Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontractor advance payments-DoD pilot mentor-protege program. 252.232-7005 Section 252.232-7005 Federal... subcontractor advance payments—DoD pilot mentor-protege program. As prescribed in 232.412-70(c), use the following clause: Reimbursement of Subcontractor Advance Payments—DoD Pilot Mentor-Protege Program (SEP 2001...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
48 CFR 19.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...
1982-05-01
Thomas P. Kuchar 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK Stddent,HDQA, MILPERCEN (DAPC-OPP-E) AREA 6 WORK UNIT...of Financing ................................... 50 Business Practice Information Interchange .................. 50 Program Description...51 Other Types of Credit Exchange Programs .................... 52 Chapter Summary ............................................ 53 IV REM-EDY OPTIONS
48 CFR 3.502-2 - Subcontractor kickbacks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontractor kickbacks. 3.502-2 Section 3.502-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL...., company ethics rules prohibiting kickbacks by employees, agents, or subcontractors; education programs for...
48 CFR 9903.202-8 - Subcontractor Disclosure Statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Statements. 9903.202-8 Section 9903.202-8 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS... COST ACCOUNTING STANDARDS CONTRACT COVERAGE CAS Program Requirements 9903.202-8 Subcontractor.... Instead, the ACO cognizant of the subcontractor shall (i) Notify the auditor that the adequacy review will...
Employee Involvement White Collar Work Force (Phase 1)
1991-07-01
TITLE AND SUBTITLE Employee Involvement White Collar Work Force (Phase 1) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S...N COMMITTEE August 1991 NSRP 0337 AL EFFECTS TRANSFER Employee Involvement White Collar Work Force (Phase 1) UNITED STATES NAVY David Taylor Research...report. AS used In the above, “Persons acting on behalf of the United States Navy” includes any employee , contractor, or subcontractor to the
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-22
... DEPARTMENT OF LABOR Office of Federal Contract Compliance Programs 41 CFR Parts 60-250 and 60-300 RIN 1250-AA00 Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors... Nondiscrimination Obligations of Contractors and Subcontractors Regarding Protected Veterans'' (76 FR 23358). OFCCP...
Employee Involvement - White-Collar Work Force
1993-01-01
a currently valid OMB control number. 1. REPORT DATE JAN 1993 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Employee ...Involvement - White-Collar Work Force 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...34Persons acting on behalf of the Maritime Administration" includes any employee , contractor, or subcontractor to the contractor of the Maritime
48 CFR 519.7008 - Selection of protégé firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7008 Selection of protégé firms. (a) Mentor firms will be solely responsible for selecting protégé firms. Mentors are encouraged to... subcontractor or a newly selected subcontractor for the prime contractor's GSA contract. (b) Mentor firms may...
25 CFR 273.36 - Eligible subcontractors.
Code of Federal Regulations, 2011 CFR
2011-04-01
... ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Funding Provisions § 273.36 Eligible subcontractors. No contract funds under the Johnson-O'Malley Act shall be made available by the Bureau directly...
25 CFR 273.36 - Eligible subcontractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Funding Provisions § 273.36 Eligible subcontractors. No contract funds under the Johnson-O'Malley Act shall be made available by the Bureau directly...
25 CFR 273.36 - Eligible subcontractors.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Funding Provisions § 273.36 Eligible subcontractors. No contract funds under the Johnson-O'Malley Act shall be made available by the Bureau directly...
38 CFR 62.22 - Scoring criteria for supportive services grant applicants.
Code of Federal Regulations, 2011 CFR
2011-07-01
... for Veteran Families Program. (3) Organizational qualifications and past performance. (i) Applicant... background, qualifications, experience, and past performance, of the applicant, and any subcontractors...: (1) Background and organizational history. (i) Applicant's, and any identified subcontractors...
Respirators: Air Purifying, Self-Study, Course 40723
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chochoms, Michael
Respirators: Air Purifying Self-Study (COURSE 40723) is designed for Los Alamos National Laboratory (LANL) workers, support services subcontractors, and other LANL subcontractors who work under the LANL Respiratory Protection Program (RPP). This course also meets the air-purifying respirators (APRs) retraining requirement.
48 CFR 430.202-8 - Subcontractor Disclosure Statements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Subcontractor Disclosure Statements. 430.202-8 Section 430.202-8 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 430.202...
48 CFR 30.202-8 - Subcontractor disclosure statements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontractor disclosure statements. 30.202-8 Section 30.202-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Program Requirements 30.202...
75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-13
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...
42 CFR 438.414 - Information about the grievance system to providers and subcontractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Information about the grievance system to providers and subcontractors. 438.414 Section 438.414 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS MANAGED CARE Grievance System...
Code of Federal Regulations, 2013 CFR
2013-04-01
... result of a lawful collective bargaining contract, provided that the number of nonresident persons... contractor becomes involved in, or is threatened with litigation with a subcontractor or vendor as a result... threatened with, litigation with a subcontractor or supplier, as a result of such direction, the contractor...
Code of Federal Regulations, 2012 CFR
2012-04-01
... result of a lawful collective bargaining contract, provided that the number of nonresident persons... contractor becomes involved in, or is threatened with litigation with a subcontractor or vendor as a result... threatened with, litigation with a subcontractor or supplier, as a result of such direction, the contractor...
Code of Federal Regulations, 2014 CFR
2014-04-01
... result of a lawful collective bargaining contract, provided that the number of nonresident persons... contractor becomes involved in, or is threatened with litigation with a subcontractor or vendor as a result... threatened with, litigation with a subcontractor or supplier, as a result of such direction, the contractor...
Code of Federal Regulations, 2011 CFR
2011-04-01
... result of a lawful collective bargaining contract, provided that the number of nonresident persons... contractor becomes involved in, or is threatened with litigation with a subcontractor or vendor as a result... threatened with, litigation with a subcontractor or supplier, as a result of such direction, the contractor...
Gochfeld, Michael; Mohr, Sandra
2007-01-01
Increased reliance on subcontractors in all economic sectors is a serious occupational health and safety challenge. Short-term cost savings are offset by long-term liability. Hiring subcontractors brings specialized knowledge but also young, inexperienced, inadequately trained workers onto industrial and hazardous waste sites, which leads to increased rates of accidents and injuries. Reliable data on subcontractor occupational health and safety programs and performance are sparse. The US Department of Energy has an excellent safety culture on paper, but procurement practices and contract language deliver a mixed message—including some safety disincentives. Its biphasic safety outcome data are consistent with underreporting by some subcontractors and underachievement by others. These observations are relevant to the private and public sectors. Occupational health and safety should be viewed as an asset, not merely a cost. PMID:17666686
Gochfeld, Michael; Mohr, Sandra
2007-09-01
Increased reliance on subcontractors in all economic sectors is a serious occupational health and safety challenge. Short-term cost savings are offset by long-term liability. Hiring subcontractors brings specialized knowledge but also young, inexperienced, inadequately trained workers onto industrial and hazardous waste sites, which leads to increased rates of accidents and injuries. Reliable data on subcontractor occupational health and safety programs and performance are sparse. The US Department of Energy has an excellent safety culture on paper, but procurement practices and contract language deliver a mixed message--including some safety disincentives. Its biphasic safety outcome data are consistent with underreporting by some subcontractors and underachievement by others. These observations are relevant to the private and public sectors. Occupational health and safety should be viewed as an asset, not merely a cost.
Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling
NASA Astrophysics Data System (ADS)
Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata
2017-10-01
Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is not allowed to take longer) and maximum total value of subcontracted work. The problem is modelled as a mixed binary linear program that minimizes project cost. It can be solved using universal solvers (e.g. LINGO, AIMMS, CPLEX, MATLAB and Optimization Toolbox, etc.). However, developing a dedicated decision-support tool would facilitate practical applications. To illustrate the idea of the model, the authors present a numerical example to find the optimal set of resources allocated to a project.
41 CFR 60-300.40 - Applicability of the affirmative action program requirement.
Code of Federal Regulations, 2014 CFR
2014-07-01
... FEDERAL CONTRACTORS AND SUBCONTRACTORS REGARDING DISABLED VETERANS, RECENTLY SEPARATED VETERANS, ACTIVE... contractor also shall make the affirmative action program promptly available on-site upon OFCCP's request. ...
DEVELOPMENT OF A SAFETY COMMUNICATION AND RECOGNITION PROGRAM FOR CONSTRUCTION
SPARER, EMILY H.; HERRICK, ROBERT F.; DENNERLEIN, JACK T.
2017-01-01
Leading-indicator–based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator–based (e.g., injury rates) programs. We designed a leading-indicator–based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite, and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. PMID:25815741
1999-10-01
N8-96-3 Application of Industrial Engineering Techniques to Reduce Workers ’ Compensation and Environmental Costs - Deliverable A U.S. DEPARTMENT OF...disclosed in the report. As used in the above, “Persons acting on behalf of the United States Navy” includes any employee , contractor, or subcontractor to...the contractor of the United States Navy to the extent that such employee , contractor, or subcontractor to the contractor prepares, handles, or
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
14 CFR 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
14 CFR § 1260.151 - Monitoring and reporting program performance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...
41 CFR 60-741.41 - Availability of affirmative action program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... affirmative action program. 60-741.41 Section 60-741.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.41 Availability of...
41 CFR 60-741.41 - Availability of affirmative action program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... affirmative action program. 60-741.41 Section 60-741.41 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.41 Availability of...
Development of a safety communication and recognition program for construction.
Sparer, Emily H; Herrick, Robert F; Dennerlein, Jack T
2015-05-01
Leading-indicator-based (e.g., hazard recognition) incentive programs provide an alternative to controversial lagging-indicator-based (e.g., injury rates) programs. We designed a leading-indicator-based safety communication and recognition program that incentivized safe working conditions. The program was piloted for two months on a commercial construction worksite and then redesigned using qualitative interview and focus group data from management and workers. We then ran the redesigned program for six months on the same worksite. Foremen received detailed weekly feedback from safety inspections, and posters displayed worksite and subcontractor safety scores. In the final program design, the whole site, not individual subcontractors, was the unit of analysis and recognition. This received high levels of acceptance from workers, who noted increased levels of site unity and team-building. This pilot program showed that construction workers value solidarity with others on site, demonstrating the importance of health and safety programs that engage all workers through a reliable and consistent communication infrastructure. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.
48 CFR 1019.202-70-4 - General policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 1019.202-70-4 General policy. (a) Eligible prime... subcontractors. (b) A firm's status as a protégé under a Treasury contract must not have an effect on the firm's...
41 CFR 60-741.44 - Required contents of affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... affirmative action programs. 60-741.44 Section 60-741.44 Public Contracts and Property Management Other... OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.44 Required contents...
41 CFR 60-741.40 - Applicability of the affirmative action program requirement.
Code of Federal Regulations, 2011 CFR
2011-07-01
... affirmative action program requirement. 60-741.40 Section 60-741.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.40...
41 CFR 60-1.40 - Affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action... written affirmative action program for each of its establishments, if it has 50 or more employees and: (i... each nonconstruction subcontractor to develop and maintain a written affirmative action program for...
41 CFR 60-1.40 - Affirmative action programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action... written affirmative action program for each of its establishments, if it has 50 or more employees and: (i... each nonconstruction subcontractor to develop and maintain a written affirmative action program for...
41 CFR 60-741.40 - Applicability of the affirmative action program requirement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... affirmative action program requirement. 60-741.40 Section 60-741.40 Public Contracts and Property Management... EMPLOYMENT OPPORTUNITY, DEPARTMENT OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.40...
48 CFR 652.236-70 - Accident Prevention.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., toxic, reactive or unstable, or any operations which creates any kind of contamination inside an... be responsible for its subcontractors' compliance with this clause. (d) Written program. Before... develop a mutual understanding relative to administration of the overall safety program. (e) Notification...
LOVE CANAL MONITORING PROGRAM. GCA QA/QC (QUALITY ASSURANCE/QUALITY CONTROL) SUMMARY REPORT
One of the most important responsibilities of the Love Canal prime contractor was the institution and maintenance of a quality assurance program. An important objective of the quality assurance program was to alert the subcontractors to the importance of high quality work on thei...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Associates Inc. and its subcontractors, Fairview Industries and Smart Data Strategies, is conducting a... activities. First, this database will give HUD an ability to track home sales, foreclosures and tax... programs such as the Neighborhood Stabilization Program (NSP), the HOME Investment Partnership Program, and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. Payette; D. Tillman
During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrationsmore » at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Rural Area Small Business Plan 1819.7102 General. Pursuant to Public Law 100-590, NASA established a Rural Area Business Enterprise Development Plan, including methods for encouraging prime and subcontractors to use small business concerns located in rural areas as...
48 CFR 209.571-1 - Definitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Acquisition Program. “Pre-Major Defense Acquisition Program” means a program that is in the Materiel Solution...) Directing other contractors' (other than subcontractors) operations; (I) Developing test requirements and evaluating test data; (J) Developing work statements (but see paragraph (ii)(B) of this definition). (ii...
NASA Astrophysics Data System (ADS)
Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi
2018-03-01
It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.
Concept of Draft International Standard for a Unified Approach to Space Program Quality Assurance
NASA Astrophysics Data System (ADS)
Stryzhak, Y.; Vasilina, V.; Kurbatov, V.
2002-01-01
For want of the unified approach to guaranteed space project and product quality assurance, implementation of many international space programs has become a challenge. Globalization of aerospace industry and participation of various international ventures with diverse quality assurance requirements in big international space programs requires for urgent generation of unified international standards related to this field. To ensure successful fulfillment of space missions, aerospace companies should design and process reliable and safe products with properties complying or bettering User's (or Customer's) requirements. Quality of the products designed or processed by subcontractors (or other suppliers) should also be in compliance with the main user (customer)'s requirements. Implementation of this involved set of unified requirements will be made possible by creating and approving a system (series) of international standards under a generic title Space Product Quality Assurance based on a system consensus principle. Conceptual features of the baseline standard in this system (series) should comprise: - Procedures for ISO 9000, CEN and ECSS requirements adaptation and introduction into space product creation, design, manufacture, testing and operation; - Procedures for quality assurance at initial (design) phases of space programs, with a decision on the end product made based on the principle of independence; - Procedures to arrange incoming inspection of products delivered by subcontractors (including testing, audit of supplier's procedures, review of supplier's documentation), and space product certification; - Procedures to identify materials and primary products applied; - Procedures for quality system audit at the component part, primary product and materials supplier facilities; - Unified procedures to form a list of basic performances to be under configuration management; - Unified procedures to form a list of critical space product components, and unified procedures to define risks related to the specific component application and evaluate safety for the entire program implementation. In the eyes of the authors, those features together with a number of other conceptual proposals should constitute a unified standard-technical basis for implementing international space programs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontractor employed at a DOE Defense Nuclear Facility— (1) Whose position of employment has been, or will be... SOCIOECONOMIC PROGRAMS Implementation of Section 3161 of the National Defense Authorization Act for Fiscal Year...
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontractor employed at a DOE Defense Nuclear Facility— (1) Whose position of employment has been, or will be... SOCIOECONOMIC PROGRAMS Implementation of Section 3161 of the National Defense Authorization Act for Fiscal Year...
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontractor employed at a DOE Defense Nuclear Facility— (1) Whose position of employment has been, or will be... SOCIOECONOMIC PROGRAMS Implementation of Section 3161 of the National Defense Authorization Act for Fiscal Year...
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontractor employed at a DOE Defense Nuclear Facility— (1) Whose position of employment has been, or will be... SOCIOECONOMIC PROGRAMS Implementation of Section 3161 of the National Defense Authorization Act for Fiscal Year...
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontractor employed at a DOE Defense Nuclear Facility— (1) Whose position of employment has been, or will be... SOCIOECONOMIC PROGRAMS Implementation of Section 3161 of the National Defense Authorization Act for Fiscal Year...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-06
... subcontractor, VIVA Consulting LLC, a study of the Section 202 Supportive Housing for the Elderly Demonstration Planning Grant Program. The Section 202 Supportive Housing for the Elderly program provides capital advances and operating funds to nonprofit organizations (``sponsors'') to develop affordable elderly...
48 CFR 219.7103-2 - Contracting officer responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... advance agreement on the treatment of developmental assistance costs for either credit or reimbursement if... the clause at 252.232-7005, Reimbursement of Subcontractor Advance Payments—DoD Pilot Mentor-Protege Program, when a mentor firm provides advance payments to a protege firm under the Program and the mentor...
42 CFR 420.303 - HHS criteria for requesting books, documents, and records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false HHS criteria for requesting books, documents, and... HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM PROGRAM INTEGRITY: MEDICARE Access to Books, Documents, and Records of Subcontractors § 420.303 HHS criteria for requesting books, documents, and records...
Environment, Health, and Safety - Construction Subcontractors Documents |
NREL Environment, Health, and Safety - Construction Subcontractors Documents Environment , Health, and Safety - Construction Subcontractors Documents The purpose of this page is to ensure NREL Environment, Health and Safety (EH&S) requirements are understood by construction subcontractors and
48 CFR 49.108-1 - Subcontractor's rights.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontractor's rights. 49.108-1 Section 49.108-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-1 Subcontractor's rights. A subcontractor has...
48 CFR 1322.302 - Liquidated damages and overtime pay.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety... subcontractor inadvertently violated the Contract Work Hours and Safety Standards Act is set forth in CAM 1301...
48 CFR 1322.302 - Liquidated damages and overtime pay.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety... subcontractor inadvertently violated the Contract Work Hours and Safety Standards Act is set forth in CAM 1301...
77 FR 63298 - Accelerated Payments to Small Business Subcontractors
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... Business Subcontractors AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION..., Providing Prompt Payment to Small Business Subcontractors (July 11, 2012), DoD has taken steps to accelerate... business subcontractors. DATES: Effective through July 10, 2013, unless otherwise rescinded or extended...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-26
... Contractors and Subcontractors Regarding Protected Veterans; Proposed Rule #0;#0;Federal Register / Vol. 76... Nondiscrimination Obligations of Contractors and Subcontractors Regarding Protected Veterans AGENCY: Office of..., which requires covered Federal contractors and subcontractors to take affirmative action in employment...
NASA Technical Reports Server (NTRS)
Baer-Riedhart, Jennifer L.; Landy, Robert J.
1987-01-01
The highly integrated digital electronic control (HIDEC) program at NASA Ames Research Center, Dryden Flight Research Facility is a multiphase flight research program to quantify the benefits of promising integrated control systems. McDonnell Aircraft Company is the prime contractor, with United Technologies Pratt and Whitney Aircraft, and Lear Siegler Incorporated as major subcontractors. The NASA F-15A testbed aircraft was modified by the HIDEC program by installing a digital electronic flight control system (DEFCS) and replacing the standard F100 (Arab 3) engines with F100 engine model derivative (EMD) engines equipped with digital electronic engine controls (DEEC), and integrating the DEEC's and DEFCS. The modified aircraft provides the capability for testing many integrated control modes involving the flight controls, engine controls, and inlet controls. This paper focuses on the first two phases of the HIDEC program, which are the digital flight control system/aircraft model identification (DEFCS/AMI) phase and the adaptive engine control system (ADECS) phase.
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
48 CFR 19.703 - Eligibility requirements for participating in the program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...
48 CFR 952.223-78 - Sustainable acquisition program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...
48 CFR 952.223-78 - Sustainable acquisition program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...
48 CFR 952.223-78 - Sustainable acquisition program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...
48 CFR 952.223-78 - Sustainable acquisition program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... activities with and submit required reports through the Environmental Sustainability Coordinator or... Prime Contractor's Environmental Sustainability Coordinator at the supported facility. The Subcontractor... reports through the Environmental Sustainability Coordinator or equivalent position. Reporting under this...
25 CFR 900.189 - Does this coverage extend to subcontractors of self-determination contracts?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false Does this coverage extend to subcontractors of self-determination contracts? 900.189 Section 900.189 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR... this coverage extend to subcontractors of self-determination contracts? No. Subcontractors or...
48 CFR 1019.202-70-7 - Mentor firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Mentor firms. 1019.202-70... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 1019.202-70-7 Mentor firms. A mentor firm may be either... developmental assistance to enhance the capabilities of protégés to perform as subcontractors. Mentors will be...
48 CFR 719.273-4 - Eligibility of Mentor and Protégé firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International... business entities approved as Mentors may enter into agreements (hereafter referred to as “Mentor-Protégé... subcontractors. Eligible small business entities capable of providing developmental assistance may be approved as...
25 CFR 900.235 - What personal conflicts of interest must the standards of conduct regulate?
Code of Federal Regulations, 2011 CFR
2011-04-01
... (including a subcontractor) from participating in the review, analysis, or inspection of trust transactions involving an entity in which such persons have a direct financial interest or an employment relationship. It...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., teaming arrangement members, and subcontractors through use of a provision substantially the same as... Administration by using the Central Contractor Registration database or by contacting the SBA's Office of Small...
Code of Federal Regulations, 2010 CFR
2010-01-01
... requirements regarding subcontractor legal costs? (a) The contractor must have a monitoring system for subcontractor legal matters likely to reach $100,000 over the life of the matter. The purpose of this system is... subcontractor legal costs? 719.37 Section 719.37 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT...
25 CFR 1000.278 - Does this coverage extend to subcontractors of self-governance AFAs?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Does this coverage extend to subcontractors of self-governance AFAs? 1000.278 Section 1000.278 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS... subcontractors of self-governance AFAs? No, subcontractors or subgrantees providing services to a Pub. L. 93-638...
