NASA Astrophysics Data System (ADS)
Jin, Cheng-Jie; Wang, Wei; Jiang, Rui
2016-08-01
The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.
DOT National Transportation Integrated Search
2005-12-01
This volume provides an overview of the six studies that compose Phase II of the Enhanced Night Visibility project and the experimental plan for its third and final portion, Phase III. The Phase II studies evaluated up to 12 vision enhancement system...
Narayanasamy, Ganesh; Avila, Gabrielle; Mavroidis, Panayiotis; Papanikolaou, Niko; Gutierrez, Alonso; Baacke, Diana; Shi, Zheng; Stathakis, Sotirios
2016-09-01
Prostate cases commonly consist of dual phase planning with a primary plan followed by a boost. Traditionally, the boost phase is planned independently from the primary plan with the risk of generating hot or cold spots in the composite plan. Alternatively, boost phase can be planned taking into account the primary dose. The aim of this study was to compare the composite plans from independently and dependently planned boosts using dosimetric and radiobiological metrics. Ten consecutive prostate patients previously treated at our institution were used to conduct this study on the Raystation™ 4.0 treatment planning system. For each patient, two composite plans were developed: a primary plan with an independently planned boost and a primary plan with a dependently planned boost phase. The primary plan was prescribed to 54 Gy in 30 fractions to the primary planning target volume (PTV1) which includes prostate and seminal vesicles, while the boost phases were prescribed to 24 Gy in 12 fractions to the boost planning target volume (PTV2) that targets only the prostate. PTV coverage, max dose, median dose, target conformity, dose homogeneity, dose to OARs, and probabilities of benefit, injury, and complication-free tumor control (P+) were compared. Statistical significance was tested using either a 2-tailed Student's t-test or Wilcoxon signed-rank test. Dosimetrically, the composite plan with dependent boost phase exhibited smaller hotspots, lower maximum dose to the target without any significant change to normal tissue dose. Radiobiologically, for all but one patient, the percent difference in the P+ values between the two methods was not significant. A large percent difference in P+ value could be attributed to an inferior primary plan. The benefits of considering the dose in primary plan while planning the boost is not significant unless a poor primary plan was achieved.
14 CFR 1216.304 - Major decision points.
Code of Federal Regulations, 2010 CFR
2010-01-01
... technical, economic, and other factors, in the earliest planning. At that stage, the responsible... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have...
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
SU-E-T-436: Accelerated Gated IMRT: A Feasibility Study for Lung Cancer Patients
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilles, M; Boussion, N; Visvikis, D
Purpose: To evaluate the feasibility of delivering a gated Intensity Modulated Radiotherapy (IMRT) treatment using multiple respiratory phases in order to account for all anatomic changes during free breathing and accelerate the gated treatment without increasing the dose per fraction. Methods: For 7 patients with lung cancer, IMRT treatment plans were generated on a full inspiration (FI) Computed Tomography (CT) and a Mid Intensity Position (MIP) CT. Moreover, in order to achieve an accelerated gated IMRT, multiple respiratory phase plans were calculated: 2-phase plans including the FI and the full expiration phases, and 3-phase plans by adding the mid-inspiration phase.more » In order to assess the tolerance limits, plans' doses were registered and summed to the FI-based plan. Mean dose received by Organs at Risk (OARs) and target volumes were used to compare obtained plans. Results: The mean dose differences between the FI plans and the multi-phase plans never exceeded 0.4 Gy (Fig. 1). Concerning the clinical target volume these differences were even smaller: less than 0.1 Gy for both the 2-phase and 3-phase plans. Regarding the MIP treatment plan, higher doses in different healthy structures were observed, with a relative mean increase of 0.4 to 1.5 Gy. Finally, compared to the prescribed dose, the FI as well as the multi-phase plans were associated with a mean difference of 0.4 Gy, whereas in the case of MIP a higher mean difference of 0.6 Gy was observed. Conclusion: The doses obtained while planning a multi-phase gated IMRT treatment were within the tolerance limits. Compared to MIP, a better healthy tissue sparing was observed in the case of treatment planning based on one or multiple phases. Future work will consist in testing the multi-phase treatment delivery while accounting for the multileaf collimator speed constraints.« less
Poster — Thur Eve — 66: Robustness Assessment of a Novel IMRT Planning Method for Lung Radiotherapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahanj, M.; Bissonnette, J.-P.; Heath, E.
2014-08-15
Conventional radiotherapy treatment planning for lung cancer accounts for tumour motion by increasing the beam apertures. We recently developed an IMRT planning strategy which uses reduced beam apertures in combination with an edge enhancing boost of 110% of the prescription dose to the volume that corresponds to the portion of the CTV that moves outside of the reduced beam. Previous results showed that this approach ensures target coverage while reducing lung dose. In the current study, we evaluate the robustness of this boost volume approach to changes in respiratory motion, including amplitude and phase weight variations. ITV and boost volumemore » plans were generated for 5 NSCLC patients with respiratory motion amplitudes ranging from 1 to 2 cm. A standard 5mm PTV margin was used for all plans. The ORBIT treatment planning tool was used to plan and accumulate dose over 10 respiratory phases defined by the 4DCT datasets. For the phase weight variation study, dose was accumulated for three scenarios: equally-weighted-phases, higher weight assigned to exhale phases and higher weight assigned to inhale phases. For the amplitude variation study, a numerical phantom was used to generate 4DCT datasets corresponding to 7 mm, 10 mm and 14 mm motion amplitudes. Preliminary results found that delivered plans for all phase weight scenarios were clinically acceptable. When normalized to mean lung dose, the boost volume plan delivered 5% more dose to the CTV which indicates the potential for dose escalation using this approach.« less
Tug fleet and ground operations schedules and controls. Volume 2: part 1
NASA Technical Reports Server (NTRS)
1975-01-01
This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.
Moses Lake Fishery Restoration Project : FY 1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None given
2000-12-01
The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less
ERIC Educational Resources Information Center
Spybrook, Jessaca; Lininger, Monica; Cullen, Anne
2011-01-01
The purpose of this study is to extend the work of Spybrook and Raudenbush (2009) and examine how the research designs and sample sizes changed from the planning phase to the implementation phase in the first wave of studies funded by IES. The authors examine the impact of the changes in terms of the changes in the precision of the study from the…
1991-03-01
1-2 1.4 CONCLUSIONS AND RECOMMENDATIONS ....................... 1-2 20. PHASE II MANAGEMENT PLAN...2-1 2.1 PROGRAM MANAGEMENT ................................... 2-1 2.2 IM IP TEAM...Barbier, reference Section 2.0 (Phase II Management Plan), is complete and this report provides the results of the Phase II study. 1.2 OBJECTIVES The
Code of Federal Regulations, 2011 CFR
2011-04-01
... Phase 3 plan and protocols and the adequacy of current studies and plans to assess pediatric safety and...) “End-of-Phase 2” meetings and meetings held before submission of a marketing application. At specific... and evaluation process. In particular, FDA has found that meetings at the end of Phase 2 of an...
Route planning with transportation network maps: an eye-tracking study.
Grison, Elise; Gyselinck, Valérie; Burkhardt, Jean-Marie; Wiener, Jan Malte
2017-09-01
Planning routes using transportation network maps is a common task that has received little attention in the literature. Here, we present a novel eye-tracking paradigm to investigate psychological processes and mechanisms involved in such a route planning. In the experiment, participants were first presented with an origin and destination pair before we presented them with fictitious public transportation maps. Their task was to find the connecting route that required the minimum number of transfers. Based on participants' gaze behaviour, each trial was split into two phases: (1) the search for origin and destination phase, i.e., the initial phase of the trial until participants gazed at both origin and destination at least once and (2) the route planning and selection phase. Comparisons of other eye-tracking measures between these phases and the time to complete them, which depended on the complexity of the planning task, suggest that these two phases are indeed distinct and supported by different cognitive processes. For example, participants spent more time attending the centre of the map during the initial search phase, before directing their attention to connecting stations, where transitions between lines were possible. Our results provide novel insights into the psychological processes involved in route planning from maps. The findings are discussed in relation to the current theories of route planning.
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
NASA Technical Reports Server (NTRS)
Johnson, V. T.
1972-01-01
This Phase 2 final report for the B-70 aircraft study contains the data location matrix, which provides a summary of the major cost, schedule, and technical items provided in the report; work breakdown structure; cost definitions; and B-70 program level summary data. The Phase 2 objective was to provide the B-70 aircraft data in accordance with the approved study plan. Several minor modifications to the original plan have been made as the result of the Phase 2 effort.
Impact of Transportation on the Environment and Quality of Life.
ERIC Educational Resources Information Center
Schuster, James J.
This paper discusses the changing role of civil engineers in developed nations. Transportation facilities generally follow a four phase approach before construction: long range systems planning, corridor location study, design location study, and final preparation of plans. Traditional engineering education emphasized the latter two phases but now…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hwang, Ho-Ling; Wilson, Daniel W; Reuscher, Tim
To further examine how factors such as those identified from the Phase I NMT study, and the modeling framework developed under that effort could be applied to local/regional level planning activities, FHWA decided to pursue a Phase II study. It was determined that a small geographic area with more detailed local data would be necessary. Although Washington D.C. was not one of the 2009 NHTS add-ons, it did conduct a household travel survey of 11,000 households in 2007-2008. The National Capital Region Transportation Planning Board at the Metropolitan Washington Council of Governments (MWCOG) conducted the household travel survey. The datamore » coverage under the MWCOG survey is much higher than that of the NHTS. As a part of the Phase II study, a prototype of a Geographic Information System (GIS)-based sketch planning visualization tool was also to be developed. The intent was to use a neighborhood in the Washington D.C. region as a case study for this prototype application.« less
Integrated command, control communication and computation system study
NASA Technical Reports Server (NTRS)
1981-01-01
The study was conducted in three phases: a functional requirements phase; a functional architecture phase; and a design plan phase. The major emphasis was on the functional architecture phase and the approaches used for its functional hierarchy, operations concept, and interfaces.
Yeung, Dannii Y
2013-01-01
The impacts of four types of pre-retirement planning activities (financial, health, social life, and psychological planning) on retirement adjustment were investigated in a sample of Chinese retirees residing in Hong Kong. This study consisted of two phases of data collection, pre-retirement and post-retirement phases. Pre-retirement planning behaviors and psychological health (including attitudes toward retirement, adjustment to retirement, anxiety toward retirement, psychological well-being (PWB), and psychological distress) six months before and after retirement were measured. The final sample consisted of 90 Hong Kong Chinese retirees. Compared with the pre-retirement phase, retirees exhibited more positive attitudes toward retirement and better adjustment after they had actually retired, whereas their level of anxiety and psychological distress remained low over time. Pre-retirement planning was found to be predictive of changes in psychological health, though its impact was not always positive depending on the type of planning activities. In particular, greater psychological planning was associated with positive attitudes toward retirement and better PWB, whereas more social life planning activities were associated with greater psychological distress. In addition to financial and health planning, psychological planning activities should also be prompted to facilitate a smooth adjustment to retirement.
Information System Development: Phase I, Management Planning.
ERIC Educational Resources Information Center
Woods, Bill M.
Objectives of this study of the operations of Engineering Index were to: (1) determine the need for a planning capability, (2) blueprint a mechanism to accomplish planning, and (3) recommend priorities requiring planning attention. Topics considered in the study are planning, the role of the board of directors and trustees, organizational…
Orbit transfer rocket engine technology program. Phase 2: Advanced engine study
NASA Technical Reports Server (NTRS)
Erickson, C.; Martinez, A.; Hines, B.
1987-01-01
In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.
Planning 4D intensity-modulated arc therapy for tumor tracking with a multileaf collimator
NASA Astrophysics Data System (ADS)
Niu, Ying; Betzel, Gregory T.; Yang, Xiaocheng; Gui, Minzhi; Parke, William C.; Yi, Byongyong; Yu, Cedric X.
2017-02-01
This study introduces a practical four-dimensional (4D) planning scheme of IMAT using 4D computed tomography (4D CT) for planning tumor tracking with dynamic multileaf beam collimation. We assume that patients can breathe regularly, i.e. the same way as during 4D CT with an unchanged period and amplitude, and that the start of 4D-IMAT delivery can be synchronized with a designated respiratory phase. Each control point of the IMAT-delivery process can be associated with an image set of 4D CT at a specified respiratory phase. Target is contoured at each respiratory phase without a motion-induced margin. A 3D-IMAT plan is first optimized on a reference-phase image set of 4D CT. Then, based on the projections of the planning target volume in the beam’s eye view at different respiratory phases, a 4D-IMAT plan is generated by transforming the segments of the optimized 3D plan by using a direct aperture deformation method. Compensation for both translational and deformable tumor motion is accomplished, and the smooth delivery of the transformed plan is ensured by forcing connectivity between adjacent angles (control points). It is envisioned that the resultant plans can be delivered accurately using the dose rate regulated tracking method which handles breathing irregularities (Yi et al 2008 Med. Phys. 35 3955-62).This planning process is straightforward and only adds a small step to current clinical 3D planning practice. Our 4D planning scheme was tested on three cases to evaluate dosimetric benefits. The created 4D-IMAT plans showed similar dose distributions as compared with the 3D-IMAT plans on a single static phase, indicating that our method is capable of eliminating the dosimetric effects of breathing induced target motion. Compared to the 3D-IMAT plans with large treatment margins encompassing respiratory motion, our 4D-IMAT plans reduced radiation doses to surrounding normal organs and tissues.
SU-E-T-151: Breathing Synchronized Delivery (BSD) Planning for RapicArc Treatment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lu, W; Chen, M; Jiang, S
2015-06-15
Purpose: To propose a workflow for breathing synchronized delivery (BSD) planning for RapicArc treatment. Methods: The workflow includes three stages: screening/simulation, planning, and delivery. In the screening/simulation stage, a 4D CT with the corresponding breathing pattern is acquired for each of the selected patients, who are able to follow their own breathing pattern. In the planning stage, one breathing phase is chosen as the reference, and contours are delineated on the reference image. Deformation maps to other phases are performed along with contour propagation. Based on the control points of the initial 3D plan for the reference phase and themore » respiration trace, the correlation with respiration phases, the leaf sequence and gantry angles is determined. The beamlet matrices are calculated with the corresponding breathing phase and deformed to the reference phase. Using the 4D dose evaluation tool and the original 3D plan DVHs criteria, the leaf sequence is further optimized to meet the planning objectives and the machine constraints. In the delivery stage, the patients are instructed to follow the programmed breathing patterns of their own, and all other parts are the same as the conventional Rapid-Arc delivery. Results: Our plan analysis is based on comparison of the 3D plan with a static target (SD), 3D plan with motion delivery (MD), and the BSD plan. Cyclic motion of range 0 cm to 3 cm was simulated for phantoms and lung CT. The gain of the BSD plan over MD is significant and concordant for both simulation and lung 4DCT, indicating the benefits of 4D planning. Conclusion: Our study shows that the BSD plan can approach the SD plan quality. However, such BSD scheme relies on the patient being able to follow the same breathing curve that is used in the planning stage during radiation delivery. Funded by Varian Medical Systems.« less
Delphi based consensus study into planning for chemical incidents.
Crawford, I W F; Mackway-Jones, K; Russell, D R; Carley, S D
2004-01-01
To achieve consensus in all phases of chemical incident planning and response. A three round Delphi study was conducted using a panel of 39 experts from specialties involved in the management of chemical incidents. Areas that did not reach consensus in the Delphi study were presented as synopsis statements for discussion in four syndicate groups at a conference hosted by the Department of Health Emergency Planning Co-ordination Unit. A total of 183 of 322 statements had reached consensus upon completion of the Delphi study. This represented 56.8% of the total number of statements. Of these, 148 reached consensus at >94% and 35 reached consensus at >89%. The results of the process are presented as a series of synopsis consensus statements that cover all phases of chemical incident planning and response. The use of a Delphi study and subsequent syndicate group discussions achieved consensus in aspects of all phases of chemical incident planning and response that can be translated into practical guidance for use at regional prehospital and hospital level. Additionally, areas of non-consensus have been identified where further work is required.
Delphi based consensus study into planning for chemical incidents
Crawford, I; Mackway-Jones, K; Russell, D; Carley, S
2004-01-01
Objective: To achieve consensus in all phases of chemical incident planning and response. Design: A three round Delphi study was conducted using a panel of 39 experts from specialties involved in the management of chemical incidents. Areas that did not reach consensus in the Delphi study were presented as synopsis statements for discussion in four syndicate groups at a conference hosted by the Department of Health Emergency Planning Co-ordination Unit. Results: A total of 183 of 322 statements had reached consensus upon completion of the Delphi study. This represented 56.8% of the total number of statements. Of these, 148 reached consensus at >94% and 35 reached consensus at >89%. The results of the process are presented as a series of synopsis consensus statements that cover all phases of chemical incident planning and response. Conclusions: The use of a Delphi study and subsequent syndicate group discussions achieved consensus in aspects of all phases of chemical incident planning and response that can be translated into practical guidance for use at regional prehospital and hospital level. Additionally, areas of non-consensus have been identified where further work is required. PMID:14734369
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheung, Michael L M; Chan, Anthony T C; The Chinese University of Hong Kong
Purpose: To develop a formulation for 4D treatment planning for a tumour tracking volumetric modulated arc therapy treatment (VMAT) plan for lung cancer. Methods: A VMAT plan was optimized based on a reference phase of the 4DCT of a lung cancer patient. The PTV was generated from the GTV of the reference phase. The collimator angle was set to 90 degrees such that the MLC travels along superior-inferior direction which is the main component of movement of a lung tumour. Then, each control point of the VMAT plan was assigned to a particular phase of the 4DCT in chronological order.more » The MLC positions of each control point were shifted according to the position of the tumour centroid of its assigned phase to form a tumour tracking VMAT plan. The control points of the same phase were grouped to form a pseudo VMAT plan for that particular phase. Dose calculation was performed for each pseudo VMAT plan on the corresponding phase of the 4DCT. The CTs of all phases were registered to the reference phase CT according to the displacement of the tumour centroid. The individual dose distributions of the pseudo VMAT plans were summed up and displayed on the reference phase of the 4DCT. A control VMAT plan was optimized based on a PTV generated from the ITV of all phases and compared with the tumour tracking VMAT plan. Results: Both plans achieved >95% volume coverage at the prescription dose level (96% for the tumour tracking plan and 97% for the control plan). But the normal lung volume irradiated at the prescription dose level was 39% less for the tumour tracking plan than the control plan. Conclusion: A formulation of 4D treatment planning for tumour tracking VMAT plans for lung cancer was developed.« less
40 CFR 790.50 - Submission of study plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Submission of study plans. 790.50..., Enforcement, and Modification of Test Rules § 790.50 Submission of study plans. (a) Who must submit study... of a single phase test rule as described in § 790.40(b)(1) must submit study plans for those tests...
40 CFR 790.50 - Submission of study plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 32 2011-07-01 2011-07-01 false Submission of study plans. 790.50..., Enforcement, and Modification of Test Rules § 790.50 Submission of study plans. (a) Who must submit study... of a single phase test rule as described in § 790.40(b)(1) must submit study plans for those tests...
Disentangling self-management goal setting and action planning: A scoping review
Daniëls, Ramon; van Bokhoven, Marloes Amantia; van der Weijden, Trudy; Beurskens, Anna
2017-01-01
Introduction The ongoing rise in the numbers of chronically ill people necessitates efforts for effective self-management. Goal setting and action planning are frequently used, as they are thought to support patients in changing their behavior. However, it remains unclear how goal setting and action planning in the context of self-management are defined in the scientific literature. This study aimed to achieve a better understanding of the various definitions used. Methods A scoping review was conducted, searching PubMed, Cinahl, PsychINFO and Cochrane. Inclusion and exclusion criteria were formulated to ensure the focus on goal setting/action planning and self-management. The literature was updated to December 2015; data selection and charting was done by two reviewers. A qualitative content analysis approach was used. Results Out of 9115 retrieved articles, 58 met the inclusion criteria. We created an overview of goal setting phases that were applied (preparation, formulation of goals, formulation of action plan, coping planning and follow-up). Although the phases we found are in accordance with commonly known frameworks for goal setting, it was striking that the majority of studies (n = 39, 67%) did not include all phases. We also prepared an overview of components and strategies for each goal setting phase. Interestingly, few strategies were found for the communication between patients and professionals about goals/action plans. Most studies (n = 35, 60%) focused goal setting on one single disease and on a predefined lifestyle behavior; nearly half of the articles (n = 27, 47%) reported a theoretical framework. Discussion The results might provide practical support for developers of interventions. Moreover, our results might encourage professionals to become more aware of the phases of the goal setting process and of strategies emphasizing on patient reflection. However, more research might be useful to examine strategies to facilitate communication about goals/action plans. It might also be worthwhile to develop and evaluate goal setting/action planning strategies for people with different and multiple chronic conditions. PMID:29176800
14 CFR 1216.304 - Major decision points.
Code of Federal Regulations, 2011 CFR
2011-01-01
... facility projects, generally have four distinct phases: The conceptual study phase; the detailed planning/definition phase; the development/construction phase; and the operation phase. (Other NASA activities have fewer, less well-defined phases, but can still be characterized by phases representing general or...
Zhao, Jingsong; Mir, Nageen; Ackermann, Nicole; Kaphingst, Kimberly A; Politi, Mary C
2018-06-20
The rate of uninsured people has decreased dramatically since the Affordable Care Act was passed. To make an informed decision, consumers need assistance to understand the advantages and disadvantages of health insurance plans. The Show Me Health Plans Web-based decision support tool was developed to improve the quality of health insurance selection. In response to the promising effectiveness of Show Me Health Plans in a randomized controlled trial (RCT) and the growing need for Web-based health insurance decision support, the study team used expert recommendations for dissemination and implementation, engaged external stakeholders, and made the Show Me Health Plans tool available to the public. The purpose of this study was to implement the public dissemination of the Show Me Health Plans tool in the state of Missouri and to evaluate its impact compared to the RCT. This study used a cross-sectional observational design. Dissemination phase users were compared with users in the RCT study across the same outcome measures. Time spent using the Show Me Health Plans tool, knowledge, importance rating of 9 health insurance features, and intended plan choice match with algorithm predictions were examined. During the dissemination phase (November 2016 to January 2017), 10,180 individuals visited the SMHP website, and the 1069 users who stayed on the tool for more than one second were included in our analyses. Dissemination phase users were more likely to live outside St. Louis City or County (P<.001), were less likely to be below the federal poverty level (P<.001), and had a higher income (P=.03). Overall, Show Me Health Plans users from St. Louis City or County spent more time on the Show Me Health Plans tool than those from other Missouri counties (P=.04); this association was not observed in the RCT. Total time spent on the tool was not correlated with knowledge scores, which were associated with lower poverty levels (P=.009). The users from the RCT phase were more likely to select an insurance plan that matched the tool's recommendations (P<.001) compared with the dissemination phase users. The study suggests that a higher income population may be more likely to seek information and online help when making a health insurance plan decision. We found that Show Me Health Plans users in the dissemination phase were more selective in the information they reviewed. This study illustrates one way of disseminating and implementing an empirically tested Web-based decision aid tool. Distributing Web-based tools is feasible and may attract a large number of potential users, educate them on basic health insurance information, and make recommendations based on personal information and preference. However, using Web-based tools may differ according to the demographics of the general public compared to research study participants. ©Jingsong Zhao, Nageen Mir, Nicole Ackermann, Kimberly A Kaphingst, Mary C Politi. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 20.06.2018.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Long, S; Shang, C; Evans, G
2015-06-15
Purpose: Cyberknife robotic assisted radiation delivery has become a choice for accelerated breast RT, while a slightly increased cardiac dose has been reported. The dose dynamics throughout the respiration cycle has scarcely been explored. This study was designed to investigate the dose changes at each respiratory phase or status during respiration cycle. Methods: Six patients with 4DCT studies and six patients with a pair of free-breathing and deep breath-hold CT sets were used for dosimetry comparisons. 4DCT sets were obtained by Siemens™ CT and its respiratory gating system, comprising of 8 phases. Standard APBI plan at 340 cGy was donemore » per fraction per NSABP B-39/RTOG 0413 and modulated with Cyberknife M6™ on MultiPlan™5.1.2. For the purpose of this study, the tumor volume was outlined in the media-lower quadrant of the left breast. Results: Except for D5cc in plans with 4DCT, cardiac doses are significantly different between respiratory phases in well inhaled breathing phases, and more significantly in plans with BH CT. Mean cardiac doses in 100% inhalation phase were often found to be 5–15% (p< 0.02) less than those in other phases. Conclusion: Although ineligible cardiac doses are noted in APBI plans using 4D free-breathing CT and instantaneous free breathing CT series, a reduction in cardiac dose was seen for the well-inhaled phases. This provides practical guidance for cardiac dose reduction applicable with CK M6 APBR.« less
Use of volumetric-modulated arc therapy for treatment of Hodgkin lymphoma
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Young K., E-mail: Young.Lee@rmh.nhs.uk; Bedford, James L.; Taj, Mary
To evaluate volumetric-modulated arc therapy (VMAT) for treatment of Hodgkin lymphoma (HL) in patients where conventional radiotherapy was not deliverable. A planning computed tomography (CT) scan was acquired for a twelve-year-old boy with Stage IIIB nodular sclerosing HL postchemotherapy with positive positron emission tomography scan. VMAT was used for Phase 1 (19.8 Gy in 11 fractions) and Phase 2 (10.8 Gy in 6 fractions) treatment plans. Single anticlockwise arc plans were constructed using SmartArc (Philips Radiation Oncology Systems, Fitchburg, WI) with control points spaced at 4°. The inverse-planning objectives were to uniformly irradiate the planning target volume (PTV) with themore » prescription dose while keeping the volume of lung receiving greater than 20 Gy (V{sub 20} {sub Gy}) to less than 30% and minimize the dose to the other adjacent organs at risk (OAR). Pretreatment verification was conducted and the treatment delivery was on an MLCi Synergy linear accelerator (Elekta Ltd, Crawley, UK). The planning results were retrospectively confirmed in a further 4 patients using a single PTV with a prescribed dose of 19.8 Gy in 11 fractions. Acceptable dose coverage and homogeneity were achieved for both Phase 1 and 2 plans while keeping the lung V{sub 20} {sub Gy} at 22.5% for the composite plan. The beam-on times for Phase 1 and Phase 2 plans were 109 and 200 seconds, respectively, and the total monitor units were 337.2 MU and 292.5 MU, respectively. The percentage of measured dose points within 3% and 3 mm for Phase 1 and Phase 2 were 92% and 98%, respectively. Both plans were delivered successfully. The retrospective planning study showed that VMAT improved PTV dose uniformity and reduced the irradiated volume of heart and lung, although the volume of lung irradiated to low doses increased. Two-phased VMAT offers an attractive option for large volume sites, such as HL, giving a high level of target coverage and significant OAR sparing together with efficient delivery.« less
Feasibility Study for Low Drag Acoustic Liners Final Report
NASA Technical Reports Server (NTRS)
Riedel, Brian; Wu, Jackie
2017-01-01
This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.
IMMR Phase 1 Prototyping Plan Inputs
NASA Technical Reports Server (NTRS)
Vowell, C. W.; Johnson-Throop, Kathy; Smith, Bryon; Darcy, Jeannette
2006-01-01
This viewgraph presentation reviews the phase I plan of the prototype of the IMMR by the Multilateral Medical Operations Panel (MMOP) Medical Informatics & Technology (MIT) Working Group. It reviews the Purpose of IMMR Prototype Phase 1 (IPP1); the IPP1 Plan Overview, the IMMR Prototype Phase 1 Plan for PDDs and MIC and MIC-DDs, Plan for MICs, a nd the IPP1 objectives
Tan Boon Ann
1987-06-01
The findings of the final phase of a 3-phase multivariate areal analysis study undertaken by the Economic and Social Commission for Asia and the Pacific (ESCAP) in 5 countries of the Asian and Pacific Region, including Malaysia, to examine the impact of family planning programs on fertility and reproduction are reported. The study used Malaysia's administrative district as the unit of analysis because the administration and implementation of socioeconomic development activities, as well as the family planning program, depend to a large extent on the decisions of local organizations at the district or state level. In phase 1, existing program and nonprogram data were analyzed using the multivariate technique to separate the impact of the family planning program net of other developmental efforts. The methodology in the 2nd phase consisted of in-depth investigation of selected areas in order to discern the dynamics and determinants of efficiency. The insights gained in phase 2 regarding dynamics of performance were used in phase 3 to refine the input variables of the phase 1 model. Thereafter, the phase 1 analysis was repeated. Insignificant variables and factors were trimmed in order to present a simplified model for studying the impact of environmental, socioeconomic development, family planning programs, and related factors on fertility. The inclusion of a set of family planning program and development variables in phase 3 increased the predictive power of the impact model. THe explained variance for total fertility rate (TFR) of women under 30 years increased from 71% in phase 1 to 79%. It also raised the explained variance of the efficiency model from 34% to 70%. For women age 30 years and older, their TFR was affected directly by the ethnic composition variable (.76), secondary educational status (-.45), and modern nonagricultural occupation (.42), among others. When controlled for other socioeconomic development and environmental indicators, the nonagricultural activities had a positive direct effect on TFR. No direct effects were found to come from other socioeconomic development indicators, once these factors were controlled. The 3 factors that had direct effects on the fertility of women below age 30 were ethnic composition (.33), contraceptive pevalence (-.32), and secondary educational status (-.25). Other family planning program variables (contraceptive knowledge) and socioeconomic development indicators (exposure to modernization as measured by television ownership and health/living conditions as measured by infant mortality rate) affected fertility significantly but indirectly.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xu, Z; Wang, I; Yao, R
Purpose: This study is to use plan parameters optimization (Dose rate, collimator angle, couch angle, initial starting phase) to improve the performance of conformal arc radiotherapy plans with motion tracking by increasing the plan performance score (PPS). Methods: Two types of 3D conformal arc plans were created based on QUASAR respiratory motion phantom with spherical and cylindrical targets. Sinusoidal model was applied to the MLC leaves to generate motion tracking plans. A MATLAB program was developed to calculate PPS of each plan (ranges from 0–1) and optimize plan parameters. We first selected the dose rate for motion tracking plans andmore » then used simulated annealing algorithm to search for the combination of the other parameters that resulted in the plan of the maximal PPS. The optimized motion tracking plan was delivered by Varian Truebeam Linac. In-room cameras and stopwatch were used for starting phase selection and synchronization between phantom motion and plan delivery. Gaf-EBT2 dosimetry films were used to measure the dose delivered to the target in QUASAR phantom. Dose profiles and Truebeam trajectory log files were used for plan delivery performance evaluation. Results: For spherical target, the maximal PPS (PPSsph) of the optimized plan was 0.79: (Dose rate: 500MU/min, Collimator: 90°, Couch: +10°, starting phase: 0.83π). For cylindrical target, the maximal PPScyl was 0.75 (Dose rate: 300MU/min, Collimator: 87°, starting phase: 0.97π) with couch at 0°. Differences of dose profiles between motion tracking plans (with the maximal and the minimal PPS) and 3D conformal plans were as follows: PPSsph=0.79: %ΔFWHM: 8.9%, %Dmax: 3.1%; PPSsph=0.52: %ΔFWHM: 10.4%, %Dmax: 6.1%. PPScyl=0.75: %ΔFWHM: 4.7%, %Dmax: 3.6%; PPScyl=0.42: %ΔFWHM: 12.5%, %Dmax: 9.6%. Conclusion: By achieving high plan performance score through parameters optimization, we can improve target dose conformity of motion tracking plan by decreasing total MLC leaf travel distance and leaf speed.« less
Phase IV of Early Restoration | NOAA Gulf Spill Restoration
Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB
Early Restoration | NOAA Gulf Spill Restoration
Early Restoration Plan. On April 20, 2011 we reached an agreement with BP to start restoration planning draft plan for the third phase of early restoration in December 2013. We are considering your comments : All Phase III information and documents Phase II Useful Links: Phase II Early Restoration Plan &
ITS strategic deployment plan : executive summary
DOT National Transportation Integrated Search
1997-02-27
The Salt Lake Valley ITS Early Deployment Planning Study-Phase II prepared the framework to deploy candidate Intelligent Transportation System (ITS) projects that address Salt Lake Valleys transportation needs. A planning process was used that inc...
ERIC Educational Resources Information Center
Ruhlman, Paul L., Jr.
2014-01-01
This study's purpose was to describe appreciative inquiry (AI) as an approach to strategic planning for special education in a public school. The study investigated four research questions. How do plans for special education emerge as participants engage in the four phases of AI during strategic planning for the future of special education in a…
2018-01-12
outcomes. This study included three phases: knowledge elicitation, establishment of rule-based, logic requirements, and the development of the POC iOS ...establish the logic needed for a mobile app prior to programming for iOS platforms. The study team selected Microsoft Excel because it enabled the...distribution of these plans would streamline the plan development process. Thus, as a proof-of-concept, the study team conducted a multi-phased effort
Logistics planning for phased programs.
NASA Technical Reports Server (NTRS)
Cook, W. H.
1973-01-01
It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.
Feasibility study for early removal of HEU from CPP-651-Phase II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, C.V.; Henry, R.; Milligan, C.
1997-09-01
A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology andmore » the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.« less
Solar power satellite system definition study, phase 2.
NASA Technical Reports Server (NTRS)
1979-01-01
A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.
Phase V of Early Restoration | NOAA Gulf Spill Restoration
Phase V Early Restoration Plan and Environmental Assessment. The project will acquire land along Florida million. Phase V Early Restoration Plan and Environmental Assessment (pdf, 10 MB) Draft Phase V Early Restoration Plan and Environmental Assessment (Executive Summary) (2 MB) Phase V Fact Sheet (pdf, 2 MB) Gulf
25 CFR 1000.19 - What is done during the “planning phase”?
Code of Federal Regulations, 2010 CFR
2010-04-01
....19 What is done during the “planning phase”? The Act requires that all Tribes/Consortia seeking to participate in Tribal self-governance complete a planning phase. During the planning phase, the Tribe... 25 Indians 2 2010-04-01 2010-04-01 false What is done during the âplanning phaseâ? 1000.19 Section...
Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez
2007-02-01
In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.
Two-phase computerized planning of cryosurgery using bubble-packing and force-field analogy.
Tanaka, Daigo; Shimada, Kenji; Rabin, Yoed
2006-02-01
Cryosurgery is the destruction of undesired tissues by freezing, as in prostate cryosurgery, for example. Minimally invasive cryosurgery is currently performed by means of an array of cryoprobes, each in the shape of a long hypodermic needle. The optimal arrangement of the cryoprobes, which is known to have a dramatic effect on the quality of the cryoprocedure, remains an art held by the cryosurgeon, based on the cryosurgeon's experience and "rules of thumb." An automated computerized technique for cryosurgery planning is the subject matter of the current paper, in an effort to improve the quality of cryosurgery. A two-phase optimization method is proposed for this purpose, based on two previous and independent developments by this research team. Phase I is based on a bubble-packing method, previously used as an efficient method for finite element meshing. Phase II is based on a force-field analogy method, which has proven to be robust at the expense of a typically long runtime. As a proof-of-concept, results are demonstrated on a two-dimensional case of a prostate cross section. The major contribution of this study is to affirm that in many instances cryosurgery planning can be performed without extremely expensive simulations of bioheat transfer, achieved in Phase I. This new method of planning has proven to reduce planning runtime from hours to minutes, making automated planning practical in a clinical time frame.
NASA Technical Reports Server (NTRS)
1977-01-01
The primary function of the implementation phase is to convert the ERA design of the design study phase into deliverable flight hardware. The development aspects of the experiment logic unit, the dual power converter, the junction box and the cables are considered.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
The Quality Assurance/Quality Control (QA/QC) Program for Phase 2 of the Clinch River Remedial Investigation (CRRI) was designed to comply with both Department of Energy (DOE) Order 5700.6C and Environmental Protection Agency (EPA) QAMS-005/80 (EPA 1980a) guidelines. QA requirements and the general QA objectives for Phase 2 data were defined in the Phase 2 Sampling and Analysis Plan (SAP)-Quality Assurance Project Plan, and scope changes noted in the Phase 2 Sampling and Analysis Plan Addendum. The QA objectives for Phase 2 data were the following: (1) Scientific data generated will withstand scientific and legal scrutiny. (2) Data will be gatheredmore » using appropriate procedures for sample collection, sample handling and security, chain of custody (COC), laboratory analyses, and data reporting. (3) Data will be of known precision and accuracy. (4) Data will meet data quality objectives (DQOs) defined in the Phase 2 SAP.« less
ERIC Educational Resources Information Center
Knowlden, Adam P.; Sharma, Manoj; Bernard, Amy L.
2012-01-01
The purpose of this study was to operationalize the constructs of the Theory of Planned Behavior (TPB) to predict the sleep intentions and behaviors of undergraduate college students attending a Midwestern University. Data collection spanned three phases. The first phase included a semi-structured qualitative interview (n = 11), readability by…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.A.
1983-05-01
This report describes Phase I of a study of the fouling of condensing heat exchangers in residential oil-fired boiler and furnaces. The first phase consists of a review of available information on soot information in residential systems and the preparation of a work plan for Phase II. In the literature review the effects of burner type, startup and shutdown, time from tuning, fuel quality, combustion chambers, nozzles, and fuel additives are discussed. While data are available on soot emissions with current burners and fuels there are limited data available on advanced burners and degraded fuels with modern burners. The Phasemore » II work will provide an evaluation of the need for the development of advanced burner concepts for oil-fired condensing systems. Planned experimental work includes a furnace draft optimization study, extended fouling tests, a blue flame/yellow flame comparative test, and some degraded fuel teste.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... to this initial phase of developing the general management plan/wilderness study/environmental impact... DEPARTMENT OF THE INTERIOR National Park Service Notice of Intent to Prepare an Environmental Impact Statement for a General Management Plan Amendment/Wilderness Study, for Gates of the Arctic...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, J; Ding, X; Liang, J
2016-06-15
Purpose: With energy repainting in lung IMPT, the dose delivered is approximate to the convolution of dose in each phase with corresponding breathing PDF. This study is to compute breathing PDF weighted 4D dose in lung IMPT treatment and compare to its initial robust plan. Methods: Six lung patients were evaluated in this study. Amsterdam shroud image were generated from pre-treatment 4D cone-beam projections. Diaphragm motion curve was extract from the shroud image and the breathing PDF was generated. Each patient was planned to 60 Gy (12GyX5). In initial plans, ITV density on average CT was overridden with its maximummore » value for planning, using two IMPT beams with robust optimization (5mm uncertainty in patient position and 3.5% range uncertainty). The plan was applied to all 4D CT phases. The dose in each phase was deformed to a reference phase. 4D dose is reconstructed by summing all these doses based on corresponding weighting from the PDF. Plan parameters, including maximum dose (Dmax), ITV V100, homogeneity index (HI=D2/D98), R50 (50%IDL/ITV), and the lung-GTV’s V12.5 and V5 were compared between the reconstructed 4D dose to initial plans. Results: The Dmax is significantly less dose in the reconstructed 4D dose, 68.12±3.5Gy, vs. 70.1±4.3Gy in the initial plans (p=0.015). No significant difference is found for the ITV V100, HI, and R50, 92.2%±15.4% vs. 96.3%±2.5% (p=0.565), 1.033±0.016 vs. 1.038±0.017 (p=0.548), 19.2±12.1 vs. 18.1±11.6 (p=0.265), for the 4D dose and initial plans, respectively. The lung-GTV V12.5 and V5 are significantly high in the 4D dose, 13.9%±4.8% vs. 13.0%±4.6% (p=0.021) and 17.6%±5.4% vs. 16.9%±5.2% (p=0.011), respectively. Conclusion: 4D dose reconstruction based on phase PDF can be used to evaluate the dose received by the patient. A robust optimization based on the phase PDF may even further improve patient care.« less
Planning for Office Automation.
ERIC Educational Resources Information Center
Mick, Colin K.
1983-01-01
Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)
Planning Targets for Phase II Watershed Implementation Plans
On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.
NASA Technical Reports Server (NTRS)
Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.
1975-01-01
A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.
Space shuttle phase B study plan
NASA Technical Reports Server (NTRS)
Hello, B.
1971-01-01
Phase B emphasis was directed toward development of data which would facilitate selection of the booster concept, and main propulsion system for the orbiter. A shuttle system is also defined which will form the baseline for Phase C program activities.
78 FR 5165 - First Phase of the Forest Planning Process for the Bio-Region
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-24
... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio... initiating the first phase of the forest planning process for the Bio-Region. SUMMARY: Come gather 'round... phase of the Bio-Regional Assessment has begun. DATES: The Bio-Regional Assessment Report will be...
O'Shanahan Juan, José Joaquín; Hernández Rodríguez, Miguel Ángel; Del Otero Sanz, Laura; Henríquez Suárez, José Andrés; Mahtani Chugani, Vinita
The need for new approaches to strategic planning by incorporating the perspectives of professionals and inhabitants has led to a new model for the 3rd Canary Islands (Spain) Health Plan (IIIPSC). A dual-phase participatory process using qualitative techniques is proposed: 1) local phase: a quantitative and qualitative study based on training and a research-action-participation initiative; and 2) insular phase: health conferences with face-to-face discussion of results in each health area (island) and proposals for action. The process prioritises problems and establishes a specific action plan for each island through initiatives that are considered to be viable, grouped by themes and weighted according to the potential impact on priority problems. This process of interaction may help to guide planning model changes and health policy decision-making, and was included in the IIIPSC Project for its parliamentary procedure. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.
NASA Technical Reports Server (NTRS)
1976-01-01
The results are presented of the AMPS Phase C/D (Design, Development, and Operations) program analysis and planning effort. Cost and schedule estimates are included. Although the AMPS program has been specifically addressed, these task descriptions are basically adaptable to a broader-based program incorporating additional or different Spacelab/orbiter payloads.
Using a concept map as a tool for strategic planning: The Healthy Brain Initiative.
Anderson, Lynda A; Day, Kristine L; Vandenberg, Anna E
2011-09-01
Concept mapping is a tool to assist in strategic planning that allows planners to work through a sequence of phases to produce a conceptual framework. Although several studies describe how concept mapping is applied to various public health problems, the flexibility of the methods used in each phase of the process is often overlooked. If practitioners were more aware of the flexibility, more public health endeavors could benefit from using concept mapping as a tool for strategic planning. The objective of this article is to describe how the 6 concept-mapping phases originally outlined by William Trochim guided our strategic planning process and how we adjusted the specific methods in the first 2 phases to meet the specialized needs and requirements to create The Healthy Brain Initiative: A National Public Health Road Map to Maintaining Cognitive Health. In the first stage (phases 1 and 2 of concept mapping), we formed a steering committee, convened 4 work groups over a period of 3 months, and generated an initial set of 42 action items grounded in science. In the second stage (phases 3 and 4), we engaged stakeholders in sorting and rating the action items and constructed a series of concept maps. In the third and final stage (phases 5 and 6), we examined and refined the action items and generated a final concept map consisting of 44 action items. We then selected the top 10 action items, and in 2007, we published The Healthy Brain Initiative: A National Public Health Road Map to Maintaining Cognitive Health, which represents the strategic plan for The Healthy Brain Initiative.
Two-phase Computerized Planning of Cryosurgery Using Bubble-packing and Force-field Analogy
Tanaka, Daigo; Shimada, Kenji; Rabin, Yoed
2007-01-01
Background: Cryosurgery is the destruction of undesired tissues by freezing, as in prostate cryosurgery, for example. Minimally-invasive cryosurgery is currently performed by means of an array of cryoprobes, each in the shape of a long hypodermic needle. The optimal arrangement of the cryoprobes, which is known to have a dramatic effect on the quality of the cryoprocedure, remains an art held by the cryosurgeon, based on the cryosurgeon's experience and “rules of thumb.” An automated computerized technique for cryosurgery planning is the subject matter of the current report, in an effort to improve the quality of cryosurgery. Method of Approach: A two-phase optimization method is proposed for this purpose, based on two previous and independent developments by this research team. Phase I is based on a bubble-packing method, previously used as an efficient method for finite elements meshing. Phase II is based on a force-field analogy method, which has proven to be robust at the expense of a typically long runtime. Results: As a proof-of-concept, results are demonstrated on a 2D case of a prostate cross-section. The major contribution of this study is to affirm that in many instances cryosurgery planning can be performed without extremely expensive simulations of bioheat transfer, achieved in Phase I. Conclusions: This new method of planning has proven to reduce planning runtime from hours to minutes, making automated planning practical in a clinical time frame. PMID:16532617
Space station WP-04 power system. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hallinan, G. J.
