military readiness training and research, development, testing, and evaluation (hereafter referred to as ``training and testing'') activities conducted in the Mariana Islands Training and Testing (MITT) EIS/OEIS Study Area. The MITT Study Area includes the existing Mariana Islands Range Complex (MIRC), additional areas on the high seas, and a general transit corridor between Hawaii to MITT where training and testing activities may occur. The MIRC is the only major Navy range complex in the Study Area. The DoN is preparing this EIS/OEIS to renew current regulatory permits and authorizations, address current training and testing not covered under existing permits and authorizations, and to obtain those permits and authorizations necessary to support force structure changes and emerging and future training and testing requirements including those associated with new platforms and weapons systems within the MITT Study Area, starting in 2015, thereby ensuring critical Department of Defense (DoD) requirements are met. The DoN will invite the National Marine Fisheries Service, United States (U.S.) Fish and Wildlife Service (Pacific Islands Fish and Wildlife Office), and U.S. Air Force, to be cooperating agencies in preparation of the EIS/OEIS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).
1983-01-01
which involves unresolved conflicts e. V.V..4 President OMB Cirua * NEPA of 1969 (42 U.S.C. 4321) CEQ/EIS Guidelines 40 CFR 1500-1508 . 7 Excuiv Ordc...Classification and Declassification Committee under the EPA Administrator reviews and reco- 4 " mmends to the Administrator actions where conflicts arise out of...Ordinaces - 1. Permits 2. Regulations 3. Specific Enviromental Parameters 4. Zoning Regulations *!’- I. EIS statements for the Puget Sound Project
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false EIS policy. 50.41 Section 50.41 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY Environmental Impact Statements § 50.41 EIS policy. EIS's...
77 FR 47839 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... electronic reporting site-- https://cdx.epa.gov/epa_home.asp EIS No. 20120257, Final EIS, BR, CA, San Joaquin... No. 20120262, Draft EIS, BR, CA, San Luis Reservoir State Recreation Area Resource Management Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-14
... amended, the Bureau of Land Management (BLM), Battle Mountain District, Mount Lewis Field Office, Battle Mountain, Nevada, has prepared a Final Supplemental Environmental Impact Statement (EIS) for the Cortez... Final Supplemental EIS are available for public inspection at the Battle Mountain District Office, 50...
36 CFR 907.9 - Preparation of an EIS.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENVIRONMENTAL QUALITY § 907.9 Preparation of an EIS. (a) Notice of intent. When PADC decides to prepare an environmental impact statement, it shall publish a notice of intent in the Federal Register in accordance with... environmental impact statement will be prepared and publishing the notice of intent, PADC will begin to prepare...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
...) announces its intent to prepare a General Management Plan and Environmental Impact Statement (GMP/EIS) for... implementation of the GMP. The Paterson Great Falls NHP Advisory Commission will be involved early in the... planners in the NPS Northeast Region, with assistance from advisors and consultants, the GMP/EIS will...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... Statement (EIS) for the General Management Plan (GMP) for Fort Matanzas National Monument (Monument... EIS/GMP describes the NPS preferred alternative--Alternative B--to guide the management of the... prescriptions to ensure protection, access and enjoyment of the Monument's resources. An up-to-date GMP is...
21 CFR 25.22 - Actions requiring the preparation of an environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 1 2011-04-01 2011-04-01 false Actions requiring the preparation of an... Environmental Consideration § 25.22 Actions requiring the preparation of an environmental impact statement. (a... environment and that therefore ordinarily require the preparation of an EIS. (b) EIS's are prepared for agency...
21 CFR 25.22 - Actions requiring the preparation of an environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Actions requiring the preparation of an... Environmental Consideration § 25.22 Actions requiring the preparation of an environmental impact statement. (a... environment and that therefore ordinarily require the preparation of an EIS. (b) EIS's are prepared for agency...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... the Draft Environmental Impact Statement for the Toledo Bend Hydroelectric Project On May 17, 2013, the Commission issued a Draft Environmental Impact Statement (draft EIS) for the Toledo Bend Hydroelectric Project No 2105-036 (Toledo Bend Project). The draft EIS documents the views of governmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-08
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Extending Scoping Period To Prepare a Programmatic Environmental Impact Statement (EIS) for the Navajo Nation Integrated Weed Management Plan Within... Integrated Weed Management Plan on the Navajo Indian Reservation. DATES: Scoping comments are due on March 20...
78 FR 29131 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
...-202- 3960. EIS No. 20130126, Final EIS, BLM, AZ, Mohave County Wind Farm Project, Review Period Ends..., Contact: Doug Grupenhoff 406-827-0741. EIS No. 20130129, Draft EIS, USA, TX, Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort Bliss, Texas and New Mexico, Comment Period...
77 FR 60986 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
.../2012, Contact: Liana Liu 360-753-9553. EIS No. 20120312, Final EIS, USFS, NV, Geothermal Leasing on the Humboldt-Toiyabe National Forest, To Facilitate the Development and Production of Geothermal Energy, Ely..., Contact: Jerald Weaver 360-378-2223. EIS No. 20120314, Draft EIS, WAPA, WY, Hermosa West Wind Energy...
78 FR 17662 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
..., Bell Island Geothermal Leases, Review Period Ends: 04/22/2013, Contact: Sarah Samuelson 907- 789-6274... 571-256-2783. EIS No. 20130067, Draft EIS, WAPA, ND, Wilton IV Wind Energy Center, Comment Period Ends...-9553. EIS No. 20130070, Draft EIS, WAPA, USFWS, 00, PROGRAMMATIC--Upper Great Plains Wind Energy...
77 FR 77076 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
...-557-5107. EIS No. 20120397, Final EIS, BLM, AK, National Petroleum Reserve-- Alaska (NPR-A) Integrated.... EIS No. 20120398, Final EIS, NPS, WI, Ice Age Complex at Cross Plains General Management Plan... Flood Risk in the Sutter Basin, Sutter and Butte Counties, CA, Comment Period Ends: 02/13/2013, Contact...
24 CFR 58.55 - Notice of intent to prepare an EIS.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Notice of intent to prepare an EIS... Statements § 58.55 Notice of intent to prepare an EIS. As soon as practicable after the responsible entity decides to prepare an EIS, it must publish a NOI/EIS, using the HUD recommended format and disseminate it...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-19
... wind farm development on adjacent private lands which would include up to 52 wind turbines and... Wind Power Right-of-Way, Crook and Deschutes Counties, OR AGENCY: Bureau of Land Management, Interior... Impact Statement (EIS) for the proposed West Butte Wind Power Right-of- Way (ROW) in Crook and Deschutes...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Actions that normally require the preparation of an Environmental Impact Statement (EIS). 1940.313 Section 1940.313 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMEN...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-24
...'s (DOE) Office of Fossil Energy is cancelling the environmental impact statement (EIS) under the... (202) 586-7031. SUPPLEMENTARY INFORMATION: The DOE's Office of Fossil Energy is cancelling the EIS for... Laboratory, Office of Fossil Energy. [FR Doc. 2012-1351 Filed 1-23-12; 8:45 am] BILLING CODE 6450-01-P ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... be considered, all comments on the Draft EIS must be received by September 27, 2012. The DoN will... (DoN) is extending the public comment period for the Draft Environmental Impact Statement (EIS) for the Proposed Modernization and Expansion of Townsend Bombing Range (TBR), Georgia (GA) until September...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... Statement (EIS) to evaluate the impacts of, and alternatives to, the proposed issuance of an Endangered... alternatives and issues to be addressed in the draft EIS must be received by close of business on June 3, 2010... gather the information necessary to determine impacts and alternatives to support a decision regarding...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ENVIRONMENTAL PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) Pt. 989, App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-07
... Environmental Impact Statement (EIS) for the San Juan Creek and Tributaries Flood Risk Management Study, Orange... evaluate flood risk management alternative measures along the lower portions of San Juan, Trabuco, and Oso... Trabuco Creek have been channelized for flood risk management and erosion control within the City of San...
78 FR 53754 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... Everglades Planning Project, Comment Period Ends: 10/15/2013, Contact: Gretchen Ehlinger 904 232-1682. EIS No. 20130251, Final EIS, USFS, MN, BWCAW Non-native Invasive Plant Management Project, Review Period Ends: 10... Project, Comment Period Ends: 10/15/2013, Contact: Pete Gomben 801-999-2182. EIS No. 20130255, Draft EIS...
75 FR 68355 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... District Olympic National Forest, Olympic National Park, Jefferson County, WA, Wait Period Ends: 12/06/2010...: Lynne Urquhart 334-274-6371. EIS No. 20100431, Final EIS, USFS, WA, Dosewallips Road Washout Project, To...: 12/20/2010, Contact: Amy Henry 865-632-4045. EIS No. 20100433, Final EIS, USFS, CA, Plumas National...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-10-01
This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deepmore » hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This EIS reflects the public review of and comments offered on the draft statement. Included are descriptions of the characteristics of nuclear waste, the alternative disposal methods under consideration, and potential environmental impacts and costs of implementing these methods. Because of the programmatic nature of this document and the preliminary nature of certain design elements assumed in assessing the environmental consequences of the various alternatives, this study has been based on generic, rather than specific, systems. At such time as specific facilities are identified for particular sites, statements addressing site-specific aspects will be prepared for public review and comment.« less
On the preparation of environmental impact statements in the United States of America
NASA Astrophysics Data System (ADS)
Carson, James E.
The National Environmental Policy Act of 1969 (NEPA) requires that an Environmental Impact Statement (FIS) be prepared whenever a federal action is considered that could result in a significant impact on the environment. Such actions include the issuance of construction or operating licenses for nuclear facilities and power plants, hydroelectric dams, or the diversion of water from rivers and lakes. An EIS is usually required if federal funds are involved. The U.S. Environmental Protection Agency and U.S. Council for Environmental Quality have developed guidelines and regulations for the preparation of an EIS. An EIS is not a scientific report. It is a legal document whose primary function is its use by decision-making agencies in approving or not approving the proposed federal action. The EIS is also used to inform the public and other government agencies of the environmental impacts of the proposed facility. The NEPA process allows public input into the decision-making process. An EIS should be short and concise, analytical, conclusory, be written for a non-technical audience, discuss the pros and cons of the proposed facility, and examine the impacts of all alternatives to the proposed action. The EIS should identify all adverse environmental impacts that cannot be avoided. The conclusions reached in the EIS should be clearly stated and supported by discussions and data in the text and by references to show that the agency has made the necessary analyses. The paper discusses the purpose and contents of these documents and the environmental procedures used in the U.S.A., especially as they relate to nuclear power plants.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... (Branchinecta lynchi), vernal pool tadpole shrimp (Lepidurus packardi), Sacramento Orcutt grass (Orcuttia viscida) and slender Orcutt grass (Orcuttia tenuis). The EIS will include alternatives to the Proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-05
... environmental assessment (EA) for proposed Gulf of Mexico Outer Continental Shelf (OCS) oil and gas Lease Sale... Environmental Impact Statement; Volumes I and II (Multisale EIS, OCS EIS/EA MMS 2007-018) and in the Gulf of...; Western Planning Area Sales 210, 215, and 218--Final Supplemental Environmental Impact Statement...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Procedures for Holding Public Hearings on Draft Environmental Impact Statements (EIS) C Appendix C to Part 989 National Defense Department of Defense (Continued..., App. C Appendix C to Part 989—Procedures for Holding Public Hearings on Draft Environmental Impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Transportation; Notice of Extension of Comment Period for the Draft Environmental Impact Statement for the SpaceX... Notice of Availability (NOA) for the FAA's Draft Environmental Impact Statement for the SpaceX Texas... regarding the Draft EIS to Ms. Stacey M. Zee, FAA Environmental Specialist, SpaceX EIS c/o Cardno TEC Inc...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
..., regulations, and policies and the purpose of the Cumberland Gap National Historical Park, the Final GMP/EIS... prescriptions to ensure protection, access and enjoyment of the park's resources. The Final GMP/EIS describes... Final GMP/EIS contains NPS responses to public comments on the Draft GMP/EIS, and copies of agency...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
...). The Proposed Action includes the decontamination and decommissioning of the waste storage tanks and... site facilities identified in the Final EIS would be removed; contaminated soil, sediment, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-07
... (EIS) for the General Management Plan (GMP) for Kings Mountain National Military Park (Park), South... Service (NPS) is terminating preparation of an EIS for the GMP for the Park, South Carolina. A Notice of Intent to prepare an EIS for the Park GMP was published in the Federal Register on October 10, 2006 (71...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Copper Flat Mine Plan of... the Draft EIS. ADDRESSES: You may submit comments related to the Copper Flat EIS Project by any of the... New Mexico Copper Corp. to re-start the Copper Flat Mine located in Sierra County, New Mexico. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Environmental Impact Statement (EIS) for Proposed Conversion to the F-15 Aircraft for the 144th Fighter Wing... conversion to the F-15 aircraft at the 144th Fighter Wing (144 FW) installation at Fresno-Yosemite... action alternatives analyzed will be a conversion from 18 F-16 PAA to 18 F-15 PAA; or conversion to 24 F...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-26
... Terminate the Environmental Impact Statement on a Gates of the Arctic National Park and Preserve General... Management Plan Amendment (GMPA) for Gates of the Arctic National Park and Preserve. The NPS published a notice of intent to prepare an EIS on a GMPA/Wilderness Study EIS for Gates of the Arctic National Park...
Code of Federal Regulations, 2010 CFR
2010-04-01
... fullest extent practicable the Environmental Assessment or, when required, Environmental Impact Statement.... For each environmental assessment and impact statement, the appropriate RFO will establish a specific...) Environmental Impact Statements. Environmental Impact Statements (EIS's) as required under Section 102(2)(C) of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... fullest extent practicable the Environmental Assessment or, when required, Environmental Impact Statement.... For each environmental assessment and impact statement, the appropriate RFO will establish a specific...) Environmental Impact Statements. Environmental Impact Statements (EIS's) as required under Section 102(2)(C) of...
76 FR 19772 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... Barker 208-735-2072. EIS No. 20110101, Final EIS, USFS, CO, Big Moose Vegetation Management Project... Salvage Project, Proposal to Treat Timer Harvest, Prescribe Fire, and Mechanical Thinning, Uinta-Wasatch... No. 20110107, Final EIS, FHWA, IL, Illinois 336 Corridor Project, (Federal Aid Primary Route 315...
75 FR 19969 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
.... 20100121, Draft EIS, DOI, CA, Stanford University Habitat Conservation Plan, Authorization for Incidental... Corridor, Propose to Construct Roadway Improvements from Farm-to-Market (FM) 2920 to Interstate Highway (IH... Mott, 512- 536-5964. EIS No. 20100124, Final EIS, NPS, CA, Prisoners Harbor Coastal Wetland Restoration...
75 FR 8936 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... Notices EIS No. 20090421, Draft EIS, NRC, WY, Moore Ranch In-Situ Uranium Recovery (ISR) Project, Proposal to Construct, Operate, Conduct Aquifer Restoration, and Decommission an In-Situ Recovery (ISR... No. 20090423, Draft EIS, NRC, WY, Nichols Ranch In-Situ Uranium Recovery (ISR) Project, Proposal to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield weremore » determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.« less
76 FR 29240 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
...-283-7681. EIS No. 20110150, Final EIS, DOE, ID, ADOPTION--Areva Eagle Rock Enrichment Facility... Uranium Enrichment Facility, Construction, Operation, and Decommission, License Issuance, Piketon, OH...
