Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
Model Special Education Manpower Information and Management System. Final Report.
ERIC Educational Resources Information Center
Gilles, Cynthia
The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…
Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
Safe teleradiology: information assurance as project planning methodology
NASA Astrophysics Data System (ADS)
Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2003-05-01
This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
Intelligent transportation systems business plan for Kentucky : final report.
DOT National Transportation Integrated Search
2001-09-01
This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...
Nuclear rocket propulsion technology - A joint NASA/DOE project
NASA Technical Reports Server (NTRS)
Clark, John S.
1991-01-01
NASA and the DOE have initiated critical technology development for nuclear rocket propulsion systems for SEI human and robotic missions to the moon and to Mars. The activities and project plan of the interagency project planning team in FY 1990 and 1991 are summarized. The project plan includes evolutionary technology development for both nuclear thermal and nuclear electric propulsion systems.
Optimum-AIV: A planning and scheduling system for spacecraft AIV
NASA Technical Reports Server (NTRS)
Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.
1991-01-01
A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.
DOT National Transportation Integrated Search
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
DOT National Transportation Integrated Search
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
NASA Technical Reports Server (NTRS)
1979-01-01
Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.
Freight planning support system : final summary report
DOT National Transportation Integrated Search
2003-07-01
This report summarizes the activities and the findings of the Freight Planning Support System (FPSS) project conducted for the North Jersey Transportation Planning Authority (NJTPA). The underlying purpose of the project is to allow for better projec...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project
DOT National Transportation Integrated Search
1997-01-01
This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...
14 CFR 152.109 - Project eligibility: Airport planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
...; and (5) In the case of a proposed project for airport master planning in a large or medium air traffic hub, in the opinion of the Administrator— (i) There is an appropriate system plan identifying the need for the airport; (ii) The absence of a system plan is due to the failure of the responsible planning...
Nuclear rocket propulsion. NASA plans and progress, FY 1991
NASA Technical Reports Server (NTRS)
Clark, John S.; Miller, Thomas J.
1991-01-01
NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space explorer initiative (SEI) human and robotic missions to the moon and Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.
Nuclear rocket propulsion: NASA plans and progress - FY 1991
NASA Technical Reports Server (NTRS)
Clark, John S.; Miller, Thomas J.
1991-01-01
NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space exploration initiative (SEI) human and robotic missions to the Moon and to Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.
GEWEX Cloud System Study (GCSS) Working Group on Cirrus Cloud Systems (WG2)
NASA Technical Reports Server (NTRS)
Starr, David
2002-01-01
Status, progress and plans will be given for current GCSS (GEWEX Cloud System Study) WG2 (Working Group on Cirrus Cloud Systems) projects, including: (a) the Idealized Cirrus Model Comparison Project, (b) the Cirrus Parcel Model Comparison Project (Phase 2), and (c) the developing Hurricane Nora extended outflow model case study project. Past results will be summarized and plans for the upcoming year described. Issues and strategies will be discussed. Prospects for developing improved cloud parameterizations derived from results of GCSS WG2 projects will be assessed. Plans for NASA's CRYSTAL-FACE (Cirrus Regional Study of Tropical Anvils and Layers - Florida Area Cirrus Experiment) potential opportunities for use of those data for WG2 model simulations (future projects) will be briefly described.
Kentucky Allied Health Project Final Report: A State System for Allied Health Education.
ERIC Educational Resources Information Center
Kentucky State Council on Higher Education, Frankfort.
The accomplishments of the Kentucky Allied Health Project, which implemented a model articulated system of allied health education, are described. The system included plans to promote transition from one education level to another and articulation in educational planning and resource utilization. The project has greatly increased…
Nascom System Development Plan: System Description, Capabilities and Plans
NASA Technical Reports Server (NTRS)
1995-01-01
The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.
49 CFR 611.7 - Relation to planning and project development processes.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (ii) Two years after the project opens for revenue service, the grantee shall collect the “after” data... the project. (i) The plan shall provide for: Collection of “before” data on the current transit system... project; collection of “after” data on the transit system two years after opening of the new start project...
I-15 integrated corridor management system : project management plan.
DOT National Transportation Integrated Search
2011-06-01
The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...
NASA Technical Reports Server (NTRS)
Johnson, David W.
1991-01-01
The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.
23 CFR 450.318 - Transportation planning studies and project development.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Transportation planning studies and project development... § 450.318 Transportation planning studies and project development. (a) Pursuant to section 1308 of the... transportation operator(s) may undertake a multimodal, systems-level corridor or subarea planning study as part...
ERIC Educational Resources Information Center
Social and Rehabilitation Service (DHEW), Washington, DC.
The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…
DOT National Transportation Integrated Search
1996-05-15
This document constitutes the project plan for the Maryland Commercial Vehicle : Information Systems and Networks Prototype, a project undertaken by the State of : Maryland in partnership with the Federal Highway Administration, the Commonwealth of :...
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
Probabilistic approach to long range planning of manpower
NASA Technical Reports Server (NTRS)
Lejk, R. A.
1967-01-01
Publication presents a total long range planning model for project oriented organizations. The total model consists of planning systems which originate - /1/ at the project level and consolidate into an overall plan, and /2/ from a budetary ceiling and allocate to the individual projects. Analysis of /1/ and /2/ is provided for management decision making.
ART/Ada design project, phase 1: Project plan
NASA Technical Reports Server (NTRS)
Allen, Bradley P.
1988-01-01
The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
The TRAINS project: A case study in building a conversational planning agent
NASA Astrophysics Data System (ADS)
Allen, James F.; Schubert, Lenhart K.; Ferguson, George; Heeman, Peter; Hwang, Chung Hee; Kato, Tsuneaki; Light, Marc; Martin, Nathaniel G.; Miller, Bradford W.; Poesio, Massimo
1994-09-01
The TRAINS project is an effort to build a conversationally proficient planning assistant. A key part of the project is the construction of the TRAINS system, which provides the research platform for a wide range of issues in natural language understanding, mixed-initiative planning systems, and representing and reasoning about time, actions and events. Four years have not passed since the beginning of the project. Each year, we produced a demonstration system that focused on a dialog that illustrated particular aspects of our research. The commitment to building complete integrated systems is a significant overhead on the research, but we feel it is essential to guarantee that the results constitute real progress in the field. This paper describes the goals of the project, and our experience with the effort so far.
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
DOT National Transportation Integrated Search
1997-01-01
Prepared ca. 1997. The Configuration Management Plan (CMP) provides configuration management instructions and guidance for the Vessel Traffic Service (VTS) system of the Ports and Waterways Safety System (PAWSS) project. The CMP describes in detail t...
Project Planning and Reporting
NASA Technical Reports Server (NTRS)
1982-01-01
Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.
ERIC Educational Resources Information Center
Pulz, Michael; Lusti, Markus
PROJECTTUTOR is an intelligent tutoring system that enhances conventional classroom instruction by teaching problem solving in project planning. The domain knowledge covered by the expert module is divided into three functions. Structural analysis, identifies the activities that make up the project, time analysis, computes the earliest and latest…
Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Student Organizations--FBLA Projects and Activities Relating to Free Enterprise.
ERIC Educational Resources Information Center
Western Kentucky Univ., Bowling Green.
This guide for Future Business Leaders of America and Phi Beta Lambda chapters describes 25 economic awareness projects/activities to create awareness of the free enterprise economic system. Introductory materials include suggestions for project planning and management and a worksheet for planning activities and projects. The projects/activities…
Project Cost Estimation for Planning
DOT National Transportation Integrated Search
2010-02-26
For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...
Multigeneration data migration from legacy systems
NASA Astrophysics Data System (ADS)
Ratib, Osman M.; Liu, Brent J.; Kho, Hwa T.; Tao, Wenchao; Wang, Cun; McCoy, J. Michael
2003-05-01
The migration of image data from different generations of legacy archive systems represents a technical challenge and in incremental cost in transitions to newer generations of PACS. UCLA medical center has elected to completely replace the existing PACS infrastructure encompassing several generations of legacy systems by a new commercial system providing enterprise-wide image management and communication. One of the most challenging parts of the project was the migration of large volumes of legacy images into the new system. Planning of the migration required the development of specialized software and hardware, and included different phases of data mediation from existing databases to the new PACS database prior to the migration of the image data. The project plan included a detailed analysis of resources and cost of data migration to optimize the process and minimize the delay of a hybrid operation where the legacy systems need to remain operational. Our analysis and project planning showed that the data migration represents the most critical path in the process of PACS renewal. Careful planning and optimization of the project timeline and resources allocated is critical to minimize the financial impact and the time delays that such migrations can impose on the implementation plan.
Case study in health information management: strategic planning.
Homan, C V
1992-08-01
The strategic planning process has proven to be invaluable to Riverside Hospital's success. Involvement of all levels of the organization and integration of plans solidifies organizational commitments and provides a framework that assures accomplishment of overall goals. With major developments in computerization of medical records and other systems that support patient care data analysis on the horizon, Riverside's integrated plans are defining crucial information system projects. As the pool of available resources for projects continues to shrink, the planning format described assures funding of information system needs that will secure a position for Riverside in the health care marketplace of the future.
The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status
NASA Technical Reports Server (NTRS)
Clark, John S.; Miller, Thomas J.
1991-01-01
NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.
A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki
NASA Technical Reports Server (NTRS)
Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher
2010-01-01
The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.
ERIC Educational Resources Information Center
Baird, Aaron; Riggins, Frederick J.
2012-01-01
An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-02-23
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less
Solid Waste Information and Tracking System Client Server Conversion Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
GLASSCOCK, J.A.
2000-02-10
The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion
Machine translation project alternatives analysis
NASA Technical Reports Server (NTRS)
Bajis, Catherine J.; Bedford, Denise A. D.
1993-01-01
The Machine Translation Project consists of several components, two of which, the Project Plan and the Requirements Analysis, have already been delivered. The Project Plan details the overall rationale, objectives and time-table for the project as a whole. The Requirements Analysis compares a number of available machine translation systems, their capabilities, possible configurations, and costs. The Alternatives Analysis has resulted in a number of conclusions and recommendations to the NASA STI program concerning the acquisition of specific MT systems and related hardware and software.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clifford, David J.; Harris, James M.
2014-12-01
This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris
[Requirements for the successful installation of an data management system].
Benson, M; Junger, A; Quinzio, L; Hempelmann, G
2002-08-01
Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.
ERIC Educational Resources Information Center
McDaniel, Garry L.
The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide Collaborative Elder Abuse Prevention project. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for achieving a coordinated service delivery system for…
SDDOT transportation systems management & operations program plan.
DOT National Transportation Integrated Search
2016-06-01
The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...
DOT National Transportation Integrated Search
2000-01-01
The purpose of the Florida Rail System Plan is two-fold. First, it represents the rail : component of the Florida Transportation Plan (Agency Functional Plan) which, through an : annual series of policies, programs and projects, implements the Transp...
DOT National Transportation Integrated Search
2007-01-01
Surface transportation planning in the United States has become a complex system of intergovernmental planning : and environmental compliance requirements over the past several decades. As a result, the process from planning : stage to project implem...
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2011 CFR
2011-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2012 CFR
2012-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2014 CFR
2014-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
23 CFR 450.216 - Development and content of the statewide transportation improvement program (STIP).
Code of Federal Regulations, 2013 CFR
2013-04-01
... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and... research projects funded under 23 U.S.C. 505 and 49 U.S.C. 5305(e); (4) At the State's discretion, State planning and research projects funded with National Highway System, Surface Transportation Program, and/or...
Definition of optical systems payloads
NASA Technical Reports Server (NTRS)
Downey, J. A., III
1981-01-01
The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.
Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Millard, W. David; Johnson, Daniel M.; Henderson, John M.
2014-07-28
Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BURBANK, D.A.
This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
CRI planning and scheduling for space
NASA Technical Reports Server (NTRS)
Aarup, Mads
1994-01-01
Computer Resources International (CRI) has many years of experience in developing space planning and scheduling systems for the European Space Agency. Activities range from AIT/AIV planning over mission planning to research in on-board autonomy using advanced planning and scheduling technologies in conjunction with model based diagnostics. This article presents four projects carried out for ESA by CRI with various subcontractors: (1) DI, Distributed Intelligence for Ground/Space Systems is an on-going research project; (2) GMPT, Generic Mission Planning Toolset, a feasibility study concluded in 1993; (3) OPTIMUM-AIV, Open Planning Tool for AIV, development of a knowledge based AIV planning and scheduling tool ended in 1992; and (4) PlanERS-1, development of an AI and knowledge-based mission planning prototype for the ERS-1 earth observation spacecraft ended in 1991.
Systemic safety project selection tool.
DOT National Transportation Integrated Search
2013-07-01
"The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...
Planning for Applications of Communications Satellites in Education.
ERIC Educational Resources Information Center
O'Connell, William K.
This report of a project to develop and test a prototype system for the delivery of continuing education (CE) to two defined target groups of registered dietitians includes user needs, alternative approaches, the operational plan, the management plan, and personnel. Major tasks involved in the project are described: (1) development,…
The California general plan process and sustainable transportation planning
DOT National Transportation Integrated Search
2002-05-01
This research project assesses California's General Plan process as a tool for implementing sustainable development, with particular emphasis on transportation systems at the local level, including the relationship of local transportation systems to ...
Administrative Information Systems Plan for FY89
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-11-01
The Administrative Information Systems (AIS) Plan was developed to prioritize, track, and control the cost of AIS activities. This annually published plan, in conjunction with quarterly status reports, measures projected AIS activities and progress. The AIS Plan and quarterly reporting are administered jointly by the Director of Computing and an Organization 30 director. Priority development projects are clearly defined and closely managed efforts that consume significant resources. Directorate supplementals describe other AIS activity within each directorate, which may include: production support; technical support; development activity; and other AIS effort.
Stereo Orthogonal Axonometric Perspective for the Teaching of Descriptive Geometry
ERIC Educational Resources Information Center
Méxas, José Geraldo Franco; Bastos Guedes, Karla; da Silva Tavares, Ronaldo
2014-01-01
The representation of figures in mongean projection (double system planned orthographic projection used in the studies of Descriptive Geometry), specially when placed in a particular situation in relation to the projection plans, possesses the quality that, through them, the actual dimensions of represented spatial objects can be found directly…
NASA Technical Reports Server (NTRS)
1980-01-01
Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.
Advanced Ground Systems Maintenance Prognostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.
ERIC Educational Resources Information Center
Harari, Haim
Israel's current higher education system and projections for the future are examined. Higher education planning is also discussed, with attention to the establishment of the Planning and Grants Committee, basic data for system planning, and problems requiring decisions. Information on institutions, students, and budgets is provided, including…
NASA Astrophysics Data System (ADS)
Agugiaro, G.; Robineau, J.-L.; Rodrigues, P.
2017-09-01
Growing urbanisation, its related environmental impacts, and social inequalities in cities are challenges requiring a holistic urban planning perspective that takes into account the different aspects of sustainable development. One crucial point is to reconcile urban planning with environmental targets, which include decreasing energy demand and CO2 emissions, and increasing the share of renewable energy. Within this context, the project CI-NERGY aims to develop urban energy modelling, simulation and optimisation methods and tools to support decision making in urban planning. However, there are several barriers to the implementation of such tools, such as: fragmentation of involved disciplines, different stakeholders, multiplicity of scales in a city and extreme heterogeneity of data regarding all the processes to be addressed. Project CI-NERGY aims, among other goals, at overcoming these barriers, and focuses on two case study cities, Geneva in Switzerland and Vienna in Austria. In particular, project CI-NERGY faces several challenges starting with different cities, heterogeneous data sources and simulation tools, diverse user groups and their individual needs. This paper describes the experiences gathered during the project. After giving a brief overview of the project, the two case study cities, Geneva and Vienna, are briefly presented, and the focus shifts then on overall system architecture of the project, ranging from urban data modelling topics to the implementation of a Service-Oriented Architecture. Some of the challenges faced, the solutions found, as well some plans for future improvements are described and commented.
ERIC Educational Resources Information Center
Hunt, Lester W.; Burr, Donald F.
The Simu-School Program and the National Center for Educational Planning were conceived because of the need for (1) expertise in educational planning, (2) a system to collect and assemble the vast amount of knowledge concerning education, (3) community involvement in planning, and (4) a system to accurately interpret today's data in planning for…
ERIC Educational Resources Information Center
Boediono; And Others
The Educational Policy and Planning (EPP) Project assists the Indonesian Ministry of Education and Culture (MOEC) in establishing an information system to improve policy analysis and formulation. There are five elements of the project strategy: increase the ability of MOEC staff to create and use information for use in policy research, strengthen…
Environmentally Sound Small-Scale Agricultural Projects: Guidelines for Planning. Revised Edition.
ERIC Educational Resources Information Center
Altieri, Miguel; Vukasin, Helen L., Ed.
Environmental planning requires more than finding the right technology and a source of funds. Planning involves consideration of the social, cultural, economic, and natural environments in which the project occurs. The challenge is to develop sustainable food systems that have reasonable production but do not degrade the resource base and upset…
ERIC Educational Resources Information Center
Smith, Barbara J.
This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boren, K.L.; Johnson, K.R.
1978-11-01
Thirty units of a planned 205 geothermally heated hydroponic greenhouses are producing European cucumbers and tropic tomatoes near Wendel, California. The planned utilization of the geothermal resource in this project, hydroponics, in general, and the Honey Lake system is described. (MHR)
Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)
NASA Astrophysics Data System (ADS)
Selvy, Brian M.; Claver, Charles; Angeli, George
2014-08-01
This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project's needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.
Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2010-12-01
The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...
NASA Technical Reports Server (NTRS)
Kopardekar, Parimal H.
2010-01-01
This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders
DOT National Transportation Integrated Search
1994-01-01
This study focuses on defining HOV systems and their components, criteria, and related issues in a systems planning context (as compared with the conventional project level planning). Definitions are provided to establish the physical and socioeconom...
Accomplishments Under the Airport Improvement Program. Fiscal year 1987.
1987-01-01
APRON PORTLAND INTERNATIONAL JETPORT (PRIMARY) 17 $312,300 INSTALL RUNWAY LIGHTING SYSTEM 1B $1,481,738 EXTENDAPRON PRESQUE ISLE 06 $99,000 RECONSTRUCT...LOCATION AND PROJECT FEDERAL NAME OF AIRPORT NUMBER FUNDS DESCRIPTION OF WORK o PENNSYLVANIA S4 $198,000 CONDUCT STATE SYSTEM PLAN UPDATE COMMONWEALTH...OF PENNSYLVANIA (CONTINUOUS) (SYSTEM PLAN) R5 $200,000 CONDUCT REGIONAL SYSTEM PLAN UPDATE DELAWARE VALLEY REGION (CONTINUOUS) (SYSTEM PLAN) RS
National ESEA Chapter 1 Schoolwide Projects Conference.
ERIC Educational Resources Information Center
Cleveland Public Schools, OH.
This document is a collection of schoolwide compensatory education project plans for 22 elementary schools in the Cleveland (Ohio) Public Schools system, with funding provided by Chapter 1 of the Education Consolidation and Improvement Act. Chapter 1 project plans are included for the following schools: (1) Alfred A. Benesch; (2) Andrew J.…
A Navy Shore Activity Manpower Planning System for Civilians. Technical Report No. 24.
ERIC Educational Resources Information Center
Niehaus, R. J.; Sholtz, D.
This report describes the U.S. Navy Shore Activity Manpower Planning System (SAMPS) advanced development research project. This effort is aimed at large-scale feasibility tests of manpower models for large Naval installations. These local planning systems are integrated with Navy-wide information systems on a data-communications network accessible…
High Burnup Dry Storage Cask Research and Development Project, Final Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-02-27
EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less
Study to design and develop remote manipulator systems
NASA Technical Reports Server (NTRS)
Hill, J. W.; Salisbury, J. K., Jr.
1977-01-01
A description is given of part of a continuing effort both to develop models for and to augment the performance of humans controlling remote manipulators. The project plan calls for the performance of several standard tasks with a number of different manipulators, controls, and viewing conditions, using an automated performance measuring system; in addition, the project plan calls for the development of a force-reflecting joystick and supervisory display system.
Operative planning of functional sessions for multisatellite observation and communication systems
NASA Astrophysics Data System (ADS)
Darnopykh, Valeriy V.; Malyshev, Veniamin V.
2012-04-01
An important control aspect of modern satellite observation and communication systems is the control of the functional processes. Functional sessions proceed under conditions of restricted technical ability, large amounts or information to be processed by the on-board equipment, practice inequality of the received information, intentions of system management and operators, interests of customers and other factors. A large number of spacecrafts (SC) in orbital constellation is one of the most important factors affecting the functional process also. Besides that some modern projects of satellite systems are multifunctional that is mixed operations of observation and communication. Therefore the functioning of SC on-board equipment must be accurately co-ordinate. That is why the problem of operative planning the functioning of these systems, while directly affecting the efficiency of the system, is very complex and actual at present. A methodical approach and software package for operative planning of functional processes for satellite observation and communication systems, including multifunctional projects, are considered in the paper. The base scheme of this approach consists of four main stages: stage 1—modeling of SC orbital kinematics and dynamics; stage 2—modeling of system functional processes with all kind of restrictions and criterion function values; stage 3—solving an optimization tasks by numerical applicable algorithms and constructing the optimal (or accuracy) plans; stage 4—repeated plan optimization (different variants) and analyzing. Such scheme is the result of authors practical research which have been realized during last 15 years by the operative planning as for any kinds of single SC as for satellite systems with different structure of orbital constellation. The research helps to unify the procedure of operative planning, to formulate basic principles and approaches for its solving, to develop special software package. The main aspects of the approach proposed are illustrated in the paper. The results of the calculations of applied planning problems are presented. The objects of research in these problems are: projects of CBERS observation systems (1-3 SC) and projects of Iridium (66 SC) global communication system.
