5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2012 CFR
2012-07-01
... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...
Design and realization of high quality prime farmland planning and management information system
NASA Astrophysics Data System (ADS)
Li, Manchun; Liu, Guohong; Liu, Yongxue; Jiang, Zhixin
2007-06-01
The article discusses the design and realization of a high quality prime farmland planning and management information system based on SDSS. Models in concept integration, management planning are used in High Quality Prime Farmland Planning in order to refine the current model system and the management information system is deigned with a triangular structure. Finally an example of Tonglu county high quality prime farmland planning and management information system is introduced.
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
Rhode Island congestion management plan : executive summary
DOT National Transportation Integrated Search
1997-09-01
This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...
Management Information System Based on the Balanced Scorecard
ERIC Educational Resources Information Center
Kettunen, Juha; Kantola, Ismo
2005-01-01
Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…
Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
A plan for structured management of the Systems Approach to Training (SAT) process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schurman, D.L.
1987-01-01
This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.
Guide to Developing an Environmental Management System - Plan
This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.
ERIC Educational Resources Information Center
1984
This report describes the North Carolina Department of Education's 5-year plan for establishing a statewide management information system. The system is intended to improve fiscal management, personnel administration, and administrative operations, and to ensure efficient resource use. Initial sections present highlights of the plan; background…
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
77 FR 44144 - National Forest System Land Management Planning; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendments. SUMMARY: The Department of Agriculture (USDA) published a National Forest System land management planning rule in the... document may be sent to the Director, Ecosystem Management Coordination Staff, USDA Forest Service, 1400...
Cost accounting, management control, and planning in health care.
Siegrist, R B; Blish, C S
1988-02-01
Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)
78 FR 13316 - National Forest System Land Management Planning Directives
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-27
... responsibilities. It should be used in conjunction with the FSH. FSH 1909.12--Land Management Planning Handbook... management planning. Forest Service Handbook 1909.15, section 31.12 (57 FR 43208; September 18, 1992... DEPARTMENT OF AGRICULTURE Forest Service RIN 0596-AD06 National Forest System Land Management...
SDDOT transportation systems management & operations program plan.
DOT National Transportation Integrated Search
2016-06-01
The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...
40 CFR 1.39 - Office of Policy, Planning and Evaluation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...
40 CFR 1.39 - Office of Policy, Planning and Evaluation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...
40 CFR 1.39 - Office of Policy, Planning and Evaluation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...
The importance of management information systems in a managed care environment.
Porro, M R; Brill, K R
1995-06-01
Keys to successful information systems for home care providers are planning and control. With managed care's emphasis on data, agencies need to have information systems that can handle the demands managed care puts on agencies today--planning before hurrying to install a system will ensure control as the managed care contracts add up.
DOT National Transportation Integrated Search
1974-02-01
The volume presents the plans for implementing the Satellite-Based Advanced Air Traffic Management System (SAATMS) described in Volumes II, III, and IV. Two plans are presented: an RDT&E plan and a transition plan. The RDT&E plan is presented as a se...
DOT National Transportation Integrated Search
1997-01-13
Management Advisory Memorandum on Resource Requirement Planning for Operating and Maintaining the National Airspace System (NAS) in the Federal Aviation Administration (FAA). Evaluates FAA's resource requirement planning system to ensure it accuratel...
A Case Study of the United States Navy’s Enterprise Resource Planning System
2006-06-01
incarnations, MRP-II added the capabilities of shop-floor management and distribution management activities. Later versions included the ability to manage ... finances , human resources, engineering, and project management. Enterprise Resource Planning systems were then developed as an integrated system
I-15 integrated corridor management system : project management plan.
DOT National Transportation Integrated Search
2011-06-01
The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...
50 CFR 80.81 - What must an agency submit when applying for a comprehensive-management-system grant?
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the agency's comprehensive management system including inventory, strategic plan, operational plan... for a comprehensive-management-system grant? 80.81 Section 80.81 Wildlife and Fisheries UNITED STATES... when applying for a comprehensive-management-system grant? A State fish and wildlife agency must submit...
NASA Astrophysics Data System (ADS)
Kouziokas, Georgios N.
2016-09-01
It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.
41 CFR 102-192.80 - How do we develop written security policies and plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...) Operating procedures; (d) Plan to provide a visible mail screening operation; (e) Training mail center...) Managing threats; (h) Communications plan; (i) Occupant Emergency Plan (OEP); (j) Continuity of Operations...
Advanced Air Traffic Management System Study Overview
DOT National Transportation Integrated Search
1975-06-01
This report summarizes the U.S. Department of Transportation study and development plans for the air traffic management system of the late 1980's and beyond. The plans are presented in the framework of an evolutionary system concept of traffic manage...
Advanced Air Traffic Management System Study : Executive Summary
DOT National Transportation Integrated Search
1975-01-01
This report summarizes the U.S. Department of Transportation study and development plans for the air traffic management system of the late 1980's and beyond. The plans are presented in the framework of an evolutionary system concept of traffic manage...
Advanced Air Traffic Management System Study - Technical Summary
DOT National Transportation Integrated Search
1975-03-01
This report summarizes the U.S. Department of Transportation study and development plans for the air traffic management system of the late 1980's and beyond. The plans are presented in the framework of an evolutionary system concept of traffic manage...
Underground storage tank management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-09-01
The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less
75 FR 9250 - Notice of Public Meeting, BLM-Alaska Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... Land Management, on a variety of planning and management issues associated with public land management.... Manager reports. Stimulus projects update. Alaska Land Information System. National Landscape Conservation System anniversary. Resource management planning. Other topics of interest to the RAC. All meetings are...
2017-09-18
Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement En vi ro nm en ta l L ab or at or y...Engineering Center-River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 396939, “Missouri River Recovery Management Plan and Environmental
The influence of enterprise resource planning (ERP) systems' performance on earnings management
NASA Astrophysics Data System (ADS)
Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei
2012-11-01
We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.
Space telescope observatory management system preliminary test and verification plan
NASA Technical Reports Server (NTRS)
Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.
1982-01-01
The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.
ERIC Educational Resources Information Center
Broering, Naomi C.; And Others
Strategic planning for an Integrated Academic Information Management System (IAIMS) for Georgetown University Medical Center is considered. The goal is to organize and transmit accessible and timely biomedical information where it is needed. Activities are proposed for education, research, patient care, management, sharing information on…
DOT National Transportation Integrated Search
1997-01-01
Prepared ca. 1997. The Configuration Management Plan (CMP) provides configuration management instructions and guidance for the Vessel Traffic Service (VTS) system of the Ports and Waterways Safety System (PAWSS) project. The CMP describes in detail t...
Code of Federal Regulations, 2011 CFR
2011-07-01
... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to... responsible for national planning. National planning includes the Forest Service national strategic plan...
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
49 CFR 236.18 - Software management control plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...
49 CFR 236.18 - Software management control plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...
49 CFR 236.18 - Software management control plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...
49 CFR 236.18 - Software management control plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...
49 CFR 236.18 - Software management control plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Software management control plan. 236.18 Section... Instructions: All Systems General § 236.18 Software management control plan. (a) Within 6 months of June 6, 2005, each railroad shall develop and adopt a software management control plan for its signal and train...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
36 CFR 219.4 - Identification and consideration of issues.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning The Framework for Planning... interested in or affected by National Forest System management; Presidential, Departmental, and Forest Service conservation leadership initiatives; cooperatively developed landscape goals (§ 219.12(b...
2014-06-01
21 C . CMMS USE IN THE LCS PROGRAM ......................................................22 D. CBM+ MAINTENANCE MANAGEMENT SYSTEM...45 b. Plan Maintenance Budgeting .................................................45 c . Plan Maintenance Logistics... Maintenance Planning ...................................46 b. Communicate Maintenance Budget .......................................46 c . Communicate
Strategic planning for health care management information systems.
Rosenberger, H R; Kaiser, K M
1985-01-01
Using a planning methodology and a structured design technique for analyzing data and data flow, information requirements can be derived to produce a strategic plan for a management information system. Such a long-range plan classifies information groups and assigns them priorities according to the goals of the organization. The approach emphasizes user involvement.
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Management Information System Project.
ERIC Educational Resources Information Center
Foley, Walter J.; Harr, Gordon G.
The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Vehicle management and mission planning systems with shuttle applications
NASA Technical Reports Server (NTRS)
1972-01-01
A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.
Opportunities for energy conservation in transportation planning and systems management.
DOT National Transportation Integrated Search
1978-01-01
This report is a summary, based primarily on a literature review, of the energy-savings potential of the elements in the transportation planning process and systems management. Within the scope of long-range planning, the energy aspects of land use a...
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
36 CFR 219.7 - Plan decisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Forest System Land and Resource Management Planning The Framework for Planning § 219.7 Plan decisions... the Forest Service national strategic plan to specific national forests and grasslands. While plan... management actions necessary for the achievement of desired conditions and objectives and compliance with...
36 CFR 219.7 - Plan decisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Forest System Land and Resource Management Planning The Framework for Planning § 219.7 Plan decisions... the Forest Service national strategic plan to specific national forests and grasslands. While plan... management actions necessary for the achievement of desired conditions and objectives and compliance with...
DOT National Transportation Integrated Search
2015-12-01
The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
77 FR 60107 - National Estuarine Research Reserve System
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Estuarine Research... Research Reserve Management Plan Revisions. SUMMARY: Notice is hereby given that the Estuarine Reserves..., Alaska National Estuarine Research Reserve Management Plan Revisions. The revised management plans...
NASA Astrophysics Data System (ADS)
Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun
2008-12-01
In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.
Presbyterian Healthcare Services: New Mexico's managed care leader.
Matheny de Guzman, M
1998-01-01
In 1997, PHS enhanced its presence in the managed care market by adding a large HMO to its health plan and snagging the largest part of state Medicaid managed care contracts. The health plan, once the source of only 15% of the system's revenue, is fast becoming the dominate component of the healthcare delivery system--a source of discontent for those who liked the old system. Find out the strategy behind these changes and plans for the future.
Systematic Planning for Educational Facilities.
ERIC Educational Resources Information Center
McGuffey, Carroll W.
This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…
36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Consistency with plans... plans, environmental standards, and other management requirements. The disposal of special forest products from National Forest System lands shall be consistent with applicable land management plans. Each...
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
Oak Ridge Reservation Waste Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, J.W.
1995-02-01
This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.
Planning and Resource Management in an Intelligent Automated Power Management System
NASA Technical Reports Server (NTRS)
Morris, Robert A.
1991-01-01
Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.
Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCDANIEL, K.S.
1999-08-31
Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202... plans and the underlying management control systems, and it should formulate a plan to handle these...
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202... plans and the underlying management control systems, and it should formulate a plan to handle these...
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202... plans and the underlying management control systems, and it should formulate a plan to handle these...
Solid Waste Information and Tracking System Client Server Conversion Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
GLASSCOCK, J.A.
2000-02-10
The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion
Safe teleradiology: information assurance as project planning methodology
NASA Astrophysics Data System (ADS)
Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2003-05-01
This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.
Integrated Data & Analysis in Support of Informed and Transparent Decision Making
NASA Astrophysics Data System (ADS)
Guivetchi, K.
2012-12-01
The California Water Plan includes a framework for improving water reliability, environmental stewardship, and economic stability through two initiatives - integrated regional water management to make better use of local water sources by integrating multiple aspects of managing water and related resources; and maintaining and improving statewide water management systems. The Water Plan promotes ways to develop a common approach for data standards and for understanding, evaluating, and improving regional and statewide water management systems, and for common ways to evaluate and select from alternative management strategies and projects. The California Water Plan acknowledges that planning for the future is uncertain and that change will continue to occur. It is not possible to know for certain how population growth, land use decisions, water demand patterns, environmental conditions, the climate, and many other factors that affect water use and supply may change by 2050. To anticipate change, our approach to water management and planning for the future needs to consider and quantify uncertainty, risk, and sustainability. There is a critical need for information sharing and information management to support over-arching and long-term water policy decisions that cross-cut multiple programs across many organizations and provide a common and transparent understanding of water problems and solutions. Achieving integrated water management with multiple benefits requires a transparent description of dynamic linkages between water supply, flood management, water quality, land use, environmental water, and many other factors. Water Plan Update 2013 will include an analytical roadmap for improving data, analytical tools, and decision-support to advance integrated water management at statewide and regional scales. It will include recommendations for linking collaborative processes with technical enhancements, providing effective analytical tools, and improving and sharing data and information. Specifically, this includes achieving better integration and consistency with other planning activities; obtaining consensus on quantitative deliverables; building a common conceptual understanding of the water management system; developing common schematics of the water management system; establishing modeling protocols and standards; and improving transparency and exchange of Water Plan information.
NASA Technical Reports Server (NTRS)
Yao, S. S. (Principal Investigator)
1981-01-01
The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, T.; Brandt, C.; Calfee, J.
1994-03-01
The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less
Stakeholder Attitudes, Knowledge and Engagement in Local Road Systems Planning and Decision Making
DOT National Transportation Integrated Search
2017-10-01
Political and policy dynamics associated with local road systems planning, management, and financing merit special attention. This study: 1) analyzes stakeholder attitudes, knowledge, and engagement about financing for local road system management, t...
NASA Technical Reports Server (NTRS)
Ebersole, M. M.
1983-01-01
JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... adaptive management principles; and 18. The Economic Profile System will be used as one source of... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNMP01000 L16100000 DO0000] Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource Management Plan for the...
Code of Federal Regulations, 2010 CFR
2010-07-01
.... An interdisciplinary, collaborative approach to planning may be achieved by engaging the skills and... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to...
36 CFR 219.14 - Involvement of State and local governments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...
36 CFR 219.14 - Involvement of State and local governments.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.14 Involvement of State and local governments. The responsible official... coordination of resource management plans or programs. ...
Innovative applications of artificial intelligence
NASA Astrophysics Data System (ADS)
Schorr, Herbert; Rappaport, Alain
Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.
Management Information in Tertiary Institutions.
ERIC Educational Resources Information Center
Findlay, A. W.
1981-01-01
A college or university's management information system corresponds roughly to the institution's structure, with these elements in descending order in the hierarchy: policy and planning, a planning system, control and coordination, and typical operating systems (payroll, exams, scheduling, library, facilities assignments, and accounting…
DOE Office of Scientific and Technical Information (OSTI.GOV)
WHITE, D.A.
1999-12-29
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).
Information Systems for University Planning.
ERIC Educational Resources Information Center
Robinson, Robert J.
This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…
Congestion Management System Process Report
DOT National Transportation Integrated Search
1996-03-01
In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...
The strategic planning of health management information systems.
Smith, J
1995-01-01
This paper discusses the roles and functions of strategic planning of information systems in health services. It selects four specialised methodologies of strategic planning for analysis with respect to their applicability in the health field. It then examines the utilisation of information planning in case studies of three health organisations (two State departments of health and community services and one acute care institution). Issues arising from the analysis concern the planning process, the use to which plans are put, and implications for management.
Appendix X. ComField Information Management System.
ERIC Educational Resources Information Center
Coffin, Robert W.
This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…
Management by Objectives: A Tool for Accountability.
ERIC Educational Resources Information Center
Hopkins, Charles O.
Many management styles in business and education today are not efficient, however the system of Management By Objectives (MBO) is proving to be successful. An MBO system basically has three parts: plan, implement, and review. In the planning stage the organization's purpose is defined, a mission statement developed, goals set, and objectives…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holland, Robert C.
A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.
1982-05-14
Attachment 2 contains the reports and lessons learned which resulted from the Level II Weapon System Management activities. Attachment 3 contains the reports...and lessons learned which resulted from the Level III Weapon System Management activities. _____ r. Air Force Logistics Command Attn: Col. McConnell 2...May 14, 1982 Attachment 4 contains the plans and lessons learned which resulted from the RCC Evaluation activities. I am pleased to deliver these
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
ERIC Educational Resources Information Center
Nowrasteh, Daryush M.
This publication is designed to serve state-level planners interested in reviewing the key concepts of state planning and management systems. The compact nature of the review and its organization in guideline format should provide a ready reference for the practitioner seeking to develop and improve management systems for vocational education in…
Large shipyard enlists EMS control capabilities. [Energy management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-10-01
The energy management plan of the Ingalls Shipbuilding in Pascagoula, Mississippi, featuring computer technology, is described. An integral component of the plan is a plus 300-point energy management system with Phase II expansion envisaging to bring additional points under control Within the first ten months of operation, the system saved more than /89,763 in electricity costs alone.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burgard, K.G.
This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
NASA Technical Reports Server (NTRS)
Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte
1992-01-01
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.
The flight planning - flight management connection
NASA Technical Reports Server (NTRS)
Sorensen, J. A.
1984-01-01
Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.
NASCOM system development plan: System description, capabilities, and plans, FY 94-2
NASA Technical Reports Server (NTRS)
1994-01-01
The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.
San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition
NASA Technical Reports Server (NTRS)
Werth, L. F. (Principal Investigator)
1981-01-01
The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.
DOT National Transportation Integrated Search
1995-10-01
REAL-TIME TRAFFIC INFORMATION, ROUTE GUIDANCE, ROUTE PLANNING, INTELLIGENT VEHICLE INITIATIVE OR IVI ">">KEYWORDS: OPERATIONAL TESTS, TRAVTEK, ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS, ADVANCED TRAFFIC MANAGEMENT SYSTEMS OR ATMS, INTELLI...
Mehrtak, Mohamad; Vatankhah, Soodabeh; Delgoshaei, Bahram; Gholipour, Arian
2014-01-01
Background: Succession planning promotes the culture of private ownership, staff loyalty to the organization and develops organizational commitment, and increases organizational stability. The study was conducted to examine the status of succession planning in the Iranian health system in order to highlight the key concepts, provide new insight, and attract the attention of senior managers of the Ministry of Health and Medical Education to the importance of succession planning in achieving organizational goals. Methods: In a qualitative study with a framework analysis approach, semi-structured interviews were conducted with a sample selected using purposive and snowball sampling procedure. The MAXQDA-10 was used to apply the codes and manage the data. The codes were extracted using inductive and deductive methods. Results: Fourteen themes and six main subthemes were identified, including planning, organizational culture, system approach, competency model, career path, and senior managers. Our findings indicate a lack of succession planning in the Iranian health system. Conclusion: lack of succession planning could lead to inefficiency and ineffectiveness in health services provision. Implementation of succession planning could maximize human resources utilization. PMID:25168998
Mehrtak, Mohamad; Vatankhah, Soodabeh; Delgoshaei, Bahram; Gholipour, Arian
2014-05-30
Succession planning promotes the culture of private ownership, staff loyalty to the organization and develops organizational commitment, and increases organizational stability. The study was conducted to examine the status of succession planning in the Iranian health system in order to highlight the key concepts, provide new insight, and attract the attention of senior managers of the Ministry of Health and Medical Education to the importance of succession planning in achieving organizational goals. In a qualitative study with a framework analysis approach, semi-structured interviews were conducted with a sample selected using purposive and snowball sampling procedure. The MAXQDA-10 was used to apply the codes and manage the data. The codes were extracted using inductive and deductive methods. Fourteen themes and six main subthemes were identified, including planning, organizational culture, system approach, competency model, career path, and senior managers. Our findings indicate a lack of succession planning in the Iranian health system. lack of succession planning could lead to inefficiency and ineffectiveness in health services provision. Implementation of succession planning could maximize human resources utilization.
DOT National Transportation Integrated Search
2008-06-23
This document presents the notes taken at the USDOT Integrated Corridor Management (ICM) Transit Data Gaps for Rail Transit Systems Initial Planning Workshop. Different scenarios for handling increased demand on rail and bus transit systems are discu...
The planning and control of NASA programs and resources
NASA Technical Reports Server (NTRS)
1983-01-01
The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.
Perry J. Brown; B. L. Driver; Joseph K. Berry
1981-01-01
Recreation opportunity planning, which is being adopted by some land management agencies for recreation input to land management planning, is reviewed for its applicability to arid land situations. Particular attention is given to the inventory and analysis phases of the system and to what we have learned about its implementation during its development.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... Rivers system; management of wilderness characteristics; protection of resources important to maintaining a subsistence lifestyle; the importance of subsistence to local economies and traditional lifestyles... BLM-managed lands in the planning area for wilderness characteristics using criteria established by...