Predicting subcontractor performance using web-based Evolutionary Fuzzy Neural Networks.
Ko, Chien-Ho
2013-01-01
Subcontractor performance directly affects project success. The use of inappropriate subcontractors may result in individual work delays, cost overruns, and quality defects throughout the project. This study develops web-based Evolutionary Fuzzy Neural Networks (EFNNs) to predict subcontractor performance. EFNNs are a fusion of Genetic Algorithms (GAs), Fuzzy Logic (FL), and Neural Networks (NNs). FL is primarily used to mimic high level of decision-making processes and deal with uncertainty in the construction industry. NNs are used to identify the association between previous performance and future status when predicting subcontractor performance. GAs are optimizing parameters required in FL and NNs. EFNNs encode FL and NNs using floating numbers to shorten the length of a string. A multi-cut-point crossover operator is used to explore the parameter and retain solution legality. Finally, the applicability of the proposed EFNNs is validated using real subcontractors. The EFNNs are evolved using 22 historical patterns and tested using 12 unseen cases. Application results show that the proposed EFNNs surpass FL and NNs in predicting subcontractor performance. The proposed approach improves prediction accuracy and reduces the effort required to predict subcontractor performance, providing field operators with web-based remote access to a reliable, scientific prediction mechanism.
Predicting Subcontractor Performance Using Web-Based Evolutionary Fuzzy Neural Networks
2013-01-01
Subcontractor performance directly affects project success. The use of inappropriate subcontractors may result in individual work delays, cost overruns, and quality defects throughout the project. This study develops web-based Evolutionary Fuzzy Neural Networks (EFNNs) to predict subcontractor performance. EFNNs are a fusion of Genetic Algorithms (GAs), Fuzzy Logic (FL), and Neural Networks (NNs). FL is primarily used to mimic high level of decision-making processes and deal with uncertainty in the construction industry. NNs are used to identify the association between previous performance and future status when predicting subcontractor performance. GAs are optimizing parameters required in FL and NNs. EFNNs encode FL and NNs using floating numbers to shorten the length of a string. A multi-cut-point crossover operator is used to explore the parameter and retain solution legality. Finally, the applicability of the proposed EFNNs is validated using real subcontractors. The EFNNs are evolved using 22 historical patterns and tested using 12 unseen cases. Application results show that the proposed EFNNs surpass FL and NNs in predicting subcontractor performance. The proposed approach improves prediction accuracy and reduces the effort required to predict subcontractor performance, providing field operators with web-based remote access to a reliable, scientific prediction mechanism. PMID:23864830
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Policy. 22.503 Section 22.503 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS... require multiple construction contractors and/or subcontractors employing workers in multiple crafts or...
Impact of the Federal School-Based Student Mentoring Program. NCEE Evaluation Brief. NCEE 2009-4074
ERIC Educational Resources Information Center
National Center for Education Evaluation and Regional Assistance, 2009
2009-01-01
The Office of Management and Budget requested that the Institute of Education Sciences (IES) oversee an independent impact evaluation of the federal Student Mentoring Program, and in 2005 IES contracted with Abt Associates and its team of subcontractors (Branch Associates, Moore and Associates, and the Center for Resource Management) to conduct…
Earth resources research data facility R and D file. Volume 1: Documentary data
NASA Technical Reports Server (NTRS)
1971-01-01
Cumulative listings of the R and D file data are presented. All Earth Resources Program information available at the Manned Spacecraft Center is in Vol. 1. Sensor data collected during flights over NASA test sites and from missions flown by subcontractors supporting the Earth Resources Survey Program are included in Vol. 2.
48 CFR 252.239-7016 - Telecommunications security equipment, devices, techniques, and services.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., record, and data communications, including management information systems and local data networks that...) Sensitive information means any information the loss, misuse, or modification of which, or unauthorized... subcontractors to transmit— (i) Classified or sensitive information; (ii) Matters involving intelligence...
23 CFR 230.413 - Review reports.
Code of Federal Regulations, 2013 CFR
2013-04-01
... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...
23 CFR 230.413 - Review reports.
Code of Federal Regulations, 2012 CFR
2012-04-01
... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...
23 CFR 230.413 - Review reports.
Code of Federal Regulations, 2011 CFR
2011-04-01
... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...
23 CFR 230.413 - Review reports.
Code of Federal Regulations, 2014 CFR
2014-04-01
... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...
Considering Subcontractors in Distributed Scrum Teams
NASA Astrophysics Data System (ADS)
Rudzki, Jakub; Hammouda, Imed; Mikkola, Tuomas; Mustonen, Karri; Systä, Tarja
In this chapter we present our experiences with working with subcontractors in distributed Scrum teams. The context of our experiences is a medium size software service provider company. We present the way the subcontractors are selected and how Scrum practices can be used in real-life projects. We discuss team arrangements and tools used in distributed development teams highlighting aspects that are important when working with subcontractors. We also present an illustrative example where different phases of a project working with subcontractors are described. The example also provides practical tips on work in such projects. Finally, we present a summary of our data that was collected from Scrum and non-Scrum projects implemented over a few years. This chapter should provide a practical point of view on working with subcontractors in Scrum teams for those who are considering such cooperation.
Development of Hydrogen Education Programs for Government Officials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baxter, Shannon; Keller, Russ
1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site
48 CFR 209.571-1 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-7009, Organizational Conflict of Interest—Major Defense Acquisition Program. “Pre-Major Defense... than subcontractors) operations; (I) Developing test requirements and evaluating test data; (J) Developing work statements (but see paragraph (ii)(B) of this definition). (ii) Does not include— (A) Design...
48 CFR 209.571-1 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-7009, Organizational Conflict of Interest—Major Defense Acquisition Program. “Pre-Major Defense... than subcontractors) operations; (I) Developing test requirements and evaluating test data; (J) Developing work statements (but see paragraph (ii)(B) of this definition). (ii) Does not include— (A) Design...
48 CFR 209.571-1 - Definitions.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-7009, Organizational Conflict of Interest—Major Defense Acquisition Program. “Pre-Major Defense... than subcontractors) operations; (I) Developing test requirements and evaluating test data; (J) Developing work statements (but see paragraph (ii)(B) of this definition). (ii) Does not include— (A) Design...
48 CFR 970.5223-7 - Sustainable acquisition program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...
48 CFR 970.5223-7 - Sustainable acquisition program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...
48 CFR 970.5223-7 - Sustainable acquisition program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...
48 CFR 970.5223-7 - Sustainable acquisition program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...
48 CFR 725.703 - Contractor employees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...
Code of Federal Regulations, 2013 CFR
2013-01-01
....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...
Code of Federal Regulations, 2014 CFR
2014-01-01
....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...
Code of Federal Regulations, 2012 CFR
2012-01-01
....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...
Code of Federal Regulations, 2011 CFR
2011-01-01
....381 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Special Purpose Loans Defense Economic Transition Assistance § 120.381 Eligibility. (a) Eligible small businesses. A small... Program on which the small business was a prime contractor, subcontractor, or supplier at any tier. (b...
29 CFR 4.1a - Definitions and use of terms.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., child, parent, or other close relative of the contractor or subcontractor; a partner or officer of the contractor or subcontractor; a corporation closely connected with a contractor or subcontractor as a parent...
29 CFR 4.1a - Definitions and use of terms.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., child, parent, or other close relative of the contractor or subcontractor; a partner or officer of the contractor or subcontractor; a corporation closely connected with a contractor or subcontractor as a parent...
29 CFR 4.1a - Definitions and use of terms.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., child, parent, or other close relative of the contractor or subcontractor; a partner or officer of the contractor or subcontractor; a corporation closely connected with a contractor or subcontractor as a parent...
29 CFR 4.1a - Definitions and use of terms.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., child, parent, or other close relative of the contractor or subcontractor; a partner or officer of the contractor or subcontractor; a corporation closely connected with a contractor or subcontractor as a parent...
48 CFR 922.804-2 - Construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontractors for work to be performed in the specified geographical areas. (b) Other nonexempt construction... affirmative action steps to be taken by the offeror in connection with all work under the contract. Such... each craft involved in the performance of the contract work. All solicitations for construction...
48 CFR 5108.070 - Definitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... accompanying Industrial Preparedness Program Production Capacity Survey (DD Form 1519 TEST). The firm is... is contractually bound by inclusion of AFARS 5152.208-9001 in their contract to maintain production capacity for a negotiated length of time, to conduct subcontractor planning, and to produce specified...
48 CFR 5108.070 - Definitions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... accompanying Industrial Preparedness Program Production Capacity Survey (DD Form 1519 TEST). The firm is... is contractually bound by inclusion of AFARS 5152.208-9001 in their contract to maintain production capacity for a negotiated length of time, to conduct subcontractor planning, and to produce specified...
48 CFR 5108.070 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... accompanying Industrial Preparedness Program Production Capacity Survey (DD Form 1519 TEST). The firm is... is contractually bound by inclusion of AFARS 5152.208-9001 in their contract to maintain production capacity for a negotiated length of time, to conduct subcontractor planning, and to produce specified...
48 CFR 5108.070 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... accompanying Industrial Preparedness Program Production Capacity Survey (DD Form 1519 TEST). The firm is... is contractually bound by inclusion of AFARS 5152.208-9001 in their contract to maintain production capacity for a negotiated length of time, to conduct subcontractor planning, and to produce specified...
discovered her passion for science writing in 2010 when working as a subcontractor for the Bureau of Land Management's Joint Fire Science Program. Before she discovered science writing, she worked as a marketing English with a Professional Writing Emphasis, Carroll University
41 CFR 60-741.43 - Affirmative action policy.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action policy... OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.43 Affirmative action policy...
41 CFR 60-741.43 - Affirmative action policy.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action policy... OF LABOR 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.43 Affirmative action policy...
48 CFR 32.009 - Providing accelerated payments to small business subcontractors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Providing accelerated payments to small business subcontractors. 32.009 Section 32.009 Federal Acquisition Regulations System... accelerated payments to small business subcontractors. ...
High Technology Engineering Services, Inc. fiscal year 1993 and 1994 research and development report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This document has been prepared by the Professional Staff of High Technology Engineering Services, Inc. (HTES) for fiscal year (FY) 1993. Work was performed for various aspects of mechanical design and analysis, materials development and properties quantification, nuclear environment performance, and engineering program prioritization. The tasks enumerated in the subcontract, attachment B are: 1. Assist in preparation of final R&D report for SDC detector development. 2. Subcontractor shall make contributions to the development of innovative processes for the manufacture of quasi- isotropic, enhanced thermal conductivity compression molded advanced composite materials. 3. Perform finite element analysis as it relates to themore » Superconducting Super Collider Silicon Tracking System, both mechanical and thermal, of very thin section advanced composite materials. 4. Subcontractor shall perform technical studies, reviews, and assessments of the current program for advanced composites materials processing and testing. 5. Subcontractor shall attend meetings and discussions as directed by MEE-12 technical representative. Unfortunately during the course of FY93, technical and financial challenges prevailed against the aggressive goals set for the program. In point of fact, less than 25% of the contract value was able to be expended due to technical delays and programmatic funding cuts. Also, contracting difficulties with the SSC Lab and financial burdens at Los Alamos totally stopped progress on the subject subcontract during the whole of FY94. This was a great blow to me and the HTES, Inc. technical staff. Despite the negative influences over the years, significant progress was made in materials properties quantification and development of essential research and development documentation. The following brief report and attendant appendices will address these achievements.« less
Advanced Turbine Technology Applications Project (ATTAP)
NASA Technical Reports Server (NTRS)
1993-01-01
This report is the fifth in a series of Annual Technical Summary Reports for the Advanced Turbine Technology Applications Project (ATTAP), sponsored by the U.S. Department of Energy (DOE). The report was prepared by Garrett Auxiliary Power Division (GAPD), a unit of Allied-Signal Aerospace Company, a unit of Allied Signal, Inc. The report includes information provided by Garrett Ceramic Components, and the Norton Advanced Ceramics Company, (formerly Norton/TRW Ceramics), subcontractors to GAPD on the ATTAP. This report covers plans and progress on ceramics development for commercial automotive applications over the period 1 Jan. through 31 Dec. 1992. Project effort conducted under this contract is part of the DOE Gas Turbine Highway Vehicle System program. This program is directed to provide the U.S. automotive industry the high-risk, long-range technology necessary to produce gas turbine engines for automobiles with reduced fuel consumption, reduced environmental impact, and a decreased reliance on scarce materials and resources. The program is oriented toward developing the high-risk technology of ceramic structural component design and fabrication, such that industry can carry this technology forward to production in the 1990's. The ATTAP test bed engine, carried over from the previous AGT101 project, is being used for verification testing of the durability of next generation ceramic components, and their suitability for service at Reference Powertrain Design conditions. This document reports the technical effort conducted by GAPD and the ATTAP subcontractors during the fifth year of the project. Topics covered include ceramic processing definition and refinement, design improvements to the ATTAP test bed engine and test rigs, and the methodology development of ceramic impact and fracture mechanisms. Appendices include reports by ATTAP subcontractors in the development of silicon nitride materials and processes.
41 CFR 60-300.43 - Affirmative action policy.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action policy... OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... MEDAL VETERANS Affirmative Action Program § 60-300.43 Affirmative action policy. Under the affirmative...
41 CFR 60-300.43 - Affirmative action policy.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action policy... OF LABOR 300-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... MEDAL VETERANS Affirmative Action Program § 60-300.43 Affirmative action policy. Under the affirmative...
41 CFR 60-250.43 - Affirmative action policy.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action policy... OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... PROTECTED VETERANS Affirmative Action Program § 60-250.43 Affirmative action policy. Under the affirmative...
41 CFR 60-250.43 - Affirmative action policy.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action policy... OF LABOR 250-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS... PROTECTED VETERANS Affirmative Action Program § 60-250.43 Affirmative action policy. Under the affirmative...
24 CFR 242.53 - Excluded contractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Excluded contractors. 242.53... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.53 Excluded contractors. (a) Contracts relating to the... participation in federal programs, including but not limited to: A general contractor, a subcontractor, or...
Code of Federal Regulations, 2011 CFR
2011-01-01
... subcontractor legal matters likely to reach $100,000 over the life of the matter. The purpose of this system is to enable the contractor to perform the same type of analysis and review of subcontractor legal...
Fingerprinting of Materials: Technical Supplement
NASA Technical Reports Server (NTRS)
Workman, Gary L.
1992-01-01
This supplement to the Guidelines for Maintaining a Chemical Fingerprinting Program has been developed to assist NASA personnel, contractors, and sub-contractors in defining the technical aspects and basic concepts which can be used in chemical fingerprinting programs. This material is not meant to be totally inclusive to all chemical fingerprinting programs, but merely to present current concepts. Each program will be tailored to meet the needs of the individual organizations using chemical fingerprinting to improve their quality and reliability in the production of aerospace systems.
48 CFR 15.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...
48 CFR 15.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...
48 CFR 15.404-3 - Subcontract pricing considerations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...
Selecting a sterilisation subcontractor.
Donawa, M
2001-03-01
Medical device manufacturers who need contract sterilisation services sometimes lack extensive knowledge of the technical aspects of sterilisation processes. For this reason, they may have problems assessing quality requirements for subcontractor sterilisation services. This article discusses important quality issues that should be considered when selecting a sterilisation subcontractor.
Construction safety program for the National Ignition Facility, July 30, 1999 (NIF-0001374-OC)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benjamin, D W
1999-07-30
These rules apply to all LLNL employees, non-LLNL employees (including contract labor, supplemental labor, vendors, personnel matrixed/assigned from other National Laboratories, participating guests, visitors and students) and contractors/subcontractors. The General Rules-Code of Safe Practices shall be used by management to promote accident prevention through indoctrination, safety and health training and on-the-job application. As a condition for contracts award, all contractors and subcontractors and their employees must certify on Form S and H A-l that they have read and understand, or have been briefed and understand, the National Ignition Facility OCIP Project General Rules-Code of Safe Practices. (An interpreter must briefmore » those employees who do not speak or read English fluently.) In addition, all contractors and subcontractors shall adopt a written General Rules-Code of Safe Practices that relates to their operations. The General Rules-Code of Safe Practices must be posted at a conspicuous location at the job site office or be provided to each supervisory employee who shall have it readily available. Copies of the General Rules-Code of Safe Practices can also be included in employee safety pamphlets.« less
48 CFR 22.406-9 - Withholding from or suspension of contract payments.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Standards for Contracts Involving Construction 22.406-9 Withholding from or suspension of contract payments... contract with the same prime contractor that is subject to either Construction Wage Rate Requirements... contractor or subcontractor fails or refuses to comply with the labor standards clauses of the Construction...
78 FR 12745 - Accelerated Payments to Small Business Subcontractors
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-25
... Business Subcontractors AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... Prompt Payment to Small Business Subcontractors (July 11, 2012). DoD has now discontinued the temporary... assist small business prime contractors by paying them as quickly as possible after receipt of an invoice...
48 CFR 430.202-8 - Subcontractor Disclosure Statements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Subcontractor Disclosure Statements. 430.202-8 Section 430.202-8 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... authorized to determine that the Disclosure Statement for a subcontractor is impractical to secure and to...
48 CFR 430.202-8 - Subcontractor Disclosure Statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Subcontractor Disclosure Statements. 430.202-8 Section 430.202-8 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... authorized to determine that the Disclosure Statement for a subcontractor is impractical to secure and to...
48 CFR 430.202-8 - Subcontractor Disclosure Statements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Subcontractor Disclosure Statements. 430.202-8 Section 430.202-8 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... authorized to determine that the Disclosure Statement for a subcontractor is impractical to secure and to...
48 CFR 430.202-8 - Subcontractor Disclosure Statements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Subcontractor Disclosure Statements. 430.202-8 Section 430.202-8 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... authorized to determine that the Disclosure Statement for a subcontractor is impractical to secure and to...
48 CFR 32.110 - Payment of subcontractors under cost-reimbursement prime contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... under cost-reimbursement prime contracts. 32.110 Section 32.110 Federal Acquisition Regulations System... Purchase Financing 32.110 Payment of subcontractors under cost-reimbursement prime contracts. If the contractor makes financing payments to a subcontractor under a cost-reimbursement prime contract, the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... disadvantaged business concern certified by the Small Business Administration by using the Central Contractor Registration database or by contacting the SBA's Office of Small Disadvantaged Business Certification and... Business Administration, the Contractor shall accept the subcontractor's written self-representation as a...
Code of Federal Regulations, 2011 CFR
2011-10-01
... disadvantaged business concern certified by the Small Business Administration by using the Central Contractor Registration database or by contacting the SBA's Office of Small Disadvantaged Business Certification and... Business Administration, the Contractor shall accept the subcontractor's written self-representation as a...
NASTRAN users' experience of Avco Aerostructures Division
NASA Technical Reports Server (NTRS)
Blackburn, C. L.; Wilhelm, C. A.
1973-01-01
The NASTRAN experiences of a major structural design and fabrication subcontractor that has less engineering personnel and computer facilities than those available to large prime contractors are discussed. Efforts to obtain sufficient computer capacity and the development and implementation of auxiliary programs to reduce manpower requirements are described. Applications of the NASTRAN program for training users, checking out auxiliary programs, performing in-house research and development, and structurally analyzing an Avco designed and manufactured missile case are presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... Subcontractors: Syracuse Research Corporation; Tox Path, Inc; and Pathology Associates; Transfer of Data AGENCY... information that may have been claimed as confidential business information (CBI) by the submitter, will be transferred to Tetrahedron, Inc., and its subcontractors: Syracuse Research Corporation, Tox Path, Inc., and...
48 CFR 52.215-13 - Subcontractor Certified Cost or Pricing Data-Modifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Cost or Pricing Data-Modifications. 52.215-13 Section 52.215-13 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.215-13 Subcontractor Certified Cost or Pricing Data—Modifications. As prescribed in 15.408(e), insert the following clause: Subcontractor Certified Cost or Pricing Data...
48 CFR 227.7103-15 - Subcontractor rights in technical data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...
Code of Federal Regulations, 2010 CFR
2010-10-01
... associates and consultants (Architect-engineer services). 52.244-4 Section 52.244-4 Federal Acquisition... consultants (Architect-engineer services). As prescribed in 44.204(b), insert the following clause: Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) (AUG 1998) Any subcontractors...
Code of Federal Regulations, 2012 CFR
2012-10-01
... associates and consultants (Architect-engineer services). 52.244-4 Section 52.244-4 Federal Acquisition... consultants (Architect-engineer services). As prescribed in 44.204(b), insert the following clause: Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) (AUG 1998) Any subcontractors...
Code of Federal Regulations, 2011 CFR
2011-10-01
... associates and consultants (Architect-engineer services). 52.244-4 Section 52.244-4 Federal Acquisition... consultants (Architect-engineer services). As prescribed in 44.204(b), insert the following clause: Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) (AUG 1998) Any subcontractors...
Code of Federal Regulations, 2014 CFR
2014-10-01
... associates and consultants (Architect-engineer services). 52.244-4 Section 52.244-4 Federal Acquisition... consultants (Architect-engineer services). As prescribed in 44.204(b), insert the following clause: Subcontractors and Outside Associates and Consultants (Architect-Engineer Services) (AUG 1998) Any subcontractors...
48 CFR 227.7103-15 - Subcontractor rights in technical data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...
48 CFR 227.7103-15 - Subcontractor rights in technical data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...
48 CFR 227.7103-15 - Subcontractor rights in technical data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...
48 CFR 227.7103-15 - Subcontractor rights in technical data.
Code of Federal Regulations, 2014 CFR
2014-10-01
... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...
