The impact of an acute care surgery team on general surgery residency.
Hatch, Quinton; McVay, Derek; Johnson, Eric K; Maykel, Justin A; Champagne, Bradley J; Steele, Scott R
2014-11-01
Acute care surgical teams (ACSTs) have limited data in residency. We sought to determine the impact of an ACST on the depth and breadth of general surgery resident training. One year prior to and after implementation of an ACST, Accreditation Council for Graduate Medical Education case logs spanning multiple postgraduate year levels were compared for numbers, case types, and complexity. We identified 6,009 cases, including 2,783 after ACST implementation. ACSTs accounted for 752 cases (27%), with 39.2% performed laparoscopically. ACST cases included biliary (19.4%), skin/soft tissue (10%), hernia (9.8%), and appendix (6.5%). Second-year residents performed a lower percentage of laparoscopic cases after the creation of the ACST (20.4% vs 26.3%; P = .003), while chief residents performed a higher percentage (42.1 vs 37.4; P = .04). Case numbers and complexity following ACST development were unchanged within all year groups (P > .1). ACST in a residency program does not sacrifice resident case complexity, diversity, or volume. Published by Elsevier Inc.
Kim, Yong-Won; Kang, Dong-Hun; Hwang, Jeong-Hyun; Park, Jaechan; Hwang, Yang-Ha; Kim, Yong-Sun
2013-08-01
Among the procedural complications related to carotid artery stenting (CAS), internal carotid artery (ICA) flow arrest is one of the most drastic complications, as it can cause major ischemic stroke. Acute carotid stent thrombosis (ACST) is a rare etiology of ICA flow arrest during carotid artery stenting with distal filter protection, but the most devastating. Moreover, no definitive management strategy has been established so far for treating ACST. We introduce a rescue management strategy for differential diagnosis of ICA flow arrest and for recanalization of ACST with a simple endovascular mechanical thrombectomy technique. In three cases of ICA flow arrest caused by ACST, selective angiography with a 1.7 F microcatheter provided confirmative diagnosis. Recanalization was then achieved with a Penumbra System (PS) reperfusion catheter using the forced arterial suction thrombectomy (FAST) technique. Successful recanalization with a Thrombolysis In Cerebral Infarction score of 3 was achieved for all three patients. Recanalization was confirmed with follow-up angiography at least 24 h after the procedure. No complications associated with this technique occurred. Based on our preliminary experiences, selective microangiography can be helpful for rapid diagnosis of ACST, and the present mechanical thrombectomy technique, using a modification of the PS, can play a role in adjuvant management or as a last resort for the treatment of ACST during CAS.
Status update and interim results from the asymptomatic carotid surgery trial-2 (ACST-2).
Halliday, Alison; Bulbulia, Richard; Gray, William; Naughten, Ally; den Hartog, Anne; Delmestri, Antonella; Wallis, Carol; le Conte, Stephanie; Macdonald, Sumaira
2013-11-01
ACST-2 is currently the largest trial ever conducted to compare carotid artery stenting (CAS) with carotid endarterectomy (CEA) in patients with severe asymptomatic carotid stenosis requiring revascularization. Patients are entered into ACST-2 when revascularization is felt to be clearly indicated, when CEA and CAS are both possible, but where there is substantial uncertainty as to which is most appropriate. Trial surgeons and interventionalists are expected to use their usual techniques and CE-approved devices. We report baseline characteristics and blinded combined interim results for 30-day mortality and major morbidity for 986 patients in the ongoing trial up to September 2012. A total of 986 patients (687 men, 299 women), mean age 68.7 years (SD ± 8.1) were randomized equally to CEA or CAS. Most (96%) had ipsilateral stenosis of 70-99% (median 80%) with contralateral stenoses of 50-99% in 30% and contralateral occlusion in 8%. Patients were on appropriate medical treatment. For 691 patients undergoing intervention with at least 1-month follow-up and Rankin scoring at 6 months for any stroke, the overall serious cardiovascular event rate of periprocedural (within 30 days) disabling stroke, fatal myocardial infarction, and death at 30 days was 1.0%. Early ACST-2 results suggest contemporary carotid intervention for asymptomatic stenosis has a low risk of serious morbidity and mortality, on par with other recent trials. The trial continues to recruit, to monitor periprocedural events and all types of stroke, aiming to randomize up to 5,000 patients to determine any differential outcomes between interventions. ISRCTN21144362. Copyright © 2013 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.
C-Band Airport Surface Communications System Standards Development, Phase I
NASA Technical Reports Server (NTRS)
Hall, Edward; Isaacs, James; Zelkin, Natalie; Henriksen. Steve
2010-01-01
This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." The proposed future C-band (5091- to 5150-MHz) airport surface communication system, referred to as the Aeronautical Mobile Airport Communications System (AeroMACS), is anticipated to increase overall air-to-ground data communications systems capacity by using a new spectrum (i.e., not very high frequency (VHF)). Although some critical services could be supported, AeroMACS will also target noncritical services, such as weather advisory and aeronautical information services as part of an airborne System Wide Information Management (SWIM) program. AeroMACS is to be designed and implemented in a manner that will not disrupt other services operating in the C-band. This report defines the AeroMACS concepts of use, high-level system requirements, and architecture; the performance of supporting system analyses; the development of AeroMACS test and demonstration plans; and the establishment of an operational AeroMACS capability in support of C-band aeronautical data communications standards to be advanced in both international (International Civil Aviation Organization, ICAO) and national (RTCA) forums. This includes the development of system parameter profile recommendations for AeroMACS based on existing Institute of Electrical and Electronics Engineering (IEEE) 802.16e- 2009 standards
Choices of Stent and Cerebral Protection in the Ongoing ACST-2 Trial: A Descriptive Study.
de Waard, D D; Halliday, A; de Borst, G J; Bulbulia, R; Huibers, A; Casana, R; Bonati, L H; Tolva, V
2017-05-01
Several plaque and lesion characteristics have been associated with an increased risk for procedural stroke during or shortly after carotid artery stenting (CAS). While technical advancements in stent design and cerebral protection devices (CPD) may help reduce the procedural stroke risk, and anatomy remains important, tailoring stenting procedures according to plaque and lesion characteristics might be a useful strategy in reducing stroke associated with CAS. In this descriptive report of the ongoing Asymptomatic Carotid Surgery Trial-2 (ACST-2), it was assessed whether choice for stent and use or type of CPD was influenced by plaque and lesion characteristics. Trial patients who underwent CAS between 2008 and 2015 were included in this study. Chi-square statistics were used to study the effects of plaque echolucency, ipsilateral preocclusive disease (90-99%), and contralateral high-grade stenosis (>50%) or occlusion of the carotid artery on interventionalists' choice for stent and CPD. Differences in treatment preference between specialties were also analysed. In this study, 831 patients from 88 ACST-2 centres were included. Almost all procedures were performed by either interventional radiologists (50%) or vascular surgeons (45%). Plaque echolucency, ipsilateral preocclusive disease (90-99%), and significant contralateral stenosis (>50%) or occlusion did not affect the choice of stent or either the use of cerebral protection and type of CPD employed (i.e., filter/flow reversal). Vascular surgeons used a CPD significantly more often than interventional radiologists (98.6% vs. 76.3%; p < .001), but this choice did not appear to be dependent on patient characteristics. In ACST-2, plaque characteristics and severity of stenosis did not primarily determine interventionalists' choice of stent or use or type of CPD, suggesting that other factors, such as vascular anatomy or personal and centre preference, may be more important. Stent and CPD use was highly heterogeneous among participating European centres. Copyright © 2017 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Zelkin, Natalie; Henriksen, Stephen
2011-01-01
This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.
NASA Technical Reports Server (NTRS)
Zelkin, Natalie; Henriksen, Stephen
2011-01-01
This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents a preliminary safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the L-band communication system after the technology is chosen and system rollout timing is determined. The security risk analysis resulted in identifying main security threats to the proposed system as well as noting additional threats recommended for a future security analysis conducted at a later stage in the system development process. The document discusses various security controls, including those suggested in the COCR Version 2.0.
Beane, A; Padeniya, A; De Silva, A P; Stephens, T; De Alwis, S; Mahipala, P G; Sigera, P C; Munasinghe, S; Weeratunga, P; Ranasinghe, D; Deshani, E M; Weerasinghe, T; Thilakasiri, K; Jayasinghe, Kas; Dondorp, A M; Haniffa, R
2017-10-01
The Good Intern Programme (GIP) in Sri Lanka has been implemented to bridge the 'theory to practice gap' of doctors preparing for their internship. This paper evaluates the impact of a 2-day peer-delivered Acute Care Skills Training (ACST) course as part of the GIP. The ACST course was developed by an interprofessional faculty, including newly graduated doctors awaiting internship (pre-intern), focusing on the recognition and management of common medical and surgical emergencies. Course delivery was entirely by pre-intern doctors to their peers. Knowledge was evaluated by a pre- and post-course multiple choice test. Participants' confidence (post-course) and 12 acute care skills (pre- and post-course) were assessed using Likert scale-based questions. A subset of participants provided feedback on the peer learning experience. Seventeen courses were delivered by a faculty consisting of eight peer trainers over 4 months, training 320 participants. The mean (SD) multiple choice questionnaire score was 71.03 (13.19) pre-course compared with 77.98 (7.7) post-course (p<0.05). Increased overall confidence in managing ward emergencies was reported by 97.2% (n=283) of respondents. Participants rated their post-course skills to be significantly higher (p<0.05) than pre-course in all 12 assessed skills. Extended feedback on the peer learning experience was overwhelmingly positive and 96.5% would recommend the course to a colleague. A peer-delivered ACST course was extremely well received and can improve newly qualified medical graduates' knowledge, skills and confidence in managing medical and surgical emergencies. This peer-based model may have utility beyond pre-interns and beyond Sri Lanka. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
NASA Technical Reports Server (NTRS)
Hall, Edward; Magner, James
2011-01-01
This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II (this document) describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.
NASA Technical Reports Server (NTRS)
Hall, Edward; Isaacs, James; Henriksen, Steve; Zelkin, Natalie
2011-01-01
This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I (this document) is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.
L-Band System Engineering - Concepts of Use, Systems Performance Requirements, and Architecture
NASA Technical Reports Server (NTRS)
Henriksen, Stephen; Zelkin, Natalie
2011-01-01
This document is being provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-band and L-band Communications Standard Development. Task 7 was motivated by the five year technology assessment performed for the Federal Aviation Administration (FAA) under the joint FAA-EUROCONTROL cooperative research Action Plan (AP-17), also known as the Future Communications Study (FCS). It was based on direction provided by the FAA project-level agreement (PLA FY09_G1M.02-02v1) for "New ATM Requirements-Future Communications." Task 7 was separated into two distinct subtasks, each aligned with specific work elements and deliverable items. Subtask 7-1 addressed C-band airport surface data communications standards development, systems engineering, test bed development, and tests/demonstrations to establish operational capability for what is now referred to as the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2, which is the subject of this report, focused on preliminary systems engineering and support of joint FAA/EUROCONTROL development and evaluation of a future L-band (960 to 1164 MHz) air/ground (A/G) communication system known as the L-band digital aeronautical communications system (L-DACS), which was defined during the FCS. The proposed L-DACS will be capable of providing ATM services in continental airspace in the 2020+ timeframe. Subtask 7-2 was performed in two phases. Phase I featured development of Concepts of Use, high level functional analyses, performance of initial L-band system safety and security risk assessments, and development of high level requirements and architectures. It also included the aforementioned support of joint L-DACS development and evaluation, including inputs to L-DACS design specifications. Phase II provided a refinement of the systems engineering activities performed during Phase I, along with continued joint FAA/EUROCONTROL L-DACS development and evaluation support.
1942-01-01
ONLY; ADMINISTRATIVE/OPERATIONAL USE; 03 MAR 1999. OTHER REQUESTS SHALL BE REFERRED THROUGH COMMANDING OFFICER, NAVAL RESEARCH LAB , WASHINGTON, DC 20375...Used as Glow Tube Voltage + " -- -+a...... .-..... . .... . . . . . .. . . Plate 41. Tar of aCotrolust Voltaep with Gas Pressure lab A-gtarator of’ Plate...construation cf vapor comatera. Acst Lay metal wll menru as cathode aterial, but oxidiste copper Lad bras han given beest res-ts. fe ride choice of
78 FR 72572 - Operational Contract Support
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
... 0790-AI48 Operational Contract Support AGENCY: Department of Defense (DoD). ACTION: Final rule. SUMMARY: This rule establishes policy, assigns responsibilities, and provides procedures for operational contract support (OCS), including OCS program management, contract support integration, and integration of...
Operational Contract Support: Economic Impact Evaluation and Measures of Effectiveness
2017-12-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES...DATES COVERED MBA professional report 4. TITLE AND SUBTITLE OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES OF EFFECTIVENESS 5...evaluation, expeditionary economics , operational contract support, measure of effectiveness 15. NUMBER OF PAGES 89 16. PRICE CODE 17. SECURITY
Flawed Execution: A Case Study on Operational Contract Support
2016-06-01
NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA JOINT APPLIED PROJECT FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT June 2016...applied project 4. TITLE AND SUBTITLE FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT 5. FUNDING NUMBERS 6. AUTHOR(S) Scott F...unlimited FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT Scott F. Taggart, Captain, United States Marine Corps Jacob Ledford
48 CFR 215.404-2 - Data to support proposal analysis.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Data to support proposal... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.404-2 Data to support proposal analysis. See PGI 215.404-2 for guidance on obtaining...
48 CFR 215.404-2 - Data to support proposal analysis.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Data to support proposal... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.404-2 Data to support proposal analysis. See PGI 215.404-2 for guidance on obtaining...
Code of Federal Regulations, 2010 CFR
2010-10-01
... installation support services (cost-reimbursement contracts). 5152.245-9001 Section 5152.245-9001 Federal... CONTRACT CLAUSES 5152.245-9001 Government property for installation support services (cost-reimbursement contracts). As prescribed in 5145.302-3(S-91), insert the following clause: Government Property for...
48 CFR 15.404-2 - Data to support proposal analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Data to support proposal analysis. 15.404-2 Section 15.404-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-2 Data to support proposal analysis. (a) Field pricing...
Exchange relationships: examining psychological contracts and perceived organizational support.
Coyle-Shapiro, Jacqueline A-M; Conway, Neil
2005-07-01
The authors surveyed 347 public sector employees on 4 measurement occasions to investigate the conceptual distinctiveness of the psychological contract and perceived organizational support (POS) and how they are associated over time. Results support the distinctiveness of the 2 concepts. In terms of their interrelationships over time, by drawing on psychological contract theory the authors found little support for a reciprocal relationship between POS and psychological contract fulfillment. Under an alternative set of hypotheses, by drawing on organizational support theory and by separating psychological contract fulfillment into its 2 components (perceived employer obligations and inducements), the authors found that perceived employer inducements were positively related to POS, which, in turn, was negatively related to perceived employer obligations. The results suggest that POS and the components of psychological contract fulfillment are more important in predicting organizational citizenship behavior than psychological contract fulfillment. Copyright 2005 APA, all rights reserved.
Federal Research and Development Contract Trends and the Supporting Industrial Base, 2000-2014
2016-04-30
Homeland Security, and government-wide services contracting trends; sourcing policy and cost estimation methodologies; and recent U.S. Army modernization ...been fears that the sharp downturn in federal contract obligations would disproportionately impact the R&D contracting portfolios within individual...329 - contracting portfolios , and the industrial base that supports those efforts, within each R&D contracting agency. The main finding of this
Code of Federal Regulations, 2012 CFR
2012-07-01
... routinely are put in place to provide support to many newly fielded weapons systems, including aircraft, land combat vehicles, and automated command and control systems. Systems support contracting authority... generally has less control over systems support contracts than other types of contracts. Theater business...
Code of Federal Regulations, 2014 CFR
2014-07-01
... routinely are put in place to provide support to many newly fielded weapons systems, including aircraft, land combat vehicles, and automated command and control systems. Systems support contracting authority... generally has less control over systems support contracts than other types of contracts. Theater business...
Code of Federal Regulations, 2013 CFR
2013-07-01
... routinely are put in place to provide support to many newly fielded weapons systems, including aircraft, land combat vehicles, and automated command and control systems. Systems support contracting authority... generally has less control over systems support contracts than other types of contracts. Theater business...
Dual Support in Contract Workers' Triangular Employment Relationships
ERIC Educational Resources Information Center
Buch, Robert; Kuvaas, Bard; Dysvik, Anders
2010-01-01
This study investigated the interplay between perceived investment in contract worker development by the "client" organization and contract workers' perceived organizational support from their temporary employment "agency." A study among 2021 contract workers from three temporary employment agencies in Norway showed that the…
48 CFR 915.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...
48 CFR 915.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...
48 CFR 915.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...
48 CFR 915.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...
Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)
NASA Technical Reports Server (NTRS)
Vandenberg, N. R.; Ma, C. (Technical Monitor)
2002-01-01
This final report summarizes the accomplishments during the contract period. Under the contract Nepal, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during high geodetic and astrometric VLBI evolved through several major changes. This report is divided into five sections that correspond to major task areas in the contract: A) Coordination rid Scheduling, B) Field System, CN Station Support, D) Analysis and Research and Development, and E) Computer Support.
2016-11-01
Target Attack Radar System Objective We determined whether the Air Force made cost-effective purchases on the performance-based logistics contract to... contract to Northrop Grumman Corporation to provide Total System Support Responsibility services to sustain 16 E-8C JSTARS aircraft. These services...customer support. The Total System Support Responsibility contract is valued at $7 billion, with a 6-year base period and 16 annual contract option
2017-03-07
H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee
77 FR 41809 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-16
..., Lockheed Martin IS&GS, Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO 80112-3938. Activity..., Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO 80112-3938. Activity for Which Permit Is.... Applicant: Celia Lang, Lockheed Martin IS&GS, Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO...
1981-09-04
begin necessary negotiations for initial long-term contracts. Third, the term "offer" is not defined in the Act. Under general contract law , a valid...The position that the Administrator must offer coplete and definite contracts within 9 months of December 5, 1980, is supported by general contract law definitions...conititute "offers" in contract law . This interpretation is supported by Williston, who states that an offer is always a conditional promise, which wll
Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)
NASA Technical Reports Server (NTRS)
Vandenberg, Nancy R.; Ma, C. (Technical Monitor)
2001-01-01
This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.
Support for the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)
NASA Technical Reports Server (NTRS)
Ma, C. (Technical Monitor)
2001-01-01
This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.
Maintenance and Drainage Guidance for the Scott Base Transition, Antarctica
2014-10-01
Way Centennial , CO 80112-3938 Final Report Approved for public release; distribution is unlimited. Prepared for National Science Foundation...References Antarctic Support Contract (ASC). 2014. Scott Base Transition Construction and Maintenance Manual. IO-MAN-0003. Centennial , CO: Antarctic...Support Contract. Antarctic Support Contract (ASC). Forthcoming. Snow Road Construction and Maintenance Manual. IO-MAN-xx. Centennial , CO: Antarctic
Sustaining Financial Support through Workforce Development Grants and Contracts
ERIC Educational Resources Information Center
Brumbach, Mary A.
2005-01-01
Workforce development grants and contracts are important methods for sustaining financial support for community colleges. This chapter details decision factors, college issues, possible pitfalls, and methods for procuring and handling government contracts and grants for workforce training.
Special environmental control and life support equipment test analyses and hardware
NASA Technical Reports Server (NTRS)
Callahan, David M.
1995-01-01
This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.
An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives
2016-09-01
education/ training , communication, staff levels, oversight, and leadership support by comparing and contrasting Army COR contract administration...processes from a CONUS and OCONUS perspective. The results inform Army Contracting leadership about differences and discrepancies that exist in the training ...five common COR issues that need to be addressed: education/ training , communication, staff Levels, oversight, and leadership support. We found that
How Can We Best Achieve Contracting Unity of Effort in the CENTCOM Area of Responsibility?
2013-12-01
3 2. Literature Review ................................................................................3 3. Interview Design and...2010, JCC-I/A was re- designated as the Central Command Joint Theater Support Contracting Command (C-JTSCC). Although the military has used...provision of integrated contracted support and management of contractor personnel providing that support to the joint force in a designated operational
An Analysis Of Cyber Security And How It Is Affecting A Contract Writing System, Seaport
2016-06-01
CONTRACT WRITING SYSTEM, SEAPORT June 2016 By: Bill Turner Daniel Belcher Danielle Allen Advisors: Raymond Jones Stacy McQuage...A CONTRACT WRITING SYSTEM, SEAPORT 5. FUNDING NUMBERS 6. AUTHOR(S) Bill Turner, Daniel Belcher, & Danielle Allen 7. PERFORMING ORGANIZATION NAME(S...business support for the DOD—specifically, the contract writing system SeaPort. Is cybersecurity becoming too restrictive, making the ability to support the
Preaward Evaluation and Responsibility Determination of Foreign Contractors.
1988-12-01
abroad. In fiscal year 1987 (FY 87) alone more than $2.1 billion in DOD contracts (exclusive of subsistence, petroleum, construction and support services...dollars. More than $1.1 billion in DOD contracts and subcontracts (exclusive of subsistence, petroleum, construction and support services) were awarded to...Germany, in FY 87 [Ref. 21. Significant amounts in construction and base services contracts are also awarded yearly to support American troops stationed
Atkinson, Theresa P; Matthews, Russell A; Henderson, Alexandra A; Spitzmueller, Christiane
2018-01-30
Grounded in affective events theory, we investigated the effects of experimentally manipulated psychological contract breaches on participants' feelings of violation, subsequent perceptions of psychological contract strength, and organizational citizenship behaviours in a sample of working adults. Results support previous findings that pre-existing relational psychological contract strength interacts with severity of unmet promises or expectations. Specifically, individuals with high relational contracts who experience low severity of unmet promises/expectations have the lowest breach perceptions, whereas individuals with high relational contracts who experience more severe levels unmet promises/expectations experience the highest level of breach perceptions. Results also support the concept of a breach spiral in that prior perceptions of breach led to an increased likelihood of subsequent perceptions of breach following the experimental manipulation. Furthermore, consistent with affective events theory, results support the argument that a psychological contract breach's effect on specific organizational citizenship behaviours is mediated by feelings of violation and the reassessment of relational contracts. These effects were present even after controlling for the direct effects of the manipulated severity of unmet promises/expectations. Copyright © 2018 John Wiley & Sons, Ltd.
NAVSUP Global Logistics Support
2012-08-01
Support $3.5 M Ill SB Contracting Actions Ill SB Value 35% of total spend to Small Business ! NAVAL SUPPLY SYSTEMS COMMAND • Procurement • Barge...Other services now using as well • Awarded Aug 2011, Features: • 100% Sma II Business Set Aside ! • 25 multiple award task order contracts to 8...UP- GLOBAL LOGISTICS I · -~ --; •• ~.c. SUPPORT ,.. NAVAL SUPPLY SYSTEMS COMMAND Fiscal Year 2011 Small Business Contracting Spend: 28,000 actions
48 CFR 39.107 - Contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information... information technology services or support services. [61 FR 41470, Aug. 8, 1996. Redesignated at 62 FR 274...
Code of Federal Regulations, 2011 CFR
2011-10-01
... contracting officer. An example of a circumstance that may support a determination not to evaluate offers for... 17.206 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 17.206 Evaluation. (a) In awarding the basic contract...
NASA Technical Reports Server (NTRS)
Kelly, Michael P.
2011-01-01
Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)
Space Transportation Systems Technologies
NASA Technical Reports Server (NTRS)
Laue, Jay H.
2001-01-01
This document is the final report by the Science Applications International Corporation (SAIC) on contracted support provided to the National Aeronautics and Space Administration (NASA) under Contract NAS8-99060, 'Space Transportation Systems Technologies'. This contract, initiated by NASA's Marshall Space Flight Center (MSFC) on February 8, 1999, was focused on space systems technologies that directly support NASA's space flight goals. It was awarded as a Cost-Plus-Incentive-Fee (CPIF) contract to SAIC, following a competitive procurement via NASA Research Announcement, NRA 8-21. This NRA was specifically focused on tasks related to Reusable Launch Vehicles (RLVs). Through Task Area 3 (TA-3), "Other Related Technology" of this NRA contract, SAIC extensively supported the Space Transportation Directorate of MSFC in effectively directing, integrating, and setting its mission, operations, and safety priorities for future RLV-focused space flight. Following an initially contracted Base Year (February 8, 1999 through September 30, 1999), two option years were added to the contract. These were Option Year 1 (October 1, 1999 through September 30, 2000) and Option Year 2 (October 1, 2000 through September 30, 2001). This report overviews SAIC's accomplishments for the Base Year, Option Year 1, and Option Year 2, and summarizes the support provided by SAIC to the Space Transportation Directorate, NASA/MSFC.
48 CFR 3004.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Supporting closeout documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND... Contract Files 3004.804-570 Supporting closeout documents. (a) When applicable and prior to contract...
48 CFR 3004.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Supporting closeout documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND... Contract Files 3004.804-570 Supporting closeout documents. (a) When applicable and prior to contract...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 17.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.601 Definition. Management..., maintenance, or support, on its behalf, of a Government-owned or -controlled research, development, special...
Commerical Remote Sensing Data Contract
,
2005-01-01
The U. S. Geological Survey's (USGS) Commercial Remote Sensing Data Contracts (CRSDCs) provide government agencies with access to a broad range of commercially available remotely sensed airborne and satellite data. These contracts were established to support The National Map partners, other Federal Civilian agency programs, and Department of Defense programs that require data for the United States and its territories. Experience shows that centralized procurement of remotely sensed data leads to considerable cost savings to the Federal government through volume discounts, reduction of redundant contract administrative costs, and avoidance of duplicate purchases. These contracts directly support the President's Commercial Remote Sensing Space Policy, signed in 2003, by providing a centralized mechanism for civil agencies to acquire commercial remote sensing products to support their mission needs in an efficient and coordinated way. CRSDC administration is provided by the USGS Mid-Continent Mapping Center in Rolla, Missouri.
When Disaster Strikes Is Logistics and Contracting Support Ready?
2011-09-27
improve response in the event of an actual crisis . The Defense Contingency Contracting Handbook (Christianson, A., Coombs , J., Harbin, S., Ingram...AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Recent crisis responses, including the...and management of the DoD?s logistics and contracting support for contingency, expeditionary, and crisis response, and provide specific recommendations
Teacher Views on Organizational Support and Psychological Contract Violation
ERIC Educational Resources Information Center
Argon, Türkan; Ekinci, Serkan
2017-01-01
This study aimed to determine the relationship between secondary school teachers' view regarding Organizational Support and Psychological Contract Violation. The study conducted with relational screening model included 230 secondary school teachers employed in Bolu central district in 2014-2015 academic year. Perceived Organizational Support Scale…
Insurance Contract Analysis for Company Decision Support in Acquisition Management
NASA Astrophysics Data System (ADS)
Chernovita, H. P.; Manongga, D.; Iriani, A.
2017-01-01
One of company activities to retain their business is marketing the products which include in acquisition management to get new customers. Insurance contract analysis using ID3 to produce decision tree and rules to be decision support for the insurance company. The decision tree shows 13 rules that lead to contract termination claim. This could be a guide for the insurance company in acquisition management to prevent contract binding with these contract condition because it has a big chance for the customer to terminate their insurance contract before its expired date. As the result, there are several strong points that could be the determinant of contract termination such as: 1) customer age whether too young or too old, 2) long insurance period (above 10 years), 3) big insurance amount, 4) big amount of premium charges, and 5) payment method.
48 CFR 2015.305 - Proposal evaluation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection Processes and Techniques 2015.305 Proposal evaluation. The contracting officer may provide offerors' cost proposals and supporting financial...
1984-09-01
Harms, Assistant Director for Management Support, and LT% Mike Deems, who was the Contracting Officer’s Representative for the HERO contract. COMMENTS...A1ND gJESTIONS may be directed to US Army Concep*s Aialysis Agency, ATTN: Assistint Director for Management Support, 8120 .uodriont Avenue, Bethesda...APPENDIX A STUDY CONTRIBUTORS 1. STUDY TEAM. Management and Support Directorate. Report Author: Lelma M. Harms Contract COTR: LTC J. M. Deems 2. EXTERNAL
48 CFR 970.1504-2 - Price negotiation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...
48 CFR 970.1504-2 - Price negotiation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...
48 CFR 970.1504-2 - Price negotiation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...
48 CFR 970.1504-2 - Price negotiation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...
48 CFR 970.1504-2 - Price negotiation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...
24 CFR 882.403 - ACC, housing assistance payments contract, and lease.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DIRECT LOAN PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE... contracted for is the total of the Moderate Rehabilitation Fair Market Rents for all the units. The fee for...
Code of Federal Regulations, 2013 CFR
2013-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Code of Federal Regulations, 2012 CFR
2012-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
Code of Federal Regulations, 2014 CFR
2014-07-01
... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...
ERIC Review: The Impact of Financial Crisis on Access and Support Services in Community Colleges.
ERIC Educational Resources Information Center
Sheldon, Caroline Q.
