Sample records for system implementation plan

  1. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    PubMed

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  2. Design and Implementation of the PMS Module for ’Argos’

    DTIC Science & Technology

    1989-12-01

    designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and benefits such a...analyzing, designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and... design and implementation. PMS is the system developed by the navy to provide each ship, department, and supervisor with the tools needed to plan

  3. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  4. Implementing Student Information Systems

    ERIC Educational Resources Information Center

    Sullivan, Laurie; Porter, Rebecca

    2006-01-01

    Implementing an enterprise resource planning system is a complex undertaking. Careful planning, management, communication, and staffing can make the difference between a successful and unsuccessful implementation. (Contains 3 tables.)

  5. Strategic Planning for Information Systems: The Evidence from a Successful Implementation in an Academic Setting.

    ERIC Educational Resources Information Center

    Carter, Richard B.; And Others

    1991-01-01

    Demonstrates how an information systems plan can be successfully developed and implemented within an academic setting. Six guidelines for information systems planning are provided; problems are identified and recommendations to address the problems are suggested; and information systems objectives are discussed, including business communications,…

  6. Exploring the Factors of an Enterprise Resource Planning System in a Local Government Organization

    ERIC Educational Resources Information Center

    Shaw, Bryan T.

    2012-01-01

    The enterprise resource planning (ERP) system industry accounts for $8.8 billion annually. Enterprise resource planning systems are not performing as expected due to implementation barriers, changes in job responsibilities, and access to information; 50% of all information technology failures are due to the implementation of ERP systems. Guided by…

  7. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    ERIC Educational Resources Information Center

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  8. PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.

  9. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  10. Setting Strategic Directions Using Critical Success Factors.

    ERIC Educational Resources Information Center

    Bourne, Bonnie; Gates, Larry; Cofer, James

    2000-01-01

    Describes implementation of a system-level planning model focused on institutional improvement and effectiveness at the University of Missouri. Details implementation of three phases of the strategic planning model (strategic analysis, strategic thinking/decision-making, and campus outreach/systems administration planning); identifies critical…

  11. Planning for the Global Earth Observation System of Systems (GEOSS)

    USGS Publications Warehouse

    Christian, E.

    2005-01-01

    The Group on Earth Observations was established to promote comprehensive, coordinated, and sustained Earth observations. Its mandate is to implement the Global Earth Observation System of Systems (GEOSS) in accord with the GEOSS 10-Year Implementation Plan and Reference Document. During the months over which the GEOSS Implementation Plan was developed, many issues surfaced and were addressed. This article discusses several of the more interesting or challenging of those issues-e.g. fitting in with existing organizations and securing stable funding - some of which have yet to be resolved fully as of this writing. Despite the relatively short period over which the Implementation Plan had to be developed, there is a good chance that the work undertaken will be influential for decades to come. ?? 2005 Elsevier Ltd. All rights reserved.

  12. Next Generation Air Transportation System : progress and challenges in planning and implementing the transformation of the National Airspace System : testimony before the Subcommittee on Aviation, Committee on Transportation and Infrastructure, U.S. Senat

    DOT National Transportation Integrated Search

    2010-04-21

    To prepare for future air traffic growth, the Federal Aviation Administration (FAA), including its Joint Planning and Development Office (JPDO) and Air Traffic Organization, is planning and implementing the Next Generation Air Transportation System (...

  13. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    ERIC Educational Resources Information Center

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  14. Implementing post-trial access plans for HIV prevention research.

    PubMed

    Paul, Amy; Merritt, Maria W; Sugarman, Jeremy

    2018-05-01

    Ethics guidance increasingly recognises that researchers and sponsors have obligations to consider provisions for post-trial access (PTA) to interventions that are found to be beneficial in research. Yet, there is little information regarding whether and how such plans can actually be implemented. Understanding practical experiences of developing and implementing these plans is critical to both optimising their implementation and informing conceptual work related to PTA. This viewpoint is informed by experiences with developing and implementing PTA plans for six large-scale multicentre HIV prevention trials supported by the HIV Prevention Trials Network. These experiences suggest that planning and implementing PTA often involve challenges of planning under uncertainty and confronting practical barriers to accessing healthcare systems. Even in relatively favourable circumstances where a tested intervention medication is approved and available in the local healthcare system, system-level barriers can threaten the viability of PTA plans. The aggregate experience across these HIV prevention trials suggests that simply referring participants to local healthcare systems for PTA will not necessarily result in continued access to beneficial interventions for trial participants. Serious commitments to PTA will require additional efforts to learn from future approaches, measuring the success of PTA plans with dedicated follow-up and further developing normative guidance to help research stakeholders navigate the complex practical challenges of realising PTA. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  15. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  16. Opportunity costs of implementing forest plans

    NASA Astrophysics Data System (ADS)

    Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.

    1989-01-01

    Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.

  17. Facilitating Ambulatory Electronic Health Record System Implementation: Evidence from a Qualitative Study

    PubMed Central

    Hefner, Jennifer; Robbins, Julie; Huerta, Timothy R.

    2013-01-01

    Background. Ambulatory care practices have increasing interest in leveraging the capabilities of electronic health record (EHR) systems, but little information is available documenting how organizations have successfully implemented these systems. Objective. To characterize elements of successful electronic health record (EHR) system implementation and to synthesize the key informants' perspectives about successful implementation practices. Methods. Key informant interviews and focus groups were conducted with a purposive sample of individuals from US healthcare organizations identified for their success with ambulatory EHR implementation. Rigorous qualitative data analyses used both deductive and inductive methods. Results. Participants identified personal and system-related barriers, at both the individual and organization levels, including poor computer skills, productivity losses, resistance to change, and EHR system failure. Implementation success was reportedly facilitated by careful planning and consistent communication throughout distinct stages of the implementation process. A significant element of successful implementation was an emphasis on optimization, both during “go-live” and, subsequently, when users had more experience with the system. Conclusion. Successful EHR implementation requires both detailed planning and clear mechanisms to deal with unforeseen or unintended consequences. Focusing on user buy-in early and including plans for optimization can facilitate greater success. PMID:24228257

  18. Iowa in motion : transit system plan : implementing Iowa's state transportation plan

    DOT National Transportation Integrated Search

    1999-09-14

    The Iowa Transit System Plan was developed as a result of the on-going long-range transportation planning process known as Iowa In Motion This planning document, the 1999 Iowa Transit System Plan, is the result of this continuing planning process and...

  19. A Model for Implementing a Career Education System.

    ERIC Educational Resources Information Center

    Ryan, T. Antoinette

    The model for career education implementation defines three major functions which constitute the essential elements in the implementation process: planning, implementation, and evaluation. Emphasis is placed on the interrelatedness of implementation to both planning and evaluation of career education. The 11 subsystems involved in implementing…

  20. Sample-Based Motion Planning in High-Dimensional and Differentially-Constrained Systems

    DTIC Science & Technology

    2010-02-01

    Reachable Set . . . 88 6-1 LittleDog Robot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94 6-2 Dog bounding up stairs ...planning algorithm implemented on LittleDog, a quadruped robot . The motion planning algorithm successfully planned bounding trajectories over extremely...a motion planning algorithm implemented on LittleDog, a quadruped robot . The motion planning algorithm successfully planned bounding trajectories

  1. How healthcare systems evaluate their advance care planning initiatives: Results from a systematic review.

    PubMed

    Biondo, Patricia D; Lee, Lydia D; Davison, Sara N; Simon, Jessica E

    2016-09-01

    Advance care planning initiatives are being implemented across healthcare systems around the world, but how best to evaluate their implementation is unknown. To identify gaps and/or redundancies in current evaluative strategies to help healthcare systems develop future evaluative frameworks for ACP. Systematic review. Peer-reviewed and gray literature searches were conducted till February 2015 to answer: "What methods have healthcare systems used to evaluate implementation of advance care planning initiatives?" A PICOS framework was developed to identify articles describing the implementation and evaluation of a health system-level advance care planning initiative. Outcome measures were mapped onto a conceptual quality indicator framework based on the Institute of Medicine and Donabedian models of healthcare quality. A total of 46 studies met inclusion criteria for analysis. Most articles reported on single parts of a healthcare system (e.g. continuing care). The most common outcome measures pertained to document completion, followed by healthcare resource use. Patient-, family-, or healthcare provider-reported outcomes were less commonly measured. Concordance measures (e.g. dying in place of choice) were reported by only 26% of studies. The conceptual quality indicator framework identified gaps and redundancies in measurement and is presented as a potential foundation from which to develop a comprehensive advance care planning evaluation framework. Document completion is frequently used to evaluate advance care planning program implementation; capturing the quality of care appears to be more difficult. This systematic review provides health system administrators with a comprehensive summary of measures used to evaluate advance care planning and may identify gaps in evaluation within their local context. © The Author(s) 2016.

  2. National Voice Response System (VRS) Implementation Plan Alternatives Study

    DOT National Transportation Integrated Search

    1979-07-01

    This study examines the alternatives available to implement a national Voice Response System (VRS) for automated preflight weather briefings and flight plan filing. Four major hardware configurations are discussed. A computerized analysis model was d...

  3. 75 FR 66319 - State Systems Advance Planning Document (APD) Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...

  4. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  5. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  6. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  7. Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

  8. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    NASA Astrophysics Data System (ADS)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  9. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    NASA Astrophysics Data System (ADS)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  10. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    ERIC Educational Resources Information Center

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  11. Next generation air transportation system : issues associated with midterm implementation of capabilities and full system transformation.

    DOT National Transportation Integrated Search

    2009-03-01

    To prepare for forecasted air traffic : growth, the Federal Aviation : Administration (FAA), including its : Joint Planning and Development : Office (JPDO) and Air Traffic : Organization (ATO), is planning for : and implementing the Next : Generation...

  12. 75 FR 70654 - Approval and Promulgation of Air Quality Implementation Plans; Texas; System Cap Trading Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... Promulgation of Air Quality Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental..., 2001, and August 16, 2007, that create and amend the System Cap Trading (SCT) Program at Title 30 of.... What action is EPA proposing? II. What did Texas submit? III. What is the System Cap Trading Program...

  13. Advanced rural transportation systems (ARTS) : rural intelligent transportation systems (ITS) : program plan

    DOT National Transportation Integrated Search

    1996-08-01

    This Program Plan for the Advanced Rural Transportation Systems (ARTS) implements the goals and objectives established in the U.S. Department of Transportations (USDOTs) Strategic Plan for the ARTS. This Program Plan proposes five years (FY 97...

  14. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  15. Implementation of green infrastructure concept in Citarum Watershed

    NASA Astrophysics Data System (ADS)

    Maryati, Sri; Humaira, An Nisaa'Siti

    2017-03-01

    Green infrastructure has several benefits compared to grey infrastructure in term of environmental services and sustainability, such as reducing energy consumption, improving air quality, providing carbon sequestration, and increasing property values. Nevertheless in practice, the implementation of the concept in Indonesia is still limited. Implementation of the certain concept has to be guided in planning document. In this paper, green infrastructure concept in the current spatial plan and other planning documents is assessed. The purpose of this research is to figure out how far the green infrastructure concept is integrated into planning system, based on the analysis of planning documents in Citarum Watershed and expert interviews with local stakeholders. Content analysis method is used to analyze the documents and result of interview. The result shows that green infrastructure concept has not been accommodated in spatial plan or other planning documents widely. There are some challenges in implementing the concept including reward and punishment system (incentive and disincentive), coordination, and lack of human resources.

  16. 76 FR 19739 - Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0013; FRL-9290-1] Approval and Promulgation of Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental Protection Agency... the System Cap Trading (SCT) Program at Title 30 Texas Administrative Code, Chapter 101--General Air...

  17. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    ERIC Educational Resources Information Center

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  18. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  19. Planning for Obsolescence.

    ERIC Educational Resources Information Center

    Malinconico, S. Michael

    1984-01-01

    Discusses planning for the implementation of a high technology system which includes plans for how it will be phased out and an orderly transition made to its successor. System life expectations, user pressures, software modifications, commercial vendors, integrated systems, eroding economies, and replacement planning are highlighted. (EJS)

  20. 15 CFR 273.6 - Reporting requirement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implementation plans, with a current timetable for the agency's transition to the metric system, as well as actions planned for the budget year involved to implement fully the metric system, in accordance with this... OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES...

  1. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum, complies...

  2. Evaluation of the Healthy Lifestyles Initiative for Improving Community Capacity for Childhood Obesity Prevention.

    PubMed

    Berman, Marcie; Bozsik, Frances; Shook, Robin P; Meissen-Sebelius, Emily; Markenson, Deborah; Summar, Shelly; DeWit, Emily; Carlson, Jordan A

    2018-02-22

    Policy, systems, and environmental approaches are recommended for preventing childhood obesity. The objective of our study was to evaluate the Healthy Lifestyles Initiative, which aimed to strengthen community capacity for policy, systems, and environmental approaches to healthy eating and active living among children and families. The Healthy Lifestyles Initiative was developed through a collaborative process and facilitated by community organizers at a local children's hospital. The initiative supported 218 partners from 170 community organizations through training, action planning, coalition support, one-on-one support, and the dissemination of materials and sharing of resources. Eighty initiative partners completed a brief online survey on implementation strategies engaged in, materials used, and policy, systems, and environmental activities implemented. In accordance with frameworks for implementation science, we assessed associations among the constructs by using linear regression to identify whether and which of the implementation strategies were associated with materials used and implementation of policy, systems, and environmental activities targeted by the initiative. Each implementation strategy was engaged in by 30% to 35% of the 80 survey respondents. The most frequently used materials were educational handouts (76.3%) and posters (66.3%). The most frequently implemented activities were developing or continuing partnerships (57.5%) and reviewing organizational wellness policies (46.3%). Completing an action plan and the number of implementation strategies engaged in were positively associated with implementation of targeted activities (action plan, effect size = 0.82; number of strategies, effect size = 0.51) and materials use (action plan, effect size = 0.59; number of strategies, effect size = 0.52). Materials use was positively associated with implementation of targeted activities (effect size = 0.35). Community-capacity-building efforts can be effective in supporting community organizations to engage in policy, systems, and environmental activities for healthy eating and active living. Multiple implementation strategies are likely needed, particularly strategies that involve a high level of engagement, such as training community organizations and working with them on structured action plans.

  3. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgard, K.G.

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less

  4. 2000 Florida rail system plan

    DOT National Transportation Integrated Search

    2000-01-01

    The purpose of the Florida Rail System Plan is two-fold. First, it represents the rail : component of the Florida Transportation Plan (Agency Functional Plan) which, through an : annual series of policies, programs and projects, implements the Transp...

  5. 78 FR 15757 - Joint Industry Plan; Notice of Filing of the Third Amendment to the National Market System Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ...; Notice of Filing of the Third Amendment to the National Market System Plan to Address Extraordinary... following parties to the National Market System Plan: BATS Exchange, Inc., BATS Y- Exchange, Inc., Chicago... preparing, filing, and implementing national market system plans. I. Definitions (A) ``Eligible Reported...

  6. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    PubMed

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  7. Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran

    PubMed Central

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2015-01-01

    Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385

  8. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  9. Pre-implementation studies of a workforce planning tool for nurse staffing and human resource management in university hospitals.

    PubMed

    van Oostveen, Catharina J; Ubbink, Dirk T; Mens, Marian A; Pompe, Edwin A; Vermeulen, Hester

    2016-03-01

    To investigate the reliability, validity and feasibility of the RAFAELA workforce planning system (including the Oulu patient classification system - OPCq), before deciding on implementation in Dutch hospitals. The complexity of care, budgetary restraints and demand for high-quality patient care have ignited the need for transparent hospital workforce planning. Nurses from 12 wards of two university hospitals were trained to test the reliability of the OPCq by investigating the absolute agreement of nursing care intensity (NCI) measurements among nurses. Validity was tested by assessing whether optimal NCI/nurse ratio, as calculated by a regression analysis in RAFAELA, was realistic. System feasibility was investigated through a questionnaire among all nurses involved. Almost 67 000 NCI measurements were performed between December 2013 and June 2014. Agreement using the OPCq varied between 38% and 91%. For only 1 in 12 wards was the optimal NCI area calculated judged as valid. Although the majority of respondents was positive about the applicability and user-friendliness, RAFAELA was not accepted as useful workforce planning system. Nurses' performance using the RAFAELA system did not warrant its implementation. Hospital managers should first focus on enlarging the readiness of nurses regarding the implementation of a workforce planning system. © 2015 John Wiley & Sons Ltd.

  10. Planning and Implementing Social Service Information Systems: A Guide for Management and Users. Human Services Monograph Series Number 25. Project Share.

    ERIC Educational Resources Information Center

    Cotter, Barbara

    Intended to aid administrators and users of social services in establishing information systems, this comprehensive guide to the design of such systems identifies the elements, effective strategies, and potential pitfalls involved in their planning, implementation, and utilization. Detailed discussions of management strategies for system…

  11. Protecting the Rights of National Origin Language Minority Students during the Implementation of Race Desegregation Plans.

    ERIC Educational Resources Information Center

    Baez, Tony

    Since the early 1970s the courts, the Federal Government, local governments, and school systems have wrestled with the difficulties that arise as race desegregation is implemented in school systems with substantial enrollments of national origin minority (NOM) students. Desegregating school systems generally produce plans to guide racial…

  12. Guide to Developing an Environmental Management System - Plan

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  13. 77 FR 33498 - Joint Industry Plans; Order Approving, on a Pilot Basis, the National Market System Plan To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...

  14. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  15. Iowa in motion : aviation system plan : implementing Iowa's state transportation plan

    DOT National Transportation Integrated Search

    1999-09-14

    Iowa's system of airports provides a variety of services vital to the state's economy and is an integral part of Iowa's overall transportation system. This 1999 Iowa Aviation System Plan (IASP) addresses issues concerning the state's investment in av...

  16. Planning the Implementation of an Integrated On-line Acquisitions System.

    ERIC Educational Resources Information Center

    Baldwin, Paul E.

    1984-01-01

    Discusses need to consider political context of decision-making process and describes how cost data were presented to obtain management approval for implementation planning for integrated online acquisitions and fund accounting system involving Simon Fraser University, University of British Columbia, and University of Victoria. Cost, budget, and…

  17. 48 CFR 1407.102 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...

  18. 48 CFR 1407.102 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...

  19. Framework for Evaluating Educational Systemic Initiatives.

    ERIC Educational Resources Information Center

    Ikegulu, T. Nelson

    This paper describes the implementation of the Holistic Systemic Evaluation (HSE), a component of an Education Systemic Initiative's strategic management. The HSE provides general guidance for the implementation and continual improvement of an Education Systemic Initiative Reform (ESIR). The implementation of the education system initiative plan:…

  20. Implementation of enterprise resource planning systems: a user perspective

    NASA Astrophysics Data System (ADS)

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, S; Guerrero, M; Zhang, B

    Purpose: To implement a comprehensive non-measurement-based verification program for patient-specific IMRT QA Methods: Based on published guidelines, a robust IMRT QA program should assess the following components: 1) accuracy of dose calculation, 2) accuracy of data transfer from the treatment planning system (TPS) to the record-and-verify (RV) system, 3) treatment plan deliverability, and 4) accuracy of plan delivery. Results: We have implemented an IMRT QA program that consist of four components: 1) an independent re-calculation of the dose distribution in the patient anatomy with a commercial secondary dose calculation program: Mobius3D (Mobius Medical Systems, Houston, TX), with dose accuracy evaluationmore » using gamma analysis, PTV mean dose, PTV coverage to 95%, and organ-at-risk mean dose; 2) an automated in-house-developed plan comparison system that compares all relevant plan parameters such as MU, MLC position, beam iso-center position, collimator, gantry, couch, field size settings, and bolus placement, etc. between the plan and the RV system; 3) use of the RV system to check the plan deliverability and further confirm using “mode-up” function on treatment console for plans receiving warning; and 4) implementation of a comprehensive weekly MLC QA, in addition to routine accelerator monthly and daily QA. Among 1200 verifications, there were 9 cases of suspicious calculations, 5 cases of delivery failure, no data transfer errors, and no failure of weekly MLC QA. These 9 suspicious cases were due to the PTV extending to the skin or to heterogeneity correction effects, which would not have been caught using phantom measurement-based QA. The delivery failure was due to the rounding variation of MLC position between the planning system and RV system. Conclusion: A very efficient, yet comprehensive, non-measurement-based patient-specific QA program has been implemented and used clinically for about 18 months with excellent results.« less

  2. A Manual for the Illinois Student Longitudinal Case Study System (ISLCS). Procedures and Materials for Planning and Implementing the ISLCS.

    ERIC Educational Resources Information Center

    Carvell, Fred; Carvell, Joan B.

    Designed for local school and district vocational educators, this manual contains instructions and materials necessary to plan and implement a student longitudinal followup system. Part 1 provides background information and definitions used in the system. In part 2 are described the 11 major activities that must be undertaken by local program…

  3. Critical Success Factors (CSFs) for Implementation of Enterprise Resource Planning (ERP) Systems in Various Industries, Including Institutions of Higher Education (IHEs)

    ERIC Educational Resources Information Center

    Debrosse-Bruno, Marie Michael

    2017-01-01

    Enterprise Resource Planning (ERP) systems present a management problem for various industries including institutions of higher education (IHEs) because they are costly to acquire, challenging to implement, and often fail to meet anticipated expectations. ERP systems are highly complex due to the nature of the operations they support. This…

  4. Identifying Executable Plans

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Jonsson, Ari K.; Frank, Jeremy D.; McGann, Conor

    2003-01-01

    Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the xectieonfvii rnm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.

  5. Intelligent transportation systems business plan for Kentucky : final report.

    DOT National Transportation Integrated Search

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  6. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 6. Development and Transition Plans.

    DOT National Transportation Integrated Search

    1974-02-01

    The volume presents the plans for implementing the Satellite-Based Advanced Air Traffic Management System (SAATMS) described in Volumes II, III, and IV. Two plans are presented: an RDT&E plan and a transition plan. The RDT&E plan is presented as a se...

  7. Current Strategic Business Plan for the Implementation of Digital Systems.

    ERIC Educational Resources Information Center

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  8. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    ERIC Educational Resources Information Center

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  9. QUALITY SYSTEMS AND IMPLEMENTATION PLAN FOR A PILOT STUDY OF CHILDREN'S TOTAL EXPOSURE TO PERSISTENT PESTICIDES AND OTHER PERSISTENT ORGANIC PESTICIDES (CTEPP)

    EPA Science Inventory

    The Quality System Implementation Plan (QSIP) describes the quality assurance and quality control procedures developed for the CTEPP study. It provides the QA/QC procedures used in recruitment of subjects, sample field collection, sample extraction and analysis, data storage, and...

  10. Post-Implementation Success Factors for Enterprise Resource Planning Student Administration Systems in Higher Education Institutions

    ERIC Educational Resources Information Center

    Sullivan, Linda; Bozeman, William

    2010-01-01

    Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…

  11. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  12. Implementing a Systematic Planning Process in Two Very Small Rural Public Libraries.

    ERIC Educational Resources Information Center

    Senkevitch, Judith J.

    1985-01-01

    Describes a pilot project by a regional library system in central New York State to implement systematic planning activities in rural public libraries serving populations under 5,000. Motivations for the adoption of innovation and key elements in the decision making process during implementation are examined. (CLB)

  13. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    NASA Astrophysics Data System (ADS)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the planner unit in realizing the budget that has been designed. It also proves that the value chain of the information planning system has brought implications for budget realization.

  14. The California general plan process and sustainable transportation planning

    DOT National Transportation Integrated Search

    2002-05-01

    This research project assesses California's General Plan process as a tool for implementing sustainable development, with particular emphasis on transportation systems at the local level, including the relationship of local transportation systems to ...

  15. Investigating and Learning Lessons from Early Experiences of Implementing ePrescribing Systems into NHS Hospitals: A Questionnaire Study

    PubMed Central

    Cresswell, Kathrin; Coleman, Jamie; Slee, Ann; Williams, Robin; Sheikh, Aziz

    2013-01-01

    Background ePrescribing systems have significant potential to improve the safety and efficiency of healthcare, but they need to be carefully selected and implemented to maximise benefits. Implementations in English hospitals are in the early stages and there is a lack of standards guiding the procurement, functional specifications, and expected benefits. We sought to provide an updated overview of the current picture in relation to implementation of ePrescribing systems, explore existing strategies, and identify early lessons learned. Methods A descriptive questionnaire-based study, which included closed and free text questions and involved both quantitative and qualitative analysis of the data generated. Results We obtained responses from 85 of 108 NHS staff (78.7% response rate). At least 6% (n = 10) of the 168 English NHS Trusts have already implemented ePrescribing systems, 2% (n = 4) have no plans of implementing, and 34% (n = 55) are planning to implement with intended rapid implementation timelines driven by high expectations surrounding improved safety and efficiency of care. The majority are unclear as to which system to choose, but integration with existing systems and sophisticated decision support functionality are important decisive factors. Participants highlighted the need for increased guidance in relation to implementation strategy, system choice and standards, as well as the need for top-level management support to adequately resource the project. Although some early benefits were reported by hospitals that had already implemented, the hoped for benefits relating to improved efficiency and cost-savings remain elusive due to a lack of system maturity. Conclusions Whilst few have begun implementation, there is considerable interest in ePrescribing systems with ambitious timelines amongst those hospitals that are planning implementations. In order to ensure maximum chances of realising benefits, there is a need for increased guidance in relation to implementation strategy, system choice and standards, as well as increased financial resources to fund local activities. PMID:23335961

  16. International Space Station Payload Operations Integration Center (POIC) Overview

    NASA Technical Reports Server (NTRS)

    Ijames, Gayleen N.

    2012-01-01

    Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).

  17. Evaluation of the Healthy Lifestyles Initiative for Improving Community Capacity for Childhood Obesity Prevention

    PubMed Central

    Berman, Marcie; Bozsik, Frances; Shook, Robin P.; Meissen-Sebelius, Emily; Markenson, Deborah; Summar, Shelly; DeWit, Emily

    2018-01-01

    Purpose and Objectives Policy, systems, and environmental approaches are recommended for preventing childhood obesity. The objective of our study was to evaluate the Healthy Lifestyles Initiative, which aimed to strengthen community capacity for policy, systems, and environmental approaches to healthy eating and active living among children and families. Intervention Approach The Healthy Lifestyles Initiative was developed through a collaborative process and facilitated by community organizers at a local children’s hospital. The initiative supported 218 partners from 170 community organizations through training, action planning, coalition support, one-on-one support, and the dissemination of materials and sharing of resources. Evaluation Methods Eighty initiative partners completed a brief online survey on implementation strategies engaged in, materials used, and policy, systems, and environmental activities implemented. In accordance with frameworks for implementation science, we assessed associations among the constructs by using linear regression to identify whether and which of the implementation strategies were associated with materials used and implementation of policy, systems, and environmental activities targeted by the initiative. Results Each implementation strategy was engaged in by 30% to 35% of the 80 survey respondents. The most frequently used materials were educational handouts (76.3%) and posters (66.3%). The most frequently implemented activities were developing or continuing partnerships (57.5%) and reviewing organizational wellness policies (46.3%). Completing an action plan and the number of implementation strategies engaged in were positively associated with implementation of targeted activities (action plan, effect size = 0.82; number of strategies, effect size = 0.51) and materials use (action plan, effect size = 0.59; number of strategies, effect size = 0.52). Materials use was positively associated with implementation of targeted activities (effect size = 0.35). Implications for Public Health Community-capacity–building efforts can be effective in supporting community organizations to engage in policy, systems, and environmental activities for healthy eating and active living. Multiple implementation strategies are likely needed, particularly strategies that involve a high level of engagement, such as training community organizations and working with them on structured action plans. PMID:29470168

  18. School Planning, Evaluation and Communication System (SPECS).

    ERIC Educational Resources Information Center

    Flocco, Edward C.

    A comprehensive school planning tool is available from General Learning Corporation and the Center for the Advanced Study of Educational Administration at the University of Oregon. This School Planning, Evaluation and Communication System (SPECS) provides a deliverable system of training, implementation strategies and materials and technical…

  19. Using planned adaptation to implement evidence-based programs with new populations.

    PubMed

    Lee, Shawna J; Altschul, Inna; Mowbray, Carol T

    2008-06-01

    The Interactive Systems Framework (ISF) for Dissemination and Implementation (Wandersman et al. 2008) elaborates the functions and structures that move evidence-based programs (EBPs) from research to practice. Inherent in that process is the tension between implementing programs with fidelity and the need to tailor programs to fit the target population. We propose Planned Adaptation as one approach to resolve this tension, with the goal of guiding practitioners in adapting EBPs so that they maintain core components of program theory while taking into account the needs of particular populations. Planned Adaptation is a form of capacity building within the Prevention Support System that provides a framework to guide practitioners in adapting programs while encouraging researchers to provide information relevant to adaptation as a critical aspect of dissemination research, with the goal of promoting wider dissemination and better implementation of EBPs. We illustrate Planned Adaptation using the JOBS Program (Caplan et al. 1989), which was developed for recently laid-off, working- and middle-class workers and subsequently implemented with welfare recipients.

  20. A Study of the Feasibility of Implementing the "CAMPUS" Planning Model.

    ERIC Educational Resources Information Center

    Keene, T. Wayne

    A study was conducted to determine the feasibility of implementing the CAMPUS (Comprehensive Analytical Methods for Planning in University/College Systems) PMS model for planning and resource allocation purposes in the University of South Florida College of Education. A description of CAMPUS PMS was developed, including the nature, output…

  1. Region 4 ATMS local evaluation report

    DOT National Transportation Integrated Search

    2005-07-01

    In March, 1996, the Rochester Areawide Advanced Transportation Management System Report (6) established the need for an ITS as well as a strategic implementation/deployment plan. This plan has, in part, been implemented through the design and constru...

  2. Comparing Public and Private Institutions That Have and Have Not Implemented Enterprise Resource Planning (ERP) Systems: A Resource Dependence Perspective

    ERIC Educational Resources Information Center

    Sendhil, Geetha R.

    2012-01-01

    The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…

  3. Effectiveness of a Case-Based System in Lesson Planning

    ERIC Educational Resources Information Center

    Saad, A.; Chung, P. W. H.; Dawson, C. W.

    2014-01-01

    Lesson planning imposes a significant burden on teachers as they need to prepare different lesson plans for different classes according to various constraints. SmartLP, a case-based lesson planning system, has been implemented as a means of assisting teachers in constructing quality lesson plans more quickly. SmartLP enables teachers to retrieve…

  4. Evaluation of effectiveness of information systems implementation in organization (by example of ERP-systems)

    NASA Astrophysics Data System (ADS)

    Demyanova, O. V.; Andreeva, E. V.; Sibgatullina, D. R.; Kireeva-Karimova, A. M.; Gafurova, A. Y.; Zakirova, Ch S.

    2018-05-01

    ERP in a modern enterprise information system allowed optimizing internal business processes, reducing production costs and increasing the attractiveness of enterprises for investors. It is an important component of success in the competition and an important condition for attracting investments in the key sector of the state. A vivid example of these systems are enterprise information systems using the methodology of ERP (Enterprise Resource Planning - enterprise resource planning). ERP is an integrated set of methods, processes, technologies and tools. It is based on: supply chain management; advanced planning and scheduling; sales automation; tool responsible for configuring; final resource planning; intelligence business; OLAP technology; block e- Commerce; management of product data. The main purpose of ERP systems is the automation of interrelated processes of planning, accounting and management in key areas of the company. ERP systems are automated systems that effectively address complex problems, including optimal allocation of business resources, ensuring quick and efficient delivery of goods and services to the consumer. Knowledge embedded in ERP systems provided enterprise-wide automation to introduce the activities of all functional departments of the company as a single complex system. At the level of quality estimates, most managers understand that the implementations of ERP systems is a necessary and useful procedure. Assessment of the effectiveness of the information systems implementation is relevant.

  5. Case Management: Let Us Count the Ways.

    ERIC Educational Resources Information Center

    Austin, Carol D.

    Case management as implemented in programs for the elderly, has focused on interactions between the client and case manager in the areas of assessment, care planning, service plan implementation, and follow-up. Variation in these case management tasks suggests that no single model can be implemented in all local delivery systems. This emphasis on…

  6. Orange County intelligent vehicle/highway systems study : IVHS action plan

    DOT National Transportation Integrated Search

    1997-01-21

    This report is a result of the efforts undertaken for Task 6 of the Orange County : Intelligent Vehicle-Highway Systems (IVHS) Study, the development of an Action Plan for : implementation of the Orange County IVHS Master Plan.

