  1. Optics Supply Planning System

    SciTech Connect

    Gaylord, J

    2009-04-30

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  2. Rhode Island Water Supply System Management Plan Database (WSSMP-Version 1.0)

    USGS Publications Warehouse

    Granato, Gregory E.

    2004-01-01

    In Rhode Island, the availability of water of sufficient quality and quantity to meet current and future environmental and economic needs is vital to life and the State's economy. Water suppliers, the Rhode Island Water Resources Board (RIWRB), and other State agencies responsible for water resources in Rhode Island need information about available resources, the water-supply infrastructure, and water use patterns. These decision makers need historical, current, and future water-resource information. In 1997, the State of Rhode Island formalized a system of Water Supply System Management Plans (WSSMPs) to characterize and document relevant water-supply information. All major water suppliers (those that obtain, transport, purchase, or sell more than 50 million gallons of water per year) are required to prepare, maintain, and carry out WSSMPs. An electronic database for this WSSMP information has been deemed necessary by the RIWRB for water suppliers and State agencies to consistently document, maintain, and interpret the information in these plans. Availability of WSSMP data in standard formats will allow water suppliers and State agencies to improve the understanding of water-supply systems and to plan for future needs or water-supply emergencies. In 2002, however, the Rhode Island General Assembly passed a law that classifies some of the WSSMP information as confidential to protect the water-supply infrastructure from potential terrorist threats. Therefore the WSSMP database was designed for an implementation method that will balance security concerns with the information needs of the RIWRB, suppliers, other State agencies, and the public. A WSSMP database was developed by the U.S. Geological Survey in cooperation with the RIWRB. The database was designed to catalog WSSMP information in a format that would accommodate synthesis of current and future information about Rhode Island's water-supply infrastructure. This report documents the design and implementation of

  3. Reformulation linearization technique based branch-and-reduce approach applied to regional water supply system planning

    NASA Astrophysics Data System (ADS)

    Lan, Fujun; Bayraksan, Güzin; Lansey, Kevin

    2016-03-01

    A regional water supply system design problem that determines pipe and pump design parameters and water flows over a multi-year planning horizon is considered. A non-convex nonlinear model is formulated and solved by a branch-and-reduce global optimization approach. The lower bounding problem is constructed via a three-pronged effort that involves transforming the space of certain decision variables, polyhedral outer approximations, and the Reformulation Linearization Technique (RLT). Range reduction techniques are employed systematically to speed up convergence. Computational results demonstrate the efficiency of the proposed algorithm; in particular, the critical role range reduction techniques could play in RLT based branch-and-bound methods. Results also indicate using reclaimed water not only saves freshwater sources but is also a cost-effective non-potable water source in arid regions. Supplemental data for this article can be accessed at http://dx.doi.org/10.1080/0305215X.2015.1016508.

  4. Optimal planning and design of a renewable energy based supply system for microgrids

    DOE PAGESBeta

    Hafez, Omar; Bhattacharya, Kankar

    2012-03-03

    This paper presents a technique for optimal planning and design of hybrid renewable energy systems for microgrid applications. The Distributed Energy Resources Customer Adoption Model (DER-CAM) is used to determine the optimal size and type of distributed energy resources (DERs) and their operating schedules for a sample utility distribution system. Using the DER-CAM results, an evaluation is performed to evaluate the electrical performance of the distribution circuit if the DERs selected by the DER-CAM optimization analyses are incorporated. Results of analyses regarding the economic benefits of utilizing the optimal locations identified for the selected DER within the system are alsomore » presented. The actual Brookhaven National Laboratory (BNL) campus electrical network is used as an example to show the effectiveness of this approach. The results show that these technical and economic analyses of hybrid renewable energy systems are essential for the efficient utilization of renewable energy resources for microgird applications.« less

  5. Optimal planning and design of a renewable energy based supply system for microgrids

    SciTech Connect

    Hafez, Omar; Bhattacharya, Kankar

    2012-03-03

    This paper presents a technique for optimal planning and design of hybrid renewable energy systems for microgrid applications. The Distributed Energy Resources Customer Adoption Model (DER-CAM) is used to determine the optimal size and type of distributed energy resources (DERs) and their operating schedules for a sample utility distribution system. Using the DER-CAM results, an evaluation is performed to evaluate the electrical performance of the distribution circuit if the DERs selected by the DER-CAM optimization analyses are incorporated. Results of analyses regarding the economic benefits of utilizing the optimal locations identified for the selected DER within the system are also presented. The actual Brookhaven National Laboratory (BNL) campus electrical network is used as an example to show the effectiveness of this approach. The results show that these technical and economic analyses of hybrid renewable energy systems are essential for the efficient utilization of renewable energy resources for microgird applications.

  6. Spatio-temporal modelling of electrical supply systems to optimize the site planning process for the "power to mobility" technology

    NASA Astrophysics Data System (ADS)

    Karl, Florian; Zink, Roland

    2016-04-01

    The transformation of the energy sector towards decentralized renewable energies (RE) requires also storage systems to ensure security of supply. The new "Power to Mobility" (PtM) technology is one potential solution to use electrical overproduction to produce methane for i.e. gas vehicles. Motivated by these fact, the paper presents a methodology for a GIS-based temporal modelling of the power grid, to optimize the site planning process for the new PtM-technology. The modelling approach is based on a combination of the software QuantumGIS for the geographical and topological energy supply structure and OpenDSS for the net modelling. For a case study (work in progress) of the city of Straubing (Lower Bavaria) the parameters of the model are quantified. The presentation will discuss the methodology as well as the first results with a view to the application on a regional scale.

  7. The Anaesthesia Gas Supply System

    PubMed Central

    Das, Sabyasachi; Chattopadhyay, Subhrajyoti; Bose, Payel

    2013-01-01

    The anaesthesia gas supply system is designed to provide a safe, cost-effective and convenient system for the delivery of medical gases at the point of-use. The doctrine of the anaesthesia gas supply system is based on four essential principles: Identity, continuity, adequacy and quality. Knowledge about gas supply system is an integral component of safe anaesthetic practice. Mishaps involving the malfunction or misuse of medical gas supply to operating theatres have cost many lives. The medical gases used in anaesthesia and intensive care are oxygen, nitrous oxide, medical air, entonox, carbon dioxide and heliox. Oxygen is one of the most widely used gases for life-support and respiratory therapy besides anaesthetic procedures. In this article, an effort is made to describe the production, storage and delivery of anaesthetic gases. The design of anaesthesia equipment must take into account the local conditions such as climate, demand and power supply. The operational policy of the gas supply system should have a backup plan to cater to the emergency need of the hospital, in the event of the loss of the primary source of supply. PMID:24249882

  8. Proton driver power supply system

    SciTech Connect

    C. Jach and D. Wolff

    2002-06-03

    This paper describes magnet power supply system for a proposed Proton Driver at Fermilab. The magnet power supply system consists of resonant dipole/quadrupole power supply system, quadrupole tracking, dipole correction (horizontal and vertical) and sextupole power supply systems. This paper also describes preliminary design of the power distribution system supplying 13.8 kV power to all proton Driver electrical systems.

  9. Water Supply Infrastructure System Surety

    SciTech Connect

    EKMAN,MARK E.; ISBELL,DARYL

    2000-01-06

    The executive branch of the United States government has acknowledged and identified threats to the water supply infrastructure of the United States. These threats include contamination of the water supply, aging infrastructure components, and malicious attack. Government recognition of the importance of providing safe, secure, and reliable water supplies has a historical precedence in the water works of the ancient Romans, who recognized the same basic threats to their water supply infrastructure the United States acknowledges today. System surety is the philosophy of ''designing for threats, planning for failure, and managing for success'' in system design and implementation. System surety is an alternative to traditional compliance-based approaches to safety, security, and reliability. Four types of surety are recognized: reactive surety; proactive surety, preventative surety; and fundamental, inherent surety. The five steps of the system surety approach can be used to establish the type of surety needed for the water infrastructure and the methods used to realize a sure water infrastructure. The benefit to the water industry of using the system surety approach to infrastructure design and assessment is a proactive approach to safety, security, and reliability for water transmission, treatment, distribution, and wastewater collection and treatment.

  10. Finance and supply management project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  11. Feedstock Supply System Logistics

    SciTech Connect

    2006-06-01

    Feedstock supply is a significant cost component in the production of biobased fuels, products, and power. The uncertainty of the biomass feedstock supply chain and associated risks are major barriers to procuring capital funding for start-up biorefineries.

  12. On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance.

    PubMed

    Chiu, Singa Wang; Huang, Chao-Chih; Chiang, Kuo-Wei; Wu, Mei-Fang

    2015-01-01

    Transnational companies, operating in extremely competitive global markets, always seek to lower different operating costs, such as inventory holding costs in their intra- supply chain system. This paper incorporates a cost reducing product distribution policy into an intra-supply chain system with multiple sales locations and quality assurance studied by [Chiu et al., Expert Syst Appl, 40:2669-2676, (2013)]. Under the proposed cost reducing distribution policy, an added initial delivery of end items is distributed to multiple sales locations to meet their demand during the production unit's uptime and rework time. After rework when the remaining production lot goes through quality assurance, n fixed quantity installments of finished items are then transported to sales locations at a fixed time interval. Mathematical modeling and optimization techniques are used to derive closed-form optimal operating policies for the proposed system. Furthermore, the study demonstrates significant savings in stock holding costs for both the production unit and sales locations. Alternative of outsourcing product delivery task to an external distributor is analyzed to assist managerial decision making in potential outsourcing issues in order to facilitate further reduction in operating costs. PMID:26576330

  13. On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance.

    PubMed

    Chiu, Singa Wang; Huang, Chao-Chih; Chiang, Kuo-Wei; Wu, Mei-Fang

    2015-01-01

    Transnational companies, operating in extremely competitive global markets, always seek to lower different operating costs, such as inventory holding costs in their intra- supply chain system. This paper incorporates a cost reducing product distribution policy into an intra-supply chain system with multiple sales locations and quality assurance studied by [Chiu et al., Expert Syst Appl, 40:2669-2676, (2013)]. Under the proposed cost reducing distribution policy, an added initial delivery of end items is distributed to multiple sales locations to meet their demand during the production unit's uptime and rework time. After rework when the remaining production lot goes through quality assurance, n fixed quantity installments of finished items are then transported to sales locations at a fixed time interval. Mathematical modeling and optimization techniques are used to derive closed-form optimal operating policies for the proposed system. Furthermore, the study demonstrates significant savings in stock holding costs for both the production unit and sales locations. Alternative of outsourcing product delivery task to an external distributor is analyzed to assist managerial decision making in potential outsourcing issues in order to facilitate further reduction in operating costs.

  14. Sustainable Biomass Supply Systems

    SciTech Connect

    Erin Searcy; Dave Muth; Erin Wilkerson; Shahab Sokansanj; Bryan Jenkins; Peter Titman; Nathan Parker; Quinn Hart; Richard Nelson

    2009-04-01

    The U.S. Department of Energy (DOE) aims to displace 30% of the 2004 gasoline use (60 billion gal/yr) with biofuels by 2030 as outlined in the Energy Independence and Security Act of 2007, which will require 700 million tons of biomass to be sustainably delivered to biorefineries annually. Lignocellulosic biomass will make an important contribution towards meeting DOE’s ethanol production goals. For the biofuels industry to be an economically viable enterprise, the feedstock supply system (i.e., moving the biomass from the field to the refinery) cannot contribute more that 30% of the total cost of the biofuel production. The Idaho National Laboratory in collaboration with Oak Ridge National Laboratory, University of California, Davis and Kansas State University are developing a set of tools for identifying economical, sustainable feedstocks on a regional basis based on biorefinery siting.

  15. Intelligent decision support tool for supply chain planning

    NASA Astrophysics Data System (ADS)

    Li, Dong; Barnes, Cathy; Axtell, C.; McKay, Alison; de Pennington, Alan

    2001-10-01

    A decision support system using extended quality function deployment model (EQFDM) and internet application for manufacturing supply chain (SC) planning has been developed in this research. In this paper, a customer-focused quality evaluation approach, the EQFDM with internet application is employed to develop a coordinated planning system in SCs and assist mapping decisions of strategic planning into each partner's internal planning processes. To facilitate cooperation of SC partners in strategic planning, the hybrid planning process has been programmed into a web tool. The local planning has been supported by fuzzy logic approach so that approximate optimal solutions can be obtained avoiding difficulties of acquiring quantitative data. Through this intelligent Web based architecture, individual planning processes can be efficiently co-ordinated by means of efficient communication and visualizing consequences of a decision to be made on SC performance. Case study in a manufacturing (packaging) SC has been conducted to implement a scenario planning process for strategies on re-engineering the manufacturing SC. The research result shows that the intelligent system could be a promising tool for assisting strategic planning in a SC cooperation context.

  16. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective.

    PubMed

    Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers. PMID:26807848

  17. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective

    PubMed Central

    Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers. PMID:26807848

  18. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective.

    PubMed

    Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers.

  19. Electronic Document Supply Systems.

    ERIC Educational Resources Information Center

    Cawkell, A. E.

    1991-01-01

    Describes electronic document delivery systems used by libraries and document image processing systems used for business purposes. Topics discussed include technical specifications; analogue read-only laser videodiscs; compact discs and CD-ROM; WORM; facsimile; ADONIS (Article Delivery over Network Information System); DOCDEL; and systems at the…

  20. Production Planning and Simulation for Reverse Supply Chain

    NASA Astrophysics Data System (ADS)

    Murayama, Takeshi; Yoda, Mitsunobu; Eguchi, Toru; Oba, Fuminori

    This paper describes a production planning method for a reverse supply chain, in which a disassembly company takes reusable components from returned used products and supplies the reusable components for a product manufacturer. This method addresses the issue that the timings and quantities of returned products and reusable components obtained from them are unknown. This method first predicts the quantities of returned products and reusable components at each time period by using reliability models. Using the prediction result, the method performs production planning based on Material Requirements Planning (MRP). This method enables us to plan at each time period: the quantity of the products to be disassembled; the quantity of the reusable components to be used; and the quantity of the new components to be produced. The flow of the components and products through a forward and reverse supply chain is simulated to show the effectiveness of the method.

  1. Uninterruptible power supply (UPS) systems

    SciTech Connect

    1997-04-01

    Use of this purchase specification is not mandatory. User should review the document and determine if it meets the user`s purpose. This document contains a fill-in-the-blanks guide specification for the procurement of uninterruptible power supply (UPS) systems greater than 10 kVA, organized as follows: Parts 1 through 7--technical requirements; Appendix A--technical requirements to be included in the proposal; Appendix B--UPS system data sheets to be completed by each bidder (Seller) and submitted with the proposal; Appendix C--general guidelines giving the specifier parameters for selecting a UPS system; it should be read before preparing an actual specification, and is not attached to the specification; Attachment 1--sketches prepared by the purchaser (Owner); Attachment 2--sample title page.

  2. How to Plan Ventilation Systems.

    ERIC Educational Resources Information Center

    Clarke, John H.

    1963-01-01

    Ventilation systems for factory safety demand careful planning. The increased heat loads and new processes of industry have introduced complex ventilation problems in--(1) ventilation supply, (2) duct work design, (3) space requirements, (4) hood face velocities, (5) discharge stacks, and (6) building eddies. This article describes and diagrams…

  3. Visualisation for System Learning in Supply Chains

    ERIC Educational Resources Information Center

    Lindskog, Magnus; Abrahamsson, Mats; Aronsson, Hakan

    2007-01-01

    Contemporary supply chains are vastly complex, and decisions made by actors have system-wide consequences that these might not be able to foresee. There are gaps between "best practice"-founded theory and actual practice in supply chains. To remedy this, we argue, the supply chain actors need to enhance systems knowledge. There is a need to…

  4. Interactive Planning System

    NASA Technical Reports Server (NTRS)

    Nippert, D. A.; Beerman, T. H.; Pittenger, J. L.

    1983-01-01

    NASA Interactive Planning System (NIPS) assists program-planning groups at NASA Headquarters in developing long-range plans for total space effort. Functions involve meeting goals and objectives within time, budget, and resource-management and allocation problem.

  5. Modeling sustainability in renewable energy supply chain systems

    NASA Astrophysics Data System (ADS)

    Xie, Fei

    This dissertation aims at modeling sustainability of renewable fuel supply chain systems against emerging challenges. In particular, the dissertation focuses on the biofuel supply chain system design, and manages to develop advanced modeling framework and corresponding solution methods in tackling challenges in sustaining biofuel supply chain systems. These challenges include: (1) to integrate "environmental thinking" into the long-term biofuel supply chain planning; (2) to adopt multimodal transportation to mitigate seasonality in biofuel supply chain operations; (3) to provide strategies in hedging against uncertainty from conversion technology; and (4) to develop methodologies in long-term sequential planning of the biofuel supply chain under uncertainties. All models are mixed integer programs, which also involves multi-objective programming method and two-stage/multistage stochastic programming methods. In particular for the long-term sequential planning under uncertainties, to reduce the computational challenges due to the exponential expansion of the scenario tree, I also developed efficient ND-Max method which is more efficient than CPLEX and Nested Decomposition method. Through result analysis of four independent studies, it is found that the proposed modeling frameworks can effectively improve the economic performance, enhance environmental benefits and reduce risks due to systems uncertainties for the biofuel supply chain systems.

  6. A new bipolar Qtrim power supply system

    SciTech Connect

    Mi, C.; Bruno, D.; Drozd, J.; Nolan, T.; Orsatti, F.; Heppener, G.; Di Lieto, A.; Schultheiss, C.; Samms, T.; Zapasek, R.; Sandberg, J.

    2015-05-03

    This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.

  7. Community resiliency through recovery resource supply chain planning.

    PubMed

    Franklin, Charlotte; Todt, Kiersten

    2014-01-01

    Information in this paper is the result of recommendations and remedies developed at 'Local Supply Chain Capacity in a Crisis Summit Exercise' held in Arlington, VA on 30th-31st January,2013. At the event, which was funded through the Regional Catastrophic Preparedness Grant Program, national private sector and not-for-profit essential resource provider experts in sectors such as transportation, communication systems, energy/power, financial resources, medical supplies and other vital supplies, together with emergency managers, discussed best practices, major challenges and exchanged remedy recommendations. PMID:24578021

  8. Community resiliency through recovery resource supply chain planning.

    PubMed

    Franklin, Charlotte; Todt, Kiersten

    2014-01-01

    Information in this paper is the result of recommendations and remedies developed at 'Local Supply Chain Capacity in a Crisis Summit Exercise' held in Arlington, VA on 30th-31st January,2013. At the event, which was funded through the Regional Catastrophic Preparedness Grant Program, national private sector and not-for-profit essential resource provider experts in sectors such as transportation, communication systems, energy/power, financial resources, medical supplies and other vital supplies, together with emergency managers, discussed best practices, major challenges and exchanged remedy recommendations.

  9. HIRFL-CSR power supply system

    NASA Astrophysics Data System (ADS)

    Gao, Daqing; Zhou, Zhongzu; Chen, Youxin; Wu, Rong; Shangguan, Jingbin; Bai, Zhen

    2001-12-01

    There are more than 200 power supplies will be employed in CSR power supply system. These power supplies provide DC and pulsed exciting current for all magnets in main ring (CSRm), experiment ring (CSRe), injection line of CSRm and RIB line. Six small-scale prototypes have been designed and made before formal manufacture. One thyristor rectifier pulsed converter was delivered to Lanzhou in January and all measurement has been finished in April. The result is satisfied.

  10. Drought and Water Supply. Implications of the Massachusetts Experience for Municipal Planning.

    ERIC Educational Resources Information Center

    Russell, Clifford S.; And Others

    This book uses the 1962-66 Massachusetts drought data as a base of information to build a planning model of water resources that is of interest to students and professionals involved with water management. Using a demand-supply ratio to measure the relative inadequacy of a given water system, the authors then project demand into the drought period…

  11. Fuel supply control system for engine carburetors

    SciTech Connect

    Kishida, E.; Kobayashi, H.; Hidekazu, K.

    1986-01-14

    This patent describes a fuel supply control system for a vehicle internal combustion engine having a variable venturi type carburetor with a fixed main nozzle and a variable nozzle in which a higher suction of intake air than a predetermined rate increases the opening area of the variable nozzle. The principal component features of this system are, firstly, a separate first and second fuel supply increasing means connected to the main nozzle for selectively increasing the amount of fuel supplied through it and, secondly, a modality which can cause the first means to increase the fuel supply within a low-speed range of vehicle operation and also effect the first and second means to increase the fuel supply within a high-load range of engine operation.

  12. Water supply planning in the Lake Michigan region

    NASA Astrophysics Data System (ADS)

    Walker, Doug; Wickenkamp, Jeff

    Standing in Chicago, Illinois, and gazing across the vastness of Lake Michigan, it is hard to imagine that communities in the surrounding region could be concerned about running short of water. However, international treaties, U.S. Supreme Court decrees, and interstate agreements restrict diversions of water from the Great Lakes in an effort to maintain lake levels. This forces the region to use alternative sources of water to serve the rapidly growing population.Local governments in the southern Lake Michigan region, and likely elsewhere in the Lake Michigan region, need to acquire and integrate data and information regarding the region's water supply into planning processes.

  13. Planning Systems in Education.

    ERIC Educational Resources Information Center

    Piele, Philip

    1969-01-01

    This literature review examines 16 selected documents processed by the ERIC Clearinghouse on Educational Administration that deal with the application of several kinds of planning systems to educational programs. Particular attention is given to planning-programming-budgeting systems (PPBS), program evaluation review techniques (PERT), and various…

  14. Automated process planning system

    NASA Technical Reports Server (NTRS)

    Mann, W.

    1978-01-01

    Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.

  15. Hydrogeology and groundwater quality at monitoring wells installed for the Tunnel and Reservoir Plan System and nearby water-supply wells, Cook County, Illinois, 1995–2013

    USGS Publications Warehouse

    Kay, Robert T.

    2016-04-04

    Groundwater-quality data collected from 1995 through 2013 from 106 monitoring wells open to the base of the Silurian aquifer surrounding the Tunnel and Reservoir Plan (TARP) System in Cook County, Illinois, were analyzed by the U.S. Geological Survey, in cooperation with the Metropolitan Water Reclamation District of Greater Chicago, to assess the efficacy of the monitoring network and the effects of water movement from the tunnel system to the surrounding aquifer. Groundwater from the Silurian aquifer typically drains to the tunnel system so that analyte concentrations in most of the samples from most of the monitoring wells primarily reflect the concentration of the analyte in the nearby Silurian aquifer. Water quality in the Silurian aquifer is spatially variable because of a variety of natural and non-TARP anthropogenic processes. Therefore, the trends in analyte values at a given well from 1995 through 2013 are primarily a reflection of the spatial variation in the value of the analyte in groundwater within that part of the Silurian aquifer draining to the tunnels. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer when flow in the tunnel systemis greater than 80 million gallons per day may affect water quality in some nearby monitoring wells. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer appears to affect the values of electrical conductivity, hardness, sulfate, chloride, dissolved organic carbon, ammonia, and fecal coliform in samples from many wells but typically during less than 5 percent of the sampling events. Drainage of combined sewer flow into the aquifer is most prevalent in the downstream parts of the tunnel systems because of the hydraulic pressures elevated above background values and long residence time of combined sewer flow in those areas. Elevated values of the analytes emplaced during intermittent migration of combined sewer flow into the Silurian aquifer

  16. Hydrogeology and groundwater quality at monitoring wells installed for the Tunnel and Reservoir Plan System and nearby water-supply wells, Cook County, Illinois, 1995–2013

    USGS Publications Warehouse

    Kay, Robert T.

    2016-01-01

    Groundwater-quality data collected from 1995 through 2013 from 106 monitoring wells open to the base of the Silurian aquifer surrounding the Tunnel and Reservoir Plan (TARP) System in Cook County, Illinois, were analyzed by the U.S. Geological Survey, in cooperation with the Metropolitan Water Reclamation District of Greater Chicago, to assess the efficacy of the monitoring network and the effects of water movement from the tunnel system to the surrounding aquifer. Groundwater from the Silurian aquifer typically drains to the tunnel system so that analyte concentrations in most of the samples from most of the monitoring wells primarily reflect the concentration of the analyte in the nearby Silurian aquifer. Water quality in the Silurian aquifer is spatially variable because of a variety of natural and non-TARP anthropogenic processes. Therefore, the trends in analyte values at a given well from 1995 through 2013 are primarily a reflection of the spatial variation in the value of the analyte in groundwater within that part of the Silurian aquifer draining to the tunnels. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer when flow in the tunnel systemis greater than 80 million gallons per day may affect water quality in some nearby monitoring wells. Intermittent drainage of combined sewer flow from the tunnel system to the Silurian aquifer appears to affect the values of electrical conductivity, hardness, sulfate, chloride, dissolved organic carbon, ammonia, and fecal coliform in samples from many wells but typically during less than 5 percent of the sampling events. Drainage of combined sewer flow into the aquifer is most prevalent in the downstream parts of the tunnel systems because of the hydraulic pressures elevated above background values and long residence time of combined sewer flow in those areas. Elevated values of the analytes emplaced during intermittent migration of combined sewer flow into the Silurian aquifer

  17. Coal slurry fuel supply and purge system

    DOEpatents

    McDowell, Robert E.; Basic, Steven L.; Smith, Russel M.

    1994-01-01

    A coal slurry fuel supply and purge system for a locomotive engines is disclosed which includes a slurry recirculation path, a stand-by path for circulating slurry during idle or states of the engine when slurry fuel in not required by the engine, and an engine header fluid path connected to the stand-by path, for supplying and purging slurry fuel to and from fuel injectors. A controller controls the actuation of valves to facilitate supply and purge of slurry to and from the fuel injectors. A method for supplying and purging coal slurry in a compression ignition engine is disclosed which includes controlling fluid flow devices and valves in a plurality of fluid paths to facilitate continuous slurry recirculation and supply and purge of or slurry based on the operating state of the engine.

  18. The imperative for stronger vaccine supply and logistics systems.

    PubMed

    Zaffran, Michel; Vandelaer, Jos; Kristensen, Debra; Melgaard, Bjørn; Yadav, Prashant; Antwi-Agyei, K O; Lasher, Heidi

    2013-04-18

    With the introduction of new vaccines, developing countries are facing serious challenges in their vaccine supply and logistics systems. Storage capacity bottlenecks occur at national, regional, and district levels and system inefficiencies threaten vaccine access, availability, and quality. As countries adopt newer and more expensive vaccines and attempt to reach people at different ages and in new settings, their logistics systems must be strengthened and optimized. As a first step, national governments, donors, and international agencies have crafted a global vision for 2020 vaccine supply and logistics systems with detailed plans of action to achieve five priority objectives. Vaccine products and packaging are designed to meet the needs of developing countries. Immunization supply systems support efficient and effective vaccine delivery. The environmental impact of energy, materials, and processes used in immunization systems is minimized. Immunization information systems enable better and more timely decision-making. Competent and motivated personnel are empowered to handle immunization supply chain issues. Over the next decade, vaccine supply and logistics systems in nearly all developing countries will require significant investments of time and resources from global and national partners, donors, and governments. These investments are critical if we are to reach more people with current and newer vaccines. PMID:23598495

  19. The imperative for stronger vaccine supply and logistics systems.

    PubMed

    Zaffran, Michel; Vandelaer, Jos; Kristensen, Debra; Melgaard, Bjørn; Yadav, Prashant; Antwi-Agyei, K O; Lasher, Heidi

    2013-04-18

    With the introduction of new vaccines, developing countries are facing serious challenges in their vaccine supply and logistics systems. Storage capacity bottlenecks occur at national, regional, and district levels and system inefficiencies threaten vaccine access, availability, and quality. As countries adopt newer and more expensive vaccines and attempt to reach people at different ages and in new settings, their logistics systems must be strengthened and optimized. As a first step, national governments, donors, and international agencies have crafted a global vision for 2020 vaccine supply and logistics systems with detailed plans of action to achieve five priority objectives. Vaccine products and packaging are designed to meet the needs of developing countries. Immunization supply systems support efficient and effective vaccine delivery. The environmental impact of energy, materials, and processes used in immunization systems is minimized. Immunization information systems enable better and more timely decision-making. Competent and motivated personnel are empowered to handle immunization supply chain issues. Over the next decade, vaccine supply and logistics systems in nearly all developing countries will require significant investments of time and resources from global and national partners, donors, and governments. These investments are critical if we are to reach more people with current and newer vaccines.

  20. Coupling pre-season famers planning and optimal water supply management to mitigate climate change impacts

    NASA Astrophysics Data System (ADS)

    Castelletti, A.; Giuliani, M.; Mainardi, M.; Chiaradia, E.; Gandolfi, C.

    2012-12-01

    Agriculture is the main land use in the world and also the sector characterized by the highest water demand. To meet projected growth in human population and per-capita food demand, agricultural production will have to significantly increase in the next decades. Farmers' practices are significantly sensitive to climate variations. To effectively face a changing climate, adaptation strategies are essential and many potential options are available for marginal changes of existing agricultural systems: changing crop type and rotation, shifting sowing and harvesting dates, adopting high efficiency irrigation techniques. Yet, farmer adaptation is only one part of the equation. Adaptation also concerns the supply system, in particular the reallocation of water availability in space and time, Changes in water supply management strategies might impact on farmer decisions altering water availability. Most of the studies in the literature consider the two systems separately either analysing the impact of climate change of farmers decisions and demand formation for a given water supply scenario or optimizing water supply for several water demand scenarios. In this study we close the loop between supply and demand by explicitly studying the coevolution of farmers and water supply systems under climate changes. Given an expected water availability, the farmers solve a yearly planning problem to decide the most profitable crop to plant. Knowing the farmers decisions, the operation of the water supply system is optimized on the actual water demand of the crops. Then, the farmers can re-adapt their decisions according with the new optimal operating strategy, thus activating an information loop between the two systems that exchange expected supply and irrigation demand. Projected hydro-climatic scenarios are used as boundary conditions to the loop. The proposed approach is demonstrated on a real-world case study, namely the Lake Como that serves the Muzza-Bassa Lodigiana irrigation

  1. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience. PMID:21177223

  2. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  3. ISABELLE magnet power supply system performance analysis

    SciTech Connect

    Edwards, R.J.

    1981-01-01

    The power supply system that will energize the superconducting magnets in the ISABELLE 400 x 400 GeV accelerator must supply various voltages and currents. The voltages for the correction winding range from ten to one hundred twenty-five volts unipolar and bipolar with current rating of 50 to 300 amperes. The main field winding requires voltages from 90V (at flattop) to 600V during maximum ramp rate or acceleration cycle. The power supplies are programmable over their full range of output current with a reproducibility error varying from +- 10 ppM to +- 400 ppM of full scale. Included within the reproducibility error are the long and short term stability requirements of the power supplies. The purpose of this paper is to define some of the design goals and outline the approach taken in reaching these goals.

  4. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    PubMed

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  5. Water supply studies. [management and planning of water supplies in California

    NASA Technical Reports Server (NTRS)

    Burgy, R. H.; Algazi, V. R.; Draeger, W. C.; Churchman, C. W.; Thomas, R. W.; Lauer, D. T.; Hoos, I.; Krumpe, P. F.; Nichols, J. D.; Gialdini, M. J.

    1973-01-01

    The primary test site for water supply investigations continues to be the Feather River watershed in northeastern California. This test site includes all of the area draining into and including the Oroville Reservoir. The principal effort is to determine the extent to which remote sensing techniques, when properly employed, can provide information useful to those persons concerned with the management and planning of lands and facilities for the production of water, using the Oroville Reservoir and the California Water Project as the focus for the study. In particular, emphasis is being placed on determining the cost effectiveness of information derived through remote sensing as compared with that currently being derived through more conventional means.

  6. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  7. Strategic Enterprise Resource Planning for Global Supply Chain Competitiveness

    ERIC Educational Resources Information Center

    Nageswararao, A. V.; Sahu, Dasarathi; Mohan, V. Krishna

    2011-01-01

    Strategic Enterprise Resource planning (SERP) systems are networked and integrated information mechanisms which are developed to achieve competitive advantage for organizations operating in global scale. It plays a vital role in Integrating various stake holders and channel partners involved in day to day operations. In the present Globalized…

  8. Mission planning for autonomous systems

    NASA Technical Reports Server (NTRS)

    Pearson, G.

    1987-01-01

    Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.

  9. Planning Systems for Distributed Operations

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  10. 24 CFR 3285.605 - Fuel supply system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Fuel supply system. 3285.605... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems § 3285.605 Fuel supply system. (a) Proper supply pressure. The gas piping system in the home...

  11. 24 CFR 3285.605 - Fuel supply system.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Fuel supply system. 3285.605... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems § 3285.605 Fuel supply system. (a) Proper supply pressure. The gas piping system in the home...

  12. Planning the bioterrorism response supply chain: learn and live.

    PubMed

    Brandeau, Margaret L; Hutton, David W; Owens, Douglas K; Bravata, Dena M

    2007-01-01

    Responses to bioterrorism require rapid procurement and distribution of medical and pharmaceutical supplies, trained personnel, and information. Thus, they present significant logistical challenges. On the basis of a review of the manufacturing and service supply chain literature, the authors identified five supply chain strategies that can potentially increase the speed of response to a bioterrorism attack, reduce inventories, and save money: effective supply chain network design; effective inventory management; postponement of product customization and modularization of component parts; coordination of supply chain stakeholders and appropriate use of incentives; and effective information management. The authors describe how concepts learned from published evaluations of manufacturing and service supply chains, as well as lessons learned from responses to natural disasters, naturally occurring outbreaks, and the 2001 US anthrax attacks, can be applied to design, evaluate, and improve the bioterrorism response supply chain. Such lessons could also be applied to the response supply chains for disease outbreaks and natural and manmade disasters.

  13. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction work plans-power supply borrowers. 1710... LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.252 Construction work plans..., environmental and other studies and plans needed to support the construction of facilities, when such cost...

  14. Fluid-bed air-supply system

    DOEpatents

    Atabay, Keramettin

    1979-01-01

    The air-supply system for a fluidized-bed furnace includes two air conduits for the same combustion zone. The conduits feed separate sets of holes in a distributor plate through which fluidizing air flows to reach the bed. During normal operation, only one conduit and set of holes is used, but the second conduit and set of holes is employed during start-up.

  15. Mobile systems capability plan

    SciTech Connect

    1996-09-01

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

  16. Engine powered auxiliary air supply system

    SciTech Connect

    Mc Lean, J.R.

    1987-01-27

    This patent describes an auxiliary air supply system comprising: an engine; at least one exhaust driven turbocharger including a turbine and a compressor associated therewith for supply of compressed air to the engine; a low pressure compressor including means for powering the low pressure compressor utilizing the engine exhaust gas and flow connected to receive a portion of the compressed air exiting the engine turbocharger compressor; a high pressure compressor including means for powering the high pressure compressor utilizing the engine exhaust gas and flow connected to receive the compressed air exiting the low pressure compressor; and means for directing engine exhaust gases between at least one engine turbocharger and the means for powering the low and high pressure compressors.

  17. Ultracapacitor-Based Uninterrupted Power Supply System

    NASA Technical Reports Server (NTRS)

    Eichenberg, Dennis J.

    2011-01-01

    The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less

  18. Workforce planning for DOE/EM: Assessing workforce demand and supply

    SciTech Connect

    Lewis, R.E.; Ulibarri, C.A.

    1993-10-01

    The US Department of Energy (DOE) has committed to bringing its facilities into regulatory compliance and restoring the environment of sites under its control by the year 2019. Responsibility for accomplishing this goal is vested with the Office of Environmental Restoration and Waste Management (EM). Concerns regarding the availability of workers with the necessary technical skills and the prospect of retraining workers from other programs within DOE or other industries are addressed in this report in several ways. First, various workforce projections relevant to EM occupations are compared to determine common findings and resolve inconsistencies. Second, case studies, interviews, and published data are used to examine the potential availability of workers for these occupations via occupational mobility, training/retraining options, and salary adjustments. Third, demand and supply factors are integrated in a framework useful for structuring workforce analyses. The analyses demonstrate that workforce skills are not anticipated to change due to the change in mission; science, engineering, and technician occupations tend to be mobile within and across occupational categories; experience and on-the-job training are more crucial to issues of worker supply than education; and, the clarity of an organization`s mission, budget allocation process, work implementation and task assignment systems are critical determinants of both workforce need and supply. DOE is encouraged to create a more stable platform for workforce planning by resolving organizational and institutional hindrances to accomplishing work and capitalizing on workforce characteristics besides labor {open_quotes}supply{close_quotes} and demographics.

  19. [Remote radiation planning support system].

    PubMed

    Atsumi, Kazushige; Nakamura, Katsumasa; Yoshidome, Satoshi; Shioyama, Yoshiyuki; Sasaki, Tomonari; Ohga, Saiji; Yoshitake, Tadamasa; Shinoto, Makoto; Asai, Kaori; Sakamoto, Katsumi; Hirakawa, Masakazu; Honda, Hiroshi

    2012-08-01

    We constructed a remote radiation planning support system between Kyushu University Hospital (KUH) in Fukuoka and Kyushu University Beppu Hospital (KBH) in Oita. Between two institutions, radiology information system for radiotherapy division (RT-RIS) and radiation planning system (RTPS) were connected by virtual private network (VPN). This system enables the radiation oncologists at KUH to perform radiotherapy planning for the patients at KBH. The detail of the remote radiation planning support system in our institutions is as follows: The radiation oncologist at KBH performs radiotherapy planning and the data of the patients are sent anonymously to the radiation oncologists at KUH. The radiation oncologists at KUH receive the patient's data, access to RTPS at KBH, verify or change the radiation planning at KBH: Radiation therapy is performed at KBH according to the confirmed plan by the radiation oncologists at KUH. Our remote radiation planning system is useful for providing radiation therapy with safety and accuracy.

  20. 77 FR 39745 - Fuel Oil Systems for Emergency Power Supplies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... COMMISSION Fuel Oil Systems for Emergency Power Supplies AGENCY: Nuclear Regulatory Commission. ACTION: Draft... Power Supplies.'' This guide describes a method that the NRC staff considers acceptable for use in..., entitled, ``Fuel Oil Systems for Emergency Power Supplies,'' is temporarily identified by its task...

  1. 24 CFR 3280.704 - Fuel supply systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Systems § 3280.704 Fuel supply systems. (a) LP—Gas system design and service line pressure. (1) Systems... have a design pressure of at least 312.5 psig. (i) Container supply systems shall be arranged for vapor... such openings. (6) LP-gas system enclosure and mounting. (i) Housings and enclosures shall be...

  2. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  3. CBTL Design Case Summary Conventional Feedstock Supply System - Herbaceous

    SciTech Connect

    Christopher T. Wright; Erin M. Searcy

    2012-02-01

    A conventional bale feedstock design has been established that represents supply system technologies, costs, and logistics that are achievable today for supplying herbaceous feedstocks as a blendstock with coal for energy production. Efforts are made to identify bottlenecks and optimize the efficiency and capacities of this supply system, within the constraints of existing local feedstock supplies, equipment, and permitting requirements. The feedstock supply system logistics operations encompass all of the activities necessary to move herbaceous biomass feedstock from the production location to the conversion reactor ready for blending and insertion. This supply system includes operations that are currently available such that costs and logistics are reasonable and reliable. The system modeled for this research project includes the uses of field-dried corn stover or switchgrass as a feedstock to annually supply an 800,000 DM ton conversion facility.

  4. A tale of integrated regional water supply planning: Meshing socio-economic, policy, governance, and sustainability desires together

    NASA Astrophysics Data System (ADS)

    Asefa, Tirusew; Adams, Alison; Kajtezovic-Blankenship, Ivana

    2014-11-01

    In 1998, Tampa Bay Water, the largest wholesale water provider in South East USA with over 2.3 million customers, assumed the role of planning, developing, and operating water supply sources from six local water supply utilities through an Interlocal Agreement. Under the agreement, cities and counties served by the agency would have their water supply demands met unequivocally and share the cost of delivery and/or development of new supplies based on their consumption, allowing a more holistic approach to manage resources in the region. Consequently, the agency was able to plan and execute several components of its Long-Term Master Water Plan to meet the region's demand, as well as diversify its sources of water supply. Today, the agency manages a diverse and regionally interconnected water supply system that includes 13 wellfields, two surface water supply sources, off-site reservoir storage, a sea water desalination plant, a surface water treatment plant, and 14 pumping/booster stations. It delivers water through 390 km of large diameter pipe to 19 potable water connections. It uses state-of-the-practice computer tools to manage short and long-term operations and planning. As a result, after the agency's inception, groundwater pumpage was reduced by more than half in less than a decade-by far one of the largest cutback and smaller groundwater utilization rate compared to other utilities in Florida or elsewhere. The region was able to witness a remarkable recovery in lake and wetland water levels through the agency's use of this diverse mix of supply sources. For example, in the last three years, 45-65% of water supply came from groundwater sources, 35-45% from surface water sources and 1-9% from desalinated seawater-very different from 100% groundwater only supply just few years ago. As an "on demand" wholesale water provider, the agency forecasts water supply availability and expected water demands from seasonal to decadal time frames using a suite of

  5. 24 CFR 3280.704 - Fuel supply systems.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the tank shutoff valve. The fuel oil filter or strainer shall contain a sump with a drain for the... outlet of an oil supply tank. The valve shall be installed to close against the supply. (4) Fuel oil... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Fuel supply systems....

  6. 24 CFR 3280.704 - Fuel supply systems.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the tank shutoff valve. The fuel oil filter or strainer shall contain a sump with a drain for the... outlet of an oil supply tank. The valve shall be installed to close against the supply. (4) Fuel oil... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Fuel supply systems....

  7. 24 CFR 3280.704 - Fuel supply systems.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the tank shutoff valve. The fuel oil filter or strainer shall contain a sump with a drain for the... outlet of an oil supply tank. The valve shall be installed to close against the supply. (4) Fuel oil... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Fuel supply systems....

  8. The Perceptions of the Automotive Supply Industry Related to Information Technology Utilization and Creating Barriers to Competitive Market Entry: A Case Study of the Implications for Strategic Planning

    ERIC Educational Resources Information Center

    Cargal, Joseph L.

    2010-01-01

    The purpose of this study was to examine information technology/systems strategy related factors in the automotive supply industry based on responses to the Strategic Planning and Business Performance Survey provided to automotive suppliers. This population produces supplies to the automotive industry with products valued at hundreds of billions…

  9. Direct current uninterruptible power supply method and system

    DOEpatents

    Sinha, Gautam

    2003-12-02

    A method and system are described for providing a direct current (DC) uninterruptible power supply with the method including, for example: continuously supplying fuel to a turbine; converting mechanical power from the turbine into alternating current (AC) electrical power; converting the AC electrical power to DC power within a predetermined voltage level range; supplying the DC power to a load; and maintaining a DC load voltage within the predetermined voltage level range by adjusting the amount of fuel supplied to the turbine.

  10. Magnetically switched power supply system for lasers

    NASA Technical Reports Server (NTRS)

    Pacala, Thomas J. (Inventor)

    1987-01-01

    A laser power supply system is described in which separate pulses are utilized to avalanche ionize the gas within the laser and then produce a sustained discharge to cause the gas to emit light energy. A pulsed voltage source is used to charge a storage device such as a distributed capacitance. A transmission line or other suitable electrical conductor connects the storage device to the laser. A saturable inductor switch is coupled in the transmission line for containing the energy within the storage device until the voltage level across the storage device reaches a predetermined level, which level is less than that required to avalanche ionize the gas. An avalanche ionization pulse generating circuit is coupled to the laser for generating a high voltage pulse of sufficient amplitude to avalanche ionize the laser gas. Once the laser gas is avalanche ionized, the energy within the storage device is discharged through the saturable inductor switch into the laser to provide the sustained discharge. The avalanche ionization generating circuit may include a separate voltage source which is connected across the laser or may be in the form of a voltage multiplier circuit connected between the storage device and the laser.

  11. Electric utility system master plan

    SciTech Connect

    Erickson, O.M.

    1992-10-01

    This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

  12. CBTL Design Case Summary Conventional Feedstock Supply System - Woody

    SciTech Connect

    Christopher T. Wright; Erin M. Searcy

    2012-02-01

    A conventional woody feedstock design has been developed that represents supply system technologies, costs, and logistics that are achievable today for supplying woody biomass as a blendstock with coal for energy production. Efforts are made to identify bottlenecks and optimize the efficiency and capacities of this supply system, within the constraints and consideration of existing local feedstock supplies, equipment, and permitting requirements. The feedstock supply system logistics operations encompass all of the activities necessary to move woody biomass from the production location to the conversion reactor ready for blending and insertion. This supply system includes operations that are currently available such that costs and logistics are reasonable and reliable. The system modeled for this research project includes the use of the slash stream since it is a more conservative analysis and represents the material actually used in the experimental part of the project.

  13. Manager's assistant systems for space system planning

    NASA Technical Reports Server (NTRS)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  14. 49 CFR 236.1015 - PTC Safety Plan content requirements and PTC System Certification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... § 236.1005; (19) An emergency and planned maintenance temporary rerouting plan indicating how operations... supplied from other business systems needed to execute the braking algorithm, survey data needed...

  15. 40 CFR 160.45 - Test system supply facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Test system supply facilities. 160.45 Section 160.45 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Facilities § 160.45 Test system supply facilities. (a) There...

  16. Microflora of drinking water distributed through decentralized supply systems (Tomsk)

    NASA Astrophysics Data System (ADS)

    Khvaschevskaya, A. A.; Nalivaiko, N. G.; Shestakova, A. V.