NASA Technical Reports Server (NTRS)
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
Implementation of a Project Management Office (PMO)--experiences from year 1.
Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann
2006-01-01
Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.
Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bissell, Gael
1985-01-01
This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.
NASA Technical Reports Server (NTRS)
Thomas, Leann; Utley, Dawn
2006-01-01
While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.
Advanced Ground Systems Maintenance Physics Models for Diagnostics Project
NASA Technical Reports Server (NTRS)
Harp, Janicce Leshay
2014-01-01
The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations.
DOT National Transportation Integrated Search
2010-09-13
Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...
DOT National Transportation Integrated Search
2001-10-01
This document is the third in a series of five that present the sequential results of the Thurston Regional Planning Council (TRPC) Regional Intelligent Transportation Systems (ITS) : Planning Project. This document presents an ITS Strategic Depl...
Louisiana Airport System Plan Five-Year Capital Improvement Program.
DOT National Transportation Integrated Search
1992-07-01
The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...
NASA Technical Reports Server (NTRS)
1998-01-01
Under an SBIR (Small Business Innovative Research) contract with Johnson Space Center, Knowledge Based Systems Inc. (KBSI) developed an intelligent software environment for modeling and analyzing mission planning activities, simulating behavior, and, using a unique constraint propagation mechanism, updating plans with each change in mission planning activities. KBSI developed this technology into a commercial product, PROJECTLINK, a two-way bridge between PROSIm, KBSI's process modeling and simulation software and leading project management software like Microsoft Project and Primavera's SureTrak Project Manager.
NASA Technical Reports Server (NTRS)
Dunn, Michael R.
2014-01-01
Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.
TSHIPS : Transportation shipping harmonization and integration planning system
DOT National Transportation Integrated Search
2001-03-01
This report documents the development of the Transportation Shipping Harmonization and Integration Planning System (TSHIPS). The TSHIPS project was developed to advance the state of the art in transportation systems analysis. Existing approaches and ...
NASA Technical Reports Server (NTRS)
Griner, James H.
2014-01-01
NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current plans for the prototype radio development.
An Introduction to Project PRIME and CAMPUS MINNESOTA. Project PRIME Report, Number 2.
ERIC Educational Resources Information Center
Cordes, David C.
PRIME is an acronym for Planning Resources in Minnesota Education. The project's primary objective is to test the implementation of CAMPUS (Comprehensive Analytical Methods for Planning University Systems) in one State College, one Junior College, and in one school at the University of Minnesota. The CAMPUS model was developed by the Institute for…
Validation of Mission Plans Through Simulation
NASA Astrophysics Data System (ADS)
St-Pierre, J.; Melanson, P.; Brunet, C.; Crabtree, D.
2002-01-01
The purpose of a spacecraft mission planning system is to automatically generate safe and optimized mission plans for a single spacecraft, or more functioning in unison. The system verifies user input syntax, conformance to commanding constraints, absence of duty cycle violations, timing conflicts, state conflicts, etc. Present day constraint-based systems with state-based predictive models use verification rules derived from expert knowledge. A familiar solution found in Mission Operations Centers, is to complement the planning system with a high fidelity spacecraft simulator. Often a dedicated workstation, the simulator is frequently used for operator training and procedure validation, and may be interfaced to actual control stations with command and telemetry links. While there are distinct advantages to having a planning system offer realistic operator training using the actual flight control console, physical verification of data transfer across layers and procedure validation, experience has revealed some drawbacks and inefficiencies in ground segment operations: With these considerations, two simulation-based mission plan validation projects are under way at the Canadian Space Agency (CSA): RVMP and ViSION. The tools proposed in these projects will automatically run scenarios and provide execution reports to operations planning personnel, prior to actual command upload. This can provide an important safeguard for system or human errors that can only be detected with high fidelity, interdependent spacecraft models running concurrently. The core element common to these projects is a spacecraft simulator, built with off-the- shelf components such as CAE's Real-Time Object-Based Simulation Environment (ROSE) technology, MathWork's MATLAB/Simulink, and Analytical Graphics' Satellite Tool Kit (STK). To complement these tools, additional components were developed, such as an emulated Spacecraft Test and Operations Language (STOL) interpreter and CCSDS TM/TC encoders and decoders. This paper discusses the use of simulation in the context of space mission planning, describes the projects under way and proposes additional venues of investigation and development.
An overview of the evaluation plan for PC/MISI: PC-based Multiple Information System Interface
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Lim, Bee Lee; Hall, Philip P.
1985-01-01
An initial evaluation plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intend to be used as a blueprint for the evaluation of this system. Each objective of the design project is discussed along with the evaluation parameters and methodology to be used in the evaluation of the implementation's achievement of those objectives. The potential of the system for research activities related to more general aspects of information retrieval is also discussed.
NASA Astrophysics Data System (ADS)
Kurui, P. K.; Mutua, F.
2016-12-01
The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.
NASA Astrophysics Data System (ADS)
Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun
2008-12-01
In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.
Utilization of Information Provided by the Wisconsin Management System.
ERIC Educational Resources Information Center
Rossmiller, Richard A.
The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…
Projecting technology change to improve space technology planning and systems management
NASA Astrophysics Data System (ADS)
Walk, Steven Robert
2011-04-01
Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.
Overview of NASA's Thermal Control System Development for Exploration Project
NASA Technical Reports Server (NTRS)
Stephan, Ryan A.
2011-01-01
The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.
Intelligent transportation systems (ITS) : program and projects
DOT National Transportation Integrated Search
1997-07-01
This is a brief outline of the current projects and programs related to the Intelligent Transportation Systems (ITS) initiatives, formerly known as Intelligent Vehicle Highway Systems (IVHS), being planned, developed, or implemented by the Michigan D...
1996-05-01
Systems 17 Motion Bases Upgraded Aero Misc > Contact Info • AMC, Lt Col Letica , Phone (618) 256-5696 L8 Upgrade Flow Plan Advance Planning Briefing...Projected Schedule: FY 05 > Requirement Document: AMMP >• Projected Program Size: ? < $40M > Funding Status/Stability: > POCs: • AMC, Lt Col Letica
DOT National Transportation Integrated Search
2008-12-15
Intelligent Transportation Systems (ITS) planning requires the use of tools to assess the performance of ITS deployment alternatives relative to each other and to other types of transportation system improvement alternatives. This research project in...
New York State intelligent transportation system commercial vehicle operations (CVO) : business plan
DOT National Transportation Integrated Search
1998-07-01
The purpose of this Business Plan is to describe the major Intelligent Transportation System (ITS) initiatives and projects in the area of Commercial Vehicle Operations (CVO) that have recently been or are planned to be undertaken in New York State b...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, R.E.
1994-11-02
This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.
Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCDANIEL, K.S.
1999-08-31
Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.
Evaluating projects for improving fish and wildlife habitat on National Forests.
Fred H. Everest; Daniel R. Talhelm
1982-01-01
Recent legislation (PL. 93-452; P.L. 94-588) has emphasized improvement of fish and wildlife habitat on lands of the National Forest System. A sequential procedure has been developed for screening potential projects to identify those producing the greatest fishery benefits. The procedureâwhich includes program planning, project planning, and intensive benefit/cost...
NOSC (Naval Ocean Systems Center) Program Manager’s Handbook.
1986-07-01
impact downstream on other obligations-can wreck the best program through loss of performance, credibility, sponsorship, and future opportunity...planning sessions should be alert to external constraints that may impact on the timely completion of the project. Networking, through planning sessions...schedule, will have significant impact on the project. One of the most important functions of project management
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.
Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Concurrent planning and execution for a walking robot
NASA Astrophysics Data System (ADS)
Simmons, Reid
1990-07-01
The Planetary Rover project is developing the Ambler, a novel legged robot, and an autonomous software system for walking the Ambler over rough terrain. As part of the project, we have developed a system that integrates perception, planning, and real-time control to navigate a single leg of the robot through complex obstacle courses. The system is integrated using the Task Control Architecture (TCA), a general-purpose set of utilities for building and controlling distributed mobile robot systems. The walking system, as originally implemented, utilized a sequential sense-plan-act control cycle. This report describes efforts to improve the performance of the system by concurrently planning and executing steps. Concurrency was achieved by modifying the existing sequential system to utilize TCA features such as resource management, monitors, temporal constraints, and hierarchical task trees. Performance was increased in excess of 30 percent with only a relatively modest effort to convert and test the system. The results lend support to the utility of using TCA to develop complex mobile robot systems.
United States Army Medical Materiel Development Activity: 1997 Annual Report.
1997-01-01
business planning and execution information management system (Project Management Division Database ( PMDD ) and Product Management Database System (PMDS...MANAGEMENT • Project Management Division Database ( PMDD ), Product Management Database System (PMDS), and Special Users Database System:The existing...System (FMS), were investigated. New Product Managers and Project Managers were added into PMDS and PMDD . A separate division, Support, was
Acquisition Systems Protection Planning the Manhatten Project: A Case Study
1994-06-03
This study examines the counterintelligence and security programs of the Manhattan Project , the United States acquisition of the atomic bomb, using...assessment methodology and counterintelligence techniques and procedures. Acquisition systems, Program protection, Manhattan Project , Atomic bomb, Technology protection, Counterintelligence, Security.
Year 2015 transportation plan : Huntsville Area Transportation Study
DOT National Transportation Integrated Search
1995-04-01
The Year 2015 Transportation Plan is an intermodal plan that considers all modes of the existing transportation system, identifies needs, provides policy direction and defines the goals for planning and : project development in the Huntsville urban a...
GCS plan for software aspects of certification
NASA Technical Reports Server (NTRS)
Shagnea, Anita M.; Lowman, Douglas S.; Withers, B. Edward
1990-01-01
As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
Experimental Packet Radio System Design Plan
1974-03-13
specific design parameters (packet format, data rates, modulation type, spread factor, etc.) for the initial system configuration. c. Prototype...are described along with size, weight and power estimates, and projections of per- formance parameters . d. Measurement and Test. The plan...are presented covering the communications link, system parameters , and various levels of network operation and performance. This plan is a snapshot
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 710.303 Section 710.303 Highways FEDERAL... ESTATE Project Development § 710.303 Planning. State and local governments conduct metropolitan and statewide planning to develop coordinated, financially constrained system plans to meet transportation needs...
Advanced Ground Systems Maintenance Physics Models For Diagnostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.
DOT National Transportation Integrated Search
2010-05-01
The University of Texas at El Paso (UTEP) is planning several projects that will have a substantial impact in : the transportation network in El Paso. This research project conducted a study of the integration of the El : Paso metropolitan transporta...
A plan for structured management of the Systems Approach to Training (SAT) process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schurman, D.L.
1987-01-01
This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burgard, K.G.
This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Planning occurs at three levels—national strategic planning, NFS unit planning, and project or activity... measures, and strategies for management of the NFS, as well as the other Forest Service mission areas... System unit planning. (1) NFS unit planning results in the development, amendment, or revision of a land...
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Planning occurs at three levels—national strategic planning, NFS unit planning, and project or activity... measures, and strategies for management of the NFS, as well as the other Forest Service mission areas... System unit planning. (1) NFS unit planning results in the development, amendment, or revision of a land...
NASA Astrophysics Data System (ADS)
Claver, C. F.; Selvy, Brian M.; Angeli, George; Delgado, Francisco; Dubois-Felsmann, Gregory; Hascall, Patrick; Lotz, Paul; Marshall, Stuart; Schumacher, German; Sebag, Jacques
2014-08-01
The Large Synoptic Survey Telescope project was an early adopter of SysML and Model Based Systems Engineering practices. The LSST project began using MBSE for requirements engineering beginning in 2006 shortly after the initial release of the first SysML standard. Out of this early work the LSST's MBSE effort has grown to include system requirements, operational use cases, physical system definition, interfaces, and system states along with behavior sequences and activities. In this paper we describe our approach and methodology for cross-linking these system elements over the three classical systems engineering domains - requirement, functional and physical - into the LSST System Architecture model. We also show how this model is used as the central element to the overall project systems engineering effort. More recently we have begun to use the cross-linked modeled system architecture to develop and plan the system verification and test process. In presenting this work we also describe "lessons learned" from several missteps the project has had with MBSE. Lastly, we conclude by summarizing the overall status of the LSST's System Architecture model and our plans for the future as the LSST heads toward construction.
Using computer software to improve group decision-making.
Mockler, R J; Dologite, D G
1991-08-01
This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.
DOT National Transportation Integrated Search
2000-02-01
This document is the applicant's guide for proposing intelligent transportation systems projects to Transport Canada and details such matters as eligibility, Transport Canada's program objectives and assessment of projects
Tennessee long-range transportation plan : project evaluation system
DOT National Transportation Integrated Search
2005-12-01
The Project Evaluation System (PES) Report is an analytical methodology to aid programming efforts and prioritize multimodal investments. The methodology consists of both quantitative and qualitative evaluation criteria built upon the Guiding Princip...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2014 CFR
2014-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2012 CFR
2012-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
49 CFR 260.25 - Additional information for Applicants not having a credit rating.
Code of Federal Regulations, 2013 CFR
2013-10-01
... the following: (1) Applicant's current and prospective traffic base, including by commodity and... prospective traffic base; (3) System-wide plans to maintain equipment and rights-of-way at current or improved... flow projections; (e) Contingency plans for termination of the project before completion, if necessary...
Documentation requirements for Applications Systems Verification and Transfer projects (ASVTs)
NASA Technical Reports Server (NTRS)
Suchy, J. T.
1977-01-01
NASA's Application Systems Verification and Transfer Projects (ASVTs) are deliberate efforts to facilitate the transfer of applications of NASA-developed space technology to users such as federal agencies, state and local governments, regional planning groups, public service institutions, and private industry. This study focused on the role of documentation in facilitating technology transfer both to primary users identified during project planning and to others with similar information needs. It was understood that documentation can be used effectively when it is combined with informal (primarily verbal) communication within each user community and with other formal techniques such as organized demonstrations and training programs. Documentation examples from eight ASVT projects and one potential project were examined to give scope to the investigation.
Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan
NASA Technical Reports Server (NTRS)
Klus, W. L.
1987-01-01
A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.
Finance and supply management project execution plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.
Solid waste information and tracking system client-server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
May, D.L.
1998-04-15
This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less
Probabilistic Reasoning for Plan Robustness
NASA Technical Reports Server (NTRS)
Schaffer, Steve R.; Clement, Bradley J.; Chien, Steve A.
2005-01-01
A planning system must reason about the uncertainty of continuous variables in order to accurately project the possible system state over time. A method is devised for directly reasoning about the uncertainty in continuous activity duration and resource usage for planning problems. By representing random variables as parametric distributions, computing projected system state can be simplified in some cases. Common approximation and novel methods are compared for over-constrained and lightly constrained domains. The system compares a few common approximation methods for an iterative repair planner. Results show improvements in robustness over the conventional non-probabilistic representation by reducing the number of constraint violations witnessed by execution. The improvement is more significant for larger problems and problems with higher resource subscription levels but diminishes as the system is allowed to accept higher risk levels.
DOT National Transportation Integrated Search
2017-03-01
The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...
Application of science-based restoration planning to a desert river system.
Laub, Brian G; Jimenez, Justin; Budy, Phaedra
2015-06-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
Application of Science-Based Restoration Planning to a Desert River System
NASA Astrophysics Data System (ADS)
Laub, Brian G.; Jimenez, Justin; Budy, Phaedra
2015-06-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
Application of science-based restoration planning to a desert river system
Laub, Brian G.; Jimenez, Justin; Budy, Phaedra
2015-01-01
Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.
Decision support frameworks and tools for conservation
Schwartz, Mark W.; Cook, Carly N.; Pressey, Robert L.; Pullin, Andrew S.; Runge, Michael C.; Salafsky, Nick; Sutherland, William J.; Williamson, Matthew A.
2018-01-01
The practice of conservation occurs within complex socioecological systems fraught with challenges that require transparent, defensible, and often socially engaged project planning and management. Planning and decision support frameworks are designed to help conservation practitioners increase planning rigor, project accountability, stakeholder participation, transparency in decisions, and learning. We describe and contrast five common frameworks within the context of six fundamental questions (why, who, what, where, when, how) at each of three planning stages of adaptive management (project scoping, operational planning, learning). We demonstrate that decision support frameworks provide varied and extensive tools for conservation planning and management. However, using any framework in isolation risks diminishing potential benefits since no one framework covers the full spectrum of potential conservation planning and decision challenges. We describe two case studies that have effectively deployed tools from across conservation frameworks to improve conservation actions and outcomes. Attention to the critical questions for conservation project planning should allow practitioners to operate within any framework and adapt tools to suit their specific management context. We call on conservation researchers and practitioners to regularly use decision support tools as standard practice for framing both practice and research.
A Case Study of the United States Navy’s Enterprise Resource Planning System
2006-06-01
incarnations, MRP-II added the capabilities of shop-floor management and distribution management activities. Later versions included the ability to manage ... finances , human resources, engineering, and project management. Enterprise Resource Planning systems were then developed as an integrated system
75 FR 14449 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... and procedures, and provides direction, planning and evaluation for information technology systems and... development, monitoring and evaluation of public health capabilities, plans, infrastructure and systems to... and maintains a real-time management information system to monitor projects funded by the State and...
NASA Technical Reports Server (NTRS)
Davis, Randal; Thalman, Nancy
1993-01-01
The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.
Logic system aids in evaluation of project readiness
NASA Technical Reports Server (NTRS)
Maris, S. J.; Obrien, T. J.
1966-01-01
Measurement Operational Readiness Requirements /MORR/ assignments logic is used for determining the readiness of a complex project to go forward as planned. The system used logic network which assigns qualities to all important criteria in a project and establishes a logical sequence of measurements to determine what the conditions are.
Business planning. Reasons, definitions, and elements.
Cardamone, Michael A; Shaver, Mark; Werthman, Ronald
2004-04-01
The Johns Hopkins Hospital and Health System has developed a centralized business planning structure that provides for creativity while incorporating a system of checks and balances. Combining standardization with flexibility allows for customization and variability. Using a team approach, the organization allows key players to contribute their experience and expertise to the planning for each new project.
Guidance and Control Software Project Data - Volume 1: Planning Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.
Aerospace Vehicle Design, Spacecraft Section. Volume 3
NASA Technical Reports Server (NTRS)
1988-01-01
Research results are presented for the following groups: Project Mars Airplane Vehicle and Reconnaissance Instrument Carrier (MAVRIC), ACME, ARES, Project ACRONYM, Mars Aircraft Recepticle with Technical Instruments, Aerobraking, and Navigation (MARTIAN), and NOMADS. Each project is described by the following areas of focus: mission planning and costs; aerobraking systems; structures and thermal control systems; attitude and articulation control systems; comman and data control systems; science instrumentation; and power and propulsion systems.
Project Management Using Modern Guidance, Navigation and Control Theory
NASA Technical Reports Server (NTRS)
Hill, Terry R.
2011-01-01
Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.
DOT National Transportation Integrated Search
2015-04-01
This implementation project supports streamlined project delivery, one of the goals outlined by the Texas : Department of Transportation (TxDOT) leadership to achieve an efficient and effective transportation system : in Texas. The project benefits T...
ITS strategic deployment plan : executive summary
DOT National Transportation Integrated Search
1997-02-27
The Salt Lake Valley ITS Early Deployment Planning Study-Phase II prepared the framework to deploy candidate Intelligent Transportation System (ITS) projects that address Salt Lake Valleys transportation needs. A planning process was used that inc...
NASA Technical Reports Server (NTRS)
Grindle, Laurie; Hackenberg, Davis L.
2016-01-01
UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.
Real-Time Projection to Verify Plan Success During Execution
NASA Technical Reports Server (NTRS)
Wagner, David A.; Dvorak, Daniel L.; Rasmussen, Robert D.; Knight, Russell L.; Morris, John R.; Bennett, Matthew B.; Ingham, Michel D.
2012-01-01
The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.
Edward B. Butler
2005-01-01
The fires of 2000 and 2002 catalyzed a national mandate for fuel treatment programs to facilitate wildfire mitigation, yet the issues that need to be considered when planning large landscape projects are daunting, often ending in gridlock due to planning conflicts. Hazardous fuels maps help little when planning for integrated, system-wide ecological objectives and fail...
Development and Evaluation of Educational Programs in Electromechanical Technology. Final Report.
ERIC Educational Resources Information Center
Roney, M. W.
The encompassing objective of this project was to assist two-year colleges in establishing electromechanical technican (EMT) training programs by developing the necessary planning and instructional materials and by providing direct program planning assistance. The research effort of the project was to develop and test an integrated systems of…
Model Programs: Childhood Education. Project PLAN.
ERIC Educational Resources Information Center
American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.
This booklet is one of 34 in a series of programs on childhood education prepared for the White House Conference on Children. In Parkersburg, West Virginia, Project PLAN (Program for Learning in Accordance with Needs) offers an individualized instructional system designed to enable each student to progress at his own rate, using the learning…
Issues and Challenges in Financing Professional Development in Education.
ERIC Educational Resources Information Center
Cohen, Carol E.
In 2000, the Finance Project received a planning grant to launch a new initiative on financing professional development in education. This report reflects and summarizes what the Finance Project learned during the planning year about both traditional systems of professional development and reform efforts and how they are financed, focusing on…
Assessing the Impact of Planned Social Change
ERIC Educational Resources Information Center
Campbell, Donald T.
2011-01-01
It is a special characteristic of all modern societies that people consciously decide on and plan projects designed to improve their social systems. It is their universal predicament that their projects do not always have their intended effects. It seems inevitable that in most countries this common set of problems, combined with the obvious…
Northeast Florida rural transit intelligent transportation system (ITS) : evaluation plan
DOT National Transportation Integrated Search
2001-05-01
The Northeast Florida Rural Transportation Intelligent Transportation System (ITS) project is a demonstration of ITS deployment in five rural Community Transportation Coordinator (CTC) agencies. The objective of the project is to test and evaluate th...