2003-01-01
Discusses the impact of fiscal contraction on community colleges. Explores how reduced state appropriations have adversely affected community college instruction and student support systems. Research shows that because instruction and student support services suffer when budget is reduced, fiscal contraction can hamper the ability of colleges to…
76 FR 18189 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
...: Professional Contract Services, Inc., Austin, TX. Contracting Activity: Dept of the Army, XR W40M Natl Region Contract OFC, Washington, DC. Service Type/Location: Prime Vendor Support for Foreign Military Sales...
46 CFR 154.432 - Expansion and contraction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Membrane Tanks § 154.432 Expansion and contraction. The support system of a membrane tank must allow for thermal and physical expansion and contraction of the tank. Semi-Membrane Tanks ... 46 Shipping 5 2011-10-01 2011-10-01 false Expansion and contraction. 154.432 Section 154.432...
46 CFR 154.432 - Expansion and contraction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Membrane Tanks § 154.432 Expansion and contraction. The support system of a membrane tank must allow for thermal and physical expansion and contraction of the tank. Semi-Membrane Tanks ... 46 Shipping 5 2010-10-01 2010-10-01 false Expansion and contraction. 154.432 Section 154.432...
29 CFR 4.163 - Section 4(c) of the Act.
Code of Federal Regulations, 2013 CFR
2013-07-01
... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...
29 CFR 4.163 - Section 4(c) of the Act.
Code of Federal Regulations, 2012 CFR
2012-07-01
... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...
29 CFR 4.163 - Section 4(c) of the Act.
Code of Federal Regulations, 2014 CFR
2014-07-01
... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...
29 CFR 4.163 - Section 4(c) of the Act.
Code of Federal Regulations, 2011 CFR
2011-07-01
... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...
48 CFR 1552.209-74 - Limitation of future contracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... an equal basis with other companies. (b) The Contractor will be ineligible to enter into a contract... subcontract under an EPA contract, which supports EPA's performance of Superfund Headquarters policy work... contract requires access to proprietary or confidential business or financial data of other companies, and...
48 CFR 1022.7000 - Contract clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... MINORITY AND WOMEN INCLUSION Fair inclusion of minorities and women 1022.7000 Contract clause. Insert the clause at 1052.222-70, Minority and Women Inclusion, in all solicitations and contracts in support of...
NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project
NASA Technical Reports Server (NTRS)
Wilson, Scott D.; Wong, Wayne A.
2015-01-01
A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.
Stephanie A. Snyder; Keith D. Stockmann; Gaylord E. Morris
2012-01-01
The US Forest Service used contracted helicopter services as part of its wildfire suppression strategy. An optimization decision-modeling system was developed to assist in the contract selection process. Three contract award selection criteria were considered: cost per pound of delivered water, total contract cost, and quality ratings of the aircraft and vendors....
Mechanisms test bed math model modification and simulation support
NASA Technical Reports Server (NTRS)
Gilchrist, Andrea C.; Tobbe, Patrick A.
1995-01-01
This report summarizes the work performed under contract NAS8-38771 in support of the Marshall Space Flight Center Six Degree of Freedom Motion Facility and Flight Robotics Laboratory. The contract activities included the development of the two flexible body and Remote Manipulator System simulations, Dynamic Overhead Target Simulator control system and operating software, Global Positioning System simulation, and Manipulator Coupled Spacecraft Controls Testbed. Technical support was also provided for the Lightning Imaging Sensor and Solar X-Ray Imaging programs. The cover sheets and introductory sections for the documentation written under this contract are provided as an appendix.
48 CFR 217.173 - Multiyear contracts for weapon systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... weapon systems. 217.173 Section 217.173 Federal Acquisition Regulations System DEFENSE ACQUISITION... Mulityear Contracting 217.173 Multiyear contracts for weapon systems. As authorized by 10 U.S.C. 2306b(h... contract for— (a) A weapon system and associated items, services, and logistics support for a weapon system...
26 CFR 1.141-5 - Private loan financing test.
Code of Federal Regulations, 2010 CFR
2010-04-01
... lease or other contractual arrangement (for example, a management contract or an output contract) may in... person. Similarly, an output contract or a management contract with respect to a financed facility... (2) Updates or maintenance or support services with respect to computer software; and (B) The same...
48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...
48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...
48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...
48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...
48 CFR 5145.302-3 - Other contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Other contracts. 5145.302... REGULATIONS GOVERNMENT PROPERTY 5145.302-3 Other contracts. (S-90)(1) When it is determined that contractor... installation support services contracts, is in the best interest of the Government, the Government facilities...
2013-06-26
in the Contract 5 Army Regulation Contradicts Federal Acquisition Regulation Requirement 6 Medical Malpractice Liability...to reflect the requirements in FAR subpart 37.4. Medical Malpractice Liability Transferred to the Government By allowing the ASG-QA command...surgeon to supervise the contractor physician assistants, contracting officials may have transferred the risk of liability for medical 7 malpractice
Project Management and Systems Engineering Guide. Second Edition
1989-09-30
depend on the type of requirement. In general, opera- tional requirements will fall into one of the following categories : 1. Replacement of an existing...Warranty service and maintenance contracts also fall into this support category . The planning for phase-in type support must be accomplished during the...fixed-price incentive (FPI). The second general category of contracts is cost reimbursement. Under a cost- type contract, the product is not paid for on
NASA Extends Chandra Science and Operations Support Contract
NASA Astrophysics Data System (ADS)
2010-01-01
NASA has extended a contract with the Smithsonian Astrophysical Observatory in Cambridge, Mass., to provide science and operational support for the Chandra X-ray Observatory, a powerful tool used to better understand the structure and evolution of the universe. The contract extension with the Smithsonian Astrophysical Observatory provides continued science and operations support to Chandra. This approximately 172 million modification brings the total value of the contract to approximately 545 million for the base effort. The base effort period of performance will continue through Sept. 30, 2013, except for the work associated with the administration of scientific research grants, which will extend through Feb. 28, 2016. The contract type is cost reimbursement with no fee. In addition to the base effort, the contract includes two options for three years each to extend the period of performance for an additional six years. Option 1 is priced at approximately 177 million and Option 2 at approximately 191 million, for a total possible contract value of about $913 million. The contract covers mission operations and data analysis, which includes observatory operations, science data processing and astronomer support. The operations tasks include monitoring the health and status of the observatory and developing and uplinking the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning and coordination of science observations and processing and delivery of the resulting scientific data. NASA's Marshall Space Flight Center in Huntsville, Ala, manages the Chandra program for the agency's Science Mission Directorate in Washington. The Smithsonian Astrophysical Observatory controls Chandra's science and flight operations. For more information about the Chandra X-ray Observatory visit: http://chandra.nasa.gov
Critical Issues: Keys to Successful Contracting
ERIC Educational Resources Information Center
Zopf, Michael
2010-01-01
In today's restrictive school-funding environment, many school districts are evaluating different strategies for providing noninstructional support services to preserve financial resources for the classroom. Among the strategies they are considering on a wide scale is the contracting of support functions, including pupil transportation, custodial…
24 CFR 888.320 - One-time Contract Rent determination.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND... Elderly or Handicapped, and Special Allocations Projects § 888.320 One-time Contract Rent determination...
78 FR 73504 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-06
... Logistics Support Detachment, Undisclosed Location*, Ft. Belvoir, VA. NPA: MVLE, Inc., Springfield, VA. Contracting Activity: Directorate of Contracting Procurement Logistics Support Detachment, Fort Belvoir, VA.... Lineback, Director, Business Operations. [FR Doc. 2013-29139 Filed 12-5-13; 8:45 am] BILLING CODE 6353-01-P ...
Jamil, Amber; Raja, Usman; Darr, Wendy
2013-01-01
This research examined the relationships between perceived psychological contract breach, felt violation, and burnout in a sample (n = 361) of employees from various organizations in Pakistan. The moderating role of contract types in these relationships was also tested. Findings supported a positive association between perceived psychological contract breach and felt violation and both were positively related to burnout. Transactional and relational contracts moderated the felt violation-burnout relationship. Scores on relational contract type tended to be higher than for transactional contract type showing some contextual influence.
AFSOC Training Systems (Briefing Slides)
2010-05-25
ATARS II contract Aircrew Courseware Loadmaster PTT Integrated Cockpit Maintenance Trainer Weapon Systems Trainer Visual Awareness Recognition System...Training Systems Support CLS Aircrew Training and Rehearsal Support ( ATARS ) II contract, 2007 Prime: Lockheed Martin Simulation, Training & Support...Larry Allen, AFSOC/A5RT, (850) 884-5568 ATARS II: 677 AESG/SYCC, Capt Shane Smoot, (937) 255-3391 AFSOC/A3TS, Scott Murphy, (850) 884-5773 MC/AC-130J
Joint Implications for Contracted Logistics
2007-03-30
authority with the host nation country and policy on using UCMJ for contracted personnel. As tailored theater policies are developed and contracting...responsibility, this paper recommends better joint training, leader development and joint enablers for contracting operations. JOINT...U.S. Joint Forces Command (JFCOM) are analyzing Congressional and DOD policy to develop procedures and force structure to support contractor
48 CFR 225.7704-3 - Solicitation provisions and contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... American-Trade Agreements-Balance of Payments Program solicitation provisions and contract clauses... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in Iraq or Afghanistan 225.7704-3 Solicitation provisions and contract...
48 CFR 225.7703-4 - Reporting requirement.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...
48 CFR 225.7703-4 - Reporting requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...
48 CFR 225.7703-4 - Reporting requirement.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...
48 CFR 1852.243-71 - Shared savings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... organizational support of a contract or group of contracts. These alternatives must result in a net reduction of... organizational support which are proposed to be changed. (2) A description of the difference between the current... make any structural or organizational changes in order to implement an approved CRP. (5) Government...
Zaidi, Shehla; Mayhew, Susannah H; Cleland, John; Green, Andrew T
2012-10-01
Contracting non-governmental organizations (NGOs) for health service provision is gaining increasing importance in low- and middle-income countries. However, the role of the wider context in influencing the effectiveness of contracting is not well studied and is of relevance given that contracting has produced mixed results so far. This paper applies a policy analysis approach to examine the influence of policy and political factors on contracting origin, design and implementation. Evidence is drawn from a country case study of Pakistan involving extensive NGO contracting for human immunodeficiency virus (HIV) prevention services supported by international donor agencies. A multilevel study was conducted using 84 in-depth interviews, 22 semi-structured interviews, document review and direct observation to examine the national policy design, provincial management of contracting and local contract implementation. There were three main findings. First, contracting origin and implementation was an inherently political process affected by the wider policy context. Although in Pakistan a combination of situational events successfully managed to introduce extensive and sophisticated contracting, it ran into difficulties during implementation due to ownership and capacity issues within government. Second, wide-scale contracting was mis-matched with the capacity of local NGOs, which resulted in sub-optimal contract implementation challenging the reliance on market simulation through contracting. Third, we found that contracting can have unintended knock-on effects on both providers and purchasers. As a result of public sector contracts, NGOs became more distanced from their grounded attributes. Effects on government purchasers were more unpredictable, with greater identification with contracting in supportive governance contexts and further distancing in unsupportive contexts. A careful approach is needed in government contracting of NGOs, taking into account acceptance of contracting NGOs, local NGO capacities and potential distancing of NGOs from their traditional attributes under contracts. Political factors and knock-on effects are likely to be heightened in the sudden and aggressive use of contracting in unprepared settings.
Let's be professional about this: ideology and the psychological contracts of registered nurses.
O'Donohue, Wayne; Nelson, Lindsay
2007-07-01
This study explores whether there is evidence of an ideological component in the psychological contracts of professional employees, as well as evidence of credible supporting commitments by their employer. Fundamental changes in the employment context have prompted many individuals to seek a closer alignment between themselves and their work, as well as with the organizational and broader societal contexts. For many professional employees identification with their professional ideology is a significant factor in producing such an alignment. The study uses an exploratory qualitative approach to analyse interview data collected from a sample of registered nurses employed in an Australian public hospital. The analysis identifies psychological contract terms best understood by reference to an ideological currency. It also suggests that the organization is perceived as obligated to provide credible support for that professional contribution, and the perceived lack of such support has significant impacts. The findings raise doubts about the utility of the concept of a psychological contract that recognizes only economic and socio-emotional exchanges for understanding the psychological contracts of professional employees.
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2011 CFR
2011-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2012 CFR
2012-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2013 CFR
2013-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2014 CFR
2014-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2010 CFR
2010-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
Proposal Improvements That Work
NASA Technical Reports Server (NTRS)
Dunn, F.
1998-01-01
Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.
Performance-based contracting in home-care work in The Netherlands: professionalism under pressure?
Oomkens, Rosanne; Hoogenboom, Marcel; Knijn, Trudie
2016-07-01
Our aim was to improve the understanding of the relationships between performance-based contracting, management supportiveness and professionalism in home care. Using path analysis, this article explores the relationships between home-care workers' perceptions of management support, implementation of performance-based contracting (i.e. use of strict time registration rules and cost-efficiency measures) and autonomy and intrinsic job satisfaction. We hypothesised that: use of strict time registration rules and cost-efficiency measures relates to lower levels of autonomy and intrinsic job satisfaction (H1); there is an indirect relationship between use of strict time registration rules and use of cost-efficiency measures and intrinsic job satisfaction via autonomy (H2); higher levels of management support relate to the use of looser time registration rules and less use of cost-efficiency measures (H3); and higher levels of management support relate to higher levels of autonomy and intrinsic job satisfaction (H4). We used data from a cross-sectional survey conducted in 2010 of a sample of Dutch home-care workers (N = 156, response rate = 34%). Overall, our study suggests that the consequences of performance-based contracting for professionalism are ambiguous. More specifically, using strict time registration rules is related to lower levels of autonomy, whereas using cost-efficiency measures does not seem to affect autonomy (H1). Performance-based contracting has no consequences for the level of fulfilment home-care workers find in their job, as neither of the two contracting dimensions measured was directly or indirectly related to intrinsic job satisfaction (H1, H2). The role of managers must be taken into account when studying performance-based contracting, because perceived higher management support is related to managers' less frequent use of both strict time registration rules and of cost-efficiency measures (H3). The insight we gained into the importance of supportive managers for both autonomy and job satisfaction (H4) can help home-care organisations improve the attractiveness of home-care work. © 2015 John Wiley & Sons Ltd.
Gupta, Vishal; Agarwal, Upasna A; Khatri, Naresh
2016-11-01
This study examines the factors that mediate and moderate the relationships of perceived organizational support with work engagement and organization citizenship behaviour. Specifically, affective commitment is posited to mediate and psychological contract breach to moderate the above relationships. Nurses play a critical role in delivering exemplary health care. For nurses to perform at their best, they need to experience high engagement, which can be achieved by providing them necessary organizational support and proper working environment. Data were collected via a self-reported survey instrument. A questionnaire was administered to a random sample of 750 nurses in nine large hospitals in India during 2013-2014. Four hundred and seventy-five nurses (63%) responded to the survey. Hierarchical multiple regression was used for statistical analysis of the moderated-mediation model. Affective commitment was found to mediate the positive relationships between perceived organizational support and work outcomes (work engagement, organizational citizenship behaviour). The perception of unfulfilled expectations (psychological contract breach) was found to moderate the perceived organizational support-work outcome relationships adversely. The results of this study indicate that perceived organizational support exerts its influence on work-related outcomes and highlight the importance of taking organizational context, such as perceptions of psychological contract breach, into consideration when making sense of the influence of perceived organizational support on affective commitment, work engagement and citizenship behaviours of nurses. © 2016 John Wiley & Sons Ltd.
48 CFR 15.605 - Content of unsolicited proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 15.605 Content of... and type of organization; e.g., profit, nonprofit, educational, small business; (2) Names and..., including alternates; and (4) Type of support needed from the agency; e.g., Government property or personnel...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... Headquarters NATO Training Mission--Afghanistan (NTM-A) to permit the designation of non-U.S. Government employees as contracting officer's representatives (CORs) in support of the NTM-A's efforts to train the Afghan National Security Force (ANSF). The NTM-A supports the growth of the ANSF through numerous...
Dissipation consistent fabric tensor definition from DEM to continuum for granular media
NASA Astrophysics Data System (ADS)
Li, X. S.; Dafalias, Y. F.
2015-05-01
In elastoplastic soil models aimed at capturing the impact of fabric anisotropy, a necessary ingredient is a measure of anisotropic fabric in the form of an evolving tensor. While it is possible to formulate such a fabric tensor based on indirect phenomenological observations at the continuum level, it is more effective and insightful to have the tensor defined first based on direct particle level microstructural observations and subsequently deduce a corresponding continuum definition. A practical means able to provide such observations, at least in the context of fabric evolution mechanisms, is the discrete element method (DEM). Some DEM defined fabric tensors such as the one based on the statistics of interparticle contact normals have already gained widespread acceptance as a quantitative measure of fabric anisotropy among researchers of granular material behavior. On the other hand, a fabric tensor in continuum elastoplastic modeling has been treated as a tensor-valued internal variable whose evolution must be properly linked to physical dissipation. Accordingly, the adaptation of a DEM fabric tensor definition to a continuum constitutive modeling theory must be thermodynamically consistent in regards to dissipation mechanisms. The present paper addresses this issue in detail, brings up possible pitfalls if such consistency is violated and proposes remedies and guidelines for such adaptation within a recently developed Anisotropic Critical State Theory (ACST) for granular materials.
2016-03-23
cleaned so that they are free of dust, dirt, lint and human waste, and trash.” However, the contract did not explicitly state that the facilities...be free of mold/mildew. ACC–RI and ARCENT should review and modify the basic life support services contract, as necessary, to include measures...Responsibility, “The Sand Book,” July 18, 2014. 16 Unified Facility Criteria 1-202-01, “Host Nation Facilities in Support of Military Operations,” September 1
ERIC Educational Resources Information Center
New York State Education Dept., Albany. Div. of Evaluation.
This paper describes the historical development of performance contracting, discusses the first performance contracting experiment, cites reactions to performance contracting, and supplies supportive data. The contents are designed to assist the New York State Board of Regents to determine policy for the State Education Department and the New York…
The petroleum explorationist's guide to contracts used in oil and gas operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mosburg, L.G. Jr.
This volume provides articles and current sample forms of contract negotiation and drafting. The contents include: An introduction to oil and gas contracts; Effective deal negotiation; General principles of contract law and negotiation; Problems and pitfalls in support agreements; Sample support agreements; Basic concept of farmout agreements; Farmout negotiation checklist; ''Area of mutual interest'' provisions, Problems and pitfalls in 'contract (minimum) depth' and 'farmout (earned) depth' provisions; Options in interests assigned and reserved; Sample 'AMI' provision; ''conventional'' and ''revenue ruling 77-176'' farmout agreement forms; the AAPL model from operating agreement; 1982 revisions to the model form; Side-by-side comparisons of themore » 1956, 1977 and 1982 model forms, 1984 (1985) COPAS accounting procedure; Tax consequences of oil and gas exploration and development, revenue ruling 77-176; Use of tax partnerships and present assignments; Also materials on gas balancing agreements: Seismic options; and Structuring considerations.« less
2015-12-01
organizational structure of Army contracting and the changes to that organization under the MICC 2025 plan. We then describe the organizations where we... organizational change . Portal: Libraries and the Academy, 4(3), 345–361. McFall, T. (2015). 918th CBN/MICC-FC organizational overview [PowerPoint slides...Installation Contracting Command (MICC) are undergoing a significant change in structure known as MICC 2025. In order to gauge the effectiveness of this
48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA solicitation provision...-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer shall...-site support services where emergency evacuations of the NASA installation may occur, e.g., snow...
48 CFR 50.206 - Solicitation provisions and contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (3) Use the provision at 52.250-3 with its Alternate II when offers presuming SAFETY Act designation... Alternate II; and (2) In any resultant contract, if DHS has not issued SAFETY Act designation or... REGULATION CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Support Anti-terrorism by...
48 CFR 50.206 - Solicitation provisions and contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (3) Use the provision at 52.250-3 with its Alternate II when offers presuming SAFETY Act designation... Alternate II; and (2) In any resultant contract, if DHS has not issued SAFETY Act designation or... REGULATION CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Support Anti-terrorism by...
Contracting by Competitive Negotiations in Support of FMS
1993-01-01
34over-regulated," in the view of two recognized authorities in federal government contract law .5 In balance, however, another respected authority who...America’s military hardware is sought by almost every nation.Ś In 1993, I requested a leading authority on Government procurement contract law , John
Code of Federal Regulations, 2014 CFR
2014-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
Code of Federal Regulations, 2012 CFR
2012-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
Code of Federal Regulations, 2013 CFR
2013-10-01
... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...
ERIC Educational Resources Information Center
Mass Insight Education (NJ1), 2011
2011-01-01
Organized by the key conditions areas for turnaround, "People, Program, Time and Money," this tool offers sample language for each contract element to serve as a model for modifications from a traditional CBA that may support a district's turnaround efforts. Sample language is offered from existing provisions in district-wide collective bargaining…
NASA Glenn Research Center Support of the ASRG Project
NASA Technical Reports Server (NTRS)
Wilson, Scott D.; Wong, Wayne A.
2014-01-01
A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.
Program and Management Support for the Office of Military Performance Assessment Technology
1992-04-03
AD-A267 285 CONTRACT NO: DAMD17-90-C-0061 TITLE: PROGRAM AND MANAGEMENT SUPPORT FOR THE OFFICE OF MILITARY PERFORMANCE ASSESSMENT TECHNOLOGY...1204. Arlington, VA 22202-4302. and to the Office of Management and Budget. Paperwork Reduction Projet (0704-0188). Washington, DC 20503 1. AGENCY USE...NUMBERS Program and Management Support for the Office of Contract No. Military Performance Assessment Technology DAMDI7-90-C-0061 6. AUTHOR(S) Marvin
2016-05-01
Award Number: PT075653 (grant) W81XWH-08-2-0153 (contract) TITLE: Treatment of TBI with Hormonal and Pharmacological Support, Preclinical...TITLE AND SUBTITLE 5a. CONTRACT NUMBER W81XWH-08-2-0153 Treatment of TBI with Hormonal and Pharmacological Support, Preclinical Validation Using...rats. Our in vivo tests also included MRI imaging, focusing on edema resolution and reduction of diffuse axonal damage (fractional anisotropy
NASA Technical Reports Server (NTRS)
Billingsley, Charles E.; Frederick, Larry
1993-01-01
The contract baseline, contract requirements review, contract modifications, contract problem areas and conclusions are addressed. Contract baseline was established 11 June 1987 and updated 1 December 1989. Significant changes were introduced into the 1989 baseline as compared to the original baseline. Contract modifications were made to add requirements as the program matured and as definition of requirements were completed. Problems were solved in real time through the contractor/customer team involvement and relationship to assure a timely and successful mission. The conclusion is that the CGF performed as designed and the experiments performed during the USML-1 Mission supports the conclusion.
Code of Federal Regulations, 2010 CFR
2010-10-01
... is HHS policy that contracting activities shall not award a contract involving live vertebrate.../PHS-supported or HHS/PHS-conducted activities involving the care and use of live vertebrate animals...
48 CFR 15.407-1 - Defective certified cost or pricing data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contracting officer shall immediately bring the matter to the attention of the prospective contractor, whether... bring the character of the data to the attention of the contracting officer; (iii) The contract was... change order). (5) An offset shall be allowed only in an amount supported by the facts and if the...
13 CFR 126.607 - When must a contracting officer set aside a requirement for qualified HUBZone SBCs?
Code of Federal Regulations, 2012 CFR
2012-01-01
... fair market prices. This requirement does not preclude a contracting officer from setting aside a... will be made at fair market prices. However, after conducting market research, the contracting officer... to support the specific set-aside, including the type and extent of market research conducted. In...
Contingency Contracting and Operant Behavior Change: An Exercise in Applied Behavior Analysis.
ERIC Educational Resources Information Center
Mann, Ronald A.
Until recently, the use of contingency contracting has been largely an issue of theory and discussion with little experimental research evidence gathered to support efficacy. Two major reasons for this problem are suggested and discussed: (1) the concept of contingency contracting has not been adequately defined nor its minimal requirements…
[Operation/Maintenance of Fiber Placement Machine
NASA Technical Reports Server (NTRS)
Pelham, L.; Dillard, T.
2000-01-01
NASA contract NAS8-39749 was completed in January 2000. The contract period of performance covered six (6) years and included basic program technical support as required by NASA with up to thirty (30) different technical directives identified and issued by NASA for specific Advanced Composite Technology tasks during the course of the contract.
ERIC Educational Resources Information Center
Copeland, D. R.; And Others
The report provides a description of the Phase II findings of a two-phase study to determine if certain Marine Corps skill training requirements could be satisfied through contract with qualified commercial sources. It demonstrates the utility of the commercial contract training concept and contains information useful to Area VOTEC…
Social contract and social integration in adolescent development.
Hilles, W S; Kahle, L R
1985-10-01
Eighty-nine subjects from two high schools were tested during the spring of their sophomore and senior years, when their mean ages were 16 years, 1 month, and 18 years, 1 month, respectively. Composites measured social contract with: (a) independence, (b) implicit social contract, societal norms and expectations, and (c) explicit social contracts, rules. Composites and single items measured social integration with: (d) role commitment, (e) social-American Dream, accepting the belief in the American Dream that hard work would lead to social success, (f) self-American Dream, belief that hard work will produce personal satisfaction and success, (g) raw deal, perceptions of being treated unfairly, (h) self-blame, and (i) feelings of hopelessness. The results of the cross-lagged panel correlations generally support the hypothesis that students respond to implicit social contracts through role commitment, which is further expressed by a belief in the American Dream for social fulfillment, while responding to the perception of explicit social contracts by not believing in the benefits of the American Dream for personal fulfillment. These results were interpreted as supporting Dienstbier's theory of moral development.
Psychological contracts of hospice nurses.
Jones, Audrey Elizabeth; Sambrook, Sally
2010-12-01
Psychological contracts have been described as individuals' beliefs regarding the obligations, expectations, and contributions that exist between them and their employer. They can be influenced by the organization's culture and philosophy, through human resources policies, and through the employee's personality and characteristics. Owing to the recent economic crisis, hospices in the UK are currently in a transitional phase and are being expected to demonstrate efficiencies that might be more in line with a business model than a health-care environment. This may conflict with the philosophical views of hospice nurses. To support nurses through this transition, it might be helpful to understand the antecedents of hospice nurses' behaviour and how they construct their psychological contracts. Failure to offer adequate support might lead to negative outcomes such as a desire to leave the organisation, poorer quality work, or disruptive behaviour. This study used a modified grounded theory approach involving in-depth interviews to explore the context and content of the psychological contracts of hospice nurses in the UK. Four main themes emerged: the types of psychological contracts formed, how the contracts are formed, their contents, and the breaches and potential violations the nurses perceive.
77 FR 143 - New Postal Product
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
... information under seal. In the Statement of Supporting Justification, Dennis R. Nicoski, Manager, Field Sales Strategy and Contracts, asserts that the contract will cover its attributable costs, make a positive...
77 FR 69598 - Procurement List Proposed Addition
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-20
... Support, Directorate of Public Works, Fort Lee, Virginia. NPA: Skookum Educational Programs, Bremerton, WA Contracting Activity: Mission and Installation Contracting Command-- Fort Lee, Fort Lee, VA Barry S. Lineback...
Recruitment of Physicians for the Active Army, 1975-1980
1975-06-06
its supporting assets includinF the personnel counselor system and contract advertising capabilities: and, (4) comparison of physician pro curement...any criti- cism directed toward recruitment efforts has inhibited the use of available assets to include common corvmercial advertising techniques. 1 4...current Army procurement system and its supporting assets including the personnel counselor system ana contract advertising capabil- ities; and, (4
Analysis of Contemporary Contingency Contracting Educational Resources
2010-12-01
Afghanistan by providing base operations support (e.g., food and housing); communication services; tactical and nontactical vehicle maintenance...Contingency Contracting Handbook on which it is based) and CON 334, mentioned earlier, are widely accessible to all acquisition communities across the DoD...missions, and humanitarian relief efforts. The services provided include base operations support (e.g., food and housing), communication services
2009-12-01
interviews with separating employees to obtain this information (Mathis & Jackson, 2003, pp. 90-91). Management should also measure the ‘internal churn rate...Sullivan, 2009). This is a measure of internal transfers from one department to others. High internal churn rates in particular areas may...contracting support and service throughout the National Capital Region” (CCE, 2009). Among other things, CCE provides telecommunication equipment and
Defense Contracting in Iraq: Issues and Options for Congress
2008-05-06
ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public...contract calls for the three companies to compete for task orders; each company may be awarded up to $5 billion for troop support services per year , the...contracting. The Fiscal Year (FY) 2008 Defense Authorization Act (P.L. 110-181) contains provisions that address contract waste, fraud, abuse, and
1992-09-01
suggest that certain regulations should be considered for changes or waivers that go into effect during military contingencies. Also, there are...within the DOD to contractually support ODS has the potential to aid in educating contracting professionals to effectively and efficiently support a...operations to free Kuwait by enacting sanctions against Iraq. Only when it 10 became apparent that the sanctions were having no effect were military
Superfund Contract Laboratory Program
The Contract Laboratory Program (CLP) is a national network of EPA personnel, commercial laboratories, and support contractors whose primary mission is to provide data of known and documented quality to the Superfund program.
48 CFR 23.704 - Application to Government-owned or -leased facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Contracting for Environmentally Preferable Products... and contracts for support services at a Government-owned or -operated facility include provisions that...
