Sample records for supply system projects

  1. Research on Comprehensive Evaluation Method for Heating Project Based on Analytic Hierarchy Processing

    NASA Astrophysics Data System (ADS)

    Han, Shenchao; Yang, Yanchun; Liu, Yude; Zhang, Peng; Li, Siwei

    2018-01-01

    It is effective to reduce haze in winter by changing the distributed heat supply system. Thus, the studies on comprehensive index system and scientific evaluation method of distributed heat supply project are essential. Firstly, research the influence factors of heating modes, and an index system with multiple dimension including economic, environmental, risk and flexibility was built and all indexes were quantified. Secondly, a comprehensive evaluation method based on AHP was put forward to analyze the proposed multiple and comprehensive index system. Lastly, the case study suggested that supplying heat with electricity has great advantage and promotional value. The comprehensive index system of distributed heating supply project and evaluation method in this paper can evaluate distributed heat supply project effectively and provide scientific support for choosing the distributed heating project.

  2. Finance and supply management project execution plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  3. On adaptive modified projective synchronization of a supply chain management system

    NASA Astrophysics Data System (ADS)

    Tirandaz, Hamed

    2017-12-01

    In this paper, the synchronization problem of a chaotic supply chain management system is studied. A novel adaptive modified projective synchronization method is introduced to control the behaviour of the leader supply chain system by a follower chaotic system and to adjust the leader system parameters until the measurable errors of the system parameters converge to zero. The stability evaluation and convergence analysis are carried out by the Lyapanov stability theorem. The proposed synchronization and antisynchronization techniques are studied for identical supply chain chaotic systems. Finally, some numerical simulations are presented to verify the effectiveness of the theoretical discussions.

  4. World Energy Projection System Plus (WEPS ): Global Activity Module

    EIA Publications

    2016-01-01

    The World Energy Projection System Plus (WEPS ) is a comprehensive, mid?term energy forecasting and policy analysis tool used by EIA. WEPS projects energy supply, demand, and prices by country or region, given assumptions about the state of various economies, international energy markets, and energy policies. The Global Activity Module (GLAM) provides projections of economic driver variables for use by the supply, demand, and conversion modules of WEPS . GLAM’s baseline economic projection contains the economic assumptions used in WEPS to help determine energy demand and supply. GLAM can also provide WEPS with alternative economic assumptions representing a range of uncertainty about economic growth. The resulting economic impacts of such assumptions are inputs to the remaining supply and demand modules of WEPS .

  5. The Timber Resource Inventory Model (TRIM): a projection model for timber supply and policy analysis.

    Treesearch

    P.L. Tedder; R.N. La Mont; J.C. Kincaid

    1987-01-01

    TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...

  6. Water-Resources Manpower: Supply and Demand Patterns to 1980.

    ERIC Educational Resources Information Center

    Lewis, James E.

    Relating the supply of scientific manpower to the educational potential of the general population and the productive capacity of the educational system, this study disaggregates independent projections of scientific manpower supply and demand to yield projections for water resources manpower. This supply of engineers, natural scientists, and…

  7. 76 FR 53021 - Public Hearing and Commission Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ... Water Supply System, Halls Cross Roads District, Harford County, Md. Modification to conditions of the... Baltimore. Project Facility: Maryland Water Supply System, Halls Cross Roads District, Harford County, Md... Facility: Maryland Water Supply System, Halls Cross Roads District, Harford County, Md. Modification to...

  8. Collaborative Learning in Advanced Supply Systems: The KLASS Pilot Project.

    ERIC Educational Resources Information Center

    Rhodes, Ed; Carter, Ruth

    2003-01-01

    The Knowledge and Learning in Advanced Supply Systems (KLASS) project developed collaborative learning networks of suppliers in the British automotive and aerospace industries. Methods included face-to-face and distance learning, work toward National Vocational Qualifications, and diagnostic workshops for senior managers on improving quality,…

  9. Real-time operating system for selected Intel processors

    NASA Technical Reports Server (NTRS)

    Pool, W. R.

    1980-01-01

    The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.

  10. 77 FR 75915 - Review and Approval of Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... provide source water to a public water supply system. Likewise, a groundwater withdrawal that impacts a... withdrawn, or would be used to provide source water to a public water supply system. Language is also included that provides that withdrawals by public water supply systems shall be limited for use within the...

  11. 75 FR 82389 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... (HP) vertical hollow shaft electric motor, for use in a water supply well. The 15 HP vertical hollow... percent. The District's water system improvement project includes the development of a new water supply... use in a water supply well. Therefore, EPA Region 6 concludes that the District meets the...

  12. 75 FR 36301 - Review and Approval of Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... Basin Commission (Commission) to: Include subsidiary allocations for public water supply systems under... or removal of water by a public water supplier indirectly through another public water supply system... applications that do not involve a withdrawal (such as those supplied by a public water supplier), newspaper...

  13. Technoeconomic assumptions adopted for the development of a long-term electricity supply model for Cyprus.

    PubMed

    Taliotis, Constantinos; Taibi, Emanuele; Howells, Mark; Rogner, Holger; Bazilian, Morgan; Welsch, Manuel

    2017-10-01

    The generation mix of Cyprus has been dominated by oil products for decades. In order to conform with European Union and international legislation, a transformation of the supply system is called for. Energy system models can facilitate energy planning into the future, but a large volume of data is required to populate such models. The present data article provides information on key modelling assumptions and input data adopted with the aim of representing the electricity supply system of Cyprus in a separate research article. Data in regards to renewable energy technoeconomic characteristics and investment cost projections, fossil fuel price projections, storage technology characteristics and system operation assumptions are described in this article.

  14. Optimal pipe size design for looped irrigation water supply system using harmony search: Saemangeum project area.

    PubMed

    Yoo, Do Guen; Lee, Ho Min; Sadollah, Ali; Kim, Joong Hoon

    2015-01-01

    Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply.

  15. Optimal Pipe Size Design for Looped Irrigation Water Supply System Using Harmony Search: Saemangeum Project Area

    PubMed Central

    Lee, Ho Min; Sadollah, Ali

    2015-01-01

    Water supply systems are mainly classified into branched and looped network systems. The main difference between these two systems is that, in a branched network system, the flow within each pipe is a known value, whereas in a looped network system, the flow in each pipe is considered an unknown value. Therefore, an analysis of a looped network system is a more complex task. This study aims to develop a technique for estimating the optimal pipe diameter for a looped agricultural irrigation water supply system using a harmony search algorithm, which is an optimization technique. This study mainly serves two purposes. The first is to develop an algorithm and a program for estimating a cost-effective pipe diameter for agricultural irrigation water supply systems using optimization techniques. The second is to validate the developed program by applying the proposed optimized cost-effective pipe diameter to an actual study region (Saemangeum project area, zone 6). The results suggest that the optimal design program, which applies an optimization theory and enhances user convenience, can be effectively applied for the real systems of a looped agricultural irrigation water supply. PMID:25874252

  16. 75 FR 29307 - Web Based Supply Chain Management Commodity Offer Form, Paperwork Collection Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Doc. No FV10-CP-01, AMS-FV-10-0041] Web... collection request is required for the implementation of a new system named Web Based Supply Chain Management...-2782. Mail: David Tuckwiller, Project Manager, Web Based Supply Chain Management System, Agricultural...

  17. Water use trends and demand projections in the Northwest Florida Water Management District

    USGS Publications Warehouse

    Marella, R.L.; Mokray, M.F.; Hallock-Solomon, Michael

    1998-01-01

    The Northwest Florida Water Management District is located in the western panhandle of Florida and encompasses about 11,200 square miles. In 1995, the District had an estimated population of 1.13 million, an increase of about 47 percent from the 1975 population of 0.77 million. Over 50 percent of the resident population lives within 10 miles of the coast. In addition, hundreds of thousands of visitors come to the coastal areas of the panhandle during the summer months for recreation or vacation purposes. Water withdrawn to meet demands for public supply, domestic self-supplied, commercial-industrial, agricultural irrigation, and recreational irrigation purposes in the District increased 18 percent (52 million gallons per day) between 1970 and 1995. The greatest increases were for public supply and domestic self-supplied (99 percent increase) and for agricultural irrigation (60 percent increase) between 1970 and 1995. In 1995, approximately 70 percent of the water withdrawn was from ground-water sources, with the majority of this from the Floridan aquifer system. The increasing water demands have affected water levels in the Floridan aquifer system, especially along the coastal areas. The Northwest Florida Water Management District is mandated under the Florida Statutes (Chapter 373) to protect and manage the water resources in this area of the State. The mandate requires that current and future water demands be met, while water resources and water-dependent natural systems are sustained. For this project, curve fitting and extrapolation were used to project most of the variables (population, population served by public supply, and water use) to the years 2000, 2005, 2010, 2015, and 2020. This mathematical method involves fitting a curve to historical population or water-use data and then extending this curve to arrive at future values. The population within the region is projected to reach 1,596,888 by the year 2020, an increase of 41 percent between 1995 and 2020. Most of the population in this region will continue to reside in the urban areas of Pensacola and Tallahassee, and along the coastal areas. The population served by public water supply is projected to reach 1,353,836 by the year 2020, an increase of nearly 46 percent between 1995 and 2020. Total water demand for the Northwest Florida Water Management District is projected to reach 940.2 million gallons per day in 2000, 1,003.1 million gallons per day in 2010, and 1,059.1 million gallons per day in 2020. Excluding water withdrawn for power generation from these totals, water demands will increase 34 percent between 1995 and 2020, and 58 percent between 1970 and 2020. Specifically, public supply demands are projected to increase 74.1 million gallons per day (53 percent) and domestic self-supplied and small public supply systems demands are projected to increase 9.1 million gallons per day (28 percent) between 1995 and 2020. Commercial- industrial self-supplied demands are projected to increase about 16.9 million gallons per day (13 percent) between 1995 and 2020. Agricultural and recreational irrigation demands combined are projected to increase 16.8 million gallons per day (48 percent) between 1995 and 2020. Water demands for power generation are projected to increase about 53.9 million gallons per day (10 percent) between 1995 and 2020. Although power generation water use shows a projected increase during this time, plant capacities are not expected to change dramatically.

  18. Evaluation of Supply Chain Management Systems Used in Civil Engineering

    NASA Astrophysics Data System (ADS)

    Tomczak, Michał; Rzepecki, Łukasz

    2017-10-01

    One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP. The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.

  19. A decision support system for transportation infrastructure and supply chain system planning.

    DOT National Transportation Integrated Search

    2013-07-01

    This project makes the results (models and methodology) of the research and development efforts on freight movement modeling (FMM) and supply chain design carried out by faculty at OSU and OU available to transportation and logistics professionals. A...

  20. Water Systems Project 1: Current Systems and Regulatory Support

    EPA Science Inventory

    Water Systems Project 1 objectives: 1) Supply research results to support federal regulations and guidance; 2) provide strategies to regions, states, and communities for improved regulatory compliance, and 3) provide rapid and effective emergency response where appropriate (e.g. ...

  1. NASA Ames Research Center 60 MW Power Supply Modernization

    NASA Technical Reports Server (NTRS)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  2. 76 FR 30936 - West Maui Pumped Storage Water Supply, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... Storage Water Supply, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...-acre reservoir; (4) a turnout to supply project effluent water to an existing irrigation system; (5) a...,000 megawatt-hours. Applicant Contact: Bart M. O'Keeffe, West Maui Pumped Storage Water Supply, LLC, P...

  3. A modeling framework for evaluating the drought resilience of a surface water supply system under non-stationarity

    DOE PAGES

    Zhao, Gang; Gao, Huilin; Kao, Shih -Chieh; ...

    2018-05-23

    Here, the future resilience of water supply systems is unprecedentedly challenged by non-stationary processes, such as fast population growth and a changing climate. A thorough understanding of how these non-stationarities impact water supply resilience is vital to support sustainable decision making, particularly for large cities in arid and/or semi-arid regions. In this study, a novel modeling framework, which integrates hydrological processes and water management, was established over a representative water limited metropolitan area to evaluate the impacts of water availability and water demand on reservoir storage and water supply reliability. In this framework, climate change induced drought events were selectedmore » from statistically downscaled Coupled Model Intercomparison Project Phase 5 outputs under the Representative Concentration Pathway 8.5 scenario, while future water demand was estimated by the product of projected future population and per capita water use. Compared with the first half of the 21st century (2000–2049), reservoir storage and water supply reliability during the second half century (2050–2099) are projected to reduce by 16.1% and 14.2%, respectively. While both future multi-year droughts and population growth will lower water supply resilience, the uncertainty associated with future climate projection is larger than that associated with urbanization. To reduce the drought risks, a combination of mitigation strategies (e.g., additional conservation, integrating new water sources, and water use redistribution) was found to be the most efficient approach and can significantly improve water supply reliability by as much as 15.9%.« less

  4. A modeling framework for evaluating the drought resilience of a surface water supply system under non-stationarity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhao, Gang; Gao, Huilin; Kao, Shih -Chieh

    Here, the future resilience of water supply systems is unprecedentedly challenged by non-stationary processes, such as fast population growth and a changing climate. A thorough understanding of how these non-stationarities impact water supply resilience is vital to support sustainable decision making, particularly for large cities in arid and/or semi-arid regions. In this study, a novel modeling framework, which integrates hydrological processes and water management, was established over a representative water limited metropolitan area to evaluate the impacts of water availability and water demand on reservoir storage and water supply reliability. In this framework, climate change induced drought events were selectedmore » from statistically downscaled Coupled Model Intercomparison Project Phase 5 outputs under the Representative Concentration Pathway 8.5 scenario, while future water demand was estimated by the product of projected future population and per capita water use. Compared with the first half of the 21st century (2000–2049), reservoir storage and water supply reliability during the second half century (2050–2099) are projected to reduce by 16.1% and 14.2%, respectively. While both future multi-year droughts and population growth will lower water supply resilience, the uncertainty associated with future climate projection is larger than that associated with urbanization. To reduce the drought risks, a combination of mitigation strategies (e.g., additional conservation, integrating new water sources, and water use redistribution) was found to be the most efficient approach and can significantly improve water supply reliability by as much as 15.9%.« less

  5. Methods for improving bicycle sharing system balance.

    DOT National Transportation Integrated Search

    2016-12-02

    Many cities have developed bicycle sharing systems. This project points out that a key element in their : success and sustainability is an understanding of the spatial patterns of supply and demand. This project : tackles the rebalancing issue whe...

  6. Successful Rural Water Supply Projects and the Concerns of Women. Women in Development.

    ERIC Educational Resources Information Center

    Roark, Paula

    As the traditional water carriers and water managers, third world women are crucial to the success of rural water supply projects whose short term goal is increased water quality and quantity and whose long term goal is improved family health. Change depends on the utilization of local learning systems of the society and women are most often the…

  7. 7 CFR 1710.300 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; (12) A discussion of the historical experience of the borrower, and in the case of a power supply... ability of the borrower, and in the case of a power supply borrower its member systems, to compete with... regional office will consult with the Power Supply Division in the case of generation projects for...

  8. Solar battery power supply: A reliable power supply system for nursing clinic in Australia`s remote areas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zahedi, A.

    Design and performance investigation of a new solar-battery system to power health clinics in Australia`s remote and isolated areas is a research project being conducted in the Department. The objective of this paper is to present the solar-battery system and to discuss the design factors of the system.

  9. Texas Supply/Demand Information System for Vocational Education. Final Report.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    Principal objectives of a Texas project conducted from July 1974 through December 1976 were to complete the research, development, and implementation of statewide matching of supply by occupation (those available for employment) to demand by occupation (employment opportunities). The problem was approached through a modular system consisting of…

  10. Potable water supply in U.S. manned space missions

    NASA Technical Reports Server (NTRS)

    Sauer, Richard L.; Straub, John E., II

    1992-01-01

    A historical review of potable water supply systems used in the U.S. manned flight program is presented. This review provides a general understanding of the unusual challenges these systems have presented to the designers and operators of the related flight hardware. The presentation concludes with the projection of how water supply should be provided in future space missions - extended duration earth-orbital and interplanetary missions and lunar and Mars habitation bases - and the challenges to the biomedical community that providing these systems can present.

  11. POWER SUPPLY CONTROL AND MONITORING FOR THE SNS RING AND TRANSPORT SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LAMBIASE,R.; OERTER,B.; PENG,S.

    2001-06-28

    There are approximately 300 magnet power supplies in the SNS accumulator ring and transport lines. Control and monitoring of the these converters will be primarily accomplished with a new Power Supply Interface and Controller (PSI/PSC) system developed for the SNS project. This PSI/PSC system provides all analog and digital commands and status readbacks in one fiber isolated module. With a maximum rate of 10KHz, the PSI/PSC must be supplemented with higher speed systems for the wide bandwidth pulsed injection supplies, and the even wider bandwidth extraction kickers. This paper describes the implementation of this PSI/PSC system, which was developed throughmore » an industry/laboratory collaboration, and the supplementary equipment used to support the wider bandwidth pulsed supplies.« less

  12. Development and Evaluation of Control System for Microgrid Supplying Heat and Electricity

    NASA Astrophysics Data System (ADS)

    Kojima, Yasuhiro; Koshio, Masanobu; Nakamura, Shizuka

    Photovoltaic (PV) and Wind Turbine (WT) generation systems are expected to offer solutions to reduce green house gases and become more widely used in the future. However, the chief technical drawback of using these kinds of weather-dependent generators is the difficulty of forecasting their output, which can have negative impacts on commercial grids if a large number of them are introduced. Thus, this problem may hinder the wider application of PV and WT generation systems. The Regional Power Grid with Renewable Energy Resources Project was launched to seek a solution to this problem. The scope of the project is to develop, operate, and evaluate a Dispersed Renewable Energy Supply System with the ability to adapt the total energy output in response to changes in weather and demand. Such a system would reduce the impact that PV and WT generation systems have on commercial grids and allow the interconnection of more Dispersed Energy Resources (DER). In other words, the main objective of this project is to demonstrate an integrated energy management system, or a type of microgrid [1], as a new way of introducing DERs. The system has been in operation since October 2005 and will continue operation until March 2008. Through the project period, the data on power quality, system efficiency, operation cost, and environmental burden will be gathered and a cost-benefit analysis of the system will be undertaken. In this paper, firstly we introduce the concept of microgrid for reducing negative impact of natural energy, and secondly illustrate the structure of electric and thermal supply control system for Microgrid, especially for the Hachinohe demonstration project. The control system consists of four stages; weekly operation planning, economic dispatching control, tie-line control and local frequency control. And finally demonstration results and evaluation results are shown.

  13. Geolocation Support for Water Supply and Sewerage Projects in Azerbaijan

    NASA Astrophysics Data System (ADS)

    Qocamanov, M. H.; Gurbanov, Ch. Z.

    2016-10-01

    Drinking water supply and sewerage system designing and reconstruction projects are being extensively conducted in Azerbaijan Republic. During implementation of such projects, collecting large amount of information about the area and detailed investigations are crucial. Joint use of the aerospace monitoring and GIS play an essential role for the studies of the impact of environmental factors, development of the analytical information systems and others, while achieving the reliable performance of the existing and designed major water supply pipelines, as well as construction and exploitation of the technical installations. With our participation the GIS has been created in "Azersu" OJSC that includes systematic database of the drinking water supply and sewerage system, and rain water networks to carry out necessary geo information analysis. GIScreated based on "Microstation" platform and aerospace data. Should be mentioned that, in the country, specifically in large cities (i.e. Baku, Ganja, Sumqait, etc.,) drinking water supply pipelines cross regions with different physico-geographical conditions, geo-morphological compositions and seismotectonics.Mains water supply lines in many accidents occur during the operation, it also creates problems with drinking water consumers. In some cases the damage is caused by large-scale accidents. Long-term experience gives reason to say that the elimination of the consequences of accidents is a major cost. Therefore, to avoid such events and to prevent their exploitation and geodetic monitoring system to improve the rules on key issues. Therefore, constant control of the plan-height positioning, geodetic measurements for the detailed examination of the dynamics, repetition of the geodetic measurements for certain time intervals, or in other words regular monitoring is very important. During geodetic monitoring using the GIS has special significance. Given that, collecting geodetic monitoring measurements of the main pipelines on the same coordinate system and processing these data on a single GIS system allows the implementation of overall assessment of plan-height state of major water supply pipeline network facilities and the study of the impact of water supply network on environment and alternatively, the impact of natural processes on major pipeline.

  14. Status of a Power Processor for the Prometheus-1 Electric Propulsion System

    NASA Technical Reports Server (NTRS)

    Pinero, Luis R.; Hill, Gerald M.; Aulisio, Michael; Gerber, Scott; Griebeler, Elmer; Hewitt, Frank; Scina, Joseph

    2006-01-01

    NASA is developing technologies for nuclear electric propulsion for proposed deep space missions in support of the Exploration initiative under Project Prometheus. Electrical power produced by the combination of a fission-based power source and a Brayton power conversion and distribution system is used by a high specific impulse ion propulsion system to propel the spaceship. The ion propulsion system include the thruster, power processor and propellant feed system. A power processor technology development effort was initiated under Project Prometheus to develop high performance and lightweight power-processing technologies suitable for the application. This effort faces multiple challenges including developing radiation hardened power modules and converters with very high power capability and efficiency to minimize the impact on the power conversion and distribution system as well as the heat rejection system. This paper documents the design and test results of the first version of the beam supply, the design of a second version of the beam supply and the design and test results of the ancillary supplies.

  15. Factors that affect public-supply water use in Florida, with a section on projected water use to the year 2020

    USGS Publications Warehouse

    Marella, R.L.

    1992-01-01

    Public-supply water use in Florida increased 242 percent between 1960 and 1987 from 530 Mgal/d (million gallons per day) to 1,811 Mgal/d. This change is primarily a result of increases in population and tourism since 1960. Public-supply utilities provide water to a variety of users. In 1985, 71 percent of the water used for public supply was delivered for residential uses, 15 percent for commercial uses, 9 percent for industrial uses, and the remaining 5 percent for public use or other uses. Residential use of public-supply water in Florida has increased nearly 280 Mgal/d, but has decreased in the proportion of total deliveries from 80 to 71 percent between 1975 and 1985. This trend resulted from increased tourism and related commercial services associated with population and visitors. One of several factors that influences public-supply water use in Florida is the increase in resident population, which increased from 4.95 million in 1960 to more than 12.0 million in 1987. Additionally, Florida's nonresident population increased from 18.8 million visitors in 1977, to 34.1 million visitors in 1987, and the part of Florida?s population that relies on public-supply water increased from 68 percent in 1960, to 86 percent in 1987. The public supply per capita use was multiplied by the projected populations for each county for the years 2000, 2010, and 2020 to forecast public-supply water use. Using medium projections, Florida?s population is expected to increase to nearly 16 million in the year 2000, to 18 million in the year 2010, and to almost 20 million in the year 2020, of which an estimated 13.5 million people will be supplied water from public-supply water systems in the year 2000, 15 million in 2010, and nearly 17 million by the year 2020. Public-supply water use is expected to increase to a projected (medium) 2,310 Mgal/d in the year 2000, 2,610 Mgal/d in the year 2010, and 2,890 Mgal/d in the year 2020. If the population exceeds the medium projections for the years 2000, 2010, and 2020, high projections estimate public-supply water use could reach 2,570 Mgal/d in 2000, 3,210 Mgal/d in 2010, and 3,900 Mgal/d in 2020. Palm Beach County is projected to have the largest increase in public-supply water use, from 168 Mgal/d used in 1987 to a medium projected 338 Mgal/d for 2020. Dade County?s public-supply water use is projected (medium) to increase to nearly 471 Mgal/d for 2020, the largest county use in Florida. Water demand options, such as conservation, restrictions, education programs, leak detection and repair programs, and more realistic pricing practices can reduce the demand for freshwater. Increased use of alternative sources of water, such as reclaimed wastewater and desalinated seawater also can reduce the demand for freshwater. Because the water demand projections in this report are based primarily on population projections, they should represent an upper limit of actual future demand if the population projections prove sound. Any additional water demand options implemented in the future at the State, county, or public-supply facility level may significantly reduce per capita use and result in public-supply use less than projected in this report.

  16. Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fletcher, James H.; Cox, Philip; Harrington, William J

    2013-09-03

    ABSTRACT Project Title: Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing PROJECT OBJECTIVE The objective of the project was to advance portable fuel cell system technology towards the commercial targets of power density, energy density and lifetime. These targets were laid out in the DOE’s R&D roadmap to develop an advanced direct methanol fuel cell power supply that meets commercial entry requirements. Such a power supply will enable mobile computers to operate non-stop, unplugged from the wall power outlet, by using the high energy density of methanol fuel contained in a replaceable fuel cartridge. Specifically this project focusedmore » on balance-of-plant component integration and miniaturization, as well as extensive component, subassembly and integrated system durability and validation testing. This design has resulted in a pre-production power supply design and a prototype that meet the rigorous demands of consumer electronic applications. PROJECT TASKS The proposed work plan was designed to meet the project objectives, which corresponded directly with the objectives outlined in the Funding Opportunity Announcement: To engineer the fuel cell balance-of-plant and packaging to meet the needs of consumer electronic systems, specifically at power levels required for mobile computing. UNF used existing balance-of-plant component technologies developed under its current US Army CERDEC project, as well as a previous DOE project completed by PolyFuel, to further refine them to both miniaturize and integrate their functionality to increase the system power density and energy density. Benefits of UNF’s novel passive water recycling MEA (membrane electrode assembly) and the simplified system architecture it enabled formed the foundation of the design approach. The package design was hardened to address orientation independence, shock, vibration, and environmental requirements. Fuel cartridge and fuel subsystems were improved to ensure effective fuel containment. PROJECT OVERVIEW The University of North Florida (UNF), with project partner the University of Florida, recently completed the Department of Energy (DOE) project entitled “Advanced Direct Methanol Fuel Cell for Mobile Computing”. The primary objective of the project was to advance portable fuel cell system technology towards the commercial targets as laid out in the DOE R&D roadmap by developing a 20-watt, direct methanol fuel cell (DMFC), portable power supply based on the UNF innovative “passive water recovery” MEA. Extensive component, sub-system, and system development and testing was undertaken to meet the rigorous demands of the consumer electronic application. Numerous brassboard (nonpackaged) systems were developed to optimize the integration process and facilitating control algorithm development. The culmination of the development effort was a fully-integrated, DMFC, power supply (referred to as DP4). The project goals were 40 W/kg for specific power, 55 W/l for power density, and 575 Whr/l for energy density. It should be noted that the specific power and power density were for the power section only, and did not include the hybrid battery. The energy density is based on three, 200 ml, fuel cartridges, and also did not include the hybrid battery. The results show that the DP4 system configured without the methanol concentration sensor exceeded all performance goals, achieving 41.5 W/kg for specific power, 55.3 W/l for power density, and 623 Whr/l for energy density. During the project, the DOE revised its technical targets, and the definition of many of these targets, for the portable power application. With this revision, specific power, power density, specific energy (Whr/kg), and energy density are based on the total system, including fuel tank, fuel, and hybridization battery. Fuel capacity is not defined, but the same value is required for all calculations. Test data showed that the DP4 exceeded all 2011 Technical Status values; for example, the DP4 energy density was 373 Whr/l versus the DOE 2011 status of 200 Whr/l. For the DOE 2013 Technical Goals, the operation time was increased from 10 hours to 14.3 hours. Under these conditions, the DP4 closely approached or surpassed the technical targets; for example, the DP4 achieved 468 Whr/l versus the goal of 500 Whr/l. Thus, UNF has successfully met the project goals. A fully-operational, 20-watt DMFC power supply was developed based on the UNF passive water recovery MEA. The power supply meets the project performance goals and advances portable power technology towards the commercialization targets set by the DOE.« less

  17. Southern Forest Resource Assessment Using the Subregional Timber Supply (SRTS) Model

    Treesearch

    Robert C. Abt; Frederick W. Cubbage; Gerardo Pacheco

    2000-01-01

    Most timber supply analyses are focused on broad regions. This paper describes a modeling system that uses a standard empirical framework applied to subregional inventory data in the South. Model results indicate significant within-region variation in supply responses across owners and regions. Projections of southern timber markets indicate that results are sensitive...

  18. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  19. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  20. Dynamics of global supply chain and electric power networks: Models, pricing analysis, and computations

    NASA Astrophysics Data System (ADS)

    Matsypura, Dmytro

    In this dissertation, I develop a new theoretical framework for the modeling, pricing analysis, and computation of solutions to electric power supply chains with power generators, suppliers, transmission service providers, and the inclusion of consumer demands. In particular, I advocate the application of finite-dimensional variational inequality theory, projected dynamical systems theory, game theory, network theory, and other tools that have been recently proposed for the modeling and analysis of supply chain networks (cf. Nagurney (2006)) to electric power markets. This dissertation contributes to the extant literature on the modeling, analysis, and solution of supply chain networks, including global supply chains, in general, and electric power supply chains, in particular, in the following ways. It develops a theoretical framework for modeling, pricing analysis, and computation of electric power flows/transactions in electric power systems using the rationale for supply chain analysis. The models developed include both static and dynamic ones. The dissertation also adds a new dimension to the methodology of the theory of projected dynamical systems by proving that, irrespective of the speeds of adjustment, the equilibrium of the system remains the same. Finally, I include alternative fuel suppliers, along with their behavior into the supply chain modeling and analysis framework. This dissertation has strong practical implications. In an era in which technology and globalization, coupled with increasing risk and uncertainty, complicate electricity demand and supply within and between nations, the successful management of electric power systems and pricing become increasingly pressing topics with relevance not only for economic prosperity but also national security. This dissertation addresses such related topics by providing models, pricing tools, and algorithms for decentralized electric power supply chains. This dissertation is based heavily on the following coauthored papers: Nagurney, Cruz, and Matsypura (2003), Nagurney and Matsypura (2004, 2005, 2006), Matsypura and Nagurney (2005), Matsypura, Nagurney, and Liu (2006).

  1. F-16 Instructional System Design Alternatives.

    DTIC Science & Technology

    1981-03-01

    inservice training 1-15 Subsystem: Supply maintenance Function: FL 4.8 Perform supply maintenance FL...000 0 F-16 AIRCREW TRAINING DEVELOPMENT PROJECT Contract No. F02604-79-C8875 DTIC ELECTE:, .JUNO 8 1981 K2>)F-i6 JSTRUCTIONAL_.YSTEM" P§ __SIGN AL ER TI...8217’’’ ’ " -... . .... . .. ..-- , .. , ... 4:-... <" ’’’’- " - . . . .. -,-: - PREFACE This report was created for the F-16 Aircrew Training De- velopment Project contract

  2. Forecasting the Performance of Agroforestry Systems

    NASA Astrophysics Data System (ADS)

    Luedeling, E.; Shepherd, K.

    2014-12-01

    Agroforestry has received considerable attention from scientists and development practitioners in recent years. It is recognized as a cornerstone of many traditional agricultural systems, as well as a new option for sustainable land management in currently treeless agricultural landscapes. Agroforestry systems are diverse, but most manifestations supply substantial ecosystem services, including marketable tree products, soil fertility, water cycle regulation, wildlife habitat and carbon sequestration. While these benefits have been well documented for many existing systems, projecting the outcomes of introducing new agroforestry systems, or forecasting system performance under changing environmental or climatic conditions, remains a substantial challenge. Due to the various interactions between system components, the multiple benefits produced by trees and crops, and the host of environmental, socioeconomic and cultural factors that shape agroforestry systems, mechanistic models of such systems quickly become very complex. They then require a lot of data for site-specific calibration, which presents a challenge for their use in new environmental and climatic domains, especially in data-scarce environments. For supporting decisions on the scaling up of agroforestry technologies, new projection methods are needed that can capture system complexity to an adequate degree, while taking full account of the fact that data on many system variables will virtually always be highly uncertain. This paper explores what projection methods are needed for supplying decision-makers with useful information on the performance of agroforestry in new places or new climates. Existing methods are discussed in light of these methodological needs. Finally, a participatory approach to performance projection is proposed that captures system dynamics in a holistic manner and makes probabilistic projections about expected system performance. This approach avoids the temptation to take spuriously precise model results at face value, and it is able to make predictions even where data is scarce. It thus provides a rapid and honest assessment option that can quickly supply decision-makers with system performance estimates, offering an opportunity to improve the targeting of agroforestry interventions.

  3. Vulnerability-based evaluation of water supply design under climate change

    NASA Astrophysics Data System (ADS)

    Umit Taner, Mehmet; Ray, Patrick; Brown, Casey

    2015-04-01

    Long-lived water supply infrastructures are strategic investments in the developing world, serving the purpose of balancing water deficits compounded by both population growth and socio-economic development. Robust infrastructure design under climate change is compelling, and often addressed by focusing on the outcomes of climate model projections ('scenario-led' planning), or by identifying design options that are less vulnerable to a wide range of plausible futures ('vulnerability-based' planning). Decision-Scaling framework combines these two approaches by first applying a climate stress test on the system to explore vulnerabilities across many traces of the future, and then employing climate projections to inform the decision-making process. In this work, we develop decision scaling's nascent risk management concepts further, directing actions on vulnerabilities identified during the climate stress test. In the process, we present a new way to inform climate vulnerability space using climate projections, and demonstrate the use of multiple decision criteria to guide to a final design recommendation. The concepts are demonstrated for a water supply project in the Mombasa Province of Kenya, planned to provide domestic and irrigation supply. Six storage design capacities (from 40 to 140 million cubic meters) are explored through a stress test, under a large number climate traces representing both natural climate variability and plausible climate changes. Design outcomes are simulated over a 40-year planning period with a coupled hydrologic-water resources systems model and using standard reservoir operation rules. Resulting performance is expressed in terms of water supply reliability and economic efficiency. Ensemble climate projections are used for assigning conditional likelihoods to the climate traces using a statistical distance measure. The final design recommendations are presented and discussed for the decision criteria of expected regret, satisficing, and conditional value-at-risk (CVaR).

  4. Requirements of supply chain management in differentiating European pork chains.

    PubMed

    Trienekens, Jacques; Wognum, Nel

    2013-11-01

    This paper summarizes results obtained by research into pork chain management in the EU Integrated Project Q-Porkchains. Changing demands for intrinsic and extrinsic quality attributes of pork products impact the way supply chain management should be organized from the farmer down to the consumer. The paper shows the importance of Quality Management Systems for integrating supply chains and enhancing consumer confidence. The paper also presents innovations in information system integration for aligning information exchange in the supply chain and logistics concepts based on innovative measurement technologies at the slaughterhouse stage. In the final section research challenges towards sustainable pork supply chains satisfying current consumer demands are presented. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Public policy issues. A Southern California Gas Company project SAGE report

    NASA Technical Reports Server (NTRS)

    Barbieri, R. H.; Hirsberg, A. S.

    1978-01-01

    The use of solar energy to stretch our supplies of fossil fuels was investigated. Project SAGE (semi-automated ground environment) addresses itself to one application of this goal, solar assistance in central water heating systems for multifamily projects. Public policy issues that affect the rate of adoption of solar energy systems were investigated and policy actions were offered to accelerate the adoption of SAGE and other solar energy systems.

  6. A study of ecological sanitation as an integrated urban water supply system: case study of sustainable strategy for Kuching City, Sarawak, Malaysia.

    PubMed

    Seng, Darrien Mah Yau; Putuhena, Frederik Josep; Said, Salim; Ling, Law Puong

    2009-03-01

    A city consumes a large amount of water. Urban planning and development are becoming more compelling due to the fact of growing competition for water, which has lead to an increasing and conflicting demand. As such, investments in water supply, sanitation and water resources management is a strong potential for a solid return. A pilot project of greywater ecological treatment has been established in Kuching city since 2003. Such a treatment facility opens up an opportunity of wastewater reclamation for reuse as secondary sources of water for non-consumptive purposes. This paper aims to explore the potential of the intended purposes in the newly developed ecological treatment project. By utilizing the Wallingford Software model, InfoWorks WS (Water Supply) is employed to carry out a hydraulic modeling of a hypothetical greywater recycling system as an integrated part of the Kuching urban water supply, where the greywater is treated, recycled and reused in the domestic environment. The modeling efforts have shown water savings of about 40% from the investigated system reinstating that the system presents an alternative water source worth exploring in an urban environment.

  7. Life cycle assessment of water supply alternatives in water-receiving areas of the South-to-North Water Diversion Project in China.

    PubMed

    Li, Yi; Xiong, Wei; Zhang, Wenlong; Wang, Chao; Wang, Peifang

    2016-02-01

    To alleviate the water shortage in northern China, the Chinese government launched the world's largest water diversion project, the South-to-North Water Diversion Project (SNWDP), which delivers water from water-sufficient southern China to water-deficient northern China. However, an up-to-date study has not been conducted to determine whether the project is a favorable option to augment the water supply from an environmental perspective. The life cycle assessment (LCA) methodology integrated with a freshwater withdrawal category (FWI) was adopted to compare water supply alternatives in the water-receiving areas of the SNWDP, i.e., water diversion, wastewater reclamation and seawater desalination. Beijing, Tianjin, Jinan and Qingdao were studied as representative cities because they are the primary water-receiving areas of the SNWDP. The results revealed that the operation phase played the dominant role in all but one of the life cycle impact categories considered and contributed to more than 70% of their scores. For Beijing and Tianjin, receiving water through the SNWDP is the most sustainable option to augment the water supply. The result can be drawn in all of the water-receiving areas of the middle route of the SNWDP. For Jinan and Qingdao, the most sustainable option is the wastewater reclamation system. The seawater desalination system obtains the highest score of the standard impact indicators in all of the study areas, whereas it is the most favorable water supply option when considering the freshwater withdrawal impact. Although the most sustainable water supply alternative was recommended through an LCA analysis, multi-water resources should be integrated into the region's water supply from the perspective of water sustainability. The results of this study provide a useful recommendation on the management of water resources for China. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    NASA Astrophysics Data System (ADS)

    Hanson, R. T.; Lockwood, B.; Schmid, Wolfgang

    2014-11-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within ;water-balance subregions; (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori. The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations and assumptions of 2009 urban water demand and land use. Water supplied directly from precipitation, and indirectly from reuse, captured local runoff, and groundwater is necessary but inadequate to satisfy agricultural demand without coastal and regional storage depletion that facilitates seawater intrusion. These facilities reduce potential seawater intrusion by about 45% with groundwater levels in the four regions served by the CDS projected to recover to levels a few feet above sea level. The projected recoveries are not high enough to prevent additional seawater intrusion during dry-year periods or in the deeper aquifers where pumpage is greater. While these facilities could reduce coastal pumpage by about 55% of the historical 2000-2009 pumpage for these regions, and some of the water is delivered in excess of demand, other coastal regions continue to create demands on coastal pumpage that will need to be replaced to reduce seawater intrusion. In addition, inland urban and agricultural demands continue to sustain water levels below sea level causing regional landward gradients that also drive seawater intrusion. Seawater intrusion is reduced by about 45% but it supplies about 55% of the recovery of groundwater levels in the coastal regions served by the CDS. If economically feasible, water from summer agricultural runoff and tile-drain returnflows could be another potential local source of water that, if captured and reused, could offset the imbalance between supply and demand as well as reducing discharge of agricultural runoff into the National Marine Sanctuary of Monterey Bay. A BMP update (2012) identifies projects and programs that will fund a conservation program and will provide additional, alternative water sources to reduce or replace coastal and inland pumpage, and to replenish the aquifers with managed aquifer recharge in an inland portion of the Pajaro Valley.

  9. The status of power supplies for primary electric propulsion in the U.S.A.

    NASA Technical Reports Server (NTRS)

    Jones, R. M.; Scott-Monck, J. A.

    1984-01-01

    This paper reviews the status of and requirements on solar electric and nuclear electric power supplies for primary electric propulsion missions. The power supply requirements of power level, specific mass (kg/kWe) and lifetime are defined as a function of the mission and electric propulsion system characteristics for planetary missions. The technology status of planar and concentrator arrays is discussed. Nuclear reactors and thermoelectric, thermionic, Brayton and Rankine conversion technologies are reviewed, as well as recent nuclear power system design concepts and program activity. Technology projections for power supplies applicable to primary electric propulsion missions are included.

  10. Triangle area water supply monitoring project, October 1988 through September 2001, North Carolina -- description of the water-quality network, sampling and analysis methods, and quality-assurance practices

    USGS Publications Warehouse

    Oblinger, Carolyn J.

    2004-01-01

    The Triangle Area Water Supply Monitoring Project was initiated in October 1988 to provide long-term water-quality data for six area water-supply reservoirs and their tributaries. In addition, the project provides data that can be used to determine the effectiveness of large-scale changes in water-resource management practices, document differences in water quality among water-supply types (large multiuse reservoir, small reservoir, run-of-river), and tributary-loading and in-lake data for water-quality modeling of Falls and Jordan Lakes. By September 2001, the project had progressed in four phases and included as many as 34 sites (in 1991). Most sites were sampled and analyzed by the U.S. Geological Survey. Some sites were already a part of the North Carolina Division of Water Quality statewide ambient water-quality monitoring network and were sampled by the Division of Water Quality. The network has provided data on streamflow, physical properties, and concentrations of nutrients, major ions, metals, trace elements, chlorophyll, total organic carbon, suspended sediment, and selected synthetic organic compounds. Project quality-assurance activities include written procedures for sample collection, record management and archive, collection of field quality-control samples (blank samples and replicate samples), and monitoring the quality of field supplies. In addition to project quality-assurance activities, the quality of laboratory analyses was assessed through laboratory quality-assurance practices and an independent laboratory quality-control assessment provided by the U.S. Geological Survey Branch of Quality Systems through the Blind Inorganic Sample Project and the Organic Blind Sample Project.

  11. Solar hot water demonstration project at Red Star Industrial Laundry, Fresno, California

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The performance of a Solar Hot Water System at a laundry in Fresno, California is described. The system features an integrated wastewater heat recovery subsystem and a solar preheating system designed to supply a part of the hot water requirements. Performance data for a six month period are projected to an annual savings of $18,703.

  12. Small business innovation research. Abstracts of completed 1987 phase 1 projects

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Non-proprietary summaries of Phase 1 Small Business Innovation Research (SBIR) projects supported by NASA in the 1987 program year are given. Work in the areas of aeronautical propulsion, aerodynamics, acoustics, aircraft systems, materials and structures, teleoperators and robotics, computer sciences, information systems, spacecraft systems, spacecraft power supplies, spacecraft propulsion, bioastronautics, satellite communication, and space processing are covered.

  13. A probabilistic framework for assessing vulnerability to climate variability and change: The case of the US water supply system

    Treesearch

    Romano Foti; Jorge A. Ramirez; Thomas C. Brown

    2014-01-01

    We introduce a probabilistic framework for vulnerability analysis and use it to quantify current and future vulnerability of the US water supply system. We also determine the contributions of hydro-climatic and socio-economic drivers to the changes in projected vulnerability. For all scenarios and global climatemodels examined, the US Southwest including California and...

  14. Urban Wood-Based Bio-Energy Systems in Seattle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stan Gent, Seattle Steam Company

    2010-10-25

    Seattle Steam Company provides thermal energy service (steam) to the majority of buildings and facilities in downtown Seattle, including major hospitals (Swedish and Virginia Mason) and The Northwest (Level I) Regional Trauma Center. Seattle Steam has been heating downtown businesses for 117 years, with an average length of service to its customers of 40 years. In 2008 and 2009 Seattle Steam developed a biomass-fueled renewable energy (bio-energy) system to replace one of its gas-fired boilers that will reduce greenhouse gases, pollutants and the amount of waste sent to landfills. This work in this sub-project included several distinct tasks associated withmore » the biomass project development as follows: a. Engineering and Architecture: Engineering focused on development of system control strategies, development of manuals for start up and commissioning. b. Training: The project developer will train its current operating staff to operate equipment and facilities. c. Flue Gas Clean-Up Equipment Concept Design: The concept development of acid gas emissions control system strategies associated with the supply wood to the project. d. Fuel Supply Management Plan: Development of plans and specifications for the supply of wood. It will include potential fuel sampling analysis and development of contracts for delivery and management of fuel suppliers and handlers. e. Integrated Fuel Management System Development: Seattle Steam requires a biomass Fuel Management System to track and manage the delivery, testing, processing and invoicing of delivered fuel. This application will be web-based and accessed from a password-protected URL, restricting data access and privileges by user-level.« less

  15. 18 CFR 806.25 - Water conservation standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... sources, or both, shall comply with the following requirements: (a) Public water supply. As circumstances warrant, a project sponsor of a public water supply shall: (1) Reduce distribution system losses to a... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Water conservation...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sun, Amy Cha-Tien; Downes, Paula Sue; Heinen, Russell

    Analysis of chemical supply chains is an inherently complex task, given the dependence of these supply chains on multiple infrastructure systems (e.g., the petroleum sector, transportation, etc.). This effort requires data and information at various levels of resolution, ranging from network-level distribution systems to individual chemical reactions. Sandia National Laboratories (Sandia) has integrated its existing simulation and infrastructure analysis capabilities with chemical data models to analyze the chemical supply chains of several nationally critical chemical commodities. This paper describes how Sandia models the ethylene supply chain; that is, the supply chain for the most widely used raw material for plasticsmore » production including a description of the types of data and modeling capabilities that are required to represent the ethylene supply chain. The paper concludes with a description of Sandia's use the model to project how the supply chain would be affected by and adapt to a disruptive scenario hurricane.« less

  17. Research on the water hammer protection of the long distance water supply project with the combined action of the air vessel and over-pressure relief valve

    NASA Astrophysics Data System (ADS)

    Li, D. D.; Jiang, J.; Zhao, Z.; Yi, W. S.; Lan, G.

    2013-12-01

    We take a concrete pumping station as an example in this paper. Through the calculation of water hammer protection with a specific pumping station water supply project, and the analysis of the principle, mathematical models and boundary conditions of air vessel and over-pressure relief valve we show that the air vessel can protect the water conveyance system and reduce the transient pressure damage due to various causes. Over-pressure relief valve can effectively reduce the water hammer because the water column re-bridge suddenly stops the pump and prevents pipeline burst. The paper indicates that the combination set of air vessel and over-pressure relief valve can greatly reduce the quantity of the air valve and can eliminate the water hammer phenomenon in the pipeline system due to the vaporization and water column separation and re-bridge. The conclusion could provide a reference for the water hammer protection of long-distance water supply system.

  18. An Integrated Hydrologic-Economic Modeling Tool for Evaluating Water Management Responses to Climate Change in the Boise River Basin

    NASA Astrophysics Data System (ADS)

    Schmidt, R. D.; Taylor, R. G.; Stodick, L. D.; Contor, B. A.

    2009-12-01

    A recent federal interagency report on climate change and water management (Brekke et. al., 2009) describes several possible management responses to the impacts of climate change on water supply and demand. Management alternatives include changes to water supply infrastructure, reservoir system operations, and water demand policies. Water users in the Bureau of Reclamation’s Boise Project (located in the Lower Boise River basin in southwestern Idaho) would be among those impacted both hydrologically and economically by climate change. Climate change and management responses to climate change are expected to cause shifts in water supply and demand. Supply shifts would result from changes in basin precipitation patterns, and demand shifts would result from higher evapotranspiration rates and a longer growing season. The impacts would also extend to non-Project water users in the basin, since most non-Project groundwater pumpers and drain water diverters rely on hydrologic externalities created by seepage losses from Boise Project water deliveries. An integrated hydrologic-economic model was developed for the Boise basin to aid Reclamation in evaluating the hydrologic and economic impacts of various management responses to climate change. A spatial, partial-equilibrium, economic optimization model calculates spatially-distinct equilibrium water prices and quantities, and maximizes a social welfare function (the sum of consumer and producers surpluses) for all agricultural and municipal water suppliers and demanders (both Project and non-Project) in the basin. Supply-price functions and demand-price functions are exogenous inputs to the economic optimization model. On the supply side, groundwater and river/reservoir models are used to generate hydrologic responses to various management alternatives. The response data is then used to develop water supply-price functions for Project and non-Project water users. On the demand side, crop production functions incorporating crop distribution, evapotranspiration rates, irrigation efficiencies, and crop prices are used to develop water demand-price functions for agricultural water users. Demand functions for municipal and industrial water users are also developed. Recent applications of the integrated model have focused on the hydrologic and economic impacts of demand management alternatives, including large-scale canal lining conservation measures, and market-based water trading between canal diverters and groundwater pumpers. A supply management alternative being investigated involves revising reservoir rule curves to compensate for climate change impacts on timing of reservoir filling.

  19. Many-objective optimization and visual analytics reveal key trade-offs for London's water supply

    NASA Astrophysics Data System (ADS)

    Matrosov, Evgenii S.; Huskova, Ivana; Kasprzyk, Joseph R.; Harou, Julien J.; Lambert, Chris; Reed, Patrick M.

    2015-12-01

    In this study, we link a water resource management simulator to multi-objective search to reveal the key trade-offs inherent in planning a real-world water resource system. We consider new supplies and demand management (conservation) options while seeking to elucidate the trade-offs between the best portfolios of schemes to satisfy projected water demands. Alternative system designs are evaluated using performance measures that minimize capital and operating costs and energy use while maximizing resilience, engineering and environmental metrics, subject to supply reliability constraints. Our analysis shows many-objective evolutionary optimization coupled with state-of-the art visual analytics can help planners discover more diverse water supply system designs and better understand their inherent trade-offs. The approach is used to explore future water supply options for the Thames water resource system (including London's water supply). New supply options include a new reservoir, water transfers, artificial recharge, wastewater reuse and brackish groundwater desalination. Demand management options include leakage reduction, compulsory metering and seasonal tariffs. The Thames system's Pareto approximate portfolios cluster into distinct groups of water supply options; for example implementing a pipe refurbishment program leads to higher capital costs but greater reliability. This study highlights that traditional least-cost reliability constrained design of water supply systems masks asset combinations whose benefits only become apparent when more planning objectives are considered.

  20. World energy projection system: Model documentation

    NASA Astrophysics Data System (ADS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  1. 78 FR 50405 - Amended Application for Presidential Permit; Northern Pass Transmission LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... project would adversely affect the operation of the U.S. electric power supply system under normal and... proposed project. Northern Pass is wholly owned by NU Transmission Ventures, Inc., a wholly-owned..., that would meet the needs of the Project.'' On July 1, 2013, Northern Pass submitted an amended...

  2. The aggregate timberland assessment system—ATLAS: a comprehensive timber projection model.

    Treesearch

    J.R. Mills; J.C. Kincaid

    1992-01-01

    The aggregate timberland assessment system is a time-based deterministic timber projection model. It was developed by the USDA Forest Service to address broad policy questions related to future timber supplies for the 1989 Renewable Resources Planning Act timber assessment. An open framework design allows for customizing inputs to account for regional and subregional...

  3. Hypermedia Tutoring System: Towards an Architecture Dedicated to the WEB Specification.

    ERIC Educational Resources Information Center

    Beltran, T.; Peninou, A.

    The first stage of the HyTuS (Hypermedia Tutoring System) project, developed by the Alliance Francaise (a training institute supplying French courses for foreigners in France and abroad), and professional partners, is presented. The aim of the project is to provide a hypermedia CD-ROM-based environment for learning French according to the Alliance…

  4. The Development of an Occupational Information System (OIS), Volume II.

    ERIC Educational Resources Information Center

    Louisiana State Univ., Baton Rouge. Div. of Continuing Education.

    Suppliers of postsecondary trained manpower data in Louisiana were surveyed during a project to obtain labor market information and occupational supply/demand information. All supply data were computerized and assigned to the appropriate training file. The data compiled fell into four major categories with regard to the method(s) of capture and…

  5. SCRL-Model for Human Space Flight Operations Enterprise Supply Chain

    NASA Technical Reports Server (NTRS)

    Tucker, Brian; Paxton, Joseph

    2010-01-01

    This paper will present a Supply Chain Readiness Level (SCRL) model that can be used to evaluate and configure adaptable and sustainable program and mission supply chains at an enterprise level. It will also show that using SCRL in conjunction with Technology Readiness Levels (TRLs), Manufacturing Readiness Levels (MRLs) and National Aeronautics Space Administrations (NASA s) Project Lifecycle Process will provide a more complete means of developing and evaluating a robust sustainable supply chain that encompasses the entire product, system and mission lifecycle. In addition, it will be shown that by implementing the SCRL model, NASA can additionally define supplier requirements to enable effective supply chain management (SCM). Developing and evaluating overall supply chain readiness for any product, system and mission lifecycle is critical for mission success. Readiness levels are presently being used to evaluate the maturity of technology and manufacturing capability during development and deployment phases of products and systems. For example, TRLs are used to support the assessment of the maturity of a particular technology and compare maturity of different types of technologies. MRLs are designed to assess the maturity and risk of a given technology from a manufacturing perspective. In addition, when these measurement systems are used collectively they can offer a more comprehensive view of the maturity of the system. While some aspects of the supply chain and supply chain planning are considered in these familiar metric systems, certain characteristics of an effective supply chain, when evaluated in more detail, will provide an improved insight into the readiness and risk throughout the supply chain. Therefore, a system that concentrates particularly on supply chain attributes is required to better assess enterprise supply chain readiness.