Code of Federal Regulations, 2010 CFR
2010-07-01
... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...
Code of Federal Regulations, 2011 CFR
2011-07-01
... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...
Department of the Air Force. FY 1995 Budget Estimates. Military Construction and Family Housing
1994-02-01
monorail lift systems and provide AFFF fire protection system, and elevators. Renovate engineering and work areas; provide new air make-up unit and...135,0U0 SY 1,200 880-212 AFFF FIRE SUPPRESSION SYSTEM LS 800 FOR FUEL CELL TOTAL: 10,450 9b. Future Projects: Typical Planned Next Three Years: 111...PROTECT 2 EA 3,600 PH II & AFFF PUMPS/RESERVOIR TOTAL: 27,900 9b. Future Projects: Typical Planned Next Three Years: 442-758 WAREHOUSE 107,000 SF
An efficient temporal logic for robotic task planning
NASA Technical Reports Server (NTRS)
Becker, Jeffrey M.
1989-01-01
Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.
Systems Engineering in NASA's R&TD Programs
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.
Coordinating robot motion, sensing, and control in plans. LDRD project final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xavier, P.G.; Brown, R.G.; Watterberg, P.A.
1997-08-01
The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less
Gregory K. Dillon; Zachary A. Holden; Penny Morgan; Bob Keane
2009-01-01
The Fire Severity Mapping System project is geared toward providing fire managers across the western United States with critical information for dealing with and planning for the ecological effects of wildfire at multiple levels of thematic, spatial, and temporal detail. For this project, we are developing a comprehensive, west-wide map of the landscape potential for...
Metis Hub: The Development of an Intuitive Project Planning System
DOE Office of Scientific and Technical Information (OSTI.GOV)
McConnell, Rachael M.; Lawrence Livermore National Lab.
2015-08-26
The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less
NASA Technical Reports Server (NTRS)
1975-01-01
Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.
MDOT implementation plan for GPS technology in planning, design, and construction delivery
DOT National Transportation Integrated Search
2010-09-13
Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, T.; Brandt, C.; Calfee, J.
1994-03-01
The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less
Using the SPICE system to help plan and interpret space science observations
NASA Technical Reports Server (NTRS)
Acton, Charles H., Jr.
1993-01-01
A portable multimission information system named SPICE is used to assemble, archive, and provide easy user access to viewing geometry and other ancillary information needed by space scientists to interpret observations of bodies within our solar system. The modular nature of this system lends it to use in planning such observations as well. With a successful proof of concept on Voyager, the SPICE system has been adapted to the Magellan, Galileo and Mars Observer missions, and to a variety of ground based operations. Adaptation of SPICE for Cassini and the Russian Mars 94/96 projects is underway, and work on Cassini will follow, SPICE has been used to support observation planning for moving targets on the Hubble Space Telescope Project. Applications for SPICE on earth science, space physics and other astrophysics missions are under consideration.
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... and concentrate solar energy onto the solar receiver of the PCU. The project also includes an... Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment... for the Stirling Energy Systems (SES) Solar Two Project and by this notice are announcing the opening...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... and concentrate solar energy onto the solar receiver of the PCU. The project also includes an... Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment... for the Stirling Energy Systems (SES) Solar Two Project and by this notice are announcing the opening...
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…
Long Range Master Plan for Maricopa County Community College District, 1978-2000.
ERIC Educational Resources Information Center
Tadlock Associates, Los Altos, CA.
This technical report analyzes community characteristics, projects growth, and suggests the development of educational delivery systems to meet Maricopa County Community College District's needs up to the year 2000. Assumptions in this planning effort include: (1) that the base components of the system will be regional campuses planned for 5,000…
Management Information System Project.
ERIC Educational Resources Information Center
Foley, Walter J.; Harr, Gordon G.
The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…
Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms
ERIC Educational Resources Information Center
Zeng, Yajun
2010-01-01
Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…
Minnesota urban partnership agreement national evaluation : traffic system data test plan.
DOT National Transportation Integrated Search
2009-11-17
This report presents the traffic system data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employi...
DOT National Transportation Integrated Search
1997-08-01
This system architecture paper will discuss proposed architectures for the four infrastructure oriented program areas defined by the project team and presented in the Strategic Deployment Plan (August 1997). This report will concentrate on defi...
NASA Technical Reports Server (NTRS)
1991-01-01
Recommendations are made after 32 interviews, lesson identification, lesson analysis, and mission characteristics identification. The major recommendations are as follows: (1) to develop end-to-end planning and scheduling operations concepts by mission class and to ensure their consideration in system life cycle documentation; (2) to create an organizational infrastructure at the Code 500 level, supported by a Directorate level steering committee with project representation, responsible for systems engineering of end-to-end planning and scheduling systems; (3) to develop and refine mission capabilities to assess impacts of early mission design decisions on planning and scheduling; and (4) to emphasize operational flexibility in the development of the Advanced Space Network, other institutional resources, external (e.g., project) capabilities and resources, operational software and support tools.
Indonesia solar home systems project for rural electrification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanghvi, A.P.
1997-12-01
This paper presents, from a financing aspect the broad issues involved in a plan to provide solar home systems (SHS) to provide rural electrification in several areas of rural Indonesia. The paper discusses the approaches being used to provide funding, develop awareness of the technology, and assure the success of the project. The plan involves the use of grant money to help with some of the initial costs of such systems, and thereby to encourage local financing on a terms rather than cash basis. There are needs for market development, and development of a business structure in the country tomore » support this type of technology. Provided this plan can succeed, it may serve as a model for further efforts.« less
The Feasibility of Instituting a Department Head Screen in the Naval Special Warfare Community.
1985-12-01
community, and through use of the Structured Accession Planning System for Officers (STRAP-O) model, projects the community from 1985 to 1991 both with and...Placement Officer. It looks at the current state of the NSW community, and through use of the Structured Accession Planning System for Officers (STRAP-0...ACCESSION PLANNING SYSTEM FOR OFFICERS----------------------------------------19 Ill. NAVAL SPECIAL WARFARE COMMUNITY RESPONSE TO PROPOSAL
NASA Technical Reports Server (NTRS)
1975-01-01
The organization, objectives, and accomplishments of the panel on Land Use Planning are reported. Technology developments, and projected developments are discussed along with anticipated information requirements. The issues for users, recommended remote sensing programs, and space systems are presented. It was found that remote sensing systems are useful in future land use planning. It is recommended that a change detection system for monitoring land use and critical environmental areas be developed by 1979.
Road weather information system statewide implementation plan.
DOT National Transportation Integrated Search
2014-03-01
The objective of this project was to develop a plan for deploying a statewide RWIS to support both current NYSDOT operations and future MDSS applications. To develop the plan, various information and data sources were investigated, including the curr...
Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2014-01-01
This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...
Engineering Technical Review Planning Briefing
NASA Technical Reports Server (NTRS)
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
1989-08-01
microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and
We Scrum Every Day: Using Scrum Project Management Framework for Group Projects
ERIC Educational Resources Information Center
Pope-Ruark, Rebecca
2012-01-01
Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…
Managemant of NASA's major projects
NASA Technical Reports Server (NTRS)
James, L. B.
1973-01-01
Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.
French Plans for Fifth Generation Computer Systems.
1984-12-07
centrally man- French industry In electronics, compu- aged project in France that covers all ters, software, and services and to make the facets of the...Centre National of Japan’s Fifth Generation Project , the de Recherche Scientifique (CNRS) Cooper- French scientific and industrial com- ative Research...systems, man-computer The National Projects interaction, novel computer structures, The French Ministry of Research and knowledge-based computer systems
Defect measurement and analysis of JPL ground software: a case study
NASA Technical Reports Server (NTRS)
Powell, John D.; Spagnuolo, John N., Jr.
2004-01-01
Ground software systems at JPL must meet high assurance standards while remaining on schedule due to relatively immovable launch dates for spacecraft that will be controlled by such systems. Toward this end, the Software Quality Improvement (SQI) project's Measurement and Benchmarking (M&B) team is collecting and analyzing defect data of JPL ground system software projects to build software defect prediction models. The aim of these models is to improve predictability with regard to software quality activities. Predictive models will quantitatively define typical trends for JPL ground systems as well as Critical Discriminators (CDs) to provide explanations for atypical deviations from the norm at JPL. CDs are software characteristics that can be estimated or foreseen early in a software project's planning. Thus, these CDs will assist in planning for the predicted degree to which software quality activities for a project are likely to deviation from the normal JPL ground system based on pasted experience across the lab.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.
This annual report is a deliverable for fiscal year 2006 (FY06) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to the 2000 and 2004 Biological Opinions on operation of the Federal Columbia River Power System. The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates implementation of the Estuary RME Plan. In FY06, EOS project accomplishments included: 1) subgroup meetings; 2)more » participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version May 2006) based on comments by EOS members, the Independent Scientific Review Panel, and other reviewers. In the context of uncertainty about the direction of the federal RME due to litigation on the FCRPS Biological Opinion, FY06 activities for the EOS project resulted in expanded substantive coordination with other regional RME forums, project tracking infrastructure, and a new version of the Estuary RME Plan.« less
Using community-based evidence for decentralized health planning: insights from Maharashtra, India.
Shukla, Abhay; Khanna, Renu; Jadhav, Nitin
2018-01-01
Health planning is generally considered a technical subject, primarily the domain of health officials with minimal involvement of community representatives. The National Rural Health Mission launched in India in 2005 recognized this gap and mandated mechanisms for decentralized health planning. However, since planning develops in the context of highly unequal power relations, formal spaces for participation are necessary but not sufficient. Hence a project on capacity building for decentralized health planning was implemented in selected districts of Maharashtra, India during 2010-13. This process developed on the platform of officially supported community-based monitoring and planning, a process for community feedback and participation towards health system change. A specific project on capacity building for decentralized planning included a structured learning course and workshops for major stakeholders. An evaluation of the project, including in-depth interviews of various participants and analysis of change in local health planning processes, revealed positive changes in intervention areas, including increased capacity of key stakeholders leading to preparation of evidence-based, innovative planning proposals, significant community oriented changes in utilization of health facility funds, and inclusion of community-based proposals in village, health facility-based block and district plans. Transparency related to planning increased along with responsiveness of health providers to community suggestions. A key lesson is that active facilitation of decentralized health planning and influencing the health system to expand participation, are essential to ensure changes in planning. Effective strategies included: identifying people's health service related priorities through community-based monitoring, capacity building of diverse stakeholders regarding local health planning, and advocacy to enable participation of community-based actors in the planning process. This combination of strategies draws upon the framework of 'empowered participatory governance' which necessitates combining a degree of 'countervailing power' and acceptance of participation by the system, for new forms of governance to emerge. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.
San Francisco urban partnership agreement, national evaluation : traffic system data test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing traffic system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA projects fo...
Using Executive Information Systems to Manage Capital Projects and Facilities.
ERIC Educational Resources Information Center
Kaynor, Robert
1993-01-01
In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…
San Francisco urban partnership agreement, national evaluation : transit system data test plan.
DOT National Transportation Integrated Search
2011-06-01
This report presents the test plan for collecting and analyzing the transit system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA project...
IBM PC/IX operating system evaluation plan
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros
1984-01-01
An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.
Strengthening the management of ESA - the Inter-Directorate Reform of Corporate and Risk Management
NASA Astrophysics Data System (ADS)
Feustel-Büechl, Jörg; Arend, Harald; Derio, Eric; Infante, Giovanni; Kreiner, Gerhard; Phaler, Jesse; Tabbert, Michael
2007-02-01
ESA has undertaken the Inter-Directorate Reform of Corporate and Risk Management to strengthen the Agency's internal operations. The reform was completed at the end of 2006, encompassing five dedicated projects on Risk Management, Agency-Wide Controlling System, Project Plan and Integrated Project Review, General Budget Structure and Charging Policy, and Corporate Information Systems. It has contributed to improved management of the Agency's internal operations by engaging all internal stakeholders in a common objective, introducing improvements to planning and management methods, elaborating consolidated information structures and tools, contributing to enhanced transparency and accountability, and by providing qualified new policies, processes and tools.
The NASA-Lewis/ERDA solar heating and cooling technology program. [project planning/energy policy
NASA Technical Reports Server (NTRS)
Couch, J. P.; Bloomfield, H. S.
1975-01-01
Plans by NASA to carry out a major role in a solar heating and cooling program are presented. This role would be to create and test the enabling technology for future solar heating, cooling, and combined heating/cooling systems. The major objectives of the project are to achieve reduction in solar energy system costs, while maintaining adequate performance, reliability, life, and maintenance characteristics. The project approach is discussed, and will be accomplished principally by contract with industry to develop advanced components and subsystems. Advanced hardware will be tested to establish 'technology readiness' both under controlled laboratory conditions and under real sun conditions.
Computer-aided software development process design
NASA Technical Reports Server (NTRS)
Lin, Chi Y.; Levary, Reuven R.
1989-01-01
The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.
Development Activities on Airbreathing Combined Cycle Engines
NASA Technical Reports Server (NTRS)
McArthur, J. Craig; Lyles, Garry (Technical Monitor)
2000-01-01
Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.
Reengineering the Project Design Process
NASA Technical Reports Server (NTRS)
Casani, E.; Metzger, R.
1994-01-01
In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.
Study of the Subarea Approach to Health Manpower Planning.
ERIC Educational Resources Information Center
Comprehensive Health Planning, Inc., Chicago, IL.
Recognizing the need for a health manpower planning system that would insure the recruitment, training, utilization, and retention of area residents as skilled providers of health care, Comprehensive Health Planning, Inc., Metropolitan Chicago (CHP), and the West Side Health Planning Organization (WSHPO) embarked on a 1-year project to demonstrate…
76 FR 77300 - Alaska Federal Lands Long Range Transportation Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-12
... of and actions for coordinated planning and decision making among federal land management agencies... consolidate efforts through long-term coordination in transportation planning and decision-making processes... implementing projects; facilitating objective decision making for the transportation system; and developing...
DOT National Transportation Integrated Search
1998-01-01
This plans purpose is to encourage coordinated, efficient and safe commercial vehicle operations throughout Montana, and to promote inter-agency and regional cooperation as ITS/CVO projects are developed and deployed. The Plan discusses Montana...
STS/Spacelab payload utilization planning study: Executive summary
NASA Technical Reports Server (NTRS)
1976-01-01
The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.
ERIC Educational Resources Information Center
National Planning Association, Washington, DC.
Focusing on data needs and methods for manpower planning and manpower projections, this document is one in a series of six volumes reporting the results of the National Manpower Survey (NMS) of the Criminal Justice System. Chapter 1 of five chapters discusses the role and objectives of criminal justice manpower planning at different levels of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama
2007-07-01
NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less
DOT National Transportation Integrated Search
1996-12-02
THE PURPOSE OF THIS DOCUMENT IS TO PROVIDE INFORMATION ON THE PLANNING FOR THE DEVELOPMENT AND DEPLOYMENT OF EDI STANDARDS FOR COMMERCIAL VEHICLE INFORMATION SYSTEMS AND NETWORKS (CVISN). THE STATUS, PRIORITIES, AND SCHEDULES FOR THIS EFFORT ARE CONT...
Improving Collaborative School-Agency Transition Planning: A Statewide DBMS Approach.
ERIC Educational Resources Information Center
Peterson, Randolph L.; Roessler, Richard T.
1997-01-01
Describes the development and components of a referral database management system developed by the Arkansas Transition Project. The system enables individualized-education-plan team members to refer students with disabilities directly to adult agencies and to receive a monitoring report describing the agency response to the referral. The system is…
Pacific Northwest National Laboratory institutional plan: FY 1996--2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-01
This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.
Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, C.; Lightman, A.
This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.
Software for project-based learning of robot motion planning
NASA Astrophysics Data System (ADS)
Moll, Mark; Bordeaux, Janice; Kavraki, Lydia E.
2013-12-01
Motion planning is a core problem in robotics concerned with finding feasible paths for a given robot. Motion planning algorithms perform a search in the high-dimensional continuous space of robot configurations and exemplify many of the core algorithmic concepts of search algorithms and associated data structures. Motion planning algorithms can be explained in a simplified two-dimensional setting, but this masks many of the subtleties and complexities of the underlying problem. We have developed software for project-based learning of motion planning that enables deep learning. The projects that we have developed allow advanced undergraduate students and graduate students to reflect on the performance of existing textbook algorithms and their own variations on such algorithms. Formative assessment has been conducted at three institutions. The core of the software used for this teaching module is also used within the Robot Operating System, a widely adopted platform by the robotics research community. This allows for transfer of knowledge and skills to robotics research projects involving a large variety robot hardware platforms.
242-A Evaporator quality assurance plan. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Basra, T.S.
1995-05-04
The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (calledmore » process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks.« less
PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Hall, Philip P.
1985-01-01
The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less
Project Management Using Modern Guidance, Navigation and Control Theory
NASA Technical Reports Server (NTRS)
Hill, Terry
2010-01-01
The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.
Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes
NASA Technical Reports Server (NTRS)
Lewis, Pattie
2005-01-01
The objective of this project is to qualify candidate alternatives to Aliphatic Isocyanate Polyurethane coatings under the specifications for the standard system. This project will compare coating performance of the proposed alternatives to existing coating systems or standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... § 625.2 Policy. (a) Plans and specifications for proposed National Highway System (NHS) projects shall..., restoration, and rehabilitation (RRR) projects, other than those on the Interstate system and other freeways..., bridges, the roadside, and appurtenances to a condition of structural or functional adequacy. (c) An...
A BIM-based system for demolition and renovation waste estimation and planning.
Cheng, Jack C P; Ma, Lauren Y H
2013-06-01
Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.
2013-01-01
proposed acquisition of a variety of armoured vehicle simulators for training within the Canadian Forces. The Directorate of Land Requirements (DLR... armoured vehicle operations under the Land Vehicle Crew Training System (LVCTS) project. DLR has published a Letter of Interest (LOI) to solicit input...LVCTS project staff to discuss the intent of the project. Qualification Standards and Training Plans for several military armoured vehicle
ERIC Educational Resources Information Center
Cummings, C. Peter; Cook, Desmond L.
This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…
Underwater Advanced Time-Domain Electromagnetic System
2017-03-03
SUPPLEMENTARY NOTES 14. ABSTRACT The overall objective of the project is to design , build and demonstrate an underwater advanced time -domain...Description The overall objective of the project is to design , build and demonstrate an underwater advanced time - domain electromagnetic (TEM) system...Electromagnetic System Design (July, 2015), and in the Underwater Advanced Time -Domain Electromagnetic System Evaluation Plan (October, 2016). A
ERIC Educational Resources Information Center
League for Innovation in the Community Coll., Los Angeles, CA.
Project USHER is designed to help community colleges implement a humanistic management system. This objective is to be achieved by giving each participating college the capability to redesign its own educational system through implementing a planning, programming, budgeting, and evaluation system (PPBE) within the context of participative…
NICA project management information system
NASA Astrophysics Data System (ADS)
Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.
2016-09-01
The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.
NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems
NASA Technical Reports Server (NTRS)
Lawson, B. Michael; Jan, Darrell
2006-01-01
Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.
Cape Cod National Seashore alternative transportation systems long range planning study
DOT National Transportation Integrated Search
2003-05-01
This project involves the development of short-range and long-range plans for alternative transportation to, from, and within the Cape Cod National Seashore. The five-year plan notes that improved public transportation services are needed both to mit...
The development of a program analysis environment for Ada
NASA Technical Reports Server (NTRS)
Brown, David B.; Carlisle, Homer W.; Chang, Kai-Hsiung; Cross, James H.; Deason, William H.; Haga, Kevin D.; Huggins, John R.; Keleher, William R. A.; Starke, Benjamin B.; Weyrich, Orville R.
1989-01-01
A unit level, Ada software module testing system, called Query Utility Environment for Software Testing of Ada (QUEST/Ada), is described. The project calls for the design and development of a prototype system. QUEST/Ada design began with a definition of the overall system structure and a description of component dependencies. The project team was divided into three groups to resolve the preliminary designs of the parser/scanner: the test data generator, and the test coverage analyzer. The Phase 1 report is a working document from which the system documentation will evolve. It provides history, a guide to report sections, a literature review, the definition of the system structure and high level interfaces, descriptions of the prototype scope, the three major components, and the plan for the remainder of the project. The appendices include specifications, statistics, two papers derived from the current research, a preliminary users' manual, and the proposal and work plan for Phase 2.
IDC Re-Engineering Phase 3 Development Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harris, James M.; Burns, John F.; Pollock, David L.
2017-01-01
Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.
The Habitat Demonstration Unit Project Overview
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S.
2010-01-01
This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process.
Geographic information system development in the CARETS project
Mitchell, William B.; Fegeas, Robin G.; Fitzpatrick, Katherine A.; Hallam, Cheryl A.
1977-01-01
Experience in the development of a geographic information system to support the CARETS project has confirmed the considerable advantages that may accrue by paralleling the system development with a rational and balanced system production effort which permits the integration of the education and training of users with interim deliverable products to them. Those advantages include support for a long-term staff plan that recognizes substantial staff changes through system development and implementation, a fiscal plan that provides continuity in resources necessary for total system development, and a feedback system which allows the user to communicate his experiences in using the system. Thus far balance between system development and system production has not been achieved because of continuing large-scale spatial data processing requirements coupled with strong and insistent demands from users for immediately deliverable products from the system. That imbalance has refocussed staffing and fiscal plans from long-term system development to short- and near-term production requirements, continuously extends total system development time, and increases the possibility that later system development may reduce the usefulness of current interim products.
75 FR 9250 - Notice of Public Meeting, BLM-Alaska Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... Land Management, on a variety of planning and management issues associated with public land management.... Manager reports. Stimulus projects update. Alaska Land Information System. National Landscape Conservation System anniversary. Resource management planning. Other topics of interest to the RAC. All meetings are...
