Sample records for study installation restoration

  1. Installation-restoration program. Phase 2. Confirmation/quantification. Stage 1 for Shaw Air Force Base, South Carolina. Final report, January 1984-October 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alexander, W.J.; Liddle, S.K.

    1986-09-01

    The primary objectives of this project were to collect and analyze groundwater, surface water, and sediment samples and to perform an initial characterization of the hydrogeochemical regime at potential contamination sites on Shaw Air Force Base near Sumter, South Carolina. This study constituted Phase II of the U.S. Air Force Installation Restoration Program (IRP). Five potential sources of groundwater pollution were studied. The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of groundwater monitoring wells, and the analyses of soil, surface water, and groundwater samples. Also used in the study were field measurements ofmore » water quality, water-level measurements site observations, published hydrogeologic data and Shaw AFB documents.« less

  2. Installation Restoration Program. Phase II. Problem Confirmation Study, Westover AFB, Chicopee, Massachusetts.

    DTIC Science & Technology

    1984-05-01

    surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...CHESTER PH MAY 84 UNCLASSIFIED F336 iS-80-D-4-86 F/G 5/ 1 NL I l/hlhh..E/hhE mhh~hhElhElhhI mhhmhmmhhmhl Iflf lllflflflflfllfl mhhhhhmhhmmhhu Llw 111112...w1L 1 6 MICROCOPY RESOLUTION TEST CHART NATIONIAL BUREAU OF STANDARDS- 1963-A Installation Restoration Proaram AD-A 145 352 * Final Report Phase 11

  3. 32 CFR 202.1 - Purpose, scope, definitions, and applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... dialogue with, and provide comments and advice to the installation's decision makers concerning environmental restoration matters. Installations shall give careful consideration to the comments provided by... program. (2) Environmental restoration shall include the identification, investigation, research and...

  4. 32 CFR 202.1 - Purpose, scope, definitions, and applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... dialogue with, and provide comments and advice to the installation's decision makers concerning environmental restoration matters. Installations shall give careful consideration to the comments provided by... program. (2) Environmental restoration shall include the identification, investigation, research and...

  5. First year results from an experimental study of the ecohydrologic benefits of beaver and beaver dam analogue restoration techniques in Childs Meadow, CA

    NASA Astrophysics Data System (ADS)

    Yarnell, S. M.; Pope, K.; Podolak, K.; Wolf, E.; Burnett, R.

    2016-12-01

    Due to extensive livestock grazing and widespread removal of beaver and willows, headwater meadows have transformed from multi-thread channels with seasonally active floodplains into single thread, incised channels that store less carbon, retain less water, and are lower in habitat quality for a diverse suite of meadow-dependent wildlife. Meadow restoration techniques often include willow planting and cattle exclosures; however, few studies have rigorously tested the long-term efficacy of these methods or evaluated alternative restoration techniques such as reintroduction of beaver or installation of beaver dam analogues (BDAs). This project seeks to evaluate the installation of BDAs as a restoration technique in Childs Meadow, a heavily grazed meadow in the Cascade Range representative of low-gradient meadows across northern California. Using a before-after-control-impact study design, the study tests the impacts of two restoration techniques (willow planting with cattle exclusion and willow planting with cattle exclusion and BDAs) on hydrology, carbon sequestration, and sensitive species. Results will be compared with measurements in an unrestored section of the meadow that currently supports an active beaver population and two imperiled species (Cascades Frog and Willow Flycatcher). One specific project objective is to measure the response of hydrogeomorphic conditions (e.g. groundwater, surface water, temperature, habitat) and Cascades Frog and Willow Flycatcher to restorative actions. Pre-treatment data was collected in summer 2015, a cattle exclosure was established and willows were planted in fall 2015, and installation of the BDAs is planned for fall 2016. Three years of post-implementation monitoring will be completed to assess impacts of the treatments. Here, we will present our sampling design and first year results following initiation of the treatments.

  6. United States Air Force 611th Air Support Group/Civil Engineering Squadron Elmendorf AFB, Alaska. Remedial investigation and feasibility study. Bullen Point Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-03-18

    The United States Air Force (Air Force) has prepared this Remedial investigation/Feasibility Study (RI/FS) report as part of the Installation Restoration Program (IRP) to present results of RI/FS activities at five sites at the Bullen Point radar installation. The IRP provides for investigating, quantifying, and remediating environmental contamination from past waste management activities at Air Force installations throughout the United States.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nashold, B.; Rosenblatt, D.; Hau, J.

    This summary describes a Supplemental Site Inspection (SSI) conducted by Argonne National Laboratory (ANL) at Air Force Plant 59 (AFP 59) in Johnson City, New York. All required data pertaining to this project were entered by ANL into the Air Force-wide Installation Restoration Program Information System (IRPIMS) computer format and submitted to an appropriate authority. The work was sponsored by the United States Air Force as part of its Installation Restoration Program (IRP). Previous studies had revealed the presence of contaminants at the site and identified several potential contaminant sources. Argonne`s study was conducted to answer questions raised by earliermore » investigations.« less

  8. Shortleaf pine-bluestem habitat restoration in the Interior Highlands: Implications for stand growth and regeneration

    Treesearch

    James M. Guldin; John Strom; Warren Montague; Larry D. Hedrick

    2004-01-01

    National Forest managers in the Interior Highlands of Arkansas are restoring 155,000 acres of unburned shortleaf pine stands to shortleaf pine-bluestem habitat. Habitat restoration consists of longer rotations, removal of midstory hardwoods, and reintroduction of fire. A study was installed in the spring of 2000 to evaluate shortleaf pine regeneration and overstory...

  9. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-155) - Blind Slough Restoration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wittpenn, Nancy A.

    2004-07-09

    This project proposes to restore tidal connection between the Columbia River Estuary and Blind Slough through the replacement and/or installation of culverts, installation of water control devices, breaching of dikes, and channel enhancement. These enhancements would restore connectivity to approximately ten (10) miles of slough channels previously isolated from tidal influence due to dikes, road crossings, and constrained culverts.

  10. Handbook to Support the Installation Restoration Program (IRP) statements of Work. Volume 1. Remedial Investigation/Feasibility Studies (RI/FS)

    DTIC Science & Technology

    1991-05-01

    FEASIBILITY STUDIES (RI/FS) ENVIRONMENTAL RESTORATION DIV STAFF MAY 1991 (REPRINT) - Distribution is unlimited; approved for public release ENVIRONMENTAL ...RESTORATION DIVISION (ESR) ENVIRONMENTAL SERVICES OFFICE AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE (AFCEE) BROOKS AIR FORCE BASE, TEXAS S(4 93-05296...Human Systems Division’s Human Systems Program Office, IRP Divisicn (HSD/YAQ) was transferred to the newly formed Air Force Center for Environmental

  11. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reports include, but are not limited to: (i) Installation restoration program site studies, engineering documents, such as site inspections, remedial investigations, feasibility studies, engineering evaluation...

  12. Installation Restoration Program Records Search for Kingsley Field, Oregon.

    DTIC Science & Technology

    1982-06-01

    Hazardous Assesment Rating Methodology (HARM), is now used for all Air Force IRP studies. To maintain consistency, AFESC had their on-call contractors review...Installation History D. Industrial Facilities E. POL Storage Tanks F. Abandoned Tanks G. Oil/Water Separators :" H. Site Hazard Rating Methodology I. Site...and implementing regulations. The pur- pose of DOD policy is to control the migration of hazardous material contaminants from DOD installations. 3

  13. Evaluation of pore-water samplers at a drainage ditch, Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, 2005–06

    USGS Publications Warehouse

    Vroblesky, Don A.; Casey, Clifton C.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used innovative sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report evaluates a new type of pore-water sampler developed for this investigation to examine the subsurface contamination beneath the drainage ditch. The new type of pore-water sampler appears to be an effective approach for long-term monitoring of ground water in the sand and organic-rich mud beneath the drainage ditch.

  14. Installation restoration program. Site investigation report, IRP sites No. 1, No. 2, and No. 3. 106th Civil Engineering Flight, New York Air National Guard, Roslyn Air National Guard Station, Roslyn, New York. Volume 2, Appendices A-G. Site Investigation report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-01

    This a continuation of the Installation Restoration Program, Site Investigation Report IRP Sites No. 1, No. 2 and No. 3 at the New York Air National Guard, Roslyn, New York. The soil boring logs are presented.

  15. Supplemental site inspection for Air Force Plant 59, Johnson City, New York, Volume 3: Appendices F-Q

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nashold, B.; Rosenblatt, D.; Hau, J.

    1995-08-01

    This summary describes a Supplemental Site Inspection (SSI) conducted by Argonne National Laboratory (ANL) at Air Force Plant 59 (AFP 59) in Johnson City, New York. All required data pertaining to this project were entered by ANL into the Air Force-wide Installation Restoration Program Information System (IRPIMS) computer format and submitted to an appropriate authority. The work was sponsored by the United States Air Force as part of its Installation Restoration Program (IRP). Previous studies had revealed the presence of contaminants at the site and identified several potential contaminant sources. Argonne`s study was conducted to answer questions raised by earliermore » investigations. This volume consists of appendices F-Q, which contain the analytical data from the site characterization.« less

  16. Department of Defense Data Model, Version 1, Fy 1998, Volume 1.

    DTIC Science & Technology

    1998-05-31

    INSTALLATION-POSTAL-ADDRESS INSTALLATION-RESTORATION- ADVISORY -BOARD INSTALLATION-SURVEY INSTALLATION-USPS-POSTAL-ADDRESS INSTALLMENT- PAYMENT ...Standards 5 U SECTION 5 Entity Report 6 SECTION 6 Attribute Report 7 SECTION 7 Entity Relationship Report 8 SECTION 8 DoD Data Model Enhancements Report ...8 SECTION 9 Functional Area Using Model Report 8 Appendix A IDEFlx Modeling Conventions 8 Appendix B Acronyms ; 8 Appendix

  17. Installation Restoration Program. Phase 1 - Records Search, Elmendorf AFB, Alaska

    DTIC Science & Technology

    1983-09-01

    Installation Restoration Hazardous Waste Management Past Solid Waste Disposal Sites Ground Water Contamination 26. ABSTRACT (CO- ffew. - reev. ilde It necessar...Activity Review 4-1 Industrial Operations (Shops) 4-2 Fire Training 4-13 Fuels Management 4-15 Description of Past On-sane Disposal Methods 4-23 Waste...characteristics, potential for contaminant migration and waste management practices. The details of the rating procedure are presented in Appendix H and the

  18. Installation Restoration Program. Confirmation/Quantification Stage 1. Phase 2

    DTIC Science & Technology

    1985-03-07

    INSTALLATION RESTORATION PROGRAM i0 PHASE II - CONFIRMATION/QUANTIFICATION 0STAGE 1 KIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117 IIl PREPARED BY SCIENCE...APPLICATIONS INTERNATIONAL CORPORATION 505 MARQUETTE NW, SUITE 1200 ALBUQUERQUE, NEW MEXICO 871021 5MARCH 1985 FINAL REPORT FROM FEB 1983 TO MAR 1985...QUANTIFICATION STAGE 1 i FINAL REPORT FOR IKIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117U HEADQUARTERS MILITARY AIRLIFT COMMAND COMMAND SURGEON’S OFFICE (HQ MAC

  19. Installation restoration program. Site investigation report, IRP sites No. 1, No. 2, and No. 3. 106th Civil Engineering Flight, New York Air National Guard, Roslyn Air National Guard Station, Roslyn, New York. Volume 4, appendices I-J. Site Investigation report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-01

    This report is the continuation of the Installation Restoration Program Site Investigation report IRP Sites No. 1, No. 2, and No. 3 at the Air National Guard, Roslyn, New York. The chemical analyses results for soil and ground water samples is reported.

  20. Information Management for Installation Restoration with Focus on Aberdeen Proving Ground, Maryland

    DTIC Science & Technology

    1993-08-01

    savings. Edgewood Area Project Background EA has been the site of extensive military munitions testing and disposal for over 70 years. Onsite burial of...titled "Installation Restoration Data Manage- ment Information System" (IRDMIS). This program, begun in 1975, has undergone several updates as technology ...collocated with AEC on EA, Maryland. Data from geotechnical chemical analysis and field survey results are supplied by AEC-authorized contractors and

  1. Restoration Advisory Board (RAB) Implementation Guidelines

    EPA Pesticide Factsheets

    This document provides recommended procedures for establishing and operating Restoration Advisory Boards (RABs). It is intended as a resource for installation, EPA, and State personnel and citizens who participate in RABs.

  2. Installation Restoration Program. Phase 2. Confirmation/Quantification Stage 2, Moody Air Force Base, Georgia

    DTIC Science & Technology

    1988-11-01

    revri if necenary and iIenitif by block number) FIELO GROUP SUS-GROUP Installation Restoration Program , Groundwater ,P& Soils. Surface water ...qoulkhave been affected by the Site 3 flight line storm drainage outfall. Groundwater quali y samples were collected from the Site 4 water supply well No...monitoring. o Groundwater from the Site 4 water well No. 10 contains no VOCs. Because it remains unclear whether levels of THMs previously measured

  3. Quantification of Uncertainty in the Remedial Investigation/Feasibility Studies Process

    DTIC Science & Technology

    1993-09-01

    Environmental Restoration Division, HQ Air Combat Command at Langley AFB . Without his support this thesis would not have been possible. Through his...Lester, Restoration Program Manager, Wright-Patterson AFB , stated that the Operable Units (OUs) at Wright- Patterson AFB were regrouped (sites moved...provided detailed information on each installation’s sites and OUs and how they were related. For example, the MAP for Hamilton AFB might describe how

  4. McClellan AFB, California, RI/FS Quality Assurance Project Plan. Installation Restoration Program (IRP) Stage 3.

    DTIC Science & Technology

    1992-08-07

    AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old

  5. Installation restoration program. Site investigation report, IRP sites No. 1, No. 2, and No. 3. 106th Civil Engineering Flight, New York Air National Guard, Roslyn Air National Guard Station, Roslyn, New York. Volume 3, Appendix H. Site Investigation report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-01

    This report is a continuation of the Installation Restoration Program site investigation report for IRP Sites No. 1, No. 2 and No. 3 at the Air National Guard, Rosyln, New York. The Sample Delivery Group (SDG) narratives and quality assurance/quality control analytical results of eighteen samples are reported.

  6. Installation Restoration Program Records Search for Des Moines Air National Guard Installation, Iowa

    DTIC Science & Technology

    1983-09-01

    installation. Low-lying drainageways on the site are underlain by soils of the Gravity series and of the Wabash -Gravity-Nodaway complex. These soils...Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- -- ’ cadmium batteries (24/year) and sulfuric

  7. Evaluation of a concrete pavement restoration project in Virginia.

    DOT National Transportation Integrated Search

    1994-01-01

    The purpose of this Federal Highway Administration Demonstration Project was to evaluate the installation and performance of a section of I-81 in Botetourt County, Virginia, that was rehabilitated by concrete pavement restoration (CPR) methods. The s...

  8. 23 CFR 660.519 - Missile installations and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... extraordinary maintenance as necessary to keep the roads serviceable and maintain adequate supporting records of... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...) Restoration under the contract. (1) The highway agency having jurisdiction over the road shall take...

  9. Wide area restoration following biological contamination

    NASA Astrophysics Data System (ADS)

    Yang, Lynn; Hibbard, Wilthea; Edwards, Donna; Franco, David; Fruetel, Julie; Tucker, Mark; Einfeld, Wayne; Knowlton, Robert; Brown, Gary; Brockmann, John; Greenwalt, Robert; Miles, Robin; Raber, Ellen; Carlsen, Tina; Krauter, Paula; Dillon, Michael; MacQueen, Don; Intrepido, Tony; Hoppes, Bill; Wilson, Wendy; Mancieri, Sav

    2008-04-01

    Current understanding of how to restore a wide area that has been contaminated following a large biological attack is limited. The Department of Homeland Security and Department of Defense are executing a four-year collaborative program named the Interagency Biological Restoration Demonstration (IBRD) program. This program is aimed at developing technologies, methods, plans and policies necessary to restore a wide area, including military installations and critical infrastructures, in the event of a large outdoor aerosol release of anthrax. The IBRD program partner pilot city is the Seattle Urban Area to include Fort Lewis, WA and McChord Air Force Base. A front-end systems analysis was conducted as part of IBRD, to: 1) assess existing technologies and processes for wide area restoration; from this, 2) develop an "as-is" decision framework for wide area restoration; and 3) identify and prioritize capability gaps. Qualitative assessments and quantitative analyses, including sensitivity, timeline and case study analyses, were conducted to evaluate existing processes and rank capability gaps. This paper describes the approach and results from this front-end systems analysis.

  10. 7 CFR 1467.10 - Cost-share payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... restrictions on the costs of establishing or installing conservation practices or activities specified in the... easement, 30-year contract, or restoration cost-share agreement, NRCS will offer to pay at least 50 percent... entity may receive, directly or indirectly, for one or more restoration cost-share agreements, for any...

  11. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... generated. Adequate power capacity must be provided for the operation of test and working equipment of the... restoration of power, the batteries must be restored to full charge within 24 hours. When primary power is... battery must permit continuation of normal operation for at least two hours under the normal operating...

  12. Installation Restoration Program. Preliminary Assessment: 177th Fighter Interceptor Group, New Jersey Air National Guard, Atlantic City International Airport, Atlantic City, New Jersey

    DTIC Science & Technology

    1989-11-01

    and/or spill sites on Department of Defense (DoD) installations, and " Control hazards to human health, welfare, and the environment that may have...Investigations do not indicate harmful levels of contamination and do not pose a significant threat to human health or the environment. The site does not warrant...Feasibility Study - Investigation confirms the presence of contamination that may pose a threat to human health and/or the environment, and some sort of

  13. Sediment dynamics in restored riparian forest with different widths and agricultural surroundings

    NASA Astrophysics Data System (ADS)

    Stucchi Boschi, Raquel; Simões da Silva, Laura; Ribeiro Rodrigues, Ricardo; Cooper, Miguel

    2016-04-01

    The riparian forests are essential to maintaining the quality of water resources, aquifer recharge and biodiversity. Due to the ecological services provided by riparian forests, these areas are considered by the law as Permanent Preservation Areas, being mandatory maintenance and restoration. However, the obligation of restoration and the extent of the Permanent Preservation Areas as defined by the Brazilian Forest Code, based on water body width, elucidates the lack of accurate scientific data on the influence of the size of the riparian forest in maintaining their ecological functions, particularly regarding the retention of sediments. Studies that evaluate the ideal width of riparian forests to guarantee their ecological functions are scarce and not conclusive, especially when we consider newly restored forests, located in agricultural areas. In this study, we investigate the dynamics of erosion and sedimentation in restored riparian forests with different widths situated in agricultural areas. The two study areas are located in a Semideciduous Tropical Forest inserted in sugarcane landscapes of São Paulo state, Brazil. The installed plots had 60 and 100 m in length and the riparian forest has a width of 15, 30 and 50 m. The characteristics of the sediments inside the plots were evaluated by detailed morphological and micromorphological studies as well as physical characterization. The dynamics of deposition and the amount of deposited sediments have been assessed with graded metal stakes partially buried inside the plots. The intensity, frequency and distribution of rainfall, as well as the occurrence of extreme events, have been evaluated by data collected from rain gauges installed in the areas. We expect that smaller widths are not able to retain sediments originated from the adjacent sugarcane areas. We also believe that extreme events are responsible for generating most of the sediments. The results will be important to support the discussion about an ideal width of riparian vegetation to ensure the retention of sediments and quality of water bodies.

  14. Invasive Species Guidebook for Department of Defense Installations in the Chesapeake Bay Watershed: Identification, Control, and Restoration

    DTIC Science & Technology

    2007-11-01

    INSTALLATIONS IN THE CHESAPEAKE BAY WATERSHED IDENTIFICATION AND CONTROL METHODS Cogongrass ( Imperata cylindrica ) Description & Biology – A large...Crown vetch Coronilla varia MD, VA 14 Leafy spurge Euphorbia esula VA 15 Ground ivy Glechoma hederacea DC, MD, PA, VA, WV 17 Cogongrass Imperata

  15. The effects of ecological restoration, on soil-pore water quality and DOC concentrations, on a British upland blanket bog.

    NASA Astrophysics Data System (ADS)

    Qassim, Suzane; Dixon, Simon; Rowson, James; Worrall, Fred; Evans, Martin

    2013-04-01

    Polluted by past atmospheric deposition, eroded and burnt, the Bleaklow plateau (Peak district National Park, UK) has long been degraded. Peatlands are important carbon reservoirs and can act as sources or sinks of carbon. Dissolved organic carbon (DOC) is carbon lost from peatlands via the fluvial pathway and as the major component of water colour it is costly to remove during water treatment processes. The Bleaklow Summit peatlands, were subjected to a large wildfire in 2003 devegetating 5.5km2. This fire prompted stakeholders to initiate a large-scale programme of restoration of the plateau. This study considered restoration techniques across four sites: all four sites were seeded with lawn grass, limed and fertilised; to raise the pH and allow establishment of vegetation. In addition to these interventions, one site also had a mulch of Calluna vulgaris applied to the surface to allow soil stabilisation and promote vegetation establishment and another site had biodegradable geojute textile mesh installed, to stabilize the steep gully surfaces. Another site had a gully block installed, to reduce peat desiccation and erosion. This study will compare the four restored sites to two types of comparators: bare soil sites where no restoration was undertaken and a naturally vegetated site unaffected by the 2003 wildfire. Each site had six replicate dipwells, installed in two groups of three. The depth to the water table was monitored and soil water samples collected for analysis, monthly for 5 years, from Nov 2006 - Jan 2012. No significant difference in DOC concentration was found between control and treated sites. There was, however, a significant difference in DOC composition between sites and over the 5 year period of monitoring. UV-vis absorbance of the samples is used to quantify the fulvic to humic components of DOC. The vegetated control was not significantly different to the bare sites; however the vegetated control had a significantly greater humic fraction of than the seeded, limed and fertilised only site, as well as the seeded, limed, C. vulgaris mulched site. This is possibly related to vegetation and litter layer establishment. A suite of water quality data (conductivity, pH and cation data) are now being analysed in combination with DOC to increase understanding of the relationship between bare site re-vegetation and DOC compositional change.

  16. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1

    DTIC Science & Technology

    1986-03-28

    Comftin,,,on Fvvem in.eea),a n dftl by bloe * numri ~A Problem Confirmation Study was conducted at Burlington Air National Guard BasE in Vermont. The...cont’d) 3. Characteristics(cont’d)- Biological Agent ( ) Volatile (4f Toxic (). Reactive ( ) 4. Toxicity: TLVs IDLHs 5. Special Hazards 6. Acute

  17. Installation Restoration Program. Phase I: Records Search Willow Grove Air Reserve Facility, Willow Grove, Pennsylvania.

    DTIC Science & Technology

    1984-11-01

    FLOW CHART Complet List of Location/Shtes Evaluation of Past Operations at LUste SNMe * ~Potential Hazard to Healh WelareS Reglaor Agencon consolidat...siting studies were also a part of this tions, soil, groundwater sampling and large complex project. analysis, and remedial concept engi- neering. Project

  18. Ten years of oak restoration in city of Walnut Creek open spaces

    Treesearch

    Ralph Kraetsch

    2002-01-01

    The Oak Habitat Restoration Project began in 1991 when several individuals recognized that the oak woodlands and savannas of Walnut Creek's nearly 2,800 acres of open spaces had little natural regeneration. This group gathered volunteers who harvested acorns, planted them, and then installed tree shelters and watered the resulting seedlings. The Project soon...

  19. Restoration planting options for limber pine (Pinus flexilis James) in the Southern Rocky Mountains

    Treesearch

    A. M. A. Casper; W. R. Jacobi; Anna Schoettle; K. S. Burns

    2016-01-01

    Limber pine Pinus flexilis James populations in the southern Rocky Mountains are threatened by the combined impacts of mountain pine beetles and white pine blister rust. To develop restoration planting methods, six P. flexilis seedling planting trial sites were installed along a geographic gradient from southern Wyoming to southern Colorado. Experimental...

  20. 50 CFR 86.70 - What are my requirements to acquire, install, operate, and maintain real and personal property?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What are my requirements to acquire, install, operate, and maintain real and personal property? 86.70 Section 86.70 Wildlife and Fisheries...-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM How States Manage Grants...

  1. Installation Restoration Program. Phase 1 - Records Search AAC-Northern Region, Galena AFS, Campion AFS, Cape Lisburne AFS, Fort Yukon AFS, Indian Mountain AFS, Kotzebue AFS, Murphy Dome AFS, and Tin City AFS

    DTIC Science & Technology

    1985-09-01

    GM SILTY GRAVEL GP POORLY GRADED GRAVEL SM SILTY SAND SP POORLY GRADED SAND SW WELL GRADED SAND ML LOW PLASTICITY SILT SOURCE: INSTALLATION DOCUMENTS... plastic on the side toward th’e beach in an attempt to prevent migration of fuel. to the beach. During the site visit for this Phase I IRP study the...Force have included garbage, refuse, incinerator ash (since 1975), wood, metal, plastic and bulky - materials such as construction and demolition debris

  2. Investigation of ground-water contamination at a drainage ditch, Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, 2005–06

    USGS Publications Warehouse

    Vroblesky, Don A.; Casey, Clifton C.

    2007-01-01

    The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.

  3. Sediment transport on Cape Sable, Everglades National Park, Florida

    USGS Publications Warehouse

    Zucker, Mark; Boudreau, Carrie

    2010-01-01

    The Cape Sable peninsula is located on the southwestern tip of the Florida peninsula within Everglades National Park (ENP). Lake Ingraham, the largest lake within Cape Sable, is now connected to the Gulf of Mexico and western Florida Bay by canals built in the early 1920's. Some of these canals breached a natural marl ridge located to the north of Lake Ingraham. These connections altered the landscape of this area allowing for the transport of sediments to and from Lake Ingraham. Saline intrusion into the formerly fresh interior marsh has impacted the local ecology. Earthen dams installed in the 1950's and 1960's in canals that breached the marl ridge have repeatedly failed. Sheet pile dams installed in the early 1990's subsequently failed resulting in the continued alteration of Lake Ingraham and the interior marsh. The Cape Sable Canals Dam Restoration Project, funded by ENP, proposes to restore the two failed dams in Lake Ingraham. The objective of this study was to collect discharge and water quality data over a series of tidal cycles and flow conditions to establish discharge and sediment surrogate relations prior to initiating the Cape Sable Canals Dam Restoration Project. A dry season synoptic sampling event was performed on April 27-30, 2009.

  4. Hydrologic response of streams restored with check dams in the Chiricahua Mountains, Arizona

    USGS Publications Warehouse

    Norman, Laura M.; Brinkerhoff, Fletcher C.; Gwilliam, Evan; Guertin, D. Phillip; Callegary, James B.; Goodrich, David C.; Nagler, Pamela L.; Gray, Floyd

    2016-01-01

    In this study, hydrological processes are evaluated to determine impacts of stream restoration in the West Turkey Creek, Chiricahua Mountains, southeast Arizona, during a summer-monsoon season (June–October of 2013). A paired-watershed approach was used to analyze the effectiveness of check dams to mitigate high flows and impact long-term maintenance of hydrologic function. One watershed had been extensively altered by the installation of numerous small check dams over the past 30 years, and the other was untreated (control). We modified and installed a new stream-gauging mechanism developed for remote areas, to compare the water balance and calculate rainfall–runoff ratios. Results show that even 30 years after installation, most of the check dams were still functional. The watershed treated with check dams has a lower runoff response to precipitation compared with the untreated, most notably in measurements of peak flow. Concerns that downstream flows would be reduced in the treated watershed, due to storage of water behind upstream check dams, were not realized; instead, flow volumes were actually higher overall in the treated stream, even though peak flows were dampened. We surmise that check dams are a useful management tool for reducing flow velocities associated with erosion and degradation and posit they can increase baseflow in aridlands.

  5. Restoration of Aspen-Dominated Ecosystem in the Lake States

    Treesearch

    Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner

    2001-01-01

    A reserve tree method(RTM)of harvesting was installed in six 70-to75-year-old aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...

  6. Restoration of aspen-dominated ecosystems in the Lake States

    Treesearch

    Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner

    2000-01-01

    A reserve tree method (RTM) of harvesting was installed in six 70-to75-year old aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...

  7. Restoration of aspen-dominated ecosystems in the Lake States

    Treesearch

    Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner

    2001-01-01

    A reserve tree method (RTM) of harvesting was installed in six 70- to 75-yearold aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...

  8. Invasive Species Guidebook for Department of Defense Installations in the Delaware River Basin: Identification, Control, and Restoration

    DTIC Science & Technology

    2009-06-01

    155 SECTION II: PREVENTING RECURRING INVASIVE SPECIES AND RESTORING HISTORICAL PLANT COMMUNITIES ...Wilcove et al. 1998, Westbrook et al. 2005). Beyond degradation to ecological communities , invasive species can threaten human health and cause...recurrence of problem invasive species. This section also gives recommendations for returning management areas to historical native plant communities

  9. Reestablishing natural succession on acidic mine spoils at high elevations: long-term ecological restoration

    Treesearch

    Ray W. Brown; Michael C. Amacher; Walter F. Mueggler; Janice Kotuby-Amacher

    2003-01-01

    Methods for restoring native plant communities on acidic mine spoils at high elevations were evaluated in a "demonstration area" in the New World Mining District of southern Montana. Research plots installed in 1976 were assessed for 22 years and compared with adjacent native reference plant communities. A 1.5-acre (0.61-ha) area of mine spoils was shaped and...

  10. Bearing Restoration by Grinding

    DTIC Science & Technology

    1976-05-21

    lIng of bearings prior to installation, installing a contaminated bearing, manufacturing defects, ring growth in service, and corrosion. Nonmetallic...operation of rolling-elemsnt bearings is growth of the bearing race rings. As an example, the inner or outer races, can grow due to metallurgical...transformations or due to hoop stresses during operation This growth results in the bearing being not reusable after removal from its application. For aircraft

  11. Installation Restoration Program Management Plan

    DTIC Science & Technology

    1999-03-01

    Proving Ground Dugway Proving Ground White Sands Missile Range Yuma Proving Ground Aviation Missile Command Redstone Arsenal Letterkenny Army Depot...approved for Public Release DUC QUALITY INSPECTED 3 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND ...environmental documents. The TIC is located at the USAEC at Aberdeen Proving Ground , MD. If an installation or MACOM/MSC is not aware of

  12. 50 CFR 86.114 - Do I need to conduct a survey if I already have a plan for installing tie-up facilities?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Do I need to conduct a survey if I already have a plan for installing tie-up facilities? 86.114 Section 86.114 Wildlife and Fisheries UNITED... SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM How States Will Complete...

  13. HST image restoration: A comparison of pre- and post-servicing mission results

    NASA Technical Reports Server (NTRS)

    Hanisch, R. J.; Mo, J.

    1992-01-01

    A variety of image restoration techniques (e.g., Wiener filter, Lucy-Richardson, MEM) have been applied quite successfully to the aberrated HST images. The HST servicing mission (scheduled for late 1993 or early 1994) will install a corrective optics system (COSTAR) for the Faint Object Camera and spectrographs and replace the Wide Field/Planetary Camera with a second generation instrument (WF/PC-II) having its own corrective elements. The image quality is expected to be improved substantially with these new instruments. What then is the role of image restoration for the HST in the long term? Through a series of numerical experiments using model point-spread functions for both aberrated and unaberrated optics, we find that substantial improvements in image resolution can be obtained for post-servicing mission data using the same or similar algorithms as being employed now to correct aberrated images. Included in our investigations are studies of the photometric integrity of the restoration algorithms and explicit models for HST pointing errors (spacecraft jitter).

  14. 32 CFR 202.13 - Technical assistance for public participation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRC may request technical assistance for interpreting scientific and engineering issues with regard to the nature of environmental hazards at the installation and environmental restoration activities...

  15. Installation Restoration Program. Feasibility Study for Sites 1, 3, 5, 6, 7, 8, and 9. Michigan Air National Guard. Alpena Combat Readiness Training Center, Alpena, Michigan.

    DTIC Science & Technology

    1996-04-01

    This study is to screen and evaluate remediation alternatives for IRP sites at Alpena CR TC, Alpena , MI. The purpose of this FS is to develop, screen... Alpena CRTC. The first step in the PS process is to identify the RAOs and general response actions (GRAs). RAOs consist of medium-specific or site

  16. Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.

    DTIC Science & Technology

    1982-04-01

    Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975

  17. Effects of prescribed burning on vegetation and fuel loading in three east Texas state parks

    Treesearch

    Sandra Rideout; Brian P. Oswald

    2002-01-01

    This study was conducted to evaluate the initial effectiveness of prescribed burning in the ecological restoration of forests within selected parks in east Texas. Twenty-four permanent plots were installed to monitor fuel loads, overstory, sapling, seedling, shrub and herbaceous layers within burn and control units of Mission Tejas, Tyler and Village Creek state parks...

  18. Plant basket hydraulic structures (PBHS) as a new river restoration measure.

    PubMed

    Kałuża, Tomasz; Radecki-Pawlik, Artur; Szoszkiewicz, Krzysztof; Plesiński, Karol; Radecki-Pawlik, Bartosz; Laks, Ireneusz

    2018-06-15

    River restoration has become increasingly attractive worldwide as it provides considerable benefits to the environment as well as to the economy. This study focuses on changes of hydromorphological conditions in a small lowland river recorded during an experiment carried out in the Flinta River, central Poland. The proposed solution was a pilot project of the construction of vegetative sediment traps (plant basket hydraulic structures - PBHS). A set of three PBSH was installed in the riverbed in one row and a range of hydraulic parameters were recorded over a period of three years (six measurement sessions). Changes of sediment grain size were analysed, and the amount and size of plant debris in the plant barriers were recorded. Plant debris accumulation influencing flow hydrodynamics was detected as a result of the installation of vegetative sediment traps. Moreover, various hydromorphological processes in the river were initiated. Additional simulations based on the detected processes showed that the proposed plant basket hydraulic structures can improve the hydromorphological status of the river. Copyright © 2018 Elsevier B.V. All rights reserved.

  19. Application of Long Distance Conveyance (LDC) of Dredged Sediments to Louisiana Coastal Restoration

    DTIC Science & Technology

    2011-01-01

    U.S. Army Engineer District, New Orleans, Laura Beldon, Louisiana Office of Coastal Protection and Restoration, Cheryl Brodnax, National...Louisiana Department of Natural Resources, Christopher Knotts , Louisiana Department of Natural Resources, Fay Lachney, MVN, Luke LeBas, Louisiana...associated with the petrochemical industry (e.g., Van Dyke et al. 1994) or backfilled canals dredged as part of the pipeline installation (e.g., Knott et al

  20. Installation-Restoration Program Preliminary Assessment, Naknek Recreational Camps, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-04-01

    The Hazardous Materials Technical Center (HMTC) was retained in January 1988 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment of Naknek Recreational Camps, Alaska, DoD policy is to identify and fully evaluate suspected problems associated with past hazardous-material disposal sites on DoD facilities, control the migration of hazardous contamination from such facilities, and control hazards to health and welfare that may have resulted from these past operations. Past installation operations involved the use and disposal of materials and wastes that were subsequently categorized as hazardous. The major operations of Naknek Camp I and Camp II did not use or disposemore » of HM/HW; however, these camps were used by the Air Force as dump areas and landfills. Waste oils, fuels, and polychlorinated biphenyls (PCBs) were among the wastes disposed of during these dumping activities. Information obtained through interviews, records, and field observations resulted in the identification of three sites that are potentially contaminated with HM/HW. At each of the identified sites, the potential exists for contamination of surface water, soils, and/or ground water and subsequent contaminant migration.« less

  1. Responses to riparian restoration in the Spring Creek watershed, Central Pennsylvania

    USGS Publications Warehouse

    Carline, R.F.; Walsh, M.C.

    2007-01-01

    Riparian treatments, consisting of 3- to 4-m buffer strips, stream bank stabilization, and rock-lined stream crossings, were installed in two streams with livestock grazing to reduce sediment loading and stream bank erosion. Cedar Run and Slab Cabin Run, the treatment streams, and Spring Creek, an adjacent reference stream without riparian grazing, were monitored prior to (1991-1992) and 3-5 years after (2001-2003) riparian buffer installation to assess channel morphology, stream substrate composition, suspended sediments, and macroinvertebrate communities. Few changes were found in channel widths and depths, but channel-structuring flow events were rare in the drought period after restoration. Stream bank vegetation increased from 50% or less to 100% in nearly all formerly grazed riparian buffers. The proportion of fine sediments in stream substrates decreased in Cedar Run but not in Slab Cabin Run. After riparian treatments, suspended sediments during base flow and storm flow decreased 47-87% in both streams. Macroinvertebrate diversity did not improve after restoration in either treated stream. Relative to Spring Creek, macroinvertebrate densities increased in both treated streams by the end of the posttreatment sampling period. Despite drought conditions that may have altered physical and biological effects of riparian treatments, goals of the riparian restoration to minimize erosion and sedimentation were met. A relatively narrow grass buffer along 2.4 km of each stream was effective in improving water quality, stream substrates, and some biological metrics. ?? 2007 Society for Ecological Restoration International.

  2. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Reese Air Force Base, Lubbock, Texas. Volume 2. Appendices

    DTIC Science & Technology

    1988-04-01

    epidemiological studies ; pending resolution of essentiality in human diet; EPA has not regulated arsenic as a carcinogen in drinking water 3ICadmium B1...Probable human carcinogen based upon sufficient evidence in epidemiological studies ; not regulated as a carcinogen in drinking water because there is...Carcinogenic in animal studies ; because of the extensive negative epidemiological evidence, EPA has proposed to regu- late lead in drinking water based on

  3. Effects of canopy treatments on early growth of planted longleaf pine seedlings and ground vegetation in North Carolina: a preliminary study

    Treesearch

    Huifeng Hu; Benjamin O. Knapp; G. Geoff Wang; Joan L. Walker

    2013-01-01

    We installed a field experiment to support the development of protocols to restore longleaf pine (Pinus palustris Mill.) to existing mature loblolly pine (P. taeda L.) stands at Camp Lejeune, NC. Seven canopy treatments included four uniform and three gap treatments. The four uniform treatments were defined by target residual basal...

  4. Fuels and predicted fire behavior in the southern Appalachian Mountains and fire and fire surrogate treatments

    Treesearch

    Thomas Waldrop; Ross J. Phillips; Dean A. Simon

    2010-01-01

    This study tested the success of fuel reduction treatments for mitigating wildfire behavior in an area that has had little previous research on fire, the southern Appalachian Mountains. A secondary objective of treatments was to restore the community to an open woodland condition. Three blocks of four treatments were installed in a mature hardwood forest in western...

  5. Operable Unit B1 Interim Record of Decision. Installation Restoration Program (IRP)

    DTIC Science & Technology

    1993-07-28

    Geology ..................................... I-1 2.0 SITE HISTORY AND ENFORCEMENT ACTIVITIES ........... 11-5 2.1 Background on Contamination Problems at...McClellan AFB OU BI . 11-5 2.2 Previous Studies ................................ 11-5 2.3 Regulatory and Enforcement History .................... 11-7...1-4 2-1 History of OU BI ...................................... 11-6 4-1 Cross-Section A-A’ of OU B.I

  6. Installation Restoration Program. Phase 1. Records Search, England AFB, Louisiana

    DTIC Science & Technology

    1983-05-01

    compound shown on Figure 4.3. No herbicides, expired DDT or other pesticides were stored at this site. Some battery acid was stored in plastic boxes...Union Carbide Corporation, Chemicals and Plastics Divi- sion, Environomental Engineering Department. As a pro- cess/project engineer performed...paper mill waste treatment facility. Project Manager on Solid and Hazardous Waste study for a diverse chemicals and plastics production facility

  7. Installation Restoration Program. Phase 1. Records Search, Charleston AFB, South Carolina

    DTIC Science & Technology

    1983-10-01

    and plastics plants. Conducted industrial waste surveys, landfill design, and planning for plant environmental protection programs; evaluated air...management study for a major plastics manufacturing company. Responsibilitites included identification and investigation of a number of operating...61 aste Caracteristics 68 Pathways 69 Total 198 divided by 3 = 63 3ross total sc,:re B. Aooly factor for waste containment from waste manaement

  8. Habitat Selection and Behaviour of a Reintroduced Passerine: Linking Experimental Restoration, Behaviour and Habitat Ecology

    PubMed Central

    Bennett, Victoria A.; Doerr, Veronica A. J.; Doerr, Erik D.; Manning, Adrian D.; Lindenmayer, David B.; Yoon, Hwan-Jin

    2013-01-01

    Habitat restoration can play an important role in recovering functioning ecosystems and improving biodiversity. Restoration may be particularly important in improving habitat prior to species reintroductions. We reintroduced seven brown treecreeper (Climacteris picumnus) social groups into two nature reserves in the Australian Capital Territory in south-eastern Australia. This study provided a unique opportunity to understand the interactions between restoration ecology, behavioural ecology and habitat ecology. We examined how experimental restoration treatments (addition of coarse woody debris, variations in ground vegetation cover and nest box installation) influenced the behaviour and microhabitat use of radio-tracked individuals to evaluate the success of restoration treatments. The addition of coarse woody debris benefited the brown treecreeper through increasing the probability of foraging on a log or on the ground. This demonstrated the value of using behaviour as a bio-indicator for restoration success. Based on previous research, we predicted that variations in levels of ground vegetation cover would influence behaviour and substrate use, particularly that brown treecreepers would choose sites with sparse ground cover because this allows better access to food and better vigilance for predators. However, there was little effect of this treatment, which was likely influenced by the limited overall use of the ground layer. There was also little effect of nest boxes on behaviour or substrate use. These results somewhat confound our understanding of the species based on research from extant populations. Our results also have a significant impact regarding using existing knowledge on a species to inform how it will respond to reintroduction and habitat restoration. This study also places great emphasis on the value of applying an experimental framework to ecological restoration, particularly when reintroductions produce unexpected outcomes. PMID:23349923

  9. Turbidity on the Shallow Reef off Kaulana and Hakioawa Watersheds, North Coast of Kaho`olawe, Hawai`iMeasurements of Turbidity and Ancillary Data on Winds, Waves, Precipitation, and Stream flow Discharge, November 2005 to June 2008

    USGS Publications Warehouse

    Presto, M. Katherine; Storlazzi, Curt D.; Field, Michael E.; Abbott, Lyman L.

    2010-01-01

    The island of Kaho`olawe has particular cultural and religious significance for native Hawaiians. Once known as Kanaloa, the island was a center for native Hawaiian navigation. In the mid-20th century, the island was used as a bombing range by the U.S. Navy, and that practice, along with the foraging by feral goats, led to a near-complete decimation of vegetation. The loss of ground cover led to greatly increased erosion and run-off of sediment-laden water onto the island's adjacent coral reefs. Litigation in 1990 ended the U.S. Navy's use of the island as a bombing range, and in 1994 the island was transferred to the Kaho`olawe Island Reserve Commission (KIRC), http://kahoolawe.hawaii.gov/. As a result of the litigation, the U.S. Navy began a 10-year clean-up effort that was the foundation for the present restoration effort by KIRC (Slay, 2009). The restoration effort is centered on revegetating the island, reducing erosion, and limiting run-off onto adjacent reefs. Restoration efforts to mitigate sediment runoff to streams and gulches by restoring native vegetation and minimizing erosion have focused on two watersheds, Kaulana and Hakioawa, on the northeast and northwest sides of the island, respectively. Stream flow and sediment gages were installed by the U.S. Geological Survey Pacific Islands Water Science Center in each of the watersheds, and a weather station was established upland of the watersheds. For this study, turbidity monitors were installed on the insular shelf off the two watersheds to monitor the overall quality of reef waters and their changes in response to rain and stream flow discharge events.

  10. Immediate provisional restoration of a single-tooth implant in the esthetic zone: a case report.

    PubMed

    Fu, Po-Sung; Wu, Yi-Min; Tsai, Ching-Fang; Huang, Ta-Ko; Chen, Wen-Cheng; Hung, Chun-Cheng

    2011-02-01

    Immediate implant restoration of single implants may demonstrate a positive effect on peri-implant soft tissue. Placement of a provisional restoration following implant surgery can create soft tissue contours that resemble normal gingival topography before placement of the definitive prosthesis. This article describes a staged approach of the mandibular permanent right central incisor, which was congenital missing. The proper space for restoration of the missing incisor was created through orthodontic treatment. The scheduled implant site was reconstructed using autogenous bone harvested from the chin region. After a healing period of four months, an implant was installed with the connection of a fixed provisional crown to a prefabricated temporary abutment. The soft tissue around the implant healed according to the contours of the provisional restoration and the emergence profile was used to duplicate the definitive restoration. Peri-implant esthetics was achieved through the staged approach and immediate restoration of the implant. Copyright © 2011. Published by Elsevier B.V.

  11. 76 FR 12629 - Airworthiness Directives; Bombardier, Inc. Model DHC-8-400 Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... maintenance program by incorporating Task 320100-211 (repetitive detailed inspections of the retraction... installation, and corrosion) and Task 320100-212 (repetitive restorations of the retraction actuator for...

  12. Macroinvertebrate Community Response to the Elimination of Concentrated Feedlot Runoff to a Headwater Stream

    NASA Astrophysics Data System (ADS)

    Snitgen, J. L.; Moren, M. M.

    2005-05-01

    During rainfall and snow melt events, a first order, cold-water stream was receiving varying amounts of liquefied manure from a concentrated feed lot. Stream restoration efforts included the implementation of best management practices to prevent further discharge of the water/manure mixture to the stream. Physical, chemical and biological data were collected pre-construction and two years post-construction of the containment system at a fixed location downstream of the feedlot. Hilsenhoff Biotic Index scores improved significantly, from 6.79 or "Fairly Poor" before the installation of the manure containment system, to 5.28 or "Good" after the installation of the manure containment system. Taxa richness improved from 25 to 34 and the EPT score improved from 0 to 4. Key words: macroinvertebrate, community response, manure, feedlot runoff, stream restoration

  13. [COMPLICATIONS OF STENTINGOF UPPER URINARY TRACT].

    PubMed

    Shkodkin, S V; Kogan, M I; Lyubushkin, A V; Miroshnichenko, O V

    2015-01-01

    Restoring the passage of urine through the upper urinary tract routinely is achieved by installing of external or internal drainage. Due to its objective advantages, internal drainage has been successfully used in surgery of the upper urinary tract. This review outlines the problems associated with the use ofinternal stents, namely difficultyin installation, migration, and reflux and stent obstruction, bacterial colonization of the stent, the development of functional and morphological changes in the drained segment of urinary tract.