    2016-03-01

    The paper considers microbiological quality of waters from decentralized water supply systems in Tomsk. It has been proved that there are numerous microbial contaminants of different types. The authors claim that the water distributed through decentralized supply systems is not safe to drink without preliminary treatment.

  17. Institutional Planning: A Systems Approach.

    ERIC Educational Resources Information Center

    Adamson, Willie D.

    This four-chapter report explores the possible contributions of a systems approach to institutional planning. After introductory comments, Chapter I reviews the management theory of Henry Fayol, which emphasizes management tasks, such as planning, organizing, commanding, coordinating, and controlling, which are "universal" regardless of the level…

  18. Isotopic metrics for structure, connectivity, and residence time in urban water supply systems

    NASA Astrophysics Data System (ADS)

    Bowen, Gabriel; Kennedy, Casey; Good, Stephen; Ehleringer, James

    2014-05-01

    Public water supply systems are the life-blood of urban areas, accessing, managing, and distributing water from an often complex array of sources to provide on-demand access to safe, potable water at the point-of-use. Water managers are faced with a wide range of potential threats, ranging from climate change to infrastructure failure to supply contamination. Information on the structure of supply and conveyance systems, connectivity within these systems, and links between the point-of-use and environmental water sources are thus critical to assessing the stability of water supplies and responding efficiently and effectively to water supply threats. We report datasets documenting stable hydrogen and oxygen isotope ratios of public supply water in cities of the United States across a range of scales. The data show a wide range of spatial and temporal variability that can be attributed to a combination of regional hydroclimate and water supply characteristics. Comparisons of public supply waters with model-based estimates of the isotopic composition of regional water sources suggests that major factors reflected in the tap water data include the degree of fragmentation of natural and man-made storage and conveyance systems, inter-basinal transfer of water, evaporative losses, and the total residence time of the natural and artificial systems being exploited. Because each of these factors contributes to determining the sustainability of water supply systems and their sensitivity to environmental disturbance, we propose a set of isotope-based metrics that can be used to efficiently assess and monitor the characteristics of public-supply systems in water security assessments and in support of management, planning, and outreach activities.

  19. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Construction work plans-power supply borrowers. 1710.252 Section 1710.252 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO...

  20. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Construction work plans-power supply borrowers. 1710.252 Section 1710.252 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO...

  1. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Construction work plans-power supply borrowers. 1710.252 Section 1710.252 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO...

  2. Data Science in Supply Chain Management: Data-Related Influences on Demand Planning

    ERIC Educational Resources Information Center

    Jin, Yao

    2013-01-01

    Data-driven decisions have become an important aspect of supply chain management. Demand planners are tasked with analyzing volumes of data that are being collected at a torrential pace from myriad sources in order to translate them into actionable business intelligence. In particular, demand volatilities and planning are vital for effective and…

  3. Family Planning Supply Environment in Kinshasa, DRC: Survey Findings and Their Value in Advancing Family Planning Programming

    PubMed Central

    Kayembe, Patrick; Babazadeh, Saleh; Dikamba, Nelly; Akilimali, Pierre; Hernandez, Julie; Binanga, Arsene; Bertrand, Jane T

    2015-01-01

    Background: Modern contraceptive prevalence was 14.1% in 2007 in Kinshasa, the capital city of the Democratic Republic of the Congo (DRC). Yet virtually nothing was known about the family planning supply environment. Methods: Three surveys of health facilities were conducted in 2012, 2013, and 2014 to determine the number, spatial distribution, and attributes of sites providing family planning services. The 2012 and 2013 surveys aimed to identify the universe of family planning facilities while obtaining a limited set of data on “readiness” to provide family planning services (defined as having at least 3 modern methods, at least 1 person training in family planning in the last 3 years, and an information system to track distribution of products to clients) and output (measured by couple-years of protection, or CYP). In contrast, the 2014 survey, conducted under the umbrella of the Performance Monitoring and Accountability 2020 (PMA2020) project, was based on 2-stage cluster sampling. This article provides detailed analysis of the 2012 and 2013 surveys, including bivariate and multivariate analysis of correlates of readiness to provide services and of output. Results: We identified 184 health facilities that reported providing at least 1 contraceptive method in 2012 and 395 facilities in 2013. The percentage of sites defined as “ready” to provide services increased from 44.1% in 2012 to 63.3% in 2013. For the 3-month period between January and March 2013, facilities distributed between 0 and 879.2 CYP (mean, 39.7). Nearly half (49%) of the CYP was attributable to implants, followed by IUDs (24%), CycleBeads (11%), and injectables (8%). In 2013, facilities supported by PEPFAR (n = 121) were more likely than other facilities to be rated as ready to provide services (P<.0001); however, PEPFAR-supported sites generated less CYP on average than sites supported by family planning implementing agencies (P<.0001). Multivariate analysis showed 3 variables were

  4. Conducting Sanitary Surveys of Water Supply Systems. Student Workbook.

    ERIC Educational Resources Information Center

    1976

    This workbook is utilized in connection with a 40-hour course on sanitary surveys of water supply systems for biologists, chemists, and engineers with experience as a water supply evaluator. Practical training is provided in each of the 21 self-contained modules. Each module outlines the purpose, objectives and content for that section. The course…

  5. [Relationship between water supply, sanitation, public health, and environment: elements for the formulation of a sanitary infrastructure planning model].

    PubMed

    Soares, Sérgio R A; Bernardes, Ricardo S; Netto, Oscar de M Cordeiro

    2002-01-01

    The understanding of sanitation infrastructure, public health, and environmental relations is a fundamental assumption for planning sanitation infrastructure in urban areas. This article thus suggests elements for developing a planning model for sanitation infrastructure. The authors performed a historical survey of environmental and public health issues related to the sector, an analysis of the conceptual frameworks involving public health and sanitation systems, and a systematization of the various effects that water supply and sanitation have on public health and the environment. Evaluation of these effects should guarantee the correct analysis of possible alternatives, deal with environmental and public health objectives (the main purpose of sanitation infrastructure), and provide the most reasonable indication of actions. The suggested systematization of the sanitation systems effects in each step of their implementation is an advance considering the association between the fundamental elements for formulating a planning model for sanitation infrastructure.

  6. Development of an integrated medical supply information system

    NASA Astrophysics Data System (ADS)

    Xu, Eric; Wermus, Marek; Blythe Bauman, Deborah

    2011-08-01

    The integrated medical supply inventory control system introduced in this study is a hybrid system that is shaped by the nature of medical supply, usage and storage capacity limitations of health care facilities. The system links demand, service provided at the clinic, health care service provider's information, inventory storage data and decision support tools into an integrated information system. ABC analysis method, economic order quantity model, two-bin method and safety stock concept are applied as decision support models to tackle inventory management issues at health care facilities. In the decision support module, each medical item and storage location has been scrutinised to determine the best-fit inventory control policy. The pilot case study demonstrates that the integrated medical supply information system holds several advantages for inventory managers, since it entails benefits of deploying enterprise information systems to manage medical supply and better patient services.

  7. Nascom System Development Plan: System Description, Capabilities and Plans

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

  8. Planning ATES systems under uncertainty

    NASA Astrophysics Data System (ADS)

    Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin

    2015-04-01

    Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions

  9. Sunlight supply and gas exchange systems in microalgal bioreactor

    NASA Technical Reports Server (NTRS)

    Mori, K.; Ohya, H.; Matsumoto, K.; Furune, H.

    1987-01-01

    The bioreactor with sunlight supply system and gas exchange systems presented has proved feasible in ground tests and shows much promise for space use as a closed ecological life support system device. The chief conclusions concerning the specification of total system needed for a life support system for a man in a space station are the following: (1) Sunlight supply system - compactness and low electrical consumption; (2) Bioreactor system - high density and growth rate of chlorella; and (3) Gas exchange system - enough for O2 production and CO2 assimilation.

  10. The Complex Economic System of Supply Chain Financing

    NASA Astrophysics Data System (ADS)

    Zhang, Lili; Yan, Guangle

    Supply Chain Financing (SCF) refers to a series of innovative and complicated financial services based on supply chain. The SCF set-up is a complex system, where the supply chain management and Small and Medium Enterprises (SMEs) financing services interpenetrate systematically. This paper establishes the organization structure of SCF System, and presents two financing models respectively, with or without the participation of the third-party logistic provider (3PL). Using Information Economics and Game Theory, the interrelationship among diverse economic sectors is analyzed, and the economic mechanism of development and existent for SCF system is demonstrated. New thoughts and approaches to solve SMEs financing problem are given.

  11. Intelligent vehicle electrical power supply system with central coordinated protection

    NASA Astrophysics Data System (ADS)

    Yang, Diange; Kong, Weiwei; Li, Bing; Lian, Xiaomin

    2016-07-01

    The current research of vehicle electrical power supply system mainly focuses on electric vehicles (EV) and hybrid electric vehicles (HEV). The vehicle electrical power supply system used in traditional fuel vehicles is rather simple and imperfect; electrical/electronic devices (EEDs) applied in vehicles are usually directly connected with the vehicle's battery. With increasing numbers of EEDs being applied in traditional fuel vehicles, vehicle electrical power supply systems should be optimized and improved so that they can work more safely and more effectively. In this paper, a new vehicle electrical power supply system for traditional fuel vehicles, which accounts for all electrical/electronic devices and complex work conditions, is proposed based on a smart electrical/electronic device (SEED) system. Working as an independent intelligent electrical power supply network, the proposed system is isolated from the electrical control module and communication network, and access to the vehicle system is made through a bus interface. This results in a clean controller power supply with no electromagnetic interference. A new practical battery state of charge (SoC) estimation method is also proposed to achieve more accurate SoC estimation for lead-acid batteries in traditional fuel vehicles so that the intelligent power system can monitor the status of the battery for an over-current state in each power channel. Optimized protection methods are also used to ensure power supply safety. Experiments and tests on a traditional fuel vehicle are performed, and the results reveal that the battery SoC is calculated quickly and sufficiently accurately for battery over-discharge protection. Over-current protection is achieved, and the entire vehicle's power utilization is optimized. For traditional fuel vehicles, the proposed vehicle electrical power supply system is comprehensive and has a unified system architecture, enhancing system reliability and security.

  12. Intelligent vehicle electrical power supply system with central coordinated protection

    NASA Astrophysics Data System (ADS)

    Yang, Diange; Kong, Weiwei; Li, Bing; Lian, Xiaomin

    2016-05-01

    The current research of vehicle electrical power supply system mainly focuses on electric vehicles (EV) and hybrid electric vehicles (HEV). The vehicle electrical power supply system used in traditional fuel vehicles is rather simple and imperfect; electrical/electronic devices (EEDs) applied in vehicles are usually directly connected with the vehicle's battery. With increasing numbers of EEDs being applied in traditional fuel vehicles, vehicle electrical power supply systems should be optimized and improved so that they can work more safely and more effectively. In this paper, a new vehicle electrical power supply system for traditional fuel vehicles, which accounts for all electrical/electronic devices and complex work conditions, is proposed based on a smart electrical/electronic device (SEED) system. Working as an independent intelligent electrical power supply network, the proposed system is isolated from the electrical control module and communication network, and access to the vehicle system is made through a bus interface. This results in a clean controller power supply with no electromagnetic interference. A new practical battery state of charge (SoC) estimation method is also proposed to achieve more accurate SoC estimation for lead-acid batteries in traditional fuel vehicles so that the intelligent power system can monitor the status of the battery for an over-current state in each power channel. Optimized protection methods are also used to ensure power supply safety. Experiments and tests on a traditional fuel vehicle are performed, and the results reveal that the battery SoC is calculated quickly and sufficiently accurately for battery over-discharge protection. Over-current protection is achieved, and the entire vehicle's power utilization is optimized. For traditional fuel vehicles, the proposed vehicle electrical power supply system is comprehensive and has a unified system architecture, enhancing system reliability and security.

  13. Planning for an Individual Water System. Fourth Edition Revised.

    ERIC Educational Resources Information Center

    Turner, J. Howard, Ed.

    Few investments have as little thought given to planning as the installation of a water-supply system for the home or farm. There are many considerations to be made if an adequate supply of water is to be available for the living and recreational needs of a family or the needs of livestock. This book is designed to instruct the reader on how to…

  14. Recirculating Molten Metal Supply System And Method

    DOEpatents

    Kinosz, Michael J.; Meyer, Thomas N.

    2003-07-01

    The melter furnace includes a heating chamber (16), a pump chamber (18), a degassing chamber (20), and a filter chamber (22). The pump chamber (18) is located adjacent the heating chamber (16) and houses a molten metal pump (30). The degassing chamber (20) is located adjacent and in fluid communication with the pump chamber (18), and houses a degassing mechanism (36). The filter chamber (22) is located adjacent and in fluid communication with the degassing chamber (20). The filter chamber (22) includes a molten metal filter (38). The melter furnace (12) is used to supply molten metal to an externally located holder furnace (14), which then recirculates molten metal back to the melter furnace (12).

  15. Public timber supply, market adjustments, and local economies: economic assumptions of the Northwest Forest Plan.

    PubMed

    Power, Thomas Michael

    2006-04-01

    The Northwest Forest Plan in the Pacific Northwest sought to stabilize local economies, including local employment and income, by stabilizing the flow of wood fiber from public forests. This is also a common forest management objective in other regions and countries. Because this economic strategy ignores basic market adjustments, it is likely to fail and to unnecessarily damage forest ecosystems. Application of basic economic principles on how markets operate significantly changes the apparent efficacy of efforts to manage local economies by managing timber supply. The emphasis on timber supply tends to ignore the dominant role that the demand for wood fiber and wood products, rather than wood-fiber supply, plays in determining levels of harvest and production. Contemporary economics indicates that markets tend to operate to offset reductions in wood-fiber supply. This significantly moderates the economic cost of reducing commercial timber harvest in the pursuit of environmental objectives. In addition, contemporary economic analysis indicates that the economic links between natural forests and local communities are much broader than simply the flow of commercially valuable logs to manufacturing facilities. At least in the United States, the flow of environmental services from natural forests has increasingly become an amenity that has drawn people and economic activity to forested areas. Attractive site-specific qualities, including those supported by natural forests, can potentially support local economic development even in the face of reduced timber harvests. These market-related adjustments partially explain the Northwest Forest Plan's overestimation of the expected regional impacts associated with reduced federal timber supply and the ineffectiveness of the plan's efforts to protect communities by stabilizing federal timber supply PMID:16903095

  16. Incorporating long-term trends in water availability in water supply planning.

    PubMed

    Luketina, D; Bender, M

    2002-01-01

    This paper examines factors affecting water availability and hydrological trends of water supply. The relative impacts of the different factors have been assessed on a planning time frame of around 30 years. It is demonstrated that the non-greenhouse processes of multi-decadal climate change and el Niño-la Niña climate change will almost certainly be more significant than greenhouse induced climate change. Further, in developing countries, increased water consumption, population growth, and urbanization are likely to be the dominant factors when considering water availability. The type of responses that a water supply organization can make are discussed.

  17. Planning water supply under uncertainty - benefits and limitations of RDM, Info-Gap, economic optimization and many-objective optimization

    NASA Astrophysics Data System (ADS)

    Matrosov, E.; Padula, S.; Huskova, I.; Harou, J. J.

    2012-12-01

    Population growth and the threat of drier or changed climates are likely to increase water scarcity world-wide. A combination of demand management (water conservation) and new supply infrastructure is often needed to meet future projected demands. In this case system planners must decide what to implement, when and at what capacity. Choices can range from infrastructure to policies or a mix of the two, culminating in a complex planning problem. Decision making under uncertainty frameworks can be used to help planners with this planning problem. This presentation introduces, applies and compares four decision making under uncertainty frameworks. The application is to the Thames basin water resource system which includes the city of London. The approaches covered here include least-economic cost capacity expansion optimization (EO), Robust Decision Making (RDM), Info-Gap Decision Theory (Info-gap) and many-objective evolutionary optimization (MOEO). EO searches for the least-economic cost program, i.e. the timing, sizing, and choice of supply-demand management actions/upgrades which meet projected water demands. Instead of striving for optimality, the RDM and Info-gap approaches help build plans that are robust to 'deep' uncertainty in future conditions. The MOEO framework considers multiple performance criteria and uses water systems simulators as a function evaluator for the evolutionary algorithm. Visualizations show Pareto approximate tradeoffs between multiple objectives. In this presentation we detail the application of each framework to the Thames basin (including London) water resource planning problem. Supply and demand options are proposed by the major water companies in the basin. We apply the EO method using a 29 year time horizon and an annual time step considering capital, operating (fixed and variable), social and environmental costs. The method considers all plausible combinations of supply and conservation schemes and capacities proposed by water

  18. Improving the current system for supplying organs for transplantation.

    PubMed

    Horton, R L; Horton, P J

    1993-01-01

    The United States currently relies on a voluntary, altruistic system for supplying organs for transplantation. It is now generally recognized that this system, as currently operated, produces a seriously inadequate supply of organs. A number of scholars have argued that some type of (generally unspecified) market system is necessary. Two articles appearing in the Journal of Health Politics, Policy and Law have proposed relatively specific market systems for increasing the supply of organs. In this paper we argue that market systems are at best premature. In particular, there is little to suggest that any type of market system for organs will be permitted in the United States in the foreseeable future. We present data that strongly suggest that the current voluntary, altruistic system has not been developed to its full potential and offer a number of specific suggestions for improving the system.

  19. Electric Transport Traction Power Supply System With Distributed Energy Sources

    NASA Astrophysics Data System (ADS)

    Abramov, E. Y.; Schurov, N. I.; Rozhkova, M. V.

    2016-04-01

    The paper states the problem of traction substation (TSS) leveling of daily-load curve for urban electric transport. The circuit of traction power supply system (TPSS) with distributed autonomous energy source (AES) based on photovoltaic (PV) and energy storage (ES) units is submitted here. The distribution algorithm of power flow for the daily traction load curve leveling is also introduced in this paper. In addition, it illustrates the implemented experiment model of power supply system.

  20. 24 CFR 3280.704 - Fuel supply systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Systems § 3280.704 Fuel supply systems. (a) LP—Gas system design and service line pressure. (1) Systems... container is in service or shall be provided with a suitable internal withdrawal tube which communicates with the vapor space on or near the highest point in the container when it is mounted in...

  1. Multiple fuel supply system for an internal combustion engine

    DOEpatents

    Crothers, William T.

    1977-01-01

    A multiple fuel supply or an internal combustion engine wherein phase separation of components is deliberately induced. The resulting separation permits the use of a single fuel tank to supply components of either or both phases to the engine. Specifically, phase separation of a gasoline/methanol blend is induced by the addition of a minor amount of water sufficient to guarantee separation into an upper gasoline phase and a lower methanol/water phase. A single fuel tank holds the two-phase liquid with separate fuel pickups and separate level indicators for each phase. Either gasoline or methanol, or both, can be supplied to the engine as required by predetermined parameters. A fuel supply system for a phase-separated multiple fuel supply contained in a single fuel tank is described.

  2. Monitoring systems for community water supplies

    NASA Technical Reports Server (NTRS)

    Taylor, R. E.; Brooks, R. R.; Jeffers, E. L.; Linton, A. T.; Poel, G. D.

    1978-01-01

    Water monitoring system includes equipment and techniques for waste water sampling sensors for determining levels of microorganisms, oxygen, chlorine, and many other important parameters. System includes data acquisition and display system that allows computation of water quality information for real time display.

  3. Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed preprocessing supply system designs

    SciTech Connect

    Muth, jr., David J.; Langholtz, Matthew H.; Tan, Eric; Jacobson, Jacob; Schwab, Amy; Wu, May; Argo, Andrew; Brandt, Craig C.; Cafferty, Kara; Chiu, Yi-Wen; Dutta, Abhijit; Eaton, Laurence M.; Searcy, Erin

    2014-03-31

    The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advances in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to the

  4. Development and implementation of water safety plans for small water supplies in Bangladesh: benefits and lessons learned.

    PubMed

    Mahmud, S G; Shamsuddin, Sk Abu Jafar; Ahmed, M Feroze; Davison, Annette; Deere, Dan; Howard, Guy

    2007-12-01

    Water safety plans (WSPs) are promoted by the WHO as the most effective means of securing drinking water safety. To date most experience with WSPs has been within utility supplies, primarily in developed countries. There has been little documented experience of applying WSPs to small community-managed systems, particularly in developing countries. This paper presents a case study from Bangladesh describing how WSPs can be developed and implemented for small systems. Model WSPs were developed through consultation with key water sector practitioners in the country. Simplified tools were developed to translate the formal WSPs into a format that was meaningful and accessible for communities to use. A series of pilot projects were implemented by Non-Governmental Organisations (NGOs) across the country covering all major water supplies. The results show that WSPs can be developed and implemented for small community managed water supplies and improve the sanitary condition and water quality of water sources. Hygiene behaviour improved and household water quality showed a significant reduction in contamination. Chlorination was found to be important for some technologies, thus increasing the costs of water supply and raising important problems with respect to transfer to the communities. Simple tools for community monitoring were found to be effective in supporting better water safety management. PMID:17878569

  5. Potential Impact of the National Plan for Future Electric Power Supply on Air Quality in Korea

    NASA Astrophysics Data System (ADS)

    Shim, C.; Hong, J.

    2014-12-01

    Korean Ministry of Trade, Industry and Energy (MOTIE) announced the national plan for Korea's future electric power supply (2013 - 2027) in 2013. According to the plan, the national demand for electricity will be increased by 60% compared to that of 2010 and primary energy sources for electric generation will still lean on the fossil fuels such as petroleum, LNG, and coal, which would be a potential threat to air quality of Korea. This study focused on two subjects: (1) How the spatial distribution of the primary air pollutant's emissions (i.e., NOx, SOx, CO, PM) will be changed and (2) How the primary emission changes will influence on the national ambient air quality including ozone in 2027. We used GEOS-Chem model simulation with modification of Korean emissions inventory (Clean Air Policy Support System (CAPSS)) to simulate the current and future air quality in Korea. The national total emissions of CO, NOx, SOx, PM in year 2027 will be increased by 3%, 8%, 13%, 2%, respectively compared to 2010 and there are additional concern that the future location of the power plants will be closer to the Seoul Metropolitan Area (SMA), where there are approximately 20 million population vulnerable to the potentially worsened air quality. While there are slight increase of concentration of CO, NOx, SOx, and PM in 2027, the O3 concentration is expected to be similar to the level of 2010. Those results may imply the characteristics of air pollution in East Asia such as potentially severe O3 titration and poorer O3/CO or O3/NOx ratio. Furthermore, we will discuss on the impact of transboundary pollution transport from China in the future, which is one of the large factors to control the air quality of Korea.

  6. Plan of Excellence: IHL System Strategic Plan. A Plan for the Mississippi Public University System.

    ERIC Educational Resources Information Center

    Mississippi State Board of Trustees of State Institutions of Higher Learning, Jackson.

    This guide presents a plan for excellence in education within Mississippi's public university system. It is based on system goals and priorities established by the Board of Trustees of State Institutions of Higher Learning (IHL), and is designed to facilitate planning, budgeting, and decision-making processes at the system and university levels.…

  7. Hybrid supply chain model for material requirement planning under financial constraints: A case study

    NASA Astrophysics Data System (ADS)

    Curci, Vita; Dassisti, Michele; Josefa, Mula Bru; Manuel, Díaz Madroñero

    2014-10-01

    Supply chain model (SCM) are potentially capable to integrate different aspects in supporting decision making for enterprise management tasks. The aim of the paper is to propose an hybrid mathematical programming model for optimization of production requirements resources planning. The preliminary model was conceived bottom-up from a real industrial case analysed oriented to maximize cash flow. Despite the intense computational effort required to converge to a solution, optimisation done brought good result in solving the objective function.

  8. Intelligent process quality control system into supply chain

    NASA Astrophysics Data System (ADS)

    Wang, Shijie; Jiang, Xingyu; Wang, Yingchun

    2010-01-01

    To cope with the challenges of monitoring dynamic and variable quality variation into supply chain, diagnosing the abnormal variation at the right moment, is a difficult problem that a enterprise in supply chain faces in process quality control. An intelligent process quality control mode into supply chain, which integrated quality prevention, analysis, diagnosis and adjustment, and corresponding functional modules and framework were all put forward. This mode dealt mainly with constructing and running intelligent quality control system, such as the theory of similarity manufacturing, Statistical Process Control (SPC), neural network. Furthermore, some key enabling technologies were studied in detail, including process quality analysis on-line based on similarity process and process quality diagnosis based on Elman and expert system of process quality adjustment. It is basis of realizing network, intelligent and automatic process quality control into supply.

  9. Intelligent process quality control system into supply chain

    NASA Astrophysics Data System (ADS)

    Wang, Shijie; Jiang, Xingyu; Wang, Yingchun

    2009-12-01

    To cope with the challenges of monitoring dynamic and variable quality variation into supply chain, diagnosing the abnormal variation at the right moment, is a difficult problem that a enterprise in supply chain faces in process quality control. An intelligent process quality control mode into supply chain, which integrated quality prevention, analysis, diagnosis and adjustment, and corresponding functional modules and framework were all put forward. This mode dealt mainly with constructing and running intelligent quality control system, such as the theory of similarity manufacturing, Statistical Process Control (SPC), neural network. Furthermore, some key enabling technologies were studied in detail, including process quality analysis on-line based on similarity process and process quality diagnosis based on Elman and expert system of process quality adjustment. It is basis of realizing network, intelligent and automatic process quality control into supply.

  10. Planning Istanbul's Public Library System.

    ERIC Educational Resources Information Center

    Dokmeci, Vedia; Korca, Perver

    1992-01-01

    Discussion of the role of public libraries in socioeconomic development focuses on an evaluation of the existing library system in Istanbul (Turkey) and proposes a plan for its balanced development with respect to population distribution and technological advances. Highlights include building design, library automation, and financial…

  11. Algal Supply System Design - Harmonized Version

    SciTech Connect

    Abodeely, Jared; Stevens, Daniel; Ray, Allison; Newby, Deborah; Schaller, Kastli

    2013-03-01

    The objective of this design report is to provide an assessment of current technologies used for production, dewatering, and converting microalgae cultivated in open-pond systems to biofuel. The original draft design was created in 2011 and has subsequently been brought into agreement with the DOE harmonized model. The design report extends beyond this harmonized model to discuss some of the challenges with assessing algal production systems, including the ability to (1) quickly assess alternative algal production system designs, (2) assess spatial and temporal variability, and (3) perform large-scale assessments considering multiple scenarios for thousands of potential sites. The Algae Logistics Model (ALM) was developed to address each of these limitations of current modeling efforts to enable assessment of the economic feasibility of algal production systems across the United States. The (ALM) enables (1) dynamic assessments using spatiotemporal conditions, (2) exploration of algal production system design configurations, (3) investigation of algal production system operating assumptions, and (4) trade-off assessments with technology decisions and operating assumptions. The report discusses results from the ALM, which is used to assess the baseline design determined by harmonization efforts between U.S. DOE national laboratories. Productivity and resource assessment data is provided by coupling the ALM with the Biomass Assessment Tool developed at PNNL. This high-fidelity data is dynamically passed to the ALM and used to help better understand the impacts of spatial and temporal constraints on algal production systems by providing a cost for producing extracted algal lipids annually for each potential site.

  12. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  13. COST FOR WATER SUPPLY DISTRIBUTION SYSTEM REHABILITATION

    EPA Science Inventory

    A major challenge for the society in the twenty-first century will be design, rehabilitation, replacement, and optimal management of drinking water distribution systems. A recent survey conducted by the USEPA found that $138B will be needed to maintain and replace existing drinki...

  14. Analysis of trends in the development of cities' heat supply systems

    NASA Astrophysics Data System (ADS)

    Stennikov, V. A.; Mednikova, E. E.

    2016-09-01

    New challenges—including the modern urban development policy, formation of the market of energy efficient technologies and different types of equipment of a broad power capacity range, tightening requirements to reliability, quality, and economic accessibility of heat supply—enhance the competitiveness of decentralized heat supply. In addition, its spontaneous growth and not always reasonable implementation lead to unjustified expenses, low efficiency, and ecological inconsistency. This proves the relevance of solving the problems of dividing an urban territory into zones of centralized heating (CH) and decentralized heating (DCH) along with their planning and justification, as well as determining a reasonable level of heat supply centralization and concentration of heat sources' power capacity. Solving these problems using the suggested method will allow optimizing the application areas for various types of heat supply and heat sources, justifying the degree of heat power capacity concentration and the extent of the systems as early as at the phase of a detailed urban planning project and then refining them during the design of urban heat supply systems. This will dramatically improve the reasonability of the decisions made and will simplify the procedure of their implementation. For criteria of limiting the extent (radius) of heat supply systems and defining their type, we suggest using standard values—the density of heat load per unit length of the pipeline and per unit area of urban territory. Standard values must be differentiated across the territory of Russia taking into account regional climatic and economic conditions and unique characteristics of heat supply development in cities and towns. The present article continues and develops the statements made in the previous articles created within the framework of the Theory of Hydraulic Circuits and takes into account the current situation and emerging trends in heat supply.

  15. Ligncellulosic feedstock supply systems with intermodal and overseas transportation

    SciTech Connect

    Ric Hoefnagels; Kara Cafferty; Erin Searcy; Jacob J. Jacobson; Martin Junginger; Thijs Cornelissen; Andre Faaij

    2014-12-01

    With growing demand for biomass from industrial uses and international trade, the logistic operations required to economically move the biomass from the field or forest to the end users have become increasingly complex. In addition to economics, understanding energy and GHG emissions is required to design cost effective, sustainable logistic process operations; in order to improve international supply chains it is also important to understate their interdependencies and related uncertainties. This article presents an approach to assess lignocellulosic feedstock supply systems at the operational level. For this purpose, the Biomass Logistic Model (BLM) has been linked with the Geographic Information Systems based Biomass Intermodal Transportation model (BIT-UU) and extended with inter-continental transport routes. Case studies of herbaceous and woody biomass, produced in the U.S. Midwest and U.S. Southeast, respectively, and shipped to Europe for conversion to Fischer-Tropsch (FT) diesel are included to demonstrate how intermodal transportation and, in particular, overseas shipping integrates with the bioenergy supply chains. For the cases demonstrated, biomass can be supplied at 99 € Mg-1 to 117 € Mg-1 (dry) and converted to FT-diesel at 19 € GJ-1 to 24 € GJ-1 depending on the feedstock type and location, intermediate (chips or pellets) and size of the FT-diesel production plant. With the flexibility to change the design of supply chains as well as input variables, many alternative supply chain cases can be assessed.

  16. 40 CFR 792.45 - Test system supply facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Test system supply facilities. 792.45 Section 792.45 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Facilities § 792.45 Test system...

  17. Shuttle cryogenic supply system optimization study. Volume 6: Appendixes

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The optimization of the cryogenic supply system for space shuttles is discussed. The subjects considered are: (1) auxiliary power unit parametric data, (2) propellant acquisition, (3) thermal protection and thermodynamic properties, (4) instrumentation and controls, and (5) initial component redundancy evaluations. Diagrams of the systems are provided. Graphs of the performance capabilities are included.

  18. Demil planning and management system

    SciTech Connect

    Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C.; Golden, R.E.; Fuller, R.

    1997-08-01

    The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

  19. Smart Power Supply for Battery-Powered Systems

    NASA Technical Reports Server (NTRS)

    Krasowski, Michael J.; Greer, Lawrence; Prokop, Norman F.; Flatico, Joseph M.

    2010-01-01

    A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have

  20. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1991-01-01

    The design and functions of ALEPS (Automated Logistics Element Planning System) is a computer system that will automate planning and decision support for Space Station Freedom Logistical Elements (LEs) resupply and return operations. ALEPS provides data management, planning, analysis, monitoring, interfacing, and flight certification for support of LE flight load planning activities. The prototype ALEPS algorithm development is described.

  1. Trading-off tolerable risk with climate change adaptation costs in water supply systems

    NASA Astrophysics Data System (ADS)

    Borgomeo, Edoardo; Mortazavi-Naeini, Mohammad; Hall, Jim W.; O'Sullivan, Michael J.; Watson, Tim

    2016-02-01

    Choosing secure water resource management plans inevitably requires trade-offs between risks (for a variety of stakeholders), costs, and other impacts. We have previously argued that water resources planning should focus upon metrics of risk of water restrictions, accompanied by extensive simulation and scenario-based exploration of uncertainty. However, the results of optimization subject to risk constraints can be sensitive to the specification of tolerable risk, which may not be precisely or consistently defined by different stakeholders. In this paper, we recast the water resources planning problem as a multiobjective optimization problem to identify least cost schemes that satisfy a set of criteria for tolerable risk, where tolerable risk is defined in terms of the frequency of water use restrictions of different levels of severity. Our proposed method links a very large ensemble of climate model projections to a water resource system model and a multiobjective optimization algorithm to identify a Pareto optimal set of water resource management plans across a 25 years planning period. In a case study application to the London water supply system, we identify water resources management plans that, for a given financial cost, maximize performance with respect to one or more probabilistic criteria. This illustrates trade-offs between financial costs of plans and risk, and between risk criteria for four different severities of water use restrictions. Graphical representation of alternative sequences of investments in the Pareto set helps to identify water management options for which there is a robust case for including them in the plan.

  2. A multi-echelon supply chain model for municipal solid waste management system.

    PubMed

    Zhang, Yimei; Huang, Guo He; He, Li

    2014-02-01

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well. PMID:24268473

  3. A multi-echelon supply chain model for municipal solid waste management system.

    PubMed

    Zhang, Yimei; Huang, Guo He; He, Li

    2014-02-01

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.

  4. A multi-echelon supply chain model for municipal solid waste management system

    SciTech Connect

    Zhang, Yimei; Huang, Guo He; He, Li

    2014-02-15

    In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.

  5. 116. PNEUMATIC SUPPLY PANEL IN CENTER OF VEHICLE MECHANICAL SYSTEMS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    116. PNEUMATIC SUPPLY PANEL IN CENTER OF VEHICLE MECHANICAL SYSTEMS ROOM (111) OF LSB (BLDG. 770), FACING NORTH. CONTROLS FOR FLOW AND PRESSURE REGULATION OF NITROGEN ON RIGHT SIDE OF PANEL; CONTROLS FOR HELIUM ON LEFT SIDE OF PANEL (AT LEFT EDGE OF PHOTO). - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 117. PNEUMATIC SUPPLY PANEL IN CENTER OF VEHICLE MECHANICAL SYSTEMS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    117. PNEUMATIC SUPPLY PANEL IN CENTER OF VEHICLE MECHANICAL SYSTEMS ROOM (111), LSB (BLDG. 770), FACING NORTH. CONTROLS FOR FLOW AND PRESSURE REGULATION OF HELIUM ON LEFT SIDE OF PANEL; CONTROLS FOR NITROGEN ON RIGHT SIDE OF PANEL (AT RIGHT EDGE OF PHOTO). - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 78 FR 36278 - Fuel Oil Systems for Emergency Power Supplies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... Draft Regulatory Guide, DG-1282 on July 5, 2012 (77 FR 39745) for a 60-day public comment period. The public comment period was extended until September 28, 2012 (77 FR 48177). Public comments were received... COMMISSION Fuel Oil Systems for Emergency Power Supplies AGENCY: Nuclear Regulatory Commission....

  8. Collaborative Learning in Advanced Supply Systems: The KLASS Pilot Project.

    ERIC Educational Resources Information Center

    Rhodes, Ed; Carter, Ruth

    2003-01-01

    The Knowledge and Learning in Advanced Supply Systems (KLASS) project developed collaborative learning networks of suppliers in the British automotive and aerospace industries. Methods included face-to-face and distance learning, work toward National Vocational Qualifications, and diagnostic workshops for senior managers on improving quality,…

  9. The power supply system of the CLEO III silicon detector

    NASA Astrophysics Data System (ADS)

    von Toerne, E.; Burns, J.; Duboscq, J.; Eckhart, E.; Honscheid, K.; Kagan, H.; Kass, R.; Larsen, D.; Rush, C.; Smith, S.; Thayer, J. B.

    2002-04-01

    The CLEO III detector has recently commenced data taking at the Cornell Electron Storage Ring (CESR). One important component of this detector is a four layer double-sided silicon tracker with 93% solid angle coverage. This detector ranges in size and number of readout channels between the LEP and LHC silicon detectors. In order to reach the detector performance goals of signal-to-noise ratios greater than 15 : 1 low noise front-end electronics together with highly regulated low noise power supplies were used. In this paper, we describe the low-noise power supply system and associated monitoring and safety features used by the CLEO III silicon tracker.

  10. A number of upgrades on RHIC power supply system

    SciTech Connect

    Mi, C.; Bruno, D.; Drozd, J.; Nolan, T.; Orsatti, F.; Heppener, G.; Di Lieto, A.; Schultheiss, C.; Samms, T.; Zapasek, R.; Sandberg, J.

    2015-05-03

    This year marks the 15th run for the Relativistic Heavy Ion Collider (RHIC). Operation of a reliable superconducting magnet power supply system is a key factor of an accelerator’s performance. Over the past 15 years, the RHIC power supply group has made many improvements to increase the machine availability and reduce failures. During these past 15 years of operating RHIC a lot of problems have been solved or addressed. In this paper some of the essential upgrades/improvements are discussed.

  11. Manned orbital systems concepts study. Book 3: Configurations for extended duration missions. [mission planning and project planning for space missions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.

  12. Site systems engineering: Systems engineering management plan

    SciTech Connect

    Grygiel, M.L.

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  13. Feedstock and Conversion Supply System Design and Analysis

    SciTech Connect

    J. Jacobson; R. Mohammad; K. Cafferty; K. Kenney; E. Searcy; J. Hansen

    2014-09-01

    The success of the earlier logistic pathway designs (Biochemical and Thermochemical) from a feedstock perspective was that it demonstrated that through proper equipment selection and best management practices, conventional supply systems (referred to in this report as “conventional designs,” or specifically the 2012 Conventional Design) can be successfully implemented to address dry matter loss, quality issues, and enable feedstock cost reductions that help to reduce feedstock risk of variable supply and quality and enable industry to commercialize biomass feedstock supply chains. The caveat of this success is that conventional designs depend on high density, low-cost biomass with no disruption from incremental weather. In this respect, the success of conventional designs is tied to specific, highly productive regions such as the southeastern U.S. which has traditionally supported numerous pulp and paper industries or the Midwest U.S for corn stover.

  14. Remote Excavation System test plan

    SciTech Connect

    Walker, S.; Hyde, R.A.

    1993-05-01

    The Office of Technology Development (OTD) established the Robotics Technology Development Program (RTDP) to integrate robotic development activities on a national basis; provide needs-oriented, timely, and economical robotics technology to support environmental and waste operations activities at Department of Energy (DOE) sites; and provide the focus and direction for the near term (less than five years) and guidance for the tong-term (five to twenty years) research and development efforts for site-specific problems. The RTDP consists of several programs including the Buried Waste Robotics Program (BWRP), which addresses remote buried waste applications. The Remote Excavation System (RES) was developed under the RTDP to provide a safer method of excavating hazardous materials for both the DOE and the Department of Defense (DOD). The excavator, initially developed by the DOD as a manually-operated small excavator, has been modified for teleoperation with joint funding from the BWRP and the DOD. The Buried Waste Integrated Demonstration (BWID) and the Uranium Soils Integrated Demonstration (USID) are funding the demonstration, testing, and evaluation of the RES covered in this test plan. This document covers testing both at Oak Ridge National Laboratory (ORNL) and the Idaho National Engineering Laboratory (INEL), as funded by BWID and USID. This document describes the tests planned for the RES demonstration for the BWRP. The purposes of the test plan are (1) to establish test parameters to ensure that the demonstration results are deemed useful and usable and (2) to demonstrate performance in a safe manner within all regulatory requirements.

  15. Methods of Assessing the Risks Associated with Lack of Water Supplies, Water Safety Plan for National Conditions

    NASA Astrophysics Data System (ADS)

    Rybka, Sławomir

    2012-06-01

    Article shows the desire to obtain risk-control options, and bringing it to a tolerable level. Subjects were ways of managing and dealing with risk. Methods of dealing with aspects of the protection of industrial buildings and high-risk critical infrastructure vulnerability analysis methodology to the loss of integrity. Also a set method to deal with aspects of the protection of industrial buildings and high-risk critical infrastructure that is the analysis of susceptibility to loss of integrity. The article also presents the basic principles of water safety plan based on national and foreign research publications. In the next part of article WSP methodology was concluded, outlining the actions which use significantly reduces the risk of threats that could lead to supply of contaminated tap water or total interruption of its supply. In further considerations the most important steps in creating WSP were presented. In the final section the principle of modular computer system operation that is used for network management for urban water supply in Rzeszow was presented.

  16. CLASSIFICATION OF THE MGR MAINTENANCE AND SUPPLY SYSTEM

    SciTech Connect

    J.A. Ziegler

    1999-08-31

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) maintenance and supply system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998).

  17. Operation and control of a water supply system.

    PubMed

    Eker, Ilyas; Kara, Tolgay

    2003-07-01

    The control of water supply systems is becoming more important, since there are increasing requirements to improve operation. A need exists to model and simulate water supply systems so that their behavior can be fully understood and the total process optimized. This paper describes the simulation and control of a water supply system consisting of a sequence of pumping stations that deliver water through pipelines to intermediate storage reservoirs. The system is represented by dominant system variables that represent active and passive dynamical elements. The hydraulic models include the nonlinear coupling between flow rates and reservoir heads. The bisection numerical solution approach is used to obtain a roughness dependent friction coefficient. The whole system is simulated and the results are presented and compared with the real-time measured data. A water level controller using the robust polynomial H(infinity) optimization method by manipulating pump speed is obtained. The stochastic nature of the disturbance and loads is considered for controller design. The parametrized dynamic weighting functions of the design theory are selected to achieve the required control functions and robustness.

  18. A System for Planning Ahead

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  19. Conceptual design and analysis of orbital cryogenic liquid storage and supply systems

    NASA Technical Reports Server (NTRS)

    Eberhardt, R. N.; Cunnington, G. R.; Johns, W. A.

    1981-01-01

    A wide variety of orbital cryogenic liquid storage and supply systems are defined in NASA and DOD long-range plans. These systems include small cooling applications, large chemical and electrical orbit transfer vehicles and supply tankers. All have the common requirements of low-g fluid management to accomplish gas-free liquid expulsion and efficient thermal control to manage heat leak and tank pressure. A preliminary design study was performed to evaluate tanks ranging from 0.6 to 37.4 cu m (22 to 1320 cu ft). Liquids of interest were hydrogen, oxygen, methane, argon and helium. Conceptual designs were generated for each tank system and fluid dynamic, thermal and structural analyses were performed for Shuttle compatible operations. Design trades considered the paradox of conservative support structure and minimum thermal input. Orbital performance and weight data were developed, and a technology evaluation was completed.

  20. New problem with sales, inventories, and operations planning in a supply chain environment

    NASA Astrophysics Data System (ADS)

    Thomas, Andre; Lamouri, Samir

    2000-10-01

    The highest level of planning and control system is necessary, because production and logistics systems are not so flexible to follow, from day to day, sales evolutions. The companies are therefore held to standardize the good practices concerning the elaboration of their Sales, Inventories and Operations Planning (SIOP). The SIOP makes it possible to implement the strategic objectives defined by Top Management at the time of the Business Plan. It is the link between sales and manufacturing planning. The objectives of each of those depend on the specificity of their trade: the Sales Department will go for a maximum sales whereas Production will endeavor to keep industrial cost prices as low as possible while the Finance Department will try to optimize the use of available funds. There are several tools for this optimization: Graphical method and linear programming. Today, the economic context requires robust optimization.

  1. Power supply system for negative ion source at IPR

    NASA Astrophysics Data System (ADS)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K. G.; Soni, Jignesh; Bandyopadhyay, M.; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-02-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ~5 × 1012 cm-3, from which ~ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (~15 to 35kV), and high current (~ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (~50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (~ 50kV) isolated from the system. The paper shall present the

  2. Vulnerability Assessment of Water Supply Systems: Status, Gaps and Opportunities

    NASA Astrophysics Data System (ADS)

    Wheater, H. S.

    2015-12-01

    Conventional frameworks for assessing the impacts of climate change on water resource systems use cascades of climate and hydrological models to provide 'top-down' projections of future water availability, but these are subject to high uncertainty and are model and scenario-specific. Hence there has been recent interest in 'bottom-up' frameworks, which aim to evaluate system vulnerability to change in the context of possible future climate and/or hydrological conditions. Such vulnerability assessments are generic, and can be combined with updated information from top-down assessments as they become available. While some vulnerability methods use hydrological models to estimate water availability, fully bottom-up schemes have recently been proposed that directly map system vulnerability as a function of feasible changes in water supply characteristics. These use stochastic algorithms, based on reconstruction or reshuffling methods, by which multiple water supply realizations can be generated under feasible ranges of change in water supply conditions. The paper reports recent successes, and points to areas of future improvement. Advances in stochastic modeling and optimization can address some technical limitations in flow reconstruction, while various data mining and system identification techniques can provide possibilities to better condition realizations for consistency with top-down scenarios. Finally, we show that probabilistic and Bayesian frameworks together can provide a potential basis to combine information obtained from fully bottom-up analyses with projections available from climate and/or hydrological models in a fully integrated risk assessment framework for deep uncertainty.