2008-11-21
to air squadrons. 4. USS John F. Kennedy was decommissioned in 2007. Source: Adapted from DoN 2006a Final EIS for the Proposed Homeporting of...Tugs Slot Small Craft 650 35 YD/YC/LCM Source: Adapted from Naval Facilities Engineering Service Center 2002 MCM = Mine Countermeasures DDG...It would include nonradiologically controlled spaces for administrative and other support functions. The design would be a site- adapted replication of
32 CFR 651.23 - Environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 4 2010-07-01 2010-07-01 true Environmental impact statement. 651.23 Section...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Records and Documents § 651.23 Environmental impact statement. An Environmental Impact statement (EIS) is a detailed written statement required...
77 FR 25782 - Environmental Impact Statement: Madison County, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement...: The FHWA is issuing this notice of intent to advise the public that an Environmental Impact Statement... the Illinois Department of Transportation (IDOT) will prepare an Environmental Impact Statement (EIS...
77 FR 23713 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
...-7104. EIS No. 20120109, Draft EIS, FHWA, OR, Salem River Crossing Project, Proposes to Build a Modified.... 20120110, Final EIS, USFWS, CA, Sears Point Wetland and Watershed Restoration Project, To Restore Tidal Wetlands and Rehabilitate Diked Wetlands, Sonoma County, CA, Review Period Ends: 05/ 21/2012, Contact: Don...
75 FR 18204 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
.... 20100108, Draft EIS, BLM, AZ, Sonoran Solar Energy Project, Construction and Operation of a 3756-megawatt (MW) Concentrated Solar Thermal Power Plant and Ancillary Facilities on 3,702 Acres, Right-of- Way..., Contact: Louis Moore 916-978-5106. EIS No. 20100111, Draft EIS, BLM, CA, Ridgecrest Solar Power Project...
77 FR 42727 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
...: https://cdx.epa.gov . EIS No. 20120230, Draft EIS, USACE, CA, Sierra Vista Specific Plan Development... No. 20120232, Final EIS, RUS, MN, Hampton--Rochester--La Crosse Transmission System Improvement... Hampton, MN and La Crosse, WI, Review Period Ends: 08/20/2012, Contact: Stephanie A. Strength 202-720-0820...
75 FR 6018 - Environmental Management Site-Specific Advisory Board, Hanford
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... in the Draft Tank Closure (TC) and Waste Management (WM) Environmental Impact Statement (EIS) Overview of the Draft TC and WM EIS findings by other stakeholder groups Discussion of HAB member comments on the TC and WM EIS Development of HAB advice principles Adjourn Public Participation: The meeting...
77 FR 44234 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... Castillo 509-843-1891. EIS No. 20120242, Final EIS, BLM, WY, Lost Creek In Situ Recovery Project, To... agencies to participate in its e-NEPA electronic EIS submission pilot. Participating agencies can fulfill... filing documents online and providing feedback on the process. To participate in the pilot, register at...
77 FR 25165 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
.... EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery Project, To Analyze the Site... agencies to participate in its e-NEPA electronic EIS submission pilot. Participating agencies can fulfill... filing documents online and providing feedback on the process. To participate in the pilot, register at...
A methodology for post-EIS (environmental impact statement) monitoring
Marcus, Linda Graves
1979-01-01
A methodology for monitoring the impacts predicted in environmental impact statements (EIS's) was developed using the EIS on phosphate development in southeastern Idaho as a case study. A monitoring system based on this methodology: (1) coordinates a comprehensive, intergovernmental monitoring effort; (2) documents the major impacts that result, thereby improving the accuracy of impact predictions in future EIS's; (3) helps agencies control impacts by warning them when critical impact levels are reached and by providing feedback on the success of mitigating measures; and (4) limits monitoring data to the essential information that agencies need to carry out their regulatory and environmental protection responsibilities. The methodology is presented as flow charts accompanied by tables that describe the objectives, tasks, and products for each work element in the flow chart.
Code of Federal Regulations, 2010 CFR
2010-07-01
... quality of the human environment requiring preparation of an Environmental Impact Statement (EIS) pursuant... quality of the marine ecosystem, including the waters of the high seas, the contiguous zone, transitional... found on or below the surface of the seabed but does not include oil, gas, or sulphur; salt or sand and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-03
...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-07
... Final Environmental Impact Statement/Overseas Environmental Impact Statement for Gulf of Mexico Range... set forth in Alternative 2, described in the Final Environmental Impact Statement (EIS)/Overseas Environmental Impact Statement (OEIS) as the Preferred Alternative. The purpose for the proposed action is to...
75 FR 9015 - Environmental Impact Statement: Cook County, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... FHWA is issuing this notice to advise the public that an environmental impact statement will be... Department of Transportation, will prepare an environmental impact statement (EIS) on a proposal to improve...
7 CFR 1794.61 - Environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Environmental impact statement. 1794.61 Section 1794..., DEPARTMENT OF AGRICULTURE (CONTINUED) ENVIRONMENTAL POLICIES AND PROCEDURES Procedure for Environmental Impact Statements § 1794.61 Environmental impact statement. An EIS shall be prepared in accordance with...
Quality of environmental impact statements and variability of scrutiny by reviewers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Kaja, E-mail: kaja.peterson@seit.e
2010-04-15
Adequate provision of information is essential for decision making. This paper provides the results of the quality assessment of Environmental Impact Statements (EIS), documents prescribed by EIA Directive (337/85/EEC). The assessment was completed by several categories of reviewers in Estonia, which has been an EU member state since 2004. The quality assessment of EIS was based on the EC Guidance on EIS Review (2001). Firstly, the quality assessment of 50 randomly selected EIS was carried out by a single reviewer. Secondly, the individual grading among 24 independent reviewers of a single EIS was tested. Thirdly, a comparison of the resultsmore » of 15 individual and 5 group assessments of the same EIS was conducted. The results from the quality assessment of the selected EIS demonstrate a satisfactory level of information provided for decision making; 68% of the sample EIS were positively graded. However, more than half of the 50 EIS were graded as 'just satisfactory'. Comparison between the individual and group assessment of the same EIS demonstrates that the group assessment is more critical than the individual assessment. This possibly results from a wider technical expertise and balancing of subjective values and perspectives among group members. Arguably, the current practice of EIA competent authorities assessing the quality of EIS with individuals could be revised. We discuss the effect of the group assessment on expanding the narrow technical expertise and the subjectivity of a single expert.« less
Nuclear risk assessment for the Mars 2020 mission environmental impact statement.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clayton, Daniel James; Bignell, John L.; Jones, Christopher Andrew
In the summer of 2020, the National Aeronautics and Space Administration (NASA) plans to launch a spacecraft as part of the Mars 2020 mission. One option for the rover on the proposed spacecraft uses a Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) to provide continuous electrical and thermal power for the mission. An alternative option being considered is a set of solar panels for electrical power with up to 80 Light-Weight Radioisotope Heater Units (LWRHUs) for local component heating. Both the MMRTG and the LWRHUs use radioactive plutonium dioxide. NASA is preparing an Environmental Impact Statement (EIS) in accordance with the Nationalmore » Environmental Policy Act. The EIS will include information on the risks of mission accidents to the general public and on-site workers at the launch complex. This Nuclear Risk Assessment (NRA) addresses the responses of the MMRTG or LWRHU options to potential accident and abort conditions during the launch opportunity for the Mars 2020 mission and the associated consequences. This information provides the technical basis for the radiological risks of both options for the EIS.« less
77 FR 59611 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-28
...: Sandy Hurlocker 505-753-7331. EIS No. 20120308, Draft EIS (Tiering), NASA, AK, Sounding Rocket Program (SRP) at Poker Flat Research Range (PFRR), Continuing Sounding Rocket Launches, Alaska, Comment Period...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... U.S. Postal Service to Naval Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS... project Web site ( www.MITT-EIS.com ). All comments, oral or written, submitted during the public review... Facilities Engineering Command Pacific, Attention: MITT EIS/OEIS Project Manager, 258 Makalapa Drive, Suite...
76 FR 10583 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... No. 20110048, Draft EIS, DOE, 00, Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste, Proposed Development, Operation, and Long-Term Management of a Disposal Facility... Period Ends: 03/28/2011, Contact: Cody Wheeler 816-389-3739. EIS No. 20110051, Draft EIS, USN, CA, Marine...
75 FR 11881 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
..., Draft EIS, BLM, CA, Stirling Energy Systems (SES) Solar 2 Project, Construct and Operate, Electric.../2010: Correction to Comment Period from 04/12/2010 to 04/26/2010. EIS No. 20100054, Draft EIS, NASA, VA... FR Notice Published 02/26/2010: Correction to Document Agency from NOAA to NASA. Dated: March 9, 2010...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
...] Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM AGENCY... prepared a Draft Environmental Impact Statement (EIS) for the HB In- Situ Solution Mine Project, and by... considered, the BLM must receive written comments on the HB In-Situ Solution Mine Project Draft EIS within 60...
75 FR 58376 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Seastrand 626-574-5278. EIS No. 20100378, Draft Supplement, USFS, OR, North Fork Burnt River Mining Project.... 20100380, Final EIS, USACE, 00, Sabine-Neches Waterway Channel Improvement Project, Proposed Ocean Dredged...
78 FR 59677 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
..., Designation of the Atchafalaya River Bar Channel Ocean Dredged Material Disposal Site, Review Period Ends: 10.../2013, Contact: Paul Bradford 406-293-6211. EIS No. 20130282, Final EIS, USFS, WY, Clinker Mining...
75 FR 72823 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-26
... Register. EIS No. 20100449, Draft EIS, USFS, MT, Stillwater Mining Revised Water Management Plans and BOE... and Reuse, Implementation, Brunswick, ME, Wait Period Ends: 12/27/2010, Contact: Thomas Stephan 215...
78 FR 31540 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... Davis Corridor, Comment Period Ends: 08/23/2013, Contact: Paul Ziman 801-955-3525. EIS No. 20130132, Final EIS, USFWS, AK, Shadura Natural Gas Development Project within Kenai National Wildlife Refuge...
75 FR 22778 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
...-4711. EIS No. 20100147, Draft EIS, NPS, FL, PROGRAMMATIC--Coral Reef Restoration Plan, Implementation..., Proposes to Salvage Dead and Dying Trees, Treat Excess Fuels, and Plant Trees, Kern River Ranger District...
78 FR 52524 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-23
..., Greater Sage Grouse Bi-State Distinct Population Segment Forest Plan Amendment, Comment Period Ends: 11/20... EIS No. 20130237, Final EIS, NMFS, NJ, FEIS Amendment 14 to the Atlantic Mackerel, Squid, and...
78 FR 57849 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... State Solar South Project Proposed Resource Management Plan Amendment, Review Period Ends: 10/21/2013, Contact: Nancy Christ 702-515-5136. Amended Notices EIS No. 20130227, Draft EIS, NASA, CA, Proposed...
77 FR 26547 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
..., Contact: Bill Dragt 541-573-4473. EIS No. 20120132, Draft EIS, BLM, CA, Haiwee Geothermal Leasing Area, Evaluation of Potential Impacts of Opening for Lease of Federal Mineral Estate for Geothermal Energy...
76 FR 28029 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... 210- 424-8346. EIS No. 20110143, Final EIS, BLM, CA, Palen Solar Power Plant Project, Construction, Operation and Decommission a Solar Thermal Facility on Public Lands, Approval for Right-of-Way Grant...
75 FR 63469 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
...: Sandra Stiles, 504-862-1583. EIS No. 20100407, Final EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction and Operation of Two Concentrated Solar Power Plant Facilties, Right-of-Way...
Environmental Impact Statement (EIS) is a document prepared to describe the effects for proposed activities on federal government to evaluate the effects of its actions on the environment and to consider alternative
75 FR 33299 - Environmental Impacts Statements; Notice Of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
...-963-0182. EIS No. 20100215, Final EIS, USFS, CO, Hermosa Park/Mitchell Lakes Land Exchange Project.../2010 to 07/ 26/2010. Dated: June 8, 2010. Ken Mittelholtz, Deputy Director, NEPA Compliance Division...
77 FR 55213 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... Swansfield 605-343-1567. EIS No. 20120290, Final EIS, USACE, TX, Freeport Harbor Channel Improvement Project... Conditions by Reducing Road-Related Impacts to Wildlife, Fish, Soil, and Water Resources and Restoration of...
77 FR 75632 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-21
..., McCoy Solar Energy Project, Proposed Plan Amendment, Riverside County, CA, Review Period Ends: 01/ 22..., Contact: Sandra Shelin 509-527-7265. EIS No. 20120393, Final EIS, WAPA, AZ, Quartzsite Solar Energy...
78 FR 46940 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-02
... Air Station Key West Airfield Operations Review Period Ends: 09/03/2013, Contact: Greg Timoney 904-542...-0662. EIS No. 20130228, Final EIS, USACE, CO, Chatfield Reservoir Storage Reallocation, Review Period...
75 FR 55326 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-10
..., Contact: Kimberly Kler 360- 396-0927. EIS No. 20100365, Final EIS, BLM, NV, Silver State Solar Energy Project, Construction and Operation of a 400-megawatt Photovoltaic Solar Plant and Associated Facilities...
75 FR 34737 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... 406- 296-2536. EIS No. 20100218, Final EIS, BR, CA, North Bay Water Recycling Program (NBWRP... Green River Area Rangeland Project, Updated Information to the Analyze the Effects of Domestic Livestock...
77 FR 74479 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
..., Contact: Mary Beth Burandt 888-829-6347. EIS No. 20120386, Final EIS, FTA, MD, Red Line Project... Dunes National Recreation Area, Siuslaw National Forest, Coos, Douglas, and Lane Counties OR, Comment...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Read, J.L.
1994-06-01
The merits of the fauna section of the Olympic Dam Project Environmental Impact Statement (EIS) are discussed. The values of different survey methods and monitoring organisms used in this document are evaluated following 10 years of fauna monitoring and research subsequent to the preparation of the EIS. The pilot fauna reconnaissance was found to be of little value, although the associated literature review formed an integral part of the EIS. Over 95% of all amphibian, reptile and bird species recorded at Olympic Dam were confirmed or predicted to occur in the EIS. Mammal predictions were less accurate because of themore » sparse populations and irruptive nature of several arid-zone species. Prediction and monitoring of rare species were demonstrably difficult. The Olympic Dam Project EIS was found in general to be an accurate and useful document. However, it is suggested that more emphasis be placed on establishing monitoring programmes for future EISs, particularly for invertebrates. 35 refs., 1 fig., 3 tabs.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Resources Management Plan/Environmental Impact Statement for Mojave National Preserve. SUMMARY: Pursuant to... preparing a Water Resources Management Plan/Environmental Impact Statement (WRMP/EIS). This plan is intended...
78 FR 56695 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... National Forest Oil and Gas Leasing Analysis Project, Review Period Ends: 10/21/2013, Contact: Rob Hamilton 435-896-1022 EIS No. 20130266, Draft EIS, USN, GU, The Mariana Islands Training and Testing, Comment...
