Sample records for system integration project

  1. Meeting of Experts on NASA's Unmanned Aircraft System (UAS) Integration in the National Airspace Systems (NAS) Project

    NASA Technical Reports Server (NTRS)

    Wolfe, Jean; Bauer, Jeff; Bixby, C.J.; Lauderdale, Todd; Shively, Jay; Griner, James; Hayhurst, Kelly

    2010-01-01

    Topics discussed include: Aeronautics Research Mission Directorate Integrated Systems Research Program (ISRP) and UAS Integration in the NAS Project; UAS Integration into the NAS Project; Separation Assurance and Collision Avoidance; Pilot Aircraft Interface Objectives/Rationale; Communication; Certification; and Integrated Tests and Evaluations.

  2. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  3. The SIMPSONS project: An integrated Mars transportation system

    NASA Astrophysics Data System (ADS)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  4. The SIMPSONS project: An integrated Mars transportation system

    NASA Technical Reports Server (NTRS)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    1992-01-01

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  5. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project Subcommittee Final

    NASA Technical Reports Server (NTRS)

    Johnson, Chuck; Griner, James H.; Hayhurst, Kelly J.; Shively, Robert J.; Consiglio, Maria; Muller, Eric; Murphy, James; Kim, Sam

    2012-01-01

    UAS Integration in the NAS Project overview with details from each of the subprojects. Subprojects include: Communications, Certification, Integrated Test and Evaluation, Human Systems Integration, and Separation Assurance/Sense and Avoid Interoperability.

  6. NASA UAS Integration into the NAS Project: Human Systems Integration

    NASA Technical Reports Server (NTRS)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  7. Research a Novel Integrated and Dynamic Multi-object Trade-Off Mechanism in Software Project

    NASA Astrophysics Data System (ADS)

    Jiang, Weijin; Xu, Yuhui

    Aiming at practical requirements of present software project management and control, the paper presented to construct integrated multi-object trade-off model based on software project process management, so as to actualize integrated and dynamic trade-oil of the multi-object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi-object trade-off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects, emphatically discussed the integrated and dynamic multi- object trade-off model and corresponding rules and mechanism in order to realize integration of process management and trade-off of multi-object system.

  8. ESIF Call for High-Impact Integrated Projects | Energy Systems Integration

    Science.gov Websites

    Integrated Projects As a U.S. Department of Energy user facility, the Energy Systems Integration Facility concepts, tools, and technologies needed to measure, analyze, predict, protect, and control the grid of the Facility | NREL ESIF Call for High-Impact Integrated Projects ESIF Call for High-Impact

  9. Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

    NASA Technical Reports Server (NTRS)

    Thomas, Leann; Utley, Dawn

    2006-01-01

    While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

  10. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    NASA Astrophysics Data System (ADS)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  11. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  12. An integrated knowledge system for wind tunnel testing - Project Engineers' Intelligent Assistant

    NASA Technical Reports Server (NTRS)

    Lo, Ching F.; Shi, George Z.; Hoyt, W. A.; Steinle, Frank W., Jr.

    1993-01-01

    The Project Engineers' Intelligent Assistant (PEIA) is an integrated knowledge system developed using artificial intelligence technology, including hypertext, expert systems, and dynamic user interfaces. This system integrates documents, engineering codes, databases, and knowledge from domain experts into an enriched hypermedia environment and was designed to assist project engineers in planning and conducting wind tunnel tests. PEIA is a modular system which consists of an intelligent user-interface, seven modules and an integrated tool facility. Hypermedia technology is discussed and the seven PEIA modules are described. System maintenance and updating is very easy due to the modular structure and the integrated tool facility provides user access to commercial software shells for documentation, reporting, or database updating. PEIA is expected to provide project engineers with technical information, increase efficiency and productivity, and provide a realistic tool for personnel training.

  13. Reengineering outcomes management: an integrated approach to managing data, systems, and processes.

    PubMed

    Neuman, K; Malloch, K; Ruetten, V

    1999-01-01

    The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.

  14. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Systems Integration and Operationalization (SIO) Demonstration

    NASA Technical Reports Server (NTRS)

    Swieringa, Kurt

    2018-01-01

    The UAS-NAS Project hosted a Systems Integration Operationalization (SIO) Industry Day for the SIO Request for Information (RFI) on November 30, 2017 in San Diego, California. This presentation is being presented to the same group as a follow up regarding the progress that the UAS-NAS project has made on the SIO RFI. The presentation will be virtual with a teleconference

  15. Project for Integration of Pupils with Special Needs in Spain.

    ERIC Educational Resources Information Center

    Marchesi, Alvaro

    1986-01-01

    This paper analyzes a project approved by the Spanish government in 1985 to integrate special needs children into regular education. Outlined are characteristics of the Spanish educational system, parameters of practice in the integration project, and plans for the systematic evaluation of the integration project. (Author/JDD)

  16. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  17. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    NASA Technical Reports Server (NTRS)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  18. UAS-NAS Stakeholder Feedback Report

    NASA Technical Reports Server (NTRS)

    Randall, Debra; Murphy, Jim; Grindle, Laurie

    2016-01-01

    The need to fly UAS in the NAS to perform missions of vital importance to national security and defense, emergency management, science, and to enable commercial applications has been continually increasing over the past few years. To address this need, the NASA Aeronautics Research Mission Directorate (ARMD) Integrated Aviation Systems Program (IASP) formulated and funded the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project (hereafter referred to as UAS-NAS Project) from 2011 to 2016. The UAS-NAS Project identified the following need statement: The UAS community needs routine access to the global airspace for all classes of UAS. The Project identified the following goal: To provide research findings to reduce technical barriers associated with integrating UAS into the NAS utilizing integrated system level tests in a relevant environment. This report provides a summary of the collaborations between the UAS-NAS Project and its primary stakeholders and how the Project applied and incorporated the feedback.

  19. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as

  20. Microgrid Controls | Grid Modernization | NREL

    Science.gov Websites

    Systems Integration Facility. Microgrid Controller Interaction with Distribution Management Systems This project investigates the interaction of distribution management systems with local controllers, including microgrid controllers. The project is developing integrated control and management systems for distribution

  1. I-15 integrated corridor management system : project management plan.

    DOT National Transportation Integrated Search

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...

  2. Development of the advanced life support Systems Integration Research Facility at NASA's Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Tri, Terry O.; Thompson, Clifford D.

    1992-01-01

    Future NASA manned missions to the moon and Mars will require development of robust regenerative life support system technologies which offer high reliability and minimal resupply. To support the development of such systems, early ground-based test facilities will be required to demonstrate integrated, long-duration performance of candidate regenerative air revitalization, water recovery, and thermal management systems. The advanced life support Systems Integration Research Facility (SIRF) is one such test facility currently being developed at NASA's Johnson Space Center. The SIRF, when completed, will accommodate unmanned and subsequently manned integrated testing of advanced regenerative life support technologies at ambient and reduced atmospheric pressures. This paper provides an overview of the SIRF project, a top-level description of test facilities to support the project, conceptual illustrations of integrated test article configurations for each of the three SIRF systems, and a phased project schedule denoting projected activities and milestones through the next several years.

  3. UAS Integration in the NAS Project: Integrated Test and LVC Infrastructure

    NASA Technical Reports Server (NTRS)

    Murphy, Jim; Hoang, Ty

    2015-01-01

    Overview presentation of the Integrated Test and Evaluation sub-project of the Unmanned Aircraft System (UAS) in the National Airspace System (NAS). The emphasis of the presentation is the Live, Virtual, and Constructive (LVC) system (a broadly used name for classifying modeling and simulation) infrastructure and use of external assets and connection.

  4. Aeronautics Research Mission Directorate Integrated Systems Research Program (ISRP) and UAS Integration in the NAS Project

    NASA Technical Reports Server (NTRS)

    Wolfe, Jean

    2010-01-01

    Program Goal: Conduct research at an integrated system-level on promising concepts and technologies and explore, assess, or demonstrate the benefits in a relevant environment.Criteria for selection of projects for Integrated Systems Research: a) Technology has attained enough maturity in the foundational research program that they merit more in-depth evaluation at an integrated system level in a relevant environment. b) Technologies which systems analysis indicates have the most potential for contributing to the simultaneous attainment of goals. c) Technologies identified through stakeholder input as having potential for simultaneous attainment of goals. d) Research not being done by other government agencies and appropriate for NASA to conduct. e) Budget augmentation. Environmentally Responsible Aviation (ERA) Project Explore and assess new vehicle concepts and enabling technologies through system-level experimentation to simultaneously reduce fuel burn, noise, and emissions Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project Contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS Innovative Concepts for Green Aviation (ICGA) Project Spur innovation by offering research opportunities to the broader aeronautics community through peer-reviewed proposals, with a focus on making aviation more eco-friendly. Establish incentive prizes similar to the Centennial Challenges and sponsor innovation demonstrations of selected technologies that show promise of reducing aviation s impact on the environment

  5. Systems integrated human engineering on the Navy's rapid acquisition of manufactured parts/test and integration facility

    NASA Technical Reports Server (NTRS)

    Gallaway, Glen R.

    1987-01-01

    Human Engineering in many projects is at best a limited support function. In this Navy project the Human Engineering function is an integral component of the systems design and development process. Human Engineering is a member of the systems design organization. This ensures that people considerations are: (1) identified early in the project; (2) accounted for in the specifications; (3) incorporated into the design; and (4) the tested product meets the needs and expectations of the people while meeting the overall systems requirements. The project exemplifies achievements that can be made by the symbiosis between systems designers, engineers and Human Engineering. This approach increases Human Engineering's effectiveness and value to a project because it becomes an accepted, contributing team member. It is an approach to doing Human Engineering that should be considered for most projects. The functional and organizational issues giving this approach strength are described.

  6. Educational Systems Integrators/Integrated Learning System Project: Titan Schools 1993-94. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    The 1993-94 Integrated Learning System (ILS) project, a means of delivering individualized instruction through a computer network, involved approximately 70 schools from New York City school districts. To help schools learn about and operate the technology in an ILS, districts were given the option of hiring one of the following companies…

  7. Sensitivities of projected 1980 photovoltaic system costs to major system cost drivers

    NASA Technical Reports Server (NTRS)

    Zimmerman, L. W.; Smith, J. L.

    1984-01-01

    The sensitivity of projected 1990 photovoltaic (PV) system costs to major system cost drivers was examined. It includes: (1) module costs and module efficiencies; (2) area related balance of system (BOS) costs; (3) inverter costs and efficiencies; and (4) module marketing and distribution markups and system integration fees. Recent PV system cost experiences and the high costs of electricity from the systems are reviewed. The 1990 system costs are projected for five classes of PV systems, including four ground mounted 5-MWp systems and one residential 5-kWp system. System cost projections are derived by first projecting costs and efficiencies for all subsystems and components. Sensitivity analyses reveal that reductions in module cost and engineering and system integration fees seem to have the greatest potential for contributing to system cost reduction. Although module cost is clearly the prime candidate for fruitful PV research and development activities, engineering and system integration fees seem to be more amenable to reduction through appropriate choice of system size and market strategy. Increases in inverter and module efficiency yield significant benefits, especially for systems with high area related costs.

  8. Operations system administration plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources,more » Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.« less

  9. NASA's UAS NAS Access Project

    NASA Technical Reports Server (NTRS)

    Johnson, Charles W.

    2011-01-01

    The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.

  10. US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    This document is intended as a listing and discussion of the Requirements for the US-75 Integrated Corridor Management System (ICMS) Demonstration Project in Dallas. This document describes what the system is to do (the functional requirements), how ...

  11. A case study : Georgia's intelligent transportation system : NAVIGATOR systems integrator contract -- use of a systems integrator to manage ITS implementation

    DOT National Transportation Integrated Search

    2000-03-01

    This case study is one of a series of case studies that examine procurement approaches used to deliver Intelligent Transportation System (ITS) projects. ITS projects are often complex and leverage the latest technology in telecommunications, computer...

  12. Demonstrating artificial intelligence for space systems - Integration and project management issues

    NASA Technical Reports Server (NTRS)

    Hack, Edmund C.; Difilippo, Denise M.

    1990-01-01

    As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

  13. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    DOE-funded research projects that are integrating cybersecurity controls with power systems principles Management, a hardware and software system that mimics the communications, power systems, and cybersecurity

  14. Technical support plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The PassPort (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, and Purchasing. The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources, Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HAND1 2000 Project, is referred to asmore » Business Management System (BMS) and Chemical Management.« less

  15. Human Systems Integration in Practice: Constellation Lessons Learned

    NASA Technical Reports Server (NTRS)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

  16. Experience with an integrated control and monitoring system at the El Segundo generating station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Papilla, R.P.; McKinley, J.H.; Blanco, M.A.

    1992-01-01

    This paper describes the EPRI/Southern California Edison (SCE) El Segundo Integrated Control and Monitoring System (ICMS) project and relates key project experiences. The ICMS project is a cost-shared effort between EPRI and SCE designed to address the issues involved with integrating power plant diagnostic and condition monitoring with control. A digital distributed control system retrofit for SCE's El Segundo Units 3 and 4 provided the case study. although many utilities have retrofitted power plant units with distributed control systems (DCS's) and have applied diagnostics and monitoring programs to improve operations and performance, the approach taken in this project, that is,more » integrating the monitoring function with the control function, is profoundly new and unique. Over the life of the El Segundo ICMS, SCE expects to realize savings form life optimization, increased operating flexibility, improved heat rate, reduced NO{sub x} emissions, and lower maintenance costs. These savings are expected to be significant over the life of the system.« less

  17. NEXT Single String Integration Test Results

    NASA Technical Reports Server (NTRS)

    Soulas, George C.; Patterson, Michael J.; Pinero, Luis; Herman, Daniel A.; Snyder, Steven John

    2010-01-01

    As a critical part of NASA's Evolutionary Xenon Thruster (NEXT) test validation process, a single string integration test was performed on the NEXT ion propulsion system. The objectives of this test were to verify that an integrated system of major NEXT ion propulsion system elements meets project requirements, to demonstrate that the integrated system is functional across the entire power processor and xenon propellant management system input ranges, and to demonstrate to potential users that the NEXT propulsion system is ready for transition to flight. Propulsion system elements included in this system integration test were an engineering model ion thruster, an engineering model propellant management system, an engineering model power processor unit, and a digital control interface unit simulator that acted as a test console. Project requirements that were verified during this system integration test included individual element requirements ; integrated system requirements, and fault handling. This paper will present the results of these tests, which include: integrated ion propulsion system demonstrations of performance, functionality and fault handling; a thruster re-performance acceptance test to establish baseline performance: a risk-reduction PMS-thruster integration test: and propellant management system calibration checks.

  18. Architecture of a prehospital emergency patient care report system (PEPRS).

    PubMed

    Majeed, Raphael W; Stöhr, Mark R; Röhrig, Rainer

    2013-01-01

    In recent years, prehospital emergency care adapted to the technology shift towards tablet computers and mobile computing. In particular, electronic patient care report (e-PCR) systems gained considerable attention and adoption in prehospital emergency medicine [1]. On the other hand, hospital information systems are already widely adopted. Yet, there is no universal solution for integrating prehospital emergency reports into electronic medical records of hospital information systems. Previous projects either relied on proprietary viewing workstations or examined and transferred only data for specific diseases (e.g. stroke patients[2]). Using requirements engineering and a three step software engineering approach, this project presents a generic architecture for integrating prehospital emergency care reports into hospital information systems. Aim of this project is to describe a generic architecture which can be used to implement data transfer and integration of pre hospital emergency care reports to hospital information systems. In summary, the prototype was able to integrate data in a standardized manner. The devised methods can be used design generic software for prehospital to hospital data integration.

  19. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address safety and operational challenges of national airspace access by unmanned aircraft systems, or UAS. In the process, the project will work with other key stakeholders to define necessary deliverables and products to help enable such access. Within the project, NASA is focusing on five sub-projects. These five focus areas include assurance of safe separation of unmanned aircraft from manned aircraft when flying in the national airspace; safety-critical command and control systems and radio frequencies to enable safe operation of UAS; human factors issues for ground control stations; airworthiness certification standards for UAS avionics and integrated tests and evaluation designed to determine the viability of emerging UAS technology. Five Focus Areas of the UAS Integration in the NAS Project Separation Assurance Provide an assessment of how planned Next Generation Air Transportation System (NextGen) separation assurance systems, with different functional allocations, perform for UAS in mixed operations with manned aircraft Assess the applicability to UAS and the performance of NASA NextGen separation assurance systems in flight tests with realistic latencies and uncertain trajectories Assess functional allocations ranging from today's ground-based, controller-provided aircraft separation to fully autonomous airborne self-separation Communications Develop data and rationale to obtain appropriate frequency spectrum allocations to enable safe and efficient operation of UAS in the NAS Develop and validate candidate secure safety-critical command and control system/subsystem test equipment for UAS that complies with UAS international/national frequency regulations, standards and recommended practices and minimum operational and aviation system performance standards for UAS Perform analysis to support recommendations for integration of safety-critical command and control systems and air traffic control communications to ensure safe and efficient operation of UAS in the NAS Human Systems Integration Develop a research test bed and database to provide data and proof of concept for GCS - ground control station - operations in the NAS Coordinate with standards organizations to develop human-factors guidelines for GCS operation in the NAS Certification Define a UAS classification scheme and approach to determining Federal Aviation Regulation airworthiness requirements applicable to all UAS digital avionics Provide hazard and risk-related data to support development of type design criteria and best development practices Integrated Tests and Evaluation Integrate and test mature concepts from technical elements to demonstrate and test viability Evaluate the performance of technology development in a relevant environment (full-mission, human-in-the-loop simulations and flight tests)

  20. U.S. Department of Transportation's summary of Intelligent Transportation System (ITS) integration projects

    DOT National Transportation Integrated Search

    2006-01-01

    This document provides summarized information on Intelligent Transportation Systems (ITS) projects initiated as a result of the enactment of the ITS Integration Component of the ITS Deployment Program as defined in Section 5208 of the Transportation ...

  1. UAS Integration in the NAS Project - FY 14 Annual Review

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Randall, Debra; Hackenberg, Davis

    2014-01-01

    This briefing gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS Projects progress and future directions.

  2. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sajadi, Amirhossein; Loparo, Kenneth A.; D'Aquila, Robert

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods tomore » quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.« less

  3. System integration case study : FAST-TRAC : preliminary IV deliverable : #2-systems integration case study

    DOT National Transportation Integrated Search

    1999-02-12

    This report focuses on the system integration aspect of the Transportation Information Management System (TIMS), a component of the FAST-TRAC project. The TIMS functions as the center of a communications network which integrates advanced traffic cont...

  4. The Habitat Demonstration Unit Project Overview

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S.

    2010-01-01

    This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process.

  5. Case study and lessons learned for the Great Lakes ITS Program, Airport ITS Integration and the Road Infrastructure Management System projects, final report, Wayne County, Michigan

    DOT National Transportation Integrated Search

    2007-03-02

    This report presents the case study and lessons learned for the national evaluation of the Great Lakes Intelligent Transportation Systems (GLITS) Airport ITS Integration and Road Infrastructure Management System (RIMS) projects. The Airport ITS Integ...

  6. Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

    NASA Technical Reports Server (NTRS)

    Dubon, Lydia P.

    2006-01-01

    The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

  7. The implementation of the Human Exploration Demonstration Project (HEDP), a systems technology testbed

    NASA Technical Reports Server (NTRS)

    Rosen, Robert; Korsmeyer, David J.

    1993-01-01

    The Human Exploration Demonstration Project (HEDP) is an ongoing task at the NASA's Ames Research Center to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary surface habitat. The integrated environment consists of life support systems, physiological monitoring of project crew, a virtual environment work station, and centralized data acquisition and habitat systems health monitoring. The HEDP is an integrated technology demonstrator, as well as an initial operational testbed. There are several robotic systems operational in a simulated planetary landscape external to the habitat environment, to provide representative work loads for the crew. This paper describes the evolution of the HEDP from initial concept to operational project; the status of the HEDP after two years; the final facilities composing the HEDP; the project's role as a NASA Ames Research Center systems technology testbed; and the interim demonstration scenarios that have been run to feature the developing technologies in 1993.

  8. Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

    NASA Technical Reports Server (NTRS)

    Dubon, Lydia P.

    2006-01-01

    The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

  9. UAS Integration in the NAS Project: Integrated Test and Evaluation (IT&E) Flight Test 3. Revision E

    NASA Technical Reports Server (NTRS)

    Marston, Michael

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

  10. Center for Ground Vehicle Development and Integration

    DTIC Science & Technology

    2011-04-22

    UNCLASSIFIED OPSEC# 21798 CGVDI Organizational Chart CGVDI Director Project and Operations Management Project Management Operations Management Engineered...Metals Welding Assembly / Paint UNCLASSIFIED UNCLASSIFIED OPSEC# 21798 Project and Operations Management CGVDI serves as a single entry point to RDECOM...for ground vehicle system integration projects, as well as for managing cost, schedule, performance and risk. Project Management Operations

  11. Marshall Space Flight Center Ground Systems Development and Integration

    NASA Technical Reports Server (NTRS)

    Wade, Gina

    2016-01-01

    Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.

  12. NASA Integrated Systems Research with an Environmental Focus

    NASA Technical Reports Server (NTRS)

    Wolfe, Jean; Collier, Fay

    2010-01-01

    This slide presentation reviews the Integrated Systems Research Program (ISRP) with a focus on the work being done on reduction of environmental impact from aeronautics. The focus of the ISRP is to Conduct research at an integrated system-level on promising concepts and technologies and explore, assess, or demonstrate the benefits in a relevant environment. The presentation reviews the criteria for an ISRP project, and discusses the Environmentally Responsible Aviation (ERA) project, and the technical challenges.

  13. Energy Systems Integration: Demonstrating Distribution Feeder Voltage Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2017-01-01

    Overview fact sheet about the Smarter Grid Solutions Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project at the Energy Systems Integration Facility. INTEGRATE is part of the U.S. Department of Energy's Grid Modernization Initiative.

  14. Energy Systems Integration: Demonstrating Distributed Grid-Edge Control Hierarchy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2017-01-01

    Overview fact sheet about the OMNETRIC Group Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project at the Energy Systems Integration Facility. INTEGRATE is part of the U.S. Department of Energy's Grid Modernization Initiative.

  15. Integrated Library System (ILS) Challenges and Opportunities: A Survey of U.S. Academic Libraries with Migration Projects

    ERIC Educational Resources Information Center

    Wang, Zhonghong

    2009-01-01

    An online survey was sent to academic libraries and consortia with an integrated library system (ILS) migration project, based on review of press releases from major U.S. ILS vendors. This study takes a systematic approach to provide a snapshot of the academic ILS market and key factors affecting the outcome of an ILS migration project. It reveals…

  16. The Integration of Multi-State Clarus Data into Data Visualization Tools

    DOT National Transportation Integrated Search

    2011-12-20

    This project focused on the integration of all Clarus Data into the Regional Integrated Transportation Information System (RITIS) for real-time situational awareness and historical safety data analysis. The initial outcomes of this project are the fu...

  17. Metropolitan transportation management center : a case study : Boston Central Artery/Tunnel Integrated Project control system : responding to incidents rapidly and effectively

    DOT National Transportation Integrated Search

    1999-10-01

    The following case study provides a snapshot of the Boston Central Artery/Tunnel Integration Project Control System (IPCS) operations control center. It follows the outline provided in the companion document, Metropolitan Transportation Management Ce...

  18. Options of system integrated environment modelling in the predicated dynamic cyberspace

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janková, Martina; Dvořák, Jiří

    In this article there are briefly mentioned some selected options of contemporary conception of cybernetic system models in the corresponding and possible integratable environment with modern system dynamics thinking and all this in the cyberspace of possible projecting of predicted system characteristics. The key to new capabilities of system integration modelling in the considered cyberspace is mainly the ability to improve the environment and the system integration options, all this with the aim of modern control in the hierarchically arranged dynamic cyberspace, e.g. in the currently desired electronic business with information. The aim of this article is to assess generallymore » the trends in the use of modern modelling methods considering the cybernetics applications verified in practice, modern concept of project management and also the potential integration of artificial intelligence in the new projecting and project management of integratable and intelligent models, e.g. with the optimal structures and adaptable behaviour.The article results from the solution of a specific research partial task at the faculty; especially the moments proving that the new economics will be based more and more on information, knowledge system defined cyberspace of modern management, are stressed in the text.« less

  19. Integrating Engineering Data Systems for NASA Spaceflight Projects

    NASA Technical Reports Server (NTRS)

    Carvalho, Robert E.; Tollinger, Irene; Bell, David G.; Berrios, Daniel C.

    2012-01-01

    NASA has a large range of custom-built and commercial data systems to support spaceflight programs. Some of the systems are re-used by many programs and projects over time. Management and systems engineering processes require integration of data across many of these systems, a difficult problem given the widely diverse nature of system interfaces and data models. This paper describes an ongoing project to use a central data model with a web services architecture to support the integration and access of linked data across engineering functions for multiple NASA programs. The work involves the implementation of a web service-based middleware system called Data Aggregator to bring together data from a variety of systems to support space exploration. Data Aggregator includes a central data model registry for storing and managing links between the data in disparate systems. Initially developed for NASA's Constellation Program needs, Data Aggregator is currently being repurposed to support the International Space Station Program and new NASA projects with processes that involve significant aggregating and linking of data. This change in user needs led to development of a more streamlined data model registry for Data Aggregator in order to simplify adding new project application data as well as standardization of the Data Aggregator query syntax to facilitate cross-application querying by client applications. This paper documents the approach from a set of stand-alone engineering systems from which data are manually retrieved and integrated, to a web of engineering data systems from which the latest data are automatically retrieved and more quickly and accurately integrated. This paper includes the lessons learned through these efforts, including the design and development of a service-oriented architecture and the evolution of the data model registry approaches as the effort continues to evolve and adapt to support multiple NASA programs and priorities.

  20. Developing integrated parametric planning models for budgeting and managing complex projects

    NASA Technical Reports Server (NTRS)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  1. A Policy Guide on Integrated Care (PGIC): Lessons Learned from EU Project INTEGRATE and Beyond

    PubMed Central

    Devroey, Dirk

    2017-01-01

    Efforts are underway in many European countries to channel efforts into creating improved integrated health and social care services. But most countries lack a strategic plan that is sustainable over time, and that reflects a comprehensive systems perspective. The Policy Guide on Integrated Care (PGIC) as presented in this paper resulted from experiences with the EU Project INTEGRATE and our own work with healthcare reform for patients with chronic conditions at the national and international level. This project is one of the largest EU funded projects on Integrated Care, conducted over a four-year period (2012–2016) and included partners from nine European countries. Project Integrate aimed to gain insights into the leadership, management and delivery of integrated care to support European care systems to respond to the challenges of ageing populations and the rise of people living with long-term conditions. The objective of this paper is to describe the PGIC as both a tool and a reasoning flow that aims at supporting policy makers at the national and international level with the development and implementation of integrated care. Any Policy Guide on Integrated should build upon three building blocks, being a mission, vision and a strategy that aim at capturing the large amount of factors that directly or indirectly influence the successful development of integrated care. PMID:29588631

  2. A Policy Guide on Integrated Care (PGIC): Lessons Learned from EU Project INTEGRATE and Beyond.

    PubMed

    Borgermans, Liesbeth; Devroey, Dirk

    2017-09-25

    Efforts are underway in many European countries to channel efforts into creating improved integrated health and social care services. But most countries lack a strategic plan that is sustainable over time, and that reflects a comprehensive systems perspective. The Policy Guide on Integrated Care (PGIC) as presented in this paper resulted from experiences with the EU Project INTEGRATE and our own work with healthcare reform for patients with chronic conditions at the national and international level. This project is one of the largest EU funded projects on Integrated Care, conducted over a four-year period (2012-2016) and included partners from nine European countries. Project Integrate aimed to gain insights into the leadership, management and delivery of integrated care to support European care systems to respond to the challenges of ageing populations and the rise of people living with long-term conditions. The objective of this paper is to describe the PGIC as both a tool and a reasoning flow that aims at supporting policy makers at the national and international level with the development and implementation of integrated care. Any Policy Guide on Integrated should build upon three building blocks, being a mission, vision and a strategy that aim at capturing the large amount of factors that directly or indirectly influence the successful development of integrated care.

  3. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    Renewable Generation Integration Study (ERGIS), looks ahead to the year 2026 and examines how the Eastern accurately modeling the entire system at five-minute intervals for an entire year has never even been Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project, up to

  4. Energy Systems Integration: Demonstrating Distributed Resource Communications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2017-01-01

    Overview fact sheet about the Electric Power Research Institute (EPRI) and Schneider Electric Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project at the Energy Systems Integration Facility. INTEGRATE is part of the U.S. Department of Energy's Grid Modernization Initiative.

  5. Local evaluation report : state of Alabama (2001), automated crash notification system, UAB

    DOT National Transportation Integrated Search

    2005-01-01

    This project is the pilot phase of a longer-term project to integrate ACN and AACN technology into a comprehensive trauma system. Such a system exists in Alabamas central Birmingham Regional EMS System (BREMSS). The project involves three tasks: t...

  6. Joint-operation in water resources project in Indonesia: Integrated or non-integrated

    NASA Astrophysics Data System (ADS)

    Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny

    2017-11-01

    The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.

  7. Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success

    DTIC Science & Technology

    2009-09-01

    comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to

  8. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 1 : outreach and commercialization of IRSV prototype.

    DOT National Transportation Integrated Search

    2012-03-01

    The Integrated Remote Sensing and Visualization System (IRSV) was developed in Phase One of this project in order to : accommodate the needs of todays Bridge Engineers at the state and local level. Overall goals of this project are: : Better u...

  9. Choosing the Right Integrator for Your Building Automation Project.

    ERIC Educational Resources Information Center

    Podgorski, Will

    2002-01-01

    Examines the prevailing definitions and responsibilities of product, network, and system integrators for building automation systems; offers a novel approach to system integration; and sets realistic expectations for the owner in terms of benefits, outcomes, and overall values. (EV)

  10. Energy Systems Integration Newsletter | Energy Systems Integration Facility

    Science.gov Websites

    simulated sequences based on a model network. The competitive procurement process provided comparative , procurement help, design reviews, and now construction support. Miramar project support is part of integrated

  11. A Symbiosis between Instructional Systems Design and Project Management

    ERIC Educational Resources Information Center

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  12. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  13. Oregon regional intelligent transportation systems (ITS) integration program. Final phase III report, I-5/Barbur Boulevard Parallel Corridor Traffic Management Demonstration Project

    DOT National Transportation Integrated Search

    2005-07-01

    This report presents the results of the evaluation of the I-5/Barbur Boulevard Parallel Corridor Traffic Management Demonstration Project, a cooperative project between the Oregon Department of Transportation (ODOT) and the City of Portland to integr...

  14. Enhancing Knowledge Integration: An Information System Capstone Project

    ERIC Educational Resources Information Center

    Steiger, David M.

    2009-01-01

    This database project focuses on learning through knowledge integration; i.e., sharing and applying specialized (database) knowledge within a group, and combining it with other business knowledge to create new knowledge. Specifically, the Tiny Tots, Inc. project described below requires students to design, build, and instantiate a database system…

  15. A project management system for the X-29A flight test program

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  16. A Systems Development Life Cycle Project for the AIS Class

    ERIC Educational Resources Information Center

    Wang, Ting J.; Saemann, Georgia; Du, Hui

    2007-01-01

    The Systems Development Life Cycle (SDLC) project was designed for use by an accounting information systems (AIS) class. Along the tasks in the SDLC, this project integrates students' knowledge of transaction and business processes, systems documentation techniques, relational database concepts, and hands-on skills in relational database use.…

  17. UAS Integration in the NAS: Detect and Avoid

    NASA Technical Reports Server (NTRS)

    Shively, Jay

    2018-01-01

    This presentation will cover the structure of the unmanned aircraft systems (UAS) integration into the national airspace system (NAS) project (UAS-NAS Project). The talk also details the motivation of the project to help develop standards for a detect-and-avoid (DAA) system, which is required in order to comply with requirements in manned aviation to see-and-avoid other traffic so as to maintain well clear. The presentation covers accomplishments reached by the project in Phase 1 of the research, and touches on the work to be done in Phase 2. The discussion ends with examples of the display work developed as a result of the Phase 1 research.

  18. Structured approaches to large-scale systems: Variational integrators for interconnected Lagrange-Dirac systems and structured model reduction on Lie groups

    NASA Astrophysics Data System (ADS)

    Parks, Helen Frances

    This dissertation presents two projects related to the structured integration of large-scale mechanical systems. Structured integration uses the considerable differential geometric structure inherent in mechanical motion to inform the design of numerical integration schemes. This process improves the qualitative properties of simulations and becomes especially valuable as a measure of accuracy over long time simulations in which traditional Gronwall accuracy estimates lose their meaning. Often, structured integration schemes replicate continuous symmetries and their associated conservation laws at the discrete level. Such is the case for variational integrators, which discretely replicate the process of deriving equations of motion from variational principles. This results in the conservation of momenta associated to symmetries in the discrete system and conservation of a symplectic form when applicable. In the case of Lagrange-Dirac systems, variational integrators preserve a discrete analogue of the Dirac structure preserved in the continuous flow. In the first project of this thesis, we extend Dirac variational integrators to accommodate interconnected systems. We hope this work will find use in the fields of control, where a controlled system can be thought of as a "plant" system joined to its controller, and in the approach of very large systems, where modular modeling may prove easier than monolithically modeling the entire system. The second project of the thesis considers a different approach to large systems. Given a detailed model of the full system, can we reduce it to a more computationally efficient model without losing essential geometric structures in the system? Asked without the reference to structure, this is the essential question of the field of model reduction. The answer there has been a resounding yes, with Principal Orthogonal Decomposition (POD) with snapshots rising as one of the most successful methods. Our project builds on previous work to extend POD to structured settings. In particular, we consider systems evolving on Lie groups and make use of canonical coordinates in the reduction process. We see considerable improvement in the accuracy of the reduced model over the usual structure-agnostic POD approach.

  19. Using Systems Thinking to Frame the Evaluation of a Complex Educational Intervention

    NASA Astrophysics Data System (ADS)

    Kastens, K. A.; Baldassari, C.; DeLisi, J.; Manduca, C. A.

    2014-12-01

    InTeGrate (serc.carleton.edu/integrate/) is the geoscience component of NSF's STEM Talent Expansion Center program. As such, it is a $10M, 5 year effort, with dual goals of improving undergraduate STEM education and addressing an important national challenge, which in InTeGrate's case is environmental sustainability. InTeGrate is very complicated, involving five PI's, dozens of curriculum developers, scores of workshops and webinars, hundreds of faculty, and thousands of students. To get a handle on this complexity, the leadership team and evaluators are viewing project activities and outcomes through a system thinking lens, analogous to how geoscientists view the Earth system. For each major component of the project, we have a flowchart logic model that traces the flows of information, materials, influence, and people that are thought to result from project activities. As is to be expected in a complex system, individual activities are often influenced by multiple inputs and contribute to multiple outputs. The systems approach allows us to spot critical points in the system where evaluative probes are needed; for example, are workshops actually resulting in a flux of new people into roles of increased responsibility within InTeGrate as intended? InTeGrate is permeated with opportunities for participants to engage in assessment, reflection and peer-review. From a systems perspective, this evaluative culture can be seen as an effort to create reinforcing feedback loops for processes that advance InTeGrate's values. For example, assessment team members review draft instructional materials against a materials development rubric and coach developers through an iterative development cycle towards materials that embody InTeGrate's priorities. Of particular interest are flows of information or influence that may carry InTeGrate's impact outward in space and time beyond activities that are directly funded by the project. For example, positive experiences during materials development may influence developers' teaching practice such that they embed InTeGrate's methods into their teaching of non-InTeGrate materials and advocate for InTeGrate methods on their campuses. Only if such influence pathways exist will InTeGrate be able to achieve national and enduring impact.

  20. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  1. Relational systems change: implementing a model of change in integrating services for women with substance abuse and mental health disorders and histories of trauma.

    PubMed

    Markoff, Laurie S; Finkelstein, Norma; Kammerer, Nina; Kreiner, Peter; Prost, Carol A

    2005-01-01

    This article describes the "relational systems change" model developed by the Institute for Health and Recovery, and the implementation of the model in Massachusetts from 1998-2002 to facilitate systems change to support the delivery of integrated and trauma-informed services for women with co-occurring substance abuse and mental health disorders and histories of violence and empirical evidence of resulting systems changes. The federally funded Women Embracing Life and Living (WELL) Project utilized relational strategies to facilitate systems change within and across 3 systems levels: local treatment providers, community (or region), and state. The WELL Project demonstrates that a highly collaborative, inclusive, and facilitated change process can effect services integration within agencies (intra-agency), strengthen integration within a regional network of agencies (interagency), and foster state support for services integration.

  2. Integrated track stability assessment and monitoring system (ITSAMS).

    DOT National Transportation Integrated Search

    2006-10-01

    The overall objective of project is to continue the development of remote sensing : technologies that can be integrated and deployed in a mobile inspection vehicle i.e. Integrated : Track Stability Assessment and Monitoring System (ITSAMS).

  3. Energy Systems Integration: Demonstrating the Grid Benefits of Connected Devices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Overview fact sheet about the Electric Power Research Institute (EPRI) and the University of Delaware Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) project at the Energy Systems Integration Facility. INTEGRATE is part of the U.S. Department of Energy's Grid Modernization Initiative.

  4. Identifying inaccuracy of MS Project using system analysis

    NASA Astrophysics Data System (ADS)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  5. The Bilingual Academic Services and Integrated Career Systems Program: Project BASICS, 1987-1988. OREA Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Carey, Cecilia

    The Bilingual Academic Services and Integrated Career Systems Program (Project BASICS) is a federally-funded program of instructional and support services provided to 122 students at a Queens high school. The program's aim was to develop English literacy skills and appreciation of cultural diversity, and to prepare students for the psychosocial…

  6. Integration of structural health monitoring and asset management.

    DOT National Transportation Integrated Search

    2012-08-01

    This project investigated the feasibility and potential benefits of the integration of infrastructure monitoring systems into enterprise-scale transportation management systems. An infrastructure monitoring system designed for bridges was implemented...

  7. Successful integration efforts in water quality from the integrated Ocean Observing System Regional Associations and the National Water Quality Monitoring Network

    USGS Publications Warehouse

    Ragsdale, R.; Vowinkel, E.; Porter, D.; Hamilton, P.; Morrison, R.; Kohut, J.; Connell, B.; Kelsey, H.; Trowbridge, P.

    2011-01-01

    The Integrated Ocean Observing System (IOOS??) Regional Associations and Interagency Partners hosted a water quality workshop in January 2010 to discuss issues of nutrient enrichment and dissolved oxygen depletion (hypoxia), harmful algal blooms (HABs), and beach water quality. In 2007, the National Water Quality Monitoring Council piloted demonstration projects as part of the National Water Quality Monitoring Network (Network) for U.S. Coastal Waters and their Tributaries in three IOOS Regional Associations, and these projects are ongoing. Examples of integrated science-based solutions to water quality issues of major concern from the IOOS regions and Network demonstration projects are explored in this article. These examples illustrate instances where management decisions have benefited from decision-support tools that make use of interoperable data. Gaps, challenges, and outcomes are identified, and a proposal is made for future work toward a multiregional water quality project for beach water quality.

  8. User-Oriented Project Accounting System.

    ERIC Educational Resources Information Center

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  9. How to Improve Integrated Care for People with Chronic Conditions: Key Findings from EU FP-7 Project INTEGRATE and Beyond.

    PubMed

    Borgermans, Liesbeth; Marchal, Yannick; Busetto, Loraine; Kalseth, Jorid; Kasteng, Frida; Suija, Kadri; Oona, Marje; Tigova, Olena; Rösenmuller, Magda; Devroey, Dirk

    2017-09-25

    Political and public health leaders increasingly recognize the need to take urgent action to address the problem of chronic diseases and multi-morbidity. European countries are facing unprecedented demand to find new ways to deliver care to improve patient-centredness and personalization, and to avoid unnecessary time in hospitals. People-centred and integrated care has become a central part of policy initiatives to improve the access, quality, continuity, effectiveness and sustainability of healthcare systems and are thus preconditions for the economic sustainability of the EU health and social care systems. This study presents an overview of lessons learned and critical success factors to policy making on integrated care based on findings from the EU FP-7 Project Integrate, a literature review, other EU projects with relevance to this study, a number of best practices on integrated care and our own experiences with research and policy making in integrated care at the national and international level. Seven lessons learned and critical success factors to policy making on integrated care were identified. The lessons learned and critical success factors to policy making on integrated care show that a comprehensive systems perspective should guide the development of integrated care towards better health practices, education, research and policy.

