Sample records for subcontract technical status

  1. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to complete all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the second quarter (1/1/2013 to 3/31/2013), all the technical and legal documents for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. The revised CRADA documents were sent to DOE, Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for completing legal documents for the project. A non-disclosure agreement was revised and sent to all the parties for reviews.« less

  2. Annual Report: Photovoltaic Subcontract Program FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Summers, K. A.

    1991-03-01

    This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less

  3. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  4. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  5. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  6. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  7. The Photovolatic Manufacturing Technology project (PVMaT) after three years

    NASA Astrophysics Data System (ADS)

    Witt, C. Edwin; Mitchell, Richard L.; Thomas, Holly; Herwig, Lloyd O.

    1994-08-01

    The Photovoltaic Manufacturing Technology project (PVMaT) is a government/industry research and development (R&D) partnership involving joint efforts between the federal government (through the US Department of Energy (DOE)) and members of the US photovoltaic (PV) industry. The project's goal is to assist US industry in retaining and extending its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is being carried out in three separate phases, each designed to address separate R&D requirements for achieving PVMaT goals. Phase 1 was a problem identification phase of about 3 months duration. In Phase 1, the status and needs of the US PV manufacturing industry were identified, and the development of a Phase 2 procurement responsive to the industry's needs was begun. Phase 1 was completed in 1991. Problem solution began in 1992, under Phase 2A, when DOE awarded multiyear subcontracts. Technical accomplishments for PVMaT 2A are presented in this paper. Subcontracts were recently awarded for a second, overlapping, and similar process-specific solicitation (PVMaT 2B). The activities of these new subcontracts are also described. Two subcontracts presently comprise the Phase 3 effort. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. A teamed research approach is being used to improve automated module manufacturing lines and encapsulation materials used in module manufacturing. The first year's work on these subcontracts is also described in this paper.

  8. Photovoltaic Subcontract Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surek, Thomas; Catalano, Anthony

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  9. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.« less

  10. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  11. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  12. Photovoltaic Subcontract Program. Annual report, FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  13. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the best scientific and technological sources, it is important that the contractor not subcontract technical or scientific work without the contracting officer's advance knowledge. During the negotiation of a cost-reimbursement R&D contract, the contracting officer shall obtain complete information...

  14. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  15. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  16. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  17. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  18. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  19. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  20. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  1. 48 CFR 1352.215-70 - Proposal preparation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; justifications for noncompetitive proposed subcontracts; identification of technical data to be withheld; and any... evaluation factor.] Evaluation Factor 1—Technical Approach. Provide information on how the project is to be organized, staffed, and managed that demonstrates the offeror's understanding and effective management of...

  2. Management of optics. [for HEAO-2 X ray telescope

    NASA Technical Reports Server (NTRS)

    Kirchner, T. E.; Russell, M.

    1981-01-01

    American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

  3. 76 FR 30990 - Notice of Funding Availability for the Small Business Transportation Resource Center Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... contracts and subcontracts portfolio. 3. Provide a minimum of 20 hours of individual or group counseling... training programs, such as, business assessment, management training, counseling, technical assistance... information dissemination, small business counseling, and technical assistance with small businesses currently...

  4. 75 FR 23319 - Notice of Funding Availability for the Small Business Transportation Resource Center Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... contracts and subcontracts portfolio. 3. Provide a minimum of 20 hours of individual or group counseling... programs, such as, business assessment, management training, counseling, technical assistance, marketing... dissemination, small business counseling, and technical assistance with small businesses currently doing...

  5. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  6. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  7. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  8. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  9. 48 CFR 919.7011 - Developmental assistance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Engineering and other technical assistance; (3) Noncompetitive award of subcontracts under DOE or other... activities; (5) Progress payments based on costs; (6) Rent-free use of facilities and/or equipment owned or...

  10. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... such rights should be acquired. No such rights should be obtained from a small business or non-profit organization, unless similar rights in background inventions of the small business or non-profit organization... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Rights in technical data...

  11. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... such rights should be acquired. No such rights should be obtained from a small business or non-profit organization, unless similar rights in background inventions of the small business or non-profit organization... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Rights in technical data...

  12. Connected Vehicle Pilot Deployment Program phase 1 : partnership status summary : New York City : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the process and status of developing and implementing agreements, contracts and subcontracts among partner organizations in the New York City Connected Vehicle Pilot Deployment (NYC CVPD). Details include the work elements as ...

  13. Subcontracting Transparency and Reliability Act of 2012

    THOMAS, 112th Congress

    Rep. Mulvaney, Mick [R-SC-5

    2012-02-02

    House - 12/27/2012 Placed on the Union Calendar, Calendar No. 534. (All Actions) Notes: For further action, see H.R.4310, which became Public Law 112-239 on 1/2/2013. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  14. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... delivery of such data on behalf of the Government. Accordingly, subject to the policy set forth in this... under appropriate restrictions, co-extensive license rights for data which are limited rights data and...

  15. 48 CFR 209.571-6 - Identification of organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... business units performing systems engineering and technical assistance, professional services, or... parent corporate entity, particularly the award of a subcontract for software integration or the development of a proprietary software system architecture; and (c) The performance by, or assistance of...

  16. 48 CFR 209.571-6 - Identification of organizational conflicts of interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... business units performing systems engineering and technical assistance, professional services, or... parent corporate entity, particularly the award of a subcontract for software integration or the development of a proprietary software system architecture; and (c) The performance by, or assistance of...

  17. 48 CFR 209.571-6 - Identification of organizational conflicts of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... business units performing systems engineering and technical assistance, professional services, or... parent corporate entity, particularly the award of a subcontract for software integration or the development of a proprietary software system architecture; and (c) The performance by, or assistance of...

  18. Apollo lunar orbital sciences program alpha and X-ray spectrometers

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The development of the alpha and X-ray spectrometers which were used on the Apollo 15 and 16 flights is discussed. Specific subjects presented are: (1) lunar program management, (2) scientific and technical approach, (3) major test programs, (4) reliability, quality assurance, and safety, and (5) subcontract management.

  19. SIG Galileo final converter technical summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinderman, J.D.

    1979-05-01

    The report is primarily concerned with the work performed for DOE on converter development and fabrication for the NASA Galileo Jupiter mission as a DOE prime contractor with interface primarily with Teledyne Energy Systems. The activities reported on were directed toward design, analysis and testing of modules and converters SN-1 thru SN-7 and attendant Quality Control and Reliability effort. Although assembly and testing of SN-1 was not accomplished due to the stop work order, the design was virtually completed and a significant amount of subcontracting and manufacturing of both module and converter components was underway. These subcontracting and manufacturing activitiesmore » were selectively closed down depending upon degree of completion and material or hardware potential usage in the Technology Program.« less

  20. Nuclear Lunar Logistics Study

    NASA Technical Reports Server (NTRS)

    1963-01-01

    This document has been prepared to incorporate all presentation aid material, together with some explanatory text, used during an oral briefing on the Nuclear Lunar Logistics System given at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, on 18 July 1963. The briefing and this document are intended to present the general status of the NERVA (Nuclear Engine for Rocket Vehicle Application) nuclear rocket development, the characteristics of certain operational NERVA-class engines, and appropriate technical and schedule information. Some of the information presented herein is preliminary in nature and will be subject to further verification, checking and analysis during the remainder of the study program. In addition, more detailed information will be prepared in many areas for inclusion in a final summary report. This work has been performed by REON, a division of Aerojet-General Corporation under Subcontract 74-10039 from the Lockheed Missiles and Space Company. The presentation and this document have been prepared in partial fulfillment of the provisions of the subcontract. From the inception of the NERVA program in July 1961, the stated emphasis has centered around the demonstration of the ability of a nuclear rocket to perform safely and reliably in the space environment, with the understanding that the assignment of a mission (or missions) would place undue emphasis on performance and operational flexibility. However, all were aware that the ultimate justification for the development program must lie in the application of the nuclear propulsion system to the national space objectives.

  1. High Technology Engineering Services, Inc. fiscal year 1993 and 1994 research and development report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document has been prepared by the Professional Staff of High Technology Engineering Services, Inc. (HTES) for fiscal year (FY) 1993. Work was performed for various aspects of mechanical design and analysis, materials development and properties quantification, nuclear environment performance, and engineering program prioritization. The tasks enumerated in the subcontract, attachment B are: 1. Assist in preparation of final R&D report for SDC detector development. 2. Subcontractor shall make contributions to the development of innovative processes for the manufacture of quasi- isotropic, enhanced thermal conductivity compression molded advanced composite materials. 3. Perform finite element analysis as it relates to themore » Superconducting Super Collider Silicon Tracking System, both mechanical and thermal, of very thin section advanced composite materials. 4. Subcontractor shall perform technical studies, reviews, and assessments of the current program for advanced composites materials processing and testing. 5. Subcontractor shall attend meetings and discussions as directed by MEE-12 technical representative. Unfortunately during the course of FY93, technical and financial challenges prevailed against the aggressive goals set for the program. In point of fact, less than 25% of the contract value was able to be expended due to technical delays and programmatic funding cuts. Also, contracting difficulties with the SSC Lab and financial burdens at Los Alamos totally stopped progress on the subject subcontract during the whole of FY94. This was a great blow to me and the HTES, Inc. technical staff. Despite the negative influences over the years, significant progress was made in materials properties quantification and development of essential research and development documentation. The following brief report and attendant appendices will address these achievements.« less

  2. 76 FR 68013 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-54; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... the Small Business Administration (SBA) in its Small Disadvantaged Business (SDB) regulations. The FAR... self-represent their SDB status to prime contractors in good faith when seeking Federal subcontracting opportunities. This FAR revision removed an administrative burden for SDB subcontractors to obtain SBA...

  3. 48 CFR 42.502 - Selecting contracts for postaward orientation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...

  4. 48 CFR 42.502 - Selecting contracts for postaward orientation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...

  5. 48 CFR 42.502 - Selecting contracts for postaward orientation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...

  6. 48 CFR 42.502 - Selecting contracts for postaward orientation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and complexity of the contract; (c) Complexity and acquisition history of the product or service; (d... subcontracting; (h) Contractor's performance history and experience with the product or service; (i) Contractor's status, if any, as a small business, small disadvantaged, women-owned, veteran-owned, HUBZone, or service...

  7. Standard Terms and Conditions | NREL

    Science.gov Websites

    and Technical Services Subcontracts, Cost-Type (1) Cost Sharing (2) Cost Reimbursement (3) Cost Plus Than Foreign) (1) Cost Sharing (2) Cost Reimbursement (2) Cost Plus Fixed Fee. Appendix B-10 (12/15/16 /15/16) Standard Terms and Conditions for Travel Requirements (1) Cost Sharing (2) Cost Reimbursement

  8. Acquisition Workforce Strategy: The Challenge Department of Defense (DoD) Faces to Improve its Acquisition Workforce

    DTIC Science & Technology

    2011-12-01

    Personnel Trends Relevant to Policy, 1993–2006. Santa Monica, CA: RAND Corporation/TR-572-OSD, by Gates, Susan M., Edward G. Keating , Adria D...settlement of contracts and subcontracts. Duties include evaluating information about contractor economic assertions, comparing those assertions to...Quality, and Manufacturing Acquisition-related manufacturing and production duties vary greatly in managerial , administrative, and technical

  9. 76 FR 68044 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-54; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... implements revisions made by the Small Business Administration (SBA) in its Small Disadvantaged Business (SDB..., to allow SDBs to self-represent their SDB status to prime contractors in good faith when seeking Federal subcontracting opportunities. This FAR revision removed an administrative burden for SDB...

  10. Final Technical Report for subcontract number B612144

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mayali, X.; Marcu, O.

    The original statement of work stipulated that the Subcontractor shall perform bacterial and algal cultivation and manipulation, microbe isolation, preparation of samples for sequencing and isotopic analysis, data analysis, and manuscript preparation. The Subcontractor shall work closely with Dr. Mayali and other LLNL scientists, and shall participate in monthly SFA meetings (either in person or by telephone). The Subcontractor shall deliver a final report at the conclusion of the work.

  11. JPRS Report, Science & Technology. Europe: Economic Competitiveness

    DTIC Science & Technology

    1991-01-28

    development: funding of R&D contracts subcontracted to external parties by companies with less than 1000 employees. • Technically oriented company... Analysis Using Molecular Biology," which it has been sponsoring since 1985. As of 1991, the program will receive a total of DM25 Million in...For instance, the five Dutch multinationals—Shell, Philips, Unilever , Akzo, DSM—earmark about 20 percent of their R&D budget to basic research

  12. Final Report for PV Incubator Subcontract No. NAT-0-99013-01: June 14, 2010 - March 2, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghosal, K.

    2012-04-01

    The goal of the subcontract is to scale up Semprius' novel micro-cell based modules to an annualized rate of 500 kW of receivers and 10 kW of modules, in support of the DOE 2020 Sunshot Initiative goals. The statement of work (SOW) was broken up into two Phases. Phase I was directed towards process development efforts towards addressing fundamental manufacturing metrics such as yield, die per wafer, automation and throughput. Phase II objectives are to scale to an annualized production rate of 500 kW of receivers and 10 kW of modules, while improving cell efficiency, module efficiency and transfer yield.more » Semprius has met all the technical milestones and deliverables for the contract. All subtasks were completed earlier than expected and the results exceeded the technical targets. In particular, 3J cell efficiency of 41.2% exceeded the target of 38%, module efficiency of 28.3% exceeded the target of 28% and transfer yield of 96.4% exceeds the target of 95%, with all tasks completed well ahead of schedule. Also, devices fabricated from 1st use GaAs substrates and substrates with two re-uses have been shown to be identical.« less

  13. Special environmental control and life support equipment test analyses and hardware

    NASA Technical Reports Server (NTRS)

    Callahan, David M.

