Annual Report: Photovoltaic Subcontract Program FY 1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Summers, K. A.
1991-03-01
This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less
NREL photovoltaic program FY 1997 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, R.D.; Hansen, A.; Smoller, S.
1998-06-01
This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less
Photovoltaic Subcontract Program. Annual report, FY 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-03-01
This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less
Photovoltaic Subcontract Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surek, Thomas; Catalano, Anthony
1993-03-01
This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less
The Department of the Navy Subcontracting Program Update
2014-08-01
calculaCon of single FY acCvity at the contract level Tot Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014 Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0
NREL Photovoltaic Program FY 1995 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-06-01
This report summarizes the in-house and subcontracted R&D activities from Oct. 1994 through Sept. 1995; their objectives are to conduct basic, applied, and engineering research, manage subcontracted R&D projects, perform research complementary to subcontracted work, develop and maintain state-of-the-art measurement and device capabilities, develop PV manufacturing technology and modules, transfer results to industry, and evolve viable partnerships for PV systems and market development. The research activities are grouped into 5 sections: crystalline Si and advanced devices, thin-film PV, PV manufacturing, PV module and system performance and engineering, and PV applications and market development.
NREL Photovoltaic Program FY 1996 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's andmore » the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.« less
NREL Photovoltaic Program. FY 1994 annual report, October 1, 1993--September 30, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-06-01
This report summarizes the in-house and subcontracted research and development activities under the National renewable Energy Laboratory (NREL) Photovoltaics (PV) program for fiscal year 1994. Research is organized under the following areas; PV program management; crystalline silicon and advanced devices; thin-film PV technologies; PV manufacturing; PV module and system performance and engineering; and PV applications and markets.
NASA Technical Reports Server (NTRS)
1990-01-01
It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, R. D.; Hansen, A.
1999-07-19
This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) from October 1, 1997 through September 30, 1998 (FY 1998). The NCPV is part of the U.S. Department of Energy's (DOE's) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996-2000. The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy--as an industry and as an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership inmore » research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NCPV provides leadership and support to the national program toward achieving its mission and goals.« less
Veterans’s Medical Care: FY2014 Appropriations
2013-08-14
work therapy, veterans produce items for sale or undertake subcontracts to provide certain products and/or services, such as providing temporary...staffing to a private firm. Funds collected from the sale of these products and/or services are deposited into the MCCF. g. The parking program...medical care for the following 15 illnesses or conditions: esophageal cancer; lung cancer; breast cancer; bladder cancer; kidney cancer; leukemia
High Technology Engineering Services, Inc. fiscal year 1993 and 1994 research and development report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This document has been prepared by the Professional Staff of High Technology Engineering Services, Inc. (HTES) for fiscal year (FY) 1993. Work was performed for various aspects of mechanical design and analysis, materials development and properties quantification, nuclear environment performance, and engineering program prioritization. The tasks enumerated in the subcontract, attachment B are: 1. Assist in preparation of final R&D report for SDC detector development. 2. Subcontractor shall make contributions to the development of innovative processes for the manufacture of quasi- isotropic, enhanced thermal conductivity compression molded advanced composite materials. 3. Perform finite element analysis as it relates to themore » Superconducting Super Collider Silicon Tracking System, both mechanical and thermal, of very thin section advanced composite materials. 4. Subcontractor shall perform technical studies, reviews, and assessments of the current program for advanced composites materials processing and testing. 5. Subcontractor shall attend meetings and discussions as directed by MEE-12 technical representative. Unfortunately during the course of FY93, technical and financial challenges prevailed against the aggressive goals set for the program. In point of fact, less than 25% of the contract value was able to be expended due to technical delays and programmatic funding cuts. Also, contracting difficulties with the SSC Lab and financial burdens at Los Alamos totally stopped progress on the subject subcontract during the whole of FY94. This was a great blow to me and the HTES, Inc. technical staff. Despite the negative influences over the years, significant progress was made in materials properties quantification and development of essential research and development documentation. The following brief report and attendant appendices will address these achievements.« less
Illinois Institute of Technology Report: IITB52 Antifoamer for Alternative Salt Processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, D.P.
2001-06-27
The attached report is a summary of the work performed by Dr. Darsh Wasan, Dr. Alex Nikolov, and their researchers at the Illinois Institute of Technology (IIT) during FY01. IIT developed the IITB52 antifoam for SRTC in FY00 to minimize the foam produced during precipitation, washing and concentration of cesium and potassium tetraphenyl borate precipitate. The IITB52 antifoam has been very successful during continuous processing (prototypical of plant operation). However, there were several key issues where SRTC needed the experience and knowledge of IIT to resolve. As a result a subcontract was set up with Dr. Wasan and Dr. Alexmore » Nikolov during FY01. This subcontract requested IIT to perform the basic research necessary to understand the foaming mechanism and explain the effectiveness of the IITB52 antifoam agent in the Small Tank Tetraphenylborate Process (STTP).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
The Department of Energy (Department) and Fluor Daniel Fernald (Fluor Daniel) implemented two work force restructurings at the Fernald Environmental Management Project between Fiscal Years (FY) 1994 and 1996. During the restructurings, the Department`s cost for temporary service subcontracts increased from $2.8 million to $9.8 million annually. The objective of this audit was to determine whether Fluor Daniel utilized temporary service agreements in an economical and efficient manner and in accordance with the policy and goals of the Department`s Work Force Restructuring Program.
Preaward Evaluation and Responsibility Determination of Foreign Contractors.
1988-12-01
abroad. In fiscal year 1987 (FY 87) alone more than $2.1 billion in DOD contracts (exclusive of subsistence, petroleum, construction and support services...dollars. More than $1.1 billion in DOD contracts and subcontracts (exclusive of subsistence, petroleum, construction and support services) were awarded to...Germany, in FY 87 [Ref. 21. Significant amounts in construction and base services contracts are also awarded yearly to support American troops stationed
U.S. Department of Energy Photovoltaic Energy Program Contract Summary: Fiscal Year 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surek, T.
2001-02-21
This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) and U.S. Department of Energy (DOE) National Photovoltaics Program from October 1, 1999, through September 30, 2000 (FY 2000). The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy-as an industry and an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in themore » world market. The NCPV is part of the National PV Program and provides leadership and support to the national program toward achieving its mission and goals. This Contract Summary for fiscal year (FY) 2000 documents some 179 research projects supported by the PV Program, performed by 107 organizations in 32 states, including 69 projects performed by universities and 60 projects performed by our industry partners. Of the total FY 2000 PV Program budget of $65.9 million, the industry and university research efforts received $36.9 million, or nearly 56%. And, of this amount, more than 93% was for contractors selected on a competitive basis. Much of the funding to industry was matched by industry cost-sharing. Each individual effort described in this summary represents another step toward improving PV manufacturing, performance, cost, and applications, and another step toward accomplishing the DOE PV Program's overall mission.« less
U.S. Department of Energy photovoltaic energy program contract summary, fiscal year 1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surek, T.; Hansen, A.
2000-02-17
This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) and US Department of Energy (DOE) National Photovoltaics Program from October 1, 1998, through September 30, 1999 (FY 1999). The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy as an industry and an energy resource. The two primary goals of the national program are to (1) maintain the US industry's world leadership in research and technology development and (2) help the US industry remain a major, profitable force inmore » the world market. The NCPV is part of the National PV Program and provides leadership and support to the national program toward achieving its mission and goals.« less
LDRD 2013 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bookless, W.
This LDRD project establishes a research program led by Jingguang Chen, who has started a new position as a Joint Appointee between BNL and Columbia University as of FY2013. Under this project, Dr. Chen will establish a new program in catalysis science at BNL and Columbia University. The LDRD program will provide initial research funding to start research at both BNL and Columbia. At BNL, Dr. Chen will initiate laboratory research, including hiring research staff, and will collaborate with the existing BNL catalysis and electrocatalysis research groups. At Columbia, a subcontract to Dr. Chen will provide startup funding for hismore » laboratory research, including initial graduate student costs. The research efforts will be linked under a common Catalysis Program in Sustainable Fuels. The overall impact of this project will be to strengthen the BNL catalysis science program through new linked research thrusts and the addition of an internationally distinguished catalysis scientist.« less
48 CFR 2019.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705-4 Reviewing the subcontracting plan...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 619.705-6-70 - Reporting responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...
48 CFR 219.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business firms specifically identified in the subcontracting plan. Notifications shall be in writing and... SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business... business concerns shall include subcontracts with historically black colleges and universities and minority...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 3019.705 - Responsibilities for the contracting officer under the subcontracting program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND... notify the Contracting officer in writing at least 30 days in advance of entering into any subcontract or...
1990-01-01
This report presents a variety of subcontract data collected from Department of Defense (DOD) large business firms that have received at least one...award in excess of $500,000 ($1,000,000 for construction). Public Law 95-507 requires that these contractors establish a small business and small...disadvantaged business subcontracting program and report to DOD quarterly, using Standard Form 295, on subcontract awards made to these types of firms
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System NUCLEAR REGULATORY COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 319.705...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
48 CFR 970.1907 - The Small Business Subcontracting Program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
48 CFR 19.708 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...
14 CFR § 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
13 CFR 126.701 - Can these subcontracting percentages requirements change?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Can these subcontracting percentages requirements change? 126.701 Section 126.701 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.701 Can these subcontracting percentages...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...
48 CFR 19.707 - The Small Business Administration's role in carrying out the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... nature; and (4) Evaluate compliance with subcontracting plans, either on a contract-by-contract basis, or...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
1995-01-01
disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has a section for each of the...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and disadvantaged businesses. The
1994-01-01
disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has section for each of the Military...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and small disadvantaged businesses. The
Argonne National Laboratory technology transfer report, FY 1987
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-11-01
In 1985 Argonne established the Technology Transfer Center (TTC). As of the end of FY 1987, the TTC has a staff equivalent to four full-time professionals, two secretaries, and two student aides; FY 1987 ORTA funding was $220K. A network of technology transfer representatives provides windows into and out of Argonne's technical divisions on technology transfer matters. The TTC works very closely with the ARCH Develoment Corporation, a not-for-profit corporation set up to commercialize selected Argonne and University of Chicago patents. The goal of the Technology Transfer Center at Argonne is to transfer technology developed at Argonne to the domesticmore » private sector by whatever means is most effective. The strategies by which this is accomplished are numerous and the TTC is, in effect, conducting a number of experiments to determine the most effective strategies. These include cooperative RandD agreements, work-for-others contracts, subcontracting to industry, formation of joint ventures via ARCH, residencies by industry staff at Argonne and vice versa, patent licensing and, of course, conferences, workshops and visits by industry and to industry.« less
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...
Code of Federal Regulations, 2010 CFR
2010-10-01
...-based system for small business subcontracting program reporting. Failure to make a good faith effort to... planned subcontracting in support of the specific contract, except that indirect costs incurred for common...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2011 CFR
2011-10-01
... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2013 CFR
2013-10-01
... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...
13 CFR 121.411 - What are the size procedures for SBA's Section 8(d) Subcontracting Program?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the size procedures for SBA's Section 8(d) Subcontracting Program? 121.411 Section 121.411 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and Standards...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...
13 CFR 121.410 - What are the size standards for SBA's Section 8(d) Subcontracting Program?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Size Eligibility Requirements for Government Procurement § 121.410 What are the size standards for SBA... Small Business Act, a concern is small for subcontracts which relate to Government procurements if it...
Small Volume Fuel Testers Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schoegl, I.; McNenly, M. J.; Killingsworth, N. J.
Micro-liter fuel ignition testing (μ-FIT) is based on the premise that characteristics FREI (Flames with Repetitive Extinction and Ignition, i.e. cyclically occurring combustion events within heated capillaries), are linked to fuel properties. In early FY16, proof-of-concept measurements with primary reference fuel (PRF) mixtures, i.e. blends of n-heptane and iso-octane, yielded clear evidence for the feasibility of the approach. Our experiments showed that it is critical to accurately link observed flame positions to local temperatures, which provides information on ignition, extinction and flame propagation, all of which are known to be impacted by fuel properties. In FY16, one major hurdle wasmore » uncertainty of temperature calibration, which required significant efforts for corrective action that were not included in the original scope of work. Temperature calibrations are obtained by translating a thermocouple within the capillary in absence of a flame. While measurements have good repeatability when accounting for transient and insertion effects, results from nominally identical thermocouples reveal unacceptable uncertainty (up to ±50K), which is attributed to variations in thermocouple placement and manufacturing tolerances. This issue is currently being resolved by switching to non-intrusive optical temperature measurements. Updates are expected to yield uncertainties of less than ±10K, while also eliminating transient and insertion effects. The experimental work was complemented by computational efforts where it was shown that a simplified Lagrangian zero-D model with detailed kinetics yields fuelspecific differentiation of ignition temperatures for simple fuels that are consistent with experiments. Further, a 2D transient model was implemented in OpenFOAM to investigate combustion behavior of simple fuels at elevated pressure. In an upcoming visit to LLNL, more advanced simulations using LLNL’s computational tools (e.g. zero-RK) are planned, which will yield additional numerical insights on FREI behavior of more realistic spark ignited (SI) engine fuel surrogates. As there is a lag between DOE FY16 and the time frame of the LSU subcontract, it is anticipated that deliverables outlined in the scope of work will be met by the end of the subcontract (January 2017).« less
48 CFR 2919.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...
13 CFR 125.3 - Subcontracting assistance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... other resources and tools; (4) Counseling small business concerns on how to market themselves to large... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Subcontracting assistance. 125.3 Section 125.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION GOVERNMENT CONTRACTING PROGRAMS...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 52.219-26 - Small Disadvantaged Business Participation Program-Incentive Subcontracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACT CLAUSES Text of Provisions and Clauses 52.219-26 Small Disadvantaged Business Participation... the following: Small Disadvantaged Business Participation Program—Incentive Subcontracting (OCT 2000... its offer to try to award a certain amount to small disadvantaged business concerns in the North...
48 CFR 9.104-3 - Application of standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the... requires a subcontracting plan pursuant to Subpart 19.7, The Small Business Subcontracting Program, the... prospective contractor's responsibility. (d)(1) Small business concerns. Upon making a determination of...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
48 CFR 3052.219-70 - Small Business subcontracting program reporting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...
Federal Funding for Health Security in FY2018.