48 CFR 213.306 - SF 44, Purchase Order-Invoice-Voucher.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION...) Transactions in support of intelligence and other specialized activities addressed by Part 2.7 of Executive...
Contracting Deployment Customer Guide.
1996-12-01
functional managers from the major commands expressed the need to develop a Customer Guide for contingency deployments which would standardize, simplify, and...streamline the support our Contingency Contracting Officers (CCOs) provide to our customers .
[The state of the psychological contract and its relation with employees' psychological health].
Gracia, Francisco Javier; Silla, Inmaculada; Peiró, José María; Fortes-Ferreira, Lina
2006-05-01
In the present paper the role of the state of the psychological contract to predict psychological health results is studied in a sample of 385 employees of different Spanish companies. Results indicate that the state of the psychological contract significantly predicts life satisfaction, work-family conflict and well-being beyond the prediction produced by the content of the psychological contract. In addition, trust and fairness, two dimensions of the state of psychological contract, all together contribute to explain these psychological health variables adding value to the role as predictor of fulfillment of the psychological contract. The results support the approach argued by Guest and colleagues.
Choice of contracts in the British National Health Service: an empirical study.
Chalkley, Martin; McVicar, Duncan
2008-09-01
Following major reforms of the British National Health Service (NHS) in 1990, the roles of purchasing and providing health services were separated, with the relationship between purchasers and providers governed by contracts. Using a mixed multinomial logit analysis, we show how this policy shift led to a selection of contracts that is consistent with the predictions of a simple model, based on contract theory, in which the characteristics of the health services being purchased and of the contracting parties influence the choice of contract form. The paper thus provides evidence in support of the practical relevance of theory in understanding health care market reform.
GPHS-RTGs in support of the Cassini RTG Program
NASA Astrophysics Data System (ADS)
1995-04-01
The technical progress achieved during the period 26 Sep. 1994 - 2 Apr. 1995 on Contract DE-AC03-91SF-18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described herein. Monthly technical activity for the period 27 Feb. - 2 Apr. 1995 is included in this progress report. The report addresses tasks, including: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and CAGO acquisition (capital funds).
ERIC Educational Resources Information Center
Inbar, David
Purchasing contributes significantly to an organization and to its business strategy only if its activities and contracts with suppliers are guided by support criteria for the final products that the organization sells. Outlined in this paper are four innovative purchasing strategies: capitation contracts; product life cycle cost contracts;…
ERIC Educational Resources Information Center
Carpenter, Polly; And Others
The Texarkana model of performance contracting consists of five major elements: (1) turnkeying of cost-effective new technology as a basic program goal, (2) use of a performance contract for instruction, (3) use of a management support contractor, (4) selection of the learning system contractor by formal competition, and (5) use of independent…
Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1995-09-01
This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.
Bioanalytical outsourcing strategy at Janssen Research and Development.
Verhaeghe, Tom
2014-05-01
The times when all bioanalytical work was supported in-house are long behind us. In the modern bioanalytical laboratory, workload is divided between in-house support and outsourcing to contract research organizations. This paper outlines the outsourcing strategy of the Janssen-regulated bioanalytical group. Keeping the knowledge of the assay and the compound internally is a cornerstone of this strategy and is a driver for balancing the workload between the internal laboratory and contract laboratories. The number of contract laboratories that are being used is limited and criteria for selecting laboratories are discussed. Special attention is paid to the experience with outsourcing clinical studies to China.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taffet, Michael J.; Esser, Bradley K.; Madrid, Victor M.
This report summarizes work performed by Lawrence Livermore National Laboratory (LLNL) under Navajo Nation Services Contract CO9729 in support of the Navajo Abandoned Mine Lands Reclamation Program (NAMLRP). Due to restrictions on access to uranium mine waste sites at Tse Tah, Arizona that developed during the term of the contract, not all of the work scope could be performed. LLNL was able to interpret environmental monitoring data provided by NAMLRP. Summaries of these data evaluation activities are provided in this report. Additionally, during the contract period, LLNL provided technical guidance, instructional meetings, and review of relevant work performed by NAMLRPmore » and its contractors that was not contained in the contract work scope.« less
Carbon Dioxide Removal and the futures market
NASA Astrophysics Data System (ADS)
Lockley, A.; Coffman, D.
2016-12-01
Futures contracts are exchange-traded financial instruments that enable parties to fix a price in advance, for performance on a contract at some later date. Forward contracts also entail future settlement, but they are traded over-the-counter between two independent parties. Both futures and forward contracts are commonly used in commodities trading, as producers seek financial security when planning production. We discuss the use of potential use of exchange-traded futures contracts in Carbon Dioxide Removal (CDR) markets. We conclude that they have one principal advantage (in that they give near-term price security to current polluters), and one principal disadvantage (in that a combination of high price volatility and high trade volume means contracts issued by the private sector may cause systemic economic risk). Accordingly, we note the potential for the development of futures markets in CDR, but urge great caution in the use of this approach. In particular, we consider the use of regulated markets: to ensure contracts are more reliable, and that moral hazard is minimised. Whilst regulation offers generally increased assurances, we identify major insufficiencies with this approach - finding it generally inadequate. In conclusion, we suggest that only governments can realistically support long-term CDR futures markets. We note existing long-term CDR plans by governments, and suggest the use of state-backed futures for supporting these assurances.
Legal Services: Judge Advocate Legal Services
1996-09-30
14–14, page 41 Publicity • 14–15, page 41 Insignia • 14–16, page 41 Chapter 15 Contract Law Attorneys, page 43 General • 15–1, page 43 General...Duties • 15–2, page 43 Management • 15–3, page 43 Principles of contract law practice • 15–4, page 43 Contract disputes and litigation support • 15–5...legal matters; and (2) Resolving their personal legal problems whenever possible. m. Contract law responsibilities. TJAG will provide— (1) Technical
DOT National Transportation Integrated Search
2013-02-27
SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...
Alcohol ignition interlock service support
DOT National Transportation Integrated Search
1992-12-01
Author's abstract: This Technical Report was produced under Contract No. DTNH22-89-C-07009 for the National Highway Traffic Safety Administration. Under that same contract, a draft set of model specifications for Breath Alcohol Ignition Interlock Dev...
Contracting With the Enemy: The Contracting Officer’s Dilemma
2015-06-01
forgery, bribery , etc. Intentionally misusing "Made in America" designation Other offenses indicating a lack of business integrity or honesty that...major risk associated with using local national contractors in contingency environments is the presence of business entities that may directly or...indirectly support adversarial forces. Entering into contracts with enemy-affiliated business entities creates significant contractual and security
ERIC Educational Resources Information Center
Copeland, D. Robert; And Others
The two-part report describing the Phase 2 findings of a two-phase study demonstrates the utility of the commercial contract training concept for satisfying certain Navy skill training requirements. Part 1 concerns source evaluation, skill analysis and selection, contractual considerations, and comparative training capability evaluation. It…
Contingency Contracting Customer Guide
1996-12-01
I CONTINGENCY CONTRACTING CUSTOMER GUIDE PROJECT NUMBER: LC9619100 PROJECT MANAGER: CAPT TOM SNYDER TEAM MEMBERS MAJ JOHN PERRY CAPT ROBBIN VAUGHN...Report 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Contracting Deployment Customer Guide 6. AUTHOR(S) Capt.Thomas J. Snyder, AFLMA/LGC, DSN 596-4085 7...individual customers on the process, the customer support guide provides the necessary explanations without straining valuable manpower resources. The
Carbon dioxide removal and the futures market
NASA Astrophysics Data System (ADS)
Coffman, D.'Maris; Lockley, Andrew
2017-01-01
Futures contracts are exchange-traded financial instruments that enable parties to fix a price in advance, for later performance on a contract. Forward contracts also entail future settlement, but they are traded directly between two parties. Futures and forwards are used in commodities trading, as producers seek financial security when planning production. We discuss the potential use of futures contracts in Carbon Dioxide Removal (CDR) markets; concluding that they have one principal advantage (near-term price security to current polluters), and one principal disadvantage (a combination of high price volatility and high trade volume means contracts issued by the private sector may cause systemic economic risk). Accordingly, we note the potential for the development of futures markets in CDR, but urge caution about the prospects for market failure. In particular, we consider the use of regulated markets: to ensure contracts are more reliable, and that moral hazard is minimised. While regulation offers increased assurances, we identify major insufficiencies with this approach—finding it generally inadequate. In conclusion, we suggest that only governments can realistically support long-term CDR futures markets. We note existing long-term CDR plans by governments, and suggest the use of state-backed futures for supporting these assurances.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.
Peng, Yun; Miller, Brandi D; Boone, Timothy B; Zhang, Yingchun
2018-02-12
Weakened pelvic floor support is believed to be the main cause of various pelvic floor disorders. Modern theories of pelvic floor support stress on the structural and functional integrity of multiple structures and their interplay to maintain normal pelvic floor functions. Connective tissues provide passive pelvic floor support while pelvic floor muscles provide active support through voluntary contraction. Advanced modern medical technologies allow us to comprehensively and thoroughly evaluate the interaction of supporting structures and assess both active and passive support functions. The pathophysiology of various pelvic floor disorders associated with pelvic floor weakness is now under scrutiny from the combination of (1) morphological, (2) dynamic (through computational modeling), and (3) neurophysiological perspectives. This topical review aims to update newly emerged studies assessing pelvic floor support function among these three categories. A literature search was performed with emphasis on (1) medical imaging studies that assess pelvic floor muscle architecture, (2) subject-specific computational modeling studies that address new topics such as modeling muscle contractions, and (3) pelvic floor neurophysiology studies that report novel devices or findings such as high-density surface electromyography techniques. We found that recent computational modeling studies are featured with more realistic soft tissue constitutive models (e.g., active muscle contraction) as well as an increasing interest in simulating surgical interventions (e.g., artificial sphincter). Diffusion tensor imaging provides a useful non-invasive tool to characterize pelvic floor muscles at the microstructural level, which can be potentially used to improve the accuracy of the simulation of muscle contraction. Studies using high-density surface electromyography anal and vaginal probes on large patient cohorts have been recently reported. Influences of vaginal delivery on the distribution of innervation zones of pelvic floor muscles are clarified, providing useful guidance for a better protection of women during delivery. We are now in a period of transition to advanced diagnostic and predictive pelvic floor medicine. Our findings highlight the application of diffusion tensor imaging, computational models with consideration of active pelvic floor muscle contraction, high-density surface electromyography, and their potential integration, as tools to push the boundary of our knowledge in pelvic floor support and better shape current clinical practice.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Psychological contracts and commitment amongst nurses and nurse managers: a discourse analysis.
McCabe, T J; Sambrook, Sally
2013-07-01
Few studies explore the link between the psychological contracts and the commitment of nursing professionals in the healthcare sector, and how perceived breaches of the psychological contract can impact on nurses' commitment levels. This study explores the connections between the psychological contracts and organisational and professional commitment of nurses and nurse managers. Semi-structured interviews were conducted with nurses and nurse managers, to explore the connections between their psychological contracts and organisational and professional commitment. Large acute and small community organisation within the British National Health Service. 28 nurses and 11 nurse managers working within an acute and a community sector organisation - 20 and 19 in each organisation. Participants were selected through a process of purposive sampling, reflecting variations in terms of age, grade, ward and tenure. A discourse analysis was conducted on the qualitative data from the thirty nine semi-structured interviews. Two overall themes emerged, professional and managerial values. Professional values included the sub-themes: professional recognition; immediate work environment - leadership and peer support; professional development and progression. Sub-themes under managerial values included: involvement; general management; resource management. The findings suggest that nurses and nurse managers are governed by relational psychological contracts, underpinned by an affective and to a lesser extent normative commitment towards the nursing profession. They emphasise 'professional values', and professional commitment, as the basis for positive psychological contracts amongst nursing professionals. There was anecdotal evidence of relational psychological contract breach, with decreasing job satisfaction as the outcome of perceived psychological contract breach. Positive psychological contracts and commitment levels amongst nursing professionals can be supported by managers been aware and sensitive to nursing discourses, and managing their expectations through greater involvement and leadership development. Copyright © 2012 Elsevier Ltd. All rights reserved.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Services of Students at Research and... intermittent services of students at institutions of higher learning for the purpose of providing technical support at Defense research and development laboratories (10 U.S.C. 2360). ...
48 CFR 1631.205-10 - Cost of money.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...
48 CFR 1631.205-10 - Cost of money.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...
Design of inventory pools in spare part support operation systems
NASA Astrophysics Data System (ADS)
Mo, Daniel Y.; Tseng, Mitchell M.; Cheung, Raymond K.
2014-06-01
The objective of a spare part support operation is to fulfill the part request order with different service contracts in the agreed response time. With this objective to achieve different service targets for multiple service contracts and the considerations of inventory investment, it is not only important to determine the inventory policy but also to design the structure of inventory pools and the order fulfilment strategies. In this research, we focused on two types of inventory pools: multiple inventory pool (MIP) and consolidated inventory pool (CIP). The idea of MIP is to maintain separated inventory pools based on the types of service contract, while CIP solely maintains a single inventory pool regardless of service contract. Our research aims to design the inventory pool analytically and propose reserve strategies to manage the order fulfilment risks in CIP. Mathematical models and simulation experiments would be applied for analysis and evaluation.
40 CFR 35.6250 - Support agency Cooperative Agreement requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6250 Support agency...
40 CFR 35.6250 - Support agency Cooperative Agreement requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6250 Support agency...
40 CFR 35.6250 - Support agency Cooperative Agreement requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6250 Support agency...
40 CFR 35.6250 - Support agency Cooperative Agreement requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6250 Support agency...
Supporting Cross-Organizational Process Control
NASA Astrophysics Data System (ADS)
Angelov, Samuil; Vonk, Jochem; Vidyasankar, Krishnamurthy; Grefen, Paul
E-contracts express the rights and obligations of parties through a formal, digital representation of the contract provisions. In process intensive relationships, e-contracts contain business processes that a party promises to perform for the counter party, optionally allowing monitoring of the execution of the promised processes. In this paper, we describe an approach in which the counter party is allowed to control the process execution. This approach will lead to more flexible and efficient business relations which are essential in the context of modern, highly dynamic and complex collaborations among companies. We present a specification of the process controls available to the consumer and their support in the private process specification of the provider.
ERIC Educational Resources Information Center
Copeland, D. Robert; And Others
The two-part report describing the Phase 2 findings of a two-phase study demonstrates the utility of the commercial contract training concept for satisfying certain Marine Corps skill training requirements. Part 1 concerns source evaluation, skill analysis and selection, contractual considerations, and comparative training capability evaluation.…
Risk Management and Performance in the Balkans Support Contract
2005-01-01
Defense contracts-United States-Case studies . 2. United States. Army- Procurement-Case studies . 3. Bosnia and Hercegovina-History, Military-20ts...24 3.1. Assessment of GAO Cost Study .................................. 72 3.2. Comparison of Potential Sources of Nonperformance...accepting inappropriate risks, what can it do about it? Case studies of CSS contracts can provide some answers. In this report, we present a case study of
78 FR 23543 - Procurement List Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
... Logistics Agency Troop Support, Philadelphia, PA NSN: 1680-00-677-2060--Bottom Assembly, Crew Berth NPA: None assigned. Contracting Activity: Defense Logistics Agency Aviation, Richmond, VA Service Service... Area Rehabilitation Centers, Inc., Madison, WI Contracting Activity: GSA, Public Buildings Service...
Schwarze, Margaret L.; Redmann, Andrew J.; Alexander, G. Caleb; Brasel, Karen J.
2013-01-01
Objective Evidence suggests that surgeons implicitly negotiate with their patients preoperatively about the use of life supporting treatments postoperatively as a condition for performing surgery. We sought to examine whether this surgical buy-in behavior is present among a large, nationally representative sample of surgeons who routinely perform high risk operations. Design Using findings from a qualitative study, we designed a survey to determine the prevalence of surgical buy-in and its consequences. Respondents were asked to consider their response to a patient at moderate risk for prolonged mechanical ventilation or dialysis who has a preoperative request to limit postoperative life supporting treatment. We used bivariate and multivariate analysis to identify surgeon characteristics associated with a) preoperatively creating an informal contract with the patient defining agreed upon limitations of postoperative life support and b) declining to operate on such patients. Setting and subjects US-mail based survey of 2100 cardiothoracic, vascular and neurosurgeons. Interventions None. Measurements and Main Results The adjusted response rate was 56%. Nearly two-thirds of respondents (62%) reported they would create an informal contract with the patient describing agreed upon limitations of aggressive therapy and a similar number (60%) endorsed sometimes or always refusing to operate on a patient with preferences to limit life support. After adjusting for potentially confounding covariates, the odds of preoperatively contracting about life supporting therapy were more than twofold greater among surgeons who felt it was acceptable to withdraw life support on postoperative day 14 as compared to those who felt it was not acceptable to withdraw life support on postoperative day 14 (odds ratio 2.1, 95% confidence intervals 1.3-3.2). Conclusions Many surgeons will report contracting informally with patients preoperatively about the use of postoperative life support. Recognition of this process and its limitations may help to inform postoperative decision making. PMID:23222269
Managed care contracting: a systematic approach.
Flores, K
1987-12-01
Managed care is sweeping the health care industry and has produced some special challenges for providers. Success in contracting depends on preparation. In this article, the author defines managed care and outlines who should be involved in the contracting for these services. Special attention is given to how to develop the appropriate internal support. The author contends that a provider should not embrace all contracting offers and suggests criteria for selection of the best offers. Finally, the prevailing pricing schemes are reviewed and caveats given on their interpretation and use.
NASA Astrophysics Data System (ADS)
The technical progress achieved during the period 11 January through 31 March 1991 on Contract DE-AC03-91SF18852.000 Radioisotope Thermoelectric Generators and ancillary activities is described. The system contract consists of the following tasks: (1) Spacecraft Integration and Liaison; (2) Engineering Support; (3) Safety; (4) Qualify Unicouple Fabrication; (5) ETG Fabrication, Assembly and Test; (6) GSE; (7) RTG Shipping and Launch Support; (8) Designs, Reviews, and Mission Applications; (9) Project Management, Quality Assurance and Reliability; and (10) CAGO Acquisition (Capital Funds). The progress achieved is broken down into these tasks.
Global payment contract attitudes and comprehension among internal medicine physicians.
Allen-Dicker, Joshua; Herzig, Shoshana J; Kerbel, Russell
2015-08-01
Global payment contracts (GPCs) are increasingly common agreements between insurance payers and healthcare providers that incorporate aspects of risk adjustment, capitation, and pay-for-performance. Physicians are often viewed as potential barriers to implementation of organizational change, but little is known about internist opinion on GPC involvement or specific internist attributes that might predict GPC support. We aimed to investigate internist and internal medicine subspecialist support of GPC involvement, and to identify associations among physician attributes, GPC knowledge, and GPC support. Cross-sectional. General medicine and internal medicine subspecialist physicians within the Beth Israel Deaconess Department of Medicine in Boston, Massachusetts, were surveyed 4 years after care organization entry into a GPC. Measurements collected included reported support for GPC involvement, reason for support, and demonstrated comprehension of key GPC details. Of the 281 respondents (49% response rate), 85% reported supporting involvement in a GPC. In a multivariate ordinal logistic regression model, exposure to prior information about GPCs, demonstrated comprehension of key GPC details, longer time since completion of residency, and lower clinical time commitment were all independently associated with higher levels of GPC involvement support. Four years since first engaging in a global payment contract, a majority of internal medicine physician respondents support this decision. Understanding predictors of physician support for GPC involvement within our care organization may help other health systems to approach organizational change. Health system leaders debating GPC involvement should consider engaging physicians via educational interventions geared toward improving GPC support.
48 CFR 44.202-1 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 44.202-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... notification and supporting data to ensure that the proposed subcontract is appropriate for the risks involved... during negotiations, the contracting officer shall identify those subcontracts in paragraph (j) of the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... BUSINESS PROGRAMS Contracting Opportunities for Women-Owned Small Businesses 1419.901 Policy. In support of the Department's policy to facilitate, preserve, and strengthen women's business enterprises: (a) Annual goals for contract awards to women-owned businesses shall be established as prescribed in 1419.201...
47 CFR 54.604 - Existing contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) UNIVERSAL SERVICE Universal Service Support for Health Care Providers § 54.604 Existing contracts. (a) Existing... health care provider as defined under § 54.601 and a telecommunications carrier shall be exempt from the...
48 CFR 315.305 - Proposal evaluation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...
48 CFR 315.305 - Proposal evaluation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...
48 CFR 315.305 - Proposal evaluation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...
48 CFR 23.705 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception applies...
75 FR 53002 - New Postal Products
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
... contracts are functionally equivalent to previously submitted GEPS contracts, and are supported by Governors... authorized functionally equivalent agreements to be included within the product, provided that they meet the... Functionally Equivalent Global Expedited Package Services 3 Negotiated Service Agreements and Application for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Disaster or Emergency Assistance Activities 26.201 Definitions. Emergency response contract means a contract with private entities that supports assistance activities in a... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 26.201...
48 CFR 45.501 - Prime contractor alternate locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...
EPA buys many supplies and services to support the agency's mission. Here you'll find out about contracting with the EPA, including: our policies; what we're looking to buy right now; what we've bought recently, and what we're looking to buy in the future.
Towards a Theory for Combining Information From Related Experiments
2002-11-11
TITLE AND SUBTITLE Final Report on ARO Contract # DAAD 19-99-1- 1082 entitled “Towards a theory for combining information from related...Contract # DAAD 19-99-1- 1082 4. AUTHOR OF THE REPORT: Francisco J. Samaniego, Principal Investigator 5. PERFPORMING ORGANIZATION: University of...preparation under the support of ARO Contract # DAAD 19-99-1- 1082 [1] "Linear Data Fusion", Proceedings of the Fourth Army Conference on Applied
A Collection of JPME Operational Contract Support Case Studies and Vignettes
2016-12-01
Contracting for goods and services in the contingency operational environment is a mission-enabling necessity; however, analyzing the strategic effects...choosing to contract for goods or services are largely ignored. This project explores the use of OCS in contingency environments, and the positive and...think of the costs literally, as tax dollars spent to enhance mission effectiveness. However, the less literal costs and the associated effects of
12th Annual Small Business Conference
2008-11-13
Joint Combat support systems. CoL myers graduated from marshall University in huntington, west virginia with a bachelors degree in Communications. he...as director and Principal assistant responsible for Contracting (ParC) for the Us army Contracting Command’s rock island Contracting Center (riCC...sustainment Command (asC) and the Joint munitions & Lethality Life Cycle management Command (Jm&L-LCmC) – rock island . in this position, he advises
Valuation of Endowment-Insurance Equity-Linked Contracts for Stocks with Exotic Dynamics
2014-01-01
We consider the fair martingale prize of insurance contracts with benefit received either at the insurer's demise or at maturity. We show how to modify the dynamics of the underlying so as to incorporate the possibility that the traded stock has a strong support at some level. The resulting dynamics is integrated and the fair prize of several natural endowment-insurance contracts is obtained. PMID:24672305
2013-02-25
Directive 5160.41E, Defense Language Program . 10GAO-11-456. Page 5 GAO-13-251R Defense Contracting types of foreign language support that DOD has acquired...Language Transformation Roadmap, (January 2005), and Department of Defense Directive 5160.41E, Defense Language Program . Page 15 GAO-13-251R Defense...examines the use of public funds; evaluates federal programs and policies; and provides analyses, recommendations, and other assistance to help
GPHS-RTG's in support of the Cassini mission
NASA Astrophysics Data System (ADS)
1993-10-01
The following tasks were reported: Spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication/assembly/test; ground support equipment; RTG shipping and launch support; designs/reviews/mission applications; and project management/quality assurance/contract changes.
Work management plan for data systems and analysis directorate
NASA Technical Reports Server (NTRS)
Nichols, L. R.
1979-01-01
A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.
Feasibility study and verified design concept for new improved hot gas facility
NASA Technical Reports Server (NTRS)
1986-01-01
The MSFC Hot Gas Facility (HGF) was fabricated in 1975 as a temporary facility to provide immediate turnaround testing to support the SRB and ET TPS development. This facility proved to be very useful and was used to make more than 1300 runs, far more than ever intended in the original design. Therefore, it was in need of constant repair and needed to be replaced with a new improved design to support the continuing SRB/ET TPS product improvement and/or removal efforts. MSFC contracted with Lockheed-Huntsville to work on this improved design through contract NAS8-36304 Feasibility Study and Verified Design Concept for the New Improved Hot Gas Facility. The results of Lockheed-Huntsville's efforts under this contract are summarized.
48 CFR 217.171 - Multiyear contracts for services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agency may enter into multiyear contracts for supplies and services required for management, maintenance..., maintenance, and support of facilities and installations. (ii) Maintenance or modification of aircraft, ships... services (e.g., ground maintenance, in-plane refueling, bus transportation, and refuse collection and...
48 CFR 23.705 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...
48 CFR 23.705 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...
48 CFR 23.705 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract clauses. 23.705 Section 23.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...
48 CFR 23.706 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 23.706 Section 23.706 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC... for support services at Government-owned or -operated facilities. (b)(1) Unless an exception has been...
2 CFR 215.41 - Recipient responsibilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement Standards § 215.41... contractual responsibilities arising under its contract(s). The recipient is the responsible authority... contractual and administrative issues arising out of procurements entered into in support of an award or other...
77 FR 58422 - New Postal Product
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Product AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request to add Priority Mail Contract 43 to the competitive product list... request and associated supporting information to add Priority Mail Contract 43 to the competitive product...
77 FR 58421 - New Postal Product
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Product AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request to add Priority Mail Contract 42 to the competitive product list... request and associated supporting information to add Priority Mail Contract 42 to the competitive product...
48 CFR 237.7601 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, including ships owned, leased, or operated in support of military missions or roles at sea; associated support activities, including installation, garrison, and base support services...
1978-02-10
Contract Number N00014-77-C-0016 Enclosure (1) to CNO LTR Ser 96/S590196 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF ...The changes in numbers of military and commercial contract personnel were obtained by subtracting (3) from (1) and (4) from...Commercial Contract maiming F = Full Capability P = Partial Capability L = Lost Capability . -- ’■ -. • NOTE: Subscripts denote the number of
Defense Contracting in Iraq: Issues and Options for Congress
2008-05-21
ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public...contract calls for the three companies to compete for task orders; each company may be awarded up to $5 billion for troop support services per year , the...examine several bills to ensure proper accountability and oversight in federal contracting. The Fiscal Year (FY) 2008 Defense Authorization Act (P.L
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Policies. 632.803 Section... CONTRACT FINANCING Assignment of Claims 632.803 Policies. (b) The assignment of claims shall be prohibited... Directors, Regional Procurement Support Offices may approve the assignment of claims for contracts under...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Policies. 632.803 Section... CONTRACT FINANCING Assignment of Claims 632.803 Policies. (b) The assignment of claims shall be prohibited... Directors, Regional Procurement Support Offices may approve the assignment of claims for contracts under...
48 CFR 6.303-1 - Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... accurate and complete necessary data to support their recommendation for other than full and open... COMPETITION REQUIREMENTS Other Than Full and Open Competition 6.303-1 Requirements. (a) A contracting officer... resulting from an unsolicited proposal, or award any other contract without providing for full and open...
48 CFR 6.303-1 - Requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMPETITION REQUIREMENTS Other Than Full and Open Competition 6.303-1 Requirements. (a) A contracting officer... resulting from an unsolicited proposal, or award any other contract without providing for full and open... responsible for providing and certifying as accurate and complete necessary data to support their...
48 CFR 6.303-1 - Requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMPETITION REQUIREMENTS Other Than Full and Open Competition 6.303-1 Requirements. (a) A contracting officer... resulting from an unsolicited proposal, or award any other contract without providing for full and open... responsible for providing and certifying as accurate and complete necessary data to support their...
41 CFR 105-68.900 - Adequate evidence.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Adequate evidence. 105-68.900 Section 105-68.900 Public Contracts and Property Management Federal Property Management... evidence. Adequate evidence means information sufficient to support the reasonable belief that a particular...
41 CFR 105-68.900 - Adequate evidence.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Adequate evidence. 105-68.900 Section 105-68.900 Public Contracts and Property Management Federal Property Management... evidence. Adequate evidence means information sufficient to support the reasonable belief that a particular...
41 CFR 105-68.900 - Adequate evidence.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Adequate evidence. 105-68.900 Section 105-68.900 Public Contracts and Property Management Federal Property Management... evidence. Adequate evidence means information sufficient to support the reasonable belief that a particular...
41 CFR 105-68.900 - Adequate evidence.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Adequate evidence. 105-68.900 Section 105-68.900 Public Contracts and Property Management Federal Property Management... evidence. Adequate evidence means information sufficient to support the reasonable belief that a particular...
41 CFR 105-68.900 - Adequate evidence.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Adequate evidence. 105-68.900 Section 105-68.900 Public Contracts and Property Management Federal Property Management... evidence. Adequate evidence means information sufficient to support the reasonable belief that a particular...
Statements of work handbook. [technical writing for NASA programs
NASA Technical Reports Server (NTRS)
1975-01-01
Guidelines are presented for preparing statements of work (SOW) to assure a consistent approach throughout NASA. Statements of work for study and preliminary definition contracts, for definition and development of major systems, for support services, and for small research and development contracts are discussed.