48 CFR 52.232-40 - Providing Accelerated Payments to Small Business Subcontractors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Payments to Small Business Subcontractors. 52.232-40 Section 52.232-40 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.232-40 Providing Accelerated Payments to Small Business... Contractor shall make accelerated payments to its small business subcontractors under this contract, to the...
42 CFR 421.110 - Requirements for approval of an agreement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES (CONTINUED) MEDICARE PROGRAM MEDICARE CONTRACTING Intermediaries § 421.110 Requirements for... regulatory authorities of the State or States in which it, or any subcontractor performing some or all of its... only providers located in a single State; (5) Has acted in good faith to achieve effective cooperation...
Advanced Seal Delivery System: Perspectives and Options
2006-01-01
in that order of importance. Once cracked by whatever mechanism, alloy 6-4 titanium (unlike some other titani - um materials) will fail immediately...NGC and its potential subcontractors is not as effective as it could be. Given the early history of the ASDS program, it does not surprise us that
48 CFR 52.215-12 - Subcontractor Certified Cost or Pricing Data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Cost or Pricing Data. 52.215-12 Section 52.215-12 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.215-12 Subcontractor Certified Cost or Pricing Data. As prescribed in 15.408(d), insert the following clause: Subcontractor Certified Cost or Pricing Data (OCT 2010) (a) Before awarding...
2013-04-12
statement of work. This document may be tailored by the acquisition activity for the specific application or program prior to contract award. 1.3...5 3. Definitions and Acronyms 3.1 Definitions The following definitions describe terms used throughout this document. Acquisition Activity The...acquisition activity is the Government, contractor, or subcontractor acquiring the equipment, system, subsystem, part, or material for which this
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gary D. McGinnis
2001-12-31
The research is a laboratory and bench-scale investigation of a system to concentrate and destroy volatile organic compounds (VOCs), including hazardous air pollutants, formed from the drying of wood and the manufacture of wood board products (e.g., particle board and oriented strandboard). The approach that was investigated involved concentrating the dilute VOCs (<500 ppmv) with a physical/chemical adsorption unit, followed by the treatment of the concentrated voc stream (2,000 to 2,500 ppmv) with a biofiltration unit. The research program lasted three years, and involved three research organizations. Michigan Technological University was the primary recipient of the financial assistance, the USDAmore » Forest Products Laboratory (FPL) and Mississippi State University (MSU) were subcontractors to MTU. The ultimate objective of this research was to develop a pilot-scale demonstration of the technology with sufficient data to provide for the design of an industrial system. No commercialization activities were included in this project.« less
78 FR 16500 - Rolling Bay, LLC and Indus; Transfer of Data
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... contract to perform work for OPP, and access to this information will enable Rolling Bay, LLC and its subcontractor, Indus, to fulfill the obligations of the contract. DATES: Rolling Bay, LLC and its subcontractor... Under Contract No. GS-35F-0072Y, Rolling Bay, LLC and its subcontractor, Indus, will: Capture data that...
The Impact of Globalisation on SME-Subcontractors' Supply Chain Strategies: A Danish Case Study
ERIC Educational Resources Information Center
Gammelgaard, Britta; Mathiasen, John Bang
2007-01-01
Globalisation and competition have impacted on not only large firms but also Small and Medium sizes Enterprises (SME) and these enterprises often act as subcontractors to larger firms operating in international markets. The impact of globalisation is severe on the SME-subcontractors due to supply chain linkages between large and SMEs through…
40 CFR 33.302 - Are there any additional contract administration requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...
40 CFR 33.302 - Are there any additional contract administration requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...
40 CFR 33.302 - Are there any additional contract administration requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...
40 CFR 33.302 - Are there any additional contract administration requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... faith efforts described in § 33.301 if soliciting a replacement subcontractor. (d) A recipient must require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime...
48 CFR 1852.219-79 - Mentor requirements and evaluation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...
48 CFR 1852.219-79 - Mentor requirements and evaluation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...
48 CFR 1852.219-79 - Mentor requirements and evaluation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...
48 CFR 1852.219-79 - Mentor requirements and evaluation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (Month/Year) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...
48 CFR 1852.219-79 - Mentor requirements and evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the semiannual report template found on the Web site at http://www.osbp.nasa.gov. (d) The mentor will... following clause: Mentor Requirements and Evaluation (MAY 2009) (a) The purpose of the NASA Mentor-Protégé Program is for a NASA prime contractor to provide developmental assistance to certain subcontractors...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... asserted that quantitative and measurable analyses similar to those for minorities and women were needed to... provided few details about the design or operation of the California State program, and that, consequently... recommended that the contractor be required to invite voluntary self- identification at both the pre- and post...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... safety of the offshore facility, including ensuring that all contractors and subcontractors have safety... safety analysis (task level); (3) Procedures to verify that contractors are conducting their activities in accordance with the operator's SEMS program and an evaluation to ensure that contractors have the...
The nexus between OSH and subcontracting.
Nunes, Isabel L
2012-01-01
Subcontracting of specialized functions to external companies (e.g. cleaning or maintenance) is actually very common within several industries. These external companies' are called contractors and their contracting is often designated as outsourcing. Frequently contractors involve other companies (the sub-contractors) to assist them in fulfilling the contract, resulting in a complex chain of organizations focused on interchange of work - the contracting chain. Therefore in the same work site can coexist workers form the client-company and workers from the contractors and/or subcontractors. Since contractors perform their job in client's facilities, they can be exposed to hazards that are unknown to them. On other hand, workers of the client company can also be exposed to hazardous situations derived from the work performed by the contractors. The paper discusses how adequate occupational safety and health conditions can be assured when dealing with this kind of dynamic labor networks. Two case-studies and several examples coming from international literature will be presented.
Final Technical Report for subcontract number B612144
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mayali, X.; Marcu, O.
The original statement of work stipulated that the Subcontractor shall perform bacterial and algal cultivation and manipulation, microbe isolation, preparation of samples for sequencing and isotopic analysis, data analysis, and manuscript preparation. The Subcontractor shall work closely with Dr. Mayali and other LLNL scientists, and shall participate in monthly SFA meetings (either in person or by telephone). The Subcontractor shall deliver a final report at the conclusion of the work.
Subcontractors and increased risk for work-related diseases and absenteeism.
Min, Kyoung B; Park, Shin G; Song, Jae S; Yi, Kwan H; Jang, Tae W; Min, Jin Y
2013-11-01
Despite increasing reliance on subcontracting in many economic sectors, there is little information available on occupational health and safety issues among subcontractor employees. The purpose of this study was to investigate the effect of subcontracting on self-reported health problems and absences due to occupational accidents and sickness using a nationally representative sample from South Korea. The data used were sampled from the second wave of the Korean Working Conditions Survey [2010]. Information on 3,282 parent firm employees and 728 subcontractor employees was obtained. For the logistic regression model, the outcomes were work-related health problems and absenteeism. The independent variables were personal and occupational characteristics, job aspects, and working hazards. Subcontractor employees were significantly more likely to experience health problems than the employee at parent firms. In particular, subcontractors' risk of injuries and anxiety/depression increased twofold (odd ratios, OR=2.01, 95% confidence interval, CIs, 1.24-3.26) and threefold (OR=2.95, 95% CIs 1.52-5.73), respectively, after controlling for potential variables. In addition, subcontractor employees were three times more likely than employees at parent firms to miss work due to illness (OR=3.56; 95% CIs 2.02-6.26). Working conditions, especially those related to job aspects and workplace exposures, attenuated these risks. Subcontracting workers were found to have a higher risk of work-related diseases and a higher absenteeism rate than parent firm workers. Our study highlights the need to protect and improve the occupational health and safety of subcontractor employees. Copyright © 2013 Wiley Periodicals, Inc.
Military Personnel Procurement Resources Report
1991-05-28
directed at enlistment in the Military Service. Include cost of advertising agency contract spent on marketing research (to include cost of advertising...programs. Include cost of advertising agency contract spent on marketing research (to include cost of advertising agency subcontractors). 7. Printed...Include cost of advertising agency contract spent on marketing research (to include cost of advertising agency sub- contractors). 7. Printed
29 CFR 5.23 - The statutory provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of wages”, “wage rates”, “minimum wages”, and “prevailing wages” shall include— (1) The basic hourly rate of pay; and (2) The amount of— (A) The rate of contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a fund, plan, or program; and (B) The rate of costs...
29 CFR 5.23 - The statutory provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of wages”, “wage rates”, “minimum wages”, and “prevailing wages” shall include— (1) The basic hourly rate of pay; and (2) The amount of— (A) The rate of contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a fund, plan, or program; and (B) The rate of costs...
29 CFR 5.23 - The statutory provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of wages”, “wage rates”, “minimum wages”, and “prevailing wages” shall include— (1) The basic hourly rate of pay; and (2) The amount of— (A) The rate of contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a fund, plan, or program; and (B) The rate of costs...
29 CFR 5.23 - The statutory provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of wages”, “wage rates”, “minimum wages”, and “prevailing wages” shall include— (1) The basic hourly rate of pay; and (2) The amount of— (A) The rate of contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a fund, plan, or program; and (B) The rate of costs...
29 CFR 5.23 - The statutory provisions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of wages”, “wage rates”, “minimum wages”, and “prevailing wages” shall include— (1) The basic hourly rate of pay; and (2) The amount of— (A) The rate of contribution irrevocably made by a contractor or subcontractor to a trustee or to a third person pursuant to a fund, plan, or program; and (B) The rate of costs...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
... includes contractors and subcontractors. Contracting companies have two testing options: Option one is for... case today and as such, there are no alternatives to the final rule that could have been considered and... stations would be classified as small business under NAICS 488180, the FAA reviewed a recent study...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...
The selection of construction sub-contractors using the fuzzy sets theory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krzemiński, Michał
The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set ofmore » evaluation criteria, the part of the knowledge base and a description of the output variable.« less
48 CFR 3.502-2 - Subcontractor kickbacks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the consequences of detection; procurement procedures to minimize the opportunity for kickbacks; audit... gifts or gratuities received from subcontractors; annual employee declarations that they have violated...
1987-12-01
acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that
Current Practices to Decrease Subcontractor Bid Shopping in the Public Sector
1993-01-01
rarely done because most contractors refuse to accept such a condition (6s15). Those public agencies adhering to the doctrine of promissory estoppel ...also encourage bid shopping. The doctrine of promissory estoppel dictates that a subcontractor must stand by his bid quote if it is used by the prime...Holman was not awarded the subcontract. (3) It is unfair to bind the subcontractor under promissory estoppel without binding the general contractor. (4
ERIC Educational Resources Information Center
Silvia, Suyapa; Blitstein, Jonathan; Williams, Jason; Ringwalt, Chris; Dusenbury, Linda; Hansen, William
2011-01-01
This is the second and final report summarizing findings from an impact evaluation of a violence prevention intervention for middle schools. This report provides findings from the second and third years of the 3-year intervention. The U.S. Department of Education (ED) contracted with RTI International and its subcontractors, Pacific Institute for…
Multiyear Subcontractor Selection Criteria Analysis.
1983-09-01
advancement are program instability, higher costs, and increased lead-times. Compounding the instability created by advancing technology are changes in...drive smaller firms out of business (17:46). Technology is advancing at an ever increasing pace, demanding higher performance and larger amounts of engi...Process Adding to the external factors mentioned above, the weapon systems acquisition process tends to retard pro- ductivity advancements by its very
1983-09-01
contractors requiring the product( s ) offered by the respondent first-tier subcontractor. 3. Knowledge of competition (ordinal)--the amount of market ...Question Interview Schedule Number Factor Question Number( s ) market environment 1, 2, - 4, 5, 7, 8, 9 perceived market environment 6 DOD business 16, 17...ADA T432 ECHNOLO MODERNIZATION FOR DOD SUBCONTRACTORS: A I STUDY 0F MARKET BUSINE..U AIR FORCE INS OF TECH WRIGHT-PATTERS AFB OH SCHOOLOD SS UNC ASS
Code of Federal Regulations, 2014 CFR
2014-07-01
... spouse, child, parent, or other close relative of the contractor or subcontractor; a partner or officer... subcontractor as parent, subsidiary, or otherwise, and an officer or agent of such corporation. (g) The term...
Code of Federal Regulations, 2013 CFR
2013-07-01
... spouse, child, parent, or other close relative of the contractor or subcontractor; a partner or officer... subcontractor as parent, subsidiary, or otherwise, and an officer or agent of such corporation. (g) The term...
Code of Federal Regulations, 2012 CFR
2012-07-01
... spouse, child, parent, or other close relative of the contractor or subcontractor; a partner or officer... subcontractor as parent, subsidiary, or otherwise, and an officer or agent of such corporation. (g) The term...
Code of Federal Regulations, 2010 CFR
2010-07-01
... spouse, child, parent, or other close relative of the contractor or subcontractor; a partner or officer... subcontractor as parent, subsidiary, or otherwise, and an officer or agent of such corporation. (g) The term...
Code of Federal Regulations, 2011 CFR
2011-07-01
... spouse, child, parent, or other close relative of the contractor or subcontractor; a partner or officer... subcontractor as parent, subsidiary, or otherwise, and an officer or agent of such corporation. (g) The term...
48 CFR 3003.502 - Subcontractor kickbacks.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 3003.502 Section 3003.502 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Other Improper Business Practices 3003.502 Subcontractor kickbacks. ...
Advanced Turbine Technology Applications Project (ATTAP)
NASA Technical Reports Server (NTRS)
1992-01-01
This report is the fourth in a series of Annual Technical Summary Reports for the Advanced Turbine Technology Applications Project (ATTAP). This report covers plans and progress on ceramics development for commercial automotive applications over the period 1 Jan. - 31 Dec. 1991. Project effort conducted under this contract is part of the DOE Gas Turbine Highway Vehicle System program. This program is directed to provide the U.S. automotive industry the high-risk, long-range technology necessary to produce gas turbine engines for automobiles with reduced fuel consumption, reduced environmental impact, and a decreased reliance on scarce materials and resources. The program is oriented toward developing the high-risk technology of ceramic structural component design and fabrication, such that industry can carry this technology forward to production in the 1990s. The ATTAP test bed engine, carried over from the previous AGT101 project, is being used for verification testing of the durability of next-generation ceramic components, and their suitability for service at Reference Powertrain Design conditions. This document reports the technical effort conducted by GAPD and the ATTAP subcontractors during the fourth year of the project. Topics covered include ceramic processing definition and refinement, design improvements to the ATTAP test bed engine and test rigs and the methodology development of ceramic impact and fracture mechanisms. Appendices include reports by ATTAP subcontractors in the development of silicon nitride and silicon carbide families of materials and processes.
48 CFR 1516.303-76 - Fee on cost-sharing contracts by subcontractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... alert to a potential vulnerability for the Government under cost-sharing contracts when evaluating... subcontractor is a wholly-owned subsidiary of the prime. The vulnerability consists of the subsidiary earning a...
Fabrication of the V-22 composite AFT fuselage using automated fiber placement
NASA Technical Reports Server (NTRS)
Pinckney, Robert L.
1991-01-01
Boeing Helicopters and its subcontractors are working together under an Air Force Wright Research and Development Center (WRDC)-Manufacturing-Technology Large-Composite Primary Structure Fuselage program to develop and demonstrate new manufacturing techniques for producing composite fuselage skin and frame structures. Three sets of aft fuselage skins and frames have been fabricated and assembled, and substantial reductions in fabrication and assembly costs demonstrated.
Inspection Report on "Employment Verification at Savannah River Site"
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2009-11-01
We conducted a review at the Savannah River Site to determine if Site subcontractors verified the employment status of all employees in accordance with Federal requirements and, if unauthorized individuals accessed the site. During our field work, we reviewed 600 I-9 Forms from 21 subcontractors to verify whether Site subcontractors were using the I-9 Forms; and if the forms were accurate and complete. We also conducted a judgmental sample of individuals who accessed the Site during a six-month period to determine if there were any documentation anomalies.
Waste isolation safety assessment program. Task 4. Third contractor information meeting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-06-01
The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less
49 CFR 26.11 - What records do recipients keep and report?
Code of Federal Regulations, 2010 CFR
2010-10-01
... universe of DBE and non-DBE contractors and subcontractors who seek to work on your Federally-assisted... estimate of the universe of DBE and non-DBE contractors and subcontractors who seek to work on your...
Code of Federal Regulations, 2010 CFR
2010-04-01
... SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Conflicts of Interest..., employees, and agents (including subcontractors) engaged in functions related to the management of trust...
48 CFR 42.505 - Postaward subcontractor conferences.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Postaward subcontractor conferences. 42.505 Section 42.505 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Postaward Orientation 42.505 Postaward...
48 CFR 5108.070 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... capacity for a negotiated length of time, to conduct subcontractor planning, and to produce specified... capacity for a negotiated length of time, to conduct subcontractor planning, and to produce specified... Section 5108.070 Federal Acquisition Regulations System DEPARTMENT OF THE ARMY ACQUISITION REGULATIONS...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., subcontractor, or subcontractor employee for the purpose of improperly obtaining or rewarding favorable... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Definitions. 3.502-1 Section 3.502-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER..., prime contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...
48 CFR 52.232-12 - Advance Payments.
Code of Federal Regulations, 2013 CFR
2013-10-01
... subcontractors for experimental, developmental, or research work. (3) If interest is required under the contract... each request for advance payments is true and correct. (8) These representations shall be continuing... nonprofit educational or research subcontractors for experimental, developmental, or research work...
48 CFR 52.232-12 - Advance Payments.
Code of Federal Regulations, 2014 CFR
2014-10-01
... subcontractors for experimental, developmental, or research work. (3) If interest is required under the contract... each request for advance payments is true and correct. (8) These representations shall be continuing... nonprofit educational or research subcontractors for experimental, developmental, or research work...
48 CFR 52.232-12 - Advance Payments.
Code of Federal Regulations, 2012 CFR
2012-10-01
... subcontractors for experimental, developmental, or research work. (3) If interest is required under the contract... each request for advance payments is true and correct. (8) These representations shall be continuing... nonprofit educational or research subcontractors for experimental, developmental, or research work...
48 CFR 52.232-12 - Advance Payments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... subcontractors for experimental, developmental, or research work. (3) If interest is required under the contract... each request for advance payments is true and correct. (8) These representations shall be continuing... nonprofit educational or research subcontractors for experimental, developmental, or research work...
48 CFR 52.232-12 - Advance Payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontractors for experimental, developmental, or research work. (3) If interest is required under the contract... each request for advance payments is true and correct. (8) These representations shall be continuing... nonprofit educational or research subcontractors for experimental, developmental, or research work...
48 CFR 3003.502-2 - Subcontractor kickbacks.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 3003.502-2 Section 3003.502-2 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Other Improper Business Practices 3003.502-2 Subcontractor kickbacks. (g) The DHS OIG...
Nuclear Physics Made Very, Very Easy
NASA Technical Reports Server (NTRS)
Hanlen, D. F.; Morse, W. J.
1968-01-01
The fundamental approach to nuclear physics was prepared to introduce basic reactor principles to various groups of non-nuclear technical personnel associated with NERVA Test Operations. NERVA Test Operations functions as the field test group for the Nuclear Rocket Engine Program. Nuclear Engine for Rocket Vehicle Application (NERVA) program is the combined efforts of Aerojet-General Corporation as prime contractor, and Westinghouse Astronuclear Laboratory as the major subcontractor, for the assembly and testing of nuclear rocket engines. Development of the NERVA Program is under the direction of the Space Nuclear Propulsion Office, a joint agency of the U.S. Atomic Energy Commission and the National Aeronautics and Space Administration.
Process Product Integrity Audits: A Hardware Auditing Technique for the '90s'
NASA Technical Reports Server (NTRS)
Taylor, Mike
1994-01-01
The Space Shuttle program has experienced hardware problems that have delayed several shuttle launches. A NASA review determined that the problems could have been prevented. NASA further concluded that a new kind of Quality emphasis at all Space Shuttle prime contractors and subcontractors was necessary to ensure mission success. To meet this challenge, NASA initiated an innovative review process called Process/Product Integrity (PPIA).
TRIDENT II (D-5) Strategic Weapon System Guide for Potential Subcontractors.
1982-01-01
pattern. Usually high technology item subcontracts are the first selected, This is followed by crit- ical, special long-lead time, common, and...performance. These disciplines provide the program with a definitive approach to maintaining high standards of reliability and readiness for weapon system...missile itself will be increased in length and diameter.. The range of the missile will be enhanced, and it will carry an increased payload. Energy
Human Factors in Aviation Maintenance. Phase 3. Volume 1. Progress Report
1993-08-01
As a subcontractor for Galaxy Scientific, Dr. Colin Drury at the State University at New York at Buffalo is conducting a substantial research program...taxonomy. In addition, however, Dr. Drury has developed a simulated NDI task, using a SUN workstation, that incorporates the physical aspects and...to both total task time and to the decision criterion used. Drury clearly feels, with some justification, that intensive investigation of individual
NREL photovoltaic program FY 1997 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, R.D.; Hansen, A.; Smoller, S.
1998-06-01
This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less
48 CFR 1602.170-15 - Subcontractor.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Subcontractor. 1602.170-15 Section 1602.170-15 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP...