Strategic Planning Methodology for Financial Management in the Department of the Navy
1983-05-24
objectives for accounting and financial management systems improvement for the Department of the Navy (DON) and for developing DON policy for overall...Strategic Financial Management Plan, in which we have provided recommendations for improving the planning process. This wedge packet is intended to provide a
41 CFR 102-192.80 - How do we develop written security policies and plans?
Code of Federal Regulations, 2014 CFR
2014-01-01
... service and/or the Federal Protective Service to develop agency mail security policies and plans. The... written security policies and plans? 102-192.80 Section 102-192.80 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...
41 CFR 102-192.80 - How do we develop written security policies and plans?
Code of Federal Regulations, 2013 CFR
2013-07-01
... service and/or the Federal Protective Service to develop agency mail security policies and plans. The... written security policies and plans? 102-192.80 Section 102-192.80 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2014 CFR
2014-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.80 - How do we develop written security policies and plans?
Code of Federal Regulations, 2012 CFR
2012-01-01
... service and/or the Federal Protective Service to develop agency mail security policies and plans. The... written security policies and plans? 102-192.80 Section 102-192.80 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.80 - How do we develop written security policies and plans?
Code of Federal Regulations, 2011 CFR
2011-01-01
... service and/or the Federal Protective Service to develop agency mail security policies and plans. The... written security policies and plans? 102-192.80 Section 102-192.80 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2011 CFR
2011-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
41 CFR 102-192.70 - What security policies and plans must we have?
Code of Federal Regulations, 2012 CFR
2012-01-01
... and plans must we have? 102-192.70 Section 102-192.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS... plans must we have? (a) You must have a written mail security policy that applies throughout the agency...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and related multistate planning efforts; (3) Consider the concerns of Federal land management agencies.... (d) States may use any one or more of the management systems (in whole or in part) described in 23 CFR part 500. (e) States may apply asset management principles and techniques in establishing planning...
78 FR 77550 - Integrated Corridor Management Deployment Planning Grants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... of this program is to promote the integrated management and operations of the transportation system... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Integrated Corridor Management... the Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to...
ERIC Educational Resources Information Center
Eddison, Elizabeth B.
1989-01-01
This bibliographic essay reviews sources that aid in the planning and management aspects of local area networks. Areas covered include system components; basic vocabularies; planning issues, including needs assessment, peripheral sharing alternatives and costs; and management issues, including purchasing, operating systems, installation, network…
Urban Planning and Management Information Systems Analysis and Design Based on GIS
NASA Astrophysics Data System (ADS)
Xin, Wang
Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.
Integrating Personalized and Community Services for Mobile Travel Planning and Management
NASA Astrophysics Data System (ADS)
Yu, Chien-Chih
Personalized and community services have been noted as keys to enhance and facilitate e-tourism as well as mobile applications. This paper aims at proposing an integrated service framework for combining personalized and community functions to support mobile travel planning and management. Major mobile tourism related planning and decision support functions specified include personalized profile management, information search and notification, evaluation and recommendation, do-it-yourself planning and design, community and collaboration management, auction and negotiation, transaction and payment, as well as trip tracking and quality control. A system implementation process with an example prototype is also presented for illustrating the feasibility and effectiveness of the proposed system framework, process model, and development methodology.
Hoshin Kanri: a technique for strategic quality management.
Tennant, C; Roberts, P A
2000-01-01
This paper describes a technique for Strategic Quality Management (SQM), known as Hoshin Kanri, which has been operated as a management system in many Japanese companies since the 1960s. It represents a core aspect of Japanese companies' management systems, and is stated as: the means by which the overall control system and Total Quality Management (TQM) are deployed. Hoshin Kanri is not particularly unique in its concept of establishing and tracking individual goals and objectives, but the manner in which the objectives and the means to achieve them are developed and deployed is. The problem with applying the concept of Strategic Quality Management (SQM) using Hoshin Kanri, is that it can tend to challenge the traditional authoritarian strategic planning models, which have become the paradigms of modern business. Yet Hoshin Kanri provides an appropriate tool for declaration of the strategic vision for the business while integrating goals and targets in a single holistic model. There have been various adaptations of Hoshin Kanri to align the technique to Western thinking and management approaches, yet outside Japan its significance has gone largely unreported. It is proposed that Hoshin Kanri is an effective methodology for SQM, which has a number of benefits over the more conventional planning techniques. The benefits of Hoshin Kanri as a tool for Strategic Quality Management (SQM) compared to conventional planning systems include: integration of strategic objectives with tactical daily management, the application of the plan-do-check-act cycle to business process management, parallel planning and execution methodology, company wide approach, improvements in communication, increased consensus and buy-in to goal setting, and cross-functional-management integration.
NASA Astrophysics Data System (ADS)
Demyanova, O. V.; Andreeva, E. V.; Sibgatullina, D. R.; Kireeva-Karimova, A. M.; Gafurova, A. Y.; Zakirova, Ch S.
2018-05-01
ERP in a modern enterprise information system allowed optimizing internal business processes, reducing production costs and increasing the attractiveness of enterprises for investors. It is an important component of success in the competition and an important condition for attracting investments in the key sector of the state. A vivid example of these systems are enterprise information systems using the methodology of ERP (Enterprise Resource Planning - enterprise resource planning). ERP is an integrated set of methods, processes, technologies and tools. It is based on: supply chain management; advanced planning and scheduling; sales automation; tool responsible for configuring; final resource planning; intelligence business; OLAP technology; block e- Commerce; management of product data. The main purpose of ERP systems is the automation of interrelated processes of planning, accounting and management in key areas of the company. ERP systems are automated systems that effectively address complex problems, including optimal allocation of business resources, ensuring quick and efficient delivery of goods and services to the consumer. Knowledge embedded in ERP systems provided enterprise-wide automation to introduce the activities of all functional departments of the company as a single complex system. At the level of quality estimates, most managers understand that the implementations of ERP systems is a necessary and useful procedure. Assessment of the effectiveness of the information systems implementation is relevant.
Planning Systems. SPEC Kit 13.
ERIC Educational Resources Information Center
Association of Research Libraries, Washington, DC. Office of Management Studies.
This kit on planning systems updates a 1974 Management Studies Office Systems and Procedures Exchange Center (SPEC) kit in which developments in planning activities among Association of Research Libraries (ARL) were reviewed. At the time of the original study, in 1972, planning techniques and systems were a subject of much interest because rising…
48 CFR 2452.242-71 - Contract management system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...
Responsibility Center Management: An Assessment of RCM at IUPUI.
ERIC Educational Resources Information Center
Robbins, David L.; Rooney, Patrick Michael
1995-01-01
Indiana University-Purdue University at Indianapolis is the first public institution to implement Responsibility Center Management (RCM), a comprehensive decentralized, incentive-base financial management system. RCM has strengthened academic planning, budget management, general accountability, and multiyear fiscal planning. Organizational…
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…
ERIC Educational Resources Information Center
Salazar, LeRoy; And Others
This resource for trainers involved in irrigated agriculture training for Peace Corps volunteers consists of two parts: irrigation training manual and irrigation reference manual. The complete course should fully prepare volunteers serving as irrigation, specialists to plan, implement, evaluate and manage small-scale irrigation projects in arid,…
Choosing a Digital Asset Management System That's Right for You
ERIC Educational Resources Information Center
Kaplan, Deborah
2009-01-01
Planning is necessary in selecting the appropriate digital asset management system for your institution. Key issues one should consider in planning: the objects to be stored, where they come from, and how they will be accessed; the end users; and the needed staffing levels for system maintenance. During the development of the system requirements,…
1991-07-30
4 Management reviews, engineering and WBS -Spiral 0 -5 *Risk Management Planning -Spiral 0-5 ,41.- Unrelsi ugt .Proper initial planning -Spiral 0.1...Reusability issues for trusted systems are associated closely with maintenance issues. Reuse theory and practice for highly trusted systems will require
Space station power management and distribution
NASA Technical Reports Server (NTRS)
Teren, F.
1985-01-01
The power system architecture is presented by a series of schematics which illustrate the power management and distribution (PMAD) system at the component level, including converters, controllers, switchgear, rotary power transfer devices, power and data cables, remote power controllers, and load converters. Power distribution options, reference power management, and control strategy are also outlined. A summary of advanced development status and plans and an overview of system test plans are presented.
1988-09-01
Institute of Technology Air University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Systems Management Dexter R... management system software Diag/Prob Diagnosis and problem solving or problem finding GR Graphics software Int/Transp Interoperability and...language software Plan/D.S. Planning and decision support or decision making PM Program management software SC Systems for Command, Control, Communications
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
Policy implications in developing a land use management information systems
NASA Technical Reports Server (NTRS)
Landini, A. J.
1975-01-01
The current land use map for the city of Los Angeles was developed by the guesstimation process and provides single stage information for each level in the critical geographical hierarchy for land use planning management. Processing and incorporation of LANDSAT data in the land use information system requires special funding; however, computergraphic maps are able to provide a viable information system for city planning and management.
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
Zhang, Xiaodong; Huang, Gordon
2014-03-15
Waste management activities can release greenhouse gases (GHGs) to the atmosphere, intensifying global climate change. Mitigation of the associated GHG emissions is vital and should be considered within integrated municipal solid waste (MSW) management planning. In this study, a fuzzy possibilistic integer programming (FPIM) model has been developed for waste management facility expansion and waste flow allocation planning with consideration of GHG emission trading in an MSW management system. It can address the interrelationships between MSW management planning and GHG emission control. The scenario of total system GHG emission control is analyzed for reflecting the feature that GHG emission credits may be tradable. An interactive solution algorithm is used to solve the FPIM model based on the uncertainty-averse preferences of decision makers in terms of p-necessity level, which represents the certainty degree of the imprecise objective. The FPIM model has been applied to a hypothetical MSW planning problem, where optimal decision schemes for facility expansion and waste flow allocation have been achieved with consideration of GHG emission control. The results indicate that GHG emission credit trading can decrease total system cost through re-allocation of GHG emission credits within the entire MSW management system. This will be helpful for decision makers to effectively determine the allowable GHG emission permits in practices. Copyright © 2014 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-27
... System (NFS) lands; local, State, and Tribal governments who have an interest in the plan; Federal agencies with an interest in the management of NFS lands and resources; not-for-profit organizations interested in NFS management, such as environmental groups, recreation groups, educational institutions; and...
Nkengasong, John N; Mesele, Tsehaynesh; Orloff, Sherry; Kebede, Yenew; Fonjungo, Peter N; Timperi, Ralph; Birx, Deborah
2009-06-01
Medical laboratory services are an essential, yet often neglected, component of health systems in developing countries. Their central role in public health, disease control and surveillance, and patient management is often poorly recognized by governments and donors. However, medical laboratory services in developing countries can be strengthened by leveraging funding from other sources of HIV/AIDS prevention, care, surveillance, and treatment programs. Strengthening these services will require coordinated efforts by national governments and partners and can be achieved by establishing and implementing national laboratory strategic plans and policies that integrate laboratory systems to combat major infectious diseases. These plans should take into account policy, legal, and regulatory frameworks; the administrative and technical management structure of the laboratories; human resources and retention strategies; laboratory quality management systems; monitoring and evaluation systems; procurement and maintenance of equipment; and laboratory infrastructure enhancement. Several countries have developed or are in the process of developing their laboratory plans, and others, such as Ethiopia, have implemented and evaluated their plan.
2005-03-01
Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Air Force Geophysics Laboratory Management Information System Study.
1985-11-01
management information system (MIS) at AFGL. The study summarizes current management and administrative practices at AFGL. Requirements have been identified for automating several currently manual functions to compile accurate and timely information to better manage and plan AFGL programs. This document describes the functions and relative priorities of five MIS subsystems and provides suggestions for implementation solutions. Creation of a detailed Development Plan is recommended as the follow-on task.
NASA Technical Reports Server (NTRS)
Melcher, Kevin J.; Maul, William A.; Garg, Sanjay
2007-01-01
The constraints of future Exploration Missions will require unique integrated system health management capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays, all require an integrated approach to health management that can span distinct, yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation and support the Exploration Mission from beginning to end. Propulsion is a critical part of any space exploration mission, and monitoring the health of the propulsion system is an integral part of assuring mission safety and success. Health management is a somewhat ubiquitous technology that encompasses a large spectrum of physical components and logical processes. For this reason, it is essential to develop a systematic plan for propulsion health management system development. This paper provides a high-level perspective of propulsion health management systems, and describes a logical approach for the future planning and early development that are crucial to planned space exploration programs. It also presents an overall approach, or roadmap, for propulsion health management system development and a discussion of the associated roadblocks and challenges.
NASA Astrophysics Data System (ADS)
Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie
2008-10-01
During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.
Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2014-01-01
This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...
Using Executive Information Systems to Manage Capital Projects and Facilities.
ERIC Educational Resources Information Center
Kaynor, Robert
1993-01-01
In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Decision Support System (DSS) Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration....
FOCUS: a fire management planning system -- final report
Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey
1981-01-01
FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...
The Effects of Top Management Support on Strategic Information Systems Planning Success
ERIC Educational Resources Information Center
Elysee, Gerald
2012-01-01
The success of strategic information systems planning (SISP) is of paramount importance to academics as well as practitioners. SISP is a management process that enables organizations to successfully harness the power of current- and next-generation information systems (IS) applications to fulfill their business goals. Hence, by capturing the major…
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
NASA Technical Reports Server (NTRS)
1994-01-01
This is the Calibration Management Plan for the Earth Observing System/Advanced Microwave Sounding Unit-A (AMSU-A). The plan defines calibration requirements, calibration equipment, and calibration methods for the AMSU-A, a 15 channel passive microwave radiometer that will be used for measuring global atmospheric temperature profiles from the EOS polar orbiting observatory. The AMSU-A system will also provide data to verify and augment that of the Atmospheric Infrared Sounder.
NASA Astrophysics Data System (ADS)
Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.
2017-11-01
Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.
41 CFR 101-4.230 - Transition plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Transition plans. 101-4.230 Section 101-4.230 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...
Tank waste remediation system tank waste retrieval risk management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klimper, S.C.
1997-11-07
This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.
United States Army Medical Materiel Development Activity: 1997 Annual Report.
1997-01-01
business planning and execution information management system (Project Management Division Database ( PMDD ) and Product Management Database System (PMDS...MANAGEMENT • Project Management Division Database ( PMDD ), Product Management Database System (PMDS), and Special Users Database System:The existing...System (FMS), were investigated. New Product Managers and Project Managers were added into PMDS and PMDD . A separate division, Support, was
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
Autonomous mission management for UAVs using soar intelligent agents
NASA Astrophysics Data System (ADS)
Gunetti, Paolo; Thompson, Haydn; Dodd, Tony
2013-05-01
State-of-the-art unmanned aerial vehicles (UAVs) are typically able to autonomously execute a pre-planned mission. However, UAVs usually fly in a very dynamic environment which requires dynamic changes to the flight plan; this mission management activity is usually tasked to human supervision. Within this article, a software system that autonomously accomplishes the mission management task for a UAV will be proposed. The system is based on a set of theoretical concepts which allow the description of a flight plan and implemented using a combination of Soar intelligent agents and traditional control techniques. The system is capable of automatically generating and then executing an entire flight plan after being assigned a set of objectives. This article thoroughly describes all system components and then presents the results of tests that were executed using a realistic simulation environment.
Description of data base management systems activities
NASA Technical Reports Server (NTRS)
1983-01-01
One of the major responsibilities of the JPL Computing and Information Services Office is to develop and maintain a JPL plan for providing computing services to the JPL management and administrative community that will lead to improved productivity. The CISO plan to accomplish this objective has been titled 'Management and Administrative Support Systems' (MASS). The MASS plan is based on the continued use of JPL's IBM 3032 Computer system for administrative computing and for the MASS functions. The current candidate administrative Data Base Management Systems required to support the MASS include ADABASE, Cullinane IDMS and TOTAL. Previous uses of administrative Data Base Systems have been applied to specific local functions rather than in a centralized manner with elements common to the many user groups. Limited capacity data base systems have been installed in microprocessor based office automation systems in a few Project and Management Offices using Ashton-Tate dBASE II. These experiences plus some other localized in house DBMS uses have provided an excellent background for developing user and system requirements for a single DBMS to support the MASS program.
36 CFR 219.13 - Coordination among Federal agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.13 Coordination among Federal agencies. The responsible official must provide early and... proposed actions; (b) For the streamlined coordination of Federal agency policies, resource management...
A Mode of Combined ERP and KMS Knowledge Management System Construction
NASA Astrophysics Data System (ADS)
Yuena, Kang; Yangeng, Wen; Qun, Zhou
The core of ERP and knowledge management is quite similar; both will send appropriate knowledge (goods, funds) to the right people (position) at the right time. It is reasonable to believe that increase the knowledge management system in ERP will help companies achieve their goals better. This paper compares the concept of logical point of hall three-dimensional structure of the knowledge management system and the ERP in methodology level. And found they are very similar in the time dimension, logic dimension and knowledge dimension. This laid the basis of methodology in the simultaneous planning, implementation and applications. And then proposed a knowledge-based ERP Multi-Agent Management System Model. Finally, the paper described the process from planning to implementation of knowledge management ERP system with multi-Agent interaction and impact from three concepts, management thinking, software and system.
NASA Technical Reports Server (NTRS)
1979-01-01
Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
Strategic Planning for Management Information Systems.
ERIC Educational Resources Information Center
Ein-Dor, Phillip; Segev, Eli
1978-01-01
Two factors predominate in determining the appropriateness of strategic plans for management information systems (MIS)--explicitness (the degree to which the process is conscious, formal, and documented) and situational fit (the degree to which the MIS is compatible with the specific organization and its members). (Author/IRT)
Next-generation simulation and optimization platform for forest management and analysis
Antti Makinen; Jouni Kalliovirta; Jussi Rasinmaki
2009-01-01
Late developments in the objectives and the data collection methods of forestry create new challenges and possibilities in forest management planning. Tools in forest management and forest planning systems must be able to make good use of novel data sources, use new models, and solve complex forest planning tasks at different scales. The SIMulation and Optimization (...
Natural resource assessment and decision support tools for bird conservation planning
Carl E. Korschgen; Melinda G. Knutson; Timothy J. Fox; Leslie Holland-Bartels; Henry C. Dehaan; Charles H. Theiling; Jason J. Rohweder; Kevin Kenow; Linda E. Leake; Tom Will
2005-01-01
We have used a place-based decision support system for several years to identify bird conservation issues relating to the management and planning needs of resource managers. Public and private land managers are constantly seeking better ways to incorporate landscape, species, and habitat relationships into the conservation planning process. The U.S. Fish and Wildlife...
Managed care innovation and new product development.
Clark, C S; Schuster, T B
1994-01-01
This article explores recent innovative activity by managed care payor plans nationwide with particular emphasis on emerging, new relationships between the plans and their purchasers, enrollees, provider panels, and competitors. Because they already practice what advocates of health care reform are now preaching, many managed care plans are leading the charge to transform our health care delivery and financing systems.
Ruland, C M; Ravn, I H
2001-01-01
An important strategy for improving resource management and cost containment in health care is to develop information systems that assist hospital managers in financial management, resource allocation, and activity planning. A crucial part of such development is a rigorous evaluation to assess whether the system accomplishes it's intended goals. To evaluate CLASSICA, a Decision Support System (DSS), that assists nurse managers in financial management, resource allocation, staffing, and activity planning. Using a pre-post test design with control units, CLASSICA was evaluated in four test units. Baseline data and simultaneous parallel measures were collected prior to system implementation at test sites and control units. Using expense reports, staffing and financial statistics, surveys, interviews with nurse managers, and logs as data sources, CLASSICA was evaluated on: cost reduction, quality of management information; usefulness as decision support for improved financial management and decision-making; user satisfaction; and ease of use. Evaluation results showed a 41% reduction in expenditures for overtime and extra hours as compared to a 1.8% reduction in control units during the same time period. Users reported a significant improvement in management information; nurse managers stated that they had gained control over costs. The system helped them analyze the relationships between patient activity staffing, and cost of care. Users reported high satisfaction with the system, the information and decision support it provided, and its ease of use. These results suggest that CLASSICA is a DSS that successfully assists nurse managers in cost effective management of their units.
The Automated Logistics Element Planning System (ALEPS)
NASA Technical Reports Server (NTRS)
Schwaab, Douglas G.
1991-01-01
The design and functions of ALEPS (Automated Logistics Element Planning System) is a computer system that will automate planning and decision support for Space Station Freedom Logistical Elements (LEs) resupply and return operations. ALEPS provides data management, planning, analysis, monitoring, interfacing, and flight certification for support of LE flight load planning activities. The prototype ALEPS algorithm development is described.
NASA Astrophysics Data System (ADS)
White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.