75 FR 45176 - New Postal Product
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... Product AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request to add Priority Mail Contract 25 to the competitive product list. The... associated supporting information to add Priority Mail Contract 25 to the competitive product list.\\1\\ The...
48 CFR 801.690-3 - Responsibilities under the COCP.
Code of Federal Regulations, 2010 CFR
2010-10-01
... appointment of contracting officers at the Micro-purchase Level and Level I warrant level within their... of appointment of purchase card holders at the Micro-purchase Level and Level I warrant contracting... acquisition training, continuing education, college transcripts, work experience, and other supporting...
NASA Northeast Regional Technology Transfer Center
NASA Technical Reports Server (NTRS)
Dunn, James P.
2001-01-01
This report is a summary of the primary activities and metrics for the NASA Northeast Regional Technology Transfer Center, operated by the Center for Technology Commercialization, Inc. (CTC). This report covers the contract period January 1, 2000 - March 31, 2001. This report includes a summary of the overall CTC Metrics, a summary of the Major Outreach Events, an overview of the NASA Business Outreach Program, a summary of the Activities and Results of the Technology into the Zone program, and a Summary of the Major Activities and Initiatives performed by CTC in supporting this contract. Between January 1, 2000 and March 31, 2001, CTC has facilitated 10 license agreements, established 35 partnerships, provided assistance 517 times to companies, and performed 593 outreach activities including participation in 57 outreach events. CTC also assisted Goddard in executing a successful 'Technology into the Zone' program.' CTC is pleased to have performed this contract, and looks forward to continue providing their specialized services in support of the new 5 year RTTC Contract for the Northeast region.
Student nurses' experiences of using a learning contract as a method of assessment.
Bailey, Maria E; Tuohy, Dympna
2009-10-01
The purpose of this study was to describe final year undergraduate nurses' experiences of assessment through the use of a learning contract. Using a qualitative descriptive design, data was collected from a purposive sample of final (fourth) year undergraduate student nurses. Two approaches were taken for data collection, anonymous evaluative questionnaires and interviews. The study was approved by the local university research and ethics committee. Data was thematically analysed. This article presents and discusses the findings from the interviews. Findings suggest that students' approach to the assessment strategy influenced engagement with the learning contract. Three themes were identified: skills, perceptions, and actions. Within these themes three types of learner were identified: happy, pragmatic and fearful. Factors found to influence successful completion of the learning contract were: support, relevant skills, prior experiential learning and required theoretical knowledge. Recommendations include the need for educators to consider module assessments that recognise the learning needs and preferences of the student within a supportive environment.
Integrated, automated revenue management for managed care contracts.
Burckhart, Kent
2002-04-01
Faced with increasing managed care penetration and declining net revenue in recent years, healthcare providers increasingly are emphasizing revenue management. To streamline processes and reduce costs in this area, many healthcare providers have implemented or are considering automated contract management systems. When selecting such a system, healthcare financial managers should make certain that the system can interface with both patient-accounting and decision-support systems of the organization. This integration enhances a healthcare provider's financial viability by providing integrated revenue-management capabilities to analyze projected performance of proposed managed care contracts and actual performance of existing contracts.
The impact of contracting-out on health system performance: a conceptual framework.
Liu, Xingzhu; Hotchkiss, David R; Bose, Sujata
2007-07-01
Despite the increased popularity of contracting-out of health services in developing countries, its effectiveness on overall health system performance is not yet conclusive. Except for substantial evidence of contracting-out's positive effect on access to health services and some evidence on improved equity in access, there is little evidence of contracting-out's impact on quality and efficiency. Most studies on the subject evaluate specific contracting-out projects against narrowly specified project objectives, not against more broadly defined health system goals. For this reason, conclusions of positive effects pertaining to project level may not hold at system level. This paper presents a conceptual framework that is expected to facilitate comprehensive, rigorous, and standardized evaluation of contracting-out at health system level. Specifically, this framework supports: full and standardized description of contracting-out interventions, study of the determinants of effectiveness, examination of provider and purchaser responses, assessment of the impact of contracting-out on all dimensions of health system performance, and cross-project analyses.
10 CFR 217.2 - Priorities and allocations authority.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Security with respect to essential civilian needs supporting national defense, including civil defense and... section 101 of the Defense Production Act to require acceptance and priority performance of contracts and orders (other than contracts of employment) to promote the national defense over performance of any other...
75 FR 33270 - Procurement List; Proposed Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
.... Contracting Activity: Federal Acquisition Service, GSA/FSS OFC SUP CTR--Paper Products, New York, NY. Coverage... Support Center--Paper Products. Microfiber and Metallic Scrubber Sponges (3-Pack) NSN: MR 999. NPA: New York City Industries for the Blind, Inc., Brooklyn, NY. Contracting Activity: Defense Commissary Agency...
2001-12-01
27 A. INTRODUCTION..........................................................................................27 B. MEU SUPLY OFFICER... SUPLY PERSONNEL .......................................27 C. ENLISTED CONTRACT SPECIALIST.....................................................30 D...commander to 4 identify any requirement shortfalls up the chain of command upon the receipt of orders for a specific mission. The Fleet commander
48 CFR 1835.016-71 - NASA Research Announcements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA Research Announcements... ADMINISTRATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1835.016-71 NASA Research Announcements. (a) Scope. An NRA is used to announce research interests in support of NASA's programs, and...
48 CFR 237.104 - Personal services contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... procedures do not apply to contracts awarded to business entities other than individuals. Selections made... intelligence component or counter-intelligence organization of DoD; or (iii) Directly support the mission of... travel between home or place of business and official duty station. (iii) Coordinate with the civilian...
Research and Studies Directory for Manpower, Personnel, and Training
1990-05-01
COFOD R* LICA SYSTEMS INC 703-359-0996 SMART CONTRACT PREPARATION EXPEDITER COLLINS H* ARMY TRAINING AND DOCTRINE COMMAND 205-848-3174 BATTLEFIELD...TECHNICAL SUPPORT FORESTER J HUMAN ENGINEERING LAB 301-278-2946 SMART CONTRACT PREPARATION EXPEDITER FREZELL T LTCOL HUMAN ENGINEERING LAB 301-278-5998
48 CFR 719.271-4 - Heads of contracting activities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... activities. 719.271-4 Section 719.271-4 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-4 Heads of contracting activities. In order for the agency small business program to be effective, the active support of top management...
Sheaff, R; Lloyd-Kendall, A
2000-07-01
To investigate how far English National Health Service (NHS) Personal Medical Services (PMS) contracts embody a principal-agent relationship between health authorities (HAs) and primary health care providers, especially, but not exclusively, general practices involved in the first wave (1998) of PMS pilot projects; and to consider the implications for relational and classical theories of contract. Content analysis of 71 first-wave PMS contracts. Most PMS contracts reflect current English NHS policy priorities, but few institute mechanisms to ensure that providers realise these objectives. Although PMS contracts have some classical characteristics, relational characteristics are more evident. Some characteristics match neither the classical nor the relational model. First-wave PMS contracts do not appear to embody a strong principal-agent relationship between HAs and primary health care providers. This finding offers little support for the relevance of classical theories of contract, but also implies that relational theories of contract need to be revised for quasi-market settings. Future PMS contracts will need to focus more on evidence-based processes of primary care, health outputs and patient satisfaction and less upon service inputs. PMS contracts will also need to be longer-term contracts in order to promote the 'institutional embedding' of independent general practice in the wider management systems of the NHS.
Definition of ground test for verification of large space structure control
NASA Technical Reports Server (NTRS)
Glaese, John R.
1994-01-01
Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.
Total Quality Management Office for Contracting Integrity Implementation Plan
1989-07-01
REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master
2006-01-30
He has taught contract management courses for the UCLA Government Contracts Certificate program and is also a senior faculty member for the Keller...standards for its key interfaces, and has been subjected to successful validation and verification tests to ensure the openness of its key interfaces...widely supported and consensus based standards for its key interfaces, and is subject to validation and verification tests to ensure the openness of its
2013-06-25
test Waste Water Treatment Plant” because no testing kit was onsite. The COR additionally stated he identified failed equipment and the contractor...Officer ( PCO ) confirmed with the previous ACC-Rl PCO and neither recall ever making this statement. The previous PCO recalls discussing that a QASP...performance surveillance and have access to all contract documents. Adequate contract oversight is always a concern of the PCO , in part due to the
1986-09-01
Orfice in the Aeronautical Systems Division, and the Air Force Contract Law Center, provided support that ensured success from the very start. Last, but...76 Recommendations for Future Researcn ........ .. 79 Appendix A: Air Force Contract Law Center Suggested Systems Level Warranty...analysis of the findings was accomplisned by the Air Force Contract Law Center.’ Benefits from applying a system level warranty to the C-hiO were
2015-12-01
acquisition workforce. The addition of employee turnover to the existing pressure can cause a loss of knowledge within the workforce. The typical...manpower (Gabbert, 2015). Sequestration has resulted in decreased manpower and more frequent workforce turnover , which places a strain on...on the more complex actions to the center to which they are assigned. In this way, the offices and their employees can become more specialized. B
Research to Support Intelligent Data Management
NASA Technical Reports Server (NTRS)
Lerner, B. T.
1998-01-01
This final report details the contract performance and analysis of research and development results obtained during the contract period. KT-Tech's research and development work results in the areas of registration of remotely sensed data and the test evaluation and porting of the Regional Validation Center software system are presented.
The Social Contract and the African American Elderly.
ERIC Educational Resources Information Center
Madison, Anna
1992-01-01
Explores whether or not vulnerable African-American elderly have a basic right to protection under the social contract that binds members of society as equal partners in a compact guaranteeing all members basic rights. A social justice perspective places these citizens among those who qualify for public support. (SLD)
25 CFR 273.20 - Content of application to contract.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.20 Content of...-O'Malley funds for operational support and/or supplemental programs, by line item, to facilitate accountability. (f) A clear identification of what educational needs the Johnson-O'Malley funds requested for...
25 CFR 273.20 - Content of application to contract.
Code of Federal Regulations, 2011 CFR
2011-04-01
... ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.20 Content of...-O'Malley funds for operational support and/or supplemental programs, by line item, to facilitate accountability. (f) A clear identification of what educational needs the Johnson-O'Malley funds requested for...
25 CFR 273.20 - Content of application to contract.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.20 Content of...-O'Malley funds for operational support and/or supplemental programs, by line item, to facilitate accountability. (f) A clear identification of what educational needs the Johnson-O'Malley funds requested for...
25 CFR 273.20 - Content of application to contract.
Code of Federal Regulations, 2013 CFR
2013-04-01
... ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.20 Content of...-O'Malley funds for operational support and/or supplemental programs, by line item, to facilitate accountability. (f) A clear identification of what educational needs the Johnson-O'Malley funds requested for...
25 CFR 273.20 - Content of application to contract.
Code of Federal Regulations, 2014 CFR
2014-04-01
... ASSISTANCE ACT PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.20 Content of...-O'Malley funds for operational support and/or supplemental programs, by line item, to facilitate accountability. (f) A clear identification of what educational needs the Johnson-O'Malley funds requested for...
25 CFR Appendix A to Subpart E - IRR Program Functions That Are Not Otherwise Contractible
Code of Federal Regulations, 2011 CFR
2011-04-01
... functions listed in this appendix cannot be included in a self-determination contract or self-governance... Assistance Program, Recreational Travel and Tourism, Transit Program, ERFO Program, Presidential initiatives (Millennium Trails, Lewis & Clark, Western Tourism Policy Group); 15. Participating in and supporting tribal...
48 CFR 32.410 - Findings, determination, and authorization.
Code of Federal Regulations, 2013 CFR
2013-10-01
... shall be supported by written findings (see 32.402(c)(1)(iii)). (b) The following is an example of the...), as applicable]. (6) The Contractor is a nonprofit (educational) (and) (research) institution, and the contract is for (experimental) (,) (research and development) work. (7) The contract is solely for the...
48 CFR 32.410 - Findings, determination, and authorization.
Code of Federal Regulations, 2011 CFR
2011-10-01
... shall be supported by written findings (see 32.402(c)(1)(iii)). (b) The following is an example of the...), as applicable]. (6) The Contractor is a nonprofit (educational) (and) (research) institution, and the contract is for (experimental) (,) (research and development) work. (7) The contract is solely for the...
48 CFR 32.410 - Findings, determination, and authorization.
Code of Federal Regulations, 2012 CFR
2012-10-01
... shall be supported by written findings (see 32.402(c)(1)(iii)). (b) The following is an example of the...), as applicable]. (6) The Contractor is a nonprofit (educational) (and) (research) institution, and the contract is for (experimental) (,) (research and development) work. (7) The contract is solely for the...
48 CFR 32.410 - Findings, determination, and authorization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... shall be supported by written findings (see 32.402(c)(1)(iii)). (b) The following is an example of the...), as applicable]. (6) The Contractor is a nonprofit (educational) (and) (research) institution, and the contract is for (experimental) (,) (research and development) work. (7) The contract is solely for the...
48 CFR 32.410 - Findings, determination, and authorization.
Code of Federal Regulations, 2014 CFR
2014-10-01
... shall be supported by written findings (see 32.402(c)(1)(iii)). (b) The following is an example of the...), as applicable]. (6) The Contractor is a nonprofit (educational) (and) (research) institution, and the contract is for (experimental) (,) (research and development) work. (7) The contract is solely for the...
Review of "A School Privatization Primer for Michigan School Officials, Media and Residents"
ERIC Educational Resources Information Center
Belfield, Clive
2008-01-01
Issued by the Mackinac Center for Public Policy, "A School Privatization Primer for Michigan School Officials, Media and Residents" examines the "contracting out" of public school support services--specifically food, transportation, and custodial services. The report describes the prevalence of contracting out and sets forth…
Research to Support Intelligent Data Management
NASA Technical Reports Server (NTRS)
Lerner, Bao-Ting
1998-01-01
This final report details the contract performance and analysis of research and development results obtained during the contract period. KT-TECH's research and development work results in the areas of registration of remotely sensed data and the test evaluation and porting of the Regional Validation Center software system, are presented.
Twenty-Second Annual NASA Supply and Equipment Management Conference
NASA Technical Reports Server (NTRS)
1989-01-01
The status of actions from the 1988 conference is reviewed. Environmental safety issues, definitions, and regulations; contract transition, payload logistics transition, and safety and support equipment; supply products and services, bar code technology, and inventory accuracy; equipment management workshop topics; and contract property workshop topics are outlined.
Contractor Support on the Battlefield -- Increased Reliance Requires Commander’s Attention
2006-05-16
combatant commander. The consequence is contractors on the battlefield are governed by contract law , which then begs the question how applicable is... contract law on the battlefield? Command and Control Command and control is critical to our success on the battlefield, yet America’s military has
45 CFR 2543.41 - Recipient responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... violation of statute are to be referred to such Federal, State or local authority as may have proper... under its contract(s). The recipient is the responsible authority, without recourse to the Federal... arising out of procurements entered into in support of an award or other agreement. This includes disputes...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-28
... documenting the responsibilities of all parties involved in drug manufacturing, testing, or other support... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2013-D-0558] Draft Guidance for Industry on Contract Manufacturing Arrangements for Drugs: Quality Agreements...
77 FR 28408 - Product List Changes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-14
... POSTAL REGULATORY COMMISSION [Docket No. MC2012-16 and CP2012-23; Order No. 1335] Product List... noticing a recently-filed Postal Service request to add Parcel Select Contract 2 to the competitive product... associated supporting information to add Parcel Select Contract 1 to the competitive product list.\\1\\ The...
48 CFR 9904.405-60 - Illustrations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... administrative (G&A) expense. In the contractor's proposals for final Segment G&A rates (including corporate home... responsibilities on which his salary was based, no part of the official's salary would be required to be identified... the contract. The contracting officer issues a written decision which supports the auditor's position...
48 CFR 9904.405-60 - Illustrations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... administrative (G&A) expense. In the contractor's proposals for final Segment G&A rates (including corporate home... responsibilities on which his salary was based, no part of the official's salary would be required to be identified... the contract. The contracting officer issues a written decision which supports the auditor's position...
48 CFR 9904.405-60 - Illustrations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... administrative (G&A) expense. In the contractor's proposals for final Segment G&A rates (including corporate home... responsibilities on which his salary was based, no part of the official's salary would be required to be identified... the contract. The contracting officer issues a written decision which supports the auditor's position...
Comparative Review of the Treatment Methodologies of Carotid Stenosis
Bae, Coney; Szuchmacher, Mauricio; Chang, John B.
2015-01-01
The treatment of carotid stenosis entails three methodologies, namely, medical management, carotid angioplasty and stenting (CAS), as well as carotid endarterectomy (CEA). The North American Symptomatic Carotid Endarterectomy Trial (NASCET) and European Carotid Surgery Trial (ECST) have shown that symptomatic carotid stenosis greater than 70% is best treated with CEA. In asymptomatic patients with carotid stenosis greater than 60%, CEA was more beneficial than treatment with aspirin alone according to the Asymptomatic Carotid Atherosclerosis (ACAS) and Asymptomatic Carotid Stenosis Trial (ACST) trials. When CAS is compared with CEA, the CREST resulted in similar rates of ipsilateral stroke and death rates regardless of symptoms. However, CAS not only increased adverse effects in women, it also amplified stroke rates and death in elderly patients compared with CEA. CAS can maximize its utility in treating focal restenosis after CEA and patients with overwhelming cardiac risk or prior neck irradiation. When performing CEA, using a patch was equated to a more durable result than primary closure, whereas eversion technique is a new methodology deserving a spotlight. Comparing the three major treatment strategies of carotid stenosis has intrinsic drawbacks, as most trials are outdated and they vary in their premises, definitions, and study designs. With the newly codified best medical management including antiplatelet therapies with aspirin and clopidogrel, statin, antihypertensive agents, strict diabetes control, smoking cessation, and life style change, the current trials may demonstrate that asymptomatic carotid stenosis is best treated with best medical therapy. The ongoing trials will illuminate and reshape the treatment paradigm for symptomatic and asymptomatic carotid stenosis. PMID:26417191
2014-06-01
Northridge earthquake response. The City of Los Angeles and the State of California required contracts to address recycling of demolition materials to the...materials directly recycled and material removed from the site on the enclosed recycling log found within this Contract. Documentation includes...related to recycling disaster debris: “Incentive payment: The City will pay tipping fees using the existing authorization letter; however, only source
2009-06-01
Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.
Contracting Officer's Technical Representatives
NASA Technical Reports Server (NTRS)
Brisbin, Steve
1997-01-01
The Breakout Session is a traditional conference instrument used by the NASA Occupational Health Program (OHP) as a method to convene people with common interests. Typically these sessions provide discussion of current topics of high priority and currency and allow multiple views and opinions to be shared and evaluated by all participants. Since the Contracting Officer's Technical Representatives (COTRs) occupy the technical focus of support contract management, this particular group, attended by 20 representatives, addressed issues and topics at the forefront of operational concerns.
1980-05-22
cross -referenced with the number of the data transaction listed in the data module quality con- trol list NVB Integer variable used to...Organization of the Joint Chiefs of Staff. Technical support was provided by System Sciences, Incorporated under Contract Number DCA100-75-C-0019. Change set... Contract Number DCA 100-75-C-0019. Change set two was prepared u nder Contract Number DCA 100-78-C-0035. Computer Sciences Corporation prepared change
24 CFR 888.401 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND CONTRACT RENT ANNUAL...
Space Station ECLSS Integration Analysis
NASA Technical Reports Server (NTRS)
1993-01-01
The Space Station Environmental Control and Life Support System (ECLSS) contract with NASA MSFC covered the time frame from 9 May 1985 to 31 Dec. 1992. The contract roughly covered the period of Space Station Freedom (SSF) development from early Phase B through Phase C/D Critical Design Review (CDR). During this time, McDonnell Douglas Aerospace-Huntsville (formerly McDonnell Douglas Space Systems Company) performed an analytical support role to MSFC for the development of analytical math models and engineering trade studies related to the design of the ECLSS for the SSF.
Recipe for Success: Digital Viewables
NASA Technical Reports Server (NTRS)
LaPha, Steven; Gaydos, Frank
2014-01-01
The Engineering Services Contract (ESC) and Information Management Communication Support contract (IMCS) at Kennedy Space Center (KSC) provide services to NASA in respect to flight and ground systems design and development. These groups provides the necessary tools, aid, and best practice methodologies required for efficient, optimized design and process development. The team is responsible for configuring and implementing systems, software, along with training, documentation, and administering standards. The team supports over 200 engineers and design specialists with the use of Windchill, Creo Parametric, NX, AutoCAD, and a variety of other design and analysis tools.
HL-20 operations and support requirements for the Personnel Launch System mission
NASA Technical Reports Server (NTRS)
Morris, W. D.; White, Nancy H.; Caldwell, Ronald G.
1993-01-01
The processing, mission planning, and support requirements were defined for the HL-20 lifting-body configuration that can serve as a Personnel Launch System. These requirements were based on the assumption of an operating environment that incorporates aircraft and airline support methods and techniques that are applicable to operations. The study covered the complete turnaround process for the HL-20, including landing through launch, and mission operations, but did not address the support requirements of the launch vehicle except for the integrated activities. Support is defined in terms of manpower, staffing levels, facilities, ground support equipment, maintenance/sparing requirements, and turnaround processing time. Support results were drawn from two contracted studies, plus an in-house analysis used to define the maintenance manpower. The results of the contracted studies were used as the basis for a stochastic simulation of the support environment to determine the sufficiency of support and the effect of variance on vehicle processing. Results indicate the levels of support defined for the HL-20 through this process to be sufficient to achieve the desired flight rate of eight flights per year.
Montes, Samantha D; Irving, P Gregory
2008-11-01
Psychological contracts contain both relational and transactional elements, each of which is associated with unique characteristics. In the present research, the authors drew on these distinct qualities to develop and test hypotheses regarding differential employee reactions to underfulfillment, fulfillment, and overfulfillment of relational and transactional promises. Further, the authors extended their test of the theoretical distinctions between relational and transactional contracts by assessing the relevance of trust as a key underlying mechanism of relational and transactional psychological contract breach effects. Participants in this 3-wave longitudinal study included 342 full-time temporary employees. In support of existing theoretical distinctions, results indicated that employees reacted differently to varying levels of fulfillment of their relational and transactional contracts and that trust is a more central mechanism of relational, as opposed to transactional, psychological contract breach effects. These findings underscore L.S. Lambert, J. R. Edwards, and D. M. Cable's (2003) recent recommendation that the traditional conceptualization and study of psychological contract breach requires expansion.
48 CFR 1204.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...
48 CFR 1204.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...
48 CFR 1204.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...
48 CFR 1204.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...
48 CFR 1204.804-570 - Supporting closeout documents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Supporting closeout documents. 1204.804-570 Section 1204.804-570 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION GENERAL ADMINISTRATIVE MATTERS Government Contract Files 1204.804-570 Supporting closeout...
Process Improvement for Interinstitutional Research Contracting
Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca
2015-01-01
Abstract Introduction Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. Methods The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Results Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the “business entity” was the research support personnel of both healthcare systems whose “customers” were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). Conclusions The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. PMID:26083433
Contracts in radiology practices: contract types and key provisions.
Muroff, Julie A; Muroff, Lawrence R
2004-07-01
A contract between a radiology group and its physician member(s) provides the foundation for the professional relationships in a group practice. The parties are not in positions of parity; contract provisions are structured to maintain the primacy of the group over the individual members. An integration clause should be included to preclude reliance on communications that are not memorialized by the language of the contract. Precise, unambiguous terms must be used to convey the intentions of the parties. The contract should have a clear date of initiation and, if applicable, an effective date of termination. Mechanisms for termination and modification should be expressed clearly to minimize the risk of judicial interference. The method of determining and adjusting the salary and other benefits of the radiologist should be stated, as consideration is necessary to support the existence of a legal contract. The obligations of the radiologist to the practice are often stated in general terms to maximize the group's flexibility. Finally, other key clauses that are discussed in the paper should be incorporated into the contract.
Process Improvement for Interinstitutional Research Contracting.
Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca
2015-08-01
Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.
24 CFR 886.110 - Contract rents.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... three years all certifications and relevant documentation under this paragraph (c). [42 FR 5603, Jan. 28...
24 CFR 882.408 - Initial contract rents.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH... Market Rents. The PHA must submit documentation demonstrating the necessity for such exception rents in...
24 CFR 886.110 - Contract rents.
Code of Federal Regulations, 2011 CFR
2011-04-01
... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... three years all certifications and relevant documentation under this paragraph (c). [42 FR 5603, Jan. 28...
24 CFR 882.408 - Initial contract rents.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH... Market Rents. The PHA must submit documentation demonstrating the necessity for such exception rents in...
NASA Technical Reports Server (NTRS)
Eastman, L. F.; Wicks, G. W.
1987-01-01
This project was proposed to be a three-year contract, but was cut off after one year (1987) of support. Sufficient progress was made to allow continuation for a year on minimal internal funds before proper support levels were received from a combination of ONR, RADC, and IBM contracts at about the start of 1989. A major DARPA grant, expected to start August 1, 1990, will sharply expand this effort to include several faculty members. During the course of this project, two students did thesis research, one Ph.D. on lasers and one M.S. on high speed photodetectors. These theses were finished in September 1988, nine months after the contract was cut off. This report covers excerpts from those theses as well as information obtained on other programs since that time.
7 CFR 763.3 - Full faith and credit.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 7 2013-01-01 2013-01-01 false Full faith and credit. 763.3 Section 763.3 Agriculture... SPECIAL PROGRAMS LAND CONTRACT GUARANTEE PROGRAM § 763.3 Full faith and credit. (a) The land contract guarantee constitutes an obligation supported by the full faith and credit of the United States. The Agency...
7 CFR 763.3 - Full faith and credit.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 7 2014-01-01 2014-01-01 false Full faith and credit. 763.3 Section 763.3 Agriculture... SPECIAL PROGRAMS LAND CONTRACT GUARANTEE PROGRAM § 763.3 Full faith and credit. (a) The land contract guarantee constitutes an obligation supported by the full faith and credit of the United States. The Agency...
Characterization of 8-cm engineering model thruster
NASA Technical Reports Server (NTRS)
Williamson, W. S.
1984-01-01
Development of 8 cm ion thruster technology which was conducted in support of the Ion Auxiliary Propulsion System (IAPS) flight contract (Contract NAS3-21055) is discussed. The work included characterization of thruster performance, stability, and control; a study of the effects of cathode aging; environmental qualification testing; and cyclic lifetesting of especially critical thruster components.
48 CFR 217.172 - Multiyear contracts for supplies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... contract for— (1) A weapon system and associated items, services, and logistics support for a weapon system... after the completion of a cost analysis performed by the Defense Cost and Resource Center of the... Logistics (10 U.S.C. 2306b(i)(6)). (7) The Secretary of Defense shall send a notification containing the...
48 CFR 217.172 - Multiyear contracts for supplies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... contract for— (1) A weapon system and associated items, services, and logistics support for a weapon system... after the completion of a cost analysis performed by the Defense Cost and Resource Center of the... Logistics (10 U.S.C. 2306b(i)(6)). (7) The Secretary of Defense shall send a notification containing the...
48 CFR 217.172 - Multiyear contracts for supplies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contract for— (1) A weapon system and associated items, services, and logistics support for a weapon system... after the completion of a cost analysis performed by the Defense Cost and Resource Center of the... Logistics (10 U.S.C. 2306b(i)(6)). (7) The Secretary of Defense shall send a notification containing the...
48 CFR 217.172 - Multiyear contracts for supplies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... contract for— (1) A weapon system and associated items, services, and logistics support for a weapon system... after the completion of a cost analysis performed by the Defense Cost and Resource Center of the... Logistics (10 U.S.C. 2306b(i)(6)). (7) The Secretary of Defense shall send a notification containing the...
Weaknesses in Awarding Fees for the Broad Area Maritime Surveillance Contract
2010-11-02
Table of Contents Introduction 1 Audit Objectives 1 Background on Broad Area Maritime Surveillance 1...24 Mangement Comments The Assistant Secretary of the Navy for Research, Development, and Acquisition 25... Introduction Audit Objectives This is the first in a series of reports on the contract supporting the Broad Area Maritime
Michigan School Privatization Survey 2009
ERIC Educational Resources Information Center
Hohman, James M.; Imhoff, Eric R.
2009-01-01
With Michigan's public school districts facing a decline in per-pupil funding, more districts are contracting out for at least one of the three major school support services--food, custodial and transportation--than ever before. This year's survey of school districts found that 44.6 percent of all Michigan school districts contract out for at…
78 FR 61113 - Acquisition Process: Task and Delivery Order Contracts, Bundling, Consolidation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-02
... that a total set-aside is not appropriate but the procurement can be broken up into smaller discrete... discrete components to support a partial set-aside and market research shows that either: at least two... could divide a multiple award contract for divergent goods and services into discrete categories (which...
25 CFR 900.145 - On what basis may the Secretary deny a waiver request?
Code of Federal Regulations, 2010 CFR
2010-04-01
... HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND... written finding. The finding must clearly demonstrate (or be supported by controlling legal authority... resources is not assured; (c) The proposed project or function to be contracted for cannot be properly...
Do School Boards Still Have Options? The Erosion of Management Authority.
