11. SITE BUILDING 002 SCANNER BUILDING EVAPORATIVE COOLING ...
11. SITE BUILDING 002 - SCANNER BUILDING - EVAPORATIVE COOLING TOWER SYSTEM IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
9. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...
9. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT "C" FACE RADAR SYSTEM EMITTER/ANTENNA. VIEW IS LOOKING SOUTH 30° EAST (NOTE: "C" FACE NOT IN USE AT FACILITY). - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
43. CAPE COD AIR STATION PAVE PAWS FACILITY WITH ...
43. CAPE COD AIR STATION PAVE PAWS FACILITY - WITH BUILDING METAL SIDING BEING APPLIED ON "C" FACE (RIGHT) AND "B" FACE BEING PREPARED FOR INSTALLATION. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...
33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
42. CAPE COD AIR STATION PAVE PAWS FACILITY SHOWING ...
42. CAPE COD AIR STATION PAVE PAWS FACILITY - SHOWING BUILDING "RED IRON" STEEL STRUCTURE AT 46T DAY OF STEEL CONSTRUCTION. "BUILDING TOPPED OFF, 7 JULY, 1974. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
26. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...
26. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1945 ZULU TIME, 26 OCTOBER, 1999. "SPACE TRACK BOARD" DATA SHOWING ITEMS #16609 MIR (RUSSIA) AND #25544 ISS (INTERNATIONAL SPACE STATION) BEING TRACKED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
18. SITE BUILDING 002 SCANNER BUILDING VIEW OF ...
18. SITE BUILDING 002 - SCANNER BUILDING - VIEW OF SITE SECURITY OFFICE ACCESS DOOR FROM EXTERIOR OF OFFICE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
24. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...
24. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER -- MWOC IN OPEARATION AT 1924 ZULU TIME. 26 OCTOBER, 1999. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
47. CAPE COD AIR STATION PAVE PAWS FACILITY AERIAL VIEW ...
47. CAPE COD AIR STATION PAVE PAWS FACILITY AERIAL VIEW OF "A" FACE (LEFT) WITH CLEANING SYSTEM INSTALLED (NOW REMOVED) AND "B" FACE (RIGHT) WITH CONSTRUCTION CRANE IN USE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
2. SITE BUILDING 002 SCANNER BUILDING VIEW IS ...
2. SITE BUILDING 002 - SCANNER BUILDING - VIEW IS LOOKING NORTH 80° WEST "B" FACE ALONG BUILDING "A" FACE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
23. SITE BUILDING 002 SCANNER BUILDING RADAR CONTROL ...
23. SITE BUILDING 002 - SCANNER BUILDING - RADAR CONTROL INTERFACE "RCL NO. 2" WITH COMPUTER CONTROL DISC DRIVE UNITS IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
45. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...
45. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH BUILDING METAL SIDING BEING APPLIED ON "A" FACE (LEFT) AND "B" FACE (RIGHT). NOTE THAT NORTH IS GENERALLY TO RIGHT OF VIEW. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
5. SITE BUILDING 002 SCANNER BUILDING AT "A" ...
5. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 90MM STANDARD LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
46. CAPE COD AIR STATION PAVE PAWS FACILITY BUILDING ...
46. CAPE COD AIR STATION PAVE PAWS FACILITY - BUILDING ELEVATION VIEW WITH ALL METAL SIDING INSTALLED AND WITH EMITTER/ANTENNA ARRAY SYSTEM NEARING OCMPLETION ON "B" FACE (RIGHT). VIEW ALSO SHOWS TRAVELING "CLEANING" SYSTEM ON "B" FACE - NOW REMOVED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
6. SITE BUILDING 002 SCANNER BUILDING AT "A" ...
6. SITE BUILDING 002 - SCANNER BUILDING - AT "A" FACE (ON SOUTH SIDE) LOOKING DIRECTLY UP RADAR SYSTEM EMITTER/ANTENNA ARRAY FACE WITH 65MM WIDE ANGLE LENS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
35. SITE BUILDING 004 ELECTRIC POWER STATION CONTROL ...
35. SITE BUILDING 004 - ELECTRIC POWER STATION - CONTROL ROOM OF ELECTRIC POWER STATION WITH DIESEL ENGINE POWERED ELECTRIC GENERATION EQUIPMENT IN BACKGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
34. SITE BUILDING 002 SCANNER BUILDING ROOM 105 ...
34. SITE BUILDING 002 - SCANNER BUILDING - ROOM 105 - CHILLER ROOM, SHOWING SINGLE COMPRESSOR, LIQUID CHILLERS AND "CHILLED WATER RETURN", COOLING TOWER 'TOWER WATER RETURN" AND 'TOWER WATER SUPPLY" LINES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
25. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...
25. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1930 ZULU TIME, 26 OCTOBER, 1999. MWOC SCREEN ALSO SHOWS RADAR "FACE A" AND "FACE B" ACTIVE STATUS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
29. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...
29. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) AT SYSTEM LAYOUT GRID 17. GENERAL OBLIQUE VIEW OF "A" FACE INTERIOR SHOWING RADAR EMITTER/ANTENNA INTERFACE ELECTRONICS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
10. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...
10. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT SOUTHWEST CORNER "B" FACE AND "C" FACE ON WEST AND EVAPORATIVE COOLING TOWER AT NORTH. VIEW IS LOOKING NORTH 45° EAST. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
19. SITE BUILDING 002 SCANNER BUILDING AIR POLICE ...
19. SITE BUILDING 002 - SCANNER BUILDING - AIR POLICE SITE SECURITY OFFICE WITH "SITE PERIMETER STATUS PANEL" AND REAL TIME VIDEO DISPLAY OUTPUT FROM VIDEO CAMERA SYSTEM AT SECURITY FENCE LOCATIONS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
36. SITE BUILDING 004 ELECTRIC POWER STATION CLOSE ...
36. SITE BUILDING 004 - ELECTRIC POWER STATION - CLOSE UP VIEW OF 1200 HORSEPOWER STANDBY POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
37. SITE BUILDING 004 ELECTRIC POWER STATION ELEVATED ...
37. SITE BUILDING 004 - ELECTRIC POWER STATION - ELEVATED VIEW OF FIVE (5) 1200 HORSEPOWER STANDBY - POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...
20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
38. SITE BUILDING 004 ELECTRIC POWER STATION AT INTERIOR ...
38. SITE BUILDING 004 - ELECTRIC POWER STATION AT INTERIOR - OBLIQUE VIEW AT FLOOR LEVEL SHOWING DIESEL ENGINE/GENERATOR SET NUMBER 5. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
21. SITE BUILDING 002 SCANNER BUILDING LOOKING AT ...
21. SITE BUILDING 002 - SCANNER BUILDING - LOOKING AT DISC STORAGE SYSTEMS A AND B (A OR B ARE REDUNDANT SYSTEMS), ONE MAINFRAME COMPUTER ON LINE, ONE ON STANDBY WITH STORAGE TAPE, ONE ON STANDBY WITHOUT TAPE INSTALLED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
15. SITE BUILDING 004 ELECTRIC POWER STATION VIEW ...
15. SITE BUILDING 004 - ELECTRIC POWER STATION - VIEW IS LOOKING SOUTH 55° EAST AT FIVE DIESEL ENGINE/ GENERATOR SILENCER SYSTEM EXHAUST STACKS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
40. Photocopy of building model photograph, ca., 1974, photographer unknown. ...
40. Photocopy of building model photograph, ca., 1974, photographer unknown. Original photograph property of United States Air Force, 21" Space Command. CAPE COD AIR STATION PAVE PAWS FACILITY MODEL - ELEVATION SHOWING FLOOR AND EQUIPMENT LAYOUT. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
39. Photocopy of building model photograph, ca. 1974, photographer unknown. ...
39. Photocopy of building model photograph, ca. 1974, photographer unknown. Original photograph property of United States Air Force, 21" Space Command. CAPE COD AIR STATION PAVE PAWS FACILITY MODEL - SHOWING "A" AND "B" FACES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
56. Photocopy of Mechanical drawing, dated August 6, 1976 by ...
56. Photocopy of Mechanical drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. H-12 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - EQUIPMENT ROOM PLANS. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
53. Photocopy of Structural drawing, dated August 6, 1976 by ...
53. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-4 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FIRST FLOOR PLAN. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
55. Photocopy of Structural drawing, dated August 6, 1976 by ...
55. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-15 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - UTILITY BUILDING. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
54. Photocopy of Structural drawing, dated August 6, 1976 by ...
54. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-14 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - ARRAY DETAILS. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
41. Photocopy of progress photograph ca. 1974, photographer unknown. Original ...
41. Photocopy of progress photograph ca. 1974, photographer unknown. Original photograph Property of United States Air Force, 21" Space Command. This is the source for views 41 to 47. CAPE COD AIR STATION PAVE PAWS FACILITY - SHOWING BUILDING "RED IRON" STEEL STRUCTURE NEARING COMPLETION. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
50. Photocopy of Architectural drawing, dated August 6, 1976 by ...
50. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-5 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FOURTH FLOOR AND PLATFORM 4A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
52. Photocopy of Architectural drawing, dated August 6, 1976 by ...
52. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21' Space Command. A-10 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - ELEVATION A, B AND C. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
51. Photocopy of Architectural drawing, dated August 6, 1976 by ...
51. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-6 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FIFTH FLOOR AND PLATFORM 5A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
49. Photocopy of Architectural drawing, dated August 6, 1976 by ...
49. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-4 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - THIRD FLOOR AND PLATFORM 3A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
48. Photocopy of Architectural Layout drawing, dated August 6, 1976 ...
48. Photocopy of Architectural Layout drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. AL-2 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - EQUIPMENT LAYOUT - SECOND FLOOR AND PLATFORM 2A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
30. SITE BUILDING 002 SCANNER BUILDING FLOOR 3A ...
30. SITE BUILDING 002 - SCANNER BUILDING - FLOOR 3A ("A" FACE) INTERIOR BETWEEN GRIDS 17-A1 AND 18-A1, SHOWING REAR OF RADAR EMITTER ELECTRONIC INTERFACE TERMINAL NO. 3147-20, "RECEIVER TRANSMITTER RADAR" MODULE. VIEW IS ALSO SHOWING BUILDING FIRE STOP MATERIAL AT BOTTOM OF FLOOR. NOTE: WALL SLOPES BOTTOM TO TOP INWARD; STRUCTURAL ELEMENT IN FOREGROUND. VIEW ALSO SHOWS PIPING GRID OF CHILLED WATER LINES FOR ELECTRONIC SYSTEMS COOLING. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
59. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...
59. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. AL-6 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - LAYOUT 4-A, 5TH & 5-A. DRAWING NO. AL-6 - SHEET 7 OF 21. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
57. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...
57. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. AL-3 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - LAYOUT 1 FLOOR AND 1sr FLOOR ROOF. DRAWING NO. AL-3 - SHEET 4 OF 21. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
58. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...
58. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. AL-5 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - LAYOUT 3RD, 3A, 4TH LEVELS. DRAWING NO. AL-5 - SHEET 6 OF 21 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
Comparison of solid shapes geometry derived by a laser scanner and a total station
NASA Astrophysics Data System (ADS)
Sidiropoulos, Andreas; Lakakis, Konstantinos
2016-08-01
The laser scanning technology has become a common method for the daily applications of a large variety of scientists and professionals. Even for more sophisticated projects, laser scanners have been proved a very useful tool at researchers' and engineers' disposal. In this paper, we investigated the ability of a laser scanner compared to the ability of a total station to provide the geometry of solids. The tests were made in the laboratory facilities of the Aristotle University of Thessaloniki, in a variety of distances between the measuring instrument and the object. The solids that were used differ in shape, material and color. The objects are a wooden cube, a metal cube and a wooden pyramid. The absolute dimensions of the solid shapes were provided by the use of a caliper and were compared to the dimensions that were calculated by the coordinates produced by the total station and laser scanner measurements.
2003-09-08
KENNEDY SPACE CENTER, FLA. - The Window Observational Research Facility (WORF), seen in the Space Station Processing Facility, was designed and built by the Boeing Co. at NASA’s Marshall Space Flight Center in Huntsville, Ala. WORF will be delivered to the International Space Station and placed in the rack position in front of the Destiny lab window, providing locations for attaching cameras, multi-spectral scanners and other instruments. WORF will support a variety of scientific and commercial experiments in areas of Earth systems and processes, global ecological changes in Earth’s biosphere, lithosphere, hydrosphere and climate system, Earth resources, natural hazards, and education. After installation, it will become a permanent focal point for Earth Science research aboard the space station.
2003-09-08
KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility check out the Window Observational Research Facility (WORF), designed and built by the Boeing Co. at NASA’s Marshall Space Flight Center in Huntsville, Ala. WORF will be delivered to the International Space Station and placed in the rack position in front of the Destiny lab window, providing locations for attaching cameras, multi-spectral scanners and other instruments. WORF will support a variety of scientific and commercial experiments in areas of Earth systems and processes, global ecological changes in Earth’s biosphere, lithosphere, hydrosphere and climate system, Earth resources, natural hazards, and education. After installation, it will become a permanent focal point for Earth Science research aboard the space station.
Unmanned spacecraft for surveying earth's resources
NASA Technical Reports Server (NTRS)
George, T. A.
1970-01-01
The technical objectives and payloads for ERTS A and B are discussed. The primary emphasis is on coverage of the United States and the ocean areas immediately adjacent, using 3-camera return beam vidicon TV system, 4-channel multispectral point scanner, data collection system, and wideband video tape recorder. The expected performance and system characteristics of the RBV system and the 4-band multispectral object plane point scanner are outlined. Ground station considerations are also given.
3D WindScanner lidar measurements of wind and turbulence around wind turbines, buildings and bridges
NASA Astrophysics Data System (ADS)
Mikkelsen, T.; Sjöholm, M.; Angelou, N.; Mann, J.
2017-12-01
WindScanner is a distributed research infrastructure developed at DTU with the participation of a number of European countries. The research infrastructure consists of a mobile technically advanced facility for remote measurement of wind and turbulence in 3D. The WindScanners provide coordinated measurements of the entire wind and turbulence fields, of all three wind components scanned in 3D space. Although primarily developed for research related to on- and offshore wind turbines and wind farms, the facility is also well suited for scanning turbulent wind fields around buildings, bridges, aviation structures and of flow in urban environments. The mobile WindScanner facility enables 3D scanning of wind and turbulence fields in full scale within the atmospheric boundary layer at ranges from 10 meters to 5 (10) kilometers. Measurements of turbulent coherent structures are applied for investigation of flow pattern and dynamical loads from turbines, building structures and bridges and in relation to optimization of the location of, for example, wind farms and suspension bridges. This paper presents our achievements to date and reviews briefly the state-of-the-art of the WindScanner measurement technology with examples of uses for wind engineering applications.
NASA Technical Reports Server (NTRS)
Viter, V.
1993-01-01
The basic data of the automatic space station ALMAZ-1B is overviewed, including the orbit parameters and maximum power. The principal technical characteristics of its remote sensing equipment is listed for the synthetic aperture and side-looking radar, optoelectronic equipment for stereophotography, high-resolution electronic scanner, middle-resolution optomechanical scanner, spectroradiometer for ocean satellite monitoring, and information transmission and reception. The main objectives and uses of the ALMAZ-1B information are cartography, land monitoring, geology, ecological monitoring, oceanology, pilotage, fishery, and information supply during an emergency such as controlling situation in natural disasters.
Space station systems technology study (add-on task). Volume 3: Technology advancement program plan
NASA Technical Reports Server (NTRS)
1985-01-01
Program plans are given for an integrating controller for space station autonomy as well as for controls and displays. The technical approach, facility requirements and candidate facilities, development schedules, and resource requirements estimates are given.
47 CFR 74.131 - Licensing requirements, necessary showing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... experimental broadcast station, change in facilities of any existing station, or modification of license is... research and experimentation in the technical phases of broadcasting which indicates reasonable promise of...
47 CFR 74.131 - Licensing requirements, necessary showing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... experimental broadcast station, change in facilities of any existing station, or modification of license is... research and experimentation in the technical phases of broadcasting which indicates reasonable promise of...
NASA Astrophysics Data System (ADS)
ter Kuile, Willem M.; van Veen, J. J.; Knoll, Bas
1995-02-01
Usual sampling methods and instruments for checking compliance with `threshold limit values' (TLV) of gaseous components do not provide much information on the mechanism which caused the measured workday average concentration. In the case of noncompliance this information is indispensable for the design of cost effective measures. The infrared gas cloud (IGC) scanner visualizes the spatial distribution of specific gases at a workplace in a quantitative image with a calibrated grayvalue scale. This helps to find the cause of an over- exposure, and so it permits effective abatement of high exposures in the working environment. This paper deals with the technical design of the IGC scanner. Its use is illustrated by some real-world problems. The measuring principle and the technical operation of the IGC-scanner are described. Special attention is given to the pros and cons of retro-reflector screens, the noise reduction methods and image presentation and interpretation. The latter is illustrated by the images produced by the measurements. Essentially the IGC scanner can be used for selective open-path measurement of all gases with a concentration in the ppm range and sufficiently strong distinct absorption lines in the infrared region between 2.5 micrometers and 14.0 micrometers . Further it could be useful for testing the efficiency of ventilation systems and the remote detection of gas leaks. We conclude that a new powerful technique has been added to the industrial hygiene facilities for controlling and improving the work environment.
117. Back side technical facilities S.R. radar transmitter & computer ...
117. Back side technical facilities S.R. radar transmitter & computer building no. 102, "building sections - sheet I" - architectural, AS-BLT AW 35-46-04, sheet 12, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
122. Back side technical facilities S.R. radar transmitter & computer ...
122. Back side technical facilities S.R. radar transmitter & computer building no. 102, section II "elevations & details" - structural, AS-BLT AW 35-46-04, sheet 73, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
118. Back side technical facilities S.R. radar transmitter & computer ...
118. Back side technical facilities S.R. radar transmitter & computer building no. 102, "building sections - sheet I" - architectural, AS-BLT AW 35-46-04, sheet 13, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
121. Back side technical facilities S.R. radar transmitter & computer ...
121. Back side technical facilities S.R. radar transmitter & computer building no. 102, section II "sections & elevations" - structural, AS-BLT AW 35-46-04, sheet 72, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Towards System Calibration of Panoramic Laser Scanners from a Single Station
Medić, Tomislav; Holst, Christoph; Kuhlmann, Heiner
2017-01-01
Terrestrial laser scanner measurements suffer from systematic errors due to internal misalignments. The magnitude of the resulting errors in the point cloud in many cases exceeds the magnitude of random errors. Hence, the task of calibrating a laser scanner is important for applications with high accuracy demands. This paper primarily addresses the case of panoramic terrestrial laser scanners. Herein, it is proven that most of the calibration parameters can be estimated from a single scanner station without a need for any reference information. This hypothesis is confirmed through an empirical experiment, which was conducted in a large machine hall using a Leica Scan Station P20 panoramic laser scanner. The calibration approach is based on the widely used target-based self-calibration approach, with small modifications. A new angular parameterization is used in order to implicitly introduce measurements in two faces of the instrument and for the implementation of calibration parameters describing genuine mechanical misalignments. Additionally, a computationally preferable calibration algorithm based on the two-face measurements is introduced. In the end, the calibration results are discussed, highlighting all necessary prerequisites for the scanner calibration from a single scanner station. PMID:28513548
Scientific tradeoffs in pinhole/occulter facility accommodation
NASA Technical Reports Server (NTRS)
Hudson, Hugh S.
1988-01-01
The Pinhole/Occulter Facility (P/OF) consists of state-of-the-art instruments for the study of particle acceleration in the solar corona, and uses a large structure to obtain very high angular resolution. P/OF has been studied in the past as an attached payload for the Space Shuttle, and has been the subject of study by a NASA Science Working Group (P/OFSWG). Appendix A lists various technical studies and reports carried out under the auspices of P/OFSWG and the Program Development Office of NASA Marshall Space Flight Center. Under the rationalization of NASA flight opportunities following the Challenger disaster, and the beginning of the Space Station Freedom program, the sortie-mode deployment of P/OF seemed less efficient and desirable. Thus, NASA decided to reconsider P/OF for deployment on the Space Station Freedom. The technical studies for this deployment continue at the present and will evolve as our knowledge of Space Station architecture and capabilities increase. MSFC contracted with Teledyne Brown Engineering for these technical studies.
Tethered orbital refueling study
NASA Technical Reports Server (NTRS)
Fester, Dale A.; Rudolph, L. Kevin; Kiefel, Erlinda R.; Abbott, Peter W.; Grossrode, Pat
1986-01-01
One of the major applications of the space station will be to act as a refueling depot for cryogenic-fueled space-based orbital transfer vehicles (OTV), Earth-storable fueled orbit maneuvering vehicles, and refurbishable satellite spacecraft using hydrazine. One alternative for fuel storage at the space station is a tethered orbital refueling facility (TORF), separated from the space station by a sufficient distance to induce a gravity gradient force that settles the stored fuels. The technical feasibility was examined with the primary focus on the refueling of LO2/LH2 orbital transfer vehicles. Also examined was the tethered facility on the space station. It was compared to a zero-gravity facility. A tethered refueling facility should be considered as a viable alternative to a zero-gravity facility if the zero-gravity fluid transfer technology, such as the propellant management device and no vent fill, proves to be difficult to develop with the required performance.
120. Back side technical facilities S.R. radar transmitter & computer ...
120. Back side technical facilities S.R. radar transmitter & computer building no. 102, section II "foundation & first floor plan" - structural, AS-BLT AW 35-46-04, sheet 65, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
119. Back side technical facilities S.R. radar transmitter & computer ...
119. Back side technical facilities S.R. radar transmitter & computer building no. 102, section I "tower plan, sections & details" - structural, AS-BLT AW 35-46-04, sheet 62, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
...; Oyster Creek Nuclear Generating Station; Notice of Withdrawal of Application for Amendment to Facility... Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), located in Ocean County, New Jersey. The proposed amendment would have revised the Technical Specifications to...
ERTS operations and data processing
NASA Technical Reports Server (NTRS)
Gonzales, L.; Sos, J. Y.
1974-01-01
The overall communications and data flow between the ERTS spacecraft and the ground stations and processing centers are generally described. Data from the multispectral scanner and the return beam vidicon are telemetered to a primary ground station where they are demodulated, processed, and recorded. The tapes are then transferred to the NASA Data Processing Facility (NDPF) at Goddard. Housekeeping data are relayed from the prime ground stations to the Operations Control Center at Goddard. Tracking data are processed at the ground stations, and the calculated parameters are transmitted by teletype to the orbit determination group at Goddard. The ERTS orbit has been designed so that the same swaths of the ground coverage pattern viewed during one 18-day coverage cycle are repeated by the swaths viewed on all subsequent cycles. The Operations Control Center is the focal point for all communications with the spacecraft. NDPF is a job-oriented facility which processes and stores all sensor data, and which disseminates large quantities of these data to users in the form of films, computer-compatible tapes, and data collection system data.
47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...
47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...
47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...
47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...
47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...
2004-02-03
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers check over the Italian-built Node 2, a future element of the International Space Station. The second of three Station connecting modules, the Node 2 attaches to the end of the U.S. Lab and provides attach locations for several other elements. Kopra is currently assigned technical duties in the Space Station Branch of the Astronaut Office, where his primary focus involves the testing of crew interfaces for two future ISS modules as well as the implementation of support computers and operational Local Area Network on ISS. Node 2 is scheduled to launch on mission STS-120, Station assembly flight 10A.
Life Sciences Centrifuge Facility assessment
NASA Technical Reports Server (NTRS)
Benson, Robert H.
1994-01-01
This report provides an assessment of the status of the Centrifuge Facility being developed by ARC for flight on the International Space Station Alpha. The assessment includes technical status, schedules, budgets, project management, performance of facility relative to science requirements, and identifies risks and issues that need to be considered in future development activities.
Space station attached payload program support
NASA Technical Reports Server (NTRS)
Estes, Maurice G., Jr.; Brown, Bardle D.
1989-01-01
The USRA is providing management and technical support for the peer review of the Space Station Freedom Attached Payload proposals. USRA is arranging for consultants to evaluate proposals, arranging meeting facilities for the reviewers to meet in Huntsville, Alabama and management of the actual review meetings. Assistance in developing an Experiment Requirements Data Base and Engineering/Technical Assessment support for the MSFC Technical Evaluation Team is also being provided. The results of the project will be coordinated into a consistent set of reviews and reports by USRA. The strengths and weaknesses analysis provided by the peer panel reviewers will by used NASA personnel in the selection of experiments for implementation on the Space Station Freedom.
Intellectual system of identification of Arabic graphics
NASA Astrophysics Data System (ADS)
Abdoullayeva, Gulchin G.; Aliyev, Telman A.; Gurbanova, Nazakat G.
2001-08-01
The studies made by using the domain of graphic images allowed creating facilities of the artificial intelligence for letters, letter combinations etc. for various graphics and prints. The work proposes a system of recognition and identification of symbols of the Arabic graphics, which has its own specificity as compared to Latin and Cyrillic ones. The starting stage of the recognition and the identification is coding with further entry of information into a computer. Here the problem of entry is one of the essentials. For entry of a large volume of information in the unit of time a scanner is usually employed. Along with the scanner the authors suggest their elaboration of technical facilities for effective input and coding of the information. For refinement of symbols not identified from the scanner mostly for a small bulk of information the developed coding devices are used directly in the process of writing. The functional design of the software is elaborated on the basis of the heuristic model of the creative activity of a researcher and experts in the description and estimation of states of the weakly formalizable systems on the strength of the methods of identification and of selection of geometric features.
NASA Technical Reports Server (NTRS)
1992-01-01
The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. The facility is designed to support a complement of furnace modules as outlined in the Science Capabilities Requirements Document (SCRD). The SSFF is a three rack facility that provides the functions, interfaces, and equipment necessary for the processing of the furnaces and consists of two main parts: the SSFF Core Rack and the two Experiment Racks. The facility is designed to accommodate two experimenter-provided furnace modules housed within the two experiment racks, and is designed to operate these two furnace modules simultaneously. The SCRD specifies a wide range of furnace requirements and serves as the basis for the SSFF conceptual design. SSFF will support automated processing during the man-tended operations and is also designed for crew interface during the permanently manned configuration. The facility is modular in design and facilitates changes as required, so the SSFF is adept to modifications, maintenance, reconfiguration, and technology evolution.
Digital imaging technology assessment: Digital document storage project
NASA Technical Reports Server (NTRS)
1989-01-01
An ongoing technical assessment and requirements definition project is examining the potential role of digital imaging technology at NASA's STI facility. The focus is on the basic components of imaging technology in today's marketplace as well as the components anticipated in the near future. Presented is a requirement specification for a prototype project, an initial examination of current image processing at the STI facility, and an initial summary of image processing projects at other sites. Operational imaging systems incorporate scanners, optical storage, high resolution monitors, processing nodes, magnetic storage, jukeboxes, specialized boards, optical character recognition gear, pixel addressable printers, communications, and complex software processes.
2004-02-03
KENNEDY SPACE CENTER, FLA. - Astronaut Tim Kopra (second from right) talks with workers in the Space Station Processing Facility about the Intravehicular Activity (IVA) constraints testing on the Italian-built Node 2, a future element of the International Space Station. . The second of three Station connecting modules, the Node 2 attaches to the end of the U.S. Lab and provides attach locations for several other elements. Kopra is currently assigned technical duties in the Space Station Branch of the Astronaut Office, where his primary focus involves the testing of crew interfaces for two future ISS modules as well as the implementation of support computers and operational Local Area Network on ISS. Node 2 is scheduled to launch on mission STS-120, Station assembly flight 10A.
USGS Scientific Visualization Laboratory
,
1995-01-01
The U.S. Geological Survey's (USGS) Scientific Visualization Laboratory at the National Center in Reston, Va., provides a central facility where USGS employees can use state-of-the-art equipment for projects ranging from presentation graphics preparation to complex visual representations of scientific data. Equipment including color printers, black-and-white and color scanners, film recorders, video equipment, and DOS, Apple Macintosh, and UNIX platforms with software are available for both technical and nontechnical users. The laboratory staff provides assistance and demonstrations in the use of the hardware and software products.
Comparison of working efficiency of terrestrial laser scanner in day and night conditions
NASA Astrophysics Data System (ADS)
Arslan, A. E.; Kalkan, K.
2013-10-01
Terrestrial Laser Scanning is a popular and widely used technique to scan existing objects, document historical sites and items, and remodel them if and when needed. Their ability to collect thousands of point data per second makes them an invaluable tool in many areas from engineering to historical reconstruction. There are many scanners in the market with different technical specifications. One main technical specification of laser scanners is range and illumination. In this study, it is tested to be determined the optimal working times of a laser scanner and the scanners consistency with its specifications sheet. In order to conduct this work, series of GNSS measurements in Istanbul Technical University have been carried out, connected to the national reference network, to determine precise positions of target points and the scanner, which makes possible to define a precise distance between the scanner and targets. Those ground surveys has been used for calibration and registration purposes. Two different scan campaigns conducted at 12 am and 11 pm to compare working efficiency of laser scanner in different illumination conditions and targets are measured with a handheld spectro-radiometer in order to determine their reflective characteristics. The obtained results are compared and their accuracies have been analysed.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-03
... Additional 20-Year Period; Record of Decision Notice is hereby given that the U.S. Nuclear Regulatory... technical specifications. The notice also serves as the record of decision for the renewal of facility..., efficiency, wood-fired generation, and wind power; and non-renewal of the operating license. The factors...
NASA Technical Reports Server (NTRS)
1977-01-01
A brief description of recommended supporting research and technology items resulting from the space station analysis study is provided. Descriptions include the title; the status with respect to the state of the art; the justification; the technical plan including objectives and technical approach; resource requirements categorized by manpower, specialized facilities, and funding in 1977 dollars; and also the target schedule. The goal is to provide high confidence in the solutions for the various functional system development problems, and to do so within a time period compatible with the overall evolutionary space construction base schedule.
Design summary of a geostationary facility utilized as a communications platform
NASA Technical Reports Server (NTRS)
Barberis, N. J.; Brown, J. V.
1986-01-01
This paper describes the technical aspects of a geostationary platform facility that makes maximum use of the planned NASA space station and its elements, mainly the orbital maneuvering vehicle (OMV) and the orbital transfer vehicles (OTV). The platform design concept is described, with emphasis on the key technologies utilized to configure the platform. Key systems aspects include a design summary with discussion of the controls, telemetry, command and ranging, power, propulsion, control electronics, thermal control subsystems, and space station interfaces. The use of the facility as a communications platform is developed to demonstrate the attractiveness of the concept. The economic benefits are discussed, as well as the concept of servicing for payload upgrade.
DeMartini, Wendy B; Ichikawa, Laura; Yankaskas, Bonnie C; Buist, Diana; Kerlikowske, Karla; Geller, Berta; Onega, Tracy; Rosenberg, Robert D; Lehman, Constance D
2010-11-01
MRI is increasingly used for the detection of breast carcinoma. Little is known about breast MRI techniques among community practice facilities. The aim of this study was to evaluate equipment and acquisition techniques used by community facilities across the United States, including compliance with minimum standards by the ACRIN® 6667 Trial and the European Society of Breast Imaging. Breast Cancer Surveillance Consortium facilities performing breast MRI were identified and queried by survey regarding breast MRI equipment and technical parameters. Variables included scanner field strength, coil type, acquisition coverage, slice thickness, and the timing of the initial postcontrast sequence. Results were tallied and percentages of facilities meeting ACRIN® and European Society of Breast Imaging standards were calculated. From 23 facilities performing breast MRI, results were obtained from 14 (61%) facilities with 16 MRI scanners reporting 18 imaging parameters. Compliance with equipment recommendations of ≥1.5-T field strength was 94% and of a dedicated breast coil was 100%. Eighty-three percent of acquisitions used bilateral postcontrast techniques, and 78% used slice thickness≤3 mm. The timing of initial postcontrast sequences ranged from 58 seconds to 8 minutes 30 seconds, with 63% meeting recommendations for completion within 4 minutes. Nearly all surveyed facilities met ACRIN and European Society of Breast Imaging standards for breast MRI equipment. The majority met standards for acquisition parameters, although techniques varied, in particular for the timing of initial postcontrast imaging. Further guidelines by the ACR Breast MRI Accreditation Program will be of importance in facilitating standardized and high-quality breast MRI. Copyright © 2010 American College of Radiology. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
1983-01-01
The Flat Plate Solar Array Project, focuses on advancing technologies relevant to the design and construction of megawatt level central station systems. Photovoltaic modules and arrays for flat plate central station or other large scale electric power production facilities require the establishment of a technical base that resolves design issues and results in practical and cost effective configurations. Design, qualification and maintenance issues related to central station arrays derived from the engineering and operating experiences of early applications and parallel laboratory reserch activities are investigated. Technical issues are examined from the viewpoint of the utility engineer, architect/engineer and laboratory researcher. Topics on optimum source circuit designs, module insulation design for high system voltages, array safety, structural interface design, measurements, and array operation and maintenance are discussed.
Space Station: The next iteration
NASA Astrophysics Data System (ADS)
Foley, Theresa M.
1995-01-01
NASA's international space station is nearing the completion stage of its troublesome 10-year design phase. With a revised design and new management team, NASA is tasked to deliver the station on time at a budget acceptable to both Congress and the White House. For the next three years, NASA is using tried-and-tested Russian hardware as the technical centerpiece of the station. The new station configuration consists of eight pressurized modules in which the crew can live and work; a long metal truss to connect the pieces; a robot arm for exterior jobs; a solar power system; and propelling the facility in space.
2016-11-15
During a ribbon cutting ceremony in the high bay of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, center director Bob Cabana, far left, is joined by Bill Dowdell, Kennedy's International Space Station technical director, Josephine Burnett, director of Exploration Research and Technology, Andy Allen, Jacobs vice president and general manager and Test and Operations Support Contract program manager, and Jeff McAlear, Jacobs director of Processing Services. The event celebrated completion of facility modifications to improve processing and free up zones tailored to a variety of needs supporting a robust assortment of space-bound hardware including NASA programs and commercial space companies.
Bergeron, Catherine; Fleet, Richard; Tounkara, Fatoumata Korika; Lavallée-Bourget, Isabelle; Turgeon-Pelchat, Catherine
2017-12-28
Rural emergency departments (EDs) are an important gateway to care for the 20% of Canadians who reside in rural areas. Less than 15% of Canadian rural EDs have access to a computed tomography (CT) scanner. We hypothesized that a significant proportion of inter-facility transfers from rural hospitals without CT scanners are for CT imaging. Our objective was to assess inter-facility transfers for CT imaging in a rural ED without a CT scanner. We selected a rural ED that offers 24/7 medical care with admission beds but no CT scanner. Descriptive statistics were collected from 2010 to 2015 on total ED visits and inter-facility transfers. Data was accessible through hospital and government databases. Between 2010 and 2014, there were respectively 13,531, 13,524, 13,827, 12,883, and 12,942 ED visits, with an average of 444 inter-facility transfers. An average of 33% (148/444) of inter-facility transfers were to a rural referral centre with a CT scan, with 84% being for CT scan. Inter-facility transfers incur costs and potential delays in patient diagnosis and management, yet current databases could not capture transfer times. Acquiring a CT scan may represent a reasonable opportunity for the selected rural hospital considering the number of required transfers.
