ERIC Educational Resources Information Center
Sobh, Tarek M.; Tibrewal, Abhilasha
2006-01-01
Operating systems theory primarily concentrates on the optimal use of computing resources. This paper presents an alternative approach to teaching and studying operating systems design and concepts by way of parametrically optimizing critical operating system functions. Detailed examples of two critical operating systems functions using the…
1986-07-01
COMPUTER-AIDED OPERATION MANAGEMENT SYSTEM ................. 29 Functions of an Off-Line Computer-Aided Operation Management System Applications of...System Comparisons 85 DISTRIBUTION 5V J. • 0. FIGURES Number Page 1 Hardware Components 21 2 Basic Functions of a Computer-Aided Operation Management System...Plant Visits 26 4 Computer-Aided Operation Management Systems Reviewed for Analysis of Basic Functions 29 5 Progress of Software System Installation and
NASA Astrophysics Data System (ADS)
Startsev, Sergey Ya.
2017-05-01
The paper is devoted to hyperbolic (generally speaking, non-Lagrangian and nonlinear) partial differential systems possessing a full set of differential operators that map any function of one independent variable into a symmetry of the corresponding system. We demonstrate that a system has the above property if and only if this system admits a full set of formal integrals (i.e., differential operators which map symmetries into integrals of the system). As a consequence, such systems possess both direct and inverse Noether operators (in the terminology of a work by B. Fuchssteiner and A.S. Fokas who have used these terms for operators that map cosymmetries into symmetries and perform transformations in the opposite direction). Systems admitting Noether operators are not exhausted by Euler-Lagrange systems and the systems with formal integrals. In particular, a hyperbolic system admits an inverse Noether operator if a differential substitution maps this system into a system possessing an inverse Noether operator.
Multiple operating system rotation environment moving target defense
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evans, Nathaniel; Thompson, Michael
Systems and methods for providing a multiple operating system rotation environment ("MORE") moving target defense ("MTD") computing system are described. The MORE-MTD system provides enhanced computer system security through a rotation of multiple operating systems. The MORE-MTD system increases attacker uncertainty, increases the cost of attacking the system, reduces the likelihood of an attacker locating a vulnerability, and reduces the exposure time of any located vulnerability. The MORE-MTD environment is effectuated by rotation of the operating systems at a given interval. The rotating operating systems create a consistently changing attack surface for remote attackers.
High-Performance Computing Systems and Operations | Computational Science |
NREL Systems and Operations High-Performance Computing Systems and Operations NREL operates high-performance computing (HPC) systems dedicated to advancing energy efficiency and renewable energy technologies. Capabilities NREL's HPC capabilities include: High-Performance Computing Systems We operate
Operational Characteristics of an Accelerator Driven Fissile Solution System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kimpland, Robert Herbert
Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the formmore » of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a “generic” Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system parameters, such as response times, will be quantified. A generalized linear systems analysis of steady-state operations will be performed to evaluate the level of stability of ADFS systems. This information should provide a basic understanding of typical ADFS system operational behavior, and facilitate the development of monitoring procedures and operator aids.« less
Automated Instructional Management Systems (AIMS) Version III, Operator's Guide.
ERIC Educational Resources Information Center
New York Inst. of Tech., Old Westbury.
This manual gives the instructions necessary to understand and operate the Automated Instructional Management System (AIMS), utilizing IBM System 360, Model 30/Release 20 Disk Operating System, and the OpScan 100 System Reader and Tape Unit. It covers the AIMS III system initialization, system and operational input, requirements, master response…
DOT National Transportation Integrated Search
1981-10-01
The objectives of the Systems Operation Studies (SOS) for automated guideway transit (AGT) systems are to develop models for the analysis of system operations, to evaluate performance and cost, and to establish guidelines for the design and operation...
49 CFR 234.205 - Operating characteristics of warning system apparatus.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Operating characteristics of warning system... Maintenance Standards § 234.205 Operating characteristics of warning system apparatus. Operating... system shall be maintained in accordance with the limits within which the system is designed to operate. ...
49 CFR 234.205 - Operating characteristics of warning system apparatus.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Operating characteristics of warning system... Maintenance Standards § 234.205 Operating characteristics of warning system apparatus. Operating... system shall be maintained in accordance with the limits within which the system is designed to operate. ...
49 CFR 234.205 - Operating characteristics of warning system apparatus.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Operating characteristics of warning system... Maintenance Standards § 234.205 Operating characteristics of warning system apparatus. Operating... system shall be maintained in accordance with the limits within which the system is designed to operate. ...
Transitioning to Integrated Modular Avionics with a Mission Management System
2000-10-01
software structure, which is based on the use of a of interchangeable processing modules of a limited COTS Real - Time Operating System . number of...open standardised interfaces system hardware or the Real - Time Operating System directly supports the use of COTS components, which implementation, to...System RTOS Real - Time Operating System SMBP System Management Blueprint Interface SMOS System Management to Operating System Interface Figure 2: The ASAAC
Cognitive engineering models in space systems
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1992-01-01
NASA space systems, including mission operations on the ground and in space, are complex, dynamic, predominantly automated systems in which the human operator is a supervisory controller. The human operator monitors and fine-tunes computer-based control systems and is responsible for ensuring safe and efficient system operation. In such systems, the potential consequences of human mistakes and errors may be very large, and low probability of such events is likely. Thus, models of cognitive functions in complex systems are needed to describe human performance and form the theoretical basis of operator workstation design, including displays, controls, and decision support aids. The operator function model represents normative operator behavior-expected operator activities given current system state. The extension of the theoretical structure of the operator function model and its application to NASA Johnson mission operations and space station applications is discussed.
Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu
2008-10-14
A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
OFMTutor: An operator function model intelligent tutoring system
NASA Technical Reports Server (NTRS)
Jones, Patricia M.
1989-01-01
The design, implementation, and evaluation of an Operator Function Model intelligent tutoring system (OFMTutor) is presented. OFMTutor is intended to provide intelligent tutoring in the context of complex dynamic systems for which an operator function model (OFM) can be constructed. The human operator's role in such complex, dynamic, and highly automated systems is that of a supervisory controller whose primary responsibilities are routine monitoring and fine-tuning of system parameters and occasional compensation for system abnormalities. The automated systems must support the human operator. One potentially useful form of support is the use of intelligent tutoring systems to teach the operator about the system and how to function within that system. Previous research on intelligent tutoring systems (ITS) is considered. The proposed design for OFMTutor is presented, and an experimental evaluation is described.
Autonomous Operations System: Development and Application
NASA Technical Reports Server (NTRS)
Toro Medina, Jaime A.; Wilkins, Kim N.; Walker, Mark; Stahl, Gerald M.
2016-01-01
Autonomous control systems provides the ability of self-governance beyond the conventional control system. As the complexity of mechanical and electrical systems increases, there develops a natural drive for developing robust control systems to manage complicated operations. By closing the bridge between conventional automated systems to knowledge based self-awareness systems, nominal control of operations can evolve into relying on safe critical mitigation processes to support any off-nominal behavior. Current research and development efforts lead by the Autonomous Propellant Loading (APL) group at NASA Kennedy Space Center aims to improve cryogenic propellant transfer operations by developing an automated control and health monitoring system. As an integrated systems, the center aims to produce an Autonomous Operations System (AOS) capable of integrating health management operations with automated control to produce a fully autonomous system.
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
Prognostic Analysis System and Methods of Operation
NASA Technical Reports Server (NTRS)
MacKey, Ryan M. E. (Inventor); Sneddon, Robert (Inventor)
2014-01-01
A prognostic analysis system and methods of operating the system are provided. In particular, a prognostic analysis system for the analysis of physical system health applicable to mechanical, electrical, chemical and optical systems and methods of operating the system are described herein.
NASA Astrophysics Data System (ADS)
Konishi, Hiroo; Takahashi, Choei; Kishibe, Hideto; Sato, Hiromichi
The stable operating power limits of a small scale HVDC system composed of voltage source converters (VSC-HVDC system) are analyzed with a simple model. The VSC-HVDC system could operate where the AC system must be somewhat larger in capacity than the VSC-HVDC system capacity. The stable operating power limits were between one and two times the SCR (short circuit ratio). When the inverter of the VSC-HVDC system was operated with lead reactive (capacitive) power control conditions, the stable operating limits were increased through AC voltage stabilization. When the inverter was a STATCOM operation, it could operate regardless of the SCR but regions within allowable AC voltage variations.
Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 3: Operations technology
NASA Technical Reports Server (NTRS)
Vilja, John O.
1990-01-01
The study was initiated to identify operational problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the OEPSS study were organized into a series of OEPSS Data Books. This volume describes operations technologies that will enhance operational efficiency of propulsion systems. A total of 15 operations technologies were identified that will eliminate or mitigate operations problems described in Volume 2. A recommended development plan is presented for eight promising technologies that will simplify the propulsion system and reduce operational requirements.
49 CFR 37.33 - Airport transportation systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems operated by public airport operators, which provide designated public transportation and connect.... Public airports which operate fixed route transportation systems are subject to the requirements of this... part. (b) Fixed-route transportation systems operated by public airport operators between the airport...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... Pachard Company, Business Critical Systems, Mission Critical Business Software Division, Openvms Operating... Business Software Division, Openvms Operating System Development Group, Including an Employee Operating Out... Company, Business Critical Systems, Mission Critical Business Software Division, OpenVMS Operating System...
Measurement of SIFT operating system overhead
NASA Technical Reports Server (NTRS)
Palumbo, D. L.; Butler, R. W.
1985-01-01
The overhead of the software implemented fault tolerance (SIFT) operating system was measured. Several versions of the operating system evolved. Each version represents different strategies employed to improve the measured performance. Three of these versions are analyzed. The internal data structures of the operating systems are discussed. The overhead of the SIFT operating system was found to be of two types: vote overhead and executive task overhead. Both types of overhead were found to be significant in all versions of the system. Improvements substantially reduced this overhead; even with these improvements, the operating system consumed well over 50% of the available processing time.
Implementation of NASTRAN on the IBM/370 CMS operating system
NASA Technical Reports Server (NTRS)
Britten, S. S.; Schumacker, B.
1980-01-01
The NASA Structural Analysis (NASTRAN) computer program is operational on the IBM 360/370 series computers. While execution of NASTRAN has been described and implemented under the virtual storage operating systems of the IBM 370 models, the IBM 370/168 computer can also operate in a time-sharing mode under the virtual machine operating system using the Conversational Monitor System (CMS) subset. The changes required to make NASTRAN operational under the CMS operating system are described.
Advanced Ground Systems Maintenance Physics Models For Diagnostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.
Multitasking operating systems for microprocessors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cramer, T.
1981-01-01
Microprocessors, because of their low cost, low power consumption, and small size, have caused an explosion in the number of innovative computer applications. Although there is a great deal of variation in microprocessor applications software, there is relatively little variation in the operating-system-level software from one application to the next. Nonetheless, operating system software, especially when multitasking is involved, can be very time consuming and expensive to develop. The major microprocessor manufacturers have acknowledged the need for operating systems in microprocessor applications and are now supplying real-time multitasking operating system software that is adaptable to a wide variety of usermore » systems. Use of this existing operating system software will decrease the number of redundant operating system development efforts, thus freeing programmers to work on more creative and productive problems. This paper discusses the basic terminology and concepts involved with multitasking operating systems. It is intended to provide a general understanding of the subject, so that the reader will be prepared to evaluate specific operating system software according to his or her needs. 2 references.« less
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
Characteristics of Operational Space Weather Forecasting: Observations and Models
NASA Astrophysics Data System (ADS)
Berger, Thomas; Viereck, Rodney; Singer, Howard; Onsager, Terry; Biesecker, Doug; Rutledge, Robert; Hill, Steven; Akmaev, Rashid; Milward, George; Fuller-Rowell, Tim
2015-04-01
In contrast to research observations, models and ground support systems, operational systems are characterized by real-time data streams and run schedules, with redundant backup systems for most elements of the system. We review the characteristics of operational space weather forecasting, concentrating on the key aspects of ground- and space-based observations that feed models of the coupled Sun-Earth system at the NOAA/Space Weather Prediction Center (SWPC). Building on the infrastructure of the National Weather Service, SWPC is working toward a fully operational system based on the GOES weather satellite system (constant real-time operation with back-up satellites), the newly launched DSCOVR satellite at L1 (constant real-time data network with AFSCN backup), and operational models of the heliosphere, magnetosphere, and ionosphere/thermosphere/mesophere systems run on the Weather and Climate Operational Super-computing System (WCOSS), one of the worlds largest and fastest operational computer systems that will be upgraded to a dual 2.5 Pflop system in 2016. We review plans for further operational space weather observing platforms being developed in the context of the Space Weather Operations Research and Mitigation (SWORM) task force in the Office of Science and Technology Policy (OSTP) at the White House. We also review the current operational model developments at SWPC, concentrating on the differences between the research codes and the modified real-time versions that must run with zero fault tolerance on the WCOSS systems. Understanding the characteristics and needs of the operational forecasting community is key to producing research into the coupled Sun-Earth system with maximal societal benefit.
NASA Technical Reports Server (NTRS)
Campbell, R. H.; Essick, Ray B.; Johnston, Gary; Kenny, Kevin; Russo, Vince
1987-01-01
Project EOS is studying the problems of building adaptable real-time embedded operating systems for the scientific missions of NASA. Choices (A Class Hierarchical Open Interface for Custom Embedded Systems) is an operating system designed and built by Project EOS to address the following specific issues: the software architecture for adaptable embedded parallel operating systems, the achievement of high-performance and real-time operation, the simplification of interprocess communications, the isolation of operating system mechanisms from one another, and the separation of mechanisms from policy decisions. Choices is written in C++ and runs on a ten processor Encore Multimax. The system is intended for use in constructing specialized computer applications and research on advanced operating system features including fault tolerance and parallelism.
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 25.961...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
14 CFR 25.672 - Stability augmentation and automatic and power-operated systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... power-operated systems. 25.672 Section 25.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 25.672 Stability augmentation and automatic and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
1987-09-01
real - time operating system should be efficient from the real-time point...5,8]) system naming scheme. 3.2 Protecting Objects Real-time embedded systems usually neglect protection mechanisms. However, a real - time operating system cannot...allocation mechanism should adhere to application constraints. This strong relationship between a real - time operating system and the application
ERIC Educational Resources Information Center
Mitchell, Christine M.; Govindaraj, T.
1990-01-01
Discusses the use of intelligent tutoring systems as opposed to traditional on-the-job training for training operators of complex dynamic systems and describes the computer architecture for a system for operators of a NASA (National Aeronautics and Space Administration) satellite control system. An experimental evaluation with college students is…
EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs
NASA Technical Reports Server (NTRS)
Cordier, Guy R.; Gomez-Rosa, Carlos; McLemore, Bruce D.
2007-01-01
The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.
49 CFR 1580.5 - Inspection authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
... railroad carrier that operates rolling equipment on track that is part of the general railroad system of... rail operator, whether operating on or off the general railroad system of transportation. (7) Each... railroad system of transportation. (8) Each operator of a rail transit system that is not operating on...
A Multiprocessor Operating System Simulator
NASA Technical Reports Server (NTRS)
Johnston, Gary M.; Campbell, Roy H.
1988-01-01
This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall semester of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT&T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows that of the 'Choices' family of operating systems for loosely- and tightly-coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.
NASA Astrophysics Data System (ADS)
Gorman, J.; Voshell, M.; Sliva, A.
2016-09-01
The United States is highly dependent on space resources to support military, government, commercial, and research activities. Satellites operate at great distances, observation capacity is limited, and operator actions and observations can be significantly delayed. Safe operations require support systems that provide situational understanding, enhance decision making, and facilitate collaboration between human operators and system automation both in-the-loop, and on-the-loop. Joint cognitive systems engineering (JCSE) provides a rich set of methods for analyzing and informing the design of complex systems that include both human decision-makers and autonomous elements as coordinating teammates. While, JCSE-based systems can enhance a system analysts' understanding of both existing and new system processes, JCSE activities typically occur outside of traditional systems engineering (SE) methods, providing sparse guidance about how systems should be implemented. In contrast, the Joint Director's Laboratory (JDL) information fusion model and extensions, such as the Dual Node Network (DNN) technical architecture, provide the means to divide and conquer such engineering and implementation complexity, but are loosely coupled to specialized organizational contexts and needs. We previously describe how Dual Node Decision Wheels (DNDW) extend the DNN to integrate JCSE analysis and design with the practicalities of system engineering and implementation using the DNN. Insights from Rasmussen's JCSE Decision Ladders align system implementation with organizational structures and processes. In the current work, we present a novel approach to assessing system performance based on patterns occurring in operational decisions that are documented by JCSE processes as traces in a decision ladder. In this way, system assessment is closely tied not just to system design, but the design of the joint cognitive system that includes human operators, decision-makers, information systems, and automated processes. Such operationally relevant and integrated testing provides a sound foundation for operator trust in system automation that is required to safely operate satellite systems.
NASA Technical Reports Server (NTRS)
Hill, Randall W., Jr.; Cooper, Lynne P.
1993-01-01
For complex operational systems, help needs to come from the inside out. It is often not realistic to call a help desk for problems that need immediate attention, especially for tasks that put a heavy cognitive load on the system operator. This session addresses the issues associated with providing electronic performance support for operational systems, including situations where the system is already fielded and can only change through evolution rather than revolution. We present a case study based on our experiences in developing the Link Monitor and Control Operator Assistant for NASA's Deep Space Network (DSN). The goals of the Operator Assistant are to improve the operability of the system and increase the efficiency of mission operations.
The embedded operating system project
NASA Technical Reports Server (NTRS)
Campbell, R. H.
1984-01-01
This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.
NASA Technical Reports Server (NTRS)
Fink, Wolfgang (Inventor); Dohm, James (Inventor); Tarbell, Mark A. (Inventor)
2010-01-01
A multi-agent autonomous system for exploration of hazardous or inaccessible locations. The multi-agent autonomous system includes simple surface-based agents or craft controlled by an airborne tracking and command system. The airborne tracking and command system includes an instrument suite used to image an operational area and any craft deployed within the operational area. The image data is used to identify the craft, targets for exploration, and obstacles in the operational area. The tracking and command system determines paths for the surface-based craft using the identified targets and obstacles and commands the craft using simple movement commands to move through the operational area to the targets while avoiding the obstacles. Each craft includes its own instrument suite to collect information about the operational area that is transmitted back to the tracking and command system. The tracking and command system may be further coupled to a satellite system to provide additional image information about the operational area and provide operational and location commands to the tracking and command system.
NASA Technical Reports Server (NTRS)
Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.
1990-01-01
The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.
UNIX-based operating systems robustness evaluation
NASA Technical Reports Server (NTRS)
Chang, Yu-Ming
1996-01-01
Robust operating systems are required for reliable computing. Techniques for robustness evaluation of operating systems not only enhance the understanding of the reliability of computer systems, but also provide valuable feed- back to system designers. This thesis presents results from robustness evaluation experiments on five UNIX-based operating systems, which include Digital Equipment's OSF/l, Hewlett Packard's HP-UX, Sun Microsystems' Solaris and SunOS, and Silicon Graphics' IRIX. Three sets of experiments were performed. The methodology for evaluation tested (1) the exception handling mechanism, (2) system resource management, and (3) system capacity under high workload stress. An exception generator was used to evaluate the exception handling mechanism of the operating systems. Results included exit status of the exception generator and the system state. Resource management techniques used by individual operating systems were tested using programs designed to usurp system resources such as physical memory and process slots. Finally, the workload stress testing evaluated the effect of the workload on system performance by running a synthetic workload and recording the response time of local and remote user requests. Moderate to severe performance degradations were observed on the systems under stress.
40 CFR 49.4164 - Construction and operational control measures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... closed-vent system to: (i) An operating system designed to recover and inject all the produced natural... through a closed-vent system to: (i) An operating system designed to recover and inject the natural gas... operating system designed to recover and inject natural gas becomes temporarily infeasible and there is no...
40 CFR 49.4164 - Construction and operational control measures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... closed-vent system to: (i) An operating system designed to recover and inject all the produced natural... through a closed-vent system to: (i) An operating system designed to recover and inject the natural gas... operating system designed to recover and inject natural gas becomes temporarily infeasible and there is no...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tian, Tian; Chernyakhovskiy, Ilya; Brancucci Martinez-Anido, Carlo
This document is the Spanish version of 'Greening the Grid- Forecasting Wind and Solar Generation Improving System Operations'. It discusses improving system operations with forecasting with and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.
Telerobotic workstation design aid
NASA Technical Reports Server (NTRS)
Corker, K.; Hudlicka, E.; Young, D.; Cramer, N.
1989-01-01
Telerobot systems are being developed to support a number of space mission applications. In low earth orbit, telerobots and teleoperated manipulators will be used in shuttle operations and space station construction/maintenance. Free flying telerobotic service vehicles will be used at low and geosynchronous orbital operations. Rovers and autonomous vehicles will be equipped with telerobotic devices in planetary exploration. In all of these systems, human operators will interact with the robot system at varied levels during the scheduled operations. The human operators may be in either orbital or ground-based control systems. To assure integrated system development and maximum utility across these systems, designers must be sensitive to the constraints and capabilities that the human brings to system operation and must be assisted in applying these human factors to system development. The simulation and analysis system is intended to serve the needs of system analysis/designers as an integrated workstation in support of telerobotic design.
ERIC Educational Resources Information Center
Denning, Peter J.; Brown, Robert L.
1984-01-01
A computer operating system spans multiple layers of complexity, from commands entered at a keyboard to the details of electronic switching. In addition, the system is organized as a hierarchy of abstractions. Various parts of such a system and system dynamics (using the Unix operating system as an example) are described. (JN)
14 CFR 415.127 - Flight safety system design and operation data.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Expendable Launch Vehicle From a Non-Federal Launch Site § 415.127 Flight safety system design and operation...: flight termination system; command control system; tracking; telemetry; communications; flight safety... control system. (7) Flight termination system component storage, operating, and service life. A listing of...