ERIC Educational Resources Information Center
Lieberman, Myron
1997-01-01
School boards are woefully unprepared to deal with "make or buy" issues, due to massive union efforts to eliminate or restrict board freedom to contract for services. Teachers neither understand nor support a market economy. School boards' contracting out ability will not be secure until favorable legislative options are considered and…
A Contracign out Success Story
NASA Technical Reports Server (NTRS)
Davis, Esker K.
1993-01-01
This paper is based on the highly successfull Mission and Computing Support (MACS) Contract, between the Jet Propulsion Laboratory (JPL) and OAO Corporation, which encompasses a comprehensive set of work for information systems and services. JPL awarded the MACS contract in 1988 and saw very succeful operation during the first five years which were recently completed.
48 CFR 16.603-4 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... clause at 52.216-24, Limitation of Government Liability, with dollar amounts completed in a manner...) completed in a manner consistent with 16.603-2(c). If at the time of entering into the letter contract, the... words “and certified cost or pricing data in accordance with FAR 15.408, Table 15-2 supporting its...
Contractile recovery of microtissues after giant shear events
NASA Astrophysics Data System (ADS)
Morley, Cameron; Bhattacharjee, Tapomoy; Ellison, Sarah; Sawyer, W.; Angelini, Thomas
Cells are often dispersed in extracellular matrix (ECM) gels like collagen and Matrigel as minimal tissue models. Generally, large-scale contraction of these constructs is observed, in which the degree of contraction of the entire system correlates with cell density and ECM concentration. The freedom to perform diverse mechanical experiments on these contracting constructs is limited by the challenges of handling and supporting these delicate samples. Here, we present a method to create simple cell-ECM constructs that can be manipulated with significantly reduced experimental limitations. We 3D print mixtures of MCF10A cells and ECM (collagen-I and Matrigel) into a 3D growth medium made from jammed microgels. With this approach, we are able to apply shear stresses to the cell constructs times after printing and observe the collective response. Preliminary results reveal that, following shear deformations that exceed 300% and dramatically smear cells and matrix in space, the cells actively re-contract the construct toward the un-sheared construct. These results suggest that new principles of collective recovery can be employed for tissue engineering applications using jammed microgels as a re-configurable support medium.
40 CFR 35.6240 - Eligibility for support agency Cooperative Agreements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6240 Eligibility for...
40 CFR 35.6240 - Eligibility for support agency Cooperative Agreements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6240 Eligibility for...
40 CFR 35.6240 - Eligibility for support agency Cooperative Agreements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6240 Eligibility for...
40 CFR 35.6240 - Eligibility for support agency Cooperative Agreements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Support Agency Cooperative Agreements § 35.6240 Eligibility for...
24 CFR 888.420 - One-time Contract Rent determination.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND...
10 CFR 603.305 - Use of a fixed-support TIA.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Use of a fixed-support TIA. 603.305 Section 603.305 Energy... Expenditure-Based and Fixed-Support Technology Investment Agreements § 603.305 Use of a fixed-support TIA. The contracting officer may use a fixed-support TIA if: (a) The agreement is to support or stimulate RD&D with...
24 CFR 886.310 - Initial contract rents.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH... and do not exceed 120 percent of the most recently published Section 8 Fair Market Rents for Existing...
24 CFR 888.203 - Use of contract rent automatic annual adjustment factors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DIRECT LOAN PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET...
Siddiqi, Sameen; Masud, Tayyeb Imran; Sabri, Belgacem
2006-01-01
The public sector in developing countries is increasingly contracting with the non-state sector to improve access, efficiency and quality of health services. We conducted a multicountry study to assess the range of health services contracted out, the process of contracting and its influencing factors in ten countries of the Eastern Mediterranean Region: Afghanistan, Bahrain, Egypt, Islamic Republic of Iran, Jordan, Lebanon, Morocco, Pakistan, the Syrian Arab Republic and Tunisia. Our results showed that Afghanistan, Egypt, Islamic Republic of Iran and Pakistan had experience with outsourcing of primary care services; Jordan, Lebanon and Tunisia extensively contracted out hospital and ambulatory care services; while Bahrain, Morocco and the Syrian Arab Republic outsourced mainly non-clinical services. The interest of the non-state sector in contracting was to secure a regular source of revenue and gain enhanced recognition and credibility. While most countries promoted contracting with the private sector, the legal and bureaucratic support in countries varied with the duration of experience with contracting. The inherent risks evident in the contracting process were reliance on donor funds, limited number of providers in rural areas, parties with vested interests gaining control over the contracting process, as well as poor monitoring and evaluation mechanisms. Contracting provides the opportunity to have greater control over private providers in countries with poor regulatory capacity, and if used judiciously can improve health system performance. PMID:17143460
Association Between Monetary Deposits and Weight Loss in Online Commitment Contracts
Lesser, Lenard I.; Thompson, Caroline A.; Luft, Harold S.
2017-01-01
Purpose To examine the characteristics of voluntary online commitment contracts that may be associated with greater weight loss. Design Retrospective analysis of weight loss commitment contracts derived from a company that provides web-based support for personal commitment contracts. Using regression, we analyzed whether percentage weight loss differed between participants who incentivized their contract using monetary deposits and those who did not. Setting Online. Participants Users (N = 3857) who voluntarily signed up online in 2013 for a weight loss contract. Intervention Participants specified their own weight loss goal, time period, and self-reported weekly weight. Deposits were available in the following 3 categories: charity, anticharity (a nonprofit one does not like), or donations made to a friend. Measures Percentage weight loss per week. Analysis Multivariable linear regressions. Results Controlling for several participant and contract characteristics, contracts with anticharity, charity, and friend deposits had greater reported weight loss than nonincentivized contracts. Weight change per week relative to those without deposits was −0.33%, −0.28%, and −0.25% for anti-charity, charity, and friend, respectively (P < 0.001). Contracts without a weight verification method claimed more weight loss than those with verification. Conclusion Voluntary use of commitment contracts may be an effective tool to assist weight loss. Those who choose to use monetary incentives report more weight loss. It is not clear whether this is due to the incentives or higher motivation. PMID:27502832
Siddiqi, Sameen; Masud, Tayyeb Imran; Sabri, Belgacem
2006-11-01
The public sector in developing countries is increasingly contracting with the non-state sector to improve access, efficiency and quality of health services. We conducted a multicountry study to assess the range of health services contracted out, the process of contracting and its influencing factors in ten countries of the Eastern Mediterranean Region: Afghanistan, Bahrain, Egypt, Islamic Republic of Iran, Jordan, Lebanon, Morocco, Pakistan, the Syrian Arab Republic and Tunisia. Our results showed that Afghanistan, Egypt, Islamic Republic of Iran and Pakistan had experience with outsourcing of primary care services; Jordan, Lebanon and Tunisia extensively contracted out hospital and ambulatory care services; while Bahrain, Morocco and the Syrian Arab Republic outsourced mainly non-clinical services. The interest of the non-state sector in contracting was to secure a regular source of revenue and gain enhanced recognition and credibility. While most countries promoted contracting with the private sector, the legal and bureaucratic support in countries varied with the duration of experience with contracting. The inherent risks evident in the contracting process were reliance on donor funds, limited number of providers in rural areas, parties with vested interests gaining control over the contracting process, as well as poor monitoring and evaluation mechanisms. Contracting provides the opportunity to have greater control over private providers in countries with poor regulatory capacity, and if used judiciously can improve health system performance.
Convergence of Cardinal Series.
1985-06-01
2Supported by International Business Machines Corporation and National Science Foundation Grant No. DMS-8351187. 3Supported by NSERC Canada through Grant...S,, iff suppf C fl. (1) Sponsored by the United States Army under Contract No. DAAG29-80-C-0041. (2) Supported by International Business Machines
NASA Technical Reports Server (NTRS)
Richards, Hadley T.
1954-01-01
A turbine blade with a porous stainless-steel shell sintered to a supporting steel strut has been fabricated for tests at the NACA by Federal-Mogul Corporation under contract from the Bureau of Aeronautics, Department of the Navy. The apparent permeability of this blade, on the average, more nearly approaches the values specified by the NAGA than did two strut-supported bronze blades in a previous investigation. Random variations of permeability in the present blade are substantialy greater than those of the bronze blades, but projected improvements in certain phases of the fabrication process are expected to reduce these variations.
Correlates Between Force and Postural Tremor in Older Individuals with Essential Tremor.
Kavanagh, Justin J; Keogh, Justin W L
2016-12-01
Essential tremor (ET) is commonly associated with kinetic tremor. However, other forms of tremor, such as force and postural tremor, may occur in ET with less severity. This study objectively assessed force and postural tremor characteristics in ET with the purpose of identifying the relationships between these tremors. Ten individuals with ET (age 71 ± 5 years) and ten healthy controls (age 70 ± 5 years) participated in the study. Force tremor was quantified as fluctuations in index finger abduction force during isometric contractions at 10 % maximum voluntary contraction (MVC) and 60 % MVC. Postural tremor was quantified as index finger acceleration when the subjects held their entire arm unsupported, and when their arm was supported so that only the index finger could move. Time- and frequency-domain parameters were extracted from tremor data, and then correlations within, and between, tremor subtypes were examined. ET force tremor was dependent on contraction intensity whereas postural tremor was unaffected by the level of limb support. Significant correlations existed between frequency components of postural tremor and force tremor amplitude. Force tremor amplitude normalised to the level of contraction intensity correlated to the proportion of power for postural tremor. These correlations were observed for both contraction intensities and both levels of postural support. The proportion of power represents the output of central oscillators in ET patients and therefore correlated well to force tremor. Given that significant relationships existed between spectral features of postural tremor and the overall force tremor amplitude, it is clear that these tremor modalities are not completely independent in older adults with ET.
2009-10-30
review of the invoices submitted in support of the GMASS contract. S PE CI AL I NS PECTO R GE NE R AL FO R I RA Q RE CO NST R UC TIO N...Command-Iraq (MNSTC- I ), using the Iraq Security Forces Fund, issued task orders for a program to assist the Iraqi Army in developing a self...its first tier subcontractor. According to contracting and MNSTC- I officials, Anham had the capability to obtain foreign military vehicle parts
Hu, Xiao; Blemker, Silvia S
2015-08-01
Duchenne muscular dystrophy (DMD) is a genetic disease that occurs due to the deficiency of the dystrophin protein. Although dystrophin is deficient in all muscles, it is unclear why degeneration progresses differently across muscles in DMD. We hypothesized that each muscle undergoes a different degree of eccentric contraction during gait, which could contribute to the selective degeneration in lower limb muscle, as indicated by various amounts of fatty infiltration. By comparing eccentric contractions quantified from a previous multibody dynamic musculoskeletal gait simulation and fat fractions quantified in a recent imaging study, our preliminary analyses show a strong correlation between eccentric contractions during gait and lower limb muscle fat fractions, supporting our hypothesis. This knowledge is critical for developing safe exercise regimens for the DMD population. This study also provides supportive evidence for using multiscale modeling and simulation of the musculoskeletal system in future DMD research. © 2015 Wiley Periodicals, Inc.
7 CFR 763.3 - Full faith and credit.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 7 2012-01-01 2012-01-01 false Full faith and credit. 763.3 Section 763.3 Agriculture... SPECIAL PROGRAMS LAND CONTRACT GUARANTEE PROGRAM (Eff. 1-3-12) § 763.3 Full faith and credit. (a) The land contract guarantee constitutes an obligation supported by the full faith and credit of the United States...
23 CFR 635.124 - Participation in contract claim awards and settlements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... public contract law. (b) The FHWA shall be made aware by the STD of the details of the claim at an early...) When requesting Federal participation, the STD shall set forth in writing the legal and contractual.... Federal-aid participation in such instances shall be supported by a STD audit of the actual costs incurred...
23 CFR 635.124 - Participation in contract claim awards and settlements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... public contract law. (b) The FHWA shall be made aware by the STD of the details of the claim at an early...) When requesting Federal participation, the STD shall set forth in writing the legal and contractual.... Federal-aid participation in such instances shall be supported by a STD audit of the actual costs incurred...
Code of Federal Regulations, 2010 CFR
2010-01-01
... include a provision setting forth the type of events that are covered events under the contract. The type...) Litigation in State, Federal, local, or tribal courts, including appeals of Commission decisions related to..., including but not limited to the following types of events: (i) The sponsor's failure to comply with...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... subcontractor, Computer Sciences Corporation (CSC), of the same address, provide IT support services related to... Vista Computer Services, under Contract Number 68-W3-0032. From October 1, 1998 until March 31, 2004, the contractor was Vista Computer Services, under Contract Number 68-W-98-230. From April 1, 2004...
24 CFR 246.8 - Materials to be submitted to HUD in support of preemption request.
Code of Federal Regulations, 2011 CFR
2011-04-01
... separate breakdown of rent loss due to tenant turnover for the past 2 years. (6) A certified statement... by the following: (i) Tax rates or appraisals, (ii) Utility rates, (iii) Contracts for employees or... appraisals, (ii) Utility rates, (iii) Contracts for employees or services, (iv) Insurance. If there are none...
13 CFR 125.19 - When may a contracting officer set-aside a procurement for SDVO SBCs?
Code of Federal Regulations, 2013 CFR
2013-01-01
... be made at fair market prices. This requirement does not preclude a contracting officer from making... delivery and award will be made at fair market prices. However, after conducting market research, the... rationale used to support the specific set-aside, including the type and extent of market research conducted...
48 CFR Appendix B to Part 1232 - Instructions for Completing the SF 1035
Code of Federal Regulations, 2010 CFR
2010-10-01
... generally entered below the line with Number and Date of Order; Date of Delivery or Service; Articles or... of data to be inserted as it applies to the contract or order number. a. Show, as applicable, the... Government's interest. b. Show the following costs and supporting data (as applicable) to the contract or...
Harling, Guy; Morris, Katherine Ann; Manderson, Lenore; Perkins, Jessica M; Berkman, Lisa F
2018-03-26
Drawing on the "Health and Aging in Africa: A Longitudinal Study of an INDEPTH community in South Africa" (HAALSI) baseline survey, we present data on older adults' social networks and receipt of social support in rural South Africa. We examine how age and gender differences in social network characteristics matched with patterns predicted by theories of choice- and constraint-based network contraction in older adults. We used regression analysis on data for 5,059 South African adults aged 40 and older. Older respondents reported fewer important social contacts and less frequent communication than their middle-aged peers, largely due to fewer nonkin connections. Network size difference between older and younger respondents was greater for women than for men. These gender and age differences were explicable by much higher levels of widowhood among older women compared to younger women and older men. There was no evidence for employment-related network contraction or selective retention of emotionally supportive ties. Marriage-related structural constraints impacted on older women's social networks in rural South Africa, but did not explain choice-based network contraction. These findings suggest that many older women in rural Africa, a growing population, may have an unmet need for social support.
24 CFR 3280.608 - Hangers and supports.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Hangers and supports. (a) Strains and stresses. Piping in a plumbing system shall be installed without undue strains and stresses, and provision shall be made for expansion, contraction, and structural..., plastic drainage piping shall be supported at intervals not to exceed 4 feet and plastic water piping...
24 CFR 3280.608 - Hangers and supports.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Hangers and supports. (a) Strains and stresses. Piping in a plumbing system shall be installed without undue strains and stresses, and provision shall be made for expansion, contraction, and structural..., plastic drainage piping shall be supported at intervals not to exceed 4 feet and plastic water piping...
48 CFR 25.301-2 - Government support.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Government support. 25.301... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Contracts Performed Outside the United States 25.301-2 Government..., determines that— (1) Such Government support is available and is needed to ensure continuation of essential...
48 CFR 25.301-2 - Government support.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government support. 25.301... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Contracts Performed Outside the United States 25.301-2 Government..., determines that— (1) Such Government support is available and is needed to ensure continuation of essential...
48 CFR 25.301-2 - Government support.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Government support. 25.301... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Contracts Performed Outside the United States 25.301-2 Government..., determines that— (1) Such Government support is available and is needed to ensure continuation of essential...
48 CFR 25.301-2 - Government support.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Government support. 25.301... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Contracts Performed Outside the United States 25.301-2 Government..., determines that— (1) Such Government support is available and is needed to ensure continuation of essential...
48 CFR 25.301-2 - Government support.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Government support. 25.301... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Contracts Performed Outside the United States 25.301-2 Government..., determines that— (1) Such Government support is available and is needed to ensure continuation of essential...
YFa and analogs: investigation of opioid receptors in smooth muscle contraction.
Kumar, Krishan; Goyal, Ritika; Mudgal, Annu; Mohan, Anita; Pasha, Santosh
2011-10-28
To study the pharmacological profile and inhibition of smooth muscle contraction by YFa and its analogs in conjunction with their receptor selectivity. The effects of YFa and its analogs (D-Ala2) YFa, Y (D-Ala2) GFMKKKFMRF amide and Des-Phe-YGGFMKKKFMR amide in guinea pig ileum (GPI) and mouse vas deferens (MVD) motility were studied using an isolated tissue organ bath system, and morphine and DynA (1-13) served as controls. Acetylcholine was used for muscle stimulation. The observations were validated by specific antagonist pretreatment experiments using naloxonazine, naltrindole and norbinaltorphimine norBNI. YFa did not demonstrate significant inhibition of GPI muscle contraction as compared with morphine (15% vs 62%, P = 0.0002), but moderate inhibition of MVD muscle contraction, indicating the role of κ opioid receptors in the contraction. A moderate inhibition of GPI muscles by (Des-Phe) YFa revealed the role of anti-opiate receptors in the smooth muscle contraction. (D-Ala-2) YFa showed significant inhibition of smooth muscle contraction, indicating the involvement of mainly δ receptors in MVD contraction. These results were supported by specific antagonist pretreatment assays. YFa revealed its side-effect-free analgesic properties with regard to arrest of gastrointestinal transit. The study provides evidences for the involvement of κ and anti-opioid receptors in smooth muscle contraction.
Klausner, Adam P; Rourke, Keith F; Miner, Amy S; Ratz, Paul H
2009-03-15
In strips of rabbit bladder free of urothelium, the beta-adrenoceptor agonist, isoproterenol, significantly reduced basal detrusor smooth muscle tone and inhibited contractions produced by low concentrations of the muscarinic receptor agonist, carbachol. During a carbachol concentration-response curve, instead of inhibiting, isoproterenol strengthened contractions produced by high carbachol concentrations. Thus, the carbachol concentration-response curve was shifted by isoproterenol from a shallow, graded relationship, to a steep, switch-like relationship. The tyrosine kinase inhibitor, genistein, inhibited carbachol-induced contractions only in the presence of isoproterenol. Contraction produced by a single high carbachol concentration (1 microM) displayed 1 fast and 1 slow peak. In the presence of isoproterenol, the slow peak was not strengthened, but was delayed, and U-0126 (mitogen-activated protein kinase kinase inhibitor) selectively inhibited this delay concomitantly with inhibition of extracellular signal-regulated kinase (ERK) phosphorylation. Isoproterenol reduced ERK phosphorylation only in the absence of carbachol. These data support the concept that, by inhibiting weak contractions, potentiating strong contractions, and producing a more switch-like concentration-response curve, beta-adrenoceptor stimulation enhanced the effectiveness of muscarinic receptor-induced detrusor smooth muscle contraction. Moreover, beta-adrenoceptor stimulation changed the cellular mechanism by which carbachol produced contraction. The potential significance of multi-receptor and multi-cell crosstalk is discussed.
Gould, Jeffrey R.; Enoka, Roger M.
2013-01-01
The purpose of the study was to compare the discharge characteristics of biceps brachii motor units of young and old adults when they performed steady, submaximal contractions while the arm supported different inertial loads. Young (28 ± 4 yr; n = 16) and old (75 ± 4 yr; n = 14) adults performed steady contractions with the elbow flexors at target forces set at either small (11.7 ± 4.4% maximum) or large (17.8 ± 6.5% maximum) differences below the recruitment threshold force of the motor unit (n = 40). The task was to maintain an elbow angle at 1.57 rad until the motor unit was recruited and discharged action potentials for ∼120 s. Time to recruitment was longer for the larger target force difference (187 ± 227 s vs. 23 ± 46 s, P < 0.001). Once recruited, motor units discharged action potentials either repetitively or intermittently, with a greater proportion of motor units exhibiting the repetitive pattern for old adults. Discharge rate at recruitment and during the steady contraction was similar for the two target force differences for old adults but was greater for the small target force difference for young adults. Discharge variability was similar at recruitment for the two age groups but less for the old adults during the steady contraction. The greatest difference between the present results and those reported previously when the arm pulled against a rigid restraint was that old adults modulated discharge rate less than young adults across the two contraction intensities for both load types. PMID:23221403
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and other support, except for certain derivatives instruments. 229.1114 Section 229.1114 Commodity and... support, except for certain derivatives instruments. (a) Descriptive information. To the extent material..., guaranteed investment contracts and minimum principal payment agreements. (3) Any derivatives whose primary...
2005-09-30
Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project William R. Metzger Marine...Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT
48 CFR 215.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Contract Pricing 215.404-2 Information to support proposal analysis. See PGI 215.404-2 for guidance on... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Information to support proposal analysis. 215.404-2 Section 215.404-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...
48 CFR 215.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Contract Pricing 215.404-2 Information to support proposal analysis. See PGI 215.404-2 for guidance on... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Information to support proposal analysis. 215.404-2 Section 215.404-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...
48 CFR 215.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Contract Pricing 215.404-2 Information to support proposal analysis. See PGI 215.404-2 for guidance on... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Information to support proposal analysis. 215.404-2 Section 215.404-2 Federal Acquisition Regulations System DEFENSE ACQUISITION...
Spring is a good time to clean up your vendor contracts.
Daigrepont, Jeffery
2013-01-01
Whether it's a new purchase or renewal, every year physicians and hospitals obligate themselves financially to vendor contracts without fully understanding the terms and conditions of their commitments. Some of these contracts renew automatically without permission or approval and come with automatic price increases. In some cases, practices may even be paying for services no longer being used or maintenance fees for support services no longer needed. However, discerning what vendor and system to select or renew, based on the unique objectives of the practice or hospital, can be overwhelming. This article provides many helpful strategies for negotiating a rock-solid contract that is a win for the physician practice or hospital and holds the vendor accountable for delivery of promises.
The Weyl law for contractive maps
NASA Astrophysics Data System (ADS)
Spina, Maria E.; Rivas, Alejandro M. F.; Carlo, Gabriel
2013-11-01
We find an empirical Weyl law followed by the eigenvalues of contractive maps. An important property is that it is mainly insensitive to the dimension of the corresponding invariant classical set, the strange attractor. The usual explanation for the fractal Weyl law emergence in scattering systems (i.e., having a projective opening) is based on the classical phase space distributions evolved up to the quantum to classical correspondence (Ehrenfest) time. In the contractive case this reasoning fails to describe it. Instead, we conjecture that the support for this behavior is essentially given by the strong non-orthogonality of the eigenvectors of the contractive superoperator. We test the validity of the Weyl law and this conjecture on two paradigmatic systems, the dissipative baker and kicked top maps.
24 CFR 886.334 - Execution of housing assistance payments contract.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DIRECT LOAN PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE... Market Rent or the exception rent provided in § 886.310 in effect at the time of execution of the...
NASA Extends Chandra X-ray Observatory Contract with the Smithsonian Astrophysical Observatory
NASA Astrophysics Data System (ADS)
2002-07-01
NASA NASA has extended its contract with the Smithsonian Astrophysical Observatory in Cambridge, Mass. to August 2003 to provide science and operational support for the Chandra X- ray Observatory, one of the world's most powerful tools to better understand the structure and evolution of the universe. The contract is an 11-month period of performance extension to the Chandra X-ray Center contract, with an estimated value of 50.75 million. Total contract value is now 298.2 million. The contract extension resulted from the delay of the launch of the Chandra X-ray Observatory from August 1998 to July 1999. The revised period of performance will continue the contract through Aug. 31, 2003, which is 48 months beyond operational checkout of the observatory. The contract type is cost reimbursement with no fee. The contract covers mission operations and data analysis, which includes both the observatory operations and the science data processing and general observer (astronomer) support. The observatory operations tasks include monitoring the health and status of the observatory and developing and distributing by satellite the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning, and coordination of science observations with the general observers and the processing and delivery of the resulting scientific data. Each year, there are on the order of 200 to 250 observing proposals selected out of about 800 submitted, with a total amount of observing time about 20 million seconds. X-ray astronomy can only be performed from space because Earth's atmosphere blocks X-rays from reaching the surface. The Chandra Observatory travels one-third of the way to the Moon during its orbit around the Earth every 64 hours. At its highest point, Chandra's highly elliptical, or egg-shaped, orbit is 200 times higher than that of its visible-light- gathering sister, the Hubble Space Telescope. NASA's Marshall Space Flight Center, Huntsville, Ala., manages the Chandra Program for the Office of Space Science in Washington. The development contractor for the spacecraft was TRW, Inc., Redondo Beach, Calif. The Smithsonian's Chandra X-ray Center controls science and flight operations from Cambridge.
Effective Team Support: From Modeling to Software Agents
NASA Technical Reports Server (NTRS)
Remington, Roger W. (Technical Monitor); John, Bonnie; Sycara, Katia
2003-01-01
The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and engineers and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in modeling infrastructure and task infrastructure. Work is continuing under a different contract to complete empirical data collection, cognitive modeling, and the building of software agents to support the teams task.
Are Emotions Transmitted From Work to Family? A Crossover Model of Psychological Contract Breach.
Liang, Huai-Liang
2018-01-01
Based on affective events theory and the crossover model, this study examines the effect of psychological contract breach on employee dysfunctional behavior and partner family undermining and explores the crossover effect of employee dysfunctional behavior on partner family undermining in work-family issues. This study collected 370 employee-partner dyads (277 male employees, 93 female employees, M age = 43.59 years) from a large manufacturing organization. The results of this study support the conception that employees' psychological contract breach results in frustration in the workplace. In addition, mediation analysis results reveal that psychological contract breach relates to employee dysfunctional behavior in the workplace. The findings show that partners' psychological strain mediates the relationship between employee dysfunctional behavior and partner family undermining. Furthermore, these findings provide investigations for the crossover model to display the value of psychological contract breach in family issues.
Contracting with the Enemy: The Contracting Officer’s Dilemma
2015-06-01
Acquisition Research Program Graduate School of Business & Public Policy Naval Postgraduate School NPS-CM-15-133 ACQUISITION RESEARCH PROGRAM...Thesis Advisors: Dr. Max Kidalov, Assistant Professor E. Cory Yoder, Senior Lecturer Graduate School of Business & Public Policy Naval Postgraduate...Program Graduate School of Business & Public Policy Naval Postgraduate School The research presented in this report was supported by the Acquisition
Mustafa, Zead; Jaradat, Mohammed M M; Ansari, Arslan Hojat; Popović, Branislav Z; Jaradat, Husein M
2016-01-01
In this paper, by using the C-class functions and a new approach we present some coincidence point results for four mappings satisfying generalized [Formula: see text]-weakly contractive condition in the setting of ordered b-metric spaces. Also, an application and example are given to support our results.
Past and ongoing shifts in Joshua tree distribution support future modeled range contraction
Kenneth L. Cole; Kirsten Ironside; Jon Eischeid; Gregg Garfin; Phillip B. Duffy; Chris Toney
2011-01-01
The future distribution of the Joshua tree (Yucca brevifolia) is projected by combining a geostatistical analysis of 20th-century climates over its current range, future modeled climates, and paleoecological data showing its response to a past similar climate change. As climate rapidly warmed ~11 700 years ago, the range of Joshua tree contracted, leaving only the...
Defense AT and L Magazine. Vol. 45, no. 5, September-October 2016
2016-09-01
standard federal assistance awards. These contractors might be small, startup technology firms supported by venture capital, leading-edge technology...to provide effective contract oversight and present an accurate picture of contractor performance to the procuring contracting office. Lesson...mission footprints encompass a great deal of contractor activity, leadership that is not regularly engaged with the acquisition team often gives
Annual program analysis of the NASA Space Life Sciences Research and Education Support Program
NASA Technical Reports Server (NTRS)
1994-01-01
The basic objectives of this contract are to stimulate, encourage, and assist research and education in NASA life sciences. Scientists and experts from a number of academic and research institutions in this country and abroad are recruited to support NASA's need to find a solution to human physiological problems associated with living and working in space and on extraterrestrial bodies in the solar system. To fulfill the contract objectives, a cadre of staff and visiting scientists, consultants, experts, and subcontractors has been assembled into a unique organization dedicated to the space life sciences. This organization, USRA's Division of Space Life Sciences, provides an academic atmosphere, provides an organizational focal point for science and educational activities, and serves as a forum for the participation of eminent scientists in the biomedical programs of NASA. The purpose of this report is to demonstrate adherence to the requirement of Contract NAS9-18440 for a written review and analysis of the productivity and success of the program. In addition, this report makes recommendations for future activities and conditions to further enhance the objectives of the program and provides a self-assessment of the cost performance of the contract.
Contracting with outpatient hemodialysis patients to improve adherence to treatment.