  7. Cost-Benefit Analysis of the Officer Career Information and Planning System

    DTIC Science & Technology

    1980-08-01

    information without the use of a computer. - vii COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFOýKATTON AND PLANNING SYSTEM CONTENTS Page INTRODUCTION ...OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM INTRODUCTION The implementation of the Officer Personnel Management System (OPMS) has...Research Report 1256 I / COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM Roger A. Myers, Peter C. Cairo, K - Jon A

  8. Top Down Implementation Plan for system performance test software

    NASA Technical Reports Server (NTRS)

    Jacobson, G. N.; Spinak, A.

    1982-01-01

    The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

  9. Management Information System Based on the Balanced Scorecard

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  10. Barriers to Implementing Person-Centered Recovery Planning in Public Mental Health Organizations in Texas: Results from Nine Focus Groups.

    PubMed

    Lodge, Amy C; Kaufman, Laura; Stevens Manser, Stacey

    2017-05-01

    Despite being an established practice in the disabilities service systems, person-centered planning is a relatively new practice in the behavioral health system. As a result, little is known about the barriers that mental health organizations face in implementing person-centered recovery planning (PCRP). To fill this gap, results are presented from a qualitative analysis of nine focus groups at three public mental health organizations in Texas that have been implementing PCRP for at least 2 years. Findings suggest that organizations experienced 12 distinct barriers to PCRP implementation which were categorized into the Consolidated Framework for Implementation Research domains of intervention characteristics, the outer setting, the inner setting, characteristics of individuals, and the implementation process. Half of these 12 barriers fell within the inner setting domain, suggesting that implementation efforts should be flexible and adaptable to organizational culture and context. One-quarter of the barriers fell into the domain of characteristics of individuals involved in the intervention, which further suggests implementation efforts should assess the impact that both staff and consumers have on implementation success.

  11. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

  12. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  13. ERP System Implementation: An Oil and Gas Exploration Sector Perspective

    NASA Astrophysics Data System (ADS)

    Mishra, Alok; Mishra, Deepti

    Enterprise Resource Planning (ERP) systems provide integration and optimization of various business processes which leads to improved planning and decision quality, smoother coordination between business units resulting in higher efficiency, and quicker response time to customer demands and inquiries. This paper reports challenges, opportunities and outcome of ERP implementation in Oil & Gas exploration sector. This study will facilitate in understanding transition, constraints and implementation of ERP in this sector and also provide guidelines from lessons learned in this regard.

  14. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  15. Emerging and Disruptive Technologies for Education: An Analysis of Planning, Implementation, and Diffusion in Florida's Eleven State University System Institutions

    ERIC Educational Resources Information Center

    Bradford, Deborah J.

    2010-01-01

    The purpose of the study was to understand and appreciate the methodologies and procedures used in determining the extent to which an information technology (IT) organization within the eleven member State University Systems (SUS) of Florida planned, implemented, and diffused emerging educational technologies. Key findings found how critical it…

  16. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (QSIP) FOR TOTAL HUMAN EXPOSURE IN ARIZONA: A COMPARISON OF THE BORDER COMMUNITIES AND THE STATE

    EPA Science Inventory

    Prior to initiation of the Arizona Border Survey, a quality systems implementation plan (QSIP) addressing all aspects of the project was developed by the investigating consortium composed of researchers from The University of Arizona (UA), Battelle Memorial Institute (BMI), and t...

  17. Implementation guidelines for road weather information systems

    DOT National Transportation Integrated Search

    1997-11-01

    The report presents guidelines for implementing road weather information systems (RWIS). These guidelines will assist highway agency personnel with the planning, installation, and maintenance of road weather information systems for either ice or high...

  18. Implementation Never Ends! The Postimplementation Organizational and Operational Implications of ERP

    ERIC Educational Resources Information Center

    Goldstein, Philip J.

    2006-01-01

    Planning for the ongoing support and maintenance that accompany implementation of new enterprise resource planning systems may be more essential to realizing benefit from a technology investment than choosing the product with the most features. (Contains 1 table.)

  19. Strategic Enterprise Architecture Design and Implementation Plan for the Montana Department of Transportation

    DOT National Transportation Integrated Search

    2016-08-01

    The purpose of this research report is to develop a Strategic Enterprise Architecture (EA) Design and Implementation Plan for the Montana Department of Transportation (MDT). Information management systems are vital to maintaining the States transp...

  20. Clean Water Act (CWA) Action Plan Implementation Priorities: Changes to Improve Water Quality, Increase Compliance and Expand Transparency

    EPA Pesticide Factsheets

    The Clean Water Act (CWA) Action Plan Implementation Priorities describes the new approaches to revamp the National Pollutant Discharge Elimination System (NPDES) permitting, compliance and enforcement program.Issued May 11, 2011

  1. Key practices for implementing geospatial technologies for a planning and environment linkages (PEL) approach

    DOT National Transportation Integrated Search

    2008-07-01

    This report presents three case studies that illustrate how geographic information systems (GIS) have been used to implement the Federal Highway Administrations (FHWA) Planning and Environment Linkages (PEL) approach. The PEL approach provides inf...

  2. Challenges experienced by nurses in the implementation of a healthcare reform plan in Iran.

    PubMed

    Salarvand, Shahin; Azizimalekabadi, Maryam; Jebeli, Azadeh Akbari; Nazer, Mohamadreza

    2017-04-01

    The Healthcare Reform Plan is counted as a plan for improving healthcare services in Iran. Undoubtedly pros and cons can be seen either in plan or implementation. This study was conducted to describe nurses' challenges in implementing healthcare reform in Iran. A qualitative method centered upon conventional content analysis was applied. We used purposive sampling and data saturation was obtained by 30 participants. Data were analyzed using MAXQDA software. Challenges experienced by nurses in the implementation of this reform include; unsuitable infrastructure, unfavorable vision, a complicated challenge, the necessity of monitoring, control plan outcomes, the impact on nurses, people's misconceptions and solutions. The Healthcare Reform Plan in Iran is a solution to establish equality in the health system, however, to eliminate these challenges, revision and appropriate foundation of infrastructures is called for.

  3. Underground storage tank management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less

  4. 77 FR 50985 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... National Forest System Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land... implementation of the National Forest System Land Management Rule. The meeting is open to the public. The purpose...

  5. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    NASA Technical Reports Server (NTRS)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  6. Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition

    NASA Astrophysics Data System (ADS)

    Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly

    2018-04-01

    Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.

  7. Nascom System Development Plan: System Description, Capabilities and Plans

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

  8. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    NASA Technical Reports Server (NTRS)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  9. Program planning for the community teaching hospital medical library.

    PubMed Central

    McCorkel, J; Cook, V

    1985-01-01

    To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443

  10. Verification of intensity modulated radiation therapy beams using a tissue equivalent plastic scintillator dosimetry system

    NASA Astrophysics Data System (ADS)

    Petric, Martin Peter

    This thesis describes the development and implementation of a novel method for the dosimetric verification of intensity modulated radiation therapy (IMRT) fields with several advantages over current techniques. Through the use of a tissue equivalent plastic scintillator sheet viewed by a charge-coupled device (CCD) camera, this method provides a truly tissue equivalent dosimetry system capable of efficiently and accurately performing field-by-field verification of IMRT plans. This work was motivated by an initial study comparing two IMRT treatment planning systems. The clinical functionality of BrainLAB's BrainSCAN and Varian's Helios IMRT treatment planning systems were compared in terms of implementation and commissioning, dose optimization, and plan assessment. Implementation and commissioning revealed differences in the beam data required to characterize the beam prior to use with the BrainSCAN system requiring higher resolution data compared to Helios. This difference was found to impact on the ability of the systems to accurately calculate dose for highly modulated fields, with BrainSCAN being more successful than Helios. The dose optimization and plan assessment comparisons revealed that while both systems use considerably different optimization algorithms and user-control interfaces, they are both capable of producing substantially equivalent dose plans. The extensive use of dosimetric verification techniques in the IMRT treatment planning comparison study motivated the development and implementation of a novel IMRT dosimetric verification system. The system consists of a water-filled phantom with a tissue equivalent plastic scintillator sheet built into the top surface. Scintillation light is reflected by a plastic mirror within the phantom towards a viewing window where it is captured using a CCD camera. Optical photon spread is removed using a micro-louvre optical collimator and by deconvolving a glare kernel from the raw images. Characterization of this new dosimetric verification system indicates excellent dose response and spatial linearity, high spatial resolution, and good signal uniformity and reproducibility. Dosimetric results from square fields, dynamic wedged fields, and a 7-field head and neck IMRT treatment plan indicate good agreement with film dosimetry distributions. Efficiency analysis of the system reveals a 50% reduction in time requirements for field-by-field verification of a 7-field IMRT treatment plan compared to film dosimetry.

  11. 76 FR 81911 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... National Forest System Land Management Planning Rule AGENCY: USDA Forest Service. ACTION: Notice of intent... intends to establish the National Advisory Committee for Implementation of the National Forest System Land... (FACA), the Committee is being established to provide advice and recommendations on the implementation...

  12. 78 FR 34034 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... National Forest System Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land... purpose of the Committee is to provide advice and recommendations on the implementation of the National...

  13. Next generation air transportation system : status of transformation and issues associated with midterm implementation of capabilities.

    DOT National Transportation Integrated Search

    2009-03-01

    "To prepare for forecasted air traffic growth, the Federal Aviation Administration (FAA), including its Joint Planning and Development Office (JPDO) and Air Traffic Organization (ATO), is planning for and implementing the Next Generation Air Transpor...

  14. User Perceptions of the Implementation of an Electronic Medication Management System in a Paediatric Setting.

    PubMed

    Hardie, Rae-Anne; Baysari, Melissa T; Lake, Rebecca; Richardson, Lauren; McCullagh, Cheryl; Westbrook, Johanna I

    2017-01-01

    The roll-out of a hospital-wide electronic medication management system (eMMS) is a challenging task, requiring planning, coordination, communication and change management. This research aimed to explore the views of doctors and nurses about the strategy used to implement an eMM system in a paediatric hospital. Semi-structured interviews were performed during the first week of the implementation on each ward, and were then followed up three and six weeks post implementation. In total, 90 users (60 nurses and 30 doctors) were asked about their impressions of the implementation, as well as their perceptions of training and IT support. Qualitative thematic analysis was performed by three researchers. Most users perceived the implementation of the eMM to be positive overall. Although perceptions of the implementation process remained largely consistent across the six weeks, users identified several areas where improvements were needed, especially early in implementation, including resources, planning, roll-out strategy and training. These findings are useful for future implementations of eMM systems in paediatric hospitals.

  15. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...

  16. Adopting best practices: "Agility" moves from software development to healthcare project management.

    PubMed

    Kitzmiller, Rebecca; Hunt, Eleanor; Sproat, Sara Breckenridge

    2006-01-01

    It is time for a change in mindset in how nurses operationalize system implementations and manage projects. Computers and systems have evolved over time from unwieldy mysterious machines of the past to ubiquitous computer use in every aspect of daily lives and work sites. Yet, disconcertingly, the process used to implement these systems has not evolved. Technology implementation does not need to be a struggle. It is time to adapt traditional plan-driven implementation methods to incorporate agile techniques. Agility is a concept borrowed from software development and is presented here because it encourages flexibility, adaptation, and continuous learning as part of the implementation process. Agility values communication and harnesses change to an advantage, which facilitates the natural evolution of an adaptable implementation process. Specific examples of agility in an implementation are described, and plan-driven implementation stages are adapted to incorporate relevant agile techniques. This comparison demonstrates how an agile approach enhances traditional implementation techniques to meet the demands of today's complex healthcare environments.

  17. Implementing Information Assurance - Beyond Process

    DTIC Science & Technology

    2009-01-01

    disabled or properly configured. Tools and scripts are available to expedite the configuration process on some platforms, For example, approved Windows...in the System Security Plan (SSP) or Information Security Plan (lSP). Any PPSs not required for operation by the system must be disabled , This...Services must be disabled , Implementing an 1M capability within the boundary carries many policy and documentation requirements. Usemame and passwords

  18. Case report of a near medical event in stereotactic radiotherapy due to improper units of measure from a treatment planning system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gladstone, D. J.; Li, S.; Jarvis, L. A.

    2011-07-15

    Purpose: The authors hereby notify the Radiation Oncology community of a potentially lethal error due to improper implementation of linear units of measure in a treatment planning system. The authors report an incident in which a patient was nearly mistreated during a stereotactic radiotherapy procedure due to inappropriate reporting of stereotactic coordinates by the radiation therapy treatment planning system in units of centimeter rather than in millimeter. The authors suggest a method to detect such errors during treatment planning so they are caught and corrected prior to the patient positioning for treatment on the treatment machine. Methods: Using pretreatment imaging,more » the authors found that stereotactic coordinates are reported with improper linear units by a treatment planning system. The authors have implemented a redundant, independent method of stereotactic coordinate calculation. Results: Implementation of a double check of stereotactic coordinates via redundant, independent calculation is simple and accurate. Use of this technique will avoid any future error in stereotactic treatment coordinates due to improper linear units, transcription, or other similar errors. Conclusions: The authors recommend an independent double check of stereotactic treatment coordinates during the treatment planning process in order to avoid potential mistreatment of patients.« less

  19. Using a Staff Needs Planning System To Increase Organization, To Increase Quality of Client Services, and To Reduce Overtime.

    ERIC Educational Resources Information Center

    Stang, David

    A staff-needs planning system was developed and tested in a Department of Social Services' Family and Children's Services Unit in a medium-sized county where caseworkers used no established strategy or planning method to facilitate accomplishment of all the job requirements. The goal of the study was to implement a planning system based on each…

  20. Automating Space Station operations planning

    NASA Technical Reports Server (NTRS)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  1. Experiencing limits of acceptable change: some thoughts after a decade of implementation

    Treesearch

    Stephen F. McCool; David N. Cole

    1997-01-01

    Wilderness managers and researchers have experienced implementation of the Limits of Acceptable Change planning system for over a decade. In a sense, implementation of LAC has been a broad scale experiment in planning, with the hypothesis being that LAC processes are more effective approaches to deal with questions of recreation management in protected areas than the...

  2. System-Level Influences on the Sustainability of a Cognitive Therapy Program in a Community Behavioral Health Network.

    PubMed

    Stirman, Shannon Wiltsey; Matza, Alexis; Gamarra, Jennifer; Toder, Katherine; Xhezo, Regina; Evans, Arthur C; Hurford, Matthew; Beck, Aaron T; Crits-Christoph, Paul; Creed, Torrey

    2015-07-01

    The purpose of this study was to examine influences on the sustainability of a program to implement an evidence-based psychotherapy in a mental health system. Interviews with program administrators, training consultants, agency administrators, and supervisors (N=24), along with summaries of program evaluation data and program documentation, were analyzed with a directed content-analytic approach. Findings suggested a number of interconnected and interacting influences on sustainability, including alignment with emerging sociopolitical influences and system and organizational priorities; program-level adaptation and evolution; intervention flexibility; strong communication, collaboration, planning, and support; and perceived benefit. These individual factors appeared to mutually influence one another and contribute to the degree of program sustainability achieved at the system level. Although most influences were positive, financial planning and support emerged as potentially both facilitator and barrier, and evaluation of benefits at the patient level remained a challenge. Several factors appeared to contribute to the sustainability of a psychosocial intervention in a large urban mental health system and warrant further investigation. Understanding interconnections between multiple individual facilitators and barriers appears critical to advancing understanding of sustainability in dynamic systems and adds to emerging recommendations for other implementation efforts. In particular, implications of the findings include the importance of implementation strategies, such as long-term planning, coalition building, clarifying roles and expectations, planned adaptation, evaluation, diversification of financing strategies, and incentivizing implementation.

  3. Project USHER (Uniting Science and Humanness for Educational Redesign): A Proposal for Implementing a Humanistic Management System in Community Colleges.

    ERIC Educational Resources Information Center

    League for Innovation in the Community Coll., Los Angeles, CA.

    Project USHER is designed to help community colleges implement a humanistic management system. This objective is to be achieved by giving each participating college the capability to redesign its own educational system through implementing a planning, programming, budgeting, and evaluation system (PPBE) within the context of participative…

  4. Supporting local planning and budgeting for maternal, neonatal and child health in the Philippines

    PubMed Central

    2013-01-01

    Background Responsibility for planning and delivery of health services in the Philippines is devolved to the local government level. Given the recognised need to strengthen capacity for local planning and budgeting, we implemented Investment Cases (IC) for Maternal, Neonatal and Child Health (MNCH) in three selected sub-national units: two poor, rural provinces and one highly-urbanised city. The IC combines structured problem-solving by local policymakers and planners to identify key health system constraints and strategies to scale-up critical MNCH interventions with a decision-support model to estimate the cost and impact of different scaling-up scenarios. Methods We outline how the initiative was implemented, the aspects that worked well, and the key limitations identified in the sub-national application of this approach. Results Local officials found the structured analysis of health system constraints helpful to identify problems and select locally appropriate strategies. In particular the process was an improvement on standard approaches that focused only on supply-side issues. However, the lack of data available at the local level is a major impediment to planning. While the majority of the strategies recommended by the IC were incorporated into the 2011 plans and budgets in the three study sites, one key strategy in the participating city was subsequently reversed in 2012. Higher level systemic issues are likely to have influenced use of evidence in plans and budgets and implementation of strategies. Conclusions Efforts should be made to improve locally-representative data through routine information systems for planning and monitoring purposes. Even with sound plans and budgets, evidence is only one factor influencing investments in health. Political considerations at a local level and issues related to decentralisation, influence prioritisation and implementation of plans. In addition to the strengthening of capacity at local level, a parallel process at a higher level of government to relieve fund channelling and coordination issues is critical for any evidence-based planning approach to have a significant impact on health service delivery. PMID:23343218

  5. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  6. Challenges experienced by nurses in the implementation of a healthcare reform plan in Iran

    PubMed Central

    Salarvand, Shahin; Azizimalekabadi, Maryam; Jebeli, Azadeh Akbari; Nazer, Mohamadreza

    2017-01-01

    Introduction The Healthcare Reform Plan is counted as a plan for improving healthcare services in Iran. Undoubtedly pros and cons can be seen either in plan or implementation. This study was conducted to describe nurses’ challenges in implementing healthcare reform in Iran. Methods A qualitative method centered upon conventional content analysis was applied. We used purposive sampling and data saturation was obtained by 30 participants. Data were analyzed using MAXQDA software. Results Challenges experienced by nurses in the implementation of this reform include; unsuitable infrastructure, unfavorable vision, a complicated challenge, the necessity of monitoring, control plan outcomes, the impact on nurses, people’s misconceptions and solutions. Conclusions The Healthcare Reform Plan in Iran is a solution to establish equality in the health system, however, to eliminate these challenges, revision and appropriate foundation of infrastructures is called for. PMID:28607646

  7. Implementation of an Automated System.

    ERIC Educational Resources Information Center

    Epstein, Susan Baerg

    1983-01-01

    Discussion of care and planning given to the implementation of an automated library system highlights informing the staff in the early stages, project management, involvement of the entire staff, the control log, time and money, where and when to go online, and implementation consultants. (EJS)

  8. Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCDANIEL, K.S.

    1999-08-31

    Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.

  9. Developing an information systems strategy for nursing.

    PubMed

    Callanan, K M; Hughes, S J

    1995-01-01

    With the rapidly changing health care environment and information technology advances, organizations need to engage in strategic, planned change in order to allocate limited resources, achieve the organization's goals, and fulfill its mission [1]. One of the most important aspects of the organization's planned strategies for change concerns the information systems. The involvement of the nursing department in this process is critical. This poster presentation will communicate how nurses can develop an information systems strategic plan that will enable them to play an active role as contributors and vital participants in the strategic and business planning processes for information systems. This information systems strategy for nursing will: a) provide direction and purpose, b) guide nursing in identifying the kinds of information technology needed, c) assist in timely implementation of a system that supports nursing, and d) identify desired outcomes and benefits of an information system. The nursing information systems plan must be built on, and support, the organization's mission and business plan and integrate into the over-all information systems plans [2]. Components of the nursing strategic plan include the nursing mission statement and vision, an assessment of the current environment to identify supporting technology needed to achieve the nursing vision, expectations/anticipated outcomes, environmental considerations, and special staffing/expertise considerations. The nursing vision and mission statement is an articulation of the overall direction and purpose of the nursing organization. An assessment of the nursing organization, problem areas, opportunities for growth, the physical environment, existing systems, communications requirements, and resources is carried out to help identify areas where new technologies and automated methods of managing information could be applied. Special staffing and expertise not currently available in the organization, but necessary to the successful implementation of the plan, should be identified, and plans for filling those needs should be included in the planning and prioritization process. Based on the mission and assessment findings, goals or anticipated outcomes are developed. These goals must be realistic, financially feasible, and logistically achievable; they should also provide direction for action and decision-making [3]. Measurable objectives and detailed action plans can then be developed from these goals when implementation of this aspect of the strategic plan is begun. It is especially important, even at a strategic planning level, to consider change management techniques, including specific steps to involve individuals who will be affected by the change and to ensure open communication throughout the process. Efforts to collaborate with all affected departments and to offer input and educational opportunities to the various members of the health care team should be included in the strategic plan. A business plan describing the mission, goals, and objectives for a specific system implementation is the final step in the strategic planning process. The business plan includes expected outcomes and cost justification and may be done in cooperation with other departments (in the organization) that will be involved with this system. The business plan is used to communicate the information system's needs to the administration and governing board of the organization. With a good information systems strategy, nursing will be prepared to make more timely and better informed decisions related to applying information technology within the nursing department. The end results of this planning should be evident in the improved utilization of information technology to support the nursing vision and mission.

  10. Systems Analysis of Rapid Transit Underground Construction : Volume 1. Sections 1-5.

    DOT National Transportation Integrated Search

    1974-12-01

    This study describes rapid transit system implementation, design, and construction procedures. The relationships and responsibilities of governmental, private, and public groups involved in planning and implementing an urban rapid transit system are ...

  11. Cape Cod National Seashore intelligent transportation systems implementation plan: final report

    DOT National Transportation Integrated Search

    2011-03-18

    The Volpe National Transportation Systems Center (Volpe Center) is providing technical support to the Cape Cod National Seashore in the planning of an Intelligent Transportation System (ITS). In collaboration with the Cape Cod Commission, National Se...

  12. Louisiana Airport System Plan : measures of performance.

    DOT National Transportation Integrated Search

    1992-07-01

    This report applies measures of performance to gauge the extent to which the airport system achieves its goals and objectives by the implementation of the Airport System Plan. Measures of Performance are expressed as percentages of the given demograp...

  13. Safe Surgery for All: Early Lessons from Implementing a National Government-Driven Surgical Plan in Ethiopia.

    PubMed

    Burssa, Daniel; Teshome, Atlibachew; Iverson, Katherine; Ahearn, Olivia; Ashengo, Tigistu; Barash, David; Barringer, Erin; Citron, Isabelle; Garringer, Kaya; McKitrick, Victoria; Meara, John; Mengistu, Abraham; Mukhopadhyay, Swagoto; Reynolds, Cheri; Shrime, Mark; Varghese, Asha; Esseye, Samson; Bekele, Abebe

    2017-12-01

    Recognizing the unmet need for surgical care in Ethiopia, the Federal Ministry of Health (FMOH) has pioneered innovative methodologies for surgical system development with Saving Lives through Safe Surgery (SaLTS). SaLTS is a national flagship initiative designed to improve access to safe, essential and emergency surgical and anaesthesia care across all levels of the healthcare system. Sustained commitment from the FMOH and their recruitment of implementing partners has led to notable accomplishments across the breadth of the surgical system, including but not limited to: (1) Leadership, management and governance-a nationally scaled surgical leadership and mentorship programme, (2) Infrastructure-operating room construction and oxygen delivery plan, (3) Supplies and logistics-a national essential surgical procedure and equipment list, (4) Human resource development-a Surgical Workforce Expansion Plan and Anaesthesia National Roadmap, (5) Advocacy and partnership-strong FMOH partnership with international organizations, including GE Foundation's SafeSurgery2020 initiative, (6) Innovation-facility-driven identification of problems and solutions, (7) Quality of surgical and anaesthesia care service delivery-a national peri-operative guideline and WHO Surgical Safety Checklist implementation, and (8) Monitoring and evaluation-a comprehensive plan for short-term and long-term assessment of surgical quality and capacity. As Ethiopia progresses with its commitment to prioritize surgery within its Health Sector Transformation Plan, disseminating the process and outcomes of the SaLTS initiative will inform other countries on successful national implementation strategies. The following article describes the process by which the Ethiopian FMOH established surgical system reform and the preliminary results of implementation across these eight pillars.

  14. Iran's Health Reform Plan: Measuring Changes in Equity Indices.

    PubMed

    Assari Arani, Abbas; Atashbar, Tohid; Antoun, Joseph; Bossert, Thomas

    2018-03-01

    Two years after the implementation of the Health Sector Evolution Plan (HSEP), this study evaluated the effects of the plan on health equity indices. The main indices assessed by the study were the Out-of-Pocket (OOP) health expenditures, the Fairness in Financial Contribution (FFC) to the health system index, the index of households' Catastrophic Health Expenditure (CHE) and the headcount ratio of Impoverishing Health Expenditure (IHE). The per capita share of costs for total health services has been decreased. The lowered costs have been more felt in rural areas, generally due to sharp decrease in inpatient costs. Per capita pay for outpatient services is almost constant or has slightly increased. The reform plan has managed to improve households' Catastrophic Health Expenditure (CHE) index from an average of 2.9% before the implementation of the plan to 2.3% after the plan. The Fairness in Financial Contribution (FFC) to the health system index has worsened from 0.79 to 0.76, and the headcount ratio of Impoverishing Health Expenditure (IHE) index deteriorated after the implementation of plan from 0.34 to 0.50. Considerable improvement, in decreasing the burden of catastrophic hospital costs in low income strata which is about 26% relative to the time before the implementation of the plan can be regarded as the main achievement of the plan, whereas the worsening in the headcount ratio of IHE and FFC are the equity bottlenecks of the plan.

  15. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  16. 48 CFR 611.002-70 - Metric system implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Metric system... COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 611.002-70 Metric system implementation. (a... to metric policy to adopt the metric system as the preferred system of weights and measurements for...

  17. 48 CFR 611.002-70 - Metric system implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Metric system... COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 611.002-70 Metric system implementation. (a... to metric policy to adopt the metric system as the preferred system of weights and measurements for...

  18. 48 CFR 611.002-70 - Metric system implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Metric system... COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 611.002-70 Metric system implementation. (a... to metric policy to adopt the metric system as the preferred system of weights and measurements for...

  19. 48 CFR 611.002-70 - Metric system implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Metric system... COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 611.002-70 Metric system implementation. (a... to metric policy to adopt the metric system as the preferred system of weights and measurements for...

  20. University ERP Implementation in Germany: Qualitative Exploratory Case Study of Administrative Staff Experiences

    ERIC Educational Resources Information Center

    Thelen, Anja

    2015-01-01

    Enterprise Resource Planning (ERP) implementations are expensive, time-consuming, and often do not lead to the expected outcome of integrated IT systems. Many German universities are implementing ERP systems as Campus Management Systems (CMS) and a solution to any problem, need, or requirement the organization has. This exploratory case study…

  1. Critical role of developing national strategic plans as a guide to strengthen laboratory health systems in resource-poor settings.

    PubMed

    Nkengasong, John N; Mesele, Tsehaynesh; Orloff, Sherry; Kebede, Yenew; Fonjungo, Peter N; Timperi, Ralph; Birx, Deborah

    2009-06-01

    Medical laboratory services are an essential, yet often neglected, component of health systems in developing countries. Their central role in public health, disease control and surveillance, and patient management is often poorly recognized by governments and donors. However, medical laboratory services in developing countries can be strengthened by leveraging funding from other sources of HIV/AIDS prevention, care, surveillance, and treatment programs. Strengthening these services will require coordinated efforts by national governments and partners and can be achieved by establishing and implementing national laboratory strategic plans and policies that integrate laboratory systems to combat major infectious diseases. These plans should take into account policy, legal, and regulatory frameworks; the administrative and technical management structure of the laboratories; human resources and retention strategies; laboratory quality management systems; monitoring and evaluation systems; procurement and maintenance of equipment; and laboratory infrastructure enhancement. Several countries have developed or are in the process of developing their laboratory plans, and others, such as Ethiopia, have implemented and evaluated their plan.

  2. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  3. Systems of care as asset-building communities: implementing strengths-based planning and positive youth development.

    PubMed

    McCammon, Susan L

    2012-06-01

    Using a strength-based approach is one of the hallmarks of the system of care (SOC) initiative, and is consistent with the foundations of community psychology. However, while strengths-based planning is recommended and child and family teams often list child and family strengths, the care plans often do not incorporate the strengths in strategies and interventions. The research base regarding strength implementation and effectiveness is summarized, and needed research is outlined. Steps are offered for promoting the use of strengths in SOCS. Implementing programs from the field of positive youth development is advocated as a way that the educational and criminal justice systems could be more actively engaged in implementing strength-based strategies in SOCs. Promoting SOCs to focus more attentively to asset-building (at the child, family, and community level) is compatible with a public health model that addresses mental health concerns in the context of a full range of supports and services so that all children might experience good mental health and realize their potential.

  4. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  5. Planning for Bike Share Connectivity to Rail Transit

    PubMed Central

    Griffin, Greg Phillip; Sener, Ipek Nese

    2016-01-01

    Bike sharing can play a role in providing access to transit stations and then to final destinations, but early implementation of these systems in North America has been opportunistic rather than strategic. This study evaluates local intermodal plan goals using trip data and associated infrastructure such as transit stops and bike share station locations in Austin, Texas, and Chicago, Illinois. Bike sharing use data from both cities suggest a weak relationship with existing rail stations that could be strengthened through collaborative, intermodal planning. The study suggests a planning framework and example language that could be tailored to help address the linkage between bike sharing and transit. Rather than an exhaustive study of the practice, this study provides evidence from these two cities that identify opportunities to improve intermodal planning. Cities that are planning or expanding a bike sharing system should consider carefully how to leverage this mode with existing modes of transport. Regardless of a city’s status in implementing a bike sharing system, planners can leverage information on existing transport systems for planning at regional and local levels. PMID:27872554

  6. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  7. Plan for the Characterization of HIRF Effects on a Fault-Tolerant Computer Communication System

    NASA Technical Reports Server (NTRS)

    Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Miner, Paul S.; Koppen, Sandra V.

    2008-01-01

    This report presents the plan for the characterization of the effects of high intensity radiated fields on a prototype implementation of a fault-tolerant data communication system. Various configurations of the communication system will be tested. The prototype system is implemented using off-the-shelf devices. The system will be tested in a closed-loop configuration with extensive real-time monitoring. This test is intended to generate data suitable for the design of avionics health management systems, as well as redundancy management mechanisms and policies for robust distributed processing architectures.

  8. Paratransit Handbook : a Guide to Paratransit System Implementation volume II - parts 4 and 5

    DOT National Transportation Integrated Search

    1979-02-01

    This Paratransit Handbook has been developed to aid public officials, planners and system operators in planning, designing, implementing, operating and evaluating integrated paratransit systems. The Handbook represents a compedium of techniques and e...

  9. Network access to PCDS (SPAN, ESN, SESNET, ARPANET)

    NASA Technical Reports Server (NTRS)

    Green, J.

    1986-01-01

    One of the major goals of the National Space Science Data Center is to increase access to NASA data systems by enhancing networking activities. The activities are centered around three basic networking systems: the Space Physics Analysis Network (SPAN); the Earth Science Network (ESN); and the NASA Packet Switched System (NPSS). Each system is described, linkages among systems are explained, and future plans are announced. The inclusion of several new climate nodes on SPAN or ESN are also mentioned. Presently, the Pilot Climate Data System is accessible through SPAN and will be accessible through NPSS by summer and ESN by the end of 1986. Ambitious plans for implementation are underway. The implementation of these plans will represent a major advance in the utilization and accessibility of data worldwide.