48 CFR 1602.170-15 - Subcontractor.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontractor. 1602.170-15 Section 1602.170-15 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP...
48 CFR 1602.170-15 - Subcontractor.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Subcontractor. 1602.170-15 Section 1602.170-15 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP...
48 CFR 1602.170-14 - Subcontractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Subcontractor. 1602.170-14 Section 1602.170-14 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP...
48 CFR 52.203-7 - Anti-Kickback Procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...
48 CFR 52.203-7 - Anti-Kickback Procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contractor, prime Contractor employee, subcontractor, or subcontractor employee for the purpose of improperly...
48 CFR 52.203-7 - Anti-Kickback Procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...
48 CFR 52.203-7 - Anti-Kickback Procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Anti-Kickback Procedures. 52.203-7 Section 52.203-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... indirectly, to any prime Contractor, prime Contractor employee, subcontractor, or subcontractor employee for...
48 CFR 931.205-47 - Costs related to legal and other proceedings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENERGY GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial... those contractors and subcontractors with contracts exceeding $5,000,000. Employee whistleblower action... against a covered contractor or subcontractor, the contracting officer— (i) May authorize reimbursement of...
48 CFR 1852.234-2 - Earned Value Management System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...
48 CFR 1852.234-2 - Earned Value Management System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...
48 CFR 1852.234-2 - Earned Value Management System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... compliance/validation. The Contractor shall follow and implement the approved compliance/validation plan in a... process. (f) The Contractor shall be responsible for ensuring that its subcontractors, identified below... compliance/validation. (Contracting Officer to insert names of subcontractors or subcontracted effort.) (g...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-26
... Business Information by Science Applications International Corporation and Its Identified Subcontractor...: EPA has authorized its contractor, Science Applications International Corporation (SAIC) of McLean, VA and its identified subcontractor, Impact Innovations Systems, Inc. (IIS), to access information which...
48 CFR 3.502-2 - Subcontractor kickbacks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Subcontractor kickbacks. 3.502-2 Section 3.502-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL... rewarding favorable treatment in connection with a prime contract or a subcontract relating to a prime...
48 CFR 3.502-2 - Subcontractor kickbacks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Subcontractor kickbacks. 3.502-2 Section 3.502-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL... rewarding favorable treatment in connection with a prime contract or a subcontract relating to a prime...
77 FR 54864 - Federal Acquisition Regulation; Documenting Contractor Performance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-06
....g., late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to report... applicable) (e.g.; late or nonpayment to subcontractors, trafficking violations, tax delinquency, failure to... that allowing contractors to ``report to the CPARS system'' would have a negative impact on future...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
...-AA02 Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors Regarding... affirmative action regulations of section 503 of the Rehabilitation Act of 1973, as amended. This document..., OFCCP published a proposed rule entitled, ``Affirmative Action and Nondiscrimination Obligations of...
48 CFR 209.104-4 - Subcontractor responsibility.
Code of Federal Regulations, 2012 CFR
2012-10-01
...'s (CCC) proposal of a firm as its subcontractor is sufficient basis for an affirmative determination of responsibility. However, when the CCC determination of responsibility is not consistent with other information available to the contracting officer, the contracting officer shall request from CCC and any other...
48 CFR 209.104-4 - Subcontractor responsibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
...'s (CCC) proposal of a firm as its subcontractor is sufficient basis for an affirmative determination of responsibility. However, when the CCC determination of responsibility is not consistent with other information available to the contracting officer, the contracting officer shall request from CCC and any other...
Mori, Koji; Tateishi, Seiichiro; Kubo, Tatsuhiko; Kobayashi, Yuichi; Hiraoka, Ko; Kawashita, Futoshi; Hayashi, Takeshi; Kiyomoto, Yoshifumi; Kobashi, Masaki; Fukai, Kota; Tahara, Hiroyuki; Okazaki, Ryuji; Ogami, Akira; Igari, Kazuyuki; Suzuki, Katsunori; Kikuchi, Hiroshi; Sakai, Kazuhiro
2018-03-27
Numerous workers have participated in recovery efforts following the accident that occurred at the Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Plant after the Great East Japan Earthquake. These workers, belonging to various companies, have been engaged in various tasks since the accident. Given the hazards and stress involved in these tasks and the relatively long time required to transport sick or injured workers to medical institutions, it became necessary to quickly implement a more stringent management program for fitness for duty than in ordinary work environments. It took considerable time to introduce and improve a fitness-for-duty program because of several concerns. Various efforts were conducted, sometimes triggered by guidance from the Ministry of Health, Labour and Welfare (MHLW), but the implementation of the program was insufficient. In April 2016, a new program was initiated in which all primary contractors confirmed that their subcontractors had achieved five conditions for workers' fitness for duty on the basis of guidance from the MHLW and occupational health experts. TEPCO confirmed that all primary contractors had implemented the program successfully as of the end of November 2016. Following a disaster, even though the parties concerned understand the necessity of fitness-for-duty programs and that companies in high positions have responsibilities beyond their legal requirements, it is highly possible that they may hesitate to introduce such programs without guidance from the government. It is necessary to prepare a governmental framework and professional resources that introduce these stringent management programs quickly.
Two-echelon logistics service supply chain decision game considering quality supervision
NASA Astrophysics Data System (ADS)
Shi, Jiaying
2017-10-01
Due to the increasing importance of supply chain logistics service, we established the Stackelberg game model between single integrator and single subcontractors under decentralized and centralized circumstances, and found that logistics services integrators as a leader prefer centralized decision-making but logistics service subcontractors tend to the decentralized decision-making. Then, we further analyzed why subcontractor chose to deceive and rebuilt a principal-agent game model to monitor the logistics services quality of them. Mixed Strategy Nash equilibrium and related parameters were discussed. The results show that strengthening the supervision and coordination can improve the quality level of logistics service supply chain.
48 CFR 9.405-2 - Restrictions on subcontracting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... debarred, suspended, or proposed for debarment as evidenced by the parties' listing in SAM Exclusions (see... contractor's knowledge of the reasons for the subcontractor being listed in SAM Exclusions; (3) The compelling reason(s) for doing business with the subcontractor notwithstanding its listing in SAM Exclusions...
48 CFR 9.405-2 - Restrictions on subcontracting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... debarred, suspended, or proposed for debarment as evidenced by the parties' listing in SAM Exclusions (see... contractor's knowledge of the reasons for the subcontractor being listed in SAM Exclusions; (3) The compelling reason(s) for doing business with the subcontractor notwithstanding its listing in SAM Exclusions...
75 FR 8390 - Eligibility of a Nonprofit Corporation/Housing Consultant Certification
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... the project and has no conflict of interest. The general contractor, subcontractors, equipment lessees... relationship they have with the sponsor or the mortgagor. HUD uses this information to assure compliance with... and has no conflict of interest. The general contractor, subcontractors, equipment lessees, material...
48 CFR 227.7203-15 - Subcontractor rights in computer software or computer software documentation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... computer software or computer software documentation. 227.7203-15 Section 227.7203-15 Federal Acquisition... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Computer Software and Computer Software Documentation 227.7203-15 Subcontractor rights in computer software or computer software documentation. (a...
48 CFR 227.7203-15 - Subcontractor rights in computer software or computer software documentation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... computer software or computer software documentation. 227.7203-15 Section 227.7203-15 Federal Acquisition... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Computer Software and Computer Software Documentation 227.7203-15 Subcontractor rights in computer software or computer software documentation. (a...
48 CFR 227.7203-15 - Subcontractor rights in computer software or computer software documentation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... computer software or computer software documentation. 227.7203-15 Section 227.7203-15 Federal Acquisition... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Computer Software and Computer Software Documentation 227.7203-15 Subcontractor rights in computer software or computer software documentation. (a...
48 CFR 227.7203-15 - Subcontractor rights in computer software or computer software documentation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... computer software or computer software documentation. 227.7203-15 Section 227.7203-15 Federal Acquisition... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Computer Software and Computer Software Documentation 227.7203-15 Subcontractor rights in computer software or computer software documentation. (a...
48 CFR 227.7203-15 - Subcontractor rights in computer software or computer software documentation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... computer software or computer software documentation. 227.7203-15 Section 227.7203-15 Federal Acquisition... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Computer Software and Computer Software Documentation 227.7203-15 Subcontractor rights in computer software or computer software documentation. (a...
48 CFR 536.271 - Project labor agreements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... facilities to be owned by a Federal department or agency. You may use a PLA in leasehold arrangement... than $5 million. Project Labor Agreement (PLA) means an agreement between the contractor, subcontractors, and the union(s) representing workers. Under a PLA, the contractor and subcontractors on a...
75 FR 22407 - Versar, Inc. and Syracuse Research Corporation; Transfer of Data
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-28
... subcontractor, Syracuse Research Corporation, have been awarded a contract to perform work for OPP, and access... Versar, Inc. and its subcontractor, Syracuse Research Corporation, have completed their work. List of... Research Corporation; Transfer of Data AGENCY: Environmental Protection Agency (EPA). ACTION: Notice...
29 CFR 471.1 - What definitions apply to this part?
Code of Federal Regulations, 2010 CFR
2010-07-01
... NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS Definitions, Requirements for Employee Notice, and... location or facility at which a contractor or subcontractor meets a demand or performs a function relating...
75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...
JPL preferred parts list: Reliable electronic components
NASA Technical Reports Server (NTRS)
Covey, R. E.; Scott, W. R.; Hess, L. M.; Steffy, T. G.; Stott, F. R.
1982-01-01
The JPL Preferred Parts List was prepared to provide a basis for selection of electronic parts for JPL spacecraft programs. Supporting tests for the listed parts were designed to comply with specific spacecraft environmental requirements. The list tabulates the electronic, magnetic, and electromechanical parts applicable to all JPL electronic equipment wherein reliability is a major concern. The parts listed are revelant to equipment supplied by subcontractors as well as fabricated at the laboratory.
Garrison Project - Lake Sakakawea Oil and Gas Management Plan, North Dakota
2012-11-01
When the air gun is fired , pulses of acoustic energy are produced causing the shock waves needed for data collection (Peterson, 2004). • Seismic...The proposed casing program shall include the size, weight, grade, and length of casing proposed, type of thread and coupling, and setting depth of...suppression of fires on public lands caused by its employees, contractors or subcontractors. During conditions of extreme fire danger, surface use
Micro-Devices Using Resistance Change Materials (MODERN Materials)
2014-03-07
subcontractors/co-PIs on this program Taskl; subtaskl Design of micro-devices based on resistance change materials Taskl; subtask2 Fabrication and process...currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE ( DD -MM-YYYY) 07/03/2014 2. REPORT TYPE Final...Technical Report 3. DATES COVERED (From Jan 2013-May 2014 To) 4. TITLE AND SUBTITLE Micro Devices based on Resistance Change Materials 5a
2014-12-01
Local Economic Impact of UH-72A Manufacture ................42 viii e. EADS’ (Now Airbus Group’s) Suppliers and Subcontractors...Headquarters, Department of the Army IFR instrument flight rules IOTE initial operational test and evaluation IR infrared KO contracting officer kt...instrument flight rules ( IFR ) and visual flight rules (VFR) capabilities, thereby allowing flight at night and under low visibility weather
Gaining Leverage Over Vendor Lock to Improve Acquisition Performance and Cost Efficiencies
2014-04-30
Virginia Wydler, MITRE Corporation Open Systems Architecture License Rights: A New Era for the Public– Private Market -Place Nickolas Guertin, DASN RDT...if only one vendor can replace or upgrade those key components, that de facto monopolist may be able to exert excess negotiating leverage over...instead of sole source subcontractor procurement. The Program Office should have the prime vendor to provide a full market research data in accordance
Report of the Defense Science Board Task Force on Defense Nuclear Agency
1993-04-01
capability . including an adequate body of technically-qualifted people? ...................................................... ilI 3) What happens f...operational or warfighting capabilities ; no established way of providing support to CINCs: and in any event. DNA’s technology programs are broader than DOE’s...success of the major primes and their subcontractors (who are part of the DNA core capability ). We recommend that DNA continue to be the primary focal
Apollo experience report: Postflight testing of command modules
NASA Technical Reports Server (NTRS)
Hamilton, D. T.
1973-01-01
Various phases of the postflight testing of the command modules used in the Apollo Program are presented. The specific tasks to be accomplished by the task force recovery teams, the National Aeronautics and Space Administration Lyndon B. Johnson Space Center, (formerly the Manned Spacecraft Center) and the cognizant contractors/subcontractors are outlined. The means and methods used in postflight testing and how such activities evolved during the Apollo Program and were tailored to meet specific test requirements are described. Action taken to resolve or minimize problems or anomalies discovered during the flight, the postflight test phase, or mission evaluation is discussed.
Apollo experience report: Command and service module communications subsystem
NASA Technical Reports Server (NTRS)
Lattier, E. E., Jr.
1974-01-01
The development of spacecraft communications hardware from design to operation is described. Programs, requirements, specifications, and design approaches for a variety of functions (such as voice, telemetry, television, and antennas) are reviewed. Equipment environmental problems such as vibration, extreme temperature variation, and zero gravity are discussed. A review of the development of managerial techniques used in refining the roles of prime and subcontractors is included. The hardware test program is described in detail as it progressed from breadboard design to manned flight system evaluations. Finally, a series of actions is recommended to managers of similar projects to facilitate administration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirby, M.J.; Kramer, S.R.; Pittard, G.T.
Jason Consultants International, Inc., under the sponsorship of the Gas Research Institute (GRI), has developed guidelines, procedures and software, which are described in this paper, for the installation of polyethylene gas pipe using guided horizontal drilling. Jason was aided in this development by two key subcontractors; Maurer Engineering who wrote the software and NICOR Technologies who reviewed the software and guidelines from a utility perspective. This program resulted in the development of commerically viable software for utilities, contractors, engineering firms, and others involved with the installation of pipes using guided horizontal drilling. The software is an interactive design tool thatmore » allows the user to enter ground elevation data, alignment information and pipe data. The software aides the engineer in designing a drill path and provides plan and profile views along with tabular data for pipe depth and surface profile. Finally, the software calculates installation loads and pipe stresses, compares these values against pipe manufacturer`s recommendations, and provides this information graphically and in tabular form. 5 refs., 18 figs., 2 tabs.« less
Viking lander: Creating the science teams
NASA Technical Reports Server (NTRS)
1984-01-01
The teams of scientists and the contractors involved in designing and fabricating the Viking lander spacecraft for Mars exploration are discussed. The requirements established for each member of the research teams are enumerated and the personnel selection process is described. Two instruments for the lander, a gas chromatograph-mass spectrometer and a biology life detection instrument, are addressed in terms of costs, design, planning, and subcontractors. The challenges and ultimate success of the research management efforts are related in detail.
Government - Prime Contractor - Subcontractor Relationships: An Analysis.
1979-12-01
contract, prime contractor frustration and animosity due to over zealous 122 JAM ,- Government managers, and subcontractor problems of "over- reach" and...Journal, Vol. 12, No. 2,Second Quarter, 1978. 41. Singer, N.P., "The Unheard of Standard Set of Sub- contract Terms and Conditions - As Easy as Pumpkin Pie
48 CFR 215.408 - Solicitation provisions and contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY....215-11, Price Reduction for Defective Cost or Pricing Data—Modifications; (ii) FAR 52.215-12, Subcontractor Cost or Pricing Data; or (iii) FAR 52.215-13, Subcontractor Cost or Pricing Data—Modifications. (2...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-06
... Business Information by Science Applications International Corporation and Its Identified Subcontractors..., Science Applications International Corporation (SAIC) of McLean, VA, and its subcontractors to access information which has been submitted to EPA under all sections of the Toxic Substances Control Act (TSCA...
77 FR 75089 - Federal Acquisition Regulation; Accelerated Payments to Small Business Subcontractors
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-19
... link ``Submit a Comment'' that corresponds with FAR Case 2012-031. Follow the instructions provided at... proper documentation from small business subcontractors. The clause will be inserted into all new... of commercial items. * * * * * (d) * * * (4) Insert the clause at 52.232-XX, Providing Accelerated...
48 CFR 852.236-80 - Subcontracts and work coordination.
Code of Federal Regulations, 2011 CFR
2011-10-01
... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...
48 CFR 852.236-80 - Subcontracts and work coordination.
Code of Federal Regulations, 2014 CFR
2014-10-01
... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...
48 CFR 852.236-80 - Subcontracts and work coordination.
Code of Federal Regulations, 2012 CFR
2012-10-01
... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...
48 CFR 852.236-80 - Subcontracts and work coordination.
Code of Federal Regulations, 2013 CFR
2013-10-01
... trades, subcontractors, and material suppliers. The contractor shall, in advance of the work, prepare... contractor shall also be responsible for coordination of the work of the trades, subcontractors, and material.... Drawings may be composite (with distinctive colors for the various trades) or may be separate but fully...
48 CFR 52.222-41 - Service Contract Act of 1965.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subcontractor which are unsanitary, hazardous, or dangerous to the health or safety of the service employees. The Contractor or subcontractor shall comply with the safety and health standards applied under 29 CFR... avoid serious impairment of the conduct of Government business. (1) Apprentices, student-learners, and...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Opportunity: Employment Practices. IV. Equal Opportunity: Selection of Subcontractors, Procurement of... pay or other forms of compensation; and selection of training, including apprenticeship. The... selection of subcontractors, procurement of materials, and leasing of equipment. During the performance of...
48 CFR 49.108-6 - Delay in settling subcontractor settlement proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Delay in settling subcontractor settlement proposals. 49.108-6 Section 49.108-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-6 Delay in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-17
... LaSalle for Smith, Arkansas; Amended Certification Regarding Eligibility To Apply for Worker Adjustment... Systems (subcontractor of IBM Corporation), Fort Smith, Arkansas. The Department's notice of determination... employed on-site at the Fort Smith, Arkansas location of Whirlpool Corporation. The Department has...
48 CFR 30.202-8 - Subcontractor disclosure statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontractor disclosure statements. 30.202-8 Section 30.202-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... change the determination of the lower-tier CFAO. (b) Any determination that it is impractical to secure a...
48 CFR 30.202-8 - Subcontractor disclosure statements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Subcontractor disclosure statements. 30.202-8 Section 30.202-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... change the determination of the lower-tier CFAO. (b) Any determination that it is impractical to secure a...
48 CFR 30.202-8 - Subcontractor disclosure statements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Subcontractor disclosure statements. 30.202-8 Section 30.202-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... change the determination of the lower-tier CFAO. (b) Any determination that it is impractical to secure a...
48 CFR 30.202-8 - Subcontractor disclosure statements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Subcontractor disclosure statements. 30.202-8 Section 30.202-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... change the determination of the lower-tier CFAO. (b) Any determination that it is impractical to secure a...
Using a fuzzy DEMATEL method for analyzing the factors influencing subcontractors selection
NASA Astrophysics Data System (ADS)
Kozik, Renata
2016-06-01
Subcontracting is a long-standing practice in the construction industry. This form of project organization, if manage properly, could provide the better quality, reduction in project time and costs. Subcontractors selection is a multi-criterion problem and can be determined by many factors. Identifying the importance of each of them as well as the direction of cause-effect relations between various types of factors can improve the management process. Their values could be evaluated on the basis of the available expert opinions with the application of a fuzzy multi-stage grading scale. In this paper it is recommended to use fuzzy DEMATEL method to analyze the relationship between factors affecting subcontractors selection.
Pathman, Donald E; Chuang, Emmeline; Weiner, Bryan J
2008-12-18
Foundations and public agencies commonly fund focused initiatives for individual grantees. These discrete, stand-alone initiatives can risk failure by being carried out in isolation. Fostering synergy among grantees' initiatives is one strategy proposed for promoting the success and impact of grant programs. We evaluate an explicit strategy to build synergy within the Robert Wood Johnson Foundation's Southern Rural Access Program (SRAP), which awarded grants to collaboratives within eight southeastern U.S. states to strengthen basic health care services in targeted rural counties. We interviewed 39 key participants of the SRAP, including the program director within each state and the principal subcontractors heading the program's funded initiatives that supported heath professionals' recruitment, retention and training, made loans to health care providers, and built networks among providers. Interews were recorded and transcribed. Two investigators independently coded the transcripts and a third investigator distilled the main points. Participants generally perceived that the SRAP yielded more synergies than other grant programs in which they had participated and that these synergies added to the program's impact. The synergies most often noted were achieved through relationship building among grantees and with outside agencies, sharing information and know-how, sharing resources, combining efforts to yield greater capacity, joining voices to advocate for common goals, and spotting gaps in services offered and then filling these gaps. The SRAP's strategies that participants felt fostered synergy included targeting funding to culturally and geographically similar states, supporting complementary types of initiatives, promoting opportunities to network through semi-annual meetings and regular conference calls, and the advocacy efforts of the program's leadership. Participants noted that synergies were sometimes hindered by turf issues and politics and the conflicting perspectives and cultures of participating organizations and racial groups. Inadequate funding through the SRAP, restricting program involvement to only a few needy counties, and instances of over- and under-involvement by the program's leadership were sometimes felt to inhibit synergies and/or their sustainability. Participants of the SRAP generally perceived that the SRAP's deliberate strategies yielded synergies that added to the program's impact.