Watson, Crystal; Watson, Matthew; Kirk Sell, Tara
This article is the latest in an annual series analyzing federal funding for health security programs. It examines proposed funding in the President's Budget Request for FY2018 and provides updated amounts for FY2017 and actual funding for FY2010 through FY2016. The proposed FY2018 budget for health security-related programs represents a significant decrease in funding from prior years and previous administrations. In total, the President's proposed FY2018 budget includes $12.45 billion for health security-related programs, an estimated decrease in funding of $1.25 billion, or 9%, from the estimated $13.71 billion in FY2017 and an 11% decrease from the FY2016 actual funding level of $13.99 billion. Most FY2018 health security funding ($6.67 billion, 54%) would go to programs with multiple-hazard and preparedness goals and missions, representing a 14% decrease in this funding compared to FY2017. Radiological and nuclear security programs would receive 20% ($2.48 billion) of all health security funding, a slight decrease of 2% from the prior year. Biosecurity programs would be funded at $1.53 billion (12% of health security funding) in FY2018, a decrease of 6% compared to FY2017. Chemical security programs would represent 3% ($389.7 million) of all health security funding in FY2018, a 9% decrease from the prior year. Finally, 11% of health security funding ($1.39 billion) would be dedicated to pandemic influenza and emerging infectious diseases programs, the only category of funding to see an increase (3%) above FY2017.
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...
48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...
Federal funding for health security in FY2015.
Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew
2014-01-01
Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs.
Federal Funding for Health Security in FY2015
Sell, Tara Kirk; Watson, Matthew
2014-01-01
Previous articles in this series have provided funding information for federal civilian biodefense programs and programs focused on radiological and nuclear preparedness and consequence management. This year the authors have expanded the focus of the analysis to US federal funding for health security. This article provides proposed funding amounts for FY2015, estimated amounts for FY2014, and actual amounts for FY2010 through FY2013 in 5 domains critical to health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. PMID:24988432
48 CFR 3019.705-1 - General support for the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705-1 General support for the program. In any...
13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?
Code of Federal Regulations, 2014 CFR
2014-01-01
... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1990-01-01
The Objectives, FY 1990 Plans, Approach, and FY 1990 Milestones for the Structural Mechanics Division's research programs are presented. FY 1989 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, K. S.
1986-01-01
Presented are the Objectives, FY 1986 Plans, Approach, and FY 1986 Milestones for the Structures and Dynamics Division's research programs. FY 1985 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
Subcontracted activities related to TES for building heating and cooling
NASA Technical Reports Server (NTRS)
Martin, J.
1980-01-01
The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandwisch, D.W.
1997-02-01
The objectives of this subcontract are to advance Solar Cells, Inc.`s (SCI`s) photovoltaic manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. Activities during the second year of the program concentrated on process development, equipment design and testing, quality assurance, and ES and H programs. These efforts broadly addressed the issues of the manufacturing process for producing thin-film monolithic CdS/CdTe photovoltaic modules.
Satellite Power System (SPS) FY 79 program summary
NASA Technical Reports Server (NTRS)
1980-01-01
The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1988-01-01
Presented are the Objectives, FY 1988 Plans, Approach, and FY 1988 Milestones for the Structures and Dynamics Division (Langley Research Center) research programs. FY 1987 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1987-01-01
This paper presents the Objectives, FY 1987 Plans, Approach, and FY 1987 Milestones for the Structures and Dynamics Division's research programs. FY 1986 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, K. S.
1985-01-01
The objectives, FY 1985 plans, approach, and FY 1985 milestones for the Structures and Dynamics Division's research programs are presented. The FY 1984 accomplishments are presented where applicable. This information is useful in program coordination with other government organizations in areas of mutual interest.
Enhanced surveillance program FY97 accomplishments. Progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mauzy, A.; Laake, B.
1997-10-01
This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics;more » diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.« less
FY 1998 Proposed Rail Improvement Program Supplement
DOT National Transportation Integrated Search
1997-01-01
This FY 1998 Proposed Rail Improvement Program Supplement contains those rail plan amendments which have been published subsequent to the FY 1997 Proposed Rail Improvement program supplement. This document also contains the benefit/cost methodology u...
78 FR 17281 - Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... DEPARTMENT OF STATE [Public Notice 8241] Notice of Public Meeting on FY 2014 U.S. Refugee Admissions Program There will be a meeting on the President's FY 2014 U.S. Refugee Admissions Program on... meeting's purpose is to hear the views of attendees on the appropriate size and scope of the FY 2014 U.S...
National Water Program FY 2015 Performance, Trends and Best Practices Report
This Report includes final FY 2015 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2015 National Water Program Guidance Addendum.
National Water Program Performance FY 2017 Trends, and Best Practices Report
This report includes FY 2017 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2016-2017 National Water Program Guidance.
Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixthmore » sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.« less
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1989-01-01
The Objectives, FY 1989 Plans, Approach, and FY 1989 Milestones for the Structural Mechanics Division's research programs are presented. Fiscal year 1988 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
75 FR 70031 - Antitrust Division
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
...) operate a branding program based upon distinctive trademarks to create high customer awareness of, demand... or subcontract a branding program; (vii) create printed and/or electronic materials for distribution...
United States Nuclear Data Program (USNDP)
Report FY 2016 Annual Report FY 2015 Annual Report FY 2014 Annual Report FY 2013 Annual Report FY 2012 Annual Report FY 2011 Annual Report FY 2010 Annual Report FY 2009 Annual Report FY 2008 Annual Report FY 2007 Annual Report FY 2006 Annual Report FY 2005 Annual Report FY 2004 Final Report FY 2003 Final
76 FR 35918 - Susan Harwood Training Grant Program, FY 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2011. Funding Opportunity No.: SHTG-FY-11... of approximately $4.7 million for Susan Harwood Training Program grants under the following...
75 FR 29783 - Susan Harwood Training Grant Program, FY 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $8 million for the Susan Harwood Training Grant Program for Capacity Building...
75 FR 38837 - Susan Harwood Training Grant Program, FY 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... DEPARTMENT OF LABOR Occupational Safety and Health Administration Susan Harwood Training Grant... Funding Opportunity for Susan Harwood Training Grant Program, FY 2010. Funding Opportunity No.: SHTG-FY-10... availability of approximately $2.75 million for the Susan Harwood Training Grant Program for Targeted Topic...
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1990-01-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less
Analysis of Rotary Aircraft Alternatives for NATO SOF Organic Air Wing
2012-06-01
analysis with an assumed program start in 2013 and an end in 2019 to determine the impact of short program duration on platform selection. D...FY12 GO\\ LR,~itl\\ l Sli LABOR H13 (J()VI R\\\\iFI\\TSE I AROR FY14 GOVLR\\\\iLI\\ I Sl:. LABOR H15 SI:.PO CSS FY II SII’O CSS FY 12 SEI’() CSS fY 13
Waste isolation safety assessment program. Task 4. Third contractor information meeting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-06-01
The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less
77 FR 5617 - Alternative Transportation in Parks and Public Lands Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-03
... selection of projects, funded with Fiscal Year (FY) 2011 and 2012 appropriations, and previously unallocated... Program FY 2011 FY 2012 Appropriation $26,844,035 $13,450,000 Oversight Deduction (0.5%) (134,500) (67,530... the program are to conserve natural, historical, and cultural resources; reduce congestion and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7101 Purpose. The VA Mentor-Protégé Program is... businesses (VOSBs) in enhancing their capabilities to perform contracts and subcontracts for VA. The Mentor...
FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2010
2010-01-01
The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
An Assessment of Operational Energy Capability Improvement Fund (OECIF) Programs 17-S-2544
2017-09-19
persistently attack key operational energy problems . OECIF themes are summarized in Table 1, and Appendix A includes more detail on the programs within... problems FY 2014 Analytical methods and tools FY 2015 Improving fuel economy for the current tactical ground fleet FY 2016 Increasing the operational...involve a variety of organizations to solve operational energy problems . In FY 2015, the OECIF program received a one-time $14.1M Congressional plus-up
1985-01-01
equipped with data collection platforms (DCP) by the end of FY 1985. (b) Communication. The DCP’s transmit the remote gaging station data over the...activated 78 platforms in FY 84 bringing the total number of operating stations to 85. Plans are to activate seven more platforms in FY 85. c. Acoustic... Platforms . The total program cost for FY 1984 is shown in Table VI-3. The total program cost for FY 1985 will be $172,720. (2) National Weather Service
Black liquor gasification phase 2D final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kohl, A.L.; Stewart, A.E.
1988-06-01
This report covers work conducted by Rockwell International under Amendment 5 to Subcontract STR/DOE-12 of Cooperative Agreement DE-AC-05-80CS40341 between St. Regis Corporation (now Champion International) and the Department of Energy (DOE). The work has been designated Phase 2D of the overall program to differentiate it from prior work under the same subcontract. The overall program is aimed at demonstrating the feasibility of and providing design data for the Rockwell process for gasifying Kraft black liquor. In this process, concentrated black liquor is converted into low-Btu fuel gas and reduced melt by reaction with air in a specially designed gasification reactor.
24 CFR 882.412 - Subcontracting of owner services.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR... HUD approval, rents which exceed the appropriate Moderate Rehabilitation Fair Market Rent for a unit...
76 FR 23272 - FY 2011 Emergency Food Assistance Annual Program Statement
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-26
... Emergency Food Assistance Annual Program Statement Pursuant to the Food for Peace Act of 2008 and the Foreign Assistance Act of 1961 (FAA), notice is hereby given that the FY 2011 Emergency Food Assistance... to review, the FY 2011 Emergency Food Assistance Annual Program Statement is available via the Food...
48 CFR 19.702 - Statutory requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business, HUBZone small business, small disadvantaged business, and women-owned small business concerns..., HUBZone small business, small disadvantaged business, and women-owned small business concerns. (a) Except... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.702 Statutory requirements...
Materials Division research and technology accomplishments for FY 87 and plans for FY 88
NASA Technical Reports Server (NTRS)
Brinkley, Kay L.
1988-01-01
The research program of the Materials Division is presented as FY 87 accomplishments and FY 88 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.
FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2012
2012-01-01
The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…
FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2011
2011-01-01
The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…
Materials Division research and technology accomplishments for FY 89 and plans for FY 90
NASA Technical Reports Server (NTRS)
Brinkley, Kay L.
1990-01-01
The research program of the Materials Division is presented as FY-89 accomplishments and FY-90 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.
FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2006
2006-01-01
The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…
Materials Division research and technical accomplishments for FY 1988 and plans for FY 1989
NASA Technical Reports Server (NTRS)
Brinkley, Kay L.
1989-01-01
The research program of the Materials Division is presented as FY-88 accomplishments and FY-89 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material is useful in program coordination with other government organizations, universities, and industry in areas of mutual interest.
NASA earth science and applications division: The program and plans for FY 1988-1989-1990
NASA Technical Reports Server (NTRS)
1988-01-01
Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.
Federal agency biodefense funding, FY2012-FY2013.
Franco, Crystal; Sell, Tara Kirk
2012-06-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2012. This article updates those figures with budgeted amounts for FY2013, specifically analyzing the budgets and allocations for civilian biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. As in previous years, our analysis indicates that the majority (>90%) of the "biodefense" programs included in the FY2013 budget have both biodefense and non-biodefense goals and applications-that is, programs to improve infectious disease research, public health and hospital preparedness, and disaster response more broadly. Programs that focus solely on biodefense represent a small proportion (<10%) of our analysis, as the federal agencies continue to prioritize all-hazards preparedness. For FY2013, the federal budget for programs focused solely on civilian biodefense totals $574.2 million, and the budget for programs with multiple goals and applications, including biodefense, is $4.96 billion, for an overall total of $5.54 billion.
Laboratory Directed Research and Development Program FY 2006 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sjoreen, Terrence P
2007-04-01
The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the US Departmental of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, 'Laboratory Directed Research and Development' (April 19, 2006), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2006. The associated FY 2006 ORNL LDRD Self-Assessment (ORNL/PPA-2007/2) provides financial data about themore » FY 2006 projects and an internal evaluation of the program's management process.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... charges fees to designated contract markets and registered futures associations to recover the costs..., as explained below. The FY 2010 fee includes adjustments to program costs incurred in FY 2008 and 2009, which are being revised as a result of an internal review of program costs. The FY 2010 fee...
1996-12-27
consolidated financial statements for FY 1996. The Office of Civilian Health and Medical Program of the Uniformed Services (OCHAMPUS), part of the FY 1995...12.3 billion Defense Health Program, is one of the entities that DoD will include in its FY 1996 consolidated financial statements . The OCHAMPUS
ERIC Educational Resources Information Center
Alliance for Excellent Education, 2006
2006-01-01
This document presents a chart titled "Selected Federal Education Programs That Can Help Middle and High School Students Get an Excellent Education." It divides into five columns: (1) "No Child Left Behind" Programs (and Other Reauthorizations); (2) FY 2006 Final Appropriation; (3) FY 2007 Bush Budget; (4) FY 2007 House…
48 CFR 19.705-7 - Liquidated damages.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-7 Liquidated damages. (a) Maximum practicable utilization of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business and women-owned...
48 CFR 19.705-7 - Liquidated damages.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-7 Liquidated damages. (a) Maximum practicable utilization of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business and women-owned...
48 CFR 19.705-7 - Liquidated damages.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-7 Liquidated damages. (a) Maximum practicable utilization of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business and women-owned...
48 CFR 19.705-7 - Liquidated damages.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-7 Liquidated damages. (a) Maximum practicable utilization of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business and women-owned...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... DSH expenditures (mental health facility plus inpatient hospital) applicable to the FY 1995 DSH...
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1991-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less
Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration. Division of Fish and Wildlife.
1988-11-01
The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-22
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2009 HOPE VI Main Street Grants Program... posted its HOPE VI Main Street Grants program NOFA for FY2009 (``NOFA''). The NOFA makes available approximately $4 million in assistance for the HOPE VI Main Street Grants program, which was funded through the...
48 CFR 1819.7205 - Mentor-protégé agreements.
Code of Federal Regulations, 2014 CFR
2014-10-01
...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7205 Mentor... agreement as a condition for award of a contract by the mentor, including a subcontract under a NASA...
48 CFR 1819.7205 - Mentor-protégé agreements.
Code of Federal Regulations, 2012 CFR
2012-10-01
...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7205 Mentor... agreement as a condition for award of a contract by the mentor, including a subcontract under a NASA...
48 CFR 1819.7205 - Mentor-protégé agreements.
Code of Federal Regulations, 2011 CFR
2011-10-01
...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7205 Mentor... agreement as a condition for award of a contract by the mentor, including a subcontract under a NASA...
48 CFR 1819.7205 - Mentor-protégé agreements.
Code of Federal Regulations, 2013 CFR
2013-10-01
...://www.osbp.nasa.gov. ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7205 Mentor... agreement as a condition for award of a contract by the mentor, including a subcontract under a NASA...
