Sample records for system installation maintenance

  1. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  2. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  3. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  4. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the installation...

  5. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  6. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  7. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...

  8. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  9. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  10. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  11. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  12. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  13. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  14. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  15. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...

  16. Unsurfaced Road Maintenance Management

    DOT National Transportation Integrated Search

    1992-12-01

    This draft manual describes an unsurfaced road maintenance management system for use on military installations. This system is available in either a manual or computerized mode (Micro PAVER). The maintenance standards prescribed should protect Govern...

  17. CERN experience and strategy for the maintenance of cryogenic plants and distribution systems

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.

    2015-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.

  18. Installation package for Hyde Memorial Observatory, Lincoln, Nebraska

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.

  19. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...

  20. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  1. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  2. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  3. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  4. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  5. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...

  6. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  7. System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.

  8. GOES data-collection system instrumentation, installation, and maintenance manual

    USGS Publications Warehouse

    Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.

    1986-01-01

    The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)

  9. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  10. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  11. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  12. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  13. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  14. Operation and maintenance results from ISFOC CPV plants

    NASA Astrophysics Data System (ADS)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  15. Installation package for a solar heating and hot water system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  17. Understanding, Classifying, and Selecting Environmentally Acceptable Hydraulic Fluids

    DTIC Science & Technology

    2016-08-01

    installed in land facilities or off- road vehicles such as excavators, bulldozers, backhoes, etc.), while others are installed on floating plants...and oily bilge tanks for the collection and proper disposal of oil- contaminated bilge water • Performing routine maintenance , including regular...regulations. Maintenance of machinery systems containing EA hydraulic fluids must strictly follow the hydraulic fluid manufacturer’s recommendations

  18. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  19. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  20. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  1. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...

  2. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  3. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  4. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  5. Long-Term Structural Performance Monitoring of Bridges : Hardware Maintenance and, Long-term Data Collection/Analysis

    DOT National Transportation Integrated Search

    2011-06-01

    In this project a description of the maintenance of the sensor monitoring systems installed on three California : highway bridges is presented. The monitoring systems consist of accelerometers, strain gauges, pressure sensors, : and displacement sens...

  6. Long-term structural performance monitoring of bridges : hardware maintenance and, long-term data collection/analysis.

    DOT National Transportation Integrated Search

    2011-06-01

    In this project a description of the maintenance of the sensor monitoring systems installed on three California : highway bridges is presented. The monitoring systems consist of accelerometers, strain gauges, pressure sensors, : and displacement sens...

  7. A Scalable Software Architecture Booting and Configuring Nodes in the Whitney Commodity Computing Testbed

    NASA Technical Reports Server (NTRS)

    Fineberg, Samuel A.; Kutler, Paul (Technical Monitor)

    1997-01-01

    The Whitney project is integrating commodity off-the-shelf PC hardware and software technology to build a parallel supercomputer with hundreds to thousands of nodes. To build such a system, one must have a scalable software model, and the installation and maintenance of the system software must be completely automated. We describe the design of an architecture for booting, installing, and configuring nodes in such a system with particular consideration given to scalability and ease of maintenance. This system has been implemented on a 40-node prototype of Whitney and is to be used on the 500 processor Whitney system to be built in 1998.

  8. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  9. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  10. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  11. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  12. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  13. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  14. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  15. North American Board of Certified Energy Practitioners Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, Richard

    The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of allmore » five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.« less

  16. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  17. System administrator`s guide to CDPS. Version 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Didier, B.T.; Portwood, M.H.

    The System Administrator`s Guide to CDPS is intended for those responsible for setting up and maintaining the hardware and software of a Common Mapping Standard (CMS) Date Production System (CDPS) installation. This guide assists the system administrator in performing typical administrative functions. It is not intended to replace the Ultrix Documentation Set that should be available for a DCPS installation. The Ultrix Documentation Set will be required to provide details on referenced Ultrix commands as well as procedures for performing Ultrix maintenance functions. There are six major sections in this guide. Section 1 introduces the system administrator to CDPS andmore » describes the assumptions that are made by this guide. Section 2 describes the CDPS platform configuration. Section 3 describes the platform preparation that is required to install the CDPS software. Section 4 describes the CPS software and its installation procedures. Section 5 describes the CDS software and its installation procedures. Section 6 describes various operation and maintenance procedures. Four appendices are also provided. Appendix A contains a list of used acronyms. Appendix B provides a terse description of common Ultrix commands that are used in administrative functions. Appendix C provides sample CPS and CDS configuration files. Appendix D provides a required list and a recommended list of Ultrix software subsets for installation on a CDPS platform.« less

  18. Installation package for SIMS prototype system 2, solar hot water

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The prototype system 2 solar hot water was designed for use in a single family dwelling and consists of the following subsystems: collector, storage, energy transport, and control. Guidelines are presented for utilization in the development of detailed installation plans and specifications. Instruction on operation, maintenance, and repair of the system is discussed.

  19. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  20. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  1. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...

  2. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  3. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  4. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  5. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  6. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  7. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  8. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  9. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  10. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...

  11. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...

  12. 40 CFR 142.307 - What terms and conditions must be included in a small system variance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that may affect proper and effective operation and maintenance of the technology; (2) Monitoring... effective installation, operation and maintenance of the applicable small system variance technology in... health, which may include: (i) Public education requirements; and (ii) Source water protection...

  13. AUTOMOTIVE DIESEL MAINTENACE 1. UNIT XV, I--MAINTAINING THE COOLING SYSTEM, CUMMINS DIESEL ENGINE, I--UNIT INSTALLATION--TRANSMISSION.

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE FUNCTION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM AND THE PROCEDURES FOR TRANSMISSION INSTALLATION. TOPICS ARE (1) IMPORTANCE OF THE COOLING SYSTEM, (2) COOLING SYSTEM COMPONENTS, (3) EVALUATING COOLING SYSTEM FAILURES, (4) CARING FOR THE COOLING SYSTEM,…

  14. 46 CFR 181.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  15. Crime Prevention in Schools: Specification, Installation, and Maintenance of Intruder Alarm Systems. Building Bulletin 69.

    ERIC Educational Resources Information Center

    Haworth-Roberts, A., Ed.

    Greater use of expensive equipment by schools has also increased the potential for vandalism and theft, giving an increased role to intruder alarm systems. This document provides guidance on the management and technical aspects of forming policies for installing and operating intruder alarm systems in educational buildings. Also provided are…

  16. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength andmore » stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation.« less

  17. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  18. Method and apparatus for energy efficient self-aeration in chemical, biochemical, and wastewater treatment processes

    DOEpatents

    Gao, Johnway [Richland, WA; Skeen, Rodney S [Pendleton, OR

    2002-05-28

    The present invention is a pulse spilling self-aerator (PSSA) that has the potential to greatly lower the installation, operation, and maintenance cost associated with aerating and mixing aqueous solutions. Currently, large quantities of low-pressure air are required in aeration systems to support many biochemical production processes and wastewater treatment plants. Oxygen is traditionally supplied and mixed by a compressor or blower and a mechanical agitator. These systems have high-energy requirements and high installation and maintenance costs. The PSSA provides a mixing and aeration capability that can increase operational efficiency and reduce overall cost.

  19. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  20. Professional Certification

    EPA Pesticide Factsheets

    WaterSense recognizes certification programs for irrigation professionals that meet the specification criteria. Certification programs cover three areas: irrigation system design, installation and maintenance, and system auditing.

  1. 40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each pH measurement device, you must meet the... integrity and all electrical connections for continuity. (e) For each bag leak detection system, you must... leak detection system must be installed, calibrated, operated, and maintained according to the “Fabric...

  2. 46 CFR 118.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  3. 46 CFR 118.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  4. 41 CFR 102-33.170 - What standards must we establish or require (contractually, where applicable) for maintenance of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... appliance repairs, modifications, or equipment installations. (e) A quality control system for acquiring... tracking maintenance actions; inspections; and the flight hours, cycles, and calendar times of life-limited...

  5. Laboratory services series: a master-slave manipulator maintenance program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenness, R. G.; Hicks, R. E.; Wicker, C. D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance.

  6. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  7. Development of a Navy Job-Specific Vocational Interest Model

    DTIC Science & Technology

    2006-12-01

    Enforcement Air Systems Installation/Repair Maritime Interests Applied Mathematics Media Arts Aviation Interests Medical and Dental Services...Technician (AS) 9. Aviation Electronics Technician (AT) 10. Aviation Maintenance Administrationman (AZ) 11. Culinary Specialist (CS) 12. Cryptologic...equipment. 90. Perform preventive and corrective maintenance on state-of-the- art electronic and electromechanical equipment and systems, requiring

  8. Solar heating and domestic hot water system installed at North Dallas High School

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  9. Carpeting/Flooring: Revitalizing Carpets.

    ERIC Educational Resources Information Center

    Woolford, Alison; Hill, Michael

    2003-01-01

    With properly specified fiber and a comprehensive maintenance program, school carpets can retain their appearance longer. Discusses carpet characteristics; proper carpet installation; effective preventive-maintenance programs (keep outside areas clean, use soil barriers, protect desk areas, maintain HVAC systems, and specify eating, drinking, and…

  10. Solar hot water space heating system. Technical progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Dam, T

    1979-08-13

    A retrofit solar heating system was installed on Madison Hall at Jordan College, Cedar Springs, Michigan. The system provides heating and domestic water preheating for a campus dormitory. Freeze protection is provided by a draindown system. The building and solar system, construction progress, and design changes are described. Included in appendices are: condensate trap design, structural analysis, pictures of installation, operating instructions, maintenance instructions, and as-built drawings. (MHR)

  11. High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, L.E.; McGuire, D.R.

    1984-05-01

    This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less

  12. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tolerance of 1.27 centimeters of water or a transducer with a minimum tolerance of 1 percent of the pressure... use a fabric filter bag leak detection system to comply with the requirements of this subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as specified in...

  13. Solar-energy landmark Building-Columbia, Missouri

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report includes design, cost, installation, maintenance, and performance details for attractive solar installation which supplies space heating for four-story Visitors Center. 176 hydronic flat-plate collectors, water-to-water heat exchanger, and 5,000-gallon storage tank comprise system which provides 71 percent of building's heat. Natural-gas-fired boiler supplies auxiliary hot water to heating system when necessary.

  14. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  15. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  16. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  17. 49 CFR 236.26 - Buffing device, maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions... be maintained so as not to cause the signal to display a less restrictive aspect than intended. Track...

  18. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  19. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  20. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  1. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  2. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  3. Installation package for integrated programmable electronic controller and hydronic subsystem - solar heating and cooling

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A description is given of the Installation, Operation, and Maintenance Manual and information on the power panel and programmable microprocessor, a hydronic solar pump system and a hydronic heating hot water pumping system. These systems are integrated into various configurations for usages in solar energy management, control and monitoring, lighting control, data logging and other solar related applications.

  4. Computer Associates International, CA-ACF2/VM Release 3.1

    DTIC Science & Technology

    1987-09-09

    Associates CA-ACF2/VM Bibliography International Business Machines Corporation, IBM Virtual Machine/Directory Maintenance Program Logic Manual...publication number LY20-0889 International Business Machines International Business Machines Corporation, IBM System/370 Principles of Operation...publication number GA22-7000 International Business Machines Corporation, IBM Virtual Machine/Directory Maintenance Installation and System Administrator’s

  5. Prototype solar heating and combined heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Eight prototype solar heating and combined heating and cooling systems are considered. This effort includes development, manufacture, test, installation, maintenance, problem resolution, and performance evaluation.

  6. Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenness, R.G.; Wicker, C.D.

    1975-01-01

    The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer- programmed maintenance system has been established at the Laboratory. (auth)

  7. Prototype solar-heated hot water systems and double-walled heat exchangers

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Development progress made on two solar-heated hot water systems and two heat exchangers is reported. The development, manufacture, installation, maintenance, problem resolution, and system evaluation are described.

  8. Prototype solar heating and combined heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Eight prototype solar heating and combined heating and cooling systems are being developed. The effort includes development, manufacture, test, installation, maintenance, problem resolution, and performance evaluation.

  9. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...

  10. Prototype solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Eight prototype systems were developed. The systems are 3, 25, and 75-ton size units. The manufacture, test, installation, maintenance, problem resolution, and performance evaluation of the systems is described. Size activities for the various systems are included.

  11. Implementation guidelines for road weather information systems

    DOT National Transportation Integrated Search

    1997-11-01

    The report presents guidelines for implementing road weather information systems (RWIS). These guidelines will assist highway agency personnel with the planning, installation, and maintenance of road weather information systems for either ice or high...

  12. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XVII, I--MAINTAINING THE LUBRICATION SYSTEM--CUMMINS DIESEL ENGINE, II--UNIT INSTALLATION AND REMOVAL--DRIVE LINES.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…

  13. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  14. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  15. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  16. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  17. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  18. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  19. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...

  20. WOGEN. Work Order Generation Macros for Word Perfect 6.X for Windows

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grenz, G.

    Included are three general WP macros (two independent and one multiple) and a template used at the Test Reactor Area (TRA) for the generation of the Work Orders (WO`s) used to perform corrective and preventative maintenance, as well as modifications of existing systems and installation of new systems. They incorporate facility specific requirements as well as selected federal/state orders. These macros are used to generate a WP document which is then converted into ASCII text for import to the maintenance software. Currently we are using MCRS but should be compatible with other platforms such as Passport. Reference the included filemore » Wogen.txt for installation and usage instructions.« less

  1. Work Order Generation Macros for Word Perfect 6.X for Windows

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grenz, Gordon G.

    Included are three general WP macros (two independent and one multiple) and a template used at the Test Reactor Area (TRA) for the generation of the Work Orders (WO's) used to perform corrective and preventative maintenance, as well as modifications of existing systems and installation of new systems. They incorporate facility specific requirements as well as selected federal/state orders. These macros are used to generate a WP document which is then converted into ASCII text for import to the maintenance software. Currently we are using MCRS but should be compatible with other platforms such as Passport. Reference the included filemore » Wogen.txt for installation and usage instructions.« less

  2. Evaluation of Vehicle Detection Systems for Traffic Signal Operations

    DOT National Transportation Integrated Search

    2016-10-16

    Typical vehicle detection systems used in traffic signal operations are comprised of inductive loop detectors. Because of costs, installation challenges, and operation and maintenance issues, many alternative non-intrusive systems have been dev...

  3. Linac cryogenic distribution system maintenance and upgrades at JLab

    NASA Astrophysics Data System (ADS)

    Dixon, K.; Wright, M.; Ganni, V.

    2014-01-01

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm3 of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  4. Solar space and water heating system installed at Charlottesville, Virginia

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  5. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

  6. The Vendors' Corner: Biblio-Techniques' Library and Information System (BLIS).

    ERIC Educational Resources Information Center

    Library Software Review, 1984

    1984-01-01

    Describes online catalog and integrated library computer system designed to enhance Washington Library Network's software. Highlights include system components; implementation options; system features (integrated library functions, database design, system management facilities); support services (installation and training, software maintenance and…

  7. 49 CFR 236.529 - Roadway element inductor; height and distance from rail.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...

  8. 49 CFR 236.529 - Roadway element inductor; height and distance from rail.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...

  9. 49 CFR 236.202 - Signal governing movements over hand-operated switch.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.202 Signal governing movements over hand...

  10. Feasibility study of a 270V dc flat cable aircraft electrical power distributed system

    NASA Astrophysics Data System (ADS)

    Musga, M. J.; Rinehart, R. J.

    1982-01-01

    This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.