    1995-01-01

    This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

  14. An Analysis of Operational Availability of Brazilian Navy and Argentine Air Force A-4 Fleets Using Simulation Modeling

    DTIC Science & Technology

    1999-12-01

    Escuela de Ingenieria Aeronäutica, 1982 Submitted in partial fulfillment of the requirements for the degree of MASTER OF SCD2NCE IN MANAGEMENT...defense industry , including joint production, technical data sharing, and reciprocal subcontracting in the joint development and production of a...34Foundations of Manufacturing Management". 15. Barton, Russell R., Simulation Metamodels, Department of Industrial and Manufacturing Engineering, The

  15. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  16. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  17. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  18. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  19. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  20. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND... notify the Contracting officer in writing at least 30 days in advance of entering into any subcontract or...

  1. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracts and work... Subcontracts and work coordination. The contracting officer shall insert the clause at 852.236-80, Subcontracts and work coordination, in solicitations and contracts for construction expected to exceed the micro...

  2. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  3. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  4. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  5. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  6. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  7. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  8. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  9. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  10. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  11. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  12. 48 CFR 1052.219-71 - Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...

  13. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  14. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services. >

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Subcontracting for nuclear... Clauses 952.225-70 Subcontracting for nuclear hot cell services.> As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  15. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  16. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  17. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  18. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  19. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  20. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  1. Improved self-contained breathing apparatus concept. Final report Oct 80-Jun 82

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, L.; Walker, J.

    1982-08-01

    Past operational experiences of USAF fire fighting and rescue teams have indicated the need for an improved self-contained breathing apparatus (SCBA). In October 1980, a contract was awarded to Electronic Data Systems, Panama City, Florida, to design and develop a prototype SCBA that would meet Air Force technical requirements. A prototype was designed, developed, and tested through a subcontract with Reimers Consultants, Falls Church, Virginia. This report describes the technical requirements, a detailed technical description of the unit, and the unmanned test procedures and results. The unmanned testing demonstrate that the prototype SCBA meets all performance requirements, except for weight.more » The fully charged prototype weights 34 pounds, the maximum acceptable weight is 30 pounds. With the other performance requirements either met or exceeded, manned testing of the SCBA can proceed.« less

  2. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  3. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  4. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  5. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  6. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  7. Organic geochemistry data of Alaska

    USGS Publications Warehouse

    complied by Threlkeld, Charles N.; Obuch, Raymond C.; Gunther, G.L.

    2000-01-01

    In order to archive the results of various petroleum geochemical analyses of the Alaska resource assessment, the USGS developed an Alaskan Organic Geochemical Data Base (AOGDB) in 1978 to house the data generated from USGS and subcontracted laboratories. Prior to the AOGDB, the accumulated data resided in a flat data file entitled 'PGS' that was maintained by Petroleum Information Corporation with technical input from the USGS. The information herein is a breakout of the master flat file format into a relational data base table format (akdata).

  8. SIMULATED COAL GAS MCFC POWER PLANT SYSTEM VERIFICATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.A. Scroppo

    1998-07-01

    This is the Technical Progress Report covering June 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate.

  9. SIMULATED COAL GAS MCFC POWER PLANT SYSTEM VERIFICATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-31

    This is the Technical Progress Report covering October 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate.

  10. 48 CFR 2019.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705-4 Reviewing the subcontracting plan...

  11. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...

  12. Billie Christen | NREL

    Science.gov Websites

    , administration, and placement of subcontracts for both centers, ensuring that the objectives are met and that the develop budgets for subcontracts and makes sure the subcontracts are properly initiated and closed out in

  13. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontract administration. 30.607 Section 30.607 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract...

  14. Solar electric thermal hydronic (SETH) product development project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickney, B.L.; Sindelar, A.

    Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and developmentmore » of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.« less

  15. 48 CFR 219.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business firms specifically identified in the subcontracting plan. Notifications shall be in writing and... SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business... business concerns shall include subcontracts with historically black colleges and universities and minority...

  16. Scientific Data Analysis and Software Support: Geodynamics

    NASA Technical Reports Server (NTRS)

    Klosko, Steven; Sanchez, B. (Technical Monitor)

    2000-01-01

    The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.

  17. 77 FR 9658 - General Services Administration Acquisition Regulation; Information Collection; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  18. 78 FR 59798 - Small Business Subcontracting: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 125 RIN 3245-AG22 Small Business Subcontracting: Correction AGENCY: U.S. Small Business Administration. ACTION: Correcting amendments. SUMMARY: This document... business subcontracting to implement provisions of the Small Business Jobs Act of 2010. This correction...

  19. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  20. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  1. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  2. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  3. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  4. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  5. 48 CFR 49.108 - Settlement of subcontract settlement proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement of subcontract settlement proposals. 49.108 Section 49.108 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108 Settlement of subcontract...

  6. 48 CFR 1519.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...

  7. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  8. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  9. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  10. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  11. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  12. Department of Defense Companies Participating in the Department of Defense Subcontracting Program. First Three Quarters Fiscal Year 1990

    DTIC Science & Technology

    1990-01-01

    This report presents a variety of subcontract data collected from Department of Defense (DOD) large business firms that have received at least one...award in excess of $500,000 ($1,000,000 for construction). Public Law 95-507 requires that these contractors establish a small business and small...disadvantaged business subcontracting program and report to DOD quarterly, using Standard Form 295, on subcontract awards made to these types of firms

  13. 48 CFR 970.1907-1 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...

  14. 77 FR 31016 - General Services Administration Acquisition Regulation; Submission for OMB Review; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  15. 13 CFR 126.701 - Can these subcontracting percentages requirements change?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Can these subcontracting percentages requirements change? 126.701 Section 126.701 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.701 Can these subcontracting percentages...

  16. 48 CFR 49.606 - Granting subcontract settlement authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-furnished material or articles completed but undelivered under the subcontract or purchase order, as these... articles may be disposed of without Government approval or screening if the total amount (at subcontract... retention or other disposal of termination inventory allocated to the settlement proposal. (ii) Deduct...

  17. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  18. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  19. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  20. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  1. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  2. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.009 Subcontracting research and development effort. Since the selection of R&D contractors is substantially based on... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontracting research...

  3. 48 CFR 215.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontract pricing considerations. 215.404-3 Section 215.404-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contract Pricing 215.404-3 Subcontract pricing considerations. Follow the procedures at PGI 215.404-3 when...

  4. 76 FR 61626 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Parts 121 and 125 RIN 3245-AG22 Small Business Subcontracting AGENCY: U.S. Small Business Administration. ACTION: Proposed rule. SUMMARY: The U.S. Small Business... Business Jobs Act of 2010, which pertain to small business subcontracting. SBA is proposing to amend its...

  5. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  6. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  7. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  8. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  9. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  10. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  11. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  12. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  13. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  14. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  15. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  16. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  17. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  18. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  19. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  20. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  1. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  2. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  3. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  4. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  5. 48 CFR 31.204 - Application of principles and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-price subcontract with economic price adjustment provisions. (c) Costs incurred as payments under firm-fixed-price subcontracts or fixed-price subcontracts with economic price adjustment provisions or... captures the essential nature of, the cost at issue. [48 FR 42301, Sept. 19, 1983, as amended at 53 FR...

  6. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Small business... Clauses 52.219-9 Small business subcontracting plan. As prescribed in 19.708(b), insert the following clause: Small Business Subcontracting Plan (OCT 2010) (a) This clause does not apply to small business...

  7. 25 CFR 276.16 - Subgrants and subcontracts to non-profit organizations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Subgrants and subcontracts to non-profit organizations. 276.16 Section 276.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF... Subgrants and subcontracts to non-profit organizations. The uniform administrative requirements in this part...

  8. Companies Participating in the Department of Defense Subcontracting Program. First Quarter, Fiscal Year 1995.

    DTIC Science & Technology

    1995-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has a section for each of the...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and disadvantaged businesses. The

  9. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... hot cell services. 952.225-70 Section 952.225-70 Federal Acquisition Regulations System DEPARTMENT OF....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  10. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  11. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  12. 78 FR 17671 - Federal Acquisition Regulation; Submission for OMB Review; Summary Subcontract Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for... for DOD and NASA) of subcontracts awarded by prime and subcontractors for a specific Federal... data from Alaskan Native Corporations and Indian Tribe concerns under a subcontracting plan with the...

  13. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use...

  14. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  15. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  16. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  17. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  18. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  19. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  20. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  1. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  2. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    DTIC Science & Technology

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  3. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  4. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  5. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  6. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  7. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  8. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  9. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  10. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  11. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  12. 48 CFR 212.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 212.504 Section 212.504 Federal... PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  13. Department of Defense Companies Participating in the Department of Defense Subcontracting Program, First Quarter Fiscal Year 1994

    DTIC Science & Technology

    1994-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has section for each of the Military...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and small disadvantaged businesses. The

  14. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  15. Apollo(R) Thin Film Process Development: Final Technical Report, April 1998 - April 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, D.W.

    2002-10-01

    BP Solar first started investigative work on CdTe photovoltaics in 1986. The module product name chosen for the CdTe devices is Apollo. The deposition method chosen was electrochemical deposition due to its simplicity and good control of stoichiometric composition. The window layer used is CdS, produced from a chemical-bath deposition. Initial work focused on increasing photovoltaic cell size from a few mm2 to 900 cm2. At BP Solar's Fairfield plant, work is focused on increasing semiconductor deposition to 1 m2. The primary objective of this subcontract is to establish the conditions required for the efficient plating of CdS/CdTe on large-area,more » transparent conducting tin-oxide-coated glass superstrate. The initial phase concentrates on superstrate sizes up to 0.55 m2. Later phases will include work on 0.94 m2 superstrates. The tasks in this subcontract have been split into four main categories: (1) CdS and CdTe film studies; (2) Enhanced laser processing; (3) Outdoor testing program for the Apollo module; and (4) Production waste abatement and closed loop study.« less

  16. 40 CFR 35.4240 - What provisions must my group's TAG contractor comply with if it subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false What provisions must my group's TAG contractor comply with if it subcontracts? 35.4240 Section 35.4240 Protection of Environment ENVIRONMENTAL... with if it subcontracts? A TAG contractor must comply with the following provisions when awarding...

  17. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  18. 22 CFR 228.37 - Nationality of employees under contracts or subcontracts for services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... subcontracts for services. 228.37 Section 228.37 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES ON SOURCE, ORIGIN AND NATIONALITY FOR COMMODITIES AND SERVICES FINANCED BY USAID Conditions Governing... contracts or subcontracts for services. (a) The rules set forth in §§ 228.31 through 228.36 do not apply to...

  19. 48 CFR 12.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 12.504 Section 12.504 Federal Acquisition... Applicability of Certain Laws to the Acquisition of Commercial Items and Commercially Available Off-The-Shelf Items 12.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  20. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  1. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  2. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  3. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  4. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  5. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  6. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  7. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  8. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  9. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    Terrell, Stefanie M.; Richards, Brad W.

    2018-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  10. ALPHA SMP SYSTEM(S) Final Report CRADA No. TC-1404-97

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seager, M.; Beaudet, T.

    Within the scope of this subcontract, Digital Equipment Corporation (DIGITAL) and the University, through the Lawrence Livermore National Laboratory (LLNL), engaged in joint research and development activities of mutual interest and benefit. The primary objectives of these activities were, for LLNL to improve its capability to perform its mission, and for DIGITAL to develop technical capability complimentary to this mission. The collaborative activities had direct manpower investments by DIGITAL and LLNL. The project was divided into four areas of concern, which were handled concurrently. These areas included Gang Scheduling, Numerical Methods, Applications Development and Code Development Tools.

  11. 2 CFR 801.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 801.220 Section 801.220 Grants and... DEBARMENT AND SUSPENSION Covered Transactions § 801.220 What contracts and subcontracts, in addition to...

  12. 42 CFR 434.6 - General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...

  13. Opto-mechanical support services. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This subcontract was for Optomec`c support of the Los Alamos National Laboratory`s (LANL`s) Group MEE-12 in the technical specialty area of opto-mechanical design, engineering and fabrication. Two individual tasks were defined by MEE-12 and completed by Optomec personnel. Edward J. Yavornik acted as Principal Investigator on the Wire and Fluorescent Fiber Offset Grid (WAFFOG) for the Neutral Particle Beam (NPB) GTA (Ground Test Accelerator) Experiment, and Thomas Swann acted as Principal Investigator on the ESS-7 Photometers Project. Some hardware was procured/fabricated for the ESS-7 Photometer task, however, most of the work consisted of design and engineering support resulting in drawingsmore » and specifications which were prepared by MEE-12 personnel. There were no technical papers or patents generated by Optomec personnel as a result of this work, and all work defined in the contract was completed.« less

  14. Final Data Report: P- and S-Wave Velocity Logging Borings C4993, C4996, and C4997 Part A: Interval Logs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steller, Robert; Diehl, John

    2007-02-01

    Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohaymore » serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.« less

  15. Final Data Report: P- and S-Wave Velocity Logging Borings C4993, C4996, and C4997 Part B: Overall Logs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diehl, John; Steller, Robert

    2007-03-20

    Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohaymore » serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.« less

  16. Report on Contractual Flow Down Provisions in the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS)

    DTIC Science & Technology

    2017-11-01

    Richard Ginman, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts...publication, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts, http...FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts. Arlington, VA: National Defense Industrial Association NDIA), 2016. http

  17. 48 CFR 44.305-2 - Notification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approved. The system approval notification shall identify the class or classes of subcontracts requiring... has revealed sufficient weaknesses in a particular area of subcontracting to warrant special attention...