  10. How to Improve Integrated Care for People with Chronic Conditions: Key Findings from EU FP-7 Project INTEGRATE and Beyond

    PubMed Central

    Marchal, Yannick; Busetto, Loraine; Kalseth, Jorid; Kasteng, Frida; Suija, Kadri; Oona, Marje; Tigova, Olena; Rösenmuller, Magda; Devroey, Dirk

    2017-01-01

    Background: Political and public health leaders increasingly recognize the need to take urgent action to address the problem of chronic diseases and multi-morbidity. European countries are facing unprecedented demand to find new ways to deliver care to improve patient-centredness and personalization, and to avoid unnecessary time in hospitals. People-centred and integrated care has become a central part of policy initiatives to improve the access, quality, continuity, effectiveness and sustainability of healthcare systems and are thus preconditions for the economic sustainability of the EU health and social care systems. Purpose: This study presents an overview of lessons learned and critical success factors to policy making on integrated care based on findings from the EU FP-7 Project Integrate, a literature review, other EU projects with relevance to this study, a number of best practices on integrated care and our own experiences with research and policy making in integrated care at the national and international level. Results: Seven lessons learned and critical success factors to policy making on integrated care were identified. Conclusion: The lessons learned and critical success factors to policy making on integrated care show that a comprehensive systems perspective should guide the development of integrated care towards better health practices, education, research and policy. PMID:29588630

  11. The integrated project: a promising promotional strategy for primary health care.

    PubMed

    Daniel, C; Mora, B

    1985-10-01

    The integrated project using parasite control and nutrition as entry points for family planning practice has shown considerable success in promoting health consciousness among health workers and project beneficiaries. This progress is evident in the Family Planning, Parasite Control and Nutrition (FAPPCAN) areas. The project has also mobilized technical and financial support from the local government as well as from private and civic organizations. The need for integration is underscored by the following considerations: parasite control has proved to be effective for preventive health care; the integrated project uses indigenous community health workers to accomplish its objectives; the primary health care (PHC) movement depends primarily on voluntary community participation and the integrated project has shown that it can elicit this participation. The major health problems in the Philippines are: a prevalence of communicable and other infectious diseases; poor evironmental sanitation; malnutrition; and a rapid population growth rate. The integrated program utilizes the existing village health workers in identifying problems related to family planning, parasite control and nutrition and integrates these activities into the health delivery system; educates family members on how to detect health and health-related problems; works out linkages with government agencies and the local primary health care committee in defining the scope of health-related problems; mobilizes community members to initiate their own projects; gets the commitment of village officials and committe members. The integrated project operates within the PHC. A health van with a built-in video playback system provides educational and logistical support to the village worker. The primary detection and treatment of health problems are part of the village health workers' responsibilities. Research determines the project's capability to reactivate the village primary health care committees and sustain community commitment. The project initially covered 4 villages. Implementation problems included: inactive village health workers, inadequate supervision and monitoring of PHC, a lack of commitment of committee members, and the lack of financial support.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shahidehpour, Mohammad

    Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practicesmore » can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.« less

  13. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Hackenberg, Davis L.

    2016-01-01

    UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

  14. Multilevel Evaluation Systems Project. Final Report.

    ERIC Educational Resources Information Center

    Herman, Joan L.

    Several studies were conducted in 1987 by the Multilevel Evaluation Systems Project, which focuses on developing a model for a multi-purpose, multi-user evaluation system to facilitate educational decision making and evaluation. The project model emphasizes on-going integrated assessment of individuals, classes, and programs using a variety of…

  15. Git Replacement for the

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, P.

    2014-09-23

    GRAPE is a tool for managing software project workflows for the Git version control system. It provides a suite of tools to simplify and configure branch based development, integration with a project's testing suite, and integration with the Atlassian Stash repository hosting tool.

  16. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  17. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project

    NASA Technical Reports Server (NTRS)

    Griner, James H.

    2013-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication system prototype radio, operating on recently allocated UAS frequency spectrum bands. The prototype radio will be used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the design, development, and flight test planning for this prototype radio.

  18. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Gen-4 and Gen-5 Radio Plans

    NASA Technical Reports Server (NTRS)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current plans for the prototype radio development.

  19. Construction Management Activities of Governmental Agencies in the New England Area During the Construction Phase.

    DTIC Science & Technology

    1980-02-01

    automatic data exchange ... 56 There are currently 12 Data Systems available: I. Integrated Disbursing and Accounting (IDA) 2. Integrated Program Management...construction project progress through the use of a CPM scheduling and progress reporting system . It automatically generates invoices for payment and payment...posted on the project. Water will be drained daily from tanks of vehicle air brake systems . Rtigging, hooks, pendants and slings will be examined

  20. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  1. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project

    NASA Technical Reports Server (NTRS)

    Fern, Lisa

    2017-01-01

    This presentation summarizes the simulation work conducted by the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project. It focuses on the contribution of that research to the development of RTCA Special Committee 228's (SC-228) Minimum Operational Performance Standards (MOPS) for UAS. The research objectives and primary findings from four different human-in-the-loop simulations are discussed, along with the specific requirements these studies led to in the final MOPS document.

  2. RHODES-ITMS-MILOS : ramp metering system test

    DOT National Transportation Integrated Search

    2002-04-01

    The RHODES-Integrated Traffic Management System Program addresses the design and development of a real-time traffic adaptive control system for an integrated system of freeways and arterial roads. The goals of this project were to test coordinated, a...

  3. Flight Testing an Integrated Synthetic Vision System

    NASA Technical Reports Server (NTRS)

    Kramer, Lynda J.; Arthur, Jarvis J., III; Bailey, Randall E.; Prinzel, Lawrence J., III

    2005-01-01

    NASA's Synthetic Vision Systems (SVS) project is developing technologies with practical applications to eliminate low visibility conditions as a causal factor to civil aircraft accidents while replicating the operational benefits of clear day flight operations, regardless of the actual outside visibility condition. A major thrust of the SVS project involves the development/demonstration of affordable, certifiable display configurations that provide intuitive out-the-window terrain and obstacle information with advanced pathway guidance for transport aircraft. The SVS concept being developed at NASA encompasses the integration of tactical and strategic Synthetic Vision Display Concepts (SVDC) with Runway Incursion Prevention System (RIPS) alerting and display concepts, real-time terrain database integrity monitoring equipment (DIME), and Enhanced Vision Systems (EVS) and/or improved Weather Radar for real-time object detection and database integrity monitoring. A flight test evaluation was jointly conducted (in July and August 2004) by NASA Langley Research Center and an industry partner team under NASA's Aviation Safety and Security, Synthetic Vision System project. A Gulfstream GV aircraft was flown over a 3-week period in the Reno/Tahoe International Airport (NV) local area and an additional 3-week period in the Wallops Flight Facility (VA) local area to evaluate integrated Synthetic Vision System concepts. The enabling technologies (RIPS, EVS and DIME) were integrated into the larger SVS concept design. This paper presents experimental methods and the high level results of this flight test.

  4. TSHIPS : Transportation shipping harmonization and integration planning system

    DOT National Transportation Integrated Search

    2001-03-01

    This report documents the development of the Transportation Shipping Harmonization and Integration Planning System (TSHIPS). The TSHIPS project was developed to advance the state of the art in transportation systems analysis. Existing approaches and ...

  5. A study on integrating surveys of terrestrial natural resources: The Oregon Demonstration Project

    Treesearch

    J. Jeffery Goebel; Hans T. Schreuder; Carol C. House; Paul H. Geissler; Anthony R. Olsen; William Williams

    1998-01-01

    An interagency project demonstrated the feasibility of integrating Federal surveys of terrestrial natural resources and offers a vision for that integration. At locations selected from forest inventory and analysis, National forest system Region 6, and national resources inventory surveys in a six-county area in Northern Oregon, experienced teams interpreted and made...

  6. System requirement specification for the IH-10 Integrated Corridor Management System (ICMS) in San Antonio, Texas

    DOT National Transportation Integrated Search

    2008-03-31

    This Requirements Specification Document (RSD) was developed under the project titled TransGuide Integrated Corridor Management Stage 1 as part of the United States Department of Transportation (USDOT) Integrated Corridor Management (ICM) p...

  7. Evaluation Framework and Analyses for Thermal Energy Storage Integrated with Packaged Air Conditioning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kung, F.; Deru, M.; Bonnema, E.

    2013-10-01

    Few third-party guidance documents or tools are available for evaluating thermal energy storage (TES) integrated with packaged air conditioning (AC), as this type of TES is relatively new compared to TES integrated with chillers or hot water systems. To address this gap, researchers at the National Renewable Energy Laboratory conducted a project to improve the ability of potential technology adopters to evaluate TES technologies. Major project outcomes included: development of an evaluation framework to describe key metrics, methodologies, and issues to consider when assessing the performance of TES systems integrated with packaged AC; application of multiple concepts from the evaluationmore » framework to analyze performance data from four demonstration sites; and production of a new simulation capability that enables modeling of TES integrated with packaged AC in EnergyPlus. This report includes the evaluation framework and analysis results from the project.« less

  8. Systems Integration Processes for NASA Ares I Crew Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Taylor, James L.; Reuter, James L.; Sexton, Jeffrey D.

    2006-01-01

    NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

  9. SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.

    ERIC Educational Resources Information Center

    BOICE, JOHN,; AND OTHERS

    ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…

  10. ESIF 2016: Modernizing Our Grid and Energy System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Becelaere, Kimberly

    This 2016 annual report highlights work conducted at the Energy Systems Integration Facility (ESIF) in FY 2016, including grid modernization, high-performance computing and visualization, and INTEGRATE projects.

  11. Quantifying the importance of model-to-model variability in integrated assessments of 21st century climate

    NASA Astrophysics Data System (ADS)

    Bond-Lamberty, B. P.; Jones, A. D.; Shi, X.; Calvin, K. V.

    2016-12-01

    The C4MIP and CMIP5 model intercomparison projects (MIPs) highlighted uncertainties in climate projections, driven to a large extent by interactions between the terrestrial carbon cycle and climate feedbacks. In addition, the importance of feedbacks between human (energy and economic) systems and natural (carbon and climate) systems is poorly understood, and not considered in the previous MIP protocols. The experiments conducted under the previous Integrated Earth System Model (iESM) project, which coupled a earth system model with an integrated assessment model (GCAM), found that the inclusion of climate feedbacks on the terrestrial system in an RCP4.5 scenario increased ecosystem productivity, resulting in declines in cropland extent and increases in bioenergy production and forest cover. As a follow-up to these studies and to further understand climate-carbon cycle interactions and feedbacks, we examined the robustness of these results by running a suite of GCAM-only experiments using changes in ecosystem productivity derived from both the CMIP5 archive and the Agricultural Model Intercomparison Project. In our results, the effects of climate on yield in an RCP8.5 scenario tended to be more positive than those of AgMIP, but more negative than those of the other CMIP models. We discuss these results and the implications of model-to-model variability for integrated coupling studies of the future earth system.

  12. Multiple-source spatial data fusion and integration research in the region unified planning management information system

    NASA Astrophysics Data System (ADS)

    Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun

    2008-12-01

    In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.

  13. US-75 ICM system design document : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2013-06-01

    This System Design document for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US Department of Transportation Integrated Corridor Management Initiative. The basic premise behind the ICM initiative is that in...

  14. Integrated Test and Evaluation Flight Test 3 Flight Test Plan

    NASA Technical Reports Server (NTRS)

    Marston, Michael Lawrence

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

  15. A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

    NASA Technical Reports Server (NTRS)

    Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher

    2010-01-01

    The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

  16. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase one, volume 4 : use of knowledge integrated visual analytics system in supporting bridge management.

    DOT National Transportation Integrated Search

    2009-12-01

    The goals of integration should be: Supporting domain oriented data analysis through the use of : knowledge augmented visual analytics system. In this project, we focus on: : Providing interactive data exploration for bridge managements. : ...

  17. The telerobot workstation testbed for the shuttle aft flight deck: A project plan for integrating human factors into system design

    NASA Technical Reports Server (NTRS)

    Sauerwein, Timothy

    1989-01-01

    The human factors design process in developing a shuttle orbiter aft flight deck workstation testbed is described. In developing an operator workstation to control various laboratory telerobots, strong elements of human factors engineering and ergonomics are integrated into the design process. The integration of human factors is performed by incorporating user feedback at key stages in the project life-cycle. An operator centered design approach helps insure the system users are working with the system designer in the design and operation of the system. The design methodology is presented along with the results of the design and the solutions regarding human factors design principles.

  18. Additive Manufacturing Integrated Energy Demonstration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jackson, Roderick; Lee, Brian; Love, Lonnie

    2016-02-05

    Meet AMIE - the Additive Manufacturing Integrated Energy demonstration project. Led by Oak Ridge National Laboratory and many industry partners, the AMIE project changes the way we think about generating, storing, and using electrical power. AMIE uses an integrated energy system that shares energy between a building and a vehicle. And, utilizing advanced manufacturing and rapid innovation, it only took one year from concept to launch.

  19. Additive Manufacturing Integrated Energy Demonstration

    ScienceCinema

    Jackson, Roderick; Lee, Brian; Love, Lonnie; Mabe, Gavin; Keller, Martin; Curran, Scott; Chinthavali, Madhu; Green, Johney; Sawyer, Karma; Enquist, Phil

    2018-01-16

    Meet AMIE - the Additive Manufacturing Integrated Energy demonstration project. Led by Oak Ridge National Laboratory and many industry partners, the AMIE project changes the way we think about generating, storing, and using electrical power. AMIE uses an integrated energy system that shares energy between a building and a vehicle. And, utilizing advanced manufacturing and rapid innovation, it only took one year from concept to launch.

  20. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project. ACT/Control/Guidance System study, volume 1

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The active control technology (ACT) control/guidance system task of the integrated application of active controls (IAAC) technology project within the NASA energy efficient transport program was documented. The air traffic environment of navigation and air traffic control systems and procedures were extrapolated. An approach to listing flight functions which will be performed by systems and crew of an ACT configured airplane of the 1990s, and a determination of function criticalities to safety of flight, are the basis of candidate integrated ACT/Control/Guidance System architecture. The system mechanizes five active control functions: pitch augmented stability, angle of attack limiting, lateral/directional augmented stability, gust load alleviation, and maneuver load control. The scope and requirements of a program for simulating the integrated ACT avionics and flight deck system, with pilot in the loop, are defined, system and crew interface elements are simulated, and mechanization is recommended. Relationships between system design and crew roles and procedures are evaluated.

  1. Environmental testing philosophy for a Sandia National Laboratories small satellite project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cap, J.S.; Rackley, N.G.

    1996-03-01

    Sandia National Laboratories is the system integrator on a small satellite project. Following the intent of the NASA GEVS document, an integrated test philosophy was formulated to certify the satellite for flight. The purpose of this paper is to present that philosophy.

  2. I-15 integrated corridor management : system requirements.

    DOT National Transportation Integrated Search

    2011-07-01

    This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ho...

  3. Power Take-off System for Marine Renewable Devices, CRADA Number CRD-14-566

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muljadi, Eduard

    Ocean Renewable Power Company (ORPC) proposes a project to develop and test innovative second-generation power take-off (PTO) components for the U.S. Department of Energy's 2013 FOA: Marine and Hydrokinetic System Performance Advancement, Topic Area 2 (Project). Innovative PTO components will include new and improved designs for bearings, couplings and a subsea electrical generator. Specific project objectives include the following: (1) Develop components for an advanced PTO suitable for MHK devices; (2) Bench test these components; (3) Assess the component and system performance benefits; (4) Perform a system integration study to integrate these components into an ORPC hydrokinetic turbine. National Renewablemore » Energy Laboratory (NREL) will participate on the ORPC lead team to review design of the generator and will provide guidance on the design. Based on inputs from the project team, NREL will also provide an economic analysis of the impacts of the proposed system performance advancements.« less

  4. Use of the MATRIXx Integrated Toolkit on the Microwave Anisotropy Probe Attitude Control System

    NASA Technical Reports Server (NTRS)

    Ward, David K.; Andrews, Stephen F.; McComas, David C.; ODonnell, James R., Jr.

    1999-01-01

    Recent advances in analytical software tools allow the analysis, simulation, flight code, and documentation of an algorithm to be generated from a single source, all within one integrated analytical design package. NASA's Microwave Anisotropy Probe project has used one such package, Integrated Systems' MATRIXx suite, in the design of the spacecraft's Attitude Control System. The project's experience with the linear analysis, simulation, code generation, and documentation tools will be presented and compared with more traditional development tools. In particular, the quality of the flight software generated will be examined in detail. Finally, lessons learned on each of the tools will be shared.

  5. Integration of design and inspection

    NASA Astrophysics Data System (ADS)

    Simmonds, William H.

    1990-08-01

    Developments in advanced computer integrated manufacturing technology, coupled with the emphasis on Total Quality Management, are exposing needs for new techniques to integrate all functions from design through to support of the delivered product. One critical functional area that must be integrated into design is that embracing the measurement, inspection and test activities necessary for validation of the delivered product. This area is being tackled by a collaborative project supported by the UK Government Department of Trade and Industry. The project is aimed at developing techniques for analysing validation needs and for planning validation methods. Within the project an experimental Computer Aided Validation Expert system (CAVE) is being constructed. This operates with a generalised model of the validation process and helps with all design stages: specification of product requirements; analysis of the assurance provided by a proposed design and method of manufacture; development of the inspection and test strategy; and analysis of feedback data. The kernel of the system is a knowledge base containing knowledge of the manufacturing process capabilities and of the available inspection and test facilities. The CAVE system is being integrated into a real life advanced computer integrated manufacturing facility for demonstration and evaluation.

  6. VHBuild.com: A Web-Based System for Managing Knowledge in Projects.

    ERIC Educational Resources Information Center

    Li, Heng; Tang, Sandy; Man, K. F.; Love, Peter E. D.

    2002-01-01

    Describes an intelligent Web-based construction project management system called VHBuild.com which integrates project management, knowledge management, and artificial intelligence technologies. Highlights include an information flow model; time-cost optimization based on genetic algorithms; rule-based drawing interpretation; and a case-based…

  7. Production roll out plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects,more » General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.« less

  8. Canada's Intelligent Transportation Systems (ITS) : deployment and integration plan : applicant's guide

    DOT National Transportation Integrated Search

    2000-02-01

    This document is the applicant's guide for proposing intelligent transportation systems projects to Transport Canada and details such matters as eligibility, Transport Canada's program objectives and assessment of projects

  9. Integration of midwives into the Quebec health care system. L'Equipe d'Evaluation des Projets-Pilotes Sages-Femmes.

    PubMed

    Collin, J; Blais, R; White, D; Demers, A; Desbiens, F

    2000-01-01

    This paper reports on one aspect of the evaluation of the midwifery pilot projects in Quebec: the identification of the professional and organizational factors, as well as the mode of integrating midwives into the maternity care system, that would promote the best outcomes and the autonomy of midwives. The research strategy involved a multiple-case study, in which each midwifery pilot project represented a case. Based on a qualitative approach, the study employed various sources of data: individual interviews and focus groups with key informants, site observations and analyses of written documents. Results show that midwives were poorly integrated into the health care system during the evaluation. Four main reasons were identified: lack of knowledge about the practice of midwifery on the part of other health care providers; deficiencies in the legal and organizational structure of the pilot projects; competition over professional territories; and gaps between the midwives' and other providers' professional cultures. Recommendations are provided to facilitate the integration of midwives into the health care system.

  10. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    NASA Astrophysics Data System (ADS)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  11. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Detect and Avoid Display Evaluations in Support of SC-228 Minimum Operational Performance Standards Development

    NASA Technical Reports Server (NTRS)

    Fern, Lisa Carolynn

    2017-01-01

    The primary activity for the UAS-NAS Human Systems Integration (HSI) sub-project in Phase 1 was support of RTCA Special Committee 228 Minimum Operational Performance Standards (MOPS). We provide data on the effect of various Detect and Avoid (DAA) display features with respect to pilot performance of the remain well clear function in order to determine the minimum requirements for DAA displays.

  12. Demonstration of Next-Generation PEM CHP Systems for Global Markets Using PBI Membrane Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vogel, John; Fritz Intwala, Katrina

    Plug Power and BASF have conducted eight years of development work prior to this project, demonstrating the potential of PBI membranes to exceed many DOE technical targets. This project consisted of; 1.The development of a worldwide system architecture; 2.Stack and balance of plant module development; 3.Development of an improved, lower cost MEA electrode; 4.Receipt of an improved MEA from the EU consortium; 5.Integration of modules into a system; and 6.Delivery of system to EU consortium for additional integration of technologies and testing.

  13. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project, UAS Control and Non-Payload Communication System Phase-1 Flight Test Results

    NASA Technical Reports Server (NTRS)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the prototype radio development, and results from phase 1 flight tests conducted during 2013.

  14. ENCOMPASS: A SAGA based environment for the compositon of programs and specifications, appendix A

    NASA Technical Reports Server (NTRS)

    Terwilliger, Robert B.; Campbell, Roy H.

    1985-01-01

    ENCOMPASS is an example integrated software engineering environment being constructed by the SAGA project. ENCOMPASS supports the specification, design, construction and maintenance of efficient, validated, and verified programs in a modular programming language. The life cycle paradigm, schema of software configurations, and hierarchical library structure used by ENCOMPASS is presented. In ENCOMPASS, the software life cycle is viewed as a sequence of developments, each of which reuses components from the previous ones. Each development proceeds through the phases planning, requirements definition, validation, design, implementation, and system integration. The components in a software system are modeled as entities which have relationships between them. An entity may have different versions and different views of the same project are allowed. The simple entities supported by ENCOMPASS may be combined into modules which may be collected into projects. ENCOMPASS supports multiple programmers and projects using a hierarchical library system containing a workspace for each programmer; a project library for each project, and a global library common to all projects.

  15. Exploration Life Support Critical Questions for Future Human Space Missions

    NASA Technical Reports Server (NTRS)

    Kwert, Michael K.; Barta, Daniel J.; McQuillan, Jeff

    2010-01-01

    Exploration Life Support (ELS) is a current project under NASA's Exploration Systems Mission Directorate. The ELS Project plans, coordinates and implements the development of advanced life support technologies for human exploration missions in space. Recent work has focused on closed loop atmosphere and water systems for long duration missions, including habitats and pressurized rovers. But, what are the critical questions facing life support system developers for these and other future human missions? This paper explores those questions and how progress in the development of ELS technologies can help answer them. The ELS Project includes the following Elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems, Habitation Engineering, Systems Integration, Modeling and Analysis, and Validation and Testing, which includes the Sub-Elements Flight Experiments and Integrated Testing. Systems engineering analysis by ELS seeks to optimize overall mission architectures by considering all the internal and external interfaces of the life support system and the potential for reduction or reuse of commodities. In particular, various sources and sinks of water and oxygen are considered along with the implications on loop closure and the resulting launch mass requirements. Systems analysis will be validated through the data gathered from integrated testing, which will demonstrate the interfaces of a closed loop life support system. By applying a systematic process for defining, sorting and answering critical life support questions, the ELS project is preparing for a variety of future human space missions

  16. UAS-NAS Integrated Human in the Loop: Test Environment Report

    NASA Technical Reports Server (NTRS)

    Murphy, Jim; Otto, Neil; Jovic, Srba

    2015-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration in the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability (SSI), Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research was broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of the Test Infrastructure theme was to enable development and validation of airspace integration procedures and performance standards, including the execution of integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project developed an adaptable, scalable, and schedulable relevant test environment incorporating live, virtual, and constructive elements capable of validating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project planned to conduct three integrated events: a Human-in-the-Loop simulation and two Flight Test series that integrated key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events were built on the technical achievements, fidelity and complexity of previous simulations and tests, resulting in research findings that support the development of regulations governing the access of UAS into the NAS. The purpose of this document is to describe how well the system under test was representative

  17. Spacecraft design project: Low Earth orbit communications satellite

    NASA Technical Reports Server (NTRS)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  18. Integrating the transportation system with a university transportation master plan : best practices and lessons learned.

    DOT National Transportation Integrated Search

    2010-05-01

    The University of Texas at El Paso (UTEP) is planning several projects that will have a substantial impact in : the transportation network in El Paso. This research project conducted a study of the integration of the El : Paso metropolitan transporta...

  19. NASA Earned Value Management (EVM) Update

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald

    2013-01-01

    Earned Value Management (EVM) is an integrated management control system for assessing, understanding and qualifying what a project is achieving with the resoures. EVM integrates technical cost and schedules with risk management. It allows objective assessment and quantification of current project performance, and helps predict future performance-based trents.

  20. Piloting Systems Reset Path Integration Systems during Position Estimation

    ERIC Educational Resources Information Center

    Zhang, Lei; Mou, Weimin

    2017-01-01

    During locomotion, individuals can determine their positions with either idiothetic cues from movement (path integration systems) or visual landmarks (piloting systems). This project investigated how these 2 systems interact in determining humans' positions. In 2 experiments, participants studied the locations of 5 target objects and 1 single…

  1. Genomes OnLine Database (GOLD) v.6: data updates and feature enhancements

    PubMed Central

    Mukherjee, Supratim; Stamatis, Dimitri; Bertsch, Jon; Ovchinnikova, Galina; Verezemska, Olena; Isbandi, Michelle; Thomas, Alex D.; Ali, Rida; Sharma, Kaushal; Kyrpides, Nikos C.; Reddy, T. B. K.

    2017-01-01

    The Genomes Online Database (GOLD) (https://gold.jgi.doe.gov) is a manually curated data management system that catalogs sequencing projects with associated metadata from around the world. In the current version of GOLD (v.6), all projects are organized based on a four level classification system in the form of a Study, Organism (for isolates) or Biosample (for environmental samples), Sequencing Project and Analysis Project. Currently, GOLD provides information for 26 117 Studies, 239 100 Organisms, 15 887 Biosamples, 97 212 Sequencing Projects and 78 579 Analysis Projects. These are integrated with over 312 metadata fields from which 58 are controlled vocabularies with 2067 terms. The web interface facilitates submission of a diverse range of Sequencing Projects (such as isolate genome, single-cell genome, metagenome, metatranscriptome) and complex Analysis Projects (such as genome from metagenome, or combined assembly from multiple Sequencing Projects). GOLD provides a seamless interface with the Integrated Microbial Genomes (IMG) system and supports and promotes the Genomic Standards Consortium (GSC) Minimum Information standards. This paper describes the data updates and additional features added during the last two years. PMID:27794040

  2. Science of Integrated Approaches to Natural Resources Management

    NASA Astrophysics Data System (ADS)

    Tengberg, Anna; Valencia, Sandra

    2017-04-01

    To meet multiple environmental objectives, integrated programming is becoming increasingly important for the Global Environmental Facility (GEF), the financial mechanism of the multilateral environmental agreements, including the United Nations Convention to Combat Desertification (UNCCD). Integration of multiple environmental, social and economic objectives also contributes to the achievement of the Sustainable Development Goals (SDGs) in a timely and cost-effective way. However, integration is often not well defined. This paper therefore focuses on identifying key aspects of integration and assessing their implementation in natural resources management (NRM) projects. To that end, we draw on systems thinking literature, and carry out an analysis of a random sample of GEF integrated projects and in-depth case studies demonstrating lessons learned and good practices in addressing land degradation and other NRM challenges. We identify numerous challenges and opportunities of integrated approaches that need to be addressed in order to maximise the catalytic impact of the GEF during problem diagnosis, project design, implementation and governance. We highlight the need for projects to identify clearer system boundaries and main feedback mechanisms within those boundaries, in order to effectively address drivers of environmental change. We propose a theory of change for Integrated Natural Resources Management (INRM) projects, where short-term environmental and socio-economic benefits will first accrue at the local level. Implementation of improved INRM technologies and practices at the local level can be extended through spatial planning, strengthening of innovation systems, and financing and incentive mechanisms at the watershed and/or landscape/seascape level to sustain and enhance ecosystem services at larger scales and longer time spans. We conclude that the evolving scientific understanding of factors influencing social, technical and institutional innovations and transitions towards sustainable management of natural resources should be harnessed and integrated into GEF's influencing models and theory of change, and be coupled with updated approaches for learning, adaptive management and scaling up.

  3. Development of an Intelligent Monitoring System for Geological Carbon Sequestration (GCS) Systems

    NASA Astrophysics Data System (ADS)

    Sun, A. Y.; Jeong, H.; Xu, W.; Hovorka, S. D.; Zhu, T.; Templeton, T.; Arctur, D. K.

    2016-12-01

    To provide stakeholders timely evidence that GCS repositories are operating safely and efficiently requires integrated monitoring to assess the performance of the storage reservoir as the CO2 plume moves within it. As a result, GCS projects can be data intensive, as a result of proliferation of digital instrumentation and smart-sensing technologies. GCS projects are also resource intensive, often requiring multidisciplinary teams performing different monitoring, verification, and accounting (MVA) tasks throughout the lifecycle of a project to ensure secure containment of injected CO2. How to correlate anomaly detected by a certain sensor to events observed by other devices to verify leakage incidents? How to optimally allocate resources for task-oriented monitoring if reservoir integrity is in question? These are issues that warrant further investigation before real integration can take place. In this work, we are building a web-based, data integration, assimilation, and learning framework for geologic carbon sequestration projects (DIAL-GCS). DIAL-GCS will be an intelligent monitoring system (IMS) for automating GCS closed-loop management by leveraging recent developments in high-throughput database, complex event processing, data assimilation, and machine learning technologies. Results will be demonstrated using realistic data and model derived from a GCS site.

  4. NDS modernization project - requirements analysis report

    DOT National Transportation Integrated Search

    1997-04-09

    The National Distress System (NDS) Modernization Project envisions replacing/modernizing the present VHF-FM based system with an integrated state-of-the-art commercial/government-off- : the-shelf (COTS/GOTS) or non-developmental item (NDI) solution. ...

  5. System integration test plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  6. Towards a Participatory Strategy for Integrated Rural Development.

    ERIC Educational Resources Information Center

    Lowdermilk, Max; Laitos, W. Robert

    1981-01-01

    Details essential elements of any rural development program, describes a seven-stage project development strategy which has proved successful in water management projects in Pakistan and Egypt, delineates the key concepts in each of the seven stages, and recommends integration of the client system into rural development programs. (Author)

  7. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Terminal Operations HITL 1B Primary Results

    NASA Technical Reports Server (NTRS)

    Rorie, Conrad; Monk, Kevin; Roberts, Zach; Brandt, Summer

    2018-01-01

    This presentation provides an overview of the primary results from the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project's second Terminal Operations human-in-the-loop simulation. This talk covers the background of this follow-on experiment, which includes an overview of the first Terminal Operations HITL performed by the project. The primary results include a look at the number and durations of detect and avoid (DAA) alerts issued by the two DAA systems under test. It also includes response time metrics and metrics on the ability of the pilot-in-command (PIC) to maintain sufficient separation. Additional interoperability metrics are included to illustrate how pilots interact with the tower controller. Implications and conclusions are covered at the end.

  8. Crescent Evaluation : appendix D : crescent computer system components evaluation report

    DOT National Transportation Integrated Search

    1994-02-01

    In 1990, Lockheed Integrated Systems Company (LISC) was awarded a contract, under the Crescent Demonstration Project, to demonstrate the integration of Weigh In Motion (WIM), Automatic Vehicle Classification (AVC) and Automatic Vehicle Identification...

  9. Case Mix Management Systems: An Opportunity to Integrate Medical Records and Financial Management System Data Bases

    PubMed Central

    Rusnak, James E.

    1987-01-01

    Due to previous systems selections, many hospitals (health care facilities) are faced with the problem of fragmented data bases containing clinical, demographic and financial information. Projects to select and implement a Case Mix Management System (CMMS) provide an opportunity to reduce the number of separate physical files and to migrate towards systems with an integrated data base. The number of CMMS candidate systems is often restricted due to data base and system interface issues. The hospital must insure the CMMS project provides a means to implement an integrated on-line hospital information data base for use by departments in operating under a DRG-based Prospective Payment System. This paper presents guidelines for use in selecting a Case Mix Mangement System to meet the hospital's financial and operations planning, budgeting, marketing, and other management needs, while considering the data base implications of the implementation.

  10. New York integrated incident management system evaluation project final report

    DOT National Transportation Integrated Search

    2007-03-23

    The Integrated Incident Management System (IIMS) enables incident response personnel to transmit data about an incident to other responders and dispatchers on a real-time basis. When an incident is entered into IIMS, the system uses GPS to identify t...

  11. Instrumentation and monitoring of rustic road geosynthetic reinforced soil (GRS) integrated bridge system (IBS).

    DOT National Transportation Integrated Search

    2016-11-01

    J. Erik Loehr ; orcid.org/0000-0001-6035-8416 : An instrumentation and monitoring system was implemented for a geosynthetic reinforced soil (GRS) integrated bridge : system (IBS) constructed in Boone County, Missouri in 2014. The project location is ...

  12. UAS Integration in the NAS Project: Flight Test 3 Data Analysis of JADEM-Autoresolver Detect and Avoid System

    NASA Technical Reports Server (NTRS)

    Gong, Chester; Wu, Minghong G.; Santiago, Confesor

    2016-01-01

    The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS Integration in the NAS, aims to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The UAS Integration in the NAS Project conducted a flight test activity, referred to as Flight Test 3 (FT3), involving several Detect-and-Avoid (DAA) research prototype systems between June 15, 2015 and August 12, 2015 at the Armstrong Flight Research Center (AFRC). This report documents the flight testing and analysis results for the NASA Ames-developed JADEM-Autoresolver DAA system, referred to as 'Autoresolver' herein. Four flight test days (June 17, 18, 22, and July 22) were dedicated to Autoresolver testing. The objectives of this test were as follows: 1. Validate CPA prediction accuracy and detect-and-avoid (DAA, formerly known as self-separation) alerting logic in realistic flight conditions. 2. Validate DAA trajectory model including maneuvers. 3. Evaluate TCAS/DAA interoperability. 4. Inform final Minimum Operating Performance Standards (MOPS). Flight test scenarios were designed to collect data to directly address the objectives 1-3. Objective 4, inform final MOPS, was a general objective applicable to the UAS in the NAS project as a whole, of which flight test is a subset. This report presents analysis results completed in support of the UAS in the NAS project FT3 data review conducted on October 20, 2015. Due to time constraints and, to a lesser extent, TCAS data collection issues, objective 3 was not evaluated in this analysis.

  13. An overview of integrated flight-propulsion controls flight research on the NASA F-15 research airplane

    NASA Technical Reports Server (NTRS)

    Burcham, Frank W., Jr.; Gatlin, Donald H.; Stewart, James F.

    1995-01-01

    The NASA Dryden Flight Research Center has been conducting integrated flight-propulsion control flight research using the NASA F-15 airplane for the past 12 years. The research began with the digital electronic engine control (DEEC) project, followed by the F100 Engine Model Derivative (EMD). HIDEC (Highly Integrated Digital Electronic Control) became the umbrella name for a series of experiments including: the Advanced Digital Engine Controls System (ADECS), a twin jet acoustics flight experiment, self-repairing flight control system (SRFCS), performance-seeking control (PSC), and propulsion controlled aircraft (PCA). The upcoming F-15 project is ACTIVE (Advanced Control Technology for Integrated Vehicles). This paper provides a brief summary of these activities and provides background for the PCA and PSC papers, and includes a bibliography of all papers and reports from the NASA F-15 project.

  14. Putting the Power of Configuration in the Hands of the Users

    NASA Technical Reports Server (NTRS)

    Al-Shihabi, Mary-Jo; Brown, Mark; Rigolini, Marianne

    2011-01-01

    Goal was to reduce the overall cost of human space flight while maintaining the most demanding standards for safety and mission success. In support of this goal, a project team was chartered to replace 18 legacy Space Shuttle nonconformance processes and systems with one fully integrated system Problem Reporting and Corrective Action (PRACA) processes provide a closed-loop system for the identification, disposition, resolution, closure, and reporting of all Space Shuttle hardware/software problems PRACA processes are integrated throughout the Space Shuttle organizational processes and are critical to assuring a safe and successful program Primary Project Objectives Develop a fully integrated system that provides an automated workflow with electronic signatures Support multiple NASA programs and contracts with a single "system" architecture Define standard processes, implement best practices, and minimize process variations

  15. A Web-Based Monitoring System for Multidisciplinary Design Projects

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  16. ARCS A wide-Anglular Range Chopper Spectrometer at the SNS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prof. Brent Fultz; Dr. Doug Abernathy

    The ARCS spectrometer project has been funded for 39 months. Procurements are now amain activity, although engineering effort remains, and installation has begun. Most of the subsystems are under control, and represent no risk to the project. These are: cryo-goniometer, detectors and electronics, Fermi chopper system, computing cluster, basic reduction software, T0 chopper and main neutron guide. The sample hutch and radiationshielding are still items of some risk. At the time of this writing, we are awaiting vendor proposals for the scattering chamber with integrated sample isolation system. This is thelargest uncertainty in the ARCS project today. The ARCS Chiefmore » Engineer, Kevin Shaw, joined the project in 2004. Project controlsservices are now performed by the SNS. A construction progress review was held in the August, 2004, before which the project was rebaselined, and after which the ProjectExecution Plan was updated. The ARCS project will be rebaselined in March 2005 after a vendor is selected for the scattering chamber with integrated isolation system. Projectcompletion by Sept. 2006 is possible but challenging.« less

  17. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY16 Annual Review

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Hackenberg, Davis

    2016-01-01

    This presentation gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS FY16 progress and future directions.

  18. Nanophotonic projection system.

    PubMed

    Aflatouni, Firooz; Abiri, Behrooz; Rekhi, Angad; Hajimiri, Ali

    2015-08-10

    Low-power integrated projection technology can play a key role in development of low-cost mobile devices with built-in high-resolution projectors. Low-cost 3D imaging and holography systems are also among applications of such a technology. In this paper, an integrated projection system based on a two-dimensional optical phased array with fast beam steering capability is reported. Forward biased p-i-n phase modulators with 200MHz bandwidth are used per each array element for rapid phase control. An optimization algorithm is implemented to compensate for the phase dependent attenuation of the p-i-n modulators. Using rapid vector scanning technique, images were formed and recorded within a single snapshot of the IR camera.

  19. The integrated project AquaTerra of the EU sixth framework lays foundations for better understanding of river-sediment-soil-groundwater systems.

    PubMed

    Gerzabek, M H; Barceló, D; Bellin, A; Rijnaarts, H H M; Slob, A; Darmendrail, D; Fowler, H J; Négrel, Ph; Frank, E; Grathwohl, P; Kuntz, D; Barth, J A C

    2007-07-01

    The integrated project "AquaTerra" with the full title "integrated modeling of the river-sediment-soil-groundwater system; advanced tools for the management of catchment areas and river basins in the context of global change" is among the first environmental projects within the sixth Framework Program of the European Union. Commencing in June 2004, it brought together a multidisciplinary team of 45 partner organizations from 12 EU countries, Romania, Switzerland, Serbia and Montenegro. AquaTerra is an ambitious project with the primary objective of laying the foundations for a better understanding of the behavior of environmental pollutants and their fluxes in the soil-sediment-water system with respect to climate and land use changes. The project performs research as well as modeling on river-sediment-soil-groundwater systems through quantification of deposition, sorption and turnover rates and the development of numerical models to reveal fluxes and trends in soil and sediment functioning. Scales ranging from the laboratory to river basins are addressed with the potential to provide improved river basin management, enhanced soil and groundwater monitoring as well as the early identification and forecasting of impacts on water quantity and quality. Study areas are the catchments of the Ebro, Meuse, Elbe and Danube Rivers and the Brévilles Spring. Here we outline the general structure of the project and the activities conducted within eleven existing sub-projects of AquaTerra.

  20. A CMMI-based approach for medical software project life cycle study.

    PubMed

    Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi

    2013-01-01

    In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.

  1. UAS-NAS Flight Test Series 3: Test Environment Report

    NASA Technical Reports Server (NTRS)

    Hoang, Ty; Murphy, Jim; Otto, Neil

    2016-01-01

    The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration in the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability (SSI), Human Systems Integration (HSI), and Communications (Comm), and Certification to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Detect and Avoid (DAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project is conducting a series of human-in-the-loop (HITL) and flight test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity, and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS. The integrated events started with two initial flight test used to develop and test early integrations and components of the test environment. Test subjects and a relevant test environment were brought in for the integrated HITL (or IHITL) conducted in 2014. The IHITL collected data to evaluate the effectiveness of DAA Well Clear (DWC) algorithms and the acceptability of UAS concepts integrated into the NAS. The first integrated flight test (and the subject of this report) followed the IHITL by replacing the simulation components with live aircraft. The project finishes the integrated events with a final flight test to be conducted in 2016 that provides the researchers with an opportunity to collect DWC and Collision Avoidance (CA) interoperability data during flight encounters.

  2. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    capabilities, and new methodologies that allowed NREL to model operations of the Eastern Interconnection at Analyst Power Systems Modeling Researcher Project Manager Power Systems Engineering Center Research Engineer Power Systems Modeling and Control Get the full list of job postings and learn more about working

  3. Gulf of Mexico Integrated Science - Tampa Bay Study - Data Information Management System (DIMS)

    USGS Publications Warehouse

    Johnston, James

    2004-01-01

    The Tampa Bay Integrated Science Study is an effort by the U.S. Geological Survey (USGS) that combines the expertise of federal, state and local partners to address some of the most pressing ecological problems of the Tampa Bay estuary. This project serves as a template for the application of integrated research projects in other estuaries in the Gulf of Mexico. Efficient information and data distribution for the Tampa Bay Study has required the development of a Data Information Management System (DIMS). This information system is being used as an outreach management tool, providing information to scientists, decision makers and the public on the coastal resources of the Gulf of Mexico.

  4. Developing a drought early warning information system for coastal ecosystems in the Carolinas

    Treesearch

    Kirsten Lackstrom; Amanda Brennan; Paul Conrads; Lisa Darby; Kirstin Dow; Daniel Tuford

    2016-01-01

    The National Integrated Drought Information System (NIDIS) and the Carolinas Integrated Sciences and Assessments (CISA), a National Oceanic and Atmospheric Administration (NOAA)- funded Regional Integrated Sciences and Assessments (RISA) program, are partnering to develop and support a Carolinas Drought Early Warning System pilot program. Research and projects focus on...

  5. Advanced Ground Systems Maintenance Cryogenics Test Lab Control System Upgrade Project

    NASA Technical Reports Server (NTRS)

    Harp, Janice Leshay

    2014-01-01

    This project will outfit the Simulated Propellant Loading System (SPLS) at KSC's Cryogenics Test Laboratory with a new programmable logic control system. The control system upgrade enables the Advanced Ground Systems Maintenace Element Integration Team and other users of the SPLS to conduct testing in a controls environment similar to that used at the launch pad.

  6. Countermeasure Evaluation and Validation Project (CEVP) Database Requirement Documentation

    NASA Technical Reports Server (NTRS)

    Shin, Sung Y.