Pathman, Donald E; Chuang, Emmeline; Weiner, Bryan J
2008-01-01
Background Foundations and public agencies commonly fund focused initiatives for individual grantees. These discrete, stand-alone initiatives can risk failure by being carried out in isolation. Fostering synergy among grantees' initiatives is one strategy proposed for promoting the success and impact of grant programs. We evaluate an explicit strategy to build synergy within the Robert Wood Johnson Foundation's Southern Rural Access Program (SRAP), which awarded grants to collaboratives within eight southeastern U.S. states to strengthen basic health care services in targeted rural counties. Methods We interviewed 39 key participants of the SRAP, including the program director within each state and the principal subcontractors heading the program's funded initiatives that supported heath professionals' recruitment, retention and training, made loans to health care providers, and built networks among providers. Interews were recorded and transcribed. Two investigators independently coded the transcripts and a third investigator distilled the main points. Results Participants generally perceived that the SRAP yielded more synergies than other grant programs in which they had participated and that these synergies added to the program's impact. The synergies most often noted were achieved through relationship building among grantees and with outside agencies, sharing information and know-how, sharing resources, combining efforts to yield greater capacity, joining voices to advocate for common goals, and spotting gaps in services offered and then filling these gaps. The SRAP's strategies that participants felt fostered synergy included targeting funding to culturally and geographically similar states, supporting complementary types of initiatives, promoting opportunities to network through semi-annual meetings and regular conference calls, and the advocacy efforts of the program's leadership. Participants noted that synergies were sometimes hindered by turf issues and politics and the conflicting perspectives and cultures of participating organizations and racial groups. Inadequate funding through the SRAP, restricting program involvement to only a few needy counties, and instances of over- and under-involvement by the program's leadership were sometimes felt to inhibit synergies and/or their sustainability. Conclusion Participants of the SRAP generally perceived that the SRAP's deliberate strategies yielded synergies that added to the program's impact. PMID:19094212
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-29
...-readiness processes of potential contractors and subcontractors as a part of the source selection process... Supplement (DFARS) subpart 215.3, Source Selection. It amends DFARS 215.304(c) by adding paragraph (iv) to... and subcontractors shall be considered as a part of the source selection process for major defense...
48 CFR 52.214-28 - Subcontractor Certified Cost or Pricing Data-Modifications-Sealed Bidding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Cost or Pricing Data-Modifications-Sealed Bidding. 52.214-28 Section 52.214-28 Federal Acquisition... CONTRACT CLAUSES Text of Provisions and Clauses 52.214-28 Subcontractor Certified Cost or Pricing Data... Cost or Pricing Data—Modifications—Sealed Bidding (OCT 2010) (a) The requirements of paragraphs (b) and...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Indian tribe or tribal organization carrying out a self-determination contract? 900.38 Section 900.38... the subcontractors of an Indian tribe or tribal organization carrying out a self-determination... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Indian tribe or tribal organization carrying out a self-determination contract? 900.38 Section 900.38... the subcontractors of an Indian tribe or tribal organization carrying out a self-determination... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Indian tribe or tribal organization carrying out a self-determination contract? 900.38 Section 900.38... the subcontractors of an Indian tribe or tribal organization carrying out a self-determination... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Indian tribe or tribal organization carrying out a self-determination contract? 900.38 Section 900.38... the subcontractors of an Indian tribe or tribal organization carrying out a self-determination... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Indian tribe or tribal organization carrying out a self-determination contract? 900.38 Section 900.38... the subcontractors of an Indian tribe or tribal organization carrying out a self-determination... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT...
42 CFR 438.810 - Expenditures for enrollment broker services.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Freedom from conflict of interest. The broker and its subcontractor are free from conflict of interest. A broker or subcontractor is not considered free from conflict of interest if any person who is the owner... been, or is now, subject to civil money penalties under the Act. (3) Approval. The initial contract or...
42 CFR 438.810 - Expenditures for enrollment broker services.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Freedom from conflict of interest. The broker and its subcontractor are free from conflict of interest. A broker or subcontractor is not considered free from conflict of interest if any person who is the owner... been, or is now, subject to civil money penalties under the Act. (3) Approval. The initial contract or...
42 CFR 438.810 - Expenditures for enrollment broker services.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Freedom from conflict of interest. The broker and its subcontractor are free from conflict of interest. A broker or subcontractor is not considered free from conflict of interest if any person who is the owner... been, or is now, subject to civil money penalties under the Act. (3) Approval. The initial contract or...
42 CFR 438.810 - Expenditures for enrollment broker services.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Freedom from conflict of interest. The broker and its subcontractor are free from conflict of interest. A broker or subcontractor is not considered free from conflict of interest if any person who is the owner... been, or is now, subject to civil money penalties under the Act. (3) Approval. The initial contract or...
42 CFR 438.810 - Expenditures for enrollment broker services.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Freedom from conflict of interest. The broker and its subcontractor are free from conflict of interest. A broker or subcontractor is not considered free from conflict of interest if any person who is the owner... been, or is now, subject to civil money penalties under the Act. (3) Approval. The initial contract or...
48 CFR 552.236-83 - Requirement for a Project Labor Agreement.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... “Project Labor Agreement” (PLA) means an agreement between the contractor, subcontractors, and the union(s) representing workers. Under a PLA, the contractor and subcontractors on a project and the union(s) agree on... Contractor shall, after contract award, enter into a PLA for performance of [Insert project or contract name...
48 CFR 52.232-27 - Prompt payment for construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the... include such clauses in their subcontracts with each lower-tier subcontractor or supplier. (d) Subcontract... impair the right of the Contractor or a subcontractor at any tier to negotiate, and to include in their...
78 FR 32250 - CDM Smith and Dynamac Corp; Transfer of Data
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-29
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2013-0036; FRL-9387-5] CDM Smith and Dynamac Corp... the submitter, will be transferred to CDM Smith and its subcontractor, Dynamac Corp, in accordance with 40 CFR 2.307(h)(3) and 2.308(i)(2). CDM Smith and its subcontractor, Dynamac Corp, have been...
Ohio-Based NREL Subcontractor Wins Major Small Business Award
Ohio-Based NREL Subcontractor Wins Major Small Business Award For more information contact: e:mail alternative fuel vehicles has won a major award from the U.S. Small Business Administration (SBA). Automotive Testing Laboratories, Inc. (ATL) of East Liberty, Ohio was named the SBA's Midwest Regional Small Business
42 CFR 420.303 - HHS criteria for requesting books, documents, and records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 3 2013-10-01 2013-10-01 false HHS criteria for requesting books, documents, and... Books, Documents, and Records of Subcontractors § 420.303 HHS criteria for requesting books, documents, and records. HHS will generally request books, documents, and records from a subcontractor only if one...
42 CFR 420.303 - HHS criteria for requesting books, documents, and records.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 3 2012-10-01 2012-10-01 false HHS criteria for requesting books, documents, and... Books, Documents, and Records of Subcontractors § 420.303 HHS criteria for requesting books, documents, and records. HHS will generally request books, documents, and records from a subcontractor only if one...
42 CFR 420.303 - HHS criteria for requesting books, documents, and records.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 3 2014-10-01 2014-10-01 false HHS criteria for requesting books, documents, and... Books, Documents, and Records of Subcontractors § 420.303 HHS criteria for requesting books, documents, and records. HHS will generally request books, documents, and records from a subcontractor only if one...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... its employees or subcontractors to avoid a personal conflict of interest? 900.233 Section 900.233... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Conflicts of Interest § 900.233 When must an Indian tribe or tribal organization regulate its employees or...
25 CFR 1000.278 - Does this coverage extend to subcontractors of self-governance AFAs?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false Does this coverage extend to subcontractors of self-governance AFAs? 1000.278 Section 1000.278 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS... INDIAN SELF-DETERMINATION AND EDUCATION ACT Federal Tort Claims § 1000.278 Does this coverage extend to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... workforce. At a minimum, the subcontractor shall provide-- (A) A brief description of the types of jobs... description may rely on job titles, broader labor categories, or the subcontractor's existing practice for... funded awards of $25,000 or more, to report jobs information to the prime contractor for reporting into...
Wear Measurement of Ceramic Bearings in Gas Turbines
1990-03-01
CLASSIFICATION OF THIS PAGE UNCLASSIFIED The primary findings of the program are: a. The method for tagging Si 3N4, SiC, and M50 bearing components to depths of...for tagging Si 3 N4 , SiC, and M50 bearing components to depths of interest in bearings (1-20 microns) was developed, and subcontractors with the...1-2 SECTION 2 BACKGROUND The ball and roller bearings used in gas turbines are generally made of steels (MS0, 52100), and loss of bearing
2002-03-01
goals set forth by the Congress. The Small Business Act (15 USC 637, Public Law 85-536 (1958) established the beginnings of a program to assist...domestic small businesses in competing for Federal procurements. The small business act requires that small business concerns be afforded the maximum...the last ten years on the participation of small business subcontractors in the aerospace industry through the window of six major aerospace weapon
Federal incentives for industrial modernization: Historical review and future opportunities
NASA Technical Reports Server (NTRS)
Coleman, Sandra C.; Batson, Robert G.
1987-01-01
Concerns over the aging of the U.S. aerospace industrial base led DOD to introduce first its Technology Modernization (Tech Mod) Program, and more recently the Industrial Modernization Incentive Program (IMIP). These incentives include productivity shared savings rewards, contractor investment protection to allow for amortization of plant and equipment, and subcontractor/vendor participation. The purpose here is to review DOD IMIP and to evaluate whether a similar program is feasible for NASA and other non-DOD agencies. The IMIP methodology is of interest to industrial engineers because it provides a structured, disciplined approach to identifying productivity improvement opportunities and documenting their expected benefit. However, it is shown that more research on predicting and validating cost avoidance is needed.
NASA Technical Reports Server (NTRS)
Csomor, A.; Nielson, C. E.
1989-01-01
This program will focus on the integration of all functional disciplines of the design, manufacturing, materials, fabrication and producibility to define and demonstrate a highly reliable, easily maintained, low cost liquid methane turbopump as a component for the STBE (Space Transportation Booster Engine) using the STME (main engine) oxygen turbopump. A cost model is to be developed to predict the recurring cost of production hardware and operations. A prime objective of the program is to design the liquid methane turbopump to be used in common with a LH2 turbopump optimized for the STME. Time phasing of the effort is presented and interrelationship of the tasks is defined. Major subcontractors are identified and their roles in the program are described.
After $74-Million and Counting, Frank Gehry's Library Opens at Princeton
ERIC Educational Resources Information Center
Carlson, Scott
2008-01-01
In putting up its new, Frank Gehry-designed Lewis Library, Princeton University endured its share of challenges. It constructed models of the building to give the subcontractors a chance to practice. It fired a contractor halfway through the job when the building was past due. It learned that some subcontractors were trying to bribe their way onto…
2015-05-01
ELECTRIC BOAT CORP 798 SDB Air Force RAYTHEON CO 790 DDG 51 Navy HUNTINGTON INGALLS INC 694 DDG 51 Navy HUNTINGTON INGALLS INC 598 V22 Navy...Business Subcontractors SB subcontractors SB contracts SB dollars # % # % Amount % SDB , self identified 6 5 10 5 6,658,000 2 Woman Owned 17 15 37 17
48 CFR 952.226-70 - Subcontracting goals under section 3021(a) of the Energy Policy Act of 1992.
Code of Federal Regulations, 2014 CFR
2014-10-01
... groups. Individual goals shall be expressed in terms of a percentage of the Offeror's proposed contract... performed by each of the three groups, and, if possible, the identity of the contemplated subcontractor(s... target groups, as used in this provision means— (1) An institution of higher education that meets the...
48 CFR 952.226-70 - Subcontracting goals under section 3021(a) of the Energy Policy Act of 1992.
Code of Federal Regulations, 2013 CFR
2013-10-01
... groups. Individual goals shall be expressed in terms of a percentage of the Offeror's proposed contract... performed by each of the three groups, and, if possible, the identity of the contemplated subcontractor(s... target groups, as used in this provision means— (1) An institution of higher education that meets the...
48 CFR 952.226-70 - Subcontracting goals under section 3021(a) of the Energy Policy Act of 1992.
Code of Federal Regulations, 2012 CFR
2012-10-01
... groups. Individual goals shall be expressed in terms of a percentage of the Offeror's proposed contract... performed by each of the three groups, and, if possible, the identity of the contemplated subcontractor(s... target groups, as used in this provision means— (1) An institution of higher education that meets the...
48 CFR 952.226-70 - Subcontracting goals under section 3021(a) of the Energy Policy Act of 1992.
Code of Federal Regulations, 2011 CFR
2011-10-01
... groups. Individual goals shall be expressed in terms of a percentage of the Offeror's proposed contract... performed by each of the three groups, and, if possible, the identity of the contemplated subcontractor(s... target groups, as used in this provision means— (1) An institution of higher education that meets the...
ERIC Educational Resources Information Center
Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig
2011-01-01
This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…
Cheng, Wan-Ju; Cheng, Yawen
2016-02-01
Workplace alcohol policies are crucial for workers' health and safety. The practice of outsourcing is gaining popularity around the world and was found to be associated with poorer health in the working population. This study aimed to examine how outsourcing complicates the implementation of workplace alcohol policies and affects workers' drinking behaviors. In-depth interviews were conducted with 16 outsource workers, 3 subcontractors and 3 worksite supervisors. Information regarding workers' drinking behaviors, their knowledge, and attitudes toward workplace alcohol policy were analyzed using a qualitative thematic analysis. Factors associated with poor workplace alcohol management included smaller size and private ownership of outsourcers, subcontractors' own drinking behavior and positive attitude to alcohol, and precarious employment conditions of outsourcing workers. The multilateral relationship between outsourcers, subcontractors, and workers complicated and impaired the implementation of workplace alcohol policies. The implementation of workplace alcohol management policies was hampered in outsourcing work conditions due to poor coordination of supervisors in the subcontract chain. The enforcement of alcohol policies in the workplace should be strengthened by consolidating management responsibilities of outsourcers and subcontractors. Copyright © 2015 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Kozlovská, Mária; Struková, Zuzana
2013-06-01
Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.
Capital Investment Motivational Techniques Used by Prime Contractors on Subcontractors
1984-12-01
by block number) Productivity; Profit Policy; Subcontractors; Weighted Guidelines; Profitability; Profit 20. ABSTRACT (Continue on reverse aide If...probably productivity gains that could be made if defense contractors increased their investment [6:39]. A major deterrent to the Weighted Guideline...any profit gained would be offset to some degree by a profit loss from a reduction in profit based on costs . This result is a consequence of the cost
1989-02-01
contrac: b. Stitt b) Oklahoma L a) Motor housings, junction and switch boxes, ocher a. Arvua o be Avoided electrical equipment I b. Azau to beTreated w...REPORT DOCUMENTATION PAGE ! ,a,,mo i.,e0q 8 1. AGENCY USE ONLY ’ L -ave aianK) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED l February 1989 Final...recommendations for further action. The subcontractor effort was conducted by the following Science & Technology, Inc. (SciTek) personnel: Mr. Tracy C. Brown
Sodium-sulfur battery development. Phase VB final report, October 1, 1981--February 28, 1985
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1985-04-01
This report describes the technical progress made under Contract No. DE-AM04-79CH10012 between the U.S. Department of Energy, Ford Aerospace & Communications Corporations and Ford Motor Company, for the period 1 October 1981 through 28 February 1985, which is designated as Phase VB of the Sodium-Sulfur Battery Development Program. During this period, Ford Aerospace held prime technical responsibility and Ford Motor Company carried out supporting research. Ceramatec, Inc., was a major subcontractor to Ford Aerospace for electrolyte development and production.
2009-10-30
review of the invoices submitted in support of the GMASS contract. S PE CI AL I NS PECTO R GE NE R AL FO R I RA Q RE CO NST R UC TIO N...Command-Iraq (MNSTC- I ), using the Iraq Security Forces Fund, issued task orders for a program to assist the Iraqi Army in developing a self...its first tier subcontractor. According to contracting and MNSTC- I officials, Anham had the capability to obtain foreign military vehicle parts
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
The Department of Energy (Department) and Fluor Daniel Fernald (Fluor Daniel) implemented two work force restructurings at the Fernald Environmental Management Project between Fiscal Years (FY) 1994 and 1996. During the restructurings, the Department`s cost for temporary service subcontracts increased from $2.8 million to $9.8 million annually. The objective of this audit was to determine whether Fluor Daniel utilized temporary service agreements in an economical and efficient manner and in accordance with the policy and goals of the Department`s Work Force Restructuring Program.
2012-05-24
liability for the JLENS prope1iy damaged in an accident at a subcontractor’s facility. The accident occmTed when high winds caused an Airship ...modernization proponent for space, high - altitude and global missile defense, is the Almy operational integrator for global missile defense, and conducts...Alexandria, VA 22350-1500 Acronyms and Abbreviations AMS Airship Management Services DCMA Defense Contract
Federal Geothermal Research Program Update Fiscal Year 1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2004-02-01
The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal and Wind Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office of Geothermal and Wind Technologies. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 1999. The information contained in this Research Update illustrates howmore » the mission and goals of the Office of Geothermal and Wind Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.« less
2015-04-30
FY 2012) FSRS and FPDS data can offer information on supplier dependency. Leading purchasing textbooks (e.g., Burt, Petcavage, & Pinkerton, 2010...FSRS, may show a different level of supplier dependency. Industry Subcontractor Dependence for Large (>$100 Million) Firms (FPDS-NG, FY 2010–FY...particular goods and services these subcontractors provide could better identify what level of risk supplier failure could pose by linking them to
1982-08-01
of Dam Profile and Embankment Section 0-5-1343 Right Abutment 4 Embankment Sections Conduit and Transitions 0-5-1344 5 Embankment Sections Valley and...Cook Construction Company of Jackson, Mississippi. The drilling and grouting for the grout curtain was accomplished by subcontractor, Golden Drilling... Company of Golden, Colorado. The concrete structures for outlet works and stilling basin were done by subcontractor, Bushman Construction Company of
Orion FSW V and V and Kedalion Engineering Lab Insight
NASA Technical Reports Server (NTRS)
Mangieri, Mark L.
2010-01-01
NASA, along with its prime Orion contractor and its subcontractor s are adapting an avionics system paradigm borrowed from the manned commercial aircraft industry for use in manned space flight systems. Integrated Modular Avionics (IMA) techniques have been proven as a robust avionics solution for manned commercial aircraft (B737/777/787, MD 10/90). This presentation will outline current approaches to adapt IMA, along with its heritage FSW V&V paradigms, into NASA's manned space flight program for Orion. NASA's Kedalion engineering analysis lab is on the forefront of validating many of these contemporary IMA based techniques. Kedalion has already validated many of the proposed Orion FSW V&V paradigms using Orion's precursory Flight Test Article (FTA) Pad Abort 1 (PA-1) program. The Kedalion lab will evolve its architectures, tools, and techniques in parallel with the evolving Orion program.
Technical requirements for bioassay support services
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hickman, D.P.; Anderson, A.L.
1991-05-01
This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) bioassay program. It includes information and details that can be used as a model in providing technical contents and requirements for bioassay laboratory support, either internally or in solicitations by Geotech to obtain subcontractor laboratory support. It provides a detailed summary and description of the types of bioassay samples to be expected in support of Geotech remedial projects for the US Department of Energy and the bioassay services and analytical requirements necessary to process such samples, including required limits of sensitivity. General responsibilities of the bioassay laboratory are alsomore » addressed, including quality assurance. Peripheral information of importance to the program is included in the appendices of this document. 7 tabs.« less
Assessing drivers of export orientation in the subsea oil and gas industry.
Aarstad, Jarle; Pettersen, Inger Beate; Jakobsen, Stig-Erik
2015-01-01
The purpose of this short study was to identify the drivers of export orientation of firms in the subsea oil and gas industry in Western Norway. As the oil fields in the North Sea are approaching a stage of maturity, gaining knowledge of these drivers is crucial. An online survey was conducted of firms operating in the subsea oil and gas industry in the region. Consistent with previous research, the data reveal that product innovation and a majority share of international ownership increase firms' export rates. The use of instrumental variables indicates that both product innovation and international ownership are causes of subsea petroleum exports. The study moreover finds that subcontractors have a lower rate of direct exports than system providers, but international ownership in particular boosts subcontractors' export rates, probably by decreasing their market dependency on regional system providers. A clear recommendation for managers and stakeholders is that they should encourage foreign investments throughout the value chain. The results of such a strategy appear to be especially positive for subcontractors.
Valuation of damages to recreational trout fishing in the Upper Northeast due to acidic deposition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Englin, J.E.; Cameron, T.A.; Mendelsohn, R.E.
1991-04-01
This report documents methods used to estimate economic models of changes in recreational fishing due to the acidic deposition. The analysis was conducted by Pacific Northwest Laboratory (PNL) and its subcontractors for the US Environmental Protection Agency (EPA) and the US Department of Energy (DOE) in support of the National Acidic Precipitation Assessment Program (NAPAP). The primary data needed to estimate these models were collected in the 1989 Aquatic Based Recreation Survey (ABRS), which was jointly funded by the DOE and the EPA's Office of Policy Planning and Evaluation. 11 refs., 5 figs., 15 tabs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Virginia Finley; Sheneman, Robert S.; Levine, Jerry D.
Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratory’s Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on-site and is certified for analyzing radiological and non-radiological parameters through the New Jersey Department of Environmental Protection’s Laboratory Certification Program, Certification Number 12471. Non-radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories – QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the “Annual Site Environmental Report for 2011,” are documented and certified to be correct.
