Sample records for support contract final

  1. 78 FR 72572 - Operational Contract Support

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... 0790-AI48 Operational Contract Support AGENCY: Department of Defense (DoD). ACTION: Final rule. SUMMARY: This rule establishes policy, assigns responsibilities, and provides procedures for operational contract support (OCS), including OCS program management, contract support integration, and integration of...

  2. Maintenance and Drainage Guidance for the Scott Base Transition, Antarctica

    DTIC Science & Technology

    2014-10-01

    Way Centennial , CO 80112-3938 Final Report Approved for public release; distribution is unlimited. Prepared for National Science Foundation...References Antarctic Support Contract (ASC). 2014. Scott Base Transition Construction and Maintenance Manual. IO-MAN-0003. Centennial , CO: Antarctic...Support Contract. Antarctic Support Contract (ASC). Forthcoming. Snow Road Construction and Maintenance Manual. IO-MAN-xx. Centennial , CO: Antarctic

  3. Final Product Strategies in Purchasing and Their Impact on the Information Needs of the Organisation.

    ERIC Educational Resources Information Center

    Inbar, David

    Purchasing contributes significantly to an organization and to its business strategy only if its activities and contracts with suppliers are guided by support criteria for the final products that the organization sells. Outlined in this paper are four innovative purchasing strategies: capitation contracts; product life cycle cost contracts;…

  4. Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Vandenberg, N. R.; Ma, C. (Technical Monitor)

    2002-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract Nepal, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during high geodetic and astrometric VLBI evolved through several major changes. This report is divided into five sections that correspond to major task areas in the contract: A) Coordination rid Scheduling, B) Field System, CN Station Support, D) Analysis and Research and Development, and E) Computer Support.

  5. Special environmental control and life support equipment test analyses and hardware

    NASA Technical Reports Server (NTRS)

    Callahan, David M.

    1995-01-01

    This final report summarizes NAS8-38250 contract events, 'Special Environmental Control and Life Support Systems Test Analysis and Hardware'. This report is technical and includes programmatic development. Key to the success of this contract was the evaluation of Environmental Control and Life Support Systems (ECLSS) test results via sophisticated laboratory analysis capabilities. The history of the contract, including all subcontracts, is followed by the support and development of each Task.

  6. Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Vandenberg, Nancy R.; Ma, C. (Technical Monitor)

    2001-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

  7. Support for the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

    NASA Technical Reports Server (NTRS)

    Ma, C. (Technical Monitor)

    2001-01-01

    This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

  8. Professional services contract manager development and certification strategy : spr 696 : final report.

    DOT National Transportation Integrated Search

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  9. Commercial Contract Training, Marine Corps Area VOTEC Support Center (AVSC) Guidelines. Final Report.

    ERIC Educational Resources Information Center

    Copeland, D. R.; And Others

    The report provides a description of the Phase II findings of a two-phase study to determine if certain Marine Corps skill training requirements could be satisfied through contract with qualified commercial sources. It demonstrates the utility of the commercial contract training concept and contains information useful to Area VOTEC…

  10. 10 CFR 950.37 - Final agreement or final decision.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Final agreement or final decision. 950.37 Section 950.37 Energy DEPARTMENT OF ENERGY STANDBY SUPPORT FOR CERTAIN NUCLEAR PLANT DELAYS Dispute Resolution Process § 950.37 Final agreement or final decision. (a) If the parties reach a Final Agreement on a contract...

  11. Analysis of Commercial Contract Training for the Navy (Phase II) [And] Commercial Contract Training Navy Area VOTEC Support Center (AVSC) Guidelines. Final Report.

    ERIC Educational Resources Information Center

    Copeland, D. Robert; And Others

    The two-part report describing the Phase 2 findings of a two-phase study demonstrates the utility of the commercial contract training concept for satisfying certain Navy skill training requirements. Part 1 concerns source evaluation, skill analysis and selection, contractual considerations, and comparative training capability evaluation. It…

  12. Student nurses' experiences of using a learning contract as a method of assessment.

    PubMed

    Bailey, Maria E; Tuohy, Dympna

    2009-10-01

    The purpose of this study was to describe final year undergraduate nurses' experiences of assessment through the use of a learning contract. Using a qualitative descriptive design, data was collected from a purposive sample of final (fourth) year undergraduate student nurses. Two approaches were taken for data collection, anonymous evaluative questionnaires and interviews. The study was approved by the local university research and ethics committee. Data was thematically analysed. This article presents and discusses the findings from the interviews. Findings suggest that students' approach to the assessment strategy influenced engagement with the learning contract. Three themes were identified: skills, perceptions, and actions. Within these themes three types of learner were identified: happy, pragmatic and fearful. Factors found to influence successful completion of the learning contract were: support, relevant skills, prior experiential learning and required theoretical knowledge. Recommendations include the need for educators to consider module assessments that recognise the learning needs and preferences of the student within a supportive environment.

  13. Analysis of Commercial Contract Training for the Marine Corps (Phase II) [And] Commercial Contract Training Marine Corps Area VOTEC Support Center (AVSC) Guidelines. Final Report.

    ERIC Educational Resources Information Center

    Copeland, D. Robert; And Others

    The two-part report describing the Phase 2 findings of a two-phase study demonstrates the utility of the commercial contract training concept for satisfying certain Marine Corps skill training requirements. Part 1 concerns source evaluation, skill analysis and selection, contractual considerations, and comparative training capability evaluation.…

  14. Research to Support Intelligent Data Management

    NASA Technical Reports Server (NTRS)

    Lerner, B. T.

    1998-01-01

    This final report details the contract performance and analysis of research and development results obtained during the contract period. KT-Tech's research and development work results in the areas of registration of remotely sensed data and the test evaluation and porting of the Regional Validation Center software system are presented.

  15. Research to Support Intelligent Data Management

    NASA Technical Reports Server (NTRS)

    Lerner, Bao-Ting

    1998-01-01

    This final report details the contract performance and analysis of research and development results obtained during the contract period. KT-TECH's research and development work results in the areas of registration of remotely sensed data and the test evaluation and porting of the Regional Validation Center software system, are presented.

  16. 48 CFR 9904.405-60 - Illustrations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... administrative (G&A) expense. In the contractor's proposals for final Segment G&A rates (including corporate home... responsibilities on which his salary was based, no part of the official's salary would be required to be identified... the contract. The contracting officer issues a written decision which supports the auditor's position...

  17. 48 CFR 9904.405-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... administrative (G&A) expense. In the contractor's proposals for final Segment G&A rates (including corporate home... responsibilities on which his salary was based, no part of the official's salary would be required to be identified... the contract. The contracting officer issues a written decision which supports the auditor's position...

  18. 48 CFR 9904.405-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... administrative (G&A) expense. In the contractor's proposals for final Segment G&A rates (including corporate home... responsibilities on which his salary was based, no part of the official's salary would be required to be identified... the contract. The contracting officer issues a written decision which supports the auditor's position...

  19. Towards a Theory for Combining Information From Related Experiments

    DTIC Science & Technology

    2002-11-11

    TITLE AND SUBTITLE Final Report on ARO Contract # DAAD 19-99-1- 1082 entitled “Towards a theory for combining information from related...Contract # DAAD 19-99-1- 1082 4. AUTHOR OF THE REPORT: Francisco J. Samaniego, Principal Investigator 5. PERFPORMING ORGANIZATION: University of...preparation under the support of ARO Contract # DAAD 19-99-1- 1082 [1] "Linear Data Fusion", Proceedings of the Fourth Army Conference on Applied

  20. Space Transportation Systems Technologies

    NASA Technical Reports Server (NTRS)

    Laue, Jay H.

    2001-01-01

    This document is the final report by the Science Applications International Corporation (SAIC) on contracted support provided to the National Aeronautics and Space Administration (NASA) under Contract NAS8-99060, 'Space Transportation Systems Technologies'. This contract, initiated by NASA's Marshall Space Flight Center (MSFC) on February 8, 1999, was focused on space systems technologies that directly support NASA's space flight goals. It was awarded as a Cost-Plus-Incentive-Fee (CPIF) contract to SAIC, following a competitive procurement via NASA Research Announcement, NRA 8-21. This NRA was specifically focused on tasks related to Reusable Launch Vehicles (RLVs). Through Task Area 3 (TA-3), "Other Related Technology" of this NRA contract, SAIC extensively supported the Space Transportation Directorate of MSFC in effectively directing, integrating, and setting its mission, operations, and safety priorities for future RLV-focused space flight. Following an initially contracted Base Year (February 8, 1999 through September 30, 1999), two option years were added to the contract. These were Option Year 1 (October 1, 1999 through September 30, 2000) and Option Year 2 (October 1, 2000 through September 30, 2001). This report overviews SAIC's accomplishments for the Base Year, Option Year 1, and Option Year 2, and summarizes the support provided by SAIC to the Space Transportation Directorate, NASA/MSFC.

  1. Managed care contracting: a systematic approach.

    PubMed

    Flores, K

    1987-12-01

    Managed care is sweeping the health care industry and has produced some special challenges for providers. Success in contracting depends on preparation. In this article, the author defines managed care and outlines who should be involved in the contracting for these services. Special attention is given to how to develop the appropriate internal support. The author contends that a provider should not embrace all contracting offers and suggests criteria for selection of the best offers. Finally, the prevailing pricing schemes are reviewed and caveats given on their interpretation and use.

  2. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  3. In-Vehicle Information Systems Behavioral Model and Design Support: Final Report

    DOT National Transportation Integrated Search

    2000-02-16

    A great deal of effort went into producing both the model and the prototype software for this contract. The purpose of this final report is not to duplicate the information provided about these and other topics in previous reports. The purpose is to ...

  4. Multi-Task Project to Provide Research Support for Human Research and Engineering Goals Identified by the Army

    DTIC Science & Technology

    2009-06-01

    Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V

  5. Sensing technology for damage assessment of sign supports and cantilever poles : final report, August 31, 2010.

    DOT National Transportation Integrated Search

    2010-08-31

    This report presents the results of research activities conducted under Contract No. 519691-PIT 008 on Sensing Technology for : Damage Assessment of Sign Supports and Cantilever Poles between the University of Pittsburgh and the Pennsylvania De...

  6. Definition of ground test for verification of large space structure control

    NASA Technical Reports Server (NTRS)

    Glaese, John R.

    1994-01-01

    Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.

  7. Intelligent transportation systems (ITS) operational support contracts : final report.

    DOT National Transportation Integrated Search

    2005-01-31

    The New Jersey Department of Transportation (NJDOT) is currently facing a significant challenge : in keeping Intelligent Transportation Systems (ITS) at a high level of availability at the : Transportation Operation Center North (TOC North) and Trans...

  8. Primordial magnetic fields from a non-singular bouncing cosmology

    NASA Astrophysics Data System (ADS)

    Membiela, Federico Agustín

    2014-08-01

    Although inflation is a natural candidate to generate the lengths of coherence of magnetic fields needed to explain current observations, it needs to break conformal invariance of electromagnetism to obtain significant magnetic amplitudes. Of the simplest realizations are the kinetically-coupled theories f2(ϕ)FμνF (or IFF theories). However, these are known to suffer from electric fields backreaction or the strong coupling problem. In this work we shall confirm that such class of theories are problematic to support magnetogenesis during inflationary cosmology. On the contrary, we show that a bouncing cosmology with a contracting phase dominated by an equation of state with p>-ρ/3 can support magnetogenesis, evading the backreaction/strong-coupling problem. Finally, we study safe magnetogenesis in a particular bouncing model with an ekpyrotic-like contracting phase. In this case we found that f2(ϕ)F2-instabilities might arise during the final kinetic-driven expanding phase for steep ekpyrotic potentials.

  9. Dynamic Resectorization and Coordination Technology: An Evaluation of Air Traffic Control Complexity

    NASA Technical Reports Server (NTRS)

    Brinton, Christopher R.

    1996-01-01

    The work described in this report is done under contract with the National Aeronautics and Space Administration (NASA) to support the Advanced Air Transportation Technology (AATR) program. The goal of this program is to contribute to and accelerate progress in Advanced Air Transportation Technologies. Wyndemere Incorporated is supporting this goal by studying the complexity of the Air Traffic Specialist's role in maintaining the safety of the Air Transportation system. It is envisioned that the implementation of Free Flight may significantly increase the complexity and difficulty of maintaining this safety. Wyndemere Incorporated is researching potential methods to reduce this complexity. This is the final report for the contract.

  10. 48 CFR 552.232-72 - Final Payment Under Building Services Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Building Services Contracts. 552.232-72 Section 552.232-72 Federal Acquisition Regulations System GENERAL... and Clauses 552.232-72 Final Payment Under Building Services Contracts. As prescribed in 532.904(c), insert the following clause: Final Payment Under Building Services Contracts (NOV 2009) Before final...

  11. 48 CFR 32.605 - Final decisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT FINANCING Contract Debts 32.605 Final decisions. (a) The contracting officer shall issue a final decision as required by 33.211 if— (1) The contracting officer and the contractor are unable... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final decisions. 32.605...

  12. Future Aeronautical Communication Infrastructure Technology Investigation

    NASA Technical Reports Server (NTRS)

    Gilbert, Tricia; Jin, Jenny; Bergerm Jason; Henriksen, Steven

    2008-01-01

    This National Aeronautics and Space Administration (NASA) Contractor Report summarizes and documents the work performed to investigate technologies that could support long-term aeronautical mobile communications operating concepts for air traffic management (ATM) in the timeframe of 2020 and beyond, and includes the associated findings and recommendations made by ITT Corporation and NASA Glenn Research Center to the Federal Aviation Administration (FAA). The work was completed as the final phase of a multiyear NASA contract in support of the Future Communication Study (FCS), a cooperative research and development program of the United States FAA, NASA, and EUROCONTROL. This final report focuses on an assessment of final five candidate technologies, and also provides an overview of the entire technology assessment process, including final recommendations.

  13. Effective Team Support: From Modeling to Software Agents

    NASA Technical Reports Server (NTRS)

    Remington, Roger W. (Technical Monitor); John, Bonnie; Sycara, Katia

    2003-01-01

    The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and engineers and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in modeling infrastructure and task infrastructure. Work is continuing under a different contract to complete empirical data collection, cognitive modeling, and the building of software agents to support the teams task.

  14. Contracts in radiology practices: contract types and key provisions.

    PubMed

    Muroff, Julie A; Muroff, Lawrence R

    2004-07-01

    A contract between a radiology group and its physician member(s) provides the foundation for the professional relationships in a group practice. The parties are not in positions of parity; contract provisions are structured to maintain the primacy of the group over the individual members. An integration clause should be included to preclude reliance on communications that are not memorialized by the language of the contract. Precise, unambiguous terms must be used to convey the intentions of the parties. The contract should have a clear date of initiation and, if applicable, an effective date of termination. Mechanisms for termination and modification should be expressed clearly to minimize the risk of judicial interference. The method of determining and adjusting the salary and other benefits of the radiologist should be stated, as consideration is necessary to support the existence of a legal contract. The obligations of the radiologist to the practice are often stated in general terms to maximize the group's flexibility. Finally, other key clauses that are discussed in the paper should be incorporated into the contract.

  15. Crash testing of Louisiana's 3 1/2" diameter multi-directional, single steel post, small sign support : final report.

    DOT National Transportation Integrated Search

    1993-03-01

    The Louisiana Department of Transportation and Development (LDOTD) contracted with the Texas Transportation Institute (TTI) to evaluate the impact characteristics of Louisiana's multi-directional, 8.9 cm (3-1/2 in) diameter steel post, small sigh sup...

  16. 48 CFR 1552.211-77 - Final reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reports. As prescribed in 1511.011-77, insert this contract clause when a contract requires both a draft and a final report. FINAL REPORTS (SEP 2013) (a) “Draft Report”__The Contractor shall submit to the Contracting Officer's Representative __ copies of the draft final report on or before ___ (date) __ The...

  17. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  18. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  19. 48 CFR 532.905-70 - Final payment-construction and building service contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Final payment-construction...-70 Final payment—construction and building service contracts. The following procedures apply to construction and building service contracts: (a) The Government shall pay the final amount due the Contractor...

  20. ATE/ICEPM Development Report and Function Demonstration Test.

    DTIC Science & Technology

    1975-01-01

    DTfC JANUARY 1975 S U gl CONTRACT NO. DAAE07-73-C-0268 F - - -- - - b,,-4, i .y TRW SYSTEMS GROUP D - PROPULSION SYSTEMS LABORATORY t 82 07 22 067 II i ...DEMONSTRATION TEST FINAL REPORT Contract No. DAAEO7-73--C-0268 XccessiOf Yor U~ ultis. GFA& I copy~ t e!A C3 PY;E lilannoQ*C~INSPECTED otIo - Prepared by Bye...program L o Improvement of system hardware I o Preparation of systems support material 2.1 Development of the Diagnostic Engineering Structure The

  1. 16 CFR 700.8 - Warrantor's decision as final.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... jurisdiction over suits for breach of warranty and service contract. ... decision as final. A warrantor shall not indicate in any written warranty or service contract either... party is final or binding in any dispute concerning the warranty or service contract. Nor shall a...

  2. 78 FR 66639 - Modifications of Certain Derivative Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... Modifications of Certain Derivative Contracts AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Final... to the transfer or assignment of certain derivative contracts. The final regulations provide guidance to the nonassigning counterparty to a derivative contract and an assignee on certain notional...

  3. Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

  4. Interface definition for the Far Ultraviolet Spectrometer Experiment S169

    NASA Technical Reports Server (NTRS)

    Fastie, W. G.

    1971-01-01

    A final contract for development, fabrication, test and flight of the ultraviolet spectrometer experiment on an Apollo space mission is reported. Two interface control documents were completed and signed off and three more were essentially completed. Supporting preliminary concepts formulation, design study and component investigation, specification and subcontract negotiation were accomplished.

  5. Power Plant Replacement Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to bemore » self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.« less

  6. SRB Environment Evaluation and Analysis. Volume 3: ASRB Plume Induced Environments

    NASA Technical Reports Server (NTRS)

    Bender, R. L.; Brown, J. R.; Reardon, J. E.; Everson, J.; Coons, L. W.; Stuckey, C. I.; Fulton, M. S.

    1991-01-01

    Contract NAS8-37891 was expanded in late 1989 to initiate analysis of Shuttle plume induced environments as a result of the substitution of the Advanced Solid Rocket Booster (ASRB) for the Redesigned Solid Rocket Booster (RSRB). To support this analysis, REMTECH became involved in subscale and full-scale solid rocket motor test programs which further expanded the scope of work. Later contract modifications included additional tasks to produce initial design cycle environments and to specify development flight instrumentation. Volume 3 of the final report describes these analyses and contains a summary of reports resulting from various studies.

  7. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    DTIC Science & Technology

    1990-09-18

    This is our final report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas (DCMR... audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity...As part of the audit , we also evaluated internal controls over the contract closeout process. As of December 31, 1988, the Contract Administration

  8. The price of placements in residential and nursing home care: the effects of contracts and competition.

    PubMed

    Forder, J; Netten, A

    2000-10-01

    A variety of contract types are used in the placement of elderly people in residential and nursing care homes in the UK. Contracts vary according to how and when providers are paid. Among other things, prices can be made contingent on the total quantity of service to be purchased and on production cost characteristics. They can be determined at the time of placement or in advance. The primary objective of this paper is to assess the impact of contract choices on the price of placements. Regression analysis was conducted on a final sample of 1780 publicly funded placements made in 18 local authorities in the UK over a 6-month period ending in early 1996. Controlling factors included in the price analysis were production cost indicators and those measuring market competitiveness. Choices of both quantity and cost contingent contracts were found to be significantly associated with placement prices. The findings support the hypothesis that contract payment arrangements have different risk, insurance and information properties, and so have implications for the performance of residential care providers.

  9. Non-Invasive Pneumothorax Detector

    DTIC Science & Technology

    2012-04-01

    AD_________________ Award Number: W81XWH-09-2-0092 TITLE: Non-Invasive Pneumothorax Detector...REPORT TYPE Final 3. DATES COVERED 27 July 2009 – 31 August 2011 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Non-Invasive Pneumothorax ...that form the scope of work support the development and clinical testing of a non-invasive pneumothorax detector. Goal and objectives are reflected in

  10. The Center for In-Service Education. Final Evaluation Report. Volume II. Part 1.

    ERIC Educational Resources Information Center

    Tennessee State Dept. of Education, Nashville.

    This is an overview of the extensive in-service education inventory conducted as an integral portion of the planning contract for Models for In-Service Education supported by the Tennessee State Department of Education under Title III, Elementary and Secondary Education Act. The narrative descriptions are free of extensive statistical references…

  11. National Remodelling Team: Evaluation and Impact Study (Year 1) Final Report

    ERIC Educational Resources Information Center

    Wilson, Rebekah; Easton, Claire; Smith, Paula; Sharp, Caroline

    2005-01-01

    The National Remodelling Team (NRT) was established in April 2003 by the Department for Education and Skills (DfES) and hosted within the National College for School Leadership (NCSL). The role of the NRT was to work with local education authorities (LEAs) to support schools in the implementation of the changes to teachers' contracts introduced by…

  12. Evaluation of the National Science Foundation's Partnerships for International Research and Education (PIRE) Program, Volume 2: Supplementary Materials. Final Report

    ERIC Educational Resources Information Center

    Martinez, Alina; Epstein, Carter; Parsad, Amanda

    2015-01-01

    The National Science Foundation contracted with Abt Associates to conduct an evaluation of its Partnerships for International Research and Education (PIRE) program, which supports intellectually substantive collaborations between U.S. and foreign researchers in which the international partnership is essential to the research effort. The evaluation…

  13. Evaluation of the National Science Foundation's Partnerships for International Research and Education (PIRE) Program, Volume 1: Final Report

    ERIC Educational Resources Information Center

    Martinez, Alina; Epstein, Carter; Parsad, Amanda

    2015-01-01

    The National Science Foundation contracted with Abt Associates to conduct an evaluation of its Partnerships for International Research and Education (PIRE) program, which supports intellectually substantive collaborations between U.S. and foreign researchers in which the international partnership is essential to the research effort. The evaluation…

  14. 48 CFR 49.303-5 - Final settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final settlement. 49.303-5 Section 49.303-5 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Cost-Reimbursement Contracts Terminated for Convenience 49...

  15. Final Report. LAW Glass Formulation to Support AP-101 Actual Waste Testing, VSL-03R3470-2, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muller, I. S.; Pegg, I. L.; Rielley, Elizabeth

    2015-06-22

    The main objective of the work was to develop and select a glass formulation for vitrification testing of the actual waste sample of LAW AP-101 at Battelle - Pacific Northwest Division (PNWD). Other objectives of the work included preparation and characterization of glasses to demonstrate compliance with contract and processing requirements, evaluation of the ability to achieve waste loading requirements, testing to demonstrate compatibility of the glass melts with melter materials of construction, comparison of the properties of simulant and actual waste glasses, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  16. Final Report on the Audit of Architect-Engineer Contracting at the Officer in Charge of Construction, Naval Facilities Engineering Command Contracts, Mediterranean, Madrid, Spain

    DTIC Science & Technology

    1990-11-30

    This is our final report on the audit of Architect-Engineer Contracting for the Officer in Charge of Construction, Naval Facilities Engineering...Command Contracts, Mediterranean, for your information and use. This is the fourth in a series of reports issued as part of the audit of architect-engineer...A-E) contracting. The Contract Management Directorate made the audit from August 1989 through July 1990. When we expanded the audit scope to include

  17. Improving New Teacher Supports through District Capacity-Building: Final Evaluation Report for CSTP's New Teacher Alliance

    ERIC Educational Resources Information Center

    Stokes, Laura; Helms, Jenifer

    2009-01-01

    Inverness Research is an independent national educational research group based in California. Its mission is to help projects assess the quality and efficacy of their efforts, and to help funders better understand the design of their initiatives and the value of their investments. Inverness Research has served by contract with CSTP (Center for…

  18. 48 CFR 1542.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 1542.705 Section 1542.705 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 1542.705 Final indirect cost rates. (a) The... contracts when the Environmental Protection Agency (EPA) is the cognizant federal agency and a FACO will be...

  19. Instrument to measure psychological contract violation in pharmacy students.

    PubMed

    Spies, Alan R; Wilkin, Noel E; Bentley, John P; Bouldin, Alicia S; Wilson, Marvin C; Holmes, Erin R

    2010-08-10

    To adapt and evaluate an instrument that measures perceived psychological contract violations in pharmacy students by schools and colleges of pharmacy. A psychological contract violations measure was developed from existing literature and the 1997 ACPE Guidelines and pilot-tested with second-year pharmacy students at 2 schools of pharmacy. A revised measure then was administered to second-year pharmacy students at 6 schools of pharmacy. Using a 5-point Likert-type scale, participants were asked to indicate the level of obligations they received compared to what was promised by the school of pharmacy. Exploratory factor analysis on the psychological contract violations measure was conducted using principal components analysis resulting in 7 factors, which led to a revised measure with 26 items. Using a sample of 339 students, the proposed 7-factor measurement model was tested using confirmatory factor analysis. In general, the results supported the hypothesized model. The final 23-item scale demonstrated both reliability and validity. Some students perceived certain aspects of the psychological contract that exists with their school of pharmacy were being violated. The psychological contract violations measure may serve as a valuable tool in helping to identify areas where their students believe that schools/colleges of pharmacy have not fulfilled promised obligations.

  20. 76 FR 53719 - Nondisplacement of Qualified Workers Under Service Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ...In this final rule, the Department of Labor (Department or DOL) issues final regulations to implement Executive Order 13495, Nondisplacement of Qualified Workers Under Service Contracts. The Executive Order establishes a general policy of the Federal Government concerning service contracts and solicitations for service contracts for performance of the same or similar services at the same location. This policy mandates the inclusion of a contract clause requiring the successor contractor and its subcontractors to offer those employees employed under the predecessor contract, whose employment will be otherwise terminated as a result of the award of the successor contract, a right of first refusal of employment under the successor contract in positions for which they are qualified.

  1. Contracting as a Science

    DTIC Science & Technology

    2012-04-30

    behavioral research (3rd ed.). New York, NY: Holt, Reinhart & Winston. Kettl, D. F. (1993). Sharing power: Public governance and private markets . Washington...seek NPS faculty research supporting the interests of our program sponsors. Finally, we serve as a “broker” to market specific research topics...is a set of general philosophical assumptions, shared by researchers in a specific field or discipline, about the character of the world and how we

  2. Contracting As A Science

    DTIC Science & Technology

    2012-04-30

    behavioral research (3rd ed.). New York, NY: Holt, Reinhart & Winston. Kettl, D. F. (1993). Sharing power: Public governance and private markets . Washington...seek NPS faculty research supporting the interests of our program sponsors. Finally, we serve as a “broker” to market specific research topics...is a set of general philosophical assumptions, shared by researchers in a specific field or discipline, about the character of the world and how we

  3. A Study of Placing Army Requirements on Contract

    DTIC Science & Technology

    2016-04-01

    perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011

  4. 48 CFR 49.112-2 - Final payment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final payment. 49.112-2 Section 49.112-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.112-2 Final payment. (a) Negotiated settlement. After execution...

  5. 48 CFR 942.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Final indirect cost rates. 942.705 Section 942.705 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 942.705 Final indirect cost rates. ...

  6. 48 CFR 3442.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Final indirect cost rates. 3442.705 Section 3442.705 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 3442.705 Final indirect cost rates...

  7. Multi-KW dc distribution system technology research study

    NASA Technical Reports Server (NTRS)

    Dawson, S. G.

    1978-01-01

    The Multi-KW DC Distribution System Technology Research Study is the third phase of the NASA/MSFC study program. The purpose of this contract was to complete the design of the integrated technology test facility, provide test planning, support test operations and evaluate test results. The subjet of this study is a continuation of this contract. The purpose of this continuation is to study and analyze high voltage system safety, to determine optimum voltage levels versus power, to identify power distribution system components which require development for higher voltage systems and finally to determine what modifications must be made to the Power Distribution System Simulator (PDSS) to demonstrate 300 Vdc distribution capability.

  8. RAPTOR Transmissivity and Cloud Climatology Study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eis, K.E.; Vonder Haar, T.H.; Forsythe, J.

    1993-01-01

    The RAPTOR Transmissivity Study (RTS) was funded by Lawrence Livermore National Laboratory (LLNL) under a sub contract to support the U.S. Army`s RAPTOR program. The intent of the study is to answer two questions: (1) What are the typical transmission levels of clouds as a function of target altitude for two locations and wavelengths of interest? (2) What is the probability that a cloud will intervene between sensor and target for a given target altitude, range, wavelength and location? This was addressed for Iraq and Korea. Answers to both questions are treated using existing software and data sources where possiblemore » due to the limited funding and scope of the contract.« less

  9. Membrane Cholesterol in Skeletal Muscle: A Novel Player in Excitation-Contraction Coupling and Insulin Resistance

    PubMed Central

    Barrientos, G.; Sánchez-Aguilera, P.; Jaimovich, E.; Hidalgo, C.

    2017-01-01

    Membrane cholesterol is critical for signaling processes in a variety of tissues. We will address here current evidence supporting an emerging role of cholesterol on excitation-contraction coupling and glucose transport in skeletal muscle. We have centered our review on the transverse tubule system, a complex network of narrow plasma membrane invaginations that propagate membrane depolarization into the fiber interior and allow nutrient delivery into the fibers. We will discuss current evidence showing that transverse tubule membranes have remarkably high cholesterol levels and we will address how modifications of cholesterol content influence excitation-contraction coupling. In addition, we will discuss how membrane cholesterol levels affect glucose transport by modulating the insertion into the membrane of the main insulin-sensitive glucose transporter GLUT4. Finally, we will address how the increased membrane cholesterol levels displayed by obese animals, which also present insulin resistance, affect these two particular skeletal muscle functions. PMID:28367451

  10. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  11. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  12. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  13. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  14. 48 CFR 842.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Final indirect cost rates. 842.705 Section 842.705 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 842.705 Final indirect cost rates...

  15. Scientific Data Analysis and Software Support: Geodynamics

    NASA Technical Reports Server (NTRS)

    Klosko, Steven; Sanchez, B. (Technical Monitor)

    2000-01-01

    The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.

  16. Regulation of increased blood flow (hyperemia) to muscles during exercise: a hierarchy of competing physiological needs.