    2003-01-01

    The initial focus of the project by the JSC laboratories will be to develop, test and implement a standardized complement of integrated physiological test (Integrated Testing Regimen, ITR) that will examine both system and intersystem function, and will be used to validate and certify candidate countermeasures. The ITR will consist of medical requirements (MRs) and non-MR core ITR tests, and countermeasure-specific testing. Non-MR and countermeasure-specific test data will be archived in a database specific to the CEVP. Development of a CEVP Database will be critical to documenting the progress of candidate countermeasures. The goal of this work is a fully functional software system that will integrate computer-based data collection and storage with secure, efficient, and practical distribution of that data over the Internet. This system will provide the foundation of a new level of interagency and international cooperation for scientific experimentation and research, providing intramural, international, and extramural collaboration through management and distribution of the CEVP data. The research performed this summer includes the first phase of the project. The first phase of the project is a requirements analysis. This analysis will identify the expected behavior of the system under normal conditions and abnormal conditions; that could affect the system's ability to produce this behavior; and the internal features in the system needed to reduce the risk of unexpected or unwanted behaviors. The second phase of this project have also performed in this summer. The second phase of project is the design of data entry screen and data retrieval screen for a working model of the Ground Data Database. The final report provided the requirements for the CEVP system in a variety of ways, so that both the development team and JSC technical management have a thorough understanding of how the system is expected to behave.

  7. HORIZONTAL HYBRID SOLAR LIGHT PIPE: AN INTEGRATED SYSTEM OF DAYLIGHT AND ELECTRIC LIGHT

    EPA Science Inventory

    This project will test the feasibility of an advanced energy efficient perimeter lighting system that integrates daylighting, electric lighting, and lighting controls to reduce electricity consumption. The system is designed to provide adequate illuminance levels in deep-floor...

  8. Greater Yellowstone regional traveler and weather information system evaluation plan

    DOT National Transportation Integrated Search

    2002-04-19

    The ITS Integration Program is being conducted to accelerate the integration and interoperability of intelligent transportation systems in metropolitan and rural areas. Projects approved for funding have been assessed as supporting the improvements o...

  9. [Comprehensive system integration and networking in operating rooms].

    PubMed

    Feußner, H; Ostler, D; Kohn, N; Vogel, T; Wilhelm, D; Koller, S; Kranzfelder, M

    2016-12-01

    A comprehensive surveillance and control system integrating all devices and functions is a precondition for realization of the operating room of the future. Multiple proprietary integrated operation room systems are currently available with a central user interface; however, they only cover a relatively small part of all functionalities. Internationally, there are at least three different initiatives to promote a comprehensive systems integration and networking in the operating room: the Japanese smart cyber operating theater (SCOT), the American medical device plug-and-play interoperability program (MDPnP) and the German secure and dynamic networking in operating room and hospital (OR.NET) project supported by the Federal Ministry of Education and Research. Within the framework of the internationally advanced OR.NET project, prototype solution approaches were realized, which make short-term and mid-term comprehensive data retrieval systems probable. An active and even autonomous control of the medical devices by the surveillance and control system (closed loop) is expected only in the long run due to strict regulatory barriers.

  10. Experience Of Implementing The Integrated Management System In Manufacturing Companies In Slovakia

    NASA Astrophysics Data System (ADS)

    Lestyánszka Škůrková, Katarína; Kučerová, Marta; Fidlerová, Helena

    2015-06-01

    In corporate practice, the term of Integrated Management System means a system the aim of which is to manage an organization regarding the quality, environment, health and safety at work. In the first phase of the VEGA project No. 1/0448/13 "Transformation of ergonomics program into the company management structure through interaction and utilization QMS, EMS, HSMS", we focused on obtaining information about the way or procedure of implementing the integrated management systems in manufacturing companies in Slovakia. The paper considers characteristics of integrated management system, specifies the possibilities for successive integration of the management systems and also describes the essential aspects of the practical implementation of integrated management systems in companies in Slovakia.

  11. Intelligent multi-sensor integrations

    NASA Technical Reports Server (NTRS)

    Volz, Richard A.; Jain, Ramesh; Weymouth, Terry

    1989-01-01

    Growth in the intelligence of space systems requires the use and integration of data from multiple sensors. Generic tools are being developed for extracting and integrating information obtained from multiple sources. The full spectrum is addressed for issues ranging from data acquisition, to characterization of sensor data, to adaptive systems for utilizing the data. In particular, there are three major aspects to the project, multisensor processing, an adaptive approach to object recognition, and distributed sensor system integration.

  12. Lessons Learned on Implementing Fault Detection, Isolation, and Recovery (FDIR) in a Ground Launch Environment

    NASA Technical Reports Server (NTRS)

    Ferrell, Bob A.; Lewis, Mark E.; Perotti, Jose M.; Brown, Barbara L.; Oostdyk, Rebecca L.; Goetz, Jesse W.

    2010-01-01

    This paper's main purpose is to detail issues and lessons learned regarding designing, integrating, and implementing Fault Detection Isolation and Recovery (FDIR) for Constellation Exploration Program (CxP) Ground Operations at Kennedy Space Center (KSC). Part of the0 overall implementation of National Aeronautics and Space Administration's (NASA's) CxP, FDIR is being implemented in three main components of the program (Ares, Orion, and Ground Operations/Processing). While not initially part of the design baseline for the CxP Ground Operations, NASA felt that FDIR is important enough to develop, that NASA's Exploration Systems Mission Directorate's (ESMD's) Exploration Technology Development Program (ETDP) initiated a task for it under their Integrated System Health Management (ISHM) research area. This task, referred to as the FDIIR project, is a multi-year multi-center effort. The primary purpose of the FDIR project is to develop a prototype and pathway upon which Fault Detection and Isolation (FDI) may be transitioned into the Ground Operations baseline. Currently, Qualtech Systems Inc (QSI) Commercial Off The Shelf (COTS) software products Testability Engineering and Maintenance System (TEAMS) Designer and TEAMS RDS/RT are being utilized in the implementation of FDI within the FDIR project. The TEAMS Designer COTS software product is being utilized to model the system with Functional Fault Models (FFMs). A limited set of systems in Ground Operations are being modeled by the FDIR project, and the entire Ares Launch Vehicle is being modeled under the Functional Fault Analysis (FFA) project at Marshall Space Flight Center (MSFC). Integration of the Ares FFMs and the Ground Processing FFMs is being done under the FDIR project also utilizing the TEAMS Designer COTS software product. One of the most significant challenges related to integration is to ensure that FFMs developed by different organizations can be integrated easily and without errors. Software Interface Control Documents (ICDs) for the FFMs and their usage will be addressed as the solution to this issue. In particular, the advantages and disadvantages of these ICDs across physically separate development groups will be delineated.

  13. [Development method of healthcare information system integration based on business collaboration model].

    PubMed

    Li, Shasha; Nie, Hongchao; Lu, Xudong; Duan, Huilong

    2015-02-01

    Integration of heterogeneous systems is the key to hospital information construction due to complexity of the healthcare environment. Currently, during the process of healthcare information system integration, people participating in integration project usually communicate by free-format document, which impairs the efficiency and adaptability of integration. A method utilizing business process model and notation (BPMN) to model integration requirement and automatically transforming it to executable integration configuration was proposed in this paper. Based on the method, a tool was developed to model integration requirement and transform it to integration configuration. In addition, an integration case in radiology scenario was used to verify the method.

  14. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Current and Advanced Technology ACT control system definition tasks of the Integrated Application of Active Controls (IAAC) Technology project within the Energy Efficient Transport Program are summarized. The systems mechanize six active control functions: (1) pitch augmented stability; (2) angle of attack limiting; (3) lateral/directional augmented stability; (4) gust load alleviation; (5) maneuver load control; and (6) flutter mode control. The redundant digital control systems meet all function requirements with required reliability and declining weight and cost as advanced technology is introduced.

  15. Propulsion System and Orbit Maneuver Integration in CubeSats: Trajectory Control Strategies Using Micro Ion Propulsion

    NASA Technical Reports Server (NTRS)

    Hudson, Jennifer; Martinez, Andres; Petro, Andrew

    2015-01-01

    The Propulsion System and Orbit Maneuver Integration in CubeSats project aims to solve the challenges of integrating a micro electric propulsion system on a CubeSat in order to perform orbital maneuvers and control attitude. This represents a fundamentally new capability for CubeSats, which typically do not contain propulsion systems and cannot maneuver far beyond their initial orbits.

  16. UAS Integration into the NAS Project

    NASA Technical Reports Server (NTRS)

    Bauer, Jeff

    2010-01-01

    The goal of the UAS Integration in the NAS Project is to contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS This goal will be accomplished through a two-phased approach of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Technical objectives include: PHASE 1: a) Validating the key technical areas identified by this project. System-level analyses, a State of the Art Analysis (SOAA), and a ConOps will identify the challenges and barriers preventing routine UAS access to the NAS. b) Developing a national roadmap and gap analysis identifying specific deliverables in the area of operations, procedures, and technologies that will impact future policy decisions. PHASE 2: a) Provide regulators with a methodology for developing airworthiness requirements for UAS and data to support development of certifications standards and regulatory guidance. b) Provide systems-level integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and Pilot Aircraft Interfaces (PAIs) in operationally relevant environments

  17. ? filtering for stochastic systems driven by Poisson processes

    NASA Astrophysics Data System (ADS)

    Song, Bo; Wu, Zheng-Guang; Park, Ju H.; Shi, Guodong; Zhang, Ya

    2015-01-01

    This paper investigates the ? filtering problem for stochastic systems driven by Poisson processes. By utilising the martingale theory such as the predictable projection operator and the dual predictable projection operator, this paper transforms the expectation of stochastic integral with respect to the Poisson process into the expectation of Lebesgue integral. Then, based on this, this paper designs an ? filter such that the filtering error system is mean-square asymptotically stable and satisfies a prescribed ? performance level. Finally, a simulation example is given to illustrate the effectiveness of the proposed filtering scheme.

  18. Observations, Ideas, and Opinions: Systems Engineering and Integration for Return to Flight

    NASA Technical Reports Server (NTRS)

    Gafka, George K.

    2006-01-01

    This presentation addresses project management and systems engineering and integration challenges for return to flight, focusing on the Thermal Protection System Tile Repair Project (TRP). The program documentation philosophy, communication with program requirements flow and philosophy and planned deliverables and documentation are outlined. The development of TRP 'use-as-is' analytical tools is also highlighted and emphasis is placed on the use flight history to assess pre-flight and real-time risk. Additionally, an overview is provided of the repair procedure, including an outline of the logistics deployment chart.

  19. A System-of-Systems Engineering Approach for Australian Land Force Capability Integration

    DTIC Science & Technology

    2012-09-01

    projects are those that, by their very scale and influence, shape many other projects and existing capabilities. Examples include Land 400 Land...challenges to the inherently single- project acquisition ethos predominant in both the defence and civil sectors. For example , see Henshaw (2012). This is...been applied are SoS- type glue projects , for example Land 19 Phase 7, Ground Based Air Missile Defence, and Land 400, the Land Combat Vehicle System

  20. Airspace Concept Evaluation System (ACES), Concept Simulations using Communication, Navigation and Surveillance (CNS) System Models

    NASA Technical Reports Server (NTRS)

    Kubat, Greg; Vandrei, Don

    2006-01-01

    Project Objectives include: a) CNS Model Development; b Design/Integration of baseline set of CNS Models into ACES; c) Implement Enhanced Simulation Capabilities in ACES; d) Design and Integration of Enhanced (2nd set) CNS Models; and e) Continue with CNS Model Integration/Concept evaluations.

  1. Integration of Innovative Technologies for Enhancing Students' Motivation for Science Learning and Career

    ERIC Educational Resources Information Center

    Xie, Yichun; Reider, David

    2014-01-01

    This paper analyzes the outcomes of an innovative technology experience for students and teachers (ITEST) project, Mayor's Youth Technology Corps (MYTCs) in Detroit, MI, which was funded by the NSF ITEST program. The MYTC project offered an integration of two technologies, geographic information system (GIS) and information assurance (IA), to…

  2. The Problem with the Delta Cost Project Database

    ERIC Educational Resources Information Center

    Jaquette, Ozan; Parra, Edna

    2016-01-01

    The Integrated Postsecondary Education System (IPEDS) collects data on Title IV institutions. The Delta Cost Project (DCP) integrated data from multiple IPEDS survey components into a public-use longitudinal dataset. The DCP Database was the basis for dozens of journal articles and a series of influential policy reports. Unfortunately, a flaw in…

  3. Are Global In-Situ Ocean Observations Fit-for-purpose? Applying the Framework for Ocean Observing in the Atlantic.

    NASA Astrophysics Data System (ADS)

    Visbeck, M.; Fischer, A. S.; Le Traon, P. Y.; Mowlem, M. C.; Speich, S.; Larkin, K.

    2015-12-01

    There are an increasing number of global, regional and local processes that are in need of integrated ocean information. In the sciences ocean information is needed to support physical ocean and climate studies for example within the World Climate Research Programme and its CLIVAR project, biogeochemical issues as articulated by the GCP, IMBER and SOLAS projects of ICSU-SCOR and Future Earth. This knowledge gets assessed in the area of climate by the IPCC and biodiversity by the IPBES processes. The recently released first World Ocean Assessment focuses more on ecosystem services and there is an expectation that the Sustainable Development Goals and in particular Goal 14 on the Ocean and Seas will generate new demands for integrated ocean observing from Climate to Fish and from Ocean Resources to Safe Navigation and on a healthy, productive and enjoyable ocean in more general terms. In recognition of those increasing needs for integrated ocean information we have recently launched the Horizon 2020 AtlantOS project to promote the transition from a loosely-coordinated set of existing ocean observing activities to a more integrated, more efficient, more sustainable and fit-for-purpose Atlantic Ocean Observing System. AtlantOS takes advantage of the Framework for Ocean observing that provided strategic guidance for the design of the project and its outcome. AtlantOS will advance the requirements and systems design, improving the readiness of observing networks and data systems, and engaging stakeholders around the Atlantic. AtlantOS will bring Atlantic nations together to strengthen their complementary contributions to and benefits from the internationally coordinated Global Ocean Observing System (GOOS) and the Blue Planet Initiative of the Global Earth Observation System of Systems (GEOSS). AtlantOS will fill gaps of the in-situ observing system networks and will ensure that their data are readily accessible and useable. AtlantOS will demonstrate the utility of integrating in-situ and remotely sensed Earth observations to produce information products supporting a wide range of sectors. AtlantOS will support activities to share best practice, integrate data streams and promote the standardization of in-situ observations. AtlantOS will promote network integration, optimization and new technologies.

  4. Firefighters Integrated Response Equipment System

    NASA Technical Reports Server (NTRS)

    Kaplan, H.; Abeles, F.

    1978-01-01

    The Firefighters Integrated Response Equipment System (Project FIRES) is a joint National Fire Prevention and Control Administration (NFPCA)/National Aeronautics and Space Administration (NASA) program for the development of an 'ultimate' firefighter's protective ensemble. The overall aim of Project FIRES is to improve firefighter protection against hazards, such as heat, flame, smoke, toxic fumes, moisture, impact penetration, and electricity and, at the same time, improve firefighter performance by increasing maneuverability, lowering weight, and improving human engineering design of his protective ensemble.

  5. Human Systems Integration (HSI) Case Studies from the NASA Constellation Program

    NASA Technical Reports Server (NTRS)

    Baggerman, Susan; Berdich, Debbie; Whitmore, Mihriban

    2009-01-01

    The National Aeronautics and Space Administration (NASA) Constellation Program is responsible for planning and implementing those programs necessary to send human explorers back to the moon, onward to Mars and other destinations in the solar system, and to support missions to the International Space Station. The Constellation Program has the technical management responsibility for all Constellation Projects, including both human rated and non-human rated vehicles such as the Crew Exploration Vehicle, EVA Systems, the Lunar Lander, Lunar Surface Systems, and the Ares I and Ares V rockets. With NASA s new Vision for Space Exploration to send humans beyond Earth orbit, it is critical to consider the human as a system that demands early and continuous user involvement, inclusion in trade offs and analyses, and an iterative "prototype/test/ redesign" process. Personnel at the NASA Johnson Space Center are involved in the Constellation Program at both the Program and Project levels as human system integrators. They ensure that the human is considered as a system, equal to hardware and software vehicle systems. Systems to deliver and support extended human habitation on the moon are extremely complex and unique, presenting new opportunities to employ Human Systems Integration, or HSI practices in the Constellation Program. The purpose of the paper is to show examples of where human systems integration work is successfully employed in the Constellation Program and related Projects, such as in the areas of habitation and early requirements and design concepts.

  6. Biomass District Heat System for Interior Rural Alaska Villages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wall, William A.; Parker, Charles R.

    2014-09-01

    Alaska Village Initiatives (AVI) from the outset of the project had a goal of developing an integrated village approach to biomass in Rural Alaskan villages. A successful biomass project had to be ecologically, socially/culturally and economically viable and sustainable. Although many agencies were supportive of biomass programs in villages none had the capacity to deal effectively with developing all of the tools necessary to build a complete integrated program. AVI had a sharp learning curve as well. By the end of the project with all the completed tasks, AVI developed the tools and understanding to connect all of the dotsmore » of an integrated village based program. These included initially developing a feasibility model that created the capacity to optimize a biomass system in a village. AVI intent was to develop all aspects or components of a fully integrated biomass program for a village. This meant understand the forest resource and developing a sustainable harvest system that included the “right sized” harvest equipment for the scale of the project. Developing a training program for harvesting and managing the forest for regeneration. Making sure the type, quality, and delivery system matched the needs of the type of boiler or boilers to be installed. AVI intended for each biomass program to be of the scale that would create jobs and a sustainable business.« less

  7. I.T.S. camera deployment and systems integration P.I.N. 4ITV.09.121 : evaluation

    DOT National Transportation Integrated Search

    2006-08-01

    The Monroe County Department of Transportation (MCDOT) has built upon the success of its first computerized traffic signal system. The system has been operational since 1985. In the late 1990s the Department initiated a project to integrate Intell...

  8. INTEGRATED AIR POLLUTION CONTROL SYSTEM, VERSION 4.0 - VOLUME 1: USER'S GUIDE

    EPA Science Inventory

    The Integrated Air Pollution Control System (IAPCS) was developed for the U.S. EPA's Air and Energy Engineering Research Laboratory to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, and ...

  9. Real-time adaptive ramp metering : phase I, MILOS proof of concept (multi-objective, integrated, large-scale, optimized system).

    DOT National Transportation Integrated Search

    2006-12-01

    Over the last several years, researchers at the University of Arizonas ATLAS Center have developed an adaptive ramp : metering system referred to as MILOS (Multi-Objective, Integrated, Large-Scale, Optimized System). The goal of this project : is ...

  10. Implementation of Service Learning and Civic Engagement for Computer Information Systems Students through a Course Project at the Hashemite University

    ERIC Educational Resources Information Center

    Al-Khasawneh, Ahmad; Hammad, Bashar K.

    2013-01-01

    Service learning methodologies provide information systems students with the opportunity to create and implement systems in real-world, public service-oriented social contexts. This paper presents a case study of integrating a service learning project into an undergraduate Computer Information Systems course titled "Information Systems"…

  11. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  12. Evaluation of the Idaho Transportation Department integrated road-weather information system

    DOT National Transportation Integrated Search

    2005-02-02

    This report presents the results of FHWA's evaluation of the Idaho Transportation Department's (ITD) integration of its Road-Weather Information System (RWIS). The ITD RWIS project was selected for evaluation because it held significant potential to ...

  13. Uncoupling File System Components for Bridging Legacy and Modern Storage Architectures

    NASA Astrophysics Data System (ADS)

    Golpayegani, N.; Halem, M.; Tilmes, C.; Prathapan, S.; Earp, D. N.; Ashkar, J. S.

    2016-12-01

    Long running Earth Science projects can span decades of architectural changes in both processing and storage environments. As storage architecture designs change over decades such projects need to adjust their tools, systems, and expertise to properly integrate such new technologies with their legacy systems. Traditional file systems lack the necessary support to accommodate such hybrid storage infrastructure resulting in more complex tool development to encompass all possible storage architectures used for the project. The MODIS Adaptive Processing System (MODAPS) and the Level 1 and Atmospheres Archive and Distribution System (LAADS) is an example of a project spanning several decades which has evolved into a hybrid storage architecture. MODAPS/LAADS has developed the Lightweight Virtual File System (LVFS) which ensures a seamless integration of all the different storage architectures, including standard block based POSIX compliant storage disks, to object based architectures such as the S3 compliant HGST Active Archive System, and the Seagate Kinetic disks utilizing the Kinetic Protocol. With LVFS, all analysis and processing tools used for the project continue to function unmodified regardless of the underlying storage architecture enabling MODAPS/LAADS to easily integrate any new storage architecture without the costly need to modify existing tools to utilize such new systems. Most file systems are designed as a single application responsible for using metadata to organizing the data into a tree, determine the location for data storage, and a method of data retrieval. We will show how LVFS' unique approach of treating these components in a loosely coupled fashion enables it to merge different storage architectures into a single uniform storage system which bridges the underlying hybrid architecture.

  14. Data base systems in electronic design engineering

    NASA Technical Reports Server (NTRS)

    Williams, D.

    1980-01-01

    The concepts of an integrated design data base system (DBMS) as it might apply to an electronic design company are discussed. Data elements of documentation, project specifications, project tracking, firmware, software, electronic and mechanical design can be integrated and managed through a single DBMS. Combining the attributes of a DBMS data handler with specialized systems and functional data can provide users with maximum flexibility, reduced redundancy, and increased overall systems performance. Although some system overhead is lost due to redundancy in transitory data, it is believed the combination of the two data types is advisable rather than trying to do all data handling through a single DBMS.

  15. The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

    NASA Technical Reports Server (NTRS)

    Fatig, Curtis; Ochs, William; Johns, Alan; Seaton, Bonita; Adams, Cynthia; Wasiak, Francis; Jones, Ronald; Jackson, Wallace

    2012-01-01

    The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

  16. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  17. IDEAS and App Development Internship in Hardware and Software Design

    NASA Technical Reports Server (NTRS)

    Alrayes, Rabab D.

    2016-01-01

    In this report, I will discuss the tasks and projects I have completed while working as an electrical engineering intern during the spring semester of 2016 at NASA Kennedy Space Center. In the field of software development, I completed tasks for the G-O Caching Mobile App and the Asbestos Management Information System (AMIS) Web App. The G-O Caching Mobile App was written in HTML, CSS, and JavaScript on the Cordova framework, while the AMIS Web App is written in HTML, CSS, JavaScript, and C# on the AngularJS framework. My goals and objectives on these two projects were to produce an app with an eye-catching and intuitive User Interface (UI), which will attract more employees to participate; to produce a fully-tested, fully functional app which supports workforce engagement and exploration; to produce a fully-tested, fully functional web app that assists technicians working in asbestos management. I also worked in hardware development on the Integrated Display and Environmental Awareness System (IDEAS) wearable technology project. My tasks on this project were focused in PCB design and camera integration. My goals and objectives for this project were to successfully integrate fully functioning custom hardware extenders on the wearable technology headset to minimize the size of hardware on the smart glasses headset for maximum user comfort; to successfully integrate fully functioning camera onto the headset. By the end of this semester, I was able to successfully develop four extender boards to minimize hardware on the headset, and assisted in integrating a fully-functioning camera into the system.

  18. Development Activities on Airbreathing Combined Cycle Engines

    NASA Technical Reports Server (NTRS)

    McArthur, J. Craig; Lyles, Garry (Technical Monitor)

    2000-01-01

    Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.

  19. Florida Schoolhouse Systems Project. First Phase Report.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee.

    A description is presented of the first phase of the Florida Schoolhouse Systems Project. Following a presentation of the background and objectives of the SSP, the development of integrated building systems is considered with regard to--(1) stimulation of research and development, (2) performance specifications and competitive bidding, and (3)…

  20. PROJECT REPORT : Alaska-Metro/Rural Deployment Project CARS/511 – Anchorage Integration

    DOT National Transportation Integrated Search

    2009-03-19

    The Alaska Department of Transportation & Public Facilities (ADOT&PF) initiated the Alaska Travel Information System by joining the Condition Acquisition & Reporting System/511 (CARS/511) Pooled Fund in October 2002. CARS was jointly developed by the...

  1. Advanced Caution and Warning System, Final Report - 2011

    NASA Technical Reports Server (NTRS)

    Spirkovska, Lilly; Aaseng, Gordon; Iverson, David; McCann, Robert S.; Robinson, Peter; Dittemore, Gary; Liolios, Sotirios; Baskaran, Vijay; Johnson, Jeremy; Lee, Charles; hide

    2013-01-01

    The work described in this report is a continuation of the ACAWS work funded in fiscal year (FY) 2010 under the Exploration Technology Development Program (ETDP), Integrated Systems Health Management (ISHM) project. In FY 2010, we developed requirements for an ACAWS system and vetted the requirements with potential users via a concept demonstration system. In FY 2011, we developed a working prototype of aspects of that concept, with placeholders for technologies to be fully developed in future phases of the project. The objective is to develop general capability to assist operators with system health monitoring and failure diagnosis. Moreover, ACAWS was integrated with the Discrete Controls (DC) task of the Autonomous Systems and Avionics (ASA) project. The primary objective of DC is to demonstrate an electronic and interactive procedure display environment and multiple levels of automation (automatic execution by computer, execution by computer if the operator consents, and manual execution by the operator).

  2. Accruals for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Data Integration 2000 Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf product solution with commercially proven business processes. The COTS product solution set, of PassPort and People Soft software, supports finance, supply and chemical management/Material Safety Data Sheet, human resources. Accruals are made at the project level. At the inception of each project, Project Management and the Accounts Payable Group make a mutual decision on whether periodic accrual entries should be made for it.

  3. EXOS research on master controllers for robotic devices

    NASA Technical Reports Server (NTRS)

    Marcus, Beth A.; An, Ben; Eberman, Brian

    1992-01-01

    Two projects are currently being conducted by EXOS under the Small Business Innovation Research (SBIR) program with NASA. One project will develop a force feedback device for controlling robot hands, the other will develop an elbow and shoulder exoskeleton which can be integrated with other EXOS devices to provide whole robot arm and hand control. Aspects covered are the project objectives, important research issues which have arisen during the developments, and interim results of the projects. The Phase 1 projects currently underway will result in hardware prototypes and identification of research issues required for complete system development and/or integration.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pennock, Kenneth; Makarov, Yuri V.; Rajagopal, Sankaran

    The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of suchmore » a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.« less

  5. Approach-Phase Precision Landing with Hazard Relative Navigation: Terrestrial Test Campaign Results of the Morpheus/ALHAT Project

    NASA Technical Reports Server (NTRS)

    Crain, Timothy P.; Bishop, Robert H.; Carson, John M., III; Trawny, Nikolas; Hanak, Chad; Sullivan, Jacob; Christian, John; DeMars, Kyle; Campbell, Tom; Getchius, Joel

    2016-01-01

    The Morpheus Project began in late 2009 as an ambitious e ort code-named Project M to integrate three ongoing multi-center NASA technology developments: humanoid robotics, liquid oxygen/liquid methane (LOX/LCH4) propulsion and Autonomous Precision Landing and Hazard Avoidance Technology (ALHAT) into a single engineering demonstration mission to be own to the Moon by 2013. The humanoid robot e ort was redirected to a deploy- ment of Robonaut 2 on the International Space Station in February of 2011 while Morpheus continued as a terrestrial eld test project integrating the existing ALHAT Project's tech- nologies into a sub-orbital ight system using the world's rst LOX/LCH4 main propulsion and reaction control system fed from the same blowdown tanks. A series of 33 tethered tests with the Morpheus 1.0 vehicle and Morpheus 1.5 vehicle were conducted from April 2011 - December 2013 before successful, sustained free ights with the primary Vertical Testbed (VTB) navigation con guration began with Free Flight 3 on December 10, 2013. Over the course of the following 12 free ights and 3 tethered ights, components of the ALHAT navigation system were integrated into the Morpheus vehicle, operations, and ight control loop. The ALHAT navigation system was integrated and run concurrently with the VTB navigation system as a reference and fail-safe option in ight (see touchdown position esti- mate comparisons in Fig. 1). Flight testing completed with Free Flight 15 on December 15, 2014 with a completely autonomous Hazard Detection and Avoidance (HDA), integration of surface relative and Hazard Relative Navigation (HRN) measurements into the onboard dual-state inertial estimator Kalman lter software, and landing within 2 meters of the VTB GPS-based navigation solution at the safe landing site target. This paper describes the Mor- pheus joint VTB/ALHAT navigation architecture, the sensors utilized during the terrestrial ight campaign, issues resolved during testing, and the navigation results from the ight tests.

  6. INTEGRATED AIR POLLUTION CONTROL SYSTEM VERSION 5.0 - VOLUME 2: TECHNICAL DOCUMENTATION

    EPA Science Inventory

    The three volume report and two diskettes document the Integrated Air Pollution Control System (IAPCS), developed for the U.S. EPA to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, an eq...

  7. INTEGRATED AIR POLLUTION CONTROL SYSTEM VERSION 5.0 - VOLUME 3: PROGRAMMER'S MAINTENANCE MANUAL

    EPA Science Inventory

    The three volume report and two diskettes document the Integrated Air Pollution Control System (IAPCS), developed for the U.S. EPA to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, an eq...

  8. INTEGRATED AIR POLLUTION CONTROL SYSTEM VERSION 5.0 - VOLUME 1: USER'S GUIDE

    EPA Science Inventory

    The three volume report and two diskettes document the Integrated Air Pollution Control System (IAPCS), developed for the U.S. EPA to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, an eq...

  9. INTEGRATED AIR POLLUTION CONTROL SYSTEM, VERSION 4.0 - VOLUME 3: PROGRAMMER'S MAINTENACE MANUAL

    EPA Science Inventory

    The Integrated Air Pollution Control System (IAPCS) was developed for the U.S. EPA's Air and Energy Engineering Research Laboratory to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, and ...

  10. INTEGRATED AIR POLLUTION CONTROL SYSTEM, VERSION 4.0 - VOLUME 2: TECHNICAL DOCUMENTATION MANUAL

    EPA Science Inventory

    The Integrated Air Pollution Control System (IAPCS) was developed for the U.S. EPA's Air and Energy Engineering Research Laboratory to estimate costs and performance for emission control systems applied to coal-fired utility boilers. The model can project a material balance, and ...

  11. Computer Integrated Manufacturing: Physical Modelling Systems Design. A Personal View.

    ERIC Educational Resources Information Center

    Baker, Richard

    A computer-integrated manufacturing (CIM) Physical Modeling Systems Design project was undertaken in a time of rapid change in the industrial, business, technological, training, and educational areas in Australia. A specification of a manufacturing physical modeling system was drawn up. Physical modeling provides a flexibility and configurability…

  12. Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER

    NASA Technical Reports Server (NTRS)

    Anderson, Herbert A.; Williams, Antony; Pierce, Gregory

    2016-01-01

    The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.

  13. Development of a conceptual framework toward an integrated transportation system (continued).

    DOT National Transportation Integrated Search

    2011-07-01

    As a continuing effort documented in the first phase project UMAR19-13, this research focuses : on the design of a prototype application under the framework toward an Integrated : Transportation System. More specifically, this research aims at improv...

  14. Status of ERA Vehicle System Integration Technology Demonstrators

    NASA Technical Reports Server (NTRS)

    Flamm, Jeffrey D.; Fernandez, Hamilton; Khorrami, Mehdi; James, Kevin D.; Thomas, Russell

    2015-01-01

    The Environmentally Responsible Aviation (ERA) Project within the Integrated Systems Research Program (ISRP) of the NASA Aeronautics Research Mission Directorate (ARMD) has the responsibility to explore and document the feasibility, benefits, and technical risk of air vehicle concepts and enabling technologies that will reduce the impact of aviation on the environment. The primary goal of the ERA Project is to select air vehicle concepts and technologies that can simultaneously reduce fuel burn, noise, and emissions. In addition, the ERA Project will identify and mitigate technical risk and transfer knowledge to the aeronautics community at large so that new technologies and vehicle concepts can be incorporated into the future design of aircraft.

  15. Getting expert systems off the ground: Lessons learned from integrating model-based diagnostics with prototype flight hardware

    NASA Technical Reports Server (NTRS)

    Stephan, Amy; Erikson, Carol A.

    1991-01-01

    As an initial attempt to introduce expert system technology into an onboard environment, a model based diagnostic system using the TRW MARPLE software tool was integrated with prototype flight hardware and its corresponding control software. Because this experiment was designed primarily to test the effectiveness of the model based reasoning technique used, the expert system ran on a separate hardware platform, and interactions between the control software and the model based diagnostics were limited. While this project met its objective of showing that model based reasoning can effectively isolate failures in flight hardware, it also identified the need for an integrated development path for expert system and control software for onboard applications. In developing expert systems that are ready for flight, artificial intelligence techniques must be evaluated to determine whether they offer a real advantage onboard, identify which diagnostic functions should be performed by the expert systems and which are better left to the procedural software, and work closely with both the hardware and the software developers from the beginning of a project to produce a well designed and thoroughly integrated application.

  16. Global asymptotic stability of density dependent integral population projection models.

    PubMed

    Rebarber, Richard; Tenhumberg, Brigitte; Townley, Stuart

    2012-02-01

    Many stage-structured density dependent populations with a continuum of stages can be naturally modeled using nonlinear integral projection models. In this paper, we study a trichotomy of global stability result for a class of density dependent systems which include a Platte thistle model. Specifically, we identify those systems parameters for which zero is globally asymptotically stable, parameters for which there is a positive asymptotically stable equilibrium, and parameters for which there is no asymptotically stable equilibrium. Copyright © 2011 Elsevier Inc. All rights reserved.

  17. Data Requirement (DR) MA-03: Payload missions integration. [Spacelab payloads

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Project management and payload integration requirements definition activities are reported. Mission peculiar equipment; systems integration; ground operations analysis and requirement definition; safety and quality assurance; and support systems development are examined for payloads planned for the following missions: EOM-1; SL-2; Sl-3 Astro-1; MSL-2; EASE/ACCESS; MPESS; and the middeck ADSF flight.

  18. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.

  19. Integrating the Language Arts. Learning Package No. 48.

    ERIC Educational Resources Information Center

    Chao, Han-Hua, Comp.; Smith, Carl, Ed.

    Originally developed as part of a project for the Department of Defense Schools (DoDDS) system, this learning package on integrating the language arts is designed for teachers who wish to upgrade or expand their teaching skills on their own. The package includes an overview of the project; a comprehensive search of the ERIC database; a lecture…

  20. The Research Path to the Virtual Class. ZIFF Papiere 105.

    ERIC Educational Resources Information Center

    Rajasingham, Lalita

    This paper describes a project conducted in 1991-92, based on research conducted in 1986-87 that demonstrated the need for a telecommunications system with the capacity of integrated services digital networks (ISDN) that would allow for sound, vision, and integrated computer services. Called the Tri-Centre Project, it set out to explore, from the…

  1. Implementation of Service Learning and Civic Engagement for Students of Computer Information Systems through a Course Project at the Hashemite University

    ERIC Educational Resources Information Center

    Al-Khasawneh, Ahmad; Hammad, Bashar K.

    2015-01-01

    Service learning methodologies provide students of information systems with the opportunity to create and implement systems in real-world, public service-oriented social contexts. This paper presents a case study which involves integrating a service learning project into an undergraduate Computer Information Systems course entitled…

  2. Implementation of rolling weight deflectometer (RWD) in PMS and pavement preservation.

    DOT National Transportation Integrated Search

    2009-09-01

    The objective of this project is two-fold. First, this project will develop a methodology to integrate collected RWD data into the existing pavement management system via the geographic information system. Second, collected data will be used to valid...

  3. Scaleable Clean Aluminum Melting Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Han, Q.; Das, S.K.

    2008-02-15

    The project entitled 'Scaleable Clean Aluminum Melting Systems' was a Cooperative Research and Development Agreements (CRADAs) between Oak Ridge National Laboratory (ORNL) and Secat Inc. The three-year project was initially funded for the first year and was then canceled due to funding cuts at the DOE headquarters. The limited funds allowed the research team to visit industrial sites and investigate the status of using immersion heaters for aluminum melting applications. Primary concepts were proposed on the design of furnaces using immersion heaters for melting. The proposed project can continue if the funding agency resumes the funds to this research. Themore » objective of this project was to develop and demonstrate integrated, retrofitable technologies for clean melting systems for aluminum in both the Metal Casting and integrated aluminum processing industries. The scope focused on immersion heating coupled with metal circulation systems that provide significant opportunity for energy savings as well as reduction of melt loss in the form of dross. The project aimed at the development and integration of technologies that would enable significant reduction in the energy consumption and environmental impacts of melting aluminum through substitution of immersion heating for the conventional radiant burner methods used in reverberatory furnaces. Specifically, the program would couple heater improvements with furnace modeling that would enable cost-effective retrofits to a range of existing furnace sizes, reducing the economic barrier to application.« less

  4. Project Morpheus: Lean Development of a Terrestrial Flight Testbed for Maturing NASA Lander Technologies

    NASA Technical Reports Server (NTRS)

    Devolites, Jennifer L.; Olansen, Jon B.

    2015-01-01

    NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing that is designed to serve as a testbed for advanced spacecraft technologies. The lander vehicle, propelled by a Liquid Oxygen (LOX)/Methane engine and sized to carry a 500kg payload to the lunar surface, provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. In 2012, Morpheus began integrating the Autonomous Landing and Hazard Avoidance Technology (ALHAT) sensors and software onto the vehicle in order to demonstrate safe, autonomous landing and hazard avoidance. From the beginning, one of goals for the Morpheus Project was to streamline agency processes and practices. The Morpheus project accepted a challenge to tailor the traditional NASA systems engineering approach in a way that would be appropriate for a lower cost, rapid prototype engineering effort, but retain the essence of the guiding principles. This paper describes the tailored project life cycle and systems engineering approach for the Morpheus project, including the processes, tools, and amount of rigor employed over the project's multiple lifecycles since the project began in fiscal year (FY) 2011.

  5. Report on all ARRA Funded Technical Work

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. Thismore » project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.« less

  6. The Use of Radar to Improve Rainfall Estimation over the Tennessee and San Joaquin River Valleys

    NASA Technical Reports Server (NTRS)

    Petersen, Walter A.; Gatlin, Patrick N.; Felix, Mariana; Carey, Lawrence D.

    2010-01-01

    This slide presentation provides an overview of the collaborative radar rainfall project between the Tennessee Valley Authority (TVA), the Von Braun Center for Science & Innovation (VCSI), NASA MSFC and UAHuntsville. Two systems were used in this project, Advanced Radar for Meteorological & Operational Research (ARMOR) Rainfall Estimation Processing System (AREPS), a demonstration project of real-time radar rainfall using a research radar and NEXRAD Rainfall Estimation Processing System (NREPS). The objectives, methodology, some results and validation, operational experience and lessons learned are reviewed. The presentation. Another project that is using radar to improve rainfall estimations is in California, specifically the San Joaquin River Valley. This is part of a overall project to develop a integrated tool to assist water management within the San Joaquin River Valley. This involves integrating several components: (1) Radar precipitation estimates, (2) Distributed hydro model, (3) Snowfall measurements and Surface temperature / moisture measurements. NREPS was selected to provide precipitation component.

  7. The scientific data acquisition system of the GAMMA-400 space project

    NASA Astrophysics Data System (ADS)

    Bobkov, S. G.; Serdin, O. V.; Gorbunov, M. S.; Arkhangelskiy, A. I.; Topchiev, N. P.

    2016-02-01

    The description of scientific data acquisition system (SDAS) designed by SRISA for the GAMMA-400 space project is presented. We consider the problem of different level electronics unification: the set of reliable fault-tolerant integrated circuits fabricated on Silicon-on-Insulator 0.25 mkm CMOS technology and the high-speed interfaces and reliable modules used in the space instruments. The characteristics of reliable fault-tolerant very large scale integration (VLSI) technology designed by SRISA for the developing of computation systems for space applications are considered. The scalable net structure of SDAS based on Serial RapidIO interface including real-time operating system BAGET is described too.

  8. Integrative freight demand management in the New York City metropolitan area.

    DOT National Transportation Integrated Search

    2010-09-01

    This project is one of the first in the world that has successfully integrated the use of remote sensing : technologyin this case Global Positioning System (GPS) enabled cell phonesas part of a system that : effectively reduces truck traffic in...

  9. Integrated Passive Biological Treatment System/ Mine Waste Technology Program Report #16

    EPA Science Inventory

    This report summarizes the results of the Mine Waste Technology Program (MWTP) Activity III, Project 16, Integrated, Passive Biological Treatment System, funded by the United States Environmental Protection Agency (EPA) and jointly administered by EPA and the United States Depar...

  10. Integrated corridor management initiative : demonstration phase evaluation, San Diego decision support system analysis test plan.

    DOT National Transportation Integrated Search

    2000-01-01

    This report demonstrates the benefits and potential pitfalls of deploying and operating an integrated freeway and arterial management system. In particular, it discusses the lessons learned about the Medical Center Corridor (MCC) Project deployed in ...

  11. ARC Research Areas and Projects

    Science.gov Websites

    support ground vehicle system-of-systems integration. This integration may involve not just a vehicle but also the humans inside and the support systems outside, as well as a wide variety of missions with issues pertaining to design, analysis and optimization of ground vehicle systems. Work is organized in

  12. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  13. Architectural approaches for HL7-based health information systems implementation.