Bingham, Eula; Ringen, Knut; Dement, John; Cameron, Wilfrid; McGowan, William; Welch, Laura; Quinn, Patricia
2006-09-01
Construction workers were and are considered temporary workers at many construction sites. Since World War II, large numbers of construction workers were employed at U.S. Department of Energy nuclear weapons sites for periods ranging from a few days to over 30 years. These workers performed tasks during new construction and maintenance, repair, renovation, and demolition of existing facilities. Such tasks may involve emergency situations, and may entail opportunities for significant radiation exposures. This paper provides data from interviews with more than 750 construction workers at two gaseous diffusion plants (GDPs) at Paducah, Kentucky, and Portsmouth, Ohio regarding radiation monitoring practices. The aim was to determine the extent to which workers believed they were monitored during tasks involving potential radiation exposures. The adequacy of monitoring practices is important for two reasons: (a) Protecting workers from exposures: Construction workers were employed by sub-contractors, and may frequently been excluded from safety and health programs provided to permanent employees; and (b) Supporting claims for compensation: The Energy Employees Occupational Illness Compensation Program Act (EEOICPA) requires dose reconstruction of radiation exposures for most workers who file a claim regarding cancer. The use of monitoring data for radiation to qualify a worker means that there should be valid and complete monitoring during the work time at the various nuclear plants or workers may be unfairly denied compensation. The worker interviews from Paducah and Portsmouth were considered especially useful because these sites were designated as Special Exposure Cohorts (SECs) and the workers did not have to have a dose reconstruction to qualify for compensation for most cancers. Therefore, their responses were less likely to be affected by compensation concerns. Interview questions included asking for information regarding whether monitoring was performed, how often, and the maintenance (calibration) of monitoring equipment (devices).
Use of program logic models in the Southern Rural Access Program evaluation.
Pathman, Donald; Thaker, Samruddhi; Ricketts, Thomas C; Albright, Jennifer B
2003-01-01
The Southern Rural Access Program (SRAP) evaluation team used program logic models to clarify grantees' activities, objectives, and timelines. This information was used to benchmark data from grantees' progress reports to assess the program's successes. This article presents a brief background on the use of program logic models--essentially charts or diagrams specifying a program's planned activities, objectives, and goals--for evaluating and managing a program. It discusses the structure of the logic models chosen for the SRAP and how the model concept was introduced to the grantees to promote acceptance and use of the models. The article describes how the models helped clarify the program's objectives and helped lead agencies plan and manage the many program initiatives and subcontractors in their states. Models also provided a framework for grantees to report their progress to the National Program Office and evaluators and promoted the evaluators' visibility and acceptance by the grantees. Program logics, however, increased grantees' reporting requirements and demanded substantial time of the evaluators. Program logic models, on balance, proved their merit in the SRAP through their contributions to its management and evaluation and by providing a better understanding of the program's initiatives, successes, and potential impact.
Orbital management and design considerations for NiCd satellite power systems
NASA Technical Reports Server (NTRS)
Tausch, Benjamin J., II
1994-01-01
Several recently manufactured 50 and 60 ampere hour aerospace NiCd battery cell lots, produced by Gates Aerospace Batteries, are prone to premature on orbit performance degradation. The failure mechanism is cadmium migration, and the consequent development of soft shorts. A Martin Marietta Astronautics satellite program instituted an orbital management strategy for a set of these batteries that reduced the rate of degradation and brought the system to stable operation. This strategy involves: (1) minimizing the accumulated battery overcharge; (2) regular discharge exercises; and (3) periodic battery reconditioning. Because of changes in the NiCd cell manufacturing process, the actual performance of subsequent lots of NiCd cells is open to question. Future NiCd based power system designs should therefore allow for fine control of charge parameters, and an on orbit battery reconditioning capability. To minimize risk, it is much better to perform a full life test to qualify the cells before launch, rather than in parallel with orbital operations. If there are any changes in the manufacturing process of cells, it is extremely important to maintain very strong cognizance of secondary subcontractors, recognizing that the cell and battery manufacturing discipline is easily atrophied.
NASA Technical Reports Server (NTRS)
1995-01-01
The HEX bumper was originally developed for use with the Defensive Shields Demonstration (DSD) Program. The University of Dayton Research Institute was a subcontractor to the Martin Marietta Astronautics Group in Denver Colorado at the time the HEX bumper was designed for use on the DSD Program. The design originated at the University and was essentially made available to interested parties. All HEX bumpers used in the DSD Program were fabricated at the University by rolling sheet stock through a special set of rollers. Two pieces of 3003-H14 aluminum sheet were rolled to produce the bumpers evaluated in Shots 4-1302 and 4-1304. A brief summary of the results of these tests is given in below. Contact prints of the multiple-exposure, orthogonal view radiographs of the debris clouds produced by the tests are attached. A sketch of the HEX bumper design is also attached.
Design and Testing of CO 2 Compression Using Supersonic Shock Wave Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koopman, Aaron
This report summarizes work performed by Ramgen and subcontractors in pursuit of the design and construction of a 10 MW supersonic CO2 compressor and supporting facility. The compressor will demonstrate application of Ramgen’s supersonic compression technology at an industrial scale using CO2 in a closed-loop. The report includes details of early feasibility studies, CFD validation and comparison to experimental data, static test experimental results, compressor and facility design and analyses, and development of aerodynamic tools. A summary of Ramgen's ISC Engine program activity is also included. This program will demonstrate the adaptation of Ramgen's supersonic compression and advanced vortex combustionmore » technology to result in a highly efficient and cost effective alternative to traditional gas turbine engines. The build out of a 1.5 MW test facility to support the engine and associated subcomponent test program is summarized.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Pollution Prevention (P2) has evolved into one of DOE`s sprime strategies to meet environmental, fiscal, and worker safety obligations. P2 program planning, opportunity identification, and implementation tools were developed under the direction of the Waste Minimization Division (EM-334). Forty experts from EM, DP, ER and DOE subcontractors attended this 2-day workshop to formulate the incentives to drive utilization of these tools. Plenary and small working group sessions were held both days. Working Group 1 identified incentives to overcoming barriers in the area of P2 program planning and resource allocation. Working Group 2 identified mechanisms to drive the completion of P2more » assessments and generation of opportunities. Working Group 3 compiled and documented a broad range of potential P2 incentives that address fundamental barriers to implementation of cost effective opportunities.« less
Suspect/Counterfeit Items Information Guide for Subcontractors/Suppliers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tessmar, Nancy D.; Salazar, Michael J.
2012-09-18
Counterfeiting of industrial and commercial grade items is an international problem that places worker safety, program objectives, expensive equipment, and security at risk. In order to prevent the introduction of Suspect/Counterfeit Items (S/CI), this information sheet is being made available as a guide to assist in the implementation of S/CI awareness and controls, in conjunction with subcontractor's/supplier's quality assurance programs. When it comes to counterfeit goods, including industrial materials, items, and equipment, no market is immune. Some manufactures have been known to misrepresent their products and intentionally use inferior materials and processes to manufacture substandard items, whose properties can significantlymore » cart from established standards and specifications. These substandard items termed by the Department of Energy (DOE) as S/CI, pose immediate and potential threats to the safety of DOE and contractor workers, the public, and the environment. Failure of certain systems and processes caused by an S/CI could also have national security implications at Los Alamos National Laboratory (LANL). Nuclear Safety Rules (federal Laws), DOE Orders, and other regulations set forth requirements for DOE contractors to implement effective controls to assure that items and services meet specified requirements. This includes techniques to implement and thereby minimizing the potential threat of entry of S/CI to LANL. As a qualified supplier of goods or services to the LANL, your company will be required to establish and maintain effective controls to prevent the introduction of S/CI to LANL. This will require that your company warrant that all items (including their subassemblies, components, and parts) sold to LANL are genuine (i.e. not counterfeit), new, and unused, and conform to the requirements of the LANL purchase orders/contracts unless otherwise approved in writing to the Los Alamos National Security (LANS) contract administrator/procurements specialist.« less
Management involvement with compliance: when distributive management fails, everyone pays.
Goldman, D S
1995-12-01
In this article I discuss the importance of management retaining and exercising its responsibilities for control over studies, especially studies that have been distributed to contractors and subcontractors, hence the title, "Distributive Management." While the clearest examples for distributive management are found in environmental fate and crop residue studies for EPA, similar examples may be found in contemporary toxicology and carcinogenicity studies. The cost of failure to exercise control over contracted studies has been estimated by the EPA at between $600 M and $1,200 M. These are costs that will be borne by the public through higher prices and higher taxes.
Insurance and indemnification implications of future space projects
NASA Technical Reports Server (NTRS)
O'Brien, John E.
1987-01-01
NASA options regarding insurance and indemnification policies as they relate to NASA customers and contractors are described. The foundation for the discussion is the way in which NASA is planning to return the Space Shuttle fleet to safe flight as well as current U.S. policy concerning future uses of the Shuttle fleet. Issues discussed include: the nature of the Shuttle manifest; the policy regarding property damage or destruction; insurance against liability to third parties; the reduction of the scope of the risk to be insured; NASA as the insurer; a sharing arrangement between the user and NASA; and contractors and subcontractors involved in Shuttle operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nabeel Riza
In this program, Nuonics, Inc. has studied the fundamentals of a new Silicon Carbide (SiC) materials-based optical sensor technology suited for extreme environments of coal-fired engines in power production. The program explored how SiC could be used for sensing temperature, pressure, and potential gas species in a gas turbine environment. The program successfully demonstrated the optical designs, signal processing and experimental data for enabling both temperature and pressure sensing using SiC materials. The program via its sub-contractors also explored gas species sensing using SiC, in this case, no clear commercially deployable method was proven. Extensive temperature and pressure measurement datamore » using the proposed SiC sensors was acquired to 1000 deg-C and 40 atms, respectively. Importantly, a first time packaged all-SiC probe design was successfully operated in a Siemens industrial turbine rig facility with the probe surviving the harsh chemical, pressure, and temperature environment during 28 days of test operations. The probe also survived a 1600 deg-C thermal shock test using an industrial flame.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, Bruce G
2006-09-29
Since 1998, The Pennsylvania State University has been successfully managing the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by Penn State, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350.more » This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes Penn State and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. Base funding for the selected projects is provided by NETL with matching funds from industry. At the annual funding meeting held in October 2003, ten projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten 2004 projects were completed during the previous annual reporting period and their final reports were submitted with the previous annual report (i.e., 10/01/04-09/30/05). The final report for the remaining project, which was submitted during this reporting period (i.e., 10/01/05-09/30/06), is attached. At the annual funding meeting held in November 2004, eleven projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2005. Three additional projects were selected for funding during the April 2005 tutorial/funding meeting. Subcontracts were let from Penn State to the subcontractors on July 1, 2005. Of these fourteen 2005 projects, eleven have been completed and the final reports are attached. An annual funding meeting was held in November 2005 and the council selected five projects for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2006, except for one that started October 1, 2006.« less
Low Loss Graded Index Polymer Optical Fiber for Local Networking
DOE Office of Scientific and Technical Information (OSTI.GOV)
Claus, Richard Otto
The objective of this Department of Energy SBIR program has been to develop technology for the advancement of advanced computing systems. NanoSonic worked with two subcontractors, the Polymicro Division of Molex, a U.S.-based manufacturer of specialized optical fiber and fiber components, and Virginia Tech, a research university involved through the Global Environment for Network Innovations (GENI) program in high-speed computer networking research. NanoSonic developed a patented molecular-level self-assembly process to manufacture polymer-based optical fibers in a way similar to the modified chemical vapor deposition (MCVD) approach typically used to make glass optical fibers. Although polymer fiber has a higher attenuationmore » per unit length than glass fiber, short connectorized polymer fiber jumpers offer significant cost savings over their glass counterparts, particularly due to the potential use of low-cost plastic fiber connectors. As part of the SBIR commercialization process, NanoSonic exclusively licensed this technology to a large ($100B+ market cap) U.S.-based manufacturing conglomerate near the end of the first year of the Phase II program. With this base technology developed and licensed, NanoSonic then worked with Polymicro to address secondary program goals of using related but not conflicting production methods to enhance the performance of other specialty optical fiber products and components, and Virginia Tech continued its evaluation of developed polymer fibers in its network infrastructure system on the university campus. We also report our current understanding of the observation during the Phase I program of quantum conductance and partial quantum conductance in metal-insulator-metal (MIM) devices. Such conductance behavior may be modeled as singlemode behavior in one-dimensional electrically conducting waveguides, similar in principle to singlemode optical propagation in dielectric fiber waveguides. Although NanoSonic has not licensed any of the additional technology developed during the second year of the program, several proprietary discussions with major materials companies are underway as of the conclusion of Phase II.« less
2007-07-09
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. In this HD video image, an Ares I x-test involves the upper stage separating from the first stage. This particular test was conducted at the NASA Langley Research Center in July 2007. (Highest resolution available)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-04-01
The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology.more » We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.« less
NASA Technical Reports Server (NTRS)
Sampson, Paul G.; Sny, Linda C.
1992-01-01
The Air Force has numerous on-going manufacturing and integration development programs (machine tools, composites, metals, assembly, and electronics) which are instrumental in improving productivity in the aerospace industry, but more importantly, have identified strategies and technologies required for the integration of advanced processing equipment. An introduction to four current Air Force Manufacturing Technology Directorate (ManTech) manufacturing areas is provided. Research is being carried out in the following areas: (1) machining initiatives for aerospace subcontractors which provide for advanced technology and innovative manufacturing strategies to increase the capabilities of small shops; (2) innovative approaches to advance machine tool products and manufacturing processes; (3) innovative approaches to advance sensors for process control in machine tools; and (4) efforts currently underway to develop, with the support of industry, the Next Generation Workstation/Machine Controller (Low-End Controller Task).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bretzke, John C.
The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed tomore » a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.« less
Metrology: Measurement Assurance Program Guidelines
NASA Technical Reports Server (NTRS)
Eicke, W. G.; Riley, J. P.; Riley, K. J.
1995-01-01
The 5300.4 series of NASA Handbooks for Reliability and Quality Assurance Programs have provisions for the establishment and utilization of a documented metrology system to control measurement processes and to provide objective evidence of quality conformance. The intent of these provisions is to assure consistency and conformance to specifications and tolerances of equipment, systems, materials, and processes procured and/or used by NASA, its international partners, contractors, subcontractors, and suppliers. This Measurement Assurance Program (MAP) guideline has the specific objectives to: (1) ensure the quality of measurements made within NASA programs; (2) establish realistic measurement process uncertainties; (3) maintain continuous control over the measurement processes; and (4) ensure measurement compatibility among NASA facilities. The publication addresses MAP methods as applied within and among NASA installations and serves as a guide to: control measurement processes at the local level (one facility); conduct measurement assurance programs in which a number of field installations are joint participants; and conduct measurement integrity (round robin) experiments in which a number of field installations participate to assess the overall quality of particular measurement processes at a point in time.
Federal Geothermal Research Program Update Fiscal Year 2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2003-09-01
The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in themore » United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.« less
Advanced Turbine Technology Applications Project (ATTAP)
NASA Technical Reports Server (NTRS)
1991-01-01
This report summarizes work performed in support of the development and demonstration of a structural ceramic technology for automotive gas turbine engines. The AGT101 regenerated gas turbine engine developed under the previous DOE/NASA Advanced Gas Turbine (AGT) program is being utilized for verification testing of the durability of next-generation ceramic components and their suitability for service at reference powertrain design conditions. Topics covered in this report include ceramic processing definition and refinement, design improvements to the test bed engine and test rigs, and design methodologies related to ceramic impact and fracture mechanisms. Appendices include reports by ATTAP subcontractors addressing the development of silicon nitride and silicon carbide families of materials and processes.
Federal Geothermal Research Program Update Fiscal Year 2003
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2004-03-01
The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office. The goals are: (1) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; (2) Double the number of States with geothermal electric power facilities to eight by 2006; and (3) Supply the electricalmore » power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2003. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.« less
Annual program analysis of the NASA Space Life Sciences Research and Education Support Program
NASA Technical Reports Server (NTRS)
1994-01-01
The basic objectives of this contract are to stimulate, encourage, and assist research and education in NASA life sciences. Scientists and experts from a number of academic and research institutions in this country and abroad are recruited to support NASA's need to find a solution to human physiological problems associated with living and working in space and on extraterrestrial bodies in the solar system. To fulfill the contract objectives, a cadre of staff and visiting scientists, consultants, experts, and subcontractors has been assembled into a unique organization dedicated to the space life sciences. This organization, USRA's Division of Space Life Sciences, provides an academic atmosphere, provides an organizational focal point for science and educational activities, and serves as a forum for the participation of eminent scientists in the biomedical programs of NASA. The purpose of this report is to demonstrate adherence to the requirement of Contract NAS9-18440 for a written review and analysis of the productivity and success of the program. In addition, this report makes recommendations for future activities and conditions to further enhance the objectives of the program and provides a self-assessment of the cost performance of the contract.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nekoogar, F; Martz, Jr., H E
2009-09-23
The purpose of this statement of work is for third party collaborators to train, validate and have Lawrence Livermore National Security, LLC (LLNS) evaluate algorithms to detect liquid threats in digital radiography (DR)/TIP Ready X-ray (TRX) images that will be provided by LLNS through the Transportation and Security Administration (TSA). LLNS will provide a set of images with threat(s) to determine detection rates and non-threat images from airports to determine false alarm rates. A key including a bounding box showing the locations of the threats and non-threats will be provided for the images. It is expected that the Subcontractor shallmore » use half of the images with their keys for training the algorithms and the other half shall be used for validation (third party evaluation) purposes. The Subcontractor shall not use the key to the second half of the data other than for the validation and reporting of the performance of its algorithm (not for training). The Subcontractor has 45 business days from the receipt of datasets and the Subcontract to: (1) Run their detection/classification algorithms on the data; (2) Deliver a final report describing their performance by generating Receiver Operator Characteristic (ROC) curves using their algorithm; and (3) Deliver a copy of the third party's executable software (already trained and validated by the datasets) to LLNL accompanied by a user manual. LLNS will evaluate the performance of the same algorithm on another separate set of data. LLNS evaluation of the Subcontractor's algorithm will be documented in a final report within 30 days of receiving the executable code. This report will be sent to TSA and the report may be disseminated to the Subcontract at TSA's discretion.« less
State Technologies Advancement Collaborative
DOE Office of Scientific and Technical Information (OSTI.GOV)
David S. Terry
2012-01-30
The U. S. Department of Energy (DOE), National Association of State Energy Officials (NASEO), and Association of State Energy Research and Technology Transfer Institutions (ASERTTI) signed an intergovernmental agreement on November 14, 2002, that allowed states and territories and the Federal Government to better collaborate on energy research, development, demonstration and deployment (RDD&D) projects. The agreement established the State Technologies Advancement Collaborative (STAC) which allowed the states and DOE to move RDD&D forward using an innovative competitive project selection and funding process. A cooperative agreement between DOE and NASEO served as the contracting instrument for this innovative federal-state partnership obligatingmore » funds from DOE's Office of Energy Efficiency and Renewable Energy and Office of Fossil Energy to plan, fund, and implement RDD&D projects that were consistent with the common priorities of the states and DOE. DOE's Golden Field Office provided Federal oversight and guidance for the STAC cooperative agreement. The STAC program was built on the foundation of prior Federal-State efforts to collaborate on and engage in joint planning for RDD&D. Although STAC builds on existing, successful programs, it is important to note that it was not intended to replace other successful joint DOE/State initiatives such as the State Energy Program or EERE Special Projects. Overall the STAC process was used to fund, through three competitive solicitations, 35 successful multi-state research, development, deployment, and demonstration projects with an overall average non-federal cost share of 43%. Twenty-two states were awarded at least one prime contract, and organizations in all 50 states and some territories were involved as subcontractors in at least one STAC project. Projects were funded in seven program areas: (1) Building Technologies, (2) Industrial Technologies, (3) Transportation Technologies, (4) Distributed Energy Resources, (5) Hydrogen Technology Learning Centers, (6) Fossil Energy, and (7) Rebuild America.« less
NASA Technical Reports Server (NTRS)
1992-01-01
The George M. Low Trophy is awarded to current NASA contractors, subcontractors, and suppliers in the aerospace industry who have demonstrated sustained excellence and outstanding achievements in quality and productivity for three or more years. The objectives of the award are to increase public awareness of the importance of quality and productivity to the Nation's aerospace program and industry in general; encourage domestic business to continue efforts to enhance quality, increase productivity, and thereby strengthen competitiveness; and provide the means for sharing the successful methods and techniques used by the applicants with other American enterprises. Information is given on candidate eligibility for large businesses, the selection process, the nomination letter, and the application report.
Code of Federal Regulations, 2011 CFR
2011-04-01
... duly authorized representatives, shall have access to any books, documents, papers, and records of the... Corps deliverers, or their subcontractors using Federal auditors or independent public accountants. Such...
Code of Federal Regulations, 2012 CFR
2012-04-01
... duly authorized representatives, shall have access to any books, documents, papers, and records of the... Corps deliverers, or their subcontractors using Federal auditors or independent public accountants. Such...