Modeling of the Human - Operator in a Complex System Functioning Under Extreme Conditions
NASA Astrophysics Data System (ADS)
Getzov, Peter; Hubenova, Zoia; Yordanov, Dimitar; Popov, Wiliam
2013-12-01
Problems, related to the explication of sophisticated control systems of objects, operating under extreme conditions, have been examined and the impact of the effectiveness of the operator's activity on the systems as a whole. The necessity of creation of complex simulation models, reflecting operator's activity, is discussed. Organizational and technical system of an unmanned aviation complex is described as a sophisticated ergatic system. Computer realization of main subsystems of algorithmic system of the man as a controlling system is implemented and specialized software for data processing and analysis is developed. An original computer model of a Man as a tracking system has been implemented. Model of unmanned complex for operators training and formation of a mental model in emergency situation, implemented in "matlab-simulink" environment, has been synthesized. As a unit of the control loop, the pilot (operator) is simplified viewed as an autocontrol system consisting of three main interconnected subsystems: sensitive organs (perception sensors); central nervous system; executive organs (muscles of the arms, legs, back). Theoretical-data model of prediction the level of operator's information load in ergatic systems is proposed. It allows the assessment and prediction of the effectiveness of a real working operator. Simulation model of operator's activity in takeoff based on the Petri nets has been synthesized.
From Operating-System Correctness to Pervasively Verified Applications
NASA Astrophysics Data System (ADS)
Daum, Matthias; Schirmer, Norbert W.; Schmidt, Mareike
Though program verification is known and has been used for decades, the verification of a complete computer system still remains a grand challenge. Part of this challenge is the interaction of application programs with the operating system, which is usually entrusted with retrieving input data from and transferring output data to peripheral devices. In this scenario, the correct operation of the applications inherently relies on operating-system correctness. Based on the formal correctness of our real-time operating system Olos, this paper describes an approach to pervasively verify applications running on top of the operating system.
Use of artificial intelligence in supervisory control
NASA Technical Reports Server (NTRS)
Cohen, Aaron; Erickson, Jon D.
1989-01-01
Viewgraphs describing the design and testing of an intelligent decision support system called OFMspert are presented. In this expert system, knowledge about the human operator is represented through an operator/system model referred to as the OFM (Operator Function Model). OFMspert uses the blackboard model of problem solving to maintain a dynamic representation of operator goals, plans, tasks, and actions given previous operator actions and current system state. Results of an experiment to assess OFMspert's intent inferencing capability are outlined. Finally, the overall design philosophy for an intelligent tutoring system (OFMTutor) for operators of complex dynamic systems is summarized.
Making adaptable systems work for mission operations: A case study
NASA Technical Reports Server (NTRS)
Holder, Barbara E.; Levesque, Michael E.
1993-01-01
The Advanced Multimission Operations System (AMMOS) at NASA's Jet Propulsion Laboratory is based on a highly adaptable multimission ground data system (MGDS) for mission operations. The goal for MGDS is to support current flight project science and engineering personnel and to meet the demands of future missions while reducing associated operations and software development costs. MGDS has become a powerful and flexible mission operations system by using a network of heterogeneous workstations, emerging open system standards, and selecting an adaptable tools-based architecture. Challenges in developing adaptable systems for mission operations and the benefits of this approach are described.
Operator Support System Design forthe Operation of RSG-GAS Research Reactor
NASA Astrophysics Data System (ADS)
Santoso, S.; Situmorang, J.; Bakhri, S.; Subekti, M.; Sunaryo, G. R.
2018-02-01
The components of RSG-GAS main control room are facing the problem of material ageing and technology obsolescence as well, and therefore the need for modernization and refurbishment are essential. The modernization in control room can be applied on the operator support system which bears the function in providing information for assisting the operator in conducting diagnosis and actions. The research purpose is to design an operator support system for RSG-GAS control room. The design was developed based on the operator requirement in conducting task operation scenarios and the reactor operation characteristics. These scenarios include power operation, low power operation and shutdown/scram reactor. The operator support system design is presented in a single computer display which contains structure and support system elements e.g. operation procedure, status of safety related components and operational requirements, operation limit condition of parameters, alarm information, and prognosis function. The prototype was developed using LabView software and consisted of components structure and features of the operator support system. Information of each component in the operator support system need to be completed before it can be applied and integrated in the RSG-GAS main control room.
Extended System Operations Studies for Automated Guideway Transit Systems
DOT National Transportation Integrated Search
1982-02-01
The objectives of the System Operations Studies (SOS) of the Automated Guideway Transit Technology (AGTT) program was to develop models for the analysis of system operations, to evaluate AGT system performance and cost, and to establish guidelines fo...
Comparing Two Tools for Mobile-Device Forensics
2017-09-01
baseline standard. 2.4 Mobile Operating Systems "A mobile operating system is an operating system that is specifically designed to run on mobile devices... run on mobile devices" [7]. There are many different types of mobile operating systems and they are constantly changing, which means an operating...to this is that the security features make forensic analysis more difficult [11]. 2.4.2 iPhone "The iPhone runs an operating system called iOS. It is a
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1990-01-01
The design, implementation, and empirical evaluation of task-analytic models and intelligent aids for operators in the control of complex dynamic systems, specifically aerospace systems, are studied. Three related activities are included: (1) the models of operator decision making in complex and predominantly automated space systems were used and developed; (2) the Operator Function Model (OFM) was used to represent operator activities; and (3) Operator Function Model Expert System (OFMspert), a stand-alone knowledge-based system was developed, that interacts with a human operator in a manner similar to a human assistant in the control of aerospace systems. OFMspert is an architecture for an operator's assistant that uses the OFM as its system and operator knowledge base and a blackboard paradigm of problem solving to dynamically generate expectations about upcoming operator activities and interpreting actual operator actions. An experiment validated the OFMspert's intent inferencing capability and showed that it inferred the intentions of operators in ways comparable to both a human expert and operators themselves. OFMspert was also augmented with control capabilities. An interface allowed the operator to interact with OFMspert, delegating as much or as little control responsibility as the operator chose. With its design based on the OFM, OFMspert's control capabilities were available at multiple levels of abstraction and allowed the operator a great deal of discretion over the amount and level of delegated control. An experiment showed that overall system performance was comparable for teams consisting of two human operators versus a human operator and OFMspert team.
Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…
Clearing a Path: The 16-Bit Operating System Jungle Offers Confusion, Not Standardization.
ERIC Educational Resources Information Center
Pournelle, Jerry
1984-01-01
Discusses the design and limited uses of the Pascal, MS-DOS, CP/M, and PC-DOS operating systems as standard operating systems for 16-bit microprocessors, especially with the more sophisticated microcomputers currently being developed. Advantages and disadvantages of Unix--a multitasking, multiuser operating system--as a standard operating system…
49 CFR 1544.211 - Use of X-ray systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 9 2012-10-01 2012-10-01 false Use of X-ray systems. 1544.211 Section 1544.211... COMMERCIAL OPERATORS Operations § 1544.211 Use of X-ray systems. (a) TSA authorization required. No aircraft operator may use any X-ray system within the United States or under the aircraft operator's operational...
A Comprehensive Comparison of Current Operating Reserve Methodologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Ibanez, Eduardo; Gao, Wenzhong
Electric power systems are currently experiencing a paradigm shift from a traditionally static system to a system that is becoming increasingly more dynamic and variable. Emerging technologies are forcing power system operators to adapt to their performance characteristics. These technologies, such as distributed generation and energy storage systems, have changed the traditional idea of a distribution system with power flowing in one direction into a distribution system with bidirectional flows. Variable generation, in the form of wind and solar generation, also increases the variability and uncertainty in the system. As such, power system operators are revisiting the ways in whichmore » they treat this evolving power system, namely by modifying their operating reserve methodologies. This paper intends to show an in-depth analysis on different operating reserve methodologies and investigate their impacts on power system reliability and economic efficiency.« less
2000-10-01
control systems and prototyped the approach by porting the ILU ORB from Xerox to the Lynx real - time operating system . They then provided a distributed...compliant real - time operating system , a real-time ORB, and an ODMG-compliant real-time ODBMS [12]. The MITRE system is an infrastructure for...the server’s local operating system can handle. For instance, on a node controlled by the VXWorks real - time operating system with 256 local
A Framework for Enterprise Operating Systems Based on Zachman Framework
NASA Astrophysics Data System (ADS)
Ostadzadeh, S. Shervin; Rahmani, Amir Masoud
Nowadays, the Operating System (OS) isn't only the software that runs your computer. In the typical information-driven organization, the operating system is part of a much larger platform for applications and data that extends across the LAN, WAN and Internet. An OS cannot be an island unto itself; it must work with the rest of the enterprise. Enterprise wide applications require an Enterprise Operating System (EOS). Enterprise operating systems used in an enterprise have brought about an inevitable tendency to lunge towards organizing their information activities in a comprehensive way. In this respect, Enterprise Architecture (EA) has proven to be the leading option for development and maintenance of enterprise operating systems. EA clearly provides a thorough outline of the whole information system comprising an enterprise. To establish such an outline, a logical framework needs to be laid upon the entire information system. Zachman Framework (ZF) has been widely accepted as a standard scheme for identifying and organizing descriptive representations that have prominent roles in enterprise-wide system development. In this paper, we propose a framework based on ZF for enterprise operating systems. The presented framework helps developers to design and justify completely integrated business, IT systems, and operating systems which results in improved project success rate.
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 29.961...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
Third International Symposium on Space Mission Operations and Ground Data Systems, part 2
NASA Technical Reports Server (NTRS)
Rash, James L. (Editor)
1994-01-01
Under the theme of 'Opportunities in Ground Data Systems for High Efficiency Operations of Space Missions,' the SpaceOps '94 symposium included presentations of more than 150 technical papers spanning five topic areas: Mission Management, Operations, Data Management, System Development, and Systems Engineering. The symposium papers focus on improvements in the efficiency, effectiveness, and quality of data acquisition, ground systems, and mission operations. New technology, methods, and human systems are discussed. Accomplishments are also reported in the application of information systems to improve data retrieval, reporting, and archiving; the management of human factors; the use of telescience and teleoperations; and the design and implementation of logistics support for mission operations. This volume covers expert systems, systems development tools and approaches, and systems engineering issues.
A Network Architecture for Data-Driven Systems
1985-07-01
ELABORATION. ..... ..... 26 Real - Time Operating System . ....... ......... 26 Secondary Memory Utilization. ........ ....... 26 Data Flow Graphical...discussions followed by a flight simulator exam~ple. REAL - TIME OPERATING SYSTEM An operating system needs to be designed exclusively for real-time...Assessment. (SDWA) module. The SDWA module is tightly coupled to the real - time operating system . This module must determine the sensitivity to
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
Deepen the Teaching Reform of Operating System, Cultivate the Comprehensive Quality of Students
ERIC Educational Resources Information Center
Liu, Jianjun
2010-01-01
Operating system is the core course of the specialty of computer science and technology. To understand and master the operating system will directly affect students' further study on other courses. The course of operating system focuses more on theories. Its contents are more abstract and the knowledge system is more complicated. Therefore,…
Building a computer-aided design capability using a standard time share operating system
NASA Technical Reports Server (NTRS)
Sobieszczanski, J.
1975-01-01
The paper describes how an integrated system of engineering computer programs can be built using a standard commercially available operating system. The discussion opens with an outline of the auxiliary functions that an operating system can perform for a team of engineers involved in a large and complex task. An example of a specific integrated system is provided to explain how the standard operating system features can be used to organize the programs into a simple and inexpensive but effective system. Applications to an aircraft structural design study are discussed to illustrate the use of an integrated system as a flexible and efficient engineering tool. The discussion concludes with an engineer's assessment of an operating system's capabilities and desirable improvements.
75 FR 11161 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... Generator Interconnection Agreement among SES Solar One, LLC et al. Filed Date: 02/25/2010. Accession Number... System Operator Inc. Description: New York Independent System Operator, Inc submits proposed revisions to... Independent Transmission System Operator Inc. Description: Midwest Independent Transmission System Operator...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Reports Required To Be Made by Operators of Credit Card Systems § 1028.300 General. Operators of credit card systems are... contained in that subpart which apply to operators of credit card systems. ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Reports Required To Be Made by Operators of Credit Card Systems § 1028.300 General. Operators of credit card systems are... contained in that subpart which apply to operators of credit card systems. ...
Expert operator's associate: A knowledge based system for spacecraft control
NASA Technical Reports Server (NTRS)
Nielsen, Mogens; Grue, Klaus; Lecouat, Francois
1991-01-01
The Expert Operator's Associate (EOA) project is presented which studies the applicability of expert systems for day-to-day space operations. A prototype expert system is developed, which operates on-line with an existing spacecraft control system at the European Space Operations Centre, and functions as an 'operator's assistant' in controlling satellites. The prototype is demonstrated using an existing real-time simulation model of the MARECS-B2 telecommunication satellite. By developing a prototype system, the extent to which reliability and effectivens of operations can be enhanced by AI based support is examined. In addition the study examines the questions of acquisition and representation of the 'knowledge' for such systems, and the feasibility of 'migration' of some (currently) ground-based functions into future spaceborne autonomous systems.
Advanced Hard Real-Time Operating System, the Maruti Project. Part 2.
1997-01-01
Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s...The maruti hard real - time " operating system . A CM SIGOPS, Operating Systems Review. 23:90-106, July 1989. 254 !1 110) C. L. Liu and J. Layland...February 14, 1995 Abstract The Maruti Real - Time Operating System was developed for applications that must meet hard real-time constraints. In order
Yamamoto, K; Ogura, H; Furutani, H; Kitazoe, Y; Takeda, Y; Hirakawa, M
1986-01-01
A computer system operation is introduced, which has been in use since October 1981 at Kochi medical school as one of the integral sub-systems of the total hospital information system called IMIS. The system was designed from the beginning with the main purposes of obtaining better management of operations, and detailed medical records are included for before, during and after operations. It is shown that almost all operations except emergencies were managed using the computer system rather than the paper system. After presenting some of the results of the accumulated records we will discuss the reason for this high frequency of use of the computer system.
The embedded operating system project
NASA Technical Reports Server (NTRS)
Campbell, R. H.
1985-01-01
The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.
Code of Federal Regulations, 2011 CFR
2011-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop delivery system...
Code of Federal Regulations, 2010 CFR
2010-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop delivery system...
14 CFR 417.405 - Ground safety analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... hazard from affecting the public. A launch operator must incorporate the launch site operator's systems... personnel who are knowledgeable of launch vehicle systems, launch processing, ground systems, operations...) Begin a ground safety analysis by identifying the systems and operations to be analyzed; (2) Define the...
14 CFR 417.405 - Ground safety analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... hazard from affecting the public. A launch operator must incorporate the launch site operator's systems... personnel who are knowledgeable of launch vehicle systems, launch processing, ground systems, operations...) Begin a ground safety analysis by identifying the systems and operations to be analyzed; (2) Define the...
A multiprocessor operating system simulator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnston, G.M.; Campbell, R.H.
1988-01-01
This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT and T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows thatmore » of the Choices family of operating systems for loosely and tightly coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.« less
An Investigation into Soft Error Detection Efficiency at Operating System Level
Taheri, Hassan
2014-01-01
Electronic equipment operating in harsh environments such as space is subjected to a range of threats. The most important of these is radiation that gives rise to permanent and transient errors on microelectronic components. The occurrence rate of transient errors is significantly more than permanent errors. The transient errors, or soft errors, emerge in two formats: control flow errors (CFEs) and data errors. Valuable research results have already appeared in literature at hardware and software levels for their alleviation. However, there is the basic assumption behind these works that the operating system is reliable and the focus is on other system levels. In this paper, we investigate the effects of soft errors on the operating system components and compare their vulnerability with that of application level components. Results show that soft errors in operating system components affect both operating system and application level components. Therefore, by providing endurance to operating system level components against soft errors, both operating system and application level components gain tolerance. PMID:24574894
An investigation into soft error detection efficiency at operating system level.
Asghari, Seyyed Amir; Kaynak, Okyay; Taheri, Hassan
2014-01-01
Electronic equipment operating in harsh environments such as space is subjected to a range of threats. The most important of these is radiation that gives rise to permanent and transient errors on microelectronic components. The occurrence rate of transient errors is significantly more than permanent errors. The transient errors, or soft errors, emerge in two formats: control flow errors (CFEs) and data errors. Valuable research results have already appeared in literature at hardware and software levels for their alleviation. However, there is the basic assumption behind these works that the operating system is reliable and the focus is on other system levels. In this paper, we investigate the effects of soft errors on the operating system components and compare their vulnerability with that of application level components. Results show that soft errors in operating system components affect both operating system and application level components. Therefore, by providing endurance to operating system level components against soft errors, both operating system and application level components gain tolerance.
Data Telemetry and Acquisition System for Acoustic Signal Processing Investigations.
1996-02-20
were VME- based computer systems operating under the VxWorks real - time operating system . Each system shared a common hardware and software... real - time operating system . It interfaces to the Berg PCM Decommutator board, which searches for the embedded synchronization word in the data and re...software were built on top of this architecture. The multi-tasking, message queue and memory management facilities of the VxWorks real - time operating system are
System Shock: The Archetype of Operational Shock
2017-05-25
System Shock: The Archetype of Operational Shock A Monograph by MAJ Benjamen A. McDaniel United States Army School of Advanced Military...Mongraphs 3. DATES COVERED (From - To) JUN 2016- MAY 2017 4. TITLE AND SUBTITLE System Shock: The Archetype of Operational Shock 5a. CONTRACT NUMBER...is whether the US can use the concept of ‘ system shock’ to better operate in the Grey Zone. ‘ System shock’ combines ideas from systems theory, chaos
Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.3556 Section 63... system and add-on control device operating limits during the performance test? During the performance... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Power boost and power-operated control...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Power boost and power-operated control...
Code of Federal Regulations, 2013 CFR
2013-07-01
... system and add-on control device operating limits during the performance test? 63.3546 Section 63.3546... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.3546 Section 63... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Power boost and power-operated control...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Power boost and power-operated control...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.3546 Section 63... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Power boost and power-operated control...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.3556 Section 63... system and add-on control device operating limits during the performance test? During the performance... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Power boost and power-operated control...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...
[Computerized monitoring system in the operating center with UNIX and X-window].
Tanaka, Y; Hashimoto, S; Chihara, E; Kinoshita, T; Hirose, M; Nakagawa, M; Murakami, T
1992-01-01
We previously reported the fully automated data logging system in the operating center. Presently, we revised the system using a highly integrated operating system, UNIX instead of OS/9. With this multi-task and multi-window (X-window) system, we could monitor all 12 rooms in the operating center at a time. The system in the operating center consists of 2 computers, SONY NEWS1450 (UNIX workstation) and Sord M223 (CP/M, data logger). On the bitmapped display of the workstation, using X-window, the data of all the operating rooms can be visualized. Furthermore, 2 other minicomputers (Fujitsu A50 in the conference room, and A60 in the ICU) and a workstation (Sun3-80 in the ICU) were connected with ethernet. With the remote login function (NFS), we could easily obtain the data during the operation from outside the operating center. This system works automatically and needs no routine maintenance.
A support architecture for reliable distributed computing systems
NASA Technical Reports Server (NTRS)
Dasgupta, Partha; Leblanc, Richard J., Jr.
1988-01-01
The Clouds project is well underway to its goal of building a unified distributed operating system supporting the object model. The operating system design uses the object concept of structuring software at all levels of the system. The basic operating system was developed and work is under progress to build a usable system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2012 CFR
2012-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2013 CFR
2013-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2014 CFR
2014-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2011 CFR
2011-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Engineering Elegant Systems: Postulates, Principles, and Hypotheses of Systems Engineering
NASA Technical Reports Server (NTRS)
Watson, Michael D.
2018-01-01
Definition: System Engineering is the engineering discipline which integrates the system functions, system environment, and the engineering disciplines necessary to produce and/or operate an elegant system; Elegant System - A system that is robust in application, fully meeting specified and adumbrated intent, is well structured, and is graceful in operation. Primary Focus: System Design and Integration: Identify system couplings and interactions; Identify system uncertainties and sensitivities; Identify emergent properties; Manage the effectiveness of the system. Engineering Discipline Integration: Manage flow of information for system development and/or operations; Maintain system activities within budget and schedule. Supporting Activities: Process application and execution.
A Study on the Deriving Requirements of ARGO Operation System
NASA Astrophysics Data System (ADS)
Seo, Yoon-Kyung; Rew, Dong-Young; Lim, Hyung-Chul; Park, In-Kwan; Yim, Hong-Suh; Jo, Jung Hyun; Park, Jong-Uk
2009-12-01
Korea Astronomy and Space Science Institute (KASI) has been developing one mobile and one stationary SLR system since 2008 named as ARGO-M and ARGO-F, respectively. KASI finished the step of deriving the system requirements of ARGO. The requirements include definitions and scopes of various software and hardware components which are necessary for developing the ARGO-M operation system. And the requirements define function, performance, and interface requirements. The operation system consisting of ARGO-M site, ARGO-F site, and Remote Operation Center (ROC) inside KASI is designed for remote access and the automatic tracking and control system which are the main operation concept of ARGO system. To accomplish remote operation, we are considering remote access to ARGO-F and ARGO-M from ROC. The mobile-phone service allows us to access the ARGO-F remotely and to control the system in an emergency. To implement fully automatic tracking and control function in ARGO-F, we have investigated and described the requirements about the automatic aircraft detection system and the various meteorological sensors. This paper addresses the requirements of ARGO Operation System.
Advanced optical blade tip clearance measurement system
NASA Technical Reports Server (NTRS)
Ford, M. J.; Honeycutt, R. E.; Nordlund, R. E.; Robinson, W. W.
1978-01-01
An advanced electro-optical system was developed to measure single blade tip clearances and average blade tip clearances between a rotor and its gas path seal in an operating gas turbine engine. This system is applicable to fan, compressor, and turbine blade tip clearance measurement requirements, and the system probe is particularly suitable for operation in the extreme turbine environment. A study of optical properties of blade tips was conducted to establish measurement system application limitations. A series of laboratory tests was conducted to determine the measurement system's operational performance characteristics and to demonstrate system capability under simulated operating gas turbine environmental conditions. Operational and environmental performance test data are presented.