    PubMed

    Joyner, Michael J; Casey, Darren P

    2015-04-01

    This review focuses on how blood flow to contracting skeletal muscles is regulated during exercise in humans. The idea is that blood flow to the contracting muscles links oxygen in the atmosphere with the contracting muscles where it is consumed. In this context, we take a top down approach and review the basics of oxygen consumption at rest and during exercise in humans, how these values change with training, and the systemic hemodynamic adaptations that support them. We highlight the very high muscle blood flow responses to exercise discovered in the 1980s. We also discuss the vasodilating factors in the contracting muscles responsible for these very high flows. Finally, the competition between demand for blood flow by contracting muscles and maximum systemic cardiac output is discussed as a potential challenge to blood pressure regulation during heavy large muscle mass or whole body exercise in humans. At this time, no one dominant dilator mechanism accounts for exercise hyperemia. Additionally, complex interactions between the sympathetic nervous system and the microcirculation facilitate high levels of systemic oxygen extraction and permit just enough sympathetic control of blood flow to contracting muscles to regulate blood pressure during large muscle mass exercise in humans. Copyright © 2015 the American Physiological Society.

  17. Regulation of Increased Blood Flow (Hyperemia) to Muscles During Exercise: A Hierarchy of Competing Physiological Needs

    PubMed Central

    Joyner, Michael J.; Casey, Darren P.

    2015-01-01

    This review focuses on how blood flow to contracting skeletal muscles is regulated during exercise in humans. The idea is that blood flow to the contracting muscles links oxygen in the atmosphere with the contracting muscles where it is consumed. In this context, we take a top down approach and review the basics of oxygen consumption at rest and during exercise in humans, how these values change with training, and the systemic hemodynamic adaptations that support them. We highlight the very high muscle blood flow responses to exercise discovered in the 1980s. We also discuss the vasodilating factors in the contracting muscles responsible for these very high flows. Finally, the competition between demand for blood flow by contracting muscles and maximum systemic cardiac output is discussed as a potential challenge to blood pressure regulation during heavy large muscle mass or whole body exercise in humans. At this time, no one dominant dilator mechanism accounts for exercise hyperemia. Additionally, complex interactions between the sympathetic nervous system and the microcirculation facilitate high levels of systemic oxygen extraction and permit just enough sympathetic control of blood flow to contracting muscles to regulate blood pressure during large muscle mass exercise in humans. PMID:25834232

  18. Instrument to Measure Psychological Contract Violation in Pharmacy Students

    PubMed Central

    Wilkin, Noel E.; Bentley, John P.; Bouldin, Alicia S.; Wilson, Marvin C.; Holmes, Erin R.

    2010-01-01

    Objectives To adapt and evaluate an instrument that measures perceived psychological contract violations in pharmacy students by schools and colleges of pharmacy. Design A psychological contract violations measure was developed from existing literature and the 1997 ACPE Guidelines and pilot-tested with second-year pharmacy students at 2 schools of pharmacy. A revised measure then was administered to second-year pharmacy students at 6 schools of pharmacy. Using a 5-point Likert-type scale, participants were asked to indicate the level of obligations they received compared to what was promised by the school of pharmacy. Results Exploratory factor analysis on the psychological contract violations measure was conducted using principal components analysis resulting in 7 factors, which led to a revised measure with 26 items. Using a sample of 339 students, the proposed 7-factor measurement model was tested using confirmatory factor analysis. In general, the results supported the hypothesized model. The final 23-item scale demonstrated both reliability and validity. Some students perceived certain aspects of the psychological contract that exists with their school of pharmacy were being violated. Conclusion The psychological contract violations measure may serve as a valuable tool in helping to identify areas where their students believe that schools/colleges of pharmacy have not fulfilled promised obligations. PMID:21045949

  19. Observational study of contracts processing at 29 CTSA sites.

    PubMed

    Kiriakis, James; Gaich, Nicholas; Johnston, S Claiborne; Kitterman, Darlene; Rosenblum, Daniel; Salberg, Libby; Rifkind, Adam

    2013-08-01

    We measured contracts final negotiation (FN) and full execution (FE) times using shared definitions in a prospective observational study of management of contracts for clinical trials at 29 CTSA institutions. Median FN and FE times were reached in 39 and 91 days, respectively; mean times for FN and FE were 55 and 103 days, respectively. Individual site medians ranged from 3 to 116 days for FN and 34 to 197 days for FE. The use of master agreements (MAs) and previously negotiated terms (PNTs) was associated with significant reduction of FN times by a mean of 33 days (p < 0) and 22 days (p < 0.001), respectively. PNTs, but not MAs, were associated with significantly reduced FE time (22 days, p < 0.007). Gap analysis revealed a gap of 22 days between contracts negotiation and Institutional Review Board (IRB) review and intervals of 33 days (contracts) and 48 days (IRB review) during which the process steps were being conducted alone, suggesting a potential benefit with parallel processing. These baseline data support a plan to investigate root causes of prolonged study start-up time by examining causes of variation and outliers. © 2013 Wiley Periodicals, Inc.

  20. Observational Study of Contracts Processing at 29 CTSA Sites

    PubMed Central

    Kiriakis, James; Gaich, Nicholas; Johnston, S. Claiborne; Kitterman, Darlene; Salberg, Libby; Rifkind, Adam

    2013-01-01

    Abstract We measured contracts final negotiation (FN) and full execution (FE) times using shared definitions in a prospective observational study of management of contracts for clinical trials at 29 CTSA institutions. Median FN and FE times were reached in 39 and 91 days, respectively; mean times for FN and FE were 55 and 103 days, respectively. Individual site medians ranged from 3 to 116 days for FN and 34 to 197 days for FE. The use of master agreements (MAs) and previously negotiated terms (PNTs) was associated with significant reduction of FN times by a mean of 33 days (p < 0) and 22 days (p < 0.001), respectively. PNTs, but not MAs, were associated with significantly reduced FE time (22 days, p < 0.007). Gap analysis revealed a gap of 22 days between contracts negotiation and Institutional Review Board (IRB) review and intervals of 33 days (contracts) and 48 days (IRB review) during which the process steps were being conducted alone, suggesting a potential benefit with parallel processing. These baseline data support a plan to investigate root causes of prolonged study start‐up time by examining causes of variation and outliers. PMID:23919362

  1. [Claim and reality of selective contact options : experiences in finalizing selective contracts in urological care].

    PubMed

    Ex, P; Schroeder, A

    2014-08-01

    Selective contracts are an important component in addition to the total healthcare concept in order to introduce process-related innovations into the healthcare system. Since 2011 the Berufsverband der Deutschen Urologen (BDU, Professional Association of German Urologists) has held negotiations with individual health insurance companies and care providers in order to view selective contracts as collective contracts, not only as pilot projects but also as additional forms of care.This article illustrates the experiences of the BDU in the initiation and finalizing of selective contracts as well as existing weak points in the framework conditions.

  2. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  3. Outsourcing Operational Logistics: Buyer Beware

    DTIC Science & Technology

    2003-05-16

    This logistics system takes far too many people to conduct support missions and does not provide the desired customer performance in terms of...FINAL 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER OUTSOURCING OPERATIONAL LOGISTICS: BUYER BEWARE (U) 5b. GRANT NUMBER 5c...Form 298 (Rev. 8-98) 1 (Unclassified Paper) NAVAL WAR COLLEGE Newport, R.I. OUTSOURCING OPERATIONAL LOGISTICS: BUYER BEWARE By LAMONT WOODY Lieutenant

  4. Contract Support and Facilitation of Epidemic Outbreak Surveillance (EOS) Program Final Operating Capability (FOC)

    DTIC Science & Technology

    2007-08-01

    Community Acquired Pneumonia . The principal investigator is William Weisburg, Ph.D. of Nanogen, and the Medical College of Wisconsin (MCW) is a...captures the most important viruses involved in community - acquired respiratory infections: 1. Influenza A (fluA) 2. Influenza B (fluB) 3. Respiratory...Adenovirus subtype 4, Human Parainfluenza Virus 1, Human Parainfluenza Virus 2, Human Parainfluenza Virus 3, Human Metapneumovirus, Streptococcus pneumonia

  5. Operational Contract Support: Economic Impact Evaluation and Measures of Effectiveness

    DTIC Science & Technology

    2017-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES...DATES COVERED MBA professional report 4. TITLE AND SUBTITLE OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES OF EFFECTIVENESS 5...evaluation, expeditionary economics , operational contract support, measure of effectiveness 15. NUMBER OF PAGES 89 16. PRICE CODE 17. SECURITY

  6. Federal employees health benefits program; revision of contract cost principles and procedures, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The U.S. Office of Personnel Management (OPM) is issuing a final regulation amending the Federal Employees Health Benefits (FEHB) Acquisition Regulation (FEHBAR). This regulation provides additional contract cost principles and procedures for FEHB Program experience-rated contracts and is intended to clarify our requirements and enhance our oversight of FEHB carriers.

  7. Mitigating chromatic effects for the transverse focusing of intense charged particle beams

    NASA Astrophysics Data System (ADS)

    Mitrani, James; Kaganovich, Igor; Davidson, Ronald

    2013-09-01

    A final focusing scheme designed to minimize chromatic effects is discussed. Solenoids are often used for transverse focusing in accelerator systems that require a charged particle beam with a small focal spot and/or large energy density A sufficiently large spread in axial momentum will reduce the effectiveness of transverse focusing, and result in chromatic effects on the final focal spot. Placing a weaker solenoid upstream of a stronger final focusing solenoid (FFS) mitigates chromatic effects on transverse beam focusing. J.M. Mitrani et al., Nucl. Inst. Meth. Phys. Res. A (2013) http://dx.doi.org/10.1016/j.nima.2013.05.09 This work was supported by DOE contract DE-AC02-09CH11466.

  8. Flawed Execution: A Case Study on Operational Contract Support

    DTIC Science & Technology

    2016-06-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA JOINT APPLIED PROJECT FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT June 2016...applied project 4. TITLE AND SUBTITLE FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT 5. FUNDING NUMBERS 6. AUTHOR(S) Scott F...unlimited FLAWED EXECUTION: A CASE STUDY ON OPERATIONAL CONTRACT SUPPORT Scott F. Taggart, Captain, United States Marine Corps Jacob Ledford

  9. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  10. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  11. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  12. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  13. 24 CFR 242.52 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  14. 48 CFR 215.404-2 - Data to support proposal analysis.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Data to support proposal... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.404-2 Data to support proposal analysis. See PGI 215.404-2 for guidance on obtaining...

  15. 48 CFR 215.404-2 - Data to support proposal analysis.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Data to support proposal... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 215.404-2 Data to support proposal analysis. See PGI 215.404-2 for guidance on obtaining...

  16. 48 CFR 5152.245-9001 - Government property for installation support services (cost-reimbursement contracts).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... installation support services (cost-reimbursement contracts). 5152.245-9001 Section 5152.245-9001 Federal... CONTRACT CLAUSES 5152.245-9001 Government property for installation support services (cost-reimbursement contracts). As prescribed in 5145.302-3(S-91), insert the following clause: Government Property for...

  17. Cost and Schedule Analytical Techniques Development: Option 1

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  18. Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1

    NASA Technical Reports Server (NTRS)

    Estes, Ronald H. (Editor)

    1993-01-01

    This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.

  19. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  20. 48 CFR 15.404-2 - Data to support proposal analysis.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Data to support proposal analysis. 15.404-2 Section 15.404-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-2 Data to support proposal analysis. (a) Field pricing...

  1. Exchange relationships: examining psychological contracts and perceived organizational support.

    PubMed

    Coyle-Shapiro, Jacqueline A-M; Conway, Neil

    2005-07-01

    The authors surveyed 347 public sector employees on 4 measurement occasions to investigate the conceptual distinctiveness of the psychological contract and perceived organizational support (POS) and how they are associated over time. Results support the distinctiveness of the 2 concepts. In terms of their interrelationships over time, by drawing on psychological contract theory the authors found little support for a reciprocal relationship between POS and psychological contract fulfillment. Under an alternative set of hypotheses, by drawing on organizational support theory and by separating psychological contract fulfillment into its 2 components (perceived employer obligations and inducements), the authors found that perceived employer inducements were positively related to POS, which, in turn, was negatively related to perceived employer obligations. The results suggest that POS and the components of psychological contract fulfillment are more important in predicting organizational citizenship behavior than psychological contract fulfillment. Copyright 2005 APA, all rights reserved.

  2. 34 CFR 5.72 - Records available.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department or not. (c) Contracts. (1) Contract instruments. (2) Portions of offers reflecting final prices submitted in negotiated procurements. (d) Reports on grantee, contractor, or provider performance. Final... projects, such as films, computer software, other copyrightable materials and reports of inventions, will...

  3. 48 CFR 2027.305-3 - Follow-up by Government.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provide the following written determination before final payment and closeout of the contract: (1) No inventions or discoveries were made, (2) No copyrights were secured, produced, or composed, (3) No notices or... any final payment and closing out the contract. ...

  4. 48 CFR 42.702 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... estimated rates subject to adjustment during contract performance and at the time the final indirect cost....702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT... under this subpart provides— (1) Uniformity of approach with a contractor when more than one contract or...

  5. 48 CFR 42.702 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... estimated rates subject to adjustment during contract performance and at the time the final indirect cost....702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT... under this subpart provides— (1) Uniformity of approach with a contractor when more than one contract or...

  6. Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

  7. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235... involving research on live vertebrate animals. (b) Use the clause at 252.235-7003, Frequency Authorization...

  8. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235... involving research on live vertebrate animals. (b) Use the clause at 252.235-7003, Frequency Authorization...

  9. Manned Mars System Study (MMSS): Mars transportation and facility infrastructure study. Volume 2: Technical report

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Manned Mars System Study (MMSS) was conducted for the Marshall Space Flight Center (MSFC) over the 35 month period between May 15, 1987 and April 30, 1990. During the course of the study, the NASA Office of Exploration (OEXP; Code Z) was created and MSFC was subsequently designated the Transportation Integration Agent (TIA) for support of the OEXP Mission Analysis and Systems Engineering (MASE) team. As a result of this action, modifications to the contract redirected the efforts to be consistent with NASA's overall objectives, including lunar transportation system design. A large number of written submittals were required in order to provide TIA support to MASE. A list summarizing the documents which have been prepared and delivered by Martin Marietta under this contract during the course of this work is presented. In nearly all cases, full sets of view-graphs were also provided to the MSFC COTR, and in several cases magnetic media were provided as well. To incorporate all of these materials (more than 2,000 pages) into the present report would obviously produce an extremely unwieldy and confusing document. Therefore, a summary of key findings are presented in this final report, supplemented by other material produced under this contract but not already available in the widespread literature.

  10. Noxious electrical stimulation of the pelvic floor and vagina induces transient voiding dysfunction in a rabbit survival model of pelvic floor dystonia.

    PubMed

    Dobberfuhl, Amy D; Spettel, Sara; Schuler, Catherine; Levin, Robert M; Dubin, Andrew H; De, Elise J B

    2015-12-01

    Existing data supports a relationship between pelvic floor dysfunction and lower urinary tract symptoms. We developed a survival model of pelvic floor dysfunction in the rabbit and evaluated cystometric (CMG), electromyographic (EMG) and ambulatory voiding behavior. Twelve female adult virgin rabbits were housed in metabolic cages to record voiding and defecation. Anesthetized CMG/EMG was performed before and after treatment animals (n=9) received bilateral tetanizing needle stimulation to the pubococcygeous (PC) muscle and controls (n=3) sham needle placement. After 7 days all animals were subjected to tetanizing transvaginal stimulation and CMG/EMG. After 5 days a final CMG/EMG was performed. Of rabbits that underwent needle stimulation 7 of 9 (78%) demonstrated dysfunctional CMG micturition contractions versus 6 of 12 (50%) after transvaginal stimulation. Needle stimulation of the PC musculature resulted in significant changes in: basal CMG pressure, precontraction pressure change, contraction pressure, interval between contractions and postvoid residual; with time to 3rd contraction increased from 38 to 53 minutes (p=0.008 vs. prestimulation). Vaginal noxious stimulation resulted in significant changes in: basal CMG pressure and interval between contractions; with time to 3rd contraction increased from 37 to 46 minutes (p=0.008 vs. prestimulation). Changes in cage parameters were primarily seen after direct needle stimulation. In a majority of animals, tetanizing electrical stimulation of the rabbit pelvic floor resulted in voiding changes suggestive of pelvic floor dysfunction as characterized by a larger bladder capacity, longer interval between contractions and prolonged contraction duration.

  11. 48 CFR 242.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Final indirect cost rates. 242.705 Section 242.705 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 242...

  12. Federal employees health benefits acquisition regulation: Board of Contract Appeals. Final rule.

    PubMed

    2008-10-08

    The Office of Personnel Management (OPM) is adopting as final,without change, the proposed rule published April 7, 2008 to remove the designation of the Armed Services Board of Contract Appeals (ASBCA)from the Federal Employees Health Benefits Acquisition Regulation(FEHBAR).

  13. Federal Research and Development Contract Trends and the Supporting Industrial Base, 2000-2014

    DTIC Science & Technology

    2016-04-30

    Homeland Security, and government-wide services contracting trends; sourcing policy and cost estimation methodologies; and recent U.S. Army modernization ...been fears that the sharp downturn in federal contract obligations would disproportionately impact the R&D contracting portfolios within individual...329 - contracting portfolios , and the industrial base that supports those efforts, within each R&D contracting agency. The main finding of this

  14. Methods, Software and Tools for Three Numerical Applications. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. R. Jessup

    2000-03-01

    This is a report of the results of the authors work supported by DOE contract DE-FG03-97ER25325. They proposed to study three numerical problems. They are: (1) the extension of the PMESC parallel programming library; (2) the development of algorithms and software for certain generalized eigenvalue and singular value (SVD) problems, and (3) the application of techniques of linear algebra to an information retrieval technique known as latent semantic indexing (LSI).

  15. 32 CFR 158.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... routinely are put in place to provide support to many newly fielded weapons systems, including aircraft, land combat vehicles, and automated command and control systems. Systems support contracting authority... generally has less control over systems support contracts than other types of contracts. Theater business...

  16. 32 CFR 158.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... routinely are put in place to provide support to many newly fielded weapons systems, including aircraft, land combat vehicles, and automated command and control systems. Systems support contracting authority... generally has less control over systems support contracts than other types of contracts. Theater business...

  17. 32 CFR 158.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... routinely are put in place to provide support to many newly fielded weapons systems, including aircraft, land combat vehicles, and automated command and control systems. Systems support contracting authority... generally has less control over systems support contracts than other types of contracts. Theater business...

  18. Planning the Transition to Long-Term Stewardship for the River Corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cearlock, C.S.; Lerch, J.A.; Sands, J.P.

    2007-07-01

    Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less

  19. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracts for research and development. (d) Use the clause at 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and development. (e) Use the clause at 252.235-7004...

  20. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  1. Dual Support in Contract Workers' Triangular Employment Relationships

    ERIC Educational Resources Information Center

    Buch, Robert; Kuvaas, Bard; Dysvik, Anders

    2010-01-01

    This study investigated the interplay between perceived investment in contract worker development by the "client" organization and contract workers' perceived organizational support from their temporary employment "agency." A study among 2021 contract workers from three temporary employment agencies in Norway showed that the…

  2. 48 CFR 552.219-74 - Section 8(a) Direct Award.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracting activity shall give advance notice to SBA before it issues a final notice terminating performance... prior to processing any advance payments or novation agreements. The contracting activity may assign contract administration functions to a contract administration office. (c) The Contractor agrees: (1) To...

  3. Questionable payments for work of a contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-09-23

    Examination of three support contracts for international R and D disclosed fundamental weaknesses in DOE controls over the (1) receipt and acceptance of goods and services, (2) authorization and payments for work, and (3) analyses of price proposals submitted by the contractor. As a result of these weaknesses, there was no clear and convincing record of what DOE got for most of the $2.5 million it spent on these contracts. Neither was there a downward adjustment in the amounts paid by DOE under two of the contracts although such an adjustment was required by the contracts. Much of the workmore » done by the contractor was not properly authorized. Finally, analyses by the San Francisco Operations Office of certain of the price proposals submitted by the contractor did not ensure that DOE obtained a fair and reasonable price. Recommendations addressed these issues to the Procurement Office, the Controller, the Assistant Secretaries for Conservation and Renewable Energy and Fossil Energy, and the Manager, San Francisco Operations Office who indicated general agreement with the findings and a willingness to immediately pursue the remedial measure that were recommended. Their comments are appended.« less

  4. Final Report - BRER Core Support

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evan B. Douple

    2007-01-09

    This contract provided core support for activities of the advisory committee of experts comprising the Board on Radiation Effects Research (BRER), in The National Academies' Division on Earth and Life Studies. That committee met two times during the funding period. The committee members provided oversight and advice regarding ongoing BRER projects and also assisted in the identification of potential committee members for new studies and the development of proposals for projects in the radiation sciences worthy for future study. In addition, funding provided support for the planning, advertisement, and invited speakers' travel-expense reimbursement for the Third and Fourth Gilbert W.more » Beebe Symposia held at The National Academies on December 1, 2004 and on November 30, 2005, respectively.« less

  5. Final Report - Advanced Cathode Catalysts and Supports for PEM Fuel Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Debe, Mark

    2012-09-28

    The principal objectives of the program were development of a durable, low cost, high performance cathode electrode (catalyst and support), that is fully integrated into a fuel cell membrane electrode assembly with gas diffusion media, fabricated by high volume capable processes, and is able to meet or exceed the 2015 DOE targets. Work completed in this contract was an extension of the developments under three preceding cooperative agreements/grants Nos. DE-FC-02-97EE50473, DE-FC-99EE50582 and DE-FC36- 02AL67621 which investigated catalyzed membrane electrode assemblies for PEM fuel cells based on a fundamentally new, nanostructured thin film catalyst and support system, and demonstrated the feasibilitymore » for high volume manufacturability.« less

  6. Risk management. National Aeronautics and Space Administration (NASA). Interim rule adopted as final with changes.

    PubMed

    2000-11-22

    This is a final rule amending the NASA FAR Supplement (NFS) to emphasize considerations of risk management, including safety, security (including information technology security), health, export control, and damage to the environment, within the acquisition process. This final rule addresses risk management within the context of acquisition planning, selecting sources, choosing contract type, structuring award fee incentives, administering contracts, and conducting contractor surveillance.

  7. 77 FR 75780 - Nondisplacement of Qualified Workers Under Service Contracts; Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... of Qualified Workers Under Service Contracts; Effective Date AGENCY: Wage and Hour Division, Department of Labor. ACTION: Final rule; notice of effective date and OMB approval of information collection requirements. SUMMARY: The Department of Labor announces the effective date of its Final Rule published on...

  8. 48 CFR 42.707 - Cost-sharing rates and limitations on indirect cost rates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... final indirect cost rate ceiling in a contract. Examples of such circumstances are when the proposed... ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42... authorized, may call for the contractor to participate in the costs of the contract by accepting indirect...

  9. Evaluation of contract time estimation and contracting procedures for louisiana department of transportation and development construction projects : final report : volume I.

    DOT National Transportation Integrated Search

    1995-09-11

    The purpose of the research was to provide the Louisiana Department of Transportation and Development (LaDOTD) with a systematic approach to the determination of contract time and to explore innovative contracting procedures that may prove beneficial...

  10. 42 CFR 423.643 - Effect of contract determination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Effect of contract determination. 423.643 Section 423.643 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... Determinations and Appeals § 423.643 Effect of contract determination. The contract determination is final and...

  11. 42 CFR 422.646 - Effect of contract determination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Effect of contract determination. 422.646 Section 422.646 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN... Appeals § 422.646 Effect of contract determination. The contract determination is final and binding unless...

  12. 78 FR 7821 - Public Availability of Railroad Retirement Board FY 2012 Service Contract Inventory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .../files/omb/procurement/memo/service-contract-inventory-guidance.pdf . The Railroad Retirement Board has... analysis of its selected special interest functions from the FY 2012 Service Contract inventory, and finally (4) the analysis report on its FY 2011 Service Contract Inventory special interest functions, on...

  13. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  14. Daily Patterns of Life Stressors and Their Relation to Health.

    DTIC Science & Technology

    1981-03-01

    Daily Life Experience Mood Somatic Symptomatol ogy Z0. AIS3 PACT (Continue on veceree od*e If necessar and ident ify by block num~ber) This is the final...it was used in a 90 prospective study of daily experiences, mood, and somatic symptomatology. DD 1473 EDITION Of I NOV GS IS OBSOLETE ~4 ~ L S/N...Both contracts supported our studies exploring the effects of daily life experiences on mood and somatic symptomatology. Our work was divided into two

  15. Preparation of Hemoglobin-Containing Microcapsules.

    DTIC Science & Technology

    1982-04-01

    L -i2 801 PREPARRTION OF HEMOGLOBIN-CONTAINING MICROCAPSULES (U) i/i I SRI INTERNATIONAL MENLO PRK CA Z REYES APR 82 UNLSSFE SRI1-2254-2 DRMDi,7-8@-C...R oI• _ AD I PREPARATION OF HEMOGLOBIN- /2 o ) CONTAINING MICROCAPSULES . 00 ANNUAL AND FINAL REPORT ZOILA REYES, Ph.D. APRIL 1982 Supported by U.S...1/31/82) PREPARATION OF HEMOGLOBIN-CONTAINING MICROCAPSULES 6. PERFORMING ORG. REPOR’ NUMBER 2254-2 7. AUTHOR(s) 8. CONTRACT OR GRANT NUMBER(s) Zoila

  16. Evaluation of Short-Term Bioassays to Predict Functional Impairment. Selected Short-Term Pulmonary Toxicity Tests.

    DTIC Science & Technology

    1980-10-01

    Final Report .go Steve Drill, Richard Thomas "u0 C=00 October 1980 Xo- , Supported by U.S. ARMY MEDICAL RESEARCH AND DEVELOPMENT COMMAND .___ Fort...22102 S SEP 4 1981 30 D’ Contracting Officer’s Technical Representative: m Mary C. Henry, Ph.D. Z ~ U.S. ARMY MEDICAL BIOENGINEERING RESEARCH AND...myUEo.jt.scrt Ls.(1~ sea US. Ar Medical BlegeigResearch an Denclametsifiedn Fort Detrick13 W19OFP 5 Frederick, Maryland 21701 129_____________ 1

  17. Coronal Abundances and Their Variation

    NASA Technical Reports Server (NTRS)

    Saba, Julia L. R.

    1996-01-01

    This contract supported the investigation of elemental abundances in the solar corona, principally through analysis of high-resolution soft X-ray spectra from the Flat Crystal Spectrometer on NASA's Solar Maximum Mission. The goals of the study were a characterization of the mean values of relative abundances of elements accessible in the FCS data, and information on the extent and circumstances of their variability. This is the Final Report, summarizing the data analysis and reporting activities which occurred during the period of performance, June 1993 - December 1996.

  18. 48 CFR 915.404-2 - Information to support proposal analysis.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...

  19. 48 CFR 915.404-2 - Information to support proposal analysis.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...

  20. 48 CFR 915.404-2 - Information to support proposal analysis.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...

  1. 48 CFR 915.404-2 - Information to support proposal analysis.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Information to support proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2 Information to...

  2. 48 CFR 16.403 - Fixed-price incentive contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... relationship of total final negotiated cost to total target cost. The final price is subject to a price ceiling, negotiated at the outset. The two forms of fixed-price incentive contracts, firm target and successive targets, are further described in 16.403-1 and 16.403-2 below. (b) Application. A fixed-price incentive...

  3. 48 CFR 16.403 - Fixed-price incentive contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... relationship of total final negotiated cost to total target cost. The final price is subject to a price ceiling, negotiated at the outset. The two forms of fixed-price incentive contracts, firm target and successive targets, are further described in 16.403-1 and 16.403-2 below. (b) Application. A fixed-price incentive...

  4. 76 FR 13329 - Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ..., Release of Claims, for releases of claims under construction and building service contracts, was... prescribed the use of GSA Form 1142 for releases of claims under construction and building service contracts...] RIN 3090-AJ13 Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building...

  5. 77 FR 26763 - General Services Administration Acquisition Regulation; Submission for OMB Review; Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... Claims, regarding final payment under construction and building services contract. GSA Form 1142 was... construction and building services contractors to submit a release of claims before final payment is made to... (GSAR Parts 532 and 552.232-72; GSA Form 1142 Release of Claims) AGENCY: Office of the Chief Acquisition...

  6. Report on the Audit of Architect-Engineer Contracting at U.S. Army Engineer Division, Europe

    DTIC Science & Technology

    1991-02-13

    This is our final report on the Audit of Architect-Engineer Contracting at U.S. Army Engineer Division1 Europe, for your information and use...our ongoing audit of architect-engineer contracting. The Contract Management Directorate made the audit from March 1989 through February 1990. The audit covered

  7. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  8. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  9. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  10. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  11. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  12. Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development. volume 3; Program Cost estimates

    NASA Technical Reports Server (NTRS)

    McCurry, J. B.

    1995-01-01

    The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

  13. Performance-Based Logistics Contracts: A Basic Overview

    DTIC Science & Technology

    2005-11-01

    world. The Navy began using PBL contracts in 1999, and since then, contract managers have reported improved availability and reduced customer wait...4825 Mark Center Drive • Alexandria, Virginia 22311-1850 CRM D0012881.A2/Final November 2005 Performance-Based Logistics Contracts: A Basic Overview...Performance-Based Logistics (PBL) contracts provide services or sup- port where the provider is held to customer -oriented performance requirements

  14. The Air Force Needs to Improve Cost-Effectiveness and Availability of the Joint Surveillance Target Attack Radar System (Redacted)

    DTIC Science & Technology

    2016-11-01

    Target Attack Radar System Objective We determined whether the Air Force made cost-effective purchases on the performance-based logistics contract to... contract to Northrop Grumman Corporation to provide Total System Support Responsibility services to sustain 16 E-8C JSTARS aircraft. These services...customer support. The Total System Support Responsibility contract is valued at $7 billion, with a 6-year base period and 16 annual contract option

  15. The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract

    DTIC Science & Technology

    2017-03-07

    H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee

  16. 77 FR 41809 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ..., Lockheed Martin IS&GS, Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO 80112-3938. Activity..., Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO 80112-3938. Activity for Which Permit Is.... Applicant: Celia Lang, Lockheed Martin IS&GS, Antarctic Support Contract, 7400 S. Tucson Way, Centennial, CO...