  3. Evaluation of neighborhood treatment systems for potable water supply.

    PubMed

    Corella-Barud, Veronica; Mena, Kristina D; Gibbs, Shawn G; Gurian, Patrick L; Barud, Alberto

    2009-02-01

    Piped water is available in Ciudad Juarez, Chihuahua, Mexico, but residual disinfectant is not reliably found in the public drinking water supply. Lack of confidence in the public supply leads many residents to rely on bottled water. To provide consistent disinfection, two health clinics were equipped with ultraviolet disinfection systems, and neighboring households were encouraged to obtain their drinking water from the treatment systems. Use of the treated water declined from 62% of self-selected study participants at the time of the first visit to 40% at the second visit. During the first visit, diarrhea prevalence was similar among households using treated water and other water sources yet diarrhea prevalence was higher among households using the treated water during the second visit. Microbiological quality of the treated water in the homes was not demonstrably superior to that of other sources.

  4. A study of industrial hydrogen and syngas supply systems

    NASA Technical Reports Server (NTRS)

    Amos, W. J.; Solomon, J.; Eliezer, K. F.

    1979-01-01

    The potential and incentives required for supplying hydrogen and syngas feedstocks to the U.S. chemical industry from coal gasification systems were evaluated. Future hydrogen and syngas demand for chemical manufacture was estimated by geographic area and projected economics for hydrogen and syngas manufacture was estimated with geographic area of manufacture and plant size as parameters. Natural gas, oil and coal feedstocks were considered. Problem areas presently affecting the commercial feasibility of coal gasification discussed include the impact of potential process improvements, factors involved in financing coal gasification plants, regulatory barriers affecting coal gasification, coal mining/transportation, air quality regulations, and competitive feedstock pricing barriers. The potential for making coal gasification the least costly H2 and syngas supply option. Options to stimulate coal gasification system development are discussed.

  5. NASCOM system development plan: System description, capabilities, and plans, FY 94-2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

  6. HLW system plan - revision 2

    SciTech Connect

    Not Available

    1994-01-14

    The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources from within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.

  7. Business System Planning Project System Requirements Specification

    SciTech Connect

    NELSON, R.E.

    2000-09-08

    The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

  8. Supply of reactants for Redox bulk energy storage systems

    NASA Technical Reports Server (NTRS)

    Gahn, R. F.

    1978-01-01

    World resources, reserves, production, and costs of reactant materials, iron, chromium, titanium and bromine for proposed redox cell bulk energy storage systems are reviewed. Supplying required materials for multimegawatt hour systems appears to be feasible even at current production levels. Iron and chromium ores are the most abundant and lowest cost of four reactants. Chromium is not a domestic reserve, but redox system installations would represent a small fraction of U.S. imports. Vast quantities of bromine are available, but present production is low and therefore cost is high. Titanium is currently available at reasonable cost, with ample reserves available for the next fifty years.

  9. Nitrogen Gas Heating and Supply System for SST-1 Tokamak

    NASA Astrophysics Data System (ADS)

    Ziauddin, Khan; Firozkhan, Pathan; Yuvakiran, Paravastu; Siju, George; Gattu, Ramesh; Hima, Bindu; Dilip, C. Raval; Prashant, Thankey; Kalpesh, Dhanani; Subrata, Pradhan

    2013-02-01

    Steady State Tokamak (SST-1) vacuum vessel baking as well as baking of the first wall components of SST-1 are essential to plasma physics experiments. Under a refurbishment spectrum of SST-1, the nitrogen gas heating and supply system has been fully refurbished. The SST-1 vacuum vessel consists of ultra-high vacuum (UHV) compatible eight modules and eight sectors. Rectangular baking channels are embedded on each of them. Similarly, the SST-1 plasma facing components (PFC) are comprised of modular graphite diverters and movable graphite based limiters. The nitrogen gas heating and supply system would bake the plasma facing components at 350°C and the SST-1 vacuum vessel at 150°C over an extended duration so as to remove water vapour and other absorbed gases. An efficient PLC based baking facility has been developed and implemented for monitoring and control purposes. This paper presents functional and operational aspects of a SST-1 nitrogen gas heating and supply system. Some of the experimental results obtained during the baking of SST-1 vacuum modules and sectors are also presented here.

  10. Model simulation of the Manasquan water-supply system in Monmouth County, New Jersey

    USGS Publications Warehouse

    Chang, Ming; Tasker, Gary D.; Nieswand, Steven

    2001-01-01

    Model simulation of the Manasquan Water Supply System in Monmouth County, New Jersey, was completed using historic hydrologic data to evaluate the effects of operational and withdrawal alternatives on the Manasquan reservoir and pumping system. Changes in the system operations can be simulated with the model using precipitation forecasts. The Manasquan Reservoir system model operates by using daily streamflow values, which were reconstructed from historical U.S. Geological Survey streamflow-gaging station records. The model is able to run in two modes--General Risk analysis Model (GRAM) and Position Analysis Model (POSA). The GRAM simulation procedure uses reconstructed historical streamflow records to provide probability estimates of certain events, such as reservoir storage levels declining below a specific level, when given an assumed set of operating rules and withdrawal rates. POSA can be used to forecast the likelihood of specified outcomes, such as streamflows falling below statutory passing flows, associated with a specific working plan for the water-supply system over a period of months. The user can manipulate the model and generate graphs and tables of streamflows and storage, for example. This model can be used as a management tool to facilitate the development of drought warning and drought emergency rule curves and safe yield values for the water-supply system.

  11. Using integrated information systems in supply chain management

    NASA Astrophysics Data System (ADS)

    Gonzálvez-Gallego, Nicolás; Molina-Castillo, Francisco-Jose; Soto-Acosta, Pedro; Varajao, Joao; Trigo, Antonio

    2015-02-01

    The aim of this paper is to empirically test not only the direct effects of information and communication technology (ICT) capabilities and integrated information systems (IS) on firm performance, but also the moderating role of IS integration along the supply chain in the relationship between ICT external and capabilities and business performance. Data collected from 102 large Iberian firms from Spain and Portugal are used to test the research model. The hierarchical multiple regression analysis is employed to test the direct effects and the moderating relationships proposed. Results show that external and internal ICT capabilities are important drivers of firm performance, while merely having integrated IS do not lead to better firm performance. In addition, a moderating effect of IS integration in the relationship between ICT capabilities and business performance is found, although this integration only contributes to firm performance when it is directed to connect with suppliers or customers rather than when integrating the whole supply chain.

  12. Rural water-supply and sanitation planning: The use of socioeconomic preconditions in project identification

    NASA Astrophysics Data System (ADS)

    Warner, Dennis B.

    1984-02-01

    Recognition of the socioeconomic preconditions for successful rural water-supply and sanitation projects in developing countries is the key to identifying a new project. Preconditions are the social, economic and technical characteristics defining the project environment. There are two basic types of preconditions: those existing at the time of the initial investigation and those induced by subsequent project activities. Successful project identification is dependent upon an accurate recognition of existing constraints and a carefully tailored package of complementary investments intended to overcome the constraints. This paper discusses the socioeconomic aspects of preconditions in the context of a five-step procedure for project identification. The procedure includes: (1) problem identification; (2) determination of socioeconomic status; (3) technology selection; (4) utilization of support conditions; and (5) benefit estimation. Although the establishment of specific preconditions should be based upon the types of projects likely to be implemented, the paper outlines a number of general relationships regarding favourable preconditions in water and sanitation planning. These relationships are used within the above five-step procedure to develop a set of general guidelines for the application of preconditions in the identification of rural water-supply and sanitation projects.

  13. Assessing the Vulnerability of Public-Supply Wells to Contamination: Floridan Aquifer System Near Tampa, Florida

    USGS Publications Warehouse

    Jagucki, Martha L.; Katz, Brian G.; Crandall, Christy A.; Eberts, Sandra M.

    2009-01-01

    radon that occurs when water from the surficial aquifer flows downward through the confining unit and then through the Upper Floridan aquifer matrix. Roughly 50 percent of the simulated flow to the public-supply well consists of water less than about 10 years old, thus making the well vulnerable to contamination from human activities. Sampling at various depths in the public-supply well during pumping and nonpumping conditions showed that water entering the well from the cavernous zone had much higher arsenic concentrations during pumping conditions (18.9 ug/L) than during nonpumping conditions (4.2 ug/L). This implies that movement of arsenic to the public-supply well from the cavernous zone is enhanced by pumping. One possible explanation is that pumping increases the movement of water with elevated dissolved oxygen content through the cavernous zone, which causes dissolution of arsenic associated with pyrite. All public-supply wells in the area may not have the same level of vulnerability as the well studied - many of the public-supply wells in the region have lower pumping rates and longer open intervals that may draw in a larger proportion of old water that predates anthropogenic influences. Determining the similarity of water produced by various public-supply wells in the region to that of the surficial aquifer system is one measure of well vulnerability that could be used to prioritize monitoring and land-use planning efforts to protect the most vulnerable wells.

  14. Integrated planning problem in supply chains with time-varying delivery

    NASA Astrophysics Data System (ADS)

    Wang, Hai-ying; Liu, Da-cheng; Ding, Hua; Guo, Fu

    2011-10-01

    We consider a serial supply chain consisting of a raw material supplier, a manufacturer, a distribution centre and a retailer in the presence of time-varying delivery between manufacturer facility and the retailer warehouse. Delivery time functions are developed based on practical data analysis and the cost models for both linear and non-linear delivery time functions are derived. Analytic solution for system with linear delivery times is derived and a search algorithm for system with non-linear delivery times is established. Finally, sensitivity analysis is made to help decision makers achieve a lower total cost in practice.

  15. A science plan for a comprehensive assessment of water supply in the region underlain by fractured rock in Maryland

    USGS Publications Warehouse

    Fleming, Brandon J.; Hammond, Patrick A.; Stranko, Scott A.; Duigon, Mark T.; Kasraei, Saeid

    2012-01-01

    The fractured rock region of Maryland, which includes land areas north and west of the Interstate 95 corridor, is the source of water supply for approximately 4.4 million Marylanders, or approximately 76 percent of the State's population. Whereas hundreds of thousands of residents rely on wells (both domestic and community), millions rely on surface-water sources. In this region, land use, geology, topography, water withdrawals, impoundments, and other factors affect water-flow characteristics. The unconfined groundwater systems are closely interconnected with rivers and streams, and are affected by seasonal and climatic variations. During droughts, groundwater levels drop, thereby decreasing well yields, and in some cases, wells have gone dry. Low ground-water levels contribute to reduced streamflows, which in turn, can lead to reduced habitat for aquatic life. Increased demand, over-allocation, population growth, and climate change can affect the future sustainability of water supplies in the region of Maryland underlain by fractured rock. In response to recommendations of the 2008 Advisory Committee on the Management and Protection of the State's Water Resources report, the Maryland Department of the Environment's Water Supply Program, the Maryland Geological Survey, the Maryland Department of Natural Resources, Monitoring and Non-Tidal Assessment (MANTA) Division, and the U.S. Geological Survey have developed a science plan for a comprehensive assessment that will provide new scientific information, new data analysis, and new tools for the State to better manage water resources in the fractured rock region of Maryland. The science plan lays out five goals for the comprehensive assessment: (1) develop tools for the improved management and investigation of groundwater and surface-water resources; (2) characterize factors affecting reliable yields of individual groundwater and surface-water supplies; (3) investigate impacts on nearby water withdrawal users caused

  16. Performance of constructed wetland system for public water supply.

    PubMed

    Elias, J M; Salati Filho, E; Salati, E

    2001-01-01

    The project is being conducted in the town of Analândia, São Paulo, Brazil. The constructed wetlands system for water supply consists of a channel with floating aquatic macrophytes, HDS system (Water Decontamination with Soil-Patent PI 850.3030), chlorinating system, filtering system and distribution. The project objectives include investigating the process variables to further optimize design and operation factors, evaluating the relation of nutrients and plants development, biomass production, shoot development, nutrient cycling and total and fecal coliforms removal, comparing the treatment efficiency among the seasons of the year; and moreover to compare the average values obtained between February and June 1998 (Salati et al., 1998) with the average obtained for the same parameters between March and June 2000. Studies have been developed in order to verify during one year the drinking quality of the water for the following parameters: turbidity, color, pH, dissolved oxygen, total of dissolved solids, COD, chloride, among others, according to the Ministry of Health's Regulation 36. This system of water supply projected to treat 15 L s(-1) has been in continuous operation for 2 years, it was implemented with support of the National Environment Fund (FNMA), administered by the Center of Environmental Studies (CEA-UNESP), while the technical supervision and design were performed by the Institute of Applied Ecology. The actual research project is being supported by FAPESP.

  17. Quality assurance plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project

    SciTech Connect

    Stewart, K.A.; Rasch, K.A.; Reid, R.W.

    1996-11-01

    This document establishes the Quality Assurance Plan (QAP) for the National Guard Bureau Objective Supply Capability Adaptive Redesign (OSCAR) project activities under the Oak Ridge National Laboratory (ORNL) management. It defines the requirements and assigns responsibilities for ensuring, with a high degree of confidence, that project objectives will be achieved as planned. The QAP outlined herein is responsive to and meets the Quality Assurance Program standards for the U.S. Department of Energy (DOE), Lockheed Martin Energy Research Corporation and ORNL and the ORNL Computing, Robotics, and Education Directorate (CRE). This document is intended to be in compliance with DOE Order 5700.6C, Quality Assurance Program, and the ORNL Standard Practice Procedure, SPP X-QA-8, Quality Assurance for ORNL Computing Software. This standard allows individual organizations to apply the stated requirements in a flexible manner suitable to the type of activity involved. Section I of this document provides an introduction to the OSCAR project QAP; Sections 2 and 3 describe the specific aspects of quality assurance as applicable to the OSCAR project. Section 4 describes the project approach to risk management. The Risk Management Matrix given in Appendix A is a tool to assess, prioritize, and prevent problems before they occur. Therefore, the matrix will be reviewed and revised on a periodic basis.

  18. Alignment of Information Systems with Supply Chains: Impacts on Supply Chain Performance and Organizational Performance

    ERIC Educational Resources Information Center

    Qrunfleh, Sufian M.

    2010-01-01

    Over the past decade, an important focus of researchers has been on supply chain management (SCM), as many organizations believe that effective SCM is the key to building and sustaining competitive advantage for their products/services. To manage the supply chain, companies need to adopt an SCM strategy (SCMS) and implement appropriate SCM…

  19. Forecast-Based Operations Support Tool for the New York City Water Supply System

    NASA Astrophysics Data System (ADS)

    Pyke, G.; Porter, J.

    2012-12-01

    The NYC water supply system serves 9 million people with over 1 BGD of water drawn from 19 reservoirs. To support operation of the system to meet multiple objectives (e.g. supply reliability, water quality, environmental releases, hydropower, peak flow mitigation), the New York City Department of Environmental Protection (DEP) is developing an Operations Support Tool (OST), a forecast-based decision support system that provides a probabilistic foundation for water supply operations and planning. Key features of OST include: the ability to run both long-term simulations and short-term probabilistic simulations on the same model platform; automated processing of near-real-time (NRT) data sources; use of inflow forecasts to support look-ahead operational simulations; and water supply-water quality model linkage to account for feedback and tradeoffs between supply and quality objectives. OST supports two types of simulations. Long-term runs execute the system model over an extended historical record and are used to evaluate reservoir operating rules, infrastructure modifications, and climate change scenarios (with inflows derived from downscaled GCM data). Short-term runs for operational guidance consist of multiple (e.g. 80+) short (e.g. one year) runs, all starting from the same initial conditions (typically those of the current day). Ensemble reservoir inflow forecast traces are used to drive the model for the duration of the simulation period. The result of these runs is a distribution of potential future system states. DEP managers analyze the distributions for alternate scenarios and make operations decisions using risk-based metrics such as probability of refill or the likelihood of a water quality event. For operational simulations, the OST data system acquires NRT data from DEP internal sources (SCADA operations data, keypoint water quality, in-stream/in-reservoir water quality, meteorological and snowpack monitoring sites). OST acquires streamflow data from

  20. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  1. Reconstitution planning: SPC final report 1424. [System Planning Corporation (SPC)

    SciTech Connect

    Not Available

    1992-06-01

    The Office of the Deputy Under Secretary of Defense for Policy ODUSD(P) tasked the University of California's Los Alamos National Laboratory (LANL) to conduct a study to determine and assess the requirements and options for maintaining and developing a flexible and sustainable reconstitution base over the long term. In support of that study effort, System Planning Corporation (SPC) working closely with ODUSD(P) staff, developed and demonstrated an analytic process for conducting DoD reconstitution planning analyses on a regular basis and as part of the DoD PPBS. Within ODUSD(P), this planning approach is often referred to generically as a capacity-driven'' planning approach. Under the SPC-developed planning approach, DoD components would develop and maintain a family of reconstitution plans organized hierarchically on the basis of broad equipment categories (i.e., aircraft, ships, tracked combat vehicles, missiles and space, and munitions). For each selected broad equipment category, the cognizant DoD component will develop a reconstitution planning document that addresses a 20-year planning horizon. The analytic process to be used in support of activation scheduling would consist of the following activities; Defining appropriate demand schedule(s) for providing reconstitution response options; Identifying a menu of programmatic options for satisfying the above demand schedule; Conducting sensitivity and cost analyses; Selecting a set of reconstitution program options; Integrating and summarizing in a comprehensive, Department-wide manner reconstitution program options for all reconstitution plans; Developing and issuing planning guidance to DoD components; Estimating and projecting needed budgetary resources; Defending selected reconstitution programs throughout the PPBS process and Congressional budget process.

  2. Instructor's Plan: A Lesson Planning Expert System for School Teachers.

    ERIC Educational Resources Information Center

    Wilkins, Dennis A.; And Others

    The product of several years of research and development at Brigham Young University, Instructor's Plan (IP) is an expert system for rapid lesson design and authoring. Its primary audience is preservice and inservice school teachers. It will run on IBM PC, XT, AT, and PS/2 systems and compatibles with a color monitor and at least one floppy disk…

  3. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  4. Shuttle Orbiter medical system equipment/supplies evaluation

    NASA Technical Reports Server (NTRS)

    Maidlow, Kristin; Schulz, John M.; Lloyd, Charles W.; Breeding, Tiffany

    1991-01-01

    The effectivity was evaluated in zero gravity of several medical equipment and supply items flown in the Shuttle Orbiter Medical System (SOMS). Several procedures listed in Medical Operations Medical Checklist, JSC 1732 were also evaluated. Several items were drawn out of the kits and tested on the KC-135. In two different flights, the following elements were examined: (1) measuring IV flow (drip chamber, one way flow valve, and air/fluid separator); (2) chemstrip protocol for urine analysis in zero-gravity; and (3) tamper resistant seals for injectable medications.

  5. Fuel Costs, Propulsion Systems and Interplanetary Supply Chains

    NASA Astrophysics Data System (ADS)

    Smith, R.

    A perspective on the economics of space logistics in a future state where there are continuous supply routes between Earth and outlying bodies in the solar system is discussed. In particular, the dependence of the cost of transport on specific impulse and % of non-fuel mass as cargo is discussed. Also, a simple way to calculate the optimal cargo mass of a transport ship carrying a commodity with constant demand is proposed as well as qualitative issues regarding backhaul and inventory that space logistics planners will have to one day confront.

  6. Space shuttle electrical power generation and reactant supply system

    NASA Technical Reports Server (NTRS)

    Simon, W. E.

    1985-01-01

    The design philosophy and development experience of fuel cell power generation and cryogenic reactant supply systems are reviewed, beginning with the state of technology at the conclusion of the Apollo Program. Technology advancements span a period of 10 years from initial definition phase to the most recent space transportation system (STS) flights. The development program encompassed prototype, verification, and qualification hardware, as well as post-STS-1 design improvements. Focus is on the problems encountered, the scientific and engineering approaches employed to meet the technological challenges, and the results obtained. Major technology barriers are discussed, and the evolving technology development paths are traced from their conceptual beginnings to the fully man-rated systems which are now an integral part of the shuttle vehicle.

  7. Configuration complexity assessment of convergent supply chain systems

    NASA Astrophysics Data System (ADS)

    Modrak, Vladimir; Marton, David

    2014-07-01

    System designers usually generate alternative configurations of supply chains (SCs) by varying especially fixed assets to satisfy a desired production scope and rate. Such alternatives often vary in associated costs and other facets including degrees of complexity. Hence, a measure of configuration complexity can be a tool for comparison and decision-making. This paper presents three approaches to assessment of configuration complexity and their applications to designing convergent SC systems. Presented approaches are conceptually distinct ways of measuring structural complexity parameters based on different preconditions and circumstances of assembly systems which are typical representatives of convergent SCs. There are applied two similar approaches based on different preconditions that are related to demand shares. Third approach does not consider any special condition relating to character of final product demand. Subsequently, we propose a framework for modeling of assembly SC models, which are dividing to classes.

  8. A Demand-Driven Approach for a Multi-Agent System in Supply Chain Management

    NASA Astrophysics Data System (ADS)

    Kovalchuk, Yevgeniya; Fasli, Maria

    This paper presents the architecture of a multi-agent decision support system for Supply Chain Management (SCM) which has been designed to compete in the TAC SCM game. The behaviour of the system is demand-driven and the agents plan, predict, and react dynamically to changes in the market. The main strength of the system lies in the ability of the Demand agent to predict customer winning bid prices - the highest prices the agent can offer customers and still obtain their orders. This paper investigates the effect of the ability to predict customer order prices on the overall performance of the system. Four strategies are proposed and compared for predicting such prices. The experimental results reveal which strategies are better and show that there is a correlation between the accuracy of the models' predictions and the overall system performance: the more accurate the prediction of customer order prices, the higher the profit.

  9. School Planning, Evaluation and Communication System (SPECS).

    ERIC Educational Resources Information Center

    Flocco, Edward C.

    A comprehensive school planning tool is available from General Learning Corporation and the Center for the Advanced Study of Educational Administration at the University of Oregon. This School Planning, Evaluation and Communication System (SPECS) provides a deliverable system of training, implementation strategies and materials and technical…

  10. Harnessing the Risk-Related Data Supply Chain: An Information Architecture Approach to Enriching Human System Research and Operations Knowledge

    NASA Technical Reports Server (NTRS)

    Buquo, Lynn E.; Johnson-Throop, Kathy A.

    2011-01-01

    An Information Architecture facilitates the understanding and, hence, harnessing of the human system risk-related data supply chain which enhances the ability to securely collect, integrate, and share data assets that improve human system research and operations. By mapping the risk-related data flow from raw data to useable information and knowledge (think of it as a data supply chain), the Human Research Program (HRP) and Space Life Science Directorate (SLSD) are building an information architecture plan to leverage their existing, and often shared, IT infrastructure.

  11. Mountain Plains Learning Experience Guide: Plumbing. Course: Supply Piping Systems.

    ERIC Educational Resources Information Center

    Arneson, R.; And Others

    One of three individualized courses included in a plumbing curriculum, this course covers installing, servicing, and repairing supply lines and fixtures commonly found in residential/commercial structures. The course is comprised of four units: (1) Pipe and Fittings, (2) Cold Water Supply, (3) Hot Water Supply, and (4) Fixtures. Each unit begins…

  12. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  13. Possibilities of utilizing alternative energy sources for combined heat supply systems in the Baltic

    SciTech Connect

    Shipkovs, P.; Grislis, V.; Zebergs, V. )

    1991-01-01

    The problem of alternative energy sources is an issue of major importance for the Baltic republics because of the limited supply of conventional energy resources. One of the ways to solve this problem could be the introduction of combined heat supply systems (CHSS). The combined heat supply systems are such systems where various energy sources in different regimes are made use of to ensure the optimum temperature on residential and industrial premises. The influence of climatic conditions on the selection of heat supply systems has been studied at large. In the present paper the use of alternative energy sources (AES) in combined heat supply systems (CHSS) is described.

  14. Enroute flight planning: The design of cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, Elaine

    1990-01-01

    Design concepts and principles to guide in the building of cooperative problem solving systems are being developed and evaluated. In particular, the design of cooperative systems for enroute flight planning is being studied. The investigation involves a three stage process, modeling human performance in existing environments, building cognitive artifacts, and studying the performance of people working in collaboration with these artifacts. The most significant design concepts and principles identified thus far are the principle focus.

  15. [Central sterile supply department management system design and implementation based on RFID technology].

    PubMed

    Li, Lei

    2012-03-01

    With the analysis of the requirements of sterilization and supply center of hospital(referred to as "supply room"), the management system of supply room was developed and integrated into the RFID technology. The?system has achieve disinfection materials circulation process traceability to improve the quality management of disinfection materials and reduce the management costs.

  16. [Central sterile supply department management system design and implementation based on RFID technology].

    PubMed

    Li, Lei

    2012-03-01

    With the analysis of the requirements of sterilization and supply center of hospital(referred to as "supply room"), the management system of supply room was developed and integrated into the RFID technology. The?system has achieve disinfection materials circulation process traceability to improve the quality management of disinfection materials and reduce the management costs. PMID:22737889

  17. The Archimedes 2 mechanical assembly planning system

    SciTech Connect

    Kaufman, S.G.; Wilson, R.H.; Jones, R.E.; Calton, T.L.; Ames, A.L.

    1996-03-01

    We describe the implementation and performance of Archimedes 2, an integrated mechanical assembly planning system. Archimedes 2 includes two planners, two assembly sequence animation facilities, and an associated robotic workcell. Both planners use full 3 dimensional data. A rudimentary translator from high level assembly plans to control code for the robotic workcell has also been implemented. We can translate data from a commercial CAD system into input data for the system, which has allowed us to plan assembly sequences for many industrial assemblies. Archimedes 2 has been used to plan sequences for assemblies consisting of 5 to 109 parts. We have also successfully taken a CAD model of an assembly, produced an optimized assembly sequence for it, and translated the plan into robot code, which successfully assembles the device specified in the model.

  18. Fuel cell and system for supplying electrolyte thereto

    DOEpatents

    Adlhart, Otto J.; Feigenbaum, Haim

    1984-01-01

    An electrolyte distribution and supply system for use with a fuel cell having means for drawing electrolyte therein is formed by a set of containers of electrolyte joined to respective fuel cells in a stack of such cells. The electrolyte is separately stored so as to provide for electrical isolation between electrolytes of the individual cells of the stack. Individual storage compartments are coupled by capillary tubes to the respective fuel cells. Hydrostatic pressure is maintained individually for each of the fuel cells by separately elevating each compartment of the storing means to a specific height above the corresponding fuel cell which is to be fed from that compartment of the storing means. The individual compartments are filled with electrolyte by allowing the compartments to overflow thereby maintaining the requisite depth of electrolyte in each of the storage compartments.

  19. A Command Economic System. Lesson Plan.

    ERIC Educational Resources Information Center

    Owens, Kimberly

    This lesson plan features a classroom simulation that helps students understand a command economic system. The lesson plan states a purpose; gives student educational objectives; suggests a time duration for the activity; lists materials needed; and outlines a step-by-step teaching procedure. Instructions for a research and writing homework…

  20. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  1. Control system devices : architectures and supply channels overview.

    SciTech Connect

    Trent, Jason; Atkins, William Dee; Schwartz, Moses Daniel; Mulder, John C.

    2010-08-01

    This report describes a research project to examine the hardware used in automated control systems like those that control the electric grid. This report provides an overview of the vendors, architectures, and supply channels for a number of control system devices. The research itself represents an attempt to probe more deeply into the area of programmable logic controllers (PLCs) - the specialized digital computers that control individual processes within supervisory control and data acquisition (SCADA) systems. The report (1) provides an overview of control system networks and PLC architecture, (2) furnishes profiles for the top eight vendors in the PLC industry, (3) discusses the communications protocols used in different industries, and (4) analyzes the hardware used in several PLC devices. As part of the project, several PLCs were disassembled to identify constituent components. That information will direct the next step of the research, which will greatly increase our understanding of PLC security in both the hardware and software areas. Such an understanding is vital for discerning the potential national security impact of security flaws in these devices, as well as for developing proactive countermeasures.

  2. Not planning a sustainable transport system

    SciTech Connect

    Finnveden, Göran Åkerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.

  3. A review of mission planning systems

    NASA Technical Reports Server (NTRS)

    Jones, M.; Sorensen, E. M.; Wolff, T.; Haddow, C. R.

    1993-01-01

    A general definition of Mission Planning is given. The definition covers the full scope of an end-to-end mission planning system. Noting the mission-specific nature of most mission planning systems, a classification of autonomous spacecraft missions is made into Observatory, Survey, multi-instrument science, and Telecommunications missions. The mission planning approach for one mission in each category is examined critically. The following missions were chosen: ISO (Infrared Space Observatory); ERS-1 (European Remote Sensing Satellite); and Eureca (European Retrievable Carrier). The paper gives a summary of lessons learned from these missions suggesting improvements in areas such as requirements analysis, testing, user interfacing, rules, and constraints handling. The paper will also examine commonalities in functions, which could constitute a basis for identification of generic mission planning support tools.

  4. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1992-01-01

    ALEPS, which is being developed to provide the SSF program with a computer system to automate logistics resupply/return cargo load planning and verification, is presented. ALEPS will make it possible to simultaneously optimize both the resupply flight load plan and the return flight reload plan for any of the logistics carriers. In the verification mode ALEPS will support the carrier's flight readiness reviews and control proper execution of the approved plans. It will also support the SSF inventory management system by providing electronic block updates to the inventory database on the cargo arriving at or departing the station aboard a logistics carrier. A prototype drawer packing algorithm is described which is capable of generating solutions for 3D packing of cargo items into a logistics carrier storage accommodation. It is concluded that ALEPS will provide the capability to generate and modify optimized loading plans for the logistics elements fleet.

  5. Vulnerability of water supply systems to cyber-physical attacks

    NASA Astrophysics Data System (ADS)

    Galelli, Stefano; Taormina, Riccardo; Tippenhauer, Nils; Salomons, Elad; Ostfeld, Avi

    2016-04-01

    The adoption of smart meters, distributed sensor networks and industrial control systems has largely improved the level of service provided by modern water supply systems. Yet, the progressive computerization exposes these critical infrastructures to cyber-physical attacks, which are generally aimed at stealing critical information (cyber-espionage) or causing service disruption (denial-of-service). Recent statistics show that water and power utilities are undergoing frequent attacks - such as the December power outage in Ukraine - , attracting the interest of operators and security agencies. Taking the security of Water Distribution Networks (WDNs) as domain of study, our work seeks to characterize the vulnerability of WDNs to cyber-physical attacks, so as to conceive adequate defense mechanisms. We extend the functionality of EPANET, which models hydraulic and water quality processes in pressurized pipe networks, to include a cyber layer vulnerable to repeated attacks. Simulation results on a medium-scale network show that several hydraulic actuators (valves and pumps, for example) can be easily attacked, causing both service disruption - i.e., water spillage and loss of pressure - and structural damages - e.g., pipes burst. Our work highlights the need for adequate countermeasures, such as attacks detection and reactive control systems.

  6. 40 CFR 160.45 - Test system supply facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... aquatic plants. (2) Facilities for plant growth, including, but not limited to greenhouses, growth... preserved by appropriate means. (b) When appropriate, plant supply facilities shall be provided....

  7. 40 CFR 160.45 - Test system supply facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... aquatic plants. (2) Facilities for plant growth, including, but not limited to greenhouses, growth... preserved by appropriate means. (b) When appropriate, plant supply facilities shall be provided....

  8. 40 CFR 160.45 - Test system supply facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... aquatic plants. (2) Facilities for plant growth, including, but not limited to greenhouses, growth... preserved by appropriate means. (b) When appropriate, plant supply facilities shall be provided....

  9. 40 CFR 160.45 - Test system supply facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... aquatic plants. (2) Facilities for plant growth, including, but not limited to greenhouses, growth... preserved by appropriate means. (b) When appropriate, plant supply facilities shall be provided....

  10. The Research on Integrated Strategy of Supply Chain Information Systems in the Automobile Industry Based on Order-To-Delivery Mode

    NASA Astrophysics Data System (ADS)

    Li, Ming; Gan, Lianzhen; He, Xuefeng

    The automotive industry there are different degrees of impairment of many companies supply chain IT strategy. In this paper, in which the automotive industry supply chain management business cooperation between enterprises loose, poor exchange of information leading to the presence or delays in product customization, supply of raw materials, material control, production planning and control, sales and service and a fast response propose a series of typical problems of scientific and rational supply chain information integration strategy. The strategy through the development system integration platform, improve internal ERP system, implementation of supply chain management and other methods. Put some protection principles in the information process, to ensure the correct implementation of supply chain IT strategy, and ultimately achieve collaborative business development concept and enhance the automotive industry as a whole level of information.

  11. Development and Evaluation of Control System for Microgrid Supplying Heat and Electricity

    NASA Astrophysics Data System (ADS)

    Kojima, Yasuhiro; Koshio, Masanobu; Nakamura, Shizuka

    Photovoltaic (PV) and Wind Turbine (WT) generation systems are expected to offer solutions to reduce green house gases and become more widely used in the future. However, the chief technical drawback of using these kinds of weather-dependent generators is the difficulty of forecasting their output, which can have negative impacts on commercial grids if a large number of them are introduced. Thus, this problem may hinder the wider application of PV and WT generation systems. The Regional Power Grid with Renewable Energy Resources Project was launched to seek a solution to this problem. The scope of the project is to develop, operate, and evaluate a Dispersed Renewable Energy Supply System with the ability to adapt the total energy output in response to changes in weather and demand. Such a system would reduce the impact that PV and WT generation systems have on commercial grids and allow the interconnection of more Dispersed Energy Resources (DER). In other words, the main objective of this project is to demonstrate an integrated energy management system, or a type of microgrid [1], as a new way of introducing DERs. The system has been in operation since October 2005 and will continue operation until March 2008. Through the project period, the data on power quality, system efficiency, operation cost, and environmental burden will be gathered and a cost-benefit analysis of the system will be undertaken. In this paper, firstly we introduce the concept of microgrid for reducing negative impact of natural energy, and secondly illustrate the structure of electric and thermal supply control system for Microgrid, especially for the Hachinohe demonstration project. The control system consists of four stages; weekly operation planning, economic dispatching control, tie-line control and local frequency control. And finally demonstration results and evaluation results are shown.

  12. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  13. Draft Automatic Data Acquisition System Plan

    SciTech Connect

    Not Available

    1987-04-01

    This Automatic Data Acquisition System (ADAS) Plan has been prepared in support of the requirement for detailed site characterization of the Deaf Smith County candidate repository site in salt, and describes the data acquisition system which will be used for unattended data collection from the geotechnical instrumentation installed at the site. Section 1.1 discusses the programmatic background to the plan, Section 1.2 presents the scope and purpose of the plan, and the organization of the document is given in Section 1.3. 31 refs., 34 figs., 8 tabs.

  14. 40 CFR 792.45 - Test system supply facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... maintaining algae and aquatic plants. (2) Facilities, as specified in the protocol, for plant growth, including but not limited to, greenhouses, growth chambers, light banks, and fields. (c) When appropriate... supplies shall be preserved by appropriate means. (b) When appropriate, plant supply facilities shall...

  15. 40 CFR 792.45 - Test system supply facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... maintaining algae and aquatic plants. (2) Facilities, as specified in the protocol, for plant growth, including but not limited to, greenhouses, growth chambers, light banks, and fields. (c) When appropriate... supplies shall be preserved by appropriate means. (b) When appropriate, plant supply facilities shall...

  16. 40 CFR 792.45 - Test system supply facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintaining algae and aquatic plants. (2) Facilities, as specified in the protocol, for plant growth, including but not limited to, greenhouses, growth chambers, light banks, and fields. (c) When appropriate... supplies shall be preserved by appropriate means. (b) When appropriate, plant supply facilities shall...

  17. 40 CFR 792.45 - Test system supply facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... maintaining algae and aquatic plants. (2) Facilities, as specified in the protocol, for plant growth, including but not limited to, greenhouses, growth chambers, light banks, and fields. (c) When appropriate... supplies shall be preserved by appropriate means. (b) When appropriate, plant supply facilities shall...

  18. What is the Nondominated Formulation? A Demonstration of de Novo Water Supply Portfolio Planning Under Deep Uncertainty

    NASA Astrophysics Data System (ADS)

    Kasprzyk, J. R.; Reed, P. M.; Characklis, G. W.; Kirsch, B. R.

    2010-12-01

    This paper proposes and demonstrates a new interactive framework for sensitivity-informed de Novo programming, in which a learning approach to formulating decision problems can confront the deep uncertainty within water management problems. The framework couples global sensitivity analysis using Sobol’ variance decomposition with multiobjective evolutionary algorithms (MOEAs) to generate planning alternatives and test their robustness to new modeling assumptions and scenarios. We explore these issues within the context of a risk-based water supply management problem, where a city seeks the most efficient use of a water market. The case study examines a single city’s water supply in the Lower Rio Grande Valley (LRGV) in Texas, using both a 10-year planning horizon and an extreme single-year drought scenario. The city’s water supply portfolio comprises a volume of permanent rights to reservoir inflows and use of a water market through anticipatory thresholds for acquiring transfers of water through optioning and spot leases. Diagnostic information from the Sobol’ variance decomposition is used to create a sensitivity-informed problem formulation testing different decision variable configurations, with tradeoffs for the formulation solved using a MOEA. Subsequent analysis uses the drought scenario to expose tradeoffs between long-term and short-term planning and illustrate the impact of deeply uncertain assumptions on water availability in droughts. The results demonstrate water supply portfolios’ efficiency, reliability, and utilization of transfers in the water supply market and show how to adaptively improve the value and robustness of our problem formulations by evolving our definition of optimality to discover key tradeoffs.

  19. NASA presentation. [wind energy conversion systems planning

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.

    1973-01-01

    The development of a wind energy system is outlined that supplies reliable energy at a cost competitive with other energy systems. A government directed industry program with strong university support is recommended that includes meteorological studies to estimate wind energy potentials and determines favorable regions and sites for wind power installations. Key phases of the overall program are wind energy conversion systems, meteorological wind studies, energy storage systems, and environmental impact studies. Performance testing with a prototype wind energy conversion and storage system is projected for Fiscal 1977.

  20. Generating Resources Supply Curves.

    SciTech Connect

    United States. Bonneville Power Administration. Division of Power Resources Planning.

    1985-07-01

    This report documents Pacific Northwest supply curve information for both renewable and other generating resources. Resources are characterized as ''Renewable'' and ''Other'' as defined in section 3 or the Pacific Northwest Electric Power Planning and Conservation Act. The following resources are described: renewable: (cogeneration; geothermal; hydroelectric (new); hydroelectric (efficiency improvement); solar; and wind); other (nonrenewable generation resources: coal; combustion turbines; and nuclear. Each resource has the following information documented in tabular format: (1) Technical Characteristics; (2) Costs (capital and O and M); (3) Energy Distribution by Month; and (4) Supply Forecast (energy). Combustion turbine (CT) energy supply is not forecasted because of CT's typical peaking application. Their supply is therefore unconstrained in order to facilitate analysis of their operation in the regional electrical supply system. The generic nuclear resource is considered unavailable to the region over the planning horizon.

  1. 48 CFR 11.701 - Supply contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Supply contracts. 11.701 Section 11.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Variation in Quantity 11.701 Supply contracts. (a) A fixed-price supply contract...

  2. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an... transit agency's system safety program plan is modified, the rail transit agency must submit the...

  3. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an... transit agency's system safety program plan is modified, the rail transit agency must submit the...

  4. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an... transit agency's system safety program plan is modified, the rail transit agency must submit the...

  5. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an... transit agency's system safety program plan is modified, the rail transit agency must submit the...

  6. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an... transit agency's system safety program plan is modified, the rail transit agency must submit the...

  7. Planning for an Irrigation System.

    ERIC Educational Resources Information Center

    Turner, J. Howard; Anderson, Carl L.

    The publication, with the aid of tables and colored illustrations and diagrams, presents information to help the farmer who is considering the installation of an irrigation system determine whether or not to irrigate, the type of system to use, and the irrigation cost and return on investment. Information is presented on the increase in yield to…

  8. The value of spatial analysis for tracking supply for family planning: the case of Kinshasa, DRC.

    PubMed

    Hernandez, Julie H; Akilimali, Pierre; Kayembe, Patrick; Dikamba, Nelly; Bertrand, Jane

    2016-10-01

    While geographic information systems (GIS) are frequently used to research accessibility issues for healthcare services around the world, sophisticated spatial analysis protocols and outputs often prove inappropriate and unsustainable to support evidence-based programme strategies in resource-constrained environments. This article examines how simple, open-source and interactive GIS tools have been used to locate family planning (FP) services delivery points in Kinshasa (Democratic Republic of Congo) and to identify underserved areas, determining the potential location of new service points, and to support advocacy for FP programmes. Using smartphone-based data collection applications (OpenDataKit), we conducted two surveys of FP facilities supported by partner organizations in 2012 and 2013 and used the results to assess gaps in FP services coverage, using both ratio of facilities per population and distance-based accessibility criteria. The cartographic outputs included both static analysis maps and interactive Google Earth displays, and sought to support advocacy and evidence-based planning for the placement of new service points. These maps, at the scale of Kinshasa or for each of the 35 health zones that cover the city, garnered a wide interest from the operational level of the health zones' Chief Medical Officers, who were consulted to contribute field knowledge on potential new service delivery points, to the FP programmes officers at the Ministry of Health, who could use the map to inform resources allocation decisions throughout the city. PMID:27084735

  9. The value of spatial analysis for tracking supply for family planning: the case of Kinshasa, DRC.

    PubMed

    Hernandez, Julie H; Akilimali, Pierre; Kayembe, Patrick; Dikamba, Nelly; Bertrand, Jane

    2016-10-01

    While geographic information systems (GIS) are frequently used to research accessibility issues for healthcare services around the world, sophisticated spatial analysis protocols and outputs often prove inappropriate and unsustainable to support evidence-based programme strategies in resource-constrained environments. This article examines how simple, open-source and interactive GIS tools have been used to locate family planning (FP) services delivery points in Kinshasa (Democratic Republic of Congo) and to identify underserved areas, determining the potential location of new service points, and to support advocacy for FP programmes. Using smartphone-based data collection applications (OpenDataKit), we conducted two surveys of FP facilities supported by partner organizations in 2012 and 2013 and used the results to assess gaps in FP services coverage, using both ratio of facilities per population and distance-based accessibility criteria. The cartographic outputs included both static analysis maps and interactive Google Earth displays, and sought to support advocacy and evidence-based planning for the placement of new service points. These maps, at the scale of Kinshasa or for each of the 35 health zones that cover the city, garnered a wide interest from the operational level of the health zones' Chief Medical Officers, who were consulted to contribute field knowledge on potential new service delivery points, to the FP programmes officers at the Ministry of Health, who could use the map to inform resources allocation decisions throughout the city.

  10. Tank waste remediation system configuration management plan

    SciTech Connect

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  11. Visible solar-ray supply system for space station

    NASA Astrophysics Data System (ADS)

    Mori, Kei; Tanatsugu, Nobuhiko; Yamashita, Masamichi

    The solar-ray supply system presented here will mainly provide the visible solar ray necessary for the various activities in the space station, such as cultivation experiments on plants, fishes, birds and animals, room lighting for modules, and crew sun-bathing. Even natural solar rays reaching earth surface contain harmful rays for human beings, animals, higher plants and algae: Ultraviolet rays of medium (UV-B) and long wavelength (UV-A), infrared and heat rays, are all harmful to life. On a space station, the most dangerous short-wavelength ultraviolet (UB-C), X-ray and gamma-ray are additionally included, besides those cited above in markedly higher intensity. The range of rays useful and harmless to life is the visible band of wavelengths. No conclusive studies have been conducted concerning the unexpected powerful effects on the growth of plants and algae that can be brought by pure visible solar rays, in comparison with the corresponding effects of other kinds of artificial light source.

  12. Administrative Information Systems Plan for FY89

    SciTech Connect

    Not Available

    1988-11-01

    The Administrative Information Systems (AIS) Plan was developed to prioritize, track, and control the cost of AIS activities. This annually published plan, in conjunction with quarterly status reports, measures projected AIS activities and progress. The AIS Plan and quarterly reporting are administered jointly by the Director of Computing and an Organization 30 director. Priority development projects are clearly defined and closely managed efforts that consume significant resources. Directorate supplementals describe other AIS activity within each directorate, which may include: production support; technical support; development activity; and other AIS effort.

  13. Public water supplies of North Carolina : a summary of water sources, use, treatment, and capacity of water-supply systems

    USGS Publications Warehouse

    Mann, L.T.

    1978-01-01

    Data were collected during 1970-76 on 224 public water supply systems in North Carolina with 500 or more customers. This report summarizes these data that were previously published in five separate regional reports. The data are presented in order to Council of Government region, county, and water system name and include population served, average and maximum daily use, industrial use, water source, allowable draft of surface-water supplies, raw water pumping capacity, raw and finished water storage, type of water treatment, treatment plant capacity, and a summary of the chemical quality of finished water. Tables and maps provide cross references for system names, counties, Council of Government regions and water source.

  14. Considerations of the Skilled Manpower Needs for Water Supply Systems.

    ERIC Educational Resources Information Center

    Watters, Gregor

    1981-01-01

    General methods for determining skilled labor needs for water supply and wastewater treatment plant operation as applied in Turkey are outlined along with a model program for training personnel to meet these needs. (DC)

  15. Guidelines for Planning in Colleges and Universities. Volume One, Planning System.

    ERIC Educational Resources Information Center

    Pinnell, Charles; Wacholder, Michael

    This volume outlines a system for effective planning in higher education. The system integrates management and program planning, physical plant planning, and financial planning into a single process designed to support institutional management and decision making at all administrative levels. Because successful planning is a process, procedures…

  16. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  17. National seismic system science plan

    SciTech Connect

    Heaton, T.H.; Anderson, D.L.; Arabasz, W.J.; Buland, R.; Ellsworth, W.L.; Hartzell, S.H.; Lay, T.; Spudich, P.