  10. The Challenge of Implementing an ERP System in a Small and Medium Enterprise--A Teaching Case of ERP Project Management

    ERIC Educational Resources Information Center

    Xu, Hongjiang; Rondeau, Patrick J.; Mahenthiran, Sakthi

    2011-01-01

    Enterprise Resource Planning (ERP) system implementation projects are notoriously risky. While large-scale ERP cases continue to be developed, relatively few new ERP cases have been published that further ERP implementation education in small to medium size firms. This case details the implementation of a new ERP system in a medium sized…

  11. Dallas Freeway/HOV system planning study: Year 2015. A summary of recommended hov improvements. Interim research report, September 1992-August 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walters, C.H.; Lomax, T.J.; Poe, C.M.

    1995-07-01

    The Dallas Freeway/High-Occupany Vehicle Lane System Planning Study is a joint project in cooperation with the Texas Department of Transportation (TxDOT), Dallas Area Rapid Transit (DART), the North Central Texas Council of Governments (NCTCOG), and the Texas Transportation Institute (TTI). The intent of this effort is to assist in the development of an area-wide freeway/HOV system that recognizes implementation constraints (right-of-way and construction costs) and provides reasonable peak-hour operating conditions on all freeway facilities, while incorporating the long-range plans developed by TxDOT, DART, and NCTCOG. The proposed system is a set of recommendations to be considered and evaluated as partmore » of the development of the NCTCOG Mobility 2010 Plan Update, the long-range transportation plan for the Dallas area. HOV facilities are a significant part of the recommended system in the Dallas System Planning Study, and their implementation is important to the successful operation of the Dallas area transportation system in the future. The report, therefore, focuses on the recommended HOV improvements from the methodology.« less

  12. The Copernican Plan: Restructuring the American High School.

    ERIC Educational Resources Information Center

    Carroll, Joseph M.

    A new perspective on the practical problems of changing secondary schools to enhance learning is called "the Copernican Plan" because its implementation would change the schools as completely as Copernicus's ideas changed the perception of our solar system. The plan proposes major restructuring of virtually all the basic systems within a…

  13. Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India.

    PubMed

    Samal, Janmejaya

    2015-01-01

    AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1(st)5-year plan. A progressive path of development could be observed since the first to the 12(th)5-year plan. It was up to the 7(th)plan the growth was little sluggish and from 8(th)plan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11(th)5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of "Mainstreaming of AYUSH and revitalization of local health traditions" to strengthen public health services. This scheme is currently in operation in its second phase, since 1(st)April 2012, with the 12(th)5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1(st)plan to 12(th)plan, to enable reflection and throw some light into the future directions of AYUSH system.

  14. 75 FR 56928 - Approval and Promulgation of State Implementation Plan Revisions; State of North Dakota...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... typical movement of weather systems. Thus, geography, topography and meteorology of the region that... obstacles to ozone transport from North Dakota to California. Thus, geography and topography reduce the... proposing partial approval of the State Implementation Plan (SIP) revisions called ``Interstate Transport of...

  15. Missouri commercial vehicle operations : state business plan

    DOT National Transportation Integrated Search

    1998-05-15

    This business plan is intended to assist this state in improving its commercial vehicle operation regulation, guide the deployment and installation of intelligent transportation systems and to implement these systems in an efficient and cost effectiv...

  16. Strategic Information Systems Planning.

    ERIC Educational Resources Information Center

    Rowley, Jennifer

    1995-01-01

    Strategic Information Systems Planning (SISP) is the process of establishing a program for implementation and use of information systems in ways that will optimize effectiveness of information resources and use them to support the objectives of the organization. Basic steps in SISP methodology are outlined. (JKP)

  17. Case study of open-source enterprise resource planning implementation in a small business

    NASA Astrophysics Data System (ADS)

    Olson, David L.; Staley, Jesse

    2012-02-01

    Enterprise resource planning (ERP) systems have been recognised as offering great benefit to some organisations, although they are expensive and problematic to implement. The cost and risk make well-developed proprietorial systems unaffordable to small businesses. Open-source software (OSS) has become a viable means of producing ERP system products. The question this paper addresses is the feasibility of OSS ERP systems for small businesses. A case is reported involving two efforts to implement freely distributed ERP software products in a small US make-to-order engineering firm. The case emphasises the potential of freely distributed ERP systems, as well as some of the hurdles involved in their implementation. The paper briefly reviews highlights of OSS ERP systems, with the primary focus on reporting the case experiences for efforts to implement ERPLite software and xTuple software. While both systems worked from a technical perspective, both failed due to economic factors. While these economic conditions led to imperfect results, the case demonstrates the feasibility of OSS ERP for small businesses. Both experiences are evaluated in terms of risk dimension.

  18. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    NASA Technical Reports Server (NTRS)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  19. Advancing mission in the marketplace. Integrated strategic planning and budgeting helps a system remain accountable.

    PubMed

    Smessaert, A H

    1992-10-01

    In the late 1980s Holy Cross Health System (HCHS), South Bend, IN, began to implement a revised strategic planning and budgeting process to effectively link the system's mission with its day-to-day operations. Leaders wanted a process that would help system employees internalize and act on the four major elements articulated in the HCHS mission statement: fidelity, excellence, empowerment, and stewardship. Representatives from mission, strategic planning, and finance from the corporate office and subsidiaries examined planning and budgeting methods. From the beginning, HCHS leaders decided that the process should be implemented gradually, with each step focusing on refining methodology and improving mission integration. As the process evolved. HCHS developed a sequence in which planning preceded budgeting. The system also developed a variety of educational and collaborative initiatives to help system employees adapt to the organization's change of direction. One critical aspect of HCHS's ongoing education is an ethical reflection process that helps participants balance ethical considerations by viewing an issue from three perspectives: social vision, multiple responsibility, and self-interest.

  20. Computerized physician order entry from a chief information officer perspective.

    PubMed

    Cotter, Carole M

    2004-12-01

    Designing and implementing a computerized physician order entry system in the critical care units of a large urban hospital system is an enormous undertaking. With their significant potential to improve health care and significantly reduce errors, the time for computerized physician order entry or physician order management systems is past due. Careful integrated planning is the key to success, requiring multidisciplinary teams at all levels of clinical and administrative management to work together. Articulated from the viewpoint of the Chief Information Officer of Lifespan, a not-for-profit hospital system in Rhode Island, the vision and strategy preceding the information technology plan, understanding the system's current state, the gap analysis between current and future state, and finally, building and implementing the information technology plan are described.

  1. User manual and spreadsheet tool for implementing performance planning for rural planning organizations.

    DOT National Transportation Integrated Search

    2017-03-01

    The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...

  2. Plan Recognition using Statistical Relational Models

    DTIC Science & Technology

    2014-08-25

    arguments. Section 4 describes several variants of MLNs for plan recognition. All MLN mod- els were implemented using Alchemy (Kok et al., 2010), an...For both MLN approaches, we used MC-SAT (Poon and Domingos, 2006) as implemented in the Alchemy system on both Monroe and Linux. Evaluation Metric We...Singla P, Poon H, Lowd D, Wang J, Nath A, Domingos P. The Alchemy System for Statistical Relational AI. Techni- cal Report; Department of Computer Science

  3. The Microcomputer in the Library: VI. Implementation and Future Development.

    ERIC Educational Resources Information Center

    Leggate, Peter; Dyer, Hilary

    1986-01-01

    This sixth article in a series discusses planning for the installation and implementation of automated systems in the library, workstation design and location, scheduling of software implementation, security, data input, staff and reader training, job design, impact of automation on library procedures, evaluation of system performance, and future…

  4. ERP Project Management Lessons Learned

    ERIC Educational Resources Information Center

    Carroll, Timothy D.

    2009-01-01

    Implementing an enterprise resource planning (ERP) system is a major undertaking for any higher education institution, with many challenges along the way. More than three years ago, Roane State Community College began a journey to implement an ERP system. Roane State recently completed a very successful implementation of the SunGard Banner Student…

  5. 44 CFR 208.3 - Authority for the National US&R Response System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...

  6. 44 CFR 208.3 - Authority for the National US&R Response System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...

  7. 44 CFR 208.3 - Authority for the National US&R Response System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...

  8. 44 CFR 208.3 - Authority for the National US&R Response System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...

  9. 44 CFR 208.3 - Authority for the National US&R Response System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...

  10. Fall of the Integrated Planning System

    DTIC Science & Technology

    2012-05-17

    operations planning processes. Any service planner can lead the implementation of JOPP because he is familiar with the process and the products . The...discontinued the use of IPS. One can ask, why was IPS withdrawn so soon after its implementation ? This monograph explores the reasons behind the short...IPS raises the question, why was IPS withdrawn so soon after its implementation . This monograph explores the reasons behind the short lifespan of the

  11. Development and implementation of a real-time control strategy for the sewer system of the city of Vienna.

    PubMed

    Fuchs, L; Beeneken, T

    2005-01-01

    The paper describes the realization of a real-time control for the Vienna sewer system. The project is scheduled for completion for 2004. The 3.5 year project comprises all planning stages starting with the recording of data up to the planning of measuring and controlling units. The concrete steps of the planning stages are explained. A measuring system including 25 rainfall measurements, 40 flow measurements and 20 water level measurements is implemented as an online system. This measuring system is designed to achieve two objectives, on the one hand the real-time control and on the other hand the calibration of the model that is used for the hydrodynamic sewer system simulation. The approx. 53,000 pipes have served to generate a coarse network of no more than approx. 2600 pipes. The area data were derived with high accuracy from available aerial photograph interpretations. With simulation runs of a rule-based control software the system operation was examined. A self-learning system will improve the rule basis. A forecasting model that uses weather observation radar will additionally influence the controlling decisions. The findings from the investigations are immediately considered in the planning of measuring and control units. The simulated results for the first phase of implementation, which demonstrate the benefit of RTC for the Vienna sewer system, are explained.

  12. Planning and design of a knowledge based system for green manufacturing management

    NASA Astrophysics Data System (ADS)

    Kamal Mohd Nawawi, Mohd; Mohd Zuki Nik Mohamed, Nik; Shariff Adli Aminuddin, Adam

    2013-12-01

    This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization.

  13. Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

    NASA Technical Reports Server (NTRS)

    Davis, Randal; Thalman, Nancy

    1993-01-01

    The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

  14. [Integration of the radiotherapy irradiation planning in the digital workflow].

    PubMed

    Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E

    2013-02-01

    At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.

  15. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  16. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  17. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  18. Critical Success Factors for the Implementation of PeopleSoft Enterprise Resource Planning in a Public Organization

    ERIC Educational Resources Information Center

    Mukkamala, Hemanth K.

    2013-01-01

    Organizations of different sizes are changing their information technology (IT) strategies in order to achieve efficiency and effectiveness in today's global economy and to integrate their internal and external information by implementing PeopleSoft Enterprise Resource Planning (ERP) systems. The literature has case studies of successful and…

  19. Improving Training in Enterprise Resource Planning Systems Implementation through Communities of Practice

    ERIC Educational Resources Information Center

    Kerr, Don; Burgess, Kevin J.; Houghton, Luke; Murray, Peter A.

    2012-01-01

    The Enterprise Resource Planning (ERP) literature suggests that effective training is one of the key reasons for success in ERP implementations. However, limited research has been conducted on what constitutes effective training in an ERP environment. A case study approach was used to explore the effectiveness of traditional training and to…

  20. Staff Concerns in Schools Planning for and Implementing School-Wide Positive Behavior Interventions and Supports

    ERIC Educational Resources Information Center

    Tyre, Ashli D.; Feuerborn, Laura L.; Woods, Leslie

    2018-01-01

    Understanding staff concerns about a systemic change effort allows leadership teams to better anticipate and address staff needs for professional development and support. In this study, staff concerns in nine schools planning for or implementing School-Wide Positive Behavior Interventions and Supports (SWPBIS) were explored using the…

  1. A multi-institutional dosimetry audit of rotational intensity-modulated radiotherapy.

    PubMed

    Clark, Catharine H; Hussein, Mohammad; Tsang, Yatman; Thomas, Russell; Wilkinson, Dean; Bass, Graham; Snaith, Julia; Gouldstone, Clare; Bolton, Steve; Nutbrown, Rebecca; Venables, Karen; Nisbet, Andrew

    2014-11-01

    Rotational IMRT (VMAT and Tomotherapy) has now been implemented in many radiotherapy centres. An audit to verify treatment planning system modelling and treatment delivery has been undertaken to ensure accurate clinical implementation. 34 institutions with 43 treatment delivery systems took part in the audit. A virtual phantom planning exercise (3DTPS test) and a clinical trial planning exercise were planned and independently measured in each institution using a phantom and array combination. Point dose differences and global gamma index (γ) were calculated in regions corresponding to PTVs and OARs. Point dose differences gave a mean (±sd) of 0.1±2.6% and 0.2±2.0% for the 3DTPS test and clinical trial plans, respectively. 34/43 planning and delivery combinations achieved all measured planes with >95% pixels passing γ<1 at 3%/3mm and rose to 42/43 for clinical trial plans. A statistically significant difference in γ pass rates (p<0.01) was seen between planning systems where rotational IMRT modelling had been designed for the manufacturer's own treatment delivery system and those designed independently of rotational IMRT delivery. A dosimetry audit of rotational radiotherapy has shown that TPS modelling and delivery for rotational IMRT can achieve high accuracy of plan delivery. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  2. Paratransit Handbook : a Guide to Paratransit Implementation : Volume 1. Parts 1-3.

    DOT National Transportation Integrated Search

    1979-01-01

    This Paratransit Handbook has been developed to aid public officials, planners and system operators in planning, designing, implementing, operating and evaluating integrated paratransit systems. The Handbook represents a compedium of techniques and e...

  3. Application of automatic vehicle location in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Hansen, G. R.; Leflang, W. G.

    1976-01-01

    A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.

  4. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less

  5. Roosevelt-Vanderbilt alternative transportation system implementation plan : phase 2

    DOT National Transportation Integrated Search

    2004-12-01

    This is the second phase of a plan to identify components of a sustainable and effective alternative transportation system that will provide improved access to, and connections among, the Roosevelt-Vanderbilt National Historic Site units. The goal is...

  6. Automated Procurement System (APS) revised project management plan (DS-03)

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  7. An implementation plan for priorities in solar-system space physics

    NASA Technical Reports Server (NTRS)

    Krimigis, Stamatios M.; Athay, R. Grant; Baker, Daniel; Fisk, Lennard A.; Fredricks, Robert W.; Harvey, John W.; Jokipii, Jack R.; Kivelson, Margaret; Mendillo, Michael; Nagy, Andrew F.

    1985-01-01

    The scientific objectives and implementation plans and priorities of the Space Science Board in areas of solar physics, heliospheric physics, magnetospheric physics, upper atmosphere physics, solar-terrestrial coupling, and comparative planetary studies are discussed and recommended programs are summarized. Accomplishments of Skylab, Solar Maximum Mission, Nimbus-7, and 11 other programs are highlighted. Detailed mission plans in areas of solar and heliospheric physics, plasma physics, and upper atmospheric physics are also described.

  8. A Historical Analysis of the Leadership and Strategic Plan of Chancellor Stephen R. Portch in the University System of Georgia

    ERIC Educational Resources Information Center

    Fairchild-Pierce, Jennifer Elis

    2008-01-01

    This dissertation provides historical insight into the design and implementation of one strategic plan of a public higher education system in an effort to inform future similar strategic planning processes. On July 1, 1994, the Board of Regents appointed Stephen R. Portch the ninth Chancellor of the University System of Georgia. The timing was…

  9. Budgeting by Objectives--How Goals and Objectives, Operational Activities, and Resource Allocation Are Integrated in a Planning System. AIR 1984 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Capoor, Madan

    The Objective-Based Assessment, Planning, and Resource Allocation System (OAPRAS) that was developed and implemented at Middlesex County College is described. The integrated self-assessment planning and budgeting system was developed in 1981. The central purpose of OAPRAS was to link resource allocation decisions to the prioritized objectives that…

  10. Traveling through Time: The Forum Guide to Longitudinal Data Systems. Book Two of Four: Planning and Developing an LDS. NFES 2011-804

    ERIC Educational Resources Information Center

    National Forum on Education Statistics, 2010

    2010-01-01

    This document, "Book Two of Four: Planning and Developing an LDS", is the second installment of this Forum (National Forum on Education Statistics) series of guides on longitudinal data systems (LDS). This second book in the guide series delves into the planning, implementation, and evaluation phases of a longitudinal data system (LDS)…

  11. PyCMSXiO: an external interface to script treatment plans for the Elekta® CMS XiO treatment planning system

    NASA Astrophysics Data System (ADS)

    Xing, Aitang; Arumugam, Sankar; Holloway, Lois; Goozee, Gary

    2014-03-01

    Scripting in radiotherapy treatment planning systems not only simplifies routine planning tasks but can also be used for clinical research. Treatment planning scripting can only be utilized in a system that has a built-in scripting interface. Among the commercially available treatment planning systems, Pinnacle (Philips) and Raystation (Raysearch Lab.) have inherent scripting functionality. CMS XiO (Elekta) is a widely used treatment planning system in radiotherapy centres around the world, but it does not have an interface that allows the user to script radiotherapy plans. In this study an external scripting interface, PyCMSXiO, was developed for XiO using the Python programming language. The interface was implemented as a python package/library using a modern object-oriented programming methodology. The package was organized as a hierarchy of different classes (objects). Each class (object) corresponds to a plan object such as the beam of a clinical radiotherapy plan. The interface of classes was implemented as object functions. Scripting in XiO using PyCMSXiO is comparable with Pinnacle scripting. This scripting package has been used in several research projects including commissioning of a beam model, independent three-dimensional dose verification for IMRT plans and a setup-uncertainty study. Ease of use and high-level functions provided in the package achieve a useful research tool. It was released as an open-source tool that may benefit the medical physics community.

  12. Web-based GIS for collaborative planning and public participation: an application to the strategic planning of wind farm sites.

    PubMed

    Simão, Ana; Densham, Paul J; Haklay, Mordechai Muki

    2009-05-01

    Spatial planning typically involves multiple stakeholders. To any specific planning problem, stakeholders often bring different levels of knowledge about the components of the problem and make assumptions, reflecting their individual experiences, that yield conflicting views about desirable planning outcomes. Consequently, stakeholders need to learn about the likely outcomes that result from their stated preferences; this learning can be supported through enhanced access to information, increased public participation in spatial decision-making and support for distributed collaboration amongst planners, stakeholders and the public. This paper presents a conceptual system framework for web-based GIS that supports public participation in collaborative planning. The framework combines an information area, a Multi-Criteria Spatial Decision Support System (MC-SDSS) and an argumentation map to support distributed and asynchronous collaboration in spatial planning. After analysing the novel aspects of this framework, the paper describes its implementation, as a proof of concept, in a system for Web-based Participatory Wind Energy Planning (WePWEP). Details are provided on the specific implementation of each of WePWEP's four tiers, including technical and structural aspects. Throughout the paper, particular emphasis is placed on the need to support user learning throughout the planning process.

  13. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  14. Multi-community command and control systems in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.

    1976-01-01

    A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.

  15. Implementation of a best management practice (BMP) system for a clay mining facility in Taiwan.

    PubMed

    Lin, Jen-Yang; Chen, Yen-Chang; Chen, Walter; Lee, Tsu-Chuan; Yu, Shaw L

    2006-01-01

    The present paper describes the planning and implementation of a best management practice (BMP) system for a clay mining facility in Northern Taiwan. It is a challenge to plan and design BMPs for mitigating the impact of clay mining operations due to the fact that clay mining drainage typically contains very high concentrations of suspended solids (SS), Fe-ions, and [H+] concentrations. In the present study, a field monitoring effort was conducted to collect data for runoff quality and quantity from a clay mining area in Northern Taiwan. A BMP system including holding ponds connected in series was designed and implemented and its pollutant removal performance was assessed. The assessment was based on mass balance computations and an analysis of the relationship between BMP design parameters such as pond depth, detention time, surface loading rate, etc. and the pollutant removal efficiency. Field sampling results showed that the surface-loading rate is exponential related to the removing rate. The results provide the basis for a more comprehensive and efficient BMP implementation plan for clay mining operations.

  16. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  17. Execution monitoring for a mobile robot system

    NASA Technical Reports Server (NTRS)

    Miller, David P.

    1990-01-01

    Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.

  18. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    NASA Technical Reports Server (NTRS)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  19. Strategic Planning Tools for Large-Scale Technology-Based Assessments

    ERIC Educational Resources Information Center

    Koomen, Marten; Zoanetti, Nathan

    2018-01-01

    Education systems are increasingly being called upon to implement new technology-based assessment systems that generate efficiencies, better meet changing stakeholder expectations, or fulfil new assessment purposes. These assessment systems require coordinated organisational effort to implement and can be expensive in time, skill and other…

  20. Development and implementation of an interdisciplinary plan of care.

    PubMed

    Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff

    2005-01-01

    In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.

  1. New York State Department of Transportation, Lower Hudson Valley, Region 8 : intelligent transportation systems early deployment planning study

    DOT National Transportation Integrated Search

    1998-11-01

    The purpose of this study is to provide the framework for future implementation of Intelligent Transportation Systems (ITS) in the Lower Hudson Valley area. The focus of the planning study is the regional freeway system, major arterial routes and the...

  2. Kentucky Allied Health Project Final Report: A State System for Allied Health Education.

    ERIC Educational Resources Information Center

    Kentucky State Council on Higher Education, Frankfort.

    The accomplishments of the Kentucky Allied Health Project, which implemented a model articulated system of allied health education, are described. The system included plans to promote transition from one education level to another and articulation in educational planning and resource utilization. The project has greatly increased…

  3. Use of the recreation opportunity planning system to inventory recreation opportunities of arid lands

    Treesearch

    Perry J. Brown; B. L. Driver; Joseph K. Berry

    1981-01-01

    Recreation opportunity planning, which is being adopted by some land management agencies for recreation input to land management planning, is reviewed for its applicability to arid land situations. Particular attention is given to the inventory and analysis phases of the system and to what we have learned about its implementation during its development.

  4. We have the programme, what next? Planning the implementation of an injury prevention programme

    PubMed Central

    Donaldson, Alex; Lloyd, David G; Gabbe, Belinda J; Cook, Jill

    2017-01-01

    Background and aim The impact of any injury prevention programme is a function of the programme and its implementation. However, real world implementation of injury prevention programmes is challenging. Lower limb injuries (LLIs) are common in community Australian football (community-AF) and it is likely that many could be prevented by implementing exercise-based warm-up programmes for players. This paper describes a systematic, evidence-informed approach used to develop the implementation plan for a LLI prevention programme in community-AF in Victoria, Australia. Methods An ecological approach, using Step 5 of the Intervention Mapping health promotion programme planning protocol, was taken. Results An implementation advisory group was established to ensure the implementation plan and associated strategies were relevant to the local context. Coaches were identified as the primary programme adopters and implementers within an ecological system including players, other coaches, first-aid providers, and club and league administrators. Social Cognitive Theory was used to identify likely determinants of programme reach, adoption and implementation among coaches (eg, knowledge, beliefs, skills and environment). Diffusion of Innovations theory, the Implementation Drivers framework and available research evidence were used to identify potential implementation strategies including the use of multiple communication channels, programme resources, coach education and mentoring. Conclusions A strategic evidence-informed approach to implementing interventions will help maximise their population impact. The approach to implementation planning described in this study relied on an effective researcher-practitioner partnership and active engagement of stakeholders. The identified implementation strategies were informed by theory, evidence and an in-depth understanding of the implementation context. PMID:26787739

  5. Application of mobile digital communications in law enforcement, an introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Abraham, J. E.; Leflang, W. G.; Kennedy, R. D.; Wilson, J. H.; Gurfield, R. M.

    1975-01-01

    A set of planning guidelines for the application of digital communications techniques to law enforcement use is presented. Some essential characteristics of digital techniques and their applications are outlined, as are some principles of system analysis, evaluation, and planning. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with respect to this application problem. Information on law enforcement digital communications systems and equipment and a list of vendor sources are given in appendices.

  6. Application of computer-aided dispatch in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.

    1975-01-01

    A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

  7. Concepts, requirements, and design approaches for building successful planning and scheduling systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1991-01-01

    Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

  8. Strategic Planning: An Integrated Academic Information Management System (IAIMS) at Georgetown University Medical Center. Volume 1, Implementation Plan. Volume 2, Planning Accomplishments. Volume 3, Environmental Forecast. Volume 4, Institutional Self Study.

    ERIC Educational Resources Information Center

    Broering, Naomi C.; And Others

    Strategic planning for an Integrated Academic Information Management System (IAIMS) for Georgetown University Medical Center is considered. The goal is to organize and transmit accessible and timely biomedical information where it is needed. Activities are proposed for education, research, patient care, management, sharing information on…

  9. 77 FR 76815 - Handling of Animals; Contingency Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... contingency plan system be implemented to accommodate small businesses. As a practical matter, one would... No. APHIS-2006-0159] RIN 0579-AC69 Handling of Animals; Contingency Plans AGENCY: Animal and Plant... regulations to add requirements for contingency planning and training of personnel by research facilities and...

  10. Paradigms, Power, and PR in New York City: Assessing Two School Accountability Implementation Efforts

    ERIC Educational Resources Information Center

    Peck, Craig

    2014-01-01

    This policy study critically compares two different efforts to implement an accountability system in the New York City public schools. In 1971, the New York City Board of Education contracted with the Educational Testing Service (ETS), which created a lengthy accountability plan for the district. Fitful maneuvers to execute the ETS plan fizzled…

  11. The Center for In-Service Education. Final Evaluation Report. Volume I. Part 1.

    ERIC Educational Resources Information Center

    Tennessee State Dept. of Education, Nashville.

    The primary objectives of the Center for In-Service Education in implementing a model for in-service education were to a) implement and demonstrate the comprehensive in-service model developed during the planning phase, b) provide coordinated planning of in-service education for all participating school systems, c) directly assist regional…

  12. Implementation plan for HANDI 2000 TWRS master equipment list

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  13. Road weather information system statewide implementation plan.

    DOT National Transportation Integrated Search

    2014-03-01

    The objective of this project was to develop a plan for deploying a statewide RWIS to support both current NYSDOT operations and future MDSS applications. To develop the plan, various information and data sources were investigated, including the curr...

  14. Project planning, training, measurement and sustainment: the successful implementation of voice recognition.

    PubMed

    Antiles, S; Couris, J; Schweitzer, A; Rosenthal, D; Da Silva, R Q

    2000-01-01

    Computerized voice recognition systems (VR) can reduce costs and enhance service. The capital outlay required for conversion to a VR system is significant; therefore, it is incumbent on radiology departments to provide cost and service justifications to administrators. Massachusetts General Hospital (MGH) in Boston implemented VR over a two-year period and achieved annual savings of $530,000 and a 50% decrease in report throughput. Those accomplishments required solid planning and implementation strategies, training and sustainment programs. This article walks through the process, step by step, in the hope of providing a tool set for future implementations. Because VR has dramatic implications for workflow, a solid operational plan is needed when assessing vendors and planning for implementation. The goals for implementation should be to minimize operational disruptions and capitalize on efficiencies of the technology. Senior leadership--the department chair or vice-chair--must select the goals to be accomplished and oversee, manage and direct the VR initiative. The importance of this point cannot be overstated, since implementation will require behavior changes from radiologists and others who may not perceive any personal benefits. Training is the pivotal factor affecting the success of voice recognition, and practice is the only way for radiologists to enhance their skills. Through practice, radiologists will discover shortcuts, and their speed and comfort will improve. Measurement and data analysis are critical to changing and improving the voice recognition application and are vital to decision-making. Some of the issues about which valuable date can be collected are technical and educational problems, VR penetration, report turnaround time and annual cost savings. Sustained effort is indispensable to the maintenance of voice recognition. Finally, all efforts made and gains achieved may prove to be futile without ongoing sustainment of the system through retraining, education and technical support.

  15. SU-E-J-127: Implementation of An Online Replanning Tool for VMAT Using Flattening Filter-Free Beams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ates, O; Ahunbay, E; Li, X

    2015-06-15

    Purpose: This is to report the implementation of an online replanning tool based on segment aperture morphing (SAM) for VMAT with flattening filter free (FFF) beams. Methods: Previously reported SAM algorithm modified to accommodate VMAT with FFF beams was implemented in a tool that was interfaced with a treatment planning system (Monaco, Elekta). The tool allows (1) to output the beam parameters of the original VMAT plan from Monaco, and (2) to input the apertures generated from the SAM algorithm into Monaco for the dose calculation on daily CT/CBCT/MRI in the following steps:(1) Quickly generating target contour based on themore » image of the day, using an auto-segmentation tool (ADMIRE, Elekta) with manual editing if necessary; (2) Morphing apertures based on the SAM in the original VMAT plan to account for the interfractional change of the target from the planning to the daily images; (3) Calculating dose distribution for new apertures with the same numbers of MU as in the original plan; (4) Transferring the new plan into a record & verify system (MOSAIQ, Elekta); (5) Performing a pre-delivery QA based on software; (6) Delivering the adaptive plan for the fraction.This workflow was implemented on a 16-CPU (2.6 GHz dual-core) hardware with GPU and was tested for sample cases of prostate, pancreas and lung tumors. Results: The online replanning process can be completed within 10 minutes. The adaptive plans generally have improved the plan quality when compared to the IGRT repositioning plans. The adaptive plans with FFF beams have better normal tissue sparing as compared with those of FF beams. Conclusion: The online replanning tool based on SAM can quickly generate adaptive VMAT plans using FFF beams with improved plan quality than those from the IGRT repositioning plans based on daily CT/CBCT/MRI and can be used clinically. This research was supported by Elekta Inc. (Crawley, UK)« less

  16. Research and applications: Artificial intelligence

    NASA Technical Reports Server (NTRS)

    Raphael, B.; Duda, R. O.; Fikes, R. E.; Hart, P. E.; Nilsson, N. J.; Thorndyke, P. W.; Wilber, B. M.

    1971-01-01

    Research in the field of artificial intelligence is discussed. The focus of recent work has been the design, implementation, and integration of a completely new system for the control of a robot that plans, learns, and carries out tasks autonomously in a real laboratory environment. The computer implementation of low-level and intermediate-level actions; routines for automated vision; and the planning, generalization, and execution mechanisms are reported. A scenario that demonstrates the approximate capabilities of the current version of the entire robot system is presented.

  17. The Path to Successful ERP Implementation.

    ERIC Educational Resources Information Center

    Swartz, David G.

    2001-01-01

    Examines how universities and colleges can economically and efficiently implement an enterprise resource planning project when designing their administrative information system. Administrative steps discussed include conducting a needs assessment, deciding on the right system that matches the assessment, developing the correct contracting…

  18. Effects-based strategy development through center of gravity and target system analysis

    NASA Astrophysics Data System (ADS)

    White, Christopher M.; Prendergast, Michael; Pioch, Nicholas; Jones, Eric K.; Graham, Stephen

    2003-09-01

    This paper describes an approach to effects-based planning in which a strategic-theater-level mission is refined into operational-level and ultimately tactical-level tasks and desired effects, informed by models of the expected enemy response at each level of abstraction. We describe a strategy development system that implements this approach and supports human-in-the-loop development of an effects-based plan. This system consists of plan authoring tools tightly integrated with a suite of center of gravity (COG) and target system analysis tools. A human planner employs the plan authoring tools to develop a hierarchy of tasks and desired effects. Upon invocation, the target system analysis tools use reduced-order models of enemy centers of gravity to select appropriate target set options for the achievement of desired effects, together with associated indicators for each option. The COG analysis tools also provide explicit models of the causal mechanisms linking tasks and desired effects to one another, and suggest appropriate observable indicators to guide ISR planning, execution monitoring, and campaign assessment. We are currently implementing the system described here as part of the AFRL-sponsored Effects Based Operations program.

  19. 78 FR 23219 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ... National Forest System Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land... Federal Advisory Committee Act. The purpose of the committee is to provide advice and recommendations on...

  20. 78 FR 9883 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... National Forest System Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land... Advisory Committee Act. The purpose of the committee is to provide advice and recommendations on the...

  1. Using iKidTools™ Software Support Systems to Develop and Implement Self-Monitoring Interventions

    ERIC Educational Resources Information Center

    Patti, Angela L.; Miller, Kevin J.