2017-12-01
Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed heads from the previous management period and adjusted depending upon triggers outlined in the management plan. The effectiveness of water restrictions as a management technique for the purpose of maintaining supply reliability under various decision making frequencies, aquifer response times and climate scenarios was explored.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Artmann, Martina, E-mail: m.artmann@ioer.de
Managing urban soil sealing is a difficult venture due to its spatial heterogeneity and embedding in a socio-ecological system. A systemic solution is needed to tackle its spatial, ecological and social sub-systems. This study develops a guideline for urban actors to find a systemic solution to soil sealing management based on two case studies in Germany: Munich and Leipzig. Legal-planning, informal-planning, economic-fiscal, co-operative and informational responses were evaluated by indicators to proof which strategy considers the spatial complexity of urban soil sealing (systemic spatial efficiency) and, while considering spatial complexity, to assess what the key management areas for action aremore » to reduce the ecological impacts by urban soil sealing (ecological impact efficiency) and to support an efficient implementation by urban actors (social implementation efficiency). Results suggest framing the systemic solution to soil sealing management through a cross-scale, legal-planning development strategy embedded in higher European policies. Within the socio-ecological system, the key management area for action should focus on the protection of green infrastructure being of high value for actors from the European to local scales. Further efforts are necessary to establish a systemic monitoring concept to optimize socio-ecological benefits and avoid trade-offs such as between urban infill development and urban green protection. This place-based study can be regarded as a stepping stone on how to develop systemic strategies by considering different spatial sub-targets and socio-ecological systems. - Highlights: • Urban soil sealing management is spatially complex. • The legal-planning strategy supports a systemic sealing management. • Urban green infrastructure protection should be in the management focus. • Soil protection requires policies from higher levels of government. • A systemic urban soil sealing monitoring concept is needed.« less
The key to successful management of STS operations: An integrated production planning system
NASA Technical Reports Server (NTRS)
Johnson, W. A.; Thomasen, C. T.
1985-01-01
Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
ERIC Educational Resources Information Center
Baird, Aaron; Riggins, Frederick J.
2012-01-01
An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…
The Case for Case-Mix: A New Construct for Hospital Management
Plomann, Marilyn Peacock; Garzino, Fred R.
1981-01-01
Case-mix is a useful methodology for health care management, planning and control. It provides managers with a powerful tool by providing a framework for relating resource consumption profiles with specific treatment patterns. In the long run, it will assist hospital planners in analyzing the demands which different classes of patients bring to the hospital. Decisions concerning capital financing, facilities planning, new services, and the medical and financial implications of physician activities are more efficiently analyzed within a case-mix framework. In the near term, inventory management, staffing policies and the on-going need for the astute management of cash flow will be postively and decisively affected by the use of case-mix measures. The benefits derived from a case-mix system are not limited to hospitals possessing sophisticated management information systems. The case-mix methodology also provides a useful tool for hospitals with less advanced data processing systems and management practices in applying a variety of management science techniques to their planning and control activities.
Application of a risk management system to improve drinking water safety.
Jayaratne, Asoka
2008-12-01
The use of a comprehensive risk management framework is considered a very effective means of managing water quality risks. There are many risk-based systems available to water utilities such as ISO 9001 and Hazard Analysis and Critical Control Point (HACCP). In 2004, the World Health Organization's (WHO) Guidelines for Drinking Water Quality recommended the use of preventive risk management approaches to manage water quality risks. This paper describes the framework adopted by Yarra Valley Water for the development of its Drinking Water Quality Risk Management Plan incorporating HACCP and ISO 9001 systems and demonstrates benefits of Water Safety Plans such as HACCP. Copyright IWA Publishing 2008.
Thomas P. Hodgman
2005-01-01
State agencies are often considered the prime avenues for implementation of Partners in Flight (PIF) bird conservation plans. Yet, such agencies already have in place a planning structure, which allows for dispersal of Federal Aid funds and guides management actions. Consequently, superimposing additional planning frameworks (e.g., PIF bird conservation plans) on state...
76 FR 42536 - Real-Time System Management Information Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...
NASA Technical Reports Server (NTRS)
Callender, E. David; Steinbacher, Jody
1989-01-01
This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.
ERIC Educational Resources Information Center
Cotter, Barbara
Intended to aid administrators and users of social services in establishing information systems, this comprehensive guide to the design of such systems identifies the elements, effective strategies, and potential pitfalls involved in their planning, implementation, and utilization. Detailed discussions of management strategies for system…
36 CFR 219.17 - Interaction with private landowners.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for... national forests or grasslands to identify: (a) Local knowledge; (b) Potential actions and partnership activities; (c) Potential conditions and activities on the adjacent lands that may affect management of...
36 CFR 219.17 - Interaction with private landowners.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for... national forests or grasslands to identify: (a) Local knowledge; (b) Potential actions and partnership activities; (c) Potential conditions and activities on the adjacent lands that may affect management of...
Planning and design of a knowledge based system for green manufacturing management
NASA Astrophysics Data System (ADS)
Kamal Mohd Nawawi, Mohd; Mohd Zuki Nik Mohamed, Nik; Shariff Adli Aminuddin, Adam
2013-12-01
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, R.E.
1994-11-02
This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.
41 CFR 101-26.306 - Planned requisitioning for GSA stock items.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Planned requisitioning for GSA stock items. 101-26.306 Section 101-26.306 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26...
41 CFR 102-37.165 - Do plans or major amendments require public notice?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Do plans or major amendments require public notice? 102-37.165 Section 102-37.165 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY...
41 CFR 101-4.225 - Educational institutions eligible to submit transition plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Educational institutions eligible to submit transition plans. 101-4.225 Section 101-4.225 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4...
41 CFR 101-4.225 - Educational institutions eligible to submit transition plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Educational institutions eligible to submit transition plans. 101-4.225 Section 101-4.225 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4...
Johnson, Matthew; Kern, Jeffrey; Haig, Susan M.
2010-01-01
This report provides an analysis of California Condor (Gymnogyps californianus) space use of six management units in southern California (Hopper Mountain and Bitter Creek National Wildlife Refuges, Wildlands Conservancy-Wind Wolves Preserve, Tejon Mountain Village Specific Plan, California Condor Study Area, and the Tejon Ranch excluding Tejon Mountain Village Specific Plan and California Condor Study Area). Space use was analyzed to address urgent management needs using location data from Global Positioning System transmitters. The U.S. Fish and Wildlife Service provided the U.S. Geological Survey with location data (2004-09) for California Condors from Global Positioning System transmitters and Geographic Information System data for the six management units in southern California. We calculated relative concentration of use estimates for each management unit for each California Condor (n = 21) on an annual basis (n = 39 annual home ranges) and evaluated resource selection for the population each year using the individual as our sampling unit. The most striking result from our analysis was the recolonization of the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units during 2008. During 2004-07, the home range estimate for two (25 percent) California Condors overlapped the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units (n = 8), and use within the annual home range generally was bimodal and was concentrated on the Bitter Creek and Hopper Mountain National Wildlife Refuges. However, 10 (77 percent) California Condor home ranges overlapped the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units during 2008 (n = 13), and by 2009, the home range of every condor carrying a Global Positioning System transmitter (n = 14) overlapped these management units. Space use was multimodal within the home range during 2008-09 and was concentrated on Hopper Mountain Refuge in the south, Bittercreek Refuge and the Wind Wolves Preserve in the northwest, and the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units in the northeast. Recolonization of the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units reestablished traditional condor movement and foraging patterns in southern California and provides the travel corridor (approximately 20 kilometers wide) for recolonization of the northeastern part of the species historical range.
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
77 FR 77121 - Hispanic Council on Federal Employment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
.... Reviewing leading practices in strategic human resources management planning; b. Providing advice on ways to... technical expertise regarding strategic human resources management planning and the merit systems principles... OFFICE OF PERSONNEL MANAGEMENT Hispanic Council on Federal Employment AGENCY: Office of Personnel...
Integrating Bill of Materials Data Into the Armys Enterprise Resource Planning Systems
2016-05-17
management with a concentration in human resources from Virginia State University and an MBA from Averett University, and he is a public policy...57 Army Sustainment November–December 2015 As the Army moves to an en-terprise resource planning... Resource Planning Systems By LeQuan M. Hylton TOOLS The fielding of Global Combat Support System–Army has changed the way the Army manages bill
Civil Engineering Work Information Management System (WIMS) Planning Guide,
1985-04-01
WORK INFORMATION MANAGEMENT SYSTEM PLANNING GUIDE l-!O L~ JAUG 0)12 13 "’ ’’’ " " 5 7 2 2 0 0 9 W WTVF--- DISCLAIMER The views and conclusions...y CHAPTER PAGE I INTRODUCTION What is WIMS? --------------------------------- 1I Why Do We Need A WIMS Planning Guide? ------------ I The Target...Administrator ------------------ 21 6 EQUIPMENT AND SUPPLIES Introduction ------------------------------- 22 Magnetic Media Supplies
14 CFR 152.303 - Financial management system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Financial management system. 152.303... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.303 Financial management system. Each sponsor or planning agency shall establish and maintain a financial management system that...
14 CFR 152.303 - Financial management system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Financial management system. 152.303... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.303 Financial management system. Each sponsor or planning agency shall establish and maintain a financial management system that...
China Report, Economic Affairs
1987-01-28
further that while relaxing control over the microeconomy , we must make corresponding improvements in the work of planned management and stretigthen...borne out by practice that in the course of reforming the economic structure, it is necessary to further invigorate the microeconomy while...the microeconomy . This is the current new task for planned management. The establishment of a new system of planned management that suits the commodity
Solid waste information and tracking system client-server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
May, D.L.
1998-04-15
This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less
45 CFR 205.36 - State plan requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... account for— (1) All the factors in the total eligibility determination process under the plan for aid...
The U.S. National Plan for Civil Earth Observations
NASA Astrophysics Data System (ADS)
Stryker, T.; Clavin, C.; Gallo, J.
2014-12-01
Globally, the United Sates Government is one of the largest providers of environmental and Earth-system data. As the nation's Earth observation capacity has grown, so have the complexity and challenges associated with managing Earth observation systems and related data holdings. In July 2014, the White House Office of Science and Technology Policy released the first-ever National Plan for Civil Earth Observations to address these challenges. The Plan provides a portfolio management-based framework for maximizing the value of Federal Earth observations. The Plan identifies Federal priorities for Earth observations and improved management of their data. Through routine assessments, expanding data management efforts, interagency planning, and international collaboration, OSTP and its partner agencies will seek ensure the continued provision of and access to key Earth observation data, which support a broad range of public services and research programs. The presenters will provide a detailed review of the components of the National Plan, its impacts across the Federal agencies involved in Earth observations, and associated efforts to enable interagency coordination.
Information planning for the 1980's and 1990's.
Flanagan, J B; Peterson, R C; Surnamer, J
1984-07-01
With the shift in reimbursement, new medical technology, and increased competition, hospitals must be managed more effectively. Management information systems are being developed to meet these new challenges. This article provides an overview of the types of information needed and outlines the development of a comprehensive information systems plan.
The Value of Accuracy in Information for Planning and Control
ERIC Educational Resources Information Center
Higgins, J. C.
1974-01-01
The author discusses some approaches to assessing the impact of inaccurate information when the planning system involves formulae of the management accounting type or models of the operational research variety. The most appropriate method for quantifying information value in management information systems is through Bayesian analysis and decision…
Examining the Planning and Management of Principal Succession
ERIC Educational Resources Information Center
Zepeda, Sally J.; Bengtson, Ed; Parylo, Oksana
2012-01-01
Purpose: The purpose of this study is to examine principal succession planning and management by analyzing current practices of handling school leader succession in four Georgia school systems. Design/methodology/approach: Looking through the lens of organizational leadership succession theory, the practices of school systems as they experienced…
Emergency management in health: key issues and challenges in the UK.
Lee, Andrew C K; Phillips, Wendy; Challen, Kirsty; Goodacre, Steve
2012-10-19
Emergency planning in the UK has grown considerably in recent years, galvanised by the threat of terrorism. However, deficiencies in NHS emergency planning were identified and the evidence-base that underpins it is questionable. Inconsistencies in terminologies and concepts also exist. Different models of emergency management exist internationally but the optimal system is unknown. This study examines the evidence-base and evidence requirements for emergency planning in the UK health context. The study involved semi-structured interviews with key stakeholders and opinion leaders. Purposive sampling was used to obtain a breadth of views from various agencies involved in emergency planning and response. Interviews were then analysed using a grounded approach using standard framework analysis techniques. We conducted 17 key informant interviews. Interviewees identified greater gaps in operational than technical aspects of emergency planning. Social and behavioural knowledge gaps were highlighted with regards to how individuals and organisations deal with risk and behave in emergencies. Evidence-based approaches to public engagement and for developing community resilience to disasters are lacking. Other gaps included how knowledge was developed and used. Conflicting views with regards to the optimal configuration and operation of the emergency management system were voiced. Four thematic categories for future research emerged:(i) Knowledge-base for emergency management: Further exploration is needed of how knowledge is acquired, valued, disseminated, adopted and retained.(ii) Social and behavioural issues: Greater understanding of how individuals approach risk and behave in emergencies is required.(iii) Organisational issues in emergencies: Several conflicting organisational issues were identified; value of planning versus plans, flexible versus standardized procedures, top-down versus bottom-up engagement, generic versus specific planning, and reactive versus proactive approaches to emergencies.(iv) Emergency management system: More study is required of system-wide issues relating to system configuration and operation, public engagement, and how emergency planning is assessed.
NASA Astrophysics Data System (ADS)
Uchegbu, Smart N.
Plan and policy development usually define the course, goal, execution, success or failure of any public utilities initiative. Urban water supply is not an exception. Planning and management in public water supply systems often determine the quality of service the water supply authorities can render. This paper, therefore, addresses the issue of effective planning and management as critical determinants of urban water supply and management with respect to two Nigerian cities Umuahia and Aba both in Abia State. Appropriate sampling methods systematic sampling and cluster techniques were employed in order to collect data for the study. The collected data were analyzed using multiple linear regression. The findings of the study indicate that planning and management indices such as funding, manpower, water storage tank capacity greatly influence the volume of water supplied in the study areas. Funding was identified as a major determinant of the efficiency of the water supply system. Therefore, the study advocates the need for sector reforms that would usher in private participants in the water sector both for improved funding and enhanced productivity.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... Management Area boundary determination; Travel management system to accommodate many uses while maintaining... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCOS06000 L12200000.DP0000] Notice of Intent To Amend the Resource Management Plan for the Gunnison Field Office and Prepare an Associated...
ERIC Educational Resources Information Center
Yelken, Tugba Yanpar; Kilic, Figen; Ozdemir, Caner
2012-01-01
In recent years, strategic planning has become one of the subjects that many institutions work on to ensure the institutions' appropriate management based on realistic results. Therefore, this planning has to be taken into account and should provide planning direction on the bases of its results. Basically, the manager of strategic planning,…
Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ding, Yi; Kang, Chongqing; Wang, Jianhui
2015-03-01
The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.
Careful Planning Key to Accurate Fixed Reports Assets.
ERIC Educational Resources Information Center
MaRous, Arnold M.
1986-01-01
Only with careful planning can school business managers develop fixed asset information and good recordkeeping. Use of a simple inventory system and discussion with school districts already utilizing this system will assist planning. (CJH)
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
48 CFR 243.204-70-7 - Plans and reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced management and oversight of unpriced change orders, departments and agencies shall— (a) Include in the Consolidated Undefinitized Contract Action (UCA) Management...
Management Information Systems, Planning, and Public Community Colleges.
ERIC Educational Resources Information Center
Ritch, Stephen W.; Munro, Robert J.
Management Information Systems (MIS), originally developed in the areas of accounting, management science, and computer processing, are now being applied to decision-making in educational settings. Definitions of MIS are numerous and often vague, but management systems (as distinguished from other information systems) should promote real-time…
Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
Handbook of emergency management for state-level transportation agencies.
DOT National Transportation Integrated Search
2010-03-01
The Department of Homeland Security has mandated specific systems and techniques for the management of emergencies in the United States, including the Incident Command System, the National Incident Management System, Emergency Operations Plans, Emerg...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
..., recreation, visual resource management, public safety, law enforcement, and geographic information systems... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWY930000-L16100000-DS0000] Notice of Intent To Prepare a Resource Management Plan for the Rock Springs Field Office, Wyoming and Associated...
Fire management over large landscapes: a hierarchical approach
Kenneth G. Boykin
2008-01-01
Management planning for fires becomes increasingly difficult as scale increases. Stratification provides land managers with multiple scales in which to prepare plans. Using statistical techniques, Geographic Information Systems (GIS), and meetings with land managers, we divided a large landscape of over 2 million acres (White Sands Missile Range) into parcels useful in...
Case Management: Let Us Count the Ways.
ERIC Educational Resources Information Center
Austin, Carol D.
Case management as implemented in programs for the elderly, has focused on interactions between the client and case manager in the areas of assessment, care planning, service plan implementation, and follow-up. Variation in these case management tasks suggests that no single model can be implemented in all local delivery systems. This emphasis on…
1982-05-01
AD-AllA 143 GENERAL RESEARCH CORP MCLEAN VA MANAGEMENT SYSTEMS DIV F/G 5/9 MoD IFI CATI ONS TO ELIM-COMPL.IP AND MOSLS FOR MOBILIZATION STRENG--ETC...111111____22 I Report 1257-02-CR I Modifications I To ELIM-COMPLIP and MOSLS for I ’ Mobilization Strength Planning and Management -~ For Enlisted...Personnel By: I K.D. Midlamn, Project Manage W.E. Bartlett E. Bergs B.W. Holz M.J. Maloney I May 1982 MANAGEMENT SYSTEMS DIVISIONI GENERAL ( RESEARCH
A multi-echelon supply chain model for municipal solid waste management system.
Zhang, Yimei; Huang, Guo He; He, Li
2014-02-01
In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well. Copyright © 2013 Elsevier Ltd. All rights reserved.
A multi-echelon supply chain model for municipal solid waste management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, Yimei, E-mail: yimei.zhang1@gmail.com; Huang, Guo He; He, Li
2014-02-15
In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions ofmore » the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.« less
Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.
1982-04-01
prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more
Strategy: A Philosophy of Doctrine.
1983-06-01
job becomes merely managers of violence in 17 war, and of the bureaucracy in peace. Under these conditions, the study of strategy falls between...planning proposals for consideration by Congress, is almost myopically concerned with the annual budget 71 and with crisis management ." Very little...company of any importance has a management action planning system to enable it to operate by plan and anticipation rather than by simply responding
Woltmann, Emily M; Wilkniss, Sandra M; Teachout, Alexandra; McHugo, Gregory J; Drake, Robert E
2011-01-01
Involvement of community mental health consumers in mental health decision making has been consistently associated with improvements in health outcomes. Electronic decision support systems (EDSSs) that support both consumer and provider decision making may be a sustainable way to improve dyadic communication in a field with approximately 50% workforce turnover per year. This study examined the feasibility of such a system and investigated proximal outcomes of the system's performance. A cluster randomized design was used to evaluate an EDSS at three urban community mental health sites. Case managers (N=20) were randomly assigned to the EDSS-supported planning group or to the usual care planning group. Consumers (N=80) were assigned to the same group as their case managers. User satisfaction with the care planning process was assessed for consumers and case managers (possible scores range from 1 to 5, with higher summary scores indicating more satisfaction). Recall of the care plan was assessed for consumers. Linear regression with adjustment for grouping by worker was used to assess satisfaction scores. A Wilcoxon rank-sum test was used to examine knowledge of the care plan. Compared with case managers in the control group, those in the intervention group were significantly more satisfied with the care planning process (mean ± SD score=4.0 ± .5 versus 3.3 ± .5; adjusted p=.01). Compared with consumers in the control group, those in the intervention group had significantly greater recall of their care plans three days after the planning session (mean proportion of plan goals recalled=75% ± 28% versus 57% ± 32%; p=.02). There were no differences between the clients in the intervention and control groups regarding satisfaction. This study demonstrated that clients can build their own care plans and negotiate and revise them with their case managers using an EDSS.