An expert system to manage the operation of the Space Shuttle's fuel cell cryogenic reactant tanks
NASA Technical Reports Server (NTRS)
Murphey, Amy Y.
1990-01-01
This paper describes a rule-based expert system to manage the operation of the Space Shuttle's cryogenic fuel system. Rules are based on standard fuel tank operating procedures described in the EECOM Console Handbook. The problem of configuring the operation of the Space Shuttle's fuel tanks is well-bounded and well defined. Moreover, the solution of this problem can be encoded in a knowledge-based system. Therefore, a rule-based expert system is the appropriate paradigm. Furthermore, the expert system could be used in coordination with power system simulation software to design operating procedures for specific missions.
NASA Technical Reports Server (NTRS)
Dietz, J. B.
1976-01-01
A flash evaporator heat rejection system representative of that proposed for the space shuttle orbiter underwent extensive system testing at the NASA Johnson Space Center (JSC) to determine its operational suitability and to establish system performance/operational characteristics for use in the shuttle system. During the tests the evaporator system demonstrated its suitability to meet the shuttle requirements by: (1) efficient operation with 90 to 95% water evaporation efficiency, (2) control of outlet temperature to 40 + or - 2 F for partial heat load operation, (3) stability of control system for rapid changes in Freon inlet temperature, and (4) repeated dormant-to-active device operation without any startup procedures.
Measurement and analysis of operating system fault tolerance
NASA Technical Reports Server (NTRS)
Lee, I.; Tang, D.; Iyer, R. K.
1992-01-01
This paper demonstrates a methodology to model and evaluate the fault tolerance characteristics of operational software. The methodology is illustrated through case studies on three different operating systems: the Tandem GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Measurements are made on these systems for substantial periods to collect software error and recovery data. In addition to investigating basic dependability characteristics such as major software problems and error distributions, we develop two levels of models to describe error and recovery processes inside an operating system and on multiple instances of an operating system running in a distributed environment. Based on the models, reward analysis is conducted to evaluate the loss of service due to software errors and the effect of the fault-tolerance techniques implemented in the systems. Software error correlation in multicomputer systems is also investigated.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-01
... Packard Company Business Critical Systems, Mission Critical Business Software Division, OpenVMS Operating... Software Division, OpenVMS Operating System Development Group, Including an Employee Operating Out of the..., Mission Critical Business Software Division, OpenVMS Operating System Development Group, including...
14 CFR 29.683 - Operation tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free...
14 CFR 27.683 - Operation tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free from...
1991-10-01
Real - Time Operating System , Hide Tokuda, et al., Carnegie Mellon University "* MARUTI, Hard Real - Time Operating System , Ashok...Architecture, Fred J. Pollack and Kevin C. Kahn, BiiN 10:00 - 10:20 BREAK 10:20 - 12:20 Session VII - Chair: James G. Smith, ONR • A Real - Time Operating System for...Detailed Description * POSIX: Detailed Description * V: Detailed Description * Real - Time Operating System
Methodology for Designing Operational Banking Risks Monitoring System
NASA Astrophysics Data System (ADS)
Kostjunina, T. N.
2018-05-01
The research looks at principles of designing an information system for monitoring operational banking risks. A proposed design methodology enables one to automate processes of collecting data on information security incidents in the banking network, serving as the basis for an integrated approach to the creation of an operational risk management system. The system can operate remotely ensuring tracking and forecasting of various operational events in the bank network. A structure of a content management system is described.
Cognitive Systems Modeling and Analysis of Command and Control Systems
NASA Technical Reports Server (NTRS)
Norlander, Arne
2012-01-01
Military operations, counter-terrorism operations and emergency response often oblige operators and commanders to operate within distributed organizations and systems for safe and effective mission accomplishment. Tactical commanders and operators frequently encounter violent threats and critical demands on cognitive capacity and reaction time. In the future they will make decisions in situations where operational and system characteristics are highly dynamic and non-linear, i.e. minor events, decisions or actions may have serious and irreversible consequences for the entire mission. Commanders and other decision makers must manage true real time properties at all levels; individual operators, stand-alone technical systems, higher-order integrated human-machine systems and joint operations forces alike. Coping with these conditions in performance assessment, system development and operational testing is a challenge for both practitioners and researchers. This paper reports on research from which the results led to a breakthrough: An integrated approach to information-centered systems analysis to support future command and control systems research development. This approach integrates several areas of research into a coherent framework, Action Control Theory (ACT). It comprises measurement techniques and methodological advances that facilitate a more accurate and deeper understanding of the operational environment, its agents, actors and effectors, generating new and updated models. This in turn generates theoretical advances. Some good examples of successful approaches are found in the research areas of cognitive systems engineering, systems theory, and psychophysiology, and in the fields of dynamic, distributed decision making and naturalistic decision making.
Ji, Hyerim; Yoo, Sooyoung; Heo, Eun-Young; Hwang, Hee; Kim, Jeong-Whun
2017-10-01
This study aimed to identify problems and issues that arise with the implementation of online health information exchange (HIE) systems in a medical environment and to identify solutions to facilitate the successful operation of future HIE systems in primary care clinics and hospitals. In this study, the issues that arose during the establishment and operation of an HIE system in a hospital were identified so that they could be addressed to enable the successful establishment and operation of a standard-based HIE system. After the issues were identified, they were reviewed and categorized by a group of experts that included medical information system experts, doctors, medical information standard experts, and HIE researchers. Then, solutions for the identified problems were derived based on the system development, operation, and improvement carried out during this work. Twenty-one issues were identified during the implementation and operation of an online HIE system. These issues were then divided into four categories: system architecture and standards, documents and data items, consent of HIE, and usability. We offer technical and policy recommendations for various stakeholders based on the experiences of operating and improving the online HIE system in the medical field. The issues and solutions identified in this study regarding the implementation and operate of an online HIE system can provide valuable insight for planners to enable them to successfully design and operate such systems at a national level in the future. In addition, policy support from governments is needed.
Stochastic availability analysis of operational data systems in the Deep Space Network
NASA Technical Reports Server (NTRS)
Issa, T. N.
1991-01-01
Existing availability models of standby redundant systems consider only an operator's performance and its interaction with the hardware performance. In the case of operational data systems in the Deep Space Network (DSN), in addition to an operator system interface, a controller reconfigures the system and links a standby unit into the network data path upon failure of the operating unit. A stochastic (Markovian) process technique is used to model and analyze the availability performance and occurrence of degradation due to partial failures are quantitatively incorporated into the model. Exact expressions of the steady state availability and proportion degraded performance measures are derived for the systems under study. The interaction among the hardware, operator, and controller performance parameters and that interaction's effect on data availability are evaluated and illustrated for an operational data processing system.
Achieving Operability via the Mission System Paradigm
NASA Technical Reports Server (NTRS)
Hammer, Fred J.; Kahr, Joseph R.
2006-01-01
In the past, flight and ground systems have been developed largely-independently, with the flight system taking the lead, and dominating the development process. Operability issues have been addressed poorly in planning, requirements, design, I&T, and system-contracting activities. In many cases, as documented in lessons-learned, this has resulted in significant avoidable increases in cost and risk. With complex missions and systems, operability is being recognized as an important end-to-end design issue. Never-the-less, lessons-learned and operability concepts remain, in many cases, poorly understood and sporadically applied. A key to effective application of operability concepts is adopting a 'mission system' paradigm. In this paradigm, flight and ground systems are treated, from an engineering and management perspective, as inter-related elements of a larger mission system. The mission system consists of flight hardware, flight software, telecom services, ground data system, testbeds, flight teams, science teams, flight operations processes, procedures, and facilities. The system is designed in functional layers, which span flight and ground. It is designed in response to project-level requirements, mission design and an operations concept, and is developed incrementally, with early and frequent integration of flight and ground components.
Space-based solar power conversion and delivery systems (study), engineering analysis
NASA Technical Reports Server (NTRS)
Nathan, C. A.
1975-01-01
A systems analysis of synchronous, orbit-based power generation and relay systems that could be operational in the 1990's is described along with a comparison with earth-based systems to be operational in the same time frame. Operational and economic requirements for the orbiting systems and near term research activities which will be required to assure feasibility, development, launch and operational capabilities of such systems in the post- 1990 time frame are examined.
49 CFR 236.504 - Operation interconnected with automatic block-signal system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Operation interconnected with automatic block... Operation interconnected with automatic block-signal system. (a) A continuous inductive automatic train stop or train control system shall operate in connection with an automatic block signal system and shall...
46 CFR 184.610 - Public address systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... public address system must be a fixed installation and be audible during normal operating conditions... system operable from the operating station. (d) On a vessel of not more than 19.8 meters (65 feet) in... passengers, a public address system is not required if a public announcement made from operating station...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
Systems and Algorithms for Automated Collaborative Observation Using Networked Robotic Cameras
ERIC Educational Resources Information Center
Xu, Yiliang
2011-01-01
The development of telerobotic systems has evolved from Single Operator Single Robot (SOSR) systems to Multiple Operator Multiple Robot (MOMR) systems. The relationship between human operators and robots follows the master-slave control architecture and the requests for controlling robot actuation are completely generated by human operators. …
NASA Technical Reports Server (NTRS)
1993-01-01
The Second International Symposium featured 135 oral presentations in these 12 categories: Future Missions and Operations; System-Level Architectures; Mission-Specific Systems; Mission and Science Planning and Sequencing; Mission Control; Operations Automation and Emerging Technologies; Data Acquisition; Navigation; Operations Support Services; Engineering Data Analysis of Space Vehicle and Ground Systems; Telemetry Processing, Mission Data Management, and Data Archiving; and Operations Management. Topics focused on improvements in the productivity, effectiveness, efficiency, and quality of mission operations, ground systems, and data acquisition. Also emphasized were accomplishments in management of human factors; use of information systems to improve data retrieval, reporting, and archiving; design and implementation of logistics support for mission operations; and the use of telescience and teleoperations.
Terminal-area STOL operating systems experiments program
NASA Technical Reports Server (NTRS)
Smith, D. W.; Watson, D.; Christensen, J. V.
1973-01-01
Information which will aid in the choice by the U.S. Government and industry of system concepts, design criteria, operating procedures for STOL aircraft and STOL ports, STOL landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. Ames has developed a terminal-area STOL operating systems experiments program which is a part of the joint DOT/NASA effort is discussed. The Ames operating systems experiments program, its objectives, the program approach, the program schedule, typical experiments, the research facilities to be used, and the program status are described.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... ceasing operations of XLE, the Exchange has solely operated an options market. The System will allow PSX..., Display and Execution The System will operate, and orders can be entered into the System, from 9 a.m. to 5... satisfies this requirement. \\63\\ In considering the operation of automated execution systems operated by an...
Code of Federal Regulations, 2014 CFR
2014-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2013 CFR
2013-10-01
... public entities operating fixed route systems. 37.71 Section 37.71 Transportation Office of the Secretary... operating fixed route systems. (a) Each public entity operating a fixed route system making a solicitation after August 25, 1990, to purchase or lease a new bus or other new vehicle for use on the system, shall...
Code of Federal Regulations, 2012 CFR
2012-10-01
... public entities operating fixed route systems. 37.71 Section 37.71 Transportation Office of the Secretary... operating fixed route systems. (a) Each public entity operating a fixed route system making a solicitation after August 25, 1990, to purchase or lease a new bus or other new vehicle for use on the system, shall...
Code of Federal Regulations, 2014 CFR
2014-10-01
... public entities operating fixed route systems. 37.71 Section 37.71 Transportation Office of the Secretary... operating fixed route systems. (a) Each public entity operating a fixed route system making a solicitation after August 25, 1990, to purchase or lease a new bus or other new vehicle for use on the system, shall...
Code of Federal Regulations, 2010 CFR
2010-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Advanced Ground Systems Maintenance Physics Models for Diagnostics Project
NASA Technical Reports Server (NTRS)
Harp, Janicce Leshay
2014-01-01
The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations.
Utilization of Internet Protocol-Based Voice Systems in Remote Payload Operations
NASA Technical Reports Server (NTRS)
Best, Susan; Nichols, Kelvin; Bradford, Robert
2003-01-01
This viewgraph presentation provides an overview of a proposed voice communication system for use in remote payload operations performed on the International Space Station. The system, Internet Voice Distribution System (IVoDS), would make use of existing Internet protocols, and offer a number of advantages over the system currently in use. Topics covered include: system description and operation, system software and hardware, system architecture, project status, and technology transfer applications.
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
Automatic Learning of Fine Operating Rules for Online Power System Security Control.
Sun, Hongbin; Zhao, Feng; Wang, Hao; Wang, Kang; Jiang, Weiyong; Guo, Qinglai; Zhang, Boming; Wehenkel, Louis
2016-08-01
Fine operating rules for security control and an automatic system for their online discovery were developed to adapt to the development of smart grids. The automatic system uses the real-time system state to determine critical flowgates, and then a continuation power flow-based security analysis is used to compute the initial transfer capability of critical flowgates. Next, the system applies the Monte Carlo simulations to expected short-term operating condition changes, feature selection, and a linear least squares fitting of the fine operating rules. The proposed system was validated both on an academic test system and on a provincial power system in China. The results indicated that the derived rules provide accuracy and good interpretability and are suitable for real-time power system security control. The use of high-performance computing systems enables these fine operating rules to be refreshed online every 15 min.
NASA Technical Reports Server (NTRS)
Ziese, James M.
1992-01-01
A design tool of figure of merit was developed that allows the operability of a propulsion system design to be measured. This Launch Operations Index (LOI) relates Operations Efficiency to System Complexity. The figure of Merit can be used by conceptual designers to compare different propulsion system designs based on their impact on launch operations. The LOI will improve the design process by making sure direct launch operations experience is a necessary feedback to the design process.
Analysis of the human operator subsystems
NASA Technical Reports Server (NTRS)
Jones, Lynette A.; Hunter, Ian W.
1991-01-01
Except in low-bandwidth systems, knowledge of the human operator transfer function is essential for high-performance telerobotic systems. This information has usually been derived from detailed analyses of tracking performance, in which the human operator is considered as a complete system rather than as a summation of a number of subsystems, each of which influences the operator's output. Studies of one of these subsystems, the limb mechanics system, demonstrate that large parameter variations can occur that can have a profound effect on the stability of force-reflecting telerobot systems. An objective of this research was to decompose the performance of the human operator system in order to establish how the dynamics of each of the elements influence the operator's responses.
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
Systems Integration Challenges for a National Space Launch System
NASA Technical Reports Server (NTRS)
May, Todd A.
2011-01-01
System Integration was refined through the complexity and early failures experienced in rocket flight. System Integration encompasses many different viewpoints of the system development. System Integration must ensure consistency in development and operations activities. Human Space Flight tends toward large, complex systems. Understanding the system fs operational and use context is the guiding principle for System Integration: (1) Sizeable costs can be driven into systems by not fully understanding context (2). Adhering to the system context throughout the system fs life cycle is essential to maintaining efficient System Integration. System Integration exists within the System Architecture. Beautiful systems are simple in use and operation -- Block upgrades facilitate manageable steps in functionality evolution. Effective System Integration requires a stable system concept. Communication is essential to system simplicity
Third International Symposium on Space Mission Operations and Ground Data Systems, part 1
NASA Technical Reports Server (NTRS)
Rash, James L. (Editor)
1994-01-01
Under the theme of 'Opportunities in Ground Data Systems for High Efficiency Operations of Space Missions,' the SpaceOps '94 symposium included presentations of more than 150 technical papers spanning five topic areas: Mission Management, Operations, Data Management, System Development, and Systems Engineering. The papers focus on improvements in the efficiency, effectiveness, productivity, and quality of data acquisition, ground systems, and mission operations. New technology, techniques, methods, and human systems are discussed. Accomplishments are also reported in the application of information systems to improve data retrieval, reporting, and archiving; the management of human factors; the use of telescience and teleoperations; and the design and implementation of logistics support for mission operations.
Analysis of remote operating systems for space-based servicing operations, volume 1
NASA Technical Reports Server (NTRS)
1985-01-01
A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.
NASA Technical Reports Server (NTRS)
Campbell, R. H.; Essick, R. B.; Grass, J.; Johnston, G.; Kenny, K.; Russo, V.
1986-01-01
The EOS project is investigating the design and construction of a family of real-time distributed embedded operating systems for reliable, distributed aerospace applications. Using the real-time programming techniques developed in co-operation with NASA in earlier research, the project staff is building a kernel for a multiple processor networked system. The first six months of the grant included a study of scheduling in an object-oriented system, the design philosophy of the kernel, and the architectural overview of the operating system. In this report, the operating system and kernel concepts are described. An environment for the experiments has been built and several of the key concepts of the system have been prototyped. The kernel and operating system is intended to support future experimental studies in multiprocessing, load-balancing, routing, software fault-tolerance, distributed data base design, and real-time processing.
Code of Federal Regulations, 2010 CFR
2010-04-01
... laboratory operations associated with the production and process control system? 111.110 Section 111.110 Food... OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control System: Requirements for Quality Control... production and process control system? Quality control operations for laboratory operations associated with...
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... system; highway operations. 325.37 Section 325.37 Transportation Other Regulations Relating to...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations..., the holder must orient himself/herself relative to the highway in a manner consistent with the...
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... system; highway operations. 325.37 Section 325.37 Transportation Other Regulations Relating to...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations..., the holder must orient himself/herself relative to the highway in a manner consistent with the...
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... system; highway operations. 325.37 Section 325.37 Transportation Other Regulations Relating to...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations..., the holder must orient himself/herself relative to the highway in a manner consistent with the...
Specification and Verification of Secure Concurrent and Distributed Software Systems
1992-02-01
primitive search strategies work for operating systems that contain relatively few operations . As the number of operations increases, so does the the...others have granted him access to, etc . The burden of security falls on the operating system , although appropriate hardware support can minimize the...Guttag, J. Horning, and R. Levin. Synchronization primitives for a multiprocessor: a formal specification. Symposium on Operating System Principles
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
40 CFR 49.143 - Construction and operational control measures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...: (i) An operating system designed to recover and inject all the produced natural gas into a natural... closed-vent system to: (i) An operating system designed to recover and inject the natural gas emissions... that pipeline injection of all or part of the natural gas collected in an operating system designed to...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
40 CFR 49.143 - Construction and operational control measures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...: (i) An operating system designed to recover and inject all the produced natural gas into a natural... closed-vent system to: (i) An operating system designed to recover and inject the natural gas emissions... that pipeline injection of all or part of the natural gas collected in an operating system designed to...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
Supporting Operational Data Assimilation Capabilities to the Research Community
NASA Astrophysics Data System (ADS)
Shao, H.; Hu, M.; Stark, D. R.; Zhou, C.; Beck, J.; Ge, G.
2017-12-01
The Developmental Testbed Center (DTC), in partnership with the National Centers for Environmental Prediction (NCEP) and other operational and research institutions, provides operational data assimilation capabilities to the research community and helps transition research advances to operations. The primary data assimilation system supported currently by the DTC is the Gridpoint Statistical Interpolation (GSI) system and the National Oceanic and Atmospheric Administration (NOAA) Ensemble Kalman Filter (EnKF) system. GSI is a variational based system being used for daily operations at NOAA, NCEP, the National Aeronautics and Space Administration, and other operational agencies. Recently, GSI has evolved into a four-dimensional EnVar system. Since 2009, the DTC has been releasing the GSI code to the research community annually and providing user support. In addition to GSI, the DTC, in 2015, began supporting the ensemble based EnKF data assimilation system. EnKF shares the observation operator with GSI and therefore, just as GSI, can assimilate both conventional and non-conventional data (e.g., satellite radiance). Currently, EnKF is being implemented as part of the GSI based hybrid EnVar system for NCEP Global Forecast System operations. This paper will summarize the current code management and support framework for these two systems. Following that is a description of available community services and facilities. Also presented is the pathway for researchers to contribute their development to the daily operations of these data assimilation systems.
Commanding and Controlling Satellite Clusters (IEEE Intelligent Systems, November/December 2000)
2000-01-01
real - time operating system , a message-passing OS well suited for distributed...ground Flight processors ObjectAgent RTOS SCL RTOS RDMS Space command language Real - time operating system Rational database management system TS-21 RDMS...engineer with Princeton Satellite Systems. She is working with others to develop ObjectAgent software to run on the OSE Real Time Operating System .
Systemic Operational Design: Improving Operational Planning for the Netherlands Armed Forces
2006-05-25
This methodology is called Soft Systems Methodology . His methodology is a structured way of thinking in which not only a perceived problematic...Many similarities exist between Systemic Operational Design and Soft Systems Methodology , their epistemology is related. Furthermore, they both have...Systems Thinking: Managing Chaos and Complexity. Boston: Butterworth Heinemann, 1999. Checkland, Peter, and Jim Scholes. Soft Systems Methodology in
Spatial operator algebra framework for multibody system dynamics
NASA Technical Reports Server (NTRS)
Rodriguez, G.; Jain, Abhinandan; Kreutz, K.
1989-01-01
The Spatial Operator Algebra framework for the dynamics of general multibody systems is described. The use of a spatial operator-based methodology permits the formulation of the dynamical equations of motion of multibody systems in a concise and systematic way. The dynamical equations of progressively more complex grid multibody systems are developed in an evolutionary manner beginning with a serial chain system, followed by a tree topology system and finally, systems with arbitrary closed loops. Operator factorizations and identities are used to develop novel recursive algorithms for the forward dynamics of systems with closed loops. Extensions required to deal with flexible elements are also discussed.
Spatial Operator Algebra for multibody system dynamics
NASA Technical Reports Server (NTRS)
Rodriguez, G.; Jain, A.; Kreutz-Delgado, K.
1992-01-01
The Spatial Operator Algebra framework for the dynamics of general multibody systems is described. The use of a spatial operator-based methodology permits the formulation of the dynamical equations of motion of multibody systems in a concise and systematic way. The dynamical equations of progressively more complex grid multibody systems are developed in an evolutionary manner beginning with a serial chain system, followed by a tree topology system and finally, systems with arbitrary closed loops. Operator factorizations and identities are used to develop novel recursive algorithms for the forward dynamics of systems with closed loops. Extensions required to deal with flexible elements are also discussed.