    PubMed

    López, D M; Blobel, B

    2010-01-01

    Information systems integration is hard, especially when semantic and business process interoperability requirements need to be met. To succeed, a unified methodology, approaching different aspects of systems architecture such as business, information, computational, engineering and technology viewpoints, has to be considered. The paper contributes with an analysis and demonstration on how the HL7 standard set can support health information systems integration. Based on the Health Information Systems Development Framework (HIS-DF), common architectural models for HIS integration are analyzed. The framework is a standard-based, consistent, comprehensive, customizable, scalable methodology that supports the design of semantically interoperable health information systems and components. Three main architectural models for system integration are analyzed: the point to point interface, the messages server and the mediator models. Point to point interface and messages server models are completely supported by traditional HL7 version 2 and version 3 messaging. The HL7 v3 standard specification, combined with service-oriented, model-driven approaches provided by HIS-DF, makes the mediator model possible. The different integration scenarios are illustrated by describing a proof-of-concept implementation of an integrated public health surveillance system based on Enterprise Java Beans technology. Selecting the appropriate integration architecture is a fundamental issue of any software development project. HIS-DF provides a unique methodological approach guiding the development of healthcare integration projects. The mediator model - offered by the HIS-DF and supported in HL7 v3 artifacts - is the more promising one promoting the development of open, reusable, flexible, semantically interoperable, platform-independent, service-oriented and standard-based health information systems.

  14. Building Systems: Passing Fad or Basic Tool?

    ERIC Educational Resources Information Center

    Rezab, Donald

    Building systems can be traced back to a 1516 A.D. project by Leonardo da Vinci and to a variety of prefabrication projects in every succeeding century. When integrated into large and repetitive spatial units through careful design, building systems can produce an architecture of the first order, as evidenced in the award winning design of…

  15. Case study in health information management: strategic planning.

    PubMed

    Homan, C V

    1992-08-01

    The strategic planning process has proven to be invaluable to Riverside Hospital's success. Involvement of all levels of the organization and integration of plans solidifies organizational commitments and provides a framework that assures accomplishment of overall goals. With major developments in computerization of medical records and other systems that support patient care data analysis on the horizon, Riverside's integrated plans are defining crucial information system projects. As the pool of available resources for projects continues to shrink, the planning format described assures funding of information system needs that will secure a position for Riverside in the health care marketplace of the future.

  16. Development Of Autonomous Systems

    NASA Astrophysics Data System (ADS)

    Kanade, Takeo

    1989-03-01

    In the last several years at the Robotics Institute of Carnegie Mellon University, we have been working on two projects for developing autonomous systems: Nablab for Autonomous Land Vehicle and Ambler for Mars Rover. These two systems are for different purposes: the Navlab is a four-wheeled vehicle (van) for road and open terrain navigation, and the Ambler is a six-legged locomotor for Mars exploration. The two projects, however, share many common aspects. Both are large-scale integrated systems for navigation. In addition to the development of individual components (eg., construction and control of the vehicle, vision and perception, and planning), integration of those component technologies into a system by means of an appropriate architecture is a major issue.

  17. NREL Advances Wells Fargo Innovation Incubator Projects | Energy Systems

    Science.gov Websites

    Integration Facility | NREL NREL Advances Wells Fargo Innovation Incubator Projects NREL Advances Wells Fargo Innovation Incubator Projects NREL has provided technical support and validation testing at the ESIF to help advance Wells Fargo Innovation Incubator (IN2) projects. The IN2 program helps

  18. The principle of integrality of care in the political-pedagogical projects of nursing programs

    PubMed Central

    Kloh, Daiana; Reibnitz, Kenya Schmidt; Boehs, Astrid Eggert; Wosny, Antônio de Miranda; de Lima, Margarete Maria

    2014-01-01

    Objective: to identify the political-pedagogical projects of the undergraduate nursing programs in Santa Catarina, Brazil according to the guidelines of the Ministries of Health and Education, considering the education of professionals under the principle of integrality. Method: documentary study with a qualitative approach. Nine projects were analyzed. Results: the colleges from the Southern region of Brazil are gradually incorporating the theoretical framework of the Brazilian health system and curricular guidelines, which includes the principle of integrality of care, into their political-pedagogical projects of undergraduate nursing programs. Some institutions strictly follow the curricular guidelines, while others make their own interpretation. Conclusion: most teaching institutions do not provide pedagogical support to students. PMID:25054869

  19. Integrating ecological and social knowledge: learning from CHANS research

    Treesearch

    Bruce Shindler; Thomas A. Spies; John P. Bolte; Jeffrey D. Kline

    2017-01-01

    Scientists are increasingly called upon to integrate across ecological and social disciplines to tackle complex coupled human and natural system (CHANS) problems. Integration of these disciplines is challenging and many scientists do not have experience with large integrated research projects. However, much can be learned about the complicated process of integration...

  20. Textbooks on the Move: Transforming a Textbook Collection

    ERIC Educational Resources Information Center

    Ferguson, Yoko Inagi; Riley-Reid, Trevar

    2017-01-01

    Recently, The City College of New York (CCNY) libraries engaged in a collaborative project to transfer the bibliographic holdings for textbook course reserves to a new module when their integrated library systems, the Ex Libris Aleph Integrated Library System, underwent a system upgrade. In this article, the Chief of Circulation and the Chief of…

  1. Early Childhood Technology Integrated Instructional System (EC-TIIS) Phase 1: A Final Report

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Robinson, Linda; Schneider, Carol

    2004-01-01

    The Early Childhood Technology Integrated Instructional System (EC-TIIS), a Steppingstones of Technology Innovation Phase 1--Development project, was developed by the Center for Best Practices in Early Childhood (the Center) at Western Illinois University as an online instructional system. EC-TIIS' ultimate goal was to improve technology services…

  2. The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration

    NASA Technical Reports Server (NTRS)

    McGhee, D. S.

    2006-01-01

    Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful

  3. RIPE integrity primitives, part 2 (RACE Integrity Primitives Evaluation)

    NASA Astrophysics Data System (ADS)

    Denboer, B.; Boly, J. P.; Bosselaers, A.; Brandt, J.; Chaum, D.; Damgaard, I.; Dichtl, M.; Fumy, W.; Vanderham, M.; Jansen, C. J. A.

    1993-04-01

    A manual intended for those seeking to secure information systems by applying modern cryptography is presented. It represents the successful attainment of goals by RIPE (RACE (Research and development of Advanced Communications technology in Europe) Integrity Primitives Evaluation). The recommended portfolio of integrity primitives, which is the main product of the project, forms the heart of the manual. By integrity, is meant the kinds of security that can be achieved through cryptography, apart from keeping messages secret. Thus included are ways to ensure that stored or communicated data is not illicitly modified, that parties exchanging messages are actually present, and that 'signed' electronic messages can be recognized as authentic by anyone. Of particular concern to the project were the high speed requirements of broadband communication. The project also aimed for completeness in its recommendations. As a result, the portfolio contains primitives, that is building blocks, that can meet most of today's perceived needs for integrity.

  4. RIPE integrity primitives, part 1 (RACE Integrity Primitives Evaluation)

    NASA Astrophysics Data System (ADS)

    Denboer, B.; Boly, J. P.; Bosselaers, A.; Brandt, J.; Chaum, D.; Damgaard, I.; Dichtl, M.; Fumy, W.; Vanderham, M.; Jansen, C. J. A.

    1993-04-01

    A manual intended for those seeking to secure information systems by applying modern cryptography is presented. It represents the successful attainment of goals by RIPE (RACE (Research and development of Advanced Communication technology in Europe) Integrity Primitives Evaluation). The recommended portfolio of integrity primitives, which is the main product of the project, forms the heart of the manual. By integrity, is meant the kinds of security that can be achieved through cryptography, apart from keeping messages secret. Thus included are ways to ensure that stored or communicated data is not illicitly modified, that parties exchanging messages are actually present, and that 'signed' electronic messages can be recognized as authentic by anyone. Of particular concern to the project were the high speed requirements of broadband communication. The project also aimed for completeness in its recommendations. As a result, the portfolio contains primitives, that is building blocks, that can meet most of today's perceived needs for integrity.

  5. An end-users oriented methodology for enhancing the integration of knowledge on soil-water-sediment systems in River Basin Management: an illustration from the AquaTerra project.

    PubMed

    Merly, Corinne; Chapman, Antony; Mouvet, Christophe

    2012-01-01

    Research results in environmental and socio-economic sciences are often under-used by stakeholders involved in the management of natural resources. To minimise this gap, the FP6 EU interdisciplinary project AquaTerra (AT) developed an end-users' integration methodology in order to ensure that the data, knowledge and tools related to the soil-water-sediment system that were generated by the project were delivered in a meaningful way for end-users, thus improving their uptake. The methodology and examples of its application are presented in this paper. From the 408 project deliverables, 96 key findings were identified, 53 related to data and knowledge, and 43 describing advanced tools. River Basin Management (RBM) stakeholders workshops identified 8 main RBM issues and 25 specific stakeholders' questions related to RBM which were classified into seven groups of cross-cutting issues, namely scale, climate change, non-climatic change, the need for systemic approaches, communication and participation, international and inter-basin coordination and collaboration, and the implementation of the Water Framework Directive. The integration methodology enabled an assessment of how AT key findings meet stakeholders' demands, and for each main RBM issue and for each specific question, described the added-value of the AT project in terms of knowledge and tools generated, key parameters to consider, and recommendations that can be made to stakeholders and the wider scientific community. Added value and limitations of the integration methodology and its outcomes are discussed and recommendations are provided to further improve integration methodology and bridge the gaps between scientific research data and their potential uptake by end-users.

  6. Airspace Technology Demonstration 2 (ATD-2) Technology Description Document (TDD)

    NASA Technical Reports Server (NTRS)

    Ging, Andrew; Engelland, Shawn; Capps, Al; Eshow, Michelle; Jung, Yoon; Sharma, Shivanjli; Talebi, Ehsan; Downs, Michael; Freedman, Cynthia; Ngo, Tyler; hide

    2018-01-01

    This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration's (NASA) Airspace Technology Demonstration 2 (ATD-2) project, to be demonstrated beginning in 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA is developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research will be demonstrated at the CLT airport beginning in 2017. Phase 1 will provide the initial demonstration of the integrated system with strategic and tactical scheduling, tactical departure scheduling to an en route meter point, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.

  7. Software Process Automation: Experiences from the Trenches.

    DTIC Science & Technology

    1996-07-01

    Integration of problem database Weaver tions) J Process WordPerfect, All-in-One, Oracle, CM Integration of tools Weaver System K Process Framemaker , CM...handle change requests and problem reports. * Autoplan, a project management tool * Framemaker , a document processing system * Worldview, a document...Cadre, Team Work, FrameMaker , some- thing for requirements traceability, their own homegrown scheduling tool, and their own homegrown tool integrator

  8. Finite-dimensional integrable systems: A collection of research problems

    NASA Astrophysics Data System (ADS)

    Bolsinov, A. V.; Izosimov, A. M.; Tsonev, D. M.

    2017-05-01

    This article suggests a series of problems related to various algebraic and geometric aspects of integrability. They reflect some recent developments in the theory of finite-dimensional integrable systems such as bi-Poisson linear algebra, Jordan-Kronecker invariants of finite dimensional Lie algebras, the interplay between singularities of Lagrangian fibrations and compatible Poisson brackets, and new techniques in projective geometry.

  9. Recommendation of a More Effective Alternative to the NASA Launch Services Program Mission Integration Reporting System (MIRS) and Implementation of Updates to the Mission Plan

    NASA Technical Reports Server (NTRS)

    Dunn, Michael R.

    2014-01-01

    Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.

  10. The environmental control and life support system advanced automation project

    NASA Technical Reports Server (NTRS)

    Dewberry, Brandon S.

    1991-01-01

    The objective of the ECLSS Advanced Automation project includes reduction of the risk associated with the integration of new, beneficial software techniques. Demonstrations of this software to baseline engineering and test personnel will show the benefits of these techniques. The advanced software will be integrated into ground testing and ground support facilities, familiarizing its usage by key personnel.

  11. UAS in the NAS Flight Test Series 3 Overview

    NASA Technical Reports Server (NTRS)

    Murphy, James R.

    2015-01-01

    The UAS Integration in the NAS Project is conducting a series of flight tests to acheive the following objectives: 1.) Validate results previously collected during project simulations with live data 2.) Evaluate TCAS IISS interoperability 3.) Test fully integrated system in a relevant live test environment 4.) Inform final DAA and C2 MOPS 5.) Reduce risk for Flight Test Series 4.

  12. Enhancing the Interdisciplinary Perspective in the Marketing Management Decision Process through an Applied, Integrated, Client Project

    ERIC Educational Resources Information Center

    Askim-Lovseth, Mary K.; O'Keefe, Timothy P.

    2012-01-01

    Businesses function within a cross-functional, integrative setting, and this necessitates providing a learning environment for students that is comparable to real-life work projects. Two upper-level university classes in marketing and information systems worked collaboratively with a snack food business to design and build a Web site based on a…

  13. Safety in Schools: An Integral Approach

    ERIC Educational Resources Information Center

    Gairin, Joaquin; Castro, Diego

    2011-01-01

    The present paper summarizes a research project into integral safety in schools. The aims of this particular research are, firstly, to evaluate the degree of integral safety in schools, secondly, to propose means for improving prevention and integral safety systems and thirdly, to identify the characteristics of safety culture. The field work was…

  14. Integrating information from disparate sources: the Walter Reed National Surgical Quality Improvement Program Data Transfer Project.

    PubMed

    Nelson, Victoria; Nelson, Victoria Ruth; Li, Fiona; Green, Susan; Tamura, Tomoyoshi; Liu, Jun-Min; Class, Margaret

    2008-11-06

    The Walter Reed National Surgical Quality Improvement Program Data Transfer web module integrates with medical and surgical information systems, and leverages outside standards, such as the National Library of Medicine's RxNorm, to process surgical and risk assessment data. Key components of the project included a needs assessment with nurse reviewers and a data analysis for federated (standards were locally controlled) data sources. The resulting interface streamlines nurse reviewer workflow by integrating related tasks and data.

  15. Advanced Ground Systems Maintenance Enterprise Architecture Project

    NASA Technical Reports Server (NTRS)

    Harp, Janicce Leshay

    2014-01-01

    The project implements an architecture for delivery of integrated health management capabilities for the 21st Century launch complex. Capabilities include anomaly detection, fault isolation, prognostics and physics-based diagnostics.

  16. Integrated Main Propulsion System Performance Reconstruction Process/Models

    NASA Technical Reports Server (NTRS)

    Lopez, Eduardo; Elliott, Katie; Snell, Steven; Evans, Michael

    2013-01-01

    The Integrated Main Propulsion System (MPS) Performance Reconstruction process provides the MPS post-flight data files needed for postflight reporting to the project integration management and key customers to verify flight performance. This process/model was used as the baseline for the currently ongoing Space Launch System (SLS) work. The process utilizes several methodologies, including multiple software programs, to model integrated propulsion system performance through space shuttle ascent. It is used to evaluate integrated propulsion systems, including propellant tanks, feed systems, rocket engine, and pressurization systems performance throughout ascent based on flight pressure and temperature data. The latest revision incorporates new methods based on main engine power balance model updates to model higher mixture ratio operation at lower engine power levels.

  17. Leveraging the Unified Access Framework: A Tale of an Integrated Ocean Data Prototype

    NASA Astrophysics Data System (ADS)

    O'Brien, K.; Kern, K.; Smith, B.; Schweitzer, R.; Simons, R.; Mendelssohn, R.; Diggs, S. C.; Belbeoch, M.; Hankin, S.

    2014-12-01

    The Tropical Pacific Observing System (TPOS) has been functioning and capturing measurements since the mid 1990s during the very successful Tropical Ocean Global Atmosphere (TOGA) project. Unfortunately, in the current environment, some 20 years after the end of the TOGA project, sustaining the observing system is proving difficult. With the many advances in methods of observing the ocean, a group of scientists is taking a fresh look at what the Tropical Pacific Observing System requires for sustainability. This includes utilizing a wide variety of observing system platforms, including Argo floats, unmanned drifters, moorings, ships, etc. This variety of platforms measuring ocean data also provides a significant challenge in terms of integrated data management. It is recognized that data and information management is crucial to the success and impact of any observing system. In order to be successful, it is also crucial to avoid building stovepipes for data management. To that end, NOAA's Observing System Monitoring Center (OSMC) has been tasked to create a testbed of integrated real time and delayed mode observations for the Tropical Pacific region in support of the TPOS. The observing networks included in the prototype are: Argo floats, OceanSites moorings, drifting buoys, hydrographic surveys, underway carbon observations and, of course, real time ocean measurements. In this presentation, we will discuss how the OSMC project is building the integrated data prototype using existing free and open source software. We will explore how we are leveraging successful data management frameworks pioneered by efforts such as NOAA's Unified Access Framework project. We will also show examples of how conforming to well known conventions and standards allows for discoverability, usability and interoperability of data.

  18. Digital Field Mapping with the British Geological Survey

    NASA Astrophysics Data System (ADS)

    Leslie, Graham; Smith, Nichola; Jordan, Colm

    2014-05-01

    The BGS•SIGMA project was initiated in 2001 in response to a major stakeholder review of onshore mapping within the British Geological Survey (BGS). That review proposed a significant change for BGS with the recommendation that digital methods should be implemented for field mapping and data compilation. The BGS•SIGMA project (System for Integrated Geoscience MApping) is an integrated workflow for geoscientific surveying and visualisation using digital methods for geological data visualisation, recording and interpretation, in both 2D and 3D. The project has defined and documented an underpinning framework of best practice for survey and information management, best practice that has then informed the design brief and specification for a toolkit to support this new methodology. The project has now delivered BGS•SIGMA2012. BGS•SIGMA2012 is a integrated toolkit which enables assembly and interrogation/visualisation of existing geological information; capture of, and integration with, new data and geological interpretations; and delivery of 3D digital products and services. From its early days as a system which used PocketGIS run on Husky Fex21 hardware, to the present day system which runs on ruggedized tablet PCs with integrated GPS units, the system has evolved into a complete digital mapping and compilation system. BGS•SIGMA2012 uses a highly customised version of ESRI's ArcGIS 10 and 10.1 with a fully relational Access 2007/2010 geodatabase. BGS•SIGMA2012 is the third external release of our award-winning digital field mapping toolkit. The first free external release of the award-winning digital field mapping toolkit was in 2009, with the third version (BGS-SIGMAmobile2012 v1.01) released on our website (http://www.bgs.ac.uk/research/sigma/home.html) in 2013. The BGS•SIGMAmobile toolkit formed the major part of the first two releases but this new version integrates the BGS•SIGMAdesktop functionality that BGS routinely uses to transform our field data into corporate standard geological models and derivative map outputs. BGS•SIGMA2012 is the default toolkit within BGS for bedrock and superficial geological mapping and other data acquisition projects across the UK, both onshore and offshore. It is used in mapping projects in Africa, the Middle East and the USA, and has been taken to Japan as part of the Tohoku tsunami damage assessment project. It is also successfully being used worldwide by other geological surveys e.g. Norway and Tanzania; by universities including Leicester, Keele and Kyoto, and by organisations such as Vale Mining in Brazil and the Montana Bureau of Mines and Geology. It is used globally, with over 2000 licenses downloaded worldwide to date and in use on all seven continents. Development of the system is still ongoing as a result of both user feedback and the changing face of technology. Investigations into the development of a BGS•SIGMA smartphone app are currently taking place alongside system developments such as a new and more streamlined data entry system.

  19. Live Virtual Constructive Distributed Test Environment Characterization Report

    NASA Technical Reports Server (NTRS)

    Murphy, Jim; Kim, Sam K.

    2013-01-01

    This report documents message latencies observed over various Live, Virtual, Constructive, (LVC) simulation environment configurations designed to emulate possible system architectures for the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project integrated tests. For each configuration, four scenarios with progressively increasing air traffic loads were used to determine system throughput and bandwidth impacts on message latency.

  20. Project CLIMB.

    ERIC Educational Resources Information Center

    DeLucca, Adolph

    1982-01-01

    As a state and national model for a basic skills curriculum for Kindergarten through grade 12 students, Coordination Learning Integration--Middlesex Basics (Project CLIMB) is described. The unified system was developed by teachers with administrative support to accomodate all students' reading and mathematics needs. Project CLIMB's development and…

  1. Technology Investments in the NASA Entry Systems Modeling Project

    NASA Technical Reports Server (NTRS)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  2. ECAS Phase I fuel cell results. [Energy Conservation Alternatives Study

    NASA Technical Reports Server (NTRS)

    Warshay, M.

    1978-01-01

    This paper summarizes and discusses the fuel cell system results of Phase I of the Energy Conversion Alternatives Study (ECAS). Ten advanced electric powerplant systems for central-station baseload generation using coal were studied by NASA in ECAS. Three types of low-temperature fuel cells (solid polymer electrolyte, SPE, aqueous alkaline, and phosphoric acid) and two types of high-temperature fuel cells (molten carbonate, MC, and zirconia solid electrolyte, SE) were studied. The results indicate that (1) overall efficiency increases with fuel cell temperature, and (2) scale-up in powerplant size can produce a significant reduction in cost of electricity (COE) only when it is accompanied by utilization of waste fuel cell heat through a steam bottoming cycle and/or integration with a gasifier. For low-temperature fuel cell systems, the use of hydrogen results in the highest efficiency and lowest COE. In spite of higher efficiencies, because of higher fuel cell replacement costs integrated SE systems have higher projected COEs than do integrated MC systems. Present data indicate that life can be projected to over 30,000 hr for MC fuel cells, but data are not yet sufficient for similarly projecting SE fuel cell life expectancy.

  3. The Habitat Demonstration Unit System Integration

    NASA Technical Reports Server (NTRS)

    Gill, Tracy R.; Kennedy, Kriss J.; Tri, Terry O.; Howe, Alan S.

    2010-01-01

    The Lunar Surface System Habitat Demonstration Unit (HDU) will require a project team to integrate a variety of contributions from National Aeronautics and Space Administration (NASA) centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the first version of the HDU, the Pressurized Excursion Module (PEM), from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Laboratory, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into HDU PEM are planned to facilitate the integration process. A coordinated effort to establish simplified Computer Aided Design (CAD) standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU design to maximize the efficiency of both integration and field operations.

  4. An integrated ball projection technology for the study of dynamic interceptive actions.

    PubMed

    Stone, J A; Panchuk, D; Davids, K; North, J S; Fairweather, I; Maynard, I W

    2014-12-01

    Dynamic interceptive actions, such as catching or hitting a ball, are important task vehicles for investigating the complex relationship between cognition, perception, and action in performance environments. Representative experimental designs have become more important recently, highlighting the need for research methods to ensure that the coupling of information and movement is faithfully maintained. However, retaining representative design while ensuring systematic control of experimental variables is challenging, due to the traditional tendency to employ methods that typically involve use of reductionist motor responses such as buttonpressing or micromovements. Here, we outline the methodology behind a custom-built, integrated ball projection technology that allows images of advanced visual information to be synchronized with ball projection. This integrated technology supports the controlled presentation of visual information to participants while they perform dynamic interceptive actions. We discuss theoretical ideas behind the integration of hardware and software, along with practical issues resolved in technological design, and emphasize how the system can be integrated with emerging developments such as mixed reality environments. We conclude by considering future developments and applications of the integrated projection technology for research in human movement behaviors.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tichenor, Daniel A.; Ray-Chaudhuri, Avijit K.; Replogle, William C.

    The Engineering Test Stand (ETS) is a developmental lithography tool designed to demonstrate full-field EUV imaging and provide data for commercial-tool development. In the first phase of integration, currently in progress, the ETS is configured using a developmental projection system, while fabrication of an improved projection system proceeds in parallel. The optics in the second projection system have been fabricated to tighter specifications for improved resolution and reduced flare. The projection system is a 4-mirror, 4x-reduction, ring-field design having a numeral aperture of 0.1, which supports 70 nm resolution at a k{sub 1} of 0.52. The illuminator produces 13.4 nmmore » radiation from a laser-produced plasma, directs the radiation onto an arc-shaped field of view, and provides an effective fill factor at the pupil plane of 0.7. The ETS is designed for full-field images in step-and-scan mode using vacuum-compatible, magnetically levitated, scanning stages. This paper describes system performance observed during the first phase of integration, including static resist images of 100 nm isolated and dense features.« less

  6. Self-Regulated Learning Substudy: Systems Thinking and Curriculum Innovation (STACI) Project.

    ERIC Educational Resources Information Center

    Mandinach, Ellen B.

    The Systems Thinking and Curriculum Innovation (STACI) Project is a multi-year research effort intended to examine the cognitive demands and consequences of learning from a systems thinking approach to instruction and from using simulation-modeling software. The purpose of the study is to test the potentials and effects of integrating the systems…

  7. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    answer that question by examining the technical, infrastructure, economic, and policy barriers to greater intra-hour, inter-hour, seasonal, and inter-annual variability of solar resources-essential information powerful tool that provides essential information to policymakers, financiers, project developers, and

  8. MULTIMEDIA INTEGRATED MODELING FOR ENVIRONMENTAL PROTECTION: INTRODUCTION TO A COLLABORATIVE FRAMEWORK

    EPA Science Inventory

    The EPA's Office of Research and Development is embarking on a long term project to develop a Multimedia Integrated Modeling System (MIMS). The system will have capabilities to represent the transport and fate of nutrients and chemical stressors over multiple scales. MIMS will ...

  9. TRANSMAP : an integrated, real time environmental monitoring and forecasting system for highways and waterways in RI

    DOT National Transportation Integrated Search

    2001-12-01

    This report summarizes the work accomplished during the second year of a three-year project to develop a state of the art, integrated environmental monitoring and modeling system to provide data and information to support the operation, management, a...

  10. The architecture of enterprise hospital information system.

    PubMed

    Lu, Xudong; Duan, Huilong; Li, Haomin; Zhao, Chenhui; An, Jiye

    2005-01-01

    Because of the complexity of the hospital environment, there exist a lot of medical information systems from different vendors with incompatible structures. In order to establish an enterprise hospital information system, the integration among these heterogeneous systems must be considered. Complete integration should cover three aspects: data integration, function integration and workflow integration. However most of the previous design of architecture did not accomplish such a complete integration. This article offers an architecture design of the enterprise hospital information system based on the concept of digital neural network system in hospital. It covers all three aspects of integration, and eventually achieves the target of one virtual data center with Enterprise Viewer for users of different roles. The initial implementation of the architecture in the 5-year Digital Hospital Project in Huzhou Central hospital of Zhejiang Province is also described.

  11. Expanding AirSTAR Capability for Flight Research in an Existing Avionics Design

    NASA Technical Reports Server (NTRS)

    Laughter, Sean A.

    2012-01-01

    The NASA Airborne Subscale Transport Aircraft Research (AirSTAR) project is an Unmanned Aerial Systems (UAS) test bed for experimental flight control laws and vehicle dynamics research. During its development, the test bed has gone through a number of system permutations, each meant to add functionality to the concept of operations of the system. This enabled the build-up of not only the system itself, but also the support infrastructure and processes necessary to support flight operations. These permutations were grouped into project phases and the move from Phase-III to Phase-IV was marked by a significant increase in research capability and necessary safety systems due to the integration of an Internal Pilot into the control system chain already established for the External Pilot. The major system changes in Phase-IV operations necessitated a new safety and failsafe system to properly integrate both the Internal and External Pilots and to meet acceptable project safety margins. This work involved retrofitting an existing data system into the evolved concept of operations. Moving from the first Phase-IV aircraft to the dynamically scaled aircraft further involved restructuring the system to better guard against electromagnetic interference (EMI), and the entire avionics wiring harness was redesigned in order to facilitate better maintenance and access to onboard electronics. This retrofit and harness re-design will be explored and how it integrates with the evolved Phase-IV operations.

  12. Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

    NASA Technical Reports Server (NTRS)

    Valkov, Steffi B.; Sternberg, Daniel; Marston, Michael

    2018-01-01

    The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries.

  13. Project Integration Architecture as a Foundation for Autonomous Solution Systems: The Postulation of a Meaningful "SolveYourself" Method

    NASA Technical Reports Server (NTRS)

    Jones, William Henry

    2005-01-01

    The Project Integration Architecture (PIA) uses object-oriented technology to implement self-revelation and semantic infusion through class derivation. That is, the kind of an object can be discovered through program inquiry and the well-known, well-defined meaning of that object can be utilized as a result of that discovery. This technology has already been demonstrated by the PIA effort in its parameter object classes. It is proposed that, by building on this technology, an autonomous, automatic, goal-seeking, solution system may be devised.

  14. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    DOT National Transportation Integrated Search

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  15. Integrated Modeling Environment

    NASA Technical Reports Server (NTRS)

    Mosier, Gary; Stone, Paul; Holtery, Christopher

    2006-01-01

    The Integrated Modeling Environment (IME) is a software system that establishes a centralized Web-based interface for integrating people (who may be geographically dispersed), processes, and data involved in a common engineering project. The IME includes software tools for life-cycle management, configuration management, visualization, and collaboration.

  16. Spectral integration in primary auditory cortex attributable to temporally precise convergence of thalamocortical and intracortical input.

    PubMed

    Happel, Max F K; Jeschke, Marcus; Ohl, Frank W

    2010-08-18

    Primary sensory cortex integrates sensory information from afferent feedforward thalamocortical projection systems and convergent intracortical microcircuits. Both input systems have been demonstrated to provide different aspects of sensory information. Here we have used high-density recordings of laminar current source density (CSD) distributions in primary auditory cortex of Mongolian gerbils in combination with pharmacological silencing of cortical activity and analysis of the residual CSD, to dissociate the feedforward thalamocortical contribution and the intracortical contribution to spectral integration. We found a temporally highly precise integration of both types of inputs when the stimulation frequency was in close spectral neighborhood of the best frequency of the measurement site, in which the overlap between both inputs is maximal. Local intracortical connections provide both directly feedforward excitatory and modulatory input from adjacent cortical sites, which determine how concurrent afferent inputs are integrated. Through separate excitatory horizontal projections, terminating in cortical layers II/III, information about stimulus energy in greater spectral distance is provided even over long cortical distances. These projections effectively broaden spectral tuning width. Based on these data, we suggest a mechanism of spectral integration in primary auditory cortex that is based on temporally precise interactions of afferent thalamocortical inputs and different short- and long-range intracortical networks. The proposed conceptual framework allows integration of different and partly controversial anatomical and physiological models of spectral integration in the literature.

  17. Use of the adult attachment projective picture system in psychodynamic psychotherapy with a severely traumatized patient

    PubMed Central

    George, Carol; Buchheim, Anna

    2014-01-01

    The following case study is presented to facilitate an understanding of how the attachment information evident from Adult Attachment Projective Picture System (AAP) assessment can be integrated into a psychodynamic perspective in making therapeutic recommendations that integrate an attachment perspective. The Adult Attachment Projective Picture System (AAP) is a valid representational measure of internal representations of attachment based on the analysis of a set of free response picture stimuli designed to systematically activate the attachment system (George and West, 2012). The AAP provides a fruitful diagnostic tool for psychodynamic-oriented clinicians to identify attachment-based deficits and resources for an individual patient in therapy. This paper considers the use of the AAP with a traumatized patient in an inpatient setting and uses a case study to illustrate the components of the AAP that are particularly relevant to a psychodynamic conceptualization. The paper discusses also attachment-based recommendations for intervention. PMID:25140164

  18. [Modularization by the open standard. (I)].

    PubMed

    Hirano, H

    2000-10-01

    We are proceeding with the project called "Open LA21 Project" in the course of the clinical laboratory automation toward the 21st century. With the modular system that realizes integration, downsizing, a reasonable price, and is the future course in the clinical testing automation system as well, we aim to establish common standards among manufacturers as the only way to create user friendly market environments where the proper competition exists among the manufacturers. The common standards which are in preparation by the participating companies as "Open module system standards" are the standards which are going to be made public. They are intended to guarantee connection, compatibility of the products in conformity with the standards. In this project, we intend to realize the modular system that integrates each field, such as chemistry, hematology, coagulation/fibrinolysis, immunology, urinalysis in an early stage, and contribute positively to restructuring and upgrading the "raison d'etre" of the 21st century clinical testing.

  19. Propulsion and Cryogenics Advanced Development (PCAD) Project Propulsion Technologies for the Lunar Lander

    NASA Technical Reports Server (NTRS)

    Klem, Mark D.; Smith, Timothy D.

    2008-01-01

    The Propulsion and Cryogenics Advanced Development (PCAD) Project in the Exploration Technology Development Program is developing technologies as risk mitigation for Orion and the Lunar Lander. An integrated main and reaction control propulsion system has been identified as a candidate for the Lunar Lander Ascent Module. The propellants used in this integrated system are Liquid Oxygen (LOX)/Liquid Methane (LCH4) propellants. A deep throttle pump fed Liquid Oxygen (LOX)/Liquid Hydrogen (LH2) engine system has been identified for the Lunar Lander Descent Vehicle. The propellant combination and architecture of these propulsion systems are novel and would require risk reduction prior to detailed design and development. The PCAD Project addresses the technology requirements to obtain relevant and necessary test data to further the technology maturity of propulsion hardware utilizing these propellants. This plan and achievements to date will be presented.

  20. From generic pathways to ICT-supported horizontally integrated care: the SmartCare approach and convergence with future Internet assembly.

    PubMed

    Urošević, Vladimir; Mitić, Marko

    2014-01-01

    Successful service integration in policy and practice requires both technology innovation and service process innovation being pursued and implemented at the same time. The SmartCare project (partially EC-funded under CIP ICT PSP Program) aims to achieve this through development, piloting and evaluation of ICT-based services, horizontally integrating health and social care in ten pilot regions, including Kraljevo region in Serbia. The project has identified and adopted two generic highest-level common thematic pathways in joint consolidation phase - integrated support for long-term care and integrated support after hospital discharge. A common set of standard functional specifications for an open ICT platform enabling the delivery of integrated care is being defined, around the challenges of data sharing, coordination and communication in these two formalized pathways. Implementation and system integration on technology and architecture level are to be based on open standards, multivendor interoperability, and leveraging on the current evolving open specification technology foundations developed in relevant projects across the European Research Area.

  1. Geospatial Technologies: Real Projects in Real Classrooms

    ERIC Educational Resources Information Center

    Kolvoord, Bob

    2008-01-01

    Geospatial technologies of geographic information systems, global positioning systems, and remote sensing are just a few of the projects that evoke an unexpected drive and devotion from high school students in Virginia. Their integration into different curricular areas lets students focus on understanding their community and the many issues that…

  2. NASA's UAS Integration into the NAS: A Report on the Human Systems Integration Phase 1 Simulation Activities

    NASA Technical Reports Server (NTRS)

    Fern, Lisa; Rorie, R. Conrad; Shively, R. Jay

    2014-01-01

    In 2011 the National Aeronautics and Space Administration (NASA) began a five-year Project to address the technical barriers related to routine access of Unmanned Aerial Systems (UAS) in the National Airspace System (NAS). Planned in two phases, the goal of the first phase was to lay the foundations for the Project by identifying those barriers and key issues to be addressed to achieve integration. Phase 1 activities were completed two years into the five-year Project. The purpose of this paper is to review activities within the Human Systems Integration (HSI) subproject in Phase 1 toward its two objectives: 1) develop GCS guidelines for routine UAS access to the NAS, and 2) develop a prototype display suite within an existing Ground Control Station (GCS). The first objective directly addresses a critical barrier for UAS integration into the NAS - a lack of GCS design standards or requirements. First, the paper describes the initial development of a prototype GCS display suite and supporting simulation software capabilities. Then, three simulation experiments utilizing this simulation architecture are summarized. The first experiment sought to determine a baseline performance of UAS pilots operating in civil airspace under current instrument flight rules for manned aircraft. The second experiment examined the effect of currently employed UAS contingency procedures on Air Traffic Control (ATC) participants. The third experiment compared three GCS command and control interfaces on UAS pilot response times in compliance with ATC clearances. The authors discuss how the results of these and future simulation and flight-testing activities contribute to the development of GCS guidelines to support the safe integration of UAS into the NAS. Finally, the planned activities for Phase 2, including an integrated human-in-the-loop simulation and two flight tests are briefly described.

  3. Advanced Ground Systems Maintenance Enterprise Architecture Project

    NASA Technical Reports Server (NTRS)

    Perotti, Jose M. (Compiler)

    2015-01-01

    The project implements an architecture for delivery of integrated health management capabilities for the 21st Century launch complex. The delivered capabilities include anomaly detection, fault isolation, prognostics and physics based diagnostics.

  4. MISPS: Module integrated solar position sensor for concentration photovoltaics

    NASA Astrophysics Data System (ADS)

    Pardell, Ricard

    2012-10-01

    This paper describes a new device, the MISPS (Module Integrated. Solar Position Sensor) for CPV systems. Its main innovation lies in it being module integrated, so that the sensor is a constituent part of the module and uses its optics. The MISPS has been designed within the scope of the CPVRS project, but it can be used in any refractive optics CPV system.

  5. Mars Reconnaissance Orbiter Mission: Systems Engineering Challenges on the Mars Reconnaissance Orbiter Mission

    NASA Technical Reports Server (NTRS)

    Havens, Glen G.

    2007-01-01

    MRO project is a system of systems requiring system engineering team to architect, design, integrate, test, and operate these systems at each level of the project. The challenge of system engineering mission objectives into a single mission architecture that can be integrated tested, launched, and operated. Systems engineering must translate high-level requirements into integrated mission design. Systems engineering challenges were overcome utilizing a combination by creative designs built into MRO's flight and ground systems: a) Design of sophisticated spacecraft targeting and data management capabilities b) Establishment of a strong operations team organization; c) Implementation of robust operational processes; and d) Development of strategic ground tools. The MRO system has met the challenge of its driving requirements: a) MRO began its two-year primary science phase on November 7, 2006, and by July 2007, met it minimum requirement to collect 15 Tbits of data after only eight months of operations. Currently we have collected 22 Tbits. b) Based on current performance, mission data return could return 70 Tbits of data by the end of the primary science phase in 2008.

  6. A Systems-Based Approach To Integrated Nutrient Management in Narragansett Bay and Its Watershed.

    EPA Science Inventory

    EPA’s Office of Research and Development is embarking on a project to develop and demonstrate a systems-based management approach that will achieve more integrated and effective management of nutrients in southern New England. The geographic focus of this multi-year research proj...

  7. A Systems-Based Approach to Integrated Nutrient Management in Narragansett Bay and its Watershed

    EPA Science Inventory

    EPA’s Office of Research and Development is embarking on a project to develop and demonstrate a systems-based management approach that will achieve more integrated and effective management of nutrients in southern New England. The geographic focus of this multi-year research proj...

  8. Integrated vehicle-based safety systems (IVBSS) : human factors and driver-vehicle interface (DVI) summary report

    DOT National Transportation Integrated Search

    2008-02-01

    The IVBSS program is a four-year, two-phase project to design and evaluate an integrated crash warning system for forward collision, lateral drift, lane-change merge, and curve speed warnings for both light vehicles and heavy trucks. This report, cov...

  9. Neuman systems model-based research: an integrative review project.

    PubMed

    Fawcett, J; Giangrande, S K

    2001-07-01

    The project integrated Neuman systems model-based research literature. Two hundred published studies were located. This article is limited to the 59 full journal articles and 3 book chapters identified. A total of 37% focused on prevention interventions; 21% on perception of stressors; and 10% on stressor reactions. Only 50% of the reports explicitly linked the model with the study variables, and 61% did not include conclusions regarding model utility or credibility. No programs of research were identified. Academic courses and continuing education workshops are needed to help researchers design programs of Neuman systems model-based research and better explicate linkages between the model and the research.

  10. Automated simulation as part of a design workstation

    NASA Technical Reports Server (NTRS)

    Cantwell, Elizabeth; Shenk, T.; Robinson, P.; Upadhye, R.

    1990-01-01

    A development project for a design workstation for advanced life-support systems (called the DAWN Project, for Design Assistant Workstation), incorporating qualitative simulation, required the implementation of a useful qualitative simulation capability and the integration of qualitative and quantitative simulation such that simulation capabilities are maximized without duplication. The reason is that to produce design solutions to a system goal, the behavior of the system in both a steady and perturbed state must be represented. The Qualitative Simulation Tool (QST), on an expert-system-like model building and simulation interface toll called ScratchPad (SP), and on the integration of QST and SP with more conventional, commercially available simulation packages now being applied in the evaluation of life-support system processes and components are discussed.

  11. Computerizing an integrated clinical and financial record system in a CMHC: a pilot project.

    PubMed

    Newkham, J; Bawcom, L

    1981-01-01

    The authors describe the three-year experience of a mid-sized community mental health center in designing and installing an automated Staff/Management Information System (S/MIS). The purpose of the project, piloted at the heart od Texas Region Mental Health Mental Retardation Center (HOTRMHMR) in Waco, Texas, was to examine the feasibility of a comprehensive data system operating at a local level which would create an effective audit trail for services and reimbursement and serve as a viable mechanism for the transmission of center data to a state system via computer tapes. Included in the discussion are agency philosophy, costs, management attitudes, the design and implementation process, and special features which evolved from the fully integrated system.

  12. Study of noise propagation and the effects of insufficient numbers of projection angles and detector samplings for iterative reconstruction using planar-integral data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, B.; Zeng, G. L.