1991-12-01
AUSTRALIAN AIR FORCE STRATEGIC AIRLIFT PLANNING bY APPLICATION OF A COMPTER BASED MANAGEMENT INFO4ATION SYSTEM THESIS Presented to the Faculty of the...Master of Science in Information Management Neil A. Cooper, BBus Squadron Leader, RAAF December 1991 Approved for public release; distribution unlimited...grateful to the time and honest views given to me by the ADANS manager , Lieutenant Colonel Charlie Davis. For my Canadian research, I relied on the
Hannan, M A; Abdulla Al Mamun, Md; Hussain, Aini; Basri, Hassan; Begum, R A
2015-09-01
In the backdrop of prompt advancement, information and communication technology (ICT) has become an inevitable part to plan and design of modern solid waste management (SWM) systems. This study presents a critical review of the existing ICTs and their usage in SWM systems to unfold the issues and challenges towards using integrated technologies based system. To plan, monitor, collect and manage solid waste, the ICTs are divided into four categories such as spatial technologies, identification technologies, data acquisition technologies and data communication technologies. The ICT based SWM systems classified in this paper are based on the first three technologies while the forth one is employed by almost every systems. This review may guide the reader about the basics of available ICTs and their application in SWM to facilitate the search for planning and design of a sustainable new system. Copyright © 2015 Elsevier Ltd. All rights reserved.
Utilization of Information Provided by the Wisconsin Management System.
ERIC Educational Resources Information Center
Rossmiller, Richard A.
The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…
Decision Support Systems for Research and Management in Advanced Life Support
NASA Technical Reports Server (NTRS)
Rodriquez, Luis F.
2004-01-01
Decision support systems have been implemented in many applications including strategic planning for battlefield scenarios, corporate decision making for business planning, production planning and control systems, and recommendation generators like those on Amazon.com(Registered TradeMark). Such tools are reviewed for developing a similar tool for NASA's ALS Program. DSS are considered concurrently with the development of the OPIS system, a database designed for chronicling of research and development in ALS. By utilizing the OPIS database, it is anticipated that decision support can be provided to increase the quality of decisions by ALS managers and researchers.
Advanced rural transportation systems (ARTS) : strategic plan
DOT National Transportation Integrated Search
1997-08-01
This Strategic Plan has been developed for the Advanced Rural Transportation Systems (ARTS) portion of the ITS Program. The plan focuses on the Federal Government's role in developing rural ITS options and prudently managing emerging ITS technologies...
Cost-Benefit Analysis of the Officer Career Information and Planning System
1980-08-01
information without the use of a computer. - vii COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFOýKATTON AND PLANNING SYSTEM CONTENTS Page INTRODUCTION ...OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM INTRODUCTION The implementation of the Officer Personnel Management System (OPMS) has...Research Report 1256 I / COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM Roger A. Myers, Peter C. Cairo, K - Jon A
Priority scheme planning for the robust SSM/PMAD testbed
NASA Technical Reports Server (NTRS)
Elges, Michael R.; Ashworth, Barry R.
1991-01-01
Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.
Risk management and disaster recovery planning for online libraries.
Uzwyshyn, Ray
2015-01-01
This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.
The Development of a Planning, Programming and Budgeting System. Technical Report.
ERIC Educational Resources Information Center
Appelquist, Claes-Goran; Zandren, S.
In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…
A Model for Talent Management and Career Planning
ERIC Educational Resources Information Center
Waheed, Sajjad; Zaim, A. Halim
2015-01-01
This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…
New Map Symbol System for Disaster Management
NASA Astrophysics Data System (ADS)
Marinova, Silvia T.
2018-05-01
In the last 10 years Bulgaria was frequently affected by natural and man-made disasters that caused considerable losses. According to the Bulgarian Disaster Management Act (2006) disaster management should be planned at local, regional and national level. Disaster protection is based on plans that include maps such as hazard maps, maps for protection, maps for evacuation planning, etc. Decision-making and cooperation between two or more neighboring municipalities or regions in crisis situation are still rendered difficult because the maps included in the plans differ in scale, colors, map symbols and cartographic design. To improve decision-making process in case of emergency and to reduce the number of human loss and property damages disaster management plans at local and regional level should be supported by detailed thematic maps created in accordance with uniform contents, map symbol system and design. The paper proposes a new symbol system for disaster management that includes a four level hierarchical classification of objects and phenomena according to their type and origin. All objects and phenomena of this classification are divided into five categories: disasters; infrastructure; protection services and infrastructure for protection; affected people and affected infrastructure; operational sites and activities. The symbols of these categories are shown with different background colors and shapes so that they are identifiable. All the symbols have simple but associative design. The new symbol system is used in the design of a series of maps for disaster management at local and regional level.
Resources planning for radiological incidents management
NASA Astrophysics Data System (ADS)
Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.
2017-01-01
Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.
NASA Astrophysics Data System (ADS)
Kolahi, Mahdi; Sakai, Tetsuro; Moriya, Kazuyuki; Makhdoum, Majid F.; Koyama, Lina
2013-08-01
The requirement to assess the management effectiveness (ME) in protected areas (PAs) is increasing around the world to help improve management and accountability. An evaluation of ME for Khojir National Park (KNP), one of the Iran's oldest PAs, was conducted using a multi-method approach that consisted of structured interviews, open interviews, and site visits. This was the first ME evaluation in Iran. The structured interview was based on the management effectiveness tracking tool methodology. KNP received an average score of 43 %, which is lower than the global average, illustrating that its general management was in the low-intermediate level. The indices of legal status, resource inventory, planning for land and water use, regulations, and objectives received the highest average scores, whereas education and awareness, community co-management, regular work plan, boundary demarcation, visitor facilities, budget sources, staff training, protection systems, and management plan received the lowest ones. The management system of KNP was generally established, but many problems of the management still need to be resolved. To improve ME, some countermeasures should be taken, such as increasing funding, strengthening capacity building, planning, and adaptive management, and implementing community participation.
Guide to Developing an Environmental Management System - Act
This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Act section.
Guide to Developing an Environmental Management System - Check
This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Check section.
Data systems can boost nursing care. Nurse management information systems in resource management.
Wilson, J
1992-02-01
Resource management aims to improve patient care by matching resources with patient needs. Nurse management information systems provide data on skill mix, rostering requirements, ward costs and patient dependency levels, enabling a nursing strategy to be planned for the ward.
48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Representatives, or equivalent positions. (c) The program shall include: (1) Management information system... acquisition workforce management information system. (2) Individual assessments and development plans for... Acquisition Career Management Program. 2801.603-1 Section 2801.603-1 Federal Acquisition Regulations System...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
...NMFS publishes regulations to implement Amendment 86 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area and Amendment 76 to the Fishery Management Plan for Groundfish of the Gulf of Alaska (Amendments 86/76). Amendments 86/ 76 add a funding and deployment system for observer coverage to the existing North Pacific Groundfish Observer Program (Observer Program) and amend existing observer coverage requirements for vessels and processing plants. The new funding and deployment system allows NMFS to determine when and where to deploy observers according to management and conservation needs, with funds provided through a system of fees based on the ex-vessel value of groundfish and halibut in fisheries covered by the new system. This action is necessary to resolve data quality and cost equity concerns with the Observer Program's existing funding and deployment structure. This action is intended to promote the goals and objectives of the Magnuson-Stevens Fishery Conservation and Management Act, the Northern Pacific Halibut Act of 1982, the fishery management plans, and other applicable law.
Principal Challenges Facing Electronic Records Management in Federal Agencies Today.
ERIC Educational Resources Information Center
Patterson, Giovanna; Sprehe, J. Timothy
2002-01-01
Discusses electronic records management in the federal government. Highlights include managing electronic mail; information technology planning, systems design, and architecture; updating conventional records management; integrating electronic records management with other information technology systems; challenges of end-user training; business…
Mechanisms of microregulation of private hospitals by health plan operators.
Ugá, Maria Alicia Domínguez; Vasconcellos, Miguel Murat; Lima, Sheyla Maria Lemos; Portela, Margareth Crisóstomo; Gerschman, Silvia
2009-10-01
To analyze the mechanisms employed by health plan operators for microregulation of clinical management and health care qualification within care-providing hospitals. A nation-wide cross-sectional study was carried out. The universe consisted of hospitals which provided care to health plan operators in 2006. A sample of 83 units was selected, stratified by Brazilian macroregion and type of hospital. Data were obtained by means of a questionnaire administered to hospital managers. Microregulation of hospitals by health plan operators was minimal or almost absent in terms of health care qualification. Operator activity focused predominantly on intense control of the amount of services used by patients. Hospitals providing services to health plan operators did not constitute health micro-systems parallel or supplementary to the Sistema Unico de Saúde (SUS - Brazilian National Health System). The private care-providing hospitals were predominantly associated with SUS. However, these did not belong to a private care-provider network, even though their service usage was subject to strong regulation by health plan operators. Operator intervention in the form of system management was incipient or virtually absent. Roughly one-half of investigated hospitals reported adopting clinical directives, whereas only 25.4% reported managing pathology and 30.5% reported managing cases. Contractual relationships between hospitals and health plan operators are merely commercial contracts with little if any incorporation of aspects related to the quality of care, being generally limited to aspects such as establishment of prices, timeframes, and payment procedures.
Manager's assistant systems for space system planning
NASA Technical Reports Server (NTRS)
Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James
1992-01-01
This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.
Collaborative Early Systems Engineering: Strategic Information Management Review
2010-09-02
Early Systems Engineering: Strategic Information Management Review 2 Table of Contents Executive Summary...5 Center for Systems Engineering (CSE) .............................................................................. 6...Collaborative Early Systems Engineering .......................................................................... 6 Development Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
DOT National Transportation Integrated Search
1997-02-01
This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...
Resource Management in Constrained Dynamic Situations
NASA Astrophysics Data System (ADS)
Seok, Jinwoo
Resource management is considered in this dissertation for systems with limited resources, possibly combined with other system constraints, in unpredictably dynamic environments. Resources may represent fuel, power, capabilities, energy, and so on. Resource management is important for many practical systems; usually, resources are limited, and their use must be optimized. Furthermore, systems are often constrained, and constraints must be satisfied for safe operation. Simplistic resource management can result in poor use of resources and failure of the system. Furthermore, many real-world situations involve dynamic environments. Many traditional problems are formulated based on the assumptions of given probabilities or perfect knowledge of future events. However, in many cases, the future is completely unknown, and information on or probabilities about future events are not available. In other words, we operate in unpredictably dynamic situations. Thus, a method is needed to handle dynamic situations without knowledge of the future, but few formal methods have been developed to address them. Thus, the goal is to design resource management methods for constrained systems, with limited resources, in unpredictably dynamic environments. To this end, resource management is organized hierarchically into two levels: 1) planning, and 2) control. In the planning level, the set of tasks to be performed is scheduled based on limited resources to maximize resource usage in unpredictably dynamic environments. In the control level, the system controller is designed to follow the schedule by considering all the system constraints for safe and efficient operation. Consequently, this dissertation is mainly divided into two parts: 1) planning level design, based on finite state machines, and 2) control level methods, based on model predictive control. We define a recomposable restricted finite state machine to handle limited resource situations and unpredictably dynamic environments for the planning level. To obtain a policy, dynamic programing is applied, and to obtain a solution, limited breadth-first search is applied to the recomposable restricted finite state machine. A multi-function phased array radar resource management problem and an unmanned aerial vehicle patrolling problem are treated using recomposable restricted finite state machines. Then, we use model predictive control for the control level, because it allows constraint handling and setpoint tracking for the schedule. An aircraft power system management problem is treated that aims to develop an integrated control system for an aircraft gas turbine engine and electrical power system using rate-based model predictive control. Our results indicate that at the planning level, limited breadth-first search for recomposable restricted finite state machines generates good scheduling solutions in limited resource situations and unpredictably dynamic environments. The importance of cooperation in the planning level is also verified. At the control level, a rate-based model predictive controller allows good schedule tracking and safe operations. The importance of considering the system constraints and interactions between the subsystems is indicated. For the best resource management in constrained dynamic situations, the planning level and the control level need to be considered together.
A Decision-Support System for Sustainable Water Distribution System Planning.
Freund, Alina; Aydin, Nazli Yonca; Zeckzer, Dirk; Hagen, Hans
2017-01-01
An interactive decision-support system (DSS) can help experts prepare water resource management plans for decision makers and stakeholders. The design of the proposed prototype incorporates visualization techniques such as circle views, grid layout, small multiple maps, and node simplification to improve the data readability of water distribution systems. A case study with three urban water management and sanitary engineering experts revealed that the proposed DSS is satisfactory, efficient, and effective.
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-02-23
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Space Station thermal management system development status and plans
NASA Technical Reports Server (NTRS)
Rankin, J. G.
1985-01-01
The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.
Model Special Education Manpower Information and Management System. Final Report.
ERIC Educational Resources Information Center
Gilles, Cynthia
The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…
Analytical Approaches to Guide SLS Fault Management (FM) Development
NASA Technical Reports Server (NTRS)
Patterson, Jonathan D.
2012-01-01
Extensive analysis is needed to determine the right set of FM capabilities to provide the most coverage without significantly increasing the cost, reliability (FP/FN), and complexity of the overall vehicle systems. Strong collaboration with the stakeholders is required to support the determination of the best triggers and response options. The SLS Fault Management process has been documented in the Space Launch System Program (SLSP) Fault Management Plan (SLS-PLAN-085).
Armored Family of Vehicles (AFV). Phase 1 Report. Book 7. Volume 11
1987-08-31
Armored Family of Vehicles. Specific requirements and products are described which initiate the training development process and a training management ...approach for the TRADOC and proponent schools to plan, develop, manage and integrate the training subsystem(s) for the Armored Family of Vehicles...Procedures. q. Charter, Armored Family of Vehicles. r. Operational and Organizational (O&W) Plan for AFV. s. System MANPRINT Management Plan for AFV
Code of Federal Regulations, 2010 CFR
2010-01-01
... between the performance management system and DoD's strategic plan; (4) A means for ensuring employee... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM...
Code of Federal Regulations, 2011 CFR
2011-01-01
... between the performance management system and DoD's strategic plan; (4) A means for ensuring employee... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM...
Richardson, Leslie; Huber, Chris; Koontz, Lynne
2012-01-01
The National Wildlife Refuge System Improvement Act of 1997 requires all units of the National Wildlife Refuge System to be managed under a Comprehensive Conservation Plan. The Comprehensive Conservation Plan must describe the desired future conditions of a Refuge and provide long-range guidance and management direction to achieve refuge purposes. The Don Edwards San Francisco Bay National Wildlife Refuge, located at the south end of California's San Francisco Bay and one of seven refuges in the San Francisco Bay National Wildlife Refuge Complex, is in the process of developing a range of management goals, objectives, and strategies for the Comprehensive Conservation Plan. The Comprehensive Conservation Plan must contain an analysis of expected effects associated with current and proposed Refuge management strategies. For Refuge Comprehensive Conservation Plan planning, a regional economic analysis provides a means of estimating how current management (No Action Alternative) and proposed management activities (alternatives) affect the local economy. This type of analysis provides two critical pieces of information: (1) it illustrates the Don Edwards San Francisco Bay National Wildlife Refuge's contribution to the local community, and (2) it can help in determining whether economic effects are or are not a real concern in choosing among management alternatives. This report first presents a description of the local community and economy near the Don Edwards San Francisco Bay National Wildlife Refuge. Next, the methods used to conduct a regional economic impact analysis are described. An analysis of the final Comprehensive Conservation Plan management strategies that could affect stakeholders, residents, and the local economy is then presented. The management activities of economic concern in this analysis are: * Spending in the local community by Refuge visitors; * Refuge personnel salary spending; and * Refuge purchases of goods and services within the local community.
Training Management System (TRAMS) Concept Study.
ERIC Educational Resources Information Center
Informatics, Inc., Rockville, MD.
The objective of the Marine Corps Training Management System (TRAMS) is to assist Headquarters Marine Corps staff agencies in the planning and management functions related to the Marine Corps 'training line'. (Author)
A Management Information Systems Needs Analysis for the University of Nevada Reno.
ERIC Educational Resources Information Center
Nevada Univ., Reno.
Results of a needs assessment for administrative computing at the University of Nevada, Reno, are presented. The objectives of the Management Information Systems Task Force are identified, along with 17 problems in existing operational and management data systems, and institutional goals for future planning and management systems. In addition to…
2009-07-30
management information systems for collecting data on their reconstruction activities, but there is no single management information system that provides...spreadsheets, presentations, and other ad hoc reports. An integrated management information system that provides a common operating picture of all U.S
Implementing Student Information Systems
ERIC Educational Resources Information Center
Sullivan, Laurie; Porter, Rebecca
2006-01-01
Implementing an enterprise resource planning system is a complex undertaking. Careful planning, management, communication, and staffing can make the difference between a successful and unsuccessful implementation. (Contains 3 tables.)
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
Management and Planning for Small Community Wastewater
Operators Small Systems Management and Planning for Small Community Wastewater The NESC has provided information below. If you have a technical question we can help. Call us toll free at (304) 293-4191. or e of Clean Water Agencies (NACWA) Achieving Environmental Excellence: An Environmental Management
Tank waste remediation system systems engineering management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peck, L.G.
1998-01-08
This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less
Manpower Goals Planning and Accountability. Research Report 34.
ERIC Educational Resources Information Center
Niehaus, R. J.; Nitterhouse, D.
Based on previous application of goal programming models to manpower goals planning for large organizations, this paper structures the extensions from the planning process to the operations and control aspects of the management cycle. Emphasis is on the accountability necessary to make such a system an effective management control tool. In order…
Strategic management system in a healthcare setting--moving from strategy to results.
Devitt, Rob; Klassen, Wolf; Martalog, Julian
2005-01-01
One of the historical challenges in the healthcare system has been the identification and collection of meaningful data to measure an organization's progress towards the achievement of its strategic goals and the concurrent alignment of internal operating practices with this strategy. Over the last 18 months the Toronto East General Hospital (TEGH) has adopted a strategic management system and organizing framework that has led to a metric-based strategic plan. It has allowed for formal and measurable linkages across a full range of internal business processes, from the annual operating plan to resource allocation decisions, to the balanced scorecard and individual performance evaluations. The Strategic Management System (SMS) aligns organizational planning and performance measurement, facilitates an appropriate balance between organizational priorities and resolving "local" problems, and encourages behaviours that are consistent with the values upon which the organization is built. The TEGH Accountability Framework serves as the foundation for the entire system. A key tool of the system is the rolling three-year strategic plan for the organization that sets out specific annual improvement targets on a number of key strategic measures. Individual program/department plans with corresponding measures ensure that the entire organization is moving forward strategically. Each year, all plans are reviewed, with course adjustments made to reflect changes in the hospital's environment and with re-calibration of performance targets for the next three years to ensure continued improvement and organizational progress. This system has been used through one annual business cycle. Results from the past year show measurable success. The hospital has improved on 12 of the 15 strategic plan metrics, including achieving the targeted 1% operating surplus while operating in an environment of tremendous change and uncertainty. This article describes the strategic management system used at TEGH and demonstrates the formal integration of the plan into its operating and decision making processes. It also provides examples of the metrics, their use in decision-making and the variance reporting and improvement mechanisms. The article also demonstrates that a measurement-oriented approach to the planning and delivery of community hospital service is both achievable and valuable in terms of accountability and organizational responsiveness.
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
Guide to Developing an Environmental Management System - Do
This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. This is the Do section.
[Implementation of a safety and health planning system in a teaching hospital].
Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P
2007-01-01
University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.
Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach
NASA Technical Reports Server (NTRS)
Jacobs, Derya, A.; Aasen, Curtis A.
2000-01-01
Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2011 CFR
2011-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2012 CFR
2012-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2013 CFR
2013-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
Strengthening the management of ESA - the Inter-Directorate Reform of Corporate and Risk Management
NASA Astrophysics Data System (ADS)
Feustel-Büechl, Jörg; Arend, Harald; Derio, Eric; Infante, Giovanni; Kreiner, Gerhard; Phaler, Jesse; Tabbert, Michael
2007-02-01
ESA has undertaken the Inter-Directorate Reform of Corporate and Risk Management to strengthen the Agency's internal operations. The reform was completed at the end of 2006, encompassing five dedicated projects on Risk Management, Agency-Wide Controlling System, Project Plan and Integrated Project Review, General Budget Structure and Charging Policy, and Corporate Information Systems. It has contributed to improved management of the Agency's internal operations by engaging all internal stakeholders in a common objective, introducing improvements to planning and management methods, elaborating consolidated information structures and tools, contributing to enhanced transparency and accountability, and by providing qualified new policies, processes and tools.
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
Silvicultural systems for managing ponderosa pine
Andrew Youngblood
2005-01-01
Silviculturists have primarily relied on classical even-aged silvicultural systems (the planned series of treatments for tending, harvesting, and re-establishing a stand) for ponderosa pine, with uneven-aged systems used to a lesser degree. Current management practices involve greater innovation because of conflicting management objectives. Silvicultural systems used...