    2011-01-01

    Educational teams often are faced with the task of developing and implementing Behavioral Intervention Plans (BIPs) for students who present challenging and/or disruptive behaviors. This article describes the steps used to develop and implement a self-monitoring BIP that incorporated an innovative software system, iKidTools™. An authentic case…

  2. Integration of Treatment Innovation Planning and Implementation: Strategic Process Models and Organizational Challenges

    PubMed Central

    Lehman, Wayne E. K.; Simpson, D. Dwayne; Knight, Danica K.; Flynn, Patrick M.

    2015-01-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A 2-phase procedural approach is therefore presented based on the integration of TCU models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. PMID:21443294

  3. Louisiana CVO/ITS business plan

    DOT National Transportation Integrated Search

    1998-06-01

    Louisianas CVO / ITS Business Plan provides a long-term strategic vision and implementation program for meeting Louisianas Commercial Vehicle Operations / Intelligent Transportation Systems (CVO / ITS) needs. Commercial Vehicle Operations - CVO...

  4. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  5. 76 FR 77300 - Alaska Federal Lands Long Range Transportation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... of and actions for coordinated planning and decision making among federal land management agencies... consolidate efforts through long-term coordination in transportation planning and decision-making processes... implementing projects; facilitating objective decision making for the transportation system; and developing...

  6. Impact of a mobile health aplication in the nursing care plan compliance of a home care service in Belo Horizonte, Minas Gerais, Brazil.

    PubMed

    de Britto, Felipe A; Martins, Tatiana B; Landsberg, Gustavo A P

    2015-01-01

    To assess impact of a mobile health solution in the nursing care plan compliance of a home care service. A retrospective cohort study was performed with 3,036 patients. Compliance rates before and after the implementation were compared. After the implementation of a mobile health aplication, compliance with the nursing care plan increased from 53% to 94%. The system reduced IT spending, increased the nursing team efficiency and prevented planned hiring. The use of a mobile health solution with geolocating feature by a nursing home care team increased compliance to the care plan.

  7. National strategic plan: modeling and data systems for wildland fire and air quality.

    Treesearch

    David V. Sandberg; Colin C. Hardy; Roger D. Ottmar; J.A. Kendall Snell; Ann Acheson; Janice L. Peterson; Paula Seamon; Peter Lahm; Dale Wade

    1999-01-01

    This strategic plan is a technical discussion of the implementation and development of models and data systems used to manage the air quality impacts of wildland and prescribed fires. Strategies and priorities in the plan were generated by the Express Team (chartered by the National Wildfire Coordinating Group) and a diverse group of 86 subject matter experts who...

  8. STS/Spacelab payload utilization planning study: Executive summary

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

  9. StarPlan: A model-based diagnostic system for spacecraft

    NASA Technical Reports Server (NTRS)

    Heher, Dennis; Pownall, Paul

    1990-01-01

    The Sunnyvale Division of Ford Aerospace created a model-based reasoning capability for diagnosing faults in space systems. The approach employs reasoning about a model of the domain (as it is designed to operate) to explain differences between expected and actual telemetry; i.e., to identify the root cause of the discrepancy (at an appropriate level of detail) and determine necessary corrective action. A development environment, named Paragon, was implemented to support both model-building and reasoning. The major benefit of the model-based approach is the capability for the intelligent system to handle faults that were not anticipated by a human expert. The feasibility of this approach for diagnosing problems in a spacecraft was demonstrated in a prototype system, named StarPlan. Reasoning modules within StarPlan detect anomalous telemetry, establish goals for returning the telemetry to nominal values, and create a command plan for attaining the goals. Before commands are implemented, their effects are simulated to assure convergence toward the goal. After the commands are issued, the telemetry is monitored to assure that the plan is successful. These features of StarPlan, along with associated concerns, issues and future directions, are discussed.

  10. Using C to build a satellite scheduling expert system: Examples from the Explorer Platform planning system

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Tuchman, Alan; Potter, William J.

    1991-01-01

    A C-based artificial intelligence (AI) development effort which is based on a software tools approach is discussed with emphasis on reusability and maintainability of code. The discussion starts with simple examples of how list processing can easily be implemented in C and then proceeds to the implementations of frames and objects which use dynamic memory allocation. The implementation of procedures which use depth first search, constraint propagation, context switching, and blackboard-like simulation environment are described. Techniques for managing the complexity of C-based AI software are noted, especially the object-oriented techniques of data encapsulation and incremental development. Finally, all these concepts are put together by describing the components of planning software called the Planning And Resource Reasoning (PARR) Shell. This shell was successfully utilized for scheduling services of the Tracking and Data Relay Satellite System for the Earth Radiation Budget Satellite since May of 1987 and will be used for operations scheduling of the Explorer Platform in Nov. of 1991.

  11. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  12. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  13. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  14. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  15. 17 CFR 242.608 - Filing and amendment of national market system plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... national market subsystem or facility contemplated by a national market system plan; (ii) Preparing and... date of completion of each phase; (C) An analysis of the impact on competition of implementation of the..., operation, or regulation of a national market system (or a subsystem thereof) or one or more facilities...

  16. PC-based Multiple Information System Interface (PC/MISI) design plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The general design plan for the implementation of a common user interface to multiple remote information systems within a microcomputer-based environment is presented. The intent is to provide a framework for the development of detailed specifications which will be used as guidelines for the actual development of the system.

  17. Implementing the incident command system in the healthcare setting.

    PubMed

    Huser, T J

    The author discusses a new requirement in NFPA 99 for healthcare facilities--the implementation of an Incident Command System in the event of a disaster. He offers suggestions on how facilities can change their disaster plans to meet this new standard.

  18. Arizona Road Weather Information System (RWIS) communications plan

    DOT National Transportation Integrated Search

    2003-04-01

    There have been two implementations of Roadway Weather Information Systems in Arizona, known as RWIS Phase 0 and Phase 1. Each Phase has met with limited success and has on-going issues that need to be addressed before new RWIS sites are implemented....

  19. Implementation and verification of nuclear interactions in a Monte-Carlo code for the Procom-ProGam proton therapy planning system

    NASA Astrophysics Data System (ADS)

    Kostyuchenko, V. I.; Makarova, A. S.; Ryazantsev, O. B.; Samarin, S. I.; Uglov, A. S.

    2014-06-01

    A great breakthrough in proton therapy has happened in the new century: several tens of dedicated centers are now operated throughout the world and their number increases every year. An important component of proton therapy is a treatment planning system. To make calculations faster, these systems usually use analytical methods whose reliability and accuracy do not allow the advantages of this method of treatment to implement to the full extent. Predictions by the Monte Carlo (MC) method are a "gold" standard for the verification of calculations with these systems. At the Institute of Experimental and Theoretical Physics (ITEP) which is one of the eldest proton therapy centers in the world, an MC code is an integral part of their treatment planning system. This code which is called IThMC was developed by scientists from RFNC-VNIITF (Snezhinsk) under ISTC Project 3563.

  20. Safe teleradiology: information assurance as project planning methodology.

    PubMed

    Collmann, Jeff; Alaoui, Adil; Nguyen, Dan; Lindisch, David

    2005-01-01

    The Georgetown University Medical Center Department of Radiology used a tailored version of OCTAVE, a self-directed information security risk assessment method, to design a teleradiology system that complied with the regulation implementing the security provisions of the Health Insurance Portability and Accountability Act (HIPAA) of 1996. The system addressed threats to and vulnerabilities in the privacy and security of protected health information. By using OCTAVE, Georgetown identified the teleradiology program's critical assets, described threats to the assurance of those assets, developed and ran vulnerability scans of a system pilot, evaluated the consequences of security breaches, and developed a risk management plan to mitigate threats to program assets, thereby implementing good information assurance practices. This case study illustrates the basic point that prospective, comprehensive planning to protect the privacy and security of an information system strategically benefits program management as well as system security.

  1. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  2. Accentra Pharmaceuticals: Thrashing through ERP Systems

    ERIC Educational Resources Information Center

    Bradds, Nathan; Hills, Emily; Masters, Kelly; Weiss, Kevin; Havelka, Douglas

    2017-01-01

    Implementing and integrating an Enterprise Resource Planning (ERP) system into an organization is an enormous undertaking that requires substantial cash outlays, time commitments, and skilled IT and business personnel. It requires careful and detailed planning, thorough testing and training, and a change management process that creates a…

  3. [Implementation of a safety and health planning system in a teaching hospital].

    PubMed

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  4. Development of 3-D Ice Accretion Measurement Method

    NASA Technical Reports Server (NTRS)

    Lee, Sam; Broeren, Andy P.; Addy, Harold E., Jr.; Sills, Robert; Pifer, Ellen M.

    2012-01-01

    A research plan is currently being implemented by NASA to develop and validate the use of a commercial laser scanner to record and archive fully three-dimensional (3-D) ice shapes from an icing wind tunnel. The plan focused specifically upon measuring ice accreted in the NASA Icing Research Tunnel (IRT). The plan was divided into two phases. The first phase was the identification and selection of the laser scanning system and the post-processing software to purchase and develop further. The second phase was the implementation and validation of the selected system through a series of icing and aerodynamic tests. Phase I of the research plan has been completed. It consisted of evaluating several scanning hardware and software systems against an established selection criteria through demonstrations in the IRT. The results of Phase I showed that all of the scanning systems that were evaluated were equally capable of scanning ice shapes. The factors that differentiated the scanners were ease of use and the ability to operate in a wide range of IRT environmental conditions.

  5. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    PubMed

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.

  6. Implementation of HIV and Tuberculosis Diagnostics: The Importance of Context

    PubMed Central

    Dominique, Joyelle K.; Ortiz-Osorno, Alberto A.; Fitzgibbon, Joseph; Gnanashanmugam, Devasena; Gilpin, Christopher; Tucker, Timothy; Peel, Sheila; Peter, Trevor; Kim, Peter; Smith, Steven

    2015-01-01

    Background. Novel diagnostics have been widely applied across human immunodeficiency virus (HIV) and tuberculosis prevention and treatment programs. To achieve the greatest impact, HIV and tuberculosis diagnostic programs must carefully plan and implement within the context of a specific healthcare system and the laboratory capacity. Methods. A workshop was convened in Cape Town in September 2014. Participants included experts from laboratory and clinical practices, officials from ministries of health, and representatives from industry. Results. The article summarizes best practices, challenges, and lessons learned from implementation experiences across sub-Saharan Africa for (1) building laboratory programs within the context of a healthcare system; (2) utilizing experience of clinicians and healthcare partners in planning and implementing the right diagnostic; and (3) evaluating the effects of new diagnostics on the healthcare system and on patient health outcomes. Conclusions. The successful implementation of HIV and tuberculosis diagnostics in resource-limited settings relies on careful consideration of each specific context. PMID:26409272

  7. Fact Sheet on Revisions to the Clean Air Act Section 110 Submission Requirements for State Implementation Plans and Notice of Availability of an Option for Electronic Reporting

    EPA Pesticide Factsheets

    On February 3, 2015, the U.S. Environmental Protection Agency notified state, local and tribal air agencies that they have the option to submit state implementation plans (SIPs) using the EPA’s new electronic web-based SIP (eSIP) submission system.

  8. 75 FR 70888 - Finding of Substantial Inadequacy of Implementation Plan; Call for Utah State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... FGD Systems During Downtime as a Function of PSD,'' from Edward E. Reich to G.T. Helms and January 28... in the index, some information is not publicly available, e.g., CBI or other information whose... alternatives. g. Explain your views as clearly as possible, avoiding the use of profanity or personal threats...

  9. A Plan for Revolutionary Change in Gas Turbine Engine Control System Architecture

    NASA Technical Reports Server (NTRS)

    Culley, Dennis E.

    2011-01-01

    The implementation of Distributed Engine Control technology on the gas turbine engine has been a vexing challenge for the controls community. A successful implementation requires the resolution of multiple technical issues in areas such as network communications, power distribution, and system integration, but especially in the area of high temperature electronics. Impeding the achievement has been the lack of a clearly articulated message about the importance of the distributed control technology to future turbine engine system goals and objectives. To resolve these issues and bring the technology to fruition has, and will continue to require, a broad coalition of resources from government, industry, and academia. This presentation will describe the broad challenges facing the next generation of advanced control systems and the plan which is being put into action to successfully implement the technology on the next generation of gas turbine engine systems.

  10. Minnesota Guidestar : Board of Directors' statewide ITS strategic plan 2000

    DOT National Transportation Integrated Search

    2000-03-01

    ITS Strategic Plan 2000 is Minnesota Guidestar Board of Directors' guide for implementation of an integrated statewide program for Intelligent Transportation Systems. The plan is intended to be used by the Board of Directors, as well as by the broad ...

  11. 78 FR 68811 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... National Forest System Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land... (FACA) (Pub. L. 92-463). The purpose of the Committee is to provide advice and recommendations on the...

  12. 78 FR 46565 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... National Forest System Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land... Committee Act (FACA) (Pub. L. 92-463). The purpose of the Committee is to provide advice and recommendations...

  13. Strategic Information Systems Planning in Malaysian Public Universities

    ERIC Educational Resources Information Center

    Ismail, Noor Azizi; Raja Mohd Ali, Raja Haslinda; Mat Saat, Rafeah; Hsbollah, Hafizah Mohamad

    2007-01-01

    Purpose: The paper's purpose is to investigate the current status, problems and benefits of strategic information systems planning implementation in Malaysian public universities. Design/methodology/approach: The study uses dual but mutually supportive strands of investigation, i.e. a questionnaire survey and interviews. Findings: Malaysian public…

  14. Cost Benefit Analysis of Enterprise Resource Planning System for the Naval Postgraduate School

    DTIC Science & Technology

    2002-06-01

    Department-wide introduction and use of appropriate commercial financial practices and reporting • Develop a strategic plan for implementing a business... Development of a process innovation approach given the current capabilities of the system, recommend possible alternatives to close gaps. E

  15. Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

  16. Planning and Implementing Augmentative Communication Service Delivery, 2: Proceedings of the National Planners Conference on Assistive Device Service Delivery.

    ERIC Educational Resources Information Center

    Coston, Caroline A., Ed.

    The document consists of 30 author contributed chapters concerned with augmentative communication service delivery. Chapter titles and authors are: "Communication Options for Persons Who Cannot Speak: Planning for Service Delivery" (David Beukelman); "Planning Service Delivery Systems" (Roland Hahn II); "Planning Ohio's…

  17. A Supplement to the Component Four Implementation Booklet. Broad Goal Definition in Emerald School District. SPECS: School Planning, Evaluation, and Communication System.

    ERIC Educational Resources Information Center

    Nagle, John M.; Walker, Harold E.

    The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. This…

  18. Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, DMS Industry Survey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singh, Ravindra; Uluski, Robert; Reilly, James T.

    The objective of this survey is to benchmark current practices for DMS implementation to serve as a guide for future system implementations. The survey sought information on current plans to implement DMS, DMS functions of interest, implementation challenges, functional benefits achieved, and other relevant information. These survey results were combined (where possible) with results of similar surveys conducted in the previous four years to observe trends over time.

  19. Towards the Implementation of the GEOSS Water Strategy

    NASA Astrophysics Data System (ADS)

    Lawford, R. G.; Cripe, D.

    2014-12-01

    Early in 2014, the Group on Earth Observations (GEO) adopted the GEOSS (Global Earth Observation System of Systems) Water Strategy as a potential guide for GEO-related water activities over the next decade. The Water Strategy outlines water-related issues and opportunities that fit within the general GEOSS framework that will be developed over the next decade (2016-2025). Implementation of a water strategy within the GEOSS framework can be complex because GEO Members and Participating Organizations contribute to GEO on a voluntary basis. In spite of these limitations efforts to consolidate an implementation plan have made significant advances during the past nine months. Progress towards the final GEOSS Water Strategy Implementation Plan will be reported and gaps in the plan will be identified. Specific responses to the strategy will address the need for user engagement, the development of integrated of data products, model hierarchies and user support systems, and the research that will be needed to expand the capabilities of GEOSS and its water services. One challenge for the implementation plan involves building a framework from the diverse and wide range of activities and opportunities presented by GEO Members and Participating Organizations. The priority themes within the GEO Water Strategy are being used to provide more focus for new initiatives. New activities related to these priority areas involving projects that link water and other GEO Societal Benefit Areas, as well as initiatives related to the Water-Energy-Food nexus and the Sustainable Development Goals will be described. The presentation will also explore the needs and opportunities for new satellites and other observational and information technologies to advance the implementation of the GEOSS water strategy objectives.

  20. 33 CFR 155.1020 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the organizational structure identified in a response plan to manage response plan implementation... equipment in a response plan for the applicable operating environment. Factors to consider include, but are... within the Captain of the Port (COTP) zone in which the systems or equipment are intended to function...

  1. Los Angeles congestion reduction demonstration (Metro ExpressLanes) program. National evaluation : surveys, interviews, and workshops test plan.

    DOT National Transportation Integrated Search

    1997-09-01

    Integration of intelligent transportation systems (ITS) within a metropolitan area is crucial for effective deployment. The Early Deployment Planning (EDP) Process is one tool that allows transportation officials to plan for and implement ITS technol...

  2. A Study of End Users' Perceived Usefulness of and Satisfaction with Enterprise Resource Planning Systems in Higher Education

    ERIC Educational Resources Information Center

    Su, Shau E. Eve

    2012-01-01

    Enterprise resource planning (ERP) systems have become necessities in today's educational arena and are used extensively to improve office productivity and institutional efficacy. As the implementation of ERP systems usually is costly and time-consuming, it is imperative for administrators to understand how end users adopt the introduced…

  3. Strategies of Educational Planning. Proceedings of the Annual Conference on the Economics of Education (2nd, Tallahassee, Florida, July, 1968).

    ERIC Educational Resources Information Center

    Kraft, Richard H.P., Ed.

    Eight papers focus on strategies for educational planning. In "Policy Formulation and Policy Implementation Relationships in an Educational System," Donald Miller asserts that performance relationships can be explained in terms of an educational system and its environment. Arnold Reisman and Martin Taft present "A Systems Approach…

  4. Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India

    PubMed Central

    Samal, Janmejaya

    2015-01-01

    AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1st5-year plan. A progressive path of development could be observed since the first to the 12th5-year plan. It was up to the 7thplan the growth was little sluggish and from 8thplan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11th5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of “Mainstreaming of AYUSH and revitalization of local health traditions” to strengthen public health services. This scheme is currently in operation in its second phase, since 1stApril 2012, with the 12th5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1stplan to 12thplan, to enable reflection and throw some light into the future directions of AYUSH system. PMID:26649240

  5. Incorporating Partners in Flight Priorities into State Agency Operational Plans: Development of a Management System for Wetland Passerines

    Treesearch

    Thomas P. Hodgman

    2005-01-01

    State agencies are often considered the prime avenues for implementation of Partners in Flight (PIF) bird conservation plans. Yet, such agencies already have in place a planning structure, which allows for dispersal of Federal Aid funds and guides management actions. Consequently, superimposing additional planning frameworks (e.g., PIF bird conservation plans) on state...

  6. A user interface for a knowledge-based planning and scheduling system

    NASA Technical Reports Server (NTRS)

    Mulvehill, Alice M.

    1988-01-01

    The objective of EMPRESS (Expert Mission Planning and Replanning Scheduling System) is to support the planning and scheduling required to prepare science and application payloads for flight aboard the US Space Shuttle. EMPRESS was designed and implemented in Zetalisp on a 3600 series Symbolics Lisp machine. Initially, EMPRESS was built as a concept demonstration system. The system has since been modified and expanded to ensure that the data have integrity. Issues underlying the design and development of the EMPRESS-I interface, results from a system usability assessment, and consequent modifications are described.

  7. Report: EPA Plans for Managing Counter Terrorism/ Emergency Response Equipment and Protecting Critical Assets Not Fully Implemented

    EPA Pesticide Factsheets

    Report #09-P-0087, January 27, 2009. EPA has progressed in implementing the counter terrorism/emergency response (CT/ER) initiatives, but is behind schedule in implementing the Radiation Ambient Monitoring (RadNet) System.

  8. 77 FR 33605 - Privacy Act of 1974: Implementation of Exemptions; Department of Homeland Security Office of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... operations center for the Department of Homeland Security.'' Through the NOC, OPS provides real-time...-003 Operations Collection, Planning, Coordination, Reporting, Analysis, and Fusion System of Records... System of Records.'' The DHS/OPS-003 Operations Collection, Planning, Coordination, Reporting, Analysis...

  9. Major Issues in the Design of New Educational Systems.

    ERIC Educational Resources Information Center

    Salisbury, David F.

    The necessity of design and planning for school restructuring with a macro focus on education systems design is discussed in this paper. Eight support and implementation strategies are identified: utilization of a formal change process; planned coordination; multiple sponsorship; formation of a grassroots collaboration network; external and…

  10. Schools as Open Social Systems: A Study of Site Specific Restructuring.

    ERIC Educational Resources Information Center

    Dellar, Graham B.

    This paper revisits the literature on the nature of school organizations and presents a view of secondary schools as complex social systems, as opposed to bureaucratic-rational structures. Research was conducted into three Western Australia secondary schools planning to implement school-based decision making and planning procedures. The…

  11. From Training to Learning in Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  12. Management by Objectives: A Tool for Accountability.

    ERIC Educational Resources Information Center

    Hopkins, Charles O.

    Many management styles in business and education today are not efficient, however the system of Management By Objectives (MBO) is proving to be successful. An MBO system basically has three parts: plan, implement, and review. In the planning stage the organization's purpose is defined, a mission statement developed, goals set, and objectives…

  13. Effective Professional Development Planning: The Wisconsin PDP

    ERIC Educational Resources Information Center

    Fischer, John A.

    2010-01-01

    Designed to improve PK-12 professional learning and increase student achievement, Wisconsin's policymakers developed and implemented new educator licensing guidelines (PI 34) and a Professional Development Plan (PDP) system based on empirical research and national policy trends in 2004. As PI 34 and the PDP system are relatively new, the…

  14. Feasibility of remote sensing for detecting thermal pollution. Part 1: Feasibility study. Part 2: Implementation plan. [coastal ecology

    NASA Technical Reports Server (NTRS)

    Veziroglu, T. N.; Lee, S. S.

    1973-01-01

    A feasibility study for the development of a three-dimensional generalized, predictive, analytical model involving remote sensing, in-situ measurements, and an active system to remotely measure turbidity is presented. An implementation plan for the development of the three-dimensional model and for the application of remote sensing of temperature and turbidity measurements is outlined.

  15. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.

  16. An Empirical Study of Implementing an Academic Unit Planning Tool: Implications for Institutional Research and Management. AIR Forum Paper 1978.

    ERIC Educational Resources Information Center

    Miyataki, Glenn K.

    The need to focus upon the organizational factors and consequences of a technological innovation is discussed and the outcome of the pilot implementation of the Academic Unit Planning Manual (AUPM) are reported. The primary intent of the AUPM, a tool developed at the National Center for Higher Education Management Systems (NCHEMS), is to assist…

  17. Application of science-based restoration planning to a desert river system.

    PubMed

    Laub, Brian G; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  18. Application of Science-Based Restoration Planning to a Desert River System

    NASA Astrophysics Data System (ADS)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  19. Application of science-based restoration planning to a desert river system

    USGS Publications Warehouse

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  20. Reengineering the picture archiving and communication system (PACS) process for digital imaging networks PACS.

    PubMed

    Horton, M C; Lewis, T E; Kinsey, T V

    1999-05-01

    Prior to June 1997, military picture archiving and communications systems (PACS) were planned, procured, and installed with key decisions on the system, equipment, and even funding sources made through a research and development office called Medical Diagnostic Imaging Systems (MDIS). Beginning in June 1997, the Joint Imaging Technology Project Office (JITPO) initiated a collaborative and consultative process for planning and implementing PACS into military treatment facilities through a new Department of Defense (DoD) contract vehicle called digital imaging networks (DIN)-PACS. The JITPO reengineered this process incorporating multiple organizations and politics. The reengineered PACS process administered through the JITPO transformed the decision process and accountability from a single office to a consultative method that increased end-user knowledge, responsibility, and ownership in PACS. The JITPO continues to provide information and services that assist multiple groups and users in rendering PACS planning and implementation decisions. Local site project managers are involved from the outset and this end-user collaboration has made the sometimes difficult transition to PACS an easier and more acceptable process for all involved. Corporately, this process saved DoD sites millions by having PACS plans developed within the government and proposed to vendors second, and then having vendors respond specifically to those plans. The integrity and efficiency of the process have reduced the opportunity for implementing nonstandard systems while sharing resources and reducing wasted government dollars. This presentation will describe the chronology of changes, encountered obstacles, and lessons learned within the reengineering of the PACS process for DIN-PACS.

  1. Role of GIS in social sector planning: can developing countries benefit from the examples of primary health care (PHC) planning in Britain?

    PubMed

    Ishfaq, Mohammad; Lodhi, Bilal Khan

    2012-04-01

    Social sector planning requires rational approaches where community needs are identified by referring to relative deprivation among localities and resources are allocated to address inequalities. Geographical information system (GIS) has been widely argued and used as a base for rational planning for equal resource allocation in social sectors around the globe. Devolution of primary health care is global strategy that needs pains taking efforts to implement it. GIS is one of the most important tools used around the world in decentralization process of primary health care. This paper examines the scope of GIS in social sector planning by concentration on primary health care delivery system in Pakistan. The work is based on example of the UK's decentralization process and further evidence from US. This paper argues that to achieve benefits of well informed decision making to meet the communities' needs GIS is an essential tool to support social sector planning and can be used without any difficulty in any environment. There is increasing trend in the use of Health Management Information System (HMIS) in Pakistan with ample internet connectivity which provides well established infrastructure in Pakistan to implement GIS for health care, however there is need for change in attitude towards empowering localities especially with reference to decentralization of decision making. This paper provides GIS as a tool for primary health care planning in Pakistan as a starting point in defining localities and preparing locality profiles for need identification that could help developing countries in implementing the change.

  2. A Capital Assets Preservation Program.

    ERIC Educational Resources Information Center

    Heiman, Ralph

    1989-01-01

    New York State officials have created an efficient capital planning system that is a prescribed set of procedures and actions within a program planning manual and two software modules. The program is a series of logical steps that school districts must take to successfully implement their preservation plans. (MLF)

  3. A Process for Planning.

    ERIC Educational Resources Information Center

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  4. Planning for successful outcomes in the new millennium.

    PubMed

    Matthews, P

    2000-02-01

    The complexity of the health care environment will increase in the next millennium. Organizations must adopt an approach of selecting outcomes management solutions that are focused on data capture, analysis, and comparative reviews and reporting. They must decisively and creatively implement, in a phased approach, integrated solutions from existing robust systems, while considering future systems targeted for implementation. Outcomes management solutions must be integrated with the organization's information systems strategic plan. The successful organization must be able to turn business-critical data into information that supports both business and clinical decision-making activities. In short, health care organizations will have to become information-driven.

  5. Distributed Planning in a Mixed-Initiative Environment: Collaborative Technologies for Network Centric Operations

    DTIC Science & Technology

    2008-10-01

    Agents in the DEEP architecture extend and use the Java Agent Development (JADE) framework. DEEP requires a distributed multi-agent system and a...framework to help simplify the implementation of this system. JADE was chosen because it is fully implemented in Java , and supports these requirements

  6. 77 FR 472 - National Advisory Committee for Implementation of the National Forest System Land Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... DEPARTMENT OF AGRICULTURE Forest Service National Advisory Committee for Implementation of the National Forest System Land Management Planning Rule; Correction AGENCY: USDA Forest Service. ACTION... for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1 (800) 877-8339 between 8...

  7. Buenos Aires - Toward Comprehensive Development and Sustainable Mobility

    NASA Astrophysics Data System (ADS)

    Kamrowska-Zaluska, Dorota

    2017-10-01

    This paper is introducing Buenos Aires’ achievements and challenges in implementing comprehensive development and integrating efficient and sustainable transport system within its urban structure. There are several important steps in this process starting from urban regeneration of Puerto Madero, the introduction and then implementation of a strategic plan Modelo territorial (2010) and of Buenos Aires’ Plan de Movilidad Sustentable (2013). The last one - Sustainable Mobility Plan helped Buenos Aires win several prestigious rewards for innovative approach to mobility and sustainable transport and leadership in combating climate change. Buenos Aires City government demonstrates strong leadership by implementing well-planned (Bus Rapid Transport) BRT solutions, stressing the importance of political will and support, flexibility and an open mind in listening to the points of view of all stakeholders involved. Buenos Aires has made a very important step toward sustainability by supporting development of more sustainable modes of transport, such as bicycle-sharing system and improving walkability of the city centre. The last initiative combined with strong focus on public spaces is adding to tourist attractiveness based on diversity of the capital of Argentina.

  8. The Power of the Frame: Systems Transformation Framework for Health Care Leaders.

    PubMed

    Scott, Kathy A; Pringle, Janice

    Health care leaders are responsible for oversight of multiple and competing change interventions. These interventions regularly fail to achieve the desired outcomes and/or sustainable results. This often occurs because of the mental models and approaches that are used to plan, design, implement, and evaluate the system. These do not account for inherent characteristics that determine the system's likely ability to innovate while maintaining operational effectiveness. Theories exist on how to assess a system's readiness to change, but the definitions, constructs, and assessments are diverse and often look at facets of systems in isolation. The Systems Transformation Framework prescriptively defines and characterizes system domains on the basis of complex adaptive systems theory so that domains can be assessed in tandem. As a result, strengths and challenges to implementation are recognized before implementation begins. The Systems Transformation Framework defines 8 major domains: vision, leadership, organizational culture, organizational behavior, organizational structure, performance measurements, internal learning, and external learning. Each domain has principles that are critical for creating the conditions that lead to successful organizational adaptation and change. The Systems Transformation Framework can serve as a guide for health care leaders at all levels of the organization to (1) create environments that are change ready and (2) plan, design, implement, and evaluate change within complex adaptive systems.

  9. Integration of treatment innovation planning and implementation: strategic process models and organizational challenges.

    PubMed

    Lehman, Wayne E K; Simpson, D Dwayne; Knight, Danica K; Flynn, Patrick M

    2011-06-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A two-phase procedural approach is therefore presented based on the integration of Texas Christian University (TCU) models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. (PsycINFO Database Record (c) 2011 APA, all rights reserved).

  10. Model compilation for real-time planning and diagnosis with feedback

    NASA Technical Reports Server (NTRS)

    Barrett, Anthony

    2005-01-01

    This paper describes MEXEC, an implemented micro executive that compiles a device model that can have feedback into a structure for subsequent evaluation. This system computes both the most likely current device mode from n sets of sensor measurements and the n-1 step reconfiguration plan that is most likely to result in reaching a target mode - if such a plan exists. A user tunes the system by increasing n to improve system capability at the cost of real-time performance.

  11. Implementation of an Analytical Model for Leakage Neutron Equivalent Dose in a Proton Radiotherapy Planning System

    PubMed Central

    Eley, John; Newhauser, Wayne; Homann, Kenneth; Howell, Rebecca; Schneider, Christopher; Durante, Marco; Bert, Christoph

    2015-01-01

    Equivalent dose from neutrons produced during proton radiotherapy increases the predicted risk of radiogenic late effects. However, out-of-field neutron dose is not taken into account by commercial proton radiotherapy treatment planning systems. The purpose of this study was to demonstrate the feasibility of implementing an analytical model to calculate leakage neutron equivalent dose in a treatment planning system. Passive scattering proton treatment plans were created for a water phantom and for a patient. For both the phantom and patient, the neutron equivalent doses were small but non-negligible and extended far beyond the therapeutic field. The time required for neutron equivalent dose calculation was 1.6 times longer than that required for proton dose calculation, with a total calculation time of less than 1 h on one processor for both treatment plans. Our results demonstrate that it is feasible to predict neutron equivalent dose distributions using an analytical dose algorithm for individual patients with irregular surfaces and internal tissue heterogeneities. Eventually, personalized estimates of neutron equivalent dose to organs far from the treatment field may guide clinicians to create treatment plans that reduce the risk of late effects. PMID:25768061

  12. Implementation of an analytical model for leakage neutron equivalent dose in a proton radiotherapy planning system.

    PubMed

    Eley, John; Newhauser, Wayne; Homann, Kenneth; Howell, Rebecca; Schneider, Christopher; Durante, Marco; Bert, Christoph

    2015-03-11

    Equivalent dose from neutrons produced during proton radiotherapy increases the predicted risk of radiogenic late effects. However, out-of-field neutron dose is not taken into account by commercial proton radiotherapy treatment planning systems. The purpose of this study was to demonstrate the feasibility of implementing an analytical model to calculate leakage neutron equivalent dose in a treatment planning system. Passive scattering proton treatment plans were created for a water phantom and for a patient. For both the phantom and patient, the neutron equivalent doses were small but non-negligible and extended far beyond the therapeutic field. The time required for neutron equivalent dose calculation was 1.6 times longer than that required for proton dose calculation, with a total calculation time of less than 1 h on one processor for both treatment plans. Our results demonstrate that it is feasible to predict neutron equivalent dose distributions using an analytical dose algorithm for individual patients with irregular surfaces and internal tissue heterogeneities. Eventually, personalized estimates of neutron equivalent dose to organs far from the treatment field may guide clinicians to create treatment plans that reduce the risk of late effects.