  14. Installation Restoration Program. Phase 1 - Records Search, Robins AFB, Georgia.

    DTIC Science & Technology

    1982-04-01

    Installations U under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980. PURPOSE AND SCOPE OF THE... Liability Act of 1980 (CERCLA). A potentially hazardous waste is one which is suspected of being hazardous although insufficient data are available to...comprised of a concrete vault buried approximately six feet below the ground surface. 4 A locked chain -linked fence with two barbed wire strands surrounds

  15. Installation Restoration Program Stage 3. McClellan Air Force Base, California. Remedial Investigation/Feasibility Study Groundwater Sampling and Analysis Program Data Summary

    DTIC Science & Technology

    1988-12-01

    and do not refer to monitoring zones at McClellSn AFB. b Priority poLutant metals analyses also included U.S. EPA Methods 206.2, 245.1 and 270.2. EW a...sampling protocol, and the laboratory is audited routinely. Therefore, no corrective action other than good training and supervision is necessary. The same

  16. Installation Restoration Program Records Search for Bergstrom Air Force Base, Texas.

    DTIC Science & Technology

    1983-07-01

    August 1981. "Pilot Plant Study of Copper , Zinc, and Trivalent Chromium Removal by Adsorbing Colloid Foam Flotation ." M.S. Thesis, Vanderbilt...graduate school and one of his activities included researching the removal of heavy metals, including copper , zinc and trivalent chromium, using a large...scale adsorbing colloid foam flotation pilot plant. Professional Registration Engineer-In-Training, Florida % -7. GREGORY T. MCINTYRE Membership in

  17. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Volume 2.

    DTIC Science & Technology

    1986-10-01

    contaminatioa. Details of the data base received daily over a lifetime. For non - feeding studies on experimental used in these projections for each of...might be generated experimentally for a evaluation of the health effects of the highest no-observed-adverse-effect-level non -carcinogenic end-point of...8217 HARDFILL: Disposal sites receiving construction debris, wood, miscellaneous spoil material. HARM: Hazard Assessment Rating Methodology HAZARDOUS

  18. Remedial investigation report, site 2-Pesticide Pit Burial Area, Stewart Air National Guard Base, Newburgh, New York. Volume 1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.

  19. Remedial investigation report, site 2-Pesticide Pit Burial Area, Stewart Air National Guard Base, Newburgh, New York. Volume 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.

  20. Riparian Ecosystem Management at Military Installations: Determination of Impacts and Evaluation of Restoration and Enhancement Strategies

    DTIC Science & Technology

    2007-06-01

    forests , and the water filtration function performed by these ecosystems may be at risk . Maloney, K. O. and J. W. Feminella. 2006. Evaluation of...additions to perennial streams. Phase 1 – Effects of Disturbance In our studies of sedimentation effects on riparian forests , vegetation...riparian forests associated with ephemeral streams. We determined thresholds beyond which both long-term and current rates of sedimentation

  1. Installation Restoration Program. Phase II: Stage 1 Problem Confirmation Study, Duluth International Airport, Duluth, Minnesota.

    DTIC Science & Technology

    1984-10-01

    8 iii "i t-. Table of Contents (cont.) Section Title Page -APPENDIX A Acronyms, Definitions, Nomenclature and Units of Measure B Scope of Work, Task...Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective Action Only...Problem Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective

  2. Installation Restoration Program (IRP). Operable Unit B1 Remedial Investigation/Feasibility Study

    DTIC Science & Technology

    1993-07-01

    Alternative Evaluation Criteria ......................... 8-2 8-2 Remedial Alternative Evaluation Criteria Rating System ................ 8-3 8-3...ies, various technologies and process options relative numerical rating system was developed were identified and screened on the basis of (see Table 8-2...extensive paving and PCBs were found (north/central ditch). This storm drainage system , and because of the ditch was paved with asphalt in 1981; before

  3. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1. Volume 2. Appendix J-M.

    DTIC Science & Technology

    1985-06-28

    1984 to April 1985 includedr installation of 27 raw mnitor wells and 11 amh l’,(1 zjit~s, collecticn cf seive~t, sarples ftw surfac , soil, shallowv...modifying a sampling and analytical program that addresses the requirements of the project. If project requirements necessitate different quality...reagent blank and at least five (5) different concentrations of thl analyte. A modification of the method of Hubaux and Vos will be used to deter

  4. Installation Restoration Program. Phase 1. Records Search 15th ABW Satellite Installations, Hawaii

    DTIC Science & Technology

    1984-09-01

    Hickam POL Storage Facilities and Pipeline The POL storage facilities remotely located from Hickam Air Force Base (AFB...airfield with less activity than nearby Wheeler and Hickam Air Force Bases . Aircraft activity was significantly reduced in the late 1940’s and the...United States Air Force to conduct the Phase I Records Search at the 15th Air Base Wing 1-2 ES ENGINEERING-SCIENCE PHASE I PHASE 11 PHASE IV

  5. Proceedings of the Annual Environmental Systems Symposium (11th) Held at Arlington, Virginia on 19-20 November 1980,

    DTIC Science & Technology

    1980-11-20

    PROGRAMS TO CONTROL ENVIRONMENTAL CONTAMINATION FROM PAST ACTIVITIES. * THEN, I WILL PRESENT OUR MAJOR PROGRAM TO IMtPLEMENT WITHIN THE DEPARTMENT OF...OF DOD’S HAZARDOUS WASTE DISPOSAL PROGRAM AND OUR PROGRAM TO ABATE MIGRATION OF CONTAMINANTS FROM DEFENSE INSTALLATIONS. THE INTENSE QUESTIONS FROM THE...INDUSTRY AND MOST OF THE GOVERNMENT. SINCE 1975, DEFENSE HAS HAD ITS INSTALLATION RESTORATION PROGRAM TO ASSESS AND CONTROL ANY POSSIBLE MIGRATION OF

  6. Environmental Assessment for Capital Improvement Projects, Buckley Air Force Base, Colorado. Volume 2 of 2

    DTIC Science & Technology

    2006-03-01

    2003 Air Emission Inventory, July 2004. o The generators are assumed to be diesel-fired and have a horsepower rating of less than 600 hp. o...In July 2003, the 460th LRS purchased and installed an automated movable storage system for mobility bag storage. This system eliminates wasted aisle...Installation Restoration Program Draft Final Engineering Evaluation/Cost Analysis IRP Site 4. July . • URS Corporation (URS). 2003a. Buckley Air Force

  7. 2015 Review on the Extension of the AMedP-8(C) Methodology to New Agents, Materials, and Conditions

    DTIC Science & Technology

    2016-06-01

    Outside the United States (Washington, DC: DOD, November 2013). 6 4715.07 and 4715.08, deal with environmental remediation and restoration. DODI...May 2013), 2. 9 DODI 4715.08, Remediation of Environmental Contamination Outside the United States (Washington, DC: DOD, November 2013). 10 DODD... remediate damage, both in the United States and on overseas installations. Those policies largely extend U.S. legal requirements to DOD installations

  8. The effects of floodplain forest restoration and logjams on flood risk and flood hydrology

    NASA Astrophysics Data System (ADS)

    Dixon, Simon; Sear, David A.; Sykes, Tim; Odoni, Nicholas

    2015-04-01

    Flooding is the most common natural catastrophe, accounting for around half of all natural disaster related deaths and causing economic losses in Europe estimated at over € 2bn per year. In addition flooding is expected to increase in magnitude and frequency with climate change, effectively shortening the return period for a given magnitude flood. Increasing the height and extent of hard engineered defences in response to increased risk is both unsustainable and undesirable. Thus alternative approaches to flood mitigation are needed such as harnessing vegetation processes to slow the passage of flood waves and increase local flood storage. However, our understanding of these effects at the catchment scale is limited. In this presentation we demonstrate the effects of two river restoration approaches upon catchment scale flood hydrology. The addition of large wood to river channels during river restoration projects is a popular method of attempting to improve physical and biological conditions in degraded river systems. Projects utilising large wood can involve the installation of engineered logjams (ELJs), the planting and enhancement of riparian forests, or a combination of both. Altering the wood loading of a channel through installation of ELJs and increasing floodplain surface complexity through encouraging mature woodland could be expected to increase the local hydraulic resistance, increasing the timing and duration of overbank events locally and therefore increasing the travel time of a flood wave through a reach. This reach-scale effect has been documented in models and the field; however the impacts of these local changes at a catchment scale remains to be illustrated. Furthermore there is limited knowledge of how changing successional stages of a restored riparian forest through time may affect its influence on hydromorphic processes. We present results of a novel paired numerical modelling study. We model changes in flood hydrology based on a 98km² catchment using OVERFLOW; a simplified hydrological model using a spatially distributed unit hydrograph approach. Restoration scenarios for the hydrological modelling are informed by the development of a new conceptual model of riparian forest succession, including quantitative estimates of deadwood inputs to the system, using a numerical forest growth model. We explore scenarios using ELJs alone as well as managed and unmanaged riparian forest restoration at scales from reach to sub-catchment. We demonstrate that changes to catchment flood hydrology with restoration are highly location dependant and downstream flood peaks can in some cases increase through synchronisation of sub-catchment flood waves. We constrain magnitude estimates for increases and decreases in flood peaks for modelled restoration scenarios and scales. Finally we analyse the potential for using riparian forest restoration as part of an integrated flood risk management strategy, including specific examples of type and extent of restoration which may prove most beneficial.

  9. Space Shuttle Mission STS-61: Hubble Space Telescope servicing mission-01

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This press kit for the December 1993 flight of Endeavour on Space Shuttle Mission STS-61 includes a general release, cargo bay payloads and activities, in-cabin payloads, and STS-61 crew biographies. This flight will see the first in a series of planned visits to the orbiting Hubble Space Telescope (HST). The first HST servicing mission has three primary objectives: restoring the planned scientific capabilities, restoring reliability of HST systems and validating the HST on-orbit servicing concept. These objectives will be accomplished in a variety of tasks performed by the astronauts in Endeavour's cargo bay. The primary servicing task list is topped by the replacement of the spacecraft's solar arrays. The spherical aberration of the primary mirror will be compensated by the installation of the Wide Field/Planetary Camera-II and the Corrective Optics Space Telescope Axial Replacement. New gyroscopes will also be installed along with fuse plugs and electronic units.

  10. Installation restoration program. Site investigation report, IRP sites No. 1, No. 2, and No. 3. 106th Civil Engineering Flight, New York Air National Guard, Roslyn Air National Guard Station, Roslyn, New York. Volume 1. Site Investigation report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-01

    This report presents the results of the Site Investigation (SI) conducted at IRP Sites No. 1, No. 2, and No. 3 at the 106th Civil Engineering Flight (CEF) located at Roslyn Air National Guard Station (ANGS), Roslyn, Long Island, New York. A Preliminary Assessment (PA) (AD-A238 847) of the 106th CEF resulted in the identification of two potentially contaminated waste holding areas and a waste sludge application site. These sites were identified as IRP Site No. 1 (Access Road to Aerospace Ground Equipment `AGE` Shop), IRP Site No. 2 (Old Waste Holding Area No. 1), and IRP Site No. 3more » (Old Waste Holding Area No. 2) and recommended for further investigation under the Installation Restoration Program (IRP).« less

  11. Installation-Restoration Program. Preliminary assessment; records search for the 155th Tactical Reconnaissance Group, Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-11-01

    The Hazardous Materials Technical Center (HMTC) was retained in May 1986 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment (PA) - Records Search for the 155th Tactical Reconnaissance Group (TRG), Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska (hereinafter referred to as the Base). The Records Search included: an onsite visit including interviews with 19 Base personnel conducted by HMTC personnel on 21-23 May 1986; the acquisition and analysis of pertinent information and records on hazardous materials use and hazardous-waste generation and disposal at the Base; the acquisition and analysis of available geologic, hydrologic, meteorologic, and environmental data frommore » pertinent Federal, State, and local agencies; and the identification of sites on the Base that may be potentially contaminated with hazardous materials/hazardous wastes (HM/HW).« less

  12. Superfund record of decision (EPA Region 9): Aircraft Control and Warning Site, Mather Air Force Base, CA, December 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This decision document, a Record of Decision (ROD), presents the selected remedial action for the AC W Site, Installation Restoration Program (IRP) Site 12, at Mather Air Force Base (AFB), Sacramento County, California. Reports indicate that from 1958 to 1966 waste solvents and transformer oils were disposed in a waste disposal pipe in the AC W area. Investigations conducted as part of the Air Force Installation Restoration Program (IRP) failed to locate the waste disposal pipe but did find trichloroethylene (TCE) contamination in the shallow water bearing zone (SWBZ) in the AC W area. The SWBZ is classified as amore » potential source of drinking water by the State of California, although it is not currently used in the AC W area. The selected remedy will address the potential threat to human health posed by TCE contamination in groundwater (primarily in the SWBZ).« less

  13. Preliminary assessment report for Bee Caves Armory (former Nike BG-80 Fire Control Facility), Installation 48055, Austin, Texas. Installation Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, C.

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment.more » This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.« less

  14. Development of a portable teleoperated robot for the manipulation of a backhoe shovel for the restoration of disaster-stricken sites

    NASA Astrophysics Data System (ADS)

    Tanaka, Toshihiko; Sakai, Yosiharu; Konomi, Yosiyuki; Chayama, Kazuhiro; Minamoto, Masahiko; Matsunaga, Katsuya

    1999-11-01

    Restoration activities after disasters such as landslides or rock avalanches require rapid action, but in fact, in most cases these activities are very inefficient because of the danger of secondary disasters. A system which can operate reconstruction machinery by remote control was therefore developed, and it was installed on general-purpose construction machines (backhoe shovels). Control performance experiments and field experiments on this developed system were carried out, and its effectiveness was confirmed.

  15. Engineering and Development Support of General Decon Technology for the U.S. Army’s Installation Restoration Program. Task 1. Literature Review on Ground Water Containment and Diversion Barriers.

    DTIC Science & Technology

    1982-04-01

    number) This report presents a review and evaluation of the available information on the use of physical and hydrological barriers for containment or...UNCLASSIFIED 1 $SCCuRITY CLASSIFICATION OF T.qiS *&GE When Daa Entered SUMMARY The available literature on methods for containment or diversion of ground...II. Preliminary Considerations for Installation of a Ground Water Containment or Diversion Barrier .. ... ....... ...... 13 III. Slurry-Trench Cutoff

  16. [Identification of the party responsible for restoring the water quality according to the German Potable Water Act in buildings belonging to a semiautonomous condominium community].

    PubMed

    Hecker, R M

    2017-02-01

    When drinking water contaminations occur in installations belonging to a semiautonomous condominium community ( Wohnungseigentumsgemeinschaft ) and the water installation's final paths being owned by the various condominium owners, the German legal definition of the party responsible has a broad reach. Therefore, authorities should address the condominium community, the condominium owners and the community administrator ( WEG-Verwalter ). © Georg Thieme Verlag KG Stuttgart · New York.

  17. Installation Restoration Program Stage 3. Remedial Investigation/ Feasibility Study Elmendorf AFB, Alaska. Volume 2. Section 5 - Bibliography Text

    DTIC Science & Technology

    1990-05-01

    ELME’IDORF AFB, AK UNITED STATES AIR FORCE OCCUPATIONAL & ENVIRONMENTAL HEALTH LABORATORY (AFSC) ilb(. IiCAL Sr.(VICES DIVISION (AFOEHLi £3) I BROOKS AIR...UNITED STATES AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL HEALTH LABORATORY (AFSC) TECHNICAL SERVICES DIVISION (AFOEHL/TS) BROOKS AIR FORCE BASE, TEXAS...the following criteria: technical feasibility, institutional requirements, environmental impacts, public health impacts, and cost. This Alternative

  18. Installation Restoration General Environmental Technology Development. Task 6. Materials Handling of Explosive Contaminated Soil and Sediment.

    DTIC Science & Technology

    1985-06-01

    of chemical analysis and sensitivity testing on material samples . At this 4 time, these samples must be packaged and...preparation at a rate of three samples per hour. One analyst doing both sample preparation and the HPLC analysis can run 16 samples in an 8-hour day. II... study , sensitivity testing was reviewed to enable recommendations for complete analysis of contaminated soils. Materials handling techniques,

  19. Installation Restoration Program. Phase I. Records Search, Reese, AFB, Texas.

    DTIC Science & Technology

    1984-06-01

    engineering in flue - gas desulfurization plants, and corrosion asaessinnto of hazardous waste handling systems. Mr. Ellis is or has been an active participant...provean to evaluate lime- stones as wet scrubbers in flue gas desulfurisatios (VS) system. She vas task leader for the chemical ad physical analysis...11109163A-15 Debra L. lichmann PUBLIC&TIOUSIlEPOITS: lichmann, D.L., K.V. Luke, end J.C. Terry, " Flue Gas Desulfurization Chemistry Studies

  20. Method for in-situ restoration of plantinum resistance thermometer calibration

    DOEpatents

    Carroll, Radford M.

    1989-01-01

    A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or strain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's.

  1. Method for in-situ restoration of platinum resistance thermometer calibration

    DOEpatents

    Carroll, R.M.

    1987-10-23

    A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or stain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's. 1 fig.

  2. Functional Tooth Restoration by Allogeneic Mesenchymal Stem Cell-Based Bio-Root Regeneration in Swine

    PubMed Central

    Wei, Fulan; Song, Tieli; Ding, Gang; Xu, Junji; Liu, Yi; Liu, Dayong; Fan, Zhipeng; Zhang, Chunmei

    2013-01-01

    Our previous proof-of-concept study showed the feasibility of regenerating the dental stem cell-based bioengineered tooth root (bio-root) structure in a large animal model. Here, we used allogeneic dental mesenchymal stem cells to regenerate bio-root, and then installed a crown on the bio-root to restore tooth function. A root shape hydroxyapatite tricalcium phosphate scaffold containing dental pulp stem cells was covered by a Vc-induced periodontal ligament stem cell sheet and implanted into a newly generated jaw bone implant socket. Six months after implantation, a prefabricated porcelain crown was cemented to the implant and subjected to tooth function. Clinical, radiological, histological, ultrastructural, systemic immunological evaluations and mechanical properties were analyzed for dynamic changes in the bio-root structure. The regenerated bio-root exhibited characteristics of a normal tooth after 6 months of use, including dentinal tubule-like and functional periodontal ligament-like structures. No immunological response to the bio-roots was observed. We developed a standard stem cell procedure for bio-root regeneration to restore adult tooth function. This study is the first to successfully regenerate a functional bio-root structure for artificial crown restoration by using allogeneic dental stem cells and Vc-induced cell sheet, and assess the recipient immune response in a preclinical model. PMID:23363023

  3. The need for complementary hydraulic analysis in post-restoration monitoring of river restoration projects

    NASA Astrophysics Data System (ADS)

    Endreny, T. A.; Soulman, M. M.

    2011-03-01

    River restoration design methods are incrementally improved by studying and learning from monitoring data in previous projects. In this paper, we report post-restoration monitoring data for a Natural Channel Design (NCD) restoration project along 1600 m (10 channel wavelengths) of the Batavia Kill in the Catskill Mountains, NY, implemented in 2001 and 2002. The NCD project used a reference-reach to determine channel form, empirical relations between the project site and reference site bankfull dimensions to size channel geometry, and hydraulic and sediment computations to test channel capacity and sediment stability. In addition 12 cross-vanes and 48 j-hook vanes used in NCD for river training were installed to protect against bank erosion and maintain scour pools for fish habitat. Changes in pool depths were monitored with surveys from 2002-2004, and then after the channel-altering April 2005 flood. Aggradation in pools was attributed to cross-vane arms not concentrating flow in the center of the channel, which subsequently caused flow splitting and 4 partial point bar avulsions during the 2005 flood. Hydrodynamic simulation at the 18 m3s-1 bankfull flow suggested avulsions occurred where vanes allowed erosive bank scour to initiate the avulsion cut, and once the flow was split, the diminished in-channel flow caused more aggradation in the pools. In this project post-restoration monitoring had detected aggradation and considered it a problem. The lesson for the larger river restoration community is monitoring protocol should include complementary hydraulic and sediment analysis to comprehend potential consequences and develop preventative maintenance. River restoration and monitoring teams should be trained in robust hydraulic and sediment analytical methods that help them extend project restoration goals.

  4. Quantifying geomorphic change at ephemeral stream restoration sites using a coupled-model approach

    USGS Publications Warehouse

    Norman, Laura M.; Sankey, Joel B.; Dean, David; Caster, Joshua J.; DeLong, Stephen B.; Henderson-DeLong, Whitney; Pelletier, Jon D.

    2017-01-01

    Rock-detention structures are used as restoration treatments to engineer ephemeral stream channels of southeast Arizona, USA, to reduce streamflow velocity, limit erosion, retain sediment, and promote surface-water infiltration. Structures are intended to aggrade incised stream channels, yet little quantified evidence of efficacy is available. The goal of this 3-year study was to characterize the geomorphic impacts of rock-detention structures used as a restoration strategy and develop a methodology to predict the associated changes. We studied reaches of two ephemeral streams with different watershed management histories: one where thousands of loose-rock check dams were installed 30 years prior to our study, and one with structures constructed at the beginning of our study. The methods used included runoff, sediment transport, and geomorphic modelling and repeat terrestrial laser scanner (TLS) surveys to map landscape change. Where discharge data were not available, event-based runoff was estimated using KINEROS2, a one-dimensional kinematic-wave runoff and erosion model. Discharge measurements and estimates were used as input to a two-dimensional unsteady flow-and-sedimentation model (Nays2DH) that combined a gridded flow, transport, and bed and bank simulation with geomorphic change. Through comparison of consecutive DEMs, the potential to substitute uncalibrated models to analyze stream restoration is introduced. We demonstrate a new approach to assess hydraulics and associated patterns of aggradation and degradation resulting from the construction of check-dams and other transverse structures. Notably, we find that stream restoration using rock-detention structures is effective across vastly different timescales.

  5. Rotational joint for prosthetic leg

    NASA Technical Reports Server (NTRS)

    Jones, W. C.; Owens, L. J.

    1977-01-01

    Device is installed in standard 30 millimeter tubing used for lower leg prosthetics. Unit allows proper rotation (about 3 degrees) of foot relative to the hip, during normal walking or running. Limited rotational movement with restoring force results in a more natural gait.

  6. Electromagnetically levitated vibration isolation system for the manufacturing process of silicon monocrystals

    NASA Technical Reports Server (NTRS)

    Kanemitsu, Yoichi; Watanabe, Katsuhide; Yano, Kenichi; Mizuno, Takayuki

    1994-01-01

    This paper introduces a study on an Electromagnetically Levitated Vibration Isolation System (ELVIS) for isolation control of large-scale vibration. This system features no mechanical contact between the isolation table and the installation floor, using a total of four electromagnetic actuators which generate magnetic levitation force in the vertical and horizontal directions. The configuration of the magnet for the vertical direction is designed to prevent any generation of restoring vibratory force in the horizontal direction. The isolation system is set so that vibration control effects due to small earthquakes can be regulated to below 5(gal) versus horizontal vibration levels of the installation floor of up t 25(gal), and those in the horizontal relative displacement of up to 30 (mm) between the floor and levitated isolation table. In particular, studies on the relative displacement between the installation floor and the levitated isolation table have been made for vibration control in the horizontal direction. In case of small-scale earthquakes (Taft wave scaled: max. 25 gal), the present system has been confirmed to achieve a vibration isolation to a level below 5 gal. The vibration transmission ratio of below 1/10 has been achieved versus continuous micro-vibration (approx. one gal) in the horizontal direction on the installation floor.

  7. Influence of forces acting on side of machine on precision machining of large diameter holes

    NASA Astrophysics Data System (ADS)

    Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.

    2018-03-01

    One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.

  8. Installation Restoration Program for Richards-Gebaur AFB. Phase 2. Field Evaluation

    DTIC Science & Technology

    1983-12-01

    of the Phase I--Records Search. "ýThe specific task was to determine whether environmental contamination of groundwater or surface water had resulted...concentrations (4 and 5 ug/L, respectively) which exceeded the Missouri Water Quality Standards for groundwater (I ug/L). A limited followup study was...contamination of groundwater and surface water had resulted from waste handling and disposal at two ’and- fills on Richards-Gebaur Air Force Base (AFB

  9. Implant-supported single-tooth restorations. A 12-year prospective study.

    PubMed

    Donati, Mauro; Ekestubbe, Annika; Lindhe, Jan; Wennström, Jan L

    2016-10-01

    The aim of this study was to evaluate prospectively the 12-year outcome of implant-supported single-tooth restorations. Originally 45 self-tapping Astra Tech TiOblast ® ST-implants were installed by a two-stage protocol in 40 subjects requiring single-tooth prosthetic replacement for a missing tooth. Clinical and radiologic examinations were performed at completion of the prosthetic treatment 4-7 months after implant installation surgery and after 5 and 12 years in function. At 12 years 31 patients and 35 implants were available for evaluation. The overall failure rate after 12 years was 10.3% on the subject level and 9.1% on the implant level. The mean bone loss amounted to 0.67 mm (SD 2.20) on a subject level and 0.47 mm (1.72) on an implant level. Three subjects (10%) and three implants (8.6%) were diagnosed with peri-implantitis. Five subjects had experienced technical complications; three incidences of loosening of the abutment retention screw during the first 5 years and two minor porcelain fracture of the crown (two patients) between 5- and 12-years of follow-up. The findings reported in this 12-year prospective case series suggest that the use of the Astra Tech dental implants may be a valid treatment alternative for single-tooth replacement prostheses. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  10. 32 CFR 202.12 - Administrative support and eligible expenses.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...

  11. 32 CFR 202.12 - Administrative support and eligible expenses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...

  12. 32 CFR 202.12 - Administrative support and eligible expenses.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...

  13. 32 CFR 202.12 - Administrative support and eligible expenses.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...

  14. 32 CFR 202.12 - Administrative support and eligible expenses.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...

  15. Assessment of Composting Feasibility at Army Installations

    DTIC Science & Technology

    2008-09-01

    The end product is a contaminant-free humus that can enhance landscaping and horticultural applications. Composting costs considerably less than...grasses, flowers, and trees by becoming the humus . Original wetland plants can be restored with the use of compost during planting. Compost provides

  16. Installation Restoration Program Preliminary Assessment Granite Mountain Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    the mountain. Within the vicinity of Granite Mountain Pluton, these rocks are characteristically hornfelsic and propylitically altered to a hard, pale...uncorrupted; unspoiled. PROPYLITICAL - Pertaining to or resembling propylite , a hydrothermally altered andestic. PYROXENE - A group of dark rock-forming

  17. History of the restoration of adenovirus type 4 and type 7 vaccine, live oral (Adenovirus Vaccine) in the context of the Department of Defense acquisition system.

    PubMed

    Hoke, Charles H; Snyder, Clifford E

    2013-03-15

    Respiratory pathogens cause morbidity and mortality in US military basic trainees. Following the influenza pandemic of 1918, and stimulated by WWII, the need to protect military personnel against epidemic respiratory disease was evident. Over several decades, the US military elucidated etiologies of acute respiratory diseases and invented and deployed vaccines to prevent disease caused by influenza, meningococcus, and adenoviruses. In 1994, the Adenovirus Vaccine manufacturer stopped its production. By 1999, supplies were exhausted and adenovirus-associated disease, especially serotype 4-associated febrile respiratory illness, returned to basic training installations. Advisory bodies persuaded Department of Defense leaders to initiate restoration of Adenovirus Vaccine. In 2011, after 10 years of effort by government and contractor personnel and at a cost of about $100 million, the Adenovirus Vaccine was restored to use at all military basic training installations. Disease and adenovirus serotype 4 isolation rates have fallen dramatically since vaccinations resumed in October 2011 and remain very low. Mindful of the adage that "The more successful a vaccine is, the more quickly the need for it will be forgotten.", sustainment of the supply of the Adenovirus Vaccine may be a challenge, and careful management will be required for such sustainment. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. In silico comparison of the reproducibility of full-arch implant provisional restorations to final restoration between a 3D Scan/CAD/CAM technique and the conventional method.

    PubMed

    Mino, Takuya; Maekawa, Kenji; Ueda, Akihiro; Higuchi, Shizuo; Sejima, Junichi; Takeuchi, Tetsuo; Hara, Emilio Satoshi; Kimura-Ono, Aya; Sonoyama, Wataru; Kuboki, Takuo

    2015-04-01

    The aim of this article was to investigate the accuracy in the reproducibility of full-arch implant provisional restorations to final restorations between a 3D Scan/CAD/CAM technique and the conventional method. We fabricated two final restorations for rehabilitation of maxillary and mandibular complete edentulous area and performed a computer-based comparative analysis of the accuracy in the reproducibility of the provisional restoration to final restoration between a 3D scanning and CAD/CAM (Scan/CAD/CAM) technique and the conventional silicone-mold transfer technique. Final restorations fabricated either by the conventional or Scan/CAD/CAM method were successfully installed in the patient. The total concave/convex volume discrepancy observed with the Scan/CAD/CAM technique was 503.50mm(3) and 338.15 mm(3) for maxillary and mandibular implant-supported prostheses (ISPs), respectively. On the other hand, total concave/convex volume discrepancy observed with the conventional method was markedly high (1106.84 mm(3) and 771.23 mm(3) for maxillary and mandibular ISPs, respectively). The results of the present report suggest that Scan/CAD/CAM method enables a more precise and accurate transfer of provisional restorations to final restorations compared to the conventional method. Copyright © 2014 Japan Prosthodontic Society. Published by Elsevier Ltd. All rights reserved.

  19. Installation-restoration program. Phase 2. Confirmation/quantification. Stage 1 for Mather AFB, Sacramento, California. Volume 1. Final report, September 1983-June 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    A Problem Confirmation Study was performed at three sites on Mather AFB identified in the Phase I investigation as requiring further study (the Air command and warning Area, the 7100 Area, the West Ditch) and the Northeast Perimeter. The field investigation was conducted from February 1984 to June 1985 and included installation of 11 monitor wells, collection of groundwater samples from the monitor wells and 15 base production wells, and collection of sediment samples from two locations on the West Ditch. Analytes included oil and grease, TOC, volatile organic compounds (VOA), as well as dimethylnitrosamine, phenols, pesticides, and dissolved metalsmore » at some specific sites. Based on the hydrogeologic complexity of the physical setting and the findings of the sampling and analytical work, follow-on investigations were recommended at all three sites.« less

  20. Installation Restoration Program. Phase I. Records Search, Grand Forks Air Force Base, North Dakota.

    DTIC Science & Technology

    1985-04-01

    and Liability Act . (CERCLA) of 1980, Executive Order 12316, and 40 CFR 300 Subpart F O* (National Oil and Hazardous Substances Contigency Plan...response action on USAF installations under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as...COMBAT ICBT, OPSRA1ON$ MAINI’IPAIICE MAKGIMEIE WPPloTn GROP OIEGRO UP FIOSPITAL, 441 SM)tsU SUPLY 14O SIC 2 SP 447 SM S o u R M I3 1 1 5 E EE2 TENANT

  1. Adaptive Optics Image Restoration Based on Frame Selection and Multi-frame Blind Deconvolution

    NASA Astrophysics Data System (ADS)

    Tian, Yu; Rao, Chang-hui; Wei, Kai

    Restricted by the observational condition and the hardware, adaptive optics can only make a partial correction of the optical images blurred by atmospheric turbulence. A postprocessing method based on frame selection and multi-frame blind deconvolution is proposed for the restoration of high-resolution adaptive optics images. By frame selection we mean we first make a selection of the degraded (blurred) images for participation in the iterative blind deconvolution calculation, with no need of any a priori knowledge, and with only a positivity constraint. This method has been applied to the restoration of some stellar images observed by the 61-element adaptive optics system installed on the Yunnan Observatory 1.2m telescope. The experimental results indicate that this method can effectively compensate for the residual errors of the adaptive optics system on the image, and the restored image can reach the diffraction-limited quality.

  2. The mindful nurse leader: Improving processes and outcomes; restoring joy to nursing.

    PubMed

    Pipe, Teri; FitzPatrick, Kate; Doucette, Jeffrey N; Cotton, Amy; Arnow, Debra

    2016-09-01

    In this first installment of a three-part series on mindfulness, we describe a dynamic project aimed at elevating the importance of mindfulness, compassion, and presence as key competencies for professional nurses across the career span in all healthcare settings.

  3. 14 CFR 21.335 - Responsibilities of exporters.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...

  4. 14 CFR 21.335 - Responsibilities of exporters.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...

  5. 14 CFR 21.335 - Responsibilities of exporters.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...

  6. 14 CFR 21.335 - Responsibilities of exporters.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...

  7. Engineering and Development Support of General Decon Technology for the U.S. Army’s Installation Restoration Program. Task 11. Composting of Explosives

    DTIC Science & Technology

    1982-09-01

    parallei studies ý7.fLtoring TNT and liDX disappearance in laboratory scale (50 g dry weight) and greenhouse (10 kg dry weight) compost,. An additional...occurred during composting. The greenhouse compost studies demonstrated a very rapid decrease in the TNT concentration. At the three week sampling time...material was below the detecuion limit of 16.9 ppm. Greenhouse composting of RDX resulted in a 61% reduction in the RDX concentration after three weeks

  8. Habitat Restoration on Mobile Bay

    NASA Astrophysics Data System (ADS)

    Murphy, B.

    2017-12-01

    Alabama has some of the most biodiversity found anywhere in our nation, however we are rapidly losing many of these species to habitat loss. Our marine science class realized our shoreline on our campus on Mobile Bay was disappearing and wanted to help. We collaborated with local scientists from Dauphin Island Sea Lab under the direction of Dr. Just Cebrian and our instructor, Dr. Megan McCall, to create a project to help restore the habitat. We had to first collect beach profile surveys and learn how to measure elevations. Next we installed plants that we measured and collected growth data. Our project went through a series of prototypes and corrective measures based on the type of wave energy we discovered on our shores. Finally we landed on a type of wave attenuator of crab traps filled with rock and staked into the sand. This coming year we will begin collecting data on any changes to the beach profile as well as fish counts to evaluate the effectiveness of our installation.

  9. Installation of C-6533(XE-2)/ARC ICS in UH-1H helicopter

    NASA Astrophysics Data System (ADS)

    Hnat, J. A.

    1980-07-01

    This report documents the results of the installation of the C-6533(XE-2)/ARC ICS in UH-1H helicopter. Installation was performed at the AEL, Inc., Monmouth County Airport facility. Design of each installation was coordinated and approved by the Government. The mechanical and electrical installation drawings for the helicopter are attached as Appendix A of this report. The new ICS system consisted of new cabling, new intercoms and helmets rewired with new microphones. All four crew stations of the helicopter were reconfigured with the new system. Existing cabling for the standard ICS system remained in the aircraft but was securely stowed for later restoration of the aircraft. The helmets (4) were rewired using separate jacks for headphones and microphone lines. Transmit and receive cables were installed in the aircraft with a minimum separation of one inch between cables. A junction box was fabricated and installed on the aft end of the console to house the fan-out terminal strips. Transmit and receive lines' separation was maintained in the junction box. During the test phase the onboard radios were used with the new ICS system.

  10. Scientific and technical complex for modeling, researching and testing of rocket-space vehicles’ electric power installations

    NASA Astrophysics Data System (ADS)

    Bezruchko, Konstantin; Davidov, Albert

    2009-01-01

    In the given article scientific and technical complex for modeling, researching and testing of rocket-space vehicles' power installations which was created in Power Source Laboratory of National Aerospace University "KhAI" is described. This scientific and technical complex gives the opportunity to replace the full-sized tests on model tests and to reduce financial and temporary inputs at modeling, researching and testing of rocket-space vehicles' power installations. Using the given complex it is possible to solve the problems of designing and researching of rocket-space vehicles' power installations efficiently, and also to provide experimental researches of physical processes and tests of solar and chemical batteries of rocket-space complexes and space vehicles. Scientific and technical complex also allows providing accelerated tests, diagnostics, life-time control and restoring of chemical accumulators for rocket-space vehicles' power supply systems.

  11. Problem Definition Studies on Potential Environmental Pollutants. 6. Preliminary Assessment of Environmental Effects of Seven Substances Used in Pyrotechnic Compositions at Pine Bluff Arsenal

    DTIC Science & Technology

    1979-11-01

    on reveryo if nec.,ary and identify by block number) FIELD GROUP SUB-GROUP Benzanthrone, 1-Methylaminoanthraquinone, Pyrotechnics 24 03 .uramine, 1,4...necessary and identify by block number) Procurement data for the period 1965-1975 are used to estimate soil contaminatior by pyrotechnic and smoke...Project Manager for Chemical Demilitarization and Installation Restoration, has identified an initial list of substances (Table 1) requiring assessment

  12. Installation Restoration Program. Operable Unit B1 Remedial Investigation/Feasibility Study. Appendices

    DTIC Science & Technology

    1993-06-30

    agency (California Health and Safety Code [H&SC], Section 25179.6[a][2]). 1.2.5 Porter-Cologne Water Quality Act and Related Policies The Porter-Cologne...which endangers the comfort, repose, and health and safety of the public. SMAQMD Rule 403 requires that all reasonable precautions be taken not to cause...concentration values on Figures C-1 through C-IO. Differences in soil physical parameters, listed in Table C-2 for different compounds were questiotned

  13. Installation Restoration Program. Phase II Stage I Study McGuire Air Force Base, Burlington County, New Jersey.

    DTIC Science & Technology

    1984-10-01

    risk level.derive human health criteria. Most evaluation and synthesis. Scientific SurmyofteJlrc &2criteria are based solely on exposure judg~~nt was...State drinking water and human health standards, criteria, and guidelines applica- ble in the State of New Jersey. On November 28, 1980, the U.S...established recommended maximum concentrations for acute and chronic exposure to these pollutants by both humans and aquatic life. The derivation of these

  14. Installation Restoration Program. Phase II. Problem Confirmation and Quantification Study, Griffiss Air Force Base, Rome, New York.

    DTIC Science & Technology

    1982-12-01

    Base 6-26 17 Confirmation Stage Soil PCB Data, Building 112, Griffiss Air Force Base 6-27 18 Analysis of Roof and Oil Samples Building 112, Griffiss...Chlordane Application 46 52 (14) Drywell, Building 219 46 36 (14) PCB Spill at Floyd 46 47 17 Hazardous Waste Storage Area, Lot 69 38 47 18 Waste Oil ...specific anions, oil and grease, pH, and specific conductance. * Prepare a field investigations report delineating the nature and magnitude of

  15. Denitrification and Phosphorus Sequestration in Restored Oyster Beds in the Indian River Lagoon, Florida, USA

    NASA Astrophysics Data System (ADS)

    Gallagher, S. M.; Schmidt, C. A.; Walters, L.

    2016-12-01

    In 2016, an algae bloom in the St. Lucie River in Florida led the governor to declare a state of emergency. The river is part of a connected system of estuaries along the Atlantic coast of Florida called the Indian River Lagoon (IRL). As with many estuaries around the world, nutrient loading in the IRL has led to periodic eutrophication. As a result, much research has been done to address nutrients in these systems. Previous estuary studies have related oyster restoration to denitrification and phosphorus sequestration in their bed sediment. To this point, these studies have been inconclusive, and have only focused on seasonal variation in nutrient cycling. In 2007, yearly oyster bed installation and restoration began in a study area in the IRL. By 2016, beds aged up to eleven years were available for sampling. This unique advantage allowed investigation of bed sediment and nutrient cycling over long periods of time. Sediment from the IRL was measured for organic matter, microbial weight, carbon, nitrogen, and phosphorus. Denitrification was measured using an acetylene block technique. A statistical analysis was used to find differences in sediment characteristics and denitrification between restored beds and control sites over time. In addition, sequencing of 16S rRNA DNA and a variety of denitrifying genes was used to identify bacterial species and their denitrifying capability in the sediment. The ability to sequence denitrification genes in established oyster beds over a period of years was also unique to this study. Significant differences were found in soil properties, denitrification rates, and phosphorus sequestration between control sites and restored oyster beds. Gene sequencing also found differences in bacterial populations between the sites. Oyster bed restoration resulted in a rapid increase in nutrient removal as beds developed over three years, but additional benefits were limited as restoration progressed further. This study adds an investigation of IRL oysters to existing knowledge of nutrient removal by oysters in other estuaries. These results help clarify single year studies focused on seasonal changes by showing a rapid increase in oyster bed nutrient removal over a period of three years.

  16. Letter of Concern from EPA to Mr. Terry A. Yonkers, Assistant Administrator for Installations, Environment, and Logistics, USAF, Concerning Cleanup at Tyndall AFB, FL

    EPA Pesticide Factsheets

    Letter from EPA's Assistant Administrator for Enforcement and Compliance Assurance expresses concern over Tyndall Air Force Base's August 19, 2010, Memorandum on Environmental Restoration Program Progress at Tyndall AFB, FL.

  17. Installation Restoration Program Records Search for McEntire Air National Guard Base Eastover, South Carolina

    DTIC Science & Technology

    1984-01-01

    from the north, thereby occasionally encouraging unseasonably warm temperatures. Unseasonably cold temperatures most often occur when the Bermuda...marl. Hawthorn 160 - Sandy phophatic marl and soft limestone with interbedded brittle -shale. 25 OLIGOCENE (Ta) Flint River 50 - Reddish-yellow sand

  18. Installation Restoration Program Records Search for Alaska DEW Line Stations

    DTIC Science & Technology

    1982-06-01

    Chlorinate hydrocarbons Radar components Calgon corrosion inhibitor 55 gallon drums (empty) Lye Lime Corrosives Antifreeze Paper Wood Plastics AVGAS...Factor Subsoare A I Persistence Vcor * Subaccro a C. Appl~y "yicaJ. state =iLtipiisr Sub•coce 3 X Physical State Mltipler - Waste Caracteristics

  19. Growing season soil moisture following restoration treatments of varying intensity in semi-arid ponderosa pine forests

    NASA Astrophysics Data System (ADS)

    O'Donnell, F. C.; Springer, A. E.; Sankey, T.; Masek Lopez, S.

    2014-12-01

    Forest restoration projects are being planned for large areas of overgrown semi-arid ponderosa pine forests of the Southwestern US. Restoration involves the thinning of smaller trees and prescribed or managed fire to reduce tree density, restore a more natural fire regime, and decrease the risk of catastrophic wildfire. The stated goals of these projects generally reduced plant water stress and improvements in hydrologic function. However, little is known about how to design restoration treatments to best meet these goals. As part of a larger project on snow cover, soil moisture, and groundwater recharge, we measured soil moisture, an indicator of plant water status, in four pairs of control and restored sites near Flagstaff, Arizona. The restoration strategies used at the sites range in both amount of open space created and degree of clustering of the remaining trees. We measured soil moisture using 30 cm vertical time domain reflectometry probes installed on 100 m transects at 5 m intervals so it would be possible to analyze the spatial pattern of soil moisture. Soil moisture was higher and more spatially variable in the restored sites than the control sites with differences in spatial pattern among the restoration types. Soil moisture monitoring will continue until the first snow fall, at which point measurements of snow depth and snow water equivalent will be made at the same locations.

  20. The Installation Restoration Program Toxicology Guide. Volume 5

    DTIC Science & Technology

    1990-11-01

    biological systems may not differentiate metals on a basis other than oxidation state. In essence , this results in a specific function (e.g. intracellular...biological exposure Indices. 5th ed. Cincinnati, Ohio, pp. 422-426 (as cited in 6206). 6368. Jasmin , G. 1973. Experimental production of polycythcmia in

  1. SUPERFUND TREATABILITY CLEARINGHOUSE: ENGINEERING AND DEVELOPMENT SUPPORT OF GENERAL DECON TECHNOLOGY FOR THE U.S. ARMY'S INSTALLATION/RESTORATION PROGRAM

    EPA Science Inventory

    This document reports on the results of bench-scale tests of treatment technologies for explosive-containing sediment located in lagoons at Army ammunition plants. A companion literature search identified the appropriate explosives remediation technologies to be evaluated. ...

  2. Ecosystem biomass, carbon, and nitrogen five years after restoration with municipal solid waste

    USDA-ARS?s Scientific Manuscript database

    Escalating municipal solid waste generation coupled with decreasing landfill space needed for disposal has increased the pressure on military installations to evaluate novel approaches to handle this waste. One approach to alleviating the amount of municipal solid waste being landfilled is the use o...

  3. 32 CFR 202.11 - Documenting RAB activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Documenting RAB activities. 202.11 Section 202.11 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS RESTORATION ADVISORY BOARDS Operating Requirements § 202.11 Documenting RAB activities. (a) The installation shall document information...

  4. Installation Restoration Program Records Search for Dobbins Air Force Base, Georgia

    DTIC Science & Technology

    1982-04-01

    migation Death to irond water ____________ lift ogaeiitation 1 . Subsurface flow_____I a _____________ Direct aess W 4round water______ j Submrs(10 x actr...potential pathways, surface water migation , flooding, and ground-water * migration. Select the highest rating, and proceed to C. f 1. Surface water migration

  5. 32 CFR 203.18 - Conflict of interest and disclosure requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Conflict of interest and disclosure requirements... ENVIRONMENTAL RESTORATION ACTIVITIES § 203.18 Conflict of interest and disclosure requirements. The Department... bid or proposal: (a) Information on its financial and business relationship with the installation, RAB...

  6. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Kirtland AFB, New Mexico

    DTIC Science & Technology

    1981-11-01

    Additional ferns, including Eaton lip fern, occur on shady granite outcroppings. Reveechon three-awn, Scribner needlegrass, noseburn, bear grass, banana ...torrey rush, and smooth monkey flower are among the more obvious plants in this area. Arroyos and seasonally intermittent streams support other

  7. Evaluation of Receiving Water Improvements from Stream Restoration (Accotink Creek, Fairfax City, VA)

    EPA Science Inventory

    Installation of best management practices (BMPs) in watersheds or streams is widely used as a means of reducing, eliminating, or controlling the input of human-based physical, chemical, or hydrologic stressors to those systems. Although BMPs may be effective in managing a partic...

  8. USE OF DRILLING FLUIDS IN MONITORING WELL NETWORK INSTALLATION: LANL AND OPEN DISCUSSION

    EPA Science Inventory

    Personnel at the EPA Ground Water and Ecosystems Restoration Division (GWERD) were requested by EPA Region 6 to provide a technical analysis of the impacts of well drilling practices implemented at the Los Alamos National Laboratory (LANL) as part of the development of their grou...

  9. Predicting velocity in bendway weir eddy fields

    Treesearch

    Kristoph-Dietrich Kinzli; Christopher I. Thornton

    2010-01-01

    Rehabilitation of the Middle Rio Grande (MRG) in central New Mexico has become necessary because of changes in morphology resulting from the installation of dams, and because of habitat restoration considerations for the endangered Rio Grande silvery minnow (Hybognathus amarus). Bendway weirs are erosion control and channel-stabilization structures placed transverse to...