  6. SMALL SCALE ECOSYSTEM ENGINEERING: DEVELOPMENT OF HOUSEHOLD LEVEL GREYWATER TREATMENT SYSTEMS

    EPA Science Inventory

    The project will increase quality of life through the protection of ecosystem services and drinking water supplies through pollution reduction. Additionally, through water reuse our project has the potential to decrease overall water consumption. Decreasing overall water co...

  7. Sectoral contributions to surface water stress in the coterminous United States

    NASA Astrophysics Data System (ADS)

    Averyt, K.; Meldrum, J.; Caldwell, P.; Sun, G.; McNulty, S.; Huber-Lee, A.; Madden, N.

    2013-09-01

    Here, we assess current stress in the freshwater system based on the best available data in order to understand possible risks and vulnerabilities to regional water resources and the sectors dependent on freshwater. We present watershed-scale measures of surface water supply stress for the coterminous United States (US) using the water supply stress index (WaSSI) model which considers regional trends in both water supply and demand. A snapshot of contemporary annual water demand is compared against different water supply regimes, including current average supplies, current extreme-year supplies, and projected future average surface water flows under a changing climate. In addition, we investigate the contributions of different water demand sectors to current water stress. On average, water supplies are stressed, meaning that demands for water outstrip natural supplies in over 9% of the 2103 watersheds examined. These watersheds rely on reservoir storage, conveyance systems, and groundwater to meet current water demands. Overall, agriculture is the major demand-side driver of water stress in the US, whereas municipal stress is isolated to southern California. Water stress introduced by cooling water demands for power plants is punctuated across the US, indicating that a single power plant has the potential to stress water supplies at the watershed scale. On the supply side, watersheds in the western US are particularly sensitive to low flow events and projected long-term shifts in flow driven by climate change. The WaSSI results imply that not only are water resources in the southwest in particular at risk, but that there are also potential vulnerabilities to specific sectors, even in the ‘water-rich’ southeast.

  8. 43 CFR 404.9 - What types of infrastructure and facilities may be included in an eligible rural water supply...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... facilities may be included in an eligible rural water supply project? 404.9 Section 404.9 Public Lands... RURAL WATER SUPPLY PROGRAM Overview § 404.9 What types of infrastructure and facilities may be included in an eligible rural water supply project? A rural water supply project may include, but is not...

  9. Coupling Effect between Equilibrium Field and Heating Field and Modification of the Power Supply System on SUNIST Spherical Tokamak

    NASA Astrophysics Data System (ADS)

    He, Yexi; Li, Xiaoyan; Gao, Zhe

    2005-02-01

    Strong inductive coupling between the heating field and equilibrium field is confirmed to be responsible for the poor plasma equilibrium in initial discharges on the SUNIST spherical tokamak. A modification project for the power supply system of equilibrium field coils is successfully performed to increase the duration time of plasma current flattop from much less than 1ms to about 2 ms.

  10. Causes of shortage and delay in material supply: a preliminary study

    NASA Astrophysics Data System (ADS)

    Rahman, M. M.; Yap, Y. H.; Ramli, N. R.; Dullah, M. A.; Shamsuddin, M. S. W.

    2017-11-01

    Shortage and delay in materials supply is argued to be one of the most important factors that lead to delay in construction project delivery globally. However, the relevant underlying reasons vary from country to country. As such, this paper summarises the outcomes of a study that targeted identifying causes of shortage and delay in materials supply in Brunei Darussalam. The study was conducted through fifteen semi-structured interviews of contractors and materials suppliers in Brunei. The study identified six causes of shortageof materials and nine causes of delay in materials supply in Brunei. The most importantcausefor shortage of materials relates to the origin or availability of construction materials. On the other hand, the most influential cause of delay in material supply was found to be poor materials procurement and inventory management system, which has other underlying reasons such as late identification of the type of materials needed. The observations are expected to help in formulating or reviewing relevant policies, in order to ensure on-time project delivery.

  11. Micron2 Lab: Microfluidic Microbiology Lab Project

    NASA Technical Reports Server (NTRS)

    Burton, Aaron; Botkin, Douglas; Castro, Sarah; Crucian, Brian

    2015-01-01

    Microbial monitoring during spaceflight is crucial to maintain crew health and ensure water purifications systems are functioning properly. Current protocols for in-flight enumeration of bacteria in potable water systems require culture based methods. In this project, we aim to develop a flight- and microgravity-compatible flow cytometer capable of counting total microbial counts in the water supply and differentiating live from dead bacteria.

  12. Efficient management of municipal water: water scarcity in Taiz City, Yemen - issues and options

    NASA Astrophysics Data System (ADS)

    Noaman, A.; Al-Sharjabe, A. W.

    2015-04-01

    The city of Taiz is the third largest city in Yemen, located about 250 km south of Sana'a and about 90 km inland from the Red Sea. Taiz is situated on the foothills and slopes of the Jabal Saber Mountain at elevations between 1100 and 1600 m a.s.l. Its population is rapidly increasing and is expected to grow from about 580 000 in 2012 to over 1 000 000 in 2020. Water supply is the most pressing problem in the city of Taiz today due to the significant shortages of supply (the average consumption is 23 L/d) caused by the depletion of existing water resources and the lack of a clear direction in dealing with the problem. This forces frequent service interruptions (30-40 days) and the service is rarely extended to new users (only 57% of the population are covered). Sanitation is another daunting problem. The (poorly maintained) sewerage network covers only 44% of the population. In several unsewered areas to the north, east and west of the city, raw sewage is disposed of directly into wadis, which causes a health hazard and threatens to contaminate groundwater resources. The proper computation of demand and supply is based on the various fields. It was performed under this study with a particular model: the Water Evaluation and Planning System (WEAP) developed by the Stockholm Environment Institute (SEI). WEAP is supported by a geographical information system (GIS). The available and relevant data on poverty and social indicators, water use and sources, surface runoff, surface and groundwater availability, groundwater depletion and management, crop production areas, soil cover, maps, and meteorological information were gathered from a number of sources. There are only two ways to decrease the water deficit: by increasing water supply or decreasing the water demand. Any adaptation project aims at one of the two. Six projects are proposed, with three in each category (1, 2 and 3 to decrease demand, and 4, 5 and 6 to increase supply): - Project 1: Improvement of irrigation methods - Project 2: Improvement of the water distribution network in Taiz City - Project 3: Water re-use - Project 4: Water harvesting - Project 5: Brackish water treatment - Project 6: Desalinization of sea water

  13. Supply chain optimization at an academic medical center.

    PubMed

    Labuhn, Jonathan; Almeter, Philip; McLaughlin, Christopher; Fields, Philip; Turner, Benjamin

    2017-08-01

    A successful supply chain optimization project that leveraged technology, engineering principles, and a technician workflow redesign in the setting of a growing health system is described. With continued rises in medication costs, medication inventory management is increasingly important. Proper management of central pharmacy inventory and floor-stock inventory in automated dispensing cabinets (ADCs) can be challenging. In an effort to improve control of inventory costs in the central pharmacy of a large academic medical center, the pharmacy department implemented a supply chain optimization project in collaboration with the medical center's inhouse team of experts on process improvement and industrial engineering. The project had 2 main components: (1) upgrading and reconfiguring carousel technology within an expanded central pharmacy footprint to generate accurate floor-stock inventory replenishment reports, which resulted in efficiencies within the medication-use system, and (2) implementing a technician workflow redesign and algorithm to right-size the ADC inventory, which decreased inventory stockouts (i.e., incidents of depletion of medication stock) and improved ADC user satisfaction. Through a multifaceted approach to inventory management, the number of stockouts per month was decreased and ADC inventory was optimized, resulting in a one-time inventory cost savings of $220,500. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  14. 40 CFR 35.6340 - Disposal of CERCLA-funded property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... has stopped supporting the project. (b) Supplies. (1) If supplies have an aggregate fair market value.... (2) If the supplies remaining at the end of the project period have an aggregate fair market value of... actions at the direction of EPA: (i) Use the supplies on another CERCLA project and reimburse the original...

  15. Overview of the INPRO Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupitz, J.; Depisch, F.; Zou, Y.

    2004-10-03

    During the last fifty years remarkable results are achieved in the application of nuclear technology for the production of electricity. Looking ahead to the next fifty years it is clear that the demand for energy will grow considerably and also the requirements for the way the energy will be supplied. Within the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO), the future of the energy demand and supply was explored and several scenario's identified. A leading requirement for energy supply is coming up and will play a crucial role: sustainability of the way the energy supply will bemore » realized. Fulfilling the growing need for energy in developing countries is as well an important issue. Based on these scenario's for the next fifty years, an inventory of requirements for the future of nuclear energy systems has been collected as well a methodology developed by INPRO to assess innovative nuclear systems and fuel cycles. On the base of this assessment, the need for innovations and breakthroughs in existing technology can be defined. To facilitate the deployment of innovative nuclear systems also the infrastructure, technical as well as institutional has to be adjusted to the anticipated changes in the world such as the globalization. As a contribution to the conference the main messages of INPRO will be presented.« less

  16. The Coalition for Sustainable Egg Supply project: An introduction.

    PubMed

    Swanson, J C; Mench, J A; Karcher, D

    2015-03-01

    In the United States, empirical information on the sustainability of commercial-scale egg production is lacking. The passage of state regulations specific to hen housing created urgency to better understand the effects of different housing systems on the sustainability of the egg supply, and stimulated the formation of a coalition, the Coalition for a Sustainable Egg Supply (CSES), to conduct research on this topic. The CSES is a multi-stakeholder group with 27 members, including food manufacturers, research institutions, scientists, restaurants, food service, retail food companies, egg suppliers, and nongovernmental organizations. A commercial-scale study was developed to better understand the effect of 3 housing systems (conventional cage, enriched colony, and cage-free aviary) on 5 areas related to a sustainable egg supply. These 5 sustainability areas represent effects on people, animals, and the environment: animal health and well-being, environment, food safety, worker health and safety, and food affordability. Five teams of scientists, each associated with a sustainability area, conducted an integrated field study at a commercial site in the upper Midwest through 2 flock cycles in 3 housing systems. This paper provides a brief overview of the CSES project to serve as an introduction for the papers that follow in this volume of Poultry Science. © The Author 2015. Published by Oxford University Press on behalf of Poultry Science Association.

  17. Residential solar-heating system-design package

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Design package for modular solar heating system includes performance specifications, design data, installation guidelines, and other information that should be valuable to those interested in system (or similar systems) for projected installation. When installed in insulated "energy saver" home, system can supply large percentage of total energy needs of building.

  18. Economic Evaluation of Townhouse Solar Energy System

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Solar-energy site in Columbia, South Carolina, is comprised of four townhouse apartments. Report summarizes economic evaluation of solar--energy system and projected performance of similar systems in four other selected cities. System is designed to supply 65 percent of heating and 75 percent of hot water.

  19. Returning vacationers face heavy reading loads. [Reports, surveys and projections on the national energy supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, T.F.

    1991-10-01

    This article reviews the various reports, surveys and projections on the national energy supply of the summer of 1991. Discussed are the natural gas supplies, competitive electric power production, reliability of independent power, public attitudes toward natural gas, the market share of natural gas, and projection of US energy supply and demand.

  20. 76 FR 37108 - Inside Passage Electric Cooperative; Notice of Declaration of Intention and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Supply Creek Hydroelectric Project. f. Location: The proposed Water Supply Creek Hydroelectric Project will be located on Water Supply Creek, near the town of Hoonah on Chichagof Island, Alaska, affecting T... proposed run-of-river Water Supply Creek Hydroelectric Project will consist of: (1) A proposed 8-foot- high...

  1. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  2. 18 CFR 16.11 - Nonpower licenses.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Nonpower licenses. 16.11 Section 16.11 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... converting the project to nonpower use may have on the power supply of the system served by the project...

  3. Applying Water-Level Difference Control to Central Arizona Project

    USDA-ARS?s Scientific Manuscript database

    The Central Arizona Project (CAP) has been supplying Colorado River water to Central Arizona for roughly 25 years. The CAP canal is operated remotely with a Supervisory Control and Data Acquisition (SCADA) System. Gate position changes are made either manually or through the use of automatic control...

  4. Vulnerability Assessment of Water Supply Systems: Status, Gaps and Opportunities

    NASA Astrophysics Data System (ADS)

    Wheater, H. S.

    2015-12-01

    Conventional frameworks for assessing the impacts of climate change on water resource systems use cascades of climate and hydrological models to provide 'top-down' projections of future water availability, but these are subject to high uncertainty and are model and scenario-specific. Hence there has been recent interest in 'bottom-up' frameworks, which aim to evaluate system vulnerability to change in the context of possible future climate and/or hydrological conditions. Such vulnerability assessments are generic, and can be combined with updated information from top-down assessments as they become available. While some vulnerability methods use hydrological models to estimate water availability, fully bottom-up schemes have recently been proposed that directly map system vulnerability as a function of feasible changes in water supply characteristics. These use stochastic algorithms, based on reconstruction or reshuffling methods, by which multiple water supply realizations can be generated under feasible ranges of change in water supply conditions. The paper reports recent successes, and points to areas of future improvement. Advances in stochastic modeling and optimization can address some technical limitations in flow reconstruction, while various data mining and system identification techniques can provide possibilities to better condition realizations for consistency with top-down scenarios. Finally, we show that probabilistic and Bayesian frameworks together can provide a potential basis to combine information obtained from fully bottom-up analyses with projections available from climate and/or hydrological models in a fully integrated risk assessment framework for deep uncertainty.

  5. Using lean methodology to decrease wasted RN time in seeking supplies in emergency departments.

    PubMed

    Richardson, David M; Rupp, Valerie A; Long, Kayla R; Urquhart, Megan C; Ricart, Erin; Newcomb, Lindsay R; Myers, Paul J; Kane, Bryan G

    2014-11-01

    Timely stocking of essential supplies in an emergency department (ED) is crucial to efficient and effective patient care. The objective of this study was to decrease wasted nursing time in obtaining needed supplies in an ED through the use of Lean process controls. As part of a Lean project, the team conducted a "before and after" prospective observation study of ED nurses seeking supplies. Nurses were observed for an entire shift for the time spent outside the patient room obtaining supplies at baseline and after implementation of a point-of-use storage system. Before implementation, nurses were leaving patient rooms a median of 11 times per 8-hour shift (interquartile range [IQR], 8 times per 8-hour shift) and 10 times per 12-hour shift (IQR, 23 times per 12-hour shift). After implementation of the new system, the numbers decreased to 2.5 per 8-hour shift (IQR, 2 per 8-hour shift) and 1 per 12-hour shift (IQR, 1 per 12-hour shift). A redesigned process including a standardized stocking system significantly decreases the number of searches by nurses for supplies.

  6. Design development and testing of high voltage power supply with crowbar protection for IOT based RF amplifier system in VECC

    NASA Astrophysics Data System (ADS)

    Thakur, S. K.; Kumar, Y.

    2018-05-01

    This paper described the detailed design, development and testing of high voltage power supply (‑30 kV, 3.2 A) and different power supplies for biasing electrodes of Inductive Output Tube (IOT) based high power Radio Frequency (RF) amplifier. This IOT based RF amplifier is further used for pursuing research and development activity in superconducting RF cavity project at Variable Energy Cyclotron Centre (VECC) Kolkata. The state-of-the-art technology of IOT-based high power RF amplifier is designed, developed, and tested at VECC which is the first of its kind in India. A high voltage power supply rated at negative polarity of 30 kV dc/3.2 A is required for biasing cathode of IOT with crowbar protection circuit. This power supply along with crowbar protection system is designed, developed and tested at VECC for testing the complete setup. The technical difficulties and challenges occured during the design of cathode power supply, its crowbar protection techniques along with other supported power supplies i.e. grid and ion pump power supplies are discussed in this paper.

  7. A Case Study: Climate Change Decision Support for the Apalachicola, Chattahoochee, Flint Basins

    NASA Astrophysics Data System (ADS)

    Day, G. N.; McMahon, G.; Friesen, N.; Carney, S.

    2011-12-01

    Riverside Technology, inc. has developed a Climate Change Decision Support System (DSS) to provide water managers with a tool to explore a range of current Global Climate Model (GCM) projections to evaluate their potential impacts on streamflow and the reliability of future water supplies. The system was developed as part of a National Oceanic and Atmospheric Administration (NOAA) Small Business Innovation Research (SBIR) project. The DSS uses downscaled GCM data as input to small-scale watershed models to produce time series of projected undepleted streamflow for various emission scenarios and GCM simulations. Until recently, water managers relied on historical streamflow data for water resources planning. In many parts of the country, great effort has been put into estimating long-term historical undepleted streamflow accounting for regulation, diversions, and return flows to support planning and water rights administration. In some cases, longer flow records have been constructed using paleohydrologic data in an attempt to capture climate variability beyond what is evident during the observed historical record. Now, many water managers are recognizing that historical data may not be representative of an uncertain climate future, and they have begun to explore the use of climate projections in their water resources planning. The Climate Change DSS was developed to support water managers in planning by accounting for both climate variability and potential climate change. In order to use the information for impact analysis, the projected streamflow time series can be exported and substituted for the historical streamflow data traditionally applied in their system operations models for water supply planning. This paper presents a case study in which climate-adjusted flows are coupled with the U.S. Army Corps of Engineers (USACE) ResSim model for the Apalachicola, Chattahoochee, and Flint (ACF) River basins. The study demonstrates how climate scenarios can be used with existing or proposed operating rules to explore the range of potential climate impacts on lake levels, drought trigger frequency, hydropower generation, and low-flow statistics. Initial system implementation of the Climate Change DSS was focused in the State of Colorado working with water supply agencies in the Front Range to assess local water supply vulnerability to climate change. To facilitate national implementation, the system capitalizes on National Weather Service (NWS) watershed models currently used for operational river forecasting. These models are well calibrated and available for the entire country. The system has been extended to include the ACF and the Sacramento River basins because of the importance of the water resources in these basins. Plans are now being made to expand coverage to include the Baltimore-Washington, D.C. water supply area. The DSS is operational and publicly available (www.climatechangedss.com).

  8. Energy-Saving Optimization of Water Supply Pumping Station Life Cycle Based on BIM Technology

    NASA Astrophysics Data System (ADS)

    Qun, Miao; Wang, Jiayuan; Liu, Chao

    2017-12-01

    In the urban water supply system, pump station is the main unit of energy consumption. In the background of pushing forward the informatization in China, using BIM technology in design, construction and operations of water supply pumping station, can break through the limitations of the traditional model and effectively achieve the goal of energy conservation and emissions reduction. This work researches the way to solve energy-saving optimization problems in the process of whole life cycle of water supply pumping station based on BIM technology, and put forward the feasible strategies of BIM application in order to realize the healthy and sustainable development goals by establishing the BIM model of water supply pumping station of Qingdao Guzhenkou water supply project.

  9. Drought and Water Supply. Implications of the Massachusetts Experience for Municipal Planning.

    ERIC Educational Resources Information Center

    Russell, Clifford S.; And Others

    This book uses the 1962-66 Massachusetts drought data as a base of information to build a planning model of water resources that is of interest to students and professionals involved with water management. Using a demand-supply ratio to measure the relative inadequacy of a given water system, the authors then project demand into the drought period…

  10. An Integrated Rare Earth Elements Supply Chain Strategy

    DTIC Science & Technology

    2011-02-24

    iron boron magnets in Joint Direct Attack Munitions (JDAM) smart bombs; neodymium-yttrium- aluminum - garnet lasers and range finders in multiple weapon...components Europium 63 computer screens, fluorescent lights Gadolinium 64 magnetic applications, phosphors Terbium 65 phosphors, projection TV’s...Defense Stockpile report advised several production delays of weapons systems were caused by lanthanum, cerium, europium and gadolinium supply

  11. Embedding an evolving agricultural system within a water resources planning model

    NASA Astrophysics Data System (ADS)

    Young, C.; Joyce, B.; Purkey, D.; Dale, L.; Mehta, V.

    2008-12-01

    The Water Evaluation and Planning (WEAP) system is a comprehensive, fully integrated water basin analysis tool. It is a simulation model that includes a robust and flexible representation of water demands from all sectors and flexible, programmable operating rules for infrastructure elements such as reservoirs, canals, and hydropower projects. Additionally, it has watershed rainfall-runoff modeling capabilities that allow all portions of the water infrastructure and demand to be dynamically nested within the underlying hydrological processes. WEAP also allows for linking with other models to provide feedback mechanisms whereby the management regime can be altered to respond to changing water supply conditions. This study presents an application wherein the year-to-year cropping decisions of farmers in California's Central Valley are reactive to changes in water supply conditions. To capture this dynamic, we have included in WEAP a link to an agricultural economics model (the Central Valley Production Model) that relates cropping decisions to water supply conditions (surface water allocations and depth to groundwater) and economic considerations (cost of electricity) at the time of planting. This linked model was used to evaluate changes in water supply and demand in the context of projected climate change over the next century.

  12. The Earth System (ES-DOC) Project

    NASA Astrophysics Data System (ADS)

    Greenslade, Mark; Murphy, Sylvia; Treshansky, Allyn; DeLuca, Cecilia; Guilyardi, Eric; Denvil, Sebastien

    2014-05-01

    ESSI1.3 New Paradigms, Modelling, and International Collaboration Strategies for Earth System Sciences Earth System Documentation (ES-DOC) is an international project supplying tools & services in support of earth system documentation creation, analysis and dissemination. It is nurturing a sustainable standards based documentation eco-system that aims to become an integral part of the next generation of exa-scale dataset archives. ES-DOC leverages open source software and places end-user narratives at the heart of all it does. ES-DOC has initially focused upon nurturing the Earth System Model (ESM) documentation eco-system. Within this context ES-DOC leverages emerging documentation standards and supports the following projects: Coupled Model Inter-comparison Project Phase 5 (CMIP5); Dynamical Core Model Inter-comparison Project (DCMIP); National Climate Predictions and Projections Platforms Quantitative Evaluation of Downscaling Workshop. This presentation will introduce the project to a wider audience and demonstrate the range of tools and services currently available for use. It will also demonstrate how international collaborative efforts are essential to the success of ES-DOC.

  13. 43 CFR 404.56 - If a financial assistance agreement is entered into for a rural water supply project that...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... entered into for a rural water supply project that benefits more than one Indian tribe, is the approval of... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.56 If a financial assistance agreement is entered into for a rural water supply project that...

  14. Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed pre-processing supply system designs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David J. Muth, Jr.; Matthew H. Langholtz; Eric C. D. Tan

    The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advancesmore » in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to the conversion facility.« less

  15. Investigation of thermochemical biorefinery sizing and environmental sustainability impacts for conventional supply system and distributed preprocessing supply system designs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muth, jr., David J.; Langholtz, Matthew H.; Tan, Eric

    2014-03-31

    The 2011 US Billion-Ton Update estimates that by 2030 there will be enough agricultural and forest resources to sustainably provide at least one billion dry tons of biomass annually, enough to displace approximately 30% of the country's current petroleum consumption. A portion of these resources are inaccessible at current cost targets with conventional feedstock supply systems because of their remoteness or low yields. Reliable analyses and projections of US biofuels production depend on assumptions about the supply system and biorefinery capacity, which, in turn, depend upon economic value, feedstock logistics, and sustainability. A cross-functional team has examined combinations of advancesmore » in feedstock supply systems and biorefinery capacities with rigorous design information, improved crop yield and agronomic practices, and improved estimates of sustainable biomass availability. A previous report on biochemical refinery capacity noted that under advanced feedstock logistic supply systems that include depots and pre-processing operations there are cost advantages that support larger biorefineries up to 10 000 DMT/day facilities compared to the smaller 2000 DMT/day facilities. This report focuses on analyzing conventional versus advanced depot biomass supply systems for a thermochemical conversion and refinery sizing based on woody biomass. The results of this analysis demonstrate that the economies of scale enabled by advanced logistics offsets much of the added logistics costs from additional depot processing and transportation, resulting in a small overall increase to the minimum ethanol selling price compared to the conventional logistic supply system. While the overall costs do increase slightly for the advanced logistic supply systems, the ability to mitigate moisture and ash in the system will improve the storage and conversion processes. In addition, being able to draw on feedstocks from further distances will decrease the risk of biomass supply to the conversion facility.« less

  16. Women, water supply and sanitation: INSTRAW's training initiatives.

    PubMed

    Tavares, J

    1997-01-01

    The International Research and Training Institute for the Advancement of Women (INSTRAW) has worked on women, water supply and sanitation since 1986. The program aims to establish the relationship between women, water supply and sanitation and the promotion of the needs of women and their participation in Water Supply and Sanitation projects. Using a multimedia and modular approach, the training package on Women, Water Supply and Sanitation aims to provide an overview for the different government agencies, engineers, trainers and managers involved in water supply and sanitation projects. The six modules contained in this package include: 1) The International Drinking Water Supply and Sanitation Decade and beyond; 2) The Participation of Women in planning, Choice of Technology and Implementation of Sustainable Water Supply and Sanitation Projects; 3) Role of Women in Hygiene Education and Training Activities for Water Supply and Sanitation Projects; 4) Involvement of Women in Management of Water resources, Water Supply and Waste Disposal; 5) Women and Waste Management; and 6) Evaluation and Monitoring of Water Supply and Sanitation Programs, Projects and the Role of Women. In addition, each module comprises five components including objective description, detailed bibliography, feedback tools for each modular unit, lesson plan and guides for trainers and users, and audiovisual aids. In the face of water scarcity, INSTRAW highlights the importance of women¿s participation in the sustainable use of water supply.

  17. Systematic impact assessment on inter-basin water transfer projects of the Hanjiang River Basin in China

    NASA Astrophysics Data System (ADS)

    Zhou, Yanlai; Guo, Shenglian; Hong, Xingjun; Chang, Fi-John

    2017-10-01

    China's inter-basin water transfer projects have gained increasing attention in recent years. This study proposes an intelligent water allocation methodology for establishing optimal inter-basin water allocation schemes and assessing the impacts of water transfer projects on water-demanding sectors in the Hanjiang River Basin of China. We first analyze water demands for water allocation purpose, and then search optimal water allocation strategies for maximizing the water supply to water-demanding sectors and mitigating the negative impacts by using the Standard Genetic Algorithm (SGA) and Adaptive Genetic Algorithm (AGA), respectively. Lastly, the performance indexes of the water supply system are evaluated under different scenarios of inter-basin water transfer projects. The results indicate that: the AGA with adaptive crossover and mutation operators could increase the average annual water transfer from the Hanjiang River by 0.79 billion m3 (8.8%), the average annual water transfer from the Changjiang River by 0.18 billion m3 (6.5%), and the average annual hydropower generation by 0.49 billion kW h (5.4%) as well as reduce the average annual unmet water demand by 0.40 billion m3 (9.7%), as compared with the those of the SGA. We demonstrate that the proposed intelligent water allocation schemes can significantly mitigate the negative impacts of inter-basin water transfer projects on the reliability, vulnerability and resilience of water supply to the demanding sectors in water-supplying basins. This study has a direct bearing on more intelligent and effectual water allocation management under various scenarios of inter-basin water transfer projects.

  18. Water stress, water salience, and the implications for water supply planning

    NASA Astrophysics Data System (ADS)

    Garcia, M. E.; Islam, S.

    2017-12-01

    Effectively addressing the water supply challenges posed by urbanization and climate change requires a holistic understanding of the water supply system, including the impact of human behavior on system dynamics. Decision makers have limits to available information and information processing capacity, and their attention is not equally distributed among risks. The salience of a given risk is higher when increased attention is directed to it and though perceived risk may increase, real risk does not change. Relevant to water supply planning is how and when water stress results in an increased salience of water risks. This work takes a socio-hydrological approach to develop a water supply planning model that includes water consumption as an endogenous variable, in the context of Las Vegas, NV. To understand the benefits and limitations of this approach, this model is compared to a traditional planning model that uses water consumption scenarios. Both models are applied to project system reliability and water stress under four streamflow and demographic scenarios, and to assess supply side responses to changing conditions. The endogenous demand model enables the identification of feedback between both supply and demand management decisions on future water consumption and system performance. This model, while specific to the Las Vegas case, demonstrates a prototypical modeling framework capable of examining water-supply demand interactions by incorporating water stress driven conservation.

  19. Solar heater/cooler for mass market

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report describes project to design, build, and test simple and affordable solar systems. Four combinations of heating, cooling, and domestic hot water supply systems were developed and installed. Test sites, plan for systems and components, and performance are discussed; text is complimented by detailed drawings and test data.

  20. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and facilities that may not be included in a rural water supply project? 404.10 Section 404.10 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.10 Are there certain types of infrastructure and facilities that may not be included in a rural water supply project? Yes. A rural water supply project may...

  1. Scenario-based water resources planning for utilities in the Lake Victoria region

    NASA Astrophysics Data System (ADS)

    Mehta, Vishal K.; Aslam, Omar; Dale, Larry; Miller, Norman; Purkey, David R.

    Urban areas in the Lake Victoria (LV) region are experiencing the highest growth rates in Africa. As efforts to meet increasing demand accelerate, integrated water resources management (IWRM) tools provide opportunities for utilities and other stakeholders to develop a planning framework comprehensive enough to include short term (e.g. landuse change), as well as longer term (e.g. climate change) scenarios. This paper presents IWRM models built using the Water Evaluation And Planning (WEAP) decision support system, for three towns in the LV region - Bukoba (Tanzania), Masaka (Uganda), and Kisii (Kenya). Each model was calibrated under current system performance based on site visits, utility reporting and interviews. Projected water supply, demand, revenues and costs were then evaluated against a combination of climate, demographic and infrastructure scenarios up to 2050. Our results show that water supply in all three towns is currently infrastructure limited; achieving existing design capacity could meet most projected demand until 2020s in Masaka beyond which new supply and conservation strategies would be needed. In Bukoba, reducing leakages would provide little performance improvement in the short-term, but doubling capacity would meet all demands until 2050. In Kisii, major infrastructure investment is urgently needed. In Masaka, streamflow simulations show that wetland sources could satisfy all demand until 2050, but at the cost of almost no water downstream of the intake. These models demonstrate the value of IWRM tools for developing water management plans that integrate hydroclimatology-driven supply to demand projections on a single platform.

  2. Pipeline bottoming cycle study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle workingmore » fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.« less

  3. R and D plans for Broad Area Energy Utilization Network System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Takemura, Yozo; Ishida, Hiromi; Yanagishita, Hiroshi

    1995-12-31

    In Japan, approximately 60 percent of the primary energy supply is lost as waste heat due to low thermal energy conversion efficiency. A lot of effort has been made towards energy conservation in industry since 1973 when the oil crisis happened. However, waste heat is not recovered sufficiently at low temperature. Since most of energy in residential and commercial areas is used for air-conditioning and hot water, the temperature of heat for residential and commercial use is almost equal to that of waste heat discharged from industrial sources. Therefore, the Broad Area Energy Utilization Network System (Eco-Energy City) project, whichmore » started in 1993 and will continue over a period of 8 years, is a large-scale national energy conservation project of the Agency of Industrial Science and technology (AIST) of the Ministry of International Trade and Industry (MITI). The aim of this project is to accelerate the full scale utilization of industrial waste heat for residential and commercial use by technological breakthroughs. The concept of the project is as follows: (1) Waste and unutilized heat discharged from industrial sources at relatively high temperature is recovered very efficiently, in multiple stages and in various ways. (2) Recovered heat is transported with a small heat loss over a long distance to residential and commercial areas that have various patterns of consuming relatively low-temperature heat. (3) Transported heat is supplied at consumer sites in different ways depending on the individual consumption pattern. (4) Thermal energy is utilized in the following forms: Cascaded use, combined use and recycling. The key to success is to develop innovative technologies of heat recovery, heat transport, heat supply and systematization of energy supply and demand.« less

  4. Forecasting Ontario's blood supply and demand.

    PubMed

    Drackley, Adam; Newbold, K Bruce; Paez, Antonio; Heddle, Nancy

    2012-02-01

    Given an aging population that requires increased medical care, an increasing number of deferrals from the donor pool, and a growing immigrant population that typically has lower donation rates, the purpose of this article is to forecast Ontario's blood supply and demand. We calculate age- and sex-specific donation and demand rates for blood supply based on 2008 data and project demand between 2008 and 2036 based on these rates and using population data from the Ontario Ministry of Finance. Results indicate that blood demand will outpace supply as early as 2012. For instance, while the total number of donations made by older cohorts is expected to increase in the coming years, the number of red blood cell (RBC) transfusions in the 70+ age group is forecasted grow from approximately 53% of all RBC transfusions in 2008 (209,515) in 2008 to 68% (546,996) by 2036. A series of alternate scenarios, including projections based on a 2% increase in supply per year and increased use of apheresis technology, delays supply shortfalls, but does not eliminate them without active management and/or multiple methods to increase supply and decrease demand. Predictions show that demand for blood products will outpace supply in the near future given current age- and sex-specific supply and demand rates. However, we note that the careful management of the blood supply by Canadian Blood Services, along with new medical techniques and the recruitment of new donors to the system, will remove future concerns. © 2012 American Association of Blood Banks.

  5. 78 FR 45918 - Application for Presidential Permit; Soule River Hydroelectric Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Hydro. Soule Hydro proposes to construct and operate a high-voltage alternating current (HVAC... 8-mile long, 138 kilovolt (kV) HVAC 3-phase submarine cable that would be laid on the floor of... whether the proposed project would adversely affect the operation of the U.S. electric power supply system...

  6. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  7. Role of measurement in feedback-controlled quantum engines

    NASA Astrophysics Data System (ADS)

    Yi, Juyeon; Kim, Yong Woon

    2018-01-01

    In feedback controls, measurement is an essential step in designing protocols according to outcomes. For quantum mechanical systems, measurement has another effect; to supply energy to the measured system. We verify that in feedback-controlled quantum engines, measurement plays a dual role; not only as an auxiliary to perform feedback control but also as an energy supply to drive the engines. We consider a specific engine cycle exploiting feedback control followed by projective measurement and show that the maximum bound of the extractable work is set by both the efficacy of the feedback control and the energy change caused by projective measurement. We take a concrete example of an engine using an immobile spin-1/2 particle as a working substance and suggest two possible scenarios for work extraction.

  8. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    USGS Publications Warehouse

    Hanson, Randall T.; Lockwood, Brian; Schmid, Wolfgang

    2014-01-01

    The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations and assumptions of 2009 urban water demand and land use. Water supplied directly from precipitation, and indirectly from reuse, captured local runoff, and groundwater is necessary but inadequate to satisfy agricultural demand without coastal and regional storage depletion that facilitates seawater intrusion. These facilities reduce potential seawater intrusion by about 45% with groundwater levels in the four regions served by the CDS projected to recover to levels a few feet above sea level. The projected recoveries are not high enough to prevent additional seawater intrusion during dry-year periods or in the deeper aquifers where pumpage is greater. While these facilities could reduce coastal pumpage by about 55% of the historical 2000–2009 pumpage for these regions, and some of the water is delivered in excess of demand, other coastal regions continue to create demands on coastal pumpage that will need to be replaced to reduce seawater intrusion. In addition, inland urban and agricultural demands continue to sustain water levels below sea level causing regional landward gradients that also drive seawater intrusion. Seawater intrusion is reduced by about 45% but it supplies about 55% of the recovery of groundwater levels in the coastal regions served by the CDS. If economically feasible, water from summer agricultural runoff and tile-drain returnflows could be another potential local source of water that, if captured and reused, could offset the imbalance between supply and demand as well as reducing discharge of agricultural runoff into the National Marine Sanctuary of Monterey Bay. A BMP update (2012) identifies projects and programs that will fund a conservation program and will provide additional, alternative water sources to reduce or replace coastal and inland pumpage, and to replenish the aquifers with managed aquifer recharge in an inland portion of the Pajaro Valley.

  9. Regional demand and supply projections for outdoor recreation

    Treesearch

    Donald B. K. English; Carter J. Betz; J. Mark Young; John C. Bergstrom; H. Ken Cordell

    1993-01-01

    This paper develops regional recreation supply and demand projections, by combining coefficients from the national 1989 RPA Assessment models with regional regressor values. Regional recreation opportunity estimates also are developed, based on regional travel behavior. Results show important regional variations in projections of recreation opportunities, trip supply,...

  10. RETScreen Plus Software Tutorial

    NASA Technical Reports Server (NTRS)

    Ganoe, Rene D.; Stackhouse, Paul W., Jr.; DeYoung, Russell J.

    2014-01-01

    Greater emphasis is being placed on reducing both the carbon footprint and energy cost of buildings. A building's energy usage depends upon many factors one of the most important is the local weather and climate conditions to which it's electrical, heating and air conditioning systems must respond. Incorporating renewable energy systems, including solar systems, to supplement energy supplies and increase energy efficiency is important to saving costs and reducing emissions. Also retrofitting technologies to buildings requires knowledge of building performance in its current state, potential future climate state, projection of potential savings with capital investment, and then monitoring the performance once the improvements are made. RETScreen Plus is a performance analysis software module that supplies the needed functions of monitoring current building performance, targeting projected energy efficiency improvements and verifying improvements once completed. This tutorial defines the functions of RETScreen Plus as well as outlines the general procedure for monitoring and reporting building energy performance.

  11. Hydrogen in the U.S. energy picture

    NASA Technical Reports Server (NTRS)

    Kelley, J. H.; Manvi, R.

    1979-01-01

    A study of hydrogen in the U.S. program performed by the Hydrogen Energy Systems Technology (HEST) investigation is reported. Historic production and use of hydrogen, hydrogen use projections, hydrogen supply, economics of hydrogen production and supply, and future research and development needs are discussed. The study found current U.S. hydrogen utilization to be dominated by chemical and petroleum industries, and to represent 3% of total energy consumption. Hydrogen uses are projected to grow by a factor of 5 to 20 during the remainder of this century, and new applications in synthetic fuel from coal manufacture and directly as energy storage or fuel are expected to develop. The study concluded that development of new methods of supplying hydrogen replacing natural gas and petroleum feedstocks with alternate sources such as coal and heavy oils, and electrolysis techniques is imperative.

  12. A study of industrial hydrogen and syngas supply systems

    NASA Technical Reports Server (NTRS)

    Amos, W. J.; Solomon, J.; Eliezer, K. F.

    1979-01-01

    The potential and incentives required for supplying hydrogen and syngas feedstocks to the U.S. chemical industry from coal gasification systems were evaluated. Future hydrogen and syngas demand for chemical manufacture was estimated by geographic area and projected economics for hydrogen and syngas manufacture was estimated with geographic area of manufacture and plant size as parameters. Natural gas, oil and coal feedstocks were considered. Problem areas presently affecting the commercial feasibility of coal gasification discussed include the impact of potential process improvements, factors involved in financing coal gasification plants, regulatory barriers affecting coal gasification, coal mining/transportation, air quality regulations, and competitive feedstock pricing barriers. The potential for making coal gasification the least costly H2 and syngas supply option. Options to stimulate coal gasification system development are discussed.

  13. Manual for Users of the Unitary Plan Wind Tunnel Facilities of the National Advisory Committee for Aeronautics

    DTIC Science & Technology

    1956-01-01

    Company Projects andGoveinment Projects are established by the NACA by the twentieth day of each month for the ensuing six-month period. GENERAL CLASSES...18 INFORMATION TO BE SUPPLIED BY THE USER .. .. ... ...... ..... ... 19 Model Details and Stress Analysis...system which uses an offset adapter is also available (figure 5). The design loads of the support system and components are tabulated below: Basic Zlent

  14. Multi-objective Optimization of Solar-driven Hollow-fiber Membrane Distillation Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nenoff, Tina M.; Moore, Sarah E.; Mirchandani, Sera

    Securing additional water sources remains a primary concern for arid regions in both the developed and developing world. Climate change is causing fluctuations in the frequency and duration of precipitation, which can be can be seen as prolonged droughts in some arid areas. Droughts decrease the reliability of surface water supplies, which forces communities to find alternate primary water sources. In many cases, ground water can supplement the use of surface supplies during periods of drought, reducing the need for above-ground storage without sacrificing reliability objectives. Unfortunately, accessible ground waters are often brackish, requiring desalination prior to use, and underdevelopedmore » infrastructure and inconsistent electrical grid access can create obstacles to groundwater desalination in developing regions. The objectives of the proposed project are to (i) mathematically simulate the operation of hollow fiber membrane distillation systems and (ii) optimize system design for off-grid treatment of brackish water. It is anticipated that methods developed here can be used to supply potable water at many off-grid locations in semi-arid regions including parts of the Navajo Reservation. This research is a collaborative project between Sandia and the University of Arizona.« less

  15. VizieR Online Data Catalog: LAMOST-Kepler MKCLASS spectral classification (Gray+, 2016)

    NASA Astrophysics Data System (ADS)

    Gray, R. O.; Corbally, C. J.; De Cat, P.; Fu, J. N.; Ren, A. B.; Shi, J. R.; Luo, A. L.; Zhang, H. T.; Wu, Y.; Cao, Z.; Li, G.; Zhang, Y.; Hou, Y.; Wang, Y.

    2016-07-01

    The data for the LAMOST-Kepler project are supplied by the Large Sky Area Multi Object Fiber Spectroscopic Telescope (LAMOST, also known as the Guo Shou Jing Telescope). This unique astronomical instrument is located at the Xinglong observatory in China, and combines a large aperture (4 m) telescope with a 5° circular field of view (Wang et al. 1996ApOpt..35.5155W). Our role in this project is to supply accurate two-dimensional spectral types for the observed targets. The large number of spectra obtained for this project (101086) makes traditional visual classification techniques impractical, so we have utilized the MKCLASS code to perform these classifications. The MKCLASS code (Gray & Corbally 2014AJ....147...80G, v1.07 http://www.appstate.edu/~grayro/mkclass/), an expert system designed to classify blue-violet spectra on the MK Classification system, was employed to produce the spectral classifications reported in this paper. MKCLASS was designed to reproduce the steps skilled human classifiers employ in the classification process. (2 data files).

  16. Solar heating and cooling demonstration project at the Florida solar energy center

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. The system was designed to supply approximately 70 percent of the annual cooling and 100 percent of the heating load. The project provides unique high temperature, nonimaging, nontracking, evacuated tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection. Information is provided on the system's acceptance test results operation, controls, hardware and installation, including detailed drawings.

  17. Trash to Supply Gas (TtSG) Project Overview

    NASA Technical Reports Server (NTRS)

    Hintze, Paul; Santiago-Maldonado, Edgardo; Kulis, Michael J.; Lytle, John K.; Fisher, John W.; Vaccaro, Helen; Ewert, Michael K.; Broyan, James L.

    2012-01-01

    Technologies that reduce logistical needs are a key to long term space missions. Currently, trash and waste generated during a mission is carried during the entire roundtrip mission or stored inside a logistic module which is de-orbited into Earth's atmosphere for destruction. The goal of the Trash to Supply Gas (TtSG) project is to develop space technology alternatives for converting trash and other waste materials from human spaceflight into high-value products that might include propellants or power system fuels in addition to life support oxygen and water. In addition to producing a useful product from waste, TtSG will decrease the volume needed to store waste on long term space missions. This paper presents an overview of the TtSG technologies and future plans for the project.

  18. A new computer-controlled multi-channel high voltage supply system for GRACE instrumentation

    NASA Astrophysics Data System (ADS)

    Manna, A.; Chakrabarti, S.; Mukhopadhayay, P. K.

    2002-03-01

    The high energy gamma ray telescopes being set up by the Bhabha Atomic Research Institute Centre (BARC) at Mt. Abu, Rajasthan, as part of the GRACE project, require a very large number (~ 1000) of programmable high voltage power supplies for biasing photomultiplier tubes for the detection and characterization of the atmospheric Cerenkov events. These HV supplies need to be very compact, lightweight and rugged, as they will be mounted on the base of the moving telescope. This paper describes the design aspects of the overall HV system and the performance of the prototype HV modules developed for such applications. In the new design, the inverter switching frequency of the HV supplies has been increased threefold as compared to the earlier design, and surface mounted devices have been used to achieve overall size and weight reductions. The system consists of multiple HV modules, each containing 16 independently programmable HV supplies. Each HV module has an on-board micro-controller for doing control and supervisory functions and is interconnected via a serial 12C bus. The HV supplies have built in over voltage/current, thermal overload protections with output voltage readback and adjustable slew rate control facilities.

  19. NASA's Evolutionary Xenon Thruster (NEXT) Power Processing Unit (PPU) Capacitor Failure Root Cause Analysis

    NASA Technical Reports Server (NTRS)

    Soeder, James F.; Pinero, Luis; Schneidegger, Robert; Dunning, John; Birchenough, Art

    2012-01-01

    The NASA's Evolutionary Xenon Thruster (NEXT) project is developing an advanced ion propulsion system for future NASA missions for solar system exploration. A critical element of the propulsion system is the Power Processing Unit (PPU) which supplies regulated power to the key components of the thruster. The PPU contains six different power supplies including the beam, discharge, discharge heater, neutralizer, neutralizer heater, and accelerator supplies. The beam supply is the largest and processes up to 93+% of the power. The NEXT PPU had been operated for approximately 200+ hours and has experienced a series of three capacitor failures in the beam supply. The capacitors are in the same, nominally non-critical location the input filter capacitor to a full wave switching inverter. The three failures occurred after about 20, 30, and 135 hours of operation. This paper provides background on the NEXT PPU and the capacitor failures. It discusses the failure investigation approach, the beam supply power switching topology and its operating modes, capacitor characteristics and circuit testing. Finally, it identifies root cause of the failures to be the unusual confluence of circuit switching frequency, the physical layout of the power circuits, and the characteristics of the capacitor.

  20. NASA's Evolutionary Xenon Thruster (NEXT) Power Processing Unit (PPU) Capacitor Failure Root Cause Analysis

    NASA Technical Reports Server (NTRS)

    Soeder, James F.; Scheidegger, Robert J.; Pinero, Luis R.; Birchenough, Arthur J.; Dunning, John W.

    2012-01-01

    The NASA s Evolutionary Xenon Thruster (NEXT) project is developing an advanced ion propulsion system for future NASA missions for solar system exploration. A critical element of the propulsion system is the Power Processing Unit (PPU) which supplies regulated power to the key components of the thruster. The PPU contains six different power supplies including the beam, discharge, discharge heater, neutralizer, neutralizer heater, and accelerator supplies. The beam supply is the largest and processes up to 93+% of the power. The NEXT PPU had been operated for approximately 200+ hr and has experienced a series of three capacitor failures in the beam supply. The capacitors are in the same, nominally non-critical location-the input filter capacitor to a full wave switching inverter. The three failures occurred after about 20, 30, and 135 hr of operation. This paper provides background on the NEXT PPU and the capacitor failures. It discusses the failure investigation approach, the beam supply power switching topology and its operating modes, capacitor characteristics and circuit testing. Finally, it identifies root cause of the failures to be the unusual confluence of circuit switching frequency, the physical layout of the power circuits, and the characteristics of the capacitor.

  1. A Systems Approach to Manage Drinking Water Quality ...

    EPA Pesticide Factsheets

    Drinking water supplies can be vulnerable to impacts from short-term weather events, long-term changes in land-use and climate, and water quality controls in treatment and distribution. Disinfection by-product (DBP) formation in drinking water is a prominent example to illustrate the water supply vulnerability and examine technological options in adaptation. Total organic carbon (TOC) in surface water can vary significantly due to changes or a combination of changes in watershed land use, climate variability, and extreme meteorological events (e.g., hurricanes). On the other hand, water demand is known to vary temporarily and spatially leading to changes in water ages and hence DBP formation potential. Typically a drinking water facility is designed to operate within a projected range of influent water quality and water demand. When the variations exceed the design range, water supply becomes vulnerable in the compliance to Safe Drinking Water Act (SDWA) Stage-II disinfection by-product (DBP) rules. This paper describes a framework of systems-level modeling, monitoring and control in adaptive planning and system operation. The framework, built upon the integration of model projections, adaptive monitoring and systems control, has three primary functions. Its advantages and limitations will be discussed with the application examples in Cincinnati (Ohio, USA) and Las Vegas (Nevada, USA). At a conceptual level, an integrated land use and hydrological model

  2. 75 FR 51477 - Notice of Availability of the Draft Environmental Impact Statement for the Alamogordo Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... Regional Water Supply Project, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... Alamogordo Regional Water Supply Project and by this notice is announcing the opening of the comment period... Alamogordo Regional Water Supply Project Draft EIS within 60 days following the date the Environmental...

  3. Initial Conceptualization and Characterization of a Navy Automated Publishing System. Volume 2. Technical Report.

    DTIC Science & Technology

    1980-01-01

    its mission. The project was funded by the Naval Supply Systems (bxmand (NAVSUP) under the auspices of its Automated Graphic Sciences ( AGS ) program...Cost in the Federal Government, FY 1967-1977 3-6 3.4 Total U.S. Population Ages 18-24 Years 3-9 3.5 Supply and Demand for Young Men 3-10 3.6 Typical...NPPS, as reflected for instance in reduced cost per copy, is of benefit to all those it serves: (’NET, currently limited by appropriation ceilings to

  4. 77 FR 66454 - Gulf LNG Liquefaction Company, LLC; Application for Long-Term Authorization To Export Liquefied...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... integrated U.S. natural gas pipeline system. GLLC notes that due to the Gulf LNG Terminal's direct access to multiple major interstate pipelines and indirect access to the national gas pipeline grid, the Project's... possible impacts that the Export Project might have on natural gas supply and pricing. Navigant's analysis...

  5. Using Technology Readiness Level (TRL), Life Cycle Cost (LCC), and Other Metrics to Supplement Equivalent System Mass (ESM) in Advanced Life Support (ALS)

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2003-01-01

    The ALS project plan goals are reducing cost, improving performance, and achieving flight readiness. ALS selects projects to advance the mission readiness of low cost, high performance technologies. The role of metrics is to help select good projects and report progress. The Equivalent Mass (EM) of a system is the sum of the estimated mass of the hardware, of its required materials and spares, and of the pressurized volume, power supply, and cooling system needed to support the hardware in space. EM is the total payload launch mass needed to provide and support a system. EM is directly proportional to the launch cost.

  6. Integrated urban systems model with multiple transportation supply agents.

    DOT National Transportation Integrated Search

    2012-10-01

    This project demonstrates the feasibility of developing quantitative models that can forecast future networks under : current and alternative transportation planning processes. The current transportation planning process is modeled : based on empiric...

  7. 75 FR 10866 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... rotating drum filter upgrades and a water quality monitoring system expansion, are not available from... quality. Expansion of the recirculation system requires adding a second drum filter for aquaculture water treatment. The existing system uses a drum filter manufactured by PRAqua Supplies Ltd.--Nanaimo, British...

  8. Hydrogen energy systems technology study

    NASA Technical Reports Server (NTRS)

    Kelley, J. H.

    1975-01-01

    The paper discusses the objectives of a hydrogen energy systems technology study directed toward determining future demand for hydrogen based on current trends and anticipated new uses and identifying the critical research and technology advancements required to meet this need with allowance for raw material limitations, economics, and environmental effects. Attention is focused on historic production and use of hydrogen, scenarios used as a basis for projections, projections of energy sources and uses, supply options, and technology requirements and needs. The study found more than a billion dollar annual usage of hydrogen, dominated by chemical-industry needs, supplied mostly from natural gas and petroleum feedstocks. Evaluation of the progress in developing nuclear fusion and solar energy sources relative to hydrogen production will be necessary to direct the pace and character of research and technology work in the advanced water-splitting areas.

