NASCOM system development plan: System description, capabilities, and plans, FY 94-2
NASA Technical Reports Server (NTRS)
1994-01-01
The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.
Planning Systems for Distributed Operations
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.
49 CFR 659.25 - Annual review of system safety program plan and system security plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...
49 CFR 659.23 - System security plan: contents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: contents. 659.23 Section 659... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at a... system security plan; and (e) Document the rail transit agency's process for making its system security...
Hybrid Motion Planning with Multiple Destinations
NASA Technical Reports Server (NTRS)
Clouse, Jeffery
1998-01-01
In our initial proposal, we laid plans for developing a hybrid motion planning system that combines the concepts of visibility-based motion planning, artificial potential field based motion planning, evolutionary constrained optimization, and reinforcement learning. Our goal was, and still is, to produce a hybrid motion planning system that outperforms the best traditional motion planning systems on problems with dynamic environments. The proposed hybrid system will be in two parts the first is a global motion planning system and the second is a local motion planning system. The global system will take global information about the environment, such as the placement of the obstacles and goals, and produce feasible paths through those obstacles. We envision a system that combines the evolutionary-based optimization and visibility-based motion planning to achieve this end.
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
Intelligent control of a planning system for astronaut training.
Ortiz, J; Chen, G
1999-07-01
This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.
Basic Concepts Required in the Development of a Planning Information System.
ERIC Educational Resources Information Center
Kennedy, F. D.
This report, the result of developmental research on a planning information system for North Carolina, describes the planning process at higher levels of State government, defines a general information system and derives a planning information system from various types of planning, provides guidelines for system design and evaluation, and…
Eleventh Annual Report of Accomplishments Under the Airport Improvement Program
1992-01-01
552,860 INSTALL SECURITY SYSTEM PORTLAND INTERNATIONAL JETPORT (PRIMARY) 25 $255, 195 CONSTRUCT ACCESS ROAD PRESQUE ISLE 09 $988,548 CONSTRUCT AIRCRAFT...TAXIWAYS; INSTALL VISUAL APPROACH AIDS PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA S7 $89,050 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) DELAWARE...VALLEY REGION RA $195,030 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) SOUTHWESTERN PENNSYLVANIA REGION RA $310,950 CONDUCT REGIONAL SYSTEM PLAN
Strategic Planning and Information Systems.
ERIC Educational Resources Information Center
Shuman, Jack N.
1982-01-01
Discusses the functions of business planning systems and analyzes the underlying assumptions of the information systems that support strategic planning efforts within organizations. Development of a system framework, obstacles to the successful creation of strategic planning information systems, and resource allocation in organizations are…
48 CFR 7.106 - Additional requirements for major systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...
48 CFR 7.106 - Additional requirements for major systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...
48 CFR 7.106 - Additional requirements for major systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...
48 CFR 7.106 - Additional requirements for major systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...
48 CFR 7.106 - Additional requirements for major systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (b) In planning for the solicitation of a major system (see part 34) production contract, planners... REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.106 Additional requirements for major systems. (a) In planning for the solicitation of a major system (see part 34) development contract...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
49 CFR 659.19 - System safety program plan: contents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false System safety program plan: contents. 659.19... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.19 System safety program plan: contents. The system safety plan shall...
3D treatment planning systems.
Saw, Cheng B; Li, Sicong
2018-01-01
Three-dimensional (3D) treatment planning systems have evolved and become crucial components of modern radiation therapy. The systems are computer-aided designing or planning softwares that speed up the treatment planning processes to arrive at the best dose plans for the patients undergoing radiation therapy. Furthermore, the systems provide new technology to solve problems that would not have been considered without the use of computers such as conformal radiation therapy (CRT), intensity-modulated radiation therapy (IMRT), and volumetric modulated arc therapy (VMAT). The 3D treatment planning systems vary amongst the vendors and also the dose delivery systems they are designed to support. As such these systems have different planning tools to generate the treatment plans and convert the treatment plans into executable instructions that can be implemented by the dose delivery systems. The rapid advancements in computer technology and accelerators have facilitated constant upgrades and the introduction of different and unique dose delivery systems than the traditional C-arm type medical linear accelerators. The focus of this special issue is to gather relevant 3D treatment planning systems for the radiation oncology community to keep abreast of technology advancement by assess the planning tools available as well as those unique "tricks or tips" used to support the different dose delivery systems. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
Manager's assistant systems for space system planning
NASA Technical Reports Server (NTRS)
Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James
1992-01-01
This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.
Iowa in motion : transit system plan : implementing Iowa's state transportation plan
DOT National Transportation Integrated Search
1999-09-14
The Iowa Transit System Plan was developed as a result of the on-going long-range transportation planning process known as Iowa In Motion This planning document, the 1999 Iowa Transit System Plan, is the result of this continuing planning process and...
[Remote radiation planning support system].
Atsumi, Kazushige; Nakamura, Katsumasa; Yoshidome, Satoshi; Shioyama, Yoshiyuki; Sasaki, Tomonari; Ohga, Saiji; Yoshitake, Tadamasa; Shinoto, Makoto; Asai, Kaori; Sakamoto, Katsumi; Hirakawa, Masakazu; Honda, Hiroshi
2012-08-01
We constructed a remote radiation planning support system between Kyushu University Hospital (KUH) in Fukuoka and Kyushu University Beppu Hospital (KBH) in Oita. Between two institutions, radiology information system for radiotherapy division (RT-RIS) and radiation planning system (RTPS) were connected by virtual private network (VPN). This system enables the radiation oncologists at KUH to perform radiotherapy planning for the patients at KBH. The detail of the remote radiation planning support system in our institutions is as follows: The radiation oncologist at KBH performs radiotherapy planning and the data of the patients are sent anonymously to the radiation oncologists at KUH. The radiation oncologists at KUH receive the patient's data, access to RTPS at KBH, verify or change the radiation planning at KBH: Radiation therapy is performed at KBH according to the confirmed plan by the radiation oncologists at KUH. Our remote radiation planning system is useful for providing radiation therapy with safety and accuracy.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
...; Notice of Filing of the Third Amendment to the National Market System Plan to Address Extraordinary... following parties to the National Market System Plan: BATS Exchange, Inc., BATS Y- Exchange, Inc., Chicago... preparing, filing, and implementing national market system plans. I. Definitions (A) ``Eligible Reported...
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Astrophysics Data System (ADS)
Suleiman, Lina
2017-04-01
Planners and policymakers' concern escalates over conventional systems dealing with rains in cities based on domination and control of nature rather than harmony and design with nature. A new spatial planning paradigm is needed to put in place systems which mimic natural water systems and promise multiple values instead of systems consider rain as a source of problem. However, such approach embodies significant planning challenges. Urban rain harvesting systems (URHs) are inherently viewed as 'sociotechnical' systems. As such, planning processes should consider the interdependence of 'social' and 'technical' aspects as essential elements if a transition towards sustainable urban water systems is to be realised. Drawing on a common understanding for what urban rain harvesting systems should deliver in terms of 'functions' and 'added values', a generic planning framework is developed to inform practitioners on how the 'socio' and 'technical' elements should be assimilated in a long-term and integrated planning processes of URHs. Using the developed framework, the paper examines the planning and maintenance processes of urban rain harvesting systems in Årstafältet and Hammarby Sjöstad respectively. Results show that planners lack a common operational understanding on how these systems should be designed holistically in a long term and integrated planning processes creating working gabs or positional conflicts. In practice, urban planners and water engineers look at these systems as either urban design component or water drainage system to deal with technical functions hindering a smooth transition path towards urban rain harvesting systems. The paper concludes on the urgency for reordering roles and relations within a new set-up organisation to incubate these systems in long-term planning and maintenance processes. Key words: 'Sociotechnical' system, Water, Planning, Urban Rain Harvesting systems (URHs), Hammarby Sjostad and Årstafältet
Intensity modulated neutron radiotherapy optimization by photon proxy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Snyder, Michael; Hammoud, Ahmad; Bossenberger, Todd
2012-08-15
Purpose: Introducing intensity modulation into neutron radiotherapy (IMNRT) planning has the potential to mitigate some normal tissue complications seen in past neutron trials. While the hardware to deliver IMNRT plans has been in use for several years, until recently the IMNRT planning process has been cumbersome and of lower fidelity than conventional photon plans. Our in-house planning system used to calculate neutron therapy plans allows beam weight optimization of forward planned segments, but does not provide inverse optimization capabilities. Commercial treatment planning systems provide inverse optimization capabilities, but currently cannot model our neutron beam. Methods: We have developed a methodologymore » and software suite to make use of the robust optimization in our commercial planning system while still using our in-house planning system to calculate final neutron dose distributions. Optimized multileaf collimator (MLC) leaf positions for segments designed in the commercial system using a 4 MV photon proxy beam are translated into static neutron ports that can be represented within our in-house treatment planning system. The true neutron dose distribution is calculated in the in-house system and then exported back through the MATLAB software into the commercial treatment planning system for evaluation. Results: The planning process produces optimized IMNRT plans that reduce dose to normal tissue structures as compared to 3D conformal plans using static MLC apertures. The process involves standard planning techniques using a commercially available treatment planning system, and is not significantly more complex than conventional IMRT planning. Using a photon proxy in a commercial optimization algorithm produces IMNRT plans that are more conformal than those previously designed at our center and take much less time to create. Conclusions: The planning process presented here allows for the optimization of IMNRT plans by a commercial treatment planning optimization algorithm, potentially allowing IMNRT to achieve similar conformality in treatment as photon IMRT. The only remaining requirements for the delivery of very highly modulated neutron treatments are incremental improvements upon already implemented hardware systems that should be readily achievable.« less
Design and realization of high quality prime farmland planning and management information system
NASA Astrophysics Data System (ADS)
Li, Manchun; Liu, Guohong; Liu, Yongxue; Jiang, Zhixin
2007-06-01
The article discusses the design and realization of a high quality prime farmland planning and management information system based on SDSS. Models in concept integration, management planning are used in High Quality Prime Farmland Planning in order to refine the current model system and the management information system is deigned with a triangular structure. Finally an example of Tonglu county high quality prime farmland planning and management information system is introduced.
Planning Systems. SPEC Kit 13.
ERIC Educational Resources Information Center
Association of Research Libraries, Washington, DC. Office of Management Studies.
This kit on planning systems updates a 1974 Management Studies Office Systems and Procedures Exchange Center (SPEC) kit in which developments in planning activities among Association of Research Libraries (ARL) were reviewed. At the time of the original study, in 1972, planning techniques and systems were a subject of much interest because rising…
49 CFR 659.21 - System security plan: general requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum, complies...
Bandayrel, Kristofer; Lapinsky, Stephen; Christian, Michael
2013-06-01
To assess local, state, federal, and global pandemic influenza preparedness by identifying pandemic plans at the local, state, federal, and global levels, and to identify any information technology (IT) systems in these plans to support critical care triage during an influenza pandemic in the Canadian province of Ontario. The authors used advanced MEDLINE and Google search strategies and conducted a comprehensive review of key pandemic influenza Web sites. Descriptive data extraction and analysis for IT systems were conducted on all of the included pandemic plans. A total of 155 pandemic influenza plans were reviewed: 29 local, 62 state, 63 federal, and 1 global. We found 70 plans that examined IT systems (10 local, 33 state, 26 federal, 1 global), and 85 that did not (19 local, 29 state, 37 federal). Of the 70 plans, 64 described surveillance systems (10 local, 32 state, 21 federal, 1 global), 2 described patient data collection systems (1 state, 1 federal); 4 described other types of IT systems (4 federal), and none were intended for triage. Although several pandemic plans have been drafted, the majority are high-level general documents that do not describe IT systems. The plans that discuss IT systems focus strongly on surveillance, which fails to recognize the needs of a health care system responding to an influenza pandemic. The best examples of the types of IT systems to guide decision making during a pandemic were found in the Kansas and the Czech Republic pandemic plans, because these systems were designed to collect both patient and surveillance data. Although Ontario has yet to develop such an IT system, several IT systems are in place that could be leveraged to support critical care triage and medical response during an influenza pandemic.
Preliminary logging analysis system (PLANS): overview.
R.H. Twito; S.E. Reutebuch; R.J. McGaughey; C.N. Mann
1987-01-01
The paper previews a computer-aided design system, PLANS, that is useful for developing timber harvest and road network plans on large-scale topographic maps. Earlier planning techniques are reviewed, and the advantages are explained of using advanced planning systems like PLANS. There is a brief summary of the input, output, and function of each program in the PLANS...
A plan for structured management of the Systems Approach to Training (SAT) process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schurman, D.L.
1987-01-01
This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.
Onboard autonomous mission re-planning for multi-satellite system
NASA Astrophysics Data System (ADS)
Zheng, Zixuan; Guo, Jian; Gill, Eberhard
2018-04-01
This paper presents an onboard autonomous mission re-planning system for Multi-Satellites System (MSS) to perform onboard re-planing in disruptive situations. The proposed re-planning system can deal with different potential emergency situations. This paper uses Multi-Objective Hybrid Dynamic Mutation Genetic Algorithm (MO-HDM GA) combined with re-planning techniques as the core algorithm. The Cyclically Re-planning Method (CRM) and the Near Real-time Re-planning Method (NRRM) are developed to meet different mission requirements. Simulations results show that both methods can provide feasible re-planning sequences under unforeseen situations. The comparisons illustrate that using the CRM is average 20% faster than the NRRM on computation time. However, by using the NRRM more raw data can be observed and transmitted than using the CRM within the same period. The usability of this onboard re-planning system is not limited to multi-satellite system. Other mission planning and re-planning problems related to autonomous multiple vehicles with similar demands are also applicable.
Accomplishments Under the Airport Improvement Program. Fiscal year 1987.
1987-01-01
APRON PORTLAND INTERNATIONAL JETPORT (PRIMARY) 17 $312,300 INSTALL RUNWAY LIGHTING SYSTEM 1B $1,481,738 EXTENDAPRON PRESQUE ISLE 06 $99,000 RECONSTRUCT...LOCATION AND PROJECT FEDERAL NAME OF AIRPORT NUMBER FUNDS DESCRIPTION OF WORK o PENNSYLVANIA S4 $198,000 CONDUCT STATE SYSTEM PLAN UPDATE COMMONWEALTH...OF PENNSYLVANIA (CONTINUOUS) (SYSTEM PLAN) R5 $200,000 CONDUCT REGIONAL SYSTEM PLAN UPDATE DELAWARE VALLEY REGION (CONTINUOUS) (SYSTEM PLAN) RS
Cost-Benefit Analysis of the Officer Career Information and Planning System
1980-08-01
information without the use of a computer. - vii COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFOýKATTON AND PLANNING SYSTEM CONTENTS Page INTRODUCTION ...OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM INTRODUCTION The implementation of the Officer Personnel Management System (OPMS) has...Research Report 1256 I / COST-BENEFIT ANALYSIS OF THE OFFICER CAREER INFORMATION AND PLANNING SYSTEM Roger A. Myers, Peter C. Cairo, K - Jon A
Yap, Glenn A; Platonova, Elena A; Musa, Philip F
2006-02-01
An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dietrich, Richard E.
2016-07-01
This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.
Mission planning for autonomous systems
NASA Technical Reports Server (NTRS)
Pearson, G.
1987-01-01
Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.
Samal, Janmejaya; Dehury, Ranjit Kumar
2016-05-01
Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1(st) five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11(th) five year plan. A very strong optimistic approach in spreading India's own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India's own medical inheritance for the welfare of the society at large is highly desirable.
Dehury, Ranjit Kumar
2016-01-01
Introduction Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. Objective The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. Materials and Methods A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Results Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1st five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11th five year plan. Conclusion A very strong optimistic approach in spreading India’s own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India’s own medical inheritance for the welfare of the society at large is highly desirable. PMID:27437245
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...
DOT National Transportation Integrated Search
1996-08-01
This Program Plan for the Advanced Rural Transportation Systems (ARTS) implements the goals and objectives established in the U.S. Department of Transportations (USDOTs) Strategic Plan for the ARTS. This Program Plan proposes five years (FY 97...
Louisiana Airport System Plan.
DOT National Transportation Integrated Search
1992-10-01
This report is a non-technical summary of the update to the Louisiana Airport System Plan. The system plan identifies the location, service level, and role of the 81 airports included in the plan and the costs to develop individual airports and the a...
ERIC Educational Resources Information Center
Harari, Haim
Israel's current higher education system and projections for the future are examined. Higher education planning is also discussed, with attention to the establishment of the Planning and Grants Committee, basic data for system planning, and problems requiring decisions. Information on institutions, students, and budgets is provided, including…
Iowa in motion : aviation system plan : implementing Iowa's state transportation plan
DOT National Transportation Integrated Search
1999-09-14
Iowa's system of airports provides a variety of services vital to the state's economy and is an integral part of Iowa's overall transportation system. This 1999 Iowa Aviation System Plan (IASP) addresses issues concerning the state's investment in av...
Is health systems integration being advanced through Local Health District planning?
Saunders, Carla; Carter, David J
2017-05-01
Objective Delivering genuine integrated health care is one of three strategic directions in the New South Wales (NSW) Government State Health Plan: Towards 2021. This study investigated the current key health service plan of each NSW Local Health District (LHD) to evaluate the extent and nature of health systems integration strategies that are currently planned. Methods A scoping review was conducted to identify common key principles and practices for successful health systems integration to enable the development of an appraisal tool to content assess LHD strategic health service plans. Results The strategies that are planned for health systems integration across LHDs focus most often on improvements in coordination, health care access and care delivery for complex at-risk patients across the care continuum by both state- and commonwealth-funded systems, providers and agencies. The most common reasons given for integrated activities were to reduce avoidable hospitalisation, avoid inappropriate emergency department attendance and improve patient care. Conclusions Despite the importance of health systems integration and finding that all NSW LHDs have made some commitment towards integration in their current strategic health plans, this analysis suggests that health systems integration is in relatively early development across NSW. What is known about the topic? Effective approaches to managing complex chronic diseases have been found to involve health systems integration, which necessitates sound communication and connection between healthcare providers across community and hospital settings. Planning based on current health systems integration knowledge to ensure the efficient use of scarce resources is a responsibility of all health systems. What does this paper add? Appropriate planning and implementation of health systems integration is becoming an increasingly important expectation and requirement of effective health systems. The present study is the first of its kind to assess the planned activity in health systems integration in the NSW public health system. NSW health districts play a central role in health systems integration; each health service plan outlines the strategic directions for the development and delivery of all state-funded services across each district for the coming years, equating to hundreds of millions of dollars in health sector funding. The inclusion of effective health systems integration strategies allows Local Health Districts to lay the foundation for quality patient outcomes and long-term financial sustainability despite projected increases in demand for health services. What are the implications for practice? Establishing robust ongoing mechanisms for effective health systems integration is now a necessary part of health planning. The present study identifies several key areas and strategies that are wide in scope and indicative of efforts towards health systems integration, which may support Local Health Districts and other organisations in systematic planning and implementation.
The Imperative to Integrate Air Force Command and Control Systems into Maritime Plans
2014-08-01
coopera- tion with existing C2 plans? Table. Components of C2 systems and plans C2 Systems C2 Plans People Competencies Platforms Technologies Doctrine...Intent Authorities Functions Tasks Effects C2 Systems The requirements for such a system can be expressed in terms of its components: people ...competencies, platforms, technologies, and doc- trine. The people connect to the human elements of war and leverage their particular knowledge and skills that
NASA Astrophysics Data System (ADS)
Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie
2018-02-01
This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the planner unit in realizing the budget that has been designed. It also proves that the value chain of the information planning system has brought implications for budget realization.
ERIC Educational Resources Information Center
Malinconico, S. Michael
1984-01-01
Discusses planning for the implementation of a high technology system which includes plans for how it will be phased out and an orderly transition made to its successor. System life expectations, user pressures, software modifications, commercial vendors, integrated systems, eroding economies, and replacement planning are highlighted. (EJS)
Using AI/expert system technology to automate planning and replanning for the HST servicing missions
NASA Technical Reports Server (NTRS)
Bogovich, L.; Johnson, J; Tuchman, A.; Mclean, D.; Page, B.; Kispert, A.; Burkhardt, C.; Littlefield, R.; Potter, W.
1993-01-01
This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.
ERIC Educational Resources Information Center
RULIFFSON, WILLARD ADAMS
THIS STUDY REVIEWS SOME OF THE CURRENT PLANNING PRACTICES IN SCHOOL SYSTEMS WHICH ARE CONSIDERED TO BE ALREADY INVOLVED IN LONG-RANGE PLANNING, AND DESCRIBES FURTHER LONG-RANGE TECHNIQUES WHICH COULD BE ADAPTED FOR SCHOOL SYSTEMS FROM CURRENT CORPORATE AND GOVERNMENTAL PLANNING PROCEDURES. INDIVIDUAL INTERVIEWS WERE CONDUCTED WITH SELECTED…
2013-03-01
Unmanned Aircraft Systems Flight Plan that identified small unmanned aerial systems ( SUAS ) as “a profound technological...advances in small unmanned aerial systems ( SUAS ) cooperative control. The end state objective of the research effort was to flight test an autonomous...requirements were captured in the Unmanned Aircraft Systems Flight Plan . The flight plan
Motion planning in velocity affine mechanical systems
NASA Astrophysics Data System (ADS)
Jakubiak, Janusz; Tchoń, Krzysztof; Magiera, Władysław
2010-09-01
We address the motion planning problem in specific mechanical systems whose linear and angular velocities depend affinely on control. The configuration space of these systems encompasses the rotation group, and the motion planning involves the system orientation. Derivation of the motion planning algorithm for velocity affine systems has been inspired by the continuation method. Performance of this algorithm is illustrated with examples of the kinematics of a serial nonholonomic manipulator, the plate-ball kinematics and the attitude control of a rigid body.
ERIC Educational Resources Information Center
Yu, Zuguang; Zeng, Zida
Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…
(Un)Planned Failure: Unsuccessful Succession Planning in an Urban District
ERIC Educational Resources Information Center
Peters, April L.
2011-01-01
Leader succession is often the result of a broken system, resulting in the loss of leadership gains from the exiting leader and leaving the incoming leader without proper support for success. This system needs replacing, with a system of dynamic succession planning that is carefully planned and an integral part of a school's improvement plan. To…
The Automated Logistics Element Planning System (ALEPS)
NASA Technical Reports Server (NTRS)
Schwaab, Douglas G.
1991-01-01
The design and functions of ALEPS (Automated Logistics Element Planning System) is a computer system that will automate planning and decision support for Space Station Freedom Logistical Elements (LEs) resupply and return operations. ALEPS provides data management, planning, analysis, monitoring, interfacing, and flight certification for support of LE flight load planning activities. The prototype ALEPS algorithm development is described.
Safe teleradiology: information assurance as project planning methodology
NASA Astrophysics Data System (ADS)
Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2003-05-01
This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.
The Mission Operations Planning Assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
The mission operations planning assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
Rhode Island congestion management plan : executive summary
DOT National Transportation Integrated Search
1997-09-01
This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...
Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ding, Yi; Kang, Chongqing; Wang, Jianhui
2015-03-01
The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.
Tourism and recreation system planning in Alberta provincial parks
Paul F.J. Eagles; Angela M. Gilmore; Luis X. Huang; Denise A. Keltie; Kimberley Rae; Hong Sun; Amy K. Thede; Meagan L. Wilson; Jennifer A. Woronuk; Ge Yujin
2007-01-01
Traditionally, system planning in parks and protected areas concentrated on biogeographical concepts, while neglecting tourism and recreation. The existing system plan for parks and protected areas in Alberta, Canada, divides the province into six natural regions based on a geographic classifi cation system (Grassland, Parkland, Foothills, Rocky Mountains, Boreal...
PlanWorks: A Debugging Environment for Constraint Based Planning Systems
NASA Technical Reports Server (NTRS)
Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will
2005-01-01
Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.
The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements
NASA Technical Reports Server (NTRS)
Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray
2012-01-01
In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.
Designing of network planning system for small-scale manufacturing
NASA Astrophysics Data System (ADS)
Kapulin, D. V.; Russkikh, P. A.; Vinnichenko, M. V.
2018-05-01
The paper presents features of network planning in small-scale discrete production. The procedure of explosion of the production order, considering multilevel representation, is developed. The software architecture is offered. Approbation of the network planning system is carried out. This system allows carrying out dynamic updating of the production plan.
ERIC Educational Resources Information Center
Klose, Traugott
Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…
Software Testbed for Developing and Evaluating Integrated Autonomous Systems
2015-03-01
EUROPA planning system for plan generation. The adaptive controller executes the new plan, using augmented, hierarchical finite state machines to...using the Internet Communications Engine ( ICE ), an object-oriented toolkit for building distributed applications. TABLE OF CONTENTS 1...ANML model is translated into the New Domain Definition Language (NDDL) and sent to NASA???s EUROPA planning system for plan generation. The adaptive
Automated survey of 8000 plan checks at eight facilities.
Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph
2016-09-01
To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.
40 CFR Table 4 to Subpart Hhhhhhh... - Applicability of the General Provisions to Part 63
Code of Federal Regulations, 2014 CFR
2014-07-01
... SSM plan for continuous monitoring systems No. § 63.8(c)(5) Continuous opacity monitoring system...) Written procedures for continuous monitoring systems Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required § 63.8(e) Continuous monitoring systems performance evaluation Yes...
ERIC Educational Resources Information Center
Carter, Richard B.; And Others
1991-01-01
Demonstrates how an information systems plan can be successfully developed and implemented within an academic setting. Six guidelines for information systems planning are provided; problems are identified and recommendations to address the problems are suggested; and information systems objectives are discussed, including business communications,…
A Navy Shore Activity Manpower Planning System for Civilians. Technical Report No. 24.
ERIC Educational Resources Information Center
Niehaus, R. J.; Sholtz, D.
This report describes the U.S. Navy Shore Activity Manpower Planning System (SAMPS) advanced development research project. This effort is aimed at large-scale feasibility tests of manpower models for large Naval installations. These local planning systems are integrated with Navy-wide information systems on a data-communications network accessible…
Code of Federal Regulations, 2010 CFR
2010-01-01
... ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Planning... long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and...
Guide to Developing an Environmental Management System - Plan
This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.
Planning for Downtown Circulation Systems. Volume 1. Planning Concepts.
DOT National Transportation Integrated Search
1983-10-01
This document brings together the state-of-the-art in planning concepts, methods and data for use by those cities proposing or considering comprehensive or innovative downtown circulation systems, particularly Downtown People Mover systems. DPM syste...
Real-Time Projection to Verify Plan Success During Execution
NASA Technical Reports Server (NTRS)
Wagner, David A.; Dvorak, Daniel L.; Rasmussen, Robert D.; Knight, Russell L.; Morris, John R.; Bennett, Matthew B.; Ingham, Michel D.
2012-01-01
The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.
Developing an information systems strategy for nursing.