  10. Installation Restoration Program. Phase 2. Confirmation McClellan AFB, California. Volume 1

    DTIC Science & Technology

    1983-06-01

    testing in accordance with ASTH C 828-78 and in conformance with CAL/ OSHA safety orders and ES Industrial Sewer Entry Procedures. Indi- viduals entering...Liquid Palm Cil Wastes," Proceedings: Asia Acuatech, Singapore, Malaysia , March 1980 (Coauthors R. White and C. Ponniah). "Surface Impoundment of

  11. Installation Restoration Program. Phase I. Records Search. Vandenberg Air Force Base, California.

    DTIC Science & Technology

    1984-12-01

    acidity or alkalinity POL Petroleum, oils, and lubricants PVC Polyvinyl chloride plastic RCRA Resource Conservation and Recovery Act RP-1 Rocket propellant...multiplter: Subscore 3 K ?hvsical State ulriptier Waste Caracteristics Subscore 50 X 1 50 11-1. CS-I HAZARD ASSESSMENT RATING METHODOLOGY FORM (Continued

  12. Restoration in Sand-slugged Streams and Drought---the Granite Creeks Project.

    NASA Astrophysics Data System (ADS)

    Lake, P. S.; Bond, N.; Glaister, A.; Downes, B.

    2005-05-01

    European settlement, with accompanying land clearance and heavy grazing, of the Strathbogie Ranges in central Victoria, Australia, resulted in the massive export of sediment to lowland streams. These streams, originally configured as "chains of ponds", were filled with "sand slugs" that generated a raised flat streambed depleted in habitat heterogeneity. The invertebrate fauna of the sand slugs is similar to that of sandbed streams elsewhere, but lacks an abundant hyporheos. The fish fauna was reduced in diversity and abundance. In 2001 habitat restoration in the sand slugs commenced after pre-restoration samples were taken.Timber structures, made from railway sleepers, were installed and subsequently created scour pools. Fish responded positively to restoration measure, but no significant effect was apparent for the invertebrates. In 2001-2004 a very severe drought occurred causing the streams to cease to flow and in the sand-slugged sections faunal abundance declined greatly due to the loss of residential habitat and the lack of refugia. Thus, the large-scale effects of severe drought thwarted the effects of localized habitat restoration, stressing the point that in restoring habitat it is also imperative to generate resilience to the prevailing disturbance regime-a regime that may be exacerbated by human activities.

  13. 7-Years of Using Distributed Temperature Sensing (DTS) to assess river restoration efforts : synergies of high-resolution observation and modeling on the Middle Fork of the John Day River

    NASA Astrophysics Data System (ADS)

    Hall, A.; Diabat, M.

    2014-12-01

    Temperature is a key factor for salmonid health and is an important restoration metric on the Middle Fork of the John Day River, northeast Oregon. The longest undammed tributary to the Columbia, the headwaters of the Middle Fork are crucial to steelhead and spring Chinook and summer Chinook juvenile rearing. In the past century the river has been altered by dredge mining, overgrazing, logging activities, and irrigation resulting in bank erosion, low effective shade, and channelization. These factors decreased fish habitat and led to increased stream temperature maxima. Restoration has focused on restoring fish habitat, creating thermal refugia, and planting native vegetation. The most recent completed restoration project diverted the flow into the historic, meandering stream channel from the dredged, straightened channel. Over the past seven years, Oregon State University researchers (Tara O'Donnell-2012, Julie Huff-2009) have been involved in a planned-to-be 10-year stream temperature monitoring study to assess maximum temperatures during low-flow summer months. The use of fiber optics through distributed temperature sensing (DTS) made it possible to record high resolution temperature data at both temporal and spatial scales; data which is used to assess the efficacy of restoration efforts on the reach. Furthermore, DTS provided temperature data that reveals subtle hydrologic processes such as groundwater or hyporheic inflows and quantifies their effect on the stream. Current research has focused on large scale DTS installations on the Middle Fork of the John Day River on the Oxbow, Forrest, and the upstream Galena ("RPB") conservation properties. In the summers of 2013 and 2014, 16 km of river were monitored. Our study compares temperatures before and after the restoration project and provides essential guidance for future restoration projects. Direct comparisons coupled with a deterministic modeling using HeatSource assist in better understanding the responsiveness of the stream to restoration. Results showed that reconstructing the stream channel influenced stream temperature as a function of modifying channel geometry, hydraulics, and riparian conditions. Special attention in this work is focused on the role of tributary fans in the creation of distributed cold-water emergences.

  14. The Corps of Engineers and Prairie Restoration: Synopsis of the First Corps Prairie Workshop, Follow-up Actions, and Thoughts on the Future of Prairie Restoration and Management on Operational Projects

    DTIC Science & Technology

    2009-06-01

    Corps super- vision regarding management practices such as cropping systems and cattle grazing. Also, the Corps’ focus at the time was on tree planting...on crop rotation and removal of grazing. Changes included the installation of 100-ft-wide warm-season native grass strips between each agricultural...brood-rearing habitat, but it was not always possible to put that much land aside. Idle fields consisted of 5- to 15-acre blocks centered in row crop

  15. U.S. Department of Energy worker health risk evaluation methodology for assessing risks associated with environmental restoration and waste management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blaylock, B.P.; Legg, J.; Travis, C.C.

    1995-06-01

    This document describes a worker health risk evaluation methodology for assessing risks associated with Environmental Restoration (ER) and Waste Management (WM). The methodology is appropriate for estimating worker risks across the Department of Energy (DOE) Complex at both programmatic and site-specific levels. This document supports the worker health risk methodology used to perform the human health risk assessment portion of the DOE Programmatic Environmental Impact Statement (PEIS) although it has applications beyond the PEIS, such as installation-wide worker risk assessments, screening-level assessments, and site-specific assessments.

  16. Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St. Hilaire, Danny R.

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and,more » more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.« less

  17. Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Volkman, Jed

    2005-12-01

    In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reportingmore » period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.« less

  18. Installation Restoration Program. Phase I - Records Search 92nd Bombardment Wing (Heavy), Fairchild AFB, Washington.

    DTIC Science & Technology

    1985-01-01

    a pavillion with a snack bar, six cabins, eight recreational vehicle camping sites with electrical -- hookup only, a covered picnic area, and a small...solidification. Lava: The material extruded by a volcano which consists of molten or part- molten silicate material. Leachate: A solution resulting from

  19. Environmental Assessment for Renovation and Small Addition for AGE Facility MacDill AFB, Florida

    DTIC Science & Technology

    2005-05-01

    one lift station, all of the sanitary sewer lines have, in essence , at least one check valve to stop the inflow of floodwater to the WWTP. The...Force Base Installation Restoration Program 7621 Hillsborough Loop Dr. MacDill AFB, FL 33621-5207 Jasmine Raffington FL Coastal Management

  20. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 3.

    DTIC Science & Technology

    1988-02-05

    EOCENE: Strata of the Tertiary era, between the Paleocene and Oligocene , lasting from 60 to 40 million years before the present. EPA: U.S. Environmental...for warm storage). The person who returns the sample will place his signature and date in the appropriate space on the check-out list. Sample Control

  1. Installation Restoration Program. Phase 1: Records Search, Whiteman AFB, Missouri

    DTIC Science & Technology

    1984-03-26

    Aquazene (Ciba-Geigy) was added to each remote site lagoon (A-i through N-i) on a one-time basis as an algicide . Brine line leakage has been noted at...layered strata are inclined down and away from the axes. AQUAZENE: an algicide . ARRS: Aerospace Rescue and Recovery Squadron. ARTESIAN: Ground water

  2. Installation Restoration Program. Phase 1: Records Search, Pope Air Force Base, North Carolina

    DTIC Science & Technology

    1985-05-01

    Diazinon Calcium Cyanide A-Dust Pramitol 25E Mayforce Rodeo PZ 270 Dursban Fungicides Prograss PZ 250 Baygon Weed Hoe 108 Unicorn Fogging Solution Benlate...head; the direction in which ground water flows. I DPDO: Defense Property Disposal Office, previously included Redistri- bution and Marketing (R&M

  3. Installation Restoration Program Records Search for Moody Air Force Base, Georgia.

    DTIC Science & Technology

    1983-02-01

    Mocap, and Chlordane ( termite control only). Ochemcomp and anticoagulants are commonly used for rodent control. The major herbicides currently used are...buried in 10 55-gallon drums in 1971. A single pit was excavated about 6 to 8 feet deep, and the filled hole was capped with a clayey-sand mound to

  4. 32 CFR 202.9 - Conducting RAB meetings.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... public will have a designated time on the agenda to speak to the RAB committee as a whole. (b) Nature of...) MISCELLANEOUS RESTORATION ADVISORY BOARDS Operating Requirements § 202.9 Conducting RAB meetings. (a) Public participation. RAB meetings shall be open to the public. (1) The installation co-chair shall prepare and publish...

  5. AmeriFlux US-Myb Mayberry Wetland

    DOE Data Explorer

    Baldocchi, Dennis [University of California, Berkeley

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-Myb Mayberry Wetland. Site Description - The Mayberry Wetland site is a 300-acre restored wetland on Sherman Island, north of Mayberry Slough, that is on the property of Mayberry Farms and managed by the California Department of Water Resources and Ducks Unlimited. During Summer 2010, the site was restored from a pepperweed and annual grassland pasture to a wetland through a project managed by Bryan Brock (bpbrock@water.ca.gov). A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on October 14, 2010. At the time of installation, flooding of the site had only recently begun after extensive reconstruction of the wetland bathymetry conducted during the summer. Although some small patches of tules remain within the site, the site is a patchwork of deep and shallow open water with some remaining vegetation. Currently, there is an intention to flood-to-kill the current pepperweed and upland grasses and let the wetland plants propagate naturally, so no additional plant manipulation will occur.

  6. Hot Cell Installation and Demonstration of the Severe Accident Test Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linton, Kory D.; Burns, Zachary M.; Terrani, Kurt A.

    A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examinemore » postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.« less

  7. Installation Restoration Program Stage 3. Remedial Investigation/ Feasibility Study, Elmendorf AFB, Alaska. Volume 1. Sections 1-4, Text

    DTIC Science & Technology

    1990-05-01

    DISSOLVED INORGANIC 4-16 CONSTITUENTS IN GROUNDWATER TABLE 4.1.8 CANCER CAUSING POTENTIAL OF CONTAMINATION 4-18 DETECTED AT ELMENDORF APB TABLE 4.1.9...TABLE 5-34 EXAMPLE CALCMATION OF EXCESS LIFETIME CANCER RISK 5-142 I DUE TO EXPOSURE TABLE 5-35 CONTAMINATION AND RISKS AT SITE IS-1 5-145 TABLE 5-36...sand. They occur on low terraces and in broad depressions . Slopes range from zero to 7 percent. o The Purches series consists of loamy-skeletal, mixed

  8. U.S. Air Force Installation Restoration Program. Phase 1. Records Search for Suffolk County Air Force Base (Retired) Landfills 1 and 2. Suffolk County Airport, Westhampton Beach, New York.

    DTIC Science & Technology

    1987-09-20

    of the two study sites (Appendix D). Common species include the herring and ring-billed gull, mourning dove, tree swallow, chimney swift, purple... Species ................... 111-30 III.G ADJACENT LAND USE .................................... 111-31 III.H SUMMARY OF ENVIRONMENTAL FEATURES...methodology, and a list of acronyms/abbreviations used in this report. 1-4 W- x--WW- -- vqwu UV X DECISION TREE Complete List of Locations/Sites I Evaluation

  9. Final Quality Assurance Project Plan, Installation Restoration Program Remedial Investigation/Feasibility Study, Kotzebue Long Range Radar Station, Alaska. Volume 2

    DTIC Science & Technology

    1994-10-01

    right side door. To minimize retinal exposure to UV, use UV protective eyeglasses and use the offset dental mirror to read the micrometer 6.7.4.3 To...States Air Force) Volatiles Analysis by GC/MS Method 8260 - (United States Air Force) Organochlorine Pesticides and PCBs by GC/ECD Method 8081...decreasing throughout the three or four exposures . The RSD will sometimes be higher than normal in these cases. Samples that are affected by possible carry

  10. A case study in innovative outreach--combining training, research, and technology transfer to address real-world problems.

    PubMed Central

    Chang, D P

    1998-01-01

    Outreach, training, technology transfer, and research are often treated as programmatically distinct activities. The interdisciplinary and applied aspects of the Superfund Basic Research Program offer an opportunity to explore different models. A case study is presented that describes a collaborative outreach effort that combines all of the above. It involves the University of California's Davis and Berkeley program projects, the University of California Systemwide Toxic Substances Research and Teaching Program, the U.S. Navy's civilian workforce at the former Mare Island Naval Shipyard, Vallejo, California (MINSY), a Department of Defense (DoD) Environmental Education Demonstration Grant program, and the Private Industry Council of Napa and Sonoma counties in California. The effort applied a Superfund-developed technology to a combined waste, radium and polychlorinated biphenyl contamination, stemming from a problematic removal action at an installation/restoration site at MINSY. The effort demonstrates that opportunities for similar collaborations are possible at DoD installations. PMID:9703494

  11. 3D Printing/Additive Manufacturing Single Titanium Dental Implants: A Prospective Multicenter Study with 3 Years of Follow-Up

    PubMed Central

    2016-01-01

    This prospective 3-year follow-up clinical study evaluated the survival and success rates of 3DP/AM titanium dental implants to support single implant-supported restorations. After 3 years of loading, clinical, radiographic, and prosthetic parameters were assessed; the implant survival and the implant-crown success were evaluated. Eighty-two patients (44 males, 38 females; age range 26–67 years) were enrolled in the present study. A total of 110 3DP/AM titanium dental implants (65 maxilla, 45 mandible) were installed: 75 in healed alveolar ridges and 35 in postextraction sockets. The prosthetic restorations included 110 single crowns (SCs). After 3 years of loading, six implants failed, for an overall implant survival rate of 94.5%; among the 104 surviving implant-supported restorations, 6 showed complications and were therefore considered unsuccessful, for an implant-crown success of 94.3%. The mean distance between the implant shoulder and the first visible bone-implant contact was 0.75 mm (±0.32) and 0.89 (±0.45) after 1 and 3 years of loading, respectively. 3DP/AM titanium dental implants seem to represent a successful clinical option for the rehabilitation of single-tooth gaps in both jaws, at least until 3-year period. Further, long-term clinical studies are needed to confirm the present results. PMID:27313616

  12. 3D Printing/Additive Manufacturing Single Titanium Dental Implants: A Prospective Multicenter Study with 3 Years of Follow-Up.

    PubMed

    Tunchel, Samy; Blay, Alberto; Kolerman, Roni; Mijiritsky, Eitan; Shibli, Jamil Awad

    2016-01-01

    This prospective 3-year follow-up clinical study evaluated the survival and success rates of 3DP/AM titanium dental implants to support single implant-supported restorations. After 3 years of loading, clinical, radiographic, and prosthetic parameters were assessed; the implant survival and the implant-crown success were evaluated. Eighty-two patients (44 males, 38 females; age range 26-67 years) were enrolled in the present study. A total of 110 3DP/AM titanium dental implants (65 maxilla, 45 mandible) were installed: 75 in healed alveolar ridges and 35 in postextraction sockets. The prosthetic restorations included 110 single crowns (SCs). After 3 years of loading, six implants failed, for an overall implant survival rate of 94.5%; among the 104 surviving implant-supported restorations, 6 showed complications and were therefore considered unsuccessful, for an implant-crown success of 94.3%. The mean distance between the implant shoulder and the first visible bone-implant contact was 0.75 mm (±0.32) and 0.89 (±0.45) after 1 and 3 years of loading, respectively. 3DP/AM titanium dental implants seem to represent a successful clinical option for the rehabilitation of single-tooth gaps in both jaws, at least until 3-year period. Further, long-term clinical studies are needed to confirm the present results.

  13. A Case Study on Nitrogen Uptake and Denitrification in a ...

    EPA Pesticide Factsheets

    Restoring urban infrastructure and managing the nitrogen cycle represent emerging challenges for urban water quality. We investigated whether stormwater control measures (SCMs), a form of green infrastructure, integrated into restored and degraded urban stream networks can influence watershed nitrogen loads. We hypothesized that hydrologically connected floodplains and SCMs are “hot spots” for nitrogen removal through denitrification because they have ample organic carbon, low dissolved oxygen levels, and extended hydrologic residence times. We tested this hypothesis by comparing nitrogen retention metrics in two urban stream networks (one restored and one urban degraded) that each contain SCMs, and a forested reference watershed at the Baltimore Long-Term Ecological Research site. We used an urban watershed continuum approach which included sampling over both space and time with a combination of: (1) longitudinal reach-scale mass balances of nitrogen and carbon conducted over 2 years during baseflow and storms (n = 24 sampling dates × 15 stream reaches = 360) and (2) 15N push–pull tracer experiments to measure in situ denitrification in SCMs and floodplain features (n = 72). The SCMs consisted of inline wetlands installed below a storm drain outfall at one urban site (restored Spring Branch) and a wetland/wet pond configured in an oxbow design to receive water during high flow events at another highly urbanized site (Gwynns Run). The SCMs significantly d

  14. Sampling and Chemical Analysis Quality Assurance Requirements for the Navy Installation Restoration Program

    DTIC Science & Technology

    1988-06-01

    Mencer Mitzi S. Miller Dist J. W. Zolyniak Prepared by the Oak Ridge Gaseous Diffusion Plant Oak Ridge, Tennessee 37831 operated by MARTIN MARIETTA...Drop A20 S Oak Ridge, TN 37830 * Mailing Address for Regular Mail: Martin Marietta Energy Systems, Inc. P.O. Box 2003 Oak Ridge, TN 37831-7440 Mitzi

  15. Installation Restoration Program. Phase 1. Records Search for the 167th Tactical Airlift Group, Shepherd Field Air National Guard Base, Martinsburg, West Virginia. Revised.

    DTIC Science & Technology

    1986-03-01

    Evaluation of Past Operations ] at Listed Sites Contamination Delee StesPotential for I De’ere tesI Migrationl S Potential for IOther N Environmental... Microbiology , New Orleans. Louisiana. March 1983. Effect of particles on degradation of bromobenzene in a simulated groundwater environment

  16. Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows

    DTIC Science & Technology

    2017-07-01

    greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health

  17. Installation Restoration Program. Preliminary Assessment for the 153rd Tactical Airlift Group, Wyoming Air National Guard, Cheyenne Municipal Airport, Cheyenne, Wyoming

    DTIC Science & Technology

    1988-03-01

    Cheyenne area is characterized by semi-arid conditions and large diurnal and annual temperature changes. The summers are generally warm with humidity...contaminants through pathways (groundwater, surface water, soil, and air). MIOCENE - An epoch of the upper Tertiary period, after the Oligocene and before the

  18. Installation Restoration Program. Preliminary Assessment: 115th Tactical Control Squadron, Hall Air National Guard Station, Alabama Air National Guard, Dothan, Alabama.

    DTIC Science & Technology

    1991-02-01

    Department of Agriculture (USDA): Soil Conservation Service, February 1968). Houston County is characterized by a warm and humid climate that borders...Figur I..,1 PhUTogrpER Map. of theAre 111-2 3. EXPLANATION - Residuum -~ l Citronelle Formation Catahouia Sandstone Paynes Hammock 0 Oligocene

  19. Serb guardrail in-service evaluation : S. Ashland to California State Line, F.A.P. IR-5-1(113)00, Jackson County : experimental features construction-report.

    DOT National Transportation Integrated Search

    1990-03-01

    This report covers the installation of two Self-Restoring Barrier (SERB) guardrails on Interstate-5 south of Ashland Oregon. The SERB design was developed to reduce repair cost and increase safety when compared to conventional barriers. This is accom...

  20. Installation Restoration Program. Remedial Investigation Report. Volk Field Air National Guard, Camp Douglas, Wisconsin. Volume 1.

    DTIC Science & Technology

    1993-09-01

    Surface Area Contacted Per Event SB soil boring Sb Antimony SD sediment sample SDG Sample Delivery Group SDWA Safe Drinking Water Act Se Selenium sec second...and were laid out using a Brunton compass and measuring tape. The station locations were gridded at intervals of 25 feet. Measurements indicating the

  1. Using simple structures for flow dispersion in wet meadow restoration

    Treesearch

    Bill Zeedyk; Benjamin Romero; Steven K. Albert

    1996-01-01

    Historically, wet meadow recovery projects have relied on heavy earth moving equipment to harden nick points and install gully plugs or terraces to trap and detain sediments. We experimented with a variety of simple hand-built structures fashioned of logs, rocks, geotextile fabrics and/or sandbags designed to disperse runoff, rewet surface and subsurface soils and...

  2. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1. Chanute Air Force Base, Rantoul, Illinois. Volume 1.

    DTIC Science & Technology

    1986-10-01

    Kaskaskia to the southwest, the Embarras to the south and the Vermilion to the southeast. Surface flow from the Base is ultimately conveyed to the Wabash ...of this characterization showed that arsenic, cadmium , chromium, lead, mercury, selenium, and silver were all below detection limits. The only EP TOX

  3. Installation Restoration Program. Preliminary Assessment: 186th Tactical Reconnaissance Group, Mississippi Air National Guard, Meridian Airport, Key Field, Meridian, Mississippi

    DTIC Science & Technology

    1988-10-01

    previous directives and meoranda. Although the DOD IRP and the USEPA Superfund pr"gr ware essentially the sase, differences in the definition of progr...Midway and Wilcox inJ Mississimp, Bulletin 102, Mississippi Geologic Research Papers, Mississippi Geological, Ecnomic and Toporapic Survey, 1964. 16

  4. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  5. SWSA 6 interim corrective measures environmental monitoring: FY 1990 results. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwood, T.L.; Spalding, B.P.

    1991-07-01

    This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levelsmore » in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.« less

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    This document summarizes the performance of the groundwater restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the sixth year of system operation, from December 1, 2009, until November 30, 2010. In the project at Utica, the CCC/USDA is cooperating with multiple state and federal agencies to remove carbon tetrachloride contamination from a shallow aquifer underlying the town and to provide supplemental treated groundwater for use in the restoration of a nearby wetlands area. Argonne National Laboratory has assisted the CCC/USDA by providingmore » technical oversight for the aquifer restoration effort and facilities during this review period. This document presents overviews of the aquifer restoration facilities (Section 2) and system operations (Section 3), then describes groundwater production results (Section 4), groundwater treatment results (Section 5), and associated groundwater monitoring, system modifications, and costs during the review period (Section 6). Section 7 summarizes the present year of operation. Performance prior to December 1, 2009, has been reviewed previously (Argonne 2005, 2006, 2008, 2009a, 2010).« less

  7. Evaluating impacts using a BACI design, ratios, and a Bayesian approach with a focus on restoration.

    PubMed

    Conner, Mary M; Saunders, W Carl; Bouwes, Nicolaas; Jordan, Chris

    2015-10-01

    Before-after-control-impact (BACI) designs are an effective method to evaluate natural and human-induced perturbations on ecological variables when treatment sites cannot be randomly chosen. While effect sizes of interest can be tested with frequentist methods, using Bayesian Markov chain Monte Carlo (MCMC) sampling methods, probabilities of effect sizes, such as a ≥20 % increase in density after restoration, can be directly estimated. Although BACI and Bayesian methods are used widely for assessing natural and human-induced impacts for field experiments, the application of hierarchal Bayesian modeling with MCMC sampling to BACI designs is less common. Here, we combine these approaches and extend the typical presentation of results with an easy to interpret ratio, which provides an answer to the main study question-"How much impact did a management action or natural perturbation have?" As an example of this approach, we evaluate the impact of a restoration project, which implemented beaver dam analogs, on survival and density of juvenile steelhead. Results indicated the probabilities of a ≥30 % increase were high for survival and density after the dams were installed, 0.88 and 0.99, respectively, while probabilities for a higher increase of ≥50 % were variable, 0.17 and 0.82, respectively. This approach demonstrates a useful extension of Bayesian methods that can easily be generalized to other study designs from simple (e.g., single factor ANOVA, paired t test) to more complicated block designs (e.g., crossover, split-plot). This approach is valuable for estimating the probabilities of restoration impacts or other management actions.

  8. Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1988

    DTIC Science & Technology

    1989-03-01

    63 6 1 17 36 IOWA 3 49 49 0 3 7 0 0 1 5 IDAHO 15 34 34 0 2 10 0 0 1 5 ILLINOIS 14 140 131 6 12 34 1 1 10 15 INDIANA 12 122 119 0 4 39 3 0 3 7 KANSAS 8...4 4 IOWA TOTALS 49 0 3 7 0 0 1 5 IDAHO ARMY ARCO AEC SITE 1 BONNEVILLE 1 BROKEN KETTLE TRAINING AREA 1 BUHL 1 GOODING I GOWEN FIELD 1 HALLEY 1 IDAHO ... IDAHO TOTALS 34 0 2 10 0 0 1 5 B- 13 Table B-2 DEPARTMENT OF DEFENSE ENVIRONMENTAL RESTORATION PROGRAM State by State Installation Status Listing (As

  9. United States Air Force 611th Civil Engineer Squadron, Elmendorf AFB, Alaska. Final engineering evaluation/cost analysis: Petroleum, oil, and lubricants area, Galena Airport, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-05

    This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).

  10. Installation Restoration Program. Remedial Investigation Report. Minnesota Air National Guard Base Duluth International Airport, Duluth, Minnesota. Volume 5

    DTIC Science & Technology

    1990-01-01

    1-20 1-6 Sites Defined and Ranked During IRP Phase I Study. 1-29 1-7 Aerial Photograph of Site 2, April 1988. 1-32 1-8 Site 2 Sampling Locations...Utilized During Phase II Investigations. 1-35 1-9 Aerial Photograph of Site 3, April 1988. 1-38 1-10 Site 3 Sampling Locations Utilized During Phase II...Investigations. 1-47 1-11 Aerial Photograph of Site 4, April 1988. 1-54 1-12 Site 4 Sampling Locations Utilized During Phase II Investigations. 1-57 1-13

  11. Installation Restoration Program. Phase 1. Records Search, Pease AFB, New Hampshire

    DTIC Science & Technology

    1984-01-01

    Kevin Hopkins, RCRA Permits, 603/271-4622 4. New Hampshire Water Supply and Pollution Control Commission Industrial Waste Division Concord, New...LPapilatiou syed try s=u-aca waer ~ sply wi-:n3 n±il" _wY!s=*aof _________ T. Pow"",- sacrped byT qr-’dý-was SCW17 Sublectais kcup%==subacr

  12. Installation Restoration Program Records Search for McClellan Air Force Base, California.

    DTIC Science & Technology

    1981-07-01

    waterweed (Elodea spp.), button snakeroot (Eryngium aristulatum), quillwort (Isoetes howellii), water purslane (Ludwigia palustris), pillwort...persicaria Curly dock Rumex crispus Portulacaceae Purslane family Red maids Calandrinia ciliata Miner’s lettuce Montia perfoliata Common purslane Portulaca...marine and continental sedimentary rock which contains saline or brackish water. These rocks are impermeable and form the bottom of the basin, with

  13. Installation Restoration Program. Phase 1. Records Search, Selfridge Air National Guard Base, Mount Clemens, Michigan

    DTIC Science & Technology

    1983-04-01

    Honorary Fraternity Gamma Eta Chapter- Secretary A-12 JAMES F. BRAITHWAITE, P.E. QUALIFICATIONS SUIMIARY PRINCIPAL James Braithwaite is Executive Vice...X factor Score subtotaLd/aaius .Me aubtOtal .7 C. oigmast pathway mabe "cre. l t~ thi ghest sabfoe Valueoo a. S-1. 9 -2 at 0-3 aboe. pathaysSubeorv

  14. Installation Restoration Program Records Search for 132 Tactical Fighter Wing, Iowa Air National Guard, Des Moines Municipal Airport.

    DTIC Science & Technology

    1983-09-01

    underlain by soils of the Gravity series and " of the Wabash -Gravity-Nodaway complex. These soils, primarily silty clay loams, are formed in fine...Electric Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- S cadmium batteries (24/year) and sulfuric

  15. Installation Restoration Program. Remedial Investigation Report. Site 1. Fire Training Area. Volk Field Air National Guard Base, Camp Douglas, WI. Volume 1

    DTIC Science & Technology

    1990-07-01

    Nitroaniline 4-Nitroaniline N-Nitroso-di-n-butylamine N-Nitrosopiperidine Pentachlorobenzene Pentachloronitrobenzene Phenacetin 2- Picoline Pronarnide 1,2,4,5... chromium . Cu: Chemical symbol for copper. 3 DARCY’S LAW: An equation describing the flow of fluids in porous media based on the assumption that the flow

  16. Installation Restoration Program. Preliminary Assessment: 118th Tactical Airlift Wing Tennessee Air National Guard, Nashville International Airport, Nashville, Tennessee

    DTIC Science & Technology

    1988-12-01

    disseminated silt and shale partings. The unit is medium-bedded and is characterized by numerous fossils of the brachiopod Resseralla fertilis . The... runoff from the Base is collected by the storm sewer system and discharged to McCrory Creek (Figure 6). The confluence of McCrory Creek and the Stone

  17. Installation of an artificial vegetating island in oligomesotrophic Lake Paro, Korea.

    PubMed

    Seo, Eun-Young; Kwon, Oh-Byung; Choi, Seung-Ik; Kim, Ji-Ho; Ahn, Tae-Seok

    2013-01-01

    After cut off of inflowing water, Lake Paro, an oligomesotrophic lake lost littoral zone, an important region for the aquatic ecosystem. For the first step of restoration, the artificial vegetation island was installed. The concentration of nutrients in lake water was not sufficient for the growth of macrophyte as total phosphate was ranged from 58 to 83 μg L(-1). In order to overcome this problem, the hydrophobic substratum for bacterial attachment was selected as buoyant mat material of the artificial vegetation island. In this medium, total phosphate and total nitrogen were ranged from 190 to 1,060 μg L(-1) and from 4.9 to 9.1 mg L(-1), respectively. These concentrations were high enough for macrophytes growth. After launching 1,800 m(2) of AVI in Lake Paro, the macrophytes, Iris pseudoacorus and Iris ensata, grew well after five years of launching without the addition of fertilizer. Furthermore, fishes were plentiful under the artificial vegetation island, and ducks were observed on the artificial vegetation island. Bacteria using sunlight as energy source and self-designed ecotechnology can be used as an alternative method for the restoration of disturbed littoral zone in oligo-mesotrophic lakes.

  18. Installation of an Artificial Vegetating Island in Oligomesotrophic Lake Paro, Korea

    PubMed Central

    Seo, Eun-Young; Kwon, Oh-Byung; Choi, Seung-Ik; Kim, Ji-Ho; Ahn, Tae-Seok

    2013-01-01

    After cut off of inflowing water, Lake Paro, an oligomesotrophic lake lost littoral zone, an important region for the aquatic ecosystem. For the first step of restoration, the artificial vegetation island was installed. The concentration of nutrients in lake water was not sufficient for the growth of macrophyte as total phosphate was ranged from 58 to 83 μg L−1. In order to overcome this problem, the hydrophobic substratum for bacterial attachment was selected as buoyant mat material of the artificial vegetation island. In this medium, total phosphate and total nitrogen were ranged from 190 to 1,060 μg L−1 and from 4.9 to 9.1 mg L−1, respectively. These concentrations were high enough for macrophytes growth. After launching 1,800 m2 of AVI in Lake Paro, the macrophytes, Iris pseudoacorus and Iris ensata, grew well after five years of launching without the addition of fertilizer. Furthermore, fishes were plentiful under the artificial vegetation island, and ducks were observed on the artificial vegetation island. Bacteria using sunlight as energy source and self-designed ecotechnology can be used as an alternative method for the restoration of disturbed littoral zone in oligo-mesotrophic lakes. PMID:23935437

  19. Tidal freshwater wetland herbivory in Anacostia Park

    USGS Publications Warehouse

    Krafft, Cairn; Hatfield, Jeff S.; Hammerschlag, Richard S.

    2010-01-01

    Herbivory has played a major role in dictating vegetation abundance and species composition at Kingman Marsh in Anacostia Park, Washington, D.C., since restoration of this tidal freshwater wetland was initiated in 2000. In June 2009 an herbivory study was established to document the impacts of resident Canada goose (Branta canadensis maxima) herbivory to vegetation at Kingman Marsh. Sixteen modules consisting of paired exclosed plots and unfenced control plots were constructed. Eight of the modules were installed in vegetated portions of the restoration site that had been protected over time by fencing, while the remaining eight modules were placed in portions of the site that had not been protected over time and were basically unvegetated at the start of the experiment. Since the experiment was designed to determine the impacts of herbivory by resident Canada geese as opposed to other herbivores, exclosure fencing was elevated 0.2 m to permit access by herbivores such as fish and turtles while excluding mature Canada geese. Repeated measures analysis of variance (ANOVA) was used to analyze the differences between paired exclosure and control plots for a number of variables including total vegetative cover. Differences in total vegetative cover were not significant for the baseline data collected in June. By contrast, two months after the old protective fencing was removed from the initially-vegetated areas to allow Canada geese access to the control plots, total vegetative cover had declined dramatically in the initially-vegetated control plots, and differences between paired exclosed and control plots were significant (P = 0.0026). No herbivory by Canada geese or other herbivores such as fish or turtles was observed in the exclosures. These results show that Canada goose herbivory has inflicted significant damage to the native wetland vegetation in the portions of Kingman Marsh that had been refenced and replanted. Significant differences in total vegetative cover were limited to the eight modules installed in areas already vegetated by previous restoration efforts and protected until the start of the study, suggesting that areas of Kingman that are essentially devoid of vegetation would take longer than a growing season to show signs of improvement once goose herbivory impacts have been reduced.

  20. Self-potential investigations of a gravel bar in a restored river corridor

    USGS Publications Warehouse

    Linde, N.; Doetsch, J.; Jougnot, D.; Genoni, O.; Durst, Y.; Minsley, B.J.; Vogt, T.; Pasquale, N.; Luster, J.

    2011-01-01

    Self-potentials (SP) are sensitive to water fluxes and concentration gradients in both saturated and unsaturated geological media, but quantitative interpretations of SP field data may often be hindered by the superposition of different source contributions and time-varying electrode potentials. Self-potential mapping and close to two months of SP monitoring on a gravel bar were performed to investigate the origins of SP signals at a restored river section of the Thur River in northeastern Switzerland. The SP mapping and subsequent inversion of the data indicate that the SP sources are mainly located in the upper few meters in regions of soil cover rather than bare gravel. Wavelet analyses of the time-series indicate a strong, but non-linear influence of water table and water content variations, as well as rainfall intensity on the recorded SP signals. Modeling of the SP response with respect to an increase in the water table elevation and precipitation indicate that the distribution of soil properties in the vadose zone has a very strong influence. We conclude that the observed SP responses on the gravel bar are more complicated than previously proposed semi-empiric relationships between SP signals and hydraulic head or the thickness of the vadose zone. We suggest that future SP monitoring in restored river corridors should either focus on quantifying vadose zone processes by installing vertical profiles of closely spaced SP electrodes or by installing the electrodes within the river to avoid signals arising from vadose zone processes and time-varying electrochemical conditions in the vicinity of the electrodes. ?? 2011 Author(s).

  1. Self-potential investigations of a gravel bar in a restored river corridor

    USGS Publications Warehouse

    Linde, N.; Doetsch, J.; Jougnot, D.; Genoni, O.; Durst, Y.; Minsley, Burke J.; Vogt, T.; Pasquale, N.; Luster, J.

    2011-01-01

     Self-potentials (SP) are sensitive to water fluxes and concentration gradients in both saturated and unsaturated geological media, but quantitative interpretations of SP field data may often be hindered by the superposition of different source contributions and time-varying electrode potentials. Self-potential mapping and close to two months of SP monitoring on a gravel bar were performed to investigate the origins of SP signals at a restored river section of the Thur River in northeastern Switzerland. The SP mapping and subsequent inversion of the data indicate that the SP sources are mainly located in the upper few meters in regions of soil cover rather than bare gravel. Wavelet analyses of the time-series indicate a strong, but non-linear influence of water table and water content variations, as well as rainfall intensity on the recorded SP signals. Modeling of the SP response with respect to an increase in the water table elevation and precipitation indicate that the distribution of soil properties in the vadose zone has a very strong influence. We conclude that the observed SP responses on the gravel bar are more complicated than previously proposed semi-empiric relationships between SP signals and hydraulic head or the thickness of the vadose zone. We suggest that future SP monitoring in restored river corridors should either focus on quantifying vadose zone processes by installing vertical profiles of closely spaced SP electrodes or by installing the electrodes within the river to avoid signals arising from vadose zone processes and time-varying electrochemical conditions in the vicinity of the electrodes.

  2. The Installation Restoration Program Toxicology Guide. Volume 1

    DTIC Science & Technology

    1989-07-01

    affinity for adipose tissue , which is more prevalent in women and would result in less unchanged chloroform and more carbon dioxide exhaled. This...magnesium, potassium, sodium, tin, zinc , and their alloys. ADI Acceptable daily intake ADL Arthur D. Little, Inc. Adenocarcinoma A malignant tumor...originating in glandular or ductal epithelium. Adenoma A benign growth of glandular tissue . ae Acid equivalent Aerosol A suspension or dispersion of small

  3. Installation Restoration Program. Phase I. Records Search. New Boston Air Force Station, New Hampshire.

    DTIC Science & Technology

    1985-07-01

    Shall not impose water uses, unless naturally occurring (generally ɘ.015 mg/l) Gross Beta Radioactivity <,000 picocuries/liter (pCi/l) Str nt till 9J...trace - Chlorine "s chloride ..... _47.0 35.0 H-rdness 5.2 , 94 Iron .... __0.10 4,.70 Copper Lead Pheno l,k~.Iinlty ____ ______ __ ______ To t a I_" Mung

  4. Installation Restoration Program Records Search for Luke Air Force Base, Arizona.

    DTIC Science & Technology

    1982-06-01

    These soils were formed in recent alluvium derived from a wide mixture of rock type, including andesite, basalt , schist, rhyolite, and granite-gneiss...were originally derived from granite, granite- gneiss, schist, andesite, basalt , and limestone. Permeability is moderate (same as Gilman series...alluvium is the crystalline rock, granite, granite-gneiss, anyolite, schist, andesite, basalt , and limestone, which eroded from the mountains, and were

  5. Installation Restoration Program Records Search for Davis-Monthan Air Force Base, Arizona.

    DTIC Science & Technology

    1982-08-01

    inspection labs, and corrosion -2- control shops. These industrial operations generate varying quantities of waste oils , fuels , *solvents, and cleaners. The...standard procedures for the disposition of the majority of the waste oils , fuels , solvents, and cleaners has been (1) fire department training...and corrosion control shops. These industrial operations generate varying quantities of waste oils , fuels , solvents, and cleaners. The total quantity

  6. Installation Restoration Program Phase 1 - Records Search, O’Hare Air Reserve Forces Facility, Illinois

    DTIC Science & Technology

    1983-12-01

    clarifiers, activated sludge units, trickling filters, aerobic and anaerobic digesters, and various dowatering devices and recommendations for...for locations of water- bearing fractures. Additional responsibilities included drilling with mud and air rotary drilling rigs as well as bucket auger...interpretation. Also conducted earth resistivity surveys in Georgia and Alabama Piedmont Provinces for locations of water- bearing fractures. Additional

  7. Installing an Ethics Pledge within K-12 Academia: A Restoration of Humanism

    ERIC Educational Resources Information Center

    McBath, Gabrielle

    2012-01-01

    In May 2009, 33 Harvard M.B.A. Candidates proposed and published an ethics pledge entitled the M.B.A. Oath. It is a "voluntary student-led pledge that the goal of business managers is to 'serve the greater good.' It promises that Harvard M.B.A.[s] will act responsibly, ethically, and refrain from advancing their 'own narrow ambitions' at the…

  8. Environmental Assessment Deicer Recovery at Grand Forks AFB, North Dakota

    DTIC Science & Technology

    2004-12-15

    Air Force Base (AFB), North Dakota. Contacts: 319 CES/CEVA 525 Tuskegee Airmen Boulevard (Blvd) Grand Forks AFB, ND...ACRONYMS, ABBREVIATIONS, AND TERMS AAM Annual Arithmetic Mean ACM Asbestos Containing Material AFB Air Force Base AFI Air Force Instruction AICUZ...meter 10 GFAFB Grand Forks Air Force Base HAP Hazardous Air Pollutants hr Hour H2S Hydrogen Sulfide IRP Installation Restoration

  9. Installation Restoration Program. Phase I. Records Search for Air Force Reserve and Air National Guard Facilities at General Billy Mitchell Field, Milwaukee, Wisconsin.

    DTIC Science & Technology

    1984-11-01

    quantities of vegetative grco th thr¢cu:ho r ts area. Infiltration of runoff and drainage waLers wuuld o icu n . this area. 3.3.2 SurfEa:- Waer Quality...Wisconsin 608-266-7809 Kevin Kessler Groundwater Coordinator Wisconsin Department of Natural Resources Madison, Wisconsin 608-267-9350 Frank Schultz

  10. Identification of Critical Biological Parameters Affecting Gastrointestinal Absorption

    DTIC Science & Technology

    1990-01-01

    invention that may in any way be related thereto. Please do not request copies of this report from the Harry G. Armstrong Aerospace Medical Research...BALLINGER, Lt Col, USAF, BSC Chief, Toxic Hazards Division Harry G. Armstrong Aerospace Medical Research Laboratory UNCLASSIFIED SECURITY CLASSIFICATION OF...involved in a very large task of hazard management through its Installation Restoration Program. The pioneering efforts of the Armstrong Aerospace

  11. The Installation Restoration Program Toxicology Guide. Volume 2

    DTIC Science & Technology

    1989-07-01

    producing substance. Carcinoma A malignant epithelial tumor. CAS REG NO Numeric designation assigned by the A.~’erican Chemical Socecty’s Chemica ...violent, exothermic, and capable of causing violent rupture of sealed containers. ABBREVIATIONS AB-I1 Polymerization A chemica reaction, usually carried...a deleterious effect on the taste and/or odor of human food derred from aquatic environments cannot be discharged into inland surface waters

  12. Installation Restoration Program, Phase II (Stage 2-1). Volume 2.

    DTIC Science & Technology

    1985-05-01

    Worthington OH PAGES: 89 SOURCE: Radian Library COMMENTS: General manual for well drilling, sample collection . Includes good elementary background. FIRST... Collected from the Base Industrial and Domestic Waste Water Treatment Plants and Field * Sampling Data PAGES: 75 p. SOURCE: Capt. Mario Ierarti * COMMENTS...Analytical results for samples collected from the * base industrial and domestic wastewater treatment plants have been included. RADIAN FIRST AUTHOR

  13. Installation Restoration Program. Phase II - Confirmation/Quantification. Stage 1 for American Lake Garden Tract, Washington.

    DTIC Science & Technology

    1985-12-20

    Kalles . 1976. Evaporation rates of methylene chloride, chloroform, 1,1,1-trichloroethane, trichloroethylene, tetrachoroethylene, and other chlorinated...State University (1969) M.S., Geology, University of Washington ( 1971 ) . . Ph.D., University of Washington (1979) " EXPERIENCE 1984 to Date Senior...ducted environmental assessments for Pacific Northwest construc- tion projects. L- 1971 Project Geologist, SEREM of Alaska (BRGM-France). Responsibil

  14. The Installation Restoration Program Toxicology Guide. Volume 4

    DTIC Science & Technology

    1989-07-01

    64.15 64-5 JP-4 Fuel-Water Partition Coefficients (K,) for Selected Hydrocarbons .......................... 64-20 04-6 Acute Toxicity of Components of JP...65.11 65-3 Equilibrium Partitioning of Select Gasoline Hydrocarbons in Model Environments ............... 65-14 65-4 Acute Toxicity of Components o...66-27 66-5 Acute Toxicity of Components of Fuel Oils ............ 66-37 67-1 Composition Dat,- for Stoddard Solvent

  15. Installation Restoration Program. Site Investigation Report. Volume 1. 152nd Tactical Reconnaissance Group, Nevada Air National Guard, Reno Cannon International Airport, Reno, Nevada

    DTIC Science & Technology

    1994-04-01

    measure RRI - Rapid Response Initiative RT - retention time s - seconds SDG - sample delivery group I SI - site investigation SMCLS - secondary maximum...tape and a compass and each grid node was marked with a wooden stake or fluorescent orange paint. At least one point on the grid was surveyed so the

  16. Background Perchlorate Source Identification Technical Guidance

    DTIC Science & Technology

    2013-12-01

    Sciences Branch (Code 71752) of the Advanced Systems and Applied Sciences Division (Code 71700), Space and Naval Warfare Systems Center (SSC Pacific), San...Head Advanced Systems & Applied Sciences Division iii EXECUTIVE SUMMARY The objective of this document is to outline the approach, tools, and...Helium HMX Octahydro-1,3,5,7-Tetranitro-1,3,5,7- Tetrazocine IR Installation Restoration IRIS Integrated Risk Information System IR-MS Isotope-Ratio

  17. Seeding versus natural regeneration: A comparison of vegetation change following thinning and burning in ponderosa pine

    Treesearch

    Judith D. Springer; Amy E. M. Waltz; Peter Z. Fule; Margaret M. Moore; W. Wallace Covington

    2001-01-01

    The decision whether to seed with native species following restoration treatments should be based on existing vegetation, species present in or absent from the soil seed bank, past management history, microclimate conditions and soils. We installed three permanent monitoring plots in two areas (total 18.6 ha) at Mt. Trumbull, AZ. Trees were thinned and the sites burned...

  18. Installation Restoration Program Preliminary Assessment, Big Mountain Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design, project management and implementation of various...management functions, as well as direct involvement in project marketing, corporate computer and CAD operations, and company R&D efforts. 5 DETOX , Inc...interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as sale and management of several substantial and

  19. Installation Restoration Program Preliminary Assessment Naknek Recreational Camps, Alaska

    DTIC Science & Technology

    1989-04-01

    training, as well as other environmental matters. DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design...operations, and company R&D efforts. 3 DETOX . Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United States, responsibilities...resulted in establishing a widespread customer interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as

  20. Installation Restoration of Frankford Arsenal, Pennsylvania, Concept Plan

    DTIC Science & Technology

    1977-09-01

    combined with 650 ml of tetrazine slurry. To this mix was added other components (e.g., antimony sulfide , powdered aluminum, PETN, barium nitrate and a...such materials as barium nitrate, magnesium and aluminum powders, potassium perchlorate, iron oxide, red phosphorus, strontium peroxide, strontium...soluble in acetone and nethyl acetate. Chemical Activity: Decomposed slowly by boiling 2.5% aqueous caustic;0 decomposed slowly by sodium sulfide

  1. Results of soil, ground-water, surface-water, and streambed-sediment sampling at Air Force Plane 85, Columbus, Ohio, 1996

    USGS Publications Warehouse

    Parnell, J.M.