Laidlaw, J K; Beeken, J E; Whitney, F W; Reyes, A A
1999-02-01
The purpose of this study was to examine the relationship between contingency contracting and adherence to prescribed therapy in outpatient chronic hemodialysis patients. A quasi-experimental, pretest/posttest design was used. The sample included 15 hemodialysis patients, 6 in the phosphorus group and 9 in the weight-gain group. The study was conducted at an outpatient hemodialysis center in a Midwestern rural state. Specific variables investigated were interdialytic weight gains and serum phosphorus levels that reflect adherence to fluid restrictions and to taking phosphate-binding medications. Weekly interviews were conducted with each patient and content analysis of interview data was completed to identify categories related to adherence and nonadherence. Pre- and postcontract weight gains and phosphorus levels were analyzed with a paired two sample t-test. The categories related to adherence and nonadherence included physiological, psychological, environmental, locus of control/self-control/self-praise, economical, medical, knowledge deficit, health benefits, family support, and social support. Adherence to taking phosphate-binding medication responded more favorably to contingency contracting than did adherence to fluid restrictions. Chronic outpatient hemodialysis patients in the sample responded to the use of contingency contracting and developed techniques to remember to take phosphate-binding medications in order to lower serum phosphorus medications.
SEAS (Surveillance Environmental Acoustic Support Program) Support
1984-02-29
ASEPS software - Provide support for AMES - Support for OUTPOST CREOLE, BIG DIPPER and MFA , First, a summary of the tasks as delineated in the contract...addition, the contractor will provide an engineer/scientist to support the BIG DIPPER data processing activities at NOSC. Task 3: SEAS Inventory - The...SI to provide support to SEAS for the OUTPOST -’ CREOLE III exercise which followed immediately after the BIG DIPPER .. exercise. OUTPOST CREOLE III
Weather forecasting support for AASE-2
NASA Technical Reports Server (NTRS)
Forbes, Gregory S.
1992-01-01
The AFEAS Contract and NASA Grant were awarded to Penn State in order to obtain real-time weather forecasting support for the NASA AASE-II Project, which was conducted between October 1991 and March 1992. Because of the special weather sensitivities of the NASA ER-2 aircraft, AASE-II planners felt that public weather forecasts issued by the National Weather Service would not be adequate for mission planning purposes. A likely consequence of resorting to that medium would have been that scientists would have had to be at work by 4 AM day after day in the hope that the aircraft could fly, only to be frustrated by a great number of 'scrubbed' missions. Thus, the Pennsylvania State University was contracted to provide real-time weather support to the AASE-II mission.
Reflex muscle contraction in anterior shoulder instability.
Wallace, D A; Beard, D J; Gill, R H; Eng, B; Carr, A J
1997-01-01
Reduced proprioception may contribute to recurrent anterior shoulder instability. Twelve patients with unilateral shoulder instability were investigated for evidence of deficient proprioception with an activated pneumatic cylinder and surface electromyography electrodes; the contralateral normal shoulder was used as a control. The latency between onset of movement and the detection of muscle contraction was used as an index of proprioception. No significant difference in muscle contraction latency was detected between the stable and unstable shoulders, suggesting that there was no significant defect in muscular reflex activity. This study does not support the use proprioception-enhancing physiotherapy in the treatment of posttraumatic anterior shoulder instability.
NASA Awards Chandra X-Ray Observatory Follow-On Contract
NASA Astrophysics Data System (ADS)
2003-08-01
NASA has awarded a contract to the Smithsonian Astrophysical Observatory in Cambridge, Mass., to provide science and operational support for the Chandra X-ray Observatory, one of the world's most powerful tools to better understand the structure and evolution of the universe. The contract will have a period of performance from August 31, 2003, through July 31, 2010, with an estimated value of 373 million. It is a follow-on contract to the existing contract with Smithsonian Astrophysical Observatory that has provided science and operations support to the Observatory since its launch in July 1999. At launch the intended mission life was five years. As a result of Chandra's success, NASA extended the mission from five to 10 years. The value of the original contract was 289 million. The follow-on contract with the Smithsonian Astrophysical Observatory will continue through the 10-year mission. The contract type is cost reimbursement with no fee. The contract covers mission operations and data analysis, which includes the observatory operations, science data processing and the general and guaranteed time observer (astronomer) support. The observatory operations tasks include monitoring the health and status of the observatory and developing and up linking the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning, and coordination of science observations with the general observers and processing and delivery of the resulting scientific data. There are approximately 200 to 250 observing proposals selected annually out of about 800 submitted, with a total amount of observing time of about 20 million seconds. Chandra has exceeded expectations of scientists, giving them unique insight into phenomena light years away, such as exotic celestial objects, matter falling into black holes, and stellar explosions. X-ray astronomy can only be performed from space because Earth's atmosphere blocks X-rays from reaching the surface. The Chandra Observatory travels one-third of the way to the moon during its orbit around the Earth every 64 hours. At its highest point, Chandra's highly elliptical, or egg- shaped, orbit is 200 times higher than that of its visible- light-gathering sister, the Hubble Space Telescope. NASA's Marshall Space Flight Center, Huntsville, Ala., manages the Chandra program for the Office of Space Science, NASA Headquarters, Washington. Northrop Grumman of Redondo Beach, Calif., formerly TRW, Inc., was the prime development contractor for the observatory. The Smithsonian Astrophysical Observatory controls science and flight operations from the Chandra X-ray Center in Cambridge, Mass. For information about NASA on the Internet, visit: http://www.nasa.gov For information about the Chandra X-ray Observatory on the Internet, visit: http://chandra.harvard.edu and http://chandra.nasa.gov
Design-Build Process for the Research Support Facility (RSF) (Book)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2012-06-01
An in-depth look at how the U.S. DOE and NREL used a performance-based design-build contract to build the Research Support Facility (RSF); one of the most energy efficient office buildings in the world.
Crash testing of Louisiana's multi-directional, single steel post, small sign support.
DOT National Transportation Integrated Search
1992-06-01
The Louisiana Department of Transportation and Development (LDOTD) contracted with the Texas Transportation Institute (TTI) to evaluate the impact characteristics of Louisiana's multi-directional 5 inch diameter steel post, small sign support when im...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... 800-877-8339. SUPPLEMENTARY INFORMATION: The Section 202 Supportive Housing for the Elderly Act of... projects assisted under HUD's Section 202 Supportive Housing for the Elderly program in the case of...
AHMCT Intelligent Roadway Information System (IRIS) technical support and testing
DOT National Transportation Integrated Search
2011-12-31
This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...
AHMCT Intelligent Roadway Information System (IRIS) technical support and testing.
DOT National Transportation Integrated Search
2011-12-01
This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...
77 FR 53923 - Notice of Permits Issued Under the Antarctic Conservation Act of 1978
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
... civilian support contractor, Lockheed Martin, Antarctic Support Contract took over on April 1, 2012... No. 2011-013 Permit No. 2011-014 Permit No. 2011-015 Lockheed Martin has been issued some permits to...
Dynamic Resectorization and Coordination Technology: An Evaluation of Air Traffic Control Complexity
NASA Technical Reports Server (NTRS)
Brinton, Christopher R.
1996-01-01
The work described in this report is done under contract with the National Aeronautics and Space Administration (NASA) to support the Advanced Air Transportation Technology (AATR) program. The goal of this program is to contribute to and accelerate progress in Advanced Air Transportation Technologies. Wyndemere Incorporated is supporting this goal by studying the complexity of the Air Traffic Specialist's role in maintaining the safety of the Air Transportation system. It is envisioned that the implementation of Free Flight may significantly increase the complexity and difficulty of maintaining this safety. Wyndemere Incorporated is researching potential methods to reduce this complexity. This is the final report for the contract.
Chim, Chor Sang; Sim, Joycelyn; Tam, Sidney; Tse, Eric; Lie, Albert Kwok Wai; Kwong, Yok Lam
2015-04-01
Serum lactate dehydrogenase (LDH) has been an adverse prognostic factor for myeloma but does not feature in the International Staging System (ISS). We examined whether elevated serum LDH at diagnosis remains an adverse risk factor independent of ISS for survivals transplant-eligible myeloma patients receiving early/frontline bortezomib-based induction, followed by autologous stem cell transplantation (ASCT). Seventy-seven transplant-eligible Chinese patients received three induction regimens [staged approach (N = 25), PAD (N = 19), VTD (N = 33)], followed by ASCT and thalidomide maintenance. Five-year overall (OS) and event-free (EFS) survivals were 66.4% and 36.2%. There was no difference in demographics, complete remission/near complete remission (CR/nCR rates postinduction or ASCT, and survivals among patients induced by the three induction regimens. Elevated LDH was associated with male gender (P = 0.006), ISS III (P = 0.042) and serum β2-microglobulin (P = 0.040). Univariate analysis showed that elevated LDH, ISS III, high β2-microglobulin, and failure to attain CR/nCR post-ACST were risk factors adversely impacting both OS and EFS. Multivariate analysis showed that elevated LDH was the only factor impacting both OS (P = 0.007) and EFS (P = 0.008). In this uniformly treated cohort of transplant-eligible myeloma patients, elevated serum LDH is an adverse risk factor independent of ISS for both OS and EFS. Bortezomib-based induction/ASCT regimen had not abolished the adverse impact of elevated LDH. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
ERIC Educational Resources Information Center
Chou, Rita Jing-Ann
2011-01-01
China has the largest aging population in the world today. Despite the Chinese tradition of filial piety, economic, social, cultural, and familial changes have made it increasingly difficult for older Chinese to receive support from adult children. To ensure parental support, the Family Support Agreement (FSA) emerged from a local community in the…
41 CFR 302-17.10 - Claims for payment and supporting documentation and verification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... supporting documentation and verification. 302-17.10 Section 302-17.10 Public Contracts and Property... INCOME TAX (RIT) ALLOWANCE § 302-17.10 Claims for payment and supporting documentation and verification..., net earnings (or loss) from self-employment income shown on attached Schedule SE (Form 1040): Form(s)W...
10 CFR 603.300 - Difference between an expenditure-based and a fixed-support TIA.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Difference between an expenditure-based and a fixed-support TIA. 603.300 Section 603.300 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS... Agreements § 603.300 Difference between an expenditure-based and a fixed-support TIA. The contracting officer...
YFa and analogs: Investigation of opioid receptors in smooth muscle contraction
Kumar, Krishan; Goyal, Ritika; Mudgal, Annu; Mohan, Anita; Pasha, Santosh
2011-01-01
AIM: To study the pharmacological profile and inhibition of smooth muscle contraction by YFa and its analogs in conjunction with their receptor selectivity. METHODS: The effects of YFa and its analogs (D-Ala2) YFa, Y (D-Ala2) GFMKKKFMRF amide and Des-Phe-YGGFMKKKFMR amide in guinea pig ileum (GPI) and mouse vas deferens (MVD) motility were studied using an isolated tissue organ bath system, and morphine and DynA (1-13) served as controls. Acetylcholine was used for muscle stimulation. The observations were validated by specific antagonist pretreatment experiments using naloxonazine, naltrindole and norbinaltorphimine norBNI. RESULTS: YFa did not demonstrate significant inhibition of GPI muscle contraction as compared with morphine (15% vs 62%, P = 0.0002), but moderate inhibition of MVD muscle contraction, indicating the role of κ opioid receptors in the contraction. A moderate inhibition of GPI muscles by (Des-Phe) YFa revealed the role of anti-opiate receptors in the smooth muscle contraction. (D-Ala-2) YFa showed significant inhibition of smooth muscle contraction, indicating the involvement of mainly δ receptors in MVD contraction. These results were supported by specific antagonist pretreatment assays. CONCLUSION: YFa revealed its side-effect-free analgesic properties with regard to arrest of gastrointestinal transit. The study provides evidences for the involvement of κ and anti-opioid receptors in smooth muscle contraction. PMID:22110284
1983-09-01
Ciencia y Tecnologia -Mexico, by ONR under Contract No. N00014-77-C-0675, and by ARO under Contract No. DAAG29-80-K-0042. LUJ THE VIE~W, rTIJ. ’~v ’’~c...Department of Statis- tics. For financial support I thank the Consejo Nacional de Ciencia y Tecnologia - Mexico, and the Department of Statistics of the
RFP Patterns and Techniques for Successful Agile Contracting
2016-11-01
2016-SR-025 SOFTWARE ENGINEERING INSTITUTE | CARNEGIE MELLON UNIVERSITY [Distribution Statement A] This material has been approved for public...release and unlimited distribution. Please see Copyright notice for non-U.S. Government use and distribution. Copyright 2016 Carnegie Mellon University...This material is based upon work funded and supported by the Department of Defense under Contract No. FA8721-05-C-0003 with Carnegie Mellon
Oil Pharmacy at the Thermal Protection System Facility
2017-08-08
An overall view of the Oil Pharmacy operated under the Test and Operations Support Contract, or TOSC. The facility consolidated storage and distribution of petroleum products used in equipment maintained under the contract. This included standardized naming, testing processes and provided a central location for distribution of oils used in everything from simple machinery to the crawler-transporter and cranes in the Vehicle Assembly Building.
ERIC Educational Resources Information Center
Temkin, Deborah; Horton, Susannah; Kim, Audrey
2014-01-01
The Robert F. Kennedy Center for Justice and Human Rights' bullying prevention initiative, RFK Project SEATBELT (RFKC) was contracted by the DC Office of Human Rights (OHR), in June 2013, to provide resources and support for DC public and public charter schools' bullying prevention efforts. This contract moved to Child Trends in August 2014. From…
Joint Forces Command - United Assistance Fiscal Triad
2016-05-17
Division G–8, the 922nd Contracting Battalion (CBN), and C Detachment, 101st Financial Management Support Unit (C/101st FMSU) all deployed from Fort...Campbell, Kentucky, to resource OUA. This “fiscal triad” of resource management , contingency contracting, and financial operations units funded...of De- fense (DOD) operations to come in under budget , under the anticipated time, and with less manpower than initially requested. Planning and
Holistic Contract Administration in Army Forces Abroad
2016-10-01
Defense (DoD) civil- ian personnel—i.e., 1910 Quality Assurance Specialist, 1102 Contract Specialist, and 1103 Industrial Property Management Specialist... 1103 -series civilian property ad- ministrators throughout ACC, the battalion experienced diffi- culties hiring for these positions during its deployment...tasks. Counting on 1103 support, ACOs received minimal property training prior to deploy- ment. This proved to be a major setback as ACOs struggled
It Is Time to Cancel Medicine's Social Contract Metaphor.
Harris, John M
2017-09-01
There is agreement that the complex relationship between medicine and society is best described as a metaphorical social contract and that professionalism is the medical profession's contribution to this contract. Metaphors can help clarify abstract concepts, but they can also be abused if the counterfactual attributes of a metaphor become attributed to its subject. This seems to be happening with medical professionalism, which has sometimes been reduced to a contracted deliverable and a bargaining chip. The undesirable attributes of the social contract metaphor may be hindering efforts to understand and teach medical professionalism.Despite its theoretical weaknesses, the social contract metaphor has historical credibility because of its alleged association with the 1847 Code of Medical Ethics and the subsequent ascension of regular (allopathic) medicine in the early 20th century. However, the record does not support an argument that the intended purpose of the 1847 Code was to create a social contract or that one ever arose. The alternative account that a contract did arise, but physicians were poor partners, is neither satisfying nor explanatory.As now used, medicine's social contract metaphor has serious theoretical and historic weaknesses. Medical educators should remove this narrow and overworked metaphor from their discussions of professionalism. By doing this, educators and the profession in general would only lose the ability to threaten themselves with the cancellation of their social contract. In return they would open the door to a more complex and fruitful consideration of medical professionalism and medicine's relationship with society.
23 CFR 230.119 - Monitoring of supportive services.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Monitoring of supportive services. 230.119 Section 230.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Equal Employment Opportunity on Federal and Federal-Aid Construction Contracts (Including...
23 CFR 230.119 - Monitoring of supportive services.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Monitoring of supportive services. 230.119 Section 230.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Equal Employment Opportunity on Federal and Federal-Aid Construction Contracts (Including...
23 CFR 230.119 - Monitoring of supportive services.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Monitoring of supportive services. 230.119 Section 230.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Equal Employment Opportunity on Federal and Federal-Aid Construction Contracts (Including...
23 CFR 230.119 - Monitoring of supportive services.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Monitoring of supportive services. 230.119 Section 230.119 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Equal Employment Opportunity on Federal and Federal-Aid Construction Contracts (Including...
A robot control architecture supported on contraction theory
NASA Astrophysics Data System (ADS)
Silva, Jorge; Sequeira, João; Santos, Cristina
2017-01-01
This paper proposes fundamentals for stability and success of a global system composed by a mobile robot, a real environment and a navigation architecture with time constraints. Contraction theory is a typical framework that provides tools and properties to prove the stability and convergence of the global system to a unique fixed point that identifies the mission success. A stability indicator based on the combination contraction property is developed to identify the mission success as a stability measure. The architecture is fully designed through C1 nonlinear dynamical systems and feedthrough maps, which makes it amenable for contraction analysis. Experiments in a realistic and uncontrolled environment are realised to verify if inherent perturbations of the sensory information and of the environment affect the stability and success of the global system.
Health Insurance as a Two-Part Pricing Contract *
Lakdawalla, Darius; Sood, Neeraj
2013-01-01
Monopolies appear throughout health care. We show that health insurance operates like a conventional two-part pricing contract that allows monopolists to extract profits without inefficiently constraining quantity. When insurers are free to offer a range of insurance contracts to different consumer types, health insurance markets perfectly eliminate deadweight losses from upstream health care monopolies. Frictions limiting the sorting of different consumer types into different insurance contracts restore some of these upstream monopoly losses, which manifest as higher rates of uninsurance, rather than as restrictions in quantity utilized by insured consumers. Empirical analysis of pharmaceutical patent expiration supports the prediction that heavily insured markets experience little or no efficiency loss under monopoly, while less insured markets exhibit behavior more consistent with the standard theory of monopoly. PMID:23997354
Electrically contractile polymers augment right ventricular output in the heart.
Ruhparwar, Arjang; Piontek, Patricia; Ungerer, Matthias; Ghodsizad, Ali; Partovi, Sasan; Foroughi, Javad; Szabo, Gabor; Farag, Mina; Karck, Matthias; Spinks, Geoffrey M; Kim, Seon Jeong
2014-12-01
Research into the development of artificial heart muscle has been limited to assembly of stem cell-derived cardiomyocytes seeded around a matrix, while nonbiological approaches to tissue engineering have rarely been explored. The aim of the study was to apply electrically contractile polymer-based actuators as cardiomyoplasty for positive inotropic support of the right ventricle. Complex trilayer polypyrrole (PPy) bending polymers for high-speed applications were generated. Bending motion occurred directly as a result of electrochemically driven charging and discharging of the PPy layers. In a rat model (n = 5), strips of polymers (3 × 20 mm) were attached and wrapped around the right ventricle (RV). RV pressure was continuously monitored invasively by direct RV cannulation. Electrical activation occurred simultaneously with either diastole (in order to evaluate the polymer's stand-alone contraction capacity; group 1) or systole (group 2). In group 1, the pressure generation capacity of the polymers was measured by determining the area under the pressure curve (area under curve, AUC). In group 2, the RV pressure AUC was measured in complexes directly preceding those with polymer contraction and compared to RV pressure complexes with simultaneous polymer contraction. In group 1, the AUC generated by polymer contraction was 2768 ± 875 U. In group 2, concomitant polymer contraction significantly increased AUC compared with complexes without polymer support (5987 ± 1334 U vs. 4318 ± 691 U, P ≤ 0.01). Electrically contractile polymers are able to significantly augment right ventricular contraction. This approach may open new perspectives for myocardial tissue engineering, possibly in combination with fetal or embryonic stem cell-derived cardiomyocytes. Copyright © 2014 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.
Slean, Meghan M.; Panigrahi, Gagan B.; Castel, Arturo López; Pearson, August B.; Tomkinson, Alan E.; Pearson, Christopher E.
2016-01-01
Typically disease-causing CAG/CTG repeats expand, but rare affected families can display high levels of contraction of the expanded repeat amongst offspring. Understanding instability is important since arresting expansions or enhancing contractions could be clinically beneficial. The MutSβ mismatch repair complex is required for CAG/CTG expansions in mice and patients. Oddly, by unknown mechanisms MutSβ-deficient mice incur contractions instead of expansions. Replication using CTG or CAG as the lagging strand template is known to cause contractions or expansions respectively; however, the interplay between replication and repair leading to this instability remains unclear. Towards understanding how repeat contractions may arise, we performed in vitro SV40-mediated replication of repeat-containing plasmids in the presence or absence of mismatch repair. Specifically, we separated repair from replication: Replication mediated by MutSβ- and MutSα-deficient human cells or cell extracts produced slipped-DNA heteroduplexes in the contraction- but not expansion-biased replication direction. Replication in the presence of MutSβ disfavoured the retention of replication products harbouring slipped-DNA heteroduplexes. Post-replication repair of slipped-DNAs by MutSβ-proficient extracts eliminated slipped-DNAs. Thus, a MutSβ-deficiency likely enhances repeat contractions because MutSβ protects against contractions by repairing template strand slip-outs. Replication deficient in LigaseI or PCNA-interaction mutant LigaseI revealed slipped-DNA formation at lagging strands. Our results reveal that distinct mechanisms lead to expansions or contractions and support inhibition of MutSβ as a therapeutic strategy to enhance the contraction of expanded repeats. PMID:27155933
Rodwell, John; Gulyas, Andre
2013-12-01
To explore affective and attitudinal outcomes of aspects of the psychological contract, organizational justice and negative affectivity in nursing. Job satisfaction, mental health and commitment to organizations and the nursing profession is important for nurse retention. The psychological contract and organizational justice are related constructs that have been linked to these outcomes, as has the characteristic of negative affectivity. Rarely have the relationships between these concepts and outcomes been examined. Cross-sectional data were collected during November, 2007. Survey data collected on Registered Nurses and midwives from a large metropolitan hospital in Australia (n = 193, after removing missing cases and outliers) were analysed using structural equation modelling. The model used self-report measures of psychological contract obligations, fulfilment and breach, organizational justice and negative affectivity as predictors of job satisfaction, organizational commitment, career commitment and psychological distress. Goodness-of-fit statistics confirmed a well-fitting model. The model explained 49%, 29%, 60% and 47% of the variance in psychological distress, job satisfaction, organizational commitment and career commitment respectively. Findings support the influence of the psychological contract, fairness and individual differences on outcomes important to nurse retention. Keeping promises is more important than making promises that cannot be kept. The results support a discrepancy mechanism underlying fulfilment and breach. The impact of breach suggests that nurses take breach personally, whereas fulfilment may represent a global evaluation of discrepancies. Ultimately, fulfilling, rather than making promises, keeps nurses happy. © 2013 John Wiley & Sons Ltd.
Forder, J; Netten, A
2000-10-01
A variety of contract types are used in the placement of elderly people in residential and nursing care homes in the UK. Contracts vary according to how and when providers are paid. Among other things, prices can be made contingent on the total quantity of service to be purchased and on production cost characteristics. They can be determined at the time of placement or in advance. The primary objective of this paper is to assess the impact of contract choices on the price of placements. Regression analysis was conducted on a final sample of 1780 publicly funded placements made in 18 local authorities in the UK over a 6-month period ending in early 1996. Controlling factors included in the price analysis were production cost indicators and those measuring market competitiveness. Choices of both quantity and cost contingent contracts were found to be significantly associated with placement prices. The findings support the hypothesis that contract payment arrangements have different risk, insurance and information properties, and so have implications for the performance of residential care providers.
Mass transfer effect of the stalk contraction-relaxation cycle of Vorticella convallaria
NASA Astrophysics Data System (ADS)
Zhou, Jiazhong; Admiraal, David; Ryu, Sangjin
2014-11-01
Vorticella convallaria is a genus of protozoa living in freshwater. Its stalk contracts and coil pulling the cell body towards the substrate at a remarkable speed, and then relaxes to its extended state much more slowly than the contraction. However, the reason for Vorticella's stalk contraction is still unknown. It is presumed that water flow induced by the stalk contraction-relaxation cycle may augment mass transfer near the substrate. We investigated this hypothesis using an experimental model with particle tracking velocimetry and a computational fluid dynamics model. In both approaches, Vorticella was modeled as a solid sphere translating perpendicular to a solid surface in water. After having been validated by the experimental model and verified by grid convergence index test, the computational model simulated water flow during the cycle based on the measured time course of stalk length changes of Vorticella. Based on the simulated flow field, we calculated trajectories of particles near the model Vorticella, and then evaluated the mass transfer effect of Vorticella's stalk contraction based on the particles' motion. We acknowlege support from Laymann Seed Grant of the University of Nebraska-Lincoln.
Rahe-Meyer, Niels; Pawlak, Matthias; Weilbach, Christian; Osthaus, Wilhelm Alexander; Ruhschulte, Hainer; Solomon, Cristina; Piepenbrock, Siegfried; Winterhalter, Michael
2008-01-01
Background The devices used for in vivo examination of muscle contractions assess only pure force contractions and the so-called isokinetic contractions. In isokinetic experiments, the extremity and its muscle are artificially moved with constant velocity by the measuring device, while a tetanic contraction is induced in the muscle, either by electrical stimulation or by maximal voluntary activation. With these systems, experiments cannot be performed at pre-defined, constant muscle length, single contractions cannot be evaluated individually and the separate examination of the isometric and the isotonic components of single contractions is not possible. Methods The myograph presented in our study has two newly developed technical units, i.e. a). a counterforce unit which can load the muscle with an adjustable, but constant force and b). a length-adjusting unit which allows for both the stretching and the contraction length to be infinitely adjustable independently of one another. The two units support the examination of complex types of contraction and store the counterforce and length-adjusting settings, so that these conditions may be accurately reapplied in later sessions. Results The measurement examples presented show that the muscle can be brought to every possible pre-stretching length and that single isotonic or complex isometric-isotonic contractions may be performed at every length. The applied forces act during different phases of contraction, resulting into different pre- and after-loads that can be kept constant – uninfluenced by the contraction. Maximal values for force, shortening, velocity and work may be obtained for individual muscles. This offers the possibility to obtain information on the muscle status and to monitor its changes under non-invasive measurement conditions. Conclusion With the Complex Myograph, the whole spectrum of a muscle's mechanical characteristics may be assessed. PMID:18616815
USAF/SCEEE Graduate Student Summer Support Program (1982). Management and Technical Report.
1982-10-01
AD-A130 767 USAF/SCEEE GRADUATE STUDENT SUMMER SUPPORT PROGRAM (1982) MANAGEMENT AND..(U) SOUTHEASTERN CENTER FORELECTRICAL ENGINEERING EDUCATION INC...SUMMER SUPPORT PROGRAM Conducted by Southeastern Center for Electrical Engineering Education under USAF Contract Number F49620-82-C-0035 MANAGEMENT ...UNITED STATES AIR FORCE GRADUATE STUDENT SL24MER SUPPORT PROGRAM 1982 PROGRAM MANAGEMENT AND TECHNICAL REPORT SOUTHEASTERN CENTER FOR ELECTRICAL
24 CFR 886.308 - Maximum total annual contract commitment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... OF HOUSING AND URBAN DEVELOPMENT (SECTION 8 HOUSING ASSISTANCE PROGRAMS, SECTION 202 DIRECT LOAN PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-SPECIAL ALLOCATIONS...
24 CFR 886.308 - Maximum total annual contract commitment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF HOUSING AND URBAN DEVELOPMENT (SECTION 8 HOUSING ASSISTANCE PROGRAMS, SECTION 202 DIRECT LOAN PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-SPECIAL ALLOCATIONS...
48 CFR 37.114 - Special acquisition requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... attention to ensure that they do not result in performance of inherently governmental functions by the... those that involve support of government policy or decision making. During performance of service... contracting for functions that are not inherently governmental but closely support the performance of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Authorities (DSCA). Support provided by U.S. Federal military forces, DoD civilians, DoD contract personnel... support to those authorities. Emergency Authority. A Federal military commander's authority, in.... Immediate Response Authority. A Federal military commander's, DoD Component Head's, and/or responsible DoD...
ISS Logistics Hardware Disposition and Metrics Validation
NASA Technical Reports Server (NTRS)
Rogers, Toneka R.
2010-01-01
I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.
20 CFR 645.215 - What must a WtW operating entity that serves noncustodial parent participants do?
Code of Federal Regulations, 2011 CFR
2011-04-01
... responsibility contracts: (1) Take into account the employment and child support status of the noncustodial... commitment by the noncustodial parent to cooperate in the payment of child support for the minor child. This... related activities that will enable the noncustodial parent to make regular child support payments. For...
20 CFR 645.215 - What must a WtW operating entity that serves noncustodial parent participants do?
Code of Federal Regulations, 2013 CFR
2013-04-01
... responsibility contracts: (1) Take into account the employment and child support status of the noncustodial... commitment by the noncustodial parent to cooperate in the payment of child support for the minor child. This... related activities that will enable the noncustodial parent to make regular child support payments. For...
20 CFR 645.215 - What must a WtW operating entity that serves noncustodial parent participants do?
Code of Federal Regulations, 2012 CFR
2012-04-01
... responsibility contracts: (1) Take into account the employment and child support status of the noncustodial... commitment by the noncustodial parent to cooperate in the payment of child support for the minor child. This... related activities that will enable the noncustodial parent to make regular child support payments. For...
20 CFR 645.215 - What must a WtW operating entity that serves noncustodial parent participants do?
Code of Federal Regulations, 2014 CFR
2014-04-01
... responsibility contracts: (1) Take into account the employment and child support status of the noncustodial... commitment by the noncustodial parent to cooperate in the payment of child support for the minor child. This... related activities that will enable the noncustodial parent to make regular child support payments. For...