Callanan, K M; Hughes, S J
1995-01-01
With the rapidly changing health care environment and information technology advances, organizations need to engage in strategic, planned change in order to allocate limited resources, achieve the organization's goals, and fulfill its mission [1]. One of the most important aspects of the organization's planned strategies for change concerns the information systems. The involvement of the nursing department in this process is critical. This poster presentation will communicate how nurses can develop an information systems strategic plan that will enable them to play an active role as contributors and vital participants in the strategic and business planning processes for information systems. This information systems strategy for nursing will: a) provide direction and purpose, b) guide nursing in identifying the kinds of information technology needed, c) assist in timely implementation of a system that supports nursing, and d) identify desired outcomes and benefits of an information system. The nursing information systems plan must be built on, and support, the organization's mission and business plan and integrate into the over-all information systems plans [2]. Components of the nursing strategic plan include the nursing mission statement and vision, an assessment of the current environment to identify supporting technology needed to achieve the nursing vision, expectations/anticipated outcomes, environmental considerations, and special staffing/expertise considerations. The nursing vision and mission statement is an articulation of the overall direction and purpose of the nursing organization. An assessment of the nursing organization, problem areas, opportunities for growth, the physical environment, existing systems, communications requirements, and resources is carried out to help identify areas where new technologies and automated methods of managing information could be applied. Special staffing and expertise not currently available in the organization, but necessary to the successful implementation of the plan, should be identified, and plans for filling those needs should be included in the planning and prioritization process. Based on the mission and assessment findings, goals or anticipated outcomes are developed. These goals must be realistic, financially feasible, and logistically achievable; they should also provide direction for action and decision-making [3]. Measurable objectives and detailed action plans can then be developed from these goals when implementation of this aspect of the strategic plan is begun. It is especially important, even at a strategic planning level, to consider change management techniques, including specific steps to involve individuals who will be affected by the change and to ensure open communication throughout the process. Efforts to collaborate with all affected departments and to offer input and educational opportunities to the various members of the health care team should be included in the strategic plan. A business plan describing the mission, goals, and objectives for a specific system implementation is the final step in the strategic planning process. The business plan includes expected outcomes and cost justification and may be done in cooperation with other departments (in the organization) that will be involved with this system. The business plan is used to communicate the information system's needs to the administration and governing board of the organization. With a good information systems strategy, nursing will be prepared to make more timely and better informed decisions related to applying information technology within the nursing department. The end results of this planning should be evident in the improved utilization of information technology to support the nursing vision and mission.
32 CFR 651.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) and Materiel Fielding Plans, Demilitarization/Disposal Plans, system engineering reviews/Integrated... (including NEPA) into the system acquisition strategy, milestone review planning, system engineering, and... copy and make this guidance available on the World Wide Web (WWW) and other electronic means. (13...
DOT National Transportation Integrated Search
1997-01-13
Management Advisory Memorandum on Resource Requirement Planning for Operating and Maintaining the National Airspace System (NAS) in the Federal Aviation Administration (FAA). Evaluates FAA's resource requirement planning system to ensure it accuratel...
NASA Astrophysics Data System (ADS)
Kouziokas, Georgios N.
2016-09-01
It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
Treatment planning for spinal radiosurgery : A competitive multiplatform benchmark challenge.
Moustakis, Christos; Chan, Mark K H; Kim, Jinkoo; Nilsson, Joakim; Bergman, Alanah; Bichay, Tewfik J; Palazon Cano, Isabel; Cilla, Savino; Deodato, Francesco; Doro, Raffaela; Dunst, Jürgen; Eich, Hans Theodor; Fau, Pierre; Fong, Ming; Haverkamp, Uwe; Heinze, Simon; Hildebrandt, Guido; Imhoff, Detlef; de Klerck, Erik; Köhn, Janett; Lambrecht, Ulrike; Loutfi-Krauss, Britta; Ebrahimi, Fatemeh; Masi, Laura; Mayville, Alan H; Mestrovic, Ante; Milder, Maaike; Morganti, Alessio G; Rades, Dirk; Ramm, Ulla; Rödel, Claus; Siebert, Frank-Andre; den Toom, Wilhelm; Wang, Lei; Wurster, Stefan; Schweikard, Achim; Soltys, Scott G; Ryu, Samuel; Blanck, Oliver
2018-05-25
To investigate the quality of treatment plans of spinal radiosurgery derived from different planning and delivery systems. The comparisons include robotic delivery and intensity modulated arc therapy (IMAT) approaches. Multiple centers with equal systems were used to reduce a bias based on individual's planning abilities. The study used a series of three complex spine lesions to maximize the difference in plan quality among the various approaches. Internationally recognized experts in the field of treatment planning and spinal radiosurgery from 12 centers with various treatment planning systems participated. For a complex spinal lesion, the results were compared against a previously published benchmark plan derived for CyberKnife radiosurgery (CKRS) using circular cones only. For two additional cases, one with multiple small lesions infiltrating three vertebrae and a single vertebra lesion treated with integrated boost, the results were compared against a benchmark plan generated using a best practice guideline for CKRS. All plans were rated based on a previously established ranking system. All 12 centers could reach equality (n = 4) or outperform (n = 8) the benchmark plan. For the multiple lesions and the single vertebra lesion plan only 5 and 3 of the 12 centers, respectively, reached equality or outperformed the best practice benchmark plan. However, the absolute differences in target and critical structure dosimetry were small and strongly planner-dependent rather than system-dependent. Overall, gantry-based IMAT with simple planning techniques (two coplanar arcs) produced faster treatments and significantly outperformed static gantry intensity modulated radiation therapy (IMRT) and multileaf collimator (MLC) or non-MLC CKRS treatment plan quality regardless of the system (mean rank out of 4 was 1.2 vs. 3.1, p = 0.002). High plan quality for complex spinal radiosurgery was achieved among all systems and all participating centers in this planning challenge. This study concludes that simple IMAT techniques can generate significantly better plan quality compared to previous established CKRS benchmarks.
MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitchell; Bresina, John; Hsu, Jennifer; Jonsson, Ari; Kanefsky, Bob; McCurdy, Michael; Morris, Paul; Rajan, Kanna; Vera, Alonso; Yglesias, Jeffrey
2004-01-01
This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.
1992-12-01
Ground-Based Mission Planning Systems 9 2.3 Networking Mission Planning Systems 11 2.4 Fully Automated Mission Planning I I 2.5 Unmanned Air Vehicles 13...Missile Engagement Zone RPV Remotely Piloted Vehicle MIDS Multifunction Information Distribution System RRDB Rapidly Reconfigurable Databus MIL-STD...Comrmantd OPORD Operations Order TV Television OPS Operational OR Operational Relationship UAV Unmanned Air Vehicle UAV Unnmanned Air Vehicle PA
Safe teleoperation based on flexible intraoperative planning for robot-assisted laser microsurgery.
Mattos, Leonardo S; Caldwell, Darwin G
2012-01-01
This paper describes a new intraoperative planning system created to improve precision and safety in teleoperated laser microsurgeries. It addresses major safety issues related to real-time control of a surgical laser during teleoperated procedures, which are related to the reliability and robustness of the telecommunication channels. Here, a safe solution is presented, consisting in a new planning system architecture that maintains the flexibility and benefits of real-time teleoperation and keeps the surgeon in control of all surgical actions. The developed system is based on our virtual scalpel system for robot-assisted laser microsurgery, and allows the intuitive use of stylus to create surgical plans directly over live video of the surgical field. In this case, surgical plans are defined as graphic objects overlaid on the live video, which can be easily modified or replaced as needed, and which are transmitted to the main surgical system controller for subsequent safe execution. In the process of improving safety, this new planning system also resulted in improved laser aiming precision and improved capability for higher quality laser procedures, both due to the new surgical plan execution module, which allows very fast and precise laser aiming control. Experimental results presented herein show that, in addition to the safety improvements, the new planning system resulted in a 48% improvement in laser aiming precision when compared to the previous virtual scalpel system.
State/federal interaction of LANDSAT system and related technical assistance
NASA Technical Reports Server (NTRS)
Tesser, P. A.
1981-01-01
The history of state involvement in LANDSAT systems planning and related efforts is described. Currently 16 states have visual LANDSAT capabilities and 10 others are planning on developing such capabilities. The federal government's future plans for the LANDSAT system, the impacts of recent budget decisions on the systems, and the FY 82 budget process are examined.
ERIC Educational Resources Information Center
1984
This report describes the North Carolina Department of Education's 5-year plan for establishing a statewide management information system. The system is intended to improve fiscal management, personnel administration, and administrative operations, and to ensure efficient resource use. Initial sections present highlights of the plan; background…
Exploring the Factors of an Enterprise Resource Planning System in a Local Government Organization
ERIC Educational Resources Information Center
Shaw, Bryan T.
2012-01-01
The enterprise resource planning (ERP) system industry accounts for $8.8 billion annually. Enterprise resource planning systems are not performing as expected due to implementation barriers, changes in job responsibilities, and access to information; 50% of all information technology failures are due to the implementation of ERP systems. Guided by…
NASA Technical Reports Server (NTRS)
2008-01-01
A system of software partly automates planning of a flight of the Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) -- a polarimetric synthetic-aperture radar system aboard an unpiloted or minimally piloted airplane. The software constructs a flight plan that specifies not only the intended flight path but also the setup of the radar system at each point along the path.
Nascom System Development Plan: System Description, Capabilities and Plans
NASA Technical Reports Server (NTRS)
1995-01-01
The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.
DEVELOPMENT OF A MULTIMODAL MONTE CARLO BASED TREATMENT PLANNING SYSTEM.
Kumada, Hiroaki; Takada, Kenta; Sakurai, Yoshinori; Suzuki, Minoru; Takata, Takushi; Sakurai, Hideyuki; Matsumura, Akira; Sakae, Takeji
2017-10-26
To establish boron neutron capture therapy (BNCT), the University of Tsukuba is developing a treatment device and peripheral devices required in BNCT, such as a treatment planning system. We are developing a new multimodal Monte Carlo based treatment planning system (developing code: Tsukuba Plan). Tsukuba Plan allows for dose estimation in proton therapy, X-ray therapy and heavy ion therapy in addition to BNCT because the system employs PHITS as the Monte Carlo dose calculation engine. Regarding BNCT, several verifications of the system are being carried out for its practical usage. The verification results demonstrate that Tsukuba Plan allows for accurate estimation of thermal neutron flux and gamma-ray dose as fundamental radiations of dosimetry in BNCT. In addition to the practical use of Tsukuba Plan in BNCT, we are investigating its application to other radiation therapies. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Model Checking Artificial Intelligence Based Planners: Even the Best Laid Plans Must Be Verified
NASA Technical Reports Server (NTRS)
Smith, Margaret H.; Holzmann, Gerard J.; Cucullu, Gordon C., III; Smith, Benjamin D.
2005-01-01
Automated planning systems (APS) are gaining acceptance for use on NASA missions as evidenced by APS flown On missions such as Orbiter and Deep Space 1 both of which were commanded by onboard planning systems. The planning system takes high level goals and expands them onboard into a detailed of action fiat the spacecraft executes. The system must be verified to ensure that the automatically generated plans achieve the goals as expected and do not generate actions that would harm the spacecraft or mission. These systems are typically tested using empirical methods. Formal methods, such as model checking, offer exhaustive or measurable test coverage which leads to much greater confidence in correctness. This paper describes a formal method based on the SPIN model checker. This method guarantees that possible plans meet certain desirable properties. We express the input model in Promela, the language of SPIN and express the properties of desirable plans formally.
Integrated flexible manufacturing program for manufacturing automation and rapid prototyping
NASA Technical Reports Server (NTRS)
Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.
1993-01-01
The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
Development of an expert planning system for OSSA
NASA Technical Reports Server (NTRS)
Groundwater, B.; Lembeck, M. F.; Sarsfield, L.; Diaz, Alphonso
1988-01-01
This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.
Socio-Environmental Resilience and Complex Urban Systems Modeling
NASA Astrophysics Data System (ADS)
Deal, Brian; Petri, Aaron; Pan, Haozhi; Goldenberg, Romain; Kalantari, Zahra; Cvetkovic, Vladimir
2017-04-01
The increasing pressure of climate change has inspired two normative agendas; socio-technical transitions and socio-ecological resilience, both sharing a complex-systems epistemology (Gillard et al. 2016). Socio-technical solutions include a continuous, massive data gathering exercise now underway in urban places under the guise of developing a 'smart'(er) city. This has led to the creation of data-rich environments where large data sets have become central to monitoring and forming a response to anomalies. Some have argued that these kinds of data sets can help in planning for resilient cities (Norberg and Cumming 2008; Batty 2013). In this paper, we focus on a more nuanced, ecologically based, socio-environmental perspective of resilience planning that is often given less consideration. Here, we broadly discuss (and model) the tightly linked, mutually influenced, social and biophysical subsystems that are critical for understanding urban resilience. We argue for the need to incorporate these sub system linkages into the resilience planning lexicon through the integration of systems models and planning support systems. We make our case by first providing a context for urban resilience from a socio-ecological and planning perspective. We highlight the data needs for this type of resilient planning and compare it to currently collected data streams in various smart city efforts. This helps to define an approach for operationalizing socio-environmental resilience planning using robust systems models and planning support systems. For this, we draw from our experiences in coupling a spatio-temporal land use model (the Landuse Evolution and impact Assessment Model (LEAM)) with water quality and quantity models in Stockholm Sweden. We describe the coupling of these systems models using a robust Planning Support System (PSS) structural framework. We use the coupled model simulations and PSS to analyze the connection between urban land use transformation (social) and water (environmental) systems within the context of planning for a more resilient Stockholm. This work shows that complex urban systems models can help bridge the divide between socio-technological and socio-environmental systems knowledge and achieving resilient urban areas.
Mexican humanitarian assistance system.
2016-05-26
Stabilization Mission in Haiti, SEDENA, Plan-DN-III- E , international relief system, Cluster system, Organization of American States, Conference of American...strategic plan for disaster relief—Plan DN-III- E . The plan contains annexes with specific instructions to different military actors and, because of...2FSArticuloSinPaginaLayout. 9 “Gaceta Parlamentaria 22 Apr 2010.” 10 Estado Mayor Defensa Nacional, Plan DN-III- E : Auxilio a La Poblacion Civil En Casos
Automated process planning system
NASA Technical Reports Server (NTRS)
Mann, W.
1978-01-01
Program helps process engineers set up manufacturing plans for machined parts. System allows one to develop and store library of similar parts characteristics, as related to particular facility. Information is then used in interactive system to help develop manufacturing plans that meet required standards.
Multimodal system planning technique : an analytical approach to peak period operation
DOT National Transportation Integrated Search
1995-11-01
The multimodal system planning technique described in this report is an improvement of the methodology used in the Dallas System Planning Study. The technique includes a spreadsheet-based process to identify the costs of congestion, construction, and...
National ITS Program Plan Intelligent Transportation Systems Volume I
DOT National Transportation Integrated Search
1995-03-01
ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS : THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT ...
ERIC Educational Resources Information Center
Schaumann, Leif
Intended as a companion piece to volume 7 in the Method Series, Pharmaceutical Supply System Planning (CE 024 234), this fifth of six volumes in the International Health Planning Reference Series is a combined literature review and annotated bibliography dealing with alternative methodologies for planning and analyzing pharmaceutical supply…
Board of Regents' Montana University System (MUS) Strategic Plan 2016
ERIC Educational Resources Information Center
Montana University System, 2016
2016-01-01
The Montana University System Strategic Plan is the primary planning document of the Board of Regents. The Plan sets forth an agenda for higher education in Montana by delineating the strategic directions, goals, and objectives that guide the Montana University System (MUS). In July 2006, after several years of study, public dialogue, and internal…
Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan
NASA Technical Reports Server (NTRS)
1972-01-01
A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.
Fuzzy logic based expert system for the treatment of mobile tooth.
Mago, Vijay Kumar; Mago, Anjali; Sharma, Poonam; Mago, Jagmohan
2011-01-01
The aim of this research work is to design an expert system to assist dentist in treating the mobile tooth. There is lack of consistency among dentists in choosing the treatment plan. Moreover, there is no expert system currently available to verify and support such decision making in dentistry. A Fuzzy Logic based expert system has been designed to accept imprecise and vague values of dental sign-symptoms related to mobile tooth and the system suggests treatment plan(s). The comparison of predictions made by the system with those of the dentist is conducted. Chi-square Test of homogeneity is conducted and it is found that the system is capable of predicting accurate results. With this system, dentist feels more confident while planning the treatment of mobile tooth as he can verify his decision with the expert system. The authors also argue that Fuzzy Logic provides an appropriate mechanism to handle imprecise values of dental domain.
Automated Planning and Scheduling for Planetary Rover Distributed Operations
NASA Technical Reports Server (NTRS)
Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve
1999-01-01
Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.
An efficient temporal logic for robotic task planning
NASA Technical Reports Server (NTRS)
Becker, Jeffrey M.
1989-01-01
Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.
A NASPAC-Based Analysis of the Delay and Cost Effects of the Dallas/Fort Worth Metroplex Plan
1992-10-01
Federal Aviation Administration Operations Research Service 14. Sponsoring Agency Code Washington, DC 20590 AOR-100 15. Supplementary Notes 16 . Abstract...LIST OF ILLUSTRATIONS Figure Page 1 DFW Area Airports 3 2 Forecasted Number of Daily Operations at DFW 12 3 Annual Savings at DFW with the Plan 16 4...Increase in System Operational Delay Without Plan 24 15 Average System Operational Delay 26 16 System Operational Delay Savings with Plan 26 17 System
MAPGEN Planner: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitch; Bresina, John; Charest, Leonard; Hsu, Jennifer; Jonsson, Ari K.; Kanefsky, Bob; Maldague, Pierre; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey
2003-01-01
This document describes the Mixed-initiative Activity Plan Generation system MAPGEN. The system is be- ing developed as one of the tools to be used during surface operations of NASA's Mars Exploration Rover mission (MER). However, the core technology is general and can be adapted to different missions and applications. The motivation for the system is to better support users that need to rapidly build activity plans that have to satisfy complex rules and fit within resource limits. The system therefore combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The demonstration will show the key capabilities of the automated reasoning and planning component of the system, with emphasis on how these capabilities will be used during surface operations of the MER mission.
ERIC Educational Resources Information Center
Nevada Univ. and Community Coll. System, Reno. Office of the Chancellor.
Submitted to the State Legislature by the University and Community College System of Nevada (UCCSN), this 4-year planning report reviews System outcomes for the past decade and funding priorities for 1997 to 2001. The first part provides the UCCSN mission statement, a description of strategic directions, and campus academic plans for the System's…
Space Transportation System Payloads Data and Analysis
NASA Technical Reports Server (NTRS)
Peterson, J. D.; Craft, H. G., Jr.
1975-01-01
The background, current developments and future plans for the Space Transportation System Payloads Data and Analysis (SPDA) activities at Marshall Space Flight Center are reviewed. It is shown how the payload data bank and future planned activities will interface with the payloads community and Space Transportation System designers. The interfaces with the STS data base include NASA planning, international planning, payload design, shuttle design, user agencies planning and information, and OMB, Congress and others.
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India.
Samal, Janmejaya
2015-01-01
AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1(st)5-year plan. A progressive path of development could be observed since the first to the 12(th)5-year plan. It was up to the 7(th)plan the growth was little sluggish and from 8(th)plan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11(th)5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of "Mainstreaming of AYUSH and revitalization of local health traditions" to strengthen public health services. This scheme is currently in operation in its second phase, since 1(st)April 2012, with the 12(th)5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1(st)plan to 12(th)plan, to enable reflection and throw some light into the future directions of AYUSH system.
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2012 CFR
2012-07-01
... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...
Naccarella, Lucio; Wraight, Brenda; Gorman, Des
2016-02-01
The growing demands on the health system to adapt to constant change has led to investment in health workforce planning agencies and approaches. Health workforce planning approaches focusing on identifying, predicting and modelling workforce supply and demand are criticised as being simplistic and not contributing to system-level resiliency. Alternative evidence- and needs-based health workforce planning approaches are being suggested. However, to contribute to system-level resiliency, workforce planning approaches need to also adopt system-based approaches. The increased complexity and fragmentation of the healthcare system, especially for patients with complex and chronic conditions, has also led to a focus on health literacy not simply as an individual trait, but also as a dynamic product of the interaction between individual (patients, workforce)-, organisational- and system-level health literacy. Although it is absolutely essential that patients have a level of health literacy that enables them to navigate and make decisions, so too the health workforce, organisations and indeed the system also needs to be health literate. Herein we explore whether health workforce planning is recognising the dynamic interplay between health literacy at an individual, organisation and system level, and the potential for strengthening resiliency across all those levels.
Avenues into Food Planning: A Review of Scholarly Food System Research
Brinkley, Catherine
2014-01-01
This review summarizes several avenues of planning inquiry into food systems research, revealing gaps in the literature, allied fields of study and mismatches between scholarly disciplines and the food system life cycle. Planners and scholars in associated fields have identified and defined problems in the food system as ‘wicked’ problems, complex environmental issues that require systemic solutions at the community scale. While food justice scholars have contextualized problem areas, planning scholars have made a broad case for planning involvement in solving these wicked problems while ensuring that the functional and beneficial parts of the food system continue to thrive. This review maps the entry points of scholarly interest in food systems and planning’s contributions to its study, charting a research agenda for the future. PMID:24932131
Towards a new generation of mission planning systems: Flexibility and performance
NASA Technical Reports Server (NTRS)
Gasquet, A.; Parrod, Y.; Desaintvincent, A.
1994-01-01
This paper presents some new approaches which are required for a better adequacy of Mission Planning Systems. In particular, the performance flexibility and genericity issues are discussed based on experience acquired through various Mission Planning systems developed by Matra Marconi Space.
School Planning, Evaluation and Communication System (SPECS).
ERIC Educational Resources Information Center
Flocco, Edward C.
A comprehensive school planning tool is available from General Learning Corporation and the Center for the Advanced Study of Educational Administration at the University of Oregon. This School Planning, Evaluation and Communication System (SPECS) provides a deliverable system of training, implementation strategies and materials and technical…
NASA Technical Reports Server (NTRS)
Richardson, J.; Labbe, M.; Belala, Y.; Leduc, Vincent
1994-01-01
The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.
Planning ATES systems under uncertainty
NASA Astrophysics Data System (ADS)
Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin
2015-04-01
Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions form a complex adaptive system, for which agent-based modelling provides a useful analysis framework. This study therefore explores the interactions between endogenous ATES adoption processes and the relative performance of different planning schemes, using an agent-based adoption model coupled with a hydrologic model of the subsurface. The models are parameterized to simulate typical operating conditions for ATES systems in a dense urban area. Furthermore, uncertainties relating to planning parameters, adoption processes, and climactic conditions are explicitly considered using exploratory modelling techniques. Results are therefore presented for the performance of different planning policies over a broad range of plausible scenarios.
Dichter, Jeffrey R; Kanter, Robert K; Dries, David; Luyckx, Valerie; Lim, Matthew L; Wilgis, John; Anderson, Michael R; Sarani, Babak; Hupert, Nathaniel; Mutter, Ryan; Devereaux, Asha V; Christian, Michael D; Kissoon, Niranjan
2014-10-01
System-level planning involves uniting hospitals and health systems, local/regional government agencies, emergency medical services, and other health-care entities involved in coordinating and enabling care in a major disaster. We reviewed the literature and sought expert opinions concerning system-level planning and engagement for mass critical care due to disasters or pandemics and offer suggestions for system-planning, coordination, communication, and response. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. The American College of Chest Physicians (CHEST) consensus statement development process was followed in developing suggestions. Task Force members met in person to develop nine key questions believed to be most relevant for system-planning, coordination, and communication. A systematic literature review was then performed for relevant articles and documents, reports, and other publications reported since 1993. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. Suggestions were developed and grouped according to the following thematic elements: (1) national government support of health-care coalitions/regional health authorities (HC/RHAs), (2) teamwork within HC/RHAs, (3) system-level communication, (4) system-level surge capacity and capability, (5) pediatric patients and special populations, (6) HC/RHAs and networks, (7) models of advanced regional care systems, and (8) the use of simulation for preparedness and planning. System-level planning is essential to provide care for large numbers of critically ill patients because of disaster or pandemic. It also entails a departure from the routine, independent system and involves all levels from health-care institutions to regional health authorities. National government support is critical, as are robust communication systems and advanced planning supported by realistic exercises.
System-Level Planning, Coordination, and Communication
Kanter, Robert K.; Dries, David; Luyckx, Valerie; Lim, Matthew L.; Wilgis, John; Anderson, Michael R.; Sarani, Babak; Hupert, Nathaniel; Mutter, Ryan; Devereaux, Asha V.; Christian, Michael D.; Kissoon, Niranjan; Christian, Michael D.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Rubinson, Lewis; Amundson, Dennis; Anderson, Michael R.; Balk, Robert; Barfield, Wanda D.; Bartz, Martha; Benditt, Josh; Beninati, William; Berkowitz, Kenneth A.; Daugherty Biddison, Lee; Braner, Dana; Branson, Richard D; Burkle, Frederick M.; Cairns, Bruce A.; Carr, Brendan G.; Courtney, Brooke; DeDecker, Lisa D.; De Jong, Marla J.; Dominguez-Cherit, Guillermo; Dries, David; Einav, Sharon; Erstad, Brian L.; Etienne, Mill; Fagbuyi, Daniel B.; Fang, Ray; Feldman, Henry; Garzon, Hernando; Geiling, James; Gomersall, Charles D.; Grissom, Colin K.; Hanfling, Dan; Hick, John L.; Hodge, James G.; Hupert, Nathaniel; Ingbar, David; Kanter, Robert K.; King, Mary A.; Kuhnley, Robert N.; Lawler, James; Leung, Sharon; Levy, Deborah A.; Lim, Matthew L.; Livinski, Alicia; Luyckx, Valerie; Marcozzi, David; Medina, Justine; Miramontes, David A.; Mutter, Ryan; Niven, Alexander S.; Penn, Matthew S.; Pepe, Paul E.; Powell, Tia; Prezant, David; Reed, Mary Jane; Rich, Preston; Rodriquez, Dario; Roxland, Beth E.; Sarani, Babak; Shah, Umair A.; Skippen, Peter; Sprung, Charles L.; Subbarao, Italo; Talmor, Daniel; Toner, Eric S.; Tosh, Pritish K.; Upperman, Jeffrey S.; Uyeki, Timothy M.; Weireter, Leonard J.; West, T. Eoin; Wilgis, John; Ornelas, Joe; McBride, Deborah; Reid, David; Baez, Amado; Baldisseri, Marie; Blumenstock, James S.; Cooper, Art; Ellender, Tim; Helminiak, Clare; Jimenez, Edgar; Krug, Steve; Lamana, Joe; Masur, Henry; Mathivha, L. Rudo; Osterholm, Michael T.; Reynolds, H. Neal; Sandrock, Christian; Sprecher, Armand; Tillyard, Andrew; White, Douglas; Wise, Robert; Yeskey, Kevin
2014-01-01
BACKGROUND: System-level planning involves uniting hospitals and health systems, local/regional government agencies, emergency medical services, and other health-care entities involved in coordinating and enabling care in a major disaster. We reviewed the literature and sought expert opinions concerning system-level planning and engagement for mass critical care due to disasters or pandemics and offer suggestions for system-planning, coordination, communication, and response. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS: The American College of Chest Physicians (CHEST) consensus statement development process was followed in developing suggestions. Task Force members met in person to develop nine key questions believed to be most relevant for system-planning, coordination, and communication. A systematic literature review was then performed for relevant articles and documents, reports, and other publications reported since 1993. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. RESULTS: Suggestions were developed and grouped according to the following thematic elements: (1) national government support of health-care coalitions/regional health authorities (HC/RHAs), (2) teamwork within HC/RHAs, (3) system-level communication, (4) system-level surge capacity and capability, (5) pediatric patients and special populations, (6) HC/RHAs and networks, (7) models of advanced regional care systems, and (8) the use of simulation for preparedness and planning. CONCLUSIONS: System-level planning is essential to provide care for large numbers of critically ill patients because of disaster or pandemic. It also entails a departure from the routine, independent system and involves all levels from health-care institutions to regional health authorities. National government support is critical, as are robust communication systems and advanced planning supported by realistic exercises. PMID:25144713
Wooten, H Omar; Green, Olga; Yang, Min; DeWees, Todd; Kashani, Rojano; Olsen, Jeff; Michalski, Jeff; Yang, Deshan; Tanderup, Kari; Hu, Yanle; Li, H Harold; Mutic, Sasa
2015-07-15
This work describes a commercial treatment planning system, its technical features, and its capabilities for creating (60)Co intensity modulated radiation therapy (IMRT) treatment plans for a magnetic resonance image guidance radiation therapy (MR-IGRT) system. The ViewRay treatment planning system (Oakwood Village, OH) was used to create (60)Co IMRT treatment plans for 33 cancer patients with disease in the abdominal, pelvic, thorax, and head and neck regions using physician-specified patient-specific target coverage and organ at risk (OAR) objectives. Backup plans using a third-party linear accelerator (linac)-based planning system were also created. Plans were evaluated by attending physicians and approved for treatment. The (60)Co and linac plans were compared by evaluating conformity numbers (CN) with 100% and 95% of prescription reference doses and heterogeneity indices (HI) for planning target volumes (PTVs) and maximum, mean, and dose-volume histogram (DVH) values for OARs. All (60)Co IMRT plans achieved PTV coverage and OAR sparing that were similar to linac plans. PTV conformity for (60)Co was within <1% and 3% of linac plans for 100% and 95% prescription reference isodoses, respectively, and heterogeneity was on average 4% greater. Comparisons of OAR mean dose showed generally better sparing with linac plans in the low-dose range <20 Gy, but comparable sparing for organs with mean doses >20 Gy. The mean doses for all (60)Co plan OARs were within clinical tolerances. A commercial (60)Co MR-IGRT device can produce highly conformal IMRT treatment plans similar in quality to linac IMRT for a variety of disease sites. Additional work is in progress to evaluate the clinical benefit of other novel features of this MR-IGRT system. Copyright © 2015 Elsevier Inc. All rights reserved.