Darragh, Amy Rowntree; Stallones, Lorann; Bigelow, Phillip L; Keefe, Thomas J
2004-02-01
The construction industry typically has one of the highest fatal and non-fatal injury rates compared with other industries. Residential construction workers are at particular risk of injury (work is in remote sites with small crews, there are often many subcontractors, and they have limited access to safety programs). Difficulty accessing information specific to this group has made research more challenging, therefore, there are few studies. This study evaluated the effectiveness of the HomeSafe Pilot Program, a safety education and training program designed to reduce injuries among residential construction workers. Researchers evaluated whether overall and severe injury incidence rates declined during the intervention period. Data were analyzed using incidence rates and Poisson regression to control for the effect of antecedent secular trend. Injury incidence rates declined significantly following HomeSafe; however, this effect was not statistically significant once temporal variation was controlled. The decline in injury rates following HomeSafe cannot be attributed solely to HomeSafe, however, programmatic and methodologic limitations contributed to the inconclusive results. Further research into the hazards faced by residential construction workers is needed. Am. J. Ind. Med. 45:210-217, 2004. Copyright 2004 Wiley-Liss, Inc.
Guided school visits to natural history museums in Israel: Teachers' roles
NASA Astrophysics Data System (ADS)
Tal, Revital; Bamberger, Yael; Morag, Orly
2005-11-01
Museums are favorite and respected resources for learning worldwide. In Israel, there are two relatively large science centers and a number of small natural history museums that are visited by thousands of students. Unlike other countries, studying museum visits in Israel only emerges in the last few years. The study focused on the roles and perceptions of teachers, who visited four natural history museums with their classes. The study followed previous studies that aimed at understanding the role teachers play in class visits to museums (Griffin & Symington, 1997, Science Education, 81, 763-779; Cox-Petersen et al., 2003, Journal of Research in Science Teaching, 40, 200-218; Olsen, Cox-Petersen, & McComas, 2001, Journal of Science Teacher Education, 12, 155-173) and emphasized unique phenomena related to the Israeli system. None of the teachers interviewed for this study was an active facilitator, and in many cases the teachers had no idea regarding the field trip program and rationale. Our main findings support previous studies that indicated that teachers are hardly involved in planning and enacting the museum visit. An issue of concern, which came up in this study, is the tendency of Israeli schools to use subcontractor companies that plan and make all the museum arrangements. Unlike the common patterns described in the paper, a case study of unique teacher's function is presented as well.
48 CFR 49.108-3 - Settlement procedure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-3 Settlement procedure. (a) Contractors shall settle with subcontractors in general conformity with the policies and principles relating to settlement...
48 CFR 244.202-2 - Considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent to Subcontracts 244.202-2 Considerations. (a) Where other than lowest price is the basis for subcontractor selection, has...
48 CFR 2052.215-75 - Proposal presentation and format.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., education, and employment history of its employees, subcontractor personnel, and consultants, through... and categories, materials, subcontracts, travel, computer time, etc., must be included so that the...
Overview 2004 of NASA-Stirling Convertor CFD Model Development and Regenerator R and D Efforts
NASA Technical Reports Server (NTRS)
Tew, Roy C.; Dyson, Rodger W.; Wilson, Scott D.; Demko, Rikako
2004-01-01
This paper reports on accomplishments in 2004 in (1) development of Stirling-convertor CFD models at NASA Glenn and via a NASA grant, (2) a Stirling regenerator-research effort being conducted via a NASA grant (a follow-on effort to an earlier DOE contract), and (3) a regenerator-microfabrication contract for development of a "next-generation Stirling regenerator." Cleveland State University is the lead organization for all three grant/contractual efforts, with the University of Minnesota and Gedeon Associates as subcontractors. Also, the Stirling Technology Company and Sunpower, Inc. are both involved in all three efforts, either as funded or unfunded participants. International Mezzo Technologies of Baton Rouge, Louisiana is the regenerator fabricator for the regenerator-microfabrication contract. Results of the efforts in these three areas are summarized.
48 CFR 1602.170-15 - Subcontractor.
Code of Federal Regulations, 2012 CFR
2012-10-01
... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL DEFINITIONS OF WORDS AND TERMS Definitions of FEHBP... of direct medical services or supplies pursuant to the Carrier's health benefits plan. [52 FR 16038...
48 CFR 49.002 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... completed articles or work at the contract price and amounts for the settlement of subcontractor settlement proposals. Credits for retention or other disposal of termination inventory and amounts for advance or...
48 CFR 215.404-71-5 - Cost efficiency factor.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Subcontractor cost reduction efforts; (7) The contractor's effective incorporation of commercial items and... contracting officer shall consider the impact that quantity differences, learning, changes in scope, and...
48 CFR 215.404-71-5 - Cost efficiency factor.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Subcontractor cost reduction efforts; (7) The contractor's effective incorporation of commercial items and... contracting officer shall consider the impact that quantity differences, learning, changes in scope, and...
48 CFR 215.404-71-5 - Cost efficiency factor.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Subcontractor cost reduction efforts; (7) The contractor's effective incorporation of commercial items and... contracting officer shall consider the impact that quantity differences, learning, changes in scope, and...
48 CFR 215.404-71-5 - Cost efficiency factor.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Subcontractor cost reduction efforts; (7) The contractor's effective incorporation of commercial items and... contracting officer shall consider the impact that quantity differences, learning, changes in scope, and...
Subcontractor Fairness Act of 2009
Rep. Clay, Wm. Lacy [D-MO-1
2009-11-19
House - 02/12/2010 Referred to the Subcommittee on Government Management, Organization, and Procurement. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
SOFIA Program SE and I Lessons Learned
NASA Technical Reports Server (NTRS)
Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.
2011-01-01
Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.
NASA Technical Reports Server (NTRS)
Rogers, J. L., Jr.
1973-01-01
The NASTRAN computer program is capable of executing on three different types of computers: (1) the CDC 6000 series, (2) the IBM 360-370 series, and (3) the Univac 1100 series. A typical activity requiring transfer of data between dissimilar computers is the analysis of a large structure such as the space shuttle by substructuring. Models of portions of the vehicle which have been analyzed by subcontractors using their computers must be integrated into a model of the complete structure by the prime contractor on his computer. Presently the transfer of NASTRAN matrices or tables between two different types of computers is accomplished by punched cards or a magnetic tape containing card images. These methods of data transfer do not satisfy the requirements for intercomputer data transfer associated with a substructuring activity. To provide a more satisfactory transfer of data, two new programs, RDUSER and WRTUSER, were created.
Code of Federal Regulations, 2012 CFR
2012-10-01
...); (B) Call attention to the labor standards requirements in the contract which relate to— (1...) It is necessary to determine whether the contractor and its subcontractors intend to pay any required...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 29, CFR); and (5) Executive Order 11246 (Equal Employment Opportunity); (B) Call attention to the... determine whether the contractor and its subcontractors intend to pay any required fringe benefits in the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 29, CFR); and (5) Executive Order 11246 (Equal Employment Opportunity); (B) Call attention to the... determine whether the contractor and its subcontractors intend to pay any required fringe benefits in the...
Code of Federal Regulations, 2014 CFR
2014-10-01
...); (B) Call attention to the labor standards requirements in the contract which relate to— (1...) It is necessary to determine whether the contractor and its subcontractors intend to pay any required...
Code of Federal Regulations, 2013 CFR
2013-10-01
...); (B) Call attention to the labor standards requirements in the contract which relate to— (1...) It is necessary to determine whether the contractor and its subcontractors intend to pay any required...
Bangladesh's SMP earns top marks.
1984-01-01
A recent evaluation funded by the US Agency for International Development (AID) confirms that Bangladesh's contraceptive social marketing program has exceeded its planner's goals and demonstrated the ability of such a system to widely distribute contraceptive products at a low cost. The project, which began contraceptive sales in 1975, distributes condoms, oral contraceptives, and foaming vaginal tablets. Almost 25% of contraceptive users in Bangladesh are serviced by the social marketing program. By the end of 1983, the program was providing 1,022,000 couple years of protection; this included 84 million condoms, 1.7 million pill cycles, and 5.1 million spermicidal tablets each year. The program's cost for 1 couple year of protection is US$1.66. Social marketing sales have accounted for all increases in couple years of protection experienced by the country's national population program since 1975. Sales have been boosted by recent efforts to draw rural medical practitioners into family planning activities. Mobile film units have further increased sales. The USAID report identifies 3 elements that have spearheaded the social marketing program's achievements: 1) the existence of a committed core management team, 2) the granting of autonomy to make daily decisions to this management team, and 3) central control fo the product distribution system by management rather than by subcontractors. Overall, the social marketing program is credited with legitimizing discussion of contraception in a country formerly considered too conservative to tolerate open product promotion.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waite, J.L.
1996-04-12
This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less
48 CFR 30.607 - Subcontract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...
Camp Minden Fact Sheet July 2015
The Louisiana Military Department (LMD) led a Community Meeting on June 30, 2015. The LMD contractor, Explosive Service Intl., and its subcontractor El Dorado Engineering, presented details of Contained Burn System (CBS).
... prohibits discrimination on the basis of age by contractors and subcontractors in the perform- ance of Federal ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...
NASA Technical Reports Server (NTRS)
Workman, Gary L
1992-01-01
Recent issues emerging in our fiscal and ecological environments have promulgated that federal agencies shall promote activities which respond to the improvement of both. In response to these developments, the National Aeronautics and Space Administration (NASA) has undertaken an innovative approach to improve the control of materials used in all NASA manufacturing activities. In concert with this goal, NASA is requiring that its contractors and their sub-contractors perform a more intensive consolidation of technologies that can provide an accounting of materials, which includes in-coming materials, materials in process, end-products and waste materials. The purpose of this handbook is to provide guidelines to NASA and its contractor personnel for the planning and implementation of chemical fingerprinting programs and to illustrate the chemical and statistical fundamentals needed for successful use of chemical fingerprinting.
NASA Technical Reports Server (NTRS)
1992-01-01
The George M. Low Trophy is awarded to current NASA contractors, subcontractors, and suppliers in the aerospace industry who have demonstrated sustained excellence and outstanding achievements in quality and productivity for three or more years. The objectives of the award are to increase public awareness of the importance of quality and productivity to the Nation's aerospace program and industry in general; encourage domestic business to continue efforts to enhance quality, increase productivity, and thereby strengthen competitiveness; and provide the means for sharing the successful methods and techniques used by the applicants with other American enterprises. Information is given on candidate eligibility for large businesses, the selection process, the nomination letter, and the application report. The 1992 highlights and recipients are included.
NASA Technical Reports Server (NTRS)
1977-01-01
ELDEC Corp., Lynwood, Wash., built a weight-recording system for logging trucks based on electronic technology the company acquired as a subcontractor on space programs such as Apollo and the Saturn launch vehicle. ELDEC employed its space-derived expertise to develop a computerized weight-and-balance system for Lockheed's TriStar jetliner. ELDEC then adapted the airliner system to a similar product for logging trucks. Electronic equipment computes tractor weight, trailer weight and overall gross weight, and this information is presented to the driver by an instrument in the cab. The system costs $2,000 but it pays for itself in a single year. It allows operators to use a truck's hauling capacity more efficiently since the load can be maximized without exceeding legal weight limits for highway travel. Approximately 2,000 logging trucks now use the system.
2011-07-14
CAPE CANAVERAL, Fla. -- In the Delta turn basin at Cape Canaveral Air Force Station in Florida, United Space Alliance (USA) divers and boat crew monitor an Orion test article while waiting for its lift bags to inflate. The uprighting tests are part of USA's research and development program to help develop ground operations support equipment that could be used to reorient and recover an uncrewed Orion flight test capsule after splashdown. USA is a major subcontractor to Lockheed Martin for the Orion spacecraft. The Orion Multi-Purpose Crew Vehicle is NASA's next-generation spacecraft designed for deep space missions to asteroids, moons and other interplanetary destinations throughout the solar system. Orion's first uncrewed orbital flight test is slated for 2013. For more information, visit http://www.nasa.gov/exploration/systems/mpcv/. Photo credit: NASA/Frankie Martin
2011-07-14
CAPE CANAVERAL, Fla. -- In the Delta turn basin at Cape Canaveral Air Force Station in Florida, United Space Alliance (USA) divers and boat crew tend an Orion test article while waiting for its lift bags to inflate. The uprighting tests are part of USA's research and development program to help develop ground operations support equipment that could be used to reorient and recover an uncrewed Orion flight test capsule after splashdown. USA is a major subcontractor to Lockheed Martin for the Orion spacecraft. The Orion Multi-Purpose Crew Vehicle is NASA's next-generation spacecraft designed for deep space missions to asteroids, moons and other interplanetary destinations throughout the solar system. Orion's first uncrewed orbital flight test is slated for 2013. For more information, visit http://www.nasa.gov/exploration/systems/mpcv/. Photo credit: NASA/Frankie Martin
15 CFR 700.3 - Priority ratings and rated orders.
Code of Federal Regulations, 2013 CFR
2013-01-01
... for items that the person normally supplies. The existence of previously accepted unrated or lower... contractor to subcontractor to suppliers throughout the procurement chain. (e) Persons may place a priority...
15 CFR 700.3 - Priority ratings and rated orders.
Code of Federal Regulations, 2012 CFR
2012-01-01
... for items that the person normally supplies. The existence of previously accepted unrated or lower... contractor to subcontractor to suppliers throughout the procurement chain. (e) Persons may place a priority...
15 CFR 700.3 - Priority ratings and rated orders.
Code of Federal Regulations, 2014 CFR
2014-01-01
... for items that the person normally supplies. The existence of previously accepted unrated or lower... contractor to subcontractor to suppliers throughout the procurement chain. (e) Persons may place a priority...
15 CFR 700.3 - Priority ratings and rated orders.
Code of Federal Regulations, 2011 CFR
2011-01-01
... for items that the person normally supplies. The existence of previously accepted unrated or lower... contractor to subcontractor to suppliers throughout the procurement chain. (e) Persons may place a priority...
15 CFR 700.3 - Priority ratings and rated orders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... for items that the person normally supplies. The existence of previously accepted unrated or lower... contractor to subcontractor to suppliers throughout the procurement chain. (e) Persons may place a priority...
Strontium-90 Error Discovered in Subcontract Laboratory Spreadsheet
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. D. Brown A. S. Nagel
1999-07-31
West Valley Demonstration Project health physicists and environment scientists discovered a series of errors in a subcontractor's spreadsheet being used to reduce data as part of their strontium-90 analytical process.
Delicious Heart-Healthy Latino Recipes
... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...
Veterans' Employment and Training Service
... Veterans Employment Center Veterans' Preference VETS-4212 Federal Contractor Reporting Women Who Served USERRA USERRA protects civilian ... Strategies for Successfully Removing Barriers. VETS-4212 Federal Contractor Reporting Federal contractors and subcontractors annually track and ...
48 CFR 52.217-2 - Cancellation Under Multiyear Contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... precluded anticipated benefits of Contractor or subcontractor learning. (g) The claim shall not include— (1...) This contract may include an Option clause with the period for exercising the option limited to the...
48 CFR 52.222-7 - Withholding of Funds.
Code of Federal Regulations, 2012 CFR
2012-10-01
... mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic...
48 CFR 52.222-7 - Withholding of Funds.
Code of Federal Regulations, 2011 CFR
2011-10-01
... mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic...
48 CFR 52.222-7 - Withholding of Funds.
Code of Federal Regulations, 2013 CFR
2013-10-01
... mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic...
48 CFR 52.222-7 - Withholding of Funds.
Code of Federal Regulations, 2010 CFR
2010-10-01
... mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., laboratory, office building or other area utilized by the DOE or its contractors or subcontractors for the..., previously referred to as a “security inspector.” Special response team member. A security police officer who...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., laboratory, office building or other area utilized by the DOE or its contractors or subcontractors for the..., previously referred to as a “security inspector.” Special response team member. A security police officer who...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., laboratory, office building or other area utilized by the DOE or its contractors or subcontractors for the..., previously referred to as a “security inspector.” Special response team member. A security police officer who...
77 FR 44045 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-60; Introduction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-26
... the United States Defense Advanced Research Projects Agency (DARPA) to the list of agencies that have... taxation of Government cost-reimbursement contracts when contractors and their subcontractors purchase...
Asthma & Physical Activity in the School
... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor may discriminate against any employee or applicant for ...
Families Finding the Balance: A Parent Handbook
... prohibits discrimination on the basis of age by contractors and subcontractors in the performance of Federal contracts, ... Executive Order 11246 states that no federally funded contractor my discriminate against any employee or applicant for ...
42 CFR 81.4 - Definition of terms used in this part.
Code of Federal Regulations, 2012 CFR
2012-10-01
... who is or was an employee of DOE, a DOE contractor or subcontractor, or an atomic weapons employer... length. High LET radiation includes alpha particles and neutrons, which have weaker penetrating...
42 CFR 81.4 - Definition of terms used in this part.
Code of Federal Regulations, 2014 CFR
2014-10-01
... who is or was an employee of DOE, a DOE contractor or subcontractor, or an atomic weapons employer... length. High LET radiation includes alpha particles and neutrons, which have weaker penetrating...
42 CFR 81.4 - Definition of terms used in this part.
Code of Federal Regulations, 2013 CFR
2013-10-01
... who is or was an employee of DOE, a DOE contractor or subcontractor, or an atomic weapons employer... length. High LET radiation includes alpha particles and neutrons, which have weaker penetrating...
Contracting with the Frederick National Lab | FNLCR Staging
Our Acquisitions Directorate supports the national laboratory with high quality products and services to achieve its national mission. In addition to engaging large subcontractors, we are also committed to working with small businesses, minority- and
48 CFR 252.215-7000 - Pricing adjustments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... clauses entitled “Price Reduction for Defective Cost or Pricing Data—Modifications,” “Subcontractor Cost... increases and/or decreases in cost plus applicable profits. (End of clause) [56 FR 36479, July 31, 1991, as...
48 CFR 1552.211-73 - Level of effort-cost-reimbursement term contract.
Code of Federal Regulations, 2011 CFR
2011-10-01
... programmers and not support personnel such as company management, typists, and key punch operators even though... specified in paragraph (a) includes Contractor, subcontractor, and consultant labor hours. (c) If the...
VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE ...
VIEW OF BUILDING 122 EXAMINATION FACILITIES THAT SUPPORT ROUTINE EMPLOYEE AND SUBCONTRACTOR PHYSICAL EXAMINATIONS. (10/85) - Rocky Flats Plant, Emergency Medical Services Facility, Southwest corner of Central & Third Avenues, Golden, Jefferson County, CO
Practices and technologies in hazardous material transportation and security.
DOT National Transportation Integrated Search
2011-11-23
"The University of Arkansas (UA) team is responsible for investigating practices of : hazardous material transportation in the private sector. The UA team is a subcontractor : to the project Petrochemical Transportation Security, Development of...
48 CFR 2152.070 - Applicable clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Defective Cost or Pricing Data 52.215-12Subcontractor Cost or Pricing Data 52.215-15Pension Adjustments and...-23Assignment of Claims 52.232-33Payment by Electronic Funds Transfer—Central Contractor Registration 52.233...
NASA Astrophysics Data System (ADS)
McCrea, Terry
The Shuttle Processing Contract (SPC) workforce consists of Lockheed Space Operations Co. as prime contractor, with Grumman, Thiokol Corporation, and Johnson Controls World Services as subcontractors. During the design phase, reliability engineering is instrumental in influencing the development of systems that meet the Shuttle fail-safe program requirements. Reliability engineers accomplish this objective by performing FMEA (failure modes and effects analysis) to identify potential single failure points. When technology, time, or resources do not permit a redesign to eliminate a single failure point, the single failure point information is formatted into a change request and presented to senior management of SPC and NASA for risk acceptance. In parallel with the FMEA, safety engineering conducts a hazard analysis to assure that potential hazards to personnel are assessed. The combined effort (FMEA and hazard analysis) is published as a system assurance analysis. Special ground rules and techniques are developed to perform and present the analysis. The reliability program at KSC is vigorously pursued, and has been extremely successful. The ground support equipment and facilities used to launch and land the Space Shuttle maintain an excellent reliability record.
Promon's participation in the Brasilsat program: first & second generations
NASA Astrophysics Data System (ADS)
Depaiva, Ricardo N.
This paper presents an overview of the Brasilsat program, space and ground segments, developed by Hughes and Promon. Promon is a Brazilian engineering company that has been actively participating in the Brasilsat Satellite Telecommunications Program since its beginning. During the first generation, as subcontractor of the Spar/Hughes/SED consortium, Promon had a significant participation in the site installation of the Ground Segment, including the antennas. During the second generation, as partner of a consortium with Hughes, Promon participated in the upgrade of Brasilsat's Ground Segment systems: the TT&C (TCR1, TCR2, and SCC) and the COCC (Communications and Operations Control Center). This upgrade consisted of the design and development of hardware and software to support the second generation requirements, followed by integration and tests, factory acceptance tests, transport to site, site installation, site acceptance tests and warranty support. The upgraded systems are distributed over four sites with remote access to the main ground station. The solutions adopted provide a high level of automation, and easy operator interaction. The hardware and software technologies were selected to provide the flexibility to incorporate new technologies and services from the demanding satellite telecommunications market.