    2006-09-15

    A rotating slat collimator can be used to acquire planar-integral data. It achieves higher geometric efficiency than a parallel-hole collimator by accepting more photons, but the planar-integral data contain less tomographic information that may result in larger noise amplification in the reconstruction. Lodge evaluated the rotating slat system and the parallel-hole system based on noise behavior for an FBP reconstruction. Here, we evaluate the noise propagation properties of the two collimation systems for iterative reconstruction. We extend Huesman's noise propagation analysis of the line-integral system to the planar-integral case, and show that approximately 2.0(D/dp) SPECT angles, 2.5(D/dp) self-spinning angles atmore » each detector position, and a 0.5dp detector sampling interval are required in order for the planar-integral data to be efficiently utilized. Here, D is the diameter of the object and dp is the linear dimension of the voxels that subdivide the object. The noise propagation behaviors of the two systems are then compared based on a least-square reconstruction using the ratio of the SNR in the image reconstructed using a planar-integral system to that reconstructed using a line-integral system. The ratio is found to be proportional to {radical}(F/D), where F is a geometric efficiency factor. This result has been verified by computer simulations. It confirms that for an iterative reconstruction, the noise tradeoff of the two systems is not only dependent on the increase of the geometric efficiency afforded by the planar projection method, but also dependent on the size of the object. The planar-integral system works better for small objects, while the line-integral system performs better for large ones. This result is consistent with Lodge's results based on the FBP method.« less

  13. The Thalamocortical Projection Systems in Primate: An Anatomical Support for Multisensory and Sensorimotor Interplay

    PubMed Central

    Cappe, Céline; Morel, Anne; Barone, Pascal

    2009-01-01

    Multisensory and sensorimotor integrations are usually considered to occur in superior colliculus and cerebral cortex, but few studies proposed the thalamus as being involved in these integrative processes. We investigated whether the organization of the thalamocortical (TC) systems for different modalities partly overlap, representing an anatomical support for multisensory and sensorimotor interplay in thalamus. In 2 macaque monkeys, 6 neuroanatomical tracers were injected in the rostral and caudal auditory cortex, posterior parietal cortex (PE/PEa in area 5), and dorsal and ventral premotor cortical areas (PMd, PMv), demonstrating the existence of overlapping territories of thalamic projections to areas of different modalities (sensory and motor). TC projections, distinct from the ones arising from specific unimodal sensory nuclei, were observed from motor thalamus to PE/PEa or auditory cortex and from sensory thalamus to PMd/PMv. The central lateral nucleus and the mediodorsal nucleus project to all injected areas, but the most significant overlap across modalities was found in the medial pulvinar nucleus. The present results demonstrate the presence of thalamic territories integrating different sensory modalities with motor attributes. Based on the divergent/convergent pattern of TC and corticothalamic projections, 4 distinct mechanisms of multisensory and sensorimotor interplay are proposed. PMID:19150924

  14. Twinning European and South Asian river basins to enhance capacity and implement adaptive integrated water resources management approaches - results from the EC-project BRAHMATWINN

    NASA Astrophysics Data System (ADS)

    Flügel, W.-A.

    2011-04-01

    The EC-project BRAHMATWINN was carrying out a harmonised integrated water resources management (IWRM) approach as addressed by the European Water Initiative (EWI) in headwater river systems of alpine mountain massifs of the twinning Upper Danube River Basin (UDRB) and the Upper Brahmaputra River Basins (UBRB) in Europe and Southeast Asia respectively. Social and natural scientists in cooperation with water law experts and local stakeholders produced the project outcomes presented in Chapter 2 till Chapter 10 of this publication. BRAHMATWINN applied a holistic approach towards IWRM comprising climate modelling, socio-economic and governance analysis and concepts together with methods and integrated tools of applied Geoinformatics. A detailed description of the deliverables produced by the BRAHMATWINN project is published on the project homepage http://www.brahmatwinn.uni-jena.de.

  15. Fatality analysis reporting system and roadway inventory correlation.

    DOT National Transportation Integrated Search

    2013-01-01

    In this project, we developed an integrated database to provide new analysis capabilities : for discovering correlations between roadway characteristics and the occurrence of : fatality collisions. Specifically, the aim of this data analysis project ...

  16. UAS Integration in the NAS Project and Future Autonomy Research

    NASA Technical Reports Server (NTRS)

    Johnson, Charles W.

    2014-01-01

    This presentation highlights NASA use of unmanned aircraft systems (UAS) and related technologies for civil purposes. This briefing will give more insight into the UAS projects progress and future goals.

  17. US-75 ICM system as-built design : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2015-05-01

    This As-Built document for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US Department of Transportation Integrated Corridor Management Initiative. The basic premise behind the ICM initiative is that indepen...

  18. Aspects of Synthetic Vision Display Systems and the Best Practices of the NASA's SVS Project

    NASA Technical Reports Server (NTRS)

    Bailey, Randall E.; Kramer, Lynda J.; Jones, Denise R.; Young, Steven D.; Arthur, Jarvis J.; Prinzel, Lawrence J.; Glaab, Louis J.; Harrah, Steven D.; Parrish, Russell V.

    2008-01-01

    NASA s Synthetic Vision Systems (SVS) Project conducted research aimed at eliminating visibility-induced errors and low visibility conditions as causal factors in civil aircraft accidents while enabling the operational benefits of clear day flight operations regardless of actual outside visibility. SVS takes advantage of many enabling technologies to achieve this capability including, for example, the Global Positioning System (GPS), data links, radar, imaging sensors, geospatial databases, advanced display media and three dimensional video graphics processors. Integration of these technologies to achieve the SVS concept provides pilots with high-integrity information that improves situational awareness with respect to terrain, obstacles, traffic, and flight path. This paper attempts to emphasize the system aspects of SVS - true systems, rather than just terrain on a flight display - and to document from an historical viewpoint many of the best practices that evolved during the SVS Project from the perspective of some of the NASA researchers most heavily involved in its execution. The Integrated SVS Concepts are envisagements of what production-grade Synthetic Vision systems might, or perhaps should, be in order to provide the desired functional capabilities that eliminate low visibility as a causal factor to accidents and enable clear-day operational benefits regardless of visibility conditions.

  19. Case Studies in Application of System Engineering Practices to Capstone Projects

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  20. Overview of ERA Integrated Technology Demonstration (ITD) 51A Ultra-High Bypass (UHB) Integration for Hybrid Wing Body (HWB)

    NASA Technical Reports Server (NTRS)

    Flamm, Jeffrey D.; James, Kevin D.; Bonet, John T.

    2016-01-01

    The NASA Environmentally Responsible Aircraft Project (ERA) was a ve year project broken into two phases. In phase II, high N+2 Technical Readiness Level demonstrations were grouped into Integrated Technology Demonstrations (ITD). This paper describes the work done on ITD-51A: the Vehicle Systems Integration, Engine Airframe Integration Demonstration. Refinement of a Hybrid Wing Body (HWB) aircraft from the possible candidates developed in ERA Phase I was continued. Scaled powered, and unpowered wind- tunnel testing, with and without acoustics, in the NASA LARC 14- by 22-foot Subsonic Tunnel, the NASA ARC Unitary Plan Wind Tunnel, and the 40- by 80-foot test section of the National Full-Scale Aerodynamics Complex (NFAC) in conjunction with very closely coupled Computational Fluid Dynamics was used to demonstrate the fuel burn and acoustic milestone targets of the ERA Project.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magee, Thoman

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), batterymore » storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG. The SGDP enables the efficient, flexible integration of these disparate resources and lays the architectural foundations for future scalability. Con Edison assembled an SGDP team of more than 16 different project partners, including technology vendors, and participating organizations, and the Con Edison team provided overall guidance and project management. Project team members are listed in Table 1-1.« less

  2. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wade, F. E.

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for themore » chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.« less

  3. The CELSS breadboard project: Plant production

    NASA Technical Reports Server (NTRS)

    Knott, William M.

    1990-01-01

    NASA's Breadboard Project for the Controlled Ecological Life Support System (CELSS) program is described. The simplified schematic of a CELSS is given. A modular approach is taken to building the CELSS Breadboard. Each module is researched in order to develop a data set for each one prior to its integration into the complete system. The data being obtained from the Biomass Production Module or the Biomass Production Chamber is examined. The other primary modules, food processing and resource recovery or waste management, are discussed briefly. The crew habitat module is not discussed. The primary goal of the Breadboard Project is to scale-up research data to an integrated system capable of supporting one person in order to establish feasibility for the development and operation of a CELSS. Breadboard is NASA's first attempt at developing a large scale CELSS.

  4. Digital Radiography and Computed Tomography Project -- Fully Integrated Linear Detector ArrayStatus Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Roney; Robert Seifert; Bob Pink

    2011-09-01

    The field-portable Digital Radiography and Computed Tomography (DRCT) x-ray inspection systems developed for the Project Manager for NonStockpile Chemical Materiel (PMNSCM) over the past 13 years have used linear diode detector arrays from two manufacturers; Thomson and Thales. These two manufacturers no longer produce this type of detector. In the interest of insuring the long term viability of the portable DRCT single munitions inspection systems and to improve the imaging capabilities, this project has been investigating improved, commercially available detectors. During FY-10, detectors were evaluated and one in particular, manufactured by Detection Technologies (DT), Inc, was acquired for possible integrationmore » into the DRCT systems. The remainder of this report describes the work performed in FY-11 to complete evaluations and fully integrate the detector onto a representative DRCT platform.« less

  5. Viewing-zone control of integral imaging display using a directional projection and elemental image resizing method.

    PubMed

    Alam, Md Ashraful; Piao, Mei-Lan; Bang, Le Thanh; Kim, Nam

    2013-10-01

    Viewing-zone control of integral imaging (II) displays using a directional projection and elemental image (EI) resizing method is proposed. Directional projection of EIs with the same size of microlens pitch causes an EI mismatch at the EI plane. In this method, EIs are generated computationally using a newly introduced algorithm: the directional elemental image generation and resizing algorithm considering the directional projection geometry of each pixel as well as an EI resizing method to prevent the EI mismatch. Generated EIs are projected as a collimated projection beam with a predefined directional angle, either horizontally or vertically. The proposed II display system allows reconstruction of a 3D image within a predefined viewing zone that is determined by the directional projection angle.

  6. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  7. Integration of mental health into primary care and community health working in Kenya: context, rationale, coverage and sustainability.

    PubMed

    Jenkins, Rachel; Kiima, David; Okonji, Marx; Njenga, Frank; Kingora, James; Lock, Sarah

    2010-03-01

    Integration of mental health into primary care is essential to meet population needs yet faces many challenges if such projects are to achieve impact and be sustainable in low income countries alongside other competing priorities. This paper describes the rationale and progress of a collaborative project in Kenya to train primary care and community health workers about mental health and integrate mental health into their routine work, Within a health systems strengthening approach. So far 1877 health workers have been trained. The paper describes the multiple challenges faced by the project, and reviews the mechanisms deployed which have strengthened its impact and sustainability to date.

  8. Projective Identification in Common Couple Dances.

    ERIC Educational Resources Information Center

    Middelberg, Carol V.

    2001-01-01

    Integrates the object relations concept of projective identification and the systemic concept of marital dances to develop a more powerful model for working with more difficult and distressed couples. Suggests how object relations techniques can be used to interrupt projective identifications and resolve conflict on intrapsychic level so the…

  9. Advanced traveler information system (ATIS) implementation and integration : final report

    DOT National Transportation Integrated Search

    2006-10-01

    The ATIS project was a $1.3 million effort sponsored by the Federal Highway Administration and the New York State Department of Transportation. The project began in March, 2003 and completed in May, 2007. The goal of the project was to create a real-...

  10. The Project-Approach to GIS as an Integrative Classroom Technology: An Environmental Case Study.

    ERIC Educational Resources Information Center

    Gatrell, Jay D.; Oshiro, Kenji K.

    2001-01-01

    Explains how Geographic Information Systems (GIS) influences geography curricula and how project-based learning can be applied to GIS experiences. Introduces a project investigating non-geography college students' design and implementation of a environmental GIS application. (Contains 16 references.) (YDS)

  11. Energy-Water System Solutions | Energy Analysis | NREL

    Science.gov Websites

    simultaneously. Example Projects Energy, water, and renewable opportunities assessment at Bagram Air Force Base opportunity to plan integrated infrastructure. Example Projects Identification of critical water and campus-level opportunities. Example Projects Net Zero Energy-Water-Waste analysis for Fort Carson Net

  12. Adaptivity and Autonomy Development in a Learning Personalization Process

    ERIC Educational Resources Information Center

    Verpoorten, D.

    2009-01-01

    Within the iClass (Integrated Project 507922) and Enhanced Learning Experience and Knowledge Transfer (ELEKTRA; Specific Targeted Research or Innovation Project 027986) European projects, the author was requested to harness his pedagogical knowledge to the production of educational adaptive systems. The article identifies and documents the…

  13. Solar hot water demonstration project at Red Star Industrial Laundry, Fresno, California

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The performance of a Solar Hot Water System at a laundry in Fresno, California is described. The system features an integrated wastewater heat recovery subsystem and a solar preheating system designed to supply a part of the hot water requirements. Performance data for a six month period are projected to an annual savings of $18,703.

  14. Status, Plans and Initial Results for Ares I Crew Launch Vehicle Aerodynamics

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Hall, Robert M.; Haynes, Davy A.; Pamadi, Bandu N.; Taylor, Terry L.; Seaford, C. Mark

    2008-01-01

    Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Ares Projects Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented. Keywords: Ares I Crew Launch Vehicle, aerodynamics, wind tunnel testing, computational fluid dynamics

  15. Integrated multi-sensor package (IMSP) for unmanned vehicle operations

    NASA Astrophysics Data System (ADS)

    Crow, Eddie C.; Reichard, Karl; Rogan, Chris; Callen, Jeff; Seifert, Elwood

    2007-10-01

    This paper describes recent efforts to develop integrated multi-sensor payloads for small robotic platforms for improved operator situational awareness and ultimately for greater robot autonomy. The focus is on enhancements to perception through integration of electro-optic, acoustic, and other sensors for navigation and inspection. The goals are to provide easier control and operation of the robot through fusion of multiple sensor outputs, to improve interoperability of the sensor payload package across multiple platforms through the use of open standards and architectures, and to reduce integration costs by embedded sensor data processing and fusion within the sensor payload package. The solutions investigated in this project to be discussed include: improved capture, processing and display of sensor data from multiple, non-commensurate sensors; an extensible architecture to support plug and play of integrated sensor packages; built-in health, power and system status monitoring using embedded diagnostics/prognostics; sensor payload integration into standard product forms for optimized size, weight and power; and the use of the open Joint Architecture for Unmanned Systems (JAUS)/ Society of Automotive Engineers (SAE) AS-4 interoperability standard. This project is in its first of three years. This paper will discuss the applicability of each of the solutions in terms of its projected impact to reducing operational time for the robot and teleoperator.

  16. Managing Information On Technical Requirements

    NASA Technical Reports Server (NTRS)

    Mauldin, Lemuel E., III; Hammond, Dana P.

    1993-01-01

    Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

  17. Integrated monitoring and information systems for managing aquatic invasive species in a changing climate.

    PubMed

    Lee, Henry; Reusser, Deborah A; Olden, Julian D; Smith, Scott S; Graham, Jim; Burkett, Virginia; Dukes, Jeffrey S; Piorkowski, Robert J; McPhedran, John

    2008-06-01

    Changes in temperature, precipitation, and other climatic drivers and sea-level rise will affect populations of existing native and non-native aquatic species and the vulnerability of aquatic environments to new invasions. Monitoring surveys provide the foundation for assessing the combined effects of climate change and invasions by providing baseline biotic and environmental conditions, although the utility of a survey depends on whether the results are quantitative or qualitative, and other design considerations. The results from a variety of monitoring programs in the United States are available in integrated biological information systems, although many include only non-native species, not native species. Besides including natives, we suggest these systems could be improved through the development of standardized methods that capture habitat and physiological requirements and link regional and national biological databases into distributed Web portals that allow drawing information from multiple sources. Combining the outputs from these biological information systems with environmental data would allow the development of ecological-niche models that predict the potential distribution or abundance of native and non-native species on the basis of current environmental conditions. Environmental projections from climate models can be used in these niche models to project changes in species distributions or abundances under altered climatic conditions and to identify potential high-risk invaders. There are, however, a number of challenges, such as uncertainties associated with projections from climate and niche models and difficulty in integrating data with different temporal and spatial granularity. Even with these uncertainties, integration of biological and environmental information systems, niche models, and climate projections would improve management of aquatic ecosystems under the dual threats of biotic invasions and climate change.

  18. Searching Lost People with Uavs: the System and Results of the Close-Search Project

    NASA Astrophysics Data System (ADS)

    Molina, P.; Colomina, I.; Vitoria, T.; Silva, P. F.; Skaloud, J.; Kornus, W.; Prades, R.; Aguilera, C.

    2012-07-01

    This paper will introduce the goals, concept and results of the project named CLOSE-SEARCH, which stands for 'Accurate and safe EGNOS-SoL Navigation for UAV-based low-cost Search-And-Rescue (SAR) operations'. The main goal is to integrate a medium-size, helicopter-type Unmanned Aerial Vehicle (UAV), a thermal imaging sensor and an EGNOS-based multi-sensor navigation system, including an Autonomous Integrity Monitoring (AIM) capability, to support search operations in difficult-to-access areas and/or night operations. The focus of the paper is three-fold. Firstly, the operational and technical challenges of the proposed approach are discussed, such as ultra-safe multi-sensor navigation system, the use of combined thermal and optical vision (infrared plus visible) for person recognition and Beyond-Line-Of-Sight communications among others. Secondly, the implementation of the integrity concept for UAV platforms is discussed herein through the AIM approach. Based on the potential of the geodetic quality analysis and on the use of the European EGNOS system as a navigation performance starting point, AIM approaches integrity from the precision standpoint; that is, the derivation of Horizontal and Vertical Protection Levels (HPLs, VPLs) from a realistic precision estimation of the position parameters is performed and compared to predefined Alert Limits (ALs). Finally, some results from the project test campaigns are described to report on particular project achievements. Together with actual Search-and-Rescue teams, the system was operated in realistic, user-chosen test scenarios. In this context, and specially focusing on the EGNOS-based UAV navigation, the AIM capability and also the RGB/thermal imaging subsystem, a summary of the results is presented.

  19. Integrated monitoring and information systems for managing aquatic invasive species in a changing climate

    USGS Publications Warehouse

    Lee, Henry; Reusser, Deborah A.; Olden, Julian D.; Smith, Scott S.; Graham, Jim; Burkett, Virginia; Dukes, Jeffrey S.; Piorkowski, Robert J.; Mcphedran, John

    2008-01-01

    Changes in temperature, precipitation, and other climatic drivers and sea-level rise will affect populations of existing native and non-native aquatic species and the vulnerability of aquatic environments to new invasions. Monitoring surveys provide the foundation for assessing the combined effects of climate change and invasions by providing baseline biotic and environmental conditions, although the utility of a survey depends on whether the results are quantitative or qualitative, and other design considerations. The results from a variety of monitoring programs in the United States are available in integrated biological information systems, although many include only non-native species, not native species. Besides including natives, we suggest these systems could be improved through the development of standardized methods that capture habitat and physiological requirements and link regional and national biological databases into distributed Web portals that allow drawing information from multiple sources. Combining the outputs from these biological information systems with environmental data would allow the development of ecological-niche models that predict the potential distribution or abundance of native and non-native species on the basis of current environmental conditions. Environmental projections from climate models can be used in these niche models to project changes in species distributions or abundances under altered climatic conditions and to identify potential high-risk invaders. There are, however, a number of challenges, such as uncertainties associated with projections from climate and niche models and difficulty in integrating data with different temporal and spatial granularity. Even with these uncertainties, integration of biological and environmental information systems, niche models, and climate projections would improve management of aquatic ecosystems under the dual threats of biotic invasions and climate change

  20. The TAME Project: Towards improvement-oriented software environments

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.; Rombach, H. Dieter

    1988-01-01

    Experience from a dozen years of analyzing software engineering processes and products is summarized as a set of software engineering and measurement principles that argue for software engineering process models that integrate sound planning and analysis into the construction process. In the TAME (Tailoring A Measurement Environment) project at the University of Maryland, such an improvement-oriented software engineering process model was developed that uses the goal/question/metric paradigm to integrate the constructive and analytic aspects of software development. The model provides a mechanism for formalizing the characterization and planning tasks, controlling and improving projects based on quantitative analysis, learning in a deeper and more systematic way about the software process and product, and feeding the appropriate experience back into the current and future projects. The TAME system is an instantiation of the TAME software engineering process model as an ISEE (integrated software engineering environment). The first in a series of TAME system prototypes has been developed. An assessment of experience with this first limited prototype is presented including a reassessment of its initial architecture.

  1. Integrated nuclear data utilisation system for innovative reactors.

    PubMed

    Yamano, N; Hasegawa, A; Kato, K; Igashira, M

    2005-01-01

    A five-year research and development project on an integrated nuclear data utilisation system was initiated in 2002, for developing innovative nuclear energy systems such as accelerator-driven systems. The integrated nuclear data utilisation system will be constructed as a modular code system, which consists of two sub-systems: the nuclear data search and plotting sub-system, and the nuclear data processing and utilisation sub-system. The system will be operated with a graphical user interface in order to enable easy utilisation through the Internet by both nuclear design engineers and nuclear data evaluators. This paper presents an overview of the integrated nuclear data utilisation system, describes the development of a prototype system to examine the operability of the user interface and discusses specifications of the two sub-systems.

  2. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2015-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  3. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2014-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  4. Mixed-Dimensionality VLSI-Type Configurable Tools for Virtual Prototyping of Biomicrofluidic Devices and Integrated Systems

    NASA Astrophysics Data System (ADS)

    Makhijani, Vinod B.; Przekwas, Andrzej J.

    2002-10-01

    This report presents results of a DARPA/MTO Composite CAD Project aimed to develop a comprehensive microsystem CAD environment, CFD-ACE+ Multiphysics, for bio and microfluidic devices and complete microsystems. The project began in July 1998, and was a three-year team effort between CFD Research Corporation, California Institute of Technology (CalTech), University of California, Berkeley (UCB), and Tanner Research, with Mr. Don Verlee from Abbott Labs participating as a consultant on the project. The overall objective of this project was to develop, validate and demonstrate several applications of a user-configurable VLSI-type mixed-dimensionality software tool for design of biomicrofluidics devices and integrated systems. The developed tool would provide high fidelity 3-D multiphysics modeling capability, l-D fluidic circuits modeling, and SPICE interface for system level simulations, and mixed-dimensionality design. It would combine tools for layouts and process fabrication, geometric modeling, and automated grid generation, and interfaces to EDA tools (e.g. Cadence) and MCAD tools (e.g. ProE).

  5. Integrated Global Observation Strategy - Ozone and Atmospheric Chemistry Project

    NASA Technical Reports Server (NTRS)

    Hilsenrath, Ernest; Readings, C. J.; Kaye, J.; Mohnen, V.; Einaudi, Franco (Technical Monitor)

    2000-01-01

    The "Long Term Continuity of Stratospheric Ozone Measurements and Atmospheric Chemistry" project was one of six established by the Committee on Earth Observing Satellites (CEOS) in response to the Integrated Global Observing Strategy (IGOS) initiative. IGOS links satellite and ground based systems for global environmental observations. The strategy of this project is to develop a consensus of user requirements including the scientific (SPARC, IGAC, WCRP) and the applications community (WMO, UNEP) and to develop a long-term international plan for ozone and atmospheric chemistry measurements. The major components of the observing system include operational and research (meeting certain criteria) satellite platforms planned by the space faring nations which are integrated with a well supported and sustained ground, aircraft, and balloon measurements program for directed observations as well satellite validation. Highly integrated and continuous measurements of ozone, validation, and reanalysis efforts are essential to meet the international scientific and applications goals. In order to understand ozone trends, climate change, and air quality, it is essential to conduct long term measurements of certain other atmospheric species. These species include key source, radical, and reservoir constituents.

  6. Airspace Systems Program: Next Generation Air Transportation System, NextGen Systems Analysis, Integration and Evaluation Project. Version 1.0; Project Plan

    NASA Technical Reports Server (NTRS)

    Quon, Leighton

    2010-01-01

    The key objectives of the NASA ASP are to: Improve mobility, capacity efficiency and access of the airspace system. Improve collaboration, predictability, and flexibility for the airspace users. Enable accurate modeling and simulation of air transportation systems. Accommodate operations of all classes of aircraft. Maintain system safety and environmental protection. In support of these program objectives, the major goal of the NextGen-SAIE Project is to enable the transition of key capacity and efficiency improvements to the NAS. Since many aspects of the NAS are unique to specific airport or airspace environments, demand on various parts of the NAS is not expected to increase equally as system demand grows. SAIE will provide systems level analysis of the NAS characteristics, constraints, and demands such that a suite of capacity-increasing concepts and technologies for system solutions are enabled and facilitated. The technical objectives in support of this goal are the following: Integration, evaluation, and transition of more mature concepts and technologies in an environment that faithfully emulates real-world complexities. Interoperability research and analysis of ASP technologies across ATM functions is performed to facilitate integration and take ASP concepts and technologies to higher Technology Readiness Level (TRL). Analyses are conducted on the program s concepts to identify the system benefits or impacts. System level analysis is conducted to increase understanding of the characteristics and constraints of airspace system and its domains.

  7. Suit study - The impact of VMS in subsystem integration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hill, B.; Watts, R.

    1992-02-01

    One of the thrusts of the Wright Laboratory/FIVE-sponsored Subsystem Integration Technology (SUIT) study is to investigate the impact of emerging vehicle management system (VMS) concepts on subsystem integration. This paper summarizes the issues relating to VMS/subsystem integration as examined during the Northrop SUIT study. Projected future weapon system requirements are identified and their impact on VMS and subsystem design interpreted. Integrated VMS/subsystem control and management functions are proposed. A candidate system VMS architecture satisfying the aforementioned weapon system requirements and providing the identified control and management functions is proposed. This architecture is used, together with the environmental control system, asmore » an illustrative subsystem example, to address the risks associated with the design, development, procurement, integration and testing of integrated VMS/subsystem concepts. The conclusion is that the development process requires an airframer to adopt the role of subsystem integrator, the consequences of which are discussed. 2 refs.« less

  8. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT SEISMIC ANALYSIS IN SUPPORT OF INCREASED LIQUID LEVEL IN 241-AP TANK FARMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MACKEY TC; ABBOTT FG; CARPENTER BG

    2007-02-16

    The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST System at Hanford. The "Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project" is in support of Tri-Party Agreement Milestone M-48-14.

  9. Data integration in the era of omics: current and future challenges

    PubMed Central

    2014-01-01

    To integrate heterogeneous and large omics data constitutes not only a conceptual challenge but a practical hurdle in the daily analysis of omics data. With the rise of novel omics technologies and through large-scale consortia projects, biological systems are being further investigated at an unprecedented scale generating heterogeneous and often large data sets. These data-sets encourage researchers to develop novel data integration methodologies. In this introduction we review the definition and characterize current efforts on data integration in the life sciences. We have used a web-survey to assess current research projects on data-integration to tap into the views, needs and challenges as currently perceived by parts of the research community. PMID:25032990

  10. Exploration Life Support Critical Questions for Future Human Space Missions

    NASA Technical Reports Server (NTRS)

    Ewert, Michael K.; Barta, Daniel J.; McQuillan, Jeff

    2009-01-01

    Exploration Life Support (ELS) is a project under NASA s Exploration Technology Development Program. The ELS Project plans, coordinates and implements the development of advanced life support technologies for human exploration missions in space. Recent work has focused on closed loop atmosphere and water systems for a lunar outpost, including habitats and pressurized rovers. But, what are the critical questions facing life support system developers for these and other future human missions? This paper explores those questions and discusses how progress in the development of ELS technologies can help answer them. The ELS Project includes Atmosphere Revitalization Systems (ARS), Water Recovery Systems (WRS), Waste Management Systems (WMS), Habitation Engineering, Systems Integration, Modeling and Analysis (SIMA), and Validation and Testing, which includes the sub-elements Flight Experiments and Integrated Testing. Systems engineering analysis by ELS seeks to optimize the overall mission architecture by considering all the internal and external interfaces of the life support system and the potential for reduction or reuse of commodities. In particular, various sources and sinks of water and oxygen are considered along with the implications on loop closure and the resulting launch mass requirements.

  11. Systems Integration Fact Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-06-01

    This fact sheet is an overview of the Systems Integration subprogram at the U.S. Department of Energy SunShot Initiative. The Systems Integration subprogram enables the widespread deployment of safe, reliable, and cost-effective solar energy technologies by addressing the associated technical and non-technical challenges. These include timely and cost-effective interconnection procedures, optimal system planning, accurate prediction of solar resources, monitoring and control of solar power, maintaining grid reliability and stability, and many more. To address the challenges associated with interconnecting and integrating hundreds of gigawatts of solar power onto the electricity grid, the Systems Integration program funds research, development, and demonstrationmore » projects in four broad, interrelated focus areas: grid performance and reliability, dispatchability, power electronics, and communications.« less

  12. Current systematic carbon-cycle observations and the need for implementing a policy-relevant carbon observing system

    Treesearch

    P. Ciais; A. J. Dolman; A. Bombelli; R. Duren; A. Peregon; P. J. Rayner; C. Miller; N. Gobron; G. Kinderman; G. Marland; N. Gruber; F. Chevallier; R. J. Andres; G. Balsamo; L. Bopp; F.-M. Bréon; G. Broquet; R. Dargaville; T. J. Battin; A. Borges; H. Bovensmann; M. Buchwitz; J. Butler; J. G. Canadell; R. B. Cook; R. DeFries; R. Engelen; K. R. Gurney; C. Heinze; M. Heimann; A. Held; M. Henry; B. Law; S. Luyssaert; J. Miller; T. Moriyama; C. Moulin; R. B. Myneni; C. Nussli; M. Obersteiner; D. Ojima; Y. Pan; J.-D. Paris; S. L. Piao; B. Poulter; S. Plummer; S. Quegan; P. Raymond; M. Reichstein; L. Rivier; C. Sabine; D. Schimel; O. Tarasova; R. Valentini; R. Wang; G. van der Werf; D. Wickland; M. Williams; C. Zehner

    2014-01-01

    A globally integrated carbon observation and analysis system is needed to improve the fundamental understanding of the global carbon cycle, to improve our ability to project future changes, and to verify the effectiveness of policies aiming to reduce greenhouse gas emissions and increase carbon sequestration. Building an integrated carbon observation system requires...

  13. Laser projection positioning of spatial contour curves via a galvanometric scanner

    NASA Astrophysics Data System (ADS)

    Tu, Junchao; Zhang, Liyan

    2018-04-01

    The technology of laser projection positioning is widely applied in advanced manufacturing fields (e.g. composite plying, parts location and installation). In order to use it better, a laser projection positioning (LPP) system is designed and implemented. Firstly, the LPP system is built by a laser galvanometric scanning (LGS) system and a binocular vision system. Applying Single-hidden Layer Feed-forward Neural Network (SLFN), the system model is constructed next. Secondly, the LGS system and the binocular system, which are respectively independent, are integrated through a datadriven calibration method based on extreme learning machine (ELM) algorithm. Finally, a projection positioning method is proposed within the framework of the calibrated SLFN system model. A well-designed experiment is conducted to verify the viability and effectiveness of the proposed system. In addition, the accuracy of projection positioning are evaluated to show that the LPP system can achieves the good localization effect.

  14. Integrated Test Approach

    NASA Technical Reports Server (NTRS)

    Cotton, Will; Liechty, John

    2015-01-01

    This paper describes a testing methodology undertaken on the Facilities Development and Operations Contract (FDOC) by Lockheed Martin. The methodology was defined with the intent of reducing project schedule time to enable NASA's Johnson Space Center (JSC) to be able to deliver the Mission Control Center (MCC) 21 project as quickly as possible. 21 represents the 21st century where NASA JSC is updating its control center with new technology and operational concepts in order to support NASA customers wanting to use control center assets to support space vehicle operations. In collaboration with the NASA customer, a new test concept was conceived early during MCC21 project planning with the goal of reducing project delivery time. One enabler that could help reduce delivery time was testing. Within the project, testing was performed by two entities, software development responsible for subsystem testing and system test responsible for system integration testing. The MCC21 project took a deliberate review of testing to determine how it could be performed differently to realize an overall reduction in test time to support the goal of a more rapid project delivery.

  15. M/A-COM linkabit eastern operations

    NASA Astrophysics Data System (ADS)

    Mills, D. L.; Avramovic, Z.

    1983-03-01

    This first Quarterly Project Report on LINKABIT's contribution to the Defense Advanced Research Projects Agency (DARPA) Internet Program covers the period from 22 December 1982 through 21 March 1983. LINKABIT's support of the Internet Program is concentrated in the areas of protocol design, implementation, testing, and evaluation. In addition, LINKABIT staff are providing integration and support services for certain computer systems to be installed at DARPA sites in Washington, D.C., and Stuttgart, West Germany. During the period covered by this report, LINKABIT organized the project activities and established staff responsibilities. Several computers and peripheral devices were made available from Government sources for use in protocol development and network testing. Considerable time was devoted to installing this equipment, integrating the software, and testing it with the Internet system.

  16. Aircraft Engine Technology for Green Aviation to Reduce Fuel Burn

    NASA Technical Reports Server (NTRS)

    Hughes, Christopher E.; VanZante, Dale E.; Heidmann, James D.

    2013-01-01

    The NASA Fundamental Aeronautics Program Subsonic Fixed Wing Project and Integrated Systems Research Program Environmentally Responsible Aviation Project in the Aeronautics Research Mission Directorate are conducting research on advanced aircraft technology to address the environmental goals of reducing fuel burn, noise and NOx emissions for aircraft in 2020 and beyond. Both Projects, in collaborative partnerships with U.S. Industry, Academia, and other Government Agencies, have made significant progress toward reaching the N+2 (2020) and N+3 (beyond 2025) installed fuel burn goals by fundamental aircraft engine technology development, subscale component experimental investigations, full scale integrated systems validation testing, and development validation of state of the art computation design and analysis codes. Specific areas of propulsion technology research are discussed and progress to date.

  17. Development of Advanced Czochralski Growth Process to produce low cost 150 KG silicon ingots from a single crucible for technology readiness

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The modified CG2000 crystal grower construction, installation, and machine check-out was completed. The process development check-out proceeded with several dry runs and one growth run. Several machine calibrations and functional problems were discovered and corrected. Several exhaust gas analysis system alternatives were evaluated and an integrated system approved and ordered. A contract presentation was made at the Project Integration Meeting at JPL, including cost-projections using contract projected throughput and machine parameters. Several growth runs on a development CG200 RC grower show that complete neck, crown, and body automated growth can be achieved with only one operator input. Work continued for melt level, melt temperature, and diameter sensor development.

  18. Multi-Element Integrated Project Planning at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Mullon, Robert

    2008-01-01

    This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

  19. Social Ecological Model Analysis for ICT Integration

    ERIC Educational Resources Information Center

    Zagami, Jason

    2013-01-01

    ICT integration of teacher preparation programmes was undertaken by the Australian Teaching Teachers for the Future (TTF) project in all 39 Australian teacher education institutions and highlighted the need for guidelines to inform systemic ICT integration approaches. A Social Ecological Model (SEM) was used to positively inform integration…

  20. Project ITCH: Interactive Digital Simulation in Electrical Engineering Education.

    ERIC Educational Resources Information Center

    Bailey, F. N.; Kain, R. Y.

    A two-stage project is investigating the educational potential of a low-cost time-sharing system used as a simulation tool in Electrical Engineering (EE) education. Phase I involves a pilot study and Phase II a full integration. The system employs interactive computer simulation to teach engineering concepts which are not well handled by…

  1. Special Analysis of Migrant Education Even Start Data. Even Start Information System.

    ERIC Educational Resources Information Center

    Tao, Fumiyo; Arriola, Christine

    This report analyzes data submitted by 11 of 14 state Migrant Education Even Start (MEES) projects operating in 1994-95. These projects provide migrant families with an integrated program of early childhood education, adult education, and parenting education. The data were drawn from the Even Start Information System (ESIS), which collected…

  2. Integrating Soft Skill Competencies through Project-Based Learning across the Information Systems Curriculum

    ERIC Educational Resources Information Center

    Woodward, Belle S.; Sendall, Patricia; Ceccucci, Wendy

    2010-01-01

    Contemporary Information Systems graduates will be more marketable in the workplace upon graduation if they have combined competencies in both technical and soft skills: interpersonal communication, teamwork, time management, planning and organizational skills. Team and project-based learning can be used to incorporate soft skill competencies with…

  3. Computerized adaptive control weld skate with CCTV weld guidance project

    NASA Technical Reports Server (NTRS)

    Wall, W. A.

    1976-01-01

    This report summarizes progress of the automatic computerized weld skate development portion of the Computerized Weld Skate with Closed Circuit Television (CCTV) Arc Guidance Project. The main goal of the project is to develop an automatic welding skate demonstration model equipped with CCTV weld guidance. The three main goals of the overall project are to: (1) develop a demonstration model computerized weld skate system, (2) develop a demonstration model automatic CCTV guidance system, and (3) integrate the two systems into a demonstration model of computerized weld skate with CCTV weld guidance for welding contoured parts.

  4. Towards an integrated EU data system within AtlantOS project

    NASA Astrophysics Data System (ADS)

    Pouliquen, Sylvie; Harscoat, Valerie; Waldmann, Christoph; Koop-Jakobsen, ketill

    2017-04-01

    The H2020 AtlantOS project started in June 2015 and aims to optimise and enhance the Integrated Atlantic Ocean Observing Systems (IAOOS). One goal is to ensure that data from different and diverse in-situ observing networks are readily accessible and useable to the wider community, international ocean science community and other stakeholders in this field. To achieve that, the strategy is to move towards an integrated data system within AtlantOS that harmonises work flows, data processing and distribution across the in-situ observing network systems, and integrates in-situ observations in existing European and international data infrastructures (Copernicus marine service, SeaDataNet NODCs, EMODnet, OBIS, GEOSS) so called Integrators. The targeted integrated system will deal with data management challenges for efficient and reliable data service to users: • Quality control commons for heterogeneous and nearly real time data • Standardisation of mandatory metadata for efficient data exchange • Interoperability of network and integrator data management systems Presently the situation is that the data acquired by the different in situ observing networks contributing to the AtlantOS project are processed and distributed using different methodologies and means. Depending on the network data management organization, the data are either processed following recommendations elaborated y the network teams and accessible through a unique portal (FTP or Web), or are processed by individual scientific researchers and made available through National Data Centres or directly at institution level. Some datasets are available through Integrators, such as Copernicus or EMODnet, but connected through ad-hoc links. To facilitate the access to the Atlantic observations and avoid "mixing pears with apples", it has been necessary to agree on (1) the EOVs list and definition across the Networks, (2) a minimum set of common vocabularies for metadata and data description to be used by all the Networks, and (3) a minimum level of Near Real Time Quality Control Procedures for selected EOVs. Then a data exchange backbone has been defined and is being setting up to facilitate discovery, viewing and downloading by the users. Some tools will be recommended to help Network plugging their data on this backbone and facilitate integration in the Integrators. Finally, existing services to the users for data discovery, viewing and downloading will be enhanced to ease access to existing observations. An initial working phase relying on existing international standards and protocols, involving data providers, both Networks and Integrators, and dealing with data harmonisation and integration objectives, has led to agreements and recommendations .The setup phase has started, both on Networks and Integrators sides, to adapt the existing systems in order to move toward this integrated EU data system within AtlantOS as well as collaboration with international partners arpound the ATlantic Ocean.

  5. Integrated learning of mathematics, science and technology concepts through LEGO/Logo projects

    NASA Astrophysics Data System (ADS)

    Wu, Lina

    This dissertation examined integrated learning in the domains of mathematics, science and technology based on Piaget's constructivism, Papert's constructionism, and project-based approach to education. Ten fifth grade students were involved in a two-month long after school program where they designed and built their own computer-controlled LEGO/Logo projects that required the use of gears, ratios and motion concepts. The design of this study centered on three notions of integrated learning: (1) integration in terms of what educational materials/settings provide, (2) integration in terms of students' use of those materials, and (3) integration in the psychological sense. In terms of the first notion, the results generally showed that the LEGO/Logo environment supported the integrated learning of math, science and technology concepts. Regarding the second notion, the students all completed impressive projects of their own design. They successfully combined gears, motors, and LEGO parts together to create motion and writing control commands to manipulate the motion. But contrary to my initial expectations, their successful designs did not require numerical reasoning about ratios in designing effective gear systems. When they did reason about gear relationships, they worked with "qualitative" ratios, e.g., "a larger driver gear with a smaller driven gear increases the speed." In terms of the third notion of integrated learning, there was evidence in all four case study students of the psychological processes involved in linking mathematical, scientific, and/or technological concepts together to achieve new conceptual units. The students not only made connections between ideas and experiences, but also recognized decisive patterns and relationships in their project work. The students with stronger overall project performances showed more evidence of synthesis than the students with relatively weaker performances did. The findings support the conclusion that all three notions of the integrated learning are important for understanding what the students learned from their project work. By considering these notions together, and by deliberating about their interrelations, we take a step towards understanding the integrated learning.

  6. Full-parallax 3D display from stereo-hybrid 3D camera system

    NASA Astrophysics Data System (ADS)

    Hong, Seokmin; Ansari, Amir; Saavedra, Genaro; Martinez-Corral, Manuel

    2018-04-01

    In this paper, we propose an innovative approach for the production of the microimages ready to display onto an integral-imaging monitor. Our main contribution is using a stereo-hybrid 3D camera system, which is used for picking up a 3D data pair and composing a denser point cloud. However, there is an intrinsic difficulty in the fact that hybrid sensors have dissimilarities and therefore should be equalized. Handled data facilitate to generating an integral image after projecting computationally the information through a virtual pinhole array. We illustrate this procedure with some imaging experiments that provide microimages with enhanced quality. After projection of such microimages onto the integral-imaging monitor, 3D images are produced with great parallax and viewing angle.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mohamed Abdelrahman; roger Haggard; Wagdy Mahmoud

    The final goal of this project was the development of a system that is capable of controlling an industrial process effectively through the integration of information obtained through intelligent sensor fusion and intelligent control technologies. The industry of interest in this project was the metal casting industry as represented by cupola iron-melting furnaces. However, the developed technology is of generic type and hence applicable to several other industries. The system was divided into the following four major interacting components: 1. An object oriented generic architecture to integrate the developed software and hardware components @. Generic algorithms for intelligent signal analysismore » and sensor and model fusion 3. Development of supervisory structure for integration of intelligent sensor fusion data into the controller 4. Hardware implementation of intelligent signal analysis and fusion algorithms« less

  8. Integrated system design report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-07-01

    The primary objective of the integrated system test phase is to demonstrate the commercial potential of a coal fueled diesel engine in its actual operating environment. The integrated system in this project is defined as a coal fueled diesel locomotive. This locomotive, shown on drawing 41D715542, is described in the separate Concept Design Report. The test locomotive will be converted from an existing oil fueled diesel locomotive in three stages, until it nearly emulates the concept locomotive. Design drawings of locomotive components (diesel engine, locomotive, flatcar, etc.) are included.