SERA -- An advanced treatment planning system for neutron therapy and BNCT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nigg, D.W.; Wemple, C.A.; Wessol, D.E.
1999-09-01
Detailed treatment planning calculations on a patient-specific basis are required for boron neutron capture therapy (BNCT). Two integrated treatment planning systems developed specifically for BNCT have been in clinical use in the United States over the past few years. The MacNCTPLAN BNCT treatment planning system is used in the clinical BNCT trials that are underway at the Massachusetts Institute of Technology. A second system, BNCT{_}rtpe (BNCT radiation therapy planning environment), developed independently by the Idaho national Engineering and Environmental Laboratory (INEEL) in collaboration with Montana State University (MSU), is used for treatment planning in the current series of BNCT clinicalmore » trials for glioblastoma at Brookhaven National Laboratory (BNL). This latter system is also licensed for use at several other BNCT research facilities worldwide. Although the currently available BNCT planning systems have served their purpose well, they suffer from somewhat long computation times (2 to 3 CPU-hours or more per field) relative to standard photon therapy planning software. This is largely due to the need for explicit three-dimensional solutions to the relevant transport equations. The simplifying approximations that work well for photon transport computations are not generally applicable to neutron transport computations. Greater computational speeds for BNCT treatment planning must therefore generally be achieved through the application of improved numerical techniques rather than by simplification of the governing equations. Recent efforts at INEEL and MSU have been directed toward this goal. This has resulted in a new paradigm for this type of calculation and the subsequent creation of the new simulation environment for radiotherapy applications (SERA) treatment planning system for BNCT. SERA is currently in initial clinical testing in connection with the trials at BNL, and it is expected to replace the present BNCT{_}rtpe system upon general release during 1999.« less
Multi-community command and control systems in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.
1976-01-01
A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.
Temperature Control. Honeywell Planning Guide.
ERIC Educational Resources Information Center
Honeywell, Inc., Minneapolis, Minn.
Presents planning considerations in selecting proper temperature control systems. Various aspects are discussed including--(1) adequate environmental control, (2) adequate control area, (3) control system design, (4) operators rate their systems, (5) type of control components, (6) basic control system, (7) automatic control systems, and (8)…
Urban Planning and Management Information Systems Analysis and Design Based on GIS
NASA Astrophysics Data System (ADS)
Xin, Wang
Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.
Game theory and risk-based leveed river system planning with noncooperation
NASA Astrophysics Data System (ADS)
Hui, Rui; Lund, Jay R.; Madani, Kaveh
2016-01-01
Optimal risk-based levee designs are usually developed for economic efficiency. However, in river systems with multiple levees, the planning and maintenance of different levees are controlled by different agencies or groups. For example, along many rivers, levees on opposite riverbanks constitute a simple leveed river system with each levee designed and controlled separately. Collaborative planning of the two levees can be economically optimal for the whole system. Independent and self-interested landholders on opposite riversides often are willing to separately determine their individual optimal levee plans, resulting in a less efficient leveed river system from an overall society-wide perspective (the tragedy of commons). We apply game theory to simple leveed river system planning where landholders on each riverside independently determine their optimal risk-based levee plans. Outcomes from noncooperative games are analyzed and compared with the overall economically optimal outcome, which minimizes net flood cost system-wide. The system-wide economically optimal solution generally transfers residual flood risk to the lower-valued side of the river, but is often impractical without compensating for flood risk transfer to improve outcomes for all individuals involved. Such compensation can be determined and implemented with landholders' agreements on collaboration to develop an economically optimal plan. By examining iterative multiple-shot noncooperative games with reversible and irreversible decisions, the costs of myopia for the future in making levee planning decisions show the significance of considering the externalities and evolution path of dynamic water resource problems to improve decision-making.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tiwari, P; Chen, Y; Hong, L
2015-06-15
Purpose We developed an automated treatment planning system based on a hierarchical goal programming approach. To demonstrate the feasibility of our method, we report the comparison of prostate treatment plans produced from the automated treatment planning system with those produced by a commercial treatment planning system. Methods In our approach, we prioritized the goals of the optimization, and solved one goal at a time. The purpose of prioritization is to ensure that higher priority dose-volume planning goals are not sacrificed to improve lower priority goals. The algorithm has four steps. The first step optimizes dose to the target structures, whilemore » sparing key sensitive organs from radiation. In the second step, the algorithm finds the best beamlet weight to reduce toxicity risks to normal tissue while holding the objective function achieved in the first step as a constraint, with a small amount of allowed slip. Likewise, the third and fourth steps introduce lower priority normal tissue goals and beam smoothing. We compared with prostate treatment plans from Memorial Sloan Kettering Cancer Center developed using Eclipse, with a prescription dose of 72 Gy. A combination of liear, quadratic, and gEUD objective functions were used with a modified open source solver code (IPOPT). Results Initial plan results on 3 different cases show that the automated planning system is capable of competing or improving on expert-driven eclipse plans. Compared to the Eclipse planning system, the automated system produced up to 26% less mean dose to rectum and 24% less mean dose to bladder while having the same D95 (after matching) to the target. Conclusion We have demonstrated that Pareto optimal treatment plans can be generated automatically without a trial-and-error process. The solver finds an optimal plan for the given patient, as opposed to database-driven approaches that set parameters based on geometry and population modeling.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Streamlining and Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent...
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.
SDDOT transportation systems management & operations program plan.
DOT National Transportation Integrated Search
2016-06-01
The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...
DOT National Transportation Integrated Search
2000-01-01
The purpose of the Florida Rail System Plan is two-fold. First, it represents the rail : component of the Florida Transportation Plan (Agency Functional Plan) which, through an : annual series of policies, programs and projects, implements the Transp...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 2407.102 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 2407.102 Policy. The Senior... Department's Advance Procurement Planning System (APPS). The APPS should generally meet the criteria...
Workshop proceedings: Information Systems for Space Astrophysics in the 21st Century, volume 1
NASA Technical Reports Server (NTRS)
Cutts, James (Editor); Ng, Edward (Editor)
1991-01-01
The Astrophysical Information Systems Workshop was one of the three Integrated Technology Planning workshops. Its objectives were to develop an understanding of future mission requirements for information systems, the potential role of technology in meeting these requirements, and the areas in which NASA investment might have the greatest impact. Workshop participants were briefed on the astrophysical mission set with an emphasis on those missions that drive information systems technology, the existing NASA space-science operations infrastructure, and the ongoing and planned NASA information systems technology programs. Program plans and recommendations were prepared in five technical areas: Mission Planning and Operations; Space-Borne Data Processing; Space-to-Earth Communications; Science Data Systems; and Data Analysis, Integration, and Visualization.
Using TELOS for the planning of the information system audit
NASA Astrophysics Data System (ADS)
Drljaca, D. P.; Latinovic, B.
2018-01-01
This paper intent is to analyse different aspects of information system audit and to synthesise them into the feasibility study report in order to facilitate decision making and planning of information system audit process. The TELOS methodology provides a comprehensive and holistic review for making feasibility study in general. This paper examines the use of TELOS in the identification of possible factors that may influence the decision on implementing information system audit. The research question relates to TELOS provision of sufficient information to decision makers to plan an information system audit. It was found that the TELOS methodology can be successfully applied in the process of approving and planning of information system audit. The five aspects of the feasibility study, if performed objectively, can provide sufficient information to decision makers to commission an information system audit, and also contribute better planning of the audit. Using TELOS methodology can assure evidence-based and cost-effective decision-making process and facilitate planning of the audit. The paper proposes an original approach, not examined until now. It is usual to use TELOS for different purposes and when there is a need for conveying of the feasibility study, but not in the planning of the information system audit. This gives originality to the paper and opens further research questions about evaluation of the feasibility study and possible research on comparative and complementary methodologies.
Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E
2016-11-01
Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.
ERIC Educational Resources Information Center
Stang, David
A staff-needs planning system was developed and tested in a Department of Social Services' Family and Children's Services Unit in a medium-sized county where caseworkers used no established strategy or planning method to facilitate accomplishment of all the job requirements. The goal of the study was to implement a planning system based on each…
Mission Data System Java Edition Version 7
NASA Technical Reports Server (NTRS)
Reinholtz, William K.; Wagner, David A.
2013-01-01
The Mission Data System framework defines closed-loop control system abstractions from State Analysis including interfaces for state variables, goals, estimators, and controllers that can be adapted to implement a goal-oriented control system. The framework further provides an execution environment that includes a goal scheduler, execution engine, and fault monitor that support the expression of goal network activity plans. Using these frameworks, adapters can build a goal-oriented control system where activity coordination is verified before execution begins (plan time), and continually during execution. Plan failures including violations of safety constraints expressed in the plan can be handled through automatic re-planning. This version optimizes a number of key interfaces and features to minimize dependencies, performance overhead, and improve reliability. Fault diagnosis and real-time projection capabilities are incorporated. This version enhances earlier versions primarily through optimizations and quality improvements that raise the technology readiness level. Goals explicitly constrain system states over explicit time intervals to eliminate ambiguity about intent, as compared to command-oriented control that only implies persistent intent until another command is sent. A goal network scheduling and verification process ensures that all goals in the plan are achievable before starting execution. Goal failures at runtime can be detected (including predicted failures) and handled by adapted response logic. Responses can include plan repairs (try an alternate tactic to achieve the same goal), goal shedding, ignoring the fault, cancelling the plan, or safing the system.
Consideration of environmental noise effects in transportation planning by governmental entities
NASA Technical Reports Server (NTRS)
Mayo, L. H.
1975-01-01
Environmental concerns are reviewed with respect to major transportation systems: the interstate highway system and commercial air transportation. The type of planning that was done for interstate highway systems is described, and the shift in social value emphasis that has become apparent since the interstate system was authorized is considered. Other topics discussed include the constitutional framework for the allocation of governmental power with respect to transportation systems planning, governmental assessment of the aircraft noise problem, and evaluating the social benefit of noise abatement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING ACQUISITION PLANNING Acquisition Plans 1407.102 Policy. DOI has implemented its acquisition planning system in 404 DM. This system meets the criteria prescribed in FAR Subpart 7.1, 375 DM, OCIO Program Management, and 376 DM, Automated Data Processing. Each of these addresses strategic planning for...
7 CFR 12.23 - Conservation plans and conservation systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... in the field office technical guide are designed to achieve substantial reductions in soil erosion..., 1985, the measurement of erosion reduction achieved by applying a conservation plan or system shall be... in paragraph (b) which the conservation system or plan was designed to achieve. It is the...
Management Information System Based on the Balanced Scorecard
ERIC Educational Resources Information Center
Kettunen, Juha; Kantola, Ismo
2005-01-01
Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Fluid Power and Control Systems § 58.30-40 Plans. (a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is...
Grid Integration Studies: Advancing Clean Energy Planning and Deployment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katz, Jessica; Chernyakhovskiy, Ilya
2016-07-01
Integrating significant variable renewable energy (VRE) into the grid requires an evolution in power system planning and operation. To plan for this evolution, power system stakeholders can undertake grid integration studies. This Greening the Grid document reviews grid integration studies, common elements, questions, and guidance for system planners.
Model Special Education Manpower Information and Management System. Final Report.
ERIC Educational Resources Information Center
Gilles, Cynthia
The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-line wiring diagram of the power system, supported, by cable lists, panelboard summaries, and other... computed operating loads for each condition of operation. (c) Elementary and isometric or deck wiring plans...) Manual alarm system; and (11) Supervised patrol system. (d) Deck wiring or schematic plans of power...
48 CFR 217.7405 - Plans and reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Plans and reports. 217.7405 Section 217.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Undefinitized Contract Actions 217.7405 Plans and reports. (a)...
48 CFR 217.7405 - Plans and reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Plans and reports. 217.7405 Section 217.7405 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Undefinitized Contract Actions 217.7405 Plans and reports. (a)...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Fluid Power and Control Systems § 58.30-40 Plans. (a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Fluid Power and Control Systems § 58.30-40 Plans. (a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Fluid Power and Control Systems § 58.30-40 Plans. (a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is...
Ebert, M A; Blight, J; Price, S; Haworth, A; Hamilton, C; Cornes, D; Joseph, D J
2004-09-01
Digital data from 3-D treatment planning computers is generally used for patient planning and then never considered again. However, such data contains enormous quantities of information regarding patient geometries, tissue outlining, treatment approaches and dose distributions. Were such data accessible from planning systems from multiple manufacturers, there would be substantial opportunities for undertaking quality assurance of radiotherapy clinical trials, prospective assessment of trial outcomes and basic treatment planning research and development. The technicalities of data exchange between planning systems are outlined, and previous attempts at producing systems capable of viewing and/or manipulating imaging and radiotherapy digital data reviewed. Development of a software system for enhancing the quality of Australasian clinical trials is proposed.
Automated planning for intelligent machines in energy-related applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; de Saussure, G.; Barhen, J.
1984-01-01
This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.
The health systems agency: a new bureaucracy.
Meredith, S; Meredith, G
1977-07-01
A Federal law signed by President Ford in 1975 (PL 93-641) mandates the establishment of Health Systems Agencies across the country. The major intent of the law is to provide local direction and control of health care planning. Each Agency shall have a professional staff under the aegis of a board of directors composed of a majority of consumers and a minority of providers. Data identifying health care needs shall be translated into a Health Systems Plan, which is a statement of goals for each Agency; an Annual Implementation Plan shall be developed as a statement of objectives, projects, and strategies requisite to achieving the Health Systems Plan. The concept of the Health Systems Agency has correlate state and federal bureaucratic strata to facilitate health care planning coordination.
NASA Astrophysics Data System (ADS)
Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie
2008-10-01
During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.
2016 System Summary of University Work Plans. Revised
ERIC Educational Resources Information Center
Board of Governors, State University System of Florida, 2016
2016-01-01
The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' 2025 System Strategic Plan is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is progressing…
NASA Astrophysics Data System (ADS)
Demyanova, O. V.; Andreeva, E. V.; Sibgatullina, D. R.; Kireeva-Karimova, A. M.; Gafurova, A. Y.; Zakirova, Ch S.
2018-05-01
ERP in a modern enterprise information system allowed optimizing internal business processes, reducing production costs and increasing the attractiveness of enterprises for investors. It is an important component of success in the competition and an important condition for attracting investments in the key sector of the state. A vivid example of these systems are enterprise information systems using the methodology of ERP (Enterprise Resource Planning - enterprise resource planning). ERP is an integrated set of methods, processes, technologies and tools. It is based on: supply chain management; advanced planning and scheduling; sales automation; tool responsible for configuring; final resource planning; intelligence business; OLAP technology; block e- Commerce; management of product data. The main purpose of ERP systems is the automation of interrelated processes of planning, accounting and management in key areas of the company. ERP systems are automated systems that effectively address complex problems, including optimal allocation of business resources, ensuring quick and efficient delivery of goods and services to the consumer. Knowledge embedded in ERP systems provided enterprise-wide automation to introduce the activities of all functional departments of the company as a single complex system. At the level of quality estimates, most managers understand that the implementations of ERP systems is a necessary and useful procedure. Assessment of the effectiveness of the information systems implementation is relevant.
Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth
2018-01-01
The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544
DOT National Transportation Integrated Search
1974-02-01
The volume presents the plans for implementing the Satellite-Based Advanced Air Traffic Management System (SAATMS) described in Volumes II, III, and IV. Two plans are presented: an RDT&E plan and a transition plan. The RDT&E plan is presented as a se...
Concurrent planning and execution for a walking robot
NASA Astrophysics Data System (ADS)
Simmons, Reid
1990-07-01
The Planetary Rover project is developing the Ambler, a novel legged robot, and an autonomous software system for walking the Ambler over rough terrain. As part of the project, we have developed a system that integrates perception, planning, and real-time control to navigate a single leg of the robot through complex obstacle courses. The system is integrated using the Task Control Architecture (TCA), a general-purpose set of utilities for building and controlling distributed mobile robot systems. The walking system, as originally implemented, utilized a sequential sense-plan-act control cycle. This report describes efforts to improve the performance of the system by concurrently planning and executing steps. Concurrency was achieved by modifying the existing sequential system to utilize TCA features such as resource management, monitors, temporal constraints, and hierarchical task trees. Performance was increased in excess of 30 percent with only a relatively modest effort to convert and test the system. The results lend support to the utility of using TCA to develop complex mobile robot systems.
A Comparison of Declarative and Hybrid Declarative-Procedural Models for Rover Operations
NASA Technical Reports Server (NTRS)
Knight, Russell; Rabideau, Gregg; Lenda, Matthew; Maldague, Pierre
2012-01-01
The MAPGEN [2] (Mixed-initiative Activity Plan GENerator) planning system is a great example of a hybrid procedural/declarative system where the advantages of each are leveraged to produce an effective planner/scheduler for Mars Exploration Rover tactical planning. We explore the adaptation of the same domain to an entirely declarative planning system (ASPEN [4] Activity Scheduling and Planning ENvironment), and demonstrate that, with some translation, much of the procedural knowledge encoding is amenable to a declarative knowledge encoding.
Kester, Lucy; Stoller, James K
2013-05-01
Use of respiratory therapist (RT)-guided protocols enhances allocation of respiratory care. In the context that optimal protocol use requires a system for auditing respiratory care plans to assure adherence to protocols and expertise of the RTs generating the care plan, a live audit system has been in longstanding use in our Respiratory Therapy Consult Service. Growth in the number of RT positions and the need to audit more frequently has prompted development of a new, computer-aided audit system. The number and results of audits using the old and new systems were compared (for the periods May 30, 2009 through May 30, 2011 and January 1, 2012 through May 30, 2012, respectively). In contrast to the original, live system requiring a patient visit by the auditor, the new system involves completion of a respiratory therapy care plan using patient information in the electronic medical record, both by the RT generating the care plan and the auditor. Completing audits in the new system also uses an electronic respiratory therapy management system. The degrees of concordance between the audited RT's care plans and the "gold standard" care plans using the old and new audit systems were similar. Use of the new system was associated with an almost doubling of the rate of audits (ie, 11 per month vs 6.1 per month). The new, computer-aided audit system increased capacity to audit more RTs performing RT-guided consults while preserving accuracy as an audit tool. Ensuring that RTs adhere to the audit process remains the challenge for the new system, and is the rate-limiting step.
TDRSS momentum unload planning
NASA Technical Reports Server (NTRS)
Cross, George R.; Potter, Mitchell A.; Whitehead, J. Douglass; Smith, James T.
1991-01-01
A knowledge-based system is described which monitors TDRSS telemetry for problems in the momentum unload procedure. The system displays TDRSS telemetry and commands in real time via X-windows. The system constructs a momentum unload plan which agrees with the preferences of the attitude control specialists and the momentum growth characteristics of the individual spacecraft. During the execution of the plan, the system monitors the progress of the procedure and watches for unexpected problems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, S; Zhang, H; Zhang, B
2015-06-15
Purpose: To clinically evaluate the differences in volumetric modulated arc therapy (VMAT) treatment plan and delivery between two commercial treatment planning systems. Methods: Two commercial VMAT treatment planning systems with different VMAT optimization algorithms and delivery approaches were evaluated. This study included 16 clinical VMAT plans performed with the first system: 2 spine, 4 head and neck (HN), 2 brain, 4 pancreas, and 4 pelvis plans. These 16 plans were then re-optimized with the same number of arcs using the second treatment planning system. Planning goals were invariant between the two systems. Gantry speed, dose rate modulation, MLC modulation, planmore » quality, number of monitor units (MUs), VMAT quality assurance (QA) results, and treatment delivery time were compared between the 2 systems. VMAT QA results were performed using Mapcheck2 and analyzed with gamma analysis (3mm/3% and 2mm/2%). Results: Similar plan quality was achieved with each VMAT optimization algorithm, and the difference in delivery time was minimal. Algorithm 1 achieved planning goals by highly modulating the MLC (total distance traveled by leaves (TL) = 193 cm average over control points per plan), while maintaining a relatively constant dose rate (dose-rate change <100 MU/min). Algorithm 2 involved less MLC modulation (TL = 143 cm per plan), but greater dose-rate modulation (range = 0-600 MU/min). The average number of MUs was 20% less for algorithm 2 (ratio of MUs for algorithms 2 and 1 ranged from 0.5-1). VMAT QA results were similar for all disease sites except HN plans. For HN plans, the average gamma passing rates were 88.5% (2mm/2%) and 96.9% (3mm/3%) for algorithm 1 and 97.9% (2mm/2%) and 99.6% (3mm/3%) for algorithm 2. Conclusion: Both VMAT optimization algorithms achieved comparable plan quality; however, fewer MUs were needed and QA results were more robust for Algorithm 2, which more highly modulated dose rate.« less
NASA Technical Reports Server (NTRS)
Davis, Randal; Thalman, Nancy
1993-01-01
The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.
Kosterhon, Michael; Gutenberg, Angelika; Kantelhardt, Sven R; Conrad, Jens; Nimer Amr, Amr; Gawehn, Joachim; Giese, Alf
2017-08-01
A feasibility study. To develop a method based on the DICOM standard which transfers complex 3-dimensional (3D) trajectories and objects from external planning software to any navigation system for planning and intraoperative guidance of complex spinal procedures. There have been many reports about navigation systems with embedded planning solutions but only few on how to transfer planning data generated in external software. Patients computerized tomography and/or magnetic resonance volume data sets of the affected spinal segments were imported to Amira software, reconstructed to 3D images and fused with magnetic resonance data for soft-tissue visualization, resulting in a virtual patient model. Objects needed for surgical plans or surgical procedures such as trajectories, implants or surgical instruments were either digitally constructed or computerized tomography scanned and virtually positioned within the 3D model as required. As crucial step of this method these objects were fused with the patient's original diagnostic image data, resulting in a single DICOM sequence, containing all preplanned information necessary for the operation. By this step it was possible to import complex surgical plans into any navigation system. We applied this method not only to intraoperatively adjustable implants and objects under experimental settings, but also planned and successfully performed surgical procedures, such as the percutaneous lateral approach to the lumbar spine following preplanned trajectories and a thoracic tumor resection including intervertebral body replacement using an optical navigation system. To demonstrate the versatility and compatibility of the method with an entirely different navigation system, virtually preplanned lumbar transpedicular screw placement was performed with a robotic guidance system. The presented method not only allows virtual planning of complex surgical procedures, but to export objects and surgical plans to any navigation or guidance system able to read DICOM data sets, expanding the possibilities of embedded planning software.
Olsson, Pontus; Nysjö, Fredrik; Hirsch, Jan-Michaél; Carlbom, Ingrid B
2013-11-01
Cranio-maxillofacial (CMF) surgery to restore normal skeletal anatomy in patients with serious trauma to the face can be both complex and time-consuming. But it is generally accepted that careful pre-operative planning leads to a better outcome with a higher degree of function and reduced morbidity in addition to reduced time in the operating room. However, today's surgery planning systems are primitive, relying mostly on the user's ability to plan complex tasks with a two-dimensional graphical interface. A system for planning the restoration of skeletal anatomy in facial trauma patients using a virtual model derived from patient-specific CT data. The system combines stereo visualization with six degrees-of-freedom, high-fidelity haptic feedback that enables analysis, planning, and preoperative testing of alternative solutions for restoring bone fragments to their proper positions. The stereo display provides accurate visual spatial perception, and the haptics system provides intuitive haptic feedback when bone fragments are in contact as well as six degrees-of-freedom attraction forces for precise bone fragment alignment. A senior surgeon without prior experience of the system received 45 min of system training. Following the training session, he completed a virtual reconstruction in 22 min of a complex mandibular fracture with an adequately reduced result. Preliminary testing with one surgeon indicates that our surgery planning system, which combines stereo visualization with sophisticated haptics, has the potential to become a powerful tool for CMF surgery planning. With little training, it allows a surgeon to complete a complex plan in a short amount of time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zaks, D; Fletcher, R; Salamon, S
Purpose: To develop an online framework that tracks a patient’s plan from initial simulation to treatment and that helps automate elements of the physics plan checks usually performed in the record and verify (RV) system and treatment planning system. Methods: We have developed PlanTracker, an online plan tracking system that automatically imports new patients tasks and follows it through treatment planning, physics checks, therapy check, and chart rounds. A survey was designed to collect information about the amount of time spent by medical physicists in non-physics related tasks. We then assessed these non-physics tasks for automation. Using these surveys, wemore » directed our PlanTracker software development towards the automation of intra-plan physics review. We then conducted a systematic evaluation of PlanTracker’s accuracy by generating test plans in the RV system software designed to mimic real plans, in order to test its efficacy in catching errors both real and theoretical. Results: PlanTracker has proven to be an effective improvement to the clinical workflow in a radiotherapy clinic. We present data indicating that roughly 1/3 of the physics plan check can be automated, and the workflow optimized, and show the functionality of PlanTracker. When the full system is in clinical use we will present data on improvement of time use in comparison to survey data prior to PlanTracker implementation. Conclusion: We have developed a framework for plan tracking and automatic checks in radiation therapy. We anticipate using PlanTracker as a basis for further development in clinical/research software. We hope that by eliminating the most simple and time consuming checks, medical physicists may be able to spend their time on plan quality and other physics tasks rather than in arithmetic and logic checks. We see this development as part of a broader initiative to advance the clinical/research informatics infrastructure surrounding the radiotherapy clinic. This research project has been financially supported by Varian Medical Systems, Palo Alto, CA, through a Varian MRA.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walters, C.H.; Lomax, T.J.; Poe, C.M.
1995-07-01
The Dallas Freeway/High-Occupany Vehicle Lane System Planning Study is a joint project in cooperation with the Texas Department of Transportation (TxDOT), Dallas Area Rapid Transit (DART), the North Central Texas Council of Governments (NCTCOG), and the Texas Transportation Institute (TTI). The intent of this effort is to assist in the development of an area-wide freeway/HOV system that recognizes implementation constraints (right-of-way and construction costs) and provides reasonable peak-hour operating conditions on all freeway facilities, while incorporating the long-range plans developed by TxDOT, DART, and NCTCOG. The proposed system is a set of recommendations to be considered and evaluated as partmore » of the development of the NCTCOG Mobility 2010 Plan Update, the long-range transportation plan for the Dallas area. HOV facilities are a significant part of the recommended system in the Dallas System Planning Study, and their implementation is important to the successful operation of the Dallas area transportation system in the future. The report, therefore, focuses on the recommended HOV improvements from the methodology.« less
5 CFR 930.301 - Information systems security awareness training program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...