  9. Project Ares 3

    NASA Technical Reports Server (NTRS)

    Raymer, Dan; Russell, Phyllis; Fox, Tim; Meyers, Doug; Lovric, Steven; Grabow, Robert; Epp, Manfred; Wynn, Warren, Jr.; Mako, Zoltan; Linzner, Gunther

    1992-01-01

    The mission of Project Ares is to design and fabricate an Earth prototype, autonomous flying rover capable of flying on the Martian surface. The project was awarded to California State University, Northridge (CSUN) in 1989 where an in-depth paper study was completed. The second year's group, Project Ares 2, designed and fabricated a full-scale flight demonstration aircraft. Project Ares 3, the third and final group, is responsible for propulsion system design and installation, controls and instrumentation, and high altitude testing. The propulsion system consists of a motor and its power supply, geartrain, and propeller. The motor is a four-brush DC motor powered by a 50-V NiCd battery supply. A pulley and belt arrangement is used for the geartrain and includes light weight, low temperature materials. The propeller is constructed from composite materials which ensures high strength and light weight, and is specifically developed to provide thrust at extremely high altitudes. The aircraft is controlled with a ground-based radio control system and an autopilot which will activate in the event that the control signal is lost. A transponder is used to maintain radar contact for ground tracking purposes. The aircraft possesses a small, onboard computer for collecting and storing flight data. To safeguard the possibility of computer failure, all flight data is transmitted to a ground station via a telemetry system. An initial, unpowered, low-level test flight was completed in August of 1991. Testing of systems integration in the second low-level test flight resulted in loss of elevator control which caused considerable damage on landing. Complete failure analysis and repairs are scheduled for September of 1992.

  10. 75 FR 77000 - South Coast Conduit/Upper Reach Reliability Project, Santa Barbara County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... pipeline for improving water supply reliability to Cachuma Project (CP) and State Water Project (SWP... percent of the water supply for communities along the South Coast of Santa Barbara County. Reclamation... demands it is not able to provide the water needed. No redundant supply or pipeline exists to convey CVP...

  11. Thermal energy supply optimization for Edgewood Area, US Army Aberdeen Proving Ground: Energy supply alternatives. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCammon, T.L.; Dilks, C.L.; Savoie, M.J.

    1995-09-01

    Relatively poor performance at the aging central heating plants (OH Ps) and planned changes in steam demand at Aberdeen Proving Ground (APG) Edgewood Area, Aberdeen, MD warranted an investigation of alternatives for providing thermal energy to the installation. This study: (1) evaluated the condition of the APG CHPs and heat distribution system, (2) identified thermal energy supply problems and cost-effective technologies to maintain APG`s capability to produce and distribute the needed thermal energy, and (3) recommended renovation and modernization projects for the system. Heating loads were analyzed using computer simulations, and life cycle costs were developed for each alternative. Recommendedmore » alternatives included upgrading the existing system, installing new boilers, consolidating the central heating plants, and introducing the use of absorption chilling.« less

  12. Method and apparatus for multiple-projection, dual-energy x-ray absorptiometry scanning

    NASA Technical Reports Server (NTRS)

    Feldmesser, Howard S. (Inventor); Magee, Thomas C. (Inventor); Charles, Jr., Harry K. (Inventor); Beck, Thomas J. (Inventor)

    2007-01-01

    Methods and apparatuses for advanced, multiple-projection, dual-energy X-ray absorptiometry scanning systems include combinations of a conical collimator; a high-resolution two-dimensional detector; a portable, power-capped, variable-exposure-time power supply; an exposure-time control element; calibration monitoring; a three-dimensional anti-scatter-grid; and a gantry-gantry base assembly that permits up to seven projection angles for overlapping beams. Such systems are capable of high precision bone structure measurements that can support three dimensional bone modeling and derivations of bone strength, risk of injury, and efficacy of countermeasures among other properties.

  13. Stereo optical guidance system for control of industrial robots

    NASA Technical Reports Server (NTRS)

    Powell, Bradley W. (Inventor); Rodgers, Mike H. (Inventor)

    1992-01-01

    A device for the generation of basic electrical signals which are supplied to a computerized processing complex for the operation of industrial robots. The system includes a stereo mirror arrangement for the projection of views from opposite sides of a visible indicia formed on a workpiece. The views are projected onto independent halves of the retina of a single camera. The camera retina is of the CCD (charge-coupled-device) type and is therefore capable of providing signals in response to the image projected thereupon. These signals are then processed for control of industrial robots or similar devices.

  14. Scenario Planning of California Water Resources with Climate Change

    NASA Astrophysics Data System (ADS)

    Yin, H.; Chung, F. I.; Anderson, J.

    2008-12-01

    Several advances have been made in using climate change projection information in water resources planning in California. Since there is uncertainty about future climate, 12 climate change projections were used to assess impacts on SWP and CVP operations. Average results for the 12 projections are presented in this summary. Current SWP and CVP infrastructure, regulations and operating rules were assumed. These studies indicate that climate change is expected to reduce the reliability of the SWP and CVP water supply systems. Annual Delta exports are expected to be reduced by 8% by mid-century and 15% by the end of the century. This would lead to reduced water deliveries south of the Delta. Decreases in reservoir carryover storage of 16% by mid-century and 28% by the end of the century would reduce the system's flexibility during water shortages. Groundwater pumping in the Sacramento Valley is expected to increase by 8% by mid-century and by 13% at the end of the century to augment surface water supplies. Power supply from the combined SWP and CVP is expected to decrease by 5% at mid-century and 8% by the end of the century. It is anticipated that the SWP and CVP will become vulnerable to operational interruption in about 10% of the years by mid-century and 15% of the years at the end of the century. To meet current regulatory requirements and to maintain minimum system operations during the vulnerable years, an additional 420 TAF/year of water by mid-century and an additional 610 TAF/year of water by the end of the century would be needed. This water could be obtained through additional water supplies, reductions in water demands, or a combination of the two. These results indicate a need to explore adaptation measures to improve the reliability of future water supplies in California. Because uncertainties associated with impacts analyses increase as the projection moves further into the future, and because a practical engineering planning horizon for most facilities is less than 50 years, DWR believes that the mid-century analyses are more relevant to water resources planning and management. However, the end of the century analyses will serve as a useful reference guide since many water facilities are expected to have useful lives into the next century.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenkel, Philip; Holcomb, Rodney B.

    In order for the biofuel industry to meet the RFS benchmarks for biofuels, new feedstock sources and production systems will have to be identified and evaluated. The Southern Plains has the potential to produce over a billion gallons of biofuels from regionally produced alternative crops, agricultural residues, and animal fats. While information on biofuel conversion processes is available, it is difficult for entrepreneurs, community planners and other interested individuals to determine the feasibility of biofuel processes or to match production alternatives with feed stock availability and community infrastructure. This project facilitates the development of biofuel production from these regionally availablemore » feed stocks. Project activities are concentrated in five major areas. The first component focused on demonstrating the supply of biofuel feedstocks. This involves modeling the yield and cost of production of dedicated energy crops at the county level. In 1991 the DOE selected switchgrass as a renewable source to produce transportation fuel after extensive evaluations of many plant species in multiple location (Caddel et al,. 2010). However, data on the yield and cost of production of switchgrass are limited. This deficiency in demonstrating the supply of biofuel feedstocks was addressed by modeling the potential supply and geographic variability of switchgrass yields based on relationship of available switchgrass yields to the yields of other forage crops. This model made it possible to create a database of projected switchgrass yields for five different soil types at the county level. A major advantage of this methodology is that the supply projections can be easily updated as improved varieties of switchgrass are developed and additional yield data becomes available. The modeling techniques are illustrated using the geographic area of Oklahoma. A summary of the regional supply is then provided.« less

  16. California Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project--shallow aquifer assessment

    USGS Publications Warehouse

    ,

    2013-01-01

    The California State Water Resources Control Board’s (SWRCB) GAMA Program is a comprehensive assessment of statewide groundwater quality in California. From 2004 to 2012, the GAMA Program’s Priority Basin Project focused on assessing groundwater resources used for public drinking-water supplies. More than 2,000 public-supply wells were sampled by U.S. Geological Survey (USGS) for this effort. Starting in 2012, the GAMA Priority Basin Project began an assessment of water resources in shallow aquifers in California. These shallow aquifers provide water for domestic and small community-supply wells, which are often drilled to shallower depths in the groundwater system than public-supply wells. Shallow aquifers are of interest because shallow groundwater may respond more quickly and be more susceptible to contamination from human activities at the land surface, than the deeper aquifers. The SWRCB’s GAMA Program was developed in response to the Groundwater Quality Monitoring Act of 2001 (Water Code sections 10780-10782.3): a public mandate to assess and monitor the quality of groundwater resources used for drinking-water supplies, and to increase the availability of information about groundwater quality to the public. The U.S. Geological Survey is the technical lead of the Priority Basin Project. Stewardship of California’s groundwater resources is a responsibility shared between well owners, communities, and the State. Participants and collaborators in the GAMA Program include Regional Water Quality Control Boards, Department of Water Resources, Department of Public Health, local and regional groundwater management entities, county and local water agencies, community groups, and private citizens. Well-owner participation in the GAMA Program is entirely voluntary.

  17. WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allan Jones

    2003-09-01

    This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energymore » markets.« less

  18. Modeling Household Water Consumption in a Hydro-Institutional System - The Case of Jordan

    NASA Astrophysics Data System (ADS)

    Klassert, C. J. A.; Gawel, E.; Klauer, B.; Sigel, K.

    2014-12-01

    Jordan faces an archetypal combination of high water scarcity, with a per capita water availability of around 150 CM per year significantly below the absolute scarcity threshold of 500 CM, and strong population growth, especially due to the Syrian refugee crisis. This poses a severe challenge to the already strained institutions in the Jordanian water sector. The Stanford-led G8 Belmont Forum project "Integrated Analysis of Freshwater Resources Sustainability in Jordan" aims at analyzing the potential role of water sector institutions in the pursuit of a sustainable freshwater system performance. In order to do so, the project develops a coupled hydrological and agent-based model, allowing for the exploration of physical as well as socio-economic and institutional scenarios for Jordan's water sector. The part of this integrated model in focus here is the representation of household behavior in Jordan's densely populated capital Amman. Amman's piped water supply is highly intermittent, which also affects its potability. Therefore, Amman's citizens rely on various decentralized modes of supply, depending on their socio-economic characteristics. These include water storage in roof-top and basement tanks, private tanker supply, and the purchase of bottled water. Capturing this combination of centralized and decentralized supply modes is important for an adequate representation of water consumption behavior: Firstly, it will affect the impacts of supply-side and demand-side policies, such as reductions of non-revenue water (including illegal abstractions), the introduction of continuous supply, support for storage enhancements, and water tariff reforms. Secondly, it is also necessary to differentiate the impacts of any policy on the different socio-economic groups in Amman. In order to capture the above aspects of water supply, our model is based on the tiered supply curve approach, developed by Srinivasan et al. in 2011 to model a similar situation in Chennai, India. To tailor our model to the situation in Amman, we rely on sectoral data, existing literature analyses and expert discussions with Jordanian water sector representatives. Our modeling approach allows us to directly compare policies affecting both centralized and decentralized elements of the system within a common framework.

  19. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water supply project in § 404.2; and (b) Be located in a Reclamation State, as defined in § 404.2. ...

  20. Manual of CENIS Operating Procedures and Computer Software.

    ERIC Educational Resources Information Center

    Iowa State Univ. of Science and Technology, Ames. Statistical Lab.

    The Career Education Needs Information System (CENIS) is a data collection analysis, and reporting system designed to provide for most technical occupations current and projected personnel needs of employers in Iowa, incoming student preferences, expected supply of graduates, and outcomes of area school graduates during the latest three year…

  1. Historical Evidence of Importance to the Industrialization of Flat-plate Silicon Photovoltaic Systems, Volume 2

    NASA Technical Reports Server (NTRS)

    Smith, J. L.; Gates, W. R.; Lee, T.

    1978-01-01

    Problems which may arise as the low cost silicon solar array (LSSA) project attempts to industrialize the production technologies are defined. The charge to insure an annual production capability of 500 MW peak for the photovoltaic supply industry by 1986 was critically examined, and focused on one of the motivations behind this goal-concern over the timely development of industrial capacity to supply anticipated demand. Conclusions from the analysis are utilized in a discussion of LSSA's industrialization plans, particularly the plans for pilot, demonstration and commercial scale production plants. Specific recommendations for the implementation of an industrialization task and the disposition of the project quantity goal were derived.

  2. Proceedings of Symposium on Cost Estimating for Water Supply Planning Studies Held at Tampa, Florida on 14-16 March 1983.

    DTIC Science & Technology

    1983-09-01

    Science, Art, or Witchcraft ?" which summarizes the state of the art and describes some important issues in planning level estimates in water resources...REPORT: AD#: P1o 902 TITLE:Panning Level Cost Estimating--Science, Art, or Witchcraft . P01 903 Planning Water Supply Projects: The Systems Estimate...OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 PLANNING LEVEL COST ESTIMATING--SCIENCE, ART, OR WITCHCRAFT by * PLANNING WATER

  3. Intelligence and Electronic Warfare (IEW) Streamlining Project. Volume 3. Reference Documentation (Part 5)

    DTIC Science & Technology

    1992-11-18

    Army. He is a graduate of Henderson State Univer- sity, Arkadelphia, Arkansas, and holds a master ofspend on financial management controls. Asset...supply system, he will receive credit receipts, and making monthly reconciliations with from the tactical unit financial management infor- activi ies at...obtain financial management rather than being added to the daily batch of requests information, and provide supply status information passed to the direct

  4. 77 FR 11084 - Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact Report for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Environmental Impact Statement/ Environmental Impact Report for the Proposed Cambria Water Supply Project, San... Report (EIS/EIR) to study, plan, and implement a project to provide for a reliable water supply for the... the area relying solely upon local groundwater for its current water supply. The groundwater supplies...

  5. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    ERIC Educational Resources Information Center

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  6. Operations system administration plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources,more » Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.« less

  7. Physician supply forecast: better than peering in a crystal ball?

    PubMed Central

    Roberfroid, Dominique; Leonard, Christian; Stordeur, Sabine

    2009-01-01

    Background Anticipating physician supply to tackle future health challenges is a crucial but complex task for policy planners. A number of forecasting tools are available, but the methods, advantages and shortcomings of such tools are not straightforward and not always well appraised. Therefore this paper had two objectives: to present a typology of existing forecasting approaches and to analyse the methodology-related issues. Methods A literature review was carried out in electronic databases Medline-Ovid, Embase and ERIC. Concrete examples of planning experiences in various countries were analysed. Results Four main forecasting approaches were identified. The supply projection approach defines the necessary inflow to maintain or to reach in the future an arbitrary predefined level of service offer. The demand-based approach estimates the quantity of health care services used by the population in the future to project physician requirements. The needs-based approach involves defining and predicting health care deficits so that they can be addressed by an adequate workforce. Benchmarking health systems with similar populations and health profiles is the last approach. These different methods can be combined to perform a gap analysis. The methodological challenges of such projections are numerous: most often static models are used and their uncertainty is not assessed; valid and comprehensive data to feed into the models are often lacking; and a rapidly evolving environment affects the likelihood of projection scenarios. As a result, the internal and external validity of the projections included in our review appeared limited. Conclusion There is no single accepted approach to forecasting physician requirements. The value of projections lies in their utility in identifying the current and emerging trends to which policy-makers need to respond. A genuine gap analysis, an effective monitoring of key parameters and comprehensive workforce planning are key elements to improving the usefulness of physician supply projections. PMID:19216772

  8. The Earth System Documentation (ES-DOC) project

    NASA Astrophysics Data System (ADS)

    Murphy, S.; Greenslade, M. A.; Treshansky, A.; DeLuca, C.; Guilyardi, E.; Denvil, S.

    2013-12-01

    Earth System Documentation (ES-DOC) is an international project supplying high quality tools and services in support of Earth system documentation creation, analysis and dissemination. It is nurturing a sustainable standards based documentation ecosystem that aims to become an integral part of the next generation of exa-scale dataset archives. ES-DOC leverages open source software, and applies a software development methodology that places end-user narratives at the heart of all it does. ES-DOC has initially focused upon nurturing the Earth System Model (ESM) documentation eco-system. Within this context ES-DOC leverages the emerging Common Information Model (CIM) metadata standard, which has supported the following projects: ** Coupled Model Inter-comparison Project Phase 5 (CMIP5); ** Dynamical Core Model Inter-comparison Project (DCMIP-2012); ** National Climate Predictions and Projections Platforms (NCPP) Quantitative Evaluation of Downscaling Workshop (QED-2013). This presentation will introduce the project to a wider audience and will demonstrate the current production level capabilities of the eco-system: ** An ESM documentation Viewer embeddable into any website; ** An ESM Questionnaire configurable on a project by project basis; ** An ESM comparison tool reusable across projects; ** An ESM visualization tool reusable across projects; ** A search engine for speedily accessing published documentation; ** Libraries for streamlining document creation, validation and publishing pipelines.

  9. Veterinary medical manpower: supply-demand projections to 2020.

    PubMed

    McLaughlin, G W; Bard, H E; Talbot, R B

    1976-02-15

    A supply projection model to estimate the number of veterinarians available through the year 2020 was developed. When projected available manpower was compared with the need for veterinary medical services, as estimated in a National Academy of Science study, a net shortage was indicated in each year between 1976 and 2020. The manpower supply available if 3 additional veterinary colleges were developed in the United States was also estimated. It was concluded that, even with the additional output of these colleges, the supply of veterinarians will not keep pace with future needs for veterinary services.

  10. Research on modeling and conduction disturbance simulation of secondary power system in a device

    NASA Astrophysics Data System (ADS)

    Ding, Xu; Yu, Zhi-Yong; Jin, Rui

    2017-06-01

    To find electromagnetic interference (EMI) and other problems in the secondary power supply system design quickly and effectively, simulations are carried out under the Saber simulation software platform. The DC/DC converter model with complete performance and electromagnetic characteristics is established by combining parametric modeling with Mast language. By using the method of macro modeling, the hall current sensor and power supply filter model are established respectively based on the function, schematic diagram of the components. Also the simulation of the component model and the whole secondary power supply system are carried out. The simulation results show that the proposed model satisfies the functional requirements of the system and has high accuracy. At the same time, due to the ripple characteristics in the DC/DC converter modeling, it can be used as a conducted interference model to simulate the power bus conducted emission CE102 project under the condition that the simulated load is full, which provides a useful reference for the electromagnetic interference suppression of the system.

  11. Communicating food safety, authenticity and consumer choice. Field experiences.

    PubMed

    Syntesa, Heiner Lehr

    2013-04-01

    The paper reviews patented and non-patented technologies, methods and solutions in the area of food traceability. It pays special attention to the communication of food safety, authenticity and consumer choice. Twenty eight recent patents are reviewed in the areas of (secure) identification, product freshness indicators, meat traceability, (secure) transport of information along the supply chain, country/region/place of origin, automated authentication, supply chain management systems, consumer interaction systems. In addition, solutions and pilot projects are described in the areas of Halal traceability, traceability of bird's nests, cold chain management, general food traceability and other areas.

  12. 43 CFR 404.9 - What types of infrastructure and facilities may be included in an eligible rural water supply...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... related facilities required for the rural water supply project; (f) Equipment and management tools for... facilities may be included in an eligible rural water supply project? 404.9 Section 404.9 Public Lands... RURAL WATER SUPPLY PROGRAM Overview § 404.9 What types of infrastructure and facilities may be included...

  13. Graduates of Higher Education in the Food and Agricultural Sciences: An Analysis of Supply/Demand Relationship. Volume II--Home Economics.

    ERIC Educational Resources Information Center

    Coulter, Kyle Jane; Stanton, Marge

    Information on the supply of new college graduates seeking home economics-related positions, home economics job openings, and projected levels of employment is presented. Based on a Department of Agriculture manpower assessment project, supply and demand relationships through 1990 were analyzed, and supply data were aggregated by 11 educational…

  14. Accruals for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Data Integration 2000 Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf product solution with commercially proven business processes. The COTS product solution set, of PassPort and People Soft software, supports finance, supply and chemical management/Material Safety Data Sheet, human resources. Accruals are made at the project level. At the inception of each project, Project Management and the Accounts Payable Group make a mutual decision on whether periodic accrual entries should be made for it.

  15. Implications of shale gas exploitation for UK climate change targets under a production-based accounting system.

    NASA Astrophysics Data System (ADS)

    Turk, J.; Reay, D.; Haszeldine, S.

    2017-12-01

    The shale gas boom in the USA has seemingly decreased the greenhouse gas intensity of electricity generation in the USA over the last decade. The United Kingdom is supporting its own shale gas industry to increase its own domestic energy supply. The UK's climate change policy is underpinned by defined national carbon budgets periods. The UK has met Carbon Budget 1 (2008 - 2012) and is likely to meet the second and third carbon budgets (2013 - 2022). There is a projected shortcoming in the fourth carbon budget (2023 - 2027). This shortfall may be increased as the UK pursues a domestic shale gas industry. Under the current production-based GHG accounting system, the UK is incentivized to import natural gas rather than produce it domestically. If the projected gas supply were to be met by UK shale gas, we project additional greenhouse gas emissions which would need to be accommodated during Carbon Budget periods 3 - 6. Additionally, natural gas electricity generation will contribute to sustaining grid electricity emissions during the same time period within the traded European Union emissions cap.

  16. Design of Test Support Hardware for Advanced Space Suits

    NASA Technical Reports Server (NTRS)

    Watters, Jeffrey A.; Rhodes, Richard

    2013-01-01

    As a member of the Space Suit Assembly Development Engineering Team, I designed and built test equipment systems to support the development of the next generation of advanced space suits. During space suit testing it is critical to supply the subject with two functions: (1) cooling to remove metabolic heat, and (2) breathing air to pressurize the space suit. The objective of my first project was to design, build, and certify an improved Space Suit Cooling System for manned testing in a 1-G environment. This design had to be portable and supply a minimum cooling rate of 2500 BTU/hr. The Space Suit Cooling System is a robust, portable system that supports very high metabolic rates. It has a highly adjustable cool rate and is equipped with digital instrumentation to monitor the flowrate and critical temperatures. It can supply a variable water temperature down to 34 deg., and it can generate a maximum water flowrate of 2.5 LPM. My next project was to design and build a Breathing Air System that was capable of supply facility air to subjects wearing the Z-2 space suit. The system intakes 150 PSIG breathing air and regulates it to two operating pressures: 4.3 and 8.3 PSIG. It can also provide structural capabilities at 1.5x operating pressure: 6.6 and 13.2 PSIG, respectively. It has instrumentation to monitor flowrate, as well as inlet and outlet pressures. The system has a series of relief valves to fully protect itself in case of regulator failure. Both projects followed a similar design methodology. The first task was to perform research on existing concepts to develop a sufficient background knowledge. Then mathematical models were developed to size components and simulate system performance. Next, mechanical and electrical schematics were generated and presented at Design Reviews. After the systems were approved by the suit team, all the hardware components were specified and procured. The systems were then packaged, fabricated, and thoroughly tested. The next step was to certify the equipment for manned used, which included generating a Hazard Analysis and giving a presentation to the Test Readiness Review Board. Both of these test support systems will perform critical roles in the development of next-generation space suits. They will used on a regular basis to test the NASA's new Z-2 Space Suit. The Space Suit Cooling System is now the primary cooling system for all advanced suit tests.

  17. 2015 American College of Rheumatology Workforce Study: Supply and Demand Projections of Adult Rheumatology Workforce, 2015-2030.

    PubMed

    Battafarano, Daniel F; Ditmyer, Marcia; Bolster, Marcy B; Fitzgerald, John D; Deal, Chad; Bass, Ann R; Molina, Rodolfo; Erickson, Alan R; Hausmann, Jonathan S; Klein-Gitelman, Marisa; Imundo, Lisa F; Smith, Benjamin J; Jones, Karla; Greene, Kamilah; Monrad, Seetha U

    2018-04-01

    To describe the character and composition of the 2015 US adult rheumatology workforce, evaluate workforce trends, and project supply and demand for clinical rheumatology care for 2015-2030. The 2015 Workforce Study of Rheumatology Specialists in the US used primary and secondary data sources to estimate the baseline adult rheumatology workforce and determine demographic and geographic factors relevant to workforce modeling. Supply and demand was projected through 2030, utilizing data-driven estimations regarding the proportion and clinical full-time equivalent (FTE) of academic versus nonacademic practitioners. The 2015 adult workforce (physicians, nurse practitioners, and physician assistants) was estimated to be 6,013 providers (5,415 clinical FTE). At baseline, the estimated demand exceeded the supply of clinical FTE by 700 (12.9%). By 2030, the supply of rheumatology clinical providers is projected to fall to 4,882 providers, or 4,051 clinical FTE (a 25.2% decrease in supply from 2015 baseline levels). Demand in 2030 is projected to exceed supply by 4,133 clinical FTE (102%). The adult rheumatology workforce projections reflect a major demographic and geographic shift that will significantly impact the supply of the future workforce by 2030. These shifts include baby-boomer retirements, a millennial predominance, and an increase of female and part-time providers, in parallel with an increased demand for adult rheumatology care due to the growing and aging US population. Regional and innovative strategies will be necessary to manage access to care and reduce barriers to care for rheumatology patients. © 2018, American College of Rheumatology.

  18. Hydrogen: BOC-FW venture secures major Venezuela project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, A.

    1995-07-26

    BOC Gases and Foster Wheeler Power Systems (FW) have been awarded a $50-million project to supply a 50-million cu ft/day hydrogen (H{sub 2}) plant to Lagoven`s Amuay, Venezuela refinery for 1997 startup. BOC and FW have also formed a marketing agreement for on-site H{sub 2} plants in the Americas, extending a previous relationship covering Chile and Venezuela.

  19. Workforce Projections 2010-2020: Annual Supply and Demand Forecasting Models for Physical Therapists Across the United States.

    PubMed

    Landry, Michel D; Hack, Laurita M; Coulson, Elizabeth; Freburger, Janet; Johnson, Michael P; Katz, Richard; Kerwin, Joanne; Smith, Megan H; Wessman, Henry C Bud; Venskus, Diana G; Sinnott, Patricia L; Goldstein, Marc

    2016-01-01

    Health human resources continue to emerge as a critical health policy issue across the United States. The purpose of this study was to develop a strategy for modeling future workforce projections to serve as a basis for analyzing annual supply of and demand for physical therapists across the United States into 2020. A traditional stock-and-flow methodology or model was developed and populated with publicly available data to produce estimates of supply and demand for physical therapists by 2020. Supply was determined by adding the estimated number of physical therapists and the approximation of new graduates to the number of physical therapists who immigrated, minus US graduates who never passed the licensure examination, and an estimated attrition rate in any given year. Demand was determined by using projected US population with health care insurance multiplied by a demand ratio in any given year. The difference between projected supply and demand represented a shortage or surplus of physical therapists. Three separate projection models were developed based on best available data in the years 2011, 2012, and 2013, respectively. Based on these projections, demand for physical therapists in the United States outstrips supply under most assumptions. Workforce projection methodology research is based on assumptions using imperfect data; therefore, the results must be interpreted in terms of overall trends rather than as precise actuarial data-generated absolute numbers from specified forecasting. Outcomes of this projection study provide a foundation for discussion and debate regarding the most effective and efficient ways to influence supply-side variables so as to position physical therapists to meet current and future population demand. Attrition rates or permanent exits out of the profession can have important supply-side effects and appear to have an effect on predicting future shortage or surplus of physical therapists. © 2016 American Physical Therapy Association.

  20. The capacity of the US food system to accommodate improved diet quality: Projections to 2030

    USDA-ARS?s Scientific Manuscript database

    Objective: To estimate the capacity of the US agricultural system to produce enough food, in the right amounts, to accommodate a population shift toward healthier diet patterns. This analysis has immediate and long-term implications for the nutritional quality of the food supply, as well as for envi...

  1. DEVELOPMENT OF A SUSTAINABLE AND APPROPRIATE DRINKING WATER SYSTEM FOR MONTANA DE LUZ AND NUEVA ESPERANZA, HONDURAS

    EPA Science Inventory

    In this project, we plan to design an appropriate and sustainable water treatment and supply system for a small village (Nueva Esperanza) and nearby orphanage in rural Honduras. The orphanage, named “Montana de Luz,” is a home exclusively for children with HIV/A...

  2. Control method of Three-phase Four-leg converter based on repetitive control

    NASA Astrophysics Data System (ADS)

    Hui, Wang

    2018-03-01

    The research chose the magnetic levitation force of wind power generation system as the object. In order to improve the power quality problem caused by unbalanced load in power supply system, we combined the characteristics and repetitive control principle of magnetic levitation wind power generation system, and then an independent control strategy for three-phase four-leg converter was proposed. In this paper, based on the symmetric component method, the second order generalized integrator was used to generate the positive and negative sequence of signals, and the decoupling control was carried out under the synchronous rotating reference frame, in which the positive and negative sequence voltage is PI double closed loop, and a PI regulator with repetitive control was introduced to eliminate the static error regarding the fundamental frequency fluctuation characteristic of zero sequence component. The simulation results based on Matlab/Simulink show that the proposed control project can effectively suppress the disturbance caused by unbalanced loads and maintain the load voltage balance. The project is easy to be achieved and remarkably improves the quality of the independent power supply system.

  3. A decision framework to enhance sustainable groundwater management

    USDA-ARS?s Scientific Manuscript database

    Groundwater aquifers, which supply water for billions of the world’s inhabitants, are under stress due to increasing human population, water demand for economic development, and environmental constraints. Projected climate change increases uncertainty regarding sustainability of groundwater systems...

  4. 43 CFR 426.16 - Exemptions and exclusions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... announces availability of temporary supplies of water resulting from an unusually large water supply, not... water from a Corps project, Reclamation will exempt that land from specific provisions of Federal... control or conveyance of the agricultural water supply from the Corps project to that land. (2) Upon such...

  5. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.58 Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with...

  6. Solar project cost report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, H.J.

    1978-01-01

    This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less

  7. Policy implications of the GRI baseline projection of US energy supply and demand to 2010, 1993

    NASA Astrophysics Data System (ADS)

    1993-01-01

    The paper summarizes the 1993 edition of the Gas Research Institute (GRI) Baseline Projection of U.S. Energy Supply and Demand and presents the implications of the projections that are important for GRI research and development planning and the gas industry. The survey of supply and demand considerations is followed by a breakdown of energy demand by type of fuel, by consumption sector, and by service application. Gas supply and prices are analyzed in terms of two scenarios: a constrained energy demand scenario, and an optimistic scenario. Tables and charts accompany the summary.

  8. Data storage technology: Hardware and software, Appendix B

    NASA Technical Reports Server (NTRS)

    Sable, J. D.

    1972-01-01

    This project involves the development of more economical ways of integrating and interfacing new storage devices and data processing programs into a computer system. It involves developing interface standards and a software/hardware architecture which will make it possible to develop machine independent devices and programs. These will interface with the machine dependent operating systems of particular computers. The development project will not be to develop the software which would ordinarily be the responsibility of the manufacturer to supply, but to develop the standards with which that software is expected to confirm in providing an interface with the user or storage system.

  9. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-04-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completedmore » and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed.« less

  10. Evaluation and Selection of Predicaments in Pharmaceutical Supply Chain using AHP under Fuzzy Environment

    NASA Astrophysics Data System (ADS)

    Nikhil, E. V. S.; Sai Ram, V.; Charan Yadav, V.; Kiran Kumar, Kalla; Nagaraju, Dega

    2017-05-01

    Pharmaceutical sector plays an important role in the medical and health system. Due to the globalization of the business, increasing demand and supply for drugs, growing regulatory requirements, all stages of the pharmaceutical supply chain (SC) are facing numerous predicaments. The traditional way of selection and evaluation of these predicaments is customarily done using technical information. This approach lacks the ability to project the burning issue that to be addressed first. Hence, a computing method of selecting the crucial issue from the existing issues is essential in a pharmaceutical supply chain. This paper considers seven different predicaments as criteria and five sub-criteria under each main predicament of a pharmaceutical supply chain. The intention of this project is to manifest the process of assessing and selecting the issue that to be addressed first by using multi-criteria decision making technique (MCDM), i.e., fuzzy analytical hierarchy process (FAHP). The criteria and sub-criteria weights are calculated and priority assessment of the predicaments is done by using FAHP. Finally, from the findings of this work, the predicaments are ranked from most important to least important. This gives information to the decision maker (DM) to solve the issue that is affecting the SC the most with respect to the others.

  11. 76 FR 33361 - Notice of Availability of the Final Environmental Impact Statement for the Madera Irrigation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... Impact Statement for the Madera Irrigation District Water Supply Enhancement Project located in Madera... Madera Irrigation District Water Supply Enhancement Project (MID WSEP). Reclamation proposes to approve... supply reliability and flexibility for current and future water demand, and reduce local overdraft, MID...

  12. 38 CFR 21.212 - General policy in furnishing supplies during periods of rehabilitation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... placed at a distinct disadvantage in pursuing the course. (e) Supplies for special projects and theses. The amount of supplies that VA may authorize for special projects, including theses, may not exceed the amount generally needed by similarly circumstanced nonveterans in meeting course or thesis...

  13. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water... description of project alternatives that may be considered in the investigation, including: (1) Water supply...

  14. 75 FR 3460 - Indian River Power Supply, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 12462-020] Indian River Power Supply, LLC; Notice of Availability of Environmental Assessment January 13, 2010. In accordance..., Massachusetts. In the application, Indian River Power Supply, LLC (exemptee) proposes to replace the project's...

  15. Extreme hydrological changes in the southwestern US drive reductions in water supply to Southern California by mid century

    NASA Astrophysics Data System (ADS)

    Pagán, Brianna R.; Ashfaq, Moetasim; Rastogi, Deeksha; Kendall, Donald R.; Kao, Shih-Chieh; Naz, Bibi S.; Mei, Rui; Pal, Jeremy S.

    2016-09-01

    The Southwestern United States has a greater vulnerability to climate change impacts on water security due to a reliance on snowmelt driven imported water. The State of California, which is the most populous and agriculturally productive in the United States, depends on an extensive artificial water storage and conveyance system primarily for irrigated agriculture, municipal and industrial supply and hydropower generation. Here we take an integrative high-resolution ensemble modeling approach to examine near term climate change impacts on all imported and local sources of water supply to Southern California. While annual precipitation is projected to remain the same or slightly increase, rising temperatures result in a shift towards more rainfall, reduced cold season snowpack and earlier snowmelt. Associated with these hydrological changes are substantial increases in the frequency and the intensity of both drier conditions and flooding events. The 50 year extreme daily maximum precipitation and runoff events are 1.5-6 times more likely to occur depending on the water supply basin. Simultaneously, a clear deficit in total annual runoff over mountainous snow generating regions like the Sierra Nevada is projected. On one hand, the greater probability of drought decreases imported water supply availability. On the other hand, earlier snowmelt and significantly stronger winter precipitation events pose increased flood risk requiring water releases from control reservoirs, which may potentially decrease water availability outside of the wet season. Lack of timely local water resource expansion coupled with projected climate changes and population increases may leave the area in extended periods of shortages.

  16. Collaborative decision-making on wind power projects based on AHP method

    NASA Astrophysics Data System (ADS)

    Badea, A.; Proştean, G.; Tămăşilă, M.; Vârtosu, A.

    2017-01-01

    The complexity of projects implementation in Renewable Energy Sources (RES) requires finding collaborative alliances between suppliers and project developers in RES. Links activities in supply chain in RES, respectively, transportation of heavy components, processing orders to purchase quality raw materials, storage and materials handling, packaging, and other complex activities requiring a logistics system collaboratively to be permanently dimensioned properly selected and monitored. Requirements imposed by stringency of wind power energy projects implementation inevitably involves constraints in infrastructure, implementation and logistics. Thus, following an extensive research in RES project, to eliminate these constraints were identified alternative collaboration to provide feasible solutions on different levels of performance. The paper presents a critical analysis of different collaboration alternatives in supply chain for RES projects, selecting the ones most suitable for particular situations by using decision-making method Analytic Hierarchy Process (AHP). The role of AHP method was to formulate a decision model by which can be establish the collaboration alternative choice through mathematical calculation to reduce the impact created by constraints encountered. The solution provided through AHP provides a framework for detecting optimal alternative collaboration between suppliers and project developers in RES and avoids some breaks in the chain by resizing safety buffers for leveling orders in RES projects.

  17. Mission Benefits Analysis of Logistics Reduction Technologies

    NASA Technical Reports Server (NTRS)

    Ewert, Michael K.; Broyan, James L.

    2012-01-01

    Future space exploration missions will need to use less logistical supplies if humans are to live for longer periods away from our home planet. Anything that can be done to reduce initial mass and volume of supplies or reuse or recycle items that have been launched will be very valuable. Reuse and recycling also reduce the trash burden and associated nuisances, such as smell, but require good systems engineering and operations integration to reap the greatest benefits. A systems analysis was conducted to quantify the mass and volume savings of four different technologies currently under development by NASA fs Advanced Exploration Systems (AES) Logistics Reduction and Repurposing project. Advanced clothing systems lead to savings by direct mass reduction and increased wear duration. Reuse of logistical items, such as packaging, for a second purpose allows fewer items to be launched. A device known as a heat melt compactor drastically reduces the volume of trash, recovers water and produces a stable tile that can be used instead of launching additional radiation protection. The fourth technology, called trash ]to ]supply ]gas, can benefit a mission by supplying fuel such as methane to the propulsion system. This systems engineering work will help improve logistics planning and overall mission architectures by determining the most effective use, and reuse, of all resources.

  18. Adaptation of water resource systems to an uncertain future

    NASA Astrophysics Data System (ADS)

    Walsh, C. L.; Blenkinsop, S.; Fowler, H. J.; Burton, A.; Dawson, R. J.; Glenis, V.; Manning, L. J.; Kilsby, C. G.

    2015-09-01

    Globally, water resources management faces significant challenges from changing climate and growing populations. At local scales, the information provided by climate models is insufficient to support the water sector in making future adaptation decisions. Furthermore, projections of change in local water resources are wrought with uncertainties surrounding natural variability, future greenhouse gas emissions, model structure, population growth and water consumption habits. To analyse the magnitude of these uncertainties, and their implications for local scale water resource planning, we present a top-down approach for testing climate change adaptation options using probabilistic climate scenarios and demand projections. An integrated modelling framework is developed which implements a new, gridded spatial weather generator, coupled with a rainfall-runoff model and water resource management simulation model. We use this to provide projections of the number of days, and associated uncertainty that will require implementation of demand saving measures such as hose pipe bans and drought orders. Results, which are demonstrated for the Thames basin, UK, indicate existing water supplies are sensitive to a changing climate and an increasing population, and that the frequency of severe demand saving measures are projected to increase. Considering both climate projections and population growth the median number of drought order occurrences may increase five-fold. The effectiveness of a range of demand management and supply options have been tested and shown to provide significant benefits in terms of reducing the number of demand saving days. We found that increased supply arising from various adaptation options may compensate for increasingly variable flows; however, without reductions in overall demand for water resources such options will be insufficient on their own to adapt to uncertainties in the projected changes in climate and population. For example, a 30 % reduction in overall demand by 2050 has a greater impact on reducing the frequency of drought orders than any of the individual or combinations of supply options; hence a portfolio of measures are required.

  19. Analysis of trends in the development of cities' heat supply systems

    NASA Astrophysics Data System (ADS)

    Stennikov, V. A.; Mednikova, E. E.

    2016-09-01

    New challenges—including the modern urban development policy, formation of the market of energy efficient technologies and different types of equipment of a broad power capacity range, tightening requirements to reliability, quality, and economic accessibility of heat supply—enhance the competitiveness of decentralized heat supply. In addition, its spontaneous growth and not always reasonable implementation lead to unjustified expenses, low efficiency, and ecological inconsistency. This proves the relevance of solving the problems of dividing an urban territory into zones of centralized heating (CH) and decentralized heating (DCH) along with their planning and justification, as well as determining a reasonable level of heat supply centralization and concentration of heat sources' power capacity. Solving these problems using the suggested method will allow optimizing the application areas for various types of heat supply and heat sources, justifying the degree of heat power capacity concentration and the extent of the systems as early as at the phase of a detailed urban planning project and then refining them during the design of urban heat supply systems. This will dramatically improve the reasonability of the decisions made and will simplify the procedure of their implementation. For criteria of limiting the extent (radius) of heat supply systems and defining their type, we suggest using standard values—the density of heat load per unit length of the pipeline and per unit area of urban territory. Standard values must be differentiated across the territory of Russia taking into account regional climatic and economic conditions and unique characteristics of heat supply development in cities and towns. The present article continues and develops the statements made in the previous articles created within the framework of the Theory of Hydraulic Circuits and takes into account the current situation and emerging trends in heat supply.

  20. Risk assessment and adaptive runoff utilization in water resource system considering the complex relationship among water supply, electricity generation and environment

    NASA Astrophysics Data System (ADS)

    Zhou, J.; Zeng, X.; Mo, L.; Chen, L.; Jiang, Z.; Feng, Z.; Yuan, L.; He, Z.

    2017-12-01

    Generally, the adaptive utilization and regulation of runoff in the source region of China's southwest rivers is classified as a typical multi-objective collaborative optimization problem. There are grim competitions and incidence relation in the subsystems of water supply, electricity generation and environment, which leads to a series of complex problems represented by hydrological process variation, blocked electricity output and water environment risk. Mathematically, the difficulties of multi-objective collaborative optimization focus on the description of reciprocal relationships and the establishment of evolving model of adaptive systems. Thus, based on the theory of complex systems science, this project tries to carry out the research from the following aspects: the changing trend of coupled water resource, the covariant factor and driving mechanism, the dynamic evolution law of mutual feedback dynamic process in the supply-generation-environment coupled system, the environmental response and influence mechanism of coupled mutual feedback water resource system, the relationship between leading risk factor and multiple risk based on evolutionary stability and dynamic balance, the transfer mechanism of multiple risk response with the variation of the leading risk factor, the multidimensional coupled feedback system of multiple risk assessment index system and optimized decision theory. Based on the above-mentioned research results, the dynamic method balancing the efficiency of multiple objectives in the coupled feedback system and optimized regulation model of water resources is proposed, and the adaptive scheduling mode considering the internal characteristics and external response of coupled mutual feedback system of water resource is established. In this way, the project can make a contribution to the optimal scheduling theory and methodology of water resource management under uncertainty in the source region of Southwest River.

  1. 1995 Pacific Northwest Loads and Resources Study.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1995-12-01

    The study establishes the planning basis for supplying electricity to customers. The study presents projections of regional and Federal system load and resource capabilities, and serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts.

  2. Research on Current Water Systems and Regulatory Support

    EPA Science Inventory

    This project will supply research results to support federal regulations and guidance. It will also provide strategies to regions, states, and communities for improved regulatory compliance and rapid and effective emergency response where appropriate (e.g. harmful algal bloom out...

  3. The micronutrient genomics project: a community-driven knowledge base for micronutrient research

    USDA-ARS?s Scientific Manuscript database

    Micronutrients influence multiple metabolic pathways including oxidative and inflammatory processes. Optimum micronutrient supply is important for the maintenance of homeostasis in metabolism and, ultimately, for maintaining good health. With advances in systems biology and genomics technologies, it...

  4. Renewable energy - Target for 2050

    NASA Astrophysics Data System (ADS)

    Rowe, W. D.

    1982-02-01

    The possibilities of various renewable energy technologies to supply a projected world demand for 40,000 GW years of energy each year by the year 2050 are examined. Noting that industrial processes consume 50% of all energy needs, fossil fuel reserves are shown to be sufficient for a maximum of 370 yr in the U.S., when all supplies become depleted. Breeder reactors have a doubling time which is 30 yr too long for meeting more than 0.5% of world energy demand in 2050, while fusion, even considering ocean-derived deuterium as a fuel source, will not be supplying energy for another 35-70 yr. Among the solar technologies, the installation of ten million 100 m tall 4 MW wind generators is feasible to meet all the projected energy needs, and solar cells with 10% conversion efficiency could do the same with 14 times less land. Further discussion is given to geothermal, fuel cell, and OTEC technologies, as well as the forty trillion dollars necessary to erect the fully renewable systems.

  5. Automatic Ammunition Identification Technology Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weil, B.

    1993-01-01

    The Automatic Ammunition Identification Technology (AAIT) Project is an activity of the Robotics Process Systems Division at the Oak Ridge National Laboratory (ORNL) for the US Army's Project Manager-Ammunition Logistics (PM-AMMOLOG) at the Picatinny Arsenal in Picatinny, New Jersey. The project objective is to evaluate new two-dimensional bar code symbologies for potential use in ammunition logistics systems and automated reloading equipment. These new symbologies are a significant improvement over typical linear bar codes since machine-readable alphanumeric messages up to 2000 characters long are achievable. These compressed data symbologies are expected to significantly improve logistics and inventory management tasks and permitmore » automated feeding and handling of ammunition to weapon systems. The results will be increased throughout capability, better inventory control, reduction of human error, lower operation and support costs, and a more timely re-supply of various weapon systems. This paper will describe the capabilities of existing compressed data symbologies and the symbol testing activities being conducted at ORNL for the AAIT Project.« less

  6. Automatic Ammunition Identification Technology Project. Ammunition Logistics Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weil, B.

    1993-03-01

    The Automatic Ammunition Identification Technology (AAIT) Project is an activity of the Robotics & Process Systems Division at the Oak Ridge National Laboratory (ORNL) for the US Army`s Project Manager-Ammunition Logistics (PM-AMMOLOG) at the Picatinny Arsenal in Picatinny, New Jersey. The project objective is to evaluate new two-dimensional bar code symbologies for potential use in ammunition logistics systems and automated reloading equipment. These new symbologies are a significant improvement over typical linear bar codes since machine-readable alphanumeric messages up to 2000 characters long are achievable. These compressed data symbologies are expected to significantly improve logistics and inventory management tasks andmore » permit automated feeding and handling of ammunition to weapon systems. The results will be increased throughout capability, better inventory control, reduction of human error, lower operation and support costs, and a more timely re-supply of various weapon systems. This paper will describe the capabilities of existing compressed data symbologies and the symbol testing activities being conducted at ORNL for the AAIT Project.« less

  7. Impact of climate change on persistent turbidity in the water supply system of a Metropolitan Area

    NASA Astrophysics Data System (ADS)

    Chung, S. W.; Park, H. S.; Lim, K. J.; Kang, B.

    2016-12-01

    Persistent turbidity, a long-term resuspension of fine particles in aquatic system, is one of the major water quality concerns for the sustainable management of water supply systems in metropolitan areas. Turbid water has undesirable aesthetic and recreational appeal and may have harmful effect on ecosystem health, in addition to increasing water treatment costs in drinking water supply systems. These concerns have been more intensified as the strength and frequency of rainfall events increase by climate change in the Asian monsoon climate region, including Korea. The aim of this study was to assess the impact of potential climate change on the persistent turbidity of the Han River systems that supplies drinking water to approximately 25 million consumers dwelling in the Seoul Metropolitan areas. A comprehensive numerical and statistical modeling suit has been developed and applied to the systems for the projection of future climate, responding hydrological and soil erosion processes in the watershed, and sediment transport processes in the rivers and reservoirs systems. The down-scaled 100 years of climatic data from General Circulation Model (HadGEM2-AO) based on the IPCC's greenhouse-gas emissions scenario RCP4.5 were used for the forcing data of the watershed and river-reservoir models. As the results, an extreme flood event that may incur significant persistent turbidity was projected to be occurred five times in the future. The threshold of a flood event that is classified as an extreme event was based on the historical flood event that occurred on July of 2006 when turbid water had persisted within the Soyang Reservoir and discharged to the downstream of the Han River systems over the year until May of the following year. A two-dimensional river and reservoir model simulated the transport and dynamics of suspended sediments in Soyang Reservoir, and routed the discharged turbid water to the downstream of Paldang Reservoir, in which most of the drinking water offtake facilities are located. The statistical features of the extreme flood events, their impact on the persistent turbidity on the downstream rivers and reservoirs, and consequently on the water supply system of the Seoul Metropolitan areas will be presented in the special session.

  8. Region and database management for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Data Integration 2000 Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf product solution with commercially proven business processes. The COTS product solution set, of PassPort and People Soft software, supports finance, supply and chemical management/Material Safety Data Sheet, human resources.

  9. Engineers Without Borders Australia--lessons learned from an innovative approach to the upgrade of water supply infrastructure in Tenganan, Indonesia.

    PubMed

    Third, K; Fun, O M; Bowen, J; Micenko, A; Grey, V; Prohasky, T

    2009-01-01

    The community of Tenganan in eastern Bali, Indonesia, has requested technical assistance from Engineers Without Borders Australia (EWB) to improve the quantity and quality of water delivered through their water supply system. This is a unique development project in which the Tenganan people have identified their own needs and developed their own conceptual solution to the problem. For the first time, EWB is undertaking the design phase for the water system by an off-shore design team and project assistance team (PAT) based in Australia. This allows EWB to draw on resources and experience of EWB members and their employing companies in Australia. It also enables young engineers to develop skills and experience in development work without having to leave the country. However, the innovative approach also presented significant challenges to the project members, particularly in establishing appropriate design criteria and the co-ordination of simultaneous activities across Australia. This paper describes the approach taken by EWB and makes a preliminary assessment of the benefits and limitations inherent in this approach. The overall aim of the project is to produce a successful "bottom-up" development action that will deliver a sustainable solution to the Tenganan community.

  10. Tax reform, population ageing and the changing labour supply behaviour of married women.

    PubMed

    Apps, P

    1991-01-01

    "The burden of financing retirement incomes in an ageing population is predicted to rise sharply in future decades. This paper investigates the effects of reforms to the Australian tax-benefit system involving a greater reliance on proportional taxation for raising revenue and a more targeted welfare system for cutting government expenditure, in order to reduce expected budget deficits. Estimates of changes in net incomes and hours of work suggest that reforms of this kind shift the tax burden to lower and middle income households with a second earner and that they can have counter-productive labour supply effects. The study explores the impact of projected increases in female work force participation and illustrates the importance of shifts in the labour supply of married women in predicting the fiscal effects of demographic change." excerpt

  11. Exploring current and projected tradeoffs between hydropower profitability and reliability of supply in the Alps

    NASA Astrophysics Data System (ADS)

    Anghileri, D.; Castelletti, A.; Burlando, P.

    2015-12-01

    The recent spreading of renewable energy across Europe and the associated production variability and uncertainty are emerging challenges for hydropower system operation. Widely distributed and highly intermittent solar and wind power generation systems, along with feed-in-tariffs, at which they are remunerated, are threating the operation of traditional hydropower systems. For instance, in countries where the transition to a larger production by means of renewable power systems is a novel process, e.g. Switzerland, many hydropower companies are operating their reservoirs with low or no profits, claiming for a revision of the entire energy market system. This situation goes along with the problem of ensuring energy supply both nowadays and in the future, with changing energy demand and available water resources. In this work, we focus on a hydropower system in the Swiss Alps to explore how different operating policies can cope with both adequate energy supply and profitable operation under current and future climate and socio-economic conditions. We investigate the operation of the Mattmark reservoir in South-West Switzerland. Mattmark is a pumped reservoir of 98 106 m3 fed by a natural catchment of 37 km2 and contributing catchments, summing up to 51 km2, connected by several diversion channels. The hydrological regime, snow- and ice-melt dominated, has already experienced changes in the last decades due to glacier retreat and is expected to be strongly impacted by climate change in the future. We use Multi-Objective optimization techniques to explore current tradeoffs between profitability and secure supply. We then investigate how tradeoffs may evolve in time under different climate change projections and energy market scenarios. Results inform on the co-evolution of climate- and socio-economic induced variations, thus unveiling potential co-benefit situations to hydropower generation and providing insights to future energy market design.

  12. Two projections of timber supply in the Pacific coast states.

    Treesearch

    Donald R. Gedney; Daniel D. Oswald; Roger D. Fight

    1975-01-01

    Two projections of softwood timber supply for 1970-2020 for California, western Oregon, eastern Oregon, western Washington, eastern Washington, and coastal Alaska are presented. One projection shows how much timber will likely be available in the future if forest management continues at recent levels. The second projection shows the impact of one program of intensified...

  13. 43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...

  14. Occupational Supply and Demand in the State of Washington: Phase II Report.

    ERIC Educational Resources Information Center

    Sommers, Paul; Heg, Deena

    Occupational supply and demand in Washington State was examined by comparing projected supplies of skilled workers coming out of the state's community and technical colleges against the projected demand among Washington employers for people qualified to enter particular occupations. The analysis was based on a January 2000 report, information…

  15. The 113 GHz ECRH system for JET

    NASA Astrophysics Data System (ADS)

    Verhoeven, A. G. A.; Bongers, W. A.; Elzendoorn, B. S. Q.; Graswinckel, M.; Hellingman, P.; Kamp, J. J.; Kooijman, W.; Kruijt, O. G.; Maagdenberg, J.; Ronden, D.; Stakenborg, J.; Sterk, A. B.; Tichler, J.; Alberti, S.; Goodman, T.; Henderson, M.; Hoekzema, J. A.; Oosterbeek, J. W.; Fernandez, A.; Likin, K.; Bruschi, A.; Cirant, S.; Novak, S.; Piosczyk, B.; Thumm, M.; Bindslev, H.; Kaye, A.; Fleming, C.; Zohm, H.