75 FR 65320 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... Eight Allotments, Black Hills National Forest, Pennington and Custer Counties, SD, Wait Period Ends: 11... necessary under Section 1506.3(b) of the CEQ Regulations. EIS No. 20100416, Draft EIS, WAPA, CA, Rice Solar...
76 FR 59125 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
.... Markham 805-585-2150. EIS No. 20110317, Draft EIS, USFS, MT, Lonesome Wood Vegetation Management 2 Project... the 2006 FEIS Analysis and to Correct the Deficiencies that the Meister Panel Identified, Land and...
75 FR 3730 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-22
..., Contact: Steve Johnson, 541-552-2900. EIS No. 20100007, Final EIS, NOAA, 00, Amendment 3 to the Northeast... Reduction, Topsail Island, Pender and Onslow Counties, NC, Comment Period Ends: 03/08/ 2010, Contact: Doug...
75 FR 28612 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... Counties, OR and Adams and Nez Perce Counties, ID, Wait Period Ends: 06/21/2010, Contact: Robert W. Rock.... EIS No. 20100181, Final EIS, DOE, MS, Kemper County Integrated Gasification Combined-Cycle (IGCC...
75 FR 70917 - Environmental Impacts Statements; Notice Of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... Augustin 651-290-5378. Amended Notices EIS No. 20100386, Draft EIS, BLM, UT, Uinta Basin Natural Gas Development Project, To Develop Oil and Natural Gas Resources within the Monument Butte-Red Wash and West...
77 FR 15750 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
...: Sharon Scott 406-449-5201. EIS No. 20120065, Final EIS, BLM, UT, Uinta Basin Natural Gas Development Project, To Develop Oil and Natural Gas Resources within the Monument Butte-Red Wash and West Tavaputs...
77 FR 17051 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
..., Contact: Tina Orcutt 410-962-4290. EIS No. 20120072, Final EIS, FTA, CA, Westside Subway Extension Transit Corridor Project, Extension of the Existing Metro Purple Line and Metro Red Line Heavy Rail Subway, Los...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... System Management (TSM), Bus Rapid Transit (BRT), and Commuter Rail. The AA/EIS will be prepared in.... Transportation System Management (TSM) Alternative: A TSM Alternative, which reflects the best that can be done... regulations. The AA/EIS process provides opportunities for the public to comment on the scope of the EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
... General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort Pulaski National Monument... national monument, the Final EIS/GMP/WS will guide the management of the national monument over the next 20... publication of the Environmental Protection Agency's Notice of Availability of the Final EIS/GMP/WS in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
... Management Plan (EIS/GMP) for Fort Raleigh National Historic Site, North Carolina. The draft describes and... announce the dates, times, and locations of public meetings on the draft EIS/GMP through the NPS Planning... delivery to the above address. Electronic copies of the Draft EIS/GMP will be available online at http...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic Riverways (Riverways) in Missouri. DATES: The Draft GMP/WS/EIS will remain available for public review and... U.S. Environmental Protection Agency. ADDRESSES: Copies of the Draft GMP/WS/EIS will be available to...
75 FR 27053 - Environmental Impact Statement: Multiple Counties, New York, and New Jersey
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-13
... additional data in preparation for Tier II analyses and preliminary design. Tier I of the EIS will result in... providing economic benefits. The FHWA and PANYNJ are serving as joint-lead agencies for the preparation of... for the preparation of the EIS. The EIS analyses will be conducted using ``tiering,'' as described in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
...] Environmental Impact Statement for Proposed General Management Plan, Pinnacles National Monument, San Benito and... Environmental Impact Statement. SUMMARY: The National Park Service is terminating the preparation of an Environmental Impact Statement (EIS) for the General Management Plan, Pinnacles National Monument, California. A...
32 CFR 651.45 - Steps in preparing and processing an EIS.
Code of Federal Regulations, 2010 CFR
2010-07-01
... technical analyses are balanced with environmental analysis, the agency preferred alternative will not...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.45... alternatives based on relevant factors including environmental, economic, and technical considerations and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-15
... channels. The AFTT study area does not include the Arctic. This EIS and OEIS is being prepared to renew and... following the 2nd Fleet area of responsibility (except for the Arctic). The AFTT study area covers...
75 FR 8988 - Environmental Impact Statements; Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... DEPARTMENT OF THE INTERIOR Environmental Impact Statements; Availability AGENCY: National Park Service. ACTION: Notice of availability for the Record of Decision on the Final Environmental Impact...) for the final Environmental Impact Statement (EIS) for the disposition of the Bureau of Mines property...
75 FR 25309 - Environmental Impact Statement: Cook County, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-07
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... FHWA is issuing this Notice to advise the public that an Environmental Impact Statement (EIS) will be... project comprises several elements of the overall Chicago Region Environmental and Transportation...
75 FR 76981 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-10
..., Contact: Cesar Perez 916-498-5065. EIS No. 20100459, Draft EIS, BPA, 00, Big Eddy-Knight Transmission... using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat...
77 FR 40036 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-06
... Ends: 10/03/2012, Contact: Angel Martinez 505-761-8918. EIS No. 20120213, Draft EIS, FRA, IL, Chicago... and Eastern Gulf of Mexico, Cook Inlet, the Beaufort Sea, and the Chukchi Sea, Review Period Ends: 08...
75 FR 51458 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
..., Contact: Kristin Kerwin 720-356-1564. EIS No. 20100329, Final EIS, BLM, CA, Blythe Solar Power Project (09- AFC-6), Application for Right-of Way Grant to Construct and Operate, and Decommission a Solar Thermal...
e-NEPA Guide On Registration And Preparing An EIS For Electronic Submission
The Guide to e-NEPA Electronic Submittal contains information about e-NEPA, how to register for e-NEPA, and how to prepare your Environmental Impact Statement (EIS) for electronic submission through e-NEPA.
76 FR 59159 - Record of Decision; Apostle Islands National Lakeshore, WI
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... Impact Statement (EIS) for the General Management Plan (GMP)/Wilderness Management Plan for Apostle... approved the ROD for the Final GMP/EIS. As soon as practicable, the NPS will begin to implement the...
76 FR 53453 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
.../2011, Contact: Sharon Seim 907-456-0501. EIS No. 20110273, Final EIS, FERC, CA, Kilarc-Cow Creek... Creek and South Cow Creek, Shasta County, CA, Wait Period Ends: 09/26/2011, Contact: Leonard Tao 1-866...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-31
...The Bureau of Reclamation and the San Joaquin River Exchange Contractors Water Authority have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for a 25-Year Water Transfer Program, 2014-2038. The proposed new program would provide for the transfer and/or exchange of up to 150,000 acre-feet of substitute water from the San Joaquin River Exchange Contractors Water Authority to several potential users over a 25-year timeframe (water service years 2014-2038). A Notice of Availability of the joint Draft EIS/EIR was published in the Federal Register on Friday, May 4, 2012 (77 FR 26578). The written comment period on the Draft EIS/EIR ended Tuesday, July 3, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and additional information received during the review period.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
78 FR 20714 - Environmental Impact Statement: Cook County, Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... Department of Transportation, is preparing an environmental impact statement (EIS) on a proposal to improve.... SUMMARY: The FHWA is issuing this revised notice of intent to advise the public that an environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
... Environmental Impact Statement; West Waukesha Bypass, Waukesha County, WI AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Intent to prepare an Environmental Impact Statement. SUMMARY: The FHWA is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-15
... Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). In anticipation of additional... anticipation of this information, DOE is reopening the public scoping period for an indefinite period. DOE will...
76 FR 41791 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
.... Crabtree, PhD 727-824-5305. EIS No. 20110218, Final EIS, BPA, 00, Big Eddy-Knight Transmission Project... Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, WA...
78 FR 15011 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-08
..., Final EIS, DOE, TX, W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project, Review Period.... 20130055, Final EIS, NPS, IA, Effigy Mounds National Monument Final General Management Plan, Review Period...] BILLING CODE 6560-50-P ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-06
...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...
24 CFR 58.37 - Environmental impact statement determinations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Environmental impact statement... Classification § 58.37 Environmental impact statement determinations. (a) An EIS is required when the project is... and Urban Development ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING HUD ENVIRONMENTAL...
23 CFR 771.130 - Supplemental environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Supplemental environmental impact statements. 771.130... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.130 Supplemental environmental impact statements... significant environmental impacts that were not evaluated in the EIS; or (2) New information or circumstances...
44 CFR 9.8 - Public notice requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... provide adequate information to enable the public to have impact on the decision outcome for all actions... impact statement is being prepared, the Notice of Intent to File an EIS is adequate to constitute the... factors which include, but are not limited to: (i) Scale of the action; (ii) Potential for controversy...
44 CFR 9.8 - Public notice requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... provide adequate information to enable the public to have impact on the decision outcome for all actions... impact statement is being prepared, the Notice of Intent to File an EIS is adequate to constitute the... factors which include, but are not limited to: (i) Scale of the action; (ii) Potential for controversy...
75 FR 62627 - Environmental Impact Statement; Davis County, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... County, UT AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Intent. SUMMARY: FWHA is... cooperation with the Utah Department of Transportation (UDOT), will prepare an EIS on a proposal to address... and need and are based on agency and public input. These alternatives include: (1) Taking no action...
USDA-ARS?s Scientific Manuscript database
One alternative in the Bison remote vaccination environmental impact statement (EIS) for Yellowstone National Park includes inoculation of both calves and yearlings. Although RB51 vaccination of bison does protect against experimental challenge, it was unknown whether booster vaccination might enhan...
76 FR 49526 - Environmental Impact Statement; Saint Louis County, MN
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... environmental impacts of alternatives, including (1) No-build, (2) Purchasing title and possession of the.... The Scoping Document/Draft Scoping Decision Document is anticipated to be published in late 2011. A... Decision Document will be published after the public comment period has closed. A Draft EIS will be...
75 FR 8935 - Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... action. Rating LO. EIS No. 20090384, ERP No. D-NOA-K39124-CA, Fruit Growers Supply Company's Multi... action. Rating LO. Final EISs EIS No. 20090016, ERP No. F-FAA-B40165-MA, New Bedford Regional Airport...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... of the scoping process to solicit public comments and identify issues for the EIS. DATES: This notice initiates the public scoping process for the EIS. Comments on issues related to the EIS may be submitted in... April 2012. In mid-October 2012, NextEra Blythe Solar Energy Center, LLC (NBSEC), purchased the un-built...
A study of the review and comment phase of the environmental impact statement : draft and negative.
DOT National Transportation Integrated Search
1972-01-01
This study examined the agencies that review the environmental impact statements (EIS) prepared on highway projects and was an attempt to shed light on the functions, personnel, and problems of the offices that saw the statements. The report covered ...
77 FR 59703 - Environmental Impact Statement; Taos Regional Airport, Taos, NM
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-28
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Environmental Impact Statement; Taos...'' Environmental Impact Statement (EIS). The Town of Taos, owner and operator of Taos Regional Airport located in Taos, New Mexico, has requested the FAA to approve revisions to its Airport Layout Plan (ALP) to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
...-FF08ECAR00] Draft Supplemental Environmental Impact Report/Environmental Impact Statement for a Proposed... Conservation Commission (CVCC), has prepared a joint draft Supplemental Environmental Impact Report/Environmental Impact Statement (draft Supplemental EIR/EIS) under the National Environmental Policy Act (NEPA...
21 CFR 25.52 - Environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Environmental impact statements. 25.52 Section 25... ENVIRONMENTAL IMPACT CONSIDERATIONS Public Participation and Notification of Environmental Documents § 25.52 Environmental impact statements. (a) If FDA determines that an EIS is necessary for an action involving...
Phase 2 fuel efficiency standards for medium- and heavy-duty engines and vehicles : draft EIS.
DOT National Transportation Integrated Search
2015-06-01
This Draft Environmental Impact Statement (Draft EIS) analyzes the environmental impacts of fuel : efficiency standards and reasonable alternative standards for model years 2018 and beyond for medium- : and heavy- duty engines and vehicles that NHTSA...
75 FR 16787 - Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... improve environmental resources in the project area. Rating LO. EIS No. 20090451, ERP No. D-FHW-F40451-FL..., WA, OR and CA. Summary: EPA does not object to the proposed action. Rating LO. EIS No. 20100027, ERP...
77 FR 4318 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
..., Clearwater National Forest Travel Planning Project, Proposes to Manage Motorized and Mechanized Travel.../2012, Contact: Heather Berg (208) 476-4541. EIS No. 20120014, Revised Draft EIS, USFS, MT, East Deer Lodge Valley Landscape Restoration Management Project, To Conduct Landscape Restoration Management...
76 FR 78252 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
..., Rubicon Trail Easement and Resource Improvement Project, Construction and Operation, Right-of-Way Grant...: Andrea Catanzaro (409) 766-6346 EIS No. 20110421, Draft EIS, USFS, CA, Greys Mountain Ecological...--La Crosse Transmission System Improvement Project, Proposed Construction and Operation of a 345...
Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign andmore » domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... DEPARTMENT OF ENERGY Western Area Power Administration Notice of Cancellation of Environmental Impact Statement for the Interconnection of the Hualapai Valley Solar Project, Mohave County, AZ (DOE/EIS... Impact Statement. SUMMARY: The U.S. Department of Energy (DOE), Western Area Power Administration...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park... Service is expanding the scope of the Environmental Impact Statement (EIS) that is being prepared for updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-19
... Draft Feasibility Study; Environmental Impact Statement for the Chatfield Reservoir Storage Reallocation.... Army Corps of Engineers has prepared a Draft Feasibility Report/Environmental Impact Statement (FR/EIS) for the Chatfield Reservoir Storage Reallocation Study, Littleton, Colorado and by this notice is...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
...; Klamath County, Oregon; Marsh Project Environmental Impact Statement AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The USDA, Forest Service, will prepare an environmental impact statement (EIS) for a project called Marsh, in the southwestern portion of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Intent To Prepare an Environmental Impact Statement; US 41 Interstate Conversion Plan, Milwaukee, Waukesha, Washington, Dodge, Fond... Impact Statement (EIS) will be prepared for the proposed interstate conversion of U.S. Highway 41 in...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... Plan/Environmental Impact Statement, Fire Island National Seashore, New York AGENCY: National Park... for a Deer and Vegetation Management Plan, Fire Island National Seashore, New York. SUMMARY: Pursuant... preparing an Environmental Impact Statement (EIS) for a Deer and Vegetation Management Plan at Fire Island...
24 CFR 58.53 - Use of prior environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Use of prior environmental impact... RESPONSIBILITIES Environmental Review Process: Environmental Impact Statement Determinations § 58.53 Use of prior environmental impact statements. Where any final EIS has been listed in the Federal Register for a project...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... Register (65 FR 78464) to prepare an environmental impact statement (EIS) for controlling invasive plants... of completion and distribution for the draft supplemental environmental impact statement (DSEIS) as... the final supplemental environmental impact statement (FSEIS) and draft records of decision (each...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-27
...] Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park AGENCY... National Park Service (NPS) is preparing a Chronic Wasting Disease Management Plan and Environmental Impact Statement (CWD Management Plan/EIS) for Shenandoah National Park, Virginia. Action is needed at this time...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... Actions and To Conduct Public Scoping Meetings AGENCY: National Marine Fisheries Service (NMFS), National... environmental impact statement and conduct public scoping meetings. SUMMARY: NMFS intends to prepare an environmental impact statement (EIS) and to conduct public scoping meetings to comply with the National...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
... Stewardship Plan/Environmental Impact Statement, San Juan Island National Historical Park AGENCY: National... Prairie Stewardship Plan, San Juan Island National Historical Park, Washington. SUMMARY: Pursuant to the... initiating the preparation of an Environmental Impact Statement (EIS) for a Prairie Stewardship Plan, as...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-28
... Environmental Impact Statement: Milwaukee County, Wisconsin AGENCY: Federal Highway Administration (FHWA), DOT... the public that the project limits for the I-94 East-West Corridor Environmental Impact Statement (EIS... CONTACT: Bethaney Bacher-Gresock, Environmental Program Manager, FHWA Wisconsin Division Office, City...
Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-05)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Patricia R.
2002-09-20
Yakima/Klickitat Fisheries Project – Under the Monitoring and Evaluation Program (M&E), the domestication selection research task would be modified to include a hatchery control line, maintained entirely by spawning hatchery-origin fish. The Bonneville Power Administration is funding ongoing studies, research, and artificial production of several salmonid species in the Yakima and Klickitat river basins. BPA analyzed environmental impacts of research and supplementation projects in the Yakima basin in an Environmental Impact Statement (EIS) completed in 1996 (USDOE/BPA 1996), and in the following Supplement Analyses: DOE/EIS-0169-SA-01, completed in May 1999; DOE/EIS-0169-SA-02, completed in August 1999; DOE/EIS-0169-SA-03, completed in 2000; DOE/EIS-0169-SA-04, completedmore » in November 2000. The purpose of this Supplement Analysis is to determine if a Supplemental EIS is needed to analyze the changes proposed in the Monitoring and Evaluation program (#199506325) of the Yakima Klickitat Fisheries Project (YKFP) as reviewed in the FY 2001 Project Proposals for the Columbia River Gorge and Inter-Mountain Provinces, ISRP 2000-9 (December 1, 2000). Modifications to the M&E program are in support of the experimental acclimation, rearing and incubating activities for spring chinook.« less
77 FR 19281 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-30
..., FL, Central and Southern Florida Project, Broward County Water Preserve Areas, Updates Resulting from Policy Changes that occurred since 2007 Civil Works Board Approval, South Florida Water Management... for this project. EIS No. 20120089, Final EIS, USFS, CA, Greys Mountain Ecological Restoration Project...
78 FR 16500 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... and Vegetation Management Project, Comment Period Ends: 04/29/2013, Contact: Marcy Anderson 541-419-0517. EIS No. 20130062, Draft EIS, USFS, NM, Roca Honda Mine Project, Exploration and Mine Development... Seco Riparian Sanctuary Unit Restoration and Pumping Plant/Fish Screen Facility Protection Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
...) Federal joint lead agencies, and the State of California Department of Fish and Game (DFG), acting as the..., Preservation, and Restoration Plan (SMP) Final EIS/EIR. The SMP is a comprehensive plan designed to address the...
76 FR 75543 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Profile Zones (DFPZs), Lassen National Forest, Almanor Ranger District, Plumas County, CA, Comment Period... Treatment Activities, Updated and New Information, Idaho Panhandle National Forests, Priest Lake Ranger... (937) 257-5899. EIS No. 20110403, Draft EIS, USFS, CA, Creeks II Forest Restoration Project, Proposal...
77 FR 37672 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... EIS, NOAA, AS, Fagatele Bay National Marine Sanctuary Management Plan, Implementation, Tutuila Island.... 20120195, Draft EIS, NPS, FL, Fort Matanzas National Monument General Management Plan, Implementation, St... filing documents online and providing feedback on the process. To participate in the pilot, register at...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... Impact Statement (GMP/EIS) for the Memorial in October 2009 and the record of Decision (ROD) was signed.... The 2009 GMP/EIS provided a broad analysis of potential impacts of the expansion of programs and...
77 FR 38801 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...
77 FR 11109 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
...-Native Plant Control Project, Proposes a Forest-Wide Integrated Management Strategy to Control the Spread..., Final EIS, USFS, SD, Steamboat Project, Proposes to Implement Multiple Resource Management Actions... EIS, USFS, WA, South George Vegetation and Fuels Management Project, To Improve Forest Health and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
..., Inc. (SWG-2011-00511) for the proposed approximately 300-turbine offshore wind farm located in the... and operation of the offshore wind farm, associated facilities, and appurtenances and is intended to... EIS on the proposed Baryonyx offshore wind farm which would include the proposed construction of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... completed in 1957 as an integral component of the Los Angeles County Drainage Area system of dams and... several measures including: emergency management preparedness, remote monitoring, increased inspections... Scope of Analysis. The EIS will also evaluate the impacts of alternatives on environmental resources...
15 CFR 921.13 - Management plan and environmental impact statement development.
Code of Federal Regulations, 2011 CFR
2011-01-01
... submitted pursuant to § 921.12, the state may begin draft management plan development and the collection of information necessary for the preparation by NOAA of an EIS. The state shall develop a draft management plan... areas of the Reserve, ranking these areas according to their relative importance, and including a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... Nonregulated Status of Herbicide Resistant Soybeans and Cotton, and Notice of Virtual Public Meeting AGENCY... resistant soybeans and cotton. Issues to be addressed in the EIS include the potential environmental impacts... the Monsanto Company (Monsanto) seeking a determination of nonregulated status for soybean and cotton...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-26
... of Ballona Creek including coastal wetlands. Santa Monica Bay Restoration Commission (SMBRC) is the... Restoration Feasibility Study, Los Angeles County, CA AGENCY: Department of the Army, U.S. Army Corps of.../Environmental Impact Report (EIS/EIR) for the Ballona Creek Ecosystem Restoration Feasibility Study in the...
76 FR 74074 - Final Environmental Impact Statement for the Windy Gap Firming Project, Colorado
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-30
... Chimney Hollow Reservoir, pre-positioning of Colorado-Big Thompson (C-BT) water in the new reservoir, and a new pipeline to convey water to the reservoir from existing C-BT facilities. DATES: Reclamation... (Proposed Action) described in the Final EIS includes: Construction of Chimney Hollow Reservoir (90,000 acre...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-23
..., and the Contra Costa County Flood Control and Water Conservation District (CCCFCWCD) will serve as... be analyzed in depth in the EIS/EIR include project specific and cumulative effects on hydraulics..., cultural resources, recreation, land use, fisheries, water quality, air quality, and transportation. c...
75 FR 21625 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
...: Christopher Worthington 775-635-4000. EIS No. 20100136, Final EIS, USFS, 00, Nebraska National Forests and..., Buffalo Gap National Grassland, Oglala National Grassland, Samuel R. McKelvie National Forest, and the Pine Ridge and Bessey Units of the Nebraska National Forest, Fall River, Custer, Pennington, Jackson...
76 FR 34072 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
.... 20110178, Draft EIS, NRC, FL, Generic--License Renewal of Nuclear Plants Regarding Crystal River Unit 3.... 20110182, Final EIS, WAPA, CA, Rice Solar Energy Project, Proposed 150 megawatt Solar Energy Generating..., Access, Wildlife, Fisheries, Soil and Water, Idaho Panhandle National Forest, St. Joe Ranger District...
76 FR 38650 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
..., Contact: John Rydzik 916-978-6051. EIS No. 20110202, Final EIS, NOAA, 00, Amendment 11 to the Atlantic... (FMP), Establish an Atlantic Mackerel Limited Access Program, Implementation, Review Period Ends: 08/01... Functions and Values, Implementation, Humboldt-Toiyabe National Forest, Lincoln, Nye, and Pine Counties, NV...
76 FR 44000 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-22
..., NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and Transmission...-328-4200. EIS No. 20110233, Draft EIS, BLM, WY, Chokecherry and Sierra Madre Wind Energy Project, Proposes to Construct and Operate a Wind Energy Project, South of Rawlins, Carbon County, WY, Comment...
75 FR 78992 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...--Solar Energy Development in Six Southwestern States, To Establish a New BLM Solar Energy Program applicable to Utility-Scale Solar Energy Development and DOE's Proposed Action to Develop new Program... 01/20/2011. EIS No. 20100339, Final EIS, BLM, CA, Adoption--Genesis Solar Energy Project, Application...
77 FR 41402 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
... Listed or Petitioned Species, Several Counties, Texas, Comment Period Ends: 10/10/2012, Contact: Adam Zerrenner 512-490-0057. EIS No. 20120224, Draft EIS, FHWA, IL, Illiana Corridor Project Tier One... Mountain Restoration Project, Kaibab National Forest, Coconino County, AZ, Comment Period Ends: 08/27/2012...
78 FR 40474 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
..., Draft EIS, USA, TX, Implementation of Energy, Water, and Solid Waste Sustainability Initiatives at Fort... Land Management (BLM) has adopted the Federal Energy Regulatory Commission's FEIS 20100001, filed 01/07.... 20130197, Final EIS, USACE, FL, Everglades Agricultural Area A- 1 Shallow Flow Equalization Basin, Review...
Solar Energy Development PEIS Information Center
skip navigation Solar Energy Development Programmatic EIS Home About the EIS Public Involvement Solar Energy Solar Energy Zones Maps Documents secondary menu News Frequently Asked Questions Glossary E the Programmatic Environmental Impact Statement for Solar Energy Development in Six Southwestern
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
...In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Hassayampa Field Office, Phoenix, Arizona, intends to prepare an Environmental Impact Statement (EIS) which may include discussion of an amendment to the Bradshaw-Harquahala Resource Management Plan (RMP), and by this notice is announcing the beginning of the scoping process to solicit public comments and identify issues.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
...), determined that the proposed project may result in significant impacts to the environment, and that the preparation of an Environmental Impact Statement (EIS) is required. The Applicant proposes to implement a... Environmental Impact Statement for the Proposed Westbrook Project, Corps Permit Application Number SPK-2005...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... environment. Affected Federal, state, or local agencies, affected Indian tribes, and other interested private... Environmental Impact Statement for Update of the Shoreline Management Plan and Supplement to the Master Plan... intent. SUMMARY: The purpose of the Environmental Impact Statement (EIS) is to address alternatives and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... Environmental Impact Statement for General Management Plan for Golden Gate National Recreation Area and Muir... Management Plan for Golden Gate National Recreation Area and Muir Woods National Monument. SUMMARY: In accord... Environmental Impact Statement (Draft EIS) for the updating the General Management Plan (GMP) for Golden Gate...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Notice of Availability for the Draft Environmental Impact Statement for the Gregory Canyon Landfill Project, San Diego County, CA... Draft Environmental Impact Statement (EIS) for the proposed Gregory Canyon Landfill Project in San Diego...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-11
... DEPARTMENT OF DEFENSE Department of the Navy Reopening of Public Comment Period for the Draft Environmental Impact Statement/Legislative Environmental Impact Statement for Renewal of Naval Air Weapons... Weapons Station China Lake public land withdrawal. A Notice of Availability for the Draft EIS/LEIS was...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-05
...; UTU-83067] Notice of Intent To Prepare an Environmental Impact Statement for the Sigurd-Red Butte...) Cedar City Field Office, Cedar City, Utah, intends to prepare an Environmental Impact Statement (EIS... Fishlake National Forests), State of Utah, Millard County, Sevier County, Beaver County, Utah Division of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-22
... (ROW) application from Sierra Pacific Power Company (SPPC), for proposed geothermal energy projects... Environmental Impact Statement for the Salt Wells Energy Projects, Churchill County, NV AGENCY: Bureau of Land... Environmental Impact Statement (EIS) for the Salt Wells Energy Projects and by this notice is announcing its...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... Environmental Impact Statement for the Proposed Replacement General Aviation Airport, Mesquite, Clark County, NV... Environmental Impact Statement (EIS) for a proposed Replacement General Aviation (GA) Airport in Mesquite, Clark... General Aviation (GA) Airport, for the City of Mesquite in eastern Clark County, Nevada. The City [[Page...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-27
... Prepare an Environmental Impact Statement for the Proposed Boardman to Hemingway 500 Kilovolt Transmission..., intend to prepare an Environmental Impact Statement (EIS) for the Boardman to Hemingway (B2H) Project... for construction by IPC between the existing Hemingway substation, located near Melba in Owyhee County...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
...-FF02ENEH00] Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's... the final environmental impact statement (EIS), and final record of decision under the National... implementation of the final Oncor Electric Delivery LLC's Habitat Conservation Plan (HCP). Our decision is to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the... alternative) seeks to allocate limited resources among competing human interests, land uses, and conservation...
77 FR 27771 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... Forest, Custer, Fall River, Lawrence, Meade, and Pennington Counties, SD and Crook and Weston Counties... Improvements Project, Special Use Permit, White River National Forest, Eagle County, CO, Review Period Ends: 06/11/2012, Contact: Don Dressler 970-827-5157. EIS No. 20120142, Draft EIS, USN, 00, Atlantic Fleet...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-17
...; Fox Canyon Cluster Allotment Management Plan Project EIS AGENCY: Forest Service, USDA. ACTION: Notice... preparing an environmental impact statement (EIS) to analyze the effects of changing grazing management in four allotments on the Paulina Ranger District. The Fox Canyon Cluster project area is located...
75 FR 47591 - Environmental Impacts Statements; Notice Of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... Thomas 559-784-1500 ext. 1164. EIS No. 20100292, Final EIS, BLM, CA, Ivanpah Solar Electric Generating System (07-AFC-5) Project, Proposal to Construct a 400-m Megawatt Concentrated Solar Power Tower, Thermal... Generation Station (GGS) Project, Proposes to Modify its Interconnection Agreement, Basin Electric Power...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... Folsom DS/FDR EIS/EIR considered several methods to modify MIAD to achieve Reclamation's risk standards... availability of the Final Supplemental Environmental Impact Statement/Environmental Impact Report (EIS/EIR). SUMMARY: Pursuant to the National Environmental Policy Act and the California Environmental Quality Act...
24 CFR 50.42 - Cases when an EIS is required.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Cases when an EIS is required. 50.42 Section 50.42 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY Environmental Impact Statements...
24 CFR 50.42 - Cases when an EIS is required.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Cases when an EIS is required. 50.42 Section 50.42 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY Environmental Impact Statements...
24 CFR 50.42 - Cases when an EIS is required.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Cases when an EIS is required. 50.42 Section 50.42 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY Environmental Impact Statements...
24 CFR 50.42 - Cases when an EIS is required.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Cases when an EIS is required. 50.42 Section 50.42 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY Environmental Impact Statements...
24 CFR 50.42 - Cases when an EIS is required.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Cases when an EIS is required. 50.42 Section 50.42 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY Environmental Impact Statements...
36 CFR 907.8 - Actions that normally require an EIS.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Actions that normally require an EIS. 907.8 Section 907.8 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT... prepare or have prepared the environmental impact statement. To assist in determining if a proposal or...
77 FR 9652 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... Road-Related Impacts to Wildlife, Fish, Soil, and Water Resources and Restoration of 2010 Forest Plan..., Amendment 18A to the Fishery Management Plan for the Snapper-Grouper Fishery of the South Atlantic Region...-9235. EIS No. 20120034, Draft EIS, USFS, CA, Harris Vegetation Management Project, To Improve Forest...
32 CFR 651.41 - Conditions requiring an EIS.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.41... of hazardous or toxic materials that may have significant environmental impact. (i) Be highly... 32 National Defense 4 2014-07-01 2013-07-01 true Conditions requiring an EIS. 651.41 Section 651...