51. View of upper radar scanner switch in radar scanner ...
51. View of upper radar scanner switch in radar scanner building 105 from upper catwalk level showing emanating waveguides from upper switch (upper one-fourth of photograph) and emanating waveguides from lower radar scanner switch in vertical runs. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
NASA Technical Reports Server (NTRS)
Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia
1997-01-01
This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, is moved across the facility. The arm will be installed on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station (ISS). Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
Tactical UAV’s in the French Army
2003-09-02
French Army Technical Service, France 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR... FRENCH ARMY PROJECTION PLATOON Platoon Maintenance Facilities (1st & 2nd echelons) Platoon HQ Launching System Ground Control Station / Remote Data...Tactical UAV’s in the French Army LtCol Pierre-Yves HENRY, Technical Service of the French Army, Program Officer for Battlefield Surveillance Report
The challenge of the US Space Station
NASA Technical Reports Server (NTRS)
Beggs, J. M.
1985-01-01
The U.S. Space Station program is described. The objectives of the present national space policy are reviewed. International involvement and commercial use of space are the two strategies involved in the development of the Space Station. The Space Station is to be a multifunctional, modular, permanent facility with manned and unmanned platforms. The functions of the Space Station for space research projects, such as material processing and electrophoresis, are examined. The infrastructure required for commercialization of space is analyzed. NASA's space policy aimed at stimulating space commerce is discussed. NASA's plans to reduce the financial, institutional, and technical risks of space research are studied.
MSG: Microgravity Science Glovebox
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baugher, C.R.; Ramachandran, N.; Roark, W.
1996-12-31
The capabilities of the Space Station glovebox facility is described. Tentatively scheduled to be launched in 1999, this facility called the Microgravity Sciences Glovebox (MSG), will provide a robust and sophisticated platform for doing microgravity experiments on the Space Station. It will provide an environment not only for testing and evaluating experiment concepts, but also serve as a platform for doing fairly comprehensive science investigations. Its design has evolved substantially from the middeck glovebox, now flown on Space Shuttle missions, not only in increased experiment volume but also in significant capability enhancements. The system concept, functionality and architecture are discussedmore » along with technical information that will benefit potential science investigators.« less
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, technicians begin raising the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, for its move across the facility. The arm will be installed on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station ISS. Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
Surface Meteorological Station - SWiFT southwest - METa1 - Reviewed Data
Herges, Thomas
2017-10-23
Scaled Wind Farm Technology (SWiFT) Facility meteorological tower (MET), turbine, and Technical University of Denmark (DTU) SpinnerLidar data acquired on 20161216 UTC during a neutral atmospheric boundary layer inflow at a single focus distance of 2.5 D (D=27 m).
Consideration of adding a commercial module to the International Space Station
NASA Astrophysics Data System (ADS)
Friefeld, J.; Fugleberg, D.; Patel, J.; Subbaraman, G.
1999-01-01
The National Aeronautics and Space Administration (NASA) is currently assembling the International Space Station in Low Earth Orbit. One of NASA's program objectives is to encourage space commercialization. Through NASA's Engineering Research and Technology Development program, Boeing is conducting a study to ascertain the feasibility of adding a commercial module to the International Space Station. This module (facility) that can be added, following on-orbit assembly is described. The facility would have the capability to test large, engineering scale payloads in a space environment. It would also have the capability to provide services to co-orbiting space vehicles as well as gathering data for commercial terrestrial applications. The types of industries to be serviced are described as are some of the technical and business considerations that need to be addressed in order to achieve commercial viability.
Antenna Near-Field Probe Station Scanner
NASA Technical Reports Server (NTRS)
Darby, William G. (Inventor); Miranda, Felix A. (Inventor); Zaman, Afroz J. (Inventor); Lee, Richard Q. (Inventor); Barr, Philip J. (Inventor); Lambert, Kevin M (Inventor)
2011-01-01
A miniaturized antenna system is characterized non-destructively through the use of a scanner that measures its near-field radiated power performance. When taking measurements, the scanner can be moved linearly along the x, y and z axis, as well as rotationally relative to the antenna. The data obtained from the characterization are processed to determine the far-field properties of the system and to optimize the system. Each antenna is excited using a probe station system while a scanning probe scans the space above the antenna to measure the near field signals. Upon completion of the scan, the near-field patterns are transformed into far-field patterns. Along with taking data, this system also allows for extensive graphing and analysis of both the near-field and far-field data. The details of the probe station as well as the procedures for setting up a test, conducting a test, and analyzing the resulting data are also described.
52. View from ground level showing lower radar scanner switch ...
52. View from ground level showing lower radar scanner switch with open port door in radar scanner building 105 showing emanating waveguides from lower switch in vertical run; photograph also shows catwalk to upper scanner switch in upper left side of photograph and structural supports. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Gas-Grain Simulation Facility (GGSF). Volume 1: Stage 1 facility definition studies
NASA Technical Reports Server (NTRS)
Gat, Nahum
1993-01-01
The Gas-Grain Simulation Facility (GGSF) is a facility-type payload to be included in the Space Station Freedom (SSF). The GGSF is a multidisciplinary facility that will accommodate several classes of experiments, including exobiology, planetary science, atmospheric science, and astrophysics. The physical mechanisms envisioned to be investigated include crystal growth, aggregation, nucleation, coagulation, condensation, collisions, fractal growth, cycles of freezing and evaporation, scavenging, longevity of bacteria, and more. TRW performed a Phase A study that included analyses of the science and technical (S&T) requirements, the development of facility functional requirements, and a conceptual design of the facility. The work that was performed under Stage 1 of the Phase A study and the results to date are summarized. In this stage, facility definition studies were conducted in sufficient detail to establish the technical feasibility of the candidate strawman experiments. The studies identified technical difficulties, identified required facility subsystems, surveyed existing technology studies and established preliminary facility weight, volume, power consumption, data systems, interface definition, and crew time requirements. The results of this study served as the basis for Stage 2 of the Phase A study in which a conceptual design and a reference design were performed. The results also served as a basis for a related study for a Gas-Grain Simulation Experiment Module (GGSEM), which is an apparatus intended to perform a subset of the GGSF experiments on board a low-Earth-orbiting platform.
14 CFR 171.11 - Maintenance and operations requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Keeping of station logs and other technical reports, and the submission of reports required by § 171.13... with procedures approved by the FAA at the time of commissioning, and shall report the results of the...) The owner shall close the facility upon receiving two successive pilot reports of its malfunctioning...
14 CFR 171.51 - Maintenance and operations requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...
14 CFR 171.51 - Maintenance and operations requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...
14 CFR 171.51 - Maintenance and operations requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...
14 CFR 171.11 - Maintenance and operations requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Keeping of station logs and other technical reports, and the submission of reports required by § 171.13... with procedures approved by the FAA at the time of commissioning, and shall report the results of the...) The owner shall close the facility upon receiving two successive pilot reports of its malfunctioning...
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Astronaut Tim Kopra (second from right) talks with workers in the Space Station Processing Facility about the Intravehicular Activity (IVA) constraints testing on the Italian-built Node 2, a future element of the International Space Station. . The second of three Station connecting modules, the Node 2 attaches to the end of the U.S. Lab and provides attach locations for several other elements. Kopra is currently assigned technical duties in the Space Station Branch of the Astronaut Office, where his primary focus involves the testing of crew interfaces for two future ISS modules as well as the implementation of support computers and operational Local Area Network on ISS. Node 2 is scheduled to launch on mission STS-120, Station assembly flight 10A.
Planning guidelines for computerized transaxial tomography (CT)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1976-11-23
Guidelines to assist local communities in review and decisionmaking related to computerized tomography (CT) 'head' and 'whole body' scanner needs and placement are presented. Although medical benefits for head scanning are well established, the proper role of whole body scanning in relation to other diagnostic procedures has not been determined. It is recommended that a 20 percent weighted consideration could be given to a potential CT scanner applicant's present capabilities in diagnostic 'body' work. The following guidelines for CT are recommended for use in assessing work qualifications of potential CT scanner applicants: (1) The facility must have an active neurosurgicalmore » service, with a geographically full-time board - certified neurosurgeon and at least 50 intracranial procedures performed annually. (2) The facility must have an active neurological service, with a geographically full-time board - certified neurologist. (3) The facility must have on staff a qualified neuroradiologist. It is recommended that the CT scanner utilization level be a minimum of 3,000 examinations per year per unit of new equipment. The applicant must submit financial data and must be committed to providing care to all patients, independent of ability to pay. The applicant must submit letters from area hospitals agreeing to utilize the scanner services. Additional criteria are given for body scanning work and for the number of scanners in a specific area. Detailed information is presented about scanner development and use in southeastern Pennsylvania and neighboring planning areas, and the cost of scanner operations is compared with revenues. The CT scanner committee membership is included.« less
Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)
NASA Technical Reports Server (NTRS)
Kurrus, R.; Stump, F.
1995-01-01
The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.
NASA Technical Reports Server (NTRS)
Mildice, J.; Sundberg, R.
1987-01-01
The object of this program was to design, build, test, and deliver a high frequency (20 kHz) Power System Testbed which would electrically approximate a single, separable power channel of an IOC Space Station. That program is described, including the technical background, and the results are discussed showing that the major assumptions about the characteristics of this class of hardware (size, mass, efficiency, control, etc.) were substantially correct. This testbed equipment was completed and delivered and is being operated as part of the Space Station Power System Test Facility.
Space Station Furnace Facility. Volume 2: Summary of technical reports
NASA Technical Reports Server (NTRS)
1992-01-01
The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics, and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. In order to accommodate the furnace modules with the resources required to operate, SSFF developed a design that meets the needs of the wide range of furnaces that are planned for the SSFF. The system design is divided into subsystems which provide the functions of interfacing to the SSF services, conditioning and control for furnace module use, providing the controlled services to the furnace modules, and interfacing to and acquiring data from the furnace modules. The subsystems, described in detail, are as follows: Power Conditioning and Distribution Subsystem; Data Management Subsystem; Software; Gas Distribution Subsystem; Thermal Control Subsystem; and Mechanical Structures Subsystem.
Integration of the White Sands Complex into a Wide Area Network
NASA Technical Reports Server (NTRS)
Boucher, Phillip Larry; Horan, Sheila, B.
1996-01-01
The NASA White Sands Complex (WSC) satellite communications facility consists of two main ground stations, an auxiliary ground station, a technical support facility, and a power plant building located on White Sands Missile Range. When constructed, terrestrial communication access to these facilities was limited to copper telephone circuits. There was no local or wide area communications network capability. This project incorporated a baseband local area network (LAN) topology at WSC and connected it to NASA's wide area network using the Program Support Communications Network-Internet (PSCN-I). A campus-style LAN is configured in conformance with the International Standards Organization (ISO) Open Systems Interconnect (ISO) model. Ethernet provides the physical and data link layers. Transmission Control Protocol and Internet Protocol (TCP/IP) are used for the network and transport layers. The session, presentation, and application layers employ commercial software packages. Copper-based Ethernet collision domains are constructed in each of the primary facilities and these are interconnected by routers over optical fiber links. The network and each of its collision domains are shown to meet IEEE technical configuration guidelines. The optical fiber links are analyzed for the optical power budget and bandwidth allocation and are found to provide sufficient margin for this application. Personal computers and work stations attached to the LAN communicate with and apply a wide variety of local and remote administrative software tools. The Internet connection provides wide area network (WAN) electronic access to other NASA centers and the world wide web (WWW). The WSC network reduces and simplifies the administrative workload while providing enhanced and advanced inter-communications capabilities among White Sands Complex departments and with other NASA centers.
Technical Data Interoperability (TDI) Pathfinder Via Emerging Standards
NASA Technical Reports Server (NTRS)
Conroy, Mike; Gill, Paul; Hill, Bradley; Ibach, Brandon; Jones, Corey; Ungar, David; Barch, Jeffrey; Ingalls, John; Jacoby, Joseph; Manning, Josh;
2014-01-01
The TDI project (TDI) investigates trending technical data standards for applicability to NASA vehicles, space stations, payloads, facilities, and equipment. TDI tested COTS software compatible with a certain suite of related industry standards for capabilities of individual benefits and interoperability. These standards not only esnable Information Technology (IT) efficiencies, but also address efficient structures and standard content for business processes. We used source data from generic industry samples as well as NASA and European Space Agency (ESA) data from space systems.
Multi-modality molecular imaging: pre-clinical laboratory configuration
NASA Astrophysics Data System (ADS)
Wu, Yanjun; Wellen, Jeremy W.; Sarkar, Susanta K.
2006-02-01
In recent years, the prevalence of in vivo molecular imaging applications has rapidly increased. Here we report on the construction of a multi-modality imaging facility in a pharmaceutical setting that is expected to further advance existing capabilities for in vivo imaging of drug distribution and the interaction with their target. The imaging instrumentation in our facility includes a microPET scanner, a four wavelength time-domain optical imaging scanner, a 9.4T/30cm MRI scanner and a SPECT/X-ray CT scanner. An electronics shop and a computer room dedicated to image analysis are additional features of the facility. The layout of the facility was designed with a central animal preparation room surrounded by separate laboratory rooms for each of the major imaging modalities to accommodate the work-flow of simultaneous in vivo imaging experiments. This report will focus on the design of and anticipated applications for our microPET and optical imaging laboratory spaces. Additionally, we will discuss efforts to maximize the daily throughput of animal scans through development of efficient experimental work-flows and the use of multiple animals in a single scanning session.
NASA Technical Reports Server (NTRS)
1974-01-01
The significant management and technical aspects of the JPL Project to develop and implement a 64-meter-diameter antenna at the Goldstone Deep Space Communications Complex in California, which was the first of the Advanced Antenna Systems of the National Aeronautics and Space Administration/Jet Propulsion Laboratory Deep Space Network are described. The original need foreseen for a large-diameter antenna to accomplish communication and tracking support of NASA's solar system exploration program is reviewed, and the translation of those needs into the technical specification of an appropriate ground station antenna is described. The antenna project is delineated by phases to show the key technical and managerial skills and the technical facility resources involved. There is a brief engineering description of the antenna and its closely related facilities. Some difficult and interesting engineering problems, then at the state-of-the-art level, which were met in the accomplishment of the Project, are described. The key performance characteristics of the antenna, in relation to the original specifications and the methods of their determination, are stated.
14 CFR 171.161 - Maintenance and operations requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... station logs and other technical reports, and the submission of reports required by § 171.163. (10... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the... and issue a NOTAM that the facility is out-of-service) upon receiving two successive pilot reports of...
NASA Technical Reports Server (NTRS)
2004-01-01
The NASA Glenn Research Center at Lewis Field, in partnership with U.S. industries, universities, and other Government institutions, is responsible for developing critical technologies that address national priorities in aeropropulsion and space applications. Our work is focused on research for new aeropropulsion technologies, aerospace power, microgravity science (fluids and combustion), electric propulsion, and communications technologies for aeronautics, space, and aerospace applications. As NASA s premier center for aeropropulsion, aerospace power, and turbomachinery, our role is to conduct world-class research and to develop key technologies. We contribute to economic growth and national security through safe, superior, and environmentally compatible U.S. civil and military aircraft propulsion systems. Our Aerospace Power Program supports all NASA Enterprises and major programs, including the International Space Station, Advanced Space Transportation, and new initiatives in human and robotic exploration. Glenn Research Center leads NASA s research in the microgravity science disciplines of fluid physics, combustion science, and acceleration measurement. Almost every space shuttle science mission has had an experiment managed by NASA Glenn, and we have conducted a wide array of similar experiments on the International Space Station. The Glenn staff consists of over 3200 civil service employees and support service contractor personnel. Scientists and engineers comprise more than half of our workforce, with technical specialists, skilled workers, and an administrative staff supporting them. We aggressively strive for technical excellence through continuing education, increased diversity in our workforce, and continuous improvement in our management and business practices so that we can expand the boundaries of aeronautics, space, and aerospace technology. Glenn Research Center is a unique facility located in northeast Ohio. Situated on 350 acres of land adjacent to the Cleveland Hopkins International Airport, Glenn comprises more than 140 buildings, including 24 major facilities and over 500 specialized research and test facilities. Additional facilities are located at Plum Brook Station, which is about 50 miles west of Cleveland. Plum Brook Station has four large, major, world-class facilities for space research available for Government and industry programs. Knowledge is the end product of our activities. The R&T reports help make this knowledge fully available to potential users the aircraft engine industry, the space industry, the energy industry, the automotive industry, the aerospace industry, and others. It is organized so that a broad cross section of the community can readily use it. Each article begins with a short introductory paragraph that should prove valuable for the layperson. These articles summarize the progress made during the year in various technical areas and portray the technical and administrative support associated with Glenn s technology programs. We hope that this information is useful to all. If additional information is desired, readers are encouraged to contact the researchers identified at the end of each article and to visit Glenn on the World Wide Web at http://www.grc.nasa.gov.
Turnaround operations analysis for OTV. Volume 2: Detailed technical report
NASA Technical Reports Server (NTRS)
1988-01-01
The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.
NASA Astrophysics Data System (ADS)
Tajedi, Noor Aqilah A.; Sukor, Nur Sabahiah A.; Ismail, Mohd Ashraf M.; Shamsudin, Shahrul A.
2017-10-01
The purpose of this paper is to compare the fire evacuation plan and preparation at the underground train stations in the different countries. The methodology for this study was using the extended questionnaire survey to investigate the Rapid Rail Sdn Bhd, Malaysia's fire safety plan and preparation at the underground train stations. There were four sections in the questionnaire which included (i) background of the respondents, (ii) the details on the train stations, safety instruction and fire evacuation exercises (iii) technical systems, installation and equipment at the underground stations and (iv) procedures and technical changes related to fire safety that had been applied by the operators. Previously, the respondents from the different train operator services in the developed countries had completed the questionnaires. This paper extends the response from the Rapid Rail Sdn Bhd to compare the emergency procedures and preparation for fire event with the developed countries. As a result, this study found that the equipment and facilities that provided at the underground train stations that operated by Rapid Rail are relevant for fire safety procedures and needs. The main advantage for Rapid Rail is the underground stations were designed with two or more entrances/exits that may perform better evacuation compare to one main entrance/exit train stations in the other developed countries.
NASA Technical Reports Server (NTRS)
Wappes, Loran J.; Sundberg, R.; Mildice, J.; Peterson, D.; Hushing, S.
1987-01-01
The object of this program was to design, build, test, and deliver a high-frequency (20-kHz) Power System Breadboard which would electrically approximate a pair of dual redundant power channels of an IOC Space Station. This report describes that program, including the technical background, and discusses the results, showing that the major assumptions about the characteristics of this class of hardware (size, mass, efficiency, control, etc.) were substantially correct. This testbed equipment has been completed and delivered to LeRC, where it is operating as a part of the Space Station Power System Test Facility.
47. View of "dry air inlets" to waveguides entering scanner ...
47. View of "dry air inlets" to waveguides entering scanner building 105. Dried air is generated under pressure by Ingersoll-Rand dehumidified/dessicator and compressor system. View is at entrance from passageway that links into corner of scanner building. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Research centrifuge accommodations on Space Station Freedom
NASA Technical Reports Server (NTRS)
Arno, Roger D.; Horkachuk, Michael J.
1990-01-01
Life sciences research using plants and animals on the Space Station Freedom requires the ability to maintain live subjects in a safe and low stress environment for long durations at microgravity and at one g. The need for a centrifuge to achieve these accelerations is evident. Programmatic, technical, and cost considerations currently favor a 2.5 meter diameter centrifuge located either in the end cone of a Space Station Freedom node or in a separate module. A centrifuge facility could support a mix of rodent, plant, and small primate habitats. An automated cage extractor could be used to remove modular habitats in pairs without stopping the main rotor, minimizing the disruption to experiment protocols. The accommodation of such a centrifuge facility on the Space Station represents a significant demand on the crew time, power, data, volume, and logistics capability. It will contribute to a better understanding of the effects of space flight on humans, an understanding of plant growth in space for the eventual production of food, and an understanding of the role of gravity in biological processes.
Investigation of Breakwater Stability at Presque Isle Peninsula Erie, Pennsylvania
1989-05-01
PRESQUE ISLE PENINSULA AD-A208 528 ERIE , PENNSYLVANIA by Peter J. Grace...STABILITY AT PRESQUE ISLE PENINSULA, ERIE . PENNSYLVANIA PART I: INTRODUCTION The Prototype 1. Harbor facilities at Erie , Pennsylvania , are protected...at Presque Isle Beaches, Erie , Pennsylvania ," Technical Report HL-83-15, US Army Engineer Waterways Experiment Station, Vicksburg, MS. Stevens, J.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-07
... Additional 20-Year Period and Record of Decision Notice is hereby given that the U.S. Nuclear Regulatory... its technical specifications. The notice also serves as the record of decision for the renewal of... from coal, natural gas, combination of alternatives, and the no action alternative. The factors...
None
2018-02-13
NETL's CT Scanner laboratory is equipped with three CT scanners and a mobile core logging unit that work together to provide characteristic geologic and geophysical information at different scales, non-destructively.
Landsat's international partners
Byrnes, Raymond A.
2012-01-01
Since the launch of the first Landsat satellite 40 years ago, International Cooperators (ICs) have formed a key strategic alliance with the U.S. Geological Survey (USGS) to not only engage in Landsat data downlink services but also to enable a foundation for scientific and technical collaboration. The map below shows the locations of all ground stations operated by the United States and IC ground station network for the direct downlink and distribution of Landsat 5 (L5) and Landsat 7 (L7) image data. The circles show the approximate area over which each station has the capability for direct reception of Landsat data. The red circles show the components of the L5 ground station network, the green circles show components of the L7 station network, and the dashed circles show stations with dual (L5 and L7) status. The yellow circles show L5 short-term ("campaign") stations that contribute to the USGS Landsat archive. Ground stations in South Dakota and Australia currently serve as the primary data capture facilities for the USGS Landsat Ground Network (LGN). The Landsat Ground Station (LGS) is located at the USGS Earth Resources Observation and Science (EROS) Center in Sioux Falls, South Dakota. The Alice Springs (ASN) ground station is located at the Geoscience Australia facility in Alice Springs, Australia. These sites receive the image data, via X-band Radio Frequency (RF) link, and the spacecraft housekeeping data, via S-band RF link. LGS also provides tracking services and a command link to the spacecrafts.
Support and Maintenance of the International Monitoring System network
NASA Astrophysics Data System (ADS)
Pereira, Jose; Bazarragchaa, Sergelen; Kilgour, Owen; Pretorius, Jacques; Werzi, Robert; Beziat, Guillaume; Hamani, Wacel; Mohammad, Walid; Brely, Natalie
2014-05-01
The Monitoring Facilities Support Section of the Provisional Technical Secretariat (PTS) has as its main task to ensure optimal support and maintenance of an array of 321 monitoring stations and 16 radionuclide laboratories distributed worldwide. Raw seismic, infrasonic, hydroacoustic and radionuclide data from these facilities constitutes the basic product delivered by the International Monitoring System (IMS). In the process of maintaining such a wide array of stations of different technologies, the Support Section contributes to ensuring station mission capability. Mission capable data availability according to the IMS requirements should be at least 98% annually (no more than 7 days down time per year per waveform stations - 14 continuous for radionuclide stations) for continuous data sending stations. In this presentation, we will present our case regarding our intervention at stations to address equipment supportability and maintainability, as these are particularly large activities requiring the removal of a substantial part of the station equipment and installation of new equipment. The objective is always to plan these activities while minimizing downtime and continuing to meet all IMS requirements, including those of data availability mentioned above. We postulate that these objectives are better achieved by planning and making use of preventive maintenance, as opposed to "run-to-failure" with associated corrective maintenance. We use two recently upgraded Infrasound Stations (IS39 Palau and IS52 BIOT) as a case study and establish a comparison between these results and several other stations where corrective maintenance was performed, to demonstrate our hypothesis.
An atmosphere protection subsystem in the thermal power station automated process control system
NASA Astrophysics Data System (ADS)
Parchevskii, V. M.; Kislov, E. A.
2014-03-01
Matters concerned with development of methodical and mathematical support for an atmosphere protection subsystem in the thermal power station automated process control system are considered taking as an example the problem of controlling nitrogen oxide emissions at a gas-and-oil-fired thermal power station. The combined environmental-and-economic characteristics of boilers, which correlate the costs for suppressing emissions with the boiler steam load and mass discharge of nitrogen oxides in analytic form, are used as the main tool for optimal control. A procedure for constructing and applying environmental-and-economic characteristics on the basis of technical facilities available in modern instrumentation and control systems is presented.
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, is lowered toward the base for installation. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station (ISS). Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
Eddy current X-Y scanner system
NASA Technical Reports Server (NTRS)
Kurtz, G. W.
1983-01-01
The Nondestructive Evaluation Branch of the Materials and Processes Laboratory became aware of a need for a miniature, portable X-Y scanner capable of performing eddy current or other nondestructive testing scanning operations such as ultrasonic, or small areas of flat plate. The technical description and operational theory of the X-Y scanner system designed and built to fulfill this need are covered. The scanner was given limited testing and performs according to its design intent, which is to scan flat plate areas of approximately 412 sq cm (64 sq in) during each complete cycle of scanning.
Conley, David B.; Tan, Bruce; Bendok, Bernard R.; Batjer, H. Hunt; Chandra, Rakesh; Sidle, Douglas; Rahme, Rudy J.; Adel, Joseph G.; Fishman, Andrew J.
2011-01-01
Precise and safe management of complex skull base lesions can be enhanced by intraoperative computed tomography (CT) scanning. Surgery in these areas requires real-time feedback of anatomic landmarks. Several portable CT scanners are currently available. We present a comparison of our clinical experience with three portable scanners in skull base and craniofacial surgery. We present clinical case series and the participants were from the Northwestern Memorial Hospital. Three scanners are studied: one conventional multidetector CT (MDCT), two digital flat panel cone-beam CT (CBCT) devices. Technical considerations, ease of use, image characteristics, and integration with image guidance are presented for each device. All three scanners provide good quality images. Intraoperative scanning can be used to update the image guidance system in real time. The conventional MDCT is unique in its ability to resolve soft tissue. The flat panel CBCT scanners generally emit lower levels of radiation and have less metal artifact effect. In this series, intraoperative CT scanning was technically feasible and deemed useful in surgical decision-making in 75% of patients. Intraoperative portable CT scanning has significant utility in complex skull base surgery. This technology informs the surgeon of the precise extent of dissection and updates intraoperative stereotactic navigation. PMID:22470270
2012-02-08
Office GRN Guam Road Network GWA Guam Waterworks Authority ICG Interagency Coordination Group JFY Japanese Fiscal Year JRM Joint...PAC) (Pacific) NCTS Naval Computer and Telecommunications Station NEPA National Environmental Policy Act NPDES National Pollutant Discharge...Elimination System OPNAV Operational Navy UFC Unified Facilities Criteria U.S. United States USC United States Code USDA United States
2004-03-05
KENNEDY SPACE CENTER, FLA. - The STS-114 crew stands underneath Discovery in the Orbiter Processing Facility. From left are Mission Specialist Stephen Robinson, Pilot James Kelly, Mission Specialist Charles Camarda, astronaut John Young, Commander Eileen Collins and Mission Specialists Andrew Thomas, Wendy Lawrence and Soichi Noguchi, who is with the Japanese Aerospace and Exploration Agency. Young is associate director, Technical, at Johnson Space Center. The crew is spending time becoming familiar with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.
2004-03-05
KENNEDY SPACE CENTER, FLA. - - In the Orbiter Processing Facility, STS-114 Mission Specialists Andrew Thomas, Soichi Noguchi and Charles Camarda greet astronaut John Young (far right), who flew on the first flight of Space Shuttle Columbia with Robert Crippen. Behind Camarda is Pilot James Kelly. Young is associate director, Technical, at Johnson Space Center. Noguchi represents the Japanese Aerospace and Exploration Agency. The STS-114 crew is spending time becoming familiar with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.
Holkenbrink, Patrick F.
1978-01-01
Landsat data are received by National Aeronautics and Space Administration (NASA) tracking stations and converted into digital form on high-density tapes (HDTs) by the Image Processing Facility (IPF) at the Goddard Space Flight Center (GSFC), Greenbelt, Maryland. The HDTs are shipped to the EROS Data Center (EDC) where they are converted into customer products by the EROS Data Center digital image processing system (EDIPS). This document describes in detail one of these products: the computer-compatible tape (CCT) produced from Landsat-1, -2, and -3 multispectral scanner (MSS) data and Landsat-3 only return-beam vidicon (RBV) data. Landsat-1 and -2 RBV data will not be processed by IPF/EDIPS to CCT format.
My Brother’s Keeper National Lab Week
2016-03-02
Mike Lane demonstrates a 3D scanner inside the NASA Kennedy Space Center Prototype Lab for students in the My Brother’s Keeper program. The Florida spaceport is one of six NASA centers that participated in My Brother’s Keeper National Lab Week. The event is a nationwide effort to bring youth from underrepresented communities into federal labs and centers for hands-on activities, tours and inspirational speakers. Sixty students from the nearby cities of Orlando and Sanford visited Kennedy, where they toured the Vehicle Assembly Building, the Space Station Processing Facility and the center’s innovative Swamp Works Labs. The students also had a chance to meet and ask questions of a panel of subject matter experts from across Kennedy.
NASA Technical Reports Server (NTRS)
Twombly, I. Alexander; Smith, Jeffrey; Bruyns, Cynthia; Montgomery, Kevin; Boyle, Richard
2003-01-01
The International Space Station will soon provide an unparalleled research facility for studying the near- and longer-term effects of microgravity on living systems. Using the Space Station Glovebox Facility - a compact, fully contained reach-in environment - astronauts will conduct technically challenging life sciences experiments. Virtual environment technologies are being developed at NASA Ames Research Center to help realize the scientific potential of this unique resource by facilitating the experimental hardware and protocol designs and by assisting the astronauts in training. The Virtual GloveboX (VGX) integrates high-fidelity graphics, force-feedback devices and real- time computer simulation engines to achieve an immersive training environment. Here, we describe the prototype VGX system, the distributed processing architecture used in the simulation environment, and modifications to the visualization pipeline required to accommodate the display configuration.
Reevaluation of air surveillance station siting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abbott, K.; Jannik, T.
2016-07-06
DOE Technical Standard HDBK-1216-2015 (DOE 2015) recommends evaluating air-monitoring station placement using the analytical method developed by Waite. The technique utilizes wind rose and population distribution data in order to determine a weighting factor for each directional sector surrounding a nuclear facility. Based on the available resources (number of stations) and a scaling factor, this weighting factor is used to determine the number of stations recommended to be placed in each sector considered. An assessment utilizing this method was performed in 2003 to evaluate the effectiveness of the existing SRS air-monitoring program. The resulting recommended distribution of air-monitoring stations wasmore » then compared to that of the existing site perimeter surveillance program. The assessment demonstrated that the distribution of air-monitoring stations at the time generally agreed with the results obtained using the Waite method; however, at the time new stations were established in Barnwell and in Williston in order to meet requirements of DOE guidance document EH-0173T.« less
Position and orientation tracking system
Burks, Barry L.; DePiero, Fred W.; Armstrong, Gary A.; Jansen, John F.; Muller, Richard C.; Gee, Timothy F.
1998-01-01
A position and orientation tracking system presents a laser scanning appaus having two measurement pods, a control station, and a detector array. The measurement pods can be mounted in the dome of a radioactive waste storage silo. Each measurement pod includes dual orthogonal laser scanner subsystems. The first laser scanner subsystem is oriented to emit a first line laser in the pan direction. The second laser scanner is oriented to emit a second line laser in the tilt direction. Both emitted line lasers scan planes across the radioactive waste surface to encounter the detector array mounted on a target robotic vehicle. The angles of incidence of the planes with the detector array are recorded by the control station. Combining measurements describing each of the four planes provides data for a closed form solution of the algebraic transform describing the position and orientation of the target robotic vehicle.
Position and orientation tracking system
Burks, B.L.; DePiero, F.W.; Armstrong, G.A.; Jansen, J.F.; Muller, R.C.; Gee, T.F.
1998-05-05
A position and orientation tracking system presents a laser scanning apparatus having two measurement pods, a control station, and a detector array. The measurement pods can be mounted in the dome of a radioactive waste storage silo. Each measurement pod includes dual orthogonal laser scanner subsystems. The first laser scanner subsystem is oriented to emit a first line laser in the pan direction. The second laser scanner is oriented to emit a second line laser in the tilt direction. Both emitted line lasers scan planes across the radioactive waste surface to encounter the detector array mounted on a target robotic vehicle. The angles of incidence of the planes with the detector array are recorded by the control station. Combining measurements describing each of the four planes provides data for a closed form solution of the algebraic transform describing the position and orientation of the target robotic vehicle. 14 figs.
Regulation of X-Ray Security Scanners in Michigan.
Parry, Donald E
2016-02-01
In January of 2013 the Transportation Security Administration (TSA) ordered the removal of x-ray security scanners from airports by June of 2013. Since that time several of these scanners have been purchased at a reduced cost by various state and county governments for use in screening individuals entering or leaving their facilities. To address this issue the Radiation Safety Section of the State of Michigan drafted a set of registration conditions for facilities to follow when using these security scanners. Inspection procedures and measurement protocols were developed to estimate the dose to screened individuals. Inspections were performed on nine of the 16 registered backscatter scanners in the state and the one transmission scanner. The average estimated effective dose to screened individuals was ∼11 nSv for a two view scan from a backscatter system. The effective dose was 0.446 μSv, 0.330 μSv, and 0.150 μSv for a transmission system operated in the high, medium, and low dose modes, respectively. The limit suggested in the new registration condition is 0.25 μSv for a general use system and 10 μSv for a limited use system.
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, technicians help guide the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, into place for installation on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station (ISS). Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, is ready to be installed on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station ISS. Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, technicians help guide the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, into place for installation on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station (ISS). Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
9. View of back side of radar scanner building no. ...
9. View of back side of radar scanner building no. 106 showing passageway links to other buildings east and west, and DR 3 antenna in background. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
10. View of back side of radar scanner building no. ...
10. View of back side of radar scanner building no. 104 showing passageway links to other building to east and DR 1 antenna in background. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
50. View of waveguides beginning to move toward two radar ...
50. View of waveguides beginning to move toward two radar scanner switches (two per radar scanner building) by vertical bends; also tuning devices are located here. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
21. View from south to southerly face of scanner building ...
21. View from south to southerly face of scanner building 104 showing building radius. Radius of building face matches radius of DR antenna systems. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
20. View from northeast to southwest side of scanner building ...
20. View from northeast to southwest side of scanner building 104 showing two waveguide termination faces (fiberglass light bands on left of photograph). - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
NASA Astrophysics Data System (ADS)
Grenard, P.
2009-04-01
The International Monitoring System (IMS) for the Comprehensive Nuclear Test-ban-Treaty Organization is a global Network of stations for detecting and providing evidence of possible nuclear explosions. Upon completion, the IMS will consist of 321 monitoring facilities and 16 radionuclide laboratories distributed worldwide in locations designated by the Treaty. Many of these sites are located in areas that are remote and difficult to access, posing major engineering and logistical challenges. The IMS uses seismic, hydroacoustic and infrasound monitoring waveform technologies to detect signals released from an explosion or a naturally occurring event (e.g. earthquakes) in the underground, underwater and atmospheric environments. The radionuclide technology as an integral part of the IMS uses air samples to collect particular matter from the atmosphere. Samples are then analyzed for evidence of physical products created by a nuclear explosion and carried through the atmosphere. The certification process of the IMS stations assures their compliance with the IMS technical requirements. In 2008 significant progress was made towards the completion of the IMS Network. So far 75% of the IMS stations have been built and certified.
Navigation Operational Concept,
1991-08-01
Area Control Facility AFSS Automated Flight Service Station AGL Above Ground Level ALSF-2 Approach Light System with Sequence Flasher Model 2 ATC Air...equipment contributes less than 0.30 NM error at the missed approach point. This total system use accuracy allows for flight technical error of up to...means for transition from instrument to visual flight . This function is provided by a series of standard lighting systems : the Approach Lighting
NS001MS - Landsat-D thematic mapper band aircraft scanner
NASA Technical Reports Server (NTRS)
Richard, R. R.; Merkel, R. F.; Meeks, G. R.