ERIC Educational Resources Information Center
Box, Wilford Winston
A study was conducted at Southwest Texas Junior College (STJC) to assess current management practices used by the physical plant maintenance department (PPMD) and to develop a strategic plan for physical plant management. Procedures included an analysis of current management practices and systems that affect physical resources, and periodic and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
Long Range Plan for Information Systems from the State Board of Education.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
The Information Systems Long Range Plan specifically addresses Goal four of the Texas State Board of Education's (SBOE's) "Long-Range Plan for Public School Education" dealing with efficient management and organization of the educational system. To facilitate this goal, the SBOE in 1986 approved and directed the Texas Education Agency to…
48 CFR 243.204-70-7 - Plans and reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Plans and reports. 243.204-70-7 Section 243.204-70-7 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced...
48 CFR 243.204-70-7 - Plans and reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Plans and reports. 243.204-70-7 Section 243.204-70-7 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced...
Succession Planning in a Two-Year Technical College System
ERIC Educational Resources Information Center
Neefe, Diane Osterhaus
2009-01-01
The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…
Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.
2015-01-01
In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381
Role of information systems in public health services.
Hartshorne, J E; Carstens, I L
1990-07-01
The purpose of this review is to establish a conceptual framework on the role of information systems in public health care. Information is indispensable for effective management and development of health services and therefore considered as an important operational asset or resource. A Health Information System is mainly required to support management and operations at four levels: namely transactional and functional; operational control; management planning and control; and strategic planning. To provide the necessary information needs of users at these levels of management in the health care system, a structured information system coupled with appropriate information technology is required. Adequate and relevant information is needed regarding population characteristics, resources available and expended, output and outcome of health care activities. Additionally information needs to be reliable, accurate, timely, easily accessible and presented in a compact and meaningful form. With a well-planned health information system health authorities would be in a position to provide a quality, cost-effective and efficient health service for as many people as need it, optimal utilisation of resources and to maintain and improve the community's health status.
SmartStaff: A Support Concept for Staff Planning
2000-11-01
facilitated time management and decreased the ambiguities of the plans presented. However, the quality of the final plan did not improve. Team decision making, Team Planning, Group Support Systems, Task Group Staff
Ramnarayan, Padmanabhan; Kapoor, Ritika R; Coren, Michael; Nanduri, Vasantha; Tomlinson, Amanda L; Taylor, Paul M; Wyatt, Jeremy C; Britto, Joseph F
2003-01-01
Few previous studies evaluating the benefits of diagnostic decision support systems have simultaneously measured changes in diagnostic quality and clinical management prompted by use of the system. This report describes a reliable and valid scoring technique to measure the quality of clinical decision plans in an acute medical setting, where diagnostic decision support tools might prove most useful. Sets of differential diagnoses and clinical management plans generated by 71 clinicians for six simulated cases, before and after decision support from a Web-based pediatric differential diagnostic tool (ISABEL), were used. A composite quality score was calculated separately for each diagnostic and management plan by considering the appropriateness value of each component diagnostic or management suggestion, a weighted sum of individual suggestion ratings, relevance of the entire plan, and its comprehensiveness. The reliability and validity (face, concurrent, construct, and content) of these two final scores were examined. Two hundred fifty-two diagnostic and 350 management suggestions were included in the interrater reliability analysis. There was good agreement between raters (intraclass correlation coefficient, 0.79 for diagnoses, and 0.72 for management). No counterintuitive scores were demonstrated on visual inspection of the sets. Content validity was verified by a consultation process with pediatricians. Both scores discriminated adequately between the plans of consultants and medical students and correlated well with clinicians' subjective opinions of overall plan quality (Spearman rho 0.65, p < 0.01). The diagnostic and management scores for each episode showed moderate correlation (r = 0.51). The scores described can be used as key outcome measures in a larger study to fully assess the value of diagnostic decision aids, such as the ISABEL system.
Managing multihazards risk in metropolitan USA
NASA Astrophysics Data System (ADS)
Aktan, A. Emin; Comfort, Louise K.; Shanis, Donald S.
2003-07-01
This proposal outlines an action plan for risk management in the Delaware Valley Metropolitan Region. This plan is consistent with the goals for strengthening homeland security announced by President Bush, and is designed to complement efforts currently under development by Pennsylvania Emergency Management Agency and Department of Health. This plan proposes the formation of a Delaware Valley Risk Management Consortium, representing the critical disciplines and organizations related to risk assessment and management. This group would have membership from academic institutions, government agencies, industry, and nonprofit organizations. This Consortium would develop a systemic scope of work with the appropriate recommendations for technology acquisition, development and integration with risk management policies and procedures. This scope of work would include the development of two related information systems for the Delaware Valley Region. The first would be a comprehensive 'health monitoring' system to assess the continuity of operations, which would use integrated remote sensing and imaging, information gathering, communication, computation, and, information processing and management over wide-area networks covering the entire metropolitan area. The second would use real-time information from the health monitoring system to support interactive communication, search and information exchange needed to coordinate action among the relevant agencies to mitigate risk, respond to hazards and manage its resources efficiently and effectively.
[Requirements for the successful installation of an data management system].
Benson, M; Junger, A; Quinzio, L; Hempelmann, G
2002-08-01
Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.
Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2010-12-01
The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
..., wildlife and fisheries, lands and realty, hydrology, soils, sociology, and economics. Proposed planning... flexibility while supporting adaptive management principles; and 15. The Economic Profile System will be used...
Simulating traffic for incident management and ITS investment decisions
DOT National Transportation Integrated Search
1998-08-01
UTPS-type models were designed to adequately support planning activities typical of the 1960s and 1970s. However, these packages were not designed to model intelligent transportation systems (ITS) and support incident management planning. To ov...
78 FR 53732 - National Estuarine Research Reserve System
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Estuarine Research.... ACTION: Notice of approval of the Grand Bay, Mississippi and Delaware National Estuarine Research Reserve... Estuarine Research Reserve Management Plan Revisions. The revised management plans outline the...
78 FR 75548 - National Estuarine Research Reserve System
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-12
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Estuarine Research...: Notice of Approval of the Wells, Maine National Estuarine Research Reserve Management Plan revision... Commerce approves the Wells, Maine National Estuarine Research Reserve Management Plan revision. The...
78 FR 26617 - National Estuarine Research Reserve System
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-07
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Estuarine Research.... ACTION: Notice of Public Comment Period for the Grand Bay, Mississippi National Estuarine Research Reserve Management Plan and the Delaware National Estuarine Research Reserve Management Plan revisions...
Document Management in Local Government.
ERIC Educational Resources Information Center
Williams, Bernard J. S.
1998-01-01
The latest in electronic document management in British local government is discussed. Finance, revenues, and benefits systems of leading vendors to local authorities are highlighted. A planning decisions archive management system and other information services are discussed. (AEF)
Monitoring components of GypsES
Lukas P. Schaub; F. William Ravlin; Jesse A. Logan; Shelby J. Fleischer
1991-01-01
The manager needs tools for assistance in planning and interpreting monitoring systems. We are building a system that designs sampling programs by interpreting data about Gypsy Moth, stand condition and management objectives. The system prioritizes areas within the management unit within budgetary constraints and defines the areas to be monitored. The system proposes...
Clinical review: SARS - lessons in disaster management.
Hawryluck, Laura; Lapinsky, Stephen E; Stewart, Thomas E
2005-08-01
Disaster management plans have traditionally been required to manage major traumatic events that create a large number of victims. Infectious diseases, whether they be natural (e.g. SARS [severe acute respiratory syndrome] and influenza) or the result of bioterrorism, have the potential to create a large influx of critically ill into our already strained hospital systems. With proper planning, hospitals, health care workers and our health care systems can be better prepared to deal with such an eventuality. This review explores the Toronto critical care experience of coping in the SARS outbreak disaster. Our health care system and, in particular, our critical care system were unprepared for this event, and as a result the impact that SARS had was worse than it could have been. Nonetheless, we were able to organize a response rapidly during the outbreak. By describing our successes and failures, we hope to help others to learn and avoid the problems we encountered as they develop their own disaster management plans in anticipation of similar future situations.
Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning
NASA Technical Reports Server (NTRS)
1972-01-01
The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.
ERIC Educational Resources Information Center
McManis, Gerald L.
The purpose of this manual is to offer assistance to colleges and universities involved with, or interested in, improvement in their fundamental administrative process in a manner compatible with the Planning, Management and Evaluation System (PME) approach articulated by the United States Office of Education. Planning is defined as that…
ERIC Educational Resources Information Center
Lyons, Raymond F.
One of the main inadequacies in educational management is that planning is not firmly integrated within administration. Five basic processes may be distinguished in administration. The first is planning, or determining what shall be done. The second element of the administrative process is organizing, or defining the administrative structures and…
Research Perspectives for Material Requirements Planning Systems. Paper No. 434.
ERIC Educational Resources Information Center
Berry, W. L.; Whybark, D. Clay
Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…
Dengue Contingency Planning: From Research to Policy and Practice.
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini
2016-09-01
Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.
Results from a national survey on chronic care management by health plans.
Mattke, Soeren; Higgins, Aparna; Brook, Robert
2015-05-01
The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.
An accountable fistula management treatment plan.
Thompson, Mary Jo; Epanomeritakis, Emanuel
An accountable fistula management treatment plan focuses on combining effective medical and nursing treatment with effective and efficient pouching technique and equipment to ensure patient comfort. Small bowel fistula following abdominal surgery can provide challenges in patients' medical and nursing management. This article describes a case study of the successful medical and nursing management of a patient post-abdominal surgery. Within days of surgery a small bowel fistula formed within an abdominal wound. Medical management involved the use of total parenteral nutrition, electrolyte balance management, nil orally and Sandostatin medication. The nursing interventions comprised accurate intake and output measurement, effective and efficient pouching systems and appropriate psychological care. The medical and nursing interventions provided during the healing process are outlined together with the assessment and evaluation of a new innovative wound management pouch. This system proved invaluable in the successful containment of a high small bowel effluent and skin preservation. In an attempt to share best practice a pictorial guide is provided to demonstrate the correct application of the pouching system and technique. This article provides details of an accountable fistula management treatment plan which resulted in the successful spontaneous closure of the small bowel fistula coupled with excellent cost-effectiveness and patient comfort.
Designing the role of the embedded care manager.
Hines, Patricia; Mercury, Marge
2013-01-01
: The role of the professional case manager is changing rapidly. Health reform has called upon the industry to ensure that care is delivered in an efficient, effective, and high-quality and low cost manner. As a means to achieve this objective, health plans and health systems are moving the care manager out of a centralized location within their organizations to "embedding" them into physician offices. This move enables the care manager to work alongside the primary care physicians and their high-risk patients. This article discusses the framework for designing and implementing an embedded care manager role into a physician practice. Key elements of the program are discussed. IMPLICATIONS FOR CARE MANAGEMENT:: Historically care management has played a foundational role in improving the quality of care for individuals and populations via the efficient and effective use of resources. Now with the goals of health care reform, a successful transition from a volume-based to value-based reimbursement system requires primary care physicians to welcome care managers into their practices to improve patient care, quality, and costs through care coordination across health care settings and populations. : As patient-centered medical homes and integrated delivery systems formulate their plans for population health management, their efforts have included embedding a care manager in the primary practice setting. Having care managers embedded at the physician offices increases their ability to collaborate with the physician and their staff in the implementation and monitoring care plans for their patients. : Implementing an embedded care manager into an existing physician's practice requires the following:Although the embedded care manager is a highly evolving role, physician groups are beginning to realize the benefits from their care management collaborations. Examples cited include improved outreach and coordination, patient adherence to care plans, and improved quality of life.
Improving processes through evolutionary optimization.
Clancy, Thomas R
2011-09-01
As systems evolve over time, their natural tendency is to become increasingly more complex. Studies on complex systems have generated new perspectives on management in social organizations such as hospitals. Much of this research appears as a natural extension of the cross-disciplinary field of systems theory. This is the 18th in a series of articles applying complex systems science to the traditional management concepts of planning, organizing, directing, coordinating, and controlling. In this article, I discuss methods to optimize complex healthcare processes through learning, adaptation, and evolutionary planning.
ADP SYSTEMS ANALYSIS - COMMITTED VS. AVAILABLE MILITARY TRANSPORTATION (LMI T1).
LOGISTICS , * MANAGEMENT ENGINEERING), (*DATA PROCESSING, LOGISTICS), INFORMATION RETRIEVAL, SYSTEMS ENGINEERING, MILITARY TRANSPORTATION, CARGO VEHICLES, SCHEDULING, COMPUTER PROGRAMMING, MANAGEMENT PLANNING AND CONTROL
Comparative Risk Analysis for Metropolitan Solid Waste Management Systems
NASA Astrophysics Data System (ADS)
Chang, Ni-Bin; Wang, S. F.
1996-01-01
Conventional solid waste management planning usually focuses on economic optimization, in which the related environmental impacts or risks are rarely considered. The purpose of this paper is to illustrate the methodology of how optimization concepts and techniques can be applied to structure and solve risk management problems such that the impacts of air pollution, leachate, traffic congestion, and noise increments can be regulated in the iong-term planning of metropolitan solid waste management systems. Management alternatives are sequentially evaluated by adding several environmental risk control constraints stepwise in an attempt to improve the management strategies and reduce the risk impacts in the long run. Statistics associated with those risk control mechanisms are presented as well. Siting, routing, and financial decision making in such solid waste management systems can also be achieved with respect to various resource limitations and disposal requirements.
Artificial intelligence - New tools for aerospace project managers
NASA Technical Reports Server (NTRS)
Moja, D. C.
1985-01-01
Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.
Management information systems in the HMO environment.
Neal, P A
1982-01-01
Realization of the unique potential of a health maintenance organization is dependent on the availability of adequate, accurate, and timely information. The particular data needed are determined by the structure of the organization; the physician compensation plans; requirements for state, federal, or other reporting; and many other factors. The author introduces the concept and objectives of the HMO, and presents the management information systems necessary for planning and monitoring HMO performance: patient information, utilization information, and management information for the staff and nonstaff HMO.
1978-10-01
Information ; Logistics Planning; Management Planning and Control; Management Information Systems; Management; Military Supplies; Acquisition; JO...Arlington, Virginia 22202 Contract DAHC 15-73C-0200 Task 78-II-1 CONTENTS GLOSSARY : v SUMMARY ix I. INTRODUCTION 1 II. MARINE CORPS SUPPORT OP...Materiel Command Navy Cost Information System/FYDP Subsystem Non-Industrial Fund Non-Telecommunications Offfice of the Assistant Secretary of Defense
2017-01-01
UNMANNED AERIAL SYSTEMS Air Force and Army Should Improve Strategic Human Capital Planning for Pilot Workforces...Should Improve Strategic Human Capital Planning for Pilot Workforces What GAO Found The Air Force and the Army have not fully applied four of the five...key principles for effective strategic human capital planning for managing pilots of unmanned aerial systems (UAS) that are important for resolving
NASA Technical Reports Server (NTRS)
Tompkins, F. G.
1983-01-01
This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.
40 CFR 63.11495 - What are the management practices and other requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... repair. (b) Small heat exchange systems. For each heat exchange system subject to this subpart with a...) You must develop and operate in accordance with a heat exchange system inspection plan. The plan must...
40 CFR 63.11495 - What are the management practices and other requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... repair. (b) Small heat exchange systems. For each heat exchange system subject to this subpart with a...) You must develop and operate in accordance with a heat exchange system inspection plan. The plan must...
Congestion management system/IVHS program study Birmingham, Alabama : phase 1, report
DOT National Transportation Integrated Search
1995-04-01
The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...
Congestion Management System/IVHS Program Study for Birmingham, Alabama. Phase 1 Report
DOT National Transportation Integrated Search
1995-04-01
The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...
ERIC Educational Resources Information Center
Social and Rehabilitation Service (DHEW), Washington, DC.
The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…
ERIC Educational Resources Information Center
Martin, Christopher J.
2012-01-01
Three decades of research has indicated that strategic information systems planning is a vital component to business success. The purpose of this study was to identify the relationship strategic information systems planning and financial commitment has within the K-12 public education sector. Data for this study was obtained from top management of…
Software And Systems Engineering Risk Management
2010-04-01
RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software
An approach to improve management visibility within the procurement and financial group at Goldstone
NASA Technical Reports Server (NTRS)
Maiocco, F. R.; Rozek, J. B.
1976-01-01
Improvements in the operational efficiency of the data management systems at the Goldstone Deep Space Communications Complex (GDSCC) are discussed. This addresses the existing procurement and financial management data system at GDSCC, identifies management requirements for better visibility, describes a proposed computerized data management system, summarizes results to data, and identifies plans for future development.
Assessment of reservoir system variable forecasts
NASA Astrophysics Data System (ADS)
Kistenmacher, Martin; Georgakakos, Aris P.
2015-05-01
Forecast ensembles are a convenient means to model water resources uncertainties and to inform planning and management processes. For multipurpose reservoir systems, forecast types include (i) forecasts of upcoming inflows and (ii) forecasts of system variables and outputs such as reservoir levels, releases, flood damage risks, hydropower production, water supply withdrawals, water quality conditions, navigation opportunities, and environmental flows, among others. Forecasts of system variables and outputs are conditional on forecasted inflows as well as on specific management policies and can provide useful information for decision-making processes. Unlike inflow forecasts (in ensemble or other forms), which have been the subject of many previous studies, reservoir system variable and output forecasts are not formally assessed in water resources management theory or practice. This article addresses this gap and develops methods to rectify potential reservoir system forecast inconsistencies and improve the quality of management-relevant information provided to stakeholders and managers. The overarching conclusion is that system variable and output forecast consistency is critical for robust reservoir management and needs to be routinely assessed for any management model used to inform planning and management processes. The above are demonstrated through an application from the Sacramento-American-San Joaquin reservoir system in northern California.
A Smartwatch-Driven Medication Management System Compliant to the German Medication Plan.
Keil, Andreas; Gegier, Konstantin; Pobiruchin, Monika; Wiesner, Martin
2016-01-01
Medication adherence is an important factor for the outcome of medical therapies. To support high adherence levels, smartwatches can be used to assist the patient. However, a successful integration of such devices into clinicians' or general practitioners' information systems requires the use of standards. In this paper, a medication management system supplied with smartwatch generated feedback events is presented. It allows physicians to manage their patients' medications and track their adherence in real time. Moreover, it fosters interoperability via a ISO/IEC 16022 data matrix which encodes related medication data in compliance with the German Medication Plan specification.
NASA Technical Reports Server (NTRS)
Knighton, Donna L.
1992-01-01
A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.
Standardized emergency management system and response to a smallpox emergency.
Kim-Farley, Robert J; Celentano, John T; Gunter, Carol; Jones, Jessica W; Stone, Rogelio A; Aller, Raymond D; Mascola, Laurene; Grigsby, Sharon F; Fielding, Jonathan E
2003-01-01
The smallpox virus is a high-priority, Category-A agent that poses a global, terrorism security risk because it: (1) easily can be disseminated and transmitted from person to person; (2) results in high mortality rates and has the potential for a major public health impact; (3) might cause public panic and social disruption; and (4) requires special action for public health preparedness. In recognition of this risk, the Los Angeles County Department of Health Services (LAC-DHS) developed the Smallpox Preparedness, Response, and Recovery Plan for LAC to prepare for the possibility of an outbreak of smallpox. A unique feature of the LAC-DHS plan is its explicit use of the Standardized Emergency Management System (SEMS) framework for detailing the functions needed to respond to a smallpox emergency. The SEMS includes the Incident Command System (ICS) structure (management, operations, planning/intelligence, logistics, and finance/administration), the mutual-aid system, and the multi/interagency coordination required during a smallpox emergency. Management for incident command includes setting objectives and priorities, information (risk communications), safety, and liaison. Operations includes control and containment of a smallpox outbreak including ring vaccination, mass vaccination, adverse events monitoring and assessment, management of confirmed and suspected smallpox cases, contact tracing, active surveillance teams and enhanced hospital-based surveillance, and decontamination. Planning/intelligence functions include developing the incident action plan, epidemiological investigation and analysis of smallpox cases, and epidemiological assessment of the vaccination coverage status of populations at risk. Logistics functions include receiving, handling, inventorying, and distributing smallpox vaccine and vaccination clinic supplies; personnel; transportation; communications; and health care of personnel. Finally, finance/administration functions include monitoring costs related to the smallpox emergency, procurement, and administrative aspects that are not handled by other functional divisions of incident command systems. The plan was developed and is under frequent review by the LAC-DHS Smallpox Planning Working Group, and is reviewed periodically by the LAC Bioterrorism Advisory Committee, and draws upon the Smallpox Response Plan and Guidelines of the Centers for Disease Control and Prevention (CDC) and recommendations of the Advisory Committee on Immunization Practices (ACIP). The Smallpox Preparedness, Response, and Recovery Plan, with its SEMS framework and ICS structure, now is serving as a model for the development of LAC-DHS plans for responses to other terrorist or natural-outbreak responses.