[The use of an opect optic system in neurosurgical practice].
Kalinovskiy, A V; Rzaev, D A; Yoshimitsu, K
2018-01-01
Modern neurosurgical practice is impossible without access to various information sources. The use of MRI and MSCT data during surgery is an integral part of the neurosurgeon's daily practice. Devices capable of managing an image viewer system without direct contact with equipment simplify working in the operating room. To test operation of a non-contact MRI and MSCT image viewer system in the operating room and to evaluate the system effectiveness. An Opect non-contact image management system developed at the Tokyo Women's Medical University was installed in one of the operating rooms of the Novosibirsk Federal Center of Neurosurgery in 2014. In 2015, the Opect system was used by operating surgeons in 73 surgeries performed in the same operating room. The system effectiveness was analyzed based on a survey of surgeons. The non-contact image viewer system occurred to be easy-to-learn for the personnel to operate this system, easy-to-manage it, and easy-to-present visual information during surgery. Application of the Opect system simplifies work with neuroimaging data during surgery. The surgeon can independently view series of relevant MRI and MSCT scans without any assistance.
Description of the control system design for the SSF PMAD DC testbed
NASA Technical Reports Server (NTRS)
Baez, Anastacio N.; Kimnach, Greg L.
1991-01-01
The Power Management and Distribution (PMAD) DC Testbed Control System for Space Station Freedom was developed using a top down approach based on classical control system and conventional terrestrial power utilities design techniques. The design methodology includes the development of a testbed operating concept. This operating concept describes the operation of the testbed under all possible scenarios. A unique set of operating states was identified and a description of each state, along with state transitions, was generated. Each state is represented by a unique set of attributes and constraints, and its description reflects the degree of system security within which the power system is operating. Using the testbed operating states description, a functional design for the control system was developed. This functional design consists of a functional outline, a text description, and a logical flowchart for all the major control system functions. Described here are the control system design techniques, various control system functions, and the status of the design and implementation.
Considerations for a design and operations knowledge support system for Space Station Freedom
NASA Technical Reports Server (NTRS)
Erickson, Jon D.; Crouse, Kenneth H.; Wechsler, Donald B.; Flaherty, Douglas R.
1989-01-01
Engineering and operations of modern engineered systems depend critically upon detailed design and operations knowledge that is accurate and authoritative. A design and operations knowledge support system (DOKSS) is a modern computer-based information system providing knowledge about the creation, evolution, and growth of an engineered system. The purpose of a DOKSS is to provide convenient and effective access to this multifaceted information. The complexity of Space Station Freedom's (SSF's) systems, elements, interfaces, and organizations makes convenient access to design knowledge especially important, when compared to simpler systems. The life cycle length, being 30 or more years, adds a new dimension to space operations, maintenance, and evolution. Provided here is a review and discussion of design knowledge support systems to be delivered and operated as a critical part of the engineered system. A concept of a DOKSS for Space Station Freedom (SSF) is presented. This is followed by a detailed discussion of a DOKSS for the Lyndon B. Johnson Space Center and Work Package-2 portions of SSF.
Appraisal of the Operation Respond Emergency Information System (OREIS)
DOT National Transportation Integrated Search
1998-04-01
The Operation Respond Institute has been instrumental in developing the Operation Respond Emergency Information System (OREIS) for first responders to hazardous material incidents in transportation. The Operation Respond system aims to facilitate rap...
NASA Astrophysics Data System (ADS)
Kostyukov, V. N.; Naumenko, A. P.
2017-08-01
The paper dwells upon urgent issues of evaluating impact of actions conducted by complex technological systems operators on their safe operation considering application of condition monitoring systems for elements and sub-systems of petrochemical production facilities. The main task for the research is to distinguish factors and criteria of monitoring system properties description, which would allow to evaluate impact of errors made by personnel on operation of real-time condition monitoring and diagnostic systems for machinery of petrochemical facilities, and find and objective criteria for monitoring system class, considering a human factor. On the basis of real-time condition monitoring concepts of sudden failure skipping risk, static and dynamic error, monitoring systems, one may solve a task of evaluation of impact that personnel's qualification has on monitoring system operation in terms of error in personnel or operators' actions while receiving information from monitoring systems and operating a technological system. Operator is considered as a part of the technological system. Although, personnel's behavior is usually a combination of the following parameters: input signal - information perceiving, reaction - decision making, response - decision implementing. Based on several researches on behavior of nuclear powers station operators in USA, Italy and other countries, as well as on researches conducted by Russian scientists, required data on operator's reliability were selected for analysis of operator's behavior at technological facilities diagnostics and monitoring systems. The calculations revealed that for the monitoring system selected as an example, the failure skipping risk for the set values of static (less than 0.01) and dynamic (less than 0.001) errors considering all related factors of data on reliability of information perception, decision-making, and reaction fulfilled is 0.037, in case when all the facilities and error probability are under control - not more than 0.027. In case when only pump and compressor units are under control, the failure skipping risk is not more than 0.022, when the probability of error in operator's action is not more than 0.011. The work output shows that on the basis of the researches results an assessment of operators' reliability can be made in terms of almost any kind of production, but considering only technological capabilities, since operators' psychological and general training considerable vary in different production industries. Using latest technologies of engineering psychology and design of data support systems, situation assessment systems, decision-making and responding system, as well as achievement in condition monitoring in various production industries one can evaluate hazardous condition skipping risk probability considering static, dynamic errors and human factor.
Influence of System Operation Method on CO2 Emissions of PV/Solar Heat/Cogeneration System
NASA Astrophysics Data System (ADS)
Oke, Shinichiro; Kemmoku, Yoshishige; Takikawa, Hirofumi; Sakakibara, Tateki
A PV/solar heat/cogeneration system is assumed to be installed in a hotel. The system is operated with various operation methods: CO2 minimum operation, fees minimum operation, seasonal operation, daytime operation and heat demand following operation. Of these five operations, the former two are virtual operations that are operated with the dynamic programming method, and the latter three are actual operations. Computer simulation is implemented using hourly data of solar radiation intensity, atmospheric temperature, electric, cooling, heating and hot water supply demands for one year, and the life-cycle CO2 emission and the total cost are calculated for every operations. The calculation results show that the virtual two and the actual three operations reduce the life-cycle CO2 emission by 21% and 13% compared with the conventional system, respectively. In regard to both the CO2 emission and the cost, there is no significant difference between the virtual two operation methods or among actual three operation methods.
NASA Technical Reports Server (NTRS)
Byrd, Raymond J.
1990-01-01
This study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advance Launch System (ALS) program, the results of the Operationally Efficient Propulsion System Study (OEPSS) were organized into a series of OEPSS Data Books as follows: Volume 1, Generic Ground Operations Data; Volume 2, Ground Operations Problems; Volume 3, Operations Technology; Volume 4, OEPSS Design Concepts; and Volume 5, OEPSS Final Review Briefing, which summarizes the activities and results of the study. This volume presents ground processing data for a generic LOX/LH2 booster and core propulsion system based on current STS experience. The data presented includes: top logic diagram, process flow, activities bar-chart, loaded timelines, manpower requirements in terms of duration, headcount and skill mix per operations and maintenance instruction (OMI), and critical path tasks and durations.
32 CFR Appendix B to Part 323 - Criteria for New and Altered Record Systems
Code of Federal Regulations, 2010 CFR
2010-07-01
... as operating systems and system utilities that provide for easier access are considered alterations... terminals does not extend the capacity of the current operating system and existing security is preserved. f... not operate a system of records until the waiting periods have expired. E. Outside review of new and...
32 CFR Appendix B to Part 323 - Criteria for New and Altered Record Systems
Code of Federal Regulations, 2012 CFR
2012-07-01
... as operating systems and system utilities that provide for easier access are considered alterations... terminals does not extend the capacity of the current operating system and existing security is preserved. f... not operate a system of records until the waiting periods have expired. E. Outside review of new and...
32 CFR Appendix B to Part 323 - Criteria for New and Altered Record Systems
Code of Federal Regulations, 2011 CFR
2011-07-01
... as operating systems and system utilities that provide for easier access are considered alterations... terminals does not extend the capacity of the current operating system and existing security is preserved. f... not operate a system of records until the waiting periods have expired. E. Outside review of new and...
Rogers, David A; Lingard, Lorelei; Boehler, Margaret L; Espin, Sherry; Schindler, Nancy; Klingensmith, Mary; Mellinger, John D
2013-09-01
Prior research has shown that surgeons who effectively manage operating room conflict engage in a problem-solving stage devoted to modifying systems that contribute to team conflict. The purpose of this study was to clarify how systems contributed to operating room team conflict and clarify what surgeons do to modify them. Focus groups of circulating nurses and surgeons were conducted at 5 academic medical centers. Narratives describing the contributions of systems to operating room conflict and behaviors used by surgeons to address those systems were analyzed using the constant comparative approach associated with a constructivist grounded theory approach. Operating room team conflict was affected by 4 systems-related factors: team features, procedural-specific staff training, equipment management systems, and the administrative leadership itself. Effective systems problem solving included advocating for change based on patient safety concerns. The results of this study provide clarity about how systems contribute to operating room conflict and what surgeons can do to effectively modify these systems. This information is foundational material for a conflict management educational program for surgeons. Copyright © 2013 Elsevier Inc. All rights reserved.
An Operating Environment for the Jellybean Machine
1988-05-01
MODEL 48 5.4.4 Restarting a Context The operating system provides one primitive message (RESTART-CONTEXT) and two system calls (XFERID and XFER.ADDR) to...efficient, powerful services is reqired to support this "stem. To provide this supportive operating environment, I developed an operating system kernel that...serves many of the initial needs of our machine. This Jellybean Operating System Software provides an object- based storage model, where typed
Intent inferencing with a model-based operator's associate
NASA Technical Reports Server (NTRS)
Jones, Patricia M.; Mitchell, Christine M.; Rubin, Kenneth S.
1989-01-01
A portion of the Operator Function Model Expert System (OFMspert) research project is described. OFMspert is an architecture for an intelligent operator's associate or assistant that can aid the human operator of a complex, dynamic system. Intelligent aiding requires both understanding and control. The understanding (i.e., intent inferencing) ability of the operator's associate is discussed. Understanding or intent inferencing requires a model of the human operator; the usefulness of an intelligent aid depends directly on the fidelity and completeness of its underlying model. The model chosen for this research is the operator function model (OFM). The OFM represents operator functions, subfunctions, tasks, and actions as a heterarchic-hierarchic network of finite state automata, where the arcs in the network are system triggering events. The OFM provides the structure for intent inferencing in that operator functions and subfunctions correspond to likely operator goals and plans. A blackboard system similar to that of Human Associative Processor (HASP) is proposed as the implementation of intent inferencing function. This system postulates operator intentions based on current system state and attempts to interpret observed operator actions in light of these hypothesized intentions.
Operationally Efficient Propulsion System Study (OEPSS) data book. Executive summary
NASA Technical Reports Server (NTRS)
Wong, George S.
1990-01-01
The study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the Operationally Efficient Propulsion System Study (OEPSS) were organized into a series of OEPSS Data Books as follows: Volume 1, Generic Ground Operations Data; Volume 2, Ground Operations Problems; Volume 3, Operations Technology; Volume 4, OEPSS Design Concepts; and Volume 5, OEPSS Final Review Briefing, which summarizes the activities and results of the study. Summarized here are the salient results of the first year. A synopsis of each volume listed above is presented.
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2012 CFR
2012-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2012-10-01 2012-10-01 false Maximum and minimum allowable operating pressure...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2011 CFR
2011-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2011-10-01 2011-10-01 false Maximum and minimum allowable operating pressure...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2013 CFR
2013-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2013-10-01 2013-10-01 false Maximum and minimum allowable operating pressure...
Code of Federal Regulations, 2014 CFR
2014-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2014-10-01 2014-10-01 false Maximum and minimum allowable operating pressure...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.4966 Section 63... system and add-on control device operating limits during the performance test? During the performance... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system...
Code of Federal Regulations, 2010 CFR
2010-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2010-10-01 2010-10-01 false Maximum and minimum allowable operating pressure...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.4966 Section 63... system and add-on control device operating limits during the performance test? During the performance... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... New York Independent System Operator, Inc.; and In the Matter of the Petition for an Exemptive Order... Independent System Operator (``CAISO'') and New York Independent System Operator (``NYISO'')), whose central... Commodity Exchange Act by ISO New England Inc.; In the Matter of the Petition for an Exemptive Order Under...
Oak Ridge Reservation Public Warning Siren System Annual Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. F. Gee
2000-10-01
The full operational test of the Oak Ridge Reservation (ORR) Public Warning Siren System (PWSS) was successfully conducted on September 27, 2000. The annual test is a full-scale sounding of the individual siren systems around each of the three Department of Energy (DOE) sites in Oak Ridge, Tennessee. The purpose of the annual test is to demonstrate and validate the siren systems' ability to alert personnel outdoors in the Immediate Notification Zones (INZ) (approximately two miles) around each site. The success of this test is based on two critical functions of the siren system. The first function is system operability.more » The system is considered operable if 90% of the sirens are operational. System diagnostics and direct field observations were used to validate the operability of the siren systems. Based on the diagnostic results and field observations, greater than 90% of the sirens were considered operational. The second function is system audibility. The system is considered audible if the siren could be heard in the immediate notification zones around each of the three sites. Direct field observations, along with sound level measurements, were used to validate the audibility of the siren system. Based on the direct field observations and sound level measurements, the siren system was considered audible. The combination of field observations, system diagnostic status reports, and sound level measurements provided a high level of confidence that the system met and would meet operational requirements upon demand. As part of the overall system test, the Tennessee Emergency Management Agency (TEMA) activated the Emergency Alerting System (EAS), which utilized area radio stations to make announcements regarding the test and to remind residents of what to do in the event of an actual emergency.« less
Operating System Abstraction Layer (OSAL)
NASA Technical Reports Server (NTRS)
Yanchik, Nicholas J.
2007-01-01
This viewgraph presentation reviews the concept of the Operating System Abstraction Layer (OSAL) and its benefits. The OSAL is A small layer of software that allows programs to run on many different operating systems and hardware platforms It runs independent of the underlying OS & hardware and it is self-contained. The benefits of OSAL are that it removes dependencies from any one operating system, promotes portable, reusable flight software. It allows for Core Flight software (FSW) to be built for multiple processors and operating systems. The presentation discusses the functionality, the various OSAL releases, and describes the specifications.
Liquid and Gaseous Waste Operations Department annual operating report CY 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maddox, J.J.; Scott, C.B.
1997-03-01
This annual report summarizes operating activities dealing with the process waste system, the liquid low-level waste system, and the gaseous waste system. It also describes upgrade activities dealing with the process and liquid low-level waste systems, the cathodic protection system, a stack ventilation system, and configuration control. Maintenance activities are described dealing with nonradiological wastewater treatment plant, process waste treatment plant and collection system, liquid low-level waste system, and gaseous waste system. Miscellaneous activities include training, audits/reviews/tours, and environmental restoration support.
TeleOperator/telePresence System (TOPS) Concept Verification Model (CVM) development
NASA Technical Reports Server (NTRS)
Shimamoto, Mike S.
1993-01-01
The development of an anthropomorphic, undersea manipulator system, the TeleOperator/telePresence System (TOPS) Concept Verification Model (CVM) is described. The TOPS system's design philosophy, which results from NRaD's experience in undersea vehicles and manipulator systems development and operations, is presented. The TOPS design approach, task teams, manipulator, and vision system development and results, conclusions, and recommendations are presented.
Feasibility Analysis and Prototyping of a Fast Autonomous Recon system
2017-06-01
Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22
NASA Astrophysics Data System (ADS)
Ibrahim, Wael Refaat Anis
The present research involves the development of several fuzzy expert systems for power quality analysis and diagnosis. Intelligent systems for the prediction of abnormal system operation were also developed. The performance of all intelligent modules developed was either enhanced or completely produced through adaptive fuzzy learning techniques. Neuro-fuzzy learning is the main adaptive technique utilized. The work presents a novel approach to the interpretation of power quality from the perspective of the continuous operation of a single system. The research includes an extensive literature review pertaining to the applications of intelligent systems to power quality analysis. Basic definitions and signature events related to power quality are introduced. In addition, detailed discussions of various artificial intelligence paradigms as well as wavelet theory are included. A fuzzy-based intelligent system capable of identifying normal from abnormal operation for a given system was developed. Adaptive neuro-fuzzy learning was applied to enhance its performance. A group of fuzzy expert systems that could perform full operational diagnosis were also developed successfully. The developed systems were applied to the operational diagnosis of 3-phase induction motors and rectifier bridges. A novel approach for learning power quality waveforms and trends was developed. The technique, which is adaptive neuro fuzzy-based, learned, compressed, and stored the waveform data. The new technique was successfully tested using a wide variety of power quality signature waveforms, and using real site data. The trend-learning technique was incorporated into a fuzzy expert system that was designed to predict abnormal operation of a monitored system. The intelligent system learns and stores, in compressed format, trends leading to abnormal operation. The system then compares incoming data to the retained trends continuously. If the incoming data matches any of the learned trends, an alarm is instigated predicting the advent of system abnormal operation. The incoming data could be compared to previous trends as well as matched to trends developed through computer simulations and stored using fuzzy learning.
Lemmetty, Kaisa; Häyrinen, Eija
2005-01-01
In this paper we evaluate the implementation of the operation management system in the Central Finland Health Care District. The implementation of the operation management system changed the practice of operation management for the surgical clinic and concerned 500 personnel in total. A survey was carried out to investigate the end users' views on the system's usefulness, usability and the training and user support provided. The users' possibilities to accomplish their tasks and the kind of obstacles they face in operation management were explored. The assessment revealed that more end support is needed after the system implementation, even though a generally positive attitude towards the system was manifested among the staff.
InkTag: Secure Applications on an Untrusted Operating System
Hofmann, Owen S.; Kim, Sangman; Dunn, Alan M.; Lee, Michael Z.; Witchel, Emmett
2014-01-01
InkTag is a virtualization-based architecture that gives strong safety guarantees to high-assurance processes even in the presence of a malicious operating system. InkTag advances the state of the art in untrusted operating systems in both the design of its hypervisor and in the ability to run useful applications without trusting the operating system. We introduce paraverification, a technique that simplifies the InkTag hypervisor by forcing the untrusted operating system to participate in its own verification. Attribute-based access control allows trusted applications to create decentralized access control policies. InkTag is also the first system of its kind to ensure consistency between secure data and metadata, ensuring recoverability in the face of system crashes. PMID:24429939
InkTag: Secure Applications on an Untrusted Operating System.
Hofmann, Owen S; Kim, Sangman; Dunn, Alan M; Lee, Michael Z; Witchel, Emmett
2013-01-01
InkTag is a virtualization-based architecture that gives strong safety guarantees to high-assurance processes even in the presence of a malicious operating system. InkTag advances the state of the art in untrusted operating systems in both the design of its hypervisor and in the ability to run useful applications without trusting the operating system. We introduce paraverification , a technique that simplifies the InkTag hypervisor by forcing the untrusted operating system to participate in its own verification. Attribute-based access control allows trusted applications to create decentralized access control policies. InkTag is also the first system of its kind to ensure consistency between secure data and metadata, ensuring recoverability in the face of system crashes.
Perfect commuting-operator strategies for linear system games
NASA Astrophysics Data System (ADS)
Cleve, Richard; Liu, Li; Slofstra, William
2017-01-01
Linear system games are a generalization of Mermin's magic square game introduced by Cleve and Mittal. They show that perfect strategies for linear system games in the tensor-product model of entanglement correspond to finite-dimensional operator solutions of a certain set of non-commutative equations. We investigate linear system games in the commuting-operator model of entanglement, where Alice and Bob's measurement operators act on a joint Hilbert space, and Alice's operators must commute with Bob's operators. We show that perfect strategies in this model correspond to possibly infinite-dimensional operator solutions of the non-commutative equations. The proof is based around a finitely presented group associated with the linear system which arises from the non-commutative equations.
Timeline-Based Mission Operations Architecture: An Overview
NASA Technical Reports Server (NTRS)
Chung, Seung H.; Bindschadler, Duane L.
2012-01-01
Some of the challenges in developing a mission operations system and operating a mission can be traced back to the challenge of integrating a mission operations system from its many components and to the challenge of maintaining consistent and accountable information throughout the operations processes. An important contributing factor to both of these challenges is the file-centric nature of today's systems. In this paper, we provide an overview of these challenges and argue the need to move toward an information-centric mission operations system. We propose an information representation called Timeline as an approach to enable such a move, and we provide an overview of a Timeline-based Mission Operations System architecture.
Head-mounted display systems and the special operations soldier
NASA Astrophysics Data System (ADS)
Loyd, Rodney B.
1998-08-01
In 1997, the Boeing Company, working with DARPA under the Smart Modules program and the US Army Soldier Systems Command, embarked on an advanced research and development program to develop a wearable computer system tailored for use with soldiers of the US Special Operations Command. The 'special operations combat management system' is a rugged advanced wearable tactical computer, designed to provide the special operations soldier with enhanced situation awareness and battlefield information capabilities. Many issues must be considered during the design of wearable computers for a combat soldier, including the system weight, placement on the body with respect to other equipment, user interfaces and display system characteristics. During the initial feasibility study for the system, the operational environment was examined and potential users were interviewed to establish the proper display solution for the system. Many display system requirements resulted, such as head or helmet mounting, Night Vision Goggle compatibility, minimal visible light emissions, environmental performance and even the need for handheld or other 'off the head' type display systems. This paper will address these issues and other end user requirements for display systems for applications in the harsh and demanding environment of the Special Operations soldier.
