Engineering Safety- and Security-Related Requirements for Software-Intensive Systems
2010-04-27
Requirements Negative (shall not) Requirements Hardware Requirements equ remen s System / Documentation Requirements eve oper Requirements Operational ...Validation Actual / Proposed Defensibility C li Operational Vulnerability Analysis VulnerabilityVulnerability Safety Vulnerability performs System ...including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
A Study on the Deriving Requirements of ARGO Operation System
NASA Astrophysics Data System (ADS)
Seo, Yoon-Kyung; Rew, Dong-Young; Lim, Hyung-Chul; Park, In-Kwan; Yim, Hong-Suh; Jo, Jung Hyun; Park, Jong-Uk
2009-12-01
Korea Astronomy and Space Science Institute (KASI) has been developing one mobile and one stationary SLR system since 2008 named as ARGO-M and ARGO-F, respectively. KASI finished the step of deriving the system requirements of ARGO. The requirements include definitions and scopes of various software and hardware components which are necessary for developing the ARGO-M operation system. And the requirements define function, performance, and interface requirements. The operation system consisting of ARGO-M site, ARGO-F site, and Remote Operation Center (ROC) inside KASI is designed for remote access and the automatic tracking and control system which are the main operation concept of ARGO system. To accomplish remote operation, we are considering remote access to ARGO-F and ARGO-M from ROC. The mobile-phone service allows us to access the ARGO-F remotely and to control the system in an emergency. To implement fully automatic tracking and control function in ARGO-F, we have investigated and described the requirements about the automatic aircraft detection system and the various meteorological sensors. This paper addresses the requirements of ARGO Operation System.
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
Code of Federal Regulations, 2010 CFR
2010-04-01
... laboratory operations associated with the production and process control system? 111.110 Section 111.110 Food... OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control System: Requirements for Quality Control... production and process control system? Quality control operations for laboratory operations associated with...
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Operations Center (SOC) orbital space station research missions integration, crew requirements, SOC operations, and configurations are analyzed. Potential research and applications missions and their requirements are described. The capabilities of SOC are compared with user requirements. The SOC/space shuttle and shuttle-derived vehicle flight support operations and SOC orbital operations are described. Module configurations and systems options, SOC/external tank configurations, and configurations for geostationary orbits are described. Crew and systems safety configurations are summarized.
46 CFR 151.40-10 - Operational requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... shall operate when either the pressure or the temperature exceeds the operating limits of the system... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES BARGES... Operational requirements. Control systems, required by Table 151.05 shall be provided with an audible or...
NASA Technical Reports Server (NTRS)
Benson, H.; Jenkins, L. M.
1981-01-01
The construction, operation, and maintenance requirements for a solar power satellite, including the space and ground systems, are reviewed. The basic construction guidelines are explained, and construction location options are discussed. The space construction tasks, equipment, and base configurations are discussed together with the operations required to place a solar power satellite in geosynchronous orbit. A rectenna construction technique is explained, and operation with the grid is defined. Maintenance requirements are summarized for the entire system. Key technology issues required for solar power satellite construction operations are defined.
NASA Technical Reports Server (NTRS)
Jung, Jaewoo; D'Souza, Sarah N.; Johnson, Marcus A.; Ishihara, Abraham K.; Modi, Hemil C.; Nikaido, Ben; Hasseeb, Hashmatullah
2016-01-01
In anticipation of a rapid increase in the number of civil Unmanned Aircraft System(UAS) operations, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that will investigate airspace integration requirements for enabling safe, efficient low-altitude operations. One aspect a UTM system must consider is the correlation between UAS operations (such as vehicles, operation areas and durations), UAS performance requirements, and the risk to people and property in the operational area. This paper investigates the potential application of the International Civil Aviation Organizations (ICAO) Required Navigation Performance (RNP) concept to relate operational risk with trajectory conformance requirements. The approach is to first define a method to quantify operational risk and then define the RNP level requirement as a function of the operational risk. Greater operational risk corresponds to more accurate RNP level, or smaller tolerable Total System Error (TSE). Data from 19 small UAS flights are used to develop and validate a formula that defines this relationship. An approach to assessing UAS-RNP conformance capability using vehicle modeling and wind field simulation is developed to investigate how this formula may be applied in a future UTM system. The results indicate the modeled vehicles flight path is robust to the simulated wind variation, and it can meet RNP level requirements calculated by the formula. The results also indicate how vehicle-modeling fidelity may be improved to adequately verify assessed RNP level.
Study of solid rocket motor for space shuttle booster, volume 2, book 3, appendix A
NASA Technical Reports Server (NTRS)
1972-01-01
A systems requirements analysis for the solid propellant rocket engine to be used with the space shuttle was conducted. The systems analysis was developed to define the physical and functional requirements for the systems and subsystems. The operations analysis was performed to identify the requirements of the various launch operations, mission operations, ground operations, and logistic and flight support concepts.
Code of Federal Regulations, 2010 CFR
2010-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring... additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values and applicable performance specifications...
Code of Federal Regulations, 2011 CFR
2011-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring... additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values and applicable performance specifications...
Analysis of remote operating systems for space-based servicing operations, volume 1
NASA Technical Reports Server (NTRS)
1985-01-01
A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.
Expert system verification concerns in an operations environment
NASA Technical Reports Server (NTRS)
Goodwin, Mary Ann; Robertson, Charles C.
1987-01-01
The Space Shuttle community is currently developing a number of knowledge-based tools, primarily expert systems, to support Space Shuttle operations. It is proposed that anticipating and responding to the requirements of the operations environment will contribute to a rapid and smooth transition of expert systems from development to operations, and that the requirements for verification are critical to this transition. The paper identifies the requirements of expert systems to be used for flight planning and support and compares them to those of existing procedural software used for flight planning and support. It then explores software engineering concepts and methodology that can be used to satisfy these requirements, to aid the transition from development to operations and to support the operations environment during the lifetime of expert systems. Many of these are similar to those used for procedural hardware.
14 CFR 121.127 - Flight following system; requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Flight following system; requirements. 121... Supplemental Operations § 121.127 Flight following system; requirements. (a) Each certificate holder conducting supplemental operations using a flight following system must show that— (1) The system has adequate facilities...
14 CFR 121.127 - Flight following system; requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Flight following system; requirements. 121... Supplemental Operations § 121.127 Flight following system; requirements. (a) Each certificate holder conducting supplemental operations using a flight following system must show that— (1) The system has adequate facilities...
14 CFR 121.127 - Flight following system; requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Flight following system; requirements. 121... Supplemental Operations § 121.127 Flight following system; requirements. (a) Each certificate holder conducting supplemental operations using a flight following system must show that— (1) The system has adequate facilities...
14 CFR 121.127 - Flight following system; requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Flight following system; requirements. 121... Supplemental Operations § 121.127 Flight following system; requirements. (a) Each certificate holder conducting supplemental operations using a flight following system must show that— (1) The system has adequate facilities...
14 CFR 121.127 - Flight following system; requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Flight following system; requirements. 121... Supplemental Operations § 121.127 Flight following system; requirements. (a) Each certificate holder conducting supplemental operations using a flight following system must show that— (1) The system has adequate facilities...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
32 CFR 505.8 - Training requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... managers, computer systems development personnel, computer systems operations personnel, statisticians... Act requires all heads of Army Staff agencies, field operating agencies, direct reporting units, Major... in the design, development, operation, and maintenance of any Privacy Act system of records and to...
32 CFR 505.8 - Training requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... managers, computer systems development personnel, computer systems operations personnel, statisticians... Act requires all heads of Army Staff agencies, field operating agencies, direct reporting units, Major... in the design, development, operation, and maintenance of any Privacy Act system of records and to...
32 CFR 505.8 - Training requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... managers, computer systems development personnel, computer systems operations personnel, statisticians... Act requires all heads of Army Staff agencies, field operating agencies, direct reporting units, Major... in the design, development, operation, and maintenance of any Privacy Act system of records and to...
32 CFR 505.8 - Training requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... managers, computer systems development personnel, computer systems operations personnel, statisticians... Act requires all heads of Army Staff agencies, field operating agencies, direct reporting units, Major... in the design, development, operation, and maintenance of any Privacy Act system of records and to...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
Management of Operational Support Requirements for Manned Flight Missions
NASA Technical Reports Server (NTRS)
1991-01-01
This Instruction establishes responsibilities for managing the system whereby operational support requirements are levied for support of manned flight missions including associated payloads. This management system will ensure that support requirements are properly requested and responses are properly obtained to meet operational objectives.
DOT National Transportation Integrated Search
1997-01-13
Management Advisory Memorandum on Resource Requirement Planning for Operating and Maintaining the National Airspace System (NAS) in the Federal Aviation Administration (FAA). Evaluates FAA's resource requirement planning system to ensure it accuratel...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2012 CFR
2012-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2014 CFR
2014-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2013 CFR
2013-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2010 CFR
2010-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
Applying Early Systems Engineering: Injecting Knowledge into the Capability Development Process
2012-10-01
involves early use of systems engi- neering and technical analyses to supplement the existing operational analysis techniques currently used in...complexity, and costs of systems now being developed require tight coupling between operational requirements stated in the CDD, system requirements...Fleischer » Keywords: Capability Development, Competitive Prototyping, Knowledge Points, Early Systems Engineering Applying Early Systems
HALE UAS Concept of Operations. Version 3.0
NASA Technical Reports Server (NTRS)
2006-01-01
This document is a system level Concept of Operations (CONOPS) from the perspective of future High Altitude Long Endurance (HALE) Unmanned Aircraft Systems (UAS) service providers and National Airspace System (NAS) users. It describes current systems (existing UAS), describes HALE UAS functions and operations to be performed (via sample missions), and offers insight into the user s environment (i.e., the UAS as a system of systems). It is intended to be a source document for NAS UAS operational requirements, and provides a construct for government agencies to use in guiding their regulatory decisions, architecture requirements, and investment strategies. Although it does not describe the technical capabilities of a specific HALE UAS system (which do, and will vary widely), it is intended to aid in requirements capture and to be used as input to the functional requirements and analysis process. The document provides a basis for development of functional requirements and operational guidelines to achieve unrestricted access into the NAS. This document is an FY06 update to the FY05 Access 5 Project-approved Concept of Operations document previously published in the Public Domain on the Access 5 open website. This version is recommended to be approved for public release also. The updates are a reorganization of materials from the previous version with the addition of an updated set of operational requirements, inclusion of sample mission scenarios, and identification of roles and responsibilities of interfaces within flight phases.
Improved Orbiter Waste Collection System Study, Appendix D
NASA Technical Reports Server (NTRS)
1984-01-01
Basic requirements for a space shuttle orbiter waste collection system are established. They are intended to be an aid in the development and procurement of a representative flight test article. Orbiter interface requirements, performance requirements, flight crew operational requirements, flight environmental requirements, and ground operational and environmental requirements are considered.
48 CFR 970.4402-2 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402-2 General requirements. The following shall apply to the purchasing systems of management and operating contractors: (a) The objective of a management and operating contractor's purchasing system is to...
Space-based solar power conversion and delivery systems (study), engineering analysis
NASA Technical Reports Server (NTRS)
Nathan, C. A.
1975-01-01
A systems analysis of synchronous, orbit-based power generation and relay systems that could be operational in the 1990's is described along with a comparison with earth-based systems to be operational in the same time frame. Operational and economic requirements for the orbiting systems and near term research activities which will be required to assure feasibility, development, launch and operational capabilities of such systems in the post- 1990 time frame are examined.
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... management units in one recordkeeping system if the system identifies each record by each hazardous waste management unit. (b) Owners and operators must record the following information in the facility operating... monitoring, operating, and inspection information for each closed-vent system and control device required to...
DOT National Transportation Integrated Search
1993-10-01
This document describes the Concept of Operations and Generic System Requirements for : the next generation of Traffic Management Centers (TMC). Four major steps comprise the : development of this Concept of Operations. The first step was to survey t...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2014 CFR
2014-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2013 CFR
2013-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2010 CFR
2010-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2014 CFR
2014-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2011 CFR
2011-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2012 CFR
2012-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2013 CFR
2013-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2012 CFR
2012-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2011 CFR
2011-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
47 CFR 15.113 - Power line carrier systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subject only to the following requirements: (a) A power utility operating a power line carrier system... systems to an industry-operated entity as set forth in § 90.63(g) of this chapter. No notification to the FCC is required. (b) The operating parameters of a power line carrier system (particularly the...
Automated Ground Umbilical Systems (AGUS) Project
NASA Technical Reports Server (NTRS)
Gosselin, Armand M.
2007-01-01
All space vehicles require ground umbilical systems for servicing. Servicing requirements can include, but are not limited to, electrical power and control, propellant loading and venting, pneumatic system supply, hazard gas detection and purging as well as systems checkout capabilities. Of the various types of umbilicals, all require several common subsystems. These typically include an alignment system, mating and locking system, fluid connectors, electrical connectors and control !checkout systems. These systems have been designed to various levels of detail based on the needs for manual and/or automation requirements. The Automated Ground Umbilical Systems (AGUS) project is a multi-phase initiative to develop design performance requirements and concepts for launch system umbilicals. The automation aspect minimizes operational time and labor in ground umbilical processing while maintaining reliability. This current phase of the project reviews the design, development, testing and operations of ground umbilicals built for the Saturn, Shuttle, X-33 and Atlas V programs. Based on the design and operations lessons learned from these systems, umbilicals can be optimized for specific applications. The product of this study is a document containing details of existing systems and requirements for future automated umbilical systems with emphasis on design-for-operations (DFO).
Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 2: Concept document
NASA Technical Reports Server (NTRS)
1989-01-01
The Simulation Computer System (SCS) concept document describes and establishes requirements for the functional performance of the SCS system, including interface, logistic, and qualification requirements. The SCS is the computational communications and display segment of the Marshall Space Flight Center (MSFC) Payload Training Complex (PTC). The PTC is the MSFC facility that will train onboard and ground operations personnel to operate the payloads and experiments on board the international Space Station Freedom. The requirements to be satisfied by the system implementation are identified here. The SCS concept document defines the requirements to be satisfied through the implementation of the system capability. The information provides the operational basis for defining the requirements to be allocated to the system components and enables the system organization to assess whether or not the completed system complies with the requirements of the system.
Proximity operations concept design study, task 6
NASA Technical Reports Server (NTRS)
Williams, A. N.
1990-01-01
The feasibility of using optical technology to perform the mission of the proximity operations communications subsystem on Space Station Freedom was determined. Proximity operations mission requirements are determined and the relationship to the overall operational environment of the space station is defined. From this information, the design requirements of the communication subsystem are derived. Based on these requirements, a preliminary design is developed and the feasibility of implementation determined. To support the Orbital Maneuvering Vehicle and National Space Transportation System, the optical system development is straightforward. The requirements on extra-vehicular activity are such as to allow large fields of uncertainty, thus exacerbating the acquisition problem; however, an approach is given that could mitigate this problem. In general, it is found that such a system could indeed perform the proximity operations mission requirement, with some development required to support extra-vehicular activity.
Analysis of navigation and guidance requirements for commercial VTOL operations
NASA Technical Reports Server (NTRS)
Hoffman, W. C.; Zvara, J.; Hollister, W. M.
1975-01-01
The paper presents some results of a program undertaken to define navigation and guidance requirements for commercial VTOL operations in the takeoff, cruise, terminal and landing phases of flight in weather conditions up to and including Category III. Quantitative navigation requirements are given for the parameters range, coverage, operation near obstacles, horizontal accuracy, multiple landing aircraft, multiple pad requirements, inertial/radio-inertial requirements, reliability/redundancy, update rate, and data link requirements in all flight phases. A multi-configuration straw-man navigation and guidance system for commercial VTOL operations is presented. Operation of the system is keyed to a fully automatic approach for navigation, guidance and control, with pilot as monitor-manager. The system is a hybrid navigator using a relatively low-cost inertial sensor with DME updates and MLS in the approach/departure phases.
A new generation of real-time DOS technology for mission-oriented system integration and operation
NASA Technical Reports Server (NTRS)
Jensen, E. Douglas
1988-01-01
Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.
30 CFR 250.442 - What are the requirements for a subsea BOP system?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...
30 CFR 250.442 - What are the requirements for a subsea BOP system?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...
30 CFR 250.442 - What are the requirements for a subsea BOP system?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...
30 CFR 250.442 - What are the requirements for a subsea BOP system?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...
47 CFR 15.517 - Technical requirements for indoor UWB systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...
NASA Technical Reports Server (NTRS)
Homan, Jonathan; Montz, Michael; Sidi-Yekhlef, Ahmed; Ganni, Venkatarao (Rao); Knudsen, Peter; Garcia, Sam; Linza, Robert; Meagher, Daniel; Lauterbauch, John
2008-01-01
NASA Johnson Space Center (JSC) in Houston is currently supplementing its 20K helium refrigeration system to meet the new requirements for testing the James Web Space Telescope in the environmental control Chamber-A (65 dia x 120 high) in Building 32. The new system is required to meet the various operating modes which include a high 20K heat load, a required temperature stability at the load, rapid (but controlled) cool down and warm up and bake out of the chamber. This paper will present the proposed modifications to the existing helium system(s) to incorporate the new requirements and the integration of the new helium refrigerator with the existing two 3.5KW 20K helium refrigerators. In addition, the floating pressure process control philosophy to achieve high efficiency over the operating range (40% to 100% of the refrigeration system capacity), and the required temperature stability of +/- 0.25 K at the load will be discussed. The refrigeration systems ability to naturally seek the operating conditions under various loads and thus minimizing operator involvement and the over all improvements to the system operability and the reliability will be explained.
Code of Federal Regulations, 2010 CFR
2010-07-01
... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...
Code of Federal Regulations, 2013 CFR
2013-07-01
... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...
Code of Federal Regulations, 2011 CFR
2011-07-01
... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...
Managing computer-controlled operations
NASA Technical Reports Server (NTRS)
Plowden, J. B.
1985-01-01
A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
40 CFR 75.48 - Petition for an alternative monitoring system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... method of ensuring an accurate assessment of operating hourly conditions on a real-time basis. (9) A...) Hourly test data for the alternative monitoring system at each required operating level and fuel type... continuous emissions monitoring system at each required operating level and fuel type. The fuel type...
NASA Technical Reports Server (NTRS)
Havens, Glen G.
2007-01-01
MRO project is a system of systems requiring system engineering team to architect, design, integrate, test, and operate these systems at each level of the project. The challenge of system engineering mission objectives into a single mission architecture that can be integrated tested, launched, and operated. Systems engineering must translate high-level requirements into integrated mission design. Systems engineering challenges were overcome utilizing a combination by creative designs built into MRO's flight and ground systems: a) Design of sophisticated spacecraft targeting and data management capabilities b) Establishment of a strong operations team organization; c) Implementation of robust operational processes; and d) Development of strategic ground tools. The MRO system has met the challenge of its driving requirements: a) MRO began its two-year primary science phase on November 7, 2006, and by July 2007, met it minimum requirement to collect 15 Tbits of data after only eight months of operations. Currently we have collected 22 Tbits. b) Based on current performance, mission data return could return 70 Tbits of data by the end of the primary science phase in 2008.
Shuttle payload S-band communications system
NASA Technical Reports Server (NTRS)
Batson, B. H.; Teasdale, W. E.; Pawlowski, J. F.; Schmidt, O. L.
1985-01-01
The Shuttle payload S-band communications system design, operational capabilities, and performance are described in detail. System design requirements, overall system and configuration and operation, and laboratory/flight test results are presented. Payload communications requirements development is discussed in terms of evolvement of requirements as well as the resulting technical challenges encountered in meeting the initial requirements. Initial design approaches are described along with cost-saving initiatives that subsequently had to be made. The resulting system implementation that was finally adopted is presented along with a functional description of the system operation. A description of system test results, problems encountered, how the problems were solved, and the system flight experience to date is presented. Finally, a summary of the advancements made and the lessons learned is discussed.
Navigation and guidance requirements for commercial VTOL operations
NASA Technical Reports Server (NTRS)
Hoffman, W. C.; Hollister, W. M.; Howell, J. D.
1974-01-01
The NASA Langley Research Center (LaRC) has undertaken a research program to develop the navigation, guidance, control, and flight management technology base needed by Government and industry in establishing systems design concepts and operating procedures for VTOL short-haul transportation systems in the 1980s time period. The VALT (VTOL Automatic Landing Technology) Program encompasses the investigation of operating systems and piloting techniques associated with VTOL operations under all-weather conditions from downtown vertiports; the definition of terminal air traffic and airspace requirements; and the development of avionics including navigation, guidance, controls, and displays for automated takeoff, cruise, and landing operations. The program includes requirements analyses, design studies, systems development, ground simulation, and flight validation efforts.
NASA Technical Reports Server (NTRS)
Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.
1990-01-01
The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.
Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A
NASA Technical Reports Server (NTRS)
Woodcock, G. R.
1982-01-01
The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
46 CFR 111.97-3 - General requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-3 General requirements. Each watertight door operating system must meet Subpart H, § 170.270 of this chapter. [CGD 74-125A, 47 FR 15236, Apr. 8...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
Code of Federal Regulations, 2010 CFR
2010-04-01
... required of self-regulatory organizations operating pilot trading systems pursuant to § 240.19b-5 of this... (CONTINUED) FORMS, SECURITIES EXCHANGE ACT OF 1934 Forms for Self-Regulatory Organization Rule Changes and... Associations § 249.821 Form PILOT, information required of self-regulatory organizations operating pilot...
Code of Federal Regulations, 2011 CFR
2011-04-01
... required of self-regulatory organizations operating pilot trading systems pursuant to § 240.19b-5 of this... (CONTINUED) FORMS, SECURITIES EXCHANGE ACT OF 1934 Forms for Self-Regulatory Organization Rule Changes and... Associations § 249.821 Form PILOT, information required of self-regulatory organizations operating pilot...
Code of Federal Regulations, 2013 CFR
2013-04-01
... required of self-regulatory organizations operating pilot trading systems pursuant to § 240.19b-5 of this... (CONTINUED) FORMS, SECURITIES EXCHANGE ACT OF 1934 Forms for Self-Regulatory Organization Rule Changes and... Associations § 249.821 Form PILOT, information required of self-regulatory organizations operating pilot...
Code of Federal Regulations, 2012 CFR
2012-04-01
... required of self-regulatory organizations operating pilot trading systems pursuant to § 240.19b-5 of this... (CONTINUED) FORMS, SECURITIES EXCHANGE ACT OF 1934 Forms for Self-Regulatory Organization Rule Changes and... Associations § 249.821 Form PILOT, information required of self-regulatory organizations operating pilot...
Code of Federal Regulations, 2014 CFR
2014-04-01
... required of self-regulatory organizations operating pilot trading systems pursuant to § 240.19b-5 of this... (CONTINUED) FORMS, SECURITIES EXCHANGE ACT OF 1934 Forms for Self-Regulatory Organization Rule Changes and... Associations § 249.821 Form PILOT, information required of self-regulatory organizations operating pilot...