    1989-01-01

    Recent developments in digital communication and seismometry enable scientists to propose revolutionary new ways to reduce vulnerability from earthquakes, volcanoes, and tsunamis, to understand such phenomena, and to study the basic structure and dynamics of the Earth. This document briefly describes new ways that critical problems can be addressed using modern digital seismic networks, provides an overview of existing seismic networks, and suggests ways to integrate them into a National Seismic System. Such a system might significantly reduce societal risk from earthquake losses and open new areas of fundamental basic research.

  18. GPLAN: A Generalized Data Base Planning System.

    ERIC Educational Resources Information Center

    Nunamaker, J. F., Jr.; And Others

    It is recognized that there is a major gap between the promises of large data bases and optimization and simulation models and their actual ability to solve real world problems. This document describes a Generalized Data Base Planning System (GPLAN), currently being developed at Purdue University, that is proposed as a system to bridge this gap. A…

  19. Arizona Learning Systems Business Plan.

    ERIC Educational Resources Information Center

    Arizona State Board of Directors for Community Colleges, Phoenix.

    This paper describes Arizona Learning Systems (ALS), an alliance of Arizona community colleges developed in response to a state legislative appropriation for technology assisted learning. The appointed task force was to address the needed telecommunications connectivity between community college districts, and among community college districts,…

  20. Master's Degree in Management Information Systems with a Supply Chain Management Focus

    ERIC Educational Resources Information Center

    Ramaswamy, Kizhanatham V.; Boyd, Joseph L.; Desai, Mayur

    2007-01-01

    A graduate curriculum in Management Information Systems with a Supply Chain Management focus is presented. The motivation for this endeavor stems from the fact that the global scope of modern business organizations and the competitive environment in which they operate, requires an information system leveraged supply chain management system (SCM)…

  1. Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed pre-processing supply system designs

    SciTech Connect

    David J. Muth, Jr.; Matthew H. Langholtz; Eric C. D. Tan; Jacob J. Jacobson; Amy Schwab; May M. Wu; Andrew Argo; Craig C. Brandt; Kara G. Cafferty; Yi-Wen Chiu; Abhijit Dutta; Laurence M. Eaton; Erin M. Searcy

    2014-08-01

    The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advances in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to the

  2. Westinghouse Small Modular Reactor nuclear steam supply system design

    SciTech Connect

    Memmott, M. J.; Harkness, A. W.; Van Wyk, J.

    2012-07-01

    The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the first in a series of four papers which describe the design and functionality of the Westinghouse SMR. Also described in this series are the key drivers influencing the design of the Westinghouse SMR and the unique passive safety features of the Westinghouse SMR. Several critical motivators contributed to the development and integration of the Westinghouse SMR design. These design driving motivators dictated the final configuration of the Westinghouse SMR to varying degrees, depending on the specific features under consideration. These design drivers include safety, economics, AP1000{sup R} reactor expertise and experience, research and development requirements, functionality of systems and components, size of the systems and vessels, simplicity of design, and licensing requirements. The Westinghouse SMR NSSS consists of an integral reactor vessel within a compact containment vessel. The core is located in the bottom of the reactor vessel and is composed of 89 modified Westinghouse 17x17 Robust Fuel Assemblies (RFA). These modified fuel assemblies have an active core length of only 2.4 m (8 ft) long, and the entirety of the core is encompassed by a radial reflector. The Westinghouse SMR core operates on a 24 month fuel cycle. The reactor vessel is approximately 24.4 m (80 ft) long and 3.7 m (12 ft) in diameter in order to facilitate standard rail shipping to the site. The reactor vessel houses hot and cold leg channels to facilitate coolant flow, control rod drive mechanisms (CRDM), instrumentation and cabling, an intermediate flange to separate flow and instrumentation and facilitate simpler refueling, a pressurizer, a straight tube, recirculating steam

  3. Designing a mathematical model for integrating dynamic cellular manufacturing into supply chain system

    NASA Astrophysics Data System (ADS)

    Aalaei, Amin; Davoudpour, Hamid

    2012-11-01

    This article presents designing a new mathematical model for integrating dynamic cellular manufacturing into supply chain system with an extensive coverage of important manufacturing features consideration of multiple plants location, multi-markets allocation, multi-period planning horizons with demand and part mix variation, machine capacity, and the main constraints are demand of markets satisfaction in each period, machine availability, machine time-capacity, worker assignment, available time of worker, production volume for each plant and the amounts allocated to each market. The aim of the proposed model is to minimize holding and outsourcing costs, inter-cell material handling cost, external transportation cost, procurement & maintenance and overhead cost of machines, setup cost, reconfiguration cost of machines installation and removal, hiring, firing and salary worker costs. Aimed to prove the potential benefits of such a design, presented an example is shown using a proposed model.

  4. Analysis of residual chlorine in simple drinking water distribution system with intermittent water supply

    NASA Astrophysics Data System (ADS)

    Goyal, Roopali V.; Patel, H. M.

    2015-09-01

    Knowledge of residual chlorine concentration at various locations in drinking water distribution system is essential final check to the quality of water supplied to the consumers. This paper presents a methodology to find out the residual chlorine concentration at various locations in simple branch network by integrating the hydraulic and water quality model using first-order chlorine decay equation with booster chlorination nodes for intermittent water supply. The explicit equations are developed to compute the residual chlorine in network with a long distribution pipe line at critical nodes. These equations are applicable to Indian conditions where intermittent water supply is the most common system of water supply. It is observed that in intermittent water supply, the residual chlorine at farthest node is sensitive to water supply hours and travelling time of chlorine. Thus, the travelling time of chlorine can be considered to justify the requirement of booster chlorination for intermittent water supply.

  5. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    SciTech Connect

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-11-15

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  6. MODEL BASED BIOMASS SYSTEM DESIGN OF FEEDSTOCK SUPPLY SYSTEMS FOR BIOENERGY PRODUCTION

    SciTech Connect

    David J. Muth, Jr.; Jacob J. Jacobson; Kenneth M. Bryden

    2013-08-01

    Engineering feedstock supply systems that deliver affordable, high-quality biomass remains a challenge for the emerging bioenergy industry. Cellulosic biomass is geographically distributed and has diverse physical and chemical properties. Because of this feedstock supply systems that deliver cellulosic biomass resources to biorefineries require integration of a broad set of engineered unit operations. These unit operations include harvest and collection, storage, preprocessing, and transportation processes. Design decisions for each feedstock supply system unit operation impact the engineering design and performance of the other system elements. These interdependencies are further complicated by spatial and temporal variances such as climate conditions and biomass characteristics. This paper develops an integrated model that couples a SQL-based data management engine and systems dynamics models to design and evaluate biomass feedstock supply systems. The integrated model, called the Biomass Logistics Model (BLM), includes a suite of databases that provide 1) engineering performance data for hundreds of equipment systems, 2) spatially explicit labor cost datasets, and 3) local tax and regulation data. The BLM analytic engine is built in the systems dynamics software package PowersimTM. The BLM is designed to work with thermochemical and biochemical based biofuel conversion platforms and accommodates a range of cellulosic biomass types (i.e., herbaceous residues, short- rotation woody and herbaceous energy crops, woody residues, algae, etc.). The BLM simulates the flow of biomass through the entire supply chain, tracking changes in feedstock characteristics (i.e., moisture content, dry matter, ash content, and dry bulk density) as influenced by the various operations in the supply chain. By accounting for all of the equipment that comes into contact with biomass from the point of harvest to the throat of the conversion facility and the change in characteristics, the

  7. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  8. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  9. NASDA knowledge-based network planning system

    NASA Technical Reports Server (NTRS)

    Yamaya, K.; Fujiwara, M.; Kosugi, S.; Yambe, M.; Ohmori, M.

    1993-01-01

    One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.

  10. System-Level Planning, Coordination, and Communication

    PubMed Central

    Kanter, Robert K.; Dries, David; Luyckx, Valerie; Lim, Matthew L.; Wilgis, John; Anderson, Michael R.; Sarani, Babak; Hupert, Nathaniel; Mutter, Ryan; Devereaux, Asha V.; Christian, Michael D.; Kissoon, Niranjan; Christian, Michael D.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Rubinson, Lewis; Amundson, Dennis; Anderson, Michael R.; Balk, Robert; Barfield, Wanda D.; Bartz, Martha; Benditt, Josh; Beninati, William; Berkowitz, Kenneth A.; Daugherty Biddison, Lee; Braner, Dana; Branson, Richard D; Burkle, Frederick M.; Cairns, Bruce A.; Carr, Brendan G.; Courtney, Brooke; DeDecker, Lisa D.; De Jong, Marla J.; Dominguez-Cherit, Guillermo; Dries, David; Einav, Sharon; Erstad, Brian L.; Etienne, Mill; Fagbuyi, Daniel B.; Fang, Ray; Feldman, Henry; Garzon, Hernando; Geiling, James; Gomersall, Charles D.; Grissom, Colin K.; Hanfling, Dan; Hick, John L.; Hodge, James G.; Hupert, Nathaniel; Ingbar, David; Kanter, Robert K.; King, Mary A.; Kuhnley, Robert N.; Lawler, James; Leung, Sharon; Levy, Deborah A.; Lim, Matthew L.; Livinski, Alicia; Luyckx, Valerie; Marcozzi, David; Medina, Justine; Miramontes, David A.; Mutter, Ryan; Niven, Alexander S.; Penn, Matthew S.; Pepe, Paul E.; Powell, Tia; Prezant, David; Reed, Mary Jane; Rich, Preston; Rodriquez, Dario; Roxland, Beth E.; Sarani, Babak; Shah, Umair A.; Skippen, Peter; Sprung, Charles L.; Subbarao, Italo; Talmor, Daniel; Toner, Eric S.; Tosh, Pritish K.; Upperman, Jeffrey S.; Uyeki, Timothy M.; Weireter, Leonard J.; West, T. Eoin; Wilgis, John; Ornelas, Joe; McBride, Deborah; Reid, David; Baez, Amado; Baldisseri, Marie; Blumenstock, James S.; Cooper, Art; Ellender, Tim; Helminiak, Clare; Jimenez, Edgar; Krug, Steve; Lamana, Joe; Masur, Henry; Mathivha, L. Rudo; Osterholm, Michael T.; Reynolds, H. Neal; Sandrock, Christian; Sprecher, Armand; Tillyard, Andrew; White, Douglas; Wise, Robert; Yeskey, Kevin

    2014-01-01

    BACKGROUND: System-level planning involves uniting hospitals and health systems, local/regional government agencies, emergency medical services, and other health-care entities involved in coordinating and enabling care in a major disaster. We reviewed the literature and sought expert opinions concerning system-level planning and engagement for mass critical care due to disasters or pandemics and offer suggestions for system-planning, coordination, communication, and response. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS: The American College of Chest Physicians (CHEST) consensus statement development process was followed in developing suggestions. Task Force members met in person to develop nine key questions believed to be most relevant for system-planning, coordination, and communication. A systematic literature review was then performed for relevant articles and documents, reports, and other publications reported since 1993. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. RESULTS: Suggestions were developed and grouped according to the following thematic elements: (1) national government support of health-care coalitions/regional health authorities (HC/RHAs), (2) teamwork within HC/RHAs, (3) system-level communication, (4) system-level surge capacity and capability, (5) pediatric patients and special populations, (6) HC/RHAs and networks, (7) models of advanced regional care systems, and (8) the use of simulation for preparedness and planning. CONCLUSIONS: System-level planning is essential to provide care for large numbers of critically ill patients because of disaster or pandemic. It also entails a

  11. Projecting Global Decadal Change in Water Supply for Strategic Planning: Window Size Sensitivity in CMIP5 GCMs

    NASA Astrophysics Data System (ADS)

    Luck, M.; Landis, M.; Gassert, F.; Luo, T.; Reig, P.

    2013-12-01

    Climate adaptation and strategic planning by states, corporations, and long-term investors require reliable information on the range of possible climatic changes. However, most decision makers are incapable of planning over the century-scale time horizons for which global climate models (GCMs) are developed. Even the most forward-looking actors rarely consider scenarios more than several decades into the future. The mismatch in model design and practical demands poses a challenge in extracting useful information on the decadal scale from global climate change models. Here, we explore options and limitations in generating decadal water supply change projections, as evaluated for the World Resources Institute's Aqueduct project's estimates of future change in water stress. Our approach uses an ensemble of six CMIP5 GCMs, selected to represent a broad lineage of models that best reproduce the mean and standard deviation of recent streamflow records in 18 large river basins, bias corrected to GLDAS-2.0 runoff. We examine sensitivity of point estimates of climate normal supply and water supply variability (interannual and seasonal) at the years 2020, 2030, and 2040, with a focus on using temporal windows of different lengths (11-, 21-, and 31-years) to generate the point estimates. With the aim of creating practical information for non-expert audiences, we will discuss the persistent question of 'how can we balance uncertainty and usability in designing scientific data products?'

  12. Disaster recovery plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support for the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.

  13. Easy system call tracing for Plan 9.

    SciTech Connect

    Minnich, Ronald G.

    2010-09-01

    Tracing system calls makes debugging easy and fast. On Plan 9, traditionally, system call tracing has been implemented with acid. New systems do not always implement all the capabilities needed for Acid, particularly the ability to rewrite the process code space to insert breakpoints. Architecture support libraries are not always available for Acid, or may not work even on a supported architecture. The requirement that Acid's libraries be available can be a problem on systems with a very small memory footprint, such as High Performance Computing systems where every Kbyte counts. Finally, Acid tracing is inconvenient in the presence of forks, which means tracing shell pipelines is particularly troublesome. The strace program available on most Unix systems is far more convenient to use and more capable than Acid for system call tracing. A similar system on Plan 9 can simplify troubleshooting. We have built a system calling tracing capability into the Plan 9 kernel. It has proven to be more convenient than strace in programming effort. One can write a shell script to implement tracing, and the C code to implement an strace equivalent is several orders of magnitude smaller.

  14. Vendor System Vulnerability Testing Test Plan

    SciTech Connect

    James R. Davidson

    2005-01-01

    The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INL’s Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendor’s system.b a. The term System Provider replaces the name of the company/organization providing the system

  15. NASA aerospace pyrotechnically actuated systems: Program plan

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1992-01-01

    The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

  16. Identification, assessment, and control of hazards in water supply: experiences from Water Safety Plan implementations in Germany.

    PubMed

    Mälzer, H-J; Staben, N; Hein, A; Merkel, W

    2010-01-01

    According to the recommendations of the World Health Organization (WHO) for Water Safety Plans (WSP), a Technical Risk Management was developed, which considers standard demands in drinking water treatment in Germany. It was already implemented at several drinking water treatment plants of different size and treatment processes in Germany. Hazards affecting water quality, continuity, and the reliability of supply from catchment to treatment and distribution could be identified by a systematic approach, and suitable control measures were defined. Experiences are presented by detailed examples covering methods, practical consequences, and further outcomes. The method and the benefits for the water suppliers are discussed and an outlook on the future role of WSPs in German water supply is given.

  17. [Use od ozone for disinfection of ships' system of water supply contaminated by Pseudomonas aeruginosa].

    PubMed

    Rakhmanin, Iu A; Strikalenko, T V; Mokienko, A V; Stoianova, N V; Gutsel', Iu I

    1990-11-01

    Experimental substantiation is given of the use of ozone in doses, recommended for disinfection of water and ship water supply systems infected by Pseudomonas aeruginosa. The positive effect of ozonation of water supply systems infected by Pseudomonas aeruginosa was confirmed by results of field testing on ships of the Black sea marine steam-navigation.

  18. The State University System 2025 System Strategic Plan. Revised

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System 2025 Strategic Plan strengthens the Board of Governors' commitment to achieving excellence in the tripartite mission of its state universities--teaching, research, and public service--for the benefit of Florida's citizens, their communities, and the state economy. The Strategic Plan is a living document that helps align…

  19. Career Planning Support System. Final Report.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    The Career Planning Support System (CPSS) is a career guidance mechanism designed to provide the organizational structure and detailed procedural steps required to install or improve a schoolwide career development program. Rather than prescribing the specific career development activities schools should use, CPSS provides a means for schools to…

  20. A Systemic Plan of Technology Integration

    ERIC Educational Resources Information Center

    Hsu, Pi-Sui; Sharma, Priya

    2006-01-01

    The purpose of this article is to suggest a research-based systemic plan for educational researchers, practitioners, and policymakers involved in the change process to implement successful technology integration in the context of teacher education. This article provides a background about reform efforts in science education in the United States in…

  1. Structures and Opportunities to Supply the Telecommunication Systems in Underground Mines

    NASA Astrophysics Data System (ADS)

    Wojaczek, Antoni

    2016-06-01

    Telecommunication systems in underground mines require reliable power supply both of stationary and underground devices. Special problems connected with power supply occur in a case when subscriber devices are located in explosion hazard areas. The paper presents the basic problems connected with power supply of stationary elements of safety systems as well as subscriber devices located in explosion hazard areas that are significantly distant from stationary elements. Acceptable methods of supplying the subscribers devices under technical environment conditions of mine undergrounds have been determined.

  2. Quantitative assessment of resilience of a water supply system under rainfall reduction due to climate change

    NASA Astrophysics Data System (ADS)

    Amarasinghe, Pradeep; Liu, An; Egodawatta, Prasanna; Barnes, Paul; McGree, James; Goonetilleke, Ashantha

    2016-09-01

    A water supply system can be impacted by rainfall reduction due to climate change, thereby reducing its supply potential. This highlights the need to understand the system resilience, which refers to the ability to maintain service under various pressures (or disruptions). Currently, the concept of resilience has not yet been widely applied in managing water supply systems. This paper proposed three technical resilience indictors to assess the resilience of a water supply system. A case study analysis was undertaken of the Water Grid system of Queensland State, Australia, to showcase how the proposed indicators can be applied to assess resilience. The research outcomes confirmed that the use of resilience indicators is capable of identifying critical conditions in relation to the water supply system operation, such as the maximum allowable rainfall reduction for the system to maintain its operation without failure. Additionally, resilience indicators also provided useful insight regarding the sensitivity of the water supply system to a changing rainfall pattern in the context of climate change, which represents the system's stability when experiencing pressure. The study outcomes will help in the quantitative assessment of resilience and provide improved guidance to system operators to enhance the efficiency and reliability of a water supply system.

  3. Shuttle cryogenic supply system optimization study. Volume 4: Cryogenic cooling in environmental control systems

    NASA Technical Reports Server (NTRS)

    1973-01-01

    An analysis of cryogenic fluid cooling in the environmental control system of the space shuttle was conducted. The technique for treating the cryogenic fluid storage and supply tanks and subsystems as integrated systems was developed. It was concluded that a basic incompatibility exists between the heat generated and the cryogen usage rate and cryogens cannot be used to absorb the generated heat. The use of radiators and accumulators to provide additional cooling capability is recommended.

  4. Hydrologic and related data for water-supply planning in an intensive-study area, northeastern Wichita County, Kansas

    USGS Publications Warehouse

    Kume, Jack; Dunlap, L.E.; Gutentag, E.D.; Thomas, J.G.

    1979-01-01

    Data are presented that result from an intensive geohydrologic study for water-supply planning in a 12-square-mile area in northeastern Wichita County, Kansas. These data include records of wells, test drilling, chemical analyses, ground-water levels, rainfall, soil moisture, well yield, solar radiation, crop yield , and crop acreage. Data indicate that water levels in the unconsolidated aquifer are declining at an average annual rate of about 1 to 2 feet per year (1950-78). This decline is the aquifer 's response to pumping by irrigation wells for watering corn, wheat, grain sorghum, and other crops. (Kosco-USGS)

  5. An intelligent traceability system: Efficient tool for a supply chain sustainability

    NASA Astrophysics Data System (ADS)

    Bougdira, Abdesselam; Ahaitouf, Abdelaziz; Akharraz, Ismail

    2016-07-01

    The supply chain sustainability becomes a necessity for a smooth, a rapid and a fluid economic transaction. To reach a sustainable supply chain, we propose to focus attention on products and their lifecycle. So, we consider the traceability as a major success key to ensure the supply chain sustainability. For that, we consider a supply chain design that use an intelligent products traced by an intelligent traceability system. This system identifies, restores history and properties of a product, besides it tracks, in real-time a product. This solution can, also, bring, in the product environment, appropriate adjustments to prevent any risk of threatening qualities for the product. So, it helps supply chain contributors making the sustainable adjustments and the instant benchmark of the supply chain sustainability.

  6. Production roll out plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects, General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.

  7. Public Water-Supply Systems and Associated Water Use in Tennessee, 2000

    USGS Publications Warehouse

    Webbers, Ank

    2003-01-01

    Public water-supply systems in Tennessee provide water to meet customer needs for domestic, industrial, and commercial users and municipal services. In 2000, more than 500 public water-supply systems distributed about 890 million gallons per day (Mgal/d) of surface water and ground water to a population of about 5 million in Tennessee. Surface-water sources provided 64 percent (about 569 Mgal/d) of the State?s water supplies, primarily in Middle and East Tennessee. Ground water produced from wells and springs in Middle and East Tennessee and from wells in West Tennessee provided 36 percent (about 321 Mgal/d) of the public water supplies. Springs in Middle and East Tennessee provided about 14 percent (about 42 Mgal/d) of ground-water supplies used in the State. Per capita water use for Tennessee in 2000 was about 136 gallons per day. An additional 146 public water-supply systems provided approximately 84 Mgal/d of water supplies that were purchased from other water systems. Water withdrawals by public water-supply systems in Tennessee have increased by over 250 percent; from 250 Mgal/d in 1955 to 890 Mgal/d in 2000. Although Tennessee public water-supply systems withdraw less ground water than surface water, ground-water withdrawal rates reported by these systems continue to increase. In addition, the number of public water-supply systems reporting ground-water withdrawals of 1 Mgal/d or more in West Tennessee is increasing.

  8. Source-Water Protection and Water-Quality Investigations in the Cambridge, Massachusetts, Drinking-Water Supply System

    USGS Publications Warehouse

    Waldron, Marcus C.; Norton, Chip; MacDonald, Timothy W.D.

    1998-01-01

    Introduction The Cambridge Water Department (CWD) supplies about 15 million gallons of water each day to more than 95,000 customers in the City of Cambridge, Massachusetts. Most of this water is obtained from a system of reservoirs located in Cambridge and in parts of five other suburban-Boston communities. The drainage basin that contributes water to these reservoirs includes several potential sources of drinking-water contaminants, including major highways, secondary roads, areas of commercial and industrial development, and suburban residential tracts. The CWD is implementing a comprehensive Source-Water Protection Plan to ensure that the highest quality water is delivered to the treatment plant. A key element of this plan is a program that combines systematic monitoring of the drainage basin with detailed investigations of the effects of nonpoint-source contaminants, such as highway-deicing chemicals, nutrients, oxygen-demanding organic compounds, bacteria, and trace metals arising from stormwater runoff. The U.S. Geological Survey (USGS) is working with the CWD and the Massachusetts Highway Department (MassHighway) to develop a better understanding of the sources, transport, and fate of many of these contaminants. This Fact Sheet describes source-water protection and water-quality investigations currently underway in the Cambridge drinking-water supply system. The investigations are designed to complement a national effort by the USGS to provide water suppliers and regulatory agencies with information on the vulnerability of water supplies and the movement and fate of source-water contaminants.

  9. Performance of East Olkaria Power Plant and plans for maintaining steam supply in the future

    SciTech Connect

    Ouma, P.A.; Aloo, P.O.

    1995-12-31

    Olkaria East geothermal power plant has been in operation since 1981. The wells that supply the plant produce two phase fluid from a 240-340{degrees}C hot, low gas, liquid dominated reservoir which is related to volcanic pile and fractures. Separated steam from twenty seven (27) wells, flows to 3 x 15 MWe Mitsubishi direct contact condensing units while the brine is disposed off through infiltration ponds. The plant performance has been excellent with the plant equipment remaining in good shape after fourteen (14) years of operation as a result of favourable chemistry of discharge fluid. As predicted in the Reservoir Simulation studies for this field, there has been gradual decline in steam production from the wells supplying the plant. In order to maintain adequate supply of steam to the plant in the future, two schemes are being advanced. The first scheme is to re-inject water into the reservoir to offset the reservoir pressure drawdown and steam decline and effectively, limit the number of make-up wells to be drilled and connected to the plant. Secondly, leave out re-injection and establish a scheme for drilling and connection of the make-up wells. The cost implication of either of the alternatives has been addressed.

  10. Improvements in patient treatment planning systems

    SciTech Connect

    Wheeler, F.J.; Wessol, D.E.; Nigg, D.W.; Atkinson, C.A.; Babcock, R.; Evans, J.

    1995-01-01

    The Boron Neutron Capture Therapy, Radiation treatment planning environment (BNCT-Rtpe) software system is used to develop treatment planning information. In typical use BNCT-Rtpe consists of three main components: (1) Semi-automated geometric modeling of objects (brain, target, eyes, sinus) derived from MRI, CT, and other medical imaging modalities, (2) Dose computations for these geometric models with rtt-MC, the INEL Monte Carlo radiation transport computer code, and (3) Dose contouring overlaid on medical images as well as generation of other dose displays. We continue to develop a planning system based on three-dimensional image-based reconstructions using Bspline surfaces. Even though this software is in an experimental state, it has been applied for large animal research and for an isolated case of treatment for a human glioma. Radiation transport is based on Monte Carlo, however there will be implementations of faster methods (e.g. diffusion theory) in the future. The important thing for treatment planning is the output which must convey, to the radiologist, the deposition of dose to healthy and target tissue. Many edits are available such that one can obtain contours registered to medical image, dose/volume histograms and most information required for treatment planning and response assessment. Recent work has been to make the process more automatic and easier to use. The interface, now implemented for contouring and reconstruction, utilizes the Xwindowing system and the MOTIF graphical users interface for effective interaction with the planner. Much work still remains before the tool can be applied in a routine clinical setting.

  11. Assessing gaps and poverty-related inequalities in the public and private sector family planning supply environment of urban Nigeria.

    PubMed

    Levy, Jessica K; Curtis, Sian; Zimmer, Catherine; Speizer, Ilene S

    2014-02-01

    Nigeria is the most populous country in Africa, and its population is expected to double in <25 years (Central Intelligence Agency 2012; Fotso et al. 2011). Over half of the population already lives in an urban area, and by 2050, that proportion will increase to three quarters (United Nations, Department of Economic and Social Affairs, Population Division 2012; Measurement Learning & Evaluation Project, Nigerian Urban Reproductive Health Initiative, National Population Commission 2012). Reducing unwanted and unplanned pregnancies through reliable access to high-quality modern contraceptives, especially among the urban poor, could make a major contribution to moderating population growth and improving the livelihood of urban residents. This study uses facility census data to create and assign aggregate-level family planning (FP) supply index scores to 19 local government areas (LGAs) across six selected cities of Nigeria. It then explores the relationships between public and private sector FP services and determines whether contraceptive access and availability in either sector is correlated with community-level wealth. Data show pronounced variability in contraceptive access and availability across LGAs in both sectors, with a positive correlation between public sector and private sector supply environments and only localized associations between the FP supply environments and poverty. These results will be useful for program planners and policy makers to improve equal access to contraception through the expansion or redistribution of services in focused urban areas.

  12. Assessing gaps and poverty-related inequalities in the public and private sector family planning supply environment of urban Nigeria.

    PubMed

    Levy, Jessica K; Curtis, Sian; Zimmer, Catherine; Speizer, Ilene S

    2014-02-01

    Nigeria is the most populous country in Africa, and its population is expected to double in <25 years (Central Intelligence Agency 2012; Fotso et al. 2011). Over half of the population already lives in an urban area, and by 2050, that proportion will increase to three quarters (United Nations, Department of Economic and Social Affairs, Population Division 2012; Measurement Learning & Evaluation Project, Nigerian Urban Reproductive Health Initiative, National Population Commission 2012). Reducing unwanted and unplanned pregnancies through reliable access to high-quality modern contraceptives, especially among the urban poor, could make a major contribution to moderating population growth and improving the livelihood of urban residents. This study uses facility census data to create and assign aggregate-level family planning (FP) supply index scores to 19 local government areas (LGAs) across six selected cities of Nigeria. It then explores the relationships between public and private sector FP services and determines whether contraceptive access and availability in either sector is correlated with community-level wealth. Data show pronounced variability in contraceptive access and availability across LGAs in both sectors, with a positive correlation between public sector and private sector supply environments and only localized associations between the FP supply environments and poverty. These results will be useful for program planners and policy makers to improve equal access to contraception through the expansion or redistribution of services in focused urban areas. PMID:24248622

  13. Production planning and backup sourcing strategy of a buyer-dominant supply chain with random yield and demand

    NASA Astrophysics Data System (ADS)

    Chen, Kebing; Xiao, Tiaojun

    2015-11-01

    This paper studies the backup sourcing strategy of the buyer and the production planning of the supplier in presence of both random yield and random demand. Since the production is susceptible to the randomness of yield beyond the control of the supplier, the buyer may access to a backup sourcing option for the finished items. We analyse the value of backup sourcing for both the decentralised and centralised channels. Backup sourcing strategy of the buyer may lower the supply chain's performance. We show that the order quantity of the buyer does not change the stocking factor of the supplier's input. Meanwhile, compared with the centralised operation, the decentralised operation is more dependent on the backup sourcing to reduce supply shortage of the contracting supplier. From the channel's perspective, an incentive scheme is developed to facilitate the coordination of both the buyer and the contracting supplier, we show that the proposed option contract can allow the supply chain members to share the respective risks involved in the production and selling processes. Finally, we also provide qualitative insights based on numerical examples of the centralised and decentralised solutions.

  14. Efficiency and supply resource options for the upgrade of the Plzen district heating system

    SciTech Connect

    1996-06-01

    We examined options for meeting the district heating system steam and hot water heating loads associated with the Plzefi Central Heating Plant, two interconnected boilers serving the Kosutka and Bory regions, and the distributed systems in the Letna/Doubravka and Svetovar regions. The assessment applied integrated resource planning to combine the separate supply and demand-side assessments conducted for the system. Four system load scenarios were examined-high and low growth with and without programmatic efficiency. Hot water loads ranged from the current level of 277 megawatts thermal (MW{sub t}) to 320 MW{sub t} in a high growth scenario without efficiency to 253 MW{sub t} in a low growth scenario with programmatic efficiency. The high growth scenario includes an addition of approximately 50 MW{sub t} load from the connection of distributed boilers. An additional 250 MW{sub t} load served by distributed boilers may provide additional potential for system expansion. Steam loads are projected to increase from 93 MW{sub t} to 100 MW{sub t} in the high growth scenario and. decrease to 89 MW{sub t}, in the low growth scenario. Two system expansion cases were considered. The moderate system expansion provided for the Heat Line East I connection to serve the Letna/Doubravka region and the fall system expansion case further provided for the Heat Line East II connection to serve the Svetovar region. In the moderate case, the life of the Svetovar plant is extended to continue as a stand-alone system. Four central plant supply configurations providing for additional cogeneration capacity were applied to the load scenarios: 1. Life extension to existing facilities with a new coal-fired cogeneration unit in 2003, 2. Retirement of some existing units and a new coal-fired cogeneration unit in 1997, 3. Retirement of some existing units and a new gas- fired cogeneration unit in 1997, 4. Gas: Retirement of some exiting units a new gas-fired cogeneration unit in 1997.

  15. 42 CFR 493.1252 - Standard: Test systems, equipment, instruments, reagents, materials, and supplies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., reagents, materials, and supplies. 493.1252 Section 493.1252 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY..., instruments, reagents, materials, and supplies. (a) Test systems must be selected by the laboratory....

  16. Integrated system dynamics toolbox for water resources planning.

    SciTech Connect

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David; Chemak, Janie; Cockerill, Kristan; Aragon, Carlos , Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining , Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining , Socorro, NM); Roach, Jesse

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward achieving the technology development goals of this center.

  17. Servicer system demonstration plan and capability development

    NASA Technical Reports Server (NTRS)

    1987-01-01

    An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.

  18. Systems effects on family planning innovativeness.

    PubMed

    Lee, S B

    1983-12-01

    Data from Korea were used to explore the importance of community level variables in explaining family planning adoption at the individual level. An open system concept was applied, assuming that individual family planning behavior is influenced by both environmental and individual factors. The environmental factors were measured at the village level and designated as community characteristics. The dimension of communication network variables was introduced. Each individual was characterized in terms of the degree of her involvement in family planning communication with others in her village. It was assumed that the nature of the communication network linking individuals with each other effects family planning adoption at the individual level. Specific objectives were to determine 1) the relative importance of the specific independent variables in explaining family planning adoption and 2) the relative importance of the community level variables in comparison with the individual level variables in explaining family planning adoption at the individual level. The data were originally gathered in a 1973 research project on Korea's mothers' clubs. 1047 respondents were interviewed, comprising all married women in 25 sample villages having mothers' clubs. The dependent variable was family planning adoption behavior, defined as current use of any of the modern methods of family planning. The independent variables were defined at 3 levels: individual, community, and at a level intermediate between them involving communication links between individuals. More of the individual level independent variables were significantly correlated with the dependent variables than the community level variables. Among those variables with statistically significant correlations, the correlation coefficients were consistently higher for the individual level than for the community level variables. More of the variance in the dependent variable was explained by individual level than by

  19. Robust Decision Making and Info-Gap Decision Theory for water resource system planning

    NASA Astrophysics Data System (ADS)

    Matrosov, Evgenii S.; Woods, Ashley M.; Harou, Julien J.

    2013-06-01

    Stationarity assumptions of linked human-water systems are frequently invalid given the difficult-to-predict changes affecting such systems. In this case water planning occurs under conditions of deep or severe uncertainty, where the statistical distributions of future conditions and events are poorly known. In such situations predictive system simulation models are typically run under different scenarios to evaluate the performance of future plans under different conditions. Given that there are many possible plans and many possible futures, which simulations will lead to the best designs? Robust Decision Making (RDM) and Info-Gap Decision Theory (IGDT) provide a structured approach to planning complex systems under such uncertainty. Both RDM and IGDT make repeated use of trusted simulation models to evaluate different plans under different future conditions. Both methods seek to identify robust rather than optimal decisions, where a robust decision works satisfactorily over a broad range of possible futures. IGDT efficiently charts system performance with robustness and opportuneness plots summarising system performance for different plans under the most dire and favourable sets of future conditions. RDM samples a wider range of dire, benign and opportune futures and offers a holistic assessment of the performance of different options. RDM also identifies through ‘scenario discovery' which combinations of uncertain future stresses lead to system vulnerabilities. In our study we apply both frameworks to a water resource system planning problem: London's water supply system expansion in the Thames basin, UK. The methods help identify which out of 20 proposed water supply infrastructure portfolios is the most robust given severely uncertain future hydrological inflows, water demands and energy prices. Multiple criteria of system performance are considered: service reliability, storage susceptibility, capital and operating cost, energy use and environmental flows

  20. NSTX Protection And Interlock Systems For Coil And Powers Supply Systems

    SciTech Connect

    X. Zhao, S. Ramakrishnan, J. Lawson, C.Neumeyer, R. Marsala, H. Schneider, Engineering Operations

    2009-09-24

    NSTX at Princeton Plasma Physics Laboratory (PPPL) requires sophisticated plasma positioning control system for stable plasma operation. TF magnetic coils and PF magnetic coils provide electromagnetic fields to position and shape the plasma vertically and horizontally respectively. NSTX utilizes twenty six coil power supplies to establish and initiate electromagnetic fields through the coil system for plasma control. A power protection and interlock system is utilized to detect power system faults and protect the TF coils and PF coils against excessive electromechanical forces, overheating, and over current. Upon detecting any fault condition the power system is restricted, and it is either prevented from initializing or suppressed to de-energize coil power during pulsing. Power fault status is immediately reported to the computer system. This paper describes the design and operation of NSTX's protection and interlocking system and possible future expansion.

  1. North Carolina Community College System Information Resources and Technology Plan.

    ERIC Educational Resources Information Center

    North Carolina Community Coll. System, Raleigh.

    The North Carolina Community College System engaged in a strategic planning process in 1998 that was the basis for the information resources and technology plans for the entire System. A focus of the planning was technology, and a technology environmental scanning team developed a set of planning assumptions, which led to the creation of 15 goals…

  2. Reducing the Need for Accurate Stream Flow Forecasting for Water Supply Planning by Augmenting Reservoir Operations with Seawater Desalination and Wastewater Recycling

    NASA Astrophysics Data System (ADS)

    Bhushan, R.; Ng, T. L.

    2014-12-01

    Accurate stream flow forecasts are critical for reservoir operations for water supply planning. As the world urban population increases, the demand for water in cities is also increasing, making accurate forecasts even more important. However, accurate forecasting of stream flows is difficult owing to short- and long-term weather variations. We propose to reduce this need for accurate stream flow forecasts by augmenting reservoir operations with seawater desalination and wastewater recycling. We develop a robust operating policy for the joint operation of the three sources. With the joint model, we tap into the unlimited reserve of seawater through desalination, and make use of local supplies of wastewater through recycling. However, both seawater desalination and recycling are energy intensive and relatively expensive. Reservoir water on the other hand, is generally cheaper but is limited and variable in its availability, increasing the risk of water shortage during extreme climate events. We operate the joint system by optimizing it using a genetic algorithm to maximize water supply reliability and resilience while minimizing vulnerability subject to a budget constraint and for a given stream flow forecast. To compute the total cost of the system, we take into account the pumping cost of transporting reservoir water to its final destination, and the capital and operating costs of desalinating seawater and recycling wastewater. We produce results for different hydro climatic regions based on artificial stream flows we generate using a simple hydrological model and an autoregressive time series model. The artificial flows are generated from precipitation and temperature data from the Canadian Regional Climate model for present and future scenarios. We observe that the joint operation is able to effectively minimize the negative effects of stream flow forecast uncertainty on system performance at an overall cost that is not significantly greater than the cost of a

  3. Aquifer development planning to supply a seaside resort: a case study in Goa, India

    NASA Astrophysics Data System (ADS)

    Lobo Ferreira, J. P. Cárcomo; da Conceição Cunha, Maria; Chachadi, A. G.; Nagel, Kai; Diamantino, Catarina; Oliveira, Manuel Mendes

    2007-09-01

    Using the hydrogeological and socio-economic data derived from a European Commission research project on the measurement, monitoring and sustainability of the coastal environment, two optimization models have been applied to satisfy the future water resources needs of the coastal zone of Bardez in Goa, India. The number of tourists visiting Goa since the 1970s has risen considerably, and roughly a third of them go to Bardez taluka, prompting growth in the tourist-related infrastructure in the region. The optimization models are non-linear mixed integer models that have been solved using GAMS/DICOPT++ commercial software. Optimization models were used, firstly, to indicate the most suitable zones for building seaside resorts and wells to supply the tourist industry with an adequate amount of water, and secondly, to indicate the best location for wells to adequately supply pre-existing hotels. The models presented will help to define the optimal locations for the wells and the hydraulic infrastructures needed to satisfy demand at minimum cost, taking into account environmental constraints such as the risk of saline intrusion.

  4. ISAPS: Intelligent Scheduling And Planning System

    SciTech Connect

    King, M.S.; Rutherford, W.C.; Grice, J.V. . Kansas City Div.); Kessel, K.L.; Orel, M. )

    1990-08-01

    ISAPS is a scheduling and planning tool for shop floor personnel working in a Flexible Manufacturing System (FMS) environment. The ISAP system has two integrated components: the Predictive Scheduler (PS) and the Reactive Scheduler (RS). These components work cooperatively to satisfy the four goals of the ISAP system, which are: (G1) meet production due dates, (G2) maximize machining center utilization, (G3) minimize cutting tool migration, and (G4) minimize product flow time. The PS is used to establish schedules for new production requirements. The RS is used to adjust the schedules produced by the PS for unforeseen events that occur during production operations. The PS and RS subsystems have been developed using IntelliCorp's Knowledge Engineering Environment (KEE), an expert system development shell, and Common LISP. Software Quality Assurance (SQA) techniques have been incorporated throughout the development effort to assure the ISAP system meets the manufacturing goals and end user requirements. 5 refs., 4 figs.

  5. Air supply system for an internal combustion engine

    SciTech Connect

    Eftink, A.J.

    1991-03-12

    This patent describes a reciprocating piston internal combustion engine having a crankshaft and at least two cylinders, each cylinder having a displacement volume V{sub 1}, the improved means for supplying air to each cylinder. It comprises: a rotary, trochoidal chamber air pump defining at least one pair of pumping chambers, the number of pumping chambers being equal to the number of cylinders in the engine; air intake conduits connecting each pumping chamber to one cylinder of the engine; a rotor rotatable in each pair of pumping chambers, the rotor having three faces such that passage of a face of the rotor through a pumping chamber forces air in the pumping chamber into the associated air intake conduit and, consequently, into the engine cylinder; and means interconnecting the rotor and the crankshaft so as to rotate the rotor approximately one revolution for every three revolutions of the crankshaft.

  6. Strategic planning for power system restorations

    SciTech Connect

    Bent, Russell W; Van Hententyck, Pascal; Coffrin, Carleton

    2010-10-12

    This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

  7. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1988-01-01

    An interactive graphical proximity operations planning system was developed, which allows on-site design of efficient, complex, multiburn maneuvers in a dynamic multispacecraft environment. Maneuvering takes place in and out of the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of orbital dynamics and complex time-varying operational constraints. This difficulty is greatly overcome by visualizing the relative trajectories and the relevant constraints in an easily interpretable graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of a Space Station and co-orbiting spacecraft on the background of the Station's orbital plane. The operator has control over the two modes of operation: a viewing system mode, which enables the exporation of the spatial situation about the Space Station and thus the ability to choose and zoom in on areas of interest; and a trajectory design mode, which allows the interactive editing of a series of way points and maneuvering burns to obtain a trajectory that complies with all operational constraints. A first version of this display was completed. An experimental program is planned in which operators will carry out a series of design missions which vary in complexity and constraints.

  8. Reestablishing Public Health and Land Use Planning to Protect Public Water Supplies

    PubMed Central

    Greenberg, Michael; Mayer, Henry; Miller, K. Tyler; Hordon, Robert; Knee, Daniel

    2003-01-01

    Objectives. This study measured the extent to which land use, design, and engineering practices could reduce contamination of major public water supplies. Methods. Key parcels of land were identified in New Jersey, and the potential uncontrolled loading of contaminants was estimated with the US Environmental Protection Agency’s Long-Term Hydrologic Impact Assessment model for a variety of land use, design, and engineering scenarios. Results. High-density per-acre development and engineering controls, along with housing and light commercial activity near main railroads, would substantially reduce runoff. Conclusions. In New Jersey, government and purveyor action is being taken as a result of, and in support of, these findings. PMID:12948974

  9. Planning waste cooking oil collection systems.

    PubMed

    Ramos, Tânia Rodrigues Pereira; Gomes, Maria Isabel; Barbosa-Póvoa, Ana Paula

    2013-08-01

    This research has been motivated by a real-life problem of a waste cooking oil collection system characterized by the existence of multiple depots with an outsourced vehicle fleet, where the collection routes have to be plan. The routing problem addressed allows open routes between depots, i.e., all routes start at one depot but can end at the same or at a different one, depending on what minimizes the objective function considered. Such problem is referred as a Multi-Depot Vehicle Routing Problem with Mixed Closed and Open Inter-Depot Routes and is, in this paper, modeled through a mixed integer linear programming (MILP) formulation where capacity and duration constraints are taken into account. The model developed is applied to the real case study providing, as final results, the vehicle routes planning where a decrease of 13% on mileage and 11% on fleet hiring cost are achieved, when comparing with the current company solution.

  10. Automated power distribution system hardware. [for space station power supplies

    NASA Technical Reports Server (NTRS)

    Anderson, Paul M.; Martin, James A.; Thomason, Cindy

    1989-01-01

    An automated power distribution system testbed for the space station common modules has been developed. It incorporates automated control and monitoring of a utility-type power system. Automated power system switchgear, control and sensor hardware requirements, hardware design, test results, and potential applications are discussed. The system is designed so that the automated control and monitoring of the power system is compatible with both a 208-V, 20-kHz single-phase AC system and a high-voltage (120 to 150 V) DC system.

  11. Alaska SAR Facility Mission planning software - An interactive mission planning system

    NASA Technical Reports Server (NTRS)

    Lo, Martin W.

    1989-01-01

    The Alaska Synthetic Aperture Radar (SAR) Facility Mission Planning Subsystem is an interactive mission planning software system on the VAXStation 2000. This system has the capability to generate satellite ephemerides and mission parameters related to synthetic aperture radar missions. The mission data can be viewed as overlays on the world map in various projections and zooms. The system also provides schedule planning capabilities, using the INGRES DBMS to keep track of the various plans and schedules generated by the mission planner.

  12. [Comparison of different types automatic water-supply system for mouse rearing (author's transl)].

    PubMed

    Kikuchi, S; Suzuki, M; Tagashira, Y

    1979-04-01

    Rearing and breeding scores were compared between groups of mice (JCL : ICR and ddN strains) raised with two different types of automatic water-supply systems; the Japanese type and the American type, using manual water-supply system as control. The mice raised with the manual water-supply system were superior in body weight gain as compared to those with two automatic water-supply systems. As to the survival rate, however, the m; anual water-supply system and the Japanese type gave better results than the American type. As to weanling rate in the breeding test, the manual water-supply system gave somewhat better result than either of the two automatic types. Accidental water leaks, which are serious problems of automatic systems, occurred frequently only when the American type was used. Only one defect of the Japanese type revealed was that it was unfavorable for mice with smaller size (e.g., young ddN mice), resulting in lower body weight gain as well as lower breeding scores. PMID:477745

  13. Tank waste remediation system retrieval and disposal mission infrastructure plan

    SciTech Connect

    Root, R.W.

