A Method for Calculating the Probability of Successfully Completing a Rocket Propulsion Ground Test
NASA Technical Reports Server (NTRS)
Messer, Bradley
2007-01-01
Propulsion ground test facilities face the daily challenge of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Over the last decade NASA s propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and exceeded the capabilities of numerous test facility and test article components. A logistic regression mathematical modeling technique has been developed to predict the probability of successfully completing a rocket propulsion test. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),.., X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure of accomplishing a full duration test. The use of logistic regression modeling is not new; however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from this type of model provide project managers with insight and confidence into the effectiveness of rocket propulsion ground testing.
NASA Technical Reports Server (NTRS)
Kostell, G. D.; Schubert, F. H.; Shumar, J. W.; Hallick, T. M.; Jensen, F. C.
1974-01-01
A six man, self contained, electrochemical carbon dioxide concentrating subsystem for space station prototype use was successfully designed, fabricated, and tested. A test program was successfully completed which covered shakedown testing, design verification testing, and acceptance testing.
NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success
NASA Technical Reports Server (NTRS)
Hutt, John J.; Whitehead, Josh; Hanson, John
2017-01-01
NASA is working toward the first launch of a new, unmatched capability for deep space exploration, with launch readiness planned for 2018. The initial Block 1 configuration of the Space Launch System will more than double the mass and volume to Low Earth Orbit (LEO) of any launch vehicle currently in operation - with a path to evolve to the greatest capability ever developed. The program formally began in 2011. The vehicle successfully passed Preliminary Design Review (PDR) in 2013, Key Decision Point C (KDPC) in 2014 and Critical Design Review (CDR) in October 2015 - nearly 40 years since the last CDR of a NASA human-rated rocket. Every major SLS element has completed components of test and flight hardware. Flight software has completed several development cycles. RS-25 hotfire testing at NASA Stennis Space Center (SSC) has successfully demonstrated the space shuttle-heritage engine can perform to SLS requirements and environments. The five-segment solid rocket booster design has successfully completed two full-size motor firing tests in Utah. Stage and component test facilities at Stennis and NASA Marshall Space Flight Center are nearing completion. Launch and test facilities, as well as transportation and other ground support equipment are largely complete at NASA's Kennedy, Stennis and Marshall field centers. Work is also underway on the more powerful Block 1 B variant with successful completion of the Exploration Upper Stage (EUS) PDR in January 2017. NASA's approach is to develop this heavy lift launch vehicle with limited resources by building on existing subsystem designs and existing hardware where available. The systems engineering and integration (SE&I) of existing and new designs introduces unique challenges and opportunities. The SLS approach was designed with three objectives in mind: 1) Design the vehicle around the capability of existing systems; 2) Reduce work hours for nonhardware/ software activities; 3) Increase the probability of mission success by focusing effort on more critical activities.
The South African Tuberculosis Care Cascade: Estimated Losses and Methodological Challenges
Naidoo, Pren; Theron, Grant; Rangaka, Molebogeng X; Chihota, Violet N; Vaughan, Louise; Brey, Zameer O; Pillay, Yogan
2017-01-01
Abstract Background While tuberculosis incidence and mortality are declining in South Africa, meeting the goals of the End TB Strategy requires an invigorated programmatic response informed by accurate data. Enumerating the losses at each step in the care cascade enables appropriate targeting of interventions and resources. Methods We estimated the tuberculosis burden; the number and proportion of individuals with tuberculosis who accessed tests, had tuberculosis diagnosed, initiated treatment, and successfully completed treatment for all tuberculosis cases, for those with drug-susceptible tuberculosis (including human immunodeficiency virus (HIV)–coinfected cases) and rifampicin-resistant tuberculosis. Estimates were derived from national electronic tuberculosis register data, laboratory data, and published studies. Results The overall tuberculosis burden was estimated to be 532005 cases (range, 333760–764480 cases), with successful completion of treatment in 53% of cases. Losses occurred at multiple steps: 5% at test access, 13% at diagnosis, 12% at treatment initiation, and 17% at successful treatment completion. Overall losses were similar among all drug-susceptible cases and those with HIV coinfection (54% and 52%, respectively, successfully completed treatment). Losses were substantially higher among rifampicin- resistant cases, with only 22% successfully completing treatment. Conclusion Although the vast majority of individuals with tuberculosis engaged the public health system, just over half were successfully treated. Urgent efforts are required to improve implementation of existing policies and protocols to close gaps in tuberculosis diagnosis, treatment initiation, and successful treatment completion. PMID:29117342
Martin, Chris A; Dieringer, Breana M; McNeil, Daniel W
2017-01-01
Orthodontics has inherent demands, requiring regular appointments and active patient engagement, but relatively little is established in regard to rates of completion of treatment and possible factors affecting successful completion. These factors may be particularly important for cultural minority groups, such as those in rural Appalachia, given the environmental, social, and economic complexities affecting access to and utilization of treatment. A naturalistic study design was employed, using retrospective data from a rural outpatient general dental office in July 2012. Chart abstraction yielded 219 (55.3% female) orthodontic patients (M age = 11.0 [3.7]). Chi-square tests for independence were conducted for categorical dependent variables. For continuous variables, t -tests were conducted. A logistic multivariate regression analysis was conducted to predict completion/non-completion of treatment, with age, gender, distance traveled, type of malocclusion, and payment type as predictors. Overall, 49.8% of this sample successfully completed orthodontic treatment. Greater successful conclusion of treatment was found in self-pay patients (i.e., 74%) versus those whose care was funded through Medicaid/Children's Health Insurance Program (i.e., 34%) or through private insurance (i.e., 36%). Age, gender, and distance to the office from home had no association relative to successful completion of treatment, although average one-way distance to travel for care was considerable (i.e., 38.8 miles). Rate of successful orthodontic treatment completion was low in this rural sample. Treatment outcome was related to the form of payment for services, with self-pay associated with the highest rate of successful completion.
The South African Tuberculosis Care Cascade: Estimated Losses and Methodological Challenges.
Naidoo, Pren; Theron, Grant; Rangaka, Molebogeng X; Chihota, Violet N; Vaughan, Louise; Brey, Zameer O; Pillay, Yogan
2017-11-06
While tuberculosis incidence and mortality are declining in South Africa, meeting the goals of the End TB Strategy requires an invigorated programmatic response informed by accurate data. Enumerating the losses at each step in the care cascade enables appropriate targeting of interventions and resources. We estimated the tuberculosis burden; the number and proportion of individuals with tuberculosis who accessed tests, had tuberculosis diagnosed, initiated treatment, and successfully completed treatment for all tuberculosis cases, for those with drug-susceptible tuberculosis (including human immunodeficiency virus (HIV)-coinfected cases) and rifampicin-resistant tuberculosis. Estimates were derived from national electronic tuberculosis register data, laboratory data, and published studies. The overall tuberculosis burden was estimated to be 532005 cases (range, 333760-764480 cases), with successful completion of treatment in 53% of cases. Losses occurred at multiple steps: 5% at test access, 13% at diagnosis, 12% at treatment initiation, and 17% at successful treatment completion. Overall losses were similar among all drug-susceptible cases and those with HIV coinfection (54% and 52%, respectively, successfully completed treatment). Losses were substantially higher among rifampicin- resistant cases, with only 22% successfully completing treatment. Although the vast majority of individuals with tuberculosis engaged the public health system, just over half were successfully treated. Urgent efforts are required to improve implementation of existing policies and protocols to close gaps in tuberculosis diagnosis, treatment initiation, and successful treatment completion. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.
2 kWe Solar Dynamic Ground Test Demonstration Project. Volume 3; Fabrication and Test Report
NASA Technical Reports Server (NTRS)
Alexander, Dennis
1997-01-01
The Solar Dynamic Ground Test Demonstration (SDGTD) project has successfully designed and fabricated a complete solar-powered closed Brayton electrical power generation system and tested it in a relevant thermal vacuum facility at NASA Lewis Research Center (LeRC). In addition to completing technical objectives, the project was completed 3-l/2 months early, and under budget.
ERIC Educational Resources Information Center
Schwartz, Sarah M.; Evans, Cathy; Agur, Anne M.R.
2015-01-01
Students in health care professional programs face many stressful tests that determine successful completion of their program. Test anxiety during these high stakes examinations can affect working memory and lead to poor outcomes. Methods of decreasing test anxiety include lengthening the time available to complete examinations or evaluating…
40 CFR 75.4 - Compliance dates.
Code of Federal Regulations, 2014 CFR
2014-07-01
... relative accuracy test audit (RATA) of the high measurement scale of the monitor is successfully completed... tests required under § 75.20(c) and section 6 of appendix A to this part for the high measurement scale... that all certification tests are completed no later than the following dates (except as provided in...
40 CFR 75.4 - Compliance dates.
Code of Federal Regulations, 2012 CFR
2012-07-01
... relative accuracy test audit (RATA) of the high measurement scale of the monitor is successfully completed... tests required under § 75.20(c) and section 6 of appendix A to this part for the high measurement scale... that all certification tests are completed no later than the following dates (except as provided in...
40 CFR 75.4 - Compliance dates.
Code of Federal Regulations, 2013 CFR
2013-07-01
... relative accuracy test audit (RATA) of the high measurement scale of the monitor is successfully completed... tests required under § 75.20(c) and section 6 of appendix A to this part for the high measurement scale... that all certification tests are completed no later than the following dates (except as provided in...
A Correlation of Community College Math Readiness and Student Success
NASA Astrophysics Data System (ADS)
Brown, Jayna Nicole
Although traditional college students are more prepared for college-level math based on college admissions tests, little data have been collected on nontraditional adult learners. The purpose of this study was to investigate relationships between math placement tests and community college students' success in math courses and persistence to degree or certificate completion. Guided by Tinto's theory of departure and student retention, the research questions addressed relationships and predictability of math Computer-adaptive Placement Assessment and Support System (COMPASS) test scores and students' performance in math courses, persistence in college, and degree completion. After conducting correlation and regression analyses, no significant relationships were identified between COMPASS Math test scores and students' performance (n = 234) in math courses, persistence in college, or degree completion. However, independent t test and chi-squared analyses of the achievements of college students who tested into Basic Math (n = 138) vs. Introduction to Algebra (n = 96) yielded statistically significant differences in persistence (p = .039), degree completion (p < .001), performance (p = .008), and progress ( p = .001), indicating students who tested into Introduction to Algebra were more successful and persisted more often to degree completion. In order to improve instructional methods for Basic Math courses, a 3-day professional development workshop was developed for math faculty focusing on current, best practices in remedial math instruction. Implications for social change include providing math faculty with the knowledge and skills to develop new instructional methods for remedial math courses. A change in instructional methods may improve community college students' math competencies and degree achievement.
ERIC Educational Resources Information Center
Carpenter, Dick M., II; Kaka, Sarah J.; Tygret, Jennifer A.; Cathcart, Katy
2018-01-01
This study examines the efficacy of a scholarship program designed to assist single parent, post-freshmen, full time undergraduate students and predictors of success among a sample of said students, where success is defined as progress toward completion, academic achievement, and degree completion. Results of fixed effects regression and…
Dual Axis Radiographic Hydrodynamic Test Facility
4:17 How DARHT Works The weapons programs at Los Alamos have one principal mission: ensure the safety, security, and effectiveness of nuclear weapons in our nation's enduring stockpile. One critical completed a successful two-axis, multiframe hydrotest. Two additional successful tests-one of which was
Advanced manufacturing development of a composite empennage component for L-1011 aircraft
NASA Technical Reports Server (NTRS)
1979-01-01
Work on process verification and tooling development continued. The cover process development was completed with the decision to proceed with low resin content prepreg material (34 + or - 3% by weight) in the fabrication of production readiness verification test (PRVT) specimens and the full-scale covers. The structural integrity of the cover/joint design was verified with the successful test of the cover attachment to fuselage ancillary test specimen (H25). Failure occurred, as predicted, in the skin panel away from the fuselage joint at 141 percent of the design ultimate load. With the successful completion of the H25 test, the PRVT cover specimens, which are identical to the H25 ancillary test specimen, were cleared for production. Eight of the twenty cover specimens were fabricated and are in preparation for test. All twenty of the PRVT spar specimens were fabricated and also were prepared for test. The environmental chambers used in the durability test of ten cover and ten spar PRVT specimens were completed and installed in the load reaction frames.
Successful completion of a cyclic ground test of a mercury ion auxiliary propulsion system
NASA Technical Reports Server (NTRS)
Francisco, David R.; Low, Charles A., Jr.; Power, John L.
1988-01-01
An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.
Successful completion of a cyclic ground test of a mercury Ion Auxiliary Propulsion System
NASA Technical Reports Server (NTRS)
Francisco, David R.; Low, Charles A., Jr.; Power, John L.
1988-01-01
An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.
Dichotomous scoring of Trails B in patients referred for a dementia evaluation.
Schmitt, Andrew L; Livingston, Ronald B; Smernoff, Eric N; Waits, Bethany L; Harris, James B; Davis, Kent M
2010-04-01
The Trail Making Test is a popular neuropsychological test and its interpretation has traditionally used time-based scores. This study examined an alternative approach to scoring that is simply based on the examinees' ability to complete the test. If an examinee is able to complete Trails B successfully, they are coded as "completers"; if not, they are coded as "noncompleters." To assess this approach to scoring Trails B, the performance of 97 diagnostically heterogeneous individuals referred for a dementia evaluation was examined. In this sample, 55 individuals successfully completed Trails B and 42 individuals were unable to complete it. Point-biserial correlations indicated a moderate-to-strong association (r(pb)=.73) between the Trails B completion variable and the Total Scale score of the Repeatable Battery for the Assessment of Neurological Status (RBANS), which was larger than the correlation between the Trails B time-based score and the RBANS Total Scale score (r(pb)=.60). As a screen for dementia status, Trails B completion showed a sensitivity of 69% and a specificity of 100% in this sample. These results suggest that dichotomous scoring of Trails B might provide a brief and clinically useful measure of dementia status.
NASA Technical Reports Server (NTRS)
Heffer, R.
1998-01-01
The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.
A Method for Calculating the Probability of Successfully Completing a Rocket Propulsion Ground Test
NASA Technical Reports Server (NTRS)
Messer, Bradley P.
2004-01-01
Propulsion ground test facilities face the daily challenges of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Due to budgetary and schedule constraints, NASA and industry customers are pushing to test more components, for less money, in a shorter period of time. As these new rocket engine component test programs are undertaken, the lack of technology maturity in the test articles, combined with pushing the test facilities capabilities to their limits, tends to lead to an increase in facility breakdowns and unsuccessful tests. Over the last five years Stennis Space Center's propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and broken numerous test facility and test article parts. While various initiatives have been implemented to provide better propulsion test techniques and improve the quality, reliability, and maintainability of goods and parts used in the propulsion test facilities, unexpected failures during testing still occur quite regularly due to the harsh environment in which the propulsion test facilities operate. Previous attempts at modeling the lifecycle of a propulsion component test project have met with little success. Each of the attempts suffered form incomplete or inconsistent data on which to base the models. By focusing on the actual test phase of the tests project rather than the formulation, design or construction phases of the test project, the quality and quantity of available data increases dramatically. A logistic regression model has been developed form the data collected over the last five years, allowing the probability of successfully completing a rocket propulsion component test to be calculated. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),..,X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure. Logistic regression has primarily been used in the fields of epidemiology and biomedical research, but lends itself to many other applications. As indicated the use of logistic regression is not new, however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from the models provide project managers with insight and confidence into the affectivity of rocket engine component ground test projects. The initial success in modeling rocket propulsion ground test projects clears the way for more complex models to be developed in this area.
NASA's Space Launch System Takes Shape
NASA Technical Reports Server (NTRS)
Askins, Bruce; Robinson, Kimberly F.
2017-01-01
Major hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of a major new capability for deep space human exploration. SLS continues to pursue a 2018 first launch of Exploration Mission 1 (EM-1). At NASA's Michoud Assembly Facility near New Orleans, LA, Boeing completed welding of structural test and flight liquid hydrogen tanks, and engine sections. Test stands for core stage structural tests at NASA's Marshall Space Flight Center, Huntsville, AL. neared completion. The B2 test stand at NASA's Stennis Space Center, MS, completed major structural renovation to support core stage green run testing in 2018. Orbital ATK successfully test fired its second qualification solid rocket motor in the Utah desert and began casting the motor segments for EM-1. Aerojet Rocketdyne completed its series of test firings to adapt the heritage RS-25 engine to SLS performance requirements. Production is under way on the first five new engine controllers. NASA also signed a contract with Aerojet Rocketdyne for propulsion of the RL10 engines for the Exploration Upper Stage. United Launch Alliance delivered the structural test article for the Interim Cryogenic Propulsion Stage to MSFC for tests and construction was under way on the flight stage. Flight software testing at MSFC, including power quality and command and data handling, was completed. Substantial progress is planned for 2017. Liquid oxygen tank production will be completed at Michoud. Structural testing at Marshall will get under way. RS-25 hotfire testing will verify the new engine controllers. Core stage horizontal integration will begin. The core stage pathfinder mockup will arrive at the B2 test stand for fit checks and tests. EUS will complete preliminary design review. This paper will discuss the technical and programmatic successes and challenges of 2016 and look ahead to plans for 2017.
NASA Astrophysics Data System (ADS)
Trout, Joseph; Bland, Jared
2013-03-01
In this pilot project, one hour of lecture time was replaced with one hour of in-class assignments, which groups of students collaborated on. These in-class assignments consisted of problems or projects selected for the calculus-based introductory physics students The first problem was at a level of difficulty that the majority of the students could complete with a small to moderate amount of difficulty. Each successive problem was increasingly more difficult, the last problem being having a level of difficulty that was beyond the capabilities of the majority of the students and required some instructor intervention. The students were free to choose their own groups. Students were encouraged to interact and help each other understand. The success of the in-class exercises were measured using pre-tests and post-tests. The pre-test and post-test were completed by each student independently. Statistics were also compiled on each student's attendance record and the amount of time spent reading and studying, as reported by the student. Statistics were also completed on the student responses when asked if they had sufficient time to complete the pre-test and post-test and if they would have completed the test with the correct answers if they had more time. The pre-tests and post-tests were not used in the computation of the grades of the students.
Quarter Scale RLV Multi-Lobe LH2 Tank Test Program
NASA Technical Reports Server (NTRS)
Blum, Celia; Puissegur, Dennis; Tidwell, Zeb; Webber, Carol
1998-01-01
Thirty cryogenic pressure cycles have been completed on the Lockheed Martin Michoud Space Systems quarter scale RLV composite multi-lobe liquid hydrogen propellant tank assembly, completing the initial phases of testing and demonstrating technologies key to the success of large scale composite cryogenic tankage for X33, RLV, and other future launch vehicles.
40 CFR 92.512 - Suspension and revocation of certificates of conformity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... § 92.511(d), effective from the time that auditing of that locomotive or locomotive engine is completed... after the engine family is deemed to be in noncompliance. (c) If the results of testing or auditing... successful completion of testing, or auditing if applicable, on the failed locomotive or locomotive engine...
NASA Technical Reports Server (NTRS)
Kiceniuk, T.
1985-01-01
An organic Rankine-cycle (ORC) power module was developed for use in a multimodule solar power plant to be built and operated in a small community. Many successful components and subsystems, including the reciever, power conversion subsystem, energy transport subsystem, and control subsystem, were tested. Tests were performed on a complete power module using a test bed concentrator in place of the proposed concentrator. All major single-module program functional objectives were met and the multimodule operation presented no apparent problems. The hermetically sealed, self-contained, ORC power conversion unit subsequently successfully completed a 300-hour endurance run with no evidence of wear or operating problems.
Larson, Bruce A; Schnippel, Kathryn; Ndibongo, Buyiswa; Xulu, Thembisile; Brennan, Alana; Long, Lawrence; Fox, Matthew P; Rosen, Sydney
2012-10-01
A mobile HIV counseling and testing (HCT) program around Johannesburg piloted the integration of point-of-care (POC) CD4 testing, using the Pima analyzer, to improve linkages to HIV care. We report results from this pilot program for patients testing positive (n = 508) from May to October 2010. We analyzed 3 primary outcomes: assignment to testing group (offered POC CD4 or not), successful follow-up (by telephone), and completed the referral visit for HIV care within 8 weeks after HIV testing if successfully followed up. Proportions for each outcome were calculated, and relative risks were estimated using a modified Poisson approach. Three hundred eleven patients were offered the POC CD4 test, and 197 patients were not offered the test. No differences in patient characteristics were observed between the 2 groups. Approximately 62.7% of patients were successfully followed up 8 weeks after HIV testing, with no differences observed between testing groups. Among those followed up, 54.4% reported completing their referral visit. Patients offered the POC CD4 test were more likely to complete the referral visit for further HIV care (relative risk 1.25, 95% confidence interval: 1.00 to 1.57). In this mobile HCT setting, patients offered POC CD4 testing as part of the HCT services were more likely to visit a referral clinic after testing, suggesting that rapid CD4 testing technology may improve linkage to HIV care. Future research can evaluate options for adjusting HCT services if POC CD4 testing was included permanently and the cost-effectiveness of the POC CD4 testing compared with other approaches for improving linkage of care.
Exploring and Testing the Predictors of New Faculty Success: A Mixed Methods Study
ERIC Educational Resources Information Center
Stupnisky, R. H.; Weaver-Hightower, M. B.; Kartoshkina, Y.
2015-01-01
The purpose of this mixed methods study was to investigate and test the factors contributing to new faculty members' success. In the first phase, qualitative analysis of focus groups revealed four prominent themes affecting new faculty members: expectations, collegiality, balance, and location. In the second phase, new faculty members completed an…
Measuring Successful Aging in Southern Black Older Adults
ERIC Educational Resources Information Center
Troutman, Meredith; Nies, Mary A.; Bentley, Monica
2011-01-01
With the growing size of the population of aging Black individuals, it is important to understand successful aging in this group. This study, therefore, piloted the Successful Aging Inventory (SAI) with a convenience sample of Black older adults. Participants completed a demographic form, the SAI, Purpose in Life Test, Life Satisfaction…
Does the generation effect occur for pictures?
Kinjo, H; Snodgrass, J G
2000-01-01
The generation effect is the finding that self-generated stimuli are recalled and recognized better than read stimuli. The effect has been demonstrated primarily with words. This article examines the effect for pictures in two experiments: Subjects named complete pictures (name condition) and fragmented pictures (generation condition). In Experiment 1, memory was tested in 3 explicit tasks: free recall, yes/no recognition, and a source-monitoring task on whether each picture was complete or fragmented (the complete/incomplete task). The generation effect was found for all 3 tasks. However, in the recognition and source-monitoring tasks, the generation effect was observed only in the generation condition. We hypothesized that absence of the effect in the name condition was due to the sensory or process match effect between study and test pictures and the superior identification of pictures in the name condition. Therefore, stimuli were changed from pictures to their names in Experiment 2. Memory was tested in the recognition task, complete/incomplete task, and second source-monitoring task (success/failure) on whether each picture had been identified successfully. The generation effect was observed for all 3 tasks. These results suggest that memory of structural and semantic characteristics and of success in identification of generated pictures may contribute to the generation effect.
Clemency, Brian; Martin-Gill, Christian; Rall, Nicole; May, Paul; Lubin, Jeffrey; Cooley, Craig; Van Dillen, Christine; Silvestri, Salvatore; Portela, Roberto; Cooney, Derek; Knutsen, Christian; March, Juan
2017-01-01
A board review question bank was created to assist candidates in their preparation for the 2015 EMS certification examination. We aimed to describe the development of this question bank and evaluate its successes in preparing candidates to obtain EMS subspecialty board certification. An online question bank was developed by 13 subject matter experts who participated as item writers, representing eight different EMS fellowship programs. The online question bank consisted of four practice tests, with each of the tests comprised of 100 questions. The number of candidates who participated in and completed the question bank was calculated. The passing rate among candidates who completed the question bank was calculated and compared to the publicly reported statistics for all candidates. The relationship between candidates' performance on the question bank and subspecialty exam pass rates was determined. A total of 252 candidates took at least one practice test and, of those, 225 candidates completed all four 100-question practice tests. The pass rate on the 2015 EMS certification exam was 79% (95%CI 74-85%) among candidates who completed the question bank, which is 12% higher than the overall pass rate (p = 0.003). Candidates' performance on the question bank was positively associated with overall success on the exam (X 2 = 75.8, p < 0.0001). Achieving a score of ≥ 70% on the question bank was associated with a higher likelihood of passing the exam (OR = 17.8; 95% CI: 8.0-39.6). Completing the question bank program was associated with improved pass rates on the EMS certification exam. Strong performance on the question bank correlated with success on the exam.
McLachlan, E; Anderson, S; Hawkes, D; Saville, M; Arabena, K
2018-02-01
To examine factors that enhance under-screened and never-screened women's completion of the self-collection alternative pathway of the Renewed National Cervical Screening Program (ncsp) in Victoria, Australia. With the Australian ncsp changing, starting on 1 December 2017, the Medical Services Advisory Committee (msac) recommended implementing human papillomavirus (hpv) testing using a self-collected sample for under-screened and never-screened populations. In response, a multi-agency group implemented an hpv self-collection pilot project to trial self-collection screening pathways for eligible women. Quantitative data were collected on participation rates and compliance rates with follow-up procedures across three primary health care settings. Forty women who self-collected were interviewed in a semi-structured format, and seven agency staff completed in-depth interviews. Qualitative data were used to identify and understand clinical and personal enablers that assisted women to complete self-collection cervical screening pathways successfully. Eighty-five per cent (10 women) of participants who tested positive for hpv successfully received their results and completed follow-up procedures as required. Two remaining participants also received hpv-positive results. However, agencies were unable to engage them in follow-up services and procedures. The overall participation rate in screening (self-collection or Pap test) was 85.7% (84 women), with 79 women self-collecting. Qualitative data indicated that clear explanations on self-collection, development of trusting, empathetic relationships with health professionals, and recognition of participants' past experiences were critical to the successful completion of the self-collection pathway. When asked about possible inhibitors to screening and to following up on results and appointments, women cited poor physical and mental health, as well as financial and other structural barriers. A well-implemented process, led by trusted, knowledgeable, and engaged health care professionals who can provide appropriate support and information, can assist under-screened and never-screened women to complete the hpv self-collection pathway successfully.
NASA Technical Reports Server (NTRS)
Sherriff, Abigail
2015-01-01
The Field Test study is currently in full swing, preceded by the successful completion of the Pilot Field Test study that paved the way for collecting data on the astronauts in the medical tent in Kazakhstan. Abigail Sherriff worked alongside Logan Dobbe on one Field Test aspect to determine foot clearance over obstacles (5cm, 10cm, and 15cm) using APDM Inc. Internal Measurement Units (IMU) worn by the astronauts. They created a program to accurately calculate foot clearance using the accelerometer, magnetometer, and gyroscope data with the IMUs attached to the top of the shoes. To validate the functionality of their program, they completed a successful study on test subjects performing various tasks in an optical motion studio, considered a gold standard in biomechanics research. Future work will include further validation and expanding the program to include other analyses.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1984-01-01
Major accomplishments during the second quarter of 1984 were completion of the Diaphragm Separation Seal clear liquid testing, and initiation of Phase III Field Testing. Diaphragm operational testing was conducted on a clear water test loop. The test goals were to ensure; mechanical reliability of the Diaphragm Seal, safe operation with simulated component failure, and proper operation of the Diaphragm Buffer Volume Control System. This latter system is essential in controlling the phasing of the diaphragm with its driving plunger. These tests were completed successfully. All operational problems were solved. However, it must be emphasized that the Diaphragm Seal wouldmore » be damaged by allowing the pump to operate in a cavitating condition for an extended period of time. A change in the Field Test phase of the program was made regarding choice of field test site. There is no operating Syn-Fuel pilot plant capable of inexpensively producing the slurry stream required for the reciprocating pump testing. The Field Tests will now be conducted by first testing the prototype pump and separation seals in an ambient temperature sand water slurry. This will determine resistence to abrasive wear and determine any operation problems at pressure over a lengthy period of time. After successful conclusion of these tests the pump and seals will be operated with a high temperature oil, but without solids, to identify any problems associated with thermal gradients, thermal shock and differential growth. After successful completion of the high temperature clean oil tests the pump will be deemed ready for in-line installation at a designated Syn-Fuel pilot plant. The above approach avoids the expense and complications of a separate hot slurry test loop. It also reduces risk of operational problems while in-line at the pilot plant. 5 figs.« less
Facility Activation and Characterization for IPD Turbopump Testing at NASA Stennis Space Center
NASA Technical Reports Server (NTRS)
Sass, J. P.; Pace, J. S.; Raines, N. G.; Meredith, T. O.; Taylor, S. A.; Ryan, H. M.
2005-01-01
The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is, in part, supported by NASA. IPD is also supported through the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today's state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The IPD Program recently achieved two major milestones. The first was the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The second major milestone was the successful completion of the IPD Fuel Turbopump (FTP) cold-flow test project at the NASA SSC E-1 test facility in November 2003. A total of six IPD FTP cold-flow tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in early 2005. Following and overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD oxidizer and fuel turbopumps. In addition, some of the facility challenges encountered and the lessons learned during the test projects shall be detailed.
Reusable Solid Rocket Motor Nozzle Joint 5 Redesign
NASA Technical Reports Server (NTRS)
Lui, R. C.; Stratton, T. C.; LaMont, D. T.
2003-01-01
Torque tension testing of a newly designed Reusable Solid Rocket Motor nozzle bolted assembly was successfully completed. Test results showed that the 3-sigma preload variation was as expected at the required input torque level and the preload relaxation were within the engineering limits. A shim installation technique was demonstrated as a simple process to fill a shear lip gap between nozzle housings in the joint region. A new automated torque system was successfully demonstrated in this test. This torque control tool was found to be very precise and accurate. The bolted assembly performance was further evaluated using the Nozzle Structural Test Bed. Both current socket head cap screw and proposed multiphase alloy bolt configurations were tested. Results indicated that joint skip and bolt bending were significantly reduced with the new multiphase alloy bolt design. This paper summarizes all the test results completed to date.
NASA Technical Reports Server (NTRS)
Dunham, Edward W.
2000-01-01
We developed the CCD camera system for the laboratory test demonstration and designed the optical system for this test. The camera system was delivered to Ames in April, 1999 with continuing support mostly in the software area as the test progressed. The camera system has been operating successfully since delivery. The optical system performed well during the test. The laboratory demonstration activity is now nearly complete and is considered to be successful by the Technical Advisory Group, which met on 8 February, 2000 at the SETI Institute. A final report for the Technical Advisory Group and NASA Headquarters will be produced in the next few months. This report will be a comprehensive report on all facets of the test including those covered under this grant. A copy will be forwarded, if desired, when it is complete.
Geraci, Lisa; Hughes, Matthew L; Miller, Tyler M; De Forrest, Ross L
2016-01-01
Negative aging stereotypes can lead older adults to perform poorly on memory tests. Yet, memory performance can be improved if older adults have a single successful experience on a cognitive test prior to participating in a memory experiment (Geraci & Miller, 2013, Psychology and Aging, 28, 340-345). The current study examined the effects of different types of prior task experience on subsequent memory performance. Before participating in a verbal free recall experiment, older adults in Experiment 1 successfully completed either a verbal or a visual cognitive task or no task. In Experiment 2, they successfully completed either a motor task or no task before participating in the free recall experiment. Results from Experiment 1 showed that relative to control (no prior task), participants who had prior success, either on a verbal or a visual task, had better subsequent recall performance. Experiment 2 showed that prior success on a motor task, however, did not lead to a later memory advantage relative to control. These findings demonstrate that older adults' memory can be improved by a successful prior task experience so long as that experience is in a cognitive domain.
Social Factors That Predict Fear of Academic Success
ERIC Educational Resources Information Center
Gore, Jonathan S.; Thomas, Jessica; Jones, Stevy; Mahoney, Lauren; Dukes, Kristina; Treadway, Jodi
2016-01-01
Fear of academic success is ultimately a fear of social exclusion. Therefore, various forms of social inclusion may alleviate this fear. Three studies tested the hypothesis that social inclusion variables negatively predict fear of success. In Study 1, middle and high school students (n = 129) completed surveys of parental involvement, parental…
Success in Primary School. Success in Schools
ERIC Educational Resources Information Center
Academy for Educational Development, 2010
2010-01-01
A quality education system is not measured solely by national test scores, but by whether all students are successful in primary school. This simply stated goal is surprisingly difficult to achieve where substantial numbers of children are at risk of failing to complete a primary education. This paper explores the challenges and the diverse…
Physics of Colloids in Space--Plus (PCS+) Experiment Completed Flight Acceptance Testing
NASA Technical Reports Server (NTRS)
Doherty, Michael P.
2004-01-01
The Physics of Colloids in Space--Plus (PCS+) experiment successfully completed system-level flight acceptance testing in the fall of 2003. This testing included electromagnetic interference (EMI) testing, vibration testing, and thermal testing. PCS+, an Expedite the Process of Experiments to Space Station (EXPRESS) Rack payload will deploy a second set of colloid samples within the PCS flight hardware system that flew on the International Space Station (ISS) from April 2001 to June 2002. PCS+ is slated to return to the ISS in late 2004 or early 2005.
A Report on the Findings of an Adult Education Client Impact Study: A Five Year Follow Up.
ERIC Educational Resources Information Center
Moore, Lawrence H.
A 1980 survey of General Educational Development (GED) equivalency certificate recipients who completed the GED test in 1975 measured influence and impact of successful GED completion on the individual. The sample consisted of 101 former adult students whose records came from the Murray and Paducah, Kentucky, GED testing centers. The survey…
Hissbach, Johanna; Feddersen, Lena; Sehner, Susanne; Hampe, Wolfgang
2012-01-01
Aims: Tests with natural-scientific content are predictive of the success in the first semesters of medical studies. Some universities in the German speaking countries use the ‘Test for medical studies’ (TMS) for student selection. One of its test modules, namely “medical and scientific comprehension”, measures the ability for deductive reasoning. In contrast, the Hamburg Assessment Test for Medicine, Natural Sciences (HAM-Nat) evaluates knowledge in natural sciences. In this study the predictive power of the HAM-Nat test will be compared to that of the NatDenk test, which is similar to the TMS module “medical and scientific comprehension” in content and structure. Methods: 162 medical school beginners volunteered to complete either the HAM-Nat (N=77) or the NatDenk test (N=85) in 2007. Until spring 2011, 84.2% of these successfully completed the first part of the medical state examination in Hamburg. Via different logistic regression models we tested the predictive power of high school grade point average (GPA or “Abiturnote”) and the test results (HAM-Nat and NatDenk) with regard to the study success criterion “first part of the medical state examination passed successfully up to the end of the 7th semester” (Success7Sem). The Odds Ratios (OR) for study success are reported. Results: For both test groups a significant correlation existed between test results and study success (HAM-Nat: OR=2.07; NatDenk: OR=2.58). If both admission criteria are estimated in one model, the main effects (GPA: OR=2.45; test: OR=2.32) and their interaction effect (OR=1.80) are significant in the HAM-Nat test group, whereas in the NatDenk test group only the test result (OR=2.21) significantly contributes to the variance explained. Conclusions: On their own both HAM-Nat and NatDenk have predictive power for study success, but only the HAM-Nat explains additional variance if combined with GPA. The selection according to HAM-Nat and GPA has under the current circumstances of medical school selection (many good applicants and only a limited number of available spaces) the highest predictive power of all models. PMID:23255967
VEGA, the European small launcher: Development status, future perspectives, and applications
NASA Astrophysics Data System (ADS)
Bianchi, Stefano; VEGA Integrated Project Team (IPT)
2008-07-01
This paper presents a technical and programmatic overview of the VEGA launch system program currently in development for the European Space Agency, which includes the development and qualification activities of the small launcher VEGA, of the ground infrastructure, and of all the launcher elements. Several programmatic milestones have been successfully achieved so far: most subsystems have gone through the critical design review or qualification review. The launcher system critical design review has been performed during spring 2007 as well. Concerning propulsion, all the three development models of the solid rocket motors have been successfully tested between December 2005 and December 2006. The first qualification model engine of the liquid propulsion upper module has successfully completed its firing campaign and the test campaign for the second model has just started. The liquid upper stage AVUM engine has been tested as well. The VEGA ground segment program has entered its final lapse by completing the detailed design of the various subsystems. The installation phase in the launch range site (Kourou, French Guyane) is in full swing. The integration of the Mobile Gantry, necessary to integrate the launcher, is almost completed as for the main structure.
Sierra Nevada Corporation's Dream Chaser Test Article Altitude T
2017-08-30
Sierra Nevada Corporation’s Dream Chaser completed an important step toward orbital flight with a successful captive carry test at NASA’s Armstrong Flight Research Center in California, located on Edwards Air Force Base. A helicopter successfully carried a Dream Chaser test article, which has the same specifications as a flight-ready spacecraft, to the same altitude and flight conditions of an upcoming free flight test. The Dream Chaser is a lifting-body, winged spacecraft that will fly back to Earth in a manner similar to NASA’s space shuttles. The successful captive carry test clears the way for a free flight test of the spacecraft later this year in which the uncrewed Dream Chaser will be released to glide on its own and land.
Vision function testing for a suprachoroidal retinal prosthesis: effects of image filtering
NASA Astrophysics Data System (ADS)
Barnes, Nick; Scott, Adele F.; Lieby, Paulette; Petoe, Matthew A.; McCarthy, Chris; Stacey, Ashley; Ayton, Lauren N.; Sinclair, Nicholas C.; Shivdasani, Mohit N.; Lovell, Nigel H.; McDermott, Hugh J.; Walker, Janine G.; BVA Consortium,the
2016-06-01
Objective. One strategy to improve the effectiveness of prosthetic vision devices is to process incoming images to ensure that key information can be perceived by the user. This paper presents the first comprehensive results of vision function testing for a suprachoroidal retinal prosthetic device utilizing of 20 stimulating electrodes. Further, we investigate whether using image filtering can improve results on a light localization task for implanted participants compared to minimal vision processing. No controlled implanted participant studies have yet investigated whether vision processing methods that are not task-specific can lead to improved results. Approach. Three participants with profound vision loss from retinitis pigmentosa were implanted with a suprachoroidal retinal prosthesis. All three completed multiple trials of a light localization test, and one participant completed multiple trials of acuity tests. The visual representations used were: Lanczos2 (a high quality Nyquist bandlimited downsampling filter); minimal vision processing (MVP); wide view regional averaging filtering (WV); scrambled; and, system off. Main results. Using Lanczos2, all three participants successfully completed a light localization task and obtained a significantly higher percentage of correct responses than using MVP (p≤slant 0.025) or with system off (p\\lt 0.0001). Further, in a preliminary result using Lanczos2, one participant successfully completed grating acuity and Landolt C tasks, and showed significantly better performance (p=0.004) compared to WV, scrambled and system off on the grating acuity task. Significance. Participants successfully completed vision tasks using a 20 electrode suprachoroidal retinal prosthesis. Vision processing with a Nyquist bandlimited image filter has shown an advantage for a light localization task. This result suggests that this and targeted, more advanced vision processing schemes may become important components of retinal prostheses to enhance performance. ClinicalTrials.gov Identifier: NCT01603576.
Code of Federal Regulations, 2013 CFR
2013-10-01
... completes the form, the person who gave the test shall sign it. (e) If the road test is successfully... 49 Transportation 5 2013-10-01 2013-10-01 false Road test. 391.31 Section 391.31 Transportation... COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Tests § 391.31 Road test. (a) Except as provided in subpart G, a...
Code of Federal Regulations, 2014 CFR
2014-10-01
... completes the form, the person who gave the test shall sign it. (e) If the road test is successfully... 49 Transportation 5 2014-10-01 2014-10-01 false Road test. 391.31 Section 391.31 Transportation... COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Tests § 391.31 Road test. (a) Except as provided in subpart G, a...
Code of Federal Regulations, 2012 CFR
2012-10-01
... completes the form, the person who gave the test shall sign it. (e) If the road test is successfully... 49 Transportation 5 2012-10-01 2012-10-01 false Road test. 391.31 Section 391.31 Transportation... COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Tests § 391.31 Road test. (a) Except as provided in subpart G, a...
Code of Federal Regulations, 2010 CFR
2010-10-01
... completes the form, the person who gave the test shall sign it. (e) If the road test is successfully... 49 Transportation 5 2010-10-01 2010-10-01 false Road test. 391.31 Section 391.31 Transportation... COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Tests § 391.31 Road test. (a) Except as provided in subpart G, a...
Use of Standardized Test Scores to Predict Success in a Computer Applications Course
ERIC Educational Resources Information Center
Harris, Robert V.
2014-01-01
In this educational study, the research problem was that each semester a variable number of community college students are unable to complete an introductory computer applications course at a community college in the state of Mississippi with a successful course letter grade. Course failure, or non-success, at the collegiate level is a negative…
J-2X concludes series of tests
2008-05-09
NASA engineers successfully complete the first series of tests in the early development of the J-2X engine that will power the Ares I and Ares V rockets, key components of NASA's Constellation Program.
Long-Duration, Balloon-Borne Observations of Cosmic Microwave Background Anisotropy
NASA Technical Reports Server (NTRS)
1997-01-01
Funds from this grant were used to support the continuing development of BOOMERANG, a 1.3 m, balloon-borne, attitude-stabilized telescope designed to measure the anisotropy of the Cosmic Microwave Background (CMB) on angular scales of 12 min to 10 degrees. By the end of the funding period covered by this grant, the fabrication of most of the BOOMERANG sub-systems was completed, and integration and test of the payload at Caltech had begun. The project was continued under a new grant from NASA and continuing funding from the NSF. Payload integration and test was completed in April, 1997. A campaign to Palestine, Texas, resulted in two test flights during 1997. A flight on August 12, 1997 was terminated on ascent due to a leaky balloon. The payload was successfully recovered, refurbished, and flown again on August 29, 1997. The second flight was completely successful, and qualified the payload for an LDB flight from McMurdo Stn., Antarctica, in December 1998.
14 CFR 125.296 - Training, testing, and checking conducted by training centers: Special rules.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT Flight Crewmember Requirements § 125.296 Training, testing, and checking conducted by training centers: Special rules. A crewmember who has successfully completed training, testing, or checking in... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Training, testing, and checking conducted...
14 CFR 125.296 - Training, testing, and checking conducted by training centers: Special rules.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT Flight Crewmember Requirements § 125.296 Training, testing, and checking conducted by training centers: Special rules. A crewmember who has successfully completed training, testing, or checking in... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Training, testing, and checking conducted...
14 CFR 125.296 - Training, testing, and checking conducted by training centers: Special rules.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT Flight Crewmember Requirements § 125.296 Training, testing, and checking conducted by training centers: Special rules. A crewmember who has successfully completed training, testing, or checking in... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Training, testing, and checking conducted...
14 CFR 125.296 - Training, testing, and checking conducted by training centers: Special rules.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT Flight Crewmember Requirements § 125.296 Training, testing, and checking conducted by training centers: Special rules. A crewmember who has successfully completed training, testing, or checking in... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Training, testing, and checking conducted...
14 CFR 125.296 - Training, testing, and checking conducted by training centers: Special rules.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT Flight Crewmember Requirements § 125.296 Training, testing, and checking conducted by training centers: Special rules. A crewmember who has successfully completed training, testing, or checking in... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Training, testing, and checking conducted...
49 CFR 384.228 - Examiner training and record checks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the CDL testing program, and with all of the knowledge and skills necessary to serve as a CDL test... knowledge and skills test examiners to successfully complete a formal CDL test examiner training course and examination before certifying them to administer CDL knowledge and skills tests. (c) The training course for...
Large area sheet task: Advanced Dendritic Web Growth Development
NASA Technical Reports Server (NTRS)
Duncan, C. S.; Seidensticker, R. G.; Mchugh, J. P.; Hopkins, R. H.; Meier, D.; Schruben, J.
1981-01-01
A melt level control system was implemented to provide stepless silicon feed rates from zero to rates exactly matching the silicon consumed during web growth. Bench tests of the unit were successfully completed and the system mounted in a web furnace for operational verification. Tests of long term temperature drift correction techniques were made; web width monitoring seems most appropriate for feedback purposes. A system to program the initiation of the web growth cycle was successfully tested. A low cost temperature controller was tested which functions as well as units four times as expensive.
Improving older adults' memory performance using prior task success.
Geraci, Lisa; Miller, Tyler M
2013-06-01
Holding negative aging stereotypes can lead older adults to perform poorly on memory tests. We attempted to improve older adults' memory performance by giving them task experience that would counter their negative performance expectations. Before participating in a memory experiment, younger and older adults were given a cognitive task that they could either successfully complete, not successfully complete, or they were given no prior task. For older adults, recall was significantly higher and self-reported anxiety was significantly lower for the prior task success group relative to the other groups. There was no effect of prior task experience on younger adults' memory performance. Results suggest that older adults' memory can be improved with a single successful prior task experience. PsycINFO Database Record (c) 2013 APA, all rights reserved.
McLachlan, E.; Anderson, S.; Hawkes, D.; Saville, M.; Arabena, K.
2018-01-01
Objectives To examine factors that enhance under-screened and never-screened women’s completion of the self-collection alternative pathway of the Renewed National Cervical Screening Program (ncsp) in Victoria, Australia. Background With the Australian ncsp changing, starting on 1 December 2017, the Medical Services Advisory Committee (msac) recommended implementing human papillomavirus (hpv) testing using a self-collected sample for under-screened and never-screened populations. In response, a multi-agency group implemented an hpv self-collection pilot project to trial self-collection screening pathways for eligible women. Methods Quantitative data were collected on participation rates and compliance rates with follow-up procedures across three primary health care settings. Forty women who self-collected were interviewed in a semi-structured format, and seven agency staff completed in-depth interviews. Qualitative data were used to identify and understand clinical and personal enablers that assisted women to complete self-collection cervical screening pathways successfully. Results Eighty-five per cent (10 women) of participants who tested positive for hpv successfully received their results and completed follow-up procedures as required. Two remaining participants also received hpv-positive results. However, agencies were unable to engage them in follow-up services and procedures. The overall participation rate in screening (self-collection or Pap test) was 85.7% (84 women), with 79 women self-collecting. Qualitative data indicated that clear explanations on self-collection, development of trusting, empathetic relationships with health professionals, and recognition of participants’ past experiences were critical to the successful completion of the self-collection pathway. When asked about possible inhibitors to screening and to following up on results and appointments, women cited poor physical and mental health, as well as financial and other structural barriers. Conclusion A well-implemented process, led by trusted, knowledgeable, and engaged health care professionals who can provide appropriate support and information, can assist under-screened and never-screened women to complete the hpv self-collection pathway successfully. PMID:29507491
ERIC Educational Resources Information Center
Gün, Mesut
2016-01-01
The purpose of this empirical study is to determine how and to what extent the use of animations impacts auditory acquisition, one of the key learning fields in 6th grade grammar, as measured by students' academic success and completion rates. By using a pre-test and post-test design, this empirical study randomly divided a group of Turkish 6th…
2010-04-01
life and/or prevent the successful completion of a near -term military mission. The memo defines immediate warfighter needs as urgent operational...successful completion of a near -term military mission. An executive director leads JRAC and reports to the Director, Rapid Fielding, within DDR&E and...performance assessment of the experimental HMDS prior to them making a decision to purchase it in large numbers. Testing for the HMDS officially began in
NASA Astrophysics Data System (ADS)
Liland, Kristian Hovde; Snipen, Lars
When a series of Bernoulli trials occur within a fixed time frame or limited space, it is often interesting to assess if the successful outcomes have occurred completely at random, or if they tend to group together. One example, in genetics, is detecting grouping of genes within a genome. Approximations of the distribution of successes are possible, but they become inaccurate for small sample sizes. In this article, we describe the exact distribution of time between random, non-overlapping successes in discrete time of fixed length. A complete description of the probability mass function, the cumulative distribution function, mean, variance and recurrence relation is included. We propose an associated test for the over-representation of short distances and illustrate the methodology through relevant examples. The theory is implemented in an R package including probability mass, cumulative distribution, quantile function, random number generator, simulation functions, and functions for testing.
NASA's Space Launch System: Progress Report
NASA Technical Reports Server (NTRS)
Cook, Jerry; Lyles, Garry
2017-01-01
NASA and its commercial industry team achieved significant progress in 2016 in manufacturing and testing of the Block 1 vehicle for the first launch of the Space Launch System (SLS). Test and flight article hardware for the liquid hydrogen fuel tank as well as the engine section for the core stage were completed at Michoud Assembly Facility (MAF) in New Orleans. Test stands neared completion at Marshall Space Flight Center for the propellant tanks, engine section, intertank and payload section. Stennis Space Center completed major structural renovations on the B2 test stand, where the core stage "green run" test program will be conducted. The SLS team completed a hotfire test series at Stennis to successfully demonstrate the ability of the RS-25 engine to operate under SLS environments and performance conditions. The team also test fired the second qualification five-segment solid rocket motor and cast the first six motor segments for the first SLS mission. The Interim Cryogenic Propulsion Stage (ICPS) test article was delivered to Marshall for structural tests, and work is nearly finished on the flight stage. Flight software testing completed at Marshall included power quality and command and data handling. In 2017, that work continues. SLS completed Preliminary Design Review (PDR) on the Exploration Upper Stage (EUS), a powerful, human-rated spacecraft that will propel explorers to cis-lunar space. In 2017, hardware will continue to be integrated at MAF for core stage structural test articles and the first two operational flights. RS-25 hotfire testing will continue to explore engine performance, as well as test flight-like software and four new Engine Controller Units (ECUs) for the first mission. Production of development components for a more affordable RS-25 design is underway. Core stage structural test articles have begun arriving at Marshall. While engineering challenges typical of a new development are possible, SLS is working toward launch readiness in late 2018. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before first flight
Electric power system test and verification program
NASA Technical Reports Server (NTRS)
Rylicki, Daniel S.; Robinson, Frank, Jr.
1994-01-01
Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.
NASA Technical Reports Server (NTRS)
1978-01-01
The component testing of a ball spline variable pitch mechanism is described including a whirligig test. The variable pitch actuator successfully completed all planned whirligig tests including a fifty cycle endurance test at actuation rates up to 125 deg per second at up to 102 percent fan speed (3400 rpm).
The phase II of this project was successfully completed with field tests being presently underway. It was found from the laboratory study that the fly ash slurry had sufficient thickening time and could be pumped successfully through coiled and straight tubing. Pumping through...
ERIC Educational Resources Information Center
Florida Department of Education, 2017
2017-01-01
This document is provided by the Florida Department of Education to help prepare Adult and Career and Technical Students to take the Tests of Adult Basic Education (TABE) test. These tests are used to determine students' strengths that will assist them in successfully completing their programs. The TABE has three major areas: Reading, Language,…
Minimal Impact of Organic Chemistry Prerequisite on Student Performance in Introductory Biochemistry
ERIC Educational Resources Information Center
Wright, Robin; Cotner, Sehoya; Winkel, Amy
2009-01-01
Curriculum design assumes that successful completion of prerequisite courses will have a positive impact on student performance in courses that require the prerequisite. We recently had the opportunity to test this assumption concerning the relationship between completion of the organic chemistry prerequisite and performance in introductory…
The CF6 jet engine performance improvement: New front mount
NASA Technical Reports Server (NTRS)
Fasching, W. A.
1979-01-01
The New Front Mount was evaluated in component tests including stress, deflection/distortion and fatigue tests. The test results demonstrated a performance improvement of 0.1% in cruise sfc, 16% in compressor stall margin and 10% in compressor stator angle margin. The New Front Mount hardware successfully completed 35,000 simulated flight cycles endurance testing.
An antenna pointing mechanism for large reflector antennas
NASA Technical Reports Server (NTRS)
Heimerdinger, H.
1981-01-01
An antenna pointing mechanism for large reflector antennas on direct broadcasting communication satellites was built and tested. After listing the requirements and constraints for this equipment the model is described, and performance figures are given. Futhermore, results of the qualification level tests, including functional, vibrational, thermovacuum, and accelerated life tests are reported. These tests were completed successfully.
Operability test report for the in SITU vapor sampling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corbett, J.E., Westinghouse Hanford
1996-05-31
This report documents the successful completion of testing for the In Situ Vapor Sampling (ISVS) system. The report includes the test procedure (WHC-SD-WM-OTP-196, Rev OA), data sheets, exception resolutions, and a test report summary. This report conforms to the guidelines established in WHC-IP-1026, `Engineering Practice Guidelines,` Appendix L, `Operability Test Procedures and Reports.`
78 FR 69459 - Vogtle Unit 3 Combined License
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-19
... AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and... the inspections, tests, and analyses have been successfully completed, and that the specified... public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville...
78 FR 73894 - Vogtle Unit 4 Combined License
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
... AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and... the inspections, tests, and analyses have been successfully completed, and that the specified... public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville...
Composite armored vehicle advanced technology demonstator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ostberg, D.T.; Dunfee, R.S.; Thomas, G.E.