Exploring Operational Test and Evaluation of Unmanned Aircraft Systems: A Qualitative Case Study
NASA Astrophysics Data System (ADS)
Saliceti, Jose A.
The purpose of this qualitative case study was to explore and identify strategies that may potentially remedy operational test and evaluation procedures used to evaluate Unmanned Aircraft Systems (UAS) technology. The sample for analysis consisted of organizations testing and evaluating UASs (e.g., U.S. Air Force, U.S. Navy, U.S. Army, U.S. Marine Corps, U.S. Coast Guard, and Customs Border Protection). A purposeful sampling technique was used to select 15 subject matter experts in the field of operational test and evaluation of UASs. A questionnaire was provided to participants to construct a descriptive and robust research. Analysis of responses revealed themes related to each research question. Findings revealed operational testers utilized requirements documents to extrapolate measures for testing UAS technology and develop critical operational issues. The requirements documents were (a) developed without the contribution of stakeholders and operational testers, (b) developed with vague or unrealistic measures, and (c) developed without a systematic method to derive requirements from mission tasks. Four approaches are recommended to develop testable operational requirements and assist operational testers: (a) use a mission task analysis tool to derive requirements for mission essential tasks for the system, (b) exercise collaboration among stakeholders and testers to ensure testable operational requirements based on mission tasks, (c) ensure testable measures are used in requirements documents, and (d) create a repository list of critical operational issues by mission areas. The preparation of operational test and evaluation processes for UAS technology is not uniform across testers. The processes in place are not standardized, thus test plan preparation and reporting are different among participants. A standard method to prepare and report UAS technology should be used when preparing and reporting on UAS technology. Using a systematic process, such as mission-based test design, resonated among participants as an analytical method to link UAS mission tasks and measures of performance to the capabilities of the system under test when developing operational test plans. Further research should examine system engineering designs for system requirements traceability matrix of mission tasks and subtasks while using an analysis tool that adequately evaluates UASs with an acceptable level of confidence in the results.
Space Shuttle interactive meteorological data system study
NASA Technical Reports Server (NTRS)
Young, J. T.; Fox, R. J.; Benson, J. M.; Rueden, J. P.; Oehlkers, R. A.
1985-01-01
Although focused toward the operational meteorological support review and definition of an operational meteorological interactive data display systems (MIDDS) requirements for the Space Meteorology Support Group at NASA/Johnson Space Center, the total operational meteorological support requirements and a systems concept for the MIDDS network integration of NASA and Air Force elements to support the National Space Transportation System are also addressed.
Telerobot operator control station requirements
NASA Technical Reports Server (NTRS)
Kan, Edwin P.
1988-01-01
The operator control station of a telerobot system has unique functional and human factors requirements. It has to satisfy the needs of a truly interactive and user-friendly complex system, a telerobot system being a hybrid between a teleoperated and an autonomous system. These functional, hardware and software requirements are discussed, with explicit reference to the design objectives and constraints of the JPL/NASA Telerobot Demonstrator System.
49 CFR 37.33 - Airport transportation systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems operated by public airport operators, which provide designated public transportation and connect.... Public airports which operate fixed route transportation systems are subject to the requirements of this... part. (b) Fixed-route transportation systems operated by public airport operators between the airport...
Solar power satellite system definition study. Volume 3: Operations and systems synthesis, phase 2
NASA Technical Reports Server (NTRS)
1979-01-01
The results of the operations analyses are reported. Some of these analyses examined operations aspects of space vehicle in-space maintenance. Many of the analyses explored in great depth operations concerned the LEO Base cargo handling operations. Personnel transportation operations and cargo packaging were also analyzed. These operations analyses were performed to define the operational requirements for all of the SPS system elements so that equipment and facilities could be synthesized, and to make estimates of the manpower requirements. An overall, integrated, end-to-end description of the SPS operations is presented. The detailed operations analyses, upon which this integrated description was based, are included.
30 CFR 250.440 - What are the general requirements for BOP systems and system components?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements...
40 CFR 63.7830 - What are my monitoring requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) of this section. (1) Install, operate, and maintain a bag leak detection system according to § 63... § 63.7832; or (2) If you do not install and operate a bag leak detection system, you must install... bag leak detection system and COMS are not required for a baghouse that meets the requirements in...
Space Tug Docking Study. Volume 1: Executive Summary
NASA Technical Reports Server (NTRS)
1976-01-01
Results of a detailed systems analysis of the entire rendezvous and docking operation to be performed by the all-up space tug are presented. Specific areas investigated include: generating of operational requirements and a data base of candidate operational techniques and subsystem mechanizations; selection and ranking of integrated system designs capable of meeting the requirements generated; and definition of this simulation/demonstration program required to select and prove the most effective manual, autonomous, and hybrid rendezvous and docking systems.
UTM TCL2 Software Requirements
NASA Technical Reports Server (NTRS)
Smith, Irene S.; Rios, Joseph L.; McGuirk, Patrick O.; Mulfinger, Daniel G.; Venkatesan, Priya; Smith, David R.; Baskaran, Vijayakumar; Wang, Leo
2017-01-01
The Unmanned Aircraft Systems (UAS) Traffic Management (UTM) Technical Capability Level (TCL) 2 software implements the UTM TCL 2 software requirements described herein. These software requirements are linked to the higher level UTM TCL 2 System Requirements. Each successive TCL implements additional UTM functionality, enabling additional use cases. TCL 2 demonstrated how to enable expanded multiple operations by implementing automation for beyond visual line-of-sight, tracking operations, and operations flying over sparsely populated areas.
A Joint Force Medical Command is Required to Fix Combat Casualty Care
2017-10-05
that poses an operations security risk. Author: ☒ PA: ☒ 13. SUPPLEMENTARY NOTES Word Count: 10,665 14. ABSTRACT The Military Health System...15. SUBJECT TERMS Military Health System, Joint Trauma System, Defense Health Agency, PROFIS 16. SECURITY CLASSIFICATION OF: 17...The Military Health System (MHS) is required to provide medical operational forces for military and contingency operations while also providing
20 CFR 670.530 - Are Job Corps centers required to maintain a student accountability system?
Code of Federal Regulations, 2010 CFR
2010-04-01
... student accountability system? 670.530 Section 670.530 Employees' Benefits EMPLOYMENT AND TRAINING... accountability system? Yes, each Job Corps center must establish and operate an effective system to account for... student absence. Each center must operate its student accountability system according to requirements and...
21 CFR 111.135 - What quality control operations are required for product complaints?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control System: Requirements for Quality Control § 111.135 What quality control operations are required for...
47 CFR 22.383 - In-building radiation systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for...
NASA Technical Reports Server (NTRS)
Barro, E.; Delbufalo, A.; Rossi, F.
1993-01-01
The definition of some modern high demanding space systems requires a different approach to system definition and design from that adopted for traditional missions. System functionality is strongly coupled to the operational analysis, aimed at characterizing the dynamic interactions of the flight element with its surrounding environment and its ground control segment. Unambiguous functional, operational and performance requirements are to be defined for the system, thus improving also the successive development stages. This paper proposes a Petri Nets based methodology and two related prototype applications (to ARISTOTELES orbit control and to Hermes telemetry generation) for the operational analysis of space systems through the dynamic modeling of their functions and a related computer aided environment (ISIDE) able to make the dynamic model work, thus enabling an early validation of the system functional representation, and to provide a structured system requirements data base, which is the shared knowledge base interconnecting static and dynamic applications, fully traceable with the models and interfaceable with the external world.
30 CFR 250.440 - What are the general requirements for BOP systems and system components?
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.440 What...
30 CFR 250.440 - What are the general requirements for BOP systems and system components?
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.440 What...
30 CFR 250.440 - What are the general requirements for BOP systems and system components?
Code of Federal Regulations, 2014 CFR
2014-07-01
... ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.440 What...
End effector monitoring system: An illustrated case of operational prototyping
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Land, Sherry A.; Thronesbery, Carroll
1994-01-01
Operational prototyping is introduced to help developers apply software innovations to real-world problems, to help users articulate requirements, and to help develop more usable software. Operational prototyping has been applied to an expert system development project. The expert system supports fault detection and management during grappling operations of the Space Shuttle payload bay arm. The dynamic exchanges among operational prototyping team members are illustrated in a specific prototyping session. We discuss the requirements for operational prototyping technology, types of projects for which operational prototyping is best suited and when it should be applied to those projects.
Automation of Hubble Space Telescope Mission Operations
NASA Technical Reports Server (NTRS)
Burley, Richard; Goulet, Gregory; Slater, Mark; Huey, William; Bassford, Lynn; Dunham, Larry
2012-01-01
On June 13, 2011, after more than 21 years, 115 thousand orbits, and nearly 1 million exposures taken, the operation of the Hubble Space Telescope successfully transitioned from 24x7x365 staffing to 815 staffing. This required the automation of routine mission operations including telemetry and forward link acquisition, data dumping and solid-state recorder management, stored command loading, and health and safety monitoring of both the observatory and the HST Ground System. These changes were driven by budget reductions, and required ground system and onboard spacecraft enhancements across the entire operations spectrum, from planning and scheduling systems to payload flight software. Changes in personnel and staffing were required in order to adapt to the new roles and responsibilities required in the new automated operations era. This paper will provide a high level overview of the obstacles to automating nominal HST mission operations, both technical and cultural, and how those obstacles were overcome.
ERIC Educational Resources Information Center
Czuchry, Andrew J.; And Others
This user's guide describes the functions, logical operations and subroutines, input data requirements, and available outputs of the Training Requirements Analysis Model (TRAMOD), a computerized analytical life cycle cost modeling system for use in the early stages of system design. Operable in a stand-alone mode, TRAMOD can be used for the…
30 CFR 250.440 - What are the general requirements for BOP systems and system components?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.440 What are the general...
The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements
NASA Technical Reports Server (NTRS)
Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray
2012-01-01
In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.
EDOS operations concept and development approach
NASA Technical Reports Server (NTRS)
Knoble, G.; Garman, C.; Alcott, G.; Ramchandani, C.; Silvers, J.
1994-01-01
The Earth Observing System (EOS) Data and Operations System (EDOS) is being developed by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) for the capture, level zero processing, distribution, and backup archiving of high speed telemetry data received from EOS spacecraft. All data received will conform to the Consultative Committee for Space Data Standards (CCSDS) recommendations. The major EDOS goals are to: (1) minimize EOS program costs to implement and operate EDOS; (2) respond effectively to EOS growth requirements; and (3) maintain compatibility with existing and enhanced versions of NASA institutional systems required to support EOS spacecraft. In order to meet these goals, the following objectives have been defined for EDOS: (1) standardize EDOS interfaces to maximize utility for future requirements; (2) emphasize life-cycle cost (LCC) considerations (rather than procurement costs) in making design decisions and meeting reliability, maintainability, availability (RMA) and upgradability requirements; (3) implement data-driven operations to the maximum extent possible to minimize staffing requirements and to maximize system responsiveness; (4) provide a system capable of simultaneously supporting multiple spacecraft, each in different phases of their life-cycles; (5) provide for technology insertion features to accommodate growth and future LCC reductions during the operations phase; and (6) provide a system that is sufficiently robust to accommodate incremental performance upgrades while supporting operations. Operations concept working group meetings were facilitated to help develop the EDOS operations concept. This provided a cohesive concept that met with approval of responsible personnel from the start. This approach not only speeded up the development process by reducing review cycles, it also provided a medium for generating good ideas that were immediately molded into feasible concepts. The operations concept was then used as a basis for the EDOS specification. When it was felt that concept elements did not support detailed requirements, the facilitator process was used to resolve discrepancies or to add new concept elements to support the specification. This method provided an ongoing revisal of the operations concept and prevented large revisions at the end of the requirement analysis phase of system development.
Code of Federal Regulations, 2010 CFR
2010-10-01
... addressing time dependent and independent threats for a transmission pipeline operating below 30% SMYS not in... pipeline system are covered for purposes of the integrity management program requirements, an operator must... system, or an operator may apply one method to individual portions of the pipeline system. (Refer to...
Code of Federal Regulations, 2014 CFR
2014-04-01
... practice operating system in accordance with paragraph (b) of this section, the following requirements..., and the current good manufacturing practice operating system has been shown to comply with the drug... operating system has been shown to comply with the QS regulation, the following provisions of the drug CGMPs...
Code of Federal Regulations, 2013 CFR
2013-04-01
... practice operating system in accordance with paragraph (b) of this section, the following requirements..., and the current good manufacturing practice operating system has been shown to comply with the drug... operating system has been shown to comply with the QS regulation, the following provisions of the drug CGMPs...
Expert system for on-board satellite scheduling and control
NASA Technical Reports Server (NTRS)
Barry, John M.; Sary, Charisse
1988-01-01
An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.
30 CFR 780.11 - Operation plan: General requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...
30 CFR 784.11 - Operation plan: General requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...
49 CFR 236.410 - Locking, hand-operated switch; requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Locking, hand-operated switch; requirements. 236... Traffic Control Systems Standards § 236.410 Locking, hand-operated switch; requirements. (a) Each hand-operated switch in main track shall be locked either electrically or mechanically in normal position...
49 CFR 236.410 - Locking, hand-operated switch; requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Locking, hand-operated switch; requirements. 236... Traffic Control Systems Standards § 236.410 Locking, hand-operated switch; requirements. (a) Each hand-operated switch in main track shall be locked either electrically or mechanically in normal position...
49 CFR 236.410 - Locking, hand-operated switch; requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Locking, hand-operated switch; requirements. 236... Traffic Control Systems Standards § 236.410 Locking, hand-operated switch; requirements. (a) Each hand-operated switch in main track shall be locked either electrically or mechanically in normal position...
49 CFR 236.410 - Locking, hand-operated switch; requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Locking, hand-operated switch; requirements. 236... Traffic Control Systems Standards § 236.410 Locking, hand-operated switch; requirements. (a) Each hand-operated switch in main track shall be locked either electrically or mechanically in normal position...
49 CFR 236.410 - Locking, hand-operated switch; requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Locking, hand-operated switch; requirements. 236... Traffic Control Systems Standards § 236.410 Locking, hand-operated switch; requirements. (a) Each hand-operated switch in main track shall be locked either electrically or mechanically in normal position...
NASA Technical Reports Server (NTRS)
1989-01-01
Requirements are presented for shuttle system definition; performance and design characteristics; shuttle vehicle end item performance and design characteristics; ground operations complex performance and design characteristics; operability and system design and construction standards; and quality control.
40 CFR 258.61 - Post-closure care requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the...) Maintaining and operating the gas monitoring system in accordance with the requirements of § 258.23. (b) The... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
46 CFR 111.97-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-1 Applicability. This subpart applies to electric power-operated watertight door systems required under Subpart H of Part 170 of this chapter. [CGD...
47 CFR 22.951 - Minimum coverage requirement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MOBILE SERVICES Cellular Radiotelephone Service § 22.951 Minimum coverage requirement. Applications for authority to operate a new cellular system in an unserved area, other than those filed by the licensee of an... toward the minimum coverage requirement. Applications for authority to operate a new cellular system in...
Developing a Crew Time Model for Human Exploration Missions to Mars
NASA Technical Reports Server (NTRS)
Battfeld, Bryan; Stromgren, Chel; Shyface, Hilary; Cirillo, William; Goodliff, Kandyce
2015-01-01
Candidate human missions to Mars require mission lengths that could extend beyond those that have previously been demonstrated during crewed Lunar (Apollo) and International Space Station (ISS) missions. The nature of the architectures required for deep space human exploration will likely necessitate major changes in how crews operate and maintain the spacecraft. The uncertainties associated with these shifts in mission constructs - including changes to habitation systems, transit durations, and system operations - raise concerns as to the ability of the crew to complete required overhead activities while still having time to conduct a set of robust exploration activities. This paper will present an initial assessment of crew operational requirements for human missions to the Mars surface. The presented results integrate assessments of crew habitation, system maintenance, and utilization to present a comprehensive analysis of potential crew time usage. Destination operations were assessed for a short (approx. 50 day) and long duration (approx. 500 day) surface habitation case. Crew time allocations are broken out by mission segment, and the availability of utilization opportunities was evaluated throughout the entire mission progression. To support this assessment, the integrated crew operations model (ICOM) was developed. ICOM was used to parse overhead, maintenance and system repair, and destination operations requirements within each mission segment - outbound transit, Mars surface duration, and return transit - to develop a comprehensive estimation of exploration crew time allocations. Overhead operational requirements included daily crew operations, health maintenance activities, and down time. Maintenance and repair operational allocations are derived using the Exploration Maintainability and Analysis Tool (EMAT) to develop a probabilistic estimation of crew repair time necessary to maintain systems functionality throughout the mission.
Automated Instructional Management Systems (AIMS) Version III, Operator's Guide.
ERIC Educational Resources Information Center
New York Inst. of Tech., Old Westbury.
This manual gives the instructions necessary to understand and operate the Automated Instructional Management System (AIMS), utilizing IBM System 360, Model 30/Release 20 Disk Operating System, and the OpScan 100 System Reader and Tape Unit. It covers the AIMS III system initialization, system and operational input, requirements, master response…
A Scenario-Based Process for Requirements Development: Application to Mission Operations Systems
NASA Technical Reports Server (NTRS)
Bindschadler, Duane L.; Boyles, Carole A.
2008-01-01
The notion of using operational scenarios as part of requirements development during mission formulation (Phases A & B) is widely accepted as good system engineering practice. In the context of developing a Mission Operations System (MOS), there are numerous practical challenges to translating that notion into the cost-effective development of a useful set of requirements. These challenges can include such issues as a lack of Project-level focus on operations issues, insufficient or improper flowdown of requirements, flowdown of immature or poor-quality requirements from Project level, and MOS resource constraints (personnel expertise and/or dollars). System engineering theory must be translated into a practice that provides enough structure and standards to serve as guidance, but that retains sufficient flexibility to be tailored to the needs and constraints of a particular MOS or Project. We describe a detailed, scenario-based process for requirements development. Identifying a set of attributes for high quality requirements, we show how the portions of the process address many of those attributes. We also find that the basic process steps are robust, and can be effective even in challenging Project environments.
Performance prediction evaluation of ceramic materials in point-focusing solar receivers
NASA Technical Reports Server (NTRS)
Ewing, J.; Zwissler, J.
1979-01-01
A performance prediction was adapted to evaluate the use of ceramic materials in solar receivers for point focusing distributed applications. System requirements were determined including the receiver operating environment and system operating parameters for various engine types. Preliminary receiver designs were evolved from these system requirements. Specific receiver designs were then evaluated to determine material functional requirements.
Aerodynamics as a subway design parameter
NASA Technical Reports Server (NTRS)
Kurtz, D. W.
1976-01-01
A parametric sensitivity study has been performed on the system operational energy requirement in order to guide subway design strategy. Aerodynamics can play a dominant or trivial role, depending upon the system characteristics. Optimization of the aerodynamic parameters may not minimize the total operational energy. Isolation of the station box from the tunnel and reduction of the inertial power requirements pay the largest dividends in terms of the operational energy requirement.
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Reports Required To Be Made by Operators of Credit Card Systems § 1028.300 General. Operators of credit card systems are... contained in that subpart which apply to operators of credit card systems. ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Reports Required To Be Made by Operators of Credit Card Systems § 1028.300 General. Operators of credit card systems are... contained in that subpart which apply to operators of credit card systems. ...
Manned orbital systems concepts study. Book 2: Requirements for extended-duration missions
NASA Technical Reports Server (NTRS)
1975-01-01
In order to provide essential data needed in long-range program planning, the Manned Orbital Systems Concepts (MOSC) study attempted to define, evaluate, and compare concepts for manned orbital systems that provide extended experiment mission capabilities in space, flexibility of operation, and growth potential. Specific areas discussed include roles and requirements for man in future space missions, requirements for extended capability, mission/payload concepts, and preliminary design and operational requirements.
LABORATORY PROCESS CONTROLLER USING NATURAL LANGUAGE COMMANDS FROM A PERSONAL COMPUTER
NASA Technical Reports Server (NTRS)
Will, H.
1994-01-01
The complex environment of the typical research laboratory requires flexible process control. This program provides natural language process control from an IBM PC or compatible machine. Sometimes process control schedules require changes frequently, even several times per day. These changes may include adding, deleting, and rearranging steps in a process. This program sets up a process control system that can either run without an operator, or be run by workers with limited programming skills. The software system includes three programs. Two of the programs, written in FORTRAN77, record data and control research processes. The third program, written in Pascal, generates the FORTRAN subroutines used by the other two programs to identify the user commands with the user-written device drivers. The software system also includes an input data set which allows the user to define the user commands which are to be executed by the computer. To set the system up the operator writes device driver routines for all of the controlled devices. Once set up, this system requires only an input file containing natural language command lines which tell the system what to do and when to do it. The operator can make up custom commands for operating and taking data from external research equipment at any time of the day or night without the operator in attendance. This process control system requires a personal computer operating under MS-DOS with suitable hardware interfaces to all controlled devices. The program requires a FORTRAN77 compiler and user-written device drivers. This program was developed in 1989 and has a memory requirement of about 62 Kbytes.
21 CFR 111.355 - What are the design requirements for manufacturing operations?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What are the design requirements for manufacturing... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control System: Requirements for Manufacturing Operations § 111.355 What are the design requirements for...
Operator Support System Design forthe Operation of RSG-GAS Research Reactor
NASA Astrophysics Data System (ADS)
Santoso, S.; Situmorang, J.; Bakhri, S.; Subekti, M.; Sunaryo, G. R.
2018-02-01
The components of RSG-GAS main control room are facing the problem of material ageing and technology obsolescence as well, and therefore the need for modernization and refurbishment are essential. The modernization in control room can be applied on the operator support system which bears the function in providing information for assisting the operator in conducting diagnosis and actions. The research purpose is to design an operator support system for RSG-GAS control room. The design was developed based on the operator requirement in conducting task operation scenarios and the reactor operation characteristics. These scenarios include power operation, low power operation and shutdown/scram reactor. The operator support system design is presented in a single computer display which contains structure and support system elements e.g. operation procedure, status of safety related components and operational requirements, operation limit condition of parameters, alarm information, and prognosis function. The prototype was developed using LabView software and consisted of components structure and features of the operator support system. Information of each component in the operator support system need to be completed before it can be applied and integrated in the RSG-GAS main control room.
UTM UAS Service Supplier Specification
NASA Technical Reports Server (NTRS)
Rios, Joseph Lucio
2017-01-01
Within the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system, the UAS Service Supplier (USS) is a key component. The USS serves several functions. At a high level, those include the following: Bridging communication between UAS Operators and Flight Information Management System (FIMS) Supporting planning of UAS operations Assisting strategic deconfliction of the UTM airspace Providing information support to UAS Operators during operations Helping UAS Operators meet their formal requirements This document provides the minimum set of requirements for a USS. In order to be recognized as a USS within UTM, successful demonstration of satisfying the requirements described herein will be a prerequisite. To ensure various desired qualities (security, fairness, availability, efficiency, maintainability, etc.), this specification relies on references to existing public specifications whenever possible.