  18. Final Report: Sintered CZTS Nanoparticle Solar Cells on Metal Foil; July 26, 2011 - July 25, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leidholm, C.; Hotz, C.; Breeze, A.

    2012-09-01

    This is the final report covering 12 months of this subcontract for research on high-efficiency copper zinc tin sulfide (CZTS)-based thin-film solar cells on flexible metal foil. Each of the first three quarters of the subcontract has been detailed in quarterly reports. In this final report highlights of the first three quarters will be provided and details will be given of the final quarter of the subcontract.

  19. 48 CFR 244.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent to Subcontracts 244.202-2 Considerations. (a) Where other than lowest price is the basis for subcontractor selection, has...

  20. Safety Climate and Occupational Stress According to Occupational Accidents Experience and Employment Type in Shipbuilding Industry of Korea.

    PubMed

    Kim, Kyung Woo; Park, Sung Jin; Lim, Hae Sun; Cho, Hm Hak

    2017-09-01

    Safety climate and occupational stress are related with occupational accident. The present study tried to identify the differences in safety climate and occupational stress according to occupational accidents experience and employment type (e.g., direct workers and subcontract workers). In this study, we conducted a survey using safety climate scale and Korean Occupational Stress Scale and classified the participants into four groups: direct workers working for accident-free departments, direct workers working for accident departments, subcontract workers working for accident-free departments, and subcontract workers working for accident departments for 2 years within the same workplace in the shipbuilding industry. The direct workers and subcontract workers showed diverse results in subscales of safety climate and occupational stress. This result is supported by existing studies; however, further study is necessary for more supporting evidence and elaborative methodological approach. The necessity of management for safety climate and psychosocial factor such as occupational stress for both direct workers and subcontract workers as a whole is suggested by this study.

  1. 77 FR 14016 - General Services Administration Acquisition Regulation; Preparation, Submission, and Negotiation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ..., Submission, and Negotiation of Subcontracting Plans; Correction AGENCY: General Services Administration (GSA..., Preparation, Submission, and Negotiation of Subcontracting Plans; Correction. Correction In the information...

  2. 48 CFR 3019.705 - Responsibilities for the contracting officer under the subcontracting program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705...

  3. 48 CFR 19.701 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-based system for small business subcontracting program reporting. Failure to make a good faith effort to... planned subcontracting in support of the specific contract, except that indirect costs incurred for common...

  4. Several organic parameters on underlying hazardous constituents list can not be measured at the universal treatment standards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, H.C.

    1998-07-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) has several permitted treatment, storage and disposal facilities. The INEEL Sample Management Office (SMO) conducts all analysis subcontracting activities for Department of Energy Environmental Management programs at the INEEL. In this role, the INEEL SMO has had the opportunity to subcontract the analyses of various wastes (including ash from an interim status incinerator) requesting a target analyte list equivalent to the constituents listed in 40 Code of Federal Regulations. These analyses are required to ensure that treated wastes do not contain underlying hazardous constituents (UHC) at concentrations greater than the universal treatmentmore » standards (UTS) prior to land disposal. The INEEL SMO has conducted a good-faith effort by negotiating with several commercial laboratories to identify the lowest possible quantitation and detection limits that can be achieved for the organic UHC analytes. The results of this negotiating effort has been the discovery that no single laboratory (currently under subcontract with the INEEL SMO) can achieve a detection level that is within an order of magnitude of the UTS for all organic parameters on a clean sample matrix (e.g., sand). This does not mean that there is no laboratory that can achieve the order of magnitude requirements for all organic UHCs on a clean sample matrix. The negotiations held to date indicate that it is likely that no laboratory can achieve the order of magnitude requirements for a difficult sample matrix (e.g., an incinerator ash). The authors suggest that the regulation needs to be revised to address the disparity between what is achievable in the laboratory and the regulatory levels required by the UTS.« less

  5. SBA’s Progress in Implementing the Public Law 95-507 Subcontracting and Surety Bond Waiver Provisions has been Limited.

    DTIC Science & Technology

    1981-09-18

    IMP~mnl~~~U LayL 95-507 SubcontractjfQ fd Surety Bond Waiver Provisiolns 3as8en Limted. The Small Business Administration, working with a...Presidential Advisory Committee has no fll ipleetd the small business sub- L ~ 3 cowtractlgpoiin The committee has fo- cused on obtaining subcontracts from...GAO recommends changes SBA should make to nmimize subcontracting opportunities for small businesses . Also, GAO sugssthat the provision for 2 years

  6. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552..., historical performance and significant achievements in placing subcontracts for the same or similar products...

  7. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  8. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  9. 48 CFR 2019.705 - Responsibilities of the contracting officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System NUCLEAR REGULATORY COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705...

  10. 48 CFR 49.108-4 - Authorization for subcontract settlements without approval or ratification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-4 Authorization for subcontract settlements without approval or ratification. (a)(1) The...

  11. 48 CFR 970.4102-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE to acquire utility service(s) by subcontract, i.e., what the benefits are, such as economic..., shall be applied to a subcontract level acquisition for furnishing utility services to a facility owned...

  12. 48 CFR 319.705 - Responsibilities of the Contracting Officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 319.705...

  13. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  14. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  15. 48 CFR 227.304-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracts 227.304-1 General. Interim and final invention reports and notification of all subcontracts for... of Inventions and Subcontracts. [56 FR 36389, July 31, 1991, as amended at 57 FR 53600, Nov. 12, 1992] ...

  16. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.202...) Character and difficulty of subcontracting, including selection, placement, and management of subcontracts...

  17. 48 CFR 952.250-70 - Nuclear hazards indemnity agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... obligation under this contract and shall be unaffected by the death, disability, or termination of existence...) Inclusion in subcontracts. The Contractor shall insert this clause in any subcontract which may involve the...

  18. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  19. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  20. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  1. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  2. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  3. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  4. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  5. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  6. 14 CFR 1274.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Subcontracting dollar threshold. The dollar amount of the cooperative agreement subject to the small business subcontracting policies (includes small business, veteran-owned small business, service-disabled veteran-owned small business, historically underutilized small business, small disadvantaged business, women-owned...

  7. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... feasible units, as appropriate, to facilitate small business participation; (ii) Conducting market research... its subcontracting plan. (e) CMR Responsibilities. Commercial Market Representatives (CMRs) are SBA's... other resources and tools; (4) Counseling small business concerns on how to market themselves to large...

  8. 48 CFR 2944.202 - Contracting officer's evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contracting officer's evaluation. 2944.202 Section 2944.202 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent To Subcontract 2944.202 Contracting officer's...

  9. 48 CFR 44.202-1 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 44.202-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... notification and supporting data to ensure that the proposed subcontract is appropriate for the risks involved... during negotiations, the contracting officer shall identify those subcontracts in paragraph (j) of the...

  10. 13 CFR 121.410 - What are the size standards for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Size Eligibility Requirements for Government Procurement § 121.410 What are the size standards for SBA... Small Business Act, a concern is small for subcontracts which relate to Government procurements if it...

  11. Subcontracting Opportunities with DoD Major Prime Contractors

    DTIC Science & Technology

    1996-06-01

    The Department of Defense (DoD) offers two markets for small business and small disadvantaged business seeking defense contracting and defense...opportunities. The publication exclusively addresses the defense subcontracting opportunities market. The DoD encourages small business and small disadvantaged

  12. 48 CFR 44.301 - Objective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Objective. 44.301 Section... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.301 Objective. The objective of... which the contractor spends Government funds and complies with Government policy when subcontracting...

  13. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...

  14. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  15. 48 CFR 1419.705-2 - Determining the need for a subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Determining the need for a subcontracting plan. 1419.705-2 Section 1419.705-2 Federal Acquisition Regulations System DEPARTMENT OF THE... recommendations offered. ...

  16. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  17. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  18. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  19. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  20. NREL Photovoltaic Program FY 1995 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report summarizes the in-house and subcontracted R&D activities from Oct. 1994 through Sept. 1995; their objectives are to conduct basic, applied, and engineering research, manage subcontracted R&D projects, perform research complementary to subcontracted work, develop and maintain state-of-the-art measurement and device capabilities, develop PV manufacturing technology and modules, transfer results to industry, and evolve viable partnerships for PV systems and market development. The research activities are grouped into 5 sections: crystalline Si and advanced devices, thin-film PV, PV manufacturing, PV module and system performance and engineering, and PV applications and market development.

  1. Industrial Fuel Gas Demonstration Plant Program. Bid packages for materials (Deliverable No. 28)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-01-01

    Fixed-price supply type bid packages for materials and/or service essentially are comprised of two parts, namely: (1) a technical requisition of the material, equipment, or service to be supplied; and (2) commercial and legal requirements, normally referred to as terms and conditions. Requisitions, providing technical requirements, for all equipment items identified for the Industrial Fuel Gas Demonstration Plant may be found in the 12 volumes of the Demonstration Plant Mechanical Design. The requisitions have been included within separate sections of the design report, sorted by appropriate plant unit. Combined with any General Notes Requisition and the necessary FWEC Job Standards,more » these various item requisitions provide all technical information for the prospective vendor to furnish his bid. The terms and conditions (boiler plate) to be included in the bid package identify all the contractual requirements which will be imposed upon the bidder. These requirements cover the conditions he must meet to bid on the particular item as well as the clauses to be included within the eventual purchase order/subcontract. A typical package of such terms and conditions is included.« less

  2. 48 CFR 1652.244-70 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. 1652.244-70 Section 1652.244-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CLAUSES AND FORMS CONTRACT CLAUSES Texts of FEHBP Clauses...

  3. 42 CFR 422.202 - Participation procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... procedures. (a) Notice and appeal rights. An MA organization that operates a coordinated care plan or network... of groups of physicians, through reasonable procedures that include the following: (1) Written notice... guidelines. (c) Subcontracted groups. An MA organization that operates an MA plan through subcontracted...

  4. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  5. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  6. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  7. 76 FR 74749 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... amend its regulations to implement provisions of the Small Business Jobs Act of 2010 (Jobs Act... used in preparing its bid or proposal during contract performance. SBA also proposed to amend its... and evaluating small business subcontracting plan performance. SBA also proposed to clarify which...

  8. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 30.001...

  9. 48 CFR 2919.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...

  10. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS) rules and regulations for which a contractor or subcontractor— (1) Used one cost accounting practice to...

  11. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  12. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  13. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  14. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  15. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  16. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  17. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  18. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  19. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  20. 48 CFR 1252.217-74 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracts. 1252.217-74 Section 1252.217-74 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CLAUSES AND FORMS...) Nothing contained in the contract shall be construed as creating any contractual relationship between any...

  1. 14 CFR § 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  2. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  3. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  4. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  5. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  6. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other resources and tools; (4) Counseling small business concerns on how to market themselves to large... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Subcontracting assistance. 125.3 Section 125.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION GOVERNMENT CONTRACTING PROGRAMS...

  7. Hardware Development Process for Human Research Facility Applications

    NASA Technical Reports Server (NTRS)

    Bauer, Liz

    2000-01-01

    The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

  8. Subcontracted activities related to TES for building heating and cooling

    NASA Technical Reports Server (NTRS)

    Martin, J.

    1980-01-01

    The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.

  9. 29 CFR 4.114 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Covered Contracts Generally § 4.114 Subcontracts. (a) “Contractor” as including “subcontractor... contractor undertakes a contract subject to the Act, the contractor agrees to assume the obligation that the...

  10. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  11. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  12. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  13. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  14. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  15. 48 CFR 49.108-7 - Government assistance in settling subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government assistance in settling subcontracts. 49.108-7 Section 49.108-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-7 Government assistance in...

  16. 48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 49.107 Section 49.107 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49...

  17. 48 CFR 12.500 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items and... law that are not applicable to— (1) Contracts for the acquisition of commercial items; (2) Subcontracts, at any tier, for the acquisition of commercial items; and (3) Contracts and subcontracts, at any...

  18. 77 FR 29983 - Federal Acquisition Regulation; Information Collection; Subcontract Consent

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... performance of functions of the Federal Acquisition Regulation (FAR), and whether it will have practical... The objective of consent to subcontract, as discussed in FAR Part 44, is to evaluate the efficiency and effectiveness with which the contractor spends Government funds, and complies with Government...

  19. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  20. 48 CFR 52.219-26 - Small Disadvantaged Business Participation Program-Incentive Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT CLAUSES Text of Provisions and Clauses 52.219-26 Small Disadvantaged Business Participation... the following: Small Disadvantaged Business Participation Program—Incentive Subcontracting (OCT 2000... its offer to try to award a certain amount to small disadvantaged business concerns in the North...