  13. Designing and Implementing a Distributed System Architecture for the Mars Rover Mission Planning Software (Maestro)

    NASA Technical Reports Server (NTRS)

    Goldgof, Gregory M.

    2005-01-01

    Distributed systems allow scientists from around the world to plan missions concurrently, while being updated on the revisions of their colleagues in real time. However, permitting multiple clients to simultaneously modify a single data repository can quickly lead to data corruption or inconsistent states between users. Since our message broker, the Java Message Service, does not ensure that messages will be received in the order they were published, we must implement our own numbering scheme to guarantee that changes to mission plans are performed in the correct sequence. Furthermore, distributed architectures must ensure that as new users connect to the system, they synchronize with the database without missing any messages or falling into an inconsistent state. Robust systems must also guarantee that all clients will remain synchronized with the database even in the case of multiple client failure, which can occur at any time due to lost network connections or a user's own system instability. The final design for the distributed system behind the Mars rover mission planning software fulfills all of these requirements and upon completion will be deployed to MER at the end of 2005 as well as Phoenix (2007) and MSL (2009).

  14. Practice, science and governance in interaction: European effort for the system-wide implementation of the International Classification of Functioning, Disability and Health (ICF) in Physical and Rehabilitation Medicine.

    PubMed

    Stucki, Gerold; Zampolini, Mauro; Juocevicius, Alvydas; Negrini, Stefano; Christodoulou, Nicolas

    2017-04-01

    Since its launch in 2001, relevant international, regional and national PRM bodies have aimed to implement the International Classification of Functioning, Disability and Health (ICF) in Physical and Rehabilitation Medicine (PRM), whereby contributing to the development of suitable practical tools. These tools are available for implementing the ICF in day-to-day clinical practice, standardized reporting of functioning outcomes in quality management and research, and guiding evidence-informed policy. Educational efforts have reinforced PRM physicians' and other rehabilitation professionals' ICF knowledge, and numerous implementation projects have explored how the ICF is applied in clinical practice, research and policy. Largely lacking though is the system-wide implementation of ICF in day-to-day practice across all rehabilitation services of national health systems. In Europe, system-wide implementation of ICF requires the interaction between practice, science and governance. Considering its mandate, the UEMS PRM Section and Board have decided to lead a European effort towards system-wide ICF implementation in PRM, rehabilitation and health care at large, in interaction with governments, non-governmental actors and the private sector, and aligned with ISPRM's collaboration plan with WHO. In this paper we present the current PRM internal and external policy agenda towards system-wide ICF implementation and the corresponding implementation action plan, while highlighting priority action steps - promotion of ICF-based standardized reporting in national quality management and assurance programs, development of unambiguous rehabilitation service descriptions using the International Classification System for Service Organization in Health-related Rehabilitation, development of Clinical Assessment Schedules, qualitative linkage and quantitative mapping of data to the ICF, and the cultural adaptation of the ICF Clinical Data Collection Tool in European languages.

  15. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  16. A knowledge-based approach to improving optimization techniques in system planning

    NASA Technical Reports Server (NTRS)

    Momoh, J. A.; Zhang, Z. Z.

    1990-01-01

    A knowledge-based (KB) approach to improve mathematical programming techniques used in the system planning environment is presented. The KB system assists in selecting appropriate optimization algorithms, objective functions, constraints and parameters. The scheme is implemented by integrating symbolic computation of rules derived from operator and planner's experience and is used for generalized optimization packages. The KB optimization software package is capable of improving the overall planning process which includes correction of given violations. The method was demonstrated on a large scale power system discussed in the paper.

  17. Tank waste remediation system systems engineering management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less

  18. Business continuity and disaster management within the public service in relation to a national development plan.

    PubMed

    Ferguson, Cliff

    2018-01-01

    Within South Africa, few public service departments understand the concepts of business continuity management (BCM) and what it takes to implement a well-constructed business continuity plan. Likewise, few of these entities understand the purpose of designing and maintaining resilient systems that are immune to incidents. This paper discusses the integration of the South African Disaster Management Act 2002, the Disaster Management Framework and the National Development Plan, linking these to BCM, through a resilience period model, as a means for the implementation of resilience strategies. The goals of the National Development Plan are outlined with a view to how resilience can be achieved in each. A resilience period model has been advocated for the implementation of projects within the public sector in order to provide continuity and sustainability.

  19. Voluntary coordination as a strategy of plan implementation for health systems agencies.

    PubMed

    Berry, D E; Candia, G R

    1979-10-01

    Health planning agencies are faced with the difficult mission of guiding change within a large complex social system whose power is dispersed. Initial short- and long-range plans have been established as frameworks, and now the major focus is implementation. Regulation (non-voluntary coordination) and voluntary coordination are the major means of implementation. Voluntary coordination is a significant strategy for consideration by Health Systems Agencies (HSAs). It may interact with regulation as a competitor, substitute, or complement. Because of limited regulatory powers, HSAs are dependent upon voluntary coordination as a major means of influencing behavior. Conflict, a major feature of voluntary coordination, has the potential of being used as a constructive means for dialogue; negotiation and bargaining may become positive approaches to arriving at decisions. Legitimized community authority is the primary source of authority in a strategy dominated by voluntary coordination as contrasted to state or federal mandates in a regulatory strategy. Knowledge of the environment within which the HSA operates will assist HSA staff and board to arrive at rational and realistic decisions.

  20. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  1. Resources planning for radiological incidents management

    NASA Astrophysics Data System (ADS)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  2. Railroad system of Texas: A component of the state and national transportation infrastructure. Research report, September 1996--November 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roop, S.S.; Warner, J.E.; Rosa, D.

    1998-11-01

    Railroads continue to play an important role in the Texas transportation system. This study addresses the potential for implementing a rail planning process in the Texas Department of Transportation. The study is documented in three reports, produced in coordinated and parallel efforts by the Center for Transportation Research and the Texas Transportation Institute. This report documents the work performed by TTI, whereby a rail planning framework is presented which formalizes the planning process and presents the key elements as a series of discrete and logical steps. These steps may be used to guide TxDOT in the formation of goals, identificationmore » of issues and affected parties, selection of appropriate analytical methodologies, location of data sources, and implementation of results. The report also presents an in-depth discussion of several key issues facing transportation agencies. These include rail line abandonment, intermodal service planning, and urban rail rationalization. A discussion of the Texas rail system covers the Class 1 railroads, shortline railroads, Amtrak, and the Mexican rail system.« less

  3. Matrix evaluation of science objectives

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.

    1994-01-01

    The most fundamental objective of all robotic planetary spacecraft is to return science data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, the quantitative analysis required to determine how the collection of science data drives ground system capabilities has received very little attention. This paper defines a process by which science objectives can be quantitatively evaluated. By applying it to the Cassini Mission to Saturn, this paper further illustrates the power of this technique. The results show which science objectives drive specific ground system capabilities. In addition, this process can assist system engineers and scientists in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during mission operations.

  4. Readiness factors for information system strategic planning among universities in developing countries: a systematic review

    NASA Astrophysics Data System (ADS)

    Irfan, M.; Putra, S. J.; Alam, C. N.; Subiyakto, A.; Wahana, A.

    2018-03-01

    The implementation of information system strategic planning (ISSP) in higher education institutions is to improve work efficiency, management effectiveness in order to improve organizational competitive advantage. However, the question of whether all universities are ready to implement ISSP as a way to achieve organizational goals has not been answered. This study aims to investigate the readiness phenomena through literature study. The method used is by using the Systematic Literature Review (SLR) instrument to identify readiness factors on the implementation of ISSP, especially among the institutions of higher education in developing countries. This study has identified 10 readiness measurement. There are three categories of measurement, namely people, processes and technologies that represent 11 factors of ISSP readiness measurement in universities.

  5. Efficient Digital Implementation of The Sigmoidal Function For Artificial Neural Network

    NASA Astrophysics Data System (ADS)

    Pratap, Rana; Subadra, M.

    2011-10-01

    An efficient piecewise linear approximation of a nonlinear function (PLAN) is proposed. This uses simulink environment design to perform a direct transformation from X to Y, where X is the input and Y is the approximated sigmoidal output. This PLAN is then used within the outputs of an artificial neural network to perform the nonlinear approximation. In This paper, is proposed a method to implement in FPGA (Field Programmable Gate Array) circuits different approximation of the sigmoid function.. The major benefit of the proposed method resides in the possibility to design neural networks by means of predefined block systems created in System Generator environment and the possibility to create a higher level design tools used to implement neural networks in logical circuits.

  6. Implementation of HIV and Tuberculosis Diagnostics: The Importance of Context.

    PubMed

    Dominique, Joyelle K; Ortiz-Osorno, Alberto A; Fitzgibbon, Joseph; Gnanashanmugam, Devasena; Gilpin, Christopher; Tucker, Timothy; Peel, Sheila; Peter, Trevor; Kim, Peter; Smith, Steven

    2015-10-15

    Novel diagnostics have been widely applied across human immunodeficiency virus (HIV) and tuberculosis prevention and treatment programs. To achieve the greatest impact, HIV and tuberculosis diagnostic programs must carefully plan and implement within the context of a specific healthcare system and the laboratory capacity. A workshop was convened in Cape Town in September 2014. Participants included experts from laboratory and clinical practices, officials from ministries of health, and representatives from industry. The article summarizes best practices, challenges, and lessons learned from implementation experiences across sub-Saharan Africa for (1) building laboratory programs within the context of a healthcare system; (2) utilizing experience of clinicians and healthcare partners in planning and implementing the right diagnostic; and (3) evaluating the effects of new diagnostics on the healthcare system and on patient health outcomes. The successful implementation of HIV and tuberculosis diagnostics in resource-limited settings relies on careful consideration of each specific context. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2015. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  7. NASA's Autonomous Formation Flying Technology Demonstration, Earth Observing-1(EO-1)

    NASA Technical Reports Server (NTRS)

    Folta, David; Bristow, John; Hawkins, Albin; Dell, Greg

    2002-01-01

    NASA's first autonomous formation flying mission, the New Millennium Program's (NMP) Earth Observing-1 (EO-1) spacecraft, recently completed its principal goal of demonstrating advanced formation control technology. This paper provides an overview of the evolution of an onboard system that was developed originally as a ground mission planning and operations tool. We discuss the Goddard Space Flight Center s formation flying algorithm, the onboard flight design and its implementation, the interface and functionality of the onboard system, and the implementation of a Kalman filter based GPS data smoother. A number of safeguards that allow the incremental phasing in of autonomy and alleviate the potential for mission-impacting anomalies from the on- board autonomous system are discussed. A comparison of the maneuvers planned onboard using the EO-1 autonomous control system to those from the operational ground-based maneuver planning system is presented to quantify our success. The maneuvers discussed encompass reactionary and routine formation maintenance. Definitive orbital data is presented that verifies all formation flying requirements.

  8. 78 FR 28776 - Approval and Promulgation of Implementation Plans; Georgia; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Section of this Federal Register, EPA is approving the State's implementation plan revision as a direct... Promulgation of Implementation Plans; Georgia; State Implementation Plan Miscellaneous Revisions AGENCY... State Implementation Plan (SIP) submitted by the Georgia Environmental Protection Division to EPA in...

  9. Developing the Systems Engineering Experience Accelerator (SEEA) Prototype and Roadmap

    DTIC Science & Technology

    2012-10-24

    system attributes. These metrics track non-requirements performance, typically relate to production cost per unit, maintenance costs, training costs...immediately implement lessons learned from the training experience to the job, assuming the culture allows this. 1.3 MANAGEMENT PLAN/TECHNICAL OVERVIEW...resolving potential conflicts as they arise. Incrementally implement and continuously integrate capability in priority order, to ensure that final system

  10. Going digital: a checklist in preparing for hospital-wide electronic medical record implementation and digital transformation.

    PubMed

    Scott, Ian A; Sullivan, Clair; Staib, Andrew

    2018-05-24

    Objective In an era of rapid digitisation of Australian hospitals, practical guidance is needed in how to successfully implement electronic medical records (EMRs) as both a technical innovation and a major transformative change in clinical care. The aim of the present study was to develop a checklist that clearly and comprehensively defines the steps that best prepare hospitals for EMR implementation and digital transformation. Methods The checklist was developed using a formal methodological framework comprised of: literature reviews of relevant issues; an interactive workshop involving a multidisciplinary group of digital leads from Queensland hospitals; a draft document based on literature and workshop proceedings; and a review and feedback from senior clinical leads. Results The final checklist comprised 19 questions, 13 related to EMR implementation and six to digital transformation. Questions related to the former included organisational considerations (leadership, governance, change leaders, implementation plan), technical considerations (vendor choice, information technology and project management teams, system and hardware alignment with clinician workflows, interoperability with legacy systems) and training (user training, post-go-live contingency plans, roll-out sequence, staff support at point of care). Questions related to digital transformation included cultural considerations (clinically focused vision statement and communication strategy, readiness for change surveys), management of digital disruption syndromes and plans for further improvement in patient care (post-go-live optimisation of digital system, quality and benefit evaluation, ongoing digital innovation). Conclusion This evidence-based, field-tested checklist provides guidance to hospitals planning EMR implementation and separates readiness for EMR from readiness for digital transformation. What is known about the topic? Many hospitals throughout Australia have implemented, or are planning to implement, hospital wide electronic medical records (EMRs) with varying degrees of functionality. Few hospitals have implemented a complete end-to-end digital system with the ability to bring about major transformation in clinical care. Although the many challenges in implementing EMRs have been well documented, they have not been incorporated into an evidence-based, field-tested checklist that can practically assist hospitals in preparing for EMR implementation as both a technical innovation and a vehicle for major digital transformation of care. What does this paper add? This paper outlines a 19-question checklist that was developed using a formal methodological framework comprising literature review of relevant issues, proceedings from an interactive workshop involving a multidisciplinary group of digital leads from hospitals throughout Queensland, including three hospitals undertaking EMR implementation and one hospital with complete end-to-end EMR, and review of a draft checklist by senior clinical leads within a statewide digital healthcare improvement network. The checklist distinguishes between issues pertaining to EMR as a technical innovation and EMR as a vehicle for digital transformation of patient care. What are the implications for practitioners? Successful implementation of a hospital-wide EMR requires senior managers, clinical leads, information technology teams and project management teams to fully address key operational and strategic issues. Using an issues checklist may help prevent any one issue being inadvertently overlooked or underemphasised in the planning and implementation stages, and ensure the EMR is fully adopted and optimally used by clinician users in an ongoing digital transformation of care.

  11. Analysis of the French system for persons in complex situation in regard of the implementation of a public policy aiming to integrate health and social services

    PubMed Central

    Somme, Dominique; de Stampa, Matthieu; Périsset, Catherine; Dupont, Olivier; Ankri, Joël; Saint-Jean, Olivier

    2009-01-01

    Introduction The French Alzheimer plan, states that one of its principle orientations is the implementation of ‘Homes for Integration and Autonomy for Alzheimer patients’. Alzheimer disease is taken as a model to implement integration for all persons in complex situation (handicap…). Method Seventeen experimental sites were selected in January 2009 for the first two years. They were selected by policy-makers taking into account the readiness of the local policy-makers to implement the program, the diversity of sizes of sites, the diversity of the experimentation leaders' organizational link (public administrations, not for profit organizations, private organizations) and the diversity of societal structure (rural, urban and mega-urban). The experimental sites were analyzed considering six components of integration: coordination boards, unique point of access, case-management, standardized assessment tool, individualized services plan and information system. A complete and computerized tool was specifically developed for the organizational diagnosis. Results During the session, results will be exposed. These results will give a contrasted image of the French system for persons in complex situation. The tool will be also exposed and the receptivity will be discussed. Conclusion The French Alzheimer plan gives a unique opportunity to have a portrait of the French system in regard of integration challenges.

  12. Experience measuring performance improvement in multiphase picture archiving and communications systems implementations.

    PubMed

    Reed, G; Reed, D H

    1999-05-01

    When planning a picture archiving and communications system (PACS) implementation and determining which equipment will be implemented in earlier and later phases, collection and analysis of selected data will aid in setting implementation priorities. If baseline data are acquired relative to performance objectives, the same information used for implementation planning can be used to measure performance improvement and outcomes. The main categories of data to choose from are: (1) financial data; (2) productivity data; (3) operational parameters; (4) clinical data; and (5) information about customer satisfaction. In the authors' experience, detailed workflow data have not proved valuable in measuring PACS performance and outcomes. Reviewing only one category of data in planning will not provide adequate basis for targeting operational improvements that will lead to the most significant gains. Quality improvement takes into account all factors in production: human capacity, materials, operating capital and assets. Once we have identified key areas of focus for quality improvement in each phase, we can translate objectives into implementation requirements and finally into detailed functional and performance requirements. Here, Integration Resources reports its experience measuring PACS performance relative to phased implementation strategies for three large medical centers. Each medical center had its own objectives for overcoming image management, physical/geographical, and functional/technical barriers. The report outlines (1) principal financial and nonfinancial measures used as performance indicators; (2) implementation strategies chosen by each of the three medical centers; and (3) the results of those strategies as compared with baseline data.

  13. 90-94 ITS Intercity Corridor Study - Strategic Deployment Plan

    DOT National Transportation Integrated Search

    1996-12-01

    PUBLIC-PRIVATE PARTNERSHIP, COMMERCIAL VEHICLES OPERATIONS OR CVO : THE IH 90/94 ITS INTERCITY CORRIDOR STRATEGIC DEPLOYMENT PLAN IS AN APPROACH FOR IMPLEMENTING INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE IH 90/94 CORRIDORS THAT TRAVERSE THE ...

  14. Tennessee long-range transportation plan : goals, objectives, and policies

    DOT National Transportation Integrated Search

    2005-12-01

    The mission of the Tennessee Department of Transportation (TDOT) is to plan, implement, maintain, and manage an integrated transportation system for the movement of people and products, with emphasis on quality, safety, efficiency, and the environmen...

  15. Model-based Executive Control through Reactive Planning for Autonomous Rovers

    NASA Technical Reports Server (NTRS)

    Finzi, Alberto; Ingrand, Felix; Muscettola, Nicola

    2004-01-01

    This paper reports on the design and implementation of a real-time executive for a mobile rover that uses a model-based, declarative approach. The control system is based on the Intelligent Distributed Execution Architecture (IDEA), an approach to planning and execution that provides a unified representational and computational framework for an autonomous agent. The basic hypothesis of IDEA is that a large control system can be structured as a collection of interacting agents, each with the same fundamental structure. We show that planning and real-time response are compatible if the executive minimizes the size of the planning problem. We detail the implementation of this approach on an exploration rover (Gromit an RWI ATRV Junior at NASA Ames) presenting different IDEA controllers of the same domain and comparing them with more classical approaches. We demonstrate that the approach is scalable to complex coordination of functional modules needed for autonomous navigation and exploration.

  16. IDEA: Planning at the Core of Autonomous Reactive Agents

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Dorais, Gregory A.; Fry, Chuck; Levinson, Richard; Plaunt, Christian; Clancy, Daniel (Technical Monitor)

    2002-01-01

    Several successful autonomous systems are separated into technologically diverse functional layers operating at different levels of abstraction. This diversity makes them difficult to implement and validate. In this paper, we present IDEA (Intelligent Distributed Execution Architecture), a unified planning and execution framework. In IDEA a layered system can be implemented as separate agents, one per layer, each representing its interactions with the world in a model. At all levels, the model representation primitives and their semantics is the same. Moreover, each agent relies on a single model, plan database, plan runner and on a variety of planners, both reactive and deliberative. The framework allows the specification of agents that operate, within a guaranteed reaction time and supports flexible specification of reactive vs. deliberative agent behavior. Within the IDEA framework we are working to fully duplicate the functionalities of the DS1 Remote Agent and extend it to domains of higher complexity than autonomous spacecraft control.

  17. Fault-free behavior of reliable multiprocessor systems: FTMP experiments in AIRLAB

    NASA Technical Reports Server (NTRS)

    Clune, E.; Segall, Z.; Siewiorek, D.

    1985-01-01

    This report describes a set of experiments which were implemented on the Fault tolerant Multi-Processor (FTMP) at NASA/Langley's AIRLAB facility. These experiments are part of an effort to formulate and evaluate validation methodologies for fault-tolerant computers. This report deals with the measurement of single parameters (baselines) of a fault free system. The initial set of baseline experiments lead to the following conclusions: (1) The system clock is constant and independent of workload in the tested cases; (2) the instruction execution times are constant; (3) the R4 frame size is 40mS with some variation; (4) the frame stretching mechanism has some flaws in its implementation that allow the possibility of an infinite stretching of frame duration. Future experiments are planned. Some will broaden the results of these initial experiments. Others will measure the system more dynamically. The implementation of a synthetic workload generation mechanism for FTMP is planned to enhance the experimental environment of the system.

  18. Long Range Plan for Embedded Computer Systems Support. Volume II

    DTIC Science & Technology

    1981-10-01

    interface (pilot displays and controls plus visual system), and data collection (CMAC data, bus data and simulation data). Non-real time functions include...unless adequate upfront planning is implemented, the command will be controlled by the dynamics rather than controll - ing them. The upfront planning should...or should they be called manually? What amount and type of data should the various tools pass between each other? Under what conditions and controls

  19. Written plans: an overlooked mechanism to develop recovery-oriented primary care for depression?

    PubMed

    Palmer, Victoria J; Johnson, Caroline L; Furler, John S; Densley, Konstancja; Potiriadis, Maria; Gunn, Jane M

    2014-01-01

    There is a global shift to foster patient-centred and recovery-oriented mental health services. This has resulted from the expansion of how the concept of recovery is understood in mental health literature and practice. Recovery is now more than a return to function or reduction in symptoms; it is a subjective, individualised and multi-faceted experience. To date there has not been investigation of how recovery-oriented services can be translated and implemented into the primary mental health care system. This paper presents the results of a survey from a prospective cohort of primary care patients with probable depression about the importance of written plans to recover. The benefits of having a written plan to recover from depression, as outlined by the participants, were analysed using Leximancer software. The findings provide insights into how written plans may be an important mechanism for implementing a recovery-oriented primary mental health care system. We conclude that the benefits of a written plan provide insight into how patients conceptualise recovery.

  20. Implementation of Recommendations from the One System Comparative Evaluation of the Hanford Tank Farms and Waste Treatment Plant Safety Bases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garrett, Richard L.; Niemi, Belinda J.; Paik, Ingle K.

    2013-11-07

    A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25more » recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.« less

  1. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  2. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  3. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  4. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  5. The health systems agency: a new bureaucracy.

    PubMed

    Meredith, S; Meredith, G

    1977-07-01

    A Federal law signed by President Ford in 1975 (PL 93-641) mandates the establishment of Health Systems Agencies across the country. The major intent of the law is to provide local direction and control of health care planning. Each Agency shall have a professional staff under the aegis of a board of directors composed of a majority of consumers and a minority of providers. Data identifying health care needs shall be translated into a Health Systems Plan, which is a statement of goals for each Agency; an Annual Implementation Plan shall be developed as a statement of objectives, projects, and strategies requisite to achieving the Health Systems Plan. The concept of the Health Systems Agency has correlate state and federal bureaucratic strata to facilitate health care planning coordination.

  6. Disability Policy Implementation From a Cross-Cultural Perspective.

    PubMed

    Verdugo, Miguel A; Jenaro, Cristina; Calvo, Isabel; Navas, Patricia

    2017-07-01

    Implementation of disability policy is influenced by social, political, and cultural factors. Based on published work, this article discusses four guidelines considered critical for successful policy implementation from a cross-cultural perspective. These guidelines are to: (a) base policy implementation on a contextual analysis, (b) employ a value-based approach, (c) align the service delivery system both vertically and horizontally, and (d) engage in a partnership in policy implementation. Public policy should be understood from a systems perspective that includes cross-cultural issues, such as how different stakeholders are acting and the way they plan and implement policy.

  7. Section summary: Institutional context, drivers and detectability in REDD+ implementation

    Treesearch

    Patricia Manley

    2013-01-01

    REDD+ and Forest DegradationREDD+ implementation requires two key steps: (1) establish a reference emission level or reference level (RL); and (2) monitor performance against the reference level (RL). A monitoring system must be able to monitor the performance of implementing action plans to reduce emissions....

  8. Student Support that Works: A Solid Approach.

    ERIC Educational Resources Information Center

    Lang, Kathy J.; Bielejeski, Ruth

    The College of Saint Benedict and Saint John's University (Minnesota), two coordinate, liberal arts colleges, have implemented a cost-effective student information technology (IT) support system. Project IMPACT (Implementing Academic Technology), a 5-year, $10 million plan to upgrade the technology for student and faculty use, was implemented in…

  9. Computer Security: Governmentwide Planning Process Had Limited Impact. Report to the Chairman, Committee on Science, Space, and Technology, House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Information Management and Technology Div.

    As required by the Computer Security Act of 1987, federal agencies have to identify systems that contain sensitive information and develop plans to safeguard them. The planning process was assessed in 10 civilian agencies as well as the extent to which they had implemented planning controls described in 22 selected plans. The National Institute of…

  10. Fitting Community Based Newborn Care Package into the health systems of Nepal.

    PubMed

    Pradhan, Y V; Upreti, S R; Kc, N P; Thapa, K; Shrestha, P R; Shedain, P R; Dhakwa, J R; Aryal, D R; Aryal, S; Paudel, D C; Paudel, D; Khanal, S; Bhandari, A; Kc, A

    2011-10-01

    Community-based strategies for delivering effective newborn interventions are an essential step to avert newborn death, in settings where the health facilities are unable to effectively deliver the interventions and reach their population. Effective implementation of community-based interventions as a large scale program and within the existing health system depends on the appropriate design and planning, monitoring and support systems. This article provides an overview of implementation design of Community-Based Newborn Care Package (CB-NCP) program, its setup within the health system, and early results of the implementation from one of the pilot districts. The evaluation of CB-NCP in one of the pilot districts shows significant improvement in antenatal, intrapartum and post natal care. The implementation design of the CB-NCP has six different health system management functions: i) district planning and orientation, ii) training/human resource development, iii) monitoring and evaluation, iv) logistics and supply chain management, v) communication strategy, and vi) pay for performance. The CB-NCP program embraced the existing system of monitoring with some additional components for the pilot phase to test implementation feasibility, and aligns with existing safe motherhood and child health programs. Though CB-NCP interventions are proven independently in different local and global contexts, they are piloted in 10 districts as a "package" within the national health system settings of Nepal.

  11. Building Bridges: A Comprehensive System for Healthy Development and School Readiness. Building State Early Childhood Comprehensive Systems Series, Number 1

    ERIC Educational Resources Information Center

    Halfon, Neal; Uyeda, Kimberly; Inkelas, Moira; Rice, Thomas

    2004-01-01

    This report is designed to support the planning and implementation of the Maternal and Child Health Bureau (MCHB) State Early Childhood Comprehensive Systems (SECCS) Initiative. It addresses a set of principles that these agencies can use to advance their planning process, reach out to new partners, develop collaborative strategies, and build a…

  12. Quality assurance of HDR prostate plans: program implementation at a community hospital.

    PubMed

    Rush, Jennifer B; Thomas, Michael D

    2005-01-01

    Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.

  13. When the bells toll: engaging healthcare providers in catastrophic disaster response planning.

    PubMed

    Hanfling, Dan

    2013-01-01

    Catastrophic disaster planning and response have been impeded by the inability to better coordinate the many components of the emergency response system. Healthcare providers in particular have remained on the periphery of such planning because of a variety of real or perceived barriers. Although hospitals and healthcare systems have worked successfully to develop surge capacity and capability, less successful have been the attempts to inculcate such planning in the private practice medical community. Implementation of a systems approach to catastrophic disaster planning that incorporates healthcare provider participation and engagement as one of the first steps toward such efforts will be of significant importance in ensuring that a comprehensive and successful emergency response will ensue.

  14. Creating a future worth experiencing: nursing strategic planning in an integrated healthcare delivery system.

    PubMed

    Drenkard, K N

    2001-01-01

    The application of a strategic planning methodology for the discipline of nursing is described in use by a large, nonprofit integrated healthcare system. The methodology uses a transformational leadership assessment tool, quality planning methods, and large group intervention to engage nurses in the implementation of strategies. Based on systems theory, the methodology outlined by the author has application at any level in an organization, from an entire delivery network, to a patient care unit. The author discusses getting started on a strategic planning journey, tools that are useful in the process, integrating already existing business plans into the strategies for nursing, preliminary measures to monitor progress, and lessons learned along the journey.

  15. Defense Health Agency and the Deployment of the Electronic Health Record: Building an Organizational Framework for Implementation and Sustainment

    DTIC Science & Technology

    2016-12-01

    vital component of hospital and information system management within a healthcare system, but it may be minimally realized by healthcare systems...both government and non-government hospital systems to address them in their strategic and operational plans. Nonetheless, EHR systems are a very... strategic imperatives. Trkman (2010) suggested in the Journal of Information Management , “Implementing change within an organization is dependent

  16. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

  17. Farmers knew prosperity lies in family planning: Prof. Gao Yuanxiang.

    PubMed

    1997-09-01

    This brief article summarizes a speech given by the Director of Population Studies in Hebei, China, on family planning and sustainable development. Concurrent with the implementation of the family planning policy over the past 20 years was the implementation of development policies in rural areas. Agricultural policy shifted from support of the commune system to a land-leasing system. The land-leasing system is an improvement that inspires farmers to become wealthy and modernized. The new rural administration encourages modernization that releases manpower, and thus, frees farmers to concentrate on improving production and farming techniques rather than on increasing reproduction. Farmers decide on working time allocation and investment. Surplus agricultural laborers are migrating to cities in search of better work opportunities. Legal measures are needed to help migrants adapt to development. Urban living requires a one-child policy, while a two-child policy is acceptable in poor and mountainous rural areas. "The education of family planning must be mandatory." Under the new policies, people must become committed to family planning. Farmers are beginning to discover the benefits of family planning. Farmer's enlightenment occurred as a result of the family planning and poverty alleviation efforts during the late 1980s and 1990s. Farmers appreciate the government assistance and now believe that family planning benefits individuals and enhances their honor and responsibility. The benefits of the policy will continue into the future. "Sustainable population development is an important part of economic development." China is entering the new century with a new type of demographic structure, a new cultural system of family planning, and practical efforts.

  18. An ERP Implementation and Business Process Reengineering at a Small University.

    ERIC Educational Resources Information Center

    Yakovlev, Ilya V.

    2002-01-01

    Describes the reengineering of business practices that took place at the University of Wisconsin-Superior when they implemented an enterprise resource planning (ERP) system, PeopleSoft Student Administration (SA). Discusses lessons learned. (EV)

  19. 78 FR 5794 - Occidental Chemical Corporation v. Midwest Independent Transmission System Operator, Inc.; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ..., violates the Public Utility Regulatory Policies Act of 1978 (PURPA) and the Commission's implementing... rights under PURPA and FERC's implementing regulations and find that the MISO QF Integration Plan is...

  20. Research and Development Program Plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Barhen, J.; Hamel, W.R.

    1987-01-01

    A general framework is provided for more detailed planning on an annual basis, both for DOE and for other sponsoring organizations. The charter for the overall intelligent machine research effort is presented along with programmatic and technological goals. A research implementation plan is provided through the FY 1989 horizon.