GSFC Systems Test and Operation Language (STOL) functional requirements and language description
NASA Technical Reports Server (NTRS)
Desjardins, R.; Hall, G.; Mcguire, J.; Merwarth, P.; Mocarsky, W.; Truszkowski, W.; Villasenor, A.; Brosi, F.; Burch, P.; Carey, D.
1978-01-01
The Systems Tests and Operation Language (STOL) provides the means for user communication with payloads, applications programs, and other ground system elements. It is a systems operation language that enables an operator or user to communicate a command to a computer system. The system interprets each high level language directive from the user and performs the indicated action, such as executing a program, printing out a snapshot, or sending a payload command. This document presents the following: (1) required language features and implementation considerations; (2) basic capabilities; (3) telemetry, command, and input/output directives; (4) procedure definition and control; (5) listing, extension, and STOL nucleus capabilities.
46 CFR 27.205 - What are the requirements for internal communication systems on towing vessels?
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems on towing vessels? 27.205 Section 27.205 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY... fitted with a communication system between the engine room and the operating station that— (1) Consists... required to have internal communication systems. (c) When the operating-station's engine controls and the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 60.1765 Section 60.1765 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values...
Code of Federal Regulations, 2010 CFR
2010-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 60.1765 Section 60.1765 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... continuous emission monitoring systems and continuous opacity monitoring system? Use the required span values...
Study of application of space telescope science operations software for SIRTF use
NASA Technical Reports Server (NTRS)
Dignam, F.; Stetson, E.; Allendoerfer, W.
1985-01-01
The design and development of the Space Telescope Science Operations Ground System (ST SOGS) was evaluated to compile a history of lessons learned that would benefit NASA's Space Infrared Telescope Facility (SIRTF). Forty-nine specific recommendations resulted and were categorized as follows: (1) requirements: a discussion of the content, timeliness and proper allocation of the system and segment requirements and the resulting impact on SOGS development; (2) science instruments: a consideration of the impact of the Science Instrument design and data streams on SOGS software; and (3) contract phasing: an analysis of the impact of beginning the various ST program segments at different times. Approximately half of the software design and source code might be useable for SIRTF. Transportability of this software requires, at minimum, a compatible DEC VAX-based architecture and VMS operating system, system support software similar to that developed for SOGS, and continued evolution of the SIRTF operations concept and requirements such that they remain compatible with ST SOGS operation.
Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1
NASA Technical Reports Server (NTRS)
Dodson, D. B.
1975-01-01
The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
DOT National Transportation Integrated Search
2009-10-01
Transit Operations Decision Support Systems (TODSS) are systems designed to support dispatchers and others in real-time operations : management in response to incidents, special events, and other changing conditions in order to improve operating spee...
Technology requirements and readiness for very large vehicles
NASA Technical Reports Server (NTRS)
Conner, D. W.
1979-01-01
Common concerns of very large vehicles in the areas of economics, transportation system interfaces and operational problems were reviewed regarding their influence on vehicle configurations and technology. Fifty-four technology requirements were identified which are judged to be unique, or particularly critical, to very large vehicles. The requirements were about equally divided among the four general areas of aero/hydrodynamics, propulsion and acoustics, structures, and vehicle systems and operations. The state of technology readiness was judged to be poor to fair for slightly more than one half of the requirements. In the classic disciplinary areas, the state of technology readiness appears to be more advanced than for vehicle systems and operations.
NASA Astrophysics Data System (ADS)
Selvy, Brian M.; Claver, Charles; Willman, Beth; Petravick, Don; Johnson, Margaret; Reil, Kevin; Marshall, Stuart; Thomas, Sandrine; Lotz, Paul; Schumacher, German; Lim, Kian-Tat; Jenness, Tim; Jacoby, Suzanne; Emmons, Ben; Axelrod, Tim
2016-08-01
We† provide an overview of the Model Based Systems Engineering (MBSE) language, tool, and methodology being used in our development of the Operational Plan for Large Synoptic Survey Telescope (LSST) operations. LSST's Systems Engineering (SE) team is using a model-based approach to operational plan development to: 1) capture the topdown stakeholders' needs and functional allocations defining the scope, required tasks, and personnel needed for operations, and 2) capture the bottom-up operations and maintenance activities required to conduct the LSST survey across its distributed operations sites for the full ten year survey duration. To accomplish these complimentary goals and ensure that they result in self-consistent results, we have developed a holistic approach using the Sparx Enterprise Architect modeling tool and Systems Modeling Language (SysML). This approach utilizes SysML Use Cases, Actors, associated relationships, and Activity Diagrams to document and refine all of the major operations and maintenance activities that will be required to successfully operate the observatory and meet stakeholder expectations. We have developed several customized extensions of the SysML language including the creation of a custom stereotyped Use Case element with unique tagged values, as well as unique association connectors and Actor stereotypes. We demonstrate this customized MBSE methodology enables us to define: 1) the rolls each human Actor must take on to successfully carry out the activities associated with the Use Cases; 2) the skills each Actor must possess; 3) the functional allocation of all required stakeholder activities and Use Cases to organizational entities tasked with carrying them out; and 4) the organization structure required to successfully execute the operational survey. Our approach allows for continual refinement utilizing the systems engineering spiral method to expose finer levels of detail as necessary. For example, the bottom-up, Use Case-driven approach will be deployed in the future to develop the detailed work procedures required to successfully execute each operational activity.
Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…
49 CFR 1544.211 - Use of X-ray systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 9 2012-10-01 2012-10-01 false Use of X-ray systems. 1544.211 Section 1544.211... COMMERCIAL OPERATORS Operations § 1544.211 Use of X-ray systems. (a) TSA authorization required. No aircraft operator may use any X-ray system within the United States or under the aircraft operator's operational...
21 CFR 111.65 - What are the requirements for quality control operations?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What are the requirements for quality control... Process Control System § 111.65 What are the requirements for quality control operations? You must implement quality control operations in your manufacturing, packaging, labeling, and holding operations for...
NASA Technical Reports Server (NTRS)
Randall, Roger M.
1987-01-01
Orbit Transfer Vehicle (OTV) processing at the space station is divided into two major categories: OTV processing and assembly operations, and support operations. These categories are further subdivided into major functional areas to allow development of detailed OTV processing procedures and timelines. These procedures and timelines are used to derive the specific space station accommodations necessary to support OTV activities. The overall objective is to limit impact on OTV processing requirements on space station operations, involvement of crew, and associated crew training and skill requirements. The operational concept maximizes use of automated and robotic systems to perform all required OTV servicing and maintenance tasks. Only potentially critical activities would require direct crew involvement or supervision. EVA operations are considered to be strictly contingency back-up to failure of the automated and robotic systems, with the exception of the initial assembly of Space-Based OTV accommodations at the space station, which will require manned involvement.
Network operating system focus technology
NASA Technical Reports Server (NTRS)
1985-01-01
An activity structured to provide specific design requirements and specifications for the Space Station Data Management System (DMS) Network Operating System (NOS) is outlined. Examples are given of the types of supporting studies and implementation tasks presently underway to realize a DMS test bed capability to develop hands-on understanding of NOS requirements as driven by actual subsystem test beds participating in the overall Johnson Space Center test bed program. Classical operating system elements and principal NOS functions are listed.
MODIS information, data and control system (MIDACS) operations concepts
NASA Technical Reports Server (NTRS)
Han, D.; Salomonson, V.; Ormsby, J.; Ardanuy, P.; Mckay, A.; Hoyt, D.; Jaffin, S.; Vallette, B.; Sharts, B.; Folta, D.
1988-01-01
The MODIS Information, Data, and Control System (MIDACS) Operations Concepts Document provides a basis for the mutual understanding between the users and the designers of the MIDACS, including the requirements, operating environment, external interfaces, and development plan. In defining the concepts and scope of the system, how the MIDACS will operate as an element of the Earth Observing System (EOS) within the EosDIS environment is described. This version follows an earlier release of a preliminary draft version. The individual operations concepts for planning and scheduling, control and monitoring, data acquisition and processing, calibration and validation, data archive and distribution, and user access do not yet fully represent the requirements of the data system needed to achieve the scientific objectives of the MODIS instruments and science teams. The teams are not yet formed; however, it is possible to develop the operations concepts based on the present concept of EosDIS, the level 1 and level 2 Functional Requirements Documents, and through interviews and meetings with key members of the scientific community. The operations concepts were exercised through the application of representative scenarios.
Crew-Centered Operations: What HAL 9000 Should Have Been
NASA Technical Reports Server (NTRS)
Korsmeyer, David J.; Clancy, Daniel J.; Crawford, James M.; Drummond, Mark E.
2005-01-01
To date, manned space flight has maintained the locus of control for the mission on the ground. Mission control performs tasks such as activity planning, system health management, resource allocation, and astronaut health monitoring. Future exploration missions require the locus of control to shift to on-board due light speed constraints and potential loss of communication. The lunar campaign must begin to utilize a shared control approach to validate and understand the limitations of the technology allowing astronauts to oversee and direct aspects of operation that require timely decision making. Crew-centered Operations require a system-level approach that integrates multiple technologies together to allow a crew-prime concept of operations. This paper will provide an overview of the driving mission requirements, highlighting the limitations of existing approaches to mission operations and identifying the critical technologies necessary to enable a crew-centered mode of operations. The paper will focus on the requirements, trade spaces, and concepts for fulfillment of this capability. The paper will provide a broad overview of relevant technologies including: Activity Planning and Scheduling; System Monitoring; Repair and Recovery; Crew Work Practices.
NASA Technical Reports Server (NTRS)
1985-01-01
The initial task in the Space Station Data System (SSDS) Analysis/Architecture Study is the definition of the functional and key performance requirements for the SSDS. The SSDS is the set of hardware and software, both on the ground and in space, that provides the basic data management services for Space Station customers and systems. The primary purpose of the requirements development activity was to provide a coordinated, documented requirements set as a basis for the system definition of the SSDS and for other subsequent study activities. These requirements should also prove useful to other Space Station activities in that they provide an indication of the scope of the information services and systems that will be needed in the Space Station program. The major results of the requirements development task are as follows: (1) identification of a conceptual topology and architecture for the end-to-end Space Station Information Systems (SSIS); (2) development of a complete set of functional requirements and design drivers for the SSIS; (3) development of functional requirements and key performance requirements for the Space Station Data System (SSDS); and (4) definition of an operating concept for the SSIS. The operating concept was developed both from a Space Station payload customer and operator perspective in order to allow a requirements practicality assessment.
Returning to the Moon: Building the Systems Engineering Base for Successful Science Missions
NASA Astrophysics Data System (ADS)
Eppler, D.; Young, K.; Bleacher, J.; Klaus, K.; Barker, D.; Evans, C.; Tewksbury, B.; Schmitt, H.; Hurtado, J.; Deans, M.; Yingst, A.; Spudis, P.; Bell, E.; Skinner, J.; Cohen, B.; Head, J.
2018-04-01
Enabling science return on future lunar missions will require coordination between the science community, design engineers, and mission operators. Our chapter is based on developing science-based systems engineering and operations requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keck, R.D.
1997-01-21
The purpose of this document is to record the technical evaluation of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements, WHC-SD-CP-OSR- 010, Rev. 0. Kay 1994, Section 3.2.3, `Supply Ventilation System Seismic Shutdown.` This document, with its appendices, provides the following: 1. The system functional requirements for determining system operability (Section 3). 2. Evaluations of equipment to determine the safety boundary for the system (Section 4). 3. A list of annotated drawings which show the safety envelope boundaries (Appendix C). 4. A list of the safety envelope equipment (Appendix B). 5. Functionalmore » requirements for the individual safety envelope equipment, including appropriate setpoints and process parameters (Section 4.1). 6. A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the system equipment within the safety envelope (Sections 5 and 6 and Appendix A).« less
Energy budget for an energywood harvesting system
W.F. Watson; D.E. Miller; B.J. Stokes; M.L. Broussard
1987-01-01
The fuel and energy requirements for alternative energywood harvesting operations were determined from field operations. Comparisons were made among the total energy requirements including transportation for conventional operation and one- and two-pass energywood operations. The two-pass energywood operation requlred more energy per green ton than the other operations...
2016-04-30
determining the optimal design requirements of a new system, which will operate along with other existing systems to provide a set of overarching...passenger airline transportation (Mane et al., 2007; Govindaraju et al., 2015). Uncertainty in Fleet Operations The uncertainty associated with the...demand can provide the basis for a commercial passenger airline problem. The operations of the commercial air travel industry differ from military
Subsea approach to work systems development
NASA Technical Reports Server (NTRS)
Gernhardt, M. L.; Frisbie, F. R.; Brown, C. E.
1988-01-01
Self-contained undersea working environments with applications to space station EVA environments are discussed. Physiological limitations include decompression, inert gas narcosis, high-pressure nervous system, gas toxicity, and thermal limitations. Work task requirements include drilling support, construction, inspection, and repair. Work systems include hyperbaric diving, atmospheric work systems, tele-operated work systems, and hybrid systems. Each type of work system is outlined in terms of work capabilities, special interface requirements, and limitations. Various operational philosophies are discussed. The evolution of work systems in the subsea industry has been the result of direct operational experience in a competitive market.
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance with the operation and maintenance requirements that apply to me? 63.7745 Section 63.7745....7745 How do I demonstrate continuous compliance with the operation and maintenance requirements that... maintenance requirements of § 63.7710 by: (1) Making monthly inspections of capture systems and initiating...
Intent inferencing with a model-based operator's associate
NASA Technical Reports Server (NTRS)
Jones, Patricia M.; Mitchell, Christine M.; Rubin, Kenneth S.
1989-01-01
A portion of the Operator Function Model Expert System (OFMspert) research project is described. OFMspert is an architecture for an intelligent operator's associate or assistant that can aid the human operator of a complex, dynamic system. Intelligent aiding requires both understanding and control. The understanding (i.e., intent inferencing) ability of the operator's associate is discussed. Understanding or intent inferencing requires a model of the human operator; the usefulness of an intelligent aid depends directly on the fidelity and completeness of its underlying model. The model chosen for this research is the operator function model (OFM). The OFM represents operator functions, subfunctions, tasks, and actions as a heterarchic-hierarchic network of finite state automata, where the arcs in the network are system triggering events. The OFM provides the structure for intent inferencing in that operator functions and subfunctions correspond to likely operator goals and plans. A blackboard system similar to that of Human Associative Processor (HASP) is proposed as the implementation of intent inferencing function. This system postulates operator intentions based on current system state and attempts to interpret observed operator actions in light of these hypothesized intentions.
30 CFR 250.434 - What are the recordkeeping requirements for diverter actuations and tests?
Code of Federal Regulations, 2014 CFR
2014-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.434 What are the recordkeeping... the facility for the duration of drilling the well. Blowout Preventer (BOP) System Requirements ...
30 CFR 250.434 - What are the recordkeeping requirements for diverter actuations and tests?
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.434 What are the recordkeeping... the facility for the duration of drilling the well. Blowout Preventer (BOP) System Requirements ...
30 CFR 250.434 - What are the recordkeeping requirements for diverter actuations and tests?
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.434 What are the recordkeeping... the facility for the duration of drilling the well. Blowout Preventer (BOP) System Requirements ...
40 CFR 63.11552 - What are my monitoring requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., operate, and maintain a bag leak detection system for each fabric filter according to the requirements in..., operate, and maintain a bag leak detection system for each fabric filter according to paragraphs (c)(1) through (4) of this section. (1) Each bag leak detection system must meet the specifications and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Performance limitations of bilateral force reflection imposed by operator dynamic characteristics
NASA Technical Reports Server (NTRS)
Chapel, Jim D.
1989-01-01
A linearized, single-axis model is presented for bilateral force reflection which facilitates investigation into the effects of manipulator, operator, and task dynamics, as well as time delay and gain scaling. Structural similarities are noted between this model and impedance control. Stability results based upon this model impose requirements upon operator dynamic characteristics as functions of system time delay and environmental stiffness. An experimental characterization reveals the limited capabilities of the human operator to meet these requirements. A procedure is presented for determining the force reflection gain scaling required to provide stability and acceptable operator workload. This procedure is applied to a system with dynamics typical of a space manipulator, and the required gain scaling is presented as a function of environmental stiffness.
46 CFR 184.610 - Public address systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... public address system must be a fixed installation and be audible during normal operating conditions... system operable from the operating station. (d) On a vessel of not more than 19.8 meters (65 feet) in... passengers, a public address system is not required if a public announcement made from operating station...
Code of Federal Regulations, 2011 CFR
2011-07-01
... opacity monitoring system and how are the data used? 62.15215 Section 62.15215 Protection of Environment... required for my continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each...
NASA Technical Reports Server (NTRS)
1973-01-01
Information required to calibrate, functionally check, and operate the Instrumentation Branch equipment on the NASA-6 aircraft is provided. All procedures required for preflight checks and in-flight operation of the NASA-6 atmospheric measuring station are given. The calibration section is intended for only that portion of the system maintained and calibrated by IN-MSD-12 Systems Operation contractor personnel. Maintenance is not included.
A network for continuous monitoring of water quality in the Sabine River basin, Texas and Louisiana
Blakey, J.F.; Skinner, P.W.
1973-01-01
Level I operations at a proposed site would monitor current and potential problems, water-quality changes in subreaches of streams, and water-quality trends in time and place. Level II operations would monitor current or potential problems only. An optimum system would require Level I operations at all nine stations. A minimum system would require Level II operations at most of the stations.
Automated Derivation of Complex System Constraints from User Requirements
NASA Technical Reports Server (NTRS)
Muery, Kim; Foshee, Mark; Marsh, Angela
2006-01-01
International Space Station (ISS) payload developers submit their payload science requirements for the development of on-board execution timelines. The ISS systems required to execute the payload science operations must be represented as constraints for the execution timeline. Payload developers use a software application, User Requirements Collection (URC), to submit their requirements by selecting a simplified representation of ISS system constraints. To fully represent the complex ISS systems, the constraints require a level of detail that is beyond the insight of the payload developer. To provide the complex representation of the ISS system constraints, HOSC operations personnel, specifically the Payload Activity Requirements Coordinators (PARC), manually translate the payload developers simplified constraints into detailed ISS system constraints used for scheduling the payload activities in the Consolidated Planning System (CPS). This paper describes the implementation for a software application, User Requirements Integration (URI), developed to automate the manual ISS constraint translation process.
Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…
Requirements and specifications of the space telescope for scientific operations
NASA Technical Reports Server (NTRS)
West, D. K.
1976-01-01
Requirements for the scientific operations of the Space Telescope and the Science Institute are used to develop operational interfaces between user scientists and the NASA ground system. General data systems are defined for observatory scheduling, daily science planning, and science data management. Hardware, software, manpower, and space are specified for several science institute locations and support options.
14 CFR 121.313 - Miscellaneous equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...
14 CFR 121.313 - Miscellaneous equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...
Satellite services system analysis study. Volume 5: Programmatics
NASA Technical Reports Server (NTRS)
1981-01-01
The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.
NASA Technical Reports Server (NTRS)
Nainiger, J. J.; Burns, R. K.; Easley, A. J.
1982-01-01
A performance and operational economics analysis is presented for an integrated-gasifier, combined-cycle (IGCC) system to meet the steam and baseload electrical requirements. The effect of time variations in steam and electrial requirements is included. The amount and timing of electricity purchases from sales to the electric utility are determined. The resulting expenses for purchased electricity and revenues from electricity sales are estimated by using an assumed utility rate structure model. Cogeneration results for a range of potential IGCC cogeneration system sizes are compared with the fuel consumption and costs of natural gas and electricity to meet requirements without cogeneration. The results indicate that an IGCC cogeneration system could save about 10 percent of the total fuel energy presently required to supply steam and electrical requirements without cogeneration. Also for the assumed future fuel and electricity prices, an annual operating cost savings of 21 percent to 26 percent could be achieved with such a cogeneration system. An analysis of the effects of electricity price, fuel price, and system availability indicates that the IGCC cogeneration system has a good potential for economical operation over a wide range in these assumptions.
Advancing Green Remediation Cleanup Practices in the Air Force
2011-05-12
381 Remedial Systems in Operation * Energy Intensive (38%) Low Energy/Passive (48%) Other *Based on FY08 EDITT System Inventory as of 15 March...requirements over long periods, systems which do not require continuous operation Help ER RPMs decide on use of renewable energy Simple enough to be used...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
7 CFR 1730.26 - Certification.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.26 Certification. (a) Engineer's certification. Where provided for in the borrower's loan documents, RUS may require the borrower to provide an “Engineer's Certification” as to the condition of the borrower's system...
High flexible Hydropower Generation concepts for future grids
NASA Astrophysics Data System (ADS)
Hell, Johann
2017-04-01
The ongoing changes in electric power generation are resulting in new requirements for the classical generating units. In consequence a paradigm change in operation of power systems is necessary and a new approach in finding solutions is needed. The presented paper is dealing with the new requirements on current and future energy systems with the focus on hydro power generation. A power generation landscape for some European regions is shown and generation and operational flexibility is explained. Based on the requirements from the Transmission System Operator in UK, the transient performance of a Pumped Storage installation is discussed.
Implementation of NASTRAN on the IBM/370 CMS operating system
NASA Technical Reports Server (NTRS)
Britten, S. S.; Schumacker, B.
1980-01-01
The NASA Structural Analysis (NASTRAN) computer program is operational on the IBM 360/370 series computers. While execution of NASTRAN has been described and implemented under the virtual storage operating systems of the IBM 370 models, the IBM 370/168 computer can also operate in a time-sharing mode under the virtual machine operating system using the Conversational Monitor System (CMS) subset. The changes required to make NASTRAN operational under the CMS operating system are described.
40 CFR 75.10 - General operating requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... part, a flow monitoring system and a CO2 continuous emission monitoring system that uses an O2...) Primary Measurement Requirement. The owner or operator shall measure opacity, and all SO2, NOX, and CO2... continuous emission monitoring system (consisting of a NOX pollutant concentration monitor and an O2 or CO2...
40 CFR 75.10 - General operating requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... part, a flow monitoring system and a CO2 continuous emission monitoring system that uses an O2...) Primary Measurement Requirement. The owner or operator shall measure opacity, and all SO2, NOX, and CO2... continuous emission monitoring system (consisting of a NOX pollutant concentration monitor and an O2 or CO2...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
33 CFR 150.619 - What are the fall arrest system requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false What are the fall arrest system... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Fall Arrest § 150.619 What are the fall arrest system requirements? (a) The deepwater port operator must ensure that...
14 CFR 121.255 - Flammable fluids.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Special Airworthiness Requirements § 121.255 Flammable fluids. (a) No tanks or reservoirs that are a part of a system containing flammable fluids or gases may be located in...