DOT National Transportation Integrated Search
2000-02-01
The 1992 Oregon Transportation Plan created policies and investment strategies for Oregon's multimodal transportation system. The statewide plan called for a transportation system marked by modal balance, efficiency, accessibility, environmental resp...
2017-01-01
UNMANNED AERIAL SYSTEMS Air Force and Army Should Improve Strategic Human Capital Planning for Pilot Workforces...Should Improve Strategic Human Capital Planning for Pilot Workforces What GAO Found The Air Force and the Army have not fully applied four of the five...key principles for effective strategic human capital planning for managing pilots of unmanned aerial systems (UAS) that are important for resolving
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Policy. 7.102 Section 7.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.102 Policy. (a) Agencies shall perform acquisition planning and...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 7.102 Section 7.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 7.102 Policy. (a) Agencies shall perform acquisition planning and...
48 CFR 47.202 - Presolicitation planning.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Presolicitation planning. 47.202 Section 47.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT... Presolicitation planning. Contracting officers shall inform activities that plan to acquire transportation or...
Intelligent Planning and Scheduling for Controlled Life Support Systems
NASA Technical Reports Server (NTRS)
Leon, V. Jorge
1996-01-01
Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.
Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration
NASA Technical Reports Server (NTRS)
Fox, Jason M.; Norris, Jeffrey S.; Powell, Mark W.; Rabe, Kenneth J.; Shams, Khawaja
2006-01-01
A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
48 CFR 1602.170-3 - Comprehensive medical plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Comprehensive medical plan. 1602.170-3 Section 1602.170-3 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Definitions of FEHBP Terms 1602.170-3 Comprehensive medical plan. Comprehensive Medical Plan means a plan as...
Mission activities planning for a Hermes mission by means of AI-technology
NASA Technical Reports Server (NTRS)
Pape, U.; Hajen, G.; Schielow, N.; Mitschdoerfer, P.; Allard, F.
1993-01-01
Mission Activities Planning is a complex task to be performed by mission control centers. AI technology can offer attractive solutions to the planning problem. This paper presents the use of a new AI-based Mission Planning System for crew activity planning. Based on a HERMES servicing mission to the COLUMBUS Man Tended Free Flyer (MTFF) with complex time and resource constraints, approximately 2000 activities with 50 different resources have been generated, processed, and planned with parametric variation of operationally sensitive parameters. The architecture, as well as the performance of the mission planning system, is discussed. An outlook to future planning scenarios, the requirements, and how a system like MARS can fulfill those requirements is given.
Architecture for spacecraft operations planning
NASA Technical Reports Server (NTRS)
Davis, William S.
1991-01-01
A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
78 FR 46929 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-02
..., Continuity of Operations Plans, in its existing inventory of record systems subject to the Privacy Act of... incorporate the Continuity of Operations Office plans from agency field offices. DATES: This proposed action... of Defense. KD3D.01 System name: Continuity of Operations Plans (August 22, 2000, 65 FR 50974...
At the Ready: Planning for Business Continuity
ERIC Educational Resources Information Center
Sharp, Linda
2011-01-01
School system leaders never know when disaster may strike. Having a plan in place to protect vital data and systems is crucial. School system leaders need to be actively involved in crisis preparedness, planned response, and recovery to ensure student and staff safety and to make certain that all important operations, services, processes, and…
Long Range Plan for Information Systems from the State Board of Education.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
The Information Systems Long Range Plan specifically addresses Goal four of the Texas State Board of Education's (SBOE's) "Long-Range Plan for Public School Education" dealing with efficient management and organization of the educational system. To facilitate this goal, the SBOE in 1986 approved and directed the Texas Education Agency to…
40 CFR 60.752 - Standards for air emissions from municipal solid waste landfills.
Code of Federal Regulations, 2010 CFR
2010-07-01
... collection and control system design plan prepared by a professional engineer to the Administrator within 1 year: (A) The collection and control system as described in the plan shall meet the design requirements of paragraph (b)(2)(ii) of this section. (B) The collection and control system design plan shall...
40 CFR 60.752 - Standards for air emissions from municipal solid waste landfills.
Code of Federal Regulations, 2013 CFR
2013-07-01
... collection and control system design plan prepared by a professional engineer to the Administrator within 1 year: (A) The collection and control system as described in the plan shall meet the design requirements of paragraph (b)(2)(ii) of this section. (B) The collection and control system design plan shall...
40 CFR 60.752 - Standards for air emissions from municipal solid waste landfills.
Code of Federal Regulations, 2014 CFR
2014-07-01
... collection and control system design plan prepared by a professional engineer to the Administrator within 1 year: (A) The collection and control system as described in the plan shall meet the design requirements of paragraph (b)(2)(ii) of this section. (B) The collection and control system design plan shall...
40 CFR 60.752 - Standards for air emissions from municipal solid waste landfills.
Code of Federal Regulations, 2012 CFR
2012-07-01
... collection and control system design plan prepared by a professional engineer to the Administrator within 1 year: (A) The collection and control system as described in the plan shall meet the design requirements of paragraph (b)(2)(ii) of this section. (B) The collection and control system design plan shall...
40 CFR 60.752 - Standards for air emissions from municipal solid waste landfills.
Code of Federal Regulations, 2011 CFR
2011-07-01
... collection and control system design plan prepared by a professional engineer to the Administrator within 1 year: (A) The collection and control system as described in the plan shall meet the design requirements of paragraph (b)(2)(ii) of this section. (B) The collection and control system design plan shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-07
...] Petition for Positive Train Control Safety Plan Approval and System Certification of the Electronic Train... the Federal Railroad Administration (FRA) for Positive Train Control (PTC) Safety Plan (PTCSP...-based train control system safety overlay designed to protect against the consequences of train-to-train...
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Establishing an Environmental Scanning System to Augment College and University Planning.
ERIC Educational Resources Information Center
Morrison, James L.
A plan to establish an environmental scanning and forecasting system for colleges and universities is discussed as a way to maximize long-range planning. After proposing a program structure, attention is directed to methods of gaining organizational acceptance, developing a comprehensive taxonomy with an electronic filing system, identifying and…
48 CFR 243.204-70-7 - Plans and reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Plans and reports. 243.204-70-7 Section 243.204-70-7 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced...
48 CFR 243.204-70-7 - Plans and reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Plans and reports. 243.204-70-7 Section 243.204-70-7 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.204-70-7 Plans and reports. To provide for enhanced...
Succession Planning in a Two-Year Technical College System
ERIC Educational Resources Information Center
Neefe, Diane Osterhaus
2009-01-01
The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…
The State University System 2025 System Strategic Plan. Revised
ERIC Educational Resources Information Center
Board of Governors, State University System of Florida, 2014
2014-01-01
The State University System 2025 Strategic Plan strengthens the Board of Governors' commitment to achieving excellence in the tripartite mission of its state universities--teaching, research, and public service--for the benefit of Florida's citizens, their communities, and the state economy. The Strategic Plan is a living document that helps align…
Planning and design of a knowledge based system for green manufacturing management
NASA Astrophysics Data System (ADS)
Kamal Mohd Nawawi, Mohd; Mohd Zuki Nik Mohamed, Nik; Shariff Adli Aminuddin, Adam
2013-12-01
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization.
Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCDANIEL, K.S.
1999-08-31
Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.
DOT National Transportation Integrated Search
1997-07-01
This report describes the work of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study is to define the market, organization, and resource requirements for a national program...
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202... plans and the underlying management control systems, and it should formulate a plan to handle these...
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202... plans and the underlying management control systems, and it should formulate a plan to handle these...
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202... plans and the underlying management control systems, and it should formulate a plan to handle these...
ERIC Educational Resources Information Center
Hunt, Lester W.; Burr, Donald F.
The Simu-School Program and the National Center for Educational Planning were conceived because of the need for (1) expertise in educational planning, (2) a system to collect and assemble the vast amount of knowledge concerning education, (3) community involvement in planning, and (4) a system to accurately interpret today's data in planning for…
Linking human and natural systems in the planning process
Susan I. Stewart; Miranda H. Mockrin; Roger B. Hammer
2012-01-01
Planning links human and natural systems in the urban-rural interface by engaging people in consideration of the future of natural resources. We review evolving ideas about what planning entails, who it involves, and what its outcomes should be. Sense of place, collaboration, emergent planning, and other new developments in planning are discussed. Smaller plans,...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gökçe, M., E-mail: mgokce@adu.edu.tr; Uslu, D. Koçyiğit; Ertunç, C.
The aim of this study is to compare Intensity Modulated Radiation Therapy (IMRT) plan of prostate cancer patients with different dose verification systems in dosimetric aspects and to compare these systems with each other in terms of reliability, applicability and application time. Dosimetric control processes of IMRT plan of three prostate cancer patients were carried out using thermoluminescent dosimeter (TLD), ion chamber (IC) and 2D Array detector systems. The difference between the dose values obtained from the dosimetric systems and treatment planning system (TPS) were found to be about % 5. For the measured (TLD) and calculated (TPS) doses %3more » percentage differences were obtained for the points close to center while percentage differences increased at the field edges. It was found that TLD and IC measurements will increase the precision and reliability of the results of 2D Array.« less
Vehicle management and mission planning systems with shuttle applications
NASA Technical Reports Server (NTRS)
1972-01-01
A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.
Murphy, Gail Tomblin; Birch, Stephen; MacKenzie, Adrian; Rigby, Janet; Purkis, Mary Ellen
2017-01-01
Clarifying the healthcare innovation agenda is critical in order to advance the impact of system innovations. As part of this agenda-setting it is important to address the four conditions within which innovations can enhance system sustainability: 1) the innovation agenda reflects and is aligned with healthcare objectives and policy; 2) planning methodologies for services, workforce and funding are aligned with healthcare objectives and policy; 3) innovations in services are accommodated in systems through innovations in policy, planning and funding; and 4) innovations are systematically monitored and evaluated. In order to illustrate these conditions, the authors present a case study of an evaluation of one Canadian Health Authority's efforts to transform healthcare delivery. This case study reveals that aligning innovations in policy, planning, funding and health services is critical to transforming health systems and that, in the absence of such alignment, sustainable health systems are difficult to achieve.
NASA Technical Reports Server (NTRS)
Azarbar, Bahman
1990-01-01
Existing and actively planned mobile satellite systems are competing for a viable share of the spectrum allocated by the International Telecommunications Union (ITU) to the satellite based mobile services in the 1.5/1.6 GHz range. The limited amount of spectrum available worldwide and the sheer number of existing and planned mobile satellite systems dictate the adoption of an architecture which will maximize sharing possibilities. A viable sharing architecture must recognize the operational needs and limitations of the existing systems. Furthermore, recognizing the right of access of the future systems as they will emerge in time, the adopted architecture must allow for additional growth and be amenable to orderly introduction of future systems. An attempt to devise such a sharing architecture is described. A specific example of the application of the basic concept to the existing and planned mobile satellite systems is also discussed.
Review of the FAA 1982 National Airspace System plan
DOT National Transportation Integrated Search
1982-08-01
The National Airspace (NAS) Plan outlines the Federal Aviation Administration's most recent proposals for modernizing the facilities and equipment that make up the air traffic control (ATC) system. This review of the NAS Plan examines the Plan at two...
Intelligent transportation systems business plan for Kentucky : final report.
DOT National Transportation Integrated Search
2001-09-01
This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...
Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan
NASA Technical Reports Server (NTRS)
1973-01-01
The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.
NASA Technical Reports Server (NTRS)
1975-01-01
Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.
2013-07-18
Department of the Navy ERP Enterprise Resource Planning FMO Office of Financial Operations NAVAIR Naval Air Systems Command NAVSEA Naval...supported by business processes in the Navy Enterprise Resource Planning ( ERP ) system for the Aircraft, Shipbuilding, and Weapons Procurement...appropriations. What We Found Department of the Navy Office of Financial Operations officials did not use the Navy ERP system to support $416 billion in
Execution monitoring for a mobile robot system
NASA Technical Reports Server (NTRS)
Miller, David P.
1990-01-01
Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.
Zuckerman, Stephen; Skopec, Laura; Guterman, Stuart
2017-12-01
Medicare Advantage (MA), the program that allows people to receive their Medicare benefits through private health plans, uses a benchmark-and-bidding system to induce plans to provide benefits at lower costs. However, prior research suggests medical costs, profits, and other plan costs are not as low under this system as they might otherwise be. To examine how well the current system encourages MA plans to bid their lowest cost by examining the relationship between costs and bonuses (rebates) and the benchmarks Medicare uses in determining plan payments. Regression analysis using 2015 data for HMO and local PPO plans. Costs and rebates are higher for MA plans in areas with higher benchmarks, and plan costs vary less than benchmarks do. A one-dollar increase in benchmarks is associated with 32-cent-higher plan costs and a 52-cent-higher rebate, even when controlling for market and plan factors that can affect costs. This suggests the current benchmark-and-bidding system allows plans to bid higher than local input prices and other market conditions would seem to warrant. To incentivize MA plans to maximize efficiency and minimize costs, Medicare could change the way benchmarks are set or used.
A user interface for a knowledge-based planning and scheduling system
NASA Technical Reports Server (NTRS)
Mulvehill, Alice M.
1988-01-01
The objective of EMPRESS (Expert Mission Planning and Replanning Scheduling System) is to support the planning and scheduling required to prepare science and application payloads for flight aboard the US Space Shuttle. EMPRESS was designed and implemented in Zetalisp on a 3600 series Symbolics Lisp machine. Initially, EMPRESS was built as a concept demonstration system. The system has since been modified and expanded to ensure that the data have integrity. Issues underlying the design and development of the EMPRESS-I interface, results from a system usability assessment, and consequent modifications are described.
Automatic Scheduling and Planning (ASAP) in future ground control systems
NASA Technical Reports Server (NTRS)
Matlin, Sam
1988-01-01
This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wooten, H. Omar, E-mail: hwooten@radonc.wustl.edu; Green, Olga; Yang, Min
2015-07-15
Purpose: This work describes a commercial treatment planning system, its technical features, and its capabilities for creating {sup 60}Co intensity modulated radiation therapy (IMRT) treatment plans for a magnetic resonance image guidance radiation therapy (MR-IGRT) system. Methods and Materials: The ViewRay treatment planning system (Oakwood Village, OH) was used to create {sup 60}Co IMRT treatment plans for 33 cancer patients with disease in the abdominal, pelvic, thorax, and head and neck regions using physician-specified patient-specific target coverage and organ at risk (OAR) objectives. Backup plans using a third-party linear accelerator (linac)-based planning system were also created. Plans were evaluated bymore » attending physicians and approved for treatment. The {sup 60}Co and linac plans were compared by evaluating conformity numbers (CN) with 100% and 95% of prescription reference doses and heterogeneity indices (HI) for planning target volumes (PTVs) and maximum, mean, and dose-volume histogram (DVH) values for OARs. Results: All {sup 60}Co IMRT plans achieved PTV coverage and OAR sparing that were similar to linac plans. PTV conformity for {sup 60}Co was within <1% and 3% of linac plans for 100% and 95% prescription reference isodoses, respectively, and heterogeneity was on average 4% greater. Comparisons of OAR mean dose showed generally better sparing with linac plans in the low-dose range <20 Gy, but comparable sparing for organs with mean doses >20 Gy. The mean doses for all {sup 60}Co plan OARs were within clinical tolerances. Conclusions: A commercial {sup 60}Co MR-IGRT device can produce highly conformal IMRT treatment plans similar in quality to linac IMRT for a variety of disease sites. Additional work is in progress to evaluate the clinical benefit of other novel features of this MR-IGRT system.« less
A dynamic case-based planning system for space station application
NASA Technical Reports Server (NTRS)
Oppacher, F.; Deugo, D.
1988-01-01
We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).
DOT National Transportation Integrated Search
1994-01-01
This study focuses on defining HOV systems and their components, criteria, and related issues in a systems planning context (as compared with the conventional project level planning). Definitions are provided to establish the physical and socioeconom...
SU-E-I-97: Smart Auto-Planning Framework in An EMR Environment (SAFEE)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, B; Chen, S; Mutaf, Y
2014-06-01
Purpose: Our Radiation Oncology Department uses clinical practice guidelines for patient treatment, including normal tissue sparing and other dosimetric constraints. These practice guidelines were adapted from national guidelines, clinical trials, literature reviews, and practitioner's own experience. Modern treatment planning systems (TPS) have the capability of incorporating these practice guidelines to automatically create radiation therapy treatment plans with little human intervention. We are developing a software infrastructure to integrate clinical practice guidelines and radiation oncology electronic medical record (EMR) system into radiation therapy treatment planning system (TPS) for auto planning. Methods: Our Smart Auto-Planning Framework in an EMR environment (SAFEE) usesmore » a software pipeline framework to integrate practice guidelines,EMR, and TPS together. The SAFEE system starts with retrieving diagnosis information and physician's prescription from the EMR system. After approval of contouring, SAFEE will automatically create plans according to our guidelines. Based on clinical objectives, SAFEE will automatically select treatment delivery techniques (such as, 3DRT/IMRT/VMAT) and optimize plans. When necessary, SAFEE will create multiple treatment plans with different combinations of parameters. SAFEE's pipeline structure makes it very flexible to integrate various techniques, such as, Model-Base Segmentation (MBS) and plan optimization algorithms, e.g., Multi-Criteria Optimization (MCO). In addition, SAFEE uses machine learning, data mining techniques, and an integrated database to create clinical knowledgebase and then answer clinical questions, such as, how to score plan quality or how volume overlap affects physicians' decision in beam and treatment technique selection. Results: In our institution, we use Varian Aria EMR system and RayStation TPS from RaySearch, whose ScriptService API allows control by external programs. These applications are the building blocks of our SAFEE system. Conclusion: SAFEE is a feasible method of integrating clinical information to develop an auto-planning paradigm to improve clinical workflow in cancer patient care.« less
Mono-stereo-autostereo: the evolution of 3-dimensional neurosurgical planning.
Stadie, Axel T; Kockro, Ralf A
2013-01-01
In the past decade, surgery planning has changed significantly. The main reason is the improvements in computer graphical rendering power and display technology, which turned the plain graphics of the mid-1990s into interactive stereoscopic objects. To report our experiences with 2 virtual reality systems used for planning neurosurgical operations. A series of 208 operations were planned with the Dextroscope (Bracco AMT, Singapore) requiring the use of liquid crystal display shutter glasses. The participating neurosurgeons answered a questionnaire after the planning procedure and postoperatively. In a second prospective series of 33 patients, we used an autostereoscopic monitor system (MD20-3-D; Setred SA, Sweden) to plan intracranial operations. A questionnaire regarding the value of surgery planning was answered preoperatively and postoperatively. The Dextroscope could be integrated into daily surgical routine. Surgeons regarded their understanding of the pathoanatomical situation as improved, leading to enhanced intraoperative orientation and confidence compared with conventional planning. The autostereoscopic Setred system was regarded as helpful in establishing the surgical strategy and analyzing the pathoanatomical situation compared with conventional planning. Both systems were perceived as a backup in case of failure of the standard navigation system. Improvement of display and interaction techniques adds to the realism of the planning process and enables precise structural understanding preoperatively. This minimizes intraoperative guesswork and exploratory dissection. Autostereoscopic display techniques will further increase the value and acceptance of 3-dimensional planning and intraoperative navigation.
NASA Technical Reports Server (NTRS)
Dunbar, J. C.
1972-01-01
The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.
The Challenge of Grounding Planning in Simulation with an Interactive Model Development Environment
NASA Technical Reports Server (NTRS)
Clement, Bradley J.; Frank, Jeremy D.; Chachere, John M.; Smith, Tristan B.; Swanson, Keith J.
2011-01-01
A principal obstacle to fielding automated planning systems is the difficulty of modeling. Physical systems are modeled conventionally based on specification documents and the modeler's understanding of the system. Thus, the model is developed in a way that is disconnected from the system's actual behavior and is vulnerable to manual error. Another obstacle to fielding planners is testing and validation. For a space mission, generated plans must be validated often by translating them into command sequences that are run in a simulation testbed. Testing in this way is complex and onerous because of the large number of possible plans and states of the spacecraft. Though, if used as a source of domain knowledge, the simulator can ease validation. This paper poses a challenge: to ground planning models in the system physics represented by simulation. A proposed, interactive model development environment illustrates the integration of planning and simulation to meet the challenge. This integration reveals research paths for automated model construction and validation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Plans. 58.30-40 Section 58.30-40 Shipping COAST GUARD... SYSTEMS Fluid Power and Control Systems § 58.30-40 Plans. (a) Diagrammatic plans and lists of materials... installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and...
Effectiveness of a Case-Based System in Lesson Planning
ERIC Educational Resources Information Center
Saad, A.; Chung, P. W. H.; Dawson, C. W.
2014-01-01
Lesson planning imposes a significant burden on teachers as they need to prepare different lesson plans for different classes according to various constraints. SmartLP, a case-based lesson planning system, has been implemented as a means of assisting teachers in constructing quality lesson plans more quickly. SmartLP enables teachers to retrieve…
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1992-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Hall, Philip P.
1985-01-01
The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.
DOT National Transportation Integrated Search
2010-04-21
To prepare for future air traffic growth, the Federal Aviation Administration (FAA), including its Joint Planning and Development Office (JPDO) and Air Traffic Organization, is planning and implementing the Next Generation Air Transportation System (...
Career Planning Modules for the Officer Career Information and Planning System.
ERIC Educational Resources Information Center
Phillips, Susan D.; And Others
This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
ERIC Educational Resources Information Center
Maassen, Peter, A. M.; Potman, Henry P.
1990-01-01
The new strategic planning system in Dutch higher education is described and the usefulness of strategic planning in higher education institutions in general is discussed. Three models are distinguished: linear, adaptive, and interpretive. Evidence suggesting the system has resulted in more homogenization than diversification is presented.…
ERIC Educational Resources Information Center
Social and Rehabilitation Service (DHEW), Washington, DC.
The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…
ERIC Educational Resources Information Center
Martin, Christopher J.
2012-01-01
Three decades of research has indicated that strategic information systems planning is a vital component to business success. The purpose of this study was to identify the relationship strategic information systems planning and financial commitment has within the K-12 public education sector. Data for this study was obtained from top management of…
Experimental Packet Radio System Design Plan
1974-03-13
specific design parameters (packet format, data rates, modulation type, spread factor, etc.) for the initial system configuration. c. Prototype...are described along with size, weight and power estimates, and projections of per- formance parameters . d. Measurement and Test. The plan...are presented covering the communications link, system parameters , and various levels of network operation and performance. This plan is a snapshot
Core and Off-Core Processes in Systems Engineering
NASA Technical Reports Server (NTRS)
Breidenthal, Julian; Forsberg, Kevin
2010-01-01
An emerging methodology of organizing systems-engineering plans is based on a concept of core and off-core processes or activities. This concept has emerged as a result of recognition of a risk in the traditional representation of systems-engineering plans by a Vee model alone, according to which a large system is decomposed into levels of smaller subsystems, then integrated through levels of increasing scope until the full system is constructed. Actual systems-engineering activity is more complicated, raising the possibility that the staff will become confused in the absence of plans which explain the nature and ordering of work beyond the traditional Vee model.
Using Sequence Diagrams to Detect Communication Problems Between Systems
NASA Technical Reports Server (NTRS)
Lindvall, Mikael; Ackermann, Chris; Stratton, William C.; Sibol, Deane E.; Ray, Arnab; Yonkwa, Lyly; Kresser, Jan; Godfrey, Sally H.; Knodel, Jens
2008-01-01
Many software systems are evolving complex system of systems (SoS) for which inter-system communication is both mission-critical and error-prone. Such communication problems ideally would be detected before deployment. In a NASA-supported Software Assurance Research Program (SARP) project, we are researching a new approach addressing such problems. In this paper, we show that problems in the communication between two systems can be detected by using sequence diagrams to model the planned communication and by comparing the planned sequence to the actual sequence. We identify different kinds of problems that can be addressed by modeling the planned sequence using different level of abstractions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Masi, K; Ditman, M; Marsh, R
Purpose: There is potentially a wide variation in plan quality for a certain disease site, even for clinics located in the same system of hospitals. We have used a prostate-specific knowledge-based planning (KBP) model as a quality control tool to investigate the variation in prostate treatment planning across a network of affiliated radiation oncology departments. Methods: A previously created KBP model was applied to 10 patients each from 4 community-based clinics (Clinics A, B, C, and D). The KBP model was developed using RapidPlan (Eclipse v13.5, Varian Medical Systems) from 60 prostate/prostate bed IMRT plans that were originally planned usingmore » an in-house treatment planning system at the central institution of the community-based clinics. The dosimetric plan quality (target coverage and normal-tissue sparing) of each model-generated plan was compared to the respective clinically-used plan. Each community-based clinic utilized the same planning goals to develop the clinically-used plans that were used at the main institution. Results: Across all 4 clinics, the model-generated plans decreased the mean dose to the rectum by varying amounts (on average, 12.5, 2.6, 4.5, and 2.7 Gy for Clinics A, B, C, and D, respectively). The mean dose to the bladder also decreased with the model-generated plans (5.4, 2.3, 3.0, and 4.1 Gy, respectively). The KBP model also identified that target coverage (D95%) improvements were possible for for Clinics A, B, and D (0.12, 1.65, and 2.75%) while target coverage decreased by 0.72% for Clinic C, demonstrating potentially different trade-offs made in clinical plans at different institutions. Conclusion: Quality control of dosimetric plan quality across a system of radiation oncology practices is possible with knowledge-based planning. By using a quality KBP model, smaller community-based clinics can potentially identify the areas of their treatment plans that may be improved, whether it be in normal-tissue sparing or improved target coverage. M. Matuszak has research funding for KBP from Varian Medical Systems.« less
Intelligent Transportation Systems Early Deployment Planning for a Small Region
DOT National Transportation Integrated Search
1999-01-01
Strategic planning for intelligent transportation systems (ITS) in : smaller metropolitan areas presents a number of difficulties. Awareness of and : experience with the use of electronics and communications systems among : transportation syst...
Priority System for Multimodal and Intermodal Transportation Planning
DOT National Transportation Integrated Search
1997-01-01
Prioritization is an increasingly important concept for transportation system planning and programming. The resources for capital improvements to state and regional transportation systems are stagnant or declining. At the same time, population growth...
2009 Iowa railroad system plan.
DOT National Transportation Integrated Search
2009-01-01
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail ...
System Summary of University Annual Work Plans, 2014-15
ERIC Educational Resources Information Center
Board of Governors, State University System of Florida, 2014
2014-01-01
The State University System of Florida has developed three tools that aid in guiding the System's future; (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…
The development of a recreational land classification system
Robert W. Reinhardt; Diana Gould
1995-01-01
The New York State Office of Parks, Recreation, and Historic Preservation has had a land classification system in place since 1972. This system was developed during the creation of the first Statewide Comprehensive Outdoor Recreation Plan. This system has become the backbone of the Park Master Planning Process. During the past few years the New York State Park System...
The Impact of Enterprise Resource Planning Systems on Small and Medium Enterprises
ERIC Educational Resources Information Center
Buleje, Miguel A.