  9. ENFIN a network to enhance integrative systems biology.

    PubMed

    Kahlem, Pascal; Birney, Ewan

    2007-12-01

    Integration of biological data of various types and development of adapted bioinformatics tools represent critical objectives to enable research at the systems level. The European Network of Excellence ENFIN is engaged in developing both an adapted infrastructure to connect databases and platforms to enable the generation of new bioinformatics tools as well as the experimental validation of computational predictions. We will give an overview of the projects tackled within ENFIN and discuss the challenges associated with integration for systems biology.

  10. Hardware Specific Integration Strategy for Impedance-Based Structural Health Monitoring of Aerospace Systems

    NASA Technical Reports Server (NTRS)

    Owen, Robert B.; Gyekenyesi, Andrew L.; Inman, Daniel J.; Ha, Dong S.

    2011-01-01

    The Integrated Vehicle Health Management (IVHM) Project, sponsored by NASA's Aeronautics Research Mission Directorate, is conducting research to advance the state of highly integrated and complex flight-critical health management technologies and systems. An effective IVHM system requires Structural Health Monitoring (SHM). The impedance method is one such SHM technique for detection and monitoring complex structures for damage. This position paper on the impedance method presents the current state of the art, future directions, applications and possible flight test demonstrations.

  11. Implementing an integrated engineering data base system: A developer's experience and the application to IPAD

    NASA Technical Reports Server (NTRS)

    Bruce, E. A.

    1980-01-01

    The software developed by the IPAD project, a new and very powerful tool for the implementation of integrated Computer Aided Design (CAD) systems in the aerospace engineering community, is discussed. The IPAD software is a tool and, as such, can be well applied or misapplied in any particular environment. The many benefits of an integrated CAD system are well documented, but there are few such systems in existence, especially in the mechanical engineering disciplines, and therefore little available experience to guide the implementor.

  12. Nuclear Hybrid Energy Systems Initial Integrated Case Study Development and Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Thomas J.; Greenwood, Michael Scott

    The US Department of Energy Office of Nuclear Energy established the Nuclear Hybrid Energy System (NHES) project to develop a systematic, rigorous, technically accurate set of methods to model, analyze, and optimize the integration of dispatchable nuclear, fossil, and electric storage with an industrial customer. Ideally, the optimized integration of these systems will provide economic and operational benefits to the overall system compared to independent operation, and it will enhance the stability and responsiveness of the grid as intermittent, nondispatchable, renewable resources provide a greater share of grid power.

  13. IT Project Success w\\7120 and 7123 NPRs to Achieve Project Success

    NASA Technical Reports Server (NTRS)

    Walley, Tina L.

    2009-01-01

    This slide presentation reviews management techniques to assure information technology development project success. Details include the work products, the work breakdown structure (WBS), system integration, verification and validation (IV&V), and deployment and operations. An example, the NASA Consolidated Active Directory (NCAD), is reviewed.

  14. Connecticut Biodiesel Power Generation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grannis, Lee; York, Carla R.

    Sabre will continue support of the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection to become more automated. Final project reports for data collection and system performance to be generated. Sabre continued to support the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection became more automated. Final project reports for data collection and system performance were generated and are part of this final report. Some Systems Sensors were replaced due to a lightning strike.more » Sample data charts are shown at the end of the report. During the project, Sabre Engineering provided support to the project team with regarding to troubleshooting technical issues and system integration with the local power utility company. The resulting lessons learned through Sabre’s participation in the project have been valuable to the integrity of the data collected as well as in providing BioPur Light & Power valuable insights into future operations and planning for possible expansion. The system monitoring and data collection system has been operating as designed and continues to provide relevant information to the system operators. The information routinely gathered automatically by the system also contributes to the REN and REC validations which are required to secure credit for these items. During the quarter, the remaining work on the operations and safety manual were completed and released for publication after screen shots were verified. The goal of this effort to provide an accurate set of precautions and procedures for the technology system that can be replicated to other similar system.« less

  15. Cradle Enhanced UI Development

    NASA Technical Reports Server (NTRS)

    Jentsch, Samuel

    2016-01-01

    This summer I have been working in the EDI (Exploration, Development, and Integration) office. The primary goal of my office is to facilitate the integration, cooperation, and communication between programs, projects and departments throughout the agency. The majority of my efforts has been focused on Cradle, a requirements management and systems engineering tool. This tool is utilized by teams throughout NASA to plan and track the development of a variety of ongoing projects.

  16. Region and database management for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Data Integration 2000 Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf product solution with commercially proven business processes. The COTS product solution set, of PassPort and People Soft software, supports finance, supply and chemical management/Material Safety Data Sheet, human resources.

  17. Vehicle Integrated Propulsion Research Tests

    NASA Technical Reports Server (NTRS)

    Lekki, John D.; Hunter, Gary W.; Simon, Don; Meredith, Roger; Wrbanek, John; Woike, Mark; Tokars, Roger; Guffanti, Marianne; Lyall, Eric

    2013-01-01

    Overview of the Vehicle Integrated Propulsion Research Tests in the Vehicle Systems Safety Technologies project. This overview covers highlights of the completed VIPR I and VIPR II tests and also covers plans for the VIPR III test.

  18. ELE: An Ontology-Based System Integrating Semantic Search and E-Learning Technologies

    ERIC Educational Resources Information Center

    Barbagallo, A.; Formica, A.

    2017-01-01

    ELSE (E-Learning for the Semantic ECM) is an ontology-based system which integrates semantic search methodologies and e-learning technologies. It has been developed within a project of the CME (Continuing Medical Education) program--ECM (Educazione Continua nella Medicina) for Italian participants. ELSE allows the creation of e-learning courses…

  19. NED-2: A decision support system for integrated forest ecosystem management

    Treesearch

    Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; H. Michael Rauscher; Donald E. Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mayukh Dass; Hajime Uchiyama; Astrid Glende; Robin E. Hoffman

    2005-01-01

    NED-2 is a Windows-based system designed to improve project-level planning and decision making by providing useful and scientifically sound information to natural resource managers. Resources currently addressed include visual quality, ecology, forest health, timber, water, and wildlife. NED-2 expands on previous versions of NED applications by integrating treatment...

  20. NED-2: a decision support system for integrated forest ecosystem management

    Treesearch

    Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; H. Michael Rauscher; Donald E. Nute; Walter D. Potter; Frederick Maier; Jin Wang; Mayukh Dass; Hajime Uchiyama; Astrid Glende; Robin E. Hoffman

    2005-01-01

    NED-2 is a Windows-based system designed to improve project-level planning and decision making by providing useful and scientifically sound information to natural resource managers. Resources currently addressed include visual quality, ecology, forest health, timber, water, and wildlife. NED-2 expands on previous versions of NED applications by integrating treatment...

  1. Integration of e-Management, e-Development and e-Learning Technologies for Blended Course Delivery

    ERIC Educational Resources Information Center

    Johnson, Lynn E.; Tang, Michael

    2005-01-01

    This paper describes and assesses a pre-engineering curriculum development project called Foundations of Engineering, Science and Technology (FEST). FEST integrates web-based technologies into an inter-connected system to enable delivery of a blended program at multiple institutions. Tools and systems described include 1) technologies to deliver…

  2. Performance, Process, and Costs: Managing Service Quality with the Balanced Scorecard.

    ERIC Educational Resources Information Center

    Poll, Roswitha

    2001-01-01

    Describes a cooperative project among three German libraries that used the Balanced Scorecard as a concept for an integrated quality management system. Considers performance indicators across four perspectives that will help academic libraries establish an integrated controlling system and to collect and evaluate performance as well as cost data…

  3. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    Grid Modernization Project Informed by ESIF Research The Hawaii Public Utilities Commission approved on (HECO) to upgrade its five island power grids. The plan describes the scope and estimated cost to update the energy networks of Hawaiian Electric, Maui Electric, and Hawaii Electric Light in the next five

  4. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 4 : web-based bridge information database--visualization analytics and distributed sensing.

    DOT National Transportation Integrated Search

    2012-03-01

    This report introduces the design and implementation of a Web-based bridge information visual analytics system. This : project integrates Internet, multiple databases, remote sensing, and other visualization technologies. The result : combines a GIS ...

  5. Discovery Systems

    NASA Technical Reports Server (NTRS)

    Pell, Barney

    2003-01-01

    A viewgraph presentation on NASA's Discovery Systems Project is given. The topics of discussion include: 1) NASA's Computing Information and Communications Technology Program; 2) Discovery Systems Program; and 3) Ideas for Information Integration Using the Web.

  6. Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Haynes, Davy A.; Taylor, Terry L.; Hall, Robert M.; Pamadi, Bandu N.; Seaford, C. Mark

    2006-01-01

    Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.

  7. The Earth System (ES-DOC) Project

    NASA Astrophysics Data System (ADS)

    Greenslade, Mark; Murphy, Sylvia; Treshansky, Allyn; DeLuca, Cecilia; Guilyardi, Eric; Denvil, Sebastien

    2014-05-01

    ESSI1.3 New Paradigms, Modelling, and International Collaboration Strategies for Earth System Sciences Earth System Documentation (ES-DOC) is an international project supplying tools & services in support of earth system documentation creation, analysis and dissemination. It is nurturing a sustainable standards based documentation eco-system that aims to become an integral part of the next generation of exa-scale dataset archives. ES-DOC leverages open source software and places end-user narratives at the heart of all it does. ES-DOC has initially focused upon nurturing the Earth System Model (ESM) documentation eco-system. Within this context ES-DOC leverages emerging documentation standards and supports the following projects: Coupled Model Inter-comparison Project Phase 5 (CMIP5); Dynamical Core Model Inter-comparison Project (DCMIP); National Climate Predictions and Projections Platforms Quantitative Evaluation of Downscaling Workshop. This presentation will introduce the project to a wider audience and demonstrate the range of tools and services currently available for use. It will also demonstrate how international collaborative efforts are essential to the success of ES-DOC.

  8. Output Control Technologies for a Large-scale PV System Considering Impacts on a Power Grid

    NASA Astrophysics Data System (ADS)

    Kuwayama, Akira

    The mega-solar demonstration project named “Verification of Grid Stabilization with Large-scale PV Power Generation systems” had been completed in March 2011 at Wakkanai, the northernmost city of Japan. The major objectives of this project were to evaluate adverse impacts of large-scale PV power generation systems connected to the power grid and develop output control technologies with integrated battery storage system. This paper describes the outline and results of this project. These results show the effectiveness of battery storage system and also proposed output control methods for a large-scale PV system to ensure stable operation of power grids. NEDO, New Energy and Industrial Technology Development Organization of Japan conducted this project and HEPCO, Hokkaido Electric Power Co., Inc managed the overall project.

  9. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    ERIC Educational Resources Information Center

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  10. AtlantOS - Optimizing and Enhancing the Integrated Atlantic Ocean Observing System

    NASA Astrophysics Data System (ADS)

    Reitz, Anja; Visbeck, Martin; AtlantOS Consortium, the

    2016-04-01

    Atlantic Ocean observation is currently undertaken through loosely-coordinated, in-situ observing networks, satellite observations and data management arrangements of heterogeneous international, national and regional design to support science and a wide range of information products. Thus there is tremendous opportunity to develop the systems towards a fully integrated Atlantic Ocean Observing System consistent with the recently developed 'Framework of Ocean Observing'. The vision of AtlantOS is to improve and innovate Atlantic observing by using the Framework of Ocean Observing to obtain an international, more sustainable, more efficient, more integrated, and fit-for-purpose system. Hence, the AtlantOS initiative will have a long-lasting and sustainable contribution to the societal, economic and scientific benefit arising from this integrated approach. This will be delivered by improving the value for money, extent, completeness, quality and ease of access to Atlantic Ocean data required by industries, product supplying agencies, scientist and citizens. The overarching target of the AtlantOS initiative is to deliver an advanced framework for the development of an integrated Atlantic Ocean Observing System that goes beyond the state-of -the-art, and leaves a legacy of sustainability after the life of the project. The legacy will derive from the following aims: i) to improve international collaboration in the design, implementation and benefit sharing of ocean observing, ii) to promote engagement and innovation in all aspects of ocean observing, iii) to facilitate free and open access to ocean data and information, iv) to enable and disseminate methods of achieving quality and authority of ocean information, v) to strengthen the Global Ocean Observing System (GOOS) and to sustain observing systems that are critical for the Copernicus Marine Environment Monitoring Service and its applications and vi) to contribute to the aims of the Galway Statement on Atlantic Ocean Cooperation. The EU Horizon 2020 AtlantOS project pools the efforts of 57 European and 5 non-European partners (research institutes, universities, marine service providers, multi-institutional organisations, and the private sector) from 18 countries to collaborate on optimizing and enhancing Atlantic Ocean observing. The project has a budget of € 21M for 4 years (April 2015 - June 2019) and is coordinated by GEOMAR Helmholtz Centre for Ocean Research Kiel, Germany (Prof. Dr. Martin Visbeck). The project is organized along work packages on: i) observing system requirements and design studies, ii) enhancement of ship-based and autonomous observing networks, iii) interfaces with coastal ocean observing systems, iv) integration of regional observing systems, v) cross-cutting issues and emerging networks, vi) data flow and data integration, vii) societal benefits from observing /information systems, viii) system evaluation and resource sustainability. Engagement with wider stakeholders including end-users of Atlantic Ocean observation products and services will also be key throughout the project. The AtlantOS initiative contributes to achieving the aims of the Galway Statement on Atlantic Ocean Cooperation that was signed in 2013 by the EU, Canada and the US, launching a Transatlantic Ocean Research Alliance to enhance collaboration to better understand the Atlantic Ocean and sustainably manage and use its resources.

  11. Development of a model of machine hand eye coordination and program specifications for a topological machine vision system

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A unified approach to computer vision and manipulation is developed which is called choreographic vision. In the model, objects to be viewed by a projected robot in the Viking missions to Mars are seen as objects to be manipulated within choreographic contexts controlled by a multimoded remote, supervisory control system on Earth. A new theory of context relations is introduced as a basis for choreographic programming languages. A topological vision model is developed for recognizing objects by shape and contour. This model is integrated with a projected vision system consisting of a multiaperture image dissector TV camera and a ranging laser system. System program specifications integrate eye-hand coordination and topological vision functions and an aerospace multiprocessor implementation is described.

  12. Positional Accuracy of Airborne Integrated Global Positioning and Inertial Navigation Systems for Mapping in Glen Canyon, Arizona

    USGS Publications Warehouse

    Sanchez, Richard D.; Hothem, Larry D.

    2002-01-01

    High-resolution airborne and satellite image sensor systems integrated with onboard data collection based on the Global Positioning System (GPS) and inertial navigation systems (INS) may offer a quick and cost-effective way to gather accurate topographic map information without ground control or aerial triangulation. The Applanix Corporation?s Position and Orientation Solutions for Direct Georeferencing of aerial photography was used in this project to examine the positional accuracy of integrated GPS/INS for terrain mapping in Glen Canyon, Arizona. The research application in this study yielded important information on the usefulness and limits of airborne integrated GPS/INS data-capture systems for mapping.

  13. Systems Engineering and Integration for Advanced Life Support System and HST

    NASA Technical Reports Server (NTRS)

    Kamarani, Ali K.

    2005-01-01

    Systems engineering (SE) discipline has revolutionized the way engineers and managers think about solving issues related to design of complex systems: With continued development of state-of-the-art technologies, systems are becoming more complex and therefore, a systematic approach is essential to control and manage their integrated design and development. This complexity is driven from integration issues. In this case, subsystems must interact with one another in order to achieve integration objectives, and also achieve the overall system's required performance. Systems engineering process addresses these issues at multiple levels. It is a technology and management process dedicated to controlling all aspects of system life cycle to assure integration at all levels. The Advanced Integration Matrix (AIM) project serves as the systems engineering and integration function for the Human Support Technology (HST) program. AIM provides means for integrated test facilities and personnel for performance trade studies, analyses, integrated models, test results, and validated requirements of the integration of HST. The goal of AIM is to address systems-level integration issues for exploration missions. It will use an incremental systems integration approach to yield technologies, baselines for further development, and possible breakthrough concepts in the areas of technological and organizational interfaces, total information flow, system wide controls, technical synergism, mission operations protocols and procedures, and human-machine interfaces.

  14. An Assessment of the Philippine Counterinsurgency Operational Methodology

    DTIC Science & Technology

    2005-06-17

    CAFGUs will be recruited from the village that has been cleared. As part of the defense system , Barangay Information Networks (BINs) are established. The...projects by the DSWD. The type of projects include construction of school buildings, farm-to-market roads and irrigation systems , provision of health ...an effective system of coordination and integration of government efforts by the different departments. The Government’s Strategy of Holistic

  15. FAA Loran early implementation project

    DOT National Transportation Integrated Search

    1990-03-01

    The Early Implementation Project (EIP), established by FAA Administrator Admiral : Donald C. Engen, was the initial step in the process of Loran integration into the : National Airsace System (NAS). The EIP was designed to give the FAA and the Loran ...

  16. Integrating Agronomic Principles with Management Experience in Introductory Agronomy.

    ERIC Educational Resources Information Center

    Vorst, J. J.

    1989-01-01

    Explains the use of a cropping systems project to teach agronomic principles and crop management techniques, and to enhance communication skills. Provides a sample progress report instructions sheet which was used for the project. (Author/RT)

  17. An integrated decision support system for TRAC: A proposal

    NASA Technical Reports Server (NTRS)

    Mukkamala, Ravi

    1991-01-01

    Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.

  18. Tailoring Enterprise Systems Engineering Policy for Project Scale and Complexity

    NASA Technical Reports Server (NTRS)

    Cox, Renee I.; Thomas, L. Dale

    2014-01-01

    Space systems are characterized by varying degrees of scale and complexity. Accordingly, cost-effective implementation of systems engineering also varies depending on scale and complexity. Recognizing that systems engineering and integration happen everywhere and at all levels of a given system and that the life cycle is an integrated process necessary to mature a design, the National Aeronautic and Space Administration's (NASA's) Marshall Space Flight Center (MSFC) has developed a suite of customized implementation approaches based on project scale and complexity. While it may be argued that a top-level system engineering process is common to and indeed desirable across an enterprise for all space systems, implementation of that top-level process and the associated products developed as a result differ from system to system. The implementation approaches used for developing a scientific instrument necessarily differ from those used for a space station. .

  19. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    NASA Technical Reports Server (NTRS)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  20. RMS: a platform for managing cross-disciplinary and multi-institutional research project collaboration.

    PubMed

    Luo, Jake; Apperson-Hansen, Carolyn; Pelfrey, Clara M; Zhang, Guo-Qiang

    2014-11-30

    Cross-institutional cross-disciplinary collaboration has become a trend as researchers move toward building more productive and innovative teams for scientific research. Research collaboration is significantly changing the organizational structure and strategies used in the clinical and translational science domain. However, due to the obstacles of diverse administrative structures, differences in area of expertise, and communication barriers, establishing and managing a cross-institutional research project is still a challenging task. We address these challenges by creating an integrated informatics platform to reduce the barriers to biomedical research collaboration. The Request Management System (RMS) is an informatics infrastructure designed to transform a patchwork of expertise and resources into an integrated support network. The RMS facilitates investigators' initiation of new collaborative projects and supports the management of the collaboration process. In RMS, experts and their knowledge areas are categorized and managed structurally to provide consistent service. A role-based collaborative workflow is tightly integrated with domain experts and services to streamline and monitor the life-cycle of a research project. The RMS has so far tracked over 1,500 investigators with over 4,800 tasks. The research network based on the data collected in RMS illustrated that the investigators' collaborative projects increased close to 3 times from 2009 to 2012. Our experience with RMS indicates that the platform reduces barriers for cross-institutional collaboration of biomedical research projects. Building a new generation of infrastructure to enhance cross-disciplinary and multi-institutional collaboration has become an important yet challenging task. In this paper, we share the experience of developing and utilizing a collaborative project management system. The results of this study demonstrate that a web-based integrated informatics platform can facilitate and increase research interactions among investigators.

  1. Envision: An interactive system for the management and visualization of large geophysical data sets

    NASA Technical Reports Server (NTRS)

    Searight, K. R.; Wojtowicz, D. P.; Walsh, J. E.; Pathi, S.; Bowman, K. P.; Wilhelmson, R. B.

    1995-01-01

    Envision is a software project at the University of Illinois and Texas A&M, funded by NASA's Applied Information Systems Research Project. It provides researchers in the geophysical sciences convenient ways to manage, browse, and visualize large observed or model data sets. Envision integrates data management, analysis, and visualization of geophysical data in an interactive environment. It employs commonly used standards in data formats, operating systems, networking, and graphics. It also attempts, wherever possible, to integrate with existing scientific visualization and analysis software. Envision has an easy-to-use graphical interface, distributed process components, and an extensible design. It is a public domain package, freely available to the scientific community.

  2. Intelligent Elements for the ISHM Testbed and Prototypes (ITP) Project

    NASA Technical Reports Server (NTRS)

    Maul, William A.; Park, Han; Schwabacher, Mark; Watson, Michael; Mackey, Ryan; Fijany, Amir; Trevino, Luis; Weir, John

    2005-01-01

    Deep-space manned missions will require advanced automated health assessment capabilities. Requirements such as in-space assembly, long dormant periods and limited accessibility during flight, present significant challenges that should be addressed through Integrated System Health Management (ISHM). The ISHM approach will provide safety and reliability coverage for a complete system over its entire life cycle by determining and integrating health status and performance information from the subsystem and component levels. This paper will focus on the potential advanced diagnostic elements that will provide intelligent assessment of the subsystem health and the planned implementation of these elements in the ISHM Testbed and Prototypes (ITP) Project under the NASA Exploration Systems Research and Technology program.

  3. Integrating a project monitoring system into a public health network: experiences from Alive & Thrive Vietnam.

    PubMed

    Tuan, Nguyen Thanh; Alayon, Silvia; Do, Tran Thanh; Ngan, Tran Thi; Hajeebhoy, Nemat

    2015-01-01

    Little information is available about how to build a monitoring system to measure the output of preventive nutrition interventions, such as counselling on infant and young child feeding. This paper describes the Alive & Thrive Vietnam (A&T) project experience in nesting a large-scale project monitoring system into the existing public health information system (e.g. using the system and resources), and in using monitoring data to strengthen service delivery in 15 provinces with A&T franchises. From January 2012 to April 2014, the 780 A&T franchises provided 1,700,000 counselling contacts (~3/4 by commune franchises). In commune franchises in April 2014, 80% of mothers who were pregnant or with children under two years old had been to the counselling service at least one time, and 87% of clients had been to the service earlier. Monitoring data are used to track the progress of the project, make decisions, provide background for a costing study and advocate for the integration of nutrition counselling indicators into the health information system nationwide. With careful attention to the needs of stakeholders at multiple levels, clear data quality assurance measures and strategic feedback mechanisms, it is feasible to monitor the scale-up of nutrition programmes through the existing routine health information system.

  4. Design of strength characteristics on the example of a mining support

    NASA Astrophysics Data System (ADS)

    Gwiazda, A.; Sękala, A.; Banaś, W.; Topolska, S.; Foit, K.; Monica, Z.

    2017-08-01

    It is a special group of particular design aproches that could be characterized as “design for X”. All areas of specific these design methodology, taking into account the requirements of the life cycle are described with the acronym DfX. It means an integrated computing platform approach to design binding together both the area of design knowledge and area of computer systems. In this perspective, computer systems are responsible for the link between design requirements with the subject of the project and to filter the information being circulated throughout the operation of the project. The DfX methodologies together form an approach integrating to different functional areas of industrial organization. Among the internal elements it can distinguish the structure of the project team, the people making it, the same process design, control system design and implementation of the action tools to assist this process. Among the elements that are obtained in the framework of this approach should be distinguished: higher operating efficiency, professionalism, the ability to create innovation, incremental progress of the project and the appropriate focus of the project team. It have been done attempts to integrate identified specific areas for action in the field of design methodology. They have already taken place earlier in the design due to the Economic Design for Manufacture. This approach was characteristic for European industry. In this case, an approach was developed in methodology, which can be defined as the Design to/for Cost. The article presents the idea of an integrated design approach related with the DfX approach. The results are described on the base of a virtual 3D model of a mining support. This model was elaborated in the advanced engineering platform like Siemens PLM NX.

  5. Engineering Lessons Learned and Systems Engineering Applications

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.

    2005-01-01

    Systems Engineering is fundamental to good engineering, which in turn depends on the integration and application of engineering lessons learned and technical standards. Thus, good Systems Engineering also depends on systems engineering lessons learned from within the aerospace industry being documented and applied. About ten percent of the engineering lessons learned documented in the NASA Lessons Learned Information System are directly related to Systems Engineering. A key issue associated with lessons learned datasets is the communication and incorporation of this information into engineering processes. Systems Engineering has been defined (EINIS-632) as "an interdisciplinary approach encompassing the entire technical effort to evolve and verify an integrated and life-cycle balanced set of system people, product, and process solutions that satisfy customer needs". Designing reliable space-based systems has always been a goal for NASA, and many painful lessons have been learned along the way. One of the continuing functions of a system engineer is to compile development and operations "lessons learned" documents and ensure their integration into future systems development activities. They can produce insights and information for risk identification identification and characterization. on a new project. Lessons learned files from previous projects are especially valuable in risk

  6. Clinical decision support systems at the Vienna General Hospital using Arden Syntax: Design, implementation, and integration.

    PubMed

    Schuh, Christian; de Bruin, Jeroen S; Seeling, Walter

    2015-12-01

    The Allgemeines Krankenhaus Informations Management (AKIM) project was started at the Vienna General Hospital (VGH) several years ago. This led to the introduction of a new hospital information system (HIS), and the installation of the expert system platform (EXP) for the integration of Arden-Syntax-based clinical decision support systems (CDSSs). In this report we take a look at the milestones achieved and the challenges faced in the creation and modification of CDSSs, and their integration into the HIS over the last three years. We introduce a three-stage development method, which is followed in nearly all CDSS projects at the Medical University of Vienna and the VGH. Stage one comprises requirements engineering and system conception. Stage two focuses on the implementation and testing of the system. Finally, stage three describes the deployment and integration of the system in the VGH HIS. The HIS provides a clinical work environment for healthcare specialists using customizable graphical interfaces known as parametric medical documents. Multiple Arden Syntax servers are employed to host and execute the CDSS knowledge bases: two embedded in the EXP for production and development, and a further three in clinical routine for production, development, and quality assurance. Three systems are discussed; the systems serve different purposes in different clinical areas, but are all implemented with Arden Syntax. MONI-ICU is an automated surveillance system for monitoring healthcare-associated infections in the intensive care setting. TSM-CDS is a CDSS used for risk prediction in the formation of cutaneous melanoma metastases. Finally, TacroDS is a CDSS for the manipulation of dosages for tacrolimus, an immunosuppressive agent used after kidney transplantation. Problems in development and integration were related to data quality or availability, although organizational difficulties also caused delays in development and integration. Since the inception of the AKIM project at the VGH and its ability to support standards such as Arden Syntax and integrate CDSSs into clinical routine, the clinicians' interest in, and demand for, decision support has increased substantially. The use of Arden Syntax as a standard for CDSSs played a substantial role in the ability to rapidly create high-quality CDSS systems, whereas the ability to integrate these systems into the HIS made CDSSs more popular among physicians. Despite these successes, challenges such as lack of (consistent and high-quality) electronic data, social acceptance among healthcare personnel, and legislative issues remain. These have to be addressed effectively before CDSSs can be more widely accepted and adopted. Copyright © 2015 Elsevier B.V. All rights reserved.

  7. The Post-Dam System. Volume 5. Harvard Project Manager (HPM).

    DTIC Science & Technology

    1992-10-01

    cQllected and analyzed to determine structural integrity and usability. From this analysis, a repair schedule is developed. This is currently a time...information on mission-critical facility damage is collected and analyzed to determine structural integrity and usability. From this analysis, a repair...to determine repair strategies with an expert system, keep track of materials and equipment with a relational database management system, and

  8. Adaptive Urban Signal Control and Integration (AUSCI) : evaluation final report

    DOT National Transportation Integrated Search

    2000-10-01

    This report presents an evaluation of the Adaptive Urban Signal Control and Integration (AUSCI) Intelligent Transportation System (ITS) Field Operational Test in Minneapolis, Minnesota. The project involved a 56-intersection portion of Minneapolis, e...

  9. Integration of design information

    NASA Technical Reports Server (NTRS)

    Anderton, G. L.

    1980-01-01

    The overall concepts of the integrated programs for aerospace-vehicle design (IPAD) from the user's viewpoint are discussed. Also a top-level view of what the user requires from such a system is provided, and the interactions between the system and user are described. The four major components discussed are design process; data storage, management and manipulation; user interface; and project management. Although an outgrowth of aerospace production experience, the basic concepts discussed, and especially their emphasis on integration, are considered applicable to all problem solving. Thus, these concepts may offer a broad base for exploitation by industry in general. This is the first in a set of three papers, the other two being Future Integrated Design Process, by D. D. Mayer, and Requirements for Company-Wide Management of Engineering Information, by J. W. Southall. In addition to tying the three together, how project management can be handled in a computing environment and also the user interface needs are discussed in detail.

  10. IDESSA: An Integrative Decision Support System for Sustainable Rangeland Management in Southern African Savannas

    NASA Astrophysics Data System (ADS)

    Meyer, Hanna; Authmann, Christian; Dreber, Niels; Hess, Bastian; Kellner, Klaus; Morgenthal, Theunis; Nauss, Thomas; Seeger, Bernhard; Tsvuura, Zivanai; Wiegand, Kerstin

    2017-04-01

    Bush encroachment is a syndrome of land degradation that occurs in many savannas including those of southern Africa. The increase in density, cover or biomass of woody vegetation often has negative effects on a range of ecosystem functions and services, which are hardly reversible. However, despite its importance, neither the causes of bush encroachment, nor the consequences of different resource management strategies to combat or mitigate related shifts in savanna states are fully understood. The project "IDESSA" (An Integrative Decision Support System for Sustainable Rangeland Management in Southern African Savannas) aims to improve the understanding of the complex interplays between land use, climate patterns and vegetation dynamics and to implement an integrative monitoring and decision-support system for the sustainable management of different savanna types. For this purpose, IDESSA follows an innovative approach that integrates local knowledge, botanical surveys, remote-sensing and machine-learning based time-series of atmospheric and land-cover dynamics, spatially explicit simulation modeling and analytical database management. The integration of the heterogeneous data will be implemented in a user oriented database infrastructure and scientific workflow system. Accessible via web-based interfaces, this database and analysis system will allow scientists to manage and analyze monitoring data and scenario computations, as well as allow stakeholders (e. g. land users, policy makers) to retrieve current ecosystem information and seasonal outlooks. We present the concept of the project and show preliminary results of the realization steps towards the integrative savanna management and decision-support system.

  11. Integration of functional safety systems on the Daniel K. Inouye Solar Telescope

    NASA Astrophysics Data System (ADS)

    Williams, Timothy R.; Hubbard, Robert P.; Shimko, Steve

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) was envisioned from an early stage to incorporate a functional safety system to ensure the safety of personnel and equipment within the facility. Early hazard analysis showed the need for a functional safety system. The design used a distributed approach in which each major subsystem contains a PLC-based safety controller. This PLC-based system complies with the latest international standards for functional safety. The use of a programmable controller also allows for flexibility to incorporate changes in the design of subsystems without adversely impacting safety. Various subsystems were built by different contractors and project partners but had to function as a piece of the overall control system. Using distributed controllers allows project contractors and partners to build components as standalone subsystems that then need to be integrated into the overall functional safety system. Recently factory testing was concluded on the major subsystems of the facility. Final integration of these subsystems is currently underway on the site. Building on lessons learned in early factory tests, changes to the interface between subsystems were made to improve the speed and ease of integration of the entire system. Because of the distributed design each subsystem can be brought online as it is delivered and assembled rather than waiting until the entire facility is finished. This enhances safety during the risky period of integration and testing. The DKIST has implemented a functional safety system that has allowed construction of subsystems in geographically diverse locations but that function cohesively once they are integrated into the facility currently under construction.

  12. Overview of the NASA Environmentally Responsible Aviation Project's Propulsion Technology Portfolio

    NASA Technical Reports Server (NTRS)

    Suder, Kenneth L.

    2012-01-01

    The NASA Environmentally Responsible Aviation (ERA) Project is focused on developing and demonstrating integrated systems technologies to TRL 4-6 by 2020 that enable reduced fuel burn, emissions, and noise for futuristic air vehicles. The specific goals aim to simultaneously reduce fuel burn by 50%, reduce Landing and Take-off Nitrous Oxides emissions by 75% relative to the CAEP 6 guidelines, and reduce cumulative noise by 42 Decibels relative to the Stage 4 guidelines. These goals apply to the integrated vehicle and propulsion system and are based on a reference mission of 3000nm flight of a Boeing 777-200 with GE90 engines. This paper will focus primarily on the ERA propulsion technology portfolio, which consists of advanced combustion, propulsor, and core technologies to enable these integrated air vehicle systems goals. An overview of the ERA propulsion technologies will be described and the status and results to date will be presented.

  13. Telematic integration of health data: a practicable contribution.

    PubMed

    Guerriero, Lorenzo; Ferdeghini, Ezio M; Viola, Silvia R; Porro, Ivan; Testi, Angela; Bedini, Remo

    2011-09-01

    The patients' clinical and healthcare data should virtually be available everywhere, both to provide a more efficient and effective medical approach to their pathologies, as well as to make public healthcare decision makers able to verify the efficacy and efficiency of the adopted healthcare processes. Unfortunately, customised solutions adopted by many local Health Information Systems in Italy make it difficult to share the stored data outside their own environment. In the last years, worldwide initiatives have aimed to overcome such sharing limitation. An important issue during the passage towards standardised, integrated information systems is the possible loss of previously collected data. The herein presented project realises a suitable architecture able to guarantee reliable, automatic, user-transparent storing and retrieval of information from both modern and legacy systems. The technical and management solutions provided by the project avoid data loss and overlapping, and allow data integration and organisation suitable for data-mining and data-warehousing analysis.

  14. Multi-Modal Traveler Information System - Corridor User Needs and Data Exchange Elements

    DOT National Transportation Integrated Search

    1997-07-30

    Intended as a resource for the members of the GCM Deployment Committee, : Architecture Communication and Information Work Group, project managers, system : designers, system developers and system integrators, this Working Paper supports : the design,...

  15. Advanced Development Projects for Constellation From The Next Generation Launch Technology Program Elements

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Saiyed, Naseem H.; Swith, Marion Shayne

    2005-01-01

    When United States President George W. Bush announced the Vision for Space Exploration in January 2004, twelve propulsion and launch system projects were being pursued in the Next Generation Launch Technology (NGLT) Program. These projects underwent a review for near-term relevance to the Vision. Subsequently, five projects were chosen as advanced development projects by NASA s Exploration Systems Mission Directorate (ESMD). These five projects were Auxiliary Propulsion, Integrated Powerhead Demonstrator, Propulsion Technology and Integration, Vehicle Subsystems, and Constellation University Institutes. Recently, an NGLT effort in Vehicle Structures was identified as a gap technology that was executed via the Advanced Development Projects Office within ESMD. For all of these advanced development projects, there is an emphasis on producing specific, near-term technical deliverables related to space transportation that constitute a subset of the promised NGLT capabilities. The purpose of this paper is to provide a brief description of the relevancy review process and provide a status of the aforementioned projects. For each project, the background, objectives, significant technical accomplishments, and future plans will be discussed. In contrast to many of the current ESMD activities, these areas are providing hardware and testing to further develop relevant technologies in support of the Vision for Space Exploration.

  16. LERC power system autonomy program 1990 demonstration

    NASA Technical Reports Server (NTRS)

    Faymon, Karl A.; Sundberg, Gale R.; Bercaw, Robert R.; Weeks, David J.

    1987-01-01

    The NASA Lewis Research Center has undertaken a program for the development of space systems automation, with a view to increased reliability, safety, payload capability, and decreased operational costs. The NASA Space Station is a primary area of application for the techniques thus developed. Attention is presently given to the activities associated with the Power Systems Autonomy Demonstration Project, which has a projected demonstration date in 1990 and will integrate knowledge-based systems into a real-time environment. Two coordinated systems under expert system control will be demonstrated.

  17. Data management plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.

  18. Integration of Schemas on the Pre-Design Level Using the KCPM-Approach

    NASA Astrophysics Data System (ADS)

    Vöhringer, Jürgen; Mayr, Heinrich C.

    Integration is a central research and operational issue in information system design and development. It can be conducted on the system, schema, and view or data level. On the system level, integration deals with the progressive linking and testing of system components to merge their functional and technical characteristics and behavior into a comprehensive, interoperable system. Schema integration comprises the comparison and merging of two or more schemas, usually conceptual database schemas. The integration of data deals with merging the contents of multiple sources of related data. View integration is similar to schema integration, however focuses on views and queries on these instead of schemas. All these types of integration have in common, that two or more sources are merged and previously compared, in order to identify matches and mismatches as well as conflicts and inconsistencies. The sources may stem from heterogeneous companies, organizational units or projects. Integration enables the reuse and combined use of source components.

  19. Real World Projects, Real World Problems: Capstones for External Clients

    ERIC Educational Resources Information Center

    Reinicke, Bryan; Janicki, Thomas

    2011-01-01

    Capstones form an important part of the curriculum in many undergraduate and graduate programs in Information Systems. These projects give the students a chance to synthesize and apply the skills they have been acquiring throughout their academic program. These projects can be integrated with another recent initiative in higher education: service…

  20. Teachers' Views on an ICT Reform in Education for Social Justice

    ERIC Educational Resources Information Center

    Tarman, Bülent; Baytak, Ahmet; Duman, Harun

    2015-01-01

    FATIH project (Movement of Enhancing Opportunities and Improving Technology) is an information and communication technologies (ICT) project to promote social justice for all schools in Turkey. The educational movements and reforms in Turkish Educational System (TES) are not new but this project has a purpose to integrate the newest technologies…

  1. Use of intelligent transportation systems in rural work zones.

    DOT National Transportation Integrated Search

    2011-12-01

    This project defined an approach to integrating data collected and traveler information displayed in a work zone : with a regional transportation management center and/or other state websites. The project conducted a literature : review to define the...

  2. Abilene Metropolitan Area Transportation Improvement Program Fiscal Years 1996-1998

    DOT National Transportation Integrated Search

    1995-11-30

    This document contains a prioritized list of surface transportation improvement : projects which are expected to begin in the next three years. These projects are : planned to develop, improve, and maintain an integrated transportation system : for t...

  3. Sensorimotor Integration by Corticospinal System

    PubMed Central

    Moreno-López, Yunuen; Olivares-Moreno, Rafael; Cordero-Erausquin, Matilde; Rojas-Piloni, Gerardo

    2016-01-01

    The corticospinal (CS) tract is a complex system which targets several areas of the spinal cord. In particular, the CS descending projection plays a major role in motor command, which results from direct and indirect control of spinal cord pre-motor interneurons as well as motoneurons. But in addition, this system is also involved in a selective and complex modulation of sensory feedback. Despite recent evidence confirms that CS projections drive distinct segmental neural circuits that are part of the sensory and pre-motor pathways, little is known about the spinal networks engaged by the corticospinal tract (CST), the organization of CS projections, the intracortical microcircuitry, and the synaptic interactions in the sensorimotor cortex (SMC) that may encode different cortical outputs to the spinal cord. Here is stressed the importance of integrated approaches for the study of sensorimotor function of CS system, in order to understand the functional compartmentalization and hierarchical organization of layer 5 output neurons, who are key elements for motor control and hence, of behavior. PMID:27013985

  4. Sensorimotor Integration by Corticospinal System.

    PubMed

    Moreno-López, Yunuen; Olivares-Moreno, Rafael; Cordero-Erausquin, Matilde; Rojas-Piloni, Gerardo

    2016-01-01

    The corticospinal (CS) tract is a complex system which targets several areas of the spinal cord. In particular, the CS descending projection plays a major role in motor command, which results from direct and indirect control of spinal cord pre-motor interneurons as well as motoneurons. But in addition, this system is also involved in a selective and complex modulation of sensory feedback. Despite recent evidence confirms that CS projections drive distinct segmental neural circuits that are part of the sensory and pre-motor pathways, little is known about the spinal networks engaged by the corticospinal tract (CST), the organization of CS projections, the intracortical microcircuitry, and the synaptic interactions in the sensorimotor cortex (SMC) that may encode different cortical outputs to the spinal cord. Here is stressed the importance of integrated approaches for the study of sensorimotor function of CS system, in order to understand the functional compartmentalization and hierarchical organization of layer 5 output neurons, who are key elements for motor control and hence, of behavior.

  5. Advances in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft E.; Johnson, James; Lewis, Hilton A.; Martin, Christopher; McLean, Ian S.; Wizinowich, Peter

    2012-09-01

    In this paper we describe both recently completed instrumentation projects and our current development efforts in terms of their role in the strategic plan, the key science areas they address, and their performance as measured or predicted. Projects reaching completion in 2012 include MOSFIRE, a near IR multi-object spectrograph, a laser guide star adaptive optics facility on the Keck I telescope, and an upgrade to the guide camera for the HIRES instrument on Keck I. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager (KCWI), an upgrade to the telescope control systems on both Keck telescopes, a near-IR tip/tilt sensor for the Keck I adaptive optics system, and a new grating for the OSIRIS integral field spectrograph.