14 CFR 121.255 - Flammable fluids.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Special Airworthiness Requirements § 121.255 Flammable fluids. (a) No tanks or reservoirs that are a part of a system containing flammable fluids or gases may be located in...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... ceasing operations of XLE, the Exchange has solely operated an options market. The System will allow PSX..., Display and Execution The System will operate, and orders can be entered into the System, from 9 a.m. to 5... satisfies this requirement. \\63\\ In considering the operation of automated execution systems operated by an...
NASA Technical Reports Server (NTRS)
Tow, David
2010-01-01
This paper discusses the methodology, requirements, tests, and results of the implementation of the current operating capability for the Enhanced Flight Termination System (EFTS) at the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC). The implementation involves the development of the EFTS at NASA DFRC starting from the requirements to system safety review to full end to end system testing, and concluding with the acceptance of the system as an operational system. The paper discusses the first operational usage and subsequent flight utilizing EFTS successfully.
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
47 CFR 80.1073 - Radio operator requirements for ship stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Radio operator requirements for ship stations... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Global Maritime Distress and Safety System (GMDSS) General Provisions § 80.1073 Radio operator requirements for ship stations. (a) Ships must carry at least...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
Urban Combat Advanced Training Technology (Technologie Avancee d’Entrainement au Combat Urbain)
2010-04-01
JRTC Joint Readiness Training Center JRTC-MOUT-IS Joint Readiness Training Center Military Operations in Urbanised Terrain Instrumentation System...did not support or identify joint or multi-national requirements for conducting effective military operations in an urbanised environment. Very few...Requirements Document (ORD) for the Joint Readiness Training Center (JRTC) Military Operations on Urbanised Terrain (MOUT) Instrumentation System
NASA Astrophysics Data System (ADS)
Nix, Michael B.
2005-12-01
Early design decisions in the development of space launch systems determine the costs to acquire and operate launch systems. Some sources indicate that as much as 90% of life cycle costs are fixed by the end of the critical design review phase. System characteristics determined by these early decisions are major factors in the acquisition cost of flight hardware elements and facilities and influence operations costs through the amount of maintenance and support labor required to sustain system function. Operations costs are also dependent on post-development management decisions regarding how much labor will be deployed to meet requirements of market demand and ownership profit. The ability to perform early trade-offs between these costs is vital to the development of systems that have the necessary capacity to provide service and are profitable to operate. An Excel-based prototype model was developed for making early analyses of trade-offs between the costs to operate a space launch system and to acquire the necessary assets to meet a given set of operational requirements. The model, integrating input from existing models and adding missing capability, allows the user to make such trade-offs across a range of operations concepts (required flight rates, staffing levels, shifts per workday, workdays per week and per year, unreliability, wearout and depot maintenance) and the number, type and capability of assets (flight hardware elements, processing and supporting facilities and infrastructure). The costs and capabilities of hypothetical launch systems can be modeled as a function of interrelated turnaround times and labor resource levels, and asset loss and retirement. The number of flight components and facilities required can be calculated and the operations and acquisition costs compared for a specified scenario. Findings, based on the analysis of a hypothetical two stage to orbit, reusable, unmanned launch system, indicate that the model is suitable for the trade-off analyses desired. The minimum turnaround time/maximum labor allocation for specific hardware configurations and characteristics and corresponding asset requirements can be estimated. Either turnaround time or resources can be varied and the resulting operations and acquisition costs can be compared. Asset reliability, wearout and depot maintenance intervals and durations can be varied as well to analyze the effects on costs. Likewise, the effects on operations and acquisitions costs of the introduction of alternative technologies that affect reliability, maintainability and supportability in various hardware configurations can be evaluated.
IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations
NASA Technical Reports Server (NTRS)
1975-01-01
A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, W.F.
The purpose of this document is to provide the definition and means of maintaining the Safety Envelope (SE) related to the Criticality Alarm System (CAS). This document provides amplification of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements (OSR), WHC-SD-CP-OSR-010, Rev. 0, 1994, Section 3.1.2, Criticality Detectors and Alarms. This document, with its appendices, provides the following: (1) System functional requirements for determining system operability (Section 3); (2) A list of annotated system block diagrams which indicate the safety envelope boundaries (Appendix C); (3) A list of the Safety Class 1 andmore » 2 Safety Envelope (SC-1/2 SE) equipment for input into the Master Component Index (Appendix B); (4) Functional requirements for individual SC-1/2 SE components, including appropriate setpoints and process parameters (Section 6 and Appendix A); (5) A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the SC-1/2 SE components as required by the LCO (Section 6 and Appendix A).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mankamo, T.; Kim, I.S.; Yang, Ji Wu
Failures in the auxiliary feedwater (AFW) system of pressurized water reactors (PWRs) are considered to involve substantial risk whether a decision is made to either continue power operation while repair is being done, or to shut down the plant to undertake repairs. Technical specification action requirements usually require immediate plant shutdown in the case of multiple failures in the system (in some cases, immediate repair of one train is required when all AFW trains fail). This paper presents a probabilistic risk assessment-based method to quantitatively evaluate and compare both the risks of continued power operation and of shutting the plantmore » down, given known failures in the system. The method is applied to the AFW system for four different PWRs. Results show that the risk of continued power operation and plant shutdown both are substantial, but the latter is larger than the former over the usual repair time. This was proven for four plants with different designs: two operating Westinghouse plants, one operating Asea-Brown Boveri Combustion Engineering Plant, and one of evolutionary design. The method can be used to analyze individual plant design and to improve AFW action requirements using risk-informed evaluations.« less
Range and mission scheduling automation using combined AI and operations research techniques
NASA Technical Reports Server (NTRS)
Arbabi, Mansur; Pfeifer, Michael
1987-01-01
Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Monitoring and control technologies for bioregenerative life support systems/CELSS
NASA Technical Reports Server (NTRS)
Knott, William M.; Sager, John C.
1991-01-01
The development of a controlled Ecological Life Support System (CELSS) will require NASA to develop innovative monitoring and control technologies to operate the different components of the system. Primary effort over the past three to four years has been directed toward the development of technologies to operate a biomass production module. Computer hardware and software required to operate, collect, and summarize environmental data for a large plant growth chamber facility were developed and refined. Sensors and controls required to collect information on such physical parameters as relative humidity, temperature, irradiance, pressure, and gases in the atmosphere; and PH, dissolved oxygen, fluid flow rates, and electrical conductivity in the nutrient solutions are being developed and tested. Technologies required to produce high artificial irradiance for plant growth and those required to collect and transport natural light into a plant growth chamber are also being evaluated. Significant effort was directed towards the development and testing of a membrane nutrient delivery system required to manipulate, seed, and harvest crops, and to determine plant health prior to stress impacting plant productivity are also being researched. Tissue culture technologies are being developed for use in management and propagation of crop plants. Though previous efforts have focussed on development of technologies required to operate a biomass production module for a CELSS, current efforts are expanding to include technologies required to operate modules such as food preparation, biomass processing, and resource (waste) recovery which are integral parts of the CELSS.
Built But Not Used, Needed But Not Built: Ground System Guidance Based On Cassini-Huygens Experience
NASA Technical Reports Server (NTRS)
Larsen, Barbara S.
2006-01-01
These reflections share insight gleaned from Cassini-Huygens experience in supporting uplink operations tasks with software. Of particular interest are developed applications that were not widely adopted and tasks for which the appropriate application was not planned. After several years of operations, tasks are better understood providing a clearer picture of the mapping of requirements to applications. The impact on system design of the changing user profile due to distributed operations and greater participation of scientists in operations is also explored. Suggestions are made for improving the architecture, requirements, and design of future systems for uplink operations.
EG&G Florida, Inc., KSC base operations contractor Launch Readiness Assessment System
NASA Technical Reports Server (NTRS)
Geaslen, W. D.
1988-01-01
A computerized Launch Readiness Assessment System (LRAS) which compares 'current status' of readiness against the 'required status' of readiness for the Space Shuttle. The five subsystems of the LRAS are examined in detail. The LRAS Plan specifies the overall system requirements, procedures, and reports. The LRAS Manager drives the operation of the LRAS system. The Responding Units (RU) maintain support plans and procedures which specify the detail requirements for each mission or milestone. The Master Data Tables contain the milestone, responsible RU relationships, and requirements assessment categories. The LRAS Status System serves as the launch readiness assessment reporting system. The relationships between these subsystems are displayed in diagrams.
Space Transportation System Availability Relationships to Life Cycle Cost
NASA Technical Reports Server (NTRS)
Rhodes, Russel E.; Donahue, Benjamin B.; Chen, Timothy T.
2009-01-01
Future space transportation architectures and designs must be affordable. Consequently, their Life Cycle Cost (LCC) must be controlled. For the LCC to be controlled, it is necessary to identify all the requirements and elements of the architecture at the beginning of the concept phase. Controlling LCC requires the establishment of the major operational cost drivers. Two of these major cost drivers are reliability and maintainability, in other words, the system's availability (responsiveness). Potential reasons that may drive the inherent availability requirement are the need to control the number of unique parts and the spare parts required to support the transportation system's operation. For more typical space transportation systems used to place satellites in space, the productivity of the system will drive the launch cost. This system productivity is the resultant output of the system availability. Availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. Since many operational factors cannot be projected early in the definition phase, the focus will be on inherent availability which is equal to the mean time between a failure (MTBF) divided by the MTBF plus the mean time to repair (MTTR) the system. The MTBF is a function of reliability or the expected frequency of failures. When the system experiences failures the result is added operational flow time, parts consumption, and increased labor with an impact to responsiveness resulting in increased LCC. The other function of availability is the MTTR, or maintainability. In other words, how accessible is the failed hardware that requires replacement and what operational functions are required before and after change-out to make the system operable. This paper will describe how the MTTR can be equated to additional labor, additional operational flow time, and additional structural access capability, all of which drive up the LCC. A methodology will be presented that provides the decision makers with the understanding necessary to place constraints on the design definition. This methodology for the major drivers will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system. This methodology will focus on the achievement of an affordable, responsive space transportation system. It is the intent of this paper to not only provide the visibility of the relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also to provide the capability to bound the variables, thus providing the insight required to control the system's engineering solution. An example of this visibility is the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also, selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement, or require accepting a larger parts count with the resulting higher individual part reliability requirements. This paper will provide an understanding of the relationship of mean repair time (mean downtime) to maintainability (accessibility for repair), and both mean time between failure (reliability of hardware) and the system inherent availability.
40 CFR 63.11583 - What are my monitoring requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... preparation operation are in target HAP service: (a) Operate a bag leak detection system with alarm that will alert operators of a leak in the control device filter material. If a bag leak detection system with... install, calibrate, operate, and maintain each bag leak detection system and alarm according to...
76 FR 64788 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Model 4101 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-19
... ``Certification Maintenance Requirements'', and, --05-10-30 ``Critical Design Configuration Control Limitations... Limitations''; 05-10-20, ``Certification Maintenance Requirements''; and 05-10-30, ``Critical Design... BAE Systems (Operations) Limited Jetstream Series 4100 AMM, Revision 35, dated February 15, 2011. We...
Research Perspectives for Material Requirements Planning Systems. Paper No. 434.
ERIC Educational Resources Information Center
Berry, W. L.; Whybark, D. Clay
Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…
Transport systems research vehicle color display system operations manual
NASA Technical Reports Server (NTRS)
Easley, Wesley C.; Johnson, Larry E.
1989-01-01
A recent upgrade of the Transport Systems Research Vehicle operated by the Advanced Transport Operating Systems Program Office at the NASA Langley Research Center has resulted in an all-glass panel in the research flight deck. Eight ARINC-D size CRT color displays make up the panel. A major goal of the display upgrade effort was ease of operation and maintenance of the hardware while maintaining versatility needed for flight research. Software is the key to this required versatility and will be the area demanding the most detailed technical design expertise. This document is is intended to serve as a single source of quick reference information needed for routine operation and system level maintenance. Detailed maintenance and modification of the display system will require specific design documentation and must be accomplished by individuals with specialized knowledge and experience.
40 CFR 65.84 - Operating requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) CONSOLIDATED FEDERAL AIR RULE Transfer Racks § 65.84 Operating requirements. (a) Closed vent systems or process piping. An owner or operator of a transfer rack shall operate it in such a manner that emissions are... per square inch). (d) Pressure relief device. The owner or operator of a transfer rack subject to the...
14 CFR 135.105 - Exception to second in command requirement: Approval for use of autopilot system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Exception to second in command requirement... PERSONS ON BOARD SUCH AIRCRAFT Flight Operations § 135.105 Exception to second in command requirement... second in command, if it is equipped with an operative approved autopilot system and the use of that...
14 CFR 135.105 - Exception to second in command requirement: Approval for use of autopilot system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Exception to second in command requirement... PERSONS ON BOARD SUCH AIRCRAFT Flight Operations § 135.105 Exception to second in command requirement... second in command, if it is equipped with an operative approved autopilot system and the use of that...
14 CFR 135.105 - Exception to second in command requirement: Approval for use of autopilot system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Exception to second in command requirement... PERSONS ON BOARD SUCH AIRCRAFT Flight Operations § 135.105 Exception to second in command requirement... second in command, if it is equipped with an operative approved autopilot system and the use of that...
14 CFR 135.105 - Exception to second in command requirement: Approval for use of autopilot system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Exception to second in command requirement... PERSONS ON BOARD SUCH AIRCRAFT Flight Operations § 135.105 Exception to second in command requirement... second in command, if it is equipped with an operative approved autopilot system and the use of that...
14 CFR 135.105 - Exception to second in command requirement: Approval for use of autopilot system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Exception to second in command requirement... PERSONS ON BOARD SUCH AIRCRAFT Flight Operations § 135.105 Exception to second in command requirement... second in command, if it is equipped with an operative approved autopilot system and the use of that...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...
Design and operation of a solar heating and cooling system for a residential size building
NASA Technical Reports Server (NTRS)
Littles, J. W.; Humphries, W. R.; Cody, J. C.
1978-01-01
The first year of operation of solar house is discussed. Selected design information, together with a brief system description is included. The house was equipped with an integrated solar heating and cooling system which uses fully automated state-of-the art. Evaluation of the data indicate that the solar house heating and cooling system is capable of supplying nearly 100 percent of the thermal energy required for heating and approximately 50 percent of the thermal energy required to operate the absorption cycle air conditioner.
40 CFR 63.11221 - How do I monitor and collect data to demonstrate continuous compliance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... malfunctions or out-of-control periods, or required monitoring system quality assurance or control activities... collect data according to this section. (b) You must operate the monitoring system and collect data at all required intervals at all times the affected source is operating except for periods of monitoring system...
40 CFR 63.11221 - How do I monitor and collect data to demonstrate continuous compliance?
Code of Federal Regulations, 2011 CFR
2011-07-01
... malfunctions or out-of-control periods, or required monitoring system quality assurance or control activities... collect data according to this section. (b) You must operate the monitoring system and collect data at all required intervals at all times the affected source is operating except for periods of monitoring system...
ERIC Educational Resources Information Center
Semple, Clarence A.; And Others
Functional requirements for a highly automated, flexible, instructional support system for aircrew training simulators are presented. Automated support modes and associated features and capabilities are described, along with hardware and software functional requirements for implementing a baseline system in an operational flight training context.…
Human factors issues in telerobotic systems for Space Station Freedom servicing
NASA Technical Reports Server (NTRS)
Malone, Thomas B.; Permenter, Kathryn E.
1990-01-01
Requirements for Space Station Freedom servicing are described and the state-of-the-art for telerobotic system on-orbit servicing of spacecraft is defined. The projected requirements for the Space Station Flight Telerobotic Servicer (FTS) are identified. Finally, the human factors issues in telerobotic servicing are discussed. The human factors issues are basically three: the definition of the role of the human versus automation in system control; the identification of operator-device interface design requirements; and the requirements for development of an operator-machine interface simulation capability.
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Real-time automated failure analysis for on-orbit operations
NASA Technical Reports Server (NTRS)
Kirby, Sarah; Lauritsen, Janet; Pack, Ginger; Ha, Anhhoang; Jowers, Steven; Mcnenny, Robert; Truong, The; Dell, James
1993-01-01
A system which is to provide real-time failure analysis support to controllers at the NASA Johnson Space Center Control Center Complex (CCC) for both Space Station and Space Shuttle on-orbit operations is described. The system employs monitored systems' models of failure behavior and model evaluation algorithms which are domain-independent. These failure models are viewed as a stepping stone to more robust algorithms operating over models of intended function. The described system is designed to meet two sets of requirements. It must provide a useful failure analysis capability enhancement to the mission controller. It must satisfy CCC operational environment constraints such as cost, computer resource requirements, verification, and validation. The underlying technology and how it may be used to support operations is also discussed.
Shared mission operations concept
NASA Technical Reports Server (NTRS)
Spradlin, Gary L.; Rudd, Richard P.; Linick, Susan H.
1994-01-01
Historically, new JPL flight projects have developed a Mission Operations System (MOS) as unique as their spacecraft, and have utilized a mission-dedicated staff to monitor and control the spacecraft through the MOS. NASA budgetary pressures to reduce mission operations costs have led to the development and reliance on multimission ground system capabilities. The use of these multimission capabilities has not eliminated an ongoing requirement for a nucleus of personnel familiar with a given spacecraft and its mission to perform mission-dedicated operations. The high cost of skilled personnel required to support projects with diverse mission objectives has the potential for significant reduction through shared mission operations among mission-compatible projects. Shared mission operations are feasible if: (1) the missions do not conflict with one another in terms of peak activity periods, (2) a unique MOS is not required, and (3) there is sufficient similarity in the mission profiles so that greatly different skills would not be required to support each mission. This paper will further develop this shared mission operations concept. We will illustrate how a Discovery-class mission would enter a 'partner' relationship with the Voyager Project, and can minimize MOS development and operations costs by early and careful consideration of mission operations requirements.
Managing Information On Technical Requirements
NASA Technical Reports Server (NTRS)
Mauldin, Lemuel E., III; Hammond, Dana P.
1993-01-01
Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.
Section 508 Electronic Information Accessibility Requirements for Software Development
NASA Technical Reports Server (NTRS)
Ellis, Rebecca
2014-01-01
Section 508 Subpart B 1194.21 outlines requirements for operating system and software development in order to create a product that is accessible to users with various disabilities. This portion of Section 508 contains a variety of standards to enable those using assistive technology and with visual, hearing, cognitive and motor difficulties to access all information provided in software. The focus on requirements was limited to the Microsoft Windows® operating system as it is the predominant operating system used at this center. Compliance with this portion of the requirements can be obtained by integrating the requirements into the software development cycle early and by remediating issues in legacy software if possible. There are certain circumstances with software that may arise necessitating an exemption from these requirements, such as design or engineering software using dynamically changing graphics or numbers to convey information. These exceptions can be discussed with the Section 508 Coordinator and another method of accommodation used.
Vehicle management and mission planning systems with shuttle applications
NASA Technical Reports Server (NTRS)
1972-01-01
A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.
Code of Federal Regulations, 2010 CFR
2010-07-01
... required to give blind vendors priority in operating vending facilities? 102-74.50 Section 102-74.50 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL....50 Are Federal agencies required to give blind vendors priority in operating vending facilities? With...
A Cognitive System Model for Human/Automation Dynamics in Airspace Management
NASA Technical Reports Server (NTRS)
Corker, Kevin M.; Pisanich, Gregory; Lebacqz, J. Victor (Technical Monitor)
1997-01-01
NASA has initiated a significant thrust of research and development focused on providing the flight crew and air traffic managers automation aids to increase capacity in en route and terminal area operations through the use of flexible, more fuel-efficient routing, while improving the level of safety in commercial carrier operations. In that system development, definition of cognitive requirements for integrated multi-operator dynamic aiding systems is fundamental. In order to support that cognitive function definition, we have extended the Man Machine Integrated Design and Analysis System (MIDAS) to include representation of multiple cognitive agents (both human operators and intelligent aiding systems) operating aircraft, airline operations centers and air traffic control centers in the evolving airspace. The demands of this application require representation of many intelligent agents sharing world-models, and coordinating action/intention with cooperative scheduling of goals and actions in a potentially unpredictable world of operations. The MIDAS operator models have undergone significant development in order to understand the requirements for operator aiding and the impact of that aiding in the complex nondeterminate system of national airspace operations. The operator model's structure has been modified to include attention functions, action priority, and situation assessment. The cognitive function model has been expanded to include working memory operations including retrieval from long-term store, interference, visual-motor and verbal articulatory loop functions, and time-based losses. The operator's activity structures have been developed to include prioritization and interruption of multiple parallel activities among multiple operators, to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. The model's internal representation has been be modified so that multiple, autonomous sets of equipment will function in a scenario as the single equipment sets do now. In order to support the analysis requirements with multiple items of equipment, it is necessary for equipment to access the state of other equipment objects at initialization time (a radar object may need to access the position and speed of aircraft in its area, for example), and as a function of perception and sensor system interaction. The model has been improved to include multiple world-states as a function of equipment am operator interaction. The model has been used -1o predict the impact of warning and alert zones in aircraft operation, and, more critic-ally, the interaction of flight-deck based warning mechanisms and air traffic controller action in response to ground-based conflict prediction and alerting systems. In this operation, two operating systems provide alerting to two autonomous, but linked sets of operators, whose view of the system and whose dynamics in response are radically different. System stability and operator action was predicted using the MIDAS model.
Space Station - An integrated approach to operational logistics support
NASA Technical Reports Server (NTRS)
Hosmer, G. J.
1986-01-01
Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.
Methodology for the systems engineering process. Volume 3: Operational availability
NASA Technical Reports Server (NTRS)
Nelson, J. H.
1972-01-01
A detailed description and explanation of the operational availability parameter is presented. The fundamental mathematical basis for operational availability is developed, and its relationship to a system's overall performance effectiveness is illustrated within the context of identifying specific availability requirements. Thus, in attempting to provide a general methodology for treating both hypothetical and existing availability requirements, the concept of an availability state, in conjunction with the more conventional probability-time capability, is investigated. In this respect, emphasis is focused upon a balanced analytical and pragmatic treatment of operational availability within the system design process. For example, several applications of operational availability to typical aerospace systems are presented, encompassing the techniques of Monte Carlo simulation, system performance availability trade-off studies, analytical modeling of specific scenarios, as well as the determination of launch-on-time probabilities. Finally, an extensive bibliography is provided to indicate further levels of depth and detail of the operational availability parameter.
NASA Technical Reports Server (NTRS)
Prinzel, Lawrence J., III; Kramer, Lynda J.; Bailey, Randall E.