  11. 49 CFR 236.204 - Track signaled for movements in both directions, requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...

  12. 49 CFR 236.204 - Track signaled for movements in both directions, requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...

  13. 49 CFR 236.577 - Test, acknowledgement, and cut-in circuits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Roadway § 236.577 Test...

  14. 49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...

  15. 49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...

  16. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  17. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  18. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  19. 49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...

  20. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...

  1. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...

  2. Project SAGE: solar assisted gas energy. Final report and executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less

  3. Rapid Transit Subways - Maintenance Guidelines for Engineering New Installations for Reduced Maintenance

    DOT National Transportation Integrated Search

    1978-01-01

    Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...

  4. Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meador, Richard J.; Hatley, Darrel D.

    2004-03-18

    Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less

  5. Prototype solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A collection of monthly status reports on the development of eight prototype solar heating and cooling systems is presented. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3, 25, and 75 ton size units.

  6. Prototype solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A collection of monthly status reports are given on the development of eight prototype solar heating and cooling systems. This effort calls for the development, manufacturing, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3-, 25-, and 75-ton size units.

  7. 48 CFR 9.501 - Definition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...

  8. 48 CFR 9.501 - Definition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...

  9. 48 CFR 9.501 - Definition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...

  10. 48 CFR 9.501 - Definition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...

  11. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  12. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  13. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  14. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  15. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  16. Design data brochure: SIMS prototype system 2

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Information is provided on the design and performance of the IBM SIMS Prototype System 2, solar domestic hot water system, for single family residences. The document provides sufficient data to permit procurement, installation, operation, and maintenance by qualified architectural engineers or contractors.

  17. Installation package maxi-therm S-101 heating module

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.

  18. 49 CFR 236.514 - Interconnection of cab signal system with roadway signal system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.514 Interconnection of cab signal system with roadway signal system. The automatic cab signal system shall be...

  19. Irrigation Controllers

    EPA Pesticide Factsheets

    With proper installation, programming, and maintenance, homeowners and businesses can use WaterSense labeled controllers instead of standard clock-timer controllers on their existing systems, and no longer worry about wasted water.

  20. Weigh-in-Motion systems evaluation : final report.

    DOT National Transportation Integrated Search

    1976-04-01

    This relatively short-term project was initiated in order to perfect installation, operation, and maintenance practices necessary for continued accurate and reliable operation of a computerized Weigh-in-Motion system which will be used to gather truc...

  1. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  2. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  3. The Architect's Guide to Mechanical Systems.

    ERIC Educational Resources Information Center

    Andrews, F. T.

    The principles and problems of designing new building mechanical systems are discussed in this reference source in the light of data on the functions and operation of mechanical systems. As a practical guide to understanding mechanical systems it describes system types, functions, space requirements, weights, installation, maintenance and…

  4. 40 CFR 610.23 - Operator interaction effects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...

  5. Natural Bridges National Monument photovoltaic power plant operations manual

    NASA Astrophysics Data System (ADS)

    Coleman, S. D.

    1982-02-01

    After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.

  6. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of railroads. Roadbeds and all elements of the railroad tracks shall be designed, installed, and maintained to provide...

  7. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  8. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  9. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  10. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  11. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  12. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  13. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  14. Installation, care, and maintenance of wood shake and shingle siding

    Treesearch

    Jack Dwyer; Tony Bonura; Arnie Nebelsick; Sam Williams; Christopher G. Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shakes and shingles. The authors gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle siding, and interviews with experts having...

  15. Prototype solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A combination of monthly progress reports are presented. It contains a summary of activities and progress made from November 1, 1978, to February 28, 1979. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation.

  16. 49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...

  17. 49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...

  18. 49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...

  19. Utilization of available skills and materials in fire prevention

    NASA Technical Reports Server (NTRS)

    Martin, H. W.

    1971-01-01

    Procedures for installing fire protection systems in large buildings are discussed. Factors considered in the safety management are: (1) distribution of water supply, (2) design and location of exits, (3) emergency power system, and (4) maintenance procedures.

  20. 49 CFR 236.504 - Operation interconnected with automatic block-signal system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.504... or train control system shall operate in connection with an automatic block signal system and shall...

  1. 49 CFR 236.514 - Interconnection of cab signal system with roadway signal system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Interconnection of cab signal system with roadway signal system. 236.514 Section 236.514 Transportation Other Regulations Relating to Transportation... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES...

  2. Solar domestic hot water system installed at Texas City, Texas

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This is the final technical report of the solar energy system located at LaQuinta Motor Inn, Texas City, Texas. The system was designed to supply 63 percent of the total hot water load for a new 98 unit motor inn. The solar energy system consists of a 2100 square feet Raypack liquid flat plate collector subsystem and a 2500 gallon storage subsystem circulating hot water producing 3.67 x 10 to the 8th power Btu/year. Abstracts from the site files, specification references, drawings, installation, operation, and maintenance instructions are included.

  3. The influence of maintenance quality of hemodialysis machines on hemodialysis efficiency.

    PubMed

    Azar, Ahmad Taher

    2009-01-01

    Several studies suggest that there is a correlation between dose of dialysis and machine maintenance. However, in spite of the current practice, there are conflicting reports regarding the relationship between dose of dialysis or patient outcome, and machine maintenance. In order to evaluate the impact of hemodialysis machine maintenance on dialysis adequacy Kt/V and session performance, data were processed on 134 patients on 3-times-per-week dialysis regimens by dividing the patients into four groups and also dividing the hemodialysis machines into four groups according to their year of installation. The equilibrated dialysis dose eq Kt/V, urea reduction ratio (URR) and the overall equipment effectiveness (OEE) were calculated in each group to show the effect hemodialysis machine efficiency on the overall session performance. The average working time per machine per month was 270 hours. The cumulative number of hours according to the year of installation was: 26,122 hours for machines installed in 1998; 21,596 hours for machines installed in 1999, 8362 hours for those installed in 2003 and 2486 hours for those installed in 2005. The mean time between failures (MTBF) was 1.8, 2.1, 4.2 and 6 months between failures for machines installed in 1999, 1998, 2003 and 2005, respectively. Statistical analysis demonstrated that the dialysis dose eq Kt/V and URR were increased as the overall equipment effectiveness (OEE) increases with regular maintenance procedures. Maintenance has become one of the most expedient approaches to guarantee high machine dependability. The efficiency of dialysis machine is relevant in assuring a proper dialysis adequacy.

  4. Sensor4PRI: A Sensor Platform for the Protection of Railway Infrastructures

    PubMed Central

    Cañete, Eduardo; Chen, Jaime; Díaz, Manuel; Llopis, Luis; Rubio, Bartolomé

    2015-01-01

    Wireless Sensor Networks constitute pervasive and distributed computing systems and are potentially one of the most important technologies of this century. They have been specifically identified as a good candidate to become an integral part of the protection of critical infrastructures. In this paper we focus on railway infrastructure protection and we present the details of a sensor platform designed to be integrated into a slab track system in order to carry out both installation and maintenance monitoring activities. In the installation phase, the platform helps operators to install the slab tracks in the right position. In the maintenance phase, the platform collects information about the structural health and behavior of the infrastructure when a train travels along it and relays the readings to a base station. The base station uses trains as data mules to upload the information to the internet. The use of a train as a data mule is especially suitable for collecting information from remote or inaccessible places which do not have a direct connection to the internet and require less network infrastructure. The overall aim of the system is to deploy a permanent economically viable monitoring system to improve the safety of railway infrastructures. PMID:25734648

  5. 14 CFR 23.1103 - Induction system ducts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... withstanding the effects of temperature extremes, fuel, oil, water, and solvents to which it is expected to be exposed in service and maintenance without hazardous deterioration or delamination. (d) For reciprocating engine installations, each induction system duct must be— (1) Strong enough to prevent induction system...

  6. 14 CFR 23.1103 - Induction system ducts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... withstanding the effects of temperature extremes, fuel, oil, water, and solvents to which it is expected to be exposed in service and maintenance without hazardous deterioration or delamination. (d) For reciprocating engine installations, each induction system duct must be— (1) Strong enough to prevent induction system...

  7. 14 CFR 23.1103 - Induction system ducts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... withstanding the effects of temperature extremes, fuel, oil, water, and solvents to which it is expected to be exposed in service and maintenance without hazardous deterioration or delamination. (d) For reciprocating engine installations, each induction system duct must be— (1) Strong enough to prevent induction system...

  8. 14 CFR 23.1103 - Induction system ducts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... withstanding the effects of temperature extremes, fuel, oil, water, and solvents to which it is expected to be exposed in service and maintenance without hazardous deterioration or delamination. (d) For reciprocating engine installations, each induction system duct must be— (1) Strong enough to prevent induction system...

  9. 14 CFR 23.1103 - Induction system ducts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... withstanding the effects of temperature extremes, fuel, oil, water, and solvents to which it is expected to be exposed in service and maintenance without hazardous deterioration or delamination. (d) For reciprocating engine installations, each induction system duct must be— (1) Strong enough to prevent induction system...

  10. 49 CFR 236.1041 - Training and qualification program, general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1041 Training and qualification program, general. (a) Training program...-critical elements of the railroad's PTC systems, including central office, wayside, or onboard subsystems...

  11. Investigation of pump and pump switch failures in rainwater harvesting systems

    NASA Astrophysics Data System (ADS)

    Moglia, Magnus; Gan, Kein; Delbridge, Nathan; Sharma, Ashok K.; Tjandraatmadja, Grace

    2016-07-01

    Rainwater harvesting is an important technology in cities that can contribute to a number of functions, such as sustainable water management in the face of demand growth and drought as well as the detention of rainwater to increase flood protection and reduce damage to waterways. The objective of this article is to investigate the integrity of residential rainwater harvesting systems, drawing on the results of the field inspection of 417 rainwater systems across Melbourne that was combined with a survey of householders' situation, maintenance behaviour and attitudes. Specifically, the study moves beyond the assumption that rainwater systems are always operational and functional and draws on the collected data to explore the various reasons and rates of failure associated with pumps and pump switches, leaving for later further exploration of the failure in other components such as the collection area, gutters, tank, and overflows. To the best of the authors' knowledge, there is no data like this in academic literature or in the water sector. Straightforward Bayesian Network models were constructed in order to analyse the factors contributing to various types of failures, including system age, type of use, the reason for installation, installer, and maintenance behaviour. Results show that a number of issues commonly exist, such as failure of pumps (5% of systems), automatic pump switches that mediate between the tank and reticulated water (9% of systems), and systems with inadequate setups (i.e. no pump) limiting their use. In conclusion, there appears to be a lack of enforcement or quality controls in both installation practices by sometimes unskilled contractors and lack of ongoing maintenance checks. Mechanisms for quality control and asset management are required, but difficult to promote or enforce. Further work is needed into how privately owned assets that have public benefits could be better managed.

  12. Purchasing and Selecting School Lighting.

    ERIC Educational Resources Information Center

    Berman, Tim

    2003-01-01

    Discusses factors for schools to consider when deciding on a lighting system: purchase price, installation charges, maintenance costs, energy costs, and ensuring optimal educational environment. Presents best practices in these areas. (EV)

  13. 30 CFR 77.516 - Electric wiring and equipment; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric wiring and equipment; installation and... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.516 Electric wiring and equipment; installation and maintenance. In addition to the requirements of §§ 77.503 and 77.506, all wiring and...

  14. Installation, care, and maintenance of wood shake and shingle roofs

    Treesearch

    Tony Bonura; Jack Dwyer; Arnie Nebelsick; Brent Stuart; R. Sam Williams; Christopher Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shake and shingle roofs. The authors have gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle roofs, and interviews with experts having...

  15. Solar heating and hot water system installed at James Hurst Elementary School, Portsmouth, Virginia

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Solar heating and a hot water system installed in an elementary school in Portsmouth, Virginia are examined. The building is zoned into four heating/cooling areas. Each area is equipped with an air handling unit that is monitored and controlled by central control and monitoring system. The solar system for the building uses a collector area of 3,630 sq. ft. of flat plate liquid collectors, and a 6,000 gallon storage tank. System descriptions, maintenance reports, detailed component specifications, and design drawings to evaluate this solar system are reported.

  16. Avionics Instrument Systems Specialist Career Ladder: AFSCs 32531, 32551, 31571, and 32591. Occupational Survey Report.

    ERIC Educational Resources Information Center

    Air Force Occupational Measurement Center, Lackland AFB, TX.

    The Avionics Instrument Systems career ladder (AFSC 325X1) provides flight line and shop maintenance training on aircraft instrument systems, electromechancial instruments, components, and test equipment. Duties involve inspecting, removing, installing, repairing, operating, troubleshooting, overhauling, and modifying systems such as flight and…

  17. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  18. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  19. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  20. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  1. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  2. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  3. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  4. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  5. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  6. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  7. Guidelines for the Development and Implementation of a Logistic Resource. Annex to the Five Year Defense Program. Volume 1. The DoD LRA System

    DTIC Science & Technology

    1978-10-01

    GRC used allocation methods to determine data for below installation level maintenance, supply, and transportation ; IDA focused on programmed... data systusm or for which some difficulty is expected in obtaining useful data . These areas are: * Below-depot maintenance, supply and transportation ...VAMOSC . . . . . . . . .65 B. Terminology . . . . . . . . . . . . 67 1C Dirferences Between the LRA and VAMOSC . .T8 D. Use of Existing Data Systems

  8. Window-mounted auxiliary solar heater

    NASA Technical Reports Server (NTRS)

    Anthony, K. G.; Herndon, E. P.

    1977-01-01

    System uses hot-air collectors, no thermal storage, and fan with thermostat switches. At cost of heating efficiency, unit could be manufactured and sold at price allowing immediate entry to market as auxiliary heating system. Its simplicity allows homeowner installation, and maintenance is minimal.

  9. Renewable energy water supply - Mexico program summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foster, R.

    1997-12-01

    This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importancemore » of training. It also presents much collected data as to the characteristics and performance of the installed systems.« less

  10. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  11. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  12. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  13. A novel smart lighting clinical testbed.

    PubMed

    Gleason, Joseph D; Oishi, Meeko; Simkulet, Michelle; Tuzikas, Arunas; Brown, Lee K; Brueck, S R J; Karlicek, Robert F

    2017-07-01

    A real-time, feedback-capable, variable spectrum lighting system was recently installed at the University of New Mexico Hospital to facilitate biomedical research on the health impacts of lighting. The system consists of variable spectrum troffers, color sensors, occupancy sensors, and computing and communication infrastructure, and is the only such clinical facility in the US. The clinical environment posed special challenges for installation as well as for ongoing maintenance and operations. Pilot studies are currently underway to evaluate the effectiveness of the system to regulate circadian phase in subjects with delayed sleep-wake phase disorder.

  14. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  15. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  16. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  17. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  18. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    A collection of quarterly and monthly reports from Elcam, Inc., covering progress made from January 1, 1978, through September 30, 1978, is presented. Elcam, is developing two solar-heated hot water prototype systems and two heat exchangers. This effort consists of development, manufacture, installation, maintenance, problem resolution, and system evaluation.

  20. CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.F. Loros

    2000-06-28

    The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installingmore » the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.« less

  1. 75 FR 50854 - Airworthiness Directives; The Boeing Company Model 767-300 Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... and installing a tetrafluoroethylene (TFE 2X) sleeve. This AD results from fuel system reviews... for fuel tank systems. As a result of those findings, we issued a regulation titled ``Transport Airplane Fuel Tank System Design Review, Flammability Reduction and Maintenance and Inspection Requirements...