1996-12-31
Composite structures are a key technology needed to develop future lightweight combat vehicles that are both deployable and survivable. The Composite Armored Vehicle Advanced Technology Demonstrator Program that started in fiscal year 1994 will continue through 1998 to verily that composite structures are a viable solution for ground combat vehicles. Testing thus far includes material characterization, structural component tests and full scale quarter section tests. Material and manufacturing considerations, tests, results and changes, and the status of the program will be described. The structural component tests have been completed successfully, and quarter section testing is in progress. Upon completion ofmore » the critical design review, the vehicle demonstrator will be Fabricated and undergo government testing.« less
ERIC Educational Resources Information Center
Arasmith, E. E.
Designed for individuals who have completed National Pollutant Discharge Elimination System (NPDES) level 1 laboratory training skills, this module provides waste water treatment plant operators with the basic information needed to: (1) successfully run a centrifuge test; (2) accurately read results obtained in test tubes; and (3) obtain…
33 CFR 156.170 - Equipment tests and inspections.
Code of Federal Regulations, 2014 CFR
2014-07-01
... distort under static liquid pressure at least 11/2 times the maximum allowable working pressure; and (iv... static liquid pressure test is successfully completed in the presence of the COTP. The test medium is not... static liquid pressure at least 11/2 times the maximum allowable working pressure; and (5) Each item of...
33 CFR 156.170 - Equipment tests and inspections.
Code of Federal Regulations, 2012 CFR
2012-07-01
... distort under static liquid pressure at least 11/2 times the maximum allowable working pressure; and (iv... static liquid pressure test is successfully completed in the presence of the COTP. The test medium is not... static liquid pressure at least 11/2 times the maximum allowable working pressure; and (5) Each item of...
33 CFR 156.170 - Equipment tests and inspections.
Code of Federal Regulations, 2013 CFR
2013-07-01
... distort under static liquid pressure at least 11/2 times the maximum allowable working pressure; and (iv... static liquid pressure test is successfully completed in the presence of the COTP. The test medium is not... static liquid pressure at least 11/2 times the maximum allowable working pressure; and (5) Each item of...
Complete braided adsorbent for marine testing to demonstrate 3g-U/kg-adsorbent
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janke, Chris; Yatsandra, Oyola; Mayes, Richard
ORNL has manufactured four braided adsorbents that successfully demonstrated uranium adsorption capacities ranging from 3.0-3.6 g-U/kg-adsorbent in marine testing at PNNL. Four new braided and leno woven fabric adsorbents have also been prepared by ORNL and are currently undergoing marine testing at PNNL.
NASA Technical Reports Server (NTRS)
1998-01-01
SpaceAge Control, Inc., was established in 1968 to design, develop and manufacture pilot protection devices in support of space-based and high-performance test aircraft programs. In 1970, the company was awarded a NASA contract to produce precision, small-format position transducers for aircraft flight control testing. The successful completion of this contract led to the development and production of a complete line of position transducers. Today the company has over 600 customers in 20 industries and over 30 countries.
Centaur liquid oxygen boost pump vibration test
NASA Technical Reports Server (NTRS)
Tang, H. M.
1975-01-01
The Centaur LOX boost pump was subjected to both the simulated Titan Centaur proof flight and confidence demonstration vibration test levels. For each test level, both sinusoidal and random vibration tests were conducted along each of the three orthogonal axes of the pump and turbine assembly. In addition to these tests, low frequency longitudinal vibration tests for both levels were conducted. All tests were successfully completed without damage to the boost pump.
Design and fabrication of complete dentures using CAD/CAM technology
Han, Weili; Li, Yanfeng; Zhang, Yue; lv, Yuan; Zhang, Ying; Hu, Ping; Liu, Huanyue; Ma, Zheng; Shen, Yi
2017-01-01
Abstract The aim of the study was to test the feasibility of using commercially available computer-aided design and computer-aided manufacturing (CAD/CAM) technology including 3Shape Dental System 2013 trial version, WIELAND V2.0.049 and WIELAND ZENOTEC T1 milling machine to design and fabricate complete dentures. The modeling process of full denture available in the trial version of 3Shape Dental System 2013 was used to design virtual complete dentures on the basis of 3-dimensional (3D) digital edentulous models generated from the physical models. The virtual complete dentures designed were exported to CAM software of WIELAND V2.0.049. A WIELAND ZENOTEC T1 milling machine controlled by the CAM software was used to fabricate physical dentitions and baseplates by milling acrylic resin composite plates. The physical dentitions were bonded to the corresponding baseplates to form the maxillary and mandibular complete dentures. Virtual complete dentures were successfully designed using the software through several steps including generation of 3D digital edentulous models, model analysis, arrangement of artificial teeth, trimming relief area, and occlusal adjustment. Physical dentitions and baseplates were successfully fabricated according to the designed virtual complete dentures using milling machine controlled by a CAM software. Bonding physical dentitions to the corresponding baseplates generated the final physical complete dentures. Our study demonstrated that complete dentures could be successfully designed and fabricated by using CAD/CAM. PMID:28072686
Student Accounts of the Ontario Secondary School Literacy Test: A Case for Validation
ERIC Educational Resources Information Center
Cheng, Liying; Fox, Janna; Zheng, Ying
2007-01-01
The Ontario Secondary School Literacy Test (OSSLT) is a cross-curricular literacy test issued to all secondary school students in the province of Ontario. The test consists of a reading and a writing component, both of which must be successfully completed for secondary school graduation in Ontario. This study elicited 16 first language and second…
Apollo-Soyuz test project docking system
NASA Technical Reports Server (NTRS)
Swan, W. L., Jr.
1976-01-01
The United States and Soviet Union in July 1975 successfully completed a joint space mission utilizing each country's spacecraft and the compatible docking system designed and fabricated by each country. The compatible docking system is described, along with the extensive research, development, and testing leading up to the successful mission. It also describes the formulation and implementation of methods for breaking the language barrier, bridging the extensive distances for communication and travel, and adjusting to each country's different culture during the three-year development program.
Development and fabrication of a solar cell junction processing system
NASA Technical Reports Server (NTRS)
Bunker, S.
1981-01-01
A solar cell junction processing system was developed and fabricated. A pulsed electron beam for the four inch wafers is being assembled and tested, wafers were successfully pulsed, and solar cells fabricated. Assembly of the transport locks is completed. The transport was operated successfully but not with sufficient reproducibility. An experiment test facility to examine potential scaleup problems associated with the proposed ion implanter design was constructed and operated. Cells were implanted and found to have efficiency identical to the normal Spire implant process.
A theoretical/experimental program to develop active optical pollution sensors
NASA Technical Reports Server (NTRS)
Mills, F. S.; Blais, R. N.; Kindle, E. C.
1977-01-01
Light detection and ranging (LIDAR) technology was applied to the assessment of air quality, and its usefulness was evaluated by actual field tests. Necessary hardware was successfully constructed and operated in the field. Measurements of necessary physical parameters, such as SO2 absorption coefficients were successfully completed and theoretical predictions of differential absorption performance were reported. Plume modeling improvements were proposed. A full scale field test of equipment, data analysis and auxiliary data support was conducted in Maryland during September 1976.
Cognitive Style and Self-Efficacy: Predicting Student Success in Online Distance Education
ERIC Educational Resources Information Center
DeTure, Monica
2004-01-01
This study was designed to identify those learner attributes that may be used to predict student success (in terms of grade point average) in a Web-based distance education setting. Students enrolled in six Web-based, general education distance education courses at a community college were asked to complete the Group Embedded Figures Test for…
ERIC Educational Resources Information Center
Harvey, Virginia Smith; Chickie-Wolfe, Louise A.; Eads, James B.
2007-01-01
Accessible, practical, and empowering, this book gives school professionals the tools to put students in charge of their own learning. Going beyond traditional "study skills" guides that focus on the mechanics of homework completion and test taking, the authors address the underlying psychological factors that influence academic success and…
Ultimate Success Rates on National Board Examinations: A Research Brief.
ERIC Educational Resources Information Center
Gross, Leon J.; Wallis, Norman E.; Present, Richard K.
1999-01-01
A study investigated the percentage of optometry students successfully completing the four-component National Board of Examiners in Optometry examination at graduation between 1995 to 1997. Ultimate pass rates for all four components ranged from 87.0% to 90.9%. Results are discussed in relation to the 1993 test-sequence expansion and to the number…
NASA Astrophysics Data System (ADS)
Näsilä, Antti; Holmlund, Christer; Mannila, Rami; Näkki, Ismo; Ojanen, Harri J.; Akujärvi, Altti; Saari, Heikki; Fussen, Didier; Pieroux, Didier; Demoulin, Philippe
2016-10-01
PICASSO - A PICo-satellite for Atmospheric and Space Science Observations is an ESA project led by the Belgian Institute for Space Aeronomy, in collaboration with VTT Technical Research Centre of Finland Ltd, Clyde Space Ltd. (UK) and Centre Spatial de Liège (BE). The test campaign for the engineering model of the PICASSO VISION instrument, a miniaturized nanosatellite spectral imager, has been successfully completed. The test results look very promising. The proto-flight model of VISION has also been successfully integrated and it is waiting for the final integration to the satellite platform.
Geber, S; Lemgruber, M; Taitson, P F; Valle, M; Sampaio, M
2012-05-01
This case report demonstrates a successful pregnancy after ICSI combined with hypo-osmotic swelling test in a couple with Kartagener's syndrome with complete immotile ejaculated spermatozoa. Our result suggests that even for complete immotile spermatozoa, the use of hypo-osmotic swelling test is a good alternative to identify viable spermatozoa. When associated with ICSI, it can be a valuable tool to get fertilisation and pregnancy. © 2011 Blackwell Verlag GmbH.
A Space Acquisition Leading Indicator Based on System Interoperation Maturity
2010-12-01
delivered hardware, improper use of soldering materials, improper installation of thermal blankets , and missing test procedure documentation A poor...office, the first GEO integrated payload and spacecraft successfully completed thermal vacuum (TVAC) testing in November 2009. Program officials...contamination in delivered hardware, improper use of soldering materials, improper installation of thermal blankets , and missing test procedure
Thermal Vacuum/Balance Test Results of Swift BAT with Loop Heat Pipe Thermal System
NASA Technical Reports Server (NTRS)
Choi, Michael K.
2004-01-01
The Swift Burst Alert Telescope (BAT) Detector Array is thermally well coupled to eight constant conductance heat pipes (CCHPs) embedded in the Detector Array Plate PAP), and two loop heat pipes (LHPs) transport heat from the CCHPs to a radiator. The CCHPs have ammonia as the working fluid and the LHPs have propylene as the working fluid. Precision heater controllers, which have adjustable set points in flight, are used to control the LHP compensation chamber and Detector Array xA1 ASIC temperatures. The radiator has AZ-Tek's AZW-LA-II low solar absorptance white paint as the thermal coating, and is located on the anti-sun side of the spacecraft. A thermal balance (T/B) test on the BAT was successfully completed. It validated that the thermal design satisfies the temperature requirements of the BAT in the flight thermal environments. Instrument level and observatory level thermal vacuum (TN) cycling tests of the BAT Detector Array by using the LHP thermal system were successfully completed. This paper presents the results of the T/B test and T N cycling tests.
Orbital express capture system: concept to reality
NASA Astrophysics Data System (ADS)
Stamm, Shane; Motaghedi, Pejmun
2004-08-01
The development of autonomous servicing of on-orbit spacecraft has been a sought after objective for many years. A critical component of on-orbit servicing involves the ability to successfully capture, institute mate, and perform electrical and fluid transfers autonomously. As part of a Small Business Innovation Research (SBIR) grant, Starsys Research Corporation (SRC) began developing such a system. Phase I of the grant started in 1999, with initial work focusing on simultaneously defining the parameters associated with successful docking while designing to those parameters. Despite the challenge of working without specific requirements, SRC completed development of a prototype design in 2000. Throughout the following year, testing was conducted on the prototype to characterize its performance. Having successfully completed work on the prototype, SRC began a Phase II SBIR effort in mid-2001. The focus of the second phase was a commercialization effort designed to augment the prototype model into a more flight-like design. The technical requirements, however, still needed clear definition for the design to progress. The advent of the Orbital Express (OE) program provided much of that definition. While still in the proposal stages of the OE program, SRC began tailoring prototype redesign efforts to the OE program requirements. A primary challenge involved striking a balance between addressing the technical requirements of OE while designing within the scope of the SBIR. Upon award of the OE contract, the Phase II SBIR design has been fully developed. This new design, designated the Mechanical Docking System (MDS), successfully incorporated many of the requirements of the OE program. SRC is now completing dynamic testing on the MDS hardware, with a parallel effort of developing a flight design for OE. As testing on the MDS progresses, the design path that was once common to both SBIR effort and the OE program begins to diverge. The MDS will complete the scope of the Phase II SBIR work, while the new mechanism, the Orbital Express Capture System, will emerge as a flight-qualified design for the Orbital Express program.
ERIC Educational Resources Information Center
Dunn, Thomas G.; And Others
The feasibility of completely automating the Minnesota Multiphasic Personality Inventory (MMPI) was tested, and item response latencies were compared with other MMPI item characteristics. A total of 26 scales were successfully scored automatically for 165 subjects. The program also typed a Mayo Clinic interpretive report on a computer terminal,…
Preliminary recommendations for seedspotting sugar pine in southwest Oregon.
William I. Stein
1955-01-01
Experiments in seedspotting sugar pine have been conducted for more than 3 years in the South Umpqua drainage of southwestern Oregon. Observations from studies in progress and results of completed studies have indicated some of the necessary requirements for success. Though not complete and fully tested, this information is summarized for use in field projects. Some of...
14 CFR 25.562 - Emergency landing dynamic conditions.
Code of Federal Regulations, 2010 CFR
2010-01-01
....562 Emergency landing dynamic conditions. (a) The seat and restraint system in the airplane must be... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Emergency landing dynamic conditions. 25... successfully complete dynamic tests or be demonstrated by rational analysis based on dynamic tests of a similar...
14 CFR 27.562 - Emergency landing dynamic conditions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Emergency landing dynamic conditions. 27... Conditions § 27.562 Emergency landing dynamic conditions. (a) The rotorcraft, although it may be damaged in... must successfully complete dynamic tests or be demonstrated by rational analysis based on dynamic tests...
Submaximal Treadmill Exercise Test to Predict VO[subscript 2]max in Fit Adults
ERIC Educational Resources Information Center
Vehrs, Pat R.; George, James D.; Fellingham, Gilbert W.; Plowman, Sharon A.; Dustman-Allen, Kymberli
2007-01-01
This study was designed to develop a single-stage submaximal treadmill jogging (TMJ) test to predict VO[subscript 2]max in fit adults. Participants (N = 400; men = 250 and women = 150), ages 18 to 40 years, successfully completed a maximal graded exercise test (GXT) at 1 of 3 laboratories to determine VO[subscript 2]max. The TMJ test was completed…
B-52B/DTV (Drop Test Vehicle) flight test results: Drop test missions
NASA Technical Reports Server (NTRS)
Doty, L. J.
1985-01-01
The NASA test airplane, B-52B-008, was a carrier for drop tests of the shuttle booster recovery parachute system. The purpose of the test support by Boeing was to monitor the vertical loads on the pylon hooks. The hooks hold the Drop Test Vehicle to the B-52 pylon during drop test missions. The loads were monitored to assure the successful completion of the flight and the safety of the crew.
NASA Astrophysics Data System (ADS)
Corsi, Gianluca
2011-12-01
Web-based technology has revolutionized the way education is delivered. Although the advantages of online learning appeal to large numbers of students, some concerns arise. One major concern in online science education is the value that participation in labs has on student performance. The purpose of this study was to assess the relationships between lab completion and student academic success as measured by test grades, scientific self-confidence, scientific skills, and concept mastery. A random sample of 114 volunteer undergraduate students, from an online Environmental Science program at the American Public University System, was tested. The study followed a quantitative, non-experimental research design. Paired sample t-tests were used for statistical comparison between pre-lab and post-lab test grades, two scientific skills quizzes, and two scientific self-confidence surveys administered at the beginning and at the end of the course. The results of the paired sample t-tests revealed statistically significant improvements on all post-lab test scores: Air Pollution lab, t(112) = 6.759, p < .001; Home Chemicals lab t(114) = 8.585, p < .001; Water Use lab, t(116) = 6.657, p < .001; Trees and Carbon lab, t(113) = 9.921, p < .001; Stratospheric Ozone lab, t(112) =12.974, p < .001; Renewable Energy lab, t(115) = 7.369, p < .001. The end of the course Scientific Skills quiz revealed statistically significant improvements, t(112) = 8.221, p < .001. The results of the two surveys showed a statistically significant improvement on student Scientific Self-Confidence because of lab completion, t(114) = 3.015, p < .05. Because age and gender were available, regression models were developed. The results indicated weak multiple correlation coefficients and were not statistically significant at alpha = .05. Evidence suggests that labs play a positive role in a student's academic success. It is recommended that lab experiences be included in all online Environmental Science programs, with emphasis on open-ended inquiries, and adoption of online tools to enhance hands-on experiences, such as virtual reality platforms and digital animations. Future research is encouraged to investigate possible correlations between socio-demographic attributes and academic success of students enrolled in online science programs in reference to lab completion.
Is Mental Rotation Ability a Predictor of Success for Motor Performance?
ERIC Educational Resources Information Center
Hoyek, Nady; Champely, Stéphane; Collet, Christian; Fargier, Patrick; Guillot, Aymeric
2014-01-01
Previous studies provided evidence of a relationship between mental rotation (MR) and motor processes in children and adults. However, there is no direct evidence that MR ability is a reliable predictor of success for motor performance. After completion of a MR test, the motor performance of 7- to 8-year-old and 11- to 12-year-old children was…
Online versus in the Classroom: Student Success in a Hands-On Lab Class
ERIC Educational Resources Information Center
Reuter, Ron
2009-01-01
This study compares learning success of online and on-campus students in a general education soil science course with lab and field components. Two terms of students completed standardized pre- and postassessments designed to test knowledge and skills from the lecture and lab content of the course. There was no difference in overall grade or lab…
Pant Pai, Nitika; Behlim, Tarannum; Abrahams, Lameze; Vadnais, Caroline; Shivkumar, Sushmita; Pillay, Sabrina; Binder, Anke; Deli-Houssein, Roni; Engel, Nora; Joseph, Lawrence; Dheda, Keertan
2013-01-01
Background In South Africa, stigma, discrimination, social visibility and fear of loss of confidentiality impede health facility-based HIV testing. With 50% of adults having ever tested for HIV in their lifetime, private, alternative testing options are urgently needed. Non-invasive, oral self-tests offer a potential for a confidential, unsupervised HIV self-testing option, but global data are limited. Methods A pilot cross-sectional study was conducted from January to June 2012 in health care workers based at the University of Cape Town, South Africa. An innovative, unsupervised, self-testing strategy was evaluated for feasibility; defined as completion of self-testing process (i.e., self test conduct, interpretation and linkage). An oral point-of-care HIV test, an Internet and paper-based self-test HIV applications, and mobile phones were synergized to create an unsupervised strategy. Self-tests were additionally confirmed with rapid tests on site and laboratory tests. Of 270 health care workers (18 years and above, of unknown HIV status approached), 251 consented for participation. Findings Overall, about 91% participants rated a positive experience with the strategy. Of 251 participants, 126 evaluated the Internet and 125 the paper-based application successfully; completion rate of 99.2%. All sero-positives were linked to treatment (completion rate:100% (95% CI, 66.0–100). About half of sero-negatives were offered counselling on mobile phones; completion rate: 44.6% (95% CI, 38.0–51.0). A majority of participants (78.1%) were females, aged 18–24 years (61.4%). Nine participants were found sero-positive after confirmatory tests (prevalence 3.6% 95% CI, 1.8–6.9). Six of nine positive self-tests were accurately interpreted; sensitivity: 66.7% (95% CI, 30.9–91.0); specificity:100% (95% CI, 98.1–100). Interpretation Our unsupervised self-testing strategy was feasible to operationalize in health care workers in South Africa. Linkages were successfully operationalized with mobile phones in all sero-positives and about half of the sero-negatives sought post-test counselling. Controlled trials and implementation research studies are needed before a scale-up is considered. PMID:24312185
Pant Pai, Nitika; Behlim, Tarannum; Abrahams, Lameze; Vadnais, Caroline; Shivkumar, Sushmita; Pillay, Sabrina; Binder, Anke; Deli-Houssein, Roni; Engel, Nora; Joseph, Lawrence; Dheda, Keertan
2013-01-01
In South Africa, stigma, discrimination, social visibility and fear of loss of confidentiality impede health facility-based HIV testing. With 50% of adults having ever tested for HIV in their lifetime, private, alternative testing options are urgently needed. Non-invasive, oral self-tests offer a potential for a confidential, unsupervised HIV self-testing option, but global data are limited. A pilot cross-sectional study was conducted from January to June 2012 in health care workers based at the University of Cape Town, South Africa. An innovative, unsupervised, self-testing strategy was evaluated for feasibility; defined as completion of self-testing process (i.e., self test conduct, interpretation and linkage). An oral point-of-care HIV test, an Internet and paper-based self-test HIV applications, and mobile phones were synergized to create an unsupervised strategy. Self-tests were additionally confirmed with rapid tests on site and laboratory tests. Of 270 health care workers (18 years and above, of unknown HIV status approached), 251 consented for participation. Overall, about 91% participants rated a positive experience with the strategy. Of 251 participants, 126 evaluated the Internet and 125 the paper-based application successfully; completion rate of 99.2%. All sero-positives were linked to treatment (completion rate:100% (95% CI, 66.0-100). About half of sero-negatives were offered counselling on mobile phones; completion rate: 44.6% (95% CI, 38.0-51.0). A majority of participants (78.1%) were females, aged 18-24 years (61.4%). Nine participants were found sero-positive after confirmatory tests (prevalence 3.6% 95% CI, 1.8-6.9). Six of nine positive self-tests were accurately interpreted; sensitivity: 66.7% (95% CI, 30.9-91.0); specificity:100% (95% CI, 98.1-100). Our unsupervised self-testing strategy was feasible to operationalize in health care workers in South Africa. Linkages were successfully operationalized with mobile phones in all sero-positives and about half of the sero-negatives sought post-test counselling. Controlled trials and implementation research studies are needed before a scale-up is considered.
In Vitro Plant Regeneration from Commercial Cultivars of Soybean
Raza, Ghulam; Singh, Mohan B.
2017-01-01
Soybean, a major legume crop, is the source of vegetable oil and protein. There is a need for transgenic approaches to breeding superior soybean varieties to meet future climate challenges. Efficient plant regeneration is a prerequisite for successful application of genetic transformation technology. Soybean cultivars are classified into different maturity groups based on photoperiod requirements. In this study, nine soybean varieties belonging to different maturity group were regenerated successfully from three different explants: half split hypocotyl, complete hypocotyl, and cotyledonary node. All the genotypes and explant types responded by producing adventitious shoots. Shoot induction potential ranged within 60–87%, 50–100%, and 75–100%, and regeneration rate ranged within 4.2–10, 2.7–4.2, and 2.6–10.5 shoots per explant using half split hypocotyl, complete hypocotyl, and cotyledonary explants, respectively, among all the tested genotypes. Bunya variety showed the best regeneration response using half split and complete hypocotyl explants and the PNR791 with cotyledonary node. The regenerated shoots were successfully rooted and acclimatized to glasshouse conditions. This study shows that commercial varieties of soybean are amenable to shoot regeneration with high regeneration frequencies and could be exploited for genetic transformation. Further, our results show no correlation between shoots regeneration capacity with the maturity grouping of the soybean cultivars tested. PMID:28691031
In Vitro Plant Regeneration from Commercial Cultivars of Soybean.
Raza, Ghulam; Singh, Mohan B; Bhalla, Prem L
2017-01-01
Soybean, a major legume crop, is the source of vegetable oil and protein. There is a need for transgenic approaches to breeding superior soybean varieties to meet future climate challenges. Efficient plant regeneration is a prerequisite for successful application of genetic transformation technology. Soybean cultivars are classified into different maturity groups based on photoperiod requirements. In this study, nine soybean varieties belonging to different maturity group were regenerated successfully from three different explants: half split hypocotyl, complete hypocotyl, and cotyledonary node. All the genotypes and explant types responded by producing adventitious shoots. Shoot induction potential ranged within 60-87%, 50-100%, and 75-100%, and regeneration rate ranged within 4.2-10, 2.7-4.2, and 2.6-10.5 shoots per explant using half split hypocotyl, complete hypocotyl, and cotyledonary explants, respectively, among all the tested genotypes. Bunya variety showed the best regeneration response using half split and complete hypocotyl explants and the PNR791 with cotyledonary node. The regenerated shoots were successfully rooted and acclimatized to glasshouse conditions. This study shows that commercial varieties of soybean are amenable to shoot regeneration with high regeneration frequencies and could be exploited for genetic transformation. Further, our results show no correlation between shoots regeneration capacity with the maturity grouping of the soybean cultivars tested.
Development of a ninety string solar array simulator
NASA Technical Reports Server (NTRS)
Vasek, Thomas E.; Birchenough, Arthur G.
1991-01-01
A power source was developed to support testing for the Space Station Freedom Power Management and Distribution (PMAD) DC Testbed. The intent was to simulate as closely as possible the steady-state and transient responses of a solar array. Several breadboards and one thermal prototype were built and tested. Responses were successfully verified and improved upon during successive breadboards. The completed 90-string simulator consists of four power MOSFETs, four 25 watt source resistors, and four 250 watt drain source bypass resistors per string, in addition to the control circuitry.
Electrically scanning microwave radiometer for Nimbus E
NASA Technical Reports Server (NTRS)
1973-01-01
An electronically scanning microwave radiometer system has been designed, developed, and tested for measurement of meteorological, geomorphological and oceanographic parameters from NASA/GSFC's Nimbus E satellite. The system is a completely integrated radiometer designed to measure the microwave brightness temperature of the earth and its atmosphere at a microwave frequency of 19.35 GHz. Calibration and environmental testing of the system have successfully demonstrated its ability to perform accurate measurements in a satellite environment. The successful launch and data acquisition of the Nimbus 5 (formerly Nimbus E) gives further demonstration to its achievement.
Visual Schedule System in Dental Care for Patients with Autism: A Pilot Study.
Mah, Janet Wt; Tsang, Phoebe
A pilot study to test whether a visual schedule system using picture communication symbols can help children with autism have successful routine dental cleaning visits. 14 boys with autism between three- to eight-years-old presented to the dental clinic for four weekly consecutive dental appointments. Patients were randomly assigned to either the control group who received the tell-show-do method (i.e., standard of care), or the test group who received the tell-show-do method plus the visual schedule system. Patients in the test group completed an average of 1.38 more steps, at 35.52 seconds per step faster, and with 18.7% lower levels of behavioral distress than those in the control group. The use of a visual schedule system, along with repeated weekly visits, showed some promise in helping children with autism successfully complete more steps, progress at a quicker rate, and exhibit lower levels of behavioral distress within a dental appointment, compared to a traditional tell-show-do approach.
Design and Flight Performance of the Orion Pre-Launch Navigation System
NASA Technical Reports Server (NTRS)
Zanetti, Renato
2016-01-01
Launched in December 2014 atop a Delta IV Heavy from the Kennedy Space Center, the Orion vehicle's Exploration Flight Test-1 (EFT-1) successfully completed the objective to test the prelaunch and entry components of the system. Orion's pre-launch absolute navigation design is presented, together with its EFT-1 performance.
ERIC Educational Resources Information Center
Wooley, John F.
Designed for individuals who have completed National Pollutant Discharge Elimination System (NPDES) level 1 laboratory training skills, this module on digestor gas analysis provides waste water treatment plant operators with the basic skills and information needed to: (1) successfully run the carbon dioxide analysis test; (2) accurately record…
49 CFR 391.11 - General qualifications of drivers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... vehicle under the rules in § 391.15; and (8) Has successfully completed a driver's road test and has been issued a certificate of driver's road test in accordance with § 391.31, or has presented an operator's...
49 CFR 391.11 - General qualifications of drivers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... vehicle under the rules in § 391.15; and (8) Has successfully completed a driver's road test and has been issued a certificate of driver's road test in accordance with § 391.31, or has presented an operator's...
49 CFR 391.11 - General qualifications of drivers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... vehicle under the rules in § 391.15; and (8) Has successfully completed a driver's road test and has been issued a certificate of driver's road test in accordance with § 391.31, or has presented an operator's...
49 CFR 391.11 - General qualifications of drivers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... vehicle under the rules in § 391.15; and (8) Has successfully completed a driver's road test and has been issued a certificate of driver's road test in accordance with § 391.31, or has presented an operator's...
49 CFR 391.11 - General qualifications of drivers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... vehicle under the rules in § 391.15; and (8) Has successfully completed a driver's road test and has been issued a certificate of driver's road test in accordance with § 391.31, or has presented an operator's...
15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria
Code of Federal Regulations, 2010 CFR
2010-01-01
... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...
15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria
Code of Federal Regulations, 2013 CFR
2013-01-01
... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...
15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria
Code of Federal Regulations, 2012 CFR
2012-01-01
... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...
15 CFR Appendix A to Part 946 - National Weather Service Modernization Criteria
Code of Federal Regulations, 2011 CFR
2011-01-01
... specifically in Addendum I, Appendix D of the ASOS Site Component Commissioning Evaluation Package (the ASOS Package). Criteria: a. ASOS Acceptance Test: The site component acceptance test, which includes objective..., has been successfully completed in accordance with item 1a, p. D-2 of Appendix D of the ASOS Package...
NASA's Space Launch System Transitions From Design To Production
NASA Technical Reports Server (NTRS)
Askins, Bruce R.; Robinson, Kimberly F.
2016-01-01
NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.
NASA Technical Reports Server (NTRS)
Greenisen, M. C.; Bishop, P. A.; Sothmann, M.
2008-01-01
The purpose of this study was to determine the consequences of extended periods of weightlessness during space missions on astronauts f ability to perform a simulated contingency egress while wearing either of the Launch and Entry suits immediately after space flight. In our previous lab-based study of simulated contingency egress, we found only 4 of 12 non-astronauts wearing the Launch and Entry Suit (LES) successfully completed the simulated egress. However, 4 of 4 of the previous failures (when tested wearing the LES), were then successful in completing the test wearing the Advanced Crew Escape Suit (ACES). Therefore, this study tested 21 Astronaut Volunteers wearing either the LES or ACES while performing a simulated egress on a treadmill (TM) onboard the Crew Transportation Vehicle immediately after space flight at either the Kennedy Space Center or Edwards AFB. Astronauts walked for 400 meters at 1.6m/sec with g-suit inflation level set to preflight testing levels, visor down, breathing from the suit emergency O2 supply. Metabolic, heartrate, and perceived exertion data were collected during these post-flight tests. Exactly the same preflight simulated egress tests on a TM were performed in the lab at NASA/JSC by each crewmember at L-60. Preflight testing found 2 of the 21 crewmembers were unable to complete the simulated contingency egress. Postflight, 9 crew (8 ACES, 1 LES) completed the simulated contingency egress of 400 meters at 1.6m/sec. and 12 failed to meet that standard (7 ACES, 5 LES). Preflight physiological response tests failed to identify crew capable of performing the egress vs. those who failed. However, 18 of the 21 crew did make at least 2.67 minutes into the postflight egress testing. At that point in time, heartrate was higher (P <=.20) for the failures compared to the finishers. These findings indicate that NASA fs switch to the ACES for space flight crews should be expedited.
Keith, L; Hollar, D
2012-07-01
This study assessed the impact of a pre-medical pipeline program on successful completion of medical school and the capacity of this program to address achievement gaps experienced by disadvantaged students. The University of North Carolina (USA) Medical Education Development (MED) program provides intensive academic and test skills preparation for admission to medical, dental, and other allied health professions schools. This retrospective study evaluated the academic progress of a longitudinal sample of 1738 disadvantaged college students who completed MED between 1974 and 2001. Data sources included MED participant data, medical school admissions data for the host school, aggregate data from the Association of American Medical Colleges (AAMC), and individual MED participant data from AAMC. Methods of analysis utilized Chi-square, independent samples t test, and logistic regression to examine associations between factors. Of the 935 students in MED from 1974 to 2001, who had indicated an interest in medical school, 887 (94.9%) successfully matriculated and 801 (85.7%) successfully earned the MD degree. Using logistic regression, factors that were significantly correlated with earning the medical degree included the student's race, college undergraduate total and science grade point averages, with Hispanic, African American, and Native American participants earning the medical degree at rates comparable to Caucasian participants. MED students successfully earned the MD degree despite having significantly lower Medical College Admissions Test (MCAT) scores and undergraduate grade point averages compared to all United States medical school applicants: MCAT scores had little relationship with student's success. These findings suggest that an intensive, nine-week, pre-medical academic enrichment program that incorporates confidence-building and small-group tutoring and peer support activities can build a foundation on which disadvantaged students can successfully earn matriculation to and graduation from medical school.
Space station propulsion technology
NASA Technical Reports Server (NTRS)
Briley, G. L.
1986-01-01
The progress on the Space Station Propulsion Technology Program is described. The objectives are to provide a demonstration of hydrogen/oxygen propulsion technology readiness for the Initial Operating Capability (IOC) space station application, specifically gaseous hydrogen/oxygen and warm hydrogen thruster concepts, and to establish a means for evolving from the IOC space station propulsion to that required to support and interface with advanced station functions. The evaluation of concepts was completed. The accumulator module of the test bed was completed and, with the microprocessor controller, delivered to NASA-MSFC. An oxygen/hydrogen thruster was modified for use with the test bed and successfully tested at mixture ratios from 4:1 to 8:1.
Pegasus first mission - Flight results
NASA Astrophysics Data System (ADS)
Mosier, Marty; Harris, Gary; Richards, Bob; Rovner, Dan; Carroll, Brent
On April 5, 1990, after release from a B-52 aircraft at 43,198 ft, the three-stage Pegasus solid-propellant rocket successfully completed its maiden flight by injecting its 423-lb payload into a 273 x 370-nmi 94-deg-inclination orbit. The first flight successfully achieved all mission objectives, validating Pegasus's unique air-launched concept, the vehicle's design, and its straightforward ground processing, integration and test methods.
ERIC Educational Resources Information Center
Cáceres-Lorenzo, MTeresa
2015-01-01
The present research aims to identify the factors involved in the successful completion of the "Young Chinese Test" 2-A1 (YCT 2-A1) at Spanish Confucius Institute (Canary Islands). Chinese as a foreign language (CFL) entails several learning difficulties compared with other European languages. This study was conducted on 61 monolingual…
Space Environmental Effects (SEE) Testing Capability: NASA/Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
DeWittBurns, H.; Crave, Paul; Finckenor, Miria; Finchum, Charles; Nehls, Mary; Schneider, Todd; Vaughn, Jason
2012-01-01
Understanding the effects of the space environment on materials and systems is fundamental and essential for mission success. If not properly understood and designed for, the space environment can lead to materials degradation, reduction of functional lifetime, and system failure. Ground based testing is critical in predicting performance NASA/MSFC's expertise and capabilities make up the most complete SEE testing capability available.
Prediction of Lunar- and Martian-Based Intra- and Site-to-Site Task Performance.
Ade, Carl J; Broxterman, Ryan M; Craig, Jesse C; Schlup, Susanna J; Wilcox, Samuel L; Warren, Steve; Kuehl, Phillip; Gude, Dana; Jia, Chen; Barstow, Thomas J
2016-04-01
This study aimed to investigate the feasibility of determining the physiological parameters associated with the ability to complete simulated exploration type tasks at metabolic rates which might be expected for lunar and Martian ambulation. Running V̇O2max and gas exchange threshold (GET) were measured in 21 volunteers. Two simulated extravehicular activity field tests were completed in 1 G in regular athletic apparel at two intensities designed to elicit metabolic rates of ∼20.0 and ∼30.0 ml · kg(-1) · min(-1), which are similar to those previously reported for ambulation in simulated lunar- and Martian-based environments, respectively. All subjects were able to complete the field test at the lunar intensity, but 28% were unable to complete the field test at the Martian intensity (non-Finishers). During the Martian field test there were no differences in V̇O2 between Finishers and non-Finishers, but the non-Finishers achieved a greater %V̇O2max compared to Finishers (78.4 ± 4.6% vs. 64.9 ± 9.6%). Logistic regression analysis revealed fitness thresholds for a predicted probability of 0.5, at which Finishing and non-Finishing are equally likely, and 0.75, at which an individual has a 75% chance of Finishing, to be a V̇O2max of 38.4 ml · kg(-1) · min(-1) and 40.0 ml · kg(-1) · min(-1) or a GET of 20.1 ml · kg(-1) · min(-1) and 25.1 ml · kg(-1) · min(-1), respectively (χ(2) = 10.2). Logistic regression analysis also revealed that the expected %V̇O2max required to complete a field test could be used to successfully predict performance (χ(2) = 19.3). The results of the present investigation highlight the potential utility of V̇O2max, particularly as it relates to the metabolic demands of a surface ambulation, in defining successful completion of planetary-based exploration field tests.
NASA Technical Reports Server (NTRS)
Fasching, W. A.
1979-01-01
The short core exhaust nozzle was evaluated in CF6-50 engine ground tests including performance, acoustic, and endurance tests. The test results verified the performance predictions from scale model tests. The short core exhaust nozzle provides an internal cruise sfc reduction of 0.9 percent without an increase in engine noise. The nozzle hardware successfully completed 1000 flight cycles of endurance testing without any signs of distress.
We expect to successfully install and monitor 3 MFPs, to establish a local fabrication plan for the modification kits, to complete pilot testing of SMS based improved data collection techniques, and to increase jatropha mobilization in 20 farming cooperatives.
Growth motivation as a moderator of behavioral self-handicapping in women.
Brown, Christina M; Park, Sun W; Folger, Susan F
2012-01-01
Behavioral self-handicapping is a strategy used to protect attributions about ability. People behaviorally self-handicap by creating an obstacle to their success so failure is attributed to the obstacle instead of to their ability. Although past research has observed behavioral self-handicapping exclusively in men, the current research revealed a moderator of behavioral self-handicapping in women: growth motivation, which reflects the desire to develop one's abilities and learn from failure. Participants (N = 100) completed a test purportedly predictive of successful careers and relationships, and some were given failure feedback about their performance. Participants could behaviorally self-handicap by choosing to complete another test in a performance-impairing environment. Although men self-handicapped more overall, women self-handicapped more after failure when they were low in growth motivation. These results highlight a novel moderator of behavioral self-handicapping in women.
NASA Technical Reports Server (NTRS)
Dubiel, D. J.; Lohmann, R. P.; Tanrikut, S.; Morris, P. M.
1986-01-01
Under the NASA-sponsored Energy Efficient Engine program, Pratt and Whitney has successfully completed a comprehensive test program using a 90-degree sector combustor rig that featured an advanced two-stage combustor with a succession of advanced segmented liners. Building on the successful characteristics of the first generation counter-parallel Finwall cooled segmented liner, design features of an improved performance metallic segmented liner were substantiated through representative high pressure and temperature testing in a combustor atmosphere. This second generation liner was substantially lighter and lower in cost than the predecessor configuration. The final test in this series provided an evaluation of ceramic composite liner segments in a representative combustor environment. It was demonstrated that the unique properties of ceramic composites, low density, high fracture toughness, and thermal fatigue resistance can be advantageously exploited in high temperature components. Overall, this Combustor Section Rig Test program has provided a firm basis for the design of advanced combustor liners.
Green, Beverly B; Fuller, Sharon; Anderson, Melissa L; Mahoney, Christine; Mendy, Peter; Powell, Susan L
2017-01-01
Multiple randomized controlled trials have demonstrated that mailed fecal testing programs are effective in increasing colorectal cancer screening participation. However, few healthcare organization in the US have Implemented such programs. Stakeholders from one clinic in an integrated healthcare system in Washington State initiated collaboration with researchers with expertise in CRC screening, aiming to increase screening rates at their clinic. Age-eligible individuals who were overdue for CRC screening and had previously completed a fecal test were randomized to receive mailed fecal immunochemical test kits (FIT) at the start of the project (Early) or 6 months later (Late). Outcomes included comparing FIT completion at 6 months by randomization group, and overall CRC screening rates at 12 months. We also assessed implementation facilitators and challenges. Overall 2,421 FIT tests were mailed at a cost of $10,739. At 6 months, FIT completion was significantly higher among the Early compared to the Late group (62% vs.47%, p <0.001). By 12 months, after both groups had received mailings, 71% in each group had completed a FIT. The clinic's overall CRC screening rate was 75.1% at baseline and 78.0% 12 months later. Key constructs associated with successful program implementation included strong stakeholder involvement, use of evidence-based strategies, simplicity, and low cost. Challenges included lack of a plan for maintaining the program. Collaboration between clinic stakeholders and researchers led to a successful project that rapidly increased CRC screening rates. However, institutional normalization of the program would be required to maintain it.
Green, Beverly B.; Fuller, Sharon; Anderson, Melissa L.; Mahoney, Christine; Mendy, Peter; Powell, Susan L.
2017-01-01
Background Multiple randomized controlled trials have demonstrated that mailed fecal testing programs are effective in increasing colorectal cancer screening participation. However, few healthcare organization in the US have Implemented such programs. Methods Stakeholders from one clinic in an integrated healthcare system in Washington State initiated collaboration with researchers with expertise in CRC screening, aiming to increase screening rates at their clinic. Age-eligible individuals who were overdue for CRC screening and had previously completed a fecal test were randomized to receive mailed fecal immunochemical test kits (FIT) at the start of the project (Early) or 6 months later (Late). Outcomes included comparing FIT completion at 6 months by randomization group, and overall CRC screening rates at 12 months. We also assessed implementation facilitators and challenges. Results Overall 2,421 FIT tests were mailed at a cost of $10,739. At 6 months, FIT completion was significantly higher among the Early compared to the Late group (62% vs.47%, p <0.001). By 12 months, after both groups had received mailings, 71% in each group had completed a FIT. The clinic’s overall CRC screening rate was 75.1% at baseline and 78.0% 12 months later. Key constructs associated with successful program implementation included strong stakeholder involvement, use of evidence-based strategies, simplicity, and low cost. Challenges included lack of a plan for maintaining the program. Discussion Collaboration between clinic stakeholders and researchers led to a successful project that rapidly increased CRC screening rates. However, institutional normalization of the program would be required to maintain it. PMID:29399669
Exploring User Learnability and Learning Performance in an App for Depression: Usability Study
Montague, Enid; Lattie, Emily G; Schueller, Stephen M; Kwasny, Mary J; Mohr, David C
2017-01-01
Background Mental health apps tend to be narrow in their functioning, with their focus mostly being on tracking, management, or psychoeducation. It is unclear what capability such apps have to facilitate a change in users, particularly in terms of learning key constructs relating to behavioral interventions. Thought Challenger (CBITs, Chicago) is a skill-building app that engages users in cognitive restructuring, a core component of cognitive therapy (CT) for depression. Objective The purpose of this study was to evaluate the learnability and learning performance of users following initial use of Thought Challenger. Methods Twenty adults completed in-lab usability testing of Thought Challenger, which comprised two interactions with the app. Learnability was measured via completion times, error rates, and psychologist ratings of user entries in the app; learning performance was measured via a test of CT knowledge and skills. Nonparametric tests were conducted to evaluate the difference between individuals with no or mild depression to those with moderate to severe depression, as well as differences in completion times and pre- and posttests. Results Across the two interactions, the majority of completion times were found to be acceptable (5 min or less), with minimal errors (1.2%, 10/840) and successful completion of CT thought records. Furthermore, CT knowledge and skills significantly improved after the initial use of Thought Challenger (P=.009). Conclusions The learning objectives for Thought Challenger during initial uses were successfully met in an evaluation with likely end users. The findings therefore suggest that apps are capable of providing users with opportunities for learning of intervention skills. PMID:28801301
Developments in Science and Technology.
1980-01-01
control. Sucessful completion of the testing and cer- a single unduplicated track file, thereby reducing tification of readiness represents a...Navy shipboard surveillance radar systems Service Corp., is called the single radar performance has been successfully designed, developed, and tested at...for Navy deteciion/disclosure ranges. The single radar per- shipboard surveillance radar systems are reduced by formance prediction system can be
NASA's Space Launch Transitions: From Design to Production
NASA Technical Reports Server (NTRS)
Askins, Bruce; Robinson, Kimberly
2016-01-01
NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.
Alternative Approaches to Mission Control Automation at NASA's Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Rackley, Michael; Cooter, Miranda; Davis, George; Mackey, Jennifer
2001-01-01
To meet its objective of reducing operations costs without incurring a corresponding increase in risk, NASA is seeking new methods to automate mission operations. This paper examines the state of the art in automating ground operations for space missions. A summary of available technologies and methods for automating mission operations is provided. Responses from interviews with several space mission FOTs (Flight Operations Teams) to assess the degree and success of those technologies and methods implemented are presented. Mission operators that were interviewed approached automation using different tools and methods resulting in varying degrees of success - from nearly completely automated to nearly completely manual. Two key criteria for successful automation are the active participation of the FOT in the planning, designing, testing, and implementation of the system and the relative degree of complexity of the mission.
NASA Technical Reports Server (NTRS)
Howard, Richard T.; Bryan, Thomas C.
2007-01-01
The Advanced Video Guidance Sensor (AVGS) was designed to be the proximity operations sensor for the Demonstration of Autonomous Rendezvous Technologies (DART). The DART mission flew in April of2005 and was a partial success. The AVGS did not get the opportunity to operate in every mode in orbit, but those modes in which it did operate were completely successful. This paper will detail the development, testing, and on-orbit performance of the AVGS.
Contractor’s Meeting in Turbulence and Rotating Flows
1999-08-18
pipes under turbine cooling conditions. The research results can be used for the design and fabrication of miniature heat pipes in turbine blades. The...heater used to supply the heat to the evaporator of the heat pipe was successfully fabricated . All experimental tests have been successfully completed...California, Los Angeles; D. Parekh, Georgia Tech Research Institute Rotating Miniature Heat Pipes for Turbine Blade Cooling Applications 37 Y. Cao
ERIC Educational Resources Information Center
Bettinger, Eric; Baker, Rachel
2011-01-01
College completion and college success often lag behind college attendance. One theory as to why students do not succeed in college is that they lack key information about how to be successful or fail to act on the information that they have. We present evidence from a randomized experiment which tests the effectiveness of individualized student…
2017-04-28_B61-12-Program Overview(OUO).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniels, Vonceil
2017-04-01
The B61-12 LEP is currently executing Phase 6.4 Production Engineering with a focus on qualification and preproduction activities. All major milestones have been successfully completed to date. Component Final Design Reviews (FDRs) continue in FY17, with 19 of 38 complete as of April 28. A series of normal and abnormal environments tests occurred in the first half of FY17, and the first qualification flight test on an F-16 was executed in March. Two F-15 qualification flight tests are planned in August. To support Pantex readiness, the first all-up-round (AUR) trainer builds were completed in December 2016. Progress is ongoing towardmore » closure of Air Force Nuclear Weapons Center (tailkit) and Los Alamos National Laboratory interface gaps, and resolution of producibility challenges with the Kansas City National Security Campus (KCNSC).« less
NASA Technical Reports Server (NTRS)
Yim, John T.; Soulas, George C.; Shastry, Rohit; Choi, Maria; Mackey, Jonathan A.; Sarver-Verhey, Timothy R.
2017-01-01
The service life assessment for NASA's Evolutionary Xenon Thruster is updated to incorporate the results from the successful and voluntarily early completion of the 51,184 hour long duration test which demonstrated 918 kg of total xenon throughput. The results of the numerous post-test investigations including destructive interrogations have been assessed against all of the critical known and suspected failure mechanisms to update the life and throughput expectations for each major component. Analysis results of two of the most acute failure mechanisms, namely pit-and-groove erosion and aperture enlargement of the accelerator grid, are not updated in this work but will be published at a future time after analysis completion.
The revised Generalized Expectancy for Success Scale: a validity and reliability study.
Hale, W D; Fiedler, L R; Cochran, C D
1992-07-01
The Generalized Expectancy for Success Scale (GESS; Fibel & Hale, 1978) was revised and assessed for reliability and validity. The revised version was administered to 199 college students along with other conceptually related measures, including the Rosenberg Self-Esteem Scale, the Life Orientation Test, and Rotter's Internal-External Locus of Control Scale. One subsample of students also completed the Eysenck Personality Inventory, while another subsample performed a criterion-related task that involved risk taking. Item analysis yielded 25 items with correlations of .45 or higher with the total score. Results indicated high internal consistency and test-retest reliability.
Track-train dynamic analysis and test program, truck static test
NASA Technical Reports Server (NTRS)
Nemes, A. G.
1974-01-01
A series of tests were conducted to define the characteristics of an ASF 11 Ride Truck Assembly including joint slop, friction and stiffness. Loading to the truck assembly included vertical load to simulate the car/pool loading combined with lateral or moment loading that resulted in desired truck deflections for the various phases of testing. All seven test conditions were successfully completed with load and deflection data being collected. No attempt is made to reduce the applicable data other than to provide computer plots.
Chreiman, Kristen M; Dumas, Ryan P; Seamon, Mark J; Kim, Patrick K; Reilly, Patrick M; Kaplan, Lewis J; Christie, Jason D; Holena, Daniel N
2018-04-01
Quick and successful vascular access in injured patients arriving in extremis is crucial to enable early resuscitation and rapid OR transport for definitive repair. We hypothesized that intraosseous (IO) access would be faster and have higher success rates than peripheral intravenous (PIV) or central venous catheters (CVCs). High-definition video recordings of resuscitations for all patients undergoing emergency department thoracotomy from April 2016 to July 2017 were reviewed as part of a quality improvement initiative. Demographics, mechanism of injury, access type, access location, start and stop time, and success of each vascular access attempt were recorded. Times to completion for access types (PIV, IO, CVC) were compared using Kruskal-Wallis test adjusted for multiple comparisons, while categorical outcomes, such as success rates by access type, were compared using χ test or Fisher's exact test. Study patients had a median age of 30 years (interquartile range [IQR], 25-38 years), 92% were male, 92% were African American, and 93% sustained penetrating trauma. A total of 145 access attempts in 38 patients occurred (median, 3.8; SD, 1.4 attempts per patient). There was no difference between duration of PIV and IO attempts (0.63; IQR, 0.35-0.96 vs. 0.39 IQR, 0.13-0.65 minutes, adjusted p = 0.03), but both PIV and IO were faster than CVC attempts (3.2; IQR, 1.72-5.23 minutes; adjusted p < 0.001 for both comparisons). Intraosseous lines had higher success rates than PIVs or CVCs (95% vs. 42% vs. 46%, p < 0.001). Access attempts using IO are as fast as PIV attempts but are more than twice as likely to be successful. Attempts at CVC access in patients in extremis have high rates of failure and take a median of over 3 minutes. While IO access may not completely supplant PIVs and CVCs, IO access should be considered as a first-line therapy for trauma patients in extremis. Therapeutic, level III.
Instrumentation for Aerosol and Gas Speciation
NASA Technical Reports Server (NTRS)
Coggiola, Michael J.
1998-01-01
Using support from NASA Grant No. NAG 2-963, SRI International successfully completed the project, entitled, 'Instrumentation for Aerosol and Gas Speciation.' This effort (SRI Project 7383) covered the design, fabrication, testing, and deployment of a real-time aerosol speciation instrument in NASA's DC-8 aircraft during the Spring 1996 SUbsonic aircraft: Contrail and Cloud Effects Special Study (SUCCESS) mission. This final technical report describes the pertinent details of the instrument design, its abilities, its deployment during SUCCESS and the data acquired from the mission, and the post-mission calibration, data reduction, and analysis.
Inoue, Masayoshi; Maeda, Hajime; Takeuchi, Yukiyasu; Fukuhara, Kenjiro; Shintani, Yasushi; Funakoshi, Yasunobu; Funaki, Soichiro; Nojiri, Takashi; Kusu, Takashi; Kusumoto, Hidenori; Kimura, Toru; Okumura, Meinoshin
2018-04-01
We conducted a prospective clinical study to individualize adjuvant chemotherapy after complete resection of non-small-cell lung cancer (NSCLC), based on the drug sensitivity test. Patients with resectable c-stage IB-IIIA NSCLC were registered between 2005 and 2010. We performed the collagen gel droplet-embedded culture drug sensitivity test (CD-DST) on a fresh surgical specimen to assess in vitro chemosensitivity and evaluated the prognostic outcome after adjuvant chemotherapy with carboplatin/paclitaxel based on the CD-DST. Among 92 registered patients, 87 were eligible for inclusion in the analysis. The success rate of CD-DST was 86% and chemosensitivity to carboplatin and/or paclitaxel was evident in 57 (76%) of the 75 patients. Adjuvant chemotherapy was completed in 22 (73%) of 30 patients. The 5-year overall survival rates were 71, 73, and 75% for all, CD-DST success, and chemosensitive patients, respectively. The 5-year disease-free survival and overall survival rates of the chemosensitive patients who completed adjuvant chemotherapy using carboplatin/paclitaxel were 68 and 82%, respectively. The 5-year disease-free survival and overall survival rates of the patients with stage II-IIIA chemosensitive NSCLC were 58 and 75%, respectively. Comparative analyses of the chemosensitive and non-chemosensitive/CD-DST failure groups showed no significant survival difference. CD-DST can be used to evaluate chemosensitivity after lung cancer surgery; however, its clinical efficacy for assessing individualized treatment remains uncertain.