36 CFR 219.18 - Role of advisory committees.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for... variety of public purposes, particularly those groups organized to develop landscape goals (§ 219.12(b...
Code of Federal Regulations, 2011 CFR
2011-01-01
... each Farm Credit System institution shall adopt an operational and strategic business plan for at least... the planning period. The review must include: (i) An assessment of management capabilities, (ii) An...
Environmental Management Systems: A Framework for Planning Green Campuses.
ERIC Educational Resources Information Center
Keniry, Julian
2003-01-01
Drawing on recent survey data from the National Wildlife Federation and other publications, explains what an environmental management system is and identifies its components; examines how environmental management systems have been applied in higher education settings; reports on trends in implementation; and illustrates how the environmental…
Code of Federal Regulations, 2010 CFR
2010-07-01
... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real Property Disposal Property for Providing Self... disposal agency take after an eligible public agency has submitted a plan of use for property for a self...
78 FR 55284 - Privacy Act of 1974, as Amended; Notice of a New System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
... of records to the Office of Management and Budget and to Congress. III. Public Disclosure Before... Agency Accounting and Other Financial Management Reports and Plans; 5 U.S.C. 4111, Acceptance of..., Executive agency accounting and other financial management reports and plans; 31 U.S.C. 3711, Collection and...
From an automated flight-test management system to a flight-test engineer's workstation
NASA Technical Reports Server (NTRS)
Duke, E. L.; Brumbaugh, R. W.; Hewett, M. D.; Tartt, D. M.
1992-01-01
Described here are the capabilities and evolution of a flight-test engineer's workstation (called TEST PLAN) from an automated flight-test management system. The concept and capabilities of the automated flight-test management system are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.
Planning for management information systems in drug treatment organizations.
Zalkind, D; Zelon, H; Moore, M; Kaluzny, A
1979-02-01
An attempt to set up a management information system for individual drug abuse programs throughout a state is described. The principles upon which the system is based are discussed along with the problems encountered in its implementation. A series of guidelines for establishing management information systems in operating human services agencies is included.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... National Forest System Land Management Planning Rule AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The National Advisory Committee for Implementation of the National Forest System Land... implementation of the National Forest System Land Management Rule. The meeting is open to the public. The purpose...
Benchmarking the State of Kosrae's Education Management Information System. REL 2017-174
ERIC Educational Resources Information Center
Kendall, John S.; Dandapani, Nitara; Cicchinelli, Louis F.
2016-01-01
A quality data management system, such as an education management information system (EMIS), a state longitudinal data system, or a data warehouse, is key to ensuring that education policy, planning, and strategy decisions are grounded in accurate information (Data Quality Campaign, 2010; Mohamed, Kadir, May-Lin, Rahman, & Arshad, 2009;…
Benchmarking the State of Chuuk's Education Management Information System. REL 2017-176
ERIC Educational Resources Information Center
Kendall, John S.; Dandapani, Nitara; Cicchinelli, Louis F.
2016-01-01
A quality data management system, such as an education management information system (EMIS), a state longitudinal data system, or a data warehouse, is key to ensuring that education policy, planning, and strategy decisions are grounded in accurate information (Data Quality Campaign, 2010; Mohamed, Kadir, May-Lin, Rahman, & Arshad, 2009;…
Benchmarking the State of Yap's Education Management Information System. REL 2016-117
ERIC Educational Resources Information Center
Cicchinelli, Louis F.; Kendall, John S.; Dandapani, Nitara
2016-01-01
A quality data management system, such as an education management information system (EMIS), a state longitudinal data system, or a data warehouse, is key to ensuring that education policy, planning, and strategy decisions are grounded in accurate information. The chief state school officers of the Federated States of Micronesia have recognized…
Benchmarking the State of Pohnpei's Education Management Information System. REL 2017-175
ERIC Educational Resources Information Center
Kendall, John S.; Dandapani, Nitara; Cicchinelli, Louis F.
2016-01-01
A quality data management system, such as an education management information system (EMIS), a state longitudinal data system, or a data warehouse, is key to ensuring that education policy, planning, and strategy decisions are grounded in accurate information (Data Quality Campaign, 2010; Mohamed, Kadir, May-Lin, Rahman, & Arshad, 2009;…
From an automated flight-test management system to a flight-test engineer's workstation
NASA Technical Reports Server (NTRS)
Duke, E. L.; Brumbaugh, Randal W.; Hewett, M. D.; Tartt, D. M.
1991-01-01
The capabilities and evolution is described of a flight engineer's workstation (called TEST-PLAN) from an automated flight test management system. The concept and capabilities of the automated flight test management systems are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.
An Approach and Instrumentation for Management System Analysis
1974-10-01
Benefit Analysis Systems Analysis Manpower Planning Resource Planning Information Theory 20. ABSTRACT (Conlliwa on ravaraa alda It nacaaaary...participants the data necessary to trace both formal and informal information flows and make cost- benefit judgments about specific communications. The...network within a manage- ment structure and to provide a basis tor preliminary cost- benefit evaluations. This objective was in response to Phase I of the
2012-02-13
Operations DCMO Deputy Chief Management Officer DDRS Defense Departmental Reporting System DFAS Defense Finance and Accounting Service ERP Enterprise...for your review and comment. The Navy approved deployment of the Navy Enterprise Resource Planning ( ERP ) System without ensuring it complied with the...Comments from the Deputy Assistant Secretary of the Navy (Financial Management and Comptroller, Office of Financial Operations) and the Navy ERP Program
Management Architecture and Solutions for French Tactical Systems
2006-10-01
RTO-MP-IST-062 3 - 1 UNCLASSIFIED/UNLIMITED UNCLASSIFIED/UNLIMITED Management Architecture and Solutions for French Tactical Systems Vincent...COTTIGNIES THALES Land & Joint Systems – Battlespace Transformation Center 160 Boulevard de Valmy - BP 82 92704 Colombes Cedex FRANCE ...planning, configuration and monitoring of Systems. Then, given the limitations of existing Management System Architecture, an innovative design based on
45 CFR 205.36 - State plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... aid or services is changed. (c) To electronically refer and exchange information with programs under...
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2014 CFR
2014-04-01
...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2012 CFR
2012-04-01
...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2013 CFR
2013-04-01
...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...
Vulnerability Management for an Enterprise Resource Planning System
NASA Astrophysics Data System (ADS)
Goel, Shivani; Kiran, Ravi; Garg, Deepak
2012-09-01
Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.
Weather variability and adaptive management for rangeland restoration
USDA-ARS?s Scientific Manuscript database
Inherent weather variability in upland rangeland systems requires relatively long-term goal setting, and contingency planning for partial success or failure in any given year. Rangeland plant communities are dynamic systems and successional planning is essential for achieving and maintaining system...
ERIC Educational Resources Information Center
Farmer, D. W.
1983-01-01
An effective collegial and relatively noncompetitive approach to integrated planning developed at King's College is discussed. The development of a structured system of intensive oral communication; an organizational design integrating planning, budgeting, marketing, and evaluation, and a modified matrix management system are described. (MLW)
Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.
Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan
2017-03-01
Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.
Halon 1301 management planning guidance
NASA Astrophysics Data System (ADS)
1995-05-01
This ETL provides guidance to help the Base Civil Engineer (BCE) and other users manage inventories of Halon 1301, an ozone depleting substance used in many facility fire protection systems. This guidance will allow Halon 1301 users to develop the transition plans necessary to implement the DOD and Air Force policies on ozone depleting substances. Attachment 3 to this ETL contains detailed instructions on how to develop a Base Halon 1 301 Management Plan and comply with Air Force policies and regulations designed to minimize dependency on Halon 1301.
A systems engineering management approach to resource management applications
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda Shaller
1989-01-01
The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Planning occurs at three levels—national strategic planning, NFS unit planning, and project or activity... measures, and strategies for management of the NFS, as well as the other Forest Service mission areas... System unit planning. (1) NFS unit planning results in the development, amendment, or revision of a land...
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Planning occurs at three levels—national strategic planning, NFS unit planning, and project or activity... measures, and strategies for management of the NFS, as well as the other Forest Service mission areas... System unit planning. (1) NFS unit planning results in the development, amendment, or revision of a land...
Analysis of the Apollo spacecraft operational data management system. Executive summary
NASA Technical Reports Server (NTRS)
1971-01-01
A study was made of Apollo, Skylab, and several other data management systems to determine those techniques which could be applied to the management of operational data for future manned spacecraft programs. The results of the study are presented and include: (1) an analysis of present data management systems, (2) a list of requirements for future operational data management systems, (3) an evaluation of automated data management techniques, and (4) a plan for data management applicable to future space programs.
NASA Astrophysics Data System (ADS)
Hoverman, Suzanne; Ayre, Margaret
2012-12-01
SummaryIndigenous land owners of the Tiwi Islands, Northern Territory Australia have begun the first formal freshwater allocation planning process in Australia entirely within Indigenous lands and waterways. The process is managed by the Northern Territory government agency responsible for water planning, the Department of Natural Resources, Environment, The Arts and Sport, in partnership with the Tiwi Land Council, the principal representative body for Tiwi Islanders on matters of land and water management and governance. Participatory planning methods ('tools') were developed to facilitate community participation in Tiwi water planning. The tools, selected for their potential to generate involvement in the planning process needed both to incorporate Indigenous knowledge of water use and management and raise awareness in the Indigenous community of Western science and water resources management. In consultation with the water planner and Tiwi Land Council officers, the researchers selected four main tools to develop, trial and evaluate. Results demonstrate that the tools provided mechanisms which acknowledge traditional management systems, improve community engagement, and build confidence in the water planning process. The researchers found that participatory planning approaches supported Tiwi natural resource management institutions both in determining appropriate institutional arrangements and clarifying roles and responsibilities in the Islands' Water Management Strategy.
Managing risks and hazardous in industrial operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Almaula, S.C.
1996-12-31
The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 tomore » $200,000. 3 refs., 2 figs., 1 tab.« less
Managed care redux: health plans shift responsibilities to consumers.
Draper, Debra A; Claxton, Gary
2004-03-01
Confronted with conflicting pressures to stem double-digit premium increases and provide unfettered access to care, health plans are developing products that shift more financial and care management responsibilities to consumers, according to findings from the Center for Studying Health System Change's (HSC) 2002-03 site visits to 12 nationally representative communities. Plans are pursuing these strategies in collaboration with employers that want to gain control over rapidly rising premiums while continuing to respond to employee demands for less restrictive managed care practices. Mindful of the managed care backlash, health plans also are stepping up utilization management activities for high-cost services and focusing care management on high-cost patients. While the move toward greater consumer engagement is clear, the impact on costs and consumer willingness to assume these new responsibilities remain to be seen.
2012-04-01
5. Realign the TRICARE Management Activity and establish a Joint Military Health Service Directorate to consolidate shared services and common...Directorate to consolidate shared services and common functions Realign TRICARE Management Activity and establish a TRICARE Health Plan Agency to...Uniformed Services University of the Health Sciences, (2) TRICARE health plan, (3) Health Management Support, and (4) Shared Services division
An Exploration of Radiation Physics in Electromagnetics
NASA Technical Reports Server (NTRS)
Lee, Katherine K.
2005-01-01
Contents include the following: NASA's Missions and Aeronautics Research. Today's Air Traffic Control System. Development of Decision-Support Tools. The Center-TRACON Automation System (CTAS). The Traffic Management Advisor (TMA). The Multi-Center Traffic Management Advisor (McTMA). The Surface Management System (SMS). Future Directions: The Joint Planning and Development Office.
Incident Management: Process into Practice
ERIC Educational Resources Information Center
Isaac, Gayle; Moore, Brian
2011-01-01
Tornados, shootings, fires--these are emergencies that require fast action by school district personnel, but they are not the only incidents that require risk management. The authors have introduced the National Incident Management System (NIMS) and the Incident Command System (ICS) and assured that these systems can help educators plan for and…
The Impending Revolution in School Business Management.
ERIC Educational Resources Information Center
James, H. Thomas
The development of logically sophisticated analytical models in a growing number of fields has placed new emphasis on efficiency in school management. Recent systems models guiding the longrun analysis of school management in terms of efficiency--through cost-benefit studies, systems analysis, and program planning and budgeting systems--are in…
Hendriks, Michelle; Spreeuwenberg, Peter; Rademakers, Jany; Delnoij, Diana M J
2009-09-17
Many countries have introduced elements of managed competition in their healthcare system with the aim to accomplish more efficient and demand-driven health care. Simultaneously, generating and reporting of comparative healthcare information has become an important quality-improvement instrument. We examined whether the introduction of managed competition in the Dutch healthcare system along with public reporting of quality information was associated with performance improvement in health plans. Experiences of consumers with their health plan were measured in four consecutive years (2005-2008) using the CQI(R) health plan instrument 'Experiences with Healthcare and Health Insurer'. Data were available of 13,819 respondents (response = 45%) of 30 health plans in 2005, of 8,266 respondents (response = 39%) of 32 health plans in 2006, of 8,088 respondents (response = 34%) of 32 health plans in 2007, and of 7,183 respondents (response = 31%) of 32 health plans in 2008. We performed multilevel regression analyses with three levels: respondent, health plan and year of measurement. Per year and per quality aspect, we estimated health plan means while adjusting for consumers' age, education and self-reported health status. We tested for linear and quadratic time effects using chi-squares. The overall performance of health plans increased significantly from 2005 to 2008 on four quality aspects. For three other aspects, we found that the overall performance first declined and then increased from 2006 to 2008, but the performance in 2008 was not better than in 2005. The overall performance of health plans did not improve more often for quality aspects that were identified as important areas of improvement in the first year of measurement. On six out of seven aspects, the performance of health plans that scored below average in 2005 increased more than the performance of health plans that scored average and/or above average in that year. We found mixed results concerning the effects of managed competition on the performance of health plans. To determine whether managed competition in the healthcare system leads to quality improvement in health plans, it is important to examine whether and for what reasons health plans initiate improvement efforts.
NASA Astrophysics Data System (ADS)
Azarov, A. V.; Zhukova, N. S.; Kozlovtseva, E. Yu; Dobrinsky, D. R.
2018-05-01
The article considers obtaining mathematical models to assess the efficiency of the dust collectors using an integrated system of analysis and data management STATISTICA Design of Experiments. The procedure for obtaining mathematical models and data processing is considered by the example of laboratory studies on a mounted installation containing a dust collector in counter-swirling flows (CSF) using gypsum dust of various fractions. Planning of experimental studies has been carried out in order to reduce the number of experiments and reduce the cost of experimental research. A second-order non-position plan (Box-Bencken plan) was used, which reduced the number of trials from 81 to 27. The order of statistical data research of Box-Benken plan using standard tools of integrated system for analysis and data management STATISTICA Design of Experiments is considered. Results of statistical data processing with significance estimation of coefficients and adequacy of mathematical models are presented.
NASA Technical Reports Server (NTRS)
Pryor, H. E.
1975-01-01
Current problems and future trends in information management are briefly summarized in relation to scientific and technical information management systems and management of management information (planning, marketing, and operations).
Plan for the Characterization of HIRF Effects on a Fault-Tolerant Computer Communication System
NASA Technical Reports Server (NTRS)
Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Miner, Paul S.; Koppen, Sandra V.
2008-01-01
This report presents the plan for the characterization of the effects of high intensity radiated fields on a prototype implementation of a fault-tolerant data communication system. Various configurations of the communication system will be tested. The prototype system is implemented using off-the-shelf devices. The system will be tested in a closed-loop configuration with extensive real-time monitoring. This test is intended to generate data suitable for the design of avionics health management systems, as well as redundancy management mechanisms and policies for robust distributed processing architectures.
Integrating emergency services in an urban health system.
Radloff, D; Blouin, A S; Larsen, L; Kripp, M E
2000-03-01
When planning for growth and management efficiency across urban health systems, economic and market factors present significant service line challenges and opportunities. This article describes the evolutionary integration of emergency services in St John Health System, a large, religious-sponsored health care system located in Detroit, Michigan. Critical business elements, including the System's vision, mission, and economic context, are defined as the framework for site-specific and System-wide planning. The impact of managed care and market changes prompted St John's clinicians and executives to explore how integrating emergency services could create a competitive market advantage.
Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...
Code of Federal Regulations, 2011 CFR
2011-01-01
... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...
Code of Federal Regulations, 2010 CFR
2010-01-01
... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...
75 FR 1405 - National Park Service
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
...: Notice of availability of the Record of Decision for the General Management Plan/Environmental Impact...) announces the availability of a Record of Decision (ROD) for the General Management Plan/Environmental... Arch grounds by water taxi. A new external and internal visitor transportation system will be designed...
NASA Astrophysics Data System (ADS)
The U.S. Integrated ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and communications (DMAC) component. The deadline for receipt of comments has been extended to 18 November 2003.
DOT National Transportation Integrated Search
2016-11-01
Post-Deployment Analysis, Modeling, and Simulation (AMS) activities focus on identifying impacts and benefits of the as-deployed Integrated Corridor Management (ICM) system. The as-deployed ICM strategies may differ from as-planned ...
DOT National Transportation Integrated Search
2016-10-01
Post-Deployment Analysis, Modeling, and Simulation (AMS) activities focus on identifying impacts and benefits of the as-deployed Integrated Corridor Management (ICM) system. The as-deployed ICM strategies may differ from as-planned ...
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...
Code of Federal Regulations, 2012 CFR
2012-04-01
... that the parties involved in carrying out the planning, programming and management systems processes... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems § 470.103 Definitions. Except as otherwise provided in this part, terms defined in 23 U.S...
46 CFR 62.20-3 - Plans for information.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-based system hardware. (3) Safety controls. (4) Automated electric power management. (5) Automation... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Plan... Officer in Charge, Marine Inspection, for use in the evaluation of automated systems provided to replace...
International Space Station Alpha user payload operations concept
NASA Technical Reports Server (NTRS)
Schlagheck, Ronald A.; Crysel, William B.; Duncan, Elaine F.; Rider, James W.
1994-01-01
International Space Station Alpha (ISSA) will accommodate a variety of user payloads investigating diverse scientific and technology disciplines on behalf of five international partners: Canada, Europe, Japan, Russia, and the United States. A combination of crew, automated systems, and ground operations teams will control payload operations that require complementary on-board and ground systems. This paper presents the current planning for the ISSA U.S. user payload operations concept and the functional architecture supporting the concept. It describes various NASA payload operations facilities, their interfaces, user facility flight support, the payload planning system, the onboard and ground data management system, and payload operations crew and ground personnel training. This paper summarizes the payload operations infrastructure and architecture developed at the Marshall Space Flight Center (MSFC) to prepare and conduct ISSA on-orbit payload operations from the Payload Operations Integration Center (POIC), and from various user operations locations. The authors pay particular attention to user data management, which includes interfaces with both the onboard data management system and the ground data system. Discussion covers the functional disciplines that define and support POIC payload operations: Planning, Operations Control, Data Management, and Training. The paper describes potential interfaces between users and the POIC disciplines, from the U.S. user perspective.
Values and attitudes of National Wildlife Refuge managers and biologists; Report to respondents
Brinson, Ayeisha A.; Benson, Delwin E.
2002-01-01
Analyses of data revealed that these managers and biologists did not differ substantially in terms of their environmental values. Refuge professionals were supportive of public involvement in planning and management, but hoped to maintain management authority throughout the process. Professionals were skeptical concerning the applicability of long term planning, but were generally supportive of the planning process. Attitudes toward the Service were conflicting: professionals felt that the Service needed to provide better leadership and direction, but that the Refuge System needed to assert its autonomy and independence from the rest of the Service.
NASA Technical Reports Server (NTRS)
Maiocco, F. R.; Hume, J. P.
1976-01-01
A system's approach is outlined in the paper to assist facility and Plant Engineers improve their organization's data management system. The six basic steps identified may appear somewhat simple; however, adequate planning, proper resources, and the involvement of management will determine the success of a computerized facility management data base. Helpful suggestions are noted throughout the paper to insure the development of a practical computerized data management system.