  2. 49 CFR 236.511 - Cab signals controlled in accordance with block conditions stopping distance in advance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... automatic cab signal system shall be arranged so that cab signals will be continuously controlled in...

  3. Solar heating system installed at Telex Communications, Inc., Blue Earth, Minnesota

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The solar heating system for space heating a 97,000 square foot building which houses administrative offices, assembly areas, and warehouse space is summarized. Information on system description, test data, major problems and resolutions, performance, operation and maintenance manual, manufacturer's literature, and as-built drawings is presented.

  4. Diagnosing Trouble Spots Caused by an Irrigation System

    Treesearch

    John R. Scholtes

    2002-01-01

    I discuss a testing procedure to determine the water distribution pattern of a sprinkler irrigation system and steps that may be taken to improve uniformity of application. All irrigation systems require testing and maintenance to assure that water application is as uniform as possible. Even new systems installed to a manufacturer's specifications should be "...

  5. Fibre optic portable rail vehicle detector

    NASA Astrophysics Data System (ADS)

    Kepak, Stanislav; Cubik, Jakub; Zavodny, Petr; Hejduk, Stanislav; Nedoma, Jan; Davidson, Alan; Vasinek, Vladimir

    2016-12-01

    During track maintenance operations, the early detection of oncoming rail vehicles is critical for the safety of maintenance personnel. In addition, the detection system should be simple to install at the trackside by minimally qualified personnel. Fibre optic based sensor systems have the inherent advantages of being passive, unaffected by radio frequency interference (RFI) and suffering very low signal attenuation. Such a system therefore represents a good alternative to conventional approaches such as ultrasonic based sensor systems. The proposed system consists of one or more passive fibre trackside sensors and an x86 processing unit located at the work site. The solid fibre connection between sensors and processing unit eliminates the risk of RFI. In addition, the detection system sensors are easy to install with no requirement for electrical power at the sensor site. The system was tested on a tram line in Ostrava with the results obtained indicating the successful detection of all the trams in the monitoring windows using a single sensor. However, the platform allows flexibility in configuring multiple sensors where required by system users.

  6. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  7. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  8. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  9. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  10. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  11. 49 CFR 236.921 - Training and qualification program, general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.921 Training and qualification program..., wayside, or onboard subsystems; (2) Persons who dispatch train operations (issue or communicate any...

  12. Yuma Border Patrol Lighting Retrofit: Final LED System Performance Assessment of Trial and Full Installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilkerson, Andrea; Sullivan, Gregory P.; Davis, Robert G.

    Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial evaluation in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations, and illuminance measurements were recorded initially and at 2500 hours, 5000 hours, 7000, and 11,000 hours of operation. Additionally, four second-generation LED luminaires installed as part of the full installation were evaluated initially and again after 4,000 hours of operation. While the initial energy, lighting quality, and maintenance benefits relative to the incumbent high-pressure sodium system were very satisfactory, the study raises important questions regarding themore » long-term performance of LED lighting systems in high-temperature environments.« less

  13. Installation guidelines for solar heating system, single-family residence at William OBrien State Park, Stillwater, Minnesota

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.

  14. Implementation of the National Intelligent Transportation Systems Program : 1996 report to Congress

    DOT National Transportation Integrated Search

    2003-01-01

    This pocket guide is intended for use by state and local transportation officials, manufacturing and engineering organizations, university transportation professionals, and others responsible for the design, selection, installation, and maintenance o...

  15. View of STS-134 Crew Members during EVA-1

    NASA Image and Video Library

    2011-05-20

    S134-E-009265 (20 May 2011) --- NASA astronauts Andrew Feustel (right) and Greg Chamitoff, both STS-134 mission specialists, participate in the mission's first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 19-minute spacewalk, Feustel and Chamitoff retrieved long-duration materials exposure experiments and installed another, installed a light on one of the station?s rail line handcarts, made preparations for adding ammonia to a cooling loop and installed an antenna for the External Wireless Communication system. The newly-installed Alpha Magnetic Spectrometer-2 (AMS) is at center frame. Photo credit: NASA

  16. View of STS-134 Crew Members during EVA-1

    NASA Image and Video Library

    2011-05-20

    S134-E-009267 (20 May 2011) --- NASA astronauts Andrew Feustel (right) and Greg Chamitoff, both STS-134 mission specialists, participate in the mission's first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 19-minute spacewalk, Feustel and Chamitoff retrieved long-duration materials exposure experiments and installed another, installed a light on one of the station?s rail line handcarts, made preparations for adding ammonia to a cooling loop and installed an antenna for the External Wireless Communication system. The newly-installed Alpha Magnetic Spectrometer-2 (AMS) is at lower center frame. Photo credit: NASA

  17. Preliminary design package for maxi-therm heat exchanger module

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Heat exchangers were developed for use in a solar heating and cooling system installed in a single family dwelling. Each of the three exchangers consisted of a heating and cooling module and a submersed electric water heating element. Information necessary to evaluate the preliminary design of the heat exchanger is presented in terms of the development and verification plans, performance specifications, installation and maintenance, and hazard analysis.

  18. Rapid Transit Subways - Guidelines for Engineering New Installations for Reduced Maintenance

    DOT National Transportation Integrated Search

    1978-01-01

    Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...

  19. 49 CFR 236.534 - Entrance to equipped territory; requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.534... not exceed restricted speed, the automatic train stop, train control, or cab signal device shall be...

  20. 49 CFR 236.534 - Entrance to equipped territory; requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.534... not exceed restricted speed, the automatic train stop, train control, or cab signal device shall be...

  1. Utilitiesman 3 and 2. Rate Training Manual. Revised 1973.

    ERIC Educational Resources Information Center

    Naval Training Command, Pensacola, FL.

    This Rate Training Manual provides the technical knowledge and skill requirements necessary to prepare Utilitiesmen to perform tasks involved in the installation, maintenance, and repair of plumbing, heating, steam, fuel storage and distribution systems, water treatment and distribution systems, air conditioning and refrigeration equipment, and…

  2. Energy Control Systems: Energy Savings.

    ERIC Educational Resources Information Center

    School Business Affairs, 1980

    1980-01-01

    The installation of proper control systems is estimated as saving up to 25 percent of the energy used in schools. Other potential energy-saving areas are transmission (heat loss or gain through walls, especially ceilings); internal load (heat from students, lights, and machinery); ventilation; and equipment maintenance. (Author/MLF)

  3. Acoustic and other factors relating to the use of sound field systems in classrooms

    NASA Astrophysics Data System (ADS)

    Carey, Anne; Shield, Bridget; Dockrell, Julie; Rigby, Kate

    2005-04-01

    A study has been made of thirty-five primary school classrooms which have Sound Field Systems (SFS) installed. Acoustic surveys of the classrooms have been undertaken and detailed observations made of the physical characteristics of each room such as its construction and design, plus any acoustic treatment. The positioning and type, e.g., column or separate speakers, of SFS installed were also noted. Details of the procedures for purchasing, installing, and maintaining the SFS were obtained where possible, together with information concerning training of teachers in their use. Results from these surveys suggest that in many cases SFS are installed in rooms where their performance may be compromised because of inadequate acoustic conditions. Additionally problems may arise due to inappropriate installation, choice of system, poor maintenance, or lack of training. The effectiveness of acoustic treatment such as absorption applied to ceilings and walls has also been investigated in a range of classrooms and its impact on the use of SFS considered.

  4. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The development of eight prototype solar heating and combined heating and cooling systems is reported. Manufacture, test, installation, maintenance, problem resolution, and monitoring the operation of prototype systems is included. Heating and cooling equipment for single family residential and commercial applications and eight operational test sites (four heating and four heating and cooling) is described.

  5. 49 CFR 236.567 - Restrictions imposed when device fails and/or is cut out en route.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions... restricted speed or if an automatic block signal system is in operation according to signal indication but...

  6. Prototype solar heated hot water systems and double-walled heat exchangers: A collection of quarterly reports

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The plan schedule and status of multiple objectives to be achieved in the development, manufacture, installation, and maintenance of two solar heated hot water prototype systems and two heat exchangers are reported. A computer program developed to resolve problems and evaluate system performance is described.

  7. New concept for a general purpose subsea installation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Citi, G.; Cowen, S.; Radicioni, A.

    1996-12-31

    The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehiclemore » that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.« less

  8. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  9. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  10. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  11. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  12. 40 CFR 63.8242 - What are the installation, operation, and maintenance requirements for my continuous monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...

  13. Phase I development of an aesthetic, precast concrete bridge rail.

    DOT National Transportation Integrated Search

    2012-02-01

    Precast concrete bridge rail systems offer several advantages over traditional cast-in-place rail designs, including reduced construction : time and costs, installation in a wide range of environmental conditions, easier maintenance and repair, impro...

  14. GATEWAY Demonstrations: Long-Term Evaluation of SSL Field Performance in Select Interior Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, Tess E.; Davis, Robert G.; Wilkerson, Andrea M.

    The GATEWAY program evaluated the long-term performance characteristics (chromaticity change, maintained illuminance, and operations and maintenance) of LED lighting systems in four field installations previously documented in separate DOE GATEWAY reports.

  15. The Alaska experience

    NASA Technical Reports Server (NTRS)

    Mutter, D. L.

    1981-01-01

    The management responsibilities of the Alaska Department of Natural Resources are summarized and the establishment of a geoprocessor system is described. Specific capabilities were defined based on surveys of potential users and pre-existing systems. The procurement process, the initially purchased equipment, and system upgrading are described. Cost, installation and maintenance, site location, training, and staffing of the system are examined.

  16. The Alaska experience

    NASA Astrophysics Data System (ADS)

    Mutter, D. L.

    1981-09-01

    The management responsibilities of the Alaska Department of Natural Resources are summarized and the establishment of a geoprocessor system is described. Specific capabilities were defined based on surveys of potential users and pre-existing systems. The procurement process, the initially purchased equipment, and system upgrading are described. Cost, installation and maintenance, site location, training, and staffing of the system are examined.

  17. El Toro Library Solar Heating and Cooling Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is divided into a number of essentially independent sections, each of which covers a specific topic. The sections, and the topics covered, are as follows. Section 1 provides a brief summary description of the solar energy heating and cooling system including the key final design parameters. Section 2 contains a copy of the final Acceptance Test Report. Section 3 consists of a reduced set of final updated as-built mechanical, electrical, control and instrumentations drawings of the solar energy heating and cooling system. Section 4 provides a summary of system maintenance requirements, in the form of a maintenance schedulemore » which lists necessary maintenance tasks to be performed at monthly, quarterly, semi-annual, and annual intervals. Section 5 contains a series of photographs of the final solar energy system installation, including the collector field and the mechanical equipment room. Section 6 provides a concise summary of system operation and performance for the period of December 1981 through June 1982, as measured, computed and reported by Vitro Laboratories Division of Automation Industries, Inc., for the DOE National Solar Data Network. Section 7 provides a summary of key as-built design parameters, compared with the corresponding original design concept parameters. Section 8 provides a description of a series of significant problems encountered during construction, start-up and check-out of the solar energy heating and cooling system, together with the method employed to solve the problem at the time and/or recommendations for avoiding the problem in the future design of similar systems. Appendices A through H contain the installation, operation and maintenance submittals of the various manufacturers on the major items of equipment in the system. Reference CAPE-2823.« less

  18. A New Remote Communications Link to Reduce Residential PV Solar Costs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, Randy; Sugiyama, Rod

    Monitoring of PV/DER site production is expensive to install and unreliable. Among third party systems providers, lost communications links are a growing concern. Nearly 20% of links are failing, provisioning is complex, recovery is expensive, production data is lost, and access is fragmented. FleetLink is a new concept in DER system communications, purpose built for lowering the cost of maintaining active contact with residential end user sites and ensuring that production data is reliably available to third party systems providers. Systems providers require accurate, secure system monitoring and reporting of production data and system faults while driving down overall costsmore » to compete effectively. This plug and play, independently operating communications solution lowers the cost of fleet contact from typically .08 dollars-$.12/W down to .02 dollars -.03/W including installation and maintenance expenses. FleetLink establishes a breakthrough in simplicity that facilitates rapid expansion of residential solar by reducing initial capital outlay and lowering installation labor time and skill levels. The solution also facilitates higher DER installation growth rates by driving down maintenance costs and eliminating communications trouble calls. This is accomplished by the FleetLink’s unique network technology that enables dynamic network configuration for fast changes, and active, self-healing DER site contact for uptime assurance. Using an open source network framework with proprietary, application specific enhancements, FleetLink independently manages connectivity, security, recovery, grid control communications, and fleet expansion while presenting a compliant SunSpec interface to the third party operations centers. The net system cost savings of at least .05 dollars/W supports the SunShot cost goals and the flexibility and scalability of the solution accelerates the velocity and ubiquitous adoption of solar.« less

  19. 49 CFR 236.567 - Restrictions imposed when device fails and/or is cut out en route.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cut out en route. 236.567 Section 236.567 Transportation Other Regulations Relating to Transportation... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...

  20. 49 CFR 236.506 - Release of brakes after automatic application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.506 Release of brakes after automatic application. The automatic train stop or train control apparatus shall prevent release of the...

  1. 49 CFR 236.207 - Electric lock on hand-operated switch; control.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.207 Electric lock on hand-operated... 49 Transportation 4 2011-10-01 2011-10-01 false Electric lock on hand-operated switch; control...

  2. 49 CFR 236.528 - Restrictive condition resulting from open hand-operated switch; requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and... with circuit controller is used, the resultant restrictive condition of an automatic train stop or...

  3. 49 CFR 236.528 - Restrictive condition resulting from open hand-operated switch; requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and... with circuit controller is used, the resultant restrictive condition of an automatic train stop or...

  4. 49 CFR 236.506 - Release of brakes after automatic application.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.506 Release of brakes after automatic application. The automatic train stop or train control apparatus shall prevent release of the...

  5. 49 CFR 236.554 - Rate of pressure reduction; equalizing reservoir or brake pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions... pressure or brake-pipe pressure reduction during an automatic brake application shall be at a rate not less...

  6. 49 CFR 236.554 - Rate of pressure reduction; equalizing reservoir or brake pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions... pressure or brake-pipe pressure reduction during an automatic brake application shall be at a rate not less...

  7. Abstract of operations - boats automated reporting system 1.0 : installation and maintenance guide version 1.0 January 1995

    DOT National Transportation Integrated Search

    1995-01-01

    The AOPS Boats system was developed to assist you in compiling your quarterly AOPS data and sending it to Headquarters. An additional component was designed solely to field use to help the station track certification dates by training activities on l...

  8. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  9. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  10. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  11. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  12. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  13. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads. Roadbeds...

  14. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  15. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  16. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  17. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  18. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  19. Hard metal exposures. Part 1: Observed performance of three local exhaust ventilation systems.