Solar energy system performance evaluation - Seasonal Report for Seeco Lincoln, Lincoln, Nebraska
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-06-01
The SEECO Lincoln Solar Energy System was designed to provide 60 percent of the space heating for the 50 seat Hyde Memorial Observatory in Lincoln, Nebraska. The system consists of nine SEECO Mod 1 flat plate air collectors (481 square feet), a 347 cubic foot rock storage bin, blowers, controls and air ducting. An auxiliary natural gas furnace provides additional energy when the solar energy is not adequate to meet the space heating demand. The system has five modes of operation. System description, typical system operation, system operating sequence, performance assessment, system performance, subsystem performance (collector array, storage, space heating),more » operating energy, energy savings and maintenance are discussed.« less
Code of Federal Regulations, 2013 CFR
2013-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2010 CFR
2010-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2012 CFR
2012-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2014 CFR
2014-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2011 CFR
2011-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
75 FR 16676 - Airworthiness Standards; Electrical and Electronic System Lightning Protection
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... systems that allow them to operate into instrument meteorological conditions (IMC), where lightning... 27 standards that operate in VFR-only operations with electrical or electronic systems installed for... Airworthiness Standards; Electrical and Electronic System Lightning Protection AGENCY: Federal Aviation...
NASA Technical Reports Server (NTRS)
Dasgupta, Partha; Leblanc, Richard J., Jr.; Appelbe, William F.
1988-01-01
Clouds is an operating system in a novel class of distributed operating systems providing the integration, reliability, and structure that makes a distributed system usable. Clouds is designed to run on a set of general purpose computers that are connected via a medium-of-high speed local area network. The system structuring paradigm chosen for the Clouds operating system, after substantial research, is an object/thread model. All instances of services, programs and data in Clouds are encapsulated in objects. The concept of persistent objects does away with the need for file systems, and replaces it with a more powerful concept, namely the object system. The facilities in Clouds include integration of resources through location transparency; support for various types of atomic operations, including conventional transactions; advanced support for achieving fault tolerance; and provisions for dynamic reconfiguration.
DOT National Transportation Integrated Search
2009-10-01
Transit Operations Decision Support Systems (TODSS) are systems designed to support dispatchers and others in real-time operations : management in response to incidents, special events, and other changing conditions in order to improve operating spee...
Mission operations concepts for Earth Observing System (EOS)
NASA Technical Reports Server (NTRS)
Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.
1991-01-01
Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.
A Management Information System for Allocating, Monitoring and Reviewing Work Assignments.
1986-06-01
This thesis investigated the feasibility of developing a small scale management information system on a micro-computer. The working system was...ORSA journal. The management information system was designed using Ashton-Tate’s dBaseIII software. As designed, the system will operate on any...computer operating under microsoft’s Disk Operating System (MS-DOS). The user must provide his own dBaseIII software. A similar management information system could
The Automation-by-Expertise-by-Training Interaction.
Strauch, Barry
2017-03-01
I introduce the automation-by-expertise-by-training interaction in automated systems and discuss its influence on operator performance. Transportation accidents that, across a 30-year interval demonstrated identical automation-related operator errors, suggest a need to reexamine traditional views of automation. I review accident investigation reports, regulator studies, and literature on human computer interaction, expertise, and training and discuss how failing to attend to the interaction of automation, expertise level, and training has enabled operators to commit identical automation-related errors. Automated systems continue to provide capabilities exceeding operators' need for effective system operation and provide interfaces that can hinder, rather than enhance, operator automation-related situation awareness. Because of limitations in time and resources, training programs do not provide operators the expertise needed to effectively operate these automated systems, requiring them to obtain the expertise ad hoc during system operations. As a result, many do not acquire necessary automation-related system expertise. Integrating automation with expected operator expertise levels, and within training programs that provide operators the necessary automation expertise, can reduce opportunities for automation-related operator errors. Research to address the automation-by-expertise-by-training interaction is needed. However, such research must meet challenges inherent to examining realistic sociotechnical system automation features with representative samples of operators, perhaps by using observational and ethnographic research. Research in this domain should improve the integration of design and training and, it is hoped, enhance operator performance.
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 5 2011-10-01 2011-10-01 false Location and operation of sound level measurement...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations. (a) The microphone of a sound level measurement system that conforms to the rules in § 325.23 of this...
OPERATIONS RESEARCH IN THE DESIGN OF MANAGEMENT INFORMATION SYSTEMS
management information systems is concerned with the identification and detailed specification of the information and data processing...of advanced data processing techniques in management information systems today, the close coordination of operations research and data systems activities has become a practical necessity for the modern business firm.... information systems in which mathematical models are employed as the basis for analysis and systems design. Operations research provides a
Evolvable synthetic neural system
NASA Technical Reports Server (NTRS)
Curtis, Steven A. (Inventor)
2009-01-01
An evolvable synthetic neural system includes an evolvable neural interface operably coupled to at least one neural basis function. Each neural basis function includes an evolvable neural interface operably coupled to a heuristic neural system to perform high-level functions and an autonomic neural system to perform low-level functions. In some embodiments, the evolvable synthetic neural system is operably coupled to one or more evolvable synthetic neural systems in a hierarchy.
ERIC Educational Resources Information Center
Colorado State Univ., Ft. Collins. Solar Energy Applications Lab.
Presented are guidelines for instructors of two courses in the design, installation, and operation of solar heating and cooling systems. These courses are: (1) Design of Systems, and (2) Sizing, Installation, and Operation of Systems. Limited in scope to active solar systems for residential buildings, these courses place primary emphasis upon…
Operator’s Manual. Prototype Heavy Rescue/Fire Fighting Vehicle
1980-09-01
system for emergency operation if pressure is lost in either parking or service brake systems . The system is operational automatically and is...controlled by the foot treadle ’sive. It will provide for TWO full brake applications and ONE release. ELECTRICAL SYSTEM A dual battery system is utilized for...cleaner. * Lubricate chassis. . Repack wheel bearings. . Inspect brake system and adjust brakes . . Replace fuel filter. . Check high and low idle.
NASA Astrophysics Data System (ADS)
Herbuś, K.; Ociepka, P.
2017-08-01
In the work is analysed a sequential control system of a machine for separating and grouping work pieces for processing. Whereas, the area of the considered problem is related with verification of operation of an actuator system of an electro-pneumatic control system equipped with a PLC controller. Wherein to verification is subjected the way of operation of actuators in view of logic relationships assumed in the control system. The actuators of the considered control system were three drives of linear motion (pneumatic cylinders). And the logical structure of the system of operation of the control system is based on the signals flow graph. The tested logical structure of operation of the electro-pneumatic control system was implemented in the Automation Studio software of B&R company. This software is used to create programs for the PLC controllers. Next, in the FluidSIM software was created the model of the actuator system of the control system of a machine. To verify the created program for the PLC controller, simulating the operation of the created model, it was utilized the approach of integration these two programs using the tool for data exchange in the form of the OPC server.
Code of Federal Regulations, 2013 CFR
2013-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2010 CFR
2010-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2013 CFR
2013-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2010 CFR
2010-07-01
... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure.../outlet Concentration Option § 63.3556 How do I establish the emission capture system and add-on control...
Code of Federal Regulations, 2014 CFR
2014-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2012 CFR
2012-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2011 CFR
2011-07-01
... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure.../outlet Concentration Option § 63.3556 How do I establish the emission capture system and add-on control...
Code of Federal Regulations, 2013 CFR
2013-07-01
... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... Control Efficiency/outlet Concentration Option § 63.3556 How do I establish the emission capture system...
Code of Federal Regulations, 2012 CFR
2012-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Advanced Ground Systems Maintenance Prognostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henline, P.A.
1995-12-31
The increased use of UNIX based computer systems for machine control, data handling and analysis has greatly enhanced the operating scenarios and operating efficiency of the DIII-D tokamak. This paper will describe some of these UNIX systems and their specific uses. These include the plasma control system, the electron cyclotron heating control system, the analysis of electron temperature and density measurements and the general data acquisition system (which is collecting over 130 Mbytes of data). The speed and total capability of these systems has dramatically affected the ability to operate DIII-D. The improved operating scenarios include better plasma shape controlmore » due to the more thorough MHD calculations done between shots and the new ability to see the time dependence of profile data as it relates across different spatial locations in the tokamak. Other analysis which engenders improved operating abilities will be described.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henline, P.A.
1995-10-01
The increased use of UNIX based computer systems for machine control, data handling and analysis has greatly enhanced the operating scenarios and operating efficiency of the DRI-D tokamak. This paper will describe some of these UNIX systems and their specific uses. These include the plasma control system, the electron cyclotron heating control system, the analysis of electron temperature and density measurements and the general data acquisition system (which is collecting over 130 Mbytes of data). The speed and total capability of these systems has dramatically affected the ability to operate DIII-D. The improved operating scenarios include better plasma shape controlmore » due to the more thorough MHD calculations done between shots and the new ability to see the time dependence of profile data as it relates across different spatial locations in the tokamak. Other analysis which engenders improved operating abilities will be described.« less
NASDA's Advanced On-Line System (ADOLIS)
NASA Technical Reports Server (NTRS)
Yamamoto, Yoshikatsu; Hara, Hideo; Yamada, Shigeo; Hirata, Nobuyuki; Komatsu, Shigenori; Nishihata, Seiji; Oniyama, Akio
1993-01-01
Spacecraft operations including ground system operations are generally realized by various large or small scale group work which is done by operators, engineers, managers, users and so on, and their positions are geographically distributed in many cases. In face-to-face work environments, it is easy for them to understand each other. However, in distributed work environments which need communication media, if only using audio, they become estranged from each other and lose interest in and continuity of work. It is an obstacle to smooth operation of spacecraft. NASDA has developed an experimental model of a new real-time operation control system called 'ADOLIS' (ADvanced On-Line System) adopted to such a distributed environment using a multi-media system dealing with character, figure, image, handwriting, video and audio information which is accommodated to operation systems of a wide range including spacecraft and ground systems. This paper describes the results of the development of the experimental model.
Implementation of an Intelligent Control System
1992-05-01
there- fore implemented in a portable equipment rack. The controls computer consists of a microcomputer running a real time operating system , interface...circuit boards are mounted in an industry standard Multibus I chassis. The microcomputer runs the iRMX real time operating system . This operating system
A Proposed Operational Concept for the Defense Communications Operations Support System.
1986-01-01
Artificial Intelligence AMA Automatic Message Accounting AMIE AUTODIN Management Index System AMPE Automated Message Processing Exchange ANCS AUTOVON Network...Support IMPRESS Inpact/Restoral System INFORM Information Retrieval System 1OC Initial Operational Capability IRU Intellegent Remote Unit I-S/A AMPE
RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System
NASA Astrophysics Data System (ADS)
Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.
2008-08-01
RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.
Using task analysis to understand the Data System Operations Team
NASA Technical Reports Server (NTRS)
Holder, Barbara E.
1994-01-01
The Data Systems Operations Team (DSOT) currently monitors the Multimission Ground Data System (MGDS) at JPL. The MGDS currently supports five spacecraft and within the next five years, it will support ten spacecraft simultaneously. The ground processing element of the MGDS consists of a distributed UNIX-based system of over 40 nodes and 100 processes. The MGDS system provides operators with little or no information about the system's end-to-end processing status or end-to-end configuration. The lack of system visibility has become a critical issue in the daily operation of the MGDS. A task analysis was conducted to determine what kinds of tools were needed to provide DSOT with useful status information and to prioritize the tool development. The analysis provided the formality and structure needed to get the right information exchange between development and operations. How even a small task analysis can improve developer-operator communications is described, and the challenges associated with conducting a task analysis in a real-time mission operations environment are examined.
Designing Flight-Deck Procedures
NASA Technical Reports Server (NTRS)
Degani, Asaf; Wiener, L.; Shafto, Mike (Technical Monitor)
1995-01-01
A complex human-machine system consists of more than merely one or more human operators and a collection of hardware components. In order to operate a complex system successfully, the human-machine system must be supported by an organizational infrastructure of operating concepts, rules, guidelines, and documents. The coherency of such operating concepts, in terms of consistency and logic, is vitally important for the efficiency and safety of any complex system. In high-risk endeavors such as aircraft operations, space flight, nuclear power production, manufacturing process control, and military operations, it is essential that such support be flawless, as the price of operational error can be high. When operating rules are not adhered to, or the rules are inadequate for the task at hand, not only will the system's goals be thwarted, but there may also be tragic human and material consequences. To ensure safe and predictable operations, support to the operators, in this case flight crews, often comes in the form of standard operating procedures. These provide the crew with step-by-step guidance for carrying out their operations. Standard procedures do indeed promote uniformity, but they do so at the risk of reducing the role of human operators to a lower level. Management, however, must recognize the danger of over-procedurization, which fails to exploit one of the most valuable assets in the system, the intelligent operator who is "on the scene." The alert system designer and operations manager recognize that there cannot be a procedure for everything, and the time will come in which the operators of a complex system will face a situation for which there is no written procedure. Procedures, whether executed by humans or machines, have their place, but so does human cognition.
Intelligent Operation and Maintenance of Micro-grid Technology and System Development
NASA Astrophysics Data System (ADS)
Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian
2018-01-01
In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.
Optimization of power systems with voltage security constraints
NASA Astrophysics Data System (ADS)
Rosehart, William Daniel
As open access market principles are applied to power systems, significant changes in their operation and control are occurring. In the new marketplace, power systems are operating under higher loading conditions as market influences demand greater attention to operating cost versus stability margins. Since stability continues to be a basic requirement in the operation of any power system, new tools are being considered to analyze the effect of stability on the operating cost of the system, so that system stability can be incorporated into the costs of operating the system. In this thesis, new optimal power flow (OPF) formulations are proposed based on multi-objective methodologies to optimize active and reactive power dispatch while maximizing voltage security in power systems. The effects of minimizing operating costs, minimizing reactive power generation and/or maximizing voltage stability margins are analyzed. Results obtained using the proposed Voltage Stability Constrained OPF formulations are compared and analyzed to suggest possible ways of costing voltage security in power systems. When considering voltage stability margins the importance of system modeling becomes critical, since it has been demonstrated, based on bifurcation analysis, that modeling can have a significant effect of the behavior of power systems, especially at high loading levels. Therefore, this thesis also examines the effects of detailed generator models and several exponential load models. Furthermore, because of its influence on voltage stability, a Static Var Compensator model is also incorporated into the optimization problems.
Marshall Space Flight Center Ground Systems Development and Integration
NASA Technical Reports Server (NTRS)
Wade, Gina
2016-01-01
Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.
Analysis of Interactive Graphics Display Equipment for an Automated Photo Interpretation System.
1982-06-01
System provides the hardware and software for a range of graphics processor tasks. The IMAGE System employs the RSX- II M real - time operating . system in...One hard copy unit serves up to four work stations. The executive program of the IMAGE system is the DEC RSX- 11 M real - time operating system . In...picture controller. The PDP 11/34 executes programs concurrently under the RSX- I IM real - time operating system . Each graphics program consists of a
Terminal-area STOL operating systems experiments program
NASA Technical Reports Server (NTRS)
Smith, D. W.; Watson, D.; Christensen, J. V.
1972-01-01
A system study to determine the application of short takeoff aircraft for a high speed, short haul air transportation service was conducted. The study focused on developing information which will aid in choosing system concepts, design criteria, operating procedures, landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. A terminal area STOL operating system experiments program was developed. The objectives, program approach, program schedule, typical experiments, research facilities to be used, and program status are discussed.
Operation quality assessment model for video conference system
NASA Astrophysics Data System (ADS)
Du, Bangshi; Qi, Feng; Shao, Sujie; Wang, Ying; Li, Weijian
2018-01-01
Video conference system has become an important support platform for smart grid operation and management, its operation quality is gradually concerning grid enterprise. First, the evaluation indicator system covering network, business and operation maintenance aspects was established on basis of video conference system's operation statistics. Then, the operation quality assessment model combining genetic algorithm with regularized BP neural network was proposed, which outputs operation quality level of the system within a time period and provides company manager with some optimization advice. The simulation results show that the proposed evaluation model offers the advantages of fast convergence and high prediction accuracy in contrast with regularized BP neural network, and its generalization ability is superior to LM-BP neural network and Bayesian BP neural network.
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
EarthSat spring wheat yield system test 1975
NASA Technical Reports Server (NTRS)
1976-01-01
The results of an operational test of the EarthSat System during the period 1 June - 30 August 1975 over the spring wheat regions of North Dakota, South Dakota, and Minnesota are presented. The errors associated with each sub-element of the system during the operational test and the sensitivity of the complete system and each major functional sub-element of the system to the observed errors were evaluated. Evaluations and recommendations for future operational users of the system include: (1) changes in various system sub-elements, (2) changes in the yield model to affect improved accuracy, (3) changes in the number of geobased cells needed to develop an accurate aggregated yield estimate, (4) changes associated with the implementation of future operational satellites and data processing systems, and (5) detailed system documentation.
NASA Technical Reports Server (NTRS)
Happell, Nadine; Miksell, Steve; Carlisle, Candace
1989-01-01
A major barrier in taking expert systems from prototype to operational status involves instilling end user confidence in the operational system. The software of different life cycle models is examined and the advantages and disadvantages of each when applied to expert system development are explored. The Fault Isolation Expert System for Tracking and data relay satellite system Applications (FIESTA) is presented as a case study of development of an expert system. The end user confidence necessary for operational use of this system is accentuated by the fact that it will handle real-time data in a secure environment, allowing little tolerance for errors. How FIESTA is dealing with transition problems as it moves from an off-line standalone prototype to an on-line real-time system is discussed.
NASA Technical Reports Server (NTRS)
Happell, Nadine; Miksell, Steve; Carlisle, Candace
1989-01-01
A major barrier in taking expert systems from prototype to operational status involves instilling end user confidence in the operational system. The software of different life cycle models is examined and the advantages and disadvantages of each when applied to expert system development are explored. The Fault Isolation Expert System for Tracking and data relay satellite system Applications (FIESTA) is presented as a case study of development of an expert system. The end user confidence necessary for operational use of this system is accentuated by the fact that it will handle real-time data in a secure environment, allowing little tolerance for errors. How FIESTA is dealing with transition problems as it moves from an off-line standalone prototype to an on-line real-time system is discussed.
Software fault tolerance in computer operating systems
NASA Technical Reports Server (NTRS)
Iyer, Ravishankar K.; Lee, Inhwan
1994-01-01
This chapter provides data and analysis of the dependability and fault tolerance for three operating systems: the Tandem/GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Based on measurements from these systems, basic software error characteristics are investigated. Fault tolerance in operating systems resulting from the use of process pairs and recovery routines is evaluated. Two levels of models are developed to analyze error and recovery processes inside an operating system and interactions among multiple instances of an operating system running in a distributed environment. The measurements show that the use of process pairs in Tandem systems, which was originally intended for tolerating hardware faults, allows the system to tolerate about 70% of defects in system software that result in processor failures. The loose coupling between processors which results in the backup execution (the processor state and the sequence of events occurring) being different from the original execution is a major reason for the measured software fault tolerance. The IBM/MVS system fault tolerance almost doubles when recovery routines are provided, in comparison to the case in which no recovery routines are available. However, even when recovery routines are provided, there is almost a 50% chance of system failure when critical system jobs are involved.
Operational Plan for Underground Storage Tank 322 R2U2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griffin, D.
2017-06-07
This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.
A Reserve-based Method for Mitigating the Impact of Renewable Energy
NASA Astrophysics Data System (ADS)
Krad, Ibrahim
The fundamental operating paradigm of today's power systems is undergoing a significant shift. This is partially motivated by the increased desire for incorporating variable renewable energy resources into generation portfolios. While these generating technologies offer clean energy at zero marginal cost, i.e. no fuel costs, they also offer unique operating challenges for system operators. Perhaps the biggest operating challenge these resources introduce is accommodating their intermittent fuel source availability. For this reason, these generators increase the system-wide variability and uncertainty. As a result, system operators are revisiting traditional operating strategies to more efficiently incorporate these generation resources to maximize the benefit they provide while minimizing the challenges they introduce. One way system operators have accounted for system variability and uncertainty is through the use of operating reserves. Operating reserves can be simplified as excess capacity kept online during real time operations to help accommodate unforeseen fluctuations in demand. With new generation resources, a new class of operating reserves has emerged that is generally known as flexibility, or ramping, reserves. This new reserve class is meant to better position systems to mitigate severe ramping in the net load profile. The best way to define this new requirement is still under investigation. Typical requirement definitions focus on the additional uncertainty introduced by variable generation and there is room for improvement regarding explicit consideration for the variability they introduce. An exogenous reserve modification method is introduced in this report that can improve system reliability with minimal impacts on total system wide production costs. Another potential solution to this problem is to formulate the problem as a stochastic programming problem. The unit commitment and economic dispatch problems are typically formulated as deterministic problems due to fast solution times and the solutions being sufficient for operations. Improvements in technical computing hardware have reignited interest in stochastic modeling. The variability of wind and solar naturally lends itself to stochastic modeling. The use of explicit reserve requirements in stochastic models is an area of interest for power system researchers. This report introduces a new reserve modification implementation based on previous results to be used in a stochastic modeling framework. With technological improvements in distributed generation technologies, microgrids are currently being researched and implemented. Microgrids are small power systems that have the ability to serve their demand with their own generation resources and may have a connection to a larger power system. As battery technologies improve, they are becoming a more viable option in these distributed power systems and research is necessary to determine the most efficient way to utilize them. This report will investigate several unique operating strategies for batteries in small power systems and analyze their benefits. These new operating strategies will help reduce operating costs and improve system reliability.