1987-01-01
Major study activities and results of the phase B study contract for the preliminary design of the space station Electrical Power System (EPS) are summarized. The areas addressed include the general system design, man-tended option, automation and robotics, evolutionary growth, software development environment, advanced development, customer accommodations, operations planning, product assurance, and design and development phase planning. The EPS consists of a combination photovoltaic and solar dynamic power generation subsystem and a power management and distribution (PMAD) subsystem. System trade studies and costing activities are also summarized.
North Dakota Statewide Nursing Study, Phase III. Final Report and Recommendations.
ERIC Educational Resources Information Center
Clark, Neil; Smith, David
The process, outcomes, and recommendations resulting from a project to develop a statewide nursing resource planning system are examined. Phase 1 of the project investigated nursing manpower demands for 1984 and 1986, while phase 2 studied the current scope of nursing practice. In addition to summarizing the findings of these investigations,…
Communications Contingency Plan: Planning for Crises and Controversy. Phase 1
NASA Technical Reports Server (NTRS)
Treise, Deborah; Bernstein, Arla G.; Yates, Brad
1998-01-01
Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.
Operations planning and analysis handbook for NASA/MSFC phase B development projects
NASA Technical Reports Server (NTRS)
Batson, Robert C.
1986-01-01
Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.
Problem solving of student with visual impairment related to mathematical literacy problem
NASA Astrophysics Data System (ADS)
Pratama, A. R.; Saputro, D. R. S.; Riyadi
2018-04-01
The student with visual impairment, total blind category depends on the sense of touch and hearing in obtaining information. In fact, the two senses can receive information less than 20%. Thus, students with visual impairment of the total blind categories in the learning process must have difficulty, including learning mathematics. This study aims to describe the problem-solving process of the student with visual impairment, total blind category on mathematical literacy issues based on Polya phase. This research using test method similar problems mathematical literacy in PISA and in-depth interviews. The subject of this study was a student with visual impairment, total blind category. Based on the result of the research, problem-solving related to mathematical literacy based on Polya phase is quite good. In the phase of understanding the problem, the student read about twice by brushing the text and assisted with information through hearing three times. The student with visual impairment in problem-solving based on the Polya phase, devising a plan by summoning knowledge and experience gained previously. At the phase of carrying out the plan, students with visual impairment implement the plan in accordance with pre-made. In the looking back phase, students with visual impairment need to check the answers three times but have not been able to find a way.
An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.
Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi
2017-01-01
To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.
Venkataramani, PrasannaVenkhatesh; Gopal, Atul; Murthy, Aditya
2018-03-01
Although race models have been extensively used to study inhibitory control, the mechanisms that enable change of reach plans in the context of race models remain unexplored. We used a redirect task in which targets occasionally changed their locations to study the control of reaching movements during movement planning and execution phases. We tested nine different race model architectures that could explain the redirect behavior of reaching movements. We show that an independent GO-STOP-GO model that reflects a plan-abort-re-plan strategy involving non-interacting elements successfully explained the various behavioral measures such as the compensation function and the pattern of error response reaction times. By extending the same race model to the execution phase, we could explain the extent and the pattern of hypometric trials. Interestingly, the race model also provided evidence that redirecting a movement during planning and execution shared the same inhibitory mechanism. Taken together, this study demonstrates the applicability of an independent race model to understand the computational mechanisms underlying the control of reach movements. © 2018 Federation of European Neuroscience Societies and John Wiley & Sons Ltd.
Additional EIPC Study Analysis: Interim Report on High Priority Topics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadley, Stanton W
Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations weremore » developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 13 topics was developed for further analysis; this paper discusses the first five.« less
ERIC Educational Resources Information Center
Spybrook, Jessaca; Puente, Anne Cullen; Lininger, Monica
2013-01-01
This article examines changes in the research design, sample size, and precision between the planning phase and implementation phase of group randomized trials (GRTs) funded by the Institute of Education Sciences. Thirty-eight GRTs funded between 2002 and 2006 were examined. Three studies revealed changes in the experimental design. Ten studies…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Devereux, Thomas, E-mail: thomas.devereux@petermac.org; Pham, Daniel; Kron, Tomas
2015-04-01
This is a planning study investigating the dosimetric advantages of gated volumetric-modulated arc therapy (VMAT) to the end-exhale and end-inhale breathing phases for patients undergoing stereotactic treatment of primary renal cell carcinoma. VMAT plans were developed from the end-inhale (VMATinh) and the end-exhale (VMATexh) phases of the breathing cycle as well as a VMAT plan and 3-dimensional conformal radiation therapy plan based on an internal target volume (ITV) (VMATitv). An additional VMAT plan was created by giving the respective gated VMAT plan a 50% weighting and summing the inhale and exhale plans together to create a summed gated plan. Dosemore » to organs at risk (OARs) as well as comparison of intermediate and low-dose conformity was evaluated. There was no difference in the volume of healthy tissue receiving the prescribed dose for the planned target volume (PTV) (CI100%) for all the VMAT plans; however, the mean volume of healthy tissue receiving 50% of the prescribed dose for the PTV (CI50%) values were 4.7 (± 0.2), 4.6 (± 0.2), and 4.7 (± 0.6) for the VMATitv, VMATinh, and VMATexh plans, respectively. The VMAT plans based on the exhale and inhale breathing phases showed a 4.8% and 2.4% reduction in dose to 30 cm{sup 3} of the small bowel, respectively, compared with that of the ITV-based VMAT plan. The summed gated VMAT plans showed a 6.2% reduction in dose to 30 cm{sup 3} of the small bowel compared with that of the VMAT plans based on the ITV. Additionally, when compared with the inhale and the exhale VMAT plans, a 4% and 1.5%, respectively, reduction was observed. Gating VMAT was able to reduce the amount of prescribed, intermediate, and integral dose to healthy tissue when compared with VMAT plans based on an ITV. When summing the inhale and exhale plans together, dose to healthy tissue and OARs was optimized. However, gating VMAT plans would take longer to treat and is a factor that needs to be considered.« less
ERIC Educational Resources Information Center
Leverett, Avis
2016-01-01
This study investigated the motivation to teach and planned persistence of pre-service teachers during two phases of their student teaching experience by using a mixed methods study design. The quantitative design sought to evaluate if the motivation and planned persistence of pre-service teachers changed during the course of the supervised…
NASA Astrophysics Data System (ADS)
Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Bale, S.; Carter, T.; Crocker, N.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.; Chen, Y.; Cutler, R.; Fox, W.; Heitzenroeder, P.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.
2015-11-01
Various regimes or ``phases'' are identified in a magnetic reconnection ``phase diagram'' which classifies different coupling mechanisms from the global system scales to the local dissipation scales. The FLARE device (http://flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton to provide access to all of these phases directly relevant to space, solar, astrophysical, and fusion plasmas. Study of plasma energization during magnetic reconnection is one of major topics for the FLARE facility, which is planned to be a user facility. The motivating major physics questions regarding plasma energization and the planned collaborative research on these topics will be presented and discussed. Supported by NSF.
23 CFR 450.224 - Phase-in of new requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...
23 CFR 450.338 - Phase-in of new requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...
23 CFR 450.224 - Phase-in of new requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...
23 CFR 450.338 - Phase-in of new requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...
23 CFR 450.224 - Phase-in of new requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...
23 CFR 450.338 - Phase-in of new requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...
23 CFR 450.338 - Phase-in of new requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Phase-in of new requirements. 450.338 Section 450.338 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.338 Phase-in of new...
23 CFR 450.224 - Phase-in of new requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Phase-in of new requirements. 450.224 Section 450.224 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.224 Phase-in of new...
Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2
NASA Technical Reports Server (NTRS)
Perkey, John K.
1992-01-01
The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.
NASA Technical Reports Server (NTRS)
Keeley, J. T.
1976-01-01
Typical missions identified for AMPS flights in the arly 1980's are described. Experiment objectives and typical scientific instruments selected to accomplish these objectives are discussed along with mission requirements and shuttle and Spacelab capabilities assessed to determine any AMPS unique requirements. Preliminary design concepts for the first two AMPS flights form the basis for the Phase C/D program plan. This plan implements flights 1 and 2 and indicates how both the scientific and flight support hardware can be systematically evolved for future AMPS flights.
Multiple anatomy optimization of accumulated dose
DOE Office of Scientific and Technical Information (OSTI.GOV)
Watkins, W. Tyler, E-mail: watkinswt@virginia.edu; Siebers, Jeffrey V.; Moore, Joseph A.
Purpose: To investigate the potential advantages of multiple anatomy optimization (MAO) for lung cancer radiation therapy compared to the internal target volume (ITV) approach. Methods: MAO aims to optimize a single fluence to be delivered under free-breathing conditions such that the accumulated dose meets the plan objectives, where accumulated dose is defined as the sum of deformably mapped doses computed on each phase of a single four dimensional computed tomography (4DCT) dataset. Phantom and patient simulation studies were carried out to investigate potential advantages of MAO compared to ITV planning. Through simulated delivery of the ITV- and MAO-plans, target dosemore » variations were also investigated. Results: By optimizing the accumulated dose, MAO shows the potential to ensure dose to the moving target meets plan objectives while simultaneously reducing dose to organs at risk (OARs) compared with ITV planning. While consistently superior to the ITV approach, MAO resulted in equivalent OAR dosimetry at planning objective dose levels to within 2% volume in 14/30 plans and to within 3% volume in 19/30 plans for each lung V20, esophagus V25, and heart V30. Despite large variations in per-fraction respiratory phase weights in simulated deliveries at high dose rates (e.g., treating 4/10 phases during single fraction beams) the cumulative clinical target volume (CTV) dose after 30 fractions and per-fraction dose were constant independent of planning technique. In one case considered, however, per-phase CTV dose varied from 74% to 117% of prescription implying the level of ITV-dose heterogeneity may not be appropriate with conventional, free-breathing delivery. Conclusions: MAO incorporates 4DCT information in an optimized dose distribution and can achieve a superior plan in terms of accumulated dose to the moving target and OAR sparing compared to ITV-plans. An appropriate level of dose heterogeneity in MAO plans must be further investigated.« less
A key to success: optimizing the planning process
NASA Astrophysics Data System (ADS)
Turk, Huseyin; Karakaya, Kamil
2014-05-01
By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air operation planning process is analyzed according to a comprehensive approach. The difficulties of planning are identified. Consequently, for optimizing a decisionmaking process of an air operation, a planning process is identified in a virtual command and control structure.
PLANNING STUDY TO MODEL AND MONITOR COAL PILE RUNOFF. PHASE I
The report describes a planning study for predicting and monitoring the hydrologic and chemical characteristics of effluent streams resulting from precipitation impacting on open storage of coal. It includes: a survey of utilities on storage habits and treatment systems for coal ...
NASA Astrophysics Data System (ADS)
Purwaningsih, E.; Sutoyo, S.; Wasis; Prahani, B. K.
2018-03-01
This research is aimed to analyse the effectiveness of ComCoReLS (Concept Mapping Content Representation Lesson Study) model towards the improvement skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher. This research used one group pre-test and post-test design on 12 pre-service physics teacher at University of Malang State (Indonesia) in academic year 2016/2017. Data collection was conducted through test and interview. Skills of creating physics lesson plan for pre-service physics teacher measurement were conducted through Physics Lesson Plan Evaluation Sheet (PLPES). The data analysis technique was done by using paired t-test and n-gain. The CoMCoReLS model consists of 5 phases, including (1) Preparation, (2) Coaching, (3) Guided Practice, (4) Independent Practice, and (5) Evaluation. In the first, second, third and fifth phases are done at University of Malang State, while the fourth phase (Independent Practice) is done in SMAN 1 Singosari, SMAN 2 Malang, SMA Lab UM, MAN 3 Malang. The results showed that there was a significant increase in skills of creating physics lesson plan for pre-service physics teacher at α = 5% and n-gain average of high category. Thus, the ComCoReLS model is effective for improving skills of creating physics lesson plan for pre-service physics teacher.
40 CFR 72.43 - Phase I reduced utilization plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.43 Phase I reduced... any Acid Rain emissions limitation or emissions reduction requirements during Phase I; and (ii) Meets... this section shall include in the Acid Rain permit application for the unit a reduced utilization plan...
40 CFR 72.43 - Phase I reduced utilization plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.43 Phase I reduced... any Acid Rain emissions limitation or emissions reduction requirements during Phase I; and (ii) Meets... this section shall include in the Acid Rain permit application for the unit a reduced utilization plan...
40 CFR 72.43 - Phase I reduced utilization plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.43 Phase I reduced... any Acid Rain emissions limitation or emissions reduction requirements during Phase I; and (ii) Meets... this section shall include in the Acid Rain permit application for the unit a reduced utilization plan...
40 CFR 72.43 - Phase I reduced utilization plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.43 Phase I reduced... any Acid Rain emissions limitation or emissions reduction requirements during Phase I; and (ii) Meets... this section shall include in the Acid Rain permit application for the unit a reduced utilization plan...
40 CFR 72.43 - Phase I reduced utilization plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.43 Phase I reduced... any Acid Rain emissions limitation or emissions reduction requirements during Phase I; and (ii) Meets... this section shall include in the Acid Rain permit application for the unit a reduced utilization plan...
78 FR 8104 - First Phase of the Forest Planning Process for the Bio-Region; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-05
... DEPARTMENT OF AGRICULTURE Forest Service First Phase of the Forest Planning Process for the Bio-Region; Correction AGENCY: USDA, Forest Service. ACTION: Notice; correction. SUMMARY: The Department of... rule entitled First Phase of the Forest Planning Process for the Bio-Region. The document contained...
Planning, Zoning, & the Consistency Doctrine: The Florida Experience
DOT National Transportation Integrated Search
1995-10-01
State Transportation Policy Initiative (STPI)is multi-phase study to examine : current transportation planning, growth management, and transportation funding : practices in Florida and to develop recommendations that can be the basis of : future legi...
An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals
Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi
2017-01-01
Objectives: To assess the implementation and evaluation phases of strategic plans in selected hospitals. Methods: We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Results: Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital’s priorities was the most important advantage of a strategic plan. Conclusion: There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning. PMID:29085637
Fort Benning Land-Use Planning and Management Study
1990-04-01
process is three-tiered: (a) an initial phase that results in preliminary allocations for natural resources, (b) a second phase that focuses on...allocations of military training requirements, and (c) a final phase that resolves conflicts between the military and natural resource requirements and...assigns final allocations. 34. Initial phase : Natural resource allocations. The first step in this phase was to make allocations among natural resource
Sequential Sampling Plan of Anthonomus grandis (Coleoptera: Curculionidae) in Cotton Plants.
Grigolli, J F J; Souza, L A; Mota, T A; Fernandes, M G; Busoli, A C
2017-04-01
The boll weevil, Anthonomus grandis grandis Boheman (Coleoptera: Curculionidae), is one of the most important pests of cotton production worldwide. The objective of this work was to develop a sequential sampling plan for the boll weevil. The studies were conducted in Maracaju, MS, Brazil, in two seasons with cotton cultivar FM 993. A 10,000-m2 area of cotton was subdivided into 100 of 10- by 10-m plots, and five plants per plot were evaluated weekly, recording the number of squares with feeding + oviposition punctures of A. grandis in each plant. A sequential sampling plan by the maximum likelihood ratio test was developed, using a 10% threshold level of squares attacked. A 5% security level was adopted for the elaboration of the sequential sampling plan. The type I and type II error used was 0.05, recommended for studies with insects. The adjustment of the frequency distributions used were divided into two phases, so that the model that best fit to the data was the negative binomial distribution up to 85 DAE (Phase I), and from there the best fit was Poisson distribution (Phase II). The equations that define the decision-making for Phase I are S0 = -5.1743 + 0.5730N and S1 = 5.1743 + 0.5730N, and for the Phase II are S0 = -4.2479 + 0.5771N and S1 = 4.2479 + 0.5771N. The sequential sampling plan developed indicated the maximum number of sample units expected for decision-making is ∼39 and 31 samples for Phases I and II, respectively. © The Authors 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
SU-F-J-99: Dose Accumulation and Evaluation in Lung SBRT Among All Phases of Respiration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Azcona, JD; Barbes, B; Aristu, J
Purpose: To calculate the total planning dose on lung tumors (GTV) by accumulating the dose received in all respiration phases. Methods: A patient 4D planning CT (phase-binned, from a Siemens Somatom CT) was used to locate the GTV of a lung tumor in all respiratory phases with Pinnacle (v9.10). GTV contours defined in all phases were projected to the reference phase, where the ITV was defined. Centroids were calculated for all the GTV projections. No deformation or rotation was taken into account. The only GTV contour as defined in the reference phase was voxelized to track each voxel individually. Wemore » accumulated the absorbed dose in different phases on each voxel. A 3DCRT and a VMAT plan were designed on the reference phase fulfilling the ITV dosimetric requirements, using the 10MV FFF photon model from an Elekta Versa linac. ITV-to-PTV margins were set to 5mm. In-house developed MATLAB code was used for tumor voxeling and dose accumulation, assuming that the dose distribution planned in the reference phase behaved as a “dose-cloud” during patient breathing. Results: We tested the method on a patient 4DCT set of images exhibiting limited tumor motion (<5mm). For the 3DCRT plan, D95 was calculated for the GTV with motion and for the ITV, showing an agreement of 0.04%. For the VMAT plan, we calculated the D95 for every phase as if the GTV in that phase had received the whole treatment. Differences in D95 for all phases are within 1%, and estimate the potential interplay effect during delivery. Conclusion: A method for dose accumulation and assessment was developed that can compare GTV motion with ITV dosage, and estimate the potential interplay effect for VMAT plans. Work in progress includes the incorporation of deformable image registration and 4D CBCT dose calculation for dose reconstruction and assessment during treatment.« less
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
A Reliability Simulator for Radiation-Hard Microelectronics Development
1991-07-01
1 3.0 PHASE II WORK PLANS ................................................................ 2... plan . The correlation experimental details including the devices utilized, the hot-carrier stressing and the wafer-level radiation correlation procedure...channel devices, and a new lifetime extrapolation method is demonstrated for p-channel devices. 3.0 PHASE II WORK PLANS The Phase 1I program consisted of
Roosevelt-Vanderbilt alternative transportation system planning study : phase 1
DOT National Transportation Integrated Search
2001-08-01
This plan identifies components of a sustainable and effective alternative transportation system that will provide improved access to, and connections among, the Roosevelt-Vanderbilt National Historic Site units. The goal is to reduce the congestion ...
Fluent Persuasive Writing with Counterarguments for Students with Emotional Disturbance
ERIC Educational Resources Information Center
Mastropieri, Margo A.; Scruggs, Thomas E.; Cerar, Nancy Irby; Allen-Bronaugh, Dannette; Thompson, Catherine; Guckert, Mary; Leins, Pat; Hauth, Clara; Cuenca-Sanchez, Yojanna
2014-01-01
Twelve seventh- and eighth-grade students with emotional disturbance participated in a multiple probe, multiple baseline design two-phase intervention study to improve persuasive writing skills. The first phase after baseline taught students to plan and write persuasive essays including counterarguments. In the second phase, students were taught…
Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza
2014-09-28
Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.
Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran
Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza
2015-01-01
Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385
33 CFR 263.19 - Detailed project reports.
Code of Federal Regulations, 2011 CFR
2011-07-01
... report will generally meet the requirements of ER 1110-2-1150, as it pertains to Phase II AE&D studies... that the planning process should be generally considered the same for studies conducted under all... for arriving at the selected plan and recommendations for Federal participation. (c) The level of...
NASA Astrophysics Data System (ADS)
French, N. H. F.; Ottmar, R. D.; Brown, T. J.; Larkin, N. K.
2017-12-01
The Fire and Smoke Model Evaluation Experiment (FASMEE) is an integrative research effort to identify and collect critical measurements to improve operational wildland fire and smoke prediction systems. FASMEE has two active phases and one suggested phase. Phase 1 is the analysis and planning process to assess the current state of fire-plume-smoke modeling and to determine the critical measurements required to evaluate and improve these operational fire and smoke models. As the major deliverable for Phase 1, a study plan has been completed that describes the measurement needs, field campaigns, and command, safety and air space de-confliction plans necessary to complete the FASMEE project. Phase 2 is a set of field campaigns to collect data during 2019-2022. Future Improvements would be a set of analyses and model improvements based on the data collected within Phase 2 that is dependent on identifying future funding sources. In this presentation, we will review the FASMEE Study Plan and detailed measurements and conditions expected for the four to five proposed research burns. The recommended measurements during Phase 2 span the four interrelated disciplines of FASMEE: fuels and consumption, fire behavior and energy, plume dynamics and meteorology, and smoke emissions, chemistry, and transport. Fuel type, condition, and consumption during wildland fire relates to several fire impacts including radiative heating, which provides the energy that drives fire dynamics. Local-scale meteorology is an important factor which relates to atmospheric chemistry, dispersion, and transport. Plume dynamics provide the connection between fire behavior and far-field smoke dispersion, because it determines the vertical distribution of the emissions. Guided by the data needs and science questions generated during Phase 1, three wildland fire campaigns were selected. These included the western wildfire campaign (rapid deployment aimed at western wildfires supporting NOAA, NASA, and NSF smoke flights), southwestern campaign (targeting high intensity prescribed fires), and southeastern campaign (targeting large and higher than average fuel loadings with important smoke management relevancy).
Scenario for concurrent conceptual assembly line design: A case study
NASA Astrophysics Data System (ADS)
Mas, F.; Ríos, J.; Menéndez, J. L.
2012-04-01
The decision to design and build a new aircraft is preceded by years of research and study. Different disciplines work together throughout the lifecycle to ensure not only a complete functional definition of the product, but also a complete industrialization, a marketing plan, a maintenance plan, etc. This case study focuses on the conceptual design phase. During this phase, the design solutions that will meet the functional and industrial requirements are defined, i.e.: the basic requirements of industrialization. During this phase, several alternatives are studied, and the most attractive in terms of performance and cost requirements is selected. As a result of the study of these alternatives, it is possible to define an early conceptual design of the assembly line and its basic parameters. The plant needs, long cycle jigs & tools or industrial means and human resources with the necessary skills can be determined in advance.
TH-AB-202-03: A Novel Tool for Computing Deliverable Doses in Dynamic MLC Tracking Treatments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fast, M; Kamerling, C; Menten, M
2016-06-15
Purpose: In tracked dynamic multi-leaf collimator (MLC) treatments, segments are continuously adapted to the target centroid motion in beams-eye-view. On-the-fly segment adaptation, however, potentially induces dosimetric errors due to the finite MLC leaf width and non-rigid target motion. In this study, we outline a novel tool for computing the 4d dose of lung SBRT plans delivered with MLC tracking. Methods: The following automated workflow was developed: A) centroid tracking, where the initial segments are morphed to each 4dCT phase based on the beams-eye-view GTV shift (followed by a dose calculation on each phase); B) re-optimized tracking, in which all morphedmore » initial plans from (A) are further optimised (“warm-started”) in each 4dCT phase using the initial optimisation parameters but phase-specific volume definitions. Finally, both dose sets are accumulated to the reference phase using deformable image registration. Initial plans were generated according to the RTOG-1021 guideline (54Gy, 3-Fx, equidistant 9-beam IMRT) on the peak-exhale (reference) phase of a phase-binned 4dCT. Treatment planning and delivery simulations were performed in RayStation (research v4.6) using our in-house segment-morphing algorithm, which directly links to RayStation through a native C++ interface. Results: Computing the tracking plans and 4d dose distributions via the in-house interface takes 5 and 8 minutes respectively for centroid and re-optimized tracking. For a sample lung SBRT patient with 14mm peak-to-peak motion in sup-inf direction, mainly perpendicular leaf motion (0-collimator) resulted in small dose changes for PTV-D95 (−13cGy) and GTV-D98 (+18cGy) for the centroid tracking case compared to the initial plan. Modest reductions of OAR doses (e.g. spinal cord D2: −11cGy) were achieved in the idealized tracking case. Conclusion: This study presents an automated “1-click” workflow for computing deliverable MLC tracking doses in RayStation. Adding a non-deliverable re-optimized tracking scenario is expected to help quantify plan robustness for more challenging patients with anatomy deformations. We acknowledge support of the MLC tracking research from Elekta AB. MFF is supported by Cancer Research UK under Programme C33589/A19908. Research at ICR is also supported by Cancer Research UK under Programme C33589/A19727 and NHS funding to the NIHR Biomedical Research Centre at RMH and ICR.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase requirements? 1000.50 Section 1000.50 Indians OFFICE OF THE...) Planning and Negotiation Grants Advance Planning Grant Funding § 1000.50 What must a Tribe/Consortium...
NASA Astrophysics Data System (ADS)
Lee, Jae-Seung; Im, In-Chul; Kang, Su-Man; Goo, Eun-Hoe; Baek, Seong-Min
2013-11-01
The aim of this study was to quantitatively analyze the changes in the planning target volume (PTV) and liver volume dose based on the respiratory phase to identify the optimal respiratory phase for respiratory-gated radiation therapy for a hepatocellular carcinoma (HCC). Based on the standardized procedure for respiratory-gated radiation therapy, we performed a 4-dimensional computed tomography simulation for 0 ˜ 90%, 30 ˜ 70%, and 40 ˜ 60% respiratory phases to assess the respiratory stability (S R ) and the defined PTV i for each respiratory phase i. A treatment plan was established, and the changes in the PTV i and dose volume of the liver were quantitatively analyzed. Most patients (91.5%) passed the respiratory stability test (S R = 0.111 ± 0.015). With standardized respiration training exercises, we were able to minimize the overall systematic error caused by irregular respiration. Furthermore, a quantitative analysis to identify the optimal respiratory phase revealed that when a short respiratory phase (40 ˜ 60%) was used, the changes in the PTV were concentrated inside the center line; thus, we were able to obtain both a PTV margin accounting for respiration and a uniform radiation dose within the PTV.
NASA Astrophysics Data System (ADS)
Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka
Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.
Additional EIPC Study Analysis. Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadley, Stanton W; Gotham, Douglas J.; Luciani, Ralph L.
Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations weremore » developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 14 topics was developed for further analysis. This paper brings together the earlier interim reports of the first 13 topics plus one additional topic into a single final report.« less
Morristown Alternative Transportation Study Phase II.
DOT National Transportation Integrated Search
2005-10-14
This report summarizes the Phase II planning effort conducted by the park and the US Department of Transportation's Volpe Center (the Volpe Center) to articulate a viable park-community pilot transit service for Morristown National Historical Park. M...
NASA Technical Reports Server (NTRS)
Cannon, W. H.; Petrachenko, W. T.; Yen, J. L.; Galt, J. A.; Waltman, W. B.; Knoweles, S. H.; Popelar, J.
1980-01-01
A pilot project to establish an operational phase stable very long baseline interferometer (VLBI) for geophysical studies is described. Methods for implementation as well as practical applications are presented.
Study of CETA Plans and Reservation Economic Development. Executive Summary.
ERIC Educational Resources Information Center
Fazio, Ernest J., Jr.; Kelly, Patricia F.
Field study and analysis of program documents were undertaken in the first phase of a multi-phased research effort to improve and strengthen the relationships between CETA programs and economic development activities on Indian reservations. Exploratory in nature, the study examined the approaches developed by 24 Indian reservations and Native…
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
SELF-INSTRUCTIONAL SUPPLEMENTS FOR A TELEVISED PHYSICS COURSE, STUDY PLAN AND EXPERIMENTAL DESIGN.
ERIC Educational Resources Information Center
KLAUS, DAVID J.; LUMSDAINE, ARTHUR A.
THE INITIAL PHASES OF A STUDY OF SELF-INSTRUCTIONAL AIDS FOR A TELEVISED PHYSICS COURSE WERE DESCRIBED. THE APPROACH, EXPERIMENTAL DESIGN, PROCEDURE, AND TECHNICAL ASPECTS OF THE STUDY PLAN WERE INCLUDED. THE MATERIALS WERE PREPARED TO SUPPLEMENT THE SECOND SEMESTER OF HIGH SCHOOL PHYSICS. THE MATERIAL COVERED STATIC AND CURRENT ELECTRICITY,…
Modular Digital Missile Guidance, Phase I2
1976-01-28
at OMR. The revised study plan was fornally approved by ONR on 29 May 1975, confining the sinulatlon analysis work to a Class II missile with...functions analyzed in tne Phase I and Phase 11 studies . It can be seen thatf tnere practicable» (based on the results of function partitioning trade...llaillAU AS a result of this study » three generic missile families have oeen established and» relative to this classification» on
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-02
..., choosing a study population, using a control group and blinding, dose selection, treatment plans...] Draft Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of Cellular... document entitled ``Guidance for Industry: Considerations for the Design of Early-Phase Clinical Trials of...
Planned Closeout of the Cf-252 Loan/Lease Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sherman, Steven R; Patton, Bradley D
2012-09-01
New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.
Mississippi Sound and Adjacent Areas Study Plan for Data-Handling and Analysis.
1983-03-01
4) C34;14 0 o r 4 4.1 Si ~oo4) 4. 4.41a 0 to P4 ~ U4 1402 plans will require the same data types and data forms and formats. 35 . Once the data in...prepared or gathered for the ZSM study. It will be necessary to telephone each contact point during this work phase to ensure that there is adequate...used to record information on the data form and format. 35 Phase 8: Identify Available Useful Data 47. The identification of useful data starts with an
Low Temperature Power Coating (LTPC) Phase 2 Laboratory Test Plan and Procedures for PACAF (Rev D)
2018-03-20
Δa*, LTPC Phase II Laboratory Test Plan and Procedures Rev D (CDRL A004) BATTELLE | 20 March 2018 | 6 Δb* and ΔE will be calculated post ...BATTELLE | CONTRACT NUMBER: FA8532-17-C-0008 (CDRL A004) LTPC Phase II Laboratory Test Plan and Procedures (Rev D) Prepared by... Test Plan and Procedures Rev D (CDRL A004) BATTELLE | 20 March 2018 | i List of Acronyms AGE Aircraft Ground Equipment ASTM American
Implementing Total Quality Management in a University Setting.
ERIC Educational Resources Information Center
Coate, L. Edwin
1991-01-01
Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…
U.S. DOT roadway transportation data business plan (phase 1) : data business plan.
DOT National Transportation Integrated Search
1999-12-01
This report documents the results of an evaluation of satellite communication systems for mayday applications conducted as part of the Rural Applications of Advanced Traveler Information Systems (ATIS) study. It focuses on satellite communications sy...
Spacecraft servicing demonstration plan
NASA Technical Reports Server (NTRS)
Bergonz, F. H.; Bulboaca, M. A.; Derocher, W. L., Jr.
1984-01-01
A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.
Inauen, Jennifer; Mosler, Hans-Joachim
2016-01-01
Theory-based interventions can enhance people's safe water consumption, but the sustainability of these interventions and the mechanisms of maintenance remain unclear. We investigated these questions based on an extended theory of planned behaviour. Seven hundred and ten (445 analysed) randomly selected households participated in two cluster-randomised controlled trials in Bangladesh. Study 1 promoted switching to neighbours' arsenic-safe wells, and Study 2 promoted switching to arsenic-safe deep wells. Both studies included two intervention phases. Structured interviews were conducted at baseline (T1), and at 1-month (T2), 2-month (T3) and 9-month (T4) follow-ups. In intervention phase 1 (between T1 and T2), commitment-based behaviour change techniques--reminders, implementation intentions and public commitment--were combined with information and compared to an information-only control group. In phase 2 (between T2 and T3), half of each phase 1 intervention group was randomly assigned to receive either commitment-based techniques once more or coping planning with reminders and information. Initial well-switching rates of up to 60% significantly declined by T4: 38.3% of T2 safe water users stopped consuming arsenic-safe water. The decline depended on the intervention. Perceived behavioural control, intentions, commitment strength and coping planning were associated with maintenance. In line with previous studies, the results indicate that commitment and reminders engender long-term behavioural change.
Admiraal, Marjan A; Schuring, Danny; Hurkmans, Coen W
2008-01-01
The purpose of this study was to determine the 4D accumulated dose delivered to the CTV in stereotactic radiotherapy of lung tumours, for treatments planned on an average CT using an ITV derived from the Maximum Intensity Projection (MIP) CT. For 10 stage I lung cancer patients, treatment plans were generated based on 4D-CT images. From the 4D-CT scan, 10 time-sorted breathing phases were derived, along with the average CT and the MIP. The ITV with a margin of 0mm was used as a PTV to study a worst case scenario in which the differences between 3D planning and 4D dose accumulation will be largest. Dose calculations were performed on the average CT. Dose prescription was 60Gy to 95% of the PTV, and at least 54Gy should be received by 99% of the PTV. Plans were generated using the inverse planning module of the Pinnacle(3) treatment planning system. The plans consisted of nine coplanar beams with two segments each. After optimisation, the treatment plan was transferred to all breathing phases and the delivered dose per phase was calculated using an elastic body spline model available in our research version of Pinnacle (8.1r). Then, the cumulative dose to the CTV over all breathing phases was calculated and compared to the dose distribution of the original treatment plan. Although location, tumour size and breathing-induced tumour movement varied widely between patients, the PTV planning criteria could always be achieved without compromising organs at risk criteria. After 4D dose calculations, only very small differences between the initial planned PTV coverage and resulting CTV coverage were observed. For all patients, the dose delivered to 99% of the CTV exceeded 54Gy. For nine out of 10 patients also the criterion was met that the volume of the CTV receiving at least the prescribed dose was more than 95%. When the target dose is prescribed to the ITV (PTV=ITV) and dose calculations are performed on the average CT, the cumulative CTV dose compares well to the planned dose to the ITV. Thus, the concept of treatment plan optimisation and evaluation based on the average CT and the ITV is a valid approach in stereotactic lung treatment. Even with a zero ITV to PTV margin, no significantly different dose coverage of the CTV arises from the breathing motion induced dose variation over time.
Trans-Pacific HDR Satellite Communications Experiment Phase-2 Project Plan and Experimental Network
NASA Technical Reports Server (NTRS)
Hsu, Eddie; Kadowaki, Naoto; Yoshimura, Naoko; Takahashi, Takashi; Yoshikawa, Makoto; Bergman, Larry; Bhasin, Kul
2000-01-01
The trans-Pacific high data rate (TP-HDR) satellite communications experiment was proposed at the Japan-U.S. Cooperation in Space (JUCS) Program Workshop held in Hawaii in 1993 and remote high definition video post-production was demonstrated as the first phase trial. ATM-based 45 Mbps trans-Pacific link was established in the first phase, and the following experiments with 155 Mbps was planned as the phase 2. This paper describes the experimental network configuration and project plan of TP-HDR experiment phase 2. Additional information is provided in the original.
Space station WP-04 power system. Volume 2: Study results
NASA Technical Reports Server (NTRS)
Hallinan, G. J.
1987-01-01
Results of the phase B study contract for the definition of the space station Electric Power System (EPS) are presented in detail along with backup information and supporting data. Systems analysis and trades, preliminary design, advanced development, customer accommodations, operations planning, product assurance, and design and development phase planning are addressed. The station design is a hybrid approach which provides user power of 25 kWe from the photovoltaic subsystem and 50 kWe from the solar dynamic subsystem. The electric power is distributed to users as a utility service; single phase at a frequency of 20 kHz and voltage of 440VAC. The solar array NiH2 batteries of the photovoltaic subsystem are based on commonality to those used on the co-orbiting and solar platforms.
Technology Plan for the Terrestrial Planet Finder Interferometer
NASA Technical Reports Server (NTRS)
Lawson, Peter R. (Editor); Dooley, Jennifer A. (Editor)
2005-01-01
The technology plan for the Terrestrial Planet Finder Interferometer (TPF-I) describes the breadth of technology development currently envisaged to enable TPF-I to search for habitable worlds around nearby stars. TPF-I is currently in Pre-Phase A (the Advanced Study Phase) of its development. For planning purposes, it is expected to enter into Phase A in 2010 and be launched sometime before 2020. TPF-I is being developed concurrently with the Terrestrial Planet Finder Coronagraph (TPF-C), whose launch is anticipated in 201 6. The missions are being designed with the capability to detect Earth-like planets should they exist in the habitable zones of Sun-like (F,G, and K) stars out to a distance of about 60 light-years. Each mission will have the starlight-suppression and spectroscopic capability to enable the characterization of extrasolar planetary atmospheres, identifying biomarkers and signs of life. TPF-C is designed as a visible-light coronagraph; TPF-I is designed as a mid-infrared formation-flying interferometer. The two missions, working together, promise to yield unambiguous detections and characterizations of Earth-like planets. The challenges of planet detections with mid-infrared formation-flying interferometry are described within this technology plan. The approach to developing the technology is described through roadmaps that lead from our current state of the art through the different phases of mission development to launch. Technology metrics and milestones are given to measure progress. The emphasis of the plan is development and acquisition of technology during pre-Phase A to establish feasibility of the mission to enter Phase A sometime around 2010. Plans beyond 2010 are outlined. The plan contains descriptions of the development of new component technology as well as testbeds that demonstrate the viability of new techniques and technology required for the mission. Starlight-suppression (nulling) and formation-flying technology are highlighted. Although the techniques are described herein, the descriptions are only at a high-level, and tutorial material is not included. The reader is expected to have some familiarity with the principles of long-baseline mid-infrared interferometry. Selected references to existing literature are given where relevant.
Adherence to Antidepressant Treatment Among Privately Insured Patients Diagnosed With Depression
Akincigil, Ayse; Bowblis, John R.; Levin, Carrie; Walkup, James T.; Jan, Saira; Crystal, Stephen
2008-01-01
Background Antidepressants are effective in treatment of depression, but poor adherence to medication is a major obstacle to effective care. Objective We sought to describe patient and provider level factors associated with treatment adherence. Methods This was a retrospective, observational study using medical and pharmacy claims from a large health plan, for services provided between January 2003 and January 2005. We studied a total of 4312 subjects ages 18 or older who were continuously enrolled in the health plan with a new episode of major depression and who initiated antidepressant treatment. Treatment adherence was measured by using pharmacy refill records during the first 16 weeks (acute phase) and the 17–33 weeks after initiation of antidepressant therapy (continuation phase). Measures were based on Health Plan Employer Data and Information Set (HEDIS) quality measures for outpatient depression care. Results Fifty-one percent of patients were adherent through the acute phase; of those, 42% remained adherent in the continuation phase. Receipt of follow-up care from a psychiatrist and higher general pharmacy utilization (excluding psychotropics) were associated with better adherence in both phases. Younger age, comorbid alcohol or other substance abuse, comorbid cardiovascular/metabolic conditions, use of older generation antidepressants, and residence in lower-income neighborhoods were associated with lower acute-phase adherence. Continuation-phase adherence was lower for HMO participants than for others. Conclusion In an insured population, many patients fall short of adherence to guideline recommended therapy for depression. Information from existing administrative data can be used to predict patients at highest risk of nonadherence, such as those with substance abuse, and to target interventions. PMID:17496721
Planning In Rural Areas: Evaluation of The Land Resource.
ERIC Educational Resources Information Center
Carlson, Steven A.; Denney, Evan
A rural land use project originated in the early 1970s when a landowner approached the University of Montana's Department of Geography asking for assistance in planning the use of more than 10,000 acres. The planning process evolved into four phases; the first three phases (biophysical assessment, capability analysis, and master planning) have…
Sys, Gwen; Eykens, Hannelore; Lenaerts, Gerlinde; Shumelinsky, Felix; Robbrecht, Cedric; Poffyn, Bart
2017-06-01
This study analyses the accuracy of three-dimensional pre-operative planning and patient-specific guides for orthopaedic osteotomies. To this end, patient-specific guides were compared to the classical freehand method in an experimental setup with saw bones in two phases. In the first phase, the effect of guide design and oscillating versus reciprocating saws was analysed. The difference between target and performed cuts was quantified by the average distance deviation and average angular deviations in the sagittal and coronal planes for the different osteotomies. The results indicated that for one model osteotomy, the use of guides resulted in a more accurate cut when compared to the freehand technique. Reciprocating saws and slot guides improved accuracy in all planes, while oscillating saws and open guides lead to larger deviations from the planned cut. In the second phase, the accuracy of transfer of the planning to the surgical field with slot guides and a reciprocating saw was assessed and compared to the classical planning and freehand cutting method. The pre-operative plan was transferred with high accuracy. Three-dimensional-printed patient-specific guides improve the accuracy of osteotomies and bony resections in an experimental setup compared to conventional freehand methods. The improved accuracy is related to (1) a detailed and qualitative pre-operative plan and (2) an accurate transfer of the planning to the operation room with patient-specific guides by an accurate guidance of the surgical tools to perform the desired cuts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McGlade, J; Kassaee, A
2015-06-15
Purpose: To evaluate planning methods for anal canal cancer and compare the results of 9-field Intensity Modulated Radiotherapy (IMRT), Volumetric Modulated Arc Therapy (Varian, RapidArc), and Proton Pencil Beam Scanning (PBS). Methods: We generated plans with IMRT, RapidArc (RA) and PBS for twenty patients for both initial phase including nodes and cone down phase of treatment using Eclipe (Varian). We evaluated the advantage of each technique for each phase. RA plans used 2 to 4 arcs and various collimator orientations. PBS used two posterior oblique fields. We evaluated the plans comparing dose volume histogram (DVH), locations of hot spots, andmore » PTV dose conformity. Results: Due to complex shape of target, for RA plans, multiple arcs (>2) are required to achieve optimal PTV conformity. When the PTV exceeds 15 cm in the superior-inferior direction, limitations of deliverability start to dominate. The PTV should be divided into a superior and an inferior structure. The optimization is performed with fixed jaws for each structure and collimator set to 90 degrees for the inferior PTV. Proton PBS plans show little advantage in small bowel sparing when treating the nodes. However, PBS plan reduces volumetric dose to the bladder at the cost of higher doses to the perineal skin. IMRT plans provide good target conformity, but they generate hot spots outside of the target volume. Conclusion: When using one planning technique for entire course of treatment, Multiple arc (>2) RA plans are better as compared to IMRT and PBS plans. When combining techniques, RA for the initial phase in combination with PBS for the cone down phase results in the most optimal plans.« less
MO-FG-BRA-08: Swarm Intelligence-Based Personalized Respiratory Gating in Lung SAbR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Modiri, A; Sabouri, P; Sawant, A
Purpose: Respiratory gating is widely deployed as a clinical motion-management strategy in lung radiotherapy. In conventional gating, the beam is turned on during a pre-determined phase window; typically, around end-exhalation. In this work, we challenge the notion that end-exhalation is always the optimal gating phase. Specifically, we use a swarm-intelligence-based, inverse planning approach to determine the optimal respiratory phase and MU for each beam with respect to (i) the state of the anatomy at each phase and (ii) the time spent in that state, estimated from long-term monitoring of the patient’s breathing motion. Methods: In a retrospective study of fivemore » lung cancer patients, we compared the dosimetric performance of our proposed personalized gating (PG) with that of conventional end-of-exhale gating (CEG) and a previously-developed, fully 4D-optimized plan (combined with MLC tracking delivery). For each patient, respiratory phase probabilities (indicative of the time duration of the phase) were estimated over 2 minutes from lung tumor motion traces recorded previously using the Synchrony system (Accuray Inc.). Based on this information, inverse planning optimization was performed to calculate the optimal respiratory gating phase and MU for each beam. To ensure practical deliverability, each PG beam was constrained to deliver the assigned MU over a time duration comparable to that of CEG delivery. Results: Maximum OAR sparing for the five patients achieved by the PG and the 4D plans compared to CEG plans was: Esophagus Dmax [PG:57%, 4D:37%], Heart Dmax [PG:71%, 4D:87%], Spinal cord Dmax [PG:18%, 4D:68%] and Lung V13 [PG:16%, 4D:31%]. While patients spent the most time in exhalation, the PG-optimization chose end-exhale only for 28% of beams. Conclusion: Our novel gating strategy achieved significant dosimetric improvements over conventional gating, and approached the upper limit represented by fully 4D optimized planning while being significantly simpler and more clinically translatable. This work was partially supported through research funding from National Institutes of Health (R01CA169102) and Varian Medical Systems, Palo Alto, CA, USA.« less
JWST Operations and the Phase I and II Process
NASA Astrophysics Data System (ADS)
Beck, Tracy L.