2017-12-08
A liquid oxygen test tank was completed in the Prototype Development Laboratory at NASA's Kennedy Space Center in Florida. A banner signing event marked the successful delivery of the tank called Tardis. Engineers and technicians worked together to develop the tank and build it at the lab to support cryogenic testing at Johnson Space Center's White Sands Test Facility in Las Cruces, New Mexico. The 12-foot-tall, 3,810-pound aluminum tank will be shipped to White Sands for testing.
22 CFR 62.32 - Summer work travel.
Code of Federal Regulations, 2014 CFR
2014-04-01
... studies at accredited post-secondary, classroom-based, academic institutions physically located outside of the United States and have successfully completed at least one semester, or equivalent, of post... comprehension through either recognized language tests administered by academic institutions or English language...
22 CFR 62.32 - Summer work travel.
Code of Federal Regulations, 2013 CFR
2013-04-01
... studies at accredited post-secondary, classroom-based, academic institutions physically located outside of the United States and have successfully completed at least one semester, or equivalent, of post... comprehension through either recognized language tests administered by academic institutions or English language...
NASA Technical Reports Server (NTRS)
Park, Sang C.; Brinckerhoff, Pamela; Franck, Randy; Schweickart, Rusty; Thomson, Shaun; Burt, Bill; Ousley, Wes
2016-01-01
The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.
The Missing Link: Community-Based Organization Participation in ESL/Civics Classes.
ERIC Educational Resources Information Center
Medrani, Emelda
This memorandum discusses the need for civics and English-as-a-Second-Language (ESL) instruction as a result of the Immigration Reform and Control Act (IRCA) of 1986. IRCA provides an opportunity for illegal aliens to obtain legal resident status by successfully completing a test of English proficiency and a test of U.S. history and government, or…
ERIC Educational Resources Information Center
Francis, Charles E.
In this study, a pencil paper performance test (PPPT) was developed and administered to an experimental group of 46 students and a control group of 48 students to determine: (1) the difference between laboratory performance and the successful completion of a laboratory course in electricity, (2) the relationship between laboratory performance as…
Test Results of the RS-44 Integrated Component Evaluator Liquid Oxygen/Hydrogen Rocket Engine
NASA Technical Reports Server (NTRS)
Sutton, R. F.; Lariviere, B. W.
1993-01-01
An advanced LOX/LH2 expander cycle rocket engine, producing 15,000 lbf thrust for Orbital Transfer Vehicle missions, was tested to determine ignition, transition, and main stage characteristics. Detail design and fabrication of the pump fed RS44 integrated component evaluator (ICE) was accomplished using company discretionary resources and was tested under this contracted effort. Successful demonstrations were completed to about the 50 percent fuel turbopump power level (87,000 RPM), but during this last test, a high pressure fuel turbopump (HPFTP) bearing failed curtailing the test program. No other hardware were affected by the HPFTP premature shutdown. The ICE operations matched well with the predicted start transient simulations. The tests demonstrated the feasibility of a high performance advanced expander cycle engine. All engine components operated nominally, except for the HPFTP, during the engine hot-fire tests. A failure investigation was completed using company discretionary resources.
Neuroprosthetics and Solutions for Restoring Sensorimotor Functions
2009-01-01
in the stab wound control (A, C) and the 1-week implantation of the electrode (B, D). Striking neurofilament loss occurred surrounding both the stab...force. (Like in heel strike and toe of in normal gait cycle). (B) The Proof Test is a static test for foot ankle unit in which maximum load is...applied on heel and forefoot in one single time successively. Project 1. Develop a somatosensory neural interface (SSNI) -Completed pilot testing of
Crew report. [on Skylab altitude simulation tests
NASA Technical Reports Server (NTRS)
Bobko, K. J.; Crippen, R. L.; Thornton, W. E.
1973-01-01
A 56-day chamber simulation of Skylab was successfully completed. The atmosphere (5 psi, 70 percent oxygen, 30 percent nitrogen, 5 mm carbon dioxide) and medical features including a 21-day pre- and 18-day post-test medical protocols were closely simulated. No apparent crew health problems were induced by the atmosphere, semiclosed environment, or other test features; and no appreciable crew degradation appeared over this period. The chamber and associated systems performed without major problems.
Bigi, Sandra; Marrie, R A; Till, C; Yeh, E A; Akbar, N; Feinstein, A; Banwell, B L
2017-04-01
Decreased information processing speed (IPS) is frequently reported in pediatric multiple sclerosis (MS) patients. The computerized version of the Symbol Digit Modalities Test (c-SDMT) measures IPS over eight consecutive trials per session and additionally captures changes in performance within the session. Here, we establish normative c-SDMT performance and test-retest reliability in healthy children (HC) and explore differences in the overall c-SDMT-performance between HC and MS patients. This cross-sectional study included 478 HC (237 female, 49.5%) divided into five age groups (2 years each), and 27 MS patients (22 female, 81.5%) aged 8-18 years. The average time to complete the c-SDMT increased with age (|r| 0.70, 95% CI -0.74, -0.64). Test-retest reliability was high (ICC = 0.91) in HC. The total time to complete the c-SDMT did not differ between children with MS and sex- and age- matched HC (p = 0.23). However, MS patients were less likely to show faster performance across all the successive eight trials compared to HC (p = 0.0001). Healthy children demonstrate faster IPS with increasing age, as well as during successive trials of the c-SDMT. The inability of pediatric MS patients to maintain the increase in processing speed over successive trials suggests a reduced capacity for procedural learning, possibly resulting from cognitive fatigue.
Return to flight SSME test at A2 test stand
2004-07-16
The Space Shuttle Main Engine (SSME) reached a historic milestone July 16, 2004, when a successful flight acceptance test was conducted at NASA Stennis Space Center (SSC). The engine tested today is the first complete engine to be tested and shipped in its entirety to Kennedy Space Center for installation on Space Shuttle Discovery for STS-114, NASA's Return to Flight mission. The engine test, which began about 3:59 p.m. CDT, ran for 520 seconds (8 minutes), the length of time it takes for the Space Shuttle to reach orbit.
Hewer, Raymond; Motaung, Enea; Mathope, Alicia; Meyer, Debra
2005-05-01
In order for HIV voluntary counselling and testing (VCT) to be successful, the approval of and attendance at the VCT centre by the community it serves is necessary. To this end, the Township AIDS Project (TAP), which has VCT sites serving the greater Soweto area, attempts to maintain a high degree of visibility in the community through campaigning and various forms of advertising. To determine whether the social marketing strategies employed by the organisation encouraged attendance, pre-test questionnaires completed by volunteers attending the TAP VCT site located in the Meadowlands district of Soweto were retrospectively analysed. During 2003, approximately 34% of volunteers were made aware of the VCT site through marketing. However, a more important factor in volunteer awareness was word of mouth, with about 46% of volunteers informed of TAP VCT by a friend, partner or relative. This attests to the success of the marketing strategies employed by the TAP organisation in raising community awareness and attendance at the VCT site investigated in this study. In total, 1 141 volunteers completed a questionnaire and 1 054 of these consented to being tested for HIV antibodies. The level of infection among the sample of individuals tested at this clinic-based VCT programme was 29.9%.
Flight Testing the X-36: The Test Pilots Perspective
NASA Technical Reports Server (NTRS)
Walker, Laurence A.
1997-01-01
The X-36 is a 28% scale, remotely piloted research aircraft, designed to demonstrate tailless fighter agility. Powered by a modified Williams International F-112 jet engine, the X-36 uses thrust vectoring and a fly-by-wire control system. Although too small for an onboard pilot, a full-sized remote cockpit was designed to virtually place the test pilot into the aircraft using a variety of innovative techniques. To date, 22 flights have been flown, successfully completing the second phase of testing. Handling qualities have been matching predictions; the test operation is flown similarly to that for full sized manned aircraft. All takeoffs, test maneuvers and landings are flown by the test pilot, affording a greater degree of flexibility and the ability to handle the inevitable unknowns which may occur during highly experimental test programs. The cockpit environment, cues, and display techniques used in this effort have proven to enhance the 'virtual' test pilot's awareness and have helped ensure a successful RPV test program.
Peters, Erica N; Hendricks, Peter S; Clark, C Brendan; Vocci, Frank J; Cropsey, Karen L
2014-01-01
African American youth who use marijuana are less likely to attend and complete treatment than white youth. Limited information is available on racial and age variation in treatment attendance and completion among adults who use marijuana. The current research examined differences in community-based substance abuse treatment attendance and completion between adult African American and white marijuana users in 2 independent samples from the US southeastern (N = 160; 70.6% African American) and mid-Atlantic (N = 450; 34.7% African American) regions. Attended at least 3 treatment sessions, successful treatment completion, number of days in treatment, and percentage of positive urine drug screens. Adjusted regression models examined the association of race, age, and the interaction of race and age with treatment attendance and completion. In the southeastern sample, successful treatment completion was significantly associated with the interaction of race and age (adjusted odds ratio = 1.35, 95% confidence interval = 1.08-1.69); whereas younger African Americans were less likely to complete treatment than older African Americans, age was unrelated to treatment completion among whites. In the mid-Atlantic sample, African Americans were significantly less likely to attend at least 3 treatment sessions (adjusted odds ratio = 0.37, 95% confidence interval = 0.23-0.58), and younger adult marijuana users were retained for fewer days in treatment (adjusted β = 0.13, 95% confidence interval = 0.27-2.48). Among African Americans, 37.9% (SD = 38.0) of urine drug screens tested positive for at least 1 illicit drug, and among whites, 34.2% (SD = 37.8%) tested positive; the percentage of positive urine drug screens was not associated with race or age. Among marijuana-using adults, treatment attendance and completion differ by race and age, and improvements in treatment completion may occur as some African Americans mature out of young adulthood.
NASA Technical Reports Server (NTRS)
Hagood, J. T.
1973-01-01
Acceptance tests were conducted at Kennedy Space Center of the Saturn Vehicle Workshop Spacecraft Access Arm and related equipment. The tests were conducted to prove complete system capability to operate satisfactorily under conditions required to support spacecraft operations and activities. The SVWS Access Arm, serial number AA-09-03, is a Command Module Service Arm, S/A 9, which was removed from the mobile launcher and modified to support the SVWS operations. The C/M environmental chamber was removed and a completely new chamber was installed. The retract system was redesigned to remove the automatic/remote control capability and replaced with a local manual control. The SVWS Access Arm System was successfully tested and supported spacecraft processing without major problems.
Mihata, Teruhisa; Bui, Christopher N H; Akeda, Masaki; Cavagnaro, Matthew A; Kuenzler, Michael; Peterson, Alexander B; McGarry, Michelle H; Itami, Yasuo; Limpisvasti, Orr; Neo, Masashi; Lee, Thay Q
2017-12-01
Biomechanical and clinical success of the superior capsule reconstruction (SCR) using fascia lata (FL) grafts has been reported. In the United States, human dermal (HD) allograft has been used successfully for SCRs; however, the biomechanical characteristics have not been reported. Eight cadaveric shoulders were tested in 5 conditions: (1) intact; (2) irreparable supraspinatus tear; (3) SCR using FL allograft with anterior and posterior suturing; (4) SCR using HD allograft with anterior and posterior suturing; and (5) SCR using HD allograft with posterior suturing. Rotational range of motion, superior translation, glenohumeral joint force, and subacromial contact were measured at 0°, 30°, and 60° of glenohumeral abduction in the scapular plane. Graft dimensions before and after testing were also recorded. Biomechanical parameters were compared using a repeated-measures analysis of variance with Tukey post hoc test, and graft dimensions were compared using a Student t-test (P < .05). Irreparable supraspinatus tear significantly increased superior translation, superior glenohumeral joint force, and subacromial contact pressure, which were completely restored with the SCR FL allografts. Both SCR HD allograft repairs partially restored superior translation and completely restored subacromial contact and superior glenohumeral joint force. The HD allografts significantly elongated by 15% during testing, whereas the FL allograft lengths were unchanged. Single-layered HD SCR allografts partially restored superior glenohumeral stability, whereas FL allograft SCR completely restored the superior glenohumeral stability. This may be due to the greater flexibility of the HD allograft, and the SCR procedure used was developed on the basis of FL grafts. Published by Elsevier Inc.
NASA's Webb "Pathfinder Telescope" Successfully Completes First Super-Cold Optical Test
2017-12-08
Testing is crucial part of NASA's success on Earth and in space. So, as the actual flight components of NASA's James Webb Space Telescope come together, engineers are testing the non-flight equipment to ensure that tests on the real Webb telescope later goes safely and according to plan. Recently, the "pathfinder telescope," or just “Pathfinder,” completed its first super-cold optical test that resulted in many first-of-a-kind demonstrations. "This test is the first dry-run of the equipment and procedures we will use to conduct an end-to-end optical test of the flight telescope and instruments," said Mark Clampin, Webb telescope Observatory Project Scientist at NASA's Goddard Space Flight Center in Greenbelt, Maryland. "It provides confidence that once the flight telescope is ready, we are fully prepared for a successful test of the flight hardware." The Pathfinder is a non-flight replica of the Webb telescope’s center section backplane, or “backbone,” that includes mirrors. The flight backplane comes in three segments, a center section and two wing-like parts, all of which will support large hexagonal mirrors on the Webb telescope. The pathfinder only consists of the center part of the backplane. However, during the test, it held two full size spare primary mirror segments and a full size spare secondary mirror to demonstrate the ability to optically test and align the telescope at the planned operating temperatures of -400 degrees Fahrenheit (-240 Celsius). Read more: www.nasa.gov/feature/goddard/nasas-webb-pathfinder-telesc... Credit: NASA/Goddard/Chris Gunn NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
A high power ion thruster for deep space missions
NASA Astrophysics Data System (ADS)
Polk, James E.; Goebel, Dan M.; Snyder, John S.; Schneider, Analyn C.; Johnson, Lee K.; Sengupta, Anita
2012-07-01
The Nuclear Electric Xenon Ion System ion thruster was developed for potential outer planet robotic missions using nuclear electric propulsion (NEP). This engine was designed to operate at power levels ranging from 13 to 28 kW at specific impulses of 6000-8500 s and for burn times of up to 10 years. State-of-the-art performance and life assessment tools were used to design the thruster, which featured 57-cm-diameter carbon-carbon composite grids operating at voltages of 3.5-6.5 kV. Preliminary validation of the thruster performance was accomplished with a laboratory model thruster, while in parallel, a flight-like development model (DM) thruster was completed and two DM thrusters fabricated. The first thruster completed full performance testing and a 2000-h wear test. The second successfully completed vibration tests at the full protoflight levels defined for this NEP program and then passed performance validation testing. The thruster design, performance, and the experimental validation of the design tools are discussed in this paper.
A high power ion thruster for deep space missions.
Polk, James E; Goebel, Dan M; Snyder, John S; Schneider, Analyn C; Johnson, Lee K; Sengupta, Anita
2012-07-01
The Nuclear Electric Xenon Ion System ion thruster was developed for potential outer planet robotic missions using nuclear electric propulsion (NEP). This engine was designed to operate at power levels ranging from 13 to 28 kW at specific impulses of 6000-8500 s and for burn times of up to 10 years. State-of-the-art performance and life assessment tools were used to design the thruster, which featured 57-cm-diameter carbon-carbon composite grids operating at voltages of 3.5-6.5 kV. Preliminary validation of the thruster performance was accomplished with a laboratory model thruster, while in parallel, a flight-like development model (DM) thruster was completed and two DM thrusters fabricated. The first thruster completed full performance testing and a 2000-h wear test. The second successfully completed vibration tests at the full protoflight levels defined for this NEP program and then passed performance validation testing. The thruster design, performance, and the experimental validation of the design tools are discussed in this paper.
Magma Energy Research, 79-1. Semiannual report, October 1, 1978-March 31, 1979
DOE Office of Scientific and Technical Information (OSTI.GOV)
Traeger, R.K.; Colp, J.L.; Neel, R.R.
1979-07-01
A major effort in evaluating Kilauea Iki lava lake has been completed. The physical model based on FY 76 geophysical experiments is not correct in that a low viscosity, liquid lens of appreciable thickness does not exist. Mathematical models of the cooling of the lava lake and the state of solidification of the liquid lens were verified by thermal profile and permeability measurements. New jet-augmented drilling concepts successfully penetrated the viscous, multi-phase molten rock region in some locations where conventional drilling failed. Heat transfer studies in the lake suggest injection of fluids to enhance convection may be useful to extractmore » energy from magma chamber margins. Other activities resulted in the completion and successful testing of a 800 cc simulation facility for evaluating simulated magma properties at temperatures to 1500/sup 0/C and pressures to 4 kbar. In materials compatibility studies, thermodynamic stability diagrams were developed for 15 pure metals in basaltic magma systems and compatibility tests completed. Results are being used to define simple alloy systems which may be compatible with magmas and to identify other superalloy materials candidates.« less
Tokunaga, Hironobu; Ando, Hirotaka; Obika, Mikako; Miyoshi, Tomoko; Tokuda, Yasuharu; Bautista, Miho; Kataoka, Hitomi; Terasawa, Hidekazu
2014-01-01
Objectives We report the preliminary development of a unique Web-based instrument for assessing and teaching knowledge and developing clinical thinking called the “Sequential Questions and Answers” (SQA) test. Included in this feasibility report are physicians’ answers to the Sequential Questions and Answers pre- and posttests and their brief questionnaire replies. Methods The authors refined the SQA test case scenario for content, ease of modifications of case scenarios, test uploading and answer retrieval. Eleven geographically distant physicians evaluated the SQA test, taking the pretest and posttest within two weeks. These physicians completed a brief questionnaire about the SQA test. Results Eleven physicians completed the SQA pre- and posttest; all answers were downloaded for analysis. They reported the ease of website login and navigating within the test module together with many helpful suggestions. Their average posttest score gain was 53% (p=0.012). Conclusions We report the successful launch of a unique Web-based instrument referred to as the Sequential Questions and Answers test. This distinctive test combines teaching organization of the clinical narrative into an assessment tool that promotes acquiring medical knowledge and clinical thinking. We successfully demonstrated the feasibility of geographically distant physicians to access the SQA instrument. The physicians’ helpful suggestions will be added to future SQA test versions. Medical schools might explore the integration of this multi-language-capable SQA assessment and teaching instrument into their undergraduate medical curriculum. PMID:25341203
Two-axis antenna positioning mechanism
NASA Technical Reports Server (NTRS)
Herald, Michelle; Wai, Leilani C.
1994-01-01
The two-axis antenna positioning mechanism (TAAPM) is used to position three Ku-band and one C-band spot antennas on the INTELSAT 7 (I-7) spacecraft, which is a commercial telecommunications satellite purchased and operated by INTELSAT, an international consortium. The first I-7 was successfully launched on 22 Oct. 1993 from French Guiana on an Ariane launch vehicle. The TAAPM's on the first I-7 satellite successfully completed their in-orbit functional testing. The TAAPM was an entirely new design for Space Systems/Loral. This paper will describe the spacecraft/system requirements and application of the TAAPM and present the technical findings of TAAPM qualification and protoflight testing.
Visual field defects may not affect safe driving.
Dow, Jamie
2011-10-01
In Quebec a driver whose acquired visual field defect renders them ineligible for a driver's permit renewal may request an exemption from the visual field standard by demonstrating safe driving despite the defect. For safety reasons it was decided to attempt to identify predictors of failure on the road test in order to avoid placing driving evaluators in potentially dangerous situations when evaluating drivers with visual field defects. During a 4-month period in 2009 all requests for exemptions from the visual field standard were collected and analyzed. All available medical and visual field data were collated for 103 individuals, of whom 91 successfully completed the evaluation process and obtained a waiver. The collated data included age, sex, type of visual field defect, visual field characteristics, and concomitant medical problems. No single factor, or combination of factors, could predict failure of the road test. All 5 failures of the road test had cognitive problems but 6 of the successful drivers also had known cognitive problems. Thus, cognitive problems influence the risk of failure but do not predict certain failure. Most of the applicants for an exemption were able to complete the evaluation process successfully, thereby demonstrating safe driving despite their handicap. Consequently, jurisdictions that have visual field standards for their driving permit should implement procedures to evaluate drivers with visual field defects that render them unable to meet the standard but who wish to continue driving.
Isaac Newton and Student College Completion
ERIC Educational Resources Information Center
Tinto, Vincent
2013-01-01
Success in college is built upon classroom success, but success in the classroom does not in itself ensure college completion. Completion arises from success in a sequence of classes one after another over time. It does so most frequently when students are presented with coherent course pathways to degree completion, are able to gain degree credit…
Jameson, Jason; Pappa, Leon; McGuire, Brian; Kelly, Karen R
2015-01-01
For decades women have been restricted from direct assignment to certain military occupational specialties such as infantry. These restrictions can limit the advancement of women through the ranks of military leadership. Thus, the purpose of this effort was to identify those physical requirements most likely to serve as barriers for women wanting to enter closed combat arms positions, and to evaluate the quality of existing physical fitness tests as potential measures of assessment of combat readiness. Data were collected from 3 different sites within the US Marine Corps Training and Education Command. All participants (409 male, 379 femaile) were active-duty Marines who recently completed the Physical Fitness Test (PFT) and Combat Fitness Test (CFT). Participants completed 6 physical tasks: 120-mm tank loading drill, 155-mm artillery round carry, negotiating an obstacle course wall while wearing a fighting load (≈30 lb), pull-ups, deadlift, and clean and press. Overall, there was a high rate of successful completion on the combat proxy tasks (men, ≈80% to 100%; women, ≈70% to 100%), with the notable exception being the clean and press (men, 80%; women, 9%) and pull-ups (men, 16±4; women, 4±2). The PFT and CFT components tasks were also related, strongly in some cases, with performance on combat-related proxy tasks (Spearman's ρ typically ranged from 0.60 to 0.80). Estimates of fat-free mass and VO2max were also strongly related to an overall measure of combat readiness (Spearman's ρ=0.77 and ρ=0.56, respectively). The primary physical obstacle for women is upper body strength. However, some women could successfully complete all of the proxy tasks and thus are physically capable of meeting the demands of closed combat occupations. The fact that some female Marines could complete the most challenging upper body strength tasks suggests that these barriers are not inherent but may be due to a lack of training specificity.
ERIC Educational Resources Information Center
Nielson, David E.; George, James D.; Vehrs, Pat R.; Hager, Ron L.; Webb, Carrie V.
2010-01-01
The purpose of this study was to develop a multiple linear regression model to predict treadmill VO[subscript 2max] scores using both exercise and non-exercise data. One hundred five college-aged participants (53 male, 52 female) successfully completed a submaximal cycle ergometer test and a maximal graded exercise test on a motorized treadmill.…
2017-08-30
NASA Acting Deputy Chief Technologist Vicki Crisp discusses Sierra Nevada Corporation’s Dream Chaser captive carry flight and future tests with former Astronaut Lee "Bru" Archambault, who is now a test pilot for the American company. The Dream Chaser completed a successful captive carry flight at NASA’s Armstrong Flight Research Center at Edwards, California, on Aug. 30, 2017.
Lessons Learned During Instrument Testing for the Thermal Infrared Sensor (TIRS)
NASA Technical Reports Server (NTRS)
Peabody, Hume L.; Otero, Veronica; Neuberger, David
2013-01-01
The Themal InfraRed Sensor (TIRS) instrument, set to launch on the Landsat Data Continuity Mission in 2013, features a passively cooled telescope and IR detectors which are actively cooled by a two stage cryocooler. In order to proceed to the instrument level test campaign, at least one full functional test was required, necessitating a thermal vacuum test to sufficiently cool the detectors and demonstrate performance. This was fairly unique in that this test occurred before the Pre Environmental Review, but yielded significant knowledge gains before the planned instrument level test. During the pre-PER test, numerous discrepancies were found between the model and the actual hardware, which were revealed by poor correlation between model predictions and test data. With the inclusion of pseudo-balance points, the test also provided an opportunity to perform a pre-correlation to test data prior to the instrument level test campaign. Various lessons were learned during this test related to modeling and design of both the flight hardware and the Ground Support Equipment and test setup. The lessons learned in the pre-PER test resulted in a better test setup for the nstrument level test and the completion of the final instrument model correlation in a shorter period of time. Upon completion of the correlation, the flight predictions were generated including the full suite of off-nominal cases, including some new cases defined by the spacecraft. For some of these ·new cases, some components now revealed limit exceedances, in particular for a portion of the hardware that could not be tested due to its size and chamber limitations.. Further lessons were learned during the completion of flight predictions. With a correlated detalled instrument model, significant efforts were made to generate a reduced model suitable for observatory level analyses. This proved a major effort both to generate an appropriate network as well as to convert to the final model to the required format and yielded additional lessons learned. In spite of all the challenges encountered by TIRS, the instrument was successfully delivered to the spacecraft and will soon be tested at observatory level in preparation for a successful mission launch.
Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2005-01-01
The primary objective of this effort is to demonstrate and validate alternatives to aliphatic isocyanate polyurethanes. Successful completion of this project will result in one or more isocyanate-free coatings qualified for use at AFSPC and NASA installations participating in this project.
Integrating Online Discussion in an Australian Intensive English Language Course.
ERIC Educational Resources Information Center
Sutherland-Smith, Wendy
2002-01-01
Describes how the Internet was used for online interaction in a 10-week English-as-a-Second-Language course. Students were highly motivated and seeking eventual admittance to undergraduate programs through successful completion of International English language Testing System (IELTS) examinations. (Author/VWL)
Operation minute gun, shot Diana Moon. Summary report. (Sanitized version)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bower, J.A.B.; Nance, O.A.
1973-12-31
Typical device diagnostic experiments such as filter fluorescers, a calorimeter, a pinhole camera, a bent crystal spectrometer, and passive dosimetry were also present on Diana Moon. The test was considered a complete success with over 95 percent of the experimental data being recovered.
ERIC Educational Resources Information Center
Mastin, David F.; Peszka, Jennifer; Lilly, Deborah R.
2009-01-01
Psychology students completed a task with reinforcement for successful performance. We tested academic integrity under randomly assigned conditions of check mark acknowledgment of an honor pledge, typed honor pledge, or no pledge. Across all conditions, 14.1% of students inflated their self-reported performance (i.e., cheated). We found no…
High Pressure Earth Storable Rocket Technology Program-Hipes Options 1/2 Report
NASA Technical Reports Server (NTRS)
Chazen, M. L.; Sicher, D.; Calvignac, J.; Ono, D.
1999-01-01
Under the High Pressure Earth Storable Rocket Technology (HIPES) Program, TRW successfully completed testing of two 100 lbf thrust class rhenium chambers using N204-MMH. The first chamber was successfully fired for 4789 seconds of operating time with a maximum duration of 700 seconds. This chamber had been previously fired for 5230 seconds with N2O4-N2H4. The second chamber was successfully fired for 8085 seconds with a maximum firing duration of 1200 seconds. The Isp (specific impulse) for both chambers ranged from 323 lbf-sec/lbm to 330 lbf-sec/lbm.
SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 1
NASA Technical Reports Server (NTRS)
Baker, William H., Jr.
1986-01-01
A preliminary design and analysis was completed for a SLEEC (Shingle Lap Extendible Exit Cone) which could be incorporated on the Space Transportation System (STS) Solid Rocket Booster (SRB). Studies were completed which predicted weights and performance increases and development plans were prepared for the full-scale bench and static test of SLEEC. In conjunction with the design studies, a series of supporting analyses were performed to assure the validity and feasibility of performance, fabrication, cost, and reliability for the selected design. The feasibility and required amounts of bench, static firing, and flight tests considered necessary for the successful incorporation of SLEEC on the Shuttle SRBs were determined. Preliminary plans were completed which define both a follow on study effort and a development program.
Ongoing Recovery Basic Information Tool (ORBIT)
NASA Technical Reports Server (NTRS)
Oberg, Donald
1993-01-01
The Federal Drug Free Work Place Program (DFWP) has now matured to the point of being able to return employees to sensitive testing designated positions (TDP) after completion of treatment of their addiction. The known tendency of addicted individuals to suffer multiple relapses prior to their final recovery has resulted in several positive urine tests (relapses) occurring among those Federal employees who have already completed treatment and who have been returned to TDP's. The very real potential for further relapses occurring after additional employees return to TDP's will be a critical factor in the ultimate success of the DFWP and in the public's impression of the program's effectiveness. In response to this concern, NASA has begun development of its Ongoing Recovery Basic Information Tool (ORBIT) instrument. The aim of the NASA ORBIT is to provide Employee Assistance Program (EAP) professionals with an advanced clinical tool which will be helpful in supporting recovery from substance abuse and which will allow more accurate determinations of when clients may be successfully returned to sensitive positions.
Replacement Non-Toxic Sealants for Standard Chromated Sealants
2005-02-01
material’s mechanical or physical properties and resistance to degradation. As sealant formulations for the Class B-2 worklife were developed by PRC...results ofthis testing, Class B-1I2 and C-12 worklife materials were formulated and are being tested. In addition to the testing that UDRI conducted, two...successfully accomplished in this program. An optimized Class B-2 worklife of the sealant compound designated RW3758-71, Lot no. RT0946, completed
2015-10-16
NASA is developing the next generation of heat shield to enable astronauts to go to Mars and other deep space destinations. Called the Adaptive Deployable Entry and Placement Technology or ADEPT, the heat shield is mechanically deployable and uses a flexible woven carbon fabric as its skin. Recently, engineers successfully completed a series of tests in the Ames Arc Jet facility. Other tests conducted in wind tunnels at Ames demonstrated that the ADEPT materials and system perform well under planetary re-entry conditions.
Male dominance rank and reproductive success in chimpanzees, Pan troglodytes schweinfurthii.
Wroblewski, Emily E; Murray, Carson M; Keele, Brandon F; Schumacher-Stankey, Joann C; Hahn, Beatrice H; Pusey, Anne E
2009-01-01
Competition for fertile females determines male reproductive success in many species. The priority of access model predicts that male dominance rank determines access to females, but this model has been difficult to test in wild populations, particularly in promiscuous mating systems. Tests of the model have produced variable results, probably because of the differing socioecological circumstances of individual species and populations. We tested the predictions of the priority of access model in the chimpanzees of Gombe National Park, Tanzania. Chimpanzees are an interesting species in which to test the model because of their fission-fusion grouping patterns, promiscuous mating system and alternative male mating strategies. We determined paternity for 34 offspring over a 22-year period and found that the priority of access model was generally predictive of male reproductive success. However, we found that younger males had higher success per male than older males, and low-ranking males sired more offspring than predicted. Low-ranking males sired offspring with younger, less desirable females and by engaging in consortships more often than high-ranking fathers. Although alpha males never sired offspring with related females, inbreeding avoidance of high-ranking male relatives did not completely explain the success of low-ranking males. While our work confirms that male rank typically predicts male chimpanzee reproductive success, other factors are also important; mate choice and alternative male strategies can give low-ranking males access to females more often than would be predicted by the model. Furthermore, the success of younger males suggests that they are more successful in sperm competition.
Internet skills performance tests: are people ready for eHealth?
van Deursen, Alexander J A M; van Dijk, Jan A G M
2011-04-29
Despite the amount of online health information, there are several barriers that limit the Internet's adoption as a source of health information. One of these barriers is highlighted in conceptualizations of the digital divide which include the differential possession of Internet skills, or "eHealth literacy". Most measures of Internet skills among populations at large use self-assessments. The research discussed here applies a multifaceted definition of Internet skills and uses actual performance tests. The purpose of this study was to assess how ready a sample of the general population is for eHealth. More specifically, four types of Internet skills were measured in a performance test in which subjects had to complete health-related assignments on the Internet. From November 1, 2009, through February 28, 2010, 88 subjects participated in the study. Subjects were randomly selected from a telephone directory. A selective quota sample was used divided over equal subsamples of gender, age, and education. Each subject had to accomplish assignments on the Internet. The Internet skills accounted for were categorized as operational (basic skills to use the Internet), formal (navigation and orientation), information (finding information), and strategic (using the information for personal benefits). The tests took approximately 1.5 hours and were conducted in a University office, making the setting equally new for all. Successful completion and time spent on the assignments-the two main outcomes-were directly measured by the test leader. The subjects successfully completed an average of 73% (5.8/8) of the operational Internet skill tasks and an average of 73% (2.9/4) of the formal Internet skill tasks. Of the information Internet skills tasks, an average of 50% (1.5/3) was completed successfully and, of the strategic Internet skills tasks, 35% (0.7/2). Only 28% (25/88) of the subjects were able to successfully complete all operational skills tasks, 39% (34/88), all formal skills tasks, 13% (11/88), all information skills tasks, and 20% (18/88), both the strategic skill tasks. The time spent on the assignments varied substantially. Age and education were the most important contributors to the operational and formal Internet skills. Regarding the formal Internet skills, years of Internet experience also had some influence. Educational level of attainment was the most important contributor to the information and strategic Internet skills. Although the amount of online health-related information and services is consistently growing, it appears that the general population lacks the skills to keep up. Most problematic appear to be the lack of information and strategic Internet skills, which, in the context of health, are very important. The lack of these skills is also problematic for members of younger generations, who are often considered skilled Internet users. This primarily seems to account for the operational and formal Internet skills. The results of the study strongly call for policies to increase the level of Internet skills.
Internet Skills Performance Tests: Are People Ready for eHealth?
van Dijk, Jan A G M
2011-01-01
Background Despite the amount of online health information, there are several barriers that limit the Internet’s adoption as a source of health information. One of these barriers is highlighted in conceptualizations of the digital divide which include the differential possession of Internet skills, or “eHealth literacy”. Most measures of Internet skills among populations at large use self-assessments. The research discussed here applies a multifaceted definition of Internet skills and uses actual performance tests. Objective The purpose of this study was to assess how ready a sample of the general population is for eHealth. More specifically, four types of Internet skills were measured in a performance test in which subjects had to complete health-related assignments on the Internet. Methods From November 1, 2009, through February 28, 2010, 88 subjects participated in the study. Subjects were randomly selected from a telephone directory. A selective quota sample was used divided over equal subsamples of gender, age, and education. Each subject had to accomplish assignments on the Internet. The Internet skills accounted for were categorized as operational (basic skills to use the Internet), formal (navigation and orientation), information (finding information), and strategic (using the information for personal benefits). The tests took approximately 1.5 hours and were conducted in a University office, making the setting equally new for all. Successful completion and time spent on the assignments—the two main outcomes—were directly measured by the test leader. Results The subjects successfully completed an average of 73% (5.8/8) of the operational Internet skill tasks and an average of 73% (2.9/4) of the formal Internet skill tasks. Of the information Internet skills tasks, an average of 50% (1.5/3) was completed successfully and, of the strategic Internet skills tasks, 35% (0.7/2). Only 28% (25/88) of the subjects were able to successfully complete all operational skills tasks, 39% (34/88) all formal skills tasks, 13% (11/88) all information skills tasks, and 20% (18/88) both the strategic skill tasks. The time spent on the assignments varied substantially. Age and education were the most important contributors to the operational and formal Internet skills. Regarding the formal Internet skills, years of Internet experience also had some influence. Educational level of attainment was the most important contributor to the information and strategic Internet skills. Conclusions Although the amount of online health-related information and services is consistently growing, it appears that the general population lacks the skills to keep up. Most problematic appear to be the lack of information and strategic Internet skills, which, in the context of health, are very important. The lack of these skills is also problematic for members of younger generations, who are often considered skilled Internet users. This primarily seems to account for the operational and formal Internet skills. The results of the study strongly call for policies to increase the level of Internet skills. PMID:21531690
Occupational-Specific Strength Predicts Astronaut-Related Task Performance in a Weighted Suit.
Taylor, Andrew; Kotarsky, Christopher J; Bond, Colin W; Hackney, Kyle J
2018-01-01
Future space missions beyond low Earth orbit will require deconditioned astronauts to perform occupationally relevant tasks within a planetary spacesuit. The prediction of time-to-completion (TTC) of astronaut tasks will be critical for crew safety, autonomous operations, and mission success. This exploratory study determined if the addition of task-specific strength testing to current standard lower body testing would enhance the prediction of TTC in a 1-G test battery. Eight healthy participants completed NASA lower body strength tests, occupationally specific strength tests, and performed six task simulations (hand drilling, construction wrenching, incline walking, collecting weighted samples, and dragging an unresponsive crewmember to safety) in a 48-kg weighted suit. The TTC for each task was recorded and summed to obtain a total TTC for the test battery. Linear regression was used to predict total TTC with two models: 1) NASA lower body strength tests; and 2) NASA lower body strength tests + occupationally specific strength tests. Total TTC of the test battery ranged from 20.2-44.5 min. The lower body strength test alone accounted for 61% of the variability in total TTC. The addition of hand drilling and wrenching strength tests accounted for 99% of the variability in total TTC. Adding occupationally specific strength tests (hand drilling and wrenching) to standard lower body strength tests successfully predicted total TTC in a performance test battery within a weighted suit. Future research should couple these strength tests with higher fidelity task simulations to determine the utility and efficacy of task performance prediction.Taylor A, Kotarsky CJ, Bond CW, Hackney KJ. Occupational-specific strength predicts astronaut-related task performance in a weighted suit. Aerosp Med Hum Perform. 2018; 89(1):58-62.
Jalal, Tengku Mardhiah Tengku; Abdullah, Sarimah; Wahab, Farhanah Abd; Dir, Sharina; Naing, Nyi Nyi
2017-12-01
One of the six strategies developed by WHO, in order to stop Tuberculosis (TB) is addressing TB/HIV high-risk groups. This study aimed to determine the prevalence of successful TB treatment and factors associated with TB treatment success among TB/HIV co-infection patients in North-East Malaysia. A cross-sectional study was carried out in the a-year period from 2003 to 2012 by reviewing TB/HIV records in all hospitals and health clinics. The outcome of interest was treatment success as defined by Ministry of Health (MOH) when the patients was cured or completed TB treatment. Out of 1510 total TB/HIV co-infection cases, 27.9% (95% CI: 25.2, 30.6) of the patients were having treatment success. A majority of TB/HIV co-infection cases were male (91.1%). Fifty-eight percent the patients were drug addicts and 6% were having positive tuberculin tests. The multiple logistic regression revealed that male (OR: 0.39, 95% CI: 0.22, 0.71) and positive tuberculin test result (OR: 2.61, 95% CI: 1.63, 4.19) were significantly associated with the treatment success of TB/HIV co-infection patients. Other factors such as age, comorbid, sputum smear and x-ray findings were not significantly factors in this study. Female patients and those with negative tuberculin test should be emphasised for successful tuberculosis treatment.
Roos, Margaret A; Reisman, Darcy S; Hicks, Gregory; Rose, William; Rudolph, Katherine S
2016-01-01
Adults with stroke have difficulty avoiding obstacles when walking, especially when a time constraint is imposed. The Four Square Step Test (FSST) evaluates dynamic balance by requiring individuals to step over canes in multiple directions while being timed, but many people with stroke are unable to complete it. The purposes of this study were to (1) modify the FSST by replacing the canes with tape so that more persons with stroke could successfully complete the test and (2) examine the reliability and validity of the modified version. Fifty-five subjects completed the Modified FSST (mFSST) by stepping over tape in all four directions while being timed. The mFSST resulted in significantly greater numbers of subjects completing the test than the FSST (39/55 [71%] and 33/55 [60%], respectively) (p < 0.04). The test-retest, intrarater, and interrater reliability of the mFSST were excellent (intraclass correlation coefficient ranges: 0.81-0.99). Construct and concurrent validity of the mFSST were also established. The minimal detectable change was 6.73 s. The mFSST, an ideal measure of dynamic balance, can identify progress in people with stroke in varied settings and can be completed by a wide range of people with stroke in approximately 5 min with the use of minimal equipment (tape, stop watch).
Evaluating and Enhancing Driving Ability among Teens with Autism Spectrum Disorder (ASD)
2013-10-01
Click Add Driver iii. Type in the participant number for the First Name, Last Name, and Username boxes. For the email use the participantnumber...successful completion the participant will attempt the hazard detection operational test. Appendix 1 - 25 Step 8, Multitasking 1. Goals
Marketing and Distribution: A Team Plan for In-Service Follow-Up
ERIC Educational Resources Information Center
Mason, Ralph E.
1976-01-01
Distributive education (DE) teacher education universities in Indiana completed a consortium testing an exemplary plan to use in followup service activities with first- and second-year distributive education teachers. How the plan was developed and ways in which it was successful are discussed. (HD)
CTEPP STANDARD OPERATING PROCEDURE FOR TRANSLATING VIDEOTAPES OF CHILD ACTIVITIES (SOP-4.13)
The EPA will conduct a two-day video translation workshop to demonstrate to coders the procedures for translating the activity patterns of preschool children on videotape. The coders will be required to pass reliability tests to successfully complete the training requirements of ...
Orion Exploration Flight Test-1 (EFT-1) Absolute Navigation Performance
NASA Technical Reports Server (NTRS)
Zanetti, Renato
2015-01-01
The Orion vehicle, being design to take men back to the Moon and beyond, successfully completed its first flight test, EFT-1 (Exploration Flight Test-1), on December 5th, 2014. The main objective of the test was to demonstrate the capability of re-enter into the Earth's atmosphere and safely splash-down into the pacific ocean. This un-crewed mission completes two orbits around Earth, the second of which is highly elliptical with an apogee of approximately 5908 km, higher than any vehicle designed for humans has been since the Apollo program. The trajectory was designed in order to test a high-energy re-entry similar to those crews will undergo during lunar missions. The mission overview is shown in Figure 1. The objective of this paper is to document the performance of the absolute navigation system during EFT-1 and to present its design.
Clinical evaluation of the Novacor totally implantable ventricular assist system. Current status.
Daniel, M A; Lee, J; LaForge, D H; Chen, H; Billich, J; Miller, P J; Ramasamy, N; Strauss, L R; Jassawalla, J S; Portner, P M
1991-01-01
The totally implantable Novacor left ventricular assist system (LVAS) is currently approaching clinical evaluation. In vivo testing and production are underway with National Institutes of Health (NIH) support. Activity over the past year has focused on manufacturing engineering, preproduction quality assurance, and in vivo experiment completion. Subsequent to successful completion of the NIH-sponsored, 2-year preclinical device readiness test (DRT), a number of refinements were identified and approved by the NIH technical/data review board. Most of these were necessitated by obsolescence or unavailability of electronic components and the decision to use only high reliability military (MIL) qualified electronic components and processes. A few additional refinements were identified to increase design margins, all of which were qualified by accelerated testing. The development of production processes, automated test programs, and MIL compliant environmental stress screening procedures was completed. Production of LVAS subsystems, including core electronic components (hybrids, application-specific integrated circuits, and surface mount boards), was initiated. Animal studies are underway. The clinical trial, at Presbyterian-University Hospital of Pittsburgh and St. Louis University Medical Center, awaits completion of in vivo experiments, protocol development, and Food and Drug Administration approval.
Orion Boiler Plate Airdrop Test System
NASA Technical Reports Server (NTRS)
Machin, Ricardo A.; Evans, Carol T.
2013-01-01
On the 29th of February 2012 the Orion Capsule Parachute Assembly System (CPAS) project attempted to perform an airdrop test of a boilerplate test article for the second time. The first attempt (Cluster Development Test 2, July 2008) to deliver a similar boilerplate from a C-17 using the Low Velocity Air Drop (LVAD) technique resulted in the programmer parachute failing to properly inflate, the test article failing to achieve the desired test initiation conditions, and the test article a total loss. This paper will pick up where the CDT-2 failure investigation left off, describing the test technique that was adopted, and outline the modeling that was performed to gain confidence that the second attempt would be successful. The second boiler plate test (Cluster Development Test 3-3) was indeed a complete success and has subsequently been repeated several times, allowing the CPAS project to proceed with the full scale system level development testing required to integrate the hardware to the first Entry Flight Test vehicle as well as go into the Critical Design Review with minimum risk and a mature design.
Development of Reliable Life Support Systems
NASA Technical Reports Server (NTRS)
Carter, Layne
2017-01-01
The life support systems on the International Space Station (ISS) are the culmination of an extensive effort encompassing development, design, and test to provide the highest possible confidence in their operation on ISS. Many years of development testing are initially performed to identify the optimum technology and the optimum operational approach. The success of this development program depends on the accuracy of the system interfaces. The critical interfaces include the specific operational environment, the composition of the waste stream to be processed and the quality of the product. Once the development program is complete, a detailed system schematic is built based on the specific design requirements, followed by component procurement, assembly, and acceptance testing. A successful acceptance test again depends on accurately simulating the anticipated environment on ISS. The ISS Water Recovery System (WRS) provides an excellent example of where this process worked, as well as lessons learned that can be applied to the success of future missions. More importantly, ISS has provided a test bed to identify these design issues. Mechanical design issues have included an unreliable harmonic drive train in the Urine Processor's fluids pump, and seals in the Water Processor's Catalytic Reactor with insufficient life at the operational temperature. Systems issues have included elevated calcium in crew urine (due to microgravity effect) that resulted in precipitation at the desired water recovery rate, and the presence of an organosilicon compound (dimethylsilanediol) in the condensate that is not well removed by the water treatment process. Modifications to the WRS to address these issues are either complete (and now being evaluated on ISS) or are currently in work to insure the WRS has the required reliability before embarking on a mission to Mars.
F-16XL ship #1 (#849) during first flight of the Digital Flight Control System (DFCS)
NASA Technical Reports Server (NTRS)
1997-01-01
After completing its first flight with the Digital Flight Control System on December 16, 1997, the F-16XL #1 aircraft began a series of envelope expansion flights. On January 27 and 29, 1998, it successfully completed structural clearance tests, as well as most of the load testing Only flights at Mach 1.05 at 10,000 feet, Mach 1.1 at 15,000 feet, and Mach 1.2 at 20,000 feet remained. During the next flight, on February 4, an instrumentation problem cut short the planned envelope expansion tests. After the problem was corrected, the F-16XL returned to flight status, and on February 18 and 20, flight control and evaluation flights were made. Two more research flights were planned for the following week, but another problem appeared. During the ground start up, project personnel noticed that the leading edge flap moved without being commanded. The Digital Flight Control Computer was sent to the Lockheed-Martin facility at Fort Worth, where the problem was traced to a defective chip in the computer. After it was replaced, the F-16XL #1 flew a highly successful flight controls and handling qualities evaluation flight on March 26, clearing the way for the final tests. The final limited loads expansion flight occurred on March 31, and was fully successful. As a result, the on-site Lockheed-Martin loads engineer cleared the aircraft to Mach 1.8. The remaining two handling qualities and flight control evaluation flights were both made on April 3, 1998. These three flights concluded the flight test portion of the DFCS upgrade.
ERIC Educational Resources Information Center
Kong, S. C.
2008-01-01
Two cycles of design-based research of a cognitive tool (CT) for teaching fractions have been completed. Following the success of a quasi-experimental study of the enhanced CT derived from the second cycle of design-based research, this article reports the findings of a pre-test-post-test control group empirical study using the enhanced CT in the…
NASA Technical Reports Server (NTRS)
Labberton, D.
1974-01-01
A preliminary evaluation of environmental capabilities was undertaken on toggle switches and on Apollo-type toggle switches. The purpose of this evaluation was to take a first look at their tested capabilities for the purpose of determining whether the candidate hardware appears to have a good chance of successfully completing a detailed envrionmental qualification test program.
Crofton, C C; Foley, S J
2018-02-01
Mobile phone use by healthcare workers (HCWs) is widespread. Studies have shown that HCW's mobile phones can harbour pathogens associated with nosocomial infections. This study investigated whether an awareness campaign will result in an improvement in radiographers' phone and hand hygiene practices. Radiographers working in the general department of two university hospitals were invited to participate. One hospital was assigned as the experiment hospital and the other as a control. In the experiment hospital, adenosine triphosphate (ATP) testing of each participant's mobile phone determined the cleanliness of its surface. A corresponding survey was completed to determine their current practices and level of awareness. Subsequently, an infection control poster campaign took place for a one-month period, followed by re-testing. In the control hospital, the ATP testing and survey were also completed before and after a one-month period, but without a poster campaign. Radiographers were generally unaware of the infection risks associated with mobile phone use with 44% of all participants never cleaning their phone. The campaign successfully improved phone hygiene frequency and method in the experiment hospital. However, it did not improve hand hygiene practices and actual phone cleanliness (mean ATP count reductions of 10% (experiment hospital) and 20% (control)). The ATP testing as a less direct form of intervention showed similar levels of success in comparison to the poster campaign. A multifaceted educational approach is likely to be most effective in raising awareness and changing radiographers' phone and hand hygiene practices. Copyright © 2017 The College of Radiographers. Published by Elsevier Ltd. All rights reserved.
A study for hypergolic vapor sensor development
NASA Technical Reports Server (NTRS)
Stetter, J. R.; Tellefsen, K.
1977-01-01
In summary, the following tasks were completed within the scope of this work: (1) a portable Monomethylhydrazine analyzer was developed, designed, fabricated and tested. (2) A portable NO2 analyzer was developed, designed, fabricated and tested. (3) Sampling probes and accessories were designed and fabricated for this instrumentation. (4) Improvements and modifications were made to the model 7630 Ecolyzer in preparation for field testing. (5) Instrument calibration procedures and hydrazine handling techniques necessary to the successful application of this hardware were developed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cosimbescu, Lelia; Robinson, Joshua W.; Bays, John Timothy
The manuscript captures the chronological succession of the molecular design progression through multiple architectures and topologies of the polymeric viscosity index improvers and their rheology bench test performance. Tribology testing was also performed on selected analogs and their friction and wear was evaluated. Finally, a top performing polymer was selected for engine testing, scaled-up, and its rheological performance in a complete formulation was assessed. The engine performance of the viscosity index improver was examined against an industry-established baseline.
1992-06-01
gene mutation procedures normally is done involving microbes or mammalian cells- most frequently it is the Ames assay which we have already completed...success- fully for the compound Emery 3004. Tier 2 assays for gene mutation utilize in vivo and host mediated tests which usually are considered in...compounds for more complex costly test procedures can be accomplished in this tier, but results should not be used to estimate risk to mammalian systems. Gene
NASA Technical Reports Server (NTRS)
Ravenhall, R.; Salemme, C. T.
1977-01-01
A total of 38 quiet clean short haul experimental engine under the wing composite fan blades were manufactured for various component tests, process and tooling, checkout, and use in the QCSEE UTW engine. The component tests included frequency characterization, strain distribution, bench fatigue, platform static load, whirligig high cycle fatigue, whirligig low cycle fatigue, whirligig strain distribution, and whirligig over-speed. All tests were successfully completed. All blades planned for use in the engine were subjected to and passed a whirligig proof spin test.
NASA Astrophysics Data System (ADS)
Shepherd, O.; Aurilio, G.; Bucknam, R. D.; Hurd, A. G.; Rappaport, S. A.
1991-06-01
This is Volume 1 of a three volume final report on the design, development, and test of balloonborne and groundbased lidar systems. Volume 2 describes the flight test of Atmospheric Balloonborne Lidar Experiment, ABLE 2, which successfully made atmospheric density backscatter measurements during a flight over White Sands Missile Range. Volume 3 describes groundbased lidar development and measurements, including the design of a telescope dome lidar installation, the design of a transportable lidar shed for remote field sites, and field measurements of atmospheric and cloud backscatter from Ascension Island during SABLE 89 and Terciera, Azores during GABLE 90. In this volume, Volume 1, the design and fabrication of a balloonborne CO2 coherent lidar payload are described. The purpose of this payload is to measure, from altitudes greater than 20 km, the 10.6 micrometers backscatter from atmospheric aerosols as a function of altitude. Minor modifications to the lidar would provide for aerosol velocity measurements to be made. The lidar and payload system design was completed, and major components were fabricated and assembled. These tasks have been successfully completed, and recommendations for further lidar measurements and data analysis have been made.
Recent Advances in Solar Sail Propulsion at NASA
NASA Technical Reports Server (NTRS)
Johnson, Les; Young, Roy M.; Montgomery, Edward E., IV
2006-01-01
Supporting NASA's Science Mission Directorate, the In-Space Propulsion Technology Program is developing solar sail propulsion for use in robotic science and exploration of the solar system. Solar sail propulsion will provide longer on-station operation, increased scientific payload mass fraction, and access to previously inaccessible orbits for multiple potential science missions. Two different 20-meter solar sail systems were produced and successfully completed functional vacuum testing last year in NASA Glenn's Space Power Facility at Plum Brook Station, Ohio. The sails were designed and developed by ATK Space Systems and L'Garde, respectively. These sail systems consist of a central structure with four deployable booms that support the sails. This sail designs are robust enough for deployments in a one atmosphere, one gravity environment, and are scalable to much larger solar sails-perhaps as much as 150 meters on a side. In addition, computation modeling and analytical simulations have been performed to assess the scalability of the technology to the large sizes (>150 meters) required for first generation solar sails missions. Life and space environmental effects testing of sail and component materials are also nearly complete. This paper will summarize recent technology advancements in solar sails and their successful ambient and vacuum testing.