1978-01-01
The thematic mapper is a multispectral scanner which will be launched aboard Landsat-D in the early 1980s. Compared with previous Landsat scanners, this instrument will have an improved spatial resolution (30 m) and new spectral bands. Designated NS001MS, the scanner is designed to duplicate the thematic mapper spectral bands plus two additional bands (1.0 to 1.3 microns and 2.08 to 2.35 microns) in an aircraft scanner for evaluation and investigation prior to design and launch of the final thematic mapper. Applicable specifications used in defining the thematic mapper were retained in the NS001MS design, primarily with respect to spectral bandwidths, noise equivalent reflectance, and noise equivalent difference temperature. The technical design and operational characteristics of the multispectral scanner (with thematic mapper bands) are discussed.
ARN Integrated Retail Module (IRM) & 3D Whole Body Scanner System at Fort Carson, Colorado
2006-12-01
the Central Issue Facility (CIF), Ft. Carson, CO; and, 4) Develop and validate dynamic local tariffs. Additional information on Apparel...Scanner; 3) Integrate 3D Whole Body scanning technology with the ARN Integrated Retail Module (IRM) for clothing issue at the Central Issue Facility ...CIF), Ft. Carson, CO; and, 4) Develop and validate dynamic local tariffs. The main goals of the ARN 3D scanning research initiative at the Ft
Use of PET/CT scanning in cancer patients: technical and practical considerations
2005-01-01
This overview of the oncologic applications of positron emission tomography (PET) focuses on the technical aspects and clinical applications of a newer technique: the combination of a PET scanner and a computed tomography (CT) scanner in a single (PET/CT) device. Examples illustrate how PET/CT contributes to patient care and improves upon the previous state-of-the-art method of comparing a PET scan with a separate CT scan. Finally, the author presents some of the results from studies of PET/CT imaging that are beginning to appear in the literature. PMID:16252023
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, is moved toward the base, in the background. The arm will be installed on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station (ISS). Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, technicians aid with the lowering of the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre, toward the base. The arm will be installed on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station (ISS). Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
2007-10-01
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, technicians adjust the cables of an overhead crane on the starboard arm of the Special Purpose Dexterous Manipulator, known as Dextre. The arm will be moved to and installed on the base. Dextre is a sophisticated dual-armed robot, which is part of Canada's contribution to the International Space Station ISS. Along with Canadarm2, whose technical name is the Space Station Remote Manipulator System, and a moveable work platform called the Mobile Base System, these three elements form a robotic system called the Mobile Servicing System, or MSS. The three components have been designed to work together or independently. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14. Photo credit: NASA/George Shelton
An investigation of acoustic noise requirements for the Space Station centrifuge facility
NASA Technical Reports Server (NTRS)
Castellano, Timothy
1994-01-01
Acoustic noise emissions from the Space Station Freedom (SSF) centrifuge facility hardware represent a potential technical and programmatic risk to the project. The SSF program requires that no payload exceed a Noise Criterion 40 (NC-40) noise contour in any octave band between 63 Hz and 8 kHz as measured 2 feet from the equipment item. Past experience with life science experiment hardware indicates that this requirement will be difficult to meet. The crew has found noise levels on Spacelab flights to be unacceptably high. Many past Ames Spacelab life science payloads have required waivers because of excessive noise. The objectives of this study were (1) to develop an understanding of acoustic measurement theory, instruments, and technique, and (2) to characterize the noise emission of analogous Facility components and previously flown flight hardware. Test results from existing hardware were reviewed and analyzed. Measurements of the spectral and intensity characteristics of fans and other rotating machinery were performed. The literature was reviewed and contacts were made with NASA and industry organizations concerned with or performing research on noise control.
Integration Of An MR Image Network Into A Clinical PACS
NASA Astrophysics Data System (ADS)
Ratib, Osman M.; Mankovich, Nicholas J.; Taira, Ricky K.; Cho, Paul S.; Huang, H. K.
1988-06-01
A direct link between a clinical pediatric PACS module and a FONAR MRI image network was implemented. The original MR network combines together the MR scanner, a remote viewing station and a central archiving station. The pediatric PACS directly connects to the archiving unit through an Ethernet TCP-IP network adhering to FONAR's protocol. The PACS communication software developed supports the transfer of patient studies and the patient information directly from the MR archive database to the pediatric PACS. In the first phase of our project we developed a package to transfer data between a VAX-111750 and the IBM PC I AT-based MR archive database through the Ethernet network. This system served as a model for PACS-to-modality network communication. Once testing was complete on this research network, the software and network hardware was moved to the clinical pediatric VAX for full PACS integration. In parallel to the direct transmission of digital images to the Pediatric PACS, a broadband communication system in video format was developed for real-time broadcasting of images originating from the MR console to 8 remote viewing stations distributed in the radiology department. These analog viewing stations allow the radiologists to directly monitor patient positioning and to select the scan levels during a patient examination from remote locations in the radiology department. This paper reports (1) the technical details of this implementation, (2) the merits of this network development scheme, and (3) the performance statistics of the network-to-PACS interface.
NASA Technical Reports Server (NTRS)
Hadaway, James B.; Connatser, Robert; Cothren, Bobby; Johnson, R. B.
1993-01-01
Work performed by the University of Alabama in Huntsville's (UAH) Center for Applied Optics (CAO) entitled Atomic Research is documented. Atomic oxygen (AO) effects on materials have long been a critical concern in designing spacecraft to withstand exposure to the Low Earth Orbit (LEO) environment. The objective of this research effort was to provide technical expertise in the design of instrumentation and experimental techniques for analyzing materials exposed to atomic oxygen in accelerated testing at NASA/MSFC. Such testing was required to answer fundamental questions concerning Space Station Freedom (SSF) candidate materials and materials exposed to atomic oxygen aboard the Long-Duration Exposure Facility (LDEF). The primary UAH task was to provide technical design, review, and analysis to MSFC in the development of a state-of-the-art 5eV atomic oxygen beam facility required to simulate the RAM-induced low earth orbit (LEO) AO environment. This development was to be accomplished primarily at NASA/MSFC. In support of this task, contamination effects and ultraviolet (UV) simulation testing was also to be carried out using NASA/MSFC facilities. Any materials analysis of LDEF samples was to be accomplished at UAH.
NASA Technical Reports Server (NTRS)
1980-01-01
Candidate satellite power system (SPS) concepts were identified and evaluated in terms of technical and cost factors. A number of alternative technically feasible approaches and system concepts were investigated. A reference system was defined to facilitate economic, environmental, and societal assessments by the Department of Energy. All elements of the reference system were defined including the satellite and all its subsystems, the orbital construction and maintenance bases, all elements of the space transportation system, the ground receiving station, and the associated industrial facilities for manufacturing the required hardware. The reference conclusions and remaining issues are stated for the following topical areas: system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.
77 FR 57086 - Radio Broadcasting Services; AM or FM Proposals To Change The Community of License.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-17
...The following applicants filed AM or FM proposals to change the community of license: ALEXANDRA COMMUNICATIONS, INC., Station KRKZ- FM, Facility ID 189499, BPH-20120725AHL, From NETARTS, OR, To CHINOOK, WA; ALEXANDRA COMMUNICATIONS, INC., Station KTIL, Facility ID 50554, BMP-20120725AHO, From TILLAMOOK, OR, To NETARTS, OR; BIRACH BROADCASTING CORPORATION, Station NEW, Facility ID 136069, BMP- 20120813ABI, From TERRE HAUTE, IN, To PEOTONE, IN; BRAHMIN BROADCASTING CORPORATION, Station KPAD, Facility ID 166006, BMPH-20111230ABO, From RAWLINS, WY, To WHEATLAND, WY; CITICASTERS LICENSES, INC., Station WOGB, Facility ID 89, BPH-20120720ACQ, From KAUKAUNA, WI, To REEDSVILLE, WI; CLEAR CHANNEL BROADCASTING LICENSES, INC., Station WQNS, Facility ID 41008, BPH-20120807ACK, From WAYNESVILLE, NC, To WOODFIN, NC; CORPORATION FOR NATIVE BROADCASTING, Station KXSW, Facility ID 171940, BPED-20120717AAL, From SISSETON, SD, To AGENCY VILLAGE, SD; CRAIN MEDIA GROUP, LLC, Station KEAZ, Facility ID 48748, BPH-20120716ADV, From HEBER SPRINGS, AR, To KENSETT, AR; DAIJ MEDIA, LLC, Station KJOZ, Facility ID 20625, BP-20120731AAA, From CONROE, TX, To FRIENDSWOOD, TX; ENTERTAINMENT MEDIA TRUST, DENNIS J.WATKINS, TRUSTEE, Station KQQZ, Facility ID 5281, BMP-20120628AAL, From FAIRVIEW HEIGHTS, IL, To DESOTO, MO; GOOD TIDINGS TRUST, INC., Station WAYR, Facility ID 24625, BP-20120724ABN, From ORANGE PARK, FL, To FLEMING ISLAND, FL; IHR EDUCATIONAL BROADCASTING, Station NEW, Facility ID 160745, BMP-20120821AAF, From MERRILL, OR, To ALTAMONT, OR; JER LICENSES, LLC, Station NEW, Facility ID 190382, BNPH-20120529ALR, From GUNNISON, CO, To DOTSERO, CO; KIERTRON, INC., Station KBRT, Facility ID 34588, BMP-20120809AAQ, From AVALON, CA, To COSTA MESA, CA; MALVERN ENTERTAINMENT CORPORATION, Station KHAN, Facility ID 164210, BPH-20120716ADT, From KENSETT, AR, To MAGNESS, AR; SYNERGY BROADCAST NORTH DAKOTA, LLC, Station KLTQ, Facility ID 164305, BPH-20120727AHW, From NEW ENGLAND, ND, To BEULAH, ND; SYNERGY BROADCAST NORTH DAKOTA, LLC, Station KQLZ, Facility ID 166059, BPH-20120727AID, From BEULAH, ND, To NEW ENGLAND, ND; THE OPP BROADCASTING CO., INC., Station WAMI- FM, Facility ID 66211, BPH-20120612ACO, From FORT DEPOSIT, AL, To OPP, AL; TRI STATE RADIO, LLC, Station KYLZ, Facility ID 170181, BPH- 20120807ACF, From PAROWAN, UT, To ENOCH, UT.
NASA Technical Reports Server (NTRS)
Howard, E. Davis, III
1990-01-01
MITRE Corporation's, A Review of Space Station Freedom Program Capabilities for the Development and Application of Advanced Automation, cites as a critical issue the following situation, extant at the NASA facilities visited in the course of preparing the review: The major issues noted with regard to design and research facilities deal with cooperative problem solving, technology transfer, and communication between these facilities. While the authors were visiting lab and test beds to collect information, personnel at many of these facilities were interested in any information they could collect on activities at other facilities. A formal means of gathering this information could not be identified by these personnel. While communication between some facilities was taking place or was planned, for technology transfer or coordination of schedules (e.g., for SADP demonstrations), poor communication between these facilities could lead to a lack of technical standards, duplication of effort, poorly defined interfaces, scheduling problems, and increased cost. Formal mechanisms by which effective communication and cooperative problem solving can take place, and information can be disseminated, must be defined. A solution is proposed for the communications aspects of the issues addressed above; and offered at the same time a solution which can prove effective in dealing with some of the problems being encountered with expertise being lost via retirement or defection to the private sector. The proffered recommendations are recognizably cost-effective and tap the rising sector of expert knowledge being produced by the American academic community.
Finding international Landsat data online
,
1997-01-01
The Global Land Information System (GLIS) lists Landsat multispectral scanner (MSS) and thematic mapper (TM) data available from the participating international ground stations shown below. These databases of the Landsat Ground Station Operations Working Group (LGSOWG) can be searched, but not ordered, using GLIS. To order Landsat scenes identified on the GLIS data search, contact the international ground station where those scenes are available, indicated by the second character of the Entity ID.
Investigation of a Combined Surveying and Scanning Device: The Trimble SX10 Scanning Total Station
Lachat, Elise; Landes, Tania; Grussenmeyer, Pierre
2017-01-01
Surveying fields from geosciences to infrastructure monitoring make use of a wide range of instruments for accurate 3D geometry acquisition. In many cases, the Terrestrial Laser Scanner (TLS) tends to become an optimal alternative to total station measurements thanks to the high point acquisition rate it offers, but also to ever deeper data processing software functionalities. Nevertheless, traditional surveying techniques are valuable in some kinds of projects. Nowadays, a few modern total stations combine their conventional capabilities with those of a laser scanner in a unique device. The recent Trimble SX10 scanning total station is a survey instrument merging high-speed 3D scanning and the capabilities of an image-assisted total station. In this paper this new instrument is introduced and first compared to state-of-the-art image-assisted total stations. The paper also addresses the topic of various laser scanning projects and the delivered point clouds are compared with those of other TLS. Directly and indirectly georeferenced projects have been carried out and are investigated in this paper, and a polygonal traverse is performed through a building. Comparisons with the results delivered by well-established survey instruments show the reliability of the Trimble SX10 for geodetic work as well as for scanning projects. PMID:28362319
Technical accomplishments of the NASA Lewis Research Center, 1989
NASA Technical Reports Server (NTRS)
1990-01-01
Topics addressed include: high-temperature composite materials; structural mechanics; fatigue life prediction for composite materials; internal computational fluid mechanics; instrumentation and controls; electronics; stirling engines; aeropropulsion and space propulsion programs, including a study of slush hydrogen; space power for use in the space station, in the Mars rover, and other applications; thermal management; plasma and radiation; cryogenic fluid management in space; microgravity physics; combustion in reduced gravity; test facilities and resources.
11. View of south side of radar scanner building no. ...
11. View of south side of radar scanner building no. 104 showing personnel exit door at side building, showing DR 1 antenna from oblique angle on foundation berm with DR 2 and DR 3 antennae in background. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Advanced scanners and imaging systems for earth observations. [conferences
NASA Technical Reports Server (NTRS)
1973-01-01
Assessments of present and future sensors and sensor related technology are reported along with a description of user needs and applications. Five areas are outlined: (1) electromechanical scanners, (2) self-scanned solid state sensors, (3) electron beam imagers, (4) sensor related technology, and (5) user applications. Recommendations, charts, system designs, technical approaches, and bibliographies are included for each area.
SeaWiFS technical report series. Volume 4: An analysis of GAC sampling algorithms. A case study
NASA Technical Reports Server (NTRS)
Yeh, Eueng-Nan (Editor); Hooker, Stanford B. (Editor); Hooker, Stanford B. (Editor); Mccain, Charles R. (Editor); Fu, Gary (Editor)
1992-01-01
The Sea-viewing Wide Field-of-view Sensor (SeaWiFS) instrument will sample at approximately a 1 km resolution at nadir which will be broadcast for reception by realtime ground stations. However, the global data set will be comprised of coarser four kilometer data which will be recorded and broadcast to the SeaWiFS Project for processing. Several algorithms for degrading the one kilometer data to four kilometer data are examined using imagery from the Coastal Zone Color Scanner (CZCS) in an effort to determine which algorithm would best preserve the statistical characteristics of the derived products generated from the one kilometer data. Of the algorithms tested, subsampling based on a fixed pixel within a 4 x 4 pixel array is judged to yield the most consistent results when compared to the one kilometer data products.
Advancing automation and robotics technology for the Space Station Freedom and for the U.S. economy
NASA Technical Reports Server (NTRS)
1993-01-01
In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on Space Station Freedom. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the sixteenth in a series of progress updates and covers the period between 15 Sep. 1992 - 16 Mar. 1993. The report describes the progress made by Levels 1, 2, and 3 of the Space Station Freedom in developing and applying advanced automation and robotics technology. Emphasis was placed upon the Space Station Freedom Program responses to specific recommendations made in ATAC Progress Report 15; and includes a status review of Space Station Freedom Launch Processing facilities at Kennedy Space Center. Assessments are presented for these and other areas as they apply to the advancement of automation and robotics technology for Space Station Freedom.
NASA Astrophysics Data System (ADS)
Baribeau, François; Bubel, Annie; Dumont, Guillaume; Vachon, Carl; Lépine, André; Rochefort, Stéphane; Massicotte, Martin; Buteau-Vaillancourt, Louis; Gallant, Pascal; Mermut, Ozzy
2017-03-01
Hospitals currently rely on simple human visual inspection for assessing cleanliness of surgical instruments. Studies showed that surgical site infections are in part attributed to inadequate cleaning of medical devices. Standards groups recognize the need to objectively quantify the amount of residues on surgical instruments and establish guidelines. We developed a portable technology for the detection of contaminants on surgical instruments through fluorescence following cleaning. Weak fluorescence signals are usually detected in the obscurity only with the lighting of the excitation source. The key element of this system is that it works in ambient lighting conditions, a requirement to not disturb the normal workflow of hospital reprocessing facilities. A biocompatible fluorescent dye is added to the detergent and labels the proteins of organic residues. It is resistant to the harsh environment in a washer-disinfector. Two inspection devices have been developed with a 488nm laser as the excitation source: a handheld scanner and a tabletop station using spectral-domain and time-domain ambient light cancellation schemes. The systems are eye safe and equipped with image processing and interfacing software to provide visual or audible warnings to the operator based on a set of adjustable signal thresholds. Micron-scale residues are detected by the system which can also evaluate soil size and mass. Unlike swabbing, it can inspect whole tools in real-time. The technology has been validated in an independent hospital decontamination research laboratory. It also has potential applications in the forensics, agro-food, and space fields. Technical aspects and results will be presented and discussed.
Space station needs attributes and architectural options study costing working group briefing
NASA Technical Reports Server (NTRS)
1983-01-01
Individuals in the United States who understand the promise of materials processing in space and who also are senior technical personnel associated with commercial firms that process materials: (1) endorsed the concept of a space station as a desirable national asset; (2) stated that a commercial MPS research program is mandatory to extend commericalization of space for materials processing; and (3) described in general terms a national research laboratory and free flying facilities that are needed. Participants agreed that industry R&D is motivated largely by market pull rather than by technology push, that initial interest is low-g materials research; and that to farther, commercial market assurance (a salable product) is a must.
Spaceflight Safety on the North Coast of America
NASA Technical Reports Server (NTRS)
Ciancone, Michael L.; Havenhill, Maria T.; Terlep, Judith A.
1996-01-01
Spaceflight Safety (SFS) engineers at NASA Lewis Research Center (LeRC) are responsible for evaluating the microgravity fluids and combustion experiments, payloads and facilities developed at NASA LeRC which are manifested for spaceflight on the Space Shuttle, the Russian space station Mir, and/or the International Space Station (ISS). An ongoing activity at NASA LeRC is the comprehensive training of its SFS engineers through the creation and use of safety tools and processes. Teams of SFS engineers worked on the development of an Internet website (containing a spaceflight safety knowledge database and electronic templates of safety products) and the establishment of a technical peer review process (known as the Safety Assurance for Lewis Spaceflight Activities (SALSA) review).
Feistenauer, Susan; Sander, Ingrid; Schmidt, Jörg; Zahradnik, Eva; Raulf, Monika; Brielmeier, Markus
2014-01-01
Animal allergens constitute a serious health risk in laboratory animal facilities. To assess possibilities for allergen reduction by technical and organizational measures, we studied personnel exposure to mouse urinary aeroallergens in an animal facility with a holding capacity of 30,000 cages. Short-term (2 h) and intermediate-term (12 h) stationary samples (n = 107) and short-term (2 h) personnel samples (n = 119) were collected on polytetrafluorethylene filters by using air pumps. Long-term (14 d) stationary dust samples containing airborne allergens (n = 165) were collected with electrostatic dust fall collectors (EDC). Mouse allergens were quantified by ELISA. Personnel samples were collected during bedding disposal and refilling of clean cages as well as during cage changing with and without use of cage-changing station. Animal rooms were equipped with either open cages, cages with a soft filter top, cages with a rigid filter top (static microisolation caging), or with individually ventilated cages (IVC) with either a sealed or nonsealed lid, each in positive- or negative-pressure mode. Highest personnel allergen exposure was detected during cage change and emptying of soiled cages. Allergen concentrations were lowest in rooms with sealed IVC under positive or negative pressure, with unsealed IVC under negative pressure, and with static microisolation caging. The use of cage-changing stations and a vacuum bedding-disposal system reduced median personnel exposures 14- to 25-fold, respectively. Using sealed IVC and changing stations minimized allergen exposure, indicating that state-of-the-art equipment reduces exposure to mouse allergens and decreases health risks among animal facility personnel. PMID:25199090
NASA Technical Reports Server (NTRS)
Ebert, D. H.; Chase, P. E.; Dye, J.; Fahline, W. C.; Johnson, R. H.
1973-01-01
The impact of a conical scan versus a linear scan multispectral scanner (MSS) instrument on a small local-user data processing facility was studied. User data requirements were examined to determine the unique system rquirements for a low cost ground system (LCGS) compatible with the Earth Observatory Satellite (EOS) system. Candidate concepts were defined for the LCGS and preliminary designs were developed for selected concepts. The impact of a conical scan MSS versus a linear scan MSS was evaluated for the selected concepts. It was concluded that there are valid user requirements for the LCGS and, as a result of these requirements, the impact of the conical scanner is minimal, although some new hardware development for the LCGS is necessary to handle conical scan data.
Moths on the Flatbed Scanner: The Art of Joseph Scheer
Buchmann, Stephen L.
2011-01-01
During the past decade a few artists and even fewer entomologists discovered flatbed scanning technology, using extreme resolution graphical arts scanners for acquiring high magnification digital images of plants, animals and inanimate objects. They are not just for trip receipts anymore. The special attributes of certain scanners, to image thick objects is discussed along with the technical features of the scanners including magnification, color depth and shadow detail. The work of pioneering scanner artist, Joseph Scheer from New York's Alfred University is highlighted. Representative flatbed-scanned images of moths are illustrated along with techniques to produce them. Collecting and preparing moths, and other objects, for scanning are described. Highlights of the Fulbright sabbatical year of professor Scheer in Arizona and Sonora, Mexico are presented, along with comments on moths in science, folklore, art and pop culture. The use of flatbed scanners is offered as a relatively new method for visualizing small objects while acquiring large files for creating archival inkjet prints for display and sale. PMID:26467835
Integrated Procedures for Flight and Ground Operations Using International Standards
NASA Technical Reports Server (NTRS)
Ingalls, John
2011-01-01
Imagine astronauts using the same Interactive Electronic Technical Manuals (IETM's) as the ground personnel who assemble or maintain their flight hardware, and having all of that data interoperable with design, logistics, reliability analysis, and training. Modern international standards and their corresponding COTS tools already used in other industries provide a good foundation for streamlined technical publications in the space industry. These standards cover everything from data exchange to product breakdown structure to business rules flexibility. Full Product Lifecycle Support (PLCS) is supported. The concept is to organize, build once, reuse many ways, and integrate. This should apply to all future and some current launch vehicles, payloads, space stations/habitats, spacecraft, facilities, support equipment, and retrieval ships.
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
NASA Astrophysics Data System (ADS)
Podwojewska, Magdalena
2017-10-01
After years of neglect and underinvestment, the Polish railways are now witnessing a rapid modernization of both their technical facilities and rolling stock. However, this is true only of the main railway lines connecting major urban complexes. It is worth pointing out that a great number of secondary lines, railway stations and halts still has not been covered by the transformation process. Railway facilities, warehouses and service features are in decay. Rapid technological developments have caused numerous architectural structures of historical interest and service features to fall out of use. There are historical railway facilities dating back to the late 19th or early 20th centuries, whose condition is constantly deteriorating. The only way to save these structures is to change the manner, in which they are being used, and attract new investors and operators. The adaptation of buildings may be carried out in a number of ways by following different strategies. The process depends on the structure’s current condition and significance for the railway network. The facilities which are disused as a result of technological changes in the rolling stock and infrastructure include workshops, steam locomotive bays, turntables and warehouses. Their size and location within a city make them a perfect place for commercial services, exhibitions, heritage sites, concerts and other events attracting great numbers of people. Other strategies may be used for constructions located next to railways lines, whose role has declined. Such constructions include small railway stations, warehouses, reloading and forwarding facilities, railway ramps, railway staff buildings as well as residences for railway employees. Railway stations located at large junctions can handle passenger traffic or freight loading operations. As well as acting as the only window to the world, railway stations in small towns housed all the services available in the place. At the same time, they served as meeting spots, community centres and places of particular social importance. Therefore, successful renewal requires adaptation and functional conversion in order to cater to the needs of the inhabitants and visiting travellers. Such activities should focus on architectural, social and economic spaces. This paper presents small railway stations of historical value with a view to their adaptive potential, as well as examples of completed adaptation projects.
2004-03-05
KENNEDY SPACE CENTER, FLA. - The STS-114 crew stands in front of the operations desk in the Orbiter Processing Facility. At far right is astronaut John Young, who flew on the first flight of Space Shuttle Columbia with Robert Crippen. Young is associate director, Technical, at Johnson Space Center. From left are Young’s pilot; STS-114 Commander Eileen Collins; Mission Specialists Andrew Thomas, Soichi Noguchi and Stephen Robinson; Pilot James Kelly; and Mission Specialist Charles Camarda. Noguchi represents the Japanese Aerospace and Exploration Agency. The STS-114 crew is spending time becoming familiar with Shuttle and mission equipment. The mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.
LANDSAT-4 to ground station interface description
NASA Technical Reports Server (NTRS)
1983-01-01
The LANDSAT 4 to ground station interface is described in detail. The radiometric specifications, internal calibration, sensor output format, and data processing constants for the multispectral scanner and the thematic mapper are discussed. The mission payload telemetry, onboard computer telemetry, and engineering telemetry formats are described. In addition, the telemetry time signals and the onboard clock resetting procedure are addressed.
Data Collection and Validation of Newport Beach Hydrogen Station Performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kashuba, Michael John
2012-10-15
The hydrogen fueling station located at 1600 Jamboree Road in Newport Beach, California was designed and built to refuel light duty fuel cell electric vehicles (FCEVs). The station features the on-site generation of hydrogen through a small scale natural gas steam methane reformer (SMR). All the hydrogen related equipment was added to an existing retail gasoline/diesel station. The station is an early demonstration of what the footprint and equipment arrangement of a retail on-site SMR facility might look like. Commercial customer FCEV leases have only just begun in the last two years or so. And, individual Original Equipment Manufacturer (OEM)more » vehicle lease fleets are relatively small. Only a few hundred FCEVs are on the road in California. As a result, hydrogen throughput is relatively low at the few early pre-commercial hydrogen stations that are currently open. Therefore the stations are underutilized. This project aims to collect additional station data to allow the operator to potentially adjust various operational parameters in order to improve the overall efficiency of the station and lower operation and maintenance costs and to help improve air quality and reduce greenhouse gas emissions. Due to unforeseen delays, technical challenges and personnel reassignments the project was delayed to the point that the award was allowed to expire.« less
Multi-spectral Line Scanner image of Northern California
1973-06-22
S73-34295B (June 1973) --- A vertical view of a portion of northern California reproduced from data taken from the Skylab Multispectral Scanner, experiment S192, in the Skylab space station in Earth orbit. This view is the most westerly one-third of Frame No. 001, Roll No. 518, S192, Skylab 2. Frame No. 001 extends from the Pacific coast at the Eureka area southeasterly 175 nautical miles to the Feather River drainage basin. Included in this view are Lake Shasta, Sacramento River Valley, Redding and Red Bluff. This non-photographic image is a color composite of channels 2 (visible), 7, and 12 (infrared) from the Earth Resources Experiments Package (EREP) S192 scanner. The scanner techniques assist with spectral signature identification and mapping of ground truth targets in agriculture, forestry, geology, hydrology and oceanography. Photo credit: NASA
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
NASA Technical Reports Server (NTRS)
1971-01-01
The development of commercial manufacturing and research activities in space is discussed. The capability is to be installed in space stations in order to exploit the extended free fall which makes many novel manipulations of materials possible and alters the behavior of certain chemical and physical processes. The broad objectives are: (1) to develop technical basis required for commercial use of manned space facilities, (2) to provide indirect economic benefits by exploiting advantages of space laboratory facilities to solve critical experimental problems, and (3) to initiate manufacturing operations in space by private enterprise for commercial purposes and by agencies of the Government for public purposes.
90. View of scanner building no. 104 showing emplacement process ...
90. View of scanner building no. 104 showing emplacement process for one-half of upper radar switch housing body. RCA Services Company 6 September, 1960, official photograph BMEWS Project by unknown photograph, Photographic Services, Riverton, NJ, BMEWS, clear as negative no. a-1163. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
54. View from ground level in building no. 105 showing ...
54. View from ground level in building no. 105 showing lower radar scanner switch at open port door. Note incoming waveguide and control switch at lower left of photograph and note several waveguides leaving top of scanner switch around the circumference of switch. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Nimbus 7 Coastal Zone Color Scanner (CZCS). Level 1 data product users' guide
NASA Technical Reports Server (NTRS)
Williams, S. P.; Szajna, E. F.; Hovis, W. A.
1985-01-01
The coastal zone color scanner (CZCS) is a scanning multispectral radiometer designed specifically for the remote sensing of Ocean Color parameters from an Earth orbiting space platform. A technical manual which is intended for users of NIMBUS 7 CZCS Level 1 data products is presented. It contains information needed by investigators and data processing personnel to operate on the data using digital computers and related equipment.
Okuda, Takahisa; Shiotani, Seiji; Sakamoto, Namiko; Kobayashi, Tomoya
2013-02-10
There is a low autopsy rate and wide distribution of computed tomography (CT) and magnetic resonance imaging (MRI) scanners in Japan. Therefore, many Japanese hospitals, including 36% of the hospitals with in-patient facilities and 89% of large hospitals with ER facilities conduct postmortem imaging (PMI), use clinical scanners to screen for causes in unusual deaths as an alternative to an autopsy or to determine whether an autopsy is needed. The Japanese PMI examination procedure is generally referred to as "autopsy imaging" (Ai) and the term "Ai" is now commonly used by the Japanese government. Currently, 26 of 47 Japanese prefectures have at least one Ai Center with scanners that are dedicated for PMI. Here, we briefly review the history of Japanese PMI (Ai) from 1985 to the present. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
2014-08-15
CAPE CANAVERAL, Fla. – Florida middle school students and their teachers watch the Zero Robotics finals competition broadcast live via webex from the International Space Station. The Florida teams are at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
EML Regional Baseline Station at Chester, NJ, 1987--1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
The Environmental Measurements Laboratory (EML) has maintained a field station at Chester, NJ, since 1976. Located 64 kilometers west of EML, the site is on the property of Bell Communications Research and is a little more than 900 square meters in area. The Chester site is a rural facility which provides us with an opportunity to carry out regional baseline'' research and to test field instruments. In order to meet our special need the technical criteria for such a field station area the following. The site should represent a regional'' pollution condition; that is, no significant local pollution sources shouldmore » be present. The terrain should be relatively flat with minimal rock outcroppings. The soil cover should not have been disturbed for at least 30 years. This report updates the various programs underway at Chester and presents data that have become available since the last report.« less
EML Regional Baseline Station at Chester, NJ, 1987--1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
The Environmental Measurements Laboratory (EML) has maintained a field station at Chester, NJ, since 1976. Located 64 kilometers west of EML, the site is on the property of Bell Communications Research and is a little more than 900 square meters in area. The Chester site is a rural facility which provides us with an opportunity to carry out ``regional baseline`` research and to test field instruments. In order to meet our special need the technical criteria for such a field station area the following. The site should represent a ``regional`` pollution condition; that is, no significant local pollution sources shouldmore » be present. The terrain should be relatively flat with minimal rock outcroppings. The soil cover should not have been disturbed for at least 30 years. This report updates the various programs underway at Chester and presents data that have become available since the last report.« less
Future Automated Rough Mills Hinge on Vision Systems
Philip A. Araman
1996-01-01
The backbone behind major changes to present and future rough mills in dimension, furniture, cabinet or millwork facilities will be computer vision systems. Because of the wide variety of products and the quality of parts produced, the scanning systems and rough mills will vary greatly. The scanners will vary in type. For many complicated applications, multiple scanner...
Document handover of ISS Flight Control room to new Flight Control Room in old MCC
2006-10-06
JSC2006-E-43860 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.
First Experiences with the Trimble SX10 Scanning Total Station for Building Facade Survey
NASA Astrophysics Data System (ADS)
Lachat, E.; Landes, T.; Grussenmeyer, P.
2017-02-01
The use of Terrestrial Laser Scanner (TLS) tends to become a solution in many research areas related to large scale surveying. Meanwhile, the technological advances combined with the investigation of user needs have brought to the design of innovative devices known as scanning total stations. Such instruments merge in a unique hardware both scanning and surveying facilities. Even if their scanning rate is often reduced compared to conventional TLS, they make it possible to directly georeference laser scanning projects and to complete them with measurements of individual points of interest. The recent Trimble SX10 which was launched on the market in early October 2016 has been tested and some experiences carried out with it are reported in this paper. The analyses mainly focus on the survey of a building facade. Next to laser scanning survey, a photogrammetry campaign using an Unmanned Aerial Vehicle (UAV) has been carried out. These different datasets are used to assess the Trimble SX10 issued point clouds through a set of comparisons. Since georeferencing is possible either directly or indirectly using this device, data processed both ways are also compared to conclude about the more reliable method.
Space Launch Complex 6 Wastewater Treatment Facilities Evaluation, Vandenberg AFB, California.
1987-02-01
Sgt Tammy Johnson, AiC Roberto Rolon and AlC Pete Davis without whose valuable assistance this survey could never have been accomplished. We also...lLt Francis E. Slavich, MSgt Horace C. Burbage, Sgt Tammy Johnson, AlCs Roberto Rolon and Pete Davis. The objectives of the survey were to evaluate the...TSK Brooks AFB TX 78235-5301 Defense Technical Information Center (DTIC) 2 Cameron Station Alexandria VA 22319 HQ USAF/LEEV 1 Bolling AFB DC 20330
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
Free-Electron Laser Driven by the NBS (National Bureau of Standards) CW Microtron
1988-03-31
planned over several years. This will begin with the purchase of a 32-bit dual processor system for the yet to be constructed primary station wire scanner ...display subsystem. This 32-bit dual processor system will not only form the wire scanner display system, but has sufficient processing power to...7th hit. Coiif. on FELs, eds., E.T. Scharlemann and D. Prosnitz (North- Holland, Amsterdam, 1986) p. 278. 121 X.K Maruyania and S. Penner, C.M. Tang
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
Closed-ecology life support systems /CELSS/ for long-duration, manned missions
NASA Technical Reports Server (NTRS)
Modell, M.; Spurlock, J. M.
1979-01-01
Studies were conducted to scope the principal areas of technology that can contribute to the development of closed-ecology life support systems (CELSS). Such systems may be required for future space activities, such as space stations, manufacturing facilities, or colonies. A major feature of CELSS is the regeneration of food from carbon in waste materials. Several processes, using biological and/or physico-chemical components, have been postulated for closing the recycle loop. At the present time, limits of available technical information preclude the specification of an optimum scheme. Nevertheless, the most significant technical requirements can be determined by way of an iterative procedure of formulating, evaluating and comparing various closed-system scenario. The functions features and applications of this systems engineering procedure are discussed.