  17. Actions by the Bonneville Power Administration to Implement the Long- Term Contracting Provisions of P.L. 96-501

    DTIC Science & Technology

    1981-09-04

    begin necessary negotiations for initial long-term contracts. Third, the term "offer" is not defined in the Act. Under general contract law , a valid...The position that the Administrator must offer coplete and definite contracts within 9 months of December 5, 1980, is supported by general contract law definitions...conititute "offers" in contract law . This interpretation is supported by Williston, who states that an offer is always a conditional promise, which wll

  18. Medicare program; hospital outpatient prospective payment system and CY 2007 payment rates; CY 2007 update to the ambulatory surgical center covered procedures list; Medicare administrative contractors; and reporting hospital quality data for FY 2008 inpatient prospective payment system annual payment update program--HCAHPS survey, SCIP, and mortality. Final rule with comment period and final rule.

    PubMed

    2006-11-24

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system, and to implement certain related provisions of the Medicare Prescription Drug, Improvement, and Modernization Act (MMA) of 2003 and the Deficit Reduction Act (DRA) of 2005. In this final rule with comment period, we describe changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the prospective payment system. These changes are applicable to services furnished on or after January 1, 2007. In addition, this final rule with comment period implements future CY 2009 required reporting on quality measures for hospital outpatient services paid under the prospective payment system. This final rule with comment period revises the current list of procedures that are covered when furnished in a Medicare-approved ambulatory surgical center (ASC), which are applicable to services furnished on or after January 1, 2007. This final rule with comment period revises the emergency medical screening requirements for critical access hospitals (CAHs). This final rule with comment period supports implementation of a restructuring of the contracting entities responsibilities and functions that support the adjudication of Medicare fee-for-service (FFS) claims. This restructuring is directed by section 1874A of the Act, as added by section 911 of the MMA. The prior separate Medicare intermediary and Medicare carrier contracting authorities under Title XVIII of the Act have been replaced with the Medicare Administrative Contractor (MAC) authority. This final rule continues to implement the requirements of the DRA that require that we expand the "starter set" of 10 quality measures that we used in FY 2005 and FY 2006 for the hospital inpatient prospective payment system (IPPS) Reporting Hospital Quality Data for the Annual Payment Update (RHQDAPU) program. We began to adopt expanded measures effective for payments beginning in FY 2007. In this rule, we are finalizing additional quality measures for the expanded set of measures for FY 2008 payment purposes. These measures include the HCAHPS survey, as well as Surgical Care Improvement Project (SCIP, formerly Surgical Infection Prevention (SIP)), and Mortality quality measures.

  19. Tool development in threat assessment: syntax regularization and correlative analysis. Final report Task I and Task II, November 21, 1977-May 21, 1978. [Linguistic analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miron, M.S.; Christopher, C.; Hirshfield, S.

    1978-05-01

    Psycholinguistics provides crisis managers in nuclear threat incidents with a quantitative methodology which can aid in the determination of threat credibility, authorship identification and perpetrator apprehension. The objective of this contract is to improve and enhance present psycholinguistic software systems by means of newly-developed, computer-automated techniques which significantly extend the technology of automated content and stylistic analysis of nuclear threat. In accordance with this overall objective, the first two contract Tasks have been completed and are reported on in this document. The first Task specifies the development of software support for the purpose of syntax regularization of vocabulary to rootmore » form. The second calls for the exploration and development of alternative approaches to correlative analysis of vocabulary usage.« less

  20. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    DTIC Science & Technology

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  1. 77 FR 18106 - Award Fee for Service and End-Item Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    .... SUMMARY: NASA has adopted, without change, a final rule amending the NASA FAR Supplement (NFS) to update the Award Fee for Service Contracts clause (NFS 1852.216-76) to clarify that the amount of award fee... Award Fee for End-Item Contracts clause (NFS 1852.216-77) to allow the contracting officer to withhold...

  2. 78 FR 48716 - Notice of Availability of the Final Environmental Impact Statement for the Arkansas Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Reservoir to store up to 29,938 acre-feet of water. A long-term storage contract, rather than short-term... Availability of the Final Environmental Impact Statement for the Arkansas Valley Conduit and Long-Term Excess... Valley Conduit (AVC) and Long-Term Excess Capacity Contract, Fryingpan-Arkansas Project, Colorado, is...

  3. 75 FR 18113 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...

  4. Navigational Strategies of Migrating Monarch Butterflies

    DTIC Science & Technology

    2014-11-10

    AFRL-OSR-VA-TR-2014-0339 NAVIGATIONAL STRATEGIES OF MIGRATING MONARCH BUTTERFLIES Steven Reppert UNIVERSITY OF MASSACHUSETTS Final Report 11/10/2014...Final Progress Statement to (Dr. Patrick Bradshaw) Contract/Grant Title: Navigational Strategies of Migrating Monarch Butterflies Contract...Grant #: FA9550-10-1-0480 Reporting Period: 01-Sept-10 to 31-Aug-14 Overview of accomplishments: Migrating monarch butterflies (Danaus

  5. 25 CFR 256.20 - How are these repairs or construction trades persons, home building contractors, or construction...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... statement of work, which identifies the work to be performed. The appropriate contracting office uses the... completing the project as advertised. (a) Payments to the winning bidder are negotiated in the contract and... the completed work. (2) Final payment will be made after final inspection and after all provisions of...

  6. Weighing the Contract Option.

    ERIC Educational Resources Information Center

    Dervarics, Charles

    1993-01-01

    Contracting for noneducational services is standard operating procedure in many school districts. Private contractors are involved in transportation, food service, maintenance, and even, in rare cases, instruction. Before deciding to contract out, school boards should examine improvement to school-run operations before making a final decision.…

  7. Whither Performance Contracting?

    ERIC Educational Resources Information Center

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  8. Rocket Propulsion 21 Steering Committee Meeting (RP21) NASA In-Space Propulsion Update

    NASA Technical Reports Server (NTRS)

    Klem, Mark

    2015-01-01

    In-house Support of NEXT-C Contract Status Thruster NEXT Long Duration Test post-test destructive evaluation in progress Findings will be used to verify service life models identify potential design improvements Cathode heater fabrication initiated for cyclic life testing Thruster operating algorithm definition verification initiated to provide operating procedures for mission users High voltage propellant isolator life test voluntarily terminated after successfully operating 51,200 h Power processor unit (PPU) Replaced all problematic stacked multilayer ceramic dual inline pin capacitors within PPU Test bed Rebuilt installed discharge power supply primary power board Completed full functional performance characterization Final test report in progress Transferred PPU Testbed to contractor to support prototype design effort.

  9. Sustaining Financial Support through Workforce Development Grants and Contracts

    ERIC Educational Resources Information Center

    Brumbach, Mary A.

    2005-01-01

    Workforce development grants and contracts are important methods for sustaining financial support for community colleges. This chapter details decision factors, college issues, possible pitfalls, and methods for procuring and handling government contracts and grants for workforce training.

  10. Analysis of EDP performance

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The objective of this contract was the investigation of the potential performance gains that would result from an upgrade of the Space Station Freedom (SSF) Data Management System (DMS) Embedded Data Processor (EDP) '386' design with the Intel Pentium (registered trade-mark of Intel Corp.) '586' microprocessor. The Pentium ('586') is the latest member of the industry standard Intel X86 family of CISC (Complex Instruction Set Computer) microprocessors. This contract was scheduled to run in parallel with an internal IBM Federal Systems Company (FSC) Internal Research and Development (IR&D) task that had the goal to generate a baseline flight design for an upgraded EDP using the Pentium. This final report summarizes the activities performed in support of Contract NAS2-13758. Our plan was to baseline performance analyses and measurements on the latest state-of-the-art commercially available Pentium processor, representative of the proposed space station design, and then phase to an IBM capital funded breadboard version of the flight design (if available from IR&D and Space Station work) for additional evaluation of results. Unfortunately, the phase-over to the flight design breadboard did not take place, since the IBM Data Management System (DMS) for the Space Station Freedom was terminated by NASA before the referenced capital funded EDP breadboard could be completed. The baseline performance analyses and measurements, however, were successfully completed, as planned, on the commercial Pentium hardware. The results of those analyses, evaluations, and measurements are presented in this final report.

  11. Yucca Mountain Project Integrated Data System (IDS); Final report, October 1, 1989--December 31, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1991-05-23

    This final report for LANL Subcontract 9-XS8-2604-1 includes copies of all formal letters, memorandums, and reports provided by CAG to support the IDS effort in the LANL Test Managers Office, Las Vegas, Nevada from October 1, 1989 through the end of the contract on December 31, 1990. The material is divided into two sections; the Functional Requirements Document (FRD) and other reports, letters, and memorandums. All documents are arranged in chronological order with most recent last. Numerous draft copies of the FRD were prepared and cover sheets for all drafts are included. The complete text of only the last versionmore » supplied (July 27, 1990) is included in this document.« less

  12. 77 FR 43780 - Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour Contracts and Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour Contracts and Orders AGENCIES... changing the scope of work for a time-and-materials (T&M) or labor-hour (LH) contract or order. DATES...-043, ``Time-and-Materials and Labor-Hour Contracts for Commercial Items'', was published as a final...

  13. Cost and Schedule Analytical Techniques Development: Option 2 Year

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  14. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    DTIC Science & Technology

    2016-09-01

    education/ training , communication, staff levels, oversight, and leadership support by comparing and contrasting Army COR contract administration...processes from a CONUS and OCONUS perspective. The results inform Army Contracting leadership about differences and discrepancies that exist in the training ...five common COR issues that need to be addressed: education/ training , communication, staff Levels, oversight, and leadership support. We found that

  15. Effective Team Support: From Task and Cognitive Modeling to Software Agents for Time-Critical Complex Work Environments

    NASA Technical Reports Server (NTRS)

    Remington, Roger W. (Technical Monitor); John, Bonnie E.; Sycara, Katia

    2005-01-01

    The purpose of this research contract was to perform multidisciplinary research between CMU psychologists, computer scientists and NASA researchers to design a next generation collaborative system to support a team of human experts and intelligent agents. To achieve robust performance enhancement of such a system, we had proposed to perform task and cognitive modeling to thoroughly understand the impact technology makes on the organization and on key individual personnel. Guided by cognitively-inspired requirements, we would then develop software agents that support the human team in decision making, information filtering, information distribution and integration to enhance team situational awareness. During the period covered by this final report, we made substantial progress in completing a system for empirical data collection, cognitive modeling, and the building of software agents to support a team's tasks, and in running experiments for the collection of baseline data.

  16. How Can We Best Achieve Contracting Unity of Effort in the CENTCOM Area of Responsibility?

    DTIC Science & Technology

    2013-12-01

    3  2.  Literature Review ................................................................................3  3.  Interview Design and...2010, JCC-I/A was re- designated as the Central Command Joint Theater Support Contracting Command (C-JTSCC). Although the military has used...provision of integrated contracted support and management of contractor personnel providing that support to the joint force in a designated operational

  17. Contract for Manpower and Personnel Research and Studies (COMPRS) for the U.S. Army Research Institute for the Behavioral and Social Sciences (ARI) - Final Annual Report: Year Five

    DTIC Science & Technology

    1998-07-01

    Communications Objectives Measurement System (ACOMS)." The utility of the Fishbein and Ajzen theories of reasoned action within the context of military...conceptual model that applied the Fishbein and Ajzen concepts to enlistment intentions and behaviors, through an exploratory analysis of the variables...first-term Army enlisted attrition. In support of this long-term effort, ASA M &RA sponsored Phase I of a research program modeled after ARI’s broad

  18. Sodium-sulfur battery development. Phase VB final report, October 1, 1981--February 28, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1985-04-01

    This report describes the technical progress made under Contract No. DE-AM04-79CH10012 between the U.S. Department of Energy, Ford Aerospace & Communications Corporations and Ford Motor Company, for the period 1 October 1981 through 28 February 1985, which is designated as Phase VB of the Sodium-Sulfur Battery Development Program. During this period, Ford Aerospace held prime technical responsibility and Ford Motor Company carried out supporting research. Ceramatec, Inc., was a major subcontractor to Ford Aerospace for electrolyte development and production.

  19. Payload spin assembly for the commercial Titan launch vehicle

    NASA Technical Reports Server (NTRS)

    Robinson, Wilf; Pech, Greg

    1991-01-01

    A contract was completed to design, build, and test a Payload Spin Assembly (PSA) for installation onto the Martin Marietta Titan 3 Commercial launch vehicle. This assembly provides launch support for satellite payloads up to 5783 kilograms (6.37 tons) and controls release, spin-up, and final separation of the satellite from the second stage. Once separated, the satellite's Perigee Kick Motor (PKM) boosts the satellite into its transfer orbit. The first successful flight occurred December 31, 1989. Requirements, design, test, and problems associated with this mechanical assembly are discussed.

  20. Development of Technologies to Utilize Laser Plasma Radiations Sources for Radiation Effects Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, J F

    2007-01-31

    This final report will cover work performed over the period of November 11, 2005 to September 30, 2006 on the contract to develop technologies using laser sources for radiation effects sciences. The report will discuss four topic areas; the laser source experiments on the Gekko Laser at Osaka, Japan, planning for the Charge State Freeze Out experiments to be performed in calendar year 2007, a review of previous xenon gasbags on the LANL Trident laser to provide planning support to the May-June 2007 HELEN experiments.

  1. Isolated drops from capillary jets by means of Gaussian wave packets

    NASA Astrophysics Data System (ADS)

    Garcia, Francisco Javier; Gonzalez, Heliodoro; Castrejon-Pita, Alfonso Arturo; Castrejon-Pita, Jose Rafael; Gomez-Aguilar, Francisco Jose

    2017-11-01

    The possibility of obtaining isolated drops from a continuous liquid jet through localized velocity perturbations is explored analytically, numerically and experimentally. We show that Gaussian wave packets are appropriate for this goal. A temporal linear analysis predicts the early evolution of these wave packets and provides an estimate of the breakup length of the jet. Non-linear numerical simulations allow us both to corroborate these results and to obtain the shape of the surface of the jet prior to breakup. Finally, we show experimental evidence that stimulating with a Gaussian wave packet can lead to the formation of an isolated drop without disturbing the rest of the jet. The authors acknowledge support from the Spanish Government under Contract No. FIS2014-25161, the Junta de Andalucia under Contract No. P11-FQM-7919, the EPSRC-UK via the Grant EP/P024173/1, and the Royal Society.

  2. 75 FR 22706 - Defense Federal Acquisition Regulation Supplement; Service Contract Surveillance (DFARS Case 2008...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to ensure that the requirement for a quality assurance surveillance plan is addressed for each contract with a dollar value above the simplified acquisition threshold, and that contracts for services have appropriate performance management or surveillance plans prepared for the work being performed under the contract.

  3. Motor training reduces surround inhibition in the motor cortex.

    PubMed

    Akkad, Haya; Di Stasio, Flavio; Tibold, Robert; Kassavetis, Panagiotis; Rothwell, John C; Edwards, Mark J

    2016-06-01

    Surround inhibition (SI) is thought to facilitate focal contraction of a hand muscle by keeping nearby muscles silent. Unexpectedly, SI is reduced in skilled pianists. We tested whether repeated practice of focal contraction in non-pianists could reduce SI. Motor-evoked potentials were elicited by transcranial magnetic stimulation in the relaxed abductor digiti minimi randomly at the onset and 5s after offset of a 2s focal contraction (10% maximum) of the first dorsal interosseous (FDI). Over 5 blocks of 40 trials participants obtained points for increasing contraction speed and stability in FDI. In a final block, the interval between contractions was varied randomly to increase attention to the task. Over the first 5 blocks, SI declined as performance (points scored) improved. In the final "attention" block SI increased towards baseline without affecting performance. Although SI may be useful during the early stages of learning, skilled focal finger movement does not require SI to prevent activity in non-involved muscles. This could be due to better targeting of the excitatory command to move. Results from the final block suggest that increased attention can re-engage SI when task parameters change. SI is not necessary for successful focal contraction, but may contribute during learning and during attention to task. Copyright © 2016 International Federation of Clinical Neurophysiology. Published by Elsevier Ireland Ltd. All rights reserved.

  4. 77 FR 13508 - Certainty of Terms of Service Contracts and NVOCC Service Arrangements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... in a service contract with a carrier, although their experience with such index- linked contracts is... adjust based upon an index reflecting changes in market conditions. DATES: The Final Rule is effective March 7, 2012. FOR FURTHER INFORMATION CONTACT: Karen V. Gregory, Secretary, Federal Maritime Commission...

  5. 39 CFR 601.109 - Contract claims and disputes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: INTELLECTUAL PROPERTY RIGHTS OTHER THAN PATENTS PURCHASING OF PROPERTY AND SERVICES § 601.109 Contract claims... decision on a claim, and even when the supplier does not agree to use ADR, the contracting officer should... issuance of a final decision. (c) Supplier claim initiation. Supplier claims must be submitted in writing...

  6. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  7. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  8. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  9. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  10. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement... types. These rates shall, as a minimum, be established to cover the estimated average daily construction... proportional share, as used in this section, is the ratio of the final contract construction costs eligible for...

  11. An Analysis Of Cyber Security And How It Is Affecting A Contract Writing System, Seaport

    DTIC Science & Technology

    2016-06-01

    CONTRACT WRITING SYSTEM, SEAPORT June 2016 By: Bill Turner Daniel Belcher Danielle Allen Advisors: Raymond Jones Stacy McQuage...A CONTRACT WRITING SYSTEM, SEAPORT 5. FUNDING NUMBERS 6. AUTHOR(S) Bill Turner, Daniel Belcher, & Danielle Allen 7. PERFORMING ORGANIZATION NAME(S...business support for the DOD—specifically, the contract writing system SeaPort. Is cybersecurity becoming too restrictive, making the ability to support the

  12. Preaward Evaluation and Responsibility Determination of Foreign Contractors.

    DTIC Science & Technology

    1988-12-01

    abroad. In fiscal year 1987 (FY 87) alone more than $2.1 billion in DOD contracts (exclusive of subsistence, petroleum, construction and support services...dollars. More than $1.1 billion in DOD contracts and subcontracts (exclusive of subsistence, petroleum, construction and support services) were awarded to...Germany, in FY 87 [Ref. 21. Significant amounts in construction and base services contracts are also awarded yearly to support American troops stationed

  13. Reactions to psychological contract breaches and organizational citizenship behaviours: An experimental manipulation of severity.

    PubMed

    Atkinson, Theresa P; Matthews, Russell A; Henderson, Alexandra A; Spitzmueller, Christiane

    2018-01-30

    Grounded in affective events theory, we investigated the effects of experimentally manipulated psychological contract breaches on participants' feelings of violation, subsequent perceptions of psychological contract strength, and organizational citizenship behaviours in a sample of working adults. Results support previous findings that pre-existing relational psychological contract strength interacts with severity of unmet promises or expectations. Specifically, individuals with high relational contracts who experience low severity of unmet promises/expectations have the lowest breach perceptions, whereas individuals with high relational contracts who experience more severe levels unmet promises/expectations experience the highest level of breach perceptions. Results also support the concept of a breach spiral in that prior perceptions of breach led to an increased likelihood of subsequent perceptions of breach following the experimental manipulation. Furthermore, consistent with affective events theory, results support the argument that a psychological contract breach's effect on specific organizational citizenship behaviours is mediated by feelings of violation and the reassessment of relational contracts. These effects were present even after controlling for the direct effects of the manipulated severity of unmet promises/expectations. Copyright © 2018 John Wiley & Sons, Ltd.

  14. 48 CFR 52.212-4 - Contract Terms and Conditions-Commercial Items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... issue a demand for payment to the Contractor upon finding a debt is due under the contract. (iii) Final... days; (B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the...

  15. 77 FR 72738 - Contracts and Provider Agreements for State Home Nursing Home Care

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... State Home Nursing Home Care AGENCY: Department of Veterans Affairs. ACTION: Interim final rule. SUMMARY... into contracts or provider agreements with State homes for the nursing home care of certain disabled... submitted in response to ``RIN 2900-AO57--Contracts and Provider Agreements for State Home Nursing Home Care...

  16. Alternative contracting research : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Alternative contracting methods have become popular alternatives to the traditional practice whose emphasis is on low bid acquisition. The benefits of decreased project schedule, increased job quality, and improved delivery process have demonstrated ...

  17. NAVSUP Global Logistics Support

    DTIC Science & Technology

    2012-08-01

    Support $3.5 M Ill SB Contracting Actions Ill SB Value 35% of total spend to Small Business ! NAVAL SUPPLY SYSTEMS COMMAND • Procurement • Barge...Other services now using as well • Awarded Aug 2011, Features: • 100% Sma II Business Set Aside ! • 25 multiple award task order contracts to 8...UP- GLOBAL LOGISTICS I · -~ --; •• ~.c. SUPPORT ,.. NAVAL SUPPLY SYSTEMS COMMAND Fiscal Year 2011 Small Business Contracting Spend: 28,000 actions

  18. Evaluation of Subcontract Price Proposals

    DTIC Science & Technology

    1990-04-09

    This is the final report on the Audit of the Evaluation of Subcontract Price Proposals. Comments on a draft of this report were considered in...preparing the final report. We made the audit from October 1987 through May 198% The initial objectives of the audit were to evaluate procedures used by...assist audit reports were used by procurement contracting officers in negotiating contract prices. During the audit , we expanded our objectives to

  19. Medicare program; revisions to the Medicare Advantage and Part D prescription drug contract determinations, appeals, and intermediate sanctions processes. Final rule with comment period.

    PubMed

    2007-12-05

    This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.

  20. Medicaid Integrity Program; eligible entity and contracting requirements for the Medicaid Integrity audit program. Final rule.

    PubMed

    2008-09-26

    Section 1936 of the Social Security Act (the Act) (as added by section 6034 of the Deficit Reduction Act of 2005 (DRA) established the Medicaid Integrity Program to promote the integrity of the Medicaid program by requiring CMS to enter into contracts with eligible entities to: (1) Review the actions of individuals or entities furnishing items or services (whether on a fee-for-service, risk, or other basis) for which payment may be made under an approved State plan and/or any waiver of such plan approved under section 1115 of the Act; (2) audit claims for payment of items or services furnished, or administrative services rendered, under a State plan; (3) identify overpayments to individuals or entities receiving Federal funds; and (4) educate providers of services, managed care entities, beneficiaries, and other individuals with respect to payment integrity and quality of care. This final rule will provide requirements for an eligible entity to enter into a contract under the Medicaid integrity audit program. The final rule will also establish the contracting requirements for eligible entities. The requirements will include procedures for identifying, evaluating, and resolving organizational conflicts of interest that are generally applicable to Federal acquisition and procurement; competitive procedures to be used; and procedures under which a contract may be renewed.

  1. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information... information technology services or support services. [61 FR 41470, Aug. 8, 1996. Redesignated at 62 FR 274...

  2. 48 CFR 17.206 - Evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contracting officer. An example of a circumstance that may support a determination not to evaluate offers for... 17.206 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 17.206 Evaluation. (a) In awarding the basic contract...

  3. Highly accurate adaptive finite element schemes for nonlinear hyperbolic problems

    NASA Astrophysics Data System (ADS)

    Oden, J. T.

    1992-08-01

    This document is a final report of research activities supported under General Contract DAAL03-89-K-0120 between the Army Research Office and the University of Texas at Austin from July 1, 1989 through June 30, 1992. The project supported several Ph.D. students over the contract period, two of which are scheduled to complete dissertations during the 1992-93 academic year. Research results produced during the course of this effort led to 6 journal articles, 5 research reports, 4 conference papers and presentations, 1 book chapter, and two dissertations (nearing completion). It is felt that several significant advances were made during the course of this project that should have an impact on the field of numerical analysis of wave phenomena. These include the development of high-order, adaptive, hp-finite element methods for elastodynamic calculations and high-order schemes for linear and nonlinear hyperbolic systems. Also, a theory of multi-stage Taylor-Galerkin schemes was developed and implemented in the analysis of several wave propagation problems, and was configured within a general hp-adaptive strategy for these types of problems. Further details on research results and on areas requiring additional study are given in the Appendix.

  4. 48 CFR 243.204-70-6 - Allowable profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-6 Allowable profit. When the final price of an unpriced change order is negotiated after a substantial portion...

  5. 48 CFR 243.204-70-6 - Allowable profit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-6 Allowable profit. When the final price of an unpriced change order is negotiated after a substantial portion...

  6. 48 CFR 46.707 - Pricing aspects of fixed-price incentive contract warranties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 46.707 Pricing aspects of... the total final price. Contractor compliance with the warranty after the establishment of the total...

  7. 48 CFR 46.707 - Pricing aspects of fixed-price incentive contract warranties.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 46.707 Pricing aspects of... the total final price. Contractor compliance with the warranty after the establishment of the total...

  8. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  9. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  10. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  11. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  12. 48 CFR 1816.405-271 - Base fee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... For other contracts, such as those for hardware or software development, the procurement officer may... during the life of the contract at defined intervals on a provisional basis. If the final award fee...

  13. 10 CFR 950.36 - Other contract matters in dispute.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contract matter in dispute. (2) If the parties cannot reach a resolution of the matter in disagreement... the parties reach agreement through mediation, the agreement shall constitute a Final Agreement on the...

  14. 48 CFR 1842.7201 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management Reports, the NASA form 533 series, is required on cost-type, price redetermination, and fixed... implemented in the contract based on the estimated final contract value at the time of award. [62 FR 14017...

  15. Science Innovation Through Industry Partnership: Lessons from AMPERE in Bridging the Federal Sponsor/Private Corporation Divide

    NASA Astrophysics Data System (ADS)

    Anderson, B. J.; Korth, H.; Erlandson, R. E.

    2017-12-01

    The Active Magnetosphere and Planetary Electrodynamics Response Experiment (AMPERE) was made possible by harnessing an fortuitous capability of the Iridium Communications constellation of 70 polar orbiting satellites. In 1996 it was realized that the attitude magnetometers on-board the Iridium satellites, then in fabrication, could potentially be used to obtain the first ever global and continuous measurements of the Birkeland currents with a sufficiently short re-sampling cadence (10 minutes) to track the dynamic evolution of the large-scale currents. The experience of taking this idea from 1996 through various research grant supported efforts, mission of opportunity proposal attempts, and finally through funding and implementation as a National Science Foundation geospace facility, revealed a number of challenges both in proposing innovative solutions to existing sponsor programs and also in working between the federal sponsor community and the private commercial space environment. Implementing AMPERE required a code change to on-board software on the Iridium satellites and it proved necessary to engage NASA to adjust the solicitation language to allow AMPERE. For NASA proposals we also encountered a conflict with respect to federal sponsorship such that the original business configuration of Iridium could not accept the accounting regime implied by a sub-contract derived from a federal contract acquisition. Subsequent mission of opportunity efforts encountered various other challenges including the cancellation of an explorer to fund the exploration initiative in 2001. The facilities proposal to NSF was almost not submitted owing a funding vehicle disparity between the preferred proposer structure (contract) vs NSF's requirement to fund only grants and a final hurdle concerned the structure of the contract with Iridium which was initially a sub-contract but was changed to a fixed-price data purchase due to NSF's limitations on funding fee-bearing engineering services. More general differences in the federal procurement timeline versus the corporate decision making timeline were also encountered. These lessons in the industry/federal partnership for innovative science are discussed as they may offer guidance for future efforts.

  16. GSFC Supplier Surveillance

    NASA Technical Reports Server (NTRS)

    Kelly, Michael P.

    2011-01-01

    Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)

  17. Department of Defense’s Waiver of Competitive Prototyping Requirement for Enhanced Polar System Program

    DTIC Science & Technology

    2012-08-23

    objectives. Finally, the CAPS acquisition strategy anticipates the use of a cost- reimbursement contract for designing and building the system...The CAPS acquisition strategy anticipates the use of a cost- reimbursement contract for designing and building the system; however, it may be... reimbursement contract was chosen for the basic CAPS contract because of the nature of the design work, which includes software design and development

  18. Isoflavones isolated from red clover (Trifolium pratense) inhibit smooth muscle contraction of the isolated rat prostate gland.

    PubMed

    Brandli, A; Simpson, J S; Ventura, S

    2010-09-01

    This study investigated whether red clover contains any bioactive constituents which may affect contractility of rat prostatic smooth muscle in an attempt to determine whether its medicinal use in the treatment of benign prostatic hyperplasia is supported by pharmacological effects. A commercially available red clover extract was chemically fractionated and various isoflavones (genistein, formononetin and biochanin A) were isolated from these fractions and their effects on contractility were examined on preparations of the isolated rat prostate gland. Contractile effects of the isolated fractions were compared with commercially available isoflavones (genistein, formononetin and biochanin A). Pharmacological tools were used to investigate the mechanism of action modifying smooth muscle contraction. Crude red clover extract (Trinovin) inhibited electrical field stimulation induced contractions of the rat prostate across a range of frequencies with an IC(50) of approximately 68 microg/ml. Contractions of the rat prostate elicited by exogenous administration of acetylcholine, noradrenaline or adenosine 5'-triphosphate (ATP) were also inhibited. Chromatographic separation, and final purification by high performance liquid chromatography (HPLC) permitted the isolation of the isoflavones: daidzein, calycosin, formononetin, prunetin, pratensin, biochanin A and genistein. Genistein, formononetin and biochanin A (100 microM) from either commercial sources or isolated from red clover extract inhibited electrical field stimulation induced contractions of the isolated rat prostate. It is concluded that isoflavones contained in red clover are able to inhibit prostatic smooth muscle contractions in addition to their antiproliferative effects. However, the high concentrations required to observe these smooth muscle relaxant effects mean that a therapeutic benefit from this mechanism is unlikely at doses used clinically. Crown Copyright 2010. Published by Elsevier GmbH. All rights reserved.

  19. The New Jersey Department of Higher Education's Health Manpower Planning Contract. Final Comprehensive Report.

    ERIC Educational Resources Information Center

    Tomson, Jon; Vasilenko, Patricia

    This report of the New Jersey Department of Higher Education's Health Manpower Planning Contract describes project activities and assessment methods and models, presents data on employment supply and demand, and provides samples of questionnaires and forms that were used. The department was required under contract to: survey and evaluate pertinent…

  20. Traffic Aware Strategic Aircrew Requests (TASAR) Analysis and Development

    NASA Technical Reports Server (NTRS)

    Woods, Sharon E.

    2016-01-01

    This document is the final report and deliverable 30 of Contract No. NNL12AA06C, the Traffic Aware Strategic Aircrew Requests (TASAR) contract awarded via the NASA Research Announcement (NRA). It documents the accomplishments of the contract, the evolution of its role in the overall TASAR project, and lessons learned from its execution.