2010-07-01
The JWST operations and Phase I and Phase II process will build upon our knowledge on the current system in use for HST. The primary observing overheads associated with JWST observations, both direct and indirect, are summarized. While some key operations constraints for JWST may cause deviations from the HST model for proposal planning, the overall interface to JWST planning will use the APT and will appear similar to the HST interface. The requirement is to have a proposal planning model simlar to HST, where proposals submitted to the TAC must have at least the minimum amount of information necessary for assessment of the strength of the science. However, a goal of the JWST planning process is to have the submitted Phase I proposal in executable form, and as complete as possible for many programs. JWST will have significant constraints on the spacecraft pointing and orient, so it is beneficial for the planning process to have these scheduling constraints on programs defined as early as possible. The guide field of JWST is also much smaller than the HST guide field, so searches for available guide stars for JWST science programs must be done at the Phase I deadline. The long range observing plan for each JWST cycle will be generated intially from the TAC accepted programs at the Phase I deadline, and the LRP will be refined after the Phase II deadline when all scheduling constraints are defined.
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
Short-range transit planning : current practice and a proposed framework
DOT National Transportation Integrated Search
1984-06-01
The research described in this report explored the service and operations : planning process in the transit industry in a two-phase approach. In the first : phase a detailed assessment of current short range transit planning practice was : undertaken...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kang, S; Kim, D; Kim, T
2016-06-15
Purpose: To propose a simple and effective cost value function to search optimal planning phase (gating window) and demonstrated its feasibility for respiratory correlated radiation therapy. Methods: We acquired 4DCT of 10 phases for 10 lung patients who have tumor located near OARs such as esophagus, heart, and spinal cord (i.e., central lung cancer patients). A simplified mathematical optimization function was established by using overlap volume histogram (OVH) between the target and organ at risk (OAR) at each phase and the tolerance dose of selected OARs to achieve surrounding OARs dose-sparing. For all patients and all phases, delineation of themore » target volume and selected OARs (esophagus, heart, and spinal cord) was performed (by one observer to avoid inter-observer variation), then cost values were calculated for all phases. After the breathing phases were ranked according to cost value function, the relationship between score and dose distribution at highest and lowest cost value phases were evaluated by comparing the mean/max dose. Results: A simplified mathematical cost value function showed noticeable difference from phase to phase, implying it is possible to find optimal phases for gating window. The lowest cost value which may result in lower mean/max dose to OARs was distributed at various phases for all patients. The mean doses of the OARs significantly decreased about 10% with statistical significance for all 3 OARs at the phase with the lowest cost value. Also, the max doses of the OARs were decreased about 2∼5% at the phase with the lowest cost value compared to the phase with the highest cost value. Conclusion: It is demonstrated that optimal phases (in dose distribution perspective) for gating window could exist differently through each patient and the proposed cost value function can be a useful tool for determining such phases without performing dose optimization calculations. This research was supported by the Mid-career Researcher Program through NRF funded by the Ministry of Science, ICT & Future Planning of Korea (NRF-2014R1A2A1A10050270) and by the Radiation Technology R&D program through the National Research Foundation of Korea funded by the Ministry of Science, ICT & Future Planning (No. 2013M2A2A7038291)« less
Why and for Whom May Coping Planning Have Adverse Effects? A Moderated Mediation Analysis.
Inauen, Jennifer; Stocker, Andrea; Scholz, Urte
2018-05-09
Coping planning, the formation of plans to overcome behavioral barriers is assumed to promote health behavior maintenance, but the literature on this is inconsistent. In this study, we aimed to investigate the mechanisms of a coping planning intervention that adversely affected maintained safe water consumption. We also explored perceived behavioral difficulty as a potential moderator of coping planning interventions. In the second phase of a cluster-randomised trial, households (N = 177 analyzed) were randomly allocated to a coping planning intervention or a comparison group (repetition of interventions from first intervention phase). Safe water consumption, the mechanisms of coping planning, and perceived difficulty were measured pre-post. The data were analyzed using mediation and moderated mediation analysis. Changes in behavioral intention mediated the intervention effects on behavioral maintenance (b = -0.36, 95% CI [-0.91, -0.03]). Changes in perceived coping planning (b = 0.08, 95% CI [-0.12, 0.34]), and maintenance self-efficacy (b = -0.13, 95% CI [-0.45, 0.01]) did not mediate the effects. Prior perceived difficulty moderated the coping planning intervention effects on maintenance via intention. Coping planning may decrease motivation for health behavior maintenance for persons who experienced few barriers prior to the planning intervention. © 2018 The International Association of Applied Psychology.
NASA Technical Reports Server (NTRS)
Hen, Itay; Rieffel, Eleanor G.; Do, Minh; Venturelli, Davide
2014-01-01
There are two common ways to evaluate algorithms: performance on benchmark problems derived from real applications and analysis of performance on parametrized families of problems. The two approaches complement each other, each having its advantages and disadvantages. The planning community has concentrated on the first approach, with few ways of generating parametrized families of hard problems known prior to this work. Our group's main interest is in comparing approaches to solving planning problems using a novel type of computational device - a quantum annealer - to existing state-of-the-art planning algorithms. Because only small-scale quantum annealers are available, we must compare on small problem sizes. Small problems are primarily useful for comparison only if they are instances of parametrized families of problems for which scaling analysis can be done. In this technical report, we discuss our approach to the generation of hard planning problems from classes of well-studied NP-complete problems that map naturally to planning problems or to aspects of planning problems that many practical planning problems share. These problem classes exhibit a phase transition between easy-to-solve and easy-to-show-unsolvable planning problems. The parametrized families of hard planning problems lie at the phase transition. The exponential scaling of hardness with problem size is apparent in these families even at very small problem sizes, thus enabling us to characterize even very small problems as hard. The families we developed will prove generally useful to the planning community in analyzing the performance of planning algorithms, providing a complementary approach to existing evaluation methods. We illustrate the hardness of these problems and their scaling with results on four state-of-the-art planners, observing significant differences between these planners on these problem families. Finally, we describe two general, and quite different, mappings of planning problems to QUBOs, the form of input required for a quantum annealing machine such as the D-Wave II.
Planning a Teaching Sequence for the Teaching of Chemical Bonding
ERIC Educational Resources Information Center
Sibanda, Doras; Hobden, Paul
2015-01-01
The current study seeks to examine how teachers plan teaching sequences to teach chemical bonding in the senior secondary phase of schooling. The study employs a learning demand tool as interpretive framework. A mixed method was used to guide the collection of data. Data were collected through a survey instrument with 227 practising physical…
NASA Technical Reports Server (NTRS)
1971-01-01
The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.
NASA Technical Reports Server (NTRS)
Voorhies, C. V.; Langel, R. A.; Slavin, J.; Lancaster, E. R.; Jones, S.
1991-01-01
Prelaunch and postlaunch calibration plans for the APAFO magnetometer experiment are presented. A study of tradeoffs between boom length and spacecraft field is described; the results are summarized. The prelaunch plan includes: calibration of the Vector Fluxgate Magnetometer (VFM), Star Sensors, and Scalar Helium Magnetometer (SHM); optical bench integration; and acquisition of basic spacecraft field data. Postlaunch calibration has two phases. In phase one, SHM data are used to calibrate the VFM, total vector magnetic field data are used to calibrate a physical model of the spacecraft field, and both calibrations are refined by iteration. In phase two, corrected vector data are transformed into geocentric coordinates, previously undetected spacecraft fields are isolated, and initial geomagnetic field models are computed. Provided the SHM is accurate to the required 1.0 nT and can be used to calibrate the VFM to the required 3.0- nT accuracy, the tradeoff study indicates that a 12 m boom and a spacecraft field model uncertainty of 5 percent together allow the 1.0 nT spacecraft field error requirement to be met.
Computational path planner for product assembly in complex environments
NASA Astrophysics Data System (ADS)
Shang, Wei; Liu, Jianhua; Ning, Ruxin; Liu, Mi
2013-03-01
Assembly path planning is a crucial problem in assembly related design and manufacturing processes. Sampling based motion planning algorithms are used for computational assembly path planning. However, the performance of such algorithms may degrade much in environments with complex product structure, narrow passages or other challenging scenarios. A computational path planner for automatic assembly path planning in complex 3D environments is presented. The global planning process is divided into three phases based on the environment and specific algorithms are proposed and utilized in each phase to solve the challenging issues. A novel ray test based stochastic collision detection method is proposed to evaluate the intersection between two polyhedral objects. This method avoids fake collisions in conventional methods and degrades the geometric constraint when a part has to be removed with surface contact with other parts. A refined history based rapidly-exploring random tree (RRT) algorithm which bias the growth of the tree based on its planning history is proposed and employed in the planning phase where the path is simple but the space is highly constrained. A novel adaptive RRT algorithm is developed for the path planning problem with challenging scenarios and uncertain environment. With extending values assigned on each tree node and extending schemes applied, the tree can adapts its growth to explore complex environments more efficiently. Experiments on the key algorithms are carried out and comparisons are made between the conventional path planning algorithms and the presented ones. The comparing results show that based on the proposed algorithms, the path planner can compute assembly path in challenging complex environments more efficiently and with higher success. This research provides the references to the study of computational assembly path planning under complex environments.
Ciftci, Bestami; Uzel, Nesibe; Ozel, M Onur; Zergeroglu, Sema; Deger, Cetin; Turasan, S Sare; Karakoc, Ayse Gul; Ozbalci, Semra
2016-01-01
Aim This study aims to assess the educational needs of family practitioners and evaluate the efficacy of the ongoing “Maternal Health and Family Planning Distance Education” program conducted by the General Directorate of Health Research (SAGEM) of the Turkish Ministry of Health. Methods This study consisted of three phases. In the first phase, an online survey on maternal health and family planning educational needs was sent to 20,611 physicians via e-mail. Of the 20,611 physicians, 4,729 completed the survey. In the second phase, of the 1,061 physicians registered to the education program, 632 physicians with active participation were included. In the third phase, the preeducation expectations of 287 physicians and posteducation satisfaction of 54 physicians were analyzed with a questionnaire. Results The majority of the physicians were employed in a family health center (97.4%) and practicing for 16–20 years (23.2%) without any prior in-service training (60.9%). High-to-very high educational need was expressed by 56.4% of physicians for pregnancy, delivery, and puerperality. Topics that the physicians, including both those with ≥16 years in practice and without prior in-service training, expressed need for more detailed content were pregnancy, delivery, and puerperality (37.5%); emergency obstetric approach in the primary care setting (33.1%); and gynecological infectious diseases and treatment approach (32.4%). Following the education program, the participants’ expectations were fulfilled in terms of refreshing their knowledge, particularly in the field of Maternal Health and Family Planning (87.1% and 75.9%) and the percentage of participants who expressed that they had sufficient high level knowledge increased from 55% to 68.5%. Conclusion The education on Maternal Health and Family Planning refreshed the knowledge of participants and highly met the preeducation expectations. Determining the educational needs and expectations of the target population prior to the education program seems to have an important role on determining its overall success. PMID:27354837
Ciftci, Bestami; Uzel, Nesibe; Ozel, M Onur; Zergeroglu, Sema; Deger, Cetin; Turasan, S Sare; Karakoc, Ayse Gul; Ozbalci, Semra
2016-01-01
This study aims to assess the educational needs of family practitioners and evaluate the efficacy of the ongoing "Maternal Health and Family Planning Distance Education" program conducted by the General Directorate of Health Research (SAGEM) of the Turkish Ministry of Health. This study consisted of three phases. In the first phase, an online survey on maternal health and family planning educational needs was sent to 20,611 physicians via e-mail. Of the 20,611 physicians, 4,729 completed the survey. In the second phase, of the 1,061 physicians registered to the education program, 632 physicians with active participation were included. In the third phase, the preeducation expectations of 287 physicians and posteducation satisfaction of 54 physicians were analyzed with a questionnaire. The majority of the physicians were employed in a family health center (97.4%) and practicing for 16-20 years (23.2%) without any prior in-service training (60.9%). High-to-very high educational need was expressed by 56.4% of physicians for pregnancy, delivery, and puerperality. Topics that the physicians, including both those with ≥16 years in practice and without prior in-service training, expressed need for more detailed content were pregnancy, delivery, and puerperality (37.5%); emergency obstetric approach in the primary care setting (33.1%); and gynecological infectious diseases and treatment approach (32.4%). Following the education program, the participants' expectations were fulfilled in terms of refreshing their knowledge, particularly in the field of Maternal Health and Family Planning (87.1% and 75.9%) and the percentage of participants who expressed that they had sufficient high level knowledge increased from 55% to 68.5%. The education on Maternal Health and Family Planning refreshed the knowledge of participants and highly met the preeducation expectations. Determining the educational needs and expectations of the target population prior to the education program seems to have an important role on determining its overall success.
Institutional Mapping Towards Developing a Framework for Sustainable Marine Spatial Planning
NASA Astrophysics Data System (ADS)
Yatim, M. H. M.; Omar, A. H.; Abdullah, N. M.; Hashim, N. M.
2016-09-01
Within few years before, the urge to implement the marine spatial planning is due to increasing numbers of marine activities that will lead into uncertainties of rights, restrictions and responsibilities of the maritime nations. Marine authorities in this situation that deal with national rights and legislations are the government institutions that engage with marine spatial information. There are several elements to be considered when dealing with the marine spatial planning; which is institutional sustainability governance. Providing the importance of marine spatial planning towards sustainable marine spatial governance, the focus should highlight the role marine institutions towards sustainable marine plan. The iterative process of marine spatial planning among marine institutions is important as the spatial information governance is scattered from reflected rights, restrictions and responsibilities of marine government institutions. Malaysia is one of the maritime nations that conjures the initial step towards establishing the sustainable marine spatial planning. In order to have sustainable institutions in marine spatial planning process, it involves four main stages; planning phase, plan evaluation phase, implementation phase and post implementation phase. Current situation has witnessed the unclear direction and role of marine government institutions to manage the marine spatial information. This review paper is focusing on the institutional sustainability upon interaction of marine government institutions in the marine spatial planning process based on Institutional Analysis Framework. The outcome of the integration of institutional sustainability and marine spatial planning process will propose a framework of marine institutional sustainable plan.
Development of Phased-Array Ultrasonic Testing Acceptability Criteria : (Phase II)
DOT National Transportation Integrated Search
2014-10-01
The preliminary technical approach and scan plans developed during phase I of this research was implemented on testing four butt-weld specimens. The ray path analysis carried out to develop the scan plans and the preliminary data analysis indicated t...
Norm Henry; Karen Sendek
1985-01-01
Abstract - The California Department of Forestry and U.S. Forest Service, Pacific Southwest Forest and Range Experiment Station have been conducting a paired watershed study on Jackson Demonstration State Forest for 24 years. The South Fork watershed phase of the study involved monitoring the impacts of road construction (1967) and selective tractor logging (1971-1973...
NASA Technical Reports Server (NTRS)
1973-01-01
The Life Sciences Payload Definition and Integration Study was composed of four major tasks. Tasks A and B, the laboratory definition phase, were the subject of prior NASA study. The laboratory definition phase included the establishment of research functions, equipment definitions, and conceptual baseline laboratory designs. These baseline laboratories were designated as Maxi-Nom, Mini-30, and Mini-7. The outputs of Tasks A and B were used by the NASA Life Sciences Payload Integration Team to establish guidelines for Tasks C and D, the laboratory integration phase of the study. A brief review of Tasks A and B is presented provide background continuity. The tasks C and D effort is the subject of this report. The Task C effort stressed the integration of the NASA selected laboratory designs with the shuttle sortie module. The Task D effort updated and developed costs that could be used by NASA for preliminary program planning.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-06
... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...
The Planning, Implementation, and Movement of an Academic Library Collection.
ERIC Educational Resources Information Center
Kurkul, Donna Lee
1983-01-01
Discusses methodology, logistics, and time/cost study of planning, implementation, and relocation of 682,810 volume Smith College Library collection into its newly constructed and renovated facility. Call number sequence location, collection movement phasing and formulas for sequence distribution, and personnel requirements are noted. Elementary…
AIA SCHOOL PLANT STUDIES. A SELECTION 1952-1962.
ERIC Educational Resources Information Center
PAWLEY, ERIC
A COLLECTION OF 40 ARTICLES DISCUSSES VARIOUS ASPECTS OF SCHOOL PLANNING PROBLEMS. THOSE ON PRELIMINARY PHASES REVIEW--(1) ARCHITECT SELECTION, (2) DEVELOPMENT OF EDUCATIONAL PROGRAMS, AND (3) SCHOOL COSTS. ARCHITECTURALLY-)RIENTED ARTICLES COVER--(1) CONSTRUCTION AND STRUCTURAL TYPES, (2) STANDARD SCHOOL PLANS, (3) FLEXIBILITY, (4)…
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
Ahamed, Shabbir; Singh, Navin; Gudipudi, Deleep; Mulinti, Suneetha; Talluri, Anil; Soubhagya, Bhudevi; Sresty, Madhusudhana
2017-03-01
To quantify relative merit of MU deprived plans against freely optimized plans in terms of plan quality and report changes induced by progressive resolution optimizer algorithm (PRO3) to the dynamic parameters of RapidArc. Ten cases of carcinoma hypopharynx were retrospectively planned in three phases without using MU tool. Replicas of these baseline plans were reoptimized using "Intermediate dose" feature and "MU tool" to reduce MUs by 20%, 35%, and 50%. Overall quality indices for target and OAR, integral dose, dose-volume spread were assessed. All plans were appraised for changes induced in RapidArc dynamic parameters and pre-treatment quality assurance (QA). With increasing MU reduction strength (MURS), MU/Gy values reduced, for all phases with an overall range of 8.6-34.7%; mean dose rate decreased among plans of each phase, phase3 plans recorded greater reductions. MURS20% showed good trade-off between MUs and plan quality. Dose-volume spread below 5Gy was higher for baseline plans while lower between 20 and 35Gy. Integral dose was lower for MURS0%, not exceeding 1.0%, compared against restrained plans. Mean leaf aperture and control point areas increased systematically, correlated negatively with increasing MURS. Absolute delta dose rate variations were least for MURS0%. MU deprived plans exhibited GAI (>93%), better than MURS0% plans. Baseline plans are superior to MU restrained plans. However, MURS20% offers equivalent and acceptable plan quality with mileage of MUs, improved GAI for complex cases. MU tool may be adopted to tailor treatment plans using PRO3. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
SU-E-T-07: 4DCT Robust Optimization for Esophageal Cancer Using Intensity Modulated Proton Therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liao, L; Department of Industrial Engineering, University of Houston, Houston, TX; Yu, J
2015-06-15
Purpose: To develop a 4DCT robust optimization method to reduce the dosimetric impact from respiratory motion in intensity modulated proton therapy (IMPT) for esophageal cancer. Methods: Four esophageal cancer patients were selected for this study. The different phases of CT from a set of 4DCT were incorporated into the worst-case dose distribution robust optimization algorithm. 4DCT robust treatment plans were designed and compared with the conventional non-robust plans. Result doses were calculated on the average and maximum inhale/exhale phases of 4DCT. Dose volume histogram (DVH) band graphic and ΔD95%, ΔD98%, ΔD5%, ΔD2% of CTV between different phases were used tomore » evaluate the robustness of the plans. Results: Compare to the IMPT plans optimized using conventional methods, the 4DCT robust IMPT plans can achieve the same quality in nominal cases, while yield a better robustness to breathing motion. The mean ΔD95%, ΔD98%, ΔD5% and ΔD2% of CTV are 6%, 3.2%, 0.9% and 1% for the robustly optimized plans vs. 16.2%, 11.8%, 1.6% and 3.3% from the conventional non-robust plans. Conclusion: A 4DCT robust optimization method was proposed for esophageal cancer using IMPT. We demonstrate that the 4DCT robust optimization can mitigate the dose deviation caused by the diaphragm motion.« less
EOS Laser Atmosphere Wind Sounder (LAWS) investigation
NASA Technical Reports Server (NTRS)
Emmitt, George D.
1991-01-01
The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'
Spitzer Mission Operation System Planning for IRAC Warm-Instrument Characterization
NASA Technical Reports Server (NTRS)
Hunt, Joseph C., Jr.; Sarrel, Marc A.; Mahoney, William A.
2010-01-01
This paper will describe how the Spitzer Mission Operations System planned and executed the characterization phase between Spitzer's cryogenic mission and its warm mission. To the largest extend possible, the execution of this phase was done with existing processing and procedures. The modifications that were made were in response to the differences of the characterization phase compared to normal phases before and after. The primary two categories of difference are: unknown date of execution due to uncertainty of knowledge of the date of helium depletion, and the short cycle time for data analysis and re-planning during execution. In addition, all of the planning and design had to be done in parallel with normal operations, and we had to transition smoothly back to normal operations following the transition. This paper will also describe the re-planning we had to do following an anomaly discovered in the first days after helium depletion.
Reed, Jennifer L.; Munafo, Jennifer Knopf; Ekstrand, Rachel; Gillespie, Gordon; Holland, Carolyn; Britto, Maria T.
2012-01-01
BACKGROUND AND OBJECTIVE: Inadequate follow-up of positive sexually transmitted infection (STI) test results is a gap in health care quality that contributes to the epidemic of STIs in adolescent women. The goal of this study was to improve our ability to contact adolescent women with positive STI test results after an emergency department visit. METHODS: We conducted an interventional quality improvement project at a pediatric emergency department. Phase 1 included plan-do-study-act cycles to test interventions such as provider education and system changes. Phase 2 was a planned experiment studying 2 interventions (study cell phone and patient activation card), using a 2 × 2 factorial design with 1 background variable and 2 replications. Outcomes were: (1) the proportion of women aged 14 to 21 years with STI testing whose confidential telephone number was documented in the electronic medical record; (2) the proportion of STI positive women successfully contacted within 7 days. RESULTS: Phase 1 interventions increased the proportion of records with a confidential number from 24% to 58% and the proportion contacted from 45% to 65%, and decreased loss to follow-up from 40% to 24%. In phase 2, the proportion contacted decreased after the electronic medical record system changed and recording of the confidential number decreased. Study interventions (patient activation card and study cell phone) had a synergistic effect on successful contact, especially when confidential numbers were less reliably documented. CONCLUSIONS: Feasible and sustainable interventions such as improved documentation of a confidential number worked synergistically to increase our ability to successfully contact adolescent women with their STI test results. PMID:22753557
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zare, Mahkameh; Lashkari, Marzieh, E-mail: m-lashkari@sina.tums.ac.ir; Ghalehtaki, Reza
2016-01-01
External radiotherapy is a standard treatment procedure for localized prostate cancer. Given the relatively high long term survival treatment complications have been brought in center of attention. In this planning study, between 2012 and 2014, CT simulation data of 90 consecutive high-risk prostate cancer patients were collected. In the first phase, all were planned for whole pelvis irradiation up to 46Gy in 23 daily fractions. In the second phase, only the prostate gland was the target of radiation. Next, the subjects were divided randomly into three groups and each received a unique 5field conformal radiation plan including Plan A (Gantrymore » angle: 0, 60, 120, 240, and 300), Plan B (Gantry angles: 0, 90, 120, 240, and 270) and Plan C (Gantry angles: 0, 60, 90, 270, and 300). The total dose was 70Gy. For each patient, the rectum, bladder, and both femoral heads were contoured as the at risk organs (OAR). From dose volume histograms, the proportional dose of PTV V100, the bladder and rectum V80 and V90 and femoral head V50 and V100 were calculated in all subjects and compared across plans. A statistically significant difference in the femoral head V50 and V100 was found between our studied 5field plans so that in Plan A (beam angles: 0, 60, 120, 240 and 300) less dose was received by both heads of femur. This study suggests that 5 field treatment planning including an anterior, two anterior oblique and two posterior oblique portals to be more proper for 3D conformal radiotherapy in order to spare femoral head with acceptable PTV coverage, and bladder and rectal doses.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chesneau, H.L.; Passman, F.J.; Daniels, D.
1995-05-01
Responding to feed-back from its retail outlet network, a major, vertically integrated petroleum company undertook to diagnose and remediate diesel and gasoline performance problems. Analysis of samples from tanks at refinery, distribution terminal and retail outlet sites established that uncontrolled microbial contamination was rampant throughout the distribution system. The company then developed and instituted a two-phase action plan. During Phase I, all tanks received corrective (shock) biocide treatment preceding mechanical tank cleaning and fuel polishing. An ongoing Phase II program currently includes routine sampling and analysis combined with periodic preventive biocide treatment. This paper describes the initial problem diagnosis, correctivemore » action plan and preventive program; recommending the Phase II program as a model for all companies involved with refining, distribution or retailing gasoline.« less
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
DOT National Transportation Integrated Search
2009-11-01
The objectives of this study are to pre-test analyze a decommissioned reinforced concrete (RC) bridge that is selected in consultation with the New York State Department of Transportation (NYSDOT), and design and plan the field tests of the bridge fo...
DOT National Transportation Integrated Search
2008-12-01
"This report is the result of a two-part study intended to provide input to WYDOTs long-term planning process for the I-80 facility. The first phase of the study involved an on-the-ground freight survey of over 2,000 truckers traveling eastbound a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Staschus, K.
1985-01-01
In this dissertation, efficient algorithms for electric-utility capacity expansion planning with renewable energy are developed. The algorithms include a deterministic phase that quickly finds a near-optimal expansion plan using derating and a linearized approximation to the time-dependent availability of nondispatchable energy sources. A probabilistic second phase needs comparatively few computer-time consuming probabilistic simulation iterations to modify this solution towards the optimal expansion plan. For the deterministic first phase, two algorithms, based on a Lagrangian Dual decomposition and a Generalized Benders Decomposition, are developed. The probabilistic second phase uses a Generalized Benders Decomposition approach. Extensive computational tests of the algorithms aremore » reported. Among the deterministic algorithms, the one based on Lagrangian Duality proves fastest. The two-phase approach is shown to save up to 80% in computing time as compared to a purely probabilistic algorithm. The algorithms are applied to determine the optimal expansion plan for the Tijuana-Mexicali subsystem of the Mexican electric utility system. A strong recommendation to push conservation programs in the desert city of Mexicali results from this implementation.« less
[Diagnostic studies in the planning process of human resources: the Central American experience].
de Canales, F; Martínez Chopen, O; Tercero Talavera, I; González, G
1987-01-01
In this paper the authors analyze various aspects of one of the essential stages in the process of planning human resources--diagnostic studies and research which will serve as a starting point. They stress the role of diagnostic personnel studies in formulating human resources policies and planning, and describe the phases to be followed in their execution, according to the results obtained in the three Central American countries (Guatemala, Honduras, and Nicaragua) in which the studies were completed. The paper concludes with a summary of the process in the three countries.
Simpson, Alan; Hannigan, Ben; Coffey, Michael; Jones, Aled; Barlow, Sally; Cohen, Rachel; Všetečková, Jitka; Faulkner, Alison; Haddad, Mark
2015-07-03
The collaborative care planning study (COCAPP) is a cross-national comparative study of care planning and coordination in community mental healthcare settings. The context and delivery of mental health care is diverging between the countries of England and Wales whilst retaining points of common interest, hence providing a rich geographical comparison for research. Across England the key vehicle for the provision of recovery-focused, personalised, collaborative mental health care is the care programme approach (CPA). The CPA is a form of case management introduced in England in 1991, then revised in 2008. In Wales the CPA was introduced in 2003 but has now been superseded by The Mental Health (Care Co-ordination and Care and Treatment Planning) (CTP) Regulations (Mental Health Measure), a new statutory framework. In both countries, the CPA/CTP requires providers to: comprehensively assess health/social care needs and risks; develop a written care plan (which may incorporate risk assessments, crisis and contingency plans, advanced directives, relapse prevention plans, etc.) in collaboration with the service user and carer(s); allocate a care coordinator; and regularly review care. The overarching aim of this study is to identify and describe the factors that ensure CPA/CTP care planning and coordination is personalised, recovery-focused and conducted collaboratively. COCAPP will employ a concurrent transformative mixed methods approach with embedded case studies. Phase 1 (Macro-level) will consider the national context through a meta-narrative mapping (MNM) review of national policies and the relevant research literature. Phase 2 (Meso-level and Micro-level) will include in-depth micro-level case studies of everyday 'frontline' practice and experience with detailed qualitative data from interviews and reviews of individual care plans. This will be nested within larger meso-level survey datasets, senior-level interviews and policy reviews in order to provide potential explanations and understanding. COCAPP will help identify the key components that support and hinder the provision of personalised, recovery-focused care planning and provide an informed rationale for a future planned intervention and evaluation.
Pringle, Janice L; Kearney, Shannon M; Grasso, Kim; Boyer, Annette D; Conklin, Mark H; Szymanski, Keith A
2015-01-01
To user-test and evaluate a performance information management platform that makes standardized, benchmarked medication use quality data available to both health plans and community pharmacy organizations. Multiple health/drug plans and multiple chain and independent pharmacies across the United States. During the first phase of the study, user experience was measured via user satisfaction surveys and interviews with key personnel (pharmacists, pharmacy leaders, and health plan leadership). Improvements were subsequently made to the platform based on these findings. During the second phase of the study, the platform was implemented in a greater number of pharmacies and by a greater number of payers. User experience was then reevaluated to gather information for further improvements. The surveys and interviews revealed that users found the Web-based platform easy to use and beneficial in terms of understanding and comparing performance metrics. Primary concerns included lack of access to real-time data and patient-specific data. Many users also expressed uncertainty as to how they could use the information and data provided by the platform. The study findings indicate that while information management platforms can be used effectively in both pharmacy and health plan settings, future development is needed to ensure that the provided data can be transferred to pharmacy best practices and improved quality care.
30 CFR 285.629 - May I develop my lease in phases?
Code of Federal Regulations, 2010 CFR
2010-07-01
... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Contents of the Construction and Operations Plan § 285.629 May I develop my lease in phases? In... operations and what portions of the lease will be reserved for subsequent phased development. ...
Child saving and child spacing in Africa: the evolution of a concept.
Wright, R D
1973-01-01
In 1963 neither the Nigerian Society of Health nor anyone in the power structure of Nigeria would publicly endorse family planning. By early 1968 a family planning day was declared where it was proclaimed that the quality of the people was important not the quantity. However Nigeria still does not have a family planning program that reaches a large percentage of the women at risk. The first phase is a quiet beginning, the second is the achievement of acceptance, the third is to train teachers, and the fourth phase is the establishment of maternal-child care services. This last phase may incorporate the family planning services. Is hoped that this will lead to a more favorable attitude toward family planning.
Lehman, Wayne E. K.; Simpson, D. Dwayne; Knight, Danica K.; Flynn, Patrick M.
2015-01-01
Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A 2-phase procedural approach is therefore presented based on the integration of TCU models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. PMID:21443294
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heijkoop, Sabrina T., E-mail: s.heijkoop@erasmusmc.nl; Langerak, Thomas R.; Quint, Sandra
Purpose: To evaluate the clinical implementation of an online adaptive plan-of-the-day protocol for nonrigid target motion management in locally advanced cervical cancer intensity modulated radiation therapy (IMRT). Methods and Materials: Each of the 64 patients had four markers implanted in the vaginal fornix to verify the position of the cervix during treatment. Full and empty bladder computed tomography (CT) scans were acquired prior to treatment to build a bladder volume-dependent cervix-uterus motion model for establishment of the plan library. In the first phase of clinical implementation, the library consisted of one IMRT plan based on a single model-predicted internal targetmore » volume (mpITV), covering the target for the whole pretreatment observed bladder volume range, and a 3D conformal radiation therapy (3DCRT) motion-robust backup plan based on the same mpITV. The planning target volume (PTV) combined the ITV and nodal clinical target volume (CTV), expanded with a 1-cm margin. In the second phase, for patients showing >2.5-cm bladder-induced cervix-uterus motion during planning, two IMRT plans were constructed, based on mpITVs for empty-to-half-full and half-full-to-full bladder. In both phases, a daily cone beam CT (CBCT) scan was acquired to first position the patient based on bony anatomy and nodal targets and then select the appropriate plan. Daily post-treatment CBCT was used to verify plan selection. Results: Twenty-four and 40 patients were included in the first and second phase, respectively. In the second phase, 11 patients had two IMRT plans. Overall, an IMRT plan was used in 82.4% of fractions. The main reasons for selecting the motion-robust backup plan were uterus outside the PTV (27.5%) and markers outside their margin (21.3%). In patients with two IMRT plans, the half-full-to-full bladder plan was selected on average in 45% of the first 12 fractions, which was reduced to 35% in the last treatment fractions. Conclusions: The implemented online adaptive plan-of-the-day protocol for locally advanced cervical cancer enables (almost) daily tissue-sparing IMRT.« less
NASA Technical Reports Server (NTRS)
Kadowaki, Naoto; Yoshimura, Naoko; Takahashi, Takashi; Yoshikawa, Makoto; Hsu, Eddie; Bergman, Larry; Bhasin, Kul; Gary, Pat
1998-01-01
The trans-Pacific high data rate (TP-HDR) satellite communications experiment was proposed at the Japan-U.S. Cooperation in Space (JUCS) Program Workshop held in Hawaii in 1993 and remote high definition video post-production was demonstrated as the first phase trial. Following the first phase, the second phase experiment is currently prepared. This paper describes the experimental network configuration, application demonstration, and performance evaluation plan of the second phase experiment.
The Children's Services Delivery System in California: Preliminary Report--Phase I.
ERIC Educational Resources Information Center
Commission on California State Government Organization and Economy, Sacramento.
Concerned because California now annually administers an estimated $5.9 billion in funding for children's services programs, the Little Hoover Commission initiated a study on the state's provision for children's services. This report, on Phase I of the study, identifies the extent of the problem in 23 findings and provides a plan of action in 15…
ERIC Educational Resources Information Center
Wilson, Arlette C.; Godwin, Norman H.
2008-01-01
The Financial Accounting Standards Board (FASB) recently issued Statement of Financial Accounting Standards No. 158 "Employers' Accounting for Defined Benefit Pension and Other Postretirement Plans" (SFAS #158). Their intent is to comprehensively reconsider the accounting for postretirement benefit plans in phases. The first phase was to provide…
Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hlohowskyj, I.; Hayse, J.; Kuperman, R.
1995-03-01
The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct anmore » ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.« less
A distributed planning concept for Space Station payload operations
NASA Technical Reports Server (NTRS)
Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey
1994-01-01
The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.
Using Supercomputers to Speed Execution of the CAISO/PLEXOS 33% RPS Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyers, C; Streitz, F; Yao, Y
2011-09-19
The study's official title is 'ISO Study of Operational Requirements and Market Impacts at 33% Renewable Portfolio Standard (RPS).' The stated objectives are twofold: (1) identifying operational requirements and resource options to reliably operate the ISO-controlled grid under a 33% RPS in 2020; and (2) inform market, planning, and policy/regulatory decisions by the ISO, state agencies, market participants, and other stakeholders. The first of these objectives requires the hourly estimates of integration requirements, measured in terms of operational ramp, load following and regulation capacity and ramp rates, as well as additional capacity to resolve operational violations. It also involves considerationmore » of other variables that affect the results, such as the impact of different mixes of renewable technologies, and the impact of forecasting error and variability. The second objective entails supporting the CPUC to identify long-term procurement planning needs, costs, and options, as well as informing other decisions made by the CPUC and state agencies. For the ISO itself this includes informing state-wide transmission planning needs for renewables up to a 33% RPS, and informing design of wholesale markets for energy and ancillary services to facilitate provision of integration capacities. The study is designed in two phases. The first (current) phase is focused on operational requirements and addressing these requirements with existing and new conventional fossil generation; for instance, gas turbines and/or combined cycle units. The second (planned) phase will address the same operational requirements with a combination of conventional fossil generation resources, new non-generation resources, and a renewable resource dispatch. There are seven different scenarios considered in the current phase: a 20% RPS reference case; four 33% RPS cases (a reference case, a high out-of-state case, a high distributed generation case, and a low load case); an alternative 27.5% RPS case; and an all-gas case (no new renewables after 2008). In addition, the CPUC is planning a new set of cases that will alter the anticipated sets of runs.« less
Study findings on evaluation of integrated family planning programme performance.
1980-01-01
In 1976 the United Nations's Economic and Social Commission for Asia and the Pacific launched a comparative study on integrated family planning programs in a number of countries in the region. In November 1979 the study directors from the participating countries meet in Bangkok to discuss the current status of the studies in their countries. The Korean and Malaysian studies were completed, the Bangladesh study was in the data collecting phase, and the Pakistani research design phase was completed. The meeting participants focused their attention on the findings and policy implications of the 2 completed studies and also discussed a number of theorectical and methodological issues which grew out of their research experience. The Malaysian study indicated that group structure, financial resources, and the frequency and quality of worker-client contact were the most significant variables determining program effectiveness. In the Korean Study, leadership, financial resources, and the frequency and quality of contact between agencies were the key variables in determining program effectiveness. In the Malaysian study there was a positive correlation between maternal and child health service performance measures and family planning service performance measures. This finding supported the contention that these 2 types of service provision are not in conflict with each other but instead serve to reinforce each other. Policy implications of the Korean study were 1) family planning should be an integral part of all community activities; 2) family planning workers should be adequately supported by financial and supply allocations; and 3) adequate record keeping and information exchange procedures should be incorporated in the programs.
NASA Technical Reports Server (NTRS)
Gordon, C. K.
1975-01-01
A preliminary design study was conducted to evaluate the suitability of the NASA 515 airplane as a flight demonstration vehicle, and to develop plans, schedules, and budget costs for fly-by-wire/active controls technology flight validation in the NASA 515 airplane. The preliminary design and planning were accomplished for two phases of flight validation.
ERIC Educational Resources Information Center
Appalachian State Univ., Boone, NC.
A report on the final phase of a self-study and planning process undertaken by Appalachian State University, North Carolina, is presented. Initiated in 1979, the effort has involved: an examination of the university's internal and external environment, the potential impact of projected societal trends and value shifts, formulation of objectives to…
SU-E-T-113: Dose Distribution Using Respiratory Signals and Machine Parameters During Treatment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Imae, T; Haga, A; Saotome, N
Purpose: Volumetric modulated arc therapy (VMAT) is a rotational intensity-modulated radiotherapy (IMRT) technique capable of acquiring projection images during treatment. Treatment plans for lung tumors using stereotactic body radiotherapy (SBRT) are calculated with planning computed tomography (CT) images only exhale phase. Purpose of this study is to evaluate dose distribution by reconstructing from only the data such as respiratory signals and machine parameters acquired during treatment. Methods: Phantom and three patients with lung tumor underwent CT scans for treatment planning. They were treated by VMAT while acquiring projection images to derive their respiratory signals and machine parameters including positions ofmore » multi leaf collimators, dose rates and integrated monitor units. The respiratory signals were divided into 4 and 10 phases and machine parameters were correlated with the divided respiratory signals based on the gantry angle. Dose distributions of each respiratory phase were calculated from plans which were reconstructed from the respiratory signals and the machine parameters during treatment. The doses at isocenter, maximum point and the centroid of target were evaluated. Results and Discussion: Dose distributions during treatment were calculated using the machine parameters and the respiratory signals detected from projection images. Maximum dose difference between plan and in treatment distribution was −1.8±0.4% at centroid of target and dose differences of evaluated points between 4 and 10 phases were no significant. Conclusion: The present method successfully evaluated dose distribution using respiratory signals and machine parameters during treatment. This method is feasible to verify the actual dose for moving target.« less
NASA Astrophysics Data System (ADS)
Perrault, Anne Marie
The purpose of this study was to examine biology teachers' perceptions of how their online information seeking practices influence their instructional planning. When teachers engage in activities to locate, evaluate, and use online information and resources, a myriad of inter-related and often inseparable consequences follows. These influences may be any combination of direct/indirect, desirable/undesirable, or anticipated/unanticipated (Rogers, 2003). This exploratory study collected baseline data regarding teachers' online practices and its influence on their practice. There were two phases of data collection in this study. Phase I was an online survey of more than seventy New York State biology teachers. The survey was intended to capture (1) a snapshot of the biology teachers' online information seeking practices during the summer and fall 2004, and (2) their perceptions regarding how their online practices influenced their instructional planning. In Phase II, ten study participants were interviewed in order to explore in greater detail the consequences of their online information seeking practices on their instructional planning. Four themes reflecting the consequences of teachers' information seeking practices emerged from the data analysis: Currency of Information; Sparking of Ideas and Gaining Personal Knowledge; Resource Management and the Role of Time; and Webs of Sharing. Each theme encompassed both the purposeful and the indirect actions by teachers to access knowledge and resources to refine and improve their instructional planning. This study's findings show that teachers are using a greater number and wider range of current and multi-modal resources than pre-Internet and they perceive this as an advantage in creating authentic, inquiry-based learning experiences. A notable discovery was of the under-use by teachers of educational online resources specifically designed to support teaching and learning activities (e.g., digital libraries, online databases, and listservs). This study's findings point to a recursive process in which teachers are engaged in ongoing online information seeking practices; continually learning and fostering new knowledge; integrating the learning into their instructional planning practices; changing their teaching strategies; and going back online to search for information and resources and begin the cycle again.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lamb, J; Lee, C; Tee, S
2014-06-15
Purpose: To investigate the accuracy of 4D dose accumulation using projection of dose calculated on the end-exhalation, mid-ventilation, or average intensity breathing phase CT scan, versus dose accumulation performed using full Monte Carlo dose recalculation on every breathing phase. Methods: Radiotherapy plans were analyzed for 10 patients with stage I-II lung cancer planned using 4D-CT. SBRT plans were optimized using the dose calculated by a commercially-available Monte Carlo algorithm on the end-exhalation 4D-CT phase. 4D dose accumulations using deformable registration were performed with a commercially available tool that projected the planned dose onto every breathing phase without recalculation, as wellmore » as with a Monte Carlo recalculation of the dose on all breathing phases. The 3D planned dose (3D-EX), the 3D dose calculated on the average intensity image (3D-AVE), and the 4D accumulations of the dose calculated on the end-exhalation phase CT (4D-PR-EX), the mid-ventilation phase CT (4D-PR-MID), and the average intensity image (4D-PR-AVE), respectively, were compared against the accumulation of the Monte Carlo dose recalculated on every phase. Plan evaluation metrics relating to target volumes and critical structures relevant for lung SBRT were analyzed. Results: Plan evaluation metrics tabulated using 4D-PR-EX, 4D-PR-MID, and 4D-PR-AVE differed from those tabulated using Monte Carlo recalculation on every phase by an average of 0.14±0.70 Gy, - 0.11±0.51 Gy, and 0.00±0.62 Gy, respectively. Deviations of between 8 and 13 Gy were observed between the 4D-MC calculations and both 3D methods for the proximal bronchial trees of 3 patients. Conclusions: 4D dose accumulation using projection without re-calculation may be sufficiently accurate compared to 4D dose accumulated from Monte Carlo recalculation on every phase, depending on institutional protocols. Use of 4D dose accumulation should be considered when evaluating normal tissue complication probabilities as well as in clinical situations where target volumes are directly inferior to mobile critical structures.« less
Computer-Based Intepretation of the Marital Satisfaction Inventory: Use in Treatment Planning.
ERIC Educational Resources Information Center
Snyder, Douglas K.; And Others
1988-01-01
Describes computer-based interpretive system for Marital Satisfaction Inventory (MSI) and application in initial phases of clinical assessment and treatment planning. Provides case study. Compares clinical findings at intake with MSI profiles for one couple obtained at termination and follow-up. Considers strengths and limitations of self-report…
DOT National Transportation Integrated Search
2009-11-06
The objectives of this study are to pre-test analyze a decommissioned RC bridge that is selected in consultation : with New York State Department of Transportation (NYSDOT), and design and plan the field tests of the bridge : for the performance qual...
Akhlaghi, Mohammad Reza; Vafamehr, Vajiheh; Dadgostarnia, Mohammad; Dehghani, Alireza
2013-01-01
In this study, by using a problem-oriented approach in the needs assessment, identifying the defects and deficiencies in emergency health training centers has been determined as the basis for the requirements. The main objective of the study was the implementation of surgical emergencies integration of the five surgical groups (general surgery, urology, orthopedics, neurosurgery, and ENT) to meet the needs and determining its efficacy. THIS INTERVENTIONAL STUDY WAS CONDUCTED IN THREE PHASES: (1) Phase I (design and planning): Needs assessment, recognition of implementation barriers and providing the objectives and training program for integrated emergencies. (2) Phase II (implementation): Justification of the main stakeholders of the project, preparation of students' duties in the emergency department, preparation of on-duty plans, supervising the implementation of the program, and reviewing the plan in parallel with the implementation based on the problems. (3) Phase III (evaluation): Reviewing the evidences based on the amount of efficiency of the plan and justification for its continuation. In the first and the second phase, the data were collected through holding focus group meetings and interviews. In the third phase, the opened-reply and closed-reply researcher-made questionnaires were used. The questionnaire face and content validity were confirmed by experts and the reliability was assessed by calculating the Cronbach's alpha. ACCORDING TO THE VIEWS OF THE INTERNS, ASSISTANTS, TEACHERS, AND EMERGENCY PERSONNEL, THE POSITIVE FEATURES OF THE PLAN INCLUDED THE FOLLOWING: Increasing the patients' satisfaction, reducing the patients' stay in the Emergency Department, increasing the speed of handling the patients, balancing the workloads of the interns, direct training of interns by young teachers of emergency medicine, giving the direct responsibility of the patient to the intern, practical and operational training of emergency issues, increasing the teamwork, facing a variety of patients, practicing the role of general practitioners, role-playing on a real patient's bedside, having a multilateral approach to the patient, reducing the wasting time on minor wards, balancing the work and rest schedules of the interns, and better learning and satisfaction of the interns. Over 60% of the participants believed the program has the following benefits: More attention on the training plan, improving the learning of patient management, being more responsive for the training of interns, increasing operational approach to emergency patients, being more aware of the performed actions, and increasing the quality and speed of services provided to patients. The mean score assigned to the whole questionnaire of investigating the viewpoints was 37.5 out of 50. The mean score of the interns' questionnaire was significantly more than the mean score of the assistants. The results obtained indicated that the greatest existing consensus about this plan was the positive impact on the learning of interns in the emergency setting. Thus, it will not only increase the number of patients who the interns are managing during the internship course, but also increases the balance of their workload and they can learn and manage the emergency patients with more leisure.