    PubMed

    Guffey, S E; Simcox, N; Booth, D W; Hibbard, R; Stebbins, A

    2000-04-01

    Not every ventilation system performs as intended; much can be learned when they do not. The purpose of this study was to compare observed initial performance to expected levels for three saw-reconditioning shop ventilation systems and to characterize the changes in performance of the systems over a one-year period. These three local exhaust ventilation systems were intended to control worker exposures to cobalt, cadmium, and chromium during wet grinding, dry grinding, and welding/brazing activities. Prior to installation the authors provided some design guidance based on Industrial Ventilation, a Manual of Recommended Practice. However, the authors had limited influence on the actual installation and operation and no line authority for the systems. In apparent efforts to cut costs and to respond to other perceived needs, the installed systems deviated from the specifications used in pressure calculations in many important aspects, including adding branch ducts, use of flexible ducts, the choice of fans, and the construction of some hoods. After installation of the three systems, ventilation measurements were taken to determine if the systems met design specifications, and worker exposures were measured to determine effectiveness. The results of the latter will be published as a companion article. The deviations from design and maintenance failures may have adversely affected performance. From the beginning to the end of the study period the distribution of air flow never matched the design specifications for the systems. The observed air flows measured within the first month of installation did not match the predicated design air flows for any of the systems, probably because of the differences between the design and the installed system. Over the first year of operation, hood air flow variability was high due to inadequate cleaning of the sticky process materials which rapidly accumulated in the branch ducts. Poor distribution of air flows among branch ducts frequently produced individual hood air flows that were far below specified design levels even when the total air flow through that system was more than adequate. To experienced practitioners, it is not surprising that deviations from design recommendations and poor maintenance would be associated with poor system performance. Although commonplace, such experiences have not been documented in peer-reviewed publications to date. This publication is a first step in providing that documentation.

  20. Advance traffic control warning systems for maintenance operations : final report.

    DOT National Transportation Integrated Search

    1976-07-01

    The report discusses the effect of certain variables defined by sign size, height of installation and legend on the driver responses as measured by speed, conflict and queuing parameters. Effects of electronically actuated, directional flashing signs...

  1. 48 CFR 9.501 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or facilities); (3) Routine legal, actuarial, auditing, and accounting services; and (4) Training services. [55...

  2. 49 CFR 236.329 - Bolt lock.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Interlocking Rules and Instructions... derail and displaying an aspect indicating stop cannot be operated to display a less restrictive aspect...

  3. System design optimization for stand-alone photovoltaic systems sizing by using superstructure model

    NASA Astrophysics Data System (ADS)

    Azau, M. A. M.; Jaafar, S.; Samsudin, K.

    2013-06-01

    Although the photovoltaic (PV) systems have been increasingly installed as an alternative and renewable green power generation, the initial set up cost, maintenance cost and equipment mismatch are some of the key issues that slows down the installation in small household. This paper presents the design optimization of stand-alone photovoltaic systems using superstructure model where all possible types of technology of the equipment are captured and life cycle cost analysis is formulated as a mixed integer programming (MIP). A model for investment planning of power generation and long-term decision model are developed in order to help the system engineer to build a cost effective system.

  4. Guidelines for the installation, inspection, maintenance and repair of structural supports for highway signs, luminaires, and traffic signals

    DOT National Transportation Integrated Search

    2005-03-01

    This document provides guidance for the installation, inspection, maintenance, and repair of structural supports for highway signs, luminaires and traffic signals. The primary purpose is to provide owners with information that can assist them in mana...

  5. Donald Baker | NREL

    Science.gov Websites

    -7162 Don assists with the installation and maintenance of the NWTC's field test turbines as well as with test article installations and testing in the Structural Testing Laboratory and both dynamometer facilities. He participates in the operation and maintenance of the field test sites and meteorological

  6. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Installation, operation, and maintenance instructions. 159.57 Section 159.57 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF...

  7. Systems Engineering Management Procedures

    DTIC Science & Technology

    1966-03-10

    load -..................................................... tch 2 1t55 𔄃 Trade Study-Companson ,f Methods for Measuring Quantities of Loaded... method of system operation and the ancillary equipment required such as instru- system elements is a highly involved process mentation. depot tooling...Installation and checkout. MiGI-Maintenance g-round equipment. IM-Item manager. NIP-Materiel improvement proipct. indenturo-A method of showing relationships

  8. Flexible and Secure Computer-Based Assessment Using a Single Zip Disk

    ERIC Educational Resources Information Center

    Ko, C. C.; Cheng, C. D.

    2008-01-01

    Electronic examination systems, which include Internet-based system, require extremely complicated installation, configuration and maintenance of software as well as hardware. In this paper, we present the design and development of a flexible, easy-to-use and secure examination system (e-Test), in which any commonly used computer can be used as a…

  9. Integrated Component-based Data Acquisition Systems for Aerospace Test Facilities

    NASA Technical Reports Server (NTRS)

    Ross, Richard W.

    2001-01-01

    The Multi-Instrument Integrated Data Acquisition System (MIIDAS), developed by the NASA Langley Research Center, uses commercial off the shelf (COTS) products, integrated with custom software, to provide a broad range of capabilities at a low cost throughout the system s entire life cycle. MIIDAS combines data acquisition capabilities with online and post-test data reduction computations. COTS products lower purchase and maintenance costs by reducing the level of effort required to meet system requirements. Object-oriented methods are used to enhance modularity, encourage reusability, and to promote adaptability, reducing software development costs. Using only COTS products and custom software supported on multiple platforms reduces the cost of porting the system to other platforms. The post-test data reduction capabilities of MIIDAS have been installed at four aerospace testing facilities at NASA Langley Research Center. The systems installed at these facilities provide a common user interface, reducing the training time required for personnel that work across multiple facilities. The techniques employed by MIIDAS enable NASA to build a system with a lower initial purchase price and reduced sustaining maintenance costs. With MIIDAS, NASA has built a highly flexible next generation data acquisition and reduction system for aerospace test facilities that meets customer expectations.

  10. Dry-running gas seals save $200,000/yr in retrofit hydrogen recycle compressor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pennacchi, R.P.; Germain, A.

    1987-10-01

    Texaco Chemical Company was using three drums of oil per day in the seal oil system of a hydrogen recycle compressor, resulting in maintenance and operational expenses of more than $160,000 per year. Running 24 hours/day, 365 days/yr, the 26-yr-old compressor is the heart of the benzene manufacturing process unit at the Port Arthur, Texas plant. In the event of an unscheduled shutdown, the important aromatics unit process would halt and cause production losses of thousands of dollars per day. In addition, the close monitoring and minimization of leakage are essential since the gas consists of over 75% hydrogen, withmore » methane, ethane, propane, isobutane, N-butane and pentanes. Texaco Chemical Company decided that retrofit of the hydrogen recycle compressor should be undertaken if the system could be developed to sharply reduce operations and maintenance costs, and increase efficiencies. Texaco engineers selected a dry running-type gas sealing system developed for pipeline compressors in the United States, Canada, and overseas. A tandem-type sealing system was designed to meet specific needs of a hydrogen recycle compressor. The retrofit was scheduled for August 1986 to coincide with the plant's preventative maintenance program. The seal system installation required five days. The retrofit progressed according to schedule, with no problems experienced at the first and several startups since the initial installation. Oil consumption has been eliminated, along with seal support and parasitic energy requirements. With the savings in seal oil, energy, operations and maintenance, payback period for the retrofit sealing system was just over six months. Savings are expected to continue at an annual rate of over $200,000.« less

  11. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: FID calibrationTHC FID optimization, and THC FID verification Calibrate all FID analyzers: upon initial installation and after major maintenance.Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon...

  12. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  13. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  14. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  15. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  16. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  17. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  18. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  19. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...

  20. 49 CFR 236.714 - Cab.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.714 Cab. The compartment of a locomotive from which the propelling power and power brakes of the train are manually...

  1. 30 CFR 75.1600-2 - Communication facilities; working sections; installation and maintenance requirements; audible or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., however, that where trolley phones and telephones are both used, an alternate source of power for the trolley phone system is not required. (d) Trolley phones connected to the trolley wire shall be grounded...

  2. GATEWAY Report Brief: SSL Demonstration: Long-Term Evaluation of Indoor Field Performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Report brief summarizing a GATEWAY program evaluation of the long-term performance characteristics (chromaticity change, maintained illuminance, and operations and maintenance) of LED lighting systems in four field installations previously documented in separate DOE GATEWAY reports.

  3. A high school is supplied with solar energy--Dallas, Texas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.

  4. 49 CFR 236.560 - Contact element, mechanical trip type; location with respect to rail.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and.... Contact element of automatic train stop device of the mechanical trip type shall be maintained at a height...

  5. 49 CFR 236.508 - Interference with application of brakes by means of brake valve.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.508 Interference with application of brakes by means of brake valve. The automatic train stop, train control, or...

  6. 49 CFR 236.508 - Interference with application of brakes by means of brake valve.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.508 Interference with application of brakes by means of brake valve. The automatic train stop, train control, or...

  7. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., wiring, power supply, and data acquisition and recording system that are compatible with the output... temperature CPMS that is used to monitor the combustion chamber temperature of a thermal oxidizer or the... where it is easily recognized by plant operating personnel. (6) For positive pressure fabric filter...

  8. Solar energy system installed at the North Georgia APDC office building

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A hydronic, automatic drain-down solar heating and cooling system is described. The system provides solar heat exchange from a 2,001 square foot effective collector area and supplies 65-70 percent of the building's cooling demand, 90-95 percent of the heating demand, and domestic hot water. The acceptance test plan and results, system operation and maintenance, and predicted system performance are presented.

  9. WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allan Jones

    2003-09-01

    This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energymore » markets.« less

  10. Cryogenic Insulation Systems

    NASA Technical Reports Server (NTRS)

    Augustynowicz, S. D.; Fesmire, J. E.; Wikstrom, J. P.

    1999-01-01

    The results of a comparative study of cryogenic insulation systems performed are presented. The key aspects of thermal insulation relative to cryogenic system design, testing, manufacturing, and maintenance are discussed. An overview of insulation development from an energy conservation perspective is given. Conventional insulation materials for cryogenic applications provide three levels of thermal conductivity. Actual thermal performance of standard multilayer insulation (MLI) is several times less than laboratory performance and often 10 times worse than ideal performance. The cost-effectiveness of the insulation system depends on thermal performance; flexibility and durability; ease of use in handling, installation, and maintenance; and overall cost including operations, maintenance, and life cycle. Results of comprehensive testing of both conventional and novel materials such as aerogel composites using cryostat boil-off methods are given. The development of efficient, robust cryogenic insulation systems that operate at a soft vacuum level is the primary focus of this paper.

  11. Engineering study of the module/array interface for large terrestrial photovoltaic arrays

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Three major areas--structural, electrical, and maintenance--were evaluated. Efforts in the structural area included establishing acceptance criteria for materials and members, determining loading criteria, and analyzing glass modules in various framing system configurations. Array support structure design was addressed briefly. Electrical considerations included evaluation of module characteristics, intermodule connectors, array wiring, converters and lightning protection. Plant maintenance features such as array cleaning, failure detection, and module installation and replacement were addressed.

  12. Cables and connectors: A compilation

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A compilation is presented that reflects the uses, adaptation, and maintenance plus service, that are innovations derived from problem solutions in the space R and D programs, both in house and by NASA and AEC contractors. Data cover: (1) technology revelant to the employment of flat conductor cables and their adaptation to and within conventional systems, (2) connectors and various adaptations, and (3) maintenance and service technology, and shop hints useful in the installation and care of cables and connectors.

  13. Site Data Acquisition Subsystem (SDAS) Mod 1, installation, operation, and maintenance manual

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Site Data Acquisition Subsystem (SDAS) Mod 1 was designed to collect sensor measurement data from solar energy demonstration site. This report provides a brief description of the SDAS and defines the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem.

  14. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  15. A Review of On-Site Wastewater Treatment Systems in Western Australia from 1997 to 2011

    PubMed Central

    Gunady, Maria; Shishkina, Natalia; Tan, Henry; Rodriguez, Clemencia

    2015-01-01

    On-site wastewater treatment systems (OWTS) are widely used in Western Australia (WA) to treat and dispose of household wastewater in areas where centralized sewerage systems are unavailable. Septic tanks, aerobic treatment units (ATUs), and composting toilets with greywater systems are among the most well established and commonly used OWTS. However, there are concerns that some OWTS installed in WA are either performing below expected standards or failing. Poorly performing OWTS are often attributed to inadequate installation, inadequate maintenance, poor public awareness, insufficient local authority resources, ongoing wastewater management issues, or inadequate adoption of standards, procedures, and guidelines. This paper is to review the installations and failures of OWTS in WA. Recommendations to the Department of Health Western Australia (DOHWA) and Local Government (LG) in regard to management strategies and institutional arrangements of OWTS are also highlighted. PMID:25960745

  16. 49 CFR 236.923 - Task analysis and basic requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... classroom, simulator, computer-based, hands-on, or other formally structured training and testing, except... for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements...) Based on a formal task analysis, identify the installation, maintenance, repair, modification...

  17. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  18. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  19. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  20. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  1. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  2. 40 CFR 86.094-25 - Maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sensors (including oxygen sensor if installed) and actuators. (D) Exhaust gas recirculation system..., and for 1985 and Later Model Year New Gasoline Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas... trucks and heavy-duty engines, the adjustment, cleaning, repair, or replacement of the oxygen sensor...

  3. 40 CFR 86.094-25 - Maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sensors (including oxygen sensor if installed) and actuators. (D) Exhaust gas recirculation system..., and for 1985 and Later Model Year New Gasoline Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas... trucks and heavy-duty engines, the adjustment, cleaning, repair, or replacement of the oxygen sensor...

  4. Nondestructive evaluation of the condition of subsurface drainage in pavements using ground penetrating radar (GPR).

    DOT National Transportation Integrated Search

    2013-11-11

    Subsurface drainage features are routinely incorporated in the design of pavement systems as they are believed to increase pavement service life provided that they are installed correctly and maintained. Maintenance, however, is challenging in that l...

  5. Paradigm Paralysis and the Plight of the PC in Education.

    ERIC Educational Resources Information Center

    O'Neil, Mick

    1998-01-01

    Examines the varied factors involved in providing Internet access in K-12 education, including expense, computer installation and maintenance, and security, and explores how the network computer could be useful in this context. Operating systems and servers are discussed. (MSE)

  6. [Training and challenges for the health care system in Brazil: an analysis of investments to expand health care service delivery].

    PubMed

    Soares, Adilson

    2007-07-01

    The goal of this study is to discuss the investments made by the Brazilian government to expand health care service delivery in the Unified National Health System (SUS) from 1995 to 2001. The data indicate a mismatch between investments to increase service delivery and maintenance and optimization of the health service network's capacity. The paper concludes that there is a need to guarantee financial maintenance of the system and conduct new investments based on an analysis of the installed capacity and the financial possibilities to guarantee resources for continuous delivery of this additional services supply.

  7. Architecting Integrated System Health Management for Airworthiness

    DTIC Science & Technology

    2013-09-01

    aircraft safety and reliability through condition-based maintenance [Miller et al., 1991]. With the same motivation, Integrated System Health Management...diagnostics and prognostics algorithms. 2.2.2 Health and Usage Monitoring System (HUMS) in Helicopters Increased demand for improved operational safety ...offshore shuttle helicopters traversing the petrol installations in the North Sea, and increased demand for improved operational safety and reduced

  8. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... your CPMS for leakage. (7) If your CPMS is not equipped with a redundant pressure sensor, perform at... sensor. (6) At least monthly, check all mechanical connections on your CPMS for leakage. (7) If your CPMS... integrity, oxidation, and galvanic corrosion. (f) For each bag leak detection system, you must meet the...

  9. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... properly or if any fluid flow is observed during the leakage test, the valve shall be repaired or replaced... maintenance of all fire- and gas-detection systems shall include the following: (i) Type, location, and number of detection sensors; (ii) Type and kind of alarms, including emergency equipment to be activated...

  10. Job Grading Standard for Electrician (High Voltage) WG-2810.

    ERIC Educational Resources Information Center

    Civil Service Commission, Washington, DC. Bureau of Policies and Standards.