    1997-01-01

    The U.S. Geological Survey (USGS), in cooperation with Aeronautical Systems Center, Environmental Management Directorate, Restoration Division, prepared the Surface- and Ground- Water Monitoring Work Plan for Air Force Plant 85 (AFP 85 or Plant), Columbus, Ohio, under the Air Force Installation Restoration Program to characterize any ground-water, surface-water, and soil contamination that may exist at AFP 85. The USGS began the study in November 1996. The Plant was divided into nine sampling areas, which included some previously investi gated study sites. The investigation activities included the collection and presentation of data taken during drilling and water-quality sampling. Data collection focused on the saturated and unsatur ated zones and surface water. Twenty-three soil borings were completed. Ten monitoring wells (six existing wells and four newly constructed monitoring wells) were selected for water-quality sam pling. Surface-water and streambed-sediment sampling locations were chosen to monitor flow onto and off of the Plant. Seven sites were sampled for both surface-water and streambed-sediment quality. This report presents data on the selected inorganic and organic constituents in soil, ground water, surface water, and streambed sediments at AFP 85. The methods of data collection and anal ysis also are included. Knowledge of the geologic and hydrologic setting could aid Aeronautical Systems Center, Environmental Management Directorate, Restoration Division, and its governing regulatory agencies in future remediation studies.

  2. Sediment dynamics in restored riparian forest with agricultural surroundings

    NASA Astrophysics Data System (ADS)

    Stucchi Boschi, Raquel; Cooper, Miguel; Alencar de Matos, Vitor; Ortega Gomes, Matheus; Ribeiro Rodrigues, Ricardo

    2017-04-01

    The riparian forests are considered Permanent Preservation Areas due to the ecological services provided by these forests. One of these services is the interception of the sediments before they reach the water bodies, which is essential to preserve water quality. The maintenance and restoration of riparian forests are mandatory, and the extent of these areas is defined based on water body width, following the Brazilian Forest Code. The method used to define the size of riparian forest areas elucidates the lack of accurate scientific data of the influence of the riparian forest in maintaining their ecological functions, particularly regarding the retention of sediments. In this study, we investigate the dynamics of erosion and sedimentation in restored riparian forests of a Semideciduous Tropical Forest situated in agricultural areas inserted in sugarcane landscapes in the state of São Paulo, Brazil. We defined two sites with soils of contrasting texture to monitor the dynamics and amount of deposited sediments. Site A is in the municipality of Araras and the soil is mainly clay. Site B is in the municipality of São Manuel and is dominated by sandy soils. In both areas, we defined plots to install graded metal stakes that were partially buried to monitor the dynamics of sediments. In site A, we defined eight plots and installed 27 metal stakes in each one. Three of the plots presented 30 m of riparian forest, two presented 15 m of riparian forest and three, 15 m of pasture followed by 15 m of forest. The design of the metal stakes was similar for all plots and was defined based on the type of erosion observed in site A. In site B, we defined seven points to monitor the sediments inside the reforested areas. Here, we observed erosive processes of great magnitude inside the forests, which results in a different design for the metal stakes. A total of nearly 150 metal stakes were installed to monitor these processes and also to verify the deposition in areas not yet affected by erosive processes of great magnitude. The monitoring of the metal stakes started in January of 2016. The data of intensity and frequency of rainfall were collected from rain gauges installed in the areas. The results show great deposition in site B, dominated by sandy soil whereas in site A, a sheet erosion process is dominant. Site A is dominated by clay soils that are not susceptible to erosion processes. In site B, a small amount of deposition was observed inside a gully, which means that the sediments may be being carried to the water bodies. A large amount of sediment was observed in areas which present a spontaneous vegetation followed by a small track of forest. Strong events were responsible for generating most of the sediments. The results will be important to support the discussion about an ideal width of riparian vegetation to ensure the retention of sediments and quality of water bodies.

  3. Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lum, Clinton C. L.

    This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less

  4. Installation Restoration Program. Phase 1. Records Search, Air Force Plant Number 83, Albuquerque, New Mexico

    DTIC Science & Technology

    1983-12-01

    STATEMN’T L * N N 0UNCE D J UST I IICATION T DI Sr 141I IIIT ION / AVAII.ABII flV CODES )SFRIKB-T.OS AVAr.Aa[Ll-Y ANOi SPECIAL ePI A /DIST RIUTION STAMP...Storage Area No. 3 I C-3 Analytical Results for the Soil Sample Taken in the North Parking Lot APPENDIX D PHOTiOGRAPiS APPENDIX E USAF INSTALLATION...1970’s-1981 54 Storage No. 4 5 Underground Cyanide Mid 1950’s to La te 1970’s 51 I Vault i I 1 I I I FIGURE 1 00 z IWO zZi II : 0C OJ IL W z D 0j I co

  5. Installation Restoration Program. Final Report Phase II, Stage 1 - Problem Confirmation Study, Norton Air Force Base, San Bernardino, California. Volume 2. Appendices.

    DTIC Science & Technology

    1985-07-01

    surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...described in Section 7. 2-bromo- 1 - chloropropane , and 0.3 Adjust the purge gas (nitrogen 8.3.2 The laboratory must develop 14-dichlorobutane is...46 UNCLSSIFIED F/G 13/2 UL mhmmhmhohEEEmhI wJI. 1.0S ’, LI U.2..12.2 1 . 111110 MICROCOPY RESOLUION ES CHART""., -6 -’S- . 1 °"°, 5- -i -1.0..-+-’.2,i

  6. Installation Restoration Program (IRP) Stage 7, Remedial Investigation/ Feasibility Study Comprehensive CERCLA Work PLan for McClellan AFB/EM, McClellan AFB, California

    DTIC Science & Technology

    1991-07-01

    Systems Audits ; Preventive Maintenance; Data Assessment Procedures; Corrective Action; Quality Assurance Reports; and Site Management. General Data Quality...for verification and quality control audits . A copy of the QAPP will be in the possession of field sampling teams for all sampling efforts...L cc- acca C wi w-C P-3-- C I- usu 2; - at C4~~2 Q (( c ccc c-c C- 0L U -C 3- au S - - C3 . - acu tr - -a CL.43 C LU -C2 -C ul 0it S w- -C u Ocw - z i

  7. Installation Restoration Program. Phase I. Records Search, Air Force Plant 44, Tucson, Arizona.

    DTIC Science & Technology

    1985-10-01

    Biographical Data APPENDIX B List of Interviewees and Outside Agency Contacts APPENDIX C Master List of Industrial Shops * APPENDIX D References APPENDIX E AF...Collected by the Tucson Groundwater Contamination Study Task Force * Annual Generator’s Reports and Quarterly Reports from AFP 44 to ADHS. Appendix D ...cn (INcC. iU u u a L- - -2 a 0 0) CL C 1-4~~ ~ r % %- d ’ 00 A to did 1-44 L0 47% 0 z- d Ci - Z ..-i I2-8 00 -4 40 0 -0 0j c 0 Sb. 1.- 41 CL "-4 CLV

  8. No Further Remedial Action Planned Decision Document for Site 3.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery

  9. Installation Restoration Program. Remedial Investigation Report. Volume 2. Sections 4-6. Alpena Combat Readiness Training Center, Alpena County Regional Airport, Michigan Air National Guard, Alpena, Michigan.

    DTIC Science & Technology

    1995-06-01

    Remedial Investigation Report of Sites l-9 at Alpens CRTC Alpena Ml. Volume II Sections 4-6. A remedial investigation was performed on 9 sites at the... Alpena CRTC to determine the extent of contamination at the sites. The sites involved ill this investigation include: Site 1 POL Storage Area; Site 2

  10. Installation Restoration Program Decision Document. Site 15. Alpena Combat Readiness Training Center, Michigan Air National Guard, Alpena County Regional Airport, Alpena, Michigan.

    DTIC Science & Technology

    1996-05-01

    This Decision Document (DD) supports the no further action alternative for Site 15 - Oiled Roads at the Alpena Combat Readiness Training Center (CRTC...in Alpena , Michigan. The purpose of the DD is to summarize the existing data for the site and describe the Air National Guard’s rational for selecting the no further action alternative.

  11. Installation Restoration Program. Phase 2 - Confirmation/Quantification Stage 1, Dover Air Force Base, Dover, Delaware. Volume 2. Appendices

    DTIC Science & Technology

    1986-06-01

    63’ Reference Date Tinx- Point Elevation: Drilling Started:11/8/84 1330hrs Drillinz Cornpleted:11/12/84 1100 Site Sketch Waer Leel: 13.5’ 11/9/84 0900...Box 1401 TELEPHONE (302) 736 4761I DOVER. DELAWARE 1 9903 I MEMORANDUM 3 TO: Mr. Kevin Burdette FROM: Philip J. Cherry’j DATE: October 22, 1984 The

  12. Installation Restoration Program. Phase 1. Records Search, Scott AFB, Illinois

    DTIC Science & Technology

    1985-04-01

    mission of defense of the United States, has long been engaged in a wide variety of opera- tions dealing with toxic and hazardous materials. Federal...Histopathology-Cytology Sewer Dental Clinic/Laboratory 1680 Yes Yes DPDO, Sanitary Sewer, Medical Logistics Radiology/X-Ray 1680 Yes Yes DPDO, Sanitary...disintegrate. HALOGEN: The class of chemical elements including fluorine , chlorine, i bromine, and iodine. HALON 1211: A fire extinguishing agent

  13. Installation Restoration Program Preliminary Assessment Kalakaket Creek Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    area (Cass, 1959). According to the U.S. Soil Conservation Service, the soils in the general vicinity of Kalakaket Creek are of the Pergelic ...Cryumbrepts-Histic Pergelic Cryaquepts, very gravelly, hilly to steep association. The association is found in glacially carved mountain valleys, moraine foot...two other components. Of the principal components, Pergelic Cryumbrepts, very gravelly, hilly to steep, accounts for 45 percent. These are well drained

  14. Installation Restoration Program. Phase 1: Records Search, Sheppard AFB, Texas

    DTIC Science & Technology

    1984-02-01

    Environmental Response, Compensation, and Liability Act (CIERA) of 1980, by Executive Order 12316, and 40 Ci 300 Subpart F (National Contingency Plan). CCLA...hensive Environmental Response, Compensation, and Liability Act of 1980 (CURCLA). A potentially hazardous waste is one which is suspected of being...site for agricultural purposes to prevent food chain contamination. Silvicultural use Restrict the use of the site for silvi- cultural uses (root

  15. Installation Restoration General Environmental Technology Development. Task 3. Guidelines for In-Place Closure of Dry Lagoons. Volume 2. Evaluation of In-Place Closure Technologies.

    DTIC Science & Technology

    1984-01-01

    fac- turs are described as follows: (a) Basil stability -- Determination of horizontal movement in the slurry wall or the ground behind the wall...SG-l.2) M Acid mine drainage (FeSO4 pH 3) N Liqnin (in Ca++ solution) N Orqanic residues trom pesticide manutacture N Alcohol M/H asiqnificant

  16. Terrain, weather pose challenges in Minnesota project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trojack, L.

    1994-12-01

    This paper briefly reviews an innovative method used in installing a natural gas pipeline in Minnesota which traversed a marsh area. Because of the special problems associated with this wetland area, special equipment and techniques had to be used to minimize disturbance associated with the construction. It describes the equipment and the resulting performance the equipment had. It proved to significantly reduce disturbance and result in minimum site restoration work.

  17. Installation Restoration Program. Phase II. Confirmation/Quantification Stage I.

    DTIC Science & Technology

    1986-02-24

    Drilling and sampling three...borings at Site 8; o Drilling and sampling three borings at Site 11; and o Drilling and sampling three borings at Site 12. The ground water samples...8217-"~~~~~~.."." . " -’ - . .. . ;’ "..-. ’,"",,.- - -".-" - ’ -- -... ... ~ -. . ... ... " " 1 *. Sites Recommended Action Rationale U 8 Drill and sample one background To estimate

  18. Installation Restoration Program. Idaho Air National Guard, Gowen Field, Boise, Idaho, Site Inspection Report. Volume 2

    DTIC Science & Technology

    1989-03-21

    Seattle.Washington 98108 (206)767-5060 Chemistr . Microbklog. and Technical Services 1. TO: Science Applications International Corporation LABORATORY I.D...Certificate 940 South HarneySt.. Seattle.Washington 98108 (206)767-5060 ) Chemistr . Micrcbiob .and Technical Services TO: Science Applications...HarnreySt Seattle.Washington 98108 (206)767-5060 Chemistr " Microbiocoy and Technical Services SAIC LABORATORY NO. 3894 APPENDIX A Method Blank

  19. Installation Restoration Program. Phase I. Records Search, Vance Air Force Base, Oklahoma.

    DTIC Science & Technology

    1984-07-01

    cadmium , and descaling solutions. The general trend in waste disposal over the years since VAFB first began operation has been from 3 largely unsegregated...generated at the jet engine shop and metal plating shops and consists of phosphoric acid, chromic acid, potassium permanganate, cadmium , and descaling...benzene, MIBK, carbon tetrachloride, MEK, methylene chloride, and acetone. The metal analytes should include cadmium , chromium, copper, iron, lead

  20. Installation Restoration Program. Phase I: Records Search Goodfellow Air Force Base, Texas.

    DTIC Science & Technology

    1985-03-01

    CHDRO - ARSENIC SARIUM, CADMIUM MIUM. COPPER. IRON, DIS- DIS- DIS- DIS- DIS- DIS- SOLVED SOLVED SOLVED SOLVED SOLVED SOLVED TIME (UOIL (UCIL (UGIL (UG/L... cadmium , chromium, copper, iron, lead, manganese, mercury, nickel, silver, and zinc. The recommended parameters include those compounds known or...8217. ... . . -. * -:,-..’... .... ’.... ...’. .’..".-... ... -......- . ..............-............... . ..... .. APPENDIX A (Continued, Page 2 of 7) Cadmium A metal used in batteries and other industrial

  1. Installation Restoration Program (IRP). Phase 2. Confirmation/Quantification. Stage 1. Buckley Air National Guard Base, Colorado.

    DTIC Science & Technology

    1986-03-21

    Firm hazardous waste contamination investigations in Utah and Colorado . o Conducted ground and surface water sampling for Durango S UMTRAP (Uranium...BASE COLORADO DAMES & MOORE 1550 NORTHWEST HIGHWAY PARK RIDGE, ILLINOIS 60068 MARCH 21, 1986 FINAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION...FOR BUCKIEY AIR NATIONAL GUARD BASE COLORADO HEADQUARTERS AIR NATIONAL GUARD COMMAND SURGEON’S OFFICE (ANGSC/SGB) BIOENVIRONMENTAL ENGINEERING

  2. Installation Restoration Program, Stage 3, McClellan Air Force Base. Preliminary Groundwater Operable Unit Remedial Investigation (Hydrogeologic Assessment) Sampling and Analysis Plan

    DTIC Science & Technology

    1990-02-01

    PRESENT C,(8;2) 131o sia &1 OTE MUNICIPAL WATER b9PLY WELLS: ON-BASE CW CITY OSARMENTO AREAS NW NORTHRIDGE WATEtj DISTRICT RW RIO LINDA AW ARCADE WATER...1ASE PRODUCTION WELL ACTIVE BAS PRODUCTION WELL ., CITY WELL T #f CALTRANS WELL . EXTRACTION WELL 0 500 1000 N : SCALL IN FEET If-3. 82

  3. Installation Restoration Program. Preliminary Assessment: Connecticut Air National Guard, 103rd Tactical Fighter Group (TFG), Bradley International Airport, Windsor Locks, Connecticut and 103rd Tactical Control Squadron (TCS), Orange/West Haven, Connectiut

    DTIC Science & Technology

    1988-11-01

    poorly sorted, not I E compacted, very plastic . Contains siliceous N diatoms and spores. Organic content high (17.2 T percent of sample lost during...physical character of a rock (e.g., particle size, color, mineral content, primary strutures, thickness, weathering caracteristics , and other physical

  4. Installation Restoration Program. Phase 1: Records Search, Beale AFB, California

    DTIC Science & Technology

    1984-04-25

    following reasons: (1) to provide the continued protaction of human health, welfare, and the environment; (2) to insure that the migration c:-. potential...Education B.S. in Biology (magna cum laude), 1975, Stetson University, Deland, Florida Ph.D. in Ecology, 1982, State University of New York, Stony Brook...ecology, entomology, plant ecology, population bio- logy, genetics, and general biology . Developed and coordinated laboratory and field exercises

  5. Restoration planting options for limber pines impacted by mountain pine beetles and/or white pine blister rust in the Southern Rocky Mountains

    Treesearch

    Anne Marie Casper; William R. Jacobi; Anna W. Schoettle; Kelly S. Burns

    2010-01-01

    Limber Pine (Pinus flexilis) populations in the southern Rock Mountains are severely threatened by the combined impacts of mountain pine beetles and white pine blister rust. Limber pine’s critical role these high elevation ecosystems heightens the importance of mitigating impacts. To develop forest-scale planting methods six seedling planting trial sites were installed...

  6. Constructed Pools-and-Riffles: Application and Assessment in Illinois.

    NASA Astrophysics Data System (ADS)

    Day, D. M.; Dodd, H. R.; Carney, D. A.; Holtrop, A. M.; Whiles, M. R.; White, B.; Roseboom, D.; Kinney, W.; Keefer, L. L.; Beardsley, J.

    2005-05-01

    The diversity of Illinois' streams provides a broad range of conditions, and thus a variety of restoration techniques may be required to adequately compensate for watershed alterations. Resource management agencies and research institutions in the state have collaborated on a variety of applied research initiatives to assess the efficacy of various stream protection and restoration techniques. Constructed pool-and-riffle structures have received significant attention because they tend to address watershed processes (i.e., channel evolution model) and may benefit biotic communities and processes along with physical habitat. Constructed pools-and-riffles have been applied primarily to address geomorphic instability, yet understanding biological responses can provide further rationale for their use and design specifications. In three stream systems around the state, fish were collected pre- and post- installation of structures, using primarily electrofishing techniques (e.g., electric seine & backpack). In general, within the first five years after installation, changes in fish communities have included a shift from high-abundance, small cyprinid-dominated assemblages to low-density Centrarchidae and Catostomidae assemblages. Changes in macro invertebrates at selected sites included increases in filter feeders and sensitive taxa such as the Ephemeroptera, Plecoptera, and Trichoptera (EPT). Ongoing assessments will be critical for understanding long-term influences on stream ecosystem structure and function.

  7. Burrowing owl nesting productivity: A comparison between artificial and natural burrows on and off golf courses

    USGS Publications Warehouse

    Smith, M.D.; Conway, C.J.; Ellis, L.A.

    2005-01-01

    Burrowing owl (Athene cunicularia) populations are declining in many portions of their range, and lack of suitable nesting burrows is thought to be one reason for observed declines. Burrowing owls are attracted to golf courses because the birds generally nest and forage in short-grass, open areas, yet golf courses seldom have suitable nesting burrows. We examined the efficacy of installing artificial nesting burrows on golf courses as a way to help restore local burrowing owl populations. From 2001-2004 we monitored over 175 natural burrows off golf courses, 14 natural burrows on golf courses, 86 artificial burrows off golf courses, and 130 artificial burrows on golf courses. Owls located and used 8 of the 130 artificial burrows installed on golf courses (4 were used as nests). Owls selected burrows that were closer to existing natural burrows, farther from maintained areas (areas receiving turf maintenance by golf course staff), and farther from sprinkler heads. All 4 of the artificial burrows used as nests successfully fledged young, and annual site fidelity for owls nesting on golf courses was higher than for owls nesting off golf courses. However, annual fecundity of owls nesting on golf courses was lower than that of owls nesting off golf courses. If golf courses have sufficiently large nonmaintained areas and there are nesting owls nearby, course managers potentially can help in restoring local burrowing owl populations by installing artificial nesting burrows on the periphery of the course. However, the low fecundity on golf courses reported here should be more thoroughly examined before artificial burrows are used to attract owls to golf courses.

  8. Stream and floodplain restoration in a riparian ecosystem disturbed by placer mining

    USGS Publications Warehouse

    Karle, Kenneth F.; Densmore, Roseann V.

    1994-01-01

    Techniques for the hydrologic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve Alaska, USA. The hydrologic study focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements include a channel capacity for a 1.5-year (bankfull) discharge and a floodplain capacity for a 1.5- to 100-year discharge. Concern for potential damage to the project from annual flooding before natural revegetation occurs led to development of alder (Alnus crispa) brush bars to dissipate floodwater energy and encourage sediment deposition. The brush bars, constructed of alder bundles tied together and anchored laterally adjacent to the channel, were installed on the floodplain in several configurations to test their effectiveness. A moderate flood near the end of the two-year construction phase of the project provided data on channel design, stability, floodplain erosion, and brush bar effectiveness. The brush bars provided substantial protection, but unconsolidated bank material and a lack of bed armour for a new channel segment led to some bank erosion, slope changes and an increase in sinuosity in several reaches of the study area.

  9. Installation Restoration Program. Phase II. Confirmation McClellan AFB, California. Volume 2.

    DTIC Science & Technology

    1983-06-01

    ARM SYSTE . Hazard Assesment Rating Methodology. HEAD. Height of the free surface of fluid above any point in a hydrau- lic...pest/herb/metals) previous sample was insuf- 1 gallon bottle ficient. Hydrocarbons were (GC/NS) on top of water surface , I VDA bottle about 1/2 inch... surface . Water became 1 quart polyeth- silty during bailing. Samples ylene bottle waere obtained using the glass/ (cyanide) Teflon sampler. Both the

  10. Preliminary Assessment/Site Investigation: Tooele Army Depot, Utah. Volume 2. South Area

    DTIC Science & Technology

    1988-12-29

    Program until the period from 17 February to 5 March 1987. 1.3 OVERVIEV OF REPORT The remaining chapters of this report (Volume II) address the following...Engineering, Science, and Technology, Inc. for the purpose of aiding in the implementation of the U.S. Army Installation Restoration Program . The use of...NUMBERS PROGRAM PROJECT ITASK WORK UNIT ELEMENT NO. NO, NO. ACCESSION NO. __ __ __ __ __ __ _ _ __ __ __I___1___1_ 003 11 TITLE (Include Security

  11. Installation Restoration Program. Phase I. Records Search, Hancock Field, New York.

    DTIC Science & Technology

    1982-07-01

    purplish red, red, gray, green or black shale (major fraction) and shaly dolomite (minor fraction). The unit is poorly stra- tified and reaches a... fractured and jointed locally. At Hancock Field, the Vernon is typically overlain by a thin layer of glacial till. Test borings advanced at the Semi...the consolidated rock aquifer, composed of shales and dolomitic shales of the previously described Vernon Formation. Water is contained in this unit

  12. The Installation Restoration Program Toxicology Guide. Volume 3

    DTIC Science & Technology

    1987-06-01

    organ because of injury or disease. log Kow Log of the octanol-water partition coefficient. Lower The lowest concentration of the material in air which...involved in clotting. SGOT Serum glutamic oxalacetic transaminase, an enzyme released into the serum as the result of tissue injury , especially injury ...to the heart and/or liver. SGPT Serum glutamic pyruvic transaminase, an enzyme % released into the serum as a result of tissue injury , 1: especially

  13. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for Minot Air Force Base, Minot, North Dakota. Volume 3. Appendices G through M

    DTIC Science & Technology

    1988-10-01

    TOTAL DISSOVLED SOLIDS 3523/017 1896 1918 --- 3538/024 2625 2567 --- IV. PETROLEUM HYDROCARBON DUPLICATE ANALYSIS WAS NOT DONE DUE TO INSUFFICIENT...Characterized existing hydrogeologic conditions, prepared hydrologic budgets, delineated productive aquifers, performed safe yield determinations , and...New Jersey to determine suitability for building construction. * Supervised soil borings program at large waste disposal facility in Model City, New

  14. Engineering and Development Support of General Decon Technology for the DARCOM Installation Restoration Program. Task 2. Desensitization of Explosive- Laden Soils/Sediments. Volume 1

    DTIC Science & Technology

    1983-06-01

    8217rAPTYT 24. PAý’XI?!C (󈧕 ALTF??iATIVFS (CASJF TWC- RA Ar ’FP!NATTV\\F COPTACTI’G METHOD 1 Chpmrical Feciiiction Linu ~i/Tacgnon 2 (-,a m ra Trra.Ii a...Clifford Randall, and Paul King (1974), "Biological Treatability of Trinitrotoluene Manufacturing Wastewater," Journal of the Water Pollution Control

  15. Installation Restoration Program. Preliminary Assessment: 201st RED HORSE, Civil Engineering Flight, Fort Indiantown Gap Air National Guard Station, Pennsylvania Air National Guard, Annville, Pennsylvania

    DTIC Science & Technology

    1991-02-01

    Pliocene I Neogene 5 Miocene o 0 24 Oligocene Paleogene Eocene 58 6 Paleocene 5I56 Cretaceous u 144- 0 Jurassic 0N 208- Z TriassicI 245- (L Permian 286...and its unnamed tributary I are classified as warm water fisheries. G. Groundwater Use of Uppermost Aquifer. I Site Nos. 1-3, Factor Rating 2. The

  16. Installation Restoration Program Preliminary Assessment Gold King Creek Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    to steep Pergelic Cryaquipts- Pergelic 3 Cryochrepts association. The Pergelic Cryaquepts make up 40 percent of the association. These soils are poorly...occurs at shallow depths. 1 Pergelic Cryochrepts make up 35 percent of this association. These soils are well drained and occur on high ridges and...is at a depth of 20 to 40 inches. The remaining soils within this association include Pergelic Cryorthents (15 percent), Pergelic Cryorthods (5 percent

  17. Installation Restoration Program Preliminary Assessment Bear Creek Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    Cryachrepts, very gravelly, hilly to steep - Histic Pergelic Cryaquepts, loamy, nearly to rolling association. This association is extensive on hilly...loam. On steep slopes, these soils are only 20 to 40 inches deep over bedrock. 3 Histic Pergelic Cryaquepts, loamy, nearly level to rolling, make up 25...usually 10 to 20 inches below the peaty surface. 3 Histic Pergelic Cryaquepts, very gravelly, hilly to steep, compose 10 percent of this association. These

  18. Installation Restoration Program. Volume 1. 110th Fighter Group Michigan Air National Guard, W.K. Kellogg Memorial Airport, Battle Creek, Michigan

    DTIC Science & Technology

    1993-11-01

    GUARD BASE BATTLE CREEK, MICHIGANI REGIONAL LOCATION MAP ýIG A NI 󈨋 -1 10t TAI MICHIAN I i~amoNL GUAR 1- 94Frie Lake ma 61 , 1cI Lose onI diI 0I...textile fabrics. Xylenes are also used in the manufacture of quartz crystal oscillators, hydrogen peroxide, perfumes , insect repellants, epoxy resins

  19. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 4, Fort Worth, Texas. Volume 9. Appendices F-K.

    DTIC Science & Technology

    1987-12-01

    mineralogy and igneous petrology . Consultant to Shield Energy. Inc.; performed mudlogging and well site geology duties on 4,670’ wildcat weil in...Taylor County, Texas. Evaluated prospects for hydrocarbon potential. Prepared geologic reports for drilling prospectus. Geologist, Wold Minerals...Exploration Company; conducted geologic and geophysi- cal mapping in Precambrian metamorphic terrain of West Texas for talc depos- its. Supervised the drilling

  20. Installation Restoration of Rocky Mountain Arsenal, Pilot Containment Operations, Final Environmental Impact Statement, Part 1.

    DTIC Science & Technology

    1977-02-01

    0. . IIU w 00 Z -J-. z 00 D 0 0 !9 I- A, On ~ 0w NON 0~ CoQ UU 00 co qc 00NC r-.N) 0 Lf) C*12 ICD U) o C 14 N0 WU Lo LC LX...for carcinogenic, mutagenic or teratogenic activity in vitro. One report (17) stated that DIMP does not inhibit the enzyme cholinesterase, although no

  1. Installation Restoration Program. Phase 1, Records Search. Chanute AFB, Illinois

    DTIC Science & Technology

    1983-12-01

    Ogle County in northern Illinois to Wabash County in the southeast part of the state. It occurs approximately two miles west of Chanute Air Force Base...AFB) Station I Oil & Ammonia Cadmium Chromium Copper Iron Lead Mercury Nickel Silver Date COD Grease (*) Phosphorus (50)* (1000)* (20)* (1000) • (100...MONITORING DATA SALT FORK CREEK BEFORE TRIBUTARY CONFLUENCE (Before Entering Chanute APB) Station 2 Oil & Ammonia Cadmium Chromium Copper Iron Lead Mercury

  2. Installation Restoration Program. Phase 1. Records Search. Air Force Plant Number 3, Tulsa, Oklahoma

    DTIC Science & Technology

    1983-12-01

    treatment plant was designed for cyanide and chromium treat- ment. Wastes are collected in two separate sewer systems; acid-chrome, and alkali cyanide...reduction of hexavalent chrome to trivalent chrome with sulfur dioxide. After the oxidation and reduction are accomplished separately, the wastes are...uses of the water. CCNVEPSI N COATING WASTE: Acidic solution containinq chromium . 0COOLANT: An oil-water mixture used for coolina metal parts durirq

  3. Installation Restoration Program. Phase 1: Records Search, Williams AFB, Arizona

    DTIC Science & Technology

    1984-02-01

    Minimum 4.5 Trace substances, maximum -. allowable limits, (mg/1) Arsenic 2.00 Boron 1.00 Cadmium 0.05 Chromium (hexavalent and trivalent ) 1.00 Copper...located in Building 32. Chromium , cadmium, and copper electroplating operations were conducted in a temporary building, T-31 . Paint stripping was... chromium plating wastes. The paint separator receives wastes from paint stri.pping operations that are performed in Buildings 25 and 1086. It also

  4. Installation Restoration Program. Phase 1. Records Search, Lackland AFB, Texas

    DTIC Science & Technology

    1985-02-01

    governmental environ- mental projects. Environmental Engineering Department Head (1973-1976). Supervised staff involved in auditing environmental practices...V. -4 a a ; to- w w M, 4-. c* a a M - ~ a -- ~= a a a a a aa as-au ’- aC aCca - ~~~ - aa:0 a 0 24 X4 JU 2 a -- a. -~a - .wZ 2kD.4 4 ob0 m C C w 4a

  5. Installation restoration program. Decision document for soil and groundwater at the storage area at the USMC Subleased Area, Site 3. 144th Fighter Wing, California Air National Guard, Fresno Air Terminal, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    Decision Document for IRP Site No. 3 - Storage Area at the USMC Sublease Area, California Air National Guard, 144th Fighter Wing, Fresno Air Terminal, Fresno, California. This report documents the data, conclusion, and recommendation to support a No Further Remedial Action Planned decision at Site 3 under the IRP.

  6. Installation Restoration Program. Phase 1 - Records Search, Homestead AFB, Florida

    DTIC Science & Technology

    1983-08-01

    con- ducted on a weekly basis. Since the early 1970’s, water and Aqueous . Film Forming Foam ( AFFF ) have been the main extinguishing agents used. Fuels...were occasionally disposed of at the site. Typically, water and AFFF were used as fire extinguishing agents. The site received a HARM score of 66. This...project activities include designs for Owens-Corning Fiberglas; 36,000 gpm neutralization facilities for FC Corporation; wastewater reclamation facilities

  7. Installation Restoration Program Records Search for Cannon Air Force Base, New Mexico.

    DTIC Science & Technology

    1983-08-01

    several years. A deteriorating black plastic liner was noted at the edge of the shallow pit. Approximately 4 to 6 inches of soil covered the rest of...subtotal/eximtm subtotal) 56 II. WASTE CARACTERISTICS A. Select the factor score based on the eatimeted quantity, the degree of hazard, and the...anticipated soil properties such as gradation, plasticity , or permea- bility by performing appropriate laboratory tests. In addition, soil samples may be

  8. Installation Restoration Program. Phase 2. Confirmation/Quantification Stage 1. US Air Force Plant Number 42, Palmdale, California. Volume 1

    DTIC Science & Technology

    1987-02-20

    Bacteriology; 8 years professional experience; served as Project Health and Safety Officer. 1-37 o Duane R. Boline - Ph.D. in Analytical Chemistry ; M.S. in... Chemistry ; B.S.E. in Physical Science; 18 years professional experience; served as Project Quality Assurance Officer. Complete biographical data...University, 1962 M.S., Chemistry , Einporia State University 1965 Ph.D., Analytical Chemistry , Kansas State University, 1975

  9. Installation Restoration Program. Phase 2. Confirmation, Edwards AFB, California

    DTIC Science & Technology

    1982-09-01

    aquifer boundaries has created unique hydrological conditions, with fluctuating water levels and continuously changing regimes of confinement...wells, resulting in changes in the regional gradien,ý from north to south. Figure 2.3 shows the groundwater table contours as of 1979 (U.S.G.S., 1980...of 11 inches. The maximum mean monthly rainfall occurs in February with about 0.5 inch in one day (Envirodyne Engineers, Inc., 1981). In arid climates

  10. Improving the indoor air quality by using a surface emissions trap

    NASA Astrophysics Data System (ADS)

    Markowicz, Pawel; Larsson, Lennart

    2015-04-01

    The surface emissions trap, an adsorption cloth developed for reducing emissions of volatile organic compounds and particulate matter from surfaces while allowing evaporation of moisture, was used to improve the indoor air quality of a school building with elevated air concentrations of 2-ethyl-1-hexanol. An improvement of the perceived air quality was noticed a few days after the device had been attached on the PVC flooring. In parallel, decreased air concentrations of 2-ethyl-1-hexanol were found as well as a linear increase of the amounts of the same compound adsorbed on the installed cloth as observed up to 13 months after installation. Laboratory studies revealed that the performance of the device is not affected by differences in RH (35-85%), temperature (30-40 °C) or by accelerated aging simulating up to 10 years product lifetime, and, from a blinded exposure test, that the device efficiently blocks chemical odors. This study suggests that the device may represent a fast and efficient means of restoring the indoor air quality in a building e.g. after water damage leading to irritating and potentially harmful emissions from building material surfaces indoors.

  11. Installation-Restoration Program. Phase 2. Confirmation/quantification. Stage 1. Problem confirmation study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland. Final technical report, November 1983-July 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kraybill, R.L.; Smart, G.R.; Bopp, F.

    1985-09-04

    A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test-pit investigations were conducted at six sites. In addition, the contents of a sumpmore » tank, and two header pipes for fuel-transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority-pollutant volatile organic compounds and a GC fingerprint scan for fuel products. On the basis of the field-work findings, it is concluded that, to date, water-quality impacts on ground water from past activities have been minimal.« less

  12. Pipeline corridors through wetlands - impacts on plant communities: Bayou Pointe Aux Chenes, Terrebonne Parish, Louisiana. Topical report, August 1991--April 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Dyke, G.D.; Shem, L.M.; Zimmerman, R.E.

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and night- of-way management practices. This report presents the results of a survey conducted on August 22, 1991, in an emergent intertidal estuarine wetland in Terrebonne Parish, Louisiana. The site includes three pipelines installed between 1958 and 1969. Vegetation within the site comprises three native tidal marsh grasses: Spartina alterniflora, Spartina patens, and Distichlismore » spicata. All three species occurred over the pipelines, within the right-of-way and in both natural areas. Vegetative differences attributable to the installation or presence of the pipelines were not obvious over the pipelines or in the habitat east of the pipelines. However, because of the presence of a canal west of the 1969 pipeline, vegetation was less abundant in that area, and D. spicata was absent from all but the most distant plots of the transacts. Data obtained in the study indicate that when rights-of-way through brackish marsh are restored to their original elevations, they are revegetated with native vegetation similar to that in surrounding areas.« less

  13. Sediment cores and chemistry for the Kootenai River White Sturgeon Habitat Restoration Project, Boundary County, Idaho

    USGS Publications Warehouse

    Barton, Gary J.; Weakland, Rhonda J.; Fosness, Ryan L.; Cox, Stephen E.; Williams, Marshall L.

    2012-01-01

    The Kootenai Tribe of Idaho, in cooperation with local, State, Federal, and Canadian agency co-managers and scientists, is assessing the feasibility of a Kootenai River habitat restoration project in Boundary County, Idaho. This project is oriented toward recovery of the endangered Kootenai River white sturgeon (Acipenser transmontanus) population, and simultaneously targets habitat-based recovery of other native river biota. Projects currently (2010) under consideration include modifying the channel and flood plain, installing in-stream structures, and creating wetlands to improve the physical and biological functions of the ecosystem. River restoration is a complex undertaking that requires a thorough understanding of the river. To assist in evaluating the feasibility of this endeavor, the U.S. Geological Survey collected and analyzed the physical and chemical nature of sediment cores collected at 24 locations in the river. Core depths ranged from 4.6 to 15.2 meters; 21 cores reached a depth of 15.2 meters. The sediment was screened for the presence of chemical constituents that could have harmful effects if released during restoration activities. The analysis shows that concentrations of harmful chemical constituents do not exceed guideline limits that were published by the U.S. Army Corps of Engineers in 2006.

  14. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland.

    DTIC Science & Technology

    1985-09-04

    health effects was noted in any of the monitor wells. Wells RFW- I , RFW-2A, . and RFW-4, at the Base Landfill, RFW-5 (CFTA) and RFW-10 (PFSA) were...88-D-4006 F/G 24/4 UmEohEEEEEEmiE EEEEEAhEEEEEEEEEEEEEEEEEE EhEEEEmmhmmhhEEE I EEEEEEEEEEEEE 11111 3315 111W12 w ~ ~ ~ ~ d -W w w - v w v w ,!:..4 4...OEHL) Brooks Air Force Ba:;e, Texas 78235-5501• DTIC ECTE October 1935 JUL 0 6 1988 H p.’ DESI CONSULTANTS Approve-. h)r pvhTElMre Volume I - Text " L

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Feasibility Study (FS) Report has been prepared for the Air National Guard Readiness Center (ANORC) under the U.S. Department of Defense`s (DOD) Installation Restoration Program (IRP). The purpose of this FS is to screen and evaluate potential remediation alternatives for IRP sites and areas of concern (AOC) at the Kellogg Memorial Airport in Battle Creek, Michigan that have previously been identified as having contaminated soil and/or groundwater. This FS has been prepared pursuant to the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA). Montgomery Watson hasmore » been contracted to prepare this FS report under contract DAHA90-94-D-0013, Delivery Order 13.« less

  16. Installation Restoration Program Stage 2 Remedial Investigation/Feasibility Study for BOMARC Missile Accident Site, McGuire Air Force Base, New Jersey.

    DTIC Science & Technology

    1992-05-26

    resources include those contained within the New Jersey Pinelands, such as cranberry bogs and blueberry harvesting. 2.6 Cultural Resources Cultural resources...settlements which were associated with this industry can still be found. Commercial blueberry production was also practiced in the late 1800s and early...aA mm to m m mm to mm -* ,0 00 0 -- a 00 0o 00v 00 00 00 00 00 dL . L. 0. 0.- o .L .L .L. t . L ff oc oo 3 oc ss c s Io C7C7 (( L -(. ma t . m. On 0a

  17. Installation Restoration Program (IRP), Phase II, Stage 1 - Problem Confirmation Study, Norton Air Force Base, San Bernardino, California. Volume 1. Technical Report.

    DTIC Science & Technology

    1985-07-01

    protein, and AFFF (Air Force Firefighting Foam). The frequency of training exercises has varied considerably over the years. During the early 1970’s...Surface ’ Cement/ Bentonite Grout Bentonite Seal Sand Pack 1. Ground Water Elevation r Mamaur July 4.5, 194 * . FIGURE 3-9 WELL CONSTRUCTION SUMMARY, ZONE...e zzzzzzzzz z I z z Z 0 -. N N E-3 3 0 3 3 w 3 w 0 o z ~ zzzzzzzz z z z z E- 0 0 E- 0z zzzzzzzz zz aua E- 0 4 10 zw 3 E- z 0 0 U)z V fC InZ OE- 3

  18. Installation Restoration Program. Phase II, Stage 1. Problem Confirmation Study, Luke Air Force Base, Glendale, Arizona.

    DTIC Science & Technology

    1984-11-01

    CONTENTS Section Title Page 4.3 Water Chemistry Conditions 4-10 4.3.1 Groundwater Quality Results 4-10 0 4.4 Water Quality - General 4-11 4.4.1 Water...Quality - General 4-11 4.4.2 Water Quality at LAFB 4-11 4.4.3 Soil Quality - General 4-15 0 4.4.4 Soil Quality at LAFB 4-15 4.4.5 Conclusions 4-16 5...ALTERNATIVE MEASURES 5-1 5.1 General 5-1 0 5.1.1 Base Production Wells 5-2 5.1.2 Current and North Fire Depart- 5-2 ment Training Areas 5.2 Summary 5

  19. Method for estimating potential wetland extent by utilizing streamflow statistics and flood-inundation mapping techniques: Pilot study for land along the Wabash River near Terre Haute, Indiana

    USGS Publications Warehouse

    Kim, Moon H.; Ritz, Christian T.; Arvin, Donald V.

    2012-01-01

    Potential wetland extents were estimated for a 14-mile reach of the Wabash River near Terre Haute, Indiana. This pilot study was completed by the U.S. Geological Survey in cooperation with the U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS). The study showed that potential wetland extents can be estimated by analyzing streamflow statistics with the available streamgage data, calculating the approximate water-surface elevation along the river, and generating maps by use of flood-inundation mapping techniques. Planning successful restorations for Wetland Reserve Program (WRP) easements requires a determination of areas that show evidence of being in a zone prone to sustained or frequent flooding. Zone determinations of this type are used by WRP planners to define the actively inundated area and make decisions on restoration-practice installation. According to WRP planning guidelines, a site needs to show evidence of being in an "inundation zone" that is prone to sustained or frequent flooding for a period of 7 consecutive days at least once every 2 years on average in order to meet the planning criteria for determining a wetland for a restoration in agricultural land. By calculating the annual highest 7-consecutive-day mean discharge with a 2-year recurrence interval (7MQ2) at a streamgage on the basis of available streamflow data, one can determine the water-surface elevation corresponding to the calculated flow that defines the estimated inundation zone along the river. By using the estimated water-surface elevation ("inundation elevation") along the river, an approximate extent of potential wetland for a restoration in agricultural land can be mapped. As part of the pilot study, a set of maps representing the estimated potential wetland extents was generated in a geographic information system (GIS) application by combining (1) a digital water-surface plane representing the surface of inundation elevation that sloped in the downstream direction of flow and (2) land-surface elevation data. These map products from the pilot study will aid the NRCS and its partners with the onsite inundation-zone verification in agricultural land for a potential restoration and will assist in determining at what elevation to plant hardwood trees for increased survivability on ground above frequently flooded terraces.

  20. Striking Clepsydras

    NASA Astrophysics Data System (ADS)

    Nam, Moon-Hyon

    The term "Striking Clepsydra" is a shortened translation of the Korean name Jagyeongnu (自擊漏, tzu-chi lou in Chinese, literally "automatic-striking water-clock"). It was given to the two monumental time-keeping installations built by chief court engineer Yeong-sil Jang in AD 1432-38 under King Sejong (r. AD 1418-50) of the Joseon dynasty (1392-1910) in Seoul. These were housed separately in the Gyeongbok palace complex as major installations of the Royal Observatory Ganuidae equipped during 1432-38. One was the Striking Palace Clepsydra Borugangnu that was employed as the standard time-keeper from 1434, and the other was the Striking Heavenly Clepsydra Heumgyeonggangnu that was put into use not only as the symbol of Neo-Confucian ideology from 1438, but also as a demonstrational orrery and time-keeper. These were restored several times through the dynasty after loss by fires and warfare, and clepsydra-making technologies were succeeded by the development of armillary clocks in 1669. The National Palace Museum of Korea recreated the 1434 Striking Palace Clepsydra of King Sejong, and the replica was installed for permanent exhibition from November 2007.

  1. Air National Guard Installation Restoration Protram. Site Investigation Report: Georgia Air National Guard, Savannah, Georgia

    DTIC Science & Technology

    1992-01-01

    except TPH, which was detected at 0.06 mg/l in Monitor Well 01-MW-02. Some metals (arsenic, cadmium , chromium, lead, silver, and zinc ) were detected at...extraction. Trace quantities of some priority pollutant metals were detected in the surface water samples. Arsenic, cadmium , and zinc were detected at...storage tank. TPH was detected in all five groundwater samples. Arsenic, beryllium, cadmium , chromium, copper, lead, nickel, silver, and zinc were also

  2. Soviet Post-Strike Civil Defense Rescue, Damage-Limiting, Repair and Restoration Operations.

    DTIC Science & Technology

    1982-08-01

    a temporary pipe system laid on the surface of the ground.- Power to pumping stations at undamaged wells or along the pipelines may be provided from...raw materials from severely damaged installations, will be salvaged and possibly used to set up new production lines in different locations. The repair...protect the economy to ensure its "stable" operation in wartime. Despite obvious differences between the U.S. and Soviet political, administrative

  3. Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1991

    DTIC Science & Technology

    1992-02-01

    facility site cleanups. One key area where the Experts During FY 1991, 253 remedial ( AFB ), California; Fort Dix, New Groups are focusing attention...Dover AFB , Dela- process. Current approaches for is greater than the number of instal- ware; McChord AFB , Washington; selecting remedial approaches dis...lations, as more than one type of and Robbins AFB , Georgia. This courage new and unproven tech- action was taken at some brings to 12 the number of

  4. No Further Action Decision Document for Site 8 at Alpena Combat Readiness Training Center, Alpena, Michigan.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 8 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland fr r=.~r i^:r^f>^’ m% Approved for public...Document 4. TITLE AND SUBTITLE No Further Action Decision Document for Site 8 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 7. PERFORMING

  5. The Installation Restoration Program Toxicology Guide. Volume 3

    DTIC Science & Technology

    1989-07-01

    zvli UW OF TABLES Volun.e 4 (Cont.) 69-3 Chemical Additives ............................ 69-15 69-4 Acute Toxicity of Components of Mineral Base...659. Values were estimated by Arthur D. little, Inc. uwing Kow as the basis of estimation (See Introduction, VoL 1). Values of less than one are very...Introduction, Vol. 1). 659. Values were etfiinated by Arthur D. little, In~c. uwing Kow as the basis of. estimation (See Introduction, Vol. 1). Values of

  6. Installation Restoration Program. Phase II--Confirmation/Quantification. Stage 1.

    DTIC Science & Technology

    1985-03-01

    four phases. Phase I, Initial Assessment/ Records Search, is designed to identify possible hazardous waste contami- nated sites and potential...7 71 -. - - IL’ -, 1% 33 AihlIII Is 33 n~iL t iiC UII! ii CL C LU 1-3, Phase II, Confirmation and Quantification, is designed to confirm the...additional monitoring data upon which design of mitigative actions are based. In Phase III, Technology Base Development, appropriate technology is selected and

  7. Final Environmental Assessment for the Airfield Safety Zone Vegetation Clearing at Joint Base McGuire-Dix-Lakehurst

    DTIC Science & Technology

    2011-10-01

    JBMDL’s flying mission. Installation Restoration Program (IRP), Hazardous Materials and Waste Management There are several IRP sites within the...McGuire airfield area; however, none are expected to impact the Proposed Action. Negligible impacts on hazardous materials management during tree clearing...would be expected as only minor quantities of hazardous materials are likely to be used. BMPs would be followed to minimize the possibility of a

  8. Installation Restoration Program Records Search for 158 Tactical Fighter Group, Vermont Air National Guard, Burlington International Airport.