Development of the joint munitions planning system - a planning tool for the ammunition community.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hummel, J. R.; Winiecki, A. L.; Fowler, R. S.
2004-10-01
The United States Army Joint Munitions Command (JMC) is the executive agent for the Single Manager for Conventional Ammunition (SMCA). As such the JMC is responsible for the storage and transportation of all Service's SMCA as well as non-SMCA munitions. Part of the JMC mission requires that complex depot capacity studies, transportation capabilities analyses, peacetime re-allocations/ redistribution plans and time-phased deployment distribution plans be developed. Beginning in 1999 the Joint Munitions Planning System (JMPS) was developed to provide sourcing and movement solutions of ammunition for military planners.
Phase averaging method for the modeling of the multiprobe and cutaneous cryosurgery
NASA Astrophysics Data System (ADS)
E Shilnikov, K.; Kudryashov, N. A.; Y Gaiur, I.
2017-12-01
In this paper we consider the problem of planning and optimization of the cutaneous and multiprobe cryosurgery operations. An explicit scheme based on the finite volume approximation of phase averaged Pennes bioheat transfer model is applied. The flux relaxation method is used for the stability improvement of scheme. Skin tissue is considered as strongly inhomogeneous media. Computerized planning tool is tested on model cryotip-based and cutaneous cryosurgery problems. For the case of cutaneous cryosurgery the method of an additional freezing element mounting is studied as an approach to optimize the cellular necrosis front propagation.
Phase 0 study for a geothermal superheated water proof of concept facility
NASA Technical Reports Server (NTRS)
Douglass, R. H.; Pearson, R. O.
1974-01-01
A Phase 0 study for the selection of a representative liquid-dominated geothermal resource of moderate salinity and temperature is discussed. Selection and conceptual design of a nominal 10-MWe energy conversion system, and implementation planning for Phase 1: subsystem (component, experiments) and Phase 2: final design, construction, and operation of experimental research facilities are reported. The objective of the overall program is to demonstrate the technical and economic viability of utilizing moderate temperature and salinity liquid-dominated resources with acceptable environmental impact, and thus encourage commercial scale development of geothermal electrical power generation.
Herbal contraceptives: exploring indigenous methods of family planning.
Quijano Nv
1986-01-01
The study, "Herbal Contraceptives: An Alternative Strategy in Family Planning", was conducted by the Research Institute for Mindanao Culture, Xavier University, for the Population Center Foundation. The study has 2 phases: 1) phase 1 gathered information from the regional population offices on the areas where herbs are grown, and 2) phase 2 sought to obtain data on the preparation and perceived effectiveness of herbal contraceptives. Results indicate that, in most of the Philippine regions, herbal contraceptives had long been used by women in the rural areas, specifically those in the indigenous groups. The 1984 study found that many rural women in the research area preferred the Kamias drink and other herbal concoctions to the pill and other modern contraceptive methods. Among college-educated women, it was found that acceptance of contraceptives was influenced more by their religion rather than by their education. Most of the respondents said they used herbal contraceptives because they were easily obtained and were inexpensive. Generally, they considered herbal contraceptives much safer than other contraceptives methods. Some women who had been using modern family planning methods are now using herbs in delaying pregnancy; this shift is mainly due to the side effects of the modern methods. There is room for a compromise between folk practices and modern science, as in the case of herbal contraceptives.
A faculty created strategic plan for excellence in nursing education.
Evans, Connie Joan; Francis Shackell, Eileen; Jean Kerr-Wilson, Selma; Joan Doyle, Glynda; McCutcheon, Jodie Anita; Budz, Bernice
2014-02-08
Strategic planning for nursing education, when seen through a faculty lens creates a deeper, more meaningful critical analysis of effective program development. New strategies are required for academic institutions to transform their curricula to meet the needs of a dynamic healthcare and changing global environment to provide quality education for students. In this article, an evidence-informed process is presented that was progressively co-created by the faculty and facilitators. Seminal business frameworks, leadership development philosophies, and innovative interventions enabled faculty to become engaged and developed as they created a strategic plan for a future-driven nursing program. Phase One presents the process of developing a strategic plan for excellence in nursing education by leveraging faculty potential and preparing for an upcoming accreditation. In Phase Two, four team members from Phase One continue as part of Phase Two team serving as the collective memory for this initial work. This method of strategic planning encouraged faculty engagement and leadership and laid the groundwork for a positive culture change among nursing faculty.
Implementation of science process skills using ICT-based approach to facilitate student life skills
NASA Astrophysics Data System (ADS)
Rahayu, Y. S.; Yuliani; Wijaya, B. R.
2018-01-01
The purpose of this study is to describe the results of the implementation of a teaching-learning package in Plant Physiology courses to improve the student’s life skills using the science process skills-based approach ICT. This research used 15 students of Biology Education of Undergraduate International Class who are in the Plant Physiology course. This study consists of two phases items, namely the development phase and implementation phase by using a one-shot case study design. Research parameters were the feasibility of lesson plans, student achievement, Including academic skills, thinking skills, and social skills. Data were descriptively Analyzed According to the characteristics of the existing data. The result shows that the feasibility of a lesson plan is very satisfied and can be improvements in student’s life skills, especially with regards to student’s thinking skills and scientific thinking skills. The results indicate that the science process skills using ICT-based approach can be effective methods to improve student’s life skills.
NASA Technical Reports Server (NTRS)
Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V
1971-01-01
This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.
Inverse 4D conformal planning for lung SBRT using particle swarm optimization
NASA Astrophysics Data System (ADS)
Modiri, A.; Gu, X.; Hagan, A.; Bland, R.; Iyengar, P.; Timmerman, R.; Sawant, A.
2016-08-01
A critical aspect of highly potent regimens such as lung stereotactic body radiation therapy (SBRT) is to avoid collateral toxicity while achieving planning target volume (PTV) coverage. In this work, we describe four dimensional conformal radiotherapy using a highly parallelizable swarm intelligence-based stochastic optimization technique. Conventional lung CRT-SBRT uses a 4DCT to create an internal target volume and then, using forward-planning, generates a 3D conformal plan. In contrast, we investigate an inverse-planning strategy that uses 4DCT data to create a 4D conformal plan, which is optimized across the three spatial dimensions (3D) as well as time, as represented by the respiratory phase. The key idea is to use respiratory motion as an additional degree of freedom. We iteratively adjust fluence weights for all beam apertures across all respiratory phases considering OAR sparing, PTV coverage and delivery efficiency. To demonstrate proof-of-concept, five non-small-cell lung cancer SBRT patients were retrospectively studied. The 4D optimized plans achieved PTV coverage comparable to the corresponding clinically delivered plans while showing significantly superior OAR sparing ranging from 26% to 83% for D max heart, 10%-41% for D max esophagus, 31%-68% for D max spinal cord and 7%-32% for V 13 lung.
Inverse 4D conformal planning for lung SBRT using particle swarm optimization
Modiri, A; Gu, X; Hagan, A; Bland, R; Iyengar, P; Timmerman, R; Sawant, A
2016-01-01
A critical aspect of highly potent regimens such as lung stereotactic body radiation therapy (SBRT) is to avoid collateral toxicity while achieving planning target volume (PTV) coverage. In this work, we describe four dimensional conformal radiotherapy (4D CRT) using a highly parallelizable swarm intelligence-based stochastic optimization technique. Conventional lung CRT-SBRT uses a 4DCT to create an internal target volume (ITV) and then, using forward-planning, generates a 3D conformal plan. In contrast, we investigate an inverse-planning strategy that uses 4DCT data to create a 4D conformal plan, which is optimized across the three spatial dimensions (3D) as well as time, as represented by the respiratory phase. The key idea is to use respiratory motion as an additional degree of freedom. We iteratively adjust fluence weights for all beam apertures across all respiratory phases considering OAR sparing, PTV coverage and delivery efficiency. To demonstrate proof-of-concept, five non-small-cell lung cancer SBRT patients were retrospectively studied. The 4D optimized plans achieved PTV coverage comparable to the corresponding clinically delivered plans while showing significantly superior OAR sparing ranging from 26% to 83% for Dmax heart, 10% to 41% for Dmax esophagus, 31% to 68% for Dmax spinal cord and 7% to 32% for V13 lung. PMID:27476472
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Quality Assurance Project Plan (QAPjP) establishes the quality assurance procedures and requirements to be implemented for the control of quality-related activities for Phase 3 of the Treatability Study (TS) of In Situ Vitrification (ISV) of Seepage Pit 1, ORNL Waste Area Grouping 7. This QAPjP supplements the Quality Assurance Plan for Oak Ridge National Laboratory Environmental Restoration Program by providing information specific to the ISV-TS. Phase 3 of the TS involves the actual ISV melt operations and posttest monitoring of Pit 1 and vicinity. Previously, Phase 1 activities were completed, which involved determining the boundaries of Pit 1, usingmore » driven rods and pipes and mapping the distribution of radioactivity using logging tools within the pipes. Phase 2 involved sampling the contents, both liquid and solids, in and around seepage Pit 1 to determine their chemical and radionuclide composition and the spatial distribution of these attributes. A separate QAPjP was developed for each phase of the project. A readiness review of the Phase 3 activities presented QAPjP will be conducted prior to initiating field activities, and an Operational Acceptance, Test (OAT) will also be conducted with no contamination involved. After, the OAT is complete, the ISV process will be restarted, and the melt will be allowed to increase with depth and incorporate the radionuclide contamination at the bottom of Pit 1. Upon completion of melt 1, the equipment will be shut down and mobilized to an adjacent location at which melt 2 will commence.« less
Development of 3-D Ice Accretion Measurement Method
NASA Technical Reports Server (NTRS)
Lee, Sam; Broeren, Andy P.; Addy, Harold E., Jr.; Sills, Robert; Pifer, Ellen M.
2012-01-01
A research plan is currently being implemented by NASA to develop and validate the use of a commercial laser scanner to record and archive fully three-dimensional (3-D) ice shapes from an icing wind tunnel. The plan focused specifically upon measuring ice accreted in the NASA Icing Research Tunnel (IRT). The plan was divided into two phases. The first phase was the identification and selection of the laser scanning system and the post-processing software to purchase and develop further. The second phase was the implementation and validation of the selected system through a series of icing and aerodynamic tests. Phase I of the research plan has been completed. It consisted of evaluating several scanning hardware and software systems against an established selection criteria through demonstrations in the IRT. The results of Phase I showed that all of the scanning systems that were evaluated were equally capable of scanning ice shapes. The factors that differentiated the scanners were ease of use and the ability to operate in a wide range of IRT environmental conditions.
Shoji, Kotaro; Luszczynska, Aleksandra; Benight, Charles C
2018-01-01
Background There has been a growing trend in the delivery of mental health treatment via technology (ie, electronic health, eHealth). However, engagement with eHealth interventions is a concern, and theoretically based research in this area is sparse. Factors that influence engagement are poorly understood, especially in trauma survivors with symptoms of posttraumatic stress. Objective The aim of this study was to examine engagement with a trauma recovery eHealth intervention using the Health Action Process Approach theoretical model. Outcome expectancy, perceived need, pretreatment self-efficacy, and trauma symptoms influence the formation of intentions (motivational phase), followed by planning, which mediates the translation of intentions into engagement (volitional phase). We hypothesized the mediational effect of planning would be moderated by level of treatment self-efficacy. Methods Trauma survivors from around the United States used the eHealth intervention for 2 weeks. We collected baseline demographic, social cognitive predictors, and distress symptoms and measured engagement subjectively and objectively throughout the intervention. Results The motivational phase model explained 48% of the variance, and outcome expectations (beta=.36), perceived need (beta=.32), pretreatment self-efficacy (beta=.13), and trauma symptoms (beta=.21) were significant predictors of intention (N=440). In the volitional phase, results of the moderated mediation model indicated for low levels of treatment self-efficacy, planning mediated the effects of intention on levels of engagement (B=0.89, 95% CI 0.143-2.605; N=115). Conclusions Though many factors can affect engagement, these results offer a theoretical framework for understanding engagement with an eHealth intervention. This study highlighted the importance of perceived need, outcome expectations, self-efficacy, and baseline distress symptoms in the formation of intentions to use the intervention. For those low in treatment self-efficacy, planning may play an important role in the translation of intentions into engagement. Results of this study may help bring some clarification to the question of what makes eHealth interventions work. PMID:29636323
Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000
2001-04-01
Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1
DOT National Transportation Integrated Search
2017-06-01
This report summarizes the initial phase of the Personal Transportation Plan Pilot Program (PTP3). The purpose of the PTP3 initiative is to develop a personal transportation planning tool that can be used by disabled Vermonters and Vermont veterans t...
VOCATIONAL-TECHNICAL FACILITIES PROJECT. PROGRESS REPORT.
ERIC Educational Resources Information Center
CONRAD, M.J.; VALENTINE, I.E.
IN THE FIRST PHASE OF A PROJECT FOR DEVELOPING PLANNING GUIDES FOR VOCATIONAL FACILITIES, THE OVERALL DIRECTION OF A SERIES OF PLANNING GUIDES IS BEING DETERMINED. IN THE SECOND PHASE AT LEAST ONE PLANNING MANUAL WILL BE DEVELOPED TO SERVE AS A MODEL FOR THE FULL SERIES. A LOCAL WORKING GROUP COMPOSED OF THREE SPECIALISTS FROM THE CENTER FOR…
Scientific white paper on concentration-QTc modeling.
Garnett, Christine; Bonate, Peter L; Dang, Qianyu; Ferber, Georg; Huang, Dalong; Liu, Jiang; Mehrotra, Devan; Riley, Steve; Sager, Philip; Tornoe, Christoffer; Wang, Yaning
2018-06-01
The International Council for Harmonisation revised the E14 guideline through the questions and answers process to allow concentration-QTc (C-QTc) modeling to be used as the primary analysis for assessing the QTc interval prolongation risk of new drugs. A well-designed and conducted QTc assessment based on C-QTc modeling in early phase 1 studies can be an alternative approach to a thorough QT study for some drugs to reliably exclude clinically relevant QTc effects. This white paper provides recommendations on how to plan and conduct a definitive QTc assessment of a drug using C-QTc modeling in early phase clinical pharmacology and thorough QT studies. Topics included are: important study design features in a phase 1 study; modeling objectives and approach; exploratory plots; the pre-specified linear mixed effects model; general principles for model development and evaluation; and expectations for modeling analysis plans and reports. The recommendations are based on current best modeling practices, scientific literature and personal experiences of the authors. These recommendations are expected to evolve as their implementation during drug development provides additional data and with advances in analytical methodology.
Graphics simulation and training aids for advanced teleoperation
NASA Technical Reports Server (NTRS)
Kim, Won S.; Schenker, Paul S.; Bejczy, Antal K.
1993-01-01
Graphics displays can be of significant aid in accomplishing a teleoperation task throughout all three phases of off-line task analysis and planning, operator training, and online operation. In the first phase, graphics displays provide substantial aid to investigate work cell layout, motion planning with collision detection and with possible redundancy resolution, and planning for camera views. In the second phase, graphics displays can serve as very useful tools for introductory training of operators before training them on actual hardware. In the third phase, graphics displays can be used for previewing planned motions and monitoring actual motions in any desired viewing angle, or, when communication time delay prevails, for providing predictive graphics overlay on the actual camera view of the remote site to show the non-time-delayed consequences of commanded motions in real time. This paper addresses potential space applications of graphics displays in all three operational phases of advanced teleoperation. Possible applications are illustrated with techniques developed and demonstrated in the Advanced Teleoperation Laboratory at JPL. The examples described include task analysis and planning of a simulated Solar Maximum Satellite Repair task, a novel force-reflecting teleoperation simulator for operator training, and preview and predictive displays for on-line operations.
Experiences with an adaptive design for a dose-finding study in patients with osteoarthritis.
Miller, Frank; Björnsson, Marcus; Svensson, Ola; Karlsten, Rolf
2014-03-01
Dose-finding studies in non-oncology areas are usually conducted in Phase II of the development process of a new potential medicine and it is key to choose a good design for such a study, as the results will decide if and how to proceed to Phase III. The present article has focus on the design of a dose-finding study for pain in osteoarthritis patients treated with the TRPV1 antagonist AZD1386. We describe different design alternatives in the planning of this study, the reasoning for choosing the adaptive design and experiences with conduct and interim analysis. Three alternatives were proposed: one single dose-finding study with parallel design, a programme with a smaller Phase IIa study followed by a Phase IIb dose-finding study, and an adaptive dose-finding study. We describe these alternatives in detail and explain why the adaptive design was chosen for the study. We give insights in design aspects of the adaptive study, which need to be pre-planned, like interim decision criteria, statistical analysis method and setup of a Data Monitoring Committee. Based on the interim analysis it was recommended to stop the study for futility since AZD1386 showed no significant pain decrease based on the primary variable. We discuss results and experiences from the conduct of the study with the novel design approach. Huge cost savings have been done compared to if the option with one dose-finding design for Phase II had been chosen. However, we point out several challenges with this approach. Copyright © 2014 Elsevier Inc. All rights reserved.
Phase III Early Restoration Meeting | NOAA Gulf Spill Restoration
Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News Publications Press Releases Story programmatic approach to early restoration planning for Phase III and future early restoration plans. Open
Phase III Early Restoration Meeting - Corpus Christi, TX | NOAA Gulf Spill
Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News programmatic approach to early restoration planning for Phase III and future early restoration plans. Open
Phase III Early Restoration Meeting - Pensacola, FL (rescheduled) | NOAA
Restoration Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News programmatic approach to early restoration planning for Phase III and future early restoration plans. Open
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mohatt, D; Malhotra, H
Purpose: Conventional treatment plans for lung radiotherapy are created using either the free breathing (FB) scheme which represents the tumor at an arbitrary breathing phase of the patient’s respiratory cycle, or the average computed tomography (ACT) intensity projection over 10-binned phases. Neither method is entirely accurate because of the absence of time dependence of tumor movement. In the present “Hybrid” method, the HU of tumor in 3D space is determined by relative weighting of the HU of the tumor and lung in proportion to the time they spend at that location during the entire breathing cycle. Methods: A Quasar respiratorymore » motion phantom was employed to simulate lung tumor movement. Utilizing 4DCT image scans, volumetric modulated arc therapy (VMAT) plans were generated for three treatment planning scenarios which included conventional FB and ACT schemes, along with a third alternative Hybrid approach. Our internal target volume (ITV) hybrid structure was created using Boolean operation in Eclipse (ver. 11) treatment planning system, where independent sub-regions created by the gross tumor volume (GTV) overlap from the 10 motion phases were each assigned a time weighted CT value. The dose-volume-histograms (DVH) for each scheme were compared and analyzed. Results: Using our hybrid technique, we have demonstrated a reduction of 1.9% – 3.4% in total monitor units with respect to conventional treatment planning strategies, along with a 6 fold improvement in high dose spillage over the FB plan. The higher density ACT and Hybrid schemes also produced a slight enhancement in target conformity and reduction in low dose spillage. Conclusion: All treatment plans created in this study exceeded RTOG protocol criteria. Our results determine the free breathing approach yields an inaccurate account of the target treatment density. A significant decrease in unnecessary lung irradiation can be achieved by implementing Hybrid HU method with ACT method second best.« less
Statewide Transportation Needs & Funding Study
DOT National Transportation Integrated Search
1995-05-01
The State Transportation Policy Initiative (STPI)is multi-phase study to examine : current transportation planning, growth management, and transportation funding : practices in Florida and to develop recommendations that can be the basis of : future ...
NASA Technical Reports Server (NTRS)
Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas
2017-01-01
This paper describes plans and preliminary results for using the NASA Propulsion Systems Lab (PSL) to experimentally study the fundamental physics of ice-crystal ice accretion. NASA is evaluating whether this facility, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This paper presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.
NASA Technical Reports Server (NTRS)
Struk, Peter; Tsao, Jen-Ching; Bartkus, Tadas
2016-01-01
This presentation accompanies the paper titled Plans and Preliminary Results of Fundamental Studies of Ice Crystal Icing Physics in the NASA Propulsion Systems Laboratory. NASA is evaluating whether PSL, in addition to full-engine and motor-driven-rig tests, can be used for more fundamental ice-accretion studies that simulate the different mixed-phase icing conditions along the core flow passage of a turbo-fan engine compressor. The data from such fundamental accretion tests will be used to help develop and validate models of the accretion process. This presentation (and accompanying paper) presents data from some preliminary testing performed in May 2015 which examined how a mixed-phase cloud could be generated at PSL using evaporative cooling in a warmer-than-freezing environment.
A community-based integrated nutrition research programme to alleviate poverty: baseline survey.
Oldewage-Theron, W H; Dicks, E G; Napier, C E; Rutengwe, R
2005-04-01
The United Nation's Children Fund (UNICEF) has indicated that urban poverty is primarily found in squatter settlements. At present, 13.5% of all South African households live in informal settlements. The main hypothesis for this empirical study was that micromechanisms would not negatively influence food, nutrition and health of residents in an informal settlement in the Vaal Triangle, South Africa. This hypothesis was tested empirically against the UNICEF framework of the immediate, underlying and basic causes of malnutrition. The purpose of this study was to establish a situation analysis of children and women before designing any intervention. The objectives covered in this paper include Phases I and II of the project, namely planning of the project and determining the demographic and health profile of the sample as part of a situation analysis. This is a community participatory project. After a strategic participatory planning workshop with stakeholders, a plan of operation document, guiding all field undertakings, was drawn up (Phase 1), followed by a cross-sectional baseline survey (Phase II), situation analysis (Phase III), and implementation of community-based intervention studies (Phase IV). Impact measurement will follow in Phase V. After the planning meeting and obtaining consent, a pretested, structured demographic and health questionnaire was used to obtain data from 357 randomly selected households in an informal settlement. Data were statistically analysed for means and standard deviations. The findings of the workshop evaluation indicated that 100% of the participants (n = 34) agreed that a need existed for this project, 74% (n = 24) understood the relevance, and 64% (n = 22) realized the importance for sustainable community development. In the baseline survey, 89% of the respondents lived in zinc shacks with two rooms or less (32.2%), three or four rooms (41.5%) or four rooms or more (26.3%). The household size was six people or more (33%), five people (18.5%), four people (21.3%) and three people or less (27.2%). The unemployment rate was 94.2% for respondents and 80.1% for their partners. The majority of households (42.6%) had a monthly income of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoon, Jihyung; Jung, Jae Won, E-mail: jungj@ecu.ed
Purpose: A method is proposed to reconstruct a four-dimensional (4D) dose distribution using phase matching of measured cine images to precalculated images of electronic portal imaging device (EPID). Methods: (1) A phantom, designed to simulate a tumor in lung (a polystyrene block with a 3 cm diameter embedded in cork), was placed on a sinusoidally moving platform with an amplitude of 1 cm and a period of 4 s. Ten-phase 4D computed tomography (CT) images of the phantom were acquired. A planning target volume (PTV) was created by adding a margin of 1 cm around the internal target volume ofmore » the tumor. (2) Three beams were designed, which included a static beam, a theoretical dynamic beam, and a planning-optimized dynamic beam (PODB). While the theoretical beam was made by manually programming a simplistic sliding leaf motion, the planning-optimized beam was obtained from treatment planning. From the three beams, three-dimensional (3D) doses on the phantom were calculated; 4D dose was calculated by means of the ten phase images (integrated over phases afterward); serving as “reference” images, phase-specific EPID dose images under the lung phantom were also calculated for each of the ten phases. (3) Cine EPID images were acquired while the beams were irradiated to the moving phantom. (4) Each cine image was phase-matched to a phase-specific CT image at which common irradiation occurred by intercomparing the cine image with the reference images. (5) Each cine image was used to reconstruct dose in the phase-matched CT image, and the reconstructed doses were summed over all phases. (6) The summation was compared with forwardly calculated 4D and 3D dose distributions. Accounting for realistic situations, intratreatment breathing irregularity was simulated by assuming an amplitude of 0.5 cm for the phantom during a portion of breathing trace in which the phase matching could not be performed. Intertreatment breathing irregularity between the time of treatment and the time of planning CT was considered by utilizing the same reduced amplitude when the phantom was irradiated. To examine the phase matching in a humanoid environment, the matching was also performed in a digital phantom (4D XCAT phantom). Results: For the static, the theoretical, and the planning-optimized dynamic beams, the 4D reconstructed doses showed agreement with the forwardly calculated 4D doses within the gamma pass rates of 92.7%, 100%, and 98.1%, respectively, at the isocenter plane given by 3%/3 mm criteria. Excellent agreement in dose volume histogram of PTV and lung-PTV was also found between the two 4D doses, while substantial differences were found between the 3D and the 4D doses. The significant breathing irregularities modeled in this study were found not to be noticeably affecting the reconstructed dose. The phase matching was performed equally well in a digital phantom. Conclusions: The method of retrospective phase determination of a moving object under irradiation provided successful 4D dose reconstruction. This method will provide accurate quality assurance and facilitate adaptive therapy when distinguishable objects such as well-defined tumors, diaphragm, and organs with markers (pancreas and liver) are covered by treatment beam apertures.« less
Yoon, Jihyung; Jung, Jae Won; Kim, Jong Oh; Yi, Byong Yong; Yeo, Inhwan
2016-07-01
A method is proposed to reconstruct a four-dimensional (4D) dose distribution using phase matching of measured cine images to precalculated images of electronic portal imaging device (EPID). (1) A phantom, designed to simulate a tumor in lung (a polystyrene block with a 3 cm diameter embedded in cork), was placed on a sinusoidally moving platform with an amplitude of 1 cm and a period of 4 s. Ten-phase 4D computed tomography (CT) images of the phantom were acquired. A planning target volume (PTV) was created by adding a margin of 1 cm around the internal target volume of the tumor. (2) Three beams were designed, which included a static beam, a theoretical dynamic beam, and a planning-optimized dynamic beam (PODB). While the theoretical beam was made by manually programming a simplistic sliding leaf motion, the planning-optimized beam was obtained from treatment planning. From the three beams, three-dimensional (3D) doses on the phantom were calculated; 4D dose was calculated by means of the ten phase images (integrated over phases afterward); serving as "reference" images, phase-specific EPID dose images under the lung phantom were also calculated for each of the ten phases. (3) Cine EPID images were acquired while the beams were irradiated to the moving phantom. (4) Each cine image was phase-matched to a phase-specific CT image at which common irradiation occurred by intercomparing the cine image with the reference images. (5) Each cine image was used to reconstruct dose in the phase-matched CT image, and the reconstructed doses were summed over all phases. (6) The summation was compared with forwardly calculated 4D and 3D dose distributions. Accounting for realistic situations, intratreatment breathing irregularity was simulated by assuming an amplitude of 0.5 cm for the phantom during a portion of breathing trace in which the phase matching could not be performed. Intertreatment breathing irregularity between the time of treatment and the time of planning CT was considered by utilizing the same reduced amplitude when the phantom was irradiated. To examine the phase matching in a humanoid environment, the matching was also performed in a digital phantom (4D XCAT phantom). For the static, the theoretical, and the planning-optimized dynamic beams, the 4D reconstructed doses showed agreement with the forwardly calculated 4D doses within the gamma pass rates of 92.7%, 100%, and 98.1%, respectively, at the isocenter plane given by 3%/3 mm criteria. Excellent agreement in dose volume histogram of PTV and lung-PTV was also found between the two 4D doses, while substantial differences were found between the 3D and the 4D doses. The significant breathing irregularities modeled in this study were found not to be noticeably affecting the reconstructed dose. The phase matching was performed equally well in a digital phantom. The method of retrospective phase determination of a moving object under irradiation provided successful 4D dose reconstruction. This method will provide accurate quality assurance and facilitate adaptive therapy when distinguishable objects such as well-defined tumors, diaphragm, and organs with markers (pancreas and liver) are covered by treatment beam apertures.
Ritz, Ludivine; Segobin, Shailendra; Le Berre, Anne Pascale; Lannuzel, Coralie; Boudehent, Céline; Vabret, François; Eustache, Francis; Pitel, Anne Lise; Beaunieux, Hélène
2014-08-01
Procedural learning allows for the acquisition of new behavioral skills. Previous studies have shown that chronic alcoholism is characterized by impaired cognitive procedural learning and brain abnormalities affecting regions that are involved in the automation of new cognitive procedures in healthy individuals. The goal of the present study was to investigate the brain structural substrates of cognitive procedural learning in alcoholic patients (ALs) early in abstinence. Thirty-one ALs and 31 control participants (NCs) performed the Tower of Toronto task (4 daily learning sessions, each comprising 10 trials) to assess cognitive procedural learning. We also assessed episodic and working memory, executive functions, and visuospatial abilities. ALs underwent 1.5T structural magnetic resonance imaging. The initial cognitive phase was longer in the AL group than in the NC group, whereas the autonomous phase was shorter. In ALs, the longer cognitive phase was predicted by poorer planning and visuospatial working memory abilities, and by smaller gray matter (GM) volumes in the angular gyrus and caudate nucleus. ALs' planning abilities correlated with smaller GM volume in the angular gyrus. Cognitive procedural learning was impaired in ALs, with a delayed transition from the cognitive to the autonomous phase. This slowdown in the automation of the cognitive procedure was related to lower planning abilities, which may have hampered the initial generation of the procedure to be learned. In agreement with this neuropsychological finding, a persistent relationship was found between learning performance and the GM volumes of the angular gyrus and caudate nucleus, which are usually regarded as markers of planning and initial learning of the cognitive procedure. Copyright © 2014 by the Research Society on Alcoholism.
Ritz, Ludivine; Segobin, Shailendra; Le Berre, Anne Pascale; Lannuzel, Coralie; Boudehent, Céline; Vabret, François; Eustache, Francis; Pitel, Anne Lise; Beaunieux, Hélène
2014-01-01
Background Procedural learning allows for the acquisition of new behavioral skills. Previous studies have shown that chronic alcoholism is characterized by impaired cognitive procedural learning and brain abnormalities affecting regions that are involved in the automation of new cognitive procedures in healthy individuals. The goal of the present study was to investigate the brain structural substrates of cognitive procedural learning in alcoholic patients (ALs) early in abstinence. Methods Thirty-one ALs and 31 control participants (NCs) performed the Tower of Toronto task (4 daily learning sessions, each comprising 10 trials) to assess cognitive procedural learning. We also assessed episodic and working memory, executive functions, and visuospatial abilities. ALs underwent 1.5T structural magnetic resonance imaging. Results The initial cognitive phase was longer in the AL group than in the NC group, whereas the autonomous phase was shorter. In ALs, the longer cognitive phase was predicted by poorer planning and visuospatial working memory abilities, and by smaller gray matter (GM) volumes in the angular gyrus and caudate nucleus. ALs’ planning abilities correlated with smaller GM volume in the angular gyrus. Conclusions Cognitive procedural learning was impaired in ALs, with a delayed transition from the cognitive to the autonomous phase. This slowdown in the automation of the cognitive procedure was related to lower planning abilities, which may have hampered the initial generation of the procedure to be learned. In agreement with this neuropsychological finding, a persistent relationship was found between learning performance and the GM volumes of the angular gyrus and caudate nucleus, which are usually regarded as markers of planning and initial learning of the cognitive procedure. PMID:25156613
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kauweloa, Kevin I., E-mail: Kauweloa@livemail.uthscsa.edu; Gutierrez, Alonso N.; Bergamo, Angelo
2014-07-15
Purpose: There is a growing interest in the radiation oncology community to use the biological effective dose (BED) rather than the physical dose (PD) in treatment plan evaluation and optimization due to its stronger correlation with radiobiological effects. Radiotherapy patients may receive treatments involving a single only phase or multiple phases (e.g., primary and boost). Since most treatment planning systems cannot calculate the analytical BED distribution in multiphase treatments, an approximate multiphase BED expression, which is based on the total physical dose distribution, has been used. The purpose of this paper is to reveal the mathematical properties of the approximatemore » BED formulation, relative to the true BED. Methods: The mathematical properties of the approximate multiphase BED equation are analyzed and evaluated. In order to better understand the accuracy of the approximate multiphase BED equation, the true multiphase BED equation was derived and the mathematical differences between the true and approximate multiphase BED equations were determined. The magnitude of its inaccuracies under common clinical circumstances was also studied. All calculations were performed on a voxel-by-voxel basis using the three-dimensional dose matrices. Results: Results showed that the approximate multiphase BED equation is accurate only when the dose-per-fractions (DPFs) in both the first and second phases are equal, which occur when the dose distribution does not significantly change between the phases. In the case of heterogeneous dose distributions, which significantly vary between the phases, there are fewer occurrences of equal DPFs and hence the inaccuracy of the approximate multiphase BED is greater. These characteristics are usually seen in the dose distributions being delivered to organs at risk rather than to targets. Conclusions: The finding of this study indicates that the true multiphase BED equation should be implemented in the treatment planning systems due to the inconsistent accuracy of the approximate multiphase BED equation in most of the clinical situations.« less
Procedures For Continuing Metropolitan Planning: Final Research Report
DOT National Transportation Integrated Search
1974-01-01
This report marks the conclusion of the third phase of the : Metropolitan Plan Evaluation Project. Findings of both phases two : and three are summarized here. More detailed and technical results : have been reported previously. : The continuing metr...
Phase III Early Restoration Meeting - Lake Charles, LA | NOAA Gulf Spill
Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News early restoration planning for Phase III and future early restoration plans. Open House: 5:30pm Public
E.E.C. 2000: A Study of Environmental Education Centers. Part I and Parts II & III.
ERIC Educational Resources Information Center
Minnesota State Dept. of Natural Resources, St. Paul.
This report of Environmental Education Centers (EECs) presents recommendations development of long range plans for the development and program coordination of EECs in Minnesota. The plan focuses on identifying programming needs, geographic areas to locate facilities, and capital costs for development and creation of a phased-in implementation…
Study of solid rocket motors for a space shuttle booster. Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
Vonderesch, A. H.
1972-01-01
Plans for conducting Phase C/D for a solid rocket motor booster vehicle are presented. Methods for conducting this program with details of scheduling, testing, and program management and control are included. The requirements of the space shuttle program to deliver a minimum cost/maximum reliability booster vehicle are examined.
New York State Appalachian Resource Studies; Recreation and Culture, Phase I: Inventory.
ERIC Educational Resources Information Center
Williams, Henry G., Jr.; Belden, William M.
On August 18, 1965, some 13 counties of southern New York State were declared eligible for participation in the Appalachian Regional Development Program. Another county was added in 1967. Initial state responsibility of the Office of Planning Coordination centered on formulation of a comprehensive development plan for the 11,858-square-mile…
Place and Role of Music Education in the Planned Curriculum for Kindergartens
ERIC Educational Resources Information Center
Denac, Olga
2009-01-01
This article presents the results of a research study involving 159 preschool teachers from across Slovenia. The goal of the first phase of the research, the results of which were obtained through a questionnaire sent to preschool teachers, was to establish the difficulties preschool teachers face during curricular planning. The results of the…
ALS rocket engine combustion devices design and demonstration
NASA Technical Reports Server (NTRS)
Arreguin, Steve
1989-01-01
Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.
Li, Haisen S; Zhong, Hualiang; Kim, Jinkoo; Glide-Hurst, Carri; Gulam, Misbah; Nurushev, Teamour S; Chetty, Indrin J
2014-01-06
The direct dose mapping (DDM) and energy/mass transfer (EMT) mapping are two essential algorithms for accumulating the dose from different anatomic phases to the reference phase when there is organ motion or tumor/tissue deformation during the delivery of radiation therapy. DDM is based on interpolation of the dose values from one dose grid to another and thus lacks rigor in defining the dose when there are multiple dose values mapped to one dose voxel in the reference phase due to tissue/tumor deformation. On the other hand, EMT counts the total energy and mass transferred to each voxel in the reference phase and calculates the dose by dividing the energy by mass. Therefore it is based on fundamentally sound physics principles. In this study, we implemented the two algorithms and integrated them within the Eclipse treatment planning system. We then compared the clinical dosimetric difference between the two algorithms for ten lung cancer patients receiving stereotactic radiosurgery treatment, by accumulating the delivered dose to the end-of-exhale (EE) phase. Specifically, the respiratory period was divided into ten phases and the dose to each phase was calculated and mapped to the EE phase and then accumulated. The displacement vector field generated by Demons-based registration of the source and reference images was used to transfer the dose and energy. The DDM and EMT algorithms produced noticeably different cumulative dose in the regions with sharp mass density variations and/or high dose gradients. For the planning target volume (PTV) and internal target volume (ITV) minimum dose, the difference was up to 11% and 4% respectively. This suggests that DDM might not be adequate for obtaining an accurate dose distribution of the cumulative plan, instead, EMT should be considered.
NASA Astrophysics Data System (ADS)
Li, Haisen S.; Zhong, Hualiang; Kim, Jinkoo; Glide-Hurst, Carri; Gulam, Misbah; Nurushev, Teamour S.; Chetty, Indrin J.
2014-01-01
The direct dose mapping (DDM) and energy/mass transfer (EMT) mapping are two essential algorithms for accumulating the dose from different anatomic phases to the reference phase when there is organ motion or tumor/tissue deformation during the delivery of radiation therapy. DDM is based on interpolation of the dose values from one dose grid to another and thus lacks rigor in defining the dose when there are multiple dose values mapped to one dose voxel in the reference phase due to tissue/tumor deformation. On the other hand, EMT counts the total energy and mass transferred to each voxel in the reference phase and calculates the dose by dividing the energy by mass. Therefore it is based on fundamentally sound physics principles. In this study, we implemented the two algorithms and integrated them within the Eclipse treatment planning system. We then compared the clinical dosimetric difference between the two algorithms for ten lung cancer patients receiving stereotactic radiosurgery treatment, by accumulating the delivered dose to the end-of-exhale (EE) phase. Specifically, the respiratory period was divided into ten phases and the dose to each phase was calculated and mapped to the EE phase and then accumulated. The displacement vector field generated by Demons-based registration of the source and reference images was used to transfer the dose and energy. The DDM and EMT algorithms produced noticeably different cumulative dose in the regions with sharp mass density variations and/or high dose gradients. For the planning target volume (PTV) and internal target volume (ITV) minimum dose, the difference was up to 11% and 4% respectively. This suggests that DDM might not be adequate for obtaining an accurate dose distribution of the cumulative plan, instead, EMT should be considered.
45 CFR 162.1203 - Operating rules for eligibility for a health plan transaction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... plan transaction: (1) Phase I CORE 152: Eligibility and Benefit Real Time Companion Guide Rule, version... § 162.920). (5) Phase I CORE 156: Eligibility and Benefits Real Time Response Rule, version 1.1.0, March... 45 Public Welfare 1 2011-10-01 2011-10-01 false Operating rules for eligibility for a health plan...
45 CFR 162.1203 - Operating rules for eligibility for a health plan transaction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... plan transaction: (1) Phase I CORE 152: Eligibility and Benefit Real Time Companion Guide Rule, version... § 162.920). (5) Phase I CORE 156: Eligibility and Benefits Real Time Response Rule, version 1.1.0, March... 45 Public Welfare 1 2013-10-01 2013-10-01 false Operating rules for eligibility for a health plan...
45 CFR 162.1203 - Operating rules for eligibility for a health plan transaction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... plan transaction: (1) Phase I CORE 152: Eligibility and Benefit Real Time Companion Guide Rule, version... § 162.920). (5) Phase I CORE 156: Eligibility and Benefits Real Time Response Rule, version 1.1.0, March... 45 Public Welfare 1 2014-10-01 2014-10-01 false Operating rules for eligibility for a health plan...
45 CFR 162.1203 - Operating rules for eligibility for a health plan transaction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... plan transaction: (1) Phase I CORE 152: Eligibility and Benefit Real Time Companion Guide Rule, version... § 162.920). (5) Phase I CORE 156: Eligibility and Benefits Real Time Response Rule, version 1.1.0, March... 45 Public Welfare 1 2012-10-01 2012-10-01 false Operating rules for eligibility for a health plan...
Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.
1982-04-01
Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975
Doyle, Rose Marie
2004-09-01
Planning an international practice experience for nursing students is a challenging, but rewarding, opportunity. Kwantlen University College faculty members' experience of planning for 8 Bachelor of Science in Nursing students to study abroad was no exception. Faculty members' and students' interest prompted a request for a placement in Nepal. The faculty members involved in the planning were dedicated to using a process that would enable them to remain true to the program philosophy and theoretical underpinnings throughout the entire experience, from the planning phase to the follow-up presentation. Using Wheatley's theory, the students and faculty members reexamined their personal leadership styles to ensure they remained relationship focused, rather than task focused. Wheatley maintained that because the potentiality lies in building strong relationships, it is important to support the creative power that lies in those involved in a project. This article describes new science leadership and relates it to the planning phase for the practice experience in Nepal. Then, reflections on how the philosophy of the program may have influenced the experience are shared. Finally, critical reflection on using this theory in nursing education is presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, S; Zhu, X; Zhang, M
Purpose: Randomness in patient internal organ motion phase at the beginning of non-gated radiotherapy delivery may introduce uncertainty to dose received by the patient. Concerns of this dose deviation from the planned one has motivated many researchers to study this phenomenon although unified theoretical framework for computing it is still missing. This study was conducted to develop such framework for analyzing the effect. Methods: Two reasonable assumptions were made: a) patient internal organ motion is stationary and periodic; b) no special arrangement is made to start a non -gated radiotherapy delivery at any specific phase of patient internal organ motion.more » A statistical ensemble was formed consisting of patient’s non-gated radiotherapy deliveries at all equally possible initial organ motion phases. To characterize the patient received dose, statistical ensemble average method is employed to derive formulae for two variables: expected value and variance of dose received by a patient internal point from a non-gated radiotherapy delivery. Fourier Series was utilized to facilitate our analysis. Results: According to our formulae, the two variables can be computed from non-gated radiotherapy generated dose rate time sequences at the point’s corresponding locations on fixed phase 3D CT images sampled evenly in time over one patient internal organ motion period. The expected value of point dose is simply the average of the doses to the point’s corresponding locations on the fixed phase CT images. The variance can be determined by time integration in terms of Fourier Series coefficients of the dose rate time sequences on the same fixed phase 3D CT images. Conclusion: Given a non-gated radiotherapy delivery plan and patient’s 4D CT study, our novel approach can predict the expected value and variance of patient radiation dose. We expect it to play a significant role in determining both quality and robustness of patient non-gated radiotherapy plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, L; Zhang, Y; Harris, W
2015-06-15
Purpose: To develop an automatic markerless 4D-CBCT projection sorting technique by using a patient respiratory motion model extracted from the planning 4D-CT images. Methods: Each phase of onboard 4D-CBCT is considered as a deformation of one phase of the prior planning 4D-CT. The deformation field map (DFM) is represented as a linear combination of three major deformation patterns extracted from the planning 4D-CT using principle component analysis (PCA). The coefficients of the PCA deformation patterns are solved by matching the digitally reconstructed radiograph (DRR) of the deformed volume to the onboard projection acquired. The PCA coefficients are solved for eachmore » single projection, and are used for phase sorting. Projections at the peaks of the Z direction coefficient are sorted as phase 1 and other projections are assigned into 10 phase bins by dividing phases equally between peaks. The 4D digital extended-cardiac-torso (XCAT) phantom was used to evaluate the proposed technique. Three scenarios were simulated, with different tumor motion amplitude (3cm to 2cm), tumor spatial shift (8mm SI), and tumor body motion phase shift (2 phases) from prior to on-board images. Projections were simulated over 180 degree scan-angle for the 4D-XCAT. The percentage of accurately binned projections across entire dataset was calculated to represent the phase sorting accuracy. Results: With a changed tumor motion amplitude from 3cm to 2cm, markerless phase sorting accuracy was 100%. With a tumor phase shift of 2 phases w.r.t. body motion, the phase sorting accuracy was 100%. With a tumor spatial shift of 8mm in SI direction, phase sorting accuracy was 86.1%. Conclusion: The XCAT phantom simulation results demonstrated that it is feasible to use prior knowledge and motion modeling technique to achieve markerless 4D-CBCT phase sorting. National Institutes of Health Grant No. R01-CA184173 Varian Medical System.« less
Assessing validity of observational intervention studies - the Benchmarking Controlled Trials.