Ettner, Susan L; Johnson, Steven
2003-01-01
The adequacy of risk adjustment to eliminate incentives for managed care organizations (MCOs) to avoid enrolling costly patients had been questioned. This study explored systematic differences in expenditures between beneficiaries with and without substance disorders assigned to the same capitation rate group under the Maryland Medicaid HealthChoice program. The investigators used fiscal year (FY) 1995 to 1997 Medicaid data to assign beneficiaries to rate cells based on FY 1995 diagnoses and compared the distribution of expenditures for beneficiaries with and without substance disorders, defined using FY 1997 and FY 1995 diagnoses. Results showed that differences in FY 1997 expenditures between beneficiaries with and without FY 1995 substance disorders were negligible. However, MCOs could expect greater average losses and lower average profits on beneficiaries with FY 1997 substance disorders. Thus, the adjusted clinical groups methodology used to adjust capitation payments in the HealthChoice program attenuated, but did not eliminate, financial incentives for MCOs to avoid substance abusers.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation of Comprehensive... Program for Negotiation of Comprehensive Small Business Subcontracting Plans. DATES: Effective Date... Fiscal Year 2012, (Pub. L. 112-81). Section 866 amends the DoD Test Program for Negotiation of...
10 CFR 784.6 - National security considerations for waiver of certain sensitive inventions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... or under any Government contract or subcontract of the Naval Nuclear Propulsion Program or the nuclear weapons programs or other atomic energy defense activities of the Department of Energy, a...) under the Naval Nuclear Propulsion Program or the nuclear weapons programs or other atomic energy...
10 CFR 784.6 - National security considerations for waiver of certain sensitive inventions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... or under any Government contract or subcontract of the Naval Nuclear Propulsion Program or the nuclear weapons programs or other atomic energy defense activities of the Department of Energy, a...) under the Naval Nuclear Propulsion Program or the nuclear weapons programs or other atomic energy...
Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Will
2006-09-01
The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Appel, Gordon John
Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.
48 CFR 819.7114 - Measurement of program success.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7114 Measurement of program success. The overall success of the VA Mentor-Protégé Program encompassing all participating mentors and... subcontract awards to protégé firms since the time of their entry into the program attributable to the mentor...
The America Supports You Program
2008-12-12
Federal Acquisition Regulation Part 31 and appropriation laws. (finding C). The American Forces Information Service, working under the authority...adequacy of program funding in the FY 2007-2009 [sic] as submitted in the American Forces Information Service budget estimate submission. The ASD (PA) in...From FY 2005 through FY 2007, the ASY program received $9.2 million of appropriated funds from American Forces Information Service (AFIS) and from the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2007-03-01
This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).
Projects #OPE-FY14-0004, OPE-FY14-0005 and OPE-FY14-0006, October 30, 2013. The EPA OIG plans to begin preliminary research on October 30, 2013 into the environmental programs the US Virgin Islands (USVI) has implemented on EPA’s behalf.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-05
... of accredited institutions of higher education for FY 2010 University Center Economic Development..., preparing American regions for growth and success in the worldwide economy. Institutions of higher education... of higher education. For FY 2010, the University Center Economic Development Program competition is...
48 CFR 3019.708-70 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.708-70 Solicitation provision and contract clauses. (a) The contracting officer shall insert the clause at (HSAR) 48 CFR 3052.219-70, Small Business...
48 CFR 219.702 - Statutory requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 219.702 Statutory requirements. (1) Section 834 of Public Law 101-189, as amended (15 U.S.C. 637... on a corporate, division, or plant-wide basis will reduce administrative burdens while enhancing...
NASA Technical Reports Server (NTRS)
Bales, K. S.
1984-01-01
The Objectives, Expected Results, Approach, and Fiscal Year FY 1984 Milestones for the Structures and Dynamics Division's research programs are examined. The FY 1983 Accomplishments are presented where applicable.
Space Transportation Propulsion Systems
NASA Technical Reports Server (NTRS)
Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl
2001-01-01
This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-23
...For 60-month projects funded in fiscal year (FY) 2007 under the Tribally Controlled Postsecondary Career and Technical Institutions Program (TCPCTIP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order to extend the project period of these current TCPCTIP grantees through FY 2013, or longer, if Congress continues to appropriate funds under the existing TCPCTIP program authority. This action will enable the two current TCPCTIP grantees to seek continuation awards in FY 2012 for their current projects, and we will not announce a new TCPCTIP competition in FY 2012.
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2017-03-21
the 75th and 76th ships in the class. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (in annual quantities of 3-1-2-2-2) are being...procured under the 10- ship MYP contract for FY2013-FY2017. The Navy, in its budget submission, notes this additional $1 billion in funding for the DDG...two DDG-51s requested for procurement in FY2017 at $3,393.9 million. The ships have received a total of $182.6 million in prior-year advance procurement
Materials science on parabolic aircraft: The FY 1987-1989 KC-135 microgravity test program
NASA Technical Reports Server (NTRS)
Curreri, Peter A. (Editor)
1993-01-01
This document covers research results from the KC-135 Materials Science Program managed by MSFC for the period FY87 through FY89. It follows the previous NASA Technical Memorandum for FY84-86 published in August 1988. This volume contains over 30 reports grouped into eight subject areas covering acceleration levels, space flight hardware, transport and interfacial studies, thermodynamics, containerless processing, welding, melt/crucible interactions, and directional solidification. The KC-135 materials science experiments during FY87-89 accomplished direct science, preparation for space flight experiments, and justification for new experiments in orbit.
48 CFR 519.7005 - Measurement of program success.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7005 Measurement of program success. The overall success of the GSA Mentor-Protégé Program encompassing all participating mentors and..., and percentage of subcontracts awarded to protégés by mentor firms under GSA contracts since the date...
The Navy’s Environmental Program and Opportunities in the Southwest
2013-08-27
Achieve RIP for all High Priority IRP Sites FY14 •Achieve RC for 90% of IRP + MRP Sites FY18 •Achieve RC for 95% of IRP + MRP Sites FY21 9 NAVFAC Southwest...8/21/2013 ER,N IRP vs. MRP ($M) NAVFAC SW 0 10 20 30 40 50 60 70 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 4 4 7 7 7 43 54 42 51...50 57 58 58 51 18 15 11 9 MRP IRP 10 NAVFAC Southwest Southwest ER,N Requirements Overall CTC: $766M ~54% IRP; ~46% MRP IRP , $411 MRP
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Housing Counseling Training Program... requirements for HUD's Housing Counseling Training Program NOFA for FY2010. This year's Housing Counseling... improve and standardize the quality of counseling provided by housing counselors employed by...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Rural Innovation Fund Program... requirements for HUD's FY 2010 Rural Innovation Fund Program NOFA. Specifically, this NOFA announces the... Innovation grant funds, along with unobligated and unused funds remaining for the Rural Fund's predecessor...
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1990-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International Development (USAID) Mentor-Protégé Program 719.273-1 Purpose. The USAID Mentor-Protégé Program is designed to assist small business... capabilities to perform contracts and sub-contracts for USAID and other Federal agencies. The Mentor-Protégé...
48 CFR 819.7115 - Solicitation provisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS VA Mentor-Protégé Program 819.7115 Solicitation provisions. (a) Insert 852.219-71, VA Mentor-Protégé Program, in solicitations that include FAR clause 52.219-9, Small Business Subcontracting Plan. (b) Insert 852.219-72, Evaluation Factor for Participation in the VA Mentor...
48 CFR 19.707 - The Small Business Administration's role in carrying out the program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false The Small Business Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System...
48 CFR 519.7009 - Application process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7009 Application process. (a... 3695 to the GSA Mentor-Protégé Program Manager, at GSA Office of Small Business Utilization (E... active approved subcontracting plan (small business exempted) and the firm is eligible, as of the date of...
48 CFR 519.7009 - Application process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7009 Application process. (a... 3695 to the GSA Mentor-Protégé Program Manager, at GSA Office of Small Business Utilization (E... active approved subcontracting plan (small business exempted) and the firm is eligible, as of the date of...
48 CFR 519.7009 - Application process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7009 Application process. (a... 3695 to the GSA Mentor-Protégé Program Manager, at GSA Office of Small Business Utilization (E... active approved subcontracting plan (small business exempted) and the firm is eligible, as of the date of...
48 CFR 519.7009 - Application process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7009 Application process. (a... 3695 to the GSA Mentor-Protégé Program Manager, at GSA Office of Small Business Utilization (E... active approved subcontracting plan (small business exempted) and the firm is eligible, as of the date of...
Department of Defense Review of the Foreign Comparative Testing Program FY2005-FY2006
2007-04-01
Kingdom as a potential alternative to an ongoing domestic development program, which was failing to meet the size, weight , and cost objectives. The...Norway, Switzerland NAMMO, Oerlikon Contraves 0.50 USMC 40mm Training Cartridge MK281 Germany Nico Pyrotechnik 13.14 USMC High Rate-of-Fire .50 Cal...late FY 2003 and, although the system performed as advertised, it did not meet stringent weight requirements. In FY 2005, a down-sized version of
FTA multi-year research program plan (FY 2009 - FY 2013).
DOT National Transportation Integrated Search
2008-09-01
The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... Federal share) IMD and other mental health facility DSH expenditures applicable to the State's FY 1995 DSH... State's total computable DSH expenditures attributable to the FY 1995 DSH allotment for mental health... health DSH expenditures applicable to the State's FY 1995 DSH allotment by the total computable amount of...
48 CFR 719.272 - Small disadvantaged business policies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... business policies. 719.272 Section 719.272 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.272 Small disadvantaged business... subcontracting with small disadvantaged businesses and other disadvantaged enterprises based on provisions of the...
48 CFR 719.272 - Small disadvantaged business policies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... business policies. 719.272 Section 719.272 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.272 Small disadvantaged business... subcontracting with small disadvantaged businesses and other disadvantaged enterprises based on provisions of the...
48 CFR 3019.708 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clauses. 3019.708 Section 3019.708 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting...
48 CFR 719.272 - Small disadvantaged business policies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... business policies. 719.272 Section 719.272 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.272 Small disadvantaged business... subcontracting with small disadvantaged businesses and other disadvantaged enterprises based on provisions of the...
48 CFR 719.272 - Small disadvantaged business policies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... business policies. 719.272 Section 719.272 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.272 Small disadvantaged business... subcontracting with small disadvantaged businesses and other disadvantaged enterprises based on provisions of the...
48 CFR 1819.7202 - Eligibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7202 Eligibility. (a) Eligibility of Mentors: To be eligible to participate as a mentor, an entity must be— (1) A large prime... mentor even if they currently are not performing under a NASA contract with an approved subcontracting...
Apollo lunar orbital sciences program alpha and X-ray spectrometers
NASA Technical Reports Server (NTRS)
1972-01-01
The development of the alpha and X-ray spectrometers which were used on the Apollo 15 and 16 flights is discussed. Specific subjects presented are: (1) lunar program management, (2) scientific and technical approach, (3) major test programs, (4) reliability, quality assurance, and safety, and (5) subcontract management.
Mirando, M A
2007-03-01
The National Research Initiative (NRI) Competitive Grants Program is the USDA's major competitive grants program and is administered by the Cooperative State Research, Education, and Extension Service. The NRI was authorized by the US Congress in the 1990 Farm Bill at a funding level of $500 million; however, the maximal NRI appropriation was $181.17 million in fiscal year (FY) 2006. Across all programs, the NRI is mandated to use 40% of its funding to support mission-linked research. Since its inception in 1991, the NRI has funded competitive grants in the discipline of animal reproduction. Before 2004, the Animal Reproduction Program funded a broad range of projects encompassing almost every subdiscipline in reproductive biology of farm animals, including aquatic species important to the aquaculture industry and laboratory animals. During FY 2004, the NRI Animal Reproduction Program narrowed the focus of its funding priorities to 5 issue-based topics in an effort to make greater measurable improvements in a few high-impact areas over the next 10 years. Funding priorities were narrowed further in FY 2006 to 3 subdisciplines based, in part, on recommendations that emerged from a stakeholder workshop conducted by Cooperative State Research, Education, and Extension Service in August 2004. In FY 2003, Congress authorized expenditure of up to 20% of the funds appropriated to the NRI to support projects that integrate at least 2 of the 3 functions of research, education, and extension. In FY 2004, the Animal Reproduction Program included a funding priority for integrated projects focused primarily on infertility in dairy cattle. The program funded its first integrated project in FY 2005. During FY 2002, increased emphasis on justification for the use of model systems (e.g., laboratory animals and in vitro systems) was included in the NRI request for applications. In FY 2006, applications proposing to primarily utilize nonagricultural animal models were excluded from the program. Currently, all proposed studies must be thoroughly justified in terms of their relevance to US animal agriculture and to program priorities identified within the request for applications.
DOT National Transportation Integrated Search
1997-10-01
The FY 1998-2000 Statewide Transportation Improvement Program (STIP) is a three-year program of highway and transit projects developed to fulfill the requirements set forth in the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The ...
1992-01-01
dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... Availability for HUD's Fiscal Year (FY) 2010 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program; Technical Correction AGENCY: Office of Healthy Homes and Lead Hazard...://www.Grants.gov its Notice of Funding Availability (NOFA) for HUD's FY2010 Lead-Based Paint Hazard...
Federal Agency biodefense funding, FY2011-FY2012.
Franco, Crystal; Sell, Tara Kirk
2011-06-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2011. This article updates those figures with budgeted amounts for FY2012, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2012 federal budget for civilian biodefense totals $6.42 billion. Of that total, $5.78 billion (90%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $637.6 million (10%) is budgeted for programs that have objectives solely related to biodefense.
Federal agency biodefense funding, FY2013-FY2014.
Sell, Tara Kirk; Watson, Matthew
2013-09-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense.
Federal agency biodefense funding, FY2010-FY2011.
Franco, Crystal; Sell, Tara Kirk
2010-06-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through FY2010. This article updates those figures with budgeted amounts for FY2011, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple public health, healthcare, national security, and international security issues in addition to biodefense. The FY2011 federal budget for civilian biodefense totals $6.48 billion. Of that total, $5.90 billion (91%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $577.9 million (9%) is budgeted for programs that deal strictly with biodefense.