Handling Emergency Management in [an] Object Oriented Modeling Environment
NASA Technical Reports Server (NTRS)
Tokgoz, Berna Eren; Cakir, Volkan; Gheorghe, Adrian V.
2010-01-01
It has been understood that protection of a nation from extreme disasters is a challenging task. Impacts of extreme disasters on a nation's critical infrastructures, economy and society could be devastating. A protection plan itself would not be sufficient when a disaster strikes. Hence, there is a need for a holistic approach to establish more resilient infrastructures to withstand extreme disasters. A resilient infrastructure can be defined as a system or facility that is able to withstand damage, but if affected, can be readily and cost-effectively restored. The key issue to establish resilient infrastructures is to incorporate existing protection plans with comprehensive preparedness actions to respond, recover and restore as quickly as possible, and to minimize extreme disaster impacts. Although national organizations will respond to a disaster, extreme disasters need to be handled mostly by local emergency management departments. Since emergency management departments have to deal with complex systems, they have to have a manageable plan and efficient organizational structures to coordinate all these systems. A strong organizational structure is the key in responding fast before and during disasters, and recovering quickly after disasters. In this study, the entire emergency management is viewed as an enterprise and modelled through enterprise management approach. Managing an enterprise or a large complex system is a very challenging task. It is critical for an enterprise to respond to challenges in a timely manner with quick decision making. This study addresses the problem of handling emergency management at regional level in an object oriented modelling environment developed by use of TopEase software. Emergency Operation Plan of the City of Hampton, Virginia, has been incorporated into TopEase for analysis. The methodology used in this study has been supported by a case study on critical infrastructure resiliency in Hampton Roads.
Use of business planning methods to monitor global health budgets in Turkmenistan.
Ensor, T.; Amannyazova, B.
2000-01-01
After undergoing many changes, the financing of health care in countries of the former Soviet Union is now showing signs of maturing. Soon after the political transition in these countries, the development of insurance systems and fee-for-service payment systems dominated the discussions on health reform. At present there is increasing emphasis on case mix adjusted payments in larger hospitals and on global budgets in smaller district hospitals. The problem is that such systems are often mistrusted for not providing sufficient financial control. At the same time, unless further planned restructuring is introduced, payment systems cannot on their own induce the fundamental change required in the health care system. As described in this article, in Tejen etrap (district), Turkmenistan, prospective business plans, which link planned objectives and activities with financial allocations, provide a framework for setting and monitoring budget expenditure. Plans can be linked to the overall objectives of the restructuring system and can be used to ensure sound financial management. The process of business planning, which calls for a major change in the way health facilities examine their activities, can be used as a vehicle to increase awareness of management issues. It also provides a way of satisfying the requirement for a rigorous, bottom-up planning of financial resources. PMID:10994288
Developing a health information network within an integrated delivery system: a case study.
Wager, K A; Heda, S; Austin, C J
1997-05-01
Changes in the health care environment, such as the growth of integrated delivery systems and the proliferation of managed care, are having a profound impact on the way in which health care organizations manage both clinical and financial information. Health information networks (HINs) are emerging to support the goals and internal needs of integrated delivery systems. In this environment, health care managers must assume a leadership role in planning for the development of HINs. The article provides an overview of the principal issues that should be addressed in an organization's information systems plan when a HIN is being developed and includes a case study that illustrates the key points discussed.
Geographic Information System Tools for Conservation Planning: User's Manual
Fox, Timothy J.; Rohweder, Jason J.; Kenow, K.P.; Korschgen, C.E.; DeHaan, H.C.
2003-01-01
Public and private land managers desire better ways to incorporate landscape, species, and habitat relations into their conservation planning processes. We present three tools, developed for the Environmental Systems Research Institute?s ArcView 3.x platform, applicable to many types of wildlife conservation management and planning efforts. These tools provide managers and planners with the ability to rapidly assess landscape attributes and link these attributes with species-habitat information. To use the tools, the user provides a detailed land cover spatial database and develops a matrix to identify species-habitat relations for the landscape of interest. The tools are applicable to any taxa or suite of taxa for which the required data are available. The user also has the ability to interactively make polygon-specific changes to the landscape and re-examine species-habitat relations. The development of these tools has given resource managers the means to evaluate the merits of proposed landscape management scenarios and to choose the scenario that best fits the goals of the managed area.
Lonsdale, Jemma-Anne; Weston, Keith; Barnard, Steve; Boyes, Suzanne J; Elliott, Michael
2015-11-15
Estuaries are important because of their multiple uses and users which often makes them challenging to manage since management must strike a balance between the needs of users, the estuaries' ecological and economic value and the context of multiple legislative drivers. To facilitate management we have therefore developed an Estuarine Planning Support System (EPSS) framework using the Humber Estuary, Eastern England, as a case study which integrates the current legislation tools and concepts. This integrated EPSS framework is an improvement on previous approaches for assessing cumulative impacts as it takes into account legislative drivers, management tools and other mechanisms for controlling plans/projects specific to the estuary. It therefore enables managers and users to assess and address both the current state and the way in which a new industrial, port or urban development could impact an estuary in an accessible and understandable framework. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.
Best Practices for Audit and Financial Advisory Committees Within the Department of Defense
2007-12-06
oversight of an organization’s annual financial statement audit, risk management plan, internal control framework, and compliance with external...is generally responsible for providing independent oversight of an organization’s annual financial statement audit, risk management plan, internal...achieving financial management objectives and identify areas of risk or concern. 40 11.2. Systems of Internal Controls
ERIC Educational Resources Information Center
Collier, Douglas J., Ed.
Papers concerning higher education planning and management in the 1980s that were contributed to the National Center for Higher Education Management Systems competition for the Planning and Financing Program are presented. The papers, submitted by administrators, researchers, and a student, are as follows: "Faculty Reallocation: Plattsburgh…
ArcFuels: an ArcMap toolbar for fuel treatment planning and wildfire risk assessment
Nicole M. Vaillant; Alan A. Ager
2014-01-01
Fire behavior modeling and geospatial analysis can provide tremendous insight to land managers in defining both the benefits and potential impacts of fuel treatments in the context of land management goals and public expectations. ArcFuels is a streamlined fuel management planning and wildfire risk assessment system that creates a trans-scale (stand to large landscape...
Chen, Xiujuan; Huang, Guohe; Zhao, Shan; Cheng, Guanhui; Wu, Yinghui; Zhu, Hua
2017-11-01
In this study, a stochastic fractional inventory-theory-based waste management planning (SFIWP) model was developed and applied for supporting long-term planning of the municipal solid waste (MSW) management in Xiamen City, the special economic zone of Fujian Province, China. In the SFIWP model, the techniques of inventory model, stochastic linear fractional programming, and mixed-integer linear programming were integrated in a framework. Issues of waste inventory in MSW management system were solved, and the system efficiency was maximized through considering maximum net-diverted wastes under various constraint-violation risks. Decision alternatives for waste allocation and capacity expansion were also provided for MSW management planning in Xiamen. The obtained results showed that about 4.24 × 10 6 t of waste would be diverted from landfills when p i is 0.01, which accounted for 93% of waste in Xiamen City, and the waste diversion per unit of cost would be 26.327 × 10 3 t per $10 6 . The capacities of MSW management facilities including incinerators, composting facility, and landfills would be expanded due to increasing waste generation rate.
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
NASA Astrophysics Data System (ADS)
Ladaniuk, Anatolii; Ivashchuk, Viacheslav; Kisała, Piotr; Askarova, Nursanat; Sagymbekova, Azhar
2015-12-01
Conditions of diversification of enterprise products are involving for changes of higher levels of management hierarchy, so it's leading by tasks correcting and changing schedule for operating of production plans. Ordinary solve by combination of enterprise resource are planning and management execution system often has exclusively statistical content. So, the development of decision support system, that helps to use knowledge about subject for capabilities estimating and order of operation of production object is relevant in this time.
Wyoming's industrial siting permit process and environmental impact assessment
NASA Astrophysics Data System (ADS)
Hyman, Eric L.
1982-01-01
The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
U.S. Navy Advanced Receiving: A Better Approach to the Basics.
1987-04-01
the Navy and DLA should begin now to plan for electronic interchange of data between their inventory management systems. This would eliminate the...labor savings from work simplification, improved material handling, and better work load planning 0 Material savings from reduced packaging and use of... planning purposes, source distribution managers use the following equa- tion to determine maximum consolidation time: Maximum consolidation time = 21
NASA Astrophysics Data System (ADS)
Frigerio, Simone; Sterlacchini, Simone; Malet, Jean-Philippe; Glade, Thomas
2010-05-01
PETer (Protection and Emergency of the Territory) has been developed since 2006 as a tool to manage all the information available to perform a wide range of Civil Protection activities. Based on MapObjects spatial support, it was relied on capacity to manage data from different sources and at different scale, offering practical GIS-tools for a technical and practical use during crisis state. At the first stages of the development, after different assessment, critical on-field analysis and a direct proof on test area, the approach came into sight like a valid database management for the entire dataset, but quite static, not full-blown for every emergency necessity, too complicate and not enough user-friendly, considering people in charge during emergency management, the quick change of state with many parameters involved and also uncertainty, hesitation, confusion or general panic among decision makers. As a second step of research, a more down-to-earth methodology targeted to cope with the aftermath of critical events is presented here. It takes advantage of Geographical Information Systems (GIS), Decision Support Systems (DSS), and Information and Communication Technology (ICT) to prepare, apply and coordinate Civil Protection plans. The main aim was to set up and manage contingency plans in advance; that is, to identify and prepare people in charge to take action to define the activities to be performed, to be aware of available resources and to optimize the communication system among the people involved, in order to efficiently face a prospective crisis phase. A disaster preparedness plan should anticipate the demands for a disaster relief operation and indicate the most effective way of joining those requirements. Through scientific and technical co-operation between public and private research groups, a new platform was planned and set up, in order to test the aims of the project. The application was based on a cooperative organizational structure by which information was managed at different levels, linking all people in decision-making roles: crews in the field, the mobile command post and the control room. The tool automatically performs organizational and operational activities within a Civil Protection plan, in line with enforceable regulations. It couples: data processing capabilities by GIS; workflow management modules by DSS and communication systems by the ICT. More specifically, the work presents the overall concept and the system architecture of a generic decision-support system in progress of development, displaying the aims of emergency management and then shows a DSS first of all for Civil Protection Plan within Disaster Preparedness and Response framework in a Consortium of Mountain Municipalities (Valtellina di Tirano, Central Alps, Northern Italy). A multi-area approach (involving the management of disaster scenarios at the La Valette landslide in the Barcelonnette Basin, South French Alps) has been introduced to calibrate the platform, to compare available dataset, information details, laws in force in different countries, stakeholders' responsibility and end-users' background. Work in progress involves multi-task tools useful in emergency situation, to enforce open-communication devices (SMS automatic platform, SKYPE interface, visual video), integrate existing monitoring system and web-service to tailor open-sharing information with emergency management demand.
ERIC Educational Resources Information Center
Meier, Terre; Bundy, Larry
The Management Information System (MIS) of the Washington State system of community colleges was designed to be responsive to legislative and district requests for information and to enhance the State Board's capabilities to manage the community college system and integrate its budgeting and planning processes. The MIS consists of seven…
A Model of Workflow Composition for Emergency Management
NASA Astrophysics Data System (ADS)
Xin, Chen; Bin-ge, Cui; Feng, Zhang; Xue-hui, Xu; Shan-shan, Fu
The common-used workflow technology is not flexible enough in dealing with concurrent emergency situations. The paper proposes a novel model for defining emergency plans, in which workflow segments appear as a constituent part. A formal abstraction, which contains four operations, is defined to compose workflow segments under constraint rule. The software system of the business process resources construction and composition is implemented and integrated into Emergency Plan Management Application System.
Kimura, Joe; DaSilva, Karen; Marshall, Richard
2008-02-01
The increasing prevalence of chronic illnesses in the United States requires a fundamental redesign of the primary care delivery system's structure and processes in order to meet the changing needs and expectations of patients. Population management, systems-based practice, and planned chronic illness care are 3 potential processes that can be integrated into primary care and are compatible with the Chronic Care Model. In 2003, Harvard Vanguard Medical Associates, a multispecialty ambulatory physician group practice based in Boston, Massachusetts, began implementing all 3 processes across its primary care practices. From 2004 to 2006, the overall diabetes composite quality measures improved from 51% to 58% for screening (HgA1c x 2, low-density lipoprotein, blood pressure in 12 months) and from 13% to 17% for intermediate outcomes (HgA1c
Application of JLab 12GeV helium refrigeration system for the FRIB accelerator at MSU
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ganni, Venkatarao; Knudsen, Peter N.; Arenius, Dana M.
The planned approach to have a turnkey helium refrigeration system for the MSU-FRIB accelerator system, encompassing the design, fabrication, installation and commissioning of the 4.5-K refrigerator cold box(es), cold compression system, warm compression system, gas management, oil removal and utility/ancillary systems, was found to be cost prohibitive. Following JLab’s suggestion, MSU-FRIB accelerator management made a formal request to evaluate the applicability of the recently designed 12GeV JLab cryogenic system for this application. The following paper will outline the findings and the planned approach for the FRIB helium refrigeration system.
32 CFR 239.13 - Program Performance Reviews.
Code of Federal Regulations, 2010 CFR
2010-07-01
... will prepare monthly program performance reviews using the Homeowners Assistance Program Management Information System; HQUSACE Annual Management Command Plan and Management Control Checklist. In addition...
Performance planning for rural planning organizations - final report.
DOT National Transportation Integrated Search
2017-02-01
Recent federal rules place increased emphasis on performance-based management of the multimodal : transportation system and require the use of performance based methods in state, metropolitan, and : non-metropolitan transportation planning and progra...
Speed and Delay Prediction Models for Planning Applications
DOT National Transportation Integrated Search
1999-01-01
Estimation of vehicle speed and delay is fundamental to many forms of : transportation planning analyses including air quality, long-range travel : forecasting, major investment studies, and congestion management systems. : However, existing planning...
36 CFR 219.18 - Role of advisory committees.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.18 Role of advisory committees. (a) Advisory committees. Advisory committees can provide an...)). Ecological, Social, and Economic Sustainability ...
Fuzzy robust credibility-constrained programming for environmental management and planning.
Zhang, Yimei; Hang, Guohe
2010-06-01
In this study, a fuzzy robust credibility-constrained programming (FRCCP) is developed and applied to the planning for waste management systems. It incorporates the concepts of credibility-based chance-constrained programming and robust programming within an optimization framework. The developed method can reflect uncertainties presented as possibility-density by fuzzy-membership functions. Fuzzy credibility constraints are transformed to the crisp equivalents with different credibility levels, and ordinary fuzzy inclusion constraints are determined by their robust deterministic constraints by setting a-cut levels. The FRCCP method can provide different system costs under different credibility levels (lambda). From the results of sensitivity analyses, the operation cost of the landfill is a critical parameter. For the management, any factors that would induce cost fluctuation during landfilling operation would deserve serious observation and analysis. By FRCCP, useful solutions can be obtained to provide decision-making support for long-term planning of solid waste management systems. It could be further enhanced through incorporating methods of inexact analysis into its framework. It can also be applied to other environmental management problems.
76 FR 4721 - Notice of the Joint Colorado Resource Advisory Council Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
... Conservation System, recreation, land-use planning, fire, energy and minerals management, travel management, wilderness, wild horse herd management, land exchange proposals, and cultural resource management. These...
Hydrogeology of glacial-terrain lakes, with management and planning applications
Born, S.M.; Smith, S.A.; Stephenson, D.A.
1979-01-01
The subject of the relationship between groundwater and lakes is characterized by sparse information and, in general, has received limited attention by hydrologists. Nevertheless, the hydrogeologic regime of lakes must be adequately assessed in order to intelligently manage lakes and their related shorelands. This paper is a compilation of hydrogeologic data for numerous lakes in North America and presents a preliminary classification framework for lakes based on hydrogeologic considerations. The classification leads to systematic categorization of lake types for planning and management purposes. The main hydrogeologic factors for assessing lake environments are: (1) regime dominance, the relative magnitude of groundwater in the total water budget of a lake; (2) system efficiency, a description of the rate aspects of surface and groundwater movement through a lake system; and (3) position within a groundwater flow system. We indicate the significance and difficulty of measuring these descriptive characteristics and provide examples of each category. Additionally, a variety of lake-related activities that illustrate the value of hydrogeologic information for planning and management purposes are presented. ?? 1979.
Lonsdale, Jemma; Nicholson, Rose; Weston, Keith; Elliott, Michael; Birchenough, Andrew; Sühring, Roxana
2018-02-01
Estuaries are amongst the most socio-economically and ecologically important environments however, due to competing and conflicting demands, management is often challenging with a complex legislative framework managed by multiple agencies. To facilitate the understanding of this legislative framework, we have developed a GISbased Estuarine Planning Support System tool. The tool integrates the requirements of the relevant legislation and provides a basis for assessing the current environmental state of an estuary as well as informing and assessing new plans to ensure a healthy estuarine state. The tool ensures that the information is easily accessible for regulators, managers, developers and the public. The tool is intended to be adaptable, but is assessed using the Humber Estuary, United Kingdom as a case study area. The successful application of the tool for complex socio-economic and environmental systems demonstrates that the tool can efficiently guide users through the complex requirements needed to support sustainable development. Crown Copyright © 2017. Published by Elsevier Ltd. All rights reserved.
The Mission Operations Planning Assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
The mission operations planning assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
Washington State Community College Capital Master Plan, 1985-91. Management Summary.
ERIC Educational Resources Information Center
Washington State Board for Community Coll. Education, Olympia.
Designed for Washington State's decision makers and the trustees and administrators of the community college system, this report extracts information from the community college system's 1985-87 capital budget request and 1985-91 capital master plan to provide a brief description of the budget and plan. Introductory material discusses the…
Guideline for the Comprehensive Campus Master Plan System.
ERIC Educational Resources Information Center
State Univ. System of Florida, Tallahassee.
This document is a guideline for institutions in the Florida State University System to use as they comply with state mandates requiring them to develop campus master plans and land management plans. It supplements the minimum criteria in the state's Administrative Code. For each element the guide offers description of its purpose, data…
DOT National Transportation Integrated Search
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
DOT National Transportation Integrated Search
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
Critical Mass: Education and the Economy.
ERIC Educational Resources Information Center
Groff, Warren H.
1984-01-01
Underscores the importance of strategic planning and management in higher education in the future, emphasizing the need to develop the intellectual capital necessary to implement planning and management systems to tighten the relationship between education and the economy. Discusses selected facts about the economy and the challenges facing…
Management Planning and Control: Supporting Knowledge-Intensive Organizations
ERIC Educational Resources Information Center
Herremans, Irene M.; Isaac, Robert G.
2005-01-01
Purpose: The purpose of this paper is to develop propositions for empirical validation regarding appropriate management planning and control systems (MPACS) in knowledge-intensive organizations. Design/methodology/approach: The propositions were developed from interviews with members of a knowledge-intensive virtual organization that is known for…
DOT National Transportation Integrated Search
2010-12-01
The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the operation of freeways, arterials, and public transit. The system will be shared between information system...
Geographic Information Systems and Web Page Development
NASA Technical Reports Server (NTRS)
Reynolds, Justin
2004-01-01
The Facilities Engineering and Architectural Branch is responsible for the design and maintenance of buildings, laboratories, and civil structures. In order to improve efficiency and quality, the FEAB has dedicated itself to establishing a data infrastructure based on Geographic Information Systems, GIS. The value of GIS was explained in an article dating back to 1980 entitled "Need for a Multipurpose Cadastre" which stated, "There is a critical need for a better land-information system in the United States to improve land-conveyance procedures, furnish a basis for equitable taxation, and provide much-needed information for resource management and environmental planning." Scientists and engineers both point to GIS as the solution. What is GIS? According to most text books, Geographic Information Systems is a class of software that stores, manages, and analyzes mapable features on, above, or below the surface of the earth. GIS software is basically database management software to the management of spatial data and information. Simply put, Geographic Information Systems manage, analyze, chart, graph, and map spatial information. GIS can be broken down into two main categories, urban GIS and natural resource GIS. Further still, natural resource GIS can be broken down into six sub-categories, agriculture, forestry, wildlife, catchment management, archaeology, and geology/mining. Agriculture GIS has several applications, such as agricultural capability analysis, land conservation, market analysis, or whole farming planning. Forestry GIs can be used for timber assessment and management, harvest scheduling and planning, environmental impact assessment, and pest management. GIS when used in wildlife applications enables the user to assess and manage habitats, identify and track endangered and rare species, and monitor impact assessment.