Further Research on an Undergraduate Measure of Professional Development Engagement
ERIC Educational Resources Information Center
Blau, Gary; Pred, Robert; Andersson, Lynne; Lopez, Andrea B.
2015-01-01
Professional Development Engagement (PDE) refers to the level of undergraduate engagement in professional development. Professional Development (PD) involves activities designed to help students prepare for a successful college-to-work transition. This study tested a new 12-item measure of PDE for a complete-data sample of 246 undergraduate…
Anatomy of a bearing torque problem
NASA Technical Reports Server (NTRS)
Phinney, Damon D.
1987-01-01
In the early 1970s, an antenna despin drive was developed for MBB solar science satellite HELIOS. A problem with high bearing drag torque that was encountered on the two flight models of this drive, after successful tests were completed on twelve bearings, an engineering model, and the qualification unit is discussed.
ERIC Educational Resources Information Center
DeLoughry, Thomas J.
1995-01-01
The University of California at Santa Cruz has completed a successful test of a wireless computer network that would enable students and professors to get on line from anywhere on campus. The network, linked by radio waves, could save millions of dollars in campus wiring costs and would better meet student and faculty information needs. (MSE)
14 CFR 29.562 - Emergency landing dynamic conditions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Emergency landing dynamic conditions. 29... Conditions § 29.562 Emergency landing dynamic conditions. (a) The rotorcraft, although it may be damaged in a... landing must successfully complete dynamic tests or be demonstrated by rational analysis based on dynamic...
Exploring Ways to Improve DTAG Deployment Success Rates with the ARTS Pneumatic Launcher
2011-09-30
spring, four springs, no spring), and a different shock absorber system has been developed, (the giraffe leg technique or GL, Figure 2), which has...GL ( giraffe leg technique) with 3 studs (right) WORK COMPLETED During the testing period various dummy whale targets were constructed for
Intravenous Therapy Instruction for Licensed Practical Nurses. Instructor's Guide.
ERIC Educational Resources Information Center
Springer, Pam; Carey, Jean
This Idaho instructor's guide lists tasks and enabling objectives, outlines instruction, and provides handout masters, overhead masters, and tests for intravenous therapy (IV) instruction for licensed practical nurses. Following an introduction and a list of criteria for successful completion of IV therapy courses, the document lists tasks and…
Development of Infrared Phase Closure Capability in the Infrared-Optical Telescope Array (IOTA)
NASA Technical Reports Server (NTRS)
Traub, Wesley A.
2002-01-01
We completed all major fabrication and testing for the third telescope and phase-closure operation at the Infrared-Optical Telescope Array (IOTA) during this period. In particular we successfully tested the phase-closure operation, using a laboratory light source illuminating the full delay-line optical paths, and using an integrated-optic beam combiner coupled to our Picnic-detector camera. This demonstration is an important and near-final milestone achievement. As of this writing, however, several tasks yet remain, owing to development snags and weather, so the final proof of success, phase-closure observation of a star, is now expected to occur in early 2002, soon after this report has been submitted.
NASA Technical Reports Server (NTRS)
Piazza, Anthony; Hudson, Larry D.; Richards, W. Lance
2005-01-01
Fiber Optic Strain Measurements: a) Successfully attached silica fiber optic sensors to both metallics and composites; b) Accomplished valid EFPI strain measurements to 1850 F; c) Successfully attached EFPI sensors to large scale hot-structures; and d) Attached and thermally validated FBG bond and epsilon(sub app). Future Development a) Improve characterization of sensors on C-C and C-SiC substrates; b) Apply application to other composites such as SiC-SiC; c) Assist development of interferometer based Sapphire sensor currently being conducted under a Phase II SBIR; and d) Complete combined thermal/mechanical testing of FBG on composite substrates in controlled laboratory environment.
Evaluation of remote hydrologic data-acquisition systems, west-central Florida
Turner, J.F.; Woodham, W.M.
1980-01-01
The study provides an evaluation of the hydrologic applications of a land-line and two satellite data-relay systems operated during 1977-78 in the Southwest Florida Water Management District. These systems were tested to evaluate operational and reliability characteristics. Telephone lines were used to relay data in the land-line system, and the Geostationary Operational Environmental Satellite (GOES) and Land satellite (Landsat) were used in the satellite system. The land-line system was tested for 15 months at a streamflow site. Accurate data were obtained 94% of the time during the test period. Data losses were attributed to telephone-line interference, low-battery voltage, and vandalism. The GOES system was tested at a rainfall site for 17 months. During this period, 79% of the transmissions received from the station were relayed by the GOES system to the U.S. Geological Survey computer, resulting in successful processing of 88% of all possible rainfall observations. On the average, seven data transmissions were completed each day. The Landsat system was tested at a rainfall site for about 17 months and for about 8 months at a streamflow site. During these periods of operation, only about 2% of all data observations for the stations were successfully relayed by the Landsat system to the U.S. Geological Survey computer. An average of about three data transmissions was completed each day for each site. (USGS).
NASA Technical Reports Server (NTRS)
1975-01-01
Results of tests conducted on preliminary design polymeric-composite fan blade for the under the wing (UTW) OCSEE engine are presented. During this phase of the program a total of 17preliminary OCSEE UTW composite fan blades were manufactured for various component tests including frequency characteristics, strain distribution, bench fatigue, dovetail pull, whirligig overspeed and whirligig impact. All tests were successfully completed with the exception of whirligig impact tests. Improvements in local impact capability are being evaluated for the OCSEE blade under other NASA and related programs.
Development of optimized PPP insulated pipe-cable systems in the commercial voltage range
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allam, E.M.; McKean, A.L.
1992-05-01
The primary objectives of this project included the development of an alternate domestic source of Paper-Polypropylene-Paper (PPP) laminate and the development of optimized designs for PPP-insulated pipe-type cable systems in the commercial voltage range. The development of a domestic source of PPP laminate was successfully completed. This laminate was utilized throughout the program for fabrication of full-size prototype cables submitted for laboratory qualification tests. Selected cables at rated voltages of 138, 230 and 345kV have been designed, fabricated and subjected to the series of qualification tests leading to full laboratory qualification. An optimized design of 2000 kcmil, 345kV cable insulatedmore » with 600 mils of domestic PPP laminate was fabricated and successfully passed all laboratory qualification tests. This cable design was subsequently installed at Waltz Mill to undergo the series of field tests leading to full commercial qualification.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allam, E.M.; McKean, A.L.
1992-05-01
The primary objectives of this project included the development of an alternate domestic source of Paper-Polypropylene-Paper (PPP) laminate and the development of optimized designs for PPP-insulated pipe-type cable systems in the commercial voltage range. The development of a domestic source of PPP laminate was successfully completed. This laminate was utilized throughout the program for fabrication of full-size prototype cables submitted for laboratory qualification tests. Selected cables at rated voltages of 138, 230 and 345kV have been designed, fabricated and subjected to the series of qualification tests leading to full laboratory qualification. An optimized design of 2000 kcmil, 345kV cable insulatedmore » with 600 mils of domestic PPP laminate was fabricated and successfully passed all laboratory qualification tests. This cable design was subsequently installed at Waltz Mill to undergo the series of field tests leading to full commercial qualification.« less
Solid electrolyte oxygen regeneration system
NASA Technical Reports Server (NTRS)
Shumar, J. W.; See, G. G.; Schubert, F. H.; Powell, J. D.
1976-01-01
A program to design, develop, fabricate and assemble a one-man, self-contained, solid electrolyte oxygen regeneration system (SX-1) incorporating solid electrolyte electrolyzer drums was completed. The SX-1 is a preprototype engineering model designed to produce 0.952 kg (2.1 lb)/day of breathable oxygen (O2) from the electrolysis of metabolic carbon dioxide (CO2) and water vapor. The CO2 supply rate was established based on the metabolic CO2 generation rate for one man of 0.998 kg (2.2 lb)/day. The water supply rate (0.254 kg (0.56 lb)/day) was designed to be sufficient to make up the difference between the 0.952 kg (2.1 lb)/day O2 generation specification and the O2 available through CO2 electrolysis, 0.726 kg (1.6 lb)/day. The SX-1 was successfully designed, fabricated and assembled. Design verification tests (DVT) or the CO Disproportionators, H2 separators, control instrumentation, monitor instrumentation, water feed mechanism were successfully completed. The erratic occurrence of electrolyzer drum leakage prevented the completion of the CO2 electrolyzer module and water electrolyzer module DVT's and also prevented the performance of SX-1 integrated testing. Further development work is required to improve the solid electrolyte cell high temperature seals.
PRDA-2 and 3 Brush Seal Development Programs at EG and G
NASA Technical Reports Server (NTRS)
Loewenthal, Robert G.
1996-01-01
EG&G Mechanical Components Technology Group R&D completed a Brush Seal Development Program under PRDA-2 in late 1992. We started the Advanced Brush Seal Development program, under PRDA-3, in 1993 and will complete it in 1996. Both programs have been funded by the United States Air Force. In the first program, we made significant gains in the area of tribopairs (bristle materials vs. shaft coatings) and the 'Low Hysteresis' design for brush seals. These were reported in two AIAA Propulsion Conference papers, and the 'Low Hysteresis' design has been patented. Seals were delivered for test in an Air Force demonstrator at Allison. In PRDA-3, goals are to increase the pressure sealing capability, and the surface speeds and temperatures at which brush seals can be used. We have conducted part of the design and testing and have tested brush seals successfully at more severe conditions than in the previous program. We are continuing with the program, and will complete it in time to furnish brush seals for an Air Force Demonstrator test in 1997.
2017-12-01
reverse dynamization. This was supplemented by finite element analysis and the use of a strain gauge. This aim was successfully completed, with the...testing deformation results for model validation. Development of a Finite Element (FE) model was conducted through ANSYS 16 to help characterize...Fixators were characterized through mechanical testing by sawbone and ovine cadaver tibiae samples, and data was used to validate a finite element
An Introductory Review Module For an Anti-Infectives Therapeutics Course
Murphy, Kendrick; Zaeem, Maryam; DiVall, Margarita V.
2012-01-01
Objective. To determine whether an introductory review module using a hybrid-learning approach helped students learn infectious disease management in an anti-infectives therapeutics course. Design. An introductory module consisting of an online pharmacology review, pre-class assignment, 2 classroom lectures, and 1 case-based lecture was developed and implemented. Assessment. Among the 110 students who completed pre- and post-tests on the material covered, average scores increased from 71% to 83% (p<0.0001). Performance on knowledge-based question improved for 8 out of 10 questions (p<0.05) and student confidence increased from the first lecture to completion of the module (p<0.001 for all comparisons). Of the 129 students who completed an evaluation of the introductory module, 98% strongly agreed or agreed that the content was essential for course success. Conclusion. The addition of an introductory module using a hybrid-learning approach to review and solidify concepts of medical microbiology and pharmacology provided the foundation necessary for success in an infectious diseases module. PMID:23049107
Factors Influencing Clinical Performance of Baccalaureate Nursing Majors: A Retrospective Audit.
Johnston, Sandra; Fox, Amanda; Coyer, Fiona Maree
2018-06-01
Transition of nursing student to new graduate depends on successful completion of clinical work placement during an undergraduate course. Supporting students during the clinical placement is imperative. This study examined associations between grade point average, domestic or international status, course entry qualification, and single or dual nursing degree to successful completion of clinical placement. A retrospective audit of 665 students in a baccalaureate nursing program was conducted to examine factors influencing clinical performance of baccalaureate nursing students. A significant association between entry qualification, lower grade point average, international status, and receipt of a constructive note was found: χ 2 = 8.678, df = 3, p = .034, t(3.862), df = 663, p ⩽ .001, and Fisher's exact test = 8.581, df = 1, p = .003, respectively. Understanding factors that affect clinical performance may help early identification of students at risk and allow for supportive intervention during placement and subsequent program completion. [J Nurs Educ. 2018;57(6):333-338.]. Copyright 2018, SLACK Incorporated.
Evaluation of a training curriculum for prehospital trauma ultrasound.
Press, Gregory M; Miller, Sara K; Hassan, Iman A; Blankenship, Robert; del Junco, Deborah; Camp, Elizabeth; Holcomb, John B
2013-12-01
In the United States, ultrasound has rarely been incorporated into prehospital care, and scant descriptions of the processes used to train prehospital providers are available. Our objective was to evaluate the effectiveness of an extended focused assessment with sonography for trauma (EFAST) training curriculum that incorporated multiple educational modalities. We also aimed to determine if certain demographic factors predicted successful completion. All aeromedical prehospital providers (APPs) for a Level I trauma center took a 25-question computer-based test to ascertain baseline knowledge. Questions were categorized by content and format. Training over a 2-month period included a didactic course, a hands-on training session, proctored scanning sessions in the Emergency Department, six Internet-based training modules, pocket flashcards, a review session, and remedial training. At the conclusion of the training curriculum, the same test and an objective structured clinical examination were administered to evaluate knowledge gained. Thirty-three of 34 APPs completed training. The overall pre-test and post-test means and all content and format subsets showed significant improvement (p < 0.0001 for all). No APP passed the pre-test, and 28 of 33 passed the post-test with a mean score of 78%. No demographic variable predicted passing the post-test. Twenty-seven of 33 APPs passed the objective structured clinical examination, and the only predictive variable was passing the post-test (odds ratio 1.21, 95% confidence interval 1.00-1.25, p = 0.045). The implementation of a multifaceted EFAST prehospital training program is feasible. Significant improvement in overall and subset testing scores suggests that the test instrument was internally consistent and sufficiently sensitive to capture knowledge gained as a result of the training. Demographic variables were not predictive of test success. Copyright © 2013 Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Fey, M. G.
1981-01-01
The experimental verification system for the production of silicon via the arc heater-sodium reduction of SiCl4 was designed, fabricated, installed, and operated. Each of the attendant subsystems was checked out and operated to insure performance requirements. These subsystems included: the arc heaters/reactor, cooling water system, gas system, power system, Control & Instrumentation system, Na injection system, SiCl4 injection system, effluent disposal system and gas burnoff system. Prior to introducing the reactants (Na and SiCl4) to the arc heater/reactor, a series of gas only-power tests was conducted to establish the operating parameters of the three arc heaters of the system. Following the successful completion of the gas only-power tests and the readiness tests of the sodium and SiCl4 injection systems, a shakedown test of the complete experimental verification system was conducted.
Continuous-flow stirred-tank reactor 20-L demonstration test: Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, D.D.; Collins, J.L.
One of the proposed methods of removing the cesium, strontium, and transuranics from the radioactive waste storage tanks at Savannah River is the small-tank tetraphenylborate (TPB) precipitation process. A two-reactor-in-series (15-L working volume each) continuous-flow stirred-tank reactor (CSTR) system was designed, constructed, and installed in a hot cell to test the Savannah River process. The system also includes two cross-flow filtration systems to concentrate and wash the slurry produced in the process, which contains the bulk of radioactivity from the supernatant processed through the system. Installation, operational readiness reviews, and system preparation and testing were completed. The first test usingmore » the filtration systems, two CSTRs, and the slurry concentration system was conducted over a 61-h period with design removal of Cs, Sr, and U achieved. With the successful completion of Test 1a, the following tests, 1b and 1c, were not required.« less
Adriaens, E; Alépée, N; Kandarova, H; Drzewieckac, A; Gruszka, K; Guest, R; Willoughby, J A; Verstraelen, S; Van Rompay, A R
2017-10-01
Assessment of the acute eye irritation potential is part of the international regulatory requirements for testing of chemicals. In the past, several prospective and retrospective validation studies have taken place in the area of serious eye damage/eye irritation testing. Success in terms of complete replacement of the regulatory in vivo Draize rabbit eye test has not yet been achieved. A very important aspect to ensure development of successful alternative test methods and/or strategies for serious eye damage/eye irritation testing is the selection of appropriate reference chemicals. A set of 80 reference chemicals was selected for the CEFIC-LRI-AIMT6-VITO CON4EI (CONsortium for in vitro Eye Irritation testing strategy) project, in collaboration with Cosmetics Europe, from the Draize Reference Database published by Cosmetics Europe based on key criteria that were set in their paper (e.g. balanced by important driver of classification and physical state). The most important goals of the CON4EI project were to identify the performance of eight in vitro alternative tests in terms of driver of classification and to identify similarities/differences between the methods in order the build a successful testing strategy that can discriminate between all UN GHS categories. This paper provides background on selection of the test chemicals. Copyright © 2017 Elsevier Ltd. All rights reserved.
Adriaens, E; Alépée, N; Kandarova, H; Drzewieckac, A; Gruszka, K; Guest, R; Willoughby, J A; Verstraelen, S; Van Rompay, A R
2018-06-01
Assessment of the acute eye irritation potential is part of the international regulatory requirements for testing of chemicals. In the past, several prospective and retrospective validation studies have taken place in the area of serious eye damage/eye irritation testing. Success in terms of complete replacement of the regulatory in vivo Draize rabbit eye test has not yet been achieved. A very important aspect to ensure development of successful alternative test methods and/or strategies for serious eye damage/eye irritation testing is the selection of appropriate reference chemicals. A set of 80 reference chemicals was selected for the CEFIC-LRI-AIMT6-VITO CON4EI (CONsortium for in vitro Eye Irritation testing strategy) project, in collaboration with Cosmetics Europe, from the Draize Reference Database published by Cosmetics Europe based on key criteria that were set in their paper (e.g. balanced by important driver of classification and physical state). The most important goals of the CON4EI project were to identify the performance of eight in vitro alternative tests in terms of driver of classification and to identify similarities/differences between the methods in order the build a successful testing strategy that can discriminate between all UN GHS categories. This paper provides background on selection of the test chemicals. Copyright © 2018. Published by Elsevier Ltd.
Fragon: rapid high-resolution structure determination from ideal protein fragments.
Jenkins, Huw T
2018-03-01
Correctly positioning ideal protein fragments by molecular replacement presents an attractive method for obtaining preliminary phases when no template structure for molecular replacement is available. This has been exploited in several existing pipelines. This paper presents a new pipeline, named Fragon, in which fragments (ideal α-helices or β-strands) are placed using Phaser and the phases calculated from these coordinates are then improved by the density-modification methods provided by ACORN. The reliable scoring algorithm provided by ACORN identifies success. In these cases, the resulting phases are usually of sufficient quality to enable automated model building of the entire structure. Fragon was evaluated against two test sets comprising mixed α/β folds and all-β folds at resolutions between 1.0 and 1.7 Å. Success rates of 61% for the mixed α/β test set and 30% for the all-β test set were achieved. In almost 70% of successful runs, fragment placement and density modification took less than 30 min on relatively modest four-core desktop computers. In all successful runs the best set of phases enabled automated model building with ARP/wARP to complete the structure.
Solar Airplanes and Regenerative Fuel Cells
NASA Technical Reports Server (NTRS)
Bents, David J.
2007-01-01
A solar electric aircraft with the potential to "fly forever" has captured NASA's interest, and the concept for such an aircraft was pursued under Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project. Feasibility of this aircraft happens to depend on the successful development of solar power technologies critical to NASA's Exploration Initiatives; hence, there was widespread interest throughout NASA to bring these technologies to a flight demonstration. The most critical is an energy storage system to sustain mission power during night periods. For the solar airplane, whose flight capability is already limited by the diffuse nature of solar flux and subject to latitude and time of year constraints, the feasibility of long endurance flight depends on a storage density figure of merit better than 400-600 watt-hr per kilogram. This figure of merit is beyond the capability of present day storage technologies (other than nuclear) but may be achievable in the hydrogen-oxygen regenerative fuel cell (RFC). This potential has led NASA to undertake the practical development of a hydrogen-oxygen regenerative fuel cell, initially as solar energy storage for a high altitude UAV science platform but eventually to serve as the primary power source for NASAs lunar base and other planet surface installations. Potentially the highest storage capacity and lowest weight of any non-nuclear device, a flight-weight RFC aboard a solar-electric aircraft that is flown continuously through several successive day-night cycles will provide the most convincing demonstration that this technology's widespread potential has been realized. In 1998 NASA began development of a closed cycle hydrogen oxygen PEM RFC under the Aeronautics Environmental Research Aircraft and Sensor Technology (ERAST) project and continued its development, originally for a solar electric airplane flight, through FY2005 under the Low Emissions Alternative Power (LEAP) project. Construction of the closed loop system began in 2002 at the NASA Glenn Research Center in Cleveland, Ohio. System checkout was completed, and testing began, in July of 2003. The initial test sequences were done with only a fuel cell or electrolyzer in the test rig. Those tests were used to verify the test apparatus, procedures, and software. The first complete cycles of the fully closed loop, regenerative fuel cell system were successfully completed in the following September. Following some hardware upgrades to increase reactant recirculation flow, the test rig was operated at full power in December 2003 and again in January 2004. In March 2004 a newer generation of fuel cell and electrolyzer stacks was substituted for the original hardware and these stacks were successfully tested at full power under cyclic operation in June of 2004.
Allen, Jeff; Robbins, Steve
2010-01-01
Using longitudinal student data from 15 four-year (n = 3,072) and 13 (n = 788) two-year postsecondary institutions, the authors tested the effects of interest-major congruence, motivation, and 1st-year academic performance on timely degree completion. Findings suggest that interest-major congruence has a direct effect on timely degree completion at both institutional settings and that motivation has indirect effects (via 1st-year academic performance). The total effects of both interest-major congruence and motivation on timely degree completion underscore the importance of both constructs in understanding student adjustment and postsecondary success. Implications for theory and counseling practice are discussed.
Phase 1 Space Fission Propulsion System Testing and Development Progress
NASA Technical Reports Server (NTRS)
VanDyke, Melissa; Houts, Mike; Godfroy, Tom; Dickens, Ricky; Poston, David; Kapernick, Rick; Reid, Bob; Salvail, Pat; Ring, Peter; Schafer, Charles (Technical Monitor)
2001-01-01
Successful development of space fission systems requires an extensive program of affordable and realistic testing. In addition to tests related to design/development of the fission system, realistic testing of the actual flight unit must also be performed. If the system is designed to operate within established radiation damage and fuel burn up limits while simultaneously being designed to allow close simulation of heat from fission using resistance heaters, high confidence in fission system performance and lifetime can be attained through a series of non-nuclear tests. The Safe Affordable Fission Engine (SAFE) test series, whose ultimate goal is the demonstration of a 300 kW flight configuration system, has demonstrated that realistic testing can be performed using non-nuclear methods. This test series, carried out in collaboration with other NASA centers, other government agencies, industry, and universities, successfully completed a testing program with a 30 kWt core, Stirling engine, and ion engine configuration. Additionally, a 100 kWt core is in fabrication and appropriate test facilities are being reconfigured. This paper describes the current SAFE non-nuclear tests, which includes test article descriptions, test results and conclusions, and future test plans.
ERIC Educational Resources Information Center
Ping, Ng Sau; Maniam, Mahendran
2015-01-01
Matriculation a pre-tertiary program offered by Ministry of Education for students who have completed their "Sijil Pelajaran Malaysia's" (SPM) examinations successfully. These excellent students will be required to sit for the Malaysian University English Test (MUET) before pursuing their studies in local colleges and universities. MUET…
Alternative Paths to Entry: New Jersey and Elsewhere.
ERIC Educational Resources Information Center
Uhler, Sayre
In 1983, New Jersey's governor, Tom Keane, proposed the Alternative Path to Certification as a means to alleviate the state's growing teacher shortage. At least 12 other states are now using similar plans to recruit teachers possessing liberal arts bachelor's degrees who have passed a standardized test and completed successfully a one-year…
Results of the 1984 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Downing, R. G.; Weiss, R. S.
1984-01-01
The 1984 solar cell calibration balloon flight was successfully completed on July 19, meeting all objectives of the program. Thirty-six modules were carried to an altitude of 36.0 kilometers. The calibrated cells can now be used as reference standards in simulator testing of cells and arrays.
Results of the 1986 NASA/JPL Balloon Flight Solar Calibration Program
NASA Technical Reports Server (NTRS)
Anspaugh, B. E.; Weiss, R. S.
1986-01-01
The 1986 solar cell calibration balloon flight was successfully completed on July 15, 1986, meeting all objectives of the program. Thirty modules were carried to an altitude of 118,000 ft (36.0 km). The calibrated cells can now be used as reference standards in simulator testing of cells and arrays.
Results of the 1982 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Downing, R. G.; Weiss, R. S.
1983-01-01
The 1982 solar cell calibration balloon flight was successfully completed on July 21, meeting all objectives of the program. Twenty-eight modules were carried to an altitude of 36.0 kilometers. The calibrated cells can now be used as reference standards in simulator testing of cells and arrays.
Self-Efficacy and Interest: Experimental Studies of Optimal Incompetence.
ERIC Educational Resources Information Center
Silvia, Paul J.
2003-01-01
To test the optimal incompetence hypothesis (high self-efficacy lowers task interest), 30 subjects rated interest, perceived difficulty, and confidence of success in different tasks. In study 2, 33 subjects completed a dart-game task in easy, moderate, and difficult conditions. In both, interest was a quadratic function of self-efficacy,…
Crossing the Bridge: GED Credentials and Postsecondary Educational Outcomes. Year One Report
ERIC Educational Resources Information Center
Patterson, Margaret Becker; Zhang, Jizhi; Song, Wei; Guison-Dowdy, Anne
2010-01-01
For most high school non-completers, the GED[R] credential provides a bridge to postsecondary education, but little is known about how successfully GED (General Educational Development) Test candidates make that transition and whether enrollment rates change with time. The American Council on Education (ACE) has begun a three-year longitudinal…
Studying for Success: Diaries of Students' Study Behaviours
ERIC Educational Resources Information Center
Tomes, Jennifer L.; Wasylkiw, Louise; Mockler, Brittany
2011-01-01
The current study examined students' study behaviours using a diary methodology. Given the limitations of previous investigations, participants were asked to complete daily study diaries for 10 days prior to a course test to assess students' actual study behaviours. Results showed that students engaged in a diverse set of behaviours with only some…
TMC Behavior Modeling and Life Prediction Under Multiaxial Stresses
NASA Technical Reports Server (NTRS)
Merrick, H. F.; Aksoy, S. Z.; Costen, M.; Ahmad, J.
1998-01-01
The goal of this program was to manufacture and burst test small diameter SCS-6/Ti-6Al-4V composite rings for use in the design of an advanced titanium matrix composite (TMC) impeller. The Textron Specialty Metals grooved foil-fiber process was successfully used to make high quality TMC rings. A novel spin test arbor with "soft touch" fingers to retain the TMC ring was designed and manufactured. The design of the arbor took into account its use for cyclic experiments as well as ring burst tests. Spin testing of the instrumented ring was performed at ambient, 149C (300F), and 316C (600F) temperatures. Assembly vibration was encountered during spin testing but this was overcome through simple modification of the arbor. A spin-to-burst test was successfully completed at 316C (600F). The rotational speed of the TMC ring at burst was close to that predicted. In addition to the spin test program, a number of SCS-6/Ti-6Al-4V test panels were made. Neat Ti-6Al-4V panels also were made.
NASA Astrophysics Data System (ADS)
Urry, C. Megan
1997-01-01
This grant was awarded to Dr. C. Megan Urry of the Space Telescope Science Institute in response to two successful ADP proposals to use archival Ginga and Rosat X-ray data for 'Testing the Pairs-Reflection model with X-Ray Spectral Variability' (in collaboration with Paola Grandi, now at the University of Rome) and 'X-Ray Properties of Complete Samples of Radio-Selected BL Lacertae Objects' (in collaboration with then-graduate student Rita Sambruna, now a post-doc at Goddard Space Flight Center). In addition, post-docs Joseph Pesce and Elena Pian, and graduate student Matthew O'Dowd, have worked on several aspects of these projects. The grant was originally awarded on 3/01/94; this report covers the full period, through May 1997. We have completed our project on the X-ray properties of radio-selected BL Lacs.
LANDSAT menhaden and thread herring resources investigation. [Northern Gulf of Mexico
NASA Technical Reports Server (NTRS)
Kemmerer, A. J. (Principal Investigator)
1975-01-01
The author has identified the following significant results. The most significant achievement realized thus far has been the successful completion of the data acquisition phase. This success must be attributed to the interest, support, and competency of the participants. The apparent consistency of water color and turbidity condition over time and between test sites at sites of menhaden capture is significant especially since color is readily measured with satellite and aircraft sensors and a LANDSAT MSS based computer model for inferring tubidity has been developed.
Fielding An Amphibious UAV: Development, Results, and Lessons Learned
NASA Technical Reports Server (NTRS)
Pisanich, Greg; Morris, Stephen
2002-01-01
This report summarizes the work completed on the design and flight-testing of a small, unmanned, amphibious demonstrator aircraft that flies autonomously. The aircraft named ACAT (Autonomous Cargo Amphibious Transport) is intended to be a large cargo carrying unmanned aircraft that operates from water to avoid airspace and airfield conflict issues between manned and unmanned aircraft. To demonstrate the feasibility of this concept, a demonstrator ACAT was designed, built, and flown that has a six-foot wingspan and can fly autonomously from land or water airfield. The demonstrator was designed for a 1-hour duration and 1-mile telemetry range. A sizing code was used to design the smallest demonstrator UAV to achieve these goals. The final design was a six-foot wingspan, twin hull configuration that distributes the cargo weight across the span, reducing the wing structural weight. The demonstrator airframe was constructed from balsa wood, fiberglass, and plywood. A 4-stroke model airplane engine powered by methanol fuel was mounted in a pylon above the wing and powers the ACAT UAV. Initial flight tests from land and water were conducted under manual radio control and confirmed the amphibious capability of the design. Flight avionics that were developed by MLB for production UAVs were installed in the ACAT demonstrator. The flight software was also enhanced to permit autonomous takeoff and landing from water. A complete autonomous flight from ahard runway was successfully completed on July 5, 2001 and consisted of a take-off, rectangular flight pattern, and landing under complete computer control. A completely autonomous flight that featured a water takeoff and landing was completed on October 4, 2001. This report describes these activities in detail and highlights the challenges encountered and solved during the development of the ACAT demonstrator. hard runway was successfully completed on July 5, 2001 and consisted of a take-off, rectangular flight pattern, and landing under complete computer control. A completely autonomous flight that featured a water takeoff and landing was completed on October 4, 2001. This report describes these activities in detail and highlights the challenges encountered and solved during the development of the ACAT demonstrator.
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the top level of the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
Reamer, Lisa A; Haller, Rachel L; Thiele, Erica J; Freeman, Hani D; Lambeth, Susan P; Schapiro, Steven J
2014-01-01
Type 2 diabetes can be a problem for captive chimpanzees. Accurate blood glucose (BG) readings are necessary to monitor and treat this disease. Thus, obtaining voluntary samples from primates through positive reinforcement training (PRT) is critical. The current study assessed the voluntary participation of 123 chimpanzees in BG sampling and investigated factors that may contribute to individual success. All subjects participate in regular PRT sessions as part of a comprehensive behavioral management program. Basic steps involved in obtaining BG values include: voluntarily presenting a finger/toe; allowing digit disinfection; holding for the lancet device; and allowing blood collection onto a glucometer test strip for analysis. We recorded the level of participation (none, partial, or complete) when each chimpanzee was first asked to perform the testing procedure. Nearly 30% of subjects allowed the entire procedure in one session, without any prior specific training for the target behavior. Factors that affected this initial successful BG testing included sex, personality (chimpanzees rated higher on the factor "openness" were more likely to participate with BG testing), and past training performance for "present-for-injection" (chimpanzees that presented for their most recent anesthetic injection were more likely to participate). Neither age, rearing history, time since most recent anesthetic event nor social group size significantly affected initial training success. These results have important implications for captive management and training program success, underlining individual differences in training aptitude and the need for developing individual management plans in order to provide optimal care and treatment for diabetic chimpanzees in captivity. © 2014 Wiley Periodicals, Inc.
Compounding diagnostic delays: a qualitative study of point-of-care testing in South Africa.
Engel, Nora; Davids, Malika; Blankvoort, Nadine; Pai, Nitika Pant; Dheda, Keertan; Pai, Madhukar
2015-04-01
Successful point-of-care (POC) testing (completion of test-and-treat cycle in one patient encounter) has immense potential to reduce diagnostic and treatment delays, and improve patient and public health outcomes. We explored what tests are done and how in public/private, rural/urban hospitals and clinics in South Africa and whether they can ensure successful POC testing. This qualitative research study examined POC testing across major diseases in Cape Town, Durban and Eastern Cape. We conducted 101 semi-structured interviews and seven focus group discussions with doctors, nurses, community health workers, patients, laboratory technicians, policymakers, hospital managers and diagnostic manufacturers. In South Africa, diagnostics are characterised by a centralised system. Most tests conducted on the spot can be made to work successfully as POC tests. The majority of public/private clinics and smaller hospitals send samples via couriers to centralised laboratories and retrieve results the same way, via internet, fax or phone. The main challenge to POC testing lies in transporting samples and results, while delays risk patient loss from diagnostic/treatment pathways. Strategies to deal with associated delays create new problems, such as artificially prolonged turnaround times, strains on human resources and quality of testing, compounding additional diagnostic and treatment delays. For POC testing to succeed, particular characteristics of diagnostic ecosystems and adaptations of professional practices to overcome associated challenges must be taken into account. © 2014 John Wiley & Sons Ltd.
Global Positioning System III (GPS III)
2015-12-01
Vacuum (TVAC) testing on October 12, 2015, and successfully completed baseline TVAC testing on December 23, 2015 – a major system- level event...0.0 0.0 Total 4142.9 5285.2 N/A 5180.4 4269.8 5650.1 5557.4 Current APB Cost Estimate Reference SCP dated July 02, 2015 Confidence Level Confidence... Level of cost estimate for current APB: 60% The current APB is established at the 60% confidence level . This estimate is built upon the February 2015
NASA Technical Reports Server (NTRS)
Yun, Gunjin; Abdullah, A. B. M.; Binienda, Wieslaw; Krause, David L.; Kalluri, Sreeramesh
2014-01-01
A vibration-based testing methodology has been developed that will assess fatigue behavior of the metallic material of construction for the Advanced Stirling Convertor displacer (planar) spring component. To minimize the testing duration, the test setup is designed for base-excitation of a multiplespecimen arrangement, driven in a high-frequency resonant mode; this allows completion of fatigue testing in an accelerated period. A high performance electro-dynamic exciter (shaker) is used to generate harmonic oscillation of cantilever beam specimens, which are clasped on the shaker armature with specially-designed clamp fixtures. The shaker operates in closed-loop control with dynamic specimen response feedback provided by a scanning laser vibrometer. A test coordinator function synchronizes the shaker controller and the laser vibrometer to complete the closed-loop scheme. The test coordinator also monitors structural health of the test specimens throughout the test period, recognizing any change in specimen dynamic behavior. As this may be due to fatigue crack initiation, the test coordinator terminates test progression and then acquires test data in an orderly manner. Design of the specimen and fixture geometry was completed by finite element analysis such that peak stress does not occur at the clamping fixture attachment points. Experimental stress evaluation was conducted to verify the specimen stress predictions. A successful application of the experimental methodology was demonstrated by validation tests with carbon steel specimens subjected to fully-reversed bending stress; high-cycle fatigue failures were induced in such specimens using higher-than-prototypical stresses
DOE Office of Scientific and Technical Information (OSTI.GOV)
Callow, R.A.; Weidner, J.R.; Loehr, C.A.
This report describes two in situ vitrification field tests conducted on simulated buried waste pits during June and July 1990 at the Idaho National Engineering Laboratory. In situ vitrification, an emerging technology for in place conversion of contaminated soils into a durable glass and crystalline waste form, is being investigated as a potential remediation technology for buried waste. The overall objective of the two tests was to access the general suitability of the process to remediate waste structures representative of buried waste found at Idaho National Engineering Laboratory. In particular, these tests, as part of a treatability study, were designedmore » to provide essential information on the field performance of the process under conditions of significant combustible and metal wastes and to test a newly developed electrode feed technology. The tests were successfully completed, and the electrode feed technology successfully processed the high metal content waste. Test results indicate the process is a feasible technology for application to buried waste. 33 refs., 109 figs., 39 tabs.« less
Testing of the 3M Company Composite Conductor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stovall, John P; Rizy, D Tom; Kisner, Roger A
2010-10-01
The 3M Company has developed a high-temperature low-sag conductor referred to as Aluminum-Conductor Composite-Reinforced or ACCR. The conductor uses an aluminum metal matrix material to replace the steel in conventional conductors. The objective of this work is to accelerate the commercial acceptance by electric utilities of this new conductor design by testing four representative conductor classes in controlled conditions. A unique facility called the Powerline Conductor Accelerated Testing (PCAT) Facility was built at ORNL for testing overhead conductors. The PCAT has been uniquely designed for testing overhead bare transmission line conductors at high currents and temperatures after they have beenmore » installed and tensioned to the manufacturer's specifications. The ability to operate a transmission line conductor in this manner does not exist elsewhere in the United States. Four classes of ACCR cable designed by the 3M Company have been successfully test at ORNL small, medium, large and small/compact. Based on these and other manufacturer tests, the 3M Company has successfully introduced the ACCR into the commercial market and has completed over twenty installations for utility companies.« less
GO1 Inert Test Article Captive Carry
2018-01-10
Generation Orbit Launch Services, Inc. (GO) completed the GO1 Inert Test Article captive carry flight test at NASA’s Armstrong Flight Research Center in December. Under a public-private partnership with NASA, GO developed the GO1-ITA, a mass properties and outer mold line simulator for the GO1 hypersonic flight testbed and earned NASA airworthiness approval for flight on NASA’s C-20a. NASA’s C-20a was originally modified to add a centerline hard point to carry the Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) pod. Together with the NASA Armstrong team, a campaign of three flight tests was conducted, successfully completing all test objectives including clearing the operational flight envelope of the C-20a with the GO1-ITA mounted to the centerline hard point, and demonstrated the unique launch maneuver designed for air launch of the GO1 on operational flights starting in 2019. Data collected during the campaign will be used to validate models and inform the ongoing design and development of GO1.
An exploratory analysis of the model for understanding success in quality.
Kaplan, Heather C; Froehle, Craig M; Cassedy, Amy; Provost, Lloyd P; Margolis, Peter A
2013-01-01
Experience suggests that differences in context produce variability in the effectiveness of quality improvement (QI) interventions. However, little is known about which contextual factors affect success or how they exert influence. Using the Model for Understanding Success in Quality (MUSIQ), we perform exploratory quantitative tests of the role of context in QI success. We used a cross-sectional design to survey individuals participating in QI projects in three settings: a pediatric hospital, hospitals affiliated with a state QI collaborative, and organizations sponsoring participants in an improvement advisor training program. Individuals participating in QI projects completed a questionnaire assessing contextual factors included in MUSIQ and measures of perceived success. Path analysis was used to test the direct, indirect, and total effects of context variables on QI success as hypothesized in MUSIQ. In the 74 projects studied, most contextual factors in MUSIQ were found to be significantly related to at least one QI project performance outcome. Contextual factors exhibiting significant effects on two measures of perceived QI success included resource availability, QI team leadership, team QI skills, microsystem motivation, microsystem QI culture, and microsystem QI capability. There was weaker evidence for effects of senior leader project sponsors, organizational QI culture, QI team decision-making, and microsystem QI leadership. These initial tests add to the validity of MUSIQ as a tool for identifying which contextual factors affect improvement success and understanding how they exert influence. Using MUSIQ, managers and QI practitioners can begin to identify aspects of context that must be addressed before or during the execution of QI projects and plan strategies to modify context for increased success. Additional work by QI researchers to improve the theory, refine measurement approaches, and validate MUSIQ as a predictive tool in a wider range of QI efforts is necessary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Kyung-Doo; Jeong, Jae-Jun; Lee, Seung-Wook
The Nuclear Steam Supply System (NSSS) thermal-hydraulic model adopted in the Korea Nuclear Plant Education Center (KNPEC)-2 simulator was provided in the early 1980s. The reference plant for KNPEC-2 is the Yong Gwang Nuclear Unit 1, which is a Westinghouse-type 3-loop, 950 MW(electric) pressurized water reactor. Because of the limited computational capability at that time, it uses overly simplified physical models and assumptions for a real-time simulation of NSSS thermal-hydraulic transients. This may entail inaccurate results and thus, the possibility of so-called ''negative training,'' especially for complicated two-phase flows in the reactor coolant system. To resolve the problem, we developedmore » a realistic NSSS thermal-hydraulic program (named ARTS code) based on the best-estimate code RETRAN-3D. The systematic assessment of ARTS has been conducted by both a stand-alone test and an integrated test in the simulator environment. The non-integrated stand-alone test (NIST) results were reasonable in terms of accuracy, real-time simulation capability, and robustness. After successful completion of the NIST, ARTS was integrated with a 3-D reactor kinetics model and other system models. The site acceptance test (SAT) has been completed successively and confirmed to comply with the ANSI/ANS-3.5-1998 simulator software performance criteria. This paper presents our efforts for the ARTS development and some test results of the NIST and SAT.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janke, Christopher James; Das, Sadananda; Oyola, Yatsandra
2014-08-01
This report describes work on the successful completion of Milestone M2FT-14OR03100115 (8/20/2014) entitled, “Complete new adsorbent materials for marine testing to demonstrate 4.5 g-U/kg adsorbent”. This effort is part of the Seawater Uranium Recovery Program, sponsored by the U.S. Department of Energy, Office of Nuclear Energy, and involved the development of new adsorbent materials at the Oak Ridge National Laboratory (ORNL) and marine testing at the Pacific Northwest National Laboratory (PNNL). ORNL has recently developed two new families of fiber adsorbents that have demonstrated uranium adsorption capacities greater than 4.5 g-U/kg adsorbent after marine testing at PNNL. One adsorbent wasmore » synthesized by radiation-induced graft polymerization of itaconic acid and acrylonitrile onto high surface area polyethylene fibers followed by amidoximation and base conditioning. This fiber showed a capacity of 4.6 g-U/kg adsorbent in marine testing at PNNL. The second adsorbent was prepared by atom-transfer radical polymerization of t-butyl acrylate and acrylonitrile onto halide-functionalized round fibers followed by amidoximation and base hydrolysis. This fiber demonstrated uranium adsorption capacity of 5.4 g-U/kg adsorbent in marine testing at PNNL.« less
Status of NASA's Space Launch System
NASA Technical Reports Server (NTRS)
Honeycutt, John; Lyles, Garry
2016-01-01
NASA's Space Launch System (SLS) continued to make significant progress in 2015 and 2016, completing hardware and testing that brings NASA closer to a new era of deep space exploration. Programmatically, SLS completed Critical Design Review (CDR) in 2015. A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just five years after program start, every major element has amassed development and flight hardware and completed key tests that will lead to an accelerated pace of manufacturing and testing in 2016 and 2017. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The existing fleet of RS-25 engines is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with a fifth propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major 2015-2016 accomplishments were two booster qualification hotfire tests, a series of RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the completion of welding for all qualification and flight EM-1 core stage components and testing of flight avionics, completion of core stage structural test stands, casting of the EM-1 solid rocket motors, additional testing of RS-25 engines and flight engine controllers This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.
Fos, Peter J; Lee, Jae Eun; Sung, Jung Hye; Zuniga, Miguel A; Amy, Brian W
2005-01-01
This study describes Mississippi's statewide latent tuberculosis infection (LTBI) control management efforts to improve treatment outcomes using scientific quality improvement tools. LTBI medication completion rates were observed by month and by nine administrative health districts for a 12-month period. Analysis of variance (ANOVA) was conducted to see if there was any significant change between preintervention and postintervention in medication completion rates. Regression analysis was performed to test the linearity of change across the monthly rates. A change from a rate of 79.7 percent to 90.5 percent completion of the LTBI medication regimen was observed after the quality improvement intervention was instituted. During the quality improvement intervention, the mean reached 96.5 percent completion, followed by a slight decline at the end of the intervention to 90.5 percent. The analysis revealed that the mean LTBI medication completion rate across the nine administrative health districts was significantly increased and variability was decreased across all administrative health districts, with minor exceptions. A quality improvement team approach was shown to be effective in disease management by increasing LTBI medication completion. New baseline expectations can be established when quality improvement initiatives are implemented. This success can be linked, in part, to the use of scientific methods, precise and valid data, persuasive and clear goal setting, appropriate feedback, and ongoing monitoring.
Vella, M; Nellist, E; Cardozo, L; Mastoroudes, H; Giarenis, I; Duckett, J
2013-11-01
Pelvic floor muscle training (PFMT) is the recommended first-line treatment for women with urinary incontinence (UI). Success rates are variable and dependent on a number of factors. The development of an incontinence treatment motivation questionnaire (ITMQ) provides us with a tool to assess patient self-motivation with respect to PFMT and UI. The aim of this study was to determine the effect of women's self-motivation to perform PFMT on outcome. Women with stress predominant UI completed an ITMQ and a 24-h pad test and then underwent a 12-week course of supervised PFMT. At the end of their treatment they completed a patient global impression of improvement questionnaire (PGI-I) and a second 24-h pad test. The PGI-I scores and the difference in pad test weight correlated with the ITMQ according to Spearman's correlation coefficient. Sixty-five women were recruited. Thirty-two (49%) patients perceived themselves as having improved, 28 women (43%) did not experience any change in symptoms and 5 women (8%) felt that their symptoms deteriorated following treatment. When correlating the PGI-I with the ITMQ, 3 of the 5 domains: MQS1 (positive attitude for treatment; p = 0.003), MQS3 (frustration of living with incontinence; p = 0.002) and MQS4 (desire for treatment; p = 0.002) correlated significantly with outcome. Desire for treatment was the only domain to correlate with change in pad weight (p = 0.001). Self-motivation is essential in order to determine improved success rates with PFMT.
Grov, Christian; Cain, Demetria; Whitfield, Thomas H. F.; Rendina, H. Jonathon; Pawson, Mark; Ventuneac, Ana; Parsons, Jeffrey T.
2015-01-01
We describe enrollment for the One Thousand Strong panel, present characteristics of the panel relative to other large U.S. national studies of gay and bisexual men (GBM), and examine demographic and behavioral characteristics that were associated with passing enrollment milestones. A U.S. national sample of HIV-negative men were enrolled via an established online panel of over 22,000 GBM. Participants (n = 1071) passed three milestones to join our panel. Milestone 1 was screening eligible and providing informed consent. Milestone 2 involved completing an hour-long at-home computer-assisted self-interview (CASI) survey. Milestone 3 involved completing at-home self-administered rapid HIV testing and collecting/returning urine and rectal samples for gonorrhea and chlamydia testing. Compared to those who completed milestones: those not passing milestone 1 were more likely to be non-White and older; those not passing milestone 2 were less likely to have insurance or a primary care physician; and those not passing milestone 3 were less educated, more likely to be bisexual as opposed to gay, more likely to live in the Midwest, had fewer male partners in the past year, and less likely to have tested for HIV in the past year. Effect sizes for significant findings were small. We successfully enrolled a national sample of HIV-negative GBM who completed at-home CASI assessments and at-home self-administered HIV and urine and rectal STI testing. This indicates high feasibility and acceptability of incorporating self-administered biological assays into otherwise fully online studies. Differences in completion of study milestones indicate a need for further investigation into the reasons for lower engagement by certain groups. PMID:26858776
Training Social Cognition: From Imitation to Theory of Mind
ERIC Educational Resources Information Center
Santiesteban, Idalmis; White, Sarah; Cook, Jennifer; Gilbert, Sam J.; Heyes, Cecilia; Bird, Geoffrey
2012-01-01
Evidence for successful socio-cognitive training in typical adults is rare. This study attempted to improve Theory of Mind (ToM) and visual perspective taking in healthy adults by training participants to either imitate or to inhibit imitation. Twenty-four hours after training, all participants completed tests of ToM and visual perspective taking.…
Beyond Remediation: Monitoring Progress and Promoting Success.
ERIC Educational Resources Information Center
Pudelka, Pam; Macha, Becky
The Texas Academic Skills Program (TASP), enacted into law in the fall of 1989, was designed to insure that public college students in Texas would have the basic skills necessary to perform in college-level courses. The TASP law requires that students be tested prior to completing 9 or 15 semester hours of college-level work. The law also requires…
ERIC Educational Resources Information Center
Lin, Wei-Liang; Cheng, Wang-Chuan; Wu, Chen-Hao; Wu, Hai-Ming; Wu, Chang-Yu; Ho, Kuan-Hsuan; Chan, Chueh-An
2010-01-01
This work describes a novel, first-year graduate-level analog integrated circuit (IC) design course. The course teaches students analog circuit design; an external manufacturer then produces their designs in three different silicon chips. The students, working in pairs, then test these chips to verify their success. All work is completed within…
ERIC Educational Resources Information Center
Rice, Kenneth G.; Leever, Brooke A.; Christopher, John; Porter, J. Diane
2006-01-01
This study tested models of perfectionism predicting psychological distress and academic adjustment and moderators and mediators of those associations in 2 successive cohorts of high-achieving university honors students (N = 499). Participants completed measures earl and late in the semester. Adaptive (high standards) and maladaptive…
Defense Science and Technology RELIANCE. Defense Technology Objectives Success Stories
2001-03-01
27 MD.04 Medical Countermeasures for Botulinum Toxin ...flexibility of U.S. forces. Completed. 1998 SPONSORS DoD Chemical and Biological Defense Program MEDICAL COUNTERMEASURES FOR BOTULINUM TOXIN (MD.04) 29...system operates satisfactorily against a high-level jamming environment in the target area. On four AGTFT free flights, the AGTFT flight test vehicles
Results of the 1987 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Anspaugh, B. E.; Weiss, R. S.
1987-01-01
The 1987 solar cell calibration balloon flight was successfully completed on August 23, 1987, meeting all objectives of the program. Forty-eight modules were carried to an altitude of 120,000 ft (36.0 km). The cells calibrated can now be used as reference standards in simulator testing of cells and arrays.
Results of the 1988 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Anspaugh, B. E.; Weiss, R. S.
1988-01-01
The 1988 solar cell calibration balloon flight was successfully completed on August 7, 1988, meeting all objectives of the program. Forty-eight modules were carried to an altitude of 118,000 ft (36.0 km). The calibrated cells can now be used as reference standards in simulator testing of cells and arrays.
Results of the 1989 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Anspaugh, B. E.; Weiss, R. S.
1989-01-01
The 1989 solar cell calibration balloon flight was successfully completed on August 9, 1989, meeting all objectives of the program. Forty-two modules were carried to an altitude of 118,000 ft (36.0 km). The calibrated cells can now be used as reference standards in simulator testing of cells and arrays.
Results of the 1985 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Anspaugh, B. E.; Weiss, R. S.
1986-01-01
The 1985 solar cell calibration balloon flight was successfully completed on July 12, 1985, meeting all objectives of the program. Fifty-seven modules were carried to an altitude of 115,000 ft (35.0 km). The calibrated cells can now be used as reference standards in simulator testing of cells and arrays.
USDA-ARS?s Scientific Manuscript database
Current cucumber pickling practices differ significantly from those in the 1940s, when most of the microbiological studies of cucumber fermentations were completed, using culture dependent and biochemical testing. It is the objective of this study to conduct a compositional re-assessment of the micr...
Prediction of Readiness in Kindergarten and Achievement in the First Primary Year. Study Number Two.
ERIC Educational Resources Information Center
University City School District, MO.
A 4-year United States Office of Education prekindergarten-kindergarten series of research studies has provided data useful in predicting school success. The present study compares test scores of the Complete Assessment Battery administered before the children entered kindergarten with scores of the same children on the Metropolitan Readiness…
Using Norm-Based Appeals to Increase Response Rates in Evaluation Research: A Field Experiment
ERIC Educational Resources Information Center
Misra, Shalini; Stokols, Daniel; Marino, Anne Heberger
2012-01-01
A field experiment was conducted to test the effectiveness of norm-based persuasive messages for increasing response rates in online survey research. Participants in an interdisciplinary conference were asked to complete two successive postconference surveys and randomly assigned to one of two groups at each time point. The experimental group…
Predicting Success among Prospective Disadvantaged Students in Natural Scientific Fields
ERIC Educational Resources Information Center
Maree, J. G.; Fletcher, L.; Sommerville, J.
2011-01-01
One hundred and fifty-nine Grade 11 prospective disadvantaged students in the natural sciences at the University of Pretoria completed the Study Orientation Questionnaire in Mathematics and the Senior Aptitude Test (Advanced). Fifty-nine male students (M age = 16.05; SD = 0.57) and 100 females (M age = 16.02; SD = 0.512) scored significantly…
Code of Federal Regulations, 2012 CFR
2012-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2013 CFR
2013-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2011 CFR
2011-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2010 CFR
2010-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
Code of Federal Regulations, 2014 CFR
2014-10-01
... determining the qualifications of each person it permits or requires to operate a locomotive. In designing its...) for train control that are employed, the operational design characteristics of the track and equipment... completion of a course of study, or successful passage of a standardized testing program, the submission must...