Jafari Roodbandi, Akram Sadat; Naderi, Hamid; Hashenmi-Nejad, Naser; Choobineh, Alireza; Baneshi, Mohammad Reza; Feyzi, Vafa
2017-01-01
Introduction: Three-dimensional (3D) scanners are widely used in medicine. One of the applications of 3D scanners is the acquisition of anthropometric dimensions for ergonomics and the creation of an anthropometry data bank. The aim of this study was to evaluate the precision and accuracy of a modified 3D scanner fabricated in this study. Methods: In this work, a 3D scan of the human body was obtained using DAVID Laser Scanner software and its calibration background, a linear low-power laser, and one advanced webcam. After the 3D scans were imported to the Geomagic software, 10 anthropometric dimensions of 10 subjects were obtained. The measurements of the 3D scanner were compared to the measurements of the same dimensions by a direct anthropometric method. The precision and accuracy of the measurements of the 3D scanner were then evaluated. The obtained data were analyzed using an independent sample t test with the SPSS software. Results: The minimum and maximum measurement differences from three consecutive scans by the 3D scanner were 0.03 mm and 18 mm, respectively. The differences between the measurements by the direct anthropometry method and the 3D scanner were not statistically significant. Therefore, the accuracy of the 3D scanner is acceptable. Conclusion: Future studies will need to focus on the improvement of the scanning speed and the quality of the scanned image.
Jafari Roodbandi, Akram Sadat; Naderi, Hamid; Hashenmi-Nejad, Naser; Choobineh, Alireza; Baneshi, Mohammad Reza; Feyzi, Vafa
2017-01-01
Introduction: Three-dimensional (3D) scanners are widely used in medicine. One of the applications of 3D scanners is the acquisition of anthropometric dimensions for ergonomics and the creation of an anthropometry data bank. The aim of this study was to evaluate the precision and accuracy of a modified 3D scanner fabricated in this study. Methods: In this work, a 3D scan of the human body was obtained using DAVID Laser Scanner software and its calibration background, a linear low-power laser, and one advanced webcam. After the 3D scans were imported to the Geomagic software, 10 anthropometric dimensions of 10 subjects were obtained. The measurements of the 3D scanner were compared to the measurements of the same dimensions by a direct anthropometric method. The precision and accuracy of the measurements of the 3D scanner were then evaluated. The obtained data were analyzed using an independent sample t test with the SPSS software. Results: The minimum and maximum measurement differences from three consecutive scans by the 3D scanner were 0.03 mm and 18 mm, respectively. The differences between the measurements by the direct anthropometry method and the 3D scanner were not statistically significant. Therefore, the accuracy of the 3D scanner is acceptable. Conclusion: Future studies will need to focus on the improvement of the scanning speed and the quality of the scanned image. PMID:28912940
47 CFR 25.151 - Public notice period.
Code of Federal Regulations, 2012 CFR
2012-10-01
... authorizations; (2) The receipt of applications for license or registration of receive-only earth stations; (3... of space station facilities, transmitting earth station facilities, or international receive-only earth station facilities; (6) Significant Commission actions regarding applications; (7) Information...
47 CFR 25.151 - Public notice period.
Code of Federal Regulations, 2011 CFR
2011-10-01
... authorizations; (2) The receipt of applications for license or registration of receive-only earth stations; (3... of space station facilities, transmitting earth station facilities, or international receive-only earth station facilities; (6) Significant Commission actions regarding applications; (7) Information...
47 CFR 25.151 - Public notice period.
Code of Federal Regulations, 2013 CFR
2013-10-01
... authorizations; (2) The receipt of applications for license or registration of receive-only earth stations; (3... of space station facilities, transmitting earth station facilities, or international receive-only earth station facilities; (6) Significant Commission actions regarding applications; (7) Information...
47 CFR 25.151 - Public notice period.
Code of Federal Regulations, 2014 CFR
2014-10-01
... authorizations; (2) The receipt of applications for license or registration of receive-only earth stations; (3... of space station facilities, transmitting earth station facilities, or international receive-only earth station facilities; (6) Significant Commission actions regarding applications; (7) Information...
47 CFR 25.151 - Public notice period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... authorizations; (2) The receipt of applications for license or registration of receive-only earth stations; (3... of space station facilities, transmitting earth station facilities, or international receive-only earth station facilities; (6) Significant Commission actions regarding applications; (7) Information...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedgecock, N.S.
1990-01-01
At the request of 67 Combat Support Group/DEEV the Air Force Occupational and Environmental Health Laboratory conducted a waste-water characterization and hazardous-waste technical assistance survey at Bergstrom AFB (BAFB) from 6-15 Mar 89. The scope of the waste-water survey was to characterize the effluent exiting the base and the effluent from 23 industrial facilities and 10 food-serving facilities. The scope of the hazardous-waste survey was to address hazardous-waste-management practices and explore opportunities for hazardous waste minimization. Specific recommendations from the survey include: (1) Accompany City of Austin personnel during waste-water sampling procedures; (2) Sample at the manhole exiting the mainmore » lift station rather than at the lift station wet well; (3) Split waste-water samples with the City of Austin for comparison of results; (4) Ensure that oil/water separators and grease traps are functioning properly and are cleaned out regularly; (5) Limit the quantity of soaps and solvents discharged down the drain to the sanitary sewer; (6) Establish a waste disposal contract for the removal of wastes in the Petroleum Oils and Lubricants underground storage tanks. (7) Remove, analyze, and properly dispose of oil contaminated soil from accumulation sites. (8) Move indoors or secure, cover, and berm the aluminum sign reconditioning tank at 67 Civil Engineering Squadron Protective Coating. (9) Connect 67 Combat Repair Squadron Test Cell floor drains to the sanitary sewer.« less
The TT-PET project: a thin TOF-PET scanner based on fast novel silicon pixel detectors
NASA Astrophysics Data System (ADS)
Bandi, Y.; Benoit, M.; Cadoux, F. R.; Forshaw, D. C.; Hänni, R.; Hayakawa, D.; Iacobucci, G.; Michal, S.; Miucci, A.; Paolozzi, L.; Ratib, O.; Ripiccini, E.; Tognina, C.; Valerio, P.; Weber, M.
2018-01-01
The TT-PET project aims at developing a compact Time-of-flight PET scanner with 30ps time resolution, capable of withstanding high magnetic fields and allowing for integration in a traditional MRI scanner, providing complimentary real-time PET images. The very high timing resolution of the TT-PET scanner is achieved thanks to a new generation of Silicon-Germanium (Si-Ge) amplifiers, which are embedded in monolithic pixel sensors. The scanner is composed of 16 detection towers as well as cooling blocks, arranged in a ring structure. The towers are composed of multiple ultra-thin pixel modules stacked on top of each other. Making it possible to perform depth of interaction measurements and maximize the spatial resolution along the line of flight of the two photons emitted within a patient. This will result in improved image quality, contrast, and uniformity while drastically reducing backgrounds within the scanner. Allowing for a reduction in the amount of radioactivity delivered to the patient. Due to an expected data rate of about 250 MB/s a custom readout system for high data throughput has been developed, which includes noise filtering and reduced data pressure. The realisation of a first scanner prototype for small animals is foreseen by 2019. A general overview of the scanner will be given including, technical details concerning the detection elements, mechanics, DAQ readout, simulation and results.
Future large broadband switched satellite communications networks
NASA Technical Reports Server (NTRS)
Staelin, D. H.; Harvey, R. R.
1979-01-01
Critical technical, market, and policy issues relevant to future large broadband switched satellite networks are summarized. Our market projections for the period 1980 to 2000 are compared. Clusters of switched satellites, in lieu of large platforms, etc., are shown to have significant advantages. Analysis of an optimum terrestrial network architecture suggests the proper densities of ground stations and that link reliabilities 99.99% may entail less than a 10% cost premium for diversity protection at 20/30 GHz. These analyses suggest that system costs increase as the 0.6 power of traffic. Cost estimates for nominal 20/30 GHz satellite and ground facilities suggest optimum system configurations might employ satellites with 285 beams, multiple TDMA bands each carrying 256 Mbps, and 16 ft ground station antennas. A nominal development program is outlined.
Document handover of ISS Flight Control room to new Flight Control Room in old MCC
2006-10-06
JSC2006-E-43863 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. This view is toward the rear of the "new" room. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.
Proton radiography and tomography with application to proton therapy
Allinson, N M; Evans, P M
2015-01-01
Proton radiography and tomography have long promised benefit for proton therapy. Their first suggestion was in the early 1960s and the first published proton radiographs and CT images appeared in the late 1960s and 1970s, respectively. More than just providing anatomical images, proton transmission imaging provides the potential for the more accurate estimation of stopping-power ratio inside a patient and hence improved treatment planning and verification. With the recent explosion in growth of clinical proton therapy facilities, the time is perhaps ripe for the imaging modality to come to the fore. Yet many technical challenges remain to be solved before proton CT scanners become commonplace in the clinic. Research and development in this field is currently more active than at any time with several prototype designs emerging. This review introduces the principles of proton radiography and tomography, their historical developments, the raft of modern prototype systems and the primary design issues. PMID:26043157
Wollenweber, Scott D; Kemp, Brad J
2016-11-01
This investigation aimed to develop a scanner quantification performance methodology and compare multiple metrics between two scanners under different imaging conditions. Most PET scanners are designed to work over a wide dynamic range of patient imaging conditions. Clinical constraints, however, often impact the realization of the entitlement performance for a particular scanner design. Using less injected dose and imaging for a shorter time are often key considerations, all while maintaining "acceptable" image quality and quantitative capability. A dual phantom measurement including resolution inserts was used to measure the effects of in-plane (x, y) and axial (z) system resolution between two PET/CT systems with different block detector crystal dimensions. One of the scanners had significantly thinner slices. Several quantitative measures, including feature contrast recovery, max/min value, and feature profile accuracy were derived from the resulting data and compared between the two scanners and multiple phantoms and alignments. At the clinically relevant count levels used, the scanner with thinner slices had improved performance of approximately 2%, averaged over phantom alignments, measures, and reconstruction methods, for the head-sized phantom, mainly demonstrated with the rods aligned perpendicular to the scanner axis. That same scanner had a slightly decreased performance of -1% for the larger body-size phantom, mostly due to an apparent noise increase in the images. Most of the differences in the metrics between the two scanners were less than 10%. Using the proposed scanner performance methodology, it was shown that smaller detector elements and a larger number of image voxels require higher count density in order to demonstrate improved image quality and quantitation. In a body imaging scenario under typical clinical conditions, the potential advantages of the design must overcome increases in noise due to lower count density.
Schaap, Kristel; Christopher-de Vries, Yvette; Mason, Catherine K; de Vocht, Frank; Portengen, Lützen; Kromhout, Hans
2014-01-01
Objectives Limited data is available about incidence of acute transient symptoms associated with occupational exposure to static magnetic stray fields from MRI scanners. We aimed to assess the incidence of these symptoms among healthcare and research staff working with MRI scanners, and their association with static magnetic field exposure. Methods We performed an observational study among 361 employees of 14 clinical and research MRI facilities in The Netherlands. Each participant completed a diary during one or more work shifts inside and/or outside the MRI facility, reporting work activities and symptoms (from a list of potentially MRI-related symptoms, complemented with unrelated symptoms) experienced during a working day. We analysed 633 diaries. Exposure categories were defined by strength and type of MRI scanner, using non-MRI shifts as the reference category for statistical analysis. Non-MRI shifts originated from MRI staff who also participated on MRI days, as well as CT radiographers who never worked with MRI. Results Varying per exposure category, symptoms were reported during 16–39% of the MRI work shifts. We observed a positive association between scanner strength and reported symptoms among healthcare and research staff working with closed-bore MRI scanners of 1.5 Tesla (T) and higher (1.5 T OR=1.88; 3.0 T OR=2.14; 7.0 T OR=4.17). This finding was mainly driven by reporting of vertigo and metallic taste. Conclusions The results suggest an exposure-response association between exposure to strong static magnetic fields (and associated motion-induced time-varying magnetic fields) and reporting of transient symptoms on the same day of exposure. Trial registration number 11-032/C PMID:24714654
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looney, Brian B.; Jackson, Dennis G.; Truex, Michael J.
TEPCO is implementing a number of water countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of protection. In general, the strategy represents a comprehensive example of a “defense in depth” concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area and provide TEPCO the ability to reduce the amountmore » of contaminated water that requires treatment and storage. The National Laboratory team supports the selection of artificial ground freezing and the incorporation of the frozen soil barrier in the contaminated water countermeasures -- the technical characteristics of a frozen barrier are relatively well suited to the Fukushima-specific conditions and the need for inflow reduction. Further, our independent review generally supports the TEPCO/Kajima design, installation strategy and operation plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sisterson, D. L.
2015-10-01
The Atmospheric Radiation Measurement (ARM) Program was created in 1989 with funding from the U.S. Department of Energy (DOE) to develop several highly instrumented ground stations to study cloud formation processes and their influence on radiative transfer. In 2003, the ARM Program became a national scientific user facility, known as the ARM Climate Research Facility. This scientific infrastructure provides for fixed sites, mobile facilities, an aerial facility, and a data archive available for use by scientists worldwide through the ARM Climate Research Facility—a scientific user facility. The ARM Climate Research Facility currently operates more than 300 instrument systems that providemore » ground-based observations of the atmospheric column. To keep ARM at the forefront of climate observations, the ARM infrastructure depends heavily on instrument scientists and engineers, also known as lead mentors. Lead mentors must have an excellent understanding of in situ and remote-sensing instrumentation theory and operation and have comprehensive knowledge of critical scale-dependent atmospheric processes. They must also possess the technical and analytical skills to develop new data retrievals that provide innovative approaches for creating research-quality data sets. The ARM Climate Research Facility is seeking the best overall qualified candidate who can fulfill lead mentor requirements in a timely manner.« less
How does PET/MR work? Basic physics for physicians.
Delso, Gaspar; Ter Voert, Edwin; Veit-Haibach, Patrick
2015-08-01
The aim of this article is to provide Radiologists and Nuclear Medicine physicians the basic information required to understand how PET/MR scanners work, what are their limitations and how to evaluate their performance. It will cover the operational principles of standalone PET and MR imaging, as well as the technical challenges of creating a hybrid system and how they have been solved in the now commercially available scanners. Guidelines will be provided to interpret the main performance figures of hybrid PET/MR systems.
Nimbus 7 Coastal Zone Color Scanner (CZCS). Level 2 data product users' guide
NASA Technical Reports Server (NTRS)
Williams, S. P.; Szajna, E. F.; Hovis, W. A.
1985-01-01
The coastal zone color scanner (CZCS) is a scanning multispectral radiometer designed for the remote sensing of ocean color parameters from an earth orbiting space platform. A Technical Manual was designed for users of NIMBUS 7 CZCS Level 2 data products. It contains information which describes how the Level 1 data was process to obtain the Level 2 (derived) product. It contains information needed to operate on the data using digital computers and related equipment.
Space station environmental control and life support systems test bed program - an overview
NASA Astrophysics Data System (ADS)
Behrend, Albert F.
As the National Aeronautics and Space Administration (NASA) begins to intensify activities for development of the Space Station, decisions must be made concerning the technical state of the art that will be baselined for the initial Space Station system. These decisions are important because significant potential exists for enhancing system performance and for reducing life-cycle costs. However, intelligent decisions cannot be made without an adequate assessment of new and ready technologies, i.e., technologies which are sufficiently mature to allow predevelopment demonstrations to prove their application feasibility and to quantify the risk associated with their development. Therefore, the NASA has implemented a technology development program which includes the establishment of generic test bed capabilities in which these new technologies and approaches can be tested at the prototype level. One major Space Station subsystem discipline in which this program has been implemented is the environmental control and life support system (ECLSS). Previous manned space programs such as Gemini, Apollo, and Space Shuttle have relied heavily on consumables to provide environmental control and life support services. However, with the advent of a long-duration Space Station, consumables must be reduced within technological limits to minimize Space Station resupply penalties and operational costs. The use of advanced environmental control and life support approaches involving regenerative processes offers the best solution for significant consumables reduction while also providing system evolutionary growth capability. Consequently, the demonstration of these "new technologies" as viable options for inclusion in the baseline that will be available to support a Space Station initial operational capability in the early 1990's becomes of paramount importance. The mechanism by which the maturity of these new regenerative life support technologies will be demonstrated is the Space Station ECLSS Test Bed Program. The Space Station ECLSS Test Bed Program, which is managed by the NASA, is designed to parallel and to provide continuing support to the Space Station Program. The prime objective of this multiphase test bed program is to provide viable, mature, and enhancing technical options in time for Space Station implementation. To accomplish this objective, NASA is actively continuing the development and testing of critical components and engineering preprototype subsystems for urine processing, washwater recovery, water quality monitoring, carbon dioxide removal and reduction, and oxygen generation. As part of the ECLSS Test Bed Program, these regenerative subsystems and critical components are tested in a development laboratory to characterize subsystem performance and to identify areas in which further technical development is required. Proven concepts are then selected for development into prototype subsystems in which flight issues such as packaging and maintenance are addressed. These subsystems then are to be assembled as an integrated system and installed in an integrated systems test bed facility for extensive unmanned and manned testing.
NASA Technical Reports Server (NTRS)
1997-01-01
Session WA3 includes short reports concerning: (1) Physiolab A Cardio Vascular Laboratory; (2) MEDEX: A Flexible Modular Physiological Laboratory; (3) A Sensate Liner for Personnel Monitoring Applications; (4) Secure Remote Access to Physiological Data; (5) DARA Vestibular Equipment Onboard MIR; (6) The Kinelite Project: A New powerful Motion Analysis System for Spacelab Mission; (7) The Technical Evolution of the French Neurosciences Multipurpose Instruments Onboard the MIR Station; (8) Extended Ground-Based Research in Preparation for Life Sciences Experiments; and (9) MEDES Clinical Research Facility as a Tool to Prepare ISSA Space Flights.
Bidirectional power converter control electronics
NASA Technical Reports Server (NTRS)
Mildice, J. W.
1987-01-01
The object of this program was to design, build, test, and deliver a set of control electronics suitable for control of bidirectional resonant power processing equipment of the direct output type. The program is described, including the technical background, and results discussed. Even though the initial program tested only the logic outputs, the hardware was subsequently tested with high-power breadboard equipment, and in the testbed of NASA contract NAS3-24399. The completed equipment is now operating as part of the Space Station Power System Test Facility at NASA Lewis Research Center.
47 CFR 73.24 - Broadcast facilities; showing required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... RADIO BROADCAST SERVICES AM Broadcast Stations § 73.24 Broadcast facilities; showing required. An authorization for a new AM broadcast station or increase in facilities of an existing station will be issued... among the several states and communities. (b) That a proposed new station (or a proposed change in the...
Methods for CT automatic exposure control protocol translation between scanner platforms.
McKenney, Sarah E; Seibert, J Anthony; Lamba, Ramit; Boone, John M
2014-03-01
An imaging facility with a diverse fleet of CT scanners faces considerable challenges when propagating CT protocols with consistent image quality and patient dose across scanner makes and models. Although some protocol parameters can comfortably remain constant among scanners (eg, tube voltage, gantry rotation time), the automatic exposure control (AEC) parameter, which selects the overall mA level during tube current modulation, is difficult to match among scanners, especially from different CT manufacturers. Objective methods for converting tube current modulation protocols among CT scanners were developed. Three CT scanners were investigated, a GE LightSpeed 16 scanner, a GE VCT scanner, and a Siemens Definition AS+ scanner. Translation of the AEC parameters such as noise index and quality reference mAs across CT scanners was specifically investigated. A variable-diameter poly(methyl methacrylate) phantom was imaged on the 3 scanners using a range of AEC parameters for each scanner. The phantom consisted of 5 cylindrical sections with diameters of 13, 16, 20, 25, and 32 cm. The protocol translation scheme was based on matching either the volumetric CT dose index or image noise (in Hounsfield units) between two different CT scanners. A series of analytic fit functions, corresponding to different patient sizes (phantom diameters), were developed from the measured CT data. These functions relate the AEC metric of the reference scanner, the GE LightSpeed 16 in this case, to the AEC metric of a secondary scanner. When translating protocols between different models of CT scanners (from the GE LightSpeed 16 reference scanner to the GE VCT system), the translation functions were linear. However, a power-law function was necessary to convert the AEC functions of the GE LightSpeed 16 reference scanner to the Siemens Definition AS+ secondary scanner, because of differences in the AEC functionality designed by these two companies. Protocol translation on the basis of quantitative metrics (volumetric CT dose index or measured image noise) is feasible. Protocol translation has a dependency on patient size, especially between the GE and Siemens systems. Translation schemes that preserve dose levels may not produce identical image quality. Copyright © 2014 American College of Radiology. Published by Elsevier Inc. All rights reserved.
Electrocardiogram Scanner-System Requirements
DOT National Transportation Integrated Search
1973-03-01
An experimental and analytical study has been conducted to establish the feasibility for scanning and digitizing electrocardiogram records. The technical requirements and relative costs for two systems are discussed herein. One is designed to automat...
2008-08-19
S73-34295A (June 1973) --- A vertical view of a portion of northern California reproduced from data taken from the Skylab Multispectral Scanner, experiment S192, in the Skylab space station in Earth orbit. This view is the most westerly one-third of Frame No. 001, Roll No. 518, S192, Skylab 2. Frame No. 001 extends from the Pacific coast at the Eureka area southeasterly 175 nautical miles to the Feather River drainage basin. Included in this view are Sacramento River Valley, Oroville Reservoir, Oroville and Chico. This non-photographic image is a color composite of channels 2 (visible), 7 and 12 (infrared) from the Earth Resources Experiments Package (EREP) S192 scanner. The scanner techniques assist with spectral signature identification and mapping of ground truth targets in agriculture, forestry, geology, hydrology and oceanography. Photo credit: NASA
Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less
Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less
47 CFR 73.24 - Broadcast facilities; showing required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Broadcast facilities; showing required. 73.24... RADIO BROADCAST SERVICES AM Broadcast Stations § 73.24 Broadcast facilities; showing required. An authorization for a new AM broadcast station or increase in facilities of an existing station will be issued...
ERIC Educational Resources Information Center
Lane Community Coll., Eugene, OR.
This third-year course for electrical power station wirer apprentices is a foundation for the study of all aspects of installation and maintenance of power station equipment. It also provides a good technical background as well as the general knowledge essential to power station operator trainees. The course is intended to be equivalent to a…
Convective transport in ATM simulations and its relation to the atmospheric stability conditions
NASA Astrophysics Data System (ADS)
Kusmierczyk-Michulec, Jolanta
2017-04-01
The International Monitoring System (IMS) developed by the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) is a global system of monitoring stations, using four complementary technologies: seismic, hydroacoustic, infrasound and radionuclide. Data from all stations, belonging to IMS, are collected and transmitted to the International Data Centre (IDC) in Vienna, Austria. The radionuclide network comprises 80 stations, of which more than 60 are certified. The aim of radionuclide stations is a global monitoring of radioactive aerosols and radioactive noble gases, in particular xenon isotopes, supported by the atmospheric transport modeling (ATM). One of the important noble gases, monitored on a daily basis, is radioxenon. It can be produced either during a nuclear explosion with a high fission yield, and thus be considered as an important tracer to prove the nuclear character of an explosion, or be emitted from nuclear power plants (NPPs) or from isotope production facilities (IPFs). To investigate the transport of xenon emissions, the Provisional Technical Secretariat (PTS) operates an Atmospheric Transport Modelling (ATM) system based on the Lagrangian Particle Dispersion Model FLEXPART. To address the question whether including the convective transport in ATM simulations will change the results significantly, the differences between the outputs with the convective transport turned off and turned on, were computed and further investigated taking into account the atmospheric stability conditions. For that purpose series of 14 days forward simulations, with convective transport and without it, released daily in the period January 2011 to February 2012, were analysed. The release point was at the ANSTO facility in Australia. The unique opportunity of having access to both daily emission values for ANSTO as well as measured Xe-133 activity concentration (AC) values at the IMS stations, gave a chance to validate the simulations.
MEDES clinical research facility as a tool to prepare ISSA space flights
NASA Astrophysics Data System (ADS)
Maillet, A.; Traon, A. Pavy-Le
This new multi-disciplinary medical experimentation center provides the ideal scientific, medical and technical environment required for research programs and to prepare international space station Alpha (ISSA) missions, where space and healthcare industries can share their expertise. Different models are available to simulate space flight effects (bed-rest, confinement,…). This is of particular interest for research in Human psychology, physiology, physiopathology and ergonomics, validation of biomedical materials and procedures, testing of drugs, and other healthcare related products. This clinical research facility (CRF) provides valuable services in various fields of Human research requiring healthy volunteers. CRF is widely accessible to national and international, scientific, medical and industrial organisations. Furthermore, users have at their disposal the multi-disciplinary skills of MEDES staff and all MEDES partners on a single site.
NASA Technical Reports Server (NTRS)
Cushman, Paula P.
1993-01-01
Research will be undertaken in this contract in the area of Modeling Resource and Facilities Enhancement to include computer, technical and educational support to NASA investigators to facilitate model implementation, execution and analysis of output; to provide facilities linking USRA and the NASA/EADS Computer System as well as resident work stations in ESAD; and to provide a centralized location for documentation, archival and dissemination of modeling information pertaining to NASA's program. Additional research will be undertaken in the area of Numerical Model Scale Interaction/Convective Parameterization Studies to include implementation of the comparison of cloud and rain systems and convective-scale processes between the model simulations and what was observed; and to incorporate the findings of these and related research findings in at least two refereed journal articles.
NASA Astrophysics Data System (ADS)
Montebugnoli, S.; Pupillo, G.; Salerno, E.; Pluchino, S.; di Martino, M.
2010-03-01
An accurate measurement of the position and trajectory of the space debris fragments is of primary importance for the characterization of the orbital debris environment. The Medicina Radioastronomical Station is a radio observation facility that is here proposed as receiving part of a ground-based space surveillance system for detecting and tracking space debris at different orbital regions (from Low Earth Orbits up to Geostationary Earth Orbits). The proposed system consists of two bistatic radars formed by the existing Medicina receiving antennas coupled with appropriate transmitters. This paper focuses on the current features and future technical development of the receiving part of the observational setup. Outlines of possible transmitting systems will also be given together with the evaluation of the observation strategies achievable with the proposed facilities.
ACHP | Historic Preservation in Technical or Scientific Facilities
with the Operation of Highly Technical or Scientific Facilities Balancing Historic Preservation Needs with the Operation of Highly Technical or Scientific Facilities 1991; 79 pages; excerpt available Needs with the Operation of Highly Technical or Scientific Facilities considers the appropriate role of
Cai, Yinqiao; Tong, Xiaohua; Tong, Peng; Bu, Hongyi; Shu, Rong
2010-12-01
As an active remote sensor technology, the terrestrial laser scanner is widely used for direct generation of a three-dimensional (3D) image of an object in the fields of geodesy, surveying, and photogrammetry. In this article, a new laser scanner using array avalanche photodiodes, as designed by the Shanghai Institute of Technical Physics of the Chinese Academy of Sciences, is introduced for rapid collection of 3D data. The system structure of the new laser scanner is first presented, and a mathematical model is further derived to transform the original data to the 3D coordinates of the object in a user-defined coordinate system. The performance of the new laser scanner is tested through a comprehensive experiment. The result shows that the new laser scanner can scan a scene with a field view of 30° × 30° in 0.2 s and that, with respect to the point clouds obtained on the wall and ground floor surfaces, the root mean square errors for fitting the two planes are 0.21 and 0.01 cm, respectively. The primary advantages of the developed laser scanner include: (i) with a line scanning mode, the new scanner achieves simultaneously the 3D coordinates of 24 points per single laser pulse, which enables it to scan faster than traditional scanners with a point scanning mode and (ii) the new scanner makes use of two galvanometric mirrors to deflect the laser beam in both the horizontal and the vertical directions. This capability makes the instrument smaller and lighter, which is more acceptable for users.
47 CFR 80.659 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements. 80.659 Section 80.659 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Maritime Support Stations § 80.659 Technical requirements. The authorized frequency...
IMS Seismic and Infrasound Stations Instrumental Challenges
NASA Astrophysics Data System (ADS)
Starovoit, Y. O.; Dricker, I. G.; Marty, J.
2016-12-01
The IMS seismic network is a set of monitoring facilities including 50 primary stations and 120 auxiliary stations. Besides the difference in the mode of data transmission to the IDC, technical specifications for seismographic equipment to be installed at both types of stations are essentially the same. The IMS infrasound network comprises 60 facilities with the requirement of continuous data transmission to IDC. The objective of this presentation is to report instrumental challenges associated with both seismic and infrasound technologies. In context of specifications for IMS seismic stations it was stressed that verification seismology is concerned with searching of reliable methods of signal detections at high frequencies. In the meantime MS/mb screening criteria between earthquakes and explosions relies on reliable detection of surface waves. The IMS seismic requirements for instrumental noise and operational range of data logger are defined as certain dB level below minimum background within the required frequency band from 0.02 to 16Hz. The type of sensors response is requested to be flat either in velocity or acceleration. The compliance with IMS specifications may thus introduce a challenging task when low-noise conditions have been recorded at the site. It means that as a station noise PSD approaches the NLNM it requires a high sensitive sensor to be connected to a quiet digitizer which may cause a quick system clip and waste of the available dynamic range. The experience has shown that hybrid frequency response of seismic sensors where combination of flat to velocity and flat to acceleration portions of the sensor frequency response may provide an optimal solution for utilization of the dynamic range and low digitizer noise floor. Vast efforts are also being undertaken and results achieved in the infrasound technology to standardize and optimize the response of the Wind-Noise Reduction System within the IMS infrasound passband from 0.02-4Hz and to deploy calibration equipment in compliance with IMS requirements. In addition to the above IMS stations need to meet specific requirements such as data authentication, central facility data buffering, precise relative timing accuracy between data samples coming from array elements as well as more than 97% of data with less than 5 min delay when transmitted to IDC.
2014-08-15
CAPE CANAVERAL, Fla. – Kennedy Space Center Director and former astronaut Bob Cabana, talks to Florida middle school students and their teachers during the Zero Robotics finals competition at the center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Kennedy Space Center Director and former astronaut Bob Cabana, talks to Florida middle school students and their teachers during the Zero Robotics finals competition at the center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Kennedy Space Center Director and former astronaut Bob Cabana, talks to Florida middle school students and their teachers during the Zero Robotics finals competition at the center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
Client/server approach to image capturing
NASA Astrophysics Data System (ADS)
Tuijn, Chris; Stokes, Earle
1998-01-01
The diversity of the digital image capturing devices on the market today is quite astonishing and ranges from low-cost CCD scanners to digital cameras (for both action and stand-still scenes), mid-end CCD scanners for desktop publishing and pre- press applications and high-end CCD flatbed scanners and drum- scanners with photo multiplier technology. Each device and market segment has its own specific needs which explains the diversity of the associated scanner applications. What all those applications have in common is the need to communicate with a particular device to import the digital images; after the import, additional image processing might be needed as well as color management operations. Although the specific requirements for all of these applications might differ considerably, a number of image capturing and color management facilities as well as other services are needed which can be shared. In this paper, we propose a client/server architecture for scanning and image editing applications which can be used as a common component for all these applications. One of the principal components of the scan server is the input capturing module. The specification of the input jobs is based on a generic input device model. Through this model we make abstraction of the specific scanner parameters and define the scan job definitions by a number of absolute parameters. As a result, scan job definitions will be less dependent on a particular scanner and have a more universal meaning. In this context, we also elaborate on the interaction of the generic parameters and the color characterization (i.e., the ICC profile). Other topics that are covered are the scheduling and parallel processing capabilities of the server, the image processing facilities, the interaction with the ICC engine, the communication facilities (both in-memory and over the network) and the different client architectures (stand-alone applications, TWAIN servers, plug-ins, OLE or Apple-event driven applications). This paper is structured as follows. In the introduction, we further motive the need for a scan server-based architecture. In the second section, we give a brief architectural overview of the scan server and the other components it is connected to. The third chapter exposes the generic model for input devices as well as the image processing model; the fourth chapter reveals the different shapes the scanning applications (or modules) can have. In the last section, we briefly summarize the presented material and point out trends for future development.
Engineering directorate technical facilities catalog
NASA Technical Reports Server (NTRS)
Maloy, Joseph E.
1993-01-01
The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).
1973-09-20
S73-34295 (June 1973) --- A vertical view of a portion of northern California reproduced from data taken from the Skylab Multispectral Scanner, experiment S192, in the Skylab space station in Earth orbit. This view is the most westerly one-third of Frame No. 001, Roll No. 518, S192, Skylab 2. Frame No. 001 extends from the Pacific coast at the Eureka area southeasterly 175 nautical miles to the Feather River drainage basin. Included in this view are Eureka, Trinidad, Klamath & Trinity Rivers and the Coastal Range mountains. This non-photographic image is a color composite of channels 2 (visible), 7, and 12 (infrared) from the Earth Resources Experiments Package (EREP) S192 scanner. The scanner techniques assist with spectral signature identification and mapping of ground truth targets in agriculture, forestry, geology, hydrology and oceanography. Photo credit: NASA
NASA Astrophysics Data System (ADS)
Gumilar, Irwan; Fattah, Alif; Abidin, Hasanuddin Z.; Sadarviana, Vera; Putri, Nabila S. E.; Kristianto
2017-07-01
West Java is one of the provinces in Indonesia which is prone to landslide. Over the past few years, landslides in this area have resulted in a large number of victims. One of the areas in West Java with the highest risk of landslide occurrence is Rancabali Ciwidey. In general, the morphology around the landslide location is steep hills, with the slope > 30° and the altitude between 1550 - 1865 m above sea level. Several indications of ground movements can be seen in the form of slumps and cracks on the village roads and tea plantation, as well as slanting trees and electricity poles. The ground movement monitoring in this area is necessary for disaster mitigation. Several methods that can be used to monitor the landslide are using Terrestrial Laser Scanner (TLS) and robotic total station. This research aims is monitoring the landslide using these methods. The methodology used in this research is by obtaining the scanning data using TLS C-10 and Robotic total station MS05 measurements to obtain the coordinates of monitoring point clouds and prism. The TLS software that we used are Cyclone 8.1 and Maptek I-Site. For robotic total station, the software that we used is MSP software. These method hopefully can be used for early warning system of landslide in Rancabali area.
Characterizing the Performance of the Princeton Advanced Test Stand Ion Source
NASA Astrophysics Data System (ADS)
Stepanov, A.; Gilson, E. P.; Grisham, L.; Kaganovich, I.; Davidson, R. C.
2012-10-01
The Princeton Advanced Test Stand (PATS) is a compact experimental facility for studying the physics of intense beam-plasma interactions relevant to the Neutralized Drift Compression Experiment - II (NDCX-II). The PATS facility consists of a multicusp RF ion source mounted on a 2 m-long vacuum chamber with numerous ports for diagnostic access. Ar+ beams are extracted from the source plasma with three-electrode (accel-decel) extraction optics. The RF power and extraction voltage (30 - 100 kV) are pulsed to produce 100 μsec duration beams at 0.5 Hz with excellent shot-to-shot repeatability. Diagnostics include Faraday cups, a double-slit emittance scanner, and scintillator imaging. This work reports measurements of beam parameters for a range of beam energies (30 - 50 keV) and currents to characterize the behavior of the ion source and extraction optics. Emittance scanner data is used to calculate the beam trace-space distribution and corresponding transverse emittance. If the plasma density is changing during a beam pulse, time-resolved emittance scanner data has been taken to study the corresponding evolution of the beam trace-space distribution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, Peter M.; Schultz-Fellenz, Emily S.; Kelley, Richard E.