A Cognitive System Model for Human/Automation Dynamics in Airspace Management
NASA Technical Reports Server (NTRS)
Corker, Kevin M.; Pisanich, Gregory; Lebacqz, J. Victor (Technical Monitor)
1997-01-01
NASA has initiated a significant thrust of research and development focused on providing the flight crew and air traffic managers automation aids to increase capacity in en route and terminal area operations through the use of flexible, more fuel-efficient routing, while improving the level of safety in commercial carrier operations. In that system development, definition of cognitive requirements for integrated multi-operator dynamic aiding systems is fundamental. In order to support that cognitive function definition, we have extended the Man Machine Integrated Design and Analysis System (MIDAS) to include representation of multiple cognitive agents (both human operators and intelligent aiding systems) operating aircraft, airline operations centers and air traffic control centers in the evolving airspace. The demands of this application require representation of many intelligent agents sharing world-models, and coordinating action/intention with cooperative scheduling of goals and actions in a potentially unpredictable world of operations. The MIDAS operator models have undergone significant development in order to understand the requirements for operator aiding and the impact of that aiding in the complex nondeterminate system of national airspace operations. The operator model's structure has been modified to include attention functions, action priority, and situation assessment. The cognitive function model has been expanded to include working memory operations including retrieval from long-term store, interference, visual-motor and verbal articulatory loop functions, and time-based losses. The operator's activity structures have been developed to include prioritization and interruption of multiple parallel activities among multiple operators, to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. The model's internal representation has been be modified so that multiple, autonomous sets of equipment will function in a scenario as the single equipment sets do now. In order to support the analysis requirements with multiple items of equipment, it is necessary for equipment to access the state of other equipment objects at initialization time (a radar object may need to access the position and speed of aircraft in its area, for example), and as a function of perception and sensor system interaction. The model has been improved to include multiple world-states as a function of equipment am operator interaction. The model has been used -1o predict the impact of warning and alert zones in aircraft operation, and, more critic-ally, the interaction of flight-deck based warning mechanisms and air traffic controller action in response to ground-based conflict prediction and alerting systems. In this operation, two operating systems provide alerting to two autonomous, but linked sets of operators, whose view of the system and whose dynamics in response are radically different. System stability and operator action was predicted using the MIDAS model.
Identifying Potential Weapon Systems That Can Be Divested
2016-04-08
List of Figures Figure 1.1 – TACOM LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA)……………………………………………………………………….6...LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA) Requirements Tracking System (TORTS) process used to develop...Force operational concepts (Peltz, 2003). The Army’s ability to keep systems operational from a maintenance standpoint is driven by two factors
1994-04-18
because they represent a microkernel and monolithic kernel approach to MLS operating system issues. TMACH is I based on MACH, a distributed operating...the operating system is [L.sed on a microkernel design or a monolithic kernel design. This distinction requires some caution since monolithic operating...are provided by 3 user-level processes, in contrast to standard UNIX, which has a large monolithic kernel that pro- I - 22 - Distributed O)perating
Development of wide area environment accelerator operation and diagnostics method
NASA Astrophysics Data System (ADS)
Uchiyama, Akito; Furukawa, Kazuro
2015-08-01
Remote operation and diagnostic systems for particle accelerators have been developed for beam operation and maintenance in various situations. Even though fully remote experiments are not necessary, the remote diagnosis and maintenance of the accelerator is required. Considering remote-operation operator interfaces (OPIs), the use of standard protocols such as the hypertext transfer protocol (HTTP) is advantageous, because system-dependent protocols are unnecessary between the remote client and the on-site server. Here, we have developed a client system based on WebSocket, which is a new protocol provided by the Internet Engineering Task Force for Web-based systems, as a next-generation Web-based OPI using the Experimental Physics and Industrial Control System Channel Access protocol. As a result of this implementation, WebSocket-based client systems have become available for remote operation. Also, as regards practical application, the remote operation of an accelerator via a wide area network (WAN) faces a number of challenges, e.g., the accelerator has both experimental device and radiation generator characteristics. Any error in remote control system operation could result in an immediate breakdown. Therefore, we propose the implementation of an operator intervention system for remote accelerator diagnostics and support that can obviate any differences between the local control room and remote locations. Here, remote-operation Web-based OPIs, which resolve security issues, are developed.
Advanced Extremely High Frequency Satellite (AEHF)
2013-12-01
terminals Milstar Backward Compatible Operate with the Milstar system, at all LDR and MDR terminal supported data rates, throughout the Milstar...transition to the AEHF system Operate with the Milstar system, at all LDR and MDR terminal supported data rates, throughout the Milstar...transition to the AEHF system Operate with the Milstar system, at all LDR and MDR terminal supported data rates, throughout the Milstar
14 CFR 121.313 - Miscellaneous equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...
14 CFR 121.313 - Miscellaneous equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...
An approach to operating system testing
NASA Technical Reports Server (NTRS)
Sum, R. N., Jr.; Campbell, R. H.; Kubitz, W. J.
1984-01-01
To ensure the reliability and performance of a new system, it must be verified or validated in some manner. Currently, testing is the only resonable technique available for doing this. Part of this testing process is the high level system test. System testing is considered with respect to operating systems and in particular UNIX. This consideration results in the development and presentation of a good method for performing the system test. The method includes derivations from the system specifications and ideas for management of the system testing project. Results of applying the method to the IBM System/9000 XENIX operating system test and the development of a UNIX test suite are presented.
Operator function modeling: An approach to cognitive task analysis in supervisory control systems
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1987-01-01
In a study of models of operators in complex, automated space systems, an operator function model (OFM) methodology was extended to represent cognitive as well as manual operator activities. Development continued on a software tool called OFMdraw, which facilitates construction of an OFM by permitting construction of a heterarchic network of nodes and arcs. Emphasis was placed on development of OFMspert, an expert system designed both to model human operation and to assist real human operators. The system uses a blackboard method of problem solving to make an on-line representation of operator intentions, called ACTIN (actions interpreter).
40 CFR 63.4291 - What are my options for meeting the emission limits?
Code of Federal Regulations, 2010 CFR
2010-07-01
... emission capture systems and add-on controls, the organic HAP emission rate for the web coating/printing... demonstrate that all capture systems and control devices for the web coating/printing operation(s) meet the... capture systems and control devices for the web coating/printing operation(s) meet the operating limits...
Impact of Utility-Scale Distributed Wind on Transmission-Level System Operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brancucci Martinez-Anido, C.; Hodge, B. M.
2014-09-01
This report presents a new renewable integration study that aims to assess the potential for adding distributed wind to the current power system with minimal or no upgrades to the distribution or transmission electricity systems. It investigates the impacts of integrating large amounts of utility-scale distributed wind power on bulk system operations by performing a case study on the power system of the Independent System Operator-New England (ISO-NE).
ASTER system operating achievement for 15 years on orbit
NASA Astrophysics Data System (ADS)
Inada, Hitomi; Ito, Yoshiyuki; Kikuchi, Masakuni; Sakuma, Fumihiro; Tatsumi, Kenji; Akagi, Shigeki; Ono, Hidehiko
2015-10-01
ASTER (Advanced Spaceborne Thermal Emission and Reflection Radiometer) System is operating more than 15 years since launched on board of NASA's Terra spacecraft in December 1999. ASTER System is composed of 3 radiometers (VNIR (Visible and Near Infrared Radiometer), SWIR (Short-Wave Infrared Radiometer), and TIR (Thermal Infrared Radiometer)), CSP (Common Signal Processor) and MSP (Master Power Supply). This paper describes the ASTER System operating history and the achievement of ASTER System long term operation since the initial checkout operation, the normal operation, and the continuous operation. Through the 15 years operation, ASTER system had totally checked the all subsystems (MPS, VNIR, TIR, SWIR, and CSP) health and safety check using telemetry data trend evaluation, and executed the necessary action. The watch items are monitored as the life control items. The pointing mechanics for VNIR, SWIR and TIR, and the cooler for SWIR and TIR are all operating with any problem for over 15 years. In 2003, ASTER was successfully operated for the lunar calibration. As the future plan, ASTER team is proposing the 2nd lunar calibration before the end of mission.
CLEAR: Communications Link Expert Assistance Resource
NASA Technical Reports Server (NTRS)
Hull, Larry G.; Hughes, Peter M.
1987-01-01
Communications Link Expert Assistance Resource (CLEAR) is a real time, fault diagnosis expert system for the Cosmic Background Explorer (COBE) Mission Operations Room (MOR). The CLEAR expert system is an operational prototype which assists the MOR operator/analyst by isolating and diagnosing faults in the spacecraft communication link with the Tracking and Data Relay Satellite (TDRS) during periods of realtime data acquisition. The mission domain, user requirements, hardware configuration, expert system concept, tool selection, development approach, and system design were discussed. Development approach and system implementation are emphasized. Also discussed are system architecture, tool selection, operation, and future plans.
Ultrashort-Pulse Laser System: Theory of Operation and Operating Procedures
1992-07-01
Nov 89 - Jul 92 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Ultrashort-Pulse Laser System : Theory of Operation and C - F33615-88-C-0631 Operating...i ’IR~A&, D2;" T.&B [E] al uicod [] j 0 Avhi lp.bilty C: oded’ Avail i Qiv ULTRASHORT-PULSE LASER SYSTEM : THEORY OF OPERATION AND OPERATING PROCEDURES
Solar power satellite system definition study, phase 2. Part 1: Midterm briefing
NASA Technical Reports Server (NTRS)
1979-01-01
An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.
International Space Station Alpha user payload operations concept
NASA Technical Reports Server (NTRS)
Schlagheck, Ronald A.; Crysel, William B.; Duncan, Elaine F.; Rider, James W.
1994-01-01
International Space Station Alpha (ISSA) will accommodate a variety of user payloads investigating diverse scientific and technology disciplines on behalf of five international partners: Canada, Europe, Japan, Russia, and the United States. A combination of crew, automated systems, and ground operations teams will control payload operations that require complementary on-board and ground systems. This paper presents the current planning for the ISSA U.S. user payload operations concept and the functional architecture supporting the concept. It describes various NASA payload operations facilities, their interfaces, user facility flight support, the payload planning system, the onboard and ground data management system, and payload operations crew and ground personnel training. This paper summarizes the payload operations infrastructure and architecture developed at the Marshall Space Flight Center (MSFC) to prepare and conduct ISSA on-orbit payload operations from the Payload Operations Integration Center (POIC), and from various user operations locations. The authors pay particular attention to user data management, which includes interfaces with both the onboard data management system and the ground data system. Discussion covers the functional disciplines that define and support POIC payload operations: Planning, Operations Control, Data Management, and Training. The paper describes potential interfaces between users and the POIC disciplines, from the U.S. user perspective.
2015-05-01
Director, Operational Test and Evaluation Department of Defense (DOD) Automated Biometric Identification System (ABIS) Version 1.2 Initial...Operational Test and Evaluation Report May 2015 This report on the Department of Defense (DOD) Automated Biometric Identification System...COVERED - 4. TITLE AND SUBTITLE Department of Defense (DOD) Automated Biometric Identification System (ABIS) Version 1.2 Initial Operational Test
Code of Federal Regulations, 2010 CFR
2010-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2011 CFR
2011-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
NASA Technical Reports Server (NTRS)
1985-01-01
Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.
NASA Technical Reports Server (NTRS)
Watson, Michael D.; Kelley, Gary W.
2012-01-01
The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.
Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ding, Yi; Kang, Chongqing; Wang, Jianhui
2015-03-01
The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.
Science Orders Systems and Operations Manual.
ERIC Educational Resources Information Center
Kriz, Harry M.
This manual describes the implementation and operation of SCIENCE ORDERS, an online orders management system used by the Science and Technology Department of Newman Library at Virginia Polytechnic Institute and State University. Operational since January 1985, the system is implemented using the SPIRES database management system and is used to (1)…
ERIC Educational Resources Information Center
Sanchez, Daniel J.; Reber, Paul J.
2012-01-01
The memory system that supports implicit perceptual-motor sequence learning relies on brain regions that operate separately from the explicit, medial temporal lobe memory system. The implicit learning system therefore likely has distinct operating characteristics and information processing constraints. To attempt to identify the limits of the…
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
Code of Federal Regulations, 2010 CFR
2010-07-01
... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
Code of Federal Regulations, 2014 CFR
2014-07-01
... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...
Code of Federal Regulations, 2010 CFR
2010-07-01
... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
Code of Federal Regulations, 2012 CFR
2012-07-01
... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...
Code of Federal Regulations, 2012 CFR
2012-07-01
... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...
Code of Federal Regulations, 2010 CFR
2010-07-01
... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...
Code of Federal Regulations, 2011 CFR
2011-07-01
... emission monitoring systems are operating correctly? 60.2940 Section 60.2940 Protection of Environment... monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b) Complete your...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
Code of Federal Regulations, 2013 CFR
2013-07-01
... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...
Code of Federal Regulations, 2011 CFR
2011-07-01
... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...
Code of Federal Regulations, 2014 CFR
2014-07-01
... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
Code of Federal Regulations, 2010 CFR
2010-07-01
... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...
Code of Federal Regulations, 2011 CFR
2011-07-01
... emission monitoring systems are operating correctly? 60.1730 Section 60.1730 Protection of Environment... continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or carbon dioxide...
Code of Federal Regulations, 2012 CFR
2012-07-01
... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... emission monitoring systems are operating correctly? 60.3039 Section 60.3039 Protection of Environment... emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure carbon monoxide and oxygen. (b...
Code of Federal Regulations, 2011 CFR
2011-07-01
... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...
46 CFR 111.97-5 - Electric and hydraulic power supply.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...
Code of Federal Regulations, 2013 CFR
2013-07-01
... emission monitoring systems are operating correctly? 62.15185 Section 62.15185 Protection of Environment... make sure my continuous emission monitoring systems are operating correctly? (a) Conduct initial, daily, quarterly, and annual evaluations of your continuous emission monitoring systems that measure oxygen (or...
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
9 CFR 205.101 - Certification-request and processing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... an introductory explanation of how the system will operate; (2) Identify the information which will... the system is created and operated, and the system operator is designated; (ii) All regulations, rules... certification of a system, a written request for certification must be filed together with such documents as...
9 CFR 205.101 - Certification-request and processing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... an introductory explanation of how the system will operate; (2) Identify the information which will... the system is created and operated, and the system operator is designated; (ii) All regulations, rules... certification of a system, a written request for certification must be filed together with such documents as...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Warning system operation. 234.257 Section 234.257..., Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it functions as intended when it is placed in...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Warning system operation. 234.257 Section 234.257..., Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it functions as intended when it is placed in...
Code of Federal Regulations, 2011 CFR
2011-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...
Code of Federal Regulations, 2010 CFR
2010-07-01
... meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? 62.15220 Section 62.15220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... the operation of my continuous emission monitoring systems and continuous opacity monitoring system...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, G.A.
1998-03-11
This document defines the requirements applicable to the operation, maintenance and storage of the Supervisory Control and Data Acquisition System (SCADAS) and Control Network in support of the Light Duty Utility Arm (LDUA) operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greiner, B.F.; Caswell, D.J.; Slater, W.R.
1992-04-01
This paper discusses the control system of the Tandem Accelerator Superconducting Cyclotron (TASCC) of AECL Research at its Chalk River Laboratories which is presently based on a PDP-11 computer and the IAS operating system. The estimated expense of a custom conversion of the system to a current, equivalent operating system is prohibitive. The authors have evaluated a commercial control package from VISTA Control Systems based on VAX microcomputers and the VMS operating system. Vsystem offers a modern, graphical operator interface, an extensive software toolkit for configuration of the system and a multi-feature data-logging capability, all of which far surpass themore » functionality of the present control system. However, the implementation of some familiar, practical features that TASCC operators find to be essential has proven to be challenging. The assessment of Vsystem, which is described in terms of presently perceived strengths and weaknesses, is, on balance, very positive.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... operates rolling equipment on track that is part of the general railroad system of transportation; (2) Each... is part of the general railroad system of transportation, each carrier operating or providing... operating on or off the general railroad system of transportation; (7) Each operator of private cars...
75 FR 62476 - Ultra-Wideband Transmission Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... would be obtained from measurements taken with the system operating in its normal operating mode. At the... with the transmitter operating continuously at a fundamental transmission frequency. 9. Subsequent to... systems, measured in their normal operating modes, is less than that of a UWB transmitter employing...
MIUS Integration and Subsystem Test (MIST) data system
NASA Technical Reports Server (NTRS)
Pringle, L. M.
1977-01-01
A data system for use in testing integrated subsystems of a modular integrated utility system (MIUS) is presented. The MIUS integration and subsystem test (MIST) data system is reviewed from its conception through its checkout and operation as the controlling portion of the MIST facility. The MIST data system provides a real time monitoring and control function that allows for complete evaluation of the performance of the mechanical and electrical subsystems, as well as controls the operation of the various components of the system. In addition to the aforementioned capabilities, the MIST data system provides computerized control of test operations such that minimum manpower is necessary to set up, operate, and shut down subsystems during test periods.
NASA Astrophysics Data System (ADS)
Gao, Jie; Zheng, Jianrong; Zhao, Yinghui
2017-08-01
With the rapid development of LNG vehicle in China, the operator's training and assessment of the operating skills cannot operate on material objects, because of Vehicle Gas Cylinder's high pressure, flammable and explosive characteristics. LNG Vehicle Gas Cylinder's filling simulation system with semi-physical simulation technology presents the overall design and procedures of the simulation system, and elaborates the realization of the practical analog machine, data acquisition and control system and the computer software, and introduces the design process of equipment simulation model in detail. According to the designed assessment system of the Vehicle Gas Cylinder, it can obtain the operation on the actual cylinder filling and visual effects for the operator, and automatically record operation, the results of real operation with its software, and achieve the operators' training and assessment of operating skills on mobile special equipment.
Managing computer-controlled operations
NASA Technical Reports Server (NTRS)
Plowden, J. B.
1985-01-01
A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.
A NASPAC-Based Analysis of the Delay and Cost Effects of the Dallas/Fort Worth Metroplex Plan
1992-10-01
Federal Aviation Administration Operations Research Service 14. Sponsoring Agency Code Washington, DC 20590 AOR-100 15. Supplementary Notes 16 . Abstract...LIST OF ILLUSTRATIONS Figure Page 1 DFW Area Airports 3 2 Forecasted Number of Daily Operations at DFW 12 3 Annual Savings at DFW with the Plan 16 4...Increase in System Operational Delay Without Plan 24 15 Average System Operational Delay 26 16 System Operational Delay Savings with Plan 26 17 System
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Operations Center (SOC) orbital space station research missions integration, crew requirements, SOC operations, and configurations are analyzed. Potential research and applications missions and their requirements are described. The capabilities of SOC are compared with user requirements. The SOC/space shuttle and shuttle-derived vehicle flight support operations and SOC orbital operations are described. Module configurations and systems options, SOC/external tank configurations, and configurations for geostationary orbits are described. Crew and systems safety configurations are summarized.
Advanced parking information system evaluation report
DOT National Transportation Integrated Search
1997-01-01
This report documents the evaluation analysis and results of the operational test. The evaluation assesses the impact/effect of the advance parking information system on the motoring public, parking facility operators, roadway system operations, and ...
A Framework for Adaptable Operating and Runtime Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sterling, Thomas
The emergence of new classes of HPC systems where performance improvement is enabled by Moore’s Law for technology is manifest through multi-core-based architectures including specialized GPU structures. Operating systems were originally designed for control of uniprocessor systems. By the 1980s multiprogramming, virtual memory, and network interconnection were integral services incorporated as part of most modern computers. HPC operating systems were primarily derivatives of the Unix model with Linux dominating the Top-500 list. The use of Linux for commodity clusters was first pioneered by the NASA Beowulf Project. However, the rapid increase in number of cores to achieve performance gain throughmore » technology advances has exposed the limitations of POSIX general-purpose operating systems in scaling and efficiency. This project was undertaken through the leadership of Sandia National Laboratories and in partnership of the University of New Mexico to investigate the alternative of composable lightweight kernels on scalable HPC architectures to achieve superior performance for a wide range of applications. The use of composable operating systems is intended to provide a minimalist set of services specifically required by a given application to preclude overheads and operational uncertainties (“OS noise”) that have been demonstrated to degrade efficiency and operational consistency. This project was undertaken as an exploration to investigate possible strategies and methods for composable lightweight kernel operating systems towards support for extreme scale systems.« less
ORATOS: ESA's future flight dynamics operations system
NASA Astrophysics Data System (ADS)
Dreger, Frank; Fertig, Juergen; Muench, Rolf
The Orbit and Attitude Operations System (ORATOS -- the European Space Agency's future orbit and attitude operations system -- will be in use from the mid-nineties until well beyond the year 2000. The ORATOS design is based on the experience from flight dynamics support to all past ESA missions. The ORATOS computer hardware consists of a network of powerful UNIX workstations. ORATOS resides on several hardware platforms, each comprising one or more fileservers, several client workstations and the associated communications interface hardware. The ORATOS software is structured into three layers. The flight dynamics applications layer, the support layer and the operating system layer. This architectural design separates the flight dynamics application software from the support tools and operating system facilities. It allows upgrading and replacement of operating system facilities with a minimum (or no) effect on the application layer.
Flight elements: Fault detection and fault management
NASA Technical Reports Server (NTRS)
Lum, H.; Patterson-Hine, A.; Edge, J. T.; Lawler, D.
1990-01-01
Fault management for an intelligent computational system must be developed using a top down integrated engineering approach. An approach proposed includes integrating the overall environment involving sensors and their associated data; design knowledge capture; operations; fault detection, identification, and reconfiguration; testability; causal models including digraph matrix analysis; and overall performance impacts on the hardware and software architecture. Implementation of the concept to achieve a real time intelligent fault detection and management system will be accomplished via the implementation of several objectives, which are: Development of fault tolerant/FDIR requirement and specification from a systems level which will carry through from conceptual design through implementation and mission operations; Implementation of monitoring, diagnosis, and reconfiguration at all system levels providing fault isolation and system integration; Optimize system operations to manage degraded system performance through system integration; and Lower development and operations costs through the implementation of an intelligent real time fault detection and fault management system and an information management system.
Potential Operating Orbits for Fission Electric Propulsion Systems Driven by the SAFE-400
NASA Technical Reports Server (NTRS)
Houts, Mike; Kos, Larry; Poston, David; Rodgers, Stephen L. (Technical Monitor)
2002-01-01
Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially nonradioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.
Potential operating orbits for fission electric propulsion systems driven by the SAFE-400
NASA Astrophysics Data System (ADS)
Houts, Mike; Kos, Larry; Poston, David
2002-01-01
Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp>3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified. .
NASA Astrophysics Data System (ADS)
Schaller, S. C.; Bjorklund, E. A.; Carr, G. P.; Faucett, J. A.; Oothoudt, M. A.