    2003-02-01

    An ECRH (Electron Cyclotron Resonance Heating) system has been designed for JET in the framework of the JET Enhanced-Performance project (JET-EP) under the European Fusion Development Agreement (EFDA). Due to financial constraints it has recently been decided not to implement this project. Nevertheless, the design work conducted from April 2000 to January 2002 shows a number of features that can be relevant in preparation of future ECRH systems, e.g., for ITER. The ECRH system was foreseen to comprise 6 gyrotrons, 1 MW each, in order to deliver 5 MW into the plasma [1]. The main aim was to enable the control of neo-classical tearing modes (NTM). The paper will concentrate on: • The power-supply and modulation system, including series IGBT switches, to enable independent control of each gyrotron and an all-solid-state body power supply to stabilise the gyrotron output power and to enable fast modulations up to 10 kHz. • A plug-in launcher, that is steerable in both toroidal and poloidal angle, and able to handle 8 separate mm-wave beams. Four steerable launching mirrors were foreseen to handle two mm-wave beams each. Water cooling of all the mirrors was a particularly ITER relevant feature.

  16. FINAL TECHNICAL REPORT FOR FORESTRY BIOFUEL STATEWIDE COLLABORATION CENTER (MICHIGAN)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaCourt, Donna M.; Miller, Raymond O.; Shonnard, David R.

    A team composed of scientists from Michigan State University (MSU) and Michigan Technological University (MTU) assembled to better understand, document, and improve systems for using forest-based biomass feedstocks in the production of energy products within Michigan. Work was funded by a grant (DE-EE-0000280) from the U.S. Department of Energy (DOE) and was administered by the Michigan Economic Development Corporation (MEDC). The goal of the project was to improve the forest feedstock supply infrastructure to sustainably provide woody biomass for biofuel production in Michigan over the long-term. Work was divided into four broad areas with associated objectives: • TASK A: Developmore » a Forest-Based Biomass Assessment for Michigan – Define forest-based feedstock inventory, availability, and the potential of forest-based feedstock to support state and federal renewable energy goals while maintaining current uses. • TASK B: Improve Harvesting, Processing and Transportation Systems – Identify and develop cost, energy, and carbon efficient harvesting, processing and transportation systems. • TASK C: Improve Forest Feedstock Productivity and Sustainability – Identify and develop sustainable feedstock production systems through the establishment and monitoring of a statewide network of field trials in forests and energy plantations. • TASK D: Engage Stakeholders – Increase understanding of forest biomass production systems for biofuels by a broad range of stakeholders. The goal and objectives of this research and development project were fulfilled with key model deliverables including: 1) The Forest Biomass Inventory System (Sub-task A1) of feedstock inventory and availability and, 2) The Supply Chain Model (Sub-task B2). Both models are vital to Michigan’s forest biomass industry and support forecasting delivered cost, as well as carbon and energy balance. All of these elements are important to facilitate investor, operational and policy decisions. All other sub-tasks supported the development of these two tools either directly or by building out supporting information in the forest biomass supply chain. Outreach efforts have, and are continuing to get these user friendly models and information to decision makers to support biomass feedstock supply chain decisions across the areas of biomass inventory and availability, procurement, harvest, forwarding, transportation and processing. Outreach will continue on the project website at http://www.michiganforestbiofuels.org/ and http://www.michiganwoodbiofuels.org/« less

  17. Capacity of the US food system to accommodate improved diet quality: A biophysical model projecting to 2030

    USDA-ARS?s Scientific Manuscript database

    Background: Increasing Americans’ diet quality will require changes to the food supply. Due to the complex nature of the food system, this is not as straightforward as simply increasing the production of healthy foods and decreasing the production of unhealthy foods. Little is known about whether th...

  18. An Exploratory Study of Distinguishing Challenges Faced by Mid-Life Teacher Candidates

    ERIC Educational Resources Information Center

    Tanksley, James F.

    2012-01-01

    The United States public education system is facing a possible shortage of several hundred thousand teachers over the next decade. To overcome the projected shortfall in teacher supply, schools of education of state university and college systems may need to look to the fastest growing segment of the college student population, the non-traditional…

  19. Systems Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graham, R.L.

    1998-03-17

    The Systems Studies Activity had two objectives: (1) to investigate nontechnical barriers to the deployment of biomass production and supply systems and (2) to enhance and extend existing systems models of bioenergy supply and use. For the first objective, the Activity focused on existing bioenergy markets. Four projects were undertaken: a comparative analysis of bioenergy in Sweden and Austria; a one-day workshop on nontechnical barriers jointly supported by the Production Systems Activity; the development and testing of a framework for analyzing barriers and drivers to bioenergy markets; and surveys of wood pellet users in Sweden, Austria and the US. Formore » the second objective, two projects were undertaken. First, the Activity worked with the Integrated BioEnergy Systems (TBS) Activity of TEA Bioenergy Task XIII to enhance the BioEnergy Assessment Model (BEAM). This model is documented in the final report of the IBS Activity. The Systems Studies Activity contributed to enhancing the feedstock portion of the model by developing a coherent set of willow, poplar, and switchgrass production modules relevant to both the US and the UK. The Activity also developed a pretreatment module for switchgrass. Second, the Activity sponsored a three-day workshop on modeling bioenergy systems with the objectives of providing an overview of the types of models used to evaluate bioenergy and promoting communication among bioenergy modelers. There were nine guest speakers addressing different types of models used to evaluate different aspects of bioenergy, ranging from technoeconomic models based on the ASPEN software to linear programming models to develop feedstock supply curves for the US. The papers from this workshop have been submitted to Biomass and Bioenergy and are under editorial review.« less

  20. Surface based factory for the production of life support and technology support products

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The presence of a manned space colony on Mars may be expected to involve three phases in the utilization of planetary resources: (1) survival phase in which air, water, and food are produced, (2) self sufficiency phase in which chemicals, fuels, pharmaceuticals, polymers, and metals are produced, and (3) export to earth of materials and technology 1 phase in which the unique advantage of the extraterrestrial environment is fully exploited. The Advanced Design Project is administered as an interdisciplinary effort involving students and faculty throughout the College of Engineering. Senior students from Chemical, Civil, Electrical, and Mechanical Engineering are participating as a team. Multi discipline interfacing and coordination are stressed throughout the project. An interdisciplinary senior design course was developed and offered in the Spring of 1987. The first task of the survival phase is that of providing a supply of water and air adequate to support a ten person colony. The project has been divided into three subgroups: (1) design of a manufacturing and storage facility for air, (2) search and drill for water or water-bearing materials, and (3) retrieve, purify, and store potable water. The conceptual design phase has been completed and the project is being documented. The second task of the survival phase is that of providing a replenish able food supply. This task has two requirements: producing a supply of protein and providing an environment for growing plants for food. For the first requirement, we considered the design of a bioreactor system capable of growing beef cells for protein production. For the second, a design must be developed for a manufacturing system to produce materials needed to build a greenhouse farm.

  1. Systems Book for a Student Information System. End of Project Report, 1968-1971, Volume II.

    ERIC Educational Resources Information Center

    Western Nevada Regional Education Center, Lovelock.

    The necessary handbooks for use of the Student Information System (SIS), developed and tested by the Western Nevada Regional Education Center under a 1968-71 Title III (Elementary and Secondary Education Act) grant, are presented in this volume. As noted, the purpose of the SIS is to supply data and information to persons or organizations who make…

  2. Jordan Water Project: an interdisciplinary evaluation of freshwater vulnerability and security

    NASA Astrophysics Data System (ADS)

    Gorelick, S.; Yoon, J.; Rajsekhar, D.; Muller, M. F.; Zhang, H.; Gawel, E.; Klauer, B.; Klassert, C. J. A.; Sigel, K.; Thilmant, A.; Avisse, N.; Lachaut, T.; Harou, J. J.; Knox, S.; Selby, P. D.; Mustafa, D.; Talozi, S.; Haddad, Y.; Shamekh, M.

    2016-12-01

    The Jordan Water Project, part of the Belmont Forum projects, is an interdisciplinary, international research effort focused on evaluation of freshwater security in Jordan, one of the most water-vulnerable countries in the world. The team covers hydrology, water resources systems analysis, economics, policy evaluation, geography, risk and remote sensing analyses, and model platform development. The entire project team communally engaged in construction of an integrated hydroeconomic model for water supply policy evaluation. To represent water demand and allocation behavior at multiple levels of decision making,the model integrates biophysical modules that simulate natural and engineered hydrologic phenomena with human behavioral modules. Hydrologic modules include spatially-distributed groundwater and surface-water models for the major aquifers and watersheds throughout Jordan. For the human modules, we adopt a multi-agent modeling approach to represent decision-making processes. The integrated model was developed in Pynsim, a new open-source, object-oriented platform in Python for network-based water resource systems. We continue to explore the impacts of future scenarios and interventions.This project had tremendous encouragement and data support from Jordan's Ministry of Water and Irrigation. Modeling technology is being transferred through a companion NSF/USAID PEER project awarded toJordan University of Science and Technology. Individual teams have also conducted a range of studies aimed at evaluating Jordanian and transboundary surface water and groundwater systems. Surveys, interviews, and econometric analyses enabled us to better understandthe behavior of urban households, farmers, private water resellers, water use pattern of the commercial sector and irrigation water user associations. We analyzed nationwide spatial and temporal statistical trends in rainfall, developed urban and national comparative metrics to quantify water supply vulnerability, improved remote sensing methods to estimate crop-water use, and evaluated the impacts of climate change on future drought severity.

  3. Evaluation of Ensemble Water Supply and Demands Forecasts for Water Management in the Klamath River Basin

    NASA Astrophysics Data System (ADS)

    Broman, D.; Gangopadhyay, S.; McGuire, M.; Wood, A.; Leady, Z.; Tansey, M. K.; Nelson, K.; Dahm, K.

    2017-12-01

    The Upper Klamath River Basin in south central Oregon and north central California is home to the Klamath Irrigation Project, which is operated by the Bureau of Reclamation and provides water to around 200,000 acres of agricultural lands. The project is managed in consideration of not only water deliveries to irrigators, but also wildlife refuge water demands, biological opinion requirements for Endangered Species Act (ESA) listed fish, and Tribal Trust responsibilities. Climate change has the potential to impact water management in terms of volume and timing of water and the ability to meet multiple objectives. Current operations use a spreadsheet-based decision support tool, with water supply forecasts from the National Resources Conservation Service (NRCS) and California-Nevada River Forecast Center (CNRFC). This tool is currently limited in its ability to incorporate in ensemble forecasts, which offer the potential for improved operations by quantifying forecast uncertainty. To address these limitations, this study has worked to develop a RiverWare based water resource systems model, flexible enough to use across multiple decision time-scales, from short-term operations out to long-range planning. Systems model development has been accompanied by operational system development to handle data management and multiple modeling components. Using a set of ensemble hindcasts, this study seeks to answer several questions: A) Do a new set of ensemble streamflow forecasts have additional skill beyond what?, and allow for improved decision making under changing conditions? B) Do net irrigation water requirement forecasts developed in this project to quantify agricultural demands and reservoir evaporation forecasts provide additional benefits to decision making beyond water supply forecasts? C) What benefit do ensemble forecasts have in the context of water management decisions?

  4. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Project Review Under Section 3.8 of the...

  5. 76 FR 43994 - Termination of the Environmental Impact Statement (EIS) for the Proposed Regional Watershed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Water Act permit application for the proposed `Regional Watershed Supply Project' submitted in 2008 by a... to supply up to 250,000 acre feet of water annually to various municipal and agricultural entities in... the EIS process started in 2009, it was understood that the project purpose was water supply, so all...

  6. 77 FR 62224 - Notice of Intent To Revise Scope of Draft Environmental Impact Statement for Updating the Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Industrial Water Supply From the Buford Dam/Lake Lanier Project AGENCY: Department of the Army, U.S. Army... accommodate municipal and industrial water supply from the Buford Dam/Lake Lanier project. The Corps is... also consider, along with operations for all authorized purposes, an expanded range of water supply...

  7. 43 CFR 404.13 - What criteria will Reclamation use to prioritize requests for assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... urgent and compelling need for a rural water supply project that would: (1) Address present or future water supply needs; or (2) Promote public health and safety by addressing present and preventing future violations of drinking water standards; (b) The extent to which a rural water supply project promotes and...

  8. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments on the proposed water supply pipeline and the draft EIS. Additionally, as discussed below, we will be...

  9. Projected Supply, Demand, and Shortages of Registered Nurses, 2000-2020.

    ERIC Educational Resources Information Center

    Health Resources and Services Administration (DHHS/PHS), Rockville, MD. National Center for Health Workforce Analysis.

    The supply, demand, and shortages of registered nurses (RNs) were projected and analyzed for 2000-2020. According to the analysis, the national supply of full-time-equivalent registered nurses in 2000 was estimated at 1.89 million versus an estimated demand of 2 million, leaving a shortage of 110,000 (6%). The shortage is expected to grow…

  10. Modeling grain size adjustments in the downstream reach following run-of-river development

    NASA Astrophysics Data System (ADS)

    Fuller, Theodore K.; Venditti, Jeremy G.; Nelson, Peter A.; Palen, Wendy J.

    2016-04-01

    Disruptions to sediment supply continuity caused by run-of-river (RoR) hydropower development have the potential to cause downstream changes in surface sediment grain size which can influence the productivity of salmon habitat. The most common approach to understanding the impacts of RoR hydropower is to study channel changes in the years following project development, but by then, any impacts are manifest and difficult to reverse. Here we use a more proactive approach, focused on predicting impacts in the project planning stage. We use a one-dimensional morphodynamic model to test the hypothesis that the greatest risk of geomorphic change and impact to salmon habitat from a temporary sediment supply disruption exists where predevelopment sediment supply is high and project design creates substantial sediment storage volume. We focus on the potential impacts in the reach downstream of a powerhouse for a range of development scenarios that are typical of projects developed in the Pacific Northwest and British Columbia. Results indicate that increases in the median bed surface size (D50) are minor if development occurs on low sediment supply streams (<1 mm for supply rates 1 × 10-5 m2 s-1 or lower), and substantial for development on high sediment supply streams (8-30 mm for supply rates between 5.5 × 10-4 and 1 × 10-3 m2 s-1). However, high sediment supply streams recover rapidly to the predevelopment surface D50 (˜1 year) if sediment supply can be reestablished.

  11. Power Management and Distribution Trades Studies for a Deep-Space Mission Scientific Spacecraft

    NASA Technical Reports Server (NTRS)

    Kimnach, Greg L.; Soltis, James V.

    2004-01-01

    As part of NASA's Project Prometheus, the Nuclear Systems Program, NASA GRC performed trade studies on the various Power Management and Distribution (PMAD) options for a deep-space scientific spacecraft which would have a nominal electrical power requirement of 100 kWe. These options included AC (1000Hz and 1500Hz and DC primary distribution at various voltages. The distribution system efficiency, reliability, mass, thermal, corona, space radiation levels and technology readiness of devices and components were considered. The final proposed system consisted of two independent power distribution channels, sourced by two 3-phase, 110 kVA alternators nominally operating at half-rated power. Each alternator nominally supplies 50kWe to one half of the ion thrusters and science modules but is capable of supplying the total power re3quirements in the event of loss of one alternator. This paper is an introduction to the methodology for the trades done to arrive at the proposed PMAD architecture. Any opinions expressed are those of the author(s) and do not necessarily reflect the views of Project Prometheus.

  12. Preliminary conceptual design for geothermal space heating conversion of school district 50 joint facilities at Pagosa Springs, Colorado. GTA report no. 6

    NASA Astrophysics Data System (ADS)

    Engen, I. A.

    1981-11-01

    This feasibility study and preliminary conceptual design effect assesses the conversion of a high school and gym, and a middle school building to geothermal space heating is assessed. A preliminary cost benefit assessment made on the basis of estimated costs for conversion, system maintenance, debt service, resource development, electricity to power pumps, and savings from from reduced natural gas consumption concluded that an economic conversion depended on development of an adequate geothermal resource (approximately 1500F, 400 gpm). Material selection assumed that the geothermal water to the main supply system was isolated to minimize effects of corrosion and deposition, and that system compatible components are used for the building modifications. Asbestos cement distribution pipe, a stainless steel heat exchanger, and stainless steel lined valves were recommended for the supply, heat transfer, and disposal mechanisms, respectively. A comparison of the calculated average gas consumption cost, escalated at 10% per year, with conversion project cost, both in 1977 dollars, showed that the project could be amortized over less than 20 years at current interest rates.

  13. Power Management and Distribution Trades Studies for a Deep-space Mission Scientific Spacecraft

    NASA Astrophysics Data System (ADS)

    Kimnach, Greg L.; Soltis, James V.

    2004-02-01

    As part of NASA's Project Prometheus, the Nuclear Systems Program, NASA GRC performed trade studies on the various Power Management and Distribution (PMAD) options for a deep-space scientific spacecraft, which would have a nominal electrical power requirement of 100 kWe. These options included AC (1000Hz and 1500Hz) and DC primary distribution at various voltages. The distribution system efficiency, reliability, mass, thermal, corona, space radiation levels, and technology readiness of devices and components were considered. The final proposed system consisted of two independent power distribution channels, sourced by two 3-phase, 110 kVA alternators nominally operating at half-rated power. Each alternator nominally supplies 50 kWe to one-half of the ion thrusters and science modules, but is capable of supplying the total power requirements in the event of loss of one alternator. This paper is an introduction to the methodology for the trades done to arrive at the proposed PMAD architecture. Any opinions expressed are those of the author(s) and do not necessarily reflect the views of Project Prometheus.

  14. A supply model for nurse workforce projection in Malaysia.

    PubMed

    Abas, Zuraida Abal; Ramli, Mohamad Raziff; Desa, Mohamad Ishak; Saleh, Nordin; Hanafiah, Ainul Nadziha; Aziz, Nuraini; Abidin, Zaheera Zainal; Shibghatullah, Abdul Samad; Rahman, Ahmad Fadzli Nizam Abdul; Musa, Haslinda

    2017-08-18

    The paper aims to provide an insight into the significance of having a simulation model to forecast the supply of registered nurses for health workforce planning policy using System Dynamics. A model is highly in demand to predict the workforce demand for nurses in the future, which it supports for complete development of a needs-based nurse workforce projection using Malaysia as a case study. The supply model consists of three sub-models to forecast the number of registered nurses for the next 15 years: training model, population model and Full Time Equivalent (FTE) model. In fact, the training model is for predicting the number of newly registered nurses after training is completed. Furthermore, the population model is for indicating the number of registered nurses in the nation and the FTE model is useful for counting the number of registered nurses with direct patient care. Each model is described in detail with the logical connection and mathematical governing equation for accurate forecasting. The supply model is validated using error analysis approach in terms of the root mean square percent error and the Theil inequality statistics, which is mportant for evaluating the simulation results. Moreover, the output of simulation results provides a useful insight for policy makers as a what-if analysis is conducted. Some recommendations are proposed in order to deal with the nursing deficit. It must be noted that the results from the simulation model will be used for the next stage of the Needs-Based Nurse Workforce projection project. The impact of this study is that it provides the ability for greater planning and policy making with better predictions.

  15. Risk-based water resources planning: Incorporating probabilistic nonstationary climate uncertainties

    NASA Astrophysics Data System (ADS)

    Borgomeo, Edoardo; Hall, Jim W.; Fung, Fai; Watts, Glenn; Colquhoun, Keith; Lambert, Chris

    2014-08-01

    We present a risk-based approach for incorporating nonstationary probabilistic climate projections into long-term water resources planning. The proposed methodology uses nonstationary synthetic time series of future climates obtained via a stochastic weather generator based on the UK Climate Projections (UKCP09) to construct a probability distribution of the frequency of water shortages in the future. The UKCP09 projections extend well beyond the range of current hydrological variability, providing the basis for testing the robustness of water resources management plans to future climate-related uncertainties. The nonstationary nature of the projections combined with the stochastic simulation approach allows for extensive sampling of climatic variability conditioned on climate model outputs. The probability of exceeding planned frequencies of water shortages of varying severity (defined as Levels of Service for the water supply utility company) is used as a risk metric for water resources planning. Different sources of uncertainty, including demand-side uncertainties, are considered simultaneously and their impact on the risk metric is evaluated. Supply-side and demand-side management strategies can be compared based on how cost-effective they are at reducing risks to acceptable levels. A case study based on a water supply system in London (UK) is presented to illustrate the methodology. Results indicate an increase in the probability of exceeding the planned Levels of Service across the planning horizon. Under a 1% per annum population growth scenario, the probability of exceeding the planned Levels of Service is as high as 0.5 by 2040. The case study also illustrates how a combination of supply and demand management options may be required to reduce the risk of water shortages.

  16. Potential effects of drought on carrying capacity for wintering waterfowl in the Central Valley of California

    USGS Publications Warehouse

    Petrie, Mark J.; Fleskes, Joseph P.; Wolder, Mike A.; Isola, Craig R.; Yarris, Gregory S.; Skalos, Daniel A.

    2016-01-01

    We used the bioenergetics model TRUEMET to evaluate potential effects of California's recent drought on food supplies for waterfowl wintering in the Central Valley under a range of habitat and waterfowl population scenarios. In nondrought years in the current Central Valley landscape, food supplies are projected to be adequate for waterfowl from fall through early spring (except late March) even if waterfowl populations reach North American Waterfowl Management Plan goals. However, in all drought scenarios that we evaluated, food supplies were projected to be exhausted for ducks by mid- to late winter and by late winter or early spring for geese. For ducks, these results were strongly related to projected declines in winter-flooded rice fields that provide 45% of all the food energy available to ducks in the Central Valley in nondrought water years. Delayed flooding of some managed wetlands may help alleviate food shortages by providing wetland food resources better timed with waterfowl migration and abundance patterns in the Central Valley, as well as reducing the amount of water needed to manage these habitats. However, future research is needed to evaluate the impacts of delayed flooding on waterfowl hunting, and whether California's existing water delivery system would make delayed flooding feasible. Securing adequate water supplies for waterfowl and other wetland-dependent birds is among the greatest challenges facing resource managers in coming years, especially in the increasingly arid western United States.

  17. Meals for the Elderly

    NASA Technical Reports Server (NTRS)

    1977-01-01

    NASA is drawing upon its food-preparation expertise to assist in solving a problem affecting a large segment of the American population. In preparation for manned space flight programs, NASA became experienced in providing astronauts simple, easily-prepared, nutritious meals. That experience now is being transferred to the public sector in a cooperative project managed by Johnson Space Center. Called Meal System for the Elderly, the project seeks to fill a gap by supplying nutritionally balanced meal packages to those who are unable to participate in existing meal programs. Many such programs are conducted by federal, state and private organizations, including congregate hot meal services and home-delivered "meals on wheels." But more than 3.5 million elderly Americans are unable to take advantage of these benefits. In some cases, they live in rural areas away from available services; in others, they are handicapped, temporarily ill, or homebound for other reasons. Meal System for the Elderly, a cooperative program in which the food-preparation expertise NASA acquired in manned space projects is being utilized to improve the nutritional status of elderly people. The program seeks to fill a gap by supplying nutritionally-balanced food packages to the elderly who are unable to participate b existing meal service programs.

  18. Data management plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.

  19. The NBS Energy Model Assessment project: Summary and overview

    NASA Astrophysics Data System (ADS)

    Gass, S. I.; Hoffman, K. L.; Jackson, R. H. F.; Joel, L. S.; Saunders, P. B.

    1980-09-01

    The activities and technical reports for the project are summarized. The reports cover: assessment of the documentation of Midterm Oil and Gas Supply Modeling System; analysis of the model methodology characteristics of the input and other supporting data; statistical procedures undergirding construction of the model and sensitivity of the outputs to variations in input, as well as guidelines and recommendations for the role of these in model building and developing procedures for their evaluation.

  20. Total Water Management: A Research Project of the United States Environmental Protection Agency

    EPA Science Inventory

    Total Water Management (TWM) examines urban water systems in an interconnected manner. It encompasses reducing water demands, increasing water recycling and reuse, creating water supply assets from stormwater management, matching water quality to end-use needs, and achieving envi...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martel, Laura; Smith, Paul; Rizea, Steven

    The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energymore » Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawaii and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the predicted economies of scale as technology and efficiency improvements are realized and larger more economical plants deployed. Utilizing global high resolution OTEC resource assessment from the Ocean Thermal Extractable Energy Visualization (OTEEV) project (an independent DOE project), Global Energy Supply Curves were generated for Grid Connected and Energy Carrier OTEC plants deployed in 2045 when the predicted technology and efficiencies improvements are fully realized. The Global Energy Supply Curves present the LCOE versus capacity in ascending order with the richest, lowest cost resource locations being harvested first. These curves demonstrate the vast ocean thermal resource and potential OTEC capacity that can be harvested with little change in LCOE.« less

  2. Cascaded Microinverter PV System for Reduced Cost

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellus, Daniel R.; Ely, Jeffrey A.

    2013-04-29

    In this project, a team led by Delphi will develop and demonstrate a novel cascaded photovoltaic (PV) inverter architecture using advanced components. This approach will reduce the cost and improve the performance of medium and large-sized PV systems. The overall project objective is to develop, build, and test a modular 11-level cascaded three-phase inverter building block for photovoltaic applications and to develop and analyze the associated commercialization plan. The system will be designed to utilize photovoltaic panels and will supply power to the electric grid at 208 VAC, 60 Hz 3-phase. With the proposed topology, three inverters, each with anmore » embedded controller, will monitor and control each of the cascade sections, reducing costs associated with extra control boards. This report details the final disposition on this project.« less

  3. Five-city economics of a solar hot-water-system

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report projects energy savings and system costs for five sites using analysis of actual solar energy installation performance in Togus, Maine. Maine system supplies 75 percent of hot water needed for single-family residence; economic payback period is 19 years. Benefits for all sites depend on maintenance or decrease of initial investment required and continuing increase in cost of conventional energy. Report includes analysis weighing potential changes in variables used to evaluate system profitability.

  4. Manned orbital systems concepts study. Book 3: Configurations for extended duration missions. [mission planning and project planning for space missions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.

  5. Requirement analysis for the one-stop logistics management of fresh agricultural products

    NASA Astrophysics Data System (ADS)

    Li, Jun; Gao, Hongmei; Liu, Yuchuan

    2017-08-01

    Issues and concerns for food safety, agro-processing, and the environmental and ecological impact of food production have been attracted many research interests. Traceability and logistics management of fresh agricultural products is faced with the technological challenges including food product label and identification, activity/process characterization, information systems for the supply chain, i.e., from farm to table. Application of one-stop logistics service focuses on the whole supply chain process integration for fresh agricultural products is studied. A collaborative research project for the supply and logistics of fresh agricultural products in Tianjin was performed. Requirement analysis for the one-stop logistics management information system is studied. The model-driven business transformation, an approach uses formal models to explicitly define the structure and behavior of a business, is applied for the review and analysis process. Specific requirements for the logistic management solutions are proposed. Development of this research is crucial for the solution of one-stop logistics management information system integration platform for fresh agricultural products.

  6. Using a Content Management System for Integrated Water Quantity, Quality and Instream Flows Modeling

    NASA Astrophysics Data System (ADS)

    Burgholzer, R.; Brogan, C. O.; Scott, D.; Keys, T.

    2017-12-01

    With increased population and water demand, in-stream flows can become depleted by consumptive uses and dilution of permitted discharges may be compromised. Reduced flows downstream of water withdrawals may increase the violation rate of bacterial concentrations from direct deposition by livestock and wildlife. Water storage reservoirs are constructed and operated to insure more stable supplies for consumptive demands and dilution flows, however their use comes at the cost of increased evaporative losses, potential for thermal pollution, interrupted fish migration, and reduced flooding events that are critical to maintain habitat and water quality. Due to this complex interrelationship between water quantity, quality and instream habitat comprehensive multi-disciplinary models must be developed to insure long-term sustainability of water resources and to avoid conflicts between drinking water, food and energy production, and aquatic biota. The Commonwealth of Virginia funded the expansion of the Chesapeake Bay Program Phase 5 model to cover the entire state, and has been using this model to evaluate water supply permit and planning since 2009. This integrated modeling system combines a content management system (Drupal and PHP) for model input data and leverages the modularity of HSPF with the custom segmentation and parameterization routines programmed by modelers working with the Chesapeake Bay Program. The model has been applied to over 30 Virginia Water Permits, instream flows and aquatic habitat models and a Virginias 30 year water supply demand projections. Future versions will leverage the Bay Model auto-calibration routines for adding small-scale water supply and TMDL models, utilize climate change scenarios, and integrate Virginia's reservoir management modules into the Chesapeake Bay watershed model, feeding projected demand and operational changes back up to EPA models to improve the realism of future Bay-wide simulations.

  7. China Report, Economic Affairs, No. 353

    DTIC Science & Technology

    1983-06-20

    INDUSTRY Introduction to Key Projects Throughout Country (Fei Qiangj XINHUA Domestic Service, 27 May 83) 20 Small Tractors Supply in Rural Areas...reforming the commodity circulation system and the industrial management system at the country level, successfully carrying out readjustment in...must vigorously expand economic activitieswith foreign countries . 5. We must strictly observe discipline. 6. We must do well in structural reform

  8. Affecting the value chain through supplier kaizen.

    PubMed

    Forman, C R; Vargas, D H

    1999-02-01

    In the aerospace industry, typically 60 percent of a product's cost and 70 percent of the lead time are due to purchased material. To affect price and customer responsiveness, improvement initiatives must be extended into the supply chain. Many companies have developed supply base management systems that include long-term agreements with suppliers, partnering with suppliers in risk taking and product design, information sharing, and quality and delivery rating systems. The premise is that suppliers are an extension of the factory. But to take full advantage of customer-supplier relationships, the suppliers must be "developed" in the same manner as a manufacturing unit. Supplier kaizen is a method of bringing suppliers to the same level of operations as the parent company, through training and improvement projects, to ensure superior performance and nurture the trust that is required for strong partnerships. This article describes Sikorsky Aircraft's use of kaizen to improve its supply base management.

  9. Climate Narratives: Combing multiple sources of information to develop risk management strategies for a municipal water utility

    NASA Astrophysics Data System (ADS)

    Yates, D. N.; Basdekas, L.; Rajagopalan, B.; Stewart, N.

    2013-12-01

    Municipal water utilities often develop Integrated Water Resource Plans (IWRP), with the goal of providing a reliable, sustainable water supply to customers in a cost-effective manner. Colorado Springs Utilities, a 5-service provider (potable and waste water, solid waste, natural gas and electricity) in Colorado USA, recently undertook an IWRP. where they incorporated water supply, water demand, water quality, infrastructure reliability, environmental protection, and other measures within the context of complex water rights, such as their critically important 'exchange potential'. The IWRP noted that an uncertain climate was one of the greatest sources of uncertainty to achieving a sustainable water supply to a growing community of users. We describe how historic drought, paleo-climate, and climate change projections were blended together into climate narratives that informed a suite of water resource systems models used by the utility to explore the vulnerabilities of their water systems.

  10. World Energy Projection System Plus Model Documentation: Commercial Module

    EIA Publications

    2016-01-01

    The Commercial Model of the World Energy Projection System Plus (WEPS ) is an energy demand modeling system of the world commercial end?use sector at a regional level. This report describes the version of the Commercial Model that was used to produce the commercial sector projections published in the International Energy Outlook 2016 (IEO2016). The Commercial Model is one of 13 components of the WEPS system. The WEPS is a modular system, consisting of a number of separate energy models that are communicate and work with each other through an integrated system model. The model components are each developed independently, but are designed with well?defined protocols for system communication and interactivity. The WEPS modeling system uses a shared database (the “restart” file) that allows all the models to communicate with each other when they are run in sequence over a number of iterations. The overall WEPS system uses an iterative solution technique that forces convergence of consumption and supply pressures to solve for an equilibrium price.

  11. Massachusetts Study of Teacher Supply and Demand: Trends and Projections

    ERIC Educational Resources Information Center

    Levin, Jesse; Berg-Jacobson, Alex; Atchison, Drew; Lee, Katelyn; Vontsolos, Emily

    2015-01-01

    In April 2015, the Massachusetts Department of Elementary and Secondary Education (ESE) commissioned American Institutes for Research (AIR) to develop a comprehensive set of 10-year projections of teacher supply and demand in order to inform planning for future workforce needs. This included state-level projections both in the aggregate, as well…

  12. The NASA Human Space Flight Supply Chain, Current and Future

    NASA Technical Reports Server (NTRS)

    Zapata, Edgar

    2007-01-01

    The current NASA Human Space Flight transportation system, the Space Shuttle, is scheduled for final flight in 2010. The Exploration initiative will create a new capability with a combination of existing systems and new flight and ground elements. To fully understand and act on the implications of such change it is necessary to understand what, how, when and where such changes occur and more importantly, how all these interact. This paper presents Human Space Flight, with an emphasis on KSC Launch and Landing, as a Supply Chain of both information and materials. A supply chain methodology for understanding the flow of information and materials is presented. Further, modeling and simulation projects funded by the Exploration initiative to understand the NASA Exploration Supply Chain are explained. Key concepts and their purpose, including the Enterprise, Locations, Physical and Organizational Functional Units, Products, and Resources, are explained. It is shown that the art, science and perspective of Supply Chain Management is not only applicable to such a government & contractor operation, it is also an invaluable approach for understanding, focusing improvement and growth. It is shown that such commercial practice applies to Human Space Flight and is invaluable towards one day creating routine, affordable access to and from space.

  13. Gas-fired power in the UK: Bridging supply gaps and implications of domestic shale gas exploitation for UK climate change targets.

    PubMed

    Turk, Jeremy K; Reay, David S; Haszeldine, R Stuart

    2018-03-01

    There is a projected shortcoming in the fourth carbon budget of 7.5%. This shortfall may be increased if the UK pursues a domestic shale gas industry to offset projected decreases in traditional gas supply. Here we estimate that, if the project domestic gas supply gap for power generation were to be met by UK shale gas with low fugitive emissions (0.08%), an additional 20.4MtCO 2 e 1 would need to be accommodated during carbon budget periods 3-6. We find that a modest fugitive emissions rate (1%) for UK shale gas would increase global emissions compared to importing an equal quantity of Qatari liquefied natural gas. Additionally, we estimate that natural gas electricity generation would emit 420-466MtCO 2 e (460 central estimate) during the same time period within the traded EU emissions cap. We conclude that domestic shale gas production with even a modest 1% fugitive emissions rate would risk exceedance of UK carbon budgets. We also highlight that, under the current production-based greenhouse gas accounting system, the UK is incentivized to import natural gas rather than produce it domestically. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. NASA presentation. [wind energy conversion systems planning

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.

    1973-01-01

    The development of a wind energy system is outlined that supplies reliable energy at a cost competitive with other energy systems. A government directed industry program with strong university support is recommended that includes meteorological studies to estimate wind energy potentials and determines favorable regions and sites for wind power installations. Key phases of the overall program are wind energy conversion systems, meteorological wind studies, energy storage systems, and environmental impact studies. Performance testing with a prototype wind energy conversion and storage system is projected for Fiscal 1977.

  15. Climate change adaptation in regulated water utilities

    NASA Astrophysics Data System (ADS)

    Vicuna, S.; Melo, O.; Harou, J. J.; Characklis, G. W.; Ricalde, I.

    2017-12-01

    Concern about climate change impacts on water supply systems has grown in recent years. However, there are still few examples of pro-active interventions (e.g. infrastructure investment or policy changes) meant to address plausible future changes. Deep uncertainty associated with climate impacts, future demands, and regulatory constraints might explain why utility planning in a range of contexts doesn't explicitly consider climate change scenarios and potential adaptive responses. Given the importance of water supplies for economic development and the cost and longevity of many water infrastructure investments, large urban water supply systems could suffer from lack of pro-active climate change adaptation. Water utilities need to balance the potential for high regret stranded assets on the one side, with insufficient supplies leading to potentially severe socio-economic, political and environmental failures on the other, and need to deal with a range of interests and constraints. This work presents initial findings from a project looking at how cities in Chile, the US and the UK are developing regulatory frameworks that incorporate utility planning under uncertainty. Considering for example the city of Santiago, Chile, recent studies have shown that although high scarcity cost scenarios are plausible, pre-emptive investment to guard from possible water supply failures is still remote and not accommodated by current planning practice. A first goal of the project is to compare and contrast regulatory approaches to utility risks considering climate change adaptation measures. Subsequently we plan to develop and propose a custom approach for the city of Santiago based on lessons learned from other contexts. The methodological approach combines institutional assessment of water supply regulatory frameworks with simulation-based decision-making under uncertainty approaches. Here we present initial work comparing the regulatory frameworks in Chile, UK and USA evaluating their ability to incorporate uncertain climate and other changes into long-term infrastructure investment planning. The potential for regulatory and financial adaptive measures is explored in addition to a discussion on evaluating their appropriateness via various modelling-based intervention decision-making approaches.

  16. Fossil Energy Program

    NASA Astrophysics Data System (ADS)

    McNeese, L. E.

    1981-01-01

    Increased utilization of coal and other fossil fuel alternatives as sources of clean energy is reported. The following topics are discussed: coal conversion development, chemical research and development, materials technology, component development and process evaluation studies, technical support to major liquefaction projects, process analysis and engineering evaluations, fossil energy environmental analysis, flue gas desulfurization, solid waste disposal, coal preparation waste utilization, plant control development, atmospheric fluidized bed coal combustor for cogeneration, TVA FBC demonstration plant program technical support, PFBC systems analysis, fossil fuel applications assessments, performance assurance system support for fossil energy projects, international energy technology assessment, and general equilibrium models of liquid and gaseous fuel supplies.

  17. Annual Energy Outlook 2016 With Projections to 2040

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Annual Energy Outlook 2016 (AEO2016), prepared by the U.S. Energy Information Administration (EIA), presents long-term projections of energy supply, demand, and prices through 2040. The projections, focused on U.S. energy markets, are based on results from EIA’s National Energy Modeling System (NEMS). NEMS enables EIA to make projections under alternative, internallyconsistent sets of assumptions. The analysis in AEO2016 focuses on the Reference case and 17 alternative cases. EIA published an Early Release version of the AEO2016 Reference case (including U.S. Environmental Protection Agency’s (EPA) Clean Power Plan (CPP)) and a No CPP case (excluding the CPP) in May 2016.

  18. Biofuel Feedstock Assessment For Selected Countries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kline, Keith L; Oladosu, Gbadebo A; Wolfe, Amy K

    2008-02-01

    Findings from biofuel feedstock production assessments and projections of future supply are presented and discussed. The report aims to improve capabilities to assess the degree to which imported biofuel could contribute to meeting future U.S. targets to reduce dependence on imported oil. The study scope was focused to meet time and resource requirements. A screening process identified Argentina, Brazil, Canada, China, Colombia, India, Mexico, and the Caribbean Basin Initiative (CBI) region for initial analysis, given their likely role in future feedstock supply relevant to U.S. markets. Supply curves for selected feedstocks in these countries are projected for 2012, 2017 andmore » 2027. The supply functions, along with calculations to reflect estimated supplies available for export and/or biofuel production, were provided to DOE for use in a broader energy market allocation study. Potential cellulosic supplies from crop and forestry residues and perennials were also estimated for 2017 and 2027. The analysis identified capacity to potentially double or triple feedstock production by 2017 in some cases. A majority of supply growth is derived from increasing the area cultivated (especially sugarcane in Brazil). This is supplemented by improving yields and farming practices. Most future supplies of corn and wheat are projected to be allocated to food and feed. Larger shares of future supplies of sugarcane, soybean and palm oil production will be available for export or biofuel. National policies are catalyzing investments in biofuel industries to meet targets for fuel blending that generally fall in the 5-10% range. Social and environmental concerns associated with rapid expansion of feedstock production are considered. If the 2017 projected feedstock supply calculated as 'available' for export or biofuel were converted to fuel, it would represent the equivalent of about 38 billion gallons of gasoline. Sugarcane and bagasse dominate the available supply, representing 64% of the total. Among the nations studied, Brazil is the source of about two-thirds of available supplies, followed distantly by Argentina (12%), India and the CBI region.« less

  19. Biofuel Feedstock Assessment for Selected Countries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kline, K.L.; Oladosu, G.A.; Wolfe, A.K.

    2008-02-18

    Findings from biofuel feedstock production assessments and projections of future supply are presented and discussed. The report aims to improve capabilities to assess the degree to which imported biofuel could contribute to meeting future U.S. targets to reduce dependence on imported oil. The study scope was focused to meet time and resource requirements. A screening process identified Argentina, Brazil, Canada, China, Colombia, India, Mexico, and the Caribbean Basin Initiative (CBI) region for initial analysis, given their likely role in future feedstock supply relevant to U.S. markets. Supply curves for selected feedstocks in these countries are projected for 2012, 2017 andmore » 2027. The supply functions, along with calculations to reflect estimated supplies available for export and/or biofuel production, were provided to DOE for use in a broader energy market allocation study. Potential cellulosic supplies from crop and forestry residues and perennials were also estimated for 2017 and 2027. The analysis identified capacity to potentially double or triple feedstock production by 2017 in some cases. A majority of supply growth is derived from increasing the area cultivated (especially sugarcane in Brazil). This is supplemented by improving yields and farming practices. Most future supplies of corn and wheat are projected to be allocated to food and feed. Larger shares of future supplies of sugarcane, soybean and palm oil production will be available for export or biofuel. National policies are catalyzing investments in biofuel industries to meet targets for fuel blending that generally fall in the 5-10% range. Social and environmental concerns associated with rapid expansion of feedstock production are considered. If the 2017 projected feedstock supply calculated as ‘available’ for export or biofuel were converted to fuel, it would represent the equivalent of about 38 billion gallons of gasoline. Sugarcane and bagasse dominate the available supply, representing 64% of the total. Among the nations studied, Brazil is the source of about two-thirds of available supplies, followed distantly by Argentina (12%), India and the CBI region.« less

  20. Estimating the ROI on Implementation of RFID at the Ammunition Storage Warehouse and the 40th Supply Depot: KVA as a Methodology

    DTIC Science & Technology

    2009-12-01

    Balanced Scorecard CAPM Capital Asset Pricing Model DIS Defense Information System DoD Department of...Measurement Tool (PMT) is the Balanced Scorecard (BSC) based on critical success factors and key performance indicators. The MND has referred to Jung’s...authors can replicate the methodology for multiple projects to generate a portfolio of projects. Similar to the Capital Asset Pricing Model ( CAPM ) or

  1. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are proposed projects under the Rural Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.51...

  2. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  3. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  4. Simulation of the effects of ground-water withdrawals and recharge on ground-water flow in Cape Cod, Martha's Vineyard, and Nantucket Island basins, Massachusetts

    USGS Publications Warehouse

    Masterson, John P.; Barlow, Paul M.

    1994-01-01

    The effects of changing patterns of ground-water pumping and aquifer recharge on the surface-water and ground-water hydrologic systems were determined for the Cape Cod, Martha's Vineyard, and Nantucket Island Basins. Three-dimensional, transient, ground-water-flow modelS that simulate both freshwater and saltwater flow were developed for the f1ow cells of Cape Cod which currently have large-capacity public-supply wells. Only the freshwater-flow system was simulated for the Cape Cod flow cells where public-water supply demands are satisfied by small-capacity domestic wells. Two- dimensional, finite-difference, change models were developed for Martha's Vineyard and Nantucket Island to determine the projected drawdowns in response to projected in-season pumping rates for 180 days of no aquifer recharge. Results of the simulations indicate very little change in the position of the freshwater-saltwater interface from predevelopment flow conditions to projected ground-water pumping and recharge rates for Cape Cod in the year 2020. Results of change model simulations for Martha's Vineyard and Nantucket Island indicate that the greatest impact in response to projected in-season ground-water pumping occurs at the pumping centers and the magnitude of the drawdowns are minimal with respect to the total thickness of the aquifers.

  5. One-way coupling of an integrated assessment model and a water resources model: evaluation and implications of future changes over the US Midwest

    NASA Astrophysics Data System (ADS)

    Voisin, N.; Liu, L.; Hejazi, M.; Tesfa, T.; Li, H.; Huang, M.; Liu, Y.; Leung, L. R.

    2013-11-01

    An integrated model is being developed to advance our understanding of the interactions between human activities, terrestrial system and water cycle, and to evaluate how system interactions will be affected by a changing climate at the regional scale. As a first step towards that goal, a global integrated assessment model, which includes a water-demand model driven by socioeconomics at regional and global scales, is coupled in a one-way fashion with a land surface hydrology-routing-water resources management model. To reconcile the scale differences between the models, a spatial and temporal disaggregation approach is developed to downscale the annual regional water demand simulations into a daily time step and subbasin representation. The model demonstrates reasonable ability to represent the historical flow regulation and water supply over the US Midwest (Missouri, Upper Mississippi, and Ohio river basins). Implications for future flow regulation, water supply, and supply deficit are investigated using climate change projections with the B1 and A2 emission scenarios, which affect both natural flow and water demand. Although natural flow is projected to increase under climate change in both the B1 and A2 scenarios, there is larger uncertainty in the changes of the regulated flow. Over the Ohio and Upper Mississippi river basins, changes in flow regulation are driven by the change in natural flow due to the limited storage capacity. However, both changes in flow and demand have effects on the Missouri River Basin summer regulated flow. Changes in demand are driven by socioeconomic factors, energy and food demands, global markets and prices with rainfed crop demand handled directly by the land surface modeling component. Even though most of the changes in supply deficit (unmet demand) and the actual supply (met demand) are driven primarily by the change in natural flow over the entire region, the integrated framework shows that supply deficit over the Missouri River Basin sees an increasing sensitivity to changes in demand in future periods. It further shows that the supply deficit is six times as sensitive as the actual supply to changes in flow and demand. A spatial analysis of the supply deficit demonstrates vulnerabilities of urban areas located along mainstream with limited storage.

  6. EBMUD Drought Planning Put to the Test in 2014

    NASA Astrophysics Data System (ADS)

    Bray, B. S.

    2014-12-01

    The East Bay Municipal Utility District faced challenges in the unprecedented 2014 drought managing limited supplies to reliably serve its customers. The District's successful drought planning required a multi-faceted plan to preserve a reliable water supply, now and into the future. Planning has included investments in recycled water projects, passive and active customer conservation programs, and pursuit of alternative water supply options. EBMUD's drought planning efforts have been tested in 2014 when California experienced one of the driest years on record and the 2nd driest year in the Mokelumne Watershed, the source of 90% of the District's water supply. This presentation will highlight the effectiveness of drought planning in three areas: (1) implementing 10% water conservation as of July 2014, (2) the securing of nearly 20TAF of supplemental water supply conveyed through the Freeport Regional Water Project, and (3) operating EBMUD's Mokelumne River Project to meet fishery flow and water quality objectives.

  7. A Universal Portable Appliance for Stellarator W7-X Power Supply Controlling

    NASA Astrophysics Data System (ADS)

    Xu, Wei-hua; Wolfgang, Foerster; Guenter, Mueller

    2001-06-01

    In the project Wendelstein 7-X (W7-X), the popular fieldbus Profibus has been determined as a uniform connection between the central control system and all the subordinate systems. A universal embedded control system has been developed for W7-X power supply controlling. Siemens 80C167CR microcontroller is used as the central control unit of the system. With a user-defined printed circuit board (PCB) several control buses, i.e., Profibus, CAN, IEEE 488, RS485 and RS 232 have been connected to the microcontroller. The corresponding hardware interfaces for the control buses have been designed. A graphic liquid crystal display(LCD) and a user-defined keyboard are used as user interface. The control software will be developed with a C-like language, i.e., C166 for the controller.

  8. General collaboration offer of Johnson Controls regarding the performance of air conditioning automatic control systems and other buildings` automatic control systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gniazdowski, J.

    1995-12-31

    JOHNSON CONTROLS manufactures measuring and control equipment (800 types) and is as well a {open_quotes}turn-key{close_quotes} supplier of complete automatic controls systems for heating, air conditioning, ventilation and refrigerating engineering branches. The Company also supplies Buildings` Computer-Based Supervision and Monitoring Systems that may be applied in both small and large structures. Since 1990 the company has been performing full-range trade and contracting activities on the Polish market. We have our own well-trained technical staff and we collaborate with a series of designing and contracting enterprises that enable us to have our projects carried out all over Poland. The prices of ourmore » supplies and services correspond with the level of the Polish market.« less

  9. Flash Foods' Job Creation and Petroleum Independence with E85

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walk, Steve

    Protec Fuel Management project objectives are to help design, build, provide, promote and supply biofuels for the greater energy independence, national security and domestic economic growth through job creations, infrastructure projects and supply chain business stimulants.

  10. Design and Implementation of Geothermal Energy Systems at West Chester University

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, James

    West Chester University has launched a comprehensive transformation of its campus heating and cooling systems from traditional fossil fuels to geothermal. This change will significantly decrease the institution's carbon footprint and serve as a national model for green campus efforts. The institution has designed a phased series of projects to build a district geo-exchange system with shared well fields, central pumping station and distribution piping to provide the geo-exchange water to campus buildings as their internal building HVAC systems are changed to be able to use the geo-exchange water. This project addresses the US Department of Energy Office of Energymore » Efficiency and Renewable Energy (EERE) goal to invest in clean energy technologies that strengthen the economy, protect the environment, and reduce dependence on foreign oil. In addition, this project advances EERE's efforts to establish geothermal energy as an economically competitive contributor to the US energy supply.« less

  11. Cross-sectoral optimization and visualization of transformation processes in urban water infrastructures in rural areas.

    PubMed

    Baron, S; Kaufmann Alves, I; Schmitt, T G; Schöffel, S; Schwank, J

    2015-01-01

    Predicted demographic, climatic and socio-economic changes will require adaptations of existing water supply and wastewater disposal systems. Especially in rural areas, these new challenges will affect the functionality of the present systems. This paper presents a joint interdisciplinary research project with the objective of developing an innovative software-based optimization and decision support system for the implementation of long-term transformations of existing infrastructures of water supply, wastewater and energy. The concept of the decision support and optimization tool is described and visualization methods for the presentation of results are illustrated. The model is tested in a rural case study region in the Southwest of Germany. A transformation strategy for a decentralized wastewater treatment concept and its visualization are presented for a model village.

  12. When technical achievements aren't enough: Lessons learned from efforts to catalyze policy action on supply chain in Senegal.

    PubMed

    Dicko, Modibo; Souare, Batouo; Sarr, Lamine Cisse; Gueye, Babacar

    2017-04-19

    Before 2013, Senegal public health supply system was pull-based and fully public-run. Lengthy and recurrent stockouts of essential health products (incl. contraceptives) were the rule, not the exception as they used to strike more than 80% of public service delivery points (SDPs). Following a successful pilot in two districts in 2012, the Senegalese Ministry of Health and Social Action (MSAS) implemented the Informed Push Model (IPM) Project (2013-2016). In its first two years, IPM bridged key gaps and expanded the distribution of contraceptives by private third party logistics operators to all public SDPs in Senegal and nearly eliminated stockouts. However, the MSAS was slow to take ownership of the project. Understanding the roots of this reluctance, executing a range of targeted communication and advocacy efforts and preparing a strong transition plan are succeeding to push Government toward full ownership to enable the National Supply Pharmacy to distribute all health products going to SDPs, including vaccines, consistently with their Strategic Plan 2014-2018. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  13. Implementation of a real option in a sustainable supply chain: an empirical study of alkaline battery recycling

    NASA Astrophysics Data System (ADS)

    Cucchiella, Federica; D'Adamo, Idiano; Gastaldi, Massimo; Lenny Koh, S. C.

    2014-06-01

    Green supply chain management (GSCM) has emerged as a key approach for enterprises seeking to become environmentally sustainable. This paper aims to evaluate and describe the advantages of a GSCM approach by analysing practices and performance consequences in the battery recycling sector. It seeks to integrate works in supply chain management (SCM), environmental management, performance management and real option (RO) theory into one framework. In particular, life cycle assessment (LCA) is applied to evaluate the environmental impact of a battery recycling plant project, and life cycle costing (LCC) is applied to evaluate its economic impact. Firms, also understanding the relevance of GSCM, have often avoided applying the green principles because of the elevated costs that such management involved. Such costs could also seem superior to the potential advantages since standard performance measurement systems are internally and business focused; for these reasons, we consider all the possible value deriving also by uncertainty associated to a green project using the RO theory. This work is one of the few and pioneering efforts to investigate GSCM practices in the battery recycling sector.