2014-01-01
Enterprise resource planning (ERP) systems are considered the price of entry in today's business environment, and the number of small and medium-sized enterprises (SME) retiring legacy systems in favor of ERP systems is increasing exponentially. However, there is a lack of knowledge and awareness of ERP systems and their potential benefit and…
NASA Technical Reports Server (NTRS)
Allen, M. A.; Roman, G. S.
1979-01-01
The specification used to install a broadband coaxial cable communication system to support remote terminal operations on the Crew Activity Planning system at the Lyndon B. Johnson Space Center are reported. The system supports high speed communications between a Harris Slash 8 computer and one or more Sanders Graphic 7 displays.
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
NASA Technical Reports Server (NTRS)
Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte
1992-01-01
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.
IBM PC/IX operating system evaluation plan
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros
1984-01-01
An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
WHITE, D.A.
1999-12-29
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).
Information Systems for University Planning.
ERIC Educational Resources Information Center
Robinson, Robert J.
This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Y; Tan, J; Jiang, S
Purpose: High dose rate (HDR) brachytherapy treatment planning is conventionally performed in a manual fashion. Yet it is highly desirable to perform computerized automated planning to improve treatment planning efficiency, eliminate human errors, and reduce plan quality variation. The goal of this research is to develop an automatic treatment planning tool for HDR brachytherapy with a cylinder applicator for vaginal cancer. Methods: After inserting the cylinder applicator into the patient, a CT scan was acquired and was loaded to an in-house developed treatment planning software. The cylinder applicator was automatically segmented using image-processing techniques. CTV was generated based on user-specifiedmore » treatment depth and length. Locations of relevant points (apex point, prescription point, and vaginal surface point), central applicator channel coordinates, and dwell positions were determined according to their geometric relations with the applicator. Dwell time was computed through an inverse optimization process. The planning information was written into DICOM-RT plan and structure files to transfer the automatically generated plan to a commercial treatment planning system for plan verification and delivery. Results: We have tested the system retrospectively in nine patients treated with vaginal cylinder applicator. These cases were selected with different treatment prescriptions, lengths, depths, and cylinder diameters to represent a large patient population. Our system was able to generate treatment plans for these cases with clinically acceptable quality. Computation time varied from 3–6 min. Conclusion: We have developed a system to perform automated treatment planning for HDR brachytherapy with a cylinder applicator. Such a novel system has greatly improved treatment planning efficiency and reduced plan quality variation. It also served as a testbed to demonstrate the feasibility of automatic HDR treatment planning for more complicated cases.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shwetha, Bondel; Ravikumar, Manickam, E-mail: drravikumarm@gmail.com; Supe, Sanjay S.
2012-04-01
Various treatment planning systems are used to design plans for the treatment of cervical cancer using high-dose-rate brachytherapy. The purpose of this study was to make a dosimetric comparison of the 2 treatment planning systems from Varian medical systems, namely ABACUS and BrachyVision. The dose distribution of Ir-192 source generated with a single dwell position was compared using ABACUS (version 3.1) and BrachyVision (version 6.5) planning systems. Ten patients with intracavitary applications were planned on both systems using orthogonal radiographs. Doses were calculated at the prescription points (point A, right and left) and reference points RU, LU, RM, LM, bladder,more » and rectum. For single dwell position, little difference was observed in the doses to points along the perpendicular bisector. The mean difference between ABACUS and BrachyVision for these points was 1.88%. The mean difference in the dose calculated toward the distal end of the cable by ABACUS and BrachyVision was 3.78%, whereas along the proximal end the difference was 19.82%. For the patient case there was approximately 2% difference between ABACUS and BrachyVision planning for dose to the prescription points. The dose difference for the reference points ranged from 0.4-1.5%. For bladder and rectum, the differences were 5.2% and 13.5%, respectively. The dose difference between the rectum points was statistically significant. There is considerable difference between the dose calculations performed by the 2 treatment planning systems. It is seen that these discrepancies are caused by the differences in the calculation methodology adopted by the 2 systems.« less
TU-D-201-06: HDR Plan Prechecks Using Eclipse Scripting API
DOE Office of Scientific and Technical Information (OSTI.GOV)
Palaniswaamy, G; Morrow, A; Kim, S
Purpose: Automate brachytherapy treatment plan quality check using Eclipse v13.6 scripting API based on pre-configured rules to minimize human error and maximize efficiency. Methods: The HDR Precheck system is developed based on a rules-driven approach using Eclipse scripting API. This system checks for critical plan parameters like channel length, first source position, source step size and channel mapping. The planned treatment time is verified independently based on analytical methods. For interstitial or SAVI APBI treatment plans, a Patterson-Parker system calculation is performed to verify the planned treatment time. For endobronchial treatments, an analytical formula from TG-59 is used. Acceptable tolerancesmore » were defined based on clinical experiences in our department. The system was designed to show PASS/FAIL status levels. Additional information, if necessary, is indicated appropriately in a separate comments field in the user interface. Results: The HDR Precheck system has been developed and tested to verify the treatment plan parameters that are routinely checked by the clinical physicist. The report also serves as a reminder or checklist for the planner to perform any additional critical checks such as applicator digitization or scenarios where the channel mapping was intentionally changed. It is expected to reduce the current manual plan check time from 15 minutes to <1 minute. Conclusion: Automating brachytherapy plan prechecks significantly reduces treatment plan precheck time and reduces human errors. When fully developed, this system will be able to perform TG-43 based second check of the treatment planning system’s dose calculation using random points in the target and critical structures. A histogram will be generated along with tabulated mean and standard deviation values for each structure. A knowledge database will also be developed for Brachyvision plans which will then be used for knowledge-based plan quality checks to further reduce treatment planning errors and increase confidence in the planned treatment.« less
Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
Autonomous Agents for Dynamic Process Planning in the Flexible Manufacturing System
NASA Astrophysics Data System (ADS)
Nik Nejad, Hossein Tehrani; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka
Rapid changes of market demands and pressures of competition require manufacturers to maintain highly flexible manufacturing systems to cope with a complex manufacturing environment. This paper deals with development of an agent-based architecture of dynamic systems for incremental process planning in the manufacturing systems. In consideration of alternative manufacturing processes and machine tools, the process plans and the schedules of the manufacturing resources are generated incrementally and dynamically. A negotiation protocol is discussed, in this paper, to generate suitable process plans for the target products real-timely and dynamically, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans are searched and generated to cope with both the dynamic changes of the product specifications and the disturbances of the manufacturing resources. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans in the dynamic manufacturing environment.
Design requirements for SRB production control system. Volume 4: Implementation
NASA Technical Reports Server (NTRS)
1981-01-01
The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.
Application of automatic vehicle location in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Hansen, G. R.; Leflang, W. G.
1976-01-01
A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.
Floor Plans Rolling Platform, Tech Systems Platform, and Load ...
Floor Plans - Rolling Platform, Tech Systems Platform, and Load Platform Plans - Marshall Space Flight Center, F-1 Engine Static Test Stand, On Route 565 between Huntsville and Decatur, Huntsville, Madison County, AL
Enterprise resource planning for hospitals.
van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie
2004-06-30
Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.
Implementation of a Web-Based Collaborative Process Planning System
NASA Astrophysics Data System (ADS)
Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi
Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.
Use of business planning methods to monitor global health budgets in Turkmenistan.
Ensor, T.; Amannyazova, B.
2000-01-01
After undergoing many changes, the financing of health care in countries of the former Soviet Union is now showing signs of maturing. Soon after the political transition in these countries, the development of insurance systems and fee-for-service payment systems dominated the discussions on health reform. At present there is increasing emphasis on case mix adjusted payments in larger hospitals and on global budgets in smaller district hospitals. The problem is that such systems are often mistrusted for not providing sufficient financial control. At the same time, unless further planned restructuring is introduced, payment systems cannot on their own induce the fundamental change required in the health care system. As described in this article, in Tejen etrap (district), Turkmenistan, prospective business plans, which link planned objectives and activities with financial allocations, provide a framework for setting and monitoring budget expenditure. Plans can be linked to the overall objectives of the restructuring system and can be used to ensure sound financial management. The process of business planning, which calls for a major change in the way health facilities examine their activities, can be used as a vehicle to increase awareness of management issues. It also provides a way of satisfying the requirement for a rigorous, bottom-up planning of financial resources. PMID:10994288
Gauld, Robin
2002-01-01
Health sector restructuring has been in vogue, but no country has engaged in as much health sector restructuring as New Zealand where, in a decade, there have been four different public health sector structures. This article discusses New Zealand's four structures with an emphasis on relocating the critical functions of health care planning and purchasing, and on the development of the present district health board system. The four structures include: an area health board system (1989-1991) with planning and purchasing located at "home" in local areas and closely aligned with service provision; a competitive internal market system (1993-1996) which separated planning and purchasing from service provision; a centralised system with a "headquarters" controlling planning and purchasing (1997-1999) while maintaining the distance from provision; and the district health board system currently under development (1999-) which sees purchasing and planning sent home again to regions and linked closely with service provision. The present system entails the devolution of considerable responsibility to the local level, within a framework of strong central government control. Based on New Zealand's experience, the article notes that all but the market structure appear to have provided an adequate environment for effective health care planning and purchasing.
The U.S. Federal Radionavigation Plan
NASA Astrophysics Data System (ADS)
Shirer, Heywood O.
The author presents an overview of the 1990 Federal Radionavigation Plan (FRP) policy and a discussion of the status of GPS (Global Positioning System), Loran-C, Omega, VOR/DME (VHF omnidirectional range/distance measuring equipment), VORTAC, TACAN, MLS (Microwave Landing System), ILS (instrument landing systems), Transit, and radiobeacons. The 1990 FRP contains significant changes regarding several of the radionavigation systems. It is concluded that it is difficult at best to ascertain the post-GPS final systems mix of federally provided radionavigation systems. The phase-out dates of other systems in favor of GPS still remain soft. Many uncertainties remain until the capabilities of GPS are verified for all classes of users. The federal radionavigation planning process accommodates such uncertainties, keeping pace with the constantly changing radionavigation user profile and rapid advancements in system technology.
PLANiTS : structuring and supporting the intelligent transportation systems planning process
DOT National Transportation Integrated Search
1997-01-01
PLANiTS (Planning and Analysis Integration for Intelligent Transportation Systems) is a process-based computer system that supports a series of mutually interdependent steps progressing toward developing and programming transportation improvement pro...
2009 Iowa railroad system plan : cover.
DOT National Transportation Integrated Search
2009-01-01
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail ...
2009 Iowa railroad system plan : part I.
DOT National Transportation Integrated Search
2009-01-01
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail ...
2009 Iowa railroad system plan : part III.
DOT National Transportation Integrated Search
2009-01-01
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail ...
2009 Iowa railroad system plan : part II.
DOT National Transportation Integrated Search
2009-01-01
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail ...
TSHIPS : Transportation shipping harmonization and integration planning system
DOT National Transportation Integrated Search
2001-03-01
This report documents the development of the Transportation Shipping Harmonization and Integration Planning System (TSHIPS). The TSHIPS project was developed to advance the state of the art in transportation systems analysis. Existing approaches and ...
2009 Iowa railroad system plan : introduction.
DOT National Transportation Integrated Search
2009-01-01
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail ...
45 CFR 162.508 - Enumeration System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 1 2012-10-01 2012-10-01 false Enumeration System. 162.508 Section 162.508 Public... ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for Health Plans § 162.508 Enumeration System. The Enumeration System must do all of the following: (a) Assign a single, unique— (1) HPID to a health plan...
45 CFR 162.508 - Enumeration System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 1 2014-10-01 2014-10-01 false Enumeration System. 162.508 Section 162.508 Public... ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for Health Plans § 162.508 Enumeration System. The Enumeration System must do all of the following: (a) Assign a single, unique— (1) HPID to a health plan...
45 CFR 162.508 - Enumeration System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 1 2013-10-01 2013-10-01 false Enumeration System. 162.508 Section 162.508 Public... ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for Health Plans § 162.508 Enumeration System. The Enumeration System must do all of the following: (a) Assign a single, unique— (1) HPID to a health plan...
49 CFR 659.23 - System security plan: contents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false System security plan: contents. 659.23 Section 659.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.23 System security...
45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... computerized support enforcement systems. 307.15 Section 307.15 Public Welfare Regulations Relating to Public... CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES COMPUTERIZED SUPPORT ENFORCEMENT SYSTEMS § 307.15 Approval of advance planning documents for computerized support enforcement systems. (a...
State University System of Florida
ERIC Educational Resources Information Center
Board of Governors, State University System of Florida, 2012
2012-01-01
This paper presents some information about the State University System of Florida. The following are presented in this paper: (1) University Work Plans and Annual Reports; (2) State University System 2009 Annual Report; (3) Quick Facts: Planned New Degree Programs--2010 to 2013; (4) State University System Tuition Differential Summary, FY…
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
44 CFR 208.3 - Authority for the National US&R Response System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Order 12148. (b) Implementing plan. The National Response Plan identifies DHS as the primary Federal...&R Response System. 208.3 Section 208.3 Emergency Management and Assistance FEDERAL EMERGENCY... RESPONSE SYSTEM General § 208.3 Authority for the National US&R Response System. (a) Enabling legislation...
Operative planning of functional sessions for multisatellite observation and communication systems
NASA Astrophysics Data System (ADS)
Darnopykh, Valeriy V.; Malyshev, Veniamin V.
2012-04-01
An important control aspect of modern satellite observation and communication systems is the control of the functional processes. Functional sessions proceed under conditions of restricted technical ability, large amounts or information to be processed by the on-board equipment, practice inequality of the received information, intentions of system management and operators, interests of customers and other factors. A large number of spacecrafts (SC) in orbital constellation is one of the most important factors affecting the functional process also. Besides that some modern projects of satellite systems are multifunctional that is mixed operations of observation and communication. Therefore the functioning of SC on-board equipment must be accurately co-ordinate. That is why the problem of operative planning the functioning of these systems, while directly affecting the efficiency of the system, is very complex and actual at present. A methodical approach and software package for operative planning of functional processes for satellite observation and communication systems, including multifunctional projects, are considered in the paper. The base scheme of this approach consists of four main stages: stage 1—modeling of SC orbital kinematics and dynamics; stage 2—modeling of system functional processes with all kind of restrictions and criterion function values; stage 3—solving an optimization tasks by numerical applicable algorithms and constructing the optimal (or accuracy) plans; stage 4—repeated plan optimization (different variants) and analyzing. Such scheme is the result of authors practical research which have been realized during last 15 years by the operative planning as for any kinds of single SC as for satellite systems with different structure of orbital constellation. The research helps to unify the procedure of operative planning, to formulate basic principles and approaches for its solving, to develop special software package. The main aspects of the approach proposed are illustrated in the paper. The results of the calculations of applied planning problems are presented. The objects of research in these problems are: projects of CBERS observation systems (1-3 SC) and projects of Iridium (66 SC) global communication system.
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
NASA Astrophysics Data System (ADS)
Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka
Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.
14 CFR 152.109 - Project eligibility: Airport planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
...; and (5) In the case of a proposed project for airport master planning in a large or medium air traffic hub, in the opinion of the Administrator— (i) There is an appropriate system plan identifying the need for the airport; (ii) The absence of a system plan is due to the failure of the responsible planning...
Operational Plan for Underground Storage Tank 322 R2U2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griffin, D.
2017-06-07
This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
42 CFR 422.266 - Beneficiary rebates.
Code of Federal Regulations, 2011 CFR
2011-10-01
... plan's quality rating under a 5 star rating system, as determined by the Secretary under § 422.258(d)(7... plan with a quality rating under such system of at least 4.5 stars, 70 percent of the average per capita savings; (B) In the case of a plan with a quality rating under such system of at least 3.5 stars...
Development and validation of MCNPX-based Monte Carlo treatment plan verification system
Jabbari, Iraj; Monadi, Shahram
2015-01-01
A Monte Carlo treatment plan verification (MCTPV) system was developed for clinical treatment plan verification (TPV), especially for the conformal and intensity-modulated radiotherapy (IMRT) plans. In the MCTPV, the MCNPX code was used for particle transport through the accelerator head and the patient body. MCTPV has an interface with TiGRT planning system and reads the information which is needed for Monte Carlo calculation transferred in digital image communications in medicine-radiation therapy (DICOM-RT) format. In MCTPV several methods were applied in order to reduce the simulation time. The relative dose distribution of a clinical prostate conformal plan calculated by the MCTPV was compared with that of TiGRT planning system. The results showed well implementation of the beams configuration and patient information in this system. For quantitative evaluation of MCTPV a two-dimensional (2D) diode array (MapCHECK2) and gamma index analysis were used. The gamma passing rate (3%/3 mm) of an IMRT plan was found to be 98.5% for total beams. Also, comparison of the measured and Monte Carlo calculated doses at several points inside an inhomogeneous phantom for 6- and 18-MV photon beams showed a good agreement (within 1.5%). The accuracy and timing results of MCTPV showed that MCTPV could be used very efficiently for additional assessment of complicated plans such as IMRT plan. PMID:26170554
ERIC Educational Resources Information Center
Vlasak, Frances Stetson; Kaufman, Martin J.
Presented is Stage III of the Comprehensive Approach to Pupil Planning (CAPP) System, a three-stage model for planning educational interventions in the regular and special education classrooms and for guiding placement decisions. The guide focuses on the instructional planning team with sections on the following: Stage III personnel; roles and…
OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…
Careful Planning Key to Accurate Fixed Reports Assets.
ERIC Educational Resources Information Center
MaRous, Arnold M.
1986-01-01
Only with careful planning can school business managers develop fixed asset information and good recordkeeping. Use of a simple inventory system and discussion with school districts already utilizing this system will assist planning. (CJH)
The California general plan process and sustainable transportation planning
DOT National Transportation Integrated Search
2002-05-01
This research project assesses California's General Plan process as a tool for implementing sustainable development, with particular emphasis on transportation systems at the local level, including the relationship of local transportation systems to ...
NASA Technical Reports Server (NTRS)
NewMyer, David A.
1999-01-01
Airport congestion at primary airports in major metropolitan areas was analyzed in a report prepared by the Transportation Research Board (TRB) in 1990. Taking the top twenty-three most congested airports from this study, a questionnaire was prepared and sent to the metropolitan planning organizations (MPOs) for twenty of the twenty-three metropolitan areas represented in the TRB study, The questionnaire focused on the role of the MPOs in planning for new primary airports in the United States, including questions about the status of the most recent MPO airport system plan, whether or not the latest plan recommends a new primary airport, and whether or not any other entities in the MPO areas are recommending new primary airports. The results indicated that 44.4 percent of the eighteen respondent MPOs have airport system plans that are five years old or older. Also, only two of the respondent MPOs have recommended a new primary airport in their latest regional airport system plan and only one of these two is a common recommendation in the Federal Aviation Administration's National Plan of Integrated Airport System.
NASA Technical Reports Server (NTRS)
NewMeyer, David A.
1999-01-01
Airport congestion at primary airports in major metropolitan areas was analyzed in a report prepared by the Transportation Research Board (TRB) in 1990. Taking the top twenty-three most congested airports from this study, a questionnaire was prepared and sent to the metropolitan planning organizations (MPOS) for twenty of the twenty-three metropolitan areas represented in the TRB study. The questionnaire focused on the role of the MPOs in planning for new primary airports in the United States, including questions about the status of the most recent MPO airport system plan, whether or not the latest plan recommends a new primary airport, and whether or not any other entities in the MPO areas are recommending new primary airports. The results indicated that 44.4 percent of the eighteen respondent MPOs have airport system plans that are five years old or older. Also, only two of the respondent MPOs have recommended a new primary airport in their latest regional airport system plan and only one of these two is a common recommendation in the Federal Aviation Administration's National Plan of Integrated Airport System.
NASA Astrophysics Data System (ADS)
Petric, Martin Peter
This thesis describes the development and implementation of a novel method for the dosimetric verification of intensity modulated radiation therapy (IMRT) fields with several advantages over current techniques. Through the use of a tissue equivalent plastic scintillator sheet viewed by a charge-coupled device (CCD) camera, this method provides a truly tissue equivalent dosimetry system capable of efficiently and accurately performing field-by-field verification of IMRT plans. This work was motivated by an initial study comparing two IMRT treatment planning systems. The clinical functionality of BrainLAB's BrainSCAN and Varian's Helios IMRT treatment planning systems were compared in terms of implementation and commissioning, dose optimization, and plan assessment. Implementation and commissioning revealed differences in the beam data required to characterize the beam prior to use with the BrainSCAN system requiring higher resolution data compared to Helios. This difference was found to impact on the ability of the systems to accurately calculate dose for highly modulated fields, with BrainSCAN being more successful than Helios. The dose optimization and plan assessment comparisons revealed that while both systems use considerably different optimization algorithms and user-control interfaces, they are both capable of producing substantially equivalent dose plans. The extensive use of dosimetric verification techniques in the IMRT treatment planning comparison study motivated the development and implementation of a novel IMRT dosimetric verification system. The system consists of a water-filled phantom with a tissue equivalent plastic scintillator sheet built into the top surface. Scintillation light is reflected by a plastic mirror within the phantom towards a viewing window where it is captured using a CCD camera. Optical photon spread is removed using a micro-louvre optical collimator and by deconvolving a glare kernel from the raw images. Characterization of this new dosimetric verification system indicates excellent dose response and spatial linearity, high spatial resolution, and good signal uniformity and reproducibility. Dosimetric results from square fields, dynamic wedged fields, and a 7-field head and neck IMRT treatment plan indicate good agreement with film dosimetry distributions. Efficiency analysis of the system reveals a 50% reduction in time requirements for field-by-field verification of a 7-field IMRT treatment plan compared to film dosimetry.
Application of mobile digital communications in law enforcement, an introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Abraham, J. E.; Leflang, W. G.; Kennedy, R. D.; Wilson, J. H.; Gurfield, R. M.
1975-01-01
A set of planning guidelines for the application of digital communications techniques to law enforcement use is presented. Some essential characteristics of digital techniques and their applications are outlined, as are some principles of system analysis, evaluation, and planning. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with respect to this application problem. Information on law enforcement digital communications systems and equipment and a list of vendor sources are given in appendices.
Application of computer-aided dispatch in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.
1975-01-01
A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.
Modeling Transportation Systems : an Overview
DOT National Transportation Integrated Search
1971-06-01
The purpose of this report is to outline the role of systems analysis and mathematical modeling in the planning of transportation systems. The planning process is divided into three sectors (demand, supply, and policy) reflecting the demand for trans...
NASA Technical Reports Server (NTRS)
Rodriguez, Guillermo (Editor)
1990-01-01
Various papers on intelligent control and adaptive systems are presented. Individual topics addressed include: control architecture for a Mars walking vehicle, representation for error detection and recovery in robot task plans, real-time operating system for robots, execution monitoring of a mobile robot system, statistical mechanics models for motion and force planning, global kinematics for manipulator planning and control, exploration of unknown mechanical assemblies through manipulation, low-level representations for robot vision, harmonic functions for robot path construction, simulation of dual behavior of an autonomous system. Also discussed are: control framework for hand-arm coordination, neural network approach to multivehicle navigation, electronic neural networks for global optimization, neural network for L1 norm linear regression, planning for assembly with robot hands, neural networks in dynamical systems, control design with iterative learning, improved fuzzy process control of spacecraft autonomous rendezvous using a genetic algorithm.
Suzuki, Keishiro; Hirasawa, Yukinori; Yaegashi, Yuji; Miyamoto, Hideki; Shirato, Hiroki
2009-01-01
We developed a web-based, remote radiation treatment planning system which allowed staff at an affiliated hospital to obtain support from a fully staffed central institution. Network security was based on a firewall and a virtual private network (VPN). Client computers were installed at a cancer centre, at a university hospital and at a staff home. We remotely operated the treatment planning computer using the Remote Desktop function built in to the Windows operating system. Except for the initial setup of the VPN router, no special knowledge was needed to operate the remote radiation treatment planning system. There was a time lag that seemed to depend on the volume of data traffic on the Internet, but it did not affect smooth operation. The initial cost and running cost of the system were reasonable.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, S; Guerrero, M; Zhang, B
Purpose: To implement a comprehensive non-measurement-based verification program for patient-specific IMRT QA Methods: Based on published guidelines, a robust IMRT QA program should assess the following components: 1) accuracy of dose calculation, 2) accuracy of data transfer from the treatment planning system (TPS) to the record-and-verify (RV) system, 3) treatment plan deliverability, and 4) accuracy of plan delivery. Results: We have implemented an IMRT QA program that consist of four components: 1) an independent re-calculation of the dose distribution in the patient anatomy with a commercial secondary dose calculation program: Mobius3D (Mobius Medical Systems, Houston, TX), with dose accuracy evaluationmore » using gamma analysis, PTV mean dose, PTV coverage to 95%, and organ-at-risk mean dose; 2) an automated in-house-developed plan comparison system that compares all relevant plan parameters such as MU, MLC position, beam iso-center position, collimator, gantry, couch, field size settings, and bolus placement, etc. between the plan and the RV system; 3) use of the RV system to check the plan deliverability and further confirm using “mode-up” function on treatment console for plans receiving warning; and 4) implementation of a comprehensive weekly MLC QA, in addition to routine accelerator monthly and daily QA. Among 1200 verifications, there were 9 cases of suspicious calculations, 5 cases of delivery failure, no data transfer errors, and no failure of weekly MLC QA. These 9 suspicious cases were due to the PTV extending to the skin or to heterogeneity correction effects, which would not have been caught using phantom measurement-based QA. The delivery failure was due to the rounding variation of MLC position between the planning system and RV system. Conclusion: A very efficient, yet comprehensive, non-measurement-based patient-specific QA program has been implemented and used clinically for about 18 months with excellent results.« less
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
Clinical applications of advanced rotational radiation therapy
NASA Astrophysics Data System (ADS)
Nalichowski, Adrian
Purpose: With a fast adoption of emerging technologies, it is critical to fully test and understand its limits and capabilities. In this work we investigate new graphic processing unit (GPU) based treatment planning algorithm and its applications in helical tomotherapy dose delivery. We explore the limits of the system by applying it to challenging clinical cases of total marrow irradiation (TMI) and stereotactic radiosurgery (SRS). We also analyze the feasibility of alternative fractionation schemes for total body irradiation (TBI) and TMI based on reported historical data on lung dose and interstitial pneumonitis (IP) incidence rates. Methods and Materials: An anthropomorphic phantom was used to create TMI plans using the new GPU based treatment planning system and the existing CPU cluster based system. Optimization parameters were selected based on clinically used values for field width, modulation factor and pitch. Treatment plans were also created on Eclipse treatment planning system (Varian Medical Systems Inc, Palo Alto, CA) using volumetric modulated arc therapy (VMAT) for dose delivery on IX treatment unit. A retrospective review was performed of 42 publications that reported IP rates along with lung dose, fractionation regimen, dose rate and chemotherapy. The analysis consisted of nearly thirty two hundred patients and 34 unique radiation regimens. Multivariate logistic regression was performed to determine parameters associated with IP and establish does response function. Results: The results showed very good dosimetric agreement between the GPU and CPU calculated plans. The results from SBRT study show that GPU planning system can maintain 90% target coverage while meeting all the constraints of RTOG 0631 protocol. Beam on time for Tomotherapy and flattening filter free RapidArc was much faster than for Vero or Cyberknife. Retrospective data analysis showed that lung dose and Cyclophosphomide (Cy) are both predictors of IP in TBI/TMI treatments. The dose rate was not found to be an independent risk factor for IP. The model failed to establish accurate dose response function, but the discrete data indicated a radiation dose threshold of 7.6Gy (EQD2_repair) and 120 mg/kg of Cy below which no IP cases were reported. Conclusion: The TomoTherapy GPU based dose engine is capable of calculating TMI treatment plans with plan quality nearly identical to plans calculated using the traditional CPU/cluster based system, while significantly reducing the time required for optimization and dose calculation. The new system was able to achieve more uniform dose distribution throughout the target volume and steeper dose fall off, resulting in superior OAR sparing when compared to Eclipse treatment planning system for VMAT delivery. The machine optimization parameters tested for TMI cases provide a comprehensive overview of the capabilities of the treatment planning station and associated helical delivery system. The new system also proved to be dosimetrically compatible with other leading modalities for treatments of small and complicated target volumes and was even superior when treatment delivery times were compared. These finding demonstrate that the advanced treatment planning and delivery system from TomoTherapy is well suitable for treatments of complicated cases such as TMI and SRS and it's often dosimetrically and/or logistically superior to other modalities. The new planning system can easily meet the constraint of threshold lung dose established in this study. The results presented here on the capabilities of Tomotherapy and on the identified lung dose threshold provide an opportunity to explore alternative fractionation schemes without sacrificing target coverage or lung toxicity. (Abstract shortened by ProQuest.).