    DTIC Science & Technology

    1983-09-01

    cold winters. Coldest temperatures ir. winter months are caused by high pressure systems which move rapidly dohn from central Canada cr Hudson Eay... dolomitic marble; or sand (30 to 60 feet), Glacial till (30 to 50 feet), and bedrock. The materials occurring above the bedrock in the vicinity of the...Trenton Group Iberville formation Noncalcareous black shale interbedded with 1000 dolomite . Stony point formation Predominantly calcareous black shale

  9. Development of a Computer-Based Air Force Installation Restoration Workstation for Contaminant Modeling and Decision-Making

    DTIC Science & Technology

    1995-03-01

    advisory system provides a decision framework for selecting an appropriate model from the nuimerous available transport models conditinni-ed on...l1, T ,TV Groundwater Modeling, Contaminant Transport , Optimi2atio’ 2; Total Reliability, Remediation Si , , -J % UNCLASSIFIED UNCLASSIFIED...0 0 0 0 S 0 Sn S Even with the choice of an appropriate transport model, considlrable uncertainty is likely to be present in the analysis of

  10. Installation Restoration Program. Phase 1. Records Search Wake Island Airfield

    DTIC Science & Technology

    1984-09-01

    serviced transient Air Force aircraft at Wake Island. Detachments of the 6486th Air Base Wing (predecessor organization *of the 15th Air Base Wing...following groups: " o Base Operations o Transportation Division o Civil Engineering Division . Air Force facilities were located east of the 1700...since these materials were shipped to the base on barges. The contrac- tors also took waste oil from the Air . Force for use in their vehicles and

  11. Installation Restoration Program Stage 3. McClellan Air Force Base Quality Assurance Project Plan

    DTIC Science & Technology

    1989-08-30

    QUALITY ASSURANCE PROJECT PLAN TDTM FINAL ELECTE C\\ JAUG 3 119891 .. .. . .. 0.. ... PREPARD.FOR HEDURTR FL/E WRGTPATRO .. F... OHI.443 ........ 1N...P.E. Contract Program Manager \\ 0 RADMAN 0 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................... 1 of 6...Section: 1.0 RADM Revision: 1 CO PO AIO NDate: 04/12/89 O Page 1 of 6 1.0 INTRODUCTION The Quality Assurance Project Plan (QAPP) presents in specific

  12. High-Temperature Fluid-Wall Reactor Technology Research, Test and Evaluation Performed at Naval Construction Battalion Center, Gulfport, MS, for the USAF Installation/Restoration Program

    DTIC Science & Technology

    1988-01-01

    under field conditions. Sampling and analytical laboratory activities were performed by Ecology and Environment, Inc., and California Analytical...the proposed AER3 test conditions. All test samples would be obtained onsite by Ecology and Environment, Inc., of Buffalo, New York, and sent to...ensuring its safe operation. Ecology and Environment performed onsite verification sampling. This activity was coordinated with the Huber project team

  13. Installation Restoration Program Records Search for George Air Force Base, California

    DTIC Science & Technology

    1982-06-01

    located in the Mojave Desert. The climate is arid with long hot summers and short cool winters. The mean 3relative humidity ranges from 27 percent in...abitat Native plant and animal comunities on base reflect the dry climatic conditions of an upland desert region. Along the eastern border of the bas...soil conditions because of a low ground- water table and the dry climatic conditions. While native systems are disrupted in the immediate vicinity of

  14. Installation Restoration Program. Preliminary Assessment: 192nd Tactical Fighter Group, Virginia Air National Guard, Richmond International Airport, Sandston, Virginia

    DTIC Science & Technology

    1989-02-01

    contaminated by past disposal practices. Sampling and analysis was not included in the PA. B. MAJOR FINDINGS The Air National Guard has utilized...with 23 Base personnel and the field surveys identified 3 potentially contaminated sites resulting from past disposal, storage, and/or spills and leaks...characteristic petroleum odor. With visible evidence of released contaminants , there is potential for contaminant migration by shallow groundwater. Site No. 3

  15. Installation Restoration Program. Phase I. Records Search, Plattsburgh AFB, New York

    DTIC Science & Technology

    1985-04-01

    Storage Area (WSA) drainage to the Salmon River, the POL and housing area drainage to Lake Champlaln, and the golf course streams and ponds drain...Sanitary Engineering; 2. Michael A. Zapkln, Project Director, M. Eng. Environmental Engineering and M.S. Biology - Team Chief and Ecologlst; 3. Andrew...college courses were offered to World War II veterans. This center became part of the State University system in 1950 and was known as Champlain College

  16. Installation Restoration Program Records Search for MacDill Air Force Base, Florida.

    DTIC Science & Technology

    1982-06-01

    in Jun 1981 to identify the potential for contamination resulting from past disposal practices. On 26-27 Jan 82, representatives of USAF OEHL, AFESC...13 May 1979 8 Major Plant Communities at MacDill AFB III - 15 9 Location Map of Possible Contaminated Areas at IV - 21 MacDill AFB 10 Historical...RCRA) and implementing regulations. The purpose of the DOD policy is to control the migration of hazardous material contaminants from DOD

  17. Installation Restoration Program Preliminary Assessment Bethel Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    third glacial stage of the Pleistocene * Epoch in North America . KNOB - A rounded eminence, as a knoll, hillock, or small hill or mountain. 3 KNOLL...Pleistocene Epoch in North America , after the Illinoian and before the Wisconsinan. SEDGE - Any of the family (Cyperaceae) of grasslike plants often found on...Pleistocene epoch in North America . I 3 GL-IO U I UREFERENCES 1. Department of the Interior List of Geological Survey Geologic and Water SupplY Reports

  18. Installation Restoration Program. Phase I. Records Search, Buckley Air National Guard Base, Aurora, Colorado.

    DTIC Science & Technology

    1982-09-01

    Buffalo and Gramma grasses. The only native trees are plains cottonwood and some willows. Many introduced species exist at Buckley, including Bluegrass...irrigation purposes. The upper sec- tion of the aquifer is unsaturated. - No rare or endangered species of plants or wildlife are found at Buckley...was then made, based upon all of the above information and utilizing the decision tree shown in Figure 4.1, concerning the existence of potential for

  19. Installation Restoration Program, Phase I: Records Search, Laughlin Air Force Base, Texas.

    DTIC Science & Technology

    1985-03-01

    and chemical * cleaning shops and consists of chromic acid, potassium permanganate, cadmium , and descaling solutions. The general trend in waste...0.016 Cadmium ɘ.010 mg/1 ɘ.010 Chromium 0.091 mg/l ɘ.050 Source: LAFB BES, 1984. STP Analysis Results, April 23, 1984. 3-33 -r --r - - - - 41 . N...consists of chromic acid, potassium permanganate, cadmium , and descaling solutions. The fire suppressants currently employed at LAFB and EPAux are AFFF

  20. Installation Restoration Program. Phase 2. Confirmation Quantification. Stage 2 for MacDill Air Force Base, Florida. Volume 2

    DTIC Science & Technology

    1988-07-22

    Inc. of Savannah, Georgia and Tallahassee, Florida provided analytical services. Michael Newberry, Captain USAF, and Jeff Mason, 2d LT., USAF, from...2803-19 AG AP6 ST;- ES Ci eit 2803-20 A? APC S -2 ES 23033-23 AG .AF6 SD-S 2803-22 AC AP6 SD-4 E.> PARAMIETER 280u- .y 2&u r 23-2: 2803-22 Bezo (g.h.1

  1. Installation Restoration Program, Phase 1. Records Search, Wheeler Air Force Base, Oahu, Hawaii

    DTIC Science & Technology

    1983-07-01

    the 3vegetation was already exotic, consisting of trees such as guava , koa haole, eucalyptus and silver oak, and shrubs and 3 grasses including lantana...Alkalioo Soap 5 gal GrounOd S~r Of f Base Fire Pit fir.Pit Of f Base PmecI" CoCAClo 20$ P 680 1S Sa.L Cro-..d tAint 10-20 gal 8w L..dt±u Off km. Thinmar

  2. Installation Restoration Program Phase 2. Confirmation/Quantification Stage 2.

    DTIC Science & Technology

    1988-04-03

    MOORE STANDARD OPERATING PROCEDURES WORK PRACTICES 1. Smoking, eating, drinking, and chewing tobacco are prohibited in the contaminated or...meter and detector are transported in a protective foam-lined case. The cell is tested before going into the field using the test feature and is...available prior to the start-up of field work, the 1"o1l ,ii . rvicts, materials, work space, and items of equipment to zu F.Vft. the nt1 tor

  3. Installation Restoration Program Phase 2. Confirmation/Quantification. Stage 2. Volume 2. Tyndall Air Force Base, Florida

    DTIC Science & Technology

    1988-08-01

    control data (lat tarK., lab spikes, and lab duplicates) in the report , as well as field quality control data. j. For those metiods which employ gas ...FORCE BASE, TEXAS 78235-5501 NOTICE This report has been prepared for the United States Air Force by Environmental Science and Engineering , Inc. (ESE...testing, field sampling, contamination assessment report preparation, and recommendations for remedial actions. U.S. Army Toxic and Hazardous Materials

  4. Installation Restoration Program Records Search for Mountain Home Air Force Base, Idaho.

    DTIC Science & Technology

    1983-07-01

    ornamental plantings. Mammals found on and around the base include coyote, black-tailed jackrabbit, cottontail, Franklin’s ground squirrel, and yellow - bellied ...Water Well Location Map. ::HILLI L - -- - • Depthin Feet Natural Ground Level Top Soil & Yellow Clay Subsoil Grey Basalt Rock-Medium Hardi30" Casing Grey... marmot as well as several varieties of small rodents. Birds which commonly nest on the base include American robin, house finch, English sparrow

  5. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for Pease Air Force Base, New Hampshire. Volume 2. Appendices.

    DTIC Science & Technology

    1987-08-01

    total recoverable trivalent - ambient water, the estimated level is 2 more sensitive than those tested. No chromium the avallabe data indicate - mg/L...freshwater aquatic chronic toxicity of trivalent chromium to life occurs at concentrations as low as sensitive saltwater aquatic life...epoxide Lindane Nethoxyohlor Diazinon Malathion Parathion Toxaphene 2.4- 2,A.5-T 2,JI,5-TP (silvex) barsenic barium cadmiumn chromium (total). copper Iron

  6. Installation Restoration Program. Phase 1. Records Search, Lowry AFB, Colorado

    DTIC Science & Technology

    1983-08-01

    donated to the * Federal Government by the City and County of Denver. By 1940, two hang- , ers had been constructed . Nine hundred and sixty adjoining...facility was under construccion . In 1958, preparation for the Titan I Missile began with the activa- tion of the 703rd Strategic Missile Wing at Lowry AFB...last T-29 departed from Lowry AFB, ending Lowry’s years as an active flying base. * . Since 1966 significant construction of dormatories and offices

  7. Installation Restoration Program. Preliminary Assessment: 183rd Tactical Fighter Group, Illinois Air National Guard, Capital Airport, Springfield, Illinois

    DTIC Science & Technology

    1990-05-01

    11140 Rockville Pike Rockville, Maryland 20852 Contract No. DLA 900-82-C-4426 Completed by Science & Technology, Inc. 704 South Illinois Avenue Suite C... Environments . .......... 111-19 IV. SITE EVALUATION...................v-i *A. Activity Review ................. v-i B. Disposal/Spill Site Identification...approximately 120 feet north of a small pond and creek located on the south side of the airport on airport property. The Base conducted operations at

  8. Soil Treatability Testing Work Plan for PCB-Contaminated Soil for McClellan AFB, California: Installation Restoration Program (IRP). Stage 7.

    DTIC Science & Technology

    1992-10-09

    1 IG° _A--- -- 1-3 i I 0o20 IEL NFr onln $o pm~ nt FApoimare) 1-2oAproxmat Bend ofeofperable Units a clla F 1290-07S. 3-3 RADIAN i COmPORATION I (RI... Marketing Office (DRMO) for receipt, storage, and resale of useable materials. The western half of the lot has been used for this purpose since it was first

  9. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Hancock Field, New York and HQTAC, Langley AFB, Virginia

    DTIC Science & Technology

    1984-10-01

    contamination resulting from previous waste disposal practices at Hancock Field .. o Recommend measures to mitigate adverse impacts at identified...best well to use in judging water quality impacts caused by the disposal activities. Slug tests (Hvorslev, 1951) were performed at each of the four... impact future samplings because this water will probably become mixed in the aquifer before the next sample round and if some remains . near the well

  10. Installation Restoration Program. Phase I. Records Search Columbus Air force Base, Mississippi.

    DTIC Science & Technology

    1985-04-01

    with the river flood plains and pine plantations on drier upland areas. Loblolly pine ( Pinus taeda) is the dominant planted pine and is used for pulp...Maintenance MCL maximum contaminant level Methyl ethyl ketone A solvent used in paint thinner, stripper, and a (MEK) wide variety of industrial...l milligrams per liter A-3 Methyl isobutyl A solvent used in paint stripper, thinner, and a - ketone (MIBK) wide variety of industrial applications

  11. Experimental Verification of a Dynamic Voltage Restorer Capable of Significantly Reducing an Energy-Storage Element

    NASA Astrophysics Data System (ADS)

    Jimichi, Takushi; Fujita, Hideaki; Akagi, Hirofumi

    This paper deals with a dynamic voltage restorer (DVR) characterized by installing the shunt converter at the load side. The DVR can compensate for the load voltage when a voltage sag appears in the supply voltage. An existing DVR requires a large capacitor bank or other energy-storage elements such as double-layer capacitors or batteries. The DVR presented in this paper requires only a small dc capacitor intended for smoothing the dc-link voltage. Moreover, three control methods for the series converter are compared and discussed to reduce the series-converter rating, paying attention to the zero-sequence voltages included in the supply voltage and the compensating voltage. Experimental results obtained from a 200-V, 5-kW laboratory system are shown to verify the viability of the system configuration and the control methods.

  12. Linking river, floodplain, and vadose zone hydrology to improve restoration of a coastal river affected by saltwater intrusion.

    PubMed

    Kaplan, D; Muñoz-Carpena, R; Wan, Y; Hedgepeth, M; Zheng, F; Roberts, R; Rossmanith, R

    2010-01-01

    Floodplain forests provide unique ecological structure and function, which are often degraded or lost when watershed hydrology is modified. Restoration of damaged ecosystems requires an understanding of surface water, groundwater, and vadose (unsaturated) zone hydrology in the floodplain. Soil moisture and porewater salinity are of particular importance for seed germination and seedling survival in systems affected by saltwater intrusion but are difficult to monitor and often overlooked. This study contributes to the understanding of floodplain hydrology in one of the last bald cypress [Taxodium distichum (L.) Rich.] floodplain swamps in southeast Florida. We investigated soil moisture and porewater salinity dynamics in the floodplain of the Loxahatchee River, where reduced freshwater flow has led to saltwater intrusion and a transition to salt-tolerant, mangrove-dominated communities. Twenty-four dielectric probes measuring soil moisture and porewater salinity every 30 min were installed along two transects-one in an upstream, freshwater location and one in a downstream tidal area. Complemented by surface water, groundwater, and meteorological data, these unique 4-yr datasets quantified the spatial variability and temporal dynamics of vadose zone hydrology. Results showed that soil moisture can be closely predicted based on river stage and topographic elevation (overall Nash-Sutcliffe coefficient of efficiency = 0.83). Porewater salinity rarely exceeded tolerance thresholds (0.3125 S m(-1)) for bald cypress upstream but did so in some downstream areas. This provided an explanation for observed vegetation changes that both surface water and groundwater salinity failed to explain. The results offer a methodological and analytical framework for floodplain monitoring in locations where restoration success depends on vadose zone hydrology and provide relationships for evaluating proposed restoration and management scenarios for the Loxahatchee River.

  13. [Nutrient dynamics in forest plantations of Azadirachta indica (Meliaceae) established for restoration of degraded lands in Colombia].

    PubMed

    Flórez-Flórez, Claudia Patricia; León-Peláez, Juan Diego; Osorio-Vega, Nelson Walter; Restrepo-Llano, Manuel Fernando

    2013-06-01

    Nutrient dynamics in forest plantations of Azadirachta indica (Meliaceae) established for restoration of degraded lands in Colombia. Azadirachta indica is a tree species which use is steadily increasing for restoration of tropical and subtropical arid and degraded lands throughout the world. The objective of this research study was to evaluate the potential of these plantations as an active restoration model for the recovery of soils under desertification in arid lands of Colombia. Litter traps and litter-bags were installed in twenty 250m2 plots. Green leaves and soil samples inside and outside this species plantations were taken, and their elemental concentrations were determined. Litterfall, leaf litter decomposition and foliar nutrient resorption were monitored for one year. The annual contributions of organic material, such as fine litterfall, represented 557.54kg/ha, a third of which was A. indica leaves. The greatest potential returns of nutrients per foliar litterfall were from Ca (4.6kg/ha) and N (2.4kg/ha), and the smallest potential returns came from P (0.06kg/ha). A total of 68% of the foliar material deposited in litter-bags disappeared after one year. The greatest release of nutrients was that of K (100%), and the least was that of N (40%). P was the most limiting nutrient, with low edaphic availability and high nutrient use efficiency from Vitousek's index (IEV = 3176) and foliar nutrient resorption (35%). Despite these plantations are young, and that they have not had forestry management practices, as an active restoration model, they have revitalized the biogeochemical cycle, positively modifying the edaphic parameters according to the increases in organic material, P and K of 72%, 31% and 61%, respectively. Furthermore, they improved the stability of aggregates and the microbe respiration rates. The forest plantation model with exotic species has been opposed by different sectors; however, it has been acknowledged that these projects derive many benefits for the restoration of biodiversity and ecosystemic functions. The conditions of severe land degradation demand the initial use of species, such as A. indica, that can adapt quickly and successfully, and progressively reestablish the biogeochemical cycle.

  14. Installation Restoration Program Phase 2. Confirmation/Quantification. Stage 1. Volume 1.

    DTIC Science & Technology

    1986-10-10

    FIGUR 1- EEA LNO EFIG I AiNLanfl GUARD BASESHOWING PHSE II INVTIGTOIE I 1- ........ Site No. - I MAA Site No.Northwest Landfill TS Site.No.4 West...Protective Steel PVC Cap Flush Mount in Casing Plastic Nelson Valve Box Land Surface PVC Cap . Cement Grout 0 L n aBentonite Pellet 4" Diameter Seal...12.0 feet BLS. Clays of high plasticity predominate in all three wells. No sand lenses were encountered and the topsoil at all three well locations is

  15. Installation Restoration Program Records Search for Langley Air Force Base, Virginia

    DTIC Science & Technology

    1982-06-01

    Septic Tanks at Langley Air Force Base 12 Location of Oil /Water Separators at Langley Air Force Base 13 Location Map of Possible Contaminated Area at...No. J.) and old vehicle dumping area (Site No. 15). A-17 Location of old underground fuel lines--possible oil -saturated area. vi FIGURES--Continued A...18 Location of old wastewater treatment plant at the Main Base Area (Site No. 2). A-19 Location of old underground oil storage tanks-possible oil

  16. Installation Restoration Program Stage 2-1 Remedial Investigation. Beale Air Force Base, Marysville, California. Volume 3. Appendix B - K

    DTIC Science & Technology

    1991-03-29

    I0IYOiHPI1 ISenu n!W .46 ,.II I J LIo Yg I 0 lf I IJliGn I r IM,I I.E_ I IVAna di mjdIIi ~ LaIIII j~inc zo- 20 III IT _______ di ~ ’n F-256 / ____CHZN...VJ is the lijit of detecticq fcr ’thit cvicmud. ba~ ern 1flutic-1. irdicates in estisated trice a lh ANAL Y ST :________________ OrRF.OED BY

  17. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 Report for Williams Air Force Base, Chandler, Arizona.

    DTIC Science & Technology

    1986-01-24

    at F7PTA, 3) old AVGAS distribution system at LFSA, and 4) southwest drainage system. Magnetic anomalies (buried drums) were identified at the...identified magnetic anomalies (buried metals) and determine whether any are pesticide drums or cans - Dispose of excavated material in an appropriate...intervals. The survey was hindered by the presence of three large iron warning signs at the site. These signs created a large magnetic anomaly in the

  18. Installation Restoration Program. Phase I. Records Search for the 5073rd Air Base Group, Shemya AFB, Alaska.

    DTIC Science & Technology

    1984-09-21

    O’Flaherty, R.W. Greiling, and B.J. Morson. A-2 [ . . . . . . .. _ . . . . . . . . . . .. ... . . . . DAVID W. ABBOTT EDUCATION University of Puget Sound , B.S...discovery of the largest aquifer system heretofor discovered in Kitsap County and perhaps in the Puget Sound lowlands. e City of Ellensburg, Washington...is a lead author of a report ’Dr EPA Region X in which she iden- tified major water uses within designated subregions of Puget Sound which could be

  19. Engineering and Development Support of General Decon Technology for the DARCOM Installation Restoration Program. Task 4. General Technology Literature Searches (II) Solidification Techniques for Lagoon Waters

    DTIC Science & Technology

    1980-12-01

    40.8 Sodium 70.1 Zinc 0.01 37 The process includes the following steps (Pichat et al., 1979): - neutralization precipitation (silicates, borates...Compressive Strength of Polyester - Encapsulated Sodium Sulfate Waste Composite ....... .............. 64 9. Deep Chemical Mixer Mounted on a Barge...zinc, copper, lead, manganese and tin; sodium salts of arsenate, borate, phosphate, iodate, and sulfide; and sulfate salts. Sulfate salts form calcium

  20. Installation Restoration Program Records Search for Air Force Plant 4, Texas.

    DTIC Science & Technology

    1984-08-01

    treatment, landfills, waste oil pits, chrome and die yard pits, disposal and spill sites. A total of 20 sites were ranked using the HARM (Hazard...Meteorology Iii-i B. Physical Geography 111-3 C. Hydrology 111-24 D. Ecology 111-44 1. Habitat 111-44 2. Threatened or Endangered Species 111-45 IV. FINDINGS A...ASSESSMENT RATING METHODOLOGY K. SITE RATING FORMS L. GLOSSARY OF TERMS M. LIST OF ACRONYMS, ABBREVIATIONS, AND SYMBOLS USED IN THE TEXT N. REFERENCES 0

  1. Installation Restoration Program. Phase 1: Records Search, Arnold Engineering Development Center (AEDC), Tennessee

    DTIC Science & Technology

    1984-10-01

    Investigations DET 816 (AFOSI) Volunteer Girl Scouts Boy Scouts, Elk River District U.S. Department of Agriculture Tennessee State Game & Fish Commission...FIGURE 34 oa LU a U. ww COOI w LU z 000 Z00 0 z 3-2. ES NGIEERIG-SCENC S° drain AEDC. Hunt and Huckleberry Creeks drain northward toward the Little ...Investigations DET 816 (AFOSI) Volunteer Girl Scouts Boy Scouts, Elk River District U.S. Department of Agricultrue Tennessee State Game & Fish Commission

  2. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1.

    DTIC Science & Technology

    1987-01-09

    Colorado and is surrounded by the cities of Denver and Aurora . The base is situated on the western edge of the Great Plains physiographic province in a...either the Denver Water Board or the City of Aurora . Lowry AFB is served by the Denver Water Board. Even though domestic water is available to all homes... Aurora in the northeastern quadrant of Colorado (Plate 2). The base was established in August 1937 on the site of the Agnes Phipps Memorial Sanitarium

  3. Installation Restoration Program. Records Search, Newark AFS, Ohio

    DTIC Science & Technology

    1985-04-01

    APPENDIX J - Aerial Photograph Newark Air Force Station . . . J-i i I I 1 I ! I iv I LIST OF TABLES No. Page 1 Potential Risk Ranking Based on Final HARM...accuracies of standards used at base level are directly traceable to the 3 Air Force Measurement Standards Laboratory at AGMC. The primary standards from...Approximately eight years ago the Base Exchange released it to the motor pool. Service is provided for all Air Force vehicles and equipment on the

  4. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 for Tinker AFB, Oklahoma. Volume 2. Appendices,

    DTIC Science & Technology

    1985-09-01

    Special Olt 9-; ~ ~ ~ ~ ~ J -..-- w--- ’- V - V --y a - . . . . . . RADIAN APPENDIX A Definitions, Nomenclatures and Units A- i . -- 5. . -, - - STAGED...contaminatg ed 11 a thei±r~ iMei S-t.r-roundlin. Review the u f -r Ai Force investigationa. These *r-esu I.ts shall~ I & prvie une eatcvr B-5 -9 V q M I ...results or highly complicated nonlinear mathematical modeling , should * be precise, clear and technically defendable. This section should clearly

  5. Superfund record of decision (EPA Region 1): Otis Air National Guard (USAF), Operable Unit 3, Falmouth, MA, September 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The Massachusetts Military Reservation (MMR) on Cape Cod, Massachusetts, lies within the boundaries of the towns of Falmouth, Mashpee, Sandwich, and Bourne. The Area of Contamination (AOC) known as Chemical Spill 3 United States Coast Guard (CS-3 (USCG)) is located on Lee Road, in the south central portion of the MMR. The Air Force Center for Environmental Excellence (AFCEE) Installation Restoration Program Office at Otis Air National Guard (ANG) Base, Massachusetts.

  6. Installation Restoration Program Records Search for Nellis Air Force Base, Nevada.

    DTIC Science & Technology

    1982-06-01

    VPAL3C CZaer:ori Sabt~rv* 1 0.22 (’tus qU~ijy PFA TWP"th’..y CSwbscore 2 0.30 plus .’.C.121 tieSakscoro x 0.24 plusTHIS ?AaE I’S B3SI QU . Fw.TV .r...Negative 4A.1 tion. Chicago 6. Illinois.) Flash Point. Tag Closed Cup. min 100’ F. 1380 F. 4.4.1 3. REQUIREMENTS1 Sulfuric add ab- sorption . max. ..- 5% 9

  7. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 Report for Beale AFB, Marysville, California. Volume 2.

    DTIC Science & Technology

    1987-05-01

    Maintarer.e ground water 2 scil borinF 8 hand auger 12 Disna:-e Area No. 10 (DA-10) - Entomology Bldg UO soil boring 6 13 Landfil: Nc. 1 (LF-1) ground...l’JSZIL I ’ SCIL SO V ; 7 ILill ( oi[ ;Q0 SO IL. $;I 60 . *O (3 .1 *, W i ; Q,. t.t WLi it hI OX aoPit IV 3 ’ Table F-1 (Cont.) 6OIOOtO LAB WPLIAT

  8. Proceedings of the Department of Defense Natural Resources Leadership Conference Held in Colorado Springs, CO on 12-16 August 1991

    DTIC Science & Technology

    1991-11-22

    the stewards of more than 25 million acres of land. Our military installations contain some of our Nation’s most sensitive and ecologically valuable...8 1 The Natural Resources Manager’s Role in the Superfund Program’s Ecological Risk Assessment M r. M att K lo...these cleanup sites are in remote parts of the country, and as such, were not of immediate concern for cleanup. Now that ecological restoration is a

  9. Commander’s Guide to Public Involvement in the Army’s Installation, Restoration Program

    DTIC Science & Technology

    1990-11-01

    posed by chemicals at the local level and for dealing with emergencies within their communities. Industry is responsible for gathering information on the...helping set up procedures to handle chemical emergencies. At the federal level, EPA is responsible for ensuring that industry complies with the law’s...2816 Agana. GU 96910 011-671-734-2671 PUERTO RICO Environmental Quality Board 204 Del Parque Street Mail to: P.O. Box 11488 Santirce, PR 00910 (809) 725

  10. Installation Restoration Program. Phase 1. Records Search: U. S. Air Force Reserve and Pennsylvania Air National Guard Facilities at Greater Pittsburgh Airport

    DTIC Science & Technology

    1984-12-01

    coupled with the enactment of environmental legislation at the Federal, state, and local levels of government , has required action to be taken to... governing the disposal of hazardous waste is the Resource Conservation and Recovery Act (RCRA), as amended. Under Section 6003 of the Act, Federal agencies...disposal sites and make information available to requesting agencies. To assure compliance with these hazardous waste regulations, DoD issued Defense

  11. Installation Restoration Program, Phase II - Confirmation/Quantification Stage I, Moody Air Force Base, Georgia.

    DTIC Science & Technology

    1985-12-01

    Confirmation/Quantification. Moody AFB- GA _____ S12. PERSONAL AUTHOR(S) .. ’ Steinberg J.A. and Thiess, W.G. 13.& TYPE OF REPORT 13b. TIME COVERED 14I. DATE...2.3.2 Soils On the high ground western portion of the base, the surface soils are mostly in the Tifton series. The soil profile consists of about 2 to...Florida Department of Environmental Regulation FWQS Florida Water Quality Standards gpd Gallons per day gpm Gallons per minute GC Gas chromatograph

  12. Installation Restoration Program. Preliminary Assessment: Nevada Air National Guard, 152nd Tactical Reconnaissance Group (TRG), Reno Cannon International Airport, Reno, Nevada.*

    DTIC Science & Technology

    1989-01-01

    survey for the southern part of Washoe Ccunty provides data on sane physical and chemical properties of soils . The data deteied to be pertinent to on...base soils is presented in Table 3, Physical and Chemical Properties of Soils Occrring on the NVANG Base in Reno, Nevada. Analyses of surface water and...NVANG Base . . . ...... .. . .. . . 111-6 3. Physical and Chemical Prperties of Soils Occrring on the NVANG Base in Reno, Nevada

  13. Installation Restoration Program Phase 2 - Confirmation/Quantification Stage 1 for Air Force Plant PJKS, Waterton, Colorado. Volume 1

    DTIC Science & Technology

    1986-10-06

    surface geophyjcal sur’.-y using electrical recistivity and magnetometer to delineate the buried -renche , to prove the e zist nc./ae~ neme. of b~r...Department of Energy’s garbage-to-gas proof of concept facility at Pompano Beach, Florida. As Co-investigator conducting Bacterial and Trace Organic...advised the bacteri - ological analyst on techniques for identification and quantitation of environmentally important bacteria. 1984-1985 Chem-Technics, Inc

  14. United States Air Force 611th Civil Engineer Squadron, Elmendorf AFB, Alaska. Final engineering evaluation/cost analysis potential tce impact to the drinking water supply, Galena Airport, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-05

    This decision document presents the selected removal action to address potential trichloroethene (TCE) impact to drinking water supply wells, located in the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit, at Galena Airport, Alaska. The information fron the RI Report is summarized, along with an analysis of potential removal action alternatives, in the Engineering Evaluation/Cost Analysis (EE/CA).

  15. United States Air Force 611th Civil Engineer Squadron, Elmendorf, AFB, Alaska. Final engineering evaluation/cost analysis, million gallon hill source area of the West Unit, Galena Airport, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-05

    This decision document presents the selected removal action for the Million Gallon Hill source area of the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit at Galena Airport, Alaska. The information from the RI Report is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).

  16. Installation Restoration General Environmental Technology Development. Task 2. Incineration Test of Explosives Contaminated Soils at Savanna Army Depot Activity, Savanna, Illinois.

    DTIC Science & Technology

    1984-04-01

    800OF and afterburner temperatures below 112000F. Explosives were detected in the combustion gases leaving the primary chamber for one test burn (i.e... combustion chamber. (c) Temperature in the secondary combustion chamber. l These key parameters were selected since they directly re- late to the...4523A 5.4 Heat exchanger (waste heat boiler) . The f lue gases discharged from the secondary combustion chamber were directed, via refractory-lined duct

  17. Installation Restoration Program (IRP). Phase 2. Confirmation/Quantification. Stage 1. McEntire Air National Guard Base, Eastover, South Carolina.

    DTIC Science & Technology

    1986-06-10

    Environmental Research Group (ERG) Laboratories of Ann Arbor, Michigan, and a duplicate set sent to OEHL’s laboratory in San Antonio, Texas. The remainder of...sites and well clusters , and the overall sparsity of data points at the base, a water table aquifer potentiometric surface map for the entire base could...L _ MW2-34 The predominant solid wastes disposed at this site were paper and domestic refuse, old wood from demolished structures, general

  18. Installation Restoration Program. Phase I: Records Search Minot Air Force Base, North Dakota.

    DTIC Science & Technology

    1984-12-01

    MAFB and Grand Forks AFB. This move localized command along with •. •• insuring that assigned units would be capable of conducting aerial...were realigned !•;>•’ to become members of the 57th AD. Also on May 1, Grand Forks AFB was \\.•/ assigned to the 4th AD at F.E. Warren AFB, Wyoming...potential for vertical - - stratification of possible ground water contaminants. During drilling, Shelby tube samples should be taken to provide soils

  19. Installation Restoration Program, Phase 2. Confirmation/Quantification, Stage 1. Kalispell Air Force Station, Montana

    DTIC Science & Technology

    1989-05-01

    AFB Statement of Work. The Phase II Stage 1 investigation of Malmstrom AFB and two off-Base sites at Shelby and Brady, Montana are described in a...Flathead National Forest Headquarters in Kalispell and the Big Fork Ranger Station in Big Fork . Because there has been litigation involved with this...reviewed by phone. An interview at the spill site was held with Mr. William Pedersen, U.S. Forest Service Ranger for the Big Fork District. He personally

  20. Installation Restoration Program. Phase 2. Confirmation/Quantification, Stage 2 for Seymour Johnson Air Force Base, North Carolina. Volume 2

    DTIC Science & Technology

    1988-11-01

    Biochem., 46, 200-208 (1972). Walter, R. L., Willis, R. D., Gutknecht, W. F., and Joyce, J. M. "An- alysis of Biological, Clinical and Environmental...Constituents (POHC) Measurements during Hazardous Waste Trial Burn Tests," Journal of the Air Pollution Control Association, 35(2), 143-147, rebruaryI 99...to June 1975. University of Virginia. Medical Technologist, Student Health Center. Performed various clinical laboratory tests, such as complete

  1. Installation Restoration Program. Phase I. Records. Loring AFB, Maine.

    DTIC Science & Technology

    1984-01-01

    forest, mixed forest, forested bogs, streams, and ponds. Managed timber lands total 4,635 acres on Loring AFB. Major harvested tree species include...Habitat 111-22 2. Threatened and Endangered Species 111-23 IV. FINDINGS IV-1 A. Activity Review IV-l 1. Industrial Waste Disposal Practices IV-1 2...Site No. 13, the BX Service Station, a number of cedar trees in the area of the fuel-saturated soil appear to have been dead for several years. 3

  2. Supercritical Fluid (SCF) Technologies: Assessment of Applicability to Installation Restoration Processes

    DTIC Science & Technology

    1994-03-10

    SCW is almost gas-like (more than 20 times below room- temperature viscosity), which creates an increase in the diffusion coefficients such that the...pounds per year of green coffee [51]. Additionally, dry CO 2 is routinely used to extract the I aroma and flavor oils from roasted coffee beans. The bitter...refrigeration and processes such as U the decaffeination of coffee beans [56]. Also, during the cleaning of the residues from metal parts, the evaporation of post

  3. Installation Restoration Program Phase 2. Confirmation/Quantification Stage 2. Bulk Fuel Storage Area Fuel Spill Investigation.

    DTIC Science & Technology

    1987-10-01

    discharged from these wells was containerized and transported to the base oil separator plant for treatment. It is estimated that approximately 25 percent...and 29). The fly ash is probably associated with the power plant tc the west of the Bulk Fuel Storage Area. Just below the fill, at 13 to 15 feet, is...been widely used in petroleum refineries and fuel terminals in response to similar spill impact situations. Although the collect ion/recov- ery

  4. Installation Restoration Program. Phase I. Records Search. Seymour Johnson Air Force Base, North Carolina.

    DTIC Science & Technology

    1982-07-01

    and waste treatment pilot plants . Developed odor control program which suc- cessfully reduced odor emissions and represented Union Carbide at a public...the runway where oil and grease has been detected as well as the discharge from the City of Goldsboro waste- water treatment plant which occurs within...There are no known threatened or en- dangered plant species on base. The only endangered animal species which may potentially inhabit the base is the Red

  5. Installation Restoration Program (IRP) Stage 3, Operable Unit B engineering Evaluation/Cost Analysis - Environmental Assessment for McClellan AFB/EM, McClellan AFB, California

    DTIC Science & Technology

    1990-12-01

    Force ......,,...Human Systems Division (AFSC) .................. . . .. . . RP Pr ra -Offic (HSDIYAO) .............. ........... Brooks Air Force...intra- system piping. Six months to one year would be required to complete and integrate these components. EECA/021491/jlh 6-39 RADIAN COlVOR AT 1O IN... system capacity has been exceeded. It is a possibility that during severe storm events, the groundwater extraction wells will be shut down to avoid

  6. Installation Restoration Program (IRP) Stage 3. McClellan Air Force Base. Operable Unit B. Preliminary Assessment Summary Report. Volume 2. Appendix B (Part 2)

    DTIC Science & Technology

    1991-10-01

    the Industrial Wastewater Collection System (IWCS) for leaks and analyzed wastewater passing through the wastewater lines (the IWL) at McClellan AFB (EG...Wastewater Collection System (IWCS) is a system of underground pipes and lift stations used to collect the wastewater from the various base processes...and work areas for treatment at one centralized Industrial Wastewater Treatment Plant (IWTP) located in OU C McClellan AFB. Most of the system is

  7. Installation Restoration Program. Stage 1. King Salmon Airport , King Salmon, Alaska

    DTIC Science & Technology

    1989-08-29

    DESCRIPTION SOILS, SEDIMENTS , SLU_ SOLIDS TREATMENT ] CONSTITUENTS OR CON., SOLIDO /F/CATION, FIXATION" - STABILIZATION AND FIX/ STABILIZATION FORM...are consistently present in site media _il, sediment , surface, and ground-I waters), and are potentially toxic to humans and the eni--ent. Suggested...Seep IV-76 4.1.5.2.3 North Barrel Bluff IV-76 4.1.5.2.4 South Barrel Bluff IV-94 4.1.6 Sediment Investigation IV-94 4.1.6.1 Eskimo Creek Seep IV-94

  8. Installation Restoration Program. Remedial Investigation Report. Minnesota Air National Guard Base Duluth International Airport, Duluth, Minnesota. Volume 1

    DTIC Science & Technology

    1990-01-01

    There are three above ground storage tanks for the storage of JP-4 jet fuel with ancillary piping, pumps, loading and unloading facilities, and...time daily basis. Workers are present to transfer jet fuel from delivery tncks to the storage tanks and from the storage tanks to fueling trucks...Ground-water flow and contaminant migration at Site 4, the fuel storage area, is generally toward the drainage ditch located immediately north of the

  9. Installation Restoration Program. Phase 2. Confirmation/Quantification Stage 2, Moody Air Force Base, Georgia. Appendices. Volume 1

    DTIC Science & Technology

    1988-11-01

    Light gray NB, clayey (kaolin). Poetv al - quartz mad to fine sand, mod. (0 Locking Cap plastic , saturated. 3 COMPILED BY B. Painter (EWM) t DATE 11-21...Painter (EUM) -SAMPLE PNTAINSOIL DESCRIIPTION COMMENTS ZTEST NAME. GRADATION OR PLASTICITY ,. DEPTH Of CASING, W ~ 1NPARTICLE SIZE DISTRIBUTION. COLOR...L. Grayish orange 10 YR 7/4. quart. RNDEVAI: very tine Sandy clay, dense, DIAMETER: 2-inrh Srhe So PVC moderately plastics dry. DEPTH: 2 - fenot[ 1

  10. Installation Restoration Program. Phase II. Confirmation/Quantification Stage 1 for George Air Force Base, California.

    DTIC Science & Technology

    1985-08-30

    technology for objective assessment of adverse effects. A Phase III requirement can be identified at any time during the program. 4. Phase IV - Operations...earth’s field can be asso- ciated with naturally occurring materials, or buried iron objects and remnant cultural features associated with man’s...for as * adequately as that of its own personnel.I 2. Obviously, such objectives can be attained only by the cooperation of all concerned. Therefore, it

  11. Installation Restoration Program. Phase 1. Records Search for the 190th Air Refueling Group, Forbes Field Air National Guard Base, Topeka, Kansas.

    DTIC Science & Technology

    1986-06-01

    l C. Review of Weston’s Report .................. IV-8 D. Critical Habitats /Endangered or Threatened Species ....... IV-13 V. CONCLUSIONS...Critical Habitats /Endangered or Threatened Species Discussions with personnel from the Kansas Department of Natural Resources disclosed that there are no...Reticulated Giraffe . This area is upgradient of the base and several miles distant, so it is not thought that the area is affected by past or present

  12. Air National Guard Installation Restoration Program Site Investigation Report, 185th Tactical Fighter Group, Iowa Air National Guard, Sioux Gateway Airport, Sergeant Bluff, Iowa

    DTIC Science & Technology

    1991-10-01

    during the RI; or to provide information for the determination that no further action is required if risks to human and environmental receptors are not...constitute an environmental risk . Exposure media and routes may differ between various organisms due to their physiological and behavioral differences...important species are relatively well documented. U Groundwater 3 Groundwater contaminants may constitute a risk to environmental receptors when

  13. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for Mather AFB, Sacramento, California. Volume 1.

    DTIC Science & Technology

    1986-06-15

    to their respective areas in the basin to 30 metres at Feather River near Marysville and 15 metres on tributaries to the Feather and Sacra- mento ...Overlain by Arroyo Seco gravels mento Valley. south of the American River. Thickness approxi- mately 100 metres and possibly up to 300 metres along...Communications with personnel from the U.S. Bureau of Reclamation Office in Sacra- mento , however, indicate that there are no major breaches in the

  14. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 for Hancock Field, New York and HQTAC, Langley AFB, Virginia.

    DTIC Science & Technology

    1984-10-01

    resulting from previous waste disposal practices at Hancock Field o Recommend measures to mitigatc, adverse impacts at identified contaminated areas o...well GW-8 is downgradient of both disposal sites and this will be the best well to use in judging water quality impacts caused by the disposal...groundwater quality and quantity samples. The amount of water added to each well was in the order of 2 to 4 gallons. This should not adversely impact

  15. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 38, Porter, New York

    DTIC Science & Technology

    1988-04-01

    drainageways collect surface runoff at the plant and channel the water off plant property. These are: the Central Drain- age Ditch, the Magazine Ditch, and...past, this drain- age system collected test area deluge waters , small spills from test- ing areas, and drainage from around the flush and maintenance...Drain- age Ditch Table 4-2 shows the results of the analyses of two water samples and one soil/sediment sample that were obtained from the drainage from

  16. Installation Restoration Program. Phase 1. Records Search, United States Air Force Academy, Colorado Springs, Colorado

    DTIC Science & Technology

    1984-12-01

    Air F~yeb o et or Departmeri1 of Defense Copies of 0tis repon may be purchased from3 National Technical Information Service 5285 Porn Roya’ Road...squirrels and skunks. Raccoons and abert squirrel popula- tions are stable, and beaver populations are declining. Black-tailed prairie dogs and jack...on prairie dog towns, which are not found on the Academy site today. Prairie falcons are rare on the base. Two eyries with four to six birds are

  17. Explosives Washout Lagoons Soils Operable Unit Supplemental Investigation Technical and Environmental Management Support of Installation Restoration Technology Development Program Umatilla Depot Activity Hermiston, Oregon

    DTIC Science & Technology

    1992-04-15

    an ofcial endorsement or approval of the use of such commercial products. This report may not be cited for purposes of advertisement . "EngineersM M7...Logs Appendix C. Laboratory Results of Soil Samples Appendix D. Concentration of Contaminants vs . Depth in Soils Appendix E. Lithologic Profiles of...dramatic difference in concentrations of explosives in areas outside the lagoons vs . concentrations beneath the lagoons. The results confirm that ES-I

  18. Installation Restoration Program. Phase I. Records Search, Brooks AFB, Texas

    DTIC Science & Technology

    1985-03-01

    decay of the cadavers occurred. The waste was packaged in plastic bags, placed in seven 55-gallon drums and buried in a hole 7 to 8 feet deep. The drums...Receptors subscore (I x factor score subtotal/maximm score subtotal) 44 - II. WASTE CARACTERISTICS A. Select the factor score based on the estimated quantity...subtotal) 44 II. WASTE CARACTERISTICS A. Select the factor score based on the estimated quantity, the degree of hazard, and the confidence level of the

  19. Installation Restoration Program. Phase 1. Records Search Andrews AFB. Maryland

    DTIC Science & Technology

    1985-06-01

    red to silvery-qrey, functions ma a conf ining bed. Formation. ~Va plastics thin lonses of pole gray silt. Ann"a Formation. ye (0-210 sand, qrsenieh...the Nanjemoy Formation (a clayey glauconi- tic sand, two to thirty feet thick) and the Marlboro Clay (a plastic clay with silt partings, two to... plastics , empty 55-gallon drums, waste lumber, tires, pipes, and hospital wastes such as unused needles and chemical reagents. In the past, Site D-4 was

  20. Installation Restoration Program. Phase II. Confirmation/Quantification Stage 1 for Nellis Air Force Base, Nevada.

    DTIC Science & Technology

    1985-08-09

    chemicals from the sample, thereby preventing any effects on sample chemistry and cross-contamination of subsequent samples. The laboratory quality...14 Top 3011 4 16 1 Ca 1 ch4DChief ’aquifer (water-ticurinr 16 69 53 i Lrowm clay fo.mation) L 69 1 74 5 . atar oaandand ,ravei from..0.to .750. 74 1 127...significant fraction of the Chemistry Department’s work involves data processing. Mathematical models, based upon analysis of standard solutions or

  1. Installation Restoration Program Records Search for Mather Air Force Base, California.

    DTIC Science & Technology

    1982-06-01

    Board, Central Valley Region Sacramento, California Mr. Stan Phillippe, Mr. Tom Pinkos, Mr. Bob Matteoli, Ms. Liese Schadt, Mr. Gregory Vaughn 916/ 322 ...Grant Ardell 916/ 322 -7166 7. California Department of Fish and Game Sacramento, California Mr. Jack Linn 916/355-7030 8. U.S. Fish and Wildlife Service...34 " A23 " Fire bluea sar.d ... ." ".......443 " S gra vel If additional space is :equired, continue on DWR Form No. 246-Soppement. -ind attach to zesp :sive

  2. Simultaneous sinus lift and implant installation: prospective study of consecutive two hundred seventeen sinus lift and four hundred sixty-two implants.