    The standard covers nonsupervisory work involved in installation, test, repair, and maintenance of electric power plant and/or overhead and underground primary electrical distribution systems. These jobs require knowledge and application of electrical principles, procedures, materials, and safety standards governing work on electrical systems…

  11. Safe and Sanitary.

    ERIC Educational Resources Information Center

    Turner, Ed; Hauser, Dan

    1994-01-01

    Explains how daily maintenance and design planning can reduce the potential safety hazards found in athletic-facility locker rooms. Topics include designing locker rooms for visual openness and traffic control, providing non-slip surfaces and proper drainage, installing ventilation systems that can handle the moisture produced in locker rooms,…

  12. 49 CFR 195.444 - CPM leak detection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false CPM leak detection. 195.444 Section 195.444... PIPELINE Operation and Maintenance § 195.444 CPM leak detection. Each computational pipeline monitoring (CPM) leak detection system installed on a hazardous liquid pipeline transporting liquid in single...

  13. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...

  14. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...

  15. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...

  16. Highway-railway at-grade crossing structures : optimum design/installation practices and management program : an overview.

    DOT National Transportation Integrated Search

    2009-05-01

    Replacing and rehabilitating highway-railway at-grade crossings represent major track maintenance expenses for the U.S. highway governmental agencies and railroad industry. The ideal crossing system is one that will maintain a smooth surface and stab...

  17. 32 CFR Appendix C to Subpart M of... - Authorized Activities for Maneuver Training Area Access

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... commercial use (AR 405-80) Installation service and maintenance (AR 420-74, FL Reg 350-30) Non-DoD personnel...-1) Horseback riding on roads and vehicle tracks Walking, distance running Model airplane and rocket...) Installation service and maintenance (AR 420-74) Non-Commercial recreational use: Hunting, fishing and trapping...

  18. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? 63.2164 Section 63.2164 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR...

  19. Evaluation of Microcomputer-Based Operation and Maintenance Management Systems for Army Water/Wastewater Treatment Plant Operation.

    DTIC Science & Technology

    1986-07-01

    COMPUTER-AIDED OPERATION MANAGEMENT SYSTEM ................. 29 Functions of an Off-Line Computer-Aided Operation Management System Applications of...System Comparisons 85 DISTRIBUTION 5V J. • 0. FIGURES Number Page 1 Hardware Components 21 2 Basic Functions of a Computer-Aided Operation Management System...Plant Visits 26 4 Computer-Aided Operation Management Systems Reviewed for Analysis of Basic Functions 29 5 Progress of Software System Installation and

  20. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  1. STS-96 FD Highlights and Crew Activities Report: Flight Day 05

    NASA Technical Reports Server (NTRS)

    1999-01-01

    On this fifth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen performing logistics transfer activities within the Discovery/International Space Station orbiting complex. The crew transfers supplies, equipment, and water. Payette and Tokarev perform maintenance activities on the storage batteries in the Zarya module. Barry and Tokarev install acoustic insulation around some of the fans inside Zarya. Jernigan and Husband install shelving in 2 soft stowage racks. Husband and Barry troubleshoot and perform maintenance activities on the Early Communications System. At the end of the workday, Rominger, Jernigan, and Barry discussed the progress of the mission with NBC's "Today," CBS "This Morning," and CNN.

  2. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), you shall meet each requirement in the following table that applies to you. If you use . . . You shall . . . 1. pH strips Use pH strips with an accuracy of ±10 percent. 2. Colormetric tube sampling system Use a colormetric tube sampling system with a printed numerical scale in ppmv, a standard measurement...

  3. Flat-plate solar collector - installation package

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  4. Solar Technology Curriculum, 1980.

    ERIC Educational Resources Information Center

    Seward County Community Coll., Liberal, KS.

    This curriculum guide contains lecture outlines and handouts for training solar technicians in the installation, maintenance, and repair of solar energy hot water and space heating systems. The curriculum consists of four modular units developed to provide a model through which community colleges and area vocational/technical schools can respond…

  5. Ringling School of Art and Design Builds a CASTLE.

    ERIC Educational Resources Information Center

    Morse, Yvonne; Davis, Wendy

    1984-01-01

    Describes the development and installation of the Computer Automated Software for the Total Library Environment System (CASTLE), which uses a microcomputer to automate operations of small academic library in six main areas: circulation, online catalog, inventory and file maintenance, audiovisual equipment, accounting, and information and…

  6. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...

  7. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.01-1 Section 111.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services...

  8. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...

  9. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...

  10. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...

  11. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this...

  12. 48 CFR 217.171 - Multiyear contracts for services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agency may enter into multiyear contracts for supplies and services required for management, maintenance..., maintenance, and support of facilities and installations. (ii) Maintenance or modification of aircraft, ships... services (e.g., ground maintenance, in-plane refueling, bus transportation, and refuse collection and...

  13. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  14. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  15. Heat Recovery Ventilation for Housing: Air-to-Air Heat Exchangers.

    ERIC Educational Resources Information Center

    Corbett, Robert J.; Miller, Barbara

    The air-to-air heat exchanger (a fan powered ventilation device that recovers heat from stale outgoing air) is explained in this six-part publication. Topic areas addressed are: (1) the nature of air-to-air heat exchangers and how they work; (2) choosing and sizing the system; (3) installation, control, and maintenance of the system; (4) heat…

  16. Reducing unscheduled plant maintenance delays -- Field test of a new method to predict electric motor failure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Homce, G.T.; Thalimer, J.R.

    1996-05-01

    Most electric motor predictive maintenance methods have drawbacks that limit their effectiveness in the mining environment. The US Bureau of Miens (USBM) is developing an alternative approach to detect winding insulation breakdown in advance of complete motor failure. In order to evaluate the analysis algorithms necessary for this approach, the USBM has designed and installed a system to monitor 120 electric motors in a coal preparation plant. The computer-based experimental system continuously gathers, stores, and analyzes electrical parameters for each motor. The results are then correlated to data from conventional motor-maintenance methods and in-service failures to determine if the analysismore » algorithms can detect signs of insulation deterioration and impending failure. This paper explains the on-line testing approach used in this research, and describes monitoring system design and implementation. At this writing data analysis is underway, but conclusive results are not yet available.« less

  17. A cost evaluation of cross-border truck emissions testing using heavy duty remote sensing equipment : final report 601.

    DOT National Transportation Integrated Search

    2008-06-01

    The objective of this research study was to perform a thorough evaluation of the feasibility and cost implications for initial system installation and ongoing program and maintenance costs for a land port of entry truck emissions program utilizing he...

  18. CAI System Costs: Present and Future.

    ERIC Educational Resources Information Center

    Pressman, Israel; Rosenbloom, Bruce

    1984-01-01

    Discusses costs related to providing computer assisted instruction (CAI), considering hardware, software, user training, maintenance, and installation. Provides an example of the total cost of CAI broken down into these categories, giving an adjusted yearly cost. Projects future trends and costs of CAI as well as cost savings possibilities. (JM)

  19. Geothermal Heat Pumps Score High Marks in Schools.

    ERIC Educational Resources Information Center

    National Renewable Energy Lab (DOE).

    Geothermal heat pumps (GHPs) are showing their value in providing lower operating and maintenance costs, energy efficiency, and superior classroom comfort. This document describes what GHPs are and the benefits a school can garner after installing a GHP system. Three case studies are provided that illustrate these benefits. Finally, the Department…

  20. Pacer Comet 4: Automated Jet Engine Testing of a TF33-P100 Pratt & Whitney Engine

    NASA Astrophysics Data System (ADS)

    Mason, Rex Bolding

    Pacer Comet 4 found its life out of necessity to replace an obsolescent Pacer Comet 3 engine test system at Tinker AFB in Oklahoma City, OK. Pacer Comet 3 (PC3) was created and installed in the early 1980's to test jet engines from a wide range of planes. PC3 had several problems from a maintenance standpoint: contractors designed and installed the system but the contract did not include the OEM data package. Without drawings or design knowledge, fixing the smallest of problems could turn into a multi-day project. In addition to high cost, as the OEM companies of proprietary parts went out of business, it became impossible to find a replacement for a failed part. These issues set the framework for the Pacer Comet 4 (PC4) system. PC4 was created as an organic AF and Department of Defense collaboration to fix the issues with PC3. PC4 provides the customer with a complete data package including multiple drawing sets and data sheets for all parts used, as well as design files for all PCBs created in house. PC4 has a standard to use commercially available off the shelf parts (COTS). The reason for this is sustainability in maintenance. If a part is to fail, it should be able to be purchased from any manufacturer that meets the specs of the original product. No proprietary parts are used, except as directed by the engine's OEM. This thesis will focus on the design and installation of the on-frame data acquisition PC4 system for the Pratt & Whitney TF33-P100A-QEC engine that is currently in use on the E3 Sentry. This thesis will show efficiency improvements for maintenance sustainability (70% cabling reduction) as well as discuss performance improvements in both test and production environments.

  1. [Air quality control systems: heating, ventilating, and air conditioning (HVAC)].

    PubMed

    Bellucci Sessa, R; Riccio, G

    2004-01-01

    After a brief illustration of the principal layout schemes of Heating, Ventilating, and Air Conditioning (HVAC), the first part of this paper summarizes the standards, both voluntary and compulsory, regulating HVAC facilities design and installation with regard to the question of Indoor Air Quality (IAQ). The paper then examines the problem of ventilation systems maintenance and the essential hygienistic requirements in whose absence HVAC facilities may become a risk factor for people working or living in the building. Lastly, the paper deals with HVAC design strategies and methods, which aim not only to satisfy comfort and air quality requirements, but also to ensure easy and effective maintenance procedures.

  2. Installation and service manual for the U.S. Geological Survey manometers

    USGS Publications Warehouse

    Craig, James D.

    1983-01-01

    The purpose of this manual is to describe the installation, operation, and maintenance of the bubble-gage manometers currently (1982) used by the U.S. Geological Survey. Other applications of these devices, such as the long manometer and differential manometer, are discussed, and accessories available for them are described. The bubble gage (water-stage manometer with gas-purge system) described in the Installation and Service Manual, October 1962, has been extensively modified and developed into the STACOM (stabilized and temperature compensated) device. This chapter is the manual for the STACOM unit and an update of the manual for the screw-type bubble gage. A parts list is included for both units.

  3. Primary Mirror Figure Maintenance of the Hobby-Eberly Telescope using the Segment Alignment Maintenance System

    NASA Technical Reports Server (NTRS)

    Rakoczy, John; Hall, Drew; Howard, Ricky; Ly, William; Weir, John; Montgomery, Edward; Brantley, Lott W. (Technical Monitor)

    2002-01-01

    The Segment Alignment Maintenance System (SAMs) was installed on McDonald Observatory's Hobby-Eberly Telescope (HET) in August 2001. The SAMs became fully operational in October 2001. The SAMs uses a system of 480 inductive edge sensors to correct misalignments of the HET's 91 primary mirror segments when the segments are perturbed from their aligned reference positions. A special observer estimated and corrects for the global radius of curvature (GroC) mode, a mode unobservable by the edge sensors. The SAMs edge sensor system and (GroC) estimator are able to maintain HET's primary figure for much longer durations than previously had been observed. Telescope image quality has improved, and the amount of overhead time required from primary mirror alignment has been reduced. This paper gives a functional description of the SAMs control system and presents performance verification data. This paper also describes how the SAMs has improved the operational efficiency of the HET.

  4. 30 CFR 206.259 - Determination of washing allowances.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Allowable maintenance expenses include: Maintenance of the wash plant; maintenance of equipment; maintenance..., or a cost equal to the depreciable investment in the wash plant multiplied by the rate of return in... depreciable fixed assets (including costs of delivery and installation of capital equipment) which are an...

  5. Alternate concepts study extension. Volume 2: Part 4: Avionics

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A recommended baseline system is presented along with alternate avionics systems, Mark 2 avionics, booster avionics, and a cost summary. Analyses and discussions are included on the Mark 1 orbiter avionics subsystems, electrical ground support equipment, and the computer programs. Results indicate a need to define all subsystems of the baseline system, an installation study to determine the impact on the crew station, and a study on access for maintenance.

  6. Five-city economics of a solar hot-water-system

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report projects energy savings and system costs for five sites using analysis of actual solar energy installation performance in Togus, Maine. Maine system supplies 75 percent of hot water needed for single-family residence; economic payback period is 19 years. Benefits for all sites depend on maintenance or decrease of initial investment required and continuing increase in cost of conventional energy. Report includes analysis weighing potential changes in variables used to evaluate system profitability.

  7. Photovoltaic pump systems

    NASA Astrophysics Data System (ADS)

    Klockgether, J.; Kiessling, K. P.

    1983-09-01

    Solar pump systems for the irrigation of fields and for water supply in regions with much sunshine are discussed. For surface water and sources with a hoisting depth of 12 m, a system with immersion pumps is used. For deep sources with larger hoisting depths, an underwater motor pump was developed. Both types of pump system meet the requirements of simple installation and manipulation, safe operation, maintenance free, and high efficiency reducing the number of solar cells needed.

  8. WTS-4 system verification unit for wind/hydroelectric integration study

    NASA Technical Reports Server (NTRS)

    Watts, A. W.

    1982-01-01

    The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

  9. Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.

    ERIC Educational Resources Information Center

    Seaman, George B., Sr.

    This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…

  10. 10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-08-01

    Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less

  11. Maintenance Resources by Building Use for U.S. Army Installations. Volume 2. Appendices A through H

    DTIC Science & Technology

    1991-05-01

    Installations, Volume II: Appendices A Through H RDTE dated 1980REIMB 1984 6 . AUTHOR(S) Edgar S. Neely and Robert D. Neathammer 7 . PERFORML’JG...Recurring Maintenance Factor 1.10 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0 .000 .000 .000 .000 .000 .050 .190 .240 .300 .280...Special Condition Multiplier 1.00 Annual Recurring Maintenance Factor .79 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0

  12. Solar energy system performance evaluation: Seasonal report for Decade 80 House, Tucson, Arizona

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The operational and thermal performance of the Decade 80 solar energy system is described. The system was designed by Cooper Development Association, Inc. with space heating and space cooling to a one-story, single family residence located in Tucson, Arizona. The Decade 80 House was designed and built in the mid-70's to be a showplace/workshop for solar energy utilization. Superior construction techniques, the use of quality materials and a full time maintenance staff have served to make the entire system an outstanding example of the application of solar energy for residential purposes. The luxury of a full time, on-site maintenance person is perhaps the single most important aspect of this program. While most installations cannot support this level of maintenance, it was very useful in keeping all subsystems operating in top form and allowing for a full season data collection to be obtained. Several conclusions were drawn from the long term monitoring effort, among which are: (1) flat plate collectors will support cooling; (2) definite energy savings can be realized; and (3) more frequent periodic maintenance may be required on solar energy systems that are not custom built.

  13. 7 CFR 1470.24 - Payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participant associated with planning, design, materials, installation, labor, management, maintenance, or..., construction, or maintenance of animal waste storage or treatment facilities or associated waste transport or...

  14. Acoustic Flow Monitor System - User Manual

    USGS Publications Warehouse

    LaHusen, Richard

    2005-01-01

    INTRODUCTION The Acoustic Flow Monitor (AFM) is a portable system that was designed by the U.S. Geological Survey Cascades Volcano Observatory to detect and monitor debris flows associated with volcanoes. It has been successfully used internationally as part of real-time warning systems in valleys threatened by such flows (Brantley, 1990; Marcial and others, 1996; Lavigne and others, 2000). The AFM system has also been proven to be an effective tool for monitoring some non-volcanic debris flows. This manual is intended to serve as a basic guide for the installation, testing, and maintenance of AFM systems. An overview of how the system works, as well as instructions for installation and guidelines for testing, is included. Interpretation of data is not covered in this manual; rather, the user should refer to the references provided for published examples of AFM data.