WASTE ANALYSIS PLAN REVIEW ADVISOR - AN INTELLIGENT DATABASE TO ASSIST RCRA PERMIT REVIEWERS
The Waste Analysis Plan Review Advisor (WAPRA) system assists in the review of the Waste Analysis Plan Section of RCRA Part B facility permit applications. Specifically, this program automates two functions of the waste analysis plan review. First, the system checks all wastes wh...
48 CFR 1028.307-1 - Group insurance plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...
48 CFR 3028.307-1 - Group insurance plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Group insurance plans. 3028.307-1 Section 3028.307-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY....307-1 Group insurance plans. Plans shall be submitted to the contracting officer, who must obtain the...
48 CFR 3028.307-1 - Group insurance plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Group insurance plans. 3028.307-1 Section 3028.307-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY....307-1 Group insurance plans. Plans shall be submitted to the contracting officer, who must obtain the...
48 CFR 1028.307-1 - Group insurance plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...
48 CFR 1028.307-1 - Group insurance plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...
48 CFR 3028.307-1 - Group insurance plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Group insurance plans. 3028.307-1 Section 3028.307-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY....307-1 Group insurance plans. Plans shall be submitted to the contracting officer, who must obtain the...
48 CFR 1028.307-1 - Group insurance plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Group insurance plans. 1028.307-1 Section 1028.307-1 Federal Acquisition Regulations System DEPARTMENT OF THE TREASURY GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 1028.307-1 Group insurance plans. (a) Plans shall be...
DOT National Transportation Integrated Search
1997-02-01
This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...
ERIC Educational Resources Information Center
Mercado del Collado, Ricardo
Higher education planning in Mexico is discussed, with attention to: conceptual characteristics of Mexico's higher education planning system; relationships among the national, regional, state, and institutional planning levels; and design and operation of the Comprehensive Program for the Development of Higher Education. Responsibilities of…
12 CFR 228.27 - Strategic plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... involvement in formulating the plan, written public comment on the plan, and any response by the bank to... 12 Banks and Banking 3 2012-01-01 2012-01-01 false Strategic plan. 228.27 Section 228.27 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM COMMUNITY...
12 CFR 228.27 - Strategic plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... involvement in formulating the plan, written public comment on the plan, and any response by the bank to... 12 Banks and Banking 3 2011-01-01 2011-01-01 false Strategic plan. 228.27 Section 228.27 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM COMMUNITY...
LISPA (Library and Information Center Staff Planning Advisor): A Microcomputer-Based System.
ERIC Educational Resources Information Center
Devadason, F. J.; Vespry, H. A.
1996-01-01
Describes LISPA (Library and Information Center Staff Planning Advisor), a set of programs based on Ranganathan's staff plan model. LISPA particularly aids in planning for library staff requirements, both professional and paraprofessional, in developing countries where automated systems for other library operations are not yet available.…
Power system restoration - A task force report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adibi, M.; Clelland, P.; Link, L.
1987-05-01
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under.« less
NASA Technical Reports Server (NTRS)
Maag, W.
1977-01-01
The Flight Design System (FDS) and the Unified System for Orbit Computation (USOC) are compared and described in relation to mission planning for the shuttle transportation system (STS). The FDS is designed to meet the requirements of a standardized production tool and the USOC is designed for rapid generation of particular application programs. The main emphasis in USOC is put on adaptability to new types of missions. It is concluded that a software system having a USOC-like structure, adapted to the specific needs of MPAD, would be appropriate to support planning tasks in the area unique to STS missions.
NASA Astrophysics Data System (ADS)
Casagrande, F.; Ganni, V.; Knudsen, P.; Jones, S.; Sidi-Yekhlef, A.; Tatsumoto, H.; Nguyen, C.; Fila, A.; Vargas, G.; Dudley, C.; Joseph, N.; Stanley, S.; Dixon, K.; Norton, R.; Laverdure, N.; Yang, S.
2017-12-01
Construction and installation of the FRIB 4.5 K helium refrigeration system is nearing completion, with compressor system commissioning and 4.5 K refrigerator commissioning on schedule to occur in late 2017. The LINAC 4.5 K helium distribution system, all major process equipment, and the cryogenic distribution for the sub-systems have been procured and delivered. The sub-atmospheric cold box fabrication is planned to begin the summer of 2017, which is on schedule for commissioning in the spring of 2018. Commissioning of the support systems, such as the helium gas storage, helium purifier, and oil processor is planned to be complete by the summer of 2017. This paper presents details of the equipment procured, installation status and commissioning plans.
Case study in health information management: strategic planning.
Homan, C V
1992-08-01
The strategic planning process has proven to be invaluable to Riverside Hospital's success. Involvement of all levels of the organization and integration of plans solidifies organizational commitments and provides a framework that assures accomplishment of overall goals. With major developments in computerization of medical records and other systems that support patient care data analysis on the horizon, Riverside's integrated plans are defining crucial information system projects. As the pool of available resources for projects continues to shrink, the planning format described assures funding of information system needs that will secure a position for Riverside in the health care marketplace of the future.
Planning and Execution for an Autonomous Aerobot
NASA Technical Reports Server (NTRS)
Gaines, Daniel M.; Estlin, Tara A.; Schaffer, Steven R.; Chouinard, Caroline M.
2010-01-01
The Aerial Onboard Autonomous Science Investigation System (AerOASIS) system provides autonomous planning and execution capabilities for aerial vehicles (see figure). The system is capable of generating high-quality operations plans that integrate observation requests from ground planning teams, as well as opportunistic science events detected onboard the vehicle while respecting mission and resource constraints. AerOASIS allows an airborne planetary exploration vehicle to summarize and prioritize the most scientifically relevant data; identify and select high-value science sites for additional investigation; and dynamically plan, schedule, and monitor the various science activities being performed, even during extended communications blackout periods with Earth.
Ground data systems resource allocation process
NASA Technical Reports Server (NTRS)
Berner, Carol A.; Durham, Ralph; Reilly, Norman B.
1989-01-01
The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.
Evaluation of Dosimetry Check software for IMRT patient-specific quality assurance.
Narayanasamy, Ganesh; Zalman, Travis; Ha, Chul S; Papanikolaou, Niko; Stathakis, Sotirios
2015-05-08
The purpose of this study is to evaluate the use of the Dosimetry Check system for patient-specific IMRT QA. Typical QA methods measure the dose in an array dosimeter surrounded by homogenous medium for which the treatment plan has been recomputed. With the Dosimetry Check system, fluence measurements acquired on a portal dosimeter is applied to the patient's CT scans. Instead of making dose comparisons in a plane, Dosimetry Check system produces isodose lines and dose-volume histograms based on the planning CT images. By exporting the dose distribution from the treatment planning system into the Dosimetry Check system, one is able to make a direct comparison between the calculated dose and the planned dose. The versatility of the software is evaluated with respect to the two IMRT techniques - step and shoot and volumetric arc therapy. The system analyzed measurements made using EPID, PTW seven29, and IBA MatriXX, and an intercomparison study was performed. Plans from patients previously treated at our institution with treated anatomical site on brain, head & neck, liver, lung, and prostate were analyzed using Dosimetry Check system for any anatomical site dependence. We have recommendations and possible precautions that may be necessary to ensure proper QA with the Dosimetry Check system.
Integration of second cancer risk calculations in a radiotherapy treatment planning system
NASA Astrophysics Data System (ADS)
Hartmann, M.; Schneider, U.
2014-03-01
Second cancer risk in patients, in particular in children, who were treated with radiotherapy is an important side effect. It should be minimized by selecting an appropriate treatment plan for the patient. The objectives of this study were to integrate a risk model for radiation induced cancer into a treatment planning system which allows to judge different treatment plans with regard to second cancer induction and to quantify the potential reduction in predicted risk. A model for radiation induced cancer including fractionation effects which is valid for doses in the radiotherapy range was integrated into a treatment planning system. From the three-dimensional (3D) dose distribution the 3D-risk equivalent dose (RED) was calculated on an organ specific basis. In addition to RED further risk coefficients like OED (organ equivalent dose), EAR (excess absolute risk) and LAR (lifetime attributable risk) are computed. A risk model for radiation induced cancer was successfully integrated in a treatment planning system. Several risk coefficients can be viewed and used to obtain critical situations were a plan can be optimised. Risk-volume-histograms and organ specific risks were calculated for different treatment plans and were used in combination with NTCP estimates for plan evaluation. It is concluded that the integration of second cancer risk estimates in a commercial treatment planning system is feasible. It can be used in addition to NTCP modelling for optimising treatment plans which result in the lowest possible second cancer risk for a patient.
NASA Astrophysics Data System (ADS)
Xing, Aitang; Arumugam, Sankar; Holloway, Lois; Goozee, Gary
2014-03-01
Scripting in radiotherapy treatment planning systems not only simplifies routine planning tasks but can also be used for clinical research. Treatment planning scripting can only be utilized in a system that has a built-in scripting interface. Among the commercially available treatment planning systems, Pinnacle (Philips) and Raystation (Raysearch Lab.) have inherent scripting functionality. CMS XiO (Elekta) is a widely used treatment planning system in radiotherapy centres around the world, but it does not have an interface that allows the user to script radiotherapy plans. In this study an external scripting interface, PyCMSXiO, was developed for XiO using the Python programming language. The interface was implemented as a python package/library using a modern object-oriented programming methodology. The package was organized as a hierarchy of different classes (objects). Each class (object) corresponds to a plan object such as the beam of a clinical radiotherapy plan. The interface of classes was implemented as object functions. Scripting in XiO using PyCMSXiO is comparable with Pinnacle scripting. This scripting package has been used in several research projects including commissioning of a beam model, independent three-dimensional dose verification for IMRT plans and a setup-uncertainty study. Ease of use and high-level functions provided in the package achieve a useful research tool. It was released as an open-source tool that may benefit the medical physics community.
Reasoning and planning in dynamic domains: An experiment with a mobile robot
NASA Technical Reports Server (NTRS)
Georgeff, M. P.; Lansky, A. L.; Schoppers, M. J.
1987-01-01
Progress made toward having an autonomous mobile robot reason and plan complex tasks in real-world environments is described. To cope with the dynamic and uncertain nature of the world, researchers use a highly reactive system to which is attributed attitudes of belief, desire, and intention. Because these attitudes are explicitly represented, they can be manipulated and reasoned about, resulting in complex goal-directed and reflective behaviors. Unlike most planning systems, the plans or intentions formed by the system need only be partly elaborated before it decides to act. This allows the system to avoid overly strong expectations about the environment, overly constrained plans of action, and other forms of over-commitment common to previous planners. In addition, the system is continuously reactive and has the ability to change its goals and intentions as situations warrant. Thus, while the system architecture allows for reasoning about means and ends in much the same way as traditional planners, it also posseses the reactivity required for survival in complex real-world domains. The system was tested using SRI's autonomous robot (Flakey) in a scenario involving navigation and the performance of an emergency task in a space station scenario.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Freight planning support system : final summary report
DOT National Transportation Integrated Search
2003-07-01
This report summarizes the activities and the findings of the Freight Planning Support System (FPSS) project conducted for the North Jersey Transportation Planning Authority (NJTPA). The underlying purpose of the project is to allow for better projec...
Advanced rural transportation systems (ARTS) : strategic plan
DOT National Transportation Integrated Search
1997-08-01
This Strategic Plan has been developed for the Advanced Rural Transportation Systems (ARTS) portion of the ITS Program. The plan focuses on the Federal Government's role in developing rural ITS options and prudently managing emerging ITS technologies...
Space telescope observatory management system preliminary test and verification plan
NASA Technical Reports Server (NTRS)
Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.
1982-01-01
The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.
Transportation Institutional Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader'smore » convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.« less
Transmission Planning Analysis Tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
2015-06-23
Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysismore » and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less
Task planning and control synthesis for robotic manipulation in space applications
NASA Technical Reports Server (NTRS)
Sanderson, A. C.; Peshkin, M. A.; Homem-De-mello, L. S.
1987-01-01
Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.
The EMS system and disaster planning: some observations.
Holloway, R D; Steliga, J F; Ryan, C T
1978-02-01
Disaster planning, one of the 15 essential components of the Emergency Medical Service System Act of 1973, should be the culmination of the establishment of other components. Regions have gone to varying lengths to describe disaster plans but how realistic the plans are is questionable. New York has planned for multiple casualty incidents (MCI) to care for victims of fires, explosions, structural collapses and major transportation incidents. The irrational emotional response in mass disasters conflicts with the rational disaster plans written by health planners. Drills of disaster plans are not realistic. One solution is to designate the next serious incident, such as a fire or traffic accident, a major MCI. The ability to handle an MCI is probably the best measure of an EMS system's effectiveness.
Underground storage tank management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-09-01
The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less
[Preliminary application of scripting in RayStation TPS system].
Zhang, Jianying; Sun, Jing; Wang, Yun
2013-07-01
Discussing the basic application of scripting in RayStation TPS system. On the RayStation 3.0 Platform, the programming methods and the points should be considered during basic scripting application were explored with the help of utility scripts. The typical planning problems in the field of beam arrangement and plan outputting were used as examples by ironprthon language. The necessary properties and the functions of patient object for script writing can be extracted from RayStation system. With the help of NET controls, planning functions such as the interactive parameter input, treatment planning control and the extract of the plan have been realized by scripts. With the help of demo scripts, scripts can be developed in RayStation, as well as the system performance can be upgraded.
Computers and Information Systems in Planning and Related Governmental Functions.
ERIC Educational Resources Information Center
Tucker, Dorothy; Vance, Mary, Ed.
The 266 items cited include material published since July 1960, organized in the following ten groups: (1) general discussion, and feasibility; (2) statewide electronic data processing (EDP) systems; (3) EDP in local governments; (4) intergovernmental EDP systems; (5) EDP in the planning agency; (6) data banks and information systems; (7) computer…
Metis Hub: The Development of an Intuitive Project Planning System
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, Rachael M.; Lawrence Livermore National Lab.
2015-08-26
The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.
Planning Non-Formal Education Curricula: The Case of Israel.
ERIC Educational Resources Information Center
Keller, Diana; Dror, Ilana
This paper compares the formal and non-formal education systems currently operating in Israel, describing the special features of curriculum planning in non-formal education. The central argument is that the non-formal education system fulfills functions that constitute a critique of the formal education system. The non-formal system offers the…
50 CFR 80.81 - What must an agency submit when applying for a comprehensive-management-system grant?
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the agency's comprehensive management system including inventory, strategic plan, operational plan... for a comprehensive-management-system grant? 80.81 Section 80.81 Wildlife and Fisheries UNITED STATES... when applying for a comprehensive-management-system grant? A State fish and wildlife agency must submit...
Inventorying national forest resources...for planning-programing-budgeting system
Miles R. Hill; Elliot L. Amidon
1968-01-01
New systems for analyzing resource management problems, such as Planning-Programing-Budgeting, will require automated procedures to collect and assemble resource inventory data. A computer - oriented system called Map Information Assembly and Display System developed for this purpose was tested on a National Forest in California. It provided information on eight forest...
NASA Technical Reports Server (NTRS)
Bedrax-Weiss, Tania; Jonsson, Ari K.; Frank, Jeremy D.; McGann, Conor
2003-01-01
Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the xectieonfvii rnm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.
Reliability demonstration test for load-sharing systems with exponential and Weibull components
Hu, Qingpei; Yu, Dan; Xie, Min
2017-01-01
Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn’t yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics. PMID:29284030
Reliability demonstration test for load-sharing systems with exponential and Weibull components.
Xu, Jianyu; Hu, Qingpei; Yu, Dan; Xie, Min
2017-01-01
Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn't yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics.
Cape Cod National Seashore intelligent transportation systems implementation plan: final report
DOT National Transportation Integrated Search
2011-03-18
The Volpe National Transportation Systems Center (Volpe Center) is providing technical support to the Cape Cod National Seashore in the planning of an Intelligent Transportation System (ITS). In collaboration with the Cape Cod Commission, National Se...
40 CFR 63.11495 - What are the management practices and other requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... repair. (b) Small heat exchange systems. For each heat exchange system subject to this subpart with a...) You must develop and operate in accordance with a heat exchange system inspection plan. The plan must...
40 CFR 63.11495 - What are the management practices and other requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... repair. (b) Small heat exchange systems. For each heat exchange system subject to this subpart with a...) You must develop and operate in accordance with a heat exchange system inspection plan. The plan must...
Stakeholder Attitudes, Knowledge and Engagement in Local Road Systems Planning and Decision Making
DOT National Transportation Integrated Search
2017-10-01
Political and policy dynamics associated with local road systems planning, management, and financing merit special attention. This study: 1) analyzes stakeholder attitudes, knowledge, and engagement about financing for local road system management, t...
Louisiana Airport System Plan : measures of performance.
DOT National Transportation Integrated Search
1992-07-01
This report applies measures of performance to gauge the extent to which the airport system achieves its goals and objectives by the implementation of the Airport System Plan. Measures of Performance are expressed as percentages of the given demograp...
Geographic information system development in the CARETS project
Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.
1977-01-01
Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.
NASA Astrophysics Data System (ADS)
Moghaddam, Kamran S.; Usher, John S.
2011-07-01
In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.
Smessaert, A H
1992-10-01
In the late 1980s Holy Cross Health System (HCHS), South Bend, IN, began to implement a revised strategic planning and budgeting process to effectively link the system's mission with its day-to-day operations. Leaders wanted a process that would help system employees internalize and act on the four major elements articulated in the HCHS mission statement: fidelity, excellence, empowerment, and stewardship. Representatives from mission, strategic planning, and finance from the corporate office and subsidiaries examined planning and budgeting methods. From the beginning, HCHS leaders decided that the process should be implemented gradually, with each step focusing on refining methodology and improving mission integration. As the process evolved. HCHS developed a sequence in which planning preceded budgeting. The system also developed a variety of educational and collaborative initiatives to help system employees adapt to the organization's change of direction. One critical aspect of HCHS's ongoing education is an ethical reflection process that helps participants balance ethical considerations by viewing an issue from three perspectives: social vision, multiple responsibility, and self-interest.
Leonhardt, Kathryn Kraft; Keuler, Megan; Safdar, Nasia; Hunter, Paul
2016-08-01
We describe the collaborative approach used by 2 health systems in Wisconsin to plan and prepare for the threat of Ebola virus disease. This was a descriptive study of the preparedness planning, infection prevention, and collaboration with public health agencies undertaken by 2 health systems in Wisconsin between September and December 2014. The preparedness approach used by the 2 health systems relied successfully on their robust infrastructure for planning and infection prevention. In the setting of rapidly evolving guidance and unprecedented fear regarding Ebola, the 2 health systems enhanced their response through collaboration and coordination with each other and government public health agencies. Key lessons learned included the importance of a rigorous planning process, robust infection prevention practices, and coalitions between public and private health sectors. The potential threat of Ebola virus disease stimulated emergency preparedness in which acute care facilities played a leading role in the public health response. Leveraging the existing expertise of health systems is essential when faced with emerging infectious diseases. (Disaster Med Public Health Preparedness. 2016;10:691-697).
ERIC Educational Resources Information Center
Fairchild-Pierce, Jennifer Elis
2008-01-01
This dissertation provides historical insight into the design and implementation of one strategic plan of a public higher education system in an effort to inform future similar strategic planning processes. On July 1, 1994, the Board of Regents appointed Stephen R. Portch the ninth Chancellor of the University System of Georgia. The timing was…
Design and Implementation of the PMS Module for ’Argos’
1989-12-01
designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and benefits such a...analyzing, designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and... design and implementation. PMS is the system developed by the navy to provide each ship, department, and supervisor with the tools needed to plan
ERIC Educational Resources Information Center
Capoor, Madan
The Objective-Based Assessment, Planning, and Resource Allocation System (OAPRAS) that was developed and implemented at Middlesex County College is described. The integrated self-assessment planning and budgeting system was developed in 1981. The central purpose of OAPRAS was to link resource allocation decisions to the prioritized objectives that…
ERIC Educational Resources Information Center
National Forum on Education Statistics, 2010
2010-01-01
This document, "Book Two of Four: Planning and Developing an LDS", is the second installment of this Forum (National Forum on Education Statistics) series of guides on longitudinal data systems (LDS). This second book in the guide series delves into the planning, implementation, and evaluation phases of a longitudinal data system (LDS)…
ERIC Educational Resources Information Center
Rahim, Syed A.
Based in part on a list developed by the United Nations Educational, Scientific, and Cultural Organization (UNESCO) for use in Afghanistan, this document presents a comprehensive checklist of items of statistical and descriptive data required for planning a national communication system. It is noted that such a system provides the vital…
SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions
NASA Technical Reports Server (NTRS)
Kao, Cheng-Yan; Lee, Seok-Hua
1992-01-01
The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.
Mission Operations Planning and Scheduling System (MOPSS)
NASA Technical Reports Server (NTRS)
Wood, Terri; Hempel, Paul
2011-01-01
MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.
Region Three Aerial Measurement System Flight Planning Tool - 12006
DOE Office of Scientific and Technical Information (OSTI.GOV)
Messick, Chuck; Pham, Minh; Smith, Ron
The Region 3 Aerial Measurement System Flight Planning Tool is used by the National Nuclear Security Agency (NNSA), United States Department of Energy, Radiological Assistance Program, Region 3, to respond to emergency radiological situations. The tool automates the flight planning package process while decreasing Aerial Measuring System response times and decreases the potential for human error. Deployment of the Region Three Aerial Measurement System Flight Planning Tool has resulted in an immediate improvement to the flight planning process in that time required for mission planning has been reduced from 1.5 hours to 15 minutes. Anecdotally, the RAP team reports thatmore » the rate of usable data acquired during surveys has improved from 40-60 percent to over 90 percent since they began using the tool. Though the primary product of the flight planning tool is a pdf format document for use by the aircraft flight crew, the RAP team has begun carrying their laptop computer on the aircraft during missions. By connecting a Global Positioning System (GPS) device to the laptop and using ESRI ArcMap's GPS tool bar to overlay the aircraft position directly on the flight plan in real time, the RAP team can evaluate and correct the aircraft position as the mission is executed. (authors)« less
Safer Systems: A NextGen Aviation Safety Strategic Goal
NASA Technical Reports Server (NTRS)
Darr, Stephen T.; Ricks, Wendell R.; Lemos, Katherine A.
2008-01-01
The Joint Planning and Development Office (JPDO), is charged by Congress with developing the concepts and plans for the Next Generation Air Transportation System (NextGen). The National Aviation Safety Strategic Plan (NASSP), developed by the Safety Working Group of the JPDO, focuses on establishing the goals, objectives, and strategies needed to realize the safety objectives of the NextGen Integrated Plan. The three goal areas of the NASSP are Safer Practices, Safer Systems, and Safer Worldwide. Safer Practices emphasizes an integrated, systematic approach to safety risk management through implementation of formalized Safety Management Systems (SMS) that incorporate safety data analysis processes, and the enhancement of methods for ensuring safety is an inherent characteristic of NextGen. Safer Systems emphasizes implementation of safety-enhancing technologies, which will improve safety for human-centered interfaces and enhance the safety of airborne and ground-based systems. Safer Worldwide encourages coordinating the adoption of the safer practices and safer systems technologies, policies and procedures worldwide, such that the maximum level of safety is achieved across air transportation system boundaries. This paper introduces the NASSP and its development, and focuses on the Safer Systems elements of the NASSP, which incorporates three objectives for NextGen systems: 1) provide risk reducing system interfaces, 2) provide safety enhancements for airborne systems, and 3) provide safety enhancements for ground-based systems. The goal of this paper is to expose avionics and air traffic management system developers to NASSP objectives and Safer Systems strategies.
Adaptable mission planning for kino-dynamic systems
NASA Astrophysics Data System (ADS)
Bush, Lawrence A. M.; Jimenez, Tony R.; Williams, Brian C.
Autonomous systems can perform tasks that are dangerous, monotonous, or even impossible for humans. To approach the problem of planning for Unmanned Aerial Vehicles (UAVs) we present a hierarchical method that combines a high-level planner with a low-level planner. We pose the problem of high-level planning as a Selective Traveling Salesman Problem (STSP) and select the order in which to visit our science sites. We then use a kino-dynamic path planner to create a large number of intermediate waypoints. This is a complete system that combines high and low level planning to achieve a goal. This paper demonstrates the benefits gained by adaptable high-level plans versus static and greedy plans.
NASDA knowledge-based network planning system
NASA Technical Reports Server (NTRS)
Yamaya, K.; Fujiwara, M.; Kosugi, S.; Yambe, M.; Ohmori, M.
1993-01-01
One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.
Innovative applications of artificial intelligence
NASA Astrophysics Data System (ADS)
Schorr, Herbert; Rappaport, Alain
Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.
Wegener, Jessica; Raine, Kim D; Hanning, Rhona M
2012-11-12
Government actors have an important role to play in creating healthy public policies and supportive environments to facilitate access to safe, affordable, nutritious food. The purpose of this research was to examine Waterloo Region (Ontario, Canada) as a case study for "what works" with respect to facilitating access to healthy, local food through regional food system policy making. Policy and planning approaches were explored through multi-sectoral perspectives of: (a) the development and adoption of food policies as part of the comprehensive planning process; (b) barriers to food system planning; and (c) the role and motivation of the Region's public health and planning departments in food system policy making. Forty-seven in-depth interviews with decision makers, experts in public health and planning, and local food system stakeholders provided rich insight into strategic government actions, as well as the local and historical context within which food system policies were developed. Grounded theory methods were used to identify key overarching themes including: "strategic positioning", "partnerships" and "knowledge transfer" and related sub-themes ("aligned agendas", "issue framing", "visioning" and "legitimacy"). A conceptual framework to illustrate the process and features of food system policy making is presented and can be used as a starting point to engage multi-sectoral stakeholders in plans and actions to facilitate access to healthy food.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2407.102 Section 2407.102 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 2407.102 Policy. The Senior...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2407.102 Section 2407.102 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 2407.102 Policy. The Senior...