1997-05-01
The Los Alamos Neutron Scattering Center (LANSCE) Proton Storage Ring (PSR) control system upgrade was completed in 1996. In previous work, much of a PDP-11-based control system was replaced with Experimental Physics and Industrial Control System (EPICS) controls. Several parts of the old control system which used a VAX for operator displays and direct access to a CAMAC serial highway still remained. The old system was preserved as a "fallback" if the new EPICS-based system had problems. The control system upgrade completion included conversion of several application programs to EPICS-based operator interfaces, moving some data acquisition hardware to EPICS Input-Output Controllers (IOCs), and the implementation of new gateway software to complete the overall control system interoperability. Many operator interface (OPI) screens, written by LANSCE operators, have been incorporated in the new system. The old PSR control system hardware was removed. The robustness and reliability of the new controls obviated the need for a fallback capability.
Hickam, Christopher Dale [Glasford, IL
2008-03-18
A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
ADVANCEMENT OF THE RHIC BEAM ABORT KICKER SYSTEM.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ZHANG,W.AHRENS,L.MI,J.OERTER,B.SANDBERG,J.WARBURTON,D.
2003-05-12
As one of the most critical system for RHIC operation, the beam abort kicker system has to be highly available, reliable, and stable for the entire operating range. Along with the RHIC commission and operation, consistent efforts have been spend to cope with immediate issues as well as inherited design issues. Major design changes have been implemented to achieve the higher operating voltage, longer high voltage hold-off time, fast retriggering and redundant triggering, and improved system protection, etc. Recent system test has demonstrated for the first time that both blue ring and yellow ring beam abort systems have achieved moremore » than 24 hours hold off time at desired operating voltage. In this paper, we report break down, thyratron reverse arcing, and to build a fast re-trigger system to reduce beam spreading in event of premature discharge.« less
NASA Technical Reports Server (NTRS)
Williams-Byrd, Julie; Antol, Jeff; Jefferies, Sharon; Goodliff, Kandyce; Williams, Phillip; Ambrose, Rob; Sylvester, Andre; Anderson, Molly; Dinsmore, Craig; Hoffman, Stephen;
2016-01-01
NASA is transforming human spaceflight. The Agency is shifting from an exploration-based program with human activities in low Earth orbit (LEO) and targeted robotic missions in deep space to a more sustainable and integrated pioneering approach. However, pioneering space involves daunting technical challenges of transportation, maintaining health, and enabling crew productivity for long durations in remote, hostile, and alien environments. Subject matter experts from NASA's Human Exploration and Operations Mission Directorate (HEOMD) are currently studying a human exploration campaign that involves deployment of assets for planetary exploration. This study, called the Evolvable Mars Campaign (EMC) study, explores options with solar electric propulsion as a central component of the transportation architecture. This particular in-space transportation option often results in long duration transit to destinations. The EMC study is also investigating deployed human rated systems like landers, habitats, rovers, power systems and ISRU system to the surface of Mars, which also will involve long dormant periods when these systems are staged on the surface. In order to enable the EMC architecture, campaign and element design leads along with system and capability development experts from HEOMD's System Maturation Team (SMT) have identified additional capabilities, systems and operation modes that will sustain these systems especially during these dormant phases of the mission. Dormancy is defined by the absence of crew and relative inactivity of the systems. For EMC missions, dormant periods could range from several months to several years. Two aspects of uncrewed dormant operations are considered herein: (1) the vehicle systems that are placed in a dormant state and (2) the autonomous vehicle systems and robotic capabilities that monitor, maintain, and repair the vehicle and systems. This paper describes the mission stages of dormancy operations, phases of dormant operations, and critical system capabilities that are needed for dormant operations. This paper will compare dormancy operations of past robotic missions to identify lessons that can be applied to planned human exploration missions. Finally, this paper will also identify future work and analysis planned to assess system performance metrics and integrated system operations.
2017-03-24
for Design and Control of Adaptive Stochastic Complex Systems John Baillieul∗ Contents 1 Executive Summary 2 2 Introduction and Issues to Be Addressed...difficult of real-world Systems-of-Systems challenges is the design and operational control of medical treatment networks that support forces operating...This report describes a brief research project on foundartional aspects of systems-of-systems design and operation. The overarching goal of the
Kernel and System Procedures in Flex.
1983-08-01
System procedures on which the operating system for the Flex computer is based. These are the low level rOCedures Whbich are used to implement the compilers, file-store* coummand interpreters etc on Flex. 168 ... System procedures on which the operating system for the Flex computer is based. These are the low level procedures which are used to implement the...privileged mode. They form the interface between the user and a particular operating system written on top of the Kernel.
Strauch, Barry
2010-04-01
I discuss cultural factors and how they may influence sociotechnical system operations. Investigations of several major transportation accidents suggest that cultural factors may have played a role in the causes of the accidents. However, research has not fully addressed how cultural factors can influence sociotechnical systems. I review literature on cultural differences in general and cultural factors in sociotechnical systems and discuss how these differences can affect team performance in sociotechnical systems. Cultural differences have been observed in social and interpersonal dimensions and in cognitive and perceptual styles; these differences can affect multioperator team performance. Cultural factors may account for team errors in sociotechnical systems, most likely during high-workload, high-stress operational phases. However, much of the research on cultural factors has methodological and interpretive shortcomings that limit their applicability to sociotechnical systems. Although some research has been conducted on the role of cultural differences on team performance in sociotechnical system operations, considerable work remains to be done before the effects of these differences can be fully understood. I propose a model that illustrates how culture can interact with sociotechnical system operations and suggest avenues of future research. Given methodological challenges in measuring cultural differences and team performance in sociotechnical system operations, research in these systems should use a variety of methodologies to better understand how culture can affect multioperator team performance in these systems.
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2013 CFR
2013-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... (CONTINUED) DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop...
Code of Federal Regulations, 2014 CFR
2014-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... (CONTINUED) DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop...
Code of Federal Regulations, 2012 CFR
2012-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... (CONTINUED) DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop...
NASA Technical Reports Server (NTRS)
Havens, Glen G.
2007-01-01
MRO project is a system of systems requiring system engineering team to architect, design, integrate, test, and operate these systems at each level of the project. The challenge of system engineering mission objectives into a single mission architecture that can be integrated tested, launched, and operated. Systems engineering must translate high-level requirements into integrated mission design. Systems engineering challenges were overcome utilizing a combination by creative designs built into MRO's flight and ground systems: a) Design of sophisticated spacecraft targeting and data management capabilities b) Establishment of a strong operations team organization; c) Implementation of robust operational processes; and d) Development of strategic ground tools. The MRO system has met the challenge of its driving requirements: a) MRO began its two-year primary science phase on November 7, 2006, and by July 2007, met it minimum requirement to collect 15 Tbits of data after only eight months of operations. Currently we have collected 22 Tbits. b) Based on current performance, mission data return could return 70 Tbits of data by the end of the primary science phase in 2008.
Research and application of embedded real-time operating system
NASA Astrophysics Data System (ADS)
Zhang, Bo
2013-03-01
In this paper, based on the analysis of existing embedded real-time operating system, the architecture of an operating system is designed and implemented. The experimental results show that the design fully complies with the requirements of embedded real-time operating system, can achieve the purposes of reducing the complexity of embedded software design and improving the maintainability, reliability, flexibility. Therefore, this design program has high practical value.
1982-07-01
blocks. DISCUS has no form of hardware synchronisation between the processors. The only synchronisation is at an operating system level. ;ach processor is... operations in global store so that semaphoring on global objects can be done correctly. Write Protect is used by the operating system for read-only...the appropriate operating system program. String Handling primitives . The Z8000 has a rich set of string primitives . However as we saw before if a
Portable System for Field-feeding Greywater Remediation and Recycling
2007-03-01
for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that...system to remediate and recycle dirty sink water from its field feeding and sanitation operations . A greywater recycling system is expected to reduce...two weeks and each of the three systems was operated out-of doors treating water created during actual field feeding operations . Water samples were
Demonstration of Four Operating Capabilities to Enable a Small Aircraft Transportation System
NASA Technical Reports Server (NTRS)
Viken, Sally A.; Brooks, Frederick M.
2005-01-01
The Small Aircraft Transportation System (SATS) project has been a five-year effort fostering research and development that could lead to the transformation of our country s air transportation system. It has become evident that our commercial air transportation system is reaching its peak in terms of capacity, with numerous delays in the system and the demand keeps steadily increasing. The SATS vision is to increase mobility in our nation s transportation system by expanding access to more than 3400 small community airports that are currently under-utilized. The SATS project has focused its efforts on four key operating capabilities that have addressed new emerging technologies and procedures to pave the way for a new way of air travel. The four key operating capabilities are: Higher Volume Operations at Non-Towered/Non-Radar Airports, En Route Procedures and Systems for Integrated Fleet Operations, Lower Landing Minimums at Minimally Equipped Landing Facilities, and Increased Single Pilot Performance. These four capabilities are key to enabling low-cost, on-demand, point-to-point transportation of goods and passengers utilizing small aircraft operating from small airports. The focus of this paper is to discuss the technical and operational feasibility of the four operating capabilities and demonstrate how they can enable a small aircraft transportation system.
NASA Astrophysics Data System (ADS)
Nanaeda, Kimihiro; Mueller, Fabian; Brouwer, Jacob; Samuelsen, Scott
Operating strategies of solid oxide fuel cell (SOFC) combined heat and power (CHP) systems are developed and evaluated from a utility, and end-user perspective using a fully integrated SOFC-CHP system dynamic model that resolves the physical states, thermal integration and overall efficiency of the system. The model can be modified for any SOFC-CHP system, but the present analysis is applied to a hotel in southern California based on measured electric and heating loads. Analysis indicates that combined heat and power systems can be operated to benefit both the end-users and the utility, providing more efficient electric generation as well as grid ancillary services, namely dispatchable urban power. Design and operating strategies considered in the paper include optimal sizing of the fuel cell, thermal energy storage to dispatch heat, and operating the fuel cell to provide flexible grid power. Analysis results indicate that with a 13.1% average increase in price-of-electricity (POE), the system can provide the grid with a 50% operating range of dispatchable urban power at an overall thermal efficiency of 80%. This grid-support operating mode increases the operational flexibility of the SOFC-CHP system, which may make the technology an important utility asset for accommodating the increased penetration of intermittent renewable power.
Subsea approach to work systems development
NASA Technical Reports Server (NTRS)
Gernhardt, M. L.; Frisbie, F. R.; Brown, C. E.
1988-01-01
Self-contained undersea working environments with applications to space station EVA environments are discussed. Physiological limitations include decompression, inert gas narcosis, high-pressure nervous system, gas toxicity, and thermal limitations. Work task requirements include drilling support, construction, inspection, and repair. Work systems include hyperbaric diving, atmospheric work systems, tele-operated work systems, and hybrid systems. Each type of work system is outlined in terms of work capabilities, special interface requirements, and limitations. Various operational philosophies are discussed. The evolution of work systems in the subsea industry has been the result of direct operational experience in a competitive market.
Control and protection system for paralleled modular static inverter-converter systems
NASA Technical Reports Server (NTRS)
Birchenough, A. G.; Gourash, F.
1973-01-01
A control and protection system was developed for use with a paralleled 2.5-kWe-per-module static inverter-converter system. The control and protection system senses internal and external fault parameters such as voltage, frequency, current, and paralleling current unbalance. A logic system controls contactors to isolate defective power conditioners or loads. The system sequences contactor operation to automatically control parallel operation, startup, and fault isolation. Transient overload protection and fault checking sequences are included. The operation and performance of a control and protection system, with detailed circuit descriptions, are presented.
The CADSS design automation system. [computerized design language for small digital systems
NASA Technical Reports Server (NTRS)
Franke, E. A.
1973-01-01
This research was designed to implement and extend a previously defined design automation system for the design of small digital structures. A description is included of the higher level language developed to describe systems as a sequence of register transfer operations. The system simulator which is used to determine if the original description is correct is also discussed. The design automation system produces tables describing the state transistions of the system and the operation of all registers. In addition all Boolean equations specifying system operation are minimized and converted to NAND gate structures. Suggestions for further extensions to the system are also given.
FLEX: A Modular Software Architecture for Flight License Exam
NASA Astrophysics Data System (ADS)
Arsan, Taner; Saka, Hamit Emre; Sahin, Ceyhun
This paper is about the design and implementation of an examination system based on World Wide Web. It is called FLEX-Flight License Exam Software. We designed and implemented flexible and modular software architecture. The implemented system has basic specifications such as appending questions in system, building exams with these appended questions and making students to take these exams. There are three different types of users with different authorizations. These are system administrator, operators and students. System administrator operates and maintains the system, and also audits the system integrity. The system administrator can not be able to change the result of exams and can not take an exam. Operator module includes instructors. Operators have some privileges such as preparing exams, entering questions, changing the existing questions and etc. Students can log on the system and can be accessed to exams by a certain URL. The other characteristic of our system is that operators and system administrator are not able to delete questions due to the security problems. Exam questions can be inserted on their topics and lectures in the database. Thus; operators and system administrator can easily choose questions. When all these are taken into consideration, FLEX software provides opportunities to many students to take exams at the same time in safe, reliable and user friendly conditions. It is also reliable examination system for the authorized aviation administration companies. Web development platform - LAMP; Linux, Apache web server, MySQL, Object-oriented scripting Language - PHP are used for developing the system and page structures are developed by Content Management System - CMS.
Precise time and time interval applications to electric power systems
NASA Technical Reports Server (NTRS)
Wilson, Robert E.
1992-01-01
There are many applications of precise time and time interval (frequency) in operating modern electric power systems. Many generators and customer loads are operated in parallel. The reliable transfer of electrical power to the consumer partly depends on measuring power system frequency consistently in many locations. The internal oscillators in the widely dispersed frequency measuring units must be syntonized. Elaborate protection and control systems guard the high voltage equipment from short and open circuits. For the highest reliability of electric service, engineers need to study all control system operations. Precise timekeeping networks aid in the analysis of power system operations by synchronizing the clocks on recording instruments. Utility engineers want to reproduce events that caused loss of service to customers. Precise timekeeping networks can synchronize protective relay test-sets. For dependable electrical service, all generators and large motors must remain close to speed synchronism. The stable response of a power system to perturbations is critical to continuity of electrical service. Research shows that measurement of the power system state vector can aid in the monitoring and control of system stability. If power system operators know that a lightning storm is approaching a critical transmission line or transformer, they can modify operating strategies. Knowledge of the location of a short circuit fault can speed the re-energizing of a transmission line. One fault location technique requires clocks synchronized to one microsecond. Current research seeks to find out if one microsecond timekeeping can aid and improve power system control and operation.
Mars outpost - System and operations challenges
NASA Technical Reports Server (NTRS)
Roberts, Barney; Guerra, Lisa
1990-01-01
The paper addresses the challenges inherent in establishing an outpost on the planet Mars. For background purposes, the unique, remote Martian environment and the developmental phases of a settlement in such an environment are discussed. Challenges are identified in terms of surface systems and operations. Due to its importance to habitability, the life support system (LSS) is highlighted with various options identified. Operations for the Mars outpost, earth-based and local, are characterized by a decentralized concept. The challenge of integrating logistics analysis early in system design and operations strategy is also addressed. In order to understand and reduce the system and operations challenges, the application of terrestrial and lunar testbeds is explained.
NASA Technical Reports Server (NTRS)
Hanaway, John F.; Moorehead, Robert W.
1989-01-01
The Space Shuttle avionics system, which was conceived in the early 1970's and became operational in the 1980's represents a significant advancement of avionics system technology in the areas of systems and redundacy management, digital data base technology, flight software, flight control integration, digital fly-by-wire technology, crew display interface, and operational concepts. The origins and the evolution of the system are traced; the requirements, the constraints, and other factors which led to the final configuration are outlined; and the functional operation of the system is described. An overall system block diagram is included.
Re-Engineering of the Hubble Space Telescope (HST) to Reduce Operational Costs
NASA Technical Reports Server (NTRS)
Garvis, Michael; Dougherty, Andrew; Whittier, Wallace
1996-01-01
Satellite telemetry processing onboard the Hubble Space Telescope (HST) is carried out using dedicated software and hardware. The current ground system is expensive to operate and maintain. The mandate to reduce satellite ground system operations and maintenance costs by the year 2000 led NASA to upgrade the command and control systems in order to improve the data processing capabilities, reduce operator experience levels and increase system standardization. As a result, a command and control system product development team was formed to redesign and develop the HST ground system. The command and control system ground system development consists of six elements. The results of the prototyping phase carried out for the following of these elements are presented: the front end processor; middleware, and the graphical user interface.
A new taxonomy for distributed computer systems based upon operating system structure
NASA Technical Reports Server (NTRS)
Foudriat, E. C.
1985-01-01
Characteristics of the resource structure found in the operating system are considered as a mechanism for classifying distributed computer systems. Since the operating system resources, themselves, are too diversified to provide a consistent classification, the structure upon which resources are built and shared are examined. The location and control character of this indivisibility provides the taxonomy for separating uniprocessors, computer networks, network computers (fully distributed processing systems or decentralized computers) and algorithm and/or data control multiprocessors. The taxonomy is important because it divides machines into a classification that is relevant or important to the client and not the hardware architect. It also defines the character of the kernel O/S structure needed for future computer systems. What constitutes an operating system for a fully distributed processor is discussed in detail.
Parallel dispatch: a new paradigm of electrical power system dispatch
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, Jun Jason; Wang, Fei-Yue; Wang, Qiang
Modern power systems are evolving into sociotechnical systems with massive complexity, whose real-time operation and dispatch go beyond human capability. Thus, the need for developing and applying new intelligent power system dispatch tools are of great practical significance. In this paper, we introduce the overall business model of power system dispatch, the top level design approach of an intelligent dispatch system, and the parallel intelligent technology with its dispatch applications. We expect that a new dispatch paradigm, namely the parallel dispatch, can be established by incorporating various intelligent technologies, especially the parallel intelligent technology, to enable secure operation of complexmore » power grids, extend system operators U+02BC capabilities, suggest optimal dispatch strategies, and to provide decision-making recommendations according to power system operational goals.« less
75 FR 3228 - Notice of Commission Staff Attendance at Midwest ISO Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
.... Docket No. ER08-1043, Midwest Independent Transmission System Operator, Inc. Docket No. ER08-1074... Transmission System Operator, Inc. Docket No. ER09-1074, Midwest Independent Transmission System Operator, Inc...
Evaluation of Vehicle Detection Systems for Traffic Signal Operations
DOT National Transportation Integrated Search
2016-10-16
Typical vehicle detection systems used in traffic signal operations are comprised of inductive loop detectors. Because of costs, installation challenges, and operation and maintenance issues, many alternative non-intrusive systems have been dev...
47 CFR 90.763 - EA, Regional and nationwide system operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Frequencies in the 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide Systems § 90.763 EA, Regional and nationwide system operations. (a) A nationwide licensee... 47 Telecommunication 5 2011-10-01 2011-10-01 false EA, Regional and nationwide system operations...
49 CFR 1242.79 - Communication systems operations (account XX-55-77).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 9 2010-10-01 2010-10-01 false Communication systems operations (account XX-55-77...-Transportation § 1242.79 Communication systems operations (account XX-55-77). Separate common expenses on bases of the percentages calculated for the separation of Communication Systems (account XX-19-20), § 1242...
Describing Elementary Teachers' Operative Systems: A Case Study
ERIC Educational Resources Information Center
Dotger, Sharon; McQuitty, Vicki
2014-01-01
This case study introduces the notion of an operative system to describe elementary teachers' knowledge and practice. Drawing from complex systems theory, the operative system is defined as the network of knowledge and practices that constituted teachers' work within a lesson study cycle. Data were gathered throughout a lesson study cycle in which…
DOT National Transportation Integrated Search
1993-10-01
This document describes the Concept of Operations and Generic System Requirements for : the next generation of Traffic Management Centers (TMC). Four major steps comprise the : development of this Concept of Operations. The first step was to survey t...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2014 CFR
2014-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2013 CFR
2013-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2010 CFR
2010-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2014 CFR
2014-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2011 CFR
2011-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 29 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2012 CFR
2012-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... regulations erroneously state that an operating system such as ``Windows 2007'' may be used; there is no such operating system so this system is removed. Corrections to Regulations Implemented as Part of the 2011-2012... follows: Sec. 660.15 Equipment requirements. * * * * * (d) * * * (1) * * * (v) Operating system: Microsoft...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2013 CFR
2013-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2012 CFR
2012-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
14 CFR Appendix B to Part 27 - Airworthiness Criteria for Helicopter Instrument Flight
Code of Federal Regulations, 2011 CFR
2011-01-01
... systems that operate the required flight instruments at each pilot's station— (i) Only the required flight instruments for the first pilot may be connected to that operating system; (ii) Additional instruments, systems, or equipment may not be connected to an operating system for a second pilot unless provisions are...
78 FR 34135 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-06
...'') wishing to establish and operate pilot trading systems. Rule 19b-5 permits an SRO to [[Page 34136... describing any material changes to the system. After two years of operating such pilot trading system under... accurate record of all new pilot trading systems operated by SROs and to determine whether an SRO has...
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... recommendation of the manufacturer of the sound level measurement system. (2) In no case shall the holder or... angle that is consistent with the recommendation of the system's manufacturer. If the manufacturer of... system; highway operations. 325.37 Section 325.37 Transportation Other Regulations Relating to...
47 CFR 76.1501 - Qualifications to be an open video system operator.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Qualifications to be an open video system... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1501 Qualifications to be an open video system operator. Any person may obtain a certification to operate an open...
47 CFR 76.1501 - Qualifications to be an open video system operator.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Qualifications to be an open video system... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1501 Qualifications to be an open video system operator. Any person may obtain a certification to operate an open...
47 CFR 76.1501 - Qualifications to be an open video system operator.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Qualifications to be an open video system... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1501 Qualifications to be an open video system operator. Any person may obtain a certification to operate an open...