    1998-01-08

    This system plan presents the objectives, organization, and management and technical approaches for the Infrastructure Program. This Infrastructure Plan focuses on the Tank Waste Remediation System (TWRS) Project`s Retrieval and Disposal Mission.

  14. Frequency response of a jet engine test facility air supply system

    NASA Technical Reports Server (NTRS)

    Franke, M. E.; Ross, M. L.

    1985-01-01

    The frequency response of a laboratory scale model of a portion of the air supply system of an engine test facility is obtained both experimentally and using one-dimensional, small-signal, distributed parameter theory. The effects of line terminations and mean flow are considered. Good agreement between experiment and theory is obtained. Predictions are extended to a full scale test facility air supply system operating under several possible test conditions.

  15. Public water-supply systems and associated water use in Tennessee, 2005

    USGS Publications Warehouse

    Robinson, John A.; Brooks, Jaala M.

    2010-01-01

    Public water-supply systems in Tennessee provide water to for domestic, industrial, and commercial uses, and municipal services. In 2005, more than 569 public water-supply systems distributed about 920 million gallons per day (Mgal/d) of non-purchased surface water and groundwater to a population of nearly 6 million in Tennessee. Surface-water sources provided 64 percent (about 591 Mgal/d) of the State's water supplies. Groundwater produced from wells and springs in Middle and East Tennessee and from wells in West Tennessee provided 36 percent (about 329 Mgal/d) of the public water supplies. Gross per capita water use for Tennessee in 2005 was about 171 gallons per day. Water withdrawals by public water-supply systems in Tennessee have increased from 250 Mgal/d in 1955 to 920 Mgal/d in 2005. Tennessee public water-supply systems withdraw less groundwater than surface water, and surface-water use has increased at a faster rate than groundwater use. However, 34 systems reported increased groundwater withdrawals during 2000–2005, and 15 of these 34 systems reported increases of 1 Mgal/d or more. The county with the largest surface-water withdrawal rate (130 Mgal/d) was Davidson County. Each of Tennessee's 95 counties was served by at least one public water-supply system in 2005. The largest groundwater withdrawal rate (about 167 Mgal/d) by a single public water-supply system was reported by Memphis Light, Gas and Water, which served 654,267 people in Shelby County in 2005.

  16. Arsenic occurrence in drinking water supply systems in ten municipalities in Vojvodina Region, Serbia.

    PubMed

    Jovanovic, Dragana; Jakovljević, Branko; Rašić-Milutinović, Zorica; Paunović, Katarina; Peković, Gordana; Knezević, Tanja

    2011-02-01

    Vojvodina, a northern region of Serbia, belongs to the Pannonian Basin, whose aquifers contain high concentrations of arsenic. This study represents arsenic levels in drinking water in ten municipalities in Serbia. Around 63% of all water samples exceeded Serbian and European standards for arsenic in drinking water. Large variations in arsenic were observed among supply systems. Arsenic concentrations in public water supply systems in Vojvodina were much higher than in other countries in the Pannonian Basin.

  17. Application of Hotelling’s T{sup 2} charts in monitoring quality parameters in a drinking water supply system

    SciTech Connect

    Costa, Mafalda T.; Carolino, Elisabete; Oliveira, Teresa A.

    2015-03-10

    In water supply systems with distribution networkthe most critical aspects of control and Monitoring of water quality, which generates crises system, are the effects of cross-contamination originated by the network typology. The classics of control of quality systems through the application of Shewhart charts are generally difficult to manage in real time due to the high number of charts that must be completed and evaluated. As an alternative to the traditional control systems with Shewhart charts, this study aimed to apply a simplified methodology of a monitoring plan quality parameters in a drinking water distribution, by applying Hotelling’s T{sup 2} charts and supplemented with Shewhart charts with Bonferroni limits system, whenever instabilities with processes were detected.

  18. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    SciTech Connect

    King, D.A.

    1994-11-10

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan.

  19. Risk indicators for water supply systems for a drought Decision Support System in central Tuscany (Italy)

    NASA Astrophysics Data System (ADS)

    Rossi, Giuseppe; Garrote, Luis; Caporali, Enrica

    2010-05-01

    Identifying the occurrence, the extent and the magnitude of a drought can be delicate, requiring detection of depletions of supplies and increases in demand. Drought indices, particularly the meteorological ones, can describe the onset and the persistency of droughts, especially in natural systems. However they have to be used cautiously when applied to water supply systems. They show little correlation with water shortage situations, since water storage, as well as demand fluctuation, play an important role in water resources management. For that reason a more dynamic indicator relating supply and demand is required in order to identify situations when there is risk of water shortages. In water supply systems there is great variability on the natural water resources and also on the demands. These quantities can only be defined probabilistically. This great variability is faced defining some threshold values, expressed in probabilistic terms, that measure the hydrologic state of the system. They can identify specific actions in an operational context in different levels of severity, like the normal, pre-alert, alert and emergency scenarios. They can simplify the decision-making required during stressful periods and can help mitigate the impacts of drought by clearly defining the conditions requiring actions. The threshold values are defined considering the probability to satisfy a given fraction of the demand in a certain time horizon, and are calibrated through discussion with water managers. A simplified model of the water resources system is built to evaluate the threshold values and the management rules. The threshold values are validated with a long term simulation that takes into account the characteristics of the evaluated system. The levels and volumes in the different reservoirs are simulated using 20-30 years time series. The critical situations are assessed month by month in order to evaluate optimal management rules during the year and avoid conditions

  20. Accuracy and time requirements of a bar-code inventory system for medical supplies.

    PubMed

    Hanson, L B; Weinswig, M H; De Muth, J E

    1988-02-01

    The effects of implementing a bar-code system for issuing medical supplies to nursing units at a university teaching hospital were evaluated. Data on the time required to issue medical supplies to three nursing units at a 480-bed, tertiary-care teaching hospital were collected (1) before the bar-code system was implemented (i.e., when the manual system was in use), (2) one month after implementation, and (3) four months after implementation. At the same times, the accuracy of the central supply perpetual inventory was monitored using 15 selected items. One-way analysis of variance tests were done to determine any significant differences between the bar-code and manual systems. Using the bar-code system took longer than using the manual system because of a significant difference in the time required for order entry into the computer. Multiple-use requirements of the central supply computer system made entering bar-code data a much slower process. There was, however, a significant improvement in the accuracy of the perpetual inventory. Using the bar-code system for issuing medical supplies to the nursing units takes longer than using the manual system. However, the accuracy of the perpetual inventory was significantly improved with the implementation of the bar-code system.

  1. Essays on Infrastructure Design and Planning for Clean Energy Systems

    NASA Astrophysics Data System (ADS)

    Kocaman, Ayse Selin

    The International Energy Agency estimates that the number of people who do not have access to electricity is nearly 1.3 billion and a billion more have only unreliable and intermittent supply. Moreover, current supply for electricity generation mostly relies on fossil fuels, which are finite and one of the greatest threats to the environment. Rising population growth rates, depleting fuel sources, environmental issues and economic developments have increased the need for mathematical optimization to provide a formal framework that enables systematic and clear decision-making in energy operations. This thesis through its methodologies and algorithms enable tools for energy generation, transmission and distribution system design and help policy makers make cost assessments in energy infrastructure planning rapidly and accurately. In Chapter 2, we focus on local-level power distribution systems planning for rural electrification using techniques from combinatorial optimization. We describe a heuristic algorithm that provides a quick solution for the partial electrification problem where the distribution network can only connect a pre-specified number of households with low voltage lines. The algorithm demonstrates the effect of household settlement patterns on the electrification cost. We also describe the first heuristic algorithm that selects the locations and service areas of transformers without requiring candidate solutions and simultaneously builds a two-level grid network in a green-field setting. The algorithms are applied to real world rural settings in Africa, where household locations digitized from satellite imagery are prescribed. In Chapter 3 and 4, we focus on power generation and transmission using clean energy sources. Here, we imagine a country in the future where hydro and solar are the dominant sources and fossil fuels are only available in minimal form. We discuss the problem of modeling hydro and solar energy production and allocation, including

  2. The Vanuatu medical supply system – documenting opportunities and challenges to meet the Millennium Development Goals

    PubMed Central

    Brown, Andrew; Gilbert, Ben

    2012-01-01

    Objectives: Limited human resources are widely recognised as a barrier to achieve health-related Millennium Development Goals. Availability of medical supplies and suitably trained health personnel are crucial to ensuring a well-functioning medical supply system. The objective of this paper is to identify the factors which influence the availability of medical supplies within the health facilities of Vanuatu. Methods: A qualitative triangulated strategy using semi-structured interviews, observational workplace surveys and semi-structured focus groups was developed. This research was approved by the Human Ethics Committee of the University of Canberra and was funded through a direct grant from the United Nations Population Fund Suva, Pacific sub regional office. Results: During two weeks of data collection, 21 interviews were conducted, observational workplace surveys were completed in 19 facilities and 22 personnel participated in three focus groups across three provinces. The interviewees had a wide range of primary professional groupings and were representative of the Vanuatu health workforce. A complex array of medical supply issues are described from within the three tiered structure of the medical supply system. Conclusion: The results of this research have further informed our understanding of the competencies required by healthcare personnel to conduct medical supply management activities effectively in Pacific Island countries. As a result of this research, a platform is provided for the government of Vanuatu to engage development partners to work toward a sustainable medical supply system. PMID:23093895

  3. A solution procedure for mixed-integer nonlinear programming formulation of supply chain planning with quantity discounts under demand uncertainty

    NASA Astrophysics Data System (ADS)

    Yin, Sisi; Nishi, Tatsushi

    2014-11-01

    Quantity discount policy is decision-making for trade-off prices between suppliers and manufacturers while production is changeable due to demand fluctuations in a real market. In this paper, quantity discount models which consider selection of contract suppliers, production quantity and inventory simultaneously are addressed. The supply chain planning problem with quantity discounts under demand uncertainty is formulated as a mixed-integer nonlinear programming problem (MINLP) with integral terms. We apply an outer-approximation method to solve MINLP problems. In order to improve the efficiency of the proposed method, the problem is reformulated as a stochastic model replacing the integral terms by using a normalisation technique. We present numerical examples to demonstrate the efficiency of the proposed method.

  4. Endovascular Treatment of Hemoptysis by Abnormal Systemic Pulmonary Artery Supply

    SciTech Connect

    Munoz, J.J. Garcia, J.A.; Bentabol, M.; Padin, M.I.; Serrano, F.

    2008-03-15

    We report the case of a 29-year-old man with hemoptysis. The patient came to the emergency department, where a laboratory test and chest radiograph were reported as normal. The following day the patient again had hemoptysis, though less than previously. He reported no chest pain, dyspnea, fever, catarrh, changes in urine or feces, contact with patients with bacillus disease or constitutional symptoms. Doppler ultrasound of the chest showed right basal parenchymatous condensation containing a vessel with arterial flow (in the opposite direction to the aortic flow) compatible with an aberrant vessel, possibly a sequestration, leaving the aorta above the celiac trunk. Because of the findings of the chest echogram and magnetic resonance study, thoracoabdominal computed tomography angiography was undertaken; this showed right basal condensation and an anomalous vessel originating 1 cm above the celiac trunk, supplying the right lower lobe. An aortic and pulmonary arteriogram via an arterial and right femoral vein approach confirmed the findings. The patient was treated successfully with percutaneous embolization with coils. The relevant literature is reviewed.

  5. Tectonic and sediment supply control of deep rift lake turbidite systems: Lake Baikal, Russia

    USGS Publications Warehouse

    Nelson, C.H.; Karabanov, E.B.; Colman, Steven M.; Escutia, C.

    1999-01-01

    Tectonically influenced half-graben morphology controls the amount and type of sediment supply and consequent type of late Quaternary turbidite systems developed in the active rift basins of Lake Baikal, Russia. Steep border fault slopes (footwall) on the northwest sides of half-graben basins provide a limited supply of coarser grained clastic material to multiple small fan deltas. These multiple sediment sources in turn laterally feed small (65 km) axially fed elongate mud-rich fans sourced by regional exterior drainage of the Selenga River that supplies large quantities of silt. Basin plain turbidites in the center of the linear basins and axial channels that are controlled by rift-parallel faults are fed from, and interfinger with, aprons and fans. The predictability of the turbidite systems in Lake Baikal provides the best example yet studied of how tectonics and sediment supply interact to control the development of a wide variety of coeval turbidite systems on a single basin floor.

  6. 77 FR 44144 - National Forest System Land Management Planning; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... Forest Service 36 CFR Part 219 RIN 0596-AD02 National Forest System Land Management Planning; Correction...) published a National Forest System land management planning rule in the Federal Register, on April 9, 2012..., Subpart A--National Forest System Land Management Planning (36 CFR part 219, subpart A). One...

  7. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false System security plan: contents. 659.23 Section 659.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at...

  8. A production planning model considering uncertain demand using two-stage stochastic programming in a fresh vegetable supply chain context.

    PubMed

    Mateo, Jordi; Pla, Lluis M; Solsona, Francesc; Pagès, Adela

    2016-01-01

    Production planning models are achieving more interest for being used in the primary sector of the economy. The proposed model relies on the formulation of a location model representing a set of farms susceptible of being selected by a grocery shop brand to supply local fresh products under seasonal contracts. The main aim is to minimize overall procurement costs and meet future demand. This kind of problem is rather common in fresh vegetable supply chains where producers are located in proximity either to processing plants or retailers. The proposed two-stage stochastic model determines which suppliers should be selected for production contracts to ensure high quality products and minimal time from farm-to-table. Moreover, Lagrangian relaxation and parallel computing algorithms are proposed to solve these instances efficiently in a reasonable computational time. The results obtained show computational gains from our algorithmic proposals in front of the usage of plain CPLEX solver. Furthermore, the results ensure the competitive advantages of using the proposed model by purchase managers in the fresh vegetables industry. PMID:27386288

  9. Engineering task plan for purged light system

    SciTech Connect

    BOGER, R.M.

    1999-05-11

    A purged, closed circuit television system is currently used to video inside of waste tanks. The video is used to support inspection and assessment of the tank interiors, waste residues, and deployed hardware. The system is also used to facilitate deployment of new equipment. A new light source has been requested by Characterization Project Operations (CPO) for the video system. The current light used is mounted on the camera and provides 75 watts of light, which is insufficient for clear video. Other light sources currently in use on the Hanford site either can not be deployed in a 4-inch riser or do not meet the ignition source controls. The scope of this Engineering Task Plan is to address all activities associated with the specification and procurement of a light source for use with the existing CPO video equipment. The installation design change to tank farm facilities is not within the scope of this ETP.

  10. Expert system for neurosurgical treatment planning

    NASA Astrophysics Data System (ADS)

    Cheng, Andrew Y. S.; Chung, Sally S. Y.; Kwok, John C. K.

    1996-04-01

    A specially designed expert system is in development for neurosurgical treatment planning. The knowledge base contains knowledge and experiences on neurosurgical treatment planning from neurosurgeon consultants, who also determine the risks of different regions in human brains. When completed, the system can simulate the decision making process of neurosurgeons to determine the safest probing path for operation. The Computed Tomography (CT) or Magnetic Resonance Imaging (MRI) scan images for each patient are grabbed as the input. The system also allows neurosurgeons to include for any particular patient the additional information, such as how the tumor affects its neighboring functional regions, which is also important for calculating the safest probing path. It can then consider all the relevant information and find the most suitable probing path on the patient's brain. A 3D brain model is constructed for each set of the CT/MRI scan images and is displayed real-time together with the possible probing paths found. The precise risk value of each path is shown as a number between 0 and 1, together with its possible damages in text. Neurosurgeons can view more than one possible path simultaneously, and make the final decision on the selected path for operation.

  11. A Design Study of a Planning Information System for Kansas.

    ERIC Educational Resources Information Center

    Langston-Kitch and Associates, Inc., Wichita, KS.

    Efforts of this planning study are limited to the pressing needs of state agencies for planning which were identified earlier, plus an attempt to identify data elements common to many agencies that relate directly to the State Economic Development Planning Program. The major categories of data types essential to the planning system are land use,…

  12. Effectiveness of a Case-Based System in Lesson Planning

    ERIC Educational Resources Information Center

    Saad, A.; Chung, P. W. H.; Dawson, C. W.

    2014-01-01

    Lesson planning imposes a significant burden on teachers as they need to prepare different lesson plans for different classes according to various constraints. SmartLP, a case-based lesson planning system, has been implemented as a means of assisting teachers in constructing quality lesson plans more quickly. SmartLP enables teachers to retrieve…

  13. Public water-supply systems and water use in Tennessee, 1988

    USGS Publications Warehouse

    Hutson, Susan S.; Morris, A. Jannine

    1992-01-01

    This report summarizes the results of a study conducted by the U.S. Geological Survey, in cooperation with the Tennessee Department of Environment and Conservation (TDEC), Division of Water Supply in 1988. Data gathered during an inventory by the TDEC were collated to determine water use, supply sources, population served, and design and storage capacities of the systems. The inventory was limited to systems that were active on June 30, 1988. Results of a survey of the systems conducted by the Tennessee Department of Health and Environment during 1988 were a primary source of data for this report. Data from computer and manual files maintained by the Tennessee Department of Health and Environment and the U.S. Geological Survey also were used. The Division of Water Supply, TDEC, surveyed 541 public water-supply systems. These systems served 81 percent of the population of the State, or 3.95 million people. The gross per capita use statewide for public-supplied water was 179 gallons per day. Total water withdrawals for public supply increased about 39 percent from 510 million gallons per day (Mgal/d) in 1980, to 708 Mgalld in 1988. During the same period, the population increased about 7 percent. Surface-water withdrawals accounted for 63 percent (446 Mgal/d) of the total water withdrawn in the State. All of these withdrawals occurred in the Tennessee (56 percent or 249 Mgal/d) and the Ohio (44 percent or 197 Mgalld) hydrologic regions. Ground water supplied 262 Mgal/d or 37 percent of the total water withdrawn by public-supply systems statewide. Of that amount, 79 percent, or 208 Mgalld, was used in western Tennessee.

  14. Pilot projects for improving product tracing along the food supply system.

    PubMed

    Bhatt, Tejas; Hickey, Caitlin; McEntire, Jennifer C

    2013-12-01

    In September 2011, the U.S. Food and Drug Administration (FDA) asked the Institute of Food Technologists (IFT) to execute product tracing pilot projects as described in Section 204 of the FDA Food Safety Modernization Act (FSMA). IFT collaborated with representatives from more than 100 organizations-including the U.S. Dept. of Agriculture, state departments of agriculture and public health, industry, and consumer groups, as well as not-for-profit organizations-to implement the pilots. The objectives of the pilot projects were 1) to identify and gather information on methods to improve product tracing of foods in the supply chain and 2) to explore and evaluate methods to rapidly and effectively identify the recipient of food to prevent or mitigate a foodborne illness outbreak and to address credible threats of serious adverse health consequences or death to humans or animals as a result of such food being adulterated or misbranded. IFT conducted evaluations to determine the impact of currently available technologies, types of data and formats, and the data acquisition process, as well as the use of technology on the ability to follow product movement through the supply chain. Results from the pilots found inconsistencies in the terminology, numbering systems, formatting, legibility, and occasionally the language that sometimes required IFT to contact the submitting firm to gain clarity, thus increasing the time required to capture data before any meaningful analysis could begin. However, the pilot participants appeared to have many of the tools and processes in place which are required to allow the capture and communication of critical track and trace information (such as, key data elements) at critical points of product transfer and transformation (such as, critical tracking events). IFT determined that costs associated with implementing a product tracing system can vary widely as determined by numerous factors: the size of the firm/facility, the method of product

  15. Power supply of autonomous systems using solar modules

    NASA Astrophysics Data System (ADS)

    Yurchenko, A. V.; Zotov, L. G.; Mekhtiev, A. D.; Yugai, V. V.; Tatkeeva, G. G.

    2015-04-01

    The article shows the methods of constructing autonomous decentralized energy systems from solar modules. It shows the operation of up DC inverter. It demonstrates the effectiveness of DC inverters with varying structure. The system has high efficiency and low level of conductive impulse noise and at the same time the system is practically feasible. Electrical processes have been analyzed to determine the characteristics of operating modes of the main circuit elements. Recommendations on using the converters have been given.

  16. Biomass Feedstock and Conversion Supply System Design and Analysis

    SciTech Connect

    Jacob J. Jacobson; Mohammad S. Roni; Patrick Lamers; Kara G. Cafferty

    2014-09-01

    Idaho National Laboratory (INL) supports the U.S. Department of Energy’s bioenergy research program. As part of the research program INL investigates the feedstock logistics economics and sustainability of these fuels. A series of reports were published between 2000 and 2013 to demonstrate the feedstock logistics cost. Those reports were tailored to specific feedstock and conversion process. Although those reports are different in terms of conversion, some of the process in the feedstock logistic are same for each conversion process. As a result, each report has similar information. A single report can be designed that could bring all commonality occurred in the feedstock logistics process while discussing the feedstock logistics cost for different conversion process. Therefore, this report is designed in such a way that it can capture different feedstock logistics cost while eliminating the need of writing a conversion specific design report. Previous work established the current costs based on conventional equipment and processes. The 2012 programmatic target was to demonstrate a delivered biomass logistics cost of $55/dry ton for woody biomass delivered to fast pyrolysis conversion facility. The goal was achieved by applying field and process demonstration unit-scale data from harvest, collection, storage, preprocessing, handling, and transportation operations into INL’s biomass logistics model. The goal of the 2017 Design Case is to enable expansion of biofuels production beyond highly productive resource areas by breaking the reliance of cost-competitive biofuel production on a single, low-cost feedstock. The 2017 programmatic target is to supply feedstock to the conversion facility that meets the in-feed conversion process quality specifications at a total logistics cost of $80/dry T. The $80/dry T. target encompasses total delivered feedstock cost, including both grower payment and logistics costs, while meeting all conversion in-feed quality targets

  17. HACCP and water safety plans in Icelandic water supply: preliminary evaluation of experience.

    PubMed

    Gunnarsdóttir, María J; Gissurarson, Loftur R

    2008-09-01

    Icelandic waterworks first began implementing hazard analysis and critical control points (HACCP) as a preventive approach for water safety management in 1997. Since then implementation has been ongoing and currently about 68% of the Icelandic population enjoy drinking water from waterworks with a water safety plan based on HACCP. Preliminary evaluation of the success of HACCP implementation was undertaken in association with some of the waterworks that had implemented HACCP. The evaluation revealed that compliance with drinking water quality standards improved considerably following the implementation of HACCP. In response to their findings, waterworks implemented a large number of corrective actions to improve water safety. The study revealed some limitations for some, but not all, waterworks in relation to inadequate external and internal auditing and a lack of oversight by health authorities. Future studies should entail a more comprehensive study of the experience with the use of HACCP with the purpose of developing tools to promote continuing success.

  18. Planning for the Global Earth Observation System of Systems (GEOSS)

    USGS Publications Warehouse

    Christian, E.

    2005-01-01

    The Group on Earth Observations was established to promote comprehensive, coordinated, and sustained Earth observations. Its mandate is to implement the Global Earth Observation System of Systems (GEOSS) in accord with the GEOSS 10-Year Implementation Plan and Reference Document. During the months over which the GEOSS Implementation Plan was developed, many issues surfaced and were addressed. This article discusses several of the more interesting or challenging of those issues-e.g. fitting in with existing organizations and securing stable funding - some of which have yet to be resolved fully as of this writing. Despite the relatively short period over which the Implementation Plan had to be developed, there is a good chance that the work undertaken will be influential for decades to come. ?? 2005 Elsevier Ltd. All rights reserved.

  19. Information System Development: Phase I, Management Planning.

    ERIC Educational Resources Information Center

    Woods, Bill M.

    Objectives of this study of the operations of Engineering Index were to: (1) determine the need for a planning capability, (2) blueprint a mechanism to accomplish planning, and (3) recommend priorities requiring planning attention. Topics considered in the study are planning, the role of the board of directors and trustees, organizational…

  20. Electric energy supply systems: description of available technologies

    SciTech Connect

    Eisenhauer, J.L.; Rogers, E.A.; King, J.C.; Stegen, G.E.; Dowis, W.J.

    1985-02-01

    When comparing coal transportation with electric transmission as a means of delivering electric power, it is desirable to compare entire energy systems rather than just the transportation/transmission components because the requirements of each option may affect the requirements of other energy system components. PNL's assessment consists of two parts. The first part, which is the subject of this document, is a detailed description of the technical, cost, resource and environmental characteristics of each system component and technologies available for these components. The second part is a computer-based model that PNL has developed to simulate construction and operation of alternative system configurations and to compare the performance of these systems under a variety of economic and technical conditions. This document consists of six chapters and two appendices. A more thorough description of coal-based electric energy systems is presented in the Introduction and Chapter 1. Each of the subsequent chapters describes technologies for five system components: Western coal resources (Chapter 2), coal transportation (Chapter 3), coal gasification and gas transmission (Chapter 4), and electric power transmission (Chapter 6).

  1. Easily constructed, economical seawater intake and supply system

    USGS Publications Warehouse

    Bouck, G.R.

    1981-01-01

    A water intake system was designed and installed in Admiralty Inlet, Puget Sound, Washington. The dual system consisted of polyvinylchloride (PVC) pipes, a concrete pit and pumps located on shore at zero tide; and cables attached laterally to the pipelines and terminally between a shoreward anchor and to a seaward intake sled held in place with an 1800 kg Dansforth anchor. The overall construction costs were much lower than those for concrete-lined ductile iron pipe. Nearly three years after its construction, this system has withstood tides and storms without apparent adverse effect. Its application to lakes or rivers is equally possible.

  2. Energy harvesting circuit for sensor system power supply

    NASA Astrophysics Data System (ADS)

    Fiala, P.; Drexler, P.

    2011-06-01

    The paper presents two example approaches to energy harvesting. Mechanical energy harvesting system is based on vibrational minigenerator. Basic relations of its analytical model are given in order to obtain an idea about the operating conditions. Electromagnetic harvesting system is based on tuned resonant nano-structure. Its concepts allows impedance matching in order to operate in given frequency range. The matching properties are verified by means of numerical finite element analysis. For power management of vibration energy harvesting system several circuit design concepts are presented together with simulation results and basic properties comparison.

  3. Coverage versus supply cost in facility location: Physics of frustrated spin systems

    NASA Astrophysics Data System (ADS)

    Yeung, Chi Ho; Wong, K. Y. Michael; Li, Bo

    2014-06-01

    A comprehensive coverage is crucial for communication, supply, and transportation networks, yet it is limited by the requirement of extensive infrastructure and heavy energy consumption. Here, we draw an analogy between spins in antiferromagnet and outlets in supply networks, and apply techniques from the studies of disordered systems to elucidate the effects of balancing the coverage and supply costs on the network behavior. A readily applicable, coverage optimization algorithm is derived. Simulation results show that magnetized and antiferromagnetic domains emerge and coexist to balance the need for coverage and energy saving. The scaling of parameters with system size agrees with the continuum approximation in two dimensions and the tree approximation in random graphs. Due to frustration caused by the competition between coverage and supply cost, a transition between easy and hard computation regimes is observed. We further suggest a local expansion approach to greatly simplify the message updates which shed light on simplifications in other problems.

  4. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1989-01-01

    An interactive, graphical proximity operations planning system was developed which allows on-site design of efficient, complex, multiburn maneuvers in the dynamic multispacecraft environment about the space station. Maneuvering takes place in, as well as out of, the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of relative orbital motion trajectories and complex operational constraints, which are both time varying and highly dependent on the mission scenario. This difficulty is greatly overcome by visualizing the relative trajectories and the relative constraints in an easily interpretable, graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of the space station and co-orbiting spacecraft on the background of the station's orbital plane. The operator has control over two modes of operation: (1) a viewing system mode, which enables him or her to explore the spatial situation about the space station and thus choose and frame in on areas of interest; and (2) a trajectory design mode, which allows the interactive editing of a series of way-points and maneuvering burns to obtain a trajectory which complies with all operational constraints. Through a graphical interactive process, the operator will continue to modify the trajectory design until all operational constraints are met. The effectiveness of this display format in complex trajectory design is presently being evaluated in an ongoing experimental program.

  5. 46 CFR 161.002-9 - Automatic fire detecting system, power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Automatic fire detecting system, power supply. 161.002-9 Section 161.002-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Fire-Protective Systems § 161.002-9 Automatic fire detecting system,...

  6. 30 CFR 75.1107-8 - Fire suppression devices; extinguishant supply systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... systems. 75.1107-8 Section 75.1107-8 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT... Protection Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1107-8 Fire suppression devices; extinguishant supply systems. (a) Fire suppression systems using water...

  7. 30 CFR 75.1107-8 - Fire suppression devices; extinguishant supply systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... systems. 75.1107-8 Section 75.1107-8 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT... Protection Fire Suppression Devices and Fire-Resistant Hydraulic Fluids on Underground Equipment § 75.1107-8 Fire suppression devices; extinguishant supply systems. (a) Fire suppression systems using water...

  8. Distributed situation awareness in complex collaborative systems: A field study of bridge operations on platform supply vessels

    PubMed Central

    Sandhåland, Hilde; Oltedal, Helle A; Hystad, Sigurd W; Eid, Jarle

    2015-01-01

    This study provides empirical data about shipboard practices in bridge operations on board a selection of platform supply vessels (PSVs). Using the theoretical concept of distributed situation awareness, the study examines how situation awareness (SA)-related information is distributed and coordinated at the bridge. This study thus favours a systems approach to studying SA, viewing it not as a phenomenon that solely happens in each individual's mind but rather as something that happens between individuals and the tools that they use in a collaborative system. Thus, this study adds to our understanding of SA as a distributed phenomenon. Data were collected in four field studies that lasted between 8 and 14 days on PSVs that operate on the Norwegian continental shelf and UK continental shelf. The study revealed pronounced variations in shipboard practices regarding how the bridge team attended to operational planning, communication procedures, and distracting/interrupting factors during operations. These findings shed new light on how SA might decrease in bridge teams during platform supply operations. The findings from this study emphasize the need to assess and establish shipboard practices that support the bridge teams' SA needs in day-to-day operations. Practitioner points Provides insights into how shipboard practices that are relevant to planning, communication and the occurrence of distracting/interrupting factors are realized in bridge operations. Notes possible areas for improvement to enhance distributed SA in bridge operations. PMID:26028823

  9. Extravehicular mobility unit subcritical liquid oxygen storage and supply system

    NASA Technical Reports Server (NTRS)

    Anderson, John; Martin, Timothy; Hodgson, ED

    1992-01-01

    The storage of life support oxygen in the Extravehicular Mobility Unit in the liquid state offers some advantages over the current method of storing the oxygen as a high pressure gas. Storage volume is reduced because of the increased density associated with liquid. The lower storage and operating pressures also reduce the potential for leakage or bursting of the storage tank. The potential for combustion resulting from adiabatic combustion of the gas within lines and components is substantially reduced. Design constraints on components are also relaxed due to the lower system pressures. A design study was performed to determine the requirements for a liquid storage system and prepare a conceptual design. The study involved four tasks. The first was to identify system operating requirements that influence or direct the design of the system. The second was to define candidate storage system concepts that could possibly satisfy the requirements. An evaluation and comparison of the candidate concepts was conducted in the third task. The fourth task was devoted to preparing a conceptual design of the recommended storage system and to evaluate concerns with integration of the concept into the EMU. The results are presented.

  10. Probabilistic Analysis of Rechargeable Batteries in a Photovoltaic Power Supply System

    SciTech Connect

    Barney, P.; Ingersoll, D.; Jungst, R.; O'Gorman, C.; Paez, T.L.; Urbina, A.

    1998-11-24

    We developed a model for the probabilistic behavior of a rechargeable battery acting as the energy storage component in a photovoltaic power supply system. Stochastic and deterministic models are created to simulate the behavior of the system component;. The components are the solar resource, the photovoltaic power supply system, the rechargeable battery, and a load. Artificial neural networks are incorporated into the model of the rechargeable battery to simulate damage that occurs during deep discharge cycles. The equations governing system behavior are combined into one set and solved simultaneously in the Monte Carlo framework to evaluate the probabilistic character of measures of battery behavior.

  11. Leak Locating Experiment for Actual Underground Water Supply Pipelines with a Novel Locating System

    NASA Astrophysics Data System (ADS)

    Lee, Young-Sup; Yoon, Dong-Jin; Kang, Seokhoon; Jun, Kyungkoo; Choi, Byoungjo

    This paper presents a novel leak locating system to identify precise position of leak spots of underground water supply pipelines. The system has been studied and developed upon excellent foundation with modern mobile communication technology and the internet. However, the leak locating algorithm in the new system requires knowing the exact acoustical wave speed inside water-filled pipelines and the accurate time arrival difference between sensors to detect precise leak location. Especially the time difference is calculated with optimal maximum likelihood method. For the demonstration of the new system, an intensive experiment performed with 315 m long actual underground water supply pipelines showed an excellent detection capability.

  12. Central American information system for energy planning

    SciTech Connect

    Fonseca, M.G.; Lyon, P.C.; Heskett, J.C.

    1991-04-01

    SICAPE (Sistema de Information Centroamericano para Planificacion Energetica) is an expandable information system designed for energy planning. Its objective is to satisfy ongoing information requirements by means of a menu driver operational environment. SICAPE is as easily used by the novice computer user as those with more experience. Moreover, the system is capable of evolving concurrently with future requirements of the individual country. The expansion is accomplished by menu restructuring as data and user requirements change. The new menu configurations require no programming effort. The use and modification of SICAPE are separate menu-driven processes that allow for rapid data query, minimal training, and effortless continued growth. SICAPE's data is organized by country or region. Information is available in the following areas: energy balance, macro economics, electricity generation capacity, and electricity and petroleum product pricing. (JF)

  13. Human Frontal Lobes and AI Planning Systems

    NASA Technical Reports Server (NTRS)

    Levinson, Richard; Lum, Henry Jr. (Technical Monitor)

    1994-01-01

    Human frontal lobes are essential for maintaining a self-regulating balance between predictive and reactive behavior. This paper describes a system that integrates prediction and reaction based on neuropsychological theories of frontal lobe function. In addition to enhancing our understanding of deliberate action in humans' the model is being used to develop and evaluate the same properties in machines. First, the paper presents some background neuropsychology in order to set a general context. The role of frontal lobes is then presented by summarizing three theories which formed the basis for this work. The components of an artificial frontal lobe are then discussed from both neuropsychological and AI perspectives. The paper concludes by discussing issues and methods for evaluating systems that integrate planning and reaction.

  14. The Challenge of Providing Safe Water with an Intermittently Supplied Piped Water Distribution System

    NASA Astrophysics Data System (ADS)

    Kumpel, E.; Nelson, K. L.

    2012-12-01

    An increasing number of urban residents in low- and middle-income countries have access to piped water; however, this water is often not available continuously. 84% of reporting utilities in low-income countries provide piped water for fewer than 24 hours per day (van den Berg and Danilenko, 2010), while no major city in India has continuous piped water supply. Intermittent water supply leaves pipes vulnerable to contamination and forces households to store water or rely on alternative unsafe sources, posing a health threat to consumers. In these systems, pipes are empty for long periods of time and experience low or negative pressure even when water is being supplied, leaving them susceptible to intrusion from sewage, soil, or groundwater. Households with a non-continuous supply must collect and store water, presenting more opportunities for recontamination. Upgrading to a continuous water supply, while an obvious solution to these challenges, is currently out of reach for many resource-constrained utilities. Despite its widespread prevalence, there are few data on the mechanisms causing contamination in an intermittent supply and the frequency with which it occurs. Understanding the impact of intermittent operation on water quality can lead to strategies to improve access to safe piped water for the millions of people currently served by these systems. We collected over 100 hours of continuous measurements of pressure and physico-chemical water quality indicators and tested over 1,000 grab samples for indicator bacteria over 14 months throughout the distribution system in Hubli-Dharwad, India. This data set is used to explore and explain the mechanisms influencing water quality when piped water is provided for a few hours every 3-5 days. These data indicate that contamination occurs along the distribution system as water travels from the treatment plant to reservoirs and through intermittently supplied pipes to household storage containers, while real

  15. Power Supplies for Space Systems Quality Assurance by Sandia Laboratories

    DOE R&D Accomplishments Database

    Hannigan, R. L.; Harnar, R. R.

    1976-07-01

    The Sandia Laboratories` participation in Quality Assurance programs for Radioisotopic Thermoelectric Generators which have been used in space systems over the past 10 years is summarized. Basic elements of this QA program are briefly described and recognition of assistance from other Sandia organizations is included. Descriptions of the various systems for which Sandia has had the QA responsibility are presented, including SNAP 19 (Nimbus, Pioneer, Viking), SNAP 27 (Apollo), Transit, Multi Hundred Watt (LES 8/9 and MJS), and a new program, High Performance Generator Mod 3. The outlook for Sandia participation in RTG programs for the next several years is noted.

  16. ESB-Based Sensor Web Integration for the Prediction of Electric Power Supply System Vulnerability

    PubMed Central

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-01-01

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application. PMID:23955435

  17. ESB-based Sensor Web integration for the prediction of electric power supply system vulnerability.

    PubMed

    Stoimenov, Leonid; Bogdanovic, Milos; Bogdanovic-Dinic, Sanja

    2013-08-15

    Electric power supply companies increasingly rely on enterprise IT systems to provide them with a comprehensive view of the state of the distribution network. Within a utility-wide network, enterprise IT systems collect data from various metering devices. Such data can be effectively used for the prediction of power supply network vulnerability. The purpose of this paper is to present the Enterprise Service Bus (ESB)-based Sensor Web integration solution that we have developed with the purpose of enabling prediction of power supply network vulnerability, in terms of a prediction of defect probability for a particular network element. We will give an example of its usage and demonstrate our vulnerability prediction model on data collected from two different power supply companies. The proposed solution is an extension of the GinisSense Sensor Web-based architecture for collecting, processing, analyzing, decision making and alerting based on the data received from heterogeneous data sources. In this case, GinisSense has been upgraded to be capable of operating in an ESB environment and combine Sensor Web and GIS technologies to enable prediction of electric power supply system vulnerability. Aside from electrical values, the proposed solution gathers ambient values from additional sensors installed in the existing power supply network infrastructure. GinisSense aggregates gathered data according to an adapted Omnibus data fusion model and applies decision-making logic on the aggregated data. Detected vulnerabilities are visualized to end-users through means of a specialized Web GIS application.

  18. Advantages of integrated and sustainability based assessment for metabolism based strategic planning of urban water systems.

    PubMed

    Behzadian, Kourosh; Kapelan, Zoran

    2015-09-15

    Despite providing water-related services as the primary purpose of urban water system (UWS), all relevant activities require capital investments and operational expenditures, consume resources (e.g. materials and chemicals), and may increase negative environmental impacts (e.g. contaminant discharge, emissions to water and air). Performance assessment of such a metabolic system may require developing a holistic approach which encompasses various system elements and criteria. This paper analyses the impact of integration of UWS components on the metabolism based performance assessment for future planning using a number of intervention strategies. It also explores the importance of sustainability based criteria in the assessment of long-term planning. Two assessment approaches analysed here are: (1) planning for only water supply system (WSS) as a part of the UWS and (2) planning for an integrated UWS including potable water, stormwater, wastewater and water recycling. WaterMet(2) model is used to simulate metabolic type processes in the UWS and calculate quantitative performance indicators. The analysis is demonstrated on the problem of strategic level planning of a real-world UWS to where optional intervention strategies are applied. The resulting performance is assessed using the multiple criteria of both conventional and sustainability type; and optional intervention strategies are then ranked using the Compromise Programming method. The results obtained show that the high ranked intervention strategies in the integrated UWS are those supporting both water supply and stormwater/wastewater subsystems (e.g. rainwater harvesting and greywater recycling schemes) whilst these strategies are ranked low in the WSS and those targeting improvement of water supply components only (e.g. rehabilitation of clean water pipes and addition of new water resources) are preferred instead. Results also demonstrate that both conventional and sustainability type performance indicators

  19. IPDS: Integrated Planning Decision Support System

    SciTech Connect

    Mejia-Navarro, M.; Garcia, L.A.

    1995-12-31

    The Integrated Planning Decision Support System (IPDS) is designed as a decision support system (DSS) to assist governments and communities in evaluation of geological hazards, vulnerability, and risk. The IPDS system incorporates the Geographic Information Systems (GIS) Geographic Resource Analysis Support System (GRASS) and engineering numerical models within a Graphic User Interface (GUI), to provide the user with comprehensive modelling capabilities for geological hazards, vulnerability, and risk assessment. The methodology that IPDS follows for the evaluation of hazards takes into account the weight of each influencing factor within hazardous geologic processes. IPDS interactive algorithms compute the following parameters for each cell (based on the maximum resolution of the data): the related hazard, the vulnerability to geological hazards, and the risk. IPDS is designed to assess any generic hazard, such as debris flows, subsidence, and floods, with probable maximum precipitation and seismicity as triggering factors for susceptibility scenarios. The regular items considered in vulnerability analysis are (1) ecosystem sensitivity, (2) economic vulnerability, and (3) social infrastructure vulnerability. The risk is assessed as a function of hazard and vulnerability.

  20. Increased depot medroxyprogesterone acetate use increases family planning program pharmaceutical supply costs.

    PubMed

    Margulies, R; Miller, L

    2001-03-01

    To measure the use rates of depot medroxyprogesterone acetate and oral contraceptives and compare the costs between the two methods to see whether these trends had impacted the pharmaceutical acquisition costs for a family planning program, we compared vendor invoice costs over three time periods, 1992, 1994, and 1999. Visit types and client demographic statistics were tabulated from existing encounter record data sources. A local pharmaceutical chain was queried about their acquisition costs for similar products. Since 1992, depot medroxyprogesterone acetate use has increased from 3 to 17% while oral contraceptive use has decreased from 45 to 40% of contraceptive clients. The cost to our program for depot medroxyprogesterone acetate is $4.75 for 28 days and the average pill package is purchased for $1.35. The cost to our program is 4 times greater for the injection contraceptive user than for the oral contraceptive user. Approximately 80% of our clients have household incomes less than 200% of the poverty level and obtain their services from our program for free. This combination of increasing popularity and the high cost of depot medroxyprogesterone acetate has resulted in a great increase in the pharmacy acquisition cost. The oral contraceptive manufacturers make their products available at large discounts (20-fold reduction), but depot medroxyprogesterone acetate is not provided at a similar discount (2.8-fold reduction). We believe this is because there is no generic or competing product. The high cost of depot medroxyprogesterone acetate could jeopardize our ability to offer this highly effective method of birth control to all women. PMID:11368987

  1. Information Supply Chain System for Managing Rare Infectious Diseases

    ERIC Educational Resources Information Center

    Gopalakrishna-Remani, Venugopal

    2012-01-01

    Timely identification and reporting of rare infectious diseases has important economic, social and health implications. In this study, we investigate how different stakeholders in the existing reporting system influence the timeliness in identification and reporting of rare infectious diseases. Building on the vision of the information supply…

  2. 77 FR 48177 - Fuel Oil Systems for Emergency Power Supplies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... regulatory guide; extension of comment period. SUMMARY: On July 5, 2012 (77 FR 39745), the U.S. Nuclear...-0159. NRC's Agencywide Documents Access and Management System (ADAMS): You may access publicly... ADAMS. II. Background On July 5, 2012 (77 FR 39745), the NRC published a notice of issuance...

  3. Commercialization plan laser-based decoating systems

    SciTech Connect

    Freiwald, J.; Freiwald, D.A.

    1998-01-01

    F2 Associates Inc. (F2) is a small, high-technology firm focused on developing and commercializing environmentally friendly laser ablation systems for industrial-rate removal of surface coatings from metals, concrete, and delicate substrates such as composites. F2 has a contract with the US Department of Energy Federal Energy Technology Center (FETC) to develop and test a laser-based technology for removing contaminated paint and other contaminants from concrete and metal surfaces. Task 4.1 in Phase 2 of the Statement of Work for this DOE contract requires that F2 ``document its plans for commercializing and marketing the stationary laser ablation system. This document shall include a discussion of prospects for commercial customers and partners and may require periodic update to reflect changing strategy. This document shall be submitted to the DOE for review.`` This report is being prepared and submitted in fulfillment of that requirement. This report describes the laser-based technology for cleaning and coatings removal, the types of laser-based systems that have been developed by F2 based on this technology, and the various markets that are emerging for this technology. F2`s commercialization and marketing plans are described, including how F2`s organization is structured to meet the needs of technology commercialization, F2`s strategy and marketing approach, and the necessary steps to receive certification for removing paint from aircraft and DOE certification for D and D applications. The future use of the equipment built for the DOE contract is also discussed.

  4. Strategic stockpiling of power system supplies for disaster recovery

    SciTech Connect

    Bent, Russell W; Coffrein, Carleton; Van Hentenryck, Pascal

    2010-11-23

    This paper studies the Power System Stochastic Storage Problem (PSSSP), a novel application in power restoration which consists of deciding how to store power system components throughout a populated area to maximize the amount of power served after disaster restoration. The paper proposes an exact mixed-integer formulation for the linearized DC power flow model and a general column-generation approach. Both formulations were evaluated experimentally on benchmarks using the electrical power infrastructure of the United States and disaster scenarios generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. The results show that the column-generation algorithm produces near-optimal solutions quickly and produces orders of magnitude speedups over the exact formulation for large benchmarks. Moreover, both the exact and the column-generation formulations produce significant improvements over greedy approach and hence should yield significant benefits in practice.