Disaster Preparedness Planning and Facility Contingency Operations for Public Works
1993-01-01
Forces Reporting Disaster Preparedness and Logistical Support 20-37 General Concept Manpower Planning, Protection and Support Personal Protection...their military mission, economical importance, geographical location, and personal and public safety. The organization, preparedness plans and facility...for emergency medical support). (5) Issue personal protective gear and equipment, if necessary. (6) Determine existi- g contract outcome. All
Willging, Cathleen E; Aarons, Gregory A; Trott, Elise M; Green, Amy E; Finn, Natalie; Ehrhart, Mark G; Hecht, Debra B
2016-09-01
Sustainment of evidence-based interventions (EBIs) in human services depends on the inner context of community-based organizations (CBOs) that provide services and the outer context of their broader environment. Increasingly, public officials are experimenting with contracting models from for-profit industries to procure human services. In this case study, we conducted qualitative interviews with key government and CBO stakeholders to examine implementation of the Best Value-Performance Information Procurement System to contract for EBIs in a child welfare system. Findings suggest that stakeholder relationships may be compromised when procurement disregards local knowledge, communication, collaboration, and other factors supporting EBIs and public health initiatives.
Fiscal Year 2014: Comprehensive Oversight Plan for Southwest Asia
2013-09-30
rule of law. We plan to focus primarily on DOS Bureau of International Narcotics and Law Enforcement (INL) Justice Sector Support Program ( JSSP ...Specifically, (1) assess whether JSSP contractor(s) provided qualified trainers and services in accordance with the terms of the contract(s); (2...and USAID justice sector training efforts and determine the extent to which these programs complement the JSSP . (Project: SIGAR-073A) Dec-12 Oct-13
Checklist and Decision Support in Nutritional Care for Burned Patients
2014-10-01
in Nutritional Care for Burned Patients PRINCIPAL INVESTIGATOR: Steven E. Wolf, MD CONTRACTING ORGANIZATION: REPORT DATE... Nutritional Care for Burned Patients 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Steven E Wolf, MD Betty Diamond...Study/Product Aim(s) were as follows: 1) To determine under what conditions compliance with nutritional goals are not met in severely burned adults, 2
Technical support plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The PassPort (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, and Purchasing. The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources, Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HAND1 2000 Project, is referred to asmore » Business Management System (BMS) and Chemical Management.« less
Evaluating alternative service contracts for medical equipment.
De Vivo, L; Derrico, P; Tomaiuolo, D; Capussotto, C; Reali, A
2004-01-01
Managing medical equipments is a formidable task that has to be pursued maximizing the benefits within a highly regulated and cost-constrained environment. Clinical engineers are uniquely equipped to determine which policies are the most efficacious and cost effective for a health care institution to ensure that medical devices meet appropriate standards of safety, quality and performance. Part of this support is a strategy for preventive and corrective maintenance. This paper describes an alternative scheme of OEM (Original Equipment Manufacturer) service contract for medical equipment that combines manufacturers' technical support and in-house maintenance. An efficient and efficacious organization can reduce the high cost of medical equipment maintenance while raising reliability and quality. Methodology and results are discussed.
2013-01-17
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, Jacobs Technology General Manager Andy Allen speaks at a town hall meeting providing attendees an opportunity to learn about the Test and Operations Support Contract, or TOSC, hiring process and to introduce the organization's management team. NASA recently awarded its TOSC contract to Jacobs Technology Inc. of Tullahoma, Tenn. Jacobs will provide overall management and implementation of ground systems capabilities, flight hardware processing and launch operations at Kennedy. These tasks will support the International Space Station, Ground Systems Development and Operations, and the Space Launch System, Orion Multi-Purpose Crew Vehicle and Launch Services programs. For more information, visit http://www.nasa.gov/centers/kennedy/news/tosc_awarded.html Photo credit: NASA/Dimitri Gerondidakis
LBP based detection of intestinal motility in WCE images
NASA Astrophysics Data System (ADS)
Gallo, Giovanni; Granata, Eliana
2011-03-01
In this research study, a system to support medical analysis of intestinal contractions by processing WCE images is presented. Small intestine contractions are among the motility patterns which reveal many gastrointestinal disorders, such as functional dyspepsia, paralytic ileus, irritable bowel syndrome, bacterial overgrowth. The images have been obtained using the Wireless Capsule Endoscopy (WCE) technique, a patented, video colorimaging disposable capsule. Manual annotation of contractions is an elaborating task, since the recording device of the capsule stores about 50,000 images and contractions might represent only the 1% of the whole video. In this paper we propose the use of Local Binary Pattern (LBP) combined with the powerful textons statistics to find the frames of the video related to contractions. We achieve a sensitivity of about 80% and a specificity of about 99%. The achieved high detection accuracy of the proposed system has provided thus an indication that such intelligent schemes could be used as a supplementary diagnostic tool in endoscopy.
Scientific Data Analysis and Software Support: Geodynamics
NASA Technical Reports Server (NTRS)
Klosko, Steven; Sanchez, B. (Technical Monitor)
2000-01-01
The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.
Summary of NASA Support of the F-111 Development Program. Part 1; December 1962 - December 1965
NASA Technical Reports Server (NTRS)
1966-01-01
The F-111 is a biservice, multimission, tactical aircraft being developed for the Air Force and Navy by General Dynamics and Grumman. The general arrangement of the F-111 is shown in figure 1. This aircraft, through the use of the "variable sweep wing" concept, offers the possibility of combining a wide range of mission capabilities into a single aircraft. The F-111 is a direct outgrowth of the Langley Research Center's variable sweep research which began in 1947. The early research culminated in the X-5 variable sweep research airplane which demonstrated the advantage and feasibility of in-flight sweep variation The X-5 utilized the translating wing concept to offset the longitudinal stability variation with sweep changes. Later Langley research beginning in 1958 resulted in the "outboard pivot" concept which eliminated the need for wing translation and led .to the TFX (F-111) concept. A chronology of the NACA/NASA variable sweep research effort and direct suport of the TFX up to the awarding of the contract to General Dynamics/Grumman on November 24, 1962, is presented in refer'ence 1. Since the awarding of the contract, the Langley, Ames, Lewis, and Flight Research Centers have been actively supporting the F-111 development program. Because of the strong NASA interest in this aircraft and the large magnitude of NASA support involved, it was felt desirable to document this support. The purpose of this paper therefore is to present a brief summary of the NASA support, in chronological order, through December 1965, beginning with the awarding of the contract in November 1962.
TRICARE Managed Care Support Contractor Program Integrity Units Met Contract Requirements
2012-12-05
these contractors because they represented 52 percent of purchased care claims paid in 20 ll for TRICARE beneficiaries. We did not review the dental ...5 (!ru-L..!J(It~ t’J Alice F. Carey Assistant Inspector General Readiness, Operations, and Support
DOT National Transportation Integrated Search
2010-08-31
This report presents the results of research activities conducted under Contract No. 519691-PIT 008 on Sensing Technology for : Damage Assessment of Sign Supports and Cantilever Poles between the University of Pittsburgh and the Pennsylvania De...
24 CFR 888.202 - Manner of publication.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND CONTRACT RENT ANNUAL... published as market conditions indicate. In the case of revised factors applicable only to specific areas...
76 FR 45542 - Procurement List; Proposed Addition
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... Feeding and Cleaning. NPA: NewView Oklahoma, Inc., Oklahoma City, OK. Contracting Activity: Defense Logistics Agency Troop Support, Philadelphia, PA. Coverage: C-List for 100% of the requirement of the Department of Defense, as aggregated by the Defense Logistics Agency Troop Support, Philadelphia, PA. Barry S...
10 CFR 950.2 - Scope and applicability.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS General Provisions § 950.2 Scope and applicability. This part sets forth the policies and procedures for the award and administration of Standby Support Contracts between the Department and sponsors of new advanced nuclear facilities. ...
Vasorelaxant effect of the analgesic clonixin on rat aorta.
Morales, M A; Silva, A; Brito, G; Bustamante, S; Ponce, H; Paeile, C
1995-03-01
1. A novel vasorelaxant effect of clonixinate of L-lysine (Clx), analgesic and anti-inflammatory, was studied in rat aortic rings. 2. Clx completely relaxed aortic rings contracted by KCl 70 mM and together with its analog flunixin exhibited lesser potency but equal efficacy than verapamil. In comparison, indomethacin, which is a more potent cyclo-oxygenase inhibitor relaxed only about 40% of the maximal contraction of aortic rings. 3. Furthermore, Clx antagonized Ca2+ dependent aortic contraction and BAY K-8644 induced aortic contraction suggesting its calcium antagonist character. 4. From these results it can be concluded that the hypotensive effect seen in rats in vivo after Clx i.v. injection arises because of vasodilatory effect of Clx and gives further support to the proposal that the pharmacological mechanism of action of Clx should be calcium antagonism.
Dinning, Phil G; Wiklendt, Lukasz; Omari, Taher; Arkwright, John W; Spencer, Nick J; Brookes, Simon J H; Costa, Marcello
2014-01-01
Propulsive contractions of circular muscle are largely responsible for the movements of content along the digestive tract. Mechanical and electrophysiological recordings of isolated colonic circular muscle have demonstrated that localized distension activates ascending and descending interneuronal pathways, evoking contraction orally and relaxation anally. These polarized enteric reflex pathways can theoretically be sequentially activated by the mechanical stimulation of the advancing contents. Here, we test the hypothesis that initiation and propagation of peristaltic contractions involves a neuromechanical loop; that is an initial gut distension activates local and oral reflex contraction and anal reflex relaxation, the subsequent movement of content then acts as new mechanical stimulus triggering sequentially reflex contractions/relaxations at each point of the gut resulting in a propulsive peristaltic contraction. In fluid filled isolated rabbit distal colon, we combined spatiotemporal mapping of gut diameter and intraluminal pressure with a new analytical method, allowing us to identify when and where active (neurally-driven) contraction or relaxation occurs. Our data indicate that gut dilation is associated with propagating peristaltic contractions, and that the associated level of dilation is greater than that preceding non-propagating contractions (2.7 ± 1.4 mm vs. 1.6 ± 1.2 mm; P < 0.0001). These propagating contractions lead to the formation of boluses that are propelled by oral active neurally driven contractions. The propelled boluses also activate neurally driven anal relaxations, in a diameter dependent manner. These data support the hypothesis that neural peristalsis is the consequence of the activation of a functional loop involving mechanical dilation which activates polarized enteric circuits. These produce propulsion of the bolus which activates further anally, polarized enteric circuits by distension, thus closing the neuromechanical loop.
Adenosine A1 receptors link to smooth muscle contraction via CYP4a, PKC-α, and ERK1/2
Kunduri, SS; Mustafa, SJ; Ponnoth, DS; Dick, GM; Nayeem, MA
2013-01-01
Adenosine A1 receptor (A1AR) activation contracts smooth muscle, although signaling mechanisms aren’t thoroughly understood. Activation of A1AR leads to metabolism of arachidonic acid, including the production of 20-hydroxyeicosatetraenoic acid (20-HETE) by cytochrome P4504a (CYP4a). 20-HETE can activate protein kinase C-α (PKC-α) which crosstalks with extracellular signal-regulated kinase (ERK1/2) pathway. Both these pathways can regulate smooth muscle contraction, we tested the hypothesis that A1AR contracts smooth muscle through a pathway involving CYP4a, PKC-α, and ERK1/2. Experiments included isometric tension recordings of aortic contraction and Western blots of signaling molecules in wild type (WT) and A1AR knockout (A1KO) mice. Contraction to the A1-selective agonist CCPA was absent in A1KO mice aortae, indicating the contractile role of A1AR. Inhibition of CYP4a (HET0016) abolished CCPA-induced contraction in WT aortae, indicating a critical role for 20-HETE. Both WT and A1KO mice aortae contracted in response to exogenous 20-HETE. Inhibition of PKC-α (Gö6976) or ERK1/2 (PD98059) attenuated 20-HETE-induced contraction equally, suggesting that ERK1/2 is downstream of PKC-α. Contractions to exogenous 20-HETE were significantly less in A1KO mice; reduced protein levels of PKC-α, p-ERK1/2, and total ERK1/2 supported this observation. Our data indicate that A1AR mediates smooth muscle contraction via CYP4a and a PKC-α-ERK1/2 pathway. PMID:23519140
Adenosine A1 receptors link to smooth muscle contraction via CYP4a, protein kinase C-α, and ERK1/2.
Kunduri, Swati S; Mustafa, S Jamal; Ponnoth, Dovenia S; Dick, Gregory M; Nayeem, Mohammed A
2013-07-01
Adenosine A1 receptor (A1AR) activation contracts smooth muscle, although signaling mechanisms are not thoroughly understood. Activation of A1AR leads to metabolism of arachidonic acid, including the production of 20-hydroxyeicosatetraenoic acid (20-HETE) by cytochrome P4504a (CYP4a). The 20-HETE can activate protein kinase C-α (PKC-α), which crosstalks with extracellular signal-regulated kinase (ERK1/2) pathway. Both these pathways can regulate smooth muscle contraction, we tested the hypothesis that A1AR contracts smooth muscle through a pathway involving CYP4a, PKC-α, and ERK1/2. Experiments included isometric tension recordings of aortic contraction and Western blots of signaling molecules in wild type (WT) and A1AR knockout (A1KO) mice. Contraction to the A1-selective agonist 2-chloro-N cyclopentyladenosine (CCPA) was absent in A1KO mice aortae, indicating the contractile role of A1AR. Inhibition of CYP4a (HET0016) abolished 2-chloro-N cyclopentyladenosine-induced contraction in WT aortae, indicating a critical role for 20-HETE. Both WT and A1KO mice aortae contracted in response to exogenous 20-HETE. Inhibition of PKC-α (Gö6976) or ERK1/2 (PD98059) attenuated 20-HETE-induced contraction equally, suggesting that ERK1/2 is downstream of PKC-α. Contractions to exogenous 20-HETE were significantly less in A1KO mice; reduced protein levels of PKC-α, p-ERK1/2, and total ERK1/2 supported this observation. Our data indicate that A1AR mediates smooth muscle contraction via CYP4a and a PKC-α-ERK1/2 pathway.
Defense AT and L. Volume 44, Number 3
2015-06-01
CommunityBrowser.aspx?id=527436 Product Support Key References https://acc.dau.mil/productsupport CLL 011 Performance-Based Life Cycle Product Support (PBL...http://icatalog.dau.mil/onlinecatalog/courses.aspx?crs_id=269 CLL 031 PBL Contracting Strategies http://icatalog.dau.mil/onlinecatalog/courses.aspx...CommunityBrowser.aspx?id=527436 Product Support Key References https://acc.dau.mil/productsupport CLL 011 Performance-Based Life Cycle Product Support (PBL) http
GPHS-RTGs in support of the Cassini Mission
NASA Astrophysics Data System (ADS)
1994-10-01
The progress on the radioisotope generators and ancillary activities is described. This report is organized by program task as follows: spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; design, reviews, and mission applications; project management, quality assurance and reliability, contract changes, non-capital CAGO acquisition, and CAGO maintenance; contractor acquired government owned property (CAGO) acquisition.
GPHS-RTGs in support of the Cassini mission
NASA Astrophysics Data System (ADS)
1992-04-01
The technical progress achieved during the period 30 Mar. - 27 Sep. 1992 is described. Topics covered include: spacecraft integration and liaison; engineering support; safety; qualified unicouple production, ETG fabrication, assembly, and test; ground support equipment; radioisotope thermoelectric generators (RTG) shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, non-capital contractor acquired government owned (CAGO) acquisitions, and CAGO maintenance; and CAGO acquisitions.
GNSS Wristwatch Device for Networked Operations Supporting Location Based Services
2008-09-01
Coordinates, Volume 4, Issue 9, Sep 2008 GNSS WRISTWATCH DEVICE FOR NETWORKED OPERATIONS SUPPORTING LOCATION BASED SERVICES Alison Brown...TITLE AND SUBTITLE GNSS Wristwatch Device for Networked Operations Supporting Location Based Services 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...LocatorNet Portal also supports Location Based Services (LBS) based on the TIDGET solution data using an Oracle Mapping Server with an open architecture
Domain-specific reasoning: social contracts, cheating, and perspective change.
Gigerenzer, G; Hug, K
1992-05-01
What counts as human rationality: reasoning processes that embody content-independent formal theories, such as propositional logic, or reasoning processes that are well designed for solving important adaptive problems? Most theories of human reasoning have been based on content-independent formal rationality, whereas adaptive reasoning, ecological or evolutionary, has been little explored. We elaborate and test an evolutionary approach. Cosmides' (1989) social contract theory, using the Wason selection task. In the first part, we disentangle the theoretical concept of a "social contract" from that of a "cheater-detection algorithm". We demonstrate that the fact that a rule is perceived as a social contract--or a conditional permission or obligation, as Cheng and Holyoak (1985) proposed--is not sufficient to elicit Cosmides' striking results, which we replicated. The crucial issue is not semantic (the meaning of the rule), but pragmatic: whether a person is cued into the perspective of a party who can be cheated. In the second part, we distinguish between social contracts with bilateral and unilateral cheating options. Perspective change in contracts with bilateral cheating options turns P & not-Q responses into not-P & Q responses. The results strongly support social contract theory, contradict availability theory, and cannot be accounted for by pragmatic reasoning schema theory, which lacks the pragmatic concepts of perspectives and cheating detection.
Contracts and management services site support program plan WBS 6.10.14
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1994-09-01
Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Programmore » Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.« less
Mechanisms of reflex bladder activation by pudendal afferents
Woock, John P.; Yoo, Paul B.
2011-01-01
Activation of pudendal afferents can evoke bladder contraction or relaxation dependent on the frequency of stimulation, but the mechanisms of reflex bladder excitation evoked by pudendal afferent stimulation are unknown. The objective of this study was to determine the contributions of sympathetic and parasympathetic mechanisms to bladder contractions evoked by stimulation of the dorsal nerve of the penis (DNP) in α-chloralose anesthetized adult male cats. Bladder contractions were evoked by DNP stimulation only above a bladder volume threshold equal to 73 ± 12% of the distension-evoked reflex contraction volume threshold. Bilateral hypogastric nerve transection (to eliminate sympathetic innervation of the bladder) or administration of propranolol (a β-adrenergic antagonist) decreased the stimulation-evoked and distension-evoked volume thresholds by −25% to −39%. Neither hypogastric nerve transection nor propranolol affected contraction magnitude, and robust bladder contractions were still evoked by stimulation at volume thresholds below the distension-evoked volume threshold. As well, inhibition of distention-evoked reflex bladder contractions by 10 Hz stimulation of the DNP was preserved following bilateral hypogastric nerve transection. Administration of phentolamine (an α-adrenergic antagonist) increased stimulation-evoked and distension-evoked volume thresholds by 18%, but again, robust contractions were still evoked by stimulation at volumes below the distension-evoked threshold. These results indicate that sympathetic mechanisms contribute to establishing the volume dependence of reflex contractions but are not critical to the excitatory pudendal to bladder reflex. A strong correlation between the magnitude of stimulation-evoked bladder contractions and bladder volume supports that convergence of pelvic afferents and pudendal afferents is responsible for bladder excitation evoked by pudendal afferents. Further, abolition of stimulation-evoked bladder contractions following administration of hexamethonium bromide confirmed that contractions were generated by pelvic efferent activation via the pelvic ganglion. These findings indicate that pudendal afferent stimulation evokes bladder contractions through convergence with pelvic afferents to increase pelvic efferent activity. PMID:21068196
Technology Development Report: CDDF, Dual Use Partnerships, SBIR/STTR: Fiscal Year 2003 Activities
NASA Technical Reports Server (NTRS)
Bailey, John W.
2004-01-01
The FY2003 NASA John C. Stennis Stennis Space Center (SSC) Technology Development Report provides an integrated report of all technology development activities at SSC. This report actually combines three annual reports: the Center Director's Discretionary Fund (CDDF) Program Report, Dual Use Program Report, and the Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) Program Report. These reports are integrated in one document to summarize all technology development activities underway in support of the NASA missions assigned to SSC. The Dual Use Program Report provides a summary review of the results and status of the nine (9) Dual Use technology development partnership projects funded and managed at SSC during FY2003. The objective of these partnership projects is to develop or enhance technologies that will meet the technology needs of the two NASA SSC Mission Areas: Propulsion Test and Earth Science Applications. During FY2003, the TDTO managed twenty (20) SBIR Phase II Projects and two (2) STTR Phase II Projects. The SBIR contracts support low TRL technology development that supports both the Propulsion Test and the Earth Science Application missions. These projects are shown in the SBIR/STTR Report. In addition to the Phase II contracts, the TDTO managed ten (10) SBIR Phase I contracts which are fixed price, six month feasibility study contracts. These are not listed in this report. Together, the Dual Use Projects and the SBIR/STTR Projects constitute a technology development partnership approach that has demonstrated that success can be achieved through the identification of the technical needs of the NASA mission and using various available partnership techniques to maximize resource utilization to achieve mutual technology goals. Greater use of these partnership techniques and the resource leveraging they provide, is a goal of the TDTO, providing more support to meet the technology development needs of the mission areas at SSC.
Teaching Triple Science: GCSE Chemistry
ERIC Educational Resources Information Center
Learning and Skills Network (NJ3), 2007
2007-01-01
The Department for Children, Schools and Families (DCSF) has contracted with the Learning and Skills Network to support awareness and take-up of Triple Science GCSEs through the Triple Science Support Programme. This publication provides an introduction to teaching and learning approaches for the extension topics within GCSE Chemistry. It…
48 CFR 715.370-1 - Title XII selection procedure-general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... essential, a statement of work, estimate of personnel requirements, special requirements (logistic support... statement of work, an estimate of the personnel required, and special provisions (such as logistic support, government furnished equipment, and so forth), a proposed contract format, and evaluation criteria. No cost...
75 FR 51437 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... Control Number: 0596-NEW. Summary of Collection: The authorization to survey vendors for customer service... contracts for equipment and services at the Forest Service (FS). Using an online electronic survey the FS... system, customer service support, and other supporting tools. The information will be collected and...
System Maturity Indices for Decision Support in the Defense Acquisition Process
2008-04-23
technologies, but was to be used as ontology for contracting support (Sadin, Povinelli , & Rosen, 1989), thus TRL does not address: A complete...via probabilistic solution discovery. Reliability Engineering & System Safety. In press. Sadin, S.R., Povinelli , F.P., & Rosen, R. (1989). The NASA
38 CFR 21.4153 - Reimbursement of expenses.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., such as social security, retirement, and health, accident, or life insurance, that are payable to all... of a contract must be supported by factual vouchers and all transportation allowances must be supported by detailed claims which can be checked against work assignments in the office of the State...
Code of Federal Regulations, 2013 CFR
2013-10-01
... REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 301.608 Training... Arrangements). • CON 110 (Mission Support Planning). Purchase cardholders and Approving Officials Yearly... appropriations law. • CON 100 (Shaping Smart Business Arrangements). • CON 110 (Mission Support Planning). Agency...
Code of Federal Regulations, 2014 CFR
2014-10-01
... REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities 301.608 Training... Arrangements). • CON 110 (Mission Support Planning). Purchase cardholders and Approving Officials Yearly... appropriations law. • CON 100 (Shaping Smart Business Arrangements). • CON 110 (Mission Support Planning). Agency...
Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.
1982-04-01
Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975
Oil Pharmacy at the Thermal Protection System Facility
2017-08-08
Tim King of Jacobs at NASA's Kennedy Space Center in Florida, explains operations in the Oil Pharmacy operated under the Test and Operations Support Contract, or TOSC. The facility consolidated storage and distribution of petroleum products used in equipment maintained under the contract. This included standardized naming, testing processes and provided a central location for distribution of oils used in everything from simple machinery to the crawler-transporter and cranes in the Vehicle Assembly Building.
2012-09-01
analysis of CSF survey results conducted to test for similarities amongst the different contracting agencies. This analysis will help further the academic...acquisition; test and evaluation; training facilities and equipment; repair and modification; and in-service engineering and logistics support (NAVAIR...138 253,191,378.22 HONEYWELL INTERNATIONAL INC. 1,240 248,606,761.32 SCIENTIFIC RESEARCH CORP 945 242,823,383.93 HENSEL PHELPS CONSTRUCTION CO 65
NASA Technical Reports Server (NTRS)
Krabill, W. (Technical Monitor)
2001-01-01
Contract NAS5-99094 was initiated on December 1, 1998. The subject contract contains 5 tasks covering specific activities in support of 3 major sensor programs, each with a separate NASA Principal Investigator (PI). Accordingly, the bimonthly narrative is organized such that each of the programs are discussed separately with individual task activities presented within each of the programs. Acronyms are used throughout the report to keep the writing succinct. An attached glossary contains definitions for these acronyms.
1982-06-01
Negotiations in General 72 Negotiations with Europeans 72 APPENDICES A. Information on Survey Populations and Respondents 73 B . Survey Questionnaire...included in the survey. A copy of the questionnaire is continued in Appendix B . Subsequently, the support of the four product divisions was requested...uncertainty concerning the number of personnel who would respond to the request for participation in the survey. APPENDIX B AIR FORCE CONTRACT
2015-08-27
ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure
Radiology practices and their contracts with hospitals, 1989-1990: a representative sample survey.
Sunshine, J; Chan, W C; Kassing, P J
1991-12-01
Because of concern about pressures from hospitals for changes in their contracts with radiology practices, the American College of Radiology undertook a stratified sample survey of radiology practices and their contracts with hospitals in late 1989 and early 1990. After three remailings, the survey obtained 904 valid responses for a 64% response rate. It found (weighting data to represent all radiology practices in the nation) that 91% of radiology practices provide services in hospitals. There are contracts at 57% of these hospital sites, and hospitals use tax-exempt bond financing in 54% of the sites with contracts. One year is the most common duration of contracts, and 90 days is the most common cancellation period (89% of contracts can be canceled during the contract's term). Eighty-six percent of contracts are exclusive; 73% are automatically renewable ("evergreen"). Separate billing exists in well over 90% of hospitals with contracts. Two percent of contracts require radiologists to provide equipment; 4% require them to provide support staff. There are fixed-fee arrangements in 9% of contracts and percent compensation arrangements in 3%. Hospitals share in radiologists' fees as a charge for contractual privileges in 5% of contracts. Twenty-seven percent of contracts require hospital approval for radiologists' fee increases; 19% require radiologists to participate with Blue Shield or Medicare. If a contract characteristic is predominant nationally, it is predominant in every region, for solo, small, medium, and large practices, and whether or not hospitals use tax-exempt bond financing. There is, however, some modest variation in frequency of contract provisions. Multivariate analysis shows that most such variation reflects true effects of region and other variables, not statistical artifacts. Region was a statistically significant determinant of 11 of 17 contract characteristics studied. Practice size was a statistically significant determinant of only about half as many characteristics. The survey found some interference in the independence of radiology practices (e.g., required hospital approval of fee increases), questionable clauses (e.g., mandated provision of equipment), and even illegal ones (hospitals charging a fee for contract privileges). Knowledge of the survey findings can make individual radiology practices more effective in negotiations with hospitals and assist the profession in forming a strategy to oppose disadvantageous and illegal provisions.
Displays obligations for grants, contracts, training fellowships, intramural research, and management and support, including the number of grant awards, funding amounts, and percent of the total NCI budget.
Flow caused by the stalk contraction of Vorticella
NASA Astrophysics Data System (ADS)
Ryu, Sangjin; Chung, Eun-Gul; Admiraal, David
2016-11-01
Vorticella is a stalked protozoan, and its ultrafast stalk contraction moves the spherically-shrunken cell body (zooid) and thus causes surrounding water to flow. Because the fluid dynamics of this water flow is important for understanding the motility of Vorticella, we investigated the flow based on various fluid dynamics approaches. To find why Vorticella contracts its stalk, we propose a hypothesis that the protist utilizes the contraction-induced water flow to augment transport of food particles. This hypothesis was investigated using a computational fluid dynamics (CFD) model, which was validated with an experimental scale model of Vorticella. The CFD model enabled calculating the motion of particles around Vorticella and thus quantifying the transport effect of the stalk contraction. Also, we have developed a hydrodynamic drag model for easier estimation of Vorticella's contractility without using the CFD model. Because the contractile force of the stalk equals the drag on the moving zooid, the model enabled evaluating the contractile force and energetics of Vorticella based on its contraction speed. Analyses using the drag model show that the stalk contractility of Vorticella depends on the stalk length. This study was supported by UNL Layman Seed Grant and Nebraska EPSCoR First Award Grant.
Instrument to measure psychological contract violation in pharmacy students.