Federal Agency Biodefense Funding, FY2013-FY2014
Watson, Matthew
2013-01-01
Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series have analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through proposed funding for FY2013. This article updates those figures with budgeted amounts for FY2014, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, Commerce, Veterans Affairs, and State; the Environmental Protection Agency; and the National Science Foundation. This article also includes an updated assessment of the proportion of biodefense funding provided for programs that address multiple scientific, public health, healthcare, national security, and international security issues in addition to biodefense. The FY2014 federal budget for civilian biodefense totals $6.69 billion. Of that total, $5.86 billion (88%) is budgeted for programs that have both biodefense and nonbiodefense goals and applications, and $835 million (12%) is budgeted for programs that have objectives solely related to biodefense. PMID:23906009
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1992-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less
Institute for scientific computing research;fiscal year 1999 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keyes, D
2000-03-28
Large-scale scientific computation, and all of the disciplines that support it and help to validate it, have been placed at the focus of Lawrence Livermore National Laboratory by the Accelerated Strategic Computing Initiative (ASCI). The Laboratory operates the computer with the highest peak performance in the world and has undertaken some of the largest and most compute-intensive simulations ever performed. Computers at the architectural extremes, however, are notoriously difficult to use efficiently. Even such successes as the Laboratory's two Bell Prizes awarded in November 1999 only emphasize the need for much better ways of interacting with the results of large-scalemore » simulations. Advances in scientific computing research have, therefore, never been more vital to the core missions of the Laboratory than at present. Computational science is evolving so rapidly along every one of its research fronts that to remain on the leading edge, the Laboratory must engage researchers at many academic centers of excellence. In FY 1999, the Institute for Scientific Computing Research (ISCR) has expanded the Laboratory's bridge to the academic community in the form of collaborative subcontracts, visiting faculty, student internships, a workshop, and a very active seminar series. ISCR research participants are integrated almost seamlessly with the Laboratory's Center for Applied Scientific Computing (CASC), which, in turn, addresses computational challenges arising throughout the Laboratory. Administratively, the ISCR flourishes under the Laboratory's University Relations Program (URP). Together with the other four Institutes of the URP, it must navigate a course that allows the Laboratory to benefit from academic exchanges while preserving national security. Although FY 1999 brought more than its share of challenges to the operation of an academic-like research enterprise within the context of a national security laboratory, the results declare the challenges well met and well worth the continued effort. A change of administration for the ISCR occurred during FY 1999. Acting Director John Fitzgerald retired from LLNL in August after 35 years of service, including the last two at helm of the ISCR. David Keyes, who has been a regular visitor in conjunction with ASCI scalable algorithms research since October 1997, overlapped with John for three months and serves half-time as the new Acting Director.« less
NASA Information Resources Management Long Range Plan, FY 1994-1998
NASA Technical Reports Server (NTRS)
1993-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.
Next Generation Solvent (NGS): Development for Caustic-Side Solvent Extraction of Cesium
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moyer, Bruce A.; Birdwell, Jr, Joseph F.; Bonnesen, Peter V.
This report summarizes the FY 2010 and 2011 accomplishments at Oak Ridge National Laboratory (ORNL) in developing the Next Generation Caustic-Side Solvent Extraction (NG-CSSX) process, referred to commonly as the Next Generation Solvent (NGS), under funding from the U.S. Department of Energy, Office of Environmental Management (DOE-EM), Office of Technology Innovation and Development. The primary product of this effort is a process solvent and preliminary flowsheet capable of meeting a target decontamination factor (DF) of 40,000 for worst-case Savannah River Site (SRS) waste with a concentration factor of 15 or higher in the 18-stage equipment configuration of the SRS Modularmore » Caustic-Side Solvent Extraction Unit (MCU). In addition, the NG-CSSX process may be readily adapted for use in the SRS Salt Waste Processing Facility (SWPF) or in supplemental tank-waste treatment at Hanford upon appropriate solvent or flowsheet modifications. Efforts in FY 2010 focused on developing a solvent composition and process flowsheet for MCU implementation. In FY 2011 accomplishments at ORNL involved a wide array of chemical-development activities and testing up through single-stage hydraulic and mass-transfer tests in 5-cm centrifugal contactors. Under subcontract from ORNL, Argonne National Laboratory (ANL) designed a preliminary flowsheet using ORNL cesium distribution data, and Tennessee Technological University confirmed a chemical model for cesium distribution ratios (DCs) as a function of feed composition. Interlaboratory efforts were coordinated with complementary engineering tests carried out (and reported separately) by personnel at Savannah River National Laboratory (SRNL) and Savannah River Remediation (SRR) with helpful advice by Parsons Engineering and General Atomics on aspects of possible SWPF implementation.« less
Next Generation Solvent Development for Caustic-Side Solvent Extraction of Cesium
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moyer, Bruce A.; Birdwell, Joseph F.; Bonnesen, Peter V.
This report summarizes the FY 2010 and 2011 accomplishments at Oak Ridge National Laboratory (ORNL) in developing the Next Generation Caustic-Side Solvent Extraction (NG-CSSX) process, referred to commonly as the Next Generation Solvent (NGS), under funding from the U.S. Department of Energy, Office of Environmental Management (DOE-EM), Office of Technology Innovation and Development. The primary product of this effort is a process solvent and preliminary flowsheet capable of meeting a target decontamination factor (DF) of 40,000 for worst-case Savannah River Site (SRS) waste with a concentration factor of 15 or higher in the 18-stage equipment configuration of the SRS Modularmore » Caustic-Side Solvent Extraction Unit (MCU). In addition, the NG-CSSX process may be readily adapted for use in the SRS Salt Waste Processing Facility (SWPF) or in supplemental tank-waste treatment at Hanford upon appropriate solvent or flowsheet modifications. Efforts in FY 2010 focused on developing a solvent composition and process flowsheet for MCU implementation. In FY 2011 accomplishments at ORNL involved a wide array of chemical-development activities and testing up through single-stage hydraulic and mass-transfer tests in 5-cm centrifugal contactors. Under subcontract from ORNL, Argonne National Laboratory (ANL) designed a preliminary flowsheet using ORNL cesium distribution data, and Tennessee Technological University confirmed a chemical model for cesium distribution ratios (DCs) as a function of feed composition. Inter laboratory efforts were coordinated with complementary engineering tests carried out (and reported separately) by personnel at Savannah River National Laboratory (SRNL) and Savannah River Remediation (SRR) with helpful advice by Parsons Engineering and General Atomics on aspects of possible SWPF implementation.« less
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
25 CFR 39.1003 - Allotment exception for FY 1991.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROGRAM Administrative Cost Formula § 39.1003 Allotment exception for FY 1991. For FY 1991 only, the Director may reserve an amount equal to no more than one half of the funds received in FY 1990 by those... distributed in accordance with the formula in § 39.122. ...
FY11 Facility Assessment Study for Aeronautics Test Program
NASA Technical Reports Server (NTRS)
Loboda, John A.; Sydnor, George H.
2013-01-01
This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.
2016 Targeted AirShed Grant Program - Closed Announcement FY 2016
Targeted Air Shed Grant Program proposal for FY 2016. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.
2015 Targeted AirShed Grant Program Grant - Closed Announcement FY 2015
Targeted Air Shed Grant Program proposal for FY 2015. The overall goal of the program is to reduce air pollution in the Nation’s areas with the highest levels of ozone and PM2.5 ambient air concentrations.
ERIC Educational Resources Information Center
Bellamy, G. Thomas, Ed.
Presented are 11 reports resulting from applied research of the Specialized Training Program at the University of Oregon, a subcontract workshop for 15 severely and profoundly retarded adults which focuses on the areas of vocational potential and community program development. Entries include the following titles and authors: "Habilitation of the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walters, T.; Savage, S.; Brown, J.
At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.
76 FR 37174 - Capital Investment Program-New Starts and Small Starts Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Capital Investment Program--New Starts... apportionment of the FY 2011 Capital Investment (New Starts and Small Starts) program funds. The funds will be... FY 2011, $1,596,800,000 was appropriated for the Capital Investments Grant Account, which includes...
48 CFR 252.219-7004 - Small business subcontracting plan (test program).
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS..., Small Business Programs, Office of the Under Secretary of Defense (Acquisition, Technology, and... accomplishments, and percentages for each of the two designated industry categories. (d) The failure of the...
FY 2016 Annual Performance Report
Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.
FY 2017 Annual Performance Report (APR)
Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.
FY 2015 Annual Performance Report
Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.
Appendix F: FreedomCAR and Vehicle Technologies Program inputs for FY 2008 benefits estimates
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2009-01-18
Document summarizes the results of the benefits analysis of EERE’s programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and nine Research, Development, Demonstration, and Deployment (RD3) programs.
DOE Solar Energy Technologies Program FY 2005 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sutula, Raymond A.
The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the program for fiscal year 2005. In particular, the report describes R&D performed by the Program’s national laboratories and university and industry partners.
ERIC Educational Resources Information Center
Connecticut Department of Higher Education (NJ1), 2009
2009-01-01
This report explains that the General Fund budget: (1) calls for $1,565.4 million for the FY 2009-11 biennium, including $781.2 million in FY 2010 and $784.2 million in FY 2011; and (2) maintains the State's primary student financial aid programs at FY 2009 funding levels, with Connecticut Aid to Charter Oak funded at 80.0 percent of full funding…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... increase in the CPI-U for the prior FY (0.0 percent). Column F FY 2010 TC MAP Exp. Incl. DSH. This column... including DSH expenditures. Column G FY 2010 TC MAP Exp. Net of DSH. This column contains the amount of the States' actual FY 2010 total computable DSH expenditures. Column H FY 2010 TC MAP Exp. Net of DSH. This...
2009 DOE Vehicle Technologies Program Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2009-10-01
Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-14
... (FY) 2011; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies (IRS) Program; et al. AGENCY: Office of Postsecondary Education, Department of...; Undergraduate International Studies and Foreign Language (UISFL) Program; International Research and Studies...
48 CFR 719.273-3 - Incentives for prime contractor participation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International...) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), USAID is authorized to provide appropriate incentives to encourage subcontracting opportunities for small business consistent with the efficient and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
... contracts and subcontracts portfolio. 3. Provide a minimum of 20 hours of individual or group counseling... training programs, such as, business assessment, management training, counseling, technical assistance... information dissemination, small business counseling, and technical assistance with small businesses currently...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-03
... contracts and subcontracts portfolio. 3. Provide a minimum of 20 hours of individual or group counseling... programs, such as, business assessment, management training, counseling, technical assistance, marketing... dissemination, small business counseling, and technical assistance with small businesses currently doing...
48 CFR 519.7007 - Protégé firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7007 Protégé firms. (a) For selection as.../mentor assigns to the subcontract; and (3) Eligible (not listed in the “Excluded Parties List System”) for U.S. Government contracts and not excluded from the Mentor-Protégé Program under section 519.7014...
Program Oversight of Contractors on the Battlefield
2011-03-23
contractor to another. For example, under Blackwater Security Firm‟s contract for private security services in Iraq, the contract paid workers guarding...subcontracting relationship with Blackwater . 38 The Coalition Provisional Authority (CPA) provided less than adequate control for approximately $8.8...the Army‟s LOGCAP, the Navy ‟s Construction Capabilities Contract Program, and the Air Force‟s Contract Augmentation Program. These programs remain
75 FR 25913 - Alternative Transportation in Parks and Public Lands Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... Fiscal Year (FY) 2009 appropriations for the Paul S. Sarbanes Transit in Parks program (formally the... $464,027 will be added to available FY 2010 appropriations for the program. A total of 80 applicants... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...
NASA Technical Reports Server (NTRS)
Penaranda, Frank E.
1992-01-01
The topics are presented in viewgraph form and include the following: international comparison of R&D expenditures in 1989; NASA Technology Transfer Program; NASA Technology Utilization Program thrusts for FY 1992 and FY 1993; National Technology Transfer Network; and NTTC roles.
Nevada Test Site-Directed Research and Development, FY 2007 Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wil Lewis, editor
2008-02-20
The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving frommore » SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.« less
The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a Request for Proposals for applicants to provide the Chesapeake Bay Program partners with a proposal(s) for providing technical analysis and programmatic evaluation
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
...) Letter No. 13-10: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting...-10 entitled, FY 2011 State Initial Allocations and the Process for Requesting Additional TAA Program... INFORMATION: Fiscal Year (FY) 2011 State Initial Allocations and the Process for Requesting Additional Trade...
2017 TRIAD Small Business Advisory Panel
2017-10-11
government service in 2007 as the Science & Technology (S&T) Project Manager for the United States Navy’s Unmanned Maritime Systems Program Office...National Renewable Energy Laboratory (NREL) as a Program Manager for over 110 energy and water projects on military installations. He worked... management , project management , program management , donor relation service, contract and subcontract policy development and implementation, data integrity
Federal Funding for Health Security in FY2016.
Boddie, Crystal; Sell, Tara Kirk; Watson, Matthew
2015-01-01
This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa.
Federal Funding for Health Security in FY2016
Sell, Tara Kirk; Watson, Matthew
2015-01-01
This article assesses US government funding in 5 domains critical to strengthening health security: biodefense programs, radiological and nuclear programs, chemical programs, pandemic influenza and emerging infectious disease programs, and multiple-hazard and preparedness programs. This year's article also highlights the emergency funding appropriated in FY2015 to enable the international and domestic response to the Ebola outbreak in West Africa. PMID:26042863
2005-08-02
called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations
48 CFR 919.705-6 - Postaward responsibilities of the contracting officer.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 919.705-6 Postaward responsibilities of the... Small and Disadvantaged Business Utilization. [49 FR 11997, Mar. 28, 1984, as amended at 59 FR 9106, Feb...
High performance computing and communications: FY 1997 implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less
FY 2017 Grant Announcement: FY 2017 Source Reduction Assistance Grant Program
The EPA Region 10 Pollution Prevention Program is announcing a grant competition for Source Reduction Assistance (SRA) awards. EPA Region 10 anticipates awarding approximately $95,000 in federal grant funding to support SRA agreements.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-10
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5600-N-18-C-1] HUD's Fiscal Year (FY) 2012 Transformation Initiative: Natural Experiments Research Grant Program, Cancellation AGENCY: Office... Availability (NOFA) ``Transformation Initiative: Natural Experiments Grant Program'' on Grants.gov . The close...
The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a request for proposals (RFP) for supporting both the:1.Small Watershed Grants (SWG) program; and 2.Innovative Nutrient and Sediment Reduction (INSR) grants program.
2015 Fermilab Laboratory Directed Research & Development Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wester, W.
2016-05-26
The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less
ORNLs Laboratory Directed Research and Development Program FY 2009 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2010-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2009. The associated FY 2009 ORNL LDRD Self-Assessment (ORNL/PPA-2010/2) provides financial data andmore » an internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2014-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2013. The associated FY 2013 ORNL LDRD Self-Assessment (ORNL/PPA-2014/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2008 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2009-03-01
The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and anmore » internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2012 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2013-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2012. The associated FY 2012 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...