ERIC Educational Resources Information Center
Bettinger, Eric P.
2010-01-01
Policymakers and academics are increasingly interested in applying financial incentives to individuals in education. This paper presents evidence from a pay for performance program taking place in Coshocton, Ohio. Since 2004, Coshocton has provided cash payments to students in grades three through six for successful completion of their…
Self-Affirmation Theory and Performance Feedback: When Scoring High Makes You Feel Low.
Velez, John A; Hanus, Michael D
2016-12-01
Video games have a wide variety of benefits for players. The current study examines how video games can also increase players' willingness to internalize important but threatening self-information. Research suggests that negative information regarding a valued self-image evokes defensive strategies aimed at dismissing or discrediting the source of information. Self-Affirmation Theory proposes that affirming or bolstering an important self-image unrelated to the previous threat can be an effective strategy for reducing defensiveness. Participants in the current study completed a fictitious intelligence test and received negative or no feedback, followed by 15 minutes of video game play that resulted in positive or no feedback. Results suggest that participants who valued video game success as part of their identity exhibited less defensive strategies in the form of increased test credibility ratings and lower self-perceptions of intelligence. This suggests that performing well on a video game is an affirmational resource for players whose identities are contingent upon such success. However, results also indicate that players who did not value video game success but received positive video game feedback exhibited more defensive reactions to the negative intelligence test feedback. This suggests that while players who value video game success as part of their identity may reap benefits from video game play after a self-threat, those who do not value such success may experience more harmful effects.
Designing and Implementation of a Course on Successful Dental Practice for Dentists
Safi, Yaser; Razeghi, Samaneh; Shamloo, Nafiseh; Soroush, Mahdi; Akhgari, Ensieh; Moscowchi, Anahita
2015-01-01
Objectives: We aimed to design, implement and evaluate the efficacy of a comprehensive course on non-clinical competencies that dentists must possess for a successful dental practice. Materials and Methods: In this interventional before-after study an expert panel of five academic staff members and five general practitioners derived the topics for a course on successful dental practice, and aggregated them in the form of a two-day course. It was held for 46 randomly selected dentists in January 2010, at the School of Dentistry, Tehran University of Medical Sciences. The participants completed an anonymous questionnaire asking about their self-perceived need to receive training in each of the proposed topics and their self-assessed knowledge about each topic before and after attending the course. Results: Participants gave a higher priority to the necessity of training on “ergonomics and professional health” and communication skills in post-test compared to pre-test (P<0.05). The self-assessed knowledge of dentists improved significantly after attending the course in seven domains: ergonomics and occupational health, workplace design, documentation principles and IT applications in dentistry, national rules and regulations of dental practice, medical emergencies, dental ethics and communication skills (P<0.05). More than 70% of the participants were completely satisfied or satisfied with practical implication of the course, conformity of the contents with the title and course settings. Conclusion: The designed course seemed to be successful in revealing the need of participants for further education. Considering the high satisfaction rate of the attendants, this course can serve as a model for continuing education purposes. PMID:26884779
Investigation of electroforming techniques. [fabrication of regeneratively cooled thrust chambers
NASA Technical Reports Server (NTRS)
Malone, G. A.
1975-01-01
Copper and nickel electroforming was examined for the purpose of establishing the necessary processes and procedures for repeatable, successful fabrication of the outer structures of regeneratively cooled thrust chambers. The selection of electrolytes for copper and nickel deposition is described. The development studies performed to refine and complete the processes necessary for successful chamber shell fabrication and the testing employed to verify the applicability of the processes and procedures to small scale hardware are described. Specifications were developed to afford a guideline for the electroforming of high quality outer shells on regeneratively cooled thrust chamber liners. Test results indicated repeatable mechanical properties could be produced in copper deposits from the copper sulfate electrolyte with periodic current reversal and in nickel deposits from the sulfamate solution. Use of inert, removable channel fillers and the conductivizing of such is described. Techniques (verified by test) which produce high integrity bonds to copper and copper alloy liners are discussed.
A Cascade Optimization Strategy for Solution of Difficult Multidisciplinary Design Problems
NASA Technical Reports Server (NTRS)
Patnaik, Surya N.; Coroneos, Rula M.; Hopkins, Dale A.; Berke, Laszlo
1996-01-01
A research project to comparatively evaluate 10 nonlinear optimization algorithms was recently completed. A conclusion was that no single optimizer could successfully solve all 40 problems in the test bed, even though most optimizers successfully solved at least one-third of the problems. We realized that improved search directions and step lengths, available in the 10 optimizers compared, were not likely to alleviate the convergence difficulties. For the solution of those difficult problems we have devised an alternative approach called cascade optimization strategy. The cascade strategy uses several optimizers, one followed by another in a specified sequence, to solve a problem. A pseudorandom scheme perturbs design variables between the optimizers. The cascade strategy has been tested successfully in the design of supersonic and subsonic aircraft configurations and air-breathing engines for high-speed civil transport applications. These problems could not be successfully solved by an individual optimizer. The cascade optimization strategy, however, generated feasible optimum solutions for both aircraft and engine problems. This paper presents the cascade strategy and solutions to a number of these problems.
Cohall, Alwyn T; Dini, Sheila; Senathirajah, Yalini; Nye, Andrea; Neu, Natalie; Powell, Donald; Powell, Borris; Hyden, Christel
2008-01-01
Significant advances in the treatment of human immunodeficiency virus (HIV)/acquired immunodeficiency syndrome (AIDS) place a premium on early detection and linkage to care. Recognizing the need to efficiently yet comprehensively provide HIV counseling, we assessed the feasibility of using audio computer-assisted self-inventory (A-CASI) in a community-based HIV counseling and testing facility. A convenience sample of 50 adults presenting for HIV testing was recruited to complete an 85-item computerized HIV Assessment of Risk Inventory (HARI) containing domains of demographics, sexual behaviors, alcohol and substance use, emotional well-being, past experiences with HIV testing, and attitudes about taking HARI. Client acceptance rate was limited by the completion time outlined during the intake process. However, the majority of respondents who completed HARI felt that it took only a short to moderate time to complete and was easy to understand. A majority also reported a preference for using a computerized format in the future. Further, HARI identified a number of risk-taking behaviors, including unprotected anal sex and substance use prior to past sexual encounters. Additionally, more than half of the sample reported moderate to severe depressive symptoms. Those respondents who had time to complete the survey accepted the A-CASI interview, and it was successful at identifying a substantial level of risk-taking behaviors. A-CASI has the potential to guide HIV counselors in providing risk-reduction counseling and referral activities. However, results suggested the need to shorten the instrument, and further studies are needed to determine applicability in other HIV testing sites.
Waltz Mill testing of 345-kV PPP cable
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burghardt, R.R.
1991-09-01
A 345-kV PPP-insulated cable was subjected to a two-year accelerated life test program at the EPRI Waltz Mill Cable Test Facility. Testing started in November 1985 and was successfully completed in September 1988. The program included conductor temperatures ranging from 85{degrees}C to 105{degrees}C and line-to-line voltages from 362 kV to 474 kV. Cyclic testing was performed during 17 of the 24 months. Dissipation factor measurements were made throughout the program. The measurements indicated no deterioration of the cable or splices as a consequence of the high temperatures and voltages applied to them in this test program. 2 refs., 24 figs.
Waltz Mill testing of 765-kV paper-polypropylene-paper (PPP) cable. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burghardt, R.R.
1992-06-01
A 765-kV PPP-insulated cable was subjected to a 27-month accelerated life test program at the EPRI Waltz Mill Cable Test Facility. Testing started in August 1981 and was successfully completed in January 1985. The program included conductor temperatures ranging from 85{degree}C to 105{degree}C and line-to-line voltages from 800 kV to 1050 kV. Cyclic testing was performed during 20 of the 27 months. Dissipation factor measurements were made throughout the program. The measurements indicated no deterioration of the cable or splices as a consequence of the high temperatures and voltages applied to them in this test program.
Waltz Mill testing of 765-kV paper-polypropylene-paper (PPP) cable
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burghardt, R.R.
1992-06-01
A 765-kV PPP-insulated cable was subjected to a 27-month accelerated life test program at the EPRI Waltz Mill Cable Test Facility. Testing started in August 1981 and was successfully completed in January 1985. The program included conductor temperatures ranging from 85{degree}C to 105{degree}C and line-to-line voltages from 800 kV to 1050 kV. Cyclic testing was performed during 20 of the 27 months. Dissipation factor measurements were made throughout the program. The measurements indicated no deterioration of the cable or splices as a consequence of the high temperatures and voltages applied to them in this test program.
Rocket Propulsion 21 Steering Committee Meeting (RP21) NASA In-Space Propulsion Update
NASA Technical Reports Server (NTRS)
Klem, Mark
2015-01-01
In-house Support of NEXT-C Contract Status Thruster NEXT Long Duration Test post-test destructive evaluation in progress Findings will be used to verify service life models identify potential design improvements Cathode heater fabrication initiated for cyclic life testing Thruster operating algorithm definition verification initiated to provide operating procedures for mission users High voltage propellant isolator life test voluntarily terminated after successfully operating 51,200 h Power processor unit (PPU) Replaced all problematic stacked multilayer ceramic dual inline pin capacitors within PPU Test bed Rebuilt installed discharge power supply primary power board Completed full functional performance characterization Final test report in progress Transferred PPU Testbed to contractor to support prototype design effort.
Development of a metallic bellows expulsion device for fluorine service
NASA Technical Reports Server (NTRS)
Fearn, R. F.
1971-01-01
A complete expulsion device was designed, fabricated, and tested in accordance with requirements specified by NASA to demonstrate the feasibility of using metallic bellows to expel liquid fluorine. Difficulties were experienced in obtaining leaktight welds at the bellows end terminals, but eventually three assemblies were successfully fabricted and cycle tested, one in LN2, two in LF2. The bellows performed well, except that they failed prematurely in LF2, apparently the result of small initiator cracks in the seam welds of the bellows.
Engel, Nora; Ganesh, Gayatri; Patil, Mamata; Yellappa, Vijayashree; Pant Pai, Nitika; Vadnais, Caroline; Pai, Madhukar
2015-01-01
Background Successful point-of-care testing, namely ensuring the completion of the test and treat cycle in the same encounter, has immense potential to reduce diagnostic and treatment delays, and impact patient outcomes. However, having rapid tests is not enough, as many barriers may prevent their successful implementation in point-of-care testing programs. Qualitative research on diagnostic practices may help identify such barriers across different points of care in health systems. Methods In this exploratory qualitative study, we conducted 78 semi-structured interviews and 13 focus group discussions in an urban and rural area of Karnataka, India, with healthcare providers (doctors, nurses, specialists, traditional healers, and informal providers), patients, community health workers, test manufacturers, laboratory technicians, program managers and policy-makers. Participants were purposively sampled to represent settings of hospitals, peripheral labs, clinics, communities and homes, in both the public and private sectors. Results In the Indian context, the onus is on the patient to ensure successful point-of-care testing across homes, clinics, labs and hospitals, amidst uncoordinated providers with divergent and often competing practices, in settings lacking material, money and human resources. We identified three overarching themes affecting point-of-care testing: the main theme is ‘relationships’ among providers and between providers and patients, influenced by the cross-cutting theme of ‘infrastructure’. Challenges with both result in ‘modified practices’ often favouring empirical (symptomatic) treatment over treatment guided by testing. Conclusions Even if tests can be conducted on the spot and infrastructure challenges have been resolved, relationships among providers and between patients and providers are crucial for successful point-of-care testing. Furthermore, these barriers do not act in isolation, but are interlinked and need to be examined as such. Also, a test alone has only limited power to overcome those difficulties. Test developers, policy-makers, healthcare providers and funders need to use these insights in overcoming barriers to point-of-care testing programs. PMID:26275231
Ceramic applications in turbine engines
NASA Technical Reports Server (NTRS)
Byrd, J. A.; Janovicz, M. A.; Thrasher, S. R.
1981-01-01
Development testing activities on the 1900 F-configuration ceramic parts were completed, 2070 F-configuration ceramic component rig and engine testing was initiated, and the conceptual design for the 2265 F-configuration engine was identified. Fabrication of the 2070 F-configuration ceramic parts continued, along with burner rig development testing of the 2070 F-configuration metal combustor in preparation for 1132 C (2070 F) qualification test conditions. Shakedown testing of the hot engine simulator (HES) rig was also completed in preparation for testing of a spin rig-qualified ceramic-bladed rotor assembly at 1132 C (2070 F) test conditions. Concurrently, ceramics from new sources and alternate materials continued to be evaluated, and fabrication of 2070 F-configuration ceramic component from these new sources continued. Cold spin testing of the critical 2070 F-configuration blade continued in the spin test rig to qualify a set of ceramic blades at 117% engine speed for the gasifier turbine rotor. Rig testing of the ceramic-bladed gasifier turbine rotor assembly at 108% engine speed was also performed, which resulted in the failure of one blade. The new three-piece hot seal with the nickel oxide/calcium fluoride wearface composition was qualified in the regenerator rig and introduced to engine operation wiwth marginal success.
Effect of posterior tibial tendon dysfunction on unipedal standing balance test.
Kulig, Kornelia; Lee, Szu-Ping; Reischl, Stephen F; Noceti-DeWit, Lisa
2015-01-01
Foot pain and diminished functional capacity are characteristics of tibialis posterior tendon dysfunction (TPTD). This study tested the hypotheses that women with TPTD would have impaired performance of a unipedal standing balance test (USBT) and that balance performance would be related to the number of single limb heel raises (SLHR). Thirty-nine middle-aged women, 19 with early stage TPTD (stage I and II), were instructed to perform 2 tasks; a USBT and repeated SLHR. Balance success was defined as a 10-second stance. For those who were successful, center of pressure (COP) data in anterior-posterior (AP) and medial-lateral (ML) directions were recorded as a measure of postural sway. SLHR performance was divided into 3 bins (≤2; 3-9 and > 10 repetitions). The between-balance success on performing the SLHR test was analyzed using the Fisher's exact test (2 × 3). Independent t tests were used to compare between-group differences in postural sway. Relationship of postural sway to the number of heel raises was assessed using Spearman's rho. The success rate of the USBT was significantly lower in women with TPTD than the controls (47% vs 85%, P = .041). In addition, women with TPTD who completed the USBT exhibited increased AP COP displacement (14.0 ± 7.4 vs 8.4 ± 1.3 mm, P = .008), and a strong trend of increased ML COP displacement (8.3 ± 4.5 vs 6.1 ± 1.2 mm, P = .050). The success rate of USBT was correlated with the number of SLHR (P = .01). The AP and ML COP displacement were correlated with SLHR (r = -.538 and .495), respectively. Women with TPTD have difficulty in performing the USBT. Performance of the USBT and SLHR are highly correlated and predictive of each other. A unipedal balance test may be used as a proxy TPTD assessment tool to the heel raising test when pain prevents performance. Level III, case control study. © The Author(s) 2014.
Fassunke, Jana; Ihle, Michaela Angelika; Lenze, Dido; Lehmann, Annika; Hummel, Michael; Vollbrecht, Claudia; Penzel, Roland; Volckmar, Anna-Lena; Stenzinger, Albrecht; Endris, Volker; Jung, Andreas; Lehmann, Ulrich; Zeugner, Silke; Baretton, Gustavo; Kreipe, Hans; Schirmacher, Peter; Kirchner, Thomas; Dietel, Manfred; Büttner, Reinhard; Merkelbach-Bruse, Sabine
2017-10-01
The European Commision (EC) recently approved osimertinib for the treatment of adult patients with locally advanced or metastatic non-small-cell lung cancer (NSCLC) harboring EGFR T790M mutations. Besides tissue-based testing, blood samples containing cell-free circulating tumor DNA (ctDNA) can be used to interrogate T790M status. Herein, we describe the conditions and results of a round robin trial (RRT) for T790M mutation testing in NSCLC tissue specimens and peripheral blood samples spiked with cell line DNA mimicking tumor-derived ctDNA. The underlying objectives of this two-staged external quality assessment (EQA) approach were (a) to evaluate the accuracy of T790M mutations testing across multiple centers and (b) to investigate if a liquid biopsy-based testing for T790M mutations in spiked blood samples is feasible in routine diagnostic. Based on a successfully completed internal phase I RRT, an open RRT for EGFR T790M mutation testing in tumor tissue and blood samples was initiated. In total, 48 pathology centers participated in the EQA. Of these, 47 (97.9%) centers submitted their analyses within the pre-defined time frame and 44 (tissue), respectively, 40 (plasma) successfully passed the test. The overall success rates in the RRT phase II were 91.7% (tissue) and 83.3% (blood), respectively. Thirty-eight out of 48 participants (79.2%) successfully passed both parts of the RRT. The RRT for blood-based EGFR testing initiated in Germany is, to the best of our knowledge, the first of his kind in Europe. In summary, our results demonstrate that blood-based genotyping for EGFR resistance mutations can be successfully integrated in routine molecular diagnostics complementing the array of molecular methods already available at pathology centers in Germany.
ERIC Educational Resources Information Center
Sung, Hung-En; Belenko, Steven
2005-01-01
A subset of criminal offenders diverted from prison to treatment return to crime after successful completion of treatment. Identifying correlates of recidivism among treatment completers will improve our ability to help treated offenders to better capitalize on their treatment experiences. Data from 156 mandated clients of long-term residential…
Clinical trials transparency and the Trial and Experimental Studies Transparency (TEST) act.
Logvinov, Ilana
2014-03-01
Clinical trial research is the cornerstone for successful advancement of medicine that provides hope for millions of people in the future. Full transparency in clinical trials may allow independent investigators to evaluate study designs, perform additional analysis of data, and potentially eliminate duplicate studies. Current regulatory system and publishers rely on investigators and pharmaceutical industries for complete and accurate reporting of results from completed clinical trials. Legislation seems to be the only way to enforce mandatory disclosure of results. The Trial and Experimental Studies Transparency (TEST) Act of 2012 was introduced to the legislators in the United States to promote greater transparency in research industry. Public safety and advancement of science are the driving forces for the proposed policy change. The TEST Act may benefit the society and researchers; however, there are major concerns with participants' privacy and intellectual property protection. Copyright © 2014 Elsevier Inc. All rights reserved.
Erosive burning research. [for solid-propellant rocket engines
NASA Technical Reports Server (NTRS)
Strand, L.; Yang, L. C.; Nguyen, M. H.; Cohen, N. S.
1986-01-01
A status report is given on the results for the completed tests in a series of motor firings being carried out to measure the effects of the parameters that are considered to most strongly influence the scaling to larger rocket motor sizes of the transition to/or threshold conditions for erosive burning rate augmentation. Propellant burning rates at locations along the axis of the test motors are measured with a newly developed plasma capacitance gauge technique. The measured results are compared with erosive-burning predictions from a supporting ballistics analysis. The completed motor firings have successfully demonstrated response to the designed test variables. The trends with varying propellant burning rate, chamber pressure, and mass flow rate are consistent with existing results, but no pronounced effect of surface roughness has been observed. Rather, the influence of propellant oxidizer particle size on erosive burning is through its effect on the base, no-corssflow burning rate.
Yeo, Si-Ning; Zainal, Hani; Tang, Catherine S; Tong, Eddie M; Ho, Cyrus S; Ho, Roger C
2017-08-02
There remains a paucity of research on control attribution and depression within Asian populations. This study examines: (1) Success/Failure condition as a moderator between depression and negative affect or shame, and (2) differences in control attribution between patients with depression and healthy controls in Singapore. Seventy one patients with depression and 71 healthy controls went through a digit-span memory task where they were randomized into either the Success or Failure condition. Participants in the Success condition had to memorize and recall 5-digit strings, while participants in the Failure condition did the same for 12-digit strings. They then completed self-report measures of negative affect, shame, and attribution of control. One-way ANCOVA was performed to examine task condition as a moderator of association between mental health status and post-task negative affect or shame. Test of simple effects was carried out on significant interactions. Sign test and Mann-Whitney U test were employed to investigate differences in attribution of control. Mental health status and Success/Failure condition had significant effects on reported negative affect and shame. Healthy controls reported less post-task negative affect and shame in the Success than in the Failure condition while patients with depression reported similar levels of post-task negative affect and shame in both conditions. However, these differences were not significant in the test of simple effects. In addition, healthy controls felt a stronger sense of personal control in success than in failure and were more likely to blame external factors in failure than in success. Conversely, patients with depression were more inclined to credit external factors in success than in failure and ascribed greater personal control in failure than in success. The results suggest that successful conditions may not necessitate the reduction of negative affect in Asians with depression, indicating possible cultural variation in affective states as a result of control attribution and the importance of attending to these variations in designing psychological intervention for Asians. Further studies are required to gather more evidence on control attributions in different contexts and study other cognitive mechanisms related to depression in the Asian population.
Coal Technology Program progress report, March 1976
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Shakedown tests of the bench-scale hydrocarbonization system were successfully completed. Wyodak coal was fed to the reactor at a rate of 9.9 lb/hr where it was hydrocarbonized at 1050/sup 0/F under 20-atm hydrogen pressure. Laboratory results including settling tests, bench-scale settling tests, and sample ageing tests were continued. Two of ten compounds tested with the laboratory-scale apparatus were effective in increasing settling rates of solids in Solvent Refined Coal unfiltered oil, but bench-scale tests failed to show any improvements in the settling rate over the untreated SRC-UFO. Analytical chemistry efforts involved the removal and concentration of organic components in by-productmore » waters from fossil fuel conversion processes. A sephadex gel is being used to achieve hydrophilic-lipophilic separations in organic mixtures as a step in the analysis of fossil fuel related materials. Engineering Evaluations of the Synthiol and Hydrocarbonization Processes continued with the Synthiol process flow diagrams, heat and material balances, and utilities requirements being completed. Inspection techniques were developed for wear- and process-resistant coatings. Orders were placed for the Incoloy 800 tubing and a smaller quantity of Inconel 600 tubing for the tube matrix in the coal-fueled MIUS fluidized bed. An engineering feasibility review of General Atomic's proposal to ERDA for a bench-scale test program on thermochemical water splitting for hydrogen production was completed. (auth)« less
2 kWe Solar Dynamic Ground Test Demonstration Project. Volume 1; Executive Summary
NASA Technical Reports Server (NTRS)
Alexander, Dennis
1997-01-01
The Solar Dynamic Ground Test Demonstration (SDGTD) successfully demonstrated a solar-powered closed Brayton cycle system in a relevant space thermal environment. In addition to meeting technical requirements the project was completed 4 months ahead of schedule and under budget. The following conclusions can be supported: 1. The component technology for solar dynamic closed Brayton cycle technology has clearly been demonstrated. 2. The thermal, optical, control, and electrical integration aspects of systems integration have also been successfully demonstrated. Physical integration aspects were not attempted as these tend to be driven primarily by mission-specific requirements. 3. System efficiency of greater than 15 percent (all losses fully accounted for) was demonstrated using equipment and designs which were not optimized. Some preexisting hardware was used to minimize cost and schedule. 4. Power generation of 2 kWe. 5. A NASA/industry team was developed that successfully worked together to accomplish project goals. The material presented in this report will show that the technology necessary to design and fabricate solar dynamic electrical power systems for space has been successfully developed and demonstrated. The data will further show that achieved results compare well with pretest predictions. The next step in the development of solar dynamic space power will be a flight test.
NASA Technical Reports Server (NTRS)
Yew, Calinda; Whitehouse, Paul; Lui, Yan; Banks, Kimberly
2016-01-01
JWST Integrated Science Instruments Module (ISIM) has completed its system-level testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered for integration with the Optical Telescope Element (OTE) after the successful verification of the system through a series of three cryo-vacuum (CV) tests. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. As JWST progressed through its CV testing campaign, deficiencies in the test configuration and support equipment were uncovered from one test to the next. Subsequent upgrades and modifications were implemented to improve the facility support capabilities required to achieve test requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.
Marshall Team Complete Testing for Lunar Atmosphere and Dust Environment Explorer
NASA Technical Reports Server (NTRS)
Swofford, Philip
2013-01-01
Dr. Huu Trinh and his team with the Propulsion Systems and Test Departments at Marshall Space Flight Center in Huntsville, Ala. successfully complete a simulated cold-flow test series on the propulsion system used for the Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft. NASA Ames Research Center, Moffett Field, Calif., is leading NASA s work on the development of the LADEE spacecraft, and the Marshall center is the program office for the project. The spacecraft, scheduled for launch this fall, will orbit the Moon and gather information about the lunar atmosphere, conditions near the surface of the Moon, and collect samples of lunar dust. A thorough understanding of these characteristics will address long-standing unknowns, and help scientists understand other planetary bodies as well. The test team at the Marshall center conducted the cold flow test to identify how the fluid flows through the propulsion system feed lines, especially during critical operation modes. The test data will be used to assist the LADEE team in identifying any potential flow issues in the propulsion system, and allow them to address and correct them in advance of the launch.
Titanium Aluminide Scramjet Inlet Flap Subelement Benchmark Tested
NASA Technical Reports Server (NTRS)
Krause, David L.; Draper, Susan L.
2005-01-01
A subelement-level ultimate strength test was completed successfully at the NASA Glenn Research Center (http://www.nasa.gov/glenn/) on a large gamma titanium aluminide (TiAl) inlet flap demonstration piece. The test subjected the part to prototypical stress conditions by using unique fixtures that allowed both loading and support points to be located remote to the part itself (see the photograph). The resulting configuration produced shear, moment, and the consequent stress topology proportional to the design point. The test was conducted at room temperature, a harsh condition for the material because of reduced available ductility. Still, the peak experimental load-carrying capability exceeded original predictions.
Experimental investigation of elastic mode control on a model of a transport aircraft
NASA Technical Reports Server (NTRS)
Abramovitz, M.; Heimbaugh, R. M.; Nomura, J. K.; Pearson, R. M.; Shirley, W. A.; Stringham, R. H.; Tescher, E. L.; Zoock, I. E.
1981-01-01
A 4.5 percent DC-10 derivative flexible model with active controls is fabricated, developed, and tested to investigate the ability to suppress flutter and reduce gust loads with active controlled surfaces. The model is analyzed and tested in both semispan and complete model configuration. Analytical methods are refined and control laws are developed and successfully tested on both versions of the model. A 15 to 25 percent increase in flutter speed due to the active system is demonstrated. The capability of an active control system to significantly reduce wing bending moments due to turbulence is demonstrated. Good correlation is obtained between test and analytical prediction.
Solar power satellite system definition study. Volume 4: Silicon solar cell annealing test, phase 1
NASA Technical Reports Server (NTRS)
Walker, F.
1979-01-01
Laser annealing tests were conducted on ten 50 micron cells. Two were control cells that were not irradiated. These showed no loss in output due to exposure to the laser. Two cells were broken in handling. Six cells were successfully tested. All cells tested without breakage showed some recovery. One cell was subjected to two cycles and showed recovery on both cycles. Cells that were moderately degraded appeared to recover more completely than those more severly degraded. Exposure times ranged from two to ten seconds at 500 degrees centigrade. There was some indication that longer exposure was beneficial.
Primer development to obtain complete coding sequence of HA and NA genes of influenza A/H3N2 virus.
Agustiningsih, Agustiningsih; Trimarsanto, Hidayat; Setiawaty, Vivi; Artika, I Made; Muljono, David Handojo
2016-08-30
Influenza is an acute respiratory illness and has become a serious public health problem worldwide. The need to study the HA and NA genes in influenza A virus is essential since these genes frequently undergo mutations. This study describes the development of primer sets for RT-PCR to obtain complete coding sequence of Hemagglutinin (HA) and Neuraminidase (NA) genes of influenza A/H3N2 virus from Indonesia. The primers were developed based on influenza A/H3N2 sequence worldwide from Global Initiative on Sharing All Influenza Data (GISAID) and further tested using Indonesian influenza A/H3N2 archived samples of influenza-like illness (ILI) surveillance from 2008 to 2009. An optimum RT-PCR condition was acquired for all HA and NA fragments designed to cover complete coding sequence of HA and NA genes. A total of 71 samples were successfully sequenced for complete coding sequence both of HA and NA genes out of 145 samples of influenza A/H3N2 tested. The developed primer sets were suitable for obtaining complete coding sequences of HA and NA genes of Indonesian samples from 2008 to 2009.
The Development and Flight Testing of an Aerially Deployed Unmanned Aerial System
NASA Astrophysics Data System (ADS)
Smith, Andrew
An investigation into the feasibility of aerial deployed unmanned aerial vehicles was completed. The investigation included the development and flight testing of multiple unmanned aerial systems to investigate the different components of potential aerial deployment missions. The project consisted of two main objectives; the first objective dealt with the development of an airframe capable of surviving aerial deployment from a rocket and then self assembling from its stowed configuration into its flight configuration. The second objective focused on the development of an autopilot capable of performing basic guidance, navigation, and control following aerial deployment. To accomplish these two objectives multiple airframes were developed to verify their completion experimentally. The first portion of the project, investigating the feasibility of surviving an aerial deployment, was completed using a fixed wing glider that following a successful deployment had 52 seconds of controlled flight. Before developing the autopilot in the second phase of the project, the glider was significantly upgraded to fix faults discovered in the glider flight testing and to enhance the system capabilities. Unfortunately to conform to outdoor flight restrictions imposed by the university and the Federal Aviation Administration it was required to switch airframes before flight testing of the new fixed wing platform could begin. As a result, an autopilot was developed for a quadrotor and verified experimentally completely indoors to remain within the limits of governing policies.
ERIC Educational Resources Information Center
Mayer, Alexander K.; Richburg-Hayes, Lashawn; Diamond, John
2015-01-01
Access to college has increased substantially over the last 50 years, but student success--defined as the combination of academic success and degree or certificate completion--has not kept pace. Student success, moreover, generally correlates with students' financial resources: Students from high-income families attend and complete college at…
NASA Technical Reports Server (NTRS)
Greenough, B. M.; Mahan, R. E.
1974-01-01
A hydrazine/water electrolysis process system module design was fabricated and tested to demonstrate component and module performance. This module is capable of providing both the metabolic oxygen for crew needs and the oxygen and nitrogen for spacecraft leak makeup. The component designs evolved through previous R and D efforts, and were fabricated and tested individually and then were assembled into a complete module which was successfully tested for 1000 hours to demonstrate integration of the individual components. A survey was made of hydrazine sensor technology and a cell math model was derived.
Beamed Energy Propulsion by Means of Target Ablation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosenberg, Benjamin A.
2004-03-30
This paper describes hundreds of pendulum tests examining the beamed energy conversion efficiency of different metal targets coated with multiple liquid enhancers. Preliminary testing used a local laser with photographic paper targets, with no liquid, water, canola oil, or methanol additives. Laboratory experimentation was completed at Wright-Patterson AFB using a high-powered laser, and ballistic pendulums of aluminum, titanium, or copper. Dry targets, and those coated with water, methanol and oil were repeatedly tested in laboratory conditions. Results were recorded on several high-speed digital video cameras, and the conversion efficiency was calculated. Paper airplanes successfully launched using BEP were likewise recorded.
Microbial identification system for Space Station Freedom
NASA Technical Reports Server (NTRS)
Brown, Harlan D.; Scarlett, Janie B.; Skweres, Joyce A.; Fortune, Russell L.; Staples, John L.; Pierson, Duane L.
1989-01-01
The Environmental Health System (EHS) and Health Maintenance Facility (HMF) on Space Station Freedom will require a comprehensive microbiology capability. This requirement entails the development of an automated system to perform microbial identifications on isolates from a variety of environmental and clinical sources and, when required, to perform antimicrobial sensitivity testing. The unit currently undergoing development and testing is the Automated Microbiology System II (AMS II) built by Vitek Systems, Inc. The AMS II has successfully completed 12 months of laboratory testing and evaluation for compatibility with microgravity operation. The AMS II is a promising technology for use on Space Station Freedom.
Development tests of LOX/LH2 tank for H-I launch vehicle
NASA Astrophysics Data System (ADS)
Takamatsu, H.; Imagawa, K.; Ichimaru, Y.
1984-10-01
The design and preliminary test performance of an integrated LOX/LH2 tank for the second-stage propulsion system of the H-I launch be vehicle being developed by NASDA are presented and illustrated with drawings, diagrams, photographs, graphs, and tables. The tank has length 5.7 m, diameter 2.5 m, and capacity 8.7 tons and is constructed of 2219 Al alloy. The common bulkhead of Al-alloy-covered GFRP honeycomb, identified as the most critical component, has successfully completed extensive mechanical and thermal testing of both subscale and prototype models.
High Temperature Electrolysis 4 kW Experiment Design, Operation, and Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
J.E. O'Brien; X. Zhang; K. DeWall
2012-09-01
This report provides results of long-term stack testing completed in the new high-temperature steam electrolysis multi-kW test facility recently developed at INL. The report includes detailed descriptions of the piping layout, steam generation and delivery system, test fixture, heat recuperation system, hot zone, instrumentation, and operating conditions. This facility has provided a demonstration of high-temperature steam electrolysis operation at the 4 kW scale with advanced cell and stack technology. This successful large-scale demonstration of high-temperature steam electrolysis will help to advance the technology toward near-term commercialization.
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. To the left are several pneumatic panels. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
Summary of Rocketdyne Engine A5 Rocket Based Combined Cycle Testing
NASA Technical Reports Server (NTRS)
Ketchum. A.; Emanuel, Mark; Cramer, John
1998-01-01
Rocketdyne Propulsion and Power (RPP) has completed a highly successful experimental test program of an advanced rocket based combined cycle (RBCC) propulsion system. The test program was conducted as part of the Advanced Reusable Technology program directed by NASA-MSFC to demonstrate technologies for low-cost access to space. Testing was conducted in the new GASL Flight Acceleration Simulation Test (FAST) facility at sea level (Mach 0), Mach 3.0 - 4.0, and vacuum flight conditions. Significant achievements obtained during the test program include 1) demonstration of engine operation in air-augmented rocket mode (AAR), ramjet mode and rocket mode and 2) smooth transition from AAR to ramjet mode operation. Testing in the fourth mode (scramjet) is scheduled for November 1998.
Efficient Testing Combining Design of Experiment and Learn-to-Fly Strategies
NASA Technical Reports Server (NTRS)
Murphy, Patrick C.; Brandon, Jay M.
2017-01-01
Rapid modeling and efficient testing methods are important in a number of aerospace applications. In this study efficient testing strategies were evaluated in a wind tunnel test environment and combined to suggest a promising approach for both ground-based and flight-based experiments. Benefits of using Design of Experiment techniques, well established in scientific, military, and manufacturing applications are evaluated in combination with newly developing methods for global nonlinear modeling. The nonlinear modeling methods, referred to as Learn-to-Fly methods, utilize fuzzy logic and multivariate orthogonal function techniques that have been successfully demonstrated in flight test. The blended approach presented has a focus on experiment design and identifies a sequential testing process with clearly defined completion metrics that produce increased testing efficiency.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willoner, T.; Turlington, R.; Koenig, R.
The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, inmore » 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault. Deploying the ARG-US RFID system lends to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including radiation and environmental monitoring. The successful completion of the testing program will provide field data to support future development and testing.« less
Recent Progress on the Stretched Lens Array (SLA)
NASA Technical Reports Server (NTRS)
O'Neill, Markl; McDanal, A. J.; Piszczor, Michael; George, Patrick; Eskenazi, Michael; Botke, Matthew; Edwards, David; Hoppe, David; Brandhorst, Henry
2005-01-01
At the last Space Photovoltaic Research and Technology Conference, SPRAT XVII, held during the fateful week of 9/11/01, our team presented a paper on the early developments related to the new Stretched Lens Array (SLA), including its evolution from the successful SCARLET array on the NASA/JPL Deep Space 1 spacecraft. Within the past two years, the SLA team has made significant progress in the SLA technology, including the successful fabrication and testing of a complete four-panel prototype solar array wing (Fig. 1). The prototype wing verified the mechanical and structural design of the rigid-panel SLA approach, including multiple successful demonstrations of automatic wing deployment. One panel in the prototype wing included four fully functional photovoltaic receivers, employing triple-junction solar cells.
ALMA Test Sharpens Vision of New Observatory
NASA Astrophysics Data System (ADS)
2010-01-01
The Atacama Large Millimeter/submillimeter Array (ALMA) has passed a key milestone crucial to producing the high-quality images that will be the trademark of this revolutionary new tool for astronomy. A team of ALMA astronomers and engineers successfully linked three of the observatory's advanced antennas at the 16,500-foot-elevation observing site in northern Chile. Linking three antennas to work in unison for the first time allowed the ALMA team to correct errors that can arise when only two antennas are used, thus paving the way for precise, high-resolution imaging. The three-antenna linkup was a key test of the full electronic and software system now being installed at ALMA. Its success shows that the completed ALMA system of 66 high-tech antennas will be capable of producing astronomical images of unprecedented quality at its designed observing wavelengths. "This successful test shows that we are well on the way to providing the clear, sharp ALMA images that will open a whole new window for observing the Universe. We look forward to imaging stars and planets as well as galaxies in their formation processes," said Fred Lo, director of the National Radio Astronomy Observatory (NRAO), which leads North America's participation in the ALMA project. A multi-antenna imaging system such as ALMA uses its antennas in pairs, with each antenna working with every other antenna. Each pair contributes a unique piece of information about the region of sky under observation. The contributions of all the pairs are collected and computer-processed into a completed image following the observation. Earlier ALMA tests, at the ALMA Test Facility in New Mexico, at ALMA's lower-elevation Operations Support Facility, and at the high observing site, had successfully linked pairs of antennas. This demonstrated the proper functioning of the antennas and electronic systems as what scientists and engineers call interferometer pairs. However, the information from one pair of antennas may be affected by errors in the system itself or by atmospheric effects. In order to remove such errors and ensure accurate imaging, a third antenna is needed. With the third antenna included, the system is said to have achieved "phase closure." The ALMA phase closure came as part of an ongoing series of tests beginning in late November. ALMA is designed to provide scientists with the ability to study the Universe using the shortest radio wavelengths at which the Earth's atmosphere is transparent. With sensitivity and imaging capability at these wavelengths never before available, ALMA is expected to make major advances in our understanding of such phenomena as star and planet formation, the birth of the first stars and galaxies in the Universe, the end stages of stellar life, and the chemistry of the Universe, among others. "With the successful achievement of phase closure, we now know we have a fully-functioning system, and we'll proceed to add more antennas as they are completed and brought to the observing site," said Al Wootten, North American ALMA Project Scientist. ALMA, an international astronomy facility, is a partnership of North America, Europe, and East Asia, in cooperation with the Republic of Chile.
2011-05-26
concrete plate and compact soil Confirmation: Complete Success both tests The TDD functioned as programmed; traces show entry and exit from each...concrete target and difference in deceleration levels between concrete and soil configuration The final exit & fire signals were generated as planned...Technical Data Package • Determine Process Capability • FMEA Manufacturing • Determine process capability • Cp = ( USL -LSL)/(6*Sigma) • Cpl
Results of preliminary tests of pelletized crested wheatgrass seed.
E.W. Stevenson
1949-01-01
Pelletized seed for use in range reseeding has been given wide publicity and its merits have received much acclaim. Bring the past three years it has been used on several thousand acres of range land. Reports of results have been conflicting, with some claims of striking success and others of complete failure. Tisdale (1) has found poor germination results with...
ERIC Educational Resources Information Center
Abrahams, Fatima; Friedrich, Christian; Tredoux, Nanette
2012-01-01
South African higher education institutions are experiencing challenges regarding access, redress and the successful completion of programmes in an environment where there are still imbalances in the schooling system. Tools are needed that will assist with the process of selecting students. The aim of this study is to determine whether a test…
KGCS and ECS Local HMI Display Control System Engineer
NASA Technical Reports Server (NTRS)
Curtis, Bryan
2017-01-01
My time here at KSC has involved creating and updating HMI displays to support Pad 39B and the Mobile Launcher. I also had the opportunity to be involved with testing PLC hardware for Electromagnetic interferences. This report explains in more detail of the steps involved in successfully completing these responsibilities I have been fortunate enough to be involved with.
Drilling and production aspects of horizontal wells in the Austin Chalk
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheikholeslami, B.A.; Scholhman, B.W.; Seidel, F.A.
1991-07-01
This paper discusses testing of horizontal technology for use in the highly fractured Giddings oil field. Three short-and seven medium-radius wells were drilled successfully in the Austin Chalk formation. The paper discusses well plans, bottomhole assemblies, trajectory control, telemetry, mud systems, hydraulics, hole cleaning, casing design, cementing, problems encountered, formation evaluation, completions, and reservoir response.
The Effects of Student Coaching: An Evaluation of a Randomized Experiment in Student Advising
ERIC Educational Resources Information Center
Bettinger, Eric P.; Baker, Rachel B.
2014-01-01
College graduation rates often lag behind college attendance rates. One theory as to why students do not complete college is that they lack key information about how to be successful or fail to act on the information that they have. We present evidence from a randomized experiment which tests the effectiveness of individualized student coaching.…
Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Will
2006-09-01
The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less
Schwartz, Sarah M; Evans, Cathy; Agur, Anne M R
2015-01-01
Students in health care professional programs face many stressful tests that determine successful completion of their program. Test anxiety during these high stakes examinations can affect working memory and lead to poor outcomes. Methods of decreasing test anxiety include lengthening the time available to complete examinations or evaluating students using untimed examinations. There is currently no consensus in the literature regarding whether untimed examinations provide a benefit to test performance in clinical anatomy. This study aimed to determine the impact of timed versus untimed practical tests on Master of Physical Therapy student anatomy performance and test anxiety. Test anxiety was measured using the State-Trait Anxiety Inventory (STAI). Differences in performance, anxiety scores, and time taken were compared using paired sample Student's t-tests. Eighty-one of the 84 students completed the study and provided feedback. Students performed significantly higher on the untimed test (P = 0.005), with a significant reduction in test anxiety (P < 0.001). Students who were unsuccessful on the timed test showed the greatest improvement on the untimed test ( x¯ = 20.4 ±10%). Eighty-three percent (n = 69) of students preferred the untimed test, 8.4% (n = 7) the timed test, and 8.4% (n = 7) had no preference. Students took on average eight minutes longer on the untimed test. This study found that physical therapy students perform better on untimed tests, which may be related to a reduction in test anxiety. If the intended goal of evaluating health care professional students is to determine fundamental competencies, these factors should be considered when designing future curricula. © 2014 American Association of Anatomists.
Preconception risk assessment of infertile couples
Nekuei, Nafisehsadat; Kazemi, Ashraf; Ehsanpur, Soheila; Beigi, Nastaran Mohammad Ali
2013-01-01
Background: With regard to the importance of preconception conditions in maternal health and fertility, preconception risk assessment makes treatment trends and pregnancy outcome more successful among infertile couples. This study has tried to investigate preconception risk assessment in infertile couples. Materials and Methods: This is a descriptive analytical survey conducted on 268 subjects, selected by convenient sampling, referring to Isfahan infertility centers (Iran). The data were collected by questionnaires through interview and clients’ medical records. Pre-pregnancy risk assessment including history taking (personal, familial, medical, medications, menstruation, and pregnancy), exams (physical, genital, and vital signs), and routine test requests (routine, cervix, infections, and biochemical tests) was performed in the present study. Results: The results showed that the lowest percentage of taking a complete history was for personal history (0.4%) and the highest was for history of menstruation (100%). The lowest percentage of complete exam was for physical exam (3.4%) and the highest for genital exam (100%). With regard to laboratory assessment, the highest percentage was for routine tests (36.6%) and the lowest was for infection tests (0.4%). Conclusion: Based o the results of the present study, most of the risk assessment components are poorly assessed in infertile couples. With regard to the importance of infertility treatment, spending high costs and time on that, and existence of high-risk individuals as well as treatment failures, health providers should essentially pay special attention to preconception risk assessment in infertile couples in order to enhance the chance of success and promote treatment outcome. PMID:23983724
Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010-2015.
Bain, Allison A; Abbott, Anne L; Miller, Laura L
2016-04-14
Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa's, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency's action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact.
Teaching qualitative research to BSW students through exposure to aging.
Sidell, Nancy L
2007-01-01
This article describes one rural program's efforts to expose students to gerontology through teaching qualitative research methodology. A collaborative research pilot project was developed with a local nursing home. BSW students worked in two groups to conduct and present qualitative research projects by the course's completion. This article describes the research project and evaluates the project's success from student and instructor viewpoints. Significant differences were found in self-reported student knowledge of key concepts at the project's completion, compared with pre-test knowledge. Student comments revealed value in this teaching approach. Implications for further engaging students in gerontological research are discussed.
The X-43A Hyper-X Mach 7 Flight 2 Guidance, Navigation, and Control Overview and Flight Test Results
NASA Technical Reports Server (NTRS)
Bahm, Catherine; Baumann, Ethan; Martin, John; Bose, David; Beck, Roger E.; Strovers, Brian
2005-01-01
The objective of the Hyper-X program was to flight demonstrate an airframe-integrated hypersonic vehicle. On March 27, 2004, the Hyper-X program team successfully conducted flight 2 and achieved all of the research objectives. The Hyper-X research vehicle successfully separated from the Hyper-X launch vehicle and achieved the desired engine test conditions before the experiment began. The research vehicle rejected the disturbances caused by the cowl door opening and the fuel turning on and off and maintained the engine test conditions throughout the experiment. After the engine test was complete, the vehicle recovered and descended along a trajectory while performing research maneuvers. The last data acquired showed that the vehicle maintained control to the water. This report will provide an overview of the research vehicle guidance and control systems and the performance of the vehicle during the separation event and engine test. The research maneuvers were performed to collect data for aerodynamics and flight controls research. This report also will provide an overview of the flight controls related research and results.
PMR Graphite Engine Duct Development
NASA Technical Reports Server (NTRS)
Stotler, C. L.; Yokel, S. A.
1989-01-01
The objective was to demonstrate the cost and weight advantages that could be obtained by utilizing the graphite/PMR15 material system to replace titanium in selected turbofan engine applications. The first component to be selected as a basis for evaluation was the outer bypass duct of the General Electric F404 engine. The operating environment of this duct was defined and then an extensive mechanical and physical property test program was conducted using material made by processing techniques which were also established by this program. Based on these properties, design concepts to fabricate a composite version of the duct were established and two complete ducts fabricated. One of these ducts was proof pressure tested and then run successfully on a factory test engine for over 1900 hours. The second duct was static tested to 210 percent design limit load without failure. An improved design was then developed which utilized integral composite end flanges. A complete duct was fabricated and successfully proof pressure tested. The net results of this effort showed that a composite version of the outer duct would be 14 percent lighter and 30 percent less expensive that the titanium duct. The other type of structure chosen for investigation was the F404 fan stator assembly, including the fan stator vanes. It was concluded that it was feasible to utilize composite materials for this type structure but that the requirements imposed by replacing an existing metal design resulted in an inefficient composite design. It was concluded that if composites were to be effectively used in this type structure, the design must be tailored for composite application from the outset.
Wei, Wei; Taormina, Robert J
2014-12-01
This study refined the concept of resilience and developed four valid and reliable subscales to measure resilience, namely, Determination, Endurance, Adaptability and Recuperability. The study also assessed their hypothesized relationships with six antecedent variables (worry, physiological needs satisfaction, organizational socialization, conscientiousness, future orientation and Chinese values) and with one outcome variable (nurses' career success). The four new 10-item subscale measures of personal resilience were constructed based on their operational definitions and tested for their validity and reliability. All items were included in a questionnaire completed by 244 full-time nurses at two hospitals in China. All four measures demonstrated concurrent validity and had high reliabilities (from 0.74 to 0.78). The hypothesized correlations with the personality and organizational variables were statistically significant and in the predicted directions. Regression analyses confirmed these relationships, which explained 25-32% of the variance for the four resilience facets and 27% of the variance for the nurses' career success. The results provided strong evidence that organizational socialization facilitates resilience, that resilience engenders career success and that identifying the four resilience facets permits a more complete understanding of personal resilience, which could benefit nurses, help nurse administrators with their work and also help in treating patients. © 2014 John Wiley & Sons Ltd.
Pool, Sean M; Hoyle, John M; Malone, Laurie A; Cooper, Lloyd; Bickel, C Scott; McGwin, Gerald; Rimmer, James H; Eberhardt, Alan W
2016-04-08
One approach to encourage and facilitate exercise is through interaction with virtual environments. The present study assessed the utility of Microsoft Kinect as an interface for choosing between multiple routes within a virtual environment through body gestures and voice commands. The approach was successfully tested on 12 individuals post-stroke and 15 individuals with cerebral palsy (CP). Participants rated their perception of difficulty in completing each gesture using a 5-point Likert scale questionnaire. The "most viable" gestures were defined as those with average success rates of 90% or higher and perception of difficulty ranging between easy and very easy. For those with CP, hand raises, hand extensions, and head nod gestures were found most viable. For those post-stroke, the most viable gestures were torso twists, head nods, as well as hand raises and hand extensions using the less impaired hand. Voice commands containing two syllables were viable (>85% successful) for those post-stroke; however, participants with CP were unable to complete any voice commands with a high success rate. This study demonstrated that Kinect may be useful for persons with mobility impairments to interface with virtual exercise environments, but the effectiveness of the various gestures depends upon the disability of the user.
ERIC Educational Resources Information Center
Mayer, Alexander K.; Richburg-Hayes, Lashawn; Diamond, John
2015-01-01
MDRC is pleased to provide testimony on college access and completion to the Advisory Committee on Student Financial Assistance. Access to college has increased substantially over the last 50 years, but student success--defined as the combination of academic success and degree or certificate completion--has not kept pace. Student success,…
Rahimy, E; Wilson, J; Tsao, T-C; Schwartz, S; Hubschman, J-P
2013-01-01
Purpose The aim of this study is to develop a novel robotic surgical platform, the IRISS (Intraocular Robotic Interventional and Surgical System), capable of performing both anterior and posterior segment intraocular surgery, and assess its performance in terms of range of motion, speed of motion, accuracy, and overall capacities. Patients and methods To test the feasibility of performing ‘bimanual' intraocular surgical tasks using the IRISS, we defined four steps out of typical anterior (phacoemulsification) and posterior (pars plana vitrectomy (PPV)) segment surgery. Selected phacoemulsification steps included construction of a continuous curvilinear capsulorhexis and cortex removal in infusion–aspiration (I/A) mode. Vitrectomy steps consisted of performing a core PPV, followed by aspiration of the posterior hyaloid with the vitreous cutter to induce a posterior vitreous detachment (PVD) assisted with triamcinolone, and simulation of the microcannulation of a temporal retinal vein. For each evaluation, the duration and the successful completion of the task with or without complications or involuntary events was assessed. Results Intraocular procedures were successfully performed on 16 porcine eyes. Four eyes underwent creation of a round, curvilinear anterior capsulorhexis without radialization. Four eyes had I/A of lens cortical material completed without posterior capsular tear. Four eyes completed 23-gauge PPV followed by successful PVD induction without any complications. Finally, simulation of microcannulation of a temporal retinal vein was successfully achieved in four eyes without any retinal tears/perforations noted. Conclusion Robotic-assisted intraocular surgery with the IRISS may be technically feasible in humans. Further studies are pending to improve this particular surgical platform. PMID:23722720
Low-cost single-crystal turbine blades, volume 2
NASA Technical Reports Server (NTRS)
Strangman, T. E.; Dennis, R. E.; Heath, B. R.
1984-01-01
The overall objectives of Project 3 were to develop the exothermic casting process to produce uncooled single-crystal (SC) HP turbine blades in MAR-M 247 and higher strength derivative alloys and to validate the materials process and components through extensive mechanical property testing, rig testing, and 200 hours of endurance engine testing. These Program objectives were achieved. The exothermic casting process was successfully developed into a low-cost nonproperietary method for producing single-crystal castings. Single-crystal MAR-M 247 and two derivatives DS alloys developed during this project, NASAIR 100 and SC Alloy 3, were fully characterized through mechanical property testing. SC MAR-M 247 shows no significant improvement in strength over directionally solidified (DS) MAR-M 247, but the derivative alloys, NASAIR 100 and Alloy 3, show significant tensile and fatigue improvements. Firtree testing, holography, and strain-gauge rig testing were used to determine the effects of the anisotropic characteristics of single-crystal materials. No undesirable characteristics were found. In general, the single-crystal material behaved similarly to DS MAR-M 247. Two complete engine sets of SC HP turbine blades were cast using the exothermic casting process and fully machined. These blades were successfully engine-tested.
Lee, Ya-Ting; Turcotte, Donald L; Holliday, James R; Sachs, Michael K; Rundle, John B; Chen, Chien-Chih; Tiampo, Kristy F
2011-10-04
The Regional Earthquake Likelihood Models (RELM) test of earthquake forecasts in California was the first competitive evaluation of forecasts of future earthquake occurrence. Participants submitted expected probabilities of occurrence of M ≥ 4.95 earthquakes in 0.1° × 0.1° cells for the period 1 January 1, 2006, to December 31, 2010. Probabilities were submitted for 7,682 cells in California and adjacent regions. During this period, 31 M ≥ 4.95 earthquakes occurred in the test region. These earthquakes occurred in 22 test cells. This seismic activity was dominated by earthquakes associated with the M = 7.2, April 4, 2010, El Mayor-Cucapah earthquake in northern Mexico. This earthquake occurred in the test region, and 16 of the other 30 earthquakes in the test region could be associated with it. Nine complete forecasts were submitted by six participants. In this paper, we present the forecasts in a way that allows the reader to evaluate which forecast is the most "successful" in terms of the locations of future earthquakes. We conclude that the RELM test was a success and suggest ways in which the results can be used to improve future forecasts.