  14. Implementation of sensor and control designs for bioregenerative systems

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The EGM 4000/4001 Engineering Design class is an interdisciplinary design course that allows students to experience the design process. The projects involved the design of sensors and subsystems of a closed-loop life support system (CLLSS) with special emphasis on the Controlled Ecological Life Support System (CELSS) currently being developed at Kennedy Space Center (KSC) by NASA. To understand the work performed by the students, one must understand the purpose and concept of a CLLSS system. In the years to come, NASA will be constructing Moon bases and sending astronauts to other worlds on extended space missions. In order to support the crews, unreasonably large quantities of supplies would have to be sent from Earth. These supplies would be difficult to transport and require large holds. To remedy this problem, NASA plans to incorporate crops into the spacecraft. These crops would supply food for the crews, as well as provide beneficial psychological side effects. In addition, the plants would recycle the air and human waste and provide oxygen and water for the humans. The students in the design class were to work on supporting this project. In order to do this successfully, the course was separated into two phases. The first semester involved studying the various aspects of a CLLSS to determine sensing needs and develop ideas. The second semester involved first determining which of the ideas were most promising. Specific sensors were then designed and tested under laboratory conditions with promising results. Finally, recommendations for further development were proposed. Atmosphere and temperature control, nutrient delivery, plant health and propagation, and resource recycling are discussed.

  15. 41 CFR 109-28.5000 - Scope of subpart.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Scope of subpart. 109-28... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 28-STORAGE AND DISTRIBUTION 28.50-Management of Equipment Held for Future Projects § 109-28.5000 Scope of...

  16. 41 CFR 109-28.5000 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Scope of subpart. 109-28... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 28-STORAGE AND DISTRIBUTION 28.50-Management of Equipment Held for Future Projects § 109-28.5000 Scope of...

  17. 41 CFR 109-28.5000 - Scope of subpart.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Scope of subpart. 109-28... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 28-STORAGE AND DISTRIBUTION 28.50-Management of Equipment Held for Future Projects § 109-28.5000 Scope of...

  18. 41 CFR 109-28.5000 - Scope of subpart.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Scope of subpart. 109-28... Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 28-STORAGE AND DISTRIBUTION 28.50-Management of Equipment Held for Future Projects § 109-28.5000 Scope of...

  19. Information Retrieval by Television.

    ERIC Educational Resources Information Center

    Billowes, C. A.

    1968-01-01

    Bell Canada, the Public School and Collegiate Institute Boards of Ottawa, and the Ontario Institute for Studies in Education are collaborating on an educational television project which will provide a retrieval system that can supply any given program at any time under the control of the classroom teacher. Four schools in Ottawa will participate…

  20. NAHBE (Naval Academy Heat Balanced Engine) M151 Retrofit Evaluation

    DTIC Science & Technology

    1983-08-15

    ORGANIZATION NAME AND ADDRESS 10. PRGRAM ELEMENT PROJECT. TASK AREA I WORK UNIT NUMIIERS Sonex Research, Inc. 300 Chinquapin Round Road Annapolis, MD 21401...lower. 3. At wide open throttle (WOT) the pressure drop through the air delivery system prevented supplying sufficient secondary air to operate at

  1. LIQUID CHROMATOGRAPHY/MASS SPECTROMETRY LIBRARY AND STRATEGY FOR IDENTIFYING HARMFUL ORGANICS IN DRINKING WATER

    EPA Science Inventory

    This project will demonstrate ways to detect contaminants by LC/MS technologies in order to protect water systems and environments. Contaminants can affect drinking water usage and limit acceptable sources of ground and reservoir supplies. The analytical method to enhance the s...

  2. 7 CFR 3406.20 - Evaluation criteria for research proposals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... environment, state-of-the-art equipment, or supplies; enhance library collections related to the area of research; or enable the institution to provide efficacious organizational structures and reward systems to...) Innovation—Are significant aspects of the project based on an innovative or a non-traditional approach? Does...

  3. 40 CFR 160.43 - Test system care facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (1) In tests with plants or aquatic animals, proper separation of species can be accomplished within..., aquarium, or housing unit. (2) Aquatic toxicity tests for individual projects shall be isolated to the... protocol. (h) For plants, an adequate supply of soil of the appropriate composition, as specified in the...

  4. Impact of enhanced geothermal systems on US energy supply in the twenty-first century.

    PubMed

    Tester, Jefferson W; Anderson, Brian J; Batchelor, Anthony S; Blackwell, David D; DiPippo, Ronald; Drake, Elisabeth M; Garnish, John; Livesay, Bill; Moore, Michal C; Nichols, Kenneth; Petty, Susan; Toksoz, M Nafi; Veatch, Ralph W; Baria, Roy; Augustine, Chad; Murphy, Enda; Negraru, Petru; Richards, Maria

    2007-04-15

    Recent national focus on the value of increasing US supplies of indigenous renewable energy underscores the need for re-evaluating all alternatives, particularly those that are large and well distributed nationally. A panel was assembled in September 2005 to evaluate the technical and economic feasibility of geothermal becoming a major supplier of primary energy for US base-load generation capacity by 2050. Primary energy produced from both conventional hydrothermal and enhanced (or engineered) geothermal systems (EGS) was considered on a national scale. This paper summarizes the work of the panel which appears in complete form in a 2006 MIT report, 'The future of geothermal energy' parts 1 and 2. In the analysis, a comprehensive national assessment of US geothermal resources, evaluation of drilling and reservoir technologies and economic modelling was carried out. The methodologies employed to estimate geologic heat flow for a range of geothermal resources were utilized to provide detailed quantitative projections of the EGS resource base for the USA. Thirty years of field testing worldwide was evaluated to identify the remaining technology needs with respect to drilling and completing wells, stimulating EGS reservoirs and converting geothermal heat to electricity in surface power and energy recovery systems. Economic modelling was used to develop long-term projections of EGS in the USA for supplying electricity and thermal energy. Sensitivities to capital costs for drilling, stimulation and power plant construction, and financial factors, learning curve estimates, and uncertainties and risks were considered.

  5. Distribution and Room Air Mixing Risks to Retrofitted Homes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.

    2014-12-01

    An energy efficiency upgrade reduces a home’s heating and cooling load. If the load reduction is great enough and the heating, ventilation, and air conditioning system warrants replacement, that system is often upgraded with a more efficient, lower capacity system that meets the load of the upgraded house. For a single-story house with floor supply air diffusers, the ducts often are removed and upgraded. For houses with ducts that are embedded in walls, the cost of demolition precludes the replacement of ducts. The challenge with the use of existing ducts is that the reduced airflow creates a decreased throw atmore » the supply registers, and the supply air and room air do not mix well, leading to potential thermal comfort complaints. This project investigates this retrofit scenario. The issues and solutions discussed here are relevant to all climate zones, with emphasis on climates that require cooling. In this project, IBACOS performed load calculations for a two-story 1960s house and characterized duct sizes and layouts based on industry “rules of thumb” (Herk et al. 2014). The team performed duct-sizing calculations for unaltered ducts and post-retrofit airflows and examined airflow velocities and pressure changes with respect to various factors. The team then used a mocked-up duct and register setup to measure the characteristics of isothermal air—to reduce the effects of buoyancy from the observations—passing through the duct and leaving the register.« less

  6. Extreme hydrological changes in the southwestern US drive reductions in water supply to Southern California by mid century

    DOE PAGES

    Pagán, Brianna R.; Ashfaq, Moetasim; Rastogi, Deeksha; ...

    2016-09-21

    The Southwestern United States has a greater vulnerability to climate change impacts on water security due to a reliance on snowmelt driven imported water. The State of California, which is the most populous and agriculturally productive in the United States, depends on an extensive artificial water storage and conveyance system primarily for irrigated agriculture, municipal and industrial supply and hydropower generation. Here we take an integrative high-resolution ensemble approach to examine near term climate change impacts on all imported and local sources of water supply to Southern California. While annual precipitation is projected to remain the same or slightly increase,more » rising temperatures result in a shift in precipitation type towards more rainfall, reducing cold season snowpack and earlier snowmelt. Associated with these hydrological changes are substantial increases in both dry and flood event frequency and intensity. On one hand, the greater probability of drought decreases imported water supply availability. On the other hand, earlier snowmelt and significantly stronger winter precipitation events pose increased flood risk requiring water releases from reservoirs for flood control, also potentially decreasing water availability. As a result, lack of timely local water resource expansion coupled with climate change projections and population increases may leave the area in extended periods of shortages.« less

  7. Extreme hydrological changes in the southwestern US drive reductions in water supply to Southern California by mid century

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pagán, Brianna R.; Ashfaq, Moetasim; Rastogi, Deeksha

    The Southwestern United States has a greater vulnerability to climate change impacts on water security due to a reliance on snowmelt driven imported water. The State of California, which is the most populous and agriculturally productive in the United States, depends on an extensive artificial water storage and conveyance system primarily for irrigated agriculture, municipal and industrial supply and hydropower generation. Here we take an integrative high-resolution ensemble approach to examine near term climate change impacts on all imported and local sources of water supply to Southern California. While annual precipitation is projected to remain the same or slightly increase,more » rising temperatures result in a shift in precipitation type towards more rainfall, reducing cold season snowpack and earlier snowmelt. Associated with these hydrological changes are substantial increases in both dry and flood event frequency and intensity. On one hand, the greater probability of drought decreases imported water supply availability. On the other hand, earlier snowmelt and significantly stronger winter precipitation events pose increased flood risk requiring water releases from reservoirs for flood control, also potentially decreasing water availability. As a result, lack of timely local water resource expansion coupled with climate change projections and population increases may leave the area in extended periods of shortages.« less

  8. The Cortex project A quasi-real-time information system to build control systems for high energy physics experiments

    NASA Astrophysics Data System (ADS)

    Barillere, R.; Cabel, H.; Chan, B.; Goulas, I.; Le Goff, J. M.; Vinot, L.; Willmott, C.; Milcent, H.; Huuskonen, P.

    1994-12-01

    The Cortex control information system framework is being developed at CERN. It offers basic functions to allow the sharing of information, control and analysis functions; it presents a uniform human interface for such information and functions; it permits upgrades and additions without code modification and it is sufficiently generic to allow its use by most of the existing or future control systems at CERN. Services will include standard interfaces to user-supplied functions, analysis, archive and event management. Cortex does not attempt to carry out the direct data acquisition or control of the devices; these are activities which are highly specific to the application and are best done by commercial systems or user-written programs. Instead, Cortex integrates these application-specific pieces and supports them by supplying other commonly needed facilities such as collaboration, analysis, diagnosis and user assistance.

  9. Focused Logistics and Support for Force Projection in Force XXI and Beyond

    DTIC Science & Technology

    1999-12-09

    business system linking trading partners with point of sale demand and real time manufacturing for clothing items.17 Quick Response achieved $1.7...be able to determine the real - time status and supply requirements of units. With "distributed logistics system software model hosts൨ and active...location, quantity, condition, and movement of assets. The system is designed to be fully automated, operate in near- real time with an open-architecture

  10. Adaptation of water resource systems to an uncertain future

    NASA Astrophysics Data System (ADS)

    Walsh, Claire L.; Blenkinsop, Stephen; Fowler, Hayley J.; Burton, Aidan; Dawson, Richard J.; Glenis, Vassilis; Manning, Lucy J.; Jahanshahi, Golnaz; Kilsby, Chris G.

    2016-05-01

    Globally, water resources management faces significant challenges from changing climate and growing populations. At local scales, the information provided by climate models is insufficient to support the water sector in making future adaptation decisions. Furthermore, projections of change in local water resources are wrought with uncertainties surrounding natural variability, future greenhouse gas emissions, model structure, population growth, and water consumption habits. To analyse the magnitude of these uncertainties, and their implications for local-scale water resource planning, we present a top-down approach for testing climate change adaptation options using probabilistic climate scenarios and demand projections. An integrated modelling framework is developed which implements a new, gridded spatial weather generator, coupled with a rainfall-runoff model and water resource management simulation model. We use this to provide projections of the number of days and associated uncertainty that will require implementation of demand saving measures such as hose pipe bans and drought orders. Results, which are demonstrated for the Thames Basin, UK, indicate existing water supplies are sensitive to a changing climate and an increasing population, and that the frequency of severe demand saving measures are projected to increase. Considering both climate projections and population growth, the median number of drought order occurrences may increase 5-fold by the 2050s. The effectiveness of a range of demand management and supply options have been tested and shown to provide significant benefits in terms of reducing the number of demand saving days. A decrease in per capita demand of 3.75 % reduces the median frequency of drought order measures by 50 % by the 2020s. We found that increased supply arising from various adaptation options may compensate for increasingly variable flows; however, without reductions in overall demand for water resources such options will be insufficient on their own to adapt to uncertainties in the projected changes in climate and population. For example, a 30 % reduction in overall demand by 2050 has a greater impact on reducing the frequency of drought orders than any of the individual or combinations of supply options; hence, a portfolio of measures is required.

  11. First oxygenated gasoline season shakes out differently than expected

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale, C.; Hackworth, J.H.; Shore, J.M.

    1993-10-25

    The U.S.'s first oxygenated gasoline season began Nov. 1, 1992. Refiners and marketers achieved compliance with these new specs with little upset to the gasoline production and distribution system. But although the season went smoothly, it did not shake out exactly as projected. Demand for oxygenated gasoline and, in particular, methyl tertiary butyl ether (MTBE), was lower than expected. Prior to the season, refiners were concerned that oxygenates might be in short supply. No supply shortages developed, however, and prices of both oxygenates and gasoline decreased during the season. The paper discusses gasoline demand, administration of the oxygenated gasoline program,more » spillover, reduced demand, ethanol, oxygenate supply, prices, ethanol tax credit, refinery economics, and the outlook for next season.« less

  12. System Safety and the Coast Guard Lighter-Than-Air System Project.

    DTIC Science & Technology

    1983-12-01

    and daymarks, and numerous Loran and Omega stations which provide far- reaching continuous electronic navigation for ships and aircraft. 2. Enforcement...Coast Guard inspects bridges, issues permits to insure that marine needs are met, promulgates regulations for drawbridges , and supervises...research and development, personnel, civil rights, legal, engineering , fiscal and supply, health care, and intelligence/security programs. [Ref. 3: pp. 13

  13. U.S. Regional Aquifer Analysis Program

    NASA Astrophysics Data System (ADS)

    Johnson, Ivan

    As a result of the severe 1976-1978 drought, Congress in 1978 requested that the U.S. Geological Survey (USGS) initiate studies of the nation's aquifers on a regional scale. This continuing USGS project, the Regional Aquifer System Analysis (RASA) Program, consists of systematic studies of the quality and quantity of water in the regional groundwater systems that supply a large part of the nation's water.

  14. The Physical/Chemical Closed-Loop Life Support Research Project

    NASA Technical Reports Server (NTRS)

    Bilardo, Vincent J., Jr.

    1990-01-01

    The various elements of the Physical/Chemical Closed-Loop Life Support Research Project (P/C CLLS) are described including both those currently funded and those planned for implementation at ARC and other participating NASA field centers. The plan addresses the entire range of regenerative life support for Space Exploration Initiative mission needs, and focuses initially on achieving technology readiness for the Initial Lunar Outpost by 1995-97. Project elements include water reclamation, air revitalization, solid waste management, thermal and systems control, and systems integration. Current analysis estimates that each occupant of a space habitat will require a total of 32 kg/day of supplies to live and operate comfortably, while an ideal P/C CLLS system capable of 100 percent reclamation of air and water, but excluding recycling of solid wastes or foods, will reduce this requirement to 3.4 kg/day.

  15. Testing Omega P’s 650 KW, 1.3 GHZ Low-Voltage Multi-Beam Klystron for the Project X Pulsed LINAC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fermi Research Alliance; Omega-P Inc.

    Omega-P Inc. had developed a multi beam 1.3 GHz klystron (MBK) for the Project X pulsed linac application. Testing of the klystron require a special hardware such as a modulator, RF components, control system, power supplies, etc, as well as associated infrastructure( electricity, water, safety). This is an expensive part of klystron development for which Omega-P does not have the required equipment. Fermilab will test the MBK at Fermilab site providing contribution to the project all the necessary facilities, infrastructure and manpower for MBK test performance and analysis.

  16. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7...

  17. A National Energy-Water System Assessment Framework (NEWS): Synopsis of Stage 1 Research Strategy and Results

    NASA Astrophysics Data System (ADS)

    Vorosmarty, C. J.; Miara, A.; Macknick, J.; Newmark, R. L.; Cohen, S.; Sun, Y.; Tidwell, V. C.; Corsi, F.; Melillo, J. M.; Fekete, B. M.; Proussevitch, A. A.; Glidden, S.; Suh, S.

    2017-12-01

    The focus of this talk is on climate adaptation and the reliability of power supply infrastructure when viewed through the lens of strategic water issues. Power supply is critically dependent upon water resources, particularly to cool thermoelectric plants, making the sector particularly sensitive to any shifts in the geography or seasonality of water supply. We report on results from an NSF-Funded Water Sustainability and Climate effort aimed at uncovering key energy and economic system vulnerabilities. We have developed the National Energy-Water System assessment framework (NEWS) to systematically evaluate: a) the performance of the nation's electricity sector under multiple climate scenarios; b) the feasibility of alternative pathways to improve climate adaptation; and, c) the impacts of energy technology and investment tradeoffs on the economic productivity, water availability and aquatic ecosystem condition. Our project combines core engineering and geophysical models (ReEDS [Regional Energy Deployment System], TP2M [Thermoelectric Power and Thermal Pollution], and WBM [Water Balance]) through unique digital "handshake" protocols that operate across different institutions and modeling platforms. Combined system outputs are fed into a regional-to-national scale economic input/output model to evaluate economic consequences of climate constraints, technology choices, and environmental regulation. The impact assessments in NEWS are carried out through a series of climate/energy policy scenario studies to 2050. We find that despite significant climate-water impacts on individual plants, the current US power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. However, the magnitude and implications of climate-water impacts vary depending on the configuration of the future power sector. To evaluate future power supply performance, we model alternative electricity sector pathways in combination with varying climate-water conditions. Further, water-linked disruptions in electricity supply yield substantial impacts on regional economies yet system-level shocks can be attenuated through different technology mixes and infrastructure.

  18. Renewable energy water supply - Mexico program summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foster, R.

    1997-12-01

    This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importancemore » of training. It also presents much collected data as to the characteristics and performance of the installed systems.« less

  19. Adapted hydropower-driven water supply system: assessment of an underground application in an Indonesian karst area

    NASA Astrophysics Data System (ADS)

    Oberle, P.; Ikhwan, M.; Stoffel, D.; Nestmann, F.

    2016-09-01

    Populated karst landscapes can be found all over the world, although their natural boundary conditions mostly lead to distinct challenges regarding a sustainable water supply. Especially in developing and emerging countries, this situation aggravates since appropriate technologies and water management concepts are rarely available. Against this background, the interdisciplinary, German-Indonesian joint project " Integrated Water Resources Management (IWRM) Indonesia", funded by the German Federal Ministry of Education and Research (BMBF), focused on the development and exemplary implementation of adapted techniques to remedy the partly severe water scarcity in the region Gunung Sewu. This karst area, widely known as " Java's poorhouse", is located on the southern coast of Java Island and distinctly suffers from the mentioned constraints. Under the aegis of the Karlsruhe Institute of Technology (KIT), the conceptual and technical achievements of the "IWRM Indonesia" joint research project are characterized by a high potential for multiplication not only for karst areas but also for non-karst regions. One of the project's major accomplishments is the erection of an innovative hydropower-driven water supply facility located in a karst cave 100 m below ground and continuously supplying tens of thousands of people with fresh water. Referring to the plant's innovative character and the demanding conditions on-site, the implementation was a highly iterative process leading to today's autonomous operation by an Indonesian public authority. Based on the experiences gained during design, construction, operation and monitoring phase, this paper introduces an implementation approach for adapted technologies as well as a comprising technical and economical assessment of the plant's operation.

  20. What is known about community pharmacy supply of naloxone? A scoping review.

    PubMed

    Nielsen, Suzanne; Van Hout, Marie Claire

    2016-06-01

    There is growing evidence that expanded supply of take-home naloxone to prevent opioid overdose deaths is needed. Potential routes for expansion of naloxone provision include through community pharmacies. The aim of this scoping review is to establish what is known about community pharmacy supply of naloxone, in light of unique challenges and opportunities present in pharmacy settings. A scoping review methodology was employed using the six stage iterative process advocated by Arksey and O'Malley (2005) and Levac et al. (2010). Searches used key words and terms such as 'naloxone'; 'overdose prevention/drug overdose/opiate overdose'; 'community/retail pharmacy'; 'pharmacist/pharmacy/community pharmacy/pharmaceutical services'; 'professional practice/role'; 'community care'; attitude of health personnel'; 'training/supply/cost'. Appropriate search terms were selected for each database. After initial exploratory searches, comprehensive searches were conducted with Cochrane Database of Systematic Reviews, Medline, Medline in Process, Embase, PsycINFO and CINAHL. Eligibility criteria centered on whether studies broadly described supply of naloxone in community pharmacy or had content relating to community pharmacy supply. The search identified 95 articles, of which 16 were related to pharmacy supply of naloxone. Five themes were presented after initial review of the data and consultation with the project Expert Group, and are; 'Pharmacists Perceptions of Naloxone: Facilitators and Barriers', 'Patient Populations: Identification and Recruitment', 'Supply Systems and Cost', 'Legal Issues', and 'Training of Pharmacists and Community Pharmacy Naloxone Recipients'. Findings from this scoping review suggest that community pharmacy based supply of take-home naloxone warrants the community pharmacy based route for distribution of take home naloxone provision warrants further consideration and development. Existing strengths include a range of established supply models, and training curricula, few direct concerns regarding legal liability of pharmacists in the supply of naloxone (once legal supply systems have been established) and the wide range of potential identifiable patient populations, which include pain patients that may not be in contact with existing naloxone supply programmes. Copyright © 2016 Elsevier B.V. All rights reserved.

  1. 30 CFR 874.14 - Water supply restoration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Water supply restoration. 874.14 Section 874.14... ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.14 Water supply restoration. (a) Any... supply restoration projects. For purposes of this section, “water supply restoration projects” are those...

  2. Bridging worlds/charting new courses

    NASA Astrophysics Data System (ADS)

    This report describes the work being done within Sandia's renewable energy program. This work touches on four major disciplines. (1) Photovoltaics. The goal of this project is to develop costeffective, reliable energy system technologies for energy supplies worldwide produced by U.S. industry. It encompasses cell research and development, collector development, technology evaluation, systems engineering, domestic and international applications, and design assistance. (2) Solar Thermal. This project endeavors to develop and increase acceptance of solar thermal electric and industrial technologies as cost-competitive candidates for power generation and to promote their commercialization. Its' major activities are with dish/Stirling systems, the Solar Two power tower, design assistance to industry and users, technology development and research activities. (3) Wind. The wind project impacts domestic and international markets with commercially feasible systems for utility-scale and other applications of wind energy. The project conducts applied research in aerodynamics, structural dynamics, fatigue, materials and controls, and engineering systems, and develops cooperative work with industry. (4) Geothermal. This project is developing technology to increase proven geothermal reserves and is assisting industry in expanding geothermal power on-line. Development work is in stemhole drilling, drilling techniques, instrumentation for geothermal wells, acoustic telemetry, and drilling exploratory wells.

  3. Allocations for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Data Integration 2000 Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf product solution with commercially proven business processes. The COTS product solution set, of PassPort and People Soft software, supports finance, supply and chemical management/Material Safety Data Sheet, human resources. Allocations at Fluor Daniel Hanford are burdens added to base costs using a predetermined rate.

  4. Naval Ship Maintenance: An Analysis of the Dutch Shipbuilding Industry using the Knowledge Value Added, Systems Dynamics, and Integrated Risk Management Methodologies

    DTIC Science & Technology

    2013-04-01

    and Integrated Risk Management Methodologies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e...supply chains, risk management with real options, and sustainability . [dnford@nps.edu] Thomas J. Housel—Housel specializes in valuing intellectual...maintenance services for the RDN. Damen Schelde has used an ILS since 2002 to manage the shipbuilding process from project initiation through the

  5. Project CHECO Southeast Asia Report. VNAF Improvement and Modernization Program, July 1971 - December 1973

    DTIC Science & Technology

    1975-01-01

    Thus it’s not too difficult to understand that Vietnamese who follow Confucius, Mencius and Mo Tzu or who subscribe to Taoism , Buddhism or other...Bombing System, improving the Air Liaison Officer (ALO)/FAC system, improving the airlift control system, improving the food distribution system, and...to have to sustain many, many places that are surrounded and cannot get food and supplies other than by airlift, then they don’t have the capability

  6. A System Dynamics Modeling of Water Supply and Demand in Las Vegas Valley

    NASA Astrophysics Data System (ADS)

    Parajuli, R.; Kalra, A.; Mastino, L.; Velotta, M.; Ahmad, S.

    2017-12-01

    The rise in population and change in climate have posed the uncertainties in the balance between supply and demand of water. The current study deals with the water management issues in Las Vegas Valley (LVV) using Stella, a system dynamics modeling software, to model the feedback based relationship between supply and demand parameters. Population parameters were obtained from Center for Business and Economic Research while historical water demand and conservation practices were modeled as per the information provided by local authorities. The water surface elevation of Lake Mead, which is the prime source of water supply to the region, was modeled as the supply side whereas the water demand in LVV was modeled as the demand side. The study was done from the period of 1989 to 2049 with 1989 to 2012 as the historical one and the period from 2013 to 2049 as the future period. This study utilizes Coupled Model Intercomparison Project data sets (2013-2049) (CMIP3&5) to model different future climatic scenarios. The model simulates the past dynamics of supply and demand, and then forecasts the future water budget for the forecasted future population and future climatic conditions. The results can be utilized by the water authorities in understanding the future water status and hence plan suitable conservation policies to allocate future water budget and achieve sustainable water management.

  7. Electrical safety during transplantation.

    PubMed

    Amicucci, G L; Di Lollo, L; Fiamingo, F; Mazzocchi, V; Platania, G; Ranieri, D; Razzano, R; Camin, G; Sebastiani, G; Gentile, P

    2010-01-01

    Technologic innovations enable management of medical equipment and power supply systems, with improvements that can affect the technical aspects, economics, and quality of medical service. Herein are outlined some technical guidelines, proposed by Istituto Superiore per la Prevenzione e la Sicurezza del Lavoro, for increasing the effectiveness of the power supply system and the safety of patients and surgeons in the operating room, with particular focus on transplantation. The dependence of diagnoses and therapies on operation of the electrical equipment can potentially cause great risk to patients. Moreover, it is possible that faulty electrical equipment could produce current that may flow through the patient. Because patients are particularly vulnerable when their natural protection is considerably decreased, as during transplantation or other surgery, power supply systems must operate with a high degree of reliability and quality to prevent risk, and must be designed to reduce hazards from direct and indirect contact. Reliability of the power supply system is closely related to the quality of the project, choice of materials, and management of the system (eg, quality and frequency of servicing). Among the proposed guidelines, other than normal referencing, are (1) adoption of a monitoring system to improve the quality of the electrical parameters in the operating room, (2) institution of emergency procedures for management of electrical faults, (3) a procedure for management of fires in the operating room, (4) and maintenance interventions and inspections of medical devices to maintain minimal requirements of safety and performance. Copyright 2010 Elsevier Inc. All rights reserved.

  8. Impacts of Rising Air Temperatures and Emissions Mitigation on Electricity Demand and Supply in the United States. A Multi-Model Comparison

    DOE PAGES

    McFarland, James; Zhou, Yuyu; Clarke, Leon; ...

    2015-06-10

    The electric power sector both affects and is affected by climate change. Numerous studies highlight the potential of the power sector to reduce greenhouse gas emissions. Fewer studies have explored the physical impacts of climate change on the power sector. Our present analysis examines how projected rising temperatures affect the demand for and supply of electricity. We apply a common set of temperature projections to three well-known electric sector models in the United States: the US version of the Global Change Assessment Model (GCAM-USA), the Regional Electricity Deployment System model (ReEDS), and the Integrated Planning Model (IPM®). Incorporating the effectsmore » of rising temperatures from a control scenario without emission mitigation into the models raises electricity demand by 1.6 to 6.5 % in 2050 with similar changes in emissions. Moreover, the increase in system costs in the reference scenario to meet this additional demand is comparable to the change in system costs associated with decreasing power sector emissions by approximately 50 % in 2050. This result underscores the importance of adequately incorporating the effects of long-run temperature change in climate policy analysis.« less

  9. Business and continuity of operations: care of the critically ill and injured during pandemics and disasters: CHEST consensus statement.

    PubMed

    Tosh, Pritish K; Feldman, Henry; Christian, Michael D; Devereaux, Asha V; Kissoon, Niranjan; Dichter, Jeffrey R

    2014-10-01

    During disasters, supply chain vulnerabilities, such as power, transportation, and communication, may affect the delivery of medications and medical supplies and hamper the ability to deliver critical care services. Disasters also have the potential to disrupt information technology (IT) in health-care systems, resulting in interruptions in patient care, particularly critical care, and other health-care business functions. The suggestions in this article are important for all of those involved in a large-scale pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. The Business and Continuity of Operations Panel followed the American College of Chest Physicians (CHEST) Guidelines Oversight Committee's methodology in developing key questions regarding medication and supply shortages and the impact disasters may have on healthcare IT. Task force members met in person to develop the 13 key questions believed to be most relevant for Business and Continuity of Operations. A systematic literature review was then performed for relevant articles and documents, reports, and gray literature reported since 2007. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. Eighteen suggestions addressing mitigation strategies for supply chain vulnerabilities including medications and IT were generated. Suggestions offered to hospitals and health system leadership regarding medication and supply shortages include: (1) purchase key medications and supplies from more than one supplier, (2) substituted medications or supplies should ideally be similar to those already used by an institution's providers, (3) inventories should be tracked electronically to monitor medication/supply levels, (4) consider higher inventories of medications and supplies known or projected to be in short supply, (5) institute alternate use protocols when a (potential) shortage is identified, and 6) support government and nongovernmental organizations in efforts to address supply chain vulnerability. Health-care IT can be damaged in a disaster, and hospitals and health system leadership should have plans for urgently reestablishing local area networks. Planning should include using portable technology, plans for providing power, maintenance of a patient database that can accompany each patient, and protection of patient privacy. Additionally, long-term planning should include prioritizing servers and memory disk drives and possibly increasing inventory of critical IT supplies in preparedness planning. The provision of care to the critically ill or injured during a pandemic or disaster is dependent on key processes, such as the supply chain, and infrastructure, such as IT systems. Hospitals and health systems will help minimize the impact of medication and supply shortages with a focused strategy using the steps suggested. IT preparedness for maintaining local area networks, functioning clinical information systems, and adequate server and memory storage capacity will greatly enhance preparedness for hospital and health system clinical and business operations.

  10. Business and Continuity of Operations

    PubMed Central

    Tosh, Pritish K.; Feldman, Henry; Christian, Michael D.; Devereaux, Asha V.; Kissoon, Niranjan; Christian, Michael D.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Rubinson, Lewis; Amundson, Dennis; Anderson, Michael R.; Balk, Robert; Barfield, Wanda D.; Bartz, Martha; Benditt, Josh; Beninati, William; Berkowitz, Kenneth A.; Daugherty Biddison, Lee; Braner, Dana; Branson, Richard D; Burkle, Frederick M.; Cairns, Bruce A.; Carr, Brendan G.; Courtney, Brooke; DeDecker, Lisa D.; De Jong, Marla J.; Dominguez-Cherit, Guillermo; Dries, David; Einav, Sharon; Erstad, Brian L.; Etienne, Mill; Fagbuyi, Daniel B.; Fang, Ray; Feldman, Henry; Garzon, Hernando; Geiling, James; Gomersall, Charles D.; Grissom, Colin K.; Hanfling, Dan; Hick, John L.; Hodge, James G.; Hupert, Nathaniel; Ingbar, David; Kanter, Robert K.; King, Mary A.; Kuhnley, Robert N.; Lawler, James; Leung, Sharon; Levy, Deborah A.; Lim, Matthew L.; Livinski, Alicia; Luyckx, Valerie; Marcozzi, David; Medina, Justine; Miramontes, David A.; Mutter, Ryan; Niven, Alexander S.; Penn, Matthew S.; Pepe, Paul E.; Powell, Tia; Prezant, David; Reed, Mary Jane; Rich, Preston; Rodriquez, Dario; Roxland, Beth E.; Sarani, Babak; Shah, Umair A.; Skippen, Peter; Sprung, Charles L.; Subbarao, Italo; Talmor, Daniel; Toner, Eric S.; Tosh, Pritish K.; Upperman, Jeffrey S.; Uyeki, Timothy M.; Weireter, Leonard J.; West, T. Eoin; Wilgis, John; Ornelas, Joe; McBride, Deborah; Reid, David; Baez, Amado; Baldisseri, Marie; Blumenstock, James S.; Cooper, Art; Ellender, Tim; Helminiak, Clare; Jimenez, Edgar; Krug, Steve; Lamana, Joe; Masur, Henry; Mathivha, L. Rudo; Osterholm, Michael T.; Reynolds, H. Neal; Sandrock, Christian; Sprecher, Armand; Tillyard, Andrew; White, Douglas; Wise, Robert; Yeskey, Kevin

    2014-01-01

    BACKGROUND: During disasters, supply chain vulnerabilities, such as power, transportation, and communication, may affect the delivery of medications and medical supplies and hamper the ability to deliver critical care services. Disasters also have the potential to disrupt information technology (IT) in health-care systems, resulting in interruptions in patient care, particularly critical care, and other health-care business functions. The suggestions in this article are important for all of those involved in a large-scale pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS: The Business and Continuity of Operations Panel followed the American College of Chest Physicians (CHEST) Guidelines Oversight Committee’s methodology in developing key questions regarding medication and supply shortages and the impact disasters may have on healthcare IT. Task force members met in person to develop the 13 key questions believed to be most relevant for Business and Continuity of Operations. A systematic literature review was then performed for relevant articles and documents, reports, and gray literature reported since 2007. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. RESULTS: Eighteen suggestions addressing mitigation strategies for supply chain vulnerabilities including medications and IT were generated. Suggestions offered to hospitals and health system leadership regarding medication and supply shortages include: (1) purchase key medications and supplies from more than one supplier, (2) substituted medications or supplies should ideally be similar to those already used by an institution’s providers, (3) inventories should be tracked electronically to monitor medication/supply levels, (4) consider higher inventories of medications and supplies known or projected to be in short supply, (5) institute alternate use protocols when a (potential) shortage is identified, and 6) support government and nongovernmental organizations in efforts to address supply chain vulnerability. Health-care IT can be damaged in a disaster, and hospitals and health system leadership should have plans for urgently reestablishing local area networks. Planning should include using portable technology, plans for providing power, maintenance of a patient database that can accompany each patient, and protection of patient privacy. Additionally, long-term planning should include prioritizing servers and memory disk drives and possibly increasing inventory of critical IT supplies in preparedness planning. CONCLUSIONS: The provision of care to the critically ill or injured during a pandemic or disaster is dependent on key processes, such as the supply chain, and infrastructure, such as IT systems. Hospitals and health systems will help minimize the impact of medication and supply shortages with a focused strategy using the steps suggested. IT preparedness for maintaining local area networks, functioning clinical information systems, and adequate server and memory storage capacity will greatly enhance preparedness for hospital and health system clinical and business operations. PMID:25144857

  11. Reconciling Scale Mismatch in Water Governance, Hydro-climatic Processes and Infrastructure Systems of Water Supply in Las Vegas

    NASA Astrophysics Data System (ADS)

    Garcia, M. E.; Alarcon, T.; Portney, K.; Islam, S.

    2013-12-01

    Water resource systems are a classic example of a common pool resource due to the high cost of exclusion and the subtractability of the resource; for common pool resources, the performance of governance systems primarily depends on how well matched the institutional arrangements and rules are to the biophysical conditions and social norms. Changes in water governance, hydro-climatic processes and infrastructure systems occur on disparate temporal and spatial scales. A key challenge is the gap between current climate change model resolution, and the spatial and temporal scale of urban water supply decisions. This gap will lead to inappropriate management policies if not mediated through a carefully crafted decision making process. Traditional decision support and planning methods (DSPM) such as classical decision analysis are not equipped to deal with a non-static climate. While emerging methods such as decision scaling, robust decision making and real options are designed to deal with a changing climate, governance systems have evolved under the assumption of a static climate and it is not clear if these methods are well suited to the existing governance regime. In our study, these questions are contextualized by examining an urban water utility that has made significant changes in policy to adapt to changing conditions: the Southern Nevada Water Authority (SNWA) which serves metropolitan Las Vegas. Like most desert cities, Las Vegas exists because of water; the artesian springs of the Las Vegas Valley once provided an ample water supply for Native Americans, ranchers and later a small railroad city. However, population growth has increased demands far beyond local supplies. The area now depends on the Colorado River for the majority of its water supply. Natural climate variability with periodic droughts has further challenged water providers; projected climate changes and further population growth will exacerbate these challenges. Las Vegas is selected as a case study due to the combined challenges of population growth and climate change, common in the arid west, and due its cooperative institutional response to these challenges, unprecedented in the arid west. To begin to disentangle this question we have analyzed the institutional arrangements and rules which govern water decision making in the Las Vegas Valley and evaluated the existing DSPM used by the SNWA and partner utilities. Presented here are the preliminary results from an ongoing project.

  12. Development of a Consumable Inventory Management Strategy for the Supply Management Unit

    DTIC Science & Technology

    2007-12-01

    should be either returned to the supplier for partial credit or sent to disposal. This means that based 52 upon current and projected consumption ...economical to maintain based upon current and projected consumption rates. The magnitude of the feasible excess is driven by the base stock level prescribed...Days of Supply model to establish Requisitioning Objectives (RO) and Reorder Points (ROP), which are based upon historical usage, lead time, and supply

  13. WATER SUPPLY PIPE REPLACEMENT CONSIDERING SUSTAINABLE TRANSITION TO POPULATION DECREASED SOCIETY

    NASA Astrophysics Data System (ADS)

    Hosoi, Yoshihiko; Iwasaki, Yoji; Aklog, Dagnachew; Masuda, Takanori

    Social infrastructures are aging and population is decreasing in Japan. The aged social infrastructures should be renewed. At the same time, they are required to be moved into new framework suitable for population decreased societies. Furthermore, they have to continue to supply sufficient services even during transition term that renewal projects are carried out. Authors propose sustainable soft landing management of infrastructures and it is tried to apply to water supply pipe replacement in this study. Methodology to replace aged pipes not only aiming for the new water supply network which suits for population decreased condition but also ensuring supply service and feasibility while the project is carried out was developed. It is applied for a model water supply network and discussions were carried out.

  14. The Earth System Documentation (ES-DOC) Software Process

    NASA Astrophysics Data System (ADS)

    Greenslade, M. A.; Murphy, S.; Treshansky, A.; DeLuca, C.; Guilyardi, E.; Denvil, S.

    2013-12-01

    Earth System Documentation (ES-DOC) is an international project supplying high-quality tools & services in support of earth system documentation creation, analysis and dissemination. It is nurturing a sustainable standards based documentation eco-system that aims to become an integral part of the next generation of exa-scale dataset archives. ES-DOC leverages open source software, and applies a software development methodology that places end-user narratives at the heart of all it does. ES-DOC has initially focused upon nurturing the Earth System Model (ESM) documentation eco-system and currently supporting the following projects: * Coupled Model Inter-comparison Project Phase 5 (CMIP5); * Dynamical Core Model Inter-comparison Project (DCMIP); * National Climate Predictions and Projections Platforms Quantitative Evaluation of Downscaling Workshop. This talk will demonstrate that ES-DOC implements a relatively mature software development process. Taking a pragmatic Agile process as inspiration, ES-DOC: * Iteratively develops and releases working software; * Captures user requirements via a narrative based approach; * Uses online collaboration tools (e.g. Earth System CoG) to manage progress; * Prototypes applications to validate their feasibility; * Leverages meta-programming techniques where appropriate; * Automates testing whenever sensibly feasible; * Streamlines complex deployments to a single command; * Extensively leverages GitHub and Pivotal Tracker; * Enforces strict separation of the UI from underlying API's; * Conducts code reviews.

  15. Supply and Demand Balances of Selected College-Level Fields Projected for the SREB [Southern Regional Education Board] States.

    ERIC Educational Resources Information Center

    Engels, Richard A.; Galambos, Eva C.

    Few manpower projects in Southern states have focused on the demand for the output of four-year colleges and universities. Even fewer have attempted to link projections of demand for degree programs to the supply of graduates generated by those programs. Moreover, none have set the state outlook for a particular college-trained skill within a…

  16. Solar cell power for field instrumentation at White Sands Missile range. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, J.W. Jr..; Reckart, D.H. Jr; Milway, W.B.

    1978-01-01

    The initial phase of an Instrumentation Development Project to explore and document what solar power can do for remote field instrumentation systems is described. The work scope consisted of selection, design, construction, test, and delivery of a solar cell power system for White Sands Missile Range. A Drone Formation Control System Interrogator was selected; a power supply was built and installed in the San Andres Mountain Range at WSMR in late August 1977.

  17. Supply and Demand for Radiation Oncology in the United States: Updated Projections for 2015 to 2025

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pan, Hubert Y.; Haffty, Bruce G.; Falit, Benjamin P.

    Purpose: Prior studies have forecasted demand for radiation therapy to grow 10 times faster than the supply between 2010 and 2020. We updated these projections for 2015 to 2025 to determine whether this imbalance persists and to assess the accuracy of prior projections. Methods and Materials: The demand for radiation therapy between 2015 and 2025 was estimated by combining current radiation utilization rates determined by the Surveillance, Epidemiology, and End Results data with population projections provided by the US Census Bureau. The supply of radiation oncologists was forecast by using workforce demographics and full-time equivalent (FTE) status provided by themore » American Society for Radiation Oncology (ASTRO), current resident class sizes, and expected survival per life tables from the US Centers for Disease Control. Results: Between 2015 and 2025, the annual total number of patients receiving radiation therapy during their initial treatment course is expected to increase by 19%, from 490,000 to 580,000. Assuming a graduating resident class size of 200, the number of FTE physicians is expected to increase by 27%, from 3903 to 4965. In comparison with prior projections, the new projected demand for radiation therapy in 2020 dropped by 24,000 cases (a 4% relative decline). This decrease is attributable to an overall reduction in the use of radiation to treat cancer, from 28% of all newly diagnosed cancers in the prior projections down to 26% for the new projections. By contrast, the new projected supply of radiation oncologists in 2020 increased by 275 FTEs in comparison with the prior projection for 2020 (a 7% relative increase), attributable to rising residency class sizes. Conclusion: The supply of radiation oncologists is expected to grow more quickly than the demand for radiation therapy from 2015 to 2025. Further research is needed to determine whether this is an appropriate correction or will result in excess capacity.« less

  18. Generalized Projective Synchronization between Two Complex Networks with Time-Varying Coupling Delay

    NASA Astrophysics Data System (ADS)

    Sun, Mei; Zeng, Chang-Yan; Tian, Li-Xin

    2009-01-01

    Generalized projective synchronization (GPS) between two complex networks with time-varying coupling delay is investigated. Based on the Lyapunov stability theory, a nonlinear controller and adaptive updated laws are designed. Feasibility of the proposed scheme is proven in theory. Moreover, two numerical examples are presented, using the energy resource system and Lü's system [Physica A 382 (2007) 672] as the nodes of the networks. GPS between two energy resource complex networks with time-varying coupling delay is achieved. This study can widen the application range of the generalized synchronization methods and will be instructive for the demand-supply of energy resource in some regions of China.

  19. Quality assurance program for isotopic power systems

    NASA Astrophysics Data System (ADS)

    Hannigan, R. L.; Harnar, R. R.

    1982-12-01

    The Sandia National Laboratories Quality Assurance Program that applies to non-weapon (reimbursable) Radioisotopic Thermoelectric Generators is summarized. The program was implemented over the past 16 years on power supplies used in various space and terrestrial systems. The quality assurance (QA) activity of the program is in support of the Department of Energy, Office of Space Nuclear Projects. Basic elements of the program are described and examples of program documentation are presented.

  20. 75 FR 39226 - Combined Notice of Filings No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ...: ER10-1573-000. Applicants: Wolverine Power Supply Cooperative, Inc. Description: Wolverine Power Supply... Power Supply Cooperative, Inc. Description: Wolverine Power Supply Cooperative, Inc. submits tariff...-038; ER01-2641-018. Applicants: Tenaska Power Services Co., High Desert Power Project, LLC...

  1. Mapping Water Resources, Allocation and Consumption in the Mills River Basin

    NASA Astrophysics Data System (ADS)

    Hodes, J.; Jeuland, M. A.; Barros, A. P.

    2014-12-01

    Mountain basins and the headwaters of river basins along the foothills of major mountain ranges are undergoing rapid environmental change due to urban development, land acquisition by investors, population increase, and climate change. Classical water infrastructure in these regions is primarily designed to meet human water demand associated with agriculture, tourism, and economic development. Often overlooked and ignored is the fundamental interdependence of human water demand, ecosystem water demand, water rights and allocation, and water supply. A truly sustainable system for water resources takes into account ecosystem demand along with human infrastructure and economic demand, as well as the feedbacks that exist between them. Allocation policies need to take into account basin resilience that is the amount of stress the system can handle under varying future scenarios. Changes in stress on the system can be anthropogenic in the form of population increase, land use change, economic development, or may be natural in the form of climate change and decrease in water supply due to changes in precipitation. Mapping the water rights, supply, and demands within the basin can help determine the resiliency and sustainability of the basin. Here, we present a coupled natural human system project based in the French Broad River Basin, in the Southern Appalachians. In the first phase of the project, we are developing and implementing a coupled hydro-economics modeling framework in the Mills River Basin (MRB), a tributary of the French Broad. The Mills River Basin was selected as the core basin for implementing a sustainable system of water allocation that is adaptive and reflects the interdependence of water dependent sectors. The headwaters of the Mills River are in the foothills of the Appalachians, and are currently under substantial land use land cover (LULC) change pressure for agricultural purposes. In this regard, the MRB is representative of similar headwater basins in regions of complex terrain undergoing similar pressures such as the Andes and Himalayas. First results of the project including a quantitative organigram mapping water availability, water consumption, and the relationships among water stakeholders within the basin will be presented.

  2. The changing role of shrubs in rangeland-based livestock production systems: Can shrubs increase our forage supply?

    USDA-ARS?s Scientific Manuscript database

    Projected global increases in ruminant numbers and loss of native grasslands will present a number of challenges for livestock agriculture. Escalated demand for livestock products may stimulate interest in using shrubs on western rangelands. A paradigm shift is needed to change the role of shrubs in...

  3. A Systems Approach to Manage Drinking Water Quality through Integrated Model Projections, Adaptive Monitoring and Process Optimization - abstract

    EPA Science Inventory

    Drinking water supplies can be vulnerable to impacts from short-term weather events, long-term changes in land-use and climate, and water quality controls in treatment and distribution. Disinfection by-product (DBP) formation in drinking water is a prominent example to illustrate...

  4. A Systems Approach to Manage Drinking Water Quality through Integrated Model Projections, Adaptive Monitoring and Process Optimization

    EPA Science Inventory

    Drinking water supplies can be vulnerable to impacts from short-term weather events, long-term changes in land-use and climate, and water quality controls in treatment and distribution. Disinfection by-product (DBP) formation in drinking water is a prominent example to illustrate...

  5. 7 CFR 3560.103 - Maintaining housing projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., floors, and ceilings that are free of holes, evidence of current water leaks, and free of material that... which are operating properly, free of leaks, supply adequate hot water, and are fitted with temperature... malfunctions of equipment or damages to building systems such as a furnace breakdown or a water leak; and (iii...

  6. Faculty Salaries at California's Public Universities, 2007-08. Commission Report 07-15

    ERIC Educational Resources Information Center

    California Postsecondary Education Commission, 2007

    2007-01-01

    To prepare this report, the Commission examined faculty salary data supplied by the University of California (UC) and the California State University (CSU) systems. This report compares faculty salaries at California's public universities with faculty salaries at comparable institutions of higher education. Based on five-year trend projections,…

  7. 20-mN Variable Specific Impulse (Isp) Colloid Thruster

    NASA Technical Reports Server (NTRS)

    Demmons, Nathaniel

    2015-01-01

    Busek Company, Inc., has designed and manufactured an electrospray emitter capable of generating 20 mN in a compact package (7x7x1.7 in). The thruster consists of nine porous-surface emitters operating in parallel from a common propellant supply. Each emitter is capable of supporting over 70,000 electrospray emission sites with the plume from each emitter being accelerated through a single aperture, eliminating the need for individual emission site alignment to an extraction grid. The total number of emission sites during operation is expected to approach 700,000. This Phase II project optimized and characterized the thruster fabricated during the Phase I effort. Additional porous emitters also were fabricated for full-scale testing. Propellant is supplied to the thruster via existing feed-system and microvalve technology previously developed by Busek, under the NASA Space Technology 7's Disturbance Reduction System (ST7-DRS) mission and via follow-on electric propulsion programs. This project investigated methods for extending thruster life beyond the previously demonstrated 450 hours. The life-extending capabilities will be demonstrated on a subscale version of the thruster.

  8. Performance of the NEXT Engineering Model Power Processing Unit

    NASA Technical Reports Server (NTRS)

    Pinero, Luis R.; Hopson, Mark; Todd, Philip C.; Wong, Brian

    2007-01-01

    The NASA s Evolutionary Xenon Thruster (NEXT) project is developing an advanced ion propulsion system for future NASA missions for solar system exploration. An engineering model (EM) power processing unit (PPU) for the NEXT project was designed and fabricated by L-3 Communications under contract with NASA Glenn Research Center (GRC). This modular PPU is capable of processing up from 0.5 to 7.0 kW of output power for the NEXT ion thruster. Its design includes many significant improvements for better performance over the state-of-the-art PPU. The most significant difference is the beam supply which is comprised of six modules and capable of very efficient operation through a wide voltage range because of innovative features like dual controls, module addressing, and a high current mode. The low voltage power supplies are based on elements of the previously validated NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) PPU. The highly modular construction of the PPU resulted in improved manufacturability, simpler scalability, and lower cost. This paper describes the design of the EM PPU and the results of the bench-top performance tests.

  9. Design and Implementation of the Texas Medicaid DSRIP Program.

    PubMed

    Begley, Charles; Hall, Jessica; Shenoy, Amrita; Hanke, June; Wells, Rebecca; Revere, Lee; Lievsay, Nicole

    2017-04-01

    Texas is one of 8 states that have received a Medicaid 1115 Transformation Waiver in which federal supplemental payments are being used to incentivize delivery system reform. Under the Texas Transformation Waiver's 5-year Delivery System Reform Incentive Payment (DSRIP) program, hospitals and other providers have established regional health care partnerships, conducted regional needs assessments, and developed and implemented projects addressing local gaps in service. The projects were selected from menus, supplied by the Texas Health and Human Services Commission and the Centers for Medicare & Medicaid Services, which defined acceptable infrastructure development and/or program innovation and redesign initiatives. Providers receive payment for planning the projects and achieving metrics and milestones related to project implementation and performance. This article describes the major features of the Texas DSRIP model and the resulting implementation and performance to date in the most populous region of the state.

  10. Initial characterization of the groundwater system near the Lower Colorado Water Supply Project, Imperial Valley, California

    USGS Publications Warehouse

    Coes, Alissa L.; Land, Michael; Densmore, Jill N.; Landrum, Michael T.; Beisner, Kimberly R.; Kennedy, Jeffrey R.; Macy, Jamie P.; Tillman, Fred D.

    2015-01-01

    During and after lining the All-American Canal (2007–11), groundwater elevations in the Lower Colorado Water Supply Project area declined, while total dissolved solids concentrations remained relatively constant. The total dissolved solids concentrations in well LCWSP-2 ranged from 650 to 800 milligrams per liter during this study. Depth-specific water-quality and isotope sampling at well LCWSP-2 indicated the groundwater pumped from the deeper part of the screened interval (240–280 feet below land surface) contained a greater proportion of historical groundwater than the groundwater pumped from the shallower part of the screened interval (350–385 feet below land surface). Age-tracer data at well LCWSP-2 indicated that all depths of the screened interval had received recent recharge from seepage of Colorado River water from the All-American Canal.

  11. Historical evidence of importance to the industrialization of flat-plate silicon photovoltaic systems. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Smith, J. L.