  1. 41 CFR 51-4.4 - Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Subcontracting. 51-4.4 Section 51-4.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... both with efficient performance in furnishing commodities or services under the JWOD Act and maximizing...

  2. 48 CFR 9.104-3 - Application of standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the... requires a subcontracting plan pursuant to Subpart 19.7, The Small Business Subcontracting Program, the... prospective contractor's responsibility. (d)(1) Small business concerns. Upon making a determination of...

  3. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  4. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  5. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  6. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  7. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  8. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  9. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  10. Evaluating technology service options.

    PubMed

    Blumberg, D F

    1997-05-01

    Four service and support options are available to healthcare organizations for maintaining their growth arsenals of medical and information technology. These options include maintaining and servicing all equipment using a facility-based biomedical engineering and MIS service department; using a combination of facility-based service and subcontracted service; expanding facility-based biomedical and MIS service departments to provide service to other healthcare organizations to achieve economies of scale; and outsourcing all maintenance, repair, and technical support services. Independent service companies and original equipment manufacturers (OEMs) are offering healthcare organizations a wider array of service and support capabilities than ever before. However, some health systems have successfully developed their own independent service organizations to take care of their own--and other healthcare organizations'--service and support needs.

  11. 48 CFR 52.219-16 - Liquidated Damages-Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following clause: Liquidated Damages—Subcontracting Plan (JAN 1999) (a) Failure to make a good faith effort... has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have...

  12. 48 CFR 970.1907 - Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Business, Small Disadvantaged Business and Woman-Owned Small Business Concerns. 970.1907 Section 970.1907... MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907 Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

  13. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and subcontract incentives, fees, and profits associated with the increased or decreased costs to the... increase or decrease in contract and subcontracts incentives, fees, and profits associated with the... desirable and not detrimental to the Government and is, therefore, not subject to the no increased cost...

  14. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  15. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  16. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... economic development of resources in Burma. 537.410 Section 537.410 Money and Finance: Treasury Regulations... BURMESE SANCTIONS REGULATIONS Interpretations § 537.410 Contracts and subcontracts regarding economic... supervision and guarantee of another person's performance of a contract that includes the economic development...

  17. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  18. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  19. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  20. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  1. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  2. 48 CFR 49.108-8 - Assignment of rights under subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Assignment of rights under subcontracts. 49.108-8 Section 49.108-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-8 Assignment of rights under...

  3. 48 CFR 1449.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 1449.107 Section 1449.107 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1449...

  4. 48 CFR 44.400 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 44.400 Scope... required to apply to any subcontractors that are furnishing commercial items or commercial components in accordance with Section 8002(b)(2) of Public Law 103-355 and Section 826 of Public Law 110-181 (10 U.S.C...

  5. 48 CFR 252.219-7003 - Small business subcontracting plan (DoD contracts).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7003 Small business subcontracting plan (DoD contracts). As prescribed in 219.708(b)(1)(A), use the following clause: Small Business...

  6. 77 FR 44047 - Federal Acquisition Regulation; Reporting Executive Compensation and First-Tier Subcontract Awards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... Compensation B. Definitions C. Thresholds D. Paperwork Burden E. Applicability F. Subcontract Award Data G... definition of ``first- tier subcontractor.'' Comment: A number of respondents believed that executive... technologies and ideas, and increase the Government's costs by reducing competition. These respondents also...

  7. 77 FR 56709 - Proposed Information Collection (VA Subcontracting Report for Service Disabled Veteran-Owned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ..., Federal agencies are required to publish notice in the Federal Register concerning each proposed... response to the notice. This notice solicits comments on information needed to collect information from subcontractors to compare information obtained from subcontracting plans submitted by prime contractors in order...

  8. 25 CFR 900.136 - Do tribal employment rights ordinances apply to construction contracts and subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Do tribal employment rights ordinances apply to... OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER... rights ordinances apply to construction contracts and subcontracts? Yes. Tribal employment rights...

  9. 48 CFR 752.226-2 - Subcontracting with disadvantaged enterprises.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management and daily business are controlled by one or more such individuals. (2) Owned by socially and... disadvantaged enterprises. 752.226-2 Section 752.226-2 Federal Acquisition Regulations System AGENCY FOR... Clauses 752.226-2 Subcontracting with disadvantaged enterprises. As prescribed in 726.7007, insert the...

  10. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  11. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  12. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  13. 48 CFR 52.209-6 - Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Protecting the Government....209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. As prescribed in 9.409, insert the following clause: Protecting the...

  14. Archived Appendices | NREL

    Science.gov Websites

    subcontract or NREL Procurement. Appendix B-1 (07/11/14) Standard Terms and Conditions for (1) Cost Sharing , (2) Cost Reimbursement, and (3) Cost Plus Fixed Fee. Appendix B-2 (07/11/14) Standard Terms and Conditions for Cost Type Subcontracts with Educational Institutions Appendix B-10 (07/11/14) Standard Terms

  15. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  16. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  17. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  18. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  19. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  20. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  1. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  2. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  3. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  4. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  5. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  6. 13 CFR 121.411 - What are the size procedures for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the size procedures for SBA's Section 8(d) Subcontracting Program? 121.411 Section 121.411 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and Standards...

  7. 48 CFR 52.232-27 - Prompt payment for construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the... include such clauses in their subcontracts with each lower-tier subcontractor or supplier. (d) Subcontract... impair the right of the Contractor or a subcontractor at any tier to negotiate, and to include in their...

  8. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  9. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  10. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  11. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  12. Bureaucratic versus Craft Administration: The Relationship of Market Structure to the Construction Firm.

    ERIC Educational Resources Information Center

    Eccles, Robert G.

    1981-01-01

    Examines the factors that influence subcontracting and type of management in the construction industry. Argues that subcontracting is explained by a construction firm's size, complexity, and market extent, and that management type results from a firm's size and role in the production process and from census classification problems. (Author/RW)

  13. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  14. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  15. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  16. 48 CFR 19.707 - The Small Business Administration's role in carrying out the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... nature; and (4) Evaluate compliance with subcontracting plans, either on a contract-by-contract basis, or...

  17. 77 FR 70210 - Agency Information Collection (VA Subcontracting Report for Service Disabled Veteran-owned Small...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Subcontracting Report for Service Disabled Veteran-owned Small Business and Veteran-owned Small Business Concerns) Activities Under OMB Review AGENCY: Office of Small and Disadvantaged Business Utilization, Department of... U.S.C. 3501-3521), this notice announces that the Office of Small and Disadvantaged Business...

  18. Shadow Labor: Work and Wages among Immigrant Hispanic Women in Durham, North Carolina.

    PubMed

    Flippen, Chenoa A

    2016-07-01

    Drawing on data collected in Durham, NC, this paper examines the forces shaping the labor supply and wages of immigrant Hispanic women in new destinations. The analysis evaluates the role of human capital and immigration characteristics (including legal status), family structure, and immigrant-specific labor market conditions, such as subcontracting, in shaping labor market outcomes. Findings indicate that the main determinants of labor supply among immigrant Hispanic women in Durham relate to family structure, with human capital playing a relatively minor role. Important variation is observed, however, in the degree of work-family conflict across occupations. For wages, human capital and immigration characteristics (including documentation) are more determinant than family structure. Results highlight the extremely precarious position of immigrant Hispanic women in Durham's low wage labor market, and multiple, overlapping sources of disadvantage, particularly relating to legal status and family structure.

  19. Shadow Labor: Work and Wages among Immigrant Hispanic Women in Durham, North Carolina

    PubMed Central

    Flippen, Chenoa A.

    2017-01-01

    Drawing on data collected in Durham, NC, this paper examines the forces shaping the labor supply and wages of immigrant Hispanic women in new destinations. The analysis evaluates the role of human capital and immigration characteristics (including legal status), family structure, and immigrant-specific labor market conditions, such as subcontracting, in shaping labor market outcomes. Findings indicate that the main determinants of labor supply among immigrant Hispanic women in Durham relate to family structure, with human capital playing a relatively minor role. Important variation is observed, however, in the degree of work-family conflict across occupations. For wages, human capital and immigration characteristics (including documentation) are more determinant than family structure. Results highlight the extremely precarious position of immigrant Hispanic women in Durham’s low wage labor market, and multiple, overlapping sources of disadvantage, particularly relating to legal status and family structure. PMID:28603290

  20. 48 CFR 52.215-22 - Limitations on Pass-Through Charges-Identification of Subcontract Effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The offeror's proposal shall exclude excessive pass-through charges. (c) Performance of work by the..., under the contract, task order, or delivery order. (2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery...

  1. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  2. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  3. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  4. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  5. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  6. 48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...

  7. 13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...

  8. 48 CFR 13.005 - List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition threshold. 13.005 Section 13.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES...

  9. Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development. volume 3; Program Cost estimates

    NASA Technical Reports Server (NTRS)

    McCurry, J. B.

    1995-01-01

    The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

  10. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  11. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  12. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  13. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  14. NREL photovoltaic program FY 1997 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less

  15. Simulated Coal Gas MCFC Power Plant System Verification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scroppo, J.A.

    1998-09-01

    Technical Report September 1998 This report was prepared as an account of work sponsored by an agency of the US Government. Neither the US Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owed rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoringmore » by the US Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the US Government or any agency thereof. This is the Technical Progress Report covering September 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate. Unocal continued maintenance of the 250-kW demonstration power plant. Bid packages for plant dismantling have been prepared and sent out to appropriate contractors for their proposals. A work plan and estimate for dismantling and packaging the plant for shipment has been prepared by Unocal. The plan has been reviewed by M-C Power and Bechtel with modifications made where appropriate. Unocal has obtained vendor qualifications for possible bidders who are acceptable to M-C Power. M-C Power has revised the bid packages to incorporate the modifications. Disassembly activities will proceed upon review of the proposals and subsequent releasing of a disassembly sub-contract. Shipment of the BOP from Unocal to M-C Power is expected to take place during December 1998.« less

  16. 2 CFR 1326.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1326.220 Section 1326.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  17. 2 CFR 1200.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1200.220 Section 1200.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  18. Thin-film photovoltaic partnership -- Apollo{reg{underscore}sign} thin film process development: Phase 1 Technical Report, May 1998--April 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, D.W.; Skinner, D.E.

    1999-10-26

    The objective of this Phase 1 subcontract was to establish an efficient production plating system capable of depositing thin-film CdTe and CdS on substrates up to 0.55 m{sup 2}. This baseline would then be used to build on and extend deposition areas to 0.94 m{sup 2} in the next two phases. The following achievements have been demonstrated: {sm{underscore}bullet} Chemical-bath deposition of CdS and electrochemical deposition of CdTe was demonstrated on 0.55 m{sup 2} substrates. The films were characterized using optical and electrical techniques, to increase the understanding of the materials and aid in loss analysis. {sm{underscore}bullet} A stand-alone, prototype CdTemore » reaction tank was built and commissioned, allowing the BP Solar team to perform full-scale trials as part of this subcontract. {sm{underscore}bullet} BP Solar installed two outdoor systems for reliability and performance testing. {sm{underscore}bullet} The 2-kW, ground-mounted, grid-connected system contains seventy-two 0.43-m{sup 2} Apollo{reg{underscore}sign} module interconnects. {sm{underscore}bullet} Two modules have been supplied to NREL for evaluation on their Performance and Energy Rating Test bed (PERT) for kWh evaluation. {sm{underscore}bullet} BP Solar further characterized the process waste stream with the aim to close-loop the system. Currently, various pieces of equipment are being investigated for suitability of particle and total organic compound removal.« less

  19. 2 CFR 1125.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1125.220 Section 1125.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  20. 2 CFR 1400.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1400.220 Section 1400.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  1. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... determine whether a Participant is small for a particular 8(a) BD subcontract? (a) Self certification by... agency. The Participant also must submit a copy of its offer, including its self-certification as to size... nonmanufacturer rule to, 8(a) BD procurements. (b) Verification of size by SBA. Within 30 days of its receipt of a...

  2. Evaluation of Subcontract Price Proposals

    DTIC Science & Technology

    1990-04-09

    This is the final report on the Audit of the Evaluation of Subcontract Price Proposals. Comments on a draft of this report were considered in...preparing the final report. We made the audit from October 1987 through May 198% The initial objectives of the audit were to evaluate procedures used by...assist audit reports were used by procurement contracting officers in negotiating contract prices. During the audit , we expanded our objectives to

  3. Under pressure, out of control, or home alone? Reviewing research and policy debates on the occupational health and safety effects of outsourcing and home-based work.

    PubMed

    Quinlan, Michael; Bohle, Philip

    2008-01-01

    The practice of outsourcing or subcontracting of work has grown rapidly in most countries over the past two decades. Outsourcing, de-institutionalization, and a range of other practices have also resulted in a growth of home-based work. Home-based workers, even when not part of a subcontracting process, operate in an isolated situation remote from their employer and other workers. Do such work arrangements expose workers to greater risk of injury, illness, or assault? The authors reviewed international studies of the occupational health and safety (OHS) effects of subcontracting and home-based work undertaken over the past 20 years. Of the 25 studies analyzed, 92 percent found poorer OHS outcomes. The studies were examined for clues about the reasons for these negative outcomes. The authors also identified similarities and differences between subcontracting and home-based work. Despite the evidence of poor OHS outcomes, research into outsourcing has stalled in recent years. With notable exceptions, governments have taken little account of findings on these work arrangements in their laws and policies, in part because neoliberal ideas dominate national and global policy agendas. The authors examine policy challenges and regulatory responses and make suggestions for future research and policy interventions.