Status of NASA's Space Launch System
NASA Technical Reports Server (NTRS)
Honeycutt, John; Cook, Jerry; Lyles, Garry
2016-01-01
NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.
Status of NASA's Space Launch System
NASA Technical Reports Server (NTRS)
Lyles, Garry
2016-01-01
NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.
Ramponi, Cristina; Barnard, Philip J; Kherif, Ferath; Henson, Richard N
2011-08-01
Although functional neuroimaging studies have supported the distinction between explicit and implicit forms of memory, few have matched explicit and implicit tests closely, and most of these tested perceptual rather than conceptual implicit memory. We compared event-related fMRI responses during an intentional test, in which a group of participants used a cue word to recall its associate from a prior study phase, with those in an incidental test, in which a different group of participants used the same cue to produce the first associate that came to mind. Both semantic relative to phonemic processing at study, and emotional relative to neutral word pairs, increased target completions in the intentional test, but not in the incidental test, suggesting that behavioral performance in the incidental test was not contaminated by voluntary explicit retrieval. We isolated the neural correlates of successful retrieval by contrasting fMRI responses to studied versus unstudied cues for which the equivalent "target" associate was produced. By comparing the difference in this repetition-related contrast across the intentional and incidental tests, we could identify the correlates of voluntary explicit retrieval. This contrast revealed increased bilateral hippocampal responses in the intentional test, but decreased hippocampal responses in the incidental test. A similar pattern in the bilateral amygdale was further modulated by the emotionality of the word pairs, although surprisingly only in the incidental test. Parietal regions, however, showed increased repetition-related responses in both tests. These results suggest that the neural correlates of successful voluntary explicit memory differ in directionality, even if not in location, from the neural correlates of successful involuntary implicit (or explicit) memory, even when the incidental test taps conceptual processes.
Improved recovery demonstration for Williston Basin carbonates. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sippel, M.A.
The purpose of this project was to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in-place, and methods for improved completion efficiency. The investigations and demonstrations were focussed on Red River and Ratcliffe reservoirs in the Williston Basin within portions of Montana, North Dakota and South Dakota. Both of these formations have been successfully explored with conventional 2-dimensional (2D) seismic. Improved reservoir characterization utilizing 3-dimensional (3D) seismic was investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterizations were integrated with geological and engineering studies. The project tested lateral completion techniques, including high-pressure jetting lance technologymore » and short-radius lateral drilling to enhance completion efficiency. Lateral completions should improve economics for both primary and secondary oil where low permeability is a problem and higher-density drilling of vertical infill wells is limited by drilling cost. New vertical wells were drilled to test bypassed oil in ares that were identified by 3D seismic. These new wells are expected to recover as much or greater oil than was produced by nearby old wells. The project tested water injection through vertical and horizontal wells in reservoirs where application of waterflooding has been limited. A horizontal well was drilled for testing water injection. Injection rates were tested at three times that of a vertical well. This demonstration well shows that water injection with horizontal completions can improve injection rates for economic waterflooding. This report is divided into two sections, part 1 covers the Red River and part 2 covers the Ratcliffe. Each part summarizes integrated reservoir characterizations and outlines methods for targeting by-passed oil reserves in the respective formation and locality.« less
Official Portrait of Astronaut Michael Collins
NASA Technical Reports Server (NTRS)
1967-01-01
This is the official NASA portrait of astronaut Michael Collins. Collins chose an Air Force career following graduation from West Point. He served as an experimental flight test officer at the Air Force Flight Test Center, Edwards Air Force Base, California, and, in that capacity, tested performance and stability and control characteristics of Air Force aircraft, primarily jet fighters. Having logged approximately 5,000 hours flying time, Collins was one of the third group of astronauts named by NASA in October 1963. Collins completed two space flights, logging 266 hours in space, of which, 1 hour and 27 minutes was spent in Extra Vehicular Activity (EVA). On July 18, 1966, he served as backup pilot for the Gemini VII mission which included a successful rendezvous and docking with a separately launched Agena target vehicle and, using the power of the Agena, maneuvered the Gemini spacecraft into another orbit for a rendezvous with a second, passive Agena. His skillful performance in completing two periods of EVA included the recovery of a micrometeorite detection experiment from the passive Agena. July 16-24, 1969, Collins served as command module (CM) pilot on Apollo 11, the historic first lunar landing mission. He remained aboard the CM, Columbia, on station in lunar orbit and performed the final re-docking maneuvers following a successful lunar orbit rendezvous with the Lunar Module (LM), Eagle. Collins left NASA in January 1970.
1967-01-09
This is the official NASA portrait of astronaut Michael Collins. Collins chose an Air Force career following graduation from West Point. He served as an experimental flight test officer at the Air Force Flight Test Center, Edwards Air Force Base, California, and, in that capacity, tested performance and stability and control characteristics of Air Force aircraft, primarily jet fighters. Having logged approximately 5,000 hours flying time, Collins was one of the third group of astronauts named by NASA in October 1963. Collins completed two space flights, logging 266 hours in space, of which, 1 hour and 27 minutes was spent in Extra Vehicular Activity (EVA). On July 18, 1966, he served as backup pilot for the Gemini VII mission which included a successful rendezvous and docking with a separately launched Agena target vehicle and, using the power of the Agena, maneuvered the Gemini spacecraft into another orbit for a rendezvous with a second, passive Agena. His skillful performance in completing two periods of EVA included the recovery of a micrometeorite detection experiment from the passive Agena. July 16-24, 1969, Collins served as command module (CM) pilot on Apollo 11, the historic first lunar landing mission. He remained aboard the CM, Columbia, on station in lunar orbit and performed the final re-docking maneuvers following a successful lunar orbit rendezvous with the Lunar Module (LM), Eagle. Collins left NASA in January 1970.
Design and Analysis of the International X-Ray Observatory Mirror Modules
NASA Technical Reports Server (NTRS)
McClelland, Ryan S.; Carnahan, Timothy M.; Robinson, David W.; Saha, Timo T.
2009-01-01
The Soft X-Ray Telescope (SXT) modules are the fundamental focusing assemblies on NASA's next major X-ray telescope mission, the International X-Ray Observatory (IXO). The preliminary design and analysis of these assemblies has been completed, addressing the major engineering challenges and leading to an understanding of the factors effecting module performance. Each of the 60 modules in the Flight Mirror Assembly (FMA) supports 200-300 densely packed 0.4 mm thick glass mirror segments in order to meet the unprecedented effective area required to achieve the scientific objectives of the mission. Detailed Finite Element Analysis (FEA), materials testing, and environmental testing have been completed to ensure the modules can be successfully launched. Resulting stress margins are positive based on detailed FEA, a large factor of safety, and a design strength determined by robust characterization of the glass properties. FEA correlates well with the results of the successful modal, vibration, and acoustic environmental tests. Deformation of the module due to on-orbit thermal conditions is also a major design driver. A preliminary thermal control system has been designed and the sensitivity of module optical performance to various thermal loads has been determined using optomechanical analysis methods developed for this unique assembly. This design and analysis furthers the goal of building a module that demonstrates the ability to meet IXO requirements, which is the current focus of the IXO FMA technology development team.
Uni, Masahiro; Nishimura, Naoki; Yamano, Yasuhiko; Ishikawa, Genta; Kitamura, Atsushi; Tomishima, Yutaka; Jinta, Torahiko; Takahashi, Osamu; Deshpande, Gautam; Chohnabayashi, Naohiko
2015-09-01
Previous reports have documented the efficacy of an early switch from intravenous to oral antimicrobials in community-acquired pneumonia, but not aspiration pneumonia. Therefore, we assessed the feasibility and efficacy of these newly developed criteria for community-acquired pneumonia in patients with aspiration pneumonia. This prospective observational study included consecutive patients admitted with aspiration pneumonia over a 10-month period at St. Luke's International Hospital; we excluded patients that required intensive care. The criteria for an early switch were stability of vital signs (temperature ≤ 38 °C; respiratory rate ≤ 24 breaths/min; pulse rate ≤ 100 beats/min for >24 h) and a successful swallow evaluation (repetitive saliva swallowing test score ≥ 2; modified water swallowing test score ≥ 4). Our primary endpoint was successful completion of antimicrobial treatment 30 days after the switch, without reversion to intravenous antimicrobials. Our anticipated success rate was set as 60-75%, based on a previous study. Of the 70 patients admitted with aspiration pneumonia, 32 (45.7%) were excluded, and 38 (54.3%) met the inclusion criteria. Of these 38 patients, 29 (76.3%) met the switch criteria. The median duration of hospital stay for the included patients was 16 (5-30) days and 30 (12-68) days, respectively (P=0.03). Among patients who met the switch criteria, 26 (89.7%) completed oral treatment successfully while 3 (10.3%) reverted to intravenous antimicrobials. Approximately 75% of patients met the switch criteria; of these, nearly 90% underwent safe conversion to oral therapy. These results demonstrate the efficacy and feasibility of our switch criteria. Copyright © 2015. Published by Elsevier B.V.
Topical Treatment of Dermatophytic Lesion on Mice (Mus musculus) Model.
Sharma, Bindu; Kumar, Padma; Joshi, Suresh Chandra
2011-06-01
Antidermatophytic potential of three weed plants viz. Tridax procumbens L., Capparis decidua (forsk) Edgew and Lantana camara L. were explored and experimentally induced dermatophytic lesion was topically treated in mice. Microbroth dilution method was carried out for determination of MIC and MFC of different extracts of selected plants. In animal studies, mice were experimentally inoculated with Trichophyton mentagrophytes and infected animals were topically treated with 5 mg/g terbinafine and two concentrations, i.e., 5 and 10 mg/g of test extract ointment. Complete recovery from the infection was observed on 12th day of treatment for reference drug terbinafine (5 mg/g) and 10 mg/g concentration of test extract ointment whereas 5 mg/g concentration of test extract ointment showed complete cure on 16th day of treatment. Fungal burden was also calculated by culturing skin scrapings from infected animals of different groups. Test extract ointment successfully treated induced dermatophytosis in mice without any disease recurrence incidences, thereby indicating efficacy of test extract as an excellent topical antifungal agent for the cure of dermatophytosis.
The Application of Voltage Transformer Simulator in Electrical Test Training
NASA Astrophysics Data System (ADS)
Li, Nan; Zhang, Jun; Chai, Ziqi; Wang, Jingpeng; Yang, Baowei
2018-02-01
The voltage transformer test is an important means to monitor its operating state. The accuracy and reliability of the test data is directly related to the test skill level of the operator. However, the risk of test instruments damage, equipment being tested damage and electric shock in operator is caused by improper operation when training the transformer test. In this paper, a simulation device of voltage transformer is set up, and a simulation model is built for the most common 500kV capacitor voltage transformer (CVT), the simulation model can realize several test items of CVT by combing with teaching guidance platform, simulation instrument, complete set of system software and auxiliary equipment in Changchun. Many successful applications show that the simulation device has good practical value and wide application prospect.
Pendulum detector testing device
Gonsalves, J.M.
1997-09-30
A detector testing device is described which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: (1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, (2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and (3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements. 5 figs.
Pendulum detector testing device
Gonsalves, John M.
1997-01-01
A detector testing device which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: 1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, 2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and 3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements.
NASA Technical Reports Server (NTRS)
Kizhner, Semion; Day, John H. (Technical Monitor)
2000-01-01
Post-processing of data, related to a GPS receiver test in a GPS simulator and test facility, is an important step towards qualifying a receiver for space flight. Although the GPS simulator provides all the parameters needed to analyze a simulation, as well as excellent analysis tools on the simulator workstation, post-processing is not a GPS simulator or receiver function alone, and it must be planned as a separate pre-flight test program requirement. A GPS simulator is a critical resource, and it is desirable to move off the pertinent test data from the simulator as soon as a test is completed. The receiver and simulator databases are used to extract the test data files for postprocessing. These files are then usually moved from the simulator and receiver systems to a personal computer (PC) platform, where post-processing is done typically using PC-based commercial software languages and tools. Because of commercial software systems generality their functions are notoriously slow and more than often are the bottleneck even for short duration simulator-based tests. There is a need to do post-processing faster and within an hour after test completion, including all required operations on the simulator and receiver to prepare and move off the post-processing files. This is especially significant in order to use the previous test feedback for the next simulation setup or to run near back-to-back simulation scenarios. Solving the post-processing timing problem is critical for a pre-flight test program success. Towards this goal an approach was developed that allows to speed-up post-processing by an order of a magnitude. It is based on improving the post-processing bottleneck function algorithm using a priory information that is specific to a GPS simulation application and using only the necessary volume of truth data. The presented postprocessing scheme was used in support of a few successful space flight missions carrying GPS receivers.
Advanced Monobore Concept, Development of CFEX Self-Expanding Tubular Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeff Spray
2007-09-30
The Advanced Monobore Concept--CFEX{copyright} Self-Expanding Tubular Technology Development was a successfully executed fundamental research through field demonstration project. This final report is presented as a progression, according to basic technology development steps. For this project, the research and development steps used were: concept development, engineering analysis, manufacturing, testing, demonstration, and technology transfer. The CFEX{copyright} Technology Development--Advanced Monobore Concept Project successfully completed all of the steps for technology development, covering fundamental research, conceptual development, engineering design, advanced-level prototype construction, mechanical testing, and downhole demonstration. Within an approximately two year period, a partially defined, broad concept was evolved into a substantial newmore » technological area for drilling and production engineering applicable a variety of extractive industries--which was also successfully demonstrated in a test well. The demonstration achievement included an actual mono-diameter placement of two self-expanding tubulars. The fundamental result is that an economical and technically proficient means of casing any size of drilling or production well or borehole is indicated as feasible based on the results of the project. Highlighted major accomplishments during the project's Concept, Engineering, Manufacturing, Demonstration, and Technology Transfer phases, are given.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laubach, S.E.; Marrett, R.; Rossen, W.
The research for this project provides new technology to understand and successfully characterize, predict, and simulate reservoir-scale fractures. Such fractures have worldwide importance because of their influence on successful extraction of resources. The scope of this project includes creation and testing of new methods to measure, interpret, and simulate reservoir fractures that overcome the challenge of inadequate sampling. The key to these methods is the use of microstructures as guides to the attributes of the large fractures that control reservoir behavior. One accomplishment of the project research is a demonstration that these microstructures can be reliably and inexpensively sampled. Specificmore » goals of this project were to: create and test new methods of measuring attributes of reservoir-scale fractures, particularly as fluid conduits, and test the methods on samples from reservoirs; extrapolate structural attributes to the reservoir scale through rigorous mathematical techniques and help build accurate and useful 3-D models of the interwell region; and design new ways to incorporate geological and geophysical information into reservoir simulation and verify the accuracy by comparison with production data. New analytical methods developed in the project are leading to a more realistic characterization of fractured reservoir rocks. Testing diagnostic and predictive approaches was an integral part of the research, and several tests were successfully completed.« less
Orbital transfer vehicle oxygen turbopump technology. Volume 2: Nitrogen and ambient oxygen testing
NASA Technical Reports Server (NTRS)
Brannam, R. J.; Buckmann, P. S.; Chen, B. H.; Church, S. J.; Sabiers, R. L.
1990-01-01
The testing of a rocket engine oxygen turbopump using high pressure ambient temperature nitrogen and oxygen as the turbine drive gas in separate test series is discussed. The pumped fluid was liquid nitrogen or liquid oxygen. The turbopump (TPA) is designed to operate with 400 F oxygen turbine drive gas which will be demonstrated in a subsequent test series. Following bearing tests, the TPA was finish machined (impeller blading and inlet/outlet ports). Testing started on 15 February 1989 and was successfully concluded on 21 March 1989. Testing started using nitrogen to reduce the ignition hazard during initial TPA checkout. The Hydrostatic Bearing System requires a Bearing Pressurization System. Initial testing used a separate bearing supply to prevent a rubbing start. Two test series were successfully completed with the bearing assist supplied only by the pump second stage output which entailed a rubbing start until pump pressure builds up. The final test series used ambient oxygen drive and no external bearing assist. Total operating time was 2268 seconds. There were 14 starts without bearing assist and operating speeds up to 80,000 rpm were logged. Teardown examination showed some smearing of silverplated bearing surfaces but no exposure of the underlying monel material. There was no evidence of melting or oxidation due to the oxygen exposure. The articulating, self-centering hydrostatic bearing exhibited no bearing load or stability problems. The only anomaly was higher than predicted flow losses which were attributed to a faulty ring seal. The TPA will be refurbished prior to the 400 F oxygen test series but its condition is acceptable, as is, for continued operating. This was a highly successful test program.
Pipe crawler development for duct elbow removal
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zollinger, W.T.; Treanor, R.C.
1992-01-01
This paper describes the development of equipment for removing an elbow in a 36 inch diameter ventilation line by cutting from the inside. Radiation levels, high air flow and physical constraints preclude any manual rework of the ventilation system. A remotely operated pipe crawler was developed. Testing has been performed in a full-scale mockup which models the ventilation duct configuration with the exception of radiation levels. The results gathered from the testing are discussed, and illustrate the strengths and weaknesses of the crawler and plasma arc torch system. To date, the equipment has successfully completed the tasks of maneuvering throughmore » the duct geometry, performing the two required cuts, and backing out of the duct mockup. The elbow successfully fell away from the main duct, showing that the line would be clear of obstructions.« less
Pipe crawler development for duct elbow removal
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zollinger, W.T.; Treanor, R.C.
1992-11-01
This paper describes the development of equipment for removing an elbow in a 36 inch diameter ventilation line by cutting from the inside. Radiation levels, high air flow and physical constraints preclude any manual rework of the ventilation system. A remotely operated pipe crawler was developed. Testing has been performed in a full-scale mockup which models the ventilation duct configuration with the exception of radiation levels. The results gathered from the testing are discussed, and illustrate the strengths and weaknesses of the crawler and plasma arc torch system. To date, the equipment has successfully completed the tasks of maneuvering throughmore » the duct geometry, performing the two required cuts, and backing out of the duct mockup. The elbow successfully fell away from the main duct, showing that the line would be clear of obstructions.« less
Design and Testing of a Percutaneously Implantable Fetal Pacemaker
Loeb, Gerald E.; Zhou, Li; Zheng, Kaihui; Nicholson, Adriana; Peck, Raymond A.; Krishnan, Anjana; Silka, Michael; Pruetz, Jay; Chmait, Ramen; Bar-Cohen, Yaniv
2012-01-01
We are developing a cardiac pacemaker with a small, cylindrical shape that permits percutaneous implantation into a fetus to treat complete heart block and consequent hydrops fetalis, which can otherwise be fatal. The device uses off-the-shelf components including a rechargeable lithium cell and a highly efficient relaxation oscillator encapsulated in epoxy and glass. A corkscrew electrode made from activated iridium can be screwed into the myocardium, followed by release of the pacemaker and a short, flexible lead entirely within the chest of the fetus to avoid dislodgement from fetal movement. Acute tests in adult rabbits demonstrated the range of electrical parameters required for successful pacing and the feasibility of successfully implanting the device percutaneously under ultrasonic imaging guidance. The lithium cell can be recharged inductively as needed, as indicated by a small decline in the pulsing rate. PMID:22855119
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Fieldbus technology has completed beta plant testing at Monsanto Co.`s Chocolate Bayou petrochemical complex at Alvin, Texas. The trial took place in a steam condensate recovery section of the Chocolate Bayou plant, which produces acrylonitrile, linear alkylbenzene, and a number of other petrochemical derivatives. Fieldbus is a plant communications network, or bus, that enables digital instruments to communicate with one another and with supervisory control systems. The fieldbus specification, written by the nonprofit organization Fieldbus Foundation, Austin, Texas, is called Foundation fieldbus. The beta tests at Chocolate Bayou successfully demonstrated fieldbus performance in a process control application.
Payload spin assembly for the commercial Titan launch vehicle
NASA Technical Reports Server (NTRS)
Robinson, Wilf; Pech, Greg
1991-01-01
A contract was completed to design, build, and test a Payload Spin Assembly (PSA) for installation onto the Martin Marietta Titan 3 Commercial launch vehicle. This assembly provides launch support for satellite payloads up to 5783 kilograms (6.37 tons) and controls release, spin-up, and final separation of the satellite from the second stage. Once separated, the satellite's Perigee Kick Motor (PKM) boosts the satellite into its transfer orbit. The first successful flight occurred December 31, 1989. Requirements, design, test, and problems associated with this mechanical assembly are discussed.
1983-01-01
formulated to achieve weight savings, successfully completed a 100 hour pump test with no loss of fluid viscosity. Initial synthetic approaches to...acquisition cost savings in one concept and 51 percent weight savings in another. (9) (U) Advanced 3D Materials: Demonstrated the feasibility of using...in the gas phase. This research will provide the basis for future laser weapons that are more efficient, powerful, and lighter weight than infrared
Successful application of preimplantation genetic diagnosis for Leigh syndrome.
Unsal, Evrim; Aktaş, Yasemin; Uner, Ozge; BaltacI, Aysun; Ozcan, Sarp; Turhan, Feriba; Baltaci, Volkan
2008-11-01
To perform preimplantation genetic diagnosis (PGD) for a SURF1 gene mutation of the Leigh syndrome to transfer unaffected or carrier embryo/embryos. Case report. Clinical IVF laboratory. A couple carrying an nt769 G/A mutation that is associated with Leigh syndrome. Oocytes were fertilized by means of intracytoplasmic sperm injection. The resulting embryos were biopsied 3 days after fertilization. One blastomere was taken and whole-genome amplification was performed. Amplification of the mutation site was achieved by polymerase chain reaction (PCR) and restriction digestion was completed. Gel Imager was used to measure the digests of normal and mutant load. Embryo testing by means of PGD-PCR and pregnancy. Successful preimplantation genetic diagnosis for a SURF1 gene mutation and transfer of healthy or carrier embryos. Successful singleton pregnancy resulting in the delivery of healthy baby girl. We report the first case of successful PGD for Leigh syndrome resulting in delivery of a healthy newborn.
NASA Astrophysics Data System (ADS)
Nugent, Nicholas Jeremy
Liquid rocket engines extensively use spark-initiated torch igniters for ignition. As the focus shifts to longer missions that require multiple starts of the main engines, there exists a need to solve the significant problems associated with using spark-initiated devices. Improving the fundamental understanding of predicting the required breakdown voltage in rocket environments along with reducing electrical noise is necessary to ensure that missions can be completed successfully. To better understand spark ignition systems and add to the fundamental research on spark development in rocket applications, several parameter categories of interest were hypothesized to affect breakdown voltage: (i) fluid, (ii) electrode, and (iii) electrical. The fluid properties varied were pressure, temperature, density and mass flow rate. Electrode materials, insert electrode angle and spark gap distance were the electrode properties varied. Polarity was the electrical property investigated. Testing how breakdown voltage is affected by each parameter was conducted using three different isolated insert electrodes fabricated from copper and nickel. A spark plug commonly used in torch igniters was the other electrode. A continuous output power source connected to a large impedance source and capacitance provided the pulsing potential. Temperature, pressure and high voltage measurements were recorded for the 418 tests that were successfully completed. Nitrogen, being inert and similar to oxygen, a propellant widely used in torch igniters, was used as the fluid for the majority of testing. There were 68 tests completed with oxygen and 45 with helium. A regression of the nitrogen data produced a correction coefficient to Paschen's Law that predicts the breakdown voltage to within 3000 volts, better than 20%, compared to an over prediction on the order of 100,000 volts using Paschen's Law. The correction coefficient is based on the parameters most influencing breakdown voltage: fluid density, spark gap distance, electrode angles, electrode materials and polarity. The research added to the fundamental knowledge of spark development in rocket ignition applications by determining the parameters that most influence breakdown voltage. Some improvements to the research should include better temperature measurements near the spark gap, additional testing with oxygen and testing with fuels of interest such as hydrogen and methane.
ERIC Educational Resources Information Center
Qualter, Pamela; Gardner, Kathryn J.; Pope, Debbie J.; Hutchinson, Jane M.; Whiteley, Helen E.
2012-01-01
This study examines the long-term effects of ability- and trait EI on academic performance for British adolescents. The sample comprised 413 students from three secondary schools in the North-West of England. Students completed tests of ability EI, trait EI, personality, and cognitive ability in Year 7 (mean age = 11 years 2 months). Performance…
ERIC Educational Resources Information Center
Patterson, Margaret Becker; Song, Wei; Zhang, Jizhi
2009-01-01
For most high school non-completers, the GED[R] (General Educational Development) credential is the bridge to postsecondary education, but little is known about how successfully they could make that transition and whether their participation shifts across time. The American Council on Education (ACE) has begun a three-year longitudinal study to…
An Accurate VO[subscript 2]max Nonexercise Regression Model for 18-65-Year-Old Adults
ERIC Educational Resources Information Center
Bradshaw, Danielle I.; George, James D.; Hyde, Annette; LaMonte, Michael J.; Vehrs, Pat R.; Hager, Ronald L.; Yanowitz, Frank G.
2005-01-01
The purpose of this study was to develop a regression equation to predict maximal oxygen uptake (VO[subscript 2]max) based on nonexercise (N-EX) data. All participants (N = 100), ages 18-65 years, successfully completed a maximal graded exercise test (GXT) to assess VO[subscript 2]max (M = 39.96 mL[middle dot]kg[superscript -1][middle…
ERIC Educational Resources Information Center
Cadet, Myriam Jean
2016-01-01
This study investigated the relationship between readiness to learn and self-efficacy among newly enrolled BSN students in an online program. A sample of 27 students completed the 45-item Test of Online Learning Success (ToOLS) and 10-item General Self Efficacy (GSE) scales via Survey Monkey. Knowles' (1980) adult learning theory and Bandura's…
ERIC Educational Resources Information Center
Patterson, Margaret Becker; Song, Wei; Zhang, Jizhi
2009-01-01
For most high school non-completers, the GED[R] credential is the bridge to postsecondary education, but little is known about how successfully they could make that transition and whether their participation shifts across time. The American Council on Education (ACE) has begun a three-year longitudinal study to understand the effect of the GED…
ITER Central Solenoid Module Fabrication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, John
The fabrication of the modules for the ITER Central Solenoid (CS) has started in a dedicated production facility located in Poway, California, USA. The necessary tools have been designed, built, installed, and tested in the facility to enable the start of production. The current schedule has first module fabrication completed in 2017, followed by testing and subsequent shipment to ITER. The Central Solenoid is a key component of the ITER tokamak providing the inductive voltage to initiate and sustain the plasma current and to position and shape the plasma. The design of the CS has been a collaborative effort betweenmore » the US ITER Project Office (US ITER), the international ITER Organization (IO) and General Atomics (GA). GA’s responsibility includes: completing the fabrication design, developing and qualifying the fabrication processes and tools, and then completing the fabrication of the seven 110 tonne CS modules. The modules will be shipped separately to the ITER site, and then stacked and aligned in the Assembly Hall prior to insertion in the core of the ITER tokamak. A dedicated facility in Poway, California, USA has been established by GA to complete the fabrication of the seven modules. Infrastructure improvements included thick reinforced concrete floors, a diesel generator for backup power, along with, cranes for moving the tooling within the facility. The fabrication process for a single module requires approximately 22 months followed by five months of testing, which includes preliminary electrical testing followed by high current (48.5 kA) tests at 4.7K. The production of the seven modules is completed in a parallel fashion through ten process stations. The process stations have been designed and built with most stations having completed testing and qualification for carrying out the required fabrication processes. The final qualification step for each process station is achieved by the successful production of a prototype coil. Fabrication of the first ITER module is in progress. The seven modules will be individually shipped to Cadarache, France upon their completion. This paper describes the processes and status of the fabrication of the CS Modules for ITER.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Findlay, Rick
The Gnome-Coach, New Mexico, Site was the location of a 3-kiloton-yield underground nuclear test in 1961 and a groundwater tracer test in 1963. The U.S. Geological Survey conducted the groundwater tracer test using four dissolved radionuclides--tritium, iodine-131, strontium-90, and cesium-137--as tracers. Site reclamation and remediation began after the underground testing, and was conducted in several phases at the site. The New Mexico Environment Department (NMED) issued a Conditional Certificate of Completion in September 2014, which documents that surface remediation activities have been successfully completed in accordance with the Voluntary Remediation Program. Subsurface activities have included annual sampling and monitoring ofmore » wells at and near the site since 1972. These annual monitoring activities were enhanced in 2008 to include monitoring hydraulic head and collecting samples from the onsite wells USGS-4, USGS-8, and LRL-7 using the low-flow sampling method. In 2010, the annual monitoring was focused to the monitoring wells within the site boundary. A site inspection and annual sampling were conducted on January 27-28, 2015. A second site visit was conducted on April 21, 2015, to install warning/notification signs to fulfill a requirement of the Conditional Certificate of Completion that was issued by the NMED for the surface.« less
NASA Technical Reports Server (NTRS)
Wintucky, E. G.
1975-01-01
A 5-cm diameter mercury ion thruster main cathode has completed over 20,000 hours of operation in an ongoing lifetime endurance test. The cathode operating parameters remained at acceptable performance levels throughout the test, the first 9175 hours of which were part of a thruster endurance test. After 20,000 hours, the cathode discharge was easily restarted, the tip orifice indicated negligible erosion and the tip heater showed no degradation. The cathode-isolator- vaporizer assembly, a major thruster subsystem, has thus successfully demonstrated an operational lifetime capability of 20,000 hours, which is the lifetime goal of the 8-cm diameter auxiliary propulsion ion thruster.
Two-Dimensional Bifurcated Inlet/Engine Tests Completed in 10- by 10-Foot Supersonic Wind Tunnel
NASA Technical Reports Server (NTRS)
Saunders, John D.
1999-01-01
A Two-Dimensional Bifurcated (2DB) Inlet was successfully tested in NASA Lewis Research Center s 10- by 10-Foot Supersonic Wind Tunnel. These tests were the culmination of a collaborative effort between the Boeing Company, General Electric, Pratt & Whitney, and Lewis. Extensive support in-house at Lewis contributed significantly to the progress and accomplishment of this test. The results, which met or exceeded many of the High-Speed Research (HSR) Program goals, were used to revise system studies within the HSR Program. The HSR Program is focused on developing low-noise, low-polluting, high-efficiency supersonic commercial aircraft. A supersonic inlet is an important component of an efficient, low-noise vehicle.
Application of a Systems Engineering Approach to Support Space Reactor Development
NASA Astrophysics Data System (ADS)
Wold, Scott
2005-02-01
In 1992, approximately 25 Russian and 12 U.S. engineers and technicians were involved in the transport, assembly, inspection, and testing of over 90 tons of Russian equipment associated with the Thermionic System Evaluation Test (TSET) Facility. The entire Russian Baikal Test Stand, consisting of a 5.79 m tall vacuum chamber and related support equipment, was reassembled and tested at the TSET facility in less than four months. In November 1992, the first non-nuclear operational test of a complete thermionic power reactor system in the U.S. was accomplished three months ahead of schedule and under budget. A major factor in this accomplishment was the application of a disciplined top-down systems engineering approach and application of a spiral development model to achieve the desired objectives of the TOPAZ International Program (TIP). Systems Engineering is a structured discipline that helps programs and projects conceive, develop, integrate, test and deliver products and services that meet customer requirements within cost and schedule. This paper discusses the impact of Systems Engineering and a spiral development model on the success of the TOPAZ International Program and how the application of a similar approach could help ensure the success of future space reactor development projects.
ERIC Educational Resources Information Center
Seagle, Donna Love
2017-01-01
This quantitative causal-comparative study examined to what extent, if any, there were significant differences in community college student success rates (course grades, semester GPA, and rates of persistence) between those students completing an online college success course and those completing a traditional college success course. Each of the…
Student Success Reports: College of Alameda, Laney College, Merritt College, and Vista College.
ERIC Educational Resources Information Center
Peralta Community Coll. System, Oakland, CA.
This document analyzes the extent to which the four community colleges in the Peralta district (California) have been successful in terms of student outcomes. Student success is defined as the percentage of successful course completions as compared to unsuccessful course completions. This document looks at the period from the fall of 1993 through…
Wilson, Rozanne; Rochon, Elizabeth; Mihailidis, Alex; Leonard, Carol
2012-04-01
To examine how formal (i.e., employed) caregivers' use verbal and nonverbal communication strategies while assisting individuals with moderate to severe Alzheimer's disease (AD) during the successful completion of an activity of daily living (ADL). Based on the literature, the authors hypothesized that caregivers' use of 1 proposition, closed-ended questions, and repetition would be of most benefit. Twelve caregiver-AD dyads participated in this observational study. Each dyad was videorecorded on 6 separate occasions while completing handwashing. Handwashing sessions were transcribed and systematically coded for the use of communication strategies during completion of the ADL. Caregiver-AD dyads successfully completed 90% of all handwashing sessions, and caregivers employed a variety of communication strategies. Consistent with our hypotheses, during successful task completion, caregivers most frequently provided individuals with AD with 1 direction or idea (i.e., proposition) at a time, closed-ended questions, and paraphrased repetition. Caregivers also frequently used encouraging comments and the resident's name during the task; however, use of these strategies was not correlated to task success rate. This study adds to the limited body of evidence supporting the use of specific communication strategies by caregivers assisting individuals with moderate to severe AD during successful completion of ADLs.
Adé, Apolline; Chauchat, Laure; Frève, Johann-François Ouellette; Gagné, Sébastien; Caron, Nicolas; Bussières, Jean-François
2017-01-01
Background Several studies have compared cleaning procedures for decontaminating surfaces exposed to antineoplastic drugs. All of the cleaning products tested were successful in reducing most of the antineoplastic drug quantities spilled on surfaces, but none of them completely removed residual traces. Objective To assess the efficacy of various cleaning solutions for decontaminating a biological safety cabinet workbench exposed to a defined amount of cyclophosphamide. Methods In this pilot study, specific areas of 2 biological safety cabinets (class II, type B2) were deliberately contaminated with a defined quantity of cyclophosphamide (10 μg or 107 pg). Three cleaning solutions were tested: quaternary ammonium, sodium hypochlorite 0.02%, and sodium hypochlorite 2%. After cleaning, the cyclophosphamide remaining on the areas was quantified by wipe sampling. Each cleaning solution was tested 3 times, with cleaning and wipe sampling being performed 5 times for each test. Results A total of 57 wipe samples were collected and analyzed. The average recovery efficiency was 121.690% (standard deviation 5.058%). The decontamination efficacy increased with the number of successive cleaning sessions: from 98.710% after session 1 to 99.997% after session 5 for quaternary ammonium; from 97.027% to 99.997% for sodium hypochlorite 0.02%; and from 98.008% to 100% for sodium hypochlorite 2%. Five additional cleaning sessions performed after the main study (with detergent and sodium hypochlorite 2%) were effective to complete the decontamination, leaving no detectable traces of the drug. Conclusions All of the cleaning solutions reduced contamination of biological safety cabinet workbenches exposed to a defined amount of cyclophosphamide. Quaternary ammonium and sodium hypochlorite (0.02% and 2%) had mean efficacy greater than 97% for removal of the initial quantity of the drug (107 pg) after the first cleaning session. When sodium hypochlorite 2% was used, fewer cleaning sessions were required to complete decontamination. Further studies should be conducted to identify optimal cleaning strategies to fully eliminate traces of hazardous drugs. PMID:29298999
Fat Imaging via Magnetic Resonance Imaging (MRI) in Young Children (Ages 1-4 Years) without Sedation
Shearrer, Grace E.; House, Benjamin T.; Gallas, Michelle C.; Luci, Jeffrey J.; Davis, Jaimie N.
2016-01-01
Introduction This pilot study developed techniques to perform Magnetic Resonance Imaging (MRI) of specific fat deposition in 18 children (age 18 months to 4 years). Methods The children engaged in a series of practice tests to become acclimated to the scanner noises, reduce claustrophobia, and rehearse holding still for a set time. The practice tests assessed if the child could remain still for two minutes while watching a video, first while lying on a blanket, second, on the blanket with headphones, and third, in the mock scanner. The children who passed the three practice tests were then scanned with a 3T Siemens Skyra magnet. Abdominal fat distribution (region of interest (ROI) from the top of the ileac crest to the bottom of the ribcage) volume was measured using 2-point DIXON technique. This region was chosen to give an indication of the body composition around the liver. Results Twelve out of eighteen participants successfully completed the actual MRI scan. Chi-squared test showed no significant difference between male and female pass-fail rates. The median age of completed scans was 36 months, whereas the median age for children unable to complete a scan was 28 months. The average total trunk fat was 240.9±85.2mL and the average total VAT was 37.7±25.9mLand liver fat was not quantifiable due to physiological motion. Several strategies (modeling, videos, and incentives) were identified to improve pediatric imaging in different age ranges. Conclusion Using an age-specific and tailored protocol, we were able to successfully use MRI for fat imaging in a majority of young children. Development of such protocols enables researchers to better understand the etiology of fat deposition in young children, which can be used to aid in the prevention and treatment of adiposity. PMID:26901881
Shearrer, Grace E; House, Benjamin T; Gallas, Michelle C; Luci, Jeffrey J; Davis, Jaimie N
2016-01-01
This pilot study developed techniques to perform Magnetic Resonance Imaging (MRI) of specific fat deposition in 18 children (age 18 months to 4 years). The children engaged in a series of practice tests to become acclimated to the scanner noises, reduce claustrophobia, and rehearse holding still for a set time. The practice tests assessed if the child could remain still for two minutes while watching a video, first while lying on a blanket, second, on the blanket with headphones, and third, in the mock scanner. The children who passed the three practice tests were then scanned with a 3T Siemens Skyra magnet. Abdominal fat distribution (region of interest (ROI) from the top of the ileac crest to the bottom of the ribcage) volume was measured using 2-point DIXON technique. This region was chosen to give an indication of the body composition around the liver. Twelve out of eighteen participants successfully completed the actual MRI scan. Chi-squared test showed no significant difference between male and female pass-fail rates. The median age of completed scans was 36 months, whereas the median age for children unable to complete a scan was 28 months. The average total trunk fat was 240.9±85.2mL and the average total VAT was 37.7±25.9mLand liver fat was not quantifiable due to physiological motion. Several strategies (modeling, videos, and incentives) were identified to improve pediatric imaging in different age ranges. Using an age-specific and tailored protocol, we were able to successfully use MRI for fat imaging in a majority of young children. Development of such protocols enables researchers to better understand the etiology of fat deposition in young children, which can be used to aid in the prevention and treatment of adiposity.
Photogrammetry Measurements During a Tanking Test on the Space Shuttle External Tank, ET-137
NASA Technical Reports Server (NTRS)
Littell, Justin D.; Schmidt, Tim; Tyson, John; Oliver, Stanley T.; Melis, Matthew E.; Ruggeri, Charles
2012-01-01
On November 5, 2010, a significant foam liberation threat was observed as the Space Shuttle STS-133 launch effort was scrubbed because of a hydrogen leak at the ground umbilical carrier plate. Further investigation revealed the presence of multiple cracks at the tops of stringers in the intertank region of the Space Shuttle External Tank. As part of an instrumented tanking test conducted on December 17, 2010, a three dimensional digital image correlation photogrammetry system was used to measure radial deflections and overall deformations of a section of the intertank region. This paper will describe the experimental challenges that were overcome in order to implement the photogrammetry measurements for the tanking test in support of STS-133. The technique consisted of configuring and installing two pairs of custom stereo camera bars containing calibrated cameras on the 215-ft level of the fixed service structure of Launch Pad 39-A. The cameras were remotely operated from the Launch Control Center 3.5 miles away during the 8 hour duration test, which began before sunrise and lasted through sunset. The complete deformation time history was successfully computed from the acquired images and would prove to play a crucial role in the computer modeling validation efforts supporting the successful completion of the root cause analysis of the cracked stringer problem by the Space Shuttle Program. The resulting data generated included full field fringe plots, data extraction time history analysis, section line spatial analyses and differential stringer peak ]valley motion. Some of the sample results are included with discussion. The resulting data showed that new stringer crack formation did not occur for the panel examined, and that large amounts of displacement in the external tank occurred because of the loads derived from its filling. The measurements acquired were also used to validate computer modeling efforts completed by NASA Marshall Space Flight Center (MSFC).
NASA Technical Reports Server (NTRS)
Morey, W. W.
1984-01-01
This report covers the development and testing of a prototype combustor viewing system. The system allows one to see and record images from the inside of an operating gas turbine combustor. The program proceeded through planned phases of conceptual design, preliminary testing to resolve problem areas, prototype design and fabrication, and rig testing. Successful tests were completed with the viewing system in the laboratory, in a high pressure combustor rig, and on a Pratt and Whitney PW20307 jet engine. Both film and video recordings were made during the tests. Digital image analysis techniques were used to enhance images and bring out special effects. The use of pulsed laser illumination was also demonstrated as a means for observing liner surfaces in the presence of luminous flame.
Separator development and testing of nickel-hydrogen cells
NASA Technical Reports Server (NTRS)
Gonzalez-Sanabria, O. D.; Manzo, M. A.
1984-01-01
The components, design, and operating characteristics of Ni-H2 cells batteries were improved. A separator development program was designed to develop a separator that is resistant to penetration by oxygen and loose active material from then nickel electrode, while retraining the required chemical and thermal stability, reservoir capability, and high ionic conductivity. The performance of the separators in terms of cell operating voltage was to at least match that of state-of-the-art separators while eliminating the separator problems. The separators were submitted to initial screening tests and those which successfully completed the tests were built into Ni-H2 cells for short term testing. The separators with the best performance are tested for long term performance and life.
An Overview of the Nuclear Electric Xenon Ion System (NEXIS) Activity
NASA Technical Reports Server (NTRS)
Randolph, Thomas M.; Polk, James E., Jr.
2004-01-01
The Nuclear Electric Xenon Ion System (NEXIS) research and development activity within NASA's Project Prometheus, was one of three proposals selected by NASA to develop thruster technologies for long life, high power, high specific impulse nuclear electric propulsion systems that would enable more robust and ambitious science exploration missions to the outer solar system. NEXIS technology represents a dramatic improvement in the state-of-the-art for ion propulsion and is designed to achieve propellant throughput capabilities >= 2000 kg and efficiencies >= 78% while increasing the thruster power to >= 20 kW and specific impulse to >= 6000 s. The NEXIS technology uses erosion resistant carbon-carbon grids, a graphite keeper, a new reservoir hollow cathode, a 65-cm diameter chamber masked to produce a 57-cm diameter ion beam, and a shared neutralizer architecture to achieve these goals. The accomplishments of the NEXIS activity so far include performance testing of a laboratory model thruster, successful completion of a proof of concept reservoir cathode 2000 hour wear test, structural and thermal analysis of a completed development model thruster design, fabrication of most of the development model piece parts, and the nearly complete vacuum facility modifications to allow long duration wear testing of high power ion thrusters.
Innovative grinding wheel design for cost-effective machining of advanced ceramics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Licht, R.H.; Kuo, P.; Liu, S.
2000-05-01
This Final Report covers the Phase II Innovative Grinding Wheel (IGW) program in which Norton Company successfully developed a novel grinding wheel for cost-effective cylindrical grinding of advanced ceramics. In 1995, Norton Company successfully completed the 16-month Phase I technical effort to define requirements, design, develop, and evaluate a next-generation grinding wheel for cost-effective cylindrical grinding of advanced ceramics using small prototype wheels. The Phase II program was initiated to scale-up the new superabrasive wheel specification to larger diameters, 305-mm to 406-mm, required for most production grinding of cylindrical ceramic parts, and to perform in-house and independent validation grinding tests.
Novel fiber optic immunosensor instrument
NASA Astrophysics Data System (ADS)
Wang, Zhiyu; Huang, Wenling; Tang, Lei; Zhou, Bo; Li, Yugi; He, Jun
1996-09-01
It has developed and performed a novel fiberoptic immunosensor instrument with operating wavelength 400 - 760 nm and repeatability cv equals 0.27%. The instrument has many excellent features such as simplified operation, faster testing time, higher sensitivity and economic cost. It has completely eliminated recovery period which traditional immunosensor owned due to use separative sensor structure. It can widely apply to test for bacteria, virus, hormone, parasite and cancer protein in clinical examination. The instrument has operated in laboratory and relevant medicine units and successfully tested monoclonal rat-anti-human of 413 cases in clinic and prepared with existing ELISA method, the coincidence probability reached 94 to 100%.
An Analysis of the Speed Commands from an Interval Management Algorithm during the ATD-1 Flight Test
NASA Technical Reports Server (NTRS)
Watters, Christine; Wilson, Sara R.; Swieringa, Kurt A.
2017-01-01
NASA's first Air Traffic Management Technology Demonstration (ATD-1) successfully completed a nineteen-day flight test under a NASA contract with Boeing, with Honeywell and United Airlines as sub-contractors. An Interval Management (IM) avionics prototype was built based on international IM standards, integrated into two test aircraft, and then flown in real-world conditions to determine if the goals of improving aircraft efficiency and airport throughput during high-density arrival operations could be met. This paper describes the speed behavior of the IM avionics prototype, focusing on the speed command rate and the number of speed increases.
Drnach, Mark; O'Brien, Patricia A; Kreger, Alison
2010-09-01
The purpose of this study was to determine the outcome of a short-term therapeutic horseback riding intervention on the gross motor function in a child with cerebral palsy. This study employed a repeated-measures design with a pretest, a post-test, and a post post-test conducted 5 weeks apart using the Gross Motor Function Measure (GMFM) as an outcome measure. The three sets of test scores from the GMFM were compared upon completion of the intervention. The subject participated in a 5-week therapeutic horseback riding program consisting of 1 hour of riding per week. Each riding session consisted of stretching, strengthening, and balance activities. The child's level of motor function was tested prior to the intervention, upon completion of the intervention, and 5 weeks postintervention. The GMFM, a criterion-referenced observational measure designed to measure change in the gross motor function in children with cerebral palsy, was chosen as the assessment tool. Upon completion of the 5-week intervention, the child was observed to have improved scores on the GMFM in two of the five dimensions measured and scored for a total of eight items. The post post-test was completed 5 weeks after the final riding session and the results demonstrated successful maintenance of the improved scores in seven of eight items. The result of this case study suggest that 5 weeks of therapeutic riding are sufficient to produce positive changes in the gross motor function of a child with cerebral palsy.
The X-43A (Hyper-X) Flies Into the Record Books
NASA Technical Reports Server (NTRS)
Grindle, Laurie; Bahm, Catherine
2006-01-01
The goal of the Hyper-X research program, conducted jointly by the NASA Dryden Flight Research Center and the NASA Langley Research Center, was to demonstrate and validate the technology, experimental techniques, and computation methods and tools for design and performance predictions of a hypersonic aircraft with an airframe-integrated, scramjet propulsion system. Three X-43A airframe-integrated, scramjet research vehicles were designed and fabricated to achieve that goal by flight test: two test flights at Mach 7 and one test flight at Mach 10. The first flight, conducted on June 2, 2001, experienced a launch vehicle failure and resulted in a 9-month mishap investigation. A two-year return-to-flight effort ensued and concluded when the second Mach 7 flight was successful on March 27, 2004. Just eight months later, on November 16, the X-43A successfully completed the third and final flight. These two flights were the first flight demonstrations, at Mach 7 and Mach 10 respectively, of an airframe-integrated, scramjet-powered, hypersonic vehicle.
Reinventing Image Detective: An Evidence-Based Approach to Citizen Science Online
NASA Astrophysics Data System (ADS)
Romano, C.; Graff, P. V.; Runco, S.
2017-12-01
Usability studies demonstrate that web users are notoriously impatient, spending as little as 15 seconds on a home page. How do you get users to stay long enough to understand a citizen science project? How do you get users to complete complex citizen science tasks online?Image Detective, a citizen science project originally developed by scientists and science engagement specialists at the NASA Johnson Space center to engage the public in the analysis of images taken from space by astronauts to help enhance NASA's online database of astronaut imagery, partnered with the CosmoQuest citizen science platform to modernize, offering new and improved options for participation in Image Detective. The challenge: to create a web interface that builds users' skills and knowledge, creating engagement while learning complex concepts essential to the accurate completion of tasks. The project team turned to usability testing for an objective understanding of how users perceived Image Detective and the steps required to complete required tasks. A group of six users was recruited online for unmoderated and initial testing. The users followed a think-aloud protocol while attempting tasks, and were recorded on video and audio. The usability test examined users' perception of four broad areas: the purpose of and context for Image Detective; the steps required to successfully complete the analysis (differentiating images of Earth's surface from those showing outer space and identifying common surface features); locating the image center point on a map of Earth; and finally, naming geographic locations or natural events seen in the image.Usability test findings demonstrated that the following best practices can increase participation in Image Detective and can be applied to the successful implementation of any citizen science project:• Concise explanation of the project, its context, and its purpose;• Including a mention of the funding agency (in this case, NASA);• A preview of the specific tasks required of participants;• A dedicated user interface for the actual citizen science interaction.In addition, testing revealed that users may require additional context when a task is complex, difficult, or unusual (locating a specific image and its center point on a map of Earth). Video evidence will be made available with this presentation.
Reinventing Image Detective: An Evidence-Based Approach to Citizen Science Online
NASA Technical Reports Server (NTRS)
Romano, Cia; Graff, Paige V.; Runco, Susan
2017-01-01
Usability studies demonstrate that web users are notoriously impatient, spending as little as 15 seconds on a home page. How do you get users to stay long enough to understand a citizen science project? How do you get users to complete complex citizen science tasks online? Image Detective, a citizen science project originally developed by scientists and science engagement specialists at the NASA Johnson Space center to engage the public in the analysis of images taken from space by astronauts to help enhance NASA's online database of astronaut imagery, partnered with the CosmoQuest citizen science platform to modernize, offering new and improved options for participation in Image Detective. The challenge: to create a web interface that builds users' skills and knowledge, creating engagement while learning complex concepts essential to the accurate completion of tasks. The project team turned to usability testing for an objective understanding of how users perceived Image Detective and the steps required to complete required tasks. A group of six users was recruited online for unmoderated and initial testing. The users followed a think-aloud protocol while attempting tasks, and were recorded on video and audio. The usability test examined users' perception of four broad areas: the purpose of and context for Image Detective; the steps required to successfully complete the analysis (differentiating images of Earth's surface from those showing outer space and identifying common surface features); locating the image center point on a map of Earth; and finally, naming geographic locations or natural events seen in the image. Usability test findings demonstrated that the following best practices can increase participation in Image Detective and can be applied to the successful implementation of any citizen science project: (1) Concise explanation of the project, its context, and its purpose; (2) Including a mention of the funding agency (in this case, NASA); (3) A preview of the specific tasks required of participants; (4) A dedicated user interface for the actual citizen science interaction. In addition, testing revealed that users may require additional context when a task is complex, difficult, or unusual (locating a specific image and its center point on a map of Earth). Video evidence will be made available with this presentation.
Flight Testing of the Capillary Pumped Loop 3 Experiment
NASA Technical Reports Server (NTRS)
Ottenstein, Laura; Butler, Dan; Ku, Jentung; Cheung, Kwok; Baldauff, Robert; Hoang, Triem
2002-01-01
The Capillary Pumped Loop 3 (CAPL 3) experiment was a multiple evaporator capillary pumped loop experiment that flew in the Space Shuttle payload bay in December 2001 (STS-108). The main objective of CAPL 3 was to demonstrate in micro-gravity a multiple evaporator capillary pumped loop system, capable of reliable start-up, reliable continuous operation, and heat load sharing, with hardware for a deployable radiator. Tests performed on orbit included start-ups, power cycles, low power tests (100 W total), high power tests (up to 1447 W total), heat load sharing, variable/fixed conductance transition tests, and saturation temperature change tests. The majority of the tests were completed successfully, although the experiment did exhibit an unexpected sensitivity to shuttle maneuvers. This paper describes the experiment, the tests performed during the mission, and the test results.
Kay, Joseph S; Shane, Jacob; Heckhausen, Jutta
2016-12-01
Associations between youths' reported relationships with their parents, beliefs about how success is attained, educational aspirations, and university completion were examined. Data come from the German Socioeconomic Panel. At age 17, youth (n = 3284) reported on their relationships with their parents, beliefs about success, and educational aspirations. University completion was assessed up to eight years later. At age 17, perceptions of parental warmth and interest in youths' academics were associated with beliefs that success is due to merit (positively) and that success is due to external factors or dominance over others (negatively). Beliefs that success is due to merit and external factors were associated with educational aspirations positively and negatively respectively. Educational aspirations positively predicted university completion up to eight years later. Relationships with parents had stronger associations with achievement when parents completed a university degree; beliefs about success had stronger associations with aspirations when parents did not. Copyright © 2016 The Foundation for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.
Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission
NASA Technical Reports Server (NTRS)
Ziemer, John K.; Randolph, Thomas M.; Franklin, Garth W.; Hruby, Vlad; Spence, Douglas; Demmons, Nathaniel; Roy, Thomas; Ehrbar, Eric; Zwahlen, Jurg; Martin, Roy;
2008-01-01
Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.
Ignorance of electrosurgery among obstetricians and gynaecologists.
Mayooran, Zorana; Pearce, Scott; Tsaltas, Jim; Rombauts, Luk; Brown, T Ian H; Lawrence, Anthony S; Fraser, Kym; Healy, David L
2004-12-01
The purpose of this study was to assess the level of skill of laparoscopic surgeons in electrosurgery. Subjects were asked to complete a practical diathermy station and a written test of electrosurgical knowledge. Tests were held in teaching and non-teaching hospitals. Twenty specialists in obstetrics and gynaecology were randomly selected and tested on the Monash University gynaecological laparoscopic pelvi-trainer. Twelve candidates were consultants with 9-28 years of practice in operative laparoscopy, and 8 were registrars with up to six years of practice in operative laparoscopy. Seven consultants and one registrar were from rural Australia, and three consultants were from New Zealand. Candidates were marked with checklist criteria resulting in a pass/fail score, as well as a weighted scoring system. We retested 11 candidates one year later with the same stations. No improvement in electrosurgery skill in one year of obstetric and gynaecological practice. No candidate successfully completed the written electrosurgery station in the initial test. A slight improvement in the pass rate to 18% was observed in the second test. The pass rate of the diathermy station dropped from 50% to 36% in the second test. The study found ignorance of electrosurgery/diathermy among gynaecological surgeons. One year later, skills were no better.
NASA Astrophysics Data System (ADS)
Shepherd, O.; Aurilio, G.; Bucknam, R. D.; Hurd, A. G.; Robertie, N. F.
1991-06-01
This is Volume 3 of a three volume final report on the design, development and test of balloonborne and groundbased lidar systems. Volume 1 describes the design and fabrication of a balloonborne CO2 coherent payload to measure the 10.6 micrometers backscatter from atmospheric aerosols as a function of altitude. Volume 2 describes the August 1987 flight test of Atmospheric Balloonborne Lidar Experiment, ABLE 2. In this volume we describe groundbased lidar development and measurements. A design was developed for installation of the ABLE lidar in the GL rooftop dome. A transportable shed was designed to house the ABLE lidar at the various remote measurement sites. Refurbishment and modification of the ABLE lidar were completed to permit groundbased lidar measurements of clouds and aerosols. Lidar field measurements were made at Ascension Island during SABLE 89. Lidar field measurements were made at Terciera, Azores during GABLE 90. These tasks have been successfully completed, and recommendations for further lidar measurements and data analysis have been made.
NASA Technical Reports Server (NTRS)
Fleming, J. R.
1979-01-01
Testing of low cost low suspension power slurry vehicles is presented. Cutting oils are unlikely to work, but a mineral oil with additives should be workable. Two different abrasives were tested. A cheaper silicon carbide from Norton gave excellent results except for excessive kerf loss: the particles were too big. An abrasive treated for lubricity showed no lubricity improvement in mineral oil vehicle. The bounce fixture was tested for the first time under constant cut rate conditions (rather than constant force). Although the cut was not completed before the blades broke, the blade lifetime of thin (100 micrometer) blades was 120 times the lifetime without the fixture. The large prototype saw completed a successful run, producing 90% cutting yield (849 wafers) at 20 wafers/cm. Although inexperience with large numbers of wafers caused cleaning breakage to reduce this yield to 74%, the yield was high enough that the concept of the large saw is proven workable.
Reedsport PB150 Deployment and Ocean Test Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, Phil
2016-06-03
As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport (OR) was planned to consist of 10 PowerBuoys (Phase II)1, located 2.5 miles off the coast. U.S. Department of Energy (DOE) funding under a prior DOE Grant (DE-FG36-08GO88017) along with funding from PNGC Power, an Oregon-based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. The design and fabrication of the first PowerBuoy and factory testing of the power take-off subsystem were completed, and the power take-off subsystem wasmore » successfully integrated into the spar at the fabricator’s facility in Oregon. The objectives of this follow-on grant were: advance PB150B design from TRL 5/6 to TRL 7/8; deploy a single PB150 and operate autonomously for 2 years; establish O&M costs; collect environmental information; and establish manufacturing methodologies.« less
A recent Cleanroom success story: The Redwing project
NASA Technical Reports Server (NTRS)
Hausler, Philip A.
1992-01-01
Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.
Large rotorcraft transmission technology development program
NASA Technical Reports Server (NTRS)
Mack, J. C.
1983-01-01
Testing of a U.S. Army XCH-62 HLH aft rotor transmission under NASA Contract NAS 3-22143 was successfully completed. This test establishes the feasibility of large, high power rotorcraft transmissions as well as demonstrating the resolution of deficiencies identified during the HLH advanced technology programs and reported by USAAMRDLTR-77-38. Over 100 hours of testing was conducted. At the 100% design power rating of 10,620 horsepower, the power transferred through a single spiral bevel gear mesh is more than twice that of current helicopter bevel gearing. In the original design of these gears, industry-wide design methods were employed and failures were experienced which identified problem areas unique to gear size. To remedy this technology shortfall, a program was developed to predict gear stresses using finite element analysis for complete and accurate representation of the gear tooth and supporting structure. To validate the finite element methodology gear strain data from the existing U.S. Army HLH aft transmission was acquired, and existing data from smaller gears were made available.
Space Shuttle SRM development. [Solid Rocket Motors
NASA Technical Reports Server (NTRS)
Brinton, B. C.; Kilminster, J. C.
1979-01-01
The successful static test of the fourth Development Space Shuttle Solid Rocket Motor (SRM) in February 1979 concluded the development testing phase of the SRM Project. Qualification and flight motors are currently being fabricated, with the first qualification motor to be static tested. Delivered thrust-time traces on all development motors were very close to predicted values, and both specific and total impulse exceeded specification requirements. 'All-up' static tests conducted with a solid rocket booster equipment on development motors achieved all test objectives. Transportation and support equipment concepts have been proven, baselining is complete, and component reusability has been demonstrated. Evolution of the SRM transportation support equipment, and special test equipment designs are reviewed, and development activities discussed. Handling and processing aspects of large, heavy components are described.
Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010–2015
Abbott, Anne L.; Miller, Laura L.
2016-01-01
Background Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa’s, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Community Context Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency’s action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. Methods A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. Outcome The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Interpretation Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact. PMID:27079648
Knapik, Joseph J; Hauret, Keith G; Lange, Jeffery L; Jovag, Brian
2003-06-01
Recruits are assigned to the Army Physical Fitness Test Enhancement Program (APFTEP) if they are unable to pass the final Army physical fitness test at the end of basic combat training (BCT). The U.S. Army Medical Command tasked the U.S. Army Center for Health Promotion and Preventive Medicine to examine the retention in service of individuals completing this program. To accomplish this tasking, the following data were obtained: a list of APFTEP recruits at Fort Jackson, South Carolina between January 1999 and June 2001; a list of BCT graduates from the Army Training Requirements and Resources System; and a comparison group of non-APFTEP recruits matched 3 to 1 on the basis of age, gender, Army entry date (+/- 30 days), BCT location, and active Army status from the Army Medical Surveillance Activity. We found that the proportion of recruits who successfully completed the APFTEP and graduated from BCT (85% of men, 80% of women) was lower than documented graduation rates for all recruits (93% of men, 87% of women). Retention in service after 1 year was also lower for APFTEP recruits than for non-APFTEP recruits among both men (74% vs. 92%, p < 0.01) and women (63% vs. 84%, p < 0.01). Despite the lower BCT graduation success and retention in service for APFTEP recruits, the program does assist in retaining soldiers who would otherwise be discharged for failing the Army physical fitness test. Thus, the program may be a useful tool for limiting attrition.
Fluid cognitive ability is a resource for successful emotion regulation in older and younger adults
Opitz, Philipp C.; Lee, Ihno A.; Gross, James J.; Urry, Heather L.
2014-01-01
The Selection, Optimization, and Compensation with Emotion Regulation (SOC-ER) framework suggests that (1) emotion regulation (ER) strategies require resources and that (2) higher levels of relevant resources may increase ER success. In the current experiment, we tested the specific hypothesis that individual differences in one internal class of resources, namely cognitive ability, would contribute to greater success using cognitive reappraisal (CR), a form of ER in which one reinterprets the meaning of emotion-eliciting situations. To test this hypothesis, 60 participants (30 younger and 30 older adults) completed standardized neuropsychological tests that assess fluid and crystallized cognitive ability, as well as a CR task in which participants reinterpreted the meaning of sad pictures in order to alter (increase or decrease) their emotions. In a control condition, they viewed the pictures without trying to change how they felt. Throughout the task, we indexed subjective emotional experience (self-reported ratings of emotional intensity), expressive behavior (corrugator muscle activity), and autonomic physiology (heart rate and electrodermal activity) as measures of emotional responding. Multilevel models were constructed to explain within-subjects variation in emotional responding as a function of ER contrasts comparing increase or decrease conditions with the view control condition and between-subjects variation as a function of cognitive ability and/or age group (older, younger). As predicted, higher fluid cognitive ability—indexed by perceptual reasoning, processing speed, and working memory—was associated with greater success using reappraisal to alter emotional responding. Reappraisal success did not vary as a function of crystallized cognitive ability or age group. Collectively, our results provide support for a key tenet of the SOC-ER framework that higher levels of relevant resources may confer greater success at emotion regulation. PMID:24987387
Fluid cognitive ability is a resource for successful emotion regulation in older and younger adults.
Opitz, Philipp C; Lee, Ihno A; Gross, James J; Urry, Heather L
2014-01-01
The Selection, Optimization, and Compensation with Emotion Regulation (SOC-ER) framework suggests that (1) emotion regulation (ER) strategies require resources and that (2) higher levels of relevant resources may increase ER success. In the current experiment, we tested the specific hypothesis that individual differences in one internal class of resources, namely cognitive ability, would contribute to greater success using cognitive reappraisal (CR), a form of ER in which one reinterprets the meaning of emotion-eliciting situations. To test this hypothesis, 60 participants (30 younger and 30 older adults) completed standardized neuropsychological tests that assess fluid and crystallized cognitive ability, as well as a CR task in which participants reinterpreted the meaning of sad pictures in order to alter (increase or decrease) their emotions. In a control condition, they viewed the pictures without trying to change how they felt. Throughout the task, we indexed subjective emotional experience (self-reported ratings of emotional intensity), expressive behavior (corrugator muscle activity), and autonomic physiology (heart rate and electrodermal activity) as measures of emotional responding. Multilevel models were constructed to explain within-subjects variation in emotional responding as a function of ER contrasts comparing increase or decrease conditions with the view control condition and between-subjects variation as a function of cognitive ability and/or age group (older, younger). As predicted, higher fluid cognitive ability-indexed by perceptual reasoning, processing speed, and working memory-was associated with greater success using reappraisal to alter emotional responding. Reappraisal success did not vary as a function of crystallized cognitive ability or age group. Collectively, our results provide support for a key tenet of the SOC-ER framework that higher levels of relevant resources may confer greater success at emotion regulation.
HIV risk behavior before and after HIV counseling and testing in jail: a pilot study.
Beckwith, Curt G; Liu, Tao; Bazerman, Lauri B; DeLong, Allison K; Desjardins, Simon F; Poshkus, Michael M; Flanigan, Timothy P
2010-04-01
Jail incarceration represents an opportunity to deliver HIV counseling and testing (C&T) services to persons at increased risk of infection. However, jails can be chaotic with rapid turnover of detainees. We conducted a pilot study to investigate the feasibility of comparing the effect of different approaches to HIV C&T in jail on subsequent HIV risk behaviors among persons testing HIV negative. Consecutive cohorts of newly incarcerated jail detainees were recruited with 132 subjects completing standard HIV C&T as per jail protocol and 132 subjects completing rapid testing with an individualized counseling session. Risk behavior was assessed and compared at baseline and 6 weeks after jail release. Among the 264 male participants, preincarceration substance use and sexual risk were common. The follow-up visit was completed by 59% of eligible participants. There were no differences in postrelease HIV risk behavior between the 2 arms but there was an overall decrease in risk behavior after jail release for the cohort. In addition, all participants in the rapid arm received rapid HIV test results compared with participants receiving 28% of conventional test results. Jail incarceration represents an important public health opportunity to deliver HIV C&T. This study demonstrated (1) feasibility in delivering rapid HIV testing combined with individualized counseling to jail detainees, (2) improved test result delivery rates, and (3) success with evaluating risk behaviors during the transition from jail to the community. Further research is needed to determine the optimal approach to HIV C&T in jail with the goal of increasing awareness of HIV serostatus and decreasing HIV risk behavior.
Jiang, Nan; Zhao, Gui-Qiu; Lin, Jing; Hu, Li-Ting; Che, Cheng-Ye; Wang, Qian; Xu, Qiang; Li, Cui; Zhang, Jie
2018-01-01
To conduct a systematic review and quantitative Meta-analysis of the efficacy and safety of combined surgery for the eyes with coexisting cataract and open angle glaucoma. We performed a systematic search of the related literature in the Cochrane Library, PubMed, EMBASE, Web of Science databases, CNKI, CBM and Wan Fang databases, with no limitations on language or publication date. The primary efficacy estimate was identified by weighted mean difference of the percentage of intraocular pressure reduction (IOPR%) from baseline to end-point, the percentage of number of glaucoma medications reduction from pre- to post-operation, and the secondary efficacy evaluations were performed by odds ratio (OR) and 95% confidence interval (CI) for complete and qualified success rate. Besides, ORs were applied to assess the tolerability of adverse incidents. Meta-analyses of fixed or random effect models were performed using RevMan software 5.2 to gather the consequences. Heterogeneity was evaluated by Chi 2 test and the I 2 measure. Ten studies enrolling 3108 patients were included. The combined consequences indicated that both glaucoma and combined cataract and glaucoma surgery significantly decreased IOP. For deep sclerectomy vs deep sclerectomy plus phacoemulsification and canaloplasty vs phaco-canaloplasty, the differences in IOPR% were not all statistically significant while trabeculotomy was detected to gain a quantitatively greater IOPR% compared with trabeculotomy plus phacoemulsification. Furthermore, there was no statistical significance in the complete and qualified success rate, and the rates of adverse incidents for trabeculotomy vs trabeculotomy plus phacoemulsification. Compared with trabeculotomy plus phacoemulsification, trabeculectomy alone is more effective in lowering IOP and the number of glaucoma medications, while the two surgeries can not demonstrate statistical differences in the complete success rate, qualified success rate, or incidence of adverse incidents.
Progress and achievements of R&D activities for the ITER vacuum vessel
NASA Astrophysics Data System (ADS)
Nakahira, M.; Takahashi, H.; Koizumi, K.; Onozuka, M.; Ioki, K.
2001-04-01
The Full Scale Sector Model Project, which was initiated in 1995 as one of the Seven Large Projects for ITER R&D, has been continued with the joint effort of the ITER Joint Central Team and the Japanese, Russian Federation and United States Home Teams. The fabrication of a full scale 18° toroidal sector, which is composed of two 9° sectors spliced at the port centre, was successfully completed in September 1997 with a dimensional accuracy of +/-3 mm for the total height and total width. Both sectors were shipped to the test site at the Japan Atomic Energy Research Institute and the integration test of the sectors was begun in October 1997. The integration test involves the adjustment of field joints, automatic narrow gap tungsten inert gas welding of field joints with splice plates and inspection of the joints by ultrasonic testing, as required for the initial assembly of the ITER vacuum vessel. This first demonstration of field joint welding and the performance test of the mechanical characteristics were completed in May 1998, and all the results obtained have satisfied the ITER design. In addition to these tests, integration with the midplane port extension fabricated by the Russian Home Team by using a fully remotized welding and cutting system developed by the US Home Team was completed in March 2000. The article describes the progress, achievements and latest status of the R&D activities for the ITER vacuum vessel.
NASA Technical Reports Server (NTRS)
Sauerwein, Timothy A.; Gostomski, Thomas
2008-01-01
The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.
Removing Barriers to High School Completion--Technical Report. System Improvement and Reporting.
ERIC Educational Resources Information Center
Alberta Learning, Edmonton.
The ability of every student to successfully complete high school is fundamental to continued success and quality of life. As such, Alberta Learning's 2000-2003 Business Plan has set a target for improving high school completion by 19-year-old students from 70% to 75%. A key step to achieving this target has involved completing a study of barriers…
Coal Technology Program progress report for April 1976
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In the Hydrocarbonization Research program, two successful experiments were completed in the bench-scale hydrocarbonizer. A settling test at a lower temperature (390/sup 0/F) using 20 percent toluene in Solvent Refined Coal (SRC) Unfiltered Oil (UFO) produced a 30 percent clarified product in 2 hr. Characterization tests include distillation curves for Wilsonville's SRC-UFO and a particle size distribution of Pittsburg and Midway Coal Mining Company's (PAMCO) SRC-UFO. Studies of intermediate-temperature pyrolysis of large blocks have been maintained with char samples continuing to demonstrate pyrophoricity, even after heating to 700/sup 0/C. Simulated distillation analysis of tars produced by the last eight experimentsmore » are being compared with those performed at Laramie upon tars produced by the Hanna No. 2 experiment. In Coal-Fueled MIUS, stainless steel tubing to be used in one of the furnace tube bundles was ordered and the bid package for the furnace completed. Tests continued on the coal feed system and with the cold flow fluidized bed model. For the Synthoil process, flow diagrams, material balances, and utilities requirements were completed for the entire facility. For the Hydrocarbonization process, flowsheets were reviewed for compatibility; equipment lists were brought up to date; and utilities requirements were compiled from the individual flowsheets. The char recovery and storage subsystem flowsheet was completed. (auth)« less
Anti-Idling Battery for Truck Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keith Kelly
2011-09-30
In accordance to the Assistance Agreement DE-EE0001036, the objective of this project was to develop an advanced high voltage lithium-ion battery for use in an all-electric HVAC system for Class-7-8 heavy duty trucks. This system will help heavy duty truck drivers meet the tough new anti-idling laws being implemented by over 23 states. Quallion will be partnering with a major OEM supplier of HVAC systems to develop this system. The major OEM supplier will provide Quallion the necessary interface requirements and HVAC hardware to ensure successful testing of the all-electric system. At the end of the program, Quallion will delivermore » test data on three (3) batteries as well as test data for the prototype HVAC system. The objectives of the program are: (1) Battery Development - Objective 1 - Define battery and electronics specifications in preparation for building the prototype module. (Completed - summary included in report) and Objective 2 - Establish a functional prototype battery and characterize three batteries in-house. (Completed - photos and data included in report); (2) HVAC Development - Objective 1 - Collaborate with manufacturers to define HVAC components, layout, and electronics in preparation for establishing the prototype system. (Completed - photos and data included in report) and Objective 2 - Acquire components for three functional prototypes for use by Quallion. (Completed - photos and data included in report).« less
NASA Astrophysics Data System (ADS)
Shepherd, O.; Bucknam, R. D.; Hurd, A. G.; Sheehan, W. H.
1991-06-01
This is Volume 3 of a three volume final report on the design, development, and test of balloonborne and groundbased lidar systems. Volume 1 describes the design and fabrication of a balloonborne CO2 coherent payload to measure the 10.6 micrometers backscatter from atmospheric aerosols as a function of altitude. Volume 2 describes the Aug. 1987 flight test of Atmospheric Balloonborne Lidar Experiment, ABLE 2. In this volume we describe groundbased lidar development and measurements. A design was developed for installation of the ABLE lidar in the GL rooftop dome. A transportable shed was designed to house the ABLE lidar at the various remote measurement sites. Refurbishment and modification of the ABLE lidar were completed to permit groundbased lidar measurements of clouds and aerosols. Lidar field measurements were made at Ascension Island during SABLE 89. Lidar field measurements were made at Terciera, Azores during GABLE 90. These tasks were successfully completed, and recommendations for further lidar measurements and data analysis were made.
Test results from large wing and fuselage panels
NASA Technical Reports Server (NTRS)
Madan, Ram C.; Voldman, Mike
1993-01-01
This paper presents the first results in an assessment of the strength, stiffness, and damage tolerance of stiffened wing and fuselage subcomponents. Under this NASA funded program, 10 large wing and fuselage panels, variously fabricated by automated tow placement and dry-stitched preform/resin transfer molding, are to be tested. The first test of an automated tow placement six-longeron fuselage panel under shear load was completed successfully. Using NASTRAN finite-element analysis the stiffness of the panel in the linear range prior to buckling was predicted within 3.5 percent. A nonlinear analysis predicted the buckling load within 10 percent and final failure load within 6 percent. The first test of a resin transfer molding six-stringer wing panel under compression was also completed. The panel failed unexpectedly in buckling because of inadequate supporting structure. The average strain was 0.43 percent with a line load of 20.3 kips per inch of width. This strain still exceeds the design allowable strains. Also, the stringers did not debond before failure, which is in contrast to the general behavior of unstitched panels.
ATP Depletion Blocks Herpes Simplex Virus DNA Packaging and Capsid Maturation
Dasgupta, Anindya; Wilson, Duncan W.
1999-01-01
During herpes simplex virus (HSV) assembly, immature procapsids must expel their internal scaffold proteins, transform their outer shell to form mature polyhedrons, and become packaged with the viral double-stranded (ds) DNA genome. A large number of virally encoded proteins are required for successful completion of these events, but their molecular roles are poorly understood. By analogy with the dsDNA bacteriophage we reasoned that HSV DNA packaging might be an ATP-requiring process and tested this hypothesis by adding an ATP depletion cocktail to cells accumulating unpackaged procapsids due to the presence of a temperature-sensitive lesion in the HSV maturational protease UL26. Following return to permissive temperature, HSV capsids were found to be unable to package DNA, suggesting that this process is indeed ATP dependent. Surprisingly, however, the display of epitopes indicative of capsid maturation was also inhibited. We conclude that either formation of these epitopes directly requires ATP or capsid maturation is normally arrested by a proofreading mechanism until DNA packaging has been successfully completed. PMID:9971781
Deep Space 1 Using its Ion Engine (Artist's Concept)
NASA Technical Reports Server (NTRS)
2003-01-01
NASA's New Millennium Deep Space 1 spacecraft approaching the comet 19P/Borrelly. With its primary mission to serve as a technology demonstrator--testing ion propulsion and 11 other advanced technologies--successfully completed in September 1999, Deep Space 1 is now headed for a risky, exciting rendezvous with Comet Borrelly. NASA extended the mission, taking advantage of the ion propulsion and other systems to target the daring encounter with the comet in September 2001. Once a sci-fi dream, the ion propulsion engine has powered the spacecraft for over 12,000 hours. Another onboard experiment includes software that tracks celestial bodies so the spacecraft can make its own navigation decisions without the intervention of ground controllers. The first flight in NASA's New Millennium Program, Deep Space 1 was launched October 24, 1998 aboard a Boeing Delta 7326 rocket from Cape Canaveral Air Station, FL. Deep Space 1 successfully completed and exceeded its mission objectives in July 1999 and flew by a near-Earth asteroid, Braille (1992 KD), in September 1999.Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Technology Development Overview
NASA Technical Reports Server (NTRS)
Hughes, Stephen J.; Cheatwood, F. McNeil; Calomino, Anthony M.; Wright, Henry S.; Wusk, Mary E.; Hughes, Monica F.
2013-01-01
The successful flight of the Inflatable Reentry Vehicle Experiment (IRVE)-3 has further demonstrated the potential value of Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This technology development effort is funded by NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). This paper provides an overview of a multi-year HIAD technology development effort, detailing the projects completed to date and the additional testing planned for the future.
Fiber pulling apparatus modification
NASA Technical Reports Server (NTRS)
Smith, Guy A.; Workman, Gary L.
1992-01-01
A reduced gravity fiber pulling apparatus (FPA) was constructed in order to study the effects of gravity on glass fiber formation. The apparatus was specifically designed and built for use on NASA's KC-135 aircraft. Four flights have been completed to date during which E-glass fiber was successfully produced in simulated zero, high, and lunar gravity environments. In addition simulated lunar soil samples were tested for their fiber producing properties using the FPA.
TVC actuator model. [for the space shuttle main engine
NASA Technical Reports Server (NTRS)
Baslock, R. W.
1977-01-01
A prototype Space Shuttle Main Engine (SSME) Thrust Vector Control (TVC) Actuator analog model was successfully completed. The prototype, mounted on five printed circuit (PC) boards, was delivered to NASA, checked out and tested using a modular replacement technique on an analog computer. In all cases, the prototype model performed within the recording techniques of the analog computer which is well within the tolerances of the specifications.
Shears, Tara
2012-02-28
The Standard Model is the theory used to describe the interactions between fundamental particles and fundamental forces. It is remarkably successful at predicting the outcome of particle physics experiments. However, the theory has not yet been completely verified. In particular, one of the most vital constituents, the Higgs boson, has not yet been observed. This paper describes the Standard Model, the experimental tests of the theory that have led to its acceptance and its shortcomings.
Results of the 1978 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Seaman, C. H.; Sidwell, L. B.
1979-01-01
The 1978 scheduled solar cell calibration balloon flight was successfully completed. Thirty six modules were carried to an altitude of above 36 kilometers. Recovery of telemetry and flight packages was without incident. These calibrated standard cells are used as reference standards in simulator testing of cells and arrays with similar spectral response characteristics. The factors affecting the spectral transmission of the atmosphere at various altitudes are summarized.
ERIC Educational Resources Information Center
Arden, Rosalind; Gottfredson, Linda S.; Miller, Geoffrey
2009-01-01
We suggest that an over-arching "fitness factor" (an index of general genetic quality that predicts survival and reproductive success) partially explains the observed associations between health outcomes and intelligence. As a proof of concept, we tested this idea in a sample of 3654 US Vietnam veterans aged 31-49 who completed five cognitive…
ERIC Educational Resources Information Center
Dockrell, Julie E.; Lindsay, Geoff; Palikara, Olympia
2011-01-01
The relationships are explored between language and literacy and academic success at 16 years in an English sample of 62 young people with a history of specific language impairment identified at 8 years. Data were available from national assessments at 16 and 14; in addition the pupils had completed a range of standardized tests to examine…
King, Chih-Hung; Chen, Tiffany L; Fan, Zhengqin; Glass, Jonathan D; Kemp, Charles C
2012-03-01
People with physical disabilities have ranked object retrieval as a high-priority task for assistive robots. We have developed Dusty, a teleoperated mobile manipulator that fetches objects from the floor and delivers them to users at a comfortable height. In this paper, we first demonstrate the robot's high success rate (98.4%) when autonomously grasping 25 objects considered being important by people with amyotrophic lateral sclerosis (ALS). We tested the robot with each object in five different configurations on five types of flooring. We then present the results of an experiment in which 20 people with ALS operated Dusty. Participants teleoperated Dusty to move around an obstacle, pick up an object and deliver the object to themselves. They successfully completed this task in 59 out of 60 trials (3 trials each) with a mean completion time of 61.4 SD = 20.5 seconds), and reported high overall satisfaction using Dusty (7-point Likert scale; 6.8 SD = 0.6). Participants rated Dusty to be significantly easier to use than their own hands, asking family members, and using mechanical reachers (p < 0.03, paired t-tests). Fourteen of the 20 participants reported that they would prefer using Dusty over their current methods. [Box: see text].
King, Chih-Hung; Chen, Tiffany L; Fan, Zhengqin; Glass, Jonathan D; Kemp, Charles C
2012-01-01
People with physical disabilities have ranked object retrieval as a high priority task for assistive robots. We have developed Dusty, a teleoperated mobile manipulator that fetches objects from the floor and delivers them to users at a comfortable height. In this paper, we first demonstrate the robot's high success rate (98.4%) when autonomously grasping 25 objects considered important by people with amyotrophic lateral sclerosis (ALS). We tested the robot with each object in five different configurations on five types of flooring. We then present the results of an experiment in which 20 people with ALS operated Dusty. Participants teleoperated Dusty to move around an obstacle, pick up an object, and deliver the object to themselves. They successfully completed this task in 59 out of 60 trials (3 trials each) with a mean completion time of 61.4 seconds (SD=20.5 seconds), and reported high overall satisfaction using Dusty (7-point Likert scale; 6.8 SD=0.6). Participants rated Dusty to be significantly easier to use than their own hands, asking family members, and using mechanical reachers (p < 0.03, paired t-tests). 14 of the 20 participants reported that they would prefer using Dusty over their current methods. PMID:22013888
Tu, Yunhai; Qian, Zhenbin; Zhang, Jiao; Wu, Wencan; Xiao, Tianlin
2015-01-01
Purpose. The aim of this study is to propose a simple and efficient combination surgery for the management of dacryocystitis with canalicular obstruction. Methods. A retrospective noncomparative case series of dacryocystitis with canalicular obstruction has been studied. Twelve patients with dacryocystitis and canalicular obstruction underwent a conventional endoscopic endonasal dacryocystorhinostomy (EE-DCR) combined with a modified canalicular repair. Postoperative observations included slit lamp, fluorescein dye disappearance test, lacrimal syringing, lacrimal endoscopy, and nasal endoscopy. Results. After 6-18 months of postoperative follow-up, the symptoms of epiphora and mucopurulent discharge disappeared completely in 10 patients, and occasional or intermittent epiphora remained in 2 patients. All of the twelve patients showed an opened intranasal ostium and normal fluorescein dye disappearance test. Patent bicanalicular irrigation was achieved in 9 patients. One patient had a partial and the other two had a complete reobstruction by lacrimal irrigation to their repaired lower canaliculus; however, all of them had a patent lacrimal irrigation to upper canaliculus. The functional success rate for the combination surgery is 83% (10/12), and anatomical success rate is 75% (9/12). Conclusion. EE-DCR combined with modified canalicular repair is a simple and efficient method for the management of dacryocystitis with canalicular obstruction.
Re-examining the effects of noncontingent success on self-handicapping behaviour.
Thompson, Ted
2004-06-01
Self-handicapping refers to the practice on the part of certain individuals to handicap their performance when poor performance is likely to reveal low ability. Noncontingent success (feedback that is inflated relative to performance) is more likely to promote self-handicapping behaviour than noncontingent failure (failure feedback based on false or misleading information). However, the reasons for the differing effects of these forms of performance feedback on self-handicapping behaviour remain obscure. The present study sought an explanation for the differing effects of these forms of performance feedback, testing the assumption that students high in self-handicapping behaviour would react more negatively following noncontingent success, reporting more unstable and external attributions, higher anxiety, and a greater propensity to claim handicaps than those low in self-handicapping behaviour. No differences were expected on any of these measures for high relative to low self-handicappers following either noncontingent failure or success. Participants were 72 undergraduate students, divided equally between high and low self-handicapping groups. High and low self-handicappers were assigned to one of three performance feedback conditions: noncontingent failure, success and noncontingent success. High and low self-handicappers were then given an opportunity to claim handicaps prior to completing measures of attributions and state anxiety. Subsequently, they completed 12 remote associate tasks, serving as an assessment of performance, and 16 unicursal tasks, assessing practice effort. Following noncontingent success, high self-handicappers reported greater anxiety, more unproductive attributions and claimed more handicaps than low self-handicappers. However no differences were evident for high and low self-handicappers following either noncontingent failure or success. High self-handicappers also performed poorly on the remote associates tasks and reduced practice effort on the unicursal tasks. These findings confirm the adverse effects of noncontingent success for high self-handicappers, while failing to provide evidence that noncontingent failure has any more adverse effects on high relative to low self-handicappers.
College Student Disposition and Academic Self-Efficacy
ERIC Educational Resources Information Center
Conner, Timothy W., II; Skidmore, Ronald L.; Aagaard, Lola
2012-01-01
Dispositional optimism is an adopted orientation in which one believes that goals will generally be attained and that tasks can generally be successfully completed, whereas pessimists orient toward less belief in successful task or goal completion. A related concept, individuals with high self-efficacy believe they will be successful at particular…
Cryogenic Photogrammetry and Radiometry for the James Webb Space Telescope Microshutters
NASA Technical Reports Server (NTRS)
Chambers, Victor J.; Morey, Peter A.; Zukowski, Barbara J.; Kutyrev, Alexander S.; Collins, Nicholas R.
2012-01-01
The James Webb Space Telescope (JWST) relies on several innovations to complete its five year mission. One vital technology is microshutters, the programmable field selectors that enable the Near Infrared Spectrometer (NIRSpec) to perform multi-object spectroscopy. Mission success depends on acquiring spectra from large numbers of galaxies by positioning shutter slits over faint targets. Precise selection of faint targets requires field selectors that are both high in contrast and stable in position. We have developed test facilities to evaluate microshutter contrast and alignment stability at their 35K operating temperature. These facilities used a novel application of image registration algorithms to obtain non-contact, sub-micron measurements in cryogenic conditions. The cryogenic motion of the shutters was successfully characterized. Optical results also demonstrated that shutter contrast far exceeds the NIRSpec requirements. Our test program has concluded with the delivery of a flight-qualified field selection subsystem to the NIRSpec bench.
LISA Pathfinder: An important first step towards a space-based gravitational wave observatory
NASA Astrophysics Data System (ADS)
Thorpe, James
2017-08-01
ESA's LISA Pathfinder mission was launched on Dec 3rd, 2015 and completed earlier this Summer. During this relatively short mission, Pathfinder at its two science payloads, Europe's LISA Technology Package and NASA's Disturbance Reduction System, demonstrated several techniques and technologies that enable development of a future space-based gravitational wave observatory. Most notably, Pathfinder demonstrated that the technique of drag-free flight could be utilized to place a test mass in near-perfect free-fall, with residual accelerations at the femto-g level in the milliHertz band. Additionally, technologies such as precision bonded optical structures for metrology, micropropulsion systems, and non-contact charge control, were successfully tested, retiring risk for LISA. In this talk, I will present an overview of Pathfinder's results to date and some perspective on how this success will be leveraged into realizing LISA.
Demonstrating artificial intelligence for space systems - Integration and project management issues
NASA Technical Reports Server (NTRS)
Hack, Edmund C.; Difilippo, Denise M.
1990-01-01
As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.
Design and test of a high performance off-axis TMA telescope
NASA Astrophysics Data System (ADS)
Fan, Bin; Cai, Wei-jun; Huang, Ying
2017-11-01
A new complete Optical Demonstration Model (ODM) of high performance off-axis Three Mirror Anastigmatic (TMA) telescope has been successfully developed in BISME. This 1.75-m focal length, 1/9 relative aperture, 6.2°×1.0°field of view visible telescope, which uses the TDICCD detectors of 7μm pixel size, can provide 2.0-m ground sampling distance and 51-km swath from an altitude of 500 km. With some significant efforts, the main goals of the ODM have been reached: a compact lightweight design while realizing high performance and high stability. The optical system and key technologies have been applied in the multispectral camera of ZY-3 Satellite (the first high resolution stereo mapping satellite of China), which was successfully launched on January 9th, 2012. The main technology of ODM was described. The test results and applications were outlined.
NASA Technical Reports Server (NTRS)
Sass, J. P.; Raines, N. G.; Ryan, H. M.
2004-01-01
The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program recently achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in late 2004. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD Workhorse Preburner and the IPD Oxidizer Turbopump. In addition, some of the facility challenges encountered during the test project shall be addressed.
Heater Validation for the NEXT-C Hollow Cathodes
NASA Technical Reports Server (NTRS)
Verhey, Timothy R.; Soulas, George C.; Mackey, Jonathan Ar.
2017-01-01
Swaged cathode heaters whose design was successfully demonstrated under a prior flight project are to be provided by the NASA Glenn Research Center for the NEXT-C ion thruster being fabricated by Aerojet Rocketdyne. Extensive requalification activities were performed to validate process controls that had to be re-established or revised because systemic changes prevented reuse of the past approaches. A development batch of heaters was successfully fabricated based on the new process controls. Acceptance and cyclic life testing of multiple discharge and neutralizer sized heaters extracted from the development batch was initiated in August, 2016, with the last heater completing testing in April, 2017. Cyclic life testing results substantially exceeded the NEXT-C thruster requirement as well as all past experience for GRC fabricated units. The heaters demonstrated ultimate cyclic life capability of 19050 to 33500 cycles. A qualification batch of heaters is now being fabricated using the finalized process controls. A set of six heaters will be acceptance and cyclic tested to verify conformance to the behavior observed with the development heaters. The heaters for flight use will be then be provided to the contractor. This paper summarizes the fabrication process control activities and the acceptance and life testing of the development heater units.
New techniques for test development for tactical auto-pilots using microprocessors
NASA Astrophysics Data System (ADS)
Shemeta, E. H.
1980-07-01
This paper reports on a demonstration of the application of the method to generate system level tests for a typical tactical missile autopilot. The test algorithms are based on the autopilot control law. When loaded on the tester with appropriate control information, the complete autopilot is tested to establish if the specified control law requirements are met. Thus, the test procedure not only checks to see if the hardware is functional, but also checks the operational software. The technique also uses a 'learning' mode to allow minor timing or functional deviations from the expected responses to be incorporated in the test procedures. A potential application of this test development technique is the extraction of production test data for the various subassemblies. The technique will 'learn' the input-output patterns forming the basis for developement and production tests. If successful, these new techniques should allow the test development process to keep pace with semiconductor progress.
Thermal cycle testing of Space Station Freedom solar array blanket coupons
NASA Technical Reports Server (NTRS)
Scheiman, David A.; Schieman, David A.
1991-01-01
Lewis Research Center is presently conducting thermal cycle testing of solar array blanket coupons that represent the baseline design for Space Station Freedom. Four coupons were fabricated as part of the Photovoltaic Array Environment Protection (PAEP) Program, NAS 3-25079, at Lockheed Missile and Space Company. The objective of the testing is to demonstrate the durability or operational lifetime of the solar array welded interconnect design within the durability or operational lifetime of the solar array welded interconnect design within a low earth orbit (LEO) thermal cycling environment. Secondary objectives include the observation and identification of potential failure modes and effects that may occur within the solar array blanket coupons as a result of thermal cycling. The objectives, test articles, test chamber, performance evaluation, test requirements, and test results are presented for the successful completion of 60,000 thermal cycles.
Webb Telescope Passes Important Optical Test on This Week @NASA – May 5, 2017
2017-05-05
NASA’s James Webb Space Telescope (JWST) has successfully passed the center of curvature test at Goddard Space Flight Center, in Greenbelt, Md. This important optical measurement of Webb’s fully assembled primary mirror was the final test held at Goddard before the telescope is shipped off for end-to-end cryogenic testing at Johnson Space Center in Houston. When that’s complete, the world’s most advanced observatory goes to Northrop Grumman Aerospace Systems in Redondo Beach, California, for final assembly and testing. Webb is targeted for launch in 2018 on a mission to help unravel some of the greatest mysteries of the universe. Also, Cassini Update, NASA Visits Midwest Company Helping Build Orion, Orion’s Launch Abort System Motor Tested, Wind Tunnel Tests Continue with SLS, and Community College Aerospace Scholars!
IDEAS and App Development Internship in Hardware and Software Design
NASA Technical Reports Server (NTRS)
Alrayes, Rabab D.
2016-01-01
In this report, I will discuss the tasks and projects I have completed while working as an electrical engineering intern during the spring semester of 2016 at NASA Kennedy Space Center. In the field of software development, I completed tasks for the G-O Caching Mobile App and the Asbestos Management Information System (AMIS) Web App. The G-O Caching Mobile App was written in HTML, CSS, and JavaScript on the Cordova framework, while the AMIS Web App is written in HTML, CSS, JavaScript, and C# on the AngularJS framework. My goals and objectives on these two projects were to produce an app with an eye-catching and intuitive User Interface (UI), which will attract more employees to participate; to produce a fully-tested, fully functional app which supports workforce engagement and exploration; to produce a fully-tested, fully functional web app that assists technicians working in asbestos management. I also worked in hardware development on the Integrated Display and Environmental Awareness System (IDEAS) wearable technology project. My tasks on this project were focused in PCB design and camera integration. My goals and objectives for this project were to successfully integrate fully functioning custom hardware extenders on the wearable technology headset to minimize the size of hardware on the smart glasses headset for maximum user comfort; to successfully integrate fully functioning camera onto the headset. By the end of this semester, I was able to successfully develop four extender boards to minimize hardware on the headset, and assisted in integrating a fully-functioning camera into the system.
Preparing for Combat Readiness for the Fight: Physical Performance Profile of Female U.S. Marines.
Kelly, Karen R; Jameson, Jason T
2016-03-01
Females have been restricted from serving in direct combat arms' positions for decades. One reason for the exclusion derives from the perceived physical demands of these positions. As a result, many current efforts are directed toward defining the physical demands of combat arms' positions. The purpose of this study was to develop a physical performance and body composition profile of females who could overcome the physical demands of combat tasks that rely primarily on upper body strength. This study is based on an analysis of archival data from 2 separate samples of active-duty female Marines (n = 802), who had been recruited to participate in heavy lifting tasks. These tasks included lifting a heavy machine gun (HMG) lift (cohort 1, n = 423) and Clean and Press lifts (29.5-52.3 kg) (cohort 2, n = 379). To develop the physical performance profile, data from annual physical fitness tests were collected, which included run times, ammunition can lift, 804. Seven-meter (880-yard) movement to contact, and the maneuver under fire. In cohort 1, 65 females (∼15%; n = 423 females) successfully completed HMG; in cohort 2, 33 females (∼9%; n = 379 females) successfully completed another strength task, a Clean and Press of 52.3 kg. In both samples, female Marines who were successful on these tasks also outperformed their unsuccessful counterparts on the annual physical fitness tests. In addition, larger females typically outperformed their smaller counterparts. Females seeking assignment to closed combat arms' positions would thus be well served by targeting upper body strength, while maintaining overall physical fitness.
Hypnosis for the control of pain associated with external cephalic version: a comparative study.
Guittier, Marie-Julia; Guillemin, Francis; Farinelli, Edith Brandao; Irion, Olivier; Boulvain, Michel; de Tejada, Begoña Martinez
2013-10-01
To assess the effectiveness of hypnosis to reduce pain and facilitate external cephalic version (ECV). Cohort study. Geneva University Hospitals, Switzerland. 63 women attempting ECV under hypnosis from 2010 to 2011 were compared with 122 women who received standard care from 2005 through 2008. Immediately after the ECV attempt, both groups completed the same questionnaire evaluating the participants' pain (visual analogue and verbal rating scales) and experience with the procedure. Physicians also completed a questionnaire that elicited their views on the effect of hypnosis on the intervention. A chi-squared test was used to compare differences in proportions, and the Mann-Whitney U test was used for differences in continuous variables. A thematic content analysis of the obstetricians' responses to the open question regarding their experience of hypnotist accompaniment was also performed. Pain evaluated by women (visual analogue and verbal rating scales) and success rate of ECV. Pain intensity reported by women did not significantly differ between the hypnosis group and the standard care group (visual analogue scale score, 6.0 versus 6.3, respectively; p=.25; difference for verbal rating scale, p=0.31. In 72% of cases, physicians reported that hypnosis facilitated the procedure. The success rates in both groups were not significantly different (30% with hypnosis compared with 38% without; p=.31). Most women in both groups found the ECV attempt painful and a source of anxiety but would undergo it again if necessary. Hypnosis accompaniment during ECV does not reduce pain intensity associated with the procedure or improve the probability of a successful version.
McGee, John Christopher; Wilson, Eric; Barela, Haley; Blum, Sharon
2017-03-01
Air Liaison Officer Aptitude Assessment (AAA) attrition is often associated with a lack of candidate physical preparation. The Functional Movement Screen, Tactical Fitness Assessment, and fitness metrics were collected (n = 29 candidates) to determine what physical factors could predict a candidate s success in completing AAA. Between-group comparisons were made between candidates completing AAA versus those who did not (p < 0.05). Upper 50% thresholds were established for all variables with R 2 < 0.8 and the data were converted to a binary form (0 = did not attain threshold, 1 = attained threshold). Odds-ratios, pre/post-test probabilities and positive likelihood ratios were computed and logistic regression applied to explain model variance. The following variables provided the most predictive value for AAA completion: Pull-ups (p = 0.01), Sit-ups (p = 0.002), Relative Powerball Toss (p = 0.017), and Pull-ups × Sit-ups interaction (p = 0.016). Minimum recommended guidelines for AAA screening are Pull-ups (10 maximum), Sit-ups (76/2 minutes), and a Relative Powerball Toss of 0.6980 ft × lb/BW. Associated benefits could be higher graduation rates, and a cost-savings associated from temporary duty and possible injury care for nonselected candidates. Recommended guidelines should be validated in future class cycles. Reprint & Copyright © 2017 Association of Military Surgeons of the U.S.
Final Report: CNC Micromachines LDRD No.10793
DOE Office of Scientific and Technical Information (OSTI.GOV)
JOKIEL JR., BERNHARD; BENAVIDES, GILBERT L.; BIEG, LOTHAR F.
2003-04-01
The three-year LDRD ''CNC Micromachines'' was successfully completed at the end of FY02. The project had four major breakthroughs in spatial motion control in MEMS: (1) A unified method for designing scalable planar and spatial on-chip motion control systems was developed. The method relies on the use of parallel kinematic mechanisms (PKMs) that when properly designed provide different types of motion on-chip without the need for post-fabrication assembly, (2) A new type of actuator was developed--the linear stepping track drive (LSTD) that provides open loop linear position control that is scalable in displacement, output force and step size. Several versionsmore » of this actuator were designed, fabricated and successfully tested. (3) Different versions of XYZ translation only and PTT motion stages were designed, successfully fabricated and successfully tested demonstrating absolutely that on-chip spatial motion control systems are not only possible, but are a reality. (4) Control algorithms, software and infrastructure based on MATLAB were created and successfully implemented to drive the XYZ and PTT motion platforms in a controlled manner. The control software is capable of reading an M/G code machine tool language file, decode the instructions and correctly calculate and apply position and velocity trajectories to the motion devices linear drive inputs to position the device platform along the trajectory as specified by the input file. A full and detailed account of design methodology, theory and experimental results (failures and successes) is provided.« less
Recruitment strategies in two Reproductive Medicine Network infertility trials
Usadi, Rebecca S.; Diamond, Michael P.; Legro, Richard S.; Schlaff, William D.; Hansen, Karl R.; Casson, Peter; Christman, Gregory; Bates, G. Wright; Baker, Valerie; Seungdamrong, Aimee; Rosen, Mitchell P.; Lucidi, Scott; Thomas, Tracey; Huang, Hao; Santoro, Nanette; Eisenberg, Esther; Zhang, Heping; Alvero, Ruben
2016-01-01
Background Recruitment of individuals into clinical trials is a critical step in completing studies. Reports examining the effectiveness of different recruitment strategies, and specifically in infertile couples, are limited. Methods We investigated recruitment methods used in two NIH sponsored trials, Pregnancy in Polycystic Ovary Syndrome (PPCOS II) and Assessment of Multiple Intrauterine Gestations from Ovarian Stimulation (AMIGOS), and examined which strategies yielded the greatest number of participants completing the trials. Results 3683 couples were eligible for screening. 1650 participants were randomized and 1339 completed the trials. 750 women were randomized in PPCOS II; 212 of the participants who completed the trial were referred by physicians. Participants recruited from radio ads (84/750) and the internet (81/750) resulted in similar rates of trial completion in PPCOS II. 900 participants were randomized in AMIGOS. 440 participants who completed the trial were referred to the study by physicians. The next most successful method in AMIGOS was use of the internet, achieving 78 completed participants. Radio ads proved the most successful strategy in both trials for participants who earned <$50,000 annually. Radio ads were most successful in enrolling white patients in PPCOS II and black patients in AMIGOS. Seven ancillary Clinical Research Scientist Training (CREST) sites enrolled 324 of the participants who completed the trials. Conclusions Physician referral was the most successful recruitment strategy. Radio ads and the internet were the next most successful strategies, particularly for women of limited income. Ancillary clinical sites were important for overall recruitment. PMID:26386293
Recruitment strategies in two reproductive medicine network infertility trials.
Usadi, Rebecca S; Diamond, Michael P; Legro, Richard S; Schlaff, William D; Hansen, Karl R; Casson, Peter; Christman, Gregory; Wright Bates, G; Baker, Valerie; Seungdamrong, Aimee; Rosen, Mitchell P; Lucidi, Scott; Thomas, Tracey; Huang, Hao; Santoro, Nanette; Eisenberg, Esther; Zhang, Heping; Alvero, Ruben
2015-11-01
Recruitment of individuals into clinical trials is a critical step in completing studies. Reports examining the effectiveness of different recruitment strategies, and specifically in infertile couples, are limited. We investigated recruitment methods used in two NIH sponsored trials, Pregnancy in Polycystic Ovary Syndrome (PPCOS II) and Assessment of Multiple Intrauterine Gestations from Ovarian Stimulation (AMIGOS), and examined which strategies yielded the greatest number of participants completing the trials. 3683 couples were eligible for screening. 1650 participants were randomized and 1339 completed the trials. 750 women were randomized in PPCOS II; 212 of the participants who completed the trial were referred by physicians. Participants recruited from radio ads (84/750) and the internet (81/750) resulted in similar rates of trial completion in PPCOS II. 900 participants were randomized in AMIGOS. 440 participants who completed the trial were referred to the study by physicians. The next most successful method in AMIGOS was the use of the internet, achieving 78 completed participants. Radio ads proved the most successful strategy in both trials for participants who earned <$50,000 annually. Radio ads were most successful in enrolling white patients in PPCOS II and black patients in AMIGOS. Seven ancillary Clinical Research Scientist Training (CREST) sites enrolled 324 of the participants who completed the trials. Physician referral was the most successful recruitment strategy. Radio ads and the internet were the next most successful strategies, particularly for women of limited income. Ancillary clinical sites were important for overall recruitment. Copyright © 2015 Elsevier Inc. All rights reserved.
Pacheco, Wendy I.; Noel, Richard J.; Porter, James T.; Appleyard, Caroline B.
2015-01-01
The use and validity of the Graduate Record Examination General Test (GRE) to predict the success of graduate school applicants is heavily debated, especially for its possible impact on the selection of underrepresented minorities into science, technology, engineering, and math fields. To better identify candidates who would succeed in our program with less reliance on the GRE and grade point average (GPA), we developed and tested a composite score (CS) that incorporates additional measurable predictors of success to evaluate incoming applicants. Uniform numerical values were assigned to GPA, GRE, research experience, advanced course work or degrees, presentations, and publications. We compared the CS of our students with their achievement of program goals and graduate school outcomes. The average CS was significantly higher in those students completing the graduate program versus dropouts (p < 0.002) and correlated with success in competing for fellowships and a shorter time to thesis defense. In contrast, these outcomes were not predicted by GPA, science GPA, or GRE. Recent implementation of an impromptu writing assessment during the interview suggests the CS can be improved further. We conclude that the CS provides a broader quantitative measure that better predicts success of students in our program and allows improved evaluation and selection of the most promising candidates. PMID:25828404
Current status and some future test directions for the U.S. National Transonic Facility
NASA Technical Reports Server (NTRS)
Gloss, Blair B.
1992-01-01
The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of the tunnel systems were performed over the following two years. In August 1984, the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamics calibration and testing to commence. Since 1984 several operational problems have been identified and successfully solved which is demonstrated by the fact that the facility has operated the last year with no significant facility down times. Also during this time period, development of test techniques and instrumentation has continued. This paper will review some of the recent test techniques and instrumentation developments, and will briefly review the status of the facility.
Desiccant humidity control system. [for space shuttle cabins
NASA Technical Reports Server (NTRS)
Lunde, P. J.; Kester, F. L.
1975-01-01
A water vapor and carbon dioxide sorbent material (designated HS-C) was developed for potential application to the space shuttle and tested at full scale. Capacities of two percent for carbon dioxide and four percent for water vapor were achieved using space shuttle cabin adsorption conditions and a space vacuum for desorption. Performance testing shows that water vapor can be controlled by varying the air process flow, while maintaining the ability to remove carbon dioxide. A 2000 hour life test was successfully completed, as were tests for sensitivity to cleaning solvent vapors, vibration resistance, and flammability. A system design for the space shuttle shows a 200 pound weight advantage over competitive systems and an even larger advantage for longer missions.
Energy efficient engine high-pressure turbine component rig performance test report
NASA Technical Reports Server (NTRS)
Leach, K. P.
1983-01-01
A rig test of the cooled high-pressure turbine component for the Energy Efficient Engine was successfully completed. The principal objective of this test was to substantiate the turbine design point performance as well as determine off-design performance with the interaction of the secondary flow system. The measured efficiency of the cooled turbine component was 88.5 percent, which surpassed the rig design goal of 86.5 percent. The secondary flow system in the turbine performed according to the design intent. Characterization studies showed that secondary flow system performance is insensitive to flow and pressure variations. Overall, this test has demonstrated that a highly-loaded, transonic, single-stage turbine can achieve a high level of operating efficiency.