DOT National Transportation Integrated Search
2010-11-01
This project developed a GIS-based Spatial Decision Support System to help local, metropolitan, and state : jurisdictions and authorities in Texas understand the implications of transportation planning and : investment decisions, and plan appropriate...
ERIC Educational Resources Information Center
Wanger, Judith; And Others
Designed to facilitate communications in future automation projects between library and data processing personnel, especially those projects involving the use of automated systems in the service of disabled patrons, this guide identifies and describes a master set of major circulation system requirements and design considerations, and illustrates…
System and Campus Level Enrollment Projections and Environmental Scan, 1988-1998.
ERIC Educational Resources Information Center
Gaylord, Thomas A.; And Others
Alaska's first long-range, system-wide enrollment projection study since the inception of the higher education system's restructuring plan is reported. The study was undertaken in response to statewide economic distress, a decline in state funding of higher education, and a pattern of out-migration by the college-age population, particularly in…
3D Geovisualization & Stylization to Manage Comprehensive and Participative Local Urban Plans
NASA Astrophysics Data System (ADS)
Brasebin, M.; Christophe, S.; Jacquinod, F.; Vinesse, A.; Mahon, H.
2016-10-01
3D geo-visualization is more and more used and appreciated to support public participation, and is generally used to present predesigned planned projects. Nevertheless, other participatory processes may benefit from such technology such as the elaboration of urban planning documents. In this article, we present one of the objectives of the PLU++ project: the design of a 3D geo-visualization system that eases the participation concerning local urban plans. Through a pluridisciplinary approach, it aims at covering the different aspects of such a system: the simulation of built configurations to represent regulation information, the efficient stylization of these objects to make people understand their meanings and the interaction between 3D simulation and stylization. The system aims at being adaptive according to the participation context and to the dynamic of the participation. It will offer the possibility to modify simulation results and the rendering styles of the 3D representations to support participation. The proposed 3D rendering styles will be used in a set of practical experiments in order to test and validate some hypothesis from past researches of the project members about 3D simulation, 3D semiotics and knowledge about uses.
USL/DBMS NASA/PC R and D project system design standards
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Moreau, Dennis R.
1984-01-01
A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.
Project W-314 specific test and evaluation plan for AZ tank farm upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-08-12
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests andmore » inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.« less
A transportation-scheduling system for managing silvicultural projects
Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald
2005-01-01
A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...
Project for Integration of Pupils with Special Needs in Spain.
ERIC Educational Resources Information Center
Marchesi, Alvaro
1986-01-01
This paper analyzes a project approved by the Spanish government in 1985 to integrate special needs children into regular education. Outlined are characteristics of the Spanish educational system, parameters of practice in the integration project, and plans for the systematic evaluation of the integration project. (Author/JDD)
ERIC Educational Resources Information Center
Darder Mesquida, Antònia; Pérez Garcias, Adolfina
2015-01-01
Research project tutoring appears as a crucial element for teaching; it is a planned action based on the relationship between a tutor and a student. This paper presents the findings of a design and development research which has as its main aim to create an organization system for the tutoring of online research projects. That system seeks to…
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
ERIC Educational Resources Information Center
Cotter, Barbara
Intended to aid administrators and users of social services in establishing information systems, this comprehensive guide to the design of such systems identifies the elements, effective strategies, and potential pitfalls involved in their planning, implementation, and utilization. Detailed discussions of management strategies for system…
External tank project new technology plan. [development of space shuttle external tank system
NASA Technical Reports Server (NTRS)
1973-01-01
A production plan for the space shuttle external tank configuration is presented. The subjects discussed are: (1) the thermal protection system, (2) thermal coating application techniques, (3) manufacturing and tooling, (4) propulsion system configurations and components, (5) low temperature rotating and sliding joint seals, (6) lightning protection, and (7) nondestructive testing technology.
Final report : sampling plan for pavement condition ratings of secondary roads.
DOT National Transportation Integrated Search
1984-01-01
The purpose of this project was to develop a random sampling plan for use in selecting segments of the secondary highway system for evaluation under the Department's PMS. The plan developed is described here. It is a simple, workable, random sampling...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fynan, G.A.; Sload, A.; Adamson, E.J.
This paper presents the successes and lessons learned during recent low NOx burner and SNCR projects on generating units at New England Power`s Salem Harbor Generating Station. The principals involved in the project were New England Power Company, New England Power Service Company, Stone and Webster Engineering Corp. and Deutsche-Babcock Riley Inc. One unit was retrofitted with 16 Riley CCV burners with an OFA system, the other with 12 low NOx burners only. In addition to the burners, a SNCR system was also installed on three units. Since each of the burner systems are interdependent (SNCR was treated separately duringmore » design phases and optimized along with the burner systems), close cooperation during the design stages was essential to ensuring a successful installation, startup and optimization. This paper will present the coordinated effort put forth by each company toward this goal with the hope of assisting others who may be planning a similar effort. A summary of the operating results will also be presented. The up front teamwork and advance planning that went into the design stages of the project resulted in a number of successful outcomes e.g. scanner reliability, properly operating oil supply system, compatibility of burners and burner front oil system with new Burner Management System (BMS), reliable first attempt burner ignition and more. Advance planning facilitated pre-outage work and factored into keeping schedules and budgets on track.« less
Landfill Gas Electricity Project Interconnection Webinar
This page contains information about a webinar LMOP offered to LMOP Partners to address questions associated with connecting electricity generating systems to the grid during LFG energy project planning and implementation.
Project resources planning and control
NASA Technical Reports Server (NTRS)
Sibbers, C. W.
1984-01-01
This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.
Appendix X. ComField Information Management System.
ERIC Educational Resources Information Center
Coffin, Robert W.
This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…
Historical and projected power requirements
NASA Technical Reports Server (NTRS)
Wolfe, M. G.
1978-01-01
Policy planning for projected space power requirements is discussed. Topics of discussion cover: (1) historical space power trends (prime power requirements and power system costs); and (2) two approaches to future space power requirements (mission/traffic model approach and advanced system scenario approach). Graphs, tables, and flow charts are presented.
Program and Project Management Framework
NASA Technical Reports Server (NTRS)
Butler, Cassandra D.
2002-01-01
The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.
An Examination of Leadership Types among Generation Y and Its Impact on Virtual Team Effectiveness
ERIC Educational Resources Information Center
Graham, C. Matt
2013-01-01
The majority of database system development projects end in failure. Reasons that include, the system not being developed on time, the system was developed over budget, and the system developed did not meet the planned project's criteria. These failures are compounded by the use of virtual teams which includes problems with team formation, the…
Daniel Navon
1978-01-01
These 14 papers were submitted to a conference of Project Group P4.07 Division IV, International Union of Forestry Research Organizations. Topics discussed included the uses of simulations, analytical techniques, and mathematical programming techniques in land management planning, reforestation programs, intensive forestry, timber management and production, tree growth...
RDD-100 and the systems engineering process
NASA Technical Reports Server (NTRS)
Averill, Robert D.
1994-01-01
An effective systems engineering approach applied through the project life cycle can help Langley produce a better product. This paper demonstrates how an enhanced systems engineering process for in-house flight projects assures that each system will achieve its goals with quality performance and within planned budgets and schedules. This paper also describes how the systems engineering process can be used in combination with available software tools.
Progress in Decommissioning the Humboldt Bay Power Plant - 13604
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John
Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less
Integrated urban systems model with multiple transportation supply agents.
DOT National Transportation Integrated Search
2012-10-01
This project demonstrates the feasibility of developing quantitative models that can forecast future networks under : current and alternative transportation planning processes. The current transportation planning process is modeled : based on empiric...
Specific test and evaluation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), andmore » Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Evolving the Technical Infrastructure of the Planetary Data System for the 21st Century
NASA Technical Reports Server (NTRS)
Beebe, Reta F.; Crichton, D.; Hughes, S.; Grayzeck, E.
2010-01-01
The Planetary Data System (PDS) was established in 1989 as a distributed system to assure scientific oversight. Initially the PDS followed guidelines recommended by the National Academies Committee on Data Management and Computation (CODMAC, 1982) and placed emphasis on archiving validated datasets. But overtime user demands, supported by increased computing capabilities and communication methods, have placed increasing demands on the PDS. The PDS must add additional services to better enable scientific analysis within distributed environments and to ensure that those services integrate with existing systems and data. To face these challenges the Planetary Data System (PDS) must modernize its architecture and technical implementation. The PDS 2010 project addresses these challenges. As part of this project, the PDS has three fundamental project goals that include: (1) Providing more efficient client delivery of data by data providers to the PDS (2) Enabling a stable, long-term usable planetary science data archive (3) Enabling services for the data consumer to find, access and use the data they require in contemporary data formats. In order to achieve these goals, the PDS 2010 project is upgrading both the technical infrastructure and the data standards to support increased efficiency in data delivery as well as usability of the PDS. Efforts are underway to interface with missions as early as possible and to streamline the preparation and delivery of data to the PDS. Likewise, the PDS is working to define and plan for data services that will help researchers to perform analysis in cost-constrained environments. This presentation will cover the PDS 2010 project including the goals, data standards and technical implementation plans that are underway within the Planetary Data System. It will discuss the plans for moving from the current system, version PDS 3, to version PDS 4.
DOT National Transportation Integrated Search
1997-09-30
This Integrated Logistics Support Plan (ILSP) serves as the master logistics planning document that describes necessary logistic activities, assigns responsibility for those activities, and establishes a schedule for completion. It is one of the init...
Moses Lake Fishery Restoration Project : FY 1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None given
2000-12-01
The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less
ERIC Educational Resources Information Center
Bhola, H. S.
Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…
2017-09-18
Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement En vi ro nm en ta l L ab or at or y...Engineering Center-River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 396939, “Missouri River Recovery Management Plan and Environmental
MSFC Propulsion Systems Department Knowledge Management Project
NASA Technical Reports Server (NTRS)
Caraccioli, Paul A.
2007-01-01
This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... Ivanpah Solar Electric Generating System (ISEGS) Project located in San Bernardino County, California. The... FX0000 LVRWB09B2400 LLCAD09000] Notice of Availability of the Record of Decision for the Ivanpah Solar Electric Generating System Project and Approved Plan Amendment to the California Desert Conservation Area...
Hébert, Réjean
2016-01-01
Funding long-term care (LTC) is a challenge under the existing Beveridgean universal healthcare system. The Autonomy Insurance (AI) plan developed in Quebec was an attempt to introduce public LTC insurance into our healthcare system. The AI benefit was based on an assessment of the needs of older people and those with disabilities using a disability scale (SMAF) and case-mix classification system (Iso-SMAF Profiles). Under the plan, the benefit would be used to fund public institutions or purchase services from private organizations. Case managers were responsible for assessments and helping users and their families plan services and decide how to use the AI benefit. Funding AI was based on general tax revenues without capitalized funding, under a separate protected budget program. Projections were made for the additional budget needed to support AI, which would have mitigated the forecast increase in LTC spending due to population aging. All the legal, administrative, funding, training and contractual issues were dealt with, for implementation of the plan in April 2015. Unfortunately, the project was still-born for political reasons, but it demonstrates the feasibility of this essential innovation for Canada.
Status of Goldstone solar energy system study of the first Goldstone energy project
NASA Technical Reports Server (NTRS)
Lansing, F. L.
1977-01-01
The results reached by the DSN engineering section and private consultants in the review of the initial plan of the Golstone Energy Project are summarized. The main objectives were in the areas of energy conservation and the application of solar-driven systems for power and hydrogen generation. This summary will provide background data for management planning decisions both to the DSN engineering section and other organizations planning a similar program. The review showed that an add-on solar driven absorption refrigeration unit with its associated changes to the existing system was not cost-effective, having a payback period of 29 years. Similar economically unattractive results were found for both a solar-hydrogen and a wind-hydrogen generation plant. However, cutting the hydrogen generation linkage from this plant improved its economic feasibility.
40 CFR 35.2015 - State priority system and project priority list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... achieve optimum water quality management consistent with the goals and requirements of the Act. All..., needs and priorities set forth in areawide water quality management plans, and any other factors... priority to projects in priority water quality areas. The priority system may also include the...
Kansas State University Libraries' OCR Labeling Project.
ERIC Educational Resources Information Center
Thierer, Joyce; Bower, Merry
This publication describes the planning and implementation of an optical character recognition (OCR) labeling project, the first stage of Kansas State University (KSU) Libraries' program of conversion from a manual to an automated circulation system. It is noted that a telephone survey of libraries with automated circulation systems and…
Scenarios and decisionmaking for complex environmental systems
Stephen R. Carpenter; Adena R. Rissman
2012-01-01
Scenarios are used for expanding the scope of imaginable outcomes considered by assessments, planning exercises, or research projects on social-ecological systems. We discuss a global case study, the Millennium Ecosystem Assessment, and a regional project for an urbanizing agricultural watershed. Qualitative and quantitative aspects of scenarios are complementary....
A Three Cohort Study of Role-Play Instruction for Agile Project Management
ERIC Educational Resources Information Center
Schmitz, Kurt
2018-01-01
Agile Project Management methods and processes that emphasize action and feedback over planning continue to gain prominence for Information Systems projects. This topic is an ideal candidate to lead the evolution of project management instruction from teaching "about" to learning "how to." This paper describes a role-play…
Project HOLD: A Secondary Learning Disability Project.
ERIC Educational Resources Information Center
Snyder, Marjorie Sims
This document discusses Project HOLD, a Title VI-G Child Service Demonstration Center which was established as a cooperative effort between Northeast Louisiana University and the Ouachita Parish School System. The primary purpose of the project is to plan, explore, implement, and refine a program for students in grades 7 through 12 who have been…
Developing integrated parametric planning models for budgeting and managing complex projects
NASA Technical Reports Server (NTRS)
Etnyre, Vance A.; Black, Ken U.
1988-01-01
The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.
Real-time operating system for selected Intel processors
NASA Technical Reports Server (NTRS)
Pool, W. R.
1980-01-01
The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.
DOT National Transportation Integrated Search
2011-03-01
This project addressed several aspects of the LOSPLAN software, primarily with respect to incorporating : new FDOT and NCHRP research project results. In addition, some existing computational methodology : aspects were refined to provide more accurat...
Mir, Ali Mohammad; Shaikh, Gul Rashida
2013-01-01
ABSTRACT A USAID-sponsored family planning project called “FALAH” (Family Advancement for Life and Health), implemented in 20 districts of Pakistan, aimed to lower unmet need for family planning by improving access to services. To enhance the quality of care offered by the public health system, the FALAH project trained 10,534 facility-based health care providers, managers, and medical college faculty members to offer client-centered family planning services, which included a module to explain the Islamic viewpoint on family planning developed through an iterative process involving religious scholars and public health experts. At the end of the FALAH project, we conducted a situation analysis of health facilities including interviews with providers to measure family planning knowledge of trained and untrained providers; interviewed faculty to obtain their feedback about the training module; and measured changes in women's contraceptive use through baseline and endline surveys. Trained providers had a better understanding of family planning concepts than untrained providers. In addition, discussions with trained providers indicated that the training module on Islam and family planning helped them to become advocates for family planning. Faculty indicated that the module enhanced their confidence about the topic of family planning and Islam, making it easier to introduce and discuss the issue with their students. Over the 3.5-year project period, which included several components in addition to the training activity, we found an overall increase of 9 percentage points in contraceptive prevalence in the project implementation districts—from 29% to 38%. The Islam and family planning module has now been included in the teaching program of major public-sector medical universities and the Regional Training Institutes of the Population Welfare Department. Other countries with sizeable Muslim populations and low contraceptive prevalence could benefit from this module. PMID:25276535
Kamalov, R Kh; Pavlovskiĭ, L N
2005-12-01
A private stomatology clinics (institution) can not operate in market system of management with benefit without clear guiding lines and a real business plan. Entrepreneurs meet many different issues during organizing stomatology business, as follows: what categories of population will address to the clinics, what financial resources an entrepreneur we need to realize a project, does the project justify itself economically etc? A business plan is created to answer the questions mentioned above. The article considers essence, goals, formation of information field and general methodology of the development of a business plan for stomatology institutions.
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-16
... (CAISO) proposed Revised Transmission Planning Process (RTPP).\\1\\ Take notice that such conference will... California Transmission Planning Group, and complies with the transmission planning principles of Order No. 890; How the various categories of transmission projects will be defined and differentiated; To what...
14 CFR 152.325 - Financial status report: Airport planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Financial status report: Airport planning... agency conducting a project for airport system planning shall submit a financial status report on a form... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial...
Project Mapping to Build Capacity and Demonstrate Impact in the Earth Sciences
NASA Astrophysics Data System (ADS)
Hemmings, S. N.; Searby, N. D.; Murphy, K. J.; Mataya, C. J.; Crepps, G.; Clayton, A.; Stevens, C. L.
2017-12-01
Diverse organizations are increasingly using project mapping to communicate location-based information about their activities. NASA's Earth Science Division (ESD), through the Earth Science Data Systems and Applied Sciences' Capacity Building Program (CBP), has created a geographic information system of all ESD projects to support internal program management for the agency. The CBP's NASA DEVELOP program has built an interactive mapping tool to support capacity building for the program's varied constituents. This presentation will explore the types of programmatic opportunities provided by a geographic approach to management, communication, and strategic planning. We will also discuss the various external benefits that mapping supports and that build capacity in the Earth sciences. These include activities such as project matching (location-focused synergies), portfolio planning, inter- and intra-organizational collaboration, science diplomacy, and basic impact analysis.
1990-03-01
rare in Missouri. The record is from 1987. Red berried elder ( Sambucus pubens) occurs within 1.0 miles of the project area. This plant is endangered...hIALLARD IYPIACTS AAHU’x r U rr PLAN Figure 1- Plan Comparisons A-19 Note that Plan C (sediment deflection) would provide essentially no benefits to...S TA.T$ OIL UTAILS jfy 9.LE.CTtICA.l. 0 BasMW6 WORN Mfaiss wo1nu SYSTEM ,mW30mmoRALummAnuGiWEN PinOain =1~ POOL sIKIrval wLI $11 t PLATE I 44 D ~SAY8
The Physical/Chemical Closed-Loop Life Support Research Project
NASA Technical Reports Server (NTRS)
Bilardo, Vincent J., Jr.
1990-01-01
The various elements of the Physical/Chemical Closed-Loop Life Support Research Project (P/C CLLS) are described including both those currently funded and those planned for implementation at ARC and other participating NASA field centers. The plan addresses the entire range of regenerative life support for Space Exploration Initiative mission needs, and focuses initially on achieving technology readiness for the Initial Lunar Outpost by 1995-97. Project elements include water reclamation, air revitalization, solid waste management, thermal and systems control, and systems integration. Current analysis estimates that each occupant of a space habitat will require a total of 32 kg/day of supplies to live and operate comfortably, while an ideal P/C CLLS system capable of 100 percent reclamation of air and water, but excluding recycling of solid wastes or foods, will reduce this requirement to 3.4 kg/day.
Status, Plans and Initial Results for Ares I Crew Launch Vehicle Aerodynamics
NASA Technical Reports Server (NTRS)
Huebner, Lawrence D.; Hall, Robert M.; Haynes, Davy A.; Pamadi, Bandu N.; Taylor, Terry L.; Seaford, C. Mark
2008-01-01
Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Ares Projects Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented. Keywords: Ares I Crew Launch Vehicle, aerodynamics, wind tunnel testing, computational fluid dynamics
ERIC Educational Resources Information Center
Sullivan, Linda; Bozeman, William
2010-01-01
Enterprise Resource Planning (ERP) systems can represent one of the largest investments of human and financial resources by a higher education institution. They also bring a significant process reengineering aspect to the institution and the associated implementation project through the integration of compiled industry best practices into the…
USL/DBMS NASA/PC R and D project system testing standards
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin
1984-01-01
A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.
Learning from the implementation of inter-organisational web-based care planning and coordination.
Walker, Rae; Blacker, Vivian; Pandita, Linda; Close, Jacky; Mason, Wendy; Watson, Julie
2013-01-01
In Victoria, despite strong policy support, e-care planning and coordination is poorly developed. The action research project discussed here was developed to overcome organisational and worker-level barriers to change. The project outcomes highlighted the need for work on the building blocks of e-care coordination that enhance workers' knowledge and skills, and provide permission and support for appropriate collaborative system and services coordination practices.
Learning On-Line from a Few Examples
2009-08-31
Understanding the Brain. August 2008 TERRA ACTUALIDAD - INTERNACIONAL - Tecnalia desarrolla en Massachussets la tesis doctoral de una investigadora...with a hierarchical architecture similar to the cortex. A Brief History of the Projects We started the project with the plan of a) extending...of the person’s face speaking an arbitrary segment of somebody else’s speech, even in another language. We had planned to extend the system to
Building Excellence in Project Execution: Integrated Project Management
2015-04-30
challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as
Aligning Strategic and Information Systems Planning: A Review of Navy Efforts
1990-03-01
plans." [Ref. 11:p. 6] The results of the component level IR planning process are documented in Component Information Management Plans ( CIMP ). In mid...August, the CIMP’s are presented to the IR Planning Committee at the annual IR Planning Conference. Each CIMP is then distributed to all organizations...objectives promulgated in the CIMP or FASP will, if approved for development or acquisition, be further refined in project plans, which in turn, form the
DOT National Transportation Integrated Search
2014-03-01
Streamlined project delivery is a federally : mandated goal that the Texas Department of : Transportation (TxDOT) leadership supports to : achieve a more efficient and effective : transportation system in Texas. : Federal and state transportation pla...
Energy-Water System Solutions | Energy Analysis | NREL
simultaneously. Example Projects Energy, water, and renewable opportunities assessment at Bagram Air Force Base opportunity to plan integrated infrastructure. Example Projects Identification of critical water and campus-level opportunities. Example Projects Net Zero Energy-Water-Waste analysis for Fort Carson Net
Code of Federal Regulations, 2014 CFR
2014-01-01
... board of directors and the manager to guide the system towards its financial goals. (b) A borrower must... in support of a loan application shall include: (1) The projected results of future actions planned... DSC; (5) Current and projected cash flows; (6) Projections of future borrowings and the associated...