Malmivaara, Antti
2016-09-01
Benchmarking Controlled Trial (BCT) is a concept which covers all observational studies aiming to assess impact of interventions or health care system features to patients and populations. To create and pilot test a checklist for appraising methodological validity of a BCT. The checklist was created by extracting the most essential elements from the comprehensive set of criteria in the previous paper on BCTs. Also checklists and scientific papers on observational studies and respective systematic reviews were utilized. Ten BCTs published in the Lancet and in the New England Journal of Medicine were used to assess feasibility of the created checklist. The appraised studies seem to have several methodological limitations, some of which could be avoided in planning, conducting and reporting phases of the studies. The checklist can be used for planning, conducting, reporting, reviewing, and critical reading of observational intervention studies. However, the piloted checklist should be validated in further studies. Key messages Benchmarking Controlled Trial (BCT) is a concept which covers all observational studies aiming to assess impact of interventions or health care system features to patients and populations. This paper presents a checklist for appraising methodological validity of BCTs and pilot-tests the checklist with ten BCTs published in leading medical journals. The appraised studies seem to have several methodological limitations, some of which could be avoided in planning, conducting and reporting phases of the studies. The checklist can be used for planning, conducting, reporting, reviewing, and critical reading of observational intervention studies.
Hood River and Pelton Ladder Evaluation Studies : Annual Report 1994.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olsen, Erik A.; French, Rod A.; Ritchey, Alan D.
1995-09-01
In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, amore » monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program`s impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
This report presents the technical findings of Phase I of Argonne’s studies. The Phase I field investigation was initiated on October 18, 2010. The work was conducted in accord with (1) the final site-specific Phase I Work Plan for Montgomery City (Argonne 2010; approved by the MDNR [2010]); (2) applicable Missouri regulations; and (3) the standard operating procedures, quality assurance/quality control (QA/QC) measures, and general health and safety policies outlined in the Master Work Plan (Argonne 2002) for operations in Kansas, which was reviewed by the MDNR and accepted for current use. A draft master plan specific to work inmore » Missouri and a set of draft standard operating procedures are in review with the MDNR. The site-specific Work Plan for Montgomery City (Argonne 2010) (1) summarizes the pre-existing knowledge base for the Montgomery City investigation site compiled by Argonne and (2) describes the site-specific technical objectives and the intended scope of work developed for the first phase of the investigation. Three primary technical objectives were identified for the Phase I studies, as follows: 1. Update the presently identified inventory and status of private and public drinking water wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for volatile organic compounds (VOCs) and geochemical analyses. In conjunction with this effort, determine the present sources(s) of drinking water for all residents in an approximate 0.5-mi radius of the former CCC/USDA facility. 2. Investigate for possible evidence of a soil source of carbon tetrachloride contamination in the unconsolidated sediments beneath the former CCC/USDA facility that might affect the underlying bedrock aquifer units. 3. Obtain preliminary information on the site-specific lithologic and hydrologic characteristics of the unconsolidated sediments overlying bedrock at the former CCC/USDA grain storage location. Section 2 of this report describes the investigative methods used in the 2010-2011 studies and provides a chronological summary of the field events conducted. Section 3 presents a summary of the resulting field and laboratory data. These data, together with information presented in the site-specific Work Plan (Argonne 2010), are interpreted and integrated in Section 4 to (1) develop a preliminary conceptual model of the hydrogeologic framework affecting groundwater and potential contaminant migration in the vicinity of the former CCC/USDA facility and (2) serve as a basis for the initial consideration of contaminant levels and potential exposure pathways that might be of concern in the evaluation of risks to human health, public welfare, and the environment. The working conclusions drawn from the 2010-2011 studies are presented, along with recommendations, in Section 5.« less
Design concerns of room and pillar retreat panels
Klemetti, Ted M.; Sears, Morgan M.; Tulu, Ihsan B.
2017-01-01
Why do some room and pillar retreat panels encounter abnormal conditions? What factors deserve the most consideration during the planning and execution phases of mining and what can be done to mitigate those abnormal conditions when they are encountered? To help answer these questions, and to determine some of the relevant factors influencing the conditions of room and pillar (R & P) retreat mining entries, four consecutive R & P retreat panels were evaluated. This evaluation was intended to reinforce the influence of topographic changes, depth of cover, multiple-seam interactions, geological conditions, and mining geometry. This paper details observations were made in four consecutive R & P retreat panels and the data were collected from an instrumentation site during retreat mining. The primary focus was on the differences observed among the four panels and within the panels themselves. The instrumentation study was initially planned to evaluate the interactions between primary and secondary support, but produced rather interesting results relating to the loading encountered under the current mining conditions. In addition to the observation and instrumentation, numerical modeling was performed to evaluate the stress conditions. Both the LaModel 3.0 and Rocscience Phase 2 programs were used to evaluate these four panels. The results of both models indicated a drastic reduction in the vertical stresses experienced in these panels due to the full extraction mining in overlying seams when compared to the full overburden load. Both models showed a higher level of stress associated with the outside entries of the panels. These results agree quite well with the observations and instrumentation studies performed at the mine. These efforts provided two overarching conclusions concerning R & P retreat mine planning and execution. The first was that there are four areas that should not be overlooked during R & P retreat mining: topographic relief, multiple-seam stress relief, stress concentrations near the gob edge, and geologic changes in the immediate roof. The second is that in order to successfully retreat an R & P panel, a three-phased approach to the design and analysis of the panel should be conducted: the planning phase, evaluation phase, and monitoring phase. PMID:28626598
An operational model for mainstreaming ecosystem services for implementation
Cowling, Richard M.; Egoh, Benis; Knight, Andrew T.; O'Farrell, Patrick J.; Reyers, Belinda; Rouget, Mathieu; Roux, Dirk J.; Welz, Adam; Wilhelm-Rechman, Angelika
2008-01-01
Research on ecosystem services has grown markedly in recent years. However, few studies are embedded in a social process designed to ensure effective management of ecosystem services. Most research has focused only on biophysical and valuation assessments of putative services. As a mission-oriented discipline, ecosystem service research should be user-inspired and user-useful, which will require that researchers respond to stakeholder needs from the outset and collaborate with them in strategy development and implementation. Here we provide a pragmatic operational model for achieving the safeguarding of ecosystem services. The model comprises three phases: assessment, planning, and management. Outcomes of social, biophysical, and valuation assessments are used to identify opportunities and constraints for implementation. The latter then are transformed into user-friendly products to identify, with stakeholders, strategic objectives for implementation (the planning phase). The management phase undertakes and coordinates actions that achieve the protection of ecosystem services and ensure the flow of these services to beneficiaries. This outcome is achieved via mainstreaming, or incorporating the safeguarding of ecosystem services into the policies and practices of sectors that deal with land- and water-use planning. Management needs to be adaptive and should be institutionalized in a suite of learning organizations that are representative of the sectors that are concerned with decision-making and planning. By following the phases of our operational model, projects for safeguarding ecosystem services are likely to empower stakeholders to implement effective on-the-ground management that will achieve resilience of the corresponding social-ecological systems. PMID:18621695
Knee mechanics during planned and unplanned sidestepping: a systematic review and meta-analysis.
Brown, Scott R; Brughelli, Matt; Hume, Patria A
2014-11-01
Knee joint mechanics during sidestepping are associated with anterior cruciate ligament injury. Unplanned sidestepping more closely emulates game scenarios when compared with planned sidestepping by limiting decision time, increasing knee loading and challenging the integrity of soft-tissue structures in the knee. It is important to quantify the loads that may challenge the integrity of the knee during planned and unplanned sidestepping. Our objective was to review literature on knee mechanics during planned and unplanned phases of sidestepping. PubMed, CINAHL, MEDLINE (EBSCO), SPORTDiscus and Web of Science were searched using the terms knee mechanics OR knee kine*, AND plan*, unplan*, anticipat*, unanticipat*, side*, cut* or chang*. A systematic approach was used to evaluate 4,629 records. Records were excluded when not available in English, only available in abstract of conference proceedings, not involving a change-of-direction sidestep, not comparing planned and unplanned or maintaining a running velocity greater than 2 m s(−1). Included studies were evaluated independently by two authors using a custom-designed methodological quality assessment derived from the Physiotherapy Evidence Database (PEDro) scale and then confirmed by a third author. Only six studies met the inclusion criteria and were retained for meta-analysis. Magnitude-based inferences were used to assess the standardised effect of the differences between planned and unplanned sidestepping. Knee angles and knee moments were extracted and reported for flexion/extension, abduction/adduction and internal/external rotation for initial contact, weight acceptance, peak push-off and final push-off phases of sidestepping. For kinematic variables, unplanned sidestepping produced a wide range of small to large increases in knee extension angles, small and moderate increases in knee abduction angles and a small increase in internal rotation angle relative to planned sidestepping during the sidestepping manoeuvre. For kinetic variables, unplanned sidestepping produced mostly small (small to large) increases in knee flexor moments, small to moderate increases in knee abductor moments and mostly moderate (small to large) increases in internal rotator moments relative to planned sidestepping. Approach velocity constraints during the sidestepping manoeuvre were lifted due to the low number of eligible studies. The varying approach velocities included (ranging from 3.0 to 5.5 m s(−1)) may impact the kinematic and kinetic variables examined in this review. Differences in knee mechanics between planned and unplanned sidestepping exist. The most substantial effects occurred during the weight acceptance phase of sidestepping. It seems that biomechanical factors commonly associated with anterior cruciate ligament injury risk are affected the most during the loading phase compared with peak push-off; made evident in the coronal (abductor) and transverse (internal rotator) knee kinetic data presented in this review. The authors of this review propose a rationale for the incorporation of unplanned sport tasks in the development of anterior cruciate ligament injury screening and in prophylactic training programmes.
40 CFR 76.8 - Early election for Group 1, Phase II boilers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...
40 CFR 76.8 - Early election for Group 1, Phase II boilers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...
40 CFR 76.8 - Early election for Group 1, Phase II boilers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...
40 CFR 76.8 - Early election for Group 1, Phase II boilers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...
40 CFR 76.8 - Early election for Group 1, Phase II boilers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.8 Early election for Group 1... plan and: (i) If a Phase I Acid Rain permit governing the source at which the unit is located has been... chapter to include the early election plan; or (ii) If a Phase I Acid Rain permit governing the source at...
South Bay Salt Pond Tidal Wetland Restoration Phase II Planning
Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re
Roosevelt-Vanderbilt alternative transportation system implementation plan : phase 2
DOT National Transportation Integrated Search
2004-12-01
This is the second phase of a plan to identify components of a sustainable and effective alternative transportation system that will provide improved access to, and connections among, the Roosevelt-Vanderbilt National Historic Site units. The goal is...
Phase III Early Restoration Meeting - Galveston, TX | NOAA Gulf Spill
Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News planning for Phase III and future early restoration plans. Open House: 6:00pm Public Meeting: 6:30pm
Phase III Early Restoration Meeting - Port Arthur, TX | NOAA Gulf Spill
Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News planning for Phase III and future early restoration plans. Open House: 6:00pm Public Meeting: 6:30pm
Phase III Early Restoration Meeting - Panama City, FL | NOAA Gulf Spill
Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News planning for Phase III and future early restoration plans. Open House: 6:00pm Public Meeting: 6:30pm
Studies of planning behavior of aircraft pilots in normal, abnormal, and emergency situations
NASA Technical Reports Server (NTRS)
Johannsen, G.; Rouse, W. B.; Hillmann, K.
1981-01-01
A methodology for the study of human planning behavior in complex dynamic systems is presented and applied to the study of aircraft pilot behavior in normal, abnormal and emergency situations. The method measures the depth of planning, that is the level of detail employed with respect to a specific task, according to responses to a verbal questionnaire, and compares planning depth with variables relating to time, task criticality and the probability of increased task difficulty. In two series of experiments, depth of planning was measured on a five- or ten-point scale during various phases of flight in a HFB-320 simulator under normal flight conditions, abnormal scenarios involving temporary runway closure due to snow removal or temporary CAT-III conditions due to a dense fog, and emergency scenarios involving engine shut-down or hydraulic pressure loss. Results reveal a dichotomy between event-driven and time-driven planning, different effects of automation in abnormal and emergency scenarios and a low correlation between depth of planning and workload or flight performance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spalding, B.P.; Naney, M.T.
1995-06-01
This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less
Definition of optical systems payloads
NASA Technical Reports Server (NTRS)
Downey, J. A., III
1981-01-01
The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.
Johnson, William
2005-01-01
Information technology planning can be described as a continuous cyclical process composed of three phases whose primary purpose is optimum allocation of scarce resources. In the assessment phase, planners assess user needs, environmental factors, business objectives, and IT infrastructure needs to develop IT projects that address needs in each of these areas. A major goal of this phase is to develop a broad IT inventory. The prioritization phase seeks to ensure optimum allocation of scarce resources by prioritizing ITprojects based on: Costs--total life cycle costs. Benefits--both quantitative and non-quantitative, including support for the organization's strategic business objectives. Risks--subjective assessments of technological and non-technological risks. Implementation requirements--time and personnel requirements to implement the system. The scheduling phase incorporates sequencing considerations, personnel availability, and budgetary constraints to produce an IT plan in which project priorities are adjusted to meet organizational realities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kang, S; Kim, D; Kim, T
2015-06-15
Purpose: End-of-exhale (EOE) phase is generally preferred for gating window because tumor position is more reproducible. However, other gating windows might be more appropriate for dose distribution perspective. In this pilot study, we proposed to utilize overlap volume histogram (OVH) to search optimized gating window and demonstrated its feasibility. Methods: We acquired 4DCT of 10 phases for 3 lung patients (2 with a target at right middle lobe and 1 at right upper lobe). After structures were defined in every phase, the OVH of each OAR was generated to quantify the three dimensional spatial relationship between the PTV and OARsmore » (bronchus, esophagus, heart and cord etc.) at each phase. OVH tells the overlap volume of an OAR according to outward distance from the PTV. Relative overlap volume at 20 mm outward distance from the PTV (ROV-20) was also defined as a metric for measuring overlap volume and obtained. For dose calculation, 3D CRT plans were made for all phases under the same beam angles and objectives (e.g., 95% of the PTV coverage with at least 100% of the prescription dose of 50 Gy). The gating window phase was ranked according to ROV-20, and the relationship between the OVH and dose distribution at each phase was evaluated by comparing the maximum dose, mean dose, and equivalent uniform dose of OAR. Results: OVHs showed noticeable difference from phase to phase, implying it is possible to find optimal phases for gating window. For 2 out of 3 patients (both with a target at RML), maximum dose, mean dose, and EUD increased as ROV-20 increased. Conclusion: It is demonstrated that optimal phases (in dose distribution perspective) for gating window could exist and OVH can be a useful tool for determining such phases without performing dose optimization calculations in all phases. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2012-007883) through the National Research Foundation (NRF) funded by the Ministry of Science, ICT & Future Planning (MSIP) of Korea.« less
Structural assembly demonstration experiment, phase 1
NASA Astrophysics Data System (ADS)
Akin, David L.; Bowden, Mary L.; Miller, Rene H.
1983-03-01
The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).
The impact of introducing intensity modulated radiotherapy into routine clinical practice.
Miles, Elizabeth A; Clark, Catharine H; Urbano, M Teresa Guerrero; Bidmead, Margaret; Dearnaley, David P; Harrington, Kevin J; A'Hern, Roger; Nutting, Christopher M
2005-12-01
Intensity modulated radiotherapy (IMRT) at the Royal Marsden Hospital London was introduced in July 2001. Treatment delivery was dynamic using a single-phase technique. Concerns were raised regarding increased clinical workload due to introduction of new technology. The potential increased use of resources was assessed. IMRT patient selection was within guidelines of clinical trials and included patients undergoing prostate plus pelvic lymph node (PPN) irradiation and head and neck cancer (HNC) treatment. Patient planning, quality assurance and treatment times were collected for an initial IMRT patient group. A comparative group of patients with advanced HNC undergoing two- or three-phase conventional radiotherapy, requiring matched photon and electron fields, were also timed. The median overall total planning time for IMRT was greater for HNC patients compared to the PPN cohort. For HNC the overall IMRT planning time was significantly longer than for conventional. The median treatment time for conventional two- or three-phase HNC treatments, encompassing similar volumes to those treated with IMRT, was greater than that for the IMRT HNC patient cohort. A reduction in radiographer man hours per patient of 4.8h was recorded whereas physics time was increased by 4.9h per patient. IMRT currently increases overall planning time. Additional clinician input is required for target volume localisation. Physics time is increased, a significant component of this being patient specific QA. Radiographer time is decreased. For HNC a single phase IMRT treatment has proven to be more efficient than a multiple phase conventional treatment. IMRT has been integrated smoothly and efficiently into the existing treatment working day. This preliminary study suggests that IMRT could be a routine treatment with efficient use of current radiotherapy resources.
Chen, Ching-Ho; Wu, Ray-Shyan; Liu, Wei-Lin; Su, Wen-Ray; Chang, Yu-Min
2009-01-01
Some countries, including Taiwan, have adopted strategic environmental assessment (SEA) to assess and modify proposed policies, plans, and programs (PPPs) in the planning phase for pursuing sustainable development. However, there were only some sketchy steps focusing on policy assessment in the system of Taiwan. This study aims to develop a methodology for SEA in Taiwan to enhance the effectiveness associated with PPPs. The proposed methodology comprises an SEA procedure involving PPP management and assessment in various phases, a sustainable assessment framework, and an SEA management system. The SEA procedure is devised based on the theoretical considerations by systems thinking and the regulative requirements in Taiwan. The positive and negative impacts on ecology, society, and economy are simultaneously considered in the planning (including policy generation and evaluation), implementation, and control phases of the procedure. This study used the analytic hierarchy process, Delphi technique, and systems analysis to develop a sustainable assessment framework. An SEA management system was built based on geographic information system software to process spatial, attribute, and satellite image data during the assessment procedure. The proposed methodology was applied in the SEA of golf course installation policy in 2001 as a case study, which was the first SEA in Taiwan. Most of the 82 existing golf courses in 2001 were installed on slope lands and caused a serious ecological impact. Assessment results indicated that 15 future golf courses installed on marginal lands (including buffer zones, remedied lands, and wastelands) were acceptable because the comprehensive environmental (ecological, social, and economic) assessment value was better based on environmental characteristics and management regulations of Taiwan. The SEA procedure in the planning phase for this policy was completed but the implementation phase of this policy was not begun because the related legislation procedure could not be arranged due to a few senators' resistance. A self-review of the control phase was carried out in 2006 using this methodology. Installation permits for 12 courses on slope lands were terminated after 2001 and then 27 future courses could be installed on marginal lands. The assessment value of this policy using the data on ecological, social, and economic conditions from 2006 was higher than that using the data from 2001. The analytical results illustrate that the proposed methodology can be used to effectively and efficiently assist the related authorities for SEA.
Lehman, Wayne E K; Simpson, D Dwayne; Knight, Danica K; Flynn, Patrick M
2011-06-01
Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A two-phase procedural approach is therefore presented based on the integration of Texas Christian University (TCU) models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. (PsycINFO Database Record (c) 2011 APA, all rights reserved).
NASA Astrophysics Data System (ADS)
Labak, P.; Rowlands, A.; Malich, G.; Charlton, A.; Schultz-Fellenz, E. S.; Craven, J.
2016-12-01
The availability of data and the ability to effectively interpret those data in the context of an alleged Treaty violation are critical to operations during the launch phase of an inspection. The launch phase encompasses the time when the initial inspection plan is being developed and finalised; this document will set the scene for the inspection and will propose mission activities for the critical first three days of an inspection. While authenticated data products from the CTBT International Data Centre form the basis of the initial inspection plan, other data types, provided as national technical means, can also be used to inform the development of the initial inspection plan. In this context, remotely sensed data and derived products acquired from sensors on satellites feature prominently. Given the environmental setting, optical and/or radar sensors have the potential to provide valuable information to guide mission activities. Such data could provide more than mere backdrops to mapping products. While recognising time constraints and the difficulties associated with integrating data from disparate optical and radar sensors, this abstract uses case studies to illustrate the types of derived data products from sapecborne sensors that have the potential to inform inspectors during the preparation of the initial inspection plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, B.D.
The objective of this project is to advance lower cost solar cooling technology with the feasibility analysis, design and evaluation of proof-of-concept open cycle solar cooling concepts. The work is divided into three phases, with planned completion of each phase before proceeding with the following phase: Phase I - performance/economic/environmental related analysis and exploratory studies; Phase II - design and construction of an experimental system, including evaluative testing; Phase III - extended system testing during operation and engineering modifications as required. For Phase I, analysis and resolution of critical issues were completed with the objective of developing design specifications formore » an improved prototype OCA system.« less
ERIC Educational Resources Information Center
ENDWRIGHT, D.K.
THE PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION PROGRAMS IN CORRECTIVE INSTITUTIONS IS ORGANIZED INTO FIVE TIMED PHASES TO BE COMPLETED IN THREE YEARS. A CHART REPRESENTING THE PROGRAM, AFFILIATED RESEARCH AND AGENCIES DELINEATES PLANNED ACTIVITIES. PHASE ONE (15 WEEKS) WILL SURVEY EXISTING PROGRAMS (VOCATIONAL AND ACADEMIC FACILITIES,…
A novel four-dimensional radiotherapy planning strategy from a tumor-tracking beam's eye view
NASA Astrophysics Data System (ADS)
Li, Guang; Cohen, Patrice; Xie, Huchen; Low, Daniel; Li, Diana; Rimner, Andreas
2012-11-01
To investigate the feasibility of four-dimensional radiotherapy (4DRT) planning from a tumor-tracking beam's eye view (ttBEV) with reliable gross tumor volume (GTV) delineation, realistic normal tissue representation, high planning accuracy and low clinical workload, we propose and validate a novel 4D conformal planning strategy based on a synthesized 3.5D computed tomographic (3.5DCT) image with a motion-compensated tumor. To recreate patient anatomy from a ttBEV in the moving tumor coordinate system for 4DRT planning (or 4D planning), the centers of delineated GTVs in all phase CT images of 4DCT were aligned, and then the aligned CTs were averaged to produce a new 3.5DCT image. This GTV-motion-compensated CT contains a motionless target (with motion artifacts minimized) and motion-blurred normal tissues (with a realistic temporal density average). Semi-automatic threshold-based segmentation of the tumor, lung and body was applied, while manual delineation was used for other organs at risk (OARs). To validate this 3.5DCT-based 4D planning strategy, five patients with peripheral lung lesions of small size (<5 cm3) and large motion range (1.2-3.5 cm) were retrospectively studied for stereotactic body radiotherapy (SBRT) using 3D conformal radiotherapy planning tools. The 3.5DCT-based 4D plan (3.5DCT plan) with 9-10 conformal beams was compared with the 4DCT-based 4D plan (4DCT plan). The 4DCT plan was derived from multiple 3D plans based on all phase CT images, each of which used the same conformal beam configuration but with an isocenter shift to aim at the moving tumor and a minor beam aperture and weighting adjustment to maintain plan conformality. The dose-volume histogram (DVH) of the 4DCT plan was created with two methods: one is an integrated DVH (iDVH4D), which is defined as the temporal average of all 3D-phase-plan DVHs, and the other (DVH4D) is based on the dose distribution in a reference phase CT image by dose warping from all phase plans using the displacement vector field (DVF) from a free-form deformable image registration (DIR). The DVH3.5D (for the 3.5DCT plan) was compared with both iDVH4D and DVH4D. To quantify the DVH difference between the 3.5DCT plan and the 4DCT plan, two methods were used: relative difference (%) of the areas underneath the DVH curves and the volumes receiving more than 20% (V20) and 50% (V50) of prescribed dose of these 4D plans. The volume of the delineated GTV from different phase CTs varied dramatically from 24% to 112% among the five patients, whereas the GTV from 3.5DCT deviated from the averaged GTV in 4DCT by only -6%±6%. For planning tumor volume (PTV) coverage, the difference between the DVH3.5D and iDVH4D was negligible (<1% area), whereas the DVH3.5D and DVH4D were quite different, due to DIR uncertainty (˜2 mm), which propagates to PTV dose coverage with a pronounced uncertainty for small tumors (0.3-4.0 cm3) in stereotactic plans with sharp dose falloff around PTV. For OARs, such as the lung, heart, cord and esophagus, the three DVH curves (DVH3.5D, DVH4D and iDVH4D) were found to be almost identical for the same patients, especially in high-dose regions. For the tumor-containing lung, the relative difference of the areas underneath the DVH curves was found to be small (5.3% area on average), of which 65% resulted from the low-dose region (D < 20%). The averaged V20 difference between the two 4D plans was 1.2% ± 0.8%. For the mean lung dose (MLD), the 3.5DCT plan differed from the 4DCT plan by -1.1%±1.3%. GTV-motion-compensated CT (3.5DCT) produces an accurate and reliable GTV delineation, which is close to the mean GTV from 4DCT. The 3.5DCT plan is equivalent to the 4DCT plan with <1% dose difference to the PTV and negligible dose difference in OARs. The 3.5DCT approach simplifies 4D planning and provides accurate dose calculation without a substantial increase of clinical workload for motion-tracking delivery to treat small peripheral lung tumors with large motion.
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
1982-01-01
Cass Water Management District, and North Dakota State Water Commission, have testified to the severity of flooding along the lower Sheyenne River and...have requested study and implementation of alternatives to resolve these problems. Several interests testifying in opposition to the authorized Kindred...alternative was borderline . The plan is not considered implementable. 3.07 Plan K-2 - Plan K-2 consists of a reduced-size Kindred Dam, a 5- to 15
Development of a probabilistic PCB-bioaccumulation model for six fish species in the Hudson River
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stackelberg, K. von; Menzie, C.
1995-12-31
In 1984 the US Environmental Protection Agency (USEPA) completed a Feasibility Study on the Hudson River that investigated remedial alternatives and issued a Record of Decision (ROD) later that year. In December 1989 USEPA decided to reassess the No Action decision for Hudson River sediments. This reassessment consists of three phases: Interim Characterization and Evaluation (Phase 1); Further Site Characterization and Analysis (Phase 2); and, Feasibility study (Phase 3). A Phase 1 report was completed in August, 1991. The team then completed a Final Work Plan for Phase 2 in September 1992. This work plan identified various PCB fate andmore » transport modeling activities to support the Hudson River PCB Reassessment Remedial Investigation and Feasibility Study (RI/FS). This talk provides a description of the development of a Probabilistic bioaccumulation models to describe the uptake of PCBs on a congener-specific basis in six fish species. The authors have developed a framework for relating body burdens of PCBs in fish to exposure concentrations in Hudson River water and sediments. This framework is used to understand historical and current relationships as well as to predict fish body burdens for future conditions under specific remediation and no action scenarios. The framework incorporates a probabilistic approach to predict distributions in PCB body burdens for selected fish species. These models can predict single population statistics such as the average expected values of PCBs under specific scenarios as well as the distribution of expected concentrations.« less
NASA Technical Reports Server (NTRS)
1985-01-01
Technology payoffs of representative ground based (Phase 1) and space based (Phase 2) mid lift/drag ratio (L/D) aeroassisted orbit transfer vehicles (AOTV) were assessed and prioritized. The methodology employed to generate technology payoffs, the major payoffs identified, the urgency of the technology effort required, and the technology plans suggested are summarized for both study phases. Technology issues concerning aerodynamics, aerothermodynamics, thermal protection, propulsion, and guidance, navigation and control are addressed.
Automating Space Station operations planning
NASA Technical Reports Server (NTRS)
Ziemer, Kathleen A.
1989-01-01
The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.
Tug fleet and ground operations schedules and controls. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1975-01-01
This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.
NASA Astrophysics Data System (ADS)
Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.
2008-07-01
In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.
Miyazaki, Masayoshi; Nishiyama, Kinji; Ueda, Yoshihiro; Ohira, Shingo; Tsujii, Katsutomo; Isono, Masaru; Masaoka, Akira; Teshima, Teruki
2016-07-01
The aim of this study was to compare three strategies for intensity-modulated radiotherapy (IMRT) for 20 head-and-neck cancer patients. For simultaneous integrated boost (SIB), doses were 66 and 54 Gy in 30 fractions for PTVboost and PTVelective, respectively. Two-phase IMRT delivered 50 Gy in 25 fractions to PTVelective in the First Plan, and 20 Gy in 10 fractions to PTVboost in the Second Plan. Sequential SIB (SEQ-SIB) delivered 55 Gy and 50 Gy in 25 fractions, respectively, to PTVboost and PTVelective using SIB in the First Plan and 11 Gy in 5 fractions to PTVboost in the Second Plan. Conformity indexes (CIs) (mean ± SD) for PTVboost and PTVelective were 1.09 ± 0.05 and 1.34 ± 0.12 for SIB, 1.39 ± 0.14 and 1.80 ± 0.28 for two-phase IMRT, and 1.14 ± 0.07 and 1.60 ± 0.18 for SEQ-SIB, respectively. CI was significantly highest for two-phase IMRT. Maximum doses (Dmax) to the spinal cord were 42.1 ± 1.5 Gy for SIB, 43.9 ± 1.0 Gy for two-phase IMRT and 40.3 ± 1.8 Gy for SEQ-SIB. Brainstem Dmax were 50.1 ± 2.2 Gy for SIB, 50.5 ± 4.6 Gy for two-phase IMRT and 47.4 ± 3.6 Gy for SEQ-SIB. Spinal cord Dmax for the three techniques was significantly different, and brainstem Dmax was significantly lower for SEQ-SIB. The compromised conformity of two-phase IMRT can result in higher doses to organs at risk (OARs). Lower OAR doses in SEQ-SIB made SEQ-SIB an alternative to SIB, which applies unconventional doses per fraction. © The Author 2016. Published by Oxford University Press on behalf of The Japan Radiation Research Society and Japanese Society for Radiation Oncology.
Information Management For Tactical Reconnaissance
NASA Astrophysics Data System (ADS)
White, James P.
1984-12-01
The expected battlefield tactics of the 1980's and 1990's will be fluid and dynamic. If tactical reconnaissance is to meet this challenge, it must explore all ways of accelerating the flow of information through the reconnaissance cycle, from the moment a tasking request is received to the time the mission results are delivered to the requestor. In addition to near real-time dissemination of reconnaissance information, the mission planning phase needs to be more responsive to the rapidly changing battlefield scenario. By introducing Artificial Intelligence (AI) via an expert system to the mission planning phase, repetitive and computational tasks can be more readily performed by the ground-based mission planning system, thereby permitting the aircrew to devote more of their time to target study. Transporting the flight plan, plus other mission data, to the aircraft is simple with the Fairchild Data Transfer Equipment (DTE). Aircrews are relieved of the tedious, error-prone, and time-consuming task of manually keying-in avionics initialization data. Post-flight retrieval of mission data via the DTE will permit follow-on aircrews, just starting their mission planning phase, to capitalize on current threat data collected by the returning aircrew. Maintenance data retrieved from the recently flown mission will speed-up the aircraft turn-around by providing near-real time fault detection/isolation. As future avionics systems demand more information, a need for a computer-controlled, smart data base or expert system on-board the aircraft will emerge.
A short guide to giving bad news.
Mitchell, Jeffrey T
2008-01-01
Approaching an individual or a family with bad news, but without an appropriate plan to present the information in a structured manner, is almost a guarantee of greater emotional pain and disruption for the recipients of the news. Crisis interveners must develop a strategic plan for the announcement of bad news. That plan should entail a lead-up phase, a transmission phase, and a followup phase. The lead-up phase encompasses the gathering of accurate, verifiable information and the clear identification of the targets of the information. The transmission phase includes immediate preparation for the presentation of the information, the actual announcement, and the presentation of additional details as questions arise. The follow-up phase includes a range of supportive interventions to assist people in the immediate crisis reaction. It also includes a system of referrals for people who might benefit from additional professional care. This article provides practical guidelines for providing bad news to the loved ones of injured, ill, or deceased people.
NASA Astrophysics Data System (ADS)
1992-10-01
The overall objective of the DARPA/Tri-Service RASSP program is to demonstrate a capability to rapidly specify, produce, and yield domain-specific, affordable signal processors for use in Department of Defense systems such as automatic target acquisition, tracking, and recognition, electronic countermeasures, communications, and SIGINT. The objective of the study phase is to specify a recommended program plan for the government to use as a template for procurement of the RASSP design system and demonstration program. To accomplish that objective, the study phase program tasks are to specify a development methodology for signal processors (adaptable to various organizational design styles, and application areas), analyze the requirements in CAD/CAE tools to support the development methodology, identify the state and development plans of the industry relative to this area, and to recommend the additional developments not currently being addressed by the industry, which are recommended as RASSP developments. In addition, the RASSP study phase will define a linking approach for electronically linking design centers to manufacturing centers so a complete cycle for prototyping can be accomplished with significantly reduced cycle time.
Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition
NASA Astrophysics Data System (ADS)
Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly
2018-04-01
Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.
An adaptive reentry guidance method considering the influence of blackout zone
NASA Astrophysics Data System (ADS)
Wu, Yu; Yao, Jianyao; Qu, Xiangju
2018-01-01
Reentry guidance has been researched as a popular topic because it is critical for a successful flight. In view that the existing guidance methods do not take into account the accumulated navigation error of Inertial Navigation System (INS) in the blackout zone, in this paper, an adaptive reentry guidance method is proposed to obtain the optimal reentry trajectory quickly with the target of minimum aerodynamic heating rate. The terminal error in position and attitude can be also reduced with the proposed method. In this method, the whole reentry guidance task is divided into two phases, i.e., the trajectory updating phase and the trajectory planning phase. In the first phase, the idea of model predictive control (MPC) is used, and the receding optimization procedure ensures the optimal trajectory in the next few seconds. In the trajectory planning phase, after the vehicle has flown out of the blackout zone, the optimal reentry trajectory is obtained by online planning to adapt to the navigation information. An effective swarm intelligence algorithm, i.e. pigeon inspired optimization (PIO) algorithm, is applied to obtain the optimal reentry trajectory in both of the two phases. Compared to the trajectory updating method, the proposed method can reduce the terminal error by about 30% considering both the position and attitude, especially, the terminal error of height has almost been eliminated. Besides, the PIO algorithm performs better than the particle swarm optimization (PSO) algorithm both in the trajectory updating phase and the trajectory planning phases.
Fulton, Lawrence; Kerr, Bernie; Inglis, James M; Brooks, Matthew; Bastian, Nathaniel D
2015-07-01
In this study, we re-evaluate air ambulance requirements (rules of allocation) and planning considerations based on an Army-approved, Theater Army Analysis scenario. A previous study using workload only estimated a requirement of 0.4 to 0.6 aircraft per admission, a significant bolus over existence-based rules. In this updated study, we estimate requirements for Phase III (major combat operations) using a simulation grounded in previously published work and Phase IV (stability operations) based on four rules of allocation: unit existence rules, workload factors, theater structure (geography), and manual input. This study improves upon previous work by including the new air ambulance mission requirements of Department of Defense 51001.1, Roles and Functions of the Services, by expanding the analysis over two phases, and by considering unit rotation requirements known as Army Force Generation based on Department of Defense policy. The recommendations of this study are intended to inform future planning factors and already provided decision support to the Army Aviation Branch in determining force structure requirements. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.
Improving energy audit process and report outcomes through planning initiatives
NASA Astrophysics Data System (ADS)
Sprau Coulter, Tabitha L.
Energy audits and energy models are an important aspect of the retrofit design process, as they provide project teams with an opportunity to evaluate a facilities current building systems' and energy performance. The information collected during an energy audit is typically used to develop an energy model and an energy audit report that are both used to assist in making decisions about the design and implementation of energy conservation measures in a facility. The current lack of energy auditing standards results in a high degree of variability in energy audit outcomes depending on the individual performing the audit. The research presented is based on the conviction that performing an energy audit and producing a value adding energy model for retrofit buildings can benefit from a revised approach. The research was divided into four phases, with the initial three phases consisting of: 1.) process mapping activity - aimed at reducing variability in the energy auditing and energy modeling process. 2.) survey analysis -- To examine the misalignment between how industry members use the top energy modeling tools compared to their intended use as defined by software representatives. 3.) sensitivity analysis -- analysis of the affect key energy modeling inputs are having on energy modeling analysis results. The initial three phases helped define the need for an improved energy audit approach that better aligns data collection with facility owners' needs and priorities. The initial three phases also assisted in the development of a multi-criteria decision support tool that incorporates a House of Quality approach to guide a pre-audit planning activity. For the fourth and final research phase explored the impacts and evaluation methods of a pre-audit planning activity using two comparative energy audits as case studies. In each case, an energy audit professionals was asked to complete an audit using their traditional methods along with an audit which involved them first participating in a pre-audit planning activity that aligned the owner's priorities with the data collection. A comparative analysis was then used to evaluate the effects of the pre-audit planning activity in developing a more strategic method for collecting data and representing findings in an energy audit report to a facility owner. The case studies demonstrated that pre-audit planning has the potential to improve the efficiency of an energy audit process through reductions in transition time waste. The cases also demonstrated the value of audit report designs that are perceived by owners to be project specific vs. generic. The research demonstrated the ability to influence and alter an auditors' behavior through participating in a pre-audit planning activity. It also shows the potential benefits of using the House of Quality as a method of aligning data collection with owner's goals and priorities to develop reports that have increased value.
DOT National Transportation Integrated Search
2016-03-14
The Performance Measurement and Evaluation Support Plan for the Connected Vehicle Pilot Deployment Program Phase 1, Tampa Hillsborough Expressway Authority, outlines the goals and objectives for the Pilot as well as the proposed performance metrics. ...
78 FR 77098 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-20
...: Regular submission (extension of a current information collection). Number of Respondents: 1,800. Average... Trustees in more efficiently carrying out the restoration planning phase of Natural Resource Damage... requiring restoration, during the restoration planning phase of the NRDA process. Affected Public: Not-for...
Massett, Holly A.; Mishkin, Grace; Rubinstein, Larry; Ivy, S. Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A.; Abrams, Jeffrey S.
2016-01-01
Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAPs) received for slow-accruing Phase 1 and 2 trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for Phase 1 trials and 66 for Phase 2 trials. Primary reasons cited for slow accrual were safety/toxicity (Phase 1: 48%), design/protocol concerns (Phase 1: 42%, Phase 2: 33%), and eligibility criteria (Phase 1: 41%, Phase 2: 35%). The most commonly proposed corrective actions were adding institutions (Phase 1: 43%, Phase 2: 85%) and amending the trial to change eligibility or design (Phase 1: 55%, Phase 2: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (Phase 1=48; Phase 2=46). Of these, 67% of Phase 1 and 70% of Phase 2 trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial lifecycles, but it may be more beneficial to invest in earlier accrual planning. PMID:27401246
Dimethyl Disulfide (DMDS) Fumigant Management Plan Template Phase 2
These templates provide a framework for developing your FMP, including sections on your supervising pesticide applicator, buffer zones, emergency response plan, handler information, tarp plan, soil conditions, signage, and air monitoring plan.
SU-F-J-169: A Feasibility Study of Using MRI Alone in Abdominal Radiotherapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zawisza, I; Hsu, S; Peng, Q
Purpose: To demonstrate the feasibility of a MRI alone workflow to support treatment planning and image guidance for abdominal radiotherapy. Methods: Abdominal MR images (in-phase/out-phase/fat/water) were acquired for a patient with breath-hold using a Dixon pulse sequence. Air masks were created on in-phase images using intensity thresholding and morphological processing methods in order to separate air from bone. Pseudo-CT and DRRs were generated using a published method. To investigate the effect of heterogeneity corrections on dose calculations using pseudo-CT, three different plans (3-field 3D, 5-field IMRT and 2-arc VMAT) were performed to mimic pancreatic treatments (1.8Gy/fraction over 28 fractions). Results:more » The DRRs created from pseudo-CT were of comparable quality as those created from CT. Comparing dose calculations with and without heterogeneity corrections between the 3 different plans, the biggest dosimetric differences were seen in the VMAT plan where modulation must occur across air-tissue interfaces such as those of the stomach and bowel. The DVHs for the VMAT plan showed ∼84cc difference at V50Gy in the small bowel. In terms of pseudo-CT quality, some small volumes of air in the bowel and stomach were misclassified as bone. The VMAT plan was re-optimized on pseudo-CT with 0 HU in the misclassified areas. The V50Gy in the small bowel differed by ∼90cc between the new VMAT plan with and without heterogeneity corrections. Conclusion: We found that the use of MRI alone is feasible for abdominal treatment planning and image guidance. A difference between calculations with and without heterogeneity corrections was found that is most pronounced for VMAT where the traversal of air-tissue interfaces is unavoidable. Future work will be performed to minimize misclassification between bone and air.« less
ERIC Educational Resources Information Center
Sadaf, Ayesha; Newby, Timothy J.; Ertmer, Peggy A.
2016-01-01
The purpose of the study was to investigate factors that predict preservice teachers' intentions and actual uses of Web 2.0 tools in their classrooms. A two-phase, mixed method, sequential explanatory design was used. The first phase explored factors, based on the decomposed theory of planned behavior, that predict preservice teachers' intentions…
James Webb Space Telescope Orbit Determination Analysis
NASA Technical Reports Server (NTRS)
Yoon, Sungpil; Rosales, Jose; Richon, Karen
2014-01-01
The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-Earth/Moon L2 libration point, 1.5 million km away from Earth. This paper describes the results of an orbit determination (OD) analysis of the JWST mission emphasizing the challenges specific to this mission in various mission phases. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate OD solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cm/sec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.
Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis
NASA Technical Reports Server (NTRS)
Chung, Lauren R.; Novak, Stefan; Long, Anne; Gramling, Cheryl
2009-01-01
The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yang Xiaocheng; Han-Oh, Sarah; Gui Minzhi
2012-09-15
Purpose: Dose-rate-regulated tracking (DRRT) is a tumor tracking strategy that programs the MLC to track the tumor under regular breathing and adapts to breathing irregularities during delivery using dose rate regulation. Constant-dose-rate tracking (CDRT) is a strategy that dynamically repositions the beam to account for intrafractional 3D target motion according to real-time information of target location obtained from an independent position monitoring system. The purpose of this study is to illustrate the differences in the effectiveness and delivery accuracy between these two tracking methods in the presence of breathing irregularities. Methods: Step-and-shoot IMRT plans optimized at a reference phase weremore » extended to remaining phases to generate 10-phased 4D-IMRT plans using segment aperture morphing (SAM) algorithm, where both tumor displacement and deformation were considered. A SAM-based 4D plan has been demonstrated to provide better plan quality than plans not considering target deformation. However, delivering such a plan requires preprogramming of the MLC aperture sequence. Deliveries of the 4D plans using DRRT and CDRT tracking approaches were simulated assuming the breathing period is either shorter or longer than the planning day, for 4 IMRT cases: two lung and two pancreatic cases with maximum GTV centroid motion greater than 1 cm were selected. In DRRT, dose rate was regulated to speed up or slow down delivery as needed such that each planned segment is delivered at the planned breathing phase. In CDRT, MLC is separately controlled to follow the tumor motion, but dose rate was kept constant. In addition to breathing period change, effect of breathing amplitude variation on target and critical tissue dose distribution is also evaluated. Results: Delivery of preprogrammed 4D plans by the CDRT method resulted in an average of 5% increase in target dose and noticeable increase in organs at risk (OAR) dose when patient breathing is either 10% faster or slower than the planning day. In contrast, DRRT method showed less than 1% reduction in target dose and no noticeable change in OAR dose under the same breathing period irregularities. When {+-}20% variation of target motion amplitude was present as breathing irregularity, the two delivery methods show compatible plan quality if the dose distribution of CDRT delivery is renormalized. Conclusions: Delivery of 4D-IMRT treatment plans, stemmed from 3D step-and-shoot IMRT and preprogrammed using SAM algorithm, is simulated for two dynamic MLC-based real-time tumor tracking strategies: with and without dose-rate regulation. Comparison of cumulative dose distribution indicates that the preprogrammed 4D plan is more accurately and efficiently conformed using the DRRT strategy, as it compensates the interplay between patient breathing irregularity and tracking delivery without compromising the segment-weight modulation.« less
Assessing validity of observational intervention studies – the Benchmarking Controlled Trials
Malmivaara, Antti
2016-01-01
Abstract Background: Benchmarking Controlled Trial (BCT) is a concept which covers all observational studies aiming to assess impact of interventions or health care system features to patients and populations. Aims: To create and pilot test a checklist for appraising methodological validity of a BCT. Methods: The checklist was created by extracting the most essential elements from the comprehensive set of criteria in the previous paper on BCTs. Also checklists and scientific papers on observational studies and respective systematic reviews were utilized. Ten BCTs published in the Lancet and in the New England Journal of Medicine were used to assess feasibility of the created checklist. Results: The appraised studies seem to have several methodological limitations, some of which could be avoided in planning, conducting and reporting phases of the studies. Conclusions: The checklist can be used for planning, conducting, reporting, reviewing, and critical reading of observational intervention studies. However, the piloted checklist should be validated in further studies.Key messagesBenchmarking Controlled Trial (BCT) is a concept which covers all observational studies aiming to assess impact of interventions or health care system features to patients and populations.This paper presents a checklist for appraising methodological validity of BCTs and pilot-tests the checklist with ten BCTs published in leading medical journals. The appraised studies seem to have several methodological limitations, some of which could be avoided in planning, conducting and reporting phases of the studies.The checklist can be used for planning, conducting, reporting, reviewing, and critical reading of observational intervention studies. PMID:27238631
Teaching the Public Relations Campaigns Course.