32 CFR 651.41 - Conditions requiring an EIS.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.41... of hazardous or toxic materials that may have significant environmental impact. (i) Be highly... 32 National Defense 4 2012-07-01 2011-07-01 true Conditions requiring an EIS. 651.41 Section 651...
32 CFR 651.41 - Conditions requiring an EIS.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Environmental Impact Statement § 651.41... of hazardous or toxic materials that may have significant environmental impact. (i) Be highly... 32 National Defense 4 2013-07-01 2013-07-01 false Conditions requiring an EIS. 651.41 Section 651...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... development needs for the airport. HAS has determined that reevaluation of the Airport Master Plan (AMP.... Based on the results of the AMP, the airfield improvements being analyzed in the EIS included the... that additional planning work is necessary to ensure that the assumptions used in the AMP remain valid...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... the analysis in the Draft EIS. Each of the public meetings will include an open house information... review at the following public libraries: 1. Multnomah County Central Library, 801 Southwest 10th Avenue, Portland, Oregon 97205. 2. Boardman Branch of the Oregon Trail Library District, 200 South Main Street...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-05
... uses, livestock grazing, potash production, and oil and gas development. Interest in oil, gas, and... currently identified by a BLM interdisciplinary team include the following: air quality and climate change... single environmental impact statement (EIS) to consider leasing for oil and gas and potash on about 783...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... scope of the action alternative which include acreage, water supply, and general site locations would... authorized boundary with a surface water supply as part of continued phased development of the CBP. The... alternative impacts considered in the Draft EIS. Two water supply options are being considered that would use...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-02
... construction, operation, and maintenance of a wind energy facility up to 160 megawatt (MW). The EIS will... Reservation. The proposed facility is anticipated to be comprised of between 53 and 106 wind turbines with a... of wind turbine). The facility would include: turbines anchored to concrete foundations approximately...
30 CFR 285.111 - When and how does MMS charge me processing fees on a case-by-case basis?
Code of Federal Regulations, 2011 CFR
2011-07-01
... application or request and it will have a unique processing cost, such as the preparation of an Environmental Assessment (EA) or Environmental Impact Statement (EIS). (1) Processing costs will include contract oversight... costs. (b) We will assess the ongoing processing fee for each individual application or request...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-29
... concern so far identified that the EIS will address include soils and geology, air quality, water supply, wastewater and storm water, biological resources, traffic and transportation, cultural and historic resources... Environmental Quality Regulations (40 CFR 1500 et seq.) and the Department of the Interior Regulations (43 CFR...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
.... Surrounding land uses include residential, commercial, recreational, and industrial uses. To the north and... School. To the south are industrial uses. Across Texas Street to the east are multi-family residential, single-family residential, and industrial uses. The obsolete buildings that make up the site are in need...
75 FR 57018 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-17
... 09/10/2010 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air Act... . Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make..., IN, Comment Period Ends: 10/28/2010, Contact: Janice Osadczuk 317-226-7486. Revision to FR Notice 07...
Summary Analysis: Hanford Site Composite Analysis Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nichols, W. E.; Lehman, L. L.
2017-06-05
The Hanford Site’s currently maintained Composite Analysis, originally completed in 1998, requires an update. A previous update effort was undertaken by the U.S. Department of Energy (DOE) in 2001-2005, but was ended before completion to allow the Tank Closure & Waste Management Environmental Impact Statement (TC&WM EIS) (DOE/EIS-0391) to be prepared without potential for conflicting sitewide models. This EIS was issued in 2012, and the deferral was ended with guidance in memorandum “Modeling to Support Regulatory Decision Making at Hanford” (Williams, 2012) provided with the aim of ensuring subsequent modeling is consistent with the EIS.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-21
... consumption. Sub-alternative Al would use PV technology instead of solar thermal technology to reduce water...; AZA34187] Notice of Availability of the Final Environmental Impact Statement for the Proposed Sonoran Solar... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Sonoran Solar Energy Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Point Molate Resort and Casino for the Guidiville Band of the Pomo Indians, Contra Costa County... Impact Statement (EIS) for the BIA Federal action of approving the fee-to- trust transfer and casino...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
...; UTU-83067] Notice of Availability of Final Environmental Impact Statement for the Sigurd to Red Butte... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Sigurd to Red Butte No. 2--345...; Utah School and Institutional Trust Lands Administration; Millard, Sevier, Beaver, Iron, and Washington...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
...), for proposed geothermal energy projects covering a combined area of approximately 24,152 acres in the... Environmental Impact Statement for the Salt Wells Energy Projects, Churchill County, NV AGENCY: Bureau of Land... Environmental Impact Statement (EIS) for the Salt Wells Energy Projects and by this notice is announcing the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-04
... Impact Statement for the Proposed K Road/Moapa Band of Paiute Indians Photovoltaic Solar Facility, Clark... and operate an up-to 350 MW solar photovoltaic electricity generating facility on approximately 2,000... preparing an environmental impact statement (EIS) for the proposed Moapa Band of Paiute Indians Solar...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
... Environmental Impact Statement for the Silver Strand Training Complex AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY: A notice of availability was published by the U.S. Environmental Protection... (SSTC) Draft Environmental Impact Statement (EIS). The public review period ended on March 8, 2010. This...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... Impact Statement for the Silver Strand Training Complex, San Diego, CA; Correction AGENCY: Department of... Impact Statement for the Silver Strand Training Complex, San Diego, CA. The document contained incorrect.... Kent Randall, SSTC EIS Project Manager, 1220 Pacific Highway, Building 1, 5th Floor, San Diego, CA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
.... Requests to speak at any one or more public scoping meeting(s) should be received by Dr. Jerry Pell at the... Statement and To Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement... an Environmental Impact Statement (EIS) and to conduct Public Scoping Meetings; Notice of Floodplains...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
...-166318] Notice of Availability of the Final Environmental Impact Statement for the Lost Creek Uranium In Situ Recovery Project in Sweetwater County, WY AGENCY: Bureau of Land Management, Interior. ACTION... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Lost Creek Uranium In Situ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-17
... maintenance and storage needs of an expanded fleet of light rail vehicles identified in the Sound Transit 2... Environmental Impact Statement for a Light Rail Operations and Maintenance Satellite Facility, King and... planning to prepare an Environmental Impact Statement (EIS) for Sound Transit's proposed new Light Rail...
75 FR 81640 - Record of Decision
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... on the Final Environmental Impact Statement/Cape Hatteras National Seashore Off-Road Vehicle... Environmental Impact Statement (Final EIS) for the Cape Hatteras National Seashore (Seashore) Off-Road Vehicle... temporary ORV use restrictions, for such things as ramp maintenance, resource and public safety closures...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... involve the construction, operation, and maintenance of infrastructure upgrades, expansions, and... Road over the Santa Margarita River (Stuart Mesa Bridge). A Notice of Intent to prepare this EIS was... Road, Fallbrook, California 92028. A copy of the Draft EIS will be made available upon written request...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Notice of Intent, the lead agencies, in cooperation with the applicant (if not a lead agency), will begin... at the local level. (c) The draft EIS shall be prepared by the lead agencies, in cooperation with the applicant (if not a lead agency). The draft EIS shall evaluate all reasonable alternatives to the action and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-15
... Facilities Engineering Command Northwest, 1101 Tautog Circle Suite 203, Silverdale, Washington, 98315-1101... Burt, NWSTF Boardman EIS Project Manager, 1101 Tautog Circle Suite 203, Silverdale, Washington, 98315-1101. In addition, comments may be submitted online at http://www.NWSTFBoardmanEIS.com during the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-16
...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...
75 FR 13275 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Dimmett 208-382- 7400. EIS No. 20100083, Draft EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction and Operation of Two Concentrated Solar Power Plant Facilities, Right-of-Way Application on Public..., Blythe Solar Power Project (09- AFC-6), Application for Right-of Way Grant to Construct and Operate, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... Final EIS NOA and use them to inform the Records of Decision. Those individuals wishing to submit... general information regarding the DOE NEPA process, contact Carol Borgstrom, Director, Office of NEPA... development. Through the Final Programmatic EIS, the BLM is considering replacing elements of its existing...
76 FR 7844 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
.... Rassbach 509-522-6290. Amended Notices EIS No. 20100444, Final EIS, BLM, NV, Tonopah Solar Energy Crescent Dunes Solar Energy Project, a 7,680-Acre Right-of-Way (ROW) on Public Lands to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, NV, Contact: Julie Ann Smith 202-586-7668. Revision to...
75 FR 14594 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-26
... Forest, Mono County, CA and Lyon, Douglas, and Mineral Counties, NV, Wait Period Ends: 04/26/2010.../ 2010, Contact: Douglas Gober, 208-476-4541. EIS No. 20100089, Draft EIS, STB, AK, Port MacKenzie Rail..., Richland, Benton County, WA, Comment Period Ends: 05/03/2010, Contact: Mary Beth Burandi, 888-829- 6347...
76 FR 37111 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
...-5410 EIS No. 20110197, Final EIS, NRC, AK, Lost Creek In-Situ Uranium Recovery (ISR) Project, Proposal to Construct, Operate, Conduit Aquifer Restoration, and Decommission an In-Situ Recovery (ISR.../13/2011 Through 06/17/2011 Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the...
75 FR 52736 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
... . EIS No. 20100337, Final EIS, NRC, WY, Moore Ranch In-Situ Uranium Recovery (ISR) Project, Proposal to Construct, Operate, Conduct Aquifer Restoration, and Decommission an In-Situ Recovery (ISR) Facility, NUREG... Through 08/20/2010. Pursuant to 40 CFR 1506.9. Notice In accordance with Section 309(a) of the Clean Air...
77 FR 67362 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-09
.... 20120358, Draft Supplement, BOEM, 00, Gulf of Mexico Outer Continental Shelf (OCS) Oil and Gas Lease Sales...: Aaron O. Allen 805-585-2148. EIS No. 20120360, Final EIS, BLM, 00, PROGRAMMATIC--Allocation of Oil Shale and Tar Sands Resources on Lands Administered, Propose to Amend 10 Land Use Plans in Colorado, Utah...
77 FR 65379 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
..., Contact: Carlos Lazo 916-557-5158. EIS No. 20120339, Final EIS, USACE, AK, Alaska Stand Alone Gas Pipeline, Construction and Operation of a 737 mile Pipeline to Transport Supply of Natural Gas and Natural Gas Liquids... National Forest Oil and Gas Leasing, Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... DEPARTMENT OF ENERGY [OE Docket No. PP-362] Notice of Availability for the Draft Environmental.... SUMMARY: The U.S. Department of Energy (DOE) announces the availability of the ``Draft Environmental... EIS. The Draft EIS evaluates the environmental impacts of DOE's proposed Federal action of issuing a...
75 FR 10253 - Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... concerns about storage, transportation and disposal of hazardous waste and radioactive wastes. EPA... wastes will need to be addressed as the project progresses. Rating EC2. EIS No. 20090378, ERP No. D-COE.... EIS No. 20100008, ERP No. D-GSA-F65079-00, International Falls Land Port of Entry Improvements Study...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Termination of... Aviation Administration (FAA), Department of Transportation (DOT). ACTION: Notice. SUMMARY: The Federal Aviation Administration (FAA) announces its decision to terminate the Environmental Impact Statement (EIS...
77 FR 30046 - Environmental Impact Statement: Wiscasset and Edgecomb, Lincoln County, ME
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-21
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Wiscasset and Edgecomb, Lincoln County, ME AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Intent to Terminate (Withdraw) EIS. SUMMARY: The FHWA is issuing this notice to advise the...
75 FR 54220 - Environmental Impact Statement: Skowhegan and Madison, Somerset County, ME
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Skowhegan and Madison, Somerset County, ME AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Intent to Terminate (Withdraw) EIS. SUMMARY: The FHWA is issuing this notice to advise the...
44 CFR 10.9 - Preparation of environmental assessments.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Conclusion of whether to prepare an environmental impact statement. (c) Public participation. The Regional... to prepare an EIS. The Regional Administrator shall prepare an environmental impact statement for all... No Significant Impact. If the Regional Administrator determines on the basis of the environmental...
44 CFR 10.9 - Preparation of environmental assessments.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Conclusion of whether to prepare an environmental impact statement. (c) Public participation. The Regional... to prepare an EIS. The Regional Administrator shall prepare an environmental impact statement for all... No Significant Impact. If the Regional Administrator determines on the basis of the environmental...
44 CFR 10.9 - Preparation of environmental assessments.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Conclusion of whether to prepare an environmental impact statement. (c) Public participation. The Regional... to prepare an EIS. The Regional Administrator shall prepare an environmental impact statement for all... No Significant Impact. If the Regional Administrator determines on the basis of the environmental...
44 CFR 10.9 - Preparation of environmental assessments.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Conclusion of whether to prepare an environmental impact statement. (c) Public participation. The Regional... to prepare an EIS. The Regional Administrator shall prepare an environmental impact statement for all... No Significant Impact. If the Regional Administrator determines on the basis of the environmental...
Final Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1996-01-01
The Final Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA!s participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
Draft Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1995-01-01
The Draft Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA's participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop a human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
X-33 Environmental Impact Statement: A Fast Track Approach
NASA Technical Reports Server (NTRS)
McCaleb, Rebecca C.; Holland, Donna L.