Code of Federal Regulations, 2012 CFR
2012-01-01
... forecast. The forecast should be used by the board of directors and the manager to guide the system towards... projected results of future actions planned by the borrower's board of directors; (2) The financial goals... type of large power loads, projections of future borrowings and the associated interest, projected...
Code of Federal Regulations, 2013 CFR
2013-01-01
... forecast. The forecast should be used by the board of directors and the manager to guide the system towards... projected results of future actions planned by the borrower's board of directors; (2) The financial goals... type of large power loads, projections of future borrowings and the associated interest, projected...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuohy, Aidan; Smith, Jeff; Rylander, Matt
2016-07-11
Increasing levels of distributed and utility scale Solar Photovoltaics (PV) will have an impact on many utility functions, including distribution system operations, bulk system performance, business models and scheduling of generation. In this project, EPRI worked with Southern Company Services and its affiliates and the Tennessee Valley Authority to assist these utilities in their strategic planning efforts for integrating PV, based on modeling, simulation and analysis using a set of innovative tools. Advanced production simulation models were used to investigate operating reserve requirements. To leverage existing work and datasets, this last task was carried out on the California system. Overall,more » the project resulted in providing useful information to both of the utilities involved and through the final reports and interactions during the project. The results from this project can be used to inform the industry about new and improved methodologies for understanding solar PV penetration, and will influence ongoing and future research. This report summarizes each of the topics investigated over the 2.5-year project period.« less
The health systems agency: a new bureaucracy.
Meredith, S; Meredith, G
1977-07-01
A Federal law signed by President Ford in 1975 (PL 93-641) mandates the establishment of Health Systems Agencies across the country. The major intent of the law is to provide local direction and control of health care planning. Each Agency shall have a professional staff under the aegis of a board of directors composed of a majority of consumers and a minority of providers. Data identifying health care needs shall be translated into a Health Systems Plan, which is a statement of goals for each Agency; an Annual Implementation Plan shall be developed as a statement of objectives, projects, and strategies requisite to achieving the Health Systems Plan. The concept of the Health Systems Agency has correlate state and federal bureaucratic strata to facilitate health care planning coordination.
Developing a Campaign Plan to Target Centers of Gravity Within Economic Systems
1995-05-01
Conclusion 67 CHAPTER 7: CURRENT AND FUTURE CONCERNS 69 Decision Making and Planning 69 Conclusion 72 CHAPTER 8: CONCLUSION 73 APPENDIX A: STATISTICS 80...Terminology and Statistical Tests 80 Country Analysis 84 APPENDIX B 154 BIBLIOGRAPHY 157 VITAE 162 IV LIST OF FIGURES Figure 1. Air Campaign...This project furthers the original statistical effort and adds to this a campaign planning approach (including both systems and operational level
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curry, Judith
This project addressed the challenge of providing weather and climate information to support the operation, management and planning for wind-energy systems. The need for forecast information is extending to longer projection windows with increasing penetration of wind power into the grid and also with diminishing reserve margins to meet peak loads during significant weather events. Maintenance planning and natural gas trading is being influenced increasingly by anticipation of wind generation on timescales of weeks to months. Future scenarios on decadal time scales are needed to support assessment of wind farm siting, government planning, long-term wind purchase agreements and the regulatorymore » environment. The challenge of making wind forecasts on these longer time scales is associated with a wide range of uncertainties in general circulation and regional climate models that make them unsuitable for direct use in the design and planning of wind-energy systems. To address this challenge, CFAN has developed a hybrid statistical/dynamical forecasting scheme for delivering probabilistic forecasts on time scales from one day to seven months using what is arguably the best forecasting system in the world (European Centre for Medium Range Weather Forecasting, ECMWF). The project also provided a framework to assess future wind power through developing scenarios of interannual to decadal climate variability and change. The Phase II research has successfully developed an operational wind power forecasting system for the U.S., which is being extended to Europe and possibly Asia.« less
South Florida freight advanced traveler information system.
DOT National Transportation Integrated Search
2013-10-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the South Florida FRATIS Demonstration Project. More specifically, this document provides: Plan...
Searching for Planning and Design Solutions.
ERIC Educational Resources Information Center
Roark, Steven
2001-01-01
Presents the fourth article in a series on the Longview Community College (Kansas City, Missouri) Liberal Arts building project. How architects are revising floor plans, evaluating building systems, deciding on furniture, and dealing with building codes are discussed. (GR)
Desert Peak East Enhanced Geothermal Systems (EGS) Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zemach, Ezra; Drakos, Peter; Spielman, Paul
2013-09-30
This manuscript is a draft to replaced with a final version at a later date TBD. A summary of activities pertaining to the Desert Peak EGS project including the planning and resulting stimulation activities.
FHWA Federal-Aid ITS Procurement Regulations and Contracting Options
DOT National Transportation Integrated Search
1997-10-01
State and local agencies planning to procure Intelligent Transportation Systems (ITS) projects with Federal highway funds face unique challenges. They must choose appropriate contracting techniques that optimize project quality and cost while meeting...
The ZOG Technology Demonstration Project: A System Evaluation of USS CARL VINSON (CVN 70)
1984-12-01
part of a larger project involving development of a wide range of computer technologies, including artifcial intelligence and a long-range computer...shipboard manage- ment, aircraft management, expert systems, menu selection, man- machine interface, artificial intelligence , automation; shipboard It AWM...functions, planning, evaluation, training, hierarchical data bases The objective of this project was to conduct an evaluation of ZOG, a general purpose
POLARIS: Helping Managers Get Answers Fast!
NASA Technical Reports Server (NTRS)
Corcoran, Patricia M.; Webster, Jeffery
2007-01-01
This viewgraph presentation reviews the Project Online Library and Resource Information System (POLARIS) system. It is NASA-wide, web-based system, providing access to information related to Program and Project Management. It will provide a one-stop shop for access to: a searchable, sortable database of all requirements for all product lines, project life cycle diagrams with reviews, project life cycle diagrams with reviews, project review definitions with products review information from NPR 7123.1, NASA Systems Engineering Processes and Requirements, templates and examples of products, project standard WBSs with dictionaries, and requirements for implementation and approval, information from NASA s Metadata Manager (MdM): Attributes of Missions, Themes, Programs & Projects, NPR7120.5 waiver form and instructions and much more. The presentation reviews the plans and timelines for future revisions and modifications.
Projects without a purpose: Why a top down strategy to resilience matters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kingery, Kristine M.; Fowler, Kimberly M.; Harrove
Energy resilience is a key focus of the current administration and Department of Defense (DoD) leaders, and is in the title of every energy conference session. Most case studies and success stories focus on resilience projects hardening systems or microgriding critical infrastructure. Some case studies focus on unique financing approaches to bring private sector innovation and increased investment to military installations. Many times, what initially look like innovative resilience projects, end as isolated systems or stranded infrastructure. This article will explore how the DoD can make greater strides advancing resilience objectives and ultimately developing projects that support installation mission readinessmore » by first focusing on top down strategies. The Army established energy and water security/resilience requirements, developed a comprehensive measurement framework, is evolving integrated planning approaches in collaboration with local communities, and is supporting project development activities across third-party and appropriated programs. The Army’s multi-year strategic energy and water security planning activities can provide helpful guidance to both the lifecycle of programs or individual projects, and ensure resilience projects both have and achieve a purpose.« less
Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics
NASA Technical Reports Server (NTRS)
Huebner, Lawrence D.; Haynes, Davy A.; Taylor, Terry L.; Hall, Robert M.; Pamadi, Bandu N.; Seaford, C. Mark
2006-01-01
Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.
Tunisia Renewable Energy Project systems description report
NASA Technical Reports Server (NTRS)
Scudder, L. R.; Martz, J. E.; Ratajczak, A. F.
1986-01-01
In 1979, the Agency for International Development (AID) initiated a renewable energy project with the Government of Tunisia to develop an institutional capability to plan and institute renewable energy technologies in a rural area. The specific objective of the district energy applications subproject was to demonstrate solar and wind energy systems in a rural village setting. The NASA Lewis Research Center was asked by the AID Near East Bureau to manage and implement this subproject. This report describes the project and gives detailed desciptions of the various systems.
Life-Long Cyberlearning System: A Pilot Project for the "Learning Society" in the ROC.
ERIC Educational Resources Information Center
Han, Huei-Wen; Wang, Yen-Chao
1999-01-01
Provides an overview of the implementation of lifelong learning in Taiwan, Republic of China (ROC) as part of its educational reform policy and describes a pilot project, the Lifelong Cyberlearning System. Highlights include planning architecture, Web-based learning technology, professional education, industrial and corporate assistance, and…
The Virtual Factory Teaching System (VFTS): Project Review and Results.
ERIC Educational Resources Information Center
Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.
This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…
45 CFR 205.35 - Mechanized claims processing and information retrieval systems; definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... software and hardware used: (1) To introduce, control and account for data items in providing public... undertaken, and the resources required to complete the project; (2) The preparation of an APD; (3) The preparation of a detailed project plan describing when and how the computer system will be designed and...
ERIC Educational Resources Information Center
Woodward, Belle S.; Sendall, Patricia; Ceccucci, Wendy
2010-01-01
Contemporary Information Systems graduates will be more marketable in the workplace upon graduation if they have combined competencies in both technical and soft skills: interpersonal communication, teamwork, time management, planning and organizational skills. Team and project-based learning can be used to incorporate soft skill competencies with…
NASA Astrophysics Data System (ADS)
Zeng, Yajun; Skibniewski, Miroslaw J.
2013-08-01
Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.
Tailoring Small IT Projects in the Project Planning Phase
ERIC Educational Resources Information Center
Mulhearn, Michael F.
2011-01-01
Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…
Interagency Planning and Support Project. Final Report.
ERIC Educational Resources Information Center
Salisbury, Christine
This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…
The Adolescent Smoking and Health Project.
ERIC Educational Resources Information Center
Sutherland, Mary; And Others
This project was designed to specifically apply a health planning management system to a school based health education risk reduction program. Additionally, the Adolescent Smoking and Alcohol Project assisted youth in making informed decisions about the use/abuse of alcohol and cigarettes. Program components included a related knowledge base;…
Corriero, Rosemary; Redmon, Ginger
Before participating in a project funded by the Centers for Disease Control and Prevention, most state and local health departments (LHDs) were not seeking reimbursement or being fully reimbursed by insurance plans for the cost of immunization services (including vaccine costs and administration fees) they provided to insured patients. Centers for Disease Control and Prevention's Billables Project was designed to enable state and LHDs to bill public and private insurance plans for immunization services provided to insured patients. Identify and describe key barriers state and LHDs may encounter while planning and implementing a billing program, as well as possible solutions for overcoming those barriers. This study used reports from Billables Project participants to explore barriers they encountered when planning and implementing a billing program and steps taken to address those barriers. Thirty-eight state immunization programs. Based on project participants' reports, barriers were noted in 7 categories: (1) funding and costs, (2) staff, (3) health department characteristics, (4) third-party payers and insurance plans, (5) software, (6) patient insurance status, and (7) other barriers. Possible solutions for overcoming those barriers included hiring or seeking external help, creating billing guides and training modules, streamlining workflows, and modifying existing software systems. Overcoming barriers during planning and implementation of a billing program can be challenging for state and LHDs, but the experiences and suggestions of past Billables Project participants can help guide future billing program efforts.
Design, implementation and migration of security systems as an extreme project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scharmer, Carol; Trujillo, David
2010-08-01
Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocatedmore » based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.« less
Design implementation and migration of security systems as an extreme project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scharmer, Carol
2010-10-01
Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocatedmore » based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.« less
Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach
NASA Technical Reports Server (NTRS)
Jacobs, Derya, A.; Aasen, Curtis A.
2000-01-01
Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, Jack C.P., E-mail: cejcheng@ust.hk; Ma, Lauren Y.H., E-mail: yingzi@ust.hk
Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R wastemore » disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.« less
Advanced Life Support Project Plan
NASA Technical Reports Server (NTRS)
2002-01-01
Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.
Artificial intelligence - New tools for aerospace project managers
NASA Technical Reports Server (NTRS)
Moja, D. C.
1985-01-01
Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.
Key Questions in Building Defect Prediction Models in Practice
NASA Astrophysics Data System (ADS)
Ramler, Rudolf; Wolfmaier, Klaus; Stauder, Erwin; Kossak, Felix; Natschläger, Thomas
The information about which modules of a future version of a software system are defect-prone is a valuable planning aid for quality managers and testers. Defect prediction promises to indicate these defect-prone modules. However, constructing effective defect prediction models in an industrial setting involves a number of key questions. In this paper we discuss ten key questions identified in context of establishing defect prediction in a large software development project. Seven consecutive versions of the software system have been used to construct and validate defect prediction models for system test planning. Furthermore, the paper presents initial empirical results from the studied project and, by this means, contributes answers to the identified questions.
Whittenburg, Luann; Meetim, Aunchisa
2016-01-01
An innovative nursing documentation project conducted at Bumrungrad International Hospital in Bangkok, Thailand demonstrated patient care continuity between nursing patient assessments and nursing Plans of Care using the Clinical Care Classification System (CCC). The project developed a new generation of interactive nursing Plans of Care using the six steps of the American Nurses Association (ANA) Nursing process and the MEDCIN® clinical knowledgebase to present CCC coded concepts as a natural by-product of a nurse's documentation process. The MEDCIN® clinical knowledgebase is a standardized point-of-care terminology intended for use in electronic health record systems. The CCC is an ANA recognized nursing terminology.
Using Sequence Diagrams to Detect Communication Problems Between Systems
NASA Technical Reports Server (NTRS)
Lindvall, Mikael; Ackermann, Chris; Stratton, William C.; Sibol, Deane E.; Ray, Arnab; Yonkwa, Lyly; Kresser, Jan; Godfrey, Sally H.; Knodel, Jens
2008-01-01
Many software systems are evolving complex system of systems (SoS) for which inter-system communication is both mission-critical and error-prone. Such communication problems ideally would be detected before deployment. In a NASA-supported Software Assurance Research Program (SARP) project, we are researching a new approach addressing such problems. In this paper, we show that problems in the communication between two systems can be detected by using sequence diagrams to model the planned communication and by comparing the planned sequence to the actual sequence. We identify different kinds of problems that can be addressed by modeling the planned sequence using different level of abstractions.
ERIC Educational Resources Information Center
Taylor, Beverly Loy
This guide, one of four, is a product of the Project on Social Architecture in Education, initiated to find out what it takes to develop a program and a working social system for a new school. The project began with interviews with school planners and consultants, then moved to the study of six new innovative public schools for a two-and-a-half…
Goverman, I L
1994-11-01
Group Health Cooperative of Puget Sound (GHC), a large staff-model health maintenance organization based in Seattle, is redesigning its information systems to provide the systems and information needed to support its quality agenda. Long-range planning for GHC's information resources was done in three phases. In assessment, interviews, surveys, and a benchmarking effort identified strengths and weaknesses of the existing information systems. We concluded that we needed to improve clinical care and patient management systems and enhance health plan applications. In direction setting, we developed six objectives (for example, approach information systems in a way that is consistent with quality improvement principles). Detailed planning was used to define projects, timing, and resource allocations. Some of the most important efforts in the resulting five-year plan include the development of (1) a computerized patient record; (2) a provider-based clinical workstation for access to patient information, order entry, results reporting, guidelines, and reminders; (3) a comprehensive set of patient management and service quality systems; (4) reengineered structures, policies, and processes within the health plan, supported by a complete set of integrated information systems; (5) a standardized, high-capacity communications network to provide linkages both within GHC and among its business partners; and (6) a revised oversight structure for information services, which forms partnerships with users. A quality focus ensured that each project not only produced its own benefits but also supported the larger organizational goals associated with "total" quality.
ERIC Educational Resources Information Center
McKinlay, Bruce; Adams, Daniel
The Occupational Information Access System (OIAS) improves the accessibility of occupational labor market information for career planning. Its operation at Churchill High School is evaluated from several angels: the likes and dislikes of users; the effect of OIAS on users' knowledge of occupational information and on their career plans; why other…
Seaberg, R C; Statland, B E; Stallone, R O
1999-06-01
Lab automation and consolidation can be a daunting, risky, major reengineering project. Done right, it can mean decreased labor costs and space requirements, increased test volume, and more efficient use of personnel. See how this health system got the job done using a carefully defined, seven-step plan.
Planning for climate change on the National Wildlife Refuge System
B. Czech; S. Covington; T. M. Crimmins; J. A. Ericson; C. Flather; M. Gale; K. Gerst; M. Higgins; M. Kaib; E. Marino; T. Moran; J. Morton; N. Niemuth; H. Peckett; D. Savignano; L. Saperstein; S. Skorupa; E. Wagener; B. Wilen; B. Wolfe
2014-01-01
This document originated in 2008 as a collaborative project of the U.S. Fish and Wildlife Service (FWS) and the University of Maryland's Graduate Program in Sustainable Development and Conservation Biology. The original title was A Primer on Climate Change for the National Wildlife Refuge System. The Primer has evolved into Planning for Climate Change on the...
McCabe, O Lee; Perry, Charlene; Azur, Melissa; Taylor, Henry G; Gwon, Howard; Mosley, Adrian; Semon, Natalie; Links, Jonathan M
2013-02-01
Community disaster preparedness plans, particularly those with content that would mitigate the effects of psychological trauma on vulnerable rural populations, are often nonexistent or underdeveloped. The purpose of the study was to develop and evaluate a model of disaster mental health preparedness planning involving a partnership among three, key stakeholders in the public health system. A one-group, post-test, quasi-experimental design was used to assess outcomes as a function of an intervention designated Guided Preparedness Planning (GPP). The setting was the eastern-, northern-, and mid-shore region of the state of Maryland. Partner participants were four local health departments (LHDs), 100 faith-based organizations (FBOs), and one academic health center (AHC)-the latter, collaborating entities of the Johns Hopkins University and the Johns Hopkins Health System. Individual participants were 178 community residents recruited from counties of the above-referenced geographic area. Effectiveness of GPP was based on post-intervention assessments of trainee knowledge, skills, and attitudes supportive of community disaster mental health planning. Inferences about the practicability (feasibility) of the model were drawn from pre-defined criteria for partner readiness, willingness, and ability to participate in the project. Additional aims of the study were to determine if LHD leaders would be willing and able to generate post-project strategies to perpetuate project-initiated government/faith planning alliances (sustainability), and to develop portable methods and materials to enhance model application and impact in other health jurisdictions (scalability). The majority (95%) of the 178 lay citizens receiving the GPP intervention and submitting complete evaluations reported that planning-supportive objectives had been achieved. Moreover, all criteria for inferring model feasibility, sustainability, and scalability were met. Within the span of a six-month period, LHDs, FBOs, and AHCs can work effectively to plan, implement, and evaluate what appears to be an effective, practical, and durable model of capacity building for public mental health emergency planning.
Reuse of heat energy in wastewater: implementation examples in Japan.
Funamizu, N; Iida, M; Sakakura, Y; Takakuwa, T
2001-01-01
Sewage and treated water can be a heat source in urban area due to large heat capacity, thus recovery and reuse of its energy is one of the most desirable plans for the sewerage system. In this paper, characteristics of heat energy in wastewater, reuse plans, and some experiences in Japan are presented. Full-scale reuse projects for heating and cooling in the Tokyo Metropolitan Districts and project for melting snow in Sapporo City are discussed. The key factors found in experience of Tokyo were setting the heat pumps near the demand points and the technical developments of equipment to prevent system from clogging, corrosion, and decrease in the heat transfer efficiency. It was also found through the project for melting snow in Sapporo that the key factor in public acceptance was the multi-purpose use of the sewerage system both for melting snow in winter and retaining rain water in summer.
ALARA database value in future outage work planning and dose management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, D.W.; Green, W.H.
1995-03-01
ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in themore » categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.« less
Air transportation noise technology overview
NASA Technical Reports Server (NTRS)
Maggin, B.; Chestnutt, D.
1973-01-01
The NASA and DOT technology program planning for quieter air transportation systems is reviewed. To put this planning in context, the nature of the noise problem and the projected nature of the air transportation fleet are identified. The technology program planning reviewed here is discussed in relation to the following areas of activity: systems analysis, community acceptance, basic research and technology, and the various classes of civil aircraft, i.e. existing and advanced transports, powered-lift transports, and general aviation.
Bush, Peter W.
1986-01-01
The Edwards-Trinity regional aquifer-system analysis project, begun in October 1985 and scheduled to be completed by October 1991, is one of a series of similar projects being conducted nationwide. The project is intended to define the hydrogeologic framework, and to describe the geochemistry and groundwater flow of the aquifer system in order to provide a better understanding of the system's long-term water-yielding potential. A multidisciplinary approach will be used in which computer-based digital simulation of flow in the system will be the principal method of hydrogeologic investigation.
ERIC Educational Resources Information Center
Xu, Hongjiang; Rondeau, Patrick J.; Mahenthiran, Sakthi
2011-01-01
Enterprise Resource Planning (ERP) system implementation projects are notoriously risky. While large-scale ERP cases continue to be developed, relatively few new ERP cases have been published that further ERP implementation education in small to medium size firms. This case details the implementation of a new ERP system in a medium sized…
1983-09-01
Science, Art, or Witchcraft ?" which summarizes the state of the art and describes some important issues in planning level estimates in water resources...REPORT: AD#: P1o 902 TITLE:Panning Level Cost Estimating--Science, Art, or Witchcraft . P01 903 Planning Water Supply Projects: The Systems Estimate...OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 PLANNING LEVEL COST ESTIMATING--SCIENCE, ART, OR WITCHCRAFT by * PLANNING WATER
NASA Astrophysics Data System (ADS)
Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.
2017-08-01
In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.