  1. Role of public involvement in the limits of acceptable change wilderness planning system

    Treesearch

    Edwin E. Krumpe; Stephen F. McCool

    1997-01-01

    Implementation of the LAC within politicized contexts requires that managers/planners involve the public in ways significantly different from the traditional rational-comprehensive paradigm of natural resource planning. In politicized contexts, the lack of clear agreement about goals and disagreement among scientists about cause-effect relationships requires planning...

  2. Using ERP and WfM Systems for Implementing Business Processes: An Empirical Study

    NASA Astrophysics Data System (ADS)

    Aversano, Lerina; Tortorella, Maria

    Software systems mainly considered from enterprises for dealing with a business process automation belong to the following two categories: Workflow Management Systems (WfMS) and Enterprise Resource Planning (ERP) systems. The wider diffusion of ERP systems tends to favourite this solution, but there are several limitations of most ERP systems for automating business processes. This paper reports an empirical study aiming at comparing the ability of implementing business processes of ERP systems and WfMSs. Two different case studies have been considered in the empirical study. It evaluates and analyses the correctness and completeness of the process models implemented by using ERP and WfM systems.

  3. Advance care planning for nursing home residents with dementia: Influence of 'we DECide' on policy and practice.

    PubMed

    Ampe, Sophie; Sevenants, Aline; Smets, Tinne; Declercq, Anja; Van Audenhove, Chantal

    2017-01-01

    (1) To pilot 'we DECide' in terms of influence on advance care planning policy and practice in nursing home dementia care units. (2) To investigate barriers and facilitators for implementing 'we DECide'. This was a pre-test-post-test study in 18 nursing homes. Measurements included: compliance with best practice of advance care planning policy (ACP-audit); advance care planning practice (ACP criteria: degree to which advance care planning was discussed, and OPTION scale: degree of involvement of residents and families in conversations). Advance care planning policy was significantly more compliant with best practice after 'we DECide'; policy in the control group was not. Advance care planning was not discussed more frequently, nor were residents and families involved to a higher degree in conversations after 'we DECide'. Barriers to realizing advance care planning included staff's limited responsibilities; facilitators included support by management staff, and involvement of the whole organization. 'We DECide' had a positive influence on advance care planning policy. Daily practice, however, did not change. Future studies should pay more attention to long-term implementation strategies. Long-term implementation of advance care planning requires involvement of the whole organization and a continuing support system for health care professionals. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  4. Research on Evaluation of Conservation Planning Implementation of Nanshe Historic Village in Dongguan City

    NASA Astrophysics Data System (ADS)

    Yubin, Luo

    2017-10-01

    Conservation planning plays an important role in the protection and development of historic villages. The evaluation of conservation planning is helpful to find out the problems existing in the village protection work which helps to improve the conservation planning system. The paper briefly summarizes the conservation planning background of Nanshe historic village in Dongguan city, Guangdong province, China. The conservation planning guided the protection work of Nanshe village since 2002. It evaluates four aspects of the conservation planning implementation and effect such as protection and utilization of the ancient buildings, roadway repair, landscape and basic sanitation facilities improvement by ways of field research and questionnaire survey. There are only nineteen ancient buildings repaired and the rest of them are part of repaired or not repaired. Most of the roadways are well preserved. Only four of them are partly repaired or not repaired. Most of the villagers like to chat under the ancient banyan trees. Conservation Planning pays not much attention to the needs of the residents. Although conservation planning of Nanshe village developed the near, middle and long term target it actually took 14 years to carry out the near target. It enhances the social awareness of Nanshe village and the sense of belongings of the villagers. Most of the villagers are satisfied with the implementation of the conservation planning. Meanwhile, the paper exposes the conservation planning is too idealistic. It lacks of implementation details and the three phases of the investment funds and pays not much attention to the needs of residents.

  5. Entrepreneurial Spirit in Strategic Planning.

    ERIC Educational Resources Information Center

    Riggs, Donald E.

    1987-01-01

    Presents a model which merges the concepts of entrepreneurship with those of strategic planning to create a library management system. Each step of the process, including needs assessment and policy formation, strategy choice and implementation, and evaluation, is described in detail. (CLB)

  6. Planning and implementing total laboratory automation at the North Shore-Long Island Jewish Health System Laboratories.

    PubMed

    Seaberg, R C; Statland, B E; Stallone, R O

    1999-06-01

    Lab automation and consolidation can be a daunting, risky, major reengineering project. Done right, it can mean decreased labor costs and space requirements, increased test volume, and more efficient use of personnel. See how this health system got the job done using a carefully defined, seven-step plan.

  7. Designing a Strategic Plan through an Emerging Knowledge Generation Process: The ATM Experience

    ERIC Educational Resources Information Center

    Zanotti, Francesco

    2012-01-01

    Purpose: The aim of this contribution is to describe a new methodology for designing strategic plans and how it was implemented by ATM, a public transportation agency based in Milan, Italy. Design/methodology/approach: This methodology is founded on a new system theory, called "quantum systemics". It is based on models and metaphors both…

  8. Monitoring the Effective and Efficient Use of Land: The English Approach

    NASA Astrophysics Data System (ADS)

    Ganser, Robin

    In England quantified targets for the reuse of brownfields and of existing buildings place particular requirements on the planning system as part of the overall strategy to make effective use of natural resources. Achieving these targets is not free of obstacles and potential conflicts. Therefore monitoring of policy implementation is a necessity in the planning system.

  9. Development of a Planning and Institutional Research Subsystem at Grambling State University. AIR 1983 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Lundy, Harold W.; Davis, Bobby

    The development and implementation of a planning and institutional research subsystem by Grambling State University (GSU) are described. Three components of the subsystem are as follows: the Grambling Institutional Data System (GRIDS), simulation and forecasting models, and the management reporting system. The way that GSU has improved the…

  10. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    ERIC Educational Resources Information Center

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  11. A Pilot Study of the Social and Educational Impact of School Desegregation.

    ERIC Educational Resources Information Center

    King, Charles E.; Mayer, Robert R.

    In October 1969, the U.S. Supreme Court ruled that all dual school districts must be merged immediately into unified systems. The Southern City School system, N.C., developed a desegregation plan which was considered a model of compliance with constitutional requirements, this plan being implemented with little or no community opposition despite…

  12. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  13. The application of automated operations at the Institutional Processing Center

    NASA Technical Reports Server (NTRS)

    Barr, Thomas H.

    1993-01-01

    The JPL Institutional and Mission Computing Division, Communications, Computing and Network Services Section, with its mission contractor, OAO Corporation, have for some time been applying automation to the operation of JPL's Information Processing Center (IPC). Automation does not come in one easy to use package. Automation for a data processing center is made up of many different software and hardware products supported by trained personnel. The IPC automation effort formally began with console automation, and has since spiraled out to include production scheduling, data entry, report distribution, online reporting, failure reporting and resolution, documentation, library storage, and operator and user education, while requiring the interaction of multi-vendor and locally developed software. To begin the process, automation goals are determined. Then a team including operations personnel is formed to research and evaluate available options. By acquiring knowledge of current products and those in development, taking an active role in industry organizations, and learning of other data center's experiences, a forecast can be developed as to what direction technology is moving. With IPC management's approval, an implementation plan is developed and resources identified to test or implement new systems. As an example, IPC's new automated data entry system was researched by Data Entry, Production Control, and Advance Planning personnel. A proposal was then submitted to management for review. A determination to implement the new system was made and elements/personnel involved with the initial planning performed the implementation. The final steps of the implementation were educating data entry personnel in the areas effected and procedural changes necessary to the successful operation of the new system.

  14. Understanding key factors affecting electronic medical record implementation: a sociotechnical approach.

    PubMed

    Cucciniello, Maria; Lapsley, Irvine; Nasi, Greta; Pagliari, Claudia

    2015-07-17

    Recent health care policies have supported the adoption of Information and Communication Technologies (ICT) but examples of failed ICT projects in this sector have highlighted the need for a greater understanding of the processes used to implement such innovations in complex organizations. This study examined the interaction of sociological and technological factors in the implementation of an Electronic Medical Record (EMR) system by a major national hospital. It aimed to obtain insights for managers planning such projects in the future and to examine the usefulness of Actor Network Theory (ANT) as a research tool in this context. Case study using documentary analysis, interviews and observations. Qualitative thematic analysis drawing on ANT. Qualitative analyses revealed a complex network of interactions between organizational stakeholders and technology that helped to shape the system and influence its acceptance and adoption. The EMR clearly emerged as a central 'actor' within this network. The results illustrate how important it is to plan innovative and complex information systems with reference to (i) the expressed needs and involvement of different actors, starting from the initial introductory phase; (ii) promoting commitment to the system and adopting a participative approach; (iii) defining and resourcing new roles within the organization capable of supporting and sustaining the change and (iv) assessing system impacts in order to mobilize the network around a common goal. The paper highlights the organizational, cultural, technological, and financial considerations that should be taken into account when planning strategies for the implementation of EMR systems in hospital settings. It also demonstrates how ANT may be usefully deployed in evaluating such projects.

  15. A dynamic case-based planning system for space station application

    NASA Technical Reports Server (NTRS)

    Oppacher, F.; Deugo, D.

    1988-01-01

    We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

  16. Results Accountability for a State Early Childhood Comprehensive System: A Planning Guide for Improving the Well Being of Young Children and Their Families. Building State Early Childhood Comprehensive Systems Series. Number 4

    ERIC Educational Resources Information Center

    Friedman, Mark

    2004-01-01

    The federal Maternal and Child Health Bureau has launched a five-year initiative that will support state efforts to build comprehensive early childhood service systems. This initiative--the State Early Childhood Comprehensive Systems Initiative (SECCS)--provides two year planning grants followed by three year implementation grants to the 50 state…

  17. Productivity Measurement and Analysis of Airborne Weapons Maintenance Plans Performed by the Weapons Support Directorate, Pacific Missile Test Center, Pt. Mugu.

    DTIC Science & Technology

    1987-12-01

    FM__KWJW~j’JVx W-V WWv Wu M WV b7’ II. LIT’rIEK REVI, AND TD .ORZTICAL F MW A. WHAT IS PRODUCTIVITY? 1. Productivity Definod The definition of...Implementing the Manpower Budget And Workgd Forecasting System The implementation of the system designed in Step 9. Step 12 - Implement ihQ inaAn MtpQx

  18. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Implementation plan and implementation... Capacity Reduction Framework § 600.1008 Implementation plan and implementation regulations. (a) As soon as... period, a proposed implementation plan and implementation regulations. During the public comment period...

  19. Why revisit your cost-accounting strategy.

    PubMed

    Arredondo, Ricky

    2014-07-01

    Healthcare entities seeking to develop effective cost-accounting systems should take six steps to avoid potential pitfalls: Secure broad executive-level support for the effort. Ensure systems are in place to analyze the disparate data. Define measurable objectives to ensure that implementation achieves desired results. Give due consideration to implementation planning. Train support staff sufficiently to avoid underutilization. Develop a sufficiently broad base of staff support for the system.

  20. Implementation of a Web-Based Collaborative Process Planning System

    NASA Astrophysics Data System (ADS)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  1. Collaboration process for integrated social and health care strategy implementation.

    PubMed

    Korpela, Jukka; Elfvengren, Kalle; Kaarna, Tanja; Tepponen, Merja; Tuominen, Markku

    2012-01-01

    To present a collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS). A case study done in the South Karelia District of Social and Health Services in Finland during 2010-2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study. As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed. The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.

  2. YUCSA: A CLIPS expert database system to monitor academic performance

    NASA Technical Reports Server (NTRS)

    Toptsis, Anestis A.; Ho, Frankie; Leindekar, Milton; Foon, Debra Low; Carbonaro, Mike

    1991-01-01

    The York University CLIPS Student Administrator (YUCSA), an expert database system implemented in C Language Integrated Processing System (CLIPS), for monitoring the academic performance of undergraduate students at York University, is discussed. The expert system component in the system has already been implemented for two major departments, and it is under testing and enhancement for more departments. Also, more elaborate user interfaces are under development. We describe the design and implementation of the system, problems encountered, and immediate future plans. The system has excellent maintainability and it is very efficient, taking less than one minute to complete an assessment of one student.

  3. Ten steps to plan, design, and implement an endocrinology and endocrine surgery module for the Faculty of Medicine, Al-Baha University.

    PubMed

    Elfakey, Walyeldin Em; Al-Ghamdi, Ahmed H

    2016-01-01

    The Faculty of Medicine, Al-Baha University (FMBU), is a newly established medical school that implements a community-oriented and integrated system-based curriculum which is suitable for both medical students and serving the needs of the local community. The aim of this study is to describe the steps that were followed to plan, design, and implement an endocrinology and endocrine surgery module (EESM) for the fourth-year medical students, as an example of how system-based modules are designed at FMBU. Ten questions based on Harden's methodolgy were asked in order to design, plan, and implement an endocrinology and endocrine surgery module. The module committee determined the needs of the module and accordingly stated the aims and objectives of the module. The module planners selected the relevant contents, teaching methods, and assessment strategies and organized them. After addressing each of the ten questions, the results indicated the need, aim, objectives, and contents for the endocrinology and endocrine surgery module at FMBU. The implementation strategies were chosen according to the SPICES model. The teaching methods and the assessment strategies were selected and arranged. The module is well communicated at all levels, and the module committee used every effort to create a productive teaching environment. The module is well managed and follows the hierarchy of FMBU. Implementing Harden's ten steps methodology resulted in an integrated module of endocrinology and endocrine surgery where related disciplines and systems were merged and medical and surgical endocrine topics were included.

  4. Traffic control systems handbook.

    DOT National Transportation Integrated Search

    2005-10-01

    The Traffic Control Systems Handbook updates the 1996 edition (FHWA-SA-96-032). It serves as a basic reference in planning, designing and implementing traffic control systems. : Specific chapters include introduction, summary of available and emergin...

  5. Traffic control systems handbook

    DOT National Transportation Integrated Search

    2005-10-01

    The 2005 edition of "Traffic Control Systems Handbook" updates the 1996 edition (FHWA-SA-96-032). It serves as a basic reference in planning, designing and implementing traffic control systems. Specific chapters include introduction, summary of avail...

  6. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.

    1987-01-01

    The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  7. A Mode of Combined ERP and KMS Knowledge Management System Construction

    NASA Astrophysics Data System (ADS)

    Yuena, Kang; Yangeng, Wen; Qun, Zhou

    The core of ERP and knowledge management is quite similar; both will send appropriate knowledge (goods, funds) to the right people (position) at the right time. It is reasonable to believe that increase the knowledge management system in ERP will help companies achieve their goals better. This paper compares the concept of logical point of hall three-dimensional structure of the knowledge management system and the ERP in methodology level. And found they are very similar in the time dimension, logic dimension and knowledge dimension. This laid the basis of methodology in the simultaneous planning, implementation and applications. And then proposed a knowledge-based ERP Multi-Agent Management System Model. Finally, the paper described the process from planning to implementation of knowledge management ERP system with multi-Agent interaction and impact from three concepts, management thinking, software and system.

  8. Implementation of a software for REmote COMparison of PARticlE and photon treatment plans: ReCompare.

    PubMed

    Löck, Steffen; Roth, Klaus; Skripcak, Tomas; Worbs, Mario; Helmbrecht, Stephan; Jakobi, Annika; Just, Uwe; Krause, Mechthild; Baumann, Michael; Enghardt, Wolfgang; Lühr, Armin

    2015-09-01

    To guarantee equal access to optimal radiotherapy, a concept of patient assignment to photon or particle radiotherapy using remote treatment plan exchange and comparison - ReCompare - was proposed. We demonstrate the implementation of this concept and present its clinical applicability. The ReCompare concept was implemented using a client-server based software solution. A clinical workflow for the remote treatment plan exchange and comparison was defined. The steps required by the user and performed by the software for a complete plan transfer were described and an additional module for dose-response modeling was added. The ReCompare software was successfully tested in cooperation with three external partner clinics and worked meeting all required specifications. It was compatible with several standard treatment planning systems, ensured patient data protection, and integrated in the clinical workflow. The ReCompare software can be applied to support non-particle radiotherapy institutions with the patient-specific treatment decision on the optimal irradiation modality by remote treatment plan exchange and comparison. Copyright © 2015. Published by Elsevier GmbH.

  9. Decision Support Systems for Research and Management in Advanced Life Support

    NASA Technical Reports Server (NTRS)

    Rodriquez, Luis F.

    2004-01-01

    Decision support systems have been implemented in many applications including strategic planning for battlefield scenarios, corporate decision making for business planning, production planning and control systems, and recommendation generators like those on Amazon.com(Registered TradeMark). Such tools are reviewed for developing a similar tool for NASA's ALS Program. DSS are considered concurrently with the development of the OPIS system, a database designed for chronicling of research and development in ALS. By utilizing the OPIS database, it is anticipated that decision support can be provided to increase the quality of decisions by ALS managers and researchers.

  10. Scheduling Future Water Supply Investments Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2014-12-01

    Uncertain hydrological impacts of climate change, population growth and institutional changes pose a major challenge to planning of water supply systems. Planners seek optimal portfolios of supply and demand management schemes but also when to activate assets whilst considering many system goals and plausible futures. Incorporation of scheduling into the planning under uncertainty problem strongly increases its complexity. We investigate some approaches to scheduling with many-objective heuristic search. We apply a multi-scenario many-objective scheduling approach to the Thames River basin water supply system planning problem in the UK. Decisions include which new supply and demand schemes to implement, at what capacity and when. The impact of different system uncertainties on scheme implementation schedules are explored, i.e. how the choice of future scenarios affects the search process and its outcomes. The activation of schemes is influenced by the occurrence of extreme hydrological events in the ensemble of plausible scenarios and other factors. The approach and results are compared with a previous study where only the portfolio problem is addressed (without scheduling).

  11. Implementing a research utilization plan for prevention of deep vein thrombosis.

    PubMed

    Van Wicklin, Sharon A; Ward, Karen S; Cantrell, Shirley W

    2006-06-01

    Ensuring use of best practices is crucially important in today's health care system. Nurses can identify research results that offer promising new treatment options for their patients and should have a plan for implementing research findings. The perioperative education coordinator at one facility identified the occurrence of deep vein thrombosis as a significant problem. She conducted a literature review, created an education program for nurses, and implemented an evidence-based practice change. This article describes the steps in this process. Now, patients at the facility consistently are assessed for deep vein thrombosis and receive appropriate preventive treatment.

  12. Evaluation of complete streets policy implementation by metropolitan planning organizations.

    DOT National Transportation Integrated Search

    2015-09-01

    Over the last ten years, communities around the country have begun to implement comprehensive reforms : designed to ensure that roadway users of all ages and abilities can safely utilize the transportation system. : This complete streets policy frame...

  13. Safer Systems: A NextGen Aviation Safety Strategic Goal

    NASA Technical Reports Server (NTRS)

    Darr, Stephen T.; Ricks, Wendell R.; Lemos, Katherine A.

    2008-01-01

    The Joint Planning and Development Office (JPDO), is charged by Congress with developing the concepts and plans for the Next Generation Air Transportation System (NextGen). The National Aviation Safety Strategic Plan (NASSP), developed by the Safety Working Group of the JPDO, focuses on establishing the goals, objectives, and strategies needed to realize the safety objectives of the NextGen Integrated Plan. The three goal areas of the NASSP are Safer Practices, Safer Systems, and Safer Worldwide. Safer Practices emphasizes an integrated, systematic approach to safety risk management through implementation of formalized Safety Management Systems (SMS) that incorporate safety data analysis processes, and the enhancement of methods for ensuring safety is an inherent characteristic of NextGen. Safer Systems emphasizes implementation of safety-enhancing technologies, which will improve safety for human-centered interfaces and enhance the safety of airborne and ground-based systems. Safer Worldwide encourages coordinating the adoption of the safer practices and safer systems technologies, policies and procedures worldwide, such that the maximum level of safety is achieved across air transportation system boundaries. This paper introduces the NASSP and its development, and focuses on the Safer Systems elements of the NASSP, which incorporates three objectives for NextGen systems: 1) provide risk reducing system interfaces, 2) provide safety enhancements for airborne systems, and 3) provide safety enhancements for ground-based systems. The goal of this paper is to expose avionics and air traffic management system developers to NASSP objectives and Safer Systems strategies.

  14. Analyzing the Implementation of an ERP System by Self-Assessment in Higher Education

    ERIC Educational Resources Information Center

    Máté, Domicián; Bács, Zoltán; Takács, Viktor László

    2017-01-01

    Over the last few decades, not only organizations but also Higher Education Institutions should be more responsive to the demands of the changed global business environment and improve their effectiveness. Our motivation to write this paper is to assess the implementation of an Enterprise Resource Planning (ERP) system in higher education and…

  15. An ERP Post-Implementation Review: Planning for the Future by Looking Back

    ERIC Educational Resources Information Center

    Powel, Wayne D.; Barry, Jim

    2005-01-01

    In 1995, Gonzaga University embarked on a project to implement a university-wide information system. The search for an "out-of-the-box" solution began following an attempt to build an integrated data management system in-house. In 1994, Gonzaga decided to look at commercial solutions to its database management problems. With the blessing…

  16. Children's hospitals and PACS: six profiles of planning and implementation.

    PubMed

    Keen, C

    1999-01-01

    Six pediatric hospitals were interviewed at length about the status of PACS in their facilities. Children's Hospital Medical Center in Cincinnati, Ohio entered electronic imaging communications in 1993. Several nearby clinics were connected through teleradiology and by 1998, the radiology department had developed a business plan for the implementation of PACS. Two hospitals in Atlanta, Egleston Hospital and Scottish Rite Children's. Medical Center, merged in 1998 to become one entity with two medical campuses. They now treat 60 percent of Atlanta's pediatric patients. Merging incompatible systems has been the administrator's most immediate problem. One director of imaging services is responsible for the recently merged Mary Bridge Children's Hospital and Tacoma General Hospital, plus a network of clinics and medical facilities scatted throughout Tacoma and the South Puget Sound area in Washington state. A state-of-the-art mini-PACS and teleradiology system were implemented at Primary Children's Medical Center, Salt Lake City, in 1991. Over the years, it has added modalities into an electronic system that now results in significantly improved use of physicians' time and patient relations. St. Louis Children's Hospital, with both a director of radiology and a PACS administrator, has implemented teleradiology and an ultrasound mini-PACS, and has plans for an enterprise-wide PACS. Children's Hospital in Birmingham, Ala., a major trauma center, provides specialized pediatric care to nearly all 67 counties in Alabama. With a 20-year history of online computerization, it is now reengineering its emergency department and will implement CR there first.

  17. Contraceptive security, information flow, and local adaptations: family planning Morocco.

    PubMed

    Chandani, Y; Breton, G

    2001-12-01

    Many developing countries increasingly recognize and acknowledge family planning as a critical part of socio-economic development. However, with few health dollars to go around, countries tend to provide essential drugs for curative care, rather than for family planning products. Donors have historically provided free contraceptives for family planning services. Whether products are donated or purchased by the country, a successful family planning program depends on an uninterrupted supply of products, beginning with the manufacturer and ending with the customer. Any break in the supply chain may cause a family planning program to fail. A well-functioning logistics system can manage the supply chain and ensure that the customers have the products they need, when they need them. Morocco was selected for the case study. The researchers had ready access to key informants and information about the Logistics Management Information System. Because the study had time and resource constraints, research included desktop reviews and interview, rather than data collection in the field. The case study showed that even in a challenging environment an LMIS can be successfully deployed and fully supported by the users. It is critical to customize the system to a country-specific situation to ensure buy-in for the implementation. Significant external support funding and technical expertise are critical components to ensure the initial success of the system. Nonetheless, evidence from the case study shows that, after a system has been implemented, the benefits may not ensure its institutionalization. Other support, including local funding and technical expertise, is required.

  18. Responsibility Center Management: An Assessment of RCM at IUPUI.

    ERIC Educational Resources Information Center

    Robbins, David L.; Rooney, Patrick Michael

    1995-01-01

    Indiana University-Purdue University at Indianapolis is the first public institution to implement Responsibility Center Management (RCM), a comprehensive decentralized, incentive-base financial management system. RCM has strengthened academic planning, budget management, general accountability, and multiyear fiscal planning. Organizational…

  19. Acadia National Park ITS field operational test : evaluation plan

    DOT National Transportation Integrated Search

    2000-08-01

    This document presents the plan for evaluating technologies known as Intelligent Transportation Systems (ITS) that will be implemented in Acadia National Park and Mount Desert Island, Maine. Acadia National Park was selected as a site for an ITS Fiel...

  20. An Operational Model for the Application of Planning-Programming-Budgeting Systems to Local School Districts. Post-Pilot-Test Version. Parts One and Two.

    ERIC Educational Resources Information Center

    Kiser, Chester; And Others

    This 2-part document is designed to aid school districts in the implementation of a planning programing budgeting system. The first part of the manual contains (1) statements of policy, (2) a master flowchart, (3) organization and functions of a PPBS system, (4) a flowscript of procedures, (5) job outlines, and (6) supplementary appendix material.…

  1. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  2. Probabilistic objective functions for margin-less IMRT planning

    NASA Astrophysics Data System (ADS)

    Bohoslavsky, Román; Witte, Marnix G.; Janssen, Tomas M.; van Herk, Marcel

    2013-06-01

    We present a method to implement probabilistic treatment planning of intensity-modulated radiation therapy using custom software plugins in a commercial treatment planning system. Our method avoids the definition of safety-margins by directly including the effect of geometrical uncertainties during optimization when objective functions are evaluated. Because the shape of the resulting dose distribution implicitly defines the robustness of the plan, the optimizer has much more flexibility than with a margin-based approach. We expect that this added flexibility helps to automatically strike a better balance between target coverage and dose reduction for surrounding healthy tissue, especially for cases where the planning target volume overlaps organs at risk. Prostate cancer treatment planning was chosen to develop our method, including a novel technique to include rotational uncertainties. Based on population statistics, translations and rotations are simulated independently following a marker-based IGRT correction strategy. The effects of random and systematic errors are incorporated by first blurring and then shifting the dose distribution with respect to the clinical target volume. For simplicity and efficiency, dose-shift invariance and a rigid-body approximation are assumed. Three prostate cases were replanned using our probabilistic objective functions. To compare clinical and probabilistic plans, an evaluation tool was used that explicitly incorporates geometric uncertainties using Monte-Carlo methods. The new plans achieved similar or better dose distributions than the original clinical plans in terms of expected target coverage and rectum wall sparing. Plan optimization times were only about a factor of two higher than in the original clinical system. In conclusion, we have developed a practical planning tool that enables margin-less probability-based treatment planning with acceptable planning times, achieving the first system that is feasible for clinical implementation.

  3. Treatment Planning and Image Guidance for Radiofrequency Ablations of Large Tumors

    PubMed Central

    Ren, Hongliang; Campos-Nanez, Enrique; Yaniv, Ziv; Banovac, Filip; Abeledo, Hernan; Hata, Nobuhiko; Cleary, Kevin

    2014-01-01

    This article addresses the two key challenges in computer-assisted percutaneous tumor ablation: planning multiple overlapping ablations for large tumors while avoiding critical structures, and executing the prescribed plan. Towards semi-automatic treatment planning for image-guided surgical interventions, we develop a systematic approach to the needle-based ablation placement task, ranging from pre-operative planning algorithms to an intra-operative execution platform. The planning system incorporates clinical constraints on ablations and trajectories using a multiple objective optimization formulation, which consists of optimal path selection and ablation coverage optimization based on integer programming. The system implementation is presented and validated in phantom studies and on an animal model. The presented system can potentially be further extended for other ablation techniques such as cryotherapy. PMID:24235279

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tanny, S; Bogue, J; Parsai, E

    Purpose: Potential collisions between the gantry head and the patient or table assembly are difficult to detect in most treatment planning systems. We have developed and implemented a novel software package for the representation of potential gantry collisions with the couch assembly at the time of treatment planning. Methods: Physical dimensions of the Varian Edge linear accelerator treatment head were measured and reproduced using the Visual Python display package. A script was developed for the Pinnacle treatment planning system to generate a file with the relevant couch, gantry, and isocenter positions for each beam in a planning trial. A pythonmore » program was developed to parse the information from the TPS and produce a representative model of the couch/gantry system. Using the model and the Visual Python libraries, a rendering window is generated for each beam that allows the planner to evaluate the possibility of a collision. Results: Comparison against heuristic methods and direct verification on the machine validated the collision model generated by the software. Encounters of <1 cm between the gantry treatment head and table were visualized as collisions in our virtual model. Visual windows were created depicting the angle of collision for each beam, including the anticipated table coordinates. Visual rendering of a 6 arc trial with multiple couch positions was completed in under 1 minute, with network bandwidth being the primary bottleneck. Conclusion: The developed software allows for quick examination of possible collisions during the treatment planning process and helps to prevent major collisions prior to plan approval. The software can easily be implemented on future planning systems due to the versatility and platform independence of the Python programming language. Further integration of the software with the treatment planning system will allow the possibility of patient-gantry collision detection for a range of treatment machines.« less

  5. DOD Business Systems Modernization: Additional Enhancements Are Needed for Army Business System Schedule and Cost Estimates to Fully Meet Best Practices

    DTIC Science & Technology

    2014-09-01

    dollars annually to develop and implement enterprise resource planning ( ERP ) systems, which it considers critical to transforming the department’s...modernization.1 DOD officials have stated that the implementation of the ERPs , such as the Global Combat Support System-Army (GCSS-Army), is a key...1An ERP system is an automated system using commercial off-the-shelf software consisting of multiple, integrated functional modules that perform

  6. The Roles of System and Organizational Leadership in System-Wide Evidence-Based Intervention Sustainment: A Mixed-Method Study.

    PubMed

    Aarons, Gregory A; Green, Amy E; Trott, Elise; Willging, Cathleen E; Torres, Elisa M; Ehrhart, Mark G; Roesch, Scott C

    2016-11-01

    If evidence-based interventions (EBIs) are not sustained, investments are wasted and public health impact is limited. Leadership has been suggested as a key determinant of implementation and sustainment; however, little empirical work has examined this factor. This mixed-methods study framed using the Exploration, Preparation, Implementation, Sustainment (EPIS) conceptual framework examines leadership in both the outer service system context and inner organizational context in eleven system-wide implementations of the same EBI across two U.S. states and 87 counties. Quantitative data at the outer context (i.e., system) and inner context (i.e., team) levels demonstrated that leadership predicted future sustainment and differentiated between sites with full, partial, or no sustainment. In the outer context positive sustainment leadership was characterized as establishing a project's mission and vision, early and continued planning for sustainment, realistic project plans, and having alternative strategies for project survival. Inner context frontline transformational leadership predicted sustainment while passive-avoidant leadership predicted non-sustainment. Qualitative results found that sustainment was associated with outer context leadership characterized by engagement in ongoing supportive EBI championing, marketing to stakeholders; persevering in these activities; taking action to institutionalize the EBI with funding, contracting, and system improvement plans; and fostering ongoing collaboration between stakeholders at state and county, and community stakeholder levels. For frontline leadership the most important activities included championing the EBI and providing practical support for service providers. There was both convergence and expansion that identified unique contributions of the quantitative and qualitative methods. Greater attention to leadership in both the outer system and inner organizational contexts is warranted to enhance EBI implementation and sustainment.

  7. The Roles of System and Organizational Leadership in System-Wide Evidence-Based Intervention Sustainment: A Mixed-Method Study

    PubMed Central

    Aarons, Gregory A.; Green, Amy E.; Trott, Elise; Willging, Cathleen E.; Torres, Elisa M.; Ehrhart, Mark G.; Roesch, Scott C.