1998-01-01
NASA is required by the National Environmental Policy Act (NEPA) to prepare an appropriate level environmental analysis for its major projects. Development of the X-33 Technology Demonstrator and its associated flight test program required an environmental impact statement (EIS) under the NEPA. The EIS process is consists of four parts: the "Notice of Intent" to prepare an EIS and scoping; the draft EIS which is distributed for review and comment; the final ETS; and the "Record of Decision." Completion of this process normally takes from 2 - 3 years, depending on the complexity of the proposed action. Many of the agency's newest fast track, technology demonstration programs require NEPA documentation, but cannot sustain the lengthy time requirement between program concept development to implementation. Marshall Space Flight Center, in cooperation with Kennedy Space Center, accomplished the NEPA process for the X-33 Program in 13 months from Notice of Intent to Record of Decision. In addition, the environmental team implemented an extensive public involvement process, conducting a total of 23 public meetings for scoping and draft EIS comment along with numerous informal meetings with public officials, civic organizations, and Native American Indians. This paper will discuss the fast track approach used to successfully accomplish the NEPA process for X-33 on time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
This Final Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales [Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)]. This document includes the purpose and background of the proposed actions, the alternatives, the descriptions of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
... to 100 1.5 megawatt (MW) to 3 MW wind turbine generators with a nameplate capacity of 250 MW of power... Intent to Prepare an Environmental Impact Statement for the Quaking Aspen Wind Energy Project, Wyoming... Statement (EIS) for the Quaking Aspen Wind Energy Project (Quaking Aspen). By this notice, BLM is: (1...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-05
... Environmental Impact Statement for the Proposed RES Americas Moapa Solar Energy Center, Clark County, Nevada... environmental impact statement (DEIS) for the proposed RES Americas Moapa Solar Energy Center on the Moapa River... Progress and on the following Web site: www.MoapaSolarEnergyCenterEIS.com . In order to be fully considered...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-20
... Statement for the NextLight Renewable Power, LLC, Silver State Solar Project, Clark County, NV AGENCY... Statement (EIS) for the Silver State Solar Project, Clark County, Nevada, and by this notice is announcing its availability. DATES: The BLM will not issue a final decision on the Silver State Solar Project for...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-05
...; HAG10-0008] Notice of Intent To Prepare an Environmental Impact Statement for the Vantage to Pomona... Yakima Training Center (YTC) intend to prepare an Environmental Impact Statement (EIS) for the Vantage to.... ADDRESSES: You may submit comments or resource information related to the Vantage to Pomona Heights 230 kV...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the... all work on an Environmental Impact Statement (EIS) for the BIA Federal action of approving a 70.277 acre fee-to-trust transfer and casino project located within Do[ntilde]a Ana County, New Mexico. DATES...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... decommission an up to 750 megawatt (MW) photovoltaic solar energy generation facility and necessary ancillary... LVRWB10B3980] Notice of Availability of a Draft Environmental Impact Statement for the Proposed McCoy Solar... Impact Statement (EIS) for McCoy Solar, LLC's right-of-way (ROW) application for the McCoy Solar Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-26
... of the solar field. A heat transfer fluid is heated as it passes through the receiver tower and is... Statement for the Tonopah Solar Energy Crescent Dunes Solar Energy Project, Nye County, NV AGENCY: Bureau of... Statement (EIS) for the Crescent Dunes Solar Energy Project, Nye County, Nevada, and by this notice is...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-18
... Environmental Impact Statement for Effects of Oil and Gas Activities in the Arctic Ocean AGENCY: National Marine... Environmental Impact Statement (DEIS) for the Effects of Oil and Gas Activities in the Arctic Ocean.'' Based on... Web page at: http://www.nmfs.noaa.gov/pr/permits/eis/arctic.htm . FOR FURTHER INFORMATION CONTACT...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-23
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Environmental Impact Statement for Oil and Gas... necessary for preparing an Environmental Impact Statement (EIS) that evaluates proposed oil and gas... consists of drilling up to 4,899 oil and/or natural gas wells over the next 15 years, with a life- of...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENVIRONMENTAL RESPONSIBILITIES Environmental Review Process: Procedures for Draft, Final and Supplemental... responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental... may request waivers from the time requirements specified for the draft and final EIS as prescribed in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... Dam. The project will consist of up to 335 wind turbine generators (WTGs). Construction may consist of... County Wind Farm Project, Mohave County, AZ AGENCY: Bureau of Land Management, Interior. ACTION: Notice....gov/az/st/en/prog/energy/wind/mohave.html . In order to be included in the Draft EIS, all comments...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-14
...-FXRS1266066CCP0S3-123] Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, MT... final comprehensive conservation plan (CCP) and final environmental impact statement (EIS) for Charles M....gov . Include ``Request copy of Charles M. Russell NWR ROD'' in the subject line of the message. U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-29
... additional alternatives. Alternative A includes full-scale project development of a 450 Megawatt solar PV... the Oro Verde Solar Project at Edwards Air Force Base and County of Kern, CA AGENCY: Department of the... with the development of the Oro Verde Solar Project (OVSP) on Edwards AFB. The OVSP is a solar...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... Norfolk Airport Authority (NAA), the owner and operator of the airport. The additional planning effort by NAA has modified the project purpose and need and refined various project elements, including the need... decision to prepare a federal EIS primarily on NAA's proposal to construct a new Runway 5R/23L in parallel...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...
Sonic Boom Assessment for the Crew Exploration Vehicle
NASA Technical Reports Server (NTRS)
Herron, Marissa
2007-01-01
The Constellation Environmental Impact Statement (Cx EIS) requires that an assessment be performed on the environmental impact of sonic booms during the reentry of the Crew Exploration Vehicle (CEV). This included an analysis of current planned vehicle trajectories for the Crew Module (CM) and the Service Module (SM) debris and the determination of the potential impact to the overflown environment.
Report to Congress on Sustainable Ranges, 2009
2009-05-01
and undersea spaces under the administration of other nations with their permission and international areas. In each case, DoD must deal with a... undersea presentations designed for live or simulated weapons engagement. 6. Threats—Various physical and simulated threat presentations such as...Statements (EIS) are complete. The remaining Tactical Training Theater Assessment and Planning (TAP) program including the East Coast Undersea Warfare
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... and H.P. Wright Library Branch. The Final EIS/EIR is available at the Corps' Web site: http://www.spl... includes a draft general conformity determination (see Section 3.2, Section 4.7 and Appendix D.7), pursuant to Section 176(c) of the Clean Air Act. A general conformity determination is necessary because...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... Facilities Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30... Facilities Engineering Command Southeast, NAS Key West Air Operations EIS Project Manager, P.O. Box 30, Building 903, NAS Jacksonville, FL 32212 or electronically via the project Web site ( http://www.keywesteis...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... will be issued after August 27, 2012. The Final EIS is not open for public comment. FOR FURTHER... after requests for an extension were received. Open house and public comment meetings were held between... EIS are available for review at the following public libraries and schools: Harold Kaveolook School...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
... times and locations: 05 December 2011 Anchorage, AK Open House 4-6 p.m. Loussac Library........ Public... Draft EIS: The Draft EIS is available for review at the following public libraries and schools: a. Harold Kaveolook School, Kaktovik, AK b. Nuiqsut Trapper School, Nuiqsut, AK c. Tuzzy Consortium Library...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-22
... Water Act permit application for the proposed `Regional Watershed Supply Project' submitted in 2008 by a... to supply up to 250,000 acre feet of water annually to various municipal and agricultural entities in... the EIS process started in 2009, it was understood that the project purpose was water supply, so all...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-08
.... Accordingly, comments submitted in the EIS process also informed RUS's decision making in the Section 106... of Availability of a Record of Decision. SUMMARY: The Rural Utilities Service (RUS) has issued a Record of Decision (ROD) for the Environmental Impact Statement (EIS) related to providing financial...
78 FR 54893 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
... make public its comments on EISs issued by other Federal agencies. EPA's comment letters on EISs are... Period Ends: 10/21/2013, Contact: Ken Corey 760-322-2070. EIS No. 20130257, Final EIS, BLM, NV... and Queens Counties, NY, Contact: Gary Kassof 212-668-7021. The U.S. Coast Guard has adopted the U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-29
... new concept are not significant and do not warrant an EIS. Recommendations for improvements along this... with several concepts derived from previous planning efforts. Then a wide range of route options were...) technology such as closed caption television cameras, speed detectors, and other hardware and software...
ERIC Educational Resources Information Center
Bruns, Deborah A.; LaRocco, Diana J.; Sharp, Olga L.; Sopko, Kim Moherek
2017-01-01
In 2015, the Division for Early Childhood of the Council for Exceptional Children released a position statement on leadership in early intervention and early childhood special education (EI/ECSE). Division for Early Childhood emphasized the importance of developing and supporting high-quality leadership within and across all levels of EI/ECSE…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-05
... the potential environmental effects associated with the introduction of two additional EA-18G Growler... CONTACT: EA-18G EIS Project Manager (Code EV21/ SS); Naval Facilities Engineering Command (NAVFAC... request should be submitted to: EA-18G EIS Project Manager (Code EV21/SS); Naval Facilities Engineering...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
....HAG11-0127] Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact... Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the Baker... conditions, and changes in resource management practices since the Baker RMP of 1989. The Draft RMP/EIS was...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... Final EIS for the Leasing and Underground Mining of the Greens Hollow Federal Coal Lease Tract (UTU... Mining of the Greens Hollow Federal Coal Lease Tract UTU-84102. Supplemental analyses are required to... mining methods, with foreseeable access from existing adjacent leases. The Forest Service and BLM have...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
.... SUMMARY: Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 United States... proposed action is to improve security, safety, and traffic flow into and on the military base. An EIS must... concerns related to the ECPs and existing roadway network where State Route 444 separates the Kittyhawk...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... to do so. During the first hour, the public may review information materials and speak informally... Elemental Mercury Environmental Impact Statement and Notice of Public Hearings AGENCY: Department of Energy...-0423D, ``Draft Mercury Storage EIS'' or ``Draft EIS'') for public review and comment during a public...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... studies that are underway. 5. Scoping Process: The Corps and County Parks will jointly conduct a series of... development of the EIS/EIR and associated technical studies are being completed to determine the Agency... Association of Governments (SANDAG). The EIR/EIS is currently evaluating three alternative restoration designs...
36 CFR 907.8 - Actions that normally require an EIS.
Code of Federal Regulations, 2011 CFR
2011-07-01
... proposals may significantly affect the environment and therefore require an environmental impact statement... performed an environmental assessment to determine if a proposal requires an environmental impact statement. However, it may be readily apparent that a proposed action will have a significant impact on the...
36 CFR 907.8 - Actions that normally require an EIS.
Code of Federal Regulations, 2010 CFR
2010-07-01
... proposals may significantly affect the environment and therefore require an environmental impact statement... performed an environmental assessment to determine if a proposal requires an environmental impact statement. However, it may be readily apparent that a proposed action will have a significant impact on the...
A study of the review and comment phase of the draft environmental impact statement.
DOT National Transportation Integrated Search
1974-01-01
Since the enactment of the National Environmental Policy Act in 1969, there has been considerable change in the efficiency of the preparation and distribution of environment a impact statements (EIS). This study was an evaluation of the review and co...
76 FR 36613 - Environmental Impact Statement; Nueces County, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-22
... County, TX AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Intent (NOI). SUMMARY... (TxDOT) are issuing this notice to advise the public that an environmental impact statement (EIS) will...--Texas Division, 300 East 8th Street, Austin, Texas 78701. Telephone: 512-536-5960. SUPPLEMENTARY...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-26
... Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management, Interior... amendment and final environmental impact statement (EIS) for the McCoy Solar Energy Project (project)--a photovoltaic solar electricity generation [[Page 76068
Draft Environmental Impact Statement for the Ulysses Mission (Tier 2)
NASA Technical Reports Server (NTRS)
1990-01-01
This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Ulysses spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special(PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG). The potential effects considered in this EIS include risks of air and water quality impacts, local land area contamination, adverse health and safety impacts, the disturbance of biotic resources, impacts on wetland areas or areas containing historical sites, and socioeconomic impacts. Intensive analysis of the possible accidents associated with the proposed action are underway and preliminary results indicate small health or environmental risks. The results of a Final Safety Analysis Report will be available for inclusion into the final EIS.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
... DEPARTMENT OF ENERGY Western Area Power Administration Notice of Cancellation of Environmental Impact Statement for the Proposed Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, SD (DOE/EIS-0437) AGENCY: Western Area Power Administration, DOE. ACTION: Notice of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... geothermal unit, which is currently providing energy sufficient to power three operating geothermal plants... the Casa Diablo IV Geothermal Development Project, CA AGENCY: Bureau of Land Management, Interior... Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-08
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement..., Sacramento County, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability and public.... The preliminary design concepts being considered in the Draft EIS/EIR are one three-story building or...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... Impact Statement for Wallowa-Whitman National Forest Invasive Plants Treatment AGENCY: Forest Service... USDA Forest Service will prepare a Supplement to the Wallowa-Whitman National Forest Invasive Plants Treatment Final Environmental Impact Statement (EIS) to address deficiencies identified by Judge Simon...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMR-YELL-12081; PPWONRADE2, PMP00EI05.YP0000] Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park AGENCY: National Park Service, Interior. ACTION: Notice of Availability. SUMMARY: Pursuant to the National Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
...] Draft Environmental Impact Statement for Alabama Beach Mouse General Conservation Plan for Incidental... future incidental take applications. The take would affect the federally endangered Alabama beach mouse... GCP and the dEIS. These documents analyze the take of the Alabama beach mouse incidental to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
.../Legislative Environmental Impact Statement (EIS/LEIS) to evaluate the potential environmental effects... allow the DoN to continue defense-related research, development, test and evaluation (RDT&E) and... high hazard training area for aerial gunnery, rocketry, electronic warfare and countermeasures, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
... DEPARTMENT OF ENERGY Extension of the Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement AGENCY: Department of Energy. ACTION: Extension of the public... the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS...
78 FR 19261 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-29
... No. 20130073, Draft Supplement, NRC, WY Ross In-Situ Leach Recovery (ISR) Project, Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities, Comment Period Ends... project. EIS No. 20130075, Draft Supplement, NMFS, AK, Effects of Oil and Gas Activities in the Arctic...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-10
... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Intent To Prepare an Environmental Impact Statement for Northwest Aggregates' Previously Authorized Replacement of an Existing Barge... alternatives, and the depth to which the various alternatives will be evaluated in the EIS. The Corps has...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
..., GSA, as the operational Joint Lead Agency, announces its Notice of Intent (NOI) to prepare an EIS for... York. The US Department of Homeland Security (DHS) will act as a Joint Lead Agency in ongoing...-Action Alternative''). The Action Alternative will be further refined into a series of reasonably...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-01
...] Charles M. Russell National Wildlife Refuge and UL Bend National Wildlife Refuge, Montana AGENCY: Fish and... conservation plan (CCP) and environmental impact statement (EIS) for Charles M. Russell and UL Bend National... are extending the comment period for review of the draft CCP and EIS for Charles M. Russell NWR and UL...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-26
... Administration (FTA), as the lead federal agency, and the Chicago Transit Authority (CTA) published a Notice of... interested parties that the EIS will no longer be a Tier 1 EIS as originally proposed. The methodology and... analysis are available on the CTA Web site www.transitchicago.com/rpmproject . The CTA operates the rapid...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-14
... the Chicago, IL to St. Louis, MO High Speed Rail Program Corridor AGENCY: Federal Railroad... (EIS) for the Chicago, IL to St. Louis, MO High Speed Rail Corridor Program in compliance with the... Joliet and St. Louis to support additional passenger trains. The EIS will consider increasing the number...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... preparation of an Environmental Assessment (EA) or Environmental Impact Statement (EIS), absent extraordinary..., 972-73 (S.D. Ill. 1999), aff'd, 230 F.3d 947, 954-55 (7th Cir. 2000). For the reasons set out in the... of actions are categorically excluded and do not require the preparation of an EA or EIS because they...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... evaluation of relevant new species information and hydrological data. The ERTP Draft EIS will evaluate the... alternative and actual data collected since the May 2002 FEIS. The IOP was intended to be continued until the... agency in the preparation of the Draft EIS. The Corps is in close coordination with the FWS. The Corps...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-03
... of Availability of the Draft Environmental Impact Statement (Draft EIS) and Announcement of Public..., cultural, and socioeconomic effects of the proposed alternatives. DATES: Written comments on the Draft EIS will be accepted through March 22, 2010. A public information meeting will be held from 5 p.m. to 7 p.m...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-29
...-Cow Creek Hydroelectric Project (FERC Project No. 606-027). In addition to or in lieu of sending... comments on the Draft EIS. The time and location of this public meeting is as follows: Kilarc-Cow Creek... application for the Kilarc-Cow Creek Project. The Draft EIS was issued and publicly noticed on June 22, 2010...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
... Allocation of Oil Shale and Tar Sands Resources on Lands Administered by the Bureau of Land Management in... to prepare a Programmatic EIS for Allocation of Oil Shale and Tar Sands Resources on Lands... following methods: Web site: http://blm.gov/st5c . Mail: BLM Oil Shale and Tar Sands Resources Leasing...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... approximately 350 acres and would include a three- berth, deep-water wharf. The proposed wharf would be 3,000 feet long and 105 feet wide, with access to suitably deep water provided by an approximately 1,100 foot... and at the Web site www.eisgatewaypacificwa.gov or can be requested by contacting the Corps, Seattle...