The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; themore » importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.« less
[Integration of the radiotherapy irradiation planning in the digital workflow].
Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E
2013-02-01
At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.
Fuchs, L; Beeneken, T
2005-01-01
The paper describes the realization of a real-time control for the Vienna sewer system. The project is scheduled for completion for 2004. The 3.5 year project comprises all planning stages starting with the recording of data up to the planning of measuring and controlling units. The concrete steps of the planning stages are explained. A measuring system including 25 rainfall measurements, 40 flow measurements and 20 water level measurements is implemented as an online system. This measuring system is designed to achieve two objectives, on the one hand the real-time control and on the other hand the calibration of the model that is used for the hydrodynamic sewer system simulation. The approx. 53,000 pipes have served to generate a coarse network of no more than approx. 2600 pipes. The area data were derived with high accuracy from available aerial photograph interpretations. With simulation runs of a rule-based control software the system operation was examined. A self-learning system will improve the rule basis. A forecasting model that uses weather observation radar will additionally influence the controlling decisions. The findings from the investigations are immediately considered in the planning of measuring and control units. The simulated results for the first phase of implementation, which demonstrate the benefit of RTC for the Vienna sewer system, are explained.
Test development for the thermionic system evaluation test (TSET) project
NASA Astrophysics Data System (ADS)
Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.
1992-01-01
The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.
A collaborative virtual reality environment for neurosurgical planning and training.
Kockro, Ralf A; Stadie, Axel; Schwandt, Eike; Reisch, Robert; Charalampaki, Cleopatra; Ng, Ivan; Yeo, Tseng Tsai; Hwang, Peter; Serra, Luis; Perneczky, Axel
2007-11-01
We have developed a highly interactive virtual environment that enables collaborative examination of stereoscopic three-dimensional (3-D) medical imaging data for planning, discussing, or teaching neurosurgical approaches and strategies. The system consists of an interactive console with which the user manipulates 3-D data using hand-held and tracked devices within a 3-D virtual workspace and a stereoscopic projection system. The projection system displays the 3-D data on a large screen while the user is working with it. This setup allows users to interact intuitively with complex 3-D data while sharing this information with a larger audience. We have been using this system on a routine clinical basis and during neurosurgical training courses to collaboratively plan and discuss neurosurgical procedures with 3-D reconstructions of patient-specific magnetic resonance and computed tomographic imaging data or with a virtual model of the temporal bone. Working collaboratively with the 3-D information of a large, interactive, stereoscopic projection provides an unambiguous way to analyze and understand the anatomic spatial relationships of different surgical corridors. In our experience, the system creates a unique forum for open and precise discussion of neurosurgical approaches. We believe the system provides a highly effective way to work with 3-D data in a group, and it significantly enhances teaching of neurosurgical anatomy and operative strategies.
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
Terminal location planning in intermodal transportation with Bayesian inference method.
DOT National Transportation Integrated Search
2014-01-01
In this project, we consider the planning of terminal locations for intermodal transportation systems. For a given number of potential terminals and coexisted multiple service pairs, we find the set of appropriate terminals and their locations that p...
Robustness in practice--the regional planning of health services.
Best, G; Parston, G; Rosenhead, J
1986-05-01
Earlier work has criticized the dominant tendencies in operational research contributions to health services planning as characterized by optimization, implausible demands for data, depoliticization, hierarchy and inflexibility. This paper describes an effort which avoids at least some of these pitfalls. The project was to construct a planning system for a regional health council in Ontario, Canada, which would take account of the possible alternative future states of the health-care system's environment and would aim to keep options for future development open. The planning system devised is described in the paper. It is based on robustness analysis, which evaluates alternative initial action sets in terms of the useful flexibility they preserve. Other features include the explicit incorporation of pressures for change generated outside the health-care system, and a satisficing approach to the identification of both initial action sets and alternative future configurations of the health-care system. It was found possible to borrow and radically 're-use' techniques or formulations from the mainstream of O.R. contributions. Thus the 'reference projection' method was used to identify inadequacies in performance which future health-care system configurations must repair. And Delphi analysis, normally a method for generating consensus, was used in conjunction with cluster analysis of responses to generate meaningfully different alternative futures.
7 CFR 4280.161 - Direct Loan Process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Renewable Energy Systems and Energy... available for direct loans; (2) Applicant and project eligibility criteria; (3) Minimum and maximum loan...; (11) Construction planning and performing development; (12) Requirements after project construction...
Oregon Green Light CVO evaluation : final report : executive summary
DOT National Transportation Integrated Search
2001-04-01
This report summarizes the findings of all of the Detailed Test Plans conducted for the evaluation of the Oregon Green Light Commercial Vehicle Operations (CVO) project. This project was responsible for the installation of 21 systems containing weigh...
KY-CTDS : Kentucky contract time determination system
DOT National Transportation Integrated Search
2000-06-30
This research project was to update the KyTC's planning tool used for the determination of contract time allotted for contractors to complete highway construction projects in the Commonwealth of Kentucky. Although this issue was initially raised by t...
Abilene Metropolitan Area Transportation Improvement Program Fiscal Years 1996-1998
DOT National Transportation Integrated Search
1995-11-30
This document contains a prioritized list of surface transportation improvement : projects which are expected to begin in the next three years. These projects are : planned to develop, improve, and maintain an integrated transportation system : for t...
System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2013-02-01
The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
The aggregate timberland assessment systemATLAS: a comprehensive timber projection model.
J.R. Mills; J.C. Kincaid
1992-01-01
The aggregate timberland assessment system is a time-based deterministic timber projection model. It was developed by the USDA Forest Service to address broad policy questions related to future timber supplies for the 1989 Renewable Resources Planning Act timber assessment. An open framework design allows for customizing inputs to account for regional and subregional...
Public Higher Education Enrollment Forecasting in the State of Ohio.
ERIC Educational Resources Information Center
Render, Barry
With the growing concern for the development of good mathematical education planning models, few states have developed the type of enrollment projection systems that they would consider to be ideal. The primary objectives of this research project were to develop, construct, and document an enrollment forecasting system for use by the Ohio Board of…
Evaluating User Participation and User Influence in an Enterprise System
ERIC Educational Resources Information Center
Gibbs, Martin D.
2010-01-01
Does user influence have an impact on the data quality of an information systems development project? What decision making should users have? How can users effectively be engaged in the process? What is success? User participation is considered to be a critical success factor for Enterprise Resource Planning (ERP) projects, yet there is little…
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barriermore » at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.« less
A contemporary view of systems engineering. [definition of system and discussion of systems approach
NASA Technical Reports Server (NTRS)
Miles, R. F., Jr.
1974-01-01
The concept of a 'system' is defined, and the 'systems approach' is discussed. Four contemporary examples of the systems approach are presented: an operations research project, the planning-programming-budgeting system, an information processing system, and aerospace programs.
Research Information Management: How the Library Can Contribute to the Campus Conversation
ERIC Educational Resources Information Center
Day, Annette
2018-01-01
This article describes a project undertaken as part of a cross-campus strategic planning effort. The project documented current campus practices and systems in use for collecting, analyzing and reporting key research metrics. The project identified organizational issues around siloed data collection and lack of clarity on data stewards, data…
A Study of Arizona Labor Market Demand Data for Vocational Education Planning.
ERIC Educational Resources Information Center
Gould, Albert W.; Manning, Doris E.
A study examined the project methodology used by the Bureau of Labor Statistics and the related projections made by the state employment security agencies. Findings from a literature review indicated that the system has steadily improved since 1979. Projections made from the Occupational Employment Statistics Surveys were remarkably accurate.…
Reengineering the project design process
NASA Astrophysics Data System (ADS)
Kane Casani, E.; Metzger, Robert M.
1995-01-01
In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-07-01
This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated inmore » the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.« less
Social and economic profile technical guide
David Seesholtz; Denise Wickwar; John C. Russell
2006-01-01
A social and economic profile is a key element of a social assessment. A social and economic assessment or profile is used by line officers, planning staff social scientists, and others to inform both forest planning activities and project-level work. It is important to discover how planning and management decisions made by National Forest System staff will affect...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
... turbines and associated facilities and access roads, maintenance of the wind turbines and associated... Area). The Plan Area is adjacent to existing energy-producing facilities, most notably wind turbine.../California Independent System Operator power grid. Up to 59 wind turbines would be built in the Plan Area...
2005-08-04
Dennis Mekkers and Daniel M. Katz Current Research in Fate Current Research in Fate & Transport of Chemical and Biological Contaminants in Water... Grafenwoehr Health/Dental Clinic 33U.S. Army Health Facility Planning Agency • $58M in Construction, $86M in Design • 23 Projects in Pipeline • HFPA...Troop Medical Clinic Grafenwoehr Health/Dental Clinic 38U.S. Army Health Facility Planning Agency Army “Medical BRAC” Projects Afghanistan -- CPT
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Neill, Barbara; Hurlbut, David; Pena, Ivonne
2016-06-01
Mexico's transition to a modern wholesale power market will place new demands on how regulators evaluate and approve transmission expansion projects. Transmission projects in a modern wholesale market fulfill one of several needs, and utilities, regional transmission organizations, and regulatory authorities in the United States have encountered comparable challenges in their market transitions to ensure projects meeting each type of need can be built. The purpose of this report is to open a window to view that experience. The report examines key practices of different U.S. jurisdictions that have moved from transmission planning to transmission approval, and it focuses onmore » the role of the regulator in supporting a planning process that equitably meets identified needs.« less
Cicchetti, A
1998-01-01
The innovations introduced in the Italian Health Care System by the legislative decrees No. 502/92 and 517/93 are remarkable, drawing on managerial methods and organizational structure of hospitals. To face this kind of change, in 1995 the "Policlinico A. Gemelli" prepared a five-year Strategic Plan that gave strategical lines and targets to be pursued. This plan has isolated 3 main strategical projects to be implemented with the participation of all medical and managerial professionals operating in the "Policlinico". The most complex project is that of the reengineering of management processes, we expect to end during 1998. The main target is to check the fundamental factors involved with the aim of achieving patient satisfaction as well as a cost-effective management.
Systems aspects of COBE science data compression
NASA Technical Reports Server (NTRS)
Freedman, I.; Boggess, E.; Seiler, E.
1993-01-01
A general approach to compression of diverse data from large scientific projects has been developed and this paper addresses the appropriate system and scientific constraints together with the algorithm development and test strategy. This framework has been implemented for the COsmic Background Explorer spacecraft (COBE) by retrofitting the existing VAS-based data management system with high-performance compression software permitting random access to the data. Algorithms which incorporate scientific knowledge and consume relatively few system resources are preferred over ad hoc methods. COBE exceeded its planned storage by a large and growing factor and the retrieval of data significantly affects the processing, delaying the availability of data for scientific usage and software test. Embedded compression software is planned to make the project tractable by reducing the data storage volume to an acceptable level during normal processing.
2001-08-30
Body with Thermo-Chemical destribution of Heat-Protected System . In: Physical and Gasdynamic Phenomena in Supersonic Flows Over Bodies. Edit. By...Final Report on ISTC Contract # 1809p Parametric Study of Advanced Mixing of Fuel/Oxidant System in High Speed Gaseous Flows and Experimental...of Advanced Mixing of Fuel/Oxidant System in High Speed Gaseous Flows and Experimental Validation Planning 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT
Advanced Avionics and Processor Systems for Space and Lunar Exploration
NASA Technical Reports Server (NTRS)
Keys, Andrew S.; Adams, James H.; Ray, Robert E.; Johnson, Michael A.; Cressler, John D.
2009-01-01
NASA's newly named Advanced Avionics and Processor Systems (AAPS) project, formerly known as the Radiation Hardened Electronics for Space Environments (RHESE) project, endeavors to mature and develop the avionic and processor technologies required to fulfill NASA's goals for future space and lunar exploration. Over the past year, multiple advancements have been made within each of the individual AAPS technology development tasks that will facilitate the success of the Constellation program elements. This paper provides a brief review of the project's recent technology advancements, discusses their application to Constellation projects, and addresses the project's plans for the coming year.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... Project (APP). The APP is a planned natural gas pipeline system that would transport gas produced on the Alaska North Slope to the Alaska-Canada border to connect with a pipeline system in Canada for onward..., 2051 Barter Avenue Kaktovik, AK. Dated: December 9, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011...
1984-08-01
and FPS-60 -’ vacuum-tube radars. There will be remote control interface units ( RCIU ) for tube-type radars, and an ARSR-3 relocation and RIH package...Facility RCE Remote Control Equipment; Radio Control Equipment RCIU Remote Control Interface Units RCO Remote Communications Outlet RDCC Research
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…
Prior to initiation of the Arizona Border Survey, a quality systems implementation plan (QSIP) addressing all aspects of the project was developed by the investigating consortium composed of researchers from The University of Arizona (UA), Battelle Memorial Institute (BMI), and t...
Progress in knowledge representation research
NASA Technical Reports Server (NTRS)
Lum, Henry
1985-01-01
Brief descriptions are given of research being carried out in the field of knowledge representation. Dynamic simulation and modelling of planning systems with real-time sensor inputs; development of domain-independent knowledge representation tools which can be used in the development of application-specific expert and planning systems; and development of a space-borne very high speed integrated circuit processor are among the projects discussed.
ERIC Educational Resources Information Center
Salazar, LeRoy; And Others
This resource for trainers involved in irrigated agriculture training for Peace Corps volunteers consists of two parts: irrigation training manual and irrigation reference manual. The complete course should fully prepare volunteers serving as irrigation, specialists to plan, implement, evaluate and manage small-scale irrigation projects in arid,…
Top Down Implementation Plan for system performance test software
NASA Technical Reports Server (NTRS)
Jacobson, G. N.; Spinak, A.
1982-01-01
The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.
Dreachslin, Janice L; Weech-Maldonado, Robert; Gail, Judith; Epané, Josué Patien; Wainio, Joyce Anne
How can healthcare leaders build a sustainable infrastructure to leverage workforce diversity and deliver culturally and linguistically appropriate care to patients? To answer that question, two health systems participated in the National Center for Healthcare Leadership's diversity leadership demonstration project, November 2008 to December 2013. Each system provided one intervention hospital and one control hospital.The control hospital in each system participated in pre- and postassessments but received no preassessment feedback and no intervention support. Each intervention hospital's C-suite leadership and demonstration project manager worked with a diversity coach provided by the National Center for Healthcare Leadership to design and implement an action plan to improve diversity and cultural competence practices and build a sustainable infrastructure. Plans explored areas of strength and areas for improvement that were identified through preintervention assessments. The assessments focused on five competencies of strategic diversity management and culturally and linguistically appropriate care: diversity leadership, strategic human resource management, organizational climate, diversity climate, and patient cultural competence.This article describes each intervention hospital's success in action plan implementation and reports results of postintervention interviews with leadership to provide a blueprint for sustainable change.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arthur, J. Daniel
2012-07-01
The objective of this project is to develop a modeling system to allow operators and regulators to plan all aspects of water management activities associated with shale gas development in the target project area of New York, Pennsylvania, and West Virginia (target area ), including water supply, transport, storage, use, recycling, and disposal and which can be used for planning, managing, forecasting, permit tracking, and compliance monitoring. The proposed project is a breakthrough approach to represent the entire shale gas water lifecycle in one comprehensive system with the capability to analyze impacts and options for operational efficiency and regulatory trackingmore » and compliance, and to plan for future water use and disposition. It will address all of the major water-related issues of concern associated with shale gas development in the target area, including water withdrawal, transport, storage, use, treatment, recycling, and disposal. It will analyze the costs, water use, and wastes associated with the available options, and incorporate constraints presented by permit requirements, agreements, local and state regulations, equipment and material availability, etc. By using the system to examine the water lifecycle from withdrawals through disposal, users will be able to perform scenario analysis to answer "what if" questions for various situations. The system will include regulatory requirements of the appropriate state and regional agencies and facilitate reporting and permit applications and tracking. These features will allow operators to plan for more cost effective resource production. Regulators will be able to analyze impacts of development over an entire area. Regulators can then make informed decisions about the protections and practices that should be required as development proceeds. This modeling system will have myriad benefits for industry, government, and the public. For industry, it will allow planning all water management operations for a project or an area as one entity to optimize water use and minimize costs subject to regulatory and other constraints. It will facilitate analysis of options and tradeoffs, and will also simplify permitting and reporting to regulatory agencies. The system will help regulators study cumulative impacts of development, conserve water resources, and manage disposal options across a region. It will also allow them to track permits and monitor compliance. The public will benefit from water conservation, improved environmental performance as better system wide decisions are made, and greater supply of natural gas, with attendant lower prices, as costs are reduced and development is assisted through better planning and scheduling. Altogether, better economics and fewer barriers will facilitate recovery of the more than 300 trillion cubic feet of estimated recoverable natural gas resource in the Marcellus Shale in a manner that protects the environment.« less
Systems engineering real estate development projects
NASA Astrophysics Data System (ADS)
Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy
2017-10-01
In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.
Status of DoD Robotic Programs
1985-03-01
planning or adhere to previously planned routes. 0 Control. Controls are micro electronics based which provide means of autonomous action directly...KEY No: I 11 1181 1431 OROJECT Titloi ISMART TERRAIN ANALYSIS FOR ROBOTIC SYSTEMS (STARS) PROJECT Not I I CLASSIFICATION: IUCI TASK Titles IAUTOMATIC
DOT National Transportation Integrated Search
2000-12-01
This paper brings together the findings of activities that addressed the impacts of nontechnical barriers and constraints that might impede the progress of Intelligent Transportation Systems (ITS) programs. It discusses how the planning and deploymen...
Transportation Institutional Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader'smore » convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.« less
Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah
2016-01-01
Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services that meet the needs of the population and contribute to service and system improvement and innovation.
Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.
I-95 Corridor Coalition Project #3 (95-003) : surveillance requirements/technology
DOT National Transportation Integrated Search
1995-06-23
The purpose of this Surveillance Requirements/Technology (SR/T) Project is to develop an : implementation plan for a Corridor-wide traffic and environmental surveillance system using state-of-the-art and cost-effective technologies. To fulfill this p...
DOT National Transportation Integrated Search
2014-05-01
Sustainability has increased in popularity as a key indicator for planning transportation projects. With that : movement, evaluating the sustainability of transportation projects has become necessary for state : departments of transportation (DOTs). ...
North Carolina: Statewide Automation and Connectivity Efforts.
ERIC Educational Resources Information Center
Christian, Elaine J., Ed.
1996-01-01
Describes statewide information automation and connectivity efforts in North Carolina. Highlights include Triangle Research Libraries Network Document Delivery System; cooperative networking projects; public library connectivity to the state library; rural access projects; community college automation; K-12 technology plans; electronic government…
Mass transit : review of the Tren Urbano finance plan
DOT National Transportation Integrated Search
2000-03-31
In summary, we found that the Authority has sufficient funding to meet the expected cost of the project without seeking additional New Starts funds or adversely affecting other parts of the transportation system in Puerto Rico. To finance the project...
Making waves: systems change on behalf of youth with HIV/AIDS.
Botwinick, Geri; Bell, Douglas; Johnson, Robert L; Sell, Randall L; Friedman, Lawrence B; Dodds, Sally; Shaw, Kimberly; Martinez, Jaime; Siciliano, Carl; Walker, Lynn E; Sotheran, Jo L
2003-08-01
To document the effects of five Special Projects of National Significance (SPNS), funded by the Health Resources and Services Administration (HRSA), on HIV care, related service systems, policy, planning, and funding for youth with HIV/AIDS. Literature on services and systems integration and technology transfer is used as a conceptual framework for the examination of HIV-informed, youth-specific changes at the local, state, and national levels. The Principal Investigators for each project and/or the Project Evaluators were interviewed several times to capture "snapshots" of evolving results from the Projects' varied activities in New York City; Newark, New Jersey; Chicago; and Miami. Some changes were consciously targeted, and others occurred serendipitously. This work covers the funding period from 1996 through 2000. There were many "ripple" effects that emanated from these Projects' presence and activities. Important lessons were learned about why systems change is necessary to effectively serve youth with HIV, how to make constructive changes happen, and how to sustain changes once they are achieved. Successful strategies included, but were not limited to, consensus-building among stakeholders, participatory planning and decision-making, collaborative referral and linkage agreements, staff sharing, co-locating services, providing technical assistance, consultation, cross-training, and engaging consumers as partners in communicating new technologies and in advocating for change.
Building a Propulsion Experiment Project Management Environment
NASA Technical Reports Server (NTRS)
Keiser, Ken; Tanner, Steve; Hatcher, Danny; Graves, Sara
2004-01-01
What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.
Speed scanning system based on solid-state microchip laser for architectural planning
NASA Astrophysics Data System (ADS)
Redka, Dmitriy; Grishkanich, Alexsandr S.; Kolmakov, Egor; Tsvetkov, Konstantin
2017-10-01
According to the current great interest concerning Large-Scale Metrology applications in many different fields of manufacturing industry, technologies and techniques for dimensional measurement have recently shown a substantial improvement. Ease-of-use, logistic and economic issues, as well as metrological performance, are assuming a more and more important role among system requirements. The project is planned to conduct experimental studies aimed at identifying the impact of the application of the basic laws of microlasers as radiators on the linear-angular characteristics of existing measurement systems. The project is planned to conduct experimental studies aimed at identifying the impact of the application of the basic laws of microlasers as radiators on the linear-angular characteristics of existing measurement systems. The system consists of a distributed network-based layout, whose modularity allows to fit differently sized and shaped working volumes by adequately increasing the number of sensing units. Differently from existing spatially distributed metrological instruments, the remote sensor devices are intended to provide embedded data elaboration capabilities, in order to share the overall computational load.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
NASA Astrophysics Data System (ADS)
Goerres, J.; Uneri, A.; Jacobson, M.; Ramsay, B.; De Silva, T.; Ketcha, M.; Han, R.; Manbachi, A.; Vogt, S.; Kleinszig, G.; Wolinsky, J.-P.; Osgood, G.; Siewerdsen, J. H.