ERIC Educational Resources Information Center
Worley, Debra A.
2001-01-01
Argues for a Campaign Planning Course in the undergraduate public relations major. Discusses nine course objectives. Describes five phases of campaign planning and implementation, how the phase approach includes important course topics, and how it fulfills course objectives. Describes how student groups work with actual clients throughout the…
Brown, William M
2006-04-01
TolerRx Inc, under license from BTG plc, is developing TRX-4, an anti-CD3 humanized monoclonal antibody for the potential treatment of type 1 diabetes and psoriasis. Phase II trials of the therapeutic antibody in type 1 diabetes have been completed and the company is planning a pivotal phase III trial for this indication. TolerRx is also enrolling psoriasis patients in a phase Ib clinical study of TRX-4. TRX-4 has been awarded Orphan Drug status for recent-onset type 1 diabetes.
25 CFR 1000.20 - What is required in a planning report?
Code of Federal Regulations, 2011 CFR
2011-04-01
... planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a... Tribe's/Consortium's planning efforts have revealed that its current organization is adequate to assume...
ERIC Educational Resources Information Center
Chareonchai, Ruang; And Others
This extensive assessment project report focuses on the Rural Secondary Schools (RSS) Project in Thailand. The background, design, rationale and objectives of the assessment are described, as are the eight phases of the study: reconnaissance; proposals; basic planning and pre-testing; data collection; analysis; academic review; final report; and…
ERIC Educational Resources Information Center
California Univ., Los Angeles. Inst. of Library Research.
The general conclusions of the planning study on Mechanized Information Services in the University Library are that such services represent a desirable, even necessary, extension of the library's traditional functions. Preliminary specifications for such a library-based "Center for Information Services" (CIS) are presented in this report. Covered…
NASA Astrophysics Data System (ADS)
Winkel, D.; Bol, G. H.; van Asselen, B.; Hes, J.; Scholten, V.; Kerkmeijer, L. G. W.; Raaymakers, B. W.
2016-12-01
To develop an automated radiotherapy treatment planning and optimization workflow to efficiently create patient specifically optimized clinical grade treatment plans for prostate cancer and to implement it in clinical practice. A two-phased planning and optimization workflow was developed to automatically generate 77Gy 5-field simultaneously integrated boost intensity modulated radiation therapy (SIB-IMRT) plans for prostate cancer treatment. A retrospective planning study (n = 100) was performed in which automatically and manually generated treatment plans were compared. A clinical pilot (n = 21) was performed to investigate the usability of our method. Operator time for the planning process was reduced to <5 min. The retrospective planning study showed that 98 plans met all clinical constraints. Significant improvements were made in the volume receiving 72Gy (V72Gy) for the bladder and rectum and the mean dose of the bladder and the body. A reduced plan variance was observed. During the clinical pilot 20 automatically generated plans met all constraints and 17 plans were selected for treatment. The automated radiotherapy treatment planning and optimization workflow is capable of efficiently generating patient specifically optimized and improved clinical grade plans. It has now been adopted as the current standard workflow in our clinic to generate treatment plans for prostate cancer.
Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
2013-10-01
349–372 Phase Zero Contracting Operations (PZCO) FIGURE 4. CONTRACTING PHASE ZERO: PLAN, EXERCISE, REHEARSE, AND SYNCHRONIZE Note. BPA = Blanket...More Robust Construction Supplies; Oce Equipment; Quality of Life; and Morale, Welfare, and Recreation PO/TO/DO/ BPA Small Purchase Standard Vehicles PO...TO/DO/ BPA Small Purchase Standard Vehicles PO/TO/DO/ BPA Small Purchase Standard Vehicles PO/TO/DO/ BPA Small Purchase Food, Water, Billeting, Hygiene
NASA Astrophysics Data System (ADS)
Satoh, Kotaro
1992-02-01
This paper summarizes the first phase of the TRISTAN, the energy upgrade for aiming at the energy frontier. Then it describes the present accelerator performance in the second phase where the objective is the luminosity accumulation. The asymmetric B factory is being planned as the third phase of the TRISTAN. This paper also outlines its design and points out some critical issues. These are the longitudinal coupled bunch instability, the chromaticity correction, the insertion design, and injectors.
Arredondo, A; Parada, I
2001-01-01
This article presents the results from an evaluative longitudinal study with before-after design. The main objective was to determine the effects of health care decentralization on changes in health financing. Taking into account feasibility, political and technical criteria, three Latin American countries were selected as study populations: Mexico, Nicaragua and Peru. The methodology had two main phases. In the first phase, the study referred to secondary sources of data and documents to obtain information about the following variables: type of decentralization implemented, source of finance, funds of financing, providers, final use of resources and mechanisms for resource allocation. In the second phase, the study referred to primary data collected in a survey of key personnel from the health sectors of each country. Taking into account the changes implemented in the three countries, as well as the strengths and weaknesses of each country in financing and decentralization, a rule for decision-making is proposed that attempts to identify the main financial changes implemented in each country and the basic indicators that can be used in future years to direct the planning, assessment, adjustment and correction of health financing and decentralization.
Outdoor Education - A Guide to Site Planning and Implementation of Programs.
ERIC Educational Resources Information Center
Texas Education Agency, Austin. Div. of Curriculum Development.
This booklet presents guidelines for initiating outdoor instructional programs. Initially, the guide lists the objectives of outdoor education: survival, recreation, development of personal health and well-being, career opportunities, and social adjustment. A discussion follows on the three phases of site planning. The first phase is site analysis…
Process test plan, phase II: waste retrieval sluicing system emissions collection
DOE Office of Scientific and Technical Information (OSTI.GOV)
POWERS, R.L.
1999-06-01
This Process Test Plan is prepared to continue from HNF-3733 which was Phase I of the test. Supplemental operational controls and sampling requirements are defined to safely obtain gas samples from the 296-C-006 ventilation system stack during active operation of the sluicing equipment.
30 CFR 285.629 - May I develop my lease in phases?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false May I develop my lease in phases? 285.629 Section 285.629 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT... CONTINENTAL SHELF Plans and Information Requirements Contents of the Construction and Operations Plan § 285...
GEWEX Cloud System Study (GCSS) Working Group on Cirrus Cloud Systems (WG2)
NASA Technical Reports Server (NTRS)
Starr, David
2002-01-01
Status, progress and plans will be given for current GCSS (GEWEX Cloud System Study) WG2 (Working Group on Cirrus Cloud Systems) projects, including: (a) the Idealized Cirrus Model Comparison Project, (b) the Cirrus Parcel Model Comparison Project (Phase 2), and (c) the developing Hurricane Nora extended outflow model case study project. Past results will be summarized and plans for the upcoming year described. Issues and strategies will be discussed. Prospects for developing improved cloud parameterizations derived from results of GCSS WG2 projects will be assessed. Plans for NASA's CRYSTAL-FACE (Cirrus Regional Study of Tropical Anvils and Layers - Florida Area Cirrus Experiment) potential opportunities for use of those data for WG2 model simulations (future projects) will be briefly described.
NASA Technical Reports Server (NTRS)
Kelton, K. F.; Croat, T. K.; Gangopadhyay, A.; Holland-Moritz, D.; Hyers, Robert W.; Rathz, Thomas J.; Robinson, Michael B.; Rogers, Jan R.
2001-01-01
Undercooling experiments and thermal physical property measurements of metallic alloys on the International Space Station (ISS) are planned. This recently-funded research focuses on fundamental issues of the formation and structure of highly-ordered non-crystallographic phases (quasicrystals) and related crystal phases (crystal approximants), and the connections between the atomic structures of these phases and those of liquids and glasses. It extends studies made previously by us of the composition dependence of crystal nucleation processes in silicate and metallic glasses, to the case of nucleation from the liquid phase. Motivating results from rf-levitation and drop-tube measurements of the undercooling of Ti/Zr-based liquids that form quasicrystals and crystal approximants are discussed. Preliminary measurements by electrostatic levitation (ESL) are presented.
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1981-01-01
Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.
Test plan. Task 5, subtask 5.2: Early on-orbit TPSdebris impact tests
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
The limitation of damage to, and survival of, the cryogenic tankage during the on-orbit stay despite potential impact of orbital debris, may be a significant discriminator in the RHCTS trade studies described in the TA-1 trade study plan (ref. RHCTS-TSP-1) dated July 29, 1994. The objective of this early phase of an overall debris impact test program is to provide the data to support assessment of the relative suitability of integral and non integral tanks.
Massett, Holly A; Mishkin, Grace; Rubinstein, Larry; Ivy, S Percy; Denicoff, Andrea; Godwin, Elizabeth; DiPiazza, Kate; Bolognese, Jennifer; Zwiebel, James A; Abrams, Jeffrey S
2016-11-15
Accruing patients in a timely manner represents a significant challenge to early phase cancer clinical trials. The NCI Cancer Therapy Evaluation Program analyzed 19 months of corrective action plans (CAP) received for slow-accruing phase I and II trials to identify slow accrual reasons, evaluate whether proposed corrective actions matched these reasons, and assess the CAP impact on trial accrual, duration, and likelihood of meeting primary scientific objectives. Of the 135 CAPs analyzed, 69 were for phase I trials and 66 for phase II trials. Primary reasons cited for slow accrual were safety/toxicity (phase I: 48%), design/protocol concerns (phase I: 42%, phase II: 33%), and eligibility criteria (phase I: 41%, phase II: 35%). The most commonly proposed corrective actions were adding institutions (phase I: 43%, phase II: 85%) and amending the trial to change eligibility or design (phase I: 55%, phase II: 44%). Only 40% of CAPs provided proposed corrective actions that matched the reasons given for slow accrual. Seventy percent of trials were closed to accrual at time of analysis (phase I = 48; phase II = 46). Of these, 67% of phase I and 70% of phase II trials met their primary objectives, but they were active three times longer than projected. Among closed trials, 24% had an accrual rate increase associated with a greater likelihood of meeting their primary scientific objectives. Ultimately, trials receiving CAPs saw improved accrual rates. Future trials may benefit from implementing CAPs early in trial life cycles, but it may be more beneficial to invest in earlier accrual planning. Clin Cancer Res; 22(22); 5408-16. ©2016 AACRSee related commentary by Mileham and Kim, p. 5397. ©2016 American Association for Cancer Research.
SU-F-T-634: Feasibility Study of Respiratory Gated RapidArc SBRT Using a 6MV FFF Photon Beam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dou, K; Safaraz, M; Rodgers, J
Purpose: To conduct a feasibility study on retrospective respiratory gating and marker tracking for lung stereotactic body radiotherapy (SBRT) with a gated RapidArc delivery using a 6MV flattened filter free photon mode. Methods: A CIRS dynamic thorax phantom Model 008A with different inserts was used for treatment planning and respiratory gating. 4D CT had a free breathing simulation followed by a respiration gated, ten phased CT using a Philips Brilliance CT with a Varian RPM respiratory gating system. The internal target volume was created from the ten phase gated CT images, followed by exporting to a Varian Eclipse TPS v11more » for treatment planning on the free breath images. Both MIP and AIP were also generated for comparison of planning and target motion tracking. The planned dose was delivered with a 6MV FFF photon beam from a Varian TrueBeam accelerator. Gated target motion was also verified by tracking the implanted makers during delivery using continuous kV imaging in addition to CBCT, kV and MV localization and verification. Results: Gating was studied in three situations of lower, normal, and faster breathing at a respiratory cycle of 5, 15 and 25 breaths per minute, respectively. 4D treatment planning was performed at a normal breathing of 15 breaths per minute. The gated patterns obtained using the TrueBeam IR camera were compared with the planned ones while gating operation was added prior to delivery . Gating was realized only when the measured respiratory patterns matched to the planned ones. The gated target motion was verified within the tolerance by kV and MV imaging. Either free breathing CT or averaged CT images were studied to be good for image guidance to align the target. Conclusion: Gated RapidArc SBRT delivered with a 6MV FFF photon beam is realized using a dynamic lung phantom.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ganapin, D.J. Jr.
1987-01-01
Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less
A Personal Computer-Based Head-Spine Model
1998-09-01
the CHSM. CHSM was comprised of the pelvis, the thoracolumbar spine, a single beam representation of the cervical spine, the head, the rib cage , and...developing the private sector HSM-PC project follows the Phase II program Work Plan , but continues into a Phase m SBIR program internally funded by...on completing the head and neck portion of HSM-PC, which as described in the Confidence Assessment Plan (CA Plan ) will be known as the Head Cervical
Thomas, Judith C.; Lutz, Michelle A.; Bruce, Jennifer L.; Graczyk, David J.; Richards, Kevin D.; Krabbenhoft, David P.; Westenbroek, Stephen M.; Scudder, Barbara C.; Sullivan, Daniel J.; Bell, Amanda H.
2007-01-01
The Milwaukee Metropolitan Sewerage District (MMSD) Corridor Study is a three-phase project designed to improve the understanding of water resources in the MMSD planning area to assist managers and policy makers in their decisions. Phase I of the Study involved the compilation of existing data from multiple agencies into a single database. These data were analyzed to identify spatial, temporal, and technological gaps in the planning area, and were used to develop Phase II of the Study. Phase II, the subject of this report, involved an intensive data-collection effort by the U.S. Geological Survey (USGS) in cooperation with MMSD (from February, 2004, through September, 2005). This phase addressed the data gaps identified in Phase I and completed a baseline assessment of water quality for selected stream and harbor sites in the MMSD planning area. This baseline assessment included evaluations of surface-water chemistry and microbial concentrations in the streams and harbor sites; additionally, stream sites were evaluated for discharge, sediment chemistry, fish-tissue chemistry, habitat, and the quality of biological communities (including fish, macroinvertebrates, and algae). In all, data were collected at 15 stream and 6 harbor sites within the MMSD planning area, including manual sampling and analysis for more than 220 water-quality properties and constituents at all 21 sites, stream-discharge data for 14 stream sites, and automated water-quality sampling at 4 stream sites. A bioassessment during autumn 2004 included collection of biologic-community data and stream-habitat data at wadeable streams. Quartiles of Phase II aggregate bioassessment rankings were used to divide the 14 wadeable stream sites into four groups to investigate relations between bioassessment data and site characteristic and water-quality data. Quartile numbers reflect relative water quality: quartile 1 contained sites where the bioassessment data indicated the least-degraded water quality among those sampled, and quartile 4 contained sites that indicated the most-degraded water quality. Quartiles contained the following stream sites: Quartile 1: Milwaukee River near Cedarburg, Milwaukee River at Milwaukee, Jewel Creek, and Menomonee River at Menomonee Falls; Quartile 2: Willow Creek, Root River near Franklin, and Root River at Grange Avenue; Quartile 3: Menomonee River at Wauwatosa, Oak Creek, and Little Menomonee River; and Quartile 4: Honey Creek, Underwood Creek, Lincoln Creek, and Kinnickinnic River. Site characteristics (in this case, drainage area and land use) and selected water-quality data were summarized based on the four bioassessment quartiles to determine if there were relations with the aggregate bioassessment rankings. In general, sites having the largest drainage basins with the lowest proportion of urban land use were in quartile 1, and the smallest drainage basins with the highest proportion of urban land use were in quartile 4. Major ions, indicator organisms, and wastewater compounds generally had the lowest overall results in quartile 1 and highest overall results in quartile 4, with intermediate results in quartiles 2 and 3. Results for other constituent types (nutrients, mercury, pathogenic organisms, and bed sediment) were mixed, with results for some constituents decreasing from quartile 1 to quartile 4. Where sufficient Phase I data were available, summary statistics (including medians) for chemical and biological data were calculated, allowing some comparisons to be made between Phase I and Phase II data. Comparisons between Phase I and Phase II results indicated a variety of changes with respect to water quality. Concentrations of chloride, nitrate, chlorophyll a, total phosphorus in water; arsenic in bed sediment; and fish Index of Biotic Integrity ratings generally indicated declines in water quality. However, concentrations of total nitrogen, suspended sediment, and fecal coliform in water; some trace eleme
Team table: a framework and tool for continuous factory planning
NASA Astrophysics Data System (ADS)
Sihn, Wilfried; Bischoff, Juergen; von Briel, Ralf; Josten, Marcus
2000-10-01
Growing market turbulences and shorter product life cycles require a continuous adaptation of factory structures resulting in a continuous factory planning process. Therefore a new framework is developed which focuses on configuration and data management process integration. This enable an online system performance evaluation based on continuous availability of current data. The use of this framework is especially helpful and will guarantee high cost and time savings, when used in the early stages of the planning, called the concept or rough planning phase. The new framework is supported by a planning round table as a tool for team-based configuration processes integrating the knowledge of all persons involved in planning processes. A case study conducted at a German company shows the advantages which can be achieved by implementing the new framework and methods.
A manual for conducting environmental impact studies.
DOT National Transportation Integrated Search
1971-01-01
This report suggests methodologies which should enable an interdisciplinary team to assess community values. The methodologies are applicable to the conceptual, location, and design phases of highway planning, respectively. The approach employs a wei...
Roadwaste management : a tool for developing district plans.
DOT National Transportation Integrated Search
2000-10-01
The Oregon Department of Transportation (ODOT) conducted a study to examine roadwaste management options. Phase 1 consisted of a thorough review of regulations and standards, roadwaste characterization, current management practices, and new technolog...
The ten-ecosystem study investigation plan
NASA Technical Reports Server (NTRS)
Kan, E. P.
1976-01-01
With the continental United States divided into ten forest and grassland ecosystems, the Ten Ecosystem Study (TES) is designed to investigate the feasibility and applicability of state-of-the-art automatic data processing remote sensing technology to inventory forest, grassland, and water resources by using Land Satellite data. The study will serve as a prelude to a possible future nationwide remote sensing application to inventory forest and rangeland renewable resources. This plan describes project design and phases, the ten ecosystem, data utilization and output, personnel organization, resource requirements, and schedules and milestones.
1981-08-01
This item of local $1,901,000______ on Ocoe 90prc ees .J$190,000 on October 1980 price levels. ..$9,00 on October 1980 price levels. 6 cooperation...physical model in October 1980 . Initial testing of the recommended alternative was then started in November 1980 . However, because the model study could not...Appendix C of the Plan of Study for this project. Both the completed Plan of Study and the Stage 2 Document, July 1979 (revised April 1980 ) for this
Phase-locked loop with controlled phase slippage
Mestha, Lingappa K.
1994-01-01
A system for synchronizing a first subsystem controlled by a changing frequency sweeping from a first frequency to a second frequency, with a second subsystem operating at a steady state second frequency. Trip plan parameters are calculated in advance to determine the phase relationship between the frequencies of the first subsystem and second subsystem in order to obtain synchronism at the end of the frequency sweep of the first subsystem. During the time in which the frequency of the first subsystem is sweeping from the first frequency to the second frequency, the phase locked system compares the actual phase difference with the trip plan phase difference and incrementally changes the sweep frequency in a manner so that phase lock is achieved when the first subsystem reaches a frequency substantially identical to that of the second subsystem.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... methodological studies conducted during the Vanguard phase will inform the implementation and analysis plan for... Research Methodology Studies for the National Children's Study SUMMARY: In compliance with the requirement... Collection: Title: Environmental Science Formative Research Methodology Studies for the National Children's...
Defence Capability Plan 2006-2016
2006-06-14
and supply chain management ; and • developing strategies focussing on critical industry capabilities and Defence’s ability to manage supply and... managers undertake pre-approval study activity and prepare the necessary departmental documentation. More formal industry solicitation would continue...Defence Management Systems Improvement Less than $10m JP 2085 Phase 1B Explosive Ordnance Warstock $150m to $200m JP 2090 Phase 1B Combined Information
NASA Technical Reports Server (NTRS)
Wigley, D. A.
1985-01-01
Interrelated research and development activities, phased development of stepped specimen program are documented and a sequence for a specific program of machining, validation and heat treatment cycles for one material are described. Proposed work for the next phase of dimensional stability research is presented and further technology development activities are proposed.
CASSINI. Report on the Phase A study: Saturn Orbiter and Titan probe
NASA Technical Reports Server (NTRS)
1988-01-01
An in-depth, second phase exploration of Saturn is proposed. The scientific objectives involving Titan, Saturn's rings, icy satellites, magnetosphere, Jupiter, asteroids, and cruise science are covered. Other topics presented include: (1) the model payloads; (2) project requirements; (3) mission; (4) launch vehicle; (5) the orbiter system; (6) the Titan probe system; (7) mission operations; (8) management; and (9) development plan.
Strategic planning: getting from here to there.
Kaleba, Richard
2006-11-01
Hospitals should develop a strategic plan that defines specific actions in a realistic time frame. Hospitals can follow a five-phase process to develop a strategic plan. The strategic planning process requires a project leader and medical staff buy-in.
Least-cost transportation planning in ODOT : phase 2 final report.
DOT National Transportation Integrated Search
1996-06-01
This project is intended to suggest ways in which least-cost planning principles could be incorporated into the transportation planning process. The Mt. Hood corridor was chosen for examination. The examination of the planning process highlighted sev...
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated duringmore » the second phase of the W314 Project to cover the second phase of the project's scope.« less
Pan, Xiaoning; Zhang, Xiaodong; Li, Yupeng; Mohan, Radhe; Liao, Zhongxing
2009-02-01
To study the impact of selecting different data sets from four-dimensional computed tomography (4D CT) imaging during proton treatment planning in patients with distal esophageal cancer. We examined the effects of changes in 4D CT data set and smearing margins in proton treatment planning for 5 patients with distal esophageal cancer whose diaphragms were in the beam path and could move several centimeters during respiration. Planning strategies based on (1) average, (2) inspiration, and (3) expiration CT were evaluated in terms of their coverage on the internal clinic target volume (ICTV) at the prescribed dose. For Strategy 1, increasing the smearing margin caused an increase in the ICTV prescription dose coverage (PDC) at the end-exhalation phase for all patients, whereas the ICTV PDC decreased for some patients at the end-inhalation phase. For Strategy 2, a smearing margin in the range of 1.0 to 3.5 cm caused the ICTV PDC to remain essentially unchanged, regardless of which phase of 4D CT was used for dose calculation, for all patients. For Strategy 3, the ICTV coverage was adequate for 2 of the 5 patients when a smearing margin of less than 1.0 cm was used, but was not adequate for the other 3 patients regardless of the smearing margin. Using the inspiration CT plus a smearing margin can lead to adequate ICTV coverage in treatment plans for patients with distal esophageal tumors surrounded by tissue that is subject to large changes in density during a proton treatment.
Final Report of Tank 241-C-105 Dissolution, the Phase 2 Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meznarich, Huei K.; bolling, Stacey D.; Cooke, Gary A.
2016-10-01
Three clamshell grab samples were taken from Tank 241-C-105 in October 2015 in accordance with RPP-PLAN-60011. Analytical results of those samples were issued in the report RPP-RPT-59115 by Wastren Advantage, Inc., Hanford Laboratory. Solid phase characterization results were reported separately in LAB-RPT-15-00011 and in RPP-RPT-59147. The major solid phases reported to be present were dawsonite [NaAlCO 3(OH) 2], trona [Na 3(HCO 3)(CO 3)·2H 2O], cejkaite [Na 4(UO 2)(CO 3) 3], and an unidentified organic solid, with minor amounts of gibbsite [Al(OH) 3], natrophosphate [Na 7F(PO 4) 2·19H 2O], and traces of unidentified iron-rich and manganese-rich phases. Note that the presencemore » of dawsonite, trona, and cejkaite requires a relatively low pH, likely around pH 9 to 10. One aliquot of each grab sample was provided to 222-S Laboratory Process Chemistry for dissolution studies. Phase 1 of the dissolution testing followed the approved test plan, WRPS-1404813, Rev. 3, and examined the behavior of the Tank 241-C-105 solids treated with water, 19M sodium hydroxide, 2M nitric acid, and 0.5M oxalic acid/2M nitric acid. Phase 2 of the testing was conducted in accordance with instructions from the client and emphasized treatment with 19M sodium hydroxide followed by water washing. This is the report of the Phase 2 testing.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yavas, Oe.
The Turkish Accelerator Center (TAC) Project was started in 1997 with support of the State Planning Organization (SPO) of Turkey under Ankara University's coordination. After completing Feasibility Report (FR, 2000) and Conceptual Design Repot (CDR, 2005), third phase of the project was started in 2006 as an inter-university project with support of SPO. Third phase of the project has two main scientific goals: to write Technical Design Report (TDR) of TAC and to establish an Infrared Free Electron Laser (IR FEL) facility as a first step. The first facility and TDR studies are planned to be completed in 2012. Constructionmore » phase of TAC will cover 2013-2023. TAC collaboration include ten Turkish Universities: Ankara, Gazi, Istanbul, Bogazici, Dogus, Uludag, Dumlupmar, Nigde, Erciyes and S. Demirel Universities. It was planned that the first facility will be an IR FEL and Bremsstrahlung laboratory based on 15-40 MeV electron linac and two optical cavities with 2.5 and 9 cm undulators to scan 2-250 microns wavelength range. Main purpose of the facility is to use IR FEL for research in material science, nonlinear optics, semiconductors, biotechnology, medicine and photochemical processes. In this study; aims, regional importance, main parts and main parameters of TAC and TAC IR FEL and Bremsstrahlung facility are explained. Road map of the TAC project is given. National and international collaborations are explained.« less
Imaging Depression in Adults with ASD
2017-10-01
collected temporally close enough to imaging data in Phase 2 to be confidently incorporated in the planned statistical analyses, and (b) not unduly risk...Phase 2 to be confidently incorporated in the planned statistical analyses, and (b) not unduly risk attrition between Phase 1 and 2, we chose to hold...supervision is ongoing (since 9/2014). • Co-l Dr. Lerner’s 2nd year Clinical Psychology PhD students have participated in ADOS- 2 Introductory Clinical
[Progress and Future of the Training Plan for Cancer Professionals - Looking Back for 10 Years].
Matsuura, Nariaki
2017-06-01
In order to increase cancer professionals in Japan, the first phase of training plan for cancer professionals was performed for 5 years from 2007t o 2011, and the second one was performed for 5 years from 2012 to 2016. 95 universities for 18 hubs in the first phase and 100 universities for 15 hubs in the second one participated in this project 2,590 graduate students in the first phase and 2,319 students for 3 years in the second phase learned. Although the number of cancer professionals increased after the start of this project, it is still half of the set points and more efforts are required for this project. From 2017, the new training plan for cancer professionals will start for the third phase, and various professionals such as genome medicine professionals, rare cancer professionals, pediatric cancer professionals and those for the life-stage problems in cancer patients will be educated.
LST phase A design update study
NASA Technical Reports Server (NTRS)
1973-01-01
An update is presented of the Phase A study of the Large Space Telescope (LST), based on changes in guidelines and new data developed subsequent to the Phase A study. The study defines an LST concept based on the broad mission guidelines provided by the Office of Space Science (OSS), the scientific requirements developed by OSS with the scientific community, and an understanding of long range NASA planning current at the time the study was performed. A low cost design approach was followed. This resulted in the use of standard spacecraft hardware, the provision for maintenance at the black box level, growth potential in systems designs, and sharing of shuttle maintenance flights with other payloads (See N73-18449 through N73-18453)
Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye
2016-01-01
This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively. PMID:27271840
Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S; Phoon, Sin Ye
2016-06-07
This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.
NASA Astrophysics Data System (ADS)
Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye
2016-06-01
This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.
Space station needs, attributes and architectural options study. Volume 1: Executive study
NASA Technical Reports Server (NTRS)
1983-01-01
Mission identification and validation, the benefits of a manned presence in space; attributes and architectures; time-phased mission and system requirements imposed on the space station; orbit selection; space station architectural options; technology selection; and program planning are addressed.
East-West transport corridor feasibility study : phase 1, vol. 2 : development plans : final report
DOT National Transportation Integrated Search
1998-04-01
This study, conducted by Bechtel International, was funded by the U.S. Trade and Development Agency. The member countries of the South Balkan Initiative Program (Albania, Macedonia, and Bulgaria) are seeking to improve their transportation infrastruc...
VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.
ERIC Educational Resources Information Center
Baldus, Lorayne; Nelson, Orville
The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…
Complex Development Report: Moanalua High School.
ERIC Educational Resources Information Center
Anbe, Aruga and Ishizu, Architects, Inc., Honolulu, HI.
This report documents the planning process and the decisions involved in master planning a proposed Honolulu high school, and it provides guidance for the implementation of those increments remaining after phase one of the first increment had been completed in September 1972. Phase two of the first increment and the second increment are now under…
Modular space station phase B extension program master plan
NASA Technical Reports Server (NTRS)
Munsey, E. H.
1971-01-01
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
42 CFR 137.20 - What is required during the planning phase?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What is required during the planning phase? 137.20 Section 137.20 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Selection of Indian Tribes for...
42 CFR 137.20 - What is required during the planning phase?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false What is required during the planning phase? 137.20 Section 137.20 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Selection of Indian Tribes for...
ERIC Educational Resources Information Center
DeBlasi, Robert V.
Guidelines of a four-phase model for conducting leadership conferences are outlined. Phase I focuses on initial conference planning, including (1) identifying need and purpose for the conference; (2) selecting a conference chairperson; (3) forming the conference planning committee, listing suggested committees and their responsibilities (program,…
Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.
CREATING: a sustainable plan for biomedical higher education in Saudi Arabia. Phase I
Cirillo, Nicola; AlShwaimi, Emad; Prime, Stephen S.; Al-Hayani, Abdulmonem
2015-01-01
Biomedical higher education has been acquiring increasing importance worldwide, including the Kingdom of Saudi Arabia, and effective strategies to improve outcomes and competitiveness are key for academic success. The plan presented here is divided into two major phases. Phase 1 (Communication, Research governance, Education planning, Accreditation) deals mainly with adopting a systematic approach to academic activities according to the current international standards. In other words, the aim is to re-organise what is already in place, taking into account current guidelines and strategies that help improve quality of education and research. It is suggested that this is not necessarily to be achieved by major investments but, rather, by a more imaginative and structured work plan. In Phase 2 (Translational practice, Implementation, Networking, Growth), higher education institutions are expected to invest in new strategic resources, to establish strong reciprocal links with international academic partners and industry, and to shift their attention to the hot topics and current academic challenges, leading the way in translational education models and pioneering cutting-edge research. PMID:25901139
42 CFR 137.25 - Are planning and negotiation grants available?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Are planning and negotiation grants available? 137... for Participation in Self-Governance Planning Phase § 137.25 Are planning and negotiation grants... planning and negotiation grants available, an explanation of the application process for such grants, and...
42 CFR 137.25 - Are planning and negotiation grants available?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Are planning and negotiation grants available? 137... for Participation in Self-Governance Planning Phase § 137.25 Are planning and negotiation grants... planning and negotiation grants available, an explanation of the application process for such grants, and...
42 CFR 137.25 - Are planning and negotiation grants available?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Are planning and negotiation grants available? 137... for Participation in Self-Governance Planning Phase § 137.25 Are planning and negotiation grants... planning and negotiation grants available, an explanation of the application process for such grants, and...
42 CFR 137.25 - Are planning and negotiation grants available?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Are planning and negotiation grants available? 137... for Participation in Self-Governance Planning Phase § 137.25 Are planning and negotiation grants... planning and negotiation grants available, an explanation of the application process for such grants, and...
42 CFR 137.25 - Are planning and negotiation grants available?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Are planning and negotiation grants available? 137... for Participation in Self-Governance Planning Phase § 137.25 Are planning and negotiation grants... planning and negotiation grants available, an explanation of the application process for such grants, and...
TU-E-BRB-08: Dual Gated Volumetric Modulated Arc Therapy.
Wu, J; Fahimian, B; Wu, H; Xing, L
2012-06-01
Gated Volumetric Modulated Arc Therapy (VMAT) is an emerging treatment modality for Stereotactic Body Radiotherapy (SBRT). However, gating significantly prolongs treatment time. In order to enhance treatment efficiency, a novel dual gated VMAT, in which dynamic arc deliveries are executed sequentially in alternating exhale and inhale phases, is proposed and evaluated experimentally. The essence of dual gated VMAT is to take advantage of the natural pauses that occur at inspiration and exhalation by alternatively delivering the dose at the two phases, instead of the exhale window only. The arc deliveries at the two phases are realized by rotating gantry forward at the exhale window and backward at the inhale in an alternative fashion. Custom XML scripts were developed in Varian's TrueBeam STx Developer Mode to enable dual gated VMAT delivery. RapidArc plans for a lung case were generated for both inhale and exhale phases. The two plans were then combined into a dual gated arc by interleaving the arc treatment nodes of the two RapidArc plans. The dual gated plan was delivered in the development mode of TrueBeam LINAC onto a motion phantom and the delivery was measured by using pinpoint chamber/film/diode array (delta 4). The measured dose distribution was compared with that computed using Eclipse AAA algorithm. The treatment delivery time was recorded and compared with the corresponding single gated plans. Relative to the corresponding single gated delivery, it was found that treatment time efficiency was improved by 95.5% for the case studied here. Pinpoint chamber absolute dose measurement agreed the calculation to within 0.7%. Diode chamber array measurements revealed that 97.5% of measurement points of dual gated RapidArc delivery passed the 3% and 3mm gamma-test criterion. A dual gated VMAT treatment has been developed and implemented successfully with nearly doubled treatment delivery efficiency. © 2012 American Association of Physicists in Medicine.
Norouzi, Saiideh; Moghaddam, Mohammad Hossein Baghiani; Morowatisharifabad, Mohammad Ali; Norouzi, Ali; Jafari, Ali Reza; Fallahzadeh, Hossein
2015-01-01
Identification of parenting skills determinants among mothers is an ongoing field of research. The aim of this study was to identify the social cognitive predictors of parenting skills among mothers. Previous studies have demonstrated the health action process approach (HAPA) as a credible frame for predicting behavior, but the number of studies considering the predictive value of parenting skills determinants among mothers is rare. An 8 months prospective design was applied. Participants were mothers with preschool and early elementary school-aged children. At the 1(st) time, 120 participants completed self-report questionnaires regarding their risk perception, outcome expectancies, task self-efficacy, and intentions toward parenting skills. At the 2(nd) time, they returned a follow-up questionnaire, which measured planning, coping self-efficacy, and recovery self-efficacy and finally, 8 months later as the 3(rd) time, parenting skills were measured. Path analysis was used for analysis. Path analysis indicated that, in the motivational phase, there was no relationship between parenting skills intention and risk perception, outcome expectancies, and task self-efficacy. Furthermore, no relationship was found between parenting skills intention and planning. In the volitional phase, coping self-efficacy, recovery self-efficacy, and planning were statistically significant predictors of parenting skills. The results of this study confirm that volitional phase of the HAPA model is useful in determining parenting skills. However, the role motivational variables seem to be unimportant in performing these behaviors. It was concluded that everybody intended to apply parenting skills, in nature, and intervention strategies should be focused on turning intentions into behavior.
NASA Astrophysics Data System (ADS)
After completion of the field phase of WAMEX, operations were assessed, further planning of data management activities was reviewed, and plans for the research and evaluation phase were coordinated. The WAMEX project was conducted concurrently with the first GARP Global Experiment. Impending data collection and processing activities are stressed in plans to promote the timely and complete analysis of the present situation. The advantages to be gained through international cooperation among scientists are emphasized.
King, E A; Murphy, E; Rice, H J
2011-03-01
The first phase of noise mapping and action planning in Ireland, in accordance with EU Directive 2002/49/EC, is now complete. In total this included one agglomeration, one airport and approximately 600 km of major roads outside the agglomeration. These noise maps describe the level of noise exposure of approximately 1.25 million people. The first phase of noise mapping was dealt with by five noise mapping bodies while 26 action planning authorities were involved in the development of the associated action plans. The second phase of noise mapping, due to be completed in 2012, sees a reduction in the defined thresholds describing the required agglomerations, roads and railways that have to be mapped. This will have a significant impact on the extent of mapping required. In Ireland this will result in an increased number of local authorities being required to develop strategic noise maps for their area along with the further development of associated action plans. It is appropriate at this point to review the work process and results from the first phase of noise mapping in Ireland in order to establish areas that could be improved, throughout the noise mapping project. In this paper a review of the implementation procedures focussing on (dominant) road traffic noise is presented. It is identified that more standardisation is needed and this could be achieved by the establishment of a national expert steering group. Copyright © 2010 Elsevier Ltd. All rights reserved.
A strategic plan for the second phase (2013-2015) of the Korea biobank project.
Park, Ok; Cho, Sang Yun; Shin, So Youn; Park, Jae-Sun; Kim, Jun Woo; Han, Bok-Ghee
2013-04-01
The Korea Biobank Project (KBP) was led by the Ministry of Health and Welfare to establish a network between the National Biobank of Korea and biobanks run by university-affiliated general hospitals (regional biobanks). The Ministry of Health and Welfare started the project to enhance medical and health technology by collecting, managing, and providing researchers with high-quality human bioresources. The National Biobank of Korea, under the leadership of the Ministry of Health and Welfare, collects specimens through various cohorts and regional biobanks within university hospitals gather specimens from patients. The project began in 2008, and the first phase ended in 2012, which meant that there needed to be a plan for the second phase that begins in 2013. Consequently, professionals from within and outside the project were gathered to develop a plan for the second phase. Under the leadership of the planning committee, six working groups were formed to formulate a practical plan. By conducting two workshops with experts in the six working groups and the planning committee and three forums in 2011 and 2012, they have developed a strategic plan for the second phase of the KBP. This document presents a brief report of the second phase of the project based on a discussion with them. During the first phase of the project (2008-2012), a network was set up between the National Biobank of Korea and 17 biobanks at university-affiliated hospitals in an effort to unify informatics and governance among the participating biobanks. The biobanks within the network manage data on their biospecimens with a unified Biobank Information Management System. Continuous efforts are being made to develop a common standard operating procedure for resource collection, management, distribution, and personal information security, and currently, management of these data is carried out in a somewhat unified manner. In addition, the KBP has trained and educated professionals to work within the biobanks, and has also carried out various publicity promotions to the public and researchers. During the first phase, biospecimens from more than 300,000 participants through various cohorts and biospecimens from more than 200,000 patients from hospitals were collected, which were distributed to approximately 600 research projects. The planning committee for the second phase evaluated that the first phase of the KBP was successful. However, the first phase of the project was meant to allow autonomy to the individual biobanks. The biobanks were able to choose the kind of specimens they were going to collect and the amount of specimen they would set as a goal, as well as being allowed to choose their own methods to manage their biobanks (autonomy). Therefore, some biobanks collected resources that were easy to collect and the resources needed by researchers were not strategically collected. In addition, there was also a low distribution rate to researchers outside of hospitals, who do not have as much access to specimens and cases as those in hospitals. There were also many cases in which researchers were not aware of the KBP, and the distribution processes were not set up to be convenient to the demands of researchers. Accordingly, the second phase of the KBP will be focused on increasing the integration and cooperation between the biobanks within the network. The KBP plans to set goals for the strategic collection of the needed human bioresources. Although the main principle of the first phase was to establish infrastructure and resource collection, the key objective of the second phase is the efficient utilization of gathered resources. In order to fully utilize the gathered resources in an efficient way, distribution systems and policies must be improved. Vitalization of distribution, securing of high-value resource and related clinical and laboratory information, international standardization of resource management systems, and establishment of a virtuous cycle between research and development (R&D) and biobanks are the four main strategies. Based on these strategies, 12 related objectives have been set and are planned to be executed.
Yi, B; Yang, X; Niu, Y; Yu, C
2012-06-01
Conformal SBRT plans for Lung cancer with static gantry angles are ideal candidates for applying motion tracking because of: (1) better dosimetric conformity with reduced target margin and (2) easier and more faithful target tracking without intensity modulation. This work is to demonstrate that by delivering the target tracking during gantry rotation, we can significantly improve delivery efficiency without negatively affecting plan quality. A lung SBRT plan with static beams was created using CT images of the reference breathing phase. It is converted to an arc plan with variable dose rate followed by the conversion to a 4D plan with the segment aperture morphing (SAM) method (Gui 2010) with considerations of both target location and shape changes as depicted by the 4D CT. Gantry angle ranges were determined from the clinical monitor units, with the 22.2 MU/degree, which is chosen to maximize the dose rate. All segments of the dynamic 4D plan were merged into a single arc with variable dose rate. Each segment occupying 1/10 of the breathing period delivers 6.6 MUs at a dose rate of 1000 MU/min. Delivery time was measured and compared to the planned. The dose distributions of the single phase 3D plan and the arc 4D plan showed little difference. The delivered time for the 4D arc plan agreed with the calculated time, and is almost the same as delivering the 3D plan without target tracking. A 12 Gy treatment takes less than 2.5 min. The feasibility of a novel 4D delivery method where a 3D SBRT plan is converted into 4D arc delivery has been demonstrated. In addition to realizing the conventional target tracking benefits, our method further improves delivery efficiency, which is important for maintaining the geometric relationship between the target motion and the breathing surrogate during treatment. This study is supported by NIH_Grant_1R01CA133539-01 A2. © 2012 American Association of Physicists in Medicine.
Intelligent Engine Systems: Bearing System
NASA Technical Reports Server (NTRS)
Singh, Arnant P.
2008-01-01
The overall requirements necessary for sensing bearing distress and the related criteria to select a particular rotating sensor were established during the phase I. The current phase II efforts performed studies to evaluate the Robustness and Durability Enhancement of the rotating sensors, and to design, and develop the Built-in Telemetry System concepts for an aircraft engine differential sump. A generic test vehicle that can test the proposed bearing diagnostic system was designed, developed, and built. The Timken Company, who also assisted with testing the GE concept of using rotating sensors for the differential bearing diagnostics during previous phase, was selected as a subcontractor to assist General Electric (GE) for the design, and procurement of the test vehicle. A purchase order was prepared to define the different sub-tasks, and deliverables for this task. The University of Akron was selected to provide the necessary support for installing, and integrating the test vehicle with their newly designed test facility capable of simulating the operating environment for the planned testing. The planned testing with good and damaged bearings will be on hold pending further continuation of this effort during next phase.
The Development of a Telemedicine Planning Framework Based on Needs Assessment.
AlDossary, Sharifah; Martin-Khan, Melinda G; Bradford, Natalie K; Armfield, Nigel R; Smith, Anthony C
2017-05-01
Providing equitable access to healthcare services in rural and remote communities is an ongoing challenge that faces most governments. By increasing access to specialty expertise, telemedicine may be a potential solution to this problem. Regardless of its potential, many telemedicine initiatives do not progress beyond the research phase, and are not implemented into mainstream practice. One reason may be that some telemedicine services are developed without the appropriate planning to ascertain community needs and clinical requirements. The aim of this paper is to report the development of a planning framework for telemedicine services based on needs assessment. The presented framework is based on the key processes in needs assessment, Penchansky and Thomas's dimensions of access, and Bradshaw's types of need. This proposed planning framework consists of two phases. Phase one comprises data collection and needs assessment, and includes assessment of availability and expressed needs; accessibility; perception and affordability. Phase two involves prioritising the demand for health services, balanced against the known limitations of supply, and the implementation of an appropriate telemedicine service that reflects and meets the needs of the community. Using a structured framework for the planning of telemedicine services, based on need assessment, may help with the identification and prioritisation of community health needs.
NASA Technical Reports Server (NTRS)
Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.