  6. Overview of demonstrator program of Japanese Smart Materials and Structure System project

    NASA Astrophysics Data System (ADS)

    Tajima, Naoyuki; Sakurai, Tateo; Sasajima, Mikio; Takeda, Nobuo; Kishi, Teruo

    2003-08-01

    The Japanese Smart Material and Structure System Project started in 1998 as five years' program that funded by METI (Ministry of Economy, Trade and Industry) and supported by NEDO (New Energy and Industrial Technology Development Organization). Total budget of five years was finally about 3.8 billion Japanese yen. This project has been conducted as the Academic Institutions Centered Program, namely, one of collaborated research and development among seven universities (include one foreign university), seventeen Industries (include two foreign companies), and three national laboratories. At first, this project consisted of four research groups that were structural health monitoring, smart manufacturing, active/adaptive structures, and actuator material/devices. Two years later, we decided that two demonstrator programs should be added in order to integrate the developed sensor and actuator element into the smart structure system and verify the research and development results of above four research groups. The application target of these demonstrators was focused to the airplane, and two demonstrators that these shapes simulate to the fuselage of small commercial airplane (for example, Boeing B737) had been established. Both demonstrators are cylindrical structures with 1.5 m in diameter and 3 m in length that the first demonstrator has CFRP skin-stringer and the second one has CFRP skin. The first demonstrator integrates the following six innovative techniques: (1) impact monitoring using embedded small diameter optical fiber sensors newly developed in this program, (2) impact monitoring using the integrated acoustic emission (AE) systems, (3) whole-field strain mapping using the BOTDR/FBG integrated system, (4) damage suppression using embedded shape memory alloy (SMA) films, (5) maximum and cyclic strain sensing using smart composite patches, and (6) smart manufacturing using the integrated sensing system. The second one is for demonstrating the suppression of vibration and acoustic noise generated in the composite cylindrical structure. In this program, High-performance PZT actuators/sensors developed in this program are also installed. The whole tests and evaluations have now been finished. This paper presents the outline of demonstrator programs, followed by six presentations that show the detail verification results of industrial demonstration themes.

  7. Design, Fabrication, Characterization and Modeling of Integrated Functional Materials

    DTIC Science & Technology

    2015-12-01

    interactions on the magnetization dynamics and hence the EB in these nanostructures. A comprehensive understanding of these effects is essential to...activities is expected to lead to new devices/systems/composite materials useful for the USAMRMC. 15. SUBJECT TERMS Functional materials, integrated...dimensions (nano, micro, meso, macro) leading to integrated functional materials. We have initiated this Integrated Functional Materials Project at the

  8. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    NASA Astrophysics Data System (ADS)

    Bogdanov, A. V.; Iuzhanin, N. V.; Zolotarev, V. I.; Ezhakova, T. R.

    2017-12-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is being reviewed and development of the corresponding elements of the system is being described in the present paper.

  9. Impact of Environment-Based Teaching on Student Achievement: A Study of Washington State Middle Schools

    ERIC Educational Resources Information Center

    Bartosh, Oksana; Tudor, Margaret; Ferguson, Lynne; Taylor, Catherine

    2009-01-01

    This paper reports on a project which investigates the impact of systemic environmental education (EE) programs on student achievement on EE-based integrated tests and standardized tests in math, language arts, and listening. Systemic environmental education programs are defined by curriculum designed to align and integrate subjects around real…

  10. The Bilingual Academic Services and Integrated Career Systems Program, BASICS 1988-1989. OREA Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Barrera, Marbella

    In its second year, the Bilingual Academic Services and Integrated Career Systems (BASICS) Program served 104 limited-English-proficient students at Bayside High School in Queens (New York City). Project goals were to develop English literacy skills, produce an organizing framework of thinking and language skills across the curriculum, generate a…

  11. Integrating Program Theory and Systems-Based Procedures in Program Evaluation: A Dynamic Approach to Evaluate Educational Programs

    ERIC Educational Resources Information Center

    Grammatikopoulos, Vasilis

    2012-01-01

    The current study attempts to integrate parts of program theory and systems-based procedures in educational program evaluation. The educational program that was implemented, called the "Early Steps" project, proposed that physical education can contribute to various educational goals apart from the usual motor skills improvement. Basic…

  12. Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

    NASA Technical Reports Server (NTRS)

    Jung, Yoon; Engelland, Shawn; Capps, Richard; Coppenbarger, Rich; Hooey, Becky; Sharma, Shivanjli; Stevens, Lindsay; Verma, Savita; Lohr, Gary; Chevalley, Eric; hide

    2018-01-01

    This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

  13. Current status of the joint Mayo Clinic-IBM PACS project

    NASA Astrophysics Data System (ADS)

    Hangiandreou, Nicholas J.; Williamson, Byrn, Jr.; Gehring, Dale G.; Persons, Kenneth R.; Reardon, Frank J.; Salutz, James R.; Felmlee, Joel P.; Loewen, M. D.; Forbes, Glenn S.

    1994-05-01

    A multi-phase collaboration between Mayo Clinic and IBM-Rochester was undertaken, with the goal of developing a picture archiving and communication system for routine clinical use in the Radiology Department. The initial phase of this project (phase 0) was started in 1988. The current system has been fully integrated into the clinical practice and, to date, over 6.5 million images from 16 imaging modalities have been archived. Phase 3 of this project has recently concluded.

  14. Prototype of Kepler Processing Workflows For Microscopy And Neuroinformatics

    PubMed Central

    Astakhov, V.; Bandrowski, A.; Gupta, A.; Kulungowski, A.W.; Grethe, J.S.; Bouwer, J.; Molina, T.; Rowley, V.; Penticoff, S.; Terada, M.; Wong, W.; Hakozaki, H.; Kwon, O.; Martone, M.E.; Ellisman, M.

    2016-01-01

    We report on progress of employing the Kepler workflow engine to prototype “end-to-end” application integration workflows that concern data coming from microscopes deployed at the National Center for Microscopy Imaging Research (NCMIR). This system is built upon the mature code base of the Cell Centered Database (CCDB) and integrated rule-oriented data system (IRODS) for distributed storage. It provides integration with external projects such as the Whole Brain Catalog (WBC) and Neuroscience Information Framework (NIF), which benefit from NCMIR data. We also report on specific workflows which spawn from main workflows and perform data fusion and orchestration of Web services specific for the NIF project. This “Brain data flow” presents a user with categorized information about sources that have information on various brain regions. PMID:28479932

  15. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  16. NREL and SDG&E Collaboration to Support SDG&E Grid and Storage Efforts: Cooperative Research and Development Final Report, CRADA Number CRD-14-562

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baggu, Murali

    2017-01-01

    This project will enable effective utilization of high penetration of photovoltaics (PV) in islanded microgrids, increasing overall system efficiency, decreased fuel costs and resiliency of the overall system to help meet the SunShot goals of enhancing system integration methods to increase penetration of PV. National Renewable Energy Laboratory (NREL) will collaborate with San Diego Gas & Electric (SDG&E) to provide research and testing support to address their needs in energy storage sizing and placement, Integrated Test Facility (ITF) development, Real Time Digital Simulator (RTDS) Modeling and simulation support at ITF, Visualization and Virtual connection to Energy Systems Integration Facility (ESIF),more » and microgrid simulation and testing areas. Specifically in this project a real microgrid scenario with high penetration of PV (existing in SDG&E territory) is tested in the ESIF laboratory. Multiple control cases for firming PV using storage in a microgrid scenario will be investigated and tested in the laboratory setup.« less

  17. Large Pilot CAER Heat Integrated Post-combustion CO 2 Capture Technology for Reducing the Cost of Electricity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Kunlei; Nikolic, Heather; Placido, Andrew

    The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0026497. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UKy-CAER) (Recipient) has developed an advanced, versatile, 10 MWe post-combustion CO 2 capture system (CCS) for a coal-fired power plant, Louisville Gas and Electric Company’s Trimble County Generating Station, using a heat integrated process combined with two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance. The proposed project (Phase 1 and 2) will involve the design, fabrication, installation and testing ofmore » a large pilot scale facility that will demonstrate the UKy-CAER innovative carbon capture system integrated with an operating supercritical power plant. Specifically during Phase 1, the Recipient has provided all necessary documentation to support its Phase 2 down-selection including: the Project Narrative, the updated Project Management Plan (PMP), the preliminary engineering design, the Technical and Economic Analysis report (TEA) (including the Case 12 – Major Equipment List and submitted as a Topical Report), a Phase 1 Technology Gap Analysis (TGA), an Environmental Health and Safety (EH&S) Assessment on the 10 MWe unit, and updated Phase 2 cost estimates (including the detailed design, procurement, construction, operation, and decommissioning costs) with a budget justification. Furthermore, the Recipient has proposed a combined modular and freestanding column configuration with an advanced absorber gas/liquid distribution system, an advanced solvent, with the integration of discrete packing, a smart cross-over heat exchanger, and a load and ambient condition following control strategy, all to address ten of 12 technology gaps identified during the Phase I work. If successful, the proposed heat integrated post-combustion CCS will pave the way to achieve the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL) CO 2 capture performance and cost target, as indicated in the submitted TEA and summarized in this report.« less

  18. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  19. Integrating Safety and Mission Assurance in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safety and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  20. Integrated Baseline Review (IBR) Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    An Integrated Baseline Review (IBR) is a review of a supplier?s Performance Measurement Baseline (PMB). It is conducted by Program/Project Managers and their technical staffs on contracts and in-house work requiring compliance with NASA Earned Value Management System (EVMS) policy as defined in program/project policy, NPR 7120.5, or in NASA Federal Acquisition Regulations. The IBR Handbook may also be of use to those responsible for preparing the Terms of Reference for internal project reviews. While risks may be identified and actions tracked as a result of the IBR, it is important to note that an IBR cannot be failed.

  1. Software Tools Streamline Project Management

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query-Based Document Management (QBDM) is a tool that enables content or context searches, either simple or hierarchical, across a variety of databases. The system enables users to specify notification subscriptions where they associate "contexts of interest" and "events of interest" to one or more documents or collection(s) of documents. Based on these subscriptions, users receive notification when the events of interest occur within the contexts of interest for associated document or collection(s) of documents. Users can also associate at least one notification time as part of the notification subscription, with at least one option for the time period of notifications.

  2. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Test act system description

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The engineering and fabrication of the test ACT system, produced in the third program element of the IAAC Project is documented. The system incorporates pitch-augmented stability and wing-load alleviation, plus full authority fly-by-wire control of the elevators. The pitch-augmented stability is designed to have reliability sufficient to allow flight with neutral or negative inherent longitudinal stability.

  3. Integration and Test of Shuttle Small Payloads

    NASA Technical Reports Server (NTRS)

    Wright, Michael R.

    2003-01-01

    Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

  4. Water quality success stories: Integrated assessments from the IOOS regional associations and national water quality monitoring network

    USGS Publications Warehouse

    Ragsdale, Rob; Vowinkel, Eric; Porter, Dwayne; Hamilton, Pixie; Morrison, Ru; Kohut, Josh; Connell, Bob; Kelsey, Heath; Trowbridge, Phil

    2011-01-01

    The Integrated Ocean Observing System (IOOS®) Regional Associations and Interagency Partners hosted a water quality workshop in January 2010 to discuss issues of nutrient enrichment and dissolved oxygen depletion (hypoxia), harmful algal blooms (HABs), and beach water quality. In 2007, the National Water Quality Monitoring Council piloted demonstration projects as part of the National Water Quality Monitoring Network (Network) for U.S. Coastal Waters and their Tributaries in three IOOS Regional Associations, and these projects are ongoing. Examples of integrated science-based solutions to water quality issues of major concern from the IOOS regions and Network demonstration projects are explored in this article. These examples illustrate instances where management decisions have benefited from decision-support tools that make use of interoperable data. Gaps, challenges, and outcomes are identified, and a proposal is made for future work toward a multiregional water quality project for beach water quality.

  5. Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.

  6. NATIONAL ELECTRONIC DISEASE SURVEILLANCE SYSTEM (NEDSS)

    EPA Science Inventory

    The National Electronic Disease Surveillance System (NEDSS) project is a public health initiative to provide a standard-based, integrated approach to disease surveillance and to connect public health surveillance to the burgeoning clinical information systems infrastructure. NEDS...

  7. Land mobile radio system phase I pilot report

    DOT National Transportation Integrated Search

    2003-12-15

    This report presents an executive summary, the project overview, Intelligent Transportation System standards and lessons learned for implementation of an Integrated Voice and Data, Land Mobile Radio System (ITS technologies for the Alaska Department ...

  8. Environmental impact assessment of transportation projects: An analysis using an integrated GIS, remote sensing, and spatial modeling approach

    NASA Astrophysics Data System (ADS)

    El-Gafy, Mohamed Anwar

    Transportation projects will have impact on the environment. The general environmental pollution and damage caused by roads is closely associated with the level of economic activity. Although Environmental Impact Assessments (EIAs) are dependent on geo-spatial information in order to make an assessment, there are no rules per se how to conduct an environmental assessment. Also, the particular objective of each assessment is dictated case-by-case, based on what information and analyses are required. The conventional way of Environmental Impact Assessment (EIA) study is a time consuming process because it has large number of dependent and independent variables which have to be taken into account, which also have different consequences. With the emergence of satellite remote sensing technology and Geographic Information Systems (GIS), this research presents a new framework for the analysis phase of the Environmental Impact Assessment (EIA) for transportation projects based on the integration between remote sensing technology, geographic information systems, and spatial modeling. By integrating the merits of the map overlay method and the matrix method, the framework analyzes comprehensively the environmental vulnerability around the road and its impact on the environment. This framework is expected to: (1) improve the quality of the decision making process, (2) be applied both to urban and inter-urban projects, regardless of transport mode, and (3) present the data and make the appropriate analysis to support the decision of the decision-makers and allow them to present these data to the public hearings in a simple manner. Case studies, transportation projects in the State of Florida, were analyzed to illustrate the use of the decision support framework and demonstrate its capabilities. This cohesive and integrated system will facilitate rational decisions through cost effective coordination of environmental information and data management that can be tailored to specific projects. The framework would facilitate collecting, organizing, analyzing, archiving, and coordinating the information and data necessary to support technical and policy transportation decisions.

  9. UAS Integration into the NAS: Detect and Avoid Display Evaluations in Support of SC-228 MOPS Development

    NASA Technical Reports Server (NTRS)

    Fern, Lisa; Rorie, Conrad; Shively, Jay

    2015-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS Integration into the NAS project. Much of the work has been used to support the ongoing development of minimum operational performance standards (MOPS) for UAS by RTCA Special Committee 228. The design and results of three different human-in-the-loop simulations are discussed, with particular emphasis on the role of the UAS pilot in the Self Separation Timeline.

  10. integrated Earth System Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, Andew; Di Vittorio, Alan; Collins, William

    The integrated Earth system model (iESM) has been developed as a new tool for projecting the joint human/climate system. The iESM is based upon coupling an integrated assessment model (IAM) and an Earth system model (ESM) into a common modeling infrastructure. IAMs are the primary tool for describing the human-Earth system, including the sources of global greenhouse gases (GHGs) and short-lived species (SLS), land use and land cover change (LULCC), and other resource-related drivers of anthropogenic climate change. ESMs are the primary scientific tools for examining the physical, chemical, and biogeochemical impacts of human-induced changes to the climate system. Themore » iESM project integrates the economic and human-dimension modeling of an IAM and a fully coupled ESM within a single simulation system while maintaining the separability of each model if needed. Both IAM and ESM codes are developed and used by large communities and have been extensively applied in recent national and international climate assessments. By introducing heretofore-omitted feedbacks between natural and societal drivers, we can improve scientific understanding of the human-Earth system dynamics. Potential applications include studies of the interactions and feedbacks leading to the timing, scale, and geographic distribution of emissions trajectories and other human influences, corresponding climate effects, and the subsequent impacts of a changing climate on human and natural systems.« less

  11. The TRAINS project: A case study in building a conversational planning agent

    NASA Astrophysics Data System (ADS)

    Allen, James F.; Schubert, Lenhart K.; Ferguson, George; Heeman, Peter; Hwang, Chung Hee; Kato, Tsuneaki; Light, Marc; Martin, Nathaniel G.; Miller, Bradford W.; Poesio, Massimo

    1994-09-01

    The TRAINS project is an effort to build a conversationally proficient planning assistant. A key part of the project is the construction of the TRAINS system, which provides the research platform for a wide range of issues in natural language understanding, mixed-initiative planning systems, and representing and reasoning about time, actions and events. Four years have not passed since the beginning of the project. Each year, we produced a demonstration system that focused on a dialog that illustrated particular aspects of our research. The commitment to building complete integrated systems is a significant overhead on the research, but we feel it is essential to guarantee that the results constitute real progress in the field. This paper describes the goals of the project, and our experience with the effort so far.

  12. Integrated, automated revenue management for managed care contracts.

    PubMed

    Burckhart, Kent

    2002-04-01

    Faced with increasing managed care penetration and declining net revenue in recent years, healthcare providers increasingly are emphasizing revenue management. To streamline processes and reduce costs in this area, many healthcare providers have implemented or are considering automated contract management systems. When selecting such a system, healthcare financial managers should make certain that the system can interface with both patient-accounting and decision-support systems of the organization. This integration enhances a healthcare provider's financial viability by providing integrated revenue-management capabilities to analyze projected performance of proposed managed care contracts and actual performance of existing contracts.

  13. Management of Service Projects in Support of Space Flight Research

    NASA Technical Reports Server (NTRS)

    Love, J.

    2009-01-01

    Goal:To provide human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration . [HRP-47051] Specific Objectives: 1) Develop capabilities, necessary countermeasures, and technologies in support of human space exploration, focusing on mitigating the highest risks to human health and performance. 2) Define and improve human spaceflight medical, environmental, and human factors standards. 3) Develop technologies that serve to reduce medical and environmental risks, to reduce human systems resource requirements (mass, volume, power, data, etc.) and to ensure effective human-system integration across exploration systems. 4) Ensure maintenance of Agency core competencies necessary to enable risk reduction in the following areas: A. Space medicine B. Physiological and behavioral effects of long duration spaceflight on the human body C. Space environmental effects, including radiation, on human health and performance D. Space "human factors" [HRP-47051]. Service projects can form integral parts of research-based project-focused programs to provide specialized functions. Traditional/classic project management methodologies and agile approaches are not mutually exclusive paradigms. Agile strategies can be combined with traditional methods and applied in the management of service projects functioning in changing environments. Creative collaborations afford a mechanism for mitigation of constrained resource limitations.

  14. Re-Engineering Complex Legacy Systems at NASA

    NASA Technical Reports Server (NTRS)

    Ruszkowski, James; Meshkat, Leila

    2010-01-01

    The Flight Production Process (FPP) Re-engineering project has established a Model-Based Systems Engineering (MBSE) methodology and the technological infrastructure for the design and development of a reference, product-line architecture as well as an integrated workflow model for the Mission Operations System (MOS) for human space exploration missions at NASA Johnson Space Center. The design and architectural artifacts have been developed based on the expertise and knowledge of numerous Subject Matter Experts (SMEs). The technological infrastructure developed by the FPP Re-engineering project has enabled the structured collection and integration of this knowledge and further provides simulation and analysis capabilities for optimization purposes. A key strength of this strategy has been the judicious combination of COTS products with custom coding. The lean management approach that has led to the success of this project is based on having a strong vision for the whole lifecycle of the project and its progress over time, a goal-based design and development approach, a small team of highly specialized people in areas that are critical to the project, and an interactive approach for infusing new technologies into existing processes. This project, which has had a relatively small amount of funding, is on the cutting edge with respect to the utilization of model-based design and systems engineering. An overarching challenge that was overcome by this project was to convince upper management of the needs and merits of giving up more conventional design methodologies (such as paper-based documents and unwieldy and unstructured flow diagrams and schedules) in favor of advanced model-based systems engineering approaches.

  15. Integrated Distribution Management System for Alabama Principal Investigator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schatz, Joe

    2013-03-31

    Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables datamore » access and enterprise application integration.« less

  16. HPC AND GRID COMPUTING FOR INTEGRATIVE BIOMEDICAL RESEARCH

    PubMed Central

    Kurc, Tahsin; Hastings, Shannon; Kumar, Vijay; Langella, Stephen; Sharma, Ashish; Pan, Tony; Oster, Scott; Ervin, David; Permar, Justin; Narayanan, Sivaramakrishnan; Gil, Yolanda; Deelman, Ewa; Hall, Mary; Saltz, Joel

    2010-01-01

    Integrative biomedical research projects query, analyze, and integrate many different data types and make use of datasets obtained from measurements or simulations of structure and function at multiple biological scales. With the increasing availability of high-throughput and high-resolution instruments, the integrative biomedical research imposes many challenging requirements on software middleware systems. In this paper, we look at some of these requirements using example research pattern templates. We then discuss how middleware systems, which incorporate Grid and high-performance computing, could be employed to address the requirements. PMID:20107625

  17. NASA's Nuclear Thermal Propulsion Project

    NASA Technical Reports Server (NTRS)

    Houts, Mike; Mitchell, Sonny; Kim, Tony; Borowski, Stan; Power, Kevin; Scott, John; Belvin, Anthony; Clement, Steve

    2015-01-01

    HEOMD's (Human Exploration and Operations Mission Directorate) AES (Advanced Exploration Systems) Nuclear Thermal Propulsion (NTP) project is making significant progress. First of four FY 2015 milestones achieved this month. Safety is the highest priority for NTP (as with other space systems). After safety comes affordability. No centralized capability for developing, qualifying, and utilizing an NTP system. Will require a strong, closely integrated team. Tremendous potential benefits from NTP and other space fission systems. No fundamental reason these systems cannot be developed and utilized in a safe, affordable fashion.

  18. Simulated NASA Satellite Data Products for the NOAA Integrated Coral Reef Observation Network/Coral Reef Early Warning System

    NASA Technical Reports Server (NTRS)

    Estep, Leland; Spruce, Joseph P.

    2007-01-01

    This RPC (Rapid Prototyping Capability) experiment will demonstrate the use of VIIRS (Visible/Infrared Imager/Radiometer Suite) and LDCM (Landsat Data Continuity Mission) sensor data as significant input to the NOAA (National Oceanic and Atmospheric Administration) ICON/ CREWS (Integrated Coral Reef Observation System/Coral Reef Early Warning System). The project affects the Coastal Management Program Element of the Applied Sciences Program.

  19. NASA Dryden Status

    NASA Technical Reports Server (NTRS)

    Jacobson, Steve R.

    2009-01-01

    This slide presentation reviews several projects that NASA Dryden personnel are involved with: Integrated Resilient Aircraft Controls Project (IRAC), NASA G-III Research Aircraft, X-48B Blended Wing Body aircraft, Stratospheric Observatory for Infrared Astronomy (SOFIA), and the Orion CEV Launch Abort Systems Tests.

  20. Integration Process for the Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Gill, Tracy; Merbitz, Jerad; Kennedy, Kriss; Tn, Terry; Toups, Larry; Howe, A. Scott; Smitherman, David

    2011-01-01

    The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities. The HDU previously served as a test bed for testing technologies and sub-systems in a terrestrial surface environment. in 2010 in the Pressurized Excursion Module (PEM) configuration. Due to the amount of work involved to make the HDU project successful, the HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators The size of the team and number of systems involved With the HDU makes Integration a complicated process. However, because the HDU shell manufacturing is complete, the team has a head start on FY--11 integration activities and can focus on integrating upgrades to existing systems as well as integrating new additions. To complete the development of the FY-11 HDU from conception to rollout for operations in July 2011, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads. The highlighted HDU work for FY-11 will focus on performing upgrades to the PEM configuration, adding the X-Hab as a second level, adding a new porch providing the astronauts a larger work area outside the HDU for EVA preparations, and adding a Hygiene module. Together these upgrades result in a prototype configuration of the Deep Space Habitat (DSH), an element under evaluation by NASA's Human Exploration Framework Team (HEFT) Scheduled activates include early fit-checks and the utilization of a Habitat avionics test bed prior to installation into HDU. A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development. Modeling tools have been effective in hardware systems layout, cable routing, sub-system interface length estimation and human factors analysis. Decision processes on integration and use of all new subsystems will be defined early in the project to maximize the efficiency of both integration and field operations. In addition a series of tailored design reviews are utilized to quickly define the systems and their integration into the DSH configuration. These processes are necessary to ensure activities, such as partially reversing integration of the X-Hab second story of the HDU and deploying and stowing the new work porch for transportation to the JSC Rock Yard and to the Arizona Black Point Lava Flow Site are performed with minimal or no complications. In addition, incremental test operations leading up to an Integrated systems test allows for an orderly systems test program. For FY-11 activities, the HDU DSH will act as a laboratory utilizing a new X-Hab inflatable second floor with crew habitation features. In addition to the day to day operations involving maintenance of the HDU and exploring the surrounding terrain, testing and optimizing the use of the new X-Hab, work porch, Hygiene Module, and other sub-system enhancements will be the focus of the FY-11 test objectives. The HDU team requires a successful integration strategy using a variety of tools and approaches to prepare the DSH for these test objectives. In a challenging environment where the prototyping influences the system design, as well as Vice versa, results of the HDU DSH field tests will influence future designs of habitat systems.

  1. Landfill mining in Austria: foundations for an integrated ecological and economic assessment.

    PubMed

    Hermann, Robert; Baumgartner, Rupert J; Sarc, Renato; Ragossnig, Arne; Wolfsberger, Tanja; Eisenberger, Martin; Budischowsky, Andreas; Pomberger, Roland

    2014-09-01

    For the first time, basic technical and economic studies for landfill mining are being carried out in Austria on the basis of a pilot project. An important goal of these studies is the collection of elementary data as the basis for an integrated ecological and economic assessment of landfill mining projects with regard to their feasibility. For this purpose, economic, ecological, technical, organizational, as well as political and legal influencing factors are identified and extensively studied in the article. An important aspect is the mutual influence of the factors on each other, as this can significantly affect the development of an integrated assessment system. In addition to the influencing factors, the definition of the spatial and temporal system boundaries is crucial for further investigations. Among others, the quality and quantity of recovered waste materials, temporal fluctuations or developments in prices of secondary raw material and fuels attainable in the markets, and time and duration of dumping, play a crucial role. Based on the investigations, the spatial system boundary is defined in as much as all the necessary process steps, from landfill mining, preparing and sorting to providing a marketable material/product by the landfill operator, are taken into account. No general accepted definition can be made for the temporal system boundary because the different time-related influencing factors necessitate an individual project-specific determination and adaptation to the facts of the on-site landfill mining project. © The Author(s) 2014.

  2. 2 kWe Solar Dynamic Ground Test Demonstration Project. Volume 1; Executive Summary

    NASA Technical Reports Server (NTRS)

    Alexander, Dennis

    1997-01-01

    The Solar Dynamic Ground Test Demonstration (SDGTD) successfully demonstrated a solar-powered closed Brayton cycle system in a relevant space thermal environment. In addition to meeting technical requirements the project was completed 4 months ahead of schedule and under budget. The following conclusions can be supported: 1. The component technology for solar dynamic closed Brayton cycle technology has clearly been demonstrated. 2. The thermal, optical, control, and electrical integration aspects of systems integration have also been successfully demonstrated. Physical integration aspects were not attempted as these tend to be driven primarily by mission-specific requirements. 3. System efficiency of greater than 15 percent (all losses fully accounted for) was demonstrated using equipment and designs which were not optimized. Some preexisting hardware was used to minimize cost and schedule. 4. Power generation of 2 kWe. 5. A NASA/industry team was developed that successfully worked together to accomplish project goals. The material presented in this report will show that the technology necessary to design and fabricate solar dynamic electrical power systems for space has been successfully developed and demonstrated. The data will further show that achieved results compare well with pretest predictions. The next step in the development of solar dynamic space power will be a flight test.

  3. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  4. Integrated Ground Operations Demonstration Units Testing Plans and Status

    NASA Technical Reports Server (NTRS)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  5. Analysis of methods. [information systems evolution environment

    NASA Technical Reports Server (NTRS)

    Mayer, Richard J. (Editor); Ackley, Keith A.; Wells, M. Sue; Mayer, Paula S. D.; Blinn, Thomas M.; Decker, Louis P.; Toland, Joel A.; Crump, J. Wesley; Menzel, Christopher P.; Bodenmiller, Charles A.

    1991-01-01

    Information is one of an organization's most important assets. For this reason the development and maintenance of an integrated information system environment is one of the most important functions within a large organization. The Integrated Information Systems Evolution Environment (IISEE) project has as one of its primary goals a computerized solution to the difficulties involved in the development of integrated information systems. To develop such an environment a thorough understanding of the enterprise's information needs and requirements is of paramount importance. This document is the current release of the research performed by the Integrated Development Support Environment (IDSE) Research Team in support of the IISEE project. Research indicates that an integral part of any information system environment would be multiple modeling methods to support the management of the organization's information. Automated tool support for these methods is necessary to facilitate their use in an integrated environment. An integrated environment makes it necessary to maintain an integrated database which contains the different kinds of models developed under the various methodologies. In addition, to speed the process of development of models, a procedure or technique is needed to allow automatic translation from one methodology's representation to another while maintaining the integrity of both. The purpose for the analysis of the modeling methods included in this document is to examine these methods with the goal being to include them in an integrated development support environment. To accomplish this and to develop a method for allowing intra-methodology and inter-methodology model element reuse, a thorough understanding of multiple modeling methodologies is necessary. Currently the IDSE Research Team is investigating the family of Integrated Computer Aided Manufacturing (ICAM) DEFinition (IDEF) languages IDEF(0), IDEF(1), and IDEF(1x), as well as ENALIM, Entity Relationship, Data Flow Diagrams, and Structure Charts, for inclusion in an integrated development support environment.

  6. Nature and the river: a natural resources report of the Chicago and Calumet waterways.

    Treesearch

    Barbara J Moore; John D. Rogner; Drew Ullberg

    1998-01-01

    In 1992, the National Park Service initiated a project to galvanize local interest in the conservation and use of the Chicago Waterway System. The purpose of this project was to promote local stewardship of the waterway system through the integration of economic development, recreation, and environmental conservation. As a result, the ChicagoRivers Demonstration...

  7. Distributed Access View Integrated Database (DAVID) system

    NASA Technical Reports Server (NTRS)

    Jacobs, Barry E.

    1991-01-01

    The Distributed Access View Integrated Database (DAVID) System, which was adopted by the Astrophysics Division for their Astrophysics Data System, is a solution to the system heterogeneity problem. The heterogeneous components of the Astrophysics problem is outlined. The Library and Library Consortium levels of the DAVID approach are described. The 'books' and 'kits' level is discussed. The Universal Object Typer Management System level is described. The relation of the DAVID project with the Small Business Innovative Research (SBIR) program is explained.

  8. Programmable Automated Welding System (PAWS)

    NASA Technical Reports Server (NTRS)

    Kline, Martin D.

    1994-01-01

    An ambitious project to develop an advanced, automated welding system is being funded as part of the Navy Joining Center with Babcock & Wilcox as the prime integrator. This program, the Programmable Automated Welding System (PAWS), involves the integration of both planning and real-time control activities. Planning functions include the development of a graphical decision support system within a standard, portable environment. Real-time control functions include the development of a modular, intelligent, real-time control system and the integration of a number of welding process sensors. This paper presents each of these components of the PAWS and discusses how they can be utilized to automate the welding operation.

  9. A Modular Instrumentation System for NASA's Habitat Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Rojdev, Kristina; Kennedy, Kriss; Yim, Hester; Wagner, Raymond S.; Hong, Todd; Studor, George; Delaune, Paul

    2010-01-01

    NASA's human spaceflight program is focused on developing technologies to expand the reaches of human exploration and science activities beyond low earth orbit. A critical aspect of living in space or on planetary surfaces is habitation, which provides a safe and comfortable space in which humans can live and work. NASA is seeking out the best option for habitation by exploring several different concepts through the Habitat Demonstration Unit (HDU) project. The purpose of this HDU is to develop a fully autonomous habitation system that enables human exploration of space. One critical feature of the HDU project that helps to accomplish its mission of autonomy is the instrumentation system that monitors key subsystems operating within a Habitat configuration. The following paper will discuss previous instrumentation systems used in analog habitat concepts and how the current instrumentation system being implemented on the HDU1-PEM, or pressurized excursion module, is building upon the lessons learned of those previous systems. Additionally, this paper will discuss the benefits and the limitations of implementing a wireless sensor network (WSN) as the basis for data transport in the instrumentation system. Finally, this paper will address the experiences and lessons learned with integration, testing prior to deployment, and field testing at the JSC rock yard. NASA is developing the HDU1-PEM as a step towards a fully autonomous habitation system that enables human exploration of space. To accomplish this purpose, the HDU project is focusing on development, integration, testing, and evaluation of habitation systems. The HDU will be used as a technology pull, testbed, and integration environment in which to advance NASA's understanding of alternative mission architectures, requirements, and operations concepts definition and validation. This project is a multi-year effort. In 2010, the HDU1-PEM will be in a pressurized excursion module configuration, and in 2011 the module will be reconfigured for a pressurized core module configuration. Each year the HDU configurations will undergo testing at NASA's Desert Research and Technology Studies (D-RaTS) in Arizona [1]. As part of this project, a modular instrumentation system is developed to meet the monitoring needs of the HDU subsystems and to integrate with the current command and data handling infrastructure that has been developed for the project. The main objective of this study is to provide for the monitoring needs of the HDU. The requirements necessary to meet this objective are developed by working with the subsystem managers of the HDU to understand their monitoring needs. Additionally, the instrumentation system design leverages knowledge and lessons learned from previous studies, such as the inflatable habitat health monitoring system that was deployed in Antarctica [2], the integrated health monitoring system developed for NASA's Microhab [3], and the JSC Lunar Habitat Wireless Testbed to demonstrate a "standardsbased" approach to a wireless instrumentation system [4]. The HDU also requires flexibility in reconfiguration options, and it is necessary to demonstrate and evaluate a modular approach to an instrumentation system. Thus, the instrumentation system is designed in two parts: the primary system employs a standard WSN configuration, and the secondary system employs a wired USB hub. The WSN design provides for reconfiguration or replacement of sensors due to malfunctions or upgrades by using a wireless node that accepts ten instrument inputs and wirelessly transmits the data to the command and data handling system. The USB hub is necessary for those instruments that operate using a wired USB connection, although the design attempts to limit the amount of sensors that need to be wired connections.

  10. Appendix Y. The Integrated Communications Experiment (ICE) Summary.

    ERIC Educational Resources Information Center

    Coffin, Robert

    This appendix describes the Integrated Communications Experiment (ICE), a comprehensive computer software capability developed for the ComField Project. Each major characteristic of the data processing system is treated separately: natural language processing, flexibility, noninterference with the educational process, multipurposeness,…

  11. Integrated Natural Resources Management Plan Grand Forks Air Force Base, North Dakota. 2004-2008

    DTIC Science & Technology

    2005-12-01

    5-37 5.7 Integrated Pest Management...5-44 5.7.3 Animal Pest Control...mph MSL 2005 INRMP Update 319th Civil Engineer Squadron/Environmental Management Automated Civil Engineer System Project Management Air Combat

  12. Dallas integrated corridor management (ICM) transit vehicle real-time data demonstration.

    DOT National Transportation Integrated Search

    2015-01-01

    This project demonstrated and evaluated the ability to collect and transmit transit location and passenger loading data to a transit management center(s) and/or Integrated Corridor Management (ICM) system in real time. It also demonstrated and evalua...

  13. Remote and terrestrial ground monitoring techniques integration for hazard assessment in mountain areas

    NASA Astrophysics Data System (ADS)

    Chinellato, Giulia; Kenner, Robert; Iasio, Christian; Mair, Volkmar; Mosna, David; Mulas, Marco; Phillips, Marcia; Strada, Claudia; Zischg, Andreas

    2014-05-01

    In high mountain regions the choice of appropriate sites for infrastructure such as roads, railways, cable cars or hydropower dams is often very limited. In parallel, the increasing demand for supply infrastructure in the Alps induces a continuous transformation of the territory. The new role played by the precautionary monitoring in the risk governance becomes fundamental and may overcome the modeling of future events, which represented so far the predominant approach to these sort of issues. Furthermore the consequence of considering methodologies alternative to those more exclusive allow to reduce costs and increasing the frequency of measurements, updating continuously the cognitive framework of existing hazard condition in most susceptible territories. The scale factor of the observed area and the multiple purpose of such regional ordinary surveys make it convenient to adopt Radar Satellite-based systems, but they need to be integrated with terrestrial systems for validation and eventual early warning purposes. Significant progress over the past decade in Remote Sensing (RS), Proximal Sensing and integration-based sensor networks systems now provide technologies, that allow to implement monitoring systems for ordinary surveys of extensive areas or regions, which are affected by active natural processes and slope instability. The Interreg project SloMove aims to provide solutions for such challenges and focuses on using remote sensing monitoring techniques for the monitoring of mass movements in two test sites, in South Tyrol (Italy) and in Grisons Canton (Switzerland). The topics faced in this project concern mass movements and slope deformation monitoring techniques, focusing mainly on the integration of multi-temporal interferometry, new generation of terrestrial technologies for differential digital terrain model elaboration provided by laser scanner (TLS), and GNSS-based topographic surveys, which are used not only for validation purpose, but also for adding value and information to the whole monitoring survey. The test sites are currently observed by an original integrated methodology specifically developed within the aim of the project. The integrated monitoring design includes reference targets for the different monitoring systems placed together on the same point or rigid foundation, to facilitate the comparison of the data and, in the operational use, to be able to switch consistently from one to the other system. The principal goal of the project is to define a shared procedure to select scalable technologies, best practices and institutional action plans more adequate to deal with different sort of hazard related to ground displacement, in densely populated mountain areas containing recreational and critical infrastructures. Keywords: integrated monitoring, multi-temporal interferometry, artificial reflectors; mass movement, SloMove.eu

  14. Investigating the Primary School Teachers' Perspectives on the Use of Education Platforms in Teaching

    ERIC Educational Resources Information Center

    Uredi, Lütfi; Akbasli, Sait; Ulum, Hakan

    2016-01-01

    Technology plays an important role in educational activities in Turkey. This is largely because of the Faith Project, which was recently introduced into the country. The Fatih Project is a project of Turkish government which seeks to integrate computer technology into the country's public education system. Education Informatics Network is one of…

  15. 2017 TRIAD Small Business Advisory Panel

    DTIC Science & Technology

    2017-10-11

    government service in 2007 as the Science & Technology (S&T) Project Manager for the United States Navy’s Unmanned Maritime Systems Program Office...National Renewable Energy Laboratory (NREL) as a Program Manager for over 110 energy and water projects on military installations. He worked... management , project management , program management , donor relation service, contract and subcontract policy development and implementation, data integrity

  16. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    ERIC Educational Resources Information Center

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  17. Database Design Learning: A Project-Based Approach Organized through a Course Management System

    ERIC Educational Resources Information Center

    Dominguez, Cesar; Jaime, Arturo

    2010-01-01

    This paper describes an active method for database design learning through practical tasks development by student teams in a face-to-face course. This method integrates project-based learning, and project management techniques and tools. Some scaffolding is provided at the beginning that forms a skeleton that adapts to a great variety of…

  18. Guidelines for NASA Missions to Engage the User Community as a Part of the Mission Life Cycle

    NASA Astrophysics Data System (ADS)

    Escobar, V. M.; Friedl, L.; Bonniksen, C. K.

    2017-12-01

    NASA continues to improve the Earth Science Directorate in the areas of thematic integration, stakeholder feedback and Project Applications Program tailoring for missions to transfer knowledge between scientists and projects. The integration of application themes and the implementation of application science activities in flight projects have evolved to formally include user feedback and stakeholder integration. NASA's new Flight Applied Science Program Guidelines are designed to bridge NASA Earth Science Directorates in Flight, Applied Sciences and Research and Development by agreeing to integrate the user community into mission life cycles. Thus science development and science applications will guide all new instruments launched by NASAs ESD. The continued integration with the user community has enabled socio-economic considerations into NASA Earth Science projects to advance significantly. Making users a natural part of mission science leverages future socio-economic impact research and provides a platform for innovative and more actionable product to be used in decision support systems by society. This presentation will give an overview of the new NASA Guidelines and provide samples that demonstrate how the user community can be a part of NASA mission designs.

  19. THz transceiver characterization : LDRD project 139363 final report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nordquist, Christopher Daniel; Wanke, Michael Clement; Cich, Michael Joseph

    2009-09-01

    LDRD Project 139363 supported experiments to quantify the performance characteristics of monolithically integrated Schottky diode + quantum cascade laser (QCL) heterodyne mixers at terahertz (THz) frequencies. These integrated mixers are the first all-semiconductor THz devices to successfully incorporate a rectifying diode directly into the optical waveguide of a QCL, obviating the conventional optical coupling between a THz local oscillator and rectifier in a heterodyne mixer system. This integrated mixer was shown to function as a true heterodyne receiver of an externally received THz signal, a breakthrough which may lead to more widespread acceptance of this new THz technology paradigm. Inmore » addition, questions about QCL mode shifting in response to temperature, bias, and external feedback, and to what extent internal frequency locking can improve stability have been answered under this project.« less

  20. Evolution of A Distributed Live, Virtual, Constructive Environment for Human in the Loop Unmanned Aircraft Testing

    NASA Technical Reports Server (NTRS)

    Murphy, James R.; Otto, Neil M.

    2017-01-01

    NASA's Unmanned Aircraft Systems Integration in the National Airspace System Project is conducting human in the loop simulations and flight testing intended to reduce barriers associated with enabling routine airspace access for unmanned aircraft. The primary focus of these tests is interaction of the unmanned aircraft pilot with the display of detect and avoid alerting and guidance information. The project's integrated test and evaluation team was charged with developing the test infrastructure. As with any development effort, compromises in the underlying system architecture and design were made to allow for the rapid prototyping and open-ended nature of the research. In order to accommodate these design choices, a distributed test environment was developed incorporating Live, Virtual, Constructive, (LVC) concepts. The LVC components form the core infrastructure support simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This LVC infrastructure enables efficient testing by leveraging the use of existing assets distributed across multiple NASA Centers. Using standard LVC concepts enable future integration with existing simulation infrastructure.