    PubMed

    Cha, Hyun-Suk; Kim, Andrew; Nowzari, Hessam; Chang, Hoo-Sun; Ahn, Kang-Min

    2014-06-01

    If less than 4 mm of residual bone is remained in posterior maxilla, two-stage operation is recommended for implant installation. However, if primary stability could be obtained using tapered designed implants, one-stage surgery could be performed with reliable success rate in severely resorbed maxilla. The purpose of this prospective study was to evaluate survival and success rates of the implants simultaneously placed into grafted sinus using rough-surfaced implant. A total of two hundred seventeen consecutive sinus lifting through lateral approach and four hundred sixty-two simultaneous implants were installed from November 2003 for 5.5 years. Xenogenic bone was used solely for bone graft materials. Second surgery was performed around 6 months after operation and porcelain fused metal or gold crown was used for definitive restorations. Cumulative survival and success rates were evaluated according to residual alveolar bone height (RABH), smoking status, and Schneiderian membrane perforation. The mean follow-up was 57.1 ± 15.6 (36-98) months. Of the four hundred sixty-two implants, two hundred sixty-two implants (56.7%: group 1) were installed in posterior maxilla less than 4-mm RABH and two hundred implants (43.3%: group 2) were placed in over 5-mm RABH. The cumulative survival and success rates were 98.91% and 96.54%. There was no statistically significant difference in success rate between group 1 and group 2 (p = .3135). Perforation of the membrane was not related to success (p = .7162), but smoking status is significantly related with implant failure (p = .0003). Sinus lifting with simultaneous implant placement could be used to treat atrophic maxilla in patients with minimal RABH when initial stability could be obtained by using taper designed implants with surgical techniques. Smoking is a possible factor for implant failure. Membrane perforation did not have an adverse effect on implant success if the membrane was repaired with absorbable membrane and fibrin glue. © 2012 Wiley Periodicals, Inc.

  3. Passing of northern pike and common carp through experimental barriers designed for use in wetland restoration

    USGS Publications Warehouse

    French, John R. P.; Wilcox, Douglas A.; Nichols, S. Jerrine

    1999-01-01

    Restoration plans for Metzger Marsh, a coastal wetland on the south shore of western Lake Erie, incorporated a fish-control system designed to restrict access to the wetland by large common carp (Cyprinus carpio). Ingress fish passageways in the structure contain slots into which experimental grates of varying size and shape can be placed to selectively allow entry and transfer of other large fish species while minimizing the number of common carp to be handled. We tested different sizes and shapes of grates in experimental tanks in the laboratory to determine the best design for testing in the field. We also tested northern pike (Esox lucius) because lack of access to wetland spawning habitat has greatly reduced their populations in western Lake Erie. Based on our results, vertical bar grates were chosen for installation because common carp were able to pass through circular grates smaller than body height by compressing their soft abdomens; they passed through rectangular grates on the diagonal. Vertical bar grates with 5-cm spacing that were installed across much of the control structure should limit access of common carp larger than 34 cm total length (TL) and northern pike larger than 70 cm. Vertical bar grates selected for initial field trials in the fish passageway had spacings of 5.8 and 6.6 cm, which increased access by common carp to 40 and 47 cm TL and by northern pike to 76 and 81 cm, respectively. The percentage of potential common carp biomass (fish seeking entry) that must be handled in lift baskets in the passageway increased from 0.9 to 4.8 to 15.4 with each increase in spacing between bars. Further increases in spacing would greatly increase the number of common carp that would have to be handled. The results of field testing should be useful in designing selective fish-control systems for other wetland restoration sites adjacent to large water bodies.

  4. {Interball-1 Plasma, Magnetic Field, and Energetic Particle Observations}

    NASA Technical Reports Server (NTRS)

    Sibeck, David G.

    1998-01-01

    Funding from NASA was received in two installments. The first installment supported research using Russian/Czech/Slovak/French Interball-1 plasma, magnetic field, and energetic particles observations in the vicinity of the magnetopause. The second installment provided salary support to review unsolicited proposals to NASA for data recovery and archiving, and also to survey ISTP data provision efforts. Two papers were published under the auspices of the grant. Sibeck et al. reported Interball-1 observations of a wave on the magnetopause with an amplitude in excess of 5 R(sub E), the largest ever reported to date. They attributed the wave to a hot flow anomaly striking the magnetopause and suggested that the hot flow anomaly itself formed during the interaction of an IMF discontinuity with the bow shock. Nemecek et al. used Interball-1's VDP Faraday cup to identify large transient increases in the magnetosheath density. They noted large variations in simultaneous Wind observations of the IMF cone angle, but were unable to establish any relationship between the cone angle variations at Wind and the density variations at Interball-1. Funds from the second installment were used to review over 20 proposals from various researchers in the scientific community who sought NASA support to restore or archive past observations. It also supported a survey of ISTP data provisions which was used as input to a Senior Review of ongoing NASA ISTP programs.

  5. Results From a Channel Restoration Project: Hydraulic Design Considerations

    USGS Publications Warehouse

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  6. Development of Multi-Functional Voltage Restore System

    NASA Astrophysics Data System (ADS)

    Suzuki, Satoshi; Ueda, Yoshinobu; Koganezawa, Takehisa; Ogihara, Yoshinori; Mori, Kenjiro; Fukazu, Naoaki

    Recently, with the dawn of the electric deregulation, the installation of distributed generation with power electronics device has grown. This current causes a greater concern of power quality, primarily voltage disturbance for power companies, and their interest in power quality is peaking. Utilities are also interested in keeping their customers satisfied, as well as keeping them on-line and creating more revenue for the utility. As a countermeasure against the above surroundings, a variety type of devices based on power electronics has been developed to protect customers' load from power line voltage disturbance. One of them is the series type voltage restore. The series device is an active device, designed to provide a pure sinusoidal load voltage at all times, correcting voltage disturbance. Series type device compensates for voltage anomalies by inserting the ‘missing’ voltage onto the line through insertion transformer and inverter. This paper shows the setting guideline of target level to compensate voltage disturbance, that is, voltage dip, voltage harmonics, voltage imbalance and voltage flicker, and the design approach of the prototype of series voltage restores to accomplish the required compensation level. The prototype system gives satisfactory compensation performance through evaluation tests, which confirm the validity and effectiveness of the system.

  7. Prioritizing Restoration in the Hangman Creek Watershed: Predicting Baseflow through Sub-basin Modeling

    NASA Astrophysics Data System (ADS)

    Navickis-Brasch, A. S.; Fiedler, F. R.

    2013-12-01

    Land use changes since European settlement have significantly impaired the beneficial uses of Coeur d'Alene (CDA) Tribe water bodies in the Hangman Creek watershed. The cumulative impacts have resulted in a 303 (d) designation by the Environmental Protection Agency (EPA), extirpated the only salmon run on the reservation, and reduced tributary connectivity by isolating many native fish populations. Considering salmon were an essential part of tribal identity and cultural activities, the tribe initiated a 100-year management plan to restore the 155,000-acre portion of the Hangman Creek watershed located on the CDA reservation. The restoration management plan focuses on sustaining subsistence and cultural activities by reestablishing stream connectivity and providing sustainable aquatic habitats as well as restoring watershed processes and improving water quality. Ultimately, the restoration goal is to improve the habitat suitability of Hangman Creek for the eventual return of salmon. To accomplish these goals, it is essential to prioritize and sequence activities that most effectively support restoration. While watershed modeling provides a commonly accepted holistic approach to simulating watershed responses, it appears the effectiveness of models in predicting restoration success, particularly with respect to the effects of restoration on baseflow, have not been well documented. In addition, creating a representative watershed model capable of accounting for a watershed scale spatial and temporal variability generally requires extensive field measurements. This presents a challenge for developing a model of Hangman Creek, since the watershed is mostly ungauged with only limited data available at a few monitoring sites. Our approach to developing a restoration prioritization plan is to first model a subbasin in the watershed with similar characteristics and restoration goals, then utilize the subbasin model to project future baseflow responses in the larger watershed. The Sheep Creek sub-basin of Hangman Creek is one of the first sites to begin restoration and potentially reestablish 2.1 miles of the tributary connectivity to Hangman Creek by realigning the creek back to its historical path. In this work we prioritize restoration efforts based on predicted baseflow responses to restoration using a subbasin model of Sheep Creek. This model will first be calibrated to the extent possible with current alignment groundwater and streamflow data. Then using available ground water and streamflow data collected after the creek is realigned, baseflow response to restoration in the newly aligned Sheep Creek will be predicted and compared to actual conditions. Additional data available for creating the subbasin model includes a newly installed weather station and stream gauge, liDar data, and recently monitored water quality conditions. This poster will present the details of the approach and initial results, and will explicitly consider how the interdisciplinary aspects of the project inform the approach.

  8. Restoring Sustainable Forests on Appalachian Mined Lands for Wood Products, Renewable Energy, Carbon Sequestration, and Other Ecosystem Services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James A. Burger; J. Galbraith; T. Fox

    2005-12-01

    The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. We are currently estimating the acreage of lands in Virginia, West Virginia, Kentucky, Ohio, and Pennsylvania mined under SMCRA and reclaimed to non-forested post-mining land uses that are not currently under active management, and therefore can be considered as available for carbon sequestration. To determine actual sequestration under different forest management scenarios, a field study was installed as a 3 x 3more » factorial in a random complete block design with three replications at each of three locations, one each in Ohio, West Virginia, and Virginia. The treatments included three forest types (white pine, hybrid poplar, mixed hardwood) and three silvicultural regimes (competition control, competition control plus tillage, competition control plus tillage plus fertilization). Each individual treatment plot is 0.5 acres. Each block of nine plots is 4.5 acres, and the complete installation at each site is 13.5 acres. Regression models of chemical and physical soil properties were created in order to estimate the SOC content down the soil profile. Soil organic carbon concentration and volumetric percent of the fines decreased exponentially down the soil profile. The results indicated that one-third of the total SOC content on mined lands was found in the surface 0-13 cm soil layer, and more than two-thirds of it was located in the 0-53 cm soil profile. A relative estimate of soil density may be best in broad-scale mine soil mapping since actual D{sub b} values are often inaccurate and difficult to obtain in rocky mine soils. Carbon sequestration potential is also a function of silvicultural practices used for reforestation success. Weed control plus tillage may be the optimum treatment for hardwoods and white pine, as any increased growth resulting from fertilization may not offset the decreased survival that accompanied fertilization. Relative to carbon value, our analysis this quarter shows that although short-rotation hardwood management on reclaimed surface mined lands may have higher LEVs than traditional long-rotation hardwood management, it is only profitable in a limited set of circumstances.« less

  9. Using Geomorphic Change Detection to Understand Restoration Project Success Relative to Stream Size

    NASA Astrophysics Data System (ADS)

    Yeager, A.; Segura, C.

    2017-12-01

    Large wood (LW) jams have long been utilized as a stream restoration strategy to create fish habitat, with a strong focus on Coho salmon in the Pacific Northwest. These projects continue to be implemented despite limited understanding of their success in streams of different size. In this study, we assessed the changes triggered by LW introductions in 10 alluvial plane bed reaches with varying drainage areas (3.9-22 km²) and bankfull widths (6.4-14.7 m) in one Oregon Coast Range basin. In this basin, LW was added in an effort to improve winter rearing habitat for Coho salmon. We used detailed topographic mapping (0.5 m² resolution) to describe the local stream and floodplain geometry. Pebble counts were used to monitor changes in average substrate size after the LW addition. Field surveys were conducted immediately after the LW were installed, in the summer of 2016, and one year after installation, in the summer of 2017. We used geomorphic change detection analysis to quantify the amount of scour and deposition at each site along with changes in average bankfull width. Then we determined the relative amount of change among all sites to identify which size stream changed the most. We also modeled fluctuations in water surface elevation at each site, correlating frequency and inundation of the LW with geomorphic changes detected from the topographic surveys. Preliminary results show an increase in channel width and floodplain connectivity at all sites, indicating an increase in off-channel habitat for juvenile Coho salmon. Bankfull widths increased up to 75% in small sites and up to 25% in large sites. Median grain size became coarser in large streams (increased up to 20%), while we saw a similar amount of fining at smaller sites. The overall increase in channel width is compensated by an overall decrease in bed elevation at both large and small sites, suggesting the maintenance of overall geomorphic equilibrium. Further work will include quantifying these geomorphic changes in the context of critical salmon habitat factors. By identifying which size stream changes the most after LW introduction, and linking this change to salmon habitat metrics, we will provide information to aid in optimizing future LW stream restoration efforts that focus on stream reaches likely to experience the greatest increase in fish habitat.

  10. Comparison of DOE and Army Advisory Boards: Application of a Conceptual Framework for Evaluating Public Participation in Environmental Risk Decision Making

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Branch, Kristi M.; Bradbury, Judith A.

    This article is part of a growing body of literature evaluating public participation approaches and implementation efforts. It compares the characteristics and performance of citizen advisory boards established by the U.S. Department of Energy's Environmental Restoration and Waste Management Program (DOE/EM) and by the U.S. Department of Defense's Army (DoD/Army) as a major part of the public participation programs that were undertaken to help the agencies plan and implement the cleanup of their contaminated installations. We first present the elements of the Acceptability Diamond, an evaluative framework developed by the authors through extensive fieldwork on public-federal agency interactions that identifymore » five objectives of agency/public interactions and public participation programs, and link them to existing literature. We then use the Acceptability Diamond as a basis for comparing the performance of the DOE/EM and DoD/Army advisory boards. In the early 1990s, both DOE and DoD participated in the Federal Facilities Environmental Restoration Dialogue Committee (known as the FFER Dialogue Committee) and were influenced by the Committee's recommendations on public participation. However, the Site Specific Advisory Boards (SSABs) subsequently established by DOE/EM and the Restoration Advisory Boards (RABs) subsequently established by DoD and the Army were governed by significantly different policies and management. We describe some of these key differences and compare the performance of the SSABs and RABs. The article draws on a series of research studies conducted by the authors on the DOE/EM public participation program from its inception in the early 1990s through its transition to accelerated cleanup in 2002 and also on a recently completed study of seven Army RABs.« less

  11. RESTORING SUSTAINABLE FORESTS ON APPALACHIAN MINED LANDS FOR WOOD PRODUCTS, RENEWABLE ENERGY, CARBON SEQUESTRATION, AND OTHER ECOSYSTEM SERVICES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James A. Burger; J. Galbraith; T. Fox

    2005-06-08

    The overall purpose of this project is to evaluate the biological and economic feasibility of restoring high-quality forests on mined land, and to measure carbon sequestration and wood production benefits that would be achieved from forest restoration procedures. We are currently estimating the acreage of lands in VA, WV, KY, OH, and PA mined under SMCRA and reclaimed to non-forested post-mining land uses that are not currently under active management, and therefore can be considered as available for carbon sequestration. To determine actual sequestration under different forest management scenarios, a field study was installed as a 3 x 3 factorialmore » in a random complete block design with three replications at each of three locations, Ohio, West Virginia, and Virginia. The treatments included three forest types (white pine, hybrid poplar, mixed hardwood) and three silvicultural regimes (competition control, competition control plus tillage, competition control plus tillage plus fertilization). Each individual treatment plot is 0.5 acres. Each block of nine plots is 4.5 acres, and the complete installation at each site is 13.5 acres. During the reporting period we compiled and evaluated all soil properties measured on the study sites. Statistical analysis of the properties was conducted, and first year survival and growth of white pine, hybrid poplars, and native hardwoods was assessed. Hardwood species survived better at all sites than white pine or hybrid poplar. Hardwood survival across treatments was 80%, 85%, and 50% for sites in Virginia, West Virginia, and Ohio, respectively, while white pine survival was 27%, 41%, and 58%, and hybrid poplar survival was 37%, 41%, and 72% for the same sites, respectively. Hybrid poplar height and diameter growth were superior to those of the other species tested, with the height growth of this species reaching 126.6cm after one year in the most intensive treatment at the site in Virginia. To determine carbon in soils on these sites, we developed a cost-effective method for partitioning total soil carbon to pedogenic carbon and geogenic carbon in mine soils. We are in the process of evaluating the accuracy and precision of the proposed carbon partitioning technique for which we are designing an experiment with carefully constructed mine soil samples. In a second effort, as part of a mined land reforestation project for carbon sequestration in southwestern Virginia we implemented the first phase of the carbon monitoring protocol that was recently delivered to DOE.« less

  12. Designing stream restoration structures using 3D hydro-morphodynamic numerical modeling

    NASA Astrophysics Data System (ADS)

    Khosronejad, A.; Kozarek, J. L.; Hill, C.; Kang, S.; Plott, R.; Diplas, P.; Sotiropoulos, F.

    2012-12-01

    Efforts to stabilize and restore streams and rivers across the nation have grown dramatically in the last fifteen years, with over $1 billion spent every year since 1990. The development of effective and long-lasting strategies, however, is far from trivial and despite large investments it is estimated that at least 50% of stream restoration projects fail. This is because stream restoration is today more of an art than a science. The lack of physics-based engineering standards for stream restoration techniques is best underscored in the design and installation of shallow, in-stream, low-flow structures, which direct flow away from the banks, protect stream banks from erosion and scour, and increase habitat diversity. Present-day design guidelines for such in-stream structures are typically vague and rely heavily on empirical knowledge and intuition rather than physical understanding of the interactions of the structures the flow and sediment transport processes in the waterway. We have developed a novel computer-simulation based paradigm for designing in stream structures that is based on state-of-the-art 3D hydro-morphodynamic modeling validated with laboratory and field-scale experiments. The numerical model is based on the Curvilinear Immersed Boundary (CURVIB) approach of Kang et al. and Khosronejad et al. (Adv. in Water Res. 2010, 2011), which can simulate flow and sediment transport processes in arbitrarily complex waterways with embedded rock structures. URANS or large-eddy simulation (LES) models are used to simulate turbulence. Transport of bed materials is simulated using the non-equilibrium Exner equation for the bed surface elevation coupled with a transport equation for suspended load. Extensive laboratory and field-scale experiments have been carried out and employed to validate extensively the computational model. The numerical model is used to develop a virtual testing environment within which one or multiple in-stream structures can be embedded in representative live-bed meandering waterways and simulated numerically to systematically investigate the sensitivity of various design and installation parameters on structure performance and reliability. Waterway geometries are selected by a statistical classification of rivers and streams to represent typical sand-bed and gravel-bed systems found in nature. Results will be presented for rock vanes, J-hook vanes and bendway weirs. Our findings provide novel physical insights into the effects of various in-stream structures on turbulent flow and sediment transport processes in meandering rivers, underscore these effects for different stream-bed materials, and demonstrate how such physics-based analysis can yield design guidelines that often challenge what is commonly done in practice today. To our knowledge, our work is the first systematic attempt to employ advanced numerical modeling coupled with massively parallel supercomputers to design hydraulic structures for stream restoration. This work was supported by NSF Grants EAR-0120914 and EAR-0738726, National Cooperative Highway Research Program Grant NCHRP-HR 24-33.

  13. Installation Restoration Program. Phase I. Records Search, Hazardous Materials Disposal Sites. Myrtle Beach Air Force Base, South Carolina.

    DTIC Science & Technology

    1981-10-01

    Geography 3-1 Topography 3-. Drainage 3-1 ii Page Surface Geology 3-3 Barrier Sediments 3-3 Myrtle Beach Backbarrier Sediments 3-3 soils 3-5 Subsurface...Beach AFB Surface Drainage and Surface Water Sampling Points 3-2 3.2 Myrtle Beach AFB Surface Soils 3-4 3.3 Myrtle Beach AFB Location of Geologic Cross...has created a potential contamination problem. This situation is compounded by the site’s sandy soil and shallow ground water table. b.) Weathering Pit

  14. Installation Restoration Program. Remedial Investigation Report: Forbes Field Air National Guard Base, Topeka, Kansas

    DTIC Science & Technology

    1989-10-01

    of toluene in the gastrointestinal tract occurs less readily. Toluene is distributed in the highest concentrations to adipose tissue followed by bone...were desorbed using a thermal desorption unit. Samples were injected by a desorber into a capillary column which was followed by quantification with...0.002 beryllium 0.1 0.001 cadmium 0.5 0.005 chromium 1 0.01 copper 1 0.01 lead 3 0.002 mercury 0.02 0.001 nickel 2 0.02 selenium 0.2 0.002 silver 0.5

  15. Installation Restoration Program. Preliminary Assessment: 137th Tactical Airlift Wing, Oklahoma Air National Guard, Will Rogers World Airport, Oklahoma City, Oklahoma

    DTIC Science & Technology

    1989-02-01

    contrac: b. Stitt b) Oklahoma L a) Motor housings, junction and switch boxes, ocher a. Arvua o be Avoided electrical equipment I b. Azau to beTreated w...REPORT DOCUMENTATION PAGE ! ,a,,mo i.,e0q 8 1. AGENCY USE ONLY ’ L -ave aianK) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED l February 1989 Final...recommendations for further action. The subcontractor effort was conducted by the following Science & Technology, Inc. (SciTek) personnel: Mr. Tracy C. Brown

  16. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Volume 1.

    DTIC Science & Technology

    1987-04-29

    Dichlorobenzene 4000.0 U.S. EPA estimate of safe levels of toxicants in drinking water for human health effects (Federal Register. 28 November 1980). (2... Plastic bottle 40C 500 ml TOC Glass bottle 40 C; H 2 So4 to pHɚ 250 al Metals Plastic bottle HNO3 to pHɚ 500 ml Volatile organics Glass vial with 40C... safe levels of toxicants in drinking water for human health effects (Federal Register. 28 November 1980). 4-3 TABLE 4-2. REGULATORY GUIDELINES OR

  17. Engineering and Development Support of General Decon Technology for the U.S. Army’s Installation Restoration Program. Task 7. Literature Search & Evaluation of Compatibility Testing of Waste Containment Barrier Materials

    DTIC Science & Technology

    1982-03-01

    plyethylene PVC landfill- HypalonM PE, CPE, neoprene, EPDM ,* bentqcnite ethylene propylene rubber elasticized polvoleiin 20. A94V C? (Coit" an 0*V" aid...materials include Hyralon®, butyl rubber , EPDM , CPE, neo- prene, polyethylene, polypropylene, PVC8 and elasticized polyolefin. With all of these...and animal and vegetable fats and oils (Geswein, 1975). EPDM , or etiylene propylene rubber , is a terpolymer of ethylene, propylene and a small amount

  18. Installation Restoration Program Stage 2-1 Remedial Investigation. Beale Air Force Base, Marysville, California. Volume 1. Text and Plates

    DTIC Science & Technology

    1991-03-29

    laboratory. In addition, weather conditions (i.e., cloud cover, pre- cipitation, air temperature, and wind speed and direction), water clarity, and...carried over a 25-foot grid in this area. The weather at the time of emissions screening was mostly sunny with high clouds . The wind was 3 to 5 knots...TRIBUTARY TO HUTCHINSON CREEK SOIL GOMMIG ANGLED 300 FROM VERTICAL Ae o * SOL. 90011GM VERTICAL 0 100, o SURFACE SOIL SAMPLE AU. VALUES ARE IN mg/Kg MONITORIG

  19. Engineering and Development Support of General Decon Technology for the DARCOM Installation Restoration Program. Task 2. Treatment of Explosives Contaminated Lagoon Sediment. Phase I. Literature Review and Evaluation

    DTIC Science & Technology

    1980-11-01

    hr incineration rate are presented in Table 15. These costs include dredging equipment, flat bed trailer and afterburners and venturi scrubbers where...require further treatment before they can be released into the environment, i.e. biological degradation for the liquid and specific scrubbers for the...The wet-air units are equipped with wet scrubbers to remove air emissions. Air emissions are expected to contain at a minimum CO, C0 2 ,N2 , 0, and

  20. The Installation Restoration Program Toxicology Guide. Volume 2

    DTIC Science & Technology

    1987-05-01

    the number of extra responses made during exposure. An increase in response time 5/87 3V.WI UW V VýWVVWtW’.W1 VWJW.W W W VWVWW.WVVW MRVW W \\V -VW W i Ri...toxicity as shown by a decreased maternal weight gain. Minor anomalies in fetal development included an extra lumbar rib and delayed ossification of... lumbar spurs (57 vs. 18 in the control group) and a delayed vertebrae centra ossification (19 vs. 4 in the control group). No teratogenic response was

  1. Installation Restoration Program. Remedial Investigation Report: Minnesota Air National Guard Base Duluth International Airport, Duluth, Minnesota. Volume 6

    DTIC Science & Technology

    1990-01-01

    reporting limit. Acceptable RPD in this case is defined as duplicate values within one detection limit of each other. I I I I I I i I i 2567I88-A1...analysis shois the :aboratory to be in ccn:rol. Results for Sa:Dle No. 88092.739 are reported on a wet weight basis, since percen:age moisture was...describes the remedial actions performed on sites confirmed to contain hazardous waste contamination which endangers the human health. The actions

  2. Installation Restoration Program. Phase 1. Records Search, Kelly AFB, Texas

    DTIC Science & Technology

    1982-02-01

    1000-1500 gallons per year based on two training sessions per year. The ultimate BOD of AFFF ( FC -780B, manufactured by 3M) is 370,000 mg/l in...Landfill 1917-1942 44 24 FC -i Fire Control Training Area ?-1950’s 42 25 FC -2 Fire Control Training Area 1950’s-1981 41 26 RD-i Radioactive Disposal Area...were buried had very short half-lifes. This site received a low score of 45. 6) Fire Control Training Areas a. The Fire Control Training Areas FC -I and

  3. Installation Restoration Program. Phase 1: Records Search, Blytheville Air Force Base, Arkansas

    DTIC Science & Technology

    1985-08-01

    AFB LOCATION OFI 0 LS U FC MIDDLE S RA EWATER MARKER MONITORING SITESI SL *LEGEND S SURFACE WATER QUALITY IMONITORING SITEI. iJ I WASTEWATER PLANTr j...burning is scored in a small above ground tank located near the FPTA. The extinguishing agent used during this time period was AFFF (aqueous film...receptors, "aste caracte,stics, and pst .ways. Receptors 54 Waste Char’acteristics 54 Pathways 74 Total 183 div~ied by 3 E ’I 3,’osi : --e E. P

  4. Installation Restoration Program (IRP) Site Investigation Report for IRP Site Number 4. Volume 3. Appendices D-I. 128th Air Refueling Wing, Wisconsin Air National Guard, General Billy Mitchell Field Air National Guard Base, Milwaukee, Wisconsin.

    DTIC Science & Technology

    1996-03-01

    NATIONAL GUARD GENERAL BILLY MITCHELL FIELD AIR NATIONAL GUARD BASE MILWAUKEE, WISCONSIN MARCH 1996 ______ 19960509 134 HQ ANG/CEVR ANDREWS AFB...Report for IRP Site No. 4, Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin - Volume III...Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin, Volume III - Appendices D-I. This is the

  5. Installation Restoration Program. Phase I: Records Search. Sunnyvale Air Force Station, California

    DTIC Science & Technology

    1985-07-01

    00 a-l Wa-- jzI0 UJ~ *20- * -J J uSl a J~rL 0 9U * de 0~>a j~ ~ W ’./ IL system was also determined to warrant review and modification under the base...in the HARM scoring system to numerically assess the pollutant transport mechanisms and potential receptors present at the site. App. G describes the...Note: RUTA wll field locatiom am dvou in Fig. 3.4-1. SS (EPA, 1964b). tNI. (EPA, 1984). Notle: pci/i - Picocuries per liter. Sources: UIGAEII, 1978

  6. Installation Restoration Program. Phase 1. Records Search for the Ohio National Guard, Rickenbacker Air National Guard Base, Columbus, Ohio.

    DTIC Science & Technology

    1987-06-01

    Each of these sites involves POL releases, detection of which is amenable to geophysical/geochemi- cal methods . ES-8 I A I A I I I I ~ i I I ii I VN...Precipitation in Columbus, Ohio, averages 36.71 inches per year. By calcu- lating net precipitation according to the method outlined in the Federal Regis- ter...spill absorption devices. Fuel that was not recovered either evaporated, was absorbed into the ground, or entered the base drainage system from the west

  7. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 38, Porter, New York, RCRA (Resource Conservation and Recovery Act) Sites

    DTIC Science & Technology

    1988-04-01

    sites throughout Alaska, Idaho , Oregon, and Washington, including work at 10 sites on the National Priorities List. Major geohydrologic investigations...Mary’s Hospital, 5300 Military Rd., Lewiston , 278-4000 Hospital Emergetcy Room Niagara Falls Memorial Medical Center, 621 10th N.F. 278-4000 Poison...Hospital ( Lewiston ): Exit AFP 38; head West on Balmer Road; Turn left and head south on State Highway 18; Turn left on State Highway 104 ( Lewiston Rd

  8. Installation Restoration Program Phase 1: Records Search of Hanscom Air Force Base, Massachusetts

    DTIC Science & Technology

    1984-08-01

    Engineer o Kevin R. Boyer, P.E., Project Manager and Civil Engineer o Alfred N. Wickline, Records Search Team Leader and Soil Scientist o Claudia A...INVESTIGATION TEAM :I.., 𔃾 44. ’m4, Use or disclosure of proposal data is subject to the restriction on the Title page of this Proposal. KEVIN R... KEVIN R. BOYER, P.E. Page 2 of 3 While working under the USEPA’s Field Investigation Team (FIT) program, Mr. Boyer was part of a quality assurance (QA

  9. Installation Restoration Program. Phase I. Records Search, Hazardous Materials Disposal Sites, Griffiss AFB, New York.

    DTIC Science & Technology

    1981-07-01

    Disposal Methods 4-31 Evaluation of Past and Present Waste 4-35 Disposal Facilities Landfills 4-35 Dry Wells 4-37 Rating of Waste Disposal Sites 4-37 V 2...Problems Identified at GAPE Landfills 4-36 4.12 Priority Ranking of Potential 4-38 Contamination Sources 4.13 -4.31 Rating Forms for Waste Disposal Sites 4...39 -4-76 5.1 Priority Ranking of Potential Con- 5-2 tamination Sources B.1 Rating Factor System B-2 -B-5 4W EXECUTIVE SUMMARY The Resource

  10. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 for Cannon AFB, New Mexico. Volume 1. Text.

    DTIC Science & Technology

    1986-03-24

    interbedded sands and silts in5 the lower portion of the profile. The sand units within the caliche are gen- erally pink . quartzose. fine grained and...C1426 I- 0 .J C U-I 0 c 0 o .1. 00 44I -14 u -4 >u~ 0i c FloI ~ -r4 ra t-o 14 co 00 z -4 -t cc ’w4t ibe 4-39 C1426 ~-~-~2 o IL _ Cl) 0*l *IJ. *0 0 00 U.U 0

  11. Installation Restoration Program. Preliminary Assessment: 232nd Combat Communications Squadron, Montgomery Air National Guard Station, Alabama Air National Guard, Montgomery, Alabama

    DTIC Science & Technology

    1991-02-01

    analysis of water, soil, and/or sediment samples, are required. Careful documentation and quality control procedures in accordance with CERCLA/SARA...I III-1 I I Northern Piedmont * AI Southern Piedmont a’.3 Cahaba Valley... ...... Coosa ValleyI Fall Line Hills Aluvial Plain Black Prairie3 Cu enu e...no surface outlet; (b) A drainage basin or river basin; (c) A low area in the Earth’s crust, of tectonic origin, in which sediments have accumulated

  12. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 2. Volume 1. Luke Air Force Base, Arizona.

    DTIC Science & Technology

    1988-06-15

    equipped with an oil/water separator. Separated oil would be collected for reuse or proper disposal, and water would be piped to the Sewage Treatment...1940’s. The STP is located on Glendale Avenue, approximately 2 miles east of the Main Base, and adjacent to the Agua Fria River as shown in Figure 1-7...flow. The effluent from the STP is discharged into a canal that flows into lagoons in the dry Agua Fria River bed. The treated efflu- ent is routinely

  13. Installation Restoration Program. Preliminary Assessment: Gulfport Air National Guard Field Training Site Gulfport - Biloxi Regional Airport, Gulfport, Mississippi

    DTIC Science & Technology

    1988-04-01

    Liability Act of 1980 (CE2LA, Public Law 96-510) commonly known as "Superfund". In August 1981, the President delegated certain authority specified...to these wells. Two of these wells are no longer used. The well located about 200 feet southeast of Dilding 96 is listed as a public suply well by the...any organism, either directly fron the enviroamnt or , iirectly by ingestion through food chains , will or may reasonably be anticipated to cause death

  14. Installation Restoration Program. Preliminary Assessment: 112th Tactical Control Squadron and 114th Air Traffic Control Flight, State College Air National Guard Station, Pennsylvania Air National Guard, State College, Pennsylvania

    DTIC Science & Technology

    1991-02-01

    and the Upper Cambrian age Gatesburg formation crop out (Figure 111.3). Specifically, the Station location is shown to be underlain by the Stonehenge ...the Larke formation is generally absent in this part of Centre County, and a hiatus exists between the Stonehenge formation and the underlying Gatesburg...formation. Therefore, the Stonehenge formation exists unconformably in contact with the Mines member of the Gatesburg formation. In addition, the

  15. Installation Restoration Program (IRP). Aircraft Parking Apron Area. Volume 1. 152nd Reconnaissance Group, Nevada Air National Guard, Reno-Cannon International Airport, Reno, Nevada

    DTIC Science & Technology

    1994-06-01

    Loeltz, 1964, Evaluation of Hydroeeology and Hydrochemistry of the Truckee Meadow Area. Washoe County. Nevada. U. S. Geological Survey, Water I Supply...was detected in water samples collected from all monitoring wells. A concentration of I 0.055 ppm for the water sample collected from monitoring well...MWO8 during the first round of sampling (MW08-(1)), exceeded the federal drinking water standard of 0.05 ppm. The I background concentration for lead

  16. Installation Restoration Program, Phase 2. Confirmation/Quantification, Stage 2, Hancock Air National Guard Base, Syracuse, New York. Volume 2. Appendices

    DTIC Science & Technology

    1989-06-01

    4) 0) C)-D C 0401 C) 0 -c eL4 CD CD r, r- *,-A (mz61L 00 rC- 4ic 0Cm q) CD) C) -DC DC )C wl ~ ~ ’ %0 0 0 0 koko%04 4 J 4 J I+ C-M 44. 0 4J 44) -) 4...SAC) and 5,6-Dihydro-5-Azacytidine (H5AC) in L1210 Cell Culture Samples by Gas Chromatography (GC) and Mass Spectrometry (MS), C.J. Nielson, S.W

  17. Installation Restoration Program. Phase 2. Confirmation/Quantification Stage 1 for Pease Air Force Base, New Hampshire. Volume 1.

    DTIC Science & Technology

    1987-08-01

    01 0 4 In w el4 ’ n r fl f4 r, V 0 𔃾 1" * * * - ~ m ~c- I0 1-0- Q~ 3c 3c~ AdI-. * tp~dip Eu - 4j :: .( - * -U I’ -L - UJ a. Zw a Inc., ɘ L.3. 2-3...swale ap- proximately 100 feet south of Building 222 (Figure 3-7), the Jet Engine Test cell . With the exception of VOC, all param- eters detected at 15-B

  18. Installation Restoration Program (IRP) for IRP Sites Numbers 4, 5, 7 and 14. 152 Tactical Reconnaissance Group, Nevada Air National Guard, Reno Tahoe International Airport, Reno, Nevada

    DTIC Science & Technology

    1996-01-01

    For: HQ/ANG/CEVR Andrews AFB, Maryland Prepared By: ERM-West, Inc. 5111. N. Scottsdale Road, Suite 108 ERM Scottsdale, Arizona 85250 FINAL Document...predominantly andesite and andesite porphyry flow rock, hypabyssal intrusives, and minor siliceous welded tuff, which are commonly represented by the Kate...TERTIARY ROCKSI tuslýýj porphyry and olcomic brii I SOURCE ORNL/ETS. 1994 GEOLOGIC MAP OF THE FIGURE 3-1 RENO. NEVADA AREA 152nd TACTICAL RECONNAISSANCE

  19. Thermal Desorption/Ultraviolet Photolysis Process Technology Research, Test, and Evaluation Performed at the Naval Construction Battalion Center, Gulfport, Mississippi, for the USAF Installation Restoration Program. Volume 2

    DTIC Science & Technology

    1987-12-01

    protection needs to be changed, then protection will be upgraded, or downgraded, as appropriate. 5 . Cartridges for air-purifying respirators will be...the gloves, the legs taped to the boots, and the hood to the respirator (if appropriate). All openings shall be sealed. 5 . The protective coveralls...placed next to the trash container. Note: Suits are to be removed in an inside out fashion. m. Station 5 - Respirator Removal A rack will be available to

  20. Installation Restoration Program. Remedial Investigation Report. Site 1. Fire Training Area. Volk Field Air National Guard Base, Camp Douglas, WI. Volume 2

    DTIC Science & Technology

    1990-07-01

    trobenzen. 660’ ug/KG Phenacet in 6600 ug/KG 2- Picoline 660’ ug/KG Pronamide 10000 ug/KG 1,2,4, 5-Tetrachlorobenzene 660’ ug/KO 0 Denotes instrument...Phenacetin ND 2- Picoline ND Pronamide ND 1,26,4,5-Tetrachlorobenzene -*ND *EPA has not yet determined detection limits for these compounds E-158 I Pr...ND N-Nitrosopiperidine - ND Pentachlorobenzene ND Pentachloromitrobenzene -*ND Phenacetin ND 2- Picoline ND Pronamide - *ND 1,2,4,5

  1. Management of an Anophthalmic Patient by the Fabrication of Custom Made Ocular Prosthesis

    PubMed Central

    SINGH, Meenakshi; NAYAK, Meghanand; SOLANKI, Jitender; GUPTA, Sarika; SINGH, Anjali

    2015-01-01

    The loss or disfigurement of a body parts specially that pertaining to the face has a deep psychological and social impact on the patient. After enucleation, evisceration or exteneration of the eye, the aim of an ocular prosthesis should be to restore the natural appearance, install confidence and a sense social acceptability in the patient. Custom made prosthesis has several advantages over the stock eye prosthesis. This article illustrates rehabilitation of the enucleated right eye of a patient with a custom made ocular prosthesis. PMID:26715901

  2. Installation Restoration Program Phase 2. Confirmation/Quantification Stage 1 for Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland. Volume 2. Appendices

    DTIC Science & Technology

    1985-10-01

    bromochioromethane. 2-bromo- 1 - 8.2.3. check standard containing each parameter chloropropane . and 1.4-dichlorobutane is 8&.2 Beginning with Section...Modification 1 (IRP Stage 1 , Otis ANGB) Roy F Weston Attn: Pete Marks Weston Way West Chester PA 19380 1 . The Goverment is contemplating assignment of the...delivery order described in Atch 1 hereto under the subject contract, Pertinent details are included in Atch 1 and herein. Request Contractor

  3. Installation Restoration Program Environmental Technology Development. Biodegradation of DIMP, Dieldrin, Isodrin, DBCP, and PCPMSO in Rocky Mountain Arsenal Soils

    DTIC Science & Technology

    1989-01-30

    D-007 & Hazardous Materials Agency 1 CETHA-TE Task No. 11 . ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS ATTN: CETHA-TE-D...PROGRAM IPROJECT TASK IWORK UNIT Aberdeen Proving Ground, MD 21010-5401 ELEMENT NO. NO. NO. ACCESSION NO. 1 . TITLE (Include SecurityClassification...Peter J. Marks 3a. TYPE OF REPORT 13b. TIME COVERED T14. DATE OF REPORT (Year, Month, Day) 115. PAGE COUNT Final FROM 1 /87 TO_1/89 11989 January 3 6

  4. Biodegradation of DIMP, Dieldrin, Isodrin, DBCP, and PCPMSO in Rocky Mountain Arsenal Soils. Installation Restoration Program, Environmental Technology Development

    DTIC Science & Technology

    1989-01-01

    Number DAAK- 1 1 -85-D-007 Report Number CETHA-TE-CR-89006 January 1989 Prepared for: COMMANDER, U.S. ARMY TOXIC AND HAZARDOUS MATERIALS AGENCY Aberdeen...UNIT Aberdeen Proving Ground, MD 21010-5401 ELEMENT NO. NO. NO. ACCESSION NO. 1 . TITLE (Include Security Classification) - Biodegradation of DIMP...TYPE OF REPORT 113b. TIME COVERED 114. DATE OF REPORT (Year, Month, Day) 15. PAGE COUNT Final I FROM 1 /87 TO_1/89 1989 January 30 6. SUPPLEMENTARY

  5. Operable Unit B Remedial Investigation Sampling and Analysis Plan. Installation Restoration Program (IRP) McClellan Air Force Base

    DTIC Science & Technology

    1991-11-01

    R A DIA N.... cCELA AFB CALIFRNI55259......... ... RADIAN C 0 37 54 0 z is T 1 0 10395 Old Placcrvillc Road Sacramcnto, CA 95827 191461362-5 H3 2...SAME AS r __ OTic usERs Undlassified 22a. NAME OF RESPONSIBLE INDIVIDUAL 22b. TELEPHONE oncoude Area Code) 22c. OFFICE SYMBOL Mr. P. Haas 1 -800-821...Page 1.0 INTRODUCTION .................................... . 1 - 1 2.0 SITE DESCRIPTION .................................. 2- 1 2.1 Type of Facilities

  6. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for United States Air Force Plant Number 59, Johnson City, New York. Appendices

    DTIC Science & Technology

    1988-03-01

    AFP 59 SW-4 Production Field Blank Water Well Water Hart 004 Water Hart 005 f Hart 007 H.3-13 PRINCETON TESTING LABORATORYI 3v~ zANA -YS--S REDO:’- =I...observations. Enforcing the "buddy system" where appropriate. " Determining and posting locations and routes to medical facili- ties, including...poison control centers; arranging for emergency transportation to medical facilities. " Notifying local public emergency officers, i.e., police and fire

  7. AmeriFlux US-IB2 Fermi National Accelerator Laboratory- Batavia (Prairie site)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matamala, Roser

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-IB2 Fermi National Accelerator Laboratory- Batavia (Prairie site). Site Description - Two eddy correlation systems are installed at Fermi National Accelerator Laboratory: one on a restored prairie (established October 2004) and one on a corn/soybean rotation agricultural field (established in July 2005). The prairie site had been farmed for more than 100 years, but was converted to prairie in 1989. April annual to bi-annual prescribed burns have taken place from 1994 - 2007.

  8. Installation Restoration Program. Stage 3. McClellan Air Force Base. Quality Assurance Project Plan

    DTIC Science & Technology

    1990-03-01

    Dibromomethane 5.0 trans- 1,2-Dichloropropene 5.0 1,2-Dibromoethane 4.8 total- 1,4-Dichlorobutene 2.6 Methyl methacrylate 28 1,1, 1,2-Trichloropropane 3.9...trans- 1,2-DCE); • Methyl ethyl ketone (MEK); • Carbon disulfide; • Dichlorobenzene; * Chloroform; and * Methylene chloride. Contaminants reported in soil...2-Hexanone 10 4- Methyl -2-pentanone 10 Tetrachloroethene 4.1 1, 1,2,2-Tetrachloroethane 5.0 Toluene 5.0 Chlorobenzene 5.0 Ethylbenzene 5.0 Styrene 3.0

  9. Installation Restoration Program Records Search for McChord Air Force Base, Washington.

    DTIC Science & Technology

    1982-08-01

    responsible for smoke testing for possi- ble outlets. g ŕ 115 0 V -j q * REFERENCES * .4 g SI * I w I WI j EU REFERENCES Brandin , R. M., and S. Sgt. S. A...Ms. R. Brandin . Griffin, W. C., et al. 1962. Water Resources of the Tacoma Area Washington. Geological Survey Water Supply Paper 1499-B. Prepared in...MEMBERS vS U STEVEN R. HOFFMAN Education B.S., Civil Engineering, South Dakota School of Mines and Technology, 1971 Experience - -. Mr. Hoffman is a

  10. Installation Restoration Program: Rickenbacker Air National Guard Base, Columbus, Ohio. Additional Site Inspection Sampling. Addendum Number 1 to SI/RI/FS/RD Work Plan

    DTIC Science & Technology

    1989-10-01

    Coord: Elev.PROTECTIVE CSG He~qht I Material /Type El e~. ________Diameter Elie.hI____ Depth BGS ___________Weep Hole (YIN) HSe.ht __ GUARD POSTS (YIN...Tremied I Y/14) SCR EE N Type Dimeter - --Slot Size Ck Type SUMP (YIN) Interval OGS Lcngth - 90tt0m Cop (YIN) BACKFILL PLUG Material ...for transport to the laboratory. The remaining liners will then be extruded and the material used for lithologic description and other analyses. The

  11. Installation Restoration Program. Preliminary Assessment for the 162nd Tactical Fighter Group, Arizona Air National Guard, Tucson International Airport, Tucson, Arizona.

    DTIC Science & Technology

    1987-10-01

    about 3 inches thick. The subsoil is light yellowish-brown, fine sandy loam, 25 inches thick, under- lain by a buried subsoil of brown clayey loam, 17...inches thick and brown very gravelly sandy loam to 60 inches or more. Fine lime filaments occur in the . buried subsoil. Permeability of the...18 Paq * 2 of FU. PATHWAYS factor taximum, p Rating Factor Possble Rating Factor (0-3) Multiplier Score Score A. If there is evidence of migration of

  12. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 for Carswell AFB, Texas. Volume 3. Appendices B-L.

    DTIC Science & Technology

    1986-10-01

    investigate the environ- mental feasibility of disposing of flue gas desulfurization (FGD) wastes, ash ’’p and sludge, from a mine mouth power plant by...Department of Defense o EMP - Electromagnetic Profiling o EPA - Environmental Protection Agency o GC - Gas Chromatography o GC-MS - Gas Chromatography-Mass...IN ITEM NO.) ADDITION 01 DELETION CODES: 0 -INTERMEDIATE CIRR: CONTROLLED ITEM RPT ROMT AFSC oRM 705 PREVOIJ EOTO’ , RE U C-4 4rsc-Aad.r IF ,,d 0,P E

  13. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1 for Air Force Plant 6, Cobb County, Georgia. Volume 3.

    DTIC Science & Technology

    1985-08-09

    and regulations. Additional hazard areas refer to non-regulated operations and/or practices that pose potential risks to human and environmental ...ORGANI1A’iON REPORT NUMPERASE IRP-IIa-AFP6 64 xAfi OF PEROING ORG IS ZArTON Śo 7a.AM OF MONITORING OAYIZAToN Environmental Science ’ aeedwabi.) U.S. Air...Force and Engineering, Inc ca ed AORESS Y. State, And ZIP C017) AOSS Approvetaoe pblic reease; P. Box ESE Occupational and Environmental Gainesville, FL

  14. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage I. Tyndall Air Force Base, Florida.

    DTIC Science & Technology

    1984-08-01

    10 31984 . PREPARED FOR UNITED STATES AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL HEALTH LABORATORY BROOKS AIR FORCE BASE, TEXAS 78235 ,,c.’p! ed di...Force August 1984 Occupational and Environmental Health Laboratory I3 NUMBER OF PAGES Aerospace Medical Division (AFSC) 249 total pages• ~~Brooks Air...PROGRAM BACKGROUND i-I 1.2 FACILITY HISTORY 1-3 1.3 DISPOSAL SITE DESCRIPTIONS 1-b 1.4 PROJECT STAFF 1-20 2.0 ENVIRONMENTAL SETTING 2-1 2.1 METEOROLOGY 2-1

  15. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 4, Fort Worth, Texas. Volume 8. Appendices B-E.