  1. Titan 4 TPS Replacement Implementation Study

    NASA Technical Reports Server (NTRS)

    Jackson, Charles H.

    1996-01-01

    This final report documents the overall progress of the study. It is a general discussion of the documents reviewed, recommendations, trips taken, findings/observations, and proposed corrective actions. In addition, cost data for the contract is addressed. The normal abstract and executive summary provided with most final reports is also provided as a part of this report. A conclusion section is provided that addresses the relative completeness of the Titan 4 TPSR project and this contract.

  2. Final Technical Report for contract number DE-FG02-05ER15670

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glazebrook, Jane

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  3. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  4. 48 CFR 3004.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Supporting closeout documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND... Contract Files 3004.804-570 Supporting closeout documents. (a) When applicable and prior to contract...

  5. 48 CFR 3004.804-570 - Supporting closeout documents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Supporting closeout documents. 3004.804-570 Section 3004.804-570 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND... Contract Files 3004.804-570 Supporting closeout documents. (a) When applicable and prior to contract...

  6. 48 CFR 17.601 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 17.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.601 Definition. Management..., maintenance, or support, on its behalf, of a Government-owned or -controlled research, development, special...

  7. Commerical Remote Sensing Data Contract

    USGS Publications Warehouse

    ,

    2005-01-01

    The U. S. Geological Survey's (USGS) Commercial Remote Sensing Data Contracts (CRSDCs) provide government agencies with access to a broad range of commercially available remotely sensed airborne and satellite data. These contracts were established to support The National Map partners, other Federal Civilian agency programs, and Department of Defense programs that require data for the United States and its territories. Experience shows that centralized procurement of remotely sensed data leads to considerable cost savings to the Federal government through volume discounts, reduction of redundant contract administrative costs, and avoidance of duplicate purchases. These contracts directly support the President's Commercial Remote Sensing Space Policy, signed in 2003, by providing a centralized mechanism for civil agencies to acquire commercial remote sensing products to support their mission needs in an efficient and coordinated way. CRSDC administration is provided by the USGS Mid-Continent Mapping Center in Rolla, Missouri.

  8. Interleaved arrays antenna technology development

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Phase one and two of a program to further develop and investigate advanced graphite epoxy waveguides, radiators, and components with application to space antennas are discussed. The objective of the two phases were to demonstrate mechanical integrity of a small panel of radiators and parts procured under a previous contract and to develop alternate designs and applications of the technology. Most of the emphasis was on the assembly and test of a 5 x 5 element module. This effort was supported by evaluation of adhesives and waveguide joint configurations. The evaluation and final assembly considered not only mechanical performance but also producibility in large scale.

  9. Adaptation of a Hyperspectral Atmospheric Correction Algorithm for Multi-spectral Ocean Color Data in Coastal Waters. Chapter 3

    NASA Technical Reports Server (NTRS)

    Gao, Bo-Cai; Montes, Marcos J.; Davis, Curtiss O.

    2003-01-01

    This SIMBIOS contract supports several activities over its three-year time-span. These include certain computational aspects of atmospheric correction, including the modification of our hyperspectral atmospheric correction algorithm Tafkaa for various multi-spectral instruments, such as SeaWiFS, MODIS, and GLI. Additionally, since absorbing aerosols are becoming common in many coastal areas, we are making the model calculations to incorporate various absorbing aerosol models into tables used by our Tafkaa atmospheric correction algorithm. Finally, we have developed the algorithms to use MODIS data to characterize thin cirrus effects on aerosol retrieval.

  10. SXI Prototype mirror mount

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This final report describes the work performed from June 1993 to January 1995. The purpose of this contract was to provide optomechanical engineering and fabrication support to the Solar X-ray Imager (SXI) program in the areas of mirror, optical bench and camera assemblies of the telescope. The Center for Applied Optics (CAO) worked closely with the Optics and S&E technical staff of MSFC to develop and investigate the most viable and economical options for the design and fabrication of a number of parts for the various telescope assemblies. All the tasks under this delivery order have been successfully completed within budget and schedule.

  11. Opto-mechanical support services. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This subcontract was for Optomec`c support of the Los Alamos National Laboratory`s (LANL`s) Group MEE-12 in the technical specialty area of opto-mechanical design, engineering and fabrication. Two individual tasks were defined by MEE-12 and completed by Optomec personnel. Edward J. Yavornik acted as Principal Investigator on the Wire and Fluorescent Fiber Offset Grid (WAFFOG) for the Neutral Particle Beam (NPB) GTA (Ground Test Accelerator) Experiment, and Thomas Swann acted as Principal Investigator on the ESS-7 Photometers Project. Some hardware was procured/fabricated for the ESS-7 Photometer task, however, most of the work consisted of design and engineering support resulting in drawingsmore » and specifications which were prepared by MEE-12 personnel. There were no technical papers or patents generated by Optomec personnel as a result of this work, and all work defined in the contract was completed.« less

  12. International Ultraviolet Explorer Observatory operations

    NASA Technical Reports Server (NTRS)

    1985-01-01

    This volume contains the final report for the International Ultraviolet Explorer IUE Observatory Operations contract. The fundamental operational objective of the International Ultraviolet Explorer (IUE) program is to translate competitively selected observing programs into IUE observations, to reduce these observations into meaningful scientific data, and then to present these data to the Guest Observer in a form amenable to the pursuit of scientific research. The IUE Observatory is the key to this objective since it is the central control and support facility for all science operations functions within the IUE Project. In carrying out the operation of this facility, a number of complex functions were provided beginning with telescope scheduling and operation, proceeding to data processing, and ending with data distribution and scientific data analysis. In support of these critical-path functions, a number of other significant activities were also provided, including scientific instrument calibration, systems analysis, and software support. Routine activities have been summarized briefly whenever possible.

  13. When Disaster Strikes Is Logistics and Contracting Support Ready?

    DTIC Science & Technology

    2011-09-27

    improve response in the event of an actual crisis . The Defense Contingency Contracting Handbook (Christianson, A., Coombs , J., Harbin, S., Ingram...AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT Recent crisis responses, including the...and management of the DoD?s logistics and contracting support for contingency, expeditionary, and crisis response, and provide specific recommendations

  14. 2016 availability and disparity study : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    The study examined whether there was a level playing field for minority- and women-owned firms in the Montana transportation : contracting marketplace and for MDT contracting. This information helps MDT set an overall goal for Disadvantage Business :...

  15. Teacher Views on Organizational Support and Psychological Contract Violation

    ERIC Educational Resources Information Center

    Argon, Türkan; Ekinci, Serkan

    2017-01-01

    This study aimed to determine the relationship between secondary school teachers' view regarding Organizational Support and Psychological Contract Violation. The study conducted with relational screening model included 230 secondary school teachers employed in Bolu central district in 2014-2015 academic year. Perceived Organizational Support Scale…

  16. Medicare and state health care programs: fraud and abuse, civil money penalties and intermediate sanctions for certain violations by health maintenance organizations and competitive medical plans--HHS. Final rule.

    PubMed

    1994-07-15

    This final rule implements sections 9312(c)(2), 9312(f), and 9434(b) of Public Law 99-509, section 7 of Public Law 100-93, section 4014 of Public Law 100-203, sections 224 and 411(k)(12) of Public Law 100-360, and section 6411(d)(3) of Public Law 101-239. These provisions broaden the Secretary's authority to impose intermediate sanctions and civil money penalties on health maintenance organizations (HMOs), competitive medical plans, and other prepaid health plans contracting under Medicare or Medicaid that (1) substantially fail to provide an enrolled individual with required medically necessary items and services; (2) engage in certain marketing, enrollment, reporting, or claims payment abuses; or (3) in the case of Medicare risk-contracting plans, employ or contract with, either directly or indirectly, an individual or entity excluded from participation in Medicare. The provisions also condition Federal financial participation in certain State payments on the State's exclusion of certain prohibited entities from participation in HMO contracts and waiver programs. This final rule is intended to significantly enhance the protections for Medicare beneficiaries and Medicaid recipients enrolled in a HMO, competitive medical plan, or other contracting organization under titles XVIII and XIX of the Social Security Act.

  17. Insurance Contract Analysis for Company Decision Support in Acquisition Management

    NASA Astrophysics Data System (ADS)

    Chernovita, H. P.; Manongga, D.; Iriani, A.

    2017-01-01

    One of company activities to retain their business is marketing the products which include in acquisition management to get new customers. Insurance contract analysis using ID3 to produce decision tree and rules to be decision support for the insurance company. The decision tree shows 13 rules that lead to contract termination claim. This could be a guide for the insurance company in acquisition management to prevent contract binding with these contract condition because it has a big chance for the customer to terminate their insurance contract before its expired date. As the result, there are several strong points that could be the determinant of contract termination such as: 1) customer age whether too young or too old, 2) long insurance period (above 10 years), 3) big insurance amount, 4) big amount of premium charges, and 5) payment method.

  18. 48 CFR 2015.305 - Proposal evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection Processes and Techniques 2015.305 Proposal evaluation. The contracting officer may provide offerors' cost proposals and supporting financial...

  19. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    DTIC Science & Technology

    2008-02-01

    liabilities (e.g., accounts payable). This ratio can be compared to the firm’s weighted average cost of capital ( WACC ). WACC is the cost of debt plus the cost...RatioCost of Debt Marginal Tax Rate Risk-Free Rate Cost of Equity Risk Premium Industry Beta WACC Technical Risk CPFF/CPAF …. FFP/ MYP - Contract Choice...estimates the levered WACC as the discount rate, and finally calculates the NPV of the contract. Specific model input includes profit policy levers

  20. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    DTIC Science & Technology

    2009-02-01

    cost of capital ( WACC ). WACC is the cost of debt plus the cost of equity both weighted by the market values debt and equity, respectively. The cost...Beta WACC Technical Risk CPFF/CPAF …. FFP/ MYP - Contract Choice (FAR 16.1) Margin – (p = f(NBV, n, α, risk)) Payments (α) FCOM ( = f(NBV, Treasury...projections, layers on the profit and contract financing policy, estimates the levered WACC as the discount rate, and finally calculates the NPV of the

  1. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  2. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  3. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  4. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  5. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  6. Systems Integration, Analysis and Modeling Support to the HEDS Technology/Commercialization Initiative (HTCI)

    NASA Technical Reports Server (NTRS)

    Feingold, Harvey; ONeil, Dan (Technical Monitor)

    2002-01-01

    In response to a recommendation from OMB, NASA's Fiscal Year 2001 budget included a new program within the HEDS (Human Exploration and Development of Space) Enterprise called HEDS Technology/ Commercialization Initiative (HTCI). HTCI had three overarching goals: to support REDS analysis and planning for safe, affordable and effective future programs and projects that advance human exploration, scientific discovery, and the commercial development of space; to pursue research, development, and validation of breakthrough technologies and highly innovative systems concepts; and to advance die creation of strong partnerships within NASA, with U.S. industry and universities, and internationally. As part of its contracted effort, SAIC was to write a report contribution, describing die results of its task activities, to a final HTCI report prepared by MSFC. Unfortunately, government cancellation of the HTCI program in the summer of 2001 curtailed all efforts on the program including die Final HTCI report. In the absence of that report, SAIC has issued this final report in an attempt to document some of the technical material it produced. The report contains SAIC presentations for both HTCI workshops; a set of roadmap charts for the Systems Analysis, Integration and Modeling; and charts showing the evolution of the current TITAN modeling architecture.

  7. Analysis of Factors That Have Influenced Outcomes of Battles and Wars: A Data Base of Battles and Engagements. Volume 1. Main Report. Selected Battles 1600 - 1973.

    DTIC Science & Technology

    1984-09-01

    Harms, Assistant Director for Management Support, and LT% Mike Deems, who was the Contracting Officer’s Representative for the HERO contract. COMMENTS...A1ND gJESTIONS may be directed to US Army Concep*s Aialysis Agency, ATTN: Assistint Director for Management Support, 8120 .uodriont Avenue, Bethesda...APPENDIX A STUDY CONTRIBUTORS 1. STUDY TEAM. Management and Support Directorate. Report Author: Lelma M. Harms Contract COTR: LTC J. M. Deems 2. EXTERNAL

  8. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  9. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  10. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  11. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  12. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  13. Triage Decision Trees and Triage Protocols: Changing Strategies for Medical Rescue in Civilian Mass Casualty Situations.

    DTIC Science & Technology

    1984-02-06

    MASS CASUALTY SITUATIONS FINAL REPORT for 0O FEDERAL EMERGENCY MANAGEMENT AGENCY WASHINGTON, D.C. 20472 FEMA CONTRACT NUMBER EMW-C-1202 e FEMA WORK UNIT...20006 FINAL REPORT for FEDERAL EMERGENCY MANAGEMENT AGENCY WASHINGTON, D.C. 20472 FEMA CONTRACT NUMBER EMW-C-1202 FEMA WORK UNIT NUMBER 2412G...February 1984 This repnrt has been reviewed in the Federal Emergency Management Agency and approved for publication. Approval does not signify that the

  14. An Investigation into the Nature of Non-Voiding Contractions Resulting from Detrusor Hyperreflexia in Neurogenic Bladders Following Spinal Cord Injury

    DTIC Science & Technology

    2015-06-01

    occasioned by numerous, rhythmic high pressure non-voiding contractions (NVC) during normal bladder filling. These NVC are responsible for incontinence...month experiment period) 2c. Final data analysis (data analysis will be ongoing throughout, this will represent the finalization of data period, 0.25...Sub-Tasks 2a and 2b. As of 9/2/14, we have completed much of the data analysis (Sub-Task 2c; see below for results). Analysis of abdominal

  15. Claims for Unabsorbed Overhead on Defense Contracts.

    DTIC Science & Technology

    1985-09-01

    coat which, under the provisions of any pertinent law, regulation, or contract, cannot be included in prices, cost reimbureements , or settlements...ruled that the contractor was due some reimbursement . " - Allegheny appealed the contracting officer’s determination a second time questioning how much...amount of reimbursement . The final opinion also added the cost that was substantiated for replacement of operators and make-up pay. Therefore, the

  16. 24 CFR 882.403 - ACC, housing assistance payments contract, and lease.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... DIRECT LOAN PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE... contracted for is the total of the Moderate Rehabilitation Fair Market Rents for all the units. The fee for...

  17. 32 CFR 158.4 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...

  18. 32 CFR 158.4 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...

  19. 32 CFR 158.4 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... program management processes during applicable contingency operations. (2) Comply with applicable U.S..., “Policy and Procedures for Determining Workforce Mix.” (4) Fully consider, plan for, integrate, and execute acquisition of, contracted support, including synchronizing and integrating contracted support...

  20. Age 60 study, part III : consolidated database experiments final report.

    DOT National Transportation Integrated Search

    1994-10-01

    This document is one of four products completed as a part of the Age 60 Rule research contract monitored by Pam Della Rocco, Civil Aerospace Medical Institute, Contracting Officer's Technical Representative. This work was performed. This report was a...

  1. 48 CFR 42.603 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Responsibilities. (a) The CACO shall perform, on a corporate-wide basis, the contract administration functions as designated by the responsible agency. Typical CACO functions include (1) the determination of final indirect cost rates for cost-reimbursement contracts, (2) establishment of advance agreements or recommendations...

  2. ERIC Review: The Impact of Financial Crisis on Access and Support Services in Community Colleges.

    ERIC Educational Resources Information Center

    Sheldon, Caroline Q.

    2003-01-01

    Discusses the impact of fiscal contraction on community colleges. Explores how reduced state appropriations have adversely affected community college instruction and student support systems. Research shows that because instruction and student support services suffer when budget is reduced, fiscal contraction can hamper the ability of colleges to…

  3. Influence of curing mode with a LED unit on polymerization contraction kinetics and degree of conversion of dental resin-based materials.

    PubMed

    Mortier, Eric; Simon, Yorick; Dahoun, Abdelsellam; Gerdolle, David

    2009-01-01

    The purpose of this study was to evaluate the influence of photopolymerization mode with a light emitting diode (LED) lamp on the curing contraction kinetics and degree of conversion of 3 resin-based restorative materials. The curing contraction kinetics of Admira (ADM), Filtek P60 (P60), and Filtek Flow (FLO) were measured by the glass slide method. The materials were exposed to light from a 1,000 mW/cm-(2) power LED lamp (Elipar Freelight 2) in 3 modes: 2 continuous modes of 20 and 40 seconds (C20 and C40), and 1 exponential mode (E20; 5 seconds of exponential power increase followed by 15 seconds of maximum intensity). The degree of conversion (DC) was measured for each of the materials, and each of the modes by Fourier transformed infra-red spectrometry. P60 had the significantly lowest final contraction and FLO the highest among all light exposure modes. The C20 and C40 modes did not produce any difference in contraction or degree of conversion. The E20 mode led to a significant slowing of contraction speed combined with greater final contraction. Use of a LED lamp (1,000 mW/cm2) in continuous mode reduces the exposure time by half for identical curing shrinkage and degree of conversion.

  4. 76 FR 18189 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ...: Professional Contract Services, Inc., Austin, TX. Contracting Activity: Dept of the Army, XR W40M Natl Region Contract OFC, Washington, DC. Service Type/Location: Prime Vendor Support for Foreign Military Sales...

  5. Biomedical engineering support. Final report, June 15, 1971--June 30, 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolff, W.J.; Sandquist, G.; Olsen, D.B.

    On June 15, 1971 the Institute for Biomedical Engineering at the University of Utah contracted with the USAEC to provide biomedical support for an Artificial Heart Program. The goal of the program was to conceive, design, construct and test a prototype artificial heart system powered by an implantable radioisotope heat source. The system would serve as a total artificial heart for animal experiments and for studies directed at developing a total heart replacement system for humans. The major responsibilities of the Institute during the eight year contract period were to design, construct and test all blood handling components of themore » system and prove in vivo accommodation, performance and adequacy of the system in experimental animals. Upon completion of development of the Implantable Version of the Bench Model Blood Pump, a long series of comprehensive in vitro and in vivo experiments were conducted. In vivo experiments with the system conducted in calves demonstrated the general accommodation, adequate performance and good capacity to sustain the calf as a heart model for up to 36 days. During the more successful in vivo experiments the implanted calves were able to eat, drink, stand, exercise on a treadmill, and exhibited normal blood chemistry and pulmonary function.« less

  6. 41 CFR 60-30.30 - Final Administrative Order.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requiring the contractor to provide whatever remedies are appropriate, and imposing whatever sanctions are... in the immediate cancellation, termination and suspension of the respondent's contracts and/or debarment of the respondent from further contracts. [61 FR 19988, May 3, 1996] Expedited Hearing Procedures...

  7. 46 CFR 154.432 - Expansion and contraction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Membrane Tanks § 154.432 Expansion and contraction. The support system of a membrane tank must allow for thermal and physical expansion and contraction of the tank. Semi-Membrane Tanks ... 46 Shipping 5 2011-10-01 2011-10-01 false Expansion and contraction. 154.432 Section 154.432...

  8. 46 CFR 154.432 - Expansion and contraction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Membrane Tanks § 154.432 Expansion and contraction. The support system of a membrane tank must allow for thermal and physical expansion and contraction of the tank. Semi-Membrane Tanks ... 46 Shipping 5 2010-10-01 2010-10-01 false Expansion and contraction. 154.432 Section 154.432...

  9. 29 CFR 4.163 - Section 4(c) of the Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...

  10. 29 CFR 4.163 - Section 4(c) of the Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...

  11. 29 CFR 4.163 - Section 4(c) of the Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...

  12. 29 CFR 4.163 - Section 4(c) of the Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... their support contracts. Thus, specific contract requirements from one contract may be broken out and... substantially the same job classifications, the predecessor contract which covers the greater portion of the... bargaining agreement. However, failure to include in the wage determination any job classification, wage rate...

  13. 48 CFR 1552.209-74 - Limitation of future contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... an equal basis with other companies. (b) The Contractor will be ineligible to enter into a contract... subcontract under an EPA contract, which supports EPA's performance of Superfund Headquarters policy work... contract requires access to proprietary or confidential business or financial data of other companies, and...

  14. 48 CFR 1022.7000 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MINORITY AND WOMEN INCLUSION Fair inclusion of minorities and women 1022.7000 Contract clause. Insert the clause at 1052.222-70, Minority and Women Inclusion, in all solicitations and contracts in support of...

  15. LSST Telescope and Optics Status

    NASA Astrophysics Data System (ADS)

    Krabbendam, Victor; Gressler, W. J.; Andrew, J. R.; Barr, J. D.; DeVries, J.; Hileman, E.; Liang, M.; Neill, D. R.; Sebag, J.; Wiecha, O.; LSST Collaboration

    2011-01-01

    The LSST Project continues to advance the design and development of an observatory system capable of capturing 20,000 deg2 of the sky in six wavebands over ten years. Optical fabrication of the unique M1/M3 monolithic mirror has entered final front surface optical processing. After substantial grinding to remove 5 tons of excess glass above the M3 surface, a residual of a single spin casting, both distinct optical surfaces are now clearly evident. Loose abrasive grinding has begun and polishing is to occur during 2011 and final optical testing is planned in early 2012. The M1/M3 telescope cell and internal component designs have matured to support on telescope operational requirements and off telescope coating needs. The mirror position system (hardpoint actuators) and mirror support system (figure actuator) designs have developed through internal laboratory analysis and testing. Review of thermal requirements has assisted with definition of a thermal conditioning and control system. Pre-cooling the M1/M3 substrate will enable productive observing during the large temperature swing often seen at twilight. The M2 ULE™ substrate is complete and lies in storage waiting for additional funding to enable final optical polishing. This 3.5m diameter, 100mm thick meniscus substrate has been ground to within 40 microns of final figure. Detailed design of the telescope mount, including subflooring, has been developed. Finally, substantial progress has been achieved on the facility design. In early 2010, LSST contracted with ARCADIS Geotecnica Consultores, a Santiago based engineering firm to lead the formal architectural design effort for the summit facility.

  16. Review of Department Identified Contracts and Grants for Public Relations Services. Final Inspection Report. ED-OIG/I13-F0012

    ERIC Educational Resources Information Center

    US Department of Education, 2005

    2005-01-01

    The objective of this inspection was to review the materials produced under 20 contracts and 15 grants issued by the Department of Education (Department) to determine whether any of the contracts and grants resulted in covert propaganda. It has been concluded that none of the grants resulted in covert propaganda under the existing guidance of the…

  17. Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines

    DTIC Science & Technology

    2016-07-01

    ARL-TR-7706 ● JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether...JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines by...YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) July 2016 2. REPORT TYPE Final 3. DATES COVERED (From - To) Fiscal Year 2013 4. TITLE

  18. NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Wong, Wayne A.

    2015-01-01

    A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

  19. An optimization modeling approach to awarding large fire support wildfire helicopter contracts from the US Forest Service

    Treesearch

    Stephanie A. Snyder; Keith D. Stockmann; Gaylord E. Morris

    2012-01-01

    The US Forest Service used contracted helicopter services as part of its wildfire suppression strategy. An optimization decision-modeling system was developed to assist in the contract selection process. Three contract award selection criteria were considered: cost per pound of delivered water, total contract cost, and quality ratings of the aircraft and vendors....

  20. Mechanisms test bed math model modification and simulation support

    NASA Technical Reports Server (NTRS)

    Gilchrist, Andrea C.; Tobbe, Patrick A.

    1995-01-01

    This report summarizes the work performed under contract NAS8-38771 in support of the Marshall Space Flight Center Six Degree of Freedom Motion Facility and Flight Robotics Laboratory. The contract activities included the development of the two flexible body and Remote Manipulator System simulations, Dynamic Overhead Target Simulator control system and operating software, Global Positioning System simulation, and Manipulator Coupled Spacecraft Controls Testbed. Technical support was also provided for the Lightning Imaging Sensor and Solar X-Ray Imaging programs. The cover sheets and introductory sections for the documentation written under this contract are provided as an appendix.

  1. 48 CFR 217.173 - Multiyear contracts for weapon systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... weapon systems. 217.173 Section 217.173 Federal Acquisition Regulations System DEFENSE ACQUISITION... Mulityear Contracting 217.173 Multiyear contracts for weapon systems. As authorized by 10 U.S.C. 2306b(h... contract for— (a) A weapon system and associated items, services, and logistics support for a weapon system...

  2. 26 CFR 1.141-5 - Private loan financing test.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... lease or other contractual arrangement (for example, a management contract or an output contract) may in... person. Similarly, an output contract or a management contract with respect to a financed facility... (2) Updates or maintenance or support services with respect to computer software; and (B) The same...

  3. 48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...

  4. 48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...

  5. 48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...

  6. 48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA solicitation... Contracts-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer... for on-site support services where emergency evacuations of the NASA installation may occur, e.g...

  7. 48 CFR 5145.302-3 - Other contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Other contracts. 5145.302... REGULATIONS GOVERNMENT PROPERTY 5145.302-3 Other contracts. (S-90)(1) When it is determined that contractor... installation support services contracts, is in the best interest of the Government, the Government facilities...

  8. Improvements Needed in the Oversight of the Medical-Support Services and Award-Fee Processes under the Camp As Sayliyah, Qatar, Base Operations Support Services Contract

    DTIC Science & Technology

    2013-06-26

    in the Contract 5 Army Regulation Contradicts Federal Acquisition Regulation Requirement 6 Medical Malpractice Liability...to reflect the requirements in FAR subpart 37.4. Medical Malpractice Liability Transferred to the Government By allowing the ASG-QA command...surgeon to supervise the contractor physician assistants, contracting officials may have transferred the risk of liability for medical 7 malpractice

  9. Project Management and Systems Engineering Guide. Second Edition

    DTIC Science & Technology

    1989-09-30

    depend on the type of requirement. In general, opera- tional requirements will fall into one of the following categories : 1. Replacement of an existing...Warranty service and maintenance contracts also fall into this support category . The planning for phase-in type support must be accomplished during the...fixed-price incentive (FPI). The second general category of contracts is cost reimbursement. Under a cost- type contract, the product is not paid for on

  10. 14 CFR 17.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Administrator of the Federal Aviation Administration. (e) Alternative Dispute Resolution (ADR) is the primary... issuance of a Contracting Officer final decision. Contract disputes for purposes of ADR only may also... communication or the use of ADR. The Default Adjudicative Process is conducted by a DRO or Special Master...

  11. 48 CFR 31.202 - Direct costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.202 Direct... amount as an indirect cost if the accounting treatment— (1) Is consistently applied to all final cost... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Direct costs. 31.202...

  12. 48 CFR 42.704 - Billing rates.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Billing rates. 42.704... CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42.704 Billing rates. (a) The contracting... final indirect cost rates also shall be responsible for determining the billing rates. (b) The...

  13. 48 CFR 42.704 - Billing rates.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Billing rates. 42.704... CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42.704 Billing rates. (a) The contracting... final indirect cost rates also shall be responsible for determining the billing rates. (b) The...

  14. 48 CFR 42.704 - Billing rates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Billing rates. 42.704... CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42.704 Billing rates. (a) The contracting... final indirect cost rates also shall be responsible for determining the billing rates. (b) The...

  15. 48 CFR 42.704 - Billing rates.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Billing rates. 42.704... CONTRACT ADMINISTRATION AND AUDIT SERVICES Indirect Cost Rates 42.704 Billing rates. (a) The contracting... final indirect cost rates also shall be responsible for determining the billing rates. (b) The...

  16. 48 CFR 1552.242-72 - Financial administrative contracting officer.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Negotiate advance agreements applicable to treatment of costs and to Independent Research & Development/Bid and Proposal costs. (3) Negotiate changes to interim billing rates and establish final indirect cost... contracting officer. 1552.242-72 Section 1552.242-72 Federal Acquisition Regulations System ENVIRONMENTAL...

  17. North American study on contracting snow and ice response : final report.

    DOT National Transportation Integrated Search

    2017-01-01

    Snow and ice control operations are a vital function often conducted by state and local transportation agencies. Many states are choosing to contract snow and ice response services, instead of or in addition to the use of in-house forces, to maintain...

  18. Molecular Shocks Associated with Massive Young Stars: CO Line Images with a New Far-Infrared Spectroscopic Camera on the Kuiper Airborne Observatory

    NASA Technical Reports Server (NTRS)

    Watson, Dan M.

    1997-01-01

    Under the terms of our contract with NASA Ames Research Center, the University of Rochester (UR) offers the following final technical report on grant NAG 2-958, Molecular shocks associated with massive young stars: CO line images with a new far-infrared spectroscopic camera, given for implementation of the UR Far-Infrared Spectroscopic Camera (FISC) on the Kuiper Airborne Observatory (KAO), and use of this camera for observations of star-formation regions 1. Two KAO flights in FY 1995, the final year of KAO operations, were awarded to this program, conditional upon a technical readiness confirmation which was given in January 1995. The funding period covered in this report is 1 October 1994 - 30 September 1996. The project was supported with $30,000, and no funds remained at the conclusion of the project.

  19. Final Report. Baseline LAW Glass Formulation Testing, VSL-03R3460-1, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muller, Isabelle S.; Pegg, Ian L.; Gan, Hao

    2015-06-18

    The major objective of the baseline glass formulation work was to develop and select glass formulations that are compliant with contractual and processing requirements for each of the LAW waste streams. Other objectives of the work included preparation and characterization of glasses with respect to the properties of interest, optimization of sulfate loading in the glasses, evaluation of ability to achieve waste loading limits, testing to demonstrate compatibility of glass melts with melter materials of construction, development of glass formulations to support ILAW qualification activities, and identification of glass formulation issues with respect to contract specifications and processing requirements.

  20. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 2

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The Alternate Propulsion Subsystem Concepts contract had five tasks defined for the first year. The tasks were: F-1A Restart Study, J-2S Restart Study, Propulsion Database Development, Space Shuttle Main Engine (SSME) Upper Stage Use, and CER's for Liquid Propellant Rocket Engines. The detailed study results, with the data to support the conclusions from various analyses, are being reported as a series of five separate Final Task Reports. Consequently, this volume only reports the required programmatic information concerning Computer Aided Design Documentation, and New Technology Reports. A detailed Executive Summary, covering all the tasks, is also available as Volume 1.

  1. Understanding Variability in the AVIRIS-Derived Parameters from Vegetation Cover

    NASA Technical Reports Server (NTRS)

    Goetz, Alexander F. H.