  4. Operating results and reinjection of Milos field in Greece

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hibara, Y.; Tahara, M.; Sakanashi, H.

    1989-01-01

    The Milos geothermal prospect located on one of the Cycladean islands of Greece represents a high temperature (320{sup 0}C), high silica content (1150 ppm) modified sea water resource. The program of development under taken by the Public Power Corporation (PPC) of Greece started with the drilling of a number of wells and has progressed to the installation of a pilot-style 2MW(e) condensing power plant which went on-line in December 1986. This plant has been provided by Mitsubishi Heavy Industries (MHI) under a contract with PPC. Geothermal South Pacific (GEOSPAC) was sub-contracted to MHI to provide technical and scientific assistance inmore » connection with reservoir related matters. The authors present the various studies and modification that were done to establish an acceptable method of plant operation and waste disposal.« less

  5. Poor Government Oversight of Anham and Its Subcontracting Procedures Allowed Questionable Costs To Go Undetected

    DTIC Science & Technology

    2011-07-30

    contractor purchasing system review of Anham. Management Comments and Audit Response The Defense Contract Mangement Agency and the U.S. Central... Introduction 1  Background 1  Government Agency Roles and Oversight Responsibilities 4  Objectives 7  Weak Government Oversight Resulted in Significant...Subcontracting Procedures Allowed Questionable Costs To Go Undetected SIGIR 11-022 July 30, 2011 Introduction Since 2003, the United States Government

  6. Final Technical Report: Sparse Grid Scenario Generation and Interior Algorithms for Stochastic Optimization in a Parallel Computing Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mehrotra, Sanjay

    2016-09-07

    The support from this grant resulted in seven published papers and a technical report. Two papers are published in SIAM J. on Optimization [87, 88]; two papers are published in IEEE Transactions on Power Systems [77, 78]; one paper is published in Smart Grid [79]; one paper is published in Computational Optimization and Applications [44] and one in INFORMS J. on Computing [67]). The works in [44, 67, 87, 88] were funded primarily by this DOE grant. The applied papers in [77, 78, 79] were also supported through a subcontract from the Argonne National Lab. We start by presenting ourmore » main research results on the scenario generation problem in Sections 1–2. We present our algorithmic results on interior point methods for convex optimization problems in Section 3. We describe a new ‘central’ cutting surface algorithm developed for solving large scale convex programming problems (as is the case with our proposed research) with semi-infinite number of constraints in Section 4. In Sections 5–6 we present our work on two application problems of interest to DOE.« less

  7. High Efficiency Thin Film CdTe and a-Si Based Solar Cells: Final Technical Report, 4 March 1998--15 October 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Compaan, A. D.; Deng, X.; Bohn, R. G.

    2003-10-01

    This is the final report covering about 42 months of this subcontract for research on high-efficiency CdTe-based thin-film solar cells and on high-efficiency a-Si-based thin-film solar cells. Phases I and II have been extensively covered in two Annual Reports. For this Final Report, highlights of the first two Phases will be provided and then detail will be given on the last year and a half of Phase III. The effort on CdTe-based materials is led by Prof. Compaan and emphasizes the use of sputter deposition of the semiconductor layers in the fabrication of CdS/CdTe cells. The effort on high-efficiency a-Simore » materials is led by Prof. Deng and emphasizes plasma-enhanced chemical vapor deposition for cell fabrication with major efforts on triple-junction devices.« less

  8. Wetland Biomass Production: emergent aquatic management options and evaluations. A final subcontract report. [Includes a bibliography containing 686 references on Typha from biological abstracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, D.C.; Dubbe, D.R.; Garver, E.G.

    1984-07-01

    The high yield potential and attractive chemical composition of Typha make it a particularly viable energy crop. The Minnesota research effort has demonstrated that total annual biomass yields equivalent to 30 dry tonnes/ha (13 tons/acre) are possible in planted stands. This compares with yields of total plant material between 9 and 16 dry tonnes/ha (4 to 7 tons/acre) in a typical Minnesota corn field. At least 50% of the Typha plant is comprised of a belowground rhizome system containing 40% starch and sugar. This high level of easily fermentable carbohydrate makes rhizomes an attractive feedstock for alcohol production. The abovegroundmore » portion of the plant is largely cellulose, and although it is not easily fermentable, it can be gasified or burned. This report is organized in a manner that focuses on the evaluation of the management options task. Results from stand management research performed at the University of Minnesota during 1982 and 1983 are integrated with findings from an extensive survey of relevant emergent aquatic plant research and utilization. These results and findings are then arranged in sections dealing with key steps and issues that need to be dealt with in the development of a managed emergent aquatic bio-energy system. A brief section evaluating the current status of rhizome harvesting is also included along with an indexed bibliography of the biology, ecology, and utilization of Typha which was completed with support from this SERI subcontract. 686 references, 11 figures, 17 tables.« less

  9. Association of Physical and Technical Activities With Partial Match Status in a Soccer Professional Team.

    PubMed

    Moalla, Wassim; Fessi, Mohamed Saieffedin; Makni, Emna; Dellal, Alexandre; Filetti, Cristoforo; Di Salvo, Valter; Chamari, Karim

    2018-06-01

    Moalla, W, Fessi, MS, Makni, E, Dellal, A, Filetti, C, Di Salvo, V, and Chamari, K. Association of physical and technical activities with partial match status in a soccer professional team. J Strength Cond Res 32(6): 1708-1714, 2018-The purpose of this study was to examine the association between physical and technical activities and partial match status (winning, drawing, or losing) in a professional soccer team over 2 seasons. Physical and technical activities of 52 official matches were collected and analyzed at each 15-minute interval, for each half (45 minutes), and full match (90 minutes) using a multiple-camera computerized tracking system. The results indicated that according to full match outcome: winning status was characterized by players covering more total distance (p ≤ 0.05) and low-intensity running (<14.4 km·h) (p ≤ 0.05), whereas, losing status induced more sprinting (≥25.2 km·h) (p < 0.01) and high-intensity running (≥19.8 km·h) (p ≤ 0.05). However, according to partial match status (i.e., 15 minutes and half time), players covered more distance for all running intensities while winning (p < 0.01). Technical match performance scores were not influenced by match status. In conclusion, the present study showed that the physical activities including high-intensity running and total distance covered were related to the match status, whereas technical activities were not. The overall outcome shows that higher physical activity was associated with winning partial match periods. This approach highlights the importance of physical fitness in soccer and may help coaches to better modulate players' roles and team tactical organization throughout the match.

  10. Amorphous silicon research. Final technical progress report, 1 August 1994--28 February 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guha, S

    1998-05-01

    This report describes the status and accomplishments of work performed under this subcontract by United Solar Systems. United Solar researchers explored several new deposition regimes/conditions to investigate their effect on material/device performance. To facilitate optimum ion bombardment during growth, a large parameter space involving chamber pressure, rf power, and hydrogen dilution were investigated. United Solar carried out a series of experiments using discharge modulation at various pulsed-plasma intervals to study the effect of Si-particle incorporation on solar cell performance. Hydrogen dilution during deposition is found to improve both the initial and stable performance of a-Si and a-SiGe alloy cells. Researchersmore » conducted a series of temperature-ramping experiments on samples prepared with high and low hydrogen dilutions to study the effect of hydrogen effusion on solar cell performance. Using an internal photoemission method, the electrical bandgap of a microcrystalline p layer used in high-efficiency solar cells was measured to be 1.6 eV. New measurement techniques were developed to evaluate the interface and bulk contributions of losses to solar cell performance. Researchers replaced hydrogen with deuterium and found deuterated amorphous silicon alloy solar cells exhibit reduced light-induced degradation. The incorporation of a microcrystalline n layer in a multijunction cell is seen to improve cell performance. United Solar achieved a world-record single-junction a-Si alloy stable cell efficiency of 9.2% with an active area of 0.25 cm{sup 2} grown with high hydrogen dilution. They also achieved a world-record triple-junction, stable, active-area cell efficiency of 13.0% with an active area of 0.25 cm{sup 2}.« less

  11. High-throughput manufacturing of thin-film CdS/CdTe photovoltaic modules. Annual subcontract report, 16 November 1994--15 November 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D.W.

    1997-02-01

    The objectives of this subcontract are to advance Solar Cells, Inc.`s (SCI`s) photovoltaic manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. Activities during the second year of the program concentrated on process development, equipment design and testing, quality assurance, and ES and H programs. These efforts broadly addressed the issues of the manufacturing process for producing thin-film monolithic CdS/CdTe photovoltaic modules.

  12. Improved Transparent Conducting Oxides for Photovoltaics: Final Research Report, 1 May 1999--31 December 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mason, T. O.; Chang, R. P. H.; Marks, T. J.

    2003-10-01

    This subcontract focused on next-generation transparent conducting oxides (TCOs) for improved PV performance. More specifically, there were two research foci: (1) improved Sn-based, n-type TCOs aimed at enhanced CdTe PV cell performance, and (2) novel Cu-based, p-type TCOs applicable to a variety of PV designs. The objective of the research under this subcontract was to identify, explore, evaluate, and develop future generations of photovoltaic technologies that can meet the long-term goal of producing low-cost electricity from sunlight.

  13. Status Report for Remediation Decision Support Project, Task 1, Activity 1.B – Physical and Hydraulic Properties Database and Interpretation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rockhold, Mark L.

    2008-09-26

    The objective of Activity 1.B of the Remediation Decision Support (RDS) Project is to compile all available physical and hydraulic property data for sediments from the Hanford Site, to port these data into the Hanford Environmental Information System (HEIS), and to make the data web-accessible to anyone on the Hanford Local Area Network via the so-called Virtual Library. In past years efforts were made by RDS project staff to compile all available physical and hydraulic property data for Hanford sediments and to transfer these data into SoilVision{reg_sign}, a commercial geotechnical software package designed for storing, analyzing, and manipulating soils data.more » Although SoilVision{reg_sign} has proven to be useful, its access and use restrictions have been recognized as a limitation to the effective use of the physical and hydraulic property databases by the broader group of potential users involved in Hanford waste site issues. In order to make these data more widely available and useable, a decision was made to port them to HEIS and to make them web-accessible via a Virtual Library module. In FY08 the objectives of Activity 1.B of the RDS Project were to: (1) ensure traceability and defensibility of all physical and hydraulic property data currently residing in the SoilVision{reg_sign} database maintained by PNNL, (2) transfer the physical and hydraulic property data from the Microsoft Access database files used by SoilVision{reg_sign} into HEIS, which has most recently been maintained by Fluor-Hanford, Inc., (3) develop a Virtual Library module for accessing these data from HEIS, and (4) write a User's Manual for the Virtual Library module. The development of the Virtual Library module was to be performed by a third party under subcontract to Fluor. The intent of these activities is to make the available physical and hydraulic property data more readily accessible and useable by technical staff and operable unit managers involved in waste site assessments and remedial action decisions for Hanford. This status report describes the history of this development effort and progress to date.« less

  14. Origins, Chronology, and Current Status of the National Research Center for Career and Technical Education: 1963-2012

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Stone, James R., III

    2013-01-01

    The National Research Center for Career and Technical Education (NRCCTE) had a unique status among federally funded research and development center in education. Its funding was authorized by the federal legislation for career and technical and administered by the Office of Vocational and Adult Education, not the Institute for Education Sciences.…

  15. High Throughput Manufacturing of Thin-Film CdTe Photovoltaic Materials; Final Subcontract Report, 16 November 1993-31 December 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D. W.

    1999-09-02

    This report describes work performed by Solar Cells, Inc. (SCI), during this Photovoltaic Manufacturing Technology (PVMaT) subcontract. Cadmium telluride (CdTe) is recognized as one of the leading materials for low-cost photovoltaic modules. SCI has developed this technology and is preparing to scale its pilot production capabilities to a multi-megawatt level. This four-phase PVMaT subcontract supports these efforts. The work was related to product definition, process definition, equipment engineering, and support programs development. In the area of product definition and demonstration, two products were specified and demonstrated-a grid-connected, frameless, high-voltage product that incorporates a pigtail potting design and a remote low-voltagemore » product that may be framed and may incorporate a junction box. SCI produced a 60.3-W thin-film CdTe module with total-area efficiency of 8.4%; SCI also improved module pass rate on the interim qualification test protocol from less than 20% to 100% as a result of work related to the subcontract. In the manufacturing process definition area, the multi-megawatt manufacturing process was defined, several of the key processes were demonstrated, and the process was refined and proven on a 100-kW pilot line that now operates as a 250-kW line. In the area of multi-megawatt manufacturing-line conceptual design review, SCI completed a conceptual layout of the multi-megawatt lines. The layout models the manufacturing line and predicts manufacturing costs. SCI projected an optimized capacity, two-shift/day operation of greater than 25 MW at a manufacturing cost of below $1.00/W.« less

  16. Design Concepts for Cooled Ceramic Composite Turbine Vane

    NASA Technical Reports Server (NTRS)

    Boyle, Robert J.; Parikh, Ankur H.; Nagpal, VInod K.