2007-01-01
The use of enhanced vision systems in civil aircraft is projected to increase rapidly as the Federal Aviation Administration recently changed the aircraft operating rules under Part 91, revising the flight visibility requirements for conducting approach and landing operations. Operators conducting straight-in instrument approach procedures may now operate below the published approach minimums when using an approved enhanced flight vision system that shows the required visual references on the pilot's Head-Up Display. An experiment was conducted to evaluate the complementary use of synthetic vision systems and enhanced vision system technologies, focusing on new techniques for integration and/or fusion of synthetic and enhanced vision technologies and crew resource management while operating under these newly adopted rules. Experimental results specific to flight crew response to non-normal events using the fused synthetic/enhanced vision system are presented.
Study on the Preliminary Design of ARGO-M Operation System
NASA Astrophysics Data System (ADS)
Seo, Yoon-Kyung; Lim, Hyung-Chul; Rew, Dong-Young; Jo, Jung Hyun; Park, Jong-Uk; Park, Eun-Seo; Park, Jang-Hyun
2010-12-01
Korea Astronomy and Space Science Institute has been developing one mobile satellite laser ranging system named as accurate ranging system for geodetic observation-mobile (ARGO-M). Preliminary design of ARGO-M operation system (AOS) which is one of the ARGO-M subsystems was completed in 2009. Preliminary design results are applied to the following development phase by performing detailed design with analysis of pre-defined requirements and analysis of the derived specifications. This paper addresses the preliminary design of the whole AOS. The design results in operation and control part which is a key part in the operation system are described in detail. Analysis results of the interface between operation-supporting hardware and the control computer are summarized, which is necessary in defining the requirements for the operation-supporting hardware. Results of this study are expected to be used in the critical design phase to finalize the design process.
30 CFR 250.803 - Additional production system requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... pressure vessels at any time when there is a change in operating pressures that requires new settings for... significant change in operating pressures. The most recent pressure-recorder charts used to determine... subfreezing climates, the lessee shall furnish evidence to the District Manager that the firefighting system...
30 CFR 250.803 - Additional production system requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... pressure vessels at any time when there is a change in operating pressures that requires new settings for... significant change in operating pressures. The most recent pressure-recorder charts used to determine... subfreezing climates, the lessee shall furnish evidence to the District Manager that the firefighting system...
30 CFR 250.803 - Additional production system requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... pressure vessels at any time when there is a change in operating pressures that requires new settings for... significant change in operating pressures. The most recent pressure-recorder charts used to determine... subfreezing climates, the lessee shall furnish evidence to the District Manager that the firefighting system...
29 CFR 1910.217 - Mechanical power presses.
Code of Federal Regulations, 2012 CFR
2012-07-01
... against unintentional operation and have the individual operator's hand controls arranged by design and... trip the press. (b) The control system shall be designed to permit an adjustment which will require... shall incorporate an antirepeat feature. (d) The control systems shall be designed to require release of...
29 CFR 1910.217 - Mechanical power presses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... against unintentional operation and have the individual operator's hand controls arranged by design and... trip the press. (b) The control system shall be designed to permit an adjustment which will require... shall incorporate an antirepeat feature. (d) The control systems shall be designed to require release of...
29 CFR 1910.217 - Mechanical power presses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... against unintentional operation and have the individual operator's hand controls arranged by design and... trip the press. (b) The control system shall be designed to permit an adjustment which will require... shall incorporate an antirepeat feature. (d) The control systems shall be designed to require release of...
29 CFR 1910.217 - Mechanical power presses.
Code of Federal Regulations, 2014 CFR
2014-07-01
... against unintentional operation and have the individual operator's hand controls arranged by design and... trip the press. (b) The control system shall be designed to permit an adjustment which will require... shall incorporate an antirepeat feature. (d) The control systems shall be designed to require release of...
78 FR 14654 - Standards for Business Practices and Communication Protocols for Public Utilities
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-07
... also require each regional transmission organization (RTO) and independent system operator (ISO) to... 20426, (202) 502-6404. Mindi Sauter (legal issues), Office of the General Counsel, Federal Energy... require each regional transmission organization (RTO) and independent system operator (ISO) to address in...
29 CFR 1910.217 - Mechanical power presses.
Code of Federal Regulations, 2013 CFR
2013-07-01
... against unintentional operation and have the individual operator's hand controls arranged by design and... trip the press. (b) The control system shall be designed to permit an adjustment which will require... shall incorporate an antirepeat feature. (d) The control systems shall be designed to require release of...
75 FR 58014 - Pipeline Safety: Information Collection Activity; Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... detection systems must comply with the standards set out in American Petroleum Institute (API) publication API 1130. API 1130 requires operators to record and retain certain information regarding the operation and testing of CPM systems. Compliance with API 1130, including its recordkeeping requirements...
30 CFR 780.10 - Information collection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.10... activities, including a requirement that the application include an operation and reclamation plan. The...
40 CFR 63.1085 - What are the general requirements for heat exchange systems?
Code of Federal Regulations, 2011 CFR
2011-07-01
... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...
40 CFR 63.1085 - What are the general requirements for heat exchange systems?
Code of Federal Regulations, 2013 CFR
2013-07-01
... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...
40 CFR 63.1085 - What are the general requirements for heat exchange systems?
Code of Federal Regulations, 2014 CFR
2014-07-01
... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...
40 CFR 63.1085 - What are the general requirements for heat exchange systems?
Code of Federal Regulations, 2012 CFR
2012-07-01
... heat exchange systems? 63.1085 Section 63.1085 Protection of Environment ENVIRONMENTAL PROTECTION... Exchange Systems and Waste Operations Heat Exchange System Requirements § 63.1085 What are the general requirements for heat exchange systems? Unless you meet one of the requirements for exemptions in § 63.1084...
Achieving Operability via the Mission System Paradigm
NASA Technical Reports Server (NTRS)
Hammer, Fred J.; Kahr, Joseph R.
2006-01-01
In the past, flight and ground systems have been developed largely-independently, with the flight system taking the lead, and dominating the development process. Operability issues have been addressed poorly in planning, requirements, design, I&T, and system-contracting activities. In many cases, as documented in lessons-learned, this has resulted in significant avoidable increases in cost and risk. With complex missions and systems, operability is being recognized as an important end-to-end design issue. Never-the-less, lessons-learned and operability concepts remain, in many cases, poorly understood and sporadically applied. A key to effective application of operability concepts is adopting a 'mission system' paradigm. In this paradigm, flight and ground systems are treated, from an engineering and management perspective, as inter-related elements of a larger mission system. The mission system consists of flight hardware, flight software, telecom services, ground data system, testbeds, flight teams, science teams, flight operations processes, procedures, and facilities. The system is designed in functional layers, which span flight and ground. It is designed in response to project-level requirements, mission design and an operations concept, and is developed incrementally, with early and frequent integration of flight and ground components.
Advanced EVA system design requirements study, executive summary
NASA Technical Reports Server (NTRS)
1986-01-01
Design requirements and criteria for the space station advanced Extravehicular Activity System (EVAS) including crew enclosures, portable life support systems, maneuvering propulsion systems, and related EVA support equipment were established. The EVA mission requirements, environments, and medical and physiological requirements, as well as operational, procedures and training issues were considered.
49 CFR 192.913 - When may an operator deviate its program from certain requirements of this subpart?
Code of Federal Regulations, 2011 CFR
2011-10-01
... management program. An operator that uses a performance-based approach that satisfies the requirements for... to demonstrate the exceptional performance of its integrity management program through the following... to the operator's pipeline system and to the operator's integrity management program; (vi) A...
On-Orbit Propulsion System Performance of ISS Visiting Vehicles
NASA Technical Reports Server (NTRS)
Martin, Mary Regina M.; Swanson, Robert A.; Kamath, Ulhas P.; Hernandez, Francisco J.; Spencer, Victor
2013-01-01
The International Space Station (ISS) represents the culmination of over two decades of unprecedented global human endeavors to conceive, design, build and operate a research laboratory in space. Uninterrupted human presence in space since the inception of the ISS has been made possible by an international fleet of space vehicles facilitating crew rotation, delivery of science experiments and replenishment of propellants and supplies. On-orbit propulsion systems on both ISS and Visiting Vehicles are essential to the continuous operation of the ISS. This paper compares the ISS visiting vehicle propulsion systems by providing an overview of key design drivers, operational considerations and performance characteristics. Despite their differences in design, functionality, and purpose, all visiting vehicles must adhere to a common set of interface requirements along with safety and operational requirements. This paper addresses a wide variety of methods for satisfying these requirements and mitigating credible hazards anticipated during the on-orbit life of propulsion systems, as well as the seamless integration necessary for the continued operation of the ISS.
Civilian Radioactive Waste Management System Requirements Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
C.A. Kouts
2006-05-10
The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
Tug fleet and ground operations schedules and controls. Volume 2: part 1
NASA Technical Reports Server (NTRS)
1975-01-01
This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
Code of Federal Regulations, 2011 CFR
2011-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...
Code of Federal Regulations, 2010 CFR
2010-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, G.A.
1998-03-11
This document defines the requirements applicable to the operation, maintenance and storage of the Supervisory Control and Data Acquisition System (SCADAS) and Control Network in support of the Light Duty Utility Arm (LDUA) operations.
A Greenhouse-Gas Information System: Monitoring and Validating Emissions Reporting and Mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jonietz, Karl K.; Dimotakis, Paul E.; Rotman, Douglas A.
2011-09-26
This study and report focus on attributes of a greenhouse-gas information system (GHGIS) needed to support MRV&V needs. These needs set the function of such a system apart from scientific/research monitoring of GHGs and carbon-cycle systems, and include (not exclusively): the need for a GHGIS that is operational, as required for decision-support; the need for a system that meets specifications derived from imposed requirements; the need for rigorous calibration, verification, and validation (CV&V) standards, processes, and records for all measurement and modeling/data-inversion data; the need to develop and adopt an uncertainty-quantification (UQ) regimen for all measurement and modeling data; andmore » the requirement that GHGIS products can be subjected to third-party questioning and scientific scrutiny. This report examines and assesses presently available capabilities that could contribute to a future GHGIS. These capabilities include sensors and measurement technologies; data analysis and data uncertainty quantification (UQ) practices and methods; and model-based data-inversion practices, methods, and their associated UQ. The report further examines the need for traceable calibration, verification, and validation processes and attached metadata; differences between present science-/research-oriented needs and those that would be required for an operational GHGIS; the development, operation, and maintenance of a GHGIS missions-operations center (GMOC); and the complex systems engineering and integration that would be required to develop, operate, and evolve a future GHGIS.« less
NASA Astrophysics Data System (ADS)
Stomski, Paul J., Jr.; Campbell, Randy; McCann, Kevin; Shimko, Steve
2010-07-01
W. M. Keck Observatory (WMKO) routinely operates laser guide star (LGS) Adaptive Optics (AO) systems at the telescope facility on the Big Island of Hawaii. One of the operational requirements for the LGS system is that a safety system to prevent nearby aircraft from being adversely affected by the laser must be provided. We will support operations in the near term with human aircraft spotters until we can successfully develop and get the appropriate approvals needed for an Automated, Integrated and Reliable System for an Aircraft Friendly Environment (AIRSAFE). This report describes some of the preliminary requirements development work at WMKO in support of the future development of AIRSAFE. We discuss the results of recent work to characterize site specific considerations that impact requirements development. The site specific considerations include the proximity of WMKO laser operations to nearby commercial airports, the implications of military operations in the area and the character of the air traffic volume and flight patterns over the telescope facility. Finally, we discuss how the design and implementation of AIRSAFE will be impacted by these site specific considerations.
46 CFR 111.97-7 - Distribution.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...
46 CFR 111.97-7 - Distribution.
Code of Federal Regulations, 2011 CFR
2011-10-01
... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...
46 CFR 111.97-7 - Distribution.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...
46 CFR 111.97-7 - Distribution.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...
46 CFR 111.97-7 - Distribution.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...
DOT National Transportation Integrated Search
2010-02-01
Transit Operations Decision Support Systems (TODSS) are systems designed to support dispatchers and others in real-time operations : management in response to incidents, special events, and other changing conditions. As part of a joint Federal Transi...
The 30/20 GHz communications system functional requirements
NASA Technical Reports Server (NTRS)
Siperko, C. M.; Frankfort, M.; Markham, R.; Wall, M.
1981-01-01
The characteristics of 30/20 GHz usage in satellite systems to be used in support of projected communication requirements of the 1990's are defined. A requirements analysis which develops projected market demand for satellite services by general and specialized carriers and an analysis of the impact of propagation and system constraints on 30/20 GHz operation are included. A set of technical performance characteristics for the 30/20 GHz systems which can serve the resulting market demand and the experimental program necessary to verify technical and operational aspects of the proposed systems is also discussed.
NASA Technical Reports Server (NTRS)
Milne, R.
1995-01-01
This paper examines the vehicle antenna requirements for mobile satellite systems. The antenna parameters are discussed in the light of the requirements and the limitations in performance imposed by the physical constraints of antenna and by vehicle geometries. Measurements of diffraction and antenna noise temperature in an operational environment are examined, as well as their effects on system margins. Mechanical versus electronic designs are compared with regards to performance, cost, reliability, and design complexity. Comparisons between open-loop and close-loop tracking systems are made and the effects of bandwidth, sidelobe levels, operational constraints, vehicle angular velocity, and acceleration are discussed. Some consideration is given to the use of hybrid systems employing both open and closed-loop tracking. Changes to antenna/terminal specifications are recommended which will provide greater design flexibility and increase the likelihood of meeting the performance and operational requirements.
NASA Technical Reports Server (NTRS)
Rasmussen, Robert; Bennett, Matthew
2006-01-01
The State Analysis Database Tool software establishes a productive environment for collaboration among software and system engineers engaged in the development of complex interacting systems. The tool embodies State Analysis, a model-based system engineering methodology founded on a state-based control architecture (see figure). A state represents a momentary condition of an evolving system, and a model may describe how a state evolves and is affected by other states. The State Analysis methodology is a process for capturing system and software requirements in the form of explicit models and states, and defining goal-based operational plans consistent with the models. Requirements, models, and operational concerns have traditionally been documented in a variety of system engineering artifacts that address different aspects of a mission s lifecycle. In State Analysis, requirements, models, and operations information are State Analysis artifacts that are consistent and stored in a State Analysis Database. The tool includes a back-end database, a multi-platform front-end client, and Web-based administrative functions. The tool is structured to prompt an engineer to follow the State Analysis methodology, to encourage state discovery and model description, and to make software requirements and operations plans consistent with model descriptions.
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...
40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...
49 CFR 232.109 - Dynamic brake requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... system that includes dynamic brakes shall adopt and comply with written operating rules governing safe... verifiable data and research. (k) A railroad operating a train with a brake system that includes dynamic... 49 Transportation 4 2010-10-01 2010-10-01 false Dynamic brake requirements. 232.109 Section 232...
Sortie laboratory, phase B technical summary. [design and operational requirements
NASA Technical Reports Server (NTRS)
1973-01-01
The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.
Air Force IT System Security Compliance with Law and Policy
2016-04-01
production /1/saf_cio_a6/publication/afpd33-2/afpd33-2.pdf 21 AFI33-210, Air Force Certification and Accreditation Program (AFCAP), October 2014: http...cyber systems for support and operation. Today’s system certification and compliancy tracking methods are very costly, time intensive, unrealistic...and often lag behind operational and test requirements. However, with changes to policy and implementation requirements, the IT system certification
30 CFR 784.10 - Information collection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.10... requires applicants for permits for underground coal mines to prepare and submit an operation and...
40 CFR 264.194 - General operating requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
....194 Section 264.194 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Tank Systems § 264.194 General operating requirements. (a) Hazardous wastes or treatment reagents must...
Navigation Operations for the Magnetospheric Multiscale Mission
NASA Technical Reports Server (NTRS)
Long, Anne; Farahmand, Mitra; Carpenter, Russell
2015-01-01
The Magnetospheric Multiscale (MMS) mission employs four identical spinning spacecraft flying in highly elliptical Earth orbits. These spacecraft will fly in a series of tetrahedral formations with separations of less than 10 km. MMS navigation operations use onboard navigation to satisfy the mission definitive orbit and time determination requirements and in addition to minimize operations cost and complexity. The onboard navigation subsystem consists of the Navigator GPS receiver with Goddard Enhanced Onboard Navigation System (GEONS) software, and an Ultra-Stable Oscillator. The four MMS spacecraft are operated from a single Mission Operations Center, which includes a Flight Dynamics Operations Area (FDOA) that supports MMS navigation operations, as well as maneuver planning, conjunction assessment and attitude ground operations. The System Manager component of the FDOA automates routine operations processes. The GEONS Ground Support System component of the FDOA provides the tools needed to support MMS navigation operations. This paper provides an overview of the MMS mission and associated navigation requirements and constraints and discusses MMS navigation operations and the associated MMS ground system components built to support navigation-related operations.
A hierarchical modeling methodology for the definition and selection of requirements
NASA Astrophysics Data System (ADS)
Dufresne, Stephane
This dissertation describes the development of a requirements analysis methodology that takes into account the concept of operations and the hierarchical decomposition of aerospace systems. At the core of the methodology, the Analytic Network Process (ANP) is used to ensure the traceability between the qualitative and quantitative information present in the hierarchical model. The proposed methodology is implemented to the requirements definition of a hurricane tracker Unmanned Aerial Vehicle. Three research objectives are identified in this work; (1) improve the requirements mapping process by matching the stakeholder expectations with the concept of operations, systems and available resources; (2) reduce the epistemic uncertainty surrounding the requirements and requirements mapping; and (3) improve the requirements down-selection process by taking into account the level of importance of the criteria and the available resources. Several challenges are associated with the identification and definition of requirements. The complexity of the system implies that a large number of requirements are needed to define the systems. These requirements are defined early in the conceptual design, where the level of knowledge is relatively low and the level of uncertainty is large. The proposed methodology intends to increase the level of knowledge and reduce the level of uncertainty by guiding the design team through a structured process. To address these challenges, a new methodology is created to flow-down the requirements from the stakeholder expectations to the systems alternatives. A taxonomy of requirements is created to classify the information gathered during the problem definition. Subsequently, the operational and systems functions and measures of effectiveness are integrated to a hierarchical model to allow the traceability of the information. Monte Carlo methods are used to evaluate the variations of the hierarchical model elements and consequently reduce the epistemic uncertainty. The proposed methodology is applied to the design of a hurricane tracker Unmanned Aerial Vehicles to demonstrate the origin and impact of requirements on the concept of operations and systems alternatives. This research demonstrates that the hierarchical modeling methodology provides a traceable flow-down of the requirements from the problem definition to the systems alternatives phases of conceptual design.
Feasibility study of a real-time operating system for a multichannel MPEG-4 encoder
NASA Astrophysics Data System (ADS)
Lehtoranta, Olli; Hamalainen, Timo D.
2005-03-01
Feasibility of DSP/BIOS real-time operating system for a multi-channel MPEG-4 encoder is studied. Performances of two MPEG-4 encoder implementations with and without the operating system are compared in terms of encoding frame rate and memory requirements. The effects of task switching frequency and number of parallel video channels to the encoding frame rate are measured. The research is carried out on a 200 MHz TMS320C6201 fixed point DSP using QCIF (176x144 pixels) video format. Compared to a traditional DSP implementation without an operating system, inclusion of DSP/BIOS reduces total system throughput only by 1 QCIF frames/s. The operating system has 6 KB data memory overhead and program memory requirement of 15.7 KB. Hence, the overhead is considered low enough for resource critical mobile video applications.
A new bipolar Qtrim power supply system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mi, C.; Bruno, D.; Drozd, J.
2015-05-03
This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.
NASA Technical Reports Server (NTRS)
Buden, D.
1991-01-01
Topics dealing with nuclear safety are addressed which include the following: general safety requirements; safety design requirements; terrestrial safety; SP-100 Flight System key safety requirements; potential mission accidents and hazards; key safety features; ground operations; launch operations; flight operations; disposal; safety concerns; licensing; the nuclear engine for rocket vehicle application (NERVA) design philosophy; the NERVA flight safety program; and the NERVA safety plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for equipment, instruments, and controls? 111.117 Section 111.117 Food and Drugs FOOD AND DRUG ADMINISTRATION... and Process Control System: Requirements for Quality Control § 111.117 What quality control operations...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik
2015-10-19
The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variabilitymore » in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.« less
Surface Nuclear Power for Human Mars Missions
NASA Technical Reports Server (NTRS)
Mason, Lee S.
1999-01-01
The Design Reference Mission for NASA's human mission to Mars indicates the desire for in-situ propellant production and bio-regenerative life systems to ease Earth launch requirements. These operations, combined with crew habitation and science, result in surface power requirements approaching 160 kilowatts. The power system, delivered on an early cargo mission, must be deployed and operational prior to crew departure from Earth. The most mass efficient means of satisfying these requirements is through the use of nuclear power. Studies have been performed to identify a potential system concept using a mobile cart to transport the power system away from the Mars lander and provide adequate separation between the reactor and crew. The studies included an assessment of reactor and power conversion technology options, selection of system and component redundancy, determination of optimum separation distance, and system performance sensitivity to some key operating parameters. The resulting system satisfies the key mission requirements including autonomous deployment, high reliability, and cost effectiveness at a overall system mass of 12 tonnes and a stowed volume of about 63 cu m.
Hughes, Douglas A.
2006-04-04
A method and system are provided for determining the torque required to launch a vehicle having a hybrid drive-train that includes at least two independently operable prime movers. The method includes the steps of determining the value of at least one control parameter indicative of a vehicle operating condition, determining the torque required to launch the vehicle from the at least one determined control parameter, comparing the torque available from the prime movers to the torque required to launch the vehicle, and controlling operation of the prime movers to launch the vehicle in response to the comparing step. The system of the present invention includes a control unit configured to perform the steps of the method outlined above.
Self-regulating control of parasitic loads in a fuel cell power system
NASA Technical Reports Server (NTRS)
Vasquez, Arturo (Inventor)
2011-01-01
A fuel cell power system comprises an internal or self-regulating control of a system or device requiring a parasitic load. The internal or self-regulating control utilizes certain components and an interconnection scheme to produce a desirable, variable voltage potential (i.e., power) to a system or device requiring parasitic load in response to varying operating conditions or requirements of an external load that is connected to a primary fuel cell stack of the system. Other embodiments comprise a method of designing such a self-regulated control scheme and a method of operating such a fuel cell power system.
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... characteristics requirements is dependent upon a stability augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25.671 and 25.672. (f) In meeting the... ice protection system in accordance with the operating limitations and operating procedures...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 4: OEPSS design concepts
NASA Technical Reports Server (NTRS)
Wong, George S.; Ziese, James M.; Farhangi, Shahram
1990-01-01
This study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the OEPSS study have been organized into a series of OEPSS Data Books. This volume describes three propulsion concepts that will simplify the propulsion system design and significantly reduce operational requirements. The concepts include: (1) a fully integrated, booster propulsion module concept for the ALS that avoids the complex system created by using autonomous engines with numerous artificial interfaces; (2) an LOX tank aft concept which avoids potentially dangerous geysering in long LOX propellant lines; and (3) an air augmented, rocket engine nozzle afterburning propulsion concept that will significantly reduce LOX propellant requirements, reduce vehicle size and simplify ground operations and ground support equipment and facilities.