    2000-01-01

    This project was carried out in two phases, the first was an investigation of the possible sources of variability in the canopy leaf chemistry parameters derived from AVERJS data on a year-to-year basis, and the second was a follow-on effort to improve the atmospheric correction program ATREM as well as to provide support to the community on the use of ATREM. This final report embodies a general review of the results obtained over the life of the contract as well as detailed interim reports and copies of the six papers published in AVIRIS Workshop Proceedings over the last 3 years.

  2. Improving the efficiency of the Finite Temperature Density Matrix Renormalization Group method

    NASA Astrophysics Data System (ADS)

    Nocera, Alberto; Alvarez, Gonzalo

    I review the basics of the finite temperature DMRG method, and then show how its efficiency can be improved by working on reduced Hilbert spaces and by using canonical approaches. My talk explains the applicability of the ancilla DMRG method beyond spins systems to t-J and Hubbard models, and addresses the computation of static and dynamical observables at finite temperature. Finally, I discuss the features of and roadmap for our DMRG + + codebase. Work done at CNMS, sponsored by the SUF Division, BES, U.S. DOE under contract with UT-Battelle. Support by the early career research program, DSUF, BES, DOE.

  3. Implement the medical group revenue function. Create competitive advantage.

    PubMed

    Colucci, C

    1998-01-01

    This article shows medical groups how they can employ new financial management and information technology techniques to safeguard their revenue and income streams. These managerial techniques stem from the application of the medical group revenue function, which is defined herein. This article also describes how the medical group revenue function can be used to create value by employing a database and a decision support system. Finally, the article describes how the decision support system can be used to create competitive advantage. Through the wise use of internally generated information, medical groups can negotiate better contract terms, improve their operations, cut their costs, embark on capital investment programs and improve market share. As medical groups gain market power by improving in these areas, they will be more attractive to potential strategic allies, payers and investment bankers.

  4. NASA Extends Chandra Science and Operations Support Contract

    NASA Astrophysics Data System (ADS)

    2010-01-01

    NASA has extended a contract with the Smithsonian Astrophysical Observatory in Cambridge, Mass., to provide science and operational support for the Chandra X-ray Observatory, a powerful tool used to better understand the structure and evolution of the universe. The contract extension with the Smithsonian Astrophysical Observatory provides continued science and operations support to Chandra. This approximately 172 million modification brings the total value of the contract to approximately 545 million for the base effort. The base effort period of performance will continue through Sept. 30, 2013, except for the work associated with the administration of scientific research grants, which will extend through Feb. 28, 2016. The contract type is cost reimbursement with no fee. In addition to the base effort, the contract includes two options for three years each to extend the period of performance for an additional six years. Option 1 is priced at approximately 177 million and Option 2 at approximately 191 million, for a total possible contract value of about $913 million. The contract covers mission operations and data analysis, which includes observatory operations, science data processing and astronomer support. The operations tasks include monitoring the health and status of the observatory and developing and uplinking the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning and coordination of science observations and processing and delivery of the resulting scientific data. NASA's Marshall Space Flight Center in Huntsville, Ala, manages the Chandra program for the agency's Science Mission Directorate in Washington. The Smithsonian Astrophysical Observatory controls Chandra's science and flight operations. For more information about the Chandra X-ray Observatory visit: http://chandra.nasa.gov

  5. Critical Issues: Keys to Successful Contracting

    ERIC Educational Resources Information Center

    Zopf, Michael

    2010-01-01

    In today's restrictive school-funding environment, many school districts are evaluating different strategies for providing noninstructional support services to preserve financial resources for the classroom. Among the strategies they are considering on a wide scale is the contracting of support functions, including pupil transportation, custodial…

  6. An Investigation into the Nature of Non-Voiding Contractions Resulting from Detrusor Hyperreflexia in Neurogenic Bladders Following Spinal Cord Injury

    DTIC Science & Technology

    2014-10-01

    SCI) is often occasioned by numerous, rhythmic high pressure non-voiding contractions (NVC) during normal bladder filling. These NVC are...addition to the 16.5 month experiment period) 2c. Final data analysis (data analysis will be ongoing throughout, this will represent the finalization...accomplished. We accomplished Sub-Tasks 2a and 2b. As of 9/2/14, we have completed much of the data analysis (Sub-Task 2c; see below for results). Analysis

  7. 48 CFR 52.216-7 - Allowable Cost and Payment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... last disclosure of internal audit reports to the Government. (J) Annual internal audit plan of...-contract cost allowability limitations, and billing limitations. (v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct...

  8. Tri-level study of the causes of traffic accidents. Volume 1, Causal factor tabulations and assessments

    DOT National Transportation Integrated Search

    1977-03-31

    This is the Final Report of the "Tri-Level Study of the Causes of Traffic Accidents," performed by the Indiana University Institute for Research in Public Safety (IRPS), under contract to the National Highway Traffic Safety Administration (Contract N...

  9. 77 FR 12724 - International Postal Service-Global Expedited Package Services (GEPS) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... POSTAL SERVICE\\TM\\ 39 CFR Part 20 International Postal Service--Global Expedited Package Services (GEPS) Contracts AGENCY: Postal Service TM . ACTION: Final rule. SUMMARY: The Postal Service will revise Mailing Standards of the United States Postal Service, International Mail Manual (IMM[supreg]) to...

  10. 77 FR 19126 - Defense Federal Acquisition Regulation Supplement: New Threshold for Peer Reviews of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Federal Acquisition Regulation Supplement: New Threshold for Peer Reviews of Noncompetitive Contracts... Regulation Supplement (DFARS) to modify the threshold for noncompetitive contract peer reviews. DATES...-6088. SUPPLEMENTARY INFORMATION: I. Background This final rule reduces the threshold for DoD peer...

  11. 48 CFR 342.705 - Final indirect cost rates.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) The Division of Financial Advisory Services, NIH, shall establish indirect cost rates, fringe benefit... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Final indirect cost rates... MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 342.705 Final indirect cost rates. (a) The Division of...

  12. 48 CFR 342.705 - Final indirect cost rates.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) The Division of Financial Advisory Services, NIH, shall establish indirect cost rates, fringe benefit... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Final indirect cost rates... MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 342.705 Final indirect cost rates. (a) The Division of...

  13. 48 CFR 342.705 - Final indirect cost rates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) The Division of Financial Advisory Services, NIH, shall establish indirect cost rates, fringe benefit... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Final indirect cost rates... MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 342.705 Final indirect cost rates. (a) The Division of...

  14. 48 CFR 342.705 - Final indirect cost rates.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) The Division of Financial Advisory Services, NIH, shall establish indirect cost rates, fringe benefit... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Final indirect cost rates... MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 342.705 Final indirect cost rates. (a) The Division of...

  15. 48 CFR 342.705 - Final indirect cost rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) The Division of Financial Advisory Services, NIH, shall establish indirect cost rates, fringe benefit... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Final indirect cost rates... MANAGEMENT CONTRACT ADMINISTRATION Indirect Cost Rates 342.705 Final indirect cost rates. (a) The Division of...

  16. 24 CFR 888.320 - One-time Contract Rent determination.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES PROGRAM) SECTION 8 HOUSING ASSISTANCE PAYMENTS PROGRAM-FAIR MARKET RENTS AND... Elderly or Handicapped, and Special Allocations Projects § 888.320 One-time Contract Rent determination...

  17. 78 FR 73504 - Procurement List; Proposed Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... Logistics Support Detachment, Undisclosed Location*, Ft. Belvoir, VA. NPA: MVLE, Inc., Springfield, VA. Contracting Activity: Directorate of Contracting Procurement Logistics Support Detachment, Fort Belvoir, VA.... Lineback, Director, Business Operations. [FR Doc. 2013-29139 Filed 12-5-13; 8:45 am] BILLING CODE 6353-01-P ...

  18. 24 CFR 266.656 - Recovery of costs after final claim settlement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Recovery of costs after final claim... Contract Rights and Obligations Claim Procedures § 266.656 Recovery of costs after final claim settlement. If, after final claim settlement, the HFA recovers additional sums as the result of the sale of the...

  19. 24 CFR 266.656 - Recovery of costs after final claim settlement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Recovery of costs after final claim... Contract Rights and Obligations Claim Procedures § 266.656 Recovery of costs after final claim settlement. If, after final claim settlement, the HFA recovers additional sums as the result of the sale of the...

  20. 24 CFR 266.656 - Recovery of costs after final claim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Recovery of costs after final claim... Contract Rights and Obligations Claim Procedures § 266.656 Recovery of costs after final claim settlement. If, after final claim settlement, the HFA recovers additional sums as the result of the sale of the...

  1. 24 CFR 266.656 - Recovery of costs after final claim settlement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Recovery of costs after final claim... Contract Rights and Obligations Claim Procedures § 266.656 Recovery of costs after final claim settlement. If, after final claim settlement, the HFA recovers additional sums as the result of the sale of the...

  2. 24 CFR 266.656 - Recovery of costs after final claim settlement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Recovery of costs after final claim... Contract Rights and Obligations Claim Procedures § 266.656 Recovery of costs after final claim settlement. If, after final claim settlement, the HFA recovers additional sums as the result of the sale of the...

  3. High speed packet switching

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document constitutes the final report prepared by Proteon, Inc. of Westborough, Massachusetts under contract NAS 5-30629 entitled High-Speed Packet Switching (SBIR 87-1, Phase 2) prepared for NASA-Greenbelt, Maryland. The primary goal of this research project is to use the results of the SBIR Phase 1 effort to develop a sound, expandable hardware and software router architecture capable of forwarding 25,000 packets per second through the router and passing 300 megabits per second on the router's internal busses. The work being delivered under this contract received its funding from three different sources: the SNIPE/RIG contract (Contract Number F30602-89-C-0014, CDRL Sequence Number A002), the SBIR contract, and Proteon. The SNIPE/RIG and SBIR contracts had many overlapping requirements, which allowed the research done under SNIPE/RIG to be applied to SBIR. Proteon funded all of the work to develop new router interfaces other than FDDI, in addition to funding the productization of the router itself. The router being delivered under SBIR will be a fully product-quality machine. The work done during this contract produced many significant findings and results, summarized here and explained in detail in later sections of this report. The SNIPE/RIG contract was completed. That contract had many overlapping requirements with the SBIR contract, and resulted in the successful demonstration and delivery of a high speed router. The development that took place during the SNIPE/RIG contract produced findings that included the choice of processor and an understanding of the issues surrounding inter processor communications in a multiprocessor environment. Many significant speed enhancements to the router software were made during that time. Under the SBIR contract (and with help from Proteon-funded work), it was found that a single processor router achieved a throughput significantly higher than originally anticipated. For this reason, a single processor router was developed and the final delivery under this contract will include a single processor CNX-500 router. The router and its interface boards (2 FDDIs and 2 dual-ethernets) are all product-quality components.

  4. Psychological contract types as moderator in the breach-violation and violation-burnout relationships.

    PubMed

    Jamil, Amber; Raja, Usman; Darr, Wendy

    2013-01-01

    This research examined the relationships between perceived psychological contract breach, felt violation, and burnout in a sample (n = 361) of employees from various organizations in Pakistan. The moderating role of contract types in these relationships was also tested. Findings supported a positive association between perceived psychological contract breach and felt violation and both were positively related to burnout. Transactional and relational contracts moderated the felt violation-burnout relationship. Scores on relational contract type tended to be higher than for transactional contract type showing some contextual influence.

  5. 48 CFR 32.1110 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... database and maintain registration until final payment, unless— (i) Payment will be made through a third... the contractor to be registered in the CCR database. (ii)(A) If permitted by agency procedures, the... authorized, in accordance with 32.1106, to use a nondomestic EFT mechanism, the contracting officer shall...

  6. 48 CFR 217.7404-6 - Allowable profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ensure the profit allowed reflects— (a) Any reduced cost risk to the contractor for costs incurred during contract performance before negotiation of the final price; (b) The contractor's reduced cost risk for costs incurred during performance of the remainder of the contract; and (c) The requirements at 215.404...

  7. 75 FR 51416 - Defense Federal Acquisition Regulation Supplement; Transportation (DFARS Case 2003-D028)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ...) The Commander, Military Sealift Command (MSC), through the Contracts and Business Management... Contracts and Business Management Directorate, MSC; or (B) The Commander, through the SDDC global e-mailbox... management. Therefore, DoD has not performed a final regulatory flexibility analysis. No comments were...

  8. 48 CFR 801.690-5 - Requirements for contracting authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Education. (1) The 24 business-related college credits shall be in any combination of the following fields of study at an accredited college or university: accounting, business, finance, law, contracts.... (2) The HCA will make the final determination whether a course is accepted as business-related for...

  9. 48 CFR 801.690-5 - Requirements for contracting authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Education. (1) The 24 business-related college credits shall be in any combination of the following fields of study at an accredited college or university: accounting, business, finance, law, contracts.... (2) The HCA will make the final determination whether a course is accepted as business-related for...

  10. 48 CFR 801.690-5 - Requirements for contracting authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Education. (1) The 24 business-related college credits shall be in any combination of the following fields of study at an accredited college or university: accounting, business, finance, law, contracts.... (2) The HCA will make the final determination whether a course is accepted as business-related for...

  11. 48 CFR 801.690-5 - Requirements for contracting authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Education. (1) The 24 business-related college credits shall be in any combination of the following fields of study at an accredited college or university: accounting, business, finance, law, contracts.... (2) The HCA will make the final determination whether a course is accepted as business-related for...

  12. 76 FR 23504 - Defense Federal Acquisition Regulation Supplement; Definition of Multiple-Award Contract (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 207 RIN 0750-AH12 Defense Federal Acquisition Regulation Supplement; Definition of Multiple-Award Contract (DFARS Case 2011-D016) AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Final rule. SUMMARY...

  13. 77 FR 194 - Federal Acquisition Regulation; Time-and-Materials and Labor-Hour Contracts for Commercial Items

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...] RIN 9000-AL74 Federal Acquisition Regulation; Time-and-Materials and Labor-Hour Contracts for... final rule amending the Federal Acquisition Regulation (FAR) to implement Government Accountability... in the following sections. II. Discussion and Analysis The Civilian Agency Acquisition Council and...

  14. 75 FR 82576 - Federal Acquisition Regulation; Terminating Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... Acquisition Council (Councils) agree. The language at FAR 49.501, pertaining to the applicability of FAR part...-AL56 Federal Acquisition Regulation; Terminating Contracts AGENCY: Department of Defense (DoD), General.... SUMMARY: DoD, GSA, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to...

  15. 76 FR 14541 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-50; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... measurement of pension cost,'' and 415 ``Accounting for the cost of deferred compensation.'' Formerly, the... Chambers. Consistency of Cost Accounting Practices for Contracts Awarded to Foreign Concerns. IX... of Cost Accounting Practices for Contracts Awarded to Foreign Concerns (FAR Case 2009-025) This final...

  16. 78 FR 26504 - Women-Owned Small Business Federal Contract Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...

  17. 75 FR 65567 - Revised Regulations Concerning Section 403(b) Tax-Sheltered Annuity Contracts; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service 26 CFR Part 1 [TD 9340] RIN 1545-BB64 Revised Regulations Concerning Section 403(b) Tax-Sheltered Annuity Contracts; Correction AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Correction to final regulations. SUMMARY: This document contains a...

  18. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  19. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  20. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  1. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  2. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  3. Additional Technologies and Investigations for Provision of Future Aeronautical Communications

    NASA Technical Reports Server (NTRS)

    Gilbert, Tricia; Jin, Jenny; Berger, Jason; Henriksen, Steve

    2008-01-01

    The following NASA Contractor Report documents the in-depth studies on select technologies that could support long-term aeronautical mobile communications operating concepts. This work was performed during the third and final phase of NASA s Technology Assessment for the Federal Aviation Administration (FAA)/EUROCONTROL Future Communications Study (FCS) under a multiyear NASA contract. It includes the associated findings of ITT Corporation and NASA Glenn Research Center to the FAA as of the end of May 2007. The activities documented in this report focus on three final technology candidates identified by the United States, and were completed before sufficient information about two additional technology candidates proposed by EUROCONTROL was made available. A separate report to be published by NASA/CR-2008-215144, entitled Final Report on Technology Investigations for Provision of Future Aeronautical Communications will include an assessment of all five final candidate technologies considered by the U.S. agencies (FAA and NASA) and EUROCONTROL. It will also provide an overview of the entire technology assessment process, including final recommendations. All three phases of this work were performed in compliance with the Terms of Reference for the Action Plan number 17 (AP-17) cooperative research agreement among EUROCONTROL, FAA, and NASA along with the general guidance of the FAA and EUROCONTROL available throughout this study.

  4. Medicare program; contracts with health maintenance organizations (HMOs) and competitive medical plans (CMPs)--HCFA. Final rule with comment period.

    PubMed

    1995-09-01

    This rule clarifies and updates portions of the HCFA regulations that pertain to the following: The conditions that an HMO or CMP must meet to qualify for a Medicare contract (Subpart J). The contract requirements (Subpart L). The rules for enrollment, entitlement, and disenrollment of Medicare beneficiaries in a contracting HMO or CMP (Subpart K). How a Medicare contract is affected when there is change of ownership or leasing of facilities of a contracting HMO or CMP (Subpart M). These are technical and editorial changes that do not affect the substance of the regulations. They are intended to make it easier to find particular provisions, to provide overviews of the different program aspects, and to better ensure uniform understanding of the rules.

  5. AFSOC Training Systems (Briefing Slides)

    DTIC Science & Technology

    2010-05-25

    ATARS II contract Aircrew Courseware Loadmaster PTT Integrated Cockpit Maintenance Trainer Weapon Systems Trainer Visual Awareness Recognition System...Training Systems Support CLS Aircrew Training and Rehearsal Support ( ATARS ) II contract, 2007 Prime: Lockheed Martin Simulation, Training & Support...Larry Allen, AFSOC/A5RT, (850) 884-5568 ATARS II: 677 AESG/SYCC, Capt Shane Smoot, (937) 255-3391 AFSOC/A3TS, Scott Murphy, (850) 884-5773 MC/AC-130J

  6. Joint Implications for Contracted Logistics

    DTIC Science & Technology

    2007-03-30

    authority with the host nation country and policy on using UCMJ for contracted personnel. As tailored theater policies are developed and contracting...responsibility, this paper recommends better joint training, leader development and joint enablers for contracting operations. JOINT...U.S. Joint Forces Command (JFCOM) are analyzing Congressional and DOD policy to develop procedures and force structure to support contractor

  7. 48 CFR 225.7704-3 - Solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... American-Trade Agreements-Balance of Payments Program solicitation provisions and contract clauses... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in Iraq or Afghanistan 225.7704-3 Solicitation provisions and contract...

  8. 48 CFR 225.7703-4 - Reporting requirement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...

  9. 48 CFR 225.7703-4 - Reporting requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...

  10. 48 CFR 225.7703-4 - Reporting requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in... reports to the Deputy Director, Contingency Contracting & Acquisition Policy, Defense Procurement and... Army, except for contract actions reported by the Joint Contracting Command. (c) The Department of the...

  11. 48 CFR 1852.243-71 - Shared savings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... organizational support of a contract or group of contracts. These alternatives must result in a net reduction of... organizational support which are proposed to be changed. (2) A description of the difference between the current... make any structural or organizational changes in order to implement an approved CRP. (5) Government...

  12. Context matters in NGO-government contracting for health service delivery: a case study from Pakistan.

    PubMed

    Zaidi, Shehla; Mayhew, Susannah H; Cleland, John; Green, Andrew T

    2012-10-01

    Contracting non-governmental organizations (NGOs) for health service provision is gaining increasing importance in low- and middle-income countries. However, the role of the wider context in influencing the effectiveness of contracting is not well studied and is of relevance given that contracting has produced mixed results so far. This paper applies a policy analysis approach to examine the influence of policy and political factors on contracting origin, design and implementation. Evidence is drawn from a country case study of Pakistan involving extensive NGO contracting for human immunodeficiency virus (HIV) prevention services supported by international donor agencies. A multilevel study was conducted using 84 in-depth interviews, 22 semi-structured interviews, document review and direct observation to examine the national policy design, provincial management of contracting and local contract implementation. There were three main findings. First, contracting origin and implementation was an inherently political process affected by the wider policy context. Although in Pakistan a combination of situational events successfully managed to introduce extensive and sophisticated contracting, it ran into difficulties during implementation due to ownership and capacity issues within government. Second, wide-scale contracting was mis-matched with the capacity of local NGOs, which resulted in sub-optimal contract implementation challenging the reliance on market simulation through contracting. Third, we found that contracting can have unintended knock-on effects on both providers and purchasers. As a result of public sector contracts, NGOs became more distanced from their grounded attributes. Effects on government purchasers were more unpredictable, with greater identification with contracting in supportive governance contexts and further distancing in unsupportive contexts. A careful approach is needed in government contracting of NGOs, taking into account acceptance of contracting NGOs, local NGO capacities and potential distancing of NGOs from their traditional attributes under contracts. Political factors and knock-on effects are likely to be heightened in the sudden and aggressive use of contracting in unprepared settings.

  13. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    NASA Astrophysics Data System (ADS)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  14. Let's be professional about this: ideology and the psychological contracts of registered nurses.

    PubMed

    O'Donohue, Wayne; Nelson, Lindsay

    2007-07-01

    This study explores whether there is evidence of an ideological component in the psychological contracts of professional employees, as well as evidence of credible supporting commitments by their employer. Fundamental changes in the employment context have prompted many individuals to seek a closer alignment between themselves and their work, as well as with the organizational and broader societal contexts. For many professional employees identification with their professional ideology is a significant factor in producing such an alignment. The study uses an exploratory qualitative approach to analyse interview data collected from a sample of registered nurses employed in an Australian public hospital. The analysis identifies psychological contract terms best understood by reference to an ideological currency. It also suggests that the organization is perceived as obligated to provide credible support for that professional contribution, and the perceived lack of such support has significant impacts. The findings raise doubts about the utility of the concept of a psychological contract that recognizes only economic and socio-emotional exchanges for understanding the psychological contracts of professional employees.

  15. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  16. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  17. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  18. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  19. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  20. 48 CFR 1852.216-77 - Award fee for end item contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is “poor... the Contractor's interim performance every 6* months to monitor Contractor performance prior to...

  1. 39 CFR 960.12 - When an application may be filed.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... before the Board of Contract Appeals, the Board of Contract Appeals decision on quantum. When the Board decides only entitlement and remands the issue of quantum to the parties, the final disposition occurs when the parties execute an agreement on quantum, or if the parties cannot agree on quantum and...

  2. 39 CFR 960.12 - When an application may be filed.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... before the Board of Contract Appeals, the Board of Contract Appeals decision on quantum. When the Board decides only entitlement and remands the issue of quantum to the parties, the final disposition occurs when the parties execute an agreement on quantum, or if the parties cannot agree on quantum and...

  3. 39 CFR 960.12 - When an application may be filed.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... before the Board of Contract Appeals, the Board of Contract Appeals decision on quantum. When the Board decides only entitlement and remands the issue of quantum to the parties, the final disposition occurs when the parties execute an agreement on quantum, or if the parties cannot agree on quantum and...

  4. 39 CFR 960.12 - When an application may be filed.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... before the Board of Contract Appeals, the Board of Contract Appeals decision on quantum. When the Board decides only entitlement and remands the issue of quantum to the parties, the final disposition occurs when the parties execute an agreement on quantum, or if the parties cannot agree on quantum and...

  5. 5 CFR 2634.904 - Confidential filer defined.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... activities in which the final decision or action will have a direct and substantial economic effect on the... have a substantial economic effect on the plant's interests, the engineer should be required to file a... maintaining an on-line contract database. The Assistant is not involved in contracting and has no other actual...

  6. 5 CFR 2634.904 - Confidential filer defined.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... activities in which the final decision or action will have a direct and substantial economic effect on the... have a substantial economic effect on the plant's interests, the engineer should be required to file a... maintaining an on-line contract database. The Assistant is not involved in contracting and has no other actual...

  7. 76 FR 14572 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-50; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Standards (CAS) Board standards 412 ``Cost Accounting Standard for composition and measurement of pension... Disclosure and 2009-025 Chambers. Consistency of Cost Accounting Practices for Contracts Awarded to Foreign... Accounting Practices for Contracts Awarded to Foreign Concerns (FAR Case 2009-025) This final rule adopts...

  8. Final Evaluation Report on the Texarkana Dropout Prevention Program.

    ERIC Educational Resources Information Center

    Andrew, Dean C.; Roberts, Lawrence H.

    The Texarkana Dropout Prevention Program is an educational innovation in which (1) a private company was placed under contract to set up special, remedial instruction in the public schools, and (2) the company was to be paid according to the results produced under a performance contract. Dorsett Educational Systems operated six rapid learning…

  9. 39 CFR 960.12 - When an application may be filed.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... before the Board of Contract Appeals, the Board of Contract Appeals decision on quantum. When the Board decides only entitlement and remands the issue of quantum to the parties, the final disposition occurs when the parties execute an agreement on quantum, or if the parties cannot agree on quantum and...

  10. 77 FR 2726 - General Services Administration Acquisition Regulation; Information Collection; Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... Claims, regarding final payment under construction and building services contract. GSA Form 1142 was... (GSAR Part 532 and 552.232-72; GSA Form 1142 Release of Claims) AGENCY: Office of the Chief Acquisition... have used this form to achieve uniformity and consistency in the release of claims process. Public...

  11. Advanced transportation system studies technical area 2(TA-2): Heavy lift launch vehicle development. volume 1; Executive summary

    NASA Technical Reports Server (NTRS)

    McCurry, J.

    1995-01-01

    The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).

  12. Dielectric Loaded Broadband Gyro-TWT System

    DTIC Science & Technology

    1993-12-31

    A•wov•] f~ •ubic re] ease ;a AD-A277 889 -4 LLV t Final Report 01 Jan 92 - 31 Dec 93 DIELECTRIC LOADED BROADBAND GYRO- TWT SYSTEM Professor N. C...Loaded Broadband Gyro- TWT System" CONTRACT / GRANT NO.: F49620-92-J-O 175 CONTRACT / GRANT VALUE: $89,816 Acce’son For CONTRACT / GRANT PERIOD OF... Broadband Dielectric-Loaded Gyro- TWT Amplifier," submitted for publication to Physics Review Letters, October, 1993. A. Gover, F.V. Hartemann, G.P. Le

  13. The Government of Islamic Republic of Afghanistan’s Controls Over the Contract Management Process for U.S. Direct Assistance Need Improvement

    DTIC Science & Technology

    2015-02-25

    develop, award, execute, or monitor individual contracts funded with U.S. direct assistance. This occurred because the Ministry of Finance ( MoF ...trained staff to collaborate with the Ministry of Finance ( MoF ), MoD, and MoI for budgeting, acquisition planning, procurement, financial management...and contract management and oversight. Finally, CSTC-A must ensure MoF , MoD, and MoI establish standard operating procedures and maintain adequate

  14. Microcomputer Processing of LANDSAT Thematic Mapper Data for the Acquisition of Military Tactical Terrain Data.

    DTIC Science & Technology

    1985-04-12

    12 9 5 VPV TiTAY T,%. T , TiRAiU A ~ 6. PERFORMING ORG. REPORT NUMBER 7. AUTHOR(.) 6. CONTRACT OR GRANT NUMBER(a) .-- CPT zi 0 9. PERFORMING ...of period covered, such as the life of a contract covered in a final contractor report. Block 6. Performing Organization Report Number. Only numbers...affiliation of an author if it differs from that of the performing organization. Block 8. Contract or grant Number(s). For a contractor or grantee

  15. 78 FR 43912 - Final Candidate Conservation Agreement with Assurances, Final Environmental Assessment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... climate change. Because of the range contraction and the imminent threats, the Rio Grande cutthroat trout... Finding of No Significant Impact; Rio Grande Cutthroat Trout, New Mexico and Colorado AGENCY: Fish and... Grande cutthroat trout (Oncorhynchus clarki virginialis) in New Mexico and Colorado, as well as the final...

  16. 48 CFR 552.246-72 - Final Inspection and Tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Final Inspection and Tests. 552.246-72 Section 552.246-72 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552.246-72 Final Inspection and Tests. As prescribed...

  17. The Rosetta Science Archive: Status and Plans for Enhancing the Archive Content

    NASA Astrophysics Data System (ADS)

    Heather, David; Barthelemy, Maud; Besse, Sebastien; Fraga, Diego; Grotheer, Emmanuel; O'Rourke, Laurence; Taylor, Matthew; Vallat, Claire

    2017-04-01

    On 30 September 2016, Rosetta completed its incredible mission by landing on the surface of Comet 67P/Churyumov-Gerasimenko. Although this marked an end to the spacecraft's active operations, intensive work is still ongoing with instrument teams preparing their final science data deliveries for ingestion into ESA's Planetary Science Archive (PSA). In addition, ESA is establishing contracts with some instrument teams to enhance their data and documentation in an effort to provide the best long-term archive possible for the Rosetta mission. Currently, the majority of teams have delivered all of their data from the nominal mission (end of 2015), and are working on their remaining increments from the 1-year mission extension. The aim is to complete the nominal archiving with data from the complete mission by the end of this year, when a full mission archive review will be held. This review will assess the complete data holdings from Rosetta and ensure that the archive is ready for the long-term. With the resources from the operational mission coming to an end, ESA has established a number of 'enhanced archiving' contracts to ensure that the best possible data are delivered to the archive before instrument teams disband. Updates are focused on key aspects of an instrument's calibration or the production of higher level data / information, and are therefore specific to each instrument's needs. These contracts are currently being kicked off, and will run for various lengths depending upon the activities to be undertaken. The full 'archive enhancement' process will run until September 2019, when the post operations activities for Rosetta will end. Within these contracts, most instrument teams will work on providing a Science User Guide for their data, as well as updating calibrations. Several teams will also be delivering higher level and derived products. For example, the VIRTIS team will be updating both their spectral and geometrical calibrations, and will aim to deliver mapping products to the final archive. Similarly, the OSIRIS team will be improving their calibrations and delivering data additionally in FITS format. The Rosetta Plasma Consortium (RPC) instruments will complete cross-calibrations and a number of activities individual to each instrument. The MIDAS team will also be working on cross-calibrations and will produce a dust particle catalog from the comet coma. GIADA will be producing dust environment maps, with products in 3D plus time. A contract also exists to produce and deliver data set(s) containing sup-porting ground-based observations from amateur astronomers. In addition to these contracts, the Rosetta ESA archiving team will produce calibrated data sets for the NAVCAM instrument, and will work to include the latest shape models from the comet into the final Rosetta archive. Work is also underway to provide a centralized solution to the problem of geometry on the comet. This presentation will outline the current status of the Rosetta archive, as well as highlighting some of the 'enhanced archiving' activities planned with the various instrument teams on Rosetta.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rajbhandari, Samyam; NIkam, Akshay; Lai, Pai-Wei

    Tensor contractions represent the most compute-intensive core kernels in ab initio computational quantum chemistry and nuclear physics. Symmetries in these tensor contractions makes them difficult to load balance and scale to large distributed systems. In this paper, we develop an efficient and scalable algorithm to contract symmetric tensors. We introduce a novel approach that avoids data redistribution in contracting symmetric tensors while also avoiding redundant storage and maintaining load balance. We present experimental results on two parallel supercomputers for several symmetric contractions that appear in the CCSD quantum chemistry method. We also present a novel approach to tensor redistribution thatmore » can take advantage of parallel hyperplanes when the initial distribution has replicated dimensions, and use collective broadcast when the final distribution has replicated dimensions, making the algorithm very efficient.« less

  19. Proposal Improvements That Work

    NASA Technical Reports Server (NTRS)

    Dunn, F.