2017-12-01
Percutaneous pelvic screw placement is challenging due to narrow bone corridors surrounded by vulnerable structures and difficult visual interpretation of complex anatomical shapes in 2D x-ray projection images. To address these challenges, a system for planning, guidance, and quality assurance (QA) is presented, providing functionality analogous to surgical navigation, but based on robust 3D-2D image registration techniques using fluoroscopy images already acquired in routine workflow. Two novel aspects of the system are investigated: automatic planning of pelvic screw trajectories and the ability to account for deformation of surgical devices (K-wire deflection). Atlas-based registration is used to calculate a patient-specific plan of screw trajectories in preoperative CT. 3D-2D registration aligns the patient to CT within the projective geometry of intraoperative fluoroscopy. Deformable known-component registration (dKC-Reg) localizes the surgical device, and the combination of plan and device location is used to provide guidance and QA. A leave-one-out analysis evaluated the accuracy of automatic planning, and a cadaver experiment compared the accuracy of dKC-Reg to rigid approaches (e.g. optical tracking). Surgical plans conformed within the bone cortex by 3-4 mm for the narrowest corridor (superior pubic ramus) and >5 mm for the widest corridor (tear drop). The dKC-Reg algorithm localized the K-wire tip within 1.1 mm and 1.4° and was consistently more accurate than rigid-body tracking (errors up to 9 mm). The system was shown to automatically compute reliable screw trajectories and accurately localize deformed surgical devices (K-wires). Such capability could improve guidance and QA in orthopaedic surgery, where workflow is impeded by manual planning, conventional tool trackers add complexity and cost, rigid tool assumptions are often inaccurate, and qualitative interpretation of complex anatomy from 2D projections is prone to trial-and-error with extended fluoroscopy time.
Spent nuclear fuel project high-level information management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Main, G.C.
1996-09-13
This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less
Sanchez-Parcerisa, Daniel; Udías, Jose
2018-05-12
Open-source, MATLAB-based treatment planning systems FoCa and matRAD were used in a pilot project for training prospective medical physicists and postgraduate physics students in treatment planning and beam modeling techniques for proton therapy. In the four exercises designed, students learnt how proton pencil beams are modeled and how dose is calculated in three-dimensional voxelized geometries, how pencil beam scanning plans (PBS) are constructed, the rationale behind the choice of spot spacing in patient plans, and the dosimetric differences between photon IMRT and proton PBS plans. Sixty students of two courses participated in the pilot project, with over 90% of satisfactory rating from student surveys. The pilot experience will certainly be continued. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.
An Overview of ANN Application in the Power Industry
NASA Technical Reports Server (NTRS)
Niebur, D.
1995-01-01
The paper presents a survey on the development and experience with artificial neural net (ANN) applications for electric power systems, with emphasis on operational systems. The organization and constraints of electric utilities are reviewed, motivations for investigating ANN are identified, and a current assessment is given from the experience of 2400 projects using ANN for load forecasting, alarm processing, fault detection, component fault diagnosis, static and dynamic security analysis, system planning, and operation planning.
Open Innovation and the Erosion of the Traditional Information Systems Project's Boundaries
NASA Astrophysics Data System (ADS)
Elbanna, Amany
This paper examines the notion of open innovation and its implication on information systems management. It investigates a project of an enterprise resource planning system implementation in an international organization to unravel the resemblance with the open innovation model. The study shows that the conceptualization of ERP project as an open innovation could reveal the complex architecture of today's organization from which the ERP project cannot be isolated. It argues that the traditional boundaries around IS projects are dissolving and the relationship between what used to be outside and what used to be inside the project is increasingly blurred. The study calls for a different perspective of project management that goes beyond single and multiple project management to scan the open space of innovation and actively look for partners, competitors, and collaborators.
Internship - practical education
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porell, A.L.; Bauman, H.F.
1989-01-01
The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less
Prototyping a bedside documentation system.
Bachand, P; Bobis, K
1993-01-01
The implementation of a comprehensive bedside documentation system is a major project that demands careful analysis and planning. Since the cost of a typical bedside system can easily exceed $3 million, a design oversight could have disastrous effects on the benefits of the system.
Space transportation system payload status and reimbursement policy
NASA Technical Reports Server (NTRS)
Yardley, J. F.
1977-01-01
The status of the Space Transportation System (STS) is reviewed. The management structure and project planning status are discussed, including considerations of STS utilization, payloads, cost assessments, and pricing policy.
Controls and Participation for Successful Information Systems.
ERIC Educational Resources Information Center
Donald, A. Wayne
1979-01-01
The major information systems at Virginia Polytechnic Institute and State University are described. The use of the feedback and feedforward controls in planning and projecting administrative functions is examined. (Author/BH)
Integrated flexible manufacturing program for manufacturing automation and rapid prototyping
NASA Technical Reports Server (NTRS)
Brooks, S. L.; Brown, C. W.; King, M. S.; Simons, W. R.; Zimmerman, J. J.
1993-01-01
The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.
ERIC Educational Resources Information Center
Blazer, Christie
2012-01-01
A high percentage of ERP projects are classified as failures, leaving organizations with only partially functioning systems or, worse yet, with no ERP systems at all. Those that do succeed usually take significantly longer than expected and encounter staggering budget overruns. This Information Capsule summarizes 10 high profile ERP implementation…
ERIC Educational Resources Information Center
James, Arthur; Arboleda, Jairo
1979-01-01
Plans for a nationwide system of education at a distance in Colombia, South America, are now under way to meet growing demands for higher education and to decentralize the current university system. Prior to this decision, a feasibility project was undertaken by the University of Antioquia. The project and results are reported. (Author/JMD)
ERIC Educational Resources Information Center
Arantes do Amaral, Joao Alberto; Gonçalves, Paulo
2015-01-01
This case study describes a continuous improvement experience, conducted from 2002 to 2014 in Sao Paulo, Brazil, within 47 Project-Based Learning MBA courses, involving approximately 1,400 students. The experience report will focus on four themes: (1) understanding the main dynamics present in MBA courses; (2) planning a systemic intervention in…
NASA Technical Reports Server (NTRS)
1971-01-01
The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.
Facilities Planning Guide for the Community College System.
ERIC Educational Resources Information Center
Massachusetts Advisory Council on Education, Boston.
These guidelines include definitions pertaining to educational criteria and planning criteria, and guidelines regarding--(1) administrative ratios, (2) space allocation in assignable square feet, (3) area conversion factors, (4) gross building area distribution, (5) curriculum balance development, (6) project performance schedule, and (7) project…
43. FLOOR PLAN OF POWER HOUSE, EXHIBIT L, SANTA ANA ...
43. FLOOR PLAN OF POWER HOUSE, EXHIBIT L, SANTA ANA RIVER NO. 2 PROJECT, APR. 30, 1945. SCE drawing no. 523643 (sheet no. 14; for filing with Federal Power Commission). - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA
NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations
NASA Technical Reports Server (NTRS)
Letchworth, Gary; Schlierf, Roland
2011-01-01
The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.
10 MW Supercritical CO2 Turbine Test
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turchi, Craig
2014-01-29
The Supercritical CO2 Turbine Test project was to demonstrate the inherent efficiencies of a supercritical carbon dioxide (s-CO2) power turbine and associated turbomachinery under conditions and at a scale relevant to commercial concentrating solar power (CSP) projects, thereby accelerating the commercial deployment of this new power generation technology. The project involved eight partnering organizations: NREL, Sandia National Laboratories, Echogen Power Systems, Abengoa Solar, University of Wisconsin at Madison, Electric Power Research Institute, Barber-Nichols, and the CSP Program of the U.S. Department of Energy. The multi-year project planned to design, fabricate, and validate an s-CO2 power turbine of nominally 10 MWemore » that is capable of operation at up to 700°C and operates in a dry-cooled test loop. The project plan consisted of three phases: (1) system design and modeling, (2) fabrication, and (3) testing. The major accomplishments of Phase 1 included: Design of a multistage, axial-flow, s-CO2 power turbine; Design modifications to an existing turbocompressor to provide s-CO2 flow for the test system; Updated equipment and installation costs for the turbomachinery and associated support infrastructure; Development of simulation tools for the test loop itself and for more efficient cycle designs that are of greater commercial interest; Simulation of s-CO2 power cycle integration into molten-nitrate-salt CSP systems indicating a cost benefit of up to 8% in levelized cost of energy; Identification of recuperator cost as a key economic parameter; Corrosion data for multiple alloys at temperatures up to 650ºC in high-pressure CO2 and recommendations for materials-of-construction; and Revised test plan and preliminary operating conditions based on the ongoing tests of related equipment. Phase 1 established that the cost of the facility needed to test the power turbine at its full power and temperature would exceed the planned funding for Phases 2 and 3. Late in Phase 1 an opportunity arose to collaborate with another turbine-development team to construct a shared s-CO2 test facility. The synergy of the combined effort would result in greater facility capabilities than either separate project could produce and would allow for testing of both turbine designs within the combined budgets of the two projects. The project team requested a no-cost extension to Phase 1 to modify the subsequent work based on this collaborative approach. DOE authorized a brief extension, but ultimately opted not to pursue the collaborative facility and terminated the project.« less
Projecting other public inventories for the 2005 RPA timber assessment update.
Xiaoping Zhou; John R. Mills; Richard W. Haynes
2007-01-01
This study gives an overview of the current inventory status and the projection of future forest inventories on other public timberland. Other public lands are lands administered by state, local, and federal government but excluding National Forest System lands. These projections were used as part of the 2005 USDA Forest Service Resource Planning Act timber assessment...
Jennifer L. Long; Melanie Miller; James P. Menakis; Robert E. Keane
2006-01-01
The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, required a system for classifying vegetation composition, biophysical settings, and vegetation structure to facilitate the mapping of vegetation and wildland fuel characteristics and the simulation of vegetation dynamics using landscape modeling. We developed...
ERIC Educational Resources Information Center
Roark, Steven
2001-01-01
Presents the fifth installment examining the expansion and renovation project of Longview Community College's Liberal Arts Building in Kansas City (Missouri). Reviewed are the gaining of final approvals from administrators on project plans and the detailing of wall construction, structural systems, HVAC units, and finishes. (GR)
ERIC Educational Resources Information Center
Watt, Michael G.
This evaluation project presents a plan for a program to establish a clearinghouse for exchanging qualitative and quantitative data on instructional materials used in Australian schools. A range of elements necessary to plan a program suited to Australian requirements and conditions was investigated. Focus was on: the program's mission,…
RoBlock: a prototype autonomous manufacturing cell
NASA Astrophysics Data System (ADS)
Baekdal, Lars K.; Balslev, Ivar; Eriksen, Rene D.; Jensen, Soren P.; Jorgensen, Bo N.; Kirstein, Brian; Kristensen, Bent B.; Olsen, Martin M.; Perram, John W.; Petersen, Henrik G.; Petersen, Morten L.; Ruhoff, Peter T.; Skjolstrup, Carl E.; Sorensen, Anders S.; Wagenaar, Jeroen M.
2000-10-01
RoBlock is the first phase of an internally financed project at the Institute aimed at building a system in which two industrial robots suspended from a gantry, as shown below, cooperate to perform a task specified by an external user, in this case, assembling an unstructured collection of colored wooden blocks into a specified 3D pattern. The blocks are identified and localized using computer vision and grasped with a suction cup mechanism. Future phases of the project will involve other processes such as grasping and lifting, as well as other types of robot such as autonomous vehicles or variable geometry trusses. Innovative features of the control software system include: The use of an advanced trajectory planning system which ensures collision avoidance based on a generalization of the method of artificial potential fields, the use of a generic model-based controller which learns the values of parameters, including static and kinetic friction, of a detailed mechanical model of itself by comparing actual with planned movements, the use of fast, flexible, and robust pattern recognition and 3D-interpretation strategies, integration of trajectory planning and control with the sensor systems in a distributed Java application running on a network of PC's attached to the individual physical components. In designing this first stage, the aim was to build in the minimum complexity necessary to make the system non-trivially autonomous and to minimize the technological risks. The aims of this project, which is planned to be operational during 2000, are as follows: To provide a platform for carrying out experimental research in multi-agent systems and autonomous manufacturing systems, to test the interdisciplinary cooperation architecture of the Maersk Institute, in which researchers in the fields of applied mathematics (modeling the physical world), software engineering (modeling the system) and sensor/actuator technology (relating the virtual and real worlds) could collaborate with systems integrators to construct intelligent, autonomous systems, and to provide a showpiece demonstrator in the entrance hall of the Institute's new building.
Avionics test bed development plan
NASA Technical Reports Server (NTRS)
Harris, L. H.; Parks, J. M.; Murdock, C. R.
1981-01-01
A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.
R and T report: Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Soffen, Gerald A. (Editor)
1993-01-01
The 1993 Research and Technology Report for Goddard Space Flight Center is presented. Research covered areas such as (1) flight projects; (2) space sciences including cosmology, high energy, stars and galaxies, and the solar system; (3) earth sciences including process modeling, hydrology/cryology, atmospheres, biosphere, and solid earth; (4) networks, planning, and information systems including support for mission operations, data distribution, advanced software and systems engineering, and planning/scheduling; and (5) engineering and materials including spacecraft systems, material and testing, optics and photonics and robotics.
Upgrading IEC strategy: the happy family coupon campaign.
Alberto, C S
1976-01-01
The Information, Education and Communication Division of the Family Planning Organization of the Philippines launched a Happy Family Coupon Campaign, a project to test the feasibility and the potential of a scheme whereby materials were distributed in response to individuals' expressed needs and interest. The project aims were: 1) to reach specific target groups, represented by readers of commercially printed materials; 2) to explore the potential of the mail system as a medium for the distribution of family planning materials; 3) to test the effectiveness of commercial publications as a vehicle for creating demand for family planning information; and 4) to secure feedback regarding preferences for the various family planning materials. The campaign had 2 major components: 1) advertising as a means of informing readers about the availability of certain family planning information materils, and 2) mail service as a channel for delivering requested materials to the respondents. 12 types of informational materials were distributed, each written in English, Filipino, and the Ilocano, Cebuano, and Ilongo dialects. These pamphlets and leaflets are described. The campaign drew a total of 24,226 respondents from August 1974 to December 1975. 58.7% of the respondents had 1-4 children, 26.4% had 5 or more children, and the remaining 14.9% gave no information concerning the number of children. It appears that the project has already achieved a measure of success as indicated by: 1) specific target groups were reached, 2) the potential of the mail system as a channel for the distribution of family planning was not confined to the buyers of the publications, 3) the potential of commercial publications as vehicles for creating demand for family planning information was tested, and 4) feedback regarding preferences of various groups for different family planning materials was obtained.
Including information technology project management in the nursing informatics curriculum.
Sockolow, Paulina; Bowles, Kathryn H
2008-01-01
Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.
A Case Study: Climate Change Decision Support for the Apalachicola, Chattahoochee, Flint Basins
NASA Astrophysics Data System (ADS)
Day, G. N.; McMahon, G.; Friesen, N.; Carney, S.
2011-12-01
Riverside Technology, inc. has developed a Climate Change Decision Support System (DSS) to provide water managers with a tool to explore a range of current Global Climate Model (GCM) projections to evaluate their potential impacts on streamflow and the reliability of future water supplies. The system was developed as part of a National Oceanic and Atmospheric Administration (NOAA) Small Business Innovation Research (SBIR) project. The DSS uses downscaled GCM data as input to small-scale watershed models to produce time series of projected undepleted streamflow for various emission scenarios and GCM simulations. Until recently, water managers relied on historical streamflow data for water resources planning. In many parts of the country, great effort has been put into estimating long-term historical undepleted streamflow accounting for regulation, diversions, and return flows to support planning and water rights administration. In some cases, longer flow records have been constructed using paleohydrologic data in an attempt to capture climate variability beyond what is evident during the observed historical record. Now, many water managers are recognizing that historical data may not be representative of an uncertain climate future, and they have begun to explore the use of climate projections in their water resources planning. The Climate Change DSS was developed to support water managers in planning by accounting for both climate variability and potential climate change. In order to use the information for impact analysis, the projected streamflow time series can be exported and substituted for the historical streamflow data traditionally applied in their system operations models for water supply planning. This paper presents a case study in which climate-adjusted flows are coupled with the U.S. Army Corps of Engineers (USACE) ResSim model for the Apalachicola, Chattahoochee, and Flint (ACF) River basins. The study demonstrates how climate scenarios can be used with existing or proposed operating rules to explore the range of potential climate impacts on lake levels, drought trigger frequency, hydropower generation, and low-flow statistics. Initial system implementation of the Climate Change DSS was focused in the State of Colorado working with water supply agencies in the Front Range to assess local water supply vulnerability to climate change. To facilitate national implementation, the system capitalizes on National Weather Service (NWS) watershed models currently used for operational river forecasting. These models are well calibrated and available for the entire country. The system has been extended to include the ACF and the Sacramento River basins because of the importance of the water resources in these basins. Plans are now being made to expand coverage to include the Baltimore-Washington, D.C. water supply area. The DSS is operational and publicly available (www.climatechangedss.com).
System description and requirements document.
DOT National Transportation Integrated Search
2007-10-10
The Next Generation 911 Initiative (NG911) : is a U.S. Department of Transportation (USDOT) : research and development project that will help : define the system architecture and develop a : transition plan that considers responsibilities...
ERIC Educational Resources Information Center
Schofer, Richard C.; And Others
A handbook to assist states in fulfilling requirements of Public Law 94-142 to provide a Comprehensive System of Personnel Development (CSPD) for special education staff is presented. The handbook is intended to help writers develop, review, update, and implement the CSPD, which is one section of the state plan submitted to the federal government.…
ERIC Educational Resources Information Center
DEYO, DONALD E.
THIS SUMMARY REPORT REAPPRAISES THE 1958 MASTER PLAN AND PROJECTS THE COMMUNITY COLLEGE SYSTEM TO 1975 ACCORDINGLY. IT COVERS ALL ASPECTS OF SUCH A SYSTEM AND MAY SERVE AS A GUIDE TO OTHER STATE OR REGIONAL PLANNERS. ITS CONSIDERATIONS INCLUDE (1) A PHILOSOPHY OF HIGHER EDUCATION, (2) THE PURPOSE AND FUNCTION OF THE MASSACHUSETTS COMMUNITY COLLEGE…
SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions
NASA Technical Reports Server (NTRS)
Kao, Cheng-Yan; Lee, Seok-Hua
1992-01-01
The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
33 CFR 385.24 - Project Management Plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
NASA Astrophysics Data System (ADS)
Petrachenko, Bill; Behrend, Dirk; Gipson, John; Hase, Hayo; Ma, Chopo; MacMillan, Dan; Niell, Arthur; Nothnagel, Axel; Zhang, Xiuzhong
2014-12-01
Over the past several years, the VGOS broadband system has been under development; it is currently undergoing advanced testing. At the same time, commitments were made for a number of antenna projects with as many as 30 stations expected for VGOS observing by 2019. In order to focus activities into the future, a proposal was made by the VPEG for an observing plan with the long term goal of guiding the transition from S/X operations to VGOS operations. The plan anticipates that by the end of 2014 as many as eight antennas will be capable of broadband observing. These antennas will participate in a series of test campaigns during 2015 followed by a VGOS pilot project throughout 2016. Full operations with as many as 16 stations are expected to begin in 2017. The observing plan places a priority on early improvement in the quality of daily products. As a result, the pilot project involves a single weekly 24-hour session with reduced duty cycle sessions on each of the remaining days of the week. Correlator and data transmission requirements for the plan are currently being assessed.
Evaluation Plan for the Cape Cod Advanced Public Transportation System
DOT National Transportation Integrated Search
2000-06-01
The Cape Cod Regional Transit Authority (CCRTA) Advanced Public Transportation System (APTS) project is an application of Intelligent Transportation Systems (ITS) to fixed route and paratransit operations in a rural transit setting. The purpose of th...
National Airspace System : status of wide area augmentation system project
DOT National Transportation Integrated Search
1998-04-30
As a key element of its overall program for modernizing the National Airspace : System, the Federal Aviation Administration (FAA) is planning a transition from : ground- to satellite-based navigation by using satellite signals generated by : the Depa...
DOT National Transportation Integrated Search
2010-12-01
The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the operation of freeways, arterials, and public transit. The system will be shared between information system...
Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project
NASA Technical Reports Server (NTRS)
Griner, James H.
2013-01-01
NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication system prototype radio, operating on recently allocated UAS frequency spectrum bands. The prototype radio will be used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the design, development, and flight test planning for this prototype radio.
Experiment for Integrating Dutch 3d Spatial Planning and Bim for Checking Building Permits
NASA Astrophysics Data System (ADS)
van Berlo, L.; Dijkmans, T.; Stoter, J.
2013-09-01
This paper presents a research project in The Netherlands in which several SMEs collaborated to create a 3D model of the National spatial planning information. This 2D information system described in the IMRO data standard holds implicit 3D information that can be used to generate an explicit 3D model. The project realized a proof of concept to generate a 3D spatial planning model. The team used the model to integrate it with several 3D Building Information Models (BIMs) described in the open data standard Industry Foundation Classes (IFC). Goal of the project was (1) to generate a 3D BIM model from spatial planning information to be used by the architect during the early design phase, and (2) allow 3D checking of building permits. The team used several technologies like CityGML, BIM clash detection and GeoBIM to explore the potential of this innovation. Within the project a showcase was created with a part of the spatial plan from the city of The Hague. Several BIM models were integrated in the 3D spatial plan of this area. A workflow has been described that demonstrates the benefits of collaboration between the spatial domain and the AEC industry in 3D. The research results in a showcase with conclusions and considerations for both national and international practice.
NASA Astrophysics Data System (ADS)
Turner, Sean W. D.; Marlow, David; Ekström, Marie; Rhodes, Bruce G.; Kularathna, Udaya; Jeffrey, Paul J.