    2015-01-01

    The objective of this work was to develop design concepts for a cooled ceramic vane to be used in the first stage of the High Pressure Turbine(HPT). To insure that the design concepts were relevant to the gas turbine industry needs, Honeywell International Inc. was subcontracted to provide technical guidance for this work. The work performed under this contract can be divided into three broad categories. The first was an analysis of the cycle benefits arising from the higher temperature capability of Ceramic Matrix Composite(CMC) compared with conventional metallic vane materials. The second category was a series of structural analyses for variations in the internal configuration of first stage vane for the High Pressure Turbine(HPT) of a CF6 class commercial airline engine. The third category was analysis for a radial cooled turbine vanes for use in turboshaft engine applications. The size, shape and internal configuration of the turboshaft engine vanes were selected to investigate a cooling concept appropriate to small CMC vanes.

  17. Hydroacoustic propagation grids for the CTBT knowledge databaes BBN technical memorandum W1303

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Angell

    1998-05-01

    The Hydroacoustic Coverage Assessment Model (HydroCAM) has been used to develop components of the hydroacoustic knowledge database required by operational monitoring systems, particularly the US National Data Center (NDC). The database, which consists of travel time, amplitude correction and travel time standard deviation grids, is planned to support source location, discrimination and estimation functions of the monitoring network. The grids will also be used under the current BBN subcontract to support an analysis of the performance of the International Monitoring System (IMS) and national sensor systems. This report describes the format and contents of the hydroacoustic knowledgebase grids, and themore » procedures and model parameters used to generate these grids. Comparisons between the knowledge grids, measured data and other modeled results are presented to illustrate the strengths and weaknesses of the current approach. A recommended approach for augmenting the knowledge database with a database of expected spectral/waveform characteristics is provided in the final section of the report.« less

  18. Laboratory and Space Plasma Studies

    NASA Astrophysics Data System (ADS)

    Hyman, Ellis

    1996-08-01

    The work performed by Science Applications International Corporation (SAIC), encompasses a wide range of topics in experimental, computational, and analytical laboratory and space plasma physics. The accomplishments described in this report have been in support of the programs of the Laser Plasma Branch (Code 6730) and other segments of the Plasma Physics Division at the Naval Research Laboratory (NRL) and cover the period 27 September 1993 to August 1, 1996. SAIC's efforts have been supported by sub-contracts or consulting agreements with Pulse Sciences, Inc., Clark Richardson, and Biskup Consulting Engineers, Pharos Technical Enterprises, Plex Corporation, Cornell University, Stevens Institute of Technology, the University of Connecticut, Plasma Materials and Technologies, Inc., and GaSonics International, Inc. In the following discussions section we will describe each of the topics investigated and the results obtained. Much of the research work has resulted in journal publications and NRL Memorandum Reports in which the investigation is described in detail. These reports are included as Appendices to this Final Report.

  19. Solar project cost report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, H.J.

    1978-01-01

    This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less

  20. High throughput manufacturing of thin-film CdTe photovoltaic modules. Annual subcontract report, 16 November 1993--15 November 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D W

    1995-11-01

    This report describes work performed by Solar Cells, Inc. (SCI), under a 3-year subcontract to advance SCI`s PV manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. SCI will meet these objectives in three phases by designing, debugging, and operating a 20-MW/year, automated, continuous PV manufacturing line that produces 60-cm {times} 120-cm thin-film CdTe PV modules. This report describes tasks completed under Phase 1 of the US Department of Energy`s PV Manufacturing Technology program.

  1. The Department of the Navy Subcontracting Program Update

    DTIC Science & Technology

    2014-08-01

    calculaCon  of  single  FY   acCvity  at  the  contract  level   Tot   Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014   Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0

  2. Federal employees health benefits acquisition regulation: large provider agreements, subcontracts, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The Office of Personnel Management (OPM) is issuing this final regulation to amend the Federal Employees Health Benefits Acquisition Regulation (FEHBAR). It establishes requirements, including audit, for Federal Employees Health Benefits Program (FEHB) experience-rated carriers' Large Provider Agreements. It also modifies the dollar threshold for review of carriers' subcontract agreements; revises the definitions of Cost or Pricing Data and Experience-rate to reflect mental health parity requirements; updates the contract records retention requirement; updates the FEHB Clause Matrix; and conforms subpart and paragraph references to Federal Acquisition Regulation (FAR) revisions made since we last updated the FEHBAR.

  3. Black liquor gasification phase 2D final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohl, A.L.; Stewart, A.E.

    1988-06-01

    This report covers work conducted by Rockwell International under Amendment 5 to Subcontract STR/DOE-12 of Cooperative Agreement DE-AC-05-80CS40341 between St. Regis Corporation (now Champion International) and the Department of Energy (DOE). The work has been designated Phase 2D of the overall program to differentiate it from prior work under the same subcontract. The overall program is aimed at demonstrating the feasibility of and providing design data for the Rockwell process for gasifying Kraft black liquor. In this process, concentrated black liquor is converted into low-Btu fuel gas and reduced melt by reaction with air in a specially designed gasification reactor.

  4. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  5. An analysis of the technical status of high level radioactive waste and spent fuel management systems

    NASA Technical Reports Server (NTRS)

    English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.

    1977-01-01

    The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

  6. GeMS: Gemini Mcao System: current status and commissioning plans

    NASA Astrophysics Data System (ADS)

    Boccas, Maxime; Rigaut, François; Gratadour, Damien; d'Orgeville, Céline; Bec, Matthieu; Daruich, Felipe; Perez, Gabriel; Arriagada, Gustavo; Bombino, Stacy; Carter, Chris; Cavedoni, Chas; Collao, Fabian; Collins, Paul; Diaz, Pablo; Ebbers, Angelic; Galvez, Ramon; Gausachs, Gaston; Hardash, Steve; James, Eric; Karewicz, Stan; Lazo, Manuel; Maltes, Diego; Mouser, Ron; Rogers, Rolando; Rojas, Roberto; Sheehan, Michael; Trancho, Gelys; Vergara, Vicente; Vucina, Tomislav

    2008-07-01

    The Gemini Multi-Conjugate Adaptive Optics project was launched in April 1999 to become the Gemini South AO facility in Chile. The system includes 5 laser guide stars, 3 natural guide stars and 3 deformable mirrors optically conjugated at 0, 4.5 and 9km to achieve near-uniform atmospheric compensation over a 1 arc minute square field of view. Sub-contracted systems with vendors were started as early as October 2001 and were all delivered by July 2007, but for the 50W laser (due around September 2008). The in-house development began in January 2006, and is expected to be completed by the end of 2008 to continue with integration and testing (I&T) on the telescope. The on-sky commissioning phase is scheduled to start during the first half of 2009. In this general overview, we will first describe the status of each subsystem with their major requirements, risk areas and achieved performance. Next we will present our plan to complete the project by reviewing the remaining steps through I&T and commissioning on the telescope, both during day-time and at night-time. Finally, we will summarize some management activities like schedules, resources and conclude with some lessons learned.

  7. Basic and applied research program. Semiannual report, July-December 1978

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butler, B.L.

    1979-12-01

    The status of research projects in the Basic and Applied Research Program at SERI is presented for the semiannual period ending December 31, 1978. The five tasks in this program are grouped into Materials Research and Development, Materials Processing and Development, Photoconversion Research, Exploratory Research, and Energy Resource and Assessment and have been carried out by personnel in the Materials, Bio/Chemical Conversion, and Energy Resource and Assessment Branches. Subtask elements in the task areas include coatings and films, polymers, metallurgy and corrosion, optical materials, surfaces and interfaces in materials research and development; photochemistry, photoelectrochemistry, and photobiology in photoconversion; thin glassmore » mirror development, silver degradation of mirrors, hail resistance of thin glass, thin glass manufacturing, cellular glass development, and sorption by desiccants in materials processing and development; and thermoelectric energy conversion, desiccant cooling, photothermal degradation, and amorphous materials in exploratory research. For each task or subtask element, the overview, scope, goals, approach, apparatus and equipment, and supporting subcontracts are presented, as applicable, in addition to the status of the projects in each task or subtask. Listing of publications and reports authored by personnel associated with the Basic and Applied Research Program and prepared or published during 1978 are also included.« less

  8. A bill to provide for a study by the National Academy of Sciences on the technical policy decisions and technical personnel at the Federal Communications Commission.

    THOMAS, 111th Congress

    Sen. Snowe, Olympia J. [R-ME

    2010-02-25

    Senate - 02/25/2010 Read twice and referred to the Committee on Commerce, Science, and Transportation. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  9. TQM in a test environment

    NASA Technical Reports Server (NTRS)

    Chambers, Gary D.; King, Elizabeth A.; Oleson, Keith

    1992-01-01

    In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.

  10. Low-cost manufacturing of the point focus concentrating module and its key component, the Fresnel lens. Final subcontract report, 31 January 1991--6 May 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saifee, T.; Konnerth, A. III

    1991-11-01

    Solar Kinetics, Inc. (SKI) has been developing point-focus concentrating PV modules since 1986. SKI is currently in position to manufacture between 200 to 600 kilowatts annually of the current design by a combination of manual and semi-automated methods. This report reviews the current status of module manufacture and specifies the required approach to achieve a high-volume manufacturing capability and low cost. The approach taken will include process development concurrent with module design for automated manufacturing. The current effort reviews the major manufacturing costs and identifies components and processes whose improvements would produce the greatest effect on manufacturability and cost reduction.more » The Fresnel lens is one such key component. Investigating specific alternative manufacturing methods and sources has substantially reduced the lens costs and has exceeded the DOE cost-reduction goals. 15 refs.« less

  11. Report of foreign travel to Paris, France, June 1, 1990--June 12, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Jones, L.S.

    1990-07-01

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Central Waste Management Division, participated in a technology exchange program on French --- US low-level radioactive waste (LLW) management facility design, construction, and operation. Visits were made to the new French LLW disposal facility currently under construction, the Centre de Stockage de l'Aube (CSA), to the La Hague reprocessing facility to visit LLW conditioning and storage facilities, and to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM). A meeting was also held with representatives of the Agence National pour lamore » Gestion des Dechets Radioactifs (ANDRA) to discuss overall French and Oak Ridge LLW disposal facility development programs and to review the status of the efforts being conducted under the current subcontract with NUMATEC/Societe General pour les Techniques Nouvelles (SGN)/ANDRA.« less

  12. TQM in a test environment

    NASA Astrophysics Data System (ADS)

    Chambers, Gary D.; King, Elizabeth A.; Oleson, Keith

    1992-11-01

    In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.

  13. Goldman - Georgetown University | Division of Cancer Prevention

    Cancer.gov

    Principal Investigator: Radoslav (Rado) Goldman, PhDInstitution: Georgetown University, Washington, DC Subcontract Principal Investigator: Raja Mazumder, PhDInstitution: George Washington University |

  14. Metric Conversion in the Construction Industries--Technical Issues and Status.

    ERIC Educational Resources Information Center

    Milton, Hans J.; Berry, Sandra A.

    This Special Publication was prepared at the request of the Metric Symposium Planning Committee of the National Institute of Building Sciences (NIBS). It is intended to provide information on technical issues and status of metric conversion in the United States construction industries. It was made available to attendees at the NIBS Symposium on…

  15. The Correlates of Tracking Policy: Opportunity Hoarding, Status Competition, or a Technical-Functional Explanation?

    ERIC Educational Resources Information Center

    Kelly, Sean; Price, Heather

    2011-01-01

    In this analysis, the authors explore the relationship between the social context of high schools and school-to-school variation in tracking policies. The authors consider three explanations for the implementation of highly elaborated tracking systems: opportunity hoarding, status competition, and a technical-functional explanation. Building on…

  16. The Grid Analysis and Display System (GrADS)

    NASA Technical Reports Server (NTRS)

    Kinter, James L., III

    1994-01-01

    During the period 1 September 1993 - 31 August 1994, further development of the Grid Analysis and Display System (GrADS) was conducted at the Center for Ocean-Land-Atmosphere Studies (COLA) of the Institute of Global Environment and Society, Inc. (IGES) under subcontract 5555-31 from the University Space Research Association (USRA) administered by The Center of Excellence in Space Data and Information Sciences (CESDIS). This final report documents progress made under this subcontract and provides directions on how to access the software and documentation developed therein. A short description of GrADS is provided followed by summary of progress completed and a summary of the distribution of the software to date and the establishment of research collaborations.

  17. Two cases of methyl alcohol intoxication by sub-chronic inhalation and dermal exposure during aluminum CNC cutting in a small-sized subcontracted factory.