    1998-01-01

    Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.

  20. Acceptance Testing of the Vapor Phase Catalytic Ammonia Removal Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Flynn, Michael; Fisher, John; Kliss, Mark; Tleimat, Maher; Quinn, Gregory; Fort, James; Nalette, Tim; Baker, Gale

    2005-01-01

    This paper describes the results of acceptance testing of the Vapor Phase Catalytic Ammonia Removal (VPCAR) technology. The VPCAR technology is currently being developed by NASA as a Mars transit vehicle water recycling system. NASA has recently completed a grant to develop a next generation VPCAR system. This grant was peer reviewed and funded through the Advanced Life Support (ALS) National Research Announcement (NRA). The grant funded a contract with Water Reuse Technology Inc. to construct an engineering development unit. This contract concluded with the shipment of the final deliverable to NASA on 8/31/03. The objective of the acceptance testing was to characterize the performance of this new system. This paper presents the results of mass power, and volume measurements for the delivered system. In addition, product water purity analysis for a Mars transit mission and a planetary base wastewater ersatz are provided. Acoustic noise levels, interface specifications and system reliability results are also discussed. An assessment of the readiness of the technology for human testing and recommendations for future improvements are provided.

  1. Modeling of Rolling Element Bearing Mechanics: Computer Program Updates

    NASA Technical Reports Server (NTRS)

    Ryan, S. G.

    1997-01-01

    The Rolling Element Bearing Analysis System (REBANS) extends the capability available with traditional quasi-static bearing analysis programs by including the effects of bearing race and support flexibility. This tool was developed under contract for NASA-MSFC. The initial version delivered at the close of the contract contained several errors and exhibited numerous convergence difficulties. The program has been modified in-house at MSFC to correct the errors and greatly improve the convergence. The modifications consist of significant changes in the problem formulation and nonlinear convergence procedures. The original approach utilized sequential convergence for nested loops to achieve final convergence. This approach proved to be seriously deficient in robustness. Convergence was more the exception than the rule. The approach was changed to iterate all variables simultaneously. This approach has the advantage of using knowledge of the effect of each variable on each other variable (via the system Jacobian) when determining the incremental changes. This method has proved to be quite robust in its convergence. This technical memorandum documents the changes required for the original Theoretical Manual and User's Manual due to the new approach.

  2. Hydrodynamic Impacts on Dissolution, Transport and Absorption from Thousands of Drug Particles Moving within the Intestines

    NASA Astrophysics Data System (ADS)

    Behafarid, Farhad; Brasseur, James G.

    2017-11-01

    Following tablet disintegration, clouds of drug particles 5-200 μm in diameter pass through the intestines where drug molecules are absorbed into the blood. Release rate depends on particle size, drug solubility, local drug concentration and the hydrodynamic environment driven by patterned gut contractions. To analyze the dynamics underlying drug release and absorption, we use a 3D lattice Boltzmann model of the velocity and concentration fields driven by peristaltic contractions in vivo, combined with a mathematical model of dissolution-rate from each drug particle transported through the grid. The model is empirically extended for hydrodynamic enhancements to release rate by local convection and shear-rate, and incorporates heterogeneity in bulk concentration. Drug dosage and solubility are systematically varied along with peristaltic wave speed and volume. We predict large hydrodynamic enhancements (35-65%) from local shear-rate with minimal enhancement from convection. With high permeability boundary conditions, a quasi-equilibrium balance between release and absorption is established with volume and wave-speed dependent transport time scale, after an initial transient and before a final period of dissolution/absorption. Supported by FDA.

  3. A Study of Strong Stability of Distributed Systems. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Cataltepe, Tayfun

    1989-01-01

    The strong stability of distributed systems is studied and the problem of characterizing strongly stable semigroups of operators associated with distributed systems is addressed. Main emphasis is on contractive systems. Three different approaches to characterization of strongly stable contractive semigroups are developed. The first one is an operator theoretical approach. Using the theory of dilations, it is shown that every strongly stable contractive semigroup is related to the left shift semigroup on an L(exp 2) space. Then, a decomposition for the state space which identifies strongly stable and unstable states is introduced. Based on this decomposition, conditions for a contractive semigroup to be strongly stable are obtained. Finally, extensions of Lyapunov's equation for distributed parameter systems are investigated. Sufficient conditions for weak and strong stabilities of uniformly bounded semigroups are obtained by relaxing the equivalent norm condition on the right hand side of the Lyanupov equation. These characterizations are then applied to the problem of feedback stabilization. First, it is shown via the state space decomposition that under certain conditions a contractive system (A,B) can be strongly stabilized by the feedback -B(*). Then, application of the extensions of the Lyapunov equation results in sufficient conditions for weak, strong, and exponential stabilizations of contractive systems by the feedback -B(*). Finally, it is shown that for a contractive system, the first derivative of x with respect to time = Ax + Bu (where B is any linear bounded operator), there is a related linear quadratic regulator problem and a corresponding steady state Riccati equation which always has a bounded nonnegative solution.

  4. Performance-based contracting in home-care work in The Netherlands: professionalism under pressure?

    PubMed

    Oomkens, Rosanne; Hoogenboom, Marcel; Knijn, Trudie

    2016-07-01

    Our aim was to improve the understanding of the relationships between performance-based contracting, management supportiveness and professionalism in home care. Using path analysis, this article explores the relationships between home-care workers' perceptions of management support, implementation of performance-based contracting (i.e. use of strict time registration rules and cost-efficiency measures) and autonomy and intrinsic job satisfaction. We hypothesised that: use of strict time registration rules and cost-efficiency measures relates to lower levels of autonomy and intrinsic job satisfaction (H1); there is an indirect relationship between use of strict time registration rules and use of cost-efficiency measures and intrinsic job satisfaction via autonomy (H2); higher levels of management support relate to the use of looser time registration rules and less use of cost-efficiency measures (H3); and higher levels of management support relate to higher levels of autonomy and intrinsic job satisfaction (H4). We used data from a cross-sectional survey conducted in 2010 of a sample of Dutch home-care workers (N = 156, response rate = 34%). Overall, our study suggests that the consequences of performance-based contracting for professionalism are ambiguous. More specifically, using strict time registration rules is related to lower levels of autonomy, whereas using cost-efficiency measures does not seem to affect autonomy (H1). Performance-based contracting has no consequences for the level of fulfilment home-care workers find in their job, as neither of the two contracting dimensions measured was directly or indirectly related to intrinsic job satisfaction (H1, H2). The role of managers must be taken into account when studying performance-based contracting, because perceived higher management support is related to managers' less frequent use of both strict time registration rules and of cost-efficiency measures (H3). The insight we gained into the importance of supportive managers for both autonomy and job satisfaction (H4) can help home-care organisations improve the attractiveness of home-care work. © 2015 John Wiley & Sons Ltd.

  5. The relationships between perceived organizational support, affective commitment, psychological contract breach, organizational citizenship behaviour and work engagement.

    PubMed

    Gupta, Vishal; Agarwal, Upasna A; Khatri, Naresh

    2016-11-01

    This study examines the factors that mediate and moderate the relationships of perceived organizational support with work engagement and organization citizenship behaviour. Specifically, affective commitment is posited to mediate and psychological contract breach to moderate the above relationships. Nurses play a critical role in delivering exemplary health care. For nurses to perform at their best, they need to experience high engagement, which can be achieved by providing them necessary organizational support and proper working environment. Data were collected via a self-reported survey instrument. A questionnaire was administered to a random sample of 750 nurses in nine large hospitals in India during 2013-2014. Four hundred and seventy-five nurses (63%) responded to the survey. Hierarchical multiple regression was used for statistical analysis of the moderated-mediation model. Affective commitment was found to mediate the positive relationships between perceived organizational support and work outcomes (work engagement, organizational citizenship behaviour). The perception of unfulfilled expectations (psychological contract breach) was found to moderate the perceived organizational support-work outcome relationships adversely. The results of this study indicate that perceived organizational support exerts its influence on work-related outcomes and highlight the importance of taking organizational context, such as perceptions of psychological contract breach, into consideration when making sense of the influence of perceived organizational support on affective commitment, work engagement and citizenship behaviours of nurses. © 2016 John Wiley & Sons Ltd.

  6. Contracts in radiology practices: breaches and remedies.

    PubMed

    Muroff, Julie A; Muroff, Lawrence R

    2004-08-01

    Contracts between radiology groups and their physician members are often ambiguous. Key clauses may not be precise as to the intent of the contracting parties. For example, the requirements for a group member to achieve shareholder status may be discussed but not reduced to a written form. Other contract provisions, such as termination or noncompete clauses, may be subject to different interpretations. The ambiguities of these provisions often generate disparate expectations regarding the parties' obligations to one another. When this occurs, the results may vary from disappointment to litigation. This paper discusses the causes and consequences of common breaches of radiology contracts. The types of remedies that may be available to the parties of the contract are also enumerated, and case law is cited to illustrate the challenges that radiology groups and their members may encounter. Finally, alternative forms of dispute resolution are discussed.

  7. 48 CFR 15.605 - Content of unsolicited proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 15.605 Content of... and type of organization; e.g., profit, nonprofit, educational, small business; (2) Names and..., including alternates; and (4) Type of support needed from the agency; e.g., Government property or personnel...

  8. 76 FR 58136 - Defense Federal Acquisition Regulation Supplement; Designation of a Contracting Officer's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... Headquarters NATO Training Mission--Afghanistan (NTM-A) to permit the designation of non-U.S. Government employees as contracting officer's representatives (CORs) in support of the NTM-A's efforts to train the Afghan National Security Force (ANSF). The NTM-A supports the growth of the ANSF through numerous...

  9. Differences in the Thoracic Aorta by Region and Sex in a Murine Model of Marfan Syndrome.

    PubMed

    Jiménez-Altayó, Francesc; Siegert, Anna-Maria; Bonorino, Fabio; Meirelles, Thayna; Barberà, Laura; Dantas, Ana P; Vila, Elisabet; Egea, Gustavo

    2017-01-01

    Marfan syndrome (MFS) is a hereditary disorder of the connective tissue that causes life-threatening aortic aneurysm, which initiates at the aortic root and can progress into the ascending portion. However, analysis of ascending aorta reactivity in animal models of MFS has remained elusive. Epidemiologic evidence suggests that although MFS is equally prevalent in men and women, men are at a higher risk of aortic complications than non-pregnant women. Nevertheless, there is no experimental evidence to support this hypothesis. The aim of this study was to explore whether there are regional and sex differences in the thoracic aorta function of mice heterozygous for the fibrillin 1 ( Fbn1 ) allele encoding a missense mutation ( Fbn1 C1039G/+ ), the most common class of mutation in MFS. Ascending and descending thoracic aorta reactivity was evaluated by wire myography. Ascending aorta mRNA and protein levels, and elastic fiber integrity were assessed by qRT-PCR, Western blotting, and Verhoeff-Van Gieson histological staining, respectively. MFS differently altered reactivity in the ascending and descending thoracic aorta by either increasing or decreasing phenylephrine contractions, respectively. When mice were separated by sex, contractions to phenylephrine increased progressively from 3 to 6 months of age in MFS ascending aortas of males, whereas contractions in females were unchanged. Endothelium-dependent relaxation was unaltered in the MFS ascending aorta of either sex; an effect related to augmented endothelium-dependent hyperpolarization-type dilations. In MFS males, the non-selective cyclooxygenase (COX) inhibitor indomethacin prevented the MFS-induced enhancement of phenylephrine contractions linked to increased COX-2 expression. In MFS mice of both sexes, the non-selective nitric oxide synthase inhibitor L-NAME revealed negative feedback of nitric oxide on phenylephrine contractions, which was associated with upregulation of eNOS in females. Finally, MFS ascending aortas showed a greater number of elastic fiber breaks than the wild-types, and males exhibited more breaks than females. These results show regional and sex differences in Fbn1 C1039G/+ mice thoracic aorta contractility and aortic media injuries. The presence of more pronounced aortic alterations in male mice provides experimental evidence to support that male MFS patients are at increased risk of suffering aortic complications.

  10. Differences in the Thoracic Aorta by Region and Sex in a Murine Model of Marfan Syndrome

    PubMed Central

    Jiménez-Altayó, Francesc; Siegert, Anna-Maria; Bonorino, Fabio; Meirelles, Thayna; Barberà, Laura; Dantas, Ana P.; Vila, Elisabet; Egea, Gustavo

    2017-01-01

    Marfan syndrome (MFS) is a hereditary disorder of the connective tissue that causes life-threatening aortic aneurysm, which initiates at the aortic root and can progress into the ascending portion. However, analysis of ascending aorta reactivity in animal models of MFS has remained elusive. Epidemiologic evidence suggests that although MFS is equally prevalent in men and women, men are at a higher risk of aortic complications than non-pregnant women. Nevertheless, there is no experimental evidence to support this hypothesis. The aim of this study was to explore whether there are regional and sex differences in the thoracic aorta function of mice heterozygous for the fibrillin 1 (Fbn1) allele encoding a missense mutation (Fbn1C1039G/+), the most common class of mutation in MFS. Ascending and descending thoracic aorta reactivity was evaluated by wire myography. Ascending aorta mRNA and protein levels, and elastic fiber integrity were assessed by qRT-PCR, Western blotting, and Verhoeff-Van Gieson histological staining, respectively. MFS differently altered reactivity in the ascending and descending thoracic aorta by either increasing or decreasing phenylephrine contractions, respectively. When mice were separated by sex, contractions to phenylephrine increased progressively from 3 to 6 months of age in MFS ascending aortas of males, whereas contractions in females were unchanged. Endothelium-dependent relaxation was unaltered in the MFS ascending aorta of either sex; an effect related to augmented endothelium-dependent hyperpolarization-type dilations. In MFS males, the non-selective cyclooxygenase (COX) inhibitor indomethacin prevented the MFS-induced enhancement of phenylephrine contractions linked to increased COX-2 expression. In MFS mice of both sexes, the non-selective nitric oxide synthase inhibitor L-NAME revealed negative feedback of nitric oxide on phenylephrine contractions, which was associated with upregulation of eNOS in females. Finally, MFS ascending aortas showed a greater number of elastic fiber breaks than the wild-types, and males exhibited more breaks than females. These results show regional and sex differences in Fbn1C1039G/+ mice thoracic aorta contractility and aortic media injuries. The presence of more pronounced aortic alterations in male mice provides experimental evidence to support that male MFS patients are at increased risk of suffering aortic complications. PMID:29187826

  11. Building America Industrialized Housing Partnership (BAIHP II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abernethy, Bob; Chandra, Subrato; Baden, Steven

    2010-11-30

    This report summarizes the work conducted by the Building America Industrialized Housing Partnership (BAIHP - www.baihp.org) during the final budget period (BP5) of our contract, January 1, 2010 to November 30, 2010. Highlights from the four previous budget periods are included for context. BAIHP is led by the Florida Solar Energy Center (FSEC) of the University of Central Florida. With over 50 Industry Partners including factory and site builders, work in BP5 was performed in six tasks areas: Building America System Research Management, Documentation and Technical Support; System Performance Evaluations; Prototype House Evaluations; Initial Community Scale Evaluations; Project Closeout, Finalmore » Review of BA Communities; and Other Research Activities.« less

  12. Biological Effects of Directed Energy

    NASA Astrophysics Data System (ADS)

    Dayton, Thomas; Beason, Charles; Hitt, M. K.; Rogers, Walter; Cook, Michael

    2002-11-01

    This Final Report summarizes the biological effects research conducted by Veridian Engineering personnel under contract F41624-96-C-9009 in support of the Air Force Research Laboratory's Radio Frequency Radiation Branch from April 1997 to April 2002. Biological effects research and consultation were provided in five major areas: Active Denial System (also known as Vehicle Mounted Active Denial System), radio frequency radiation (RFR) health and safety, non-lethal weapon biological effects research, the newly formed Joint Non-Lethal Weapons Human Effects Center of Excellence, and Biotechnology. The report is organized by research efforts within the major research areas, providing title, objective, a brief description, relevance to the AF or DoD, funding, and products.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauro, R.; Leach, S.

    This paper summarizes current and planned activities in the areas of hydrogen production and use, near-term venture opportunities, and codes and standards. The rationale for these efforts is to assess industry interest and engage in activities that move hydrogen technologies down the path to commercialization. Some of the work presented in this document is a condensed, preliminary version of reports being prepared under the DOE/NREL contract. In addition, the NHA work funded by Westinghouse Savannah River Corporation (WSRC) to explore the opportunities and industry interest in a Hydrogen Research Center is briefly described. Finally, the planned support of and industrymore » input to the Hydrogen Technical Advisory Panel (HTAP) on hydrogen demonstration projects is discussed.« less

  14. U.S. Army Central and U.S. Army Contracting Command-Rock Island Need to Improve Facility Maintenance at King Abdullah II Special Operations Training Center

    DTIC Science & Technology

    2016-03-23

    cleaned so that they are free of dust, dirt, lint and human waste, and trash.” However, the contract did not explicitly state that the facilities...be free of mold/mildew. ACC–RI and ARCENT should review and modify the basic life support services contract, as necessary, to include measures...Responsibility, “The Sand Book,” July 18, 2014. 16 Unified Facility Criteria 1-202-01, “Host Nation Facilities in Support of Military Operations,” September 1

  15. Medicare program; offset of Medicare payments to individuals to collect past-due obligations arising from breach of scholarship and loan contracts--HCFA. Final rule.

    PubMed

    1992-05-04

    This final rule sets forth the procedures to be followed for collection of past-due amounts owed by individuals who breached contracts under certain scholarship and loan programs. The programs that would be affected are the National Health Service Corps Scholarship, the Physician Shortage Area Scholarship, and the Health Education Assistance Loan. These procedures would apply to those individuals who breached contracts under the scholarship and loan programs and who-- Accept Medicare assignment for services; Are employed by or affiliated with a provider, Health Maintenance Organization, or Competitive Medical Plan that receives Medicare payment for services; or Are members of a group practice that receives Medicare payment for services. This regulation implements section 1892 of the Social Security Act, as added by section 4052 of the Omnibus Budget Reconciliation Act of 1987.

  16. Performance Contracting in Elementary and Secondary Education. A Report Showing the Developments on a Nationwide Basis and the Implications for New York State.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Div. of Evaluation.

    This paper describes the historical development of performance contracting, discusses the first performance contracting experiment, cites reactions to performance contracting, and supplies supportive data. The contents are designed to assist the New York State Board of Regents to determine policy for the State Education Department and the New York…

  17. The petroleum explorationist's guide to contracts used in oil and gas operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mosburg, L.G. Jr.

    This volume provides articles and current sample forms of contract negotiation and drafting. The contents include: An introduction to oil and gas contracts; Effective deal negotiation; General principles of contract law and negotiation; Problems and pitfalls in support agreements; Sample support agreements; Basic concept of farmout agreements; Farmout negotiation checklist; ''Area of mutual interest'' provisions, Problems and pitfalls in 'contract (minimum) depth' and 'farmout (earned) depth' provisions; Options in interests assigned and reserved; Sample 'AMI' provision; ''conventional'' and ''revenue ruling 77-176'' farmout agreement forms; the AAPL model from operating agreement; 1982 revisions to the model form; Side-by-side comparisons of themore » 1956, 1977 and 1982 model forms, 1984 (1985) COPAS accounting procedure; Tax consequences of oil and gas exploration and development, revenue ruling 77-176; Use of tax partnerships and present assignments; Also materials on gas balancing agreements: Seismic options; and Structuring considerations.« less

  18. Analysis of the 918th Contracting Battalion and 410th Contracting Support Brigade Utilizing the Contract Management Maturity Model

    DTIC Science & Technology

    2015-12-01

    organizational structure of Army contracting and the changes to that organization under the MICC 2025 plan. We then describe the organizations where we... organizational change . Portal: Libraries and the Academy, 4(3), 345–361. McFall, T. (2015). 918th CBN/MICC-FC organizational overview [PowerPoint slides...Installation Contracting Command (MICC) are undergoing a significant change in structure known as MICC 2025. In order to gauge the effectiveness of this

  19. 76 FR 11680 - Service Contracts and Non-Vessel-Operating Service Arrangements; Transmission of Approved Log-In...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Contracts and Non-Vessel-Operating Service Arrangements; Transmission of Approved Log-In ID and Passwords... advise applicants for log-in IDs and passwords. DATES: The Final Rule is effective March 3, 2011. FOR... the U.S. Mail to transmit approved log-on IDs and password to registrants in the Commission's...

  20. 76 FR 56838 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated: Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... addition, the Exchange is proposing to eliminate the PULSe non-standard services fee. Finally, the Exchange is proposing to make a non-substantive numbering correction to its Fees Schedule. All of these... executed contract or share equivalent. The Exchange is proposing to reduce the fee to $0.02 per contract or...

  1. 76 FR 58137 - Defense Federal Acquisition Regulation Supplement; Positive Law Codification of Title 41 U.S.C...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... Supplement; Positive Law Codification of Title 41 U.S.C. (DFARS Case 2011-D036) AGENCY: Defense Acquisition... DFARS to the new Codification of Title 41, United States Code, ``Public Contracts.'' DATES: Effective... of Title 41, United States Code (U.S.C.), entitled ``Public Contracts.'' The purpose of this final...

  2. 48 CFR 1837.110-70 - NASA solicitation provision and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA solicitation provision...-General 1837.110-70 NASA solicitation provision and contract clauses. (a) The contracting officer shall...-site support services where emergency evacuations of the NASA installation may occur, e.g., snow...

  3. 48 CFR 50.206 - Solicitation provisions and contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (3) Use the provision at 52.250-3 with its Alternate II when offers presuming SAFETY Act designation... Alternate II; and (2) In any resultant contract, if DHS has not issued SAFETY Act designation or... REGULATION CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Support Anti-terrorism by...

  4. 48 CFR 50.206 - Solicitation provisions and contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (3) Use the provision at 52.250-3 with its Alternate II when offers presuming SAFETY Act designation... Alternate II; and (2) In any resultant contract, if DHS has not issued SAFETY Act designation or... REGULATION CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Support Anti-terrorism by...

  5. Contracting by Competitive Negotiations in Support of FMS

    DTIC Science & Technology

    1993-01-01

    34over-regulated," in the view of two recognized authorities in federal government contract law .5 In balance, however, another respected authority who...America’s military hardware is sought by almost every nation.Ś In 1993, I requested a leading authority on Government procurement contract law , John

  6. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  7. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  8. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  9. Sample Language of Modified Contract Elements from Existing CBAs, MOUs, or EWAs to Support Turnaround

    ERIC Educational Resources Information Center

    Mass Insight Education (NJ1), 2011

    2011-01-01

    Organized by the key conditions areas for turnaround, "People, Program, Time and Money," this tool offers sample language for each contract element to serve as a model for modifications from a traditional CBA that may support a district's turnaround efforts. Sample language is offered from existing provisions in district-wide collective bargaining…

  10. Connecting macroscopic dynamics with microscopic properties in active microtubule network contraction

    NASA Astrophysics Data System (ADS)

    Foster, Peter J.; Yan, Wen; Fürthauer, Sebastian; Shelley, Michael J.; Needleman, Daniel J.

    2017-12-01

    The cellular cytoskeleton is an active material, driven out of equilibrium by molecular motor proteins. It is not understood how the collective behaviors of cytoskeletal networks emerge from the properties of the network’s constituent motor proteins and filaments. Here we present experimental results on networks of stabilized microtubules in Xenopus oocyte extracts, which undergo spontaneous bulk contraction driven by the motor protein dynein, and investigate the effects of varying the initial microtubule density and length distribution. We find that networks contract to a similar final density, irrespective of the length of microtubules or their initial density, but that the contraction timescale varies with the average microtubule length. To gain insight into why this microscopic property influences the macroscopic network contraction time, we developed simulations where microtubules and motors are explicitly represented. The simulations qualitatively recapitulate the variation of contraction timescale with microtubule length, and allowed stress contributions from different sources to be estimated and decoupled.

  11. Identifying Psychological Contract Breaches to Guide Improvements in Faculty Recruitment, Retention, and Development

    PubMed Central

    Desselle, Shane P.; Draugalis, JoLaine R.; Spies, Alan R.; Davis, Tamra S.; Bolino, Mark

    2012-01-01

    Objective. To identify pharmacy faculty members’ perceptions of psychological contract breaches that can be used to guide improvements in faculty recruitment, retention, and development. Methods. A list of psychological contract breaches was developed using a Delphi procedure involving a panel of experts assembled through purposive sampling. The Delphi consisted of 4 rounds, the first of which elicited examples of psychological contract breaches in an open-ended format. The ensuing 3 rounds consisting of a survey and anonymous feedback on aggregated group responses. Results. Usable responses were obtained from 11 of 12 faculty members who completed the Delphi procedure. The final list of psychological contract breaches included 27 items, after modifications based on participant feedback in subsequent rounds. Conclusion. The psychological contract breach items generated in this study provide guidance for colleges and schools of pharmacy regarding important aspects of faculty recruitment, retention, and development. PMID:22919084

  12. Identifying psychological contract breaches to guide improvements in faculty recruitment, retention, and development.

    PubMed

    Peirce, Gretchen L; Desselle, Shane P; Draugalis, JoLaine R; Spies, Alan R; Davis, Tamra S; Bolino, Mark

    2012-08-10

    To identify pharmacy faculty members' perceptions of psychological contract breaches that can be used to guide improvements in faculty recruitment, retention, and development. A list of psychological contract breaches was developed using a Delphi procedure involving a panel of experts assembled through purposive sampling. The Delphi consisted of 4 rounds, the first of which elicited examples of psychological contract breaches in an open-ended format. The ensuing 3 rounds consisting of a survey and anonymous feedback on aggregated group responses. Usable responses were obtained from 11 of 12 faculty members who completed the Delphi procedure. The final list of psychological contract breaches included 27 items, after modifications based on participant feedback in subsequent rounds. The psychological contract breach items generated in this study provide guidance for colleges and schools of pharmacy regarding important aspects of faculty recruitment, retention, and development.

  13. Contracting in vivo research: what are the issues?

    PubMed

    Underwood, Wendy J

    2007-07-01

    As a result of increasing internal and external pressures, research institutions are using contract research organizations for the conduct of in vivo research. Many issues arise when contracting animal research, including concern regarding animal health and welfare. Each sponsor institution should develop a program for outsourced in vivo research that evaluates and ensures appropriate care and use of research animals. Each sponsoring institution should consider establishing a policy and procedure for how outsourced in vivo studies will be approved, conducted, and monitored. An approved list of contract facilities can be established on the basis of accepted standards for animal care and use. Written contracts should include confidentiality agreements, the delineation of animal ownership, and the expectation to comply with all applicable regulations and guidelines for research animal care and use. Finally, a process for communication of adverse study or animal welfare events should be established. Thorough evaluation of contract organizations will help ensure appropriate research animal care and use.

  14. NASA Glenn Research Center Support of the ASRG Project

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Wong, Wayne A.

    2014-01-01

    A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

  15. HIPAA Business Associate Contracts: the value of contracts for case managers.

    PubMed

    Muller, Lynn S

    2003-01-01

    Case Managers are in the middle of the upcoming HIPAA regulation changes, with the issuance of the Final Privacy Rule. Every case obliges case managers to work with Individually Identifiable Health Information (IIHI) and Protected Health Information (PHI). The purpose of this article is to provide case managers in all practice settings with a clear understanding of a "Business Associate," of a "Covered Entity," and of the specifics of a Business Associate Contract. This information will demonstrate how case managers can benefit from the use of these contracts in their business life. As an essential component of an organization's compliance plan, Business Associate Contracts can become a sword or a shield. This article is particularly helpful to case managers in independent practice, as well as those who work for Covered Entities.

  16. An efficient matrix-matrix multiplication based antisymmetric tensor contraction engine for general order coupled cluster.

    PubMed

    Hanrath, Michael; Engels-Putzka, Anna

    2010-08-14

    In this paper, we present an efficient implementation of general tensor contractions, which is part of a new coupled-cluster program. The tensor contractions, used to evaluate the residuals in each coupled-cluster iteration are particularly important for the performance of the program. We developed a generic procedure, which carries out contractions of two tensors irrespective of their explicit structure. It can handle coupled-cluster-type expressions of arbitrary excitation level. To make the contraction efficient without loosing flexibility, we use a three-step procedure. First, the data contained in the tensors are rearranged into matrices, then a matrix-matrix multiplication is performed, and finally the result is backtransformed to a tensor. The current implementation is significantly more efficient than previous ones capable of treating arbitrary high excitations.