    DTIC Science & Technology

    1987-12-01

    d the location documented on a project site map . c. Split all water , sedi:-ent and soil p~ts as -art of the ccntractor’s specific Quality Assurance...regional/site specific hydrcg.volog-y, -]Il And boring logs, data from water level surveys, grcundwater surface and gradient maps , water quality and...COMMAND COMMAND BIOENVIRONMENTAL ENGINEER (AFSC/SGPB) ANDR-WS AIR FORCE BASE, DC 20334-5000 DECEMBER 1987 PREPARED BY RADIAN CORPORATION 8501 MO-PAC

  16. Installation Restoration Program. Preliminary Assessment: Record Search for the 110th Tactical Air Support Group, Michigan Air National Guard, W. K. Kellogg Regional Airport, Battle Creek, Michigan.

    DTIC Science & Technology

    1987-09-01

    these wetlands. Because of the generally low relief at the Base, several manmade drainage ditches have been constructed to improve surface water ...northerly boundary (Hickock, 1985). Within the Marshall Formation, the water table or piezometric surface con- forms somewhat to the land surface. The...34hills" in the water table underlie hills seen on land. The " lows " in the water table coincide with low areas on land (Vanlier, 1966). Thus, the

  17. Engineering and Development Support of General Decon Technology for the U.S. Army’s Installation Restoration Program. Task 2. Treatment of Explosives Contaminated Lagoon Sediment. Phase 1. Literature Review and Evaluation

    DTIC Science & Technology

    1982-04-01

    128 32. Effects of UV, Ozone and UV-Ozone on the Degradation of Pink Water at Zero Flow ............ ................. 130 33. Formation of...Nitrate Ion During UV-Ozonolysis of TNT in Zero Flow Mode ........ ... ........................ ..... 132 34. Detailed Analysis of Run 7-12...the Degradation of Pink Water at Zero Flow* (Layne et al., 1980) *This figure represents a combination of Figures 5 and 7 in the report. 130 - -+ TNT

  18. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 Report for Beale AFB, Marysville, California. Volume 1.

    DTIC Science & Technology

    1987-05-29

    surface soil below the mixing basin at the current Entomology Shop (Building 2560). The concentrations of chlordane found at these two sites is below...surrounding Building No. 440 may have been exposed to pesticide/herbicides from 1965 to 1980 since this site was used to store and mix pesticides used on...ft trench near the three bridges area on Gavin Mandry Road in January 1985. No information is available on what , if anything, was in the drums or when

  19. Superfund record of decision (EPA Region 9): Mather Air Force Base, Landfill Operable Unit, Sacramento County, CA, August 3, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This decision document presents the selected remedial actions for the Landfill OU Sites, at the inactive Mather AFB, Sacramento County, California. The Installation Restoration Program (IRP) sites which comprise the Landfill OU at the inactive Mather AFB include: Site 1 - Runway Overrun Landfill; Site 2 - `8150` Area Landfill; Site 3 - Northeast Perimeter Landfill No. 1; Site 4 - Northeast Perimeter Landfill No. 2; Site 5 - Northeast Perimeter Landfill No. 3; and Site 6 - Firing Range Landfill Sites.

  20. Installation Restoration Program Records Search for Richards-Gebaur Air Force Base, Missouri.

    DTIC Science & Technology

    1983-03-01

    Richards-Gebaur AFB is located on the King anticline, a structural rise favorable for oil and gas production and the oldest gas -producing area in Cass... Oil and Gas Section Chief Don Miller, Ground Water Section Chief 314/364-1752 10. Missouri Department of Natural Resources Kansas City, Missouri Jim...tha uthe United states USMrce sac.. the Ne’lowf Ut of OMVieead this reprt my he rmfau Notsma" I9eb6isuL ?UE service SW~ Partlw Iptbf ll. Yi~taa, T21

  1. Engineering and Development Support of General Decon Technology for the DARCOM Installation Restoration Program. Task 1. Lagoon/Landfill Liner Compatibility Testing with Explosives.

    DTIC Science & Technology

    1983-06-01

    NOTES 19. KEY WORDS (Continue on reveree side if necesaary and Identify by block number) Neoprene Synthetic Liners TCE, XR-5, EPDM Hypalon Compatibility...CPE, Hypalon , XR-5, HDPE, Neoprene, and EPDM ) were immersed in TNT, RDX, and TCE solutions for I week. Liner and test .*. method selection and data...Mean Weight Change Values - EPDM /Neoprene Group 57 Unexposed and in Distilled Water 7 Mean Weight Change Values - PVC Group in Distilled 58 Water and in

  2. Umatilla River Subbasin Fish Habitat Improvement Program, 1996-2003 Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St. Hilaire, Danny R.; Montgomery, Michael; Bailey, Timothy D.

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The last Annual Program Report was submitted in 1997, and described projects undertaken in 1995. This report describes Program activities carried out in 2003, along with a summary of projects undertaken during the years 1996 through 2002. The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestockmore » exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary table of past projects (1996-2002), along with a text description of more extensive habitat improvement projects, including: (1) Implementation of a four-phased project on the Lobato property (Birch Creek) beginning in 1996 and involving a demonstration bioengineering site and riparian improvements (fencing, planting), (2) Implementation of stable channel design/instream structure placement on the Houser property, East Birch Creek, beginning in 1998, an (3) Implementation of a joint, US Army Corps of Engineers/ODFW (cost share) project beginning in 2001 on the Brogoitti property, East Birch Creek, which involved implementation of stable channel design/construction and riparian improvement treatments.« less

  3. Bi-layered zirconia/fluor-apatite bridges supported by ceramic dental implants: a prospective case series after thirty months of observation.

    PubMed

    Spies, Benedikt Christopher; Witkowski, Siegbert; Butz, Frank; Vach, Kirstin; Kohal, Ralf-Joachim

    2016-10-01

    The aim of this study was to determine the success and survival rate of all-ceramic bi-layered implant-supported three-unit fixed dental prostheses (IS-FDPs) 3 years after implant placement. Thirteen patients (seven males, six females; age: 41-78 years) received two one-piece ceramic implants (alumina-toughened zirconia) each in the region of the premolars or the first molar and were finally restored with adhesively cemented bi-layered zirconia-based IS-FDPs (3 in the maxilla, 10 in the mandible) composed of CAD/CAM-fabricated zirconia frameworks pressed-over with fluor-apatite glass-ceramic ingots. At prosthetic delivery and the follow-ups after 1, 2 and 3 years, the restorations were evaluated using modified United States Public Health Service (USPHS) criteria. Restorations with minor veneer chippings, a small-area occlusal roughness, slightly soundable restoration margins, minimal contour deficiencies and tolerable color deviations were regarded as success. In case of more distinct defects that could, however, be repaired to a clinically acceptable level, IS-FDPs were regarded as surviving. Kaplan-Meier plots were used for the success/survival analyses. To verify an impact on subjective patients' perceptions, satisfaction was evaluated by visual analog scales (VAS). All patients were seen 3 years after implant installation. No IS-FDP had to be replaced, resulting in 100% survival after a mean observation period of 29.5 months (median: 30.7). At the 3-year follow-up, 7/13 IS-FDPs showed a veneer chipping, 13/13 an occlusal roughness and 12/13 minimal deficiencies of contour/color. Since six restorations showed a major chipping and/or a major occlusal roughness, the Kaplan-Meier success rate was 53.8%. However, patients' significantly improved perceptions of function, esthetics, sense, and speech at prosthetic delivery remained stable over time. Bi-layered zirconia/fluor-apatite IS-FDPs entirely survived the observation period but showed a high frequency of technical complications. Nevertheless, the treatment highly satisfied patients' expectations. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  4. Installation Restoration Program. Stage 3. Remedial Investigation/ Feasibility Study. Elmendorf Air Force Base, Alaska. Volume 5. Appendix G

    DTIC Science & Technology

    1990-05-01

    Pentachloronitrobenzene ND mg/kg 2.5 S P henaceti n NO mg/kg 2- Picoline ND mg/kgI Pronamideh NO mg/kg 2.5I benzene ND mg/kg 2.5 2, 6-Di chi orophenol ND mg/kg 2.5 I...mg/kg 2.5 Pentachloronitrobenzene NO mg/kg 2.5 Phenaceti n ND mg/kg 2.5 2- Picoline ND mg/kg 2.5 Pronamide ND mg/kg 2.5 1 ,2,4,5-Tetrachloro benzene ND...Phenacetin ND mg/kg 2.5 2- Picoline ND mg/kg 2.5 Pronami de ND mg/kg 2.5 1,2,4,5-Tetrachlorobenzene ND mg/kg 2.5 2, 6-Di chi orophenol ND mg/kg 2.5 2-Methyl

  5. Flow characteristics and salinity patterns of tidal rivers within the northern Ten Thousand Islands, southwest Florida, water years 2007–14

    USGS Publications Warehouse

    Booth, Amanda C.; Soderqvist, Lars E.

    2016-12-12

    Freshwater flow to the Ten Thousand Islands estuary has been altered by the construction of the Tamiami Trail and the Southern Golden Gate Estates. The Picayune Strand Restoration Project, which is associated with the Comprehensive Everglades Restoration Plan, has been implemented to improve freshwater delivery to the Ten Thousand Islands estuary by removing hundreds of miles of roads, emplacing hundreds of canal plugs, removing exotic vegetation, and constructing three pump stations. Quantifying the tributary flows and salinity patterns prior to, during, and after the restoration is essential to assessing the effectiveness of upstream restoration efforts.Tributary flow and salinity patterns during preliminary restoration efforts and prior to the installation of pump stations were analyzed to provide baseline data and preliminary analysis of changes due to restoration efforts. The study assessed streamflow and salinity data for water years1 2007–2014 for the Faka Union River (canal flow included), East River, Little Wood River, Pumpkin River, and Blackwater River. Salinity data from the Palm River and Faka Union Boundary water-quality stations were also assessed.Faka Union River was the dominant contributor of freshwater during water years 2007–14 to the Ten Thousand Islands estuary, followed by Little Wood and East Rivers. Pumpkin River and Blackwater River were the least substantial contributors of freshwater flow. The lowest annual flow volumes, the highest annual mean salinities, and the highest percentage of salinity values greater than 35 parts per thousand (ppt) occurred in water year 2011 at all sites with available data, corresponding with the lowest annual rainfall during the study. The highest annual flow volumes and the lowest percentage of salinities greater than 35 ppt occurred in water year 2013 for all sites with available data, corresponding with the highest rainfall during the study.In water year 2014, the percentage of monitored annual flow contributed by East River increased and the percentage of flow contributed by Faka Union River decreased, compared to the earlier years. No changes in annual flow occurred at any sites west of Faka Union River. No changes in the relative flow contributions were observed during the wet season; however, the relative amounts of streamflow increased during the dry season at East River in 2014. East River had only 1 month of negative flow in 2014 compared to 6 months in 2011 and 7 months in 2008. Higher dry season flows in East River may be in response to restoration efforts. The sites to the west of Faka Union River had higher salinities on average than Faka Union River and East River. Faka Union River had the highest range in salinities, and Faka Union Boundary had the lowest range in salinities. Pumpkin River was the tributary with the lowest range in salinities.1Water year is defined as the 12-month period from October 1, for any given year, through September 30 of the following year.

  6. Electrical resistivity investigation of fluvial geomorphology to evaluate potential seepage conduits to agricultural lands along the San Joaquin River, Merced County, California, 2012–13

    USGS Publications Warehouse

    Groover, Krishangi D.; Burgess, Matthew K.; Howle, James F.; Phillips, Steven P.

    2017-02-08

    Increased flows in the San Joaquin River, part of the San Joaquin River Restoration Program, are designed to help restore fish populations. However, increased seepage losses could result from these higher restoration flows, which could exacerbate existing drainage problems in neighboring agricultural lands and potentially damage crops. Channel deposits of abandoned river meanders that are hydraulically connected to the river could act as seepage conduits, allowing rapid and widespread water-table rise during restoration flows. There is a need to identify the geometry and properties of these channel deposits to assess their role in potential increased seepage effects and to evaluate management alternatives for reducing seepage. Electrical and electromagnetic surface geophysical methods have provided a reliable proxy for lithology in studies of fluvial and hyporheic systems where a sufficient electrical contrast exists between deposits of differing grain size. In this study, direct-current (DC) resistivity was used to measure subsurface resistivity to identify channel deposits and to map their subsurface geometry. The efficacy of this method was assessed by using DC resistivity surveys collected along a reach of the San Joaquin River in Merced County, California, during the summers of 2012 and 2013, in conjunction with borings and associated measurements from a hydraulic profiling tool. Modeled DC resistivity data corresponded with data from cores, hand-auger samples, a hydraulic profiling tool, and aerial photographs, confirming that DC resistivity is effective for differentiating between silt and sand deposits in this setting. Modeled DC resistivity data provided detailed two-dimensional cross-sectional resistivity profiles to a depth of about 20 meters. The distribution of high-resistivity units in these profiles was used as a proxy for identifying areas of high hydraulic conductivity. These data were used subsequently to guide the location and depth of wells installed onsite for monitoring flow in the channel deposits. Estimates of the cross-sectional area of channel deposits from DC resistivity pseudosections can provide critical input for groundwater-flow models designed to simulate river seepage and evaluate seepage-management alternatives.

  7. The role of beaver in shaping steelhead trout (Oncorhynchus mykiss) habitat complexity and thermal refugia in a central Oregon stream

    NASA Astrophysics Data System (ADS)

    Consolati, F.; Wheaton, J. M.; Neilson, B. T.; Bouwes, N.; Pollock, M. M.

    2012-12-01

    The incised and degraded habitat of Bridge Creek, tributary to the John Day River in central Oregon, is thought to be limiting the local population of ESA-listed steelhead trout (Oncorhynchus mykiss). Restoration efforts for this watershed are aimed to improve their habitat through reconnecting the channel with portions of its former floodplain (now terraces) to increase stream habitat complexity and the extent of riparian vegetation. This is being done via the installation of over a hundred beaver dam support (BDS) structures that are designed to either mimic beaver dams or support existing beaver dams. The overall objective of this study is to determine if the BDS structures have had an effect on stream channel habitat complexity and thermal refugia in selected sections of Bridge Creek. Analysis of stream temperature data in restoration treatment and control areas will show the effects of beaver dams on stream temperature. Analysis of aerial imagery and high resolution topographic data will exhibit how the number and types of geomorphic units have changed after the construction of beaver dams. Combined, the results of this research are aimed to increase our understanding of how beaver dams impact fish habitat and stream temperature.

  8. Developing a programmatic approach to investigating and remediating many unrelated comprehensive environmental response, compensation, and liability act sites at Kelly Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kamp, G.; Regan, P.; Ninesteel, R.

    1988-01-01

    Kelly Air Force Base (AFB), which was founded in 1917, is involved in logistics and maintenance activities supporting the Air Logistics Command. In addition, Kelly AFB hosts over 50 tenant organizations representing the Air Force, Department of Defense, and other government agencies. Over the years waste disposal from this complex was conducted in a manner that led to the identification of over 30 sites to be included in the Installation Restoration Program (IRP) after the Phase 1 investigation. A methodology was needed to prioritize the Remedial Investigations and Feasibility Study (RI/FS) activities for the sites. A Strategy Plan was developedmore » that involved reviewing and interpreting existing data, identifying data voids relative to site specific RI/FS activities, and developing methodology to prioritize activities. Sites were prioritized, and a comprehensive IRP planning document was developed. One data deficiency was revealed -- the lack of understanding of the Basewide hydrogeologic conditions necessary to establish an effective restoration program. A Hydrogeologic Investigation was initiated to provide this data. This data will allow better interpretation of the interaction of the sites, particularly those in close proximity, and improved planning of remediation activities.« less

  9. Sustainable Strategies for the Dynamic Equilibrium of the Urban Stream, Cheonggyecheon

    NASA Astrophysics Data System (ADS)

    Seo, D.; Kwon, Y.

    2018-04-01

    Cheonggyecheon, which had been transformed into a 14-lane urban highway and a large underground sewer system, was finally converted back to an urban stream again. Its transformation has been praised as a successful example of urban downtown regeneration and beautification. It is, however, obvious that there have not been prudent ecological considerations since the project’s principal goals were to provide public recreational use and achieve maximum flood control capacity via the use of embankments. For a healthier and sustainable stream environment, Cheonggyecheon should be ecologically re-restored again, based on a dynamic equilibrium model. It must primarily establish a corridor of vegetation, an aquatic transitional zone, and install constructed wetlands nearby which support the water source. The upper streams of Cheonggyecheon should be further restored and supply natural waters. Furthermore, there ultimately needs to be de-channelization for hydrological sustainability. This would vary from merely increasing the sinuosity to thoroughly reconstruct a naturalized stream. Complete dynamic equilibrium of Cheonggyecheon can be accomplished through more fundamental sustainable strategies.

  10. The potential for short rotation energy forestry on restored landfill caps.

    PubMed

    Nixon, D J; Stephens, W; Tyrrel, S F; Brierley, E D

    2001-05-01

    This review examines the potential for producing biomass on restored landfills using willow and poplar species in short rotation energy forestry. In southern England, the potential production may be about 20 t ha(-1) of dry stem wood annually. However, actual yields are likely to be constrained by detrimental soil conditions, including shallow depth, compaction, low water holding capacity and poor nutritional status. These factors will affect plant growth by causing drought, waterlogging, poor soil aeration and nutritional deficiencies. Practical solutions to these problems include the correct placement and handling of the agricultural cap material, soil amelioration using tillage and the addition of organic matter (such as sewage sludge), irrigation (possibly using landfill leachate), the installation of drainage and the application of inorganic fertilizers. The correct choice of species and clone, along with good site management are also essential if economically viable yields are to be obtained. Further investigations are required to determine the actual yields that can be obtained on landfill sites using a range of management inputs.

  11. Impact of a wastewater treatment plant on microbial community composition and function in a hyporheic zone of a eutrophic river

    NASA Astrophysics Data System (ADS)

    Atashgahi, Siavash; Aydin, Rozelin; Dimitrov, Mauricio R.; Sipkema, Detmer; Hamonts, Kelly; Lahti, Leo; Maphosa, Farai; Kruse, Thomas; Saccenti, Edoardo; Springael, Dirk; Dejonghe, Winnie; Smidt, Hauke

    2015-11-01

    The impact of the installation of a technologically advanced wastewater treatment plant (WWTP) on the benthic microbial community of a vinyl chloride (VC) impacted eutrophic river was examined two years before, and three and four years after installation of the WWTP. Reduced dissolved organic carbon and increased dissolved oxygen concentrations in surface water and reduced total organic carbon and total nitrogen content in the sediment were recorded in the post-WWTP samples. Pyrosequencing of bacterial 16S rRNA gene fragments in sediment cores showed reduced relative abundance of heterotrophs and fermenters such as Chloroflexi and Firmicutes in more oxic and nutrient poor post-WWTP sediments. Similarly, quantitative PCR analysis showed 1-3 orders of magnitude reduction in phylogenetic and functional genes of sulphate reducers, denitrifiers, ammonium oxidizers, methanogens and VC-respiring Dehalococcoides mccartyi. In contrast, members of Proteobacteria adapted to nutrient-poor conditions were enriched in post-WWTP samples. This transition in the trophic state of the hyporheic sediments reduced but did not abolish the VC respiration potential in the post-WWTP sediments as an important hyporheic sediment function. Our results highlight effective nutrient load reduction and parallel microbial ecological state restoration of a human-stressed urban river as a result of installation of a WWTP.

  12. Hurricane shuts down gulf activity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Koen, A.D.

    1992-08-31

    This paper reports that producers in the Gulf of Mexico and plant operators in South Louisiana last week were checking for damage wrought by Hurricane Andrew. In its wake Andrew left evacuated rigs and platforms in the gulf and shuttered plants across a wide swath of the Gulf Coast. Operations were beginning to return to normal late last week. Not all gulf operators, especially in the central gulf, expected to return to offshore facilities. And even producers able to book helicopters did not expect to be able to fully assess damage to all offshore installations before the weekend. MMS officialsmore » in Washington estimated that 37,500 offshore workers were evacuated from 700 oil and gas installations on the gulf's Outer Continental Shelf. Gulf oil and gas wells account for about 800,000 b/d of oil and one fourth of total U.S. gas production. MMS was awaiting an assessment of hurricane damage before estimating how soon and how much gulf oil and gas production would be restored.« less

  13. Installation Restoration Program. Phase II. Confirmation/Quantification Stage 2 for Griffiss Air Force Base, New York.

    DTIC Science & Technology

    1985-02-20

    Surface Cemennt/entonte Grout Rat 20/1 6" Diameter Bore "Ole 8 Foit B.G.S. Bentorito 4" Diameter POes" Schedle 409 Fee S.O.S.PVC Riser Pipe with...Casing with Locking Cap GRiser Pipe StickupGround Surface 2.2Fe Cement/BSentonite Grout Ratio 20/1 8" Diameter Bore Hole cv Ile- 3 Feet B.G.S...Ground Surface 4’. Ground Surface .0~ Cemtert/Bentonlte Grout Rat 20/1 8" Diamneter Bore Hole__ 4" Diameter Pl O Schedule 404 PVC Riser Pipe FetBGS

  14. Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1992.

    DTIC Science & Technology

    1993-04-02

    5. Eielson AFB , AK 24,336 159,535 6. Ellsworth AFB , SD 8,521 63,000 7. Elmendorf AFB , AK 23,227 107,263 8. Fairchild AFB (4 Waste Areas), WA 13,738...HRS Score (Latest) FY 92 FY 92 Status Year AIR FORCE (Continued) 7. Eielson AFB AK 48.14 92 7,055 14,799 FIN 91 8. Ellsworth AFB SD 33.62 91 690 7,831...decided at their October 7, 1992 cleanup decisions at Air Force meeting to recommend the use of . Andersen AFB , Guam installations. As part of the first

  15. Installation Restoration Program Phase 1. Records Search. Air Force Plant Number 36, Ohio

    DTIC Science & Technology

    1985-07-01

    n >:: FVJl «■^h’-. Kn>»p»y!< fc » wi are exposed on the ground surface. On either side of this valley con- solidated rocks of shale and limestone are...Electric Well No. 3A ( 183 feet deep) completed also in 1951 displayed a water mmmmmmmmi m w\\!wü wUWinntnW VW^^^ft ÄW^F^^’Sr...FIGURE 3.8 3-18 ENGINEERING-SCIENCE IM^N^^C^ xmmmmtttK*KWimmx& ■sm^m^ fc ^^^ level of 56 feet. "Hie differences in water levels indicate the

  16. Installation Restoration Program. Remedial Investigation Report. Minnesota Air National Guard Base Duluth International Airport, Duluth, Minnesota. Volume 4

    DTIC Science & Technology

    1990-01-01

    DATA job No.: OROOl Calibration Date: 8-19-88 Instrument I.D.: Perkin Elmer 257 Client: ES Oak Ridge Grating Infrared Spectrophotometer Attn: Bill...ilh (2 2 ___ UPPER I LIMIT__ I/ LOWER I0 I 9 I LIMIT_ I -00 I o0 WW2 1EPA SAMPLE] I No. I I I---. ...I I .. .. - ==== =---I 01- J ox.9oJ wqIJ~%o S... Infrared Spectrophotometer Attn: Bill Hayden Address: 710 S. Illinois Avenue Unit: mg/L Suite F-103 Date Reported: 11-09-88 Oak Ridge, Tn. 37830 R

  17. Installation Restoration Program. Phase 1. Records Search, McGuire AFB, New Jersey

    DTIC Science & Technology

    1982-11-01

    Raritan- Magothy System * 3.12 Log of Base Well OD" 3-23 3.13 Well no. 1 at McGuire Missile Site 3-25 3.14 Base Well Locations 3-26 3.15 Surface Water...in the Potomac-Raritan- Magothy outcrop area has been published. This is not expected to impact base water quality in the near term. o Flooding is not a...Potamac-Raritan- Magothy System (PRM) 3-13 FIGURE 3.7 McGUIRE AFB STANDARD LOG OF McGUIRE PENETRATION. TEST MISSILE SITE I TEST BORING 46 21 DEPTH BELOW

  18. Installation Restoration Program. Phase 1. Record Search for the 106th Aerospace Rescue and Recovery Group, New York Air National Guard, Suffolk County Air National Guard Base, Westhampton Beach, New York.

    DTIC Science & Technology

    1987-07-01

    Raritan Formation and the Magothy Formation. The Raritan Formation, which rests on the bedrock, is subdivided into the Lloyd Sand Member and the clay...member, which is the uppermost part. The Raritan Formation is below sea level. The Magothy Formation outcrops at only a few locations on Long Island...the Magothy , and the Lloyd Sand member of the Raritan Formation. These aquifers are made up of sand and gravel and small amounts of silt and clay

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matamala, Roser

    This is the AmeriFlux version of the carbon flux data for the site US-IB1 Fermi National Accelerator Laboratory- Batavia (Agricultural site). Site Description - Two eddy correlation systems are installed at Fermi National Accelerator Laboratory: one on a restored prairie (established October 2004) and one on a corn/soybean rotation agricultural field (established in July 2005). The prairie site had been farmed for more than 100 years, but was converted to prairie in 1989. The agricultural site has likely been farmed for more than 100 years, but the first documented instance of agricultural activity dates back to a picture taken inmore » 1952.« less

  20. Installation Restoration Program (Sites 1, 2, 3, 4, 5, 8, 13). Phase 4. Remedial Action Plan and Conceptual Documents, Edwards AFB, California

    DTIC Science & Technology

    1984-11-01

    R &D investigations. 1.3 PHASE IV SITE DESCRIPTIONS I Three primary sites are included in this Phase IV...34C z I L . ...- I I E I I i -\\ = _ _ _ . .. .....,. . .. .. I x FIGURE 1.7 a qq"-.. .. .. .. .. .. "- _ r JI I g I I1 ,n I , I I I " I - I Br-.,,-%~l...0 0 4J 4) 44 4) V ) -H 0 4 6: 144 d 0 4 14 404)-4 -4 4 .4 N ) 4 0 4) 𔃾 4 40 4) 4) 0.0

  1. Installation Restoration General Environmental Technology Development. Task II. Pilot Investigation of Low Temperature Thermal Stripping of Volatile Organic Compounds (VOC’s) from Soil. Volume 2. Appendices

    DTIC Science & Technology

    1986-06-01

    15 celitimeterh Ca p,.ragraph. ifllCll (.q f oifice n nabe US (2) At the end of eachl operating da:Y. or at least once eve’ry 24-huur perlod while...fn Droc64 os ~S"m 0oftfe SOW .0 C10" onn odcoo.f o fOE ar6t1.foW Ireeffflso wn from* tൈ 14 11100 cowf o.,cess A0 orion’.. C~odaCf T 9031 Sy -onoducf

  2. U.S. Air Force Installation Restoration Program. Phase 1. Records Search. Air National Guard, Camp Edwards (ARNG), U.S. Air Force and Veteran’s Administration Facilities at Massachusetts Military Reservation, Massachusetts. Task 6

    DTIC Science & Technology

    1986-12-11

    MMR main gate (see Figure 3.2-1). In those ponds Umbrella-grass (Guirena-pumila) and Hyssop Hedge- nettle (Stachys- hyssopifolia) were found. The other...has conducted research in Buildings 286 and 240. From 1963 to 1969, the lab tested insecticides for private companies. Residuals from the 4...Airport Turf Insecticidal Treatments for Japanese Beetle and European Chafer, Eastern Region. Stahl, Ralph G., Joachim G. Liehr, and Ernst M. Davis. 1984

  3. Installation Restoration Program. Phase II. Confirmation/Quantification Stage I for Wright-Patterson Air Force Base, Dayton, Ohio.

    DTIC Science & Technology

    1985-09-01

    combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane , and 10.3 Adjust the purge gas (nitrogen 8.3.2 The laboratory must develop...Smmmmmmmiih EmmmmmmEEmmmiEEhhE/hEEE/hEEI EEEmmmmmmmlmmE mmmEmmEEmmmmEI mmmmEEmmmEEmmI . AN 11 Igo 12. i,11111 1111 IIII1111l 1.2 IlII1.4 11’ .6 1 ...BASE DAYTON, OHIO AIR FORCE SYSTEMS COMMAND HEADQUARTERS AERONAUTICAL SYSTEMS DIVISION WRIGHT-PATTERSON AFB, OHIO 1 AUGU.$ 985 PREPARED BY ROY F

  4. Installation Restoration Program. Remedial Investigation Report: Minnesota Air National Guard Base Duluth International Airport, Duluth, Minnesota. Volume 7

    DTIC Science & Technology

    1990-01-01

    Selection of Indicator Chemicals 6-36 6.2.2 Estimation of Exposure Point Concentrations or Emission Rates 6-38 6.2.2.1 Exposure Pathway Analysis 6-38...Exposure Point Concentrations or Emission Rates 6-50 j 6.3.2.1 Exposure Pathway Analysis 6-52 6.3.2.2 Exposure Point Concentrations 6-55 6.3.2.3...Exposure Point Concentrations or Emission Rates 6-62 6.4.2.1 Exposure Pathway Analysis 6-62 6.4.2.2 Exposure Point Concentrations 6-69 6.4.2.3

  5. Installation Restoration Program. Preliminary Assessment: 180th Tactical Fighter Group, Ohio Air National Guard, Toledo Express Airport, Swanton, Ohio and 200th Red Horse Civil Engineering Squadron, Ohio Air National Guard, Camp Perry ANG Station, Port Clinton, Ohio

    DTIC Science & Technology

    1989-11-01

    at a Superfund site in Puerto Rico to ascertain the alleged extent of mercury contamination. C.C. Johnson & Malhotra. P.C. (1985-1988): Environmental...industrial hygiene and training, as well as other environmental matters. 3 DETOX , Inc. (1986): Manager, Technical Services Responsible for the...computer and CAD operations, and company R&D efforts. DETOX , Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United

  6. Hill AFB, Utah Installation Restoration Program. Phase IIB, IRP Survey. Volume 1. Text. Volume 2. Appendices

    DTIC Science & Technology

    1984-09-11

    5 EPA 625 . Endosulfan sulfate wg/L 5 EPA 625 Chlordane pg/L * Toxaphene Pg/L * Acid Extractable Detection Analytical Compound Units Limit Method...ND ND ND ND 4,4’-DDT 5 ND ND ND ND Endosuif an sulfate 5 ND ND ND ND Chlordane* Toxa phene* Detection Acid Extractable Compound Limit M4-2 M4-6 14-9 Ge...Endosulfan sulfate 5 ND ND Chlordane * Toxaphene * Detection Acid Extractable Compound Limit BPM-1 BPM-2 2-Chlorophenol 2 ND ND 2-Nitrophenol 2 ND ND

  7. Installation Restoration Program Information Management System (IRPIMS) Data Loading Handbook. Version 2.1

    DTIC Science & Technology

    1989-09-01

    STEEL STL STEEL TFL TEFLON TIL TILE WD WOOD WRI WROUGHT IRON Z OTHER A-14 coam Bc~ai=L a TEST PIT ois rn iEI AR AIR - ROTARY 8 BORED OR AUGERED C CABLE-TOOL...CO CORING Cs CHILLED SHOT D DUG DH DOWN THE HOLE HAMMER HA HAND AUGERED HS HOLLOW STEM AUGER J JETTED MR DIRECT CIRCULATION ROTARY , MUD p AIR ...INSTITUTE WARI WATER AND AIR RESEARCH. INC. WIL WILSON AND CO. A-18 M 0E 7 PIT E V/n.. CK: N’Y ESCI ENGINEERING -SCIENCE NA NOT APPLICABLE RB MR

  8. Installation Restoration Program. Preliminary Assessment: Records Search for the 119th Fighter Interceptor Group, North Dakota Air National Guard, Hector Field , Fargo, North Dakota.

    DTIC Science & Technology

    1987-10-01

    3𔃿 I, UNLSSflD r/ H : . ,_ .m 0 1 -8 111 . ! m m’" , L . I-~*211111220 MICROCOP RESOLUTICN TEST CHART NATIONAL BUREAU 0I SANDARD ’l l 4 AtJLLW i V...include, but not be limited to, any element, substance, compound , or mixture, including disease- causing agents, which after release into the environment...under: (a) any substance designated pursuant to Section 311(b)(2)(A) of the Fed-- eral Water Pollution Control Act, (b) any element, compound , mixture

  9. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1. Homestead Air Force Base, Florida.

    DTIC Science & Technology

    1986-03-07

    8217 CLS7 PA SPOONER ET AL, 87 MAR Big F/G 12 11111g 1.0 03,2 i 1111111L_ MICROCOP RE ION TEST NATtnNAL HURLAIl )IF SIANDAPFrl £, , , 11 11I% AD-A 171 579...North Gate - ’FPT-?\\ Sal) West Gate ,o > e-.? ! •• ai Bouganville \\>°( ,, FigreES-. ocaio of SiesI etgae CE Storagje Compound SP1 SP-7 - FPTA-3...determine the areal sample and analyze for extent of groundwater target compounds identified contamination. in 1-9 (or for volatile organics using EPA

  10. Installation Restoration Program. Phase 2 - Confirmation/ Quantification. Stage 2 for McChord Air Force Base, Washington

    DTIC Science & Technology

    1986-04-30

    Si 35 Areas E and J Waste Disposal Sites and IRP Phase II Monitoring Well Locations ^ 36 Areas F and H Waste Disposal Sites and IRP Phase II...4 oMe c hy 1 - 2 - Pen eeaocie lephchelene 1.2- Trene Dlchloroechyle 1,1,1-Trlchloroechene Toluene Tinyl Acftcete H.P-Xylene 0-Xylene ACIDS AW) OTMEKS...4) a. > n k. Q 41 ^ 0 oca Li »I 4) M 41 X C (B w < G a. v 1 m M ! Si 118 swe Table 16 TOTAL AND SOLUBLE HEAVY

  11. Installation Restoration Program. Ohio Air National Guard, Toledo Express Airport, Swanton, Ohio. Site Investigation Work Plan

    DTIC Science & Technology

    1990-09-01

    Initially, cuttings from the borings and wells will be placed on plastic sheeting, covered, and left at the drilling site until a determination can be...Spwmxds Solids (K160.2) X X X X X Nitrate - Nitrate (PE3M.1) X X X X X tPhysical Caracteristics : Soil Enginering Classificatim X X X X X X X X (MQ8-84...site, soil cuttings from drilling the borings and wells will be placed on a plastic tarp and covered until samples of the soil have been screened using

  12. Installation Restoration Program for Eglin AFB, Florida. Phase 2. Field Evaluation

    DTIC Science & Technology

    1984-09-01

    of t jest l-iianja-erent pra-ct ices w .hien are discussed in Section D.5 5.1.4 Landfill L)-26 In Dotn NoveM( Der and tebruary samplI igs, ioX" results...to analy.ze 6rounawater samp los tronm La’nd ti I v)-ZIt for organional I ides in the base/ neut ral extractaLeI, organics section of the priority...the gasoline tank was not filled near wells or the van and any spillage was allowed to evaporate before moving the pump. During use, the pump was

  13. Installation Restoration Program. Preliminary Assessment: 185th Tactical Fighter Group, Iowa Air National Guard, Sioux Gateway Airport, Sergeant Bluff, Iowa and 133rd Tactical Control Flight, Iowa Air National Guard, Fort Dodge Municipal Airport, Fort Dodge, Iowa

    DTIC Science & Technology

    1988-12-01

    nuclear disintegration of certain elements and isotopes, with the emission of radiation, radiant energy capable of affecting living tissue. RADIUM - A...Corrosion Control. Waste oils, recovered fuels , spent cleaners, strippers, and solvents are * generated by these shops. ES-i mIs- Interviews with past...HAS-73) A defueling pit is located north of the old alert hangar (Building No. 241). Excess JP-4 fuel in the F-100 aircraft was dumped into the pit

  14. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). Themore » restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.« less

  15. Assessing the Impacts of Land-Use Change and Ecological Restoration on CH4 and CO2 Fluxes in the Sacramento-San Joaquin Delta, California: Findings from a Regional Network of Eddy Covariance Towers

    NASA Astrophysics Data System (ADS)

    Knox, S. H.; Sturtevant, C. S.; Oikawa, P. Y.; Matthes, J. H.; Koteen, L. E.; Anderson, F. E.; Verfaillie, J. G.; Baldocchi, D. D.

    2014-12-01

    The new generation of open-path, low power, laser spectrometers has allowed us to measure methane (CH4) fluxes continuously in remote regions and answer new and exciting questions on the spatial and temporal variability of greenhouse gas (GHG) fluxes using networks of eddy covariance (EC) towers. Our research is focused in the Sacramento-San Joaquin Delta where we have installed a regional network of flux towers to assess the impacts of land-use change and ecological restoration on CH4 and CO2 fluxes. The Delta was drained for agriculture over a century ago and has since has experienced high rates of subsidence. It is recognized that agriculture on drained peat soils in the Delta is unsustainable in the long-term, and to help reverse subsidence and capture carbon (C) there is an interest in restoring drained land-use types to flooded conditions. However, flooding increases CH4 emissions. We conducted multiple years of simultaneous EC measurements at drained agricultural peatlands (a pasture, a corn field and an alfalfa field) and flooded land-use types (a rice paddy and 3 restored wetlands) to assess the impact of drained to flooded land-use change on CO2 and CH4 fluxes. Since these sites are all within 20 km of each other, they share the same basic meteorology, enabling a direct comparison of differences in the C and GHG budgets between sites. Using a multi-tower approach we found that converting drained agricultural peatlands to flooded land-use types can help reverse soil subsidence and reduce GHG emissions from the Delta. Furthermore, there is a growing interest in wetland restoration in California to generate C credits for both the voluntary C market and the state's cap-and-trade program. However, information on GHG fluxes from restored wetlands is lacking. Using multi-year measurements of GHG fluxes from restored wetlands of varying ages, our research also aims to understand how CO2 and CH4 fluxes from restored wetlands vary during ecosystem development, determine the daily and seasonal forcings controlling these fluxes, and assess management strategies that can help minimize CH4 fluxes and maximize C uptake in restored wetlands. Our multi-year multi-site research program is beginning to answer these questions and bridge understanding between biometeorology, biogeochemistry and climate policy.

  16. Development of an Assessment Tool for Agricultural Best Management Practice Iimplementation in the Great Lakes Restoration Initiative Priority Watersheds—Alger Creek, Tributary to Saginaw River, Michigan

    USGS Publications Warehouse

    Merriman, Katherine R.

    2015-11-19

    The Great Lakes face a number of serious challenges that cause damage to water quality, habitat, ecology, and coastal health. Excess nutrients from point and nonpoint sources have a history of causing harmful algal blooms (HABs); since the late 1990s, a resurgence of HABs have forced beach closures and resulted in water quality impairments across the Great Lakes. Studies increasingly point to phosphorus (P) runoff from agricultural lands as the cause of these HABs. In 2010, the Great Lakes Restoration Initiative (GLRI) was launched to revitalize the Great Lakes. The GLRI aims to address the challenges facing the Great Lakes and provide a framework for restoration and protection. As part of this effort, the Priority Watersheds Work Group (PWWG), cochaired by the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Agriculture-Natural Resources Conservation Service (USDA–NRCS), is targeting Priority Watersheds (PWs) to reduce the amount of P reaching the Great Lakes. Within the PWs, USDA–NRCS identifies small-scale subbasins with high concentrations of agriculture for coordinated nutrient reduction efforts and enhanced monitoring and modeling. The USDA–NRCS supplies financial and/or technical assistance to producers to install or implement best management practices (BMPs) to lessen the negative effects of agriculture to water quality; additional funding is provided by the GLRI through USDA–NRCS to saturate the small-scale subbasins with BMPs. The watershed modeling component, introduced in this fact sheet, assesses the effectiveness of USDA–NRCS funded BMPs, and nutrient reductions because of GLRI or other funding programs are differentiated. Modeling scenarios consider BMPs that have already been applied and those planned to be implemented across the small-scale subbasins.

  17. Development of an Assessment Tool for Agricultural Best Management Practice Implementation in the Great Lakes Restoration Initiative Priority Watersheds—Eagle Creek, Tributary to Maumee River, Ohio

    USGS Publications Warehouse

    Merriman, Katherine R.

    2015-11-19

    The Great Lakes face a number of serious challenges that cause damage to water quality, habitat, ecology, and coastal health. Excess nutrients from point and nonpoint sources have a history of causing harmful algal blooms (HABs); since the late 1990s, a resurgence of HABs have forced beach closures and resulted in water quality impairments across the Great Lakes. Studies increasingly point to phosphorus (P) runoff from agricultural lands as the cause of these HABs. In 2010, the Great Lakes Restoration Initiative (GLRI) was launched to revitalize the Great Lakes. The GLRI aims to address the challenges facing the Great Lakes and provide a framework for restoration and protection. As part of this effort, the Priority Watersheds Work Group (PWWG), cochaired by the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Agriculture-Natural Resources Conservation Service (USDA–NRCS), is targeting Priority Watersheds (PWs) to reduce the amount of P reaching the Great Lakes. Within the PWs, USDA–NRCS identifies small-scale subbasins with high concentrations of agriculture for coordinated nutrient reduction efforts and enhanced monitoring and modeling. The USDA–NRCS supplies financial and/or technical assistance to producers to install or implement best management practices (BMPs) to lessen the negative effects of agriculture to water quality; additional funding is provided by the GLRI through USDA–NRCS to saturate the small-scale subbasins with BMPs. The watershed modeling component, introduced in this fact sheet, assesses the effectiveness of USDA–NRCS funded BMPs, and nutrient reductions because of GLRI or other funding programs are differentiated. Modeling scenarios consider BMPs that have already been applied and those planned to be implemented across the small-scale subbasins.

  18. Development of an Assessment Tool for Agricultural Best Management Practice Implementation in the Great Lakes Restoration Initiative Priority Watersheds—Upper East River, Tributary to Green Bay, Wisconsin

    USGS Publications Warehouse

    Merriman, Katherine R.

    2015-11-19

    The Great Lakes face a number of serious challenges that cause damage to water quality, habitat, ecology, and coastal health. Excess nutrients from point and nonpoint sources have a history of causing harmful algal blooms (HABs); since the late 1990s, a resurgence of HABs have forced beach closures and resulted in water quality impairments across the Great Lakes. Studies increasingly point to phosphorus (P) runoff from agricultural lands as the cause of these HABs. In 2010, the Great Lakes Restoration Initiative (GLRI) was launched to revitalize the Great Lakes. The GLRI aims to address the challenges facing the Great Lakes and provide a framework for restoration and protection. As part of this effort, the Priority Watersheds Work Group (PWWG), cochaired by the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Agriculture-Natural Resources Conservation Service (USDA–NRCS), is targeting Priority Watersheds (PWs) to reduce the amount of P reaching the Great Lakes. Within the PWs, USDA–NRCS identifies small-scale subbasins with high concentrations of agriculture for coordinated nutrient reduction efforts and enhanced monitoring and modeling. The USDA–NRCS supplies financial and/or technical assistance to producers to install or implement best management practices (BMPs) to lessen the negative effects of agriculture to water quality; additional funding is provided by the GLRI through USDA–NRCS to saturate the small-scale subbasins with BMPs. The watershed modeling component, introduced in this fact sheet, assesses the effectiveness of USDA–NRCS funded BMPs, and nutrient reductions because of GLRI or other funding programs are differentiated. Modeling scenarios consider BMPs that have already been applied and those planned to be implemented across the small-scale subbasins.

  19. LCA as a Tool to Evaluate Green Infrastructure's Environmental Performance

    NASA Astrophysics Data System (ADS)

    Catalano De Sousa, M.; Erispaha, A.; Spatari, S.; Montalto, F.

    2011-12-01

    Decentralized approaches to managing urban stormwater through use of green infrastructure (GI) often lead to system-wide efficiency gains within the urban watershed's energy supply system. These efficiencies lead to direct greenhouse gas (GHG) emissions savings, and also restore some ecosystem functions within the urban landscape. We developed a consequential life cycle assessment (LCA) model to estimate the life cycle energy, global warming potential (GWP), and payback times for each if GI were applied within a select neighborhood in New York City. We applied the SIMAPRO LCA software and the economic input-output LCA (EIO-LCA) tool developed by Carnegie Mellon University. The results showed that for a new intersection installation highlighted in this study a conventional infrastructure construction would emit and use approximately 3 times more for both CO2 and energy than a design using GI. Two GI benefits were analyzed with regards to retrofitting the existing intersection. The first was related to the savings in energy and CO2 at the Waste Water Treatment Plant via runoff reduction accrued from GI use. The second benefit was related to the avoided environmental costs associated with an additional new grey infrastructure installation needed to prevent CSO in case of no GI implementation. The first benefit indicated a high payback time for a GI installation in terms of CO2 and energy demand (80 and 90 years respectively) and suggest a slow energy and carbon recovery time. However, concerning to the second benefit, GI proved to be a sustainable alternative considering the high CO2 releases (429 MTE) and energy demand (5.5 TJ) associated with a grey infrastructure construction.

  20. CO2 exchange following peat extraction - a comparison of two paired restored/unrestored peatlands

    NASA Astrophysics Data System (ADS)

    Strachan, Ian; Strack, Maria; Pelletier, Luc; Nugent, Kelly; Rankin, Tracy

    2016-04-01

    Peat extraction is an important industry in parts of Canada and elsewhere globally. The resulting disturbance from drainage and vacuum-harvesting is mitigated through best practices which now incorporate restoration intended to return the peatland's biodiversity and greenhouse gas (GHG) exchange to that resembling the pre-disturbance state. We examine the net ecosystem exchange of CO2 (NEE) in two sets of paired peatlands. Within each pair, the extraction year was the same and the sites were treated identically post-extraction in terms of management (blocking drains or leveling as applicable). The first pair is located in the vicinity of Rivière-du-Loup, Québec, Canada and were harvested in 1980. The Bois-des-Bel (BDB) site was restored in 1999 following the methods of Quinty and Rochefort (2003). GHG fluxes have been studied at various points since restoration (e.g. Strack and Zuback, 2013) largely using chamber measurements. The site now hosts a thriving bog ecosystem with Sphagnum, Eriophorum and shrub communities. A site 30 km away near Saint-Alexandre de Kamouraska (SAK) was managed post-harvest as BDB with drains blocked but was left unrestored and now has only sparse Eriophorum with invasive species. The second pair of peatlands represents a newly extracted site near Seba Beach, Alberta, Canada. One field was restored (SBR) in autumn 2012 as per the Québec sites but with ditches infilled when the fields were levelled while the other (SBU) was left unrestored. In the summer of 2013, eddy covariance towers were installed at each location and measured NEE continuously at 10Hz throughout the subsequent periods. BDB and SBR remain operational today while SBU was removed in fall 2014 and SAK in fall 2015. In this presentation, we will focus on the coincident years of operation. After 15 years, BDB has measured NEE in the range of that observed at natural peatlands. A summer sink and winter release lead to annual uptake of CO2. At SAK, the lack of establishment of moss cover has led to the site remaining a source of CO2 to the atmosphere. SBR follows a trend towards becoming a weak sink for CO2 as vegetation re-establishes. SBU remained a weak source of CO2 to the atmosphere. The two restored sites showed more difference between years than did the unrestored sites, presumably caused by vegetation responding to the different environmental conditions within a growing season.