    2017-01-01

    If evidence-based interventions (EBIs) are not sustained, investments are wasted and public health impact is limited. Leadership has been suggested as a key determinant of implementation and sustainment; however, little empirical work has examined this factor. This mixed-methods study framed using the Exploration, Preparation, Implementation, Sustainment (EPIS) conceptual framework examines leadership in both the outer service system context and inner organizational context in eleven system-wide implementations of the same EBI across two U.S. states and 87 counties. Quantitative data at the outer context (i.e., system) and inner context (i.e., team) levels demonstrated that leadership predicted future sustainment and differentiated between sites with full, partial, or no sustainment. In the outer context positive sustainment leadership was characterized as establishing a project’s mission and vision, early and continued planning for sustainment, realistic project plans, and having alternative strategies for project survival. Inner context frontline transformational leadership predicted sustainment while passive-avoidant leadership predicted non-sustainment. Qualitative results found that sustainment was associated with outer context leadership characterized by engagement in ongoing supportive EBI championing, marketing to stakeholders; persevering in these activities; taking action to institutionalize the EBI with funding, contracting, and system improvement plans; and fostering ongoing collaboration between stakeholders at state and county, and community stakeholder levels. For frontline leadership the most important activities included championing the EBI and providing practical support for service providers. There was both convergence and expansion that identified unique contributions of the quantitative and qualitative methods. Greater attention to leadership in both the outer system and inner organizational contexts is warranted to enhance EBI implementation and sustainment. PMID:27439504

  8. Intelligent transportation systems (ITS) : program and projects

    DOT National Transportation Integrated Search

    1997-07-01

    This is a brief outline of the current projects and programs related to the Intelligent Transportation Systems (ITS) initiatives, formerly known as Intelligent Vehicle Highway Systems (IVHS), being planned, developed, or implemented by the Michigan D...

  9. Designing automatic resupply systems.

    PubMed

    Harding, M L

    1999-02-01

    This article outlines the process for designing and implementing autoresupply systems. The planning process includes determination of goals and appropriate participation. Different types of autoresupply mechanisms include kanban, breadman, consignment, systems contracts, and direct shipping from an MRP schedule.

  10. 3D treatment planning systems.

    PubMed

    Saw, Cheng B; Li, Sicong

    2018-01-01

    Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  11. Implementation of Policy, Systems, and Environmental Community-Based Interventions for Cardiovascular Health Through a National Not-for-Profit: A Multiple Case Study.

    PubMed

    Garney, Whitney R; Szucs, Leigh E; Primm, Kristin; King Hahn, Laura; Garcia, Kristen M; Martin, Emily; McLeroy, Kenneth

    2018-05-01

    In 2014, the Centers for Disease Control and Prevention funded the American Heart Association to implement policy, systems, and environment-focused strategies targeting access to healthy food and beverages, physical activity, and smoke-free environments. To understand factors affecting implementation and variations in success across sites, evaluators conducted a multiple case study. Based on past literature, community sites were categorized as capacity-building or implementation-ready, for comparison. A sample of six communities were selected using a systematic selection tool. Through site visits, evaluators conducted interviews with program staff and community partners and assessed action plans. Evaluators identified important implications for nationally coordinated community-based prevention programming. Differences in implementation varied by the communities' readiness, with the most notable differences in how they planned activities and defined success. Existing partner relationships (or lack thereof) played a significant role, regardless of the American Heart Association's existing presence within the communities, in the progression of initiatives and the differences observed among phases. Last, goals in capacity-building sites were tied to organizational goals while goals in implementation-ready sites were more incremental with increased community influence and buy-in. Using national organizations as a mechanism to carry out large-scale community-based prevention work is a viable option that provides coordinated, wide-scale implementation without sacrificing a community's priorities or input. In funding future initiatives, the presence of relationships and the time needed to cultivate such relationships should be accounted for in the planning and implementation processes, as well as both local and national expectations.

  12. Conceptual Problems.

    ERIC Educational Resources Information Center

    Foley, Walter J.

    A systems theory approach to information requirements in education and in evaluation strategies is applied to decision making. Educational decision making itself involves long range planning, system structuring to implement goals, system allocation (cost), and system monitoring which provides the feedback. Each level requires differential…

  13. Using neural networks and Dyna algorithm for integrated planning, reacting and learning in systems

    NASA Technical Reports Server (NTRS)

    Lima, Pedro; Beard, Randal

    1992-01-01

    The traditional AI answer to the decision making problem for a robot is planning. However, planning is usually CPU-time consuming, depending on the availability and accuracy of a world model. The Dyna system generally described in earlier work, uses trial and error to learn a world model which is simultaneously used to plan reactions resulting in optimal action sequences. It is an attempt to integrate planning, reactive, and learning systems. The architecture of Dyna is presented. The different blocks are described. There are three main components of the system. The first is the world model used by the robot for internal world representation. The input of the world model is the current state and the action taken in the current state. The output is the corresponding reward and resulting state. The second module in the system is the policy. The policy observes the current state and outputs the action to be executed by the robot. At the beginning of program execution, the policy is stochastic and through learning progressively becomes deterministic. The policy decides upon an action according to the output of an evaluation function, which is the third module of the system. The evaluation function takes the following as input: the current state of the system, the action taken in that state, the resulting state, and a reward generated by the world which is proportional to the current distance from the goal state. Originally, the work proposed was as follows: (1) to implement a simple 2-D world where a 'robot' is navigating around obstacles, to learn the path to a goal, by using lookup tables; (2) to substitute the world model and Q estimate function Q by neural networks; and (3) to apply the algorithm to a more complex world where the use of a neural network would be fully justified. In this paper, the system design and achieved results will be described. First we implement the world model with a neural network and leave Q implemented as a look up table. Next, we use a lookup table for the world model and implement the Q function with a neural net. Time limitations prevented the combination of these two approaches. The final section discusses the results and gives clues for future work.

  14. Data Quality -- A Key to Successfully Implementing ECSS

    DTIC Science & Technology

    2009-03-01

    Inventory inaccuracy and supply chain performance: A simulation study of a retail supply chain. International Journal of Production Economics , 95...Planning (ERP) System Implementations Based on Critical Success Factors (CSFs). International Journal of Production Economics , 98(2), 189- 203. Tersine

  15. Incorporating Implementation of ITS Technologies into Local Planning Processes

    DOT National Transportation Integrated Search

    1998-09-16

    In this paper, the author discusses the barriers to implementing intelligent : transportation systems (ITS) at the local level. Chief among these is the need t : o education the public. At the same time, this educational effort must be : tailored for...

  16. Analysis of Controller-Pilot Voice Communications from Kansas City Air Route Traffic Control Center

    DOT National Transportation Integrated Search

    2017-07-01

    The implementation of Controller Pilot Datalink Communications (CPDLC) in domestic en route airspace is a key enabling technology in the Next Generation Air Transportation System. The Federal Aviation Administration plans to implement en route CPDLC ...

  17. 29 CFR 1952.311 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... standards promulgation March 1974. (c) Implementation of the Management Information System by December 1975. (d) Complete implementation of the occupational health program by July 1975. (e) Complete State plan... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR...

  18. 29 CFR 1952.311 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standards promulgation March 1974. (c) Implementation of the Management Information System by December 1975. (d) Complete implementation of the occupational health program by July 1975. (e) Complete State plan... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR...

  19. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    ERIC Educational Resources Information Center

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  20. The Application of Computer Technology to the Development of a Native American Planning and Information System.

    ERIC Educational Resources Information Center

    McKinley, Kenneth H.; Self, Burl E., Jr.

    A study was conducted to determine the feasibility of using the computer-based Synagraphic Mapping Program (SYMAP) and the Statistical Package for the Social Sciences (SPSS) in formulating an efficient and accurate information system which Creek Nation tribal staff could implement and use in planning for more effective and precise delivery of…

  1. System Engineering and Integration Contract for Implementation of the National Airspace System Plan. Volume 2. Section 5.0 NAS Plan Project Findings.

    DTIC Science & Technology

    1984-08-01

    and FPS-60 -’ vacuum-tube radars. There will be remote control interface units ( RCIU ) for tube-type radars, and an ARSR-3 relocation and RIH package...Facility RCE Remote Control Equipment; Radio Control Equipment RCIU Remote Control Interface Units RCO Remote Communications Outlet RDCC Research

  2. Logistics Force Planner Assistant (Log Planner)

    DTIC Science & Technology

    1989-09-01

    elements. The system is implemented on a MS-DOS based microcomputer, using the "Knowledge Pro’ software tool., 20 DISTRIBUTION/AVAILABILITY OF... service support structure. 3. A microcomputer-based knowledge system was developed and successfully demonstrated. Four modules of information are...combat service support (CSS) units planning process to Army Staff logistics planners. Personnel newly assigned to logistics planning need an

  3. Physician density planning in a public healthcare system: Complexities, threats and opportunities-The case of the Israeli healthcare system.

    PubMed

    Gamzu, Ronni; Kaidar, Nir; Afek, Arnon; Horev, Tuvia

    2016-08-01

    Human-resource planning in healthcare is one of the most significant challenges that healthcare systems worldwide face. Among all healthcare professions, the planning of physician supply is the most complex of all due to physicians' lengthy training and many specialties. Forecasts showing a disturbing downward trend in the ratio of physicians to population in Israel prompted the Israeli Government in 2010 to establish a committee mandated to predict demand for physicians and recommend steps to adjust supply to it. The committee analyzed numerous variables that affect physician supply and demand and recommended measures that in greater part were implemented. The article discusses the methodology of the committee, its recommendations, and their implementation such as a 52% increase in the number of first-year medical students between 2010 and 2012. Its analysis of the current situation shows that the implementation of the recommendations successfully stemmed the decrease in physician density and attained the committee's other long-term objectives: physician density of 2.9 per 1000 of population and an increase (32.5%) in the number of physicians who began training in targeted specialties. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  4. Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

  5. Strategic Planning for Chronic Disease Prevention in Rural America: Looking Through a PRISM Lens.

    PubMed

    Honeycutt, Amanda A; Wile, Kristina; Dove, Cassandra; Hawkins, Jackie; Orenstein, Diane

    2015-01-01

    Community-level strategic planning for chronic disease prevention. To share the outcomes of the strategic planning process used by Mississippi Delta stakeholders to prevent and reduce the negative impacts of chronic disease in their communities. A key component of strategic planning was participants' use of the Prevention Impacts Simulation Model (PRISM) to project the reduction, compared with the status quo, in deaths and costs from implementing interventions in Mississippi Delta communities. Participants in Mississippi Delta strategic planning meetings used PRISM, a user-friendly, evidence-based simulation tool that includes 22 categories of policy, systems, and environmental change interventions, to pose what-if questions that explore the likely short- and long-term effects of an intervention or any desired combination of the 22 categories of chronic disease intervention programs and policies captured in PRISM. These categories address smoking, air pollution, poor nutrition, and lack of physical activity. Strategic planning participants used PRISM outputs to inform their decisions and actions to implement interventions. Rural communities in the Mississippi Delta. A diverse group of 29 to 34 local chronic disease prevention stakeholders, known as the Mississippi Delta Strategic Alliance. Community plans and actions that were developed and implemented as a result of local strategic planning. Existing strategic planning efforts were complemented by the use of PRISM. The Mississippi Delta Strategic Alliance decided to implement new interventions to improve air quality and transportation and to expand existing interventions to reduce tobacco use and increase access to healthy foods. They also collaborated with the Department of Transportation to raise awareness and use of the current transportation network. The Mississippi Delta Strategic Alliance strategic planning process was complemented by the use of PRISM as a tool for strategic planning, which led to the implementation of new and strengthened chronic disease prevention interventions and policies in the Mississippi Delta.

  6. Strategic planning--a plan for excellence for South Haven Health System.

    PubMed

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  7. Public Health Information Systems: Priorities and Practices for Successful Deployments.

    PubMed

    Pearce, Martin

    2016-01-01

    A fast paced workshop designed for senior public health decision makers and clinical leaders implementing information systems to support delivery of public health programs. The tutorial will introduce public health information systems and provide best practices for implementing solutions related to immunization, communicable disease case management and outbreak management. Using a combination of formats, the tutorial will: • Highlight key functionality of public health information systems. • Review global crises currently exposing gaps and deficiencies in public health information. • Examine governance, planning, and implementation priorities. • Highlight considerations supporting implementations nationally and in special populations. • Provide real, actionable lessons learned to take away and apply in the real world.

  8. The flight planning - flight management connection

    NASA Technical Reports Server (NTRS)

    Sorensen, J. A.

    1984-01-01

    Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

  9. Modeling and Simulation Roadmap to Enhance Electrical Energy Security of U.S. Naval Bases

    DTIC Science & Technology

    2012-03-01

    evaluating power system architectures and technologies and, therefore, can become a valuable tool for the implementation of the described plan for Navy...a well validated and consistent process for evaluating power system architectures and technologies and, therefore, can be a valuable tool for the...process for evaluating power system architectures and component technologies is needed to support the development and implementation of these new

  10. Irrigation Training Manual. Planning, Design, Operation, and Management of Small-Scale Irrigation Systems [and] Irrigation Reference Manual. A Technical Reference to Be Used with the Peace Corps Irrigation Training Manual T0076 in the Selection, Planning, Design, Operation, and Management of Small-Scale Irrigation Systems.

    ERIC Educational Resources Information Center

    Salazar, LeRoy; And Others

    This resource for trainers involved in irrigated agriculture training for Peace Corps volunteers consists of two parts: irrigation training manual and irrigation reference manual. The complete course should fully prepare volunteers serving as irrigation, specialists to plan, implement, evaluate and manage small-scale irrigation projects in arid,…

  11. DOT Announces Action Plan for Transportation Infrastructure Relying on GPS

    DOT National Transportation Integrated Search

    2002-03-07

    U.S. Transportation Secretary Norman Y. Mineta today announced that the U.S. Department of : Transportation (DOT) will implement an action plan to maintain the adequacy of backup systems : for each area of operation in which the Global Positioning Sy...

  12. Career Education. Administrators and Counselors Implementation Model. Module IV--Planning. (4.1) Develop Plans for Curriculum Preparation and Infusion.

    ERIC Educational Resources Information Center

    Thompson, John A.; Chock, Mona K.O.

    Part of a 13-volume series designed to be used as a group inservice or a self-learning system to train school administrators and counselors for their role in career education, this first section (4.1) of module 4 (Planning) is designed to assist principals and other school administrators to develop plans for curriculum preparation and infusion of…

  13. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  14. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less

  15. 77 FR 43205 - Notice of Data Availability for Approval, Disapproval and Promulgation of Implementation Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Haze State Implementation Plan; Federal Implementation Plan for Regional Haze AGENCY: Environmental... (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Proposed Rule (77...

  16. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  17. Transportation Institutional Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader'smore » convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.« less

  18. Is health systems integration being advanced through Local Health District planning?

    PubMed

    Saunders, Carla; Carter, David J

    2017-05-01

    Objective Delivering genuine integrated health care is one of three strategic directions in the New South Wales (NSW) Government State Health Plan: Towards 2021. This study investigated the current key health service plan of each NSW Local Health District (LHD) to evaluate the extent and nature of health systems integration strategies that are currently planned. Methods A scoping review was conducted to identify common key principles and practices for successful health systems integration to enable the development of an appraisal tool to content assess LHD strategic health service plans. Results The strategies that are planned for health systems integration across LHDs focus most often on improvements in coordination, health care access and care delivery for complex at-risk patients across the care continuum by both state- and commonwealth-funded systems, providers and agencies. The most common reasons given for integrated activities were to reduce avoidable hospitalisation, avoid inappropriate emergency department attendance and improve patient care. Conclusions Despite the importance of health systems integration and finding that all NSW LHDs have made some commitment towards integration in their current strategic health plans, this analysis suggests that health systems integration is in relatively early development across NSW. What is known about the topic? Effective approaches to managing complex chronic diseases have been found to involve health systems integration, which necessitates sound communication and connection between healthcare providers across community and hospital settings. Planning based on current health systems integration knowledge to ensure the efficient use of scarce resources is a responsibility of all health systems. What does this paper add? Appropriate planning and implementation of health systems integration is becoming an increasingly important expectation and requirement of effective health systems. The present study is the first of its kind to assess the planned activity in health systems integration in the NSW public health system. NSW health districts play a central role in health systems integration; each health service plan outlines the strategic directions for the development and delivery of all state-funded services across each district for the coming years, equating to hundreds of millions of dollars in health sector funding. The inclusion of effective health systems integration strategies allows Local Health Districts to lay the foundation for quality patient outcomes and long-term financial sustainability despite projected increases in demand for health services. What are the implications for practice? Establishing robust ongoing mechanisms for effective health systems integration is now a necessary part of health planning. The present study identifies several key areas and strategies that are wide in scope and indicative of efforts towards health systems integration, which may support Local Health Districts and other organisations in systematic planning and implementation.

  19. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.; Dublin, M.

    1973-01-01

    A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

  20. Software verification plan for GCS. [guidance and control software

    NASA Technical Reports Server (NTRS)

    Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.

    1990-01-01

    This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

  1. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    NASA Astrophysics Data System (ADS)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  2. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.; Zuzek, John E.

    1987-01-01

    Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  3. Deadline Extended for Public Comment on IOOS' Draft Plan for Data Management andCommunications Component

    NASA Astrophysics Data System (ADS)

    The U.S. Integrated Ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and Communications (DMAC∥ component. The deadline for receipt of comments has been extended to 18 November 2003. The plan can be found at http://www.dmac.ocean.us/dacsc/imp_plan.jsp. The plan was developed by the DMAC Steering Committee, which includes representatives from federal and state agencies, private industry, and academia. This committee was tasked by Ocean.US (the national office for IOOS) with the preparation of a detailed, phased DMAC implementation plan, and initial oversight of its implementation. The scope of the plan includes the IOOS DMAC infrastructure, data archive and access, and basic information products needed for assessing the availability and quality of data within IOOS. Four expert teams (Data Transport, Metadata and Data Discovery, Data Archive and Access, Applications and Products), and two outreach teams (Data Facilities Management, and User Outreach), were assembled to assist in developing material for the plan.

  4. The role of CQI in the strategic planning process.

    PubMed

    Sahney, V K; Warden, G L

    1993-01-01

    This article describes the strategic planning process used to define the health care needs of a region and to prepare Henry Ford Health System (HFHS) to meet the needs of the 21st century. It presents key applications of continuous quality improvement in the development and implementation of the strategic plans for HFHS; explains how HFHS adapted the Deming/Shewhart cycle of continuous improvement for the purpose of improving its planning process; and delineates how the strategic planning, financial planning, and quality planning processes have been integrated.

  5. Guide to Developing an Environmental Management System - Act

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Act section.

  6. Guide to Developing an Environmental Management System - Check

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Check section.

  7. Implementation of the EU Noise Directive in Process of Urban Planning in Poland

    NASA Astrophysics Data System (ADS)

    Kwiecień, J.; Szopińska, K.

    2013-05-01

    In Poland spatial planning policies are described by a system of planning documents controlled by act of Spatial Planning and Land Development of 27 March 2003. Sustainable development principle and spatial order form is the basis of spatial planning efforts. In the territory of Poland the manner of urban space management is defined by a planning document called Local Land Use Plan (LLUP). In a LLUP some issues are arranged, such as the purpose of a given area, location of public purpose investments, land development conditions. When analysing the development process of Polish cities, an obvious conclusion emerges about the lack of complex studies and researches of the environment concerning the issue of acoustic climate. The procedures of development of an LLUP involve merely a general diagnosis of an environment excluding measured values of pollution, including noise levels. The main aim of this article is to introduce the influence of acoustic climate on the urban space planning in Poland through the implementation of the provisions of Directive 2002/49/WE of the European Parliament and the Council of Europe from 25 June 2002. Moreover, in the stages of an LLUP implementations have been suggested the use of a Strategic Noise Map, being a tool for assisting the process of environmental noise level assessment in Poland.

  8. Transition in Gas Turbine Control System Architecture: Modular, Distributed, and Embedded

    NASA Technical Reports Server (NTRS)

    Culley, Dennis

    2010-01-01

    Controls systems are an increasingly important component of turbine-engine system technology. However, as engines become more capable, the control system itself becomes ever more constrained by the inherent environmental conditions of the engine; a relationship forced by the continued reliance on commercial electronics technology. A revolutionary change in the architecture of turbine-engine control systems will change this paradigm and result in fully distributed engine control systems. Initially, the revolution will begin with the physical decoupling of the control law processor from the hostile engine environment using a digital communications network and engine-mounted high temperature electronics requiring little or no thermal control. The vision for the evolution of distributed control capability from this initial implementation to fully distributed and embedded control is described in a roadmap and implementation plan. The development of this plan is the result of discussions with government and industry stakeholders

  9. Acquisition Handbook - Update. Comprehensive Approach to Reusable Defensive Software (CARDS)

    DTIC Science & Technology

    1994-03-25

    designs, and implementation components (source code, test plans, procedures and results, and system/software documentation). This handbook provides a...activities where software components are acquired, evaluated, tested and sometimes modified. In addition to serving as a facility for the acquisition and...systems from such components [1]. Implementation components are at the lowest level and consist of: specifications; detailed designs; code, test

  10. Prototyping a bedside documentation system.

    PubMed

    Bachand, P; Bobis, K

    1993-01-01

    The implementation of a comprehensive bedside documentation system is a major project that demands careful analysis and planning. Since the cost of a typical bedside system can easily exceed $3 million, a design oversight could have disastrous effects on the benefits of the system.

  11. Decentralized Modular Systems Versus Centralized Systems.

    ERIC Educational Resources Information Center

    Crossey, R. E.

    Building design, planning, and construction programing for modular decentralized mechanical building systems are outlined in terms of costs, performance, expansion and flexibility. Design strategy, approach, and guidelines for implementing such systems for buildings are suggested, with emphasis on mechanical equipment and building element…

  12. The Design and Implementation of an Alternative High School.

    ERIC Educational Resources Information Center

    Kritek, William J.

    The analysis of the planning for an implementation of an alternative high school in a large urban school system is the focus of this study. Interview data are used. This investigation draws on, and compliments, the previous literature on implementation. While most of the earlier studies look at failures, this one is based on an instance of…

  13. Exploring the Effects of Technology Overload on the Outcomes of Enterprise Resource Planning (ERP) Implementation Projects

    ERIC Educational Resources Information Center

    Kates, Earl B.

    2016-01-01

    Despite significant investments made by organizations to implement ERP systems and prior research that explored contributing factors of ERP failure, the ERP implementation success rate continues to remain low in practice. Increased technology usage in the workplace coupled with higher dependency on technology to complete project tasks often leads…

  14. Features of computerized clinical decision support systems supportive of nursing practice: a literature review.

    PubMed

    Lee, Seonah

    2013-10-01

    This study aimed to organize the system features of decision support technologies targeted at nursing practice into assessment, problem identification, care plans, implementation, and outcome evaluation. It also aimed to identify the range of the five stage-related sequential decision supports that computerized clinical decision support systems provided. MEDLINE, CINAHL, and EMBASE were searched. A total of 27 studies were reviewed. The system features collected represented the characteristics of each category from patient assessment to outcome evaluation. Several features were common across the reviewed systems. For the sequential decision support, all of the reviewed systems provided decision support in sequence for patient assessment and care plans. Fewer than half of the systems included problem identification. There were only three systems operating in an implementation stage and four systems in outcome evaluation. Consequently, the key steps for sequential decision support functions were initial patient assessment, problem identification, care plan, and outcome evaluation. Providing decision support in such a full scope will effectively help nurses' clinical decision making. By organizing the system features, a comprehensive picture of nursing practice-oriented computerized decision support systems was obtained; however, the development of a guideline for better systems should go beyond the scope of a literature review.

  15. Software for Probabilistic Risk Reduction

    NASA Technical Reports Server (NTRS)

    Hensley, Scott; Michel, Thierry; Madsen, Soren; Chapin, Elaine; Rodriguez, Ernesto

    2004-01-01

    A computer program implements a methodology, denoted probabilistic risk reduction, that is intended to aid in planning the development of complex software and/or hardware systems. This methodology integrates two complementary prior methodologies: (1) that of probabilistic risk assessment and (2) a risk-based planning methodology, implemented in a prior computer program known as Defect Detection and Prevention (DDP), in which multiple requirements and the beneficial effects of risk-mitigation actions are taken into account. The present methodology and the software are able to accommodate both process knowledge (notably of the efficacy of development practices) and product knowledge (notably of the logical structure of a system, the development of which one seeks to plan). Estimates of the costs and benefits of a planned development can be derived. Functional and non-functional aspects of software can be taken into account, and trades made among them. It becomes possible to optimize the planning process in the sense that it becomes possible to select the best suite of process steps and design choices to maximize the expectation of success while remaining within budget.

  16. An Implementation Plan for NFS at NASA's NAS Facility

    NASA Technical Reports Server (NTRS)

    Lam, Terance L.; Kutler, Paul (Technical Monitor)

    1998-01-01

    This document discusses how NASA's NAS can benefit from the Sun Microsystems' Network File System (NFS). A case study is presented to demonstrate the effects of NFS on the NAS supercomputing environment. Potential problems are addressed and an implementation strategy is proposed.

  17. Multi-Modal Traveler Information System - Gateway Phased Implementation Plan

    DOT National Transportation Integrated Search

    1997-11-25

    The purpose of this working paper is to provide the main concepts and elements that need to be addressed in the overall implementation of the Gateway, both the Initial Phase and the Ultimate Phase. This working paper addresses these concepts and elem...

  18. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  19. Sustainability and transformation plans: translating the perspectives.

    PubMed

    Thakrar, Sonali V; Bell, Diane

    2017-10-02

    Each local health economy has been tasked with producing a sustainability and transformation plan. A health economy is a system that controls and contributes to health-care resource and the effects of health services on its population. This includes commissioners, acute providers, primary care providers, community services, public health and the voluntary sector. Sustainability and transformation plans represent a shift in the way health care is planned for in England. The aim of each sustainability and transformation plan is to deliver care within existing resource limits by improving quality of care, developing new models of care and improving efficiency of care provision. The tight timescales for production of sustainability and transformation plans mean that in most cases there has been limited clinical engagement; as a result many clinicians have limited sight, understanding or ownership of the proposals within sustainability and transformation plans. As sustainability and transformation plans move into the implementation phase, this article explores the role of the clinician in the ongoing design and delivery of the local sustainability and transformation plans. By finding the common ground between the perspectives of the clinician, the commissioner and system leaders, the motivation of clinicians can be aligned with the ambitions of the sustainability and transformation plan. The common goal of a sustainability and transformation plan and the necessary collaboration required to make it successful is discussed. Ultimately, such translation is essential: clinicians are intelligent, adaptive and motivated individuals who must have a lead role in constructing and implementing plans that transform health and social care.

  20. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ...] Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY...) is proposing to approve a revision to the New York State Implementation Plan (SIP) for ozone... air quality standards for ozone. DATES: Comments must be received on or before December 20, 2013...

  1. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY: Environmental... a proposed revision to the New York State Implementation Plan (SIP) for ozone concerning the control... national ambient air quality standards for ozone. DATES: Effective Date: This rule will be effective April...

  2. JPL Contamination Control Engineering

    NASA Technical Reports Server (NTRS)

    Blakkolb, Brian

    2013-01-01

    JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.

  3. The Carter Energy Plan

    ERIC Educational Resources Information Center

    Coan, Gene

    1977-01-01

    Plans for the implementation of a national energy policy are outlined. Proposed measures in the following areas are discussed: energy conservation; energy systems and rates; energy pricing and equity; coal, oil and gas production; nuclear and solar power; and industry structure and competition. Concerns of environmentalists are expressed. (AJ)

  4. PLANNING AND COORDINATION OF ACTIVITIES SUPPORTING THE RUSSIAN SYSTEM OF CONTROL AND ACCOUNTING OF NUCLEAR MATERIALS AT ROSATOM FACILITIES IN THE FRAMEWORK OF THE U.S.-RUSSIAN COOPERATION.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SVIRIDOVA, V.V.; ERASTOV, V.V.; ISAEV, N.V.

    2005-05-16

    The MC&A Equipment and Methodological Support Strategic Plan (MEMS SP) for implementing modern MC&A equipment and methodologies at Rosatom facilities has been developed within the framework of the U.S.-Russian MPC&A Program. This plan developed by the Rosatom's Russian MC&A Equipment and Methodologies (MEM) Working Group and is coordinated by that group with support and coordination provided by the MC&A Measurements Project, Office of National Infrastructure and Sustainability, US DOE. Implementation of different tasks of the MEMS Strategic Plan is coordinated by Rosatom and US-DOE in cooperation with different U.S.-Russian MC&A-related working groups and joint site project teams. This cooperation allowsmore » to obtain and analyze information about problems, current needs and successes at Rosatom facilities and facilitates solution of the problems, satisfying the facilities' needs and effective exchange of expertise and lessons learned. The objective of the MEMS Strategic Plan is to enhance effectiveness of activities implementing modern equipment and methodologies in the Russian State MC&A system. These activities are conducted within the joint Russian-US MPC&A program aiming at reduction of possibility for theft or diversion of nuclear materials and enhancement of control of nuclear materials.« less

  5. Using a social-ecological framework to inform the implementation of conservation plans.

    PubMed

    Guerrero, Angela M; Wilson, Kerrie A

    2017-04-01

    One of the key determinants of success in biodiversity conservation is how well conservation planning decisions account for the social system in which actions are to be implemented. Understanding elements of how the social and ecological systems interact can help identify opportunities for implementation. Utilizing data from a large-scale conservation initiative in southwestern of Australia, we explored how a social-ecological system framework can be applied to identify how social and ecological factors interact to influence the opportunities for conservation. Using data from semistructured interviews, an online survey, and publicly available data, we developed a conceptual model of the social-ecological system associated with the conservation of the Fitz-Stirling region. We used this model to identify the relevant variables (remnants of vegetation, stakeholder presence, collaboration between stakeholders, and their scale of management) that affect the implementation of conservation actions in the region. We combined measures for these variables to ascertain how areas associated with different levels of ecological importance coincided with areas associated with different levels of stakeholder presence, stakeholder collaboration, and scales of management. We identified areas that could benefit from different implementation strategies, from those suitable for immediate conservation action to areas requiring implementation over the long term to increase on-the-ground capacity and identify mechanisms to incentivize implementation. The application of a social-ecological framework can help conservation planners and practitioners facilitate the integration of ecological and social data to inform the translation of priorities for action into implementation strategies that account for the complexities of conservation problems in a focused way. © 2016 Society for Conservation Biology.

  6. Diverter AI based decision aid, phases 1 and 2

    NASA Technical Reports Server (NTRS)

    Sexton, George A.; Bayles, Scott J.; Patterson, Robert W.; Schulke, Duane A.; Williams, Deborah C.

    1989-01-01

    It was determined that a system to incorporate artificial intelligence (AI) into airborne flight management computers is feasible. The AI functions that would be most useful to the pilot are to perform situational assessment, evaluate outside influences on the contemplated rerouting, perform flight planning/replanning, and perform maneuver planning. A study of the software architecture and software tools capable of demonstrating Diverter was also made. A skeletal planner known as the Knowledge Acquisition Development Tool (KADET), which is a combination script-based and rule-based system, was used to implement the system. A prototype system was developed which demonstrates advanced in-flight planning/replanning capabilities.

  7. Kernel-based Linux emulation for Plan 9.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minnich, Ronald G.

    2010-09-01

    CNKemu is a kernel-based system for the 9k variant of the Plan 9 kernel. It is designed to provide transparent binary support for programs compiled for IBM's Compute Node Kernel (CNK) on the Blue Gene series of supercomputers. This support allows users to build applications with the standard Blue Gene toolchain, including C++ and Fortran compilers. While the CNK is not Linux, IBM designed the CNK so that the user interface has much in common with the Linux 2.0 system call interface. The Plan 9 CNK emulator hence provides the foundation of kernel-based Linux system call support on Plan 9.more » In this paper we discuss cnkemu's implementation and some of its more interesting features, such as the ability to easily intermix Plan 9 and Linux system calls.« less

  8. A multitasking behavioral control system for the Robotic All-Terrain Lunar Exploration Rover (RATLER)

    NASA Technical Reports Server (NTRS)

    Klarer, Paul

    1993-01-01

    An approach for a robotic control system which implements so called 'behavioral' control within a realtime multitasking architecture is proposed. The proposed system would attempt to ameliorate some of the problems noted by some researchers when implementing subsumptive or behavioral control systems, particularly with regard to multiple processor systems and realtime operations. The architecture is designed to allow synchronous operations between various behavior modules by taking advantage of a realtime multitasking system's intertask communications channels, and by implementing each behavior module and each interconnection node as a stand-alone task. The potential advantages of this approach over those previously described in the field are discussed. An implementation of the architecture is planned for a prototype Robotic All Terrain Lunar Exploration Rover (RATLER) currently under development and is briefly described.