Code of Federal Regulations, 2011 CFR
2011-10-01
... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... which the apparently successful offeror received an evaluation credit for proposing one or more SDB... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
Microgravity science and applications. Program tasks and bibliography for FY 1994
NASA Technical Reports Server (NTRS)
1995-01-01
This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground-based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. ATD (Advanced Technology Development) program task descriptions are also included. The bibliography cites the related PI (Principal Investigator) publications and presentations for these program tasks in FY 1994. Three appendices include Table of Acronyms, Guest Investigator Index, and Principal Investigator Index.
Microgravity science & applications. Program tasks and bibliography for FY 1995
NASA Technical Reports Server (NTRS)
1996-01-01
This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. Advanced technology development (ATD) program task descriptions are also included. The bibliography cites the related principle investigator (PI) publications and presentations for these program tasks in FY 1994. Three appendices include a Table of Acronyms, a Guest Investigator index and a Principle Investigator index.
2008 Federal Energy Management Program (FEMP) Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tremper, C.
2009-07-01
This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.
2003-07-01
magnetorheological (MRF) finishing to reduce surface roughness in half the time of previous processes . Improved image quality directly supports improved...affordably polish the inside surface of small tight free form optics to a finish on the order of 3 angstroms. • Demonstrate cycle time reduction...processes and controls for steel, titanium, and superalloys. FY2007: • Demonstrate an improved superfine finishing for optical components to
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-23
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Reallotment of FY... of Fiscal Year (FY) 2011 funds may be available for re-allotment. After a 30-day comment period, this amount has not changed. This notice announces that $3,089,920 was reallotted on September 26, 2012 to FY...
Financial Summary Tables. Department of Defense Budget for Fiscal Year 1979
1978-01-01
79 Q FAD 740 - Object Classification Distribution of Direct and Reimbursable Obligations, FY 77, FY 78 and FY 79 .U 762 - FY 1979 Reimbursable Program...FAO-738/79 (FILE IN VOL. It JAN 23, 1978 PAGE 1 UOGET BALANCES REIMBURSABLE RECOVERIES TOTAL DIRECT OBLIGATIONS...m.---- .---- ...------.m.---- -..m.----.......---e e e ee-- - - - DIRECT OBLIGATIONS REIMBURSABLE TOTAL WRITEOFFS UNOBLIGATED UNOBLIGATED
Military needs and forecast, 2
NASA Technical Reports Server (NTRS)
Goldstayn, Alan B.
1986-01-01
FORECAST 2 has accomplished its objectives of identifying high leverage technologies for corporate Air Force review. Implementation is underway with emphasis on restructuring existing programs and programming resources in the FY88 BES/FY89 POM. Many joint service/agency opportunities exist.
2012 Wind Program Peer Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zayas, Jose; Higgins, Mark
2012-06-01
This report summarizes the proceedings of the 2012 Wind Program Peer Review, the goals of which were to review and evaluate the strategy and goals of the Wind Program; review and evaluate the progress and accomplishments of the program's projects funded in fiscal year (FY) 2010 and FY 2011; and foster interactions among the national laboratories, industry, and academic institutions conducting research and development on behalf of the program.
DOE Solar Energy Technologies Program FY 2005 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the U.S. Department of Energy Solar Energy Technologies Program for Fiscal Year 2005. In particular, the report describes R&D performed by the Program?s national laboratories (National Renewable Energy Laboratory, Sandia National Laboratories, Oak Ridge National Laboratory, and Brookhaven National Laboratory) and university and industry partners.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandwisch, D W
1995-11-01
This report describes work performed by Solar Cells, Inc. (SCI), under a 3-year subcontract to advance SCI`s PV manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. SCI will meet these objectives in three phases by designing, debugging, and operating a 20-MW/year, automated, continuous PV manufacturing line that produces 60-cm {times} 120-cm thin-film CdTe PV modules. This report describes tasks completed under Phase 1 of the US Department of Energy`s PV Manufacturing Technology program.
2005-06-01
The Office of Personnel Management (OPM) is issuing this final regulation to amend the Federal Employees Health Benefits Acquisition Regulation (FEHBAR). It establishes requirements, including audit, for Federal Employees Health Benefits Program (FEHB) experience-rated carriers' Large Provider Agreements. It also modifies the dollar threshold for review of carriers' subcontract agreements; revises the definitions of Cost or Pricing Data and Experience-rate to reflect mental health parity requirements; updates the contract records retention requirement; updates the FEHB Clause Matrix; and conforms subpart and paragraph references to Federal Acquisition Regulation (FAR) revisions made since we last updated the FEHBAR.
48 CFR 836.574 - Subcontracts and work coordination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracts and work... Subcontracts and work coordination. The contracting officer shall insert the clause at 852.236-80, Subcontracts and work coordination, in solicitations and contracts for construction expected to exceed the micro...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... DEPARTMENT OF EDUCATION [CFDA No. 84.215L] Office of Elementary and Secondary Education; Smaller Learning Communities Program; Notice Inviting Applications for New Awards Using Fiscal Year (FY) 2009 Funds... applications for new awards using fiscal year (FY) 2009 funds for the Smaller Learning Communities Program...
FY2015 Analysis of the Teamwork USA Program. Memorandum
ERIC Educational Resources Information Center
Howard, Mark
2015-01-01
The Department of Research and Evaluation (DRE) has completed an analysis of the performance of students who participated in the Teamwork USA Program, administered in FY2014 at three District schools. Teamwork USA hopes to improve student achievement at select Title I elementary schools via its Instrumental Music Program grant. This memorandum to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anita Gianotto; Dena Tomchak
As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.
State Training & Employment Program. Program Review for FY99-FY01.
ERIC Educational Resources Information Center
Cordova, Lorraine
Alaska's State Training and Employment Program (STEP) was designed with the primary objective of reducing current and future claims against Unemployment Insurance (UI) benefits by providing training to those who are unemployed or facing unemployment. STEP is also charged with fostering growth of existing businesses and attracting new businesses to…
Annual Defense Department Report FY 1973
1972-02-22
program of combatting Sickle- Cell Anemia. Finally, as we approach an all-volunteer force we will continually assess our recruiting and retention programs...GNP devoted to Defense continues to decline -- from 7.0% in FY 1972 to 6.4% in FY 1973. This is a 22 year low. 59 We also are requesting a suplemental ...complement Total Force Planning. Some of these initiatives will fall in areas where the U.S. bears the primary responsibility, while others stem from
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).
Code of Federal Regulations, 2012 CFR
2012-01-01
... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).
Code of Federal Regulations, 2013 CFR
2013-01-01
... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...
48 CFR 212.7002-2 - Subcontracts under the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-2... production of an item or process begun as a prototype project under an other transaction agreement or as a...
FY 1998 Proposed Rail Improvement Program Supplement Update - Bloomington II
DOT National Transportation Integrated Search
1997-07-01
The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement : is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning track rehabilitation and new track co...
FY 1998 Proposed Rail Improvement Program Supplement Update - Pontiac
DOT National Transportation Integrated Search
1997-07-01
The purpose of this amendment to the FY 1998 Rail Improvement Program Supplement is to present an analysis which has been formulated, using prescribed methodology, to assist in an investment decision concerning new track construction at the Prairie C...
FY 2018 Grant Announcement: FY2018 Support for Geospatial Analysis Support
The U.S. Environmental Protection Agency’s (EPA) Chesapeake Bay Program Office (CBPO) is announcing a Request for Proposals (RFP) for applicants to provide the Chesapeake Bay Program (CBP) partners with a proposal for providing geospatial analysis support
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...
48 CFR 1052.219-71 - Subcontracting Plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services. >
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Subcontracting for nuclear... Clauses 952.225-70 Subcontracting for nuclear hot cell services.> As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...
FY2013 Defense Budget Request: Overview and Context
2012-04-20
Prescribed by ANSI Std Z39-18 FY2013 Defense Budget Request: Overview and Context Congressional Research Service Summary This report analyzes ...Congressional action on the FY2013 defense budget will be analyzed in a separate report. The FY2013 Department of Defense (DOD) budget request...defense-related nuclear programs conducted by the Department of Energy , and other activities. For discretionary DOD budget authority, the request includes
NASA's Microgravity Research Program
NASA Technical Reports Server (NTRS)
Woodard, Dan
1998-01-01
This fiscal year (FY) 1997 annual report describes key elements of the NASA Microgravity Research Program (MRP) as conducted by the Microgravity Research Division (MRD) within NASA's Office of Life and Microgravity, Sciences and Applications. The program's goals, approach taken to achieve those goals, and program resources are summarized. All snapshots of the program's status at the end of FY 1997 and a review of highlights and progress in grounds and flights based research are provided. Also described are major space missions that flew during FY 1997, plans for utilization of the research potential of the International Space Station, the Advanced Technology Development (ATD) Program, and various educational/outreach activities. The MRP supports investigators from academia, industry, and government research communities needing a space environment to study phenomena directly or indirectly affected by gravity.
IOWA STATE MANPOWER DEVELOPMENT COUNCIL. TWELFTH PROGRESS REPORT, MARCH 1, APRIL 30, 1967.
ERIC Educational Resources Information Center
Office of Manpower Policy, Evaluation, and Research (DOL), Washington, DC.
THE COUNCIL NEGOTIATED SEVERAL ON-THE-JOB TRAINING SUBCONTRACTS FOR PLACEMENTS, INITIATED 4 COUPLED ON-THE-JOB TRAINING-VOCATIONAL EDUCATION PROGRAMS, ACQUIRED ADDITIONAL FUNDS TO ENLARGE BOTH PROJECTS, AND WAS INVOLVED IN A CONTROVERSY OVER THE TRAINING OF BRICKLAYERS UNDER A MANPOWER DEVELOPMENT TRAINING ACT-APPROVED PROGRAM. REPRODUCTIONS OF…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... Competition Throughout the Life Cycle of Major Defense Acquisition Programs AGENCY: Defense Acquisition... subcontract level of the MDAP throughout its life cycle as a means to improve contractor performance; and (2...) throughout the program life cycle as a means to improve contractor performance; and (ii) Document the...
Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-05-01
This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ames, J.; Werner, C.
2003-08-01
Final report on subcontract for holding two briefings for policymakers and the environmental community on environmental issues related to biofuels; one on one on the energy and environmental issues associated with biofuels production and use, and the other on implications of pending renewable fuels standard legislation.
U.S. Department of Transportation : FY 1998 budget in brief
DOT National Transportation Integrated Search
1998-01-01
The fiscal year (FY) 1998 budget request for DOT makes a down payment on meeting the : transportation challenges of the 21st century. A total of $38.4 billion is proposed to support : transportation programs in FY 1998. This is approximately one perc...
2013-08-07
This final rule updates the hospice payment rates and the wage index for fiscal year (FY) 2014, and continues the phase out of the wage index budget neutrality adjustment factor (BNAF). Including the FY 2014 15 percent BNAF reduction, the total 5 year cumulative BNAF reduction in FY 2014 will be 70 percent. The BNAF phase-out will continue with successive 15 percent reductions in FY 2015 and FY 2016. This final rule also clarifies how hospices are to report diagnoses on hospice claims, and provides updates to the public on hospice payment reform. Additionally, this final rule changes the requirements for the hospice quality reporting program by discontinuing currently reported measures and implementing a Hospice Item Set with seven National Quality Forum (NFQ) endorsed measures beginning July 1, 2014, as proposed. Finally, this final rule will implement the hospice Experience of Care Survey on January 1, 2015, as proposed.
Scout launch vehicle, phases 4 and 5
NASA Technical Reports Server (NTRS)
Mccracken, D. C.; Leiss, A.; Horrocks, E. R.; Turpen, N. H.
1974-01-01
The historical data of the Scout launch vehicle program for Phases IV and V (vehicles 138 through 177) is presented for the FY 1966 through FY 1971 time period. Technical data and accounting information are detailed to provide a total picture of the program.
ARIES Oxide Production Program Annual Report - FY14
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelley, Evelyn A.; Dinehart, Steven Mark
A summary of the major accomplishments (September), milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program at the close of FY14 is presented in this Executive Summary. Annual accomplishments are summarized in the body of the report.
Notification: Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program
Project #OPE-FY12-0017, September 17, 2012. We have completed the preliminary research portion ofour evaluation, Hotline Complaint Regarding the EPA Region 4 Environmental Justice Program (OPE FY12-0017) and will now continue into the fieldwork phase.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 3 2010-10-01 2010-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 3 2013-10-01 2013-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 3 2011-10-01 2011-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 3 2014-10-01 2014-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...
FY2017 Defense Appropriations Fact Sheet: Selected Highlights of H.R. 5293 and S. 3000
2016-06-17
legally binding caps on discretionary spending for defense programs and for non-defense programs, which were established by P.L. 114-74, the Bipartisan...funding for FY2017 that (1) exceeds the relevant BBA cap ; and (2) is also exempt from that spending cap because it is classified as funding for so-called...Overseas Contingency Operations (OCO). The 2015 BBA increased binding caps on defense and non-defense discretionary appropriations for FY2016 and
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-15
...In accordance with section 102(a)(4)(C) of the Department of Housing and Urban Development Reform Act of 1989, this announcement notifies the public of past funding decisions made by the Department in a competition for funding under the FY2011 Notice of Funding Availability (NOFAs) for the Homeless Assistance Grants program. This announcement contains the names of the awardees and the amounts of the awards made available by HUD in FY2011.
2007-06-12
up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The
Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress
2007-10-25
production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and
Program Direction FY 2017 Budget At-A-Glance
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-03-01
Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.
EVALUATION TECHNIQUES AND TOOL DEVELOPMENT FOR FY 08 CMAQ RELEASE
In this task, research efforts are outlined that relate to the AMD Model Evaluation Program element and support CMAQ releases within the FY05-FY08 time period. Model evaluation serves dual purposes; evaluation is necessary to characterize the accuracy of model predictions, and e...
2016-01-22
In accordance with court rulings in cases that challenge the federal fiscal year (FY) 2004 outlier fixed-loss threshold rulemaking, this document provides further explanation of certain methodological choices made in the FY 2004 fixed-loss threshold determination.
The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY 2002 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the Committee on Environment and Natural Reso...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... Program. This announcement contains the consolidated names and addresses of the award recipients under... Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012 AGENCY: Office of the Assistant Secretary for Public and Indian Housing, HUD. ACTION: Announcement of funding awards. SUMMARY: In accordance...
Management of optics. [for HEAO-2 X ray telescope
NASA Technical Reports Server (NTRS)
Kirchner, T. E.; Russell, M.
1981-01-01
American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
San Diego transit five year plan update : FY 1982-1986
DOT National Transportation Integrated Search
1981-07-01
The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...