Spies, Alan R; Wilkin, Noel E; Bentley, John P; Bouldin, Alicia S; Wilson, Marvin C; Holmes, Erin R
2010-08-10
To adapt and evaluate an instrument that measures perceived psychological contract violations in pharmacy students by schools and colleges of pharmacy. A psychological contract violations measure was developed from existing literature and the 1997 ACPE Guidelines and pilot-tested with second-year pharmacy students at 2 schools of pharmacy. A revised measure then was administered to second-year pharmacy students at 6 schools of pharmacy. Using a 5-point Likert-type scale, participants were asked to indicate the level of obligations they received compared to what was promised by the school of pharmacy. Exploratory factor analysis on the psychological contract violations measure was conducted using principal components analysis resulting in 7 factors, which led to a revised measure with 26 items. Using a sample of 339 students, the proposed 7-factor measurement model was tested using confirmatory factor analysis. In general, the results supported the hypothesized model. The final 23-item scale demonstrated both reliability and validity. Some students perceived certain aspects of the psychological contract that exists with their school of pharmacy were being violated. The psychological contract violations measure may serve as a valuable tool in helping to identify areas where their students believe that schools/colleges of pharmacy have not fulfilled promised obligations.
NASA Astrophysics Data System (ADS)
Terahama, Yukinori; Takahashi, Yoshiyasu; Suzuki, Shigeru; Kinukawa, Hiroshi
Recent years, maintenance of corporate soundness and compliance with the law and corporate ethics are getting more significant in the insurance industry, regardless of life insurance. In the other hand, division of production and distribution is increasing. Therefore the problem of compliance with an agency is getting more significant. We propose a contract procedure in an agency separated products explanation and applied process for protection of the personal information. Our proposed procedure protects the personal information of the contractor and supports the compliance observance for contracts with the background texture watermarks and the redactable signature. We have developed a prototype system of the solution to check its feasibility.
Willging, Cathleen E.; Aarons, Gregory A.; Trott, Elise M.; Green, Amy E.; Finn, Natalie; Ehrhart, Mark G.; Hecht, Debra B.
2016-01-01
Sustainment of evidence-based interventions (EBIs) in human services depends on the inner context of community-based organizations (CBOs) that provide services and the outer context of their broader environment. Increasingly, public officials are experimenting with contracting models from for-profit industries to procure human services. In this case study, we conducted qualitative interviews with key government and CBO stakeholders to examine implementation of the Best Value-Performance Information Procurement System to contract for EBIs in a child welfare system. Findings suggest that stakeholder relationships may be compromised when procurement disregards local knowledge, communication, collaboration, and other factors supporting EBIs and public health initiatives. PMID:26386977
Basic Education and Policy Support (BEPS) Activity.
ERIC Educational Resources Information Center
Creative Associates International, Inc., Washington, DC.
The Basic Education and Policy Support (BEPS) Activity is a multi-year, worldwide, indefinite quantity contract by which the U.S. Agency for International Development (USAID) Global Bureau Center for Human Capacity (G/HCD) can work to achieve four objectives: (1) improve the quality, efficiency, access, and equity of education, particularly basic…
Code of Federal Regulations, 2010 CFR
2010-10-01
...-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Support System § 154.470 General. (a) A cargo tank must have a support system that: (1) prevents movement of the cargo tank under the static and dynamic loads in § 154.406; and (2) allows the cargo tank to contract and expand from...
41 CFR 101-30.404-1 - Consolidation of supply support requests.
Code of Federal Regulations, 2012 CFR
2012-07-01
... support requests. 101-30.404-1 Section 101-30.404-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.404-1 Consolidation of supply...
41 CFR 101-30.404-1 - Consolidation of supply support requests.
Code of Federal Regulations, 2013 CFR
2013-07-01
... support requests. 101-30.404-1 Section 101-30.404-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.404-1 Consolidation of supply...
41 CFR 101-30.404-1 - Consolidation of supply support requests.
Code of Federal Regulations, 2011 CFR
2011-07-01
... support requests. 101-30.404-1 Section 101-30.404-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.404-1 Consolidation of supply...
41 CFR 101-30.404-1 - Consolidation of supply support requests.
Code of Federal Regulations, 2014 CFR
2014-07-01
... support requests. 101-30.404-1 Section 101-30.404-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.404-1 Consolidation of supply...
41 CFR 101-30.404-1 - Consolidation of supply support requests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... support requests. 101-30.404-1 Section 101-30.404-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.404-1 Consolidation of supply...
Teaching Triple Science: GCSE Biology
ERIC Educational Resources Information Center
Learning and Skills Network (NJ3), 2007
2007-01-01
The Department for Children, Schools and Families (DCSF) has contracted with the Learning and Skills Network to support awareness and take-up of Triple Science GCSEs through the Triple Science Support Programme. This publication provides an introduction to teaching and learning approaches for the extension topics within GCSE Biology. It highlights…
78 FR 25443 - Federal Acquisition Regulation; Submission for OMB Review; Indirect Cost Rates
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
... supporting cost data are the cost accounting information normally prepared by organizations under sound management and accounting practices. The proposal and supporting data is used by the contracting official and...; Submission for OMB Review; Indirect Cost Rates AGENCY: Department of Defense (DOD), General Services...
GPHS-RTGs in support of the Cassini mission
NASA Astrophysics Data System (ADS)
1994-04-01
This report is organized by the program task structure as follows: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple fabrication; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance and reliability, contract changes, noncapital contractor acquired government owned property (CAGO) acquisition, and CAGO maintenance; and (10) CAGO acquisition.
Integrate and fire neural networks, piecewise contractive maps and limit cycles.
Catsigeras, Eleonora; Guiraud, Pierre
2013-09-01
We study the global dynamics of integrate and fire neural networks composed of an arbitrary number of identical neurons interacting by inhibition and excitation. We prove that if the interactions are strong enough, then the support of the stable asymptotic dynamics consists of limit cycles. We also find sufficient conditions for the synchronization of networks containing excitatory neurons. The proofs are based on the analysis of the equivalent dynamics of a piecewise continuous Poincaré map associated to the system. We show that for efficient interactions the Poincaré map is piecewise contractive. Using this contraction property, we prove that there exist a countable number of limit cycles attracting all the orbits dropping into the stable subset of the phase space. This result applies not only to the Poincaré map under study, but also to a wide class of general n-dimensional piecewise contractive maps.
Zagenczyk, Thomas J.; Smallfield, Jarvis; Scott, Kristin L.; Galloway, Bret; Purvis, Russell L.
2017-01-01
We use trait activation and psychological contracts theories to build the argument that narcissism is a personality trait that will manifest itself in the form of exit and neglect when employees experience psychological contract violation. To test our hypotheses, we surveyed 262 employees from a wide array of industries working in different organizations at two points in time. Our results indicate that violation moderated the relationship between narcissism and exit such that narcissistic employees who experienced high levels of violation had higher levels of exit. However, we did not find support for our prediction regarding neglect. The findings suggest that the importance of narcissism at work may be contingent on the situation. Our study contributes to research on narcissism in the workplace, trait activation theory, and the role that individual differences play in shaping employee responses to psychological contract violation. PMID:28713315
Healthcare Blockchain System Using Smart Contracts for Secure Automated Remote Patient Monitoring.
Griggs, Kristen N; Ossipova, Olya; Kohlios, Christopher P; Baccarini, Alessandro N; Howson, Emily A; Hayajneh, Thaier
2018-06-06
As Internet of Things (IoT) devices and other remote patient monitoring systems increase in popularity, security concerns about the transfer and logging of data transactions arise. In order to handle the protected health information (PHI) generated by these devices, we propose utilizing blockchain-based smart contracts to facilitate secure analysis and management of medical sensors. Using a private blockchain based on the Ethereum protocol, we created a system where the sensors communicate with a smart device that calls smart contracts and writes records of all events on the blockchain. This smart contract system would support real-time patient monitoring and medical interventions by sending notifications to patients and medical professionals, while also maintaining a secure record of who has initiated these activities. This would resolve many security vulnerabilities associated with remote patient monitoring and automate the delivery of notifications to all involved parties in a HIPAA compliant manner.
Zagenczyk, Thomas J; Smallfield, Jarvis; Scott, Kristin L; Galloway, Bret; Purvis, Russell L
2017-01-01
We use trait activation and psychological contracts theories to build the argument that narcissism is a personality trait that will manifest itself in the form of exit and neglect when employees experience psychological contract violation. To test our hypotheses, we surveyed 262 employees from a wide array of industries working in different organizations at two points in time. Our results indicate that violation moderated the relationship between narcissism and exit such that narcissistic employees who experienced high levels of violation had higher levels of exit. However, we did not find support for our prediction regarding neglect. The findings suggest that the importance of narcissism at work may be contingent on the situation. Our study contributes to research on narcissism in the workplace, trait activation theory, and the role that individual differences play in shaping employee responses to psychological contract violation.
Psychological contracts: a new strategy for retaining reduced-hour physicians.
Hartwell, Jennifer K
2010-01-01
As a retention strategy, healthcare organizations offer reduced-hour schedules to physicians seeking better work-family balance. However, this quantitative study of 94 full-time and reduced-hour female physicians in the Boston area found that working fewer hours helps physicians achieve better balance but does not improve their burnout or career satisfaction, or impact their intention to quit or leave the field of medicine. Instead, the findings demonstrate that psychological contract fulfillment, which reflects the subjective nature of the employment relationship, is more important than work hours, an objective job condition, in predicting intention to quit and these other outcomes. A fine-grained analysis is initiated uncovering the multidimensionality of the psychological contract construct. To integrate successful reduced-hour arrangements for physicians, medical managers are directed to the importance of understanding the composition of reduced-hour physicians' psychological contracts, specifically, their need to do challenging work, receive high levels of supervisor support, and promotion opportunities.
Maintenance and Logistics Support for the International Monitoring System Network of the CTBTO
NASA Astrophysics Data System (ADS)
Haslinger, F.; Brely, N.; Akrawy, M.
2007-05-01
The global network of the International Monitoring System (IMS) of the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO), once completed, will consist of 321 monitoring facilities of four different technologies: hydroacoustic, seismic, infrasonic, and radionuclide. As of today, about 65% of the installations are completed and contribute data to the products issued by the International Data Centre (IDC) of the CTBTO. In order to accomplish the task to reliably collect evidence for any potential nuclear test explosion anywhere on the planet, all stations are required to perform to very high data availability requirements (at least 98% data availability over a 12-month period). To enable reaching this requirement, a three-layer concept has been developed to allow efficient support of the IMS stations: Operations, Maintenance and Logistics, and Engineering. Within this concept Maintenance and Logistics provide second level support of the stations, whereby problems arising at the station are assigned through the IMS ticket system to Maintenance if they cannot be resolved on the Operations level. Maintenance will then activate the required resources to appropriately address and ultimately resolve the problem. These resources may be equipment support contracts, other third party contracts, or the dispatch of a maintenance team. Engineering Support will be activated if the problem requires redesign of the station or after catastrophic failures when a total rebuild of a station may be necessary. In this model, Logistics Support is responsible for parts replenishment and support contract management. Logistics Support also collects and analyzes relevant failure mode and effect information, develops supportability models, and has the responsibility for document management, obsolescence, risk & quality, and configuration management, which are key elements for efficient station support. Maintenance Support in addition is responsible for maintenance strategies, for planning and oversight of the execution of preventive maintenance programs by the Station Operators, and for review of operational troubleshooting procedures used in first level support. Particular challenges for the efficient and successful Maintenance and Logistics Support of the IMS network lie in the specific political boundary conditions regulating its implementation, in the fact that all IMS facilities and their equipment are owned by the respective host countries, and in finding the appropriate balance between outsourcing services and retaining essential in-house expertise.
Icing Simulation Research Supporting the Ice-Accretion Testing of Large-Scale Swept-Wing Models
NASA Technical Reports Server (NTRS)
Yadlin, Yoram; Monnig, Jaime T.; Malone, Adam M.; Paul, Bernard P.
2018-01-01
The work summarized in this report is a continuation of NASA's Large-Scale, Swept-Wing Test Articles Fabrication; Research and Test Support for NASA IRT contract (NNC10BA05 -NNC14TA36T) performed by Boeing under the NASA Research and Technology for Aerospace Propulsion Systems (RTAPS) contract. In the study conducted under RTAPS, a series of icing tests in the Icing Research Tunnel (IRT) have been conducted to characterize ice formations on large-scale swept wings representative of modern commercial transport airplanes. The outcome of that campaign was a large database of ice-accretion geometries that can be used for subsequent aerodynamic evaluation in other experimental facilities and for validation of ice-accretion prediction codes.
2013-01-17
CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, Jacobs Technology Deputy General Manager Lorna Kenna speaks at a town hall meeting providing attendees an opportunity to learn about the Test and Operations Support Contract, or TOSC, hiring process and to introduce the organization's management team. NASA recently awarded its TOSC contract to Jacobs Technology Inc. of Tullahoma, Tenn. Jacobs will provide overall management and implementation of ground systems capabilities, flight hardware processing and launch operations at Kennedy. These tasks will support the International Space Station, Ground Systems Development and Operations, and the Space Launch System, Orion Multi-Purpose Crew Vehicle and Launch Services programs. For more information, visit http://www.nasa.gov/centers/kennedy/news/tosc_awarded.html Photo credit: NASA/Dimitri Gerondidakis
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-11-01
On August 6, 1996, the Richland Operations Office (Richland) awarded the Project Hanford Management Contract (Management Contract) to Fluor Daniel Hanford, Inc. (Fluor Daniel). This performance-based, 5-year contract to support cleanup of the Department of Energy`s (DOE) Hanford Site (Hanford) contained performance goals or expectations related to the stabilization, transition, and diversification of the Tri-Cities` economy near Hanford in southeastern Washington. One of these economic goals was that Fluor Daniel and its major subcontractors would help generate 3,000 new, non-Hanford, private sector jobs that would help stabilize and diversify the Tri-Cities` economy. The contract specifically called for Fluor Daniel tomore » help generate 200 jobs, establish an investment fund, and bring 6 new growth-oriented enterprise companies to the Tri-Cities by the end of Fiscal Year (FY) 1997. The objective of the audit was to determine whether Richland was making adequate progress in stabilizing and diversifying the economy of the Tri-Cities by creating 3,000 new, non-Hanford jobs within 5 years. Accordingly, the author examined the progress made in FY 1997, which was the first year of the Management Contract. Richland and Fluor Daniel are at risk of not meeting the Management Contract`s goals of stabilizing and diversifying the economy of the Tri-Cities because most of the new jobs created during FY 1997 were not comparable to Hanford jobs and, thus, may not sustain long-term economic goals. Therefore, Fluor Daniel has not met its expectations in the first year and is not making adequate progress toward meeting the Management Contract`s overall economic goals.« less
The National Carbon Capture Center at the Power Systems Development Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2014-12-30
The National Carbon Capture Center (NCCC) at the Power Systems Development Facility supports the Department of Energy (DOE) goal of promoting the United States’ energy security through reliable, clean, and affordable energy produced from coal. Work at the NCCC supports the development of new power technologies and the continued operation of conventional power plants under CO 2 emission constraints. The NCCC includes adaptable slipstreams that allow technology development of CO 2 capture concepts using coal-derived syngas and flue gas in industrial settings. Because of the ability to operate under a wide range of flow rates and process conditions, research atmore » the NCCC can effectively evaluate technologies at various levels of maturity and accelerate their development path to commercialization. During its first contract period, from October 1, 2008, through December 30, 2014, the NCCC designed, constructed, and began operation of the Post-Combustion Carbon Capture Center (PC4). Testing of CO 2 capture technologies commenced in 2011, and through the end of the contract period, more than 25,000 hours of testing had been achieved, supporting a variety of technology developers. Technologies tested included advanced solvents, enzymes, membranes, sorbents, and associated systems. The NCCC continued operation of the existing gasification facilities, which have been in operation since 1996, to support the advancement of technologies for next-generation gasification processes and pre-combustion CO 2 capture. The gasification process operated for 13 test runs, supporting over 30,000 hours combined of both gasification and pre-combustion technology developer testing. Throughout the contract period, the NCCC incorporated numerous modifications to the facilities to accommodate technology developers and increase test capabilities. Preparations for further testing were ongoing to continue advancement of the most promising technologies for future power generation processes.« less
Contracting for Efficiency. A Best Practices Guide for Energy-Efficient Product Procurement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bunch, Saralyn; Payne, Christopher
2016-04-01
The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.
NASA Technical Reports Server (NTRS)
1998-01-01
SpaceAge Control, Inc., was established in 1968 to design, develop and manufacture pilot protection devices in support of space-based and high-performance test aircraft programs. In 1970, the company was awarded a NASA contract to produce precision, small-format position transducers for aircraft flight control testing. The successful completion of this contract led to the development and production of a complete line of position transducers. Today the company has over 600 customers in 20 industries and over 30 countries.
Does your small business need early-stage financing to take its cancer research to the next level? The National Cancer Institute Small Business Innovation Research (NCI SBIR) Development Center has released $5 million for new contract funding opportunities to support cancer research and technology development in key emerging areas of need. The NCI SBIR can help you finance and advance innovations in cancer prevention, diagnosis, treatment, and basic research.
Electromagnetic Scattering from a Homogeneous Body of Revolution
1977-11-01
was supported by the Rome Air Development Center through the Deputy of Electronic Technology under Contract/ No. F19628-76-C-0300,’and through the... Air Force Post Doctoral Program under Contract No. F30602-75-0121. DFPARITfENT OF / ELECTRICAL AND COMPUTER ENGINEERIN(C SYRACUSE UNIVERS1 TY SYRACUSE...material cylinders by Chang and Harrington [21, and to material bodies of revolu- tion by Wu [3]. We will call this choice the PMCHW formulation
2008-03-11
guidance dealing with contractors who support deployed forces in October 2005. However, as we recently testified , DOD’s leadership needs to ensure...GAO-08-572T may be “ borderline inherently governmental.”14 We have also found problems with contractors having too much control at other...contract oversight personnel, lessons learned, and training of military commanders and contract oversight personnel. More recently, we testified that DOD’s
Defense Logistical Support Contracts in Iraq and Afghanistan: Issues for Congress
2009-06-24
on Wartime Contracting in Iraq and Afghanistan; • Section 852 calls for the Army Audit Agency, the Navy Audit Services, and the Air Force Audit...reporting requirements for contractors that perform security functions in areas of combat operations and are involved in the discharge of a weapon or other...hand in dealing with industry. As an example, Secretary of the Navy Donald C. Winter and Chief of Naval Operations Adm. Michael G. Mullen have reported
Contracting for Efficiency: A Best Practices Guide for Energy Efficient Product Procurement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bunch, Saralyn; Payne, Christopher
The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.
Contracting for Agile Software Development in the Department of Defense: An Introduction
2015-08-01
Requirements are fixed at a more granular level; reviews of the work product happen more frequently and assess each individual increment rather than a “ big bang ...boundaries than “ big - bang ” development. The implementation of incremental or progressive reviews enables just that—any issues identified at the time of the...the contract needs to support the delivery of deployable software at defined increments/intervals, rather than incentivizing “ big - bang ” efforts or
Impact of Continuous Competition on Operations and Support Costs
2011-05-01
transaction costs High transaction costs Figure 6: Perfectly Competitive Market and Defense Market Structures Source: (Katz & Rosen , 1998) Monopoly...Source: (Katz & Rosen , 1998) Although the purpose of a contract is to set firm obligations between buyer and seller, many of the DoD’s contracts...Italy, Denmark, The Netherlands, Norway, and Turkey (Gertler, 2010; “Israel’s Barak Approves,” 2010). Many of these allies are interested in
Human Resource Management and Army Recruiting. Analysis of Policy Options
2006-01-01
Forces Qualification Test ARISS -MPA Army Recruiting Information Support System— Mission Production Awards CMF Career Management Field DA Department of...called the Army Recruiting Information Support System—Mission Production Awards ( ARISS -MPA). 2 Appendix C provides more detailed information about these...Management and Army Recruiting Table B.1 Data Sources Contracts Army Recruiting Information Support System—Mission Production Awards ( ARISS -MPA), United
ERIC Educational Resources Information Center
Chou, Rita Jing-Ann
2011-01-01
Purpose: The Family Support Agreement (FSA) is a voluntary but legal contract between older parents and adult children on parental support in China. As the first comprehensive empirical study on the FSA, this study aims to understand the prevalence and covariates of older parents' perceived need and actual use of this agreement. Design and…
2014-05-01
DISTRIBUTION A. Approved for public release: distribution unlimited. INFORMATION, UNDERSTANDING, AND INFLUENCE: AN AGENCY THEORY STRATEGY ...Influence: An Agency Theory Strategy For Air Base Communications And Cyberspace Support 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...present communications and cyberspace support organizations. Next, it introduces a strategy based on this analysis to bring information, understanding
Program Direction FY 2017 Budget At-A-Glance
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2016-03-01
Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.
48 CFR 801.670-4 - National Cemetery Administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Authority, and Responsibilities 801.670-4 National Cemetery Administration. The Director of Logistics Management Service, the Centralized Contracting Division, and the Construction Support Division are...
The Impact of Space Commercialization on Space Agencies: the Case of NASA
NASA Astrophysics Data System (ADS)
Zervos, Vasilis
2002-01-01
The purpose of this paper is to examine the hypothesis that commercialisation of space results in inefficient contracting policies by the space agencies, using the US NASA as a case study. Though commercialisation is seen by many as a way to reduce costs in space programmes, as the space industry is seen as a decreasing costs industry, this is not a problem-free process. Commercialisation of space has affected the US and European space industries and policies in two major ways. The first is that the public sector actively encourages mergers and acquisitions of major contractors, confined, however, within the geographical borders of the US and Europe. This follows largely from the perceived benefits of economies of size when competing in global commercial markets. The second is the formation of an increasing number of public-private partnerships (PPPs) in space programmes and a more `cosy' relationship between the two within a public-assistance strategic trade theoretic framework. As ESA's contracting policy of `juste retour' is marked by limited competition, the paper focuses on the case of NASA, which is expected to be more pro- competitive, to examine the impact of commercialisation. With the use of quantitative methods based on time series econometric analysis, the paper shows that NASA's contracting policy, results in increasingly less competition and more rent-favouring contracting. This is attributed to the decreasing number of major contractors in conjunction with the preferential treatment of the domestic space industry (`Buy American'). The results of the paper verify that the support of the domestic space industry in commercial and public space markets results in inefficient contracting policies, with NASA facing the conflicting tasks of a stated policy of enhancing competition and efficiency in contracting, as well as, supporting the competitiveness of the domestic space industry. The paper concludes with an analysis and assessment of solutions to this dilemma. 1 meeting.
Xu, Yu-Dong; Wang, Yu; Yin, Lei-Miao; Park, Gyoung-Hee; Ulloa, Luis; Yang, Yong-Qing
2017-02-26
Airway hyperresponsiveness (AHR) is a major clinical problem in allergic asthma mainly caused by the hypercontractility of airway smooth muscles (ASM). S100A8 is an important member of the S100 calcium-binding protein family with a potential to regulate cell contractility. Here, we analyze the potential of S100A8 to regulate allergen-induced AHR and ASM contraction. Treatment with recombinant S100A8 (rS100A8) diminished airway hyperresponsiveness in OVA-sensitized rats. ASM contraction assays showed that rS100A8 reduced hypercontractility in both isolated tracheal rings and primary ASM cells treated by acetylcholine. rS100A8 markedly rescued the phosphorylation level of myosin light chain induced by acetylcholine in ASM cells. These results show that rS100A8 plays a protective role in regulating AHR in asthma by inhibiting ASM contraction. These results support S100A8 as a novel therapeutic target to control ASM contraction in asthma. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.
Morgan, Kathy Ye; Black, Lauren Deems
2014-01-01
This commentary discusses the rationale behind our recently reported work entitled "Mimicking isovolumic contraction with combined electromechanical stimulation improves the development of engineered cardiac constructs," introduces new data supporting our hypothesis, and discusses future applications of our bioreactor system. The ability to stimulate engineered cardiac tissue in a bioreactor system that combines both electrical and mechanical stimulation offers a unique opportunity to simulate the appropriate dynamics between stretch and contraction and model isovolumic contraction in vitro. Our previous study demonstrated that combined electromechanical stimulation that simulated the timing of isovolumic contraction in healthy tissue improved force generation via increased contractile and calcium handling protein expression and improved hypertrophic pathway activation. In new data presented here, we further demonstrate that modification of the timing between electrical and mechanical stimulation to mimic a non-physiological process negatively impacts the functionality of the engineered constructs. We close by exploring the various disease states that have altered timing between the electrical and mechanical stimulation signals as potential future directions for the use of this system.
TASAR Certification and Operational Approval Requirements - Analyses and Results
NASA Technical Reports Server (NTRS)
Koczo, Stefan, Jr.
2015-01-01
This report documents the results of research and development work performed by Rockwell Collins in addressing the Task 1 objectives under NASA Contract NNL12AA11C. Under this contract Rockwell Collins provided analytical support to the NASA Langley Research Center (LaRC) in NASA's development of a Traffic Aware Strategic Aircrew Requests (TASAR) flight deck Electronic Flight Bag (EFB) application for technology transition into operational use. The two primary objectives of this contract were for Rockwell Collins and the University of Iowa OPL to 1) perform an implementation assessment of TASAR toward early certification and operational approval of TASAR as an EFB application (Task 1 of this contract), and 2) design, develop and conduct two Human-in-the-Loop (HITL) simulation experiments that evaluate TASAR and the associated Traffic Aware Planner (TAP) software application to determine the situational awareness and workload impacts of TASAR in the flight deck, while also assessing the level of comprehension, usefulness, and usability of the features of TAP (Task 2 of this contract). This report represents the Task 1 summary report. The Task 2 summary report is provided in [0].
Electrically stimulated contractions of Vorticella convallaria
NASA Astrophysics Data System (ADS)
Kantha, Deependra; van Winkle, David
2009-03-01
The contraction of Vorticella convallaria was triggered by applying a voltage pulse in its host culturing medium. The 50V, 1ms wide pulse was applied across platinum wires separated by 0.7 cm on a microscope slide. The contractions were recorded as cines (image sequences) by a Phantom V5 camera (Vision Research) on a bright field microscope with 20X objective, with the image size of 256 pixels x 128 pixels at 7352 pictures per second. The starting time of the cines was synchronized with the starting of the electrical pulse. We recorded five contractions of each of 12 organisms. The cines were analyzed to obtain the initiation time, defined as the difference in time between the leading edge of the electrical pulse and the first frame showing zooid movement. From multiple contractions of same organism, we found the initiation time is reproducible. In comparing different organisms, we found the average initiation time of 1.73 ms with a standard deviation of 0.63 ms. This research is supported by the state of Florida (MARTECH) and Research Corporation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND CONTRACT RENT ANNUAL ADJUSTMENT...
Platt, R D; Griggs, R A
1993-08-01
In four experiments with 760 subjects, the present study examined Cosmides' Darwinian algorithm theory of reasoning: specifically, its explanation of facilitation on the Wason selection task. The first experiment replicated Cosmides' finding of facilitation for social contract versions of the selection task, using both her multiple-problem format and a single-problem format. Experiment 2 examined performance on Cosmides' three main social contract problems while manipulating the perspective of the subject and the presence and absence of cost-benefit information. The presence of cost-benefit information improved performance in two of the three problems while the perspective manipulation had no effect. In Experiment 3, the cost-benefit effect was replicated; and performance on one of the three problems was enhanced by the presence of explicit negatives on the NOT-P and NOT-Q cards. Experiment 4 examined the role of the deontic term "must" in the facilitation observed for two of the social contract problems. The presence of "must" led to a significant improvement in performance. The results of these experiments are strongly supportive of social contract theory in that cost-benefit information is necessary for substantial facilitation to be observed in Cosmides' problems. These findings also suggest the presence of other cues that can help guide subjects to a deontic social contract interpretation when the social contract nature of the problem is not clear.
ARL Support of NRL Rocket Experiments to Investigate Ionospheric Phenomena
2010-08-31
reallocate the funds to support NRL’s ongoing efforts to develop an ionospheric tomography network in South America to support the C/NOFS satellite...of NRL Rocket Experiments to Investigate Ionospheric Phenomena 5a. CONTRACT NUMBER N00173-09-1-G036 5b. GRANT NUMBER N00173-09-1-G036 5c...1-G036 ARL Support of NRL Rocket Experiments to Investigate Ionospheric Phenomena BY DR. TREVOR W. GARNER APPLIED RESEARCH LABORATORIES THE
Meyers, R A; Mathias, E
1997-09-01
Gliding flight is a postural activity which requires the wings to be held in a horizontal position to support the weight of the body. Postural behaviors typically utilize isometric contractions in which no change in length takes place. Due to longer actin-myosin interactions, slow contracting muscle fibers represent an economical means for this type of contraction. In specialized soaring birds, such as vultures and pelicans, a deep layer of the pectoralis muscle, composed entirely of slow fibers, is believed to perform this function. Muscles involved in gliding posture were examined in California gulls (Larus californicus) and tested for the presence of slow fibers using myosin ATPase histochemistry and antibodies. Surprisingly small numbers of slow fibers were found in the M. extensor metacarpi radialis, M. coracobrachialis cranialis, and M. coracobrachialis caudalis, which function in wrist extension, wing protraction, and body support, respectively. The low number of slow fibers in these muscles and the absence of slow fibers in muscles associated with wing extension and primary body support suggest that gulls do not require slow fibers for their postural behaviors. Gulls also lack the deep belly to the pectoralis found in other gliding birds. Since bird muscle is highly oxidative, we hypothesize that fast muscle fibers may function to maintain wing position during gliding flight in California gulls.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... civilian employees deployed in support of a contingency operation, to elect Basic insurance, Option A... after the operations of the Senate Restaurants are contracted to be performed by a private business... for Basic insurance coverage and is deployed in support of a contingency operation as defined by...