This technical paper presents the most recent and updated catalog of earthquakes measured by the Los Alamos Seismic Network at and around Los Alamos National Laboratory (LANL), with specific focus on the site of the proposed transuranic waste facility (TWF) at Technical Area 63 (TA-63). Any questions about the data presented herein, or about the Los Alamos Seismic Network, should be directed to the authors of this technical paper. LANL and the Los Alamos townsite sit atop the Pajarito Plateau, which is bounded on its western edge by the Pajarito fault system, a 35-mile-long system locally comprised of the down-to-the-eastmore » Pajarito fault (the master fault) and subsidiary down-to-the-west Rendija Canyon, Guaje Mountain, and Sawyer Canyon faults (Figure 1). This fault system forms the local active western margin of the Rio Grande rift near Los Alamos, and is potentially seismogenic (e.g., Gardner et al., 2001; Reneau et al., 2002; Lewis et al., 2009). The proposed TWF area at TA-63 is situated on an unnamed mesa in the north-central part of LANL between Twomile Canyon to the south, Ten Site Canyon to the north, and the headwaters of Canada del Buey to the east (Figure 2). The local bedrock is the Quaternary Bandelier Tuff, formed in two eruptive pulses from nearby Valles caldera, the eastern edge of which is located approximately 6.5 miles west-northwest of the technical area. The older member (Otowi Member) of the Bandelier Tuff has been dated at 1.61 Ma (Izett and Obradovich 1994). The younger member (Tshirege Member) of the Bandelier Tuff has been dated at 1.256 Ma (age from Phillips et al. 2007) and is widely exposed as the mesa-forming unit around Los Alamos. Several discrete cooling units comprise the Tshirege Member. Commonly accepted stratigraphic nomenclature for the Tshirege Member is described in detail by Broxton and Reneau (1995), Gardner et al. (2001), and Lewis et al. (2009). The Tshirege Member cooling unit exposed at the surface at TA-63 is Qbt3. Understanding the subtle differences between Tshirege Member cooling units and the nature of the contacts between cooling units is critical to identifying the presence or absence of faults associated with the Pajarito fault system on the Pajarito Plateau. The Los Alamos Seismic Network (LASN) continuously monitors local earthquake activity in the Los Alamos area in support of LANL's Seismic Hazards program. Seismic monitoring of LANL facilities is a requirement of DOE Order 420.1B (Facility Safety). LASN currently consists of nine permanent seismic instrument field stations that telemeter real-time sensitive ground motion data to a central recording facility. Four of these stations are located on LANL property, with three of those within 2.5 miles of TA-63. The other five stations are in remote locations in the Jemez Mountains, Valles Caldera, St Peters Dome, and the Caja del Rio plateau across the Rio Grande from the Los Alamos area. Local earthquakes are defined as those with locations within roughly 100 miles of Los Alamos. Plate 1 shows the current LASN station locations and all local earthquakes recorded from 1973 through 2011. During this time period, LASN has detected and recorded over 850 local earthquakes in north-central New Mexico. Over 650 of these were located within about 50 miles of Los Alamos, and roughly 60 were within 10 miles. The apparent higher density of earthquakes close to Los Alamos, relative to the rest of north-central New Mexico, is due largely to the fact that LASN is a sensitive local seismic network, recording many very small nearby events (magnitude less than 1.0) that are undetectable at greater distances.« less
The Beatles, the Nobel Prize, and CT scanning of the chest.
Goodman, Lawrence R
2010-01-01
From its first test scan on a mouse, in 1967, to current medical practice, the CT scanner has become a core imaging tool in thoracic diagnosis. Initially financed by money from Beatles' record sales, the first patient scan was performed in 1971. Only 8 years later, a Nobel Prize in Physics and Medicine was awarded to Hounsfield and Cormack for their discovery. This article traces the history of CT scanner development and how each technical advance expanded chest diagnostic frontiers. Chest imaging now accounts for 30% of all CT scanning.
Grid-Scale Energy Storage Demonstration of Ancillary Services Using the UltraBattery Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seasholtz, Jeff
2015-08-20
The collaboration described in this document is being done as part of a cooperative research agreement under the Department of Energy’s Smart Grid Demonstration Program. This document represents the Final Technical Performance Report, from July 2012 through April 2015, for the East Penn Manufacturing Smart Grid Program demonstration project. This Smart Grid Demonstration project demonstrates Distributed Energy Storage for Grid Support, in particular the economic and technical viability of a grid-scale, advanced energy storage system using UltraBattery ® technology for frequency regulation ancillary services and demand management services. This project entailed the construction of a dedicated facility on the Eastmore » Penn campus in Lyon Station, PA that is being used as a working demonstration to provide regulation ancillary services to PJM and demand management services to Metropolitan Edison (Met-Ed).« less
36 CFR 1254.80 - Does NARA allow me to use scanners or other personal copying equipment?
Code of Federal Regulations, 2012 CFR
2012-07-01
...). The supervisor administering the research room or the senior staff member on duty in the research room reviews the research room attendant's determination if you request. (b) Equipment platens or copy boards... archives or Presidential library, contact the facility first for approval. Not all facilities permit the...
36 CFR 1254.80 - Does NARA allow me to use scanners or other personal copying equipment?
Code of Federal Regulations, 2011 CFR
2011-07-01
...). The supervisor administering the research room or the senior staff member on duty in the research room reviews the research room attendant's determination if you request. (b) Equipment platens or copy boards... archives or Presidential library, contact the facility first for approval. Not all facilities permit the...
36 CFR 1254.80 - Does NARA allow me to use scanners or other personal copying equipment?
Code of Federal Regulations, 2014 CFR
2014-07-01
...). The supervisor administering the research room or the senior staff member on duty in the research room reviews the research room attendant's determination if you request. (b) Equipment platens or copy boards... archives or Presidential library, contact the facility first for approval. Not all facilities permit the...
47 CFR 22.715 - Technical channel assignment criteria for rural radiotelephone stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical channel assignment criteria for rural radiotelephone stations. 22.715 Section 22.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Rural Radiotelephone Service § 22.715 Technical channel...
47 CFR 22.715 - Technical channel assignment criteria for rural radiotelephone stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical channel assignment criteria for rural radiotelephone stations. 22.715 Section 22.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Rural Radiotelephone Service § 22.715 Technical channel...
47 CFR 22.715 - Technical channel assignment criteria for rural radiotelephone stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical channel assignment criteria for rural radiotelephone stations. 22.715 Section 22.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Rural Radiotelephone Service § 22.715 Technical channel...
47 CFR 22.715 - Technical channel assignment criteria for rural radiotelephone stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical channel assignment criteria for rural radiotelephone stations. 22.715 Section 22.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Rural Radiotelephone Service § 22.715 Technical channel...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schanfein, Mark J.; Mladineo, Stephen V.
2015-07-07
Over the last few years, significant attention has been paid to both encourage application and provide domestic and international guidance for designing in safeguards and security in new facilities.1,2,3 However, once a facility is operational, safeguards, security, and safety often operate as separate entities that support facility operations. This separation is potentially a serious weakness should insider or outsider threats become a reality.Situations may arise where safeguards detects a possible loss of material in a facility. Will they notify security so they can, for example, check perimeter doors for tampering? Not doing so might give the advantage to an insidermore » who has already, or is about to, move nuclear material outside the facility building. If outsiders break into a facility, the availability of any information to coordinate the facility’s response through segregated alarm stations or a failure to include all available radiation sensors, such as safety’s criticality monitors can give the advantage to the adversary who might know to disable camera systems, but would most likely be unaware of other highly relevant sensors in a nuclear facility.This paper will briefly explore operational safeguards, safety, and security by design (3S) at a high level for domestic and State facilities, identify possible weaknesses, and propose future administrative and technical methods, to strengthen the facility system’s response to threats.« less
[Assessment of the Space Station Program
NASA Technical Reports Server (NTRS)
Kerrebrock, Jack L.
1994-01-01
This letter report by the National Research Council's (NRC's) Aeronautics and Space Engineering Board addresses comments on NASA's response to the Board's 1993 letter report, NASA's response to technical and management recommendations from previous NRC technical reports on the Space Station, and an assessment of the current International Space Station Alpha (ISSA) program.
Handheld laser scanner automatic registration based on random coding
NASA Astrophysics Data System (ADS)
He, Lei; Yu, Chun-ping; Wang, Li
2011-06-01
Current research on Laser Scanner often focuses mainly on the static measurement. Little use has been made of dynamic measurement, that are appropriate for more problems and situations. In particular, traditional Laser Scanner must Keep stable to scan and measure coordinate transformation parameters between different station. In order to make the scanning measurement intelligently and rapidly, in this paper ,we developed a new registration algorithm for handleheld laser scanner based on the positon of target, which realize the dynamic measurement of handheld laser scanner without any more complex work. the double camera on laser scanner can take photograph of the artificial target points to get the three-dimensional coordinates, this points is designed by random coding. And then, a set of matched points is found from control points to realize the orientation of scanner by the least-square common points transformation. After that the double camera can directly measure the laser point cloud in the surface of object and get the point cloud data in an unified coordinate system. There are three major contributions in the paper. Firstly, a laser scanner based on binocular vision is designed with double camera and one laser head. By those, the real-time orientation of laser scanner is realized and the efficiency is improved. Secondly, the coding marker is introduced to solve the data matching, a random coding method is proposed. Compared with other coding methods,the marker with this method is simple to match and can avoid the shading for the object. Finally, a recognition method of coding maker is proposed, with the use of the distance recognition, it is more efficient. The method present here can be used widely in any measurement from small to huge obiect, such as vehicle, airplane which strengthen its intelligence and efficiency. The results of experiments and theory analzing demonstrate that proposed method could realize the dynamic measurement of handheld laser scanner. Theory analysis and experiment shows the method is reasonable and efficient.
Space Station Freedom: A foothold on the future
NASA Technical Reports Server (NTRS)
1989-01-01
An overview of the Space Station Freedom is given. Its modules are discussed and illustrated along with its microgravity research facilities. These facilities include the advanced protein crystal growth facility, the containerless processing facility, a furnace facility, a combustion facility, and a fluid physics/dynamics facility. The topic of living in space is also addressed.
A facility for training Space Station astronauts
NASA Technical Reports Server (NTRS)
Hajare, Ankur R.; Schmidt, James R.
1992-01-01
The Space Station Training Facility (SSTF) will be the primary facility for training the Space Station Freedom astronauts and the Space Station Control Center ground support personnel. Conceptually, the SSTF will consist of two parts: a Student Environment and an Author Environment. The Student Environment will contain trainers, instructor stations, computers and other equipment necessary for training. The Author Environment will contain the systems that will be used to manage, develop, integrate, test and verify, operate and maintain the equipment and software in the Student Environment.
Cell module and fuel conditioner development
NASA Technical Reports Server (NTRS)
Hoover, D. Q., Jr.
1981-01-01
The design features and plans for fabrication of Stacks 564 and 800 are described. The results of the OS/IES loop testing of Stack 562, endurance testing of Stack 560 and the post test analysis of Stack 561 are reported. Progress on construction and modification of the fuel cell test facilities and the 10 kW reformer test station is described. Efforts to develop the technical data base for the fuel conditioning system included vendor contacts, packed bed heat transfer tests, development of the BOLTAR computer program, and work on the detailed design of the 10 kW reformer are described.
NASA Astrophysics Data System (ADS)
Nikolaeva, L. A.; Khusaenova, A. Z.
2014-05-01
A method for utilizing production wastes is considered, and a process circuit arrangement is proposed for utilizing a mixture of activated silt and sludge from chemical water treatment by incinerating it with possible heat recovery. The sorption capacity of the products from combusting a mixture of activated silt and sludge with respect to gaseous emissions is experimentally determined. A periodic-duty adsorber charged with a fixed bed of sludge is calculated, and the heat-recovery boiler efficiency is estimated together with the technical-economic indicators of the proposed utilization process circuit arrangement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be... maintain the identity of certified technical animal fats and materials used in their preparation, and...
NASA Astrophysics Data System (ADS)
Kozlovskaya, Inessa B.; Grigoriev, Anatoly I.
2004-08-01
The system of countermeasures used by Russian cosmonauts in space flights on board of International Space Station (ISS) was based on the developed and tested in flights on board of Russian space stations. It included as primary components: physical methods aimed to maintain the distribution of fluids at levels close to those experienced on Earth; physical exercises and loading suits aimed to load the musculoskeletal and the cardiovascular systems; measures that prevent the loss of fluids, mainly, water-salt additives which aid to maintain orthostatic tolerance and endurance to gravitational overloads during the return to Earth; well-balanced diet and medications directed to correct possible negative reactions of the body to weightlessness. Fulfillment of countermeasure's protocols inflight was thoroughly controlled. Efficacy of countermeasures used were assessed both in-and postflight. The results of studies showed that degrees of alterations recorded in different physiological systems after ISS space flights in Russian cosmonauts were significantly higher than those recorded after flights on the Russian space stations. This phenomenon was caused by the failure of the ISS crews to execute fully the prescribed countermeasures' protocols which was as a rule excused by technical imperfectness of exercise facilities, treadmill TVIS particularly.
Life sciences utilization of Space Station Freedom
NASA Technical Reports Server (NTRS)
Chambers, Lawrence P.
1992-01-01
Space Station Freedom will provide the United States' first permanently manned laboratory in space. It will allow, for the first time, long term systematic life sciences investigations in microgravity. This presentation provides a top-level overview of the planned utilization of Space Station Freedom by NASA's Life Sciences Division. The historical drivers for conducting life sciences research on a permanently manned laboratory in space as well as the advantages that a space station platform provides for life sciences research are discussed. This background information leads into a description of NASA's strategy for having a fully operational International Life Sciences Research Facility by the year 2000. Achieving this capability requires the development of the five discipline focused 'common core' facilities. Once developed, these facilities will be brought to the space station during the Man-Tended Capability phase, checked out and brought into operation. Their delivery must be integrated with the Space Station Freedom manifest. At the beginning of Permanent Manned Capability, the infrastructure is expected to be completed and the Life Sciences Division's SSF Program will become fully operational. A brief facility description, anticipated launch date and a focused objective is provided for each of the life sciences facilities, including the Biomedical Monitoring and Countermeasures (BMAC) Facility, Gravitational Biology Facility (GBF), Gas Grain Simulation Facility (GGSF), Centrifuge Facility (CF), and Controlled Ecological Life Support System (CELSS) Test Facility. In addition, hardware developed by other NASA organizations and the SSF International Partners for an International Life Sciences Research Facility is also discussed.
Biomass power for rural development. Technical progress report, October 1--December 31, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill Power Station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the fourth quarter of 1997 the Consortium submitted a Phase-2 proposal. A few of the other more important milestones are outlined below. The first quarter of 1998 will be dominated by pre-planting activity in the spring.« less
GENESIS 2: Advanced lunar outpost
NASA Technical Reports Server (NTRS)
Moore, Gary T.
1991-01-01
Advanced, second-generation lunar habitats for astronauts and mission specialists working on the Moon are investigated. The work was based on design constraints set forth in previous publications. Design recommendations are based on environmental response to the lunar environment, habitability, safety, near-term technology, replaceability and modularity, and suitability for NASA lunar research missions in the early 21st century. Scientists, engineers, and architects from NASA/JSC, Wisconsin aeronautical industry, and area universities gave technical input and offered critiques at design reviews throughout the process. The recommended design uses a lunar lava tube, with construction using a combination of Space Station Freedom-derived modules and lightweight Kevlar-laminate inflatables. The outpost includes research laboratories and biotron, crew quarters and support facility, mission control, health maintenance facility, and related areas for functional and psychological requirements. Furniture, specialized equipment, and lighting are included in the design analysis.
Development and applications of nondestructive evaluation at Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Whitaker, Ann F.
1990-01-01
A brief description of facility design and equipment, facility usage, and typical investigations are presented for the following: Surface Inspection Facility; Advanced Computer Tomography Inspection Station (ACTIS); NDE Data Evaluation Facility; Thermographic Test Development Facility; Radiographic Test Facility; Realtime Radiographic Test Facility; Eddy Current Research Facility; Acoustic Emission Monitoring System; Advanced Ultrasonic Test Station (AUTS); Ultrasonic Test Facility; and Computer Controlled Scanning (CONSCAN) System.
MR-guided radiofrequency ablation of hepatic malignancies at 1.5 T: initial results.
Mahnken, Andreas H; Buecker, Arno; Spuentrup, Elmar; Krombach, Gabriele A; Henzler, Dietrich; Günther, Rolf W; Tacke, Josef
2004-03-01
To assess the feasibility of magnetic resonance (MR)-guided radiofrequency ablation (RFA) of hepatic malignancies using a high-field MR scanner. A total of 10 patients with 14 primary (N = 1) or secondary (N = 13) hepatic malignancies underwent MR-guided RFA using a closed-bore 1.5 T MR scanner. Lesion diameters ranged from 2.0 cm to 4.7 cm. RFA was performed using a 200-W generator in combination with a 3.5-cm LeVeen electrode applying a standardized energy protocol. RFA was technically feasible in all patients. Necrosis diameter ranged from 2.5 cm to 6.8 cm. The mean follow-up period is 12.2 (1-18) months. In nine out of 10 patients, local tumor control was achieved. For this purpose, a second CT-guided RFA was required in two patients. In four patients, multifocal hepatic tumor progression occurred, with the treated lesion remaining tumor-free in three of these patients. Two patients showed extrahepatic tumor progression. Four patients remained tumor-free. No major complications occurred. MR-guided RFA of hepatic malignancies in a closed-bore high-field MR scanner is technically feasible and safe. It can be advantageous in locations considered unfavorable for CT-guided puncture or in patients in which iodinated contrast material is contraindicated. Copyright 2004 Wiley-Liss, Inc.
The International Space Station, Providing Opportunities to Tackle Most Challenging Questions
NASA Astrophysics Data System (ADS)
Gregory, Frederick; Suzuki, Nantel
2002-01-01
The International Space Station (ISS) now soars overhead, representing NASA's newest research center. It is a fully autonomous facility more capable than any Space laboratory ever deployed, with over 60 thousand hours of experiment operations time completed to date. Technical performance has been exceptional in the deployment and operation of the over 300 thousand pounds of hardware and the over one million plus line of software on orbit. Yet many obstacles are yet to be overcome to realize its fullest potential. The Agency has recently revalidated its research objectives for ISS to identify and answer questions that cannot be studied here on earth. These objectives include fundamental and applied research as well as engineering technology. The International Space Station is our first full-service weigh station on the road map for human-robotic exploration beyond low earth orbit. It will provide answers to a breadth of research questions and it will enable our ability the successfully overcome hurdles in the areas of crew health and safety, human/robotic partnerships, and space systems performance that now impede future exploration. Management control for the development and operation of large complex space systems has become one of the most important skills to develop at NASA. Many issues have surfaced concerning ISS management and organization. These problems are being addressed and we are moving to resolve our deficiencies and demonstrate the high degree of managerial performance already seen in our attention to technical challenges and safety. This paper will address the steps being taken, and the road ahead to provide answers of importance for our society and to further humankind's quest for exploration.
NASA Technical Reports Server (NTRS)
Hebert, Phillip W., Sr.; Davis, Dawn M.; Turowski, Mark P.; Holladay, Wendy T.; Hughes, Mark S.
2012-01-01
The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition systems (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis development and deployment.
Stenzel, Christian
2016-09-01
The International Space Station (ISS) is the largest technical vehicle ever built by mankind. It provides a living area for six astronauts and also represents a laboratory in which scientific experiments are conducted in an extraordinary environment. The deployed sensor technology contributes significantly to the operational and scientific success of the station. The sensors on board the ISS can be thereby classified into two categories which differ significantly in their key features: (1) sensors related to crew and station health, and (2) sensors to provide specific measurements in research facilities. The operation of the station requires robust, long-term stable and reliable sensors, since they assure the survival of the astronauts and the intactness of the station. Recently, a wireless sensor network for measuring environmental parameters like temperature, pressure, and humidity was established and its function could be successfully verified over several months. Such a network enhances the operational reliability and stability for monitoring these critical parameters compared to single sensors. The sensors which are implemented into the research facilities have to fulfil other objectives. The high performance of the scientific experiments that are conducted in different research facilities on-board demands the perfect embedding of the sensor in the respective instrumental setup which forms the complete measurement chain. It is shown that the performance of the single sensor alone does not determine the success of the measurement task; moreover, the synergy between different sensors and actuators as well as appropriate sample taking, followed by an appropriate sample preparation play an essential role. The application in a space environment adds additional challenges to the sensor technology, for example the necessity for miniaturisation, automation, reliability, and long-term operation. An alternative is the repetitive calibration of the sensors. This approach, however, increases the operational overhead significantly. But meeting especially these requirements offers unique opportunities for testing these sensor technologies in harsh and dedicated environments which are not available on Earth, therefore pushing the related technologies and methodologies to their limits. The scientific objectives for selected experiments, representing a wide range of research fields, are presented, including the instrument setups and the implemented sensor technologies, and where available, the first scientific results are presented.
NASA Technical Reports Server (NTRS)
1983-01-01
Representative space based orbital transfer vehicles (OTV), ground based vehicle turnaround assessment, functional operational requirements and facilities, mission turnaround operations, a comparison of ground based versus space based tasks, activation of servicing facilities prior to IOC, fleet operations requirements, maintenance facilities, OTV servicing facilities, space station support requirements, and packaging for delivery are discussed.
36 CFR § 1254.80 - Does NARA allow me to use scanners or other personal copying equipment?
Code of Federal Regulations, 2013 CFR
2013-07-01
...). The supervisor administering the research room or the senior staff member on duty in the research room reviews the research room attendant's determination if you request. (b) Equipment platens or copy boards... archives or Presidential library, contact the facility first for approval. Not all facilities permit the...
Earth physicist describes US nuclear test monitoring system
NASA Astrophysics Data System (ADS)
1986-01-01
The U. S. capabilities to monitor underground nuclear weapons tests in the USSR was examined. American methods used in monitoring the underground nuclear tests are enumerated. The U. S. technical means of monitoring Solviet nuclear weapons testing, and whether it is possible to conduct tests that could not be detected by these means are examined. The worldwide seismic station network in 55 countries available to the U. S. for seismic detection and measurement of underground nuclear explosions, and also the systems of seismic research observatories in 15 countries and seismic grouping stations in 12 countries are outlined including the advanced computerized data processing capabilities of these facilities. The level of capability of the U. S. seismic system for monitoring nuclear tests, other, nonseismic means of monitoring, such as hydroacoustic and recording of effects in the atmosphere, ionosphere, and the Earth's magnetic field, are discussed.
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, executive director of the Center for the Advancement of Science in Space, talks to Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, executive director of the Center for the Advancement of Science in Space, talks to Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, executive director of the Center for the Advancement of Science in Space, talks to Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – Florida middle school students and their teachers greet students from other locations via webex before the start of the Zero Robotics finals competition. The Florida teams are at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
Commercial use of space - The space business era
NASA Technical Reports Server (NTRS)
Griffin, G. D.
1985-01-01
Progress and avenues being explored by NASA to hasten the commercialization of space are described. A task force has recommended that the effort begin at once, that bureaucratic barriers to commercial space activities be removed, and that a partnership between government and industry be seriously explored. The government role is to establish links with private industry, invest in high-leverage technologies and space facilities which will be attractive to commercial ventures, and contribute to commercial enterprises where risks are high and significant economic benefits can be foreseen. The government/industry relationship can be legally evinced by MOUs, joint endeavor agreements, technical exchange agreements and industrial guest investigator arrangements. The Space Station is the first step in that it allows Americans to live and work in space. It is expected that international participation in Space Station development and utilization will accelerate the space business era.
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Commander Pamela A. Melroy gives a close inspection to space shuttle Discovery in Orbiter Processing Facility bay 3. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Giving a close inspection to space shuttle Discovery in Orbiter Processing Facility bay 3 are Mission Specialist Stephanie D. Wilson and Commander Pamela A. Melroy. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-04
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 3, STS-120 Commander Pamela A. Melroy sits in the orbiter Discovery to inspect the cockpit windows. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-04
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 3, STS-120 Pilot George D. Zamka makes a close inspection of the cockpit window on the orbiter Discovery. Seated next to him is Commander Pamela A. Melroy. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. -In Orbiter Processing Facility bay 3, STS-120 Commander Pamela A. Melroy (center left) and Mission Specialist Stephanie D. Wilson (center right) are lowered in a bucket into Discovery's payload bay. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-04
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 3, STS-120 Commander Pamela A. Melroy makes a close inspection of the cockpit window on the orbiter Discovery. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-04
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 3,STS-120 Commander Pamela A. Melroy sits in the orbiter Discovery to inspect the cockpit windows. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-04
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 3, STS-120 Commander Pamela A. Melroy makes a close inspection of the cockpit window on the orbiter Discovery. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
Using mid-range laser scanners to digitize cultural-heritage sites.
Spring, Adam P; Peters, Caradoc; Minns, Tom
2010-01-01
Here, we explore new, more accessible ways of modeling 3D data sets that both professionals and amateurs can employ in areas such as architecture, forensics, geotechnics, cultural heritage, and even hobbyist modeling. To support our arguments, we present images from a recent case study in digital preservation of cultural heritage using a mid-range laser scanner. Our appreciation of the increasing variety of methods for capturing 3D spatial data inspired our research. Available methods include photogrammetry, airborne lidar, sonar, total stations (a combined electronic and optical survey instrument), and midand close-range scanning.1 They all can produce point clouds of varying density. In our case study, the point cloud produced by a mid-range scanner demonstrates how open source software can make modeling and disseminating data easier. Normally, researchers would model this data using expensive specialized software, and the data wouldn't extend beyond the laser-scanning community.
Xu, J; Reh, D D; Carey, J P; Mahesh, M; Siewerdsen, J H
2012-08-01
As cone-beam CT (CBCT) systems dedicated to various imaging specialties proliferate, technical assessment grounded in imaging physics is important to ensuring that image quality and radiation dose are quantified, understood, and justified. This paper involves technical assessment of a new CBCT scanner (CS 9300, Carestream Health, Rochester, NY) dedicated to imaging of the ear and sinuses for applications in otolaryngology-head and neck surgery (OHNS). The results guided evaluation of technique protocols to minimize radiation dose in a manner sufficient for OHNS imaging tasks. The technical assessment focused on the imaging performance and radiation dose for each of seven technique protocols recommended by the manufacturer: three sinus protocols and four ear (temporal bone) protocols. Absolute dose was measured using techniques adapted from AAPM Task Group Report No. 111, involving three stacked 16 cm diameter acrylic cylinders (CTDI phantoms) and a 0.6 cm(3) Farmer ionization chamber to measure central and peripheral dose. The central dose (D(o)) was also measured as a function of longitudinal position (z) within and beyond the primary radiation field to assess, for example, out-of-field dose to the neck. Signal-difference-to-noise ratio (SDNR) and Hounsfield unit (HU) accuracy were assessed in a commercially available quality assurance phantom (CATPHAN module CTP404, The Phantom Laboratory, Greenwich, NY) and a custom phantom with soft-tissue-simulating plastic inserts (Gammex RMI, Madison, WI). Spatial resolution was assessed both qualitatively (a line-pair pattern, CATPHAN module CTP528) and quantitatively (modulation transfer function, MTF, measured with a wire phantom). Imaging performance pertinent to various OHNS imaging tasks was qualitatively assessed using an anthropomorphic phantom as evaluated by two experienced OHNS specialists. The technical assessment motivated a variety of modifications to the manufacturer-specified protocols to provide reduced radiation dose without compromising pertinent task-based imaging performance. The revised protocols yielded D(o) ranging 2.9-5.7 mGy, representing a ∼30% reduction in dose from the original technique chart. Out-of-field dose was ∼10% of D(o) at a distance of ∼8 cm from the field edge. Soft-tissue contrast resolution was fairly limited (water-brain SDNR ∼0.4-0.7) while high-contrast performance was reasonably good (SDNR ∼2-4 for a polystyrene insert in the CATPHAN). The scanner does not demonstrate (or claim to provide) accurate HU and exhibits a systematic error in CT number that could potentially be addressed by further calibration. The spatial resolution is ∼10-16 lp∕cm as assessed in a line-pair phantom, with MTF exceeding 10% out to ∼20 lp∕cm. Qualitative assessment by expert readers suggested limited soft-tissue visibility but excellent high-contrast (bone) visualization with isotropic spatial resolution suitable to a broad spectrum of pertinent sinus and temporal bone imaging tasks. The CBCT scanner provided spatial and contrast resolution suitable to visualization of high-contrast morphology in sinus, maxillofacial, and otologic imaging applications. Rigorous technical assessment guided revision of technique protocols to reduce radiation dose while maintaining image quality sufficient for pertinent imaging tasks. The scanner appears well suited to high-contrast sinus and temporal bone imaging at doses comparable to or less than that reported for conventional diagnostic CT of the head.
Factors shaping the evolution of electronic documentation systems
NASA Technical Reports Server (NTRS)
Dede, Christopher J.; Sullivan, Tim R.; Scace, Jacque R.
1990-01-01
The main goal is to prepare the space station technical and managerial structure for likely changes in the creation, capture, transfer, and utilization of knowledge. By anticipating advances, the design of Space Station Project (SSP) information systems can be tailored to facilitate a progression of increasingly sophisticated strategies as the space station evolves. Future generations of advanced information systems will use increases in power to deliver environmentally meaningful, contextually targeted, interconnected data (knowledge). The concept of a Knowledge Base Management System is emerging when the problem is focused on how information systems can perform such a conversion of raw data. Such a system would include traditional management functions for large space databases. Added artificial intelligence features might encompass co-existing knowledge representation schemes; effective control structures for deductive, plausible, and inductive reasoning; means for knowledge acquisition, refinement, and validation; explanation facilities; and dynamic human intervention. The major areas covered include: alternative knowledge representation approaches; advanced user interface capabilities; computer-supported cooperative work; the evolution of information system hardware; standardization, compatibility, and connectivity; and organizational impacts of information intensive environments.
NASA Astrophysics Data System (ADS)
Hart, Darren; Pearce, Nathan; Starovoit, Yuri; Guralp, Cansun
2014-05-01
Since the Comprehensive Nuclear-Test-Ban Treaty was opened for signature in 1996, nearly 80% of the network has been certified as operational, and those stations are sending data to the International Data Centre (IDC) in Vienna. Several International Monitoring System (IMS) monitoring facilities have been in operation for close to 15 years, and several certified stations are facing equipment obsolescence issues. The search for engineering solutions to replace obsolete hardware components is guided by two primary goals: 1) be compliant with IMS minimum technical requirements and 2) be able to be integrated with the existing system. To reduce the development and verification time necessary to address obsolescence in equipment, the PTS has requested the preproduction testing of the recently revised Guralp CMG-DM24AM digitizer. Performing preproduction testing has helped in identifying issues, which Guralp Systems has resolved. In our poster, we will review the reasons for the digitizer updates, present results of the preproduction testing of the Guralp digitizer, and comment on the value this process has provided to the IMS operation.
49 CFR 192.171 - Compressor stations: Additional safety equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Compressor stations: Additional safety equipment... Pipeline Components § 192.171 Compressor stations: Additional safety equipment. (a) Each compressor station must have adequate fire protection facilities. If fire pumps are a part of these facilities, their...
77 FR 62512 - Radio Broadcasting Services; AM or FM Proposals To Change the Community of License.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
..., Station NEW, Facility ID 189518, BNPH- 20110629BVH, From ROTAN, TX, To ROSCOE, TX; HI-LINE RADIO...; OHANA BROADCAST COMPANY LLC, Station KSHK, Facility ID 62228, BPH- 20120822AAH, From KEKAHA, HI, To HANAMAULU, HI; OHANA BROADCAST COMPANY LLC, Station KUAI, Facility ID 1752, BP-20120822AAO, From ELEELE, HI...
76 FR 14394 - Radio Broadcasting Services; AM or FM Proposals To Change the Community of License
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
..., NY; CUMULUS LICENSING LLC, Station KRRF, Facility ID 10329, BPH-20110218ABV, From GOLETA, CA, To OAK VIEW, CA; CUMULUS LICENSING LLC, Station KRUZ, Facility ID 3159, BPH-20110218ABW, From SANTA BARBARA..., BPH-20091211AFR, From MEXIA, TX, To BELLMEAD, TX; MICHAEL GREENE, Station KOYD, Facility ID 166015...
Biomass power for rural development. Technical progress report, May 1, 1996--December 31, 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Developing commercial energy crops for power generation by the year 2000 is the focus of the DOE/USDA sponsored Biomass Power for Rural Development project. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Facette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG). Phase-II of the project willmore » focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. There will be testing of the energy crop as part of the gasification trials expected to occur at BED`s McNeill power station and potentially at one of GPU`s facilities. Phase-III will represent full-scale commercialization of the energy crop and power generation on a sustainable basis. Willow has been selected as the energy crop of choice for many reasons. Willow is well suited to the climate of the Northeastern United States, and initial field trials have demonstrated that the yields required for the success of the project are obtainable. Like other energy crops, willow has rural development benefits and could serve to diversify local crop production, provide new sources of income for participating growers, and create new jobs. Willow could be used to put a large base of idle acreage back into crop production. Additionally, the willow coppicing system integrates well with current farm operations and utilizes agricultural practices that are already familiar to farmers.« less
DOT National Transportation Integrated Search
2017-02-01
The authors reviewed the literature on planning intermodal transit facilities, extracting recommendations about station and station-area design and land uses, operation of transportation services, and policy actions for station-area planning. They al...
MFPs: A Bundle of Possibilities
ERIC Educational Resources Information Center
Waters, John K.
2007-01-01
This article describes how the new generation of multifunction printers (MFP) couple diverse software with powerful hardware, bringing a multitude of options to educators. All of the major printer-scanner-copier makers have the education market in their crosshairs, but Lexmark's new Education Station targets K-12 with a unique combination of…
Space Station tethered refueling facility operations
NASA Technical Reports Server (NTRS)
Kiefel, E. R.; Rudolph, L. K.; Fester, D. A.
1986-01-01
The space-based orbital transfer vehicle will require a large cryogenic fuel storage facility at the Space Station. An alternative to fuel storage onboard the Space Station, is on a tethered orbital refueling facility (TORF) which is separated from the Space Station by a sufficient distance to induce a gravity gradient to settle the propellants. Facility operations are a major concern associated with a tethered LO2/LH2 storage depot. A study was carried out to analyze these operations so as to identify the preferred TORF deployment direction (up or down) and whether the TORF should be permanently or intermittently deployed. The analyses considered safety, contamination, rendezvous, servicing, transportation rate, communication, and viewing. An upwardly, intermittently deployed facility is the preferred configuration for a tethered cryogenic fuel storage.
A health maintenance facility for space station freedom
NASA Technical Reports Server (NTRS)
Billica, R. D.; Doarn, C. R.
1991-01-01
We describe a health care facility to be built and used on an orbiting space station in low Earth orbit. This facility, called the health maintenance facility, is based on and modeled after isolated terrestrial medical facilities. It will provide a phased approach to health care for the crews of Space Station Freedom. This paper presents the capabilities of the health maintenance facility. As Freedom is constructed over the next decade there will be an increase in activities, both construction and scientific. The health maintenance facility will evolve with this process until it is a mature, complete, stand-alone health care facility that establishes a foundation to support interplanetary travel. As our experience in space continues to grow so will the commitment to providing health care.
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
Space station automation study: Autonomous systems and assembly, volume 2
NASA Technical Reports Server (NTRS)
Bradford, K. Z.
1984-01-01
This final report, prepared by Martin Marietta Denver Aerospace, provides the technical results of their input to the Space Station Automation Study, the purpose of which is to develop informed technical guidance in the use of autonomous systems to implement space station functions, many of which can be programmed in advance and are well suited for automated systems.
Drawing and Landscape Simulation for Japanese Garden by Using Terrestrial Laser Scanner
NASA Astrophysics Data System (ADS)
Kumazaki, R.; Kunii, Y.