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-10-01
This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deepmore » hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains written public comments and hearing board responses and reports offered on the draft statement.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
... comments related to the Hycroft Mine Expansion Draft EIS by any of the following methods: Web site: www.blm..., Nevada 89445, Attn. Kathleen Rehberg. Copies of the Hycroft Mine Expansion Draft EIS are available in the... hours. The FIRS is available 24 hours a day, 7 days a week, to leave a message or question with the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
...), Clark County, NV AGENCY: U.S. Federal Highway Administration (FHWA), DOT. ACTION: Notice of Withdrawal of the Notice of Intent to prepare an EIS for the improvements to I-515 in Clark County, Nevada... improvements to I-515 in the cities of Las Vegas and Henderson, Clark County, NV and in that portion of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2014 CFR
2014-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2012 CFR
2012-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
Code of Federal Regulations, 2013 CFR
2013-07-01
... OF THE URBAN DEVELOPMENT ACTION GRANT PROGRAM § 801.6 Coordination with requirements under the... Policy Act apply to the effect that the project will have on the human environment. To the extent that... Environmental Impact Statement (EIS) subject to the time requirements for a draft and final EIS, in which case...
75 FR 44044 - Environmental Impact Statements: National Summary of Rescinded Notices of Intent
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-27
... rescoped and now meets the criteria for an EA. In Minnesota, the Tier 1 EIS 33rd Street Corridor between TH 15 and TH 10 in Sherburne and Stearns Counties has been reduced in scope and now meets the criteria.... Mary's Counties. MN Tier I EIS--33rd Street 12/26/2002 1/7/2010 Corridor between TH 15 and TH 10...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... time period. It also examines potential impacts to surrounding lands and/or local communities. In.... Adverse impacts to other resource areas were negligible or minor. The Final EIS is available at local... Impact Statement (FEIS) for Training Range and Garrison Support Facilities Construction and Operation at...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... Management Plan/ Environmental Impact Statement for Effigy Mounds National Monument, Iowa AGENCY: National... Protection Agency. Public meetings will be held during the 60-day review period on the GMP/EIS in the Harpers... experience, to the socioeconomic environment, and to monument operations and facilities. The preferred...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... amended, the Bureau of Land Management (BLM), Battle Mountain District, Mount Lewis Field Office, Battle Mountain, Nevada, has prepared a Draft Supplemental Environmental Impact Statement (EIS) for the Cortez... meetings in Crescent Valley and Battle Mountain, Nevada. The BLM will announce future meetings or hearings...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
..., the Bureau of Land Management (BLM), Battle Mountain District, Mount Lewis Field Office, Battle Mountain, Nevada, intends to prepare a Supplemental Environmental Impact Statement (EIS) for the Cortez... Cortez Hills Expansion Project are available at the BLM Battle Mountain District Office, 50 Bastian Road...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-19
...Light Renewable Power, LLC, Silver State Solar Project Environmental Impact Statement AGENCY: Bureau of... State Solar Project Environmental Impact Statement (EIS). The Department of the Interior Secretary...-way (ROW) authorization to construct, operate, maintain and decommission a 400-megawatt (MW) solar...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... Environmental Impact Statement, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended, and the... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-31
... an Environmental Impact Statement for the Sacramento-San Joaquin Delta Islands and Levees Feasibility... Sacramento-San Joaquin Delta Islands and Levees Feasibility Study (Delta Study). The EIS will be prepared in... environmental analysis should be received at (see ADDRESSES) by March 15, 2013. ADDRESSES: Written comments...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-07
... Availability of the Draft Environmental Impact Statement for the Continental Divide-Creston Natural Gas... Continental Divide-Creston Natural Gas Development Project, and by this notice is announcing the opening of... comments on the Continental Divide-Creston Natural Gas Development Project Draft EIS within 45 days...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... Transmission Company; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Apex...) has prepared a draft environmental impact statement (EIS) for the Apex Expansion Project proposed by... the proposed project would have some adverse environmental impact; however, these impacts would be...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-30
... geothermal energy testing and development. The Final EIS also analyzes the potential environmental impacts of... facilitate appropriate development of geothermal, solar, and wind energy in the REEA and make land use plan... Availability of the Final Environmental Impact Statement for the West Chocolate Mountains Renewable Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-13
... decommission a solar photovoltaic electricity generating facility with a proposed output of 150 megawatts and a... CACA 49491] Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact...) Plan Amendment and Final Environmental Impact Statement (EIS) for the Desert Harvest Solar Project and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
..., USDA. ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS). SUMMARY: The Forest Service will prepare an environmental impact statement on a proposal to use multiple vegetation treatments... that reduces potential for high severity wildfire near at-risk communities and in the wildland-urban...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... for Improvements to the Calexico West Port of Entry, Calexico, CA AGENCY: Public Buildings Service... Impact Statement (EIS) for Improvements to the Calexico West Port of Entry, Calexico, California, for... and soils) or topic area (e.g., traffic, environmental justice). After the public comment period...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... Resource Management Plan and Environmental Impact Statement, Idaho AGENCY: Bureau of Land Management... Availability of the Draft Jarbidge Field Office Resource Management Plan (RMP) and Environmental Impact Statement (EIS) in the Federal Register on September 3, 2010 [75 FR 54177] and [[Page 74743
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
... environmental impact statement (EIS) for the Mount Rushmore National Memorial General Management Plan (GMP) and will be preparing an Environmental Assessment (EA) instead. DATES: The draft GMP EA is expected to be... the appropriate level of environmental documentation for the GMP. Preliminary analysis of alternatives...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... DEPARTMENT OF ENERGY Re-Opening of the Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement AGENCY: Department of Energy. ACTION: Re-opening of the public... the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
...; MO 4500051040; TAS: 14X5017] Notice of Availability of the Draft Supplemental Environmental Impact... Availability. SUMMARY: In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and...) has prepared a Draft Supplemental Environmental Impact Statement (EIS) for the Ruby Pipeline Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-27
... Environmental Impact Statement for the Cottonwood Cove and Katherine Landing Development Concept Plans, Clark...) for the Cottonwood Cove and Katherine Landing Development Concept Plans, Lake Mead National Recreation... environment. DATES: The National Park Service will accept comments on the Draft EIS from the public for 60...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-29
... DEPARTMENT OF ENERGY Postponement of Public Hearing on the Draft Environmental Impact Statement for the Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, WV AGENCY: U.S... Carbon Capture and Storage Project (DOE/EIS-0445D) for public review and comment in a Federal Register...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... Resource Management Plans for Puget Sound Hatchery Programs and Reopening of Comment Period AGENCY... prepare an Environmental Impact Statement (EIS) for two hatchery Resource Management Plans and appended Hatchery and Genetic Management Plans (HGMPs) jointly proposed by the Washington Department of Fish and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-20
... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
... General Conformity Determination for the California High-Speed Train System Merced to Fresno Section... Environmental Impact Statement (EIS) and Final 4(f) Evaluation for the California High-Speed Train (HST) System...-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-17
... propose to construct gas processing facilities in the project area to separate natural gas liquids from... natural gas liquids to market pipelines located near Wamsutter, Wyoming (approximately 100 miles south of... Environmental Impact Statement (EIS) for the proposed Moneta Divide Natural Gas and Oil Development Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-17
... Administration (NOAA), Commerce. ACTION: Notice; intent to prepare an environmental impact statement, request for...), announces its intent to prepare an environmental impact statement (EIS) on Steller sea lion protection... with the National Environmental Policy Act of 1969. The proposed action would restrict groundfish...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... Impact Statement (draft EIS) for the Martin Dam Hydroelectric Project No. 349- 173 (Martin Dam Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Intent To Prepare an Environmental Impact Statement for the Proposed Westbrook Project, Corps Permit Application Number SPK-2005... organizations and parties are invited to participate. Significant issues to be analyzed in depth in the EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-17
... right-of-way within the Kenai National Wildlife Refuge (Refuge) under the Alaska National Interest Lands... comments or requests for information by any of the following methods to: Email: [email protected] prepare an environmental impact statement (EIS) for, a proposed right-of-way within the Refuge. The right...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-21
... that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in Polk County, Tennessee. FOR FURTHER INFORMATION CONTACT: Mr. Charles J. O'Neill, Planning and Program..., Suite 508, Nashville, Tennessee 37217, Telephone: (615) 781-5770, E-mail: Charles[email protected
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-04
... Vantage-Pomona Heights 230kV Transmission Line Project in Yakima, Grant, Benton, and Kittitas Counties, WA...) has prepared a Draft Environmental Impact Statement (EIS) for the Vantage- Pomona Heights 230kV... submit comments related to the Vantage-Pomona Heights 230kV Transmission Line Project by any of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
... Impact Statement (Final EIS) for alternatives designed to respond to coastal bluff erosion that threatens... the southeastern tip of San Juan Island, is threatened by coastal erosion at the base of the slope... (relative to coastal erosion) of each of the three action alternatives is estimated at approximately 100...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
... quality; greenhouse gases and climate change; the environmental effects of chemicals, if any, used; the... Intent to Prepare an Environmental Impact Statement for Oil and Gas Leasing and Development on Public... (EIS) and potential resource management plan (RMP) amendment to evaluate oil and gas leasing and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... Plan Amendment; UNEV Refined Liquid Petroleum Products Pipeline Environmental Impact Statement AGENCY... Environmental Impact Statement (EIS) published on April 16, 2010, is the same as that selected in the ROD. The..., Tooele, Juab, Millard, Beaver, Iron, and Washington Counties in Utah, and in Lincoln and Clark Counties...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... and Resource Management Plan/Final Environmental Impact Statement AGENCY: Bureau of Land Management... Environmental Impact Statement (LRMP/Final EIS) for the San Juan Public Lands Planning Area in Colorado, and by... and woodlands; and other components of the biological, physical and cultural environment. Copies of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... Environmental Impact Statement/ Environmental Impact Report for the Proposed Cambria Water Supply Project, San... Report (EIS/EIR) to study, plan, and implement a project to provide for a reliable water supply for the... the area relying solely upon local groundwater for its current water supply. The groundwater supplies...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... Impact Statement for the Proposed Campo Wind Energy Project, San Diego County, CA AGENCY: Bureau of... (EIS) for the proposed Campo Shu'luuk Wind Project, located on the Campo Indian Reservation in...'luuk Wind Project within the Campo Reservation is subject to BIA approval of a lease and sublease...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-30
... Treatments Using Herbicides on Bureau of Land Management Lands in Oregon AGENCY: Bureau of Land Management... Impact Statement (EIS) for Vegetation Treatments Using Herbicides on Bureau of Land Management lands in... herbicides currently in use on BLM- managed lands in Oregon and increase the number of objectives for which...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... right-of-way (ROW) authorization to construct and operate a 45-megawatt solar photovoltaic project and... Energy Solutions Lucerne Valley Solar Project, San Bernardino County, CA, and the Draft California Desert... Statement (EIS) for the proposed Chevron Energy Solutions Lucerne Valley Solar Project and by this notice is...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... a Draft Environmental Impact Statement for the West Coast Recycling Group Project in West Sacramento... (EIS/EIR) for the development of the West Coast Recycling Group project located at the Port of West... meeting date. SUPPLEMENTARY INFORMATION: Description of the Proposed Action The West Coast Recycling Group...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-23
... and Draft Environmental Impact Statement: I-17 Corridor Improvement Study; Maricopa County, Arizona... Corridor Improvement Study was published in the Federal Register on January 6, 2010. FOR FURTHER... Corridor is located in the city of Phoenix, and the study area limits for the EIS consisted of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska AGENCY: Bureau of Land.../Draft Environmental Impact Statement (EIS) for the Ring of Fire RMP for the Haines Planning Area and by... Fire RMP-- Haines Planning Area Amendment by any of the following methods: Email: [email protected
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... (EIS) for the Chevron Energy Solutions/Solar Millennium (CESSM), LLC's Blythe Solar Power Plant (BSPP... project and amend the CDCA Plan to prohibit solar energy projects on the project site. The BLM will take..., LVRWB09B2600] Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
...; 13-08807; MO 4500049868; TAS: 14X5017] Notice of Intent To Prepare a Draft Supplemental Environmental...: Notice of Intent. SUMMARY: As directed by the United States Court of Appeals for the Ninth Circuit, the Bureau of Land Management (BLM) is preparing a Draft Supplemental Environmental Impact Statement (EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... an Environmental Impact Statement (EIS) for the proposed project involving approximately 1.5 miles of the Brooklyn- Queens Expressway (BQE), Interstate 278 (I-278) in Kings County, New York (Project..., from Sands Street on the east to Atlantic Avenue on the west. The purpose of the original Project was...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... of the Draft Programmatic Environmental Impact Statement for Allocation of Oil Shale and Tar Sands... of Oil Shale and Tar Sands Resources on Lands Administered by the BLM in Colorado, Utah, and Wyoming... preferred method of commenting. Mail: Addressed to: Oil Shale and Tar Sands Resources Draft Programmatic EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... (EIS) for the Lost Creek Uranium In Situ Recovery (ISR) Project and by this notice is announcing the...-166318] Notice of Availability of the Draft Environmental Impact Statement for the Lost Creek Uranium In Situ Recovery Project, Wyoming AGENCY: Bureau of Land Management, Interior. [[Page 25194
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000.L51100000.GN0000.LVEMK10CW370-WYW... Recovery Uranium Project, Fremont and Natrona Counties, WY AGENCY: Bureau of Land Management, Interior... (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS...
78 FR 20883 - Tonto National Forest; Arizona; Salt River Allotments Vegetative Management EIS
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
...The Tonto National Forest hereby gives notice that it is extending the public comment period for the Salt River Allotments Vegetative Management Draft Environmental Impact Statement (Draft EIS), which was published in the Federal Register on February 22, 2013, (Volume 78, No. 36) originally for a 45-day comment period. Please see the Notice of Availability of the Draft EIS (78 FR 12310) for more detailed information related to the Salt River Allotments Vegetative Management Draft EIS. In response to requests for additional time, the Forest Service will extend the comment period from April 8, 2013, to May 8, 2013. Federal, State, tribal, and local governments and other interested parties are requested to comment on the Draft EIS. Comments will be accepted by email to [email protected] or by mail to Debbie Cress, Tonto National Forest, 2324 E. McDowell Rd., Phoenix, AZ 85006 (928) 595-2093 or faxed to (602) 225-5295.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-06-01
This Final Second Supplemental Environmental Impact Statement (SSEIS) to the Johnston Atoll Chemical Agent Disposal System (JACADS) Environmental Impact Statement (EIS) assesses the effects of receiving, storing, and ultimately destructing the United States stockpile of lethal unitary chemical munitions currently stored in the Federal Republic of Germany (FRG) (European stockpile) at the Army's JACADS facility located on Johnston Atoll in the Pacific Ocean. This Final SSEIS addresses the effects of the following proposed European stockpile activities: the transport of the European stockpile from the territorial limit to Johnston Island, the unloading of munitions from transportation ships, the on-island munitions transportmore » and handling, on-island munitions storage, the disposal of munitions in the JACADS facility, the disposal of incineration wastes, and alternatives to the proposed action. This document also updates information in the 1983 EIS and the 1988 SEIS, as appropriate. This volume contains reproduced letters from various agencies, reproduced written comments received from the public, and a transcript from the public meeting.« less
NEPA requires federal agencies to determine if their proposed actions will have significant environmental effects. EPA reviews and comments on these Environmental Impact Statements (EIS) and provides public notification and access to these documents.