  1. What Should a Restored River Look Like? (Invited)

    NASA Astrophysics Data System (ADS)

    Florsheim, J. L.; Chin, A.

    2010-12-01

    Removal of infrastructure such as dams, levees, and erosion control structures is a promising approach toward restoring river system connectivity, processes, and ecology. Significant management challenges exist, however, related to removal of such structures that have already transformed riparian processes or societal perceptions. Here, we consider the effects of bank erosion infrastructure versus the benefits of allowing channel banks to erode in order to address the question: what should a restored river look like? The extent of channel bank infrastructure globally is unknown; nevertheless, it dominates rivers in most urban areas and is growing in rural areas as small projects merge and creeks and rivers are progressively channelized. Bank erosion control structures are usually installed to limit land loss and to reduce associated hazards. Structures are sometimes themselves considered restoration under the assumption that sediment erosion is bad for ecosystems. Geomorphic and ecological effects of bank erosion control structures are well understood, however, and include loss of sediment sources, bank substrate, dynamic geomorphic processes, and riparian habitat. Thus, a rationale for allowing eroding banks in restored rivers is as follows: 1) bank erosion processes are a component of system-scale channel adjustment needed to accommodate variable hydrology and sediment loads and to promote long-term stability; 2) bank erosion is a source of coarse and fine sediment to channels needed to maintain downstream bed elevations and topographic heterogeneity; and 3) bank erosion is a component of river migration, a process that promotes riparian vegetation succession and provides large woody material and morphologic diversity required to sustain habitat and riparian biodiversity. When structures that were originally intended to control or manage dynamic natural processes such as flooding and erosion are removed, not surprisingly, a return to dynamic processes may cause economic and cultural impacts to a public that that has often encroached on land too close to the riparian zone to accommodate the magnitude of these processes. Thus, to accomplish river system restoration in rural areas, science is needed to inform policy-makers and managers about the multidimensional physical extent of the riparian zone required for restoration of bio-hydro-geomorphic processes that promote functioning ecology. In urban areas, river system restoration requires a long-term dedication to education, fund raising for land acquisition, infrastructure removal, as well as planning, new riparian policy, governance, and management that takes into account the value and dynamic nature of river processes. So, what should a restored river look like? The banks of the restored river might be thought of as an aquatic-terrestrial ecotone that is longitudinally, laterally, and vertically connected to adjacent ecosystems. This ecotone includes a non-stationary mosaic of bare ground, irregular topography, live vegetation of diverse ages, sizes, and type, dead woody material, and diverse fauna.

  2. US army land condition-trend analysis (LCTA) program

    NASA Astrophysics Data System (ADS)

    Diersing, Victor E.; Shaw, Robert B.; Tazik, David J.

    1992-05-01

    The US Army Land Condition-Trend Analysis (LCTA) program is a standardized method of data collection, analysis, and reporting designed to meet multiple goals and objectives. The method utilizes vascular plant inventories, permanent field plot data, and wildlife inventories. Vascular plant inventories are used for environmental documentation, training of personnel, species identification during LCTA implementation, and as a survey for state and federal endangered or threatened species. The permanent field plot data documents the vegetational, edaphic, topographic, and disturbance characteristics of the installation. Inventory plots are allocated in a stratified random fashion across the installation utilizing a geographic information system that integrates satellite imagery and soil survey information. Ground cover, canopy cover, woody plant density, slope length, slope gradient, soil information, and disturbance data are collected at each plot. Plot data are used to: (1) describe plant communities, (2) characterize wildlife and threatened and endangered species habitat, (3) document amount and kind of military and nonmilitary disturbance, (4) determine the impact of military training on vegetation and soil resources, (5) estimate soil erosion potential, (6) classify land as to the kind and amount of use it can support, (7) determine allowable use estimates for tracked vehicle training, (8) document concealment resources, (9) identify lands that require restoration and evaluate the effectiveness of restorative techniques, and (10) evaluate potential acquisition property. Wildlife inventories survey small and midsize mammals, birds, bats, amphibians, and reptiles. Data from these surveys can be used for environmental documentation, to identify state and federal endangered and threatened species, and to evaluate the impact of military activities on wildlife populations. Short- and long-term monitoring of permanent field plots is used to evaluate and adjust land management decisions.

  3. A Three-Phase Microgrid Restoration Model Considering Unbalanced Operation of Distributed Generation

    DOE PAGES

    Wang, Zeyu; Wang, Jianhui; Chen, Chen

    2016-12-07

    Recent severe outages highlight the urgency of improving grid resiliency in the U.S. Microgrid formation schemes are proposed to restore critical loads after outages occur. Most distribution networks have unbalanced configurations that are not represented in sufficient detail by single-phase models. This study provides a microgrid formation plan that adopts a three-phase network model to represent unbalanced distribution networks. The problem formulation has a quadratic objective function with mixed-integer linear constraints. The three-phase network model enables us to examine the three-phase power outputs of distributed generators (DGs), preventing unbalanced operation that might trip DGs. Because the DG unbalanced operation constraintmore » is non-convex, an iterative process is presented that checks whether the unbalanced operation limits for DGs are satisfied after each iteration of optimization. We also develop a relatively conservative linear approximation on the unbalanced operation constraint to handle larger networks. Compared with the iterative solution process, the conservative linear approximation is able to accelerate the solution process at the cost of sacrificing optimality to a limited extent. Simulation in the IEEE 34 node and IEEE 123 test feeders indicate that the proposed method yields more practical microgrid formations results. In addition, this paper explores the coordinated operation of DGs and energy storage (ES) installations. The unbalanced three-phase outputs of ESs combined with the relatively balanced outputs of DGs could supply unbalanced loads. In conclusion, the case study also validates the DG-ES coordination.« less

  4. A Three-Phase Microgrid Restoration Model Considering Unbalanced Operation of Distributed Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Zeyu; Wang, Jianhui; Chen, Chen

    Recent severe outages highlight the urgency of improving grid resiliency in the U.S. Microgrid formation schemes are proposed to restore critical loads after outages occur. Most distribution networks have unbalanced configurations that are not represented in sufficient detail by single-phase models. This study provides a microgrid formation plan that adopts a three-phase network model to represent unbalanced distribution networks. The problem formulation has a quadratic objective function with mixed-integer linear constraints. The three-phase network model enables us to examine the three-phase power outputs of distributed generators (DGs), preventing unbalanced operation that might trip DGs. Because the DG unbalanced operation constraintmore » is non-convex, an iterative process is presented that checks whether the unbalanced operation limits for DGs are satisfied after each iteration of optimization. We also develop a relatively conservative linear approximation on the unbalanced operation constraint to handle larger networks. Compared with the iterative solution process, the conservative linear approximation is able to accelerate the solution process at the cost of sacrificing optimality to a limited extent. Simulation in the IEEE 34 node and IEEE 123 test feeders indicate that the proposed method yields more practical microgrid formations results. In addition, this paper explores the coordinated operation of DGs and energy storage (ES) installations. The unbalanced three-phase outputs of ESs combined with the relatively balanced outputs of DGs could supply unbalanced loads. In conclusion, the case study also validates the DG-ES coordination.« less

  5. Effects of artificial hypolimnetic oxygenation in a shallow lake. Part 1: phenomenological description and management.

    PubMed

    Toffolon, Marco; Ragazzi, Marco; Righetti, Maurizio; Teodoru, Cristian R; Tubino, Marco; Defrancesco, Chiara; Pozzi, Sabrina

    2013-01-15

    Artificial oxygenation is a common management technique for lake restoration, but the use of hypolimnetic aeration in shallow basins can have dramatic effects on the dynamics of thermal stratification. This study presents the results of extensive field measurements performed in Lake Serraia (Trentino, Italy) after the installation of a Side Stream Pumping System, whereby oxygen-rich water is injected through 24 jets, uniformly distributed along an octagonal-shaped pipe at approximately 1 m above the sediment floor (10 m in depth). The lake is characterised by an average depth of 7 m, a volume of 3.1 × 10(6) m(3) and a residence time of about one year. Prior to the installation of the pumping system, the undisturbed hypolimnion thickness during summer stratification was relatively small. After the start of oxygen injection (up to 0.5 m(3)/s of oxygen-saturated water), an increase of in-lake temperature over the entire water column was noted with a maximum hypolimnetic temperature increase of up to 9 °C. The analysis of the flow field data and the results of numerical simulations (presented in the companion paper), indicate that the jets were solely responsible for the observed increase in temperature. Moreover, this study shows that modelling efforts are useful to provide guidelines for optimising contrasting needs (e.g., increase in oxygen supply versus jet discharge rate). Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. A water-budget approach to restoring a sedge fen affected by diking and ditching

    USGS Publications Warehouse

    Wilcox, Douglas A.; Sweat, Michael J.; Carlson, Martha L.; Kowalski, Kurt P.

    2006-01-01

    A vast, ground-water-supported sedge fen in the Upper Peninsula of Michigan, USA was ditched in the early 1900s in a failed attempt to promote agriculture. Dikes were later constructed to impound seasonal sheet surface flows for waterfowl management. The US Fish and Wildlife Service, which now manages the wetland as part of Seney National Wildlife Refuge, sought to redirect water flows from impounded C-3 Pool to reduce erosion in downstream Walsh Ditch, reduce ground-water losses into the ditch, and restore sheet flows of surface water to the peatland. A water budget was developed for C-3 Pool, which serves as the central receiving and distribution body for water in the affected wetland. Surface-water inflows and outflows were measured in associated ditches and natural creeks, ground-water flows were estimated using a network of wells and piezometers, and precipitation and evaporation/evapotranspiration components were estimated using local meteorological data. Water budgets for the 1999 springtime peak flow period and the 1999 water year were used to estimate required releases of water from C-3 Pool via outlets other than Walsh Ditch and to guide other restoration activities. Refuge managers subsequently used these results to guide restoration efforts, including construction of earthen dams in Walsh Ditch upslope from the pool to stop surface flow, installation of new water-control structures to redirect surface water to sheet flow and natural creek channels, planning seasonal releases from C-3 Pool to avoid erosion in natural channels, stopping flow in downslope Walsh Ditch to reduce erosion, and using constructed earthen dams and natural beaver dams to flood the ditch channel below C-3 Pool. Interactions between ground water and surface water are critical for maintaining ecosystem processes in many wetlands, and management actions directed at restoring either ground- or surface-water flow patterns often affect both of these components of the water budget. This approach could thus prove useful in guiding restoration efforts in many hydrologically altered and managed wetlands worldwide.

  7. Portfolio Decision Analysis Framework for Value-Focused Ecosystem Management

    PubMed Central

    Convertino, Matteo; Valverde, L. James

    2013-01-01

    Management of natural resources in coastal ecosystems is a complex process that is made more challenging by the need for stakeholders to confront the prospect of sea level rise and a host of other environmental stressors. This situation is especially true for coastal military installations, where resource managers need to balance conflicting objectives of environmental conservation against military mission. The development of restoration plans will necessitate incorporating stakeholder preferences, and will, moreover, require compliance with applicable federal/state laws and regulations. To promote the efficient allocation of scarce resources in space and time, we develop a portfolio decision analytic (PDA) framework that integrates models yielding policy-dependent predictions for changes in land cover and species metapopulations in response to restoration plans, under different climate change scenarios. In a manner that is somewhat analogous to financial portfolios, infrastructure and natural resources are classified as human and natural assets requiring management. The predictions serve as inputs to a Multi Criteria Decision Analysis model (MCDA) that is used to measure the benefits of restoration plans, as well as to construct Pareto frontiers that represent optimal portfolio allocations of restoration actions and resources. Optimal plans allow managers to maintain or increase asset values by contrasting the overall degradation of the habitat and possible increased risk of species decline against the benefits of mission success. The optimal combination of restoration actions that emerge from the PDA framework allows decision-makers to achieve higher environmental benefits, with equal or lower costs, than those achievable by adopting the myopic prescriptions of the MCDA model. The analytic framework presented here is generalizable for the selection of optimal management plans in any ecosystem where human use of the environment conflicts with the needs of threatened and endangered species. The PDA approach demonstrates the advantages of integrated, top-down management, versus bottom-up management approaches. PMID:23823331

  8. Portfolio Decision Analysis Framework for Value-Focused Ecosystem Management.

    PubMed

    Convertino, Matteo; Valverde, L James

    2013-01-01

    Management of natural resources in coastal ecosystems is a complex process that is made more challenging by the need for stakeholders to confront the prospect of sea level rise and a host of other environmental stressors. This situation is especially true for coastal military installations, where resource managers need to balance conflicting objectives of environmental conservation against military mission. The development of restoration plans will necessitate incorporating stakeholder preferences, and will, moreover, require compliance with applicable federal/state laws and regulations. To promote the efficient allocation of scarce resources in space and time, we develop a portfolio decision analytic (PDA) framework that integrates models yielding policy-dependent predictions for changes in land cover and species metapopulations in response to restoration plans, under different climate change scenarios. In a manner that is somewhat analogous to financial portfolios, infrastructure and natural resources are classified as human and natural assets requiring management. The predictions serve as inputs to a Multi Criteria Decision Analysis model (MCDA) that is used to measure the benefits of restoration plans, as well as to construct Pareto frontiers that represent optimal portfolio allocations of restoration actions and resources. Optimal plans allow managers to maintain or increase asset values by contrasting the overall degradation of the habitat and possible increased risk of species decline against the benefits of mission success. The optimal combination of restoration actions that emerge from the PDA framework allows decision-makers to achieve higher environmental benefits, with equal or lower costs, than those achievable by adopting the myopic prescriptions of the MCDA model. The analytic framework presented here is generalizable for the selection of optimal management plans in any ecosystem where human use of the environment conflicts with the needs of threatened and endangered species. The PDA approach demonstrates the advantages of integrated, top-down management, versus bottom-up management approaches.

  9. Technical aspects of the Space Telescope Imaging Spectrograph Repair (STIS-R)

    NASA Astrophysics Data System (ADS)

    Rinehart, S. A.; Domber, J.; Faulkner, T.; Gull, T.; Kimble, R.; Klappenberger, M.; Leckrone, D.; Niedner, M.; Proffitt, C.; Smith, H.; Woodgate, B.

    2008-07-01

    In August 2004, the Hubble Space Telescope (HST) Space Telescope Imaging Spectrograph (STIS) ceased operation due to a failure of the 5V mechanism power converter in the Side 2 Low Voltage Power Supply (LVPS2). The failure precluded movement of any STIS mechanism and, because of the earlier (2001) loss of the Side 1 electronics chain, left the instrument shuttered and in safe mode after 7.5 years of science operations. A team was assembled to analyze the fault and to determine if STIS repair (STIS-R) was feasible. The team conclusively pinpointed the Side 2 failure to the 5V mechanism converter, and began studying EVA techniques for opening STIS during Servicing Mission 4 (SM4) to replace the failed LVPS2 board. The restoration of STIS functionality via surgical repair by astronauts has by now reached a mature and final design state, and will, along with a similar repair procedure for the Advanced Camera for Surveys (ACS), represent a first for Hubble servicing. STIS-R will restore full scientific functionality of the spectrograph on Side 2, while Side 1 will remain inoperative. Because of the high degree of complementarity between STIS and the new Cosmic Origins Spectrograph (COS, to be installed during SM4)), successful repair of the older spectrograph is an important scientific objective. In this presentation, we focus on the technical aspects associated with STIS-R.

  10. Effect of dewatering on seismic performance of multi-anchor wall due to high ground water level

    NASA Astrophysics Data System (ADS)

    Kobayashi, Makoto; Miura, Kinya; Konami, Takeharu; Hayashi, Taketo; Sato, Hiroki

    2017-10-01

    Previous research reported that the ground water in the backfill of reinforced soil wall made it deteriorate. According to the damage investigation of Great East Earthquake 2011, the reinforced soil structure due to high ground water level by seismic wave were deformed remarkably. Some of them classified ultimate limit state or restorability limit state. However, more than 90% of reinforced soil structure, which suffered from this earthquake, were classified into no damage condition. Therefore, it is necessary that the seismic behaviors of multi-anchor wall due to seepage flow should be clarified in order to adopt the performance-based design in such reinforced soil structure. In this study, a series of centrifugal shaking table tests were conducted to investigate the seismic behavior of multi-anchor wall due to high ground water level. The reinforced drainage pipes were installed into the backfill in order to verify the dewatering effect and additional reinforcement. Furthermore, to check only the dewatering effect, the model tests was carried out with several ground water table that was modeled the case reinforced drainage pipes installed. The test results show unique behavior of reinforced region that moved integrally. This implies that the reinforced region has been behaved as if it became one mass, and this behavior make this structure increase seismic performance. Thus, the effectiveness of dewatering was observed remarkably because of decreasing the inertial force during earthquake.

  11. High-Temperature Fluid-Wall Reactor Technology Research, Test and Evaluation Performed at Naval Construction Battalion Center, Gulfport, Mississippi, for the United States Air Force Installation/Restoration Program

    DTIC Science & Technology

    1988-01-01

    the reactor Duties: The Process Engineers rotate with the Lead Operator to monitor the process at the top of the reactor through the site glass...pant cuffs and coverhoods of coveralls, will be attached to gloves, boots and coveralls, using duct tape. * IF AMBIENT WORK STATIONS TEMPERATURE IS...L of the sample fortification solution (Section ýý8) containing 1C 12-2,3,7,8-TCDD at a concentration of 0.5 ng/1,Land C14-2,3,7,8-TCDD at a

  12. AmeriFlux US-Tw1 Twitchell Wetland West Pond

    DOE Data Explorer

    Baldocchi, Dennis [University of California, Berkeley

    2016-01-01

    This is the AmeriFlux version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond. Site Description - The Twitchell Wetland site is a 7.4-acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 25 cm. The wetland was almost completely covered by cattails and tules by the third growing season. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on May 17, 2012.

  13. Installation Restoration Program. 156th Tactical Fighter Group, Puerto Rico ANG, Luis Munoz Marin International Airport, San Juan, Puerto Rico; 140th Aircraft Control and Warning Squadron, Puerto Rico ANG, Toa Baja, Puerto Rico; and 141st Aircraft Control and Warning Squadron, Puerto Rico ANG, Aguadilla, Puerto Rico

    DTIC Science & Technology

    1988-10-01

    SETTING. .. .. .... .... .... .... .... -1 A. Meteorology .. .. ..... .... .... .... ....... -1 B. Geology .. .. ..... .... .... .... .... ..... -1 C...2a.’~1 quadrangles, San Lcto a fte16hTG uroRcJuan and Carolina, Lcto a fte16hTG uroRcPuerto Rica . Air National Guard, San Juan, Puerto Rico.3 Boca de...precipitation in this area is negative 27.8 inches per year and maximum rainfall intensity is approximately 9 inches. B. Geology Puerto Rico is the

  14. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 2. Elmendorf Air Force Base, Alaska.

    DTIC Science & Technology

    1988-03-01

    50 BLM - - - in use Oil Well Road 51 63-501 - - - in use 6981st Rec Area Six Mile Lake 52 23-100 166. A 36 in use Golf Course Pro Shop 53 62-145 125...q K, -- p *K. % K.. K.,., ~* K,. .~ A , A .U .AAA.J A A J~...K A. ..A ,.A - . OKIRACoks con 55 ORDER FOR SUPPL) ES OR SERVICES 1 .2 2. PROC...SYC/AGENCY tt.SURV 20. TOTAL AMOUNT~CeNT USE CRIT A. PST a CONRACTADMIN A. ASTU CNTRCT C. ARSTNAC? RECIP 0. SPL CON ? FuEC PAT It KNDN 421 TYPE ASP

  15. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for Mather AFB, Sacramento, California. Volume 2. Appendices.

    DTIC Science & Technology

    1986-06-01

    SAC Strategic Air Command sedimentary Describes rocks resulting from aepo- sition of transported material that has accumulated in layers semi-confined...provided in a separately bound appendix to the draft final report. L. Meetings The contractor’s project leader shall attend two meetings, to be he_...I ’~’UO’’ I. - P P I--D Q P22PPP~b ~QPZ _’P- bPP ?Pf tnN -7-p (1)N Ir-J -1 0 (D u-iU v u AD-A184 581 INSI~A LLATION HISTORATI ON PRO ~AM PHASE 2 7CON

  16. Installation Restoration Program. Phase 2. Confirmation/Quantification, Stage 2 for Seymour Johnson Air Force Base, North Carolina. Volume 4

    DTIC Science & Technology

    1988-11-01

    BENZIDINE 400 81)1 5 BENZO (a) ANTHRACENE 400 ODL 6 BENZ0 (a) PYRENE 400 61 )1 7 BENZO (b) FLUORANTHENE 400 61 )1 a BENZO (ghl) PERYLENE 1003 61 )1 9...BENZO (k) FLUIORANTHENE 400 61 )1 10 815 (2-CHOROEThOXY) METHANE 400 81)1 11 815 (2-CHOROETIIYL) ETHER 400 BDL 12 8(5 (2-CHLOROISOPROPYL) ETHER 400 BDL 13...CHOROPHENYL PHENYL ETHER 400 61 )1 18 CHRYSENE 400 B1)L - 19 DIBEIQO (ah) ANTHRACENE 400 81)1 20 1,2-DICHOROBENZENE 400 81)1 21 1 ,3-DICHLOROBENZENE

  17. Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1. Volume 2. Appendices A-M. Cannon AFB, New Mexico.

    DTIC Science & Technology

    1986-09-01

    0’ - N tT qT -0 t" C-r C-, M z a <CLW 4 0 a. o.CL- C= un z LJJIIr-= r -I CiA c= cot ’ rcli LAJI LUU CLCL LLI- IOUa a. IF LLJLm I-l - ( Cft - 4 CL...Depth Graphic Core Sample Sample Cft ) Log Interval/ID Taken* Lithologic Description 0- .. ~.G TOPSOIL; with some wood and other debris. 5-.~J SB-lA-1 ST...Date Recev 7 T ime~ L Transported By La- aml No. 0,; 0 Comments_____________________ ________ ___ Inclusive Dates of Possession

  18. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 6, Cobb County, Georgia. Volume 3.

    DTIC Science & Technology

    1986-08-09

    WATER ASSESSMENT PROGRAM AIR FOsEa PLANT 6, L0CKED-GEOCIA CONPANY MARIETTA, GMO IA PROJECT NO. 611059 WELL 4W-22 WELL 4W-23 WELL MW-24 WELL 4W-25 Dace...PROGRAMo PHASE II--CONFIRMATION/QUANTIFICATION 0STAGE I Final Report for AIR FORCE PLANT 6, COBB COUNTY, GA. U.S. AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL...Con uet on reverse 4 necessary arc .entir’y ay )lcx "UrCer) I;;EL_0 GROUP I SUB-GROuP Air Force Plant , Hazardous materialsI oilS’ DeB Ground water, S

  19. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Sites 24-WF15, 25-WF22 and 26-BST5. U.S. Air Force Plant No. 42, Palmdale, California.

    DTIC Science & Technology

    1988-06-15

    Primary Metals: CA Title 2:60 e Arsenic 0.005 mg/L~~ Barium 0.005 mg/LICadmium 0.005 mg/L Chromium 0.01 mg/L Lead 0.05 mg/L Mercury 0.001 mg/L Selenium...analyzed for twelve metals: arsenic (As), barium (Ba), cadmium (Ca), chromium (COr), lead (Pb), mer- cury (Hg), selenium (Se), silver (Ag), iron (Fe...Total Threshold Limit Substnce (mg/L) (mg/Kg) Arsenic 5.0 500 Barium (excludingf barium sulfate) 100 10,000 Cadmium 1.0 100 Chromium VI 5 500 Chromium

  20. Eareckson AFS, Alaska (Formerly Shemya AFB, Alaska): 1993 Installation Restoration Program Basewide and Limited Source Investigation, Work Plan

    DTIC Science & Technology

    1993-12-01

    porphyry intrusives that crop out along the northeast and southeast shores and locally inland. Bedrock lithology is only rarely described in the borehole...kg). Groundwater samples contained arsenic (62.8 mg/L to 66.9 mg/L), chromium (19.2 mg/L to 80 mg/L), copper (52.9 mg/L to 255 mg/L), zinc (163 mg/L...0.17 mg/L; nitrate/nitrite ranging from 0.038 mg/L to 1.41 mg/L; copper at 9.6 pg/I; zinc at 13.3 pg/L; and bis (2-ethylhexyl) phthalate at 1 /ig/L

  1. Installation Restoration Program. Volume 3. 152nd Tactical Reconnaissance Group, Nevada Air National Guard, Reno Cannon International Airport, Reno, Nevada

    DTIC Science & Technology

    1994-04-01

    N F-67 PROJECTt REINO AZR NATIONAL GUARD DATE:03/25/94 ANALYSIS: BNA - CONTANINATZON REPORT REVIEWER: DENNIS MART27...10SS 0.569 0.7021 -23.4 T 12/14/92 2259 CRIoemmA 3 loSS 0.027 1.011 -22.2 T 12/14/92 2259 DIO 1055 l 0.703 .0.11 -22.5 T 12/14/92 2259 NTUL= CULORIDS...seetma. rule VOL DIo -U-T...z..-- 1064 1055 Perocnt D in the Coatcal ezood limits. wa 1064 10ss The ouaes.. does not met 52/102 no contemin. rule NIT

  2. Installation Restoration Program. Phase 1 - Records Search, Travis AFB, California

    DTIC Science & Technology

    1983-08-01

    Personnel Transportation Assistance Office Navy Construction Office (ROICC) Navy Quick Trans CPE Cargo OL-K AFESC/CEMRT OL OH AF Commissary/ FCS Operating Loc...du u U C AS I- z I- < L z Z ’CIA F,.- **z z - C -o -C Z. -2 X.,~a S.. ’ l - x CO I II I EAI IIV I - -. I t1 -1 z In-’S I LA- 0..u 2gU, 0 z u Fc -jIL...used at the site comprised, AFFF , protein foam and water. The site has no berms or dikes to contain the runoff. Surface runoff from the site has to

  3. Installation Restoration Program. Phase 1 - Records Search, Castle AFB, California

    DTIC Science & Technology

    1983-10-01

    2 WAEEESnm vl-dddwd. ,de~, ~~~~~S.’. 4.. fC . 4h.1 Ff* To n 4w .64w Sim. .23 " -ta. fqU % . V.int i. few I. i& xi & T s - -f - R //5 . " T...iaaPa 1 l] 4 W. 0. 2162 W=L NO. 34-A Atwater District NW* of Section 6-7-13 Drilled by No I.D. December 194 0 - 5 Soil 541 or 18" #14 Ga. Double...Air Force Base. AFESC: Air Force Engineering and Services Center. AFFF : Aqueous Film Forming Foam, a fire extinquishing agent. *APR: Air Force

  4. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 4, Fort Worth, Texas. Volume 5. Appendix A-2.

    DTIC Science & Technology

    1987-12-01

    Limit Spiked Samale Samole ISailced C" auod R sIus’lt (SSR) esult. (SR) A-dded ( .SA) Iels: I. I 1. A.luminum 75-125 - I Z. Antimony - 3. Arsenic " I...UntKtarix *s %Control Limit Spiked Samale Sample SieiCm.,ound _ _R R esult (SSR) Re t,.- (SR) Added (SA) Z,10 1. AUlunu m 7 I I I 2. Antimonyj ____ 3...No. DATE Lab Sample) ;S4 No Katrix waot, " . n ...Central L imi Spiked Samale Samale Spiked Comnpound M Rsult: (SSR) Result (SR) jAdded (SA) XR

  5. Installation Restoration Program. Remedial Investigation Report. Minnesota Air National Guard Base Duluth International Airport, Duluth, Minnesota. Volume 3

    DTIC Science & Technology

    1990-01-01

    Migration 5-7 5.2.3 Contaminant Persistence 5-8 5.2.4 Contaminant Mobility and Migration 5-9 5.2.4.1 Contaminant Migration in Surface Water 5-9...of Contaminant 5-11 5.3.2 Potential Routes of Migration 5-11 5.3.3 Contaminant Persistence 5-12 5.3.4 Contaminant Mobility and Migration 5-13 5.3.4.1...Contaminant Mobility and Migration in Soil 5-18 5.6 CONTAMINANT FATE AND TRANSPORT 5-18 AT SITE 10 5.6.1 Summary of Contaminants 5-18 5.6.2 Potential Routes

  6. There's always a villain to punish: group processes contributing to violence and its remediation.

    PubMed

    Thomas, Nina K

    2015-01-01

    This paper considers the widespread use of violent metaphors, such as "combat" and "war," to represent the current social, psychological, and political problems within the United States. I apply Lakoff and Johnson's (1980) thesis that metaphor shapes thought, policy, and behavior. I examine how use of such metaphors inclines the national consciousness toward violence and punishment for it. In addition, I discuss shame and humiliation as psychological precursors of violence, particularly as these play out in the exclusion and extrusion via group scapegoating of individuals and whole groups from active participation in an esteemed or powerful other group. Included within the concept of "violence" are those harmful social policies that invalidate the experiences of disempowered people within the United States. I consider the role of group processes in resolving the injuries wrought by violence, particularly as these operate within such restorative justice projects as the Glencree Ex-Combatants Programme in Northern Ireland. Lessons emerge from restorative justice projects installed internationally for ameliorating conflict within and between "victim" groups in the United States.

  7. A Study on an Analysis and Design of the Internal Structure of Heumgyeonggak-nu

    NASA Astrophysics Data System (ADS)

    Kim, Sang Hyuk; Yun, Yong-Hyun; Ham, Seon Young; Mihn, Byeong-Hee; Ki, Ho-Chul; Yoon, Myung-Kyoon

    2017-06-01

    In this study, the internal structure of a Heumgyeonggak-nu (欽敬閣漏) was designed, and the power transmission mechanism was analyzed. Heumgyeonggak-nu is an automated water clock from the Joseon Dynasty that was installed within Heumgyeonggak (欽敬閣), and it was manufactured in the 20th year of the reign of King Sejong (1438). As descriptions of Heumgyeonggak-nu in ancient literature have mostly focused on its external shape, the study of its internal mechanism has been difficult. A detailed analysis of the literature record on Heumgyeonggak-nu (e.g., The Annals of the Joseon Dynasty) indicates that Heumgyeonggaknu had a three-stage water clock, included a waterfall or tilting vessel (欹器) using the overflowed water, and displayed the time using a ball. In this study, the Cheonhyeong apparatus, water wheel, scoop, and various mechanism wheels were designed so that 16 fixed-type scoops could operate at a constant speed for the water wheel with a diameter of 100 cm. As the scoop can contain 1.25 l of water and the water wheel rotates 61 times a day, a total of 1,220 l of water is required. Also, the power gear wheel was designed as a 366-tooth gear, which supported the operation of the time signal gear wheel. To implement the movement of stars on the celestial sphere, the rotation ratio of the celestial gear wheel to the diurnal motion gear ring was set to 366:365. In addition, to operate the sun movement apparatus on the ecliptic, a gear device was installed on the South Pole axis. It is expected that the results of this study can be used for the manufacture and restoration of the operation model of Heumgyeonggak-nu.

  8. Diablotin Pterodroma hasitata: a biography of the endangered Black-capped Petrel

    USGS Publications Warehouse

    Simons, Theodore R.; Lee, David S.; Haney, J. Christopher

    2013-01-01

    Our findings are in accord with the recent decision by the US Fish and Wildlife Service (USFWS) to evaluate the need for additional protection of the species and the primary foraging habitat off the southeastern United States under the Endangered Species Act (USFWS 2012). Additional conservation measures and research strategies that warrant further consideration include (1) protection, monitoring, and management of known breeding populations and nesting habitat in the Dominican Republic and Haiti through controlling predators, installing artificial nest burrows in appropriate sites and hiring local wardens at breeding sites during the nesting season; (2) local and regional training, education and public awareness (e.g. Blanchard & Nettleship 1992); (3) restoration of the original common name Diablotin to common usage to promote the historical and cultural importance of this species; (4) studies to determine the distribution and genetic variability in the remaining populations; and (5) studies of satellite-tagged birds to assess their seasonal and geographic use of pelagic habitats.

  9. Hydrologic data at a wetland site, Millington, Shelby County, Tennessee, June 1993 through June 1994

    USGS Publications Warehouse

    Robinson, J.A.; Diehl, T.H.; Stogner, R.W.

    1996-01-01

    Hydrologic data at a wetland site near Millington, Shelby County, Tennessee, were collected from June 1993 through June 1994. The data were collected to support the efforts of the Tennessee Department of Transportation to better understand hydrologic properties at the site prior to wetland restoration. Water levels were monitored in thirteen 8-inch- diameter wells, approximately 2 feet deep. The casing in each well was slotted and screened from land surface to a depth of about 2 feet. Water-level recorders provided continuous records of stage during periods of wetland inundation, and depth to water table during periods of noninundation. A continuous-stage recorder was installed in a pond. Precipitation data were obtained from the Naval Air Station-Memphis, Millington, Tennessee. Land surface at the wells was inundated from 0 to 56 percent of the study period. Additionally, water levels in the wells were not more than 1.5 feet below land surface for 16 to 68 percent of the study period.

  10. Application of photo-detection to art and archaeology at the C2RMF

    NASA Astrophysics Data System (ADS)

    Calligaro, T.; Dran, J.-C.; Klein, M.

    2003-05-01

    The Centre for research and restoration of the museums of France (C2RMF), located in the Louvre palace in Paris routinely uses photodetector-based techniques for the study of objects of cultural heritage. Among these methods, the ion beam analysis techniques (IBA) provided by the 2-MV electrostatic accelerator "AGLAE" installed in the C2RMF have the specific qualities required for the study of these valuable objects. Indeed, PIXE and PIGE are non-destructive, non-invasive, rapid and sensitive tools for the determination of the chemical composition. Their use enables to answer three major questions in the field of Art and Archaeology: (1) identification of the material, (2) determination of the provenance, and (3) study of surface modification (ageing, alteration). Applications of radiation detectors are exemplified through case studies performed at the Centre: the identification of the pigments used on an Egyptian papyrus, the provenance of gemstones set on ancient jewels and the indirect dating of archaeological flints. New trends in the use of photo-detectors in Art and Archaeology are presented.

  11. Characterization of the Long-term Subsurface Warming Observed at the Apollo 15 and 17 Sites Utilizing the Newly Restored Heat Flow Experiment Data from 1975 to 1977

    NASA Astrophysics Data System (ADS)

    Nagihara, S.; Kiefer, W. S.; Taylor, P. T.; Williams, D. R.; Nakamura, Y.; Krell, J. W.

    2017-12-01

    The Apollo Heat Flow Experiment (HFE) was conducted at landing sites 15 and 17 as part of the Apollo Lunar Surface Experiment Package (ALSEP) program. At each site, the astronauts drilled 2 holes, 10-m apart, and installed a probe in each. The probes monitored surface and subsurface temperatures. The Apollo 15 probes operated from July 1971 to January 1977. The Apollo 17 probes operated from December 1972 to September 1977. For both sites, only data from the beginning to December 1974 were archived previously. We have restored major portions of the 1975-1977 HFE data for both sites from two sets of sources recently recovered. One was the original ALSEP archival data tapes, from which raw HFE data were extracted and processed according to the procedure and the calibration data specified by the original investigators. The other was the ALSEP Performance Summary Reports, which included weekly logs of temperature readings from the deepest sensor of each of the probes. The original HFE investigators noted that temperature of the regolith well below the thermal skin depth ( 1 m) rose gradually through December 1974 at both sites. Possible causes of the warming have been debated since. The restored 1975-1977 HFE data allow more detailed characterization of this phenomenon, especially for the Apollo 17 site, for which the duration of data availability has more than doubled. For both sites, the subsurface warming continued till the end of observations. Simultaneously, thermal gradient decreased. Such behavior is consistent with one of the hypotheses proposed by the original investigators; temperature of the lunar surface around the probe increased by 2 to 4 K at the time of deployment. Consequently, the subsurface thermal regime gradually adjusted to the new boundary condition. The Lunar Reconnaissance Orbiter Camera images taken over the Apollo landing sites suggest that astronaut-induced surface disturbance resulted in lower albedo, and that should have raised average surface temperature. Other explanations may also be possible. For example, at the Apollo 15 site, it is known that radiation down the hole affected the upper section of the probe. In contrast, the Apollo 17 probes were installed with radiation shields at the top of the hole and at 0.3-m depth. Therefore, warming there is more likely to be conductive in nature.

  12. Restoration of Secondary Containment in Double Shell Tank (DST) Pits

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SHEN, E.J.

    2000-10-05

    Cracks found in many of the double-shell tank (DST) pump and valve pits bring into question the ability of the pits to provide secondary containment and remain in compliance with State and Federal regulations. This study was commissioned to identify viable options for maintain/restoring secondary containment capability in these pits. The basis for this study is the decision analysis process which identifies the requirements to be met and the desired goals (decision criteria) that each option will be weighed against. A facilitated workshop was convened with individuals knowledgeable of Tank Farms Operations, engineering practices, and safety/environmental requirements. The outcome ofmore » this workshop was the validation or identification of the critical requirements, definition of the current problem, identification and weighting of the desired goals, baselining of the current repair methods, and identification of potential alternate solutions. The workshop was followed up with further investigations into the potential solutions that were identified in the workshop and through other efforts. These solutions are identified in the body of this report. Each of the potential solutions were screened against the list of requirements and only those meeting the requirements were considered viable options. To expand the field of viable options, hybrid concepts that combine the strongest features of different individual approaches were also examined. Several were identified. The decision analysis process then ranked each of the viable options against the weighted decision criteria, which resulted in a recommended solution. The recommended approach is based upon installing a sprayed on coating system.« less

  13. Alteration of stream temperature by natural and artificial beaver dams.

    PubMed

    Weber, Nicholas; Bouwes, Nicolaas; Pollock, Michael M; Volk, Carol; Wheaton, Joseph M; Wathen, Gus; Wirtz, Jacob; Jordan, Chris E

    2017-01-01

    Beaver are an integral component of hydrologic, geomorphic, and biotic processes within North American stream systems, and their propensity to build dams alters stream and riparian structure and function to the benefit of many aquatic and terrestrial species. Recognizing this, beaver relocation efforts and/or application of structures designed to mimic the function of beaver dams are increasingly being utilized as effective and cost-efficient stream and riparian restoration approaches. Despite these verities, the notion that beaver dams negatively impact stream habitat remains common, specifically the assumption that beaver dams increase stream temperatures during summer to the detriment of sensitive biota such as salmonids. In this study, we tracked beaver dam distributions and monitored water temperature throughout 34 km of stream for an eight-year period between 2007 and 2014. During this time the number of natural beaver dams within the study area increased by an order of magnitude, and an additional 4 km of stream were subject to a restoration manipulation that included installing a high-density of Beaver Dam Analog (BDA) structures designed to mimic the function of natural beaver dams. Our observations reveal several mechanisms by which beaver dam development may influence stream temperature regimes; including longitudinal buffering of diel summer temperature extrema at the reach scale due to increased surface water storage, and creation of cool-water channel scale temperature refugia through enhanced groundwater-surface water connectivity. Our results suggest that creation of natural and/or artificial beaver dams could be used to mitigate the impact of human induced thermal degradation that may threaten sensitive species.

  14. Alteration of stream temperature by natural and artificial beaver dams

    PubMed Central

    Bouwes, Nicolaas; Pollock, Michael M.; Volk, Carol; Wheaton, Joseph M.; Wathen, Gus; Wirtz, Jacob; Jordan, Chris E.

    2017-01-01

    Beaver are an integral component of hydrologic, geomorphic, and biotic processes within North American stream systems, and their propensity to build dams alters stream and riparian structure and function to the benefit of many aquatic and terrestrial species. Recognizing this, beaver relocation efforts and/or application of structures designed to mimic the function of beaver dams are increasingly being utilized as effective and cost-efficient stream and riparian restoration approaches. Despite these verities, the notion that beaver dams negatively impact stream habitat remains common, specifically the assumption that beaver dams increase stream temperatures during summer to the detriment of sensitive biota such as salmonids. In this study, we tracked beaver dam distributions and monitored water temperature throughout 34 km of stream for an eight-year period between 2007 and 2014. During this time the number of natural beaver dams within the study area increased by an order of magnitude, and an additional 4 km of stream were subject to a restoration manipulation that included installing a high-density of Beaver Dam Analog (BDA) structures designed to mimic the function of natural beaver dams. Our observations reveal several mechanisms by which beaver dam development may influence stream temperature regimes; including longitudinal buffering of diel summer temperature extrema at the reach scale due to increased surface water storage, and creation of cool—water channel scale temperature refugia through enhanced groundwater—surface water connectivity. Our results suggest that creation of natural and/or artificial beaver dams could be used to mitigate the impact of human induced thermal degradation that may threaten sensitive species. PMID:28520714

  15. Atraumatic restorative treatment (ART): a three-year clinical study in Malawi--comparison of conventional amalgam and ART restorations.

    PubMed

    Kalf-Scholte, Sonja M; van Amerongen, Willem E; Smith, Albert J E; van Haastrecht, Harry J A

    2003-01-01

    This study compares the quality of class I restorations made with the atraumatic restorative treatment (ART) technique and conventional class I amalgam restorations. The study was carried out among secondary school students in Mzuzu, Malawi. First-year students in 1987 who needed at least two class I restorations were selected. Based on a split-mouth design, each participant received both ART and conventional restorations. The 89 pairs of class I cavities were divided randomly into two groups, since two different cermet ionomer cement (CIC) filling materials were used. Impressions of the restorations and subsequent models were made shortly after restoration, after six months, one year, two years, and three years. The quality of the restorations was determined on the models following the US Public Health Service criteria. Bulk fracture, contour, marginal integrity, and surface texture of the restorations were recorded and evaluated separately. Survival rates were determined by the resultant score of all criteria. Though conventional amalgam restorations performed better on all criteria, this difference was significant only for the contour criterion. The survival rates of ART restorations after three years (81.0%) were lower than those of amalgam restorations (90.4%) (P=.067). The quality of ART class I restorations is competitive with that of conventional amalgam restorations.

  16. Clinical evaluation of two "packable" posterior composite resins.

    PubMed

    Lopes, L G; Cefaly, D F G; Franco, E B; Mondelli, R F L; Lauris, J R P; Navarro, M F L

    2002-06-01

    The purpose of this study was to evaluate the clinical performance of two "packable" posterior composites: Prodigy Condensable (P) (Kerr) and Definite (D) (Degussa). Thirty-six patients participated in the study. A total of 78 restorations were made, 40 with D and 38 with P. Each patient received at least two restorations, one of each studied material. The materials were handled according to the manufacturer's instructions. The restorations were finished and polished after 1 week. They were evaluated at baseline and after 1 year by two independent evaluators using the United States Public Health Service (USPHS) criteria. Colored slides were made of all the restorations. After 1 year, 35 patients and 76 restorations (39 with D and 37 with P) were available for evaluation. All restorations received A criteria except the following ones, which received B criteria: color P (one restoration) and D (one restoration), marginal staining P (three restorations) and D (two restorations), surface staining P (nine restorations) and D (three restorations), anatomic form P (one restoration) and D (three restorations), and marginal adaptation P (one restoration) and D (eight restorations). The obtained data were tabulated and statistically analyzed using the Fisher and McNemar tests. After 1 year, P showed a significant increase in superficial staining. For D, the marginal adaptation became significantly worse than baseline and P. The studied materials can be considered acceptable during this evaluation period. Further evaluations are necessary for a better clinical performance analysis.

  17. Installation Restoration Program. Preliminary Assessment: 143rd Tactical Airlift Group, Rhode Island Air National Guard, Quonset State Airport, North Kingstown, Rhode Island

    DTIC Science & Technology

    1990-06-01

    portions of the master plan and preliminary engineering for a new international airport for Lisbon, Portugal , estimated to cost $250 million. Self... sinES awtuc, SiC,9 @, Sta. 0.4.. Loc.’ el v t tim w . made weet of 66 water to. dril Sl thr0 g concrete.~ oa~~ 4.80 L0051 1.450, a. Di caes"J @tknwe...8217:par-i SI17. lilt)*~ fir, Sai~d. irav nir 1 ,l 111.-li 1s -w-i-l, a 6-Inch lent, Of coals ,- t. tint SANUI. li1tle Silt l(ll) GFIAPNhf SISCCULI/ O REMAR

  18. Air Conditioner/Dehumidifier

    NASA Technical Reports Server (NTRS)

    1986-01-01

    An ordinary air conditioner in a very humid environment must overcool the room air, then reheat it. Mr. Dinh, a former STAC associate, devised a heat pipe based humidifier under a NASA Contract. The system used heat pipes to precool the air; the air conditioner's cooling coil removes heat and humidity, then the heat pipes restore the overcooled air to a comfortable temperature. The heat pipes use no energy, and typical savings are from 15-20%. The Dinh Company also manufactures a "Z" coil, a retrofit cooling coil which may be installed on an existing heater/air conditioner. It will also provide free hot water. The company has also developed a photovoltaic air conditioner and solar powered water pump.

  19. Installation Restoration Program. Phase 1. Records Search, Hazardous Materials Disposal Sites, Eglin AFB, Florida

    DTIC Science & Technology

    1981-10-01

    Okaloosa Co. 3-12 Crestview South Quadrangle, Florida-Okaloosa Co. -13 Mossy ead Quadrangle, Florida-Walton Co 3-14 E-1 EGUN AFB 4,h aa V, WRAMATIO...I) Um AYPM hIN1DS SP * So". AM T 0 Tou A is a O I. h E-2 ES ENGINEERING -SCIENCE V%777-7NN7 .7-7 EGUN AFB 0.4 .m ... (1) WMg LAN DOSAMU *Y* CO u...r Oumm *p S(S Ann~ Il~~O 0*aAMa 2-3 ES ENGINEER ING - SCIENCE EGUN AFB %Tt MAR ESTHER * : . . - . - ~ - ~ r W R G H T L A N D F I L L 3 SITE 0296

  20. Installation-restoration program, Phase 2. Confirmation/quantification Stage 1 for Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland. Volume 2. Appendices. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-10-01

    The purpose of this task is to determine if environmental contamination has resulted from waste disposal practices at Otis ANGB MA; to provide estimates of the magnitude and extent of contamination, should contamination be found; to identify potential environmental consequences of migrating pollutants; to identify any additional investigations and their attendant costs necessary to identify the magnitude, extent and direction of movement of discovered contaminants. Partial contents include: well and test pit logs; site safety plan; laboratory analytical methods and quality assurance; and Federal and state drinking water and human health standards applicable in Massachusetts.

Top