    1978-01-01

    An analysis is given of the Low-Cost Silicon Solar Array Project plans for the industrialization of new production technologies expected to be forthcoming as a result of the project's technology development efforts. In particular, LSSA's mandate to insure an annual production capability of 500 MW peak for the photovoltaic supply industry by 1986 is critically examined. The examination focuses on one of the concerns behind this goal -- timely development of industrial capacity to supply anticipated demand. Some of the conclusions include: (1) construction of small-scale pilot plants should be undertaken only for purposes of technology development; (2) large-scale demonstrations should be undertaken only when the technology is well in hand; (3) commercial-scale production should be left to the private sector; (4) the 500-MW annual output goal should be shifted to Program Headquarters.

  12. 75 FR 8393 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... to reduce loss of water during the late irrigation season period of water shortage, and perforated... be taken in order to more efficiently utilize existing ground-water supplies in conjunction with existing surface water supplies. The Bonneville Unit of the Central Utah Project was authorized to develop...

  13. Ensuring water availability in Mekelle City, Northern Ethiopia: evaluation of the water supply sub-project

    NASA Astrophysics Data System (ADS)

    Oyedotun, Temitope D. Timothy

    2017-11-01

    The need and demand for water in the world are becoming acute with the growing population. This is mostly pressing in developing countries of which Mekelle City in Northern Ethiopia is not an exception. World Bank borehole-support sub-project was aimed at addressing this challenge. The evaluation of the intervention indicates that there is a significant increase in water supply in the city because of the sub-project. However, the increase in water supply has not been able to meet up with the already established and increasing demand. Coupled with this challenge are: the limited capacity of human capital and expertise that will ensure the proper management of borehole interventions; insufficient cost recovery for proper operation and maintenance of the projects; loss of land and farmlands and lack of compensations because of the projects which affect the livelihood.

  14. Assessing Vulnerability under Uncertainty in the Colorado River Basin: The Colorado River Basin Water Supply and Demand Study

    NASA Astrophysics Data System (ADS)

    Jerla, C.; Adams, P.; Butler, A.; Nowak, K.; Prairie, J. R.

    2013-12-01

    Spanning parts of the seven states, of Arizona, California, Colorado, New Mexico, Nevada, Utah, and Wyoming, the Colorado River is one of the most critical sources of water in the western United States. Colorado River allocations exceed the long-term supply and since the 1950s, there have been a number of years when the annual water use in the Colorado River Basin exceeded the yield. The Basin is entering its second decade of drought conditions which brings challenges that will only be compounded if projections of climate change are realized. It was against this backdrop that the Colorado River Basin Water Supply and Demand Study was conducted. The Study's objectives are to define current and future imbalances in the Basin over the next 50 years and to develop and analyze adaptation and mitigation strategies to resolve those imbalances. Long-term planning in the Basin involves the integration of uncertainty with respect to a changing climate and other uncertainties such as future demand and how policies may be modified to adapt to changing reliability. The Study adopted a scenario planning approach to address this uncertainty in which thousands of scenarios were developed to encompass a wide range of plausible future water supply and demand conditions. Using Reclamation's long-term planning model, the Colorado River Simulation System, the reliability of the system to meet Basin resource needs under these future conditions was projected both with and without additional future adaptation strategies in place. System reliability metrics were developed in order to define system vulnerabilities, the conditions that lead to those vulnerabilities, and sign posts to indicate if the system is approaching a vulnerable state. Options and strategies that reduce these vulnerabilities and improve system reliability were explored through the development of portfolios. Four portfolios, each with different management strategies, were analyzed to assess their effectiveness at reducing system vulnerabilities and the improving the resiliency of the Basin to vulnerable conditions. The Study is the most comprehensive long-term assessment to date of the Basin and it confirmed that without action, the Colorado River system will become increasingly challenged to sustain the communities and resources that rely on its water supply. The Study was conducted by the Bureau of Reclamation and its consultant team (CH2M Hill, Black & Veatch, and the RAND Corporation) and the seven Colorado River Basin States, in collaboration with a broad range of stakeholders throughout the Basin. The Study's strong technical foundation forms a basis from which important discussions can begin regarding possible actions to resolve future supply and demand imbalances in order to help ensure the sustainability of the Colorado River system. This talk will provide an overview of the Study's approach and findings, with a focus on the Study's assessment and characterization of vulnerability under uncertainty.

  15. 23 CFR 140.908 - Materials and supplies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Reimbursement for Railroad Work § 140.908 Materials and supplies. (a) Procurement. Materials and supplies, if... projects where a company actually suffers loss by application of credits, the company shall have the...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maxwell, S.; Berger, D.; Zuluaga, M.

    In multifamily buildings, particularly in the Northeast, exhaust ventilation strategies are the norm as a means of meeting both local exhaust and whole-unit mechanical ventilation rates. The issue of where the "fresh" air is coming from is gaining significance as air-tightness standards for enclosures become more stringent. CARB researchers have found that most new high performance, multifamily housing in the Northeast use one of four strategies for ventilation: continuous exhaust only with no designated supply or make-up air source, continuous exhaust with ducted make-up air to apartments, continuous exhaust with supply through a make-up air device integral to the unitmore » HVAC, and continuous exhaust with supply through a passive inlet device, such as a trickle vent. Insufficient information is available to designers on how these various systems are best applied. Product performance data are based on laboratory tests, but there is no guarantee that those conditions will exist consistently in the finished building. In this research project, CARB evaluated the four ventilation strategies in the field to validate system performance.« less

  17. Climate and water resource change impacts and adaptation potential for US power supply

    DOE PAGES

    Miara, Ariel; Macknick, Jordan E.; Vorosmarty, Charles J.; ...

    2017-10-30

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptationmore » strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. As a result, climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.« less

  18. Mission Benefits Analysis of Logistics Reduction Technologies

    NASA Technical Reports Server (NTRS)

    Ewert, Michael K.; Broyan, James Lee, Jr.

    2013-01-01

    Future space exploration missions will need to use less logistical supplies if humans are to live for longer periods away from our home planet. Anything that can be done to reduce initial mass and volume of supplies or reuse or recycle items that have been launched will be very valuable. Reuse and recycling also reduce the trash burden and associated nuisances, such as smell, but require good systems engineering and operations integration to reap the greatest benefits. A systems analysis was conducted to quantify the mass and volume savings of four different technologies currently under development by NASA s Advanced Exploration Systems (AES) Logistics Reduction and Repurposing project. Advanced clothing systems lead to savings by direct mass reduction and increased wear duration. Reuse of logistical items, such as packaging, for a second purpose allows fewer items to be launched. A device known as a heat melt compactor drastically reduces the volume of trash, recovers water and produces a stable tile that can be used instead of launching additional radiation protection. The fourth technology, called trash-to-gas, can benefit a mission by supplying fuel such as methane to the propulsion system. This systems engineering work will help improve logistics planning and overall mission architectures by determining the most effective use, and reuse, of all resources.

  19. Climate and water resource change impacts and adaptation potential for US power supply

    NASA Astrophysics Data System (ADS)

    Miara, Ariel; Macknick, Jordan E.; Vörösmarty, Charles J.; Tidwell, Vincent C.; Newmark, Robin; Fekete, Balazs

    2017-11-01

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptation strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. Climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.

  20. Climate and water resource change impacts and adaptation potential for US power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miara, Ariel; Macknick, Jordan E.; Vorosmarty, Charles J.

    Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptationmore » strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. As a result, climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.« less

  1. Potential implementation of light steel housing system for affordable housing project in Malaysia

    NASA Astrophysics Data System (ADS)

    Saikah, M.; Kasim, N.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. A.

    2017-11-01

    An unparalleled number between housing demand and housing supply in Malaysia has increased the housing prices, which gives consequences to the homeownership issue. One way to reduce the housing price is by faster increase the number of affordable housing, but the construction sector faces difficulties in delivering as expected number by using conventional and current industrialised building system (IBS) due to the issue related high project cost, time and labour. Therefore, light steel housing (LSH) system as one of another type of IBS method can be utilised in housing construction project. This method can replace the conventional method that was currently used in the construction of affordable housing project. The objectives of this study are to identify the potential of LSH and influencing factors of system implementation. This is an initial stage to review the previous study related to LSH implementation in developed and developing countries. The previous study will be analysed regarding advantages and disadvantages of LSH and factors that influence the implementation of the system. Based on the literature review it is expected to define the potential and influencing factors of the LSH system. The findings are meaningful in framing and enhance construction housing method of an affordable housing project in Malaysia.

  2. The analysis of the hot water consumption and energy performance before and after renovation in multi-apartment buildings

    NASA Astrophysics Data System (ADS)

    Tumanova, K.; Borodinecs, A.; Geikins, A.

    2017-10-01

    The article presents the results of hot water supply system analysis. Taking into account that the current consumption of hot water differs from normative values, real measured data of hot water consumption in multi-apartment buildings from year 2013 until year 2015 have been analyzed. Also, the thermal energy consumption for hot water preparation has been analyzed. Based on aggregated data and taking into account the fact that renovated systems of hot water supply in existing multi-apartment buildings have same pipelines’ diameters, it was analyzed how these systems are economically and energy efficient. For the study, residential buildings in Riga, which have different architectural and engineering solutions for hot water supply systems, were selected. The study was based on thermal energy consumption measurements, which were taken at the individual heating system’s manifolds. This study was done in order to develop database on hot water consumption in civil buildings and define difference in key performance criteria in unclassified buildings. Obtained results allows to reach European Regional Development Fund project “NEARLY ZERO ENERGY SOLUTIONS FOR UNCLASSIFIED BUILDINGS” Nr. 1.1.1.116A048 main targets.

  3. Modular High Voltage Power Supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newell, Matthew R.

    The goal of this project is to develop a modular high voltage power supply that will meet the needs of safeguards applications and provide a modular plug and play supply for use with standard electronic racks.

  4. Multimission Modular Spacecraft Ground Support Software System (MMS/GSSS) state-of-the-art computer systems/ compatibility study

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The compatibility of the Multimission Modular Spacecraft (MMS) Ground Support Software System (GSSS), currently operational on a ModComp IV/35, with the VAX 11/780 system is discussed. The compatibility is examined in various key areas of the GSSS through the results of in depth testing performed on the VAX 11/780 and ModComp IV/35 systems. The compatibility of the GSSS with the ModComp CLASSIC is presented based upon projections from ModComp supplied literature.

  5. Energy availabilities for state and local development: projected energy patterns for 1985 and 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vogt, D. P.; Rice, P. L.; Corey, T. A.

    1979-11-01

    This report (one of a series) presents projections of the energy supply, demand, and net imports of seven fuel types (gasoline, distillates, residual oil, crude, natural gas, coal, electricity) and four final consuming sectors. To facilitate detailed regional analysis these projections have been prepared for Bureau of Economic Analysis (BEA) areas, states, census regions, and the nation for 1985 and 1990. The data are formatted to present regional energy availability from primary extraction, as well as from energy-transformation processes. The tables depict energy balances between availability and use for each specific fuel. The objective of this series is to providemore » a consistent base of historic and projected energy information within a standard format. Such a framework should aid regional policymakers in their consideration of regional growth issues that may be influenced by the regional energy system. However, for analysis of specific regions, this basic data should be supplemented by additional information which only the local policy analyst can bring to bear in his or her assessment of the energy conditions that characterize the region. Earlier volumes in this series have proved useful for both specific and general analysis of this type, and it is hoped that the current volume will prove equally so. This volume presents an updated benchmark projection series, which captures recent developments in the business as usual projections of energy supply and consumption due to national policy developments since the 1976 National Energy Outlook projection series were prepared.« less

  6. Recycled water for stream flow augmentation: benefits, challenges, and the presence of wastewater-derived organic compounds.

    PubMed

    Plumlee, Megan H; Gurr, Christopher J; Reinhard, Martin

    2012-11-01

    Stream flow augmentation with recycled water has the potential to improve stream habitat and increase potable water supply, but the practice is not yet well understood or documented. The objectives of this report are to present a short review illustrated by a case study, followed by recommendations for future stream flow augmentation projects. Despite the fact that wastewater discharge to streams is commonplace, a water agency pursuing stream flow augmentation with recycled water will face unique challenges. For example, recycled water typically contains trace amounts of organic wastewater-derived compounds (OWCs) for which the potential ecological risks must be balanced against the benefits of an augmentation project. Successful stream flow augmentation with recycled water requires that the lead agency clearly articulate a strong project rationale and identify key benefits. It must be assumed that the public will have some concerns about water quality. Public acceptance may be better if an augmentation project has co-benefits beyond maintaining stream ecosystems, such as improving water system supply and reliability (i.e. potable use offset). Regulatory or project-specific criteria (acceptable concentrations of priority OWCs) would enable assessment of ecosystem impacts and demonstration of practitioner compliance. Additional treatment (natural or engineered) of the recycled water may be considered. If it is not deemed necessary or feasible, existing recycled water quality may be adequate to achieve project goals depending on project rationale, site and water quality evaluation, and public acceptance.

  7. 7 CFR 4284.922 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... agreement with another member of the supply network that is engaged in the value chain on a marketing... revenues resulting from the project that will benefit the producer applicants supplying the majority of the... disadvantaged group. (2) If the applicant is applying for Mid-Tier Value Chain reserved funds, the applicant...

  8. 7 CFR 4284.922 - Project eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agreement with another member of the supply network that is engaged in the value chain on a marketing... revenues resulting from the project that will benefit the producer applicants supplying the majority of the... disadvantaged group. (2) If the applicant is applying for Mid-Tier Value Chain reserved funds, the applicant...

  9. 7 CFR 4284.922 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... agreement with another member of the supply network that is engaged in the value chain on a marketing... revenues resulting from the project that will benefit the producer applicants supplying the majority of the... disadvantaged group. (2) If the applicant is applying for Mid-Tier Value Chain reserved funds, the applicant...

  10. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... leak detection and control program; (2) Use of the best practicable water-conserving devices and... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN...

  11. Space Shuttle Program Primary Avionics Software System (PASS) Success Legacy - Major Accomplishments and Lessons Learned Detail Historical Timeline Analysis

    NASA Technical Reports Server (NTRS)

    Orr, James K.

    2010-01-01

    This presentation focuses on the Space Shuttle Primary Avionics Software System (PASS) and the people who developed and maintained this system. One theme is to provide quantitative data on software quality and reliability over a 30 year period. Consistent data relates to code break discrepancies. Requirements were supplied from external sources. Requirement inspections and measurements not implemented until later, beginning in 1985. Second theme is to focus on the people and organization of PASS. Many individuals have supported the PASS project over the entire period while transitioning from company to company and contract to contract. Major events and transitions have impacted morale (both positively and negatively) across the life of the project.

  12. Scoping Report: Advanced Technologies for Multi-Load Washers in Hospitality and Healthcare

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parker, Graham B.; Boyd, Brian K.; Petersen, Joseph M.

    The purpose of this demonstration project is to quantify the energy savings and water efficiency potential of commercial laundry wastewater recycling systems and low-temperature detergent supply systems to help promote the adoption of these technologies in the commercial sector. This project will create a set of technical specifications for efficient multi-load laundry systems (both new and retrofit) tailored for specific applications and/or sectors (e.g., hospitality, health care). The specifications will be vetted with the appropriate Better Buildings Alliance (BBA) members (e.g., Commercial Real Estate Energy Alliance, Hospital Energy Alliance), finalized, published, and disseminated to enable widespread technology transfer in themore » industry and specifically among BBA partners.« less

  13. MouseNet database: digital management of a large-scale mutagenesis project.

    PubMed

    Pargent, W; Heffner, S; Schäble, K F; Soewarto, D; Fuchs, H; Hrabé de Angelis, M

    2000-07-01

    The Munich ENU Mouse Mutagenesis Screen is a large-scale mutant production, phenotyping, and mapping project. It encompasses two animal breeding facilities and a number of screening groups located in the general area of Munich. A central database is required to manage and process the immense amount of data generated by the mutagenesis project. This database, which we named MouseNet(c), runs on a Sybase platform and will finally store and process all data from the entire project. In addition, the system comprises a portfolio of functions needed to support the workflow management of the core facility and the screening groups. MouseNet(c) will make all of the data available to the participating screening groups, and later to the international scientific community. MouseNet(c) will consist of three major software components:* Animal Management System (AMS)* Sample Tracking System (STS)* Result Documentation System (RDS)MouseNet(c) provides the following major advantages:* being accessible from different client platforms via the Internet* being a full-featured multi-user system (including access restriction and data locking mechanisms)* relying on a professional RDBMS (relational database management system) which runs on a UNIX server platform* supplying workflow functions and a variety of plausibility checks.

  14. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-10-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysis production was completed tomore » produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio-based fuels is scheduled to begin in October of 2001. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam.« less

  15. Achieving mask order processing automation, interoperability and standardization based on P10

    NASA Astrophysics Data System (ADS)

    Rodriguez, B.; Filies, O.; Sadran, D.; Tissier, Michel; Albin, D.; Stavroulakis, S.; Voyiatzis, E.

    2007-02-01

    Last year the MUSCLE (Masks through User's Supply Chain: Leadership by Excellence) project was presented. Here is the project advancement. A key process in mask supply chain management is the exchange of technical information for ordering masks. This process is large, complex, company specific and error prone, and leads to longer cycle times and higher costs due to missing or wrong inputs. Its automation and standardization could produce significant benefits. We need to agree on the standard for mandatory and optional parameters, and also a common way to describe parameters when ordering. A system was created to improve the performance in terms of Key Performance Indicators (KPIs) such as cycle time and cost of production. This tool allows us to evaluate and measure the effect of factors, as well as the effect of implementing the improvements of the complete project. Next, a benchmark study and a gap analysis were performed. These studies show the feasibility of standardization, as there is a large overlap in requirements. We see that the SEMI P10 standard needs enhancements. A format supporting the standard is required, and XML offers the ability to describe P10 in a flexible way. Beyond using XML for P10, the semantics of the mask order should also be addressed. A system design and requirements for a reference implementation for a P10 based management system are presented, covering a mechanism for the evolution and for version management and a design for P10 editing and data validation.

  16. Infusion of New Technology into the QML System

    NASA Technical Reports Server (NTRS)

    Agarwal, Shri

    2012-01-01

    QML stands for the Qualified Manufacturer List. It is maintained by DLA-Land and Maritime (formerly known as the Defense Supply Center Columbus, DSCC). This talk will address how we are bringing new technology products into the QML system. The focus will be on microcircuit parts used in space application. A new effort championed by NASA will be described. NASA EEE Parts Assurance Group (NEPAG) is making every effort to strengthen the MIL system and thereby support the space flight projects

  17. Advanced Data Collection for Inventory Management

    NASA Technical Reports Server (NTRS)

    Opresko, G. A.; Leet, J. H.; Mcgrath, D. F.; Eidson, J.

    1987-01-01

    Bar-coding, radio-frequency, and voice-operated systems selected. Report discusses study of state-of-the-art in automated collection of data for management of large inventories. Study included comprehensive search of literature on data collection and inventory management, visits to existing automated inventory systems, and tours of selected supply and transportation facilities at Kennedy Space Center. Information collected analyzed in view of needs of conceptual inventory-management systems for Kennedy Space Center and for manned space station and other future space projects.

  18. Assessment of climate change impact on water diversion strategies of Melamchi Water Supply Project in Nepal

    NASA Astrophysics Data System (ADS)

    Shrestha, Sangam; Shrestha, Manish; Babel, Mukand S.

    2017-04-01

    This paper analyzes the climate change impact on water diversion plan of Melamchi Water Supply Project (MWSP) in Nepal. The MWSP is an interbasin water transfer project aimed at diverting water from the Melamchi River of the Indrawati River basin to Kathmandu Valley for drinking water purpose. Future temperature and precipitation of the basin were predicted using the outputs of two regional climate models (RCMs) and two general circulation models (GCMs) under two representative concentration pathway (RCP) scenarios which were then used as inputs to Soil and Water Assessment Tool (SWAT) to predict the water availability and evaluate the water diversion strategies in the future. The average temperature of the basin is projected to increase by 2.35 to 4.25 °C under RCP 4.5 and RCP 8.5, respectively, by 2085s. The average precipitation in the basin is projected to increase by 6-18 % in the future. The annual water availability is projected to increase in the future; however, the variability is observed in monthly water availability in the basin. The water supply and demand scenarios of Kathmandu Valley was also examined by considering the population increase, unaccounted for water and water diversion from MWSP in the future. It is observed that even with the additional supply of water from MWSP and reduction of unaccounted for water, the Kathmandu Valley will be still under water scarcity in the future. The findings of this study can be helpful to formulate water supply and demand management strategies in Kathmandu Valley in the context of climate change in the future.

  19. Orbital debris removal and salvage system

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Four Texas A&M University projects are discussed. The first project is a design to eliminate a majority of orbital debris. The Orbital Debris and Salvage System will push the smaller particles into lower orbits where their orbits will decay at a higher rate. This will be done by momentum transfer via laser. The salvageable satellites will be delivered to the Space Station by an Orbital Transfer Vehicle. The rest of the debris will be collected by Salvage I. The second project is the design of a space based satellite system to prevent the depletion of atmospheric ozone. The focus is on ozone depletion in the Antarctic. The plan is to use an orbiting solar array system designed to transmit microwaves at a frequency of 22 GHz over the region in order to dissipate polar stratospheric clouds that form during the months beginning in August and ending in October. The third project, Project Poseidon, involves a conceptual design of a space based hurricane control system consisting of a network of 21 low-orbiting laser platforms arranged in three rings designed to heat the upper atmosphere of a developing tropical depression. Fusion power plants are proposed to provide power for the lasers. The fourth project, Project Donatello, involves a proposed Mars exploration initiative for the year 2050. The project is a conceptual design for a futuristic superfreighter that will transport large numbers of people and supplies to Mars for the construction of a full scale scientific and manufacturing complex.

  20. Safety system augmentation at Russian nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scerbo, J.A.; Satpute, S.N.; Donkin, J.Y.

    1996-12-31

    This paper describes the design and procurement of a Class IE DC power supply system to upgrade plant safety at the Kola Nuclear Power Plant (NPP). Kola NPP is located above the Arctic circle at Polyarnie Zorie, Murmansk, Russia. Kola NPP consists of four units. Units 1 and 2 have VVER-440/230 type reactors: Units 3 and 4 have VVER-440/213 type reactors. The VVER-440 reactor design is similar to the pressurized water reactor design used in the US. This project provided redundant, Class 1E DC station batteries and DC switchboards for Kola NPP, Units 1 and 2. The new DC powermore » supply system was designed and procured in compliance with current nuclear design practices and requirements. Technical issues that needed to be addressed included reconciling the requirements in both US and Russian codes and satisfying the requirements of the Russian nuclear regulatory authority. Close interface with ATOMENERGOPROEKT (AEP), the Russian design organization, KOLA NPP plant personnel, and GOSATOMNADZOR (GAN), the Russian version of US Nuclear Regulatory Commission, was necessary to develop a design that would assure compliance with current Russian design requirements. Hence, this project was expected to serve as an example for plant upgrades at other similar VVER-440 nuclear plants. In addition to technical issues, the project needed to address language barriers and the logistics of shipping equipment to a remote section of the Former Soviet Union (FSU). This project was executed by Burns and Roe under the sponsorship of the US DOE as part of the International Safety Program (INSP). The INSP is a comprehensive effort, in cooperation with partners in other countries, to improve nuclear safety worldwide. A major element within the INSP is the improvement of the safety of Soviet-designed nuclear reactors.« less

  1. Precipitation isotopes link regional climate patterns to water supply in a tropical mountain forest, eastern Puerto Rico

    USGS Publications Warehouse

    Scholl, Martha A.; Murphy, Sheila F.

    2014-01-01

    Like many mountainous areas in the tropics, watersheds in the Luquillo Mountains of eastern Puerto Rico have abundant rainfall and stream discharge and provide much of the water supply for the densely populated metropolitan areas nearby. Projected changes in regional temperature and atmospheric dynamics as a result of global warming suggest that water availability will be affected by changes in rainfall patterns. It is essential to understand the relative importance of different weather systems to water supply to determine how changes in rainfall patterns, interacting with geology and vegetation, will affect the water balance. To help determine the links between climate and water availability, stable isotope signatures of precipitation from different weather systems were established to identify those that are most important in maintaining streamflow and groundwater recharge. Precipitation stable isotope values in the Luquillo Mountains had a large range, from fog/cloud water with δ2H, δ18O values as high as +12 ‰, −0.73 ‰ to tropical storm rain with values as low as −127 ‰, −16.8 ‰. Temporal isotope values exhibit a reverse seasonality from those observed in higher latitude continental watersheds, with higher isotopic values in the winter and lower values in the summer. Despite the higher volume of convective and low-pressure system rainfall, stable isotope analyses indicated that under the current rainfall regime, frequent trade -wind orographic showers contribute much of the groundwater recharge and stream base flow. Analysis of rain events using 20 years of 15 -minute resolution data at a mountain station (643 m) showed an increasing trend in rainfall amount, in agreement with increased precipitable water in the atmosphere, but differing from climate model projections of drying in the region. The mean intensity of rain events also showed an increasing trend. The determination of recharge sources from stable isotope tracers indicates that water supply will be affected if regional atmospheric dynamics change trade- wind orographic rainfall patterns in the Caribbean.

  2. Mars Lander/Rover vehicle development: An advanced space design project for USRA and NASA/OAST

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The results of the studies on one particular part of the Mars Lander/Rover (MLR) system are contained: the Balloon Rover. This component vehicle was selected for further research and design because of the lack of technical literature on this subject, as compared to surface rover technology. Landing site selection; balloon system development and deployment; optics and communications; and the payload power supply are described.

  3. Automated Ground Umbilical Systems (AGUS) Project

    NASA Technical Reports Server (NTRS)

    Gosselin, Armand M.

    2007-01-01

    All space vehicles require ground umbilical systems for servicing. Servicing requirements can include, but are not limited to, electrical power and control, propellant loading and venting, pneumatic system supply, hazard gas detection and purging as well as systems checkout capabilities. Of the various types of umbilicals, all require several common subsystems. These typically include an alignment system, mating and locking system, fluid connectors, electrical connectors and control !checkout systems. These systems have been designed to various levels of detail based on the needs for manual and/or automation requirements. The Automated Ground Umbilical Systems (AGUS) project is a multi-phase initiative to develop design performance requirements and concepts for launch system umbilicals. The automation aspect minimizes operational time and labor in ground umbilical processing while maintaining reliability. This current phase of the project reviews the design, development, testing and operations of ground umbilicals built for the Saturn, Shuttle, X-33 and Atlas V programs. Based on the design and operations lessons learned from these systems, umbilicals can be optimized for specific applications. The product of this study is a document containing details of existing systems and requirements for future automated umbilical systems with emphasis on design-for-operations (DFO).

  4. Towards risk-based drought management in the Netherlands: making water supply levels transparent to water users

    NASA Astrophysics Data System (ADS)

    Maat Judith, Ter; Marjolein, Mens; Vuren Saskia, Van; der Vat Marnix, Van

    2016-04-01

    To prepare the Dutch Delta for future droughts and water scarcity, a nation-wide 4-year project, called Delta Programme, assessed the impact of climate change and socio-economic development, and explored strategies to deal with these impacts. The Programme initiated a joint approach to water supply management with stakeholders and developed a national adaptation plan that is able to adapt to future uncertain conditions. The adaptation plan consists of a set of preferred policy pathways - sequences of possible actions and measures through time - to achieve targets while responding in a flexible manner to uncertain developments over time, allowing room to respond to new opportunities and insights. With regard to fresh water allocation, the Delta Programme stated that supplying water of sufficient quality is a shared responsibility that requires cohesive efforts among users in the main and regional water system. The national and local authorities and water users involved agreed that the water availability and, where relevant, the water quality should be as transparent and predictable as possible under normal, dry and extremely dry conditions. They therefore introduced the concept of "water supply service levels", which should describe water availability and quality that can be delivered with a certain return period, for all regions and all relevant water users in the Netherlands. The service levels form an addition to the present policy and should be decided on by 2021. At present water allocation during periods of (expected) water shortage occurs according to a prearranged ranking system (a water hierarchy scheme based on a list of priorities), if water availability drops below a critical low level. The aim is to have supply levels available that are based on the probability of occurrence and economic impact of water shortage, and that are transparent for all water users in the regional water systems and the main water system. As part of the European project Improving Predictions and Management of Hydrological Extremes (IMPREX), running from 2016-2019, a consortium of the Dutch research institute Deltares and the Dutch water management consultant HKV will design and build a tool to support quantitative risk-informed decision-making for fresh water management for the Netherlands, in particular the decision on water supply service levels. The research will be conducted in collaboration with the Dutch Ministry for Infrastructure and Environment, the Freshwater Supply Programme Office, the Dutch governmental organisation responsible for water management (Rijkswaterstaat), the Foundation for Applied Water Research, (STOWA, knowledge centre of the water boards) and a number of water boards. In the session we will present the conceptual framework for a risk-based approach for water shortage management and share thoughts on how the proposed tool can be applied in the Dutch water management context.

  5. 75 FR 32209 - North San Pablo Bay Restoration and Reuse Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ... Napa counties are facing long-term water supply shortfalls. Surface and groundwater supplies within... water levels and water quality. Recycled water can augment local water supplies on a regional basis... reliability. Additionally, reliable water supply is needed in order to continue the restoration of tidal...

  6. 22 CFR 202.5 - Approval of programs, projects and services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and taxes; (iv) The supplies will be treated as a supplementary resource; (v) The supplies will be... supplies will be received, unloaded, warehoused, and transported cost-free to points of distribution; (3... assumed by the agency for the noncommercial distribution of the supplies free of cost to the persons...

  7. 28 CFR 70.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 70.35 Supplies and... any other Federally-sponsored project or program, the recipient may retain the supplies for use on non... recipient must not use supplies acquired with Federal funds to provide services to non-Federal outside...

  8. 45 CFR 2543.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.35 Supplies and other... federally-sponsored project or program, the recipient shall retain the supplies for use on non-Federal... recipient shall not use supplies acquired with Federal funds to provide services to non-Federal outside...

  9. 45 CFR 2543.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.35 Supplies and other... federally-sponsored project or program, the recipient shall retain the supplies for use on non-Federal... recipient shall not use supplies acquired with Federal funds to provide services to non-Federal outside...

  10. 28 CFR 70.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 70.35 Supplies and... any other Federally-sponsored project or program, the recipient may retain the supplies for use on non... recipient must not use supplies acquired with Federal funds to provide services to non-Federal outside...

  11. 45 CFR 2543.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.35 Supplies and other... federally-sponsored project or program, the recipient shall retain the supplies for use on non-Federal... recipient shall not use supplies acquired with Federal funds to provide services to non-Federal outside...

  12. A Methodology for Projecting U.S.-Flag Commercial Tanker Capacity

    DTIC Science & Technology

    1986-03-01

    total crude supply for the total US is less than the sum of the total crude supplies of the PADDs . The algorithm generating the output shown in tables...other PADDs . Accordingly, projected receipts for PADD V are zero , and in conjunction with the values for the vari- ables that previously were...SHIPMENTS ALGORITHM This section presents the mathematics of the algorithm that generates the shipments projections for each PADD . The notation

  13. Projections of the U.S. timber supply and demand situation to 2050 : draft findings from the USDA Forest Service 2000 RPA Timber Assessment.

    Treesearch

    Richard Haynes; Darius Adams; Ralph Alig; David Brooks; Irene Durbak; James Howard; Peter Ince; David McKeever; John Mills; Ken Skog; Xiaoping Zhou

    2001-01-01

    The Draft RPA Timber Assessment projects, over the next 50 years, the likelihood of increasing abundance of softwoods in the South and decreasing abundance of hardwoods in the South. These trends in supply, along with projected contributions from the North and West, imply U.S. consumption needs could be met without increasing net product imports and would not increase...

  14. Design and Implementation of Geothermal Energy Systems at West Chester University

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cuprak, Greg

    West Chester University has launched a comprehensive transformation of its campus heating and cooling systems from traditional fossil fuels (coal, oil and natural gas) to geothermal. This change will significantly decrease the institution’s carbon footprint and serve as a national model for green campus efforts. The institution has designed a phased series of projects to build a district geo-exchange system with shared well fields, central pumping station and distribution piping to provide the geo-exchange water to campus buildings as their internal building HVAC systems is changed to be able to use the geo-exchange water. This project addresses the US Departmentmore » of Energy Office of Energy Efficiency and Renewable Energy (EERE) goal to invest in clean energy technologies that strengthen the economy, protect the environment, and reduce dependence on foreign oil. In addition, this project advances EERE’s efforts to establish geothermal energy as an economically competitive contributor to the US energy supply.« less

  15. Urban water sustainability: an integrative framework for regional water management

    NASA Astrophysics Data System (ADS)

    Gonzales, P.; Ajami, N. K.

    2015-11-01

    Traditional urban water supply portfolios have proven to be unsustainable under the uncertainties associated with growth and long-term climate variability. Introducing alternative water supplies such as recycled water, captured runoff, desalination, as well as demand management strategies such as conservation and efficiency measures, has been widely proposed to address the long-term sustainability of urban water resources. Collaborative efforts have the potential to achieve this goal through more efficient use of common pool resources and access to funding opportunities for supply diversification projects. However, this requires a paradigm shift towards holistic solutions that address the complexity of hydrologic, socio-economic and governance dynamics surrounding water management issues. The objective of this work is to develop a regional integrative framework for the assessment of water resource sustainability under current management practices, as well as to identify opportunities for sustainability improvement in coupled socio-hydrologic systems. We define the sustainability of a water utility as the ability to access reliable supplies to consistently satisfy current needs, make responsible use of supplies, and have the capacity to adapt to future scenarios. To compute a quantitative measure of sustainability, we develop a numerical index comprised of supply, demand, and adaptive capacity indicators, including an innovative way to account for the importance of having diverse supply sources. We demonstrate the application of this framework to the Hetch Hetchy Regional Water System in the San Francisco Bay Area of California. Our analyses demonstrate that water agencies that share common water supplies are in a good position to establish integrative regional management partnerships in order to achieve individual and collective short-term and long-term benefits.

  16. Hydrogen use projections and supply options

    NASA Technical Reports Server (NTRS)

    Manvi, R.; Fujita, T.

    1976-01-01

    Reference and expanded use projections were developed to estimate future hydrogen demand. The rationale in the development of these projections, which estimate the growth of hydrogen usage of approximately 1 X 10 to the fifteenth power Btu in 1973 to approximately 5.5 X 10 to the fifteenth power for reference use and 22 X 10 to the fifteenth power Btu for expanded use projections in year 2000. Primary energy sources required to produce these demands are discussed in the light of transition from a low merchant to high merchant supply option.

  17. 78 FR 13330 - Pangea LNG (North America) Holdings, LLC; Application for Long-Term Authorization To Export...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ..., of pipeline- quality natural gas. Pangea states that such gas will be delivered to the ST LNG Project... systems \\4\\ via the South Texas Pipeline, thereby allowing natural gas to be supplied through displacement... the siting, construction, and operation of an affiliated natural gas pipeline that will bring feed gas...

  18. CSPD Technical Manual: Procedures for Comprehensive Assessment of Educational Personnel Supply/Demand. 1990 Edition.

    ERIC Educational Resources Information Center

    Lauritzen, Paul; Friedman, Stephen

    This manual presents procedures for collecting data to project personnel needs in the field of special education, addressing in part the Comprehensive System of Personnel Development requirements of Public Law 94-142. Implementation of the procedures identifies: areas of education that show need for additional teachers as well as areas of surplus;…

  19. Gendered Small-Business Assistance: Lessons from a Swedish Project

    ERIC Educational Resources Information Center

    Tillmar, Malin

    2007-01-01

    Purpose: The purpose of this paper is to deal with the design of small-business training programs and focuses on women business owners, their real needs and the supply of adequate training. How and to what extent are client selection and support needs influenced by the gender system? Design/methodology/approach: An in-depth study of an ambitious…

  20. Satellite irrigation management support with the terrestrial observation and prediction system: A framework for integration of satellite & surface observations to support improvements in agricultural water resource management

    USDA-ARS?s Scientific Manuscript database

    In California and other regions vulnerable to water shortages, satellite-derived estimates of key hydrologic parameters can support agricultural producers and water managers in maximizing the benefits of available water supplies. The Satellite Irrigation Management Support (SIMS) project combines N...

  1. 76 FR 31954 - San Jose Water Company; Notice of Declaration of Intention and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ...: Thomas J. Victorine, Director of Operations, San Jose Water Company, 110 W. Santa Clara Street, San Jose... system. The water supplied to the water treatment plant comes from three existing storage reservoirs. A... generating capacity, or have otherwise significantly modified the project's pre-1935 design or operation. l...

  2. 7 CFR 1710.302 - Financial forecasts-power supply borrowers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... facilities; (3) Provide an in-depth analysis of the regional markets for power if loan feasibility depends to any degree on a borrower's ability to sell surplus power while its system loads grow to meet the... sensitivity analysis if required by RUS pursuant to § 1710.300(d)(5). (e) The projections shall be coordinated...

  3. Arsenic and Nitrate Removal from Drinking Water by Ion Exchange U.S. EPA Demonstration Project at Vale, OR - Final Performance Evaluation Report

    EPA Science Inventory

    As part of the EPA Arsenic Removal Technology Demonstration Program, a 540-gal/min (gpm) ion exchange (IX) system proposed by Kinetico was selected for demonstration at Vale, OR to remove arsenic and nitrate from a groundwater supply to meet their respective maximum contaminant l...

  4. Evaluating a biomass resource: The TVA region-wide biomass resource assessment model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Downing, M.; Graham, R.L.

    1993-12-31

    The economic and supply structures of short rotation woody crop (SRWC) markets have not been established. Establishing the likely price and supply of SRWC biomass in a region is a complex task because biomass is not an established commodity as are oil, natural gas and coal. In this study we project the cost and supply of short-rotation woody biomass for the TVA region -- a 276 county area that includes all of Tennessee and portions of 10 contiguous states in the southeastern United States. Projected prices and quantities of SRWC are assumed to be a function of the amount andmore » quality of crop and pasture land available in a region, expected SRWC yields and production costs on differing soils and land types, and the profit that could be obtained from current conventional crop production on these same lands. Results include the supply curve of SRWC biomass that is projected to be available from the entire region, the amount and location of crop and pasture land that would be used, and the conventional agricultural crops that would be displaced as a function of SRWC production. Finally, we show the results of sensitivity analysis on the projected cost and supply of SRWC biomass. In particular, we examine the separate impacts of varying SRWC production yields.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doug Cathro

    The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas andmore » Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.« less

  6. Hawaiian Electric Advanced Inverter Grid Support Function Laboratory Validation and Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Austin; Nagarajan, Adarsh; Prabakar, Kumar

    The objective for this test plan was to better understand how to utilize the performance capabilities of advanced inverter functions to allow the interconnection of distributed energy resource (DER) systems to support the new Customer Self-Supply, Customer Grid-Supply, and other future DER programs. The purpose of this project was: 1) to characterize how the tested grid supportive inverters performed the functions of interest, 2) to evaluate the grid supportive inverters in an environment that emulates the dynamics of O'ahu's electrical distribution system, and 3) to gain insight into the benefits of the grid support functions on selected O'ahu island distributionmore » feeders. These goals were achieved through laboratory testing of photovoltaic inverters, including power hardware-in-the-loop testing.« less

  7. Projections of Science and Engineering Doctorate Supply and Utilization 1982 and 1987.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC. Div. of Science Resources Studies.

    This report represents the National Science Foundation's fourth projection analysis of science and engineering doctorate supply and utilization through 1987. The 1979 study incorporates the effect of the domestic market for highly trained science and engineering (S/E) personnel upon the numbers of S/E doctorates awarded by American universities.…

  8. 78 FR 63176 - Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... new ``y'' pipe intake off the existing 10-inch diameter water supply pipeline; (2) a new 12-foot-long... water supply pipeline; and (5) appurtenant facilities. The proposed project would have an estimated... 22 kW Orchard City Water Treatment Plant Hydroelectric Project would utilize Orchard City's water...

  9. Service-Learning in Supply Chain Management: Benefits, Challenges and Best Practices

    ERIC Educational Resources Information Center

    Schoenherr, Tobias

    2015-01-01

    Service-learning (SL) is a pedagogical approach in which students are assigned a course-related project in a not-for-profit organization, and are tasked to apply course content to execute the project. While the benefits are multifarious, only recently have supply chain management (SCM) courses adapted this innovative teaching methodology. The…

  10. IMP 7 (Explorer 47) trajectory, September 26, 1972 to September 25, 1978

    NASA Technical Reports Server (NTRS)

    Milligan, Pamela A.; Lazarus, Alan J.

    1988-01-01

    The trajectory plots for IMP 7 (Explorer 47) are contained. For each orbit the trajectory is shown in five panels on two pages; each panel is a different representation or projection. The trajectory parameters were obtained from the multi-coordinate ephemeris (MCE) tapes supplied to IMP experimenters by the IMP project. The plots on the right hand pages use a geocentric, solar-ecliptic coordinate system. Distances are in units of earth radii. The plots on the left hand pages use geocentric, solar magnetospheric coordinates with distances in earth radii.

  11. Low carbon logistics through supply chain design and coordination.

    DOT National Transportation Integrated Search

    2010-02-01

    "In this project, we propose to address carbon emissions in logistics through supply chain design, planning and : coordination. We argue that (1) supply chain design, planning, and coordination can help reduce carbon emissions : significantly, (2) su...

  12. Planning water supply under uncertainty - benefits and limitations of RDM, Info-Gap, economic optimization and many-objective optimization

    NASA Astrophysics Data System (ADS)

    Matrosov, E.; Padula, S.; Huskova, I.; Harou, J. J.

    2012-12-01

    Population growth and the threat of drier or changed climates are likely to increase water scarcity world-wide. A combination of demand management (water conservation) and new supply infrastructure is often needed to meet future projected demands. In this case system planners must decide what to implement, when and at what capacity. Choices can range from infrastructure to policies or a mix of the two, culminating in a complex planning problem. Decision making under uncertainty frameworks can be used to help planners with this planning problem. This presentation introduces, applies and compares four decision making under uncertainty frameworks. The application is to the Thames basin water resource system which includes the city of London. The approaches covered here include least-economic cost capacity expansion optimization (EO), Robust Decision Making (RDM), Info-Gap Decision Theory (Info-gap) and many-objective evolutionary optimization (MOEO). EO searches for the least-economic cost program, i.e. the timing, sizing, and choice of supply-demand management actions/upgrades which meet projected water demands. Instead of striving for optimality, the RDM and Info-gap approaches help build plans that are robust to 'deep' uncertainty in future conditions. The MOEO framework considers multiple performance criteria and uses water systems simulators as a function evaluator for the evolutionary algorithm. Visualizations show Pareto approximate tradeoffs between multiple objectives. In this presentation we detail the application of each framework to the Thames basin (including London) water resource planning problem. Supply and demand options are proposed by the major water companies in the basin. We apply the EO method using a 29 year time horizon and an annual time step considering capital, operating (fixed and variable), social and environmental costs. The method considers all plausible combinations of supply and conservation schemes and capacities proposed by water companies and generates the least-economic cost annual plan. The RDM application uses stochastic simulation under a weekly time-step and regret analysis to choose a candidate strategy. We then use a statistical cluster algorithm to identify future states of the world under which the strategy is vulnerable. The method explicitly considers the effects of uncertainty in supply, demands and energy price on multiple performance criteria. The Info-gap approach produces robustness and opportuneness plots that show the performance of different plans under the most dire and favorable sets of future conditions. The same simulator, supply and demand options and uncertainties are considered as in the RDM application. The MOEO application considers many more combinations of supply and demand options while still employing a simulator that enables a more realistic representation of the physical system and operating rules. A computer cluster is employed to ease the computational burden. Visualization software allows decision makers to interactively view tradeoffs in many dimensions. Benefits and limitations of each framework are discussed and recommendations for future planning in the basin are provided.

  13. Solar project description for Loyola University-Biever Hall men's dormitory, New Orleans, Louisiana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-07-10

    The Loyola University solar energy system, located in New Orleans, Louisiana, preheats approximately 9000 gallons of domestic hot water (DHW) each day to Biever Hall Dormitory. Biever Hall is a six-story dormitory that houses 420 students. The system is designed to supply 140/sup 0/F water to bathrooms, showers, and eight washing machines. The solar energy system has 15 arrays of flat-plate collectors with a gross area of 4590 square feet. The system is an open loop system which uses potable water as both the collector fluid and storage medium. City water is preheated by flat plate collectors on the roofmore » and stored in a 5000 gallon tank located on the west side of the building at ground level. Upon demand the preheated water is transported to two existing 1500 gallon hot water tanks. Auxiliary energy is supplied by a central heating plant via a high temperature/high pressure line.« less

  14. A reliable data collection/control system

    NASA Technical Reports Server (NTRS)

    Maughan, Thom

    1988-01-01

    The Cal Poly Space Project requires a data collection/control system which must be able to reliably record temperature, pressure and vibration data. It must also schedule the 16 electroplating and 2 immiscible alloy experiments so as to optimize use of the batteries, maintain a safe package temperature profile, and run the experiment during conditions of microgravity (and minimum vibration). This system must operate unattended in the harsh environment of space and consume very little power due to limited battery supply. The design of a system which meets these requirements is addressed.

  15. Full-scale system impact analysis: Digital document storage project

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Digital Document Storage Full Scale System can provide cost effective electronic document storage, retrieval, hard copy reproduction, and remote access for users of NASA Technical Reports. The desired functionality of the DDS system is highly dependent on the assumed requirements for remote access used in this Impact Analysis. It is highly recommended that NASA proceed with a phased, communications requirement analysis to ensure that adequate communications service can be supplied at a reasonable cost in order to validate recent working assumptions upon which the success of the DDS Full Scale System is dependent.

  16. Performance of 350kW concentrating photovoltaic power system after two years

    NASA Astrophysics Data System (ADS)

    Khoshaim, B.; Huraib, F.; Al-Sani, A.; Salim, A.

    This paper summarizes the continuing performance of the world's largest concentrating Photovoltaic Power System (PVPS) which began supplying electrical power to the three remote villages in Saudi Arabia in September 1981. The paper reviews the system performance to date and concentrates mainly on the performance of the most important part of the PVPS that is the photovoltaic array field. Problems and failures experienced with the system so far are reviewed and analyzed. Also, a brief history of the project including its design features is given in this paper.

  17. Space Station Environmental Health System water quality monitoring

    NASA Technical Reports Server (NTRS)

    Vincze, Johanna E.; Sauer, Richard L.

    1990-01-01

    One of the unique aspects of the Space Station is that it will be a totally encapsulated environment and the air and water supplies will be reclaimed for reuse. The Environmental Health System, a subsystem of CHeCS (Crew Health Care System), must monitor the air and water on board the Space Station Freedom to verify that the quality is adequate for crew safety. Specifically, the Water Quality Subsystem will analyze the potable and hygiene water supplies regularly for organic, inorganic, particulate, and microbial contamination. The equipment selected to perform these analyses will be commercially available instruments which will be converted for use on board the Space Station Freedom. Therefore, the commercial hardware will be analyzed to identify the gravity dependent functions and modified to eliminate them. The selection, analysis, and conversion of the off-the-shelf equipment for monitoring the Space Station reclaimed water creates a challenging project for the Water Quality engineers and scientists.

  18. Progress in the blood supply of Afghanistan.

    PubMed

    Riley, William J; McCullough, Terri Konstenius; Rhamani, Ahmad Masoud; McCullough, Jeffrey

    2017-07-01

    The blood supply system in Afghanistan was badly damaged by years of conflict. In 2009, the Afghanistan National Blood Safety and Transfusion Service (ANBSTS) was established. For 6 years, we collaborated to assist with policy and infrastructure development; blood bank operations; blood collection, testing, and component production; transfusion practices; and training of technicians, nurses, midwives, and physicians. Policies were established, infrastructure was strengthened, and capable staff was acquired and trained. Standard operating procedures were developed, testing was improved, and quality systems were established. Thirty trainings were held for blood center staff. Four additional formal trainings were held for 39 physicians, 36 nurses and/or midwives, and 38 laboratory technicians. During 5 years of this project, blood collection increased by 40%. The ANBSTS has made impressive progress developing infrastructure, personnel, procedures, quality systems, and training programs and increasing blood collection. Knowledge of transfusion medicine was improved through structured training. © 2017 AABB.

  19. A translator writing system for microcomputer high-level languages and assemblers

    NASA Technical Reports Server (NTRS)

    Collins, W. R.; Knight, J. C.; Noonan, R. E.

    1980-01-01

    In order to implement high level languages whenever possible, a translator writing system of advanced design was developed. It is intended for routine production use by many programmers working on different projects. As well as a fairly conventional parser generator, it includes a system for the rapid generation of table driven code generators. The parser generator was developed from a prototype version. The translator writing system includes various tools for the management of the source text of a compiler under construction. In addition, it supplies various default source code sections so that its output is always compilable and executable. The system thereby encourages iterative enhancement as a development methodology by ensuring an executable program from the earliest stages of a compiler development project. The translator writing system includes PASCAL/48 compiler, three assemblers, and two compilers for a subset of HAL/S.

  20. Impact of rural water projects on hygienic behaviour in Swaziland

    NASA Astrophysics Data System (ADS)

    Peter, Graciana

    In Swaziland, access to safe water supply and sanitation has improved significantly and was expected to result in improved health and, in particular, reduced infant mortality rates. On the contrary, mortality rates in the under 5 years age group are high and have doubled from 60 in 1996, to 120 deaths per 1000 in 2006. The main objective of the study was to assess whether the water projects permit, and are accompanied by, changes in hygienic behaviour to prevent transmission of diseases. The study area was Phonjwane, located in the dry Lowveld of Swaziland, where water projects play a significant role in meeting domestic water demands. Hygienic behaviour and sanitation facilities were analysed and compared before and after project. The results of the study show that domestic water supply projects have significantly reduced distances travelled and time taken to collect water, and that increased quantities of water are collected and used. While the majority of respondents (95.6%) used the domestic water project source, the quantities allowed per household (125 l which translates to an average of 20.8 l per person) were insufficient and therefore were supplemented with harvested rainwater (57.8%), water from a polluted river (17.8%), and water from a dam (2.2%). Increased water quantities have permitted more baths and washing of clothes and hands, but significant proportions of the population still skip hygienic practices such as keeping water for washing hands inside or near toilet facilities (40%) and washing hands (20%). The study concludes that the water supply project has permitted and improved hygienic practices but not sufficiently. The health benefits of safe domestic water supplies are hampered by insufficient quantities of water availed through the projects, possible contamination of the water in the house, poor hygienic behaviours and lack of appropriate sanitation measures by some households. There is a need to provide sufficient quantities of safe water to meet all domestic demands. Domestic water supply must be accompanied by appropriate sanitation and hygienic education.

  1. A Hybrid LCC-VSC HVDC Transmission System Supplying a Passive Load

    NASA Astrophysics Data System (ADS)

    Kotb, Omar

    High Voltage Direct Current (HVDC) transmission systems continue to be an excellent asset in modern power systems, mainly for their ability to overcome the problems of AC transmission, such as the interconnection of asynchronous grids, stability of long transmission lines, and use of long cables for power transmission. In the past 20 years, Voltage Source Converter (VSC)-HVDC transmission systems were developed and installed in many projects, thereby adding more operational benefits to DC transmission option, such as high controllability, ability to supply weak networks, and reduced converter reactive power demand. Nevertheless, VSC-HVDC transmission suffers from the disadvantages of high losses and cost. In this research, a hybrid HVDC employing a Line Commutated Converter (LCC) as rectifier and a VSC as inverter is used to supply a passive network through a DC cable. The hybrid system is best suited for unidirectional power transmission scenarios, such as power transmission to islands and remote load centers, where the construction of new transmission lines is prohibitively expensive. Control modes for the rectifier and inverter are selected and implemented using Proportional Integral (PI) controllers. Special control schemes are developed for abnormal operating conditions such as starting at light load and recovering from AC network faults. The system performance under steady state and transient conditions is investigated by EMTP-RV simulations. The results show the feasibility of the hybrid system.

  2. [Research on ecological population capacity based on food and water in Shandong province].

    PubMed

    Lin, C

    1991-02-01

    The population carrying capacity in Shandong Province, China, based on current food production and water supply is discusses. In 1988, the staple food production exceeded the amount needed for the minimum subsistence level of 300 kg/person. But if the food supply were to be kept at 500 kilos/person, the amount considered to be abundant, the province had a surplus population of 16.11 million. Based on a population projection of medium scenario, the projected level of food production would meet the needs for adequate food consumption. But if the level of abundant supply were to be kept, there would be 12.4 million surplus population. The shortage of water supply is a more acute problem. On the basis of the current water consumption of 514 cubic m/person, the water supply of the province could only meet the needs of 44.9 million. But the population in the province was already 80.6 million in 1988. If the water consumption was 1000 cubic m/person, which was the consumption level of the Soviet Union, the supply can only meet the needs of 23 million population. Even if the potential water resources were fully developed, the supply can only meet the needs of 65.4 million people at the end of the century. The 92.5 million projected population at the time would far exceed the water supply capacity. The severe shortage of water supply of the province would be the most serious ecological problem. Such constraint may also have considerable impact on the sustained socioeconomic development of the province.