Computerized physician order entry from a chief information officer perspective.
Cotter, Carole M
2004-12-01
Designing and implementing a computerized physician order entry system in the critical care units of a large urban hospital system is an enormous undertaking. With their significant potential to improve health care and significantly reduce errors, the time for computerized physician order entry or physician order management systems is past due. Careful integrated planning is the key to success, requiring multidisciplinary teams at all levels of clinical and administrative management to work together. Articulated from the viewpoint of the Chief Information Officer of Lifespan, a not-for-profit hospital system in Rhode Island, the vision and strategy preceding the information technology plan, understanding the system's current state, the gap analysis between current and future state, and finally, building and implementing the information technology plan are described.
Safer Systems: A NextGen Aviation Safety Strategic Goal
NASA Technical Reports Server (NTRS)
Darr, Stephen T.; Ricks, Wendell R.; Lemos, Katherine A.
2008-01-01
The Joint Planning and Development Office (JPDO), is charged by Congress with developing the concepts and plans for the Next Generation Air Transportation System (NextGen). The National Aviation Safety Strategic Plan (NASSP), developed by the Safety Working Group of the JPDO, focuses on establishing the goals, objectives, and strategies needed to realize the safety objectives of the NextGen Integrated Plan. The three goal areas of the NASSP are Safer Practices, Safer Systems, and Safer Worldwide. Safer Practices emphasizes an integrated, systematic approach to safety risk management through implementation of formalized Safety Management Systems (SMS) that incorporate safety data analysis processes, and the enhancement of methods for ensuring safety is an inherent characteristic of NextGen. Safer Systems emphasizes implementation of safety-enhancing technologies, which will improve safety for human-centered interfaces and enhance the safety of airborne and ground-based systems. Safer Worldwide encourages coordinating the adoption of the safer practices and safer systems technologies, policies and procedures worldwide, such that the maximum level of safety is achieved across air transportation system boundaries. This paper introduces the NASSP and its development, and focuses on the Safer Systems elements of the NASSP, which incorporates three objectives for NextGen systems: 1) provide risk reducing system interfaces, 2) provide safety enhancements for airborne systems, and 3) provide safety enhancements for ground-based systems. The goal of this paper is to expose avionics and air traffic management system developers to NASSP objectives and Safer Systems strategies.
75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...
Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter
2009-11-01
This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.
48 CFR 1511.011-79 - Information resources management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2014 CFR
2014-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2012 CFR
2012-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2013 CFR
2013-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2011 CFR
2011-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
45 CFR 1304.51 - Management systems and procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... control program quality, maintain program accountability, and advise governing bodies, policy groups, and... DELEGATE AGENCIES Program Design and Management § 1304.51 Management systems and procedures. (a) Program... program planning that includes consultation with the program's governing body, policy groups, and program...
48 CFR 1511.011-79 - Information resources management.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...
48 CFR 1511.011-79 - Information resources management.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...
48 CFR 1511.011-79 - Information resources management.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...
48 CFR 1511.011-79 - Information resources management.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Information resources management. 1511.011-79 Section 1511.011-79 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING DESCRIBING AGENCY NEEDS 1511.011-79 Information resources management. The...
Global positioning systems for personal travel surveys : Lexington area travel data collection test
DOT National Transportation Integrated Search
1986-12-01
The urban transportation planning process is undergoing critical transformations. Of particular interest is the emergence of private sector involvement in the planning, management, financing, construction of transportation systems and provision of tr...
BMP analysis system for watershed-based stormwater management.
Zhen, Jenny; Shoemaker, Leslie; Riverson, John; Alvi, Khalid; Cheng, Mow-Soung
2006-01-01
Best Management Practices (BMPs) are measures for mitigating nonpoint source (NPS) pollution caused mainly by stormwater runoff. Established urban and newly developing areas must develop cost effective means for restoring or minimizing impacts, and planning future growth. Prince George's County in Maryland, USA, a fast-growing region in the Washington, DC metropolitan area, has developed a number of tools to support analysis and decision making for stormwater management planning and design at the watershed level. These tools support watershed analysis, innovative BMPs, and optimization. Application of these tools can help achieve environmental goals and lead to significant cost savings. This project includes software development that utilizes GIS information and technology, integrates BMP processes simulation models, and applies system optimization techniques for BMP planning and selection. The system employs the ESRI ArcGIS as the platform, and provides GIS-based visualization and support for developing networks including sequences of land uses, BMPs, and stream reaches. The system also provides interfaces for BMP placement, BMP attribute data input, and decision optimization management. The system includes a stand-alone BMP simulation and evaluation module, which complements both research and regulatory nonpoint source control assessment efforts, and allows flexibility in the examining various BMP design alternatives. Process based simulation of BMPs provides a technique that is sensitive to local climate and rainfall patterns. The system incorporates a meta-heuristic optimization technique to find the most cost-effective BMP placement and implementation plan given a control target, or a fixed cost. A case study is presented to demonstrate the application of the Prince George's County system. The case study involves a highly urbanized area in the Anacostia River (a tributary to Potomac River) watershed southeast of Washington, DC. An innovative system of management practices is proposed to minimize runoff, improve water quality, and provide water reuse opportunities. Proposed management techniques include bioretention, green roof, and rooftop runoff collection (rain barrel) systems. The modeling system was used to identify the most cost-effective combinations of management practices to help minimize frequency and size of runoff events and resulting combined sewer overflows to the Anacostia River.
Water resources planning based on complex system dynamics: A case study of Tianjin city
NASA Astrophysics Data System (ADS)
Zhang, X. H.; Zhang, H. W.; Chen, B.; Chen, G. Q.; Zhao, X. H.
2008-12-01
A complex system dynamic (SD) model focusing on water resources, termed as TianjinSD, is developed for the integrated and scientific management of the water resources of Tianjin, which contains information feedback that governs interactions in the system and is capable of synthesizing component-level knowledge into system behavior simulation at an integrated level, thus presenting reasonable predictive results for policy-making on water resources allocation and management. As for the Tianjin city, interactions among 96 components for 12 years are explored and four planning alternatives are chosen, one of which is based on the conventional mode assuming that the existing pattern of human activities will be prevailed, while the others are alternative planning designs based on the interaction of local authorities and planning researchers. Optimal mode is therefore obtained according to different scenarios when compared the simulation results for evaluation of different decisions and dynamic consequences.
Learning from conservation planning for the U.S. National Wildlife Refuges.
Meretsky, Vicky J; Fischman, Robert L
2014-10-01
The U.S. National Wildlife Refuge System has nearly completed its first round of unit-level, comprehensive conservation plans (CCPs) and will soon begin required revisions. Laws and policies governing refuge planning emphasize ecological integrity, landscape-scale conservation, and adaptive management. We evaluated 185 CCPs completed during 2005-2011, which cover 324 of 555 national wildlife refuges. We reviewed CCP prescriptions addressing 5 common conservation issues (habitat and game, nongame, imperiled, and invasive species) and 3 specialized topics (landscape-scale conservation, climate change, and environmental quality). Common conservation issues received prescriptions in >90% of CCPs. Specialized topics received more variable treatment. Prescriptions for aquatic connectivity, water quantity, and climate-change impacts increased over the study period. Except for climate change, direct actions were the most common type of management prescription, followed by plans or studies. Most CCPs stated a commitment to adaptive management and prescribed monitoring for common conservation objectives; other aspects of planning for adaptive management were often lacking, despite strong support for adaptive management in the conservation planning literature. To better address refuge-specific threats, we recommend that revised plans explicitly match identified refuge issues with prescriptions, particularly for under-represented concerns such as novel pests and pathogens. We recommend incorporating triggers into monitoring frameworks and specifying actions that will occur when threshold values are reached to improve support for adaptive management. Revised CCPs should better reflect work that refuges already undertake to extend conservation objectives beyond their borders and better engage with regional conservation efforts to continue this work. More thorough landscape-scale threat assessments and explicit prioritization of planned actions would further improve conservation effectiveness. Excellent examples of all recommended practices exist within the CCPs we examined; sharing best planning practices would improve planning efficiency within the refuge system. © 2014 The Authors. Conservation Biology published by Wiley Periodicals, Inc., on behalf of the Society for Conservation Biology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hannan, M.A., E-mail: hannan@eng.ukm.my; Abdulla Al Mamun, Md., E-mail: md.abdulla@siswa.ukm.edu.my; Hussain, Aini, E-mail: aini@eng.ukm.my
Highlights: • Classification of available technologies for SWM system in four core category. • Organization of technology based SWM systems in three main groups. • Summary of SWM systems with target application, methodology and functional domain. • Issues and challenges are highlighted for further design of a sustainable system. - Abstract: In the backdrop of prompt advancement, information and communication technology (ICT) has become an inevitable part to plan and design of modern solid waste management (SWM) systems. This study presents a critical review of the existing ICTs and their usage in SWM systems to unfold the issues and challengesmore » towards using integrated technologies based system. To plan, monitor, collect and manage solid waste, the ICTs are divided into four categories such as spatial technologies, identification technologies, data acquisition technologies and data communication technologies. The ICT based SWM systems classified in this paper are based on the first three technologies while the forth one is employed by almost every systems. This review may guide the reader about the basics of available ICTs and their application in SWM to facilitate the search for planning and design of a sustainable new system.« less
[Infrastructure and contents of clinical data management plan].
Shen, Tong; Xu, Lie-dong; Fu, Hai-jun; Liu, Yan; He, Jia; Chen, Ping-yan; Song, Yu-fei
2015-11-01
Establishment of quality management system (QMS) plays a critical role in the clinical data management (CDM). The objectives of CDM are to ensure the quality and integrity of the trial data. Thus, every stage or element that may impact the quality outcomes of clinical studies should be in the controlled manner, which is referred to the full life cycle of CDM associated with the data collection, handling and statistical analysis of trial data. Based on the QMS, this paper provides consensus on how to develop a compliant clinical data management plan (CDMP). According to the essential requirements of the CDM, the CDMP should encompass each process of data collection, data capture and cleaning, medical coding, data verification and reconciliation, database monitoring and management, external data transmission and integration, data documentation and data quality assurance and so on. Creating and following up data management plan in each designed data management steps, dynamically record systems used, actions taken, parties involved will build and confirm regulated data management processes, standard operational procedures and effective quality metrics in all data management activities. CDMP is one of most important data management documents that is the solid foundation for clinical data quality.
MDOT Pavement Management System : Prediction Models and Feedback System
DOT National Transportation Integrated Search
2000-10-01
As a primary component of a Pavement Management System (PMS), prediction models are crucial for one or more of the following analyses: : maintenance planning, budgeting, life-cycle analysis, multi-year optimization of maintenance works program, and a...
Pavement management system for City of Madison : research brief.
DOT National Transportation Integrated Search
2016-11-01
In this study, a complete pavement management system (PMS) was created and implemented in : Madison, SD. The system consists of a street geodatabase, development of pavement performance : models and maintenance & rehabilitation (M&R) plans. The PMS d...
ERIC Educational Resources Information Center
Gubasta, Joseph L.
This paper outlines several considerations relating to the preparation of information systems for educational managers. College and university managers must have clearly stated needs for planning and management information and the potential uses to which such information could be put. Information systems should be created to satisfy operational…
Symstad, Amy J.; Fisichelli, Nicholas A.; Miller, Brian W.; Rowland, Erika; Schuurman, Gregor W.
2017-01-01
Scenario planning helps managers incorporate climate change into their natural resource decision making through a structured “what-if” process of identifying key uncertainties and potential impacts and responses. Although qualitative scenarios, in which ecosystem responses to climate change are derived via expert opinion, often suffice for managers to begin addressing climate change in their planning, this approach may face limits in resolving the responses of complex systems to altered climate conditions. In addition, this approach may fall short of the scientific credibility managers often require to take actions that differ from current practice. Quantitative simulation modeling of ecosystem response to climate conditions and management actions can provide this credibility, but its utility is limited unless the modeling addresses the most impactful and management-relevant uncertainties and incorporates realistic management actions. We use a case study to compare and contrast management implications derived from qualitative scenario narratives and from scenarios supported by quantitative simulations. We then describe an analytical framework that refines the case study’s integrated approach in order to improve applicability of results to management decisions. The case study illustrates the value of an integrated approach for identifying counterintuitive system dynamics, refining understanding of complex relationships, clarifying the magnitude and timing of changes, identifying and checking the validity of assumptions about resource responses to climate, and refining management directions. Our proposed analytical framework retains qualitative scenario planning as a core element because its participatory approach builds understanding for both managers and scientists, lays the groundwork to focus quantitative simulations on key system dynamics, and clarifies the challenges that subsequent decision making must address.
Information System Development: Phase I, Management Planning.
ERIC Educational Resources Information Center
Woods, Bill M.
Objectives of this study of the operations of Engineering Index were to: (1) determine the need for a planning capability, (2) blueprint a mechanism to accomplish planning, and (3) recommend priorities requiring planning attention. Topics considered in the study are planning, the role of the board of directors and trustees, organizational…
36 CFR 219.3 - Role of science in planning.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Role of science in planning. 219.3 Section 219.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.3 Role of science in planning. The...
36 CFR 219.3 - Role of science in planning.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Role of science in planning. 219.3 Section 219.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.3 Role of science in planning. The...
36 CFR 219.3 - Role of science in planning.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Role of science in planning. 219.3 Section 219.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.3 Role of science in planning. The...
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
Multi-community command and control systems in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.
1976-01-01
A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, K.; Tsai, H.; Decision and Information Sciences
The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it canmore » be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.« less
NASA Astrophysics Data System (ADS)
1980-09-01
The energy emergency management information system (EEMIS) has responsibility for providing special information and communication services to government officials at Federal and state levels, who must deal with energy emergencies. Because of proprietary information residing in the data base used for federal purposes, a special system (EEMIS-S) must be established for use by the states. It is planned to acquire teleprocessing services for EEMIS-S from a time-sharing commercial vendor, and the process for procurement must meet guidelines for approval. The work plan and schedule for meeting these guidelines are discussed. Tasks to be included contain estimates of time, cost, and resources required, all of which are briefly described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama
2007-07-01
NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunt, Farren
2013-12-01
Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in themore » past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.« less
Information for Institutional Renewal.
ERIC Educational Resources Information Center
Spencer, Richard L.
1979-01-01
Discusses a planning, management, and evaluation system, an objective-based planning process, research databases, analytical reports, and transactional data as state-of-the-art tools available to generate data which link research directly to planning for institutional renewal. (RC)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... Islands, et al.; Monument Management Plan, Comprehensive Conservation Plans, and Environmental Assessment... the National Atmospheric and Oceanic Administration (NOAA), intend to prepare the monument management... the National Wildlife Refuge System (NWRS) contained therein. When the draft MMP is complete, we will...
ERIC Educational Resources Information Center
Himes, Dottie
This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…
Financial Management for Transit: A Handbook.
ERIC Educational Resources Information Center
Heaselden, Mark; And Others
This handbook is primarily intended to serve as a primer for transit system managers who have not had any formal financial education through college classes, professional development programs, or extensive on-the-job programs. The following topics are covered: financial planning techniques for transit (beginning the financial planning process,…
36 CFR 223.30 - Consistency with plans, environmental standards, and other management requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.30 Section 223.30 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER...
Linear Programming for Vocational Education Planning. Interim Report.
ERIC Educational Resources Information Center
Young, Robert C.; And Others
The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…
Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
40 CFR 264.1035 - Recordkeeping requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... management units in one recordkeeping system if the system identifies each record by each hazardous waste management unit. (b) Owners and operators must record the following information in the facility operating...., identify the hazardous waste management units on a facility plot plan). (ii) Information and data...
Children/Youth Physical Fitness Program Management System.
ERIC Educational Resources Information Center
Mozzini, Lou; And Others
Intended for physical fitness program managers, this book presents a system through which these professionals can justify, evaluate, develop, supervise, and promote a sound physical fitness program. Sections address the management stages of: (1) program assessment; (2) program commitment; (3) physical fitness program planning; (4) program…
An inexact reverse logistics model for municipal solid waste management systems.
Zhang, Yi Mei; Huang, Guo He; He, Li
2011-03-01
This paper proposed an inexact reverse logistics model for municipal solid waste management systems (IRWM). Waste managers, suppliers, industries and distributors were involved in strategic planning and operational execution through reverse logistics management. All the parameters were assumed to be intervals to quantify the uncertainties in the optimization process and solutions in IRWM. To solve this model, a piecewise interval programming was developed to deal with Min-Min functions in both objectives and constraints. The application of the model was illustrated through a classical municipal solid waste management case. With different cost parameters for landfill and the WTE, two scenarios were analyzed. The IRWM could reflect the dynamic and uncertain characteristics of MSW management systems, and could facilitate the generation of desired management plans. The model could be further advanced through incorporating methods of stochastic or fuzzy parameters into its framework. Design of multi-waste, multi-echelon, multi-uncertainty reverse logistics model for waste management network would also be preferred. Copyright © 2010 Elsevier Ltd. All rights reserved.
Common occupational classification system - revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stahlman, E.J.; Lewis, R.E.
1996-05-01
Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less
Daniel Navon
1978-01-01
These 14 papers were submitted to a conference of Project Group P4.07 Division IV, International Union of Forestry Research Organizations. Topics discussed included the uses of simulations, analytical techniques, and mathematical programming techniques in land management planning, reforestation programs, intensive forestry, timber management and production, tree growth...
76 FR 14375 - United States Integrated Ocean Observing System Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... coastal resources; and public safety. The System is also designed to promote research to develop, test...; coastal management; fisheries management; coastal and marine spatial planning; geodesy; water levels; and...
1990-10-01
International Defense Cooperation Agreements; Quality Force Deployment; How Contractors See Systems Acquisition; DOD Metric Transition Plans and Actions; Proposals for Innovation In Service Quality . (sdw)
Still Not Enough Time in the Day: Media Specialists, Program Planning and Time Management, Part II
ERIC Educational Resources Information Center
Fitzgerald, Mary Ann; Waldrip, Andrea
2004-01-01
The ways in which one can keep the library media plan on track in the face of the realistic challenges faced by media are discussed. A system for prioritizing tasks, both planned goal-related tasks and tasks that walk in the door in varying degrees of emergency status and by need of more time management strategies could be used. [For Part I, see…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
Blazing the trailway: Nuclear electric propulsion and its technology program plans
NASA Technical Reports Server (NTRS)
Doherty, Michael P.
1992-01-01
An overview is given of the plans for a program in nuclear electric propulsion (NEP) technology for space applications being considered by NASA, DOE, and DOD. Possible missions using NEP are examined, and NEP technology plans are addressed regarding concept development, systems engineering, nuclear fuels, power conversion, thermal management, power management and distribution, electric thrusters, facilities, and issues related to safety and environment. The programmatic characteristics are considered.
Automated planning for intelligent machines in energy-related applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; de Saussure, G.; Barhen, J.
1984-01-01
This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.
An Advanced Microcosting System for Forecasting and Managing Radiology Expenses
Arenson, Ronald; Viale, Richard; van der Voorde, Frans
1985-01-01
The new prospective payment system encourages hospital cost containment and necessitates understanding actual costs for radiology procedures. The automated microcosting system described here, utilizing data from the Radiology Information Management System, hospital expense reports, and payroll management reports, calculates an accurate unit cost for each procedure type. This data is very useful for cost control, enhancement of department efficiency, and planning.
The Internet and managed care: a new wave of innovation.
Goldsmith, J
2000-01-01
Managed care firms have been under siege in the political system and the marketplace for the past few years. The rise of the Internet has brought into being powerful new electronic tools for automating administrative and financial processes in health insurance. These tools may enable new firms or employers to create custom-designed networks connecting their workers and providers, bypassing health plans altogether. Alternatively, health plans may use these tools to create a new consumer-focused business model. While some disintermediation of managed care plans may occur, the barriers to adoption of Internet tools by established plans are quite low. Network computing may provide important leverage for health plans not only to retain their franchises but also to improve their profitability and customer service.
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...
78 FR 51169 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-20
... DoD applications: Defense Enterprise Accounting Management System (DEAMS), General Fund Enterprise... Enterprise Resource Planning (NAVY ERP), Enterprise Business System (EBS). Once all data files have been... submitting comments. Mail: Federal Docket Management System Office, 4800 Mark Center Drive, East Tower, Suite...