  9. Long Term Planning for EFA and the MDGs: Modes and Mechanisms. Create Pathways to Access. Research Monograph No. 7

    ERIC Educational Resources Information Center

    Lewin, Keith M.

    2007-01-01

    This discussion paper provides an overview and analytic guide to long term planning of education systems in the context of Education for All and the Millennium Development Goals. Long term gains in educational access depend on anticipating future financial and non-financial constraints on growth and on successful implementation of plans which…

  10. Strategic workforce planning for a multihospital, integrated delivery system.

    PubMed

    Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience

    2012-01-01

    Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.

  11. MO-D-BRB-02: SBRT Treatment Planning and Delivery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, Y.

    2016-06-15

    Increased use of SBRT and hypofractionation in radiation oncology practice has posted a number of challenges to medical physicist, ranging from planning, image-guided patient setup and on-treatment monitoring, to quality assurance (QA) and dose delivery. This symposium is designed to provide current knowledge necessary for the safe and efficient implementation of SBRT in various linac platforms, including the emerging digital linacs equipped with high dose rate FFF beams. Issues related to 4D CT, PET and MRI simulations, 3D/4D CBCT guided patient setup, real-time image guidance during SBRT dose delivery using gated/un-gated VMAT/IMRT, and technical advancements in QA of SBRT (inmore » particular, strategies dealing with high dose rate FFF beams) will be addressed. The symposium will help the attendees to gain a comprehensive understanding of the SBRT workflow and facilitate their clinical implementation of the state-of-art imaging and planning techniques. Learning Objectives: Present background knowledge of SBRT, describe essential requirements for safe implementation of SBRT, and discuss issues specific to SBRT treatment planning and QA. Update on the use of multi-dimensional and multi-modality imaging for reliable guidance of SBRT. Discuss treatment planning and QA issues specific to SBRT. Provide a comprehensive overview of emerging digital linacs and summarize the key geometric and dosimetric features of the new generation of linacs for substantially improved SBRT. NIH/NCI; Varian Medical Systems; F. Yin, Duke University has a research agreement with Varian Medical Systems. In addition to research grant, I had a technology license agreement with Varian Medical Systems.« less

  12. 29 CFR 1952.91 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be completed by December 1972. (c) A management information system to be completed by no later than..., 1973. (g) An approved merit system covering employees implementing the plan to be effective 90 days...

  13. Avionics test bed development plan

    NASA Technical Reports Server (NTRS)

    Harris, L. H.; Parks, J. M.; Murdock, C. R.

    1981-01-01

    A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

  14. An overview of the evaluation plan for PC/MISI: PC-based Multiple Information System Interface

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Lim, Bee Lee; Hall, Philip P.

    1985-01-01

    An initial evaluation plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intend to be used as a blueprint for the evaluation of this system. Each objective of the design project is discussed along with the evaluation parameters and methodology to be used in the evaluation of the implementation's achievement of those objectives. The potential of the system for research activities related to more general aspects of information retrieval is also discussed.

  15. Social cost considerations and legal constraints in implementing modular integrated utility systems

    NASA Technical Reports Server (NTRS)

    Lede, N. W.; Dixon, H. W.; King, O.; Hill, D. K.

    1974-01-01

    Social costs associated with the design, demonstration, and implementation of the Modular Integrated Utility System are considered including the social climate of communities, leadership patterns, conflicts and cleavages, specific developmental values, MIUS utility goal assessment, and the suitability of certian alternative options for use in a program of implementation. General considerations are discussed in the field of socio-technological planning. These include guidelines for understanding the conflict and diversity; some relevant goal choices and ideas useful to planners of the MIUS facility.

  16. A web-based computer aided system for liver surgery planning: initial implementation on RayPlus

    NASA Astrophysics Data System (ADS)

    Luo, Ming; Yuan, Rong; Sun, Zhi; Li, Tianhong; Xie, Qingguo

    2016-03-01

    At present, computer aided systems for liver surgery design and risk evaluation are widely used in clinical all over the world. However, most systems are local applications that run on high-performance workstations, and the images have to processed offline. Compared with local applications, a web-based system is accessible anywhere and for a range of regardless of relative processing power or operating system. RayPlus (http://rayplus.life.hust.edu.cn), a B/S platform for medical image processing, was developed to give a jump start on web-based medical image processing. In this paper, we implement a computer aided system for liver surgery planning on the architecture of RayPlus. The system consists of a series of processing to CT images including filtering, segmentation, visualization and analyzing. Each processing is packaged into an executable program and runs on the server side. CT images in DICOM format are processed step by to interactive modeling on browser with zero-installation and server-side computing. The system supports users to semi-automatically segment the liver, intrahepatic vessel and tumor from the pre-processed images. Then, surface and volume models are built to analyze the vessel structure and the relative position between adjacent organs. The results show that the initial implementation meets satisfactorily its first-order objectives and provide an accurate 3D delineation of the liver anatomy. Vessel labeling and resection simulation are planned to add in the future. The system is available on Internet at the link mentioned above and an open username for testing is offered.

  17. Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte

    1992-01-01

    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

  18. ERP implementation in hospitals: a case study.

    PubMed

    Agarwal, Divya; Garg, Poonam

    2012-01-01

    In a competitive healthcare sector, hospitals have to focus on their processes in order to deliver high-quality care while at the same time reducing costs. Many hospitals have decided to adopt one or another Enterprise Resource Planning (ERP) system to improve their businesses, but implementing an ERP system can be a demanding endeavour. The systems are so difficult to implement that some are successful; many have failed, causing multimillion dollar losses. The challenge of ERP solutions lie in implementation because they are complex, time consuming and expensive too. This paper describes the various process workflows and phases of ERP implementation at Fortis Hospital Cunningham Road, Bangalore, India. This knowledge will provide valuable insights for the researchers and practitioners to understand the different process workflows and to make informed decisions when implementing ERP in any hospital.

  19. Care plans and care planning in long-term conditions: a conceptual model.

    PubMed

    Burt, Jenni; Rick, Jo; Blakeman, Thomas; Protheroe, Joanne; Roland, Martin; Bower, Pete

    2014-10-01

    The prevalence and impact of long-term conditions continues to rise. Care planning for people with long-term conditions has been a policy priority for chronic disease management in a number of health-care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between 'care planning' (the process by which health-care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a 'care plan' (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health-care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans.

  20. Antimicrobial resistance: from global agenda to national strategic plan, Thailand.

    PubMed

    Tangcharoensathien, Viroj; Sattayawutthipong, Wanchai; Kanjanapimai, Sukhum; Kanpravidth, Wantanee; Brown, Richard; Sommanustweechai, Angkana

    2017-08-01

    In Thailand, antimicrobial resistance has formed a small component of national drug policies and strategies on emerging infectious diseases. However, poor coordination and a lack of national goals and monitoring and evaluation platforms have reduced the effectiveness of the corresponding national actions. On the basis of local evidence and with the strong participation of relevant stakeholders, the first national strategic plan on antimicrobial resistance has been developed in Thailand. Before the development of the plan, ineffective coordination meant that antimicrobial resistance profiles produced at sentinel hospitals were not used effectively for clinical decision-making. There was no integrated system for the surveillance of antimicrobial resistance, no system for monitoring consumption of antimicrobial drugs by humans, livestock and pets and little public awareness of antimicrobial resistance. In August 2016, the Thai government endorsed a national strategic plan on antimicrobial resistance that comprised six strategic actions and five targets. A national steering committee guides the plan's implementation and a module to assess the prevalence of household antibiotic use and antimicrobial resistance awareness has been embedded into the biennial national health survey. A national system for the surveillance of antimicrobial consumption has also been initiated. Strong political commitment, national ownership and adequate multisectoral institutional capacities will be essential for the effective implementation of the national plan. A robust monitoring and evaluation platform now contributes to evidence-based interventions. An integrated system for the surveillance of antimicrobial resistance still needs to be established.

  1. Plan of Study for the Tidal Power Study, Cobscook Bay, Maine, USA

    DTIC Science & Technology

    1978-09-01

    Considerations and Acceptability * Implementation Feasibility s Financial -Institutional Aspects * Public Health In preparing data for the System of Accounts ...Goals and Objectives a. National Objectives b. National Accounts c. Related National Policies d. The Study Objectives e. New England Federal Regional...Alternatives Development of Intermediate Plans 1. System of Accounts 2. Range of Alternatives to be considered 3. Other Evaluation Considerations 4

  2. U.S. Support of Plan Colombia: Rethinking the Ends and Means

    DTIC Science & Technology

    2001-05-01

    to thrive as long as there are dark corners of the international systems where traditional sovereign controls are weak or non -existent. The illicit...security debate involving U.S. policy in Colombia and the implementation of Plan Colombia. DOUGLAS C. LOVELACE, JR. Director Strategic Studies...crime more efficiently through effective international cooperation, which includes the press, judicial systems, and government officials on a broad

  3. Economic Security Environment and Implementation of Planning, Programming, Budgeting, Execution (PPBE) System in Georgia

    DTIC Science & Technology

    2004-06-01

    11 Table 2. Main Macroeconomic Indicators of the State Budget (From: Ref. 21) ...........13 Table 3. State Budget Expenditures...programs with alternative options and Budget Estimations - called Planning, Programming and Budget System (PPBS). The principles and main idea of Defense...about the political fundamentals of building the state, market economy principles , and the advantages of globalization. Georgia was among the first

  4. Comprehensive System of Personnel Development: A Writer's Handbook. Project on Cooperative Manpower Planning in Special Education. Revised.

    ERIC Educational Resources Information Center

    Schofer, Richard C.; And Others

    A handbook to assist states in fulfilling requirements of Public Law 94-142 to provide a Comprehensive System of Personnel Development (CSPD) for special education staff is presented. The handbook is intended to help writers develop, review, update, and implement the CSPD, which is one section of the state plan submitted to the federal government.…

  5. Dosimetric evaluation of the clinical implementation of the first commercial IMRT Monte Carlo treatment planning system at 6 MV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heath, Emily; Seuntjens, Jan; Sheikh-Bagheri, Daryoush

    2004-10-01

    In this work we dosimetrically evaluated the clinical implementation of a commercial Monte Carlo treatment planning software (PEREGRINE, North American Scientific, Cranberry Township, PA) intended for quality assurance (QA) of intensity modulated radiation therapy treatment plans. Dose profiles calculated in homogeneous and heterogeneous phantoms using this system were compared to both measurements and simulations using the EGSnrc Monte Carlo code for the 6 MV beam of a Varian CL21EX linear accelerator. For simple jaw-defined fields, calculations agree within 2% of the dose at d{sub max} with measurements in homogeneous phantoms with the exception of the buildup region where the calculationsmore » overestimate the dose by up to 8%. In heterogeneous lung and bone phantoms the agreement is within 3%, on average, up to 5% for a 1x1 cm{sup 2} field. We tested two consecutive implementations of the MLC model. After matching the calculated and measured MLC leakage, simulations of static and dynamic MLC-defined fields using the most recent MLC model agreed to within 2% with measurements.« less

  6. Solar Power Satellites

    NASA Technical Reports Server (NTRS)

    Kraft, C. C., Jr.

    1977-01-01

    A satellite based energy concept is described, including the advantages of the basic concept, system characteristics, cost, and environmental considerations. An outline of a plan for the further evaluation and implementation of the system is given. It is concluded that the satellite concept is competitive with other advanced power generation systems when a variety of factors are considered, including technical feasibility, cost, safety, natural resources, environment, baseload capability, location flexibility, land use, and existing industrial base for implementation.

  7. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1991-01-01

    This quarterly reports on space communications, radio navigation, radio science, and ground based radio and radar astronomy in connection with the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and in operations. Also included is standards activity at JPL for space data and information systems and DSN work. Specific areas of research are: Tracking and ground based navigation; Spacecraft and ground communications; Station control and system technology; DSN Systems Implementation; and DSN Operations.

  8. DECISION-SUPPORT TOOLS FOR MANAGING WASTEWATER COLLECTION SYSTEMS

    EPA Science Inventory

    Wastewater collection systems are an extensive part of the nation's infrastructure. As these systems become older, more preventative maintenance and renewal are required. For municipalities to cost-effectively plan, organize, and implement this effort, they require improved inf...

  9. Pavement management system for City of Madison : research brief.

    DOT National Transportation Integrated Search

    2016-11-01

    In this study, a complete pavement management system (PMS) was created and implemented in : Madison, SD. The system consists of a street geodatabase, development of pavement performance : models and maintenance & rehabilitation (M&R) plans. The PMS d...

  10. Systems engineering management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the operation of freeways, arterials, and public transit. The system will be shared between information system...

  11. 23 CFR 500.111 - IMS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... facilities and systems and improvement in the coordination in planning, and implementation of air, water, and... transportation, where the performance or use of one mode will affect another; (c) Definition of strategies for improving the effectiveness of these modal interactions; and (d) Evaluation and implementation of these...

  12. System for Urban Stormwater Treatment and Analysis IntegratioN (SUSTAIN)

    EPA Pesticide Factsheets

    SUSTAIN is a decision support system that assists stormwater management professionals with developing and implementing plans for flow and pollution control measures to protect source waters and meet water quality goals.

  13. Planning and Implementing Immunization Billing Programs at State and Local Health Departments: Barriers and Possible Solutions.

    PubMed

    Corriero, Rosemary; Redmon, Ginger

    Before participating in a project funded by the Centers for Disease Control and Prevention, most state and local health departments (LHDs) were not seeking reimbursement or being fully reimbursed by insurance plans for the cost of immunization services (including vaccine costs and administration fees) they provided to insured patients. Centers for Disease Control and Prevention's Billables Project was designed to enable state and LHDs to bill public and private insurance plans for immunization services provided to insured patients. Identify and describe key barriers state and LHDs may encounter while planning and implementing a billing program, as well as possible solutions for overcoming those barriers. This study used reports from Billables Project participants to explore barriers they encountered when planning and implementing a billing program and steps taken to address those barriers. Thirty-eight state immunization programs. Based on project participants' reports, barriers were noted in 7 categories: (1) funding and costs, (2) staff, (3) health department characteristics, (4) third-party payers and insurance plans, (5) software, (6) patient insurance status, and (7) other barriers. Possible solutions for overcoming those barriers included hiring or seeking external help, creating billing guides and training modules, streamlining workflows, and modifying existing software systems. Overcoming barriers during planning and implementation of a billing program can be challenging for state and LHDs, but the experiences and suggestions of past Billables Project participants can help guide future billing program efforts.

  14. Approved Air Quality Implementation Plans in The Virgin Islands

    EPA Pesticide Factsheets

    This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.

  15. Ecology and policy for exclusive breastfeeding in Colombia: a proposal

    PubMed Central

    2012-01-01

    Introduction: Breastfeeding promotion is one of the most important strategies against infant mortality and to control child undernourishment. Despite policies and plans to promote and protect breastfeeding in Colombia, its practice is low and its duration is short. Objective: To propose an ecology framework to interpret and incorporate contextual, interpersonal, and individual factors associated with the practice of breastfeeding and duration. Thereby, the plans and policies addressed to promote and protect breastfeeding in Colombia could be reinforced. Conclusions: To implement an ecology framework for Breastfeeding in Colombia, it is necessary to identify the effect of contextual factors in the biggest cultural regions of Colombia, to recognize the limitations of Infant-Friendly Hospital Initiatives to improve exclusive breastfeeding duration, to execute prospective studies in order to identify factors associated with breastfeeding duration, to design and implement plans and policies based on comprehensive planning strategies of healthcare interventions, to develop appropriate and cost-effective extra-institutional strategies aimed at prolonging the duration of breastfeeding, and to implement more reliable breastfeeding surveillance systems. PMID:24893193

  16. Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singh, Ravindra; Reilly, James T.; Wang, Jianhui

    Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to commonmore » barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.« less

  17. Planning for Competency-Based Teacher Education at the State Level.

    ERIC Educational Resources Information Center

    Roth, Robert A.

    There are eight areas which require attention in planning for state implementation of performance-based teacher education (PBTE): (a) initiation action, (b) goal statement formulation, (c) state role identification, (d) certification pattern design, (e) delivery system structure, (f) support mechanism organization, (g) regulation changes…

  18. Critical Mass: Education and the Economy.

    ERIC Educational Resources Information Center

    Groff, Warren H.

    1984-01-01

    Underscores the importance of strategic planning and management in higher education in the future, emphasizing the need to develop the intellectual capital necessary to implement planning and management systems to tighten the relationship between education and the economy. Discusses selected facts about the economy and the challenges facing…

  19. Design controls for large order systems

    NASA Technical Reports Server (NTRS)

    Doane, George B., III

    1991-01-01

    The output of this task will be a program plan which will delineate how MSFC will support and implement its portion of the Inter-Center Computational Controls Program Plan. Another output will be the results of looking at various multibody/multidegree of freedom computer programs in various environments.

  20. 45 CFR 1304.51 - Management systems and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... annual self- assessment; and (iii) The development of written plan(s) for implementing services in each of the program areas covered by this part (e.g., Early Childhood Development and Health Services... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...

  1. Dosimetric validation and clinical implementation of two 3D dose verification systems for quality assurance in volumetric-modulated arc therapy techniques.

    PubMed

    Clemente-Gutiérrez, Francisco; Pérez-Vara, Consuelo

    2015-03-08

    A pretreatment quality assurance program for volumetric techniques should include redundant calculations and measurement-based verifications. The patient-specific quality assurance process must be based in clinically relevant metrics. The aim of this study was to show the commission, clinical implementation, and comparison of two systems that allow performing a 3D redundant dose calculation. In addition, one of them is capable of reconstructing the dose on patient anatomy from measurements taken with a 2D ion chamber array. Both systems were compared in terms of reference calibration data (absolute dose, output factors, percentage depth-dose curves, and profiles). Results were in good agreement for absolute dose values (discrepancies were below 0.5%) and output factors (mean differences were below 1%). Maximum mean discrepancies were located between 10 and 20 cm of depth for PDDs (-2.7%) and in the penumbra region for profiles (mean DTA of 1.5 mm). Validation of the systems was performed by comparing point-dose measurements with values obtained by the two systems for static, dynamic fields from AAPM TG-119 report, and 12 real VMAT plans for different anatomical sites (differences better than 1.2%). Comparisons between measurements taken with a 2D ion chamber array and results obtained by both systems for real VMAT plans were also performed (mean global gamma passing rates better than 87.0% and 97.9% for the 2%/2 mm and 3%/3 mm criteria). Clinical implementation of the systems was evaluated by comparing dose-volume parameters for all TG-119 tests and real VMAT plans with TPS values (mean differences were below 1%). In addition, comparisons between dose distributions calculated by TPS and those extracted by the two systems for real VMAT plans were also performed (mean global gamma passing rates better than 86.0% and 93.0% for the 2%/2 mm and 3%/ 3 mm criteria). The clinical use of both systems was successfully evaluated.

  2. Person-centered care planning and service engagement: a study protocol for a randomized controlled trial.

    PubMed

    Stanhope, Victoria; Tondora, Janis; Davidson, Larry; Choy-Brown, Mimi; Marcus, Steven C

    2015-04-22

    Service disengagement is a pervasive challenge the mental health care system faces. Mental health services are of little value should persons with mental illnesses continue to opt out of receiving them. Consumers attribute disengagement from care to an absence of choice in their treatment. In response, the mental health system is adopting a person-centered model, based upon recovery principles, to engage consumers more actively in their care. Person-centered care planning is a promising practice involving collaboration to develop and implement an actionable plan to assist the person in achieving personal recovery goals. This study design combines a parallel-group randomized controlled trial of community mental health organizations with qualitative methods to assess the effectiveness of person-centered care planning. Participants at 14 sites in Delaware and Connecticut will be randomized to treatment as usual or the person-centered care planning intervention. Participants will be in leadership (n = 70) or supervisory or direct care (n = 210) roles. The person-centered care planning intervention involves intensive staff training and 12 months of ongoing technical assistance. Quantitative survey data will be collected at baseline, 6 months and 12 months measuring person-centered care planning competency and organizational factors. Consumer outcomes (engagement, medication adherence, functioning and consumer satisfaction) will be assessed by Medicaid and state-level data. Qualitative data focused on process factors will include staff and consumer interviews and focus groups. In this intent-to-treat analysis, we will use mixed-effects multivariate regression models to evaluate the differential impact of the person-centered care planning intervention on each consumer and implementation outcome as well as the extent to which clinician assessments of organizational factors are associated with the implementation outcome. Mixed methods will triangulate and strengthen the interpretation of outcomes. The aim of this study is to generate valuable guidance for state systems engaged in scale-up and transformation efforts. Targeted staff selection for training to support sustainability will serve to provide further insight into important intervention implementation strategies. Person-centered care planning has the potential to enhance the impact of all evidence-based and recovery-oriented practices and bring practice into line with the emerging national guidelines in health care reform. This trial was registered with ClinicalTrials.gov (Identifier: NCT02299492) on 21 November 2014 as New York University Protocol Record PCCP-13-9762, Person-Centered Care Planning and Service Engagement.

  3. Using C to build a satellite scheduling expert system: Examples from the Explorer platform planning system

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Tuchman, Alan; Potter, William J.

    1991-01-01

    Recently, many expert systems were developed in a LISP environment and then ported to the real world C environment before the final system is delivered. This situation may require that the entire system be completely rewritten in C and may actually result in a system which is put together as quickly as possible with little regard for maintainability and further evolution. With the introduction of high performance UNIX and X-windows based workstations, a great deal of the advantages of developing a first system in the LISP environment have become questionable. A C-based AI development effort is described which is based on a software tools approach with emphasis on reusability and maintainability of code. The discussion starts with simple examples of how list processing can easily be implemented in C and then proceeds to the implementations of frames and objects which use dynamic memory allocation. The implementation of procedures which use depth first search, constraint propagation, context switching and a blackboard-like simulation environment are described. Techniques for managing the complexity of C-based AI software are noted, especially the object-oriented techniques of data encapsulation and incremental development. Finally, all these concepts are put together by describing the components of planning software called the Planning And Resource Reasoning (PARR) shell. This shell was successfully utilized for scheduling services of the Tracking and Data Relay Satellite System for the Earth Radiation Budget Satellite since May 1987 and will be used for operations scheduling of the Explorer Platform in November 1991.

  4. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...

  5. Communication Patterns in the Perioperative Environment During Epic Electronic Health Record System Implementation.

    PubMed

    Friend, Tynan H; Jennings, Samantha J; Levine, Wilton C

    2017-02-01

    In April 2016, Massachusetts General Hospital (MGH) went live with the Epic electronic health records (EHR) system, replacing a variety of EHRs that previously existed in different departments throughout the hospital. At the time of implementation, the Vocera® Badge Communication System, a wireless hands-free communication device distributed to perioperative team members, had increased perioperative communication flow and efficiency. As a quality improvement effort to better understand communication patterns during an EHR go-live, we monitored our Vocera call volume and user volume before, during and after our go-live. We noticed that call volume and user volume significantly increased during our immediate go-live period and quickly returned to baseline levels. We also noticed that call volume increased during periods of unplanned EHR downtime long after our immediate go-live period. When planning the implementation of a new EHR, leadership must plan for and support this critical communication need at the time of the go-live and must also be aware of these needs during unplanned downtime.

  6. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  7. Community Mobilization and Readiness: Planning Flaws which Challenge Effective Implementation of 'Communities that Care' (CTC) Prevention System.

    PubMed

    Basic, Josipa

    2015-01-01

    This article reviews the experience of implementing a community approach to drug use and youth delinquency prevention based on the 'Communities that Care' (CTC) system implemented in one Croatian county consisting of 12 communities, 2002 to 2013 (Hawkins, 1999; Hawkins & Catalano, 2004). This overview explores selected critical issues which are often not considered in substance use(r) community intervention planning, implementation as well as in associated process and outcome assessments. These issues include, among others, the mobilization process of adequate representation of people; the involvement of relevant key individual and organizational stakeholders and being aware of the stakeholders' willingness to participate in the prevention process. In addition, it is important to be aware of the stakeholders' knowledge and perceptions about the 'problems' of drug use and youth delinquency in their communities as well as the characteristics of the targeted population(s). Sometimes there are community members and stakeholders who block needed change and therefore prevention process enablers and 'bridges' should be involved in moving prevention programming forward. Another barrier that is often overlooked in prevention planning is community readiness to change and a realistic assessment of available and accessible resources for initiating the planned change(s) and sustaining them. All of these issues have been found to be potentially related to intervention success. At the end of this article, I summarize perspectives from prevention scientists and practitioners and lessons learned from communities' readiness research and practice in Croatian that has international relevance.

  8. Care plans and care planning in long term conditions: a conceptual model

    PubMed Central

    Burt, J; Rick, J; Blakeman, T; Protheroe, J; Roland, M; Bower, P

    2013-01-01

    The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority for chronic disease management in a number of health care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between ‘care planning’ (the process by which health care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a ‘care plan’ (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans. PMID:23883621

  9. Implementing Response to Intervention: Use of Innovation Configuration Maps within a Multiple-Case Study Analysis

    ERIC Educational Resources Information Center

    Fernando, Sheara

    2010-01-01

    The success of an implementation effort depends on the ability for a system to utilize the innovation effectively; the effective usage of an innovation can be determined by monitoring for program integrity and fidelity, and assessing the degree to which the program implementation matches the intended plan (Fixsen, Blase, Horner, & Sugai 2007). The…

  10. A Network Analysis Perspective to Implementation: The Example of Health Links to Promote Coordinated Care.

    PubMed

    Yousefi Nooraie, Reza; Khan, Sobia; Gutberg, Jennifer; Baker, G Ross

    2018-01-01

    Although implementation models broadly recognize the importance of social relationships, our knowledge about applying social network analysis (SNA) to formative, process, and outcome evaluations of health system interventions is limited. We explored applications of adopting an SNA lens to inform implementation planning, engagement and execution, and evaluation. We used Health Links, a province-wide program in Canada aiming to improve care coordination among multiple providers of high-needs patients, as an example of a health system intervention. At the planning phase, an SNA can depict the structure, network influencers, and composition of clusters at various levels. It can inform the engagement and execution by identifying potential targets (e.g., opinion leaders) and by revealing structural gaps and clusters. It can also be used to assess the outcomes of the intervention, such as its success in increasing network connectivity; changing the position of certain actors; and bridging across specialties, organizations, and sectors. We provided an overview of how an SNA lens can shed light on the complexity of implementation along the entire implementation pathway, by revealing the relational barriers and facilitators, the application of network-informed and network-altering interventions, and testing hypotheses on network consequences of the implementation.

  11. Multidisciplinary approach to successful implementation of production information system (PRISM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shariff, M.R.; Gopalakrishnan, S.G.; Francis, N.

    1995-12-31

    A company wide corporate and regional production database supporting all production areas was envisaged critical to the current expansion within Petronas Carigali Sdn Bhd (PCSB). A multi disciplinary project team was thus formed to analyze the requirements prior to developing, testing, implementing and training users. PCSB has currently evolved into a mature E & P company on par with other E & P companies within the region. This expansion necessitates a common Production Information System for the efficient dissemination of vital Production Information for Production Surveillance, Reservoir Management, Reserve Assessment, Special Studies and Standardized Group-wide Reporting. This paper will discussmore » all the phases involved in the project which includes Systems Requirement Study, Data Migration, System Development, System Implementation and Post-Implementation Plan.« less

  12. Acceptance testing for PACS: from methodology to design to implementation

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Huang, H. K.

    2004-04-01

    Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.

  13. Guide to Developing an Environmental Management System - Do

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. This is the Do section.

  14. Satellite services system analysis study. Volume 2, part 2: Study results

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The development of an effective satellite services system was investigated. Satek Satellite user market, design reference missions, satellite service functions, service equipment, and cost estimates are discussed. Extensive program plans for a satellite service system implementation are included.

  15. Final evaluation plan : Utah Transit Authority Connection Protection system

    DOT National Transportation Integrated Search

    2003-08-27

    Utah Transit Authority (UTA) implemented a Connection Protection system (CP) to improve the reliability of transfers from the higher frequency light rail trains, TRAX, to the lower frequency bus services. The CP system examines the status of TRAX tra...

  16. Microprocessors in Systems Engineering at the U.S. Naval Academy.

    ERIC Educational Resources Information Center

    Mitchell, Eugene E., Ed.; Lowe, W. M., Ed.

    1982-01-01

    Describes the introduction of microprocessors into the Weapons and Systems Engineering Department at the U.S. Naval Academy, including planning decisions, implementation, procedures, uses of microprocessors in the department, and impact on the Systems Engineering major and curriculum. (SK)

  17. The technical implementation of an IMPT system for research purpose

    NASA Astrophysics Data System (ADS)

    Nguyen, T. T. C.; Nguyen, B. T.; Mai, N. V.

    2018-03-01

    Because of their superior distribution, proton beams is the state-of-the-art modality in radiation therapy. There is a variety of researchers about proton therapy to utilize it. In this paper, we introduce a Matlab-based platform to develop and prototype proton treatment planning using LAP and CERR. Planning workflow to make an IMPT plan is described in details and demonstrated by a prostate case. The results showed that most of the dose criteria are satisfied, except for bladder and rectum, 2% of the volume of each organ receiving the least dose of 77.5 Gy (RBE) instead of 76 Gy(RBE) as dose requirements suggested by ICRU 78. As a result, planners absolutely can implement Intensity Modulated Proton Therapy plans by LAP and CERR for research purpose.

  18. Using artificial intelligence to automate remittance processing.

    PubMed

    Adams, W T; Snow, G M; Helmick, P M

    1998-06-01

    The consolidated business office of the Allegheny Health Education Research Foundation (AHERF), a large integrated healthcare system based in Pittsburgh, Pennsylvania, sought to improve its cash-related business office activities by implementing an automated remittance processing system that uses artificial intelligence. The goal was to create a completely automated system whereby all monies it processed would be tracked, automatically posted, analyzed, monitored, controlled, and reconciled through a central database. Using a phased approach, the automated payment system has become the central repository for all of the remittances for seven of the hospitals in the AHERF system and has allowed for the complete integration of these hospitals' existing billing systems, document imaging system, and intranet, as well as the new automated payment posting, and electronic cash tracking and reconciling systems. For such new technology, which is designed to bring about major change, factors contributing to the project's success were adequate planning, clearly articulated objectives, marketing, end-user acceptance, and post-implementation plan revision.

  19. Onondaga Lake Watershed – A Geographic Information System Project Phase I – Needs assessment and spatial data framework

    USGS Publications Warehouse

    Freehafer, Douglas A.; Pierson, Oliver

    2004-01-01

    In the fall of 2002, the Onondaga Lake Partnership (OLP) formed a Geographic Information System (GIS) Planning Committee to begin the process of developing a comprehensive watershed geographic information system for Onondaga Lake. The goal of the Onondaga Lake Partnership geographic information system is to integrate the various types of spatial data used for scientific investigations, resource management, and planning and design of improvement projects in the Onondaga Lake Watershed. A needs-assessment survey was conducted and a spatial data framework developed to support the Onondaga Lake Partnership use of geographic information system technology. The design focused on the collection, management, and distribution of spatial data, maps, and internet mapping applications. A geographic information system library of over 100 spatial datasets and metadata links was assembled on the basis of the results of the needs assessment survey. Implementation options were presented, and the Geographic Information System Planning Committee offered recommendations for the management and distribution of spatial data belonging to Onondaga Lake Partnership members. The Onondaga Lake Partnership now has a strong foundation for building a comprehensive geographic information system for the Onondaga Lake watershed. The successful implementation of a geographic information system depends on the Onondaga Lake Partnership’s determination of: (1) the design and plan for a geographic information system, including the applications and spatial data that will be provided and to whom, (2) the level of geographic information system technology to be utilized and funded, and (3) the institutional issues of operation and maintenance of the system.

  20. The Six-District Plan. Integration of the Springfield, Mass., Elementary Schools. A Report of the Massachusetts Advisory Committee to the United States Commission on Civil Rights.

    ERIC Educational Resources Information Center

    Chin, Laura, Ed.

    This report reviews the first year of integration, under the implementation of the Six-District Plan, of the elementary schools in Springfield, Massachusetts. Through this plan the school department changed the racial composition in five previously imbalanced elementary schools and integrated the elementary school system. Redistricting, the…

Top