    PubMed

    Ryu, Jia; Lim, Key Hwan; Ryu, Dong-Ryeol; Lee, Hyang Woon; Yun, Ji Young; Kim, Seoung-Wook; Kim, Ji-Hoon; Jung-Choi, Kyunghee; Kim, Hyunjoo

    2016-01-01

    Methyl alcohol poisoning has been mainly reported in community. Two cases of methyl alcohol poisoning occurred in a small-sized subcontracted factory which manufactured smartphone parts in Korea. One young female patient presented with dyspnea and visual disturbance. Another young male patient presented with visual disturbance and myalgia. They treated with sodium bicarbonate infusion and hemodialysis for metabolic acidosis. In addition, he received ethyl alcohol per oral treatment. Her and his urinary methyl alcohol concentration was detected as 7.632 mg/L, 46.8 mg/L, respectively, although they were treated hemodialysis. Results of the working environment measurement showed that the concentration of methyl alcohol (1030.1-2220.5 ppm) in the air exceeded the time weighted average (200 ppm). They were diagnosed with optic neuropathy due to methyl alcohol poisoning and still have visual impairment. Workers who hired as dispatched employees in a small-sized subcontracted factory were exposed to high concentrations of methyl alcohol. The workplace had poor ventilation system. In addition, workers did not wear proper personal protect equipment. Working environment measurement and annual chekups for workers were not performed. They were in a blind spot to occupational safety and health. More attention is needed to protect vulnerable workers' health.

  18. Large-area triple-junction a-Si alloy production scaleup. Annual subcontract report, 17 March 1993--18 March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oswald, R.; Morris, J.

    1994-11-01

    The objective of this subcontract over its three-year duration is to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance and expand the Solarex commercial production capacity. Solarex shall meet these objectives by improving the deposition and quality of the transparent front contact, by optimizing the laser patterning process, scaling-up the semiconductor deposition process, improving the back contact deposition, scaling-up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 2 portion of this subcontract, Solarex focused on improving deposition of the front contact, investigating alternate feed stocks for the front contact,more » maximizing throughput and area utilization for all laser scribes, optimizing a-Si:H deposition equipment to achieve uniform deposition over large-areas, optimizing the triple-junction module fabrication process, evaluating the materials to deposit the rear contact, and optimizing the combination of isolation scribe and encapsulant to pass the wet high potential test. Progress is reported on the following: Front contact development; Laser scribe process development; Amorphous silicon based semiconductor deposition; Rear contact deposition process; Frit/bus/wire/frame; Materials handling; and Environmental test, yield and performance analysis.« less

  19. Loop-mediated isothermal amplification method for diagnosing Pneumocystis pneumonia in HIV-uninfected immunocompromised patients with pulmonary infiltrates.

    PubMed

    Nakashima, Kei; Aoshima, Masahiro; Ohkuni, Yoshihiro; Hoshino, Eri; Hashimoto, Kohei; Otsuka, Yoshihito

    2014-12-01

    Loop-mediated isothermal amplification (LAMP) is becoming an established nucleic acid amplification method offering rapid, accurate, and cost-effective diagnosis of infectious diseases. We retrospectively evaluated 78 consecutive HIV-uninfected patients who underwent LAMP method for diagnosing Pneumocystis pneumonia (PCP). Diagnosis of PCP was made by the detection of Pneumocystis jirovecii (P. jirovecii) with positive LAMP or conventional staining (CS) (Grocott methenamine silver staining or Diff-Quick™) on the basis of compatible clinical symptoms and radiologic findings. Additionally, we reviewed HIV-uninfected immunocompromised patients who underwent subcontract PCR as a historical control. LAMP was positive in 10 (90.9%) of 11 positive-CS patients. Among 13 negative-CS patients with positive LAMP, 11 (84.6%) had PCP, and the remaining 2 were categorized as having P. jirovecii colonization. LDH levels in negative-CS PCP were higher than in positive-CS PCP (p = 0.026). (1 → 3)-β-D-glucan levels in negative-CS PCP were lower than in positive-CS PCP (p = 0.011). The interval from symptom onset to diagnosis as PCP in LAMP group (3.45 ± 1.77 days; n = 22) was shorter than in subcontract PCR group (6.90 ± 2.28 days; n = 10; p < 0.001). As for patients without PCP, duration of unnecessary PCP treatment in LAMP group (2; 2-3 days; n = 10) was shorter than in subcontract PCR group (7; 7-12.25 days; n = 6; p = 0.003). LAMP showed higher sensitivity (95.4%) and positive predictive value (91.3%) than subcontract PCR did. Pneumocystis LAMP method is a sensitive and cost-effective diagnostic method and is easy to administer in general hospitals. In-house LAMP method would realize early diagnosis of PCP, resulting in improving PCP prognosis and reducing unnecessary PCP-specific treatment. Copyright © 2014 Japanese Society of Chemotherapy and The Japanese Association for Infectious Diseases. Published by Elsevier Ltd. All rights reserved.

  20. Vocational-Technical Microcomputer Applications in Michigan and Bordering States (Upper Midwest Region). A Status Report: Summer 1984.

    ERIC Educational Resources Information Center

    Harris, Richard; Obert, Deborah

    In summer 1984, a study was conducted to assess the status of microcomputer applications in the public vocational-technical facilities of Michigan, Indiana, Minnesota, Illinois, Ohio, and Wisconsin. Mailing lists provided by the vocational education divisions of each state department of education were used to survey 705 individuals regarding…

  1. Technical Writing: Past, Present, and Future.

    ERIC Educational Resources Information Center

    Mathes, J. C., Comp.; Pinelli, Thomas E., Comp.

    This compilation of papers addresses the history, present status, and trends of technical and related writing. The first of the eight papers surveys the present environment of the technical report and assesses the effectiveness of the technical report format of the National Aeronautics and Space Administration (NASA) in transmitting information.…

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saccomanno, G.

    ''Early Lung Cancer Detection in Uranium Miners with Abnormal Sputum Cytology'' was funded by the Department of Energy to monitor the health effects of radon exposure and/or cigarette smoke on uranium workers from the Colorado Plateau. The resulting Saccomanno Uranium Workers Archive and data base has been used as a source of information to prove eligibility for compensation under the Radiation Exposure Compensation Act and as the source of primary data tissue for a subcontract and other collaborations with outside investigators. The latter includes a study of radon exposure and lung cancer risk in a non-smoking cohort of uranium minersmore » (subcontract); a study of genetic markers for lung cancer susceptibility; and a study of {sup 210}Pb accumulation in the skull as a biomarker of radon exposure.« less

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holley, W A

    This report describes work performed under a subcontract to the National Renewable Energy Laboratory under the Photovoltaic Manufacturing Technology Project. The objectives of this subcontract are to (1) define the problem of yellowing/browning of EVA-based encapsulants; (2) determine probable mechanisms and the role of various parameters such as heat, UV exposure, module construction, EVA interfaces, and EVA thickness, in the browning of EVA-based encapsulants; (3) develop stabilization strategies for various module constructions to protect the encapsulant from degradative failure; (4) conduct laboratory, accelerated outdoor, and field testing of encapsulant, laminated test coupons, and full modules to demonstrate the functional adequacymore » of the stabilization strategies; and (5) implement these strategies. This report summarizes the accomplishments related to the above goals for the reporting period.« less

  4. The California spotted owl: a technical assessment of its current status

    Treesearch

    Jared Verner; Kevin S. McKelvey; Barry R. Noon; R. J. Gutierrez; Gordon I. Jr. Gould; Thomas W. Beck

    1992-01-01

    This report is based an the Final Repart submitted on May 8, 1992 by the Technical Assessment Team to the interagency Steering Committee for the California Spotted Owl Assessment. The 13 chapters cover the assessment of the current status of the California spotted owl, its biology and habitat use, and forests where the subspecies occurs in the Sierra Nevada and...

  5. 45 CFR 162.1402 - Standards for health care claim status transaction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Electronic Data Interchange Technical Report Type 3, April 2008, ASC X12N/005010X212E1. (Incorporated by... paragraph (a) of this section; and (2) The ASC X12 Standards for Electronic Data Interchange Technical Report Type 3—Health Care Claim Status Request and Response (276/277), August 2006, ASC X12N/005010X212...

  6. 45 CFR 162.1402 - Standards for health care claim status transaction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Electronic Data Interchange Technical Report Type 3, April 2008, ASC X12N/005010X212E1. (Incorporated by... paragraph (a) of this section; and (2) The ASC X12 Standards for Electronic Data Interchange Technical Report Type 3—Health Care Claim Status Request and Response (276/277), August 2006, ASC X12N/005010X212...

  7. 45 CFR 162.1402 - Standards for health care claim status transaction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Electronic Data Interchange Technical Report Type 3, April 2008, ASC X12N/005010X212E1. (Incorporated by... paragraph (a) of this section; and (2) The ASC X12 Standards for Electronic Data Interchange Technical Report Type 3—Health Care Claim Status Request and Response (276/277), August 2006, ASC X12N/005010X212...

  8. 45 CFR 162.1402 - Standards for health care claim status transaction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Electronic Data Interchange Technical Report Type 3, April 2008, ASC X12N/005010X212E1. (Incorporated by... paragraph (a) of this section; and (2) The ASC X12 Standards for Electronic Data Interchange Technical Report Type 3—Health Care Claim Status Request and Response (276/277), August 2006, ASC X12N/005010X212...

  9. The Effect of Socioeconomic Status and Gender on High School Student Perceptions about Career and Technical Education

    ERIC Educational Resources Information Center

    Chadwell, Briael Marie

    2016-01-01

    This quantitative study examines the perceptions of career and technical education (CTE) among high school students based on their socioeconomic status and gender, and the interaction between the two. The study used a convenience sample of 207 students from four coastal South Carolina high schools. The data was collected using the Image of…

  10. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...

  11. 48 CFR 44.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... purchasing system or performance is inadequate; (2) Close working relationships or ownership affiliations... subcontracting with small, veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged and women...

  12. Argonne National Laboratory technology transfer report, FY 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-11-01

    In 1985 Argonne established the Technology Transfer Center (TTC). As of the end of FY 1987, the TTC has a staff equivalent to four full-time professionals, two secretaries, and two student aides; FY 1987 ORTA funding was $220K. A network of technology transfer representatives provides windows into and out of Argonne's technical divisions on technology transfer matters. The TTC works very closely with the ARCH Develoment Corporation, a not-for-profit corporation set up to commercialize selected Argonne and University of Chicago patents. The goal of the Technology Transfer Center at Argonne is to transfer technology developed at Argonne to the domesticmore » private sector by whatever means is most effective. The strategies by which this is accomplished are numerous and the TTC is, in effect, conducting a number of experiments to determine the most effective strategies. These include cooperative RandD agreements, work-for-others contracts, subcontracting to industry, formation of joint ventures via ARCH, residencies by industry staff at Argonne and vice versa, patent licensing and, of course, conferences, workshops and visits by industry and to industry.« less

  13. Mobil Solar Energy Corporation thin EFG octagons. Final subcontract report, 1 April 1992--31 January 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalejs, J.P.

    1994-06-01

    Mobil Solar Energy Corporation manufactures photovoltaic modules based on its unique Edge-defined Film-fed Growth (EFG) process for producing octagon-shaped hollow polycrystalline silicon tubes. The octagons are cut by lasers into 100 mm x 100 mm wafers which are suitable for solar cell processing. This process avoids slicing, grinding and polishing operations which are wasteful of material and are typical of most other wafer production methods. EFG wafers are fabricated into solar cells and modules using processes that have been specially developed to allow scaling up to high throughput rates. The goals of the Photovoltaic Manufacturing Technology Initiative (PVMaT) program atmore » Mobil Solar were to improve the EFG manufacturing line through technology advances that accelerate cost reduction in production and stimulate market growth for its product. The program was structured into three main tasks: to decrease silicon utilization by lowering wafer thickness from 400 to 200 {mu}m; to enhance laser cutting yields and throughput while improving the wafer strength; and to raise crystal growth productivity and yield. The technical problems faced and the advances made in the Mobil Solar PVMaT program are described. The author concludes with a presentation of the results of a detailed cost model for EFT module production. This model describes the accelerated reductions in manufacturing costs which are already in place and the future benefits anticipated to result from the technical achievements of the PVMaT program.« less

  14. 75 FR 70031 - Antitrust Division

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ...) operate a branding program based upon distinctive trademarks to create high customer awareness of, demand... or subcontract a branding program; (vii) create printed and/or electronic materials for distribution...

  15. The Status of the Preparation and Hiring of School Principals in the U.S.-Affiliated Pacific Region. REL Technical Brief. REL 2008-No. 006

    ERIC Educational Resources Information Center

    Camblin, Sharon; Keir, Scott

    2008-01-01

    This technical brief describes the current status of the preparation and hiring of school principals in the Pacific Region--American Samoa, Guam, Hawaii, Republic of the Marshall Islands, Federated States of Micronesia (Chuuk, Kosrae, Pohnpei, and Yap), Commonwealth of the Northern Mariana Islands, and Republic of Palau. The brief answers the…

  16. 75 FR 33269 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Procurement List: Product Wooden Trunk Locker NSN: 8460-00-243-3234. NPA: Employment Source, Inc... competitor enjoying a profitable subcontract forever if the commercial portion of the trunk locker...

  17. 40 CFR 35.938-9 - Subcontracts under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...

  18. 48 CFR 2052.215-75 - Proposal presentation and format.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., education, and employment history of its employees, subcontractor personnel, and consultants, through... and categories, materials, subcontracts, travel, computer time, etc., must be included so that the...

  19. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  20. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  1. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  2. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  3. 48 CFR 3019.705-1 - General support for the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705-1 General support for the program. In any...

  4. Low-Activity Waste Pretreatment System Additional Engineering-Scale Integrated Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landon, Matt R.; Wilson, Robert A.