  3. Framework to Define Structure and Boundaries of Complex Health Intervention Systems: The ALERT Project

    PubMed Central

    Boriani, Elena; Esposito, Roberto; Frazzoli, Chiara; Fantke, Peter; Hald, Tine; Rüegg, Simon R.

    2017-01-01

    Health intervention systems are complex and subject to multiple variables in different phases of implementation. This constitutes a concrete challenge for the application of translational science in real life. Complex systems as health-oriented interventions call for interdisciplinary approaches with carefully defined system boundaries. Exploring individual components of such systems from different viewpoints gives a wide overview and helps to understand the elements and the relationships that drive actions and consequences within the system. In this study, we present an application and assessment of a framework with focus on systems and system boundaries of interdisciplinary projects. As an example on how to apply our framework, we analyzed ALERT [an integrated sensors and biosensors’ system (BEST) aimed at monitoring the quality, health, and traceability of the chain of the bovine milk], a multidisciplinary and interdisciplinary project based on the application of measurable biomarkers at strategic points of the milk chain for improved food security (including safety), human, and ecosystem health (1). In fact, the European food safety framework calls for science-based support to the primary producers’ mandate for legal, scientific, and ethical responsibility in food supply. Because of its multidisciplinary and interdisciplinary approach involving human, animal, and ecosystem health, ALERT can be considered as a One Health project. Within the ALERT context, we identified the need to take into account the main actors, interactions, and relationships of stakeholders to depict a simplified skeleton of the system. The framework can provide elements to highlight how and where to improve the project development when project evaluations are required. PMID:28804707

  4. Framework to Define Structure and Boundaries of Complex Health Intervention Systems: The ALERT Project.

    PubMed

    Boriani, Elena; Esposito, Roberto; Frazzoli, Chiara; Fantke, Peter; Hald, Tine; Rüegg, Simon R

    2017-01-01

    Health intervention systems are complex and subject to multiple variables in different phases of implementation. This constitutes a concrete challenge for the application of translational science in real life. Complex systems as health-oriented interventions call for interdisciplinary approaches with carefully defined system boundaries. Exploring individual components of such systems from different viewpoints gives a wide overview and helps to understand the elements and the relationships that drive actions and consequences within the system. In this study, we present an application and assessment of a framework with focus on systems and system boundaries of interdisciplinary projects. As an example on how to apply our framework, we analyzed ALERT [an integrated sensors and biosensors' system (BEST) aimed at monitoring the quality, health, and traceability of the chain of the bovine milk], a multidisciplinary and interdisciplinary project based on the application of measurable biomarkers at strategic points of the milk chain for improved food security (including safety), human, and ecosystem health (1). In fact, the European food safety framework calls for science-based support to the primary producers' mandate for legal, scientific, and ethical responsibility in food supply. Because of its multidisciplinary and interdisciplinary approach involving human, animal, and ecosystem health, ALERT can be considered as a One Health project. Within the ALERT context, we identified the need to take into account the main actors, interactions, and relationships of stakeholders to depict a simplified skeleton of the system. The framework can provide elements to highlight how and where to improve the project development when project evaluations are required.

  5. 25 CFR 137.1 - Water supply.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Water supply. 137.1 Section 137.1 Indians BUREAU OF... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.1 Water supply. The engineering report dealt with in... capacity of the San Carlos reservoir created by the Coolidge Dam and the water supply therefor over a...

  6. 25 CFR 137.1 - Water supply.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Water supply. 137.1 Section 137.1 Indians BUREAU OF... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.1 Water supply. The engineering report dealt with in... capacity of the San Carlos reservoir created by the Coolidge Dam and the water supply therefor over a...

  7. 25 CFR 137.1 - Water supply.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Water supply. 137.1 Section 137.1 Indians BUREAU OF... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.1 Water supply. The engineering report dealt with in... capacity of the San Carlos reservoir created by the Coolidge Dam and the water supply therefor over a...

  8. 25 CFR 137.1 - Water supply.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Water supply. 137.1 Section 137.1 Indians BUREAU OF... CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.1 Water supply. The engineering report dealt with in... capacity of the San Carlos reservoir created by the Coolidge Dam and the water supply therefor over a...

  9. 25 CFR 137.1 - Water supply.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Water supply. 137.1 Section 137.1 Indians BUREAU OF INDIAN... INDIAN IRRIGATION PROJECT, ARIZONA § 137.1 Water supply. The engineering report dealt with in section 1... of the San Carlos reservoir created by the Coolidge Dam and the water supply therefor over a period...

  10. Cooperation between Japanese and Cambodian Dietitians in Setting up a Hospital Diet Management System.

    PubMed

    Ly, Koung Ry; Saito, Shino; Kusama, Kaoru

    2015-01-01

    Cambodia faces a considerably high percentage of the stunted under 5 (Unicef, 2014). Despite the National Nutrition Strategy Launched by the Ministry of Health in cooperation with development partners, nutrition improvement projects have not always been effective. It is generally said these issues are addressed in many other developing nations, and the literature largely documented that successful nutrition programmes are community-based programmes because of their sustainability and the intensive communications between health workers and beneficiaries. Learning from the past experiences, the Foundation for International Development/Relief organized a project team with a Cambodian dietitian and an experienced Japanese dietitian to implement a hospital diet programme for children from April 2006 to March 2014 in the National Pediatric Hospital (NPH) in Cambodia. The project has two objectives: establishing a hospital diet management system, and developing the capacity of NPH staff. Hospital food menus were created paying particular attention to Cambodian culture, eating habits and accessibility to the ingredients for the purpose of continuous supply. We have also put emphasis on the communication between dietitians and family members of the children to let them understand the importance of a nutritious diet. After 8 y of project implementation, the hospital diet management system was established providing 7 types of menu with nutritious diets. The final evaluation of the project showed that NPH staff have the intention to continue hospital food supply with their acquired knowledge and capacity. In practice, a Cambodian dietitian currently takes the initiative for a continuous nutritional diet in NPH. The key to this success is the collaboration between Japanese dietitians with experience and Cambodian dietitians with knowledge of Cambodian eating habits. Taking our experience into account, it is highly recommended to educate Cambodian dietitians, as they are extremely scarce, and to increase the awareness of health care staff towards the importance of nutrition management.

  11. 14. Implementation, execution, and completion of projects.

    PubMed

    2014-05-01

    Once an intervention has been selected for implementation, it becomes a project. Implementation of a project is a complex process and requires completion of a host of tasks. The implementation process has been deconstructed into its components so that it can be analysed and evaluated. A prerequisite for implementation is an operational plan. The tasks that require completion include: (1) reassessing current status and verifying the needs; (2) activating the operational plan; (3) setting-up and operating an administrative structure; (4) identifying, acquiring, and organising resources (including human resources); (5) assigning roles and responsibilities; (6) educating and training personnel (including mission-specific); (7) briefing staff; (8) preparing/readying resources for transport; (9) assuring project self-sufficiency; (10) arranging for personal necessities; (11) ensuring the safety of personnel and the security of equipment and supplies; (12) insuring personnel; (13) coordinating with other projects/actors; (14) coordinating with other BSF systems (role of the coordination and control centre); (15) communicating with community leaders; (16) initiating the use of standardised progress reports; (17) deploying personnel, equipment, and supplies; (18) initiating the intervention(s); (19) executing the intervention(s); (20) reporting start of interventions; (21) completing the project; and (22) completing and submitting a formal report. This deconstruction is essential in order to study the process and identify critical points of success and failure. It also is recognised that many interventions consist of many components (subfunctions), each of which may be considered a production process.

  12. Pharmaceutical sales of pseudoephedrine: the impact of electronic tracking systems on methamphetamine crime incidents.

    PubMed

    Mazerolle, Lorraine; McGuffog, Ingrid; Ferris, Jason; Chamlin, Mitchell B

    2017-03-01

    Electronic tracking systems (ETS) are used extensively in pharmacies across the United States and Australia to control suspicious sales of pseudoephedrine. This study measures the impact of one ETS-Project STOP-on the capacity of police to reduce production, supply and possession of methamphetamine. Using official police data of incidents of production, supply and possession from January 1996 to December 2011 (n = 192 data points/months over 16 years), we used a quasi-experimental, time-series approach. The State of Queensland, Australia. No individual participants are included in the study. The unit of analysis is reported police incidents. The study examines the impact of the ETS on production (n = 5938 incidents), drug supply and trafficking (n = 20 094 incidents) and drug possession or use (n = 118 926) of methamphetamine. Introduction of the ETS in November 2005 was associated with an insignificant decrease (P = 0.15) in the production of methamphetamine. The intervention was associated with a statistically significant increase in supply incidents (P = 0.0001). There was no statistically significant effect on the incidence of possession (P = 0.59). Electronic tracking systems can reduce the capacity of people to produce methamphetamine domestically, but seem unlikely to affect other aspects of the methamphetamine problem such as possession, distribution and importation. © 2016 Society for the Study of Addiction.

  13. Integrating seismic-reflection and sequence-stratigraphic methods to characterize the hydrogeology of the Floridan aquifer system in southeast Florida

    USGS Publications Warehouse

    Cunningham, Kevin J.

    2013-01-01

    The Floridan aquifer system (FAS) is receiving increased attention as a result of regulatory restrictions on water-supply withdrawals and treated wastewater management practices. The South Florida Water Management District’s Regional Water Availability Rule, adopted in 2007, restricts urban withdrawals from the shallower Biscayne aquifer to pre-April 2006 levels throughout southeast Florida. Legislation adopted by the State of Florida requires elimination of ocean outfalls of treated wastewater by 2025. These restrictions have necessitated the use of the more deeply buried FAS as an alternate water resource to meet projected water-supply shortfalls, and as a repository for the disposal of wastewater via Class I deep injection wells and injection of reclaimed water. Some resource managers in Broward County have expressed concern regarding the viability of the FAS as an alternative water supply due to a lack of technical data and information regarding its long-term sustainability. Sustainable development and management of the FAS for water supply is uncertain because of the potential risk posed by structural geologic anomalies (faults, fractures, and karst collapse structures) and knowledge gaps in the stratigraphy of the system. The integration of seismic-reflection and borehole data into an improved geologic and hydrogeologic framework will provide a better understanding of the structural and stratigraphic features that influence groundwater flow and contaminant transport.

  14. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    PubMed

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  15. Relating Climate Change Risks to Water Supply Planning Assumptions: Recent Applications by the U.S. Bureau of Reclamation (Invited)

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.

    2009-12-01

    Presentation highlights recent methods carried by Reclamation to incorporate climate change and variability information into water supply assumptions for longer-term planning. Presentation also highlights limitations of these methods, and possible method adjustments that might be made to address these limitations. Reclamation was established more than one hundred years ago with a mission centered on the construction of irrigation and hydropower projects in the Western United States. Reclamation’s mission has evolved since its creation to include other activities, including municipal and industrial water supply projects, ecosystem restoration, and the protection and management of water supplies. Reclamation continues to explore ways to better address mission objectives, often considering proposals to develop new infrastructure and/or modify long-term criteria for operations. Such studies typically feature operations analysis to disclose benefits and effects of a given proposal, which are sensitive to assumptions made about future water supplies, water demands, and operating constraints. Development of these assumptions requires consideration to more fundamental future drivers such as land use, demographics, and climate. On the matter of establishing planning assumptions for water supplies under climate change, Reclamation has applied several methods. This presentation highlights two activities where the first focuses on potential changes in hydroclimate frequencies and the second focuses on potential changes in hydroclimate period-statistics. The first activity took place in the Colorado River Basin where there was interest in the interarrival possibilities of drought and surplus events of varying severity relevant to proposals on new criteria for handling lower basin shortages. The second activity occurred in California’s Central Valley where stakeholders were interested in how projected climate change possibilities translated into changes in hydrologic and water supply statistics relevant to a long-term federal Endangered Species Act consultation. Projected climate change possibilities were characterized by surveying a large ensemble of climate projections for change in period climate-statistics and then selecting a small set of projections featuring a bracketing set of period-changes relative to the those from the complete ensemble. Although both methods served the needs of their respective planning activities, each has limited applicability for other planning activities. First, each method addresses only one climate change aspect and not the other. Some planning activities may need to consider potential changes in both period-statistics and frequencies. Second, neither method addresses CMIP3 projected changes in climate variability. The first method bases frequency possibilities on historical information while the second method only surveys CMIP3 projections for change in period-mean and then superimposes those changes on historical variability. Third, artifacts of CMIP3 design lead to interpretation challenges when implementing the second method (e.g., inconsistent projection initialization, model-dependent expressions of multi-decadal variability). Presentation summarizes these issues and also potential method adjustments to address them when defining planning assumptions for water supplies.

  16. Global Tungsten Demand and Supply Forecast

    NASA Astrophysics Data System (ADS)

    Dvořáček, Jaroslav; Sousedíková, Radmila; Vrátný, Tomáš; Jureková, Zdenka

    2017-03-01

    An estimate of the world tungsten demand and supply until 2018 has been made. The figures were obtained by extrapolating from past trends of tungsten production from1905, and its demand from 1964. In addition, estimate suggestions of major production and investment companies were taken into account with regard to implementations of new projects for mining of tungsten or possible termination of its standing extraction. It can be assumed that tungsten supply will match demand by 2018. This suggestion is conditioned by successful implementation of new tungsten extraction projects, and full application of tungsten recycling methods.

  17. 75 FR 26709 - Clarke County Water Supply Project, Clarke County, IA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... Project, Clarke County, IA AGENCY: Natural Resources Conservation Service. ACTION: Notice of intent to... Conservationist for Planning, 210 Walnut Street, Room 693, Des Moines, IA 50309-2180, telephone: 515-284- 4769... available at the Iowa NRCS Web site at http://www.ia.nrcs.usda.gov . A map of the Clarke County Water Supply...

  18. Enhancing Chinese Agribusiness Supply Chains with Internet Technologies: A Transnational Knowledge Transfer Approach

    ERIC Educational Resources Information Center

    Duan, Yanqing; Bentley, Yongmei; Fu, Zetian; Zografos, Konstantinos; Bemeleit, Boris

    2008-01-01

    This paper reports research findings from a project funded by the European Commission. The research used case studies and surveys to identify gaps between Europe and China in the level of Internet adoption in fresh-produce supply chains. The project reveals barriers to Internet adoption in China in this industry, and employs a transnational…

  19. The Study of Impacts of Water Transferring From Wet Regions To Dry Regions In Iran

    NASA Astrophysics Data System (ADS)

    Motiee-Homayoun, Dr.; Ghomashchi, Dr.

    Iran, with a very diverse ecology and different climate has been classified as a dry- semidry region. Iran's annual average of rain-fall is about 250 mm, while this figure is more than 1000 mm in north and less than 100 mm in the south of the country. Overall, Iran's water resources are low. Rapid population growth, economic growth together with significant urban development, in recent decades, has led to underestimate high demands for water. Therefore, water shortage has been considered more obviously. Such an important scare is rather serious in central and eastern regions of the country. This problem has been determined as a serious challenge for Iran's government and national water authorities, in particular. Although, drinking water supply is only 6 percent of total water resources, due to direct socio-political impacts, drinking water supply, in both quality and quantity, is more serious and important than agricultural water demands. Accordingly, for the following reasons: 1) Desperation and diversity of geographical conditions of urban areas 2) Low access to underground water 3) Inadequate quality surface water supply Difficulties and the costs of supplying urban water in Iran have been sharply increased. Presently, due to unconstrained consuming underground water and negative balance in most under ground resources of the country, more specifically in central and eastern regions, water supply from groundwater resources is very risky and misleading. Furthermore, other reason such as rapid urban population growth and changes in people's every day life and their consumption patterns increase both water consumption and waste water in the circumstances of inadequate sewage systems, make a vast source of pollution for water resources. Due to the influence of extended See (Salty) water, in southern provinces, near to Persian Gulf, accessibility to fresh water is rather difficult and in many cases only after tens of kilometers far from the see, fresh water could be available. In this situation, water transformation from wet areas (with good water resources) to dried and desert regions of the country has been identified as a necessary and reasonable policy to tacklewater shortage. Mediterain climate and mountains in north, west and southwest regions of Iran grant a benefit of high level rate of rainfall, several deep and long rivers, and large capacity of groundwater resources in these areas. Existence of such rivers and water resources, especially a big river of Karoon in southwest, strengthens the goal of constructing hydraulic structures in order to transfer water fro m wet areas to central and eastern areas of the country. This goal has led to planning and implementing of several large and high cost projects. Experts of water affairs, believe that although drinking water supply is one of the most crucial missions of the government, it should also be noted that transformation huge amount of water from an area to another area, with a very long distant, undoubtedly, will cause significant environmental impacts in future. Therefore, decision making and implementing such strategic projects needs a very precise consideration and accurate cost-benefit analyzes. On the one hand, through a socio- economic approach, implementation of such big projects for water transferring requires a great amount of investment and a long period to complete, and benefit peoples. So in many cases multi-purpose and multi- dimensional projects should be considered carefully. On the other hand, water supply for some provinces is vital. In most identified areas, water scarcity is the main cause of urban decline, economic problems and finally loosing population because of emigration. Thus, fresh water should be supplied for these provinces at the earliest possible. This paper is an attempt to identify, define and explain the characteristics and specification of all projects for transferring in different parts of Iran. Generally, advantages and disadvantages of these projects concerning economic and environmental impacts will be clarified. For instance, taking water from Karoon River and transferring to central region of country has changed the percentage of its quality in seashore and effect ecology of seaside and coastal areas. The importance of these projects will be more obvious, when people's demands, in dried regions, increase rapidly. Recently, this matter has passed internal border of the country, considering water transferring to other countries in Persian Gulf such as Kuwait and Qatar. Key words: water supply ­ transferring system ­ Iran ­ water shortage

  20. Optimal crop selection and water allocation under limited water supply in irrigation

    NASA Astrophysics Data System (ADS)

    Stange, Peter; Grießbach, Ulrike; Schütze, Niels

    2015-04-01

    Due to climate change, extreme weather conditions such as droughts may have an increasing impact on irrigated agriculture. To cope with limited water resources in irrigation systems, a new decision support framework is developed which focuses on an integrated management of both irrigation water supply and demand at the same time. For modeling the regional water demand, local (and site-specific) water demand functions are used which are derived from optimized agronomic response on farms scale. To account for climate variability the agronomic response is represented by stochastic crop water production functions (SCWPF). These functions take into account different soil types, crops and stochastically generated climate scenarios. The SCWPF's are used to compute the water demand considering different conditions, e.g., variable and fixed costs. This generic approach enables the consideration of both multiple crops at farm scale as well as of the aggregated response to water pricing at a regional scale for full and deficit irrigation systems. Within the SAPHIR (SAxonian Platform for High Performance IRrigation) project a prototype of a decision support system is developed which helps to evaluate combined water supply and demand management policies.

  1. Coupling Power Generation, Geologic CO2 Storage and Saline Groundwater Desalination to Address Growing Energy Needs in Water Constrained Regions

    NASA Astrophysics Data System (ADS)

    Davidson, C. L.; Wurstner, S. K.; Fortson, L. A.

    2010-12-01

    As humanity works to both minimize climate change and adapt to its early impacts, co-management of energy and water resources will become increasingly important. In some parts of the US, power plants have been denied permits, in part because of the significant burden placed on local water supplies by assigning new water rights for the facility’s entire design life. Water resources may be allocated 30 to 50 years into a future where water availability and quality are uncertain due to supply impacts associated with climate change and increased demand from growing populations, agriculture and industry. In many areas, particularly those with access to seawater, desalination is being employed with increasing frequency to augment conventional sources of fresh water. At the same time, many of the world’s developed nations are moving to reduce greenhouse gas emissions. One key technological option for addressing emissions from the power generation sector is CO2 capture and geologic storage (CCS). This process is both water and energy intensive for many power and industrial facilities, compounding the impact of declining water availability for plants faced with deploying CCS in a CO2-constrained future. However, a unique opportunity may exist to couple power generation and CCS by extracting and desalinating brine from the CO2 storage formation to produce fresh water. While this coupled approach is unlikely to be attractive for most CCS projects, it may represent a viable option in areas where there is demand for additional electricity but conventional water supplies are unable to meet the needs of the power generation and CO2 capture systems, or in areas where brine produced from CCS projects can be desalinated to supplement strained municipal supplies. This paper presents a preliminary analysis of the factors impacting the feasibility of coupled CCS-desalination projects. Several injection / extraction scenarios have been examined via the STOMP geochemical flow model resulting in key outputs including extraction wellhead conditions, in situ CO2 plume behavior and reservoir pressure. Economic modeling for the water extraction and desalination portion of these coupled CCS / desalination scenarios suggests that -- while some scenarios yield costs far in excess of most existing desalination projects -- depending on the specific storage formation characteristics and desalination technology employed, fresh water could be produced at costs competitive with seawater desalination facilities, bolstering local water supplies and enabling deployment of industrial projects that might otherwise have been infeasible.

  2. Analysis of impact of “strong DC and weak AC” on receiving-end power system

    NASA Astrophysics Data System (ADS)

    Wang, Qiang; Li, Tianran; Yang, Pengcheng

    2018-02-01

    The rapid development of UHVDC transmission project has brought abundant power supply to the receiving-end power system area, but also many security and stability problems. This paper summarizes four elements that affect the strength of AC system, and then simulates the most basic two-terminal single-pole UHV transmission system by MATLAB/Simulink. It analyses the impact of receiving-end AC power system strength on real-time power, frequency and voltage. Finally, in view of operation risk of “strong DC and weak AC”, this paper puts forward three countermeasures.

  3. Methods, apparatuses, and computer-readable media for projectional morphological analysis of N-dimensional signals

    DOEpatents

    Glazoff, Michael V.; Gering, Kevin L.; Garnier, John E.; Rashkeev, Sergey N.; Pyt'ev, Yuri Petrovich

    2016-05-17

    Embodiments discussed herein in the form of methods, systems, and computer-readable media deal with the application of advanced "projectional" morphological algorithms for solving a broad range of problems. In a method of performing projectional morphological analysis, an N-dimensional input signal is supplied. At least one N-dimensional form indicative of at least one feature in the N-dimensional input signal is identified. The N-dimensional input signal is filtered relative to the at least one N-dimensional form and an N-dimensional output signal is generated indicating results of the filtering at least as differences in the N-dimensional input signal relative to the at least one N-dimensional form.

  4. Water demand and supply co-adaptation to mitigate climate change impacts in agricultural water management

    NASA Astrophysics Data System (ADS)

    Giuliani, Matteo; Mainardi, Matteo; Castelletti, Andrea; Gandolfi, Claudio

    2013-04-01

    Agriculture is the main land use in the world and represents also the sector characterised by the highest water demand. To meet projected growth in human population and per-capita food demand, agricultural production will have to significantly increase in the next decades. Moreover, water availability is nowadays a limiting factor for agricultural production, and is expected to decrease over the next century due to climate change impacts. To effectively face a changing climate, agricultural systems have therefore to adapt their strategies (e.g., changing crops, shifting sowing and harvesting dates, adopting high efficiency irrigation techniques). Yet, farmer adaptation is only one part of the equation because changes in water supply management strategies, as a response to climate change, might impact on farmers' decisions as well. Despite the strong connections between water demand and supply, being the former dependent on agricultural practices, which are affected by the water available that depends on the water supply strategies designed according to a forecasted demand, an analysis of their reciprocal feedbacks is still missing. Most of the recent studies has indeed considered the two problems separately, either analysing the impact of climate change on farmers' decisions for a given water supply scenario or optimising water supply for different water demand scenarios. In this work, we explicitly connect the two systems (demand and supply) by activating an information loop between farmers and water managers, to integrate the two problems and study the co-evolution and co-adaptation of water demand and water supply systems under climate change. The proposed approach is tested on a real-world case study, namely the Lake Como serving the Muzza-Bassa Lodigiana irrigation district (Italy). In particular, given an expectation of water availability, the farmers are able to solve a yearly planning problem to decide the most profitable crop to plant. Knowing the farmers decisions, the operation of the upstream reservoir (Como Lake) is optimised with respect to the real irrigation demand of the crops. Then, the farmers can re-adapt their decisions according with the new optimal operating strategy, thus activating a loop between the two systems that exchange expected supply and irrigation demand. Results show that the proposed interaction between farmers and water managers is able to enhance the efficiency of water management practices, foster crop production and mitigate climate change impacts.

  5. A project of upgrading the operations control system of the Hungarian electric power system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oroszki, L.; Kovacs, G.

    About 20 years ago an on-line EMS/SCADA system replaced the previously used off-line control system in the Hungarian power system. The system that has met the technological requirements of that time now became obsolete. A project started in 1995 by the Hungarian Power Companies, Ltd. (MVM Rt.), the regional utility companies and the power plant companies, with funding through a World Bank loan to cover international procurement, aims to upgrade that system into a complex, intelligent and state-of-the-art process control system. The new hierarchical system will rely on a distributed computer network structure, universally accepted hardware/software interface standards and communicationmore » protocols and use hardware platform independent software. The automatic generation control, performed from the National Dispatch Centre, will have expanded functionality, the most important single item of this will be the inclusion of automatic voltage/var control. The upgrading project includes the replacement of the substation and power plant remote terminal units and the installation of a telecommunication network to provide this telecontrol system with the necessary communications links. The supply contracts for both the master station and the remote terminal unit parts were awarded to the winners of open international bidding processes. In the project implementation MVM has the overall responsibility and works with assistance from international and Hungarian engineering firms.« less

  6. Second Line of Defense, Megaports Initiative, Operational Testing and Evaluation Plan, Port of Lazaro Cardenas, Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, Jamie D.

    2012-05-30

    The purpose of the Operational Testing and Evaluation (OT&E) phases of the project is to prepare for turnover of the Megaports System supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)—located at the Export Lanes of the Port of Lazaro Cardenas, Mexico—to the Government of Mexico (GOM).

  7. 76 FR 28025 - East Maui Pumped Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Storage Water Supply LCC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Act (FPA), proposing to study the feasibility of the East Maui Pumped Storage Water Supply Project to.... Bart M. O'Keeffe, East Maui Pumped Storage Water Supply LLC; P.O. Box 1916; Discovery Bay, CA 94505...

  8. U.S. Offshore Wind Manufacturing and Supply Chain Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, Bruce

    2013-02-22

    This report seeks to provide an organized, analytical approach to identifying and bounding uncertainties around offshore wind manufacturing and supply chain capabilities; projecting potential component-level supply chain needs under three demand scenarios; and identifying key supply chain challenges and opportunities facing the future U.S. market and current suppliers of the nation’s landbased wind market.

  9. Projecting southern timber supply for multiple products by subregion

    Treesearch

    Robert C. Abt; Frederick W. Cubbage; Karen L. Abt

    2009-01-01

    While timber supply modeling has been of importance in the wood-producing regions of the United States for decades, it is only more recently that the technology and data have allowed disaggregation of supply and demand to substate regions, including product specific breakdowns and endogenous land use and plantation changes. Using southwide data and an economic supply...

  10. Autonomous Decentralized Control of Supply and Demand by Inverter Based Distributed Generations in Isolated Microgrid

    NASA Astrophysics Data System (ADS)

    Shiki, Akira; Yokoyama, Akihiko; Baba, Jyunpei; Takano, Tomihiro; Gouda, Takahiro; Izui, Yoshio

    Recently, because of the environmental burden mitigation, energy conservations, energy security, and cost reductions, distributed generations are attracting our strong attention. These distributed generations (DGs) have been already installed to the distribution system, and much more DGs will be expected to be connected in the future. On the other hand, a new concept called “Microgrid” which is a small power supply network consisting of only DGs was proposed and some prototype projects are ongoing in Japan. The purpose of this paper is to develop the three-phase instantaneous valued digital simulator of microgrid consisting of a lot of inverter based DGs and to develop a supply and demand control method in isolated microgrid. First, microgrid is modeled using MATLAB/SIMULINK. We develop models of three-phase instantaneous valued inverter type CVCF generator, PQ specified generator, PV specified generator, PQ specified load as storage battery, photovoltaic generation, fuel cell and inverter load respectively. Then we propose an autonomous decentralized control method of supply and demand in isolated microgrid where storage batteries, fuel cells, photovoltaic generations and loads are connected. It is proposed here that the system frequency is used as a means to control DG output. By changing the frequency of the storage battery due to unbalance of supply and demand, all inverter based DGs detect the frequency fluctuation and change their own outputs. Finally, a new frequency control method in autonomous decentralized control of supply and demand is proposed. Though the frequency is used to transmit the information on the supply and demand unbalance to DGs, after the frequency plays the role, the frequency finally has to return to a standard value. To return the frequency to the standard value, the characteristic curve of the fuel cell is shifted in parallel. This control is carried out corresponding to the fluctuation of the load. The simulation shows that the frequency can be controlled well and has been made clear the effectiveness of the frequency control system.

  11. A gap analysis for future supply of and demand for psychiatrists in Austria.

    PubMed

    Riedel, Monika; Röehrling, Gerald; Czypionka, Thomas; Kasper, Siegfried

    2014-03-01

    In the recent past, a rising caseload demonstrates increasing demand for psychiatrists, and ageing of the current mental health workforce will soon result in growing numbers of retirees. Under these conditions there is some concern whether we soon will face widening gaps in supply. This study calculates projections of future use and supply of psychiatrists' services in Austria until 2030. Resulting gaps are calculated for different scenarios. We mostly use administrative data from several public authorities. To estimate the demand for services, we start from utilization data rather than medical need for services, as we do not have sufficient epidemiological information for Austria. We define several scenarios for the future development of use, all calculated separately for hospital and non-hospital services. Future supply of psychiatric services is projected by applying activity levels to projected numbers of physicians, which are calculated using a stock and flow model. Outflows are modeled using assumptions derived from past activity patterns and current legislation on retirement. To model inflows, we need to gauge the impact of recent developments: Entrance barriers into medical education were introduced, Austria experienced a surge of medical students coming from Germany, and medical schools implemented quotas for different nationalities. Scenarios take several factors into account, like the shifting sex composition of the medical workforce, re-migration of foreign students, and the impact of entrance barriers on enrolment and drop-out rates. Depending on scenario assumptions, demand for psychiatrists will increase by 8% to 52%. But in all supply scenarios, supply will decline from 2016 onwards, thus widening gaps between supply and demand. Even in the most optimistic scenario, supply will have fallen below current levels by 2030. Compared to current rates of service use, a gap between supply and demand will start to widen soon. In the most optimistic combination of scenarios, demand will exceed supply from 2028 onwards, and the projected gap will amount to about 5% of projected demand for services in 2030. Gaps could be miscalculated due to lack of more detailed data, such as retirement patterns of psychiatrists. Shifting responsibilities between psychiatrists and other (mental) health workers as well as changes in psychiatrists' "productivity", e.g. due to more effective medications, were not modeled but would affect results. It will be necessary to improve working and training conditions in order to avoid emigration and to attract a sufficient number of young entrants into the profession.

  12. 18 CFR 806.23 - Standards for water withdrawals.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of groundwater or stream flow levels; rendering competing supplies unreliable; affecting other water..., at its own expense, an alternate water supply or other mitigating measures. (iii) Require the project... deficiencies, identify alternative water supply options, and support existing and proposed future withdrawals. ...

  13. The Systems Engineering Process for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    Systems engineering is designing and optimizing systems. This paper reviews the systems engineering process and indicates how it can be applied in the development of advanced human support systems. Systems engineering develops the performance requirements, subsystem specifications, and detailed designs needed to construct a desired system. Systems design is difficult, requiring both art and science and balancing human and technical considerations. The essential systems engineering activity is trading off and compromising between competing objectives such as performance and cost, schedule and risk. Systems engineering is not a complete independent process. It usually supports a system development project. This review emphasizes the NASA project management process as described in NASA Procedural Requirement (NPR) 7120.5B. The process is a top down phased approach that includes the most fundamental activities of systems engineering - requirements definition, systems analysis, and design. NPR 7120.5B also requires projects to perform the engineering analyses needed to ensure that the system will operate correctly with regard to reliability, safety, risk, cost, and human factors. We review the system development project process, the standard systems engineering design methodology, and some of the specialized systems analysis techniques. We will discuss how they could apply to advanced human support systems development. The purpose of advanced systems development is not directly to supply human space flight hardware, but rather to provide superior candidate systems that will be selected for implementation by future missions. The most direct application of systems engineering is in guiding the development of prototype and flight experiment hardware. However, anticipatory systems engineering of possible future flight systems would be useful in identifying the most promising development projects.

  14. Overview of the Texas Source Water Assessment Project

    USGS Publications Warehouse

    Ulery, Randy L.

    2000-01-01

    The 1996 Amendments to the Safe Drinking Water Act require, for the first time, that each state prepare a source water assessment for all PWS. Previously, Federal regulations focused on sampling and enforcement with emphasis on the quality of delivered water. These Amendments emphasize the importance of protecting the source water. States are required to determine the drinking-water source, the origin of contaminants monitored or the potential contaminants to be monitored, and the intrinsic susceptibility of the source water. Under the amendments to the Act, States must create SWAP Programs. The programs must include an individual source water assessment for each public water system regulated by the State. These assessments will determine whether an individual drinking water source is susceptible to contamination. During 1997?99, TNRCC and USGS staff met as subject-matter working groups to develop an approach to conducting Source Water Susceptibility Assessments (SWSA) and a draft workplan. The draft workplan was then presented to and reviewed by various stakeholder and technical advisory groups. Comments and suggestions from these groups were considered, and a final workplan was produced and presented to the EPA. After EPA approval, work formally began on the Texas SWAP Project. The project has an expected completion date of September 2002. At that time, initial SWSA of all Texas public water supplies should be complete. Ground-water supplies can be considered susceptible if a possible source of contamination (PSOC) exists in the contributing area for the public-supply well field or spring, the contaminant travel time to the well field or spring is short, and the soil zone, vadose zone, and aquifer-matrix materials are unlikely to adequately attenuate the contaminants associated with the PSOC. In addition, particular types of land use/cover within the contributing area may cause the supply to be deemed more susceptible to contamination. Finally, detection of various classes of constituents in water from wells in the vicinity of a public supply well may indicate susceptibility of the public-supply well even though there may be no identifiable PSOC or land use activity. Surface-water supplies are by nature susceptible to contamination from both point and non-point sources. The degree of susceptibility of a PWS to contamination can vary and is a function of the environmental setting, water and wastewater management practices, and land use/cover within a water supply's contributing watershed area. For example, a PWS intake downstream from extensive urban development may be more susceptible to non-point source contamination than a PWS intake downstream from a forested, relatively undeveloped watershed. Surface-water supplies are also susceptible to contamination from point sources, which may include permitted discharges, as well as accidental spills or other introduction of contaminants.

  15. Projecting Future Water Levels of the Laurentian Great Lakes

    NASA Astrophysics Data System (ADS)

    Bennington, V.; Notaro, M.; Holman, K.

    2013-12-01

    The Laurentian Great Lakes are the largest freshwater system on Earth, containing 84% of North America's freshwater. The lakes are a valuable economic and recreational resource, valued at over 62 billion in annual wages and supporting a 7 billion fishery. Shipping, recreation, and coastal property values are significantly impacted by water level variability, with large economic consequences. Great Lakes water levels fluctuate both seasonally and long-term, responding to natural and anthropogenic climate changes. Due to the integrated nature of water levels, a prolonged small change in any one of the net basin supply components: over-lake precipitation, watershed runoff, or evaporation from the lake surface, may result in important trends in water levels. We utilize the Abdus Salam International Centre for Theoretical Physics's Regional Climate Model Version 4.5.6 to dynamically downscale three global global climate models that represent a spread of potential future climate change for the region to determine whether the climate models suggest a robust response of the Laurentian Great Lakes to anthropogenic climate change. The Model for Interdisciplinary Research on Climate Version 5 (MIROC5), the National Centre for Meteorological Research Earth system model (CNRM-CM5), and the Community Climate System Model Version 4 (CCSM4) project different regional temperature increases and precipitation change over the next century and are used as lateral boundary conditions. We simulate the historical (1980-2000) and late-century periods (2080-2100). Upon model evaluation we will present dynamically downscaled projections of net basin supply changes for each of the Laurentian Great Lakes.

  16. Quantitative bacterial examination of domestic water supplies in the Lesotho Highlands: water quality, sanitation, and village health.

    PubMed Central

    Kravitz, J. D.; Nyaphisi, M.; Mandel, R.; Petersen, E.

    1999-01-01

    Reported are the results of an examination of domestic water supplies for microbial contamination in the Lesotho Highlands, the site of a 20-year-old hydroelectric project, as part of a regional epidemiological survey of baseline health, nutritional and environmental parameters. The population's hygiene and health behaviour were also studied. A total of 72 village water sources were classified as unimproved (n = 23), semi-improved (n = 37), or improved (n = 12). Based on the estimation of total coliforms, which is a nonspecific bacterial indicator of water quality, all unimproved and semi-improved water sources would be considered as not potable. Escherichia coli, a more precise indicator of faecal pollution, was absent (P < 0.001) in most of the improved water sources. Among 588 queried households, only 38% had access to an "improved" water supply. Sanitation was a serious problem, e.g. fewer than 5% of villagers used latrines and 18% of under-5-year-olds had suffered a recent diarrhoeal illness. The study demonstrates that protection of water sources can improve the hygienic quality of rural water supplies, where disinfection is not feasible. Our findings support the WHO recommendation that E. coli should be the principal microbial indicator for portability of untreated water. Strategies for developing safe water and sanitation systems must include public health education in hygiene and water source protection, practical methods and standards for water quality monitoring, and a resource centre for project information to facilitate programme evaluation and planning. PMID:10593031

  17. European questions related to satelite power systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kassing, D.

    1983-01-01

    A number of problems which have been identified in recent European studies related to satellite power systems are addressed. Based on energy demand and supply projections for Europe, developed by the International Institute for Applied Systems Analysis, the potential of power satellites in a future energy mix is discussed. A few major constraints are presented which may restrict power transmission to European receiving sites, e.g., orbital limitations, siting problems of the ground station, and economic and institutional issues. Conceptual designs for the structure of ground receiving stations located offshore near the European coastlines are described.

  18. Teacher Supply and Demand in the ACT Schools Authority: Implications of Enrollment Projections 1981-1986. Research Report.

    ERIC Educational Resources Information Center

    Burkhardt, Geoffrey

    An analysis of policy options concerning teacher supply and demand in the A.C.T. [Australian Capital Territory] Schools Authority from 1981 to 1986 is presented. Projections have indicated declining demand for primary school teachers, fewer promotions in primary schools, and the necessity of relocating teachers to areas of expansion. However,…

  19. Development of Procedures for Generating Alternative Allied Health Manpower Requirements and Supply Estimates.

    ERIC Educational Resources Information Center

    Applied Management Sciences, Inc., Silver Spring, MD.

    This report presents results of a project to assess the adequacy of existing data sources on the supply of 21 allied health occupations in order to develop improved data collection strategies and improved procedures for estimation of manpower needs. Following an introduction, chapter 2 provides a discussion of the general phases of the project and…

  20. Where to cut, where to run : prospects for U.S. South softwood timber supplies and prices

    Treesearch

    Henry Spelter

    1999-01-01

    A review of market history shows that southern pine sawtimber stumpage prices have increased by over 150 percent in this decade (Timber Mart South). Concurrently, some (i.e. Cubbage and Abt (1996) Nilsson et al (1999)) have questioned the adequacy of southern timber supplies to meet projected demands, which are projected to increase by...

  1. Responsible Management and Use of a Personal Take-Home Naloxone Supply: A Pilot Project

    ERIC Educational Resources Information Center

    McAuley, Andrew; Lindsay, George; Woods, Maureen; Louttit, Derek

    2010-01-01

    Aims: To assess if Scottish drug users, their family and friends could be trained in critical incident management and the safe and effective administration of naloxone. The project also sought to monitor whether drug users can manage their own personal take-home naloxone (THN) supply and use it appropriately in an emergency opiate overdose…

  2. Supply and Demand for College Graduates in the South, 1980. Manpower and Education.

    ERIC Educational Resources Information Center

    Engels, Richard A.; Galambos, Eva C.

    This report presents findings on the supply of college graduates in 1980 in the Southern region as compared to openings in which they may become employed. The projections of the Southern Regional Education Board (SREB) indicate that for a range of 421 occupations (the Comprehensive Projection), there will be a deficit of college educated workers.…

  3. NREL Integrate: RCS-4-42326

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hudgins, Andrew P.; Waight, Jim; Grover, Shailendra

    OMNETRIC Corp., Duke Energy, CPS Energy, and the University of Texas at San Antonio (UTSA) created a project team to execute the project 'OpenFMB Reference Architecture Demonstration.' The project included development and demonstration of concepts that will enable the electric utility grid to host larger penetrations of renewable resources. The project concept calls for the aggregation of renewable resources and loads into microgrids and the control of these microgrids with an implementation of the OpenFMB Reference Architecture. The production of power from the renewable resources that are appearing on the grid today is very closely linked to the weather. Themore » difficulty of forecasting the weather, which is well understood, leads to difficulty in forecasting the production of renewable resources. The current state of the art in forecasting the power production from renewables (solar PV and wind) are accuracies in the range of 12-25 percent NMAE. In contrast the demand for electricity aggregated to the system level, is easier to predict. The state of the art of demand forecasting done, 24 hours ahead, is about 2-3% MAPE. Forecasting the load to be supplied from conventional resources (demand minus generation from renewable resources) is thus very hard to forecast. This means that even a few hours before the time of consumption, there can be considerable uncertainty over what must be done to balance supply and demand. Adding to the problem of difficulty of forecasting, is the reality of the variability of the actual production of power from renewables. Due to the variability of wind speeds and solar insolation, the actual output of power from renewable resources can vary significantly over a short period of time. Gusts of winds result is variation of power output of wind turbines. The shadows of clouds moving over solar PV arrays result in the variation of power production of the array. This compounds the problem of balancing supply and demand in real time. Establishing a control system that can manage distribution systems with large penetrations of renewable resources is difficult due to two major issues: (1) the lack of standardization and interoperability between the vast array of equipment in operation and on the market, most of which use different and proprietary means of communication and (2) the magnitude of the network and the information it generates and consumes. The objective of this project is to provide the industry with a design concept and tools that will enable the electric power grid to overcome these barriers and support a larger penetration of clean energy from renewable resources.« less

  4. The nursing workforce in Kuwait to the year 2020.

    PubMed

    Al-Jarallah, K F; Moussa, M A A; Hakeem, S K; Al-Khanfar, F K

    2009-03-01

    The study addresses the supply and demand for nurses in Kuwait in the light of emerging variables such as increasing population, economic growth, changes in healthcare strategies and expansion of healthcare facilities. To project the future demand for nurses in Kuwait for the years 2007-2020 based on the period 1994-2006. Population projections were derived using the average annual natural increase rate of the 1994-2006 populations. The future demand for nurses was projected using the average nurse to population ratios for the years 1994-2006. The number of Kuwaiti indigenous nurses is declining at an average decrement rate of 3.3% per annum. There is a gap between the numbers of native and migrant nurses, which will be wider with time. In 2006, native nurses constituted only 6.6% of the nursing workforce; this affects the quality of provided health care owing to language, religions and socio-cultural barriers between foreign nurses and patients. The supply of indigenous nurses in Kuwait should be increased in order to deliver effective nursing care with shared culture and language in the modern healthcare system of Kuwait. This can be achieved through an improvement in recruitment and retention of indigenous nurses and nursing students.

  5. Production roll out plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects,more » General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.« less

  6. Energy Requirements by the Water Sector in the Southwestern US: Past, Present, and Future

    NASA Astrophysics Data System (ADS)

    Averyt, K.; Yates, D. N.; Meldrum, J.

    2014-12-01

    Climate, energy, and water are fundamentally linked such that shifts in one sector have cascading impacts on the others. Consideration of the integrated system is necessary to fully understand the individual risk profile of each sector. In defining vulnerabilities and potential adaptations, the policy and regulatory environment must be considered alongside the biological and physical systems. Take, for example, the Southwestern U.S., a naturally arid system, where water availability is declining as a consequence of climate change and population growth. Adaptations by the water sector to convey, store, and develop new water sources (e.g. desalination, groundwater pumping, water-reuse) are strategies designed to enhance sustainability of the sector. But, the energy requirements embedded in these management techniques pose challenges to electric utilities. West wide, approximately 20% of total electricity generation goes toward supplying and heating water. If future investments made by the water sector to deal with changing supply and demand regimes continue to follow current trends, the dependence of water on energy availability will grow, meaning that the water supply will be increasingly reliant on the electricity system. Here, we use the example of long-term aridity and the recent drought in the Western US to illustrate the tradeoffs and challenges inherent at the nexus between energy and water. We present long-term trends in the energy intensity of water supplies in the Southwestern US, with a specific focus on groundwater systems. Projected energy requirements for proposed and future conveyance systems are discussed. The potential impacts of reduced flows on the Colorado River on the energy demands for groundwater pumping in the Lower Colorado River Basin are highlighted.

  7. The design of an ECRH system for JET-EP

    NASA Astrophysics Data System (ADS)

    Verhoeven, A. G. A.; Bongers, W. A.; Elzendoorn, B. S. Q.; Graswinckel, M.; Hellingman, P.; Kooijman, W.; Kruijt, O. G.; Maagdenberg, J.; Ronden, D.; Stakenborg, J.; Sterk, A. B.; Tichler, J.; Alberti, S.; Goodman, T.; Henderson, M.; Hoekzema, J. A.; Oosterbeek, J. W.; Fernandez, A.; Likin, K.; Bruschi, A.; Cirant, S.; Novak, S.; Piosczyk, B.; Thumm, M.; Bindslev, H.; Kaye, A.; Fleming, C.; Zohm, H.

    2003-11-01

    An electron cyclotron resonance heating (ECRH) system has been designed for JET in the framework of the JET enhanced performance project (JET-EP) under the European fusion development agreement. Due to financial constraints it has been decided not to implement this project. Nevertheless, the design work conducted from April 2000 to January 2002 shows a number of features that can be relevant in preparation of future ECRH systems, e.g. for ITER. The ECRH system was foreseen to comprise six gyrotrons, 1 MW each, in order to deliver 5 MW into the plasma (Verhoeven A.G.A. et al 2001 The ECRH system for JET 26th Int. Conf. on Infrared and Millimeter Waves (Toulouse, 10 14 September 2001) p 83; Verhoeven A.G.A. et al 2003 The 113 GHz ECRH system for JET Proc. 12th Joint Workshop on ECE and ECRH (13 16 May 2002) ed G. Giruzzi (Aix-en-Provence: World Scientific) pp 511 16). The main aim was to enable the control of neo-classical tearing modes. The paper will concentrate on: the power-supply and modulation system, including series IGBT switches, to enable independent control of each gyrotron and an all-solid-state body power supply to stabilize the gyrotron output power and to enable fast modulations up to 10 kHz and a plug-in launcher that is steerable in both toroidal and poloidal angles and able to handle eight separate mm-wave beams. Four steerable launching mirrors were foreseen to handle two mm-wave beams each. Water cooling of all the mirrors was a particularly ITER-relevant feature.

  8. 45 CFR 602.33 - Supplies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Supplies. 602.33 Section 602.33 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION UNIFORM ADMINISTRATIVE... the award, and if the supplies are not needed for any other federally sponsored programs or projects...

  9. 45 CFR 602.33 - Supplies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Supplies. 602.33 Section 602.33 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION UNIFORM ADMINISTRATIVE... the award, and if the supplies are not needed for any other federally sponsored programs or projects...

  10. 45 CFR 602.33 - Supplies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Supplies. 602.33 Section 602.33 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION UNIFORM ADMINISTRATIVE... the award, and if the supplies are not needed for any other federally sponsored programs or projects...

  11. Training People for the Job.

    ERIC Educational Resources Information Center

    Costa, Walter Pinto

    1983-01-01

    A large training program for the drinking water supply and sanitation sector has been running continuously for over 10 years in Brazil, helping to ensure a supply of manpower for the country's National Water Supply and Sanitation Plan. Highlights of this program's activities/projects are discussed. (Author/JN)

  12. 45 CFR 602.33 - Supplies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Supplies. 602.33 Section 602.33 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION UNIFORM ADMINISTRATIVE... the award, and if the supplies are not needed for any other federally sponsored programs or projects...

  13. 45 CFR 602.33 - Supplies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Supplies. 602.33 Section 602.33 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION UNIFORM ADMINISTRATIVE... the award, and if the supplies are not needed for any other federally sponsored programs or projects...

  14. 22 CFR 518.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  15. 7 CFR 550.40 - Supplies and other expendable property.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS...-sponsored project or program, the Cooperator shall retain the supplies for use on non-Federal sponsored... not use supplies acquired with Federal funds to provide services to non-Federal outside organizations...

  16. 22 CFR 518.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  17. 22 CFR 518.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  18. 7 CFR 550.40 - Supplies and other expendable property.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS...-sponsored project or program, the Cooperator shall retain the supplies for use on non-Federal sponsored... not use supplies acquired with Federal funds to provide services to non-Federal outside organizations...

  19. 22 CFR 518.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  20. 22 CFR 518.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  1. 7 CFR 550.40 - Supplies and other expendable property.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS...-sponsored project or program, the Cooperator shall retain the supplies for use on non-Federal sponsored... not use supplies acquired with Federal funds to provide services to non-Federal outside organizations...

  2. Socioeconomic impacts of climate change on U.S. water supplies

    USGS Publications Warehouse

    Frederick, K.D.; Schwarz, G.E.

    1999-01-01

    A greenhouse warming would have major effects on water supplies and demands. A framework for examining the socioeconomic impacts associated with changes in the long-term availability of water is developed and applied to the hydrologic implications of the Canadian and British Hadley2 general circulation models (GCMs) for the 18 water resource regions in the conterminous United States. The climate projections of these two GCMs have very different implications for future water supplies and costs. The Canadian model suggests most of the nation would be much drier in the year 2030. Under the least-cost management scenario the drier climate could add nearly $105 billion to the estimated costs of balancing supplies and demands relative to the costs without climate change. Measures to protect instream flows and irrigation could result in significantly higher costs. In contrast, projections based on the Hadley model suggest water supplies would increase throughout much of the nation, reducing the costs of balancing water supplies with demands relative to the no-climate-change case.

  3. Low Voltage Electron Beam Processing Final Report CRADA No. TC-645-93-A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, H.; Wakalopulos, G.

    This CRADA project was established to develop a small, inexpensive sealed-tube electron beam processing system having immediate applications in industrial, high speed manufacturing processes, and in the Department of Energy (DOE) waste treatment/cleanup operations. The technical work involved the development and demonstration of a compact, sealed, 50-75 kilovolt (kV) EB generator prototype, including controls and power supply. The specific goals of this project were to develop a low cost vacuum tube capable of shooting an electron beam several inches into the air, and to demonstrate that wide area materials processing is feasible by stacking the tubes to produce continuous beams.more » During the project, we successfully demonstrated the producibility of a low cost electron beam system and several material processing operations of interest to US industry, DOE and, since September 11, 2001, the Homeland Security.« less

  4. Estimation of the year-on-year volatility and the unpredictability of the United States energy system

    NASA Astrophysics Data System (ADS)

    Sherwin, Evan D.; Henrion, Max; Azevedo, Inês M. L.

    2018-04-01

    Long-term projections of energy consumption, supply and prices heavily influence decisions regarding long-lived energy infrastructure. Predicting the evolution of these quantities over multiple years to decades is a difficult task. Here, we estimate year-on-year volatility and unpredictability over multi-decade time frames for many quantities in the US energy system using historical projections. We determine the distribution over time of the most extreme projection errors (unpredictability) from 1985 to 2014, and the largest year-over-year changes (volatility) in the quantities themselves from 1949 to 2014. Our results show that both volatility and unpredictability have increased in the past decade, compared to the three and two decades before it. These findings may be useful for energy decision-makers to consider as they invest in and regulate long-lived energy infrastructure in a deeply uncertain world.