Hefty tests buoy Philippine oil sector
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-13
This paper reports that Alcorn International Inc., Houston, has disclosed a test of another hefty oil flow off Philippines. Alcorn last month completed its third high flowing delineation well in the West Linapacan area off Palawan Island. Development of West Linapacan field will help boost lagging Philippines oil production, which fell 31% in 1991 from 1990 levels. Philippines Office of Energy Affairs (OEA) also outlined other aspects of the country's oil and gas activity in 1991. Recent drilling successes have redirected the country's focus north to the West Linapacan area from older Northwest Palawan oil fields. Meantime, two geophysical surveymore » and exploration contracts (GSECs) were awarded in 1991, and two service contracts (SCs) were relinquished during the year. Several seismic program were completed last year, and in agreement between Australia and Philippines will yield added seismic data during the next 3 years.« less
Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing
NASA Technical Reports Server (NTRS)
Watts, Carly; Vogel, Matthew
2016-01-01
Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.
Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing
NASA Technical Reports Server (NTRS)
Anchondo, Ian; Cox, Marlon; Meginnis, Carly; Westheimer, David; Vogel, Matt R.
2016-01-01
Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.
Launch vehicle tracking enhancement through Global Positioning System Metric Tracking
NASA Astrophysics Data System (ADS)
Moore, T. C.; Li, Hanchu; Gray, T.; Doran, A.
United Launch Alliance (ULA) initiated operational flights of both the Atlas V and Delta IV launch vehicle families in 2002. The Atlas V and Delta IV launch vehicles were developed jointly with the US Air Force (USAF) as part of the Evolved Expendable Launch Vehicle (EELV) program. Both Launch Vehicle (LV) families have provided 100% mission success since their respective inaugural launches and demonstrated launch capability from both Vandenberg Air Force Base (VAFB) on the Western Test Range and Cape Canaveral Air Force Station (CCAFS) on the Eastern Test Range. However, the current EELV fleet communications, tracking, & control architecture & technology, which date back to the origins of the space launch business, require support by a large and high cost ground footprint. The USAF has embarked on an initiative known as Future Flight Safety System (FFSS) that will significantly reduce Test Range Operations and Maintenance (O& M) cost by closing facilities and decommissioning ground assets. In support of the FFSS, a Global Positioning System Metric Tracking (GPS MT) System based on the Global Positioning System (GPS) satellite constellation has been developed for EELV which will allow both Ranges to divest some of their radar assets. The Air Force, ULA and Space Vector have flown the first 2 Atlas Certification vehicles demonstrating the successful operation of the GPS MT System. The first Atlas V certification flight was completed in February 2012 from CCAFS, the second Atlas V certification flight from VAFB was completed in September 2012 and the third certification flight on a Delta IV was completed October 2012 from CCAFS. The GPS MT System will provide precise LV position, velocity and timing information that can replace ground radar tracking resource functionality. The GPS MT system will provide an independent position/velocity S-Band telemetry downlink to support the current man-in-the-loop ground-based commanded destruct of an anomalous flight- The system utilizes a 50 channel digital receiver capable of navigating in high dynamic environments and high altitudes fed by antennas mounted diametrically opposed on the second stage airframe skin. To enhance cost effectiveness, the GPS MT System design implemented existing commercial parts and common environmental and interface requirements for both EELVs. The EELV GPS MT System design is complete, successfully qualified and has demonstrated that the system performs as simulated. This paper summarizes the current development status, system cost comparison, and performance capabilities of the EELV GPS MT System.
D'Arcy, Shona; Rapcan, Viliam; Gali, Alessandra; Burke, Nicola; O'Connell, Gloria Crispino; Robertson, Ian H; Reilly, Richard B
2013-01-01
Cognitive assessments are valuable tools in assessing neurological conditions. They are critical in measuring deficits in cognitive function in an array of neurological disorders and during the ageing process. Automation of cognitive assessments is one way to address the increasing burden on medical resources for an ever increasing ageing population. This study investigated the suitability of using automated Interactive Voice Response (IVR) technology to deliver a suite of cognitive assessments to older adults using speech as the input modality. Several clinically valid and gold-standard cognitive assessments were selected for implementation in the IVR application. The IVR application was designed using human centred design principles to ensure the experience was as user friendly as possible. Sixty one participants completed two IVR assessments and one face to face (FF) assessment with a neuropsychologist. Completion rates for individual tests were inspected to identify those tests that are most suitable for administration via IVR technology. Interclass correlations were calculated to assess the reliability of the automated administration of the cognitive assessments across delivery modes. While all participants successfully completed all automated assessments, variability in the completion rates for different cognitive tests was observed. Statistical analysis found significant interclass correlations for certain cognitive tests between the different modes of administration. Analysis also suggests that an initial FF assessment reduces the variability in cognitive test scores when introducing automation into such an assessment. [corrected] This study has demonstrated the functional and cognitive reliability of administering specific cognitive tests using an automated, speech driven application. This study has defined the characteristics of existing cognitive tests that are suitable for such an automated delivery system and also informs on the limitations of other cognitive tests for this modality. This study presents recommendations for developing future large scale cognitive assessments.
Production Facility Prototype Blower 1000 Hour Test Results II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wass, Alexander Joseph; Woloshun, Keith Albert; Dale, Gregory E.
Long duration tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks were not included in these tests. Five 1000 hour tests have been completed since the first test was performed in January of 2016. All five 1000 hour tests have proven successful in exposing preventable issues relatedmore » to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for each test, including a review of the first and second tests, are included in this report.« less
Vallila-Rohter, Sofia; Kiran, Swathi
2015-08-01
Our purpose was to study strategy use during nonlinguistic category learning in aphasia. Twelve control participants without aphasia and 53 participants with aphasia (PWA) completed a computerized feedback-based category learning task consisting of training and testing phases. Accuracy rates of categorization in testing phases were calculated. To evaluate strategy use, strategy analyses were conducted over training and testing phases. Participant data were compared with model data that simulated complex multi-cue, single feature, and random pattern strategies. Learning success and strategy use were evaluated within the context of standardized cognitive-linguistic assessments. Categorization accuracy was higher among control participants than among PWA. The majority of control participants implemented suboptimal or optimal multi-cue and single-feature strategies by testing phases of the experiment. In contrast, a large subgroup of PWA implemented random patterns, or no strategy, during both training and testing phases of the experiment. Person-to-person variability arises not only in category learning ability but also in the strategies implemented to complete category learning tasks. PWA less frequently developed effective strategies during category learning tasks than control participants. Certain PWA may have impairments of strategy development or feedback processing not captured by language and currently probed cognitive abilities.
Benefits attained from space flight in pre-clinical evaluation of candidate drugs
NASA Astrophysics Data System (ADS)
Stodieck, Louis S.; Bateman, Ted; Ayers, Reed; Ferguson, Virginia; Simske, Steve
1998-01-01
Modern medicine has made great strides in recent decades. The promises of biotechnology and advances in gene identification and manipulation offer tremendous potential for treatment of disease. However, developing new drug therapies by biotechnology and pharmaceutical companies is still a very costly and time consuming process. One of the important milestones in drug development is the successful completion of preclinical evaluation. During this phase, drug candidates must be shown to be safe, yet effective as a treatment of the target disease or disorder. Critical for preclinical testing is the availability of biomedical test models that adequately mimic the target disease. A good model will 1) allow confident prediction of a drug's effects before expensive clinical trials are begun, 2) provide convincing data for use in an FDA new drug application and 3) minimize the time required for testing. Space flight may offer a completely unique and new set of biomedical models for use in pharmaceutical testing. This paper highlights some examples of recent experiments done in space to test new compounds for Chiron, (Emmeryville, CA) and discusses the importance of the International Space Station to greatly expand such commercial opportunities.
Rectifier cabinet static breaker
Costantino, Jr, Roger A.; Gliebe, Ronald J.
1992-09-01
A rectifier cabinet static breaker replaces a blocking diode pair with an SCR and the installation of a power transistor in parallel with the latch contactor to commutate the SCR to the off state. The SCR serves as a static breaker with fast turnoff capability providing an alternative way of achieving reactor scram in addition to performing the function of the replaced blocking diodes. The control circuitry for the rectifier cabinet static breaker includes on-line test capability and an LED indicator light to denote successful test completion. Current limit circuitry provides high-speed protection in the event of overload.
The Partnership: a History of the Apollo-Soyuz Test Project
NASA Technical Reports Server (NTRS)
Ezell, E. C.; Ezell, L. N.
1978-01-01
Correspondance, interviews, official documents, and other published materials were used to trace the evolution of the Apollo Soyuz Test Project from the initial proposal for international cooperation in space use and exploration until the successful completion of the joint Soviet-American mission. Conceptual drawings of proposed docking modules and mechanisms are presented and dicussed. Black and white photographs taken during mission planning and in-flight activities are included with color photographs of the earth taken during the mission. Joint meetings are summarized and the scientific experiments and launch vehicles are discussed in the appendices.
Using virtual reality for science mission planning: A Mars Pathfinder case
NASA Technical Reports Server (NTRS)
Kim, Jacqueline H.; Weidner, Richard J.; Sacks, Allan L.
1994-01-01
NASA's Mars Pathfinder Project requires a Ground Data System (GDS) that supports both engineering and scientific payloads with reduced mission operations staffing, and short planning schedules. Also, successful surface operation of the lander camera requires efficient mission planning and accurate pointing of the camera. To meet these challenges, a new software strategy that integrates virtual reality technology with existing navigational ancillary information and image processing capabilities. The result is an interactive workstation based applications software that provides a high resolution, 3-dimensial, stereo display of Mars as if it were viewed through the lander camera. The design, implementation strategy and parametric specification phases for the development of this software were completed, and the prototype tested. When completed, the software will allow scientists and mission planners to access simulated and actual scenes of Mars' surface. The perspective from the lander camera will enable scientists to plan activities more accurately and completely. The application will also support the sequence and command generation process and will allow testing and verification of camera pointing commands via simulation.
Ultrasonic interface level analyzer shop test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
STAEHR, T.W.
1999-05-24
The Royce Instrument Corporation Model 2511 Interface Level Analyzer (URSILLA) system uses an ultrasonic ranging technique (SONAR) to measure sludge depths in holding tanks. Three URSILLA instrument assemblies provided by the W-151 project are planned to be used during mixer pump testing to provide data for determining sludge mobilization effectiveness of the mixer pumps and sludge settling rates. The purpose of this test is to provide a documented means of verifying that the functional components of the three URSILLA instruments operate properly. Successful completion of this Shop Test Procedure (STP) is a prerequisite for installation in the AZ-101 tank. Themore » objective of the test is to verify the operation of the URSILLA instruments and to verify data collection using a stand alone software program.« less
ERIC Educational Resources Information Center
Venville, Annie; Street, Annette
2012-01-01
Researchers from La Trobe University are investigating the factors affecting successful course completion for Vocational Education and Training (VET) students with a mental illness. The research aims to: (1) Increase individuals' understanding of the factors contributing to successful course completions by students with disclosed or non-disclosed…
Supporting Student Retention and Success: Including Family Areas in an Academic Library
ERIC Educational Resources Information Center
Godfrey, Ian; Rutledge, Lorelei; Mowdood, Alfred; Reed, Jacob; Bigler, Scott; Soehner, Catherine
2017-01-01
Many universities and colleges focus on student retention and completion as a measure of their success. Publications such as the "Chronicle of Higher Education" carry an increasing number of articles dealing with student retention, success, and completion. Academic libraries support this goal through a wide variety of services, teaching,…
2-kW Solar Dynamic Space Power System Tested in Lewis' Thermal Vacuum Facility
NASA Technical Reports Server (NTRS)
1995-01-01
Working together, a NASA/industry team successfully operated and tested a complete solar dynamic space power system in a large thermal vacuum facility with a simulated sun. This NASA Lewis Research Center facility, known as Tank 6 in building 301, accurately simulates the temperatures, high vacuum, and solar flux encountered in low-Earth orbit. The solar dynamic space power system shown in the photo in the Lewis facility, includes the solar concentrator and the solar receiver with thermal energy storage integrated with the power conversion unit. Initial testing in December 1994 resulted in the world's first operation of an integrated solar dynamic system in a relevant environment.
Utilization of ERTS-1 data to monitor and classify eutrophication of inland lakes
NASA Technical Reports Server (NTRS)
Chase, P. E. (Principal Investigator)
1973-01-01
The author has identified the following significant results. Bands 6 and 7 have fine structure as obtained by proper selection of digital levels in processing the CCT's. This is contrary to the imagery density received. This means that the small lakes can be classified in IR for different types of water masses. At least four distinct water masses have been determined for test lakes. They are shoreline, shallow water, and two deep waters. One deep water is patchy and presents difficulty in training set selection. The excellent weather and a completely successful field test form a significant happening. It required 12 orbits over the test area before perfect weather occurred.
A Module Experimental Process System Development Unit (MEPSDU)
NASA Technical Reports Server (NTRS)
1981-01-01
Subsequent to the design review, a series of tests was conducted on simulated modules to demonstrate that all environmental specifications (wind loading, hailstone impact, thermal cycling, and humidity cycling) are satisfied by the design. All tests, except hailstone impact, were successfully completed. The assembly sequence was simplified by virtue of eliminating the frame components and assembly steps. Performance was improved by reducing the module edge border required to accommodate the frame of the preliminary design module. An ultrasonic rolling spot bonding technique was selected for use in the machine to perform the aluminum interconnect to cell metallization electrical joints required in the MEPSDU module configuration. This selection was based on extensive experimental tests and economic analyses.
Novel Composites for Wing and Fuselage Applications
NASA Technical Reports Server (NTRS)
Suarez, J. A.; Buttitta, C.
1996-01-01
Design development was successfully completed for textile preforms with continuous cross-stiffened epoxy panels with cut-outs. The preforms developed included 3-D angle interlock weaving of graphite structural fibers impregnated by resin film infiltration (RFI) and shown to be structurally suitable under conditions requiring minimum acquisition costs. Design guidelines/analysis methodology for such textile structures are given. The development was expanded to a fuselage side-panel component of a subsonic commercial airframe and found to be readily scalable. The successfully manufactured panel was delivered to NASA Langley for biaxial testing. This report covers the work performed under Task 3 -- Cross-Stiffened Subcomponent; Task 4 -- Design Guidelines/Analysis of Textile-Reinforced Composites; and Task 5 -- Integrally Woven Fuselage Panel.
NASA Astrophysics Data System (ADS)
Boyd, Donald M.
1989-10-01
Development of a Pulsed Electromagnetic Acoustic Transducer (EMAT) through transmission system for acoustic measurements on steel billets up to 1300 C was completed. Laboratory measurements of acoustic velocity were made, and used to determine the average internal temperature of hot stainless and carbon steel billets. Following the success of the laboratory system development, the laboratory EMAT system was subsequently tested successfully at the Baltimore Specialty Steel Co. on a horizontal continuous caster. Details of the sensor system development and the steel plant demonstration results are presented. Future directions for the high temperature pulsed EMAT internal temperature concept are discussed for potential material processing applications.
Van Dyke, James U; Griffith, Oliver W; Thompson, Michael B
2014-08-01
Mechanisms of reproductive allocation are major determinants of fitness because embryos cannot complete development without receiving sufficient nutrition from their parents. The nourishment of offspring via placentas (placentotrophy) has evolved repeatedly in vertebrates, including multiple times in squamate reptiles (lizards and snakes). Placentotrophy has been suggested to evolve only if food is sufficiently abundant throughout gestation to allow successful embryogenesis. If scarcity of food prevents successful embryogenesis, females should recoup nutrients allocated to embryos via abortion, reabsorption, and/or cannibalism. We tested these hypotheses in the placentotrophic southern grass skink Pseudemoia entrecasteauxii. We fed females one of four diets (high constant, high variable, low constant, and low variable) during gestation and tested the effects of both food amount and schedule of feeding on developmental success, cannibalism rate, placental nutrient transport, offspring size, and maternal growth and body condition. Low food availability reduced developmental success, placental nutrient transport, offspring size, and maternal growth and body condition. Cannibalism of offspring also increased when food was scarce. Schedule of feeding did not affect offspring or mothers. We suggest that high food abundance and ability to abort and cannibalize poor-quality offspring are permissive factors necessary for placentotrophy to be a viable strategy of reproductive allocation.
Triplett, Regina L; Asato, Miya R
2015-01-01
Minimal work has used psychometrically robust measures in a systematic fashion to identify and monitor children at risk for cognitive and behavioral comorbidities in current epilepsy care. We piloted a computerized cognitive battery and behavioral questionnaire for children with newly diagnosed epilepsy to determine clinical feasibility and acceptability to parents and patients. We recruited medication-naïve children (ages 8-17 years) with recent-onset seizures and typical developmental history from an outpatient child neurology clinic. Children completed the CNS Vital Signs computerized battery, whereas parents completed the Strengths and Difficulties Questionnaire. Post-test interviews with parents and patients were completed regarding the acceptability of the assessment procedures. Forty-four families were eligible, and 39 agreed to participate (89%). All assessments were completed in less than 45 minutes. Parents rated testing in clinic as convenient and important, expressing strong interest in the cognitive and behavioral impact of epilepsy and medication. Children also rated the testing procedure as acceptable and agreed that they would recommend it to peers. Our brief battery was tolerated and well received by children and their parents. Computerized testing of children along with a parent questionnaire is a psychometrically viable approach that is acceptable to families. Our protocol is time efficient for clinical use with the potential to detect early cognitive and behavioral difficulties related to epilepsy. Ongoing longitudinal study will provide further information regarding the success of our screening methods in monitoring for disease- or treatment-related changes. Copyright © 2015 Elsevier Inc. All rights reserved.
Predicting Success of Preliminary Surgical Residents: A Multi-Institutional Study.
Al Fayyadh, Mohammed J; Heller, Stephanie F; Rajab, Taufiek Konrad; Gardner, Aimee K; Bloom, Jordan P; Rawlings, Jeremy A; Mullen, John T; Smink, Douglas S; Farley, David R; Willis, Ross E; Dent, Daniel L
A nondesignated preliminary surgery (NDPS) position encompasses 1 year of training provided by many general surgery residencies. Our aim was to assess factors predicting success and provide evidence for program directors to support career guidance to preliminary residents. Retrospective cohort study of 221 NDPS residents who entered 5 university-based institutions were identified from 2009 to 2013. Records for trainees were reviewed. We defined primary success as obtaining a categorical position in the specialty of choice and secondary success as obtaining a categorical position in any specialty immediately after finishing their NDPS training. Statistical evaluation was performed using chi-square analysis, independent t-test and logistic regression using α <0.05. Of the 221 NDPS residents, 217 (98%) completed postgraduate year (PGY)-1 and 65 (29%) completed PGY-2. Totally, 90 (41%) obtained categorical general surgery positions, 89 (40%) obtained categorical positions in other specialties, and 42 (19%) failed to obtain a categorical position immediately after their NDPS years. Ultimately, 139 (63%) of residents achieved primary success and 40 (18%) additional residents obtained categorical positions in specialties other than their first choice, resulting in a total of 179 (81%) of residents obtaining categorical positions. Mean United States Medical Licensing Examination step 1 and step 2 scores for those who obtained secondary success were 227 and 234 vs. 214 and 219, respectively, for those who failed to secure a categorical position (p < 0.01). United States Medical Licensing Examination step 2 score was a significant predictor of primary (p < 0.03) and secondary success (p < 0.02). Of 65 PGY-2 NDPS residents, 32 (49%) achieved primary success, and 11 (17%) others achieved secondary success for a total of 43 (66%). For PGY-2 NDPS, American Board of Surgery In-Training Examination was the only significant predictor of primary and secondary success (p < 0.02 and p < 0.05). NDPS training provides a viable and successful opportunity for at least 81% of young physicians to pursue their career goals even after an unsuccessful first match. Copyright © 2016 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
Nano-ADEPT Aeroloads Wind Tunnel Test
NASA Technical Reports Server (NTRS)
Smith, Brandon; Cassell, A.; Yount, B.; Kruger, C.; Brivkalns, C.; Makino, A.; Zarchi, K.; McDaniel, R.; Venkatapathy, E.; Swanson, G.
2015-01-01
Analysis completed since the test suggests that all test objectives were met– This claim will be verified in the coming weeks as the data is examined further– Final disposition of test objective success will be documented in a final reportsubmitted to NASA stakeholders (early August 2015)– Expect conference paper in early 2016• Data products and observations made during testing will be used to refinecomputational models of Nano-ADEPT• Carbon fabric relaxed from its pre-test state during the test– System-level tolerance for relaxation will be driven by destination-specific andmission-specific aerothermal and aerodynamic requirements• Bonus experiment of asymmetric shape demonstrates that an asymmetricdeployable blunt body can be used to generate measureable lift– With a strut actuation system and a robust GN&C algorithm, this effect could beused to steer a blunt body at hypersonic speeds to aid precision landing
Aeroservoelastic Testing of a Sidewall Mounted Free Flying Wind-Tunnel Model
NASA Technical Reports Server (NTRS)
Scott, Robert C.; Vetter, Travis K.; Penning, Kevin B.; Coulson, David A.; Heeg, Jennifer
2008-01-01
A team comprised of the Air Force Research Laboratory (AFRL), Northrop Grumman, Lockheed Martin, and the NASA Langley Research Center conducted three j wind-tunnel tests in the Transonic Dynamics Tunnel to demonstrate active control technologies relevant to large, exible vehicles. In the rst of these three tests, a semispan, aeroelastically scaled, wind-tunnel model of a ying wing SensorCraft vehi- cle was mounted to a force balance to demonstrate gust load alleviation. In the second and third tests, the same wing was mated to a new, multi-degree-of-freedom, sidewall mount. This mount allowed the half-span model to translate vertically and pitch at the wing root, allowing better simulation of the full span vehicle's rigid-body modes. Gust Load Alleviation (GLA) and Body Freedom Flutter (BFF) suppression were successfully demonstrated. The rigid body degrees-of-freedom required that the model be own in the wind tunnel using an active control system. This risky mode of testing necessitated that a model arrestment system be integrated into the new mount. The safe and successful completion of these free-flying tests required the development and integration of custom hardware and software. This paper describes the many systems, software, and procedures that were developed as part of this effort.
Results of the 1983 NASA/JPL balloon flight solar cell calibration program
NASA Technical Reports Server (NTRS)
Downing, R. G.; Weiss, R. S.
1984-01-01
The 1983 solar cell calibration balloon flight was successfully completed and met all objectives of the program. Thirty-four modules were carried to an altitude of 36.0 kilometers. The calibrated cells can now be used as reference standards in simulator testing of cells and arrays. Cell calibration data are tabulated as well as the repeatability of standard solar cell BFS-17A (35 flights over a 21-year period).
Rodríguez-Wong, L; Pozos-Guillen, A; Silva-Herzog, D; Chavarría-Bolaños, D
2016-04-01
To compare the success of an inferior alveolar nerve block (IANB) after injecting a combination of mepivacaine and tramadol or mepivacaine alone in patients with symptomatic irreversible pulpitis (SIP) in mandibular permanent molars. This study was a double-blind, randomized, controlled clinical trial. Two study groups were selected, each consisting of 28 patients who exhibited SIP on the first or second mandibular molars. All included patients presented with moderate-to-severe preoperative pain according to the modified Heft-Parker visual analogue scale (VAS). Patients were anaesthetized using the IANB technique employing identical cartridges that contained either 1.3 mL of 2% mepivacaine with epinephrine 1 : 100 000 plus 0.5 mL of tramadol 50 mg mL(-1) (experimental group) or 1.8 mL of 2% mepivacaine with epinephrine 1 : 100 000 (control group). After 15 min, anaesthesia was evaluated by a progressive four-test examination, that is numbness of the lip, positive or negative cold test, asymptomatic management of dental hard tissues and access to dental pulp. Success of the IANB was defined as the absence of pain during any of these evaluations. The data were analysed with a chi-square, Fisher's or Mann-Whitney U test. A total of 74 patients were initially assessed, with 56 patients eventually included and 18 excluded. No significant differences in age (P = 0.384) or gender (P = 1) were found between the two groups. The success rates of anaesthesia with the IANB for the experimental and control groups were 57.1 and 46.4%, respectively. The success rate of anaesthesia in the experimental group was not significantly different (P ˃ 0.05) from that of the control group. The duration of the anaesthetic effect was significantly longer for the experimental group (P = 0.026). The combination of mepivacaine-tramadol achieved similar success rates for IANB when compared to mepivacaine 2% epinephrine 1 : 100 000. There was no significant difference in the anaesthetic efficacy between the control and experimental solutions, and none of the solutions tested were completely successful. © 2015 International Endodontic Journal. Published by John Wiley & Sons Ltd.
Status of Hollow Cathode Heater Development for the Space Station Plasma Contactor
NASA Technical Reports Server (NTRS)
Soulas, George C.
1994-01-01
A hollow cathode-based plasma contactor has been selected for use on the Space Station. During the operation of the plasma contactor, the hollow cathode heater will endure approximately 12000 thermal cycles. Since a hollow cathode heater failure would result in a plasma contactor failure, a hollow cathode heater development program was established to produce a reliable heater. The development program includes the heater design, process documents for both heater fabrication and assembly, and heater testing. The heater design was a modification of a sheathed ion thruster cathode heater. Heater tests included testing of the heater unit alone and plasma contactor and ion thruster testing. To date, eight heaters have been or are being processed through heater unit testing, two through plasma contactor testing and three through ion thruster testing, all using direct current power supplies. Comparisons of data from heater unit performance tests before cyclic testing, plasma contactor tests, and ion thruster tests at the ignition input current level show the average deviation of input power and tube temperature near the cathode tip to be +/-0.9 W and +/- 21 C, respectively. Heater unit testing included cyclic testing to evaluate reliability under thermal cycling. The first heater, although damaged during assembly, completed 5985 ignition cycles before failing. Four additional heaters successfully completed 6300, 6300, 700, and 700 cycles. Heater unit testing is currently ongoing for three heaters which have to date accumulated greater than 7250, greater than 5500, and greater than 5500 cycles, respectively.
A Case Study Examination of a Successful Community College to University Transition Partnership
ERIC Educational Resources Information Center
Phillips, Karla
2014-01-01
A low rate of successful transition and degree completion for community college (CC) students who intend to complete a baccalaureate through transfer to a four-year university has been an unresolved problem in higher education. With more students entering higher education through CCs, successful CC to university transitions have become a critical…
A Case Study of the Perceptions of teamUSA Athletes Enrolled in an Education Provider University
ERIC Educational Resources Information Center
Nugen, Robert, Sr.
2017-01-01
The problem addressed in this study is the uniquely demanding experience of contemporaneously being a successful Olympic level athlete and a successful university level student. Due to the time and energy required for successful Olympic competition, a dual-career student-athlete may complete his/her sports career without completing her/his…
JWST Pathfinder Telescope Integration
NASA Technical Reports Server (NTRS)
Matthews, Gary W.; Kennard, Scott H.; Broccolo, Ronald T.; Ellis, James M.; Daly, Elizabeth A.; Hahn, Walter G.; Amon, John N.; Mt. Pleasant, Stephen M.; Texter, Scott; Atkinson, Charles B.;
2015-01-01
The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. In 2014, a major risk reduction effort related to the Alignment, Integration, and Test (AI&T) of the segmented telescope was completed. The Pathfinder telescope includes two Primary Mirror Segment Assemblies (PMSA's) and the Secondary Mirror Assembly (SMA) onto a flight-like composite telescope backplane. This pathfinder allowed the JWST team to assess the alignment process and to better understand the various error sources that need to be accommodated in the flight build. The successful completion of the Pathfinder Telescope provides a final integration roadmap for the flight operations that will start in August 2015.
Nagori, Shakil Ahmed; Jose, Anson; Bhutia, Ongkila; Roychoudhury, Ajoy
2014-11-01
To evaluate the success of autogenous transplantation of embedded/impacted third molars harvested using piezosurgery. This prospective pilot study enrolled 20 healthy patients with non-restorable first/second molars and a caries-free retrievable embedded/impacted third molar. Piezosurgery was used for removing inter-radicular bone at the recipient socket as well as for bone removal around the donor teeth. After an average follow-up of 16.4 months (SD = 1.9), 18 cases were successful with formation of periodontal ligament around the teeth. One tooth was lost due to infection at 1 month. One patient was lost to follow-up. There was no root resorption or ankylosis in any of the cases. In six donor teeth with complete root formation, root canal treatment was carried out. All the remaining teeth responded positively with vitality testing. Piezosurgery is an effective device if embedded/impacted third molars are to be harvested for successful autogenous transplantation.
Boonen, Anton J. H.; de Koning, Björn B.; Jolles, Jelle; van der Schoot, Menno
2016-01-01
Successfully solving mathematical word problems requires both mental representation skills and reading comprehension skills. In Realistic Math Education (RME), however, students primarily learn to apply the first of these skills (i.e., representational skills) in the context of word problem solving. Given this, it seems legitimate to assume that students from a RME curriculum experience difficulties when asked to solve semantically complex word problems. We investigated this assumption under 80 sixth grade students who were classified as successful and less successful word problem solvers based on a standardized mathematics test. To this end, students completed word problems that ask for both mental representation skills and reading comprehension skills. The results showed that even successful word problem solvers had a low performance on semantically complex word problems, despite adequate performance on semantically less complex word problems. Based on this study, we concluded that reading comprehension skills should be given a (more) prominent role during word problem solving instruction in RME. PMID:26925012
Boonen, Anton J H; de Koning, Björn B; Jolles, Jelle; van der Schoot, Menno
2016-01-01
Successfully solving mathematical word problems requires both mental representation skills and reading comprehension skills. In Realistic Math Education (RME), however, students primarily learn to apply the first of these skills (i.e., representational skills) in the context of word problem solving. Given this, it seems legitimate to assume that students from a RME curriculum experience difficulties when asked to solve semantically complex word problems. We investigated this assumption under 80 sixth grade students who were classified as successful and less successful word problem solvers based on a standardized mathematics test. To this end, students completed word problems that ask for both mental representation skills and reading comprehension skills. The results showed that even successful word problem solvers had a low performance on semantically complex word problems, despite adequate performance on semantically less complex word problems. Based on this study, we concluded that reading comprehension skills should be given a (more) prominent role during word problem solving instruction in RME.
Loss to Follow-Up from HIV Screening to ART Initiation in Rural China.
Gu, Diane; Mao, Yurong; Tang, Zhenzhu; Montaner, Julio; Shen, Zhiyong; Zhu, Qiuying; Detels, Roger; Jin, Xia; Xiong, Ran; Xu, Juan; Ling, Walter; Erinoff, Lynda; Lindblad, Robert; Liu, David; Van Veldhuisen, Paul; Hasson, Albert; Wu, Zunyou
2016-01-01
Patients who are newly screened HIV positive by EIA are lost to follow-up due to complicated HIV testing procedures. Because this is the first step in care, it affects the entire continuum of care. This is a particular concern in rural China. To assess the routine HIV testing completeness and treatment initiation rates at 18 county-level general hospitals in rural Guangxi. We reviewed original hospital HIV screening records. Investigators also engaged with hospital leaders and key personnel involved in HIV prevention activities to characterize in detail the routine care practices in place at each county. 699 newly screened HIV-positive patients between January 1 and June 30, 2013 across the 18 hospitals were included in the study. The proportion of confirmatory testing across the 18 hospitals ranged from 14% to 87% (mean of 43%), and the proportion of newly diagnosed individuals successfully initiated antiretroviral treatment across the hospitals ranged from 3% to 67% (mean of 23%). The average interval within hospitals for individuals to receive the Western Blot (WB) and CD4 test results from HIV positive screening (i.e. achieving testing completion) ranged from 14-116 days (mean of 41.7 days) across the hospitals. The shortest interval from receiving a positive EIA screening test result to receiving WB and CD4 testing and counseling was 0 day and the longest was 260 days. The proportion of patients newly screened HIV positive that completed the necessary testing procedures for HIV confirmation and received ART was very low. Interventions are urgently needed to remove barriers so that HIV patients can have timely access to HIV/AIDS treatment and care in rural China.
Loss to Follow-Up from HIV Screening to ART Initiation in Rural China
Gu, Diane; Mao, Yurong; Tang, Zhenzhu; Montaner, Julio; Shen, Zhiyong; Zhu, Qiuying; Detels, Roger; Jin, Xia; Xiong, Ran; Xu, Juan; Ling, Walter; Erinoff, Lynda; Lindblad, Robert; Liu, David; Van Veldhuisen, Paul; Hasson, Albert; Wu, Zunyou
2016-01-01
Background Patients who are newly screened HIV positive by EIA are lost to follow-up due to complicated HIV testing procedures. Because this is the first step in care, it affects the entire continuum of care. This is a particular concern in rural China. Objective(s) To assess the routine HIV testing completeness and treatment initiation rates at 18 county-level general hospitals in rural Guangxi. Methods We reviewed original hospital HIV screening records. Investigators also engaged with hospital leaders and key personnel involved in HIV prevention activities to characterize in detail the routine care practices in place at each county. Results 699 newly screened HIV-positive patients between January 1 and June 30, 2013 across the 18 hospitals were included in the study. The proportion of confirmatory testing across the 18 hospitals ranged from 14% to 87% (mean of 43%), and the proportion of newly diagnosed individuals successfully initiated antiretroviral treatment across the hospitals ranged from 3% to 67% (mean of 23%). The average interval within hospitals for individuals to receive the Western Blot (WB) and CD4 test results from HIV positive screening (i.e. achieving testing completion) ranged from 14–116 days (mean of 41.7 days) across the hospitals. The shortest interval from receiving a positive EIA screening test result to receiving WB and CD4 testing and counseling was 0 day and the longest was 260 days. Conclusion The proportion of patients newly screened HIV positive that completed the necessary testing procedures for HIV confirmation and received ART was very low. Interventions are urgently needed to remove barriers so that HIV patients can have timely access to HIV/AIDS treatment and care in rural China. PMID:27768710
Venneman, Sandy; Leuchter, Andrew; Bartzokis, George; Beckson, Mace; Simon, Sara L; Schaefer, Melodie; Rawson, Richard; Newton, Tom; Cook, Ian A; Uijtdehaage, Sebastian; Ling, Walter
2006-01-01
Cocaine treatment trials suffer from a high rate of attrition. We examined pretreatment neurophysiological factors to identify participants at greatest risk. Twenty-five participants were divided into concordant and discordant groups following electroencephalogram (EEG) measures recorded prior to a double-blind, placebo-controlled treatment trial. Three possible outcomes were examined: successful completion, dropout, and removal. Concordant (high perfusion correlate) participants had an 85% rate of successful completion, while discordant participants had a 15% rate of successful completion. Twenty-five percent of dropouts and 50% of participants removed were discordant (low perfusion correlate), while only 25% of those who completed were discordant. Failure to complete the trial was not explained by depression, craving, benzoylecgonine levels or quantitative electroencephalogram (QEEG) power; thus cordance may help identify attrition risk.
ERIC Educational Resources Information Center
Vander Hooven, James L.
2009-01-01
This study presents the experiences of success of 11 women who have completed an associate degree while parenting children. Women parenting children are a population at especially high risk of non-completion. In much of the research, however, women parenting children are only mentioned peripherally as a subpopulation of nontraditional students;…
ERIC Educational Resources Information Center
Kirk, Richard; Watt, Karen M.
2018-01-01
This qualitative study examines how Mexican American students participating in an AVID for Higher Education course perceived their preparation for the workforce and efficacy of completing a college credential. A focus group approach was used to explore how social and cultural networks (networks for success) contribute to college completion. The…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abe Lederman
This report contains the comprehensive summary of the work performed on the SBIR Phase II project (“Distributed Relevance Ranking in Heterogeneous Document Collections”) at Deep Web Technologies (http://www.deepwebtech.com). We have successfully completed all of the tasks defined in our SBIR Proposal work plan (See Table 1 - Phase II Tasks Status). The project was completed on schedule and we have successfully deployed an initial production release of the software architecture at DOE-OSTI for the Science.gov Alliance's search portal (http://www.science.gov). We have implemented a set of grid services that supports the extraction, filtering, aggregation, and presentation of search results from numerousmore » heterogeneous document collections. Illustration 3 depicts the services required to perform QuickRank™ filtering of content as defined in our architecture documentation. Functionality that has been implemented is indicated by the services highlighted in green. We have successfully tested our implementation in a multi-node grid deployment both within the Deep Web Technologies offices, and in a heterogeneous geographically distributed grid environment. We have performed a series of load tests in which we successfully simulated 100 concurrent users submitting search requests to the system. This testing was performed on deployments of one, two, and three node grids with services distributed in a number of different configurations. The preliminary results from these tests indicate that our architecture will scale well across multi-node grid deployments, but more work will be needed, beyond the scope of this project, to perform testing and experimentation to determine scalability and resiliency requirements. We are pleased to report that a production quality version (1.4) of the science.gov Alliance's search portal based on our grid architecture was released in June of 2006. This demonstration portal is currently available at http://science.gov/search30 . The portal allows the user to select from a number of collections grouped by category and enter a query expression (See Illustration 1 - Science.gov 3.0 Search Page). After the user clicks “search” a results page is displayed that provides a list of results from the selected collections ordered by relevance based on the query expression the user provided. Our grid based solution to deep web search and document ranking has already gained attention within DOE, other Government Agencies and a fortune 50 company. We are committed to the continued development of grid based solutions to large scale data access, filtering, and presentation problems within the domain of Information Retrieval and the more general categories of content management, data mining and data analysis.« less
Neural correlates of encoding processes predicting subsequent cued recall and source memory.
Angel, Lucie; Isingrini, Michel; Bouazzaoui, Badiâa; Fay, Séverine
2013-03-06
In this experiment, event-related potentials were used to examine whether the neural correlates of encoding processes predicting subsequent successful recall differed from those predicting successful source memory retrieval. During encoding, participants studied lists of words and were instructed to memorize each word and the list in which it occurred. At test, they had to complete stems (the first four letters) with a studied word and then make a judgment of the initial temporal context (i.e. list). Event-related potentials recorded during encoding were segregated according to subsequent memory performance to examine subsequent memory effects (SMEs) reflecting successful cued recall (cued recall SME) and successful source retrieval (source memory SME). Data showed a cued recall SME on parietal electrode sites from 400 to 1200 ms and a late inversed cued recall SME on frontal sites in the 1200-1400 ms period. Moreover, a source memory SME was reported from 400 to 1400 ms on frontal areas. These findings indicate that patterns of encoding-related activity predicting successful recall and source memory are clearly dissociated.
Hayama, Hiroki R.; Vilberg, Kaia L.
2012-01-01
Recall of a studied item and retrieval of its encoding context (source memory) both depend upon recollection of qualitative information about the study episode. The present study investigated whether recall and source memory engage overlapping neural regions. Subjects (N=18) studied a series of words which were presented either to the left or right of fixation. fMRI data were collected during a subsequent test phase in which three-letter word stems were presented, two-thirds of which could be completed by a study item. Instructions were to use each stem as a cue to recall a studied word and, when recall was successful, to indicate the word’s study location. When recall failed, the stem was to be completed with the first word to come to mind. Relative to stems for which recall failed, word stems eliciting successful recall were associated with enhanced activity in a variety of cortical regions, including bilateral parietal, posterior midline, and parahippocampal cortex. Activity in these regions was enhanced when recall was accompanied by successful rather than unsuccessful source retrieval. It is proposed that the regions form part of a ‘recollection network’ in which activity is graded according to the amount of information retrieved about a study episode. PMID:22288393
Hayama, Hiroki R; Vilberg, Kaia L; Rugg, Michael D
2012-05-01
Recall of a studied item and retrieval of its encoding context (source memory) both depend on recollection of qualitative information about the study episode. This study investigated whether recall and source memory engage overlapping neural regions. Participants (n = 18) studied a series of words, which were presented either to the left or right of fixation. fMRI data were collected during a subsequent test phase in which three-letter word-stems were presented, two thirds of which could be completed by a study item. Instructions were to use each stem as a cue to recall a studied word and, when recall was successful, to indicate the word's study location. When recall failed, the stem was to be completed with the first word to come to mind. Relative to stems for which recall failed, word-stems eliciting successful recall were associated with enhanced activity in a variety of cortical regions, including bilateral parietal, posterior midline, and parahippocampal cortex. Activity in these regions was enhanced when recall was accompanied by successful rather than unsuccessful source retrieval. It is proposed that the regions form part of a "recollection network" in which activity is graded according to the amount of information retrieved about a study episode.
Biomass power for rural development: Phase 2. Technical progress report, April 1--June 30, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
1998-11-01
The project undertaken by the Salix Consortium is a multi-phased, multi-partner endeavor. Phase-1 focused on initial development and testing of the technology and agreements necessary to demonstrate commercial willow production in Phase-2. The Phase-1 objectives have been successfully completed: preparing final design plans for two utility pulverized coal boilers, developing fuel supply plans for the project, obtaining power production commitments from the power companies for Phase-2, obtaining construction and environmental permits, and developing an experimental strategy for crop production and power generation improvements needed to assure commercial success. The R and D effort also addresses environmental issues pertaining to introductionmore » of the willow energy system. Beyond those Phase-1 requirements the Consortium has already successfully demonstrated cofiring at Greenidge Station and developed the required nursery capacity for acreage scale-up. This past summer 105 acres were prepared in advance for the spring planting in 1998. Having completed the above tasks, the Consortium is well positioned to begin Phase-2. In phase-2 every aspect of willow production and power generation from willow will be demonstrated. The ultimate objective of Phase-2 is to transition the work performed under the Rural Energy for the Future project into a thriving, self-supported energy crop enterprise.« less
Splenectomy reduces packed red cell transfusion requirement in children with sickle cell disease.
Haricharan, Ramanath N; Roberts, Jared M; Morgan, Traci L; Aprahamian, Charles J; Hardin, William D; Hilliard, Lee M; Georgeson, Keith E; Barnhart, Douglas C
2008-06-01
The purpose of the study was to measure the effect of splenectomy on packed-cell transfusion requirement in children with sickle cell disease. Thirty-seven sickle cell children who underwent splenectomies between January 2000 and May 2006 at a children's hospital were reviewed. Data were collected 6 months preoperatively to 12 months postsplenectomy. Paired t test, analysis of variance, and multivariable regression analyses were performed. Of 37 children with median age 11 years (range, 2-18 years), 34 (21 males) had data that allowed analyses. Twenty-six had Hgb-SS, 5 had Hgb-SC, and 3 had Hgb S-Thal. Laparoscopic splenectomy was attempted in 36 and completed successfully in 34 (94% success). The number of units transfused decreased by 38% for 0 to 6 months and by 45% for 6 to 12 months postsplenectomy. Postoperatively, hematocrit levels increased and reticulocytes concurrently decreased with a reduction in transfusion clinic visits. The decrease in transfusion was not influenced by spleen weight, age, or hemoglobin type. Two children had acute chest syndrome (6%), and 1 had severe pneumonia (3%). Laparoscopic splenectomy can be successfully completed in sickle cell children. Splenectomy significantly reduces the packed red cell transfusion requirement and frequency of clinic visits, in sickle cell children for at least 12 months postoperatively.
Allison, Katelyn Fleishman; Keenan, Karen A; Wohleber, Meleesa F; Perlsweig, Katherine A; Pletcher, Erin R; Lovalekar, Mita; Beals, Kim; Coleman, Lawrence C; Nindl, Bradley C
2017-11-01
Women can serve in all military occupational specialties (MOS); however, musculoskeletal and physiological characteristics that predict successful completion of ground combat MOS schools by female Marines are unknown. To determine which demographic, musculoskeletal, and physiological characteristics predict graduation from infantry and vehicle ground combat MOS schools in female Marines. Prospective cohort study. Prior to MOS school, the following were assessed in 62 female Marines (22.0±3.0yrs, 163.9±5.8cm, 63.4±7.2kg): isokinetic shoulder, trunk, and knee and isometric ankle strength; body composition; anaerobic power (AP)/capacity (AC); maximal oxygen uptake (VO 2 max); and field-based fitness tests (broad jump, medicine ball throw, pro-agility). Both absolute and normalized (%body mass: %BM) values were utilized for strength, AP, AC, and VO 2 max. Select tests from each Marine's most recent Physical Fitness Test (PFT: abdominal crunches, 3-mile run time) and Combat Fitness Test (CFT: Maneuver Under Fire, Movement to Contact) were recorded. Participants were classified as graduated (N=46) or did not graduate (N=16). Simple logistic regression was performed to determine predictors of MOS school graduation. Statistical significance was set a priori at α=0.05. Absolute and normalized ankle inversion and eversion strength, normalized anaerobic capacity, absolute and normalized VO 2 max, right pro-agility, and PFT 3-mile run time significantly predicted MOS school graduation (p<0.05). Greater ankle strength, better agility, and greater anaerobic and aerobic capacity are important for successful completion of ground combat MOS school in female Marines. Prior to entering ground combat MOS school, it is recommended that female Marines should train to optimize these mobility-centric characteristics. Copyright © 2017 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.
Vibration Test of a SNAP-8 Sodium-Potassium Alloy Pump
1970-01-21
Aeronautics and Space Administration (NASA) Lewis Research Center. Aerojet General was contracted to design the SNAP-8 generator which employed a mercury Rankine system to convert the reactor’s heat into electrical power. The hermetically-sealed pump was designed to generate from 35 to 90 kilowatts of electrical power. In 1964 a SNAP-8 test rig with a mercury boiler and condenser was set up in cell W-1 of Lewis’ Engine Research Building to study the transients in the system’s three loops. In 1967 a complete Rankine system was operated for 60 days in W-1 to verify the integrity of the Lewis-developed mercury boiler. Further tests in 1969 verified the shutdown and startup of the system under normal and emergency conditions. Aerojet operated the first full-Rankine system in June 1966 and completed a 2500-hour endurance test in early 1969. Lewis and Aerojet’s success on the Rankine system was acknowledged with NASA Group Achievement Award in November 1970. The 1970 vibration tests, seen here, were conducted in Lewis’ Engine Research Building’s environmental laboratory. The testing replicated the shock and vibration expected to occur during the launch into space and subsequent maneuvering. The pump was analyzed on each of its major axes.
NASA X-Ray Observatory Completes Tests Under Harsh Simulated Space Conditions
NASA Astrophysics Data System (ADS)
1998-07-01
NASA's most powerful X-ray observatory has successfully completed a month-long series of tests in the extreme heat, cold, and airless conditions it will encounter in space during its five-year mission to shed new light on some of the darkest mysteries of the universe. The Advanced X-ray Astrophysics Facility was put through the rigorous testing as it was alternately heated and cooled in a special vacuum chamber at TRW Space and Electronics Group in Redondo Beach, Calif., NASA's prime contractor for the observatory. "Successful completion of thermal vacuum testing marks a significant step in readying the observatory for launch aboard the Space Shuttle in January," said Fred Wojtalik, manager of the Observatory Projects Office at NASA's Marshall Space Flight Center in Huntsville, Ala. "The observatory is a complex, highly sophisticated, precision instrument," explained Wojtalik. "We are pleased with the outcome of the testing, and are very proud of the tremendous team of NASA and contractor technicians, engineers and scientists that came together and worked hard to meet this challenging task." Testing began in May after the observatory was raised into the 60-foot thermal vacuum chamber at TRW. Testing was completed on June 20. During the tests the Advanced X-ray Astrophysics Facility was exposed to 232 degree heat and 195 degree below zero Fahrenheit cold. During four temperature cycles, all elements of the observatory - the spacecraft, telescope, and science instruments - were checked out. Computer commands directing the observatory to perform certain functions were sent from test consoles at TRW to all Advanced X-ray Astrophysics Facility components. A team of contractor and NASA engineers and scientists monitored and evaluated the results. Commands were also sent from, and test data monitored at, the Advanced X-ray Astrophysics Facility Operations Control Center in Cambridge, Mass., as part of the test series. The observatory will be managed and controlled from the Operations Control Center after launch. "As is usually the case, we identified a few issues to be resolved before launch," said Wojtalik. "Overall, however, the observatory performed exceptionally well." The observatory test team discovered a mechanical problem with one of the primary science instruments, the Imaging Spectrometer. A door protecting the instrument did not function when commanded by test controllers. "We do these tests to check and double check every aspect of satellite operation that could affect the ultimate success of the science mission," said Craig Staresinich, TRW Advanced X-ray Astrophysics Facility program manager. "Discovering a problem now is a success. Discovering a problem later, after launch, would be a failure." A team of NASA and contractor engineers are studying the mechanical problem and developing a plan to correct it. The instrument will be sent back to its builder, Lockheed-Martin Astronautics in Denver, Colo., where it will be repaired while the rest of the observatory continues other testing. This should still allow an on-time delivery of the observatory to NASA's Kennedy Space Center, Fla., in August, where it will be readied for launch in January. With a resolving power 10 times greater than previous X-ray telescopes, the new X-ray observatory will provide scientists with views of previously invisible X-ray sources, including black holes, exploding stars and interstellar gasses. The third of NASA's Great Observatories, it will join the Compton Gamma Ray Observatory and the Hubble Space Telescope in orbit. The Advanced X-ray Astrophysics Facility program is managed by the Marshall Center for the Office of Space Science, NASA Headquarters, Washington, D.C. TRW Space & Electronics Group is assembling the observatory and doing verification testing. The Advanced X-ray Astrophysics Facility Operations Control Center is operated by the Smithsonian Astrophysical Observatory. Using glass purchased from Schott Glaswerke, Mainz, Germany, the telescope's mirrors were built by Raytheon Optical Systems Inc., Danbury, Conn. The mirrors were coated by Optical Coating Laboratory, Inc., Santa Rosa, Calif., and assembled by EastmanKodak Co., Rochester, N.Y. The Advanced X-ray Astrophysics Facility Charge-Coupled Device Imaging Spectrometer was developed by Pennsylvania State University, University Park, Pa., and the Massachusetts Institute of Technology (MIT), Cambridge. One diffraction grating was developed by MIT, the other by the Space Research Organization Netherlands, Utrecht, Netherlands, in collaboration with the Max Planck Institute, Garching, Germany. The High Resolution Camera was built by the Smithsonian Astrophysical Observatory. Ball Aerospace & Technologies Corporation of Boulder, Colo., developed the aspect camera and the Science Instrument Module. Note to editors: Digital images to accompany this release are available via the World Wide Web at the following URL: http://chandra.harvard.edu/press/images.html
Voyager spacecraft electrostatic discharge testing
NASA Technical Reports Server (NTRS)
Whittlesey, A.; Inouye, G.
1980-01-01
The program of environmental testing undergone by the Voyager spacecraft in order to simulate the transient voltage effects of electrostatic discharges expected in the energetic plasma environment of Jupiter is reported. The testing consists of studies of the electrostatic discharge characteristics of spacecraft dielectrics in a vacuum-chamber-electron beam facility, brief piece part sensitivity tests on such items as a MOSFET multiplexer and the grounding of the thermal blanket, and assembly tests of the magnetometer boom and the science boom. In addition, testing of a complete spacecraft was performed using two arc sources to simulate long and short duration discharge sources for successive spacecraft shielding and grounding improvements. Due to the testing program, both Voyager 1 and Voyager 2 experienced tolerable electrostatic discharge-caused transient anomalies in science and engineering subsystems, however, a closer duplication of the spacecraft environment is necessary to predict and design actual spacecraft responses more accurately.
Thermal Testing of Ablators in the NASA Johnson Space Center Radiant Heat Test Facility
NASA Technical Reports Server (NTRS)
Del Papa, Steven; Milhoan, Jim; Remark, Brian; Suess, Leonard
2016-01-01
A spacecraft's thermal protection system (TPS) is required to survive the harsh environment experienced during reentry. Accurate thermal modeling of the TPS is required to since uncertainties in the thermal response result in higher design margins and an increase in mass. The Radiant Heat Test Facility (RHTF) located at the NASA Johnson Space Center (JSC) replicates the reentry temperatures and pressures on system level full scale TPS test models for the validation of thermal math models. Reusable TPS, i.e. tile or reinforced carbon-carbon (RCC), have been the primary materials tested in the past. However, current capsule designs for MPCV and commercial programs have required the use of an ablator TPS. The RHTF has successfully completed a pathfinder program on avcoat ablator material to demonstrate the feasibility of ablator testing. The test results and corresponding ablation analysis results are presented in this paper.
NASA Technical Reports Server (NTRS)
Zachary, A. T.; Csomor, A.; Tignac, L. L.
1973-01-01
Small, high-performance LO2 and LH2 turbopump assembly configurations were selected, detail designs were prepared and two of each unit were fabricated with each unit consisting of pump, turbine gas generator, and appropriate controls. Following fabrication, development testing was conducted on each type to demonstrate performance, durability, transient characteristics, and heat transfer under simulated altitude conditions. Following successful completion of development effort, the two LO2 turbopump units and one LH2 turbopump unit were acceptance tested as specified. Inspection of the units following development testing revealed no deleterious effects of testing. The test results of LO2 turbopump assembly testing correlated well with predicted performance while the LH2 turbopump test results, though generally consistent with predicted values, did show lower than anticipated developed head at the design point and in the high flow range of operation.