Orange County intelligent vehicle/highway systems study : IVHS action plan
DOT National Transportation Integrated Search
1997-01-21
This report is a result of the efforts undertaken for Task 6 of the Orange County : Intelligent Vehicle-Highway Systems (IVHS) Study, the development of an Action Plan for : implementation of the Orange County IVHS Master Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Luo, G
2014-06-01
Purpose: In order to receive DICOM files from treatment planning system and generate patient isocenter positioning parameter file for CT laser system automatically, this paper presents a method for communication with treatment planning system and calculation of isocenter parameter for each radiation field. Methods: Coordinate transformation and laser positioning file formats were analyzed, isocenter parameter was calculated via data from DICOM CT Data and DICOM RTPLAN file. An in-house software-DicomGenie was developed based on the object-oriented program platform-Qt with DCMTK SDK (Germany OFFIS company DICOM SDK) . DicomGenie was tested for accuracy using Philips CT simulation plan system (Tumor LOC,more » Philips) and A2J CT positioning laser system (Thorigny Sur Marne, France). Results: DicomGenie successfully established DICOM communication between treatment planning system, DICOM files were received by DicomGenie and patient laser isocenter information was generated accurately. Patient laser parameter data files can be used for for CT laser system directly. Conclusion: In-house software DicomGenie received and extracted DICOM data, isocenter laser positioning data files were created by DicomGenie and can be use for A2J laser positioning system.« less
Principles for Health System Capacity Planning: Insights for Healthcare Leaders.
Shaw, James; Wong, Ivy; Griffin, Bailey; Robertson, Michael; Bhatia, R Sacha
2017-01-01
Jurisdictions across Canada and around the world face the challenge of planning high-performing and sustainable health systems in response to growing healthcare demands. In this paper, we report on the process of developing principles for health system capacity planning by the Ministry of Health and Long-Term Care in Ontario. Integrating the results of a literature review on health system planning and a symposium with representatives from local health integration networks, we describe the following six principles in detail: (1) develop an aspirational vision, (2) establish clear leadership, (3) commit to stakeholder engagement, (4) engage patients and the public, (5) build analytics infrastructure and (6) revise policy when necessary.
NASA Technical Reports Server (NTRS)
Kalu, Alex
1990-01-01
The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.
A Search Algorithm for Generating Alternative Process Plans in Flexible Manufacturing System
NASA Astrophysics Data System (ADS)
Tehrani, Hossein; Sugimura, Nobuhiro; Tanimizu, Yoshitaka; Iwamura, Koji
Capabilities and complexity of manufacturing systems are increasing and striving for an integrated manufacturing environment. Availability of alternative process plans is a key factor for integration of design, process planning and scheduling. This paper describes an algorithm for generation of alternative process plans by extending the existing framework of the process plan networks. A class diagram is introduced for generating process plans and process plan networks from the viewpoint of the integrated process planning and scheduling systems. An incomplete search algorithm is developed for generating and searching the process plan networks. The benefit of this algorithm is that the whole process plan network does not have to be generated before the search algorithm starts. This algorithm is applicable to large and enormous process plan networks and also to search wide areas of the network based on the user requirement. The algorithm can generate alternative process plans and to select a suitable one based on the objective functions.
Streamlining Collaborative Planning in Spacecraft Mission Architectures
NASA Technical Reports Server (NTRS)
Misra, Dhariti; Bopf, Michel; Fishman, Mark; Jones, Jeremy; Kerbel, Uri; Pell, Vince
2000-01-01
During the past two decades, the planning and scheduling community has substantially increased the capability and efficiency of individual planning and scheduling systems. Relatively recently, research work to streamline collaboration between planning systems is gaining attention. Spacecraft missions stand to benefit substantially from this work as they require the coordination of multiple planning organizations and planning systems. Up to the present time this coordination has demanded a great deal of human intervention and/or extensive custom software development efforts. This problem will become acute with increased requirements for cross-mission plan coordination and multi -spacecraft mission planning. The Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center is taking innovative steps to define collaborative planning architectures, and to identify coordinated planning tools for Cross-Mission Campaigns. Prototypes are being developed to validate these architectures and assess the usefulness of the coordination tools by the planning community. This presentation will focus on one such planning coordination too], named Visual Observation Layout Tool (VOLT), which is currently being developed to streamline the coordination between astronomical missions
Advanced Air Traffic Management System Study Overview
DOT National Transportation Integrated Search
1975-06-01
This report summarizes the U.S. Department of Transportation study and development plans for the air traffic management system of the late 1980's and beyond. The plans are presented in the framework of an evolutionary system concept of traffic manage...
Advanced Air Traffic Management System Study : Executive Summary
DOT National Transportation Integrated Search
1975-01-01
This report summarizes the U.S. Department of Transportation study and development plans for the air traffic management system of the late 1980's and beyond. The plans are presented in the framework of an evolutionary system concept of traffic manage...
DOT National Transportation Integrated Search
1976-03-01
This introductory portion of a system science for tranportation planning, which is based on the statistical physics of ensembles, a foundations laid on how statistical mechanics, equilibrium thermodynamics, and near equilbrium thermodynamics can be u...
Management Information in Tertiary Institutions.
ERIC Educational Resources Information Center
Findlay, A. W.
1981-01-01
A college or university's management information system corresponds roughly to the institution's structure, with these elements in descending order in the hierarchy: policy and planning, a planning system, control and coordination, and typical operating systems (payroll, exams, scheduling, library, facilities assignments, and accounting…
Advanced Air Traffic Management System Study - Technical Summary
DOT National Transportation Integrated Search
1975-03-01
This report summarizes the U.S. Department of Transportation study and development plans for the air traffic management system of the late 1980's and beyond. The plans are presented in the framework of an evolutionary system concept of traffic manage...
48 CFR 207.471 - Funding requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Funding requirements. 207.471 Section 207.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Equipment Lease or Purchase 207.471 Funding...
48 CFR 207.471 - Funding requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Funding requirements. 207.471 Section 207.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Equipment Lease or Purchase 207.471 Funding...
48 CFR 207.471 - Funding requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Funding requirements. 207.471 Section 207.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Equipment Lease or Purchase 207.471 Funding...
48 CFR 207.471 - Funding requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Funding requirements. 207.471 Section 207.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE ACQUISITION PLANNING ACQUISITION PLANNING Equipment Lease or Purchase 207.471 Funding...
Weather variability and adaptive management for rangeland restoration
USDA-ARS?s Scientific Manuscript database
Inherent weather variability in upland rangeland systems requires relatively long-term goal setting, and contingency planning for partial success or failure in any given year. Rangeland plant communities are dynamic systems and successional planning is essential for achieving and maintaining system...
Strategic planning for health care management information systems.
Rosenberger, H R; Kaiser, K M
1985-01-01
Using a planning methodology and a structured design technique for analyzing data and data flow, information requirements can be derived to produce a strategic plan for a management information system. Such a long-range plan classifies information groups and assigns them priorities according to the goals of the organization. The approach emphasizes user involvement.
General Guide for Community College System Physical Planning. 2nd Printing.
ERIC Educational Resources Information Center
Mogi, Hitoshi
Part I describes a general outline for producing long range development plans for the Hawaii Community College System. Long-range planning is defined and discussed in terms of basic elements of academic requirements, quality of campus, space requirements, environmental factors, administrative factors, and adjustment factors of the general plans.…
Intelligent Tools for Planning Knowledge base Development and Verification
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.
Static and Completion Analysis for Planning Knowledge Base Development and Verification
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.
State Vocational Education Planning: An Assessment of Issues and Problems.
ERIC Educational Resources Information Center
Lawrence, John E. S., Ed.; Dane, J. K., Ed.
The Dynamic Analysis and Strategic Planning (DASP) Program Division of the Center for Occupational Education at North Carolina State University is concerned with its need for information about the actual operation of planning systems and the development of a planning and information system for vocational education. To this end a three part…
12 CFR 228.27 - Strategic plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... response by the bank to public comment on the plan. (3) Criteria for evaluating plan. The Board evaluates a... 12 Banks and Banking 3 2013-01-01 2013-01-01 false Strategic plan. 228.27 Section 228.27 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM (CONTINUED...
12 CFR 228.27 - Strategic plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... response by the bank to public comment on the plan. (3) Criteria for evaluating plan. The Board evaluates a... 12 Banks and Banking 3 2014-01-01 2014-01-01 false Strategic plan. 228.27 Section 228.27 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM (CONTINUED...
NASA Technical Reports Server (NTRS)
Kushner, Laura K.; Drain, Bethany A.; Schairer, Edward T.; Heineck, James T.; Bell, James H.
2017-01-01
Both AoA and MDM measurements can be made using an optical system that relies on photogrammetry. Optical measurements are being requested by customers in wind tunnels with increasing frequency due to their non-intrusive nature and recent hardware and software advances that allow measurements to become near real time. The NASA Ames Research Center Unitary Plan Wind Tunnel is currently developing a system based on photogrammetry to measure model deformation and model angle of attack. This paper describes the new system, its development, its use on recent tests and plans to further develop the system.
Mehrtak, Mohamad; Vatankhah, Soodabeh; Delgoshaei, Bahram; Gholipour, Arian
2014-01-01
Background: Succession planning promotes the culture of private ownership, staff loyalty to the organization and develops organizational commitment, and increases organizational stability. The study was conducted to examine the status of succession planning in the Iranian health system in order to highlight the key concepts, provide new insight, and attract the attention of senior managers of the Ministry of Health and Medical Education to the importance of succession planning in achieving organizational goals. Methods: In a qualitative study with a framework analysis approach, semi-structured interviews were conducted with a sample selected using purposive and snowball sampling procedure. The MAXQDA-10 was used to apply the codes and manage the data. The codes were extracted using inductive and deductive methods. Results: Fourteen themes and six main subthemes were identified, including planning, organizational culture, system approach, competency model, career path, and senior managers. Our findings indicate a lack of succession planning in the Iranian health system. Conclusion: lack of succession planning could lead to inefficiency and ineffectiveness in health services provision. Implementation of succession planning could maximize human resources utilization. PMID:25168998
Mehrtak, Mohamad; Vatankhah, Soodabeh; Delgoshaei, Bahram; Gholipour, Arian
2014-05-30
Succession planning promotes the culture of private ownership, staff loyalty to the organization and develops organizational commitment, and increases organizational stability. The study was conducted to examine the status of succession planning in the Iranian health system in order to highlight the key concepts, provide new insight, and attract the attention of senior managers of the Ministry of Health and Medical Education to the importance of succession planning in achieving organizational goals. In a qualitative study with a framework analysis approach, semi-structured interviews were conducted with a sample selected using purposive and snowball sampling procedure. The MAXQDA-10 was used to apply the codes and manage the data. The codes were extracted using inductive and deductive methods. Fourteen themes and six main subthemes were identified, including planning, organizational culture, system approach, competency model, career path, and senior managers. Our findings indicate a lack of succession planning in the Iranian health system. lack of succession planning could lead to inefficiency and ineffectiveness in health services provision. Implementation of succession planning could maximize human resources utilization.
NASA Technical Reports Server (NTRS)
Thalman, Nancy E.; Sparn, Thomas P.
1990-01-01
SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.
A planning language for activity scheduling
NASA Technical Reports Server (NTRS)
Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael
1991-01-01
Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.
A knowledge-based approach to improving optimization techniques in system planning
NASA Technical Reports Server (NTRS)
Momoh, J. A.; Zhang, Z. Z.
1990-01-01
A knowledge-based (KB) approach to improve mathematical programming techniques used in the system planning environment is presented. The KB system assists in selecting appropriate optimization algorithms, objective functions, constraints and parameters. The scheme is implemented by integrating symbolic computation of rules derived from operator and planner's experience and is used for generalized optimization packages. The KB optimization software package is capable of improving the overall planning process which includes correction of given violations. The method was demonstrated on a large scale power system discussed in the paper.
The planning and construction of Distributed Energy System in Qingdao Sino-German Eco-park
NASA Astrophysics Data System (ADS)
Wei, Cun; Zhang, Gaijing; Song, Peipei
2018-04-01
This paper introduce the development and characteristics of new energy, Eco-city and Distributed Energy System in China, a case study of Qingdao Sino-German Eco-park, research on practical application about planning and construction of Distributed Energy System in Eco-city. Results show that: we must first do a good job in energy planning, giving full play to their own advantages, and Distributed Energy System based renewable energy resources is a promising option for reducing emissions from electricity generation in Eco-city.
Expert systems tools for Hubble Space Telescope observation scheduling
NASA Technical Reports Server (NTRS)
Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark
1987-01-01
The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.
Hybrid Co-Evolutionary Motion Planning via Visibility-Based Repair
NASA Technical Reports Server (NTRS)
Dozier, Gerry; McCullough, Shaun; Brown, Edward, Jr.; Homaifar, Abdollah; Bikdash, Mar-wan
1997-01-01
This paper introduces a hybrid co-evolutionary system for global motion planning within unstructured environments. This system combines the concept of co-evolutionary search along with a concept that we refer to as the visibility-based repair to form a hybrid which quickly transforms infeasible motions into feasible ones. Also, this system makes use of a novel representation scheme for the obstacles within an environment. Our hybrid evolutionary system differs from other evolutionary motion planners in that (1) more emphasis is placed on repairing infeasible motions to develop feasible motions rather than using simulated evolution exclusively as a means of discovering feasible motions, (2) a continuous map of the environment is used rather than a discretized map, and (3) it develops global motion plans for multiple mobile destinations by co-evolving populations of sub-global motion plans. In this paper, we demonstrate the effectiveness of this system by using it to solve two challenging motion planning problems where multiple targets try to move away from a point robot.
Integrated assessment of urban drainage system under the framework of uncertainty analysis.
Dong, X; Chen, J; Zeng, S; Zhao, D
2008-01-01
Due to a rapid urbanization as well as the presence of large number of aging urban infrastructures in China, the urban drainage system is facing a dual pressure of construction and renovation nationwide. This leads to the need for an integrated assessment when an urban drainage system is under planning or re-design. In this paper, an integrated assessment methodology is proposed based upon the approaches of analytic hierarchy process (AHP), uncertainty analysis, mathematical simulation of urban drainage system and fuzzy assessment. To illustrate this methodology, a case study in Shenzhen City of south China has been implemented to evaluate and compare two different urban drainage system renovation plans, i.e., the distributed plan and the centralized plan. By comparing their water quality impacts, ecological impacts, technological feasibility and economic costs, the integrated performance of the distributed plan is found to be both better and robust. The proposed methodology is also found to be both effective and practical. (c) IWA Publishing 2008.
Nkengasong, John N; Mesele, Tsehaynesh; Orloff, Sherry; Kebede, Yenew; Fonjungo, Peter N; Timperi, Ralph; Birx, Deborah
2009-06-01
Medical laboratory services are an essential, yet often neglected, component of health systems in developing countries. Their central role in public health, disease control and surveillance, and patient management is often poorly recognized by governments and donors. However, medical laboratory services in developing countries can be strengthened by leveraging funding from other sources of HIV/AIDS prevention, care, surveillance, and treatment programs. Strengthening these services will require coordinated efforts by national governments and partners and can be achieved by establishing and implementing national laboratory strategic plans and policies that integrate laboratory systems to combat major infectious diseases. These plans should take into account policy, legal, and regulatory frameworks; the administrative and technical management structure of the laboratories; human resources and retention strategies; laboratory quality management systems; monitoring and evaluation systems; procurement and maintenance of equipment; and laboratory infrastructure enhancement. Several countries have developed or are in the process of developing their laboratory plans, and others, such as Ethiopia, have implemented and evaluated their plan.
Technical aspects of virtual liver resection planning.
Glombitza, G; Lamadé, W; Demiris, A M; Göpfert, M R; Mayer, A; Bahner, M L; Meinzer, H P; Richter, G; Lehnert, T; Herfarth, C
1998-01-01
Operability of a liver tumor is depending on its three dimensional relation to the intrahepatic vascular trees which define autonomously functioning liver (sub-)segments. Precise operation planning is complicated by anatomic variability, distortion of the vascular trees by the tumor or preceding liver resections. Because of the missing possibility to track the deformation of the liver during the operation an integration of the resection planning system into an intra-operative navigation system is not feasible. So the main task of an operation planning system in this domain is a quantifiable patient selection by exact prediction of post-operative liver function and a quantifiable resection proposal. The system quantifies the organ structures and resection volumes by means of absolute and relative values. It defines resection planes depending on security margins and the vascular trees and presents the data in visualized form as a 3D movie. The new 3D operation planning system offers quantifiable liver resection proposals based on individualized liver anatomy. The results are visualized in digital movies as well as in quantitative reports.
University of West Florida Work Plan, 2013-2014
ERIC Educational Resources Information Center
Board of Governors, State University System of Florida, 2013
2013-01-01
The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…
The importance of management information systems in a managed care environment.
Porro, M R; Brill, K R
1995-06-01
Keys to successful information systems for home care providers are planning and control. With managed care's emphasis on data, agencies need to have information systems that can handle the demands managed care puts on agencies today--planning before hurrying to install a system will ensure control as the managed care contracts add up.
Choosing a Digital Asset Management System That's Right for You
ERIC Educational Resources Information Center
Kaplan, Deborah
2009-01-01
Planning is necessary in selecting the appropriate digital asset management system for your institution. Key issues one should consider in planning: the objects to be stored, where they come from, and how they will be accessed; the end users; and the needed staffing levels for system maintenance. During the development of the system requirements,…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... Promulgation of Air Quality Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental..., 2001, and August 16, 2007, that create and amend the System Cap Trading (SCT) Program at Title 30 of.... What action is EPA proposing? II. What did Texas submit? III. What is the System Cap Trading Program...
NASA Technical Reports Server (NTRS)
Niebur, Dagmar
1995-01-01
Electric power systems represent complex systems involving many electrical components whoseoperation has to be planned, analyzed, monitored and controlled. The time-scale of tasks in electricpower systems extends from long term planning years ahead to milliseconds in the area of control. The behavior of power systems is highly non-linear. Monitoring and control involves several hundred variables which are only partly available by measurements.
1991-07-30
4 Management reviews, engineering and WBS -Spiral 0 -5 *Risk Management Planning -Spiral 0-5 ,41.- Unrelsi ugt .Proper initial planning -Spiral 0.1...Reusability issues for trusted systems are associated closely with maintenance issues. Reuse theory and practice for highly trusted systems will require
Optimized production planning model for a multi-plant cultivation system under uncertainty
NASA Astrophysics Data System (ADS)
Ke, Shunkui; Guo, Doudou; Niu, Qingliang; Huang, Danfeng
2015-02-01
An inexact multi-constraint programming model under uncertainty was developed by incorporating a production plan algorithm into the crop production optimization framework under the multi-plant collaborative cultivation system. In the production plan, orders from the customers are assigned to a suitable plant under the constraints of plant capabilities and uncertainty parameters to maximize profit and achieve customer satisfaction. The developed model and solution method were applied to a case study of a multi-plant collaborative cultivation system to verify its applicability. As determined in the case analysis involving different orders from customers, the period of plant production planning and the interval between orders can significantly affect system benefits. Through the analysis of uncertain parameters, reliable and practical decisions can be generated using the suggested model of a multi-plant collaborative cultivation system.
NASA Technical Reports Server (NTRS)
Adair, Jerry R.
1994-01-01
This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.
Dosimetric evaluation of total marrow irradiation using 2 different planning systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nalichowski, Adrian, E-mail: nalichoa@karmanos.org; Eagle, Don G.; Burmeister, Jay
This study compared 2 different treatment planning systems (TPSs) for quality and efficiency of total marrow irradiation (TMI) plans. The TPSs used in this study were VOxel-Less Optimization (VoLO) (Accuray Inc, Sunnyvale, CA) using helical dose delivery on a Tomotherapy Hi-Art treatment unit and Eclipse (Varian Medical Systems Inc, Palo Alto, CA) using volumetric modulated arc therapy (VMAT) dose delivery on a Varian iX treatment unit. A total dose of 1200 cGy was prescribed to cover 95% of the planning target volume (PTV). The plans were optimized and calculated based on a single CT data and structure set using themore » Alderson Rando phantom (The Phantom Laboratory, Salem, NY) and physician contoured target and organ at risk (OAR) volumes. The OARs were lungs, heart, liver, kidneys, brain, and small bowel. The plans were evaluated based on plan quality, time to optimize the plan and calculate the dose, and beam on time. The resulting mean and maximum doses to the PTV were 1268 and 1465 cGy for VoLO and 1284 and 1541 cGy for Eclipse, respectively. For 5 of 6 OAR structures the VoLO system achieved lower mean and D10 doses ranging from 22% to 52% and 3% to 44%, respectively. Total computational time including only optimization and dose calculation were 0.9 hours for VoLO and 3.8 hours for Eclipse. These times do not include user-dependent target delineation and field setup. Both planning systems are capable of creating high-quality plans for total marrow irradiation. The VoLO planning system was able to achieve more uniform dose distribution throughout the target volume and steeper dose fall off, resulting in superior OAR sparing. VoLO's graphics processing unit (GPU)–based optimization and dose calculation algorithm also allowed much faster creation of TMI plans.« less
Wang, Huixiang; Wang, Fang; Newman, Simon; Lin, Yanping; Chen, Xiaojun; Xu, Lu; Wang, Qiugen
2016-08-01
Acetabular fracture surgery is amongst the most challenging tasks in the field of trauma surgery and careful preoperative planning is crucial for success. The aim of this paper is to describe the preliminary outcome of the utilization of an innovative computerized virtual planning system for acetabular fractures. 3D models of acetabular fractures and surrounding soft tissues from six patients were constructed from preoperative CT scans. A novel highly-automatic segmentation technique was performed on the 3D model to separate each fracture fragment, then 3D virtual reduction was performed. Additionally, the models were used to assess potential surgical approaches with reference to both the fracture and the surrounding soft tissues. The time required for virtual planning was recorded. After surgery, the virtual plan was compared to the real surgery with respect to surgical approach and reduction sequence. A Likert scale questionnaire was completed by the surgeons to evaluate their satisfaction with the system. Virtual planning was successfully completed in all cases. The planned surgical approach was followed in all cases with the planned reduction sequence followed completely in five cases and partially in one. The mean time required for virtual planning was 38.7min (range 21-57, SD=15.5). The mean time required for planning of B-type fractures was 25.0min (range 21-30, SD=4.6), of C-type fracture 52.3min (range 49-57, SD=4.2). The results of the questionnaire demonstrated a high level of satisfaction with the planning system. This study demonstrates that the virtual planning system is feasible in clinical settings with high satisfaction and acceptability from the surgeons. It provides a viable option for the planning of acetabular fracture surgery. Copyright © 2016 Elsevier Ltd. All rights reserved.
USDOT’s Intelligent Transportation Systems (ITS) ITS strategic plan, 2015-2019.
DOT National Transportation Integrated Search
2014-05-01
This document constitutes the Intelligent Transportation Systems Strategic Plan covering the years 2015 to 2019; it builds on the progress of the 2010-2014 plan and presents a wide array of technical, policy, institutional, and organizational concept...
DOT National Transportation Integrated Search
2010-09-13
Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...
36 CFR 219.4 - Identification and consideration of issues.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning The Framework for Planning... interested in or affected by National Forest System management; Presidential, Departmental, and Forest Service conservation leadership initiatives; cooperatively developed landscape goals (§ 219.12(b...
2014-06-01
21 C . CMMS USE IN THE LCS PROGRAM ......................................................22 D. CBM+ MAINTENANCE MANAGEMENT SYSTEM...45 b. Plan Maintenance Budgeting .................................................45 c . Plan Maintenance Logistics... Maintenance Planning ...................................46 b. Communicate Maintenance Budget .......................................46 c . Communicate
48 CFR 307.7104 - Review and certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Review and certification. 307.7104 Section 307.7104 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7104 Review and certification...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 7.202 Section 7.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Planning for the Purchase of Supplies in Economic Quantities 7.202 Policy. (a) Agencies...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Policy. 7.202 Section 7.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING ACQUISITION PLANNING Planning for the Purchase of Supplies in Economic Quantities 7.202 Policy. (a) Agencies...
46 CFR 107.305 - Plans and information.
Code of Federal Regulations, 2013 CFR
2013-10-01
... systems. Marine Engineering (z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter. Electrical Engineering (aa) Plans required for electrical engineering equipment... materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and...
48 CFR 307.7104 - Review and certification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Review and certification. 307.7104 Section 307.7104 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7104 Review and certification...
48 CFR 307.7104 - Review and certification.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Review and certification. 307.7104 Section 307.7104 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7104 Review and certification...
48 CFR 307.7104 - Review and certification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Review and certification. 307.7104 Section 307.7104 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7104 Review and certification...
48 CFR 307.7104 - Review and certification.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Review and certification. 307.7104 Section 307.7104 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7104 Review and certification...
DOT National Transportation Integrated Search
2001-10-01
This document is the third in a series of five that present the sequential results of the Thurston Regional Planning Council (TRPC) Regional Intelligent Transportation Systems (ITS) : Planning Project. This document presents an ITS Strategic Depl...
Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan
DOT National Transportation Integrated Search
1977-01-01
The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...
Highway planning and operations for the Dallas district : freeway system plan methodology : summary
DOT National Transportation Integrated Search
1997-11-01
The System Planning Methodology was developed jointly by the Texas Department of Transportation (TxDOT), North Central Texas Council of Governments (NCTCOG), Dallas Area Rapid Transit (DART), and Texas Transportation Institute (TTI) as a transportati...
Louisiana Airport System Plan Five-Year Capital Improvement Program.
DOT National Transportation Integrated Search
1992-07-01
The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...
The Feasibility of Instituting a Department Head Screen in the Naval Special Warfare Community.
1985-12-01
community, and through use of the Structured Accession Planning System for Officers (STRAP-O) model, projects the community from 1985 to 1991 both with and...Placement Officer. It looks at the current state of the NSW community, and through use of the Structured Accession Planning System for Officers (STRAP-0...ACCESSION PLANNING SYSTEM FOR OFFICERS----------------------------------------19 Ill. NAVAL SPECIAL WARFARE COMMUNITY RESPONSE TO PROPOSAL
NASA Technical Reports Server (NTRS)
Schoppers, Marcel
1994-01-01
The design of a flexible, real-time software architecture for trajectory planning and automatic control of redundant manipulators is described. Emphasis is placed on a technique of designing control systems that are both flexible and robust yet have good real-time performance. The solution presented involves an artificial intelligence algorithm that dynamically reprograms the real-time control system while planning system behavior.
Code of Federal Regulations, 2011 CFR
2011-04-01
... employee or any of his dependents under a plan or system established by an employer which makes provision... of his dependents. (b) The plan or system established by an employer need not provide for payments on account of all of the specified items, but such plan or system may provide for any one or more of such...
Code of Federal Regulations, 2012 CFR
2012-04-01
... employee or any of his dependents under a plan or system established by an employer which makes provision... of his dependents. (b) The plan or system established by an employer need not provide for payments on account of all of the specified items, but such plan or system may provide for any one or more of such...
Code of Federal Regulations, 2013 CFR
2013-04-01
... employee or any of his dependents under a plan or system established by an employer which makes provision... of his dependents. (b) The plan or system established by an employer need not provide for payments on account of all of the specified items, but such plan or system may provide for any one or more of such...
Code of Federal Regulations, 2014 CFR
2014-04-01
... employee or any of his dependents under a plan or system established by an employer which makes provision... of his dependents. (b) The plan or system established by an employer need not provide for payments on account of all of the specified items, but such plan or system may provide for any one or more of such...
NASA Technical Reports Server (NTRS)
1975-01-01
The organization, objectives, and accomplishments of the panel on Land Use Planning are reported. Technology developments, and projected developments are discussed along with anticipated information requirements. The issues for users, recommended remote sensing programs, and space systems are presented. It was found that remote sensing systems are useful in future land use planning. It is recommended that a change detection system for monitoring land use and critical environmental areas be developed by 1979.
Code of Federal Regulations, 2012 CFR
2012-04-01
... that the parties involved in carrying out the planning, programming and management systems processes... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS Federal-aid Highway Systems § 470.103 Definitions. Except as otherwise provided in this part, terms defined in 23 U.S...
DOT National Transportation Integrated Search
2012-08-31
The purpose of this study was to (1) study the potential expansion of existing alternative transportation systems (bicycle facilities) and development of new alternative transportation systems in and around the Maryland District of Assateague Island ...