  5. LUMIS: A Land Use Management Information System for urban planning

    NASA Technical Reports Server (NTRS)

    Paul, C. K.

    1975-01-01

    The Land Use Management Information System (LUMIS) consists of a methodology of compiling land use maps by means of air photo interpretation techniques, digitizing these and other maps into machine-readable form, and numerically overlaying these various maps in two computer software routines to provide land use and natural resource data files referenced to the individual census block. The two computer routines are the Polygon Intersection Overlay System (PIOS) and an interactive graphics APL program. A block referenced file of land use, natural resources, geology, elevation, slope, and fault-line items has been created and supplied to the Los Angeles Department of City Planning for the City's portion of the Santa Monica Mountains. In addition, the interactive system contains one hundred and seventy-three socio-economic data items created by merging the Third Count U.S. Census Bureau tapes and the Los Angeles County Secured Assessor File. This data can be graphically displayed for each and every block, block group, or tract for six test tracts in Woodland Hills, California. Other benefits of LUMIS are the knowledge of air photo availability, flight pattern coverage and frequencies, and private photogrammetry companies flying Southern California, as well as a formal Delphi study of relevant land use informational needs in the Santa Monicas.

  6. 111. 'PROPOSED CIRCULATION SYSTEM.' FROM FAIRFIELD COUNTY PLANNING ASSOCIATION, FAIRFIELD: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    111. 'PROPOSED CIRCULATION SYSTEM.' FROM FAIRFIELD COUNTY PLANNING ASSOCIATION, FAIRFIELD: THE FIRST PLANNED COUNTY IN NEW ENGLAND, JUNE 1933. - Merritt Parkway, Beginning in Greenwich & running 38 miles to Stratford, Greenwich, Fairfield County, CT

  7. 112. 'PROPOSED CIRCULATION SYSTEM.' FROM FAIRFIELD COUNTY PLANNING ASSOCIATION, FAIRFIELD: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    112. 'PROPOSED CIRCULATION SYSTEM.' FROM FAIRFIELD COUNTY PLANNING ASSOCIATION, FAIRFIELD: THE FIRST PLANNED COUNTY IN NEW ENGLAND. JUNE 1933. - Merritt Parkway, Beginning in Greenwich & running 38 miles to Stratford, Greenwich, Fairfield County, CT

  8. Space telescope observatory management system preliminary test and verification plan

    NASA Technical Reports Server (NTRS)

    Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.

    1982-01-01

    The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.

  9. A Taxonomy of the Health System Appropriate for Plan Development. Health Planning Methods and Technology Series.

    ERIC Educational Resources Information Center

    Government Studies & Systems, Philadelphia, PA.

    This report presents a two-dimensional framework for classifying the health system which is recommended for use by health planning agencies during plan development activities. The content is in six sections: The first section discusses the need for a consistent planning framework. Section 2 presents the rationale for the selection of health…

  10. Cover and startup gas supply system for solid oxide fuel cell generator

    DOEpatents

    Singh, P.; George, R.A.

    1999-07-27

    A cover and startup gas supply system for a solid oxide fuel cell power generator is disclosed. Hydrocarbon fuel, such as natural gas or diesel fuel, and oxygen-containing gas are supplied to a burner. Combustion gas exiting the burner is cooled prior to delivery to the solid oxide fuel cell. The system mixes the combusted hydrocarbon fuel constituents with hydrogen which is preferably stored in solid form to obtain a non-explosive gas mixture. The system may be used to provide both non-explosive cover gas and hydrogen-rich startup gas to the fuel cell. 4 figs.

  11. Cover and startup gas supply system for solid oxide fuel cell generator

    DOEpatents

    Singh, Prabhakar; George, Raymond A.

    1999-01-01

    A cover and startup gas supply system for a solid oxide fuel cell power generator is disclosed. Hydrocarbon fuel, such as natural gas or diesel fuel, and oxygen-containing gas are supplied to a burner. Combustion gas exiting the burner is cooled prior to delivery to the solid oxide fuel cell. The system mixes the combusted hydrocarbon fuel constituents with hydrogen which is preferably stored in solid form to obtain a non-explosive gas mixture. The system may be used to provide both non-explosive cover gas and hydrogen-rich startup gas to the fuel cell.

  12. Test and Operation of the WHMFC 12.6 MJ Capacitor Bank Power Supply System

    NASA Astrophysics Data System (ADS)

    Ding, H. F.; Jiang, C. X.; Xu, Y.; Ding, T. H.; Zou, X. T.; Li, L.; Pan, Y.

    2013-03-01

    The 12.6 MJ capacitor bank power supply system of the Wuhan National High Magnetic Field Center (WHMFC) at Huazhong University of Science and Technology (HUST) consists of 11 independent 1 MJ modules and 2 independent 0.8 MJ modules; it was tested and put into operation in October 2010. The capacitor bank power supply system connects to 8 measurement cells through three current collectors and four selectors. A number of nondestructive magnets for different bore sizes and peak fields have been energized by this system, including an 83 T dual stage magnet. The results of tests and operation are presented in this paper.

  13. Business System Planning Project, Alternatives Analysis

    SciTech Connect

    EVOSEVICH, S.

    2000-10-30

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files.

  14. Optimal Pipe Size Design for Looped Irrigation Water Supply System Using Harmony Search: Saemangeum Project Area

    PubMed Central

    Lee, Ho Min; Sadollah, Ali

    2015-01-01

    Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply. PMID:25874252

  15. Optimal pipe size design for looped irrigation water supply system using harmony search: Saemangeum project area.

    PubMed

    Yoo, Do Guen; Lee, Ho Min; Sadollah, Ali; Kim, Joong Hoon

    2015-01-01

    Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply.

  16. Focusing Conservation Efforts on Ecosystem Service Supply May Increase Vulnerability of Socio-Ecological Systems.

    PubMed

    Laterra, Pedro; Barral, Paula; Carmona, Alejandra; Nahuelhual, Laura

    2016-01-01

    Growing concern about the loss of ecosystem services (ES) promotes their spatial representation as a key tool for the internalization of the ES framework into land use policies. Paradoxically, mapping approaches meant to inform policy decisions focus on the magnitude and spatial distribution of the biophysical supply of ES, largely ignoring the social mechanisms by which these services influence human wellbeing. If social mechanisms affecting ES demand, enhancing it or reducing it, are taken more into account, then policies are more effective. By developing and applying a new mapping routine to two distinct socio-ecological systems, we show a strong spatial uncoupling between ES supply and socio-ecological vulnerability to the loss of ES, under scenarios of land use and cover change. Public policies based on ES supply might not only fail at detecting priority conservation areas for the wellbeing of human societies, but may also increase their vulnerability by neglecting areas of currently low, but highly valued ES supply.

  17. Electric vehicle system for charging and supplying electrical power

    DOEpatents

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  18. Nonregenerative natural resources in a sustainable system of energy supply.

    PubMed

    Bradshaw, Alex M; Hamacher, Thomas

    2012-03-12

    Following the lead of the European Union in introducing binding measures to promote the use of regenerative energy forms, it is not unreasonable to assume that the global demand for combustible raw materials for energy generation will be reduced considerably in the second half of this century. This will not only have a favourable effect on the CO(2) concentration in the atmosphere, but will also help preserve fossil fuels-important as raw materials in the chemical industry-for future generations. Nevertheless, associated with the concomitant massive shift to regenerative energy forms, there will be a strong demand for other exhaustible raw materials, in particular metals, some of which are already regarded as scarce. After reviewing the debate on mineral depletion between "cornucopians" and "pessimists", we discuss the meaning of mineral "scarcity", particularly in the geochemical sense, and mineral "exhaustion". The expected drastic increase in demand for mineral resources caused by demographic and societal pressures, that is, due to the increase in in-use stock, is emphasised. Whilst not discussing the issue of "strong" versus "weak" sustainability in detail, we conclude that regenerative energy systems-like nearly all resource-consuming systems in our society-do not necessarily satisfy generally accepted sustainability criteria. In this regard, we discuss some current examples, namely, lithium and cobalt for batteries, rare earth-based permanent magnets for wind turbines, cadmium and tellurium for solar cells and copper for electrical power distribution.

  19. The optimal planning computerized manufacturing systems

    NASA Astrophysics Data System (ADS)

    Neuts, M. F.; Lucanton, D. M.; Geiszler, C.

    1981-02-01

    The utility of interactive computation in answering questions on the behavior, design, and control of certain service systems is demonstrated. The stationary distributions of various waiting times are also discussed. A queue with N servers which may break down and require repair at a facility which has C repair crews is studied. Under exponential assumptions, this model has an algorithmically tractable solution. It is then a particular case of the M/M/n queue in a Markovian environment. It is shown that during periods when most servers are down, large build-ups may occur which affect the queue adversely for a long time afterwards. Potential applications are in manpower planning, as in a typing pool where persons may be absent, and in determining the size of a battery of machines, where machines may be inoperative due to maintenance and repair.

  20. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community college in…

  1. Power Supply System for the Atlas Experiment: Design Specifications, Implementation, Test and First Results

    NASA Astrophysics Data System (ADS)

    Lazzaroni, M.; Citterio, M.; Latorre, S.; Lanza, A.; Cova, P.; Delmonte, N.; Giuliani, F.

    2014-06-01

    The planned upgrade of instrumentation sensitivity in the ATLAS experiment of the Large Hadron Collider (LHC), at CERN, calls for a new type of power distribution architecture. Moreover, power supplies require DC-DC power converters able to work in very hostile environment and maintaining high level of Reliability, Availability, Maintainability and Safety (denoted as RAMS requirements) during the experimental activity. Two main issues need to be discussed: first, electronic devices and equipment must operate in very high background of both charged and neutral particles and high static magnetic field and, second, the increase of the radiation background and the requirements of new front-end electronics are indeed incompatible with the current capability of the actual distribution system. The APOLLO R&D collaboration, funded by the Italian Istituto Nazionale di Fisica Nucleare (INFN), aims to study dedicated topologies of both distribution system and DC-DC power converters and to design, build and test demonstrators, developing the needed technology for the industrialization phase. The collaboration has designed a 3kW, 280V-12V converter (MC) based on the Switch in Line architecture (SIL), a DC to DC phase-shifted converter characterized by a disposition in line of the MOSFETs with good soft switching performances, and in the last year many steps have been taken to enhance the power dissipation and the reliability and to improve the general features of the designed converter. In particular a new water heat sink was designed on the basis of TFD simulation accounting for the layout of the specific converter. Experimental activities in order to characterize both thermal and electrical features of the MC confirm the correctness of the adopted design criteria.

  2. Legacy system retirement plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    documentation baseline rather than to ensure the ability to reestablish an operational production system. The remainder of this document describes the planning for the removal of the identified systems from service at Hanford, The retirement requirements, planning schedules and costs are covered in the body of the document.

  3. System automatically supplies precise analytical samples of high-pressure gases

    NASA Technical Reports Server (NTRS)

    Langdon, W. M.

    1967-01-01

    High-pressure-reducing and flow-stabilization system delivers analytical gas samples from a gas supply. The system employs parallel capillary restrictors for pressure reduction and downstream throttling valves for flow control. It is used in conjunction with a sampling valve and minimizes alterations of the sampled gas.

  4. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  5. Management traceability information system for the food supply chain

    NASA Astrophysics Data System (ADS)

    Bendriss, S.; Benabdelhafid, A.; Boukachour, J.

    2008-06-01

    For a long time, the traceability was applied only for management reasons, but with the advent of new communication and information technologies more and more used in the logistic medium, the notion of the traceability became new extensive to meet the new market needs in term of information by ensuring accessibility the data characteristic or been dependent on the product throughout its life cycle. On the basis of this postulate, we tried to raise some questions of research, beginning by the presentation of the progress achieved, assumptions and objective relating to the traceability, in the second time we mentioned principal work by showing how evolved the scientific question especially the information systems integrating the traceability were developed very little in the literature. Based on what was developed in the first part, we present our generic modeling approach of communicating product "smart object", able to take into account the various essential elements for its traceability: the product in its various states, various operations carried out on the product, resources used, its localization, and interactions between the product and its environment carried out on the basis of whole of service. In order to validate our generic modeling, a case of study representing an application in a context of food industry is presented.

  6. Experimental investigation on a turbine compressor for air supply system of a fuel cell

    SciTech Connect

    Matsuda, Masayasu; Tsuchiyama, Syozo

    1996-12-31

    This report covers part of a joint study on a PEFC propulsion system for surface ships, summarized in a presentation to this Seminar, entitled {open_quotes}Study on a Polymer Electrolyte Fuel Cell (PEFC) Propulsion System for Surface Ships{close_quotes}, and which envisages application to a 1,500 DWT cargo vessel. The aspect treated here concerns a study on the air supply system for the PEFC, with particular reference to system components.

  7. Oxygen supplies in disaster management.

    PubMed

    Blakeman, Thomas C; Branson, Richard D

    2013-01-01

    Mass casualty events and disasters, both natural and human-generated, occur frequently around the world and can generate scores of injured or ill victims in need of resources. Of the available medical supplies, oxygen remains the critical consumable resource in disaster management. Strategic management of oxygen supplies in disaster scenarios remains a priority. Hospitals have large supplies of liquid oxygen and a supply of compressed gas oxygen cylinders that allow several days of reserve, but a large influx of patients from a disaster can strain these resources. Most backup liquid oxygen supplies are attached to the main liquid system and supply line. In the event of damage to the main system, the reserve supply is rendered useless. The Strategic National Stockpile supplies medications, medical supplies, and equipment to disaster areas, but it does not supply oxygen. Contracted vendors can deliver oxygen to alternate care facilities in disaster areas, in the form of concentrators, compressed gas cylinders, and liquid oxygen. Planning for oxygen needs following a disaster still presents a substantial challenge, but alternate care facilities have proven to be valuable in relieving pressure from the mass influx of patients into hospitals, especially for those on home oxygen who require only an electrical source to power their oxygen concentrator. PMID:23271827

  8. Oxygen supplies in disaster management.

    PubMed

    Blakeman, Thomas C; Branson, Richard D

    2013-01-01

    Mass casualty events and disasters, both natural and human-generated, occur frequently around the world and can generate scores of injured or ill victims in need of resources. Of the available medical supplies, oxygen remains the critical consumable resource in disaster management. Strategic management of oxygen supplies in disaster scenarios remains a priority. Hospitals have large supplies of liquid oxygen and a supply of compressed gas oxygen cylinders that allow several days of reserve, but a large influx of patients from a disaster can strain these resources. Most backup liquid oxygen supplies are attached to the main liquid system and supply line. In the event of damage to the main system, the reserve supply is rendered useless. The Strategic National Stockpile supplies medications, medical supplies, and equipment to disaster areas, but it does not supply oxygen. Contracted vendors can deliver oxygen to alternate care facilities in disaster areas, in the form of concentrators, compressed gas cylinders, and liquid oxygen. Planning for oxygen needs following a disaster still presents a substantial challenge, but alternate care facilities have proven to be valuable in relieving pressure from the mass influx of patients into hospitals, especially for those on home oxygen who require only an electrical source to power their oxygen concentrator.

  9. Preliminary business plan: Plzen district heating system upgrade

    SciTech Connect

    1996-06-01

    The district heating system of the City of Plzen, Czech Republic, needs to have physical upgrades to replace aging equipment and to comply with upcoming environmental regulations. Also, its ownership and management are being changed as a result of privatization. As majority owner, the City has the primary goal of ensuring that the heating needs of its customers are met as reliably and cost-effectively as possible. This preliminary business plan is part of the detailed analysis (5 reports in all) done to assist the City in deciding the issues. Preparation included investigation of ownership, management, and technology alternatives; estimation of market value of assets and investment requirements; and forecasting of future cash flow. The district heating system consists of the Central Plzen cogeneration plant, two interconnected heating plants [one supplying both hot water and steam], three satellite heating plants, and cooperative agreements with three industrial facilities generating steam and hot water. Most of the plants are coal-fired, with some peaking units fired by fuel oil.

  10. System integration test plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-24

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  11. Systemic Supply to a Pulmonary Arteriovenous Malformation: Potential Explanation for Recurrence

    SciTech Connect

    Wispelaere, Jean-Francois De; Trigaux, Jean-Paul; Weynants, Patrick; Delos, Monique; Coene, Beatrice De

    1996-04-15

    A pregnant woman presented with hereditary hemorrhagic telangiectasia (Osler-Weber-Rendu syndrome) and a single pulmonary arteriovenous malformation (AVM) that had been embolized 5 years previously. Partly due to pregnancy, recanalization of the aneurysm occurred with subsequent hemoptysis. Despite successful therapeutic reembolization of the afferent pulmonary artery, hemoptysis recurred 5 days later. At this time, recanalization of the pulmonary artery was not demonstrated by pulmonary angiography, but a systemic angiogram revealed a bronchial arterial supply to the pulmonary AVM. A systemic supply should always be sought in cases of recurrent hemoptysis after technically successful embolization of the feeding pulmonary artery.

  12. Geographic information system programs for use in the water-supply-allocation permitting process

    USGS Publications Warehouse

    Dunne, Paul; Price, C.V.

    1995-01-01

    Computer programs designed for use in a geographic information system as an aid in the water-supply- allocation permitting process are described. These programs were developed by the U.S. Geological Survey during a project conducted in cooperation with the New Jersey Department of Environmental Protection. The programs enable a user to display proposed water-supply-allocation sites in a defined area together with present sites and important hydrologic and geographic features on a computer screen or on hardcopy plots. The programs are menu-driven and do not require familiarity with geographic information systems. Source codes for the programs are included in appendixes.

  13. Effect of residential solar and storage on centralized electricity supply systems

    NASA Astrophysics Data System (ADS)

    Agnew, Scott; Dargusch, Paul

    2015-04-01

    Residential solar photovoltaic systems combined with affordable battery storage are becoming increasingly likely to drive a consumer-led, low-emission evolution of modern electricity supply systems. In the past decade, a multi-billion-dollar boom in solar photovoltaic development across the globe has disrupted the way in which centralized electricity systems operate. At the same time, solar photovoltaic power has begun to make a material contribution to reduction targets for greenhouse gas emissions. Viable electricity storage solutions are now on the cusp of a rapidly declining price trajectory. When coupled with solar photovoltaic systems, battery storage could become one of the most disruptive influences to impact the electricity sector in decades, yet governments and the broader power sector are poorly prepared. In this Perspective, we examine emerging trends and proffer a systems framework to analyse the disruptive influence of residential solar photovoltaic and storage systems on existing centralized electricity supply systems.

  14. Operations system administration plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources, Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.

  15. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  16. Intelligent control of a planning system for astronaut training.

    PubMed

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  17. Co-Adapting Water Demand and Supply to Changing Climate in Agricultural Water Systems, A Case Study in Northern Italy

    NASA Astrophysics Data System (ADS)

    Giuliani, M.; Li, Y.; Mainardi, M.; Arias Munoz, C.; Castelletti, A.; Gandolfi, C.

    2013-12-01

    Exponentially growing water demands and increasing uncertainties in the hydrologic cycle due to changes in climate and land use will challenge water resources planning and management in the next decade. Improving agricultural productivity is particularly critical, being this sector the one characterized by the highest water demand. Moreover, to meet projected growth in human population and per-capita food demand, agricultural production will have to significantly increase in the next decades, even though water availability is expected to decrease due to climate change impacts. Agricultural systems are called to adapt their strategies (e.g., changing crop patterns and the corresponding water demand, or maximizing the efficiency in the water supply modifying irrigation scheduling and adopting high efficiency irrigation techniques) in order to re-optimize the use of limited water resources. Although many studies have assessed climate change impacts on agricultural practices and water management, most of them assume few scenarios of water demand or water supply separately, while an analysis of their reciprocal feedbacks is still missing. Moreover, current practices are generally established according to historical agreements and normative constraints and, in the absence of dramatic failures, the shift toward more efficient water management is not easily achievable. In this work, we propose to activate an information loop between farmers and water managers to improve the effectiveness of agricultural water management practices by matching the needs of the farmers with the design of water supply strategies. The proposed approach is tested on a real-world case study, namely the Lake Como serving the Muzza-Bassa Lodigiana irrigation district (Italy). A distributed-parameter, dynamic model of the system allows to simulate crop growth and the final yield over a range of hydro-climatic conditions, irrigation strategies and water-related stresses. The spatial component of the

  18. Solar electric propulsion system /SEPS/ program plans and system definition

    NASA Technical Reports Server (NTRS)

    Austin, R. E.; Kisko, W. A.

    1979-01-01

    The status of the NASA Solar Electric Propulsion System (SEPS) program is reviewed. The plans for SEPS definition and development include the initiation of the SEPS definition phase, the procurement for full-scale development in 1980, delivery of the SEPS for integration and tests with the comet rendezvous spacecraft in 1984, and a launch in 1985 that involves a flyby of Halley's comet in 1985 and a subsequent rendezvous with the comet Tempel 2 in 1988. In preparation for this, the acquisition process for SEPS has been initiated based on mission requirements rather than system requirements.

  19. Challenges with the introduction of radio-frequency identification systems into a manufacturer's supply chain - a pilot study

    NASA Astrophysics Data System (ADS)

    Kumar, Sameer; Kadow, Brooke B.; Lamkin, Melissa K.

    2011-05-01

    As radio-frequency identification (RFID) implementation becomes more widespread it is important for managers to consider if this technology is right for their businesses. This study examines challenges of RFID implementation along with a cost-benefit analysis of a pharmaceuticals manufacturer's supply chain. Research was gathered from a variety of sources on the topic of RFID to provide an in-depth analysis of challenges and benefits found with RFID systems. Furthermore, the study reviews the real case applications of the RFID technology in healthcare and customer services. Many of the challenges with RFID stem from improper planning of the synchronisation of the supply chain and the integration of RFID technology into facilities and software systems. Customer privacy, excess information and obsolete technology are also of concern to companies considering RFID. Benefits such as increased information sharing, product visibility and real-time information help to offset these challenges. In addition, pharmaceuticals manufacturer real case application showed cost savings from reducing labour and decreased opportunities for lost product counteract the expense to implement an RFID system. This study will be of value to managers who are attempting to implement RFID technology in their companies. It is intended that readers, both academics and practitioners, will be able to identify possible challenges and mitigate them as the RFID technology is put into practice.

  20. W-320, waste retrieval sluicing system: Operational start up plan

    SciTech Connect

    Bevins, R.R.

    1998-07-25

    This plan details the sequence of activities and identifies the organizational roles and responsibilities to ensure a safe startup of the Waste Retrieval Sluicing System (WRSS). This start up plan identifies the activities which must be performed during the initial startup as well as the document which directs each step. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this plan does not require a USQ screening.

  1. Customer system efficiency improvement assessment: Supply curves for transmission and distribution conservation options

    SciTech Connect

    Tepel, R.C.; Callaway, J.W.; De Steese, J.G.

    1987-11-01

    This report documents the results of Task 6 in the Customer System Efficiency Improvement (CSEI) Assessment Project. A principal objective of this project is to assess the potential for energy conservation in the transmission and distribution (TandD) systems of electric utilities in the BPA service area. The scope of this assessment covers BPA customers in the Pacific Northwest region and all non-federal TandD systems, including those that currently place no load on the BPA system. Supply curves were developed to describe the conservation resource potentially available from TandD-system efficiency improvements. These supply curves relate the levelized cost of upgrading existing equipment to the estimated amount of energy saved. Stated in this form, the resource represented by TandD loss reductions can be compared with other conservation options and regional electrical generation resources to determine the most cost-effective method of supplying power to the Pacific Northwest. The development of the supply curves required data acquisition and methodology development that are also described in this report. 11 refs., 11 figs., 16 tabs.

  2. Leveraging the LEDA high voltage power supply systems for the LANSCE refurbishment project

    SciTech Connect

    Bradley Iii, Joseph Thomas; Rees, Daniel E; Roybal, William T; Young, Karen A

    2008-01-01

    The LANSCE Refurbishment Project (LANSCE-R) will revitalize the LANSCE accelerator infrastructure. Much of the equipment has been in use for over 39 years and is approaching the end of its design lifetime. As obsolescence issues make like-for-like replacements increasingly more expensive, modern systems with lower costs become a reasonable alternative. As part of the LANSCE-R project, four of the seven HV power supplies for the 805 MHz RF klystrons will be replaced. The present and future requirements for these power supplies influence the selection of replacement options. Details of the HV power supply replacement requirements and the different replacement options will be discussed. One option is to use four 95 kV, 21 A DC power supplies originally installed nearby as part of the Low Energy Demonstration Accelerator (LEDA) project. Significant material and labor cost savings can be achieved by leaving these supplies installed where they are and building a HV transport system to bring high voltage power from the existing LEDA facility to the LANSCE facility. The different replacement options will be compared based on material and labor costs as offset by long-term energy savings.

  3. A new computer-controlled multi-channel high voltage supply system for GRACE instrumentation

    NASA Astrophysics Data System (ADS)

    Manna, A.; Chakrabarti, S.; Mukhopadhayay, P. K.

    2002-03-01

    The high energy gamma ray telescopes being set up by the Bhabha Atomic Research Institute Centre (BARC) at Mt. Abu, Rajasthan, as part of the GRACE project, require a very large number (~ 1000) of programmable high voltage power supplies for biasing photomultiplier tubes for the detection and characterization of the atmospheric Cerenkov events. These HV supplies need to be very compact, lightweight and rugged, as they will be mounted on the base of the moving telescope. This paper describes the design aspects of the overall HV system and the performance of the prototype HV modules developed for such applications. In the new design, the inverter switching frequency of the HV supplies has been increased threefold as compared to the earlier design, and surface mounted devices have been used to achieve overall size and weight reductions. The system consists of multiple HV modules, each containing 16 independently programmable HV supplies. Each HV module has an on-board micro-controller for doing control and supervisory functions and is interconnected via a serial 12C bus. The HV supplies have built in over voltage/current, thermal overload protections with output voltage readback and adjustable slew rate control facilities.

  4. Life cycle assessment for sustainable metropolitan water systems planning.

    PubMed

    Lundie, Sven; Peters, Gregory M; Beavis, Paul C

    2004-07-01

    Life Cycle Assessment (LCA) is useful as an information tool for the examination of alternative future scenarios for strategic planning. Developing a life cycle assessment for a large water and wastewater system involves making methodological decisions about the level of detail which is retained through different stages of the process. In this article we discuss a methodology tailored to strategic planning needs which retains a high degree of model segmentation in order to enhance modeling of a large, complex system. This is illustrated by a case study of Sydney Water, which is Australia's largest water service provider. A prospective LCA was carried out to examine the potential environmental impacts of Sydney Water's total operations in the year 2021. To our knowledge this is the first study to create an LCA model of an integrated water and wastewater system with this degree of complexity. A "base case" system model was constructed to represent current operating assets as augmented and upgraded to 2021. The base case results provided a basis for the comparison of alternative future scenarios and for conclusions to be drawn regarding potential environmental improvements. The scenarios can be roughly classified in two categories: (1) options which improve the environmental performance across all impact categories and (2) options which improve one indicator and worsen others. Overall environmental improvements are achieved in all categories by the scenarios examining increased demand management, energy efficiency, energy generation, and additional energy recovery from biosolids. The scenarios which examined desalination of seawater and the upgrades of major coastal sewage treatment plants to secondary and tertiary treatment produced an improvement in one environmental indicator but deteriorations in all the other impact categories, indicating the environmental tradeoffs within the system. The desalination scenario produced a significant increase in greenhouse gas

  5. IPPEX (Inspection Process Planning EXpert): An automated planning system for dimensional inspection

    SciTech Connect

    Brown, C.W.

    1990-04-01

    This paper discusses recent accomplishments obtained from development efforts of a generative dimensional inspection planning system. This system, APEX (Inspection Process Planning EXpert), is a knowledge-based system, currently being developed for the dimensional inspection of piece parts. This prototype system applies artificial intelligence techniques and implements an advanced product definition modeling system. The APEX framework is based on a functional architecture designed for the purpose of producing CMM inspection plans, inspection part programs, and support information. The current APEX prototype system selects the appropriate CMM, identifies the measurable surfaces, suggests probing point determination, performs inspection work element planning, and creates an initial DMIS (Dimensional Measurement Interface Specification) part program, all for a specific workpiece. The following describes the APEX system, its functional activities, system architecture, product definition and tolerance representation, inspection features, inspection work elements, hierarchical inspection task planning approach, dimensional inspection techniques, part program creation, user interfaces formats, and other issues related to integrated inspection planning and part programming for CMMs. Finally, this paper describes a system that advances the development of automated inspection planning, product modelling systems with application accessible dimensions and tolerances, and standard dimensional inspection techniques and methodologies.

  6. Planning Programming Budgeting Systems: PPBS and Education.

    ERIC Educational Resources Information Center

    Katzenbach, Edward L.

    Continuous change in education is requiring educational administrators to plan for the distant future with as much precision as they now do for the immediate future. Recently, major advances in the planning-budgeting process have become available to educators in the form of PPBS. Fiduciary budgets, which have been used in most schools since the…

  7. Optimal reconstruction of historical water supply to a distribution system: A. Methodology.

    PubMed

    Aral, M M; Guan, J; Maslia, M L; Sautner, J B; Gillig, R E; Reyes, J J; Williams, R C

    2004-09-01

    The New Jersey Department of Health and Senior Services (NJDHSS), with support from the Agency for Toxic Substances and Disease Registry (ATSDR) conducted an epidemiological study of childhood leukaemia and nervous system cancers that occurred in the period 1979 through 1996 in Dover Township, Ocean County, New Jersey. The epidemiological study explored a wide variety of possible risk factors, including environmental exposures. ATSDR and NJDHSS determined that completed human exposure pathways to groundwater contaminants occurred in the past through private and community water supplies (i.e. the water distribution system serving the area). To investigate this exposure, a model of the water distribution system was developed and calibrated through an extensive field investigation. The components of this water distribution system, such as number of pipes, number of tanks, and number of supply wells in the network, changed significantly over a 35-year period (1962--1996), the time frame established for the epidemiological study. Data on the historical management of this system was limited. Thus, it was necessary to investigate alternative ways to reconstruct the operation of the system and test the sensitivity of the system to various alternative operations. Manual reconstruction of the historical water supply to the system in order to provide this sensitivity analysis was time-consuming and labour intensive, given the complexity of the system and the time constraints imposed on the study. To address these issues, the problem was formulated as an optimization problem, where it was assumed that the water distribution system was operated in an optimum manner at all times to satisfy the constraints in the system. The solution to the optimization problem provided the historical water supply strategy in a consistent manner for each month of the study period. The non-uniqueness of the selected historical water supply strategy was addressed by the formulation of a second

  8. Air quality and future energy system planning

    NASA Astrophysics Data System (ADS)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    energy system planning. Some example applications of this work are: (1) to discover conflicts and synergies between air quality regulations and future developments in the energy system and land use change; (2) to show the drivers of air quality in a given spatial context; (3) to explore effective ways to visualize impacts of different energy, land use and emissions control policies on air quality. An initial test case for the Bay Area in California will be presented, extending the scope of the existing California ForeseerTM tool to identify impacts of different policies within the water-energy-land nexus on local air quality.

  9. Situational planning of production processes in a flexible automated production system

    NASA Astrophysics Data System (ADS)

    Solomentsev, Y. M.; Basin, A. M.; Klimov, S. V.

    1984-11-01

    The introduction of flexible automated production systems (GAPS) that reduce the number of machine tool workers and the product fabrication time also necessitates fundamentally new approaches to production process planning. A proposed situational planning system (SIP) that takes full advantage of the capabilities of GAPS is analyzed. The SIP system is a component of the automated control system for the GAPS, which in turn is subordinate to an integrated automated planning design and production engineering system. Depending on the production situation, requests are fed to the SIP system from the automated production process control system. Data on the production situation are also supplied simultaneously to the SIP system along with the request. Only the production limitations are fed into the SIP system, i.e., to the automated control system for the GAPS, where these limitations include production process limitations as well as the organizational limitations. Information on the fabrication routing and the composition of the operations is generated by the SIP system, i.e., by the automated control system for the GAPS itself in real time. Thus, both the routing and composition of an operation become flexible, while the control systems for the GAPS system becomes more intelligent.

  10. Geographic information system based manure application plan.

    PubMed

    Basnet, Badri B; Apan, Armando A; Raine, Steven R

    2002-02-01

    A geographic information system (GIS) based manure application plan has been developed for the site-specific application of animal waste to agricultural fields in the Westbrook sub-catchment of the Murray-Darling Basin, south-east Queensland, Australia. Sites suitable for animal waste application were identified using a GIS based weighted linear combination (WLC) model. The degree of land suitability for animal waste application was determined using a range of social, economic, environmental, and agricultural factors. As eutrophication and toxic blue-green algae blooms are a known problem in the catchment, the manure application rates were limited to the rate of crop phosphorus removal. Maximum manure application rate was calculated spatially by taking the crop nutrient (P2O5) requirement and the manure nutrient (P2O5) content into account. The environmental suitability of the fields receiving animal waste was considered in prescribing the final application rate of solid and liquid manures generated by local animal production facilities. The degree of site suitability of the agricultural fields was also used to suggest manure management practices to minimise the socio-environmental risks and increase the nutrient use efficiency of the applied manure. The amount of ammonium nitrogen (NH4-N) that would be added to the soil by satisfying the P2O5 requirement using manure sources was also calculated and an applied NH4-N map was created. This map could be used to assist farmers identify additional nitrogen requirements after manure application. PMID:11995243

  11. Electrically rechargeable anionically active reduction-oxidation electrical storage-supply system

    SciTech Connect

    Remick, R.J.; Ang, P.G.P.

    1984-11-27

    An electrically rechargeable anionically active reduction-oxidation electric storage-supply system and process is disclosed using a sodium or potassium sulfidepolysulfide anolyte reaction and an iodide-polyiodide, chloride-chlorine or bromide-bromine species catholyte reaction. The catholyte and anolyte are separated by an ion selective membrane permeable to positive sodium and potassium ions and substantially impermeable to negative bromide, chloride, iodide, sulfide and polysulfide ions. A flowing electrolyte system is disclosed with external electrolyte storage vessels. The apparatus and process provide an electrically rechargeable anionically active reduction-oxidation system in which the electrolytes may be maintained at near neutral or slightly basic pH, with virtually no parasitic side reactions upon charging, such as hydrogen or oxygen evolution, and the disclosed storage and supply system provides higher energy densities than referenced prior art systems.

  12. Power supply sharing in the Apollo telescope mount electrical power system

    NASA Technical Reports Server (NTRS)

    Lanier, R., Jr.; Kapustka, R.

    1977-01-01

    A modular dc power supply power sharing technique was developed for the Apollo telescope mount electrical power sytem on Skylab. The advantages and disadvantages of various techniques used are reviewed and compared. The new technique design is discussed, and results of its implementation in the power system are reviewed.

  13. A Survey of Teacher Supply and Demand Data Collection Systems in NASDTEC Central Region States.

    ERIC Educational Resources Information Center

    Roth, Robert A.

    The Central Region States of the National Association of State Directors of Teacher Education and Certification (NASDTEC) were surveyed in 1980 regarding their systems for collecting information and their information needs on teacher supply and demand. The 13 states involved were Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Missouri,…

  14. Workshop on the Design of Sustainable Product Systems and Supply Chains; Final Report,

    EPA Science Inventory

    ABOUT THE WORKSHOP The Workshop on the Design of Sustainable Product Systems and Supply Chains was held September 12–13, 2011 at the U.S. National Science Foundation (NSF) offices in Arlington, Virginia. The Workshop was co-sponsored by the U.S. Environmental Protection Agency (...

  15. Strengthening Carrying Capacity of a Water Supply System under Climate Change with the Drought Early Warning System

    NASA Astrophysics Data System (ADS)

    Huang, Syujie; Liu, Tzuming; Li, Minghsu; Tung, Chingpin

    2016-04-01

    The carrying capacity of a water supply system is the maximal probable water supply amount under an acceptable risk which is related to the systematic combination of hydrology conditions, climatic conditions, and water infrastructures, for instance, reservoirs, weirs, and water treatment plants. Due to long-term imbalance of water supply and demand during the drought seasons, the carrying capacity of a water supply system may be affected gradually with more extreme climate events resulting from the climate change. To evaluate the carrying capacity of the water supply system under climate change, three major steps to build adaptation capacity under climate change are adopted, including problem identification and goal setting, current risk assessment, and future risk assessment. The carrying capacities for current climate condition and future climate condition were estimated respectively. The early warning system was taken as the effective measure to strengthen the carrying capacity for the uncertain changing climate. The water supply system of Chuoshui River basin in Taiwan is used as the case study. The system dynamics modeling software, Vensim, was used to build the water resources allocation model for Chuoshui River basin. To apply the seasonal climate forecasts released from Taiwan Central Weather Bureau (CWB) on modeling, a weather generator is adopted to generate daily weather data for the input of the hydrological component of GWLF model, to project inflows with the lead time of three months. Consequently, the water shortages with and without a drought early warning system were estimated to evaluate the effectiveness of a drought early warning system under climate change. Keywords: Climate change, Carrying capacity, Risk Assessment, Seasonal Climate Forecasts, Drought Early Warning System

  16. Performance of current measurement system in poloidal field power supply for Experimental Advanced Superconducting Tokamak

    NASA Astrophysics Data System (ADS)

    Liu, D. M.; Li, J.; Wan, B. N.; Lu, Z.; Wang, L. S.; Jiang, L.; Lu, C. H.; Huang, J.

    2016-11-01

    As one of the core subsystems of the Experimental Advanced Superconducting Tokamak (EAST), the poloidal field power system supplies energy to EAST's superconducting coils. To measure the converter current in the poloidal field power system, a current measurement system has been designed. The proposed measurement system is composed of a Rogowski coil and a newly designed integrator. The results of the resistor-inductor-capacitor discharge test and the converter equal current test show that the current measurement system provides good reliability and stability, and the maximum error of the proposed system is less than 1%.

  17. An optimal operational advisory system for a brewery's energy supply plant

    SciTech Connect

    Ito, K.; Shiba, T.; Yokoyama, R. . Dept. of Energy Systems Engineering); Sakashita, S. . Mayekawa Energy Management Research Center)

    1994-03-01

    An optimal operational advisory system is proposed to operate rationally a brewery's energy supply plant from the economical viewpoint. A mixed-integer linear programming problem is formulated so as to minimize the daily operational cost subject to constraints such as equipment performance characteristics, energy supply-demand relations, and some practical operational restrictions. This problem includes lots of unknown variables and a hierarchical approach is adopted to derive numerical solutions. The optimal solution obtained by this methods is indicated to the plant operators so as to support their decision making. Through the numerical study for a real brewery plant, the possibility of saving operational cost is ascertained.

  18. [Advances and challenges of the Unified Health System planning].

    PubMed

    Vieira, Fabíola Sulpino

    2009-10-01

    Since the Unified Health System creation, managers have been expending efforts to discuss the planning and, made attempts to institutionalize it, considering that it's a basic management component. However, despite advances obtained, there are aspects that are priorities and that constitute challenges for the institutionalization of the planning at the Unified Health System. In this direction, this study describes the planning evolution in the system, by legal and technician material analysis of published documents by Ministry of Health. From the planning conception in these publications, it leads a reflection on the used approach, considering the established management instruments, and its entailing to the more currently accepted theory and methodology of health planning. Aspects that need to be observed are pointed for the effectiveness to ascendant planning at the Unified Health System.

  19. Using Many-Objective Optimization and Robust Decision Making to Identify Robust Regional Water Resource System Plans

    NASA Astrophysics Data System (ADS)

    Matrosov, E. S.; Huskova, I.; Harou, J. J.

    2015-12-01

    Water resource system planning regulations are increasingly requiring potential plans to be robust, i.e., perform well over a wide range of possible future conditions. Robust Decision Making (RDM) has shown success in aiding the development of robust plans under conditions of 'deep' uncertainty. Under RDM, decision makers iteratively improve the robustness of a candidate plan (or plans) by quantifying its vulnerabilities to future uncertain inputs and proposing ameliorations. RDM requires planners to have an initial candidate plan. However, if the initial plan is far from robust, it may take several iterations before planners are satisfied with its performance across the wide range of conditions. Identifying an initial candidate plan is further complicated if many possible alternative plans exist and if performance is assessed against multiple conflicting criteria. Planners may benefit from considering a plan that already balances multiple performance criteria and provides some level of robustness before the first RDM iteration. In this study we use many-objective evolutionary optimization to identify promising plans before undertaking RDM. This is done for a very large regional planning problem spanning the service area of four major water utilities in East England. The five-objective optimization is performed under an ensemble of twelve uncertainty scenarios to ensure the Pareto-approximate plans exhibit an initial level of robustness. New supply interventions include two reservoirs, one aquifer recharge and recovery scheme, two transfers from an existing reservoir, five reuse and five desalination schemes. Each option can potentially supply multiple demands at varying capacities resulting in 38 unique decisions. Four candidate portfolios were selected using trade-off visualization with the involved utilities. The performance of these plans was compared under a wider range of possible scenarios. The most balanced plan was then submitted into the vulnerability

  20. Harnessing the Risk-Related Data Supply Chain: An Information Architecture Approach to Enriching Human System Research and Operations Knowledge

    NASA Technical Reports Server (NTRS)

    Buquo, Lynn; Johnson-Throop, Kathy

    2010-01-01

    NASA's Human Research Program (HRP) and Space Life Sciences Directorate (SLSD), not unlike many NASA organizations today, struggle with the inherent inefficiencies caused by dependencies on heterogeneous data systems and silos of data and information spread across decentralized discipline domains. The capture of operational and research-based data/information (both in-flight and ground-based) in disparate IT systems impedes the extent to which that data/information can be efficiently and securely shared, analyzed, and enriched into knowledge that directly and more rapidly supports HRP's research-focused human system risk mitigation efforts and SLSD s operationally oriented risk management efforts. As a result, an integrated effort is underway to more fully understand and document how specific sets of risk-related data/information are generated and used and in what IT systems that data/information currently resides. By mapping the risk-related data flow from raw data to useable information and knowledge (think of it as the data supply chain), HRP and SLSD are building an information architecture plan to leverage their existing, shared IT infrastructure. In addition, it is important to create a centralized structured tool to represent risks including attributes such as likelihood, consequence, contributing factors, and the evidence supporting the information in all these fields. Representing the risks in this way enables reasoning about the risks, e.g. revisiting a risk assessment when a mitigation strategy is unavailable, updating a risk assessment when new information becomes available, etc. Such a system also provides a concise way to communicate the risks both within the organization as well as with collaborators. Understanding and, hence, harnessing the human system risk-related data supply chain enhances both organizations' abilities to securely collect, integrate, and share data assets that improve human system research and operations.

  1. Comparing Supply-Side Specifications in Models of Global Agriculture and the Food System

    SciTech Connect

    Robinson, Sherman; van Meijl, Hans; Willenbockel, Dirk; Valin, Hugo; Fujimori, Shinichiro; Masui, Toshihiko; Sands, Ronald; Wise, Marshall A.; Calvin, Katherine V.; Havlik, Petr; Mason d'Croz, Daniel; Tabeau, Andrzej; Kavallari, Aikaterini; Schmitz, Christoph; Dietrich, Jan P.; von Lampe, Martin

    2014-01-01

    This paper compares the theoretical specification of production and technical change across the partial equilibrium (PE) and computable general equilibrium (CGE) models of the global agricultural and food system included in the AgMIP model comparison study. The two modeling approaches have different theoretical underpinnings concerning the scope of economic activity they capture and how they represent technology and the behavior of supply and demand in markets. This paper focuses on their different specifications of technology and supply behavior, comparing their theoretical and empirical treatments. While the models differ widely in their specifications of technology, both within and between the PE and CGE classes of models, we find that the theoretical responsiveness of supply to changes in prices can be similar, depending on parameter choices that define the behavior of supply functions over the domain of applicability defined by the common scenarios used in the AgMIP comparisons. In particular, we compare the theoretical specification of supply in CGE models with neoclassical production functions and PE models that focus on land and crop yields in agriculture. In practice, however, comparability of results given parameter choices is an empirical question, and the models differ in their sensitivity to variations in specification. To illustrate the issues, sensitivity analysis is done with one global CGE model, MAGNET, to indicate how the results vary with different specification of technical change, and how they compare with the results from PE models.

  2. Lean production in improving supply chain performance through hybrid model SCOR 11.0 - system dynamics

    NASA Astrophysics Data System (ADS)

    Saleh, Chairul; Fatcha Mubiena, Ghaida; Immawan, Taufiq; Hassan, Azmi

    2016-02-01

    Supply Chain Operation Reference (SCOR) is a method to measure supply chain serving the business process framework, performance indicators and unique technologies to support communication and collaboration among supply chain partners. The objective of this paper is to measure Supply Chain Management performance by using SCOR version 11.0 for production typology of MTS-MTO in Indonesian Batik Industry. This research combines SCOR's model and System Dynamics in order to predict the complex activities on batik industry. The hybrid SCOR-SD could identify the interaction among five attributes with the associated variables simultaneously. The results are obtained after the performance of lean production application is increased and the targets are achieved, even exceeding the target. For reliability attributes that associated with perfect order fulfilment started from 2015 to 2019 respectively are calculated as 80.06%, 103.53%, 105.58%, 93.76%, and 72.17%. Responsiveness attributes associated with the order fulfilment cycle time, respectively 122.45%, 149.10%, 159.26%, 131.53%, and 119.36%. Attributes associated with the total cost of service charge respectively 93.46%, 93.53%, 93.45%, 93.49, and 93.49%. Attributes associated with cash management assets to cash cycle time in a row were 160%, 153%, 146.3%, 150%, and 126.7%. The latter attribute is agility attributes associated with supply chain flexibility upside respectively 100%, 87.2%, 100%, 82%, and 82%.