INDOT Research Program Benefit Cost Analysis—Return on Investment for Projects Completed in FY 2016
DOT National Transportation Integrated Search
2017-12-01
The Governors Office requested an annual financial analysis of the INDOT Research Program to determine the return on the research investment (ROI). The current financial analysis is for research projects that completed in FY 2016. Analyses on prev...
2014-08-13
Small Business Category FY 2012 Navy Target Percentage FY 2013 Navy Target Percentage Small Business 15.75% 18.00% SDB 5.00% 5.50...9 FY 2013 Achievement Small Business Category FY 13 Target FY 13 Achievement % Difference Small Business 18.00% 29.93% +11.93% SDB 5.50...709,508,809 18.00% 29.93% SDB 704 $351,083,260 5.50% 14.81% VOSB * 462 $130,028,497 0.00% 5.49% SDVOSB 267 $87,214,636 2.00% 3.68% WOSB 327
Development Achievements for Fiscal 1990.
ERIC Educational Resources Information Center
Smoot, Joseph G.
This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoekstra, Robert J.; Hammond, Simon David; Richards, David
2017-09-01
This milestone is a tri-lab deliverable supporting ongoing Co-Design efforts impacting applications in the Integrated Codes (IC) program element Advanced Technology Development and Mitigation (ATDM) program element. In FY14, the trilabs looked at porting proxy application to technologies of interest for ATS procurements. In FY15, a milestone was completed evaluating proxy applications in multiple programming models and in FY16, a milestone was completed focusing on the migration of lessons learned back into production code development. This year, the co-design milestone focuses on extracting the knowledge gained and/or code revisions back into production applications.
2017-08-04
This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2018. Additionally, this rule includes new quality measures and provides an update on the hospice quality reporting program.
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
46 CFR Sec. 15 - Subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2144.102 Section... LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES General 2144.102 Policy. For all FEGLI Program contracts, the Contracting Officer's advance...
48 CFR 370.202 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 370.202 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES HHS SUPPLEMENTATIONS SPECIAL PROGRAMS AFFECTING ACQUISITION Indian Preference in Employment, Training, and Subcontracting... with Indian organizations; or (2) The work to be performed is specifically for the benefit of Indians...
48 CFR 370.205 - Tribal preference requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requirements. 370.205 Section 370.205 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES HHS SUPPLEMENTATIONS SPECIAL PROGRAMS AFFECTING ACQUISITION Indian Preference in Employment, Training, and Subcontracting Opportunities 370.205 Tribal preference requirements. (a) When the contractor will perform work...
48 CFR 1419.705-6 - Postaward responsibilities of the contracting officer.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontracting program. Reviews shall be conducted as required based on problems perceived such as insufficient... format shown at 1453.303-70. At the discretion of the CO, the BUDS may conduct the reviews. In addition...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... Life Cycle of Major Defense Acquisition Programs (DFARS Case 2009-D014) AGENCY: Defense Acquisition... competition at both the prime contract and subcontract level of the MDAP throughout its life cycle as a means...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Defense Procurement and Acquisition Policy (Contract Policy and International Contracting), ((703) 697... DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Other International Agreements and Coordination 225.872... for reciprocal “no-cost” audits of contracts and subcontracts (pre- and post-award). (b) To determine...
LBNL Laboratory Directed Research and Development Program FY2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, D.
2017-03-01
The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.
Logistics Modernization Program System Procure-to-Pay Process Did Not Correct Material Weaknesses
2012-05-29
Prevalidation of DOD Commercial Payments,” March 2, 2007 Army U.S. Army Audit Agency Report No. A-2007-0205- FFM , “Logistics Modernization Program...Report No. A-2007-0163- FFM , “FY 03–FY 05 Obligations Recorded in the Logistics Modernization Program,” July 27, 2007 U.S. Army Audit Agency Report No
Military Construction and Family Housing Program. Fiscal Year (FY) 2001 Budget Estimates
2000-02-01
Department of the Air Force Military Construction and Family Housing Program Fiscal Year (FY) 2001 Budget Estimates Justification Data...Department of the Air Force Military Construction and Military Family Housing Program Summary Fiscal Year 2001 Appropriation Authorization Request... FISCAL YEAR 2001 (DOLLARS IN THOUSANDS) STATE/COUNTRY INSTALLATION TITLE APPROP REQUEST AUTH REQUEST PAGE INSIDE THE U.S. ALABAMA
ERIC Educational Resources Information Center
National Center for Educational Research and Development (DHEW/OE), Washington, DC.
In 1970 the National Center for Educational Research and Development (CER) reviewed United States Office of Education (USOE) Bureau of Research policies over the previous 15 years, and as a result of this review, initiated the Directed Research Program. This program will concentrate funds in four areas of high educational significance and will be…
Finney, John W; Amundson, Erin O; Bi, Xiaoyu; Cucciare, Michael A; Eisen, Seth A; Finlay, Andrea K; Halvorson, Max A; Hayashi, Ko; Owens, Douglas K; Maisel, Natalya C; Timko, Christine; Weitlauf, Julie C; Cronkite, Ruth C
2016-04-01
To evaluate the academic advancement and productivity of Department of Veterans Affairs Health Services Research and Development (HSR&D) Career Development Award (CDA) program recipients, National Institutes of Health (NIH) K awardees in health services research (HSR), and Agency for Healthcare Research and Quality (AHRQ) K awardees. In all, 219 HSR&D CDA recipients from fiscal year (FY) 1991 through FY2010; 154 NIH K01, K08, and K23 awardees FY1991-FY2010; and 69 AHRQ K01 and K08 awardees FY2000-FY2010 were included. Most data were obtained from curricula vitae. Academic advancement, publications, grants, recognition, and mentoring were compared after adjusting for years since award, and personal characteristics, training, and productivity prior to the award. No significant differences emerged in covariate-adjusted tenure-track academic rank, number of grants as primary investigator (PI), major journal articles as first/sole author, Hirsch h-index scores, likelihood of a journal editorship position or membership in a major granting review panel, or mentoring postgraduate researchers between the HSR&D CDA and NIH K awardees from FY1991-FY2010, or among the three groups of awardees from FY2000 or later. Among those who reported grant funding levels, HSR&D CDAs from FY1991-2010 had been PI on more grants of $100,000 than NIH K awardees. HSR&D CDAs had a higher mean number of major journal articles than NIH K awardees from FY1991-2010. Findings show that all three HSR career development programs are successfully selecting and mentoring awardees, ensuring additional HSR capacity to improve the quality and delivery of high-value care.
78 FR 28895 - Susan Harwood Training Grant Program, FY 2013
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... Program, FY 2013 AGENCY: Occupational Safety and Health Administration (OSHA), Labor. ACTION: Notice of... Thursday, June 13, 2013, the application deadline date. ADDRESSES: The complete Susan Harwood Training... Order No. 1-2012 (77 FR 3912). Signed at Washington, DC, on May 13, 2013. David Michaels, Assistant...
75 FR 30908 - Notice of Funds Availability for FY 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... for the FY 2010 funding round of the Financial Education and Counseling (FEC) Pilot Program... Counseling Services to Prospective Homebuyers. The goals of grants that are awarded through the FEC Pilot Program are to identify successful methods of Financial Education and Counseling Services that result in...
75 FR 75666 - Advanced Placement (AP) Test Fee Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-06
... DEPARTMENT OF EDUCATION [CFDA No. 84.330B] Advanced Placement (AP) Test Fee Program AGENCY: Office... AP Test Fee fiscal year (FY) 2011 competition. SUMMARY: On September 1, 2010, we published in the Federal Register (75 FR 53681) a notice inviting applications for the AP Test Fee FY 2011 competition...
Fiscal Year 2007 Program Performance Plan
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…
76 FR 5244 - Alternative Transportation in Parks and Public Lands Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... Fiscal Year (FY) 2010 appropriations and previously unallocated prior year funds, for the Paul S... reserved for oversight activities, and $46,591 will be added to available FY 2011 appropriations for the... collaborative process. The goals of the program are to conserve natural, historical, and cultural resources...
DOT National Transportation Integrated Search
1998-02-01
This report is the fifth annual national review of activities funded under the : Congestion Mitigation and Air Quality Improvement (CMAQ) Program, covering : fiscal year (FY) 1996. It covers the distribution of funding among project : categories, an ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... DEPARTMENT OF EDUCATION Application Deadline for Fiscal Year (FY) 2012; Small, Rural School... for submission of fiscal year (FY) 2012 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES: Application...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
...: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Housing Counseling Grant Program AGENCY... requirements for the FY2010 Housing Counseling Grant NOFA. Approximately $79 million is made available through...), to support the delivery of a wide variety of housing counseling services to homebuyers, homeowners...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Asthma Interventions in Public and..., funding criteria, and other requirements for the FY2010 Asthma Interventions in Public and Assisted... (CFDA) number for Asthma Interventions in Public and Assisted Multifamily Housing Grant Program is 14...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... Interventions in Public and Assisted Multifamily Housing Program AGENCY: Office of Healthy Homes and Lead Hazard... Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted... Availability (NOFA) for the Fiscal Year (FY) 2011 Asthma Interventions in Public and Assisted Multifamily...
1990-01-01
effective ways of promoting U.S. interests. Finally, our Denton Amendment space-available transportation program continues assisting generous American hu... Eglin AFB, FL 9th SOS, Eglin AFB, FL 55th SOS, Eglin AFB, FL 1724th Special Tactics Squadron, Pope AFB, NC 67th SOS, RAF Woodbridge, UK 21st SOS...almost all of which were built from 1962 to 1966 - faced block obsolescence within a decade, and their missiles would not be effective against hardened
1981-01-01
the Position Location Reporting System/Joint Tactical Information Distributlo:; System Hybrid (ADDS) was approved by the Combat and Materiel Developers...Programs program. The establishment of a hybrid testbed will be Initiated in FY 1981 integrating the engint-ciag development models of Position...ad anticipated. 0.110 - This project was Increased by $1999 thousand in FT 1980 to support additional AD work on the hybrid collective protec- tion
1987-01-01
enough to sustain one wartime station overseas as well as satisfy training and maintenance needs. Advanced TacticalAir Reconnaissance System ( ATARS ...The ATARS is an umbrella concept for a series of upgrades in tactical reconnaissance capabilities. Major elements of the program include the Tactical...Funding Funding Funding E-3A Modifkation Development: $ Millions 105.2 96.8 110.7 88.4 Procurement: Quantity - - - - $ Millions .9 33.5 27.7 40.7 ATARS
48 CFR 30.607 - Subcontract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...
NASA Microgravity Science and Applications Program
NASA Technical Reports Server (NTRS)
1992-01-01
Key elements of the microgravity research program as conducted by the Microgravity Science and Applications Division (MSAD) within the Office of Space Science and Applications (OSSA) during fiscal year (FY) 1992 are described. This NASA funded program supported investigators from the university, industry, and government research communities. The program's goals, the approach taken to achieve those goals, and the resources that were available are summarized. It provides a 'snapshot' of the Program's status at the end of FY 1992 and reviews highlights and progress in the ground and flight-based research during the year. It also describes four major space missions that flew during FY 1992, the advanced technology development (ATD) activities, and the plans to use the research potential of Space Station Freedom and other advanced carriers. The MSAD program structure encompassed five research areas: (1) Biotechnology, (2) Combustion Science, (3) Fluid Physics, (4) Materials Science, and (5) Benchmark Physics.
The Defense Airborne Reconnaissance Office Unmanned Aerial Vehicle (UAV) Annual Report FY 1996.
1996-11-06
i>’ ’" UAV Annual Report FY1996 6 November 1996 L DEFENSE MRBOBNEiSCONNAGSAHCEC UAVANNUAL REPORT OUR SECOND UNMANNED AERIAL VEHICLE (UAV...ANNUAL REPORT provides an overview of the Defense Department’s UAV program activities for fiscal year (FY) 1996 . The Defense Airborne Reconnaissance...significant accomplishments that UAVs have achieved this past year, FY 1996 . Simply stated, UAVs are moving from words to deeds. They are being recognized in
Tactical Aircraft Modernization: Issues for Congress
2007-06-08
Investigations into the V-22 program, its crashes, and allegations of malfeasance came to a head in the spring of 2001. On May 1, 2001, a Blue...procurement of all weapons through FY2003 and would rise to 16% through FY2009 and 18% through FY2015. Representative Curt Weldon stated that since...the FY2000 defense budget. In the spring of 2003 F-22 affordability was again at issue. During an April 11 hearing of the House Government Reform
48 CFR 22.603 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act 22.603 Applicability. The requirements in 22.602 apply to contracts (including for this purpose, indefinite-delivery contracts, basic ordering agreements, and blanket purchase agreements) and subcontracts under Section 8(a...
48 CFR 419.201 - General policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SMALL BUSINESS PROGRAMS Policies 419.201 General policy. It is the policy of USDA to provide maximum practicable contracting and subcontracting opportunities to small business (SB), small disadvantaged business (SDB), HUBZone small business, women-owned business (WOB), veteran-owned small business (VOSB), and...
48 CFR 1419.201 - General policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SMALL BUSINESS PROGRAMS Policies 1419.201 General policy. HCAs, without the power of redelegation, shall... participation of small business and small disadvantaged businesses in contract and subcontract opportunities. Goals for contract awards to minority business enterprises and women-owned businesses shall also be...
48 CFR 1419.201 - General policy.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SMALL BUSINESS PROGRAMS Policies 1419.201 General policy. HCAs, without the power of redelegation, shall... participation of small business and small disadvantaged businesses in contract and subcontract opportunities. Goals for contract awards to minority business enterprises and women-owned businesses shall also be...
Computer Science Research Funding: How Much Is Too Little?
2009-06-01
Bioinformatics Parallel computing Computational biology Principles of programming Computational neuroscience Real-time and embedded systems Scientific...National Security Agency ( NSA ) • Missile Defense Agency (MDA) and others The various research programs have been coordinated through the DDR&E...DOD funding included only DARPA and OSD programs. FY07 and FY08 PBR funding included DARPA, NSA , some of the Services’ basic and applied research
Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.
, administration, and placement of subcontracts for both centers, ensuring that the objectives are met and that the develop budgets for subcontracts and makes sure the subcontracts are properly initiated and closed out in
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cartmell, D.B.