A Ground Systems Template for Remote Sensing Systems
NASA Astrophysics Data System (ADS)
McClanahan, Timothy P.; Trombka, Jacob I.; Floyd, Samuel R.; Truskowski, Walter; Starr, Richard D.; Clark, Pamela E.; Evans, Larry G.
2002-10-01
Spaceborne remote sensing using gamma and X-ray spectrometers requires particular attention to the design and development of reliable systems. These systems must ensure the scientific requirements of the mission within the challenging technical constraints of operating instrumentation in space. The Near Earth Asteroid Rendezvous (NEAR) spacecraft included X-ray and gamma-ray spectrometers (XGRS), whose mission was to map the elemental chemistry of the 433 Eros asteroid. A remote sensing system template, similar to a blackboard systems approach used in artificial intelligence, was identified in which the spacecraft, instrument, and ground system was designed and developed to monitor and adapt to evolving mission requirements in a complicated operational setting. Systems were developed for ground tracking of instrument calibration, instrument health, data quality, orbital geometry, solar flux as well as models of the asteroid's surface characteristics, requiring an intensive human effort. In the future, missions such as the Autonomous Nano-Technology Swarm (ANTS) program will have to rely heavily on automation to collectively encounter and sample asteroids in the outer asteroid belt. Using similar instrumentation, ANTS will require information similar to data collected by the NEAR X-ray/Gamma-Ray Spectrometer (XGRS) ground system for science and operations management. The NEAR XGRS systems will be studied to identify the equivalent subsystems that may be automated for ANTS. The effort will also investigate the possibility of applying blackboard style approaches to automated decision making required for ANTS.
The Aerospace Energy Systems Laboratory: A BITBUS networking application
NASA Technical Reports Server (NTRS)
Glover, Richard D.; Oneill-Rood, Nora
1989-01-01
The NASA Ames-Dryden Flight Research Facility developed a computerized aircraft battery servicing facility called the Aerospace Energy Systems Laboratory (AESL). This system employs distributed processing with communications provided by a 2.4-megabit BITBUS local area network. Customized handlers provide real time status, remote command, and file transfer protocols between a central system running the iRMX-II operating system and ten slave stations running the iRMX-I operating system. The hardware configuration and software components required to implement this BITBUS application are required.
77 FR 26356 - Petition for Waiver of Compliance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-03
... Order Procedures: Railroad Track, Locomotive and Equipment; 217, Railroad Operating Rules; 218, Railroad Operating Practices; 229, Railroad Locomotive Safety Standards; 233, Signal Systems Reporting Requirements... requiring special notice for repairs. Waiver is also sought for non-I-ETMS-equipped locomotives operating in...
NASA Technical Reports Server (NTRS)
1974-01-01
The functional, performance, and design requirements for the Operations Control Center (OCC) of the Earth Observatory Satellite (EOS) system are presented. The OCC controls the operations of the EOS satellite to acquire mission data consisting of: (1) thematic mapper data, (2) multispectral scanner data on EOS-A, or High Resolution Pointable Imager data on EOS-B, and (3) data collection system (DCS) data. The various inputs to the OCC are identified. The functional requirements of the OCC are defined. The specific systems and subsystems of the OCC are described and block diagrams are provided.
40 CFR 63.7710 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Operation... required by § 63.6(e)(1)(i), you must always operate and maintain your iron and steel foundry, including... defect or deficiency as soon as practicable. (2) Operating limits for each capture system for an...
40 CFR 63.7710 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Operation... required by § 63.6(e)(1)(i), you must always operate and maintain your iron and steel foundry, including... defect or deficiency as soon as practicable. (2) Operating limits for each capture system for an...
40 CFR 63.7710 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Operation... required by § 63.6(e)(1)(i), you must always operate and maintain your iron and steel foundry, including... defect or deficiency as soon as practicable. (2) Operating limits for each capture system for an...
40 CFR 63.7710 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Operation... required by § 63.6(e)(1)(i), you must always operate and maintain your iron and steel foundry, including... defect or deficiency as soon as practicable. (2) Operating limits for each capture system for an...
Integrated Vehicle Thermal Management for Advanced Vehicle Propulsion Technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bennion, K.; Thornton, M.
A critical element to the success of new propulsion technologies that enable reductions in fuel use is the integration of component thermal management technologies within a viable vehicle package. Vehicle operation requires vehicle thermal management systems capable of balancing the needs of multiple vehicle systems that may require heat for operation, require cooling to reject heat, or require operation within specified temperature ranges. As vehicle propulsion transitions away from a single form of vehicle propulsion based solely on conventional internal combustion engines (ICEs) toward a wider array of choices including more electrically dominant systems such as plug-in hybrid electric vehiclesmore » (PHEVs), new challenges arise associated with vehicle thermal management. As the number of components that require active thermal management increase, so do the costs in terms of dollars, weight, and size. Integrated vehicle thermal management is one pathway to address the cost, weight, and size challenges. The integration of the power electronics and electric machine (PEEM) thermal management with other existing vehicle systems is one path for reducing the cost of electric drive systems. This work demonstrates techniques for evaluating and quantifying the integrated transient and continuous heat loads of combined systems incorporating electric drive systems that operate primarily under transient duty cycles, but the approach can be extended to include additional steady-state duty cycles typical for designing vehicle thermal management systems of conventional vehicles. The work compares opportunities to create an integrated low temperature coolant loop combining the power electronics and electric machine with the air conditioning system in contrast to a high temperature system integrated with the ICE cooling system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pennock, Kenneth; Makarov, Yuri V.; Rajagopal, Sankaran
The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of suchmore » a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.« less
Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 3: Operations technology
NASA Technical Reports Server (NTRS)
Vilja, John O.
1990-01-01
The study was initiated to identify operational problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the OEPSS study were organized into a series of OEPSS Data Books. This volume describes operations technologies that will enhance operational efficiency of propulsion systems. A total of 15 operations technologies were identified that will eliminate or mitigate operations problems described in Volume 2. A recommended development plan is presented for eight promising technologies that will simplify the propulsion system and reduce operational requirements.
NASA Technical Reports Server (NTRS)
Kramer, Edward (Editor)
1998-01-01
The cryogenic fluid management technologies required for the exploration of the solar system can only be fully developed via space-based experiments. A dedicated spacecraft is the most efficient way to perform these experiments. This report documents the extended conceptual design of the COLD-SAT spacecraft, capable of meeting these experimental requirements. All elements, including the spacecraft, ground segment, launch site modifications and launch vehicle operations, and flight operations are included. Greatly expanded coverage is provided for those areas unique to this cryogenic spacecraft, such as the experiment system, attitude control system, and spacecraft operations. Supporting analyses are included as are testing requirements, facilities surveys, and proposed project timelines.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... regulations erroneously state that an operating system such as ``Windows 2007'' may be used; there is no such operating system so this system is removed. Corrections to Regulations Implemented as Part of the 2011-2012... follows: Sec. 660.15 Equipment requirements. * * * * * (d) * * * (1) * * * (v) Operating system: Microsoft...
Automatic Data Processing Equipment (ADPE) acquisition plan for the medical sciences
NASA Technical Reports Server (NTRS)
1979-01-01
An effective mechanism for meeting the SLSD/MSD data handling/processing requirements for Shuttle is discussed. The ability to meet these requirements depends upon the availability of a general purpose high speed digital computer system. This system is expected to implement those data base management and processing functions required across all SLSD/MSD programs during training, laboratory operations/analysis, simulations, mission operations, and post mission analysis/reporting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Capture Systems... 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits in the following table...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Operating Limits for Capture Systems... 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits in the following table...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...
NASA Technical Reports Server (NTRS)
West, R. S.
1975-01-01
The system is described as a computer-based system designed to track the status of problems and corrective actions pertinent to space shuttle hardware. The input, processing, output, and performance requirements of the system are presented along with standard display formats and examples. Operational requirements, hardware, requirements, and test requirements are also included.
Development of Optimal Stressor Scenarios for New Operational Energy Systems
2017-12-01
Analyzing the previous model using a design of experiments (DOE) and regression analysis provides critical information about the associated operational...from experimentation. The resulting system requirements can be used to revisit the design requirements and develop a more robust system. This process...stressor scenarios for acceptance testing. Analyzing the previous model using a design of experiments (DOE) and regression analysis provides critical
CFD Analysis of a Penta-hulled, Air-Entrapment, High-Speed Planning Vessel
2008-03-01
INTRODUCTION A. BACKGROUND The 2007 Total Ship Systems Engineering (TSSE) class was tasked with designing a new riverine craft or specialized...the concept of operations, for our defined system architecture (combined Specialized Command and Control Craft / Mobile Operating Base). This also...of an integration process that requires both systems and equipment optimization while meeting predetermined requirements set for by the Concept of
NASA Technical Reports Server (NTRS)
Rogers, Ralph V.
1992-01-01
This research project addresses the need to provide an efficient and safe mechanism to investigate the effects and requirements of the tiltrotor aircraft's commercial operations on air transportation infrastructures, particularly air traffic control. The mechanism of choice is computer simulation. Unfortunately, the fundamental paradigms of the current air traffic control simulation models do not directly support the broad range of operational options and environments necessary to study tiltrotor operations. Modification of current air traffic simulation models to meet these requirements does not appear viable given the range and complexity of issues needing resolution. As a result, the investigation of systemic, infrastructure issues surrounding the effects of tiltrotor commercial operations requires new approaches to simulation modeling. These models should be based on perspectives and ideas closer to those associated with tiltrotor air traffic operations.
Basic characteristics and realization of production system control
NASA Astrophysics Data System (ADS)
Cheng, Shaopeng; Shell, Richard; Hall, Ernest L.
1992-11-01
This paper analyzes the issues involved in developing an intelligent production control system. It describes the basic characteristics of a production control system and an effective design methodology to realize the production control functions. Petri net, subsystem and hierarchical control concepts are applied to a computer integrated material handling system (MHS). Some communication and interface requirements of the MHS are also considered in this paper. The control system solution is illustrated with an actual MHS operation case which indicates that a truly flexible and integrated production system can be realized with a Petri net operation model and a hierarchical control structure. The significance of this work is related to the different operation testing and evaluation requirements encountered in manufacturing.
Advanced engineering software for in-space assembly and manned planetary spacecraft
NASA Technical Reports Server (NTRS)
Delaquil, Donald; Mah, Robert
1990-01-01
Meeting the objectives of the Lunar/Mars initiative to establish safe and cost-effective extraterrestrial bases requires an integrated software/hardware approach to operational definitions and systems implementation. This paper begins this process by taking a 'software-first' approach to systems design, for implementing specific mission scenarios in the domains of in-space assembly and operations of the manned Mars spacecraft. The technological barriers facing implementation of robust operational systems within these two domains are discussed, and preliminary software requirements and architectures that resolve these barriers are provided.
Phase structure rewrite systems in information retrieval
NASA Technical Reports Server (NTRS)
Klingbiel, P. H.
1985-01-01
Operational level automatic indexing requires an efficient means of normalizing natural language phrases. Subject switching requires an efficient means of translating one set of authorized terms to another. A phrase structure rewrite system called a Lexical Dictionary is explained that performs these functions. Background, operational use, other applications and ongoing research are explained.
30 CFR 250.446 - What are the BOP maintenance and inspection requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.446 What are the... Prevention Equipment Systems for Drilling Wells (incorporated by reference as specified in § 250.198). You...
49 CFR 37.185 - Fleet accessibility requirement for OTRB fixed-route systems of large operators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Fleet accessibility requirement for OTRB fixed-route systems of large operators. 37.185 Section 37.185 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37...
Deep Space Network (DSN), Network Operations Control Center (NOCC) computer-human interfaces
NASA Technical Reports Server (NTRS)
Ellman, Alvin; Carlton, Magdi
1993-01-01
The Network Operations Control Center (NOCC) of the DSN is responsible for scheduling the resources of DSN, and monitoring all multi-mission spacecraft tracking activities in real-time. Operations performs this job with computer systems at JPL connected to over 100 computers at Goldstone, Australia and Spain. The old computer system became obsolete, and the first version of the new system was installed in 1991. Significant improvements for the computer-human interfaces became the dominant theme for the replacement project. Major issues required innovating problem solving. Among these issues were: How to present several thousand data elements on displays without overloading the operator? What is the best graphical representation of DSN end-to-end data flow? How to operate the system without memorizing mnemonics of hundreds of operator directives? Which computing environment will meet the competing performance requirements? This paper presents the technical challenges, engineering solutions, and results of the NOCC computer-human interface design.
A laser scanning system for metrology and viewing in ITER
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spampinato, P.T.; Barry, R.E.; Menon, M.M.
1996-05-01
The construction and operation of a next-generation fusion reactor will require metrology to achieve and verify precise alignment of plasma-facing components and inspection in the reactor vessel. The system must be compatible with the vessel environment of high gamma radiation (10{sup 4} Gy/h), ultra-high-vacuum (10{sup {minus}8} torr), and elevated temperature (200 C). The high radiation requires that the system be remotely deployed. A coherent frequency modulated laser radar-based system will be integrated with a remotely operated deployment mechanism to meet these requirements. The metrology/viewing system consists of a compact laser transceiver optics module which is linked through fiber optics tomore » the laser source and imaging units that are located outside of a biological shield. The deployment mechanism will be a mast-like positioning system. Radiation-damage tests will be conducted on critical sensor components at Oak Ridge National Laboratory to determine threshold damage levels and effects on data transmission. This paper identifies the requirements for International Thermonuclear Experimental Reactor metrology and viewing and describes a remotely operated precision ranging and surface mapping system.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What operational requirements apply to an entity to... Assignment of National Health Service Corps Personnel § 23.8 What operational requirements apply to an entity...; and (g) Establish basic data, cost accounting, and management information and reporting systems as...
Head-mounted display systems and the special operations soldier
NASA Astrophysics Data System (ADS)
Loyd, Rodney B.
1998-08-01
In 1997, the Boeing Company, working with DARPA under the Smart Modules program and the US Army Soldier Systems Command, embarked on an advanced research and development program to develop a wearable computer system tailored for use with soldiers of the US Special Operations Command. The 'special operations combat management system' is a rugged advanced wearable tactical computer, designed to provide the special operations soldier with enhanced situation awareness and battlefield information capabilities. Many issues must be considered during the design of wearable computers for a combat soldier, including the system weight, placement on the body with respect to other equipment, user interfaces and display system characteristics. During the initial feasibility study for the system, the operational environment was examined and potential users were interviewed to establish the proper display solution for the system. Many display system requirements resulted, such as head or helmet mounting, Night Vision Goggle compatibility, minimal visible light emissions, environmental performance and even the need for handheld or other 'off the head' type display systems. This paper will address these issues and other end user requirements for display systems for applications in the harsh and demanding environment of the Special Operations soldier.
The moderate resolution imaging spectrometer (MODIS) science and data system requirements
NASA Technical Reports Server (NTRS)
Ardanuy, Philip E.; Han, Daesoo; Salomonson, Vincent V.
1991-01-01
The Moderate Resolution Imaging Spectrometer (MODIS) has been designated as a facility instrument on the first NASA polar orbiting platform as part of the Earth Observing System (EOS) and is scheduled for launch in the late 1990s. The near-global daily coverage of MODIS, combined with its continuous operation, broad spectral coverage, and relatively high spatial resolution, makes it central to the objectives of EOS. The development, implementation, production, and validation of the core MODIS data products define a set of functional, performance, and operational requirements on the data system that operate between the sensor measurements and the data products supplied to the user community. The science requirements guiding the processing of MODIS data are reviewed, and the aspects of an operations concept for the production of data products from MODIS for use by the scientific community are discussed.
Operational fitness of box truss antennas in response to dynamic slewing
NASA Technical Reports Server (NTRS)
Bachtell, E. E.; Bettadapur, S. S.; Schartel, W. A.; Karanian, L. A.
1985-01-01
A parametric study was performed to define slewing capability of large satellites along with associated system changes or subsystem weight and complexity impacts. The satellite configuration and structural arrangement from the Earth Observation Spacecraft (EOS) study was used as the baseline spacecraft. Varying slew rates, settling times, damping, maneuver frequencies, and attitude hold times provided the data required to establish applicability to a wide range of potential missions. The key elements of the study are: (1) determine the dynamic transient response of the antenna system; (2) calculate the system errors produced by the dynamic response; (3) determine if the antenna has exceeded operational requirements at completion of the slew, and if so; (4) determine when the antenna has settled to the operational requirements. The slew event is not considered complete until the antenna is within operational limits.
Space shuttle engineering and operations support. Avionics system engineering
NASA Technical Reports Server (NTRS)
Broome, P. A.; Neubaur, R. J.; Welsh, R. T.
1976-01-01
The shuttle avionics integration laboratory (SAIL) requirements for supporting the Spacelab/orbiter avionics verification process are defined. The principal topics are a Spacelab avionics hardware assessment, test operations center/electronic systems test laboratory (TOC/ESL) data processing requirements definition, SAIL (Building 16) payload accommodations study, and projected funding and test scheduling. Because of the complex nature of the Spacelab/orbiter computer systems, the PCM data link, and the high rate digital data system hardware/software relationships, early avionics interface verification is required. The SAIL is a prime candidate test location to accomplish this early avionics verification.
10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-01
Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less
NASA Technical Reports Server (NTRS)
Harvey, Craig
2005-01-01
NASA's vision for space exploration (February 2004) calls for development of a new crew exploration vehicle, sustained lunar operations, and human exploration of Mars. To meet the challenges of planned sustained operations as well as the limited communications between Earth and the crew (e.g., Mars exploration), many systems will require crews to operate in an autonomous environment. It has been estimated that once every 2.4 years a major medical issue will occur while in space. NASA's future travels, especially to Mars, will begin to push this timeframe. Therefore, now is the time for investigating technologies and systems that will support crews in these environments. Therefore, this summer two studies were conducted to evaluate the technology and systems that may be used by crews in future missions. The first study evaluated three commercial Indoor Positioning Systems (IPS) (Versus, Ekahau, and Radianse) that can track equipment and people within a facility. While similar to Global Positioning Systems (GPS), the specific technology used is different. Several conclusions can be drawn from the evaluation conducted, but in summary it is clear that none of the systems provides a complete solution in meeting the tracking and technology integration requirements of NASA. From a functional performance (e.g., system meets user needs) evaluation perspective, Versus performed fairly well on all performance measures as compared to Ekahau and Radianse. However, the system only provides tracking at the room level. Thus, Versus does not provide the level of fidelity required for tracking assets or people for NASA requirements. From an engineering implementation perspective, Ekahau is far simpler to implement that the other two systems because of its wi-fi design (e.g., no required runs of cable). By looking at these two perspectives, one finds there was no clear system that met NASA requirements. Thus it would be premature to suggest that any of these systems are ready for implementation and further study is required.
Observational Requirements for Underway Observations from Research Vessels
NASA Astrophysics Data System (ADS)
Smith, S. R.; Van Waes, M.
2016-02-01
Identifying observational requirements to build and sustain a global ocean observing system requires input from the user community. Research vessels are an essential and versatile component of the observing system. The authors will present results from a survey of the marine climate and oceanographic community that solicited observational requirements for research vessels. The goal of the survey is to determine priorities for underway instrumentation to be run on NOAA vessels operated by the Office of Marine and Aviation Operations (OMAO) to support secondary users of the NOAA fleet. Secondary users are defined as persons that do not routinely participate in cruises on NOAA vessels, but have a research or operational need for underway observations from these vessels. Secondary applications of underway data from NOAA vessels include, but are not limited to, evaluation of analyses/forecast from ocean and atmospheric models, developing satellite retrieval algorithms, and validating observations from remote sensing systems (e.g., satellites, aircraft). For this survey, underway observations are defined as digital data generated by environmental sensor systems permanently installed on the vessel and routinely maintained by the operator. The survey also assessed the need for access to these observations in real-time versus delayed-mode. The authors will discuss how these survey results can be used to inform NOAA management on the requirements for underway observations during future NOAA vessel deployments. Although originally designed to assess requirements for NOAA vessels, the international response to the survey makes the results applicable to research vessel operations around the world.
Natural interaction for unmanned systems
NASA Astrophysics Data System (ADS)
Taylor, Glenn; Purman, Ben; Schermerhorn, Paul; Garcia-Sampedro, Guillermo; Lanting, Matt; Quist, Michael; Kawatsu, Chris
2015-05-01
Military unmanned systems today are typically controlled by two methods: tele-operation or menu-based, search-andclick interfaces. Both approaches require the operator's constant vigilance: tele-operation requires constant input to drive the vehicle inch by inch; a menu-based interface requires eyes on the screen in order to search through alternatives and select the right menu item. In both cases, operators spend most of their time and attention driving and minding the unmanned systems rather than on being a warfighter. With these approaches, the platform and interface become more of a burden than a benefit. The availability of inexpensive sensor systems in products such as Microsoft Kinect™ or Nintendo Wii™ has resulted in new ways of interacting with computing systems, but new sensors alone are not enough. Developing useful and usable human-system interfaces requires understanding users and interaction in context: not just what new sensors afford in terms of interaction, but how users want to interact with these systems, for what purpose, and how sensors might enable those interactions. Additionally, the system needs to reliably make sense of the user's inputs in context, translate that interpretation into commands for the unmanned system, and give feedback to the user. In this paper, we describe an example natural interface for unmanned systems, called the Smart Interaction Device (SID), which enables natural two-way interaction with unmanned systems including the use of speech, sketch, and gestures. We present a few example applications SID to different types of unmanned systems and different kinds of interactions.
NASA Technical Reports Server (NTRS)
1976-01-01
The flight payload, its operation, and the support required from the Space Transporatation System (STS) is defined including the flight objectives and requirements, the experiment operations, and the payload configurations. The support required from the STS includes the accommodation of the payload by the orbiter/Spacelab, use of the flight operations network and ground facilities, and the use of the launch site facilities.
Douglas flight deck design philosophy
NASA Technical Reports Server (NTRS)
Oldale, Paul
1990-01-01
The systems experience gained from 17 years of DC-10 operation was used during the design of the MD-11 to automate system operation and reduce crew workload. All functions, from preflight to shutdown at the termination of flight, require little input from the crew. The MD-11 aircraft systems are monitored for proper operation by the Aircraft Systems Controllers (ASC). In most cases, system reconfiguration as a result of a malfunction is automated. Manual input is required for irreversible actions such as engine shutdown, fuel dump, fire agent discharge, or Integrated Drive Generator (IDG) disconnect. During normal operations, when the cockpit is configured for flight, all annunciators on the overhead panel will be extinguished. This Dark Cockpit immediately confirms to the crew that the panels are correctly configured and that no abnormalities are present. Primary systems annunciations are shown in text on the Alert Area of the Engine and Alert Display (EAD). This eliminates the need to scan the overhead. The MD-11 aircraft systems can be manually controlled from the overhead area of the cockpit. The center portion of the overhead panel is composed of the primary aircraft systems panels, which include FUEL, AIR, Electrical (ELEC) and Hydraulic (HYD) systems, which are easily accessible from both flight crew positions. Each Aircraft Systems Controller (ASC) has two automatic channels and a manual mode. All rectangular lights are annunciators. All square lights are combined switches and annunciators called switch/lights. Red switch/lights on the overhead (Level 3 alerts) are for conditions requiring immediate crew action. Amber (Level 2 or Level 1 alerts) indicates a fault or switch out of position requiring awareness or crew interaction. Overhead switches used in normal operating conditions will illuminate blue when in use (Level 0 alerts) such as WING ANTI-ICE - ON. An overhead switch/light with BLACK LETTERING on an amber or red background indicates a system failure and that crew interaction is required. A switch/light with blue or amber lettering and a BLACK BACKGROUND indicates a switch out of normal position and that crew action is necessary only if the system is in manual operation.