  1. Evolution of A Distributed Live, Virtual, Constructive Environment for Human in the Loop Unmanned Aircraft Testing

    NASA Technical Reports Server (NTRS)

    Murphy, Jim; Otto, Neil

    2017-01-01

    NASA's Unmanned Aircraft Systems Integration in the National Airspace System Project is conducting human in the loop simulations and flight testing intended to reduce barriers associated with enabling routine airspace access for unmanned aircraft. The primary focus of these tests is interaction of the unmanned aircraft pilot with the display of detect and avoid alerting and guidance information. The projects integrated test and evaluation team was charged with developing the test infrastructure. As with any development effort, compromises in the underlying system architecture and design were made to allow for the rapid prototyping and open-ended nature of the research. In order to accommodate these design choices, a distributed test environment was developed incorporating Live, Virtual, Constructive, (LVC) concepts. The LVC components form the core infrastructure support simulation of UAS operations by integrating live and virtual aircraft in a realistic air traffic environment. This LVC infrastructure enables efficient testing by leveraging the use of existing assets distributed across multiple NASA Centers. Using standard LVC concepts enable future integration with existing simulation infrastructure.

  2. Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fletcher, James H.; Cox, Philip; Harrington, William J

    2013-09-03

    ABSTRACT Project Title: Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing PROJECT OBJECTIVE The objective of the project was to advance portable fuel cell system technology towards the commercial targets of power density, energy density and lifetime. These targets were laid out in the DOE’s R&D roadmap to develop an advanced direct methanol fuel cell power supply that meets commercial entry requirements. Such a power supply will enable mobile computers to operate non-stop, unplugged from the wall power outlet, by using the high energy density of methanol fuel contained in a replaceable fuel cartridge. Specifically this project focusedmore » on balance-of-plant component integration and miniaturization, as well as extensive component, subassembly and integrated system durability and validation testing. This design has resulted in a pre-production power supply design and a prototype that meet the rigorous demands of consumer electronic applications. PROJECT TASKS The proposed work plan was designed to meet the project objectives, which corresponded directly with the objectives outlined in the Funding Opportunity Announcement: To engineer the fuel cell balance-of-plant and packaging to meet the needs of consumer electronic systems, specifically at power levels required for mobile computing. UNF used existing balance-of-plant component technologies developed under its current US Army CERDEC project, as well as a previous DOE project completed by PolyFuel, to further refine them to both miniaturize and integrate their functionality to increase the system power density and energy density. Benefits of UNF’s novel passive water recycling MEA (membrane electrode assembly) and the simplified system architecture it enabled formed the foundation of the design approach. The package design was hardened to address orientation independence, shock, vibration, and environmental requirements. Fuel cartridge and fuel subsystems were improved to ensure effective fuel containment. PROJECT OVERVIEW The University of North Florida (UNF), with project partner the University of Florida, recently completed the Department of Energy (DOE) project entitled “Advanced Direct Methanol Fuel Cell for Mobile Computing”. The primary objective of the project was to advance portable fuel cell system technology towards the commercial targets as laid out in the DOE R&D roadmap by developing a 20-watt, direct methanol fuel cell (DMFC), portable power supply based on the UNF innovative “passive water recovery” MEA. Extensive component, sub-system, and system development and testing was undertaken to meet the rigorous demands of the consumer electronic application. Numerous brassboard (nonpackaged) systems were developed to optimize the integration process and facilitating control algorithm development. The culmination of the development effort was a fully-integrated, DMFC, power supply (referred to as DP4). The project goals were 40 W/kg for specific power, 55 W/l for power density, and 575 Whr/l for energy density. It should be noted that the specific power and power density were for the power section only, and did not include the hybrid battery. The energy density is based on three, 200 ml, fuel cartridges, and also did not include the hybrid battery. The results show that the DP4 system configured without the methanol concentration sensor exceeded all performance goals, achieving 41.5 W/kg for specific power, 55.3 W/l for power density, and 623 Whr/l for energy density. During the project, the DOE revised its technical targets, and the definition of many of these targets, for the portable power application. With this revision, specific power, power density, specific energy (Whr/kg), and energy density are based on the total system, including fuel tank, fuel, and hybridization battery. Fuel capacity is not defined, but the same value is required for all calculations. Test data showed that the DP4 exceeded all 2011 Technical Status values; for example, the DP4 energy density was 373 Whr/l versus the DOE 2011 status of 200 Whr/l. For the DOE 2013 Technical Goals, the operation time was increased from 10 hours to 14.3 hours. Under these conditions, the DP4 closely approached or surpassed the technical targets; for example, the DP4 achieved 468 Whr/l versus the goal of 500 Whr/l. Thus, UNF has successfully met the project goals. A fully-operational, 20-watt DMFC power supply was developed based on the UNF passive water recovery MEA. The power supply meets the project performance goals and advances portable power technology towards the commercialization targets set by the DOE.« less

  3. Using Participatory Methods and Geographic Information Systems (GIS) to Prepare for an HIV Community-Based Trial in Vulindlela, South Africa (Project Accept-HPTN 043)

    ERIC Educational Resources Information Center

    Chirowodza, Admire; van Rooyen, Heidi; Joseph, Philip; Sikotoyi, Sindisiwe; Richter, Linda; Coates, Thomas

    2009-01-01

    Recent attempts to integrate geographic information systems (GIS) and participatory techniques, have given rise to terminologies such as "participatory GIS" and "community-integrated GIS". Although GIS was initially developed for physical geographic application, it can be used for the management and analysis of health and…

  4. ICAROUS - Integrated Configurable Algorithms for Reliable Operations Of Unmanned Systems

    NASA Technical Reports Server (NTRS)

    Consiglio, María; Muñoz, César; Hagen, George; Narkawicz, Anthony; Balachandran, Swee

    2016-01-01

    NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This paper describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and contingency control functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.

  5. Computer interfaces for the visually impaired

    NASA Technical Reports Server (NTRS)

    Higgins, Gerry

    1991-01-01

    Information access via computer terminals extends to blind and low vision persons employed in many technical and nontechnical disciplines. Two aspects are detailed of providing computer technology for persons with a vision related handicap. First, research into the most effective means of integrating existing adaptive technologies into information systems was made. This was conducted to integrate off the shelf products with adaptive equipment for cohesive integrated information processing systems. Details are included that describe the type of functionality required in software to facilitate its incorporation into a speech and/or braille system. The second aspect is research into providing audible and tactile interfaces to graphics based interfaces. Parameters are included for the design and development of the Mercator Project. The project will develop a prototype system for audible access to graphics based interfaces. The system is being built within the public domain architecture of X windows to show that it is possible to provide access to text based applications within a graphical environment. This information will be valuable to suppliers to ADP equipment since new legislation requires manufacturers to provide electronic access to the visually impaired.

  6. ICAROUS: Integrated Configurable Architecture for Unmanned Systems

    NASA Technical Reports Server (NTRS)

    Consiglio, Maria C.

    2016-01-01

    NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This video describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the auspices of the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and autonomous detect and avoid functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.

  7. Systems autonomy

    NASA Technical Reports Server (NTRS)

    Lum, Henry, Jr.

    1988-01-01

    Information on systems autonomy is given in viewgraph form. Information is given on space systems integration, intelligent autonomous systems, automated systems for in-flight mission operations, the Systems Autonomy Demonstration Project on the Space Station Thermal Control System, the architecture of an autonomous intelligent system, artificial intelligence research issues, machine learning, and real-time image processing.

  8. A Survey of Applications and Research in Integrated Design Systems Technology

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The initial part of the study was begun with a combination of literature searches, World Wide Web searches, and contacts with individuals and companies who were known to members of our team to have an interest in topics that seemed to be related to our study. There is a long list of such topics, such as concurrent engineering, design for manufacture, life-cycle engineering, systems engineering, systems integration, systems design, design systems, integrated product and process approaches, enterprise integration, integrated product realization, and similar terms. These all capture, at least in part, the flavor of what we describe here as integrated design systems. An inhibiting factor in this inquiry was the absence of agreed terminology for the study of integrated design systems. It is common for the term to be applied to what are essentially augmented Computer-Aided Design (CAD) systems, which are integrated only to the extent that agreements have been reached to attach proprietary extensions to proprietary CAD programs. It is also common for some to use the term integrated design systems to mean a system that applies only, or mainly, to the design phase of a product life cycle. It is likewise common for many of the terms listed earlier to be used as synonyms for integrated design systems. We tried to avoid this ambiguity by adopting the definition of integrated design systems that is implied in the introductory notes that we provided to our contacts, cited earlier. We thus arrived at this definition: Integrated Design Systems refers to the integration of the different tools and processes that comprise the engineering, of complex systems. It takes a broad view of the engineering of systems, to include consideration of the entire product realization process and the product life cycle. An important aspect of integrated design systems is the extent to which they integrate existing, "islands of automation" into a comprehensive design and product realization environment. As the study progressed, we relied increasingly upon a networking approach to lead us to new information. The departure point for such searches often was a government-sponsored project or a company initiative. The advantage of this approach was that short conversations with knowledgeable persons would usually cut through confusion over differences of terminology, thereby somewhat reducing the search space of the study. Even so, it was not until late in our eight-month inquiry that we began to see signs of convergence of the search, in the sense that a number of the latest inquiries began to turn up references to earlier contacts. As suggested above, this convergence often occurred with respect to particular government or company projects.

  9. Groundwater Data Package for Hanford Assessments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thorne, Paul D.; Bergeron, Marcel P.; Williams, Mark D.

    2006-01-31

    This report presents data and interpreted information that supports the groundwater module of the System Assessment Capability (SAC) used in Hanford Assessments. The objective of the groundwater module is to predict movement of radioactive and chemical contaminants through the aquifer to the Columbia River or other potential discharge locations. This data package is being revised as part of the deliverables under the Characterization of Systems Project (#49139) aimed at providing documentation for assessments being conducted under the Hanford Assessments Project (#47042). Both of these projects are components of the Groundwater Remediation and Closure Assessments Projects, managed by the Management andmore » Integration Project (#47043).« less

  10. Program Management Tool

    NASA Technical Reports Server (NTRS)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

  11. Aerosol Microphysics and Radiation Integration

    DTIC Science & Technology

    2005-09-30

    www.nrlmry.navy.mil/ flambe / LONG-TERM GOALS This long-term goals of this project is the development of systems that support real time global... FLAMBE ) project is currently being utilized by Internet Community, Air quality/human health research (University of Kansas Medical Center), Environment

  12. Integrated Docking Simulation and Testing with the Johnson Space Center Six-Degree of Freedom Dynamic Test System

    NASA Technical Reports Server (NTRS)

    Mitchell, Jennifer D.; Cryan, Scott P.; Baker, Kenneth; Martin, Toby; Goode, Robert; Key, Kevin W.; Manning, Thomas; Chien, Chiun-Hong

    2008-01-01

    The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, AR&D). The crewed versions may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Constellation Program; this is carried as one of the CEV Project top risks. The Exploration Technology Development Program (ETDP) AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation. One of the project activities is a series of "pathfinder" testing and simulation activities to integrate relative navigation sensors with the Johnson Space Center Six-Degree-of-Freedom Test System (SDTS). The SDTS will be the primary testing location for the Orion spacecraft s Low Impact Docking System (LIDS). Project team members have integrated the Orion simulation with the SDTS computer system so that real-time closed loop testing can be performed with relative navigation sensors and the docking system in the loop during docking and undocking scenarios. Two relative navigation sensors are being used as part of a "pathfinder" activity in order to pave the way for future testing with the actual Orion sensors. This paper describes the test configuration and test results.

  13. Development and Test of Robotically Assisted Extravehicular Activity Gloves

    NASA Technical Reports Server (NTRS)

    Rogers, Jonathan M.; Peters, Benjamin J.; Laske, Evan A.; McBryan, Emily R.

    2017-01-01

    Over the past two years, the High Performance EVA Glove (HPEG) project under NASA's Space Technology Mission Directorate (STMD) funded an effort to develop an electromechanically-assisted space suit glove. The project was a collaboration between the Johnson Space Center's Software, Robotics, and Simulation Division and the Crew and Thermal Systems division. The project sought to combine finger actuator technology developed for Robonaut 2 with the softgoods from the ILC Phase VI EVA glove. The Space Suit RoboGlove (SSRG) uses a system of three linear actuators to pull synthetic tendons attached to the glove's fingers to augment flexion of the user's fingers. To detect the user's inputs, the system utilizes a combination of string potentiometers along the back of the fingers and force sensitive resistors integrated into the fingertips of the glove cover layer. This paper discusses the development process from initial concepts through two major phases of prototypes, and the results of initial human testing. Initial work on the project focused on creating a functioning proof of concept, designing the softgoods integration, and demonstrating augmented grip strength with the actuators. The second year of the project focused on upgrading the actuators, sensors, and software with the overall goal of creating a system that moves with the user's fingers in order to reduce fatigue associated with the operation of a pressurized glove system. This paper also discusses considerations for a flight system based on this prototype development and address where further work is required to mature the technology.

  14. Flood Warning and Forecasting System in Slovakia

    NASA Astrophysics Data System (ADS)

    Leskova, Danica

    2016-04-01

    In 2015, it finished project Flood Warning and Forecasting System (POVAPSYS) as part of the flood protection in Slovakia till 2010. The aim was to build POVAPSYS integrated computerized flood forecasting and warning system. It took a qualitatively higher level of output meteorological and hydrological services in case of floods affecting large territorial units, as well as local flood events. It is further unfolding demands on performance and coordination of meteorological and hydrological services, troubleshooting observation, evaluation of data, fast communication, modeling and forecasting of meteorological and hydrological processes. Integration of all information entering and exiting to and from the project POVAPSYS provides Hydrological Flood Forecasting System (HYPOS). The system provides information on the current hydrometeorological situation and its evolution with the generation of alerts and notifications in case of exceeding predefined thresholds. HYPOS's functioning of the system requires flawless operability in critical situations while minimizing the loss of its key parts. HYPOS is a core part of the project POVAPSYS, it is a comprehensive software solutions based on a modular principle, providing data and processed information including alarms, in real time. In order to achieve full functionality of the system, in proposal, we have put emphasis on reliability, robustness, availability and security.

  15. Final Report: Towards an Emergent Model of Technology Adoption for Accelerating the Diffusion of Residential Solar PV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rai, Varun

    This project sought to enable electric utilities in Texas to accelerate diffusion of residential solar photovoltaic (PV) by systematically identifying and targeting existing barriers to PV adoption. A core goal of the project was to develop an integrated research framework that combines survey research, econometric modeling, financial modeling, and implementation and evaluation of pilot projects to study the PV diffusion system. This project considered PV diffusion as an emergent system, with attention to the interactions between the constituent parts of the PV socio-technical system including: economics of individual decision-making; peer and social influences; behavioral responses; and information and transaction costs.more » We also conducted two pilot projects, which have yielded new insights into behavioral and informational aspects of PV adoption. Finally, this project has produced robust and generalizable results that will provide deeper insights into the technology-diffusion process that will be applicable for the design of utility programs for other technologies such as home-energy management systems and plug-in electric vehicles. When we started this project in 2013 there was little systematic research on characterizing the decision-making process of households interested in adopting PV. This project was designed to fill that research gap by analyzing the PV adoption process from the consumers' decision-making perspective and with the objective to systematically identifying and addressing the barriers that consumers face in the adoption of PV. The two key components of that decision-making process are consumers' evaluation of: (i) uncertainties and non-monetary costs associated with the technology and (ii) the direct monetary cost-benefit. This project used an integrated approach to study both the non-monetary and the monetary components of the consumer decision-making process.« less

  16. Design and Test of a Liquid Oxygen / Liquid Methane Thruster with Cold Helium Pressurization Heat Exchanger

    NASA Technical Reports Server (NTRS)

    Melcher, John C.; Morehead, Robert L.; Atwell, Matthew J.; Hurlbert, Eric A.

    2015-01-01

    A liquid oxygen / liquid methane 2,000 lbf thruster was designed and tested in conjuction with a nozzle heat exchanger for cold helium pressurization. Cold helium pressurization systems offer significant spacecraft vehicle dry mass savings since the pressurant tank size can be reduced as the pressurant density is increased. A heat exchanger can be incorporated into the main engine design to provide expansion of the pressurant supply to the propellant tanks. In order to study the systems integration of a cold-helium pressurization system, a 2,000 lbf thruster with a nozzle heat exchanger was designed for integration into the Project Morpheus vehicle at NASA Johnson Space Center. The testing goals were to demonstrate helium loading and initial conditioning to low temperatures, high-pressure/low temperature storage, expansion through the main engine heat exchanger, and propellant tank injection/pressurization. The helium pressurant tank was an existing 19 inch diameter composite-overwrap tank, and the targert conditions were 4500 psi and -250 F, providing a 2:1 density advantage compared to room tempatrue storage. The thruster design uses like-on-like doublets in the injector pattern largely based on Project Morpheus main engine hertiage data, and the combustion chamber was designed for an ablative chamber. The heat exchanger was installed at the ablative nozzle exit plane. Stand-alone engine testing was conducted at NASA Stennis Space Center, including copper heat-sink chambers and highly-instrumented spoolpieces in order to study engine performance, stability, and wall heat flux. A one-dimensional thermal model of the integrated system was completed. System integration into the Project Morpheus vehicle is complete, and systems demonstrations will follow.

  17. Equidistant map projections of a triaxial ellipsoid with the use of reduced coordinates

    NASA Astrophysics Data System (ADS)

    Pędzich, Paweł

    2017-12-01

    The paper presents a new method of constructing equidistant map projections of a triaxial ellipsoid as a function of reduced coordinates. Equations for x and y coordinates are expressed with the use of the normal elliptic integral of the second kind and Jacobian elliptic functions. This solution allows to use common known and widely described in literature methods of solving such integrals and functions. The main advantage of this method is the fact that the calculations of x and y coordinates are practically based on a single algorithm that is required to solve the elliptic integral of the second kind. Equations are provided for three types of map projections: cylindrical, azimuthal and pseudocylindrical. These types of projections are often used in planetary cartography for presentation of entire and polar regions of extraterrestrial objects. The paper also contains equations for the calculation of the length of a meridian and a parallel of a triaxial ellipsoid in reduced coordinates. Moreover, graticules of three coordinates systems (planetographic, planetocentric and reduced) in developed map projections are presented. The basic properties of developed map projections are also described. The obtained map projections may be applied in planetary cartography in order to create maps of extraterrestrial objects.

  18. Management tools for R&D engineering projects: Coordination perspective for large international consortium (NeXOS)

    NASA Astrophysics Data System (ADS)

    Castro, Ayoze; Memè, Simone; Quevedo, Eduardo; Waldmann, Christoph; Pearlman, Jay; Delory, Eric; Llinás, Octavio

    2017-04-01

    NeXOS is a cross-functional and multidisciplinary project funded under the EU FP7 Program, which involves 21 organizations from six different European countries. They all have different backgrounds, interests, business models and perspectives. To be successful, NeXOS applied an international recognized management methodology tailored to the specific project's environment and conditions, with an explicit structure based on defined roles and responsibilities for the people involved in the project and a means for effective communication between them (Fig.1). The project, divided in four different stages of requirements, design, integration, validation and demonstration, allows a clearer monitor of its progress, a comparison of the level of achievement in accordance with the plan and an earlier detection of problems/issues, leading to implementation of less disruptive, but still effective corrective actions. NeXOS is following an ambitious plan to develop innovative sensor systems with a high degree of modularity and interoperability, starting with requirements definition through validation and demonstration phase. To make this integrative approach possible, a management development strategy has been used incorporating systems engineering methods (Fig.2). Although this is standard practice in software development and large scale systems such as aircraft production, it is still new in the ocean hardware business and therefore NeXOS was a test case for this development concept. The question is one of scale as ocean observation systems are typically built on the scale of a few with co-located teams. With a system of diverse technologies (optical, acoustic, platform interfaces), there are cultural differences that must be bridged. The greatest challenge is in the implementation and the willingness of different teams to work with an engineering process, which may help ultimate system integration, but may place additional burdens on individual participants. This presentation will address approaches for effective operations in this environment.

  19. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    NASA Astrophysics Data System (ADS)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  20. Integrated response toward HIV: a health promotion case study from China.

    PubMed

    Jiang, Zhen; Wang, Debin; Yang, Sen; Duan, Mingyue; Bu, Pengbin; Green, Andrew; Zhang, Xuejun

    2011-06-01

    Integrated HIV response refers to a formalized, collaborative process among organizations in communities with HIV at-risk populations. It is a both comprehensive and flexible scheme, which may include community-based environment promotion, skill coalition, fund linkage, human resource collaboration and service system jointly for both HIV prevention and control. It enables decisions and actions responds over time. In 1997, the Chinese government developed a 10-year HIV project supported by World Bank Loan (H9-HIV/AIDS/STIs). It was the first integrated STI/HIV intervention project in China and provides a unique opportunity to explore the long-term comprehensive STI/HIV intervention in a low-middle income country setting. Significant outcomes were identified as development and promotion of the national strategic plan and its ongoing implementation; positive knowledge, behavioral and STI/HIV prevalence rate change; and valuable experiences for managing integrated HIV/STI intervention projects. Essential factors for the success of the project and the key tasks for the next step were identified and included well-designed intervention in rural and low economic regions, unified program evaluation framework and real-time information collection and assessment.

  1. From industry to academia: Benefits of integrating a professional project management standard into (geo)science research

    NASA Astrophysics Data System (ADS)

    Cristini, Luisa

    2017-04-01

    Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.

  2. Jordan Water Project: an interdisciplinary evaluation of freshwater vulnerability and security

    NASA Astrophysics Data System (ADS)

    Gorelick, S.; Yoon, J.; Rajsekhar, D.; Muller, M. F.; Zhang, H.; Gawel, E.; Klauer, B.; Klassert, C. J. A.; Sigel, K.; Thilmant, A.; Avisse, N.; Lachaut, T.; Harou, J. J.; Knox, S.; Selby, P. D.; Mustafa, D.; Talozi, S.; Haddad, Y.; Shamekh, M.

    2016-12-01

    The Jordan Water Project, part of the Belmont Forum projects, is an interdisciplinary, international research effort focused on evaluation of freshwater security in Jordan, one of the most water-vulnerable countries in the world. The team covers hydrology, water resources systems analysis, economics, policy evaluation, geography, risk and remote sensing analyses, and model platform development. The entire project team communally engaged in construction of an integrated hydroeconomic model for water supply policy evaluation. To represent water demand and allocation behavior at multiple levels of decision making,the model integrates biophysical modules that simulate natural and engineered hydrologic phenomena with human behavioral modules. Hydrologic modules include spatially-distributed groundwater and surface-water models for the major aquifers and watersheds throughout Jordan. For the human modules, we adopt a multi-agent modeling approach to represent decision-making processes. The integrated model was developed in Pynsim, a new open-source, object-oriented platform in Python for network-based water resource systems. We continue to explore the impacts of future scenarios and interventions.This project had tremendous encouragement and data support from Jordan's Ministry of Water and Irrigation. Modeling technology is being transferred through a companion NSF/USAID PEER project awarded toJordan University of Science and Technology. Individual teams have also conducted a range of studies aimed at evaluating Jordanian and transboundary surface water and groundwater systems. Surveys, interviews, and econometric analyses enabled us to better understandthe behavior of urban households, farmers, private water resellers, water use pattern of the commercial sector and irrigation water user associations. We analyzed nationwide spatial and temporal statistical trends in rainfall, developed urban and national comparative metrics to quantify water supply vulnerability, improved remote sensing methods to estimate crop-water use, and evaluated the impacts of climate change on future drought severity.

  3. Total integrated performance excellence system (TIPES): A true north direction for a clinical trial support center.

    PubMed

    Sather, Mike R; Parsons, Sherry; Boardman, Kathy D; Warren, Stuart R; Davis-Karim, Anne; Griffin, Kevin; Betterton, Jane A; Jones, Mark S; Johnson, Stanley H; Vertrees, Julia E; Hickey, Jan H; Salazar, Thelma P; Huang, Grant D

    2018-03-01

    This paper presents the quality journey taken by a Federal organization over more than 20 years. These efforts have resulted in the implementation of a Total Integrated Performance Excellence System (TIPES) that combines key principles and practices of established quality systems. The Center has progressively integrated quality system frameworks including the Malcom Baldrige National Quality Award (MBNQA) Framework and Criteria for Performance Excellence, ISO 9001, and the Organizational Project Management Maturity Model (OPM3), as well as supplemental quality systems of ISO 15378 (packaging for medicinal products) and ISO 21500 (guide to project management) to systematically improve all areas of operations. These frameworks were selected for applicability to Center processes and systems, consistency and reinforcement of complimentary approaches, and international acceptance. External validations include the MBNQA, the highest quality award in the US, continued registration and conformance to ISO standards and guidelines, and multiple VA and state awards. With a focus on a holistic approach to quality involving processes, systems and personnel, this paper presents activities and lessons that were critical to building TIPES and establishing the quality environment for conducting clinical research in support of Veterans and national health care.

  4. RAILROAD DIGITAL LINE GRAPHS FOR THE MID-ATLANTIC INTEGRATED ASSESSMENT (MAIA) STUDY AREA

    EPA Science Inventory

    This data set is a geographic information system (GIS) coverage of railroads for the United States Environmental Protection Agency (USEPA) Mid-Atlantic Integrated Assessment (MAIA) Project region. The coverage was produced using US Geological Survey transportation digital line ...

  5. Integrating meso- and micro-simulation models to evaluate traffic management strategies - year 1 : final report.

    DOT National Transportation Integrated Search

    2016-06-01

    In this project the researchers developed a hierarchical multi-resolution traffic simulation system for metropolitan areas, referred to as MetroSim. Categorically, the focus is on integrating two types of simulation: microscopic simulation in which i...

  6. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Current and advanced act control system definition study. Volume 2: Appendices

    NASA Technical Reports Server (NTRS)

    Hanks, G. W.; Shomber, H. A.; Dethman, H. A.; Gratzer, L. B.; Maeshiro, A.; Gangsaas, D.; Blight, J. D.; Buchan, S. M.; Crumb, C. B.; Dorwart, R. J.

    1981-01-01

    The current status of the Active Controls Technology (ACT) for the advanced subsonic transport project is investigated through analysis of the systems technical data. Control systems technologies under examination include computerized reliability analysis, pitch axis fly by wire actuator, flaperon actuation system design trade study, control law synthesis and analysis, flutter mode control and gust load alleviation analysis, and implementation of alternative ACT systems. Extensive analysis of the computer techniques involved in each system is included.

  7. The SMART-NAS Testbed

    NASA Technical Reports Server (NTRS)

    Aquilina, Rudolph A.

    2015-01-01

    The SMART-NAS Testbed for Safe Trajectory Based Operations Project will deliver an evaluation capability, critical to the ATM community, allowing full NextGen and beyond-NextGen concepts to be assessed and developed. To meet this objective a strong focus will be placed on concept integration and validation to enable a gate-to-gate trajectory-based system capability that satisfies a full vision for NextGen. The SMART-NAS for Safe TBO Project consists of six sub-projects. Three of the sub-projects are focused on exploring and developing technologies, concepts and models for evolving and transforming air traffic management operations in the ATM+2 time horizon, while the remaining three sub-projects are focused on developing the tools and capabilities needed for testing these advanced concepts. Function Allocation, Networked Air Traffic Management and Trajectory Based Operations are developing concepts and models. SMART-NAS Test-bed, System Assurance Technologies and Real-time Safety Modeling are developing the tools and capabilities to test these concepts. Simulation and modeling capabilities will include the ability to assess multiple operational scenarios of the national airspace system, accept data feeds, allowing shadowing of actual operations in either real-time, fast-time and/or hybrid modes of operations in distributed environments, and enable integrated examinations of concepts, algorithms, technologies, and NAS architectures. An important focus within this project is to enable the development of a real-time, system-wide safety assurance system. The basis of such a system is a continuum of information acquisition, analysis, and assessment that enables awareness and corrective action to detect and mitigate potential threats to continuous system-wide safety at all levels. This process, which currently can only be done post operations, will be driven towards "real-time" assessments in the 2035 time frame.

  8. Building the Sun4Cast System: Improvements in Solar Power Forecasting

    DOE PAGES

    Haupt, Sue Ellen; Kosovic, Branko; Jensen, Tara; ...

    2017-06-16

    The Sun4Cast System results from a research-to-operations project built on a value chain approach, and benefiting electric utilities’ customers, society, and the environment by improving state-of-the-science solar power forecasting capabilities. As integration of solar power into the national electric grid rapidly increases, it becomes imperative to improve forecasting of this highly variable renewable resource. Thus, a team of researchers from public, private, and academic sectors partnered to develop and assess a new solar power forecasting system, Sun4Cast. The partnership focused on improving decision-making for utilities and independent system operators, ultimately resulting in improved grid stability and cost savings for consumers.more » The project followed a value chain approach to determine key research and technology needs to reach desired results. Sun4Cast integrates various forecasting technologies across a spectrum of temporal and spatial scales to predict surface solar irradiance. Anchoring the system is WRF-Solar, a version of the Weather Research and Forecasting (WRF) numerical weather prediction (NWP) model optimized for solar irradiance prediction. Forecasts from multiple NWP models are blended via the Dynamic Integrated Forecast (DICast) System, the basis of the system beyond about 6 h. For short-range (0-6 h) forecasts, Sun4Cast leverages several observation-based nowcasting technologies. These technologies are blended via the Nowcasting Expert System Integrator (NESI). The NESI and DICast systems are subsequently blended to produce short to mid-term irradiance forecasts for solar array locations. The irradiance forecasts are translated into power with uncertainties quantified using an analog ensemble approach, and are provided to the industry partners for real-time decision-making. The Sun4Cast system ran operationally throughout 2015 and results were assessed. As a result, this paper analyzes the collaborative design process, discusses the project results, and provides recommendations for best-practice solar forecasting.« less

  9. Building the Sun4Cast System: Improvements in Solar Power Forecasting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haupt, Sue Ellen; Kosovic, Branko; Jensen, Tara

    The Sun4Cast System results from a research-to-operations project built on a value chain approach, and benefiting electric utilities’ customers, society, and the environment by improving state-of-the-science solar power forecasting capabilities. As integration of solar power into the national electric grid rapidly increases, it becomes imperative to improve forecasting of this highly variable renewable resource. Thus, a team of researchers from public, private, and academic sectors partnered to develop and assess a new solar power forecasting system, Sun4Cast. The partnership focused on improving decision-making for utilities and independent system operators, ultimately resulting in improved grid stability and cost savings for consumers.more » The project followed a value chain approach to determine key research and technology needs to reach desired results. Sun4Cast integrates various forecasting technologies across a spectrum of temporal and spatial scales to predict surface solar irradiance. Anchoring the system is WRF-Solar, a version of the Weather Research and Forecasting (WRF) numerical weather prediction (NWP) model optimized for solar irradiance prediction. Forecasts from multiple NWP models are blended via the Dynamic Integrated Forecast (DICast) System, the basis of the system beyond about 6 h. For short-range (0-6 h) forecasts, Sun4Cast leverages several observation-based nowcasting technologies. These technologies are blended via the Nowcasting Expert System Integrator (NESI). The NESI and DICast systems are subsequently blended to produce short to mid-term irradiance forecasts for solar array locations. The irradiance forecasts are translated into power with uncertainties quantified using an analog ensemble approach, and are provided to the industry partners for real-time decision-making. The Sun4Cast system ran operationally throughout 2015 and results were assessed. As a result, this paper analyzes the collaborative design process, discusses the project results, and provides recommendations for best-practice solar forecasting.« less

  10. Energy Systems Integration Partnerships: NREL + Cogent Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berdahl, Sonja E

    2017-08-09

    NREL is collaborating with Cogent Energy Systems (Cogent) to introduce small-scale waste-to-energy technology in microgrids.The focus of the project is to test and demonstrate the feasibility, reliability, and usefulness of integrating electricity generated using a simulated syngas composition matching the syngas stream to be produced by a HelioStorm-based WTE gasifier to power a microgrid as a means of addressing and complementing the intermittency of other sources of electricity.

  11. High resolution projection micro stereolithography system and method

    DOEpatents

    Spadaccini, Christopher M.; Farquar, George; Weisgraber, Todd; Gemberling, Steven; Fang, Nicholas; Xu, Jun; Alonso, Matthew; Lee, Howon

    2016-11-15

    A high-resolution P.mu.SL system and method incorporating one or more of the following features with a standard P.mu.SL system using a SLM projected digital image to form components in a stereolithographic bath: a far-field superlens for producing sub-diffraction-limited features, multiple spatial light modulators (SLM) to generate spatially-controlled three-dimensional interference holograms with nanoscale features, and the integration of microfluidic components into the resin bath of a P.mu.SL system to fabricate microstructures of different materials.

  12. Systems engineering management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the operation of freeways, arterials, and public transit. The system will be shared between information system...

  13. Integrated Radio and Optical Communication (iROC)

    NASA Technical Reports Server (NTRS)

    Raible, Daniel; Romanofsky, Robert; Pease, Gary; Kacpura, Thomas

    2016-01-01

    This is an overview of the Integrated Radio and Optical Communication (iROC) Project for Space Communication and Navigation Industry Days. The Goal is to develop and demonstrate new, high payoff space technologies that will promote mission utilization of optical communications, thereby expanding the capabilities of NASA's exploration, science, and discovery missions. This is an overview that combines the paramount features of select deep space RF and optical communications elements into an integrated system, scalable from deep space to near earth. It will realize Ka-band RF and 1550 nanometer optical capability. The approach is to prototype and demonstrate performance of key components to increase to TRL-5, leading to integrated hybrid communications system demonstration to increase to TRL-5, leading to integrated hybrid communications system demonstration.

  14. Integration of Earth System Models and Workflow Management under iRODS for the Northeast Regional Earth System Modeling Project

    NASA Astrophysics Data System (ADS)

    Lengyel, F.; Yang, P.; Rosenzweig, B.; Vorosmarty, C. J.

    2012-12-01

    The Northeast Regional Earth System Model (NE-RESM, NSF Award #1049181) integrates weather research and forecasting models, terrestrial and aquatic ecosystem models, a water balance/transport model, and mesoscale and energy systems input-out economic models developed by interdisciplinary research team from academia and government with expertise in physics, biogeochemistry, engineering, energy, economics, and policy. NE-RESM is intended to forecast the implications of planning decisions on the region's environment, ecosystem services, energy systems and economy through the 21st century. Integration of model components and the development of cyberinfrastructure for interacting with the system is facilitated with the integrated Rule Oriented Data System (iRODS), a distributed data grid that provides archival storage with metadata facilities and a rule-based workflow engine for automating and auditing scientific workflows.

  15. Some Good Practices for Integration and Outreach and their Implementation in the Community Integrated Assessment System (CIAS) and its associated web portal CLIMASCOPE

    NASA Astrophysics Data System (ADS)

    Warren, R. F.; Price, J. T.; Goswami, S.

    2010-12-01

    Successful communication of knowledge to climate change policy makers requires the careful integration of scientific knowledge in an integrated assessment that can be clearly communicated to stakeholders, and which encapsulates the uncertainties in the analysis and conveys the need for using a risk assessment approach. It is important that (i) the system is co-designed with the users (ii) relevant disciplines are included (iii) assumptions made are clear (iv) the robustness of outputs to uncertainties is demonstrated (v) the system is flexible so that it can keep up with changing stakeholder needs and (vi) the results are communicated clearly and are readily accessible. The “Community Integrated Assessment System” (CIAS) is a unique multi-institutional, modular, and flexible integrated assessment system for modeling climate change which fulfils the above six criteria. It differs from other integrated models in being a flexible system allowing various combinations of component modules, to be connected together into alternative integrated assessment models. These modules may be written at different institutions in different computer languages and/or based on different operating systems. Scientists are able determine which particular CIAS coupled model they wish to use through a web portal. This includes the facility to implement Latin hypercube experimental design facilitating formal uncertainty analysis. Further exploration of robustness is possible through the ability to select, for example, alternative hyrdrological or climate models to address the same questions. It has been applied to study future scenarios of climate change mitigation, through for example the AVOIDing dangerous climate change project for DEFRA, in which the avoided impacts (benefits) of alternative climate policies were compared to no-policy baselines. These highlight the potential for mitigation to remove a substantial fraction of the climate change impacts that would otherwise occur; but also show that is not possible to avoid all the impacts, and hence that adaptation will still be required. For example, this has been shown for projections of future European drought. CIAS has also been used for analyses used in the IPCC 4AR and the Stern review. Recent applications include a study of the role of avoided deforestation in climate mitigation, and a study of the impacts of climate change on biodiversity. A second web portal, CLIMASCOPE, is being developed for use by stakeholders, currently focusing on the needs of adaptation planners. This will benefit communication by allowing a wide range of users free access to regional climate change projections in simple manner, yet one which encourages risk assessment through encapsulation of the uncertainties in climate change projection. Examples of CLIMASCOPE output that is being made available to stakeholders will be shown.

  16. Competing power-generating technologies for the 21st century

    NASA Astrophysics Data System (ADS)

    Troost, G. K.

    1994-04-01

    Several new and advanced power-generating systems are presently being developed, e.g., fuel cells, advanced heat pumps, high-performance gas turbines. An analysis of these systems is presented and is based on projections of comparative studies and relevant trends. For advanced systems, a trade-off between efficiency gain and projected development cost is crucial. Projections for market conditions in the 21st century and, in particular, environmental issues are made in order to assess market-entry opportunities. Results from various case studies indicate challenging opportunities in process and metallurgical industries; several process-integrated configurations are being studied.

  17. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project

    NASA Technical Reports Server (NTRS)

    Shively, Jay

    2017-01-01

    Over the past 5 years, the UAS integration into the NAS project has worked to reduce technical barriers to integration. A major focus of this work has been in support of RTCA SC-228. This committee has recently published the first UAS integration minimum performance standards (MOPS). This work has spanned detect and avoid (DAA) as well as command and control comm datalinks. I will discuss DAA efforts with focus on the human systems work. I will discuss how automation was discussed and addressed within this context. ICAO stood up a remotely piloted aircraft systems (RPAS) panel in 2014. They have developed an RPAS manual and are now working to revise existing annexes and standards and recommended practices. The Human In The System (HITS) has worked to infuse human factors guidelines into those documents. I will discuss that effort as well as how ICAO has defined and address autonomy. There is a great deal of interest in the control of multiple vehicles by a single operator. The UAS EXCOM Science and Research Panel (SARP) is holding a workshop on this topic in late June. I will discuss research performed on this topic when I worked for the Army and on-going work within the division and a NATO working group on Human-Autonomy Teaming.

  18. Developing a tool for mapping adult mental health care provision in Europe: the REMAST research protocol and its contribution to better integrated care

    PubMed Central

    Amaddeo, Francesco; Gutiérrez-Colosía, Mencia R.; Salazzari, Damiano; Gonzalez-Caballero, Juan Luis; Montagni, Ilaria; Tedeschi, Federico; Cetrano, Gaia; Chevreul, Karine; Kalseth, Jorid; Hagmair, Gisela; Straßmayr, Christa; Park, A-La; Sfetcu, Raluca; Wahlbeck, Kristian; Garcia-Alonso, Carlos

    2015-01-01

    Introduction Mental health care is a critical area to better understand integrated care and to pilot the different components of the integrated care model. However, there is an urgent need for better tools to compare and understand the context of integrated mental health care in Europe. Method The REMAST tool (REFINEMENT MApping Services Tool) combines a series of standardised health service research instruments and geographical information systems (GIS) to develop local atlases of mental health care from the perspective of horizontal and vertical integrated care. It contains five main sections: (a) Population Data; (b) the Verona Socio-economic Status (SES) Index; (c) the Mental Health System Checklist; (d) the Mental Health Services Inventory using the DESDE-LTC instrument; and (e) Geographical Data. Expected results The REMAST tool facilitates context analysis in mental health by providing the comparative rates of mental health service provision according to the availability of main types of care; care placement capacity; workforce capacity; and geographical accessibility to services in the local areas in eight study areas in Austria, England, Finland, France, Italy, Norway, Romania and Spain. Discussion The outcomes of this project will facilitate cooperative work and knowledge transfer on mental health care to the different agencies involved in mental health planning and provision. This project would improve the information to users and society on the available resources for mental health care and system thinking at the local level by the different stakeholders. The techniques used in this project and the knowledge generated could eventually be transferred to the mapping of other fields of integrated care. PMID:27118959

  19. Preliminary results from the High Speed Airframe Integration Research project

    NASA Technical Reports Server (NTRS)

    Coen, Peter G.; Sobieszczanski-Sobieski, Jaroslaw; Dollyhigh, Samuel M.

    1992-01-01

    A review is presented of the accomplishment of the near term objectives of developing an analysis system and optimization methods during the first year of the NASA Langley High Speed Airframe Integration Research (HiSAIR) project. The characteristics of a Mach 3 HSCT transport have been analyzed utilizing the newly developed process. In addition to showing more detailed information about the aerodynamic and structural coupling for this type of vehicle, this exercise aided in further refining the data requirements for the analysis process.

  20. Report on Integration of Existing Grid Models for N-R HES Interaction Focused on Balancing Authorities for Sub-hour Penalties and Opportunities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McJunkin, Timothy; Epiney, Aaron; Rabiti, Cristian

    2017-06-01

    This report provides a summary of the effort in the Nuclear-Renewable Hybrid Energy System (N-R HES) project on the level 4 milestone to consider integration of existing grid models into the factors for optimization on shorter time intervals than the existing electric grid models with the Risk Analysis Virtual Environment (RAVEN) and Modelica [1] optimizations and economic analysis that are the focus of the project to date.

Top