46 CFR 62.20-3 - Plans for information.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-based system hardware. (3) Safety controls. (4) Automated electric power management. (5) Automation... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Plan... Officer in Charge, Marine Inspection, for use in the evaluation of automated systems provided to replace...
Strategic Information Systems Planning.
ERIC Educational Resources Information Center
Rowley, Jennifer
1995-01-01
Strategic Information Systems Planning (SISP) is the process of establishing a program for implementation and use of information systems in ways that will optimize effectiveness of information resources and use them to support the objectives of the organization. Basic steps in SISP methodology are outlined. (JKP)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E&E-APD); Use: Under... Eligibility/Enrollment Systems APD approval assignment. The information requested on the Checklist will be... an Expedited Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E& -APD...
Approaches to Legacy System Evolution.
1997-12-01
such as migrating legacy systems, to more distributed open environments. This framework draws out the important global issues early in the planning...ongoing system evolution initiatives, for drawing out important global issues early in the planning cycle using the checklists as a guide, and for
Kernel-based Linux emulation for Plan 9.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Minnich, Ronald G.
2010-09-01
CNKemu is a kernel-based system for the 9k variant of the Plan 9 kernel. It is designed to provide transparent binary support for programs compiled for IBM's Compute Node Kernel (CNK) on the Blue Gene series of supercomputers. This support allows users to build applications with the standard Blue Gene toolchain, including C++ and Fortran compilers. While the CNK is not Linux, IBM designed the CNK so that the user interface has much in common with the Linux 2.0 system call interface. The Plan 9 CNK emulator hence provides the foundation of kernel-based Linux system call support on Plan 9.more » In this paper we discuss cnkemu's implementation and some of its more interesting features, such as the ability to easily intermix Plan 9 and Linux system calls.« less
Biondo, Patricia D; Lee, Lydia D; Davison, Sara N; Simon, Jessica E
2016-09-01
Advance care planning initiatives are being implemented across healthcare systems around the world, but how best to evaluate their implementation is unknown. To identify gaps and/or redundancies in current evaluative strategies to help healthcare systems develop future evaluative frameworks for ACP. Systematic review. Peer-reviewed and gray literature searches were conducted till February 2015 to answer: "What methods have healthcare systems used to evaluate implementation of advance care planning initiatives?" A PICOS framework was developed to identify articles describing the implementation and evaluation of a health system-level advance care planning initiative. Outcome measures were mapped onto a conceptual quality indicator framework based on the Institute of Medicine and Donabedian models of healthcare quality. A total of 46 studies met inclusion criteria for analysis. Most articles reported on single parts of a healthcare system (e.g. continuing care). The most common outcome measures pertained to document completion, followed by healthcare resource use. Patient-, family-, or healthcare provider-reported outcomes were less commonly measured. Concordance measures (e.g. dying in place of choice) were reported by only 26% of studies. The conceptual quality indicator framework identified gaps and redundancies in measurement and is presented as a potential foundation from which to develop a comprehensive advance care planning evaluation framework. Document completion is frequently used to evaluate advance care planning program implementation; capturing the quality of care appears to be more difficult. This systematic review provides health system administrators with a comprehensive summary of measures used to evaluate advance care planning and may identify gaps in evaluation within their local context. © The Author(s) 2016.
Interactive orbital proximity operations planning system
NASA Technical Reports Server (NTRS)
Grunwald, Arthur J.; Ellis, Stephen R.
1990-01-01
An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.
Optimum-AIV: A planning and scheduling system for spacecraft AIV
NASA Technical Reports Server (NTRS)
Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.
1991-01-01
A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.
A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning
NASA Astrophysics Data System (ADS)
Basdekas, L.; Stewart, N.; Triana, E.
2013-12-01
Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU evaluate tradeoffs in a continually changing world.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liu, X; Yin, Y; Lin, X
Purpose: To assess the preliminary feasibility of automated treatment planning verification system in cervical cancer IMRT pre-treatment dose verification. Methods: The study selected randomly clinical IMRT treatment planning data for twenty patients with cervical cancer, all IMRT plans were divided into 7 fields to meet the dosimetric goals using a commercial treatment planning system(PianncleVersion 9.2and the EclipseVersion 13.5). The plans were exported to the Mobius 3D (M3D)server percentage differences of volume of a region of interest (ROI) and dose calculation of target region and organ at risk were evaluated, in order to validate the accuracy automated treatment planning verification system.more » Results: The difference of volume for Pinnacle to M3D was less than results for Eclipse to M3D in ROI, the biggest difference was 0.22± 0.69%, 3.5±1.89% for Pinnacle and Eclipse respectively. M3D showed slightly better agreement in dose of target and organ at risk compared with TPS. But after recalculating plans by M3D, dose difference for Pinnacle was less than Eclipse on average, results were within 3%. Conclusion: The method of utilizing the automated treatment planning system to validate the accuracy of plans is convenientbut the scope of differences still need more clinical patient cases to determine. At present, it should be used as a secondary check tool to improve safety in the clinical treatment planning.« less
Agent independent task planning
NASA Technical Reports Server (NTRS)
Davis, William S.
1990-01-01
Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.
Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India
Samal, Janmejaya
2015-01-01
AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1st5-year plan. A progressive path of development could be observed since the first to the 12th5-year plan. It was up to the 7thplan the growth was little sluggish and from 8thplan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11th5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of “Mainstreaming of AYUSH and revitalization of local health traditions” to strengthen public health services. This scheme is currently in operation in its second phase, since 1stApril 2012, with the 12th5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1stplan to 12thplan, to enable reflection and throw some light into the future directions of AYUSH system. PMID:26649240
Edwards, M.D.
1987-01-01
The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)
Planning Study for Low Speed Damage Reduction Systems
DOT National Transportation Integrated Search
1977-06-01
This report documents the planning study intended to provide the basis from which a comprehensive study of low speed damage systems may be conducted. This planning study and the comprehensive study are in response to Title I of the Motor Vehicle Info...
Opportunities for energy conservation in transportation planning and systems management.
DOT National Transportation Integrated Search
1978-01-01
This report is a summary, based primarily on a literature review, of the energy-savings potential of the elements in the transportation planning process and systems management. Within the scope of long-range planning, the energy aspects of land use a...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Content. 307.7102 Section 307.7102 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7102 Content. In accordance with 307.105, the FAR, HHSAR...
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2807.102 Section 2807.102 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 2807.102 Policy. (a)(1) In accordance with FAR 7.1, DOJ...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2807.102 Section 2807.102 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plans 2807.102 Policy. (a)(1) In accordance with FAR 7.1, DOJ...
Setting Strategic Directions Using Critical Success Factors.
ERIC Educational Resources Information Center
Bourne, Bonnie; Gates, Larry; Cofer, James
2000-01-01
Describes implementation of a system-level planning model focused on institutional improvement and effectiveness at the University of Missouri. Details implementation of three phases of the strategic planning model (strategic analysis, strategic thinking/decision-making, and campus outreach/systems administration planning); identifies critical…
Wind Shear radar program future plans
NASA Technical Reports Server (NTRS)
Robertson, Roy E.
1991-01-01
The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.
48 CFR 2919.704 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...
48 CFR 1519.705-4 - Reviewing the subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...
National ITS Program Plan, Intelligent Transportation Systems, Synopsis
DOT National Transportation Integrated Search
THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
The influence of enterprise resource planning (ERP) systems' performance on earnings management
NASA Astrophysics Data System (ADS)
Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei
2012-11-01
We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.
Computer-Assisted School Facility Planning with ONPASS.
ERIC Educational Resources Information Center
Urban Decision Systems, Inc., Los Angeles, CA.
The analytical capabilities of ONPASS, an on-line computer-aided school facility planning system, are described by its developers. This report describes how, using the Canoga Park-Winnetka-Woodland Hills Planning Area as a test case, the Department of City Planning of the city of Los Angeles employed ONPASS to demonstrate how an on-line system can…
Creating a University for the 21st Century: Strategic Plan
ERIC Educational Resources Information Center
North Dakota University System, 2005
2005-01-01
This document presents the strategic plan of the North Dakota University System, revised in November 2005, to develop a common vision and clear set of expectations for higher education in North Dakota. The strategic plan for the University System is directly linked to the Roundtable on Higher Education plan. This document presents the ten sections…
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.
1993-01-01
In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.
Constraint Maintenance with Preferences and Underlying Flexible Solution
NASA Technical Reports Server (NTRS)
Bresina, John; Jonsson, Ari; Morris, Paul; Rajan, Kanna
2003-01-01
This paper describes an aspect of the constraint reasoning mechanism. that is part of a ground planning system slated to be used for the Mars Exploration Rovers mission, where two rovers are scheduled to land on Mars in January of 2003. The planning system combines manual planning software from JPL with an automatic planning/scheduling system from NASA Ames Research Center, and is designed to be used in a mixed-initiative mode. Among other things, this means that after a plan has been produced, the human operator can perform extensive modifications under the supervision of the automated. system. For each modification to an activity, the automated system must adjust other activities as needed to ensure that constraints continue to be satisfied. Thus, the system must accommodate change in an interactive setting. Performance is of critical importance for interactive use. This is achieved by maintaining an underlying flexible solution to the temporal constraints, while the system presents a fixed schedule to the user. Adjustments are then a matter of constraint propagation rather than completely re-solving the problem. However, this begs the important question of which fixed schedule (among the ones sanctioned by the underlying flexible solution) should be presented to the user.Our approach uses least-change and other preferences as a prism through which the user views the flexible solution.
Spanholtz, T A; Leitsch, S; Holzbach, T; Volkmer, E; Engelhardt, T; Giunta, R E
2012-08-01
A reproducible 3-dimensional photographic system enables plastic surgeons to perform preoperative planning and helps them to understand the patient's expectations. There are a few systems available that allow a reproducible 3-dimensional scans of the patient with direct simulation of the planned procedure. The Vectra Volumetric 3D Surface Imaging® by Canfield® provides such an option and helps the surgeons to document and compare postoperative changes at different time points. Since January 2011 we are digitally documenting all patients receiving form-modulating procedures in our plastic surgery unit. We present the spectrum of clinical implications and discuss advantages and disadvantages of the system. Furthermore, we have studied the accuracy of the system in comparison to direct measurement in 15 volunteers. The system is especially suited for planning and evaluation of breast augmentation, facial aesthetic and reconstructive surgery as well as volumetric measurements before and after liposuction and lipofilling. Computer-assisted measurements correlate with a median deviation of 2.3% with manually measured distances in the face. We found the user-friendly Vectra® system to be a reliable and reproducible device for planning plastic surgery therapies and for documenting postoperative results. © Georg Thieme Verlag KG Stuttgart · New York.
Healthcare information systems: data mining methods in the creation of a clinical recommender system
NASA Astrophysics Data System (ADS)
Duan, L.; Street, W. N.; Xu, E.
2011-05-01
Recommender systems have been extensively studied to present items, such as movies, music and books that are likely of interest to the user. Researchers have indicated that integrated medical information systems are becoming an essential part of the modern healthcare systems. Such systems have evolved to an integrated enterprise-wide system. In particular, such systems are considered as a type of enterprise information systems or ERP system addressing healthcare industry sector needs. As part of efforts, nursing care plan recommender systems can provide clinical decision support, nursing education, clinical quality control, and serve as a complement to existing practice guidelines. We propose to use correlations among nursing diagnoses, outcomes and interventions to create a recommender system for constructing nursing care plans. In the current study, we used nursing diagnosis data to develop the methodology. Our system utilises a prefix-tree structure common in itemset mining to construct a ranked list of suggested care plan items based on previously-entered items. Unlike common commercial systems, our system makes sequential recommendations based on user interaction, modifying a ranked list of suggested items at each step in care plan construction. We rank items based on traditional association-rule measures such as support and confidence, as well as a novel measure that anticipates which selections might improve the quality of future rankings. Since the multi-step nature of our recommendations presents problems for traditional evaluation measures, we also present a new evaluation method based on average ranking position and use it to test the effectiveness of different recommendation strategies.
Power system restoration - A task force report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adibi, M.; Clelland, P.; Fink, L.
1986-01-01
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under. The body of the report consists of notes prepared by members of the Task Force. It should not be interred that a complete reporting on Power System Restoration is undertaken here. The intent is to report upon work of the Task Force to date. The report also reviews several different restoration plans and shows their common concerns and constraints.« less
Identification of high-level functional/system requirements for future civil transports
NASA Technical Reports Server (NTRS)
Swink, Jay R.; Goins, Richard T.
1992-01-01
In order to accommodate the rapid growth in commercial aviation throughout the remainder of this century, the Federal Aviation Administration (FAA) is faced with a formidable challenge to upgrade and/or modernize the National Airspace System (NAS) without compromising safety or efficiency. A recurring theme in both the Aviation System Capital Investment Plan (CIP), which has replaced the NAS Plan, and the new FAA Plan for Research, Engineering, and Development (RE&D) rely on the application of new technologies and a greater use of automation. Identifying the high-level functional and system impacts of such modernization efforts on future civil transport operational requirements, particularly in terms of cockpit functionality and information transfer, was the primary objective of this project. The FAA planning documents for the NAS of the 2005 era and beyond were surveyed; major aircraft functional capabilities and system components required for such an operating environment were identified. A hierarchical structured analysis of the information processing and flows emanating from such functional/system components were conducted and the results documented in graphical form depicting the relationships between functions and systems.
Image formation simulation for computer-aided inspection planning of machine vision systems
NASA Astrophysics Data System (ADS)
Irgenfried, Stephan; Bergmann, Stephan; Mohammadikaji, Mahsa; Beyerer, Jürgen; Dachsbacher, Carsten; Wörn, Heinz
2017-06-01
In this work, a simulation toolset for Computer Aided Inspection Planning (CAIP) of systems for automated optical inspection (AOI) is presented along with a versatile two-robot-setup for verification of simulation and system planning results. The toolset helps to narrow down the large design space of optical inspection systems in interaction with a system expert. The image formation taking place in optical inspection systems is simulated using GPU-based real time graphics and high quality off-line-rendering. The simulation pipeline allows a stepwise optimization of the system, from fast evaluation of surface patch visibility based on real time graphics up to evaluation of image processing results based on off-line global illumination calculation. A focus of this work is on the dependency of simulation quality on measuring, modeling and parameterizing the optical surface properties of the object to be inspected. The applicability to real world problems is demonstrated by taking the example of planning a 3D laser scanner application. Qualitative and quantitative comparison results of synthetic and real images are presented.
A Case Study of the United States Navy’s Enterprise Resource Planning System
2006-06-01
incarnations, MRP-II added the capabilities of shop-floor management and distribution management activities. Later versions included the ability to manage ... finances , human resources, engineering, and project management. Enterprise Resource Planning systems were then developed as an integrated system
DOT National Transportation Integrated Search
1997-01-01
Prepared ca. 1997. The Configuration Management Plan (CMP) provides configuration management instructions and guidance for the Vessel Traffic Service (VTS) system of the Ports and Waterways Safety System (PAWSS) project. The CMP describes in detail t...
Computer Disaster Recovery Planning.
ERIC Educational Resources Information Center
Clark, Orvin R.
Arguing that complete, reliable, up-to-date system documentation is critical for every data processing environment, this paper on computer disaster recovery planning begins by discussing the importance of such documentation both for recovering from a systems crash, and for system maintenance and enhancement. The various components of system…
DOT National Transportation Integrated Search
1997-11-01
The ITS Strategic Plan outlines a strategy for improving the efficiency of the Capitol Regions existing highway and transit systems. The Regions overall goal is to improve the efficiency and effectiveness of existing systems so as to reduce the...
75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...
Enhancing Evacuation Plans with a Situation Awareness System Based on End-User Knowledge Provision
Morales, Augusto; Alcarria, Ramon; Martin, Diego; Robles, Tomas
2014-01-01
Recent disasters have shown that having clearly defined preventive procedures and decisions is a critical component that minimizes evacuation hazards and ensures a rapid and successful evolution of evacuation plans. In this context, we present our Situation-Aware System for enhancing Evacuation Plans (SASEP) system, which allows creating end-user business rules that technically support the specific events, conditions and actions related to evacuation plans. An experimental validation was carried out where 32 people faced a simulated emergency situation, 16 of them using SASEP and the other 16 using a legacy system based on static signs. From the results obtained, we compare both techniques and discuss in which situations SASEP offers a better evacuation route option, confirming that it is highly valuable when there is a threat in the evacuation route. In addition, a study about user satisfaction using both systems is presented showing in which cases the systems are assessed as satisfactory, relevant and not frustrating. PMID:24961212
Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter
2009-11-01
This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.
Enhancing evacuation plans with a situation awareness system based on end-user knowledge provision.
Morales, Augusto; Alcarria, Ramon; Martin, Diego; Robles, Tomas
2014-06-24
Recent disasters have shown that having clearly defined preventive procedures and decisions is a critical component that minimizes evacuation hazards and ensures a rapid and successful evolution of evacuation plans. In this context, we present our Situation-Aware System for enhancing Evacuation Plans (SASEP) system, which allows creating end-user business rules that technically support the specific events, conditions and actions related to evacuation plans. An experimental validation was carried out where 32 people faced a simulated emergency situation, 16 of them using SASEP and the other 16 using a legacy system based on static signs. From the results obtained, we compare both techniques and discuss in which situations SASEP offers a better evacuation route option, confirming that it is highly valuable when there is a threat in the evacuation route. In addition, a study about user satisfaction using both systems is presented showing in which cases the systems are assessed as satisfactory, relevant and not frustrating.
Nursing in the information age: status quo and future of ICT use in German hospitals.
Hübner, Ursula; Sellemann, Björn
2004-01-01
Hospital information systems (HIS) should give support to nurses in their clinical and managerial duties. Though there are statistical data on the current use of HIS systems we know only little about the numbers of nursing modules implemented. We therefore conducted a nationwide survey in Germany (n = 2182) on the current state and future plans of HIS modules including nursing applications (response rate of 27.6 %). The findings show that management applications (84 % accounting) are still more frequent than clinical applications, in particular clinical patient record systems (19 %). What applied for HIS modules in general held also true for nursing on a lower level. Whereas 51 % of the hospitals had rostering systems in place only 6 % used care planning software. Priorities and plans for the future reveal no change in the rank order of systems. We argue that in order for clinical documentation and planning systems to catch up they must be immediately rewarding for the clinicians in their daily need for information
Dosimetric verification of IMRT treatment planning using Monte Carlo simulations for prostate cancer
NASA Astrophysics Data System (ADS)
Yang, J.; Li, J.; Chen, L.; Price, R.; McNeeley, S.; Qin, L.; Wang, L.; Xiong, W.; Ma, C.-M.
2005-03-01
The purpose of this work is to investigate the accuracy of dose calculation of a commercial treatment planning system (Corvus, Normos Corp., Sewickley, PA). In this study, 30 prostate intensity-modulated radiotherapy (IMRT) treatment plans from the commercial treatment planning system were recalculated using the Monte Carlo method. Dose-volume histograms and isodose distributions were compared. Other quantities such as minimum dose to the target (Dmin), the dose received by 98% of the target volume (D98), dose at the isocentre (Diso), mean target dose (Dmean) and the maximum critical structure dose (Dmax) were also evaluated based on our clinical criteria. For coplanar plans, the dose differences between Monte Carlo and the commercial treatment planning system with and without heterogeneity correction were not significant. The differences in the isocentre dose between the commercial treatment planning system and Monte Carlo simulations were less than 3% for all coplanar cases. The differences on D98 were less than 2% on average. The differences in the mean dose to the target between the commercial system and Monte Carlo results were within 3%. The differences in the maximum bladder dose were within 3% for most cases. The maximum dose differences for the rectum were less than 4% for all the cases. For non-coplanar plans, the difference in the minimum target dose between the treatment planning system and Monte Carlo calculations was up to 9% if the heterogeneity correction was not applied in Corvus. This was caused by the excessive attenuation of the non-coplanar beams by the femurs. When the heterogeneity correction was applied in Corvus, the differences were reduced significantly. These results suggest that heterogeneity correction should be used in dose calculation for prostate cancer with non-coplanar beam arrangements.
Kishan, Amar U; Cao, Minsong; Mikaeilian, Argin G; Low, Daniel A; Kupelian, Patrick A; Steinberg, Michael L; Kamrava, Mitchell
2015-01-01
The purpose of this study was to investigate the dosimetric differences of delivering preoperative intensity modulated radiation therapy (IMRT) to patients with soft tissue sarcomas of the extremity (ESTS) with a teletherapy system equipped with 3 rotating (60)Co sources and a built-in magnetic resonance imaging and with standard linear accelerator (LINAC)-based IMRT. The primary study population consisted of 9 patients treated with preoperative radiation for ESTS between 2008 and 2014 with LINAC-based static field IMRT. LINAC plans were designed to deliver 50 Gy in 25 fractions to 95% of the planning target volume (PTV). Tri-(60)Co system IMRT plans were designed with ViewRay system software. Tri-(60)Co-based IMRT plans achieved equivalent target coverage and dosimetry for organs at risk (long bone, skin, and skin corridor) compared with LINAC-based IMRT plans. The maximum and minimum PTV doses, heterogeneity indices, and ratio of the dose to 50% of the volume were equivalent for both planning systems. One LINAC plan violated the maximum bone dose constraint, whereas none of the tri-(60)Co plans did. Using a tri-(60)Co system, we were able to achieve equivalent dosimetry to the PTV and organs at risk for patients with ESTS compared with LINAC-based IMRT plans. The tri-(60)Co system may be advantageous over current treatment platforms by allowing PTV reduction and by elimination of the additional radiation dose associated with daily image guidance, but this needs to be evaluated prospectively. Copyright © 2015 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.
De Martin, Elena; Duran, Dunja; Ghielmetti, Francesco; Visani, Elisa; Aquino, Domenico; Marchetti, Marcello; Sebastiano, Davide Rossi; Cusumano, Davide; Bruzzone, Maria Grazia; Panzica, Ferruccio; Fariselli, Laura
2017-12-01
Magnetoencephalography (MEG) and functional magnetic resonance imaging (fMRI) provide noninvasive localization of eloquent brain areas for presurgical planning. The aim of this study is the integration of MEG and fMRI maps into a CyberKnife (CK) system to optimize dose planning. Four patients with brain metastases in the motor area underwent functional imaging study of the hand motor cortex before radiosurgery. MEG data were acquired during a visually cued hand motor task. Motor activations were identified also using an fMRI block-designed paradigm. MEG and fMRI maps were then integrated into a CK system and contoured as organs at risk for treatment planning optimization. The integration of fMRI data into the CK system was achieved for all patients by means of a standardized protocol. We also implemented an ad hoc pipeline to convert the MEG signal into a DICOM standard, to make sure that it was readable by our CK treatment planning system. Inclusion of the activation areas into the optimization plan allowed the creation of treatment plans that reduced the irradiation of the motor cortex yet not affecting the brain peripheral dose. The availability of advanced neuroimaging techniques is playing an increasingly important role in radiosurgical planning strategy. We successfully imported MEG and fMRI activations into a CK system. This additional information can improve dose sparing of eloquent areas, allowing a more comprehensive investigation of the related dose-volume constraints that in theory could translate into a gain in tumor local control, and a reduction of neurological complications. Copyright © 2017 Elsevier Inc. All rights reserved.
SU-F-T-256: 4D IMRT Planning Using An Early Prototype GPU-Enabled Eclipse Workstation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hagan, A; Modiri, A; Sawant, A
Purpose: True 4D IMRT planning, based on simultaneous spatiotemporal optimization has been shown to significantly improve plan quality in lung radiotherapy. However, the high computational complexity associated with such planning represents a significant barrier to widespread clinical deployment. We introduce an early prototype GPU-enabled Eclipse workstation for inverse planning. To our knowledge, this is the first GPUintegrated Eclipse system demonstrating the potential for clinical translation of GPU computing on a major commercially-available TPS. Methods: The prototype system comprised of four NVIDIA Tesla K80 GPUs, with a maximum processing capability of 8.5 Tflops per K80 card. The system architecture consisted ofmore » three key modules: (i) a GPU-based inverse planning module using a highly-parallelizable, swarm intelligence-based global optimization algorithm, (ii) a GPU-based open-source b-spline deformable image registration module, Elastix, and (iii) a CUDA-based data management module. For evaluation, aperture fluence weights in an IMRT plan were optimized over 9 beams,166 apertures and 10 respiratory phases (14940 variables) for a lung cancer case (GTV = 95 cc, right lower lobe, 15 mm cranio-caudal motion). Sensitivity of the planning time and memory expense to parameter variations was quantified. Results: GPU-based inverse planning was significantly accelerated compared to its CPU counterpart (36 vs 488 min, for 10 phases, 10 search agents and 10 iterations). The optimized IMRT plan significantly improved OAR sparing compared to the original internal target volume (ITV)-based clinical plan, while maintaining prescribed tumor coverage. The dose-sparing improvements were: Esophagus Dmax 50%, Heart Dmax 42% and Spinal cord Dmax 25%. Conclusion: Our early prototype system demonstrates that through massive parallelization, computationally intense tasks such as 4D treatment planning can be accomplished in clinically feasible timeframes. With further optimization, such systems are expected to enable the eventual clinical translation of higher-dimensional and complex treatment planning strategies to significantly improve plan quality. This work was partially supported through research funding from National Institutes of Health (R01CA169102) and Varian Medical Systems, Palo Alto, CA, USA.« less
Planning for Multiagent Using ASP-Prolog
NASA Astrophysics Data System (ADS)
Son, Tran Cao; Pontelli, Enrico; Nguyen, Ngoc-Hieu
This paper presents an Answer Set Programming based approach to multiagent planning. The proposed methodology extends the action language \\cal B in [12] to represent and reason about plans with cooperative actions of an individual agent operating in a multiagent environment. This language is used to formalize multiagent planning problems and the notion of a joint plan for multiagent in the presence of cooperative actions. Finally, the paper presents a system for computing joint plans based on the ASP-Prolog system.
The impact of health plan delivery system organization on clinical quality and patient satisfaction.
Gillies, Robin R; Chenok, Kate Eresian; Shortell, Stephen M; Pawlson, Gregory; Wimbush, Julian J
2006-08-01
The purpose of this study was to examine the extent to which measures of health plan clinical performance and measures of patient perceptions of care are associated with health plan organizational characteristics, including the percentage of care provided based on a group or staff model delivery system, for-profit (tax) status, and affiliation with a national managed care firm. Data describing health plans on region, age of health plan, for-profit status, affiliation with a national managed care firm, percentage of Medicare business, total enrollment, ratio of primary care physicians to specialists, HMO penetration, and form of health care delivery system (e.g., IPA, network, mixed, staff, group) were obtained from InterStudy. Clinical performance measures for women's health screening rates, child and adolescent immunization rates, heart disease screening rates, diabetes screening rates, and smoking cessation were developed from HEDIS data. Measures of patient perceptions of care are obtained from CAHPS survey data submitted as Healthplan Employer Data and Information Set, Consumer Assessment of Health Plans 2.0 H. Multivariate regression cross-sectional analysis of 272 health plans was used to evaluate the relationship of health plan characteristics with measures of clinical performance and patient perceptions of care. The form of delivery system, measured by percent of care delivered by staff and group model systems, is significantly related (p < or = .05) with four of the five clinical performance indices but none of the three satisfaction performance indices. Other variables significantly associated with performance were being geographically located in the Northeast, having nonprofit status, and for patient satisfaction, not being part of a larger insurance company. These comparative results provide evidence suggesting that the type of delivery system used by health plans is related to many clinical performance measures but is not related to patient perceptions of care. These findings underscore the importance of the form of the delivery system and the need for further inquiry that examines the relationship between organizational form and performance.