  5. Economic concepts to address future water supply-demand imbalances in Iran, Morocco and Saudi Arabia

    NASA Astrophysics Data System (ADS)

    Hellegers, Petra; Immerzeel, Walter; Droogers, Peter

    2013-10-01

    In Middle East and North Africa (MENA) countries, renewable groundwater and surface water supply are limited while demand for water is growing rapidly. Climate change is expected to increase water demand even further. The main aim of this paper is to evaluate the water supply-demand imbalances in Iran, Morocco and Saudi Arabia in 2040-2050 under dry, average and wet climate change projections and to show on the basis of the marginal cost and marginal value of water the optimum mix of supply-side and demand-side adjustments to address the imbalance. A hydrological model has been used to estimate the water supply-demand imbalance. Water supply and demand curves have been used to explore for which (marginal value of) water usage the marginal cost of supply-enhancement becomes too expensive. The results indicate that in the future in all cases, except in Iran under the wet climate projection, the quantity of water demanded has to be reduced considerably to address the imbalance, which is indeed what is currently happening already.

  6. Optimization and thermoeconomics research of a large reclaimed water source heat pump system.

    PubMed

    Zhang, Zi-ping; Du, Fang-hui

    2013-01-01

    This work describes a large reclaimed water source heat pump system (RWSHPS) and elaborates on the composition of the system and its design principles. According to the characteristics of the reclaimed water and taking into account the initial investment, the project is divided into two stages: the first stage adopts distributed heat pump heating system and the second adopts the combination of centralized and decentralized systems. We analyze the heating capacity of the RWSHPS, when the phase II project is completed, the system can provide hydronic heating water with the supply and return water temperature of 55°C/15°C and meet the hydronic heating demand of 8 million square meters of residential buildings. We make a thermal economics analysis by using Thermal Economics theory on RWSHPS and gas boiler system, it is known that the RWSHPS has more advantages, compared with the gas boiler heating system; both its thermal efficiency and economic efficiency are relatively high. It provides a reference for future applications of the RWSHPS.

  7. Income-based projections of water footprint of food consumption in Uzbekistan

    NASA Astrophysics Data System (ADS)

    Djanibekov, Nodir; Frohberg, Klaus; Djanibekov, Utkur

    2013-11-01

    Assessing future water requirements for feeding the growing population of Central Asia can improve understanding of the projected water supply scenarios in the region. Future water requirements will be partially determined by the dietary habits of the populations, and are thus responsive to significant variation of income levels. Using Uzbekistan as an example, this study projects the water footprints of income driven changes on the population's diet in Central Asia. To reveal the influence of large income changes on dietary habits a Normalized Quadratic-Quadratic Expenditure System was calibrated and applied to data from 2009. The national water footprints of food consumption in Uzbekistan were projected until 2034 by applying the parameterized demand system to estimate the respective water footprint values. The results showed that for Uzbekistan the projected increase in the food consumption water footprint would be primarily linked to income growth rather than population growth. Due to the high water footprint of common food products, the composition of the population's diet, and responsiveness to income, economic growth is expected to put greater pressure on water resources in Uzbekistan unless proper measures are undertaken.

  8. Inspector General, Department of Defense, Semiannual Report to the Congress, April 1, 2010 - September 30, 2010

    DTIC Science & Technology

    2010-10-01

    Centers 06/21/2010 USAAA A-2010-0121-ALO Real Property Sustainment, Restoration, and Modernization 06/25/2010 USAAA A-2010-0124- FFM Review of Port...Supply Enhanced System, Project Manager, 07/07/2010 Cruise Missile Defense System USAAA A-2010-0131- FFM Agreed-Upon Procedures Attestation of Audit... FFM Follow-up Audit of FY 05 Subsistence Charges 07/29/2010 USAAA A-2010-0144-ALR Follow-up Audit of Property Accountability, Oklahoma Army National

  9. Chapter 4: Small Commercial and Residential Unitary and Split System HVAC Heating and Cooling Equipment-Efficiency Upgrade Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W; Jacobson, David; Metoyer, Jarred

    The specific measure described here involves improving the overall efficiency in air-conditioning systems as a whole (compressor, evaporator, condenser, and supply fan). The efficiency rating is expressed as the energy efficiency ratio (EER), seasonal energy efficiency ratio (SEER), and integrated energy efficiency ratio (IEER). The higher the EER, SEER or IEER, the more efficient the unit is.

  10. The Eastring gas pipeline in the context of the Central and Eastern European gas supply challenge

    NASA Astrophysics Data System (ADS)

    Mišík, Matúš; Nosko, Andrej

    2017-11-01

    Ever since the 2009 natural gas crisis, energy security has been a crucial priority for countries of Central and Eastern Europe. Escalating in 2014, the conflict between Ukraine and Russia further fuelled negative expectations about the future development of energy relations for the region predominantly supplied by Russia. As a response to the planned cessation of gas transit through the Brotherhood pipeline, which brings Russian gas to Europe via Ukraine and Slovakia, the Slovak transmission system operator Eustream proposed the Eastring pipeline. This Perspective analyses this proposal and argues that neither the perceived decrease in Slovak energy security nor the loss of economic rent from the international gas transit should be the main policy driver behind such a major infrastructure project. Although marketed as an answer to current Central and Eastern European gas supply security challenges, the Eastring pipeline is actually mainly focused on issues connected to the Slovak gas transit.

  11. Human deforestation outweighs future climate change impacts of sedimentation on coral reefs

    PubMed Central

    Maina, Joseph; de Moel, Hans; Zinke, Jens; Madin, Joshua; McClanahan, Tim; Vermaat, Jan E.

    2013-01-01

    Near-shore coral reef systems are experiencing increased sediment supply due to conversion of forests to other land uses. Counteracting increased sediment loads requires an understanding of the relationship between forest cover and sediment supply, and how this relationship might change in the future. Here we study this relationship by simulating river flow and sediment supply in four watersheds that are adjacent to Madagascar’s major coral reef ecosystems for a range of future climate change projections and land-use change scenarios. We show that by 2090, all four watersheds are predicted to experience temperature increases and/or precipitation declines that, when combined, result in decreases in river flow and sediment load. However, these climate change-driven declines are outweighed by the impact of deforestation. Consequently, our analyses suggest that regional land-use management is more important than mediating climate change for influencing sedimentation of Malagasy coral reefs. PMID:23736941

  12. Human deforestation outweighs future climate change impacts of sedimentation on coral reefs.

    PubMed

    Maina, Joseph; de Moel, Hans; Zinke, Jens; Madin, Joshua; McClanahan, Tim; Vermaat, Jan E

    2013-01-01

    Near-shore coral reef systems are experiencing increased sediment supply due to conversion of forests to other land uses. Counteracting increased sediment loads requires an understanding of the relationship between forest cover and sediment supply, and how this relationship might change in the future. Here we study this relationship by simulating river flow and sediment supply in four watersheds that are adjacent to Madagascar's major coral reef ecosystems for a range of future climate change projections and land-use change scenarios. We show that by 2090, all four watersheds are predicted to experience temperature increases and/or precipitation declines that, when combined, result in decreases in river flow and sediment load. However, these climate change-driven declines are outweighed by the impact of deforestation. Consequently, our analyses suggest that regional land-use management is more important than mediating climate change for influencing sedimentation of Malagasy coral reefs.

  13. The Pediatric Anesthesiology Workforce: Projecting Supply and Trends 2015-2035.

    PubMed

    Muffly, Matthew K; Singleton, Mark; Agarwal, Rita; Scheinker, David; Miller, Daniel; Muffly, Tyler M; Honkanen, Anita

    2018-02-01

    A workforce analysis was conducted to predict whether the projected future supply of pediatric anesthesiologists is balanced with the requirements of the inpatient pediatric population. The specific aims of our analysis were to (1) project the number of pediatric anesthesiologists in the future workforce; (2) project pediatric anesthesiologist-to-pediatric population ratios (0-17 years); (3) project the mean number of inpatient pediatric procedures per pediatric anesthesiologist; and (4) evaluate the effect of alternative projections of individual variables on the model projections through 2035. The future number of pediatric anesthesiologists is determined by the current supply, additions to the workforce, and departures from the workforce. We previously compiled a database of US pediatric anesthesiologists in the base year of 2015. The historical linear growth rate for pediatric anesthesiology fellowship positions was determined using the Accreditation Council for Graduate Medical Education Data Resource Books from 2002 to 2016. The future number of pediatric anesthesiologists in the workforce was projected given growth of pediatric anesthesiology fellowship positions at the historical linear growth rate, modeling that 75% of graduating fellows remain in the pediatric anesthesiology workforce, and anesthesiologists retire at the current mean retirement age of 64 years old. The baseline model projections were accompanied by age- and gender-adjusted anesthesiologist supply, and sensitivity analyses of potential variations in fellowship position growth, retirement, pediatric population, inpatient surgery, and market share to evaluate the effect of each model variable on the baseline model. The projected ratio of pediatric anesthesiologists to pediatric population was determined using the 2012 US Census pediatric population projections. The projected number of inpatient pediatric procedures per pediatric anesthesiologist was determined using the Kids' Inpatient Database historical data to project the future number of inpatient procedures (including out of operating room procedures). In 2015, there were 5.4 pediatric anesthesiologists per 100,000 pediatric population and a mean (±standard deviation [SD]) of 262 ±8 inpatient procedures per pediatric anesthesiologist. If historical trends continue, there will be an estimated 7.4 pediatric anesthesiologists per 100,000 pediatric population and a mean (±SD) 193 ±6 inpatient procedures per pediatric anesthesiologist in 2035. If pediatric anesthesiology fellowship positions plateau at 2015 levels, there will be an estimated 5.7 pediatric anesthesiologists per 100,000 pediatric population and a mean (±SD) 248 ±7 inpatient procedures per pediatric anesthesiologist in 2035. If historical trends continue, the growth in pediatric anesthesiologist supply may exceed the growth in both the pediatric population and inpatient procedures in the 20-year period from 2015 to 2035.

  14. Design of components for the NASA OCEAN project

    NASA Technical Reports Server (NTRS)

    Wright, Jenna (Editor); Clift, James; Dumais, Bryan; Gardner, Shannon; Hernandez, Juan Carlos; Nolan, Laura; Park, Mia; Peoples, Don; Phillips, Elizabeth; Tillman, Mark

    1993-01-01

    The goal of the Fall 1993 semester of the EGM 4000 class was to design, fabricate, and test components for the 'Ocean CELSS Experimental Analog NASA' Project (OCEAN Project) and to aid in the future development of NASA's Controlled Ecological Life Support System (CELSS). The OCEAN project's specific aims are to place a human, Mr. Dennis Chamberland from NASA's Life Science Division of Research, into an underwater habitat off the shore of Key Largo, FL for three months. During his stay, he will monitor the hydroponic growth of food crops and evaluate the conditions necessary to have a successful harvest of edible food. The specific designs chosen to contribute to the OCEAN project by the EGM 4000 class are in the areas of hydroponic habitat monitoring, human health monitoring, and production of blue/green algae. The hydroponic monitoring system focused on monitoring the environment of the plants. This included the continuous sensing of the atmospheric and hydroponic nutrient solution temperatures. Methods for monitoring the continuous flow of the hydroponic nutrient solution across the plants and the continuous supply of power for these sensing devices were also incorporated into the design system. The human health monitoring system concentrated on continuously monitoring various concerns of the occupant in the underwater living habitat of the OCEAN project. These concerns included monitoring the enclosed environment for dangerous levels of carbon monoxide and smoke, high temperatures from fire, and the ceasing of the continuous airflow into the habitat. The blue/green algae project emphasized both the production and harvest of a future source of food. This project did not interact with any part of the OCEAN project. Rather, it was used to show the possibility of growing this kind of algae as a supplemental food source inside a controlled ecological life support system.

  15. Power-law Growth and Punctuated Equilibrium Dynamics in Water Resources Systems

    NASA Astrophysics Data System (ADS)

    Parolari, A.; Katul, G. G.; Porporato, A. M.

    2015-12-01

    The global rise in population-driven water scarcity and recent appreciation of strong dynamic coupling between human and natural systems has called for new approaches to predict the future sustainability of regional and global water resources systems. The dynamics of coupled human-water systems are driven by a complex set of social, environmental, and technological factors. Present projections of water resources systems range from a finite carrying capacity regulated by accessible freshwater, or `peak renewable water,' to punctuated evolution with new supplied and improved efficiency gained from technological and social innovation. However, these projections have yet to be quantified from observations or in a comprehensive theoretical framework. Using data on global water withdrawals and storage capacity of regional water supply systems, non-trivial dynamics are identified in water resources systems development over time, including power-law growth and punctuated equilibria. Two models are introduced to explain this behavior: (1) a delay differential equation and (2) a power-law with log-periodic oscillations, both of which rely on past conditions (or system memory) to describe the present rate of growth in the system. In addition, extension of the first model demonstrates how system delays and punctuated equilibria can emerge from coupling between human population growth and associated resource demands. Lastly, anecdotal evidence is used to demonstrate the likelihood of power-law growth in global water use from the agricultural revolution 3000 BC to the present. In a practical sense, the presence of these patterns in models with delayed oscillations suggests that current decision-making related to water resources development results from the historical accumulation of resource use decisions, technological and social changes, and their consequences.

  16. Analysis of recent projections of electric power demand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hudson, Jr, D V

    1993-08-01

    This report reviews the changes and potential changes in the outlook for electric power demand since the publication of Review and Analysis of Electricity Supply Market Projections (B. Swezey, SERI/MR-360-3322, National Renewable Energy Laboratory). Forecasts of the following organizations were reviewed: DOE/Energy Information Administration, DOE/Policy Office, DRI/McGraw-Hill, North American Electric Reliability Council, and Gas Research Institute. Supply uncertainty was briefly reviewed to place the uncertainties of the demand outlook in perspective. Also discussed were opportunities for modular technologies, such as renewable energy technologies, to fill a potential gap in energy demand and supply.

  17. 10 CFR 600.135 - Supplies and other expendable property.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for a fee that is less than private companies charge for equivalent services, unless specifically...

  18. 15 CFR 14.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON... other federally-sponsored project or program, the recipient shall retain the supplies for use on non...) The recipient shall not use supplies acquired with Federal funds to provide services to non-Federal...

  19. 49 CFR 19.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  20. 49 CFR 19.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  1. 15 CFR 14.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON... other federally-sponsored project or program, the recipient shall retain the supplies for use on non...) The recipient shall not use supplies acquired with Federal funds to provide services to non-Federal...

  2. 10 CFR 600.135 - Supplies and other expendable property.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for a fee that is less than private companies charge for equivalent services, unless specifically...

  3. 2 CFR 215.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT...-sponsored project or program, the recipient shall retain the supplies for use on non-Federal sponsored... use supplies acquired with Federal funds to provide services to non-Federal outside organizations for...

  4. Mathematical Modeling of Food Supply for Long Term Space Missions Using Advanced Life Support

    NASA Technical Reports Server (NTRS)

    Cruthirds, John E.

    2003-01-01

    A habitat for long duration missions which utilizes Advanced Life Support (ALS), the Bioregenerative Planetary Life Support Systems Test Complex (BIO-Plex), is currently being built at JSC. In this system all consumables will be recycled and reused. In support of this effort, a menu is being planned utilizing ALS crops that will meet nutritional and psychological requirements. The need exists in the food system to identify specific physical quantities that define life support systems from an analysis and modeling perspective. Once these quantities are defined, they need to be fed into a mathematical model that takes into consideration other systems in the BIO-Plex. This model, if successful, will be used to understand the impacts of changes in the food system on the other systems and vice versa. The Equivalent System Mass (ESM) metric has been used to describe systems and subsystems, including the food system options, in terms of the single parameter, mass. There is concern that this approach might not adequately address the important issues of food quality and psychological impact on crew morale of a supply of fiesh food items. In fact, the mass of food can also depend on the quality of the food. This summer faculty fellow project will involve creating an appropriate mathematical model for the food plan developed by the Food Processing System for BIO-Plex. The desired outcome of this work will be a quantitative model that can be applied to the various options of supplying food on long-term space missions.

  5. Fort Cobb Reservoir Watershed, Oklahoma and Thika River Watershed, Kenya Twinning Pilot Project

    NASA Astrophysics Data System (ADS)

    Moriasi, D.; Steiner, J.; Arnold, J.; Allen, P.; Dunbar, J.; Shisanya, C.; Gathenya, J.; Nyaoro, J.; Sang, J.

    2007-12-01

    The Fort Cobb Reservoir Watershed (FCRW) (830 km2) is a watershed within the HELP Washita Basin, located in Caddo and Washita Counties, OK. It is also a benchmark watershed under USDA's Conservation Effects Assessment Project, a national project to quantify environmental effects of USDA and other conservation programs. Population in south-western Oklahoma, in which FCRW is located, is sparse and decreasing. Agricultural focuses on commodity production (beef, wheat, and row crops) with high costs and low margins. Surface and groundwater resources supply public, domestic, and irrigation water. Fort Cobb Reservoir and contributing stream segments are listed on the Oklahoma 303(d) list as not meeting water quality standards based on sedimentation, trophic level of the lake associated with phosphorus loads, and nitrogen in some stream segments in some seasons. Preliminary results from a rapid geomorphic assessment results indicated that unstable stream channels dominate the stream networks and make a significant but unknown contribution to suspended-sediment loadings. Impairment of the lake for municipal water supply, recreation, and fish and wildlife are important factors in local economies. The Thika River Watershed (TRW) (867 km2) is located in central Kenya. Population in TRW is high and increasing, which has led to a poor land-population ratio with population densities ranging from 250 people/km2 to over 500 people/km2. The poor land-population ratio has resulted in land sub-division, fragmentation, over- cultivation, overgrazing, and deforestation which have serious implications on soil erosion, which poses a threat to both agricultural production and downstream reservoirs. Agricultural focuses mainly on subsistence and some cash crops (dairy cattle, corn, beans, coffee, floriculture and pineapple) farming. Surface and groundwater resources supply domestic, public, and hydroelectric power generation water. Thika River supplies 80% of the water for the city of Nairobi. A dam was constructed in 1994 with a water reservoir of 70 million m3. Thika River also supplies water to Masinga Reservoir to supply the seven forks dams, which together supply 75% of the nation's electricity. The quantity of water in rivers and reservoirs is decreased due to sedimentation while water quality is degraded by sediments, and sediment-borne nutrients and pesticides. The focus of this pilot twinning project is watershed erosion and reservoir sedimentation assessment. This will be accomplished by (1) a rapid watershed/catchment erosion assessment using ground based measurements and remote sensing/GIS techniques, 2) use of Acoustic Profiling Systems (APS) for reservoir sedimentation measurement studies, and 3) advanced water quality modeling using the soil and water assessment tool (SWAT) model. Data acquired will be used for sediment transport modeling to1) determine sediment "hot spots" and management practices that will minimize sediments into reservoirs in order to 2) maintain the reservoirs on which many farmers depend for their livelihood and a cleaner environment. This project will provide an opportunity for 1) sharing knowledge and experience among the stakeholders, 2) building capacity through formal and informal education opportunities through reciprocal hosting of decision makers and water experts, and 3) technology transfer of pilot results with recommended management practices to reduce reservoir sedimentation rates.

  6. Floating Offshore WTG Integrated Load Analysis & Optimization Employing a Tuned Mass Damper

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rodriguez Tsouroukdissian, Arturo; Lackner, Matt; Cross-Whiter, John

    2015-09-25

    Floating offshore wind turbines (FOWTs) present complex design challenges due to the coupled dynamics of the platform motion, mooring system, and turbine control systems, in response to wind and wave loading. This can lead to higher extreme and fatigue loads than a comparable fixed bottom or onshore system. Previous research[1] has shown the potential to reduced extreme and fatigue loads on FOWT using tuned mass dampers (TMD) for structural control. This project aims to reduce maximum loads using passive TMDs located at the tower top during extreme storm events, when grid supplied power for other controls systems may not bemore » available. The Alstom Haliade 6MW wind turbine is modelled on the Glosten Pelastar tension-leg platform (TLP). The primary objectives of this project are to provide a preliminary assessment of the load reduction potential of passive TMDs on real wind turbine and TLP designs.« less

  7. Technological changes in the healthcare sector. A method to assess change readiness.

    PubMed

    Kristensen, M; Nøhr, C

    2000-01-01

    This paper describes the theory, method and recent results of a study developing methods for assessment of change readiness. The empirical focus is on development and implementation of clinical IT systems in the Danish healthcare sector. To assess change readiness, a questionnaire has been developed. The questionnaire has been tested in a hospital department as a part of a pre analysis related to development and implementation of an IT quality assurance system. The study shows a general positive attitude to the IT system and the organisational changes, related to the implementation and use of the system. It also supplies the project organisation with specific information, useful to the project organisation to continue the essential dialogue with the healthcare professionals during the change process. Furthermore it provides a useful tool for planning the ongoing developing processes. Several other healthcare organisations are at the moment entering the study.

  8. Applications of industrial engineering. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Yarbrough, Walthea V.

    1992-01-01

    Two separate and distinctly different projects are described within this paper: the stepping motion bearing tester, and the memo search and find project. The objective of the first project was to program the JSI Digital Servo Controller to control the motor using the stepping pattern prescribed by the AMSU-U2 Scan Profile. The objective of the second project was to develop a dBASE 3 Plus program that would allow the user to gain the necessary information to retrieve the memo(s) being sought upon supplying a word or group of words possibly found in the keyword list or upon supplying the author's name.

  9. Experiences in the Application of Project-Based Learning in a Switching-Mode Power Supplies Course

    ERIC Educational Resources Information Center

    Lamar, D. G.; Miaja, P. F.; Arias, M.; Rodriguez, A.; Rodriguez, M.; Vazquez, A.; Hernando, M. M.; Sebastian, J.

    2012-01-01

    This paper presents the introduction of problem-based learning (PBL) in a power electronics course at the University of Oviedo, Gijon, Spain, by means of two practical projects: the design and construction of a switching-mode power supply (SMPS) prototype and the static study of a dc-dc converter topology. The goal of this innovation was for…

  10. A new market risk model for cogeneration project financing---combined heat and power development without a power purchase agreement

    NASA Astrophysics Data System (ADS)

    Lockwood, Timothy A.

    Federal legislative changes in 2006 no longer entitle cogeneration project financings by law to receive the benefit of a power purchase agreement underwritten by an investment-grade investor-owned utility. Consequently, this research explored the need for a new market-risk model for future cogeneration and combined heat and power (CHP) project financing. CHP project investment represents a potentially enormous energy efficiency benefit through its application by reducing fossil fuel use up to 55% when compared to traditional energy generation, and concurrently eliminates constituent air emissions up to 50%, including global warming gases. As a supplemental approach to a comprehensive technical analysis, a quantitative multivariate modeling was also used to test the statistical validity and reliability of host facility energy demand and CHP supply ratios in predicting the economic performance of CHP project financing. The resulting analytical models, although not statistically reliable at this time, suggest a radically simplified CHP design method for future profitable CHP investments using four easily attainable energy ratios. This design method shows that financially successful CHP adoption occurs when the average system heat-to-power-ratio supply is less than or equal to the average host-convertible-energy-ratio, and when the average nominally-rated capacity is less than average host facility-load-factor demands. New CHP investments can play a role in solving the world-wide problem of accommodating growing energy demand while preserving our precious and irreplaceable air quality for future generations.

  11. Development of a Naval Supply Systems Command Acquisition Supplement - A Business Practice Improvement

    DTIC Science & Technology

    2015-09-01

    The information reviewed for this project will help the reader understand how acquisition rules and regulations flow down to the acquisition...ACQUISITIONS IN SUPPORT OF OPERATIONS IN AFGHANISTAN Aug-09 N Obsolete 09-26 PASSIVE RADIO FREQUENCY IDENTIFICATION ( RFID ) DFARS COMPLIANCE REPORTING...been made. Many of the instructions and publications refer readers to additional instructions and publications, and often reference specific policy

  12. Status of Natural Gas Pipeline System Capacity Entering the 2000-2001 Heating Season

    EIA Publications

    2000-01-01

    This special report looks at the capabilities of the national natural gas pipeline network in 2000 and provides an assessment of the current levels of available capacity to transport supplies from production areas to markets throughout the United States during the upcoming heating season. It also examines how completion of currently planned expansion projects and proposed new pipelines would affect the network.

  13. Year-End Review & FY15 Projections (Naval Supply Systems Command)

    DTIC Science & Technology

    2014-08-12

    Industries  and/or  socio-­‐economic  Concerns   Plan  to  Increase  SB  performance   Knowing our $mall Business SB – 26.0%, SDB ...26.0% SDB – 8.0% SDVOSB – 3.5% WOSB – 6.6% HUBZone – 0.6% Sweetspot – 81% N/A •  Expiring services contract deep-dive analysis initiative

  14. Mine Clearance Industry: Background, Geography, Funding, Analysis and Future Projections

    DTIC Science & Technology

    2007-12-01

    the targeting of food supplies to such an extreme (through widespread mining of agricultural areas and destruction of irrigation systems) that...UNOPS), Food and Agriculture Organization (FAO), Office for the Coordination of Humanitarian Affairs (OCHA), Office of the Special Adviser to the...U.N. High Commissioner for Refugees (UNHCR), World Food Program (WFP), World Health Organization (WHO), World Bank) on Mine Action before being

  15. Chips: A Tool for Developing Software Interfaces Interactively.

    DTIC Science & Technology

    1987-10-01

    of the application through the objects on the screen. Chips makes this easy by supplying simple and direct access to the source code and data ...object-oriented programming, user interface management systems, programming environments. Typographic Conventions Technical terms appearing in the...creating an environment in which we could do our work. This project could not have happened without him. Jeff Bonar started and managed the Chips

  16. Performance Based Logistics: Optimizing Total System Availability and Reducing Program Cost

    DTIC Science & Technology

    2011-03-14

    MONITOR’S REPORT Dr. Paul C. Jussel NUMBER(S) U.S. Army War College 12. DISTRIBUTION / AVAILABILITY STATEMENT Distribution Statement A...Colonel David M. Kaczmarski United States Army Dr. Paul C. Jussel Project Adviser This CRP is submitted in...8911927-1.html# (accessed 10 November 2010) 2 Hurst, Dana . Performance Based Logistics – A Bridge Between Acquisition Reform and Logistics Supply

  17. The Roland Maze Project — Cosmic Ray Registration at Schools

    NASA Astrophysics Data System (ADS)

    Feder, J.; JȨDRZEJCZAK, K.; Karczmarczyk, J.; Lewandowski, R.; Swarzyński, J.; Szabelska, B.; Szabelski, J.; Tokarski, P.; Wibig, T.

    Experimental studies of cosmic rays at the highest energies (above 1018 eV) are the main scientific goal of the projected large area network of extensive air shower detectors. Placing the detectors on the roofs of high school buildings will lower the cost by using the existing urban infrastructure (INTERNET, power supply, etc.), and can be a very efficient way of science popularisation by engaging high school students in the research program. 30 high schools in Łódź are already involved in the project. The project has recently obtained some financial support from the City Council of Łódź. The donation enabled us to start experimental work on detector construction details. A cycle of lectures and seminars devoted to different aspects of project realization (detector construction, on-line data acquisition system, C++ programming) has been organized for students at our Institute and at schools.

  18. Global supply chain management/transportation : building a global network of scholars and educators : phase I

    DOT National Transportation Integrated Search

    2008-01-01

    During the project period two conferences--1st Symposium and Workshop in Global : Supply Chain (http://www.business.utoledo.edu/scm) at University of Toledo, Toledo, : OH, USA (October 6-7, 2007) and 2nd Symposium and Workshop in Global Supply : Chai...

  19. 43 CFR 404.11 - What type of assistance is available under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.11 What type of assistance is available under the program? Under the Reclamation Rural Water Supply... rural water supply project for you, with your cooperation; (b) Request funding through a grant or...

  20. 20 CFR 435.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT... any other federally-sponsored project or program, the recipient may retain the supplies for use on non... recipient may not use supplies acquired with Federal funds to provide services to non-Federal outside...

  1. 20 CFR 435.35 - Supplies and other expendable property.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT... any other federally-sponsored project or program, the recipient may retain the supplies for use on non... recipient may not use supplies acquired with Federal funds to provide services to non-Federal outside...

  2. SWANN: The Snow Water Artificial Neural Network Modelling System

    NASA Astrophysics Data System (ADS)

    Broxton, P. D.; van Leeuwen, W.; Biederman, J. A.

    2017-12-01

    Snowmelt from mountain forests is important for water supply and ecosystem health. Along Arizona's Mogollon Rim, snowmelt contributes to rivers and streams that provide a significant water supply for hydro-electric power generation, agriculture, and human consumption in central Arizona. In this project, we are building a snow monitoring system for the Salt River Project (SRP), which supplies water and power to millions of customers in the Phoenix metropolitan area. We are using process-based hydrological models and artificial neural networks (ANNs) to generate information about both snow water equivalent (SWE) and snow cover. The snow-cover data is generated with ANNs that are applied to Landsat and MODIS satellite reflectance data. The SWE data is generated using a combination of gridded SWE estimates generated by process-based snow models and ANNs that account for variations in topography, forest cover, and solar radiation. The models are trained and evaluated with snow data from SNOTEL stations as well as from aerial LiDAR and field data that we collected this past winter in northern Arizona, as well as with similar data from other sites in the Southwest US. These snow data are produced in near-real time, and we have built a prototype decision support tool to deliver them to SRP. This tool is designed to provide daily-to annual operational monitoring of spatial and temporal changes in SWE and snow cover conditions over the entire Salt River Watershed (covering 17,000 km2), and features advanced web mapping capabilities and watershed analytics displayed as graphical data.

  3. Summary of aerospace and nuclear engineering activities

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The Texas A&M Nuclear and Aerospace engineering departments have worked on five different projects for the NASA/USRA Advanced Design Program during the 1987/88 year. The aerospace department worked on two types of lunar tunnelers that would create habitable space. The first design used a heated cone to melt the lunar regolith, and the second used a conventional drill to bore its way through the crust. Both used a dump truck to get rid of waste heat from the reactor as well as excess regolith from the tunneling operation. The nuclear engineering department worked on three separate projects. The NEPTUNE system is a manned, outer-planetary explorer designed with Jupiter exploration as the baseline mission. The lifetime requirement for both reactor and power-conversion systems was twenty years. The second project undertaken for the power supply was a Mars Sample Return Mission power supply. This was designed to produce 2 kW of electrical power for seven years. The design consisted of a General Purpose Heat Source (GPHS) utilizing a Stirling engine as the power conversion unit. A mass optimization was performed to aid in overall design. The last design was a reactor to provide power for propulsion to Mars and power on the surface. The requirements of 300 kW of electrical power output and a mass of less than 10,000 Rg were set. This allowed the reactor and power conversion unit to fit within the Space Shuttle cargo bay.

  4. Forecasting jobs in the supply chain for investments in residential energy efficiency retrofits in Florida

    NASA Astrophysics Data System (ADS)

    Fobair, Richard C., II

    This research presents a model for forecasting the numbers of jobs created in the energy efficiency retrofit (EER) supply chain resulting from an investment in upgrading residential buildings in Florida. This investigation examined material supply chains stretching from mining to project installation for three product types: insulation, windows/doors, and heating, ventilating, and air conditioning (HVAC) systems. Outputs from the model are provided for the project, sales, manufacturing, and mining level. The model utilizes reverse-estimation to forecast the numbers of jobs that result from an investment. Reverse-estimation is a process that deconstructs a total investment into its constituent parts. In this research, an investment is deconstructed into profit, overhead, and hard costs for each level of the supply chain and over multiple iterations of inter-industry exchanges. The model processes an investment amount, the type of work and method of contracting into a prediction of the number of jobs created. The deconstruction process utilizes data from the U.S. Economic Census. At each supply chain level, the cost of labor is reconfigured into full-time equivalent (FTE) jobs (i.e. equivalent to 40 hours per week for 52 weeks) utilizing loaded labor rates and a typical employee mix. The model is sensitive to adjustable variables, such as percentage of work performed per type of product, allocation of worker time per skill level, annual hours for FTE calculations, wage rate, and benefits. This research provides several new insights into job creation. First, it provides definitions that can be used for future research on jobs in supply chains related to energy efficiency. Second, it provides a methodology for future investigators to calculate jobs in a supply chain resulting from an investment in energy efficiency upgrades to a building. The methodology used in this research is unique because it examines gross employment at the sub-industry level for specific commodities. Most research on employment examines the net employment change (job creation less job destruction) at levels for regions, industries, and the aggregate economy. Third, it provides a forecast of the numbers of jobs for an investment in energy efficiency over the entire supply chain for the selected industries and the job factors for major levels of the supply chain.

  5. Linking climate projections to performance: A yield-based decision scaling assessment of a large urban water resources system

    NASA Astrophysics Data System (ADS)

    Turner, Sean W. D.; Marlow, David; Ekström, Marie; Rhodes, Bruce G.; Kularathna, Udaya; Jeffrey, Paul J.

    2014-04-01

    Despite a decade of research into climate change impacts on water resources, the scientific community has delivered relatively few practical methodological developments for integrating uncertainty into water resources system design. This paper presents an application of the "decision scaling" methodology for assessing climate change impacts on water resources system performance and asks how such an approach might inform planning decisions. The decision scaling method reverses the conventional ethos of climate impact assessment by first establishing the climate conditions that would compel planners to intervene. Climate model projections are introduced at the end of the process to characterize climate risk in such a way that avoids the process of propagating those projections through hydrological models. Here we simulated 1000 multisite synthetic monthly streamflow traces in a model of the Melbourne bulk supply system to test the sensitivity of system performance to variations in streamflow statistics. An empirical relation was derived to convert decision-critical flow statistics to climatic units, against which 138 alternative climate projections were plotted and compared. We defined the decision threshold in terms of a system yield metric constrained by multiple performance criteria. Our approach allows for fast and simple incorporation of demand forecast uncertainty and demonstrates the reach of the decision scaling method through successful execution in a large and complex water resources system. Scope for wider application in urban water resources planning is discussed.

  6. Integrated Water Basin Management Including a Large Pit Lake and a Water Supply Reservoir: The Mero-Barcés Basin

    NASA Astrophysics Data System (ADS)

    Delgado, Jordi; Juncosa-Rivera, Ricardo; Hernández-Anguiano, Horacio; Muñoz-Ibáñez, Andrea

    2016-04-01

    Water resource managers attempt to minimize conflicts among users, preserve the environment as much as possible, and satisfy user necessities at a minimum cost. Several European directives indirectly address mine restoration policies, with a goal of minimizing negative impacts and adding social and environmental value where possible. Water management must consider water sources, ecological flows, flood control, and variability in the demands for urban, industrial, and agricultural uses. In the context of the present study, the city of A Coruña is located in Galicia (NW Spain). The water supply system for this city and surrounding municipalities (~400.000 inhabitants) is based on the Abegondo-Cecebre reservoir. In cases when precipitation is scarce (e.g. no rain for more than seven consecutive months) and there is a seasonal increase in demand significantly stress the supply system so that, as occurred in 2010, shortages and water supply restrictions need to be considered. This is a clear indication of that, at present, the Abegondo-Cecebre reservoir has not enough capacity to cope with a scenario of increasing water demand (due to the vegetative and seasonal increase of population) and hydric stress likely connected with the widely acknowledged climate change. In the present context of monetary resources scarcity and society concern with respect large new public work projects, the construction of a new dam is challenging. However the opportunity provided by the recent flooding of the Meirama open pit (a large mine void that has been forced-flooded for its reclamation and it is located in the headwaters of one of the rivers draining towards the Abegondo-Cecebre reservoir) proves to be a significant new asset that will help to improve the future water management scenarios under the acknowledged uncertain conditions. In this study we have studied in detail the hydrochemistry of the affected systems (lake, river and reservoir) in order to make clear whether or not the use of lake water is acceptable from different points of view (water quality, legal constrains, etc.). Our results indicate that the joint use of the lake/reservoir system is feasible. Based on this and other complementary study, the basin water authorities has developed a project by which a 2.1 km uptake tunnel will be excavated in the next years to drain water from the lake towards the Barcés river and complement the water supply necessities of the Abegondo-Cecebre reservoir in case of hydric emergencies.

  7. The ACTwatch project: methods to describe anti-malarial markets in seven countries.

    PubMed

    Shewchuk, Tanya; O'Connell, Kathryn A; Goodman, Catherine; Hanson, Kara; Chapman, Steven; Chavasse, Desmond

    2011-10-31

    Policy makers, governments and donors are faced with an information gap when considering ways to improve access to artemisinin-based combination therapy (ACT) and malaria diagnostics including rapid diagnostic tests (RDTs). To help address some of these gaps, a five-year multi-country research project called ACTwatch was launched. The project is designed to provide a comprehensive picture of the anti-malarial market to inform national and international anti-malarial drug policy decision-making. The project is being conducted in seven malaria-endemic countries: Benin, Cambodia, the Democratic Republic of Congo, Madagascar, Nigeria, Uganda and Zambia from 2008 to 2012.ACTwatch measures which anti-malarials are available, where they are available and at what price and who they are used by. These indicators are measured over time and across countries through three study components: outlet surveys, supply chain studies and household surveys. Nationally representative outlet surveys examine the market share of different anti-malarials passing through public facilities and private retail outlets. Supply chain research provides a picture of the supply chain serving drug outlets, and measures mark-ups at each supply chain level. On the demand side, nationally representative household surveys capture treatment seeking patterns and use of anti-malarial drugs, as well as respondent knowledge of anti-malarials. The research project provides findings on both the demand and supply side determinants of anti-malarial access. There are four key features of ACTwatch. First is the overlap of the three study components where nationally representative data are collected over similar periods, using a common sampling approach. A second feature is the number and diversity of countries that are studied which allows for cross-country comparisons. Another distinguishing feature is its ability to measure trends over time. Finally, the project aims to disseminate findings widely for decision-making. ACTwatch is a unique multi-country research project that threads together anti-malarial supply and consumer behaviour to provide an evidence base to policy makers that can help determine where interventions may positively impact access to and use of quality-assured ACT and RDTs. Because of its ability to detect change over time, it is well suited to monitor the effects of policy or intervention developments in a country.

  8. The ACTwatch project: methods to describe anti-malarial markets in seven countries

    PubMed Central

    2011-01-01

    Background Policy makers, governments and donors are faced with an information gap when considering ways to improve access to artemisinin-based combination therapy (ACT) and malaria diagnostics including rapid diagnostic tests (RDTs). To help address some of these gaps, a five-year multi-country research project called ACTwatch was launched. The project is designed to provide a comprehensive picture of the anti-malarial market to inform national and international anti-malarial drug policy decision-making. Methods The project is being conducted in seven malaria-endemic countries: Benin, Cambodia, the Democratic Republic of Congo, Madagascar, Nigeria, Uganda and Zambia from 2008 to 2012. ACTwatch measures which anti-malarials are available, where they are available and at what price and who they are used by. These indicators are measured over time and across countries through three study components: outlet surveys, supply chain studies and household surveys. Nationally representative outlet surveys examine the market share of different anti-malarials passing through public facilities and private retail outlets. Supply chain research provides a picture of the supply chain serving drug outlets, and measures mark-ups at each supply chain level. On the demand side, nationally representative household surveys capture treatment seeking patterns and use of anti-malarial drugs, as well as respondent knowledge of anti-malarials. Discussion The research project provides findings on both the demand and supply side determinants of anti-malarial access. There are four key features of ACTwatch. First is the overlap of the three study components where nationally representative data are collected over similar periods, using a common sampling approach. A second feature is the number and diversity of countries that are studied which allows for cross-country comparisons. Another distinguishing feature is its ability to measure trends over time. Finally, the project aims to disseminate findings widely for decision-making. Conclusions ACTwatch is a unique multi-country research project that threads together anti-malarial supply and consumer behaviour to provide an evidence base to policy makers that can help determine where interventions may positively impact access to and use of quality-assured ACT and RDTs. Because of its ability to detect change over time, it is well suited to monitor the effects of policy or intervention developments in a country. PMID:22039780

  9. A framework for modeling anthropogenic impacts on waterbird habitats: addressing future uncertainty in conservation planning

    USGS Publications Warehouse

    Matchett, Elliott L.; Fleskes, Joseph P.; Young, Charles A.; Purkey, David R.

    2015-01-01

    The amount and quality of natural resources available for terrestrial and aquatic wildlife habitats are expected to decrease throughout the world in areas that are intensively managed for urban and agricultural uses. Changes in climate and management of increasingly limited water supplies may further impact water resources essential for sustaining habitats. In this report, we document adapting a Water Evaluation and Planning (WEAP) system model for the Central Valley of California. We demonstrate using this adapted model (WEAP-CVwh) to evaluate impacts produced from plausible future scenarios on agricultural and wetland habitats used by waterbirds and other wildlife. Processed output from WEAP-CVwh indicated varying levels of impact caused by projected climate, urbanization, and water supply management in scenarios used to exemplify this approach. Among scenarios, the NCAR-CCSM3 A2 climate projection had a greater impact than the CNRM-CM3 B1 climate projection, whereas expansive urbanization had a greater impact than strategic urbanization, on annual availability of waterbird habitat. Scenarios including extensive rice-idling or substantial instream flow requirements on important water supply sources produced large impacts on annual availability of waterbird habitat. In the year corresponding with the greatest habitat reduction for each scenario, the scenario including instream flow requirements resulted in the greatest decrease in habitats throughout all months of the wintering period relative to other scenarios. This approach provides a new and useful tool for habitat conservation planning in the Central Valley and a model to guide similar research investigations aiming to inform conservation, management, and restoration of important wildlife habitats.

  10. What to Do About Water.

    ERIC Educational Resources Information Center

    Goldin, Augusta

    1985-01-01

    Lists causes of freshwater supply depletion and successful reclamation projects including Imperial Dam in California, desalination in Arizona, and dual water supply in Florida. A national water policy is advocated. (DH)

  11. Status report on Project Hercules

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loree, D.; Giesselmann, M.; Kristiansen, M.

    1993-01-01

    Project Hercules is a project to improve ignitron switches which will then be used on the upgrade of Lawrence Livermore's Nova Laser for their ICF program. The goals of Hercules, which stands for High Energy Research Concerning the Ultimate Lifetime of Experimental Switches, are to lifetime test (up to 10,000 shots) prototype ignitrons or other switches with the required Nova current and coulomb parameters (300 kA, 200 C), recommend design changes, and retest the second generation switches. This report describes the design and construction of the test circuit and necessary diagnostics. The details of the design and construction of themore » test circuit and necessary diagnostics. The details of the design and construction of a 0.5 MJ electrolytic capacitor bank and a semi-automatic diagnostic/control system are described. The required test run data include peak current and corresponding tube voltage for every shot, entire current and voltage waveforms every few shots, and ignitor resistance values every few shots. Additionally, the conversion of a 120 kW, 12 kV constant voltage supply to an 8 A constant current supply with the use of six SCRs and a commercial control board will be described. The final results of this project will be lifetime data at high current and high coulomb for and improvements on some of the best of the new generation of pulsed power switches.« less

  12. Application of SAW method for multiple-criteria comparative analysis of the reliability of heat supply organizations

    NASA Astrophysics Data System (ADS)

    Akhmetova, I. G.; Chichirova, N. D.

    2016-12-01

    Heat supply is the most energy-consuming sector of the economy. Approximately 30% of all used primary fuel-and-energy resources is spent on municipal heat-supply needs. One of the key indicators of activity of heat-supply organizations is the reliability of an energy facility. The reliability index of a heat supply organization is of interest to potential investors for assessing risks when investing in projects. The reliability indices established by the federal legislation are actually reduced to a single numerical factor, which depends on the number of heat-supply outages in connection with disturbances in operation of heat networks and the volume of their resource recovery in the calculation year. This factor is rather subjective and may change in a wide range during several years. A technique is proposed for evaluating the reliability of heat-supply organizations with the use of the simple additive weighting (SAW) method. The technique for integrated-index determination satisfies the following conditions: the reliability level of the evaluated heat-supply system is represented maximum fully and objectively; the information used for the reliability-index evaluation is easily available (is located on the Internet in accordance with demands of data-disclosure standards). For reliability estimation of heat-supply organizations, the following indicators were selected: the wear of equipment of thermal energy sources, the wear of heat networks, the number of outages of supply of thermal energy (heat carrier due to technological disturbances on heat networks per 1 km of heat networks), the number of outages of supply of thermal energy (heat carrier due to technologic disturbances on thermal energy sources per 1 Gcal/h of installed power), the share of expenditures in the cost of thermal energy aimed at recovery of the resource (renewal of fixed assets), coefficient of renewal of fixed assets, and a coefficient of fixed asset retirement. A versatile program is developed and the analysis of heat-supply organizations is performed by the example of the Republic of Tatarstan. The assessment system is based on construction of comparative ratings of heat-supply organizations. A rating is the assessment of reliability of the organization, is characterized by a numerical value, and makes it possible to compare organizations engaged in the same kind of activity between each other.

  13. Evaluating the electricity intensity of evolving water supply mixes: the case of California’s water network

    NASA Astrophysics Data System (ADS)

    Stokes-Draut, Jennifer; Taptich, Michael; Kavvada, Olga; Horvath, Arpad

    2017-11-01

    Climate change is making water supply less predictable, even unreliable, in parts of the world. Urban water providers, especially in already arid areas, will need to diversify their water resources by switching to alternative sources and negotiating trading agreements to create more resilient and interdependent networks. The increasing complexity of these networks will likely require more operational electricity. The ability to document, visualize, and analyze water-energy relationships will be critical to future water planning, especially as data needed to conduct the analyses become increasingly available. We have developed a network model and decision-support tool, WESTNet, to perform these tasks. Herein, WESTNet was used to analyze a model of California’s 2010 urban water network as well as the projected system for 2020 and 2030. Results for California’s ten hydrologic regions show that the average number of water sources per utility and total electricity consumption for supplying water will increase in spite of decreasing per-capita water consumption. Electricity intensity (kWh m-3) will increase in arid regions of the state due to shifts to alternative water sources such as indirect potable water reuse, desalination, and water transfers. In wetter, typically less populated, regions, reduced water demand for electricity-intensive supplies will decrease the electricity intensity of the water supply mix, though total electricity consumption will increase due to urban population growth. The results of this study provide a baseline for comparing current and potential innovations to California’s water system. The WESTNet tool can be applied to diverse water systems in any geographic region at a variety of scales to evaluate an array of network-dependent water-energy parameters.

  14. Perspectives: Using Results from HRSA's Health Workforce Simulation Model to Examine the Geography of Primary Care.

    PubMed

    Streeter, Robin A; Zangaro, George A; Chattopadhyay, Arpita

    2017-02-01

    Inform health planning and policy discussions by describing Health Resources and Services Administration's (HRSA's) Health Workforce Simulation Model (HWSM) and examining the HWSM's 2025 supply and demand projections for primary care physicians, nurse practitioners (NPs), and physician assistants (PAs). HRSA's recently published projections for primary care providers derive from an integrated microsimulation model that estimates health workforce supply and demand at national, regional, and state levels. Thirty-seven states are projected to have shortages of primary care physicians in 2025, and nine states are projected to have shortages of both primary care physicians and PAs. While no state is projected to have a 2025 shortage of primary care NPs, many states are expected to have only a small surplus. Primary care physician shortages are projected for all parts of the United States, while primary care PA shortages are generally confined to Midwestern and Southern states. No state is projected to have shortages of all three provider types. Projected shortages must be considered in the context of baseline assumptions regarding current supply, demand, provider-service ratios, and other factors. Still, these findings suggest geographies with possible primary care workforce shortages in 2025 and offer opportunities for targeting efforts to enhance workforce flexibility. © Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  15. Food, forest wastes = low Btu fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goss, J.R.

    1978-01-01

    Development of an experimental gasifier at the Univ. of California at Davis is reviewed. The unit produces 6 to 8 million Btu/h by converting mulled walnut shells into a combustible gas. Experience gained in the project can be applied to other gasification projects. Three additional tests are planned for the pilot plant using densified rice hulls to supply heat for rice drying; using screened, densified gin trash to supply heat for a cotton gin; and using sawmill residues, primarily bark, to replace the natural gas fuel used in a dry kiln. After completion of these trials, further trials may includemore » burning cereal straw to power a diesel-electric generator for an irrigation project; burning timber harvesting residues to run a small municipal power plant; and supplying energy to operate a fuel cell pilot plant.« less

  16. Development of CMOS Imager Block for Capsule Endoscope

    NASA Astrophysics Data System (ADS)

    Shafie, S.; Fodzi, F. A. M.; Tung, L. Q.; Lioe, D. X.; Halin, I. A.; Hasan, W. Z. W.; Jaafar, H.

    2014-04-01

    This paper presents the development of imager block to be associated in a capsule endoscopy system. Since the capsule endoscope is used to diagnose gastrointestinal diseases, the imager block must be in small size which is comfortable for the patients to swallow. In this project, a small size 1.5V button battery is used as the power supply while the voltage supply requirements for other components such as microcontroller and CMOS image sensor are higher. Therefore, a voltage booster circuit is proposed to boost up the voltage supply from 1.5V to 3.3V. A low power microcontroller is used to generate control pulses for the CMOS image sensor and to convert the 8-bits parallel data output to serial data to be transmitted to the display panel. The results show that the voltage booster circuit was able to boost the voltage supply from 1.5V to 3.3V. The microcontroller precisely controls the CMOS image sensor to produce parallel data which is then serialized again by the microcontroller. The serial data is then successfully translated to 2fps image and displayed on computer.

  17. Small and Shaping the Future Energy Eco-house System

    NASA Astrophysics Data System (ADS)

    Furukawa, Ryuzo; Takahashi, Hideyuki; Sato, Yoshinori; Sasaki, Hiroshi; Isu, Norifumi; Ohtsuka, Masuo; Tohji, Kazuyuki

    2010-11-01

    The objective of this research is to develop the elemental technology of the small and thin energy collection system from water, wind, and others in the house, and examine them at the eco-house which will be built at Tohoku University on March 2010. This small energy storage system will contribute to reduce 10% of greenhouse gas emission from household electricity. This project is done by three following groups. 1st group (NEC-Tokin Co. Ltd.) will develop the technologies on the accumulation of electric power pressured from low electric power in which electricity is generated and on the cooperation with AC power supply used for domestic use for this eco-house system. 2nd group (INAX Co. Ltd.) will develop the elemental technology of the slight energy collection system from tap water in the home using a small hydroelectric generator for this eco-house system. 3rd group (Shoei Co. Ltd.) will develop the technologies on existent magnetic gear device, health appliances (Exercise bike), wind power generator, for this eco-house system. Tokoku University compiles these groups. Furthermore, I develop a search of unused small energy and the use technology, and propose a new energy supply system using solar cell and Li ion secondary battery.

  18. Affordable remote-area power supply in the Philippines

    NASA Astrophysics Data System (ADS)

    Heruela, C. S.

    The feasibility of photovoltaic (PV) systems for electrifying remote areas of the Philippines is discussed. In particular, a technical description is given of those PV systems that are appropriate to the needs of remote, but populated, rural areas and have been developed as part of the Philippine-German Solar Energy Project. Details are provided of a financing scheme, piloted by the Project on an unelectrified island, to make PV systems affordable to rural users. An analysis is presented of the potential of large-scale applications of PV systems in developing countries such as the Philippines, and a description is provided of current efforts to promote the use of such technology. A storage battery is identified as an essential component of a PV system. As a consequence, the wide use of PV systems will have a very significant impact on the market for storage batteries in countries embarking on PV-utilization programmes. It is clear, therefore, that battery manufacturers should take an interest in future development in PV applications.

  19. CONCEPTUAL DESIGN ASSESSMENT FOR THE COFIRING OF BIOREFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David J. Webster; Jeffrey T. Ranney; Jacqueline G. Broder

    2002-07-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed. Processing of biosolids and pilot facility hydrolysis production have been completed to produce lignin for cofire testing. EERC had received all the biomass and baseline coal fuels for use in testing. All the combustion and fuel handling tests at EERC have been completed. During fuel preparation EERC reported no difficulties in fuel blending and handling. Preliminary cofire test results indicate that the blending of lignin and biosolids with the Colbert coal blendmore » generally reduces NOx emissions, increases the reactivity of the coal, and increases the ash deposition rate on superheater surfaces. Deposits produced from the fuel blends, however, are more friable and hence easier to remove from tube surfaces relative to those produced from the baseline Colbert coal blend. A draft of the final cofire technical report entitled ''Effects of Cofiring Lignin and Biosolids with Coal on Fireside Performance and Combustion Products'' has been prepared and is currently being reviewed by project team members. A final report is expected by mid-third quarter 2002. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The environmental review, preferred steam supply connection points and steam pipeline routing, and assessment of steam export impacts have been completed without major issue. A cost estimate for the steam supply system was also completed. TVA is further evaluating the impacts of adding lignin to the coal fuel blend and how the steam cost is impacted by proximity of the Masada biomass facility. TVA has provided a draft final report that is under review by team members.« less

  20. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

Top