  17. Program and Management Support for the Office of Military Performance Assessment Technology

    DTIC Science & Technology

    1992-04-03

    AD-A267 285 CONTRACT NO: DAMD17-90-C-0061 TITLE: PROGRAM AND MANAGEMENT SUPPORT FOR THE OFFICE OF MILITARY PERFORMANCE ASSESSMENT TECHNOLOGY...1204. Arlington, VA 22202-4302. and to the Office of Management and Budget. Paperwork Reduction Projet (0704-0188). Washington, DC 20503 1. AGENCY USE...NUMBERS Program and Management Support for the Office of Contract No. Military Performance Assessment Technology DAMDI7-90-C-0061 6. AUTHOR(S) Marvin

  18. Treatment of TBI with Hormonal and Pharmacological Support, Preclinical Validation Using Diffuse and Mechanical TBI Animal Models

    DTIC Science & Technology

    2016-05-01

    Award Number: PT075653 (grant) W81XWH-08-2-0153 (contract) TITLE: Treatment of TBI with Hormonal and Pharmacological Support, Preclinical...TITLE AND SUBTITLE 5a. CONTRACT NUMBER W81XWH-08-2-0153 Treatment of TBI with Hormonal and Pharmacological Support, Preclinical Validation Using...rats. Our in vivo tests also included MRI imaging, focusing on edema resolution and reduction of diffuse axonal damage (fractional anisotropy

  19. Crystal Growth Furnace (CGF)

    NASA Technical Reports Server (NTRS)

    Billingsley, Charles E.; Frederick, Larry

    1993-01-01

    The contract baseline, contract requirements review, contract modifications, contract problem areas and conclusions are addressed. Contract baseline was established 11 June 1987 and updated 1 December 1989. Significant changes were introduced into the 1989 baseline as compared to the original baseline. Contract modifications were made to add requirements as the program matured and as definition of requirements were completed. Problems were solved in real time through the contractor/customer team involvement and relationship to assure a timely and successful mission. The conclusion is that the CGF performed as designed and the experiments performed during the USML-1 Mission supports the conclusion.

  20. Patient Protection and Affordable Care Act; establishment of the Multi-State Plan Program for the Affordable Insurance Exchanges. Final rule.

    PubMed

    2014-02-24

    The U.S. Office of Personnel Management (OPM) is issuing a final rule implementing modifications to the Multi-State Plan (MSP) Program based on the experience of the Program to date. OPM established the MSP Program pursuant to the Affordable Care Act. This rule clarifies the approach used to enforce the applicable standards of the Affordable Care Act with respect to health insurance issuers that contract with OPM to offer MSP options; amends MSP standards related to coverage area, benefits, and certain contracting provisions under section 1334 of the Affordable Care Act; and makes non-substantive technical changes.

  1. The Independent Technical Analysis Process Final Report 2006-2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related tomore » juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161 Disseminate Raw/Summary Data and Results - Post technical products on the ITAP web site. (6) 185-Produce Pisces Status Report - Provide periodic status reports to BPA. (7) 119 Manage and Administer Projects - project/contract administration.« less

  2. SEDSAT

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Under this contract the Students for the Exploration and Development of Space Satellite number One (SEDSAT-1 or just SEDSAT) was completed and launched on 24-Oct-98. It achieved nominal orbit and activated its transponders after Delta II separation. Telemetry has indicated the internal systems are normal. However, SEDSAT has not responded to subsequent uplink commands. Telemetry has continued to be received allowing evaluation of bus performance and attempts at anomaly resolution. Anomaly resolution will continue during 1999 subsequent to the end of this contract. This final report documents activities under the contract period.

  3. Research on air and missile defense task allocation based on extended contract net protocol

    NASA Astrophysics Data System (ADS)

    Zhang, Yunzhi; Wang, Gang

    2017-10-01

    Based on the background of air and missile defense distributed element corporative engagement, the interception task allocation problem of multiple weapon units with multiple targets under network condition is analyzed. Firstly, a mathematical model of task allocation is established by combat task decomposition. Secondly, the initialization assignment based on auction contract and the adjustment allocation scheme based on swap contract were introduced to the task allocation. Finally, through the simulation calculation of typical situation, the model can be used to solve the task allocation problem in complex combat environment.

  4. KSC-2014-4074

    NASA Image and Video Library

    2014-09-22

    CAPE CANAVERAL, Fla. – A crane is used to move the final large steel beam into position for installation on the base of the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA's Kennedy Space Center in Florida. Construction workers on lifts monitor the progress to begin attaching the final large beam to the ML structure. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first uncrewed mission, Exploration Mission-1, in 2018. Photo credit: NASA/Daniel Casper

  5. 48 CFR 370.401 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is HHS policy that contracting activities shall not award a contract involving live vertebrate.../PHS-supported or HHS/PHS-conducted activities involving the care and use of live vertebrate animals...

  6. Flight set 360L007 (STS-33) insulation component. Volume 3: Final release

    NASA Technical Reports Server (NTRS)

    Hicken, Steve

    1990-01-01

    Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.

  7. [Boundaries and integrity in the "Social Contract for Spanish Science", 1907-1939].

    PubMed

    Gómez, Amparo

    2014-01-01

    This article analyzes the relationship between science and politics in Spain in the early 20th century from the perspective of the Social Contract for Science. The article shows that a genuine social contract for science was instituted in Spain during this period, although some boundary and integrity problems emerged. These problems are analyzed, showing that the boundary problems were a product of the conservative viewpoint on the relationship between science and politics, while the integrity problems involved the activation of networks of influence in the awarding of scholarships to study abroad. Finally, the analysis reveals that these problems did not invalidate the Spanish social contract for science.

  8. 48 CFR 15.407-1 - Defective certified cost or pricing data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracting officer shall immediately bring the matter to the attention of the prospective contractor, whether... bring the character of the data to the attention of the contracting officer; (iii) The contract was... change order). (5) An offset shall be allowed only in an amount supported by the facts and if the...

  9. 13 CFR 126.607 - When must a contracting officer set aside a requirement for qualified HUBZone SBCs?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... fair market prices. This requirement does not preclude a contracting officer from setting aside a... will be made at fair market prices. However, after conducting market research, the contracting officer... to support the specific set-aside, including the type and extent of market research conducted. In...

  10. Contingency Contracting and Operant Behavior Change: An Exercise in Applied Behavior Analysis.

    ERIC Educational Resources Information Center

    Mann, Ronald A.

    Until recently, the use of contingency contracting has been largely an issue of theory and discussion with little experimental research evidence gathered to support efficacy. Two major reasons for this problem are suggested and discussed: (1) the concept of contingency contracting has not been adequately defined nor its minimal requirements…

  11. [Operation/Maintenance of Fiber Placement Machine

    NASA Technical Reports Server (NTRS)

    Pelham, L.; Dillard, T.

    2000-01-01

    NASA contract NAS8-39749 was completed in January 2000. The contract period of performance covered six (6) years and included basic program technical support as required by NASA with up to thirty (30) different technical directives identified and issued by NASA for specific Advanced Composite Technology tasks during the course of the contract.

  12. Social contract and social integration in adolescent development.

    PubMed

    Hilles, W S; Kahle, L R

    1985-10-01

    Eighty-nine subjects from two high schools were tested during the spring of their sophomore and senior years, when their mean ages were 16 years, 1 month, and 18 years, 1 month, respectively. Composites measured social contract with: (a) independence, (b) implicit social contract, societal norms and expectations, and (c) explicit social contracts, rules. Composites and single items measured social integration with: (d) role commitment, (e) social-American Dream, accepting the belief in the American Dream that hard work would lead to social success, (f) self-American Dream, belief that hard work will produce personal satisfaction and success, (g) raw deal, perceptions of being treated unfairly, (h) self-blame, and (i) feelings of hopelessness. The results of the cross-lagged panel correlations generally support the hypothesis that students respond to implicit social contracts through role commitment, which is further expressed by a belief in the American Dream for social fulfillment, while responding to the perception of explicit social contracts by not believing in the benefits of the American Dream for personal fulfillment. These results were interpreted as supporting Dienstbier's theory of moral development.

  13. Psychological contracts of hospice nurses.

    PubMed

    Jones, Audrey Elizabeth; Sambrook, Sally

    2010-12-01

    Psychological contracts have been described as individuals' beliefs regarding the obligations, expectations, and contributions that exist between them and their employer. They can be influenced by the organization's culture and philosophy, through human resources policies, and through the employee's personality and characteristics. Owing to the recent economic crisis, hospices in the UK are currently in a transitional phase and are being expected to demonstrate efficiencies that might be more in line with a business model than a health-care environment. This may conflict with the philosophical views of hospice nurses. To support nurses through this transition, it might be helpful to understand the antecedents of hospice nurses' behaviour and how they construct their psychological contracts. Failure to offer adequate support might lead to negative outcomes such as a desire to leave the organisation, poorer quality work, or disruptive behaviour. This study used a modified grounded theory approach involving in-depth interviews to explore the context and content of the psychological contracts of hospice nurses in the UK. Four main themes emerged: the types of psychological contracts formed, how the contracts are formed, their contents, and the breaches and potential violations the nurses perceive.

  14. 77 FR 143 - New Postal Product

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... information under seal. In the Statement of Supporting Justification, Dennis R. Nicoski, Manager, Field Sales Strategy and Contracts, asserts that the contract will cover its attributable costs, make a positive...

  15. 77 FR 69598 - Procurement List Proposed Addition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... Support, Directorate of Public Works, Fort Lee, Virginia. NPA: Skookum Educational Programs, Bremerton, WA Contracting Activity: Mission and Installation Contracting Command-- Fort Lee, Fort Lee, VA Barry S. Lineback...

  16. Recruitment of Physicians for the Active Army, 1975-1980

    DTIC Science & Technology

    1975-06-06

    its supporting assets includinF the personnel counselor system and contract advertising capabilities: and, (4) comparison of physician pro curement...any criti- cism directed toward recruitment efforts has inhibited the use of available assets to include common corvmercial advertising techniques. 1 4...current Army procurement system and its supporting assets including the personnel counselor system ana contract advertising capabil- ities; and, (4

  17. Analysis of Contemporary Contingency Contracting Educational Resources

    DTIC Science & Technology

    2010-12-01

    Afghanistan by providing base operations support (e.g., food and housing); communication services; tactical and nontactical vehicle maintenance...Contingency Contracting Handbook on which it is based) and CON 334, mentioned earlier, are widely accessible to all acquisition communities across the DoD...missions, and humanitarian relief efforts. The services provided include base operations support (e.g., food and housing), communication services

  18. Wine and Coca Cola: Serendipity and Entrepreneurial success

    NASA Astrophysics Data System (ADS)

    Wyatt, Philip

    2007-03-01

    Starting a new company from scratch depends critically on identifying a product for which there will be enough demand to generate a profit after a reasonable time period. Many start-ups nowadays obtain early Government grants or contracts (e. g. the so-called SBIR programs), but until such contracts begin (if ever!) to provide positive cash flow, a source of other funds become essential. Despite contracts, venture capital, and some friends willing to ``gamble,'' our first entrepreneurial venture ended not with a bang, but a whimper! We had chosen the wrong market. On the day before the company closed its doors, an unanticipated event occurred. We had opened a few bottles of wine for our final farewell but, as we began drinking, we decided to study their laser-scattering properties with our unappreciated and failed instrumentation. The resulting press coverage of a paper reporting that ``tasting'' was phenomenal, though it was published too late to save the company. Starting a second entrepreneurial venture was far more difficult as the first ``angels'' were nowhere to be found. A forgotten proposal by that failed first venture was suddenly funded providing, thereby, the means to start the second. As the second venture began, the success of the wine paper suggested that trying the same method with cola drinks might prove interesting. A new paper reporting on those results was immediately picked up by Applied Optics for an issue cover. At first, a particular cola manufacturer was not amused. However, it soon recognized the significance of laser scattering and began to contribute to the Company's support. Complemented by their largesse and the newly funded contract, the Company's instrumentation commercialization programs became sharply focused: refine the development and sale of a new type of absolute light scattering photometer incorporating a laser. We never looked back.

  19. Activating clinical trials: a process improvement approach.

    PubMed

    Martinez, Diego A; Tsalatsanis, Athanasios; Yalcin, Ali; Zayas-Castro, José L; Djulbegovic, Benjamin

    2016-02-24

    The administrative process associated with clinical trial activation has been criticized as costly, complex, and time-consuming. Prior research has concentrated on identifying administrative barriers and proposing various solutions to reduce activation time, and consequently associated costs. Here, we expand on previous research by incorporating social network analysis and discrete-event simulation to support process improvement decision-making. We searched for all operational data associated with the administrative process of activating industry-sponsored clinical trials at the Office of Clinical Research of the University of South Florida in Tampa, Florida. We limited the search to those trials initiated and activated between July 2011 and June 2012. We described the process using value stream mapping, studied the interactions of the various process participants using social network analysis, and modeled potential process modifications using discrete-event simulation. The administrative process comprised 5 sub-processes, 30 activities, 11 decision points, 5 loops, and 8 participants. The mean activation time was 76.6 days. Rate-limiting sub-processes were those of contract and budget development. Key participants during contract and budget development were the Office of Clinical Research, sponsors, and the principal investigator. Simulation results indicate that slight increments on the number of trials, arriving to the Office of Clinical Research, would increase activation time by 11 %. Also, incrementing the efficiency of contract and budget development would reduce the activation time by 28 %. Finally, better synchronization between contract and budget development would reduce time spent on batching documentation; however, no improvements would be attained in total activation time. The presented process improvement analytic framework not only identifies administrative barriers, but also helps to devise and evaluate potential improvement scenarios. The strength of our framework lies in its system analysis approach that recognizes the stochastic duration of the activation process and the interdependence between process activities and entities.

  20. Final Environmental Assessment, Horse Creek Bridge Replacement

    DTIC Science & Technology

    2010-10-01

    Final Environmental Assessment Horse Creek Bridge Replacement 78th Civil Engineer Group...Final Environmental Assessment Horse Creek Bridge Replacement 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FINDING OF NO SIGNIFICANT IMPACT (FONSI)/ FINDING OF NO PRACTICABLE ALTERNATIVE (FONP A) HORSE

  1. Final Closeout Report University Research Program in Robotics for Environmental Restoration and Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James S. Tulenko; Carl Crane

    2004-08-24

    The report covers the 2003-04 contract period, with a retrospective of the 11 years for the contract, from 1993 to 2004. This includes personnel, technical publications and reports, plus research laboratories employed. Specific information is given in eight research areas, reporting on all technology developed and/or deployed by the University of Florida.

  2. 78 FR 13766 - Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour Contracts and Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ..., Sequence 1] RIN 9000-AM28 Federal Acquisition Regulation; Changes to Time-and-Materials and Labor-Hour... raising the ceiling price or otherwise changing the scope of work for a time-and-materials (T&M) or labor... summarized as follows: In finalizing FAR rule 2009-043 Time-and-Materials and Labor- Hour Contracts for...

  3. DELTA-DIESEL ENGINE LIGHT TRUCK APPLICATION Contract DE-FC05-97OR22606 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hakim, Nabil Balnaves, Mike

    2003-05-27

    DELTA Diesel Engine Light Truck Application End of Contract Report DE-FC05-97-OR22606 EXECUTIVE SUMMARY This report is the final technical report of the Diesel Engine Light Truck Application (DELTA) program under contract DE-FC05-97-OR22606. During the course of this contract, Detroit Diesel Corporation analyzed, designed, tooled, developed and applied the ''Proof of Concept'' (Generation 0) 4.0L V-6 DELTA engine and designed the successor ''Production Technology Demonstration'' (Generation 1) 4.0L V-6 DELTA engine. The objectives of DELTA Program contract DE-FC05-97-OR22606 were to: Demonstrate production-viable diesel engine technologies, specifically intended for the North American LDT and SUV markets; Demonstrate emissions compliance with significant fuelmore » economy advantages. With a clean sheet design, DDC produced the DELTA engine concept promising the following attributes: 30-50% improved fuel economy; Low cost; Good durability and reliability; Acceptable noise, vibration and harshness (NVH); State-of-the-art features; Even firing, 4 valves per cylinder; High pressure common rail fuel system; Electronically controlled; Turbocharged, intercooled, cooled EGR; Extremely low emissions via CLEAN Combustion{copyright} technology. To demonstrate the engine technology in the SUV market, DDC repowered a 1999 Dodge Durango with the DELTA Generation 0 engine. Fuel economy improvements were approximately 50% better than the gasoline engine replaced in the vehicle.« less

  4. Contract Specialist Turnover Rate and Contract Management Maturity in the National Capital Region Contracting Center: An Analysis

    DTIC Science & Technology

    2009-12-01

    interviews with separating employees to obtain this information (Mathis & Jackson, 2003, pp. 90-91). Management should also measure the ‘internal churn rate...Sullivan, 2009). This is a measure of internal transfers from one department to others. High internal churn rates in particular areas may...contracting support and service throughout the National Capital Region” (CCE, 2009). Among other things, CCE provides telecommunication equipment and

  5. Defense Contracting in Iraq: Issues and Options for Congress

    DTIC Science & Technology

    2008-05-06

    ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public...contract calls for the three companies to compete for task orders; each company may be awarded up to $5 billion for troop support services per year , the...contracting. The Fiscal Year (FY) 2008 Defense Authorization Act (P.L. 110-181) contains provisions that address contract waste, fraud, abuse, and

  6. An Analysis of Contracting Actions by United States Based Department of Defense Organizations to Support Operations Desert Shield and Desert Storm

    DTIC Science & Technology

    1992-09-01

    suggest that certain regulations should be considered for changes or waivers that go into effect during military contingencies. Also, there are...within the DOD to contractually support ODS has the potential to aid in educating contracting professionals to effectively and efficiently support a...operations to free Kuwait by enacting sanctions against Iraq. Only when it 10 became apparent that the sanctions were having no effect were military

  7. Superfund Contract Laboratory Program

    EPA Pesticide Factsheets

    The Contract Laboratory Program (CLP) is a national network of EPA personnel, commercial laboratories, and support contractors whose primary mission is to provide data of known and documented quality to the Superfund program.

  8. RTEMS SMP and MTAPI for Efficient Multi-Core Space Applications on LEON3/LEON4 Processors

    NASA Astrophysics Data System (ADS)

    Cederman, Daniel; Hellstrom, Daniel; Sherrill, Joel; Bloom, Gedare; Patte, Mathieu; Zulianello, Marco

    2015-09-01

    This paper presents the final result of an European Space Agency (ESA) activity aimed at improving the software support for LEON processors used in SMP configurations. One of the benefits of using a multicore system in a SMP configuration is that in many instances it is possible to better utilize the available processing resources by load balancing between cores. This however comes with the cost of having to synchronize operations between cores, leading to increased complexity. While in an AMP system one can use multiple instances of operating systems that are only uni-processor capable, a SMP system requires the operating system to be written to support multicore systems. In this activity we have improved and extended the SMP support of the RTEMS real-time operating system and ensured that it fully supports the multicore capable LEON processors. The targeted hardware in the activity has been the GR712RC, a dual-core core LEON3FT processor, and the functional prototype of ESA's Next Generation Multiprocessor (NGMP), a quad core LEON4 processor. The final version of the NGMP is now available as a product under the name GR740. An implementation of the Multicore Task Management API (MTAPI) has been developed as part of this activity to aid in the parallelization of applications for RTEMS SMP. It allows for simplified development of parallel applications using the task-based programming model. An existing space application, the Gaia Video Processing Unit, has been ported to RTEMS SMP using the MTAPI implementation to demonstrate the feasibility and usefulness of multicore processors for space payload software. The activity is funded by ESA under contract 4000108560/13/NL/JK. Gedare Bloom is supported in part by NSF CNS-0934725.

  9. Leucine-Enriched Essential Amino Acids Augment Muscle Glycogen Content in Rats Seven Days after Eccentric Contraction

    PubMed Central

    Kato, Hiroyuki; Miura, Kyoko; Suzuki, Katsuya; Bannai, Makoto

    2017-01-01

    Eccentric contractions induce muscle damage, which impairs recovery of glycogen and adenosine tri-phosphate (ATP) content over several days. Leucine-enriched essential amino acids (LEAAs) enhance the recovery in muscles that are damaged after eccentric contractions. However, the role of LEAAs in this process remains unclear. We evaluated the content in glycogen and high energy phosphates molecules (phosphocreatine (PCr), adenosine di-phosphate (ADP) and ATP) in rats that were following electrically stimulated eccentric contractions. Muscle glycogen content decreased immediately after the contraction and remained low for the first three days after the stimulation, but increased seven days after the eccentric contraction. LEAAs administration did not change muscle glycogen content during the first three days after the contraction. Interestingly, however, it induced a further increase in muscle glycogen seven days after the stimulation. Contrarily, ATP content decreased immediately after the eccentric contraction, and remained lower for up to seven days after. Additionally, LEAAs administration did not affect the ATP content over the experimental period. Finally, ADP and PCr levels did not significantly change after the contractions or LEAA administration. LEAAs modulate the recovery of glycogen content in muscle after damage-inducing exercise. PMID:29065533

  10. Leucine-Enriched Essential Amino Acids Augment Muscle Glycogen Content in Rats Seven Days after Eccentric Contraction.

    PubMed

    Kato, Hiroyuki; Miura, Kyoko; Suzuki, Katsuya; Bannai, Makoto

    2017-10-23

    Eccentric contractions induce muscle damage, which impairs recovery of glycogen and adenosine tri-phosphate (ATP) content over several days. Leucine-enriched essential amino acids (LEAAs) enhance the recovery in muscles that are damaged after eccentric contractions. However, the role of LEAAs in this process remains unclear. We evaluated the content in glycogen and high energy phosphates molecules (phosphocreatine (PCr), adenosine di-phosphate (ADP) and ATP) in rats that were following electrically stimulated eccentric contractions. Muscle glycogen content decreased immediately after the contraction and remained low for the first three days after the stimulation, but increased seven days after the eccentric contraction. LEAAs administration did not change muscle glycogen content during the first three days after the contraction. Interestingly, however, it induced a further increase in muscle glycogen seven days after the stimulation. Contrarily, ATP content decreased immediately after the eccentric contraction, and remained lower for up to seven days after. Additionally, LEAAs administration did not affect the ATP content over the experimental period. Finally, ADP and PCr levels did not significantly change after the contractions or LEAA administration. LEAAs modulate the recovery of glycogen content in muscle after damage-inducing exercise.

  11. 48 CFR 23.704 - Application to Government-owned or -leased facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Contracting for Environmentally Preferable Products... and contracts for support services at a Government-owned or -operated facility include provisions that...

  12. 48 CFR 213.306 - SF 44, Purchase Order-Invoice-Voucher.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION...) Transactions in support of intelligence and other specialized activities addressed by Part 2.7 of Executive...

  13. Contracting Deployment Customer Guide.

    DTIC Science & Technology

    1996-12-01

    functional managers from the major commands expressed the need to develop a Customer Guide for contingency deployments which would standardize, simplify, and...streamline the support our Contingency Contracting Officers (CCOs) provide to our customers .

  14. [The state of the psychological contract and its relation with employees' psychological health].

    PubMed

    Gracia, Francisco Javier; Silla, Inmaculada; Peiró, José María; Fortes-Ferreira, Lina

    2006-05-01

    In the present paper the role of the state of the psychological contract to predict psychological health results is studied in a sample of 385 employees of different Spanish companies. Results indicate that the state of the psychological contract significantly predicts life satisfaction, work-family conflict and well-being beyond the prediction produced by the content of the psychological contract. In addition, trust and fairness, two dimensions of the state of psychological contract, all together contribute to explain these psychological health variables adding value to the role as predictor of fulfillment of the psychological contract. The results support the approach argued by Guest and colleagues.

  15. Choice of contracts in the British National Health Service: an empirical study.

    PubMed

    Chalkley, Martin; McVicar, Duncan

    2008-09-01

    Following major reforms of the British National Health Service (NHS) in 1990, the roles of purchasing and providing health services were separated, with the relationship between purchasers and providers governed by contracts. Using a mixed multinomial logit analysis, we show how this policy shift led to a selection of contracts that is consistent with the predictions of a simple model, based on contract theory, in which the characteristics of the health services being purchased and of the contracting parties influence the choice of contract form. The paper thus provides evidence in support of the practical relevance of theory in understanding health care market reform.

  16. GPHS-RTGs in support of the Cassini RTG Program

    NASA Astrophysics Data System (ADS)

    1995-04-01

    The technical progress achieved during the period 26 Sep. 1994 - 2 Apr. 1995 on Contract DE-AC03-91SF-18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described herein. Monthly technical activity for the period 27 Feb. - 2 Apr. 1995 is included in this progress report. The report addresses tasks, including: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and CAGO acquisition (capital funds).

  17. Design optimization of gas generator hybrid propulsion boosters

    NASA Technical Reports Server (NTRS)

    Weldon, Vincent; Phillips, Dwight U.; Fink, Lawrence E.

    1990-01-01

    A methodology used in support of a contract study for NASA/MSFC to optimize the design of gas generator hybrid propulsion booster for uprating the National Space Transportation System (NSTS) is presented. The objective was to compare alternative configurations for this booster approach, optimizing each candidate concept on different bases, in order to develop data for a trade table on which a final decision was based. The methodology is capable of processing a large number of independent and dependent variables, adjusting the overall subsystems characteristics to arrive at a best compromise integrated design to meet various specified optimization criteria subject to selected constraints. For each system considered, a detailed weight statement was generated along with preliminary cost and reliability estimates.

  18. PSAW/MicroSWIS [Microminiature Surface Acoustic Wave (SAW) based Wirelesss Instrumentation System

    NASA Technical Reports Server (NTRS)

    Heermann, Doug; Krug, Eric

    2004-01-01

    This Final Report for the PSAW/MicroSWIS Program is provided in compliance with contract number NAS3-01118. This report documents the overall progress of the program and presents project objectives, work carried out, and results obtained. Program Conceptual Design Package stated the following objectives: To develop a sensor/transceiver network that can support networking operations within spacecraft with sufficient bandwidth so that (1) flight control data, (2) avionics data, (3) payload/experiment data, and (4) prognostic health monitoring sensory information can flow to appropriate locations at frequencies that contain the maximum amount of information content but require minimum interconnect and power: a very high speed, low power, programmable modulation, spread-spectrum radio sensor/transceiver.

  19. Case Studies in Educational Performance Contracting. Part 3. Texarkana, Arkansas; Liberty-Eylau, Texas.

    ERIC Educational Resources Information Center

    Carpenter, Polly; And Others

    The Texarkana model of performance contracting consists of five major elements: (1) turnkeying of cost-effective new technology as a basic program goal, (2) use of a performance contract for instruction, (3) use of a management support contractor, (4) selection of the learning system contractor by formal competition, and (5) use of independent…

  20. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  1. Behavioral Health Services in the Changing Landscape of Private Health Plans.

    PubMed

    Horgan, Constance M; Stewart, Maureen T; Reif, Sharon; Garnick, Deborah W; Hodgkin, Dominic; Merrick, Elizabeth L; Quinn, Amity E

    2016-06-01

    Health plans play a key role in facilitating improvements in population health and may engage in activities that have an impact on access, cost, and quality of behavioral health care. Although behavioral health care is becoming more integrated with general medical care, its delivery system has unique aspects. The study examined how health plans deliver and manage behavioral health care in the context of the Affordable Care Act (ACA) and the 2008 Mental Health Parity and Addiction Equity Act (MHPAEA). This is a critical time to examine how health plans manage behavioral health care. A nationally representative survey of private health plans (weighted N=8,431 products; 89% response rate) was conducted in 2010 during the first year of MHPAEA, when plans were subject to the law but before final regulations, and just before the ACA went into effect. The survey addressed behavioral health coverage, cost-sharing, contracting arrangements, medical home innovations, support for technology, and financial incentives to improve behavioral health care. Coverage for inpatient and outpatient behavioral health services was stable between 2003 and 2010. In 2010, health plans were more likely than in 2003 to manage behavioral health care through internal arrangements and to contract for other services. Medical home initiatives were common and almost always included behavioral health, but financial incentives did not. Some plans facilitated providers' use of technology to improve care delivery, but this was not the norm. Health plans are key to mainstreaming and supporting delivery of high-quality behavioral health services. Since 2003, plans have made changes to support delivery of behavioral health services in the context of a rapidly changing environment.

  2. Quantum matter bounce with a dark energy expanding phase

    NASA Astrophysics Data System (ADS)

    Colin, Samuel; Pinto-Neto, Nelson

    2017-09-01

    Analyzing quantum cosmological scenarios containing one scalar field with exponential potential, we have obtained a universe model which realizes a classical dust contraction from very large scales, the initial repeller of the model, and moves to a stiff matter contraction near the singularity, which is avoided due to a quantum bounce. The universe is then launched in a stiff matter expanding phase, which then moves to a dark energy era, finally returning to the dust expanding phase, the final attractor of the model. Hence, one has obtained a nonsingular cosmological model where a single scalar field can describe both the matter contracting phase of a bouncing model, necessary to give an almost scale invariant spectrum of scalar cosmological perturbations, and a transient expanding dark energy phase. As the universe is necessarily dust dominated in the far past, usual adiabatic vacuum initial conditions can be easily imposed in this era, avoiding the usual issues appearing when dark energy is considered in bouncing models.

  3. Bioanalytical outsourcing strategy at Janssen Research and Development.

    PubMed

    Verhaeghe, Tom

    2014-05-01

    The times when all bioanalytical work was supported in-house are long behind us. In the modern bioanalytical laboratory, workload is divided between in-house support and outsourcing to contract research organizations. This paper outlines the outsourcing strategy of the Janssen-regulated bioanalytical group. Keeping the knowledge of the assay and the compound internally is a cornerstone of this strategy and is a driver for balancing the workload between the internal laboratory and contract laboratories. The number of contract laboratories that are being used is limited and criteria for selecting laboratories are discussed. Special attention is paid to the experience with outsourcing clinical studies to China.

  4. Advanced launch system. Advanced development oxidizer turbopump program

    NASA Technical Reports Server (NTRS)

    1993-01-01

    On May 19, 1989, Pratt & Whitney was awarded contract NAS8-37595 by the National Aeronautics and Space Administration, Marshall Space Flight Center, Huntsville Alabama for an Advanced Development Program (ADP) to design, develop and demonstrate a highly reliable low cost, liquid oxygen turbopump for the Advanced Launch System (ALS). The ALS had an overall goal of reducing the cost of placing payloads in orbit by an order of magnitude. This goal would require a substantial reduction in life cycle costs, with emphasis on recurring costs, compared to current launch vehicles. Engine studies supporting these efforts were made for the Space Transportation Main Engine (STME). The emphasis on low cost required design simplification of components and subsystems such that the ground maintenance and test operations was minimized. The results of the Oxygen Turbopump ADP technology effort would provide data to be used in the STME. Initially the STME baseline was a gas generator cycle engine with a vacuum thrust level of 580,000 lbf. This was later increased to 650,000 lbf and the oxygen turbopump design approach was changed to reflect the new thrust level. It was intended that this ADP program be conducted in two phases. Phase 1, a basic phase, would encompass the preliminary design effort, and Phase II, an optional contract phase to cover design, fabrication and test evaluation of an oxygen turbopump at a component test facility at the NASA John C. Stennis Space Center in Mississippi. The basic phase included preliminary design and analysis, evaluation of low cost concepts, and evaluation of fabrication techniques. The option phase included design of the pump and support hardware, analysis of the final configuration to ensure design integrity, fabrication of hardware to demonstrate low cost, DVS Testing of hardware to verify the design, assembly of the turbopump and full scale turbopump testing. In December 1990, the intent of this ADP to support the design and development was changed. The design effort for the oxygen turbopump became part of the STME Phase B contract. The status of the pump design funded through this ADP was presented at the Preliminary Design Review (PDR) at the MSFC on October 24, 1990. Advancements in the design of the pump were subsequently continued under the Phase B Contract. The emphasis of this ADP became the demonstration of individual technologies that would have the greatest potential for reducing the recurring cost and increasing reliability. In October of 1992, overall program funding was reduced and work on this ADP was terminated.