1995-09-01
Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less
Proposed U.S. Space Weather Budget for Fiscal Year 2011 Would Fund Key Programs
NASA Astrophysics Data System (ADS)
Showstack, Randy
2010-09-01
The proposed U.S. federal budget for space weather research for fiscal year (FY) 2011 would provide funding for key space weather programs within several U.S. agencies, including NASA, NOAA, the National Science Foundation (NSF), and the Air Force. Funding for the programs comes ahead of the upcoming solar maximum, a period of the solar cycle with heightened solar activity, projected for 2013. Several officials indicated that while funding is not tied to a particular solar maximum or minimum, available assets could help with studying and preparing for the solar maximum. The proposed FY 2011 budget for the Heliophysics Division within NASA's Science Mission Directorate is $641.9 million, compared with the FY 2010 enacted budget of $627.4 million. Within the proposed budget is $166.9 million for heliophysics research, down slightly from $173 million for FY 2010. The proposed budget would include $31.7 million for heliophysics research and analysis (compared with $31 million for FY 2010); $66.7 million for “other missions and data analysis,” including Cluster II, the Advanced Composition Explorer (ACE), and the Time History of Events and Macroscale Interactions during Substorms (THEMIS) mission; and $48.9 million for sounding rockets.
Military Retirement: Background and Recent Developments
2016-04-06
facilities and programs. Currently, active component personnel are eligible for retirement or “vested” after completing 20 years of service ( YOS ) and have...Defined Benefit Calculations ............................... 4 “High Three” Eligibility and Defined Benefit Calculations...Retirement Eligibility Flowchart ................... 4 Tables Table 1. DOD Retired Military Personnel, Survivors, and Program Costs, FY2005- FY2014
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Sampson, Michael J.
2015-01-01
This presentation is a NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond. This roadmap provides a snapshot for current plans and collaborations on testing and evaluation of electronics as well as a discussion of the technology selection approach.
Library of Michigan FY 2000 LSTA Subgrant Program Guidelines.
ERIC Educational Resources Information Center
Michigan Library, Lansing.
This handbook provides FY (fiscal year) 2000 guidelines developed by the Library of Michigan for applying for LSTA (Library Services and Technology Act) subgrant funding. The handbook includes the following sections: (1) overview of the LSTA subgrant program; (2) general application guidelines for all funding areas; (3) required elements of the…
GLOBAL CHANGE RESEARCH NEWS #8: OUR CHANGING PLANET: THE FY2000 U.S. GLOBAL CHANGE RESEARCH PROGRAM
This edition of Global Change Research News focuses on the publication of the new OurChanging Planet: The FY2000 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices ofthe President's National Science and Technology Council. It...
GLOBAL CHANGE RESEARCH NEWS #24: PUBLICATION OF FY2001 EDITION OF "OUR CHANGING PLANET"
The EPA Global Change Research Program is pleased to inform you of the publication of the new Our Changing Planet: The FY2001 U.S. Global Change Research Program. This annual report to the Congress was prepared under the auspices of the President's National Science and Technolog...
Institutional research and development, FY 1987
DOE Office of Scientific and Technical Information (OSTI.GOV)
Struble, G.L.; Lawler, G.M.; Crawford, R.B.
The Institutional Research and Development program at Lawrence Livermore National Laboratory fosters exploratory work to advance science and technology, disciplinary research to develop innovative solutions to problems in various scientific fields, and long-term interdisciplinary research in support of defense and energy missions. This annual report describes research funded under this program for FY87. (DWL)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... Assistant Administrator for Management and CFO/CAO, Ocean Services and Coastal Zone Management. [FR Doc...-01] RIN 0648-ZC21 Extension of Award Period for FY 2007 Coastal and Estuarine Land Conservation....gov . SUPPLEMENTARY INFORMATION: The Coastal and Estuarine Land Conservation Program was established...
OPERATIONS AND RESEARCH AT THE U.S. EPA INCINERATION RESEARCH FACILITY: ANNUAL REPORT FOR FY94
Fiscal year 1994 (FY94, October 1, 1993 through September 30,1994) saw the continuation of incineration research testing efforts at the IRF. uring the year, two major pilot-scale programs were completed and a third carried to near-completion, and two bench-scale test programs of ...
LDRD 2017 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, Jack; Flynn, Liz
This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2017, as required. In FY 2017, the BNL LDRD Program funded 46 projects, 13 of which were new starts, at a total cost of $10.4M.
DOT National Transportation Integrated Search
1998-07-15
This report documents the assessment of the Constrained Long Range Plan (CLRP) and the FY99-2004 Transportation Improvement Program (TIP) with respect to air quality conformity requirements under the 1990 Clean Air Act Amendments. The assessment used...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011 Lead-Based Paint Hazard Control Grant Program and Lead Hazard Reduction Demonstration Grant Program and Amendment and Technical Corrections AGENCY: Office of Healthy Homes and Lead Hazard Control, HUD. ACTION: Notice of Availability and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
...-0182-02] FY 2010 NIST Center for Neutron Research (NCNR) Comprehensive Grants Program Extension of Due Date for Proposals AGENCY: National Institute of Standards and Technology (NIST), United States Department of Commerce. ACTION: Notice. SUMMARY: NIST publishes this notice to extend the deadline for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... DEPARTMENT OF EDUCATION [CFDA: Number 84.358A] Application Deadline for Fiscal Year (FY) 2013... establish the deadline for submission of fiscal year (FY) 2013 SRSA grant applications. An eligible LEA that is required to submit an application must do so electronically by the deadline in this notice. DATES...
ERIC Educational Resources Information Center
Michigan Library, Lansing.
This handbook provides FY (fiscal year) 2002 guidelines developed by the Library of Michigan for administering LSTA (Library Services and Technology Act) grants. The first section provides an overview of the LSTA program. The second section gives the grant timeline for FY 2002. The third section describes the award process, including award…
Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress
2016-01-05
and is adding 20 berths to all seaframes. The increased berthing supports small increases in the size of the core crew, mission package detachments...for both the FY2009 ships and the FY2010 ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-13
...'s Fiscal Year (FY) 2010 NOFA for the Capital Fund Education and Community Facilities Program--Technical Correction and Extension of Deadline Date AGENCY: Office of the Chief Human Capital Officer, HUD... Availability (NOFA) for the Fiscal Year (FY) 2010 Capital Fund Education and Community Facilities (CFCF...
76 FR 4645 - Fusion Energy Sciences Advisory Committee; Notice of Open Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
..., 9 a.m. to 5 p.m.; Tuesday, March 8, 2011, 8:30 a.m. to 12 p.m. ADDRESSES: Doubletree Bethesda Hotel... year (FY) 2012 budget submission to Congress and to conduct other committee business. Tentative Agenda Items: Office of Science FY 2012 Congressional Budget Request FES Program FY 2012 Congressional Budget...
2005-05-31
building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1994-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Smith, Jacqueline G.; Gardner, James E.
1990-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, J. E.; Dixon, S. C.
1986-01-01
The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, James E.; Dixon, S. C.
1987-01-01
The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campbell, A.N.; Cole, E.I. Jr.; Tangyunyong, Paiboon
This report describes the first practical, non-invasive technique for detecting and imaging currents internal to operating integrated circuits (ICs). This technique is based on magnetic force microscopy and was developed under Sandia National Laboratories` LDRD (Laboratory Directed Research and Development) program during FY 93 and FY 94. LDRD funds were also used to explore a related technique, charge force microscopy, for voltage probing of ICs. This report describes the technical work performed under this LDRD as well as the outcomes of the project in terms of publications and awards, intellectual property and licensing, synergistic work, potential future work, hiring ofmore » additional permanent staff, and benefits to DOE`s defense programs (DP).« less
DOT National Transportation Integrated Search
2016-08-01
This document describes the process and status of developing and implementing agreements, contracts and subcontracts among partner organizations in the New York City Connected Vehicle Pilot Deployment (NYC CVPD). Details include the work elements as ...
75 FR 79863 - Semiannual Regulatory Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... represent that it will make good faith efforts to award subcontracts to small businesses at the same...). It also conforms SBA rules for the section 7(a) Business Loan Program and the Certified Development... Part XVII Small Business Administration ###Semiannual Regulatory Agenda### [[Page 79864
Small Business Administration Semiannual Regulatory Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... represent that it will make good faith efforts to award subcontracts to small businesses at the same...). It also conforms SBA rules for the section 7(a) Business Loan Program and the Certified Development... Business Administration Semiannual Regulatory Agenda] Part XVII Small Business Administration Semiannual...
48 CFR 30.607 - Subcontract administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontract administration. 30.607 Section 30.607 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract...
Solar electric thermal hydronic (SETH) product development project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stickney, B.L.; Sindelar, A.
Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and developmentmore » of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.« less
Information Resources Management Long Range Plan, FY 1995-1999
NASA Technical Reports Server (NTRS)
1994-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.
SIG Galileo final converter technical summary report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hinderman, J.D.
1979-05-01
The report is primarily concerned with the work performed for DOE on converter development and fabrication for the NASA Galileo Jupiter mission as a DOE prime contractor with interface primarily with Teledyne Energy Systems. The activities reported on were directed toward design, analysis and testing of modules and converters SN-1 thru SN-7 and attendant Quality Control and Reliability effort. Although assembly and testing of SN-1 was not accomplished due to the stop work order, the design was virtually completed and a significant amount of subcontracting and manufacturing of both module and converter components was underway. These subcontracting and manufacturing activitiesmore » were selectively closed down depending upon degree of completion and material or hardware potential usage in the Technology Program.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs aremore » discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.« less
2016-08-05
This final rule will update the hospice wage index, payment rates, and cap amount for fiscal year (FY) 2017. In addition, this rule changes the hospice quality reporting program, including adopting new quality measures. Finally, this final rule includes information regarding the Medicare Care Choices Model (MCCM).
NASA Technical Reports Server (NTRS)
Lytle, John
2001-01-01
This report provides an overview presentation of the 2000 NPSS (Numerical Propulsion System Simulation) Review and Planning Meeting. Topics include: 1) a background of the program; 2) 1999 Industry Feedback; 3) FY00 Status, including resource distribution and major accomplishments; 4) FY01 Major Milestones; and 5) Future direction for the program. Specifically, simulation environment/production software and NPSS CORBA Security Development are discussed.
42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...
42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...
42 CFR 412.152 - Definitions for the Hospital Readmissions Reduction Program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... disproportionate share of low-income patients under § 412.106, outliers under subpart F of this part, and a low.... The floor adjustment factor is set at 0.99 for FY 2013, 0.98 for FY 2014, and 0.97 for FY 2015 and... standardized amount adjusted for resource utilization by the applicable MS-DRG relative weight and adjusted for...
1982-02-08
although non-aligned, Malaysia , Indonesia, and Singapore support U.S. presence in South- east Asia and allow unhampered U.S. transit of the vital...modernization of obsolete facilities, maintenance of existing facilities, energy conservation, compliance with environmental and OSHA stan- dards, and NATO
U.S. Army Research Institute 1983 Annual Report
1983-10-01
Olllc») v TYPE OF REPORT a PERIOD COVERED Annual; TY 1983 6 PERFORMING ORG. REPORT NUMBER 6. CONTRACT OR GRANT NUMBERf«) 10. PROGRAM ELEMENT...AtTWACT tCmSm mm nrmam «M» W nmommmr —ä Idomlllr br Mock mnkw; An overview of the FY83 research program la presented in terms of these five research...awards, in-house publication«, professional publications and pres- entations, FY83 program management (mission, the core program , the three component
Metrication report to the Congress
NASA Technical Reports Server (NTRS)
1991-01-01
NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.
NASA's Microgravity Technology Report, 1996: Summary of Activities
NASA Technical Reports Server (NTRS)
Kierk, Isabella
1996-01-01
This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...
78 FR 59798 - Small Business Subcontracting: Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 125 RIN 3245-AG22 Small Business Subcontracting: Correction AGENCY: U.S. Small Business Administration. ACTION: Correcting amendments. SUMMARY: This document... business subcontracting to implement provisions of the Small Business Jobs Act of 2010. This correction...
14 CFR 1274.510 - Subcontracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...
14 CFR 1274.510 - Subcontracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...
Code of Federal Regulations, 2010 CFR
2010-10-01
... addresses the evaluation of the extent of participation of small disadvantaged business (SDB) concerns in... are addressed in this subpart— (a) An evaluation factor or subfactor for the participation of SDB concerns in performance of the contract; and (b) An incentive subcontracting program for SDB concerns. [63...
Code of Federal Regulations, 2014 CFR
2014-10-01
... addresses the evaluation of the extent of participation of small disadvantaged business (SDB) concerns in... are addressed in this subpart— (a) An evaluation factor or subfactor for the participation of SDB concerns in performance of the contract; and (b) An incentive subcontracting program for SDB concerns. [63...
Code of Federal Regulations, 2013 CFR
2013-10-01
... addresses the evaluation of the extent of participation of small disadvantaged business (SDB) concerns in... are addressed in this subpart— (a) An evaluation factor or subfactor for the participation of SDB concerns in performance of the contract; and (b) An incentive subcontracting program for SDB concerns. [63...
Code of Federal Regulations, 2012 CFR
2012-10-01
... addresses the evaluation of the extent of participation of small disadvantaged business (SDB) concerns in... are addressed in this subpart— (a) An evaluation factor or subfactor for the participation of SDB concerns in performance of the contract; and (b) An incentive subcontracting program for SDB concerns. [63...
Code of Federal Regulations, 2011 CFR
2011-10-01
... addresses the evaluation of the extent of participation of small disadvantaged business (SDB) concerns in... are addressed in this subpart— (a) An evaluation factor or subfactor for the participation of SDB concerns in performance of the contract; and (b) An incentive subcontracting program for SDB concerns. [63...
A Manhattan Project in Educational Technology, Part II.
ERIC Educational Resources Information Center
Roberts, Wesley K.
The initial four phases of the Training Extension Course (TEC), a project to remedy deficiencies in training programs for armed forces recruits, employed systematic instructional development and extensive audiovisual resources. The project required subcontracting for lesson production and modifications in personnel and budgeting. Posttest evidence…
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 30.201-5 Waiver. (a) The head of... outweigh the risk associated with the waiver. The determination that exceptional circumstances exist must... or subcontract price. (7) The benefits to the Government of waiving CAS. (8) The potential risk to...
Code of Federal Regulations, 2011 CFR
2011-10-01
... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 1330.201-5 Waiver. The designee authorized to waive the applicability of Cost Accounting Standards for a particular contract or subcontract... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Waiver. 1330.201-5 Section...
Human genome. 1993 Program report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
The purpose of this report is to update the Human Genome 1991-92 Program Report and provide new information on the DOE genome program to researchers, program managers, other government agencies, and the interested public. This FY 1993 supplement includes abstracts of 60 new or renewed projects and listings of 112 continuing and 28 completed projects. These two reports, taken together, present the most complete published view of the DOE Human Genome Program through FY 1993. Research is progressing rapidly toward 15-year goals of mapping and sequencing the DNA of each of the 24 different human chromosomes.