2015-05-01
Recently, many laser scanners are applied for various measurement fields. This paper investigates that it was useful to use the terrestrial laser scanner in the field of landscape architecture and examined a usage in Japanese garden. As for the use of 3D point cloud data in the Japanese garden, it is the visual use such as the animations. Therefore, some applications of the 3D point cloud data was investigated that are as follows. Firstly, ortho image of the Japanese garden could be outputted for the 3D point cloud data. Secondly, contour lines of the Japanese garden also could be extracted, and drawing was became possible. Consequently, drawing of Japanese garden was realized more efficiency due to achievement of laborsaving. Moreover, operation of the measurement and drawing could be performed without technical skills, and any observers can be operated. Furthermore, 3D point cloud data could be edited, and some landscape simulations that extraction and placement of tree or some objects were became possible. As a result, it can be said that the terrestrial laser scanner will be applied in landscape architecture field more widely.
NASA Technical Reports Server (NTRS)
Killian, D. A.; Menninger, F. J.; Gorman, T.; Glenn, P.
1988-01-01
The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.
NASA Technical Reports Server (NTRS)
McCurry, J.
1995-01-01
The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).
Flat-plate solar array project. Volume 8: Project analysis and integration
NASA Technical Reports Server (NTRS)
Mcguire, P.; Henry, P.
1986-01-01
Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
... Atomic Electric Company, Yankee Nuclear Power Station, Confirmatory Order Modifying License (Effective... of 10 CFR part 72, Subpart K at the Yankee Nuclear Power Station. The facility is located at the... Facility Operating License for Yankee Nuclear Power Station must be modified to include provisions with...
Tukey, Melissa H; Clark, Jack A; Bolton, Rendelle; Kelley, Michael J; Slatore, Christopher G; Au, David H; Wiener, Renda Soylemez
2016-10-01
To mitigate the potential harms of screening, professional societies recommend that lung cancer screening be conducted in multidisciplinary programs with the capacity to provide comprehensive care, from screening through pulmonary nodule evaluation to treatment of screen-detected cancers. The degree to which this standard can be met at the national level is unknown. To assess the readiness of clinical facilities in a national healthcare system for implementation of comprehensive lung cancer screening programs, as compared with the ideal described in policy recommendations. This was a cross-sectional, self-administered survey of staff pulmonologists in pulmonary outpatient clinics in Veterans Health Administration facilities. The facility-level response rate was 84.1% (106 of 126 facilities with pulmonary clinics); 88.7% of facilities showed favorable provider perceptions of the evidence for lung cancer screening, and 73.6% of facilities had a favorable provider-perceived local context for screening implementation. All elements of the policy-recommended infrastructure for comprehensive screening programs were present in 36 of 106 facilities (34.0%); the most common deficiencies were the lack of on-site positron emission tomography scanners or radiation oncology services. Overall, 26.5% of Veterans Health Administration facilities were ideally prepared for lung cancer screening implementation (44.1% if the policy recommendations for on-site positron emission tomography scanners and radiation oncology services were waived). Many facilities may be less than ideally positioned for the implementation of comprehensive lung cancer screening programs. To ensure safe, effective screening, hospitals may need to invest resources or coordinate care with facilities that can offer comprehensive care for screening through downstream evaluation and treatment of screen-detected cancers.
NASA Technical Reports Server (NTRS)
Cook, M.
1990-01-01
Qualification testing of Combustion Engineering's AMDATA Intraspect/98 Data Acquisition and Imaging System that applies to the redesigned solid rocket motor (RSRM) case membrane case-to-insulation bondline inspection was performed. Testing was performed at M-67, the Thiokol Corp. RSRM Assembly Facility. The purpose of the inspection was to verify the integrity of the case membrane case-to-insulation bondline. The case membrane scanner was calibrated on the redesigned solid rocket motor case segment calibration standard, which had an intentional 1.0 by 1.0 in. case-to-insulation unbond. The case membrane scanner was then used to scan a 20 by 20 in. membrane area of the case segment. Calibration of the scanner was then rechecked on the calibration standard to ensure that the calibration settings did not change during the case membrane scan. This procedure was successfully performed five times to qualify the unbond detection capability of the case membrane scanner.
Fifth anniversary of the first element of the International Spac
2003-12-03
In the Space Station Processing Facility, (from left) David Bethay, Boeing/ISS Florida Operations; Charlie Precourt, deputy manager of the International Space Station Program; and Tip Talone, director of Space Station and Payload Processing, give an overview of Space Station processing for the media. Members of the media were invited to commemorate the fifth anniversary of the launch of the first element of the International Space Station by touring the Space Station Processing Facility (SSPF) at KSC. Reporters also had the opportunity to see Space Station hardware that is being processed for deployment once the Space Shuttles return to flight. The facility tour also included an opportunity for reporters to talk with NASA and Boeing mission managers about the various hardware elements currently being processed for flight.
A Space Station tethered orbital refueling facility
NASA Technical Reports Server (NTRS)
Fester, D. A.; Rudolph, L. K.; Kiefel, E. R.
1985-01-01
A planned function of the Space Station is to refurbish and refuel an advanced space-based LO2/LH2 orbit transfer vehicle. An alternative to propellant storage at the station is to use a remote facility tied to the station with a long tether. Preliminary design of such a facility is described with emphasis on fluid transfer and storage requirements. Using tether lengths of at least 300 ft, gravity gradient forces will dominate surface tension in such a system. Although gravity driven transfer is difficult because of line pressure drops, fluid settling over the tank outlet greatly alleviates acquisition concerns and will facilitate vented tank fills. The major concern with a tethered orbital refueling facility is its considerable operational complexity including transport of the OTV to and from the facility.
Zhang, Yingying; Wang, Juncheng; Vorontsov, A M; Hou, Guangli; Nikanorova, M N; Wang, Hongliang
2014-01-01
The international marine ecological safety monitoring demonstration station in the Yellow Sea was developed as a collaborative project between China and Russia. It is a nonprofit technical workstation designed as a facility for marine scientific research for public welfare. By undertaking long-term monitoring of the marine environment and automatic data collection, this station will provide valuable information for marine ecological protection and disaster prevention and reduction. The results of some initial research by scientists at the research station into predictive modeling of marine ecological environments and early warning are described in this paper. Marine ecological processes are influenced by many factors including hydrological and meteorological conditions, biological factors, and human activities. Consequently, it is very difficult to incorporate all these influences and their interactions in a deterministic or analysis model. A prediction model integrating a time series prediction approach with neural network nonlinear modeling is proposed for marine ecological parameters. The model explores the natural fluctuations in marine ecological parameters by learning from the latest observed data automatically, and then predicting future values of the parameter. The model is updated in a "rolling" fashion with new observed data from the monitoring station. Prediction experiments results showed that the neural network prediction model based on time series data is effective for marine ecological prediction and can be used for the development of early warning systems.
Stress Computed Tomography Myocardial Perfusion Imaging: A New Topic in Cardiology.
Seitun, Sara; Castiglione Morelli, Margherita; Budaj, Irilda; Boccalini, Sara; Galletto Pregliasco, Athena; Valbusa, Alberto; Cademartiri, Filippo; Ferro, Carlo
2016-02-01
Since its introduction about 15 years ago, coronary computed tomography angiography has become today the most accurate clinical instrument for noninvasive assessment of coronary atherosclerosis. Important technical developments have led to a continuous stream of new clinical applications together with a significant reduction in radiation dose exposure. Latest generation computed tomography scanners (≥ 64 slices) allow the possibility of performing static or dynamic perfusion imaging during stress by using coronary vasodilator agents (adenosine, dipyridamole, or regadenoson), combining both functional and anatomical information in the same examination. In this article, the emerging role and state-of-the-art of myocardial computed tomography perfusion imaging are reviewed and are illustrated by clinical cases from our experience with a second-generation dual-source 128-slice scanner (Somatom Definition Flash, Siemens; Erlangen, Germany). Technical aspects, data analysis, diagnostic accuracy, radiation dose and future prospects are reviewed. Copyright © 2015 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.
NASA Technical Reports Server (NTRS)
1972-01-01
Information backing up the key features of the manipulator system concept and detailed technical information on the subsystems are presented. Space station assembly and shuttle cargo handling tasks are emphasized in the concept analysis because they involve shuttle berthing, transferring the manipulator boom between shuttle and station, station assembly, and cargo handling. Emphasis is also placed on maximizing commonality in the system areas of manipulator booms, general purpose end effectors, control and display, data processing, telemetry, dedicated computers, and control station design.
Hydrogen fuel dispensing station for transportation vehicles
DOE Office of Scientific and Technical Information (OSTI.GOV)
Singh, S.P.N.; Richmond, A.A.
1995-07-01
A technical and economic assessment is being conducted of a hydrogen fuel dispensing station to develop an understanding of the infrastructure requirements for supplying hydrogen fuel for mobile applications. The study includes a process design of a conceptual small-scale, stand-alone, grassroots fuel dispensing facility (similar to the present-day gasoline stations) producing hydrogen by steam reforming of natural gas. Other hydrogen production processes (such as partial oxidation of hydrocarbons and water electrolysis) were reviewed to determine their suitability for manufacturing the hydrogen. The study includes an assessment of the environmental and other regulatory permitting requirements likely to be imposed on amore » hydrogen fuel dispensing station for transportation vehicles. The assessment concludes that a dispensing station designed to produce 0.75 million standard cubic feet of fuel grade (99.99%+ purity) hydrogen will meet the fuel needs of 300 light-duty vehicles per day. Preliminary economics place the total capital investment (in 1994 US dollars) for the dispensing station at $4.5 million and the annual operating costs at around $1 million. A discounted cash-flow analysis indicates that the fuel hydrogen product price (excluding taxes) to range between $1.37 to $2.31 per pound of hydrogen, depending upon the natural gas price, the plant financing scenario, and the rate of return on equity capital. A report on the assessment is due in June 1995. This paper presents a summary of the current status of the assessment.« less
Design analysis of an MPI human functional brain scanner
Mason, Erica E.; Cooley, Clarissa Z.; Cauley, Stephen F.; Griswold, Mark A.; Conolly, Steven M.; Wald, Lawrence L.
2017-01-01
MPI’s high sensitivity makes it a promising modality for imaging brain function. Functional contrast is proposed based on blood SPION concentration changes due to Cerebral Blood Volume (CBV) increases during activation, a mechanism utilized in fMRI studies. MPI offers the potential for a direct and more sensitive measure of SPION concentration, and thus CBV, than fMRI. As such, fMPI could surpass fMRI in sensitivity, enhancing the scientific and clinical value of functional imaging. As human-sized MPI systems have not been attempted, we assess the technical challenges of scaling MPI from rodent to human brain. We use a full-system MPI simulator to test arbitrary hardware designs and encoding practices, and we examine tradeoffs imposed by constraints that arise when scaling to human size as well as safety constraints (PNS and central nervous system stimulation) not considered in animal scanners, thereby estimating spatial resolutions and sensitivities achievable with current technology. Using a projection FFL MPI system, we examine coil hardware options and their implications for sensitivity and spatial resolution. We estimate that an fMPI brain scanner is feasible, although with reduced sensitivity (20×) and spatial resolution (5×) compared to existing rodent systems. Nonetheless, it retains sufficient sensitivity and spatial resolution to make it an attractive future instrument for studying the human brain; additional technical innovations can result in further improvements. PMID:28752130
Technical Assistance for Arts Facilities: A Sourcebook. A Report.
ERIC Educational Resources Information Center
Educational Facilities Labs., Inc., New York, NY.
This booklet is a directory of sources of technical assistance on problems relating to physical facilities for arts organizations. Wherever possible, agencies and organizations are described in their own words. Technical assistance in the area of physical facilities encompasses planning, financing, acquiring, renovating, designing, and maintaining…
NASA Astrophysics Data System (ADS)
Hong, J.; Guala, M.; Chamorro, L. P.; Sotiropoulos, F.
2014-06-01
Despite major research efforts, the interaction of the atmospheric boundary layer with turbines and multi-turbine arrays at utility scale remains poorly understood today. This lack of knowledge stems from the limited number of utility-scale research facilities and a number of technical challenges associated with obtaining high-resolution measurements at field scale. We review recent results obtained at the University of Minnesota utility-scale wind energy research station (the EOLOS facility), which is comprised of a 130 m tall meteorological tower and a fully instrumented 2.5MW Clipper Liberty C96 wind turbine. The results address three major areas: 1) The detailed characterization of the wake structures at a scale of 36×36 m2 using a novel super-large-scale particle image velocimetry based on natural snowflakes, including the rich tip vortex dynamics and their correlation with turbine operations, control, and performance; 2) The use of a WindCube Lidar profiler to investigate how wind at various elevations influences turbine power fluctuation and elucidate the role of wind gusts on individual blade loading; and 3) The systematic quantification of the interaction between the turbine instantaneous power output and tower foundation strain with the incoming flow turbulence, which is measured from the meteorological tower.
Lewis Research Center space station electric power system test facilities
NASA Technical Reports Server (NTRS)
Birchenough, Arthur G.; Martin, Donald F.
1988-01-01
NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.
NASA directory of observation station locations, volume 1
NASA Technical Reports Server (NTRS)
1973-01-01
Geodetic information for NASA tracking stations and for observation stations cooperating in NASA geodetic satellite programs is presented. A Geodetic Data Sheet is provided for each station, giving the position of the station and describing briefly how it was established. Geodetic positions and geocentric coordinates of these stations are tabulated on local or major geodetic datums and on selected world geodetic systems. The principal tracking facilities used by NASA, including the Spaceflight Tracking and Data Network, the Deep Space Network, and several large radio telescopes are discussed. Positions of these facilities are tabulated on their local or national datums, the Mercury Spheroid 1960, the Modified Mercury Datum 1968, and the Spaceflight Tracking and Data Network System. Observation stations in the NASA Geodetic Satellites Program are included along with stations participating in the National Geodetic Satellite Program. Positions of these facilities are given on local or preferred major datums, and on the Modified Mercury Datum 1968.
49. View of waveguide system entering building no. 105 (typical ...
49. View of waveguide system entering building no. 105 (typical of all radar scanner buildings), showing testing connection points and monitoring equipment. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
53. View from ground level in building no. 105 showing ...
53. View from ground level in building no. 105 showing lower radar scanner switch with incoming waveguide and control switch. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Integrated scheduling and resource management. [for Space Station Information System
NASA Technical Reports Server (NTRS)
Ward, M. T.
1987-01-01
This paper examines the problem of integrated scheduling during the Space Station era. Scheduling for Space Station entails coordinating the support of many distributed users who are sharing common resources and pursuing individual and sometimes conflicting objectives. This paper compares the scheduling integration problems of current missions with those anticipated for the Space Station era. It examines the facilities and the proposed operations environment for Space Station. It concludes that the pattern of interdependecies among the users and facilities, which are the source of the integration problem is well structured, allowing a dividing of the larger problem into smaller problems. It proposes an architecture to support integrated scheduling by scheduling efficiently at local facilities as a function of dependencies with other facilities of the program. A prototype is described that is being developed to demonstrate this integration concept.
Unified Ultrasonic/Eddy-Current Data Acquisition
NASA Technical Reports Server (NTRS)
Chern, E. James; Butler, David W.
1993-01-01
Imaging station for detecting cracks and flaws in solid materials developed combining both ultrasonic C-scan and eddy-current imaging. Incorporation of both techniques into one system eliminates duplication of computers and of mechanical scanners; unifies acquisition, processing, and storage of data; reduces setup time for repetitious ultrasonic and eddy-current scans; and increases efficiency of system. Same mechanical scanner used to maneuver either ultrasonic or eddy-current probe over specimen and acquire point-by-point data. For ultrasonic scanning, probe linked to ultrasonic pulser/receiver circuit card, while, for eddy-current imaging, probe linked to impedance-analyzer circuit card. Both ultrasonic and eddy-current imaging subsystems share same desktop-computer controller, containing dedicated plug-in circuit boards for each.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station... if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline...
47 CFR 73.37 - Applications for broadcast facilities, showing required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Applications for broadcast facilities, showing... facilities, showing required. (a) No application will be accepted for a new station if the proposed operation... paragraph; and no application will be accepted for a change of the facilities of an existing station if the...
PET and MR imaging: the odd couple or a match made in heaven?
Catana, Ciprian; Guimaraes, Alexander R; Rosen, Bruce R
2013-05-01
PET and MR imaging are modalities routinely used for clinical and research applications. Integrated scanners capable of acquiring PET and MR imaging data in the same session, sequentially or simultaneously, have recently become available for human use. In this article, we describe some of the technical advances that allowed the development of human PET/MR scanners; briefly discuss methodologic challenges and opportunities provided by this novel technology; and present potential oncologic, cardiac, and neuropsychiatric applications. These examples range from studies that might immediately benefit from PET/MR to more advanced applications on which future development might have an even broader impact.
[Testicular cancer: a model to optimize the radiological follow-up].
Stebler, V; Pauchard, B; Schmidt, S; Valerio, M; De Bari, B; Berthold, D
2015-05-20
Despite being rare cancers, testicular seminoma and non-seminoma play an important role in oncology: they represent a model on how to optimize radiological follow-up, aiming at a lowest possible radiation exposure and secondary cancer risk. Males diagnosed with testicular cancer undergo frequently prolonged follow-up with CT-scans with potential toxic side effects, in particular secondary cancers. To reduce the risks linked to ionizing radiation, precise follow-up protocols have been developed. The number of recommended CT-scanners has been significantly reduced over the last 10 years. The CT scanners have evolved technically and new acquisition protocols have the potential to reduce the radiation exposure further.
The design of the CMOS wireless bar code scanner applying optical system based on ZigBee
NASA Astrophysics Data System (ADS)
Chen, Yuelin; Peng, Jian
2008-03-01
The traditional bar code scanner is influenced by the length of data line, but the farthest distance of the wireless bar code scanner of wireless communication is generally between 30m and 100m on the market. By rebuilding the traditional CCD optical bar code scanner, a CMOS code scanner is designed based on the ZigBee to meet the demands of market. The scan system consists of the CMOS image sensor and embedded chip S3C2401X, when the two dimensional bar code is read, the results show the inaccurate and wrong code bar, resulted from image defile, disturber, reads image condition badness, signal interference, unstable system voltage. So we put forward the method which uses the matrix evaluation and Read-Solomon arithmetic to solve them. In order to construct the whole wireless optics of bar code system and to ensure its ability of transmitting bar code image signals digitally with long distances, ZigBee is used to transmit data to the base station, and this module is designed based on image acquisition system, and at last the wireless transmitting/receiving CC2430 module circuit linking chart is established. And by transplanting the embedded RTOS system LINUX to the MCU, an applying wireless CMOS optics bar code scanner and multi-task system is constructed. Finally, performance of communication is tested by evaluation software Smart RF. In broad space, every ZIGBEE node can realize 50m transmission with high reliability. When adding more ZigBee nodes, the transmission distance can be several thousands of meters long.
NASA Technical Reports Server (NTRS)
Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V
1971-01-01
This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.
NASA Technical Reports Server (NTRS)
Hebert, Phillip W., Sr.; Hughes, Mark S.; Davis, Dawn M.; Turowski, Mark P.; Holladay, Wendy T.; Marshall, PeggL.; Duncan, Michael E.; Morris, Jon A.; Franzl, Richard W.
2012-01-01
The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition system (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis' development and deployment.
Experimental evaluation of ballistic hazards in imaging diagnostic center.
Karpowicz, Jolanta; Gryz, Krzysztof
2013-04-01
Serious hazards for human health and life and devices in close proximity to the magnetic resonance scanners (MRI scanners) include the effects of being hit by ferromagnetic objects attracted by static magnetic field (SMF) produced by scanner magnet - the so-called ballistic hazards classified among indirect electromagnetic hazards. International safety guidelines and technical literature specify different SMF threshold values regarding ballistic hazards - e.g. 3 mT (directive 2004/40/EC, EN 60601-2-33), and 30 mT (BMAS 2009, directive proposal 2011). Investigations presented in this article were performed in order to experimentally verify SMF threshold for ballistic hazards near MRI scanners used in Poland. Investigations were performed with the use of a laboratory source of SMF (0-30 mT) and MRI scanners of various types. The levels of SMF in which metal objects of various shapes and 0.4-500 g mass are moved by the field influence were investigated. The distance from the MRI scanners (0.2-3T) where hazards may occur were also investigated. Objects investigated under laboratory conditions were moved by SMF of 2.2-15 mT magnetic flux density when they were freely suspended, but were moved by the SMF of 5.6-22 mT when they were placed on a smooth surface. Investigated objects were moved in fields of 3.5-40 mT by MRI scanners. Distances from scanner magnet cover, where ballistic hazards might occur are: up to 0.5 m for 0.2-0.3T scanners; up to 1.3 m for 0.5T scanners; up to 2.0 m for 1.5T scanners and up to 2.5 m for 3T scanners (at the front and back of the magnet). It was shown that SMF of 3 mT magnetic flux density should be taken as the threshold for ballistic hazards. Such level is compatible with SMF limit value regarding occupational safety and health-protected areas/zones, where according to the Polish labor law the procedures of work environment inspection and prevention measures regarding indirect electromagnetic hazards should be applied. Presented results do not support the increase up to 30 mT of the SMF limit for protected area.
Near-field measurement facility plans at Lewis Research Center
NASA Technical Reports Server (NTRS)
Sharp, R. G.
1983-01-01
The direction of future antenna technology will be toward antennas which are large, both physically and electrically, will operate at frequencies up to 60 GHz, and are non-reciprocal and complex, implementing multiple-beam and scanning beam concepts and monolithic semiconductor devices and techniques. The acquisition of accurate antenna performance measurements is a critical part of the advanced antenna research program and represents a substantial antenna measurement technology challenge, considering the special characteristics of future spacecraft communications antennas. Comparison of various antenna testing techniques and their relative advantages and disadvantages shows that the near-field approach is necessary to meet immediate and long-term testing requirements. The LeRC facilities, the 22 ft x 22 ft horizontal antenna boresight planar scanner and the 60 ft x 60 ft vertical antenna boresight plant scanner (with a 60 GHz frequency and D/lamdba = 3000 electrical size capabilities), will meet future program testing requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Facilities. 351.10 Section 351.10... CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Facilities and Operations § 351.10 Facilities. (a) Facilities for the preparation, identification, and storage of the technical animal fat to be...
Integrated GNSS Attitude Determination and Positioning for Direct Geo-Referencing
Nadarajah, Nandakumaran; Paffenholz, Jens-André; Teunissen, Peter J. G.
2014-01-01
Direct geo-referencing is an efficient methodology for the fast acquisition of 3D spatial data. It requires the fusion of spatial data acquisition sensors with navigation sensors, such as Global Navigation Satellite System (GNSS) receivers. In this contribution, we consider an integrated GNSS navigation system to provide estimates of the position and attitude (orientation) of a 3D laser scanner. The proposed multi-sensor system (MSS) consists of multiple GNSS antennas rigidly mounted on the frame of a rotating laser scanner and a reference GNSS station with known coordinates. Precise GNSS navigation requires the resolution of the carrier phase ambiguities. The proposed method uses the multivariate constrained integer least-squares (MC-LAMBDA) method for the estimation of rotating frame ambiguities and attitude angles. MC-LAMBDA makes use of the known antenna geometry to strengthen the underlying attitude model and, hence, to enhance the reliability of rotating frame ambiguity resolution and attitude determination. The reliable estimation of rotating frame ambiguities is consequently utilized to enhance the relative positioning of the rotating frame with respect to the reference station. This integrated (array-aided) method improves ambiguity resolution, as well as positioning accuracy between the rotating frame and the reference station. Numerical analyses of GNSS data from a real-data campaign confirm the improved performance of the proposed method over the existing method. In particular, the integrated method yields reliable ambiguity resolution and reduces position standard deviation by a factor of about 0.8, matching the theoretical gain of 3/4 for two antennas on the rotating frame and a single antenna at the reference station. PMID:25036330
Integrated GNSS attitude determination and positioning for direct geo-referencing.
Nadarajah, Nandakumaran; Paffenholz, Jens-André; Teunissen, Peter J G
2014-07-17
Direct geo-referencing is an efficient methodology for the fast acquisition of 3D spatial data. It requires the fusion of spatial data acquisition sensors with navigation sensors, such as Global Navigation Satellite System (GNSS) receivers. In this contribution, we consider an integrated GNSS navigation system to provide estimates of the position and attitude (orientation) of a 3D laser scanner. The proposed multi-sensor system (MSS) consists of multiple GNSS antennas rigidly mounted on the frame of a rotating laser scanner and a reference GNSS station with known coordinates. Precise GNSS navigation requires the resolution of the carrier phase ambiguities. The proposed method uses the multivariate constrained integer least-squares (MC-LAMBDA) method for the estimation of rotating frame ambiguities and attitude angles. MC-LAMBDA makes use of the known antenna geometry to strengthen the underlying attitude model and, hence, to enhance the reliability of rotating frame ambiguity resolution and attitude determination. The reliable estimation of rotating frame ambiguities is consequently utilized to enhance the relative positioning of the rotating frame with respect to the reference station. This integrated (array-aided) method improves ambiguity resolution, as well as positioning accuracy between the rotating frame and the reference station. Numerical analyses of GNSS data from a real-data campaign confirm the improved performance of the proposed method over the existing method. In particular, the integrated method yields reliable ambiguity resolution and reduces position standard deviation by a factor of about 0:8, matching the theoretical gain of √ 3/4 for two antennas on the rotating frame and a single antenna at the reference station.
Accuracy Analysis of a Low-Cost Platform for Positioning and Navigation
NASA Astrophysics Data System (ADS)
Hofmann, S.; Kuntzsch, C.; Schulze, M. J.; Eggert, D.; Sester, M.
2012-07-01
This paper presents an accuracy analysis of a platform based on low-cost components for landmark-based navigation intended for research and teaching purposes. The proposed platform includes a LEGO MINDSTORMS NXT 2.0 kit, an Android-based Smartphone as well as a compact laser scanner Hokuyo URG-04LX. The robot is used in a small indoor environment, where GNSS is not available. Therefore, a landmark map was produced in advance, with the landmark positions provided to the robot. All steps of procedure to set up the platform are shown. The main focus of this paper is the reachable positioning accuracy, which was analyzed in this type of scenario depending on the accuracy of the reference landmarks and the directional and distance measuring accuracy of the laser scanner. Several experiments were carried out, demonstrating the practically achievable positioning accuracy. To evaluate the accuracy, ground truth was acquired using a total station. These results are compared to the theoretically achievable accuracies and the laser scanner's characteristics.
NASA Technical Reports Server (NTRS)
Saulsberry, Regor; Nichols, Charles
2012-01-01
This project is part of a multi-center effort to develop and validate critical NDE techniques which can be implemented into current and future NASA spacecraft COPV manufacturing processes. After decades of COPV development, manufacturing variance is still high and has necessitated higher safety factors and additional mass to be flown on spacecraft (reducing overall performance). Additionally, the NASA Engineering and Safety Center (NESC) indicated that nondestructive evaluation (NDE) was not adequately implemented during Shuttle and International Space Station (ISS) COPV manufacturing and provisions were not made for on-going structural integrity and health checks during the various spacecraft programs. This project helps to provide additional data needed to help address these issues. This project seeks to develop and install internal and external laser profilometers at COPV manufacturing facilities to provide data needed to improve COPV quality and consistency. This project also investigates other scanning techniques that will enhance the system to more completely meet manufacturing needs, thus transforming the profilometer into what has been termed the "Universal Manufacturing COPV Scanner".
Internationalization of the Space Station
NASA Technical Reports Server (NTRS)
Lottmann, R. V.
1985-01-01
Attention is given to the NASA Space Station system elements whose production is under consideration by potential foreign partners. The ESA's Columbus Program declaration encompasses studies of pressurized modules, unmanned payload carriers, and ground support facilities. Canada has expressed interest in construction and servicing facilities, solar arrays, and remote sensing facilities. Japanese studies concern a multipurpose experimental module concept. Each of these foreign investments would expand Space Station capabilities and lay the groundwork for long term partnerships.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center..., enroute facilities, terminal facilities, or at the David J. Hurley Air Traffic Control System Command...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center..., enroute facilities, terminal facilities, or at the David J. Hurley Air Traffic Control System Command...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center..., enroute facilities, terminal facilities, or at the David J. Hurley Air Traffic Control System Command...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center... Stations, Enroute or Terminal Facilities, and the David J. Hurley Air Traffic Control System Command Center..., enroute facilities, terminal facilities, or at the David J. Hurley Air Traffic Control System Command...
47 CFR 80.481 - Alternative technical parameters for AMTS transmitters.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Alternative technical parameters for AMTS transmitters. 80.481 Section 80.481 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Public Coast Stations Automated Systems § 80.481...
Valero, Enrique; Adán, Antonio; Cerrada, Carlos
2012-01-01
In this paper we present a method that automatically yields Boundary Representation Models (B-rep) for indoors after processing dense point clouds collected by laser scanners from key locations through an existing facility. Our objective is particularly focused on providing single models which contain the shape, location and relationship of primitive structural elements of inhabited scenarios such as walls, ceilings and floors. We propose a discretization of the space in order to accurately segment the 3D data and generate complete B-rep models of indoors in which faces, edges and vertices are coherently connected. The approach has been tested in real scenarios with data coming from laser scanners yielding promising results. We have deeply evaluated the results by analyzing how reliably these elements can be detected and how accurately they are modeled. PMID:23443369
47 CFR 87.307 - Cooperative use of facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES AVIATION SERVICES Flight Test Stations § 87.307 Cooperative use of facilities. (a) The Commission will license only one flight test land station per airport, except as provided in paragraph (d) of this section. (b) Flight test land stations located at an airport are required to provide service without...
17. CAPE COD AIR STATION PAVE PAWS FACILITY AERIAL VIEW ...
17. CAPE COD AIR STATION PAVE PAWS FACILITY AERIAL VIEW WITH PROJECT NEARING COMPLETION. VIEW SHOWS "A" FACE (LEFT) AND "B" FACE OF RADAR ARRAY SYSTEM. NOTE THAT NORTH IS GENERALLY TO RIGHT OF VIEW. - Cape Cod Air Station, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
47 CFR 73.37 - Applications for broadcast facilities, showing required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.37 Applications for broadcast facilities, showing required. (a) No application will be accepted for a new station if the proposed operation would involve overlap of signal strength contours with any other station as set forth below in this...
47 CFR 73.37 - Applications for broadcast facilities, showing required.
Code of Federal Regulations, 2013 CFR
2013-10-01
... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.37 Applications for broadcast facilities, showing required. (a) No application will be accepted for a new station if the proposed operation would involve overlap of signal strength contours with any other station as set forth below in this...
47 CFR 73.37 - Applications for broadcast facilities, showing required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.37 Applications for broadcast facilities, showing required. (a) No application will be accepted for a new station if the proposed operation would involve overlap of signal strength contours with any other station as set forth below in this...
47 CFR 73.37 - Applications for broadcast facilities, showing required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.37 Applications for broadcast facilities, showing required. (a) No application will be accepted for a new station if the proposed operation would involve overlap of signal strength contours with any other station as set forth below in this...
Conceptual planning for Space Station life sciences human research project
NASA Technical Reports Server (NTRS)
Primeaux, Gary R.; Miller, Ladonna J.; Michaud, Roger B.
1986-01-01
The Life Sciences Research Facility dedicated laboratory is currently undergoing system definition within the NASA Space Station program. Attention is presently given to the Humam Research Project portion of the Facility, in view of representative experimentation requirement scenarios and with the intention of accommodating the Facility within the Initial Operational Capability configuration of the Space Station. Such basic engineering questions as orbital and ground logistics operations and hardware maintenance/servicing requirements are addressed. Biospherics, calcium homeostasis, endocrinology, exercise physiology, hematology, immunology, muscle physiology, neurosciences, radiation effects, and reproduction and development, are among the fields of inquiry encompassed by the Facility.
Development of proton computed tomography detectors for applications in hadron therapy
NASA Astrophysics Data System (ADS)
Bashkirov, Vladimir A.; Johnson, Robert P.; Sadrozinski, Hartmut F.-W.; Schulte, Reinhard W.
2016-02-01
Radiation therapy with protons and heavier ions is an attractive form of cancer treatment that could enhance local control and survival of cancers that are currently difficult to cure and lead to less side effects due to sparing of normal tissues. However, particle therapy faces a significant technical challenge because one cannot accurately predict the particle range in the patient using data provided by existing imaging technologies. Proton computed tomography (pCT) is an emerging imaging modality capable of improving the accuracy of range prediction. In this paper, we describe the successive pCT scanners designed and built by our group with the goal to support particle therapy treatment planning and image guidance by reconstructing an accurate 3D map of the stopping power relative to water in patient tissues. The pCT scanners we have built to date consist of silicon telescopes, which track the proton before and after the object to be reconstructed, and an energy or range detector, which measures the residual energy and/or range of the protons used to evaluate the water equivalent path length (WEPL) of each proton in the object. An overview of a decade-long evolution of the conceptual design of pCT scanners and their calibration is given. Results of scanner performance tests are presented, which demonstrate that the latest pCT scanner approaches readiness for clinical applications in hadron therapy.
2. View of southerly DR 1 antenna looking north 25 ...
2. View of southerly DR 1 antenna looking north 25 degrees west and and showing radar scanner building no. 105 east face through antenna. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
3. View of middle DR 2 antenna looking north 30 ...
3. View of middle DR 2 antenna looking north 30 degrees west and showing radar scanner building no. 105 east face through antenna. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
47 CFR 74.1251 - Technical and equipment modifications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Translator Stations and FM Broadcast Booster Stations § 74.1251 Technical and equipment modifications. (a) No... translator or booster apparatus which has been certificated by the Commission without prior authority of the... identical power rating which has been certificated by the FCC for use by FM translator or FM booster...
47 CFR 74.1251 - Technical and equipment modifications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Translator Stations and FM Broadcast Booster Stations § 74.1251 Technical and equipment modifications. (a) No... translator or booster apparatus which has been certificated by the Commission without prior authority of the... identical power rating which has been certificated by the FCC for use by FM translator or FM booster...
47 CFR 74.1251 - Technical and equipment modifications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Translator Stations and FM Broadcast Booster Stations § 74.1251 Technical and equipment modifications. (a) No... translator or booster apparatus which has been certificated by the Commission without prior authority of the... identical power rating which has been certificated by the FCC for use by FM translator or FM booster...
47 CFR 74.1251 - Technical and equipment modifications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Translator Stations and FM Broadcast Booster Stations § 74.1251 Technical and equipment modifications. (a) No... translator or booster apparatus which has been certificated by the Commission without prior authority of the... identical power rating which has been certificated by the FCC for use by FM translator or FM booster...
47 CFR 74.1251 - Technical and equipment modifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Translator Stations and FM Broadcast Booster Stations § 74.1251 Technical and equipment modifications. (a) No... translator or booster apparatus which has been certificated by the Commission without prior authority of the... identical power rating which has been certificated by the FCC for use by FM translator or FM booster...
Navigation concepts for MR image-guided interventions.
Moche, Michael; Trampel, Robert; Kahn, Thomas; Busse, Harald
2008-02-01
The ongoing development of powerful magnetic resonance imaging techniques also allows for advanced possibilities to guide and control minimally invasive interventions. Various navigation concepts have been described for practically all regions of the body. The specific advantages and limitations of these concepts largely depend on the magnet design of the MR scanner and the interventional environment. Open MR scanners involve minimal patient transfer, which improves the interventional workflow and reduces the need for coregistration, ie, the mapping of spatial coordinates between imaging and intervention position. Most diagnostic scanners, in contrast, do not allow the physician to guide his instrument inside the magnet and, consequently, the patient needs to be moved out of the bore. Although adequate coregistration and navigation concepts for closed-bore scanners are technically more challenging, many developments are driven by the well-known capabilities of high-field systems and their better economic value. Advanced concepts such as multimodal overlays, augmented reality displays, and robotic assistance devices are still in their infancy but might propel the use of intraoperative navigation. The goal of this work is to give an update on MRI-based navigation and related techniques and to briefly discuss the clinical experience and limitations of some selected systems. (Copyright) 2008 Wiley-Liss, Inc.