    Washington River Protections Solutions, LLC’s (WRPS) Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low-activity waste (ILAW) by feeding LAW directly from Tank Farms to the Waste Treatment and Immobilization Plant (WTP) LAW Facility, bypassing the WTP Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria (WAC). Full-scale and engineering-scale testing of critical technology elements, as part of the technology maturation process, are components of the overall LAWPS Project. WRPS awarded themore » engineering-scale integrated testing scope to AECOM via WRPS Subcontract 58349. This report is deliverable MSR-008 of the subcontract.« less

  5. 48 CFR 2011.104-70 - NRC Clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...

  6. 48 CFR 2011.104-70 - NRC Clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...

  7. 48 CFR 2011.104-70 - NRC Clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...

  8. 48 CFR 2011.104-70 - NRC Clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...

  9. 48 CFR 2011.104-70 - NRC Clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...

  10. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  11. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  12. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  13. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  14. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  15. A Case Study on the Status of Technical and Vocational Education in Thailand. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Shoolap, Charoon; Choomnoom, Siripan

    This two-part report presents an overview of the vocational and technical education system in Thailand. The first part is a review of the current and likely future situations pertaining to vocational and technical education in that country. An analysis of economic conditions, human resource development, and the existing technical and vocational…

  16. A Survey of Technical Standards for Command and Control Information Systems

    DTIC Science & Technology

    1991-09-01

    H-1 Appendix I Status of Work on Lower-Layer OSI STANAGS ................ I-1 Appendix J Status of NATO OSI STANAGS ...standards efforts for use of open systems in international military systems. Thus, TSGCE SG9 draft standardization agreements ( STANAGs ), NATO...Work in NATO OSI STANAGs for the Use of Open- --- I ISystems9 References I Acronyms Index JTC: Joint Technical Committee SC: Subcommittee Figure 1

  17. Access of Women and Girls to Technical Vocational Education in India. Studies in Technical and Vocational Education 36.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The role of women in India has undergone several changes over many years. Today women are emerging as self-reliant persons with equal status in all spheres of society, but they are still mostly employed in low-paid, low-skilled and low-status jobs. The emerging trends in technology indicate a greater need for the employment of many women,…

  18. 48 CFR 22.1603 - Exceptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or subcontracts for work performed exclusively outside the United States. (b) Exemptions granted by... ability of the Government to procure goods and services on an economical and efficient basis or if special...

  19. 48 CFR 15.401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.401 Definitions. As used in this subpart— Price means cost plus any fee or profit applicable to the contract type. Subcontract (except as...

  20. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  1. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  2. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  3. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  4. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  5. 42 CFR 480.120 - Information subject to disclosure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts under those contracts (except for proprietary or business information); (3) Copies of documents..., including a study design and methodology. (b) Aggregate statistical information that does not implicitly or...

  6. ENVIRONMENTAL RADIATION MONITORING IN THE CHERNOBYL EXCLUSION ZONE - HISTORY AND RESULTS 25 YEARS AFTER

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farfan, E.; Jannik, T.

    2011-10-01

    This article describes results of the radiation environmental monitoring performed in the Chernobyl Exclusion Zone (ChEZ) during the period following the 1986 Chernobyl Nuclear Power Plant accident. This article presents a brief overview of five comprehensive reports generated under Contract No. DE-AC09-96SR18500 (Washington Savannah River Company LLC, Subcontract No. AC55559N, SOW No. ON8778) and summarizes characteristics of the ChEZ and its post-accident status and the history of development of the radiation monitoring research in the ChEZ is described. This article addresses characteristics of the radiation monitoring in the ChEZ, its major goals and objectives, and changes of these goals andmore » objectives in the course of time, depending on the tasks associated with the phase of mitigation of the ChNPP accident consequences. The results of the radiation monitoring in the ChEZ during the last 25 years are also provided.« less

  7. Progress in the Design and Development of the ITER Low-Field Side Reflectometer (LFSR) System

    NASA Astrophysics Data System (ADS)

    Doyle, E. J.; Wang, G.; Peebles, W. A.; US LFSR Team

    2015-11-01

    The US has formed a team, comprised of personnel from PPPL, ORNL, GA and UCLA, to develop the LFSR system for ITER. The LFSR system will contribute to the measurement of a number of plasma parameters on ITER, including edge plasma electron density profiles, monitor Edge Localized Modes (ELMs) and L-H transitions, and provide physics measurements relating to high frequency instabilities, plasma flows, and other density transients. An overview of the status of design activities and component testing for the system will be presented. Since the 2011 conceptual design review, the number of microwave transmission lines (TLs) and antennas has been reduced from twelve (12) to seven (7) due to space constraint in the ITER Tokamak Port Plug. This change has required a reconfiguration and recalculation of the performance of the front-end antenna design, which now includes use of monostatic transmission lines and antennas. Work supported by US ITER/PPPL Subcontracts S013252-C and S012340, and PO 4500051400 from GA to UCLA.

  8. Development of the low-field side reflectometer for ITER

    NASA Astrophysics Data System (ADS)

    Muscatello, Christopher; Anderson, James; Gattuso, Anthony; Doyle, Edward; Peebles, William; Seraydarian, Raymond; Wang, Guiding; Kramer, Gerrit; Zolfaghari, Ali; Atomics Team, General; University of California Los Angeles Team; Princeton Plasma Physics Laboratory Team

    2017-10-01

    The Low-Field Side Reflectometer (LFSR) for ITER will provide real-time edge density profiles every 10 ms for feedback control and every 24 μs for physics evaluation. The spatial resolution will be better than 5 mm over 30 - 165 GHz, probing the scrape-off layer to the top of the pedestal in H-mode plasmas. An antenna configuration has been selected for measurements covering anticipated plasma elevations. Laboratory validation of diagnostic performance is underway using a LFSR transmission line (TL) mockup. The 40-meter TL includes circular corrugated waveguide, length calibration feature, Gaussian telescope, vacuum windows, containment membranes, and expansion joint. Transceiver modules coupled to the input of the TL provide frequency-modulated (FM) data for evaluation of performance as a monostatic reflectometer. Results from the mockup tests are presented and show that, with some further optimization, the LFSR will meet or exceed the measurement requirements for ITER. An update of the LFSR instrumentation design status is also presented with preliminary test results. Work supported by PPPL under subcontract S013252-A.

  9. 76 FR 60478 - Hydrogen and Fuel Cell Technical Advisory Committee (HTAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... DEPARTMENT OF ENERGY Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) AGENCY: Department...: The Hydrogen and Fuel Cell Technical Advisory Committee (HTAC) was established under section 807 of... Gas Supply on Fuel Cell and Hydrogen Market. Industry Presentations. Status Cost and Performance of...

  10. Study of Navy Enlisted Attrition: Race, Ethnicity, and Type of Occupation

    DTIC Science & Technology

    2008-09-01

    technical job. Further research is recommended to explore these results and to suggest approaches that might assist in lowering attrition rates...technical job than to a technical one; in contrast, most minorities are far more likely to attrite when serving in a technical job. Further research is... HIGH QUALITY (HQ) STATUS ..........................33 IV. RESULTS ................................................35 A. DESCRIPTIVE SUMMARY OF THE

  11. Oral Communication and Technical Writing: A Reconsideration of Writing in a Multicultural Era

    ERIC Educational Resources Information Center

    Cibangu, Sylvain K.

    2009-01-01

    This article investigates the status of orality in the history of technical communication. The article calls for orality as an integral part and driving force of technical writing. The article brings to light the misconceptions that have led to a diminished role of oral communication in technical writing. The article shows the implications of oral…

  12. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  13. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  14. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  15. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  16. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  17. 24 CFR 882.412 - Subcontracting of owner services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR... HUD approval, rents which exceed the appropriate Moderate Rehabilitation Fair Market Rent for a unit...

  18. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  19. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  20. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  1. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  2. 49 CFR 22.11 - Eligibility criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business with experience in the transportation industry and trade for which the STLP loan is sought; (5) Be...-executed transportation-related contract, subcontract, or purchase order held directly with DOT or with...

  3. A New Front in the Sweatshop Wars?

    ERIC Educational Resources Information Center

    Farrell, Elizabeth F.; Olsen, Florence

    2001-01-01

    Discusses how some prominent institutions prompt debate by subcontracting the labor-intensive work of putting documents online to vendors in developing countries. Libraries counter that contractors treat overseas employees well. (EV)

  4. 13 CFR 124.704 - What additional management and technical assistance is reserved exclusively for concerns eligible...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What additional management and.../SMALL DISADVANTAGED BUSINESS STATUS DETERMINATIONS 8(a) Business Development Management and Technical... management and technical assistance through its service providers exclusively to small business concerns...

  5. Identifying Needed Technical Standards: The LITA TESLA Committee at Work.

    ERIC Educational Resources Information Center

    Carter, Ruth C.

    1984-01-01

    Efforts of the Technical Standards for Library Automation Committee (TESLA), a division-wide committee of the Library Information and Technology Association (LITA) of the American Library Association, are described. The current status of suggested technical standards and recommended action are detailed. Five sources are given. (Author/EJS)

  6. 48 CFR 47.504 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., such as agricultural and food-aid shipments; (2) Shipments covered under 46 U.S.C. Appx 1241-1, such as those generated by Export-Import Bank loans or guarantees; (3) Subcontracts under— (i) Government...

  7. Strontium-90 Error Discovered in Subcontract Laboratory Spreadsheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. D. Brown A. S. Nagel

    1999-07-31

    West Valley Demonstration Project health physicists and environment scientists discovered a series of errors in a subcontractor's spreadsheet being used to reduce data as part of their strontium-90 analytical process.

  8. Microelectronics Status Analysis and Secondary Part Procureability Assessment of the THAAD Weapon System

    DTIC Science & Technology

    1999-10-01

    Technical Report 5-20448 & 5- 20449 Contract No. DAAH01-98-D-R001 Delivery Order No. 34 Microelectronics Status Analysis and Secondary Part...Procureability Assessment of the THAAD Weapon System. (5-20448 & 5- 20449 ) Final Technical Report for Period 21 January 1999 through 30 September 1999...Huntsville Huntsville, AL 35899 5. FUNDING NUMBERS 8. PERFORMING ORGANIZATION REPORT NUMBER 5-20448 & 5- 20449 9. SPONSORING/MONITORING AGENCY

  9. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  10. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  11. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  12. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... contract); (3) Apprentices and Trainees; (4) Payrolls and Basic Records; (5) Compliance with Copeland Act...

  13. International Business Machines (IBM) Corporation Interim Agreement EPA Case No. 08-0113-00

    EPA Pesticide Factsheets

    On March 27, 2008, the United States Environmental Protection Agency (EPA), suspended International Business Machines (IBM) from receiving Federal Contracts, approved subcontracts, assistance, loans and other benefits.

  14. 48 CFR 226.370-8 - Goals and incentives for subcontracting with HBCU/MIs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Historically Black Colleges and Universities and Minority Institutions 226.370-8 Goals and incentives for... educational institutions. (b) The contracting officer may, when contracting by negotiation, use in...

  15. 78 FR 42391 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... for the Jobs Act was the belief that contracting officers and prime contractors are not reporting or... for making false claims. SBA notes that the requirements that apply in the construction arena do not...

  16. Upcoming Purchasing and Subcontracting Opportunities | NREL

    Science.gov Websites

    Services Fall 2022 Construction@nrel.gov Design-Build and Construction Spring 2018 Construction@nrel.gov Design-Build for Minor Construction Spring 2020 Construction@nrel.gov Testing of Fuel and Oil Samples

  17. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  18. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  19. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... which the apparently successful offeror received an evaluation credit for proposing one or more SDB... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  20. 36 CFR 14.9 - Terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... employees of the contractors, and to indemnify the United States against any liability for damages to life..., or national origin and shall require an identical provision to be included in all subcontracts. (l...

  1. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... immediately. In doing so, the contractor shall explain the proposed method of solving the problem or shall... problems and the installation of lines and equipment as contemplated by the contract documents while...

  2. 48 CFR 227.7102-3 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... processes. Do not require the contractor to include this clause in its subcontracts. (2) Use the clause at... for commercial items or commercial components. (c) Use the clause at 252.227-7037, Validation of...

  3. 78 FR 49297 - NASA Advisory Council; Science Committee; Heliophysics Subcommittee; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-13

    ... persons, scientific and technical information relevant to program planning. DATES: Tuesday, September 17... topics: -- Heliophysics Division Overview and Program Status -- Flight Mission Status Report...

  4. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  5. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  6. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  7. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  8. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  9. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  10. 48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123...

  11. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  12. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  13. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  14. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  15. 48 CFR 252.225-7046 - Exports by Approved Community Members in Response to the Solicitation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... all applicable International Traffic in Arms Regulations (ITAR) requirements, including any criminal.../Title of Duly Authorized RepresentativeDate (h) Subcontracts. The offeror shall flow down the substance...

  16. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  17. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  18. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  19. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-2... production of an item or process begun as a prototype project under an other transaction agreement or as a...

  20. 77 FR 58413 - NASA Advisory Council; Science Committee; Heliophysics Subcommittee; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... persons, scientific and technical information relevant to program planning. DATES: Wednesday, October 10... Division Overview and Program Status --Flight Mission Status Report --Heliophysics Division Comments on...

Top