  15. SIMS prototype system 4: Design data brochure

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A pre-package prototype unit having domestic hot water and room solar heating capability that uses air as the collector fluid is described. This system is designed to be used with a small single-family dwelling where a roof mounted collector array is not feasible. The prototype unit is an assemble containing 203 square feet of effective collector surface with 113 cubic feet of rock storage. The design of structure and storage is modular, which permits expansion and reduction of the collector array and storage bed in 68 square feet and 37 cubic feet increments respectively. The system is designed to be transportable. This permitted assemble and certification testing in one area and installation in another area without tear down and reassemble. Design, installation, operation, performance and maintenance of this system are described.

  16. Development and testing of thermal energy storage modules for use in active solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    Parker, J. C.

    1981-01-01

    The project development requirements and criteria are presented along with technical data for the modules. Performance tests included: ducting, temperature, pressure and air flow measurements, dry and wet bulb temperature; duct pressure measurements; and air conditioning apparatus checks; installation, operation, and maintenance instructions are included.

  17. Photovoltaics | Climate Neutral Research Campuses | NREL

    Science.gov Websites

    Photovoltaics Photovoltaics Solar photovoltaics (PV) is a mature, commercially available technology arrays. Campus Solar Energy Options A PV system requires periodic maintenance, but upkeep averages two to undertaking a solar energy assessment or PV installation. Solar Energy Resources Solar energy production

  18. 40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...

  19. 40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...

  20. 40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...

  1. 30 CFR 57.4531 - Surface flammable or combustible liquid storage buildings or rooms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 57.4531 Surface... fire resistance rating of at least one hour; or (2) Equipped with an automatic fire supression system...

  2. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... accuracy that is traceable to National Institute of Standards and Technology (NIST) standards. (ii) The... section. (i) Perform a single-point calibration using an NIST-certified buffer solution that is accurate... include a redundant pH sensor, perform a single point calibration using an NIST-certified buffer solution...

  3. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... accuracy that is traceable to National Institute of Standards and Technology (NIST) standards. (ii) The... section. (i) Perform a single-point calibration using an NIST-certified buffer solution that is accurate... include a redundant pH sensor, perform a single point calibration using an NIST-certified buffer solution...

  4. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... include a daily calibration drift assessment, a quarterly performance audit, and an annual zero alignment... performance audit, or an annual zero alignment audit. (7) You must calculate and record 6-minute averages from... absolute particulate matter loadings. (5) The bag leak detection system must be equipped with a device to...

  5. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... include a daily calibration drift assessment, a quarterly performance audit, and an annual zero alignment... performance audit, or an annual zero alignment audit. (7) You must calculate and record 6-minute averages from... absolute particulate matter loadings. (5) The bag leak detection system must be equipped with a device to...

  6. Matthew Jones House: Historic Maintenance and Repair Manual

    DTIC Science & Technology

    2014-08-01

    either have to budget money to repair basement doors or in- stall a drainage system to diverge water away from the structure before they begin to...accomplished either through grading the soil, installing a French drainage system , or combining both techniques. French drains are primarily used to...soil drainage system are promoting the deterioration of the base of the house as a direct result of water splashing off the gravel (Figure 48), and

  7. Endeavour lands atop 747 after downtime at Palmdale, CA

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Orbiter Endeavour arrives at KSCs Shuttle Landing Facility atop NASAs Boeing 747 Shuttle Carrier Aircraft (SCA) as it returns March 27, 1997 from Palmdale, Calif., after an eight-month Orbiter Maintenance Down Period (OMDP). Nearly 100 modifications were made to Endeavour during that time period, including some that were directly associated with work required to support International Space Station Operations. The most extensive of those was the installation of an external airlock to allow the orbiter to dock with the Station. Other modifications included upgrades to Endeavours power supply system, general purpose computers and thermal protection system, along with the installation of new light-weight commander and pilot seats and other weight-saving modifications.

  8. Optical fiber cabling technologies for flexible access network

    NASA Astrophysics Data System (ADS)

    Tanji, Hisashi

    2008-07-01

    Fiber-to-the-home (FTTH) outside plant infrastructure should be so designed and constructed as to flexibly deal with increasing subscribers and system evolution to be expected in the future, taking minimization of total cost (CAPEX and OPEX) into consideration. With this in mind, fiber access architectures are reviewed and key technologies on optical fiber and cable for supporting flexible access network are presented. Low loss over wide wavelength (low water peak) and bend-insensitive single mode fiber is a future proof solution. Enhanced separable ribbon facilitates mid-span access to individual fibers in a cable installed, improving fiber utilizing efficiency and flexibility of distribution design. It also contributes to an excellent low PMD characteristic which could be required for video RF overlay system or high capacity long reach metro-access convergence network in the future. Bend-insensitive fiber based cabling technique including field installable connector greatly improves fiber/cable handling in installation and maintenance work.

  9. Increasing the efficiency of the process of snow mass utilization from the urban infrastructure and reducing the negative impact on the environment through the introduction of an installation for the utilization of snow mass

    NASA Astrophysics Data System (ADS)

    Dovbysh, V. O.; Burakova, L. N.; Burakova, A. D.

    2018-01-01

    The article raises the problem of the maintenance of the urban area in winter, namely, the problem of disposal of snow masses from the urban area. The article describes the main disadvantages of the existing snow-melting systems for the utilization of city snow mass and are encouraged to develop an installation for melting of snow, functioning at the expense of power consumption. The developed installation allows to reduce the noise level during its operation, to exclude the influence of exhaust gases on the environment, therefore, to improve the environmental safety of the urban infrastructure.

  10. 29 CFR 500.105 - DOT standards adopted by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Act directly concerned with the management, maintenance, operation, or driving of motor vehicles..., agents, drivers, representatives and employees directly concerned with the installation and maintenance...) Inspection and maintenance of motor vehicles (Source: 49 CFR 398.7). Every person shall systematically...

  11. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.

  12. Installation guidelines for solar heating system, single-family residence at New Castle, Pennsylvania

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar heating system installer guidelines are presented for each subsystem. This single family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: (1) liquid cooled flat plate collectors; (2) water storage tank; (3) passive solar-fired domestic water preheater; (4) electric hot water heater; (5) heat pump with electric backup; (6) solar hot water coil unit; (7) tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; (8) control system; and (9) air-cooled heat purge unit. Information is provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance in the form of written descriptions, schematics, detail drawings, pictures, and manufacturer's component data.

  13. Application of a Resilience Framework to Military Installations: A Methodology for Energy Resilience Business Case Decisions

    DTIC Science & Technology

    2016-10-04

    analysis (due to site-level evaluations), but could be added in the future, include: wind turbines (the installations we visited were not interested due...procurement, operation, maintenance , testing, and fueling of the generators, detailed inventory and cost data is difficult to obtain. The DPW is often...understaffed, leading to uneven testing and maintenance of the equipment despite their best efforts. The reliability of these generators is typically

  14. Supplemental Analysis Survey of C&P Telephone Inside Wiring.

    DTIC Science & Technology

    1986-10-01

    telephone company facilities in 1984. In 1985, among other actions favorable to deregulation and detariffing of inside wiring, the FCC proposed to detariff ...installation of inside wiring, detariff the maintenance of all inside wiring, treat all inside wiring as customer premise equipment and pass ownership...85-148, 50 Fed. let. 13991 (April 9, 1985), pToposing to detariff the installation of simple inside wiring and also to detariff the maintenance of all

  15. Solar heating and hot water system installed at Arlington Raquetball Club, Arlington, Virginia

    NASA Technical Reports Server (NTRS)

    1981-01-01

    A solar space and water heating system is described. The solar energy system consists of 2,520 sq. ft. of flat plate solar collectors and a 4,000 gallon solar storage tank. The transfer medium in the forced closed loop is a nontoxic antifreeze solution (50 percent water, 50 percent propylene glycol). The service hot water system consists of a preheat coil (60 ft. of 1 1/4 in copper tubing) located in the upper third of the solar storage tank and a recirculation loop between the preheat coil and the existing electric water heaters. The space heating system consists of two separate water to air heat exchangers located in the ducts of the existing space heating/cooling systems. The heating water is supplied from the solar storage tank. Extracts from site files, specification references for solar modifications to existing building heating and hot water systems, and installation, operation and maintenance instructions are included.

  16. Understanding the needs of hand control users, driver rehabilitation specialists, and dealers/installers.

    PubMed

    Lowe, Evan; Drouin, Nathalie; Venhovens, Paul J; Brooks, Johnell O

    2014-10-01

    Understanding unique perspectives from key stakeholder groups involved in the hand control (HC) industry, including driver rehabilitation specialists (DRSs) who train users how to use their HCs, dealers/installers, and users, may become increasingly important in the United States due to increases in elderly, diabetic, and wounded warrior amputee driving populations. In this exploratory study, phone interviews were conducted with 20 DRSs, 20 dealers/installers, and 20 users regarding their perspectives about HC training, maintenance and operation, and design improvements. Results revealed common views and differences in perspectives about whether HC users should receive training and for how long, when and how often users should receive maintenance on their HCs, and what DRSs, dealers/installers, and users would like to see in the future.

  17. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doyle, C.; Truitt, A.; Inda, D.

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligencemore » activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.« less

  18. Expedition 48/49 crew visit to MSFC

    NASA Image and Video Library

    2017-04-06

    NASA astronaut Kate Rubins presents highlights from Expedition 48/49, her mission to the International Space Station, to team members and Space Camp students from the U.S. Space & Rocket Center in Huntsville, April 6 at NASA's Marshall Space Flight Center. During her mission, Rubins became the first person to sequence DNA in space, researching technology development for deep-space exploration by humans, Earth and space science. She also conducted two spacewalks, in which she and NASA astronaut Jeff Williams installed an International Docking Adapter and performed maintenance of the station's external thermal control system and installed high-definition cameras.

  19. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  20. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  1. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  2. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  3. View of STS-129 MS3 Foreman during EVA2

    NASA Image and Video Library

    2009-11-21

    S129-E-007789 (21 Nov. 2009) --- Astronaut Mike Foreman, STS-129 mission specialist, participates in the mission's second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, eight-minute spacewalk, Foreman and astronaut Randy Bresnik (out of frame), mission specialist, installed a Grappling Adaptor to On-Orbit Railing Assembly, or GATOR, on the Columbus laboratory. GATOR contains a ship-tracking antenna system and a HAM radio antenna. They relocated a floating potential measurement unit that gauges electric charges that build up on the station, deployed a Payload Attach System on the space-facing side of the Starboard 3 truss segment and installed a wireless video system that allows spacewalkers to transmit video to the station and relay it to Earth.

  4. Active Solar Energy System Design, Installation and Maintenance Manual.

    DTIC Science & Technology

    1986-04-01

    3.03 400 Fiberglass, pipe 3.45 350 Polystyrene, extruded 5.00 170 Polyureathane 6.25 210 Foam Rubber 4.35 150 In selecting a particular insulation...sandwich & snack shops Apartment Houses (number of apartments): 20 or Less 42.0 gal/apartment 50 40.0 gal/apartment 75 38.0 gal/apartment 100 37.0 gal

  5. Wind instrument mountings for above-the-cab lookout exposure

    Treesearch

    Owen P. Cramer; Ralph H. Moltzau

    1968-01-01

    The lookout tower offers a ready-made platform from which the speed of true unobstructed wind can be measured, then reduced to equivalent of 20-foot wind. Tower-mounted instruments must meet the requirements of a lightning conductor system, but should also be easily installed and removed for storage and maintenance. Lightweight aluminum mountings for catwalk or flat-...

  6. 40 CFR 1048.205 - What must I include in my application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (AECDs) and all fuel-system components you will install on any production or test engine. Identify the... fuel types on which your engines are designed to operate (for example, gasoline and natural gas). List... maintenance you did. (g) List the specifications of each test fuel to show that it falls within the required...

  7. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  8. 40 CFR 1048.205 - What must I include in my application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (AECDs) and all fuel-system components you will install on any production or test engine. Identify the... fuel types on which your engines are designed to operate (for example, gasoline and natural gas). List... maintenance you did. (g) List the specifications of each test fuel to show that it falls within the required...

  9. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  10. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  11. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  12. 14 CFR Appendix A to Part 43 - Major Alterations, Major Repairs, and Preventive Maintenance

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... hub design. (iii) Changes in the governor or control design. (iv) Installation of a propeller governor.... (iv) Engine mounts. (v) Control system. (vi) Landing gear. (vii) Hull or floats. (viii) Elements of an... of gravity limits of the aircraft. (xii) Changes to the basic design of the fuel, oil, cooling...

  13. Solar Hot Water for Motor Inn--Texas City, Texas

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Final report describes solar domestic-hot-water heater installation at LaQuinta Motor Inn, Texas City, Texas which furnished 63% of total hot-water load of new 98-unit inn. Report presents a description of system, drawings and photographs of collectors, operations and maintenance instructions, manufacturers' specifications for pumps, and an engineer's report on performance.

  14. Closed Circuit TV Surveillance Systems in Educational Buildings: Crime Prevention in Schools. Building Bulletin 75.

    ERIC Educational Resources Information Center

    Whitehouse, B.; Patel, M.; Gofton, K.

    Recent years have shown an increase in arson, theft, and vandalism committed in educational facilities resulting in a need for managers to formulate security policies. This document provides technical advice and guidance on policy for the design, specification, installation, maintenance, operation, and management of closed circuit TV (CCTV)…

  15. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...

  16. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...

  17. Polymer concrete overlay on Beulah Road Bridge : interim report no. 1--installation and initial condition of overlay.

    DOT National Transportation Integrated Search

    1982-01-01

    The installation of a thin polymer concrete overlay on the Beulah Road bridge demonstrates that an overlay of low permeability and high skid resistance can be successfully installed by maintenance forces with a minimum of disruption to traffic, appro...

  18. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  19. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  20. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  1. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  2. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  3. Void Fraction Instrument operation and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  4. Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem

    NASA Technical Reports Server (NTRS)

    Kleiner, G. N.

    1981-01-01

    The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.

  5. Influence of forces acting on side of machine on precision machining of large diameter holes

    NASA Astrophysics Data System (ADS)

    Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.

    2018-03-01

    One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.

  6. DOE/NREL supported wind energy activities in Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system,more » also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.« less

  7. Industrial applications of shearography for inspection of aircraft components

    NASA Astrophysics Data System (ADS)

    Krupka, Rene; Walz, Thomas; Ettemeyer, Andreas

    2005-04-01

    Shearography has been validated as fast and reliable inspection technique for aerospace components. Following several years phase of evaluation of the technique, meanwhile, shearography has entered the industrial production inspection. The applications basically range from serial inspection in the production line to field inspection in assembly and to applications in the maintenance and repair area. In all applications, the main advantages of shearography, as very fast and full field insection and high sensitivity even on very complex on composite materials have led to the decision for laser shearography as inspection tool. In this paper, we present some highlights of industrial shearography inspection. One of the first industrial installations of laser shearography in Europe was a fully automatic inspection system for helicopter rotorblades. Complete rotor blades are inspected within 10 minutes on delaminations and debondingg in the composite structure. In case of more complex components, robotic manipulation of the shearography camera has proven to be the optimal solution. An industry 6-axis robot give utmost flexibility to position the camera in any angle and distance. Automatic defect marking systems have also been introduced to indicate the exact position of the defect directly on the inspected component. Other applications are shearography inspection systems for abradable seals in jet engines and portable shearography inspection systems for maintenance and repair inspection in the field. In this paper, recent installations of automatice inspection systems in aerospace industries are presented.