1987-01-01
The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Teke, T; Milette, MP; Huang, V
2014-08-15
The interplay effect between the tumor motion and the radiation beam modulation during a VMAT treatment delivery alters the delivered dose distribution from the planned one. This work present and validate a method to accurately calculate the dose distribution in 4D taking into account the tumor motion, the field modulation and the treatment starting phase. A QUASAR™ respiratory motion phantom was 4D scanned with motion amplitude of 3 cm and with a 3 second period. A static scan was also acquired with the lung insert and the tumor contained in it centered. A VMAT plan with a 6XFFF beam wasmore » created on the averaged CT and delivered on a Varian TrueBeam and the trajectory log file was saved. From the trajectory log file 10 VMAT plans (one for each breathing phase) and a developer mode XML file were created. For the 10 VMAT plans, the tumor motion was modeled by moving the isocentre on the static scan, the plans were re-calculated and summed in the treatment planning system. In the developer mode, the tumor motion was simulated by moving the couch dynamically during the treatment. Gafchromic films were placed in the QUASAR phantom static and irradiated using the developer mode. Different treatment starting phase were investigated (no phase shift, maximum inhalation and maximum exhalation). Calculated and measured isodose lines and profiles are in very good agreement. For each starting phase, the dose distribution exhibit significant differences but are accurately calculated with the methodology presented in this work.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waite, J.L.
1996-04-12
This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less
Space Shuttle flying qualities and flight control system assessment study, phase 2
NASA Technical Reports Server (NTRS)
Myers, T. T.; Johnston, D. E.; Mcruer, D. T.
1983-01-01
A program of flying qualities experiments as part of the Orbiter Experiments Program (OEX) is defined. Phase 1, published as CR-170391, reviewed flying qualities criteria and shuttle data. The review of applicable experimental and shuttle data to further define the OEX plan is continued. An unconventional feature of this approach is the use of pilot strategy model identification to relate flight and simulator results. Instrumentation, software, and data analysis techniques for pilot model measurements are examined. The relationship between shuttle characteristics and superaugmented aircraft is established. STS flights 1 through 4 are reviewed from the point of view of flying qualities. A preliminary plan for a coordinated program of inflight and simulator research is presented.
Constructing a modern cytology laboratory: A toolkit for planning and design.
Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A
2013-01-01
Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.
Constructing a modern cytology laboratory: A toolkit for planning and design
Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.
2013-01-01
Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722
ERIC Educational Resources Information Center
Malinconico, S. Michael
1984-01-01
Discusses planning for the implementation of a high technology system which includes plans for how it will be phased out and an orderly transition made to its successor. System life expectations, user pressures, software modifications, commercial vendors, integrated systems, eroding economies, and replacement planning are highlighted. (EJS)
Phase-locked loop with controlled phase slippage
Mestha, L.K.
1994-03-29
A system for synchronizing a first subsystem controlled by a changing frequency sweeping from a first frequency to a second frequency, with a second subsystem operating at a steady state second frequency is described. Trip plan parameters are calculated in advance to determine the phase relationship between the frequencies of the first subsystem and second subsystem in order to obtain synchronism at the end of the frequency sweep of the first subsystem. During the time in which the frequency of the first subsystem is sweeping from the first frequency to the second frequency, the phase locked system compares the actual phase difference with the trip plan phase difference and incrementally changes the sweep frequency in a manner so that phase lock is achieved when the first subsystem reaches a frequency substantially identical to that of the second subsystem. 10 figures.
Vestibular Function Research (VFR) experiment. Phase B: Design definition study
NASA Technical Reports Server (NTRS)
1978-01-01
The Vestibular Functions Research (VFR) Experiment was established to investigate the neurosensory and related physiological processes believed to be associated with the space flight nausea syndrome and to develop logical means for its prediction, prevention and treatment. The VFR Project consists of ground and spaceflight experimentation using frogs as specimens. The phase B Preliminary Design Study provided for the preliminary design of the experiment hardware, preparation of performance and hardware specification and a Phase C/D development plan, establishment of STS (Space Transportation System) interfaces and mission operations, and the study of a variety of hardware, experiment and mission options. The study consist of three major tasks: (1) mission mode trade-off; (2) conceptual design; and (3) preliminary design.
DOT National Transportation Integrated Search
1979-10-01
The major goal of the second phase was to estimate the absolute comfort levels which would be associated with actual travel on highspeed, interurban, fixed-guideway, transportation systems. To accomplish this goal, the study design incorporated many ...
Liu, Wei; Schild, Steven E.; Chang, Joe Y.; Liao, Zhongxing; Chang, Yu-Hui; Wen, Zhifei; Shen, Jiajian; Stoker, Joshua B.; Ding, Xiaoning; Hu, Yanle; Sahoo, Narayan; Herman, Michael G.; Vargas, Carlos; Keole, Sameer; Wong, William; Bues, Martin
2015-01-01
Background To compare the impact of uncertainties and interplay effect on 3D and 4D robustly optimized intensity-modulated proton therapy (IMPT) plans for lung cancer in an exploratory methodology study. Methods IMPT plans were created for 11 non-randomly selected non-small-cell lung cancer (NSCLC) cases: 3D robustly optimized plans on average CTs with internal gross tumor volume density overridden to irradiate internal target volume, and 4D robustly optimized plans on 4D CTs to irradiate clinical target volume (CTV). Regular fractionation (66 Gy[RBE] in 33 fractions) were considered. In 4D optimization, the CTV of individual phases received non-uniform doses to achieve a uniform cumulative dose. The root-mean-square-dose volume histograms (RVH) measured the sensitivity of the dose to uncertainties, and the areas under the RVH curve (AUCs) were used to evaluate plan robustness. Dose evaluation software modeled time-dependent spot delivery to incorporate interplay effect with randomized starting phases of each field per fraction. Dose-volume histogram indices comparing CTV coverage, homogeneity, and normal tissue sparing were evaluated using Wilcoxon signed-rank test. Results 4D robust optimization plans led to smaller AUC for CTV (14.26 vs. 18.61 (p=0.001), better CTV coverage (Gy[RBE]) [D95% CTV: 60.6 vs 55.2 (p=0.001)], and better CTV homogeneity [D5%–D95% CTV: 10.3 vs 17.7 (p=0.002)] in the face of uncertainties. With interplay effect considered, 4D robust optimization produced plans with better target coverage [D95% CTV: 64.5 vs 63.8 (p=0.0068)], comparable target homogeneity, and comparable normal tissue protection. The benefits from 4D robust optimization were most obvious for the 2 typical stage III lung cancer patients. Conclusions Our exploratory methodology study showed that, compared to 3D robust optimization, 4D robust optimization produced significantly more robust and interplay-effect-resistant plans for targets with comparable dose distributions for normal tissues. A further study with a larger and more realistic patient population is warranted to generalize the conclusions. PMID:26725727
A synopsis of test results and knowledge gained from the Phase-0 CSI evolutionary model
NASA Technical Reports Server (NTRS)
Belvin, W. Keith; Elliott, Kenny B.; Horta, Lucas G.
1993-01-01
The Phase-0 CSI Evolutionary Model (CEM) is a testbed for the study of space platform global line-of-sight (LOS) pointing. Now that the tests have been completed, a summary of hardware and closed-loop test experiences is necessary to insure a timely dissemination of the knowledge gained. The testbed is described and modeling experiences are presented followed by a summary of the research performed by various investigators. Some early lessons on implementing the closed-loop controllers are described with particular emphasis on real-time computing requirements. A summary of closed-loop studies and a synopsis of test results are presented. Plans for evolving the CEM from phase 0 to phases 1 and 2 are also described. Subsequently, a summary of knowledge gained from the design and testing of the Phase-0 CEM is made.
NASA Astrophysics Data System (ADS)
Yeo, U. J.; Taylor, M. L.; Kron, T.; Pham, D.; Siva, S.; Franich, R. D.
2013-06-01
Respiratory motion induces dosimetric uncertainties for thoracic and abdominal cancer radiotherapy (RT) due to deforming and moving anatomy. This study investigates the extent of dosimetric differences between conventional 3D treatment planning and path-integrated 4D treatment planning in liver stereotactic body radiotherapy (SBRT). Respiratory-correlated 4DCT image sets with 10 phases were acquired for patients with liver tumours. Path-integrated 4D dose accumulation was performed using dose-warping techniques based on deformable image registration. Dose-volume histogram analysis demonstrated that the 3D planning approach overestimated doses to targets by up to 24% and underestimated dose to normal liver by ~4.5%, compared to the 4D planning methodology. Therefore, 4D planning has the potential to quantify such issues of under- and/or over-dosage and improve treatment accuracy.
Food selection criteria for disaster response planning in urban societies.
Wien, Michelle; Sabaté, Joan
2015-05-12
Nutrition professionals that have menu planning and disaster management responsibilities should consider factors that have transcended from ancient to current times, in addition to recognizing societal trends that have led to our current increased vulnerability in the event of a disaster. Hence, we proceeded to develop a set of "Disaster Response Diets" (DRDs) for use in urban societies inclusive of the aforementioned considerations. A three-phase multidimensional approach was used to identify food groups suitable for creating a set of DRDs. Phase One consisted of calculating the percent daily nutrient intake and Drewnowski's naturally nutrient rich (NNR) score for an individual or mean composite for one serving of food from 11 specific food groups. In Phase Two, in addition to nutrient density, the 11 food groups were evaluated and scored based on the following DRD planning criteria: storage and handling properties, preparation ease and, cultural acceptance/individual tolerance. During Phase Three, three DRDs were developed based upon the data retrieved from Phases one and two. In Phase One, the NNR scores ranged from 2.1 for fresh fruits to 28.1 for dry cereals, a higher score indicating a higher nutrient density. During Phase Two, a maximum score of 12 was possible based on appropriateness for a disaster situation. Five plant-based food groups (dry cereals, nuts, dried fruits, grains and legumes) achieved a score ranging between 7 and 12, whereas the five fresh food groups were deemed ineligible due to sanitation and perishability concerns. During Phase Three, three DRDs (milk-inclusive, milk-free and Grab-and-Go) were developed as benchmarks for disaster response planning. Plant-based DRDs are universally acceptable and tolerated across cultures and religions. Therefore, we suggest nutrition professionals consider using a plant-based approach for creating DRDs for public health institutions and organizations.
Chloropicrin Fumigant Management Plan Phase 2 Templates
These forms provide a framework for detailing the FMP elements of pesticide products containing the active ingredient chloropicrin, including application block, buffer zones, emergency response plan, tarp plan, soil conditions, and air monitoring.
Working in partnership: the application of shared decision-making to health visitor practice.
Astbury, Ruth; Shepherd, Ashley; Cheyne, Helen
2017-01-01
To explore the processes that support shared decision-making when health visitors and parents are creating plans to improve the well-being of babies and children. Worldwide, there is a focus on promoting children's well-being to enhance the population health. Within the United Kingdom, health visitors have a key responsibility for working in partnership with parents to support this agenda. Despite evidence that the application of 'shared decision-making' frameworks can increase patient participation, improve patient satisfaction and improve health outcomes, there is limited research linking shared decision-making with health visitor practice. A qualitative, descriptive study. The study was undertaken in two phases: in Phase 1, data were collected by audio recording two health visitor-parent decision-making conversations, in the absence of the researcher, where decisions around planning for a baby or child were being made as part of usual care, and then the participants' experiences were sought through individual questionnaires. In Phase 2, semistructured interviews were conducted with nine health visitors and nine parents in relation to their recent experiences of planning care. Evidence of supportive processes included having a shared understanding around the issue needing to be addressed; being able to identify interventions that were accessible for the family; engaging in decision-making through deep, meaningful conversations using sensitive and responsive approaches; and establishing positive relationships between health visitors and parents, significant others within the family and other professionals. Despite evidence of strong, trusting relationships between parents and health visitors, there were times when shared decision-making was unable to take place due to the absence of supportive processes. Health visitors are aware that planning interventions with parents can be complex. These findings indicate the value of using a shared decision-making framework to structure planning, as application of a framework identified the processes that support a collaborative approach in practice. © 2016 John Wiley & Sons Ltd.
SU-F-P-03: Management of Time to Treatment Inititation: Case for An Electronic Whiteboard
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adnani, N
2016-06-15
Purpose: To determine if data mining of an electronic whiteboard improves the management of the Time to Treatment Initiation (TTI) in radiation oncology. Methods: An electronic whiteboard designed to help in managing the planning workflow and improves communication regarding patient planning progress was used to record the dates at which each phase of the planning process began or completed. These are CT Sim date, Plan Start, Physician Review, Physicist Review, Approval for Treatment Delivery, Setup or Verification of Simulation. Results: During clinical implementation, the electronic whiteboard was able to fulfill its primary objective of providing a transparent account of themore » planning progress of each patient. Peer pressure also meant that individual tasks, such as contouring, were easily brought to the attention of the responsible party and prioritized accordingly. Data mining to analyze the electronic whiteboard per patient (figure 1), per diagnosis (figure 2), per treatment modality (figure 3), per physician (figure 4), per planner (figure 5), etc., added another sophisticated tool in the management of Time to Treatment Initiation without compromising quality of the plans being generated. A longer than necessary time between CT Sim and Plan Start can be discussed among the members of the treatment team as an indication of inadequate/outdated CT Simulator, Contouring Tools, Image Fusion Tools, Other Imaging Studies (MRI, PET/CT) performed, etc. The same for the Plan Start to Physician Review where an extended time than expected may be due unrealistic planning goals, limited planning system features, etc. Conclusion: An Electronic Whiteboard in radiation oncology is not only helping with organizing planning workflow, it is also a potent tool that can be used to reduce the Time to Treatment Initiation by providing the clinic with hard data about the duration of each phase treatment planning as a function of different variable affecting the planning process. The work is supported by the Global Medical Physics Institute.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Macchia, Gabriella, E-mail: gmacchia@rm.unicatt.i; Cilla, Savino M.P.; Ferrandina, Gabriella
2010-04-15
Purpose: To determine the maximum tolerated dose of short-course radiotherapy (intensity-modulated radiotherapy technique) to the upper two thirds of the vagina in endometrial cancers with low risk of local recurrence. Patients and Methods: A Phase I clinical trial was performed. Eligible patients had low-risk resected primary endometrial adenocarcinomas. Radiotherapy was delivered in 5 fractions over 1 week. The planning target volume was the clinical target volume plus 5 mm. The clinical target volume was defined as the upper two thirds of the vagina as evidenced at CT simulation by a vaginal radio-opaque device. The planning target volume was irradiated bymore » a seven-field intensity-modulated radiotherapy technique, planned by the Plato Sunrise inverse planning system. A first cohort of 6 patients received 25 Gy (5-Gy fractions), and a subsequent cohort received 30 Gy (6-Gy fractions). The Common Toxicity Criteria scale, version 3.0, was used to score toxicity. Results: Twelve patients with endometrial cancer were enrolled. Median age was 58 years (range, 49-74 years). Pathologic stage was IB (83.3%) and IC (16.7%). Median tumor size was 30 mm (range, 15-50 mm). All patients completed the prescribed radiotherapy. No patient experienced a dose-limiting toxicity at the first level, and the radiotherapy dose was escalated from 25 to 30 Gy. No patients at the second dose level experienced dose-limiting toxicity. The most common Grade 2 toxicity was gastrointestinal, which was tolerable and manageable. Conclusions: The maximum tolerated dose of short-course radiotherapy was 30 Gy at 6 Gy per fraction. On the basis of this result, we are conducting a Phase II study with radiotherapy delivered at 30 Gy.« less
Developing Mathematical Content Knowledge for Teaching: One Preservice Teacher and Her Planning
ERIC Educational Resources Information Center
Wilson, Susanna
2016-01-01
This paper describes how a new pre-service teacher engaged with mathematical content in order to learn it for teaching, during practicum. The results show that the PST learned mathematical content by initiating and carrying out a preparation phase prior to planning. This phase involved searching through internet sites and making notes that were…
Implementation of a Web-Based Collaborative Process Planning System
NASA Astrophysics Data System (ADS)
Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi
Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.
Connected vehicle pilot deployment program phase 1, deployment outreach plan -- New York City.
DOT National Transportation Integrated Search
2016-07-19
This document is a high level plan that describes the Outreach Plan for the New York City Connected Vehicle Pilot Deployment. The plan defines the communications strategy for the CV Pilot Deployment; identifies roles and responsibilities of persons t...
Achieving Technological Literacy in Minnesota.
ERIC Educational Resources Information Center
Lindstrom, Mike
2002-01-01
Describes how Minnesota implemented the Standards for Technological Literacy: Content for the Study of Technology. Includes the timeline, rationale, potential activities and estimated costs associated with all phases, and steps for implementing the plan: investigate, replicate, integrate, and mandate. (JOW)
Congestion management system/IVHS program study Birmingham, Alabama : phase 1, report
DOT National Transportation Integrated Search
1995-04-01
The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...
Congestion Management System/IVHS Program Study for Birmingham, Alabama. Phase 1 Report
DOT National Transportation Integrated Search
1995-04-01
The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...
Design for effective development and prototyping of the HL-20
NASA Astrophysics Data System (ADS)
Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.
1993-10-01
A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.
Information technology and emergency management: preparedness and planning in US states.
Reddick, Christopher
2011-01-01
The purpose of this paper is to examine the impact of information technology (IT) on emergency preparedness and planning by analysing a survey of US state government departments of emergency management. The research results show that there has been a significant impact of IT on emergency planning. IT has proven to be effective for all phases of emergency management, but especially for the response phase. There are numerous technologies used in emergency management, ranging from the internet, Geographic Information Systems and wireless technologies to more advanced hazard analysis models. All were generally viewed as being effective. Lack of financial resources and support from elected officials is a perennial problem in public administration, and was found to be prevalent in this study of IT and emergency management. There was evidence that state governments rating high on a performance index were more likely to use IT for emergency management. © 2011 The Author(s). Disasters © Overseas Development Institute, 2011.
Haq, Rashida; Heus, Lineke; Baker, Natalie A; Dastur, Daisy; Leung, Fok-Han; Leung, Eman; Li, Benjamin; Vu, Kathy; Parsons, Janet A
2013-07-25
Following the completion of treatment and as they enter the follow-up phase, breast cancer patients (BCPs) often recount feeling 'lost in transition', and are left with many questions concerning how their ongoing care and monitoring for recurrence will be managed. Family physicians (FPs) also frequently report feeling ill-equipped to provide follow-up care to BCPs. In this three-phase qualitative pilot study we designed, implemented and evaluated a multi-faceted survivorship care plan (SCP) to address the information needs of BCPs at our facility and of their FPs. In Phase 1 focus groups and individual interviews were conducted with 35 participants from three stakeholder groups (BCPs, FPs and oncology specialist health care providers (OHCPs)), to identify specific information needs. An SCP was then designed based on these findings, consisting of both web-based and paper-based tools (Phase 2). For Phase 3, both sets of tools were subsequently evaluated via focus groups and interviews with 26 participants. Interviews and focus groups were audio taped, transcribed and content analysed for emergent themes and patterns. In Phase 1 patients commented that web-based, paper-based and human resources components were desirable in any SCP. Patients did not focus exclusively on the post-treatment period, but instead spoke of evolving needs throughout their cancer journey. FPs indicated that any tools to support them must distill important information in a user-friendly format. In Phase 2, a pilot SCP was subsequently designed, consisting of both web-based and paper-based materials tailored specifically to the needs of BCPs as well as FPs. During Phase 3 (evaluation) BCPs indicated that the SCP was effective at addressing many of their needs, and offered suggestions for future improvements. Both patients and FPs found the pilot SCP to be an improvement from the previous standard of care. Patients perceived the quality of the BCP-FP relationship as integral to their comfort with FPs assuming follow-up responsibilities. This pilot multi-component SCP shows promise in addressing the information needs of BCPs and the FPs who care for them. Next steps include refinement of the different SCP components, further evaluation (including usability testing), and planning for more extensive implementation.
Chloropicrin and 1,3-D Fumigant Management Plan Phase 2 Templates
Plans for soil fumigant pesticide products that contain chloropicrin or 1,3-dichloropropene should include application block information, tarp plan, sign posting for treated area and buffer zone, and other requirements.
Metam Sodium and Metam Potassium Fumigant Management Plan Phase 2 Templates
These templates provide a framework for structuring and reporting a plan for this type of pesticide product. Required data fields include application block size, buffer zone signage, soil conditions, and tarp plans.
Dazomet Fumigant Management Plan Phase 2 Templates
These templates provide a framework for reporting application block information, buffer zones, emergency response plan, tarp plan, soil conditions, air monitoring, and more for pesticide products containing the active ingredient dazomet, such as Basamid G.
ART/Ada design project, phase 1. Task 3 report: Test plan
NASA Technical Reports Server (NTRS)
Allen, Bradley P.
1988-01-01
The plan is described for the integrated testing and benchmark of Phase Ada based ESBT Design Research Project. The integration testing is divided into two phases: (1) the modules that do not rely on the Ada code generated by the Ada Generator are tested before the Ada Generator is implemented; and (2) all modules are integrated and tested with the Ada code generated by the Ada Generator. Its performance and size as well as its functionality is verified in this phase. The target platform is a DEC Ada compiler on VAX mini-computers and VAX stations running the VMS operating system.
A Sneak Preview of the E-ELT Design Reference Science Plan Questionnaire Results
NASA Astrophysics Data System (ADS)
Kissler-Patig, M.; Küpcü Yoldaş, A.; Liske, J.
2009-12-01
The European Extremely Large Telescope is in its detailed design phase until the end of 2010. During this period, the telescope design is being consolidated and instrument and operation concepts are being studied. The scientific users are feeding back requirements into the project in numerous ways. One of them, the Design Reference Science Plan, was an opportunity for the entire community to provide direct feedback to the project. Here, we summarise the first results from this study. The full report will appear in the first half of 2010.
National Highway Traffic Safety Administration FY 1995 Performance Plan
DOT National Transportation Integrated Search
1994-09-01
The NHTSA Fiscal Year 1995 performance plan for the Government Performance and Results Act of 1993 (GPRA) is the second in the three year pilot phase of the Act. This plan differs from the FY 1994 plan in two respects: 1) it uses a different "perform...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thrower, A.W.; Patric, J.; Keister, M.
2008-07-01
The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how thesemore » findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pan Xiaoning; Zhang Xiaodong; Li Yupeng
2009-02-01
Purpose: To study the impact of selecting different data sets from four-dimensional computed tomography (4D CT) imaging during proton treatment planning in patients with distal esophageal cancer. Methods and Materials: We examined the effects of changes in 4D CT data set and smearing margins in proton treatment planning for 5 patients with distal esophageal cancer whose diaphragms were in the beam path and could move several centimeters during respiration. Planning strategies based on (1) average, (2) inspiration, and (3) expiration CT were evaluated in terms of their coverage on the internal clinic target volume (ICTV) at the prescribed dose. Results:more » For Strategy 1, increasing the smearing margin caused an increase in the ICTV prescription dose coverage (PDC) at the end-exhalation phase for all patients, whereas the ICTV PDC decreased for some patients at the end-inhalation phase. For Strategy 2, a smearing margin in the range of 1.0 to 3.5 cm caused the ICTV PDC to remain essentially unchanged, regardless of which phase of 4D CT was used for dose calculation, for all patients. For Strategy 3, the ICTV coverage was adequate for 2 of the 5 patients when a smearing margin of less than 1.0 cm was used, but was not adequate for the other 3 patients regardless of the smearing margin. Conclusion: Using the inspiration CT plus a smearing margin can lead to adequate ICTV coverage in treatment plans for patients with distal esophageal tumors surrounded by tissue that is subject to large changes in density during a proton treatment.« less
European Healthy City Network Phase V: patterns emerging for healthy urban planning.
Grant, Marcus
2015-06-01
There is a tradition of planning cities and their infrastructure to successfully tackle communicable disease arising from urban development. Non-communicable disease follows a different course. Development brings in its wake a basket of adverse health and health equity outcomes that are proving difficult to tackle. In response, within Phase V of the European Healthy Cities Network, municipalities have implemented a range of policy and physical interventions using a settings approach. Owing to the time lag between physical interventions and health outcomes, this research interrogates city activity itself to develop better understanding. Self-reported city case studies and questionnaire data were analysed to reveal patterns using an inductive approach. Findings indicate that some categories of intervention, such as whole city planning and transport, have a systemic impact across the wider determinants of health. Addressing transferability and stakeholder understanding helped cities create conditions for successful outcomes. Cities had varying urban development approaches for tackling climate change. Improvements to current practice are discussed, including; a distinction between supply side and demand side in healthy urban planning; valuing co-benefits and developing integrative approaches to the evidence-base. This evaluative article is important for cities wanting to learn how to maximize benefits to public health through urban development and for researchers exploring, with a systemic approach, the experiences of European cities acting at the interface of urban development and public health. This article also provides recommendations for future phases of the WHO European Healthy Cities programme, posing questions to better address governance and equity in spatial planning. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Time management displays for shuttle countdown
NASA Technical Reports Server (NTRS)
Beller, Arthur E.; Hadaller, H. Greg; Ricci, Mark J.
1992-01-01
The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.
Munoz, F. D.; Hobbs, B. F.; Watson, J. -P.
2016-02-01
A novel two-phase bounding and decomposition approach to compute optimal and near-optimal solutions to large-scale mixed-integer investment planning problems is proposed and it considers a large number of operating subproblems, each of which is a convex optimization. Our motivating application is the planning of power transmission and generation in which policy constraints are designed to incentivize high amounts of intermittent generation in electric power systems. The bounding phase exploits Jensen’s inequality to define a lower bound, which we extend to stochastic programs that use expected-value constraints to enforce policy objectives. The decomposition phase, in which the bounds are tightened, improvesmore » upon the standard Benders’ algorithm by accelerating the convergence of the bounds. The lower bound is tightened by using a Jensen’s inequality-based approach to introduce an auxiliary lower bound into the Benders master problem. Upper bounds for both phases are computed using a sub-sampling approach executed on a parallel computer system. Numerical results show that only the bounding phase is necessary if loose optimality gaps are acceptable. But, the decomposition phase is required to attain optimality gaps. Moreover, use of both phases performs better, in terms of convergence speed, than attempting to solve the problem using just the bounding phase or regular Benders decomposition separately.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Munoz, F. D.; Hobbs, B. F.; Watson, J. -P.
A novel two-phase bounding and decomposition approach to compute optimal and near-optimal solutions to large-scale mixed-integer investment planning problems is proposed and it considers a large number of operating subproblems, each of which is a convex optimization. Our motivating application is the planning of power transmission and generation in which policy constraints are designed to incentivize high amounts of intermittent generation in electric power systems. The bounding phase exploits Jensen’s inequality to define a lower bound, which we extend to stochastic programs that use expected-value constraints to enforce policy objectives. The decomposition phase, in which the bounds are tightened, improvesmore » upon the standard Benders’ algorithm by accelerating the convergence of the bounds. The lower bound is tightened by using a Jensen’s inequality-based approach to introduce an auxiliary lower bound into the Benders master problem. Upper bounds for both phases are computed using a sub-sampling approach executed on a parallel computer system. Numerical results show that only the bounding phase is necessary if loose optimality gaps are acceptable. But, the decomposition phase is required to attain optimality gaps. Moreover, use of both phases performs better, in terms of convergence speed, than attempting to solve the problem using just the bounding phase or regular Benders decomposition separately.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Southworth, G.R.; Loar, J.M.; Ryon, M.G.
Ecological studies of the Bear Creek watershed, which drains the area surrounding several Oak Ridge Y-12 Plant waste disposal facilities, were initiated in May 1984 and are continuing at present. These studies consisted of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek, and they were followed by a presently ongoing monitoring phase that involves reduced sampling intensities. The characterization phase utilized two approaches: (1) instream sampling of benthic invertebrate and fish communities in Bear Creek to identify spatial and temporal patterns in distribution and abundance and (2) laboratory bioassays on water samples from Bearmore » Creek and selected tributaries to identify potential sources of toxicity to biota. The monitoring phase of the ecological program relates to the long-term goals of identifying and prioritizing contaminant sources and assessing the effectiveness of remedial actions. It continues activities of the characterization phase at less frequent intervals. The Bear Greek Valley is a watershed that drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in Bear Creek Valley resulted in contamination of Bear Creek and consequent ecological damage. Extensive remedial actions have been proposed at waste sites, and some of the have been implemented or are now underway. The proposed study plan consists of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek in the first year followed by a reduction in sampling intensity during the monitoring phase of the plan. The results of sampling conducted from May 1984 through early 1989 are presented in this report.« less
Leadership and management curriculum planning for Iranian general practitioners.
Khosravan, Shahla; Karimi Moonaghi, Hossein; Yazdani, Shahram; Ahmadi, Soleiman; Mansoorian, Mohammad Reza
2015-10-01
Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern's curriculum planning cycle. This study was conducted in 2011- 2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured interviews with key informants to capture their experiences and viewpoints about the necessity of management courses for undergraduate medical students, goals, objectives, and educational strategies according to Kern's curriculum planning cycle. The data was used to develop a questionnaire to be used in a quantitative written survey. Results of these two phases and that of the review of medical curriculum in other countries and management curriculum of other medical disciplines in Iran were used in management and leadership curriculum planning. In the qualitative phase, purposeful sampling and content analysis with constant comparison based on Strauss and Corbin's method were used; descriptive and analytic tests were used for quantitative data by SPSS version 14. In the qualitatively stage of this research, 6 main categories including the necessity of management course, features and objectives of management curriculum, proper educational setting, educational methods and strategies, evolutionary method and feedback result were determined. In the quantitatively stage of the research, from the viewpoints of 51.6% of 126 units of research who filled out the questionnaire, ranked high necessary of management courses. The coordination of care and clinical leadership was determined as the most important role for GPs with a mean of 6.2 from sample viewpoint. Also, team working and group dynamics had the first priority related to the principles and basics of management with a mean of 3.59. Other results were shown in the paper. Results of this study indicated the need to provide educational programs for GPs; it led to a systematic curriculum theory and clinical management using Kern cycle for general practitioner's discipline. Implementation and evaluation of this program is recommended.
Bowles, Kathryn H; Hanlon, Alexandra; Holland, Diane; Potashnik, Sheryl L; Topaz, Maxim
2014-01-01
Hospital clinicians are overwhelmed with the volume of patients churning through the health care systems. The study purpose was to determine whether alerting case managers about high-risk patients by supplying decision support results in better discharge plans as evidenced by time to first hospital readmission. Four medical units at one urban, university medical center. A quasi-experimental study including a usual care and experimental phase with hospitalized English-speaking patients aged 55 years and older. The intervention included using an evidence-based screening tool, the Discharge Decision Support System (D2S2), that supports clinicians' discharge referral decision making by identifying high-risk patients upon admission who need a referral for post-acute care. The usual care phase included collection of the D2S2 information, but not sharing the information with case managers. The experimental phase included data collection and then sharing the results with the case managers. The study compared time to readmission between index discharge date and 30 and 60 days in patients in both groups (usual care vs. experimental). After sharing the D2S2 results, the percentage of referral or high-risk patients readmitted by 30 and 60 days decreased by 6% and 9%, respectively, representing a 26% relative reduction in readmissions for both periods. Supplying decision support to identify high-risk patients recommended for postacute referral is associated with better discharge plans as evidenced by an increase in time to first hospital readmission. The tool supplies standardized information upon admission allowing more time to work with high-risk admissions.
Critical Thinking and the Use of Nontraditional Instructional Methodologies.
Orique, Sabrina B; McCarthy, Mary Ann
2015-08-01
The purpose of this study was to examine the relationship between critical thinking and the use of concept mapping (CM) and problem-based learning (PBL) during care plan development. A quasi-experimental study with a pretest-posttest design was conducted using a convenience sample (n = 49) of first-semester undergraduate baccalaureate nursing students. Critical thinking was measured using the Holistic Critical Thinking Scoring Rubric. Data analysis consisted of a repeated measures analysis of variance with post hoc mean comparison tests using the Bonferroni method. Findings indicated that mean critical thinking at phase 4 (CM and PBL) was significantly higher, compared with phase 1 (baseline), phase 2 (PBL), and phase 3 (CM [p < 0.001]). The results support the utilization of nontraditional instructional (CM and PBL) methodologies in undergraduate nursing curricula. Copyright 2015, SLACK Incorporated.
ERIC Educational Resources Information Center
Pennsylvania State Dept. of Environmental Resources, Harrisburg.
This document is Pennsylvania's master plan for environmental education (EE). It includes: (1) a list of planning principles and guidelines to enhance implementation of the master plan; (2) a flow chart illustrating feasibility, planning, action, and impact phases for the years 1983-85; (3) a summary of major recommendations; (4) a chart…
25 CFR 1001.9 - Selection criteria for tribes/consortia seeking advance planning grant funding.
Code of Federal Regulations, 2010 CFR
2010-04-01
... planning grant funding. 1001.9 Section 1001.9 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS... advance planning grant funding. (a) Who is eligible to apply for a planning grant that will be awarded...-governance tribe and needs advance funding in order to complete the planning phase requirement may apply...
ERIC Educational Resources Information Center
Superfine, Alison Castro
2008-01-01
Planning is an important phase of teaching, during which teachers make decisions about various aspects of instruction that ultimately shape students' opportunities to learn. Prior research on teacher planning, however, fails to adequately describe experienced teachers' planning decisions, and is unclear about the extent to which teachers use…
Long-Range Plan, Phase II: Implementation Plan, 1994-1999. Holyoke Community College.
ERIC Educational Resources Information Center
Holyoke Community Coll., MA.
The Long-Range Planning Committee at Holyoke Community College (HCC) in Massachusetts has devised a 5-year plan to help the college focus on its most important priorities as it seeks to grow and accommodate change. This planning document identifies seven major institutional goals, objectives comprised by each goal, long-range strategies to achieve…
2012-04-11
labor . The first phase is primarily focused at the community level with education, training, and developing skills. Phase two is a transition to...incorporates design into the framework as the project is identified and reinserted several times in the process, to include toward the end of
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R4-FHC-2012-N030; FVHC98130406900Y4-XXX-FF04G01000] Correction Notice for Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and Environmental Assessment AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability and request...
ERIC Educational Resources Information Center
Employment and Training Administration (DOL), Washington, DC. Office of Work-Based Learning.
In preparing Phase I of the Strategic Plan, the Federal Committee on Apprenticeship noted that efforts beyond education and technical assistance may be needed to develop apprenticeship fully in the United States. Specifically, the committee would examine and make recommendations with respect to such issues as incentives for participation,…
The purpose of this SOP is to describe the training sequence for incoming student data assistants (students). The procedure is designed to provide them with an overview of the study in terms of study goals, structure and project data needs. This overview familiarizes the studen...
NASA Technical Reports Server (NTRS)
Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.; Zuzek, John E.
1987-01-01
Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.
Masser, Barbara M; White, Katherine M; Hamilton, Kyra; McKimmie, Blake M
2012-02-01
Using a Theory of Planned Behavior (TPB) framework the current study explored the beliefs of current blood donors (N=172) about donating during a low and high-risk phase of a potential avian influenza outbreak. While the majority of behavioral, normative, and control beliefs identified in preliminary research differed as a function of donors' intentions to donate during both phases of an avian influenza outbreak, regression analyses suggested that the targeting of different specific beliefs during each phase of an outbreak would yield most benefit in bolstering donors' intentions to remain donating. The findings provide insight in how to best motivate donors in different phases of an avian influenza outbreak. Copyright © 2011 Elsevier Ltd. All rights reserved.
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
Contracting out : benchmarking study : phase 1 : part 2 : external data collection
DOT National Transportation Integrated Search
2002-04-17
The planning provisions of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the transportation provisions of the Clean Air Act Amendments of 1990 (CAAA) define the framework for the effective integration of transportation and ...
Phase 1 AGTC survey : data collected .
DOT National Transportation Integrated Search
1972-05-01
As part of a nationwide airport ground traffic control requirements study, a survey of nine airports has been made to gather data. At each airport, pre-planned interviews were conducted with the airport management and with FAA control tower personnel...
ERIC Educational Resources Information Center
Hayden, Mary; And Others
As a result of a study in 1972, in which independent college administrators were asked to assess their growth needs and problems, the Northwest Area Foundation established the Independent College Program to assist colleges in dealing with their needs. The first phase, the Admissions and Retention Program, was designed to assist colleges in coping…
Variable speed gas engine-driven air compressor system
NASA Astrophysics Data System (ADS)
Morgan, J. R.; Ruggles, A. E.; Chen, T. N.; Gehret, J.
1992-11-01
Tecogen Inc. and Ingersoll-Rand Co. as a subcontractor have designed a nominal 150-hp gas engine-driven air compressor utilizing the TECODRIVE 8000 engine and the Ingersoll-Rand 178.5-mm twin screw compressor. Phase 1 included the system engineering and design, economic and applications studies, and a draft commercialization plan. Phase 2 included controls development, laboratory prototype construction, and performance testing. The testing conducted verified that the compressor meets all design specifications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
May, Bruce; Michael, Gary; Wachsmuth, John
1988-06-01
The Hungry Horse Reservoir study is part of the Northwest Power Planning Council's resident fish and wildlife plan. The plan is responsible for mitigating damages to the fish and wildlife resources caused by hydroelectric development in the Columbia River Basin. The major goal of our study is to quantify seasonal water levels needed to maintain or enhance the reservoir fishery. This study began in May, 1983, and the initial phase will be completed July, 1988. This report summarizes limnological, fish abundance, fish distribution and fish food habits data collected from 1983 to 1988. The effect of reservoir operation upon fishmore » habitat, fish food organisms and fish growth is discussed. 71 refs., 36 figs., 46 tabs.« less
Architectural Drafting, Drafting 2: 9255.04.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
The course covers the basic fundamentals of architectural drafting and is not intended to delve into the more advanced phases of architecture. The student is presented with standards and procedures, and will become proficient in layout of floor plans, electrical plans, roof construction, foundation plans, typical wall construction, plot plans, and…
A Planning Guide for Instructional Networks, Part I.
ERIC Educational Resources Information Center
Daly, Kevin F.
1994-01-01
Discusses three phases in implementing a master plan for a school-based local area network (LAN): (1) network software selection; (2) hardware selection, network topology, and site preparation; and (3) implementation time table. Sample planning and specification worksheets and a list of planning guides are included. (Contains six references.) (KRN)
43 CFR 11.81 - Damage determination phase-restoration and compensation determination plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... compensation determination plan. 11.81 Section 11.81 Public Lands: Interior Office of the Secretary of the...—restoration and compensation determination plan. (a) Requirement. (1) The authorized official shall develop a Restoration and Compensation Determination Plan that will list a reasonable number of possible alternatives...
43 CFR 11.81 - Damage determination phase-restoration and compensation determination plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... compensation determination plan. 11.81 Section 11.81 Public Lands: Interior Office of the Secretary of the...—restoration and compensation determination plan. (a) Requirement. (1) The authorized official shall develop a Restoration and Compensation Determination Plan that will list a reasonable number of possible alternatives...
A Guide to Program Planning Vol. II.
ERIC Educational Resources Information Center
Allen, Earl, Sr.
This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…
Spiegel, M A; Koester, D; Weigelt, M; Schack, T
2012-02-16
How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
Designing a model for trauma system management using public health approach: the case of Iran.
Tarighi, Payam; Tabibi, Seyed Jamaledin; Motevalian, Seyed Abbas; Tofighi, Shahram; Maleki, Mohammad Reza; Delgoshaei, Bahram; Panahi, Farzad; Masoomi, Gholam Reza
2012-01-01
Trauma is a leading cause of death and disability around the world. Injuries are responsible for about six million deaths annually, of which ninety percent occur in developing countries. In Iran, injuries are the most common cause of death among age groups below fifty. Trauma system development is a systematic and comprehensive approach to injury prevention and treatment whose effectiveness has been proved. The present study aims at designing a trauma system management model as the first step toward trauma system establishment in Iran. In this qualitative research, a conceptual framework was developed based on the public health approach and three well-known trauma system models. We used Benchmarks, Indicators and Scoring (BIS) to analyze the current situation of Iran trauma care system. Then the trauma system management was designed using the policy development phase of public health approach The trauma system management model, validated by a panel of experts, describes lead agency, trauma system plan, policy-making councils, and data-based control according to the four main functions of management: leading, planning, organizing and controlling. This model may be implemented in two phases: the exclusive phase, focusing on resource integration and the inclusive phase, which concentrates on system development. The model could facilitate the development of trauma system in Iran through pilot studies as the assurance phase of public health approach. Furthermore, the model can provide a practical framework for trauma system management at the international level.
A Field Study Program in Analytical Chemistry for College Seniors.
ERIC Educational Resources Information Center
Langhus, D. L.; Flinchbaugh, D. A.
1986-01-01
Describes an elective field study program at Moravian College (Pennsylvania) in which seniors in analytical chemistry obtain first-hand experience at Bethlehem Steel Corporation. Discusses the program's planning phase, some method development projects done by students, experiences received in laboratory operations, and the evaluation of student…
NHEXAS PHASE I ARIZONA STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (QSIP).
The Arizona Consortium scoping studies were designed to be part of the total NHEXAS framework that was developed as a result of a series scientific discussions and workshops conducted by the US EPA from 1992 through 1993. Several scientific issues needed to be addressed to evalua...
Norouzi, Saiideh; Moghaddam, Mohammad Hossein Baghiani; Morowatisharifabad, Mohammad Ali; Norouzi, Ali; Jafari, Ali Reza; Fallahzadeh, Hossein
2015-01-01
Context: Identification of parenting skills determinants among mothers is an ongoing field of research. Aims: The aim of this study was to identify the social cognitive predictors of parenting skills among mothers. Settings and Design: Previous studies have demonstrated the health action process approach (HAPA) as a credible frame for predicting behavior, but the number of studies considering the predictive value of parenting skills determinants among mothers is rare. Subjects and Methods: An 8 months prospective design was applied. Participants were mothers with preschool and early elementary school-aged children. At the 1st time, 120 participants completed self-report questionnaires regarding their risk perception, outcome expectancies, task self-efficacy, and intentions toward parenting skills. At the 2nd time, they returned a follow-up questionnaire, which measured planning, coping self-efficacy, and recovery self-efficacy and finally, 8 months later as the 3rd time, parenting skills were measured. Path analysis was used for analysis. Results: Path analysis indicated that, in the motivational phase, there was no relationship between parenting skills intention and risk perception, outcome expectancies, and task self-efficacy. Furthermore, no relationship was found between parenting skills intention and planning. In the volitional phase, coping self-efficacy, recovery self-efficacy, and planning were statistically significant predictors of parenting skills. Conclusion: The results of this study confirm that volitional phase of the HAPA model is useful in determining parenting skills. However, the role motivational variables seem to be unimportant in performing these behaviors. It was concluded that everybody intended to apply parenting skills, in nature, and intervention strategies should be focused on turning intentions into behavior. PMID:27462638
[Application analysis of Nursing Care Systematization according to Horta's Conceptual Model].
da Cunha, Sandra Maria Botelho; Barros, Alba Lúcia Botura Leite
2005-01-01
This study has as purpose to analyse the implementation of the Nursing Care Systematization in a private hospital in medical surgical units. Results evidenced that the Horta's Conceptual Model was present only in part of nursing hystory instrument, that the remaining phases of nursing process were not inter-related and that there was a lack of coherence of the prescribed actions in relation to the patient's health condition. From the results of the study it can be concluded that the model used for Nursing Care Systematization is eclectic, not obeying therefore, only to Horta's conceptual model; the totality of the data had not been collected in some phases of the nursing process; there is no correlation of the phases in the majority of analyzed patient records; diagnostic and planning phases do not comprise the phases of the nursing process as proposed by Horta.
Pandya, Samta P
2018-05-05
This article is based on a longitudinal study of Indian Americans devoted to a guru tradition, aiming to explore how faith contributes to their mental well-being. Respondent sample size at phase 1 (2003-2004) was 1872 and at phase 2 (2013-2014) was 1764. Two scales were used to measure faith maturity and well-being. Results showed that phase 2 well-being scores of the devotees were higher, influenced by faith maturity and engagement regularity, thereby corroborating the faith-religiosity-well-being link, further reinforced by the structural equation model. Faith emerges as critical variable in working with this cohort and planning interventions towards promoting their well-being.
Development of biology student worksheets to facilitate science process skills of student
NASA Astrophysics Data System (ADS)
Rahayu, Y. S.; Pratiwi, R.; Indana, S.