47 CFR 76.1501 - Qualifications to be an open video system operator.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Qualifications to be an open video system... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1501 Qualifications to be an open video system operator. Any person may obtain a certification to operate an open...
47 CFR 76.1501 - Qualifications to be an open video system operator.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Qualifications to be an open video system... RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Open Video Systems § 76.1501 Qualifications to be an open video system operator. Any person may obtain a certification to operate an open...
47 CFR 15.113 - Power line carrier systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... subject only to the following requirements: (a) A power utility operating a power line carrier system... systems to an industry-operated entity as set forth in § 90.63(g) of this chapter. No notification to the FCC is required. (b) The operating parameters of a power line carrier system (particularly the...
An expert system for benzole recovery plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ishiguro, H.; Matsumura, S.; Kawashima, A.
1993-01-01
In the By-Product Plant of NKK's Keihin Works, systematization efforts were made in 1988, including integration of the control rooms, introduction of computers and installation of automatic analyzers. This has however increased the burden on operators with a huge volume of data, and a delay in coping with an operational abnormality might expand risk and extent of damages. There is, on the other hand, a pressing need to take measures to accommodate sophisticated operations resulting from the pursuit of high productivity operation. For the purpose of avoiding these possible inconveniences, development of a real-time operation system has been tried inmore » an attempt to improve safety and operating techniques and productivity in the benzole recovery plant. An offline system based on manual entry of operating data for diagnosis of operation and abnormality was developed in 1990, and an online real-time system operating by incorporating real-time operating data was developed in 1991, which is now smoothly operating in commercial operations. This report presents an outline of the benzole recovery operation diagnosis control expert system.« less
Martinho, Graça; Gomes, Ana; Santos, Pedro; Ramos, Mário; Cardoso, João; Silveira, Ana; Pires, Ana
2017-03-01
The need to increase packaging recycling rates has led to the study and analysis of recycling schemes from various perspectives, including technical, economic, social, and environmental. This paper is part one of a three-part study devoted to comparing two recyclable packaging waste collection systems operating in western Portugal: a mixed collection system, where curbside and drop-off collections are operated simultaneously (but where the curbside system was introduced after the drop-off system), and an exclusive drop-off system. This part of the study focuses on analyzing the operation and performance of the two waste collection systems. The mixed collection system is shown to yield higher material separation rates, higher recycling rates, and lower contamination rates compared with the exclusive drop-off system, a result of the curbside component in the former system. However, the operational efficiency of the curbside collection in the mixed system is lower than the drop-off collection in the mixed system and the exclusive drop-off system, mainly because of inefficiency of collection. A key recommendation is to ensure that the systems should be optimized in an attempt to improve performance. Optimization should be applied not only to logistical aspects but also to citizens' participation, which could be improved by conducting curbside collection awareness campaigns in the neighborhoods that have a mixed system. Copyright © 2017 Elsevier Ltd. All rights reserved.
A direct-view customer-oriented digital holographic camera
NASA Astrophysics Data System (ADS)
Besaga, Vira R.; Gerhardt, Nils C.; Maksimyak, Peter P.; Hofmann, Martin R.
2018-01-01
In this paper, we propose a direct-view digital holographic camera system consisting mostly of customer-oriented components. The camera system is based on standard photographic units such as camera sensor and objective and is adapted to operate under off-axis external white-light illumination. The common-path geometry of the holographic module of the system ensures direct-view operation. The system can operate in both self-reference and self-interference modes. As a proof of system operability, we present reconstructed amplitude and phase information of a test sample.
Natural Bridges National Monument photovoltaic power plant operations manual
NASA Astrophysics Data System (ADS)
Coleman, S. D.
1982-02-01
After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.
Design and Realization of Silhouette Operation Platform Based on GIS
NASA Astrophysics Data System (ADS)
Fu, Jia; Cui, Xinqiang; Yuan, Zhengteng
2018-01-01
Artificial weather effects after several generations of unremitting efforts in many provinces, municipalities and districts have become a regular business to serve the community. In the actual operation of the actual impact of weather operations, onsite job terminal system functional integration is not high, such as the operation process cumbersome operation instructions unreasonable, the weather data lag, the data form of a single factor and other factors seriously affect the weather conditions, Sexual and intuitive improvement. Therefore, this paper adopts the Android system as the carrier for the design and implementation of the silhouette intelligent terminal system. The intelligent terminal system has carried on the preliminary deployment trial in the real-time intelligent command system which realizes the weather operation in a province, and has formed a centralized, unified and digital artificial influence in combination with the self-developed multi-function server system platform and the remote centre command system Weather operation communication network, to achieve intelligent terminal and remote centre commander between the efficient, timely and stable information exchange, improve the shadow of the economic and social benefits, basically reached the initial design purpose.
NASA Technical Reports Server (NTRS)
Hardison, David; Medina, Johnny; Dell, Greg
2016-01-01
The Earth Observer System (EOS) was officially established in 1990 and went operational in December 1999 with the launch of its flagship spacecraft Terra. Aqua followed in 2002 and Aura in 2004. All three spacecraft are still operational and producing valuable scientific data. While all are beyond their original design lifetime, they are expected to remain viable well into the 2020s. The EOS Ground System is a multi-mission system based at NASA Goddard Space Flight Center that supports science and spacecraft operations for these three missions. Over its operational lifetime to date, the EOS Ground System has evolved as needed to accommodate mission requirements. With an eye towards the future, several updates are currently being deployed. Subsystem interconnects are being upgraded to reduce data latency and improve system performance. End-of-life hardware and operating systems are being replaced to mitigate security concerns and eliminate vendor support gaps. Subsystem hardware is being consolidated through the migration to Virtual Machine based platforms. While mission operations autonomy was not a design goal of the original system concept, there is an active effort to apply state-of-the-art products from the Goddard Mission Services Evolution Center (GMSEC) to facilitate automation where possible within the existing heritage architecture. This presentation will provide background information on the EOS ground system architecture and evolution, discuss latest improvements, and conclude with the results of a recent effort that investigated how the current system could accommodate a proposed new earth science mission.
Description of the SSF PMAD DC testbed control system data acquisition function
NASA Technical Reports Server (NTRS)
Baez, Anastacio N.; Mackin, Michael; Wright, Theodore
1992-01-01
The NASA LeRC in Cleveland, Ohio has completed the development and integration of a Power Management and Distribution (PMAD) DC Testbed. This testbed is a reduced scale representation of the end to end, sources to loads, Space Station Freedom Electrical Power System (SSF EPS). This unique facility is being used to demonstrate DC power generation and distribution, power management and control, and system operation techniques considered to be prime candidates for the Space Station Freedom. A key capability of the testbed is its ability to be configured to address system level issues in support of critical SSF program design milestones. Electrical power system control and operation issues like source control, source regulation, system fault protection, end-to-end system stability, health monitoring, resource allocation, and resource management are being evaluated in the testbed. The SSF EPS control functional allocation between on-board computers and ground based systems is evolving. Initially, ground based systems will perform the bulk of power system control and operation. The EPS control system is required to continuously monitor and determine the current state of the power system. The DC Testbed Control System consists of standard controllers arranged in a hierarchical and distributed architecture. These controllers provide all the monitoring and control functions for the DC Testbed Electrical Power System. Higher level controllers include the Power Management Controller, Load Management Controller, Operator Interface System, and a network of computer systems that perform some of the SSF Ground based Control Center Operation. The lower level controllers include Main Bus Switch Controllers and Photovoltaic Controllers. Power system status information is periodically provided to the higher level controllers to perform system control and operation. The data acquisition function of the control system is distributed among the various levels of the hierarchy. Data requirements are dictated by the control system algorithms being implemented at each level. A functional description of the various levels of the testbed control system architecture, the data acquisition function, and the status of its implementationis presented.
Fundamentals and advances in the development of remote welding fabrication systems
NASA Technical Reports Server (NTRS)
Agapakis, J. E.; Masubuchi, K.; Von Alt, C.
1986-01-01
Operational and man-machine issues for welding underwater, in outer space, and at other remote sites are investigated, and recent process developments are described. Probable remote welding missions are classified, and the essential characteristics of fundamental remote welding tasks are analyzed. Various possible operational modes for remote welding fabrication are identified, and appropriate roles for humans and machines are suggested. Human operator performance in remote welding fabrication tasks is discussed, and recent advances in the development of remote welding systems are described, including packaged welding systems, stud welding systems, remotely operated welding systems, and vision-aided remote robotic welding and autonomous welding systems.
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Flores, Luis; Fleming, Land; Throop, Daiv
2002-01-01
A hybrid discrete/continuous simulation tool, CONFIG, has been developed to support evaluation of the operability life support systems. CON FIG simulates operations scenarios in which flows and pressures change continuously while system reconfigurations occur as discrete events. In simulations, intelligent control software can interact dynamically with hardware system models. CONFIG simulations have been used to evaluate control software and intelligent agents for automating life support systems operations. A CON FIG model of an advanced biological water recovery system has been developed to interact with intelligent control software that is being used in a water system test at NASA Johnson Space Center
GSFC Systems Test and Operation Language (STOL) functional requirements and language description
NASA Technical Reports Server (NTRS)
Desjardins, R.; Hall, G.; Mcguire, J.; Merwarth, P.; Mocarsky, W.; Truszkowski, W.; Villasenor, A.; Brosi, F.; Burch, P.; Carey, D.
1978-01-01
The Systems Tests and Operation Language (STOL) provides the means for user communication with payloads, applications programs, and other ground system elements. It is a systems operation language that enables an operator or user to communicate a command to a computer system. The system interprets each high level language directive from the user and performs the indicated action, such as executing a program, printing out a snapshot, or sending a payload command. This document presents the following: (1) required language features and implementation considerations; (2) basic capabilities; (3) telemetry, command, and input/output directives; (4) procedure definition and control; (5) listing, extension, and STOL nucleus capabilities.
Computer-aided operations engineering with integrated models of systems and operations
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Ryan, Dan; Fleming, Land
1994-01-01
CONFIG 3 is a prototype software tool that supports integrated conceptual design evaluation from early in the product life cycle, by supporting isolated or integrated modeling, simulation, and analysis of the function, structure, behavior, failures and operation of system designs. Integration and reuse of models is supported in an object-oriented environment providing capabilities for graph analysis and discrete event simulation. Integration is supported among diverse modeling approaches (component view, configuration or flow path view, and procedure view) and diverse simulation and analysis approaches. Support is provided for integrated engineering in diverse design domains, including mechanical and electro-mechanical systems, distributed computer systems, and chemical processing and transport systems. CONFIG supports abstracted qualitative and symbolic modeling, for early conceptual design. System models are component structure models with operating modes, with embedded time-related behavior models. CONFIG supports failure modeling and modeling of state or configuration changes that result in dynamic changes in dependencies among components. Operations and procedure models are activity structure models that interact with system models. CONFIG is designed to support evaluation of system operability, diagnosability and fault tolerance, and analysis of the development of system effects of problems over time, including faults, failures, and procedural or environmental difficulties.
NASA Astrophysics Data System (ADS)
Song, Young-Gi; Seol, Kyung-Tae; Jang, Ji-Ho; Kwon, Hyeok-Jung; Cho, Yong-Sub
2012-07-01
The Proton Engineering Frontier Project (PEFP) 20-MeV proton linear accelerator is currently operating at the Korea Atomic Energy Research Institute (KAERI). The ion source of the 100-MeV proton linac needs at least a 100-hour operation time. To meet the goal, we have developed a microwave ion source that uses no filament. For the ion source, a remote control system has been developed by using experimental physics and the industrial control system (EPICS) software framework. The control system consists of a versa module europa (VME) and EPICS-based embedded applications running on a VxWorks real-time operating system. The main purpose of the control system is to control and monitor the operational variables of the components remotely and to protect operators from radiation exposure and the components from critical problems during beam extraction. We successfully performed the operation test of the control system to confirm the degree of safety during the hardware performance.
Time warp operating system version 2.7 internals manual
NASA Technical Reports Server (NTRS)
1992-01-01
The Time Warp Operating System (TWOS) is an implementation of the Time Warp synchronization method proposed by David Jefferson. In addition, it serves as an actual platform for running discrete event simulations. The code comprising TWOS can be divided into several different sections. TWOS typically relies on an existing operating system to furnish some very basic services. This existing operating system is referred to as the Base OS. The existing operating system varies depending on the hardware TWOS is running on. It is Unix on the Sun workstations, Chrysalis or Mach on the Butterfly, and Mercury on the Mark 3 Hypercube. The base OS could be an entirely new operating system, written to meet the special needs of TWOS, but, to this point, existing systems have been used instead. The base OS's used for TWOS on various platforms are not discussed in detail in this manual, as they are well covered in their own manuals. Appendix G discusses the interface between one such OS, Mach, and TWOS.
Autonomous Payload Operations Onboard the International Space Station
NASA Technical Reports Server (NTRS)
Stetson, Howard K.; Deitsch, David K.; Cruzen, Craig A.; Haddock, Angie T.
2007-01-01
Operating the International Space Station (ISS) involves many complex crew tended, ground operated and combined systems. Over the life of the ISS program, it has become evident that by having automated and autonomous systems on board, more can be accomplished and at the same time reduce the workload of the crew and ground operators. Engineers at the National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center in Huntsville Alabama, working in collaboration with The Charles Stark Draper Laboratory have developed an autonomous software system that uses the Timeliner User Interface Language and expert logic to continuously monitor ISS payload systems, issue commands and signal ground operators as required. This paper describes the development history of the system, its concept of operation and components. The paper also discusses the testing process as well as the facilities used to develop the system. The paper concludes with a description of future enhancement plans for use on the ISS as well as potential applications to Lunar and Mars exploration systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... inflatable lifesaving appliances and marine evacuation systems? 150.506 Section 150.506 Navigation and...: OPERATIONS Emergency and Specialty Equipment Inflatable Lifesaving Appliances § 150.506 When must the operator service inflatable lifesaving appliances and marine evacuation systems? (a) The operator must...
NASA Technical Reports Server (NTRS)
Kopardekar, Parimal Hemchandra
2015-01-01
Many UAS will operate at lower altitude (Class G, below 2000 feet). There is an urgent need for a system for civilian low-altitude airspace and UAS operations. Stakeholders want to work with NASA to enable safe operations.
NASA Technical Reports Server (NTRS)
Kopardekar, Parimal H.
2015-01-01
Many UAS will operate at lower altitude (Class G, below 2000 feet)There is urgent need for a system for civilian low-altitude airspace and UAS operations. Stakeholders want to work with NASA to enable safe operations.
40 CFR 63.11583 - What are my monitoring requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... preparation operation are in target HAP service: (a) Operate a bag leak detection system with alarm that will alert operators of a leak in the control device filter material. If a bag leak detection system with... install, calibrate, operate, and maintain each bag leak detection system and alarm according to...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Mechanical engine order telegraph systems; operation. 113.35-13 Section 113.35-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED...-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25... appendix C, assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25... appendix C, assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25..., assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane Flight Manual...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25..., assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane Flight Manual...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power boost and power-operated control...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power boost and power-operated control...
Karimi, D; Henry, J; Mann, D D
2012-10-01
Tractor operators are prone to neck and back discomfort and disorders. It is well known that awkward posture is a major contributor to this problem. Previous studies have investigated the prevalence of awkward posture and the resulting discomfort and disorders among tractor operators. They have also suggested various ways to mitigate this problem. With the introduction of new autosteer guidance systems, the tractor operator is relieved from the task of steering the tractor for most of the time during field work. Therefore, it is expected that the operator's posture will change. The goal of this study was to investigate the changes in the eye-glance behavior and posture of tractor operators as a result of using autosteer guidance systems. An eye-tracking system and a camcorder were used to record the eye-glance behavior and posture of 13 tractor operators as they performed seeding operations. The experiment with each operator consisted of two sessions. In one session, the operator used an autosteer system, while in the other session the operator steered the tractor manually. Analysis of the data showed that the eye-glance behavior and posture of the operators were significantly different between the autosteer and manual steering sessions. With the autosteer system, the operators spent less time in an awkward posture, and they changed their posture less frequently. However, even with the autosteer system, the operators spent 1/3 of their time in an awkward posture. Subjective feedback from the operators indicated that more than half of them experienced back or neck/shoulder discomfort during or after seeding. It is essential that the recommendations of the previous studies, such as using large rear-view mirrors or a rotating tractor seat, be evaluated when the operator is using an autosteer system. Other tools, such as video cameras that show the attached equipment, should also be tested to evaluate their effectiveness in reducing the operator's exposure to awkward postures.
Permanent magnet synchronous motor servo system control based on μC/OS
NASA Astrophysics Data System (ADS)
Shi, Chongyang; Chen, Kele; Chen, Xinglong
2015-10-01
When Opto-Electronic Tracking system operates in complex environments, every subsystem must operate efficiently and stably. As a important part of Opto-Electronic Tracking system, the performance of PMSM(Permanent Magnet Synchronous Motor) servo system affects the Opto-Electronic Tracking system's accuracy and speed greatly[1][2]. This paper applied embedded real-time operating system μC/OS to the control of PMSM servo system, implemented SVPWM(Space Vector Pulse Width Modulation) algorithm in PMSM servo system, optimized the stability of PMSM servo system. Pointing on the characteristics of the Opto-Electronic Tracking system, this paper expanded μC/OS with software redundancy processes, remote debugging and upgrading. As a result, the Opto- Electronic Tracking system performs efficiently and stably.
CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
E.F. Loros
2000-06-28
The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installingmore » the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.« less
Advanced spacecraft fuel cell systems
NASA Technical Reports Server (NTRS)
Thaller, L. H.
1972-01-01
The development and characteristics of advanced spacecraft fuel cell systems are discussed. The system is designed to operate on low pressure, propulsion grade hydrogen and oxygen. The specific goals are 10,000 hours of operation with refurbishment, 20 pounds per kilowatt at a sustained power of 7 KW, and 21 KW peaking capability for durations of two hours. The system rejects waste heat to the spacecraft cooling system at power levels up to 7 KW. At higher powers, the system automatically transfers to open cycle operation with overboard steam venting.
2015-01-01
system that would help in adverse weather conditions. U.S. operations in Bosnia, which were run from a relatively austere airfield with limited air... operations beginning in 2013 (CVN21, Joint Strike Fighter, Joint Unmanned Combat Air System ). cAccording to multiple FAA ofcial planning documents...Positioning System Next Generation Operational Control System HMS Handheld, Manpack and Small Form Fit HUD Head up Display IAMD Integrated Air and
Initial Design and Construction of a Mobil Regenerative Fuel Cell System
NASA Technical Reports Server (NTRS)
Colozza, Anthony J.; Maloney, Thomas; Hoberecht, Mark (Technical Monitor)
2003-01-01
The design and initial construction of a mobile regenerative power system is described. The main components of the power system consists of a photovoltaic array, regenerative fuel cell and electrolyzer. The system is mounted on a modified landscape trailer and is completely self contained. An operational analysis is also presented that shows predicted performance for the system at various times of the year. The operational analysis consists of performing an energy balance on the system based on array output and total desired operational time.
Systems and Methods for Collaboratively Controlling at Least One Aircraft
NASA Technical Reports Server (NTRS)
Estkowski, Regina I. (Inventor)
2016-01-01
An unmanned vehicle management system includes an unmanned aircraft system (UAS) control station controlling one or more unmanned vehicles (UV), a collaborative routing system, and a communication network connecting the UAS and the collaborative routing system. The collaborative routing system being configured to receive flight parameters from an operator of the UAS control station and, based on the received flight parameters, automatically present the UAS control station with flight plan options to enable the operator to operate the UV in a defined airspace.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baumbaugh, A.; Briegel, C.; Brown, B.C.
2011-11-01
A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. Themore » system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.« less
NASA Astrophysics Data System (ADS)
Baumbaugh, A.; Briegel, C.; Brown, B. C.; Capista, D.; Drennan, C.; Fellenz, B.; Knickerbocker, K.; Lewis, J. D.; Marchionni, A.; Needles, C.; Olson, M.; Pordes, S.; Shi, Z.; Still, D.; Thurman-Keup, R.; Utes, M.; Wu, J.
2011-11-01
A VME-based data acquisition system for beam-loss monitors has been developed and is in use in the Tevatron and Main Injector accelerators at the Fermilab complex. The need for enhanced beam-loss protection when the Tevatron is operating in collider-mode was the main driving force for the new design. Prior to the implementation of the present system, the beam-loss monitor system was disabled during collider operation and protection of the Tevatron magnets relied on the quench protection system. The new Beam-Loss Monitor system allows appropriate abort logic and thresholds to be set over the full set of collider operating conditions. The system also records a history of beam-loss data prior to a beam-abort event for post-abort analysis. Installation of the Main Injector system occurred in the fall of 2006 and the Tevatron system in the summer of 2007. Both systems were fully operation by the summer of 2008. In this paper we report on the overall system design, provide a description of its normal operation, and show a number of examples of its use in both the Main Injector and Tevatron.
Computer-Aided Modeling and Analysis of Power Processing Systems (CAMAPPS), phase 1
NASA Technical Reports Server (NTRS)
Kim, S.; Lee, J.; Cho, B. H.; Lee, F. C.
1986-01-01
The large-signal behaviors of a regulator depend largely on the type of power circuit topology and control. Thus, for maximum flexibility, it is best to develop models for each functional block a independent modules. A regulator can then be configured by collecting appropriate pre-defined modules for each functional block. In order to complete the component model generation for a comprehensive spacecraft power system, the following modules were developed: solar array switching unit and control; shunt regulators; and battery discharger. The capability of each module is demonstrated using a simplified Direct Energy Transfer (DET) system. Large-signal behaviors of solar array power systems were analyzed. Stability of the solar array system operating points with a nonlinear load is analyzed. The state-plane analysis illustrates trajectories of the system operating point under various conditions. Stability and transient responses of the system operating near the solar array's maximum power point are also analyzed. The solar array system mode of operation is described using the DET spacecraft power system. The DET system is simulated for various operating conditions. Transfer of the software program CAMAPPS (Computer Aided Modeling and Analysis of Power Processing Systems) to NASA/GSFC (Goddard Space Flight Center) was accomplished.