2014-04-01
Despite a decade of research into climate change impacts on water resources, the scientific community has delivered relatively few practical methodological developments for integrating uncertainty into water resources system design. This paper presents an application of the "decision scaling" methodology for assessing climate change impacts on water resources system performance and asks how such an approach might inform planning decisions. The decision scaling method reverses the conventional ethos of climate impact assessment by first establishing the climate conditions that would compel planners to intervene. Climate model projections are introduced at the end of the process to characterize climate risk in such a way that avoids the process of propagating those projections through hydrological models. Here we simulated 1000 multisite synthetic monthly streamflow traces in a model of the Melbourne bulk supply system to test the sensitivity of system performance to variations in streamflow statistics. An empirical relation was derived to convert decision-critical flow statistics to climatic units, against which 138 alternative climate projections were plotted and compared. We defined the decision threshold in terms of a system yield metric constrained by multiple performance criteria. Our approach allows for fast and simple incorporation of demand forecast uncertainty and demonstrates the reach of the decision scaling method through successful execution in a large and complex water resources system. Scope for wider application in urban water resources planning is discussed.
NASA Astrophysics Data System (ADS)
Mattioli, Glen S.; Young, Simon R.; Voight, Barry; Sparks, R. Steven J.; Shalev, Eylon; Selwyn, Sacks; Malin, Peter; Linde, Alan; Johnston, William; Hadayat, Dannie; Elsworth, Derek; Dunkley, Peter; Herd, Richard; Neuberg, Jurgen; Norton, Gillian; Widiwijayanti, Christina
2004-08-01
This article is an update on the status of an innovative new project designed to enhance generally our understanding of andesitic volcano eruption dynamics and, specifically, the monitoring and scientific infrastructure at the active Soufriàre Hills Volcano (SHV), Montserrat. The project has been designated as the Caribbean Andesite Lava Island Precision Seismo-geodetic Observatory, known as CALIPSO. Its purpose is to investigate the dynamics of the entire SHV magmatic system using an integrated array of specialized instruments in four strategically located ~200-m-deep boreholes in concert with several shallower holes and surface sites. The project is unique, as it represents the first, and only, such borehole volcano-monitoring array deployed at an andesitic stratovolcano. CALIPSO may be considered as a prototype for planned Plate Boundary Observatory (PBO) installations at several volcanic targets in the western United States. Scientific objectives of the EarthScope Integrated Science Plan (ES-ISP) relevant to magmatic systems are to investigate (1) melt generation in the mantle; (2) melt migration from the mantle to and through the crust to the surface; (3) melt residence times at various deep reservoirs; and (4) delineation of characteristic patterns of surface deformation and seismicity, which may prove useful in eruption forecasting. The CALIPSO project shares most of the same scientific goals and has, moreover, the benefit of a rich existing geophysical context in its deployment at SHV. Our experience during instrument design, planning, drilling and installation, systems integration, and early operation of CALIPSO, moreover, may prove valuable to EarthScope and PBO managers.
DOT National Transportation Integrated Search
1998-08-01
The DIRECT project compared four low-cost driver information systems. Of the four that were : compared, the RDS approach proved superior to the others in toggling reliability and voice quality. The DIRECT project planned to expand the implementation ...
Evaluation of two typical distributed energy systems
NASA Astrophysics Data System (ADS)
Han, Miaomiao; Tan, Xiu
2018-03-01
According to the two-natural gas distributed energy system driven by gas engine driven and gas turbine, in this paper, the first and second laws of thermodynamics are used to measure the distributed energy system from the two parties of “quantity” and “quality”. The calculation results show that the internal combustion engine driven distributed energy station has a higher energy efficiency, but the energy efficiency is low; the gas turbine driven distributed energy station energy efficiency is high, but the primary energy utilization rate is relatively low. When configuring the system, we should determine the applicable natural gas distributed energy system technology plan and unit configuration plan according to the actual load factors of the project and the actual factors such as the location, background and environmental requirements of the project. “quality” measure, the utilization of waste heat energy efficiency index is proposed.
JPL's Real-Time Weather Processor project (RWP) metrics and observations at system completion
NASA Technical Reports Server (NTRS)
Loesh, Robert E.; Conover, Robert A.; Malhotra, Shan
1990-01-01
As an integral part of the overall upgraded National Airspace System (NAS), the objective of the Real-Time Weather Processor (RWP) project is to improve the quality of weather information and the timeliness of its dissemination to system users. To accomplish this, an RWP will be installed in each of the Center Weather Service Units (CWSUs), located in 21 of the 23 Air Route Traffic Control Centers (ARTCCs). The RWP System is a prototype system. It is planned that the software will be GFE and that production hardware will be acquired via industry competitive procurement. The ARTCC is a facility established to provide air traffic control service to aircraft operating on Instrument Flight Rules (IFR) flight plans within controlled airspace, principally during the en route phase of the flight. Covered here are requirement metrics, Software Problem Failure Reports (SPFRs), and Ada portability metrics and observations.
Miniature Telerobots in Space Applications
NASA Technical Reports Server (NTRS)
Venema, S. C.; Hannaford, B.
1995-01-01
Ground controlled telerobots can be used to reduce astronaut workload while retaining much of the human capabilities of planning, execution, and error recovery for specific tasks. Miniature robots can be used for delicate and time consuming tasks such as biological experiment servicing without incurring the significant mass and power penalties associated with larger robot systems. However, questions remain regarding the technical and economic effectiveness of such mini-telerobotic systems. This paper address some of these open issues and the details of two projects which will provide some of the needed answers. The Microtrex project is a joint University of Washington/NASA project which plans on flying a miniature robot as a Space Shuttle experiment to evaluate the effects of microgravity on ground-controlled manipulation while subject to variable time-delay communications. A related project involving the University of Washington and Boeing Defense and Space will evaluate the effectiveness f using a minirobot to service biological experiments in a space station experiment 'glove-box' rack mock-up, again while subject to realistic communications constraints.
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Gallagher, Suzy; Granier, Martin
1984-01-01
A project is described which has as its goal the production of a set of system-independent, discipline-independent, transportable college level courses to educate science and engineering students in the use of large-scale information storage and retrieval systems. This project is being conducted with the cooperation and sponsorship of NASA by R and D teams at the University of Southwest Louisiana and Southern University. Chapter 1 is an introduction, providing an overview and a listing of the management phases. Chapter 2 furnishes general information regarding accomplishments in areas under development. Chapter 3 deals with the development of the course materials by presenting a series of diagrams and keys to depict the progress and interrelationships of various tasks and sub-tasks. Chapter 4 presents plans for activities to be conducted to complete and deliver course materials. The final chapter is a summary of project objectives, methods, plans, and accomplishments.
Improving System Engineering Excellence at NASA's Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Takada, Pamela Wallace; Newton, Steve; Gholston, Sampson; Thomas, Dale (Technical Monitor)
2001-01-01
NASA's Marshall Space Flight Center (MSFC) management feels that sound system engineering practices are essential for successful project management, NASA studies have concluded that recent project failures could be attributed in part to inadequate systems engineering. A recent survey of MSFC project managers and system engineers' resulted in the recognition of a need for training in Systems Engineering Practices, particularly as they relate to MSFC projects. In response to this survey, an internal pilot short-course was developed to reinforce accepted practices for system engineering at MSFC. The desire of the MSFC management is to begin with in-house training and offer additional educational opportunities to reinforce sound system engineering principles to the more than 800 professionals who are involved with system engineering and project management. A Systems Engineering Development Plan (SEDP) has been developed to address the longer-term systems engineering development needs of MSFC. This paper describes the survey conducted and the training course that was developed in response to that survey.
An efficient inverse radiotherapy planning method for VMAT using quadratic programming optimization.
Hoegele, W; Loeschel, R; Merkle, N; Zygmanski, P
2012-01-01
The purpose of this study is to investigate the feasibility of an inverse planning optimization approach for the Volumetric Modulated Arc Therapy (VMAT) based on quadratic programming and the projection method. The performance of this method is evaluated against a reference commercial planning system (eclipse(TM) for rapidarc(TM)) for clinically relevant cases. The inverse problem is posed in terms of a linear combination of basis functions representing arclet dose contributions and their respective linear coefficients as degrees of freedom. MLC motion is decomposed into basic motion patterns in an intuitive manner leading to a system of equations with a relatively small number of equations and unknowns. These equations are solved using quadratic programming under certain limiting physical conditions for the solution, such as the avoidance of negative dose during optimization and Monitor Unit reduction. The modeling by the projection method assures a unique treatment plan with beneficial properties, such as the explicit relation between organ weightings and the final dose distribution. Clinical cases studied include prostate and spine treatments. The optimized plans are evaluated by comparing isodose lines, DVH profiles for target and normal organs, and Monitor Units to those obtained by the clinical treatment planning system eclipse(TM). The resulting dose distributions for a prostate (with rectum and bladder as organs at risk), and for a spine case (with kidneys, liver, lung and heart as organs at risk) are presented. Overall, the results indicate that similar plan qualities for quadratic programming (QP) and rapidarc(TM) could be achieved at significantly more efficient computational and planning effort using QP. Additionally, results for the quasimodo phantom [Bohsung et al., "IMRT treatment planning: A comparative inter-system and inter-centre planning exercise of the estro quasimodo group," Radiother. Oncol. 76(3), 354-361 (2005)] are presented as an example for an extreme concave case. Quadratic programming is an alternative approach for inverse planning which generates clinically satisfying plans in comparison to the clinical system and constitutes an efficient optimization process characterized by uniqueness and reproducibility of the solution.
Reeder, Blaine; Turner, Anne; Demiris, George
2010-01-01
Continuity of operations planning focuses on an organization's ability to deliver essential services before, during and after an emergency. Public health leaders must make decisions based on information from many sources and their information needs are often facilitated or hindered by technology. The aim of this study is to provide a systematic review of studies of technology projects that address public health continuity of operations planning information needs and to discuss patterns, themes, and challenges to inform the design of public health continuity of operations information systems. To return a comprehensive results set in an under-explored area, we searched broadly in the Medline and EBSCOHost bibliographic databases using terms from prior work in public health emergency management and continuity of operations planning in other domains. In addition, we manually searched the citation lists of publications included for review. A total of 320 publications were reviewed. Twenty studies were identified for inclusion (twelve risk assessment decision support tools, six network and communications-enabled decision support tools, one training tool and one dedicated video-conferencing tool). Levels of implementation for information systems in the included studies range from proposed frameworks to operational systems. There is a general lack of documented efforts in the scientific literature for technology projects about public health continuity of operations planning. Available information about operational information systems suggest inclusion of public health practitioners in the design process as a factor in system success.
Simulation Of Research And Development Projects
NASA Technical Reports Server (NTRS)
Miles, Ralph F.
1987-01-01
Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.
Quality Assurance Project Plan for Citizen Science Projects
The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.
Schmidt, Pete
2017-09-01
In 1972, the Minnesota United Power Association (UPA) teamed up with the Minnesota Cooperative Power Association (CPA) to initiate an electrification project designed to bring power from North Dakota to the Twin Cities area. A significant backlash and protest began once farmers across the state became aware of the plan and the potential impending land seizure. In the midst of these actions, one group sought to create an alternative to the power line transmission system by designing a system of wireless energy transmission based on the plans of Nikola Tesla. This self-funded conglomeration of farmers and amateur researchers formed the People's Power Project (PPP) and set about building Tesla's system for the wireless transmission of energy. Using archival documents, this paper recounts this episode and argues that, in this case, the potential for successful grassroots action was derailed by the influence of longstanding myths about Tesla and his devices. Copyright © 2017 Elsevier Ltd. All rights reserved.
Production roll out plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects,more » General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.« less
Balancing Plan-Driven and Agile Methods in Software Engineering Project Courses
NASA Astrophysics Data System (ADS)
Boehm, Barry; Port, Dan; Winsor Brown, A.
2002-09-01
For the past 6 years, we have been teaching a two-semester software engineering project course. The students organize into 5-person teams and develop largely web-based electronic services projects for real USC campus clients. We have been using and evolving a method called Model- Based (System) Architecting and Software Engineering (MBASE) for use in both the course and in industrial applications. The MBASE Guidelines include a lot of documents. We teach risk-driven documentation: if it is risky to document something, and not risky to leave it out (e.g., GUI screen placements), leave it out. Even so, students tend to associate more documentation with higher grades, although our grading eventually discourages this. We are always on the lookout for ways to have students learn best practices without having to produce excessive documentation. Thus, we were very interested in analyzing the various emerging agile methods. We found that agile methods and milestone plan-driven methods are part of a “how much planning is enough?” spectrum. Both agile and plan-driven methods have home grounds of project characteristics where they clearly work best, and where the other will have difficulties. Hybrid agile/plan-driven approaches are feasible, and necessary for projects having a mix of agile and plan-driven home ground characteristics. Information technology trends are going more toward the agile methods' home ground characteristics of emergent requirements and rapid change, although there is a concurrent increase in concern with dependability. As a result, we are currently experimenting with risk-driven combinations of MBASE and agile methods, such as integrating requirements, test plans, peer reviews, and pair programming into “agile quality management.”
Freehafer, Douglas A.; Pierson, Oliver
2004-01-01
In the fall of 2002, the Onondaga Lake Partnership (OLP) formed a Geographic Information System (GIS) Planning Committee to begin the process of developing a comprehensive watershed geographic information system for Onondaga Lake. The goal of the Onondaga Lake Partnership geographic information system is to integrate the various types of spatial data used for scientific investigations, resource management, and planning and design of improvement projects in the Onondaga Lake Watershed. A needs-assessment survey was conducted and a spatial data framework developed to support the Onondaga Lake Partnership use of geographic information system technology. The design focused on the collection, management, and distribution of spatial data, maps, and internet mapping applications. A geographic information system library of over 100 spatial datasets and metadata links was assembled on the basis of the results of the needs assessment survey. Implementation options were presented, and the Geographic Information System Planning Committee offered recommendations for the management and distribution of spatial data belonging to Onondaga Lake Partnership members. The Onondaga Lake Partnership now has a strong foundation for building a comprehensive geographic information system for the Onondaga Lake watershed. The successful implementation of a geographic information system depends on the Onondaga Lake Partnership’s determination of: (1) the design and plan for a geographic information system, including the applications and spatial data that will be provided and to whom, (2) the level of geographic information system technology to be utilized and funded, and (3) the institutional issues of operation and maintenance of the system.
Biomass cogeneration: A business assessment
NASA Astrophysics Data System (ADS)
Skelton, J. C.
1981-11-01
The biomass cogeneration was reviewed. The business assessment is based in part on discussions with key officials from firms that have adopted biomass cogeneration systems and from organizations such as utilities, state and federal agencies, and banks directly involved in a biomass cogeneration project. The guide is organized into five chapters: biomass cogeneration systems, biomass cogeneration business considerations, biomass cogeneration economics, biomass cogeneration project planning, and case studies.
Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration. Division of Fish and Wildlife.
1988-11-01
The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less
Maya Quinones; William Gould; Carlos D. Rodriguez-Pedraza
2007-01-01
This report documents the type and source of geospatial data available for Haiti. It was compiled to serve as a resource for geographic information system (GIS)-based land management and planning. It will be useful for conservation planning, reforestation efforts, and agricultural extension projects. Our study indicates that there is a great deal of geospatial...
ERIC Educational Resources Information Center
DeVore, Paul W.
The background and objectives of the 1985-1986 Transportation Education Project of the Urban Mass Transportation Agency (UMTA) are discussed, along with project activities. The project was undertaken to transfer knowledge gained from federally-sponsored research and demonstrations to transit systems and to include the knowledge in college courses…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... the Federal government, in partnership with the State of Florida, to embark upon a multi-decade, multi... Spreader Canal Western Project. All of these CERP projects utilize lands that were acquired by the State... flows to the interior of the system will not cause adverse effects. The next step for implementation of...
Projecting national forest inventories for the 2000 RPA timber assessment.
John R. Mills; Xiaoping. Zhou
2003-01-01
National forest inventories were projected in a study that was part of the 2000 USDA Forest Service Resource Planning Act (RPA) timber assessment. This paper includes an overview of the status and structure of timber inventory of the National Forest System and presents 50-year projections under several scenarios. To examine a range of possible outcomes, results are...
Setting analyst: A practical harvest planning technique
Olivier R.M. Halleux; W. Dale Greene
2001-01-01
Setting Analyst is an ArcView extension that facilitates practical harvest planning for ground-based systems. By modeling the travel patterns of ground-based machines, it compares different harvesting settings based on projected average skidding distance, logging costs, and site disturbance levels. Setting Analyst uses information commonly available to consulting...
Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach
ERIC Educational Resources Information Center
Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.
2004-01-01
Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…
DOT National Transportation Integrated Search
2005-12-01
This volume provides an overview of the six studies that compose Phase II of the Enhanced Night Visibility project and the experimental plan for its third and final portion, Phase III. The Phase II studies evaluated up to 12 vision enhancement system...
23 CFR 450.212 - Transportation planning studies and project development.
Code of Federal Regulations, 2014 CFR
2014-04-01
... transportation operator(s) may undertake a multimodal, systems-level corridor or subarea planning study as part... part 771 and 40 CFR parts 1500-1508). Specifically, these corridor or subarea studies may result in... objective statement(s); (2) General travel corridor and/or general mode(s) definition (e.g., highway...
23 CFR 450.212 - Transportation planning studies and project development.
Code of Federal Regulations, 2012 CFR
2012-04-01
... transportation operator(s) may undertake a multimodal, systems-level corridor or subarea planning study as part... part 771 and 40 CFR parts 1500-1508). Specifically, these corridor or subarea studies may result in... objective statement(s); (2) General travel corridor and/or general mode(s) definition (e.g., highway...
23 CFR 450.212 - Transportation planning studies and project development.
Code of Federal Regulations, 2013 CFR
2013-04-01
... transportation operator(s) may undertake a multimodal, systems-level corridor or subarea planning study as part... part 771 and 40 CFR parts 1500-1508). Specifically, these corridor or subarea studies may result in... objective statement(s); (2) General travel corridor and/or general mode(s) definition (e.g., highway...
Projecting Program Cost Over an Adequate Time Horizon.
ERIC Educational Resources Information Center
Spencer, Milton
Planning Programming Budgeting Systems involve the introduction of three major operational concepts. First, the development of an analytical capability to examine in depth both agency objectives and the various programs to meet these objectives. Second, the formation of a five-year planning and programming process combined with a sophisticated…
Implementing a Systematic Planning Process in Two Very Small Rural Public Libraries.
ERIC Educational Resources Information Center
Senkevitch, Judith J.
1985-01-01
Describes a pilot project by a regional library system in central New York State to implement systematic planning activities in rural public libraries serving populations under 5,000. Motivations for the adoption of innovation and key elements in the decision making process during implementation are examined. (CLB)
DOT National Transportation Integrated Search
1996-12-01
THIS PROJECT IDENTIFIED TRAFFIC PARAMETERS AND THEIR REQUIRED ACCURACIES FOR CHARACTERIZING TRAFFIC FLOW IN CONVENTIONAL AND NEWER INTELLIGENT TRANSPORTATION SYSTEMS (ITS), OBTAINED STATE-OF-THE-ART DETECTORS AND INSTALLED AND EVALUATED THEM IN THREE...
Louisiana DOTD maintenance budget allocation system: final report.
DOT National Transportation Integrated Search
2002-11-01
This project developed a computer system to assist Louisiana Department of Transportation and Development (LA DOTD) maintenance managers in the preparation of zero-based, needs-driven annual budget plans for routine maintenance. This includes pavemen...
Data Citation & Acknowledgements
Atmospheric Science Data Center
2014-09-29
... under the NASA Applied Sciences Program within the Earth Science Division of the Science Mission Directorate. When POWER data products ... energy system design, system maintenance, project planning, policy making, etc.) or in a publication, we would appreciate receiving any ...
Bluetooth data collection system for planning and arterial management.
DOT National Transportation Integrated Search
2014-08-01
This report presents the results of a research and development project of an implementable portable wireless traffic data collection system. Utilizing Bluetooth wireless technology as a platform, portable battery powered data collection units housed ...
Projecting Labor Requirements for Transportation-Related Construction. Final Report.
ERIC Educational Resources Information Center
Washington Technical Inst., Washington, DC. Center for Urban Services.
This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…
The Autonomous Precision Landing and Hazard Detection and Avoidance Technology (ALHAT)
NASA Technical Reports Server (NTRS)
Epp, Chirold D.; Smith, Thomas B.
2007-01-01
As NASA plans to send humans back to the Moon and develop a lunar outpost, technologies must be developed to place humans and cargo safely, precisely, repeatedly, on the lunar surface with the capability to avoid surface hazards. Exploration Space Architecture Study requirements include the need for global lunar surface access with safe, precise landing without lighting constraints on terrain that may have landing hazards for human scale landing vehicles. Landing accuracies of perhaps 1,000 meters for sortie crew missions to 10 s of meters for Outpost class missions are required. The Autonomous precision Landing Hazard Avoidance Technology (ALHAT) project will develop the new and unique descent and landing Guidance, Navigation and Control (GNC) hardware and software technologies necessary for these capabilities. The ALHAT project will qualify a lunar descent and landing GNC system to a Technology Readiness Level (TRL) of 6 capable of supporting lunar crewed, cargo, and robotic missions. The (ALHAT) development project was chartered by NASA Headquarters in October 2006. The initial effort to write a project plan and define an ALHAT Team was followed by a fairly aggressive research and analysis effort to determine what technologies existed that could be developed and applied to the lunar landing problems indicated above. This paper describes the project development, research, analysis and concept evolution that has occurred since the assignment of the project. This includes the areas of systems engineering, GNC, sensors, sensor algorithms, simulations, fielding testing, laboratory testing, Hardware-In-The-Loop testing, system avionics and system certification concepts.