Review of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program
2015-05-01
spell out) originating request, including DoD action officer, email address, and commercial and DSN phone number ; 3. Description...does not display a currently valid OMB control number . 1. REPORT DATE MAY 2015 2. REPORT TYPE 3. DATES COVERED 4. TITLE AND SUBTITLE Review...of the Fiscal Year 2014 (FY14) Defense Environmental International Cooperation (DEIC) Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM
48 CFR 49.108 - Settlement of subcontract settlement proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement of subcontract settlement proposals. 49.108 Section 49.108 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108 Settlement of subcontract...
48 CFR 1519.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...
Overview of Doing Business with SPAWAR Systems Command (SPAWAR)
2011-08-22
School Girls Day Out FY07 – 1 school FY08 – 34 schools FY09 – 35 schools FY10 – 47 schools Material World Modules International Autonomous Underwater...s it e , a n d a ls o f rom t h e foll o vn n g link: e-CC Self -Service News The 23rd P.nnual Na v y Gold Coast Small Business O pportunity Conf...Opportunities 1. Requirements Office: Joint Program Manager - Information Systems (JPMIS) 2. Joint Effects Model (JEM) Increment 1 Sustainment 3
1981-01-01
ACTIVITIES .......... ............................ 111-548 3/ de ~ &04A.... ~UNCLASSIFIED xiii 0- 4 UNCLASSIFIED FY 1932 ROTE CONGRESSIONAI. DESCRIPTIVE...Title: Comeunicatiois gnlineerin De -elo pmnt DOD Mission Area: i256 - Tactical Communications Sudget Activity: 04 - TactictI Programs Into the...tconditions ot heavy miiltary traffic, high speeds, and severe weather. Army Remote Sensors (REMS) were used to provide 4-cnrity of the Olympic Village complex
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1993-01-01
The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Dixon, S. C.; Gardner, James E.
1988-01-01
The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
Activities in Idaho; status of projects, fiscal years 1982-83
Channel, Linda K.
1982-01-01
Twenty-three projects were conducted by the Water Resources Division of the U.S. Geological Survey in Idaho during FY 's (fiscal year) 1982-83. These projects were done in cooperation with seven State and local and nine federal agencies. State and local cooperative funding amounted to $566,123 in FY 1982 and $570,000 (projected monies) in FY 1983; Federal funding amounted to $2,083,748 in FY 1982 and $1,656,494 (projected monies) in FY 1983. Eighty-three persons were employed as of September, FY 1982--40 full time and 43 other than full time. Sixty-five persons were employed as of October, FY 1983--35 full time and 30 other than full time. In addition, the Water Resources Division maintains a project office at the Idaho National Engineering Laboratory. Work there is done in cooperation with the U.S. Department of Energy, which provides most of the funding. Some Federal funds are provided for special projects. Projects other than continuing programs for collection of hydrologic data included flood-mapping studies, geothermal-resource investigations, groundwater-quality assessments, basin-and region-wide water-resource investigations , river quality-of-water monitoring studies, volcanic-ash-related studies, groundwater trends and stream gaging-program evaluations, river erosion and sediment-transport studies, water-budget and groundwater-use determinations, and a sole-source aquifer appraisal. (USGS)
48 CFR 970.1907-1 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-24
... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...
48 CFR 49.606 - Granting subcontract settlement authorization.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-furnished material or articles completed but undelivered under the subcontract or purchase order, as these... articles may be disposed of without Government approval or screening if the total amount (at subcontract... retention or other disposal of termination inventory allocated to the settlement proposal. (ii) Deduct...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 970.5227-6 - Patent indemnity-subcontracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...
48 CFR 35.009 - Subcontracting research and development effort.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.009 Subcontracting research and development effort. Since the selection of R&D contractors is substantially based on... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontracting research...
Interior, Environment, and Related Agencies: FY2007 Appropriations
2007-03-07
reported bill for FY2007, from the FY2006 level, were the following: ! $-209.5 million (9%) for the National Park Service (NPS); ! $-153.5 million (10%) for...Humphries RSI 7-7264 mhumphries@crs.loc.gov National Park Service David Whiteman RSI 7-7786 dwhiteman@crs.loc.gov Payments in Lieu of Taxes Program (PILT) M...11 National Wildlife Refuge System and Law Enforcement . . . . . . . . . . 12 Avian Flu
State, Foreign Operations, and Related Programs: FY2009 Appropriations
2008-11-20
including political, security, social environment, and best ways to engage local populations) in designing new embassies buildings. In the funding...political, economic, and social reforms. The President initially promised $5 billion annually by FY2006, although funds requested and appropriated...other areas.11 In FY2008, BBG proposed to reduce or eliminate radio broadcasting in a number of services, including Cantonese , Ukrainian, Tibetan
FY 1978 Budget, FY 1979 Authorization Request and FY 1978-1982 Defense Programs,
1977-01-17
technological opportunities with defense applica- tions -- such as long-range cruise missiles and guidance, improved sensors, 25 miniaturization, and computer ...Various methods exist for computing the number of theater nuclear weapons needed to perform these missions with an acceptable level of confidence...foreign military forces. Mini-micro computers are especially interesting. -- Finally, since geography remains important, we must recognize that the
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2013
2013-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2010
2010-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2009
2009-01-01
In November 1996, the voters of Montgomery County approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County Council would…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2012
2012-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2006
2006-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
The project is a significant part of Hawthorne Army Ammunition Depot`s effort to achieve a 20-percent reduction in energy consumption by FY2000 versus FY1985 baseline levels. The project will also assure that heating services are provided to Industrial Area facilities on a continuing basis, supporting mission requirements.
1997-04-10
The audit objective was to determine the accuracy and completeness of the audit of the U.S. Army Corps of Engineers, Civil Works Program, FY 1996...financial statements conducted by the Army Audit Agency. See Appendix C for a discussion of the audit process.
NASA Technical Reports Server (NTRS)
Stephens, J. R.
1982-01-01
The COSAM program for reduction of the use of strategic alloying elements in nickel-based superalloys for gas turbine engines was reviewed. Sources, consumption, and pricing of cobalt, tantalum, columbium, and chromium are surveyed. Research projects in strategic element substitution, advanced processing concepts, and the development of alternate materials (intermetallics and iron-base alloys) are listed and research plans for FY 1983 and FY 1984 summarized.
ERIC Educational Resources Information Center
Montgomery County Public Schools, 2007
2007-01-01
In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on years) the County…
FY 1986 science budget overview
NASA Astrophysics Data System (ADS)
Richman, Barbara T.; Robb, David W.
Continental lithosphere research, scientific ocean drilling, investigative surveys in the Exclusive Economic Zone, and the Mars Observer were among those programs that fared best in the federal budget proposal for fiscal year (FY) 1986 that President Ronald Reagan sent to Congress last week. However, the Sea Grant and Coastal Zone Management programs were among those that fell victim to the budget ax once again.
Marshall Space Flight Center Small Business Opportunities
NASA Technical Reports Server (NTRS)
Garrison, Lynn
2007-01-01
This viewgraph presentation reviews the small business opportunities that are available with the Marshall Space Flight Center. It includes information on all forms of opportunities available and information sources: subcontracting, websites, contacts and a separate section on Small Business Innovation Research (SBIR) & Small Business Technology Transfer (STTR) Programs
48 CFR 1819.708 - Contract clauses. (NASA supplements paragraph (b))
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Contract clauses. (NASA supplements paragraph (b)) 1819.708 Section 1819.708 Federal Acquisition Regulations System NATIONAL... Subcontracting Program 1819.708 Contract clauses. (NASA supplements paragraph (b)) (b)(1) The contracting officer...
48 CFR 1819.708 - Contract clauses. (NASA supplements paragraph (b))
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clauses. (NASA supplements paragraph (b)) 1819.708 Section 1819.708 Federal Acquisition Regulations System NATIONAL... Subcontracting Program 1819.708 Contract clauses. (NASA supplements paragraph (b)) (b)(1) The contracting officer...
48 CFR 1819.708 - Contract clauses. (NASA supplements paragraph (b))
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clauses. (NASA supplements paragraph (b)) 1819.708 Section 1819.708 Federal Acquisition Regulations System NATIONAL... Subcontracting Program 1819.708 Contract clauses. (NASA supplements paragraph (b)) (b)(1) The contracting officer...
48 CFR 1819.708-70 - NASA solicitation provision and contract clause.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation provision and contract clause. 1819.708-70 Section 1819.708-70 Federal Acquisition Regulations System... Business Subcontracting Program 1819.708-70 NASA solicitation provision and contract clause. (a) The...
48 CFR 1819.708 - Contract clauses. (NASA supplements paragraph (b))
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contract clauses. (NASA supplements paragraph (b)) 1819.708 Section 1819.708 Federal Acquisition Regulations System NATIONAL... Subcontracting Program 1819.708 Contract clauses. (NASA supplements paragraph (b)) (b)(1) The contracting officer...
48 CFR 1819.708 - Contract clauses. (NASA supplements paragraph (b))
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Contract clauses. (NASA supplements paragraph (b)) 1819.708 Section 1819.708 Federal Acquisition Regulations System NATIONAL... Subcontracting Program 1819.708 Contract clauses. (NASA supplements paragraph (b)) (b)(1) The contracting officer...
48 CFR 1819.708-70 - NASA solicitation provision and contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation provision and contract clause. 1819.708-70 Section 1819.708-70 Federal Acquisition Regulations System... Business Subcontracting Program 1819.708-70 NASA solicitation provision and contract clause. (a) The...
48 CFR 1819.708-70 - NASA solicitation provision and contract clause.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation provision and contract clause. 1819.708-70 Section 1819.708-70 Federal Acquisition Regulations System... Business Subcontracting Program 1819.708-70 NASA solicitation provision and contract clause. (a) The...
48 CFR 1819.708-70 - NASA solicitation provision and contract clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation provision and contract clause. 1819.708-70 Section 1819.708-70 Federal Acquisition Regulations System... Business Subcontracting Program 1819.708-70 NASA solicitation provision and contract clause. (a) The...
13 CFR 121.1001 - Who may initiate a size protest or request a formal size determination?
Code of Federal Regulations, 2011 CFR
2011-01-01
... Associate Administrator for Business Development. (3) For SBA's Subcontracting Program, the following... SBA Director, Office of Government Contracting, or the SBA Associate Administrator for Business... Associate Administrator for Business Development. (8) For SBA's Service Disabled Veteran-Owned Small...
13 CFR 121.1001 - Who may initiate a size protest or request a formal size determination?
Code of Federal Regulations, 2013 CFR
2013-01-01
... Associate Administrator for Business Development. (3) For SBA's Subcontracting Program, the following... SBA Director, Office of Government Contracting, or the SBA Associate Administrator for Business... Associate Administrator for Business Development. (8) For SBA's Service Disabled Veteran-Owned Small...
DOE Office of Scientific and Technical Information (OSTI.GOV)
OGEKA,G.J.
1998-12-31
In FY 1998, the BNL LDBD Program funded 20 projects, 4 of which were new starts, at a total cost of $2,563,681. The small number of new starts was a consequence of severe financial problems that developed between FY 1997 and 1998. Emphasis was given to complete funding for approved multi-year proposals. Following is a table which lists all of the FY 1998 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which follow. A total of 17more » informal publications (abstracts, presentations, BNL reports and workshop papers) were reported and an additional 13 formal (full length) papers were either published, are in press or being prepared for publication. The investigators on five projects have filed for a patent. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. In conclusion, a significant measure of success is already attributable to the FY 1998 LDBD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less
NREL Energy Storage Projects. FY2014 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pesaran, Ahmad; Ban, Chunmei; Burton, Evan
2015-03-01
The National Renewable Energy Laboratory supports energy storage R&D under the Office of Vehicle Technologies at the U.S. Department of Energy. The DOE Energy Storage Program’s charter is to develop battery technologies that will enable large market penetration of electric drive vehicles. These vehicles could have a significant impact on the nation’s goal of reducing dependence on imported oil and gaseous pollutant emissions. DOE has established several program activities to address and overcome the barriers limiting the penetration of electric drive battery technologies: cost, performance, safety, and life. These programs are; Advanced Battery Development through the United States Advanced Batterymore » Consortium (USABC); Battery Testing, Analysis, and Design; Applied Battery Research (ABR); and Focused Fundamental Research, or Batteries for Advanced Transportation Technologies (BATT) In FY14, DOE funded NREL to make technical contributions to all of these R&D activities. This report summarizes NREL’s R&D projects in FY14 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY14 projects under NREL’s Energy Storage R&D program are briefly described below. Each of these is discussed in depth in this report.« less
Research and development strategic plan : FY2013-FY2017.
DOT National Transportation Integrated Search
2013-05-01
This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...
50 CFR 86.41 - How long will the money be available?
Code of Federal Regulations, 2010 CFR
2010-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE... obligation for a total of three fiscal years (e.g. FY 2000 funds will remain available through FY 2002) (16 U...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... Billing for Skilled Nursing Facilities for FY 2014; Correction AGENCY: Centers for Medicare & Medicaid...; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities for FY 2014.'' DATES: These...
2009-06-03
This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).
1987-07-01
8217. -. , i U ELF ECOLOGICAL MONITORING PROGRAM INDEX OF 1986 ANNUAL REPORTS A. Herbaceous Plant Cover and Tree Studies \\ Michigan Technological University...SUBCONTRACT NUMBER EO 6549-84-C-005 LELF Communications System Ecological Monitoring Program BIOLOGICAL STUDIES ON POLLINATING INSECTS: MEGACHILID...such as those in the vicinity of the ELF antenna because they are pollinators of flowering plants , and are therefore important to the reproductive
48 CFR 215.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontract pricing considerations. 215.404-3 Section 215.404-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contract Pricing 215.404-3 Subcontract pricing considerations. Follow the procedures at PGI 215.404-3 when...
76 FR 61626 - Small Business Subcontracting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-05
... SMALL BUSINESS ADMINISTRATION 13 CFR Parts 121 and 125 RIN 3245-AG22 Small Business Subcontracting AGENCY: U.S. Small Business Administration. ACTION: Proposed rule. SUMMARY: The U.S. Small Business... Business Jobs Act of 2010, which pertain to small business subcontracting. SBA is proposing to amend its...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...
48 CFR 970.5236-1 - Government facility subcontract approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...
48 CFR 970.5236-1 - Government facility subcontract approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...
48 CFR 970.5236-1 - Government facility subcontract approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 1852.219-75 - Small business subcontracting reporting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...
48 CFR 2452.219-70 - Small business subcontracting plan compliance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...