  8. NREL Supports Innovative Offshore Wind Energy Projects | News | NREL

    Science.gov Websites

    installation, operation, and maintenance methods for wind turbines located far from shore. Fishermen's Energy will also use the twisted-jacket foundation for the five 5-MW turbines it plans to install 3 miles off about offshore wind and investigate interactions between turbines. Principle Power will install five 6

  9. Exp.55_US_EVA_49_03_2018_088_1430_633697

    NASA Image and Video Library

    2018-03-30

    SPACE STATION CREW WALKS IN SPACE TO UPGRADE SYSTEMS Veteran NASA astronauts Drew Feustel and Ricky Arnold ventured outside the International Space Station March 29 clad in U.S. spacesuits to install wireless communications antennas on the Tranquility module, replace a camera system on the port truss and remove suspect hoses from a cooling system. The excursion was the 209th in space station history for assembly, maintenance and upgrades, the seventh in Feustel’s career and the third for Arnold.

  10. Exp.55_US_EVA_49_02_2018_088_1230_633620

    NASA Image and Video Library

    2018-03-30

    SPACE STATION CREW WALKS IN SPACE TO UPGRADE SYSTEMS----------------------Veteran NASA astronauts Drew Feustel and Ricky Arnold ventured outside the International Space Station March 29 clad in U.S. spacesuits to install wireless communications antennas on the Tranquility module, replace a camera system on the port truss and remove suspect hoses from a cooling system. The excursion was the 209th in space station history for assembly, maintenance and upgrades, the seventh in Feustel’s career and the third for Arnold.

  11. EXP.55_US_EVA_49_04_2018_088_1630_633783

    NASA Image and Video Library

    2018-04-02

    SPACE STATION CREW WALKS IN SPACE TO UPGRADE SYSTEMS-----------------------Veteran NASA astronauts Drew Feustel and Ricky Arnold ventured outside the International Space Station March 29 clad in U.S. spacesuits to install wireless communications antennas on the Tranquility module, replace a camera system on the port truss and remove suspect hoses from a cooling system. The excursion was the 209th in space station history for assembly, maintenance and upgrades, the seventh in Feustel’s career and the third for Arnold.

  12. Exp.55_US_EVA_49_01_2018_088_1029_633551

    NASA Image and Video Library

    2018-03-30

    SPACE STATION CREW WALKS IN SPACE TO UPGRADE SYSTEMS----------------Veteran NASA astronauts Drew Feustel and Ricky Arnold ventured outside the International Space Station March 29 clad in U.S. spacesuits to install wireless communications antennas on the Tranquility module, replace a camera system on the port truss and remove suspect hoses from a cooling system. The excursion was the 209th in space station history for assembly, maintenance and upgrades, the seventh in Feustel’s career and the third for Arnold.

  13. Power System Implementation and Demonstration at Camp Katuu, Palau

    DTIC Science & Technology

    2011-05-11

    Horizontal Rows 3 Vertical Rows 3 Vertical Rows with Center Walkway 6 Vertical Rows 1 Amount of rail mounting (lf) 1440’ 1800’ 1800’ 1440’ 2 Ease of rail...installation some rail cutting required to clear walkway requires two level rail mounting system requires two level rail mounting system no rail...Maintenance access 21" horizontal & vertical walkway , does not have direct access to all panels Accessible with 15" walkways Direct access to each panel and

  14. Solar Technology Validation Project - USS Data, LLC: Cooperative Research and Development Final Report, CRADA Number CRD-09-367-04

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilcox, S.

    2013-08-01

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  15. Solar Technology Validation Project - RES Americas: Cooperative Research and Development Final Report, CRADA Number CRD-09-367-11

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilcox, S.

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  16. 30 CFR 28.3 - Installation, use, and maintenance of approved fuses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES General Provisions § 28.3 Installation, use, and... standards prescribed for short-circuit protective devices for trailing cables in Parts 75 and 77, Subchapter...

  17. On-Orbit Checkout and Activation of the ISS Oxygen Generation System

    NASA Technical Reports Server (NTRS)

    Bagdigian, Robert M.; Prokhorov, Kimberlee S.

    2007-01-01

    NASA has developed and; deployed an Oxygen Generation System (OGS) into the Destiny Module of the International Space Station (ISS). The major. assembly; included in this system is the Oxygen Generator Assembly. (OGA) which was developed under NASA contract by Hamilton Sundstrand Space Systems International (HSSSI), Inc. This paper summarizes the installation of the system into the Destiny Module, its initial checkout and periodic preventative maintenance activities, and its operational activation. Trade studies and analyses that were conducted with the goal of mitigating on-orbit operational risks are also discussed.

  18. The Cost Analysis of Corrosion Protection Solutions for Steel Components in Terms of the Object Life Cycle Cost

    NASA Astrophysics Data System (ADS)

    Kowalski, Dariusz; Grzyl, Beata; Kristowski, Adam

    2017-09-01

    Steel materials, due to their numerous advantages - high availability, easiness of processing and possibility of almost any shaping are commonly applied in construction for carrying out basic carrier systems and auxiliary structures. However, the major disadvantage of this material is its high corrosion susceptibility, which depends strictly on the local conditions of the facility and the applied type of corrosion protection system. The paper presents an analysis of life cycle costs of structures installed on bridges used in the road lane conditions. Three anti-corrosion protection systems were considered, analyzing their essential cost components. The possibility of reducing significantly the costs associated with anti-corrosion protection at the stage of steel barriers maintenance over a period of 30 years has been indicated. The possibility of using a new approach based on the life cycle cost estimation in the anti-corrosion protection of steel elements is presented. The relationship between the method of steel barrier protection, the scope of repair, renewal work and costs is shown. The article proposes an optimal solution which, while reducing the cost of maintenance of road infrastructure components in the area of corrosion protection, allows to maintain certain safety standards for steel barriers that are installed on the bridge.

  19. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... valid hour of data. (2) You must have valid data from at least 90 percent of the hours during which the... three of four equally spaced data values from that hour from a continuous monitoring system (CMS) that... that period using only average values that are based on valid data (i.e., not from out-of-control...

  20. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... valid hour of data. (2) You must have valid data from at least 90 percent of the hours during which the... three of four equally spaced data values from that hour from a continuous monitoring system (CMS) that... that period using only average values that are based on valid data (i.e., not from out-of-control...

  1. Solar space heating installed at Kansas City, Kansas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The solar energy system was constructed with the 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while an auxiliary energy system heats the office area of about 9,800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors are double glazed flat plate collectors with a gross area of 7,800 sq ft. Air is heated either through the collectors or by the electric resistance duct coils. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are presented.

  2. View of STS-129 MS2 Bresnik during EVA2

    NASA Image and Video Library

    2009-11-21

    S129-E-007227 (21 Nov. 2009) --- Astronaut Randy Bresnik (near the Columbus laboratory), STS-129 mission specialist, participates in the mission's second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, eight-minute spacewalk, Bresnik and astronaut Mike Foreman (out of frame), mission specialist, installed a Grappling Adaptor to On-Orbit Railing Assembly, or GATOR, on the Columbus laboratory. GATOR contains a ship-tracking antenna system and a HAM radio antenna. They relocated a floating potential measurement unit that gauges electric charges that build up on the station, deployed a Payload Attach System on the space-facing side of the Starboard 3 truss segment and installed a wireless video system that allows spacewalkers to transmit video to the station and relay it to Earth.

  3. View of STS-129 MS2 Bresnik during EVA2

    NASA Image and Video Library

    2009-11-21

    S129-E-007762 (21 Nov. 2009) --- Astronaut Randy Bresnik (near the Columbus laboratory), STS-129 mission specialist, participates in the mission's second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, eight-minute spacewalk, Bresnik and astronaut Mike Foreman (out of frame), mission specialist, installed a Grappling Adaptor to On-Orbit Railing Assembly, or GATOR, on the Columbus laboratory. GATOR contains a ship-tracking antenna system and a HAM radio antenna. They relocated a floating potential measurement unit that gauges electric charges that build up on the station, deployed a Payload Attach System on the space-facing side of the Starboard 3 truss segment and installed a wireless video system that allows spacewalkers to transmit video to the station and relay it to Earth.

  4. View of STS-129 MS2 Bresnik during EVA2

    NASA Image and Video Library

    2009-11-21

    S129-E-007756 (21 Nov. 2009) --- Astronaut Randy Bresnik (near the Columbus laboratory), STS-129 mission specialist, participates in the mission's second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, eight-minute spacewalk, Bresnik and astronaut Mike Foreman (out of frame), mission specialist, installed a Grappling Adaptor to On-Orbit Railing Assembly, or GATOR, on the Columbus laboratory. GATOR contains a ship-tracking antenna system and a HAM radio antenna. They relocated a floating potential measurement unit that gauges electric charges that build up on the station, deployed a Payload Attach System on the space-facing side of the Starboard 3 truss segment and installed a wireless video system that allows spacewalkers to transmit video to the station and relay it to Earth.

  5. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  6. Fleet retrofit report

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Flight tests are evaluated of an avionics system which aids the pilot in making two-segment approaches for noise abatement. The implications are discussed of equipping United's fleet of Boeing 727-200 aircraft with two-segment avionics for use down to Category 2 weather operating minima. The experience is reported of incorporating two-segment approach avionics systems on two different aircraft. The cost of installing dual two-segment approach systems is estimated to be $37,015 per aircraft, including parts, labor, and spares. This is based on the assumption that incremental out-of-service and training costs could be minimized by incorporating the system at airframe overhaul cycle and including training in regular recurrent training. Accelerating the modification schedule could add up to 50 percent to the modification costs. Recurring costs of maintenance of the installation are estimated to be of about the same magnitude as the potential recurrent financial benefits due to fuel savings.

  7. Solar heating and hot water system installed at Saint Louis, Missouri

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar heating and hot water system installed at the William Tao & Associates, Inc., office building in St. Louis, Missouri is described, including maintenance and construction problems, final drawings, system requirements, and manufacturer's component data. The solar system was designed to provide 50 percent of the hot water requirements and 45 percent of the space heating needs for a 900 sq ft office space and drafting room. The solar facility has 252 sq ft of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.

  8. Using Value-Focused Thinking to Evaluate the Practicality of Porous Pavement Parking Areas on Air Force Installations

    DTIC Science & Technology

    2006-03-01

    data for conventional systems was obtained mainly through the RS Means Assemblies Cost Data book (Balboni, 2005) while Bruce Ferguson’s Porous...Pavements book provided much of the information for porous systems (Ferguson, 2005). Additional information regarding pavement maintenance, inspection...Jacobs, M. M. J., Stet, M. J. A., & Molenaar , A. A. A. (2002). Decision model for the use of polymer modified binders in asphalt concrete for airfields

  9. Satellite freeze forecast system

    NASA Technical Reports Server (NTRS)

    Martsolf, J. D. (Principal Investigator)

    1983-01-01

    Provisions for back-up operations for the satellite freeze forecast system are discussed including software and hardware maintenance and DS/1000-1V linkage; troubleshooting; and digitized radar usage. The documentation developed; dissemination of data products via television and the IFAS computer network; data base management; predictive models; the installation of and progress towards the operational status of key stations; and digital data acquisition are also considered. The d addition of dew point temperature into the P-model is outlined.

  10. Could Wind or Solar Energy Replace Diesel Generators for Aviation Ground Maintenance Operations?

    DTIC Science & Technology

    2013-04-17

    power. Both of these systems depend on the sun to produce energy. Wind turbines depend on wind which results from the uneven heating of the earth...inefficient. In addition to these limitations, both systems are costly and their installation brings a number of challenges. For the wind turbines ...these challenges include: the obstruction created by the height of the turbines near airfields, the amount of land necessary for a 7 turbines wind farm

  11. Solar Water Heater

    NASA Technical Reports Server (NTRS)

    1993-01-01

    As a Jet Propulsion Laboratory (JPL) scientist Dr. Eldon Haines studied the solar energy source and solar water heating. He concluded he could build a superior solar water heating system using the geyser pumping principle. He resigned from JPL to develop his system and later form Sage Advance Corporation to market the technology. Haines' Copper Cricket residential system has no moving parts, is immune to freeze damage, needs no roof-mounted tanks, and features low maintenance. It provides 50-90 percent of average hot water requirements. A larger system, the Copper Dragon, has been developed for commercial installations.

  12. Utilization and Maintenance of the Federal Catalog System (FCS)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Federal Catalog System (FCS) was established and substantiated by law to aid the national economy and promote greater efficiency in supply management operations throughout the Federal Government. This Handbook establishes policies and procedures to be followed by NASA installations and certain contractors in cataloging items of supply in the Federal Catalog System and prescribes use of the system in supply management operations. This Handbook is not intended to duplicate the Federal Cataloging Manuals or Federal Cataloging Handbooks. For the most part, it describes actions that are peculiar to NASA.

  13. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...

  14. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...

  15. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...

  16. 32 CFR 552.31 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., industrial facilities, cemeteries, etc., generally will be designated as an installation where located... than for the production of materiel, munitions, or supplies. (f) Industrial installation. Any unit of... leased to the United States, substantially equipped with production utilities and maintenance machinery...

  17. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  18. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  19. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  20. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  1. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  2. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  3. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  4. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  5. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  6. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  7. Contribution to the Optimization of Strategy of Maintenance by Lean Six Sigma

    NASA Astrophysics Data System (ADS)

    Youssouf, Ayadi; Rachid, Chaib; Ion, Verzea

    The efficiency of the maintenance of the industrial systems is a major economic stake for their business concern. The main difficulties and the sources of ineffectiveness live in the choice of the actions of maintenance especially when the machine plays a vital role in the process of production. But as Algeria has embarked on major infrastructure projects in transport, housing, automobile, manufacturing industry and construction (factories, housing, highway, subway, tram, etc.) requiring new implications on maintenance strategies that meet industry requirements imposed by the exploitation. From then on and seen the importance of the maintenance on the economic market and sound impacts on the performances of the installations, methods of optimization were developed. For this purpose, to ensure the survival of businesses, be credible, contributing and competitive in the market, maintenance services must continually adapt to the progress of technical areas, technological and organizational even help maintenance managers to construct or to modify maintenance strategies, objective of this work. Our contribution in this work focuses on the optimization of maintenance for industrial systems by the use of Lean six Sigma bases. Lean Six Sigma is a method of improving the quality and profitability based on mastering statically of process and it is also a management style that based on a highly regulated organization dedicated to managing project. The method is based on five main steps summarized in the acronym (DMAIC): Define Measure, Analyze, Improve and Control. Application of the method on the maintenance processes with using maintenance methods during the five phases of the method will help to reduce costs and losses in order to strive for optimum results in terms of profit and quality.

  8. STS-109 Crew Interviews - Altman

    NASA Technical Reports Server (NTRS)

    2002-01-01

    STS-109 crew Commander Scott D. Altman is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goals and significance, which are all related to maintenance of the Hubble Space Telescope (HST). After the Columbia Orbiter's rendezvous with the HST, extravehicular activities (EVA) will be focused on several important tasks which include: (1) installing the Advanced Camera for Surveys; (2) installing a cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer); (3) repairing the reaction wheel assembly; (4) installing additional solar arrays; (5) augmenting the power control unit; (6) working on the HST's gyros. The reaction wheel assembly task, a late addition to the mission, may necessitate the abandonment of one or more of the other tasks, such as the gyro work.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perrin, Tess E.; Davis, Robert G.; Wilkerson, Andrea M.