15 CFR 923.82 - Amendment review/approval procedures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL... National Environmental Policy Act of 1969, as amended, whether an environmental impact statement (EIS) is...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
...Pursuant to the National Environmental Policy Act (NEPA), NHTSA plans to prepare an Environmental Impact Statement (EIS) to analyze the potential environmental impacts of the agency's Corporate Average Fuel Economy program for passenger automobiles (referred to herein as ``passenger cars'') and non-passenger automobiles (referred to herein as ``light trucks''). The EIS will consider the potential environmental impacts of new fuel economy standards for model years 2017-2025 passenger cars and light trucks that NHTSA will be proposing pursuant to the Energy Independence and Security Act of 2007. This notice initiates the NEPA scoping process by inviting comments from Federal, State, and local agencies, Indian tribes, and the public to help identify the environmental issues and reasonable alternatives to be examined in the EIS. This notice also provides guidance for participating in the scoping process and additional information about the alternatives NHTSA expects to consider in its NEPA analysis. In preparing this notice, NHTSA has shared the document with the Council on Environmental Quality (CEQ), the Environmental Protection Agency (EPA), and the Department of Energy (DOE).
1981-06-01
Districts completed Environmental Impact Statements (EIS) in accordance with the National Enviromental Policy Act of 1969. The EIS described the...the GREAT site as the primary site, but will evaluate alternative sites to determine if the GREAT site is justified, recognizing environmental, social ...the recommendation was to ease the conflicts between commercial navigation and recreational boaters. In essence, the program suggested by RID is the no
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-31
...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Rising Tree Wind Farm... on issues and alternatives related to the Rising Tree Wind Farm Draft EIS/EIR and possible CDCA PA by...-megawatt Rising Tree Wind Farm. The proposed project is approximately three miles west of the town of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... construction of up to 52 wind turbines and ancillary facilities. The project is 25 miles southeast of Bend... Butte Wind Power Right-of-Way, Crook and Deschutes Counties, OR AGENCY: Bureau of Land Management... Statement (EIS) for the West Butte Wind Power Right-of-Way and by this notice is announcing the opening of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... consist of: a solar field of approximately nine million ground-mounted PV modules, within up to 460 PV... Statement for a Proposed Federal Loan Guarantee To Support Construction and Start-up of the Topaz Solar Farm... for Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, California (DOE/EIS-0458...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
.../barstow/K Road_ Calico_Solar.html. E-mail: CalicoPV[email protected] . Fax: (760) 252-6098. Mail: Bureau of... Calico Solar Project, San Bernardino County, CA AGENCY: Bureau of Land Management, Interior. ACTION... Statement (EIS) for an amendment to the right-of- way (ROW) grant for the K Road Calico Solar Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... Draft Environmental Impact Statement for a Proposed Flood Risk Management Project on the Red River of... Study (EIS/FS) for a Proposed Fargo- Moorhead Flood Risk Management Project on the Red River of the North in Fargo, ND, and Moorhead, MN (Proposed Fargo-Moorhead Project). On May 5, 2009, the St. Paul...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
... Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service... Impact Statement (EIS) for Adoption of a Long-term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to January 31, 2012. The Notice to Solicit Comments and Hold Public Scoping...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... Acquisition of a Natural Gas Pipeline and Natural Gas Utility Service at the Hanford Site, Richland, WA, and... Environmental Impact Statement for the Acquisition of a Natural Gas Pipeline and Natural Gas Utility Service at the Hanford Site, Richland, Washington (Natural Gas Pipeline or NGP EIS), and initiate a 30-day public...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... transmission line on public land to support the construction of up to 52 wind turbines and ancillary facilities... Wind Power Right-of-Way, Crook and Deschutes Counties, OR AGENCY: Bureau of Land Management, Interior... Final Environmental Impact Statement (EIS) for the West Butte Wind Power Right-of-Way and by this Notice...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-27
... Lake Tahoe Passenger Ferry Project, Placer and El Dorado Counties and City of South Lake Tahoe... Statement (EIS) for the proposed Lake Tahoe Passenger Ferry Project. The project consists of a cross- lake ferry service with a South Shore Ferry Terminal at the Ski Run Marina in South Lake Tahoe, El Dorado...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
... INFORMATION section of this NOI. Requests to speak at one or more public scoping meeting(s) should be received.... ADDRESSES: Requests to speak at a public scoping meeting, comments on the scope of the EIS, and requests to... Statement and Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement; Northern...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Lost Creek In Situ Uranium Recovery Project in Sweetwater County, WY AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... the Draft EIS. ADDRESSES: You may submit comments related to the Lost Creek In Situ [[Page 7878...
75 FR 9635 - Cancellation of Environmental Impact Statement; Harris and Brazoria Counties, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
...: Cancellation of SH 35 EIS. SUMMARY: In Vol. 68, No. 210/Thursday, October 30, 2003/Notices, FHWA issued a... proposed SH 35 roadway between Bellfort Road and FM 1462 in Harris and Brazoria Counties, Texas. The use of Federal funding for this project is no longer proposed and a State Environmental Impact Statement will be...
Foundation on Economic Trends v. Bowen.
1989-10-04
The National Enviromental Policy Act requires that government agencies make a detailed enviromental impact statement (EIS) for all research significantly affecting the environment. These statements must be supplemented if the project substantially changes or if new information is obtained. The Foundation on Economic Trends argued that three developments in recombinant DNA research will significantly alter the enviromental impact, thereby mandating a new EIS by the National Institutes of Health (NIH). These developments are cloning oncogenic viruses, engineering the human immunodeficiency virus into cells not normally susceptible to it, and introducing AIDS genetic codes into mice. The U.S. District Court, District of Columbia, held that the first two projects do not pose a greater risk and that the enviromental assessment being prepared by NIH on the third satisfies the requirements of the National Enviromental Policy Act.
76 FR 82296 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
.... 20110431, Draft EIS, USFS, NV, Geothermal Leasing on the Humboldt-Toiyabe National Forest, To Facilitate the Development and Production of Geothermal Energy, Ely, Austin, Tonopah and Bridgeport Ranger...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of themore » proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-17
... and Draft Environmental Impact Statement: I-10 Corridor Improvement Study; Maricopa County, AZ AGENCY..., Arizona. A NOI to prepare an EIS for the I-10 Corridor Improvement Study was published in the Federal..., Arizona. The I-10 Corridor is in or adjacent to the cities of Phoenix, Tempe, and Chandler, as well as the...
75 FR 80807 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-23
..., CA, East County Substation/Tule Wind/ Energia Sierra Juarez Gen-Tie Projects, Construction and.... 20100462, Draft EIS, FWS, CA, Santa Clara Valley Habitat Plan, To Protect and Enhance Ecological Diversity...
75 FR 36386 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
..., Revised Draft EIS, USFS, 00, Uinta National Forest Oil and Gas Leasing, Implementation, Identify National Forest Systems Lands with Federal Mineral Rights, Wasatch, Utah, Juab, Tooele, and Sanpete Counties, UT...
Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1992-03-01
Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of addingmore » thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.« less
75 FR 7479 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... EIS, BLM, CA Chevron Energy Solutions Lucerne Valley Solar Project, Proposing To Develop a 45-megawatt (MW) Solar Photovoltaic (PV) Plant and Associated Facilities on 516 Acres of Federal Land Managed...
76 FR 72702 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... PV Solar Generating Station and Associated Infrastructure, Clark County, NV, Comment Period Ends: 01.... 20110400, Draft EIS, BIA, NV, K Road Moapa Solar Generation Facility, Moapa Band of Paiutes (Tribe), to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... Barnwell, Project Development Team Leader, Federal Highway Administration, Mississippi Division, 100 West...) in cooperation with the Mississippi Department of Transportation (MDOT) initiated an Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... 28, 2009. FOR FURTHER INFORMATION CONTACT: Claiborne Barnwell, Project Development Team Leader... Highway Administration (FHWA) in cooperation with the Mississippi Department of Transportation (MDOT...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-03
... INFORMATION CONTACT: Claiborne Barnwell, Project Development Team Leader, Federal Highway Administration... Administration (FHWA) in cooperation with the Mississippi Department of Transportation (MDOT) initiated an...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... Barnwell, Project Development Team Leader, Federal Highway Administration, Mississippi Division, 100 West... INFORMATION: Background The Federal Highway Administration (FHWA) in cooperation with the Mississippi...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
...: Claiborne Barnwell, Project Development Team Leader, Federal Highway Administration, Mississippi Division.... SUPPLEMENTARY INFORMATION: Background The Federal Highway Administration (FHWA) in cooperation with the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
..., Project Development Team Leader, Federal Highway Administration, Mississippi Division, 100 West Capitol...: Background The Federal Highway Administration (FHWA) in cooperation with the Mississippi Department of...
75 FR 9596 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
.... 20100057, Final EIS, NHTSA, 00, Corporate Average Fuel Economy (CAFE) Standards Passenger Car and Light Trucks Model Years 2012-2016, To Reduce National Energy Consumption by Increasing the Fuel Economy of...
National Environmental Policy Act in EPA Region 9
National Environmental Policy Act (NEPA) Environmental Impact Statements (EIS), Special Topics and points of contacts for EPA Region 9 Pacific Southwest serving Arizona, California, Hawaii, Nevada, Pacific islands, and 148 tribal nations.
76 FR 18217 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
.... 20110089, Draft EIS, HUD, CA, West Coast Recycling Group Metal Recycling Facility Project, Proposal to Develop and Operate a Scrap Metal Shredding and Recycling Facility at the Port of West Sacramento, Yolo...
Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Columbia River System Operation Review
1995-11-01
The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This documentmore » is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.« less
Environmental Impact Statement for the Cassini Mission. Supplement 1
NASA Technical Reports Server (NTRS)
1997-01-01
This Final Supplemental Environmental Impact Statement (FSEIS) to the 1995 Cassini mission Environmental Impact Statement (EIS) focuses on information recently made available from updated mission safety analyses. This information is pertinent to the consequence and risk analyses of potential accidents during the launch and cruise phases of the mission that were addressed in the EIS. The type of accidents evaluated are those which could potentially result in a release of plutonium dioxide from the three Radioisotope Thermoelectric Generators (RTGS) and the up to 129 Radioisotope Heater Units (RHUS) onboard the Cassini spacecraft. The RTGs use the heat of decay of plutonium dioxide to generate electric power for the spacecraft and instruments. The RHUs, each of which contains a small amount of plutonium dioxide, provide heat for controlling the thermal environment of the spacecraft and several of its instruments. The planned Cassini mission is an international cooperative effort of the National Aeronautics and Space Administration (NASA), the European Space Agency (ESA), and the Italian Space Agency (ASI) to conduct a 4-year scientific exploration of the planet Saturn, its atmosphere, moons, rings, and magnetosphere.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1991-04-01
This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build newmore » production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.« less
42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?
Code of Federal Regulations, 2011 CFR
2011-10-01
... impact on the environment, and therefore do not require environmental impact statements (EIS). Under..., state, and local officials and interested parties on potential environmental effects; (2) Document...
42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?
Code of Federal Regulations, 2010 CFR
2010-10-01
... impact on the environment, and therefore do not require environmental impact statements (EIS). Under..., state, and local officials and interested parties on potential environmental effects; (2) Document...
76 FR 63922 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
... City Charlotte to I-485 near the Mecklenburg-Cabarrus County Line, Charlotte-Mecklenburg County, NC, Review Period Ends: 11/ 14/2011, Contact: Brian C. Smart 404-865-5607. EIS No. 20110342, Draft Supplement...
38 CFR Appendix C to Part 200 - Actions Requiring Environmental Impact Statement
Code of Federal Regulations, 2013 CFR
2013-07-01
... of EIS, as indicates may have significant environmental effects: C.1Acquisition of space by Federal construction or lease construction, or expansion or improvement of an existing facility, where one or more of...
38 CFR Appendix C to Part 200 - Actions Requiring Environmental Impact Statement
Code of Federal Regulations, 2014 CFR
2014-07-01
... of EIS, as indicates may have significant environmental effects: C.1Acquisition of space by Federal construction or lease construction, or expansion or improvement of an existing facility, where one or more of...
38 CFR Appendix C to Part 200 - Actions Requiring Environmental Impact Statement
Code of Federal Regulations, 2012 CFR
2012-07-01
... of EIS, as indicates may have significant environmental effects: C.1Acquisition of space by Federal construction or lease construction, or expansion or improvement of an existing facility, where one or more of...
78 FR 13873 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-01
..., CA, Middle Fork American River Project, Review Period Ends: 04/01/2013, Contact: Matt Buhyoff 202-502.... 20130048, Draft EIS, BOEM, 00, Gulf of Mexico OCS Oil and Gas Lease Sales: 2014 and 2016 Eastern Planning...
Johnston Atoll Chemical Agent Disposal System (JACADS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-06-01
This Final Second Supplemental Environmental Impact Statement (SSEIS) to the Johnston Atoll Chemical Agent Disposal System (JACADS) Environmental Impact Statement (EIS) assesses the effects of receiving, storing, and ultimately destructing the United States stockpile of lethal unitary chemical munitions currently stored in the Federal Republic of Germany (FRG) (European stockpile) at the Army's JACADS facility located on Johnston Atoll in the Pacific Ocean. This Final SSEIS addresses the effects of the following proposed European stockpile activities: the transport of the European stockpile from the territorial limit to Johnston Island, the unloading of munitions from transportation ships, the on-island munitions transportmore » and handling, on-island munitions storage, the disposal of munitions in the JACADS facility, the disposal of incineration wastes, and alternatives to the proposed action. This document also updates information in the 1983 EIS and the 1988 SEIS, as appropriate. 46 refs., 10 figs., 9 tabs.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... correspondence. FOR FURTHER INFORMATION CONTACT: Chief Engineer, Engineering Service (138), San Francisco...-4810, extension 2009. The SFVAMC LRDP and Draft EIS are available for viewing on the SFVAMC Web site...
Code of Federal Regulations, 2010 CFR
2010-07-01
... available to the public as provided in 40 CFR 1502.19 and 1506.6. A summary may be circulated in lieu of the EIS, as provided in 40 CFR 1502.19, if the statement is unusually long. These documents will normally...
76 FR 55370 - Environmental Management Site-Specific Advisory Board, Nevada
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-07
... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY...-Wide Environmental Impact Statement (EIS) Committee of the Environmental Management Site- Specific... the areas of environmental restoration, waste management, and related activities. Purpose of the...
76 FR 50204 - Environmental Management Site-Specific Advisory Board, Nevada
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Nevada AGENCY...-Wide Environmental Impact Statement (EIS) Committee of the Environmental Management Site- Specific... management in the areas of environmental restoration, waste management, and related activities. Purpose of...
77 FR 60168 - Environmental Impact Statement: San Joaquin and Stanislaus Counties, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... (3.5 miles) in length. The project was anticipated to improve traffic safety and operations by reducing congestion and accidents. Since the NOI to prepare an EIS was published in the Federal Register on...