  5. Advanced launch system. Advanced development oxidizer turbopump program

    NASA Astrophysics Data System (ADS)

    1993-10-01

    On May 19, 1989, Pratt & Whitney was awarded contract NAS8-37595 by the National Aeronautics and Space Administration, Marshall Space Flight Center, Huntsville Alabama for an Advanced Development Program (ADP) to design, develop and demonstrate a highly reliable low cost, liquid oxygen turbopump for the Advanced Launch System (ALS). The ALS had an overall goal of reducing the cost of placing payloads in orbit by an order of magnitude. This goal would require a substantial reduction in life cycle costs, with emphasis on recurring costs, compared to current launch vehicles. Engine studies supporting these efforts were made for the Space Transportation Main Engine (STME). The emphasis on low cost required design simplification of components and subsystems such that the ground maintenance and test operations was minimized. The results of the Oxygen Turbopump ADP technology effort would provide data to be used in the STME. Initially the STME baseline was a gas generator cycle engine with a vacuum thrust level of 580,000 lbf. This was later increased to 650,000 lbf and the oxygen turbopump design approach was changed to reflect the new thrust level. It was intended that this ADP program be conducted in two phases. Phase 1, a basic phase, would encompass the preliminary design effort, and Phase II, an optional contract phase to cover design, fabrication and test evaluation of an oxygen turbopump at a component test facility at the NASA John C. Stennis Space Center in Mississippi. The basic phase included preliminary design and analysis, evaluation of low cost concepts, and evaluation of fabrication techniques. The option phase included design of the pump and support hardware, analysis of the final configuration to ensure design integrity, fabrication of hardware to demonstrate low cost, DVS Testing of hardware to verify the design, assembly of the turbopump and full scale turbopump testing. In December 1990, the intent of this ADP to support the design and development was changed. The design effort for the oxygen turbopump became part of the STME Phase B contract. The status of the pump design funded through this ADP was presented at the Preliminary Design Review (PDR) at the MSFC on October 24, 1990. Advancements in the design of the pump were subsequently continued under the Phase B Contract. The emphasis of this ADP became the demonstration of individual technologies that would have the greatest potential for reducing the recurring cost and increasing reliability. In October of 1992, overall program funding was reduced and work on this ADP was terminated.

  6. Summary of Environmental Data Analysis and Work Performed by Lawrence Livermore National Laboratory (LLNL) in Support of the Navajo Nation Abandoned Mine Lands Project at Tse Tah, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taffet, Michael J.; Esser, Bradley K.; Madrid, Victor M.

    This report summarizes work performed by Lawrence Livermore National Laboratory (LLNL) under Navajo Nation Services Contract CO9729 in support of the Navajo Abandoned Mine Lands Reclamation Program (NAMLRP). Due to restrictions on access to uranium mine waste sites at Tse Tah, Arizona that developed during the term of the contract, not all of the work scope could be performed. LLNL was able to interpret environmental monitoring data provided by NAMLRP. Summaries of these data evaluation activities are provided in this report. Additionally, during the contract period, LLNL provided technical guidance, instructional meetings, and review of relevant work performed by NAMLRPmore » and its contractors that was not contained in the contract work scope.« less

  7. Carbon Dioxide Removal and the futures market

    NASA Astrophysics Data System (ADS)

    Lockley, A.; Coffman, D.

    2016-12-01

    Futures contracts are exchange-traded financial instruments that enable parties to fix a price in advance, for performance on a contract at some later date. Forward contracts also entail future settlement, but they are traded over-the-counter between two independent parties. Both futures and forward contracts are commonly used in commodities trading, as producers seek financial security when planning production. We discuss the use of potential use of exchange-traded futures contracts in Carbon Dioxide Removal (CDR) markets. We conclude that they have one principal advantage (in that they give near-term price security to current polluters), and one principal disadvantage (in that a combination of high price volatility and high trade volume means contracts issued by the private sector may cause systemic economic risk). Accordingly, we note the potential for the development of futures markets in CDR, but urge great caution in the use of this approach. In particular, we consider the use of regulated markets: to ensure contracts are more reliable, and that moral hazard is minimised. Whilst regulation offers generally increased assurances, we identify major insufficiencies with this approach - finding it generally inadequate. In conclusion, we suggest that only governments can realistically support long-term CDR futures markets. We note existing long-term CDR plans by governments, and suggest the use of state-backed futures for supporting these assurances.

  8. Skills Conversion Project: Chapter 2, Executive Summary. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    This final report describes the Skills Conversion Project conducted by The National Society of Professional Engineers under contract to the Department of Labor to study methods of utilizing the large pool of highly skilled unemployed technicians and professional personnel who were formerly employed in the aerospace and defense industries. If…

  9. Structural Damage Prediction and Analysis for Hypervelocity Impact: Consulting

    NASA Technical Reports Server (NTRS)

    1995-01-01

    A portion of the contract NAS8-38856, 'Structural Damage Prediction and Analysis for Hypervelocity Impacts,' from NASA Marshall Space Flight Center (MSFC), included consulting which was to be documented in the final report. This attachment to the final report contains memos produced as part of that consulting.

  10. A model to decompose the performance of supplementary private health insurance markets.

    PubMed

    Leidl, Reiner

    2008-09-01

    For an individual insurance firm offering supplementary private health insurance, a model is developed to decompose market performance in terms of insurer profits. For the individual contract, the model specifies the conditions under which adverse selection, cream skimming, and moral hazard occur, shows the impact of information on contracting, and the profit contribution. Contracts are determined by comparing willingness to pay for insurance with the individual's risk position, and information on both sides of the market. Finally, performance is aggregated up to the total market. The model provides a framework to explain the attractiveness of supplementary markets to insurers.

  11. Quick-Reaction Report on the Audit of the Army Contract with the University of Texas at Austin Institute for Advanced Technology

    DTIC Science & Technology

    1992-10-27

    AD-A27O 238 T Of DTIC ELECTE 8OCT 06 1993 E O F F ICE OF THE 1NSPECTOR GENERAL QUICK REAC.7ION REPORT ON THE AUDIT OF THE ARMY CONTRACT WITH THE...ENGINEERING INSPECTOR GENERAL, DEPARTMENT OF TH, ARMY SUBJECT: Quick-Reaction Report on the Audit of the Army Contract with the University of Texas at Austin...comments on Recommendation 3. by November 27, 1992. The courtesies extended to the audit staff are appreciated. If you have any questions on this final

  12. Contracting for health and curative care use in Afghanistan between 2004 and 2005

    PubMed Central

    Arur, Aneesa; Peters, David; Hansen, Peter; Mashkoor, Mohammad Ashraf; Steinhardt, Laura C.; Burnham, Gilbert

    2010-01-01

    Afghanistan has used several approaches to contracting as part of its national strategy to increase access to basic health services. This study compares changes in the utilization of outpatient curative services from 2004 to 2005 between the different approaches for contracting-out services to non-governmental service providers, contracting-in technical assistance at public sector facilities, and public sector facilities that did not use contracting. We find that both contracting-in and contracting-out approaches are associated with substantial double difference increases in service use from 2004 to 2005 compared with non-contracted facilities. The double difference increase in contracting-out facilities for outpatient visits is 29% (P < 0.01), while outpatient visits from female patients increased 41% (P < 0.01), use by the poorest quintile increased 68% (P < 0.01) and use by children aged under 5 years increased 27% (P < 0.05). Comparing the individual contracting-out approaches, we find similar increases in outpatient visits when contracts are managed directly by the Ministry of Public Health compared with when contracts are managed by an experienced international non-profit organization. Finally, contracting-in facilities show even larger increases in all the measures of utilization other than visits from children under 5. Although there are minor differences in the results between contracting-out approaches, these differences cannot be attributed to a specific contracting-out approach because of factors limiting the comparability of the groups. It is nonetheless clear that the government was able to manage contracts effectively despite early concerns about their lack of experience, and that contracting has helped to improve utilization of basic health services. PMID:19850664

  13. The coordinating contracts of supply chain in a fuzzy decision environment.

    PubMed

    Sang, Shengju

    2016-01-01

    The rapid change of the product life cycle is making the parameters of the supply chain models more and more uncertain. Therefore, we consider the coordination mechanisms between one manufacturer and one retailer in a fuzzy decision marking environment, where the parameters of the models can be forecasted and expressed as the triangular fuzzy variables. The centralized decision-making system, two types of supply chain contracts, namely, the revenue sharing contract and the return contract are proposed. To obtain their optimal policies, the fuzzy set theory is adopted to solve these fuzzy models. Finally, three numerical examples are provided to analyze the impacts of the fuzziness of the market demand, retail price and salvage value of the product on the optimal solutions in two contracts. It shows that in order to obtain more fuzzy expected profits the retailer and the manufacturer should seek as low fuzziness of demand, high fuzziness of the retail price and the salvage value as possible in both contracts.

  14. On the habitability of universes without stable deuterium

    NASA Astrophysics Data System (ADS)

    Adams, Fred C.; Grohs, Evan

    2017-05-01

    In both stars and in the early universe, the production of deuterium is the first step on the way to producing heavier nuclei. If the strong force were slightly weaker, then deuterium would not be stable, and many authors have noted that nuclesynthesis would be compromised so that helium production could not proceed through standard reaction chains. Motivated by the possibility that other regions of space-time could have different values for the fundamental constants, this paper considers stellar evolution in universes without stable deuterium and argues that such universes can remain habitable. Even in universes with no stellar nucleosynthesis, stars can form and will generate energy through gravitational contraction. Using both analytic estimates and a state-of-the-art stellar evolution code, we show that such stars can be sufficiently luminous and long-lived to support life. Stars with initial masses that exceed the Chandrasekhar mass cannot be supported by degeneracy pressure and will explode at the end of their contraction phase. The resulting explosive nucleosynthesis can thus provide the universe with some heavy elements. We also explore the possibility that helium can be produced in stellar cores through a triple-nucleon reaction that is roughly analogous to the triple-alpha reaction that operates in our universe. Stars burning hydrogen through this process are somewhat hotter than those in our universe, but otherwise play the same role. Next we show that with even trace amounts (metallicity Z ∼10-10) of heavy elements - produced through the triple-nucleon process or by explosive nucleosynthesis - the CNO cycle can operate and allow stars to function. Finally, we consider Big Bang Nucleosynthesis without stable deuterium and find that only trace amounts of helium are produced, with even smaller abundances of other nuclei. With stars evolving through gravitational contraction, explosive nucleosynthesis, the triple-nucleon reaction, and the CNO cycle, universes with no stable deuterium are thus potentially habitable, contrary to many previous claims.

  15. Effect of Contract Research Organization Bureaucracy in Clinical Trial Management: A Model From Lung Cancer.

    PubMed

    Gobbini, Elisa; Pilotto, Sara; Pasello, Giulia; Polo, Valentina; Di Maio, Massimo; Arizio, Francesca; Galetta, Domenico; Petrillo, Patrizia; Chiari, Rita; Matocci, Roberta; Di Costanzo, Alessandro; Di Stefano, Teresa Severina; Aglietta, Massimo; Cagnazzo, Celeste; Sperduti, Isabella; Bria, Emilio; Novello, Silvia

    2018-03-01

    Contract research organization (CRO) support is largely included in clinical trial management, although its effect in terms of time savings and benefit has not yet been quantified. We performed a retrospective multicenter analysis of lung cancer trials to explore differences in term of trial activation timelines and accrual for studies with and without CRO involvement. Results regarding study timelines from feasibility data to first patient enrollment were collected from 7 Italian thoracic oncology departments. The final accruals (screened/enrolled patients) are reported. We considered CRO/sponsor-administered and CRO-free trials according to who was responsible for the management of the crucial setup phases. Of 113 trials, 62 (54.9%) were CRO-administered, 34 (30.1%) were sponsor-administered, and 17 (15.0%) were CRO-free. The median time from feasibility invitation to documentation obtainment was 151 days in the CRO-administered trials versus 128 in the sponsor-administered and 120 in the CRO-free trials. The time from document submission to contract signature was 142 days in the CRO-administered versus 128 in the sponsor-administered and 132 in the CRO-free trials. The time from global accrual opening to first patient enrollment was 247 days for the CRO-administered versus 194 in the sponsor-administered and 151 in the CRO-free trials. No significant differences were observed in terms of the median overall timeline: 21 months in the CRO-administered, 15 in the sponsor-administered, and 18 months in the CRO-free studies (P = .29). Although no statistically significant differences were identified, the results of our analysis support the idea that bureaucratic procedures might require more time in CRO-administered trials than in sponsor-administered and CRO-free studies. This bureaucratic delay could negatively affect Italian patients' screening and enrollment compared with other countries. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Breaking sarcomeres by in vitro exercise

    PubMed Central

    Orfanos, Zacharias; Gödderz, Markus P. O.; Soroka, Ekaterina; Gödderz, Tobias; Rumyantseva, Anastasia; van der Ven, Peter F. M.; Hawke, Thomas J.; Fürst, Dieter O.

    2016-01-01

    Eccentric exercise leads to focal disruptions in the myofibrils, referred to as “lesions”. These structures are thought to contribute to the post-exercise muscle weakness, and to represent areas of mechanical damage and/or remodelling. Lesions have been investigated in human biopsies and animal samples after exercise. However, this approach does not examine the mechanisms behind lesion formation, or their behaviour during contraction. To circumvent this, we used electrical pulse stimulation (EPS) to simulate exercise in C2C12 myotubes, combined with live microscopy. EPS application led to the formation of sarcomeric lesions in the myotubes, resembling those seen in exercised mice, increasing in number with the time of application or stimulation intensity. Furthermore, transfection with an EGFP-tagged version of the lesion and Z-disc marker filamin-C allowed us to observe the formation of lesions using live cell imaging. Finally, using the same technique we studied the behaviour of these structures during contraction, and observed them to be passively stretching. This passive behaviour supports the hypothesis that lesions contribute to the post-exercise muscle weakness, protecting against further damage. We conclude that EPS can be reliably used as a model for the induction and study of sarcomeric lesions in myotubes in vitro. PMID:26804343

  17. Medicare Program; End-Stage Renal Disease Prospective Payment System, Coverage and Payment for Renal Dialysis Services Furnished to Individuals With Acute Kidney Injury, End-Stage Renal Disease Quality Incentive Program, Durable Medical Equipment, Prosthetics, Orthotics and Supplies Competitive Bidding Program Bid Surety Bonds, State Licensure and Appeals Process for Breach of Contract Actions, Durable Medical Equipment, Prosthetics, Orthotics and Supplies Competitive Bidding Program and Fee Schedule Adjustments, Access to Care Issues for Durable Medical Equipment; and the Comprehensive End-Stage Renal Disease Care Model. Final rule.

    PubMed

    2016-11-04

    This rule updates and makes revisions to the End-Stage Renal Disease (ESRD) Prospective Payment System (PPS) for calendar year 2017. It also finalizes policies for coverage and payment for renal dialysis services furnished by an ESRD facility to individuals with acute kidney injury. This rule also sets forth requirements for the ESRD Quality Incentive Program, including the inclusion of new quality measures beginning with payment year (PY) 2020 and provides updates to programmatic policies for the PY 2018 and PY 2019 ESRD QIP. This rule also implements statutory requirements for bid surety bonds and state licensure for the Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) Competitive Bidding Program (CBP). This rule also expands suppliers' appeal rights in the event of a breach of contract action taken by CMS, by revising the appeals regulation to extend the appeals process to all types of actions taken by CMS for a supplier's breach of contract, rather than limit an appeal for the termination of a competitive bidding contract. The rule also finalizes changes to the methodologies for adjusting fee schedule amounts for DMEPOS using information from CBPs and for submitting bids and establishing single payment amounts under the CBPs for certain groupings of similar items with different features to address price inversions. Final changes also are made to the method for establishing bid limits for items under the DMEPOS CBPs. In addition, this rule summarizes comments on the impacts of coordinating Medicare and Medicaid Durable Medical Equipment for dually eligible beneficiaries. Finally, this rule also summarizes comments received in response to a request for information related to the Comprehensive ESRD Care Model and future payment models affecting renal care.

  18. Legal Services: Judge Advocate Legal Services

    DTIC Science & Technology

    1996-09-30

    14–14, page 41 Publicity • 14–15, page 41 Insignia • 14–16, page 41 Chapter 15 Contract Law Attorneys, page 43 General • 15–1, page 43 General...Duties • 15–2, page 43 Management • 15–3, page 43 Principles of contract law practice • 15–4, page 43 Contract disputes and litigation support • 15–5...legal matters; and (2) Resolving their personal legal problems whenever possible. m. Contract law responsibilities. TJAG will provide— (1) Technical

  19. For support of USAMRMC Biological Weapons Convention, treaty and statement implementation activities. Final report, 1 March 1996-28 February 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, J.

    Program of work to provide support to the Biological Arms Control Treaty Office (BACTO) of the U.S. Army Medical Research and Material Command (USAMRMC), in the development of Army and U.S. Government negotiation, implementation and compliance policies and preparations regarding potential verification and confidence measures for the 1975 Biological Weapons Convention (BWC) and related biological weapons agreements. Support services provided included the preparation of Army installations and commands for implementation of visits pursuant to the U.S./UK/Russian Trilateral Statement on BW. Support included site assistance visit, development of required facility documentation and briefings, identification of additional facilities potentially subject to access,more » and support to DOD development of guidelines, procedures, documentation, and other materials for the conduct of visits. Specific tasks under this contract included: identification and delineation of `Military Biological Facilities` and related activities at Army installations; development of visit implementation documentation for the Army; assessment of potentially at-risk equities and sensitivities at relevant facilities; facility staff training and preparation; and review and modification of facility inputs to annual BWC Confidence Building Measure Declarations. Also supported the provision of timely and critical technical support to the Joint Staff and OSD in the development of DoD negotiation biological arms control positions.« less

  20. Alcohol ignition interlock service support

    DOT National Transportation Integrated Search

    1992-12-01

    Author's abstract: This Technical Report was produced under Contract No. DTNH22-89-C-07009 for the National Highway Traffic Safety Administration. Under that same contract, a draft set of model specifications for Breath Alcohol Ignition Interlock Dev...

  1. Contracting With the Enemy: The Contracting Officer’s Dilemma

    DTIC Science & Technology

    2015-06-01

    forgery, bribery , etc. Intentionally misusing "Made in America" designation Other offenses indicating a lack of business integrity or honesty that...major risk associated with using local national contractors in contingency environments is the presence of business entities that may directly or...indirectly support adversarial forces. Entering into contracts with enemy-affiliated business entities creates significant contractual and security

  2. Contingency Contracting Customer Guide

    DTIC Science & Technology

    1996-12-01

    I CONTINGENCY CONTRACTING CUSTOMER GUIDE PROJECT NUMBER: LC9619100 PROJECT MANAGER: CAPT TOM SNYDER TEAM MEMBERS MAJ JOHN PERRY CAPT ROBBIN VAUGHN...Report 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Contracting Deployment Customer Guide 6. AUTHOR(S) Capt.Thomas J. Snyder, AFLMA/LGC, DSN 596-4085 7...individual customers on the process, the customer support guide provides the necessary explanations without straining valuable manpower resources. The

  3. Carbon dioxide removal and the futures market

    NASA Astrophysics Data System (ADS)

    Coffman, D.'Maris; Lockley, Andrew

    2017-01-01

    Futures contracts are exchange-traded financial instruments that enable parties to fix a price in advance, for later performance on a contract. Forward contracts also entail future settlement, but they are traded directly between two parties. Futures and forwards are used in commodities trading, as producers seek financial security when planning production. We discuss the potential use of futures contracts in Carbon Dioxide Removal (CDR) markets; concluding that they have one principal advantage (near-term price security to current polluters), and one principal disadvantage (a combination of high price volatility and high trade volume means contracts issued by the private sector may cause systemic economic risk). Accordingly, we note the potential for the development of futures markets in CDR, but urge caution about the prospects for market failure. In particular, we consider the use of regulated markets: to ensure contracts are more reliable, and that moral hazard is minimised. While regulation offers increased assurances, we identify major insufficiencies with this approach—finding it generally inadequate. In conclusion, we suggest that only governments can realistically support long-term CDR futures markets. We note existing long-term CDR plans by governments, and suggest the use of state-backed futures for supporting these assurances.

  4. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  5. The Structure and Dynamics of the Solar Corona

    NASA Technical Reports Server (NTRS)

    Mikic, Zoran

    2000-01-01

    This report covers technical progress during the third year of the NASA Space Physics Theory contract "The Structure and Dynamics of the Solar Corona," between NASA and Science Applications International Corporation, and covers the period June 16, 1998 to August 15, 1999. This is also the final report for this contract. Under this contract SAIC, the University of California, Irvine (UCI), and the Jet Propulsion Laboratory (JPL), have conducted research into theoretical modeling of active regions, the solar corona, and the inner heliosphere, using the MHD model. During the three-year duration of this contract we have published 49 articles in the scientific literature. These publications are listed in Section 3 of this report. In the Appendix we have attached reprints of selected articles. We summarize our progress during the third year of the contract. Full descriptions of our work can be found in the cited publications, a few of which are attached to this report.

  6. Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less

  7. SRM Internal Flow Test and Computational Fluid Dynamic Analysis. Volume 1; Major Task Summaries

    NASA Technical Reports Server (NTRS)

    Whitesides, R. Harold; Dill, Richard A.; Purinton, David C.

    1995-01-01

    During the four year period of performance for NASA contract, NASB-39095, ERC has performed a wide variety of tasks to support the design and continued development of new and existing solid rocket motors and the resolution of operational problems associated with existing solid rocket motor's at NASA MSFC. This report summarizes the support provided to NASA MSFC during the contractual period of performance. The report is divided into three main sections. The first section presents summaries for the major tasks performed. These tasks are grouped into three major categories: full scale motor analysis, subscale motor analysis and cold flow analysis. The second section includes summaries describing the computational fluid dynamics (CFD) tasks performed. The third section, the appendices of the report, presents detailed descriptions of the analysis efforts as well as published papers, memoranda and final reports associated with specific tasks. These appendices are referenced in the summaries. The subsection numbers for the three sections correspond to the same topics for direct cross referencing.

  8. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  9. Laboratory and Space Plasma Studies

    NASA Astrophysics Data System (ADS)

    Hyman, Ellis

    1996-08-01

    The work performed by Science Applications International Corporation (SAIC), encompasses a wide range of topics in experimental, computational, and analytical laboratory and space plasma physics. The accomplishments described in this report have been in support of the programs of the Laser Plasma Branch (Code 6730) and other segments of the Plasma Physics Division at the Naval Research Laboratory (NRL) and cover the period 27 September 1993 to August 1, 1996. SAIC's efforts have been supported by sub-contracts or consulting agreements with Pulse Sciences, Inc., Clark Richardson, and Biskup Consulting Engineers, Pharos Technical Enterprises, Plex Corporation, Cornell University, Stevens Institute of Technology, the University of Connecticut, Plasma Materials and Technologies, Inc., and GaSonics International, Inc. In the following discussions section we will describe each of the topics investigated and the results obtained. Much of the research work has resulted in journal publications and NRL Memorandum Reports in which the investigation is described in detail. These reports are included as Appendices to this Final Report.

  10. Modern Theories of Pelvic Floor Support : A Topical Review of Modern Studies on Structural and Functional Pelvic Floor Support from Medical Imaging, Computational Modeling, and Electromyographic Perspectives.

    PubMed

    Peng, Yun; Miller, Brandi D; Boone, Timothy B; Zhang, Yingchun

    2018-02-12

    Weakened pelvic floor support is believed to be the main cause of various pelvic floor disorders. Modern theories of pelvic floor support stress on the structural and functional integrity of multiple structures and their interplay to maintain normal pelvic floor functions. Connective tissues provide passive pelvic floor support while pelvic floor muscles provide active support through voluntary contraction. Advanced modern medical technologies allow us to comprehensively and thoroughly evaluate the interaction of supporting structures and assess both active and passive support functions. The pathophysiology of various pelvic floor disorders associated with pelvic floor weakness is now under scrutiny from the combination of (1) morphological, (2) dynamic (through computational modeling), and (3) neurophysiological perspectives. This topical review aims to update newly emerged studies assessing pelvic floor support function among these three categories. A literature search was performed with emphasis on (1) medical imaging studies that assess pelvic floor muscle architecture, (2) subject-specific computational modeling studies that address new topics such as modeling muscle contractions, and (3) pelvic floor neurophysiology studies that report novel devices or findings such as high-density surface electromyography techniques. We found that recent computational modeling studies are featured with more realistic soft tissue constitutive models (e.g., active muscle contraction) as well as an increasing interest in simulating surgical interventions (e.g., artificial sphincter). Diffusion tensor imaging provides a useful non-invasive tool to characterize pelvic floor muscles at the microstructural level, which can be potentially used to improve the accuracy of the simulation of muscle contraction. Studies using high-density surface electromyography anal and vaginal probes on large patient cohorts have been recently reported. Influences of vaginal delivery on the distribution of innervation zones of pelvic floor muscles are clarified, providing useful guidance for a better protection of women during delivery. We are now in a period of transition to advanced diagnostic and predictive pelvic floor medicine. Our findings highlight the application of diffusion tensor imaging, computational models with consideration of active pelvic floor muscle contraction, high-density surface electromyography, and their potential integration, as tools to push the boundary of our knowledge in pelvic floor support and better shape current clinical practice.

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  13. Psychological contracts and commitment amongst nurses and nurse managers: a discourse analysis.

    PubMed

    McCabe, T J; Sambrook, Sally

    2013-07-01

    Few studies explore the link between the psychological contracts and the commitment of nursing professionals in the healthcare sector, and how perceived breaches of the psychological contract can impact on nurses' commitment levels. This study explores the connections between the psychological contracts and organisational and professional commitment of nurses and nurse managers. Semi-structured interviews were conducted with nurses and nurse managers, to explore the connections between their psychological contracts and organisational and professional commitment. Large acute and small community organisation within the British National Health Service. 28 nurses and 11 nurse managers working within an acute and a community sector organisation - 20 and 19 in each organisation. Participants were selected through a process of purposive sampling, reflecting variations in terms of age, grade, ward and tenure. A discourse analysis was conducted on the qualitative data from the thirty nine semi-structured interviews. Two overall themes emerged, professional and managerial values. Professional values included the sub-themes: professional recognition; immediate work environment - leadership and peer support; professional development and progression. Sub-themes under managerial values included: involvement; general management; resource management. The findings suggest that nurses and nurse managers are governed by relational psychological contracts, underpinned by an affective and to a lesser extent normative commitment towards the nursing profession. They emphasise 'professional values', and professional commitment, as the basis for positive psychological contracts amongst nursing professionals. There was anecdotal evidence of relational psychological contract breach, with decreasing job satisfaction as the outcome of perceived psychological contract breach. Positive psychological contracts and commitment levels amongst nursing professionals can be supported by managers been aware and sensitive to nursing discourses, and managing their expectations through greater involvement and leadership development. Copyright © 2012 Elsevier Ltd. All rights reserved.

  14. Ultralow Noise Monolithic Quantum Dot Photonic Oscillators

    DTIC Science & Technology

    2013-10-28

    HBCU/MI) ULTRALOW NOISE MONOLITHIC QUANTUM DOT PHOTONIC OSCILLATORS LUKE LESTER UNIVERSITY OF NEW MEXICO 10/28/2013 Final Report DISTRIBUTION A...TELEPHONE NUMBER (Include area code) 24-10-2013 Final 01-06-2010 to 31-05-2013 Ultralow Noise Monolithic Quantum Dot Photonic Oscillators FA9550-10-1-0276...277-7647 Reset Grant Title: ULTRALOW NOISE MONOLITHIC QUANTUM DOT PHOTONIC OSCILLATORS Grant/Contract Number: FA9550-10-1-0276 Final Performance

  15. Fort Hood Army Internal Review Team: Final Report

    DTIC Science & Technology

    2010-08-04

    Report Date l August 4, 2010 Protecting our Army community at home & abroad Army Internal Review Team : Final Report Report Documentation Page Form...DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Fort Hood Army Internal Review Team : Final Report 5a. CONTRACT NUMBER 5b. GRANT...Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FoRt Hood Army Internal Review team : Final Report August 4, 2010 1 FoRt Hood Army

  16. 48 CFR 237.7300 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEFENSE SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Services of Students at Research and... intermittent services of students at institutions of higher learning for the purpose of providing technical support at Defense research and development laboratories (10 U.S.C. 2360). ...

  17. 48 CFR 1631.205-10 - Cost of money.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...

  18. 48 CFR 1631.205-10 - Cost of money.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 1631.205-10 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES..., the supplemental information supporting submitted costs (such as the Supplemental Schedule of...

  19. Analysis of Air Force Wartime Contracted Construction Project Performance

    DTIC Science & Technology

    2015-03-26

    Management, Volume 140. Branconi, C. v. & Loch, C. H., 2004. Contracting for major projects: eight business levers for top management. International ...Problems X Material Supply Problems X Poor Owner Management X X Poor Contractor Management X Corruption and Bribery X The USACE survey...Kremers, et al., 2010; GAO, 2014; Thibault, 2011). The final difference, corruption and bribery , was mentioned in the USACE study as well as by Kremers

  20. Point of Injury Sampling Technology for Battlefield Molecular Diagnostics

    DTIC Science & Technology

    2011-11-14

    Injury" Sampling Technology for Battlefield Molecular Diagnostics November 14, 2011 Sponsored by Defense Advanced Research Projects Agency (DOD...Date of Contract: April 25, 2011 Short Title of Work: "Point of Injury" Sampling Technology for Battlefield Molecular Diagnostics " Contract...PHASE I FINAL REPORT: Point of Injury, Sampling Technology for Battlefield Molecular Diagnostics . W31P4Q-11-C-0222 (UNCLASSIFIED) P.I: Bernardo

Top