  3. Critique of the mid-range energy forecasting, system oil and gas supply models

    SciTech Connect

    Patton, W.P.

    1980-10-01

    The Mid-Range Energy Forecasting System (MEFS) is a model used by the Department of Energy to forecast domestic production, consumption and price for conventional energy sources on a regional basis over a period of 5 to 15 years. Among the energy sources included in the model are oil, gas and other petroleum fuels, coal, uranium, and electricity. Final consumption of alternative energy sources is broken into end-use categories, such as residential, commercial and industrial uses. Regional prices for all energy sources are calculated by iteratively equating domestic supply and demand. The purpose of this paper is to assess the ability of the Oil and Gas Supply Submodels of MEFS to reliably and accurately project oil and gas supply curves, which are used in the integrating model, along with fuel demand curves to estimate market price. The reliability and accuracy of the oil and gas model cannot be judged by comparing its predictions against actual observations because those observations have not yet occurred. The reliability and reasonableness of the oil and gas supply model can be judged, however, by analyzing how well its assumptions and predictions correspond to accepted economic principles. This is the approach taken in this critique. The remainder of this paper describes the general structure of the oil and gas supply model and how it functions to project the quantity of oil and gas forthcoming at given prices in a particular year, then discusses the economic soundness of the model, and finally suggests model changes to improve its performance.

  4. Creation of Integrated System of Cosmonauts Sanitary-Hygienic Supply: Researches, Problems and Prospects

    NASA Astrophysics Data System (ADS)

    Shumilina, I.; Krivobok, S.; Shumilina, G.

    The necessity of Integrated System creation for cosmonauts Sanitary - Hygienic Supply has appeared at realization of joint flights on the International Space Station (ISS). Russian hygiene means manufactured and tested in the long space flights conditions and personal hygiene means of foreign manufacture, which were developed without chamber experiments conditions, are mean to use for Integrated System. The realization of Sanitary - Hygienic Water (SHW) regeneration is supposed for water circulation. The researches directed on equipment creation for clothing washing and clothing drying were carried out for the purposes of goods turnover optimization on ISS The variants of possible realization of water procedures (shower-bath, face washing) are studied. New and essentially date are received for an estimation of efficiency of various ways of cosmonauts Sanitary - Hygienic Supply, including results of tests for new generation regeneration SHW systems with Nanofiltration unit on various kinds real SHW. The improvement of washing-up liquids, individual selection of a complex of personal hygiene means with the man skin condition registration allows to raise of preventive measures use efficiency directed on prevention of adverse skin changes and skin diseases. The analysis of the equipment and methods for clothing washing and clothing drying for conditions of long space flight are carried out. The experimental data on textile materials drying are received. The investigations covered a wide range of issues associated with Sanitary - Hygienic Supply Integrated System including Personal Hygiene complex (items and techniques), ways of Sanitary - Hygienic Supply realization, methods of wastewater regeneration. The results of researches are especially urgent for cosmonauts Sanitary - Hygienic Supply System creation for long space flights, in particular, "Mars" flights at impossibility of updating of water stock, clothing stock etc.

  5. A Power-Efficient Wireless System With Adaptive Supply Control for Deep Brain Stimulation.

    PubMed

    Lee, Hyung-Min; Park, Hangue; Ghovanloo, Maysam

    2013-09-01

    A power-efficient wireless stimulating system for a head-mounted deep brain stimulator (DBS) is presented. A new adaptive rectifier generates a variable DC supply voltage from a constant AC power carrier utilizing phase control feedback, while achieving high AC-DC power conversion efficiency (PCE) through active synchronous switching. A current-controlled stimulator adopts closed-loop supply control to automatically adjust the stimulation compliance voltage by detecting stimulation site potentials through a voltage readout channel, and improve the stimulation efficiency. The stimulator also utilizes closed-loop active charge balancing to maintain the residual charge at each site within a safe limit, while receiving the stimulation parameters wirelessly from the amplitude-shift-keyed power carrier. A 4-ch wireless stimulating system prototype was fabricated in a 0.5-μm 3M2P standard CMOS process, occupying 2.25 mm². With 5 V peak AC input at 2 MHz, the adaptive rectifier provides an adjustable DC output between 2.5 V and 4.6 V at 2.8 mA loading, resulting in measured PCE of 72 ~ 87%. The adaptive supply control increases the stimulation efficiency up to 30% higher than a fixed supply voltage to 58 ~ 68%. The prototype wireless stimulating system was verified in vitro. PMID:24678126

  6. A Power-Efficient Wireless System With Adaptive Supply Control for Deep Brain Stimulation

    PubMed Central

    Lee, Hyung-Min; Park, Hangue; Ghovanloo, Maysam

    2014-01-01

    A power-efficient wireless stimulating system for a head-mounted deep brain stimulator (DBS) is presented. A new adaptive rectifier generates a variable DC supply voltage from a constant AC power carrier utilizing phase control feedback, while achieving high AC-DC power conversion efficiency (PCE) through active synchronous switching. A current-controlled stimulator adopts closed-loop supply control to automatically adjust the stimulation compliance voltage by detecting stimulation site potentials through a voltage readout channel, and improve the stimulation efficiency. The stimulator also utilizes closed-loop active charge balancing to maintain the residual charge at each site within a safe limit, while receiving the stimulation parameters wirelessly from the amplitude-shift-keyed power carrier. A 4-ch wireless stimulating system prototype was fabricated in a 0.5-μm 3M2P standard CMOS process, occupying 2.25 mm². With 5 V peak AC input at 2 MHz, the adaptive rectifier provides an adjustable DC output between 2.5 V and 4.6 V at 2.8 mA loading, resulting in measured PCE of 72 ~ 87%. The adaptive supply control increases the stimulation efficiency up to 30% higher than a fixed supply voltage to 58 ~ 68%. The prototype wireless stimulating system was verified in vitro. PMID:24678126

  7. [Surveillance of drinking water supply systems on markets and in vehicles].

    PubMed

    Rädel, U; Puchert, W; Suchenwirth, R

    2007-03-01

    The new German Drinking Water Ordinance (TrinkwV 2001) demands that the requirements of water intended for human consumption be met up to the intrinsic tap, at which the water is used. This also applies to water supply systems for food trade aboard non-stationary facilities and in vehicles for commercial purposes. In contrast to stationary units for drinking water supply, the nonstationary units relocate and the responsibility changes with each public health authority agent. Therefore, a coordinated action between the federal states is desirable and necessary. The experience of the public health departments presents many non-compliant parameters of microbiology in water supply systems on markets and in vehicles. The development of practical and consistent recommendations for the surveillance of non-stationary units is required to give consistent standards to the users. The article gives a review about legal foundations and technical rules in order to define the drinking water supply systems on markets and in vehicles in compliance with the German Drinking Water Ordinance. Examples of laboratory results from different monitoring episodes from three federal states are shown.

  8. Magnetic susceptibility well-logging unit with single power supply thermoregulation system

    SciTech Connect

    Seeley, R. L.

    1985-11-05

    The magnetic susceptibility well-logging unit with single power supply thermoregulation system provides power from a single surface power supply over a well-logging cable to an integrated circuit voltage regulator system downhole. This voltage regulator system supplies regulated voltages to a temperature control system and also to a Maxwell bridge sensing unit which includes the solenoid of a magnetic susceptibility probe. The temperature control system is provided with power from the voltage regulator system and operates to permit one of several predetermined temperatures to be chosen, and then operates to maintain the solenoid of a magnetic susceptibility probe at this chosen temperature. The temperature control system responds to a temperature sensor mounted upon the probe solenoid to cause resistance heaters concentrically spaced from the probe solenoid to maintain the chosen temperature. A second temperature sensor on the probe solenoid provides a temperature signal to a temperature transmitting unit, which initially converts the sensed temperature to a representative voltage. This voltage is then converted to a representative current signal which is transmitted by current telemetry over the well logging cable to a surface electronic unit which then reconverts the current signal to a voltage signal.

  9. Design of Instantaneous High Power Supply System with power distribution management for portable military devices

    NASA Astrophysics Data System (ADS)

    Kwak, Kiho; Kwak, Dongmin; Yoon, Joohong

    2015-08-01

    A design of an Instantaneous High Power Supply System (IHPSS) with a power distribution management (PDM) for portable military devices is newly addressed. The system includes a power board and a hybrid battery that can not only supply instantaneous high power but also maintain stable operation at critical low temperature (-30 °C). The power leakage and battery overcharge are effectively prevented by the optimal PDM. The performance of the proposed system under the required pulse loads and the operating conditions of a Korean Advanced Combat Rifle employed in the battlefield is modeled with simulations and verified experimentally. The system with the IHPSS charged the fuse setter with 1.7 times higher voltage (8.6 V) than the one without (5.4 V) under the pulse discharging rate (1 A at 0.5 duty, 1 ms) for 500 ms.

  10. Design of a management support system for hospital strategic planning.

    PubMed

    Applegate, L M; Mason, R O; Thorpe, D

    1986-02-01

    Recent changes in the health care industry that foster competition are drastically affecting hospital planning and marketing activities. Increased price competition, the development of less costly alternative health care delivery systems and providers, and the shift to prospective average-cost reimbursement for Medicare beneficiaries are major factors promoting a new emphasis on strategic hospital planning. Hospital information systems do not currently support the sophisticated data-collection and analysis requirements that will be needed to implement strategic planning activities. New data must be collected and old data must be analyzed and stored in new ways. New hospital information systems designs are needed to cope with the change in the economic structure of the health care industry and its effects on hospital information needs. This paper proposes a system design for a management support system that will assist hospital administrators and planners in analyzing internal organizational data and external industry data to develop strategic planning objectives, strategies, and business plans. Analysis of the structure and process of hospital strategic planning was performed to identify the information needs of hospital planners. A prototype system is currently being implemented at the University of Arizona. The system provides an integrating framework for data base management systems, executive information systems, model management systems, and dialogue management systems. Objective analytical models and subjective strategic planning models are available to assist with idea structuring and decision processing. PMID:3522794

  11. Servicers system demonstration plan and capability development

    NASA Technical Reports Server (NTRS)

    Bulboaca, M. A.; Cuseo, J. A.; Derocher, W. L., Jr.; Maples, R. W.; Reynolds, P. C.; Sterrett, R. A.

    1985-01-01

    A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.

  12. Design of a 60 T Quasi-continuous Magnetic Field System with a Hybrid Capacitor/Rectifier Power Supply

    NASA Astrophysics Data System (ADS)

    Li, H.; Ding, H. F.; Peng, T.; Xiao, H. X.; Jiang, C. X.

    2013-03-01

    At the Wuhan National High Magnetic Field Center, a 135 MW rectifier power supply is being installed nearby a 11 MJ capacitor bank power supply. By combining the two power supplies, a 60 T / 100 ms quasi-continuous magnetic field can be achieved in a monolithic copper coil magnet with a 22 mm diameter bore. Comsol Multiphysics 3.5a and Matlab 7.11.0 were adopted to verify the performance of the magnet and the hybrid power supply system. Details of the designed magnet, the power supply and the simulation results are presented.

  13. Dynamic investigation of PEFC stacks in interaction with the air supply system

    NASA Astrophysics Data System (ADS)

    Philipps, F.; Simons, G.; Schiefer, K.

    This paper explores the behaviour of a dynamically operated fuel cell system regarding to an automotive application, examining the air supply and their interaction with the fuel cell stacks. The dynamic limits of stack operation are also discussed. Finally, the paper provides a description of the test facility used in these investigations. The research of dynamically operated fuel cell stacks shows that in order to achieve high energy efficiency, a power-dependent modulation of the pressure and flow rate of the air supply is necessary. A test facility designed for energy management and power train research (up to 42 kW) was used for the experiment. A number of 11.5 kW fuel cell stacks was examined experimentally with respect to performance in interaction with the air supply in stationary and dynamic operation. The stacks were tested individually and in parallel. All of them were operated "dead-end" on the hydrogen side. Experimental results varying the parameters and load curves applied to the air supply system are given in the paper. The results show different dynamic behaviours between the stacks and a substantial difference in efficiency and dynamic response of the fuel cell system operated with different strategies. The results of different operating strategies for fuel cell systems, with respect to the interaction between the fuel cell stack and the air supply and in their dependency on air mass flow and pressure level are presented. The examinations were done with the test facility using real current demand profile of the experimental car HyLite ® from zero to full load and the New European Drive Cycle (NEDC).

  14. Succession Planning in a Two-Year Technical College System

    ERIC Educational Resources Information Center

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  15. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... shall require the rail transit agency to implement a system security plan that, at a minimum, complies... must be developed and maintained as a separate document and may not be part of the rail transit agency's system safety program plan. (b) The oversight agency may prohibit a rail transit agency...

  16. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... shall require the rail transit agency to implement a system security plan that, at a minimum, complies... must be developed and maintained as a separate document and may not be part of the rail transit agency's system safety program plan. (b) The oversight agency may prohibit a rail transit agency...

  17. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... shall require the rail transit agency to implement a system security plan that, at a minimum, complies... must be developed and maintained as a separate document and may not be part of the rail transit agency's system safety program plan. (b) The oversight agency may prohibit a rail transit agency...

  18. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... shall require the rail transit agency to implement a system security plan that, at a minimum, complies... must be developed and maintained as a separate document and may not be part of the rail transit agency's system safety program plan. (b) The oversight agency may prohibit a rail transit agency...

  19. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... shall require the rail transit agency to implement a system security plan that, at a minimum, complies... must be developed and maintained as a separate document and may not be part of the rail transit agency's system safety program plan. (b) The oversight agency may prohibit a rail transit agency...

  20. Information security management system planning for CBRN facilities

    SciTech Connect

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  1. Dosimetry audit of radiotherapy treatment planning systems.

    PubMed

    Bulski, Wojciech; Chełmiński, Krzysztof; Rostkowska, Joanna

    2015-07-01

    In radiotherapy Treatment Planning Systems (TPS) various calculation algorithms are used. The accuracy of dose calculations has to be verified. Numerous phantom types, detectors and measurement methodologies are proposed to verify the TPS calculations with dosimetric measurements. A heterogeneous slab phantom has been designed within a Coordinated Research Project (CRP) of the IAEA. The heterogeneous phantom was developed in the frame of the IAEA CRP. The phantom consists of frame slabs made with polystyrene and exchangeable inhomogeneity slabs equivalent to bone or lung tissue. Special inserts allow to position thermoluminescent dosimeters (TLD) capsules within the polystyrene slabs below the bone or lung equivalent slabs and also within the lung equivalent material. Additionally, there are inserts that allow to position films or ionisation chamber in the phantom. Ten Polish radiotherapy centres (of 30 in total) were audited during on-site visits. Six different TPSs and five calculation algorithms were examined in the presence of inhomogeneities. Generally, most of the results from TLD were within 5 % tolerance. Differences between doses calculated by TPSs and measured with TLD did not exceed 4 % for bone and polystyrene equivalent materials. Under the lung equivalent material, on the beam axis the differences were lower than 5 %, whereas inside the lung equivalent material, off the beam axis, in some cases they were of around 7 %. The TLD results were confirmed with the ionisation chamber measurements. The comparison results of the calculations and the measurements allow to detect limitations of TPS calculation algorithms. The audits performed with the use of heterogeneous phantom and TLD seem to be an effective tool for detecting the limitations in the TPS performance or beam configuration errors at audited radiotherapy departments.

  2. Advanced Building Efficiency Testbed Initiative/Intelligent Workplace Energy Supply System; ABETI/IWESS

    SciTech Connect

    David Archer; Frederik Betz; Yun Gu; Rong Li; Flore Marion; Sophie Masson; Ming Qu; Viraj Srivastava; Hongxi Yin; Chaoqin Zhai; Rui Zhang; Elisabeth Aslanian; Berangere Lartigue

    2008-05-31

    ABETI/IWESS is a project carried out by Carnegie Mellon's Center for Building Performance and Diagnostics, the CBPD, supported by the U.S. Department of Energy/EERE, to design, procure, install, operate, and evaluate an energy supply system, an ESS, that will provide power, cooling, heating and ventilation for CBPD's Intelligent Workplace, the IW. The energy sources for this system, the IWESS, are solar radiation and bioDiesel fuel. The components of this overall system are: (1) a solar driven cooling and heating system for the IW comprising solar receivers, an absorption chiller, heat recovery exchanger, and circulation pump; (2) a bioDiesel fueled engine generator with heat recovery exchangers, one on the exhaust to provide steam and the other on the engine coolant to provide heated water; (3) a ventilation system including an enthalpy recovery wheel, an air based heat pump, an active desiccant wheel, and an air circulation fan; and (4) various convective and radiant cooling/heating units and ventilation air diffusers distributed throughout the IW. The goal of the ABETI/IWESS project is to demonstrate an energy supply system for a building space that will provide a healthy, comfortable environment for the occupants and that will reduce the quantity of energy consumed in the operation of a building space by a factor of 2 less than that of a conventional energy supply for power, cooling, heating, and ventilation based on utility power and natural gas fuel for heating.

  3. Policy challenges for the pediatric rheumatology workforce: Part II. Health care system delivery and workforce supply

    PubMed Central

    2011-01-01

    The United States pediatric population with chronic health conditions is expanding. Currently, this demographic comprises 12-18% of the American child and youth population. Affected children often receive fragmented, uncoordinated care. Overall, the American health care delivery system produces modest outcomes for this population. Poor, uninsured and minority children may be at increased risk for inferior coordination of services. Further, the United States health care delivery system is primarily organized for the diagnosis and treatment of acute conditions. For pediatric patients with chronic health conditions, the typical acute problem-oriented visit actually serves as a barrier to care. The biomedical model of patient education prevails, characterized by unilateral transfer of medical information. However, the evidence basis for improvement in disease outcomes supports the use of the chronic care model, initially proposed by Dr. Edward Wagner. Six inter-related elements distinguish the success of the chronic care model, which include self-management support and care coordination by a prepared, proactive team. United States health care lacks a coherent policy direction for the management of high cost chronic conditions, including rheumatic diseases. A fundamental restructure of United States health care delivery must urgently occur which places the patient at the center of care. For the pediatric rheumatology workforce, reimbursement policies and the actions of health plans and insurers are consistent barriers to chronic disease improvement. United States reimbursement policy and overall fragmentation of health care services pose specific challenges for widespread implementation of the chronic care model. Team-based multidisciplinary care, care coordination and self-management are integral to improve outcomes. Pediatric rheumatology demand in the United States far exceeds available workforce supply. This article reviews the career choice decision-making process

  4. Career Planning and Computer-Based Systems: Models of Integration.

    ERIC Educational Resources Information Center

    Harris-Bowlsbey, JoAnn

    1995-01-01

    Discusses developments in computer applications in guidance and counseling, specifically the information systems and career planning emphasis systems available to counselors and their use with clients in individual or group career counseling and education. (LKS)

  5. Reconciling Scale Mismatch in Water Governance, Hydro-climatic Processes and Infrastructure Systems of Water Supply in Las Vegas

    NASA Astrophysics Data System (ADS)

    Garcia, M. E.; Alarcon, T.; Portney, K.; Islam, S.

    2013-12-01

    Water resource systems are a classic example of a common pool resource due to the high cost of exclusion and the subtractability of the resource; for common pool resources, the performance of governance systems primarily depends on how well matched the institutional arrangements and rules are to the biophysical conditions and social norms. Changes in water governance, hydro-climatic processes and infrastructure systems occur on disparate temporal and spatial scales. A key challenge is the gap between current climate change model resolution, and the spatial and temporal scale of urban water supply decisions. This gap will lead to inappropriate management policies if not mediated through a carefully crafted decision making process. Traditional decision support and planning methods (DSPM) such as classical decision analysis are not equipped to deal with a non-static climate. While emerging methods such as decision scaling, robust decision making and real options are designed to deal with a changing climate, governance systems have evolved under the assumption of a static climate and it is not clear if these methods are well suited to the existing governance regime. In our study, these questions are contextualized by examining an urban water utility that has made significant changes in policy to adapt to changing conditions: the Southern Nevada Water Authority (SNWA) which serves metropolitan Las Vegas. Like most desert cities, Las Vegas exists because of water; the artesian springs of the Las Vegas Valley once provided an ample water supply for Native Americans, ranchers and later a small railroad city. However, population growth has increased demands far beyond local supplies. The area now depends on the Colorado River for the majority of its water supply. Natural climate variability with periodic droughts has further challenged water providers; projected climate changes and further population growth will exacerbate these challenges. Las Vegas is selected as a case

  6. Vocational E.S.P. Planning System. Planning Vocational Education for Special Populations.

    ERIC Educational Resources Information Center

    Drewes, Donald W.; And Others

    This guide for implementing the Vocational Education for Special Populations (ESP) Planning System is designed to assist states in modifying their planning procedures to be more responsive to the needs of special populations. Chapter 1 briefly describes the historical evolution of the concern for those with special needs and the emergence of…

  7. Internal electrolyte supply system for reliable transport throughout fuel cell stacks

    DOEpatents

    Wright, Maynard K.; Downs, Robert E.; King, Robert B.

    1988-01-01

    An improved internal electrolyte supply system in a fuel cell stack employs a variety of arrangements of grooves and passages in bipolar plates of the multiplicity of repeating fuel cells to route gravity-assisted flowing electrolyte throughout the stack. The grooves route electrolyte flow along series of first paths which extend horizontally through the cells between the plates thereof. The passages route electrolyte flow along series of second paths which extend vertically through the stack so as to supply electrolyte to the first paths in order to expose the electrolyte to the matrices of the cells. Five different embodiments of the supply system are disclosed. Some embodiments employ wicks in the grooves for facilitating transfer of the electrolyte to the matrices as well as providing support for the matrices. Additionally, the passages of some embodiments by-pass certain of the grooves and supply electrolyte directly to other of the grooves. Some embodiments employ single grooves and others have dual grooves. Finally, in some embodiments the passages are connected to the grooves by a step which produces a cascading electrolyte flow.

  8. Pricing strategy in a dual-channel and remanufacturing supply chain system

    NASA Astrophysics Data System (ADS)

    Jiang, Chengzhi; Xu, Feng; Sheng, Zhaohan

    2010-07-01

    This article addresses the pricing strategy problems in a supply chain system where the manufacturer sells original products and remanufactured products via indirect retailer channels and direct Internet channels. Due to the complexity of that system, agent technologies that provide a new way for analysing complex systems are used for modelling. Meanwhile, in order to reduce the computational load of searching procedure for optimal prices and profits, a learning search algorithm is designed and implemented within the multi-agent supply chain model. The simulation results show that the proposed model can find out optimal prices of original products and remanufactured products in both channels, which lead to optimal profits of the manufacturer and the retailer. It is also found that the optimal profits are increased by introducing direct channel and remanufacturing. Furthermore, the effect of customer preference, direct channel cost and remanufactured unit cost on optimal prices and profits are examined.

  9. Experimental performance evaluation of heat pump-based steam supply system

    NASA Astrophysics Data System (ADS)

    Kaida, T.; Sakuraba, I.; Hashimoto, K.; Hasegawa, H.

    2015-08-01

    Heat pumps have become increasingly important as a technology to reduce primary energy consumption and greenhouse effect gas emission. They are presently used mainly on residential air-conditioning and domestic hot water and are expected to spread to industrial heating processes. In 2011, Kobe Steel, Ltd. developed and commercialized two heat pump- based steam supply systems; the high efficiency steam supply system with a steam temperature of 120°C (SGH120) and the system which enables a steam temperature of 165°C (sGh165). For promoting the spread of these industrial heat pumps and enhancing the reliability of them, we investigate experimentally steam generation rate, energy efficiency and controlled performance of the SGH165 under various operating conditions on the assumption of actual different industrial processes, and evaluate technical possibilities for better performance.

  10. 77 FR 31026 - Use of Computer Simulation of the United States Blood Supply in Support of Planning for Emergency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... HUMAN SERVICES Food and Drug Administration Use of Computer Simulation of the United States Blood Supply... (FDA) is announcing a public workshop entitled: ``Use of Computer Simulation of the United States Blood... panel discussions will: (1) Discuss ] simulation modeling of the U.S. blood supply, including...

  11. Design of the klystron filament power supply control system for EAST LHCD

    NASA Astrophysics Data System (ADS)

    Wu, Zege; Wang, Mao; Hu, Huaichuan; Ma, Wendong; Zhou, Taian; Zhou, Faxin; Liu, Fukun; Shan, Jiafang

    2016-09-01

    A filament is a critical component of the klystron used to heat the cathode. There are totally 44 klystrons in experimental advanced superconducting tokamak (EAST) lower hybrid current drive (LHCD) systems. All klystron filaments are powered by AC power suppliers through isolated transformers. In order to achieve better klystron preheat, a klystron filament power supply control system is designed to obtain the automatic control of all filament power suppliers. Klystron filament current is measured by PLC and the interlock between filament current and klystron high voltage system is also implemented. This design has already been deployed in two LHCD systems and proves feasible completely.

  12. Aberrant systemic arterial supply to normal lung arising from the proper hepatic artery discovered during transarterial chemoembolization

    PubMed Central

    Walsworth, Matthew K; Yap, Felix Y; McWilliams, Justin P

    2015-01-01

    We report a rare case of dual arterial supply to an otherwise normal lung discovered incidentally during initial angiography performed with the intent of chemoembolization of hepatocellular carcinoma. In addition to normal hepatic arterial supply, the proper hepatic artery provided systemic arterial supply to the lower lobe of the left lung. Subsequent chest computed tomography angiography demonstrated a normal tracheobronchial tree and normal pulmonary arterial supply to the lung. Although other anatomic variants have been reported, there are no other reported cases of systemic arterial supply from the proper hepatic artery to the lung. Identifying systemic arterial supply to the lung during angiography is important while performing transcatheter chemoembolization or radioembolization in the liver in order to minimize non-target embolization of the lung. PMID:27252792

  13. Managing drought risk with a computer model of the Raritan River Basin water-supply system in central New Jersey

    USGS Publications Warehouse

    Dunne, Paul; Tasker, Gary

    1996-01-01

    The reservoirs and pumping stations that comprise the Raritan River Basin water-supply system and its interconnections to the Delaware-Raritan Canal water-supply system, operated by the New Jersey Water Supply Authority (NJWSA), provide potable water to central New Jersey communities. The water reserve of this combined system can easily be depleted by an extended period of below-normal precipitation. Efficient operation of the combined system is vital to meeting the water-supply needs of central New Jersey. In an effort to improve the efficiency of the system operation, the U.S. Geological Survey (USGS), in cooperation with the NJWSA, has developed a computer model that provides a technical basis for evaluating the effects of alternative patterns of operation of the Raritan River Basin water-supply system. This fact sheet describes the model, its technical basis, and its operation.

  14. A Smartwatch-Driven Medication Management System Compliant to the German Medication Plan.

    PubMed

    Keil, Andreas; Gegier, Konstantin; Pobiruchin, Monika; Wiesner, Martin

    2016-01-01

    Medication adherence is an important factor for the outcome of medical therapies. To support high adherence levels, smartwatches can be used to assist the patient. However, a successful integration of such devices into clinicians' or general practitioners' information systems requires the use of standards. In this paper, a medication management system supplied with smartwatch generated feedback events is presented. It allows physicians to manage their patients' medications and track their adherence in real time. Moreover, it fosters interoperability via a ISO/IEC 16022 data matrix which encodes related medication data in compliance with the German Medication Plan specification. PMID:27577368

  15. Systems Engineering Simulator (SES) Simulator Planning Guide

    NASA Technical Reports Server (NTRS)

    McFarlane, Michael

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  16. River Protection Project (RPP) System Plan

    SciTech Connect

    CERTA, P.J.

    2003-09-23

    . A major programmatic decision point has been established in 2005 that will determine the ultimate deployment strategy for supplemental treatment versus additional capacity added to the WTP. This System Plan investigates the impacts of potential innovations associated with the WTP ILAW facility; and alternative configurations of supplemental treatment.

  17. Computer security plan development using an expert system

    SciTech Connect

    Hunteman, W.J. ); Evans, R.; Brownstein, M.; Chapman, L. )

    1990-01-01

    The Computer Security Plan Assistant (SPA) is an expert system for reviewing Department of Energy (DOE) Automated Data Processing (ADP) Security Plans. DOE computer security policies require ADP security plans to be periodically reviewed and updated by all DOE sites. SPA is written in XI-Plus, an expert system shell. SPA was developed by BDM International, Inc., under sponsorship by the DOE Center for Computer Security at Los Alamos National Laboratory. SPA runs on an IBM or compatible personal computer. It presents a series of questions about the ADP security plan being reviewed. The SPA user references the ADP Security Plan and answers the questions. The SPA user reviews each section of the security plan, in any order, until all sections have been reviewed. The SPA user can stop the review process after any section and restart later. A Security Plan Review Report is available after the review of each section of the Security Plan. The Security Plan Review Report gives the user a written assessment of the completeness of the ADP Security Plan. SPA is being tested at Los Alamos and will soon be available to the DOE community.

  18. Planning for Online Education: A Systems Model

    ERIC Educational Resources Information Center

    Picciano, Anthony G.

    2015-01-01

    The purpose of this article is to revisit the basic principles of technology planning as applied to online education initiatives. While not meant to be an exhaustive treatment of the topic, the article is timely because many colleges and universities are considering the development and expansion of online education as part of their planning…

  19. Focusing Conservation Efforts on Ecosystem Service Supply May Increase Vulnerability of Socio-Ecological Systems.

    PubMed

    Laterra, Pedro; Barral, Paula; Carmona, Alejandra; Nahuelhual, Laura

    2016-01-01

    Growing concern about the loss of ecosystem services (ES) promotes their spatial representation as a key tool for the internalization of the ES framework into land use policies. Paradoxically, mapping approaches meant to inform policy decisions focus on the magnitude and spatial distribution of the biophysical supply of ES, largely ignoring the social mechanisms by which these services influence human wellbeing. If social mechanisms affecting ES demand, enhancing it or reducing it, are taken more into account, then policies are more effective. By developing and applying a new mapping routine to two distinct socio-ecological systems, we show a strong spatial uncoupling between ES supply and socio-ecological vulnerability to the loss of ES, under scenarios of land use and cover change. Public policies based on ES supply might not only fail at detecting priority conservation areas for the wellbeing of human societies, but may also increase their vulnerability by neglecting areas of currently low, but highly valued ES supply. PMID:27167737

  20. Focusing Conservation Efforts on Ecosystem Service Supply May Increase Vulnerability of Socio-Ecological Systems

    PubMed Central

    Barral, Paula; Carmona, Alejandra; Nahuelhual, Laura

    2016-01-01

    Growing concern about the loss of ecosystem services (ES) promotes their spatial representation as a key tool for the internalization of the ES framework into land use policies. Paradoxically, mapping approaches meant to inform policy decisions focus on the magnitude and spatial distribution of the biophysical supply of ES, largely ignoring the social mechanisms by which these services influence human wellbeing. If social mechanisms affecting ES demand, enhancing it or reducing it, are taken more into account, then policies are more effective. By developing and applying a new mapping routine to two distinct socio-ecological systems, we show a strong spatial uncoupling between ES supply and socio-ecological vulnerability to the loss of ES, under scenarios of land use and cover change. Public policies based on ES supply might not only fail at detecting priority conservation areas for the wellbeing of human societies, but may also increase their vulnerability by neglecting areas of currently low, but highly valued ES supply. PMID:27167737

  1. Exploration Supply Chain Simulation

    NASA Technical Reports Server (NTRS)

    2008-01-01

    The Exploration Supply Chain Simulation project was chartered by the NASA Exploration Systems Mission Directorate to develop a software tool, with proper data, to quantitatively analyze supply chains for future program planning. This tool is a discrete-event simulation that uses the basic supply chain concepts of planning, sourcing, making, delivering, and returning. This supply chain perspective is combined with other discrete or continuous simulation factors. Discrete resource events (such as launch or delivery reviews) are represented as organizational functional units. Continuous resources (such as civil service or contractor program functions) are defined as enabling functional units. Concepts of fixed and variable costs are included in the model to allow the discrete events to interact with cost calculations. The definition file is intrinsic to the model, but a blank start can be initiated at any time. The current definition file is an Orion Ares I crew launch vehicle. Parameters stretch from Kennedy Space Center across and into other program entities (Michaud Assembly Facility, Aliant Techsystems, Stennis Space Center, Johnson Space Center, etc.) though these will only gain detail as the file continues to evolve. The Orion Ares I file definition in the tool continues to evolve, and analysis from this tool is expected in 2008. This is the first application of such business-driven modeling to a NASA/government-- aerospace contractor endeavor.

  2. Distributed diagnostic system for tokamaks high-voltage power supply section

    NASA Astrophysics Data System (ADS)

    Wojenski, A.; Kasprowicz, G.; Pozniak, K. T.; Juszczyk, B.; Zienkiewicz, P.

    2015-09-01

    This paper describes recently developed system for diagnostics of high-voltage power supply section of tokamaks'. Such system is necessary for real-time monitoring of high-voltage power supply section with ability to perform automatic and fast decisions related to protection system. The system is distributed, allowing data acquisition of components installed away from the systems' controller. Remote communication is based on fiber links. Main processing units are FPGA circuits. The system can pass-through analog and digital signals from local to remote or remote to local locations. In the main FPGA unit, independent user developed algorithms can be implemented. The system structure is based on the uTCA standard. The micro TCA crate controller is implemented as PC unit in AMC standard. Communication is based on gigabit transceivers providing low-latency of data transmission. The system is working with specialized diagnostics and control software. The graphical user interface is provided for the end user. Several tests were made in term of data latency, proper signal transmission and system control.

  3. Forecasting drought risks for a water supply storage system using bootstrap position analysis

    USGS Publications Warehouse

    Tasker, Gary; Dunne, Paul

    1997-01-01

    Forecasting the likelihood of drought conditions is an integral part of managing a water supply storage and delivery system. Position analysis uses a large number of possible flow sequences as inputs to a simulation of a water supply storage and delivery system. For a given set of operating rules and water use requirements, water managers can use such a model to forecast the likelihood of specified outcomes such as reservoir levels falling below a specified level or streamflows falling below statutory passing flows a few months ahead conditioned on the current reservoir levels and streamflows. The large number of possible flow sequences are generated using a stochastic streamflow model with a random resampling of innovations. The advantages of this resampling scheme, called bootstrap position analysis, are that it does not rely on the unverifiable assumption of normality and it allows incorporation of long-range weather forecasts into the analysis.

  4. Shuttle cryogenic supply system optimization study. Volume 5A-1: Users manual for math models

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The Integrated Math Model for Cryogenic Systems is a flexible, broadly applicable systems parametric analysis tool. The program will effectively accommodate systems of considerable complexity involving large numbers of performance dependent variables such as are found in the individual and integrated cryogen systems. Basically, the program logic structure pursues an orderly progression path through any given system in much the same fashion as is employed for manual systems analysis. The system configuration schematic is converted to an alpha-numeric formatted configuration data table input starting with the cryogen consumer and identifying all components, such as lines, fittings, and valves, each in its proper order and ending with the cryogen supply source assembly. Then, for each of the constituent component assemblies, such as gas generators, turbo machinery, heat exchangers, and accumulators, the performance requirements are assembled in input data tabulations. Systems operating constraints and duty cycle definitions are further added as input data coded to the configuration operating sequence.

  5. SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

    SciTech Connect

    CRAWFORD TW; CERTA PJ; WELLS MN

    2010-01-14

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  6. NASA's Radioisotope Power Systems Planning and Potential Future Systems Overview

    NASA Technical Reports Server (NTRS)

    Zakrajsek, June F.; Woerner, Dave F.; Cairns-Gallimore, Dirk; Johnson, Stephen G.; Qualls, Louis

    2016-01-01

    The goal of NASA's Radioisotope Power Systems (RPS) Program is to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet the needs of the missions. To meet this goal, the RPS Program, working closely with the Department of Energy, performs mission and system studies (such as the recently released Nuclear Power Assessment Study), assesses the readiness of promising technologies to infuse in future generators, assesses the sustainment of key RPS capabilities and knowledge, forecasts and tracks the Program's budgetary needs, and disseminates current information about RPS to the community of potential users. This process has been refined and used to determine the current content of the RPS Program's portfolio. This portfolio currently includes an effort to mature advanced thermoelectric technology for possible integration into an enhanced Multi-Mission Radioisotope Generator (eMMRTG), sustainment and production of the currently deployed MMRTG, and technology investments that could lead to a future Stirling Radioisotope Generator (SRG). This paper describes the program planning processes that have been used, the currently available MMRTG, and one of the potential future systems, the eMMRTG.

  7. Development of an expert planning system for OSSA

    NASA Technical Reports Server (NTRS)

    Groundwater, B.; Lembeck, M. F.; Sarsfield, L.; Diaz, Alphonso

    1988-01-01

    This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

  8. The temporal relationship between drug supply indicators: an audit of international government surveillance systems

    PubMed Central

    Werb, Dan; Kerr, Thomas; Nosyk, Bohdan; Strathdee, Steffanie; Montaner, Julio; Wood, Evan

    2013-01-01

    Objectives Illegal drug use continues to be a major threat to community health and safety. We used international drug surveillance databases to assess the relationship between multiple long-term estimates of illegal drug price and purity. Design We systematically searched for longitudinal measures of illegal drug supply indicators to assess the long-term impact of enforcement-based supply reduction interventions. Setting Data from identified illegal drug surveillance systems were analysed using an a priori defined protocol in which we sought to present annual estimates beginning in 1990. Data were then subjected to trend analyses. Main outcome measures Data were obtained from government surveillance systems assessing price, purity and/or seizure quantities of illegal drugs; systems with at least 10 years of longitudinal data assessing price, purity/potency or seizures were included. Results We identified seven regional/international metasurveillance systems with longitudinal measures of price or purity/potency that met eligibility criteria. In the USA, the average inflation-adjusted and purity-adjusted prices of heroin, cocaine and cannabis decreased by 81%, 80% and 86%, respectively, between 1990 and 2007, whereas average purity increased by 60%, 11% and 161%, respectively. Similar trends were observed in Europe, where during the same period the average inflation-adjusted price of opiates and cocaine decreased by 74% and 51%, respectively. In Australia, the average inflation-adjusted price of cocaine decreased 14%, while the inflation-adjusted price of heroin and cannabis both decreased 49% between 2000 and 2010. During this time, seizures of these drugs in major production regions and major domestic markets generally increased. Conclusions With few exceptions and despite increasing investments in enforcement-based supply reduction efforts aimed at disrupting global drug supply, illegal drug prices have generally decreased while drug purity has generally

  9. On the definition of risk of scarcity for water supply systems

    NASA Astrophysics Data System (ADS)

    Romano, Emanuele; Del Bon, Andrea; Bruna Petrangeli, Anna; Preziosi, Elisabetta

    2013-04-01

    Conditions of scarcity for a water supply system occur when the available resource are not able to satisfy the related demands. The definition of risk of scarcity usually relies on three quantities: the reliability, that is a measure of the probability of the system to perform in a satisfactory way during a given operation period, the resiliency, aiming to capture the ability of the system to recover after a period of deficit, and the vulnerability, whose goal is to measure the severity of possible deficits. Then, the three different quantities can be merged in a single risk index by a simple weighted average. Although the basis for such a definition are clear, the operative way to define the risk index can much affect the final value and, as a consequence, the assessment of the effective risk of scarcity for a water supply system. This work aims at getting more insight on the following issues: 1) the most commonly accepted definitions of reliability, resiliency and vulnerability are based on the probability of occurrence of failure and the related persistence and intensity; however, defining such a probability is quite hard due to the fact that for most of the water supply systems the available time series of recharge, demand and number of failures are not sufficient to process them statistically. 2) Resiliency is usually defined as the mean duration of failures, whatever its probability of occurrence. However, in many cases water managers are more troubled by few persistent episodes (although less probable), than by several short episodes of water scarcity. 3) Analogously, vulnerability is usually defined as the mean deficit during failure periods, neglecting the maximum possible deficit which is sometimes more useful for management purposes. Along these lines, a new method to evaluate the risk of failure for water supply systems is proposed. The new definition of risk takes into account also the extreme events, both positive and negative. Reliability, resiliency

  10. A mission planning concept and mission planning system for future manned space missions

    NASA Technical Reports Server (NTRS)

    Wickler, Martin

    1994-01-01

    The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.

  11. Electric utility system planning studies for OTEC power integration

    NASA Astrophysics Data System (ADS)

    1980-11-01

    The integration of OTEC into the Florida Power Corporation (FTC) system was evaluated. Existing system planning procedures, assumptions, and corporate financial criteria for planning generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis: the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by FPC.

  12. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas.

    PubMed

    Chang, Hsien-Tsung; Chang, Yi-Ming; Tsai, Meng-Tze

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning.

  13. Long-term climate sensitivity of an integrated water supply system: The role of irrigation.

    PubMed

    Guyennon, Nicolas; Romano, Emanuele; Portoghese, Ivan

    2016-09-15

    The assessment of the impact of long-term climate variability on water supply systems depends not only on possible variations of the resources availability, but also on the variation of the demand. In this framework, a robust estimation of direct (climate induced) and indirect (anthropogenically induced) effects of climate change is mandatory to design mitigation measures, especially in those regions of the planet where the groundwater equilibrium is strongly perturbed by exploitations for irrigation purposes. The main goal of this contribution is to propose a comprehensive model that integrates distributed crop water requirements with surface and groundwater mass balance, able to consider management rules of the water supply system. The proposed overall model, implemented, calibrated and validated for the case study of the Fortore water supply system (Apulia region, South Italy), permits to simulate the conjunctive use of the water from a surface artificial reservoir and from groundwater. The relative contributions of groundwater recharges and withdrawals to the aquifer stress have been evaluated under different climate perturbations, with emphasis on irrigation practices. Results point out that irrigated agriculture primarily affects groundwater discharge, indicating that ecosystem services connected to river base flow are particularly exposed to climate variation in irrigated areas. Moreover, findings show that the recharge both to surface and to groundwater is mainly affected by drier climate conditions, while hotter conditions have a major impact on the water demand. The non-linearity arising from combined drier and hotter conditions may exacerbate the aquifer stress by exposing it to massive sea-water intrusion.

  14. Computer model of Raritan River Basin water-supply system in central New Jersey

    USGS Publications Warehouse

    Dunne, Paul; Tasker, Gary D.

    1996-01-01

    This report describes a computer model of the Raritan River Basin water-supply system in central New Jersey. The computer model provides a technical basis for evaluating the effects of alternative patterns of operation of the Raritan River Basin water-supply system during extended periods of below-average precipitation. The computer model is a continuity-accounting model consisting of a series of interconnected nodes. At each node, the inflow volume, outflow volume, and change in storage are determined and recorded for each month. The model runs with a given set of operating rules and water-use requirements including releases, pumpages, and diversions. The model can be used to assess the hypothetical performance of the Raritan River Basin water- supply system in past years under alternative sets of operating rules. It also can be used to forecast the likelihood of specified outcomes, such as the depletion of reservoir contents below a specified threshold or of streamflows below statutory minimum passing flows, for a period of up to 12 months. The model was constructed on the basis of current reservoir capacities and the natural, unregulated monthly runoff values recorded at U.S. Geological Survey streamflow- gaging stations in the basin.

  15. Guideline for the Comprehensive Campus Master Plan System.

    ERIC Educational Resources Information Center

    State Univ. System of Florida, Tallahassee.

    This document is a guideline for institutions in the Florida State University System to use as they comply with state mandates requiring them to develop campus master plans and land management plans. It supplements the minimum criteria in the state's Administrative Code. For each element the guide offers description of its purpose, data…

  16. The Oregon Planning Programming Budgeting Systems Institute. Final Report.

    ERIC Educational Resources Information Center

    McAbee, Harold V.

    The Oregon Planning-Programming-Budgeting-Systems Institute, which was held August 19 through 30, 1968, was one of three such institutes financed by the U.S. Office of Education, Bureau of Vocational Education. It was designed to acquaint State level vocational education administrators with the potential and workings of planning, programming,…

  17. Benefits of advanced software techniques for mission planning systems

    NASA Technical Reports Server (NTRS)

    Gasquet, A.; Parrod, Y.; Desaintvincent, A.

    1994-01-01

    The increasing complexity of modern spacecraft, and the stringent requirement for maximizing their mission return, call for a new generation of Mission Planning Systems (MPS). In this paper, we discuss the requirements for the Space Mission Planning and the benefits which can be expected from Artificial Intelligence techniques through examples of applications developed by Matra Marconi Space.

  18. Research Perspectives for Material Requirements Planning Systems. Paper No. 434.

    ERIC Educational Resources Information Center

    Berry, W. L.; Whybark, D. Clay

    Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…

  19. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  20. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  1. Space Station thermal management system development status and plans

    NASA Technical Reports Server (NTRS)

    Rankin, J. G.

    1985-01-01

    The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.

  2. Evaluating the Current and Future Water Supply and Demands in the Apurimac River Basin, in Peru. Sensitivity Analysis of a Hydrologic and Water Planning Model

    NASA Astrophysics Data System (ADS)

    Yi, S.; Sandoval Solis, S.; Bombardelli, F. A.