    This GATEWAY project evaluated four field installations to better understand the long-term performance of a number of LED products, which can hopefully stimulate improvements in designing, manufacturing, specifying, procuring, and installing LED products. Field studies provide the opportunity to discover and investigate issues that cannot be simulated or uncovered in a laboratory, but the installed performance over time of commercially available LED products has not been well documented. Improving long-term performance can provide both direct energy savings by reducing the need to over-light to account for light loss and indirect energy savings through better market penetration due to SSL’s competitivemore » advantages over less-efficient light source technologies. The projects evaluated for this report illustrate that SSL use is often motivated by advantages other than energy savings, including maintenance savings, easier integration with control systems, and improved lighting quality.« less

  10. Operation and maintenance cost data for residential photovoltaic modules/panels

    NASA Technical Reports Server (NTRS)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-01-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  11. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less

  12. Aircraft Electronics Maintenance Training Simulator. Curriculum Outlines.

    ERIC Educational Resources Information Center

    Blackhawk Technical Coll., Janesville, WI.

    Instructional materials are provided for nine courses in an aircraft electronics maintenance training program. Courses are as follows: aviation basic electricity, direct current and alternating current electronics, basic avionic installations, analog electronics, digital electronics, microcomputer electronics, radio communications, aircraft…

  13. 23 CFR 630.1102 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... zone fatalities and injuries to workers and road users by establishing minimum requirements and..., installation and maintenance of temporary traffic control devices, and use of uniformed law enforcement officers during construction, utility, and maintenance operations, and by requiring contract pay items to...

  14. Flow-Control Unit For Nitrogen And Hydrogen Gases

    NASA Technical Reports Server (NTRS)

    Chang, B. J.; Novak, D. W.

    1990-01-01

    Gas-flow-control unit installed and removed as one piece replaces system that included nine separately serviced components. Unit controls and monitors flows of nitrogen and hydrogen gases. Designed for connection via fluid-interface manifold plate, reducing number of mechanical fluid-interface connections from 18 to 1. Unit provides increasing reliability, safety, and ease of maintenance, and for reducing weight, volume, and power consumption.

  15. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CEMS must be installed at both the inlet and outlet of the control device. If you are meeting a requirement to limit the concentration of CO, the CEMS must be installed at the outlet of the control device... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If...

  16. Partial-depth repair of jointed PCC pavements : cast-in-place and precast procedures.

    DOT National Transportation Integrated Search

    1977-01-01

    The installation of durable patches on jointed portland cement concrete pavement using several types of cast-in-place concrete, is described. The recommended procedures for pavement preparation and patch installation are given, and additional mainten...

  17. Economic effects of propulsion system technology on existing and future transport aircraft

    NASA Technical Reports Server (NTRS)

    Sallee, G. P.

    1974-01-01

    The results of an airline study of the economic effects of propulsion system technology on current and future transport aircraft are presented. This report represents the results of a detailed study of propulsion system operating economics. The study has four major parts: (1) a detailed analysis of current propulsion system maintenance with respect to the material and labor costs encountered versus years in service and the design characteristics of the major elements of the propulsion system of the B707, b727, and B747. (2) an analysis of the economic impact of a future representative 1979 propulsion system is presented with emphasis on depreciation of investment, fuel costs and maintenance costs developed on the basis of the analysis of the historical trends observed. (3) recommendations concerning improved methods of forecasting the maintenance cost of future propulsion systems are presented. A detailed method based on the summation of the projected labor and material repair costs for each major engine module and its installation along with a shorter form suitable for quick, less detailed analysis are presented, and (4) recommendations concerning areas where additional technology is needed to improve the economics of future commercial propulsion systems are presented along with the suggested economic benefits available from such advanced technology efforts.

  18. Laser vibrometry for wind turbines inspection

    NASA Astrophysics Data System (ADS)

    Ebert, R.

    2016-04-01

    The maintenance and repair of wind energy converters is a significant cost factor. Therefore it is mandatory to minimise the downtime caused by unnoticed faults. A key contributor to the load on the wind turbine installation and to material fatigue is the plant's unavoidable vibration. We report about a development of a new 1.5 μm laser vibrometer system to measure vibrations of rotating blades of wind turbines up to a distance of several hundred meters - based on a very precise imaged tracking system.

  19. 23 CFR 630.1002 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... mobility of road users and highway workers. These safety and mobility impacts are exacerbated by an aging... prescribes standards for the design, application, installation, and maintenance of traffic control devices for highway and street construction, maintenance operation, and utility work. In addition to the...

  20. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  1. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  2. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  3. Solar heating and cooling system installed at RKL Controls Company, Lumberton, New Jersey

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The final results of the design and operation of a computer controlled solar heated and cooled 40,000 square foot manufacturing building, sales office, and computer control center/display room are summarized. The system description, test data, major problems and resolutions, performance, operation and maintenance manual, equipment manufacturers' literature, and as-built drawings are presented. The solar system is composed of 6,000 square feet of flat plate collectors, external above ground storage subsystem, controls, absorption chiller, heat recovery, and a cooling tower.

  4. Evaluation of Installed Solar Systems at Navy, Army and Air Force Bases.

    DTIC Science & Technology

    1986-05-01

    8217 heVAting, space cooling, and domeistic hot \\\\.0tr I\\ Ntti lit t h \\ s it’ T all ill si/c tlitm smAll t\\%,t) collectr systems to large arra .\\i inti...sites and project personnel. NCEL project personnel were present at most but not all Navy evaluations. The purpose of the evaluations is to gain insight...of solar systems as well as to help develop preventive maintenance programs. The onsite inspections performed by LANL for the Navy and the other

  5. Measure Guideline: Heat Pump Water Heaters in New and Existing Homes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapiro, C.; Puttagunta, S.; Owens, D.

    2012-02-01

    This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. This document is intended to explore the issues surrounding heat pump water heaters (HPWHs) to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Heat pump water heaters (HPWHs) promise to significantly reduce energy consumption for domestic hot water (DHW) over standard electric resistance water heaters (ERWHs). While ERWHs perform with energy factors (EFs) around 0.9, new HPWHs boast EFs upwards of 2.0. High energy factors in HPWHs are achieved by combining a vapor compression system, which extracts heat from themore » surrounding air at high efficiencies, with electric resistance element(s), which are better suited to meet large hot water demands. Swapping ERWHs with HPWHs could result in roughly 50% reduction in water heating energy consumption for 35.6% of all U.S. households. This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. While HPWHs promise to significantly reduce energy use for DHW, proper installation, selection, and maintenance of HPWHs is required to ensure high operating efficiency and reliability. This document is intended to explore the issues surrounding HPWHs to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Section 1 of this guideline provides a brief description of HPWHs and their operation. Section 2 highlights the cost and energy savings of HPWHs as well as the variables that affect HPWH performance, reliability, and efficiency. Section 3 gives guidelines for proper installation and maintenance of HPWHs, selection criteria for locating HPWHs, and highlights of important differences between ERWH and HPWH installations. Throughout this document, CARB has included results from the evaluation of 14 heat pump water heaters (including three recently released HPWH products) installed in existing homes in the northeast region of the United States.« less

  6. Design and installation package for the Sunmat Flat Plate solar collector

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The information used in evaluating the design of a liquid flat plate solar collector is reported. Included in this package are subsystem performance specification, installation, operation and maintenance manuals, collector sizing guides, and detailed drawings of the single-glazed collector.

  7. Using solar-powered refrigeration for vaccine storage where other sources of reliable electricity are inadequate or costly.

    PubMed

    McCarney, Steve; Robertson, Joanie; Arnaud, Juliette; Lorenson, Kristina; Lloyd, John

    2013-12-09

    Large areas of many developing countries have no grid electricity. This is a serious challenge that threatens the continuity of the vaccine cold chain. The main alternatives to electrically powered refrigerators available for many years--kerosene- and gas-driven refrigerators--are plagued by problems with gas supply interruptions, low efficiency, poor temperature control, and frequent maintenance needs. There are currently no kerosene- or gas-driven refrigerators that qualify under the minimum standards established by the World Health Organization (WHO) Performance, Quality, and Safety (PQS) system. Solar refrigeration was a promising development in the early 1980s, providing an alternative to absorption technology to meet cold chain needs in remote areas. Devices generally had strong laboratory performance data; however, experience in the field over the years has been mixed. Traditional solar refrigerators relied on relatively expensive battery systems, which have demonstrated short lives compared to the refrigerator. There are now alternatives to the battery-based systems and a clear understanding that solar refrigerator systems need to be designed, installed, and maintained by technicians with the necessary knowledge and training. Thus, the technology is now poised to be the refrigeration method of choice for the cold chain in areas with no electricity or extremely unreliable electricity (less than 4h per average day) and sufficient sunlight. This paper highlights some lessons learned with solar-powered refrigeration, and discusses some critical factors for successful introduction of solar units into immunization programs in the future including: •Sustainable financing mechanisms and incentives for health workers and technicians are in place to support long-term maintenance, repair, and replacement parts. •System design is carried out by qualified solar refrigerator professionals taking into account the conditions at installation sites. •Installation and repair are conducted by well-trained technicians. •Temperature performance is continuously monitored and protocols are in place to act on data that indicate problems. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.

  8. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...

  9. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...

  10. Obstacle negotiation control for a mobile robot suspended on overhead ground wires by optoelectronic sensors

    NASA Astrophysics Data System (ADS)

    Zheng, Li; Yi, Ruan

    2009-11-01

    Power line inspection and maintenance already benefit from developments in mobile robotics. This paper presents mobile robots capable of crossing obstacles on overhead ground wires. A teleoperated robot realizes inspection and maintenance tasks on power transmission line equipment. The inspection robot is driven by 11 motor with two arms, two wheels and two claws. The inspection robot is designed to realize the function of observation, grasp, walk, rolling, turn, rise, and decline. This paper is oriented toward 100% reliable obstacle detection and identification, and sensor fusion to increase the autonomy level. An embedded computer based on PC/104 bus is chosen as the core of control system. Visible light camera and thermal infrared Camera are both installed in a programmable pan-and-tilt camera (PPTC) unit. High-quality visual feedback rapidly becomes crucial for human-in-the-loop control and effective teleoperation. The communication system between the robot and the ground station is based on Mesh wireless networks by 700 MHz bands. An expert system programmed with Visual C++ is developed to implement the automatic control. Optoelectronic laser sensors and laser range scanner were installed in robot for obstacle-navigation control to grasp the overhead ground wires. A novel prototype with careful considerations on mobility was designed to inspect the 500KV power transmission lines. Results of experiments demonstrate that the robot can be applied to execute the navigation and inspection tasks.

  11. General aviation avionics equipment maintenance

    NASA Technical Reports Server (NTRS)

    Parker, C. D.; Tommerdahl, J. B.

    1978-01-01

    Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.

  12. 23 CFR 660.519 - Missile installations and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... extraordinary maintenance as necessary to keep the roads serviceable and maintain adequate supporting records of... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...) Restoration under the contract. (1) The highway agency having jurisdiction over the road shall take...

  13. Flight service environmental effects on composite materials and structures

    NASA Technical Reports Server (NTRS)

    Dexter, H. Benson; Baker, Donald J.

    1992-01-01

    NASA Langley and the U.S. Army have jointly sponsored programs to assess the effects of realistic flight environments and ground-based exposure on advanced composite materials and structures. Composite secondary structural components were initially installed on commercial transport aircraft in 1973; secondary and primary structural components were installed on commercial helicopters in 1979; and primary structural components were installed on commercial aircraft in the mid-to-late 1980's. Service performance, maintenance characteristics, and residual strength of numerous components are reported. In addition to data on flight components, 10 year ground exposure test results on material coupons are reported. Comparison between ground and flight environmental effects for several composite material systems are also presented. Test results indicate excellent in-service performance with the composite components during the 15 year period. Good correlation between ground-based material performance and operational structural performance has been achieved.

  14. Development of an Automated Micro-Computer Knowledge-Based Integrated Configuration Management System for the Stock Point Logistics Integrated Communications Environment (SPLICE) Project Management Staff.

    DTIC Science & Technology

    1986-03-01

    Installation Cost Real Basic Monthly Maintenance Cost Real -" . I 2 ! UU LU uj ~~ LA . ~z LU J LLU 151 APPENDIX B: MAINTENANCE MANUAL Page 15 -LJ uLA- u’Il -LJ...bl 59748.0 9 09 NARDAC JACKSONVILLE, FL, 2 2 VIII A S 188471.0 10 10 NARDAC NEW ORLEANS, LA 2 2 P A S 73918.0 11 11 NARDAC NORFOLK, VA 2 2 VIII A S...1366 Beqin 1367 FOR Row =0 to 5 LWJ 1368 FOR Col 1 to 3 DO 1369 Beqin 1370 Subtotals [Row, Coll := 0; 1371 IF Col ( 3 TIEN Totals

  15. Modular control subsystems for use in solar heating systems for multi-family dwellings

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Progress in the development of solar heating modular control subsystems is reported. Circuit design, circuit drawings, and printed circuit board layout are discussed along with maintenance manuals, installation instructions, and verification and acceptance tests. Calculations made to determine the predicted performance of the differential thermostat are given including details and results of tests for the offset temperature, and boil and freeze protect points.

  16. Development and Implementation of Training Curriculum/Program in Solar Heating and Cooling at the Technician Level, December 1, 1976 - November 30, 1977. Final Report.

    ERIC Educational Resources Information Center

    Kuhnle, Carl J., Jr.

    The program proposal is designed to address the increasing demand for trained personnel to support the installation and maintenance of solar energy systems at residential and commercial sites. The three main objectives of the proposed program are: (1) to develop a flexible curricula to train a solar heating and cooling workforce; (2) to identify…

  17. Preliminary design review package on air flat plate collector for solar heating and cooling system

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Guidelines to be used in the development and fabrication of a prototype air flat plate collector subsystem containing 320 square feet (10-4 ft x 8 ft panels) of collector area are presented. Topics discussed include: (1) verification plan; (2) thermal analysis; (3) safety hazard analysis; (4) drawing list; (5) special handling, installation and maintenance tools; (6) structural analysis; and (7) selected drawings.

  18. Training Civil Engineering Enlisted Personnel Past, Present and Future

    DTIC Science & Technology

    1989-09-01

    engines, 90; diesel fuel injector systems, 60; exciters and alternators, 60; power plant installation, 60; power plant maintenance, 30; power centers, 30...ENGINEERING COURSES AND STUDENTS GRADUATED, MAY-JUNE 1946. Course Titles Weeks’ No. of Length Grads. Diesel Mechanic 8 58 Auto Equipment Mechanic 8 116...134 Power Shovel 105 Crawler Tractor 315 Miscellaneous and Well Driller 87 *Construction Technician 235 Crane Operator 66 * Diesel Mechanic 252

  19. Albuquerque Seismological Laboratory--50 years of global seismology

    USGS Publications Warehouse

    Hutt, C.R.; Peterson, Jon; Gee, Lind; Derr, John; Ringler, Adam; Wilson, David

    2011-01-01

    The U.S. Geological Survey Albuquerque Seismological Laboratory is about 15 miles southeast of Albuquerque on the Pueblo of Isleta, adjacent to Kirtland Air Force Base. The Albuquerque Seismological Laboratory supports the Global Seismographic Network Program and the Advanced National Seismic System through the installation, operation, and maintenance of seismic stations around the world and serves as the premier seismological instrumentation test facility for the U.S. Government.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Easton, C. R.

    The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less

Top