Advanced information processing system: Local system services
NASA Technical Reports Server (NTRS)
Burkhardt, Laura; Alger, Linda; Whittredge, Roy; Stasiowski, Peter
1989-01-01
The Advanced Information Processing System (AIPS) is a multi-computer architecture composed of hardware and software building blocks that can be configured to meet a broad range of application requirements. The hardware building blocks are fault-tolerant, general-purpose computers, fault-and damage-tolerant networks (both computer and input/output), and interfaces between the networks and the computers. The software building blocks are the major software functions: local system services, input/output, system services, inter-computer system services, and the system manager. The foundation of the local system services is an operating system with the functions required for a traditional real-time multi-tasking computer, such as task scheduling, inter-task communication, memory management, interrupt handling, and time maintenance. Resting on this foundation are the redundancy management functions necessary in a redundant computer and the status reporting functions required for an operator interface. The functional requirements, functional design and detailed specifications for all the local system services are documented.
NASA Technical Reports Server (NTRS)
Garrocq, C. A.; Hurley, M. J.
1973-01-01
Viable designs are presented of various elements of the IPAD framework software, data base management system, and required new languages in relation to the capabilities of operating systems software. A thorough evaluation was made of the basic systems functions to be provide by each software element, its requirements defined in the conceptual design, the operating systems features affecting its design, and the engineering/design functions which it was intended to enhance.
Telerobotic on-orbit remote fluid resupply system
NASA Technical Reports Server (NTRS)
1990-01-01
The development of a telerobotic on-orbit fluid resupply demonstration system is described. A fluid transfer demonstration system was developed which functionally simulates operations required to remotely transfer fluids (liquids or gases) from a servicing spacecraft to a receiving spacecraft through the use of telerobotic manipulations. The fluid system is representative of systems used by current or planned spacecraft and propulsion stages requiring on-orbit remote resupply. The system was integrated with an existing MSFC remotely controlled manipulator arm to mate/demate couplings for demonstration and evaluation of a complete remotely operated fluid transfer system.
An overview of safety assessment, regulation, and control of hazardous material use at NREL
NASA Astrophysics Data System (ADS)
Nelson, B. P.; Crandall, R. S.; Moskowitz, P. D.; Fthenakis, V. M.
1992-12-01
This paper summarizes the methodology we use to ensure the safe use of hazardous materials at the National Renewable Energy Laboratory (NREL). First, we analyze the processes and the materials used in those processes to identify the hazards presented. Then we study federal, state, and local regulations and apply the relevant requirements to our operations. When necessary, we generate internal safety documents to consolidate this information. We design research operations and support systems to conform to these requirements. Before we construct the systems, we perform a semiquantitative risk analysis on likely accident scenarios. All scenarios presenting an unacceptable risk require system or procedural modifications to reduce the risk. Following these modifications, we repeat the risk analysis to ensure that the respective accident scenarios present an acceptable risk. Once all risks are acceptable, we conduct an operational readiness review (ORR). A management-appointed panel performs the ORR ensuring compliance with all relevant requirements. After successful completion of the ORR, operations can begin.
49 CFR 1544.213 - Use of explosives detection systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 9 2011-10-01 2011-10-01 false Use of explosives detection systems. 1544.213...: AIR CARRIERS AND COMMERCIAL OPERATORS Operations § 1544.213 Use of explosives detection systems. (a) Use of explosive detection equipment. If TSA so requires by an amendment to an aircraft operator's...
49 CFR 1544.213 - Use of explosives detection systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 9 2014-10-01 2014-10-01 false Use of explosives detection systems. 1544.213...: AIR CARRIERS AND COMMERCIAL OPERATORS Operations § 1544.213 Use of explosives detection systems. (a) Use of explosive detection equipment. If TSA so requires by an amendment to an aircraft operator's...
49 CFR 1544.213 - Use of explosives detection systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 9 2013-10-01 2013-10-01 false Use of explosives detection systems. 1544.213...: AIR CARRIERS AND COMMERCIAL OPERATORS Operations § 1544.213 Use of explosives detection systems. (a) Use of explosive detection equipment. If TSA so requires by an amendment to an aircraft operator's...
49 CFR 1544.213 - Use of explosives detection systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 9 2012-10-01 2012-10-01 false Use of explosives detection systems. 1544.213...: AIR CARRIERS AND COMMERCIAL OPERATORS Operations § 1544.213 Use of explosives detection systems. (a) Use of explosive detection equipment. If TSA so requires by an amendment to an aircraft operator's...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Programs § 1028.200 General. Operators of credit card systems are subject to the program requirements set forth and cross referenced in this subpart. Operators of credit card systems should also refer to Subpart B of Part 1010 of...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Programs § 1028.200 General. Operators of credit card systems are subject to the program requirements set forth and cross referenced in this subpart. Operators of credit card systems should also refer to Subpart B of Part 1010 of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Programs § 1028.200 General. Operators of credit card systems are subject to the program requirements set forth and cross referenced in this subpart. Operators of credit card systems should also refer to Subpart B of Part 1010 of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Programs § 1028.200 General. Operators of credit card systems are subject to the program requirements set forth and cross referenced in this subpart. Operators of credit card systems should also refer to Subpart B of Part 1010 of...
46 CFR 76.27-15 - Operation and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...
1994-04-18
because they represent a microkernel and monolithic kernel approach to MLS operating system issues. TMACH is I based on MACH, a distributed operating...the operating system is [L.sed on a microkernel design or a monolithic kernel design. This distinction requires some caution since monolithic operating...are provided by 3 user-level processes, in contrast to standard UNIX, which has a large monolithic kernel that pro- I - 22 - Distributed O)perating
NASA Technical Reports Server (NTRS)
1972-01-01
Major study areas treated in this volume are: 1) operations and control and 2) the telecommunication service system. The TDRS orbit selection, orbital deployment, ground station visibility, sequence of events from launch to final orbit position, and TDRS control center functions required for stationkeeping, repositioning, attitude control, and antenna pointing are briefly treated as part of the operations and control section. The last topic of this section concerns the operations required for efficiently providing the TDRSS user telecommunication services. The discussion treats functions of the GSFC control and data processing facility, ground station, and TDRS control center. The second major portion of this volume deals with the Telecommunication Service System (TSS) which consists of the ground station, TDRS communication equipment and the user transceiver. A summary of the requirements and objectives for the telecommunication services and a brief summary of the TSS capabilities is followed by communication system analysis, signal design, and equipment design. Finally, descriptions of the three TSS elements are presented.
46 CFR 39.30-1 - Operational requirements-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Operational requirements-TB/ALL. 39.30-1 Section 39.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS VAPOR CONTROL SYSTEMS Operations § 39.30-1 Operational requirements—TB/ALL. (a) Vapor from a tank vessel may not be transferred to: (1) A...
46 CFR 39.30-1 - Operational requirements-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Operational requirements-TB/ALL. 39.30-1 Section 39.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS VAPOR CONTROL SYSTEMS Operations § 39.30-1 Operational requirements—TB/ALL. (a) Vapor from a tank vessel may not be transferred to: (1) A...
Up gradation of LHCD system for rf power level up to 2MW for SST1
NASA Astrophysics Data System (ADS)
Sharma, P. K.; Ambulkar, K. K.; Parmar, P. R.; Virani, C. G.; Thakur, A. L.; Kulkarni, S. V.; Lhcd Group
2010-02-01
To operate superconducting steadystate tokamak (SST1) for 1000 seconds, lower hybrid current drive (LHCD) system has been designed at a frequency of 3.7 GHz., which would couple 1.0 MW CW of microwave power to the shaped plasma. The system consists of various rf passive components and transmission line, employing which the rf power from the source is transported to the antenna. During calibration of transmission line, it was observed that the losses in the transmission line is substantial and eventually would lead to less coupled power to the plasma. Further it is anticipated that more LH power would be required for advanced operation of SST1 machine. Thus it is decided to upgrade the existing LHCD system to 2 MW CW power level. The proposed up gradation would demand several infra structural changes and needs to be addressed. Due to lack of space, we have proposed a scheme in which additional two klystrons, along with existing two klystrons would be accommodated in the existing space. The low rf power requirements have also been increased to cater the new needs. Accordingly additional cooling requirements have been proposed to accommodate the two new klystrons. The DAC and auxiliary power supplies have been also designed. The new up graded LHCD system would address several key technological issues. Firstly it would establish the operation of four klystrons at rated power in parallel employing single RHVPS (80kV, 70A). Secondly it would establish the operation of two high power klystrons operation at rated power when their collectors are cooled in series. In this paper we would present the various requirements for up-gradation of LHCD system to 2MW. The main requirements like high power rf source, along with modified support structure, low power rf systems to drive the high power rf source, auxiliary power supplies required for high power rf source, DAC system improvement, cooling improvements, etc. would be discussed.
Research and application of embedded real-time operating system
NASA Astrophysics Data System (ADS)
Zhang, Bo
2013-03-01
In this paper, based on the analysis of existing embedded real-time operating system, the architecture of an operating system is designed and implemented. The experimental results show that the design fully complies with the requirements of embedded real-time operating system, can achieve the purposes of reducing the complexity of embedded software design and improving the maintainability, reliability, flexibility. Therefore, this design program has high practical value.
Code of Federal Regulations, 2013 CFR
2013-07-01
... system and add-on control device operating limits during the performance test? 63.4767 Section 63.4767... system and add-on control device operating limits during the performance test? During the performance... operating limits required by § 63.4692 according to this section, unless you have received approval for...
Code of Federal Regulations, 2010 CFR
2010-07-01
... system and add-on control device operating limits during the performance test? 63.3967 Section 63.3967... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.3892 according to this section, unless you have received...
Code of Federal Regulations, 2011 CFR
2011-07-01
... system and add-on control device operating limits during the performance test? 63.3967 Section 63.3967... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.3892 according to this section, unless you have received...
Code of Federal Regulations, 2013 CFR
2013-07-01
... system and add-on control device operating limits during the performance test? 63.3967 Section 63.3967... emission capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.3892 according to this section, unless you have received...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.4167 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4092 according to this section unless you have received approval...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.4567 Section 63... emission capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4492 according to this section, unless you have received...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.3967 Section 63... establish the emission capture system and add-on control device operating limits during the performance test... must establish the operating limits required by § 63.3892 according to this section, unless you have...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.4167 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4092 according to this section unless you have received approval...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.4767 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4692 according to this section, unless you have received...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.4767 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4692 according to this section, unless you have received...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.3967 Section 63... establish the emission capture system and add-on control device operating limits during the performance test... must establish the operating limits required by § 63.3892 according to this section, unless you have...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.4567 Section 63... emission capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4492 according to this section, unless you have received...
Code of Federal Regulations, 2013 CFR
2013-07-01
... system and add-on control device operating limits during the performance test? 63.4567 Section 63.4567... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4492 according to this section, unless you have received...
Guidance and control requirements for high-speed Rollout and Turnoff (ROTO)
NASA Technical Reports Server (NTRS)
Goldthorpe, Steve H.; Kernik, Alan C.; Mcbee, Larry S.; Preston, Orv W.
1995-01-01
This report defines the initial requirements for designing a research high-speed rollout and turnoff (ROTO) guidance and control system applicable to transport class aircraft whose purpose is to reduce the average runway occupancy time (ROT) for aircraft operations. The requirements will be used to develop a ROTO system for both automatic and manual piloted operation under normal and reduced visibility conditions. Requirements were determined for nose wheel/rudder steering, braking/reverse thrust, and the navigation system with the aid of a non-real time, three degree-of-freedom MD-11 simulation program incorporating airframe and gear dynamics. The requirements were developed for speeds up to 70 knots using 30 ft exit geometries under dry and wet surface conditions. The requirements were generated under the assumptions that the aircraft landing system meets the current Category III touchdown dispersion requirements and that aircraft interarrival spacing is 2 nautical miles. This effort determined that auto-asymmetric braking is needed to assist steering for aft center-of-gravity aircraft. This report shows various time-history plots of the aircraft performance for the ROTO operation. This effort also investigated the state-of-the-art in the measurement of the runway coefficient of friction for various runway conditions.
Realtime multi-plot graphics system
NASA Technical Reports Server (NTRS)
Shipkowski, Michael S.
1990-01-01
The increased complexity of test operations and customer requirements at Langley Research Center's National Transonic Facility (NTF) surpassed the capabilities of the initial realtime graphics system. The analysis of existing hardware and software and the enhancements made to develop a new realtime graphics system are described. The result of this effort is a cost effective system, based on hardware already in place, that support high speed, high resolution, generation and display of multiple realtime plots. The enhanced graphics system (EGS) meets the current and foreseeable future realtime graphics requirements of the NTF. While this system was developed to support wind tunnel operations, the overall design and capability of the system is applicable to other realtime data acquisition systems that have realtime plot requirements.
NASA Technical Reports Server (NTRS)
Shepard, Kyle; Sager, Paul; Kusunoki, Sid; Porter, John; Campion, AL; Mouritzan, Gunnar; Glunt, George; Vegter, George; Koontz, Rob
1993-01-01
Several topics are presented in viewgraph form which together encompass the preliminary assessment of nuclear thermal rocket engine clustering. The study objectives, schedule, flow, and groundrules are covered. This is followed by the NASA groundrules mission and our interpretation of the associated operational scenario. The NASA reference vehicle is illustrated, then the four propulsion system options are examined. Each propulsion system's preliminary design, fluid systems, operating characteristics, thrust structure, dimensions, and mass properties are detailed as well as the associated key propulsion system/vehicle interfaces. A brief series of systems analysis is also covered including: thrust vector control requirements, engine out possibilities, propulsion system failure modes, surviving system requirements, and technology requirements. An assessment of vehicle/propulsion system impacts due to the lessons learned are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saw, C; Baikadi, M; Peters, C
2015-06-15
Purpose: Using systems engineering to design HDR skin treatment operation for small lesions using shielded applicators to enhance patient safety. Methods: Systems engineering is an interdisciplinary field that offers formal methodologies to study, design, implement, and manage complex engineering systems as a whole over their life-cycles. The methodologies deal with human work-processes, coordination of different team, optimization, and risk management. The V-model of systems engineering emphasize two streams, the specification and the testing streams. The specification stream consists of user requirements, functional requirements, and design specifications while the testing on installation, operational, and performance specifications. In implementing system engineering tomore » this project, the user and functional requirements are (a) HDR unit parameters be downloaded from the treatment planning system, (b) dwell times and positions be generated by treatment planning system, (c) source decay be computer calculated, (d) a double-check system of treatment parameters to comply with the NRC regulation. These requirements are intended to reduce human intervention to improve patient safety. Results: A formal investigation indicated that the user requirements can be satisfied. The treatment operation consists of using the treatment planning system to generate a pseudo plan that is adjusted for different shielded applicators to compute the dwell times. The dwell positions, channel numbers, and the dwell times are verified by the medical physicist and downloaded into the HDR unit. The decayed source strength is transferred to a spreadsheet that computes the dwell times based on the type of applicators and prescribed dose used. Prior to treatment, the source strength, dwell times, dwell positions, and channel numbers are double-checked by the radiation oncologist. No dosimetric parameters are manually calculated. Conclusion: Systems engineering provides methodologies to effectively design the HDR treatment operation that minimize human intervention and improve patient safety.« less
Cost analysis of oxygen recovery systems
NASA Technical Reports Server (NTRS)
Yakut, M. M.
1973-01-01
Report is made of the cost analysis of four leading oxygen recovery subsystems which include two carbon dioxide reduction subsystems and two water electrolysis subsystems, namely, the solid polymer electrolyte and the circulating KOH electrolyte. The four oxygen recovery systems were quantitatively evaluated. System characteristics, including process flows, performance, and physical characteristics were also analyzed. Additionally, the status of development of each of the systems considered and the required advance technology efforts required to bring conceptual and/or pre-prototype hardware to an operational prototype status were defined. Intimate knowledge of the operations, development status, and capabilities of the systems to meet space mission requirements were found to be essential in establishing the cost estimating relationships for advanced life support systems.
30 CFR 764.21 - Data base and inventory system requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Data base and inventory system requirements... SURFACE COAL MINING OPERATIONS § 764.21 Data base and inventory system requirements. (a) The regulatory authority shall develop a data base and inventory system which will permit evaluation of whether reclamation...
30 CFR 764.21 - Data base and inventory system requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Data base and inventory system requirements... SURFACE COAL MINING OPERATIONS § 764.21 Data base and inventory system requirements. (a) The regulatory authority shall develop a data base and inventory system which will permit evaluation of whether reclamation...
30 CFR 764.21 - Data base and inventory system requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Data base and inventory system requirements... SURFACE COAL MINING OPERATIONS § 764.21 Data base and inventory system requirements. (a) The regulatory authority shall develop a data base and inventory system which will permit evaluation of whether reclamation...
30 CFR 764.21 - Data base and inventory system requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Data base and inventory system requirements... SURFACE COAL MINING OPERATIONS § 764.21 Data base and inventory system requirements. (a) The regulatory authority shall develop a data base and inventory system which will permit evaluation of whether reclamation...
40 CFR 280.41 - Requirements for petroleum UST systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Requirements for petroleum UST systems... UNDERGROUND STORAGE TANKS (UST) Release Detection § 280.41 Requirements for petroleum UST systems. Owners and operators of petroleum UST systems must provide release detection for tanks and piping as follows: (a) Tanks...
40 CFR 280.41 - Requirements for petroleum UST systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Requirements for petroleum UST systems... UNDERGROUND STORAGE TANKS (UST) Release Detection § 280.41 Requirements for petroleum UST systems. Owners and operators of petroleum UST systems must provide release detection for tanks and piping as follows: (a) Tanks...
NASA Technical Reports Server (NTRS)
McLaughlin, Brian J.; Barrett, Larry K.
2012-01-01
Common practice in the development of simulation systems is meeting all user requirements within a single instantiation. The Joint Polar Satellite System (JPSS) presents a unique challenge to establish a simulation environment that meets the needs of a diverse user community while also spanning a multi-mission environment over decades of operation. In response, the JPSS Flight Vehicle Test Suite (FVTS) is architected with an extensible infrastructure that supports the operation of multiple observatory simulations for a single mission and multiple mission within a common system perimeter. For the JPSS-1 satellite, multiple fidelity flight observatory simulations are necessary to support the distinct user communities consisting of the Common Ground System development team, the Common Ground System Integration & Test team, and the Mission Rehearsal Team/Mission Operations Team. These key requirements present several challenges to FVTS development. First, the FVTS must ensure all critical user requirements are satisfied by at least one fidelity instance of the observatory simulation. Second, the FVTS must allow for tailoring of the system instances to function in diverse operational environments from the High-security operations environment at NOAA Satellite Operations Facility (NSOF) to the ground system factory floor. Finally, the FVTS must provide the ability to execute sustaining engineering activities on a subset of the system without impacting system availability to parallel users. The FVTS approach of allowing for multiple fidelity copies of observatory simulations represents a unique concept in simulator capability development and corresponds to the JPSS Ground System goals of establishing a capability that is flexible, extensible, and adaptable.
2008-12-01
A SYSTEMS ENGINEERING PROCESS SUPPORTING THE DEVELOPMENT OF OPERATIONAL REQUIREMENTS DRIVEN FEDERATIONS Andreas Tolk & Thomas G. Litwin ...c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 Tolk, Litwin and Kewley Executive Office (PEO...capabilities and their relative changes 1297 Tolk, Litwin and Kewley based on the system to be evaluated as well, in particular when it comes to
Advanced nickel-hydrogen cell configuration study
NASA Technical Reports Server (NTRS)
1983-01-01
Long-term trends in the evolution of space power technology point toward increased payload power demand which in turn translates into both higher battery system charge storage capability and higher operating voltages. State of the art nickel-hydrogen cells of the 50 to 60 Wh size, packaged in individual pressure vessels, are capable of meeting the required cycle life for a wide range of anticipated operating conditions; however, they provided several drawbacks to battery system integrated efforts. Because of size, high voltage/high power systems require integrating hundreds of cells into the operating system. Packaging related weight and volume inefficiencies degrade the energy density and specific energy of individual cells currently at 30 Wh/cudm and 40 Wh/kg respectively. In addition, the increased parts count and associated handling significantly affect the overall battery related costs. Spacecraft battery systems designers within industry and Government realize that to reduce weight, volume, and cost requires increases in the capacity of nickel-hydrogen cells.
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...
40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... tolerance of 1.27 centimeters of water or a transducer with a minimum tolerance of 1 percent of the pressure... use a fabric filter bag leak detection system to comply with the requirements of this subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as specified in...
Degree Audit Systems: Are They Worth It?
ERIC Educational Resources Information Center
Johns, Virginia
2006-01-01
A lot of various degree audit systems are available on the market and most often they have similar features such as the functionality they each provide, the technical platforms upon which they operate, their requirements for interfacing with the local SIS, the ease of use, and the level of effort required to implement and operate. However, the…
30 CFR 250.442 - What are the requirements for a subsea BOP stack?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations...) When you drill with a subsea BOP stack, you must install the BOP system before drilling below surface casing. The District Manager may require you to install a subsea BOP system before drilling below the...
American Association of University Women: Branch Operations Data Modeling Case
ERIC Educational Resources Information Center
Harris, Ranida B.; Wedel, Thomas L.
2015-01-01
A nationally prominent woman's advocacy organization is featured in this case study. The scenario may be used as a teaching case, an assignment, or a project in systems analysis and design as well as database design classes. Students are required to document the system operations and requirements, apply logical data modeling concepts, and design…
Assessment of flying-quality criteria for air-breathing aerospacecraft
NASA Technical Reports Server (NTRS)
Mcruer, Duane T.; Myers, Thomas T.; Hoh, Roger H.; Ashkenas, Irving L.; Johnston, Donald E.