FAA Certificated Maintenance Agencies Directory (1997)
DOT National Transportation Integrated Search
1997-05-06
This advisory circular (AC) transmits a consolidated directory of all : certificated Federal Aviation Administration (FAA) repair stations and : manufacturer's maintenance facilities. The repair stations and manufacturer's : maintenance facilities we...
2014-08-15
CAPE CANAVERAL, Fla. – Former astronaut Greg Johnson, at left, executive director of the Center for the Advancement of Science in Space, and NASA Kennedy Space Center Director Bob Cabana, visit with Florida middle school students and their teachers before the start of the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. Students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2014-08-15
CAPE CANAVERAL, Fla. – The Kennedy Space Center Visitor Complex Spaceperson poses for a photo with Carver Middle School students and their teacher from Orlando, Florida, during the Zero Robotics finals competition at NASA Kennedy Space Center's Space Station Processing Facility in Florida. The team, members of the After School All-Stars, were regional winners and advanced to the final competition. For the competition, students designed software to control Synchronized Position Hold Engage and Reorient Experimental Satellites, or SPHERES, and competed with other teams locally. The Zero Robotics is a robotics programming competition where the robots are SPHERES. The competition starts online, where teams program the SPHERES to solve an annual challenge. After several phases of virtual competition in a simulation environment that mimics the real SPHERES, finalists are selected to compete in a live championship aboard the space station. Students compete to win a technically challenging game by programming their strategies into the SPHERES satellites. The programs are autonomous and the students cannot control the satellites during the test. Photo credit: NASA/Daniel Casper
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. In Orbiter Processing Facility bay 3, Expedition 16 Flight Engineer Daniel M. Tani is given the opportunity to operate a camera that will fly on the mission. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Inspecting the thermal protection system, or TPS, tiles under space shuttle Discovery in Orbiter Processing Facility bay 3 is Mission Specialist Paolo A. Nespoli, a European Space Agency astronaut from Italy. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Inspecting the thermal protection system, or TPS, tiles under space shuttle Discovery in Orbiter Processing Facility bay 3 is Mission Specialist Scott E. Parazynski, the lead spacewalker on the mission. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 3, STS-120 Mission Specialists Scott E. Parazynski, Douglas H. Wheelock and Paolo A. Nespoli inspect tools they will use during the mission. Nespoli is a European Space Agency astronaut from Italy. With them is Allison Bolinger, an EVA technician with NASA. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Receiving a briefing on the thermal protection system, or TPS, tiles on space shuttle Discovery in Orbiter Processing Facility bay 3 are Commander Pamela A. Melroy and Mission Specialist Paolo A. Nespoli, a European Space Agency astronaut from Italy. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 3, STS-120 crew members practice handling tools they will use during the mission. From left are Mission Specialist Stephanie D. Wilson, Pilot George D. Zamka and Commander Pamela A. Melroy. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - Dressed in clean-room suits are STS-120 Commander Pamela A. Melroy (left) and Mission Specialist Stephanie D. Wilson (center), getting ready to get into the bucket that will lower them into Discovery's payload bay in bay 3 of the Orbiter Processing Facility. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 3, STS-120 Mission Specialists Scott E. Parazynski, Douglas H. Wheelock and Paolo A. Nespoli inspect tools they will use during the mission. Nespoli is a European Space Agency astronaut from Italy. Behind them is Allison Bolinger, an EVA technician with NASA. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-04
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 3, STS-120 Pilot George D. Zamka makes a close inspection of the cockpit window on the orbiter Discovery. Seated next to him is Commander Pamela A. Melroy. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Discovery's payload bay in Orbiter Processing Facility bay 3, STS-120 crew members are getting hands-on experience with a winch that is used to manually close the payload bay doors in the event that becomes necessary. At right is Expedition 16 Flight Engineer Daniel M. Tani. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Standing under space shuttle Discovery in Orbiter Processing Facility bay 3, from left, are Expedition 16 Flight Engineer Daniel M. Tani, Pilot George D. Zamka and Mission Specialist Paolo A. Nespoli, a European Space Agency astronaut from Italy. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. From left in blue flight suits, STS-120 Mission Specialist Douglas H. Wheelock, Commander Pamela A. Melroy and Mission Specialist Scott E. Parazynski receive instruction in Orbiter Processing Facility bay 3 on the operation of cameras that will fly on their mission. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
An Analysis of the Need for a Whole-Body CT Scanner at US Darnall Army Community Hospital
1980-05-01
TASK IWORK UNIT ELEMENT NO. I NO.JC NO. rSSION NO. Ij6T’,WAM ’"Aa1W% A WHOLE BODY CT SCANNER AT DARNALL ARMY COMUNITY HOSPITAL 16PTR3OAL tUTHOR(S)* a...computerized axial tomography or CT. Computerized tomography experiments "were conducted by Godfrey Hounsfield at Central Research Laboratories, EMI, Ltd. in...remained the same, with clinical and nursing unit facilities to support a one division post. Presently, Fort Hood is the home of the III US Army Corps, the
2010-06-01
scanners, readers, or imagers. These types of ADCS devices use two slightly different technologies. Laser scanners use a photodiode to measure the...structure of a ship, but the LCS utilizes modular mission packages that can be removed and replaced when the threat , environment, or mission changes...would need to support a wide array of business applications and users (Clarion, 2009). The DoD’s solution to this deficiency is called IUID. IUID is a
Progress toward a cosmic dust collection facility on space station
NASA Technical Reports Server (NTRS)
Mackinnon, Ian D. R. (Editor); Carey, William C. (Editor)
1987-01-01
Scientific and programmatic progress toward the development of a cosmic dust collection facility (CDCF) for the proposed space station is documented. Topics addressed include: trajectory sensor concepts; trajectory accuracy and orbital evolution; CDCF pointing direction; development of capture devices; analytical techniques; programmatic progress; flight opportunities; and facility development.
Status of the ATF Damping Ring BPM Upgrade Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Briegel, C.; /Fermilab; Eddy, N.
2011-12-01
A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it'smore » finalization are presented.« less
Supplementary steam - A viable hydrogen power generation concept
NASA Technical Reports Server (NTRS)
Wright, D. E.; Lee, J. C.
1979-01-01
Technical and economic aspects of a supplementary steam generation for peaking power applications are discussed. Preliminary designs of the hydrogen/oxygen combustors to be used for such applications are described. The integration of the hydrogen/oxygen steam-generating equipment into a typical coal-fired steam station is studied. The basic steam generation system was designed as a 20 MW supplementary system to be added to the existing 160 MW system. An analysis of the operating and design requirements of the supplementary system is conducted. Estimates were made for additional steam and fuel supply lines and for additional control required to operate the combustors and to integrate the combustor system into the facility.
47 CFR 73.3573 - Processing FM broadcast station applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 307(b) of the Communications Act of 1934, as amended (47 U.S.C. 307(b)); (2) The facilities... 47 Telecommunication 4 2011-10-01 2011-10-01 false Processing FM broadcast station applications... applications for licenses and all other changes in the facilities of authorized stations. (b)(1) The FCC may...
Sea Level Operation Demonstration of F404-GE-400 Turbofan Engine with JP-5/Bio-Fuel Mixture
2010-03-30
Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test consisted of two separate...turbofan engine inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test...turbofan engine (ESN 310810) inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station (NAS) Patuxent River, Maryland, on 13
ERIC Educational Resources Information Center
Farnsworth, Clayton
The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brunner, Claudia C.; Stern, Stanley H.; Chakrabarti, Kish
2013-08-15
Purpose: To measure radiation absorbed dose and its distribution in an anthropomorphic head phantom under clinically representative scan conditions in three widely used computed tomography (CT) scanners, and to relate those dose values to metrics such as high-contrast resolution, noise, and contrast-to-noise ratio (CNR) in the American College of Radiology CT accreditation phantom.Methods: By inserting optically stimulated luminescence dosimeters (OSLDs) in the head of an anthropomorphic phantom specially developed for CT dosimetry (University of Florida, Gainesville), we measured dose with three commonly used scanners (GE Discovery CT750 HD, Siemens Definition, Philips Brilliance 64) at two different clinical sites (Walter Reedmore » National Military Medical Center, National Institutes of Health). The scanners were set to operate with the same data-acquisition and image-reconstruction protocols as used clinically for typical head scans, respective of the practices of each facility for each scanner. We also analyzed images of the ACR CT accreditation phantom with the corresponding protocols. While the Siemens Definition and the Philips Brilliance protocols utilized only conventional, filtered back-projection (FBP) image-reconstruction methods, the GE Discovery also employed its particular version of an adaptive statistical iterative reconstruction (ASIR) algorithm that can be blended in desired proportions with the FBP algorithm. We did an objective image-metrics analysis evaluating the modulation transfer function (MTF), noise power spectrum (NPS), and CNR for images reconstructed with FBP. For images reconstructed with ASIR, we only analyzed the CNR, since MTF and NPS results are expected to depend on the object for iterative reconstruction algorithms.Results: The OSLD measurements showed that the Siemens Definition and the Philips Brilliance scanners (located at two different clinical facilities) yield average absorbed doses in tissue of 42.6 and 43.1 mGy, respectively. The GE Discovery delivers about the same amount of dose (43.7 mGy) when run under similar operating and image-reconstruction conditions, i.e., without tube current modulation and ASIR. The image-metrics analysis likewise showed that the MTF, NPS, and CNR associated with the reconstructed images are mutually comparable when the three scanners are run with similar settings, and differences can be attributed to different edge-enhancement properties of the applied reconstruction filters. Moreover, when the GE scanner was operated with the facility's scanner settings for routine head exams, which apply 50% ASIR and use only approximately half of the 100%-FBP dose, the CNR of the images showed no significant change. Even though the CNR alone is not sufficient to characterize the image quality and justify any dose reduction claims, it can be useful as a constancy test metric.Conclusions: This work presents a straightforward method to connect direct measurements of CT dose with objective image metrics such as high-contrast resolution, noise, and CNR. It demonstrates that OSLD measurements in an anthropomorphic head phantom allow a realistic and locally precise estimation of magnitude and spatial distribution of dose in tissue delivered during a typical CT head scan. Additional objective analysis of the images of the ACR accreditation phantom can be used to relate the measured doses to high contrast resolution, noise, and CNR.« less
PET and MRI: The Odd Couple or a Match Made in Heaven?
Catana, Ciprian; Guimaraes, Alexander R.; Rosen, Bruce R.
2013-01-01
Positron emission tomography (PET) and magnetic resonance imaging (MRI) are imaging modalities routinely used for clinical and research applications. Integrated scanners capable of acquiring PET and MRI data in the same imaging session, sequentially or simultaneously, have recently become available for human use. In this manuscript, we describe some of the technical advances that allowed the development of human PET/MR scanners, briefly discuss methodological challenges and opportunities provided by this novel technology and present potential oncologic, cardiac, and neuro-psychiatric applications. These examples range from studies that might immediately benefit from PET/MR to more advanced applications where future development might have an even broader impact. PMID:23492887
Cho, Jin-Hyung; Park, Wonse; Park, Kyeong-Mee; Kim, Seo-Yul
2017-01-01
Digital dentistry has influenced many dental procedures, such as three-dimensional (3D) diagnosis and treatment planning, surgical splints, and prosthetic treatments. Patient-specific protective appliances (PSPAs) prevent dental injury during endotracheal intubation. However, the required laboratory work takes time, and there is the possibility of tooth extraction while obtaining the dental impression. In this technical report, we utilized new digital technology for creating PSPAs, using direct intraoral scanners and 3D printers for dental cast fabrication. PMID:28879329
Cho, Jin-Hyung; Park, Wonse; Park, Kyeong-Mee; Kim, Seo-Yul; Kim, Kee-Deog
2017-03-01
Digital dentistry has influenced many dental procedures, such as three-dimensional (3D) diagnosis and treatment planning, surgical splints, and prosthetic treatments. Patient-specific protective appliances (PSPAs) prevent dental injury during endotracheal intubation. However, the required laboratory work takes time, and there is the possibility of tooth extraction while obtaining the dental impression. In this technical report, we utilized new digital technology for creating PSPAs, using direct intraoral scanners and 3D printers for dental cast fabrication.
Geyer, Lucas L; Körner, Markus; Harrieder, Andreas; Mueck, Fabian G; Deak, Zsuzsanna; Wirth, Stefan; Linsenmaier, Ulrich
2016-01-01
Evaluation of potential dose savings by implementing adaptive statistical iterative reconstruction (ASiR) on a gemstone-based scintillator in a clinical 64-row whole-body CT (WBCT) protocol after multiple trauma. Dose reports of 152 WBCT scans were analysed for two 64-row multidetector CT scanners (Scanners A and B); the main scanning parameters were kept constant. ASiR and a gemstone-based scintillator were used in Scanner B, and the noise index was adjusted (head: 5.2 vs 6.0; thorax/abdomen: 29.0 vs 46.0). The scan length, CT dose index (CTDI) and dose-length product (DLP) were analysed. The estimated mean effective dose was calculated using normalized conversion factors. Student's t-test was used for statistics. Both the mean CTDI (mGy) (Scanner A: 53.8 ± 2.0, 10.3 ± 2.5, 14.4 ± 3.7; Scanner B: 48.7 ± 2.2, 7.1 ± 2.3, 9.1 ± 3.6; p < 0.001, respectively) and the mean DLP (mGy cm) (Scanner A: 1318.9 ± 167.8, 509.3 ± 134.7, 848.8 ± 254.0; Scanner B: 1190.6 ± 172.6, 354.6 ± 128.3, 561.0 ± 246.7; p < 0.001, respectively) for the head, thorax and abdomen were significantly reduced with Scanner B. There was no relevant difference in scan length. The total mean effective dose (mSv) was significantly decreased with Scanner B (24.4 ± 6.0, 17.2 ± 5.8; p < 0.001). The implementation of ASiR and a gemstone-based scintillator allows for significant dose savings in a clinical WBCT protocol. Recent technical developments can significantly reduce radiation dose of WBCT in multiple trauma. Dose reductions of 10-34% can be achieved.
NASA Astrophysics Data System (ADS)
Danielson, L. R.; Draper, D. S.
2016-12-01
NASA Johnson Space Center's (JSC) Astromaterials Research and Exploration Science Division houses a unique combination of laboratories and other assets for conducting cutting-edge planetary research. These facilities have been accessed for decades by outside scientists; over the past five years, the 16 full time contract research and technical staff members in our division have hosted a total of 223 visiting researchers, representing 35 institutions. We intend to submit a proposal to NASA specifically for facilities support and establishment of our laboratories as a collective, PSAMS, Planetary Sample Analyses and Mission Science, which should result in substantial cost savings to PIs who wish to use our facilities. JSC is a recognized NASA center of excellence for curation, and in future will allow PIs easy access to samples in Curation facilities that they have been approved to study. Our curation expertise could also be used for a collection of experimental run products and standards that could be shared and distributed to community members, products that could range from 1 bar controlled atmosphere furnace, piston cylinder, multi-anvil, to shocked products. Coordinated analyses of samples is one of the major strengths of our division, where a single sample can be prepared with minimal destruction for a variety of chemical and structural analyses, from macro to nano-scale. A CT scanner will be delivered August 2016 and installed in the same building as all the other division experimental and analytical facilities, allowing users to construct a 3 dimensional model of their run product and/or starting material before any destruction of their sample for follow up analyses. The 3D printer may also be utilized to construct containers for diamond anvil cell experiments. Our staff scientists will work with PIs to maximize science return and serve the needs of the community. We welcome student visitors, and a graduate semester internship is available through Jacobs.
16 CFR 1402.4 - Requirements to provide performance and technical data by labeling and instructions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... technical data by labeling and instructions. 1402.4 Section 1402.4 Commercial Practices CONSUMER PRODUCT... instructions. (a) Notice to purchasers. Manufacturers of CB base station antennas, TV antennas, and antenna... Charts, which display the desired color within the tolerance limits. (ii) Instructions. CB base station...
NASA Astrophysics Data System (ADS)
Sheehan, Bryan G.
The purpose of this qualitative phenomenological study was to examine the phenomenon of enhanced, risk-based Federal Aviation Administration (FAA) oversight of Part 145 repair stations that performed aircraft maintenance for Part 121 air carriers between 2007 and 2014 in Oklahoma. Specifically, this research was utilized to explore what operational changes have occurred in the domestic Part 145 repair station industry such as variations in management or hiring practices, training, recordkeeping and technical data, inventory and aircraft parts supply-chain logistics, equipment, and facilities. After interviewing 12 managers from Part 145 repair stations in Oklahoma, six major theme codes emerged from the data: quality of oversight before 2007, quality of oversight after 2007, advantages of oversight, disadvantages of oversight, status quo of oversight, and process improvement . Of those six major theme codes, 17 subthemes appeared from the data that were used to explain the phenomenon of enhanced oversight in the Part 145 repair station industry. Forty-two percent of the participants indicated a weak FAA oversight system that has hindered the continuous process improvement program in their repair stations. Some of them were financially burdened after hiring additional full-time quality assurance inspectors to specifically manage enhanced FAA oversight. Notwithstanding, the participants of the study indicated that the FAA must apply its surveillance on a more standardized and consistent basis. They want to see this standardization in how FAA inspectors interpret regulations and practice the same quality of oversight for all repair stations, particularly those that are repeat violators and fail to comply with federal aviation regulations. They believed that when the FAA enforces standardization on a consistent basis, repair stations can become more efficient and safer in the performance of their scope of work for the U.S. commercial air transportation industry.
Airborne ultrasound applied to anthropometry--physical and technical principles.
Lindström, K; Mauritzson, L; Benoni, G; Willner, S
1983-01-01
Airborne ultrasound has been utilized for remote measurement of distance, direction, size, form, volume and velocity. General anthropometrical measurements are performed with a newly constructed real-time linear array scanner. To make full use of the method, we expect a rapid development of high-frequency ultrasound transducers for use in air.
The smartphone brain scanner: a portable real-time neuroimaging system.
Stopczynski, Arkadiusz; Stahlhut, Carsten; Larsen, Jakob Eg; Petersen, Michael Kai; Hansen, Lars Kai
2014-01-01
Combining low-cost wireless EEG sensors with smartphones offers novel opportunities for mobile brain imaging in an everyday context. Here we present the technical details and validation of a framework for building multi-platform, portable EEG applications with real-time 3D source reconstruction. The system--Smartphone Brain Scanner--combines an off-the-shelf neuroheadset or EEG cap with a smartphone or tablet, and as such represents the first fully portable system for real-time 3D EEG imaging. We discuss the benefits and challenges, including technical limitations as well as details of real-time reconstruction of 3D images of brain activity. We present examples of brain activity captured in a simple experiment involving imagined finger tapping, which shows that the acquired signal in a relevant brain region is similar to that obtained with standard EEG lab equipment. Although the quality of the signal in a mobile solution using an off-the-shelf consumer neuroheadset is lower than the signal obtained using high-density standard EEG equipment, we propose mobile application development may offset the disadvantages and provide completely new opportunities for neuroimaging in natural settings.
High-resolution ultrashort echo time (UTE) imaging on human knee with AWSOS sequence at 3.0 T.
Qian, Yongxian; Williams, Ashley A; Chu, Constance R; Boada, Fernando E
2012-01-01
To demonstrate the technical feasibility of high-resolution (0.28-0.14 mm) ultrashort echo time (UTE) imaging on human knee at 3T with the acquisition-weighted stack of spirals (AWSOS) sequence. Nine human subjects were scanned on a 3T MRI scanner with an 8-channel knee coil using the AWSOS sequence and isocenter positioning plus manual shimming. High-resolution UTE images were obtained on the subject knees at TE = 0.6 msec with total acquisition time of 5.12 minutes for 60 slices at an in-plane resolution of 0.28 mm and 10.24 minutes for 40 slices at an in-plane resolution of 0.14 mm. Isocenter positioning, manual shimming, and the 8-channel array coil helped minimize image distortion and achieve high signal-to-noise ratio (SNR). It is technically feasible on a clinical 3T MRI scanner to perform UTE imaging on human knee at very high spatial resolutions (0.28-0.14 mm) within reasonable scan time (5-10 min) using the AWSOS sequence. Copyright © 2011 Wiley Periodicals, Inc.
ERIC Educational Resources Information Center
Kaplan, Eugene H.
1980-01-01
Listed are field stations in the Caribbean and Florida-Bahamas which are suitable for classes in field geology and tropical marine science. Each field station is described by listing the name of the institution, description of accommodations, library facilities, laboratory facilities, boats, classrooms, motor vehicles, study areas, scuba, and…
55. View from ground level in building no. 105 showing ...
55. View from ground level in building no. 105 showing lower radar scanner switch with eighty-eight 1-1/2" diameter copper ion return RF balance tube systems. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
48. View of typical 90 degree elbow located at horizontal ...
48. View of typical 90 degree elbow located at horizontal corner with output (to scanner radar system control switch) waveguide on top and return wave on bottom of photograph. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
International Space Station Medical Projects - Full Services to Mars
NASA Technical Reports Server (NTRS)
Pietrzyk, R. A.; Primeaux, L. L.; Wood, S. J.; Vessay, W. B.; Platts, S. H.
2018-01-01
The International Space Station Medical Projects (ISSMP) Element provides planning, integration, and implementation services for HRP research studies for both spaceflight and flight analog research. Through the implementation of these two efforts, ISSMP offers an innovative way of guiding research decisions to meet the unique challenges of understanding the human risks to space exploration. Flight services provided by ISSMP include leading informed consent briefings, developing and validating in-flight crew procedures, providing ISS crew and ground-controller training, real-time experiment monitoring, on-orbit experiment and hardware operations and facilitating data transfer to investigators. For analog studies at the NASA Human Exploration Research Analog (HERA), the ISSMP team provides subject recruitment and screening, science requirements integration, data collection schedules, data sharing agreements, mission scenarios and facilities to support investigators. The ISSMP also serves as the HRP interface to external analog providers including the :envihab bed rest facility (Cologne, Germany), NEK isolation chamber (Moscow, Russia) and the Antarctica research stations. Investigators working in either spaceflight or analog environments requires a coordinated effort between NASA and the investigators. The interdisciplinary nature of both flight and analog research requires investigators to be aware of concurrent research studies and take into account potential confounding factors that may impact their research objectives. Investigators must define clear research requirements, participate in Investigator Working Group meetings, obtain human use approvals, and provide study-specific training, sample and data collection and procedures all while adhering to schedule deadlines. These science requirements define the technical, functional and performance operations to meet the research objectives. The ISSMP maintains an expert team of professionals with the knowledge and experience to guide investigators science through all aspects of mission planning, crew operations, and research integration. During this session, the ISSMP team will discuss best-practices approaches for successfully preparing and conducting studies in both the flight and analog environments. Critical tips and tricks will be shown to greatly improve your chances of successfully completing your research aboard the International Space Station and in Spaceflight Analogs.
NASA Astrophysics Data System (ADS)
Redshaw, M.; Barquest, B. R.; Bollen, G.; Bustabad, S. E.; Campbell, C. M.; Ferrer, R.; Gehring, A.; Kwiatkowski, A. A.; Lincoln, D. L.; Morrissey, D. J.; Pang, G. K.; Ringle, R.; Schwarz, S.
2011-07-01
The LEBIT (Low Energy Beam and Ion Trap) facility is the only Penning trap mass spectrometry (PTMS) facility to utilize rare isotopes produced via fast-beam fragmentation. This technique allows access to practically all elements lighter than uranium, and in particular enables the production of isotopes that are not available or that are difficult to obtain at isotope separation on-line facilities. The preparation of the high-energy rare-isotope beam produced by projectile fragmentation for low-energy PTMS experiments is achieved by gas stopping to slow down and thermalize the fast-beam ions, along with an rf quadrupole cooler and buncher and rf quadrupole ion guides to deliver the beam to the Penning trap. During its first phase of operation LEBIT has been very successful, and new developments are now underway to access rare isotopes even farther from stability, which requires dealing with extremely short lifetimes and low production rates. These developments aim at increasing delivery efficiency, minimizing delivery and measurement time, and maximizing use of available beam time. They include an upgrade to the gas-stopping station, active magnetic field monitoring and stabilization by employing a miniature Penning trap as a magnetometer, the use of stored waveform inverse Fourier transform (SWIFT) to most effectively remove unwanted ions, and charge breeding.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Housing, Facilities, Equipment, Materials, and Data § 145.101 General. A certificated repair station must provide housing, facilities, equipment, materials, and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Housing, Facilities, Equipment, Materials, and Data § 145.101 General. A certificated repair station must provide housing, facilities, equipment, materials, and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Housing, Facilities, Equipment, Materials, and Data § 145.101 General. A certificated repair station must provide housing, facilities, equipment, materials, and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Housing, Facilities, Equipment, Materials, and Data § 145.101 General. A certificated repair station must provide housing, facilities, equipment, materials, and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Housing, Facilities, Equipment, Materials, and Data § 145.101 General. A certificated repair station must provide housing, facilities, equipment, materials, and...
Code of Federal Regulations, 2012 CFR
2012-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2013 CFR
2013-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Code of Federal Regulations, 2014 CFR
2014-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Planning for the scientific use of the international Space Station complex
NASA Technical Reports Server (NTRS)
Halpern, R. E.
1988-01-01
Plans for the development of an international Space Station complex in cooperation with Japan, Canada, and the European Space Agency are reviewed. The discussion covers the planned uses of the Space Station, the principal research facilities, allocation of the resources available to the research facilities, and tactical and strategic planning related to the Space Station project. Particular attention is given to problems related to microgravity sciences and approaches to the solutions of these problems.
Assembling, maintaining and servicing Space Station
NASA Technical Reports Server (NTRS)
Doetsch, K. H.; Werstiuk, H.; Creasy, W.; Browning, R.
1987-01-01
The assembly, maintenance, and servicing of the Space Station and its facilities are discussed. The tools and facilities required for the assembly, maintenance, and servicing of the Station are described; the ground and transportation infrastructures needed for the Space Station are examined. The roles of automation and robotics in reducing the EVAs of the crew, minimizing disturbances to the Space Station environment, and enhancing user friendliness are investigated. Servicing/maintenance tasks are categorized based on: (1) urgency, (2) location of servicing/maintenance, (3) environmental control, (4) dexterity, (5) transportation, (6) crew interactions, (7) equipment interactions, and (8) Space Station servicing architecture. An example of a servicing mission by the Space Station for the Hubble Space Telescope is presented.
NASA Technical Reports Server (NTRS)
2004-01-01
Beginning with the Apollo Program in the early 1960s, the NASA White Sands Test Facility (WSTF) has supported every U.S. human exploration space flight program to date. Located in Las Cruces, New Mexico, WSTF is part of Johnson Space Center. The facility's primary mission is to provide the expertise and infrastructure to test and evaluate spacecraft materials, components, and rocket propulsion systems to enable the safe human exploration and utilization of space. WSTF stores, tests, and disposes of Space Shuttle and International Space Station propellants. Since aerospace fluids can have harmful reactions with the construction materials of the systems containing them, a major component of WSTF's work is the study of propellants and hazardous materials. WSTF has a wide variety of resources to draw upon in assessing the fire, explosion, compatibility, and safety hazards of these fluids, which include hydrogen, oxygen, hydrazine fuels, and nitrogen tetroxide. In addition to developing new test methods, WSTF has created technical manuals and training courses for the safe use of aerospace fluids.
Prefocal station mechanical design concept study for the E-ELT
NASA Astrophysics Data System (ADS)
Jolley, Paul; Brunetto, Enzo; Frank, Christoph; Lewis, Steffan; Marchetti, Enrico
2016-07-01
The Nasmyth platforms of the E-ELT will contain one Prefocal Station (PFS) each. The main PFS functional requirements are to provide a focal plane to the three Nasmyth focal stations and the Coudé focus, optical sensing supporting telescope low order optimisation and seeing limited image quality, and optical sensing supporting characterising and phasing of M1 and other telescope subsystems. The PFS user requirements are used to derive the PFS technical requirements specification that will form the basis for design, development and production of the system. This specification process includes high-level architectural decisions and technical performance budget allocations. The mechanical design concepts reported here have been developed in order to validate key system specifications and associated technical budgets.
ERIC Educational Resources Information Center
Garcia, Lilia
2000-01-01
While arts facilities should be equipped with computers, color scanners, MIDI (Musical Instrument Digital Interface) labs, connective video cameras, and appropriate software, music rooms still need pianos and visual art rooms need traditional art supplies. Dade County (Florida) Schools's pilot teacher assistance projects and arts-centered schools…
Fiber optic video monitoring system for remote CT/MR scanners clinically accepted
NASA Astrophysics Data System (ADS)
Tecotzky, Raymond H.; Bazzill, Todd M.; Eldredge, Sandra L.; Tagawa, James; Sayre, James W.
1992-07-01
With the proliferation of CT travel to distant scanners to review images before their patients can be released. We designed a fiber-optic broadband video system to transmit images from seven scanner consoles to fourteen remote monitoring stations in real time. This system has been used clinically by radiologists for over one years. We designed and conducted a user survey to categorize the levels of system use by section (Chest, GI, GU, Bone, Neuro, Peds, etc.), to measure operational utilization and acceptance of the system into the clinical environment, to clarify the system''s importance as a clinical tool for saving radiologists travel-time to distant CT the system''s performance and limitations as a diagnostic tool. The study was administered directly to radiologists using a printed survey form. The results of the survey''s compiled data show a high percentage of system usage by a wide spectrum of radiologists. Clearly, this system has been accepted into the clinical environment as a highly valued diagnostic tool in terms of time savings and functional flexibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the location of the base station transmitter site of the facility for which they have applied. (2... licensed to them within 64 km (40 mi.) from the location of the base station transmitter site of the... control stations to be placed in operation within the term of the license. (c) [Reserved] (d) All...
Using space for technology development - Planning for the Space Station era
NASA Technical Reports Server (NTRS)
Ambrus, Judith H.; Couch, Lana M.; Rosen, Robert R.; Gartrell, Charles F.
1989-01-01
Experience with the Shuttle and free-flying satellites as technology test-beds has shown the feasibility and desirability of using space assets as a facility for technology development. Thus, by the time the Space Station era will have arrived, the technologist will be ready for an accessible engineering facility in space. As the 21st century is approached, it is expected that virtually every flight to the Space Station Freedom will be required to carry one or more research, technology, and engineering experiments. The experiments planned will utilize both the pressurized volume, and the external payload attachment facilities. A unique, but extremely important, class of experiments will use the Space Station itself as an experimental vehicle. Based upon recent examination of possible Space Station Freedom assembly sequences, technology payloads may well utilize 20-30 percent of available resources.
An automated geometric correction system for airborne multispectral scanner imagery
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis-King, E.; Tinney, L.; Brickey, D.
1996-10-01
The United States Department of Energy (USDOE) maintains a Remote Sensing Laboratory (RSL) to support nuclear related programs of the US Government. The mission of the organization includes both emergency response and more routine environmental assessments of nuclear facilities. The USDOE RSL maintains a small fleet of specially equipped aircraft that are used as platforms for remote sensor systems. The aircraft include helicopters, light aircraft, and a business jet suitable for high altitude acquisitions. Multispectral scanners flown on these platforms are subject to geometric distortions related to variations in aircraft orientation (pitch, roll, and yaw), position, and velocity during datamore » acquistions.« less
A microprocessor controlled pressure scanning system
NASA Technical Reports Server (NTRS)
Anderson, R. C.
1976-01-01
A microprocessor-based controller and data logger for pressure scanning systems is described. The microcomputer positions and manages data from as many as four 48-port electro-mechanical pressure scanners. The maximum scanning rate is 80 pressure measurements per second (20 ports per second on each of four scanners). The system features on-line calibration, position-directed data storage, and once-per-scan display in engineering units of data from a selected port. The system is designed to be interfaced to a facility computer through a shared memory. System hardware and software are described. Factors affecting measurement error in this type of system are also discussed.
Technical Subjects. Mathematics. Science. Curriculum RP-27.
ERIC Educational Resources Information Center
Ontario Dept. of Education, Toronto.
GRADES OR AGES: Grades 9-12. SUBJECT MATTER: Technical subjects and special mathematics and science courses for technical students. Technical subjects include air conditioning, auto mechanics, carpentry, drafting, applied electronics, masonry, painting, plumbing, service station operation, welding, and woodworking. ORGANIZATION AND PHYSICAL…
DOT National Transportation Integrated Search
2005-07-01
The primary purpose of Pedestrian and Bicycle Facilities in CaliforniaA : Technical Reference and Technology Transfer Synthesis for Caltrans Planners : and Engineers (Technical Reference) is to provide Caltrans staff : with a synthesis of in...
2006-06-01
KENNEDY SPACE CENTER, FLA. - Inside the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane settles the Columbus module onto a work stand. Columbus is the European Space Agency's research laboratory for the International Space Station. The module will be prepared for delivery to the space station on a future space shuttle mission. Columbus will expand the research facilities of the station and provide researchers with the ability to conduct numerous experiments in the area of life, physical and materials sciences. Photo credit: NASA/Jim Grossmann
2006-06-01
KENNEDY SPACE CENTER, FLA. - Inside the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane lowers the Columbus module toward a work stand. Columbus is the European Space Agency's research laboratory for the International Space Station. The module will be prepared for delivery to the space station on a future space shuttle mission. Columbus will expand the research facilities of the station and provide researchers with the ability to conduct numerous experiments in the area of life, physical and materials sciences. Photo credit: NASA/Jim Grossmann
Unity connecting module in the Space Station Processing Facility
NASA Technical Reports Server (NTRS)
1998-01-01
Unity connecting module, part of the International Space Station, awaits processing in the Space Station Processing Facility (SSPF). On the end at the right can be seen the Pressurized Mating Adapter 2, which provides entry into the module. The Unity, scheduled to be launched on STS-88 in December 1998, will be mated to the Russian-built Zarya control module which will already be in orbit. STS-88 will be the first Space Shuttle launch for the International Space Station.
2003-06-12
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Executive Director of NASDA Koji Yamamoto (center) joins others for a tour. Mr. Yamamoto is at KSC for a welcome ceremony involving the arrival of the newest Space Station module, the Japanese Experiment Module/pressurized module.
2003-06-12
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Executive Director of NASDA Koji Yamamoto points to other Space Station elements. Behind him is the Japanese Experiment Module (JEM)/pressurized module. Mr. Yamamoto is at KSC for a welcome ceremony involving the arrival of JEM.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Azar, Miguel; Gardner, Donald A.; Taylor, Edward R.