2018-01-01
This research aims to describe development of Biology student worksheets to facilitate science process skills of student, at the same time to facilitate thinking skills of students in senior high school are equipped with Assesment Sheets. The worksheets development refers to cycle which includes phase analysis (analysis), planning (planning), design (design), development (development), implementation (implementation), evaluation and revision (evaluation and revision). Phase evaluation and revision is an ongoing activity conducted in each phase of the development cycle. That is, after the evaluation of the results of these activities and make revisions at any phase, then continue to the next phase. Based on the test results for grade X, XI, and XII in St. Agnes Surabaya high school, obtained some important findings. The findings are as follows. (1) Developed biology student worksheets could be used to facilitate thinking ability of students in particular skills integrated process that includes components to formulate the problem, formulate hypotheses, determine the study variables, formulate an operational definition of variables, determine the steps in the research, planning data tables, organizing Data in the form of tables/charts, drawing conclusions, (2) Developed biology student worksheets could also facilitate the development of social interaction of students such as working together, listening/respect the opinions of others, assembling equipment and materials, discuss and share information and facilitate the upgrading of skills hands-on student activity. (3) Developed biology worksheets basically could be implemented with the guidance of the teacher step by step, especially for students who have never used a similar worksheet. Guidance at the beginning of this need, especially for worksheets that require special skills or understanding of specific concepts as a prerequisite, such as using a microscope, determine the heart rate, understand the mechanism of specific indicators.
Frontiers in planning optimization for lung SBRT.
Giglioli, Francesca Romana; Clemente, Stefania; Esposito, Marco; Fiandra, Christian; Marino, Carmelo; Russo, Serenella; Strigari, Lidia; Villaggi, Elena; Stasi, Michele; Mancosu, Pietro
2017-12-01
Emerging data are showing the safety and the efficacy of Stereotactic Body Radiation therapy (SBRT) in lung cancer management. In this context, the very high doses delivered to the Planning Target Volume, make the planning phase essential for achieving high dose levels conformed to the shape of the target in order to have a good prognosis for tumor control and to avoid an overdose in relevant healthy adjacent tissue. In this non-systematic review we analyzed the technological and the physics aspects of SBRT planning for lung cancer. In particular, the aims of the study were: (i) to evaluate prescription strategies (homogeneous or inhomogeneous), (ii) to outline possible geometrical solutions by comparing the dosimetric results (iii) to describe the technological possibilities for a safe and effective treatment, (iv) to present the issues concerning radiobiological planning and the automation of the planning process. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Diller, Christian; Karic, Sarah; Oberding, Sarah
2017-06-01
The topic of this article ist the question, in which phases oft he political planning process planners apply their methodological set of tools. That for the results of a research-project are presented, which were gained by an examination of planning-cases in learned journals. Firstly it is argued, which model oft he planning-process is most suitable to reflect the regarded cases and how it is positioned to models oft he political process. Thereafter it is analyzed, which types of planning methods are applied in the several stages oft he planning process. The central findings: Although complex, many planning processes can be thouroughly pictured by a linear modell with predominantly simple feedback loops. Even in times of he communicative turn, concerning their set of tools, planners should pay attention to apply not only communicative methods but as well the classical analytical-rational methods. They are helpful especially for the understanding of the political process before and after the actual planning phase.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, Wei, E-mail: Liu.Wei@mayo.edu; Schild, Steven E.; Chang, Joe Y.
Purpose: The purpose of this study was to compare the impact of uncertainties and interplay on 3-dimensional (3D) and 4D robustly optimized intensity modulated proton therapy (IMPT) plans for lung cancer in an exploratory methodology study. Methods and Materials: IMPT plans were created for 11 nonrandomly selected non-small cell lung cancer (NSCLC) cases: 3D robustly optimized plans on average CTs with internal gross tumor volume density overridden to irradiate internal target volume, and 4D robustly optimized plans on 4D computed tomography (CT) to irradiate clinical target volume (CTV). Regular fractionation (66 Gy [relative biological effectiveness; RBE] in 33 fractions) was considered.more » In 4D optimization, the CTV of individual phases received nonuniform doses to achieve a uniform cumulative dose. The root-mean-square dose-volume histograms (RVH) measured the sensitivity of the dose to uncertainties, and the areas under the RVH curve (AUCs) were used to evaluate plan robustness. Dose evaluation software modeled time-dependent spot delivery to incorporate interplay effect with randomized starting phases of each field per fraction. Dose-volume histogram (DVH) indices comparing CTV coverage, homogeneity, and normal tissue sparing were evaluated using Wilcoxon signed rank test. Results: 4D robust optimization plans led to smaller AUC for CTV (14.26 vs 18.61, respectively; P=.001), better CTV coverage (Gy [RBE]) (D{sub 95%} CTV: 60.6 vs 55.2, respectively; P=.001), and better CTV homogeneity (D{sub 5%}-D{sub 95%} CTV: 10.3 vs 17.7, resspectively; P=.002) in the face of uncertainties. With interplay effect considered, 4D robust optimization produced plans with better target coverage (D{sub 95%} CTV: 64.5 vs 63.8, respectively; P=.0068), comparable target homogeneity, and comparable normal tissue protection. The benefits from 4D robust optimization were most obvious for the 2 typical stage III lung cancer patients. Conclusions: Our exploratory methodology study showed that, compared to 3D robust optimization, 4D robust optimization produced significantly more robust and interplay-effect-resistant plans for targets with comparable dose distributions for normal tissues. A further study with a larger and more realistic patient population is warranted to generalize the conclusions.« less
Effects of offshore wind farms on marine wildlife—a generalized impact assessment
NASA Astrophysics Data System (ADS)
Bergström, Lena; Kautsky, Lena; Malm, Torleif; Rosenberg, Rutger; Wahlberg, Magnus; Åstrand Capetillo, Nastassja; Wilhelmsson, Dan
2014-03-01
Marine management plans over the world express high expectations to the development of offshore wind energy. This would obviously contribute to renewable energy production, but potential conflicts with other usages of the marine landscape, as well as conservation interests, are evident. The present study synthesizes the current state of understanding on the effects of offshore wind farms on marine wildlife, in order to identify general versus local conclusions in published studies. The results were translated into a generalized impact assessment for coastal waters in Sweden, which covers a range of salinity conditions from marine to nearly fresh waters. Hence, the conclusions are potentially applicable to marine planning situations in various aquatic ecosystems. The assessment considered impact with respect to temporal and spatial extent of the pressure, effect within each ecosystem component, and level of certainty. Research on the environmental effects of offshore wind farms has gone through a rapid maturation and learning process, with the bulk of knowledge being developed within the past ten years. The studies showed a high level of consensus with respect to the construction phase, indicating that potential impacts on marine life should be carefully considered in marine spatial planning. Potential impacts during the operational phase were more locally variable, and could be either negative or positive depending on biological conditions as well as prevailing management goals. There was paucity in studies on cumulative impacts and long-term effects on the food web, as well as on combined effects with other human activities, such as the fisheries. These aspects remain key open issues for a sustainable marine spatial planning.
Crew interface definition study, phase 1
NASA Technical Reports Server (NTRS)
Callihan, J. C.; Kraemer, J. W.; Alles, J. A.
1971-01-01
The timeline analysis of the Shuttle orbiter missions which was conducted in the Phase I Crew Interface Definition Study and the requirements for the man-in-the-loop simulation study are presented. Mission definitions and objectives are presented as they relate to various Shuttle Orbiter missions. The requirements for crew participation and the information required by the crew are discussed, and finally the rationale behind the display concept and calling procedures is given. The simulation objectives, the simulation mechanization, including a detailed presentation of the display and control concept, the simulator test plan and the results are discussed.
Software verification plan for GCS. [guidance and control software
NASA Technical Reports Server (NTRS)
Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.
1990-01-01
This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.
48 CFR 52.237-3 - Continuity of Services.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the Government or another contractor, may continue them. The Contractor agrees to (1) furnish phase-in... phase-in, phase-out services for up to 90 days after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services...
48 CFR 52.237-3 - Continuity of Services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the Government or another contractor, may continue them. The Contractor agrees to (1) furnish phase-in... phase-in, phase-out services for up to 90 days after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services...
Overlap of movement planning and movement execution reduces reaction time.
Orban de Xivry, Jean-Jacques; Legrain, Valéry; Lefèvre, Philippe
2017-01-01
Motor planning is the process of preparing the appropriate motor commands in order to achieve a goal. This process has largely been thought to occur before movement onset and traditionally has been associated with reaction time. However, in a virtual line bisection task we observed an overlap between movement planning and execution. In this task performed with a robotic manipulandum, we observed that participants (n = 30) made straight movements when the line was in front of them (near target) but often made curved movements when the same target was moved sideways (far target, which had the same orientation) in such a way that they crossed the line perpendicular to its orientation. Unexpectedly, movements to the far targets had shorter reaction times than movements to the near targets (mean difference: 32 ms, SE: 5 ms, max: 104 ms). In addition, the curvature of the movement modulated reaction time. A larger increase in movement curvature from the near to the far target was associated with a larger reduction in reaction time. These highly curved movements started with a transport phase during which accuracy demands were not taken into account. We conclude that an accuracy demand imposes a reaction time penalty if processed before movement onset. This penalty is reduced if the start of the movement consists of a transport phase and if the movement plan can be refined with respect to accuracy demands later in the movement, hence demonstrating an overlap between movement planning and execution. In the planning of a movement, the brain has the opportunity to delay the incorporation of accuracy requirements of the motor plan in order to reduce the reaction time by up to 100 ms (average: 32 ms). Such shortening of reaction time is observed here when the first phase of the movement consists of a transport phase. This forces us to reconsider the hypothesis that motor plans are fully defined before movement onset. Copyright © 2017 the American Physiological Society.
Overlap of movement planning and movement execution reduces reaction time
Legrain, Valéry; Lefèvre, Philippe
2016-01-01
Motor planning is the process of preparing the appropriate motor commands in order to achieve a goal. This process has largely been thought to occur before movement onset and traditionally has been associated with reaction time. However, in a virtual line bisection task we observed an overlap between movement planning and execution. In this task performed with a robotic manipulandum, we observed that participants (n = 30) made straight movements when the line was in front of them (near target) but often made curved movements when the same target was moved sideways (far target, which had the same orientation) in such a way that they crossed the line perpendicular to its orientation. Unexpectedly, movements to the far targets had shorter reaction times than movements to the near targets (mean difference: 32 ms, SE: 5 ms, max: 104 ms). In addition, the curvature of the movement modulated reaction time. A larger increase in movement curvature from the near to the far target was associated with a larger reduction in reaction time. These highly curved movements started with a transport phase during which accuracy demands were not taken into account. We conclude that an accuracy demand imposes a reaction time penalty if processed before movement onset. This penalty is reduced if the start of the movement consists of a transport phase and if the movement plan can be refined with respect to accuracy demands later in the movement, hence demonstrating an overlap between movement planning and execution. NEW & NOTEWORTHY In the planning of a movement, the brain has the opportunity to delay the incorporation of accuracy requirements of the motor plan in order to reduce the reaction time by up to 100 ms (average: 32 ms). Such shortening of reaction time is observed here when the first phase of the movement consists of a transport phase. This forces us to reconsider the hypothesis that motor plans are fully defined before movement onset. PMID:27733598
Phase 2 Clinical Trial of AC105 (Mg/PEG) for Treatment of Acute Spinal Cord Injury (SCI)
2015-12-01
initiation of 10 centers in the first 6 months, and an additional 10 centers over the next 6 months, the subject recruitment phase would have...Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 FDA Approval, Planning & Rolling Initiation of Sites Active phase of study: 6 & 12 month follow-ups Data...analysis Reports The Proposed Milestones for the project were: 1. Month 3 – FDA approval of clinical protocol 2. Month 6 – First site initiation and IRB
The European ELT: status report
NASA Astrophysics Data System (ADS)
Cuby, J.-G.
2010-12-01
This paper provides a brief status report on the European Extremely Large Telescope (E-ELT) as presented at the annual meeting of the French Astronomical Society (SF2A) held in Marseille in June 2010. The project is now proceeding to the end of its Phase B that lasted four years, the results of which will form the basis of the proposal for construction that will be submitted to the ESO council for approval. The decision is expected to be taken in 2011. In parallel to the Telescope Phase B, Instrument Phase A studies have been completed from which a comprehensive instrumentation plan could be drawn.
Using a visual plate waste study to monitor menu performance.
Connors, Priscilla L; Rozell, Sarah B
2004-01-01
Two visual plate waste studies were conducted in 1-week phases over a 1-year period in an acute care hospital. A total of 383 trays were evaluated in the first phase and 467 in the second. Food items were ranked for consumption from a low (1) to high (6) score, with a score of 4.0 set as the benchmark denoting a minimum level of acceptable consumption. In the first phase two entrees, four starches, all of the vegetables, sliced white bread, and skim milk scored below the benchmark. As a result six menu items were replaced and one was modified. In the second phase all entrees scored at or above 4.0, as did seven vegetables, and a dinner roll that replaced sliced white bread. Skim milk continued to score below the benchmark. A visual plate waste study assists in benchmarking performance, planning menu changes, and assessing effectiveness.
OSD CALS Architecture Master Plan Study. Concept Paper. Security. Volume 38
DOT National Transportation Integrated Search
1989-07-01
Developing and executing a well-thought-out security policy is critical to the success of CALS. Without appropriate security measures, the integration of technology, organizations, functions, and data envisioned as Phase II CALS can not occur. Theref...
CMIF ECLS system test findings
NASA Technical Reports Server (NTRS)
Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.
1989-01-01
During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.
An Overview of the Jupiter Europa Orbiter Concept's Europa Science Phase Orbit Design
NASA Technical Reports Server (NTRS)
Lock, Robert E.; Ludwinski, Jan M.; Petropoulos, Anastassios E.; Clark, Karla B.; Pappalardo, Robert T.
2009-01-01
Jupiter Europa Orbiter (JEO), the proposed NASA element of the proposed joint NASA-ESA Europa Jupiter System Mission (EJSM), could launch in February 2020 and conceivably arrive at Jupiter in December of 2025. The concept is to perform a multi-year study of Europa and the Jupiter system, including 30 months of Jupiter system science and a comprehensive Europa orbit phase of 9 months. This paper provides an overview of the JEO concept and describes the Europa Science phase orbit design and the related science priorities, model pay-load and operations scenarios needed to conduct the Europa Science phase. This overview is for planning and discussion purposes only.
ART/Ada design project, phase 1: Project plan
NASA Technical Reports Server (NTRS)
Allen, Bradley P.
1988-01-01
The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.
Design Recovery for Software Library Population
1992-12-01
increase understandability, efficiency, and maintainability of the software and the design. A good representation choice will also aid in...required for a reengineering project. It details the analysis and planning phase and gives good criteria for determining the need for a reengineering...because it deals with all of these issues. With his complete description of the analysis and planning phase, Byrne has a good foundation for
Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report
1990-04-05
MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a
Using a Theory of Action to Develop Performance Indicators to Measure Progress toward a SIMR
ERIC Educational Resources Information Center
Schiller, Ellen; Hayes, Susan; Nagle, Katherine
2015-01-01
This white paper offers an approach for using a theory of action as an outline to develop the SSIP [State Systemic Improvement Plan] Phase II evaluation questions and plan that will guide the SSIP work in Phase III and beyond. Key areas of focus include generating evaluation questions at each level of outcomes, identifying essential steps and…
ERIC Educational Resources Information Center
Young, Derrick P.
Designed for use with interested students at high schools, community colleges, and four-year colleges, this lesson plan was developed to provide an introduction to the pre-hospital phase of Emergency Medical Services (EMS) and to serve as a recruitment tool for the EMS Program at Kapiolani Community College (KCC) in Hawaii. The objectives of the…
Managing aggression in a psychiatric hospital using a behaviour plan: a case study.
Bisconer, S W; Green, M; Mallon-Czajka, J; Johnson, J S
2006-10-01
This paper focuses on the critical role of nursing in implementing a behaviour plan in a psychiatric hospital. The plan was implemented with a 40-year-old man with a long history of aggression towards others and self. The study used a single-subject research design with baseline and intervention phases (AB Design). Data were collected on (1) frequency of incidents of aggression towards others and self; (2) use of restrictive interventions to manage aggression (i.e. restraints, pro re nata medication, 1:1 special observation); and (3) frequency of staff injury. The data show a decrease in frequency of aggression towards others and self, a concurrent reduction in the use of restrictive interventions to manage aggression, and a decrease in incidents of staff injury. The behaviour plan helped staff maintain a safe and therapeutic milieu. The behaviour plan has given the patient an opportunity to learn positive replacement behaviours and skills, and the opportunity eventually to leave the hospital to live in a less restrictive community home.
Norrman, Jenny; Volchko, Yevheniya; Hooimeijer, Fransje; Maring, Linda; Kain, Jaan-Henrik; Bardos, Paul; Broekx, Steven; Beames, Alistair; Rosén, Lars
2016-09-01
This paper presents a holistic approach to sustainable urban brownfield redevelopment where specific focus is put on the integration of a multitude of subsurface qualities in the early phases of the urban redevelopment process, i.e. in the initiative and plan phases. Achieving sustainability in brownfield redevelopment projects may be constrained by a failure of engagement between two key expert constituencies: urban planners/designers and subsurface engineers, leading to missed opportunities and unintended outcomes in the plan realisation phase. A more integrated approach delivers greater benefits. Three case studies in the Netherlands, Belgium and Sweden were used to test different sustainability assessment instruments in terms of the possibility for knowledge exchange between the subsurface and the surface sectors and in terms of cooperative learning among experts and stakeholders. Based on the lessons learned from the case studies, a generic decision process framework is suggested that supports holistic decision making. The suggested framework focuses on stakeholder involvement, communication, knowledge exchange and learning and provides an inventory of instruments that can support these processes. Copyright © 2016 Elsevier B.V. All rights reserved.
Bekemeier, Betty; Riley, Catharine M; Padgett, Stephen M; Berkowitz, Bobbie
2007-01-01
Leveraging funds to sustain the efforts of a grant-funded initiative is often an explicit, or implicit, expectation in philanthropy. However, the magnitude of funds leveraged and the factors that facilitate success in leveraging are rarely researched. An example of one of these grant-funded initiatives is the National Turning Point Initiative. Twenty-one states received funding from The Robert Wood Johnson Foundation as part of this initiative to establish and implement strategic goals for achieving significant statewide public health system improvement through diverse, cross-sector partnerships. Leaders from 17 of these 21 states participated in a two-phased study regarding the leveraging of additional funds for their public health infrastructure improvement activities. This article reports on the second phase of the study. In this phase, key informant interviews were conducted to examine how leveraging of resources occurred as part of this large national initiative. Findings indicate that the combination of a comprehensive planning process and a broad-based partnership was crucial in securing resources to expand their efforts. The ability to strategically respond to unexpected events and opportunities also helped states use their plans and partnerships to "make the case" for additional resources to improve their public health infrastructure.
Final Work Plan: Targeted Investigation at York, Nebraska
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less
Robust optimization methods for cardiac sparing in tangential breast IMRT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mahmoudzadeh, Houra, E-mail: houra@mie.utoronto.ca; Lee, Jenny; Chan, Timothy C. Y.
Purpose: In left-sided tangential breast intensity modulated radiation therapy (IMRT), the heart may enter the radiation field and receive excessive radiation while the patient is breathing. The patient’s breathing pattern is often irregular and unpredictable. We verify the clinical applicability of a heart-sparing robust optimization approach for breast IMRT. We compare robust optimized plans with clinical plans at free-breathing and clinical plans at deep inspiration breath-hold (DIBH) using active breathing control (ABC). Methods: Eight patients were included in the study with each patient simulated using 4D-CT. The 4D-CT image acquisition generated ten breathing phase datasets. An average scan was constructedmore » using all the phase datasets. Two of the eight patients were also imaged at breath-hold using ABC. The 4D-CT datasets were used to calculate the accumulated dose for robust optimized and clinical plans based on deformable registration. We generated a set of simulated breathing probability mass functions, which represent the fraction of time patients spend in different breathing phases. The robust optimization method was applied to each patient using a set of dose-influence matrices extracted from the 4D-CT data and a model of the breathing motion uncertainty. The goal of the optimization models was to minimize the dose to the heart while ensuring dose constraints on the target were achieved under breathing motion uncertainty. Results: Robust optimized plans were improved or equivalent to the clinical plans in terms of heart sparing for all patients studied. The robust method reduced the accumulated heart dose (D10cc) by up to 801 cGy compared to the clinical method while also improving the coverage of the accumulated whole breast target volume. On average, the robust method reduced the heart dose (D10cc) by 364 cGy and improved the optBreast dose (D99%) by 477 cGy. In addition, the robust method had smaller deviations from the planned dose to the accumulated dose. The deviation of the accumulated dose from the planned dose for the optBreast (D99%) was 12 cGy for robust versus 445 cGy for clinical. The deviation for the heart (D10cc) was 41 cGy for robust and 320 cGy for clinical. Conclusions: The robust optimization approach can reduce heart dose compared to the clinical method at free-breathing and can potentially reduce the need for breath-hold techniques.« less
NASA Astrophysics Data System (ADS)
Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa
2013-04-01
The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored by means of exploratory questionnaires and interviews with government agencies, local administrations, community and research organizations on each study site. First results provided will address the general role of spatial planning in risk management. Additionally, preliminary observations are made in regard to the coordination of emergency preparedness and long-term spatial planning activities. The observations consider that integration facilitates proactive strategies that aim at preventing disaster occurrence and promote interaction between involved parties. Finally, consideration is given to the potential use of a DSS tool to cover both aspects of spatial planning and emergency management in the risk management cycle.
NEAs: Phase Angle Dependence of Asteroid Class and Diameter from Observational Studies
NASA Astrophysics Data System (ADS)
Wooden, Diane H.; Lederer, Susan M.; Bus, Schelte; Tokunaga, Alan; Jehin, Emmanuel; Howell, Ellen S.; Nolan, Michael C.; Ryan, Erin; Fernandez, Yan; Harker, David; Reddy, Vishnu; Benner, Lance AM; Lovell, Amy; Moskovitz, Nicholas; Kerr, Tom; Woodward, Charles
2015-08-01
We will discuss the results of a planned observation campaign of Near Earth Asteroids (NEAs), 1999 CU3, 2002 GM2, 2002 FG7, and 3691 Bede with instruments on the United Kingdom Infrared Telescope (UKIRT) from 15-Mar-2015 to 28-April 2015 UT. We will study the phase-angle dependence of the reflectance and thermal emission spectra. Recent publications reveal that the assignment of the asteroid class from visible and near-IR spectroscopy can change with phase angle for NEAs with silicate-bearing minerals on their surfaces (S-class asteroids) (Thomas et al. 2014, Icarus 228, 217; Sanchez et al. 2012 Icarus 220, 36). Only three of the larger NEAs have been measured at a dozen phase angles and the trends are not all the same, so there is not yet enough information to create a phase-angle correction. Also, the phase angle effect is not characterized well for the thermal emission including determination of the albedo and the thermal emission. The few NEAs were selected for our study amongst many possible targets based on being able to observe them through a wide range of phase angles, ranging from less than about 10 degrees to greater than 45 degrees over the constrained date range. The orbits of NEAs often generate short observing windows at phase angles higher than 45 deg (i.e., whizzing by Earth and/or close to dawn or dusk). Ultimately, lowering the uncertainty of the translation of asteroid class to meteorite analog and of albedo and size determinations are amongst our science goals. On a few specific nights, we plan to observe the 0.75-2.5 micron spectra with IRTF+SpeX for comparison with UKIRT data including 5-20 micron with UKIRT+UIST/Michelle to determine as best as possible the albedos. To ensure correct phasing of spectroscopic data, we augment with TRAPPIST-telescope light curves and R-band guider image data. Our observations will contribute to understanding single epoch mid-IR and near-IR measurements to obtain albedo, size and IR beaming parameters (the outcomes of thermal models) and asteroid spectral class.
NEAs: Phase Angle Dependence of Asteroid Class and Diameter from Observational Studies
NASA Technical Reports Server (NTRS)
Wooden, Diane H.; Lederer, Susan M.; Bus, Schlete; Tokunaga, Alan; Jehin, Emmanuel; Howell, Ellen S.; Nolan, Michael C.; Ryan, Erin; Fernandez, Yan; Harker, David;
2015-01-01
We will discuss the results of a planned observation campaign of Near Earth Asteroids (NEAs), 1999 CU3, 2002 GM2, 2002 FG7, and 3691 Bede with instruments on the United Kingdom Infrared Telescope (UKIRT) from 15-Mar-2015 to 28-April 2015 UT. We will study the phase-angle dependence of the reflectance and thermal emission spectra. Recent publications reveal that the assignment of the asteroid class from visible and near-IR spectroscopy can change with phase angle for NEAs with silicate-bearing minerals on their surfaces (S-class asteroids) (Thomas et al. 2014, Icarus 228, 217; Sanchez et al. 2012 Icarus 220, 36). Only three of the larger NEAs have been measured at a dozen phase angles and the trends are not all the same, so there is not yet enough information to create a phase-angle correction. Also, the phase angle effect is not characterized well for the thermal emission including determination of the albedo and the thermal emission. The few NEAs were selected for our study amongst many possible targets based on being able to observe them through a wide range of phase angles, ranging from less than about 10 degrees to greater than 45 degrees over the constrained date range. The orbits of NEAs often generate short observing windows at phase angles higher than 45 deg (i.e., whizzing by Earth and/or close to dawn or dusk). Ultimately, lowering the uncertainty of the translation of asteroid class to meteorite analog and of albedo and size determinations are amongst our science goals. On a few specific nights, we plan to observe the 0.75-2.5 micron spectra with IRTF+SpeX for comparison with UKIRT data including 5-20 micron with UKIRT+UIST/Michelle to determine as best as possible the albedos. To ensure correct phasing of spectroscopic data, we augment with TRAPPIST-telescope light curves and R-band guider image data. Our observations will contribute to understanding single epoch mid-IR and near-IR measurements to obtain albedo, size and IR beaming parameters (the outcomes of thermal models) and asteroid spectral class.
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...
Plan for the Class of 2000. Final Report of the Program Planning Committee.
ERIC Educational Resources Information Center
Wake Forest Univ., Winston Salem, NC.
This report presents the comprehensive academic plan for undergraduate students to be phased in at Wake Forest University (North Carolina) beginning with the class entering in 1996. Four concepts are emphasized in the plan: (1) continued personalization and individualization of the professor-student relationship; (2) establishment of a first-year…
OSUL2013: Fostering Organizational Change through a Grassroots Planning Process
ERIC Educational Resources Information Center
Schlosser, Melanie
2011-01-01
This paper provides background on planning and organizational culture change in libraries and describes a grassroots planning process taking place at the Ohio State University Libraries. Now in its third phase, the process aims to create a long-term plan for the organization while fostering a more collaborative, innovative culture.
A Management Plan for Historic Bridges in Virginia: Update / Scoping Phase.
DOT National Transportation Integrated Search
2014-04-01
"The Management Plan for Historic Bridges in Virginia, completed in 2001 (hereinafter the 2001 Management Plan), : identified the management and treatment needs for 54 bridges in Virginia that were individually eligible for or listed on the National ...
A Comprehensive Approach to Emergency Planning
ERIC Educational Resources Information Center
Worsley, Tracy L.; Beckering, Don
2007-01-01
It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery."…
BWR Servicing and Refueling Improvement Program: Phase I summary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Perry, D.R.
1978-09-01
Under the U.S. Department of Energy sponsorship, General Electric Co. (GE) undertook a study of boiling water reactor (BWR) refueling outages for the purpose of recommending the development and demonstration of critical path time savings improvements. The Tennessee Valley Authority (TVA) joined the study as a subcontractor, providing monitoring assistance and making the Browns Ferry Site available for improvement demonstrations. Agreement was also reached with Georgia Power Co., Power Authority of the State of New York, and Commonwealth Edison Co. for monitoring and data collection at Hatch 1, FitzPatrick, and Quad Cities 1 nuclear plants, respectively. The objective was tomore » identify, develop, and demonstrate improved refueling, maintenance, and inspection procedures and equipment. The improvements recommended in this study are applicable to BWR nuclear plants currently in operation as well as those in the design and construction phases. The recommendations and outage information can be used as a basis to plan and conduct the first outages of new plants and to improve the planning and facilities of currently operating plants. Many of the recommendations can readily be incorporated in plants currently in the design and construction phases as well as in the design of future plants. Many of these recommended improvements can be implemented immediately by utilities without further technical development.« less
NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests
NASA Technical Reports Server (NTRS)
Barta, Daniel J.; Montz, Michael E.
2004-01-01
NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).
Almeida, L; Kashdan, T B; Coelho, R; Albino-Teixeira, A; Soares-da-Silva, P
2008-03-01
To test the hypothesis that trait-curiosity and perceived self-efficacy influence the willingness of healthy subjects to volunteer for participation in Phase I studies. A group of healthy subjects who had never participated in clinical studies ("index group") were invited to participate in a Phase I study. They were assessed with regard to trait curiosity (Curiosity and Exploration Inventory; CEI-T) and perceived self-efficacy (Self-Efficacy Scale; SES) and subjects who accepted the invitation to participate were compared with those who refused and with a group of healthy subjects who had previously participated in clinical studies ("validation group"). A significant positive correlation was found between the willingness to participate and the CEI-T total score (R=0.28; p<0.01), exploratory tendencies (R=0.34; p<0.001), SES total score (R=0.30, p<0.01), initiative and persistence (R=0.29, p<0.01), planning/goal setting (R=0.19, p<0.05) and social self-efficacy (R=0.29; p<0.01). The "index group" subjects who accepted the invitation to participate showed significantly greater CEI-T exploratory tendencies (Z=-3.334, p = 0.001, Mann-Whitney test) and total scores (Z=-2.703, p<0.01) and greater SES total score (Z=-3.131, p<0.01), initiative and persistence (Z=-3.065, p<0.01), planning/goal setting (Z=-2.173, p<0.05) and social self-efficacy (Z=-2.954, p<0.01) than subjects who refused. No differences were found between the subjects in the "index group" who accepted the invitation and subjects in the "validation group". Using a logistic regression model, both CEI-T exploratory tendencies and SES initiative/persistence were significant predictors of participation. Subjects higher in curiosity/exploration and in perceived initiative/persistence are more willing to volunteer for Phase I studies. The impact of these self-selection biases on Phase I study results is unknown but deserves further evaluation.
Barton, Hugh; Grant, Marcus
2013-10-01
The purpose of this paper is to evaluate the progress made by European cities in relation to Healthy Urban Planning (HUP) during Phase IV of the World Health Organization's Healthy Cities programme (2003-2008). The introduction sets out the general principle of HUP, identifying three levels or phases of health and planning integration. This leads on to a more specific analysis of the processes and substance of HUP, which provide criteria for assessment of progress. The assessment itself relies on two sources of data provided by the municipalities: the Annual Review Templates (ARTs) 2008 and the response to the Phase IV General Evaluation Questionnaire. The findings indicate that the evidence from different sources and questions in different sections are encouragingly consistent. The number of cities achieving a good level of understanding and activity in HUP has risen very substantially over the period. In particular, those achieving effective strategic integration of health and planning have increased. A key challenge for the future will be to develop planning frameworks which advance public health concerns in a spatial policy context driven often by market forces. A health in all policies approach could be valuable.
Dynamic simulation of motion effects in IMAT lung SBRT.
Zou, Wei; Yin, Lingshu; Shen, Jiajian; Corradetti, Michael N; Kirk, Maura; Munbodh, Reshma; Fang, Penny; Jabbour, Salma K; Simone, Charles B; Yue, Ning J; Rengan, Ramesh; Teo, Boon-Keng Kevin
2014-11-01
Intensity modulated arc therapy (IMAT) has been widely adopted for Stereotactic Body Radiotherapy (SBRT) for lung cancer. While treatment dose is optimized and calculated on a static Computed Tomography (CT) image, the effect of the interplay between the target and linac multi-leaf collimator (MLC) motion is not well described and may result in deviations between delivered and planned dose. In this study, we investigated the dosimetric consequences of the inter-play effect on target and organs at risk (OAR) by simulating dynamic dose delivery using dynamic CT datasets. Fifteen stage I non-small cell lung cancer (NSCLC) patients with greater than 10 mm tumor motion treated with SBRT in 4 fractions to a dose of 50 Gy were retrospectively analyzed for this study. Each IMAT plan was initially optimized using two arcs. Simulated dynamic delivery was performed by associating the MLC leaf position, gantry angle and delivered beam monitor units (MUs) for each control point with different respiratory phases of the 4D-CT using machine delivery log files containing time stamps of the control points. Dose maps associated with each phase of the 4D-CT dose were calculated in the treatment planning system and accumulated using deformable image registration onto the exhale phase of the 4D-CT. The original IMAT plans were recalculated on the exhale phase of the CT for comparison with the dynamic simulation. The dose coverage of the PTV showed negligible variation between the static and dynamic simulation. There was less than 1.5% difference in PTV V95% and V90%. The average inter-fraction and cumulative dosimetric effects among all the patients were less than 0.5% for PTV V95% and V90% coverage and 0.8 Gy for the OARs. However, in patients where target is close to the organs, large variations were observed on great vessels and bronchus for as much as 4.9 Gy and 7.8 Gy. Limited variation in target dose coverage and OAR constraints were seen for each SBRT fraction as well as over all four fractions. Large dose variations were observed on critical organs in patients where these organs were closer to the target.
Diverter AI based decision aid, phases 1 and 2
NASA Technical Reports Server (NTRS)
Sexton, George A.; Bayles, Scott J.; Patterson, Robert W.; Schulke, Duane A.; Williams, Deborah C.
1989-01-01
It was determined that a system to incorporate artificial intelligence (AI) into airborne flight management computers is feasible. The AI functions that would be most useful to the pilot are to perform situational assessment, evaluate outside influences on the contemplated rerouting, perform flight planning/replanning, and perform maneuver planning. A study of the software architecture and software tools capable of demonstrating Diverter was also made. A skeletal planner known as the Knowledge Acquisition Development Tool (KADET), which is a combination script-based and rule-based system, was used to implement the system. A prototype system was developed which demonstrates advanced in-flight planning/replanning capabilities.
NASA Technical Reports Server (NTRS)
1973-01-01
Two orbital test plans were prepared to verify one of the passive cryogenic storage tank/feedline candidate designs. One plan considered the orbital test article to be launched as a dedicated payload using an Atlas F burner launching configuration. The second plan proposed to launch the orbital test article as a secondary payload on the Titan E/Centaur proof flight. The secondary payload concept was pursued until January 1973, when work to build the hardware for this phase of the contract was terminated for lack of a sponsor for the flight. The dedicated payload launched on an Atlas F is described.
Research and Applications Modules (RAM), phase B study
NASA Technical Reports Server (NTRS)
1972-01-01
The research and applications modules (RAM) system is discussed. The RAM is a family of payload carrier modules that can be delivered to and retrieved from earth orbit by the space shuttle. The RAM's capability for implementing a wide range of manned and man-tended missions is described. The rams have evolved into three types; (1) pressurized RAMs, (2) unpressurized RAMs, and (3) pressurizable free-flying RAMs. A reference experiment plan for use as a baseline in the derivation and planning of the RAM project is reported. The plan describes the number and frequency of shuttle flights dedicated to RAM missions and the RAM payloads for the identified flights.
An experiment of used palm oil refinery using the value engineering method
NASA Astrophysics Data System (ADS)
Sumiati; Waluyo, M.
2018-01-01
Palm Oil is one of prime materials which very necessary for Indonesia. In the development of palm oil industry the constraint which faced is raw material availability and the economic crisis that attack Indonesia which cause increasing of cost industry so that the salaes price become very expensive . With using alternative raw material namely used palm oil them be made palm oil design to solve this problems. In the designing which comply the consideration of good pal oil planning aspect be use value engineer study. While the criteria parameter of hygienic palm oil which obtained from the questioner area free fatty acid, water content, Iodine number, peroxide number, odor, taste and the color. The research which use value engineer study is throught any phase that is information phase, analyzes phase, creative phase, development phase and presentation phase. This research began with doing the identification of palm oil demand, continued by methodology development in order to measure oil design. By using creative process could be obtained flow rate position, the amount of adsorbent and the best settling time for palm oil alternative that is in the flow rate 70 ml/sec, 4% of adsorbent and the 70 minute for the settling time with free fatty acid value: 0.299. While the best palm oil alternative are palm oil with free fatty acid value = 0.299, water content = 0.31, Iodine number = 40.08, Peroxide number = 3.72, odor and taste = Normal, the color = Normal. The Evalution which done by value engineer study generate the value from alternative palm oil is 1.330 and market palm oil 1.392. Thus, can be conclude thet the value engineer study can be good implemented in the alternative palm oil planning so that alternative palm oil can be produced largely because they have better value that market palm oil and appropriate for little industries.
Fiscal year 1981 US corn and soybeans pilot preliminary experiment plan, phase 1
NASA Technical Reports Server (NTRS)
Livingston, G. P.; Nedelman, K. S.; Norwood, D. F.; Smith, J. H. (Principal Investigator)
1981-01-01
A draft of the preliminary experiment plan for the foreign commodity production forecasting project fiscal year 1981 is presented. This draft plan includes: definition of the phase 1 and 2 U.S. pilot objectives; the proposed experiment design to evaluate crop calendar, area estimation, and area aggregation components for corn and soybean technologies using 1978/1979 crop-year data; a description of individual sensitivity evaluations of the baseline corn and soybean segment classification procedure; and technology and data assessment in support of the corn and soybean estimation technology for use in the U.S. central corn belt.
NASA Technical Reports Server (NTRS)
1976-01-01
Payload mission control concepts are developed for real time flight operations of STS. Flight planning, training, simulations, and other flight preparations are included. Payload activities for the preflight phase, activity sequences and organizational allocations, and traffic and experience factors to establish composite man-loading for joint STS payload activities are identified for flight operations from 1980 to 1985.
Space Weather Action Plan Solar Radio Burst Phase 1 Benchmarks and the Steps to Phase 2
NASA Astrophysics Data System (ADS)
Biesecker, D. A.; White, S. M.; Gopalswamy, N.; Black, C.; Love, J. J.; Pierson, J.
2017-12-01
Solar radio bursts, when at the right frequency and when strong enough, can interfere with radar, communication, and tracking signals. In severe cases, radio bursts can inhibit the successful use of radio communications and disrupt a wide range of systems that are reliant on Position, Navigation, and Timing services on timescales ranging from minutes to hours across wide areas on the dayside of Earth. The White House's Space Weather Action Plan asked for solar radio burst intensity benchmarks for an event occurrence frequency of 1 in 100 years and also a theoretical maximum intensity benchmark. The benchmark team has developed preliminary (phase 1) benchmarks for the VHF (30-300 MHz), UHF (300-3000 MHz), GPS (1176-1602 MHz), F10.7 (2800 MHz), and Microwave (4000-20000) bands. The preliminary benchmarks were derived based on previously published work. Limitations in the published work will be addressed in phase 2 of the benchmark process. In addition, deriving theoretical maxima requires additional work, where it is even possible to, in order to meet the Action Plan objectives. In this presentation, we will present the phase 1 benchmarks, the basis used to derive them, and the limitations of that work. We will also discuss the work that needs to be done to complete the phase 2 benchmarks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapet, Olivier, E-mail: olivier.chapet@chu-lyon.fr; Udrescu, Corina; Department of Medical Physics, Centre Hospitalier Lyon Sud, Pierre Benite
2014-02-01
Purpose: This study assessed the contribution of ahyaluronic acid (HA) injection between the rectum and the prostate to reducing the dose to the rectal wall in stereotactic body radiation therapy (SBRT). Methods and Materials: As part of a phase 2 study of hypofractionated radiation therapy (62 Gy in 20 fractions), the patients received a transperineal injection of 10 cc HA between the rectum and the prostate. A dosimetric computed tomographic (CT) scan was systematically performed before (CT1) and after (CT2) the injection. Two 9-beam intensity modulated radiation therapy-SBRT plans were optimized for the first 10 patients on both CTs accordingmore » to 2 dosage levels: 5 × 6.5 Gy (PlanA) and 5 × 8.5 Gy (PlanB). Rectal wall parameters were compared with a dose–volume histogram, and the prostate–rectum separation was measured at 7 levels of the prostate on the center line of the organ. Results: For both plans, the average volume of the rectal wall receiving the 90% isodose line (V90%) was reduced up to 90% after injection. There was no significant difference (P=.32) between doses received by the rectal wall on CT1 and CT2 at the base of the prostate. This variation became significant from the median plane to the apex of the prostate (P=.002). No significant differences were found between PlanA without HA and PlanB with HA for each level of the prostate (P=.77, at the isocenter of the prostate). Conclusions: HA injection significantly reduced the dose to the rectal wall and allowed a dose escalation from 6.5 Gy to 8.5 Gy without increasing the dose to the rectum. A phase 2 study is under way in our department to assess the rate of acute and late rectal toxicities when SBRT (5 × 8.5 Gy) is combined with an injection of HA.« less
[Systematization of nursing assistance: subsidies for implementation].
Hermida, Patrícia Madalena Vieira; Araújo, Izilda Esmênia Muglia
2006-01-01
This study reviews national literature about the Systematization of Nursing Assistance in order to detect and reflect on the phases of its implementation. An electronic search of the data bases at LILACS, MEDLINE and BDENF revealed 61 published studies on this subject in nursing journals. This present study focuses on negative experiences regarding its implementation and presents a strategy for its successful implementation. The plan was observed to have various phases, but it was observed that the institution's structure, facilities and demands had to be first studied. It was concluded that the process for its implementation would be complex and difficult, but could contribute towards improving the quality of nursing care.
Fly-by-light flight control system technology development plan
NASA Technical Reports Server (NTRS)
Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.
1990-01-01
The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.
DOT National Transportation Integrated Search
2016-08-01
The Participant Training and Stakeholder Education Plan is a high-level plan for the recruitment and training of all automobile drivers, pedestrians, transit drivers, traffic management center (TMC) operators, and installation and maintenance technic...
Setting Strategic Directions Using Critical Success Factors.
ERIC Educational Resources Information Center
Bourne, Bonnie; Gates, Larry; Cofer, James
2000-01-01
Describes implementation of a system-level planning model focused on institutional improvement and effectiveness at the University of Missouri. Details implementation of three phases of the strategic planning model (strategic analysis, strategic thinking/decision-making, and campus outreach/systems administration planning); identifies critical…
Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan
DOT National Transportation Integrated Search
2017-10-17
This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...
Plan, Focusing on Recreational Use and Nutrient Reduction Louisiana Trustees Release Fourth Draft Restoration Plan, Focusing on Recreational Use and Nutrient Reduction Read More... Florida Trustee Implementation Group Releases Phase V.2 Final Restoration Plan Florida Trustee Implementation Group Releases
40 CFR 35.1650-2 - Limitations on awards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... which shall be completed before the project is awarded. (b) Before awarding Phase 2 projects, the Regional Administrator shall further determine that: (1) When a Phase 1 project was awarded, the final... restoration plan selected under the Phase 1 project must be implemented under a Phase 2 cooperative agreement...
75 FR 51988 - Bison Pipeline LLC; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-24
... (Certificate) in order to construct the Project in two phases; first to meet the service requirements of the... rates for transportation service approved in the Order. During the first phase, Bison would construct... and related appurtenances as authorized in the Order (Phase 1). During the second phase, Bison plans...
Phase III Early Restoration Public Meetings | NOAA Gulf Spill Restoration
Archive Home Phase III Early Restoration Public Meetings Phase III Early Restoration Public Meetings share Posted on December 6, 2013 | Assessment and Early Restoration Restoration Area Title: Phase III Early on the draft plan for the third phase of Early Restoration, which proposes more than $625 million in
32 CFR 651.49 - Preliminary phase.
Code of Federal Regulations, 2010 CFR
2010-07-01
... data, including required studies. (3) Preparation of draft and final EISs (DEISs and FEISs), and... relationship between the timing of the preparation of environmental analyses and the tentative planning and..., preparation of a general expected schedule for future specific implementing (tiered) actions that will involve...
32 CFR 651.49 - Preliminary phase.
Code of Federal Regulations, 2011 CFR
2011-07-01
... data, including required studies. (3) Preparation of draft and final EISs (DEISs and FEISs), and... relationship between the timing of the preparation of environmental analyses and the tentative planning and..., preparation of a general expected schedule for future specific implementing (tiered) actions that will involve...
Planning for Materials Processing in Space
NASA Technical Reports Server (NTRS)
1977-01-01
A systems design study to describe the conceptual evolution, the institutional interrelationshiphs, and the basic physical requirements to implement materials processing in space was conducted. Planning for a processing era, rather than hardware design, was emphasized. Product development in space was examined in terms of fluid phenomena, phase separation, and heat and mass transfer. The effect of materials processing on the environment was studied. A concept for modular, unmanned orbiting facilities using the modified external tank of the space shuttle is presented. Organizational and finding structures which would provide for the efficient movement of materials from user to space are discussed.