    2014-12-01

    This research presents an analysis to estimate water availability and water supply for current and future water management policies in the Apurimac River Basin (ARB), in Peru. The objective of this research is to build a coupled hydrologic and water planning model to simulate the water availability and water supply in the ARB. This model is used to evaluate the average (synthetic) and historic conditions to test current and future water demands that include the construction of a reservoir. The hydrologic model is a two bucket model, where the processes of direct runoff, interflow and baseflow are represented in the top bucket and the process of groundwater storage is represented in the bottom bucket. The water planning model is a routing model that calculates the water balance between water supply, water demand and change in storage throughout the basin. The Water Evaluation and Planning (WEAP) platform is used in this research. Model inputs are climate data (precipitation, air temperature, relative humidity and wind velocity) and land use data (land use cover and crop coefficients). Streamflow at different control points and water budgets for all the sub-basin have been calculated to calibrate the model. A sensitivity analysis for the input data was performed to identify parameters that affect the most the water budget for each sub-basin. Precipitation is the most sensitive input data and root zone conductivity is the most sensitive parameter in the model. This research explains the implications of these conditions, and their impact in the analysis of the water availability and water supply for current and future water demands in the ARB.

  3. Engineering calculations for communications satellite systems planning

    NASA Technical Reports Server (NTRS)

    Reilly, Charles H.; Walton, Eric K.; Kohnhorst, Paul

    1987-01-01

    A procedure is described that was used to calculate minimum required satellite separations based on total link carrier to interference requirements. Also summarized are recent results with a switching algorithm for satellite synthesis problems. Analytic solution value bounds for two of the satellite synthesis models studied are described. Preliminary results from an empirical study of alternate mixed integer programming models for satellite synthesis are presented. Research plans for the near future are discussed.

  4. A tool for technical assessment of rural water supply systems in South Africa

    NASA Astrophysics Data System (ADS)

    Rietveld, L. C.; Haarhoff, J.; Jagals, P.

    Water and sanitation services provide a cost-effective solution for alleviating the impact of water-borne diseases. Actually, for water supply projects a top-down approach is followed, giving priority to deliver sufficient quantities of water, increasing its availability by investment in new systems. Little attention is paid to the functioning of these systems on the long-term, and its maintenance and operational constraints. In this paper, a methodology was developed to technically assess water supply systems based on four criteria, namely availability, capacity, continuity and condition. The practicality of the approach is demonstrated by a technical assessment of a number of water supply systems in the Vhembe District in South Africa. The systems consist of piped distribution systems with public standpipes, mostly fed by groundwater. In general, it can be concluded that the performance of the systems, although relatively new, is poor. The availability (criterion 1) of the drinking water is a problem due to poorly constructed boreholes or disagreement on the payment of the operational cost after construction. In most villages the capacity (criterion 2) of the installed infrastructure is sufficient, although storage volume is in some villages too small. The continuity (criterion 3) of the water supply is threatened by disputes about payment of diesel for the pump and maintenance and repair of the pump. Finally, the condition (criterion 4) is poor mostly due to taps at the standpipes which are damaged and require frequent replacement. Despite the simplicity of the proposed assessment methodology, it provides rapid insight in the state of a system and is ideal for bench marking the performance of different systems in different regions. Furthermore, the quantitative measures of the four different criteria allow system operators and planners to rapidly pinpoint the reasons for poor performance and to take the appropriate corrective action. The used weighting factors

  5. System Summary of University Annual Work Plans, 2014-15

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future; (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…

  6. Development and Testing of an Ultracapacitor Based Uninterruptible Power Supply (UPS) System

    NASA Technical Reports Server (NTRS)

    Eichenberg, Dennis J.

    2010-01-01

    The NASA Glenn Research Center (GRC) initiated the development and testing of an ultracapacitor based uninterruptible power supply (UPS) system as a means to provide backup power for the many critical NASA applications. A UPS system typically utilizes batteries for energy storage. The battery is the most vulnerable part of the UPS system, requiring regular maintenance and replacement. Battery performance is also extremely temperature dependent. Ultracapacitors are ideal for UPS systems where long life, maintenance free operation, and excellent low temperature performance is essential. State of the art symmetric ultracapacitors were used for these tests. The ultracapacitors were interconnected in an innovative configuration to minimize interconnection impedance, and to provide voltage balancing. Ultracapacitors can be charged extremely rapidly and supply high current, which are essential characteristics for an effective UPS system. Charging ultracapacitors is significantly less complex than charging batteries since there is no chemical reaction occurring while charging ultracapacitors. The report concludes that the implementation of symmetric ultracapacitors in a UPS system can provide significant improvements in power system performance and reliability.

  7. [Environmental impact assessment based on planning support system].

    PubMed

    Chen, Wen-Bo; Carsjens, Gerrit-Jan

    2011-02-01

    How to assess environmental impact is one of the keys in land use planning. This article described in detail the concepts of activities, impact zones, functions, and sensitivities, as well as the development of STEPP (strategic tool for integrating environmental aspects in planning procedures) based on Avenue, the secondary developing language of ArcView GIS. The system makes it convenient for planning practitioners exchanging information, and can spatially, visually and quantitatively describe environmental impact and its change. In this study, the urban-rural combination area located between EDE and Veenendaal of The Netherlands was taken as case, and the results indicated that the environment was incorporated well in the planning procedure based on the concepts, and could also demonstrate the effects of planning measures on environment spatially, explicitly, and in real-time, facilitating the participation of planning practitioners and decision-making. Some proposals of how to promote STEEP application in China were suggested.

  8. Apparatus and methods for supplying auxiliary steam in a combined cycle system

    DOEpatents

    Gorman, William G.; Carberg, William George; Jones, Charles Michael

    2002-01-01

    To provide auxiliary steam, a low pressure valve is opened in a combined cycle system to divert low pressure steam from the heat recovery steam generator to a header for supplying steam to a second combined cycle's steam turbine seals, sparging devices and cooling steam for the steam turbine if the steam turbine and gas turbine lie on a common shaft with the generator. Cooling steam is supplied the gas turbine in the combined cycle system from the high pressure steam turbine. Spent gas turbine cooling steam may augment the low pressure steam supplied to the header by opening a high pressure valve whereby high and low pressure steam flows are combined. An attemperator is used to reduce the temperature of the combined steam in response to auxiliary steam flows above a predetermined flow and a steam header temperature above a predetermined temperature. The auxiliary steam may be used to start additional combined cycle units or to provide a host unit with steam turbine cooling and sealing steam during full-speed no-load operation after a load rejection.

  9. Does farm worker health vary between localised and globalised food supply systems?

    PubMed

    Cross, Paul; Edwards, Rhiannon T; Opondo, Maggie; Nyeko, Philip; Edwards-Jones, Gareth

    2009-10-01

    Significant environmental benefits are claimed for local food systems, but these biophysical indicators are increasingly recognised as inadequate descriptors of supply chain ethics. Social factors such as health are also important indicators of good practice, and are recognised by the organic and local food movements as important to the development of rounded sustainable agricultural practices. This study compared the self-reported health status of farm workers in the United Kingdom, Spain, Kenya and Uganda who were supplying distant markets with fresh vegetables. Workers on Kenyan export horticulture farms reported significantly higher levels of physical health than did Kenyan non-export farm workers and workers in the other study countries. Mean health levels for farm workers in the United Kingdom were significantly lower than relevant population norms, indicating widespread levels of poor health amongst these workers. These results suggest that globalised supply chains can provide social benefits to workers, while local food systems do not always provide desirable social outcomes. The causal mechanisms of these observations probably relate more to the social conditions of workers than directly to income. PMID:19482357

  10. Effects of changes in seasonal precipitation in Catskill Mountain region on NYC water supply system management

    NASA Astrophysics Data System (ADS)

    Matonse, A. H.; Pierson, D. C.; Frei, A.; Zion, M.; Mukundan, R.

    2010-12-01

    Simulated future air temperature and precipitation derived from General Circulation Models (GCMs) are used as input to the Generalized Watershed Loading Functions - Variable Source Area (GWLF-VSA) watershed model to simulate future inflows to reservoirs that are part of the New York City Water Supply System (NYCWSS). This ongoing study focuses on the effect of projected changes in temperature and rainfall in the Catskill Mountain region and consequent changes in snow accumulation, snowmelt and the timing of runoff on NYC water supply system storage and operation as simulated by the NYC reservoir system OASIS model. Future scenarios that use current system operation rules and demands, but changed reservoir inflows, suggest that changes in precipitation and snowmelt in this region will affect water availability on a seasonal basis. Despite increased evapotranspiration during non-winter periods, greater runoff earlier in the winter period leads to a reduction in the number of days the system is under drought conditions, and earlier reservoir refill in the spring. Since reservoir storage levels fill up earlier in winter, total volume of water releases and spills also appear to increase during the winter. Of importance is how much (if any) indication of this possible future trend is already captured in current observations and at what level these changes will require operation rules to be adjusted in order to continue to achieve the management objectives of the system.

  11. Water-supply systems for rural areas and small communities in Colombia*

    PubMed Central

    Pachón-Rojas, Luis

    1954-01-01

    As part of a rural-sanitation campaign in Colombia, the National Federation of Coffee Growers of Colombia (NFCG) in 1942 initiated a scheme for ensuring an adequate provision of water to coffee-growers in rural, mountainous areas, both for domestic use and for coffee-processing. Where farms are reasonably closely grouped collective water-supply systems are used, but it is also frequently necessary to construct individual systems. In either case, the cost of installation is shared by the NFCG and those who directly benefit. The average cost of the collective system has been Colombian pesos 12,000 per system, while the cost of individual installations has varied between Colombian pesos 650 and 935. Each collective system is administered and operated by a rural water board composed of local farmers, while technical problems are referred to the engineering staff of the NFCG. In general, the cheaper gravity system is preferred, but in individual installations it has often proved necessary to provide hand pumps or hydraulic rams. Through improvement in the water supply, the prevalence of water-borne diseases has considerably decreased, while the rate of coffee-production has increased. PMID:13160759

  12. Program Planning and Grant Writing in One Massachusetts School System.

    ERIC Educational Resources Information Center

    Maloy, Robert W.; Seldin, Clement A.

    1982-01-01

    The Greenfield Secondary Schools Project in Greenfield (Massachusetts) includes a planning and grant-writing system, a grantsperson, and a structure encouraging community involvement and interagency cooperation, and has enabled Greenfield to finance innovation in lean times. (Author/JM)

  13. 300 Area waste acid treatment system closure plan. Revision 1

    SciTech Connect

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  14. Intelligent transportation systems strategic plan: Phase 1 report

    SciTech Connect

    1998-05-01

    This interim report on an Intelligent Transportation Systems (ITS) Strategic Plan has been developed as documentation of the process of offering a vision for ITS and recommending an outline for organizational structure, infrastructure, and long-term planning for ITS in Kentucky. This plan provides an overview of the broad scope of ITS and relationships between various Intelligent Vehicle Highway Systems (IVHS) functional areas and ITS user service areas. Three of the functional areas of ITS have been addressed in this interim report with sections devoted to mission, vision, goals, and potential technology applications. Within each of the three areas, recommendations have been made for applications and technologies for deployment. A more formalized business plan for ITS will be developed to recommend specific projects for implementation. Those three functional areas are: (1) Advanced Rural Transportation Systems (ARTS), (2) Advanced Traveler Information Systems (ATIS), and (3) Commercial Vehicle Operations (CVO).

  15. Tank Waste Remediation System Projects Document Control Plan

    SciTech Connect

    Slater, G.D.; Halverson, T.G.

    1994-09-30

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project.

  16. Net-Zero Energy Buildings: A Classification System Based on Renewable Energy Supply Options

    SciTech Connect

    Pless, S.; Torcellini, P.

    2010-06-01

    A net-zero energy building (NZEB) is a residential or commercial building with greatly reduced energy needs. In such a building, efficiency gains have been made such that the balance of energy needs can be supplied with renewable energy technologies. Past work has developed a common NZEB definition system, consisting of four well-documented definitions, to improve the understanding of what net-zero energy means. For this paper, we created a classification system for NZEBs based on the renewable sources a building uses.

  17. Physician density planning in a public healthcare system: Complexities, threats and opportunities-The case of the Israeli healthcare system.

    PubMed

    Gamzu, Ronni; Kaidar, Nir; Afek, Arnon; Horev, Tuvia

    2016-08-01

    Human-resource planning in healthcare is one of the most significant challenges that healthcare systems worldwide face. Among all healthcare professions, the planning of physician supply is the most complex of all due to physicians' lengthy training and many specialties. Forecasts showing a disturbing downward trend in the ratio of physicians to population in Israel prompted the Israeli Government in 2010 to establish a committee mandated to predict demand for physicians and recommend steps to adjust supply to it. The committee analyzed numerous variables that affect physician supply and demand and recommended measures that in greater part were implemented. The article discusses the methodology of the committee, its recommendations, and their implementation such as a 52% increase in the number of first-year medical students between 2010 and 2012. Its analysis of the current situation shows that the implementation of the recommendations successfully stemmed the decrease in physician density and attained the committee's other long-term objectives: physician density of 2.9 per 1000 of population and an increase (32.5%) in the number of physicians who began training in targeted specialties. PMID:27496154

  18. Engineering calculations for communications satellite systems planning

    NASA Technical Reports Server (NTRS)

    Reilly, C. H.; Levis, C. A.; Buyukdura, O. M.; Mount-Campbell, C. A.

    1986-01-01

    Observed solution times were analyzed for the extended gradient and cyclic coordinate search procedures. The times used in the analysis come from computer runs made during a previously-reported experiment conducted to assess the quality of the solutions to a BSS synthesis problem found by the two search methods. The results of a second experiment with a Fixed Satellite Service (FSS) test problem are also presented. Computational results are summarized for mixed integer programming approaches for solving FSS synthesis problems. A promising heuristic algorithm is described. A synthesis model is discussed for orbital arc allotment optimization. Research plans for the near future are also presented.

  19. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  20. Region Three Aerial Measurement System Flight Planning Tool - 12006

    SciTech Connect

    Messick, Chuck; Pham, Minh; Smith, Ron; Isiminger, Dave

    2012-07-01

    The Region 3 Aerial Measurement System Flight Planning Tool is used by the National Nuclear Security Agency (NNSA), United States Department of Energy, Radiological Assistance Program, Region 3, to respond to emergency radiological situations. The tool automates the flight planning package process while decreasing Aerial Measuring System response times and decreases the potential for human error. Deployment of the Region Three Aerial Measurement System Flight Planning Tool has resulted in an immediate improvement to the flight planning process in that time required for mission planning has been reduced from 1.5 hours to 15 minutes. Anecdotally, the RAP team reports that the rate of usable data acquired during surveys has improved from 40-60 percent to over 90 percent since they began using the tool. Though the primary product of the flight planning tool is a pdf format document for use by the aircraft flight crew, the RAP team has begun carrying their laptop computer on the aircraft during missions. By connecting a Global Positioning System (GPS) device to the laptop and using ESRI ArcMap's GPS tool bar to overlay the aircraft position directly on the flight plan in real time, the RAP team can evaluate and correct the aircraft position as the mission is executed. (authors)

  1. Manned spaceflight activity planning with knowledge-based systems

    NASA Technical Reports Server (NTRS)

    Mogilensky, J.; Dalton, R. E.; Scarl, E. A.

    1983-01-01

    An on-board expert system, capable of assisting with crew-activity planning and platform-status monitoring, could provide unprecedented autonomy to the crew of a permanently manned space station. To demonstrate this concept's feasibility, an existing knowledge-based system is adapted to support Space Shuttle crew-activity timeline planning. Proposed timeline changes are to be checked for compliance with crew capabilities and mission operating guidelines, so that a nonexpert can be guided through a successful plan modification. Early lessons that have been learned about the scope of the adaptation needed to achieve this objective are presented.

  2. Diagnosing strategic performance of the hospital information systems planning cycle.

    PubMed

    Ferrand, D J; Lay, C M

    1994-01-01

    Hospital information systems planning (HISP) involves large expenditures. Often the evaluation of its performance is unstructured, giving no direction for future strategic choices for information systems (IS) development. This article formulates the challenge facing senior management when it must define priorities for the next IS planning cycle. New IS applications are selected to enhance the IS portfolio profile and the users' functionality, taking account of the past and anticipated response to resources invested. A methodology, new tools, and analyses for conducting the diagnosis of the last planning cycle are described.

  3. Design and Application of The Painting Material Supply System of The Painting Robot for Steel Products

    NASA Astrophysics Data System (ADS)

    Miyawaki, Kunio; Hisayasu, Azuma; Mori, Tsunehito; Miyazaki, Tatsuo; Nakashima, Yoshio

    With the increase of painting works and the decrease of skilled workers, the demand for robot painting of the large-scale steel product is rapidly increasing. But there are many technical problems in the development of the painting robot for this use. The collision between a robot and a work-piece is one of the most important problems, because the robot operates in a small space of a work-piece. Above all, the collision of the painting material supply hose with painted film on a work-piece is very serious. To avoid the hose collision, we propose an in-line type of paint supply mechanism using swivel joints. The key point in this system is the sealing performance and its durability, and we propose the piping system with compliance to strengthen the sealing performance. In this paper, the design method of this system is discussed on the basis of the analysis of the fluctuatinal elastic deformation of a O-ring in the swivel joint. We produced a prototype of the painting robot with the in-line system designed by this method. Application of this robot to the painting of ship-hull block is also discussed. Results from this application show the effectiveness of the in-line system.

  4. The Star Rating System and Medicare Advantage Plans.

    PubMed

    Sprague, Lisa

    2015-05-01

    With nearly 30 percent of Medicare beneficiaries opting to enroll in Medicare Advantage (MA) plans instead of fee-for-service Medicare, it's safe to say the MA program is quite popular. The Centers for Medicare & Medicaid Services (CMS) administers a Star Ratings program for MA plans, which offers measures of quality and service among the plans that are used not only to help beneficiaries choose plans but also to award additional payments to plans that meet high standards. These additional payments, in turn, are used by plans to provide additional benefits to beneficiaries or to reduce cost sharing--added features that are likely to factor into beneficiaries' choice of MA plans. The Star Ratings program is also meant to drive improvements in the quality of plans, and this secondary effort seems to have been successful. Despite this success, issues with the Star Ratings system remain, including: how performance metrics are developed, chosen, and maintained; how differences among beneficiary populations (particularly with regard to the dually eligible and those receiving low-income subsidies) should be recognized; and the extent to which health plans can control the variables on which they are being measured. Because the Star Ratings approach has been extended to providers of health care as well--hospitals, nursing homes, and dialysis facilities--these issues are worth exploring as CMS fine-tunes its methods of measurement. PMID:26072530

  5. The Star Rating System and Medicare Advantage Plans.

    PubMed

    Sprague, Lisa

    2015-05-01

    With nearly 30 percent of Medicare beneficiaries opting to enroll in Medicare Advantage (MA) plans instead of fee-for-service Medicare, it's safe to say the MA program is quite popular. The Centers for Medicare & Medicaid Services (CMS) administers a Star Ratings program for MA plans, which offers measures of quality and service among the plans that are used not only to help beneficiaries choose plans but also to award additional payments to plans that meet high standards. These additional payments, in turn, are used by plans to provide additional benefits to beneficiaries or to reduce cost sharing--added features that are likely to factor into beneficiaries' choice of MA plans. The Star Ratings program is also meant to drive improvements in the quality of plans, and this secondary effort seems to have been successful. Despite this success, issues with the Star Ratings system remain, including: how performance metrics are developed, chosen, and maintained; how differences among beneficiary populations (particularly with regard to the dually eligible and those receiving low-income subsidies) should be recognized; and the extent to which health plans can control the variables on which they are being measured. Because the Star Ratings approach has been extended to providers of health care as well--hospitals, nursing homes, and dialysis facilities--these issues are worth exploring as CMS fine-tunes its methods of measurement.

  6. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  7. Plans for a National Physics Information System.

    ERIC Educational Resources Information Center

    Alt, Franz L.; Herschman, Arthur

    Against a background of widespread interest in national information systems, the American Institute of Physics is developing such a system for physics. This program pivots on the design of a new classification system for physics which is to be used, in conjunction with free-language index terms, for the intellectual organization of the physics…

  8. 48 CFR 11.403 - Supplies or services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Supplies or services. 11.403 Section 11.403 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 11.403 Supplies or services. (a)...

  9. Supply Chain Collaboration Alternatives: Understanding the Expected Costs and Benefits.

    ERIC Educational Resources Information Center

    McLaren, Tim; Head, Milena; Yuan, Yufei

    2002-01-01

    Discusses collaboration as a recent trend in supply chain management (SCM) that focuses on joint planning, coordination, and process integration between suppliers, customers, and other partners in a supply chain. Analyzes alternative information systems approaches for supporting collaborative SCM, including phone, fax, or email systems; Web-based…

  10. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  11. Metis Hub: The Development of an Intuitive Project Planning System

    SciTech Connect

    McConnell, Rachael M.

    2015-08-26

    The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

  12. Automatic Production Planning System to Achieve Flexible Direct Machining

    NASA Astrophysics Data System (ADS)

    Nakamoto, Keiichi; Shirase, Keiichi; Wakamatsu, Hidefumi; Tsumaya, Akira; Arai, Eiji

    For shortening of production lead-time, it is needed to eliminate time and efforts for process and operation planning after product design. However, a conventional NC machine tool has no autonomy and intelligence to achieve direct machining operation or “Rapid Manufacturing”. Because CL data and cutting parameters for machining operation have to be determined precisely in process and operation planning. In this study, in order to realize an autonomous and intelligent machine tool, the digital copy milling system which allows to generate tool paths during machining operation, and the trouble free machining strategy which allows to adapt cutting parameters, have been developed. And, an automatic process and operation planning system has been developed to integrate with the functions mentioned. This planning system works on commercial CAD software, and a prototype of autonomous and intelligent machine tool can achieve direct machining operation or “Rapid Manufacturing” which does not require any effort to prepare an NC program.

  13. Archimedes: A system that plans and executes mechanical assemblies

    SciTech Connect

    Strip, D.

    1990-01-01

    Archimedes is a prototype mechanical assembly system which generates and executes robot assembly programs from a CAD model input. The system addresses the unrealized potential for flexibility in robotic mechanical assembly applications by automating the programming task. Input is a solid model of the finished assembly. Parts relationships and geometric constraints are deduced from the solid model. A rule-based planner generates a generic'' assembly plan that satisfies the geometric constraints, as well as other constraints embodied in the rules. A retargetable plan compiler converts the generic plan into code specific to an application environment. Execution of the compiled plan in a workcell containing an Adept Two robot, a vision system, and other parts handling equipment will be shown on videotape.

  14. Stockpiling Supplies for the Next Influenza Pandemic

    PubMed Central

    Magalian, Paul D.; Hollingsworth, Mary Kay; Baracco, Gio

    2009-01-01

    Faced with increasing concerns about the likelihood of an influenza pandemic, healthcare systems have been challenged to determine what specific medical supplies that should be procured and stockpiled as a component of preparedness. Despite publication of numerous pandemic planning recommendations, little or no specific guidance about the types of items and quantities of supplies needed has been available. The primary purpose of this report is to detail the approach of 1 healthcare system in building a cache of supplies to be used for patient care during the next influenza pandemic. These concepts may help guide the actions of other healthcare systems. PMID:21970033

  15. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  16. Multi-dimensional Conjunctive Operation Rule for the Water Supply System

    NASA Astrophysics Data System (ADS)

    Chiu, Y.; Tan, C. A.; CHEN, Y.; Tung, C.

    2011-12-01

    In recent years, with the increment of floods and droughts, not only in numbers but also in intensities, floods were severer during the wet season and the droughts were more serious during the dry season. In order to reduce their impact on agriculture, industry, and even human being, the conjunctive use of surface water and groundwater has been paid much attention and become a new direction for the future research. Traditionally, the reservoir operation usually follows the operation rule curve to satisfy the water demand and considers only water levels at the reservoirs and time series. The strategy used in the conjunctive-use management model is that the water demand is first satisfied with the reservoirs operated based on the rule curves, and the deficit between demand and supply, if exists, is provided by the groundwater. In this study, we propose a new operation rule, named multi-dimensional conjunctive operation rule curve (MCORC), which is extended from the concept of reservoir operation rule curve. The MCORC is a three-dimensional curve and is applied to both surface water and groundwater. Three sets of parameters, water levels and the supply percentage at reservoirs, groundwater levels and the supply percentage, and time series, are considered simultaneously in the curve. The zonation method and heuristic algorithm are applied to optimize the curve subject to the constraints of the reservoir operation rules and the safety yield of groundwater. The proposed conjunctive operation rule was applied to the water supply system which is analogue to the area in northern Taiwan. The results showed that the MCORC could increase the efficiency of water use and reduce the risk of serious water deficits.

  17. Automatic Scheduling and Planning (ASAP) in future ground control systems

    NASA Technical Reports Server (NTRS)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  18. Linkages between sediment supply and channel morphology in gravel-bed river systems

    NASA Astrophysics Data System (ADS)

    Pitlick, John; Recking, Alain; Liebault, Fred

    2013-04-01

    Mountain river systems are characterized by a wide range of channel patterns and varying levels of instability. In steeper channels- torrents and cascades- resistant bed and bank materials tend to limit entrainment and transport, except during large floods or debris flows. In lower-gradient channels, with meandering or braided planforms, bed and bank materials are mobilized more frequently, consequently channel geometry is maintained by a long-term balance between bank erosion and the lateral migration and growth of bars. These differences in stability are largely a reflection of position with the drainage network, but other factors, such as valley confinement and drainage basin sediment supply (both quantity and grain size), play equally strong roles in the downstream evolution of channel morphology. In this talk we present data and preliminary results from a comparative study of the influences of sediment supply on channel morphology in rivers draining high-elevation basins in the Rocky Mountains and the French Alps. Study sites are located in river basins with high to very high relief (1000-3000 m), and hydrologic cycles dominated by snowmelt runoff. The scaling between peak flows and drainage basin area is very similar in both regions. There are sharp contrasts, however, in the underlying rock types, and the connectivity between hillslopes and channels, such that the sediment supply to rivers in high-relief areas of the French Alps is orders of magnitude higher than in the Rocky Mountain region. Rock type also influences the grain size and durability of the sediment delivered from hillslopes, thus sand and fine gravel are abundant in French alpine channels. The net effect of finer grain sizes in channels with steep slopes is to produce Shields numbers that are 2-3 times the threshold for motion at channel-forming discharges. These conditions are quite different from conditions in Rocky Mountain channels where the Shields numbers at bankfull flows are typically

  19. Modular Open System Architecture for Reducing Contamination Risk in the Space and Missile Defense Supply Chain

    NASA Technical Reports Server (NTRS)

    Seasly, Elaine

    2015-01-01

    To combat contamination of physical assets and provide reliable data to decision makers in the space and missile defense community, a modular open system architecture for creation of contamination models and standards is proposed. Predictive tools for quantifying the effects of contamination can be calibrated from NASA data of long-term orbiting assets. This data can then be extrapolated to missile defense predictive models. By utilizing a modular open system architecture, sensitive data can be de-coupled and protected while benefitting from open source data of calibrated models. This system architecture will include modules that will allow the designer to trade the effects of baseline performance against the lifecycle degradation due to contamination while modeling the lifecycle costs of alternative designs. In this way, each member of the supply chain becomes an informed and active participant in managing contamination risk early in the system lifecycle.

  20. Methods of reducing energy consumption of the oxidant supply system for MHD/steam power plants

    NASA Technical Reports Server (NTRS)

    Juhasz, A. J.

    1983-01-01

    An in-depth study was conducted to identify possible improvements to the oxidant supply system for combined cycle MHD power plants which would lead to higher thermal efficiency and reduction in the cost of electricity, COE. Results showed that the oxidant system energy consumption could be minimized when the process was designed to deliver a product O2 concentration of 70 mole percent. The study also led to the development of a new air separation process, referred to as 'liquid pumping and internal compression'. MHD system performance calculations show that the new process would permit an increase in plant thermal efficiency of 0.6 percent while allowing more favorable tradeoffs between magnetic energy and oxidant system capacity requirements.

  1. Methods of reducing energy consumption of the oxidant supply system for MHD/steam power plants

    NASA Technical Reports Server (NTRS)

    Juhasz, A. J.

    1983-01-01

    An in-depth study was conducted to identify possible improvements to the oxidant supply system for combined cycle MHD power plants which would lead to higher thermal efficiency and reduction in the cost of electricity, COE. Results showed that the oxidant system energy consumption could be minimized when the process was designed to deliver a product O2 concentration of 70 mole percent. The study also led to the development of a new air separation process, referred to as liquid pumping and internal compression. MHD system performance calculations show that the new process would permit an increase in plant thermal efficiency of 0.6 percent while allowing more favorable tradeoffs between magnetic energy and oxidant system capacity requirements.

  2. Tracking and Data Relay Satellite System (TDRSS) frequency plan

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The functions of the Tracking and Data Relay Satellite System (TDRSS) are discussed. The primary purpose of the system is to transmit signals to and receive signals from earth orbiting user spacecraft, and provide data from which user spacecraft ephemerides can be calculated. The system configuration is described and illustrated. The frequency plan is analyzed to show the frequency coverage and the signal handling capability of the system. The characteristics of the components of the system are tabulated.

  3. Planning and Resource Management in an Intelligent Automated Power Management System

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  4. A VMAT planning solution for prostate patients using a commercial treatment planning system.

    PubMed

    Boylan, C J; Golby, C; Rowbottom, C G

    2010-07-21

    Volumetric modulated arc therapy (VMAT) is a rotational delivery technique which offers the potential of improved dose distributions and shorter treatment times when compared to fixed-beam intensity-modulated radiation therapy (IMRT). This note describes the use of an existing treatment planning system (Philips Pinnacle(3) v.8.0), supplemented by in-house software, to produce a single-arc VMAT prostate plan. While a number of planning systems for the Elekta VMAT platform are commercially available, the use of an in-house solution has allowed more detailed investigations of VMAT planning, as well as greater control over the optimization process. The solution presented here begins with a static step-and-shoot IMRT approach to provide initial segment shapes, which are then modified and sequenced into 60 equally spaced control points in a 360 degrees arc. Dose-volume histogram comparisons demonstrate that this VMAT planning method offers multiple dose level target coverage comparable to that from a standard IMRT approach. The VMAT plans also show superior sparing of critical structures such as the rectum and bladder. Delivery times are reduced with the VMAT method, and the results of dosimetric verification, resilience and repeatability tests indicate that the solution is robust.

  5. Screening of sustainable groundwater sources for integration into a regional drought-prone water supply system

    NASA Astrophysics Data System (ADS)

    Stigter, T. Y.; Monteiro, J. P.; Nunes, L. M.; Vieira, J.; Cunha, M. C.; Ribeiro, L.; Nascimento, J.; Lucas, H.

    2009-01-01

    This paper reports on the qualitative and quantitative screening of groundwater sources for integration into the public water supply system of the Algarve, Portugal. The results are employed in a decision support system currently under development for an integrated water resources management scheme in the region. Such a scheme is crucial for several reasons, including the extreme seasonal and annual variations in rainfall, the effect of climate change on more frequent and long-lasting droughts, the continuously increasing water demand and the high risk of a single-source water supply policy. The latter was revealed during the severe drought of 2004 and 2005, when surface reservoirs were depleted and the regional water demand could not be met, despite the drilling of emergency wells. For screening and selection, quantitative criteria are based on aquifer properties and well yields, whereas qualitative criteria are defined by water quality indices. These reflect the well's degree of violation of drinking water standards for different sets of variables, including toxicity parameters, nitrate and chloride, iron and manganese and microbiological parameters. Results indicate the current availability of at least 1100 l s-1 of high quality groundwater (55% of the regional demand), requiring only disinfection (900 l s-1) or basic treatment, prior to human consumption. These groundwater withdrawals are sustainable when compared to mean annual recharge, considering that at least 40% is preserved for ecological demands. A more accurate and comprehensive analysis of sustainability is performed with the help of steady-state and transient groundwater flow simulations, which account for aquifer geometry, boundary conditions, recharge and discharge rates, pumping activity and seasonality. They permit an advanced analysis of present and future scenarios and show that increasing water demands and decreasing rainfall will make the water supply system extremely vulnerable, with a high

  6. Screening of sustainable groundwater sources for integration into a regional drought-prone water supply system

    NASA Astrophysics Data System (ADS)

    Stigter, T. Y.; Monteiro, J. P.; Nunes, L. M.; Vieira, J.; Cunha, M. C.; Ribeiro, L.; Nascimento, J.; Lucas, H.

    2009-07-01

    This paper reports on the qualitative and quantitative screening of groundwater sources for integration into the public water supply system of the Algarve, Portugal. The results are employed in a decision support system currently under development for an integrated water resources management scheme in the region. Such a scheme is crucial for several reasons, including the extreme seasonal and annual variations in rainfall, the effect of climate change on more frequent and long-lasting droughts, the continuously increasing water demand and the high risk of a single-source water supply policy. The latter was revealed during the severe drought of 2004 and 2005, when surface reservoirs were depleted and the regional water demand could not be met, despite the drilling of emergency wells. For screening and selection, quantitative criteria are based on aquifer properties and well yields, whereas qualitative criteria are defined by water quality indices. These reflect the well's degree of violation of drinking water standards for different sets of variables, including toxicity parameters, nitrate and chloride, iron and manganese and microbiological parameters. Results indicate the current availability of at least 1100 l s-1 of high quality groundwater (55% of the regional demand), requiring only disinfection (900 l s-1) or basic treatment, prior to human consumption. These groundwater withdrawals are sustainable when compared to mean annual recharge, considering that at least 40% is preserved for ecological demands. A more accurate and comprehensive analysis of sustainability is performed with the help of steady-state and transient groundwater flow simulations, which account for aquifer geometry, boundary conditions, recharge and discharge rates, pumping activity and seasonality. They permit an advanced analysis of present and future scenarios and show that increasing water demands and decreasing rainfall will make the water supply system extremely vulnerable, with a high

  7. Long-term climate sensitivity of an integrated water supply system: The role of irrigation.

    PubMed

    Guyennon, Nicolas; Romano, Emanuele; Portoghese, Ivan

    2016-09-15

    The assessment of the impact of long-term climate variability on water supply systems depends not only on possible variations of the resources availability, but also on the variation of the demand. In this framework, a robust estimation of direct (climate induced) and indirect (anthropogenically induced) effects of climate change is mandatory to design mitigation measures, especially in those regions of the planet where the groundwater equilibrium is strongly perturbed by exploitations for irrigation purposes. The main goal of this contribution is to propose a comprehensive model that integrates distributed crop water requirements with surface and groundwater mass balance, able to consider management rules of the water supply system. The proposed overall model, implemented, calibrated and validated for the case study of the Fortore water supply system (Apulia region, South Italy), permits to simulate the conjunctive use of the water from a surface artificial reservoir and from groundwater. The relative contributions of groundwater recharges and withdrawals to the aquifer stress have been evaluated under different climate perturbations, with emphasis on irrigation practices. Results point out that irrigated agriculture primarily affects groundwater discharge, indicating that ecosystem services connected to river base flow are particularly exposed to climate variation in irrigated areas. Moreover, findings show that the recharge both to surface and to groundwater is mainly affected by drier climate conditions, while hotter conditions have a major impact on the water demand. The non-linearity arising from combined drier and hotter conditions may exacerbate the aquifer stress by exposing it to massive sea-water intrusion. PMID:27161129

  8. Strategic planning--a plan for excellence for South Haven Health System.

    PubMed

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  9. Motion planning for variable inertia mechanical systems

    NASA Astrophysics Data System (ADS)

    Shammas, Elie A.; Choset, Howie; Rizzi, Alfred A.

    2006-05-01

    In this paper, we generate gaits for mixed systems, that is, dynamic systems that are subject to a set of nonholonomic constraints. What is unique about mixed systems is that when we express their dynamics in body coordinates, the motion of these systems can be attributed to two decoupled terms: the geometric and dynamic phase shifts. In our prior work, we analyzed systems whose dynamic phase shift was null by definition. Purely mechanical and principally kinematic systems are two classes of mechanical systems that have this property. We generated gaits for these two classes of systems by intuitively evaluating their geometric phase shift and relating it to a volume integral under well-defined height functions. One of the contributions of this paper is to present a similar intuitive approach for computing the dynamic phase shift. We achieve this, by introducing a new scaled momentum variable that not only simplifies the momentum evolution equation but also allows us to introduce a new set of well-defined gamma functions which enable us to intuitively evaluate the dynamic phase shift. More specifically, by analyzing these novel gamma functions in a similar way to how we analyzed height functions, and by analyzing the sign-definiteness of the scaled momentum variable, we are able to ensure that the dynamic phase shift is non-zero solely along the desired fiber direction. Finally, we also introduce a novel mechanical system, the variable inertia snakeboard, which is a generalization of the original snakeboard that was previously studied in the literature. Not only does this general system help us identify regions of the base space where we can not define a certain type of gaits, but also it helps us verify the generality and applicability of our gait generation approach.

  10. Operational results for the raster scanning power supply system constructed at the Bevalac Biomedical Facility

    SciTech Connect

    Stover, G.; Halliwell, J.; Nyman, M.; Dwinell, R.

    1989-03-01

    A raster scanning power supply for controlling an 8.0 Tesla-meter relativistic heavy-ion beam at the Biomedical Facility has been recently completed and is undergoing electrical testing before on- line operation in 1989. The scanner system will provide tightly controlled beam uniformity and off-axis treatment profiles with large aspect ratios and unusual dimensions. This article will discuss original specifications, agreement with measured results and special device performance (i.e. GTOs, FET actuator assembly, etc.). 5 refs., 4 figs.

  11. KEY DESIGN REQUIREMENTS FOR THE HIGH TEMPERATURE GAS-COOLED REACTOR NUCLEAR HEAT SUPPLY SYSTEM

    SciTech Connect

    L.E. Demick

    2010-09-01

    Key requirements that affect the design of the high temperature gas-cooled reactor nuclear heat supply system (HTGR-NHSS) as the NGNP Project progresses through the design, licensing, construction and testing of the first of a kind HTGR based plant are summarized. These requirements derive from pre-conceptual design development completed to-date by HTGR Suppliers, collaboration with potential end users of the HTGR technology to identify energy needs, evaluation of integration of the HTGR technology with industrial processes and recommendations of the NGNP Project Senior Advisory Group.

  12. FIRE HAZARDS ANALYSIS FOR THE FUEL SUPPLY SYSTEM - ESF PACKAGE 1E

    SciTech Connect

    N.M. Ruonavaara

    1995-04-12

    The purpose of the fire hazards analysis is to comprehensively assess the risk from fire within individual fire areas in accordance with US. Department of Energy (DOE) Order 5480.7h (Reference 4.4.7.4). This document will assess the fire hazard risk within the Exploratory Studies Facility (ESF) fuel supply system, Package 1E, and evaluate whether the following objectives are met: (1) Ensure that property damage from fire and related perils do not exceed an acceptable level. (2) Provide input to the facility Safety Analysis Report (SAR).

  13. Fuel cell and system for supplying electrolyte thereto with wick feed

    DOEpatents

    Cohn, J. Gunther; Feigenbaum, Haim; Kaufman, Arthur

    1984-01-01

    An electrolyte distribution and supply system for use with a fuel cell having a means for drawing electrolyte therein is formed by a set of containers of electrolyte joined to respective fuel cells in a stack of such cells. The electrolyte is separately stored so as to provide for electrical isolation between electrolytes of the individual cells of the stack. Individual storage compartments are coupled by tubes containing wicking fibers, the ends of the respective tubes terminating on the means for drawing electrolyte in each of the respective fuel cells. Each tube is heat shrunk to tightly bind the fibers therein.

  14. Intelligent Planning and Scheduling for Controlled Life Support Systems

    NASA Technical Reports Server (NTRS)

    Leon, V. Jorge

    1996-01-01

    Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

  15. A simple planning technique of craniospinal irradiation in the eclipse treatment planning system

    PubMed Central

    Athiyaman, Hemalatha; Mayilvaganan, Athiyaman; Singh, Daleep

    2014-01-01

    A new planning method for Craniospinal Irradiation by Eclipse treatment planning system using Field alignment, Field-in-Field technique was developed. Advantage of this planning method was also studied retrospectively for previously treated five patients of medulloblastoma with variable spine length. Plan consists of half beam blocked parallel opposed cranium, and a single posterior cervicospine field was created by sharing the same isocenter, which obviates divergence matching. Further, a single symmetrical field was created to treat remaining Lumbosacral spine. Matching between a inferior diverging edge of cervicospine field and superior diverging edge of a Lumbosacral field was done using the field alignment option. ′Field alignment′ is specific option in the Eclipse Treatment Planning System, which automatically matches the field edge divergence as per field alignment rule. Multiple segments were applied in both the spine field to manage with hot and cold spots created by varying depth of spinal cord. Plan becomes fully computerized using this field alignment option and multiple segments. Plan evaluation and calculated mean modified Homogeneity Index (1.04 and 0.1) ensured that dose to target volume is homogeneous and critical organ doses were within tolerance. Dose variation at the spinal field junction was verified using ionization chamber array (I′MatriXX) for matched, overlapped and gap junction spine fields; the delivered dose distribution confirmed the ideal clinical match, over exposure and under exposure at the junction, respectively. This method is simple to plan, executable in Record and Verify mode and can be adopted for various length of spinal cord with only two isocenter in shorter treatment time. PMID:25525314

  16. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  17. Very low noise AC/DC power supply systems for large detector arrays

    NASA Astrophysics Data System (ADS)

    Arnaboldi, C.; Baù, A.; Carniti, P.; Cassina, L.; Giachero, A.; Gotti, C.; Maino, M.; Passerini, A.; Pessina, G.

    2015-12-01

    In this work, we present the first part of the power supply system for the CUORE and LUCIFER arrays of bolometric detectors. For CUORE, it consists of AC/DC commercial power supplies (0-60 V output) followed by custom DC/DC modules (48 V input, ±5 V to ±13.5 V outputs). Each module has 3 floating and independently configurable output voltages. In LUCIFER, the AC/DC + DC/DC stages are combined into a commercial medium-power AC/DC source. At the outputs of both setups, we introduced filters with the aim of lowering the noise and to protect the following stages from high voltage spikes that can be generated by the energy stored in the cables after the release of accidental short circuits. Output noise is very low, as required: in the 100 MHz bandwidth the RMS level is about 37 μVRMS (CUORE setup) and 90 μVRMS (LUCIFER setup) at a load of 7 A, with a negligible dependence on the load current. Even more importantly, high frequency switching disturbances are almost completely suppressed. The efficiency of both systems is above 85%. Both systems are completely programmable and monitored via CAN bus (optically coupled).

  18. Presence of potential bacterial pathogens in a municipal drinking water supply system.

    PubMed

    Felföldi, T; Tarnóczai, Tímea; Homonnay, Z G

    2010-09-01

    The quality of drinking water is a major public concern, but the detection of most potential pathogens is not always included in drinking water hygienic monitoring or is only assessed with highly biased cultivation-based methods. In this study, the occurrence of Pseudomonas aeruginosa and Legionella spp. was examined with taxon-specific PCRs in samples taken at ten points of a municipal drinking water supply system in three months. Sequence analysis confirmed the positivity of samples and revealed a diverse community of legionellae. The results showed that chlorination was an important and effective disinfection method against pathogenic bacteria in drinking water, but pathogenic bacteria could reoccur in the system farther away from the chlorination point. No strong correlation was found between the presence of the investigated potentially pathogenic bacteria and the measured abiotic and biotic parameters within the investigated range. It is hypothesized that instead of physicochemical parameters, the main factors influencing the presence of pathogens in the drinking water were rather the composition of the microbial community, the biotic interactions between individual non-pathogenic and pathogenic microorganisms (competition or promotion of growth) and the structure of biofilm grown on the inner surface of the supply system.

  19. Space Station Mission Planning System (MPS) development study. Volume 2

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The process and existing software used for Spacelab payload mission planning were studied. A complete baseline definition of the Spacelab payload mission planning process was established, along with a definition of existing software capabilities for potential extrapolation to the Space Station. This information was used as a basis for defining system requirements to support Space Station mission planning. The Space Station mission planning concept was reviewed for the purpose of identifying areas where artificial intelligence concepts might offer substantially improved capability. Three specific artificial intelligence concepts were to be investigated for applicability: natural language interfaces; expert systems; and automatic programming. The advantages and disadvantages of interfacing an artificial intelligence language with existing FORTRAN programs or of converting totally to a new programming language were identified.

  20. The Design and Tests of Battery Power Supply System for Pulsed Flat-Top Magnets in WHMFC

    NASA Astrophysics Data System (ADS)

    Ding, T. H.; Lv, Y. L.; Tang, J. X.; Chen, X.; Chen, X. Y.; Li, L.; Pan, Y.

    2013-03-01

    A capacitor bank power supply of 14.8 MJ is built in Wuhan National Pulsed High Magnetic Field Center (WHMFC). Another pulse generator power supply of 100 MJ/100 MVA is expected to be finished by the end of August, 2012. These power supplies can drive pulsed magnets with a magnetic field of 50 T to 80 T and a pulse duration of 15 ms to 1000 ms (Li et al. in IEEE Trans. Appl. Supercond. 18:596, 2008). In addition to that, a new battery bank power supply system is also designed. This system can output a maximum voltage of 1000 V, a maximum current of 40 kA and a pulse duration of 2 s to feed pulsed flat-top magnets of 40 T/2 s. This power supply consists of battery bank and its charger, thyristor DC switch and its forced commutation, DC breaker, control system, Crowbar, PWM controller and magnet. The battery bank uses 945 lead-acid batteries and its modular design makes it easy to modify the voltage and current of the power supply by changing the connections of the batteries based on the requirement of single-coil, double-coil and triple-coil magnets. The design and primary tests of the battery power supply system will be introduced in this paper (Schillig et al. in IEEE Trans. Appl. Supercond. 10:526, 2000).