Solid Oxide Fuel Cells Operating on Alternative and Renewable Fuels
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Xiaoxing; Quan, Wenying; Xiao, Jing
2014-09-30
This DOE project at the Pennsylvania State University (Penn State) initially involved Siemens Energy, Inc. to (1) develop new fuel processing approaches for using selected alternative and renewable fuels – anaerobic digester gas (ADG) and commercial diesel fuel (with 15 ppm sulfur) – in solid oxide fuel cell (SOFC) power generation systems; and (2) conduct integrated fuel processor – SOFC system tests to evaluate the performance of the fuel processors and overall systems. Siemens Energy Inc. was to provide SOFC system to Penn State for testing. The Siemens work was carried out at Siemens Energy Inc. in Pittsburgh, PA. Themore » unexpected restructuring in Siemens organization, however, led to the elimination of the Siemens Stationary Fuel Cell Division within the company. Unfortunately, this led to the Siemens subcontract with Penn State ending on September 23rd, 2010. SOFC system was never delivered to Penn State. With the assistance of NETL project manager, the Penn State team has since developed a collaborative research with Delphi as the new subcontractor and this work involved the testing of a stack of planar solid oxide fuel cells from Delphi.« less
Code of Federal Regulations, 2011 CFR
2011-01-01
... such enterprises in participating fully in research, development, demonstration and contract activities...-tier subcontractors of DOE operating contractors in furtherance of the research, development... extent funds are provided in advance in appropriation acts. This regulation implements the authority for...
Code of Federal Regulations, 2010 CFR
2010-01-01
... such enterprises in participating fully in research, development, demonstration and contract activities...-tier subcontractors of DOE operating contractors in furtherance of the research, development... extent funds are provided in advance in appropriation acts. This regulation implements the authority for...
Code of Federal Regulations, 2013 CFR
2013-10-01
... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...
Code of Federal Regulations, 2011 CFR
2011-10-01
... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...
Code of Federal Regulations, 2012 CFR
2012-10-01
... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...
Code of Federal Regulations, 2014 CFR
2014-10-01
... any laborer or mechanic employed by any contractor or subcontractor in the performance of work on the... receive compensation at a rate not less than one and one-half times his basic rate of pay for all hours...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
... you used. Provide specific examples to illustrate your concerns and suggest alternatives. Explain your... International subcontractors: Abt Associates, 55 Wheeler Street, Cambridge, MA 02138-1168; AMEC, 4021 Stirrup...
Nuclear Magnetic Resonance Trackbed Moisture Sensor System
DOT National Transportation Integrated Search
2018-02-01
In this initial phase, conducted from March 2015 through December 2016, Vista Clara and its subcontractor Zetica Rail successfully developed and tested a man-portable, non-invasive spot-check nuclear magnetic resonance (NMR) moisture sensor that dire...
RANT Building Upgrade Pre-Proposal Meeting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, Melinda Ann; Meadows, Darren W.; Rodriguez, Roger R.
This presentation is designed to provide an overview of the project scope and RFP; discuss interfaces for the construction project; highlight key expectations and deliverables from the subcontractor; and address questions and provide clarification of the project scope.
Outsourcing and scheduling for a two-machine flow shop with release times
NASA Astrophysics Data System (ADS)
Ahmadizar, Fardin; Amiri, Zeinab
2018-03-01
This article addresses a two-machine flow shop scheduling problem where jobs are released intermittently and outsourcing is allowed. The first operations of outsourced jobs are processed by the first subcontractor, they are transported in batches to the second subcontractor for processing their second operations, and finally they are transported back to the manufacturer. The objective is to select a subset of jobs to be outsourced, to schedule both the in-house and the outsourced jobs, and to determine a transportation plan for the outsourced jobs so as to minimize the sum of the makespan and the outsourcing and transportation costs. Two mathematical models of the problem and several necessary optimality conditions are presented. A solution approach is then proposed by incorporating the dominance properties with an ant colony algorithm. Finally, computational experiments are conducted to evaluate the performance of the models and solution approach.
NASA Technical Reports Server (NTRS)
Tew, Roy; Ibrahim, Mounir; Simon, Terry; Mantell, Susan; Gedeon, David; Qiu, Songgang; Wood, Gary
2004-01-01
This paper win report on continuation through the third year of a NASA grant for multi-dimensional Stirling CFD code development and validation; continuation through the third and final year of a Department of Energy, Golden Field Office (DOE), regenerator research effort and a NASA grant for continuation of the effort through two additional years; and a new NASA Research Award for design, microfabrication and testing of a "Next Generation Stirling Engine Regenerator." Cleveland State University (CSU) is the lead organization for all three efforts, with the University of Minnesota (UMN) and Gedeon Associates as subcontractors. The Stirling Technology Company and Sun power, Inc. acted as unfunded consultants or participants through the third years of both the NASA multi-D code development and DOE regenerator research efforts; they win both be subcontractors on the new regenerator microfabrication contract.
Automated solar cell assembly team process research
NASA Astrophysics Data System (ADS)
Nowlan, M. J.; Hogan, S. J.; Darkazalli, G.; Breen, W. F.; Murach, J. M.; Sutherland, S. F.; Patterson, J. S.
1994-06-01
This report describes work done under the Photovoltaic Manufacturing Technology (PVMaT) project, Phase 3A, which addresses problems that are generic to the photovoltaic (PV) industry. Spire's objective during Phase 3A was to use its light soldering technology and experience to design and fabricate solar cell tabbing and interconnecting equipment to develop new, high-yield, high-throughput, fully automated processes for tabbing and interconnecting thin cells. Areas that were addressed include processing rates, process control, yield, throughput, material utilization efficiency, and increased use of automation. Spire teamed with Solec International, a PV module manufacturer, and the University of Massachusetts at Lowell's Center for Productivity Enhancement (CPE), automation specialists, who are lower-tier subcontractors. A number of other PV manufacturers, including Siemens Solar, Mobil Solar, Solar Web, and Texas instruments, agreed to evaluate the processes developed under this program.
49 CFR 26.11 - What records do recipients keep and report?
Code of Federal Regulations, 2012 CFR
2012-10-01
... as accurate data as possible about the universe of DBE and non-DBE contractors and subcontractors who... conduct a survey that will result in statistically sound estimate of the universe of DBE and non-DBE...
49 CFR 26.11 - What records do recipients keep and report?
Code of Federal Regulations, 2011 CFR
2011-10-01
... as accurate data as possible about the universe of DBE and non-DBE contractors and subcontractors who... conduct a survey that will result in statistically sound estimate of the universe of DBE and non-DBE...
49 CFR 26.11 - What records do recipients keep and report?
Code of Federal Regulations, 2014 CFR
2014-10-01
... as accurate data as possible about the universe of DBE and non-DBE contractors and subcontractors who... conduct a survey that will result in statistically sound estimate of the universe of DBE and non-DBE...
49 CFR 26.11 - What records do recipients keep and report?
Code of Federal Regulations, 2013 CFR
2013-10-01
... as accurate data as possible about the universe of DBE and non-DBE contractors and subcontractors who... conduct a survey that will result in statistically sound estimate of the universe of DBE and non-DBE...
7 CFR 4279.281 - Conditions precedent to issuance of loan note guarantee.
Code of Federal Regulations, 2012 CFR
2012-01-01
... facility and to provide the required security. For example, when a site is for major structures for utility... certify to the lender that all laborers and mechanics employed by contractors or subcontractors in the...
7 CFR 4279.281 - Conditions precedent to issuance of loan note guarantee.
Code of Federal Regulations, 2014 CFR
2014-01-01
... facility and to provide the required security. For example, when a site is for major structures for utility... certify to the lender that all laborers and mechanics employed by contractors or subcontractors in the...
7 CFR 4279.281 - Conditions precedent to issuance of loan note guarantee.
Code of Federal Regulations, 2013 CFR
2013-01-01
... facility and to provide the required security. For example, when a site is for major structures for utility... certify to the lender that all laborers and mechanics employed by contractors or subcontractors in the...
Our Acquisitions Directorate supports the national laboratory with high quality products and services to achieve its national mission. In addition to engaging large subcontractors, we are also committed to working with small businesses, minority- and
48 CFR 3.502-2 - Subcontractor kickbacks.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... 8703(b)). [52 FR 6121, Feb. 27, 1987; 52 FR 9989, Mar. 27, 1987, as amended at 53 FR 34226, Sept. 2... contract price charged by a prime contractor to the United States. (b) Imposes criminal penalties on any...
Procurement Procurement The National Renewable Energy Laboratory (NREL) offers numerous procurement source of biofuels. Register Your Small Business NREL welcomes small, disadvantaged, HUBzone, veteran -owned, and women-owned business vendors and subcontractors. Register today
Code of Federal Regulations, 2010 CFR
2010-10-01
... officer a complete statement of the reasons for the disagreement with the findings. (d) The contracting...-Bacon Act that constitute a disregard of its obligations to employees or subcontractors under section 3...
42 CFR 480.101 - Scope and definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ORGANIZATION REVIEW INFORMATION Utilization and Quality Control Quality Improvement Organizations (QIOs... Quality Control Quality Improvement Organization (QIO) (or the review component of a QIO subcontractor) in... sought under Title XVIII of the Act. Aggregate statistical data means any utilization, admission...
Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study
NASA Astrophysics Data System (ADS)
Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan
2010-05-01
Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.
48 CFR 908.7106 - Security cabinets.
Code of Federal Regulations, 2010 CFR
2010-10-01
....7106 Section 908.7106 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7106 Security...) Fixed-price prime contractors and lower tier subcontractors may use GSA acquisition sources for security...
78 FR 17176 - Federal Acquisition Regulation; Defense Base Act
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Regulation; Defense Base Act AGENCIES: Department of Defense (DoD), General Services Administration (GSA... subcontractor responsibilities to obtain workers' compensation insurance or to qualify as a self-insurer, and...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
48 CFR 47.505 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 47... MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 47.505 Construction contracts. (a) Except as stated in paragraph (b) below, construction contractors, including subcontractors and suppliers...
48 CFR 19.1202-4 - Procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (a) The solicitation shall describe the SDB participation evaluation factor or subfactor. The... total target for SDB participation by the contractor, including joint venture partners, and team members, and a total target for SDB participation by subcontractors. The solicitation shall require an SDB...
You Can Make Your Facilities Services Provider Part of the College Community.
ERIC Educational Resources Information Center
Ledbetter, Randy
2002-01-01
Discusses five attributes that, when well implemented, form the framework for successful relationships between college administration and services companies: reporting relationships, Quality of Service (QoS) measures, formal reports and reviews, employee relations, and subcontractor relations. (EV)
48 CFR 19.1202-4 - Procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (a) The solicitation shall describe the SDB participation evaluation factor or subfactor. The... total target for SDB participation by the contractor, including joint venture partners, and team members, and a total target for SDB participation by subcontractors. The solicitation shall require an SDB...
48 CFR 19.1202-4 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (a) The solicitation shall describe the SDB participation evaluation factor or subfactor. The... total target for SDB participation by the contractor, including joint venture partners, and team members, and a total target for SDB participation by subcontractors. The solicitation shall require an SDB...
48 CFR 19.1202-4 - Procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (a) The solicitation shall describe the SDB participation evaluation factor or subfactor. The... total target for SDB participation by the contractor, including joint venture partners, and team members, and a total target for SDB participation by subcontractors. The solicitation shall require an SDB...
48 CFR 19.1202-4 - Procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (a) The solicitation shall describe the SDB participation evaluation factor or subfactor. The... total target for SDB participation by the contractor, including joint venture partners, and team members, and a total target for SDB participation by subcontractors. The solicitation shall require an SDB...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 3.908-3 Section 3.908-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL IMPROPER BUSINESS... Policy. (a) Contractors and subcontractors are prohibited from discharging, demoting, or otherwise...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... show photographic identification, pass through a metal detector, and sign the EPA visitor log. All visitor bags are processed through an X-ray machine and subject to search. Visitors will be provided an...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-14
... (202) 566-0280. Docket visitors are required to show photographic identification, pass through a metal detector, and sign the EPA visitor log. All visitor bags are processed through an X-ray machine and subject...
25 CFR 273.36 - Eligible subcontractors.
Code of Federal Regulations, 2013 CFR
2013-04-01
... BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE... to other than tribal organizations, States, school districts and Indian corporations. However, tribal organizations, States, school districts, and Indian corporations receiving funds under this part may use the...
25 CFR 273.36 - Eligible subcontractors.
Code of Federal Regulations, 2014 CFR
2014-04-01
... BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE... to other than tribal organizations, States, school districts and Indian corporations. However, tribal organizations, States, school districts, and Indian corporations receiving funds under this part may use the...
DEMONSTRATION OF NO-VOC/NO-HAP WOOD FURNITURE COATING SYSTEM
The United States Environmental Protection Agency has contracted with AeroVironment Environmental Services, Inc. and its subcontractor, Adhesives Coating Co., to develop and demonstrate a no-VOC (volatile organic compound)/no-HAP (hazardous air pollutant) wood furniture coating s...
Environment/Health/Safety (EHS): Databases
Hazard Documents Database Biosafety Authorization System CATS (Corrective Action Tracking System) (for findings 12/2005 to present) Chemical Management System Electrical Safety Ergonomics Database (for new Learned / Best Practices REMS - Radiation Exposure Monitoring System SJHA Database - Subcontractor Job
48 CFR 1809.505-4 - Obtaining access to sensitive information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Organizational and Consultant Conflicts of Interest 1809.505-4 Obtaining access to sensitive information. (b) In... support management activities and administrative functions. The Assistant Administrator for Procurement... require contractors and subcontractors and their employees in procurements that support management...
23 CFR 230.413 - Review reports.
Code of Federal Regulations, 2010 CFR
2010-04-01
... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... documentary evidence. (4) The compliance review report shall contain at least the following information. 1... from the General Accounting Office, Office of Management and Budget, Senate Subcommittee on Public...
Smart Grid Cybersecurity: Job Performance Model Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Neil, Lori Ross; Assante, Michael; Tobey, David
2012-08-01
This is the project report to DOE OE-30 for the completion of Phase 1 of a 3 phase report. This report outlines the work done to develop a smart grid cybersecurity certification. This work is being done with the subcontractor NBISE.
48 CFR 9901.307 - Exemptions and waivers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Exemptions and waivers. 9901.307 Section 9901.307 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD... subcontractors from cost accounting standards requirements, and establish procedures for waiver of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis
2004-04-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE--A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2004 through March 2004. The DOE and TerraTek continue to wait for Novatek on the optimization portion of the testing program (they are completely rebuilding their fluid hammer). The latest indication is that the Novatek tool would be ready for retesting only 3Q 2004. Smith International's hammer will be tested in April of 2004 (2Q 2004 report). Accomplishments included the following: (1) TerraTek presented a paper for publication inmore » conjunction with a peer review at the GTI Natural Gas Technologies Conference February 10, 2004. Manuscripts and associated presentation material were delivered on schedule. The paper was entitled ''Mud Hammer Performance Optimization''. (2) Shell Exploration and Production continued to express high interest in the ''cutter impact'' testing program Task 8. Hughes Christensen supplied inserts for this testing program. (3) TerraTek hosted an Industry/DOE planning meeting to finalize a testing program for ''Cutter Impact Testing--Understanding Rock Breakage with Bits'' on February 13, 2004. (4) Formal dialogue with Terralog was initiated. Terralog has recently been awarded a DOE contract to model hammer mechanics with TerraTek as a sub-contractor. (5) Novatek provided the DOE with a schedule to complete their new fluid hammer and test it at TerraTek.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... variety of ways, including, in response to an invitation to applicants to self-identify in accordance with 41 CFR 60-300.42, voluntary self-disclosures by covered incumbent veterans, or actual knowledge of an...
43 CFR 27.8 - Compliance procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... origin or sex is excluded from receiving or participating in any activity conducted under any permit... circumstances under which the possible noncompliance occurred and other factors relevant to a determination as... subcontractor shall be notified that making such commitments does not preclude future determinations of...
43 CFR 27.8 - Compliance procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... origin or sex is excluded from receiving or participating in any activity conducted under any permit... circumstances under which the possible noncompliance occurred and other factors relevant to a determination as... subcontractor shall be notified that making such commitments does not preclude future determinations of...
43 CFR 27.8 - Compliance procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... origin or sex is excluded from receiving or participating in any activity conducted under any permit... circumstances under which the possible noncompliance occurred and other factors relevant to a determination as... subcontractor shall be notified that making such commitments does not preclude future determinations of...
43 CFR 27.8 - Compliance procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... origin or sex is excluded from receiving or participating in any activity conducted under any permit... circumstances under which the possible noncompliance occurred and other factors relevant to a determination as... subcontractor shall be notified that making such commitments does not preclude future determinations of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...
Code of Federal Regulations, 2012 CFR
2012-07-01
... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...
Code of Federal Regulations, 2010 CFR
2010-07-01
... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...
Code of Federal Regulations, 2011 CFR
2011-07-01
... OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA... accommodation is any change in the work environment or in the way things are customarily done that enables a...
48 CFR 926.7103 - Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... preference in hiring to an eligible employee of Department of Energy Defense Nuclear Facilities. This right... and subcontractors employed at Department of Energy Defense Nuclear Facilities, to the extent... implementation of Section 3161 at the Department of Energy Defense Nuclear Facility and local counsel, should...
48 CFR 926.7103 - Requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... preference in hiring to an eligible employee of Department of Energy Defense Nuclear Facilities. This right... and subcontractors employed at Department of Energy Defense Nuclear Facilities, to the extent... implementation of Section 3161 at the Department of Energy Defense Nuclear Facility and local counsel, should...
48 CFR 926.7103 - Requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... preference in hiring to an eligible employee of Department of Energy Defense Nuclear Facilities. This right... and subcontractors employed at Department of Energy Defense Nuclear Facilities, to the extent... implementation of Section 3161 at the Department of Energy Defense Nuclear Facility and local counsel, should...
48 CFR 926.7103 - Requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... preference in hiring to an eligible employee of Department of Energy Defense Nuclear Facilities. This right... and subcontractors employed at Department of Energy Defense Nuclear Facilities, to the extent... implementation of Section 3161 at the Department of Energy Defense Nuclear Facility and local counsel, should...
48 CFR 926.7103 - Requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... preference in hiring to an eligible employee of Department of Energy Defense Nuclear Facilities. This right... and subcontractors employed at Department of Energy Defense Nuclear Facilities, to the extent... implementation of Section 3161 at the Department of Energy Defense Nuclear Facility and local counsel, should...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true [Reserved] 60-1.6 Section 60-1.6 Public Contracts and Property Management Other Provisions Relating to Public Contracts OFFICE...-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Preliminary Matters; Equal Opportunity Clause; Compliance...
41 CFR 60-1.2 - Administrative responsibility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Administrative responsibility. 60-1.2 Section 60-1.2 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Preliminary Matters; Equal Opportunity...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true [Reserved] 60-1.6 Section 60-1.6 Public Contracts and Property Management Other Provisions Relating to Public Contracts OFFICE...-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Preliminary Matters; Equal Opportunity Clause; Compliance...
41 CFR 60-1.2 - Administrative responsibility.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Administrative responsibility. 60-1.2 Section 60-1.2 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Preliminary Matters; Equal Opportunity...
41 CFR 60-1.8 - Segregated facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Segregated facilities. 60-1.8 Section 60-1.8 Public Contracts and Property Management Other Provisions Relating to Public... 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Preliminary Matters; Equal Opportunity Clause...
41 CFR 60-1.8 - Segregated facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Segregated facilities. 60-1.8 Section 60-1.8 Public Contracts and Property Management Other Provisions Relating to Public... 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Preliminary Matters; Equal Opportunity Clause...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Exemptions. 60-1.5 Section 60-1.5 Public Contracts and Property Management Other Provisions Relating to Public Contracts...-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Preliminary Matters; Equal Opportunity Clause; Compliance...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 1803.903 Section 1803.903 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL... Protections 1803.903 Policy. (a) Policy. 10 U.S.C. 2409 prohibits contractors or subcontractors from...
41 CFR 60-741.61 - Complaint procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Complaint procedures. 60-741.61 Section 60-741.61 Public Contracts and Property Management Other Provisions Relating to Public... 741-AFFIRMATIVE ACTION AND NONDISCRIMINATION OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS REGARDING...
48 CFR 227.7203-11 - Contractor procedures and records.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...
48 CFR 227.7203-11 - Contractor procedures and records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...
48 CFR 227.7203-11 - Contractor procedures and records.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...
48 CFR 227.7203-11 - Contractor procedures and records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...
48 CFR 227.7203-11 - Contractor procedures and records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Rights in Computer Software and Computer Software Documentation 227.7203-11 Contractor procedures and records. (a) The clause at 252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation, requires a contractor, and its subcontractors or suppliers that will...
40 CFR 2.215 - Confidentiality agreements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Confidentiality agreements. 2.215... Confidentiality of Business Information § 2.215 Confidentiality agreements. (a) No EPA officer, employee, contractor, or subcontractor shall enter into any agreement with any affected business to keep business...
40 CFR 2.215 - Confidentiality agreements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Confidentiality agreements. 2.215... Confidentiality of Business Information § 2.215 Confidentiality agreements. (a) No EPA officer, employee, contractor, or subcontractor shall enter into any agreement with any affected business to keep business...
48 CFR 1852.223-71 - Frequency authorization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Frequency authorization... obtained by the Contractor or subcontractor in need thereof. (b) For any experimental, developmental, or... device to the Contracting Officer during the initial planning, experimental, or developmental phase of...
78 FR 72679 - Submission for OMB Review: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... OMB Review: Comment Request Title: RPG National Cross-Site Evaluation and Evaluation Technical..., activities, and services designed to increase well-being, improve permanency, and enhance the safety of... Research. The evaluation is being implemented by Mathematica Policy Research and its subcontractors, Walter...
48 CFR 1352.215-75 - Evaluation criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
... relative importance among the technical evaluation factors.] Based upon the results of the integrated... as the offeror's planned management of consultants and subcontractors, if applicable. Factor 2... likelihood that that offeror can successfully perform the contract requirements and the degree of the risk of...