Exelon Nuclear (Exelon) designed and constructed an Interim Radwaste Storage Facility (IRSF) in the mid-1980's at LaSalle County Nuclear Station (LaSalle). The facility was designed to store low-level radioactive waste (LLRW) on an interim basis, i.e., up to five years. The primary reason for the IRSF was to offset lack of disposal in case existing disposal facilities, such as the Southeast Compact's Barnwell Disposal Facility in Barnwell, South Carolina, ceased accepting radioactive waste from utilities not in the Southeast Compact. Approximately ninety percent of the Radwaste projected to be stored in the LaSalle IRSF in that period of time wasmore » Class A, with the balance being Class B/C waste. On July 1, 2008 the Barnwell Disposal Facility in the Southeast Compact closed its doors to out of- compact Radwaste, which precluded LaSalle from shipping Class B/C Radwaste to an outside disposal facility. Class A waste generated by LaSalle is still able to be disposed at the 'Envirocare of Utah LLRW Disposal Complex' in Clive, Utah. Thus the need for utilizing the LaSalle IRSF for storing Class B/C Radwaste for an extended period, perhaps life-of-plant or more became apparent. Additionally, other Exelon Midwest nuclear stations located in Illinois that did not build an IRSF heretofore also needed extended Radwaste storage. In early 2009, Exelon made a decision to forward Radwaste from the Byron Nuclear Station (Byron), Braidwood Nuclear Station (Braidwood), and Clinton Nuclear Station (Clinton) to LaSalle's IRSF. As only Class B/C Radwaste would need to be forwarded to LaSalle, the original volumetric capacity of the LaSalle IRSF was capable of handling the small number of additional expected shipments annually from the Exelon sister nuclear stations in Illinois. Forwarding Class B/C Radwaste from the Exelon sister nuclear stations in Illinois to LaSalle would require an amendment to the LaSalle Station operating license. Exelon submitted the License Amendment Request (LAR) to NRC on January 6, 2010; NRC approved the LAR on July 21, 2011. A similar decision was made by Exelon in early 2009 to forward Radwaste from Limerick Nuclear Station to its sister station, the Peach Bottom Atomic Power Station; both in Pennsylvania. A LAR submittal to the NRC was also provided and NRC approval was received in 2011. (authors)« less
Bragança, Sara; Arezes, Pedro; Carvalho, Miguel; Ashdown, Susan P; Castellucci, Ignacio; Leão, Celina
2018-01-01
Collecting anthropometric data for real-life applications demands a high degree of precision and reliability. It is important to test new equipment that will be used for data collectionOBJECTIVE:Compare two anthropometric data gathering techniques - manual methods and a Kinect-based 3D body scanner - to understand which of them gives more precise and reliable results. The data was collected using a measuring tape and a Kinect-based 3D body scanner. It was evaluated in terms of precision by considering the regular and relative Technical Error of Measurement and in terms of reliability by using the Intraclass Correlation Coefficient, Reliability Coefficient, Standard Error of Measurement and Coefficient of Variation. The results obtained showed that both methods presented better results for reliability than for precision. Both methods showed relatively good results for these two variables, however, manual methods had better results for some body measurements. Despite being considered sufficiently precise and reliable for certain applications (e.g. apparel industry), the 3D scanner tested showed, for almost every anthropometric measurement, a different result than the manual technique. Many companies design their products based on data obtained from 3D scanners, hence, understanding the precision and reliability of the equipment used is essential to obtain feasible results.
Space station automation study. Volume 1: Executive summary. Autonomous systems and assembly
NASA Technical Reports Server (NTRS)
1984-01-01
The purpose of the Space Station Automation Study (SSAS) was to develop informed technical guidance for NASA personnel in the use of autonomy and autonomous systems to implement space station functions.
CT protocol management: simplifying the process by using a master protocol concept.
Szczykutowicz, Timothy P; Bour, Robert K; Rubert, Nicholas; Wendt, Gary; Pozniak, Myron; Ranallo, Frank N
2015-07-08
This article explains a method for creating CT protocols for a wide range of patient body sizes and clinical indications, using detailed tube current information from a small set of commonly used protocols. Analytical expressions were created relating CT technical acquisition parameters which can be used to create new CT protocols on a given scanner or customize protocols from one scanner to another. Plots of mA as a function of patient size for specific anatomical regions were generated and used to identify the tube output needs for patients as a function of size for a single master protocol. Tube output data were obtained from the DICOM header of clinical images from our PACS and patient size was measured from CT localizer radiographs under IRB approval. This master protocol was then used to create 11 additional master protocols. The 12 master protocols were further combined to create 39 single and multiphase clinical protocols. Radiologist acceptance rate of exams scanned using the clinical protocols was monitored for 12,857 patients to analyze the effectiveness of the presented protocol management methods using a two-tailed Fisher's exact test. A single routine adult abdominal protocol was used as the master protocol to create 11 additional master abdominal protocols of varying dose and beam energy. Situations in which the maximum tube current would have been exceeded are presented, and the trade-offs between increasing the effective tube output via 1) decreasing pitch, 2) increasing the scan time, or 3) increasing the kV are discussed. Out of 12 master protocols customized across three different scanners, only one had a statistically significant acceptance rate that differed from the scanner it was customized from. The difference, however, was only 1% and was judged to be negligible. All other master protocols differed in acceptance rate insignificantly between scanners. The methodology described in this paper allows a small set of master protocols to be adapted among different clinical indications on a single scanner and among different CT scanners.
Fifth anniversary of the first element of the International Spac
2003-12-03
In the Space Station Processing Facility (SSPF), Charles J. Precourt, deputy manager of NASA's International Space Station Program, is interviewed by a reporter from a local television station. Representatives from the media were invited to commemorate the fifth anniversary of the launch of the first element of the Station with a tour of the facility and had the opportunity to see Space Station hardware that is being processed for deployment once the Space Shuttles return to flight. NASA and Boeing mission managers were on hand to talk about the various hardware elements currently being processed for flight.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tsai, H. Y.; Tung, C. J.; Yu, C. C.
2007-04-15
The IAEA and the ICRP recommended dose guidance levels for the most frequent computed tomography (CT) examinations to promote strategies for the optimization of radiation dose to CT patients. A national survey, including on-site measurements and questionnaires, was conducted in Taiwan in order to establish dose guidance levels and evaluate effective doses for CT. The beam quality and output and the phantom doses were measured for nine representative CT scanners. Questionnaire forms were completed by respondents from facilities of 146 CT scanners out of 285 total scanners. Information on patient, procedure, scanner, and technique for the head and body examinationsmore » was provided. The weighted computed tomography dose index (CTDI{sub w}), the dose length product (DLP), organ doses and effective dose were calculated using measured data, questionnaire information and Monte Carlo simulation results. A cost-effective analysis was applied to derive the dose guidance levels on CTDI{sub w} and DLP for several CT examinations. The mean effective dose{+-}standard deviation distributes from 1.6{+-}0.9 mSv for the routine head examination to 13{+-}11 mSv for the examination of liver, spleen, and pancreas. The surveyed results and the dose guidance levels were provided to the national authorities to develop quality control standards and protocols for CT examinations.« less
NASA Astrophysics Data System (ADS)
Dunham, G.; Harding, E. C.; Loisel, G. P.; Lake, P. W.; Nielsen-Weber, L. B.
2016-11-01
Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity applied to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunham, G., E-mail: gsdunha@sandia.gov; Harding, E. C.; Loisel, G. P.
Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity appliedmore » to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.« less
2006-02-01
WHOI- 2006 -06 Woods Hole Oceanographic Institution 1930 Stratus Ocean Reference Station (20°S, 85°W) Mooring Recovery and Deployment Cruise RN Ronald...Environmental Technology Laboratory, 3University of Colorado, CIRES, 4University of Miami, 5University of Concepcion February 2006 Technical Report...Institution Woods Hole, MA 02543 UOP Technical Report 2006 -01 WHOI- 2006 -06 UOP- 2006 -01 Stratus Ocean Reference Station (20*S, 85*W) Mooring Recovery and
Large Deployable Reflector (LDR) Requirements for Space Station Accommodations
NASA Technical Reports Server (NTRS)
Crowe, D. A.; Clayton, M. J.; Runge, F. C.
1985-01-01
Top level requirements for assembly and integration of the Large Deployable Reflector (LDR) Observatory at the Space Station are examined. Concepts are currently under study for LDR which will provide a sequel to the Infrared Astronomy Satellite and the Space Infrared Telescope Facility. LDR will provide a spectacular capability over a very broad spectral range. The Space Station will provide an essential facility for the initial assembly and check out of LDR, as well as a necessary base for refurbishment, repair and modification. By providing a manned platform, the Space Station will remove the time constraint on assembly associated with use of the Shuttle alone. Personnel safety during necessary EVA is enhanced by the presence of the manned facility.
Large Deployable Reflector (LDR) requirements for space station accommodations
NASA Astrophysics Data System (ADS)
Crowe, D. A.; Clayton, M. J.; Runge, F. C.
1985-04-01
Top level requirements for assembly and integration of the Large Deployable Reflector (LDR) Observatory at the Space Station are examined. Concepts are currently under study for LDR which will provide a sequel to the Infrared Astronomy Satellite and the Space Infrared Telescope Facility. LDR will provide a spectacular capability over a very broad spectral range. The Space Station will provide an essential facility for the initial assembly and check out of LDR, as well as a necessary base for refurbishment, repair and modification. By providing a manned platform, the Space Station will remove the time constraint on assembly associated with use of the Shuttle alone. Personnel safety during necessary EVA is enhanced by the presence of the manned facility.
The partnership: Space shuttle, space science, and space station
NASA Technical Reports Server (NTRS)
Culbertson, Philip E.; Freitag, Robert F.
1989-01-01
An overview of the NASA Space Station Program functions, design, and planned implementation is presented. The discussed functions for the permanently manned space facility include: (1) development of new technologies and related commercial products; (2) observations of the Earth and the universe; (3) provision of service facilities for resupply, maintenance, upgrade and repair of payloads and spacecraft; (4) provision of a transportation node for stationing, processing and dispatching payloads and vehicles; (5) provision of manufacturing and assembly facilities; (6) provision of a storage depot for parts and payloads; and (7) provision of a staging base for future space endeavors. The fundamental concept for the Space Station, as given, is that it be designed, operated, and evolved in response to a broad variety of scientific, technological, and commercial user interests. The Space Shuttle's role as the principal transportation system for the construction and maintenance of the Space Station and the servicing and support of the station crew is also discussed.
Node 2 and Japanese Experimental Module (JEM) In Space Station Processing Facility
NASA Technical Reports Server (NTRS)
2003-01-01
Lining the walls of the Space Station Processing Facility at the Kennedy Space Center (KSC) are the launch awaiting U.S. Node 2 (lower left). and the first pressurized module of the Japanese Experimental Module (JEM) (upper right), named 'Kibo' (Hope). Node 2, the 'utility hub' and second of three connectors between International Space Station (ISS) modules, was built in the Torino, Italy facility of Alenia Spazio, an International contractor based in Rome. Japan's major contribution to the station, the JEM, was built by the Space Development Agency of Japan (NASDA) at the Tsukuba Space Center near Tokyo and will expand research capabilities aboard the station. Both were part of an agreement between NASA and the European Space Agency (ESA). The Node 2 will be the next pressurized module installed on the Station. Once the Japanese and European laboratories are attached to it, the resulting roomier Station will expand from the equivalent space of a 3-bedroom house to a 5-bedroom house. The Marshall Space Center in Huntsville, Alabama manages the Node program for NASA.
Panaccione, G; Vobornik, I; Fujii, J; Krizmancic, D; Annese, E; Giovanelli, L; Maccherozzi, F; Salvador, F; De Luisa, A; Benedetti, D; Gruden, A; Bertoch, P; Polack, F; Cocco, D; Sostero, G; Diviacco, B; Hochstrasser, M; Maier, U; Pescia, D; Back, C H; Greber, T; Osterwalder, J; Galaktionov, M; Sancrotti, M; Rossi, G
2009-04-01
We report the main characteristics of the advanced photoelectric effect experiments beamline, operational at Elettra storage ring, featuring a fully independent double branch scheme obtained by the use of chicane undulators and able to keep polarization control in both linear and circular mode. The paper describes the novel technical solutions adopted, namely, (a) the design of a quasiperiodic undulator resulting in optimized suppression of higher harmonics over a large photon energy range (10-100 eV), (b) the thermal stability of optics under high heat load via cryocoolers, and (c) the end station interconnected setup allowing full access to off-beam and on-beam facilities and, at the same time, the integration of users' specialized sample growth chambers or modules.
NASA Astrophysics Data System (ADS)
White, W. H.; Farber, R. J.; Malm, W. C.; Nuttall, M.; Pitchford, M. L.; Schichtel, B. A.
2012-08-01
Few electricity generating stations received more environmental scrutiny during the last quarter of the twentieth century than did the Mohave Power Project (MPP), a coal-fired facility near Grand Canyon National Park. Terhorst and Berkman (2010) examine regional aerosol monitoring data collected before and after the plant's 2006 retirement for retrospective evidence of MPP's impact on visibility in the Park. The authors' technical analysis is thoughtfully conceived and executed, but is misleadingly presented as discrediting previous studies and their interpretation by regulators. In reality the Terhorst-Berkman analysis validates a consensus on MPP's visibility impact that was established years before its closure, in a collaborative assessment undertaken jointly by Federal regulators and MPP's owners.
International Space Station Lithium-Ion Main Battery Thermal Runaway Propagation Test
NASA Technical Reports Server (NTRS)
Dalton, Penni J.; North, Tim
2017-01-01
In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the aging Ni-H2 batteries on the primary Electric Power System (EPS). After the Boeing 787 Li-Ion battery fires, the NASA Engineering and Safety Center (NESC) Power Technical Discipline Team was tasked by ISS to investigate the possibility of Thermal Runaway Propagation (TRP) in all Li-Ion batteries used on the ISS. As part of that investigation, NESC funded a TRP test of an ISS EPS non-flight Li-Ion battery. The test was performed at NASA White Sands Test Facility in October 2016. This paper will discuss the work leading up to the test, the design of the test article, and the test results.
77 FR 55837 - Information Collection Being Reviewed by the Federal Communications Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
..., Satellite Network Stations and Space Stations. Form No.: FCC Form 312; Schedule S. Type of Review: Extension... determine the technical and legal qualifications of applicants or licensees to operate a station, transfer...
Maurer, Christian; Baré, Jonathan; Kusmierczyk-Michulec, Jolanta; ...
2018-03-08
After performing a first multi-model exercise in 2015 a comprehensive and technically more demanding atmospheric transport modelling challenge was organized in 2016. Release data were provided by the Australian Nuclear Science and Technology Organization radiopharmaceutical facility in Sydney (Australia) for a one month period. Measured samples for the same time frame were gathered from six International Monitoring System stations in the Southern Hemisphere with distances to the source ranging between 680 (Melbourne) and about 17,000 km (Tristan da Cunha). Participants were prompted to work with unit emissions in pre-defined emission intervals (daily, half-daily, 3-hourly and hourly emission segment lengths) andmore » in order to perform a blind test actual emission values were not provided to them. Despite the quite different settings of the two atmospheric transport modelling challenges there is common evidence that for long-range atmospheric transport using temporally highly resolved emissions and highly space-resolved meteorological input fields has no significant advantage compared to using lower resolved ones. As well an uncertainty of up to 20% in the daily stack emission data turns out to be acceptable for the purpose of a study like this. Model performance at individual stations is quite diverse depending largely on successfully capturing boundary layer processes. No single model-meteorology combination performs best for all stations. Moreover, the stations statistics do not depend on the distance between the source and the individual stations. Finally, it became more evident how future exercises need to be designed. Set-up parameters like the meteorological driver or the output grid resolution should be pre-scribed in order to enhance diversity as well as comparability among model runs.« less
Biomass power for rural development. Technical progress report, July 1--September 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the third quarter of 1997, much of the Consortium`s effort has focused on outreach activities, continued feedstock development, fuel supply planning, and fuel contract development, and preparation for 1998 scale-up activities. The Consortium also submitted a Phase-1 extension proposal during this period. A few of the more important milestones are outlined below. The fourth quarter of 1997 is expected to be dominated by Phase-II proposal efforts and planning for 1998 activities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maurer, Christian; Baré, Jonathan; Kusmierczyk-Michulec, Jolanta
After performing a first multi-model exercise in 2015 a comprehensive and technically more demanding atmospheric transport modelling challenge was organized in 2016. Release data were provided by the Australian Nuclear Science and Technology Organization radiopharmaceutical facility in Sydney (Australia) for a one month period. Measured samples for the same time frame were gathered from six International Monitoring System stations in the Southern Hemisphere with distances to the source ranging between 680 (Melbourne) and about 17,000 km (Tristan da Cunha). Participants were prompted to work with unit emissions in pre-defined emission intervals (daily, half-daily, 3-hourly and hourly emission segment lengths) andmore » in order to perform a blind test actual emission values were not provided to them. Despite the quite different settings of the two atmospheric transport modelling challenges there is common evidence that for long-range atmospheric transport using temporally highly resolved emissions and highly space-resolved meteorological input fields has no significant advantage compared to using lower resolved ones. As well an uncertainty of up to 20% in the daily stack emission data turns out to be acceptable for the purpose of a study like this. Model performance at individual stations is quite diverse depending largely on successfully capturing boundary layer processes. No single model-meteorology combination performs best for all stations. Moreover, the stations statistics do not depend on the distance between the source and the individual stations. Finally, it became more evident how future exercises need to be designed. Set-up parameters like the meteorological driver or the output grid resolution should be pre-scribed in order to enhance diversity as well as comparability among model runs.« less
NASA Technical Reports Server (NTRS)
Hozman, Aron D.; Hughes, William O.; McNelis, Mark E.; McNelis, Anne M.
2011-01-01
The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA's space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 cu ft in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world's known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada's acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.
Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2
NASA Technical Reports Server (NTRS)
Perkey, John K.
1992-01-01
The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.
47 CFR 95.129 - Station equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SERVICES General Mobile Radio Service (GMRS) § 95.129 Station equipment. Every station in a GMRS system... find out if a particular transmitter has been certificated for the GMRS. All station equipment in a GMRS system must comply with the technical rules in part 95. [63 FR 68975, Dec. 14, 1998] ...
47 CFR 78.109 - Major and minor modifications to stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Major and minor modifications to stations. 78... SERVICES CABLE TELEVISION RELAY SERVICE Technical Regulations § 78.109 Major and minor modifications to stations. (a) Amendments to applications and modifications to stations are classified as major or minor. A...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
Tethered orbital propellant depot
NASA Technical Reports Server (NTRS)
Fester, D. A.; Rudolph, L. K.; Kiefel, E. R.
1985-01-01
A planned function of the Space Station is to refurbish and refuel an advanced space-based LO2/LH2 orbit transfer vehicle. An alternative to propellant storage at the station is to use a remote facility tied to the station with a log tether. Preliminary design of such a facility is described with emphasis on fluid transfer and storage requirements. Using tether lengths of at least 300 ft, gravity gradient forces will dominate surface tension in such a system. Although gravity given transfer is difficult because of line pressure drops, fluid settling over the tank outlet greatly alleviates acquisition concerns and will facilitate vented tank fills. The major concern with a tethered orbital refueling facility is its considerable operational complexity including transport of the OTV to and from the facility.
Survey of aircraft icing simulation test facilities in North America
NASA Technical Reports Server (NTRS)
Olsen, W.
1981-01-01
A survey was made of the aircraft icing simulation facilities in North America: there are 12 wind tunnels, 28 engine test facilities, 6 aircraft tankers and 14 low velocity facilities, that perform aircraft icing tests full or part time. The location and size of the facility, its speed and temperature range, icing cloud parameters, and the technical person to contact are surveyed. Results are presented in tabular form. The capabilities of each facility were estimated by its technical contact person. The adequacy of these facilities for various types of icing tests is discussed.
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
48 CFR 811.107 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facility unless the facility Chief, Engineering Service, indicates that the service data manuals are not... mechanical equipment (other than technical medical and other technical equipment and devices) issued by a...
44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.
Code of Federal Regulations, 2011 CFR
2011-10-01
... assistance and Federal facilities and resources. 352.24 Section 352.24 Emergency Management and Assistance... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f) and...
Kennedy Space Center Launch and Landing Support
NASA Technical Reports Server (NTRS)
Wahlberg, Jennifer
2010-01-01
The presentations describes Kennedy Space Center (KSC) payload processing, facilities and capabilities, and research development and life science experience. Topics include launch site processing, payload processing, key launch site processing roles, leveraging KSC experience, Space Station Processing Facility and capabilities, Baseline Data Collection Facility, Space Life Sciences Laboratory and capabilities, research payload development, International Space Station research flight hardware, KSC flight payload history, and KSC life science expertise.
49 CFR 374.309 - Terminal facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Passenger security. All terminals and stations must provide adequate security for passengers and their attendants and be regularly patrolled. (b) Outside facilities. At terminals and stations that are closed when... accommodations, and telephone numbers for local taxi service and police. (c) Maintenance. Terminals shall be...
78 FR 55075 - Radio Broadcasting Services; AM or FM Proposals To Change the Community of License
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-09
...., Station NEW, Facility ID 191511, BNPH- 20130724AGJ, From TAOS PUEBLO, NM, To SPRINGER, NM; GALAXY SYRACUSE LICENSEE LLC, Station WKRH, Facility ID 56996, BPH-20130708ABZ, From MINETTO, NY, To FAIR HAVEN, NY; GALAXY...
47 CFR 73.319 - FM multiplex subcarrier technical standards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false FM multiplex subcarrier technical standards. 73... SERVICES RADIO BROADCAST SERVICES FM Broadcast Stations § 73.319 FM multiplex subcarrier technical standards. (a) The technical specifications in this Section apply to all transmissions of FM multiplex...
, NREL Technical Report (2017) Energy Assessment Toolkits, NREL Technical Report (2017) Solid-State Lighting Replacement and Maintenance of Lighting Design Goals, NREL Technical Report (2017) Nevada National Security Site 23 Solar and Storage Assessment, NREL Technical Report (2016) Tiller Ranger Station Net Zero
2006-06-01
KENNEDY SPACE CENTER, FLA. - Inside the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane carries the Columbus module toward a work stand. Columbus is the European Space Agency's research laboratory for the International Space Station. Once on the work stand , it will be prepared for delivery to the space station on a future space shuttle mission. Columbus will expand the research facilities of the station and provide researchers with the ability to conduct numerous experiments in the area of life, physical and materials sciences. Photo credit: NASA/Jim Grossmann
2006-06-01
KENNEDY SPACE CENTER, FLA. - Inside the Space Station Processing Facility at NASA's Kennedy Space Center, an overhead crane carries the Columbus module away from its transportation canister. Columbus is the European Space Agency's research laboratory for the International Space Station. The module is being moved to a work stand to prepare it for delivery to the space station on a future space shuttle mission. Columbus will expand the research facilities of the station and provide researchers with the ability to conduct numerous experiments in the area of life, physical and materials sciences. Photo credit: NASA/Jim Grossmann
Obure, Carol Dayo; Jacobs, Rowena; Guinness, Lorna; Mayhew, Susannah; Vassall, Anna
2016-01-01
Theoretically, integration of vertically organized services is seen as an important approach to improving the efficiency of health service delivery. However, there is a dearth of evidence on the effect of integration on the technical efficiency of health service delivery. Furthermore, where technical efficiency has been assessed, there have been few attempts to incorporate quality measures within efficiency measurement models particularly in sub-Saharan African settings. This paper investigates the technical efficiency and the determinants of technical efficiency of integrated HIV and sexual and reproductive health (SRH) services using data collected from 40 health facilities in Kenya and Swaziland for 2008/2009 and 2010/2011. Incorporating a measure of quality, we estimate the technical efficiency of health facilities and explore the effect of integration and other environmental factors on technical efficiency using a two-stage semi-parametric double bootstrap approach. The empirical results reveal a high degree of inefficiency in the health facilities studied. The mean bias corrected technical efficiency scores taking quality into consideration varied between 22% and 65% depending on the data envelopment analysis (DEA) model specification. The number of additional HIV services in the maternal and child health unit, public ownership and facility type, have a positive and significant effect on technical efficiency. However, number of additional HIV and STI services provided in the same clinical room, proportion of clinical staff to overall staff, proportion of HIV services provided, and rural location had a negative and significant effect on technical efficiency. The low estimates of technical efficiency and mixed effects of the measures of integration on efficiency challenge the notion that integration of HIV and SRH services may substantially improve the technical efficiency of health facilities. The analysis of quality and efficiency as separate dimensions of performance suggest that efficiency may be achieved without sacrificing quality. PMID:26803655
Obure, Carol Dayo; Jacobs, Rowena; Guinness, Lorna; Mayhew, Susannah; Vassall, Anna
2016-02-01
Theoretically, integration of vertically organized services is seen as an important approach to improving the efficiency of health service delivery. However, there is a dearth of evidence on the effect of integration on the technical efficiency of health service delivery. Furthermore, where technical efficiency has been assessed, there have been few attempts to incorporate quality measures within efficiency measurement models particularly in sub-Saharan African settings. This paper investigates the technical efficiency and the determinants of technical efficiency of integrated HIV and sexual and reproductive health (SRH) services using data collected from 40 health facilities in Kenya and Swaziland for 2008/2009 and 2010/2011. Incorporating a measure of quality, we estimate the technical efficiency of health facilities and explore the effect of integration and other environmental factors on technical efficiency using a two-stage semi-parametric double bootstrap approach. The empirical results reveal a high degree of inefficiency in the health facilities studied. The mean bias corrected technical efficiency scores taking quality into consideration varied between 22% and 65% depending on the data envelopment analysis (DEA) model specification. The number of additional HIV services in the maternal and child health unit, public ownership and facility type, have a positive and significant effect on technical efficiency. However, number of additional HIV and STI services provided in the same clinical room, proportion of clinical staff to overall staff, proportion of HIV services provided, and rural location had a negative and significant effect on technical efficiency. The low estimates of technical efficiency and mixed effects of the measures of integration on efficiency challenge the notion that integration of HIV and SRH services may substantially improve the technical efficiency of health facilities. The analysis of quality and efficiency as separate dimensions of performance suggest that efficiency may be achieved without sacrificing quality. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.
47 CFR 80.503 - Cooperative use of facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... station or marine utility station on shore may install ship radio stations on board United States... verifying that the ship station licensee has the sole right of control of the ship stations, that the vessel operators must use the ship stations subject to the orders and instructions of the coast station or marine...
Using computer graphics to enhance astronaut and systems safety
NASA Technical Reports Server (NTRS)
Brown, J. W.
1985-01-01
Computer graphics is being employed at the NASA Johnson Space Center as a tool to perform rapid, efficient and economical analyses for man-machine integration, flight operations development and systems engineering. The Operator Station Design System (OSDS), a computer-based facility featuring a highly flexible and versatile interactive software package, PLAID, is described. This unique evaluation tool, with its expanding data base of Space Shuttle elements, various payloads, experiments, crew equipment and man models, supports a multitude of technical evaluations, including spacecraft and workstation layout, definition of astronaut visual access, flight techniques development, cargo integration and crew training. As OSDS is being applied to the Space Shuttle, Orbiter payloads (including the European Space Agency's Spacelab) and future space vehicles and stations, astronaut and systems safety are being enhanced. Typical OSDS examples are presented. By performing physical and operational evaluations during early conceptual phases. supporting systems verification for flight readiness, and applying its capabilities to real-time mission support, the OSDS provides the wherewithal to satisfy a growing need of the current and future space programs for efficient, economical analyses.
Synchrotron topography project. Progress report, January 20, 1982-October 20, 1982
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilello, J.C.; Chen, H.; Hmelo, A.B.
1982-01-01
The collaborators have participated in the Synchrotron Topography Project (STP) which has designed and developed instrumentation for an x-ray topography station at the National Synchrotron Light Source (NSLS) at Brookhaven National Laboratory (BNL). The two principle instruments constructed consist of a White Beam Camera (WBC) and a Multiple Crystal Camera (MCC) with high planar collimation and wide area image coverage. It is possible to perform in-situ studies in a versatile environmental chamber equipped with a miniature mechanical testing stage for both the WBC and MCC systems. Real-time video imaging plus a rapid feed cassette holder for high resolution photographic platesmore » are available for recording topographs. Provisions are made for other types of photon detection as well as spectroscopy. The facilities for the entire station have been designed for remote operation using a LSI-11/23 plus suitable interfacing. These instruments will be described briefly and the current status of the program will be reviewed. The Appendix of this report presents titles, authors and abstracts of other technical work associated with this project during the current period.« less
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 3, STS-120 crew members get a close look at hardware in Discovery's payload bay. In the bucket at left is Mission Specialist Paolo A. Nespoli, who is a European Space Agency astronaut from Italy. The object with the shiny gold surface is a payload bay bulkhead camera. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 3, STS-120 crew members get a close look at hardware in Discovery's payload bay. The crew includes Commander Pamela A. Melroy, Pilot George D. Zamka and Mission Specialists Scott E. Parazynski, Douglas H. Wheelock, Stephanie D. Wilson and Paolo A. Nespoli, who is a European Space Agency astronaut from Italy. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Orbiter Processing Facility bay 3, STS-120 Mission Specialists Scott E. Parazynski and Paolo A. Nespoli (foreground) inspect tools they will use during the mission. Nespoli is a European Space Agency astronaut from Italy. Behind them are Mission Specialist Douglas H. Wheelock and Allison Bolinger, an EVA technician with NASA. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. Inspecting the thermal protection system, or TPS, tiles on space shuttle Discovery in Orbiter Processing Facility bay 3 are Mission Specialists Douglas H. Wheelock and Paolo A. Nespoli, a European Space Agency astronaut from Italy, and Expedition 16 Flight Engineer Daniel M. Tani (with camera). Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - In Discovery's payload bay in Orbiter Processing Facility bay 3, STS-120 crew members are getting hands-on experience with a winch that is used to manually close the payload bay doors in the event that becomes necessary. At center is Pilot George D. Zamka and at right is Expedition 16 Flight Engineer Daniel M. Tani. The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT, which includes harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
2007-08-03
KENNEDY SPACE CENTER, FLA. - The STS-120 crew is at Kennedy for a crew equipment interface test, or CEIT. In Orbiter Processing Facility bay 3, from left in blue flight suits, STS-120 Mission Specialist Stephanie D. Wilson, Pilot George D. Zamka, Commander Pamela A. Melroy, Mission Specialist Scott E. Parazynski (holding camera) and Mission Specialist Douglas H. Wheelock are given the opportunity to operate the cameras that will fly on their mission. Among the activities standard to a CEIT are harness training, inspection of the thermal protection system and camera operation for planned extravehicular activities, or EVAs. The STS-120 mission will deliver the Harmony module, christened after a school contest, which will provide attachment points for European and Japanese laboratory modules on the International Space Station. Known in technical circles as Node 2, it is similar to the six-sided Unity module that links the U.S. and Russian sections of the station. Built in Italy for the United States, Harmony will be the first new U.S. pressurized component to be added. The STS-120 mission is targeted to launch on Oct. 20. Photo credit: NASA/George Shelton
PROGRESS REPORT: COFIRING PROJECTS FOR WILLOW ISLAND AND ALBRIGHT GENERATING STATIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. Payette; D. Tillman
During the period April 1, 2001--June 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) accelerated construction of the Willow Island cofiring project, completed the installation of foundations for the fuel storage facility, the fuel receiving facility, and the processing building. Allegheny received all processing equipment to be installed at Willow Island. Allegheny completed the combustion modeling for the Willow Island project. During this time period construction of the Albright Generating Station cofiring facility was completed, with few items left for final action. The facility was dedicated at a ceremony on June 29. Initial testing of cofiring at the facility commenced.more » This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less
ASTROMAG: A superconducting particle astrophysics magnet facility for the space station
NASA Technical Reports Server (NTRS)
Green, M. A.; Smoot, G. F.; Golden, R. L.; Israel, M. H.; Kephart, R.; Niemann, R.; Mewalt, R. A.; Ormes, J. F.; Spillantini, P.; Widenbeck, M. E.
1986-01-01
This paper describes a superconducting magnet system which is the heart of a particle astrophysics facility to be mounted on a portion of the proposed NASA space station. This facility will complete the studies done by the electromagnetic observatories now under development and construction by NASA. The paper outlines the selection process of the type of magnet to be used to analyze the energy and momentum of charged particles from deep space. The ASTROMAG superconducting magnet must meet all the criteria for a shuttle launch and landing, and it must meet safety standards for use in or near a manned environment such as the space station. The magnet facility must have a particle gathering aperture of at least 1 square meter steradian and the facility should be capable of resolving heavy nuclei with a total energy of 10 Tev or more.
Multimodal system for the planning and guidance of bronchoscopy
NASA Astrophysics Data System (ADS)
Higgins, William E.; Cheirsilp, Ronnarit; Zang, Xiaonan; Byrnes, Patrick
2015-03-01
Many technical innovations in multimodal radiologic imaging and bronchoscopy have emerged recently in the effort against lung cancer. Modern X-ray computed-tomography (CT) scanners provide three-dimensional (3D) high-resolution chest images, positron emission tomography (PET) scanners give complementary molecular imaging data, and new integrated PET/CT scanners combine the strengths of both modalities. State-of-the-art bronchoscopes permit minimally invasive tissue sampling, with vivid endobronchial video enabling navigation deep into the airway-tree periphery, while complementary endobronchial ultrasound (EBUS) reveals local views of anatomical structures outside the airways. In addition, image-guided intervention (IGI) systems have proven their utility for CT-based planning and guidance of bronchoscopy. Unfortunately, no IGI system exists that integrates all sources effectively through the complete lung-cancer staging work flow. This paper presents a prototype of a computer-based multimodal IGI system that strives to fill this need. The system combines a wide range of automatic and semi-automatic image-processing tools for multimodal data fusion and procedure planning. It also provides a flexible graphical user interface for follow-on guidance of bronchoscopy/EBUS. Human-study results demonstrate the system's potential.
The Smartphone Brain Scanner: A Portable Real-Time Neuroimaging System
Stopczynski, Arkadiusz; Stahlhut, Carsten; Larsen, Jakob Eg; Petersen, Michael Kai; Hansen, Lars Kai
2014-01-01
Combining low-cost wireless EEG sensors with smartphones offers novel opportunities for mobile brain imaging in an everyday context. Here we present the technical details and validation of a framework for building multi-platform, portable EEG applications with real-time 3D source reconstruction. The system – Smartphone Brain Scanner – combines an off-the-shelf neuroheadset or EEG cap with a smartphone or tablet, and as such represents the first fully portable system for real-time 3D EEG imaging. We discuss the benefits and challenges, including technical limitations as well as details of real-time reconstruction of 3D images of brain activity. We present examples of brain activity captured in a simple experiment involving imagined finger tapping, which shows that the acquired signal in a relevant brain region is similar to that obtained with standard EEG lab equipment. Although the quality of the signal in a mobile solution using an off-the-shelf consumer neuroheadset is lower than the signal obtained using high-density standard EEG equipment, we propose mobile application development may offset the disadvantages and provide completely new opportunities for neuroimaging in natural settings. PMID:24505263
NASA Technical Reports Server (NTRS)
1983-01-01
Early space station accommodation, build-up of space station manipulator capability, on-orbit spacecraft assembly test and launch, large antenna structure deployment, service/refurbish satellite, and servicing of free-flying materials processing platform are discussed.
The development of the Canadian Mobile Servicing System Kinematic Simulation Facility
NASA Technical Reports Server (NTRS)
Beyer, G.; Diebold, B.; Brimley, W.; Kleinberg, H.
1989-01-01
Canada will develop a Mobile Servicing System (MSS) as its contribution to the U.S./International Space Station Freedom. Components of the MSS will include a remote manipulator (SSRMS), a Special Purpose Dexterous Manipulator (SPDM), and a mobile base (MRS). In order to support requirements analysis and the evaluation of operational concepts related to the use of the MSS, a graphics based kinematic simulation/human-computer interface facility has been created. The facility consists of the following elements: (1) A two-dimensional graphics editor allowing the rapid development of virtual control stations; (2) Kinematic simulations of the space station remote manipulators (SSRMS and SPDM), and mobile base; and (3) A three-dimensional graphics model of the space station, MSS, orbiter, and payloads. These software elements combined with state of the art computer graphics hardware provide the capability to prototype MSS workstations, evaluate MSS operational capabilities, and investigate the human-computer interface in an interactive simulation environment. The graphics technology involved in the development and use of this facility is described.