1992-01-01
A study of flying quality requirements for air breathing aerospacecraft gives special emphasis to the unusual operational requirements and characteristics of these aircraft, including operation at hypersonic speed. The report considers distinguishing characteristics of these vehicles, including dynamic deficiencies and their implications for control. Particular emphasis is given to the interaction of the airframe and propulsion system, and the requirements for dynamic systems integration. Past operational missions are reviewed to define tasks and maneuvers to be considered for this class of aircraft. Areas of special concern with respect to vehicle dynamics and control are identified. Experience with the space shuttle orbiter is reviewed with respect to flight control system mechanization and flight experience in approach and landing flying qualities for the National Aerospace Plane (NASP).
Payload operations control center network (POCCNET) systems definition phase study report
NASA Technical Reports Server (NTRS)
Desjardins, R.
1978-01-01
The results of the studies performed during the systems definition phase of POCCNET are presented. The concept of POCCNET as a system of standard POCCs is described and an analysis of system requirements is also included. Alternative systems concepts were evaluated as well as various methods for development of reliable reusable software. A number of POCC application areas, such as command management, on board computer support, and simulation were also studied. Other areas of investigation included the operation of POCCNET systems, the facility requirements and usage.
14 CFR 105.13 - Radio equipment and use requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Radio equipment and use requirements. 105... (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES PARACHUTE OPERATIONS Operating Rules § 105.13 Radio...) The aircraft is equipped with a functioning two-way radio communication system appropriate to the air...
30 CFR 250.433 - What are the diverter actuation and testing requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.433 What are the diverter actuation and.... (a) For drilling operations with a surface wellhead configuration, you must actuate the diverter...
30 CFR 250.431 - What are the diverter design and installation requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.431 What are the diverter... wellhead configurations and at least 12 inches for floating drilling operations; (b) Use dual diverter...
30 CFR 250.433 - What are the diverter actuation and testing requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.433 What are the diverter...-test the vent lines. (a) For drilling operations with a surface wellhead configuration, you must...
30 CFR 250.433 - What are the diverter actuation and testing requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.433 What are the diverter actuation and.... (a) For drilling operations with a surface wellhead configuration, you must actuate the diverter...
30 CFR 250.433 - What are the diverter actuation and testing requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.433 What are the diverter actuation and.... (a) For drilling operations with a surface wellhead configuration, you must actuate the diverter...
21 CFR 821.25 - Device tracking system and content requirements: manufacturer requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... manufacturer of a tracked device shall keep current records in accordance with its standard operating procedure... this section. A manufacturer shall make this standard operating procedure available to FDA upon request. A manufacturer shall incorporate the following into the standard operating procedure: (1) Data...
21 CFR 821.25 - Device tracking system and content requirements: manufacturer requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... manufacturer of a tracked device shall keep current records in accordance with its standard operating procedure... this section. A manufacturer shall make this standard operating procedure available to FDA upon request. A manufacturer shall incorporate the following into the standard operating procedure: (1) Data...
21 CFR 821.25 - Device tracking system and content requirements: manufacturer requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufacturer of a tracked device shall keep current records in accordance with its standard operating procedure... this section. A manufacturer shall make this standard operating procedure available to FDA upon request. A manufacturer shall incorporate the following into the standard operating procedure: (1) Data...
21 CFR 821.25 - Device tracking system and content requirements: manufacturer requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... accordance with its standard operating procedure of the information identified in paragraphs (a)(1), (a)(2... shall establish a written standard operating procedure for the collection, maintenance, and auditing of... standard operating procedure: (1) Data collection and recording procedures, which shall include a procedure...
21 CFR 821.25 - Device tracking system and content requirements: manufacturer requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... manufacturer of a tracked device shall keep current records in accordance with its standard operating procedure... this section. A manufacturer shall make this standard operating procedure available to FDA upon request. A manufacturer shall incorporate the following into the standard operating procedure: (1) Data...
30 CFR 250.803 - Additional production system requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ranges of pressure vessels at any time when there is a change in operating pressures that requires new... significant change in operating pressures. The most recent pressure-recorder charts used to determine... prominent place on the facility or structure. (v) For operations in subfreezing climates, the lessee shall...
Code of Federal Regulations, 2012 CFR
2012-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2011 CFR
2011-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2010 CFR
2010-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2013 CFR
2013-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
Code of Federal Regulations, 2014 CFR
2014-07-01
... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
NASA Technical Reports Server (NTRS)
Mulhall, B. D. L.
1980-01-01
An evaluation is presented which is defined as the adequacy of system design with known functional and performance requirements. The proposed Rockwell International AIDS 3 card, document and data flow are presented to summarize the concepts involved and the relationships between functions. The analysis and evaluation includes a study of system capability, processing rates, search requirements and response accuracy as well as a consideration of operational components and hardware integration. Results indicate that the AIDS 3 System concept is operationally feasible if production capacity is slightly enhanced but that operational complexity, hardware integration and a lack of conceptual data pertinent to some of the functions are areas of concern.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holter, Gregory M
2001-01-26
This Operational Requirements Document (ORD) describes the capabilities that need to be incorporated in the NCC interactive simulation system being developed under the auspices of the NCC development program. The ORD addresses the necessary capabilities (i.e. what the system needs to be able to do); it defines the envelope of situations and circumstances that the NCC system must be able to represent and operate within. The NCC system will be developed in modules over a period of several years. This ORD, Version 2, supersedes the previous version. Future updates of this ORD are anticipated to be issued as needed tomore » guide the development of later versions of the NCC system.« less
The Large Synoptic Survey Telescope OCS and TCS models
NASA Astrophysics Data System (ADS)
Schumacher, German; Delgado, Francisco
2010-07-01
The Large Synoptic Survey Telescope (LSST) is a project envisioned as a system of systems with demanding science, technical, and operational requirements, that must perform as a fully integrated unit. The design and implementation of such a system poses big engineering challenges when performing requirements analysis, detailed interface definitions, operational modes and control strategy studies. The OMG System Modeling Language (SysML) has been selected as the framework for the systems engineering analysis and documentation for the LSST. Models for the overall system architecture and different observatory subsystems have been built describing requirements, structure, interfaces and behavior. In this paper we show the models for the Observatory Control System (OCS) and the Telescope Control System (TCS), and how this methodology has helped in the clarification of the design and requirements. In one common language, the relationships of the OCS, TCS, Camera and Data management subsystems are captured with models of the structure, behavior, requirements and the traceability between them.
xLuna - D emonstrator on ESA Mars Rover
NASA Astrophysics Data System (ADS)
Braga, P.; Henriques, L.; Carvalho, B.; Chevalley, P.; Zulianello, M.
2008-08-01
There is a significant gap between the services offered by existing space qualified Real-Time Operating Systems (RTOS) and those required by the most demanding future space applications. New requirements for autonomy, terrain mapping and navigation, Simultaneous Location and Mapping (SLAM), improvement of the throughput of science tasks, all demand high level services such as file systems or POSIX compliant interfaces. xLuna is an operating system that aims fulfilling these new requirements. Besides providing the typical services that of an RTOS (tasks and interrupts management, timers, message queues, etc), it also includes most of the features available in modern general-purpose operating systems, such as Linux. This paper describes a case study that proposes to demonstrate the usage of xLuna on board a rover currently in use for the development of algorithms in preparation of a mission to Mars.
Real-time operating system for selected Intel processors
NASA Technical Reports Server (NTRS)
Pool, W. R.
1980-01-01
The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.
Demonstrating Operating System Principles via Computer Forensics Exercises
ERIC Educational Resources Information Center
Duffy, Kevin P.; Davis, Martin H., Jr.; Sethi, Vikram
2010-01-01
We explore the feasibility of sparking student curiosity and interest in the core required MIS operating systems course through inclusion of computer forensics exercises into the course. Students were presented with two in-class exercises. Each exercise demonstrated an aspect of the operating system, and each exercise was written as a computer…
DOT National Transportation Integrated Search
2017-06-06
Successful integration of Unmanned Aerial Vehicle (UAV) operations into the National Airspace System requires the identification and mitigation of operational risks. This report reviews human factors issues that have been identified in operational as...
46 CFR 76.35-15 - Operation and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...
Survey of Propulsion Systems for High Capacity Personal Rapid Transit
DOT National Transportation Integrated Search
1975-07-01
The high-capacity personal rapid transit (HCPRT) system must operate with very short headways. To achieve safe operation at these headways, the propulsion system should meet certain unconventional requirements. They include reversible thrust capabili...
40 CFR 63.3900 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation(s) for which you use the compliant material option or the emission rate without add-on controls... § 63.3890 at all times. (2) Any coating operation(s) for which you use the emission rate with add-on... for emission capture systems and add-on control devices required by § 63.3892 at all times except...
40 CFR 63.3900 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation(s) for which you use the compliant material option or the emission rate without add-on controls... § 63.3890 at all times. (2) Any coating operation(s) for which you use the emission rate with add-on... for emission capture systems and add-on control devices required by § 63.3892 at all times except...
40 CFR 63.3900 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation(s) for which you use the compliant material option or the emission rate without add-on controls... § 63.3890 at all times. (2) Any coating operation(s) for which you use the emission rate with add-on... for emission capture systems and add-on control devices required by § 63.3892 at all times except...
Water Recovery System Architecture and Operational Concepts to Accommodate Dormancy
NASA Technical Reports Server (NTRS)
Carter, Layne; Tabb, David; Anderson, Molly
2017-01-01
Future manned missions beyond low Earth orbit will include intermittent periods of extended dormancy. The mission requirement includes the capability for life support systems to support crew activity, followed by a dormant period of up to one year, and subsequently for the life support systems to come back online for additional crewed missions. NASA personnel are evaluating the architecture and operational concepts that will allow the Water Recovery System (WRS) to support such a mission. Dormancy could be a critical issue due to concerns with microbial growth or chemical degradation that might prevent water systems from operating properly when the crewed mission began. As such, it is critical that the water systems be designed to accommodate this dormant period. This paper identifies dormancy issues, concepts for updating the WRS architecture and operational concepts that will enable the WRS to support the dormancy requirement.
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
30 CFR 250.448 - What are the BOP pressure tests requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.448 What are the BOP...
30 CFR 250.448 - What are the BOP pressure tests requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.448 What are the BOP...
30 CFR 250.448 - What are the BOP pressure tests requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.448 What are the BOP...
A scientific operations plan for the large space telescope. [ground support system design
NASA Technical Reports Server (NTRS)
West, D. K.
1977-01-01
The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.
Sub-Network Access Control Technology Demonstrator: Software Design of the Network Management System
2002-08-01
Canadian Operational Fleet. Requirements The proposed network management solution must provide the normal monitoring and configuration mechanisms generally...Joint Warrior Inter- operability Demonstrations (JWID) m and the Communication System Network Inter- Operability (CSNI) Navy Network Trials. In short...management functional area normally includes two main functions: fault isolation and diagnosis, and restoration of the system . In short, an operator
Software Requirements Analysis as Fault Predictor
NASA Technical Reports Server (NTRS)
Wallace, Dolores
2003-01-01
Waiting until the integration and system test phase to discover errors leads to more costly rework than resolving those same errors earlier in the lifecycle. Costs increase even more significantly once a software system has become operational. WE can assess the quality of system requirements, but do little to correlate this information either to system assurance activities or long-term reliability projections - both of which remain unclear and anecdotal. Extending earlier work on requirements accomplished by the ARM tool, measuring requirements quality information against code complexity and test data for the same system may be used to predict specific software modules containing high impact or deeply embedded faults now escaping in operational systems. Such knowledge would lead to more effective and efficient test programs. It may enable insight into whether a program should be maintained or started over.
29 CFR 780.407 - System must be nonprofit or operated on a share-crop basis.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 3 2014-07-01 2014-07-01 false System must be nonprofit or operated on a share-crop basis... Requirements Under Section 13(b)(12) The Irrigation Exemption § 780.407 System must be nonprofit or operated on... on facilities of any irrigation system unless the ditches, canals, reservoirs, or waterways in...
29 CFR 780.407 - System must be nonprofit or operated on a share-crop basis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 3 2010-07-01 2010-07-01 false System must be nonprofit or operated on a share-crop basis... Requirements Under Section 13(b)(12) The Irrigation Exemption § 780.407 System must be nonprofit or operated on... on facilities of any irrigation system unless the ditches, canals, reservoirs, or waterways in...
29 CFR 780.407 - System must be nonprofit or operated on a share-crop basis.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 3 2012-07-01 2012-07-01 false System must be nonprofit or operated on a share-crop basis... Requirements Under Section 13(b)(12) The Irrigation Exemption § 780.407 System must be nonprofit or operated on... on facilities of any irrigation system unless the ditches, canals, reservoirs, or waterways in...
29 CFR 780.407 - System must be nonprofit or operated on a share-crop basis.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 3 2013-07-01 2013-07-01 false System must be nonprofit or operated on a share-crop basis... Requirements Under Section 13(b)(12) The Irrigation Exemption § 780.407 System must be nonprofit or operated on... on facilities of any irrigation system unless the ditches, canals, reservoirs, or waterways in...
29 CFR 780.407 - System must be nonprofit or operated on a share-crop basis.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 3 2011-07-01 2011-07-01 false System must be nonprofit or operated on a share-crop basis... Requirements Under Section 13(b)(12) The Irrigation Exemption § 780.407 System must be nonprofit or operated on... on facilities of any irrigation system unless the ditches, canals, reservoirs, or waterways in...
Functional Requirements Document for HALE UAS Operations in the NAS: Step 1. Version 3
NASA Technical Reports Server (NTRS)
2006-01-01
The purpose of this Functional Requirements Document (FRD) is to compile the functional requirements needed to achieve the Access 5 Vision of "operating High Altitude, Long Endurance (HALE) Unmanned Aircraft Systems (UAS) routinely, safely, and reliably in the national airspace system (NAS)" for Step 1. These functional requirements could support the development of a minimum set of policies, procedures and standards by the Federal Aviation Administration (FAA) and various standards organizations. It is envisioned that this comprehensive body of work will enable the FAA to establish and approve regulations to govern safe operation of UAS in the NAS on a routine or daily "file and fly" basis. The approach used to derive the functional requirements found within this FRD was to decompose the operational requirements and objectives identified within the Access 5 Concept of Operations (CONOPS) into the functions needed to routinely and safely operate a HALE UAS in the NAS. As a result, four major functional areas evolved to enable routine and safe UAS operations for an on-demand basis in the NAS. These four major functions are: Aviate, Navigate, Communicate, and Avoid Hazards. All of the functional requirements within this document can be directly traceable to one of these four major functions. Some functions, however, are traceable to several, or even all, of these four major functions. These cross-cutting functional requirements support the "Command / Control: function as well as the "Manage Contingencies" function. The requirements associated to these high-level functions and all of their supporting low-level functions are addressed in subsequent sections of this document.
NASA Astrophysics Data System (ADS)
Govindaraju, Parithi
Determining the optimal requirements for and design variable values of new systems, which operate along with existing systems to provide a set of overarching capabilities, as a single task is challenging due to the highly interconnected effects that setting requirements on a new system's design can have on how an operator uses this newly designed system. This task of determining the requirements and the design variable values becomes even more difficult because of the presence of uncertainties in the new system design and in the operational environment. This research proposed and investigated aspects of a framework that generates optimum design requirements of new, yet-to-be-designed systems that, when operating alongside other systems, will optimize fleet-level objectives while considering the effects of various uncertainties. Specifically, this research effort addresses the issues of uncertainty in the design of the new system through reliability-based design optimization methods, and uncertainty in the operations of the fleet through descriptive sampling methods and robust optimization formulations. In this context, fleet-level performance metrics result from using the new system alongside other systems to accomplish an overarching objective or mission. This approach treats the design requirements of a new system as decision variables in an optimization problem formulation that a user in the position of making an acquisition decision could solve. This solution would indicate the best new system requirements-and an associated description of the best possible design variable variables for that new system-to optimize the fleet level performance metric(s). Using a problem motivated by recorded operations of the United States Air Force Air Mobility Command for illustration, the approach is demonstrated first for a simplified problem that only considers demand uncertainties in the service network and the proposed methodology is used to identify the optimal design requirements and optimal aircraft sizing variables of new, yet-to-be-introduced aircraft. With this new aircraft serving alongside other existing aircraft, the fleet of aircraft satisfy the desired demand for cargo transportation, while maximizing fleet productivity and minimizing fuel consumption via a multi-objective problem formulation. The approach is then extended to handle uncertainties in both the design of the new system and in the operations of the fleet. The propagation of uncertainties associated with the conceptual design of the new aircraft to the uncertainties associated with the subsequent operations of the new and existing aircraft in the fleet presents some unique challenges. A computationally tractable hybrid robust counterpart formulation efficiently handles the confluence of the two types of domain-specific uncertainties. This hybrid formulation is tested on a larger route network problem to demonstrate the scalability of the approach. Following the presentation of the results obtained, a summary discussion indicates how decision-makers might use these results to set requirements for new aircraft that meet operational needs while balancing the environmental impact of the fleet with fleet-level performance. Comparing the solutions from the uncertainty-based and deterministic formulations via a posteriori analysis demonstrates the efficacy of the robust and reliability-based optimization formulations in addressing the different domain-specific uncertainties. Results suggest that the aircraft design requirements and design description determined through the hybrid robust counterpart formulation approach differ from solutions obtained from the simplistic deterministic approach, and leads to greater fleet-level fuel savings, when subjected to real-world uncertain scenarios (more robust to uncertainty). The research, though applied to a specific air cargo application, is technically agnostic in nature and can be applied to other facets of policy and acquisition management, to explore capability trade spaces for different vehicle systems, mitigate risks, define policy and potentially generate better returns on investment. Other domains relevant to policy and acquisition decisions could utilize the problem formulation and solution approach proposed in this dissertation provided that the problem can be split into a non-linear programming problem to describe the new system sizing and the fleet operations problem can be posed as a linear/integer programming problem.
NASA Aircraft Vortex Spacing System Development Status
NASA Technical Reports Server (NTRS)
Hinton, David A.; Charnock, James K.; Bagwell, Donald R.; Grigsby, Donner
1999-01-01
The National Aeronautics and Space Administration (NASA) is addressing airport capacity enhancements during instrument meteorological conditions through the Terminal Area Productivity (TAP) program. Within TAP, the Reduced Spacing Operations (RSO) subelement at the NASA Langley Research Center is developing an Aircraft VOrtex Spacing System (AVOSS). AVOSS will integrate the output of several systems to produce weather dependent, dynamic wake vortex spacing criteria. These systems provide current and predicted weather conditions, models of wake vortex transport and decay in these weather conditions, and real-time feedback of wake vortex behavior from sensors. The goal of the NASA program is to provide the research and development to demonstrate an engineering model AVOSS in real-time operation at a major airport. The demonstration is only of concept feasibility, and additional effort is required to deploy an operational system for actual aircraft spacing reduction. This paper describes the AVOSS system architecture, a wake vortex facility established at the Dallas-Fort Worth International Airport (DFW), initial operational experience with the AVOSS system, and emerging considerations for subsystem requirements. Results of the initial system operation suggest a significant potential for reduced spacing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... apparatus, main and auxiliary, including bow thruster systems. (2) Cargo hatch operating systems unless... controlled release of the loading so as not to endanger personnel. (3) Watertight door operating system. (4... SYSTEMS Fluid Power and Control Systems § 58.30-1 Scope. (a) This subpart contains requirements for fluid...
Code of Federal Regulations, 2014 CFR
2014-10-01
... apparatus, main and auxiliary, including bow thruster systems. (2) Cargo hatch operating systems unless... controlled release of the loading so as not to endanger personnel. (3) Watertight door operating system. (4... SYSTEMS Fluid Power and Control Systems § 58.30-1 Scope. (a) This subpart contains requirements for fluid...
Code of Federal Regulations, 2013 CFR
2013-10-01
... apparatus, main and auxiliary, including bow thruster systems. (2) Cargo hatch operating systems unless... controlled release of the loading so as not to endanger personnel. (3) Watertight door operating system. (4... SYSTEMS Fluid Power and Control Systems § 58.30-1 Scope. (a) This subpart contains requirements for fluid...
Code of Federal Regulations, 2010 CFR
2010-10-01
... apparatus, main and auxiliary, including bow thruster systems. (2) Cargo hatch operating systems unless... controlled release of the loading so as not to endanger personnel. (3) Watertight door operating system. (4... SYSTEMS Fluid Power and Control Systems § 58.30-1 Scope. (a) This subpart contains requirements for fluid...
Code of Federal Regulations, 2011 CFR
2011-10-01
... apparatus, main and auxiliary, including bow thruster systems. (2) Cargo hatch operating systems unless... controlled release of the loading so as not to endanger personnel. (3) Watertight door operating system. (4... SYSTEMS Fluid Power and Control Systems § 58.30-1 Scope. (a) This subpart contains requirements for fluid...
Present and future free-space quantum key distribution
NASA Astrophysics Data System (ADS)
Nordholt, Jane E.; Hughes, Richard J.; Morgan, George L.; Peterson, C. Glen; Wipf, Christopher C.
2002-04-01
Free-space quantum key distribution (QKD), more popularly know as quantum cryptography, uses single-photon free-space optical communications to distribute the secret keys required for secure communications. At Los Alamos National Laboratory we have demonstrated a fully automated system that is capable of operations at any time of day over a horizontal range of several kilometers. This has proven the technology is capable of operation from a spacecraft to the ground, opening up the possibility of QKD between any group of users anywhere on Earth. This system, the prototyping of a new system for use on a spacecraft, and the techniques required for world-wide quantum key distribution will be described. The operational parameters and performance of a system designed to operate between low earth orbit (LEO) and the ground will also be discussed.
NASA Technical Reports Server (NTRS)
1993-01-01
The Marshall Space Flight Center is responsible for the development and management of advanced launch vehicle propulsion systems, including the Space Shuttle Main Engine (SSME), which is presently operational, and the Space Transportation Main Engine (STME) under development. The SSME's provide high performance within stringent constraints on size, weight, and reliability. Based on operational experience, continuous design improvement is in progress to enhance system durability and reliability. Specialized data analysis and interpretation is required in support of SSME and advanced propulsion system diagnostic evaluations. Comprehensive evaluation of the dynamic measurements obtained from test and flight operations is necessary to provide timely assessment of the vibrational characteristics indicating the operational status of turbomachinery and other critical engine components. Efficient performance of this effort is critical due to the significant impact of dynamic evaluation results on ground test and launch schedules, and requires direct familiarity with SSME and derivative systems, test data acquisition, and diagnostic software. Detailed analysis and evaluation of dynamic measurements obtained during SSME and advanced system ground test and flight operations was performed including analytical/statistical assessment of component dynamic behavior, and the development and implementation of analytical/statistical models to efficiently define nominal component dynamic characteristics, detect anomalous behavior, and assess machinery operational condition. In addition, the SSME and J-2 data will be applied to develop vibroacoustic environments for advanced propulsion system components, as required. This study will provide timely assessment of engine component operational status, identify probable causes of malfunction, and indicate feasible engineering solutions. This contract